Powered by Deep Web Technologies
Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Guidance for implementing the long-term surveillance program for UMTRA Project Title I Disposal Sites  

SciTech Connect

This guidance document has two purposes: it provides guidance for writing site-specific long-term surveillance plans (LTSP) and it describes site surveillance, monitoring, and long-term care techniques for Title I disposal sites of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.). Long-term care includes monitoring, maintenance, and emergency measures needed to protect public health and safety and the environment after remedial action is completed. This document applies to the UMTRCA-designated Title I disposal sites. The requirements for long-term care of the Title I sites and the contents of the LTSPs are provided in U.S. Nuclear Regulatory Commission (NRC) regulations (10 CFR Section 40.27) provided in Attachment 1.

NONE

1996-02-01T23:59:59.000Z

2

National Ignition Facility Title II Design Plan  

Science Conference Proceedings (OSTI)

This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed.

Kumpan, S

1997-03-01T23:59:59.000Z

3

G Subject: Implementation of Division F, Title I, Title II, and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I, Title II, and Title III, and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113- References: Consolidated and Further Continuing...

4

Major Design Changes Late in Title II or early in Title III Can Be Costly  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Design Changes Late in Title II or Design Changes Late in Title II or early in Title III Can Be Costly PMLL Identifier: PMLL-2006-Y12-HEUMF-0001 (Source: User Submitted) Validator: Victoria Pratt Date: 4/24/2010 Contact: 202-586-7358 Statement: Expect increased costs as well as omissions and errors if significant design changes occur late in Title II or early in Title III Discussion: Numerous changes in design requirements late in Title II and early in Title III resulted in significant concurrency in the design-and-build process, making it difficult to avoid major schedule delays and meet commitments. Late in Title II, changes for the foundation and active confinement ventilation system resulted in areas of design immaturity, which led to further design changes and refinements in Title III. This necessitated major structural changes to address

5

News Release: 2010 UMTRCA Title I and Title II Disposal Sites Reports  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2010 UMTRCA Title I and Title II Disposal Sites 2010 UMTRCA Title I and Title II Disposal Sites Reports Available News Release: 2010 UMTRCA Title I and Title II Disposal Sites Reports Available February 23, 2011 - 9:51am Addthis News Contact: DOE, Rich Bush, UMTRCA Program Lead (970) 248-6073 Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs (720) 377-9672 Grand Junction, Colo. - The U.S. Department of Energy announces the availability of the 2010 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites and the 2010 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites reports. In 2010, DOE's Office of Legacy Management was responsible for providing long-term surveillance and maintenance services at 25 uranium mill tailings

6

Microsoft Word - S05096_Title II Transition Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process for Transition of Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance March 2012 LMS/S05096 This page intentionally left blank LMS/S05096 Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance March 2012 This page intentionally left blank U.S. Department of Energy Process for Transition of UMTRCA Title II Disposal Sites to LM for LTSM March 2012 Doc. No. S05096 Page i Contents Abbreviations ................................................................................................................................. iii

7

Uranium Mill Tailings Remedial Action (UMTRA) Project. [UMTRA project  

SciTech Connect

The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, hereinafter referred to as the Act.'' Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial action at designated inactive uranium processing sites (Attachment 1 and 2) and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing site. The purpose of the remedial actions is to stabilize and control such uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner to minimize radiation health hazards to the public. The principal health hazards and environmental concerns are: the inhalation of air particulates contaminated as a result of the emanation of radon from the tailings piles and the subsequent decay of radon daughters; and the contamination of surface and groundwaters with radionuclides or other chemically toxic materials. This UMTRA Project Plan identifies the mission and objectives of the project, outlines the technical and managerial approach for achieving them, and summarizes the performance, cost, and schedule baselines which have been established to guide operational activity. Estimated cost increases by 15 percent, or if the schedule slips by six months. 4 refs.

Not Available

1989-09-01T23:59:59.000Z

8

Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 1: Title II design report  

SciTech Connect

The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 1 provides a comprehensive narrative description of the proposed facility and systems, the basis for each of the systems design, and the engineering assessments that were performed to support the technical basis of the Title II design. The intent of the system description presented is to provide WHC an understanding of the facilities and equipment provided and the A/E`s perspective on how these systems will operate.

NONE

1995-09-01T23:59:59.000Z

9

Title  

U.S. Energy Information Administration (EIA) Indexed Site

Name Title Date Cap and Trade: the Lieberman-Warner Climate Security Act of 2007 John Steelman April 2011 The Future of Onshore Oil & Gas Production 1 Largest New Source: Existing...

10

Policy Flash 2013-53 Implementation of Division F, Title I, II...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Implementation of Division F, Title I, II, III AL 2013-06 and FAL 2013-04 Policy Flash 2013-53 Implementation of Division F, Title I, II, III AL 2013-06 and FAL 2013-04 Questions...

11

TITLE  

Office of Legacy Management (LM)

1 111II1111111111111111111111111 1 111II1111111111111111111111111 GSB WW06 Floodplains and Wetlands Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico December 1993 y :

12

TITLE  

Office of Legacy Management (LM)

68 68 OFF C . 2 Sensitive Species Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico December 1993 . I \ . j Environmental Restoration Sensitive Species Su wey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico December 1 993 Environmental Restoration 1 Sensitive Species Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico Prepared for: U.S. Deparunenr of Energy Environmental Restoration Division DOE Nevada Operations Officc Las Vegas, Nevada 89193-851 8 Prepared by: I T CORPORATION 4330 S. Valley View Blvd.. Suite 114 Las Vegas, Nevada 89 103 Work Pcrformcd undcr Contract No. DE-AC08-92NV10972 Table of Contents List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii ... List of Tables . . . . . . . . . . .

13

TITLE  

Office of Legacy Management (LM)

OFF C OFF C . 1 Ili II11IlIIllllllllllllllI1111I~I B M - 171- 147 ~ ~ ~ 0 3 3 1 0 8 Biology and M e d i c i n e AMCHITKA BIOENVIRONMENTAL PROGRAM BIOENVIRONMENTAL S A F E T Y STUDIES, AMC HITKA ISLAND, ALASKA CANNIKIN D t 2 MONTHS REPORT Compiled by James B . K i r k w o o d and R. G l e n Fuller J u n e , 1972 P r e p a r e d for the U . S. A t o m i c E n e r g y C o m m i s s i o n under C o n t r a c t N o . AT(2b- 1 ) - 17 1 - - BATTELLE Columbus Labor a t o r ies 5 05 King Avenue C o l u m b u s , Ohio 4 3 2 0 1 P r i n t e d i n the United S t a t e s of America. A v a i l a b l e from N a t i o n a l Technical Information S e r v i c e U.S. Department of Commerce S p r i n g f i e l d , V i r g i n i a 22151 This r e p o r t was prepared a s a n account o f work sponsored by t h e United S t a t e s Government. Neither t h e United S t a t e s . - nor t h e United S t a t e s Atomic Energy Carrmission, nor any of

14

TITLE  

Office of Legacy Management (LM)

M M A U h G E D 0 1 M M l N Y A R I E I ENERGY SYSTEMS. IYC. FOR THE U.S. O E P A R I M E I I T OF ENEnOY June 14, 1994 POST OFFICE BOX 2006 OAK RIDGE. TENNESSEE 37831 Dr. W. A. Williams EM-421 Trevion II Building Department of Energy Washington, D. C. 20585 Dear Dr. Williams: T r i p Report: Radiological Survey of Former Associate Aircraft Tool and Manufacturing Company Site, Fairfield, Ohio (FOHOOl), M a y 31 and June 1,1994 On May 31 and June I, a radiological survey was conducted in the area surveyed during the March 7, 1994 survey in the referenced facility. This letter provides the results of that survey. Survey methods consisted of a beta-gamma survey of the surface of the concrete as the floor covering material was being removed by a construction contractor to begin renovation of the former

15

UMTRA Ground Water Project management action process document  

Science Conference Proceedings (OSTI)

A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards.

NONE

1996-03-01T23:59:59.000Z

16

UMTRA Project: Environment, Safety, and Health Plan  

SciTech Connect

The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project`s ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors` evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations.

Not Available

1995-02-01T23:59:59.000Z

17

Policy Flash 2013-53 Implementation of Division F, Title I, II, III AL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Flash 2013-53 Implementation of Division F, Title I, II, III Flash 2013-53 Implementation of Division F, Title I, II, III AL 2013-06 and FAL 2013-04 Policy Flash 2013-53 Implementation of Division F, Title I, II, III AL 2013-06 and FAL 2013-04 Questions concerning conference spending, should be directed to Jason Taylor at 202-287-1560 or jason.taylor@hq.doe.gov For DOE question concerning the policy flash should be directed to Barbara Binney at 202-287-1340 or barbara.binney@hq.doe.gov for the AL or Richard Bonnell at 202-287-1747 or at richard.bonnell@hq.doe.gov for the FAL. For NNSA questions concerning the policy flash should be directed NNSA by contacting 202-586-6681 Policy Flash 2013-53 FY 2013 appropriations.pdf AL 2013-06 FY 2013 appro.pdf FAL 2013 - 04 FY13 Approp.pdf More Documents & Publications Policy Flash 2014-05 Continuing Appropriations Act, 2014 -- Implementation

18

Policy Flash 2013-53 Implementation of Division F, Title I, II, III AL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Flash 2013-53 Implementation of Division F, Title I, II, III Policy Flash 2013-53 Implementation of Division F, Title I, II, III AL 2013-06 and FAL 2013-04 Policy Flash 2013-53 Implementation of Division F, Title I, II, III AL 2013-06 and FAL 2013-04 Questions concerning conference spending, should be directed to Jason Taylor at 202-287-1560 or jason.taylor@hq.doe.gov For DOE question concerning the policy flash should be directed to Barbara Binney at 202-287-1340 or barbara.binney@hq.doe.gov for the AL or Richard Bonnell at 202-287-1747 or at richard.bonnell@hq.doe.gov for the FAL. For NNSA questions concerning the policy flash should be directed NNSA by contacting 202-586-6681 Policy Flash 2013-53 FY 2013 appropriations.pdf AL 2013-06 FY 2013 appro.pdf FAL 2013 - 04 FY13 Approp.pdf More Documents & Publications

19

Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications  

SciTech Connect

The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 3 is a compilation of the construction specifications that will constitute the Title II materials and performance specifications. This volume contains CSI specifications for non-equipment related construction material type items, performance type items, and facility mechanical equipment items. Data sheets are provided, as necessary, which specify the equipment overall design parameters.

NONE

1995-09-01T23:59:59.000Z

20

Computer code input for thermal hydraulic analysis of Multi-Function Waste Tank Facility Title II design  

Science Conference Proceedings (OSTI)

The input files to the P/Thermal computer code are documented for the thermal hydraulic analysis of the Multi-Function Waste Tank Facility Title II design analysis.

Cramer, E.R.

1994-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

DOE/EA-1312: Environmental Assessment of Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) (September 1999)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Rev. 0 Environmental Assessment of Ground Water Compliance at the Grand Junction UMTRA Project Site (Climax Uranium Millsite) Final September 1999 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy EA of Ground Water Compliance at the Grand Junction UMTRA Project Site DOE Grand Junction Office Page ii Final September 1999 Contents Executive Summary.........................................................................................................................v 1.0 Introduction...............................................................................................................................1 1.1 Grand Junction UMTRA Project Site Location and Description.........................................1

22

UMTRA project list of reportable occurrences  

Science Conference Proceedings (OSTI)

This UMTRA Project List of Reportable occurrences is provided to facilitate efficient categorization of reportable occurrences. These guidelines have been established in compliance with DOE minimum reporting requirements under DOE Order 5000.3B. Occurrences are arranged into nine groups relating to US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project operations for active sites. These nine groupings are provided for reference to determined whether an occurrence meets reporting requirement criteria in accordance with the minimum reporting requirements. Event groups and significance categories that cannot or will not occur, and that do not apply to UMTRA Project operations, are omitted. Occurrence categorization shall be as follows: Group 1. Facility Condition; Group 2. Environmental; Group 3. Personnel Safety; Group 4. Personnel Radiation Protection; Group 5. Safeguards and Security; Group 6. Transportation; Group 7. Value Basis Reporting; Group 8. Facility Status; and Group 9. Cross-Category Items.

Not Available

1994-04-01T23:59:59.000Z

23

Special study on vegetative covers. [UMTRA Project  

SciTech Connect

This report describes the findings of a special study on the use of vegetative covers to stabilize tailings piles for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The principal rationale for using plants would be to establish a dynamic system for controlling water balance. Specifically, vegetation would be used to intercept and transpire precipitation to the atmosphere, rather than allowing water to drain into the tailings and mobilize contaminants. This would facilitate compliance with groundwater standards proposed for the UMTRA Project by the Environmental Protection Agency. The goals of the study were to evaluate the feasibility of using vegetative covers on UMTRA Project piles, define the advantages and disadvantages of vegetative covers, and develop general guidelines for their use when such use seems reasonable. The principal method for the study was to analyze and apply to the UMTRA Project the results of research programs on vegetative covers at other US Department of Energy (DOE) waste management facilities. The study also relied upon observations made of existing stabilized piles at UMTRA Project sites where natural vegetation is growing on the rock-covered surfaces. Water balance and erosion models were also used to quantify the long-term performance of vegetative covers planned for the topslopes of stabilized piles at Grand Junction and Durango, Colorado, two UMTRA Project sites where the decision was made during the course of this special study to use vegetative covers. Elements in the design and construction of the vegetative covers at these two sites are discussed in the report, with explanations of the differing features that reflect differing environmental conditions. 28 refs., 18 figs., 9 tabs.

Not Available

1988-11-01T23:59:59.000Z

24

Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 4: Project cost estimate  

SciTech Connect

The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. This volume represents the total estimated costs for the W113 facility. Operating Contractor Management costs have been incorporated as received from WHC. The W113 Facility TEC is $19.7 million. This includes an overall project contingency of 14.4% and escalation of 17.4%. A January 2001 construction contract procurement start date is assumed.

NONE

1995-09-01T23:59:59.000Z

25

Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annual Site Inspection and Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites November 2012 LMS/S09415 ENERGY Legacy Management U.S. DEPARTMENT OF Sherwood, Washington, Disposal Site, 2012 Sherwood, Washington, Disposal Site, 2012 L-Bar, New Mexico, Disposal Site, 2012 L-Bar, New Mexico, Disposal Site, 2012 Bluewater, New Mexico, Disposal Site, 2012 Bluewater, New Mexico, Disposal Site, 2012 Maybell West, Colorado, Disposal Site, 2012 Maybell West, Colorado, Disposal Site, 2012 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy,

26

UMTRA Surface Project management action process document. Final report: Revision 1  

Science Conference Proceedings (OSTI)

A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project.

NONE

1996-04-01T23:59:59.000Z

27

UMTRA Surface Project management action process document: Final. Revision 2  

Science Conference Proceedings (OSTI)

Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

NONE

1996-06-01T23:59:59.000Z

28

Multi-Function Waste Tank Facility thermal hydraulic analysis for Title II design  

Science Conference Proceedings (OSTI)

The purpose of this work was to provide the thermal hydraulic analysis for the Multi-Function Waste Tank Facility (MWTF) Title II design. Temperature distributions throughout the tank structure were calculated for subsequent use in the structural analysis and in the safety evaluation. Calculated temperatures of critical areas were compared to design allowables. Expected operating parameters were calculated for use in the ventilation system design and in the environmental impact documentation. The design requirements were obtained from the MWTF Functional Design Criteria (FDC). The most restrictive temperature limit given in the FDC is the 200 limit for the haunch and dome steel and concrete. The temperature limit for the rest of the primary and secondary tanks and concrete base mat and supporting pad is 250 F. Also, the waste should not be allowed to boil. The tank geometry was taken from ICF Kaiser Engineers Hanford drawing ES-W236A-Z1, Revision 1, included here in Appendix B. Heat removal rates by evaporation from the waste surface were obtained from experimental data. It is concluded that the MWTF tank cooling system will meet the design temperature limits for the design heat load of 700,000 Btu/h, even if cooling flow is lost to the annulus region, and temperatures change very slowly during transients due to the high heat capacity of the tank structure and the waste. Accordingly, transients will not be a significant operational problem from the viewpoint of meeting the specified temperature limits.

Cramer, E.R.

1994-11-10T23:59:59.000Z

29

Long-Term Surveillance Plan for the Sherwood Project (UMTRCA Title II) Reclamation Cell, Wellpinit, Washington, February 2001  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Program and Maintenance Program Long-Term Surveillance Plan for the DOE Sherwood Project (UMTRCA Title II) Reclamation Cell Wellpinit, Washington February 2001 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC 01-06 Document Number S00204 DOE/Grand Junction Office Sherwood LTSP February 2001 Page iii Contents 1.0 Introduction............................................................................................................... 1-1 1.1 Purpose ..................................................................................................................... 1-1 1.2 Legal and Regulatory Requirements ........................................................................

30

Help - Titles  

NLE Websites -- All DOE Office Websites (Extended Search)

data in the bibliographic records for all holdings of the 10 ANL Libraries. A title query will search the fields shown below. Title Alternate Title Publisher's Serial Title...

31

DOE - Office of Legacy Management -- Conoco Conquista Site -...  

Office of Legacy Management (LM)

This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Texas. UMTRA Title II sites are privately owned and operated sites that were active when the...

32

Final Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Impact Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Sites AGENCY: U.S. DEP.4RTMENT OF ENERGY ACTIOK: FL&-DING OF NO SIGNIFICANT IMP-ACT (FONSI) SU$IM$RY: The U.S. Department of Energy (DOE) plans to implement ground lvater compliance strategies for two Uranium Mill Tailings Remedial Action (UMTR.4) Project sites near Slick Rock. Colorado. The purpose of the strategies is to comply with U.S. En\.ironmental Protection .Qency (EP.Aj ground n'ater standards defined in Title 40 Codr ~fF~d~w/ iieplutio?r.s (CFR) Part 192. and in so doing. protect human health and the en\.ironment. Ground water at the Slick Rock sites is contaminated with residual radioactive materials from hisTorica acti\,ities, associated with the processin of uranium ore, The planned action (~formeri>,.

33

Procedures for preparation, printing, and distribution of UMTRA Project National Environmental Policy Act documents  

SciTech Connect

This paper discusses the procedures for preparation, printing and distribution of Uranium Mill Tailings Remedial Action (UMTRA) Project National Environmental Policy Act documents. (KJD)

Not Available

1988-08-01T23:59:59.000Z

34

UMTRA project disposal cell cover biointrusion sensitivity assessment, Revision 1  

SciTech Connect

This study provides an analysis of potential changes that may take place in a Uranium Mill Tailings Remedial Action (UMTRA) Project disposal cell cover system as a result of plant biointrusion. Potential changes are evaluated by performing a sensitivity analysis of the relative impact of root penetrations on radon flux out of the cell cover and/or water infiltration into the cell cover. Data used in this analysis consist of existing information on vegetation growth on selected cell cover systems and information available from published studies and/or other available project research. Consistent with the scope of this paper, no new site-specific data were collected from UMTRA Project sites. Further, this paper does not focus on the issue of plant transport of radon gas or other contaminants out of the disposal cell cover though it is acknowledged that such transport has the potential to be a significant pathway for contaminants to reach the environment during portions of the design life of a disposal cell where plant growth occurs. Rather, this study was performed to evaluate the effects of physical penetration and soil drying caused by plant roots that have and are expected to continue to grow in UMTRA Project disposal cell covers. An understanding of the biological and related physical processes that take place within the cover systems of the UMTRA Project disposal cells helps the U.S. Department of Energy (DOE) determine if the presence of a plant community on these cells is detrimental, beneficial, or of mixed value in terms of the cover system`s designed function. Results of this investigation provide information relevant to the formulation of a vegetation control policy.

NONE

1995-10-01T23:59:59.000Z

35

Moisture content and unsaturated conditions in UMTRA project radon barriers  

SciTech Connect

A typical Uranium Mill Tailings Remedial Action (UMTRA) Project disposal facility consists of uranium tailings and other contaminated materials covered by a three to six foot thick radon barrier and six inches of filter sand, overlain by one foot of erosion-protection riprap. To comply with the proposed US Environmental Protection Agency groundwater protection standards applicable to the UMTRA Project, groundwater concentration limits of hazardous constitutents cannot be exceeded at the point of compliance, which is the downgradient limit of the waste management area. The typical radon barrier has a saturated hydraulic conductivity of approximately 1 {times} 10{sup {minus}7} centimeters per second (cm/s). Long-term seepage rates from a disposal facility with an unsaturated radon barrier may permit the concentration limits to be met at the point of compliance. Field studies were undertaken to measure the percent saturation and the relation of percent saturation to soil tension, and to predict the hydraulic conductivity as a function of percent saturation in radon barriers at three UMTRA Project disposal facilities that have been completed for up to two years. Presently typical covers have been completed at the Shiprock, Clive, and Burrell sites, and they are planned or under construction at the Ambrosia Lake, Green River, Lakeview, Mexican Hat, Slick Rock, and Tuba City sites. 2 refs., 13 figs., 1 tab.

Not Available

1988-12-01T23:59:59.000Z

36

UMTRA water sampling and analysis plan, Lakeview, Oregon  

Science Conference Proceedings (OSTI)

The purpose of this document is to provide background, guidance, and justification for water sampling activities for the Lakeview, Oregon, Uranium Mill Tailings Remedial Action (UMTRA) processing and disposal sites. This water sampling and analysis plan will form the basis for groundwater sampling and analysis work orders (WSAWO) to be implemented during 1993. Monitoring at the former Lakeview processing site is for characterization purposes and in preparation for the risk assessment, scheduled for the fall of 1993. Compliance monitoring was conducted at the disposal site. Details of the sampling plan are discussed in Section 5.0.

Not Available

1993-09-29T23:59:59.000Z

37

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

plastic-like products. A similar material can also be made from lignin produced in biorefineries. The paper, titled "Turning renewable resources into value-added polymer:...

38

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Confinement Ventilation Systems) with the following titles: 1) BC Off-Gas Exhaust Standby Fan Autostart, 2) E-Wing Supply and Exhaust Interlocks, 3) BC Tertiary Exhaust...

39

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ventilation Systems) with the following titles: 1) BC Off-Gas Exhaust Standby Fan Autostart, 2) E-Wing Supply and Exhaust Interlocks, 3) BC Tertiary Exhaust Interlocks...

40

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

research thesis titled "Linking Supercomputing and Systems Biology for Efficient Bioethanol Production." The students -- Scott Horton, Scott Molony and Steven Arcangeli -- were...

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

unknown title  

E-Print Network (OSTI)

.. 1205 banner hill road " erwin, tn 37650 iII phone 423.743.9141 aII www.nudearfuelservkescom www.nudearluelservices.com

Mr. Luis; A. Reyes; Regional Administrator

2010-01-01T23:59:59.000Z

42

Supplement to the UMTRA Project water sampling and analysis plan, Ambrosia Lake, New Mexico  

SciTech Connect

The Ambrosia Lake Uranium Mill Tailings Remedial Action (UMTRA) Project site is in McKinley County, New Mexico. As part of UMTRA surface remediation, residual radioactive materials were consolidated on the site in a disposal cell that was completed July 1995. The need for ground water monitoring was evaluated and found not to be necessary beyond the completion of the remedial action because the ground water in the uppermost aquifer is classified as limited use.

NONE

1995-08-01T23:59:59.000Z

43

TITLE BLOCK  

Science Conference Proceedings (OSTI)

SAMPLING AND ANALYSIS OF COMMERCIAL FATS AND OILS METHOD NUMBER: Joint AOCS/JOCS Official Method Cd 28-10 APPROVAL: Official Method with full collaborative data TITLE: Glycidyl Fatty Acid Esters in Edible Oils DEFINITION: This meth

44

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

II. ISLSCP II Total Plant-Available Soil Water Storage Capacity of the Rooting Zone. Data set prepared A. Kleidon. For this data set, the geographic distribution of the total...

45

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

II. ISLSCP II Global River Fluxes of Carbon and Sediments to the Oceans . This data set was prepared by W. Ludwig, P. Amiotte-Suchet, and J.L. Probst and represents...

46

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Socioeconomic Data Sets from the ISLSCP Initiative II Data Collection Released The ORNL DAAC announces the release of two data sets within the socioeconomics category of the...

47

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

ISLSCP II Global Precipitation Climatology Project Version 1, Pentad Precipitation. Data set prepared P. Xie. This data set includes global precipitation rates for 5-day, or...

48

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Their Climate End Station II will have a direct influence on national science policy by refining climate models and helping predict future climates based on varying energy policy...

49

unknown title  

E-Print Network (OSTI)

Developing and running Tcl scripts to control the Altera Quartus II software allows you to perform a wide range of functions, such as compiling a design or writing procedures to automate common tasks. You can use Tcl scripts to manage a Quartus II project, make assignments, define

Tcl Scripting

2010-01-01T23:59:59.000Z

50

unknown title  

E-Print Network (OSTI)

Developing and running Tcl scripts to control the Altera Quartus II software allows you to perform a wide range of functions, such as compiling a design or writing procedures to automate common tasks. You can use Tcl scripts to manage a Quartus II project, make assignments, define

Tcl Scripting

2012-01-01T23:59:59.000Z

51

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

52

Project title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

53

TITLE PAGE  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: Seismic and Rockphysics Diagnostics of Title: Seismic and Rockphysics Diagnostics of Multiscale Reservoir Textures Type of Report: Final Technical Reporting Start Date: April 1, 2005 Reporting End Date: June 30, 2005 Principal Investigator: Prof. Gary Mavko Date of Report: July 2005 DOE Award Number: DE-FC26-01BC15354 Submitting Organization: Stanford University, 651 Serra Street, Suite 260, Stanford, CA 94305-4125 1 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warrantee, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not

54

UMTRA project water sampling and analysis plan, Naturita, Colorado  

SciTech Connect

Surface remedial action is scheduled to begin at the Naturita UMTRA Project processing site in the spring of 1994. No water sampling was performed during 1993 at either the Naturita processing site (NAT-01) or the Dry Flats disposal site (NAT-12). Results of previous water sampling at the Naturita processing site indicate that ground water in the alluvium is contaminated as a result of uranium processing activities. Baseline ground water conditions have been established in the uppermost aquifer at the Dry Flats disposal site. Water sampling activities scheduled for April 1994 include preconstruction sampling of selected monitor wells at the processing site, surface water sampling of the San Miguel River, sampling of several springs/seeps in the vicinity of the disposal site, and sampling of two monitor wells in Coke Oven Valley. The monitor well locations provide sampling points to characterize ground water quality and flow conditions in the vicinity of the sites. The list of analytes has been updated to reflect constituents related to uranium processing activities and the parameters needed for geochemical evaluation. Water sampling will be conducted annually at minimum during the period of construction activities.

Not Available

1994-04-01T23:59:59.000Z

55

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Direct push technology (DPT) borings and a monitoring well will be drilled to collect soil and groundwater samples from the M-Area Chemical Oxidation (MACO) II injection site....

56

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

from the ISLSCP Initiative II Snow, Sea Ice, and Oceans Data Collection Released The ORNL DAAC announces the release of three data sets within the Snow, Sea Ice, and Oceans...

57

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

For Users NSLS User Access Industrial User Program Policies and Procedures Data Management Policy Services PASS System Check InOut Form End of Run Survey Deadlines InSynC NSLS-II...

58

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Search for Ultra High-Energy Neutrinos with AMANDA-II Lisa Gerhardt UC Irvine Abstract: Many astrophysical models predict a diffuse flux of ultra high-energy neutrinos from active...

59

CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE CLEANING UP MILL TAILINGS AND GROUND WATER AT THE MOAB UMTRA PROJECT SITE August 2, 2010 - 12:00pm Addthis A sheep’s foot roller compacts the tailings in the disposal cell. A sheep's foot roller compacts the tailings in the disposal cell. Moab, UT MILL TAILINGS REMOVAL Sixteen million tons of uranium mill tailings 80 feet high stood on the banks of the Colorado River near Moab in southeast Utah, as a legacy to the former ore-processing site that operated for nearly three decades beginning in the mid-1950s. That is until April 2009, when the U.S. Department of Energy began moving the tailings by rail to an engineered disposal cell constructed 30 miles north near Crescent Junction, Utah. The mill tailings,

60

UMTRA project water sampling and analysis plan, Naturita, Colorado. Revision 1  

SciTech Connect

Planned, routine ground water sampling activities for calendar year 1995 to 1997 at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Naturita, Colorado, are described in this water sampling and analysis plan. The following plan identifies and justifies the sampling locations, analytical parameters, detection limits, sampling frequency, and specific rationale for each routine monitoring station at the site. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.

NONE

1995-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

THE TITLE  

E-Print Network (OSTI)

Permission is herewith granted to Dalhousie University to circulate and to have copied for non-commercial purposes, at its discretion, the above title upon the request of individuals or institutions. I understand that my thesis will be electronically available to the public. The author reserves other publication rights, and neither the thesis nor extensive extracts from it may be printed or otherwise reproduced without the authors written permission. The author attests that permission has been obtained for the use of any copyrighted material appearing in the thesis (other than brief excerpts requiring only proper acknowledgement in scholarly writing), and that all such use is clearly acknowledged.

Noah Body; D. Odaprof; A. External

2006-01-01T23:59:59.000Z

62

THE TITLE  

E-Print Network (OSTI)

Permission is herewith granted to Dalhousie University to circulate and to have copied for non-commercial purposes, at its discretion, the above title upon the request of individuals or institutions. I understand that my thesis will be electronically available to the public. The author reserves other publication rights, and neither the thesis nor extensive extracts from it may be printed or otherwise reproduced without the authors written permission. The author attests that permission has been obtained for the use of any copyrighted material appearing in the thesis (other than brief excerpts requiring only proper acknowledgement in scholarly writing), and that all such use is clearly acknowledged. Signature of Author

Noah Body; D. Odaprof; A. External

2010-01-01T23:59:59.000Z

63

THE TITLE  

E-Print Network (OSTI)

DEGREE: M.C.Sc. CONVOCATION: May YEAR: 2011 Permission is herewith granted to Dalhousie University to circulate and to have copied for non-commercial purposes, at its discretion, the above title upon the request of individuals or institutions. The author reserves other publication rights, and neither the thesis nor extensive extracts from it may be printed or otherwise reproduced without the authors written permission. The author attests that permission has been obtained for the use of any copyrighted material appearing in the thesis (other than brief excerpts requiring only proper acknowledgement in scholarly writing) and that all such use is clearly acknowledged.

Noah Body; D. Prof; D. Odaprof; A. External

2010-01-01T23:59:59.000Z

64

Uranium Mill Tailings Remedial Action (UMTRA) Surface Project: Project plan. Revision 1  

Science Conference Proceedings (OSTI)

The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) [Public Law (PL) 95-604, 42 United States Code (USC) 7901], hereinafter referred to as the ``Act,`` authorizes the US Department of Energy (DOE) to stabilize and control surface tailings and ground water contamination. To fulfill this mission, the DOE has established two projects under the Uranium Mill Tailings Remedial Action (UMTRA) Project Office. The Ground Water Project was established in April 1991 as a major project and a separate project plan will be prepared for that portion of the mission. This project plan covers the UMTRA Surface Project, a major system acquisition (MSA).

Not Available

1993-08-11T23:59:59.000Z

65

Presentation Title  

NLE Websites -- All DOE Office Websites (Extended Search)

: FE0008868 Program Manager: Dr. Richard Dunst : FE0008868 Program Manager: Dr. Richard Dunst Novel Functional Graded Thermal Barrier Coatings in Coal-fired Power Plant Turbines Jing Zhang Department of Mechanical Engineering Indiana University-Purdue University Indianapolis UCR, HBCU/OMI Contractors Review Meeting Pittsburgh, PA June 11-13, 2013 2 Acknowledgement * Subcontractor (Praxair Surface Technologies): James Knapp * Industrial collaborators (Praxair Surface Technologies): John K. Anderson, Vlad Belov, Don Lemen, Li Li * Graduate students (IUPUI): Xingye Guo, Yi Zhang 3 Outline of Talk * I. Introduction i. Pyrochlore oxide ii. Double-layer thermal barrier coating * II. Results (September 1, 2012- June 1,2013) i. Powder fabrication and characterizations ii. Design of double-layer structure

66

PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Baltimore Baltimore PROJECT TITLE: EECBG - GHG Scrubbing System Page 1 of2 STATE: MD Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-EE0000738 GFO-0000738-002 0 Based all my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: All Technical advice and planning assistance to international, national, state, and local organizations. 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

67

THE TITLE  

E-Print Network (OSTI)

DEGREE: M.C.Sc. CONVOCATION: May YEAR: 2007 Permission is herewith granted to Dalhousie University to circulate and to have copied for non-commercial purposes, at its discretion, the above title upon the request of individuals or institutions. Signature of Author The author reserves other publication rights, and neither the thesis nor extensive extracts from it may be printed or otherwise reproduced without the authors written permission. The author attests that permission has been obtained for the use of any copyrighted material appearing in the thesis (other than brief excerpts requiring only proper acknowledgement in scholarly writing) and that all such use is clearly acknowledged. iii Table of Contents Abstract......................................

Noah Body; D. Prof; D. Odaprof; A. External

2006-01-01T23:59:59.000Z

68

THE TITLE  

E-Print Network (OSTI)

DEGREE: M.C.Sc. CONVOCATION: May YEAR: 2007 Permission is herewith granted to Dalhousie University to circulate and to have copied for non-commercial purposes, at its discretion, the above title upon the request of individuals or institutions. Signature of Author The author reserves other publication rights, and neither the thesis nor extensive extracts from it may be printed or otherwise reproduced without the authors written permission. The author attests that permission has been obtained for the use of any copyrighted material appearing in the thesis (other than brief excerpts requiring only proper acknowledgement in scholarly writing) and that all such use is clearly acknowledged. iii Table of Contents List of Tables................................... Abstract......................................

Noah Body; D. Prof; D. Odaprof; A. External

2006-01-01T23:59:59.000Z

69

PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Richmond Richmond PROJECT TITLE: EECBG - Solar Compactors and Recycling Units Page 1 of2 STATE: VA Funding Opportunity Announcement Number DE-FOA-0000013 Procurement Instrument Number DE-EE0000878 NEPA Control Number cm Number GFO-0000878-003 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

70

UMTRA Project Site Observational Work Plan, Mexican Hat, Utah  

SciTech Connect

Surface cleanup activities at the Mexican Hat UMTRA processing site are nearing completion. Ground Water contamination at the Mexican Hat site is a result of uranium milling operations. The extent of residual process water has been identified, and it is limited to the uppermost aquifer in the vicinity of the site. Deeper aquifers are not affected because of an upward hydraulic gradient and the presence of a confining unit (the deeper aquifers are protected by hydrogeologic isolation). The uppermost unit is returning to its pre-milling, mainly unsaturated state. The unit that contains the contaminated water is not a ground water resource because it qualifies as Class III (limited use) based on limited yield. Ground water in the uppermost unit is currently not used and is not anticipated to be used as a ground water resource. The nearby San Juan River and a converted oil exploration well provide all of the water needs for the area. There are no current threats to human health or livestock; and, because the zone of contamination does not represent a ground water resource, none are anticipated in the future. There are, however, seeps where contaminated water is exposed at land surface. The seeps create potential exposure pathways for plants and wildlife. It is not known at this time if there is a risk to the environment. Additional investigations are needed and are described in this document to confirm the presence or absence of potential environmental risks. Additional hydrogeologic investigations are not required. The proposed ground water compliance strategy for the site is no remediation, because the ground water in the uppermost aquifer (which is also the zone of contamination) qualifies for supplemental standards based on Class III, limited yield, and because there are no threats to human health. Domestic and agricultural water is pumped from a deeper aquifer that is isolated from the contaminated zone.

Not Available

1994-09-01T23:59:59.000Z

71

Help - Title Search  

NLE Websites -- All DOE Office Websites (Extended Search)

Data Fields - Title (Adavanced Search) The title field contains the words in the publication title. The system will search for the words (either singular or plurals) within the...

72

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

73

PRESENTATION TITLE  

NLE Websites -- All DOE Office Websites (Extended Search)

PORTLAND DISTRICT PORTLAND DISTRICT 1 Corps of Engineers Hydro Optimization in the Pacific Northwest Presentation for: Southwestern Federal Hydropower Conference Kansas City, Missouri 16 June 2011 By Charlie Allen Hydroelectric Design Center US Army Corps of Engineers BUILDING STRONG ® PORTLAND DISTRICT 2 PRESENTATION OUTLINE  HOT INTRODUCTION AND HISTORY  TYPE I (Unit) OPTIMIZATION ► Cam Curve Verification ► 3-D Cam Controllers ► Inputs and Telemetry ► Gate-Blade Optimizer  TYPE II (Powerhouse) OPTIMIZATION ► Economic Dispatch ► Unit Commitment ► Absolute Flow Measurement ► Benefits Summary  QUESTIONS BUILDING STRONG ® PORTLAND DISTRICT 3 Hydropower Optimization Team (HOT) HOT is joint effort between BPA, COE, and BOR to maximize use of available water for hydropower

74

unknown title  

E-Print Network (OSTI)

In Nuclear Physics numerous possibilities exist to investigate fundamental symmetries and interactions. In particular, the precise measurements of properties of fundamental fermions, searches for new interactions in ?-decays, and violations of discrete symmeties offer possibilities to search for physics beyond Standard Theory. Precise measurements of fundamental constants can be carried out. Low energy experiments allow to probe New Physics at mass scales far beyond the reach of present accelerators or such planned for the future and at which predicted new particles could be produced directly. 1. Fundamental Forces and Symmetries Symmetries play an important and crucial role in physics. Global symmetries give rise to conservation laws and local symmetries yield forces [ 1]. To date we know four fundamental interactions: (i) Electromagnetism, (ii) Weak Interactions, (iii) Strong Interactions, and (iv) Gravitation. These four forces are fundamental in the sense that all observed dynamical processes in physics can be traced back to one or a combination of them. Together with fundamental symmetries they from a framework on which all physical descriptions ultimately rest.

Klaus P. Jungmann A; Kernfysisch Versneller Instituut

2005-01-01T23:59:59.000Z

75

Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site  

Office of Legacy Management (LM)

GJO-2000-177-TAR GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site December 2001 Work Performed Under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy Approved for public release; distribution is unlimited. GJO-2000-177-TAR MAC-GWRFL 1.9 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site December 2001 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Project Number UGW-511-0017-12-000 Document Number U0066302 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Document Number U0066302 Contents DOE/Grand Junction Office Ground Water Compliance Action Plan for Old Rifle, Colorado

76

Site observational work plan for the UMTRA Project site at Falls City, Texas  

Science Conference Proceedings (OSTI)

Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy.

NONE

1995-06-01T23:59:59.000Z

77

Final Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

58 58 Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Sites Final February 2003 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC13-02GJ79491 DOE Grand Junction Office EA of Ground Water Compliance at the Slick Rock Sites February 2003 Final Page iii Contents Page Acronyms and Abbreviations...........................................................................................................v Executive Summary...................................................................................................................... vii 1.0 Introduction.............................................................................................................................1

78

Site observational work plan for the UMTRA project site at Grand Junction, Colorado  

Science Conference Proceedings (OSTI)

This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

NONE

1996-01-01T23:59:59.000Z

79

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Coordinator Presentation Identifier (Title or Location), Month 00, 2008 Turbine Thermal Management 2 Materials Development NETL, CFI, WPC, UPitt * Low Cost Bond Coat Systems...

80

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Chris Guenther, Director, Computational Science Division Presentation Identifier (Title or Location), Month 00, 2008 SBEUC Simulation Based Engineering User Center 2 Agenda * A...

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Simulation-Based Engineering David C. Miller, Ph.D. Technical Team Lead, Carbon Capture Simulation Initiative National Energy Technology Laboratory Title, Date Kinetic and...

82

Title Standards 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards 2001 Standards 2001 A guide for the preparation of title evidence in land acquisitions by the United States of America. Quick links to Contents: Table of Contents / Why Title Standards 2001, and who uses it? / Evidence of title / Abstract of Title Supplemental and Supporting Title Evidence / Title Insurance Policies and Certificates of Title / Final Title Evidence Title Evidence for Condemnations / The Deed to the United States / Special Standards for Texas / Sample Forms U.S. Department of Justice Environment and Natural Resources Division Land Acquisition Section Washington, D.C. 20530 December 29, 2000 (reprint March 23, 2001) [Editor's Note: The reprint of March 23, 2001, added page numbers to the table of contents; added a new item "3" to part B of Form # 1 of the Certificate of Inspection and Possession,

83

Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico  

SciTech Connect

Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC {section}7901 et seq.) and the U.S. Environmental Protection Agency`s Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts.

NONE

1995-02-01T23:59:59.000Z

84

UMTRA project water sampling and analysis plan, Riverton, Wyoming  

Science Conference Proceedings (OSTI)

Surface remediation was completed at the former uranium mill site in Riverton, Wyoming, in 1990. Residual radioactive materials (contaminated soil and debris) were removed and disposed of at Union Carbide Corporation`s (Umetco) nearby Gas Hills Title 2 facility. Ground water in the surficial and semiconfined aquifers (known collectively as the `uppermost aquifer`) below the former mill and tailings site has been contaminated. No contamination has been detected in the deeper, confined sandstone aquifer. The contaminant plume extends off site to the south and east. The plume is constrained by surface wetlands and small streams to the east and west of the site and by the Little Wind River to the south. Fifteen monitor wells installed in 1993 were sampled to better define the contaminant plume and to provide additional water quality data for the baseline risk assessment. Samples also were collected from domestic wells in response to a request by the Wyoming Department of Environmental Quality in January 1994. No contamination attributable to the former uranium milling operations have ever been detected in any of the domestic wells used for potable supplies.

Not Available

1994-03-01T23:59:59.000Z

85

U.S. Department of Energy UMTRA Ground Water Project Ground Water Pumping and Monitoring Plan  

Office of Legacy Management (LM)

GWMON 1.12-1 GWMON 1.12-1 U.S. Department of Energy UMTRA Ground Water Project Ground Water Pumping and Monitoring Plan for the Land Farm Pilot Test Monument Valley, Arizona August 2000 Prepared by U.S. Department of Energy Grand Junction Ofice Grand Junction, Colorado Project Number UGW-5 1 1-001 5-21-000 Document Number U0106701 This page intentionally left blank Document Number U0106701 Contents Contents 1.0 Introduction ....................................................................................................................... 1 2.0 Purpose and Scope ........................................................................................................... 1 3.0 Pilot-Test Extraction Wellfield 2 4.0 Water Elevation Measurements and Monitoring ............... 4

86

Available Publications - By Title  

Science Conference Proceedings (OSTI)

... Impact of Natural Ventilation Strategies and Design Issues for California Applications, Including Input to ASHRAE Standard 62 and California Title ...

87

Ii  

NLE Websites -- All DOE Office Websites (Extended Search)

Field Office - Base Period Task Order No.: 003 Task Title: (C) Office of Project Management Required Support: See attached Task Plan and Statement of Work. . Period of...

88

Programmatic Environmental Report for remedial actions at UMTRA (Uranium Mill Tailings Remedial Action) Project vicinity properties  

Science Conference Proceedings (OSTI)

This Environmental Report (ER) examines the environmental consequences of implementing a remedial action that would remove radioactive uranium mill tailings and associated contaminated materials from 394 vicinity properties near 14 inactive uranium processing sites included in the Uranium Mill Tailings Remedial Action (UMTRA) Project pursuant to Public Law 95--604, the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Vicinity properties are those properties in the vicinity of the UMTRA Project inactive mill sites, either public or private, that are believed to be contaminated by residual radioactive material originating from one of the 14 inactive uranium processing sites, and which have been designated under Section 102(a)(1) of UMTRCA. The principal hazard associated with the contaminated properties results from the production of radon, a radioactive decay product of the radium contained in the tailings. Radon, a radioactive gas, can diffuse through the contaminated material and be released into the atmosphere where it and its radioactive decay products may be inhaled by humans. A second radiation exposure pathway results from the emission of gamma radiation from uranium decay products contained in the tailings. Gamma radiation emitted from contaminated material delivers an external exposure to the whole body. If the concentration of radon and its decay products is high enough and the exposure time long enough, or if the exposure to direct gamma radiation is long enough, cancers (i.e., excess health effects) may develop in persons living and working at the vicinity properties. 3 refs., 7 tabs.

Not Available

1985-03-01T23:59:59.000Z

89

Project licensing plan for UMTRA (Uranium Mill Tailings Remedial Action) sites  

SciTech Connect

The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process ( Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs.

Not Available

1984-07-01T23:59:59.000Z

90

Final report of the UMTRA independent technical review of TAC audit programs  

SciTech Connect

This report details the findings of an Independent Technical Review (ITR) of practices and procedures for the Uranium Mill Tailings Remedial Action (UMTRA) Project audit program. The audit program is conducted by Jacobs Engineering Group Inc., the Technical Assistance Contractor (TAC) for the UMTRA Project. The purpose of the ITR was to ensure that the TAC audit program is effective and is conducted efficiently. The ITR was conducted from May 16-20, 1994. A review team observed audit practices in the field, reviewed the TAC audit program`s documentation, and discussed the program with TAC staff and management. The format of this report has been developed around EPA guidelines; they comprise most of the major section headings. Each section begins by identifying the criteria that the TAC program is measured against, then describing the approach used by the ITR team to measure each TAC audit program against the criteria. An assessment of each type of audit is then summarized for each component in the following order: Radiological audit summary; Health and safety audit summary; Environmental audit summary; Quality assurance audit summary.

Not Available

1994-10-01T23:59:59.000Z

91

DOE responses to CDH October 1993 comments on the Remedical Action Plan for the Naturita, Colorado, Umtra Site  

Science Conference Proceedings (OSTI)

This document includes the October 1993 comments provided by the Colorado Department of Health (CDH) on the Department of Energy (DOE) Preliminary Final Remedial Action Plan for the Naturita, Colorado, UMTRA Site. DOE`s responses are included after each CDH comment.

NONE

1996-10-01T23:59:59.000Z

92

Two Line Subject Title One Line Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Status Update: EPAct 2005 Title IX, Subtitle J Section 999 - Project NT42677, "Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Program Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 UDAC Update Presentation Outline * Consortium Accomplishments * UDW Program RFP Summary - 2007 - 2008 * 2009 Funding Disbursement History * 2009 Program / Process Enhancements - Contractual / GAO - Risk Mitigation / Management 3 Overall: * 3 Annual Plans completed * 15 solicitations released under 2007 R&D funding * 43 projects selected for award under 2007 solicitations - 17 Ultra-Deepwater projects - 19 Unconventional Resources projects - 7 Small Producers projects Program Accomplishments Solicitations & Awards 4 * Current Status:

93

UMTRA project water sampling and analysis plan, Grand Junction, Colorado  

Science Conference Proceedings (OSTI)

Surface remedial action will be completed at the Grand Junction processing site during the summer of 1994. Results of 1993 water sampling indicate that ground water flow conditions and ground water quality at the processing site have remained relatively constant with time. Uranium concentrations in ground water continue to exceed the maximum concentration limits, providing the best indication of the extent of contaminated ground water. Evaluation of surface water quality of the Colorado River indicate no impact from uranium processing activities. No compliance monitoring at the Cheney disposal site has been proposed because ground water in the Dakota Sandstone (uppermost aquifer) is classified as limited-use (Class 111) and because the disposal cell is hydrogeologically isolated from the uppermost aquifer. The following water sampling and water level monitoring activities are planned for calendar year 1994: (i) Semiannual (early summer and late fall) sampling of six existing monitor wells at the former Grand Junction processing site. Analytical results from this sampling will be used to continue characterizing hydrogeochemical trends in background ground water quality and in the contaminated ground water area resulting from source term (tailings) removal. (ii) Water level monitoring of approximately three proposed monitor wells projected to be installed in the alluvium at the processing site in September 1994. Data loggers will be installed in these wells, and water levels will be electronically monitored six times a day. These long-term, continuous ground water level data will be collected to better understand the relationship between surface and ground water at the site. Water level and water quality data eventually will be used in future ground water modeling to establish boundary conditions in the vicinity of the Grand Junction processing site. Modeling results will be used to help demonstrate and document the potential remedial alternative of natural flushing.

Not Available

1994-07-01T23:59:59.000Z

94

Two Line Subject Title One Line Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title IX, Subtitle J (EPAct Title IX, Subtitle J (EPAct 2005) Complementary Program - Office of Research and Development September 2008 2 3 Complementary Program NETL - ORD * Areas of research - Drilling Under Extreme Conditions - Environmental Impacts of Oil and Gas - Enhanced and Unconventional Oil Recovery - Resource Assessment * Institute for Advanced Energy Solutions - West Virginia University, Carnegie-Mellon University, and University of Pittsburgh * Penn State University and Oregon State University 4 Drilling Under Extreme Conditions * Ultra-deep single cutter drilling simulator - Recreates bottom-hole drilling environment of ultra-deep wells (30,000 psi and 481 o F) - Delivered to NETL later this year - Operates with real drilling fluids - X-ray video system images cuttings - Verify the results of the full bit

95

UMTRA Project water sampling and analysis plan, Grand Junction, Colorado. Revision 1, Version 6  

Science Conference Proceedings (OSTI)

This water sampling and analysis plan describes the planned, routine ground water sampling activities at the Grand Junction US DOE Uranium Mill Tailings Remedial Action (UMTRA) Project site (GRJ-01) in Grand Junction, Colorado, and at the Cheney Disposal Site (GRJ-03) near Grand Junction. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the routine monitoring stations at the sites. Regulatory basis is in the US EPA regulations in 40 CFR Part 192 (1994) and EPA ground water quality standards of 1995 (60 FR 2854). This plan summarizes results of past water sampling activities, details water sampling activities planned for the next 2 years, and projects sampling activities for the next 5 years.

NONE

1995-09-01T23:59:59.000Z

96

Site observational work plan for the UMTRA Project site at Ambrosia Lake, New Mexico  

SciTech Connect

The Ambrosia Lake Uranium Mill Tailings Remedial Action (UMTRA) Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. The potential for impacts to human health and the environment from contaminated ground water currently does not exist. No domestic or livestock wells accessing ground water from the uppermost aquifer have been identified within a 5 mile radius from the site. Therefore, no current exposure pathways to humans, livestock, or wildlife exist, nor are any foreseen. The proposed ground water compliance strategy under consideration for application at the Ambrosia Lake site is to perform no remediation, based on the application of supplemental standards because the ground water has ``limited use.``

Not Available

1994-09-01T23:59:59.000Z

97

UMTRA Project water sampling and analysis plan, Belfield and Bowman, North Dakota  

SciTech Connect

Surface remedial action is scheduled to begin at the Belfield and Bowman Uranium Mill Tailings Remedial Action (UMTRA) Project sites in the spring of 1996. Water sampling was conducted in 1993 at both the Belfield processing site and the Bowman processing/disposal site. Results of the sampling at both sites indicate that ground water conditions have remained relatively stable over time. Water sampling activities are not scheduled for 1994 because ground water conditions at the two sites are relatively stable, the 1993 sampling was comprehensive, and surface remediation activities are not scheduled to start until 1996. The next water sampling event is scheduled before the start of remedial activities and will include sampling selected monitor wells at both sites and several domestic wells in the vicinity.

1994-08-01T23:59:59.000Z

98

Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site  

SciTech Connect

The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE.

NONE

1995-09-01T23:59:59.000Z

99

Investigator Title Technology  

E-Print Network (OSTI)

Principal Investigator Title Technology Sector State Funds Expended Cost Share Expended Jobs,000 1 Schanbacher, Floyd Development and Commercialization of an integrated Biomass to Electricity Funds Expended Cost Share Expended Jobs Created Average Salary Leverage: Federal $ Leverage: State

100

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Atlas II Atlas II Dawn M. Deel Project Manager - Carbon Sequestration 2 Atlas I - Background and Statistics * 2007 - DOE released the first version of the Carbon Sequestration Atlas of the U.S. and Canada * Result of cooperation and coordination among carbon sequestration experts from local, state, and government agencies, as well as industry and academia * Atlas presented the first coordinated assessment of carbon capture and storage (CCS) potential across the majority of the U.S. and portions of western Canada * Over 3,000 hardcopies released * 1,000 CDs mailed * Daily downloads from NETL website * Widespread media and industry attention * Continued public interest 3 Atlas II * Scheduled for release in November 2008 (GHGT9) * Purpose of this update: To update the CO 2 storage portfolio, document differences in CO

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Two Line Subject Title One Line Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UDAC Recommendations UDAC Recommendations Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 Overview of UDAC 2009 Recommendations Recommendation Areas * R&D Program Focus * Program Scope * Process * Program Progress & Value * Societal Impact 3 R&D Program Focus Area * Safety and environmental projects should be considered as separate topics. * Safety and environmental projects should be identified with specific phases of the exploration and production lifecycle. * The project impact assessment utilized in the project selection process should be made public and available to the UDAC. * Fund projects which address the overall safety impact of UDW activity. * Fund projects which address the overall environmental impact of UDW activity. * The metocean program should be strengthened regarding wind and

102

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Wellbores and Drilling Wellbores and Drilling Brian Strazisar NETL Title, Date ‹#› Technology or Capability Overview * 3 primary efforts related to wellbore cement - Risk of wellbore leakage in CO 2 storage/EOR - Stability of foamed cements in deep offshore wells - Shallow gas migration in shale gas wells * Extreme Drilling Laboratory (XDL) - NETL Facility to study drilling processes under conditions that exist at extreme depths ‹#› CO 2 and Wellbore Leakage Risk * Early NETL work defined mechanism for chemical reaction between CO 2 and wellbore cement. * Degradation of cement determined to be too slow to impact well integrity in the absence of preexisting flow paths CaCO 3(s) barrier (2) Degraded Zone (3) Propagation of Fronts Ca(OH) 2 depleted zone (1)

103

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Track 1A: Oil & Gas Production Track 1A: Oil & Gas Production and Utilization-Overview George Guthrie Office of Research and Development National Energy Technology Laboratory Title, Date ‹#› The Need: Energy portfolio is projected to remain anchored by fossil. Sources: U.S. data from EIA, Annual Energy Outlook 2011; World data from IEA, World Energy Outlook 2010, Current Policies Scenario 79% Fossil Energy 78% Fossil Energy 84% Fossil Energy 81% Fossil Energy * Primarily traditional biomass, wood, and waste. Gas 24% Coal 21% Oil 33% Nuclear 8% Renewables 14% Gas 24% Coal 22% Oil 37% Nuclear 8% Renewables 8% Gas 21% Coal 27% Oil 33% Nuclear 6% Renewables* 13% Gas 22% Coal 29% Oil 28% Nuclear 8% Renewables* 15% + 14% + 47% Energy Demand 2008 Energy Demand 2035 World

104

TITLE48CHAPTER9  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TITLE 48 CHAPTER 9 CODE OF FEDERAL REGULATIONS TITLE 48 CHAPTER 9 CODE OF FEDERAL REGULATIONS DEPARTMENT OF ENERGY ACQUISITION REGULATION TABLE OF CONTENTS Subchapter A - General 901 - Federal Acquisition Regulations System 902 - Definitions of words and terms 903 - Improper business practices and personal conflicts of interest 904 - Administrative matters Subchapter B - Acquisition Planning 905 - Publicizing contract actions 906 - Competition requirements 908 - Required sources of supplies and services 909 - Contractor qualifications 911 - Describing Agency needs 912 - Acquisition of Commercial Items Subchapter C - Contracting Methods and Contract Types 913 - Simplified acquisition procedures 914 - Sealed bidding 915 - Contracting by negotiation 916 - Types of contracts

105

Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site. Final [report  

Science Conference Proceedings (OSTI)

Surface and subsurface soil cleanup protocols for the Gunnison, Colorado, processing sits are summarized as follows: In accordance with EPA-promulgated land cleanup standards (40 CFR 192), in situ Ra-226 is to be cleaned up based on bulk concentrations not exceeding 5 and 15 pCi/g in 15-cm surface and subsurface depth increments, averaged over 100-m{sup 2} grid blocks, where the parent Ra-226 concentrations are greater than, or in secular equilibrium with, the Th-230 parent. A bulk interpretation of these EPA standards has been accepted by the Nuclear Regulatory Commission (NRC), and while the concentration of the finer-sized soil fraction less than a No. 4 mesh sieve contains the higher concentration of radioactivity, the bulk approach in effect integrates the total sample radioactivity over the entire sample mass. In locations where Th-230 has differentially migrated in subsoil relative to Ra-226, a Th-230 cleanup protocol has been developed in accordance with Supplemental Standard provisions of 40 CFR 192 for NRC/Colorado Department of Health (CDH) approval for timely implementation. Detailed elements of the protocol are contained in Appendix A, Generic Protocol from Thorium-230 Cleanup/Verification at UMTRA Project Processing Sites. The cleanup of other radionuclides or nonradiological hazards that pose a significant threat to the public and the environment will be determined and implemented in accordance with pathway analysis to assess impacts and the implications of ALARA specified in 40 CFR 192 relative to supplemental standards.

Not Available

1993-09-01T23:59:59.000Z

106

UMTRA project water sampling and analysis plan, Ambrosia Lake, New Mexico  

SciTech Connect

This water sampling and analysis plan (WSAP) provides the basis for ground water sampling at the Ambrosia Lake Uranium Mill Tailings Remedial Action (UMTRA) Project site during fiscal year 1994. It identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring locations and will be updated annually. The Ambrosia Lake site is in McKinley County, New Mexico, about 40 kilometers (km) (25 miles [mi]) north of Grants, New Mexico, and 1.6 km (1 mi) east of New Mexico Highway 509 (Figure 1.1). The town closest to the tailings pile is San Mateo, about 16 km ( 10 mi) southeast (Figure 1.2). The former mill and tailings pile are in Section 28, and two holding ponds are in Section 33, Township 14 North, Range 9 West. The site is shown on the US Geological Survey (USGS) map (USGS, 1980). The site is approximately 2100 meters (m) (7000 feet [ft]) above sea level.

Not Available

1994-02-01T23:59:59.000Z

107

Header with Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

AL05205018 - Analysis of Gas Turbine Thermal Performance FACT SHEET I. PROJECT PARTICIPANTS Ames National Laboratory Oak Ridge National Laboratory (funded separately) II. PROJECT...

108

Title of Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Asset Definition and Management (ADM) * Service Continuity (SC) Phase II * Controls Management (CTRL) * Enterprise Focus (EF) * Monitoring (MON) 43 Risk Ecosystem example 44...

109

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Sequestration Atlas of the Carbon Sequestration Atlas of the United States and Canada Dawn Deel, Project Manager, Sequestration Division October 5, 2010 2 Background and Statistics Atlas I - March 2007 * First coordinated assessment of CCS in the US and Canada * Provided maps showing number, location and magnitude of CO 2 sources * Maps showing areal extent of geologic storage sites * Storage potential by Partnership * Digital Atlas developed * Over 3,000 hardcopies released: 1,000 CDs mailed * Daily downloads from NETL website Atlas II - November 2008 * Updated the CO 2 storage portfolio * Documented differences in CO 2 resource and CO 2 capacity * Provided CO 2 emission estimation for stationary sources * Described Interagency collaboration * Illustrated federal lands CO 2 geologic storage potential

110

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Annual Meeting Partnership Annual Meeting Terrestrial Best Practices Manual Sean I. Plasynski, PhD Sequestration Technology Manager November 16, 2009 Mostly CO 2 CO 2 Mostly H 2 Mixed Gas Stream and other gases 2 BSCSP WESTCARB SWP PCOR MGSC MRCSP SECARB Terrestrial Project Categorization Agricultural soils Soil Reclamation Afforestation Accounting/Aggregation Wetlands Reclamation J A B C D E F G I H K Terrestrial Field Tests - Tree-plantings - No-till farming - Wetlands restoration - Land management: grasslands, grazing lands - Fire management - Forest preservation - Monitoring, mitigation, and verification technologies 3 CCS Best Practice Manuals Critical Requirement For Significant Wide Scale Deployment Capturing Lessons Learned Best Practice Manual Version 1 (Phase II) Version 2 (Phase III) Final Guidelines

111

Report Title: Mapping  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: Title: Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic Data Report Type: Final Technical Report Reporting Period Start Date: October 1, 2000 Reporting Period End Date: September 30, 2004 Principal Authors: Albert C. Reynolds, Dean S. Oliver, Yannong Dong, Ning Liu, Guohua Gao, Fengjun Zhang & Ruijian Li Date Report Issued: December 2004 DOE Award Number: DE-FC26-00BC15309 Petroleum Engineering Department The University of Tulsa 600 South College Avenue Tulsa, Oklahoma 74104 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product,

112

II  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Page 1 of2 Page 1 of2 (HIOlo U.S. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:State of Oklahoma PROJECT TITLE: OKLAHOMA SEP ARRA - Native American Cultural & Educational Authority STATE: OK Funding Opportunity Announcemcnt Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000052 EEOOOQ133 GF0-09-332-OO7 0 Based on my review oftbc information concerning the proposed adion, as NEPA Compliance Officer (authorized under DOE Order 45I.1A).1 have made tbe following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

113

Presentation title goes here  

NLE Websites -- All DOE Office Websites (Extended Search)

Future of DR Future of DR March 3, 2011 Sila Kiliccote, Mary Ann Piette, Dave Watson, Rish Ghatikar Deputy, DRRC Program Manager, LBNL SKiliccote@lbl.gov 2 Presentation Overview * Trends * Policy * Technology * Implementations * Load As Resource in Ancillary Services Markets * Future directions towards responsive buildings 3 Trends Policy Dynamic Rates - Large C&I, residential, small commercial Codes and Standards -Title 24, US Green Building Council's LEED Credits Smart Grid Standards effort Ancillary Services Technology Integration of Renewables Energy Storage Technologies - Can DR replace storage? PHEVs and EVs Implementation Linking Energy Efficiency and DR Utility Implementations Smart Grid Investment and Demonstration Grants 4 Demand Side Management and Automated DR Future

114

II  

Office of Legacy Management (LM)

II II c )3 c F r c L LI L rr c - r I P- c OAK RlDGE NATIONAL LABORATORY h U W -l\ &?ir;; ITi' m . 8 ORNL/RASA-92/l Results of the Radiological Survey at the Former Chapman Valve Manufacturing Company, Indian Orchard, Massachusetts (cIooo1) R. D. Foley M . S. Uziel MANAGED BY MARTIN MARIETTA ENERGY SYSTEMS, INC. FOR THE UNITED STATES DEPARTMENT OF ENERGY ORNLJRASA-92/l /- HEALTH AND SAFETY RESEARCH DIVISION Environmental Restoration and Waste Management Non-Defense Programs (Activity No. EX 20 20 01 0; ADS317OOOO) Results of the Radiological Survey at the Former Chapman Valve Manufacturing Company, Indian Orchard, Massachusetts (cIooo1) R. D. Foley and M. S. Uziel Date Issued - July 1992 Investigation learn R. E. Swaja - Measurement Applications and Development Manager

115

Annual report on the U.S. Department of Energy`s Cultural Resource Activities at Colorado UMTRA Project Sites for October 1993 through September 1994  

SciTech Connect

This report summarizes the results of cultural resource activities conducted by the U.S. Department of Energy (DOE) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado for the period of October 1, 1993, through September 30, 1994. The UMTRA Project is a cooperative (state and federal) program mandated by the Uranium Mill Tailings Radiation Control Act, Public Law 95-604 (42 USC {section}7901 et seq.). This law requires the timely cleanup of 24 inactive uranium mill tailings sites throughout the United States. Nine of these inactive uranium mill tailings sites are in Colorado at Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock. On December 6, 1984, the DOE, Advisory Council on Historic Preservation, and Colorado State Historic Preservation Officer (SHPO) entered into a programmatic memorandum of agreement (PMOA) (DOE, 1984). This PMOA specifies requirements for the DOE`s fulfillment of its obligations under various state and federal regulations for the protection and preservation of cultural resources. This report fulfills the requirement for the DOE to provide the state of Colorado with an annual report on the cultural resource activities performed for all of the UMTRA Project sites in Colorado. This report is organized by UMTRA Project site. For each site, the general remedial action activities and cultural resource activities performed during the period of record are summarized. When known, the DOE`s plans for future cultural resource activities at the site are summarized.

Not Available

1994-11-01T23:59:59.000Z

116

II  

Office of Legacy Management (LM)

: " + ; . .Z + II . ? 8 . " ~. . . . a a' .; ,. ?> , . ' . : . ., ! , Environmental i r .,' : % , ~ ~ 9 . / ; i.3. -\ ,- I - 'I ' , 2 " .r: 1; . . , ~ . ,&- c . . a , ,, .,I;< . .' , , ? $ ; 1- !'I' . '...~ - .. :, , .I Closure Report for CAU No. 416 1: ' . Project Shoal Area I:' c!';,: .. 7. .. , . ~ 1 I' ,. Controlled Copy No. UNCONTROLLED { -* .. 4'. . 1 " . .. *. *" '.. . . , , ,I +' , ,.f.' I , I" I ', ', ctk;' . , I , '. :C, , I: : , . p . ? .,; . s . " . , k - ,

117

Title 44 Excerpts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Excerpts 4 Excerpts The United States Code - Title 44 PUBLIC PRINTING AND DOCUMENTS And Miscellaneous Statutes Identify the Authority of the Joint Committee on Printing 1997 EDITION CHAPTER 5 - PRODUCTION AND PROCUREMENT OF PRINTING AND BINDING Section 501. Government printing, and blank-book work for Congress, the Executive Office, the Judiciary, other than the Supreme Court of the United States, and every executive department, independent office and establishment of the Government, shall be done at the Government Printing Office, except- (1) classes of work the Joint Committee on Printing considers to be urgent or necessary to have done elsewhere; and (2) printing in field printing plants operated by an executive department, independent office of establishment, and the procurement of printing by an executive department,

118

Annual report to the Advisory Council on Historic Preservation and the Colorado State Historic Preservation Officer on the US Department of Energy's cultural resource activities at Colorado UMTRA Project sites, January--December 1991. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

Science Conference Proceedings (OSTI)

This report is a summary of the US Department of Energy's (DOE) cultural resource investigations for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado. This report is intended to fulfill the DOE's obligation for an annual report as stated in the Programmatic Memorandum of Agreement executed between the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer in December 1984. Summaries of the cultural resource surveys and identified resources are provided for the UMTRA Project sites in the vicinities of Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock. This report covers all UMTRA Project cultural resource activities in Colorado from January through December 1991.

Not Available

1992-04-01T23:59:59.000Z

119

No Slide Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BROOKHAVEN SCIENCE ASSOCIATES BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Risk Management Diane Hatton Associate Director, NSLS-II Project Support Division, BNL November 4, 2009 2 BROOKHAVEN SCIENCE ASSOCIATES Risk Management Steps * identify potential vulnerabilities/risks * determine their likelihood of occurring * assess their impact on the project technical, cost, and schedule baselines * determine activities that would reduce/mitigate the risk Consolidated risk entries to manageable numbers * execute a plan to accomplish these risk-reducing activities * risk reporting/tracking STEP 1 3 BROOKHAVEN SCIENCE ASSOCIATES Risk Management Steps * Bottom up Risk Analysis produced 407 Risk Register Entries * Mixture of risks (can be mitigated) and uncertainties (things beyond our control) * Repetition and redundancy (e.g. higher than usual inflation and exchange rate, out-year

120

1987 annual report to the Advisory Council on Historic Preservation and the Colorado State Historic Preservation Officer on the Department of Energy's cultural resource activities at Colorado UMTRA Project sites. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

SciTech Connect

This report is a summary of the Department of Energy's (DOE) cultural resource investigations related to the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado. This report is intended to fulfill the DOE's obligation for an annual report as stated in the Programmatic Memorandum of Agreement executed between the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer in December, 1984. A summary of the cultural resource surveys and identified resources is provided for project sites in the vicinities of Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. This report summarizes all DOE UKTRA Project cultural resource activities in Colorado for the 1987 calender year.

Not Available

1988-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

INSERT PRESENTATION TITLE HERE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S. Department of Energy S. Department of Energy National Electric Transmission Congestion Study Workshop Saint Louis, Missouri December 8, 2011 Maureen A. Borkowski President & CEO, Ameren Transmission Company 2 CONGESTION IN THE MIDWEST * Midwest ISO performs regular congestion studies looking at historical and expected future congestion - Top Congested Flowgate Study - Cross-Border Congested Flowgates (with PJM) * Significant congestion exists in several areas - Southeast Missouri, Southern Illinois and Indiana - Chicago area, Southern Wisconsin and Northern Indiana surrounding Lake Michigan - Indiana and Kentucky border * Historically, dozens of transmission projects were evaluated to mitigate congestion on the top congested flowgates - RECB II Benefit/Cost Threshold was used - Only one small project passed the criteria

122

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

- - Hydrogen Pilot Plant and H2-ICE Vehicle Activities Jim Francfort Idaho State University November 2006 INL/MIS-06-11935 Presentation Outline * Background & Goal * Arizona Public Service (APS) Alternative Fuel (Hydrogen) Pilot Plant - design & operations - Hydrogen subsystem - CNG subsystem - Auxiliary & Safety systems * Fuel Dispensing * Hydrogen & HCNG Internal Combustion Engine (ICE) Vehicle Testing Activities * Gen II station * Barriers & Applications * WWW Information AVTA Background & Goal * Advanced Vehicle Testing Activity (AVTA) is part of the U.S. Department of Energy's FreedomCAR and Vehicle Technologies Program * These activities are managed by the Idaho National Laboratory (INL also performs data analysis and reporting activities) * AVTA Goal -

123

Click to add title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Congestion Bob Bradish Managing Director, Transmission Planning & Business Development American Electric Power U.S. Department of Energy National Electric Transmission Congestion Study Workshop December 6, 2011 2 American Electric Power 5.2 million customers in 11 states ~18,000 employees Largest distributor of electricity in the U.S. - 215,800 miles Largest transmission owner - 39,000 miles 2 nd largest generator - 39,000 MW Operations in 3 RTOs - PJM, SPP, & ERCOT 3 Value of 2009 Study * The study conclusions were appropriate - Identified historical congestion - Overly broad, missed some areas - Type I and Type II areas are generally accurate but could be improved - especially Type I - Limited ability to address emerging issues 4 Changing "State of Congestion"

124

Header with Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

42648 - Micro-Mixing Lean Premix Systems for Ultra-Low Emission 42648 - Micro-Mixing Lean Premix Systems for Ultra-Low Emission Hydrogen/Syngas Combustion 12/15/2006 FACT SHEET I. PROJECT PARTICIPANTS Parker Hannifin Corporation (Lead) Gas Turbine Fuel Systems Division, 9200 Tyler Blvd., Mentor OH 44060 PI: Dr. Adel Mansour (e-mail: amansour@parker.com, Ph.: 440-954-8171) University of California at Irvine UCI Combustion Laboratory, Irvine, CA 92617 Solar Turbines Incorporated 2200 Pacific Highway, San Diego CA 92101 II. PROJECT DESCRIPTION A. Objective(s) The overall objective of this DOE-Supported research and development program is to develop and test a next-generation, practical and scalable, high-performing, multi-point injector module for hydrogen and syngas fuels. The injector will use Parker Hannifin's

125

Header with Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

5NT42646 Zero Emissions Coal Syngas-Oxygen Turbo Machinery 5NT42646 Zero Emissions Coal Syngas-Oxygen Turbo Machinery FACT SHEET (42646) Oct. 2006 I. PROJECT PARTICIPANTS A. Siemens Power Generation, Inc. B. Florida Turbine Technologies, Inc. C. Clean Energy Systems, Inc. II. PROJECT DESCRIPTION A. Objective(s) - To develop a cost effective and highly efficient turbo machinery system that will work with an oxy-fuel combustor that generates very high temperature CO2 and steam mixture as the working fluid. After expansion of the working fluid, the CO2 is captured allowing near-zero emissions of NOx and carbon. The project will complete conceptual designs of alternate steam cycles and select one cycle for detailed design based on cost and feasibility studies. B. Relevancy - 1. Background: CES, Inc. has an operational oxy-fuel combustor that generates

126

Header with Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Shock Wave Compression rev060908, 6/14/06, rev 9/8/06 Shock Wave Compression rev060908, 6/14/06, rev 9/8/06 FACT SHEET Rampressor Shock Wave Compressor , DE-FC26-06NT42651 (Ramgen Power Systems, RPS) I. PROJECT PARTICIPANTS A. Prime Participant: Ramgen Power Systems, Inc (RPS) under cooperative Agreement DE-FC26-06NT42651 B. Sub-Award Participants: ASE Technologies (ASE), Manufacturing Resources Inc. (MRI), Geminus Technologies Development (GTD), Steve Kushnick, P.E., Alouette Technology. II. PROJECT DESCRIPTION A. Objective(s): Based on aerospace ramjet technology, Ramgen Power Systems is developing a novel more cost effective compressor concepts (air and carbon dioxide) for support of coal fueled gasification stationary power applications and for potential replacement of the compressor component in gas turbines.

127

Title IX | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IX IX Title IX Title IX of the Education Amendments of 1972, as amended, prohibits discrimination on the basis of sex in all educational programs and activities of institutions that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the basis of sex, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any education program or activity receiving federal financial assistance. Click here to learn more: 20 U.S.C. § 1681(a) The Office of Civil Rights is responsible for monitoring and enforcing compliance with Title IX, investigating Title IX-related complaints, and providing technical assistance related to Title IX to recipients of Department of Energy financial assistance.

128

Annual report on the U.S. Department of Energy`s cultural resource activities at Colorado UMTRA Project sites for October 1995--September 1996  

SciTech Connect

This report summarizes the results of cultural resource activities conducted by the U.S. Department of Energy (DOE) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado for the period of October 1, 1995 through September 30, 1996. The inactive uranium mill tailings sites in Colorado are at Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock. On December 6, 1984, the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer (SHPO) entered into a programmatic memorandum of understanding (PMOU). This PMOU requires the DOE to fulfillment of its obligations under various state and federal regulations for the protection and preservation of cultural resources. This report provides the state of Colorado with an annual report on the cultural resource activities performed for all UMTRA Project sites in Colorado. Due to the completion of surface activities at the UMTRA Project sites, this will be the last annual report to the state of Colorado. Cultural resources activities subsequent to this report will be reported to the state through site-specific correspondence.

NONE

1996-09-01T23:59:59.000Z

129

Title VI | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

VI VI Title VI Title VI of the Civil Rights Act of 1964 prohibits discrimination on the basis of race, color, and national origin in programs and activities that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance. The Office of Civil Rights is responsible for monitoring and enforcing compliance with Title VI, investigating Title VI-related complaints, and providing technical assistance to recipients of Department of Energy financial assistance. The Department has promulgated regulations that

130

G Subject: Implementation of Division B, Title III, Title V and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No. 112-74 References: Consolidated Appropriations Act, 2012,...

131

Measuring solar reflectance-Part II: Review of practical methods  

NLE Websites -- All DOE Office Websites (Extended Search)

II: Review of practical methods Title Measuring solar reflectance-Part II: Review of practical methods Publication Type Journal Article Year of Publication 2010 Authors Levinson,...

132

title Brookhaven National Laboratory Brookhaven National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

item item title CDATA Scientists Discover Hidden Magnetic Waves in High Temperature Superconductors title description CDATA X ray technique reveals surprising quantum...

133

Process for Transition of Uranium Mill Tailings Radiation Control Act Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Uranium Mill Tailings Radiation Control Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance (March 2012) Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance (March 2012)

134

Supplement to the site observational work plan for the UMTRA project site at Ambrosia Lake, New Mexico  

SciTech Connect

The purpose of this document is to provide additional and more detailed information to supplement review of the site observational work plan (SOWP) (DOE, 1995) for the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This document includes a discussion of the average linear velocity of the ground water in the alluvium and a discussion of the ground water quality of the alluvium, weathered Mancos Shale, and the Tres Hermanos-C Member of the Mancos Shale. The data from a 1989 aquifer test were analyzed using the curve-matching software AQTESOLV and then compared with the original results. A hydrograph of the ground water elevations in monitoring wells screened in the alluvium is presented to show how the ground water elevations change with time. Stiff and Piper diagrams were created to describe the changes in ground water geochemistry in the alluvium/weathered Mancos Sahel unit, the Tres Hermanos-C Sandstone unit, the Tres Hermanos-B Sandstone unit, and the Dakota Sandstone. Background information on other related topics such as site history, cell construction, soil characteristics, and well construction are presented in the SOWP. A geologic cross section depicts the conceptual model of the hydrostratigraphy and ground water chemistry of the Ambrosia Lake site. Hydrogeologic information of each hydrostratigraphic unit is presented.

NONE

1995-11-01T23:59:59.000Z

135

Supplement to the site observational work plan for the UMTRA Project Site at Ambrosia Lake, New Mexico  

SciTech Connect

The purpose of this document is to provide additional and more detailed information to supplement review of the site observational work plan (SOWP) for the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This document includes a discussion of (1) the average linear velocity of the ground water in the alluvium; (2) the ground water quality of the alluvium, weathered Mancos Shale, and the Tres Hermanos-C Member of the Mancos Shale; and (3) the fate and transport of contaminants from the uppermost aquifer to the Westwater Canyon Member of the Morrison Formation. The data from a 1989 aquifer test were analyzed using the curve-matching software AQTESOLV and then compared with the original results. A hydrograph of the ground water elevations in monitoring wells screened in the alluvium is presented to show how the ground water elevations change with time. Stiff and Piper diagrams were created to describe the changes in ground water geochemistry in the alluvium/weathered Mancos Shale unit, the Tres Hermanos-C Sandstone unit, the Tres Hermanos-B Sandstone unit, and the Dakota Sandstone. Background information on other related topics such as site history, cell construction, soil characteristics, and well construction are presented in the SOWP. Figure 1 is a geologic cross section depicting the conceptual model of the hydrostratigraphy and ground water chemistry of the Ambrosia Lake site. Table 1 presents hydrogeologic information of each hydrostratigraphic unit.

NONE

1996-02-01T23:59:59.000Z

136

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Value Propositions for Four Value Propositions for Four Modular Electricity Storage Demonstrations in California EESAT 2007 San Francisco by Distributed Utility Associates, Inc. Jim Eyer, Senior Analyst jim@dua1.com Susan Horgan, President susan@dua1.com Funded by the Energy Storage Systems Program of the U.S. Department Of Energy (DOE/ESS) through Sandia National Laboratories (SNL). EESAT 2007 - Eyer - DUA 2 Agenda * Scope * Background * Assessing Value Propositions * Supercapacitor for Sacramento Light Rail * Supercapacitor for Load & DG Integration * Flow Battery for T&D Deferral * Flywheel for Area Regulation * Outlook EESAT 2007 - Eyer - DUA 3 Scope * DOE ESS partnership with CEC/PIER - innovative electricity storage demonstrations in California that are sponsored by CEC/PIER * DUA: Evaluation and Report

137

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Brad Tomer Brad Tomer Director, Strategic Center for Natural Gas & Oil EPACT Section 999 Federal Advisory Committee Meetings January 28-29, 2008 Strategic Center for Natural Gas and Oil Strategic Center for Natural Gas & Oil * Create public benefits by investing in research that industry would not take on itself * Deliver a balanced portfolio of technology to: - Enable Independents to efficiently produce discovered resources - Conduct long-term/high risk R&D - develop entirely new sources of supply - Minimize environmental impact Implement science and technology programs that resolve the environmental, supply and reliability constraints of oil and natural gas resources and enhance our energy security A multi-discipline, long-term, high-risk, and high-reward endeavor that

138

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ultra-Deepwater Advisory Ultra-Deepwater Advisory Committee Recommendations - 2007 Annual Plan Brad Tomer, Director Strategic Center for Natural Gas & Oil January 30, 2008 Strategic Center for Natural Gas and Oil Federal Advisory Committee Recommendations for 2007 Draft Plan * All recommendations were accepted - Incorporated into the final 2007 Annual Plan - Addressed in an otherwise appropriate manner * This review is designed to briefly re-state summarized recommendations and DOE's response. Detailed discussions should be deferred until later in the day. Strategic Center for Natural Gas and Oil Ultra-Deepwater Advisory Committee Sub-Groups * R&D Theme Content * Solicitation Process * Environmental * Access Strategic Center for Natural Gas and Oil UDAC Recommendations for 2007 Plan

139

TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ClTY/CO{TRIBAL): ClTY/CO{TRIBAL): DAT E RE CEIVED: CA-TR iBE-TABLE MOUNTAIN RANCHERIA OF CALIFORN IA 61 735 1 937 Tribe Oak Ridge Office COMPLETE STATE: CA Round Two Review: t I BRIEF DESCRIPTION: Develop energy efficiency and con servation strategy and fea si bility study ofthe Rancheria energy usage NEPA REVI EW ER NEPA DECISION (CX/EA/EIS): NHPA ISSU ES NEPAjNHPA CONDITIONS: S.G. Thornton ex CX APPLIED: CX-EECBG -001 LI SUBPART D REF Approval for strategy/feasibility st udy only Ny( Compliance Officer (NCO) Review, including consideration of extraordiOilfy circumstiinceS: ~ction may be categorically ucluded from further NEPA review. I hilve dete rmined that the proposed action meets the requirements for Cltegorical exclusion in Subpart D, Appendix A or B. C Action requires approvill by Head oft

140

TITLE  

Office of Legacy Management (LM)

CHAPTER lV CHAPTER lV 1. PURPOSE. This chapter presents radiological protection requirements and guidelines for cleanup of residual radioactive material and management of the resulting wastes and residues and release of property. These requirements and guidelines are applicable at the time the property is released. Property subject to these criteria indudes, but is not limited to sacs identied by the Formerly Utilized Sites Remedial Action Program (FUSRAP) and the Surplus Facilities Management Program (SFMP). The topics covered are basic dose limits, guidelines and authorized limits for allowable levels of residual radioadive material, and control of the radioactive wastes and residues. This chapter does not apply to uranium mill tailings or to properties covered by mandatory legal requirements.

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

TITLE  

Office of Legacy Management (LM)

e ~ a r t m e n t of Energy Oak Ridge Operations P.O. Box 2001 Oak Ridge. Tennessee 37831- November 7, 1995 Dave To1 b e r t B&T Metals Company & B&T F l o o r Company P. 0 . Box 163520 Columbus, Ohio 43216-3520 Dear M r . To1 b e r t : REAL ESTATE LICENSE REORDOER-7-96-0103, B&T METALS COHPANY, COLUMBUS, OH Enclosed f o r your records i s a copy o f the f u l l y executed 1 icense between B&T Metals Company and the Department o f Energy. Is t h e separate l i c e n s e f o r B&T F l o o r Company a l s o being transmitted t o t h i s o f f i c e ? Thank you f o r your cooperation and assistance i n t h i s action. I f you have any questions concerning t h e r e a l e s t a t e instrument, please f e e l f r e e t o contact m e a t 423- 576-0977. Sincerely, Katy Kates Realty O f f i c e r Enclosure As stated

142

TITLE  

Office of Legacy Management (LM)

Date: 11/21/35 10:12:16 AM Date: 11/21/35 10:12:16 AM 136930 From: HARTMANGSOoro.doe.gov Subject: Re: CX Determination - B&T Metals Removal Action (FUSRAP-036 HOW about this! This is the first CX determination that we have done electronically - - - same-day turnaround!!! Gary Forwarding routing: Les Price, PSRD Bill Seay, FSRD Dave Adler, PSRD Loren Marz, PSRD Gerry Palau. BNI Dave Sexton, BNI Teresa Noe, BNI (PDCC) Forward Header :~Liject: Re: CX Determination - B&T Metals Removal Action (PUSPAP-036 i~thor: PHILLIPSPW at SE31 8 s 1-5 : 11/21/95 12:OO PM Based on the recommendation of Gary Hartman, Environmental Scientist, EW93, I determine that the subject proposed action is categorically excluded from further NEPA review and documentation. Patricia W. Phillips

143

TITLE  

Office of Legacy Management (LM)

. . · MONTICELLO NPL SITES FFA QUARTERLY REPORT: January 1- March 31, 2007 DOE Site Manager: Jalena Maestas 1.0 MMTS Activities/Status Repository and Pond 4 * Monthly and quarterly inspection of the repository identified no problems other than shrub damage by voles (inspection checklists attached). * Monthly inspection of Pond 4 identified no unacceptable conditions. * Pond 4 leachate detection and removal systems operated at normal levels (leachate pumping summary attached). * Repository leachate collection and removal system (LCRS) and leachate collection system (LDS) operated at normal levels (leachate pumping summary attached). * Equipment purchased to upgrade repository LCRS and LDS remote sensing and telemetry system. * Portions of repository cover were manually re-seeded with desirable shrubs to repair areas

144

TITLE  

Office of Legacy Management (LM)

RIDOH RIDOH NArnONAL LABORATORY c- Results of the Independent Radiological Verification Survey I.* K . . . . 1 A . T I r n * at the Former Associate Aircraft Tool and Manufacturing Company Site, Fairfield, Ohio - (FOH001) D . E . Rice M . E . Murray K. S . Brown EEALTH SCIENCES RESEARCH DMSION E ' * I ~ m d w a s k M ~ t ~ ~ ~ ( ~ N o . E X Z D 2 0 0 1 O; AB131DM) Aircraft ~ o o l and Manrlaet~ring Company Site, Fiirfleld, Oh10 (FOH001) D. E. Rice, M. E. Mumy, K:S. Brown . . . . lmza@am Tam R D. FdeJr-E-tAppholboPl4DCrdDPllLlltW D. E . Rice - Suvsy Tam iada 1 3 9 3 1 9 CONTENTS .................................................. LISTOFFI- v .................................................. LISTOFTABLES 6 A C K N O - S ............................................. u ABSTRACT ....................................................... xi

145

TITLE  

Office of Legacy Management (LM)

Formerly Utilized Sites Remedial Action Program (FUSRAP) Formerly Utilized Sites Remedial Action Program (FUSRAP) - Contract No. DE-ACOS-9 1 OR21 949 Post-Remedial Action Report for the 8. & T Metals Site Columbus, Ohio October 1996 POST-REMEDIAL ACTION REPORT f OR THE . . B&T METALS SITE COLUMBUS. OHIO OCTOBER 1 W6 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-ACOS-91 OR2 1949 I Bechtel National, Inc. Oak Ridge, Tcnncssoe I Bcchtel lob No. 14501 CONTENTS Page FIGURES ............................................................................................................................................... iv TABLES ................................................................................................................................................ iv

146

TITLE  

Office of Legacy Management (LM)

Verification Verification Survey at B&T Metals, 425 West Town Street, Columbus, Ohio M. E. Murray V. P. Patania C. A. Johnson This report h s ken rcpmduccd directly from the t f s i avail3ble copy. Avaihble to DOE and DOE c o n m u x s from the Olficc of Scienlific and Technical inlormaliar. P.O. Boa 6 1 . W Ridsee. l X 378331: priccsav&lable from (6t5) 576-8101, TTS 6268401. A v ~ i t b I e t o h e public lmm the Naliorul Technical Inlormalion Service. U.S. Dcpvtmenl 01 Commcrcc. 5285 Pon Royal Rd.. Springlield. VA 22161. This rcpon was prep& as an account o f work sponsored by an agency o f thc Unircd Sutcs Govcmmcnr. X c i h c ~ thc Uniicd Sulcs Govcrnmcn~ nor any ;Igcncy, Lhcrcol. nor any of theu crnployccs, mikes my warmly. cxprcss, or implicd.or assumcs my legal l i i i l

147

TITLE  

Office of Legacy Management (LM)

Peccrdei et .... g:~.g-..o*c *ck .*,- Peccrdei et .... g:~.g-..o*c *ck .*,- &.-. fi+ E C 7 ---.----.- .-.... 3$rS --------- ixx4!30 F A ~ 953 ' 27565' glla 5tcpEe.l. Peeorder Reception N o . - STATE OF COtOPA00 COUFlTY OF GARFIELD MfEREAS, under date of kcember 7 , 1966, an oil and gas l e a s e was entered i n t o between Claude V. Hayward, lessor, snd Rustrat dl1 Ccmpany Incorporated, Lessee, covering, among other l a n d s , t a t 1 1 , being the Northeast Quarter ~b the Southwest Q u a r t e r o f Section 25, f - 7 4 , R-95-W, Garfield County, Calnrnda, sa3d lease being recorded O n 86ak 381, Fag? 418, o f the ~rritdrd$ of B a r f leld County, C s l o r e d ~ ; and @ WWEEA., under date o f l%y 5 , 1967, a U n l t Agrarmnt fas the Dcvelapmnt and Opcratlon o f the Rulison Vn4 t Area I n Gsrfield and He58 Counties Colorado, was entered 1 nto betwen Aus t r

148

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recipients Recipients For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or go to: http://www.FederalReporting.gov 1 Outline of Presentation * Timeline * Helpful Hints for Repeat Reporters * When is FederalReporting.gov Reporting Complete? * FederalReporting.gov Features For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or

149

Title  

U.S. Energy Information Administration (EIA)

Important Aside--Percentage of Ethanol (Alcohol) ... Perform annual comparisons of fuel ethanol plant capacity data from both EIA and non-EIA sources with EIA fuel ...

150

TITLE  

Office of Legacy Management (LM)

and those taken before remedial action) and removal-type actions similar in scope under RCRA and other authorities (induding those taken as partiat closure actions and those...

151

TITLE  

Office of Legacy Management (LM)

Schedule based on a 9-mo.year construct ion period, Not total cost for cleanup. Pair market price could be 168,000. VOLUME (1000 CUBIC METERS) NOTE: To convert to cubic...

152

TITLE  

Office of Legacy Management (LM)

Description of the Formerly Utilized Description of the Formerly Utilized Sites Remedial Action Program United States Department o f Energy "This book w l r prepartd u a n account 01 wo* lporuond by m uency o f the Unhd Sutes Govrrnmrnt. N a l h r t the United StalrsGovrrnment nos i n y m y lhumf, rm any 01 lheh employees, makes any .nrrmly, u p m r or impkd, or arrunrr my I@ LirbHty or rcsponiibiiily for ihe rccutrcy. wmplaenm. 01 u ~ l u l n e ~ i of any intotnulion, mppmtur, p f d u c t , 01 p r o m s d i ~ l o w d , or rtprrlrntr that i s we MUM mi initlnp plivmdy omd rightr Refnrnce herein L o m y rpedfw wmmrcial produel, pmarr, o r s e n h by b a d e name, tr.demaR, mmufrctunr, or othcrurtrr, doer not mcnrrlly m n n h u u m its endoncmmt, rccommmdalion, or favorin# b y the United Stater Govmment or my y m ~ y thacol. The vi+ur and opiljOna o

153

TITLE  

Office of Legacy Management (LM)

J J a s 1. Besl President Force Control Industries 3664 Dixla H i 9 h p ~ Falrfleld, Ohio 45014 Dear Hr. Besl: With your consent,. the U.S. Dcpartwnt o f Energy (WE) conducted a r a d i o l q l l c a l survey a t the Former Associate A i r c r a f t Tool and Manufrcturlng Conpany s l t e i n Fairfield, Ohio. OOE has received the-auwey report frm i t s survey. contractor, Oak Rldge national Laboratory (OWL). Two copies o f the report are enclosed f o r your information and use. 71.5 report C 0 n ~ l ~ d e S that uranium i s present I n the f a c i l l t y I n excess of the ME guidelines f ~ r restdual r a d l o i c t i v e matertal. This conclusion i s based on d i r e c t radiation r a s u r a r n t s (shorn graphically on Flgures 8 , 9, 14, and Table 5 on pages 8, 9, 22, and 29, respectively) and om analysls o f s o i l samples, dust sllples, m

154

TITLE  

Office of Legacy Management (LM)

SHOAL AREA SHOAL AREA TRACER TEST EXPERlIMENT prepared by Rosemary Carrolt, Todd Mihevc, Greg Pohll, Brad Lyles, Sean Kosinski and Rich Niswonger submitted to Nevada Operations Office U.S. Department of Energy Las Vegas, Nevada NOVEMBER 2000 Publication No. 45177 Reference herein to any specific commercial pmduct, process, or service by trade name, trademark, mufacturer, or otherw~se, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof or its contractors or subcontractors. The views a d opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. This report has been reproduced directly from the best available copy.

155

TITLE  

Office of Legacy Management (LM)

- . ' R U L 000003 United States Office of Radiation and ~ ~ ~ - 4 0 2 7 ~ - 0 2 - 0 0 7 Environmental Protection 1ndoor Air November 2002 Agency Washington, DC 20460 &EPA Annual Water Sampling and Analysis, Calendar Year 2002: SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RIO BLANCO Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 2002 SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RIO BLANCO Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Max G. Davis Terry L. Mouck Prepared for the U.S. Department of Energy under Interagency Agreement DE-AI08-96NV11969 RADIATION AND INDOOR ENVIRONMENTS NATIONAL LABORATORY OFFICE OF RADIATION AND INDOOR AIR

156

TITLE  

Office of Legacy Management (LM)

-. -. i . , . United States Government L-u+-tw / S / V ~ f Department of nersy memorandum D i T E June 0 5 , 1995 FEP-Y ATTK OF: EM-421 (U. A. Williams, 301-903-8149) SUGJECT Hazard Assessmnt f o r Radioactive Contamination a t the Associate. A i r c r a f t Site, F a i r f i e l d , Ohio To L. Price, OR This memorandum i s t o ' provide comments and approval o f the Associate i r ft i t n f o r e n ' i A r c a S eHazardAssessmet I d t i f e d S o i l C ~ m i n a t i o n . The hazard assessment was prepared and supplemental 1 i m i t s were requested, based on a single s o i l sample w i t h 134 picocuries per gran o f uranium. This sample was obtained from underneath the b u i l d i n g slab i n an area t h a t was a loading dock f o r the f a c i l i t y during Atomic Energy Comnission operations during the 1950s. The area i s n o t r e

157

TITLE  

Office of Legacy Management (LM)

amv. amv. I.. - - DESlON CRITERIA FOR f ORMERLV UTILIZISU 81TEb REMEDIAL ACTIUN PROORAM [FUmRAP) AND BURPLUS FACILITIES MANAOEMENT D E S I G N C R I T E R I A POR FORMERLY U T I L I Z E D S I T E S REHEDIAL ACTION PROGRAM (?USRAP). AlPD SURPLUS FACILITIES MUINAGEHEIT P R O C R U (SFHP) ( I S S U E D FOR C L I E N T APPROVAL) FEBRUARY 1 9 8 6 ~pproved by: a . CI, Director 2- 24-86 Date T e c h n i c a l Services Division Oak RiPge Operations Office Approved by: 2-24-86 Date Construction and E n g i n e e r i n g Oak Ridge Operations Office 14501-00-DC-01 Rev. 1 PREFACE TO DESIGN CRITERIA T h t s t drsiqn criteria have barn-written i n a generic form that sunmarizes criteria applicable for remedial action and long-term mmagcnent activities associated with the radioactive vaster at the fDSRhP end S?HP sites. Site-specific Information is provided in the

158

TITLE  

Office of Legacy Management (LM)

Mi Mi w u United S taies Office of Radiation a ~ d EPA 8 Environmental Protection Indoor Air Dcccmbcr 1999 Q Agency Washington, DC 304hC) EPA-402-R-93-0 12 Q w 0 4 : 0 0 0 4 &€PA Annual Water Samp and Analysis Ca endar Year 1999: RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 1999 RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area GASBUGGY Test Site Area GNOME Test Site Area by Max G. Davis Prepared for the U.S. Department of Energy under Interagency Agreement DE-AIO8-96NVl1969 FL4DIATION AND INDOOR ENVIRONMENTS NATIONAL LABORATORY OFFICE OF RADIATION AND INDOOR AIR

159

TITLE  

Office of Legacy Management (LM)

Post-Remedial Action Report Post-Remedial Action Report for the Alba Craft Site and Vicinity Properties Oxford , Ohio August 1995 POST-REMEDIAL ACTION REPORT FOR THE A D A CRAFT SITE AND VICINITY PROPERTIES OXFORD, OHIO AUGUST 1995 Prepared f o ~ United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-ACO5-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii UNITS OF MEASURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

160

TITLE  

Office of Legacy Management (LM)

, , - :. , L L b ' pi1 2 25. STATE OF MISSISSIPPI a . a . , i l l ; .. - . a ,-. , I , SALMON SITE , , , . . . C I A . - - 1 COUNTY OF LAMAR - T - TRACT NO. 101-E KNOW ALL MEN BY THESE PRESENTS, that, we, MARTHA T. BRIDGES alkla MARTHA TATUM BRIDGES LOPEZ, ROBERT TODD BRIDGES, MARTHA TATUM BRIDGES LOPEZ as Guardian of Nlchoias Carl Bridges, a minor, DIANA W. TATUM, NANCY 0. TATUM, and ADDISON T. TATUM, JR., alkla A. T. Tatum, Jr., whose addreas I s clo Mr. John Burnam, Post Office Box 1828, Hattiesburg, Mlssisslppi 39403, hereinafter referred to as the GRANTORS, for and in consideration of the sum of THREE HUNDRED DOLLARS AND NO1100 ($300.09). the receipt and sufficiency of which are hereby acknowledged, do hereby GRANT. BARGAIN, SELL and CONVEY unto the UNITED STATES OF AMERICA

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

TITLE  

Office of Legacy Management (LM)

Hydrologic Processes and Hydrologic Processes and Radionuclide Distribution in a Cavity and Chimney Produced by the Cannikin Nuclear Explosion I Amchitka Island, Alaska By HANS C. C M S S E N H Y D R O L O G Y O F N U C L E A R T E S T S I T E S G E O L O G I C A L S U R V E Y P R O F E S S I O N A L P A P E R 7 1 2 - D Prepared on behay o J the US. Energy Research and Deuclopment Administration U N I T E D S T A T E S G O V E R N M E N T P R I N T I N G O F F I C E . W A S H I N G T O N : 1978 UNITED STATES DEPARTMENT OF THE INTERIOR CECIL D. ANDRUS. sectwary GEOLOGICAL SURVEY V. E. McKelvey. Direcror Library of Conlresr Cnrriolrtn# tn Puhltcrtban Udtr Ct*aaasn. Wnnr C. WydrOlo~nC procesbes and radionucl~dc distributnon in a cavity and chnmncv praduccd by rna Cannukin nuslssr ~ n n l u r r u n . h m c n n u r islrnd. AI;n*U*. (Hydrolory o f nuclssr tcat ritsal (Caoloyicsl Survey Profeuionai P

162

TITLE  

Office of Legacy Management (LM)

1 ~ 1 ~ ~ l l R R l l l l l l l i l ~ l ~ I R u 0 0 0 0 ~ f A Class 111 Cultural Resources Survey of the U. S. Department of Energy Rullson Gas Stimulation Test S f e Garfield County, Colorado December 1993 IT be?: tlX'i;j PBBRARII Environmental Restoration 1 A Class Ill Cultural Resources Survey of the U. S. Department of Energy Rulison Gas Stimulation Test Site Garfield County, Co torado December 1 993 Environmental Restoration A Class Ill Cultural Resources Survey of the U . S . Department of Energy Rulison Gas Stimulation Test Site Garfield County, Colorado Prepared for: W E Nevada Operations Office Las Vegas, Nevada 89193-8518 Prepared by: I T Corporation 4330 S. Valley View Blvd. Las Vegas, Nevada 89103 Work Performed under Contract No.: DE-AC08-92NV 10972 December 1993

163

Title  

U.S. Energy Information Administration (EIA) Indexed Site

Unlocking Energy Efficiency Unlocking Energy Efficiency in the U.S. Economy 2010 Energy Conference EIA, SAIS April 7, 2010 McKinsey & Company | 1 Carbon emissions Gigatons CO 2 e * End-use consumption Quadrillion BTUs * Includes carbon emission abatement potential from CHP Source: EIA AEO 2008, McKinsey analysis Significant energy efficiency potential exists in the U.S. economy Industrial Residential Commercial -9.1 Baseline 2020 Baseline case, 2008 30.8 36.9 39.9 NPV- positive case, 2020 3.2 NPV- positive case, 2020 Baseline 2020 4.3 Baseline case, 2008 3.9 -26% Savings -23% -18% -29% -28% McKinsey & Company | 2 Source: EIA AEO 2008, McKinsey analysis Primary energy End-use energy Electricity CHP Gas Oil Other Carbon emissions 100%= 9.1 quadrillion BTUs 1,080 TWh 2.9 TCF 250 MBOE Significant efficiency potential across fuel types Contribution by energy source to 2020 efficiency potential

164

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Jamie Brown Jamie Brown Director, Earth & Mineral Sciences Division EPAct Complementary Program Update January 25, 2008 Office of Research and Development Introduction NETL's EPAct 999 Complementary R&D Program * Overview of the 4 research areas: - Drilling Under Extreme Conditions (DUEC) - improve the economic viability of drilling for and producing from domestic deep (>15, 000ft) and ultra-deep (>25,000ft)O&G resources. - Environmental Impacts of O&G (EI) - provide unbiased scientific information and analysis of the environmental impacts of O&G, and develop new technology to effectively deal with any negative environmental impacts - Enhanced and Unconventional Oil Recovery (EUOR) - develop advanced technologies that will move the status of known but recoverable oil resources to

165

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oil & Natural Gas R&D Oil & Natural Gas R&D National Energy Technology Laboratory Office of Fossil Energy 2008 Annual Plan (Draft) EPACT 2005, Subtitle J, Section999 John R. Duda, Deputy Director Strategic Center for Natural Gas & Oil January 30, 2008 Strategic Center for Natural Gas and Oil 2008 Annual Plan (Draft) Development * RPSEA submitted Draft Annual Plan - November 14, 2007 - Modifications to 2007 plan * NETL developed the 2008 Annual Plan (Draft) - Federal Advisory Committees' recommendations - Program status and requirements - Complementary research plan * Submitted to HQ - December 11, 2007 - Incorporated comments from FE, et al * Sent to Federal Advisory Committees - January 9, 2008 Strategic Center for Natural Gas and Oil 2008 Annual Plan (Draft) General * "Ongoing activities"

166

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Upcoming DOE's Upcoming 2012 Congestion Study Keith White California Public Utilities Commission December 15, 2011 2 General Comments ◊ California has been fully participating in west-wide "economic" transmission studies (TEPPC since 2006, recently with much-appreciated ARRA funding) ◊ The 2005 Energy Policy Act gives DOE unclear scope regarding "congestion," and a requirement to consult with states. The following are essential: * Clearly address the specific rationale for transmission: reliability, economic efficiency, resource priorities; * If considering potential future congestion* contingent on certain conditions, fully consider the likelihood of those conditions and the consistency with state energy policies and actual market developments.

167

TITLE  

NLE Websites -- All DOE Office Websites (Extended Search)

CNT OW048 CNT OW048 Review of Environmentally Sensitive Resources at Off-Site Locations Nevada Test Site Nevada ~nvironmental Restoration Review of Environmentally Sensitive Resources at Off-Site Locations Prepared for: U.S. Deparuncnt of Energy Nevada Field Office Las Vcgas, Nevada R e p d by: l T Corporation Las Vcgas, Nevada Work Pcrformcd Under Conmct DE-AC08-92NV10972 March, 1993 Table of Contents 1.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.1 Hazardous. Contaminated. or Polluted Sites . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 1.2 Environmentally Sensitive Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 1.2.1 Property of Historic. Archaeological. or Archirectural Significance . . . . . . 1-3 1 2 . 2 Threatened. Endangered. or Candidate Species .

168

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

James Bennett National Energy Technology Laboratory - USDOE E-Mail: james.bennett@netl.doe.gov Phone: 541-967-5983 Research Efforts at NETL to Improve Gasifier Performance GTC 2013, Colorado Springs, CO - Oct 13-16, 2013 CSC Fouling Refractory/TC Wear RSC Fouling Syngas Cleanup OUTLINE - Research Objectives - Program Overview - Materials Research Focus (Refractories) * Scope of work * Impact to date * Long range goals - Industrial Involvement - Summary/Disclaimer 3 Advanced Gasification Spalling Corrosion Goals: increase gasifier efficiency, reduce capital and operational costs, reduce cost of electricity, develop predictive gasifier models, meet/exceed EPA emission targets, and increase carbon feedstock flexibility (including U.S. low rank coals)

169

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractors Contractors July 2010 Reporting Period 1 Outline of Presentation * Basic Background on Recovery Act * OMB Reporting Requirements * Timeline * Jobs Guidance * FederalReporting.gov * Available Resources * Detailed Review of Reporting Template and Field by Field Guidance 2 Overview On February 17, 2009, President Obama signed the American Recovery and Reinvestment Act, along with an Executive Order establishing the Economic Recovery Advisory Board

170

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unconventional Resources Unconventional Resources Technology Advisory Committee Recommendations - 2007 Annual Plan Brad Tomer, Director Strategic Center for Natural Gas & Oil January 29, 2008 Strategic Center for Natural Gas and Oil Federal Advisory Committee Recommendations for 2007 Draft Plan * All recommendations were accepted - Incorporated into the final 2007 Annual Plan - Addressed in an otherwise appropriate manner * This review is designed to briefly re-state summarized recommendations and DOE's response. Detailed discussions should be deferred until later in the day. Strategic Center for Natural Gas and Oil Unconventional Resources Technology Advisory Committee Sub-Groups * Technology Transfer * Regulations * Water and Environmental Management * Production Research Themes

171

TITLE  

Office of Legacy Management (LM)

Corporare Center Corporare Center f 5 1 Lalayerre Drive P.O. Box 350 Oak Ridge. Tennewt 3783 1.0350 Facsimile: 1 6 1 5 1 220.2 100 ~ o b No. 14501, FUSRAP Project DOE Contract NO. DE-AC05-9 10R2 194 9 Code: 7340/WBS: 135 U.S. Department of Energy Oak Ridge Field Office P . O . BOX 2001 Oak Ridge, Tennessee 37831-8723 Attention: David G. hdler, Site Manager , Former Sites Restoration Division subject: Hazard Assessment for Residual Contaminztion at the Former Associate Aircraft S i t e ' ( P 2 S ) Dear Mr. Adler: Based on sample results obtained a t A4S, uranium-238 concentrations above the site specific criteria (35 pCi/g) were found in a small sub-slab srsa in Section 1 of the former AAS building. The sample results of the location indicated radioactive contamination at a maximum concentration of 134 pci/g. T

172

TITLE  

Office of Legacy Management (LM)

, ,-- , ,-- - < , - ' a 7. *: POST OFFICE BOX 2038 1; : . - - , . MANAGED BY M h M l N M A R I E l T A E N E l G Y S I S l E H S . INC. - .-- OAK RIDGE. TENNESSEE 37831 FOR THE U.S. DEPARTMEIIT OF EWEROI April 22, 1994 Dr. W. k Williams EM-421 Trwion n: Building Department of Energy Washington, D. C 20585-0002 Dear Dr. Williams: In a letter to you dated August 18, 1993, a summary of the initial radiological survey was provided with only limited inionnation regarding mncentratiom in soil samples and radiation measurements inside the house. Since then, all of the samples from the initial survey have been analyzed and additional samples have been collected and anal- The reauits have been provided lo y o u ' d D. G. Adler informally as they became available ' I h i r letter contains all the 'as-found"

173

TITLE  

Office of Legacy Management (LM)

Nationd Laboratory Nationd Laboratory 9700 South Cass Avenue, Argonne, IUinois 60439 DERIVATION OF GUIDELINES FOR UaANIUbi RESIDUAL &ADIOACTIVE MATERIAL M 801L AT THE FORMER - U T E AIRCRAFT TOOL AND m A C l ' U I U N C COMPANY SlTE, FAIRFIELD, OHIO E.R. Faillace, M . Nimmagadda, and C . Yu Environmental Assessment Division January 1995 work sponsonxl by U.S. Department of Energy OMice of Environmental Restoration Washington, D.C. CONTENTS NOTATION ......................................................... v ............................... 1 1NTRODU.CTION AND BRIEF HISTORY 3 ...................................... 1.1 Site Description and Setting 3 .................................................. 1.2 SiteHistory 4 1.3 Derivation of Cleanup Guidelines .................................. 6

174

TITLE  

Office of Legacy Management (LM)

FORCE CONTROL INDUSTRIES,'INC. 1 FORCE CONTROL INDUSTRIES,'INC. 1 2 3 0 7 2 CONTROL %60 Dixie Hwy.. Zip 45014 P.O. Box l a . Z p 45018 11W b l e . Sule F Failfield. Ohio T w M i g a n a8083 Phone: (513) 868-0900 Phone: !B10) 52441= FAX. (513) 868-2105 F . U i81C.l 52d-1208 C,ir Shear Clutch & Brake Systems November 10.1994 U. S. Deparbnent of Energy Oak Ridge Operations office Ann: AD-424, Katy Kates P.O. Box 2001 Oak Ridge, TN 37831 Dear Ms. Kates, In furtherance of the August 24,1994 letter from Doug Shook, his subsequent conversation with our legal counsel, Timothy A. Gamy, follow-up with Steve Priest, and your letter of November 4,1994, the modifications you have proposed to the real estate license are acceptabte to us. As you suggested, we have made the changes to the real estate license heretofore submitted to us, and we have enclosed three copies of

175

TITLE  

NLE Websites -- All DOE Office Websites (Extended Search)

Individuals Individuals Step by Step Instructions - Page 1 of 4 Helpful Information STEP 1. Log in to the EH&S Job Hazards Analysis (JHA) system at https://ehswprod.lbl.gov/ehstraining/jha/login.aspx Use your LDAP username and Password to log in to the system. You may log in without an LDAP if you know that you have not been given one yet. Contact the Help Desk (486-4357) for assistance. Note: You will not be able to complete the process until you have a valid LDAP username and password STEP 2. To begin, select JHA New JHA from the Main Menu If you have already begun your JHA process, you can select to Modify or View from the JHA Main Menu item as well. Step by Step Instructions - Page 2 of 4 Helpful Information STEP 3. Begin the Questionnaire by selecting your work location

176

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recipients Recipients July 2010 Reporting Period 1 Outline of Presentation * Basic Background on Recovery Act * OMB Reporting Requirements * Timeline * Jobs Guidance * FederalReporting.gov * Available Resources * Detailed Review of Reporting Template and Field by Field Guidance 2 Overview On February 17, 2009, President Obama signed the American Recovery and Reinvestment Act, along with an Executive Order establishing the Economic Recovery Advisory Board

177

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractors Contractors 1 Outline of Presentation * Basic Background on Recovery Act * OMB Reporting Requirements * Timeline * Jobs Guidance * FederalReporting.gov * Available Resources * Detailed Review of Reporting Template and Field by Field Guidance 2 Overview On February 17, 2009, President Obama signed the American Recovery and Reinvestment Act, along with an Executive Order establishing the Economic Recovery Advisory Board

178

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Energy Renewable Energy eere.energy.gov 1 Clean Energy Developments in the U.S. China-U.S. Renewable Energy Forum Bobi Garrett National Renewable Energy Laboratory May 26, 2010 Office of Energy Efficiency and Renewable Energy eere.energy.gov 2 Today's Talk * U.S. Clean Energy in Context * The U.S. Recovery Act: Opportunity from Crisis * The U.S. Congress and Clean Energy: Getting to 60 * China-U.S. Collaboration on Clean Energy 2 Office of Energy Efficiency and Renewable Energy eere.energy.gov 3 Today's Talk 3 * U.S. Clean Energy in Context * The U.S. Recovery Act: Opportunity from Crisis * The U.S. Congress and Clean Energy: Getting to 60 * China-U.S. Collaboration on Clean Energy Office of Energy Efficiency and Renewable Energy eere.energy.gov 4 U.S. Energy Production and

179

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map Site Map Home Publications Software Facilities Links Staff Glazing Materials Chromogenics LowE and Spectrally Selective Deposition Processes Characterization New Materials Advanced Systems Superwindows Integrated Window Systems Gas-Filled Panels Window Properties Infrared Laboratory and Traversing System MoWiTT Window+5 Development Therm Development Film Coefficients Condensation Resistance Comfort Models Field Measurements LBNL Role in NFRC Optics Database Daylighting IEA Task 21 Lightshelves/Lightpipes Tools for Daylighting Prediction Demonstrations Daylighting Controls Residential Performance Energy Star ResFen Development ECW Demonstrations Annual Energy Rating Field Tests and Monitoring Projects

180

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recipients Recipients July, 2010 For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or go to: http://www.FederalReporting.gov 1 Outline of Presentation * Timeline * Helpful Hints for Repeat Reporters * When is FederalReporting.gov Reporting Complete? * FederalReporting.gov Features For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Pantex Finance Benchmark Results Executive Briefing Pantex Finance Benchmark Results Executive Briefing © 2009 The Hackett Group, Inc. All rights reserved. Reproduction of this document or any portion thereof without prior written consent is prohibited. Table of Contents  Benchmark Background  Company Baseline  Executive Summary  Performance Driver Analysis  Recommendations & Next Steps  Appendix Page 3 NNSA - Pantex Finance Benchmark Results Executive Briefing © 2009 The Hackett Group, Inc. All rights reserved. Reproduction of this document or any portion thereof without prior written consent is prohibited. Benchmark Results Should be Evaluated in Conjunction With the Specific Requirements of Pantex's Industry What this benchmark is . . . What this benchmark is not . . .

182

TITLE  

Office of Legacy Management (LM)

p p a * T A olistii. ..ow ... Unlted States awernment 00))#~Tmsnt of Energy - - memorandum D*=APR 0 2 1987 muym NE-23 A m OR W C I : Revised Guidelines f o r Resldual R a d ~ o a c t i v e M a t e r i a l a t N S R A P and R e m t e SRIP S l t e s Ahrends, OR Kluk, OP-124 Nelson, WSSPd Schrelber , SSDPD Welty, EH-23 G I l b e r t , MIL Berven, ORHL Berger, ORAL! Young, Aerospace Attached I s a revjsed copy o f thc Department's Guidelines f o r n s l d u a l r a d l o a c t f v e material. This versfon o f the doculnent has been revised t o i n c l u d e comnents from EH and t o address the h o t spot and s u p p l m n t a l . I i m l t/except{ons procedures out1 i n e d during t h e July 1906 workshop and subsequent working group meetings. EH intends t o include these guidelines i n d r a f t DOE Order 5480.x~. R a d i a t i o n P r o t e c t i o n o f t h e Publlc and

183

TITLE  

Office of Legacy Management (LM)

Survey Results Survey Results for Neigh boring Properties of the Alba Craft Site Oxford, Ohio U.S. Department of Energy Formerly Utilized Sites Remedial Action Program Index / / { i s / . . ....................................................... s. Main s t r a e t f i o w e s 3 . . (~1-008,012-014,016) : : , . W . Rose Avenue Properties ............................... .:. ........... I . . .97 (017) Linden Street Properties .................................................... 103 (010-011) Municipd Landfill h d parts of .......................................... 123 Tllpmnd. High School m p t s (018) Hr. J e f f Schroer Department of Energy Washmgton, DC 20585 S t ? i is93 Oxford Real Estate, Inc. 33 Yest Walnut S t m t Oxford, Ohto 4 5 M 6 Dear k. Schorr: W i t h theconsent of the m a r s , the U.S. Dapartrnt o

184

TITLE  

Office of Legacy Management (LM)

TO File rn w. 1 1311 300 TO File rn w. 1 1311 300 s ~ b p ~ t B&T Metals Site Scoping Trip Report mh November 22, 1995 hwr J.G. Braun 01 FUSRAP - Geotech ~ l t 4D12 f i t 241-5296 C ~ M S T O Distribution This trip report summarizes the information obtained by b t h the New York and MissourifOhio Teams during visits to the B&T Metals site. The scoping trips were - . - . performed to provide information to aid in the detailed ptanning, design, and preparation for site characterization and remedial action. The scoping trips included a site walkover, library - - - research to investigate historic Sanborn maps and newspaper articles, an interview with a retired 3&T Metals employee who was involved with the former MEDlAEC activities, coordinating with the property owner in preparation for characterization and remedial action,

185

TITLE  

Office of Legacy Management (LM)

Sensitive Species Survey Sensitive Species Survey Results for the Rulison and Rio Blanco Sites, Colorado December 1 993 & \ Environmental Restoration Sensitive Species Survey Results for the Rulison and Rio Blanco Sites, Colorado Prepared for: U.S. Department of Energy Environmentaf Restoration Division DOE Nevada Operations Office Las Vegas, Nevada 89 193-85 18 Prepared by: IT CORPORATION 4330 S. Valley View BIvd., Suite 114 Las Vegas, Nevada 89 103 Work Performed under Contract No. DE-AC08-92NV 10972 December 1993 Table of Contents . . List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . n ... List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111 List of Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv 1.0 Introduction .

186

TITLE  

Office of Legacy Management (LM)

. . . . . . . . . . . . . . . -, , / AMC 000102 ( Nevada DOE/NV--1106-REV. 1 1 Environmental Restoration Project Subsurface Completion Report for Amchitka Underground Nuclear Test Sites: Long Shot, Milrow, and Cannikin Revision No.: 1 September 2006 Approved for public release: further dissemination unlimited Environmental Restoration Project U.S. Department Of Energy National Nuclear Securlty Administration Nevada Sile OMW i - Available for public sale, in p a p from: U.S. Department of Commerce National Technical Information Service 5285 Poa Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Ernail: prdtr$@ntis.gov Online ordering: htto:/hvww.n~~.~ov/ordenn~.htm Available electronically at htt~://www.osti.rov/hrid~e Available for a processing fee to U.S. Department of Energy and its contractors,

187

TITLE  

Office of Legacy Management (LM)

AMCHITKA BIOLOGICAL IWODlATION S AMCHITKA BIOLOGICAL IWODlATION S J M U I i Y Prspard for tho U. S. Atoric En~rny C d a a i o n undmr Contract No. A T (26-11-171 MTTkUE Colrubua LaboratoriRa 505 Kirq A V ~ R Collubua. Ohio 43201 Printed i n t h e U n i t d S t a t ~ of A l r r i w . A v a i h b l e f t o l - Nrtio-1 Technical I n f o r m t i o n Servic* U. S. D e p a r t u n t o f C o W t E P Sprinlf i a l d , v i + # i n b 22151 Thim r e p o r t naa p r e m r d a m an account of w x k mpon~ored by t h e United S t r t a a Goverrmmnt. Neithnr t h e Unltad S t a t e s nor the United Statem Atomic Energy Caminisaion, nor any of t h e i r employeem, nor any of t h e i r contractor#, subcontrac- t o r # , o r t h e i r eaployeea, makes any varranty, -press or implied, o r assumem any legal l i a b i l i t y o r r e s p o n s i b i l i t y f o r t h e accuracy. completsnnsn or usefulness of any infor- mation apparatus, product or precesa disclosed, or r

188

TITLE  

Office of Legacy Management (LM)

/ / m - 1 2 0 6 7 4 Department of Energy Oak Ridge *rations P.O. Box 2001 Oak Ridge, Tennessee 37831-8723 September 19, 1994 Hr. Saul Gleiser Ohio H i s t o r i c a l Society H i s t o r i c Preservation D i v i s i o n 1982 Yelma Avenue Columbus, Ohio 43211-2497 Dear Mr. Gleiser: ASSOCIATE AIRCRAFT SITE - NHPA (SECTION 106) DETERHINATION I n accordance w i t h Section 106 o f the National H i s t o r i c Preservation Act (NHPA), the Department o f Energy (WE) has determined t h a t the proposed removal o f r a d i o l o g i c a l contamination a t the former Associate A i r c r a f t s i t e located a t 3660 D i x i e Highway, F a i r f i e l d , Ohio, w i l l have no e f f e c t on properties included, o r e l i g i b l e f o r inclusion, on the National Register o f H i s t o r i c Places. A description o f proposed s i t e a c t i v i t i e s i s enclosed, along w

189

TITLE  

Office of Legacy Management (LM)

Certificafion Docket for the Certificafion Docket for the Remedial Action Performed af the Associate Aircraft Site, Fairfield, Ohio, 1994- 7 995 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office October 7 996 @ Prnleo m recynmrec)c*ahe paper CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE ASSOCIATE AIRCRAFT SITE, FAIRFIELO, OHIO, 1994-1995 OCTOBER 1996 Prepared for UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Oftice Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS page FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

190

TITLE  

Office of Legacy Management (LM)

10 G 10 G . Drexel/ M. Poligone F i l e no. 7315/124 s b j e c t Determination of Additional D o t e Contaminated Areas at AAS March 17, 1994 Copies to J. Allison G. Palau K. Thompson A. John At Oak Ridge Ext. 6-5173 The purpose of this memorandum is t o provide results from characterization activities at the Former Associated Aircraft Site (AAS) in Fairfield, Ohio. Additional areas of contamination requiring remediation were identified during these activities. Areas that are currently known to exhibit elevated readings, and were not in the original scope of work are shown in Figure 3. To summarize, the areas added are located in the following areas; North of Zone V in the bathroom area (north of the locker room) and the office (located north of the caged area)

191

TITLE  

Office of Legacy Management (LM)

CULTURAL RESOURCES STUDY CULTURAL RESOURCES STUDY BACKQROUND RESEARCH REPORT Off-NfS Cukural Rasowcmr Studks: Background Research for Project Shot11 Prepared by Maureen King Alvin R. McLane and William Gray Johnson MAY 1993 DESERT RESEARCH INSTITUTE CULTURAL RESOURCES STUDY BACKGROUND RESEARCH REPORT Off-NTS Cultural Resources Studies: Background Research for Project Shoal Prepared by Maureen King Alvin R. McLane and William Gray Johnson Prepared for the U.S. Department of Energy Nevada Field Office Las Vegas, Nevada This document is UNCLASSIFIED Derivative , , ::/>.: ; , . / I : Classifier - & ? " A . + - = / . /.. Desert Research Institute ate.:^^:,'& MAY 1993 The work upon which this report is based was supporred by the U.S. Department of h e r g y under Contract #DE-AC08-90NV10845

192

TITLE  

Office of Legacy Management (LM)

OEce of Radiation and OEce of Radiation and 12nvirorunentai Protection Indoor Ailr Washington., DC 20460 Annual Water Sampling and Analysis, Calendar Year 2000: R'ULISON Tes,t Site Area RLO BLANCO Test Site Area FAULTLESS Tes it Site Area SHOAL Test Site Area GASBUGGY Test Site, Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 2000 RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area GASBUGGY Test Site Area GNOME Test Site Area by Max G. Davis Prepared for the U.S. Department of Energy under Interagency Agreement DE-AI08-96NV11969 UDIATION AND INDOOR ENVIRONMENTS NATIONAL LABORATORY OFFICE OF RADIATION AND INDOOR AIR U.S. ENVIRONMENTAL PROTECTION AGENCY P.O. BOX 98517 LAS VEGAS, NV 89193-8517 NOTICE

193

TITLE  

Office of Legacy Management (LM)

~overnment ~overnment Department of Energy Oak Ridge Operations Office memorandum DATE: January 19. 1995 SUBIECT: USE OF EXEHPTIOW FROW DEPhRTnEKl OF ENERGY ORDER 5820.2A F O R RADIOhCTIVE WASTE FROn FUSlUl To: James A. Turi , Director, O f f i c e o f Program Support, O f f i c e o f the Deputy Assistant Secretary Waste Clanagelent, M-33, TREY I I This m r a n d u n serves t o n o t i f y 01-33 o f the F o m r l y U t i l i z e d Sites Remedial Action Program's (FUSRAP] i n t e n t t s dispose o f radioactive waste a t a cormercial disposal f a c i l i t y . I n compl iance w i t h the authorization (1. P. G r d l y t o Managers WE Operations Offices dated 10/12/93), the following information i s being provided p r i o r t o comnencement o f the Associate A i r c r a f t , F a i r f i e l d , Ohio, waste stream 2027-01. Waste type: S o i l , vacuum b

194

TITLE  

Office of Legacy Management (LM)

, . . - . . t e d Copj UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Faderal Center, Llcewood, Colorado 80225 BATHYMETRY OF CANNIKIN LAKE, AnCRITU ISLAND. ALASKA, WITH AN EVALUATION OF COMPUTER MAPPING TECHNIQUES Don Digeo GonerLee, Leonard E. Wollltz, and G. E . Brerhauer CONTENTS Page A b s t r a c t . . . . . . . . . . . . . . . . . .. . . . . . . , . . . . . 1 I n t r o d u c t i o n . . . . . . . . . . . . . , . . . . . . . . . . . . . . 1 Acknowl.edgments . . . . . . . . . . . . . . . . . . . . . . . 5 Geologic and hydrologic s e t t i n g . . . . . . . . . - . . . . . . . . 5 Effects of Cannikin . . . . . . . . . . . . . . . . . . . . . . . 6. Bathymetry . . . . . . . . . . . . . . . . . . . . . . 8 Computerlnepping techniques . . . . . . . . . . . + . . . . . , . . 9 Comparison o f computer-mapping techniques . . . . . . . . . . . . .

195

TITLE  

Office of Legacy Management (LM)

Ill lllIlllllllllllllllllllllllIII1 Ill lllIlllllllllllllllllllllllIII1 SHL 000035 Letter Report Contaminant Boundary at the Shoal Underground Nuclear Test prepared by Greg Pohll and Karl Pohlmann Division of Hydrologic Sciences Desert Research Institute University and Community College System of Nevada submitted to Nevada Sitc O f i c e National Nuclear Security Administration U.S. Deparuncnt of Enagy Las Vegas, Nevada August 6,2004 The work upon which this report is based was suppomd by the U.S. Department of Energy under Contract #DE-AC52-OONVI3609; intended for limited distribution. Reference herein to any specific commercial product, process, or service by trade name, trademark, n~anuC;lcturcr, or otherwise, does not necussuily constitute or imply its endorsement, recommendation, 01. favoring by the Unitcd States Govcmmcnl or any agcncy thereof ur its

196

TITLE  

Office of Legacy Management (LM)

~ ~ ~erivation of ~uidelines for Uranium Residual Radioactive Material in soil at the B&T Metals Company Site, Columbus,. Ohio Environmental Assessment Division f i Argonne National Laborgory Operated by The Unlvenlty of ChCago. under Contract w-31-109-Eng-38, lor tne United States Department of Energy Derivation of Guidelines for Uranium Residual Radioactive Material in Soil at the B&T Metals Company Site, Columbus, Ohio by S. Kamboj. M. Nimmagadda, and C. Yu Env~ronmental Assessment Division. Argonne National Laboratory, 9700 South Cass Avenue. Argonne. Illinois 60439 January 1996 Work sponsored by U.S. Depanment of Energy. Office of Environmental Restoration, Washington, D.C. ; CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

197

TITLE  

Office of Legacy Management (LM)

2 Velma Avenue 2 Velma Avenue Columbus, 0h.o 4321 1-2497 6141297-2300 Fax: 297-241 1 OH I 0 HISTORICAL SOCIETY SlSCE 1885 February 23, 1996 David G. Adler, Site Manager F o m r Sites Restoration Division Department of Energy Oak Ridge Operations Office P.O. 80x 200T Oak Ridge, Tennessee 37831 -8723 Dear Mr. Adler: Re: 8 8 T Metal Building, Columbus, Ohio This is in response to your correspondence, received on February 22, 1996, regarding the project noted above. My staff has reviewed carefully the information provided. Based on the description of the proposed work and photographs provided, it is my opinion that the proposed work, if completed as proposed, will have no effect on the integrity of the B 8 T Metal building, which is eligible for the National Register of Historic Places under Criterion C. No further coordination with

198

TITLE  

Office of Legacy Management (LM)

902 902 GEN-BKS - - - . I 111 111 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 l l Ill SHL 000024 United States Office of Radiation and EPA-402-R-94-001 Environmental Protection Indoor Air January 2004 Agency Washington, DC 20460 Annual Water Sampling and Analysis, Calendar Year 2003: SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RI0 BLANCO Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 2003 SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RIO BLANCO Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Max G. Davis Terry L. Mouck Prepared for the U. S. Department of Energy under Interagency Agreement DE-,4108-96NV11969 RADIATION AND INDOOR ENVIRONMENTS NATIONAL LABORATORY

199

TITLE  

Office of Legacy Management (LM)

POST-REMEDIAL ACTION REPORT POST-REMEDIAL ACTION REPORT FOR THE ASSOCIATE AIRCRAJT SITE Fairfield, Ohio Bechtel National, Inc. POST-REMEDIAL ACTION REPORT FOR THE ASSOCIATE AIRCRAFT SITE FAIRFIELD. OHIO JULY 1996 Prepared for United States Depariment o f Energy Oak Ridge Operations Off= Under Contract No. DE-AC05-910R2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1 . 1 BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 HISTORY . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . 3 2.0 REMEDIAL ACTION GUIDELINES .

200

TITLE  

Office of Legacy Management (LM)

Bechtel Bechtel Inferoffice Memorandum TO G. L. Palau Subject Scoping Notice:' Former Associate Aircraft Tool and Manufacturing., Inc . Site, Fairf ield, Ohio copies to T. E. Morris G. R. Gale W & J. S. Allison File No. 7440/124 Date November 1, 1994 Frcm D. D. Sexton MS of ES &H ~t Oak Ridge ~ x t . 4-3643 SCOPING NOTICE INTRODUCTION The purpose of this scoping notice is to formalize the identification and application of federal and state rules and regulations that may apply to the cleanup of the Former Associate Aircraft Tool and Manufacturing Site at 3660 Dixie Highway (hereinafter referred to as the Fairfield Site), in Fairfield, Ohio. This environmental compliance evaluation is based on information contained in the Radiological Survey of the site which provides the nature and extent

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

TITLE  

Office of Legacy Management (LM)

T T O G. L. Palau Subject Scoping Notice: The B&T Metals Site, Columbus, Ohio F i l s No. 744011 13 ~ a t t February 26, 1996 F P m l D. D. Sexton b of Environmental Compliance EX^. Oak Ridge ~t 4-3643 BACKGROUND The purpose of this Scoping Notice is to formalize the identification and evaluate the application of federal and state rulcs and regulations that apply to the cleanup of the B&T Metals site, located in Columbus, Ohio. This environmental compliance evaluation is based on information contained in the Designation Summary of the site (CCN 095792), which provides the nature and extent of radiological contamination, and upon an Engineering and Technology preliminary draft characterization report which identifies the presence and type of chemical and radioactive mixed waste present at the site.

202

TITLE  

Office of Legacy Management (LM)

Floodplains and Wetlands Floodplains and Wetlands Survey Results for the Rulison and Rio Blanco Sites, Colorado December 1 993 Environmental Restoration Floodplains and Wetlands Survey Results tor the Rulison and Rio Blanco Sites, Colorado Prepared For: U.S. Department of Energy Environmental Restoration Division DOE Nevada Operations Office Las Vegas, Nevada 89 193-85 18 Prepared By: l T CORPORATION 4330 S. Valley View Blvd., Suite 114 Las Vegas, Nevada 89 103 Work Performed under Contract No: DE-AC08-92NV 10972 December 1993 Table of Contents . . List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii List of Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv

203

Title  

Gasoline and Diesel Fuel Update (EIA)

External Developments Division External Developments Division Do financial investors destabilize oil prices? The opinions expressed here are personal and not necessarily shared by the ECB or the Eurosystem Energy Information Administration 24 August 2011 by Marco J. Lombardi and Ine van Robays European Central Bank and Ghent Univeristy 2 Motivation * Oil price surged with increasing momentum between 2003-2008 before falling in the wake of the financial crisis and the subsequent economic downturn. After that, prices recovered again. * Oil price increases came against the background of surging demand and stagnating supply. 0 20 40 60 80 100 120 140 2000M01 2001M01 2002M01 2003M01 2004M01 2005M01 2006M01 2007M01 2008M01 2009M01 2010M01 spot oil price in USD/barrel 3 Financialization of oil * The financialization

204

title  

NLE Websites -- All DOE Office Websites (Extended Search)

April 21, 2003 April 21, 2003 April 21, 2003 Bakul Banerjee Bakul Banerjee Project Engineer Project Engineer MOU/SOW MOU/SOW NEU MOU and FY03 SOW are waiting for Mont's signature. SOW NEU MOU and FY03 SOW are waiting for Mont's signature. SOW contains work for three engineers. contains work for three engineers. Princeton FY03 SOW and Caltech FY03 SOW were signed in March. Princeton FY03 SOW and Caltech FY03 SOW were signed in March. Caltech FY03 SOW and MOU will be modified to include T2 Caltech FY03 SOW and MOU will be modified to include T2 operations work after UCSD and UFL MOUs are approved. operations work after UCSD and UFL MOUs are approved. UCDavis UCDavis FY03SOW was signed by Dr. Ko and waiting for FY03SOW was signed by Dr. Ko and waiting for Bauerdick

205

TITLE  

NLE Websites -- All DOE Office Websites (Extended Search)

Watec Resources Canter Watec Resources Canter 1 I EVALUATION OF GROUNDWATER FLOW AND TRANSPORT AT THE FAULTLESS UNDERGROUND NUCLEAR TEST, CENTRAL NEVADA TEST AREA I prepared by I Karl P o h l m a ~ , Jenny Chapman, Ahmed Hassan, and Charalambos Papelis ! submitted to Nevada Operations M c e U.S. Department of Energy SEPTEMBER 1999 Publication No. 45165 @ C F J C This report uas prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any o f their contractors, subaontractors or their employees, makes any warranty, express M implied, or assumes any It@ Liability or responsibility for the accuracy, oompletenesr, or any third party's use or the results of such use of m

206

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recipients Recipients 1 Outline of Presentation * Basic Background on Recovery Act * OMB Reporting Requirements * Timeline * Jobs Guidance * FederalReporting.gov * Available Resources * Detailed Review of Reporting Template and Field by Field Guidance 2 Overview On February 17, 2009, President Obama signed the American Recovery and Reinvestment Act, along with an Executive Order establishing the Economic Recovery Advisory Board

207

TITLE  

Office of Legacy Management (LM)

. . . . . . . 7 AEC ANL ARC BNI W E ERDA FUSRAP HED cm dpm f t g in. m mrem pci Atomic Energy Commission Argonne National Laboratory Albany Research Center Bechtel National, Inc....

208

TITLE  

Office of Legacy Management (LM)

TO Distribution Subject EIN: Ohio Hazardous Waste Regulations Copier t o G. R. Galen G. L. Palau F i l e No. 7440124, 135 ate January 10, 1995 Frm D. D. Sexton TDS of ES&H t Oak...

209

TITLE  

Office of Legacy Management (LM)

point (CP), and the h e l i c o p t e r pad were located on lands within the Carson National Forest. The use of these lands f o r the Gasbuggy P r o j e c t was established i...

210

Title:  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemical Society (2008), 130(4), 1507-1516 Tsapatsis, Michael; Maheshwari, Sudeep; Bates, Frank S.; Koros, William J. Layered zeolite materials and methods related thereto....

211

TITLE  

Office of Legacy Management (LM)

Cwmr . lwlales lha mntamhwna from the envlronmant by m d n p a m U layer war the drllng mud p h . . Reducss fulurm mbratbn by diidlng surlsca water hom the drMing mrvl MI....

212

TITLE  

Office of Legacy Management (LM)

TAKE- s - United States Department of' h e Interior - - FISH AND WII.,DLIFE SEKWC:E am I I 4600 Kiotrk. Lam, Building C-125 -no, e v a d a 89502-5093 SHL 000036 January 13,...

213

TITLE  

Office of Legacy Management (LM)

Primary cosmic radiation consists of '*g&lactic1' particles externally incident on the solar system, and "solar" particles emitted by the sun. This radiation is corposed primarily...

214

TITLE  

NLE Websites -- All DOE Office Websites (Extended Search)

button next to each profile. STEP 4. Reviews the Worker's JHA and click the Make Changes Button next to each Group or Individual section to update that section. Only the Work...

215

TITLE  

Office of Legacy Management (LM)

ELEV: 7000 ft LAT: 37 54' 00" N LONG: 109 18' 00" w TEMPERATURE (OF)' RAIN (in), WIND SPEED (mph) HEAT COOL AVG MEAN DEG DEG WIND DOM DAY TEMP HIGH TTME LOW TIME DAYS DAYS...

216

Title  

National Nuclear Security Administration (NNSA)

initiation of explosives occurs by two different mechanisms-either hot spotbased or thermal explosion-based-depending on microstructure. Studies on a large number of explosive...

217

TITLE  

Office of Legacy Management (LM)

Departmentaof n e r Washington, DC 20585 IdkY O 3 1993 Mr. James Besl President Force Control Industries 3660 D i x i e Hrghway F a i r f i e l d , Ohio 45014 Dear M r . Besl...

218

TITLE  

Office of Legacy Management (LM)

Colorado History Co-sponsored by the U.S. Atomic Energy Commission (AEC) and Austral Oil Company under the Plowshare Program, Project RULISON was designed to stimulate natural...

219

Title  

Annual Energy Outlook 2012 (EIA)

External Developments Division Do financial investors destabilize oil prices? The opinions expressed here are personal and not necessarily shared by the ECB or the Eurosystem...

220

TITLE  

Office of Legacy Management (LM)

R i i e . Tennessee 37831 -8723 J u l y 18, 1995 Mr. Graham H i t c h e l l , Environmental Manager Ohio Envi r o n e n t a l Protection llgency Southwest O I s t r i c t O f f l c...

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

TITLE  

NLE Websites -- All DOE Office Websites (Extended Search)

I - DOEMr13609-27 a r n w s a r a s w n r m l l f i h l l CNT 000047 A Validation Process for the Groundwater Flow and Transport Model of the Faultless Nuclear Test...

222

TITLE  

Office of Legacy Management (LM)

1057 WEST FIREWEED LANE. ANCHORAGE. ALASKA 99603. TEL. 1 9 0 1 1 ZS7-5m(l hmmm& S p a d k r s n the Enmonmsm 7 " C W -I Section ... 2 SITE...

223

TITLE  

Office of Legacy Management (LM)

FORMERLY UTILIZED SITES REHEDIAL ACTION PROSRAN IW DECOHTMIHATI OH AND DE?OWISSIONING P R O G M (Revision 3, Nowember, 1930) I L - I This p r o t o c o l o u t l i n e s the...

224

TITLE  

Office of Legacy Management (LM)

Ohio TO: The F i l e The attached review documents the basis f o r determining whether DOE has a u t h o r i t y f o r t a k i n g remedial a c t i o n a t the BaT Metals f a c i...

225

TITLE  

Office of Legacy Management (LM)

O Distribution pile 10. 7 4 4 0 1 2 4 , 135 s & ; t EIN: Ohio azardous D I C February 6 . 1995 Waste Regulat ions; Empty Container Rule r - D . D. Sexton C-ics lo T. E....

226

TITLE  

Office of Legacy Management (LM)

pub1 i c meetings on the nature o f cleanup measures, waste. management, and waste transportation routes, i n t e r v i e w s and discussions w i t h ARC employees and management,...

227

TITLE  

Office of Legacy Management (LM)

that the Albany rite was contaminated above current pufdelines. An aerial radiological survey conducted In Februuy 1980 did not indicate the presence of ndfoactive contamination i...

228

TITLE  

Office of Legacy Management (LM)

of buildings in the northern and central portions of the site; a 0.8-ha (2-acre) biomass research facility (inactive) located south of the site's approximate center; and a...

229

TITLE  

Office of Legacy Management (LM)

Survev of the Albany etallurgical Research Center United States Bureau of Wines Biomass Facility and the "Back Forty" Area, Albany, Oregon. DOEEV-000539. June 1983. 4 ....

230

TITLE  

Office of Legacy Management (LM)

in the northern and central sections of the site; an inactive 0.8-ha (2-acre) biomass research facility located at the site's approximate center; and a 5.7-ha (14-acre)...

231

TITLE  

Office of Legacy Management (LM)

site consists of three main areas: ARC proper, the main research facility; the former Biomass Research Facility which consists of approximately O.&ha (2-acre), located wuth of the...

232

TITLE  

Office of Legacy Management (LM)

of buildings in the northern and central sections of the site: a 0.8-ha (2-acre) biomass research facility (inactive) located at the site's approximate center; and a 5 . 7 -...

233

TITLE  

Office of Legacy Management (LM)

and central portions of the site; a 0.8-ha (2-acre) area that once contained a biomass research facility (decommissioned) in the southern portion: and an open area...

234

TITLE  

Office of Legacy Management (LM)

e r n m o s t 29 a c r e s of t h e p r o p e r t y : a 2 - a c r e , i n a c t i v e BioMass R e s e a r c h F a c i l i t y , l o c a t e d n e a r t h e c e n t e r of t h e p...

235

TITLE  

Office of Legacy Management (LM)

of buildings in the northernmost 12 ha (29 acres) of the site: the .8-ha (2-acre) Biomass Research Facility FIGURE 1-1 PLAN VIEW OF THE ALBANY RESEARCH CENTER FUSRAP 14501...

236

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Path) ARPA-E is currently running four FOAs - three focused and one broad 6 Vehicle Storage + Home Refueling < 2000 Methane Opportunities for Vehicular Energy (MOVE)...

237

title  

Science Conference Proceedings (OSTI)

... Terrorism, Unconventional Threats and Capabilities Subcommittee. March 24, 2009. CLO-05-002-RevV. 10. situation with DOD healthcare IT. 11. ...

2013-04-26T23:59:59.000Z

238

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

models, and set a standard process for budget and staffing development to allow some learning curve savings to take place Stop making rules without considering the needs...

239

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rail * Supercapacitor for Load & DG Integration * Flow Battery for T&D Deferral * Flywheel for Area Regulation * Outlook EESAT 2007 - Eyer - DUA 3 Scope * DOE ESS partnership...

240

Title........................  

E-Print Network (OSTI)

This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, subcontractors, or affiliated partners makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof. Available electronically at

Larry Brand; In Paper; Larry Brand

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

TITLE  

Office of Legacy Management (LM)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.1 Records Search 5-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....

242

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Committee Meeting 3232011 1:16 PM 17 Research Teams Advanced Combustion *Oxy-fuel, Co-firing *Oxy: Materials *USC: Materials *Chemical Looping *Advanced Concepts Advanced...

243

TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CITY/CO{TRIBAL): CITY/CO{TRIBAL): DATE RECEIVED: BRIEF DESCRIPTION: NEPA REVIEWER NEPA DECISION (CX/ EAtEIS) : NHPA ISSUES NEPA/NHPA CONDITIONS: * ENERGY Oak Ridge Office AK-TRIBE-NATIVE VILLAGE OF NELSON LAGOON CO MP LETE 800145422 STATE : AK Tribe Round Two Review: 0 2/8/2010 Energy effiCiency retrofits on the tribal council office building (insulation, vapor barriers, drywall and supplies, T111 sidmg, hardware, paint and primer, and respirators) S.G. Thornton ex CX APPLIED: CX-EEC8G -004 SUBPART D REF 82.5,85.1 None NEPA Compliance Officer (NCO) Review, including consideration of extraordinary circumstances : ~n may be categorically excluded from further NEPA review. I have determined that the proposed action meets the requirements for categorical exclusion in Subpart D, Appendix A or B.

244

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

in siting. The specific requirements are: 1. 480V-3Ph-60Hz electrical supply (75 kVA, 90A transformer) 2. Potable water 3. Instrument air: 150 psig 4. Instrument nitrogen: 150 psig...

245

Annual report to the Advisory Council on Historic Preservation and the Colorado State Historic Preservation Officer on the US Department of Energy`s cultural resource activities at Colorado UMTRA Project sites, January--December 1991  

SciTech Connect

This report is a summary of the US Department of Energy`s (DOE) cultural resource investigations for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado. This report is intended to fulfill the DOE`s obligation for an annual report as stated in the Programmatic Memorandum of Agreement executed between the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer in December 1984. Summaries of the cultural resource surveys and identified resources are provided for the UMTRA Project sites in the vicinities of Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock. This report covers all UMTRA Project cultural resource activities in Colorado from January through December 1991.

Not Available

1992-04-01T23:59:59.000Z

246

crd title p1.ai  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

II II Rail Alignment EIS - Chapter 3 U.S. Department of Energy Office of Civilian Radioactive Waste Management June 2008 Rail Alignment EIS TABLE OF CONTENTS Section Page VOLUME I CHAPTER 1. PURPOSE AND NEED FOR AGENCY ACTION CHAPTER 2. PROPOSED ACTION AND ALTERNATIVES VOLUME II CHAPTER 3. AFFECTED ENVIRONMENT 3.1 Introduction ............................................................................................................................ 3-1 3.2 Caliente Rail Alignment ......................................................................................................... 3-3 3.2.1 Physical Setting ................................................................................................................ 3-7 3.2.1.1 Region

247

Research Highlights Sorted by Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Title Title "Invisible" Giants in the Sky ARM ASR Kassianov, E. "Radiance Assimilation" Correction Method Improves Water Vapor Radiosonde Observations in the Upper Troposphere ARM Soden, B. J. "Roobik" Is Part of the Answer, Not a Puzzle ARM Turner, D. D. 2007 Floods Not a Complete Washout in U.S. Great Plains ARM ASR Bhattacharya, A. A "Little" Respect: Droplet Nucleation Finally Included in Global Climate Model ARM Ghan, S. J. A Bulk Parameterization of Giant Cloud Condensation Nuclei ARM Kogan, Y. A Climatology of Midlatitude Continental Cloud Properties and Their Impact on the Surface Radiation Budget ARM Dong, X. A Comparison of Integrated Water Vapor Sensors: WVIOP-96 ARM Liljegren, J. C. A Consistency Analysis of ARESE Aircraft Measurements ARM

248

Estimating calibration equations for predicting Ra-226 soil concentrations using RTRAK in-situ detectors at the Ambrosia Lake, New Mexico, Umtra site  

Science Conference Proceedings (OSTI)

This report describes a field study conducted at the Ambrosia Lake, New Mexico, UMTRA site to obtain data for calibrating the RTRAK Sodium Iodide (NaI) detectors for estimating concentrations of Ra-226 in surface soil. The statistical analyses indicate that the data are useful for estimating the calibration equations. Several statistical models are used to evaluate which model is best as a basis for the calibration equations. A procedure is provided for using the estimated calibration equations and extensive RTRAK measurements to estimate the average Ra-226 concentration on 100-m/sup 2/ land areas to determine whether additional remedial action is needed. The UMTRA Project office proposes to use the RTRAK for cleanup verification of surface Ra-226 contamination. The system enables 100% coverage of areas having undergone remedial action. The sensitivity of the system enables verification at less than 5 pCi/g averaged over 100 m/sup 2/, as specified by the Environmental Protection Agency (EPA) standards (40 CFR Part 192). This analysis demonstrates RTRAK's ability to meet reasonable standards of statistical accuracy, using commonly accepted procedures. 5 refs., 8 figs., 1 tab.

Gilbert, R. O.; Meyer, H. R.; Miller, M. L.; Begley, C.

1988-06-01T23:59:59.000Z

249

Annual report on the US Department of Energy`s cultural resource activities at Colorado UMTRA Project sites for October 1991--September 1992  

Science Conference Proceedings (OSTI)

This report summarizes the US Department of Energy`s (DOE) cultural resource studies that were undertaken in support of the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project in the state of Colorado for the period of October 1, 1991, through September 30, 1992. This report fulfills the DOE`s obligation to provide an annual report to the state of Colorado on the status and results of cultural resource studies conducted during the above period of record. This requirement is stated in a programmatic memorandum of agreement executed between the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer in December 1984. Previous reports were based on a calendar year reporting period. However, in order to be more consistent with the programmatic memorandum of agreement, the period of record for this and subsequent annual reports has been changed to the Federal fiscal year. The current status and summaries of 1992 cultural resource surveys are provided for all UMTRA Project sites in Colorado. The sites are Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock.

Not Available

1993-10-06T23:59:59.000Z

250

II5, Electrical Tuning of InGaN Quantum Dots in GaN Photonic ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2011 Electronic Materials Conference. Symposium, 2011 Electronic Materials Conference. Presentation Title, II5, Electrical Tuning...

251

crd title p1.ai  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I Nevada Rail Corridor SEIS Rail Alignment EIS - Chapters 1 and 2 U.S. Department of Energy Office of Civilian Radioactive Waste Management June 2008 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor (DOE/EIS-0250F-S2; the Nevada Rail Corridor SEIS), and Final Environmental Impact Statement for a Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada (DOE/EIS-0369; the Rail Alignment EIS) CONTACTS: For more information about this document, For general information on the DOE NEPA process,

252

crd title p1.ai  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SHEET SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor (DOE/EIS-0250F-S2D; the Nevada Rail Corridor SEIS), and Draft Environmental Impact Statement for a Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada (DOE/EIS-0369D; the Rail Alignment EIS) CONTACTS: For more information about this document, write or call: For general information on the DOE NEPA process, write or call: U.S. Department of Energy Office of Civilian Radioactive Waste Management

253

Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

254

Control Measure Title Reference Number *  

E-Print Network (OSTI)

exhaustive search for emissions reductions to use in meeting federal Clean Air Act requirements for this 2008 PM2.5 Plan. Chapter 6 details the Districts process for developing control measures for reducing emissions of primary PM2.5 and PM2.5 precursors. This Appendix presents the product of this process: a master list of all candidate control measure ideas identified and evaluated for this plan. After assembling Appendix I, the District then screened the candidate measures into several categories: high priority measures to be implemented in the years immediately following plan adoption; measures that might be implemented in future years to allow for expected technology development; and those measures that require further study to identify when they could be implemented and what reductions they could achieve. Candidate control measure descriptions in Appendix I have the following major components:! Title and Number

unknown authors

2008-01-01T23:59:59.000Z

255

Using EnergyPlus for California Title-24 compliance calculations  

NLE Websites -- All DOE Office Websites (Extended Search)

Using EnergyPlus for California Title-24 compliance calculations Title Using EnergyPlus for California Title-24 compliance calculations Publication Type Conference Paper LBNL...

256

Microsoft Word - S00336_Title I & II Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Nuclear Regulatory Commission, "General License for Custody and Long- Term Care of Residual Radioactive Material Disposal Sites," Code of Federal Regulations, January 1,...

257

Title I conceptual design for Pit 6 landfill closure at Lawrence Livermore National Laboratory Site 300  

Science Conference Proceedings (OSTI)

The objective of this design project is to evaluate and prepare design and construction documents for a closure cover cap for the Pit 6 Landfill located at Lawrence Livermore National Laboratory Site 300. This submittal constitutes the Title I Design (Conceptual Design) for the closure cover of the Pit 6 Landfill. A Title I Design is generally 30 percent of the design effort. Title H Design takes the design to 100 percent complete. Comments and edits to this Title I Design will be addressed in the Title II design submittal. Contents of this report are as follows: project background; design issues and engineering approach; design drawings; calculation packages; construction specifications outline; and construction quality assurance plan outline.

MacDonnell, B.A.; Obenauf, K.S. [Golder Associates, Inc., Alameda, CA (United States)

1996-08-01T23:59:59.000Z

258

POSTER DESCRIPTION: Poster Title: "Distributed Electric Power...  

NLE Websites -- All DOE Office Websites (Extended Search)

DESCRIPTION: Poster Title: "Distributed Electric Power from Bio-based and Fossil Fuels" Entity: Technology Management, Inc. 9718 Lake Shore Blvd., Cleveland, Ohio 44108 Author(s):...

259

Berkeley Lab's "Draft" Sustainability Strategy (Title TBD)  

NLE Websites -- All DOE Office Websites (Extended Search)

Berkeley Lab's "Draft" Sustainability Strategy (Title TBD) NOTICE Due to the current lapse of federal funding, Berkeley Lab websites are accessible, but may not be updated until...

260

crd title p1.ai  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IV IV Rail Alignment EIS - Chapters 5 through 8 List of Preparers Glossary Reference List U.S. Department of Energy Office of Civilian Radioactive Waste Management June 2008 Rail Alignment EIS DOE/EIS-0369 iii TABLE OF CONTENTS Section Page VOLUME I CHAPTER 1. PURPOSE AND NEED FOR AGENCY ACTION CHAPTER 2. PROPOSED ACTION AND ALTERNATIVES VOLUME II CHAPTER 3. AFFECTED ENVIRONMENT VOLUME III CHAPTER 4. ENVIRONMENTAL IMPACTS VOLUME IV CHAPTER 5. CUMULATIVE IMPACTS 5.1 Introduction ............................................................................................................................ 5-1 5.1.1 Regions of Influence ........................................................................................................ 5-1

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

crd title p1.ai  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

III III Rail Alignment EIS - Chapter 4 U.S. Department of Energy Office of Civilian Radioactive Waste Management June 2008 Rail Alignment EIS DOE/EIS-0369 iii TABLE OF CONTENTS Section Page VOLUME I CHAPTER 1. PURPOSE AND NEED FOR AGENCY ACTION CHAPTER 2. PROPOSED ACTION AND ALTERNATIVES VOLUME II CHAPTER 3. AFFECTED ENVIRONMENT VOLUME III CHAPTER 4. ENVIRONMENTAL IMPACTS 4.1 Introduction ............................................................................................................................ 4-2 4.1.1 Impacts Associated with the No-Action Alternative ....................................................... 4-2 4.1.2 Impacts Associated with the Proposed Action ................................................................. 4-3

262

G Subject: Implementation of Division B, Title III, Title V and Division C  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B, Title III, Title V and Division C B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No. 112-74 References: Consolidated Appropriations Act, 2012, Title III, Section 301(a), 301(b), 316 Pub. L. No. 112-74 Title V, Sections 501, 504, 505 Title VII, Sections 725 When is this Financial Assistance Letter (FAL) effective? The statutory provisions addressed in this FAL were effective on the enactment date of the Consolidated Appropriations Act, 2012, December 23, 2011. When does this FAL expire? This FAL remains in effect until superseded or canceled. Who is the intended audience? Department of Energy (DOE) and National Nuclear Security Administration (NNSA) Contracting Officers. Who is the point of contact?

263

Records Schedule-UMTRA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WEQh!?ST FOP. RECOhD WEQh!?ST FOP. RECOhD ' 3ISPOSITIQN AClT H O R l N - - . (See Insrru~t,ons on reverse) 'c NATIOKAL ARCMVES and RECORDS ADMINISTRATION (MR) WASHINGTON, DC 20408 I . FROM ( A g e n c y or e s t a b l ~ s h m e n t ) , U. S . Denar-merit o f Enercy 2. MAJOR SU8OlVlSiON i 51 bu~uerque $net a t i i o n s O f ?ice (kL9 j 3. MINOR SUBDIVISION Urani urn !

264

UMTRA Ground Water Project  

Office of Legacy Management (LM)

... 7 Figure 3. Uranium Distribution from April 2013 Sampling at the Gunnison, Colorado, Processing Site...

265

Wilton Wind Energy Center II II | Open Energy Information  

Open Energy Info (EERE)

Wilton Wind Energy Center II II Wilton Wind Energy Center II II Facility Wilton Wind Energy Center II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser Basin Electric Location Burleigh County ND Coordinates 47.142638°, -100.730567° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.142638,"lon":-100.730567,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

266

Equal Employment Opportunity -Title VII | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Equal Employment Opportunity -Title VII Equal Employment Opportunity -Title VII Diversity and Inclusion Supporting Small Businesses Minority Economic Impact Partnering with...

267

Texas Administrative Code TITLE 19 EDUCATION  

E-Print Network (OSTI)

Rules Texas Administrative Code TITLE 19 EDUCATION PART 1 TEXAS HIGHER EDUCATION COORDINATING BOARD IN TEXAS SUBCHAPTER C APPROVAL OF NEW ACADEMIC PROGRAMS AND ADMINISTRATIVE CHANGES AT PUBLIC UNIVERSITIES of Approval for New Doctoral Degree Programs Page 1 of 1: Texas Administrative Code 7/18/2011http://info.sos

Wood, James B.

268

TITLE XIIISMART GRID SEC. 1305. SMART GRID ...  

Science Conference Proceedings (OSTI)

Page 1. TITLE XIIISMART GRID SEC. 1305. SMART GRID INTEROPERABILITY FRAMEWORK. (a) INTEROPERABILITY ...

2013-05-16T23:59:59.000Z

269

Toxic and hazardous chemicals, Title III and communities: An outreach manual for community groups  

SciTech Connect

The manual was prepared for State and local government officials, local emergency planning committee (LEPCs), and other community groups that want to make Title III work. It is intended as a practical guide for those who have little or no previous experience in the field of communication, whose time must be snatched from home and office, and whose resources are limited. The manual has three major sections: Part I discusses planning, which is vital to the success of a communication program; Part II suggests ways to get and keep people involved, especially important because Title III affects so many different sectors of the community; Part III, a how-to-do-it section, talks about specific tasks, such as giving a speech or writing a press release. Appendices include a detailed explanation of the law, a glossary, a list of recent studies related to Title III communications, a list of educational materials, and a list of State contacts.

McNeil, C.; Arkin, E.B.; McCallum, D.

1989-09-01T23:59:59.000Z

270

Cimarron II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Cimarron II Facility Cimarron II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Duke Energy Developer CPV Renewable Energy Energy Purchaser Kansas City Power & Light Location Cimarron KS Coordinates 37.90154236°, -100.3934097° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.90154236,"lon":-100.3934097,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

271

Limon II | Open Energy Information  

Open Energy Info (EERE)

Limon II Limon II Jump to: navigation, search Name Limon II Facility Limon II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser Xcel Energy Location Limon CO Coordinates 39.33323523°, -103.5521507° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.33323523,"lon":-103.5521507,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

272

Penascal II | Open Energy Information  

Open Energy Info (EERE)

Penascal II Penascal II Jump to: navigation, search Name Penascal II Facility Penascal II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Developer Iberdrola Renewables Location Kenedy County TX Coordinates 27.003108°, -97.584014° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":27.003108,"lon":-97.584014,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

273

Aegir II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Aegir II Facility Aegir II Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Location Lake Michigan MI Coordinates 43.098°, -86.597° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.098,"lon":-86.597,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

274

Title Page Applied and Environmental Microbiology 1  

NLE Websites -- All DOE Office Websites (Extended Search)

Applied and Environmental Microbiology 1 Applied and Environmental Microbiology 1 2 Title Natural Competence in Thermoanaerobacter and Thermoanaerobacterium Species 3 Running Title Thermonanerobacter Natural Competence 4 5 Authors and Affiliations 6 A. Joe Shaw 1,2 , David A. Hogsett 1 , Lee R. Lynd 1,2,3 * 7 1 Mascoma Corporation, Lebanon, NH 03766 8 2 Thayer School of Engineering, Dartmouth College, Hanover, NH 03755 9 3 Department of Biological Sciences, Dartmouth College, Hanover, NH 03755 10 11 Corresponding Author 12 Lee R. Lynd 13 Thayer School of Engineering, Dartmouth College, Hanover, NH 03755 14 Phone: 603.646.2231 15 Email: lee.lynd@dartmouth.edu 16 17 18 19 20 21 22 23 Copyright © 2010, American Society for Microbiology and/or the Listed Authors/Institutions. All Rights Reserved.

275

IIS6  

Science Conference Proceedings (OSTI)

... Configuration button >App Mappings tab, Rule Title ... Web Sites => => right click Properties ... defined by the 'User Rights Assignment' setting ...

2013-02-22T23:59:59.000Z

276

Learning About the Equal Employment Opportunity - Title VII - Complaint  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Learning About the Equal Employment Opportunity - Title VII - Learning About the Equal Employment Opportunity - Title VII - Complaint Process Learning About the Equal Employment Opportunity - Title VII - Complaint Process Learn about what is unlawful under Title VII, the legislation behind it, the steps before filing a complaint (mediation), how an individual files an official Title VII complaint, the acceptance or dismissal process, the investigation process, and the resolution process. Your Coverage Under Equal Employment Opportunity - Title VII A discriminatory action is unlawful under Title VII if: The discriminating party is an employer, employment agency or labor organization defined by Title VII; The basis for the alleged discrimination is race, color, religion, sex, national origin, or retaliation. This issue or claim involves a discriminatory matter or personnel

277

ACQUISITION CERTIFICATION - FINANCIAL ASSISTANCE LEVEL II PART A - EMPLOYEE INFORMATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FA Level II UPD 102012 1 FA Level II UPD 102012 1 ACQUISITION CERTIFICATION - FINANCIAL ASSISTANCE LEVEL II PART A - EMPLOYEE INFORMATION Name (Last, First, Middle initial)_____________________________________________ Email Address____________________________________________________________ Phone___________________________________________________________________ Agency Name ____________________________________________________________ Agency Address__________________________________________________________ Title, Series, Grade________________________________________________________ Education: Please specify degree and major: Degree: Associates: __; Bachelors __; Masters: __; Doctorate: __ Major: PART B - CERTIFICATION REQUIREMENTS

278

Majestic II | Open Energy Information  

Open Energy Info (EERE)

II II Facility Majestic II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser SWEPCO Location Amarillo TX Coordinates 35.3672156°, -101.5474892° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.3672156,"lon":-101.5474892,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

279

Harvest II | Open Energy Information  

Open Energy Info (EERE)

Harvest II Harvest II Facility Harvest II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Exelon Wind Developer Exelon Wind Energy Purchaser Consumers Energy Location Pigeon MI Coordinates 43.83861292°, -83.2171011° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.83861292,"lon":-83.2171011,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

280

Musselshell II | Open Energy Information  

Open Energy Info (EERE)

Musselshell II Musselshell II Facility Musselshell II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Goldwind Developer Volkswind USA Energy Purchaser NorthWestern Energy Location Ryegate MT Coordinates 46.26733°, -109.499175° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.26733,"lon":-109.499175,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Glacier II | Open Energy Information  

Open Energy Info (EERE)

II II Facility Glacier II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NaturEner Developer NaturEner Energy Purchaser San Diego Gas & Electric Location Near Ethridge MT Coordinates 48.555639°, -112.120992° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.555639,"lon":-112.120992,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

282

Luz II | Open Energy Information  

Open Energy Info (EERE)

Luz II Luz II Jump to: navigation, search Name Luz II Place Jerusalem, Israel Zip 91450 Sector Solar Product Jerusalem-based utility-scale solar power plant developer. Coordinates 31.7736°, 35.224998° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":31.7736,"lon":35.224998,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

283

TITLE V-CONFIDENTIAL INFORMATION PROTECTION AND STATISTICAL EFFI-  

Gasoline and Diesel Fuel Update (EIA)

6 STAT. 2962 6 STAT. 2962 PUBLIC LAW 107-347-DEC. 17 2002 TITLE V-CONFIDENTIAL INFORMATION PROTECTION AND STATISTICAL EFFI- CIENCY SEC. 501. SHORT TITLE. This title may be cited as the ''Confidential Information Protec- tion and Statistical Efficiency Act of 2002''. SEC. 502. DEFINITIONS. As used in this title: (1) The term ''agency'' means any entity that falls within the definition of the term ''executive agency'' as defined in section 102 of title 31, United States Code, or ''agency'', as defined in section 3502 of title 44, United States Code. (2) The term ''agent'' means an individual- (A)(i) who is an employee of a private organization or a researcher affiliated with an institution of higher learning (including a person granted special sworn status by the Bureau of the Census under section 23(c) of title

284

TANK DEIS SUMMARY TITLE PG.psd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Summary S-iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site High-Level Waste Tank Closure Environmental Impact Statement (DOE/EIS-0303), Aiken, South Carolina. CONTACT: For additional information on this environmental impact statement (EIS), write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office Building 730B, Room 2418 Aiken, South Carolina 29802 Attention: Tank Closure EIS Local and Nationwide Telephone: (800) 881-7292 Email: nepa@srs.gov For general information on DOE's National Environmental Policy Act (NEPA) process, write or call: Ms. Carol M. Borgstrom, Director Office of NEPA Policy and Compliance, EH-42 U.S. Department of Energy 1000 Independence Avenue, S.W.

285

Microsoft Word - Title X Reimbursements.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy U.S. Department of Energy Office of Inspector General Office of Audit Operations Audit Report Management Controls Over Title X Claims Reimbursement at the West Chicago Thorium Processing Facility OAS-M-04-08 September 2004 previously approved by the Department from the 1994 through 2001 claims. This occurred because the Department had not developed an assurance strategy that included both adequate technical and financial reviews of the Kerr-McGee claims. As a result, the Department could pay Kerr-McGee up to $164 million more for clean-up without adequate assurance that only reimbursable costs will be paid. During the audit, the Department initiated corrective actions by requiring that DCAA issue an opinion on the adequacy of the 2002 claimed costs and by removing the $4 million in disallowed

286

TANK DEIS TITLE PG.psd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cover Sheet Cover Sheet iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site High-Level Waste Tank Closure Environmental Impact Statement (DOE/EIS-0303), Aiken, South Carolina CONTACT: For additional information on this environmental impact statement (EIS), write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office Building 730B, Room 2418 Aiken, South Carolina 29802 Attention: Tank Closure EIS Local and Nationwide Telephone: (800) 881-7292 Email: nepa@srs.gov For general information on DOE's National Environmental Policy Act (NEPA), write or call: Ms. Carol M. Borgstrom, Director Office of NEPA Policy and Compliance, EH-42 U.S. Department of Energy 1000 Independence Avenue, S.W.

287

EOTA - Business Form Document Title: Nonconformance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

5 Nonconformance Report 07_1206.doc 07_1206 Page 1 of 3 5 Nonconformance Report 07_1206.doc 07_1206 Page 1 of 3 EOTA - Business Form Document Title: Nonconformance Report Document Number: F-015 Rev. 07_12-06 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-011, Nonconforming Material / Product Process Notify of Changes: EOTA Employees Referenced Document(s): N/A F-015 Nonconformance Report 07_1206.doc 07_1206 Page 2 of 3 Revision History: Rev. Description of Change A Initial Release 07_1206 Converted form F-015 to a Word Form. Changed layout of form. No content changes were done. C D E F-015 Nonconformance Report 07_1206.doc 07_1206 Page 1 of 1 Nonconformance Report (NCR) General Information NCR # -

288

Title, Location, Document Number Estimated Cost Description  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moody to Lev, SUBJECT: NEPA 2012 APS for DOE-SRS, Dated: JAN 25 2012 Moody to Lev, SUBJECT: NEPA 2012 APS for DOE-SRS, Dated: JAN 25 2012 Title, Location, Document Number Estimated Cost Description EA Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain EA Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $65,000 Annual NEPA Planning Summary NEPA Reviews of Proposals to Implement Enterprise SRS Initiatives unknown The Savannah River Site Strategic Plan for 2011 - 2015 describes 12 initiatives that Enterprise SRS will pursue by applying SRS's management core competencies in nuclear materials. Implementation of new missions resulting from this effort will likely require NEPA review. However, until firm proposals are developed

289

1987 annual report to the Advisory Council on Historic Preservation and the Colorado State Historic Preservation Officer on the Department of Energy`s cultural resource activities at Colorado UMTRA Project sites  

SciTech Connect

This report is a summary of the Department of Energy`s (DOE) cultural resource investigations related to the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado. This report is intended to fulfill the DOE`s obligation for an annual report as stated in the Programmatic Memorandum of Agreement executed between the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer in December, 1984. A summary of the cultural resource surveys and identified resources is provided for project sites in the vicinities of Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. This report summarizes all DOE UKTRA Project cultural resource activities in Colorado for the 1987 calender year.

Not Available

1988-04-01T23:59:59.000Z

290

Breezy Bucks II | Open Energy Information  

Open Energy Info (EERE)

Breezy Bucks II Breezy Bucks II Facility Breezy Bucks II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Breezy Bucks II LLC / John Deere Wind Energy Developer Breezy Bucks II LLC / John Deere Wind Energy Energy Purchaser Xcel Energy Location Lake Benton MN Coordinates 44.3144°, -96.3317° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.3144,"lon":-96.3317,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

291

Heber II Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

II Geothermal Facility II Geothermal Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Heber II Geothermal Facility General Information Name Heber II Geothermal Facility Facility Heber II Sector Geothermal energy Location Information Location Imperial Valley, California Coordinates 33.03743°, -115.621591° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.03743,"lon":-115.621591,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

292

Navy II Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

II Geothermal Facility II Geothermal Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Navy II Geothermal Facility General Information Name Navy II Geothermal Facility Facility Navy II Sector Geothermal energy Location Information Location Coso Junction, California Coordinates 36.018975669535°, -117.79197692871° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.018975669535,"lon":-117.79197692871,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

293

Ormesa II Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

II Geothermal Facility II Geothermal Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Ormesa II Geothermal Facility General Information Name Ormesa II Geothermal Facility Facility Ormesa II Sector Geothermal energy Location Information Address 3300 East Evan Hewes Highway Location Holtville, California Zip 92250 Coordinates 32.787238448581°, -115.24778366089° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.787238448581,"lon":-115.24778366089,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

294

Steamboat II Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

II Geothermal Facility II Geothermal Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Steamboat II Geothermal Facility General Information Name Steamboat II Geothermal Facility Facility Steamboat II Sector Geothermal energy Location Information Location Washoe, Nevada Coordinates 40.5608387°, -119.6035495° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.5608387,"lon":-119.6035495,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

295

Interaction between Titles 2 and 3 of the Clean Air Act as amended, 1990  

SciTech Connect

This report examines Some issues that would I affect the refining industry if the requirements for hazardous air pollutants set out in Title III of the Clean Air Act Amendments were to impede the market entrance of oxygenated fuels, as me; required by Title II. It describes the mandate for reformulated gasoline; considers gasoline characteristics in light of component shifts in refining; examines the supply of, demand for, and cost of various feedstocks and blendstocks; and identifies the emissions and atmospheric impacts that might result from the production and use of reformulated gasoline. Attention is focused on methanol and MTBE, two potential blendstocks that are also hazardous air pollutants, and on maximum achievable control technology standards, which might be applied to the stationary sources that produce them.

Szpunar, C.B.

1996-02-01T23:59:59.000Z

296

DOE receives title to Great Plains plant  

Science Conference Proceedings (OSTI)

On June 30, 1986 the Great Plains Coal Gasification Project was sold at a foreclosure sale at the Mercer County courthouse in North Dakota. The US Department of Energy was the only bidder at the sale. DOE's bid for the plant was $1 billion DOE-secured loan that the five sponsor companies defaulted on when they withdrew from the project in August 1985. DOE did not receive title to the plant until a lawsuit filed by American Natural Resources (ANR) was settled on July 14, 1986. DOE has vowed to keep the plant running as long as it does not cost the taxpayers any money. Eventually DOE wishes to dispose of the plant. Therefore, in February 1986 DOE requested that interested organizations submit expressions of interest in the Great Plains plant. This paper, after discussing the lawsuit, summarizes the nine responses received by DOE. Some companies were willing for it to remain a coal gasification facility; other submitted plans for modifications to produce methanol.

Not Available

1986-09-01T23:59:59.000Z

297

RECIPIENT:Utah County STATE: UT PROJECT TITLE:  

NLE Websites -- All DOE Office Websites (Extended Search)

Utah County STATE: UT PROJECT TITLE: EECBG - Utah County Energy Efficiency Retrofits Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm...

298

title Brookhaven National Laboratory Inside RHIC News Features...  

NLE Websites -- All DOE Office Websites (Extended Search)

Inside RHIC News Features title description Brookhaven National Laboratory conducts research in the physical biomedical and environmental sciences as well as in energy technologies...

299

Response to Request for Information titled "Addressing Policy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

energy and climate policy reduces the likelihood of a significant reduction in greenhouse gas emissions or energy imports. Response to Request for Information titled "Addressing...

300

title Thermal Energy Storage for Electricity Peakdemand Mitigation  

NLE Websites -- All DOE Office Websites (Extended Search)

proceedings title Thermal Energy Storage for Electricity Peakdemand Mitigation A Solution in Developing and Developed World Alike journal ECEEE Summer Study textendash June...

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

title Microgrid Reliability Modeling and Battery Scheduling Using...  

NLE Websites -- All DOE Office Websites (Extended Search)

article title Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming journal Journal of Electric Power Systems Research volume year month pages...

302

RECIPIENT:Dehlsen Associates STATE: CA PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATE: CA PROJECT TITLE: Marine & Hydrokinetic Energy System Development of the Aquantis 2.5MW Ocean-Current Electricity Generation Device Funding Opportunity Announcement...

303

SOAJ Search : Main View : Search Results for Title: "Genetic...  

Office of Scientific and Technical Information (OSTI)

Search: Title: "Genetic parameters for five traits in Africanized honeybees using Bayesian inference" Did you mean ? Create new alert from this search New Search My Selections (0)...

304

RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE...  

NLE Websites -- All DOE Office Websites (Extended Search)

Page 1 01 :L RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE: Hull Offshore Wind Research and Development Funding Opportunity Announcement Number Procurement...

305

DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled...  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled...

306

Web search result summarization: title selection algorithms and user satisfaction  

Science Conference Proceedings (OSTI)

Eye tracking experiments have shown that titles of Web search results play a crucial role in guiding a user's search process. We present a machine-learned algorithm that trains a boosted tree to pick the most relevant title for a Web search result. We ... Keywords: machine learning, user satisfaction, web summarization

Tapas Kanungo; Nadia Ghamrawi; Ki Yuen Kim; Lawrence Wai

2009-11-01T23:59:59.000Z

307

Reducing Nitrogen Oxide Emissions: 1996 Compliance with Title IV Limits  

Reports and Publications (EIA)

The purpose of this article is to summarize the existing Federal Nox regulations and the 1996 performance of the 239 Title IV generating units. It also reviews the basics of low-Nox burner technology and presents cost and performance data for retrofits at Title IV units.

Information Center

1998-05-01T23:59:59.000Z

308

Title IX: More than Just Sports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title IX: More than Just Sports Title IX: More than Just Sports Title IX: More than Just Sports June 23, 2011 - 5:41pm Addthis Bill Valdez Bill Valdez Principal Deputy Director What does this mean for me? The Department works to ensure there is no discrimination on the basis of gender in educational programs at institutions that receive Federal financial assistance. Office of Civil Rights staff work to ensure that the recruitment, retention, training and education practices at schools are inclusive for both men and women. Most people think sports when they think about Title IX. However, Title IX's scope is much broader than that, and the Energy Department actively works to help ensure that there is no discrimination on the basis of gender in educational programs at institutions that receive Federal financial

309

40th Anniversary of Title IX | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

40th Anniversary of Title IX 40th Anniversary of Title IX 40th Anniversary of Title IX June 22, 2012 - 10:15am Addthis Dot Harris, Director of the Office of Economic Impact and Diversity (pictured in middle of photo) with a group of Girl Scouts and Girls Inc members during a mentoring session after the White House Title IX Anniversary celebration on Wednesday. Dot Harris, Director of the Office of Economic Impact and Diversity (pictured in middle of photo) with a group of Girl Scouts and Girls Inc members during a mentoring session after the White House Title IX Anniversary celebration on Wednesday. Editor's Note: This blog is authored by Valerie Jarrett, Senior Advisor and Assistant to the President for Intergovernmental Affairs and Public Engagement. This was originally posted on the White House blog.

310

Bishop Hill II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Bishop Hill II Facility Bishop Hill II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner MidAmerican Energy Developer Ivenergy Energy Purchaser Ameren Illinois Location Cambridge IL Coordinates 41.24438513°, -90.09338379° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.24438513,"lon":-90.09338379,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

311

Pinyon Pines II | Open Energy Information  

Open Energy Info (EERE)

Pinyon Pines II Pinyon Pines II Jump to: navigation, search Name Pinyon Pines II Facility Pinyon Pines II (Alta IX) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner MidAmerican Energy Developer Terra-Gen Power Energy Purchaser Southern California Edison Co Location Tehachapi Pass CA Coordinates 35.01917213°, -118.3031845° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.01917213,"lon":-118.3031845,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

312

CWES II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

II Wind Farm II Wind Farm Jump to: navigation, search Name CWES II Wind Farm Facility CWES II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner SeaWest Developer SeaWest Energy Purchaser Pacific Gas & Electric Co Location Altamont Pass CA Coordinates 37.7347°, -121.652° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.7347,"lon":-121.652,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

313

Springview II Wind Project | Open Energy Information  

Open Energy Info (EERE)

Springview II Wind Project Springview II Wind Project Jump to: navigation, search Name Springview II Wind Project Facility Springview II Wind Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Bluestem LLC Developer Bluestem LLC Energy Purchaser NPPD Location Springview NE Coordinates 42.82578163°, -99.77630854° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.82578163,"lon":-99.77630854,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

314

Los Vientos II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Los Vientos II Facility Los Vientos II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Duke Energy Developer Duke Enegy Energy Purchaser Austin Energy Location Lyford TX Coordinates 26.33903762°, -97.66176224° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.33903762,"lon":-97.66176224,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

315

Pillar Mountain II | Open Energy Information  

Open Energy Info (EERE)

Pillar Mountain II Pillar Mountain II Jump to: navigation, search Name Pillar Mountain II Facility Pillar Mountain II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Kodiak Electric Assoc. Developer Kodiak Electric Assoc. Energy Purchaser Kodiak Electric Assoc. Location Kodiak AK Coordinates 57.78667872°, -152.4434781° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":57.78667872,"lon":-152.4434781,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

316

Shiloh II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Shiloh II Wind Farm Shiloh II Wind Farm Jump to: navigation, search Name Shiloh II Wind Farm Facility Shiloh II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner EnXco Developer EnXco Energy Purchaser Pacific Gas & Electric Co Location Northern CA CA Coordinates 38.179998°, -121.822° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.179998,"lon":-121.822,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

317

Kibby Mountain II | Open Energy Information  

Open Energy Info (EERE)

Kibby Mountain II Kibby Mountain II Jump to: navigation, search Name Kibby Mountain II Facility Kibby Mountain II Sector Wind energy Facility Type Commercial Scale Wind Facility Status Under Construction Owner TransCanada Power Mktg Ltd Developer TransCanada Power Mktg Ltd Location Kibby Mountain ME Coordinates 45.354154°, -70.65412° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.354154,"lon":-70.65412,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

318

Nobles Wind Farm II | Open Energy Information  

Open Energy Info (EERE)

Wind Farm II Wind Farm II Jump to: navigation, search Name Nobles Wind Farm II Facility Nobles Wind Farm II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Xcel Energy Developer EnXco Energy Purchaser Xcel Energy Location Nobles County MN Coordinates 43.682956°, -95.728425° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.682956,"lon":-95.728425,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

319

Timber Road II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Timber Road II Facility Timber Road II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horizon Wind Energy Developer Horizon Wind Energy Energy Purchaser American Electric Power Location Near Payne OH Coordinates 41.023524°, -84.717185° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.023524,"lon":-84.717185,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

320

Little Pringle II | Open Energy Information  

Open Energy Info (EERE)

Pringle II Pringle II Jump to: navigation, search Name Little Pringle II Facility Little Pringle II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner SWI Wind Farms Developer SWI Wind Farms Energy Purchaser Xcel Energy Location 50 miles north of Amarillo TX Coordinates 35.803356°, -101.43352° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.803356,"lon":-101.43352,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Salty Dog II | Open Energy Information  

Open Energy Info (EERE)

II II Facility Salty Dog II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Salty Dog II LLC Energy Purchaser Xcel Energy Location Lake Benton MN Coordinates 44.3144°, -96.3256° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.3144,"lon":-96.3256,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

322

Vansycle Ridge II | Open Energy Information  

Open Energy Info (EERE)

Vansycle Ridge II Vansycle Ridge II Jump to: navigation, search Name Vansycle Ridge II Facility Vansycle Ridge II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Location OR Coordinates 45.8515°, -118.458° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.8515,"lon":-118.458,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

323

NCPA II Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

NCPA II Geothermal Facility NCPA II Geothermal Facility General Information Name NCPA II Geothermal Facility Facility NCPA II Sector Geothermal energy Location Information Location The Geysers, California Coordinates 38.74837690774°, -122.71119117737° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.74837690774,"lon":-122.71119117737,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

324

Elm Creek II | Open Energy Information  

Open Energy Info (EERE)

Elm Creek II Elm Creek II Jump to: navigation, search Name Elm Creek II Facility Elm Creek II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer Iberdrola Renewables Location Jackson and Martin County MN Coordinates 43.756372°, -94.956014° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.756372,"lon":-94.956014,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

325

Steel Winds II | Open Energy Information  

Open Energy Info (EERE)

Winds II Winds II Jump to: navigation, search Name Steel Winds II Facility Steel Winds II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner First Wind Developer First Wind Energy Purchaser Merchant Location Lackawanna NY Coordinates 42.81756607°, -78.86672974° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.81756607,"lon":-78.86672974,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

326

Sunray II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Sunray II Wind Farm Sunray II Wind Farm Jump to: navigation, search Name Sunray II Wind Farm Facility Sunray II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Valero Developer Valero Energy Purchaser McKee Refinery for 34.5; Xcel Energy for remainder Location TX Coordinates 35.961137°, -101.804602° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.961137,"lon":-101.804602,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

327

Montezuma Winds II | Open Energy Information  

Open Energy Info (EERE)

Winds II Winds II Jump to: navigation, search Name Montezuma Winds II Facility Montezuma Winds II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser Pacific Gas & Electric Co Location Rio Vista CA Coordinates 38.16867552°, -121.8061924° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.16867552,"lon":-121.8061924,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

328

Difwind II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

II Wind Farm II Wind Farm Jump to: navigation, search Name Difwind II Wind Farm Facility Difwind II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner EnXco Energy Purchaser Southern California Edison Co Location San Gorgonio CA Coordinates 33.9095°, -116.734° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.9095,"lon":-116.734,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

329

CHAPTER: In-Situ Characterization of Stimulating Microelectrode Arrays: Study of an Idealized Structure Based on Argus II Retinal implantsBOOK TITLE: Implantable Neural Prostheses 2: Techniques and Engineering Approaches, D.M. Zhou and E. Greenbaum, Eds., Springer, NY 2009  

SciTech Connect

The development of a retinal prosthesis for artificial sight includes a study of the factors affecting the structural and functional stability of chronically implanted microelectrode arrays. Although neuron depolarization and propagation of electrical signals have been studied for nearly a century, the use of multielectrode stimulation as a proposed therapy to treat blindness is a frontier area of modern ophthalmology research. Mapping and characterizing the topographic information contained in the electric field potentials and understanding how this information is transmitted and interpreted in the visual cortex is still very much a work in progress. In order to characterize the electrical field patterns generated by the device, an in vitro prototype that mimics several of the physical and chemical parameters of the in vivo visual implant device was fabricated. We carried out multiple electrical measurements in a model 'eye,' beginning with a single electrode, followed by a 9-electrode array structure, both idealized components based on the Argus II retinal implants. Correlating the information contained in the topographic features of the electric fields with psychophysical testing in patients may help reduce the time required for patients to convert the electrical patterns into graphic signals.

Greenbaum, Elias [ORNL; Sanders, Charlene A [ORNL; Kandagor, Vincent [ORNL

2010-01-01T23:59:59.000Z

330

Administrative Code Title 83, Public Utilities (Illinois) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administrative Code Title 83, Public Utilities (Illinois) Administrative Code Title 83, Public Utilities (Illinois) Administrative Code Title 83, Public Utilities (Illinois) < Back Eligibility Commercial Municipal/Public Utility Rural Electric Cooperative Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Illinois Program Type Environmental Regulations Generating Facility Rate-Making Renewables Portfolio Standards and Goals Safety and Operational Guidelines Training/Technical Assistance Provider Illinois Commerce Commission In addition to general rules for utilities, this article states regulations for the protection of underground utilities, promotional practices of electric and gas public utilities construction of electric power and

331

DOE - Office of Legacy Management -- Pathfinder Lucky Mc Site - 042  

NLE Websites -- All DOE Office Websites (Extended Search)

Pathfinder Lucky Mc Site - 042 Pathfinder Lucky Mc Site - 042 FUSRAP Considered Sites Site: Pathfinder Lucky Mc Site (042) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Pathfinder Lucky Mc site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in the Gas Hills Uranium Mining District west of Casper, Wyoming. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Radiation Control Act was passed in 1978. The majority of the milling conducted at these sites was for private sale, but a portion was sold to the U.S. Government. After the owner completes U.S. Nuclear Regulatory Commission license termination,

332

DOE - Office of Legacy Management -- WNI Sherwood Site - 039  

NLE Websites -- All DOE Office Websites (Extended Search)

Sherwood Site - 039 Sherwood Site - 039 FUSRAP Considered Sites Site: WNI Sherwood Site (039) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in the State of Washington. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Radiation Control Act was passed in 1978. The majority milling conducted at this site was for private sale. After the owner completes NRC license termination the Department of Energy¿s Grand Junction Office will be responsible for providing stewardship for the groundwater and disposal

333

DOE - Office of Legacy Management -- Chevron Panna Maria Site - 030  

NLE Websites -- All DOE Office Websites (Extended Search)

Chevron Panna Maria Site - 030 Chevron Panna Maria Site - 030 FUSRAP Considered Sites Site: Chevron Panna Maria Site (030) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Texas. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Radiation Control Act was passed in 1978. The milling conducted at this site was for private sale. After the owner completes U. S. Nuclear Regulatory Commission license termination the Department of Energy¿s Grand Junction Office will be responsible for providing stewardship for the groundwater and disposal

334

DOE - Office of Legacy Management -- WNI Split Rock Site - 043  

NLE Websites -- All DOE Office Websites (Extended Search)

Split Rock Site - 043 Split Rock Site - 043 FUSRAP Considered Sites Site: WNI Split Rock Site (043) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Western Nuclear, Inc. (WNI) Split Rock site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Jeffrey City, Wyoming. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Control Act was passed in 1978. The majority of the milling conducted at these sites was for private sale, but a portion was sold to the U.S. Government. After the owner completes U.S. Nuclear Regulatory Commission license termination, the Department of

335

DOE - Office of Legacy Management -- ANC Gas Hills Site - 040  

NLE Websites -- All DOE Office Websites (Extended Search)

ANC Gas Hills Site - 040 ANC Gas Hills Site - 040 FUSRAP Considered Sites Site: ANC Gas Hills Site (040) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The ANC Gas Hills site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Gas Hills, Wyoming. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Radiation Control Act was passed in 1978. The majority of the milling conducted at these sites was for private sale, but a portion was sold to the U.S. Government. After the owner completes U.S. Nuclear Regulatory Commission license termination, the Department of Energy¿s

336

DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled  

NLE Websites -- All DOE Office Websites (Extended Search)

RFI 2010-11129 NBP RFI: Communications Requirements Titled RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" Grid Net, Inc. Comments on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy"

337

Department of Education Title IX and Access to STEM Education...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the requirements of Title IX relate to STEM. It also offers recommendations to assist schools in ensuring that their STEM courses and programs do not have the purpose or effect of...

338

Quarterly title list for the period ending June 1975  

SciTech Connect

A list of the laboratory reports issued the publications made, the articles submitted for publication as well as the lectures held are dealt with. Abstracts of the works are to a large extent included with the titles. (GG/LH)

1975-01-01T23:59:59.000Z

339

Name Title Work Phone Work E-Mail  

NLE Websites -- All DOE Office Websites (Extended Search)

12012 EOTA - STAFF Name Title Work Phone Work E-Mail Melissa Otero Program Manager 505-842-7112 motero@eota.energy.gov Janet Lee Online Learning Support Specialist 505-842-7110...

340

Title 40 CFR Part 191 Subparts B and C  

E-Print Network (OSTI)

...............................................................................................................46-2 DOE/WIPP-09-3424 Section 46-200946-iii #12;Title 40 CFR Part 191 Subparts B and C Compliance Recertification Application 2009 This page intentionally left blank. DOE/WIPP-09-3424 Section 46-200946-iv #12 WIPP Waste Isolation Pilot Plant DOE/WIPP-09-3424 Section 46-200946-v #12;Title 40 CFR Part 191

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Title 40 CFR Part 191 Subparts B and C  

E-Print Network (OSTI)

......................................................................................................................45-3 DOE/WIPP-09-3424 Section 45-200945-iii #12;Title 40 CFR Part 191 Subparts B and C Compliance Recertification Application 2009 This page intentionally left blank. DOE/WIPP-09-3424 Section 45-200945-iv #12 assessment WIPP Waste Isolation Pilot Plant DOE/WIPP-09-3424 Section 45-200945-v #12;Title 40 CFR Part 191

342

Polarimetric Remote Sensing in the Visible to Near Infrared James R. Shell II  

E-Print Network (OSTI)

Polarimetric Remote Sensing in the Visible to Near Infrared by James R. Shell II B.S. Physics Title of Dissertation: Polarimetric Remote Sensing in the Visible to Near Infrared I, James R. Shell II Remote Sensing in the Visible to Near Infrared by James R. Shell II Submitted to the Chester F. Carlson

Salvaggio, Carl

343

Adair Wind Farm II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Adair Wind Farm II Facility Adair Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner MidAmerican Energy Developer MidAmerican Energy Energy Purchaser MidAmerican Energy Location IA Coordinates 41.499234°, -94.692628° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.499234,"lon":-94.692628,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

344

Combine Hills II | Open Energy Information  

Open Energy Info (EERE)

Combine Hills II Combine Hills II Facility Combine Hills II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Eurus Developer Eurus Energy Purchaser Clark County PUD Location Near Milton-Freewater OR Coordinates 45.946742°, -118.56828° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.946742,"lon":-118.56828,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

345

Endeavor II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

II Wind Farm II Wind Farm Facility Endeavor II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Location Osceola and Dickenson Counties IA Coordinates 43.427012°, -95.414987° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.427012,"lon":-95.414987,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

346

Crystal Lake II | Open Energy Information  

Open Energy Info (EERE)

II II Facility Crystal Lake II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Location Hancock/Winnebago Counties IA Coordinates 43.16151°, -93.855786° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.16151,"lon":-93.855786,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

347

Ashtabula II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Ashtabula II Wind Farm Ashtabula II Wind Farm Facility Ashtabula II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser Minnkota Power Cooperative Location Griggs & Steele Counties ND Coordinates 47.133005°, -97.950597° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.133005,"lon":-97.950597,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

348

Tatanka Wind Project II | Open Energy Information  

Open Energy Info (EERE)

Tatanka Wind Project II Tatanka Wind Project II Jump to: navigation, search Name Tatanka Wind Project II Facility Tatanka Wind Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Acciona Energy Developer Acciona Energy Location Dickey and McIntosh Counties ND Coordinates 45.951884°, -98.940482° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.951884,"lon":-98.940482,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

349

Cannon II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Cannon II Wind Farm Cannon II Wind Farm Facility Cannon II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Energy Purchaser Southern California Edison Co Location Tehachapi CA Coordinates 35.1317°, -118.451° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.1317,"lon":-118.451,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

350

Carleton College II | Open Energy Information  

Open Energy Info (EERE)

Carleton College II Carleton College II Facility Carleton College II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Carleton College Developer Carleton College Energy Purchaser Xcel Energy Location Northfield MN Coordinates 44.46881856°, -93.12780976° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.46881856,"lon":-93.12780976,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

351

Moraine II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Moraine II Wind Farm Moraine II Wind Farm Facility Moraine II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer Iberdrola Renewables Energy Purchaser Xcel Energy Location Pipestone & Murray Counties MN Coordinates 44.012466°, -96.114764° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.012466,"lon":-96.114764,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

352

Endicott Biofuels II LLC | Open Energy Information  

Open Energy Info (EERE)

Endicott Biofuels II LLC Endicott Biofuels II LLC Jump to: navigation, search Name Endicott Biofuels II, LLC Place Houston, Texas Zip 77060-3235 Sector Biofuels Product Houston-based biofuels producer that is currently developing biodiesel refining facilities throughout the US. Coordinates 29.76045°, -95.369784° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.76045,"lon":-95.369784,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

353

Oliver II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Oliver II Wind Farm Oliver II Wind Farm Facility Oliver II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser Minnesota Power Location ND Coordinates 47.180446°, -101.225116° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.180446,"lon":-101.225116,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

354

Marengo II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Marengo II Wind Farm Marengo II Wind Farm Facility Marengo II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner PacifiCorp Developer RES Americas Energy Purchaser PacifiCorp Coordinates 46.448343°, -117.851043° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.448343,"lon":-117.851043,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

355

KODE Novus Phase II | Open Energy Information  

Open Energy Info (EERE)

KODE Novus Phase II KODE Novus Phase II Facility KODE Novus Phase II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner DeWind Developer DeWind Energy Purchaser Xcel Energy Location Guymon OK Coordinates 36.53170885°, -101.3325691° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.53170885,"lon":-101.3325691,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

356

Meadow Lake II | Open Energy Information  

Open Energy Info (EERE)

Meadow Lake II Meadow Lake II Facility Meadow Lake II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horizon Wind Energy Developer EDP Renewables Location Brookston IN Coordinates 40.601111°, -86.864167° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.601111,"lon":-86.864167,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

357

Elk City II | Open Energy Information  

Open Energy Info (EERE)

Elk City II Elk City II Facility Elk City II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser Public Service Company of Oklahoma Location Roger Mills and Beckham Counties OK Coordinates 35.569747°, -99.448256° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.569747,"lon":-99.448256,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

358

Kaheawa Wind II | Open Energy Information  

Open Energy Info (EERE)

Kaheawa Wind II Kaheawa Wind II Facility Kaheawa Wind II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner First Wind Developer First Wind Energy Purchaser Maui Electric Co Location Wailuku HI Coordinates 20.80811344°, -156.547451° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":20.80811344,"lon":-156.547451,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

359

AE Biofuels Inc formerly Marwich II Ltd | Open Energy Information  

Open Energy Info (EERE)

AE Biofuels Inc formerly Marwich II Ltd AE Biofuels Inc formerly Marwich II Ltd Jump to: navigation, search Name AE Biofuels Inc. (formerly Marwich II Ltd.) Place West Palm Beach, Florida Zip 33414 Sector Biofuels Product Marwich II, Ltd. (OTC.BB: MWII.OB) merged in December 2007 with AE Biofuels, Inc., formerly American Ethanol. Subsequently Marwich II, Ltd. has changed its name to AE Biofuels (OTC: AEBF). References AE Biofuels Inc. (formerly Marwich II Ltd.)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. AE Biofuels Inc. (formerly Marwich II Ltd.) is a company located in West Palm Beach, Florida . References ↑ "[ AE Biofuels Inc. (formerly Marwich II Ltd.)]" Retrieved from "http://en.openei.org/w/index.php?title=AE_Biofuels_Inc_formerly_Marwich_II_Ltd&oldid=341812"

360

Glossary of Screen Labels for PARS II V1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Glossary 1 Glossary 1 Glossary of Screen Labels for PARS II V1.0.0 Goal The primary goal of this glossary is to help PARS II end users understand the items of data that they are viewing or entering on their PARS II application screens. It does not provide technical information on the schema of the PARS II database. A separate PARS II Data Dictionary document is being provided for PARS II users who need such technical information. Overview This document consists of a table defining each data label displayed on PARS II screens. It is divided into sections by PARS II screen title. To find the meaning of a data item, first find the section describing the relevant screen, then find the particular screen label description. The sections are listed in order of the major functional area of the PARS II System:

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

TITLE XIII- SMART GRID SEC. 1301- 1308 STATEMENT OF POLICY ON...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TITLE XIII- SMART GRID SEC. 1301- 1308 STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID TITLE XIII- SMART GRID SEC. 1301- 1308 STATEMENT OF POLICY ON MODERNIZATION OF...

362

File:AlaskaTitleVApplicationSubmittalInstructions.pdf | Open Energy  

Open Energy Info (EERE)

AlaskaTitleVApplicationSubmittalInstructions.pdf AlaskaTitleVApplicationSubmittalInstructions.pdf Jump to: navigation, search File File history File usage File:AlaskaTitleVApplicationSubmittalInstructions.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 20 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:34, 1 November 2012 Thumbnail for version as of 11:34, 1 November 2012 1,275 × 1,650 (20 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from

363

EA-1290: Disposition of Russian Federation Titled Natural Uranium |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

290: Disposition of Russian Federation Titled Natural Uranium 290: Disposition of Russian Federation Titled Natural Uranium EA-1290: Disposition of Russian Federation Titled Natural Uranium SUMMARY This EA evaluates the potential environmental impacts of a proposal to transport up to an average of 9,000 metric tons per year of natural uranium as uranium hexafluoride (UF6) from the United States to the Russian Federation. This amount of uranium is equivalent to 13,3000 metric tons of UF6. The EA also examines the impacts of this action on the global commons. Transfer of natural UF6 to the Russian Federation is part of a joint U.S./Russian program to dispose of highly enriched uranium (HEU) from dismantled Russian nuclear weapons. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD

364

PARS II User Account Access Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Management Office of Management Office of Engineering and Construction Management User Account Access Guide for PARS II Version 1.5 June 25, 2011 Submitted by: Energy Enterprise Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net June 25, 2011 (V1.5) PARS II User Account Access Guide ii This page intentionally left blank. June 25, 2011 (V1.5) PARS II User Account Access Guide iii Title Page Document Name: User Account Access Guide for PARS II Version Number: V1.5 Publication Date: June 25, 2011 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07 CLIN 4 Prepared by: Scott Burns, Energy Enterprise Solutions, LLC Reviewed by: Judith Bernsen, Energy Enterprise Solutions, LLC

365

PARS II Change Request (CR) Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title: Phone #: Office/Symbol: Email: CHANGE TYPE: Defect: New Requirement: PRIORITY: PARS II Change Request Form (APR 2011) PARS II Change Request (CR) Form 1 = Prevents the accomplishment of an essential PARS-II capability 3 = Adversely affects the accomplishment of an essential PARS-II capability, but a work-around solution is known 4 = Results in User / Operator inconvenience or annoyance, but does not affect an essential PARS-II capability 5 = Any other effect 1) Detailed description of problem/need. (If possible, provide project #(s) you are working with). PROBLEM/CHANGE DESCRIPTION: 2) Where in system defect is seen or where new functionality is required (i.e., which screen, which report). Screenshots (as separate attachments) are helpful.

366

Enforcement of DOE Classified Information Security Requirements Under Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of DOE Classified Information Security Requirements of DOE Classified Information Security Requirements Under Title 10, Code of Federal Regulations, Part 824 Enforcement of DOE Classified Information Security Requirements Under Title 10, Code of Federal Regulations, Part 824 In publishing 10 CFR Part 824, DOE has determined that civil penalties under Part 824 will only be assessed for violations of requirements for the protection of classified information (Restricted Data, Formerly Restricted Data and National Security Information). The rule does not include civil penalties relating to failure to protect sensitive but unclassified information. IMPLEMENTATION GUIDANCE More Documents & Publications Safety and Security Enforcement Process Overview Preliminary Notice, Battelle Energy Alliance, LLC, SEA-2011-01

367

Equal Employment Opportunity -Title VII | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Equal Employment Opportunity Equal Employment Opportunity -Title VII Equal Employment Opportunity -Title VII The Department of Energy does not discriminate on the basis of race, color, sex (including sexual harassment), religion, national origin, age, disability (physical or mental), sexual orientation, reprisal, parental status, protected genetic information, or any other non-merit factor. We are committed to equal employment opportunity principles and practices in all of our management decisions and personnel practices. To learn more about the Equal Employment Opportuity complaint process and mediation options, please view and download the links below: Equal Employment Opportunity Policy Statement & Harassment Policy Statement EEO Intake Form EEO/Diversity Managers Office Locations

368

Soda Lake II Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

Soda Lake II Geothermal Facility Soda Lake II Geothermal Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Soda Lake II Geothermal Facility General Information Name Soda Lake II Geothermal Facility Facility Soda Lake II Sector Geothermal energy Location Information Location Fallon, Nevada Coordinates 39.4727622°, -118.778963° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.4727622,"lon":-118.778963,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

369

Desert Peak II Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

II Geothermal Facility II Geothermal Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Desert Peak II Geothermal Facility General Information Name Desert Peak II Geothermal Facility Facility Desert Peak II Sector Geothermal energy Location Information Location Churchill, Nevada Coordinates 39.753854931241°, -118.95378112793° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.753854931241,"lon":-118.95378112793,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

370

Mammoth Pacific II Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

Mammoth Pacific II Geothermal Facility Mammoth Pacific II Geothermal Facility Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Mammoth Pacific II Geothermal Facility General Information Name Mammoth Pacific II Geothermal Facility Facility Mammoth Pacific II Sector Geothermal energy Location Information Location Sierra Nevada Mtns-Mono, California Coordinates 37.646227°, -118.909092° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.646227,"lon":-118.909092,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

371

A. E. K. Ris Kis-M-C?5II Title and authors)  

E-Print Network (OSTI)

by a "flashing correlation"). d) The distribution parameter C and the mean steam drift velocity v distribution led to an underprediction of the pressure after the expansion wave. A second calculation is based on the following description of the physical processes: a) The steam is saturated b) The water may

372

I-SAVE conservation program. Implementing title II of NECPA residential conservation service. Final draft  

SciTech Connect

The I-SAVE (Iowa Saves America's Vital Energy) conservation plan provides comprehensive energy-conservation information and services to residential consumers served by large investor-owned electric and gas utilities and participating home-heating suppliers. The overall objective of the I-SAVE plan is to conserve energy by facilitating cost-effective retrofit of existing housing and promoting more-efficient energy use. The ultimate benefit available to the customer under the I-SAVE plan - reduction in energy use - is dependent upon the action he or she takes as a result of the program audit. Benefits to the utility and the ratepayers as a whole, however, will accrue only upon widespread customer acceptance and utilization of program services. This degree of program acceptance and the resulting benefits to ratepayers can be attained only through an aggressive educational and promotional effort by the covered utilities. All electric and gas utilities which have sales, other than resale, exceeding 750 million kWh of electricity or 10 billion cubic feet of gas and participating home-heating suppliers, shall provide a program announcement and shall offer conservation services to their customers who occupy a residential building containing at least one, but not more than four units, in a manner as provided by the rules. The text of the rules is presented. (MCW)

Not Available

1980-05-30T23:59:59.000Z

373

Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

Science Conference Proceedings (OSTI)

The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

Chernoff, A.R. (USDOE Albuquerque Field Office, NM (United States). Uranium Mill Tailings Remedial Action Project Office); Lacker, D.K. (Texas State Dept. of Health, Austin, TX (United States). Bureau of Radiation Control)

1992-09-01T23:59:59.000Z

374

PARS II  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

too rapidly to see): a. Loading -PARS II is loading the report definition and data query. b. Downloading (generating report) c. Opening Excel d. Formatting report Report...

375

IIS5  

Science Conference Proceedings (OSTI)

... 1) enabled/disabled, (1) Internet Information Services (IIS) Manager GUI: Right Click on Server > Properties > Home Directory tab > Read, Chapter 2 ...

2013-02-22T23:59:59.000Z

376

RECIPIENT:NREL PROJECT TITLE: ESIF Excavation Soil Stockpile; NREL Tracking No. 11-013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROJECT TITLE: ESIF Excavation Soil Stockpile; NREL Tracking No. 11-013 Page 1 of2 **...*... @-~ .. @ '"',. .. ~ STATE: CO Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number NREL-11-013 GOO Based on my review ufthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: DOE/EA· Final Supplement-II to Final Site-Wide Environmental Assessment of the National Renewable Energy Laboratory's 1440·5·11 (NREL) South Table Mountain Complex (November 2009) DOE/EA· Final Site-Site Wide Environmental Assessment of the National Renewable Energy Laboratory's (NREL) South

377

Title 40 CFR Part 191 Subparts B and C  

E-Print Network (OSTI)

...............................................................................................................41-3 DOE/WIPP-09-3424 Section 41-200941-iii #12;Title 40 CFR Part 191 Subparts B and C Compliance Recertification Application 2009 This page intentionally left blank. DOE/WIPP-09-3424 Section 41-200941-iv #12.S. Environmental Protection Agency PA performance assessment WIPP Waste Isolation Pilot Plant DOE/WIPP-09

378

Abstract Title: "The Regional Sales Tax: An Innovative Approach to  

E-Print Network (OSTI)

Abstract Title: "The Regional Sales Tax: An Innovative Approach to State Transportation Finance and decreased federal transportation funding, alternative funding sources for transportation investment have become crucial to the provision of future infrastructure and the overall economic viability of the United

Wang, Yuhang

379

Fee Title: Renewable Energy Fee Measure #: Measure 44  

E-Print Network (OSTI)

Fee Title: Renewable Energy Fee Measure #: Measure 44 Ballot Information Shall the undergraduates and graduate students of UCSC amend Measure 28, the Renewable Energy fee passed in Spring 2006 as follows: The amendment would allow funds to be used for on-site renewables and energy efficiency projects

California at Santa Cruz, University of

380

Title: Web Services Developer (Web Designer) Category: Exempt Staff  

E-Print Network (OSTI)

Title: Web Services Developer (Web Designer) Category: Exempt Staff Department: Information Libraries is seeking a web designer to join their Digital Technology & Interface Services (DTIS) department on the College Park campus. DTIS develops and supports web-based services designed to meet the research needs

Kane, Andrew S.

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Title 40 CFR Part 191 Subparts B and C  

E-Print Network (OSTI)

Isolation Pilot Plant Waste Characterization (40 CFR § 194.24) United States Department of Energy Waste.S. Department of Energy 1995a) and two additional baseline reports, Transuranic Waste Baseline Inventory ReportTitle 40 CFR Part 191 Subparts B and C Compliance Recertification Application for the Waste

382

Title 40 CFR Part 191 Subparts B and C  

E-Print Network (OSTI)

Transuranic Waste Inventory Report­2007 (U.S. Department of Energy 2008) was published and provides updated of Energy (DOE). 2004. Title 40 CFR Part 191 Compliance Recertification Application for the Waste Isolation of Energy (DOE). 2006. Transuranic Waste Baseline Inventory Report­2004. DOE/TRU 2006-3344. Carlsbad, NM

383

Book review Title: Non-equilibrium thermodynamics for engineers  

E-Print Network (OSTI)

Book review Title: Non-equilibrium thermodynamics for engineers Authors: Signe Kjelstrup, Dick book represents a significant contribution to a better understanding of fundamental and applied non metrics" Krzysztof J. Ptasinski, member of EGY Book Review Panel 1. Review by Krzysztof J. Ptasinski

Kjelstrup, Signe

384

Title: Experimental Platform for Novel Distributed Microgrids Control Solutions  

E-Print Network (OSTI)

Title: Experimental Platform for Novel Distributed Microgrids Control Solutions Principal Investigator: Wenxin Liu Sponsor: U.S. Department of Defense Office of Naval Research Summary: Microgrid can, and can operate autonomously without connecting to power grid. The microgrid concept is a big step toward

Nishiguchi, Michele

385

PHYS 551 Lecture #27 Title: TightBinding  

E-Print Network (OSTI)

PHYS 551 Lecture #27 Title: Tight­Binding Now that we have shown that /( ~ k; ~r) = \\Gamma P ~ R e i ~ k \\Delta ~ R OE A (~r \\Gamma ~ R) satisfies the Bloch condition, all that remains is to grind the calculation explicitly. First, the wave­function /( ~ k; ~r) must be normalized. Thus Z / \\Lambda / dV = 1 = j

Winokur, Michael

386

1. Department, Course Number, Title ORE 677, Marine Renewable Energy  

E-Print Network (OSTI)

1. Department, Course Number, Title ORE 677, Marine Renewable Energy 2. Designation as a Required. Renewable Energy from the Ocean ­ a Guide to OTEC, W.H. Avery and C. Wu, Oxford University Press, 1994. 2 and tidal resources. 3. An understanding of the role of ocean renewable energy within the current worldwide

Frandsen, Jannette B.

387

ISLSCP II Project Page  

NLE Websites -- All DOE Office Websites (Extended Search)

ISLSCP II The International Satellite Land Surface Climatology Project, Initiative II (ISLSCP II) Overview ISLSCP II Logo The International Satellite Land Surface Climatology...

388

LM's New Role for the DOE Title X Reimbursement Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program October 16, 2012 - 10:01am Addthis LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program What does this project do? Goal 4. Optimize the use of land and assets Title X of the Energy Policy Act of 1992 authorized U.S. Department of Energy (DOE) to reimburse licensees of 1 thorium and 13 uranium processing sites (Figure 1) for a portion of their remedial action costs attributable

389

LM's New Role for the DOE Title X Reimbursement Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program October 16, 2012 - 10:01am Addthis LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program What does this project do? Goal 4. Optimize the use of land and assets Title X of the Energy Policy Act of 1992 authorized U.S. Department of Energy (DOE) to reimburse licensees of 1 thorium and 13 uranium processing sites (Figure 1) for a portion of their remedial action costs attributable

390

Harvest Wind Farm II | Open Energy Information  

Open Energy Info (EERE)

II II Facility Harvest Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner John Deere Wind Energy Developer John Deere Wind Energy Energy Purchaser Wolverine Power Cooperative Location Oliver and Chandler Townships MI Coordinates 43.829789°, -83.222872° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.829789,"lon":-83.222872,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

391

Kotzebue Wind Project II | Open Energy Information  

Open Energy Info (EERE)

II II Facility Kotzebue Wind Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Kotzebue Elec. Assoc. Developer Kotzebue Electric Association Energy Purchaser Kotzebue Elec. Assoc. Location Kotzebue AK Coordinates 66.83912°, -162.562816° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":66.83912,"lon":-162.562816,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

392

Stoney Corners II (REpower) | Open Energy Information  

Open Energy Info (EERE)

REpower) REpower) Jump to: navigation, search Name Stoney Corners II (REpower) Facility Stoney Corners II (REpower) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Heritage Sustainable Energy Developer Heritage Sustainable Energy Energy Purchaser Traverse City Light & Power/Detroit Edison Location McBain MI Coordinates 44.209°, -85.275° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.209,"lon":-85.275,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

393

Alta II (Vestas) | Open Energy Information  

Open Energy Info (EERE)

Vestas) Vestas) Jump to: navigation, search Name Alta II (Vestas) Facility Alta II (Vestas) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Terra-Gen Power Developer Terra-Gen Power Energy Purchaser Southern California Edison Co Location Tehachapi Pass CA Coordinates 35.01917213°, -118.3031845° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.01917213,"lon":-118.3031845,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

394

Cabazon Wind Farm II | Open Energy Information  

Open Energy Info (EERE)

Cabazon Wind Farm II Cabazon Wind Farm II Facility Cabazon Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Goldman Sachs/Shell Developer Canon Power Corp. Energy Purchaser L.A. Department of Water Resources Location San Gorgonio CA Coordinates 33.9095°, -116.734° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.9095,"lon":-116.734,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

395

Klondike II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Facility Klondike II Facility Klondike II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer PPM Energy Inc Energy Purchaser Portland General Electric Location Wasco OR Coordinates 45.592556°, -120.590322° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.592556,"lon":-120.590322,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

396

PARS II  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Peck 1.1 5102010 Exercise 6 -Monthly Status screen updated to PARS II 4152010 Version 30-31 Replaced screens and changed text. J. Peck 1.1 5102010 Ex 8 and 9 36-38...

397

Poster Abstract of Seventeenth ARM STM: Sort by Title  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Science Team Meeting 7 Science Team Meeting 2007 Proceedings Proceedings Sorted by Title Proceedings Sorted by Author Proceedings Sorted by Category Cover image Poster Abstract of the Seventeenth Atmospheric Radiation Measurement (ARM) Science Team Meeting ARM-CONF-2007, March 2007 Monterey, California View poster abstract by Author or Category or Title. 10 Years of External Data ABSTRACT, POSTER Ma, L., Wagener, R., Gregory, L., Liang, M., Tilp, A., and Cialella, A. A Comparison of Broad-band Fluxes at the Main and Auxiliary AMF Sites During the RADAGAST Campaign. ABSTRACT, POSTER Settle, J. A Comparison of Cloud Radar Profiles of Cloud Occurrence with MMF Simulated Radar Profiles as a Function of the Large-Scale Atmospheric State ABSTRACT, POSTER Marchand, R., Beagley, N., and Ackerman, T.

398

FUELS NETL Team Technical Coordinator: Dirk Link Name Title  

NLE Websites -- All DOE Office Websites (Extended Search)

NETL Team Technical Coordinator: Dirk Link NETL Team Technical Coordinator: Dirk Link Name Title Affiliation Dogan, Omer N Materials Research Eng NETL Haynes, Daniel ST (Chem Eng) NETL How ard, Bret H Research Chemist NETL Link, Dirk D Research Chemist NETL Morreale, Bryan D General Engineer NETL Poston, James A Physicist NETL Shekhaw at, Dushyant General Engineer NETL Smith, David K Physical Science Tech NETL Sorescu, Dan C Research Physicist NETL Ciocco, Mike Project Lead URS Smith, Mark Project Lead URS Abdelsayed, Victor Research Scientist URS Floyd, Donald Scientist URS Smith, Mark Research Engineer URS Name Project Role Affiliation University Project Title Veser, Goetz PI Pitt Task 221 Development of Catalysts for Coal-gas Component Conversion Enick, Robert M PI Pitt Task 331 Membrane Reaction Process for Conversion of Coal-Gas Components

399

Title: Radar-observed convective characteristics during TWP-ICE  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: Radar-observed convective characteristics during TWP-ICE Title: Radar-observed convective characteristics during TWP-ICE Schumacher, Courtney Texas A&M University Houze, Robert University of Washington May, Peter Bureau or Meteorology Research Centre Frederick, Kaycee Cetrone, Jasmine Vallgren, Andreas Category: Field Campaigns This poster will describe the radar dataset obtained in the Tropical Warm Pool International Cloud Experiment (TWP-ICE), which is to take place 20 January - 14 February 2006 in the vicinity of Darwin, Australia. We will describe the convective systems observed during the project by two scanning C-band Doppler radars, one of which will provide dual-polarization measurements, and ARM's vertically pointing cloud radar and lidar installations. In addition, we will discuss the potential for combining

400

Using EnergyPlus for California Title-24 compliancecalculations  

Science Conference Proceedings (OSTI)

For the past decade, the non-residential portion of California's Title-24 building energy standard has relied on DOE-2.1E as the reference computer simulation program for development as well as compliance. However, starting in 2004, the California Energy Commission has been evaluating the possible use of Energy Plus as the reference program in future revisions of Title-24. As part of this evaluation, the authors converted the Alternate Compliance Method (ACM) certification test suite of 150 DOE-2 files to Energy Plus, and made parallel DOE-2 and Energy Plus runs for this extensive set of test cases. A customized version of DOE-2.1E named doe2ep was developed to automate the conversion process. This paper describes this conversion process, including the difficulties in establishing an apples-to-apples comparison between the two programs, and summarizes how the DOE-2 and Energy Plus results compare for the ACM test cases.

Huang, Joe; Bourassa, Norman; Buhl, Fred; Erdem, Ender; Hitchcock, Rob

2006-08-26T23:59:59.000Z

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

(Revised 09-05-13) TITLE CALL NUMBER  

E-Print Network (OSTI)

2006 Abuelo, El PN 1997 .A284 2003 ACM Siggraph 2004 full conference DVD-ROM T 385 .S53 2004 disc 1-3 #12;4 TITLE CALL NUMBER ACM Siggraph 2005 full conference DVD-ROM T 385 .S53 2005 disc 1-4 Adaptation the Odds: The Artists of "The Harlem Renaissance" N6538 .N5A33 2004 Air, Light, and Utopia: The Modern

Kearfott, R. Baker

402

Locust Ridge II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Locust Ridge II Wind Farm Locust Ridge II Wind Farm Jump to: navigation, search Name Locust Ridge II Wind Farm Facility Locust Ridge II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Gamesa Developer Gamesa Energy Purchaser Hospital Customers Location PA Coordinates 40.7067°, -76.2238° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7067,"lon":-76.2238,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

403

Caprock Wind Ranch phase II | Open Energy Information  

Open Energy Info (EERE)

phase II phase II Jump to: navigation, search Name Caprock Wind Ranch phase II Facility Caprock Wind Ranch phase II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Babcock & Brown Developer Cielo Wind Power Energy Purchaser Xcel Energy Location Quay County NM Coordinates 35.043532°, -103.583422° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.043532,"lon":-103.583422,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

404

FERN Blue Ribbon Wind Farm II* | Open Energy Information  

Open Energy Info (EERE)

II* II* Jump to: navigation, search Name FERN Blue Ribbon Wind Farm II* Facility FERN Blue Ribbon Wind Farm II* Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Developer Fishermen's Energy Location Offshore from Atlantic City NJ Coordinates 39.183°, -74.428° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.183,"lon":-74.428,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

405

Michigan Wind II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Wind II Wind Farm Wind II Wind Farm Jump to: navigation, search Name Michigan Wind II Wind Farm Facility Michigan Wind II Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Exelon Wind Developer Exelon Wind Energy Purchaser Consumers Energy Location Minden City MI Coordinates 43.6572421°, -82.7681278° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.6572421,"lon":-82.7681278,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

406

Buffalo Gap II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Gap II Wind Farm Gap II Wind Farm Jump to: navigation, search Name Buffalo Gap II Wind Farm Facility Buffalo Gap II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Developer AES Corp. Energy Purchaser Direct Energy Location Taylor County TX Coordinates 32.310556°, -100.149167° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.310556,"lon":-100.149167,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

407

Dry Lake II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Dry Lake II Wind Farm Dry Lake II Wind Farm Jump to: navigation, search Name Dry Lake II Wind Farm Facility Dry Lake II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer Iberdrola Renewables Energy Purchaser Salt River Project Location Northwest of Snowflake AZ Coordinates 34.635651°, -110.357351° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.635651,"lon":-110.357351,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

408

Hull Wind II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

II Wind Farm II Wind Farm Jump to: navigation, search Name Hull Wind II Wind Farm Facility Hull II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Hull Municipal Light Department Developer Hull Municipal Light Department Energy Purchaser Hull Municipal Light Department Location Hull MA Coordinates 42.2727°, -70.8597° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.2727,"lon":-70.8597,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

409

Grand Ridge II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

II Wind Farm II Wind Farm Jump to: navigation, search Name Grand Ridge II Wind Farm Facility Grand Ridge II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Energy Purchaser AEP-Appalachian Power Location La Salle County IL Coordinates 41.15496°, -88.750234° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.15496,"lon":-88.750234,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

410

I 95 Landfill Phase II Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Landfill Phase II Biomass Facility Landfill Phase II Biomass Facility Jump to: navigation, search Name I 95 Landfill Phase II Biomass Facility Facility I 95 Landfill Phase II Sector Biomass Facility Type Landfill Gas Location Fairfax County, Virginia Coordinates 38.9085472°, -77.2405153° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.9085472,"lon":-77.2405153,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

411

Storm Lake II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

II Wind Farm II Wind Farm Jump to: navigation, search Name Storm Lake II Wind Farm Facility Storm Lake II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner AES Corp. Developer GE Energy Energy Purchaser Alliant/IES Utilities Location Buena Vista and Cherokee Counties IA Coordinates 42.655334°, -95.383651° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.655334,"lon":-95.383651,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

412

Spirit Lake II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

II Wind Farm II Wind Farm Jump to: navigation, search Name Spirit Lake II Wind Farm Facility Spirit Lake II Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Spirit Lake School Dist Developer Spirit Lake School District Energy Purchaser Spirit Lake School District Location Spirit Lake IA Coordinates 43.411412°, -95.09914° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.411412,"lon":-95.09914,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

413

Smoky Hills II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Smoky Hills II Wind Farm Smoky Hills II Wind Farm Jump to: navigation, search Name Smoky Hills II Wind Farm Facility Smoky Hills II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Enel North America Developer TradeWind Energy Location Lincoln County KS Coordinates 38.886777°, -98.178906° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.886777,"lon":-98.178906,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

414

Story County Wind Project II | Open Energy Information  

Open Energy Info (EERE)

Project II Project II Jump to: navigation, search Name Story County Wind Project II Facility Story County Wind Project II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Location Story & Hardin Counties IA Coordinates 42.301351°, -93.45156° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.301351,"lon":-93.45156,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

415

Salton Sea II Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

Salton Sea II Geothermal Facility Salton Sea II Geothermal Facility General Information Name Salton Sea II Geothermal Facility Facility Salton Sea II Sector Geothermal energy Location Information Address 6920 Lack Rd. Location Calipatria, California Zip 92233 Coordinates 33.157762650311°, -115.64822673798° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.157762650311,"lon":-115.64822673798,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

416

Cedar Creek Wind Farm II (Nordex) | Open Energy Information  

Open Energy Info (EERE)

Farm II (Nordex) Farm II (Nordex) Jump to: navigation, search Name Cedar Creek Wind Farm II (Nordex) Facility Cedar Creek II (Nordex) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner BP Wind Energy Developer BP Wind Energy Energy Purchaser Xcel Energy Location Weld County CO Coordinates 40.874623°, -104.092569° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.874623,"lon":-104.092569,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

417

Lalamilo Wells II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Lalamilo Wells II Wind Farm Lalamilo Wells II Wind Farm Jump to: navigation, search Name Lalamilo Wells II Wind Farm Facility Lalamilo Wells II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Developer Lalamilo Ventures Energy Purchaser Hawaiian Electric Light Co. Location Big Island HI Coordinates 19.9875°, -155.765556° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":19.9875,"lon":-155.765556,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

418

Tres Vaqueros II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Tres Vaqueros II Wind Farm Tres Vaqueros II Wind Farm Jump to: navigation, search Name Tres Vaqueros II Wind Farm Facility Tres Vaqueros II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Developer International Wind Companies Energy Purchaser Pacific Gas & Electric Co Location Altamont Pass CA Coordinates 37.7347°, -121.652° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.7347,"lon":-121.652,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

419

Hopkins Ridge II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Hopkins Ridge II Wind Farm Hopkins Ridge II Wind Farm Jump to: navigation, search Name Hopkins Ridge II Wind Farm Facility Hopkins Ridge II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Puget Sound Energy Developer RES Americas Energy Purchaser Puget Sound Energy Location Columbia County Coordinates 46.408163°, -117.813199° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.408163,"lon":-117.813199,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

420

Top of Iowa II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

of Iowa II Wind Farm of Iowa II Wind Farm Jump to: navigation, search Name Top of Iowa II Wind Farm Facility Top of Iowa II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer Iberdrola Renewables Location Worth County IA Coordinates 43.361088°, -93.294282° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.361088,"lon":-93.294282,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

GEM Resources II Geothermal Facility | Open Energy Information  

Open Energy Info (EERE)

GEM Resources II Geothermal Facility GEM Resources II Geothermal Facility General Information Name GEM Resources II Geothermal Facility Facility GEM Resources II Sector Geothermal energy Location Information Address 3300 East Evan Hewes Highway Location Holtville, California Zip 92250 Coordinates 32.77605344699°, -115.26323318481° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.77605344699,"lon":-115.26323318481,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

422

Kotzebue Wind Project Phase II & III | Open Energy Information  

Open Energy Info (EERE)

II & III II & III Jump to: navigation, search Name Kotzebue Wind Project Phase II & III Facility Kotzebue Wind Project Phase II & III Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Kotzebue Electric Assoc. Developer Kotzebue Electric Association Energy Purchaser Kotzebue Electric Assoc. Location Kotzebue AK Coordinates 66.839104°, -162.556894° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":66.839104,"lon":-162.556894,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

423

Condon Wind Project phase II | Open Energy Information  

Open Energy Info (EERE)

Project phase II Project phase II Jump to: navigation, search Name Condon Wind Project phase II Facility Condon Wind Project phase II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Developer SeaWest Energy Purchaser Bonneville Power Admin Location Gilliam County OR Coordinates 45.306062°, -120.255847° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.306062,"lon":-120.255847,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

424

Top Crop Wind Farm (Phase II) | Open Energy Information  

Open Energy Info (EERE)

(Phase II) (Phase II) Jump to: navigation, search Name Top Crop Wind Farm (Phase II) Facility Top Crop Wind Farm (Phase II) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horizon-EDPR Developer Horizon-EDPR Location Grundy County IL Coordinates 41.202313°, -88.530078° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.202313,"lon":-88.530078,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

425

Wild Horse II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Wild Horse II Wind Farm Wild Horse II Wind Farm Jump to: navigation, search Name Wild Horse II Wind Farm Facility Wild Horse II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Puget Sound Energy Developer Puget Sound Energy Energy Purchaser Puget Sound Energy Location Kittitas County Coordinates 47.000782°, -120.190609° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.000782,"lon":-120.190609,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

426

File:Title V Checklist.pdf | Open Energy Information  

Open Energy Info (EERE)

Title V Checklist.pdf Title V Checklist.pdf Jump to: navigation, search File File history File usage File:Title V Checklist.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 45 KB, MIME type: application/pdf, 7 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:29, 1 November 2012 Thumbnail for version as of 11:29, 1 November 2012 1,275 × 1,650, 7 pages (45 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file.

427

Title I implementation: Status report on nonattainment areas  

SciTech Connect

Key provisions of Title I of the Clean Air Act Amendments of 1990 (CAAA) focus on bringing cities and other areas into attainment of the National Ambient Air Quality Standards for ozone, carbon monoxide (CO), and fine particulates (PM-10). The CAAA's new classification scheme for pollutant nonattainment areas is based on the relative severity of pollution in these areas and determines the stringency of control measures and the dates by which attainment of the standards will be required. The US Environmental Protection Agency's (EPA's) final rule on air quality designations and classifications, published in late 1991, shows that ozone pollution remains a persistent problem; the number of counties that fail to meet the ozone standard has sharply increased since 1987. In contrast, incidence of PM-10 pollution has decreased; many counties have achieved the PM-10 standard since 1987. Nationwide, the number of CO nonattainment areas has increased, though not dramatically. Many of the new Title I requirements focus on the role of nitrogen oxides (NO[sub x]) in the formation of ground-level ozone. In ozone nonattainment areas and ozone transport regions, Title I generally requires major sources of NO[sub x] to have the same control measures as those that apply to major sources of volatile organic compounds (VOCs). This requirement compels state regulators to adopt an integrated VOC/NO[sub x] control strategy. The NO[sub x] emission standards proposed by state regulators are considerably more stringent than those given in federal guidelines. Both the EPA and the states plan to allow the use of multifacility emissions averaging in state NO[sub x] control strategies, thereby providing industry flexibility. Proposed federal Economic Incentive Program (EIP) rules would also allow sources in states with approved EIPs to use mobile source emission reduction credits to meet certain stationary source emission reduction requirements.

Kenkeremath, L.D.; Snyder, T.C.

1993-01-01T23:59:59.000Z

428

Title I implementation: Status report on nonattainment areas  

SciTech Connect

Key provisions of Title I of the Clean Air Act Amendments of 1990 (CAAA) focus on bringing cities and other areas into attainment of the National Ambient Air Quality Standards for ozone, carbon monoxide (CO), and fine particulates (PM-10). The CAAA`s new classification scheme for pollutant nonattainment areas is based on the relative severity of pollution in these areas and determines the stringency of control measures and the dates by which attainment of the standards will be required. The US Environmental Protection Agency`s (EPA`s) final rule on air quality designations and classifications, published in late 1991, shows that ozone pollution remains a persistent problem; the number of counties that fail to meet the ozone standard has sharply increased since 1987. In contrast, incidence of PM-10 pollution has decreased; many counties have achieved the PM-10 standard since 1987. Nationwide, the number of CO nonattainment areas has increased, though not dramatically. Many of the new Title I requirements focus on the role of nitrogen oxides (NO{sub x}) in the formation of ground-level ozone. In ozone nonattainment areas and ozone transport regions, Title I generally requires major sources of NO{sub x} to have the same control measures as those that apply to major sources of volatile organic compounds (VOCs). This requirement compels state regulators to adopt an integrated VOC/NO{sub x} control strategy. The NO{sub x} emission standards proposed by state regulators are considerably more stringent than those given in federal guidelines. Both the EPA and the states plan to allow the use of multifacility emissions averaging in state NO{sub x} control strategies, thereby providing industry flexibility. Proposed federal Economic Incentive Program (EIP) rules would also allow sources in states with approved EIPs to use mobile source emission reduction credits to meet certain stationary source emission reduction requirements.

Kenkeremath, L.D.; Snyder, T.C.

1993-01-01T23:59:59.000Z

429

118 Recent & Best-Selling Titles * Not for sale in Pakistan  

E-Print Network (OSTI)

118 Recent & Best-Selling Titles * Not for sale in Pakistan ** For sale only in the United States PA: 978-0-691-09561-5 #12;Recent & Best-Selling Titles 119 * Not for sale in Pakistan ** For sale

Landweber, Laura

430

Clean Air Act Title V: Knocking on your door  

SciTech Connect

The Clean Air Act Amendments of 1990 made several significant changes in the clean air program. One of the key elements of the Amendments was the inclusion of an operating permit program in Title V. The purpose of the program is to establish a central point for tracking all applicable air quality requirements for every source required to obtain a permit. This article provides a brief description of the most significant provisions. In addition, the subject of permit modification is discussed in some detail.

Hosford, R.B. (B and V Waste Science and Technology Corp., Kansas City, MO (United States))

1993-01-15T23:59:59.000Z

431

PHYS 551 Lecture #27 Title: Tight-Binding  

E-Print Network (OSTI)

PHYS 551 Lecture #27 Title: Tight-Binding Now that we have shown that (~k;~r) = P ~R ei~k~RA(~r ~R-function (~k;~r) must be normalized. Thus Z dV = 1 = j j2 X R X R0 ei~k~R ~R0 Z A(~r ~R0)A(~r ~R)dV Now for each ~R0, the sum over ~R must be the same since the crystal has the same distribution of neighbors

Winokur, Michael

432

Keenan II Wind Facility | Open Energy Information  

Open Energy Info (EERE)

Keenan II Wind Facility Keenan II Wind Facility Jump to: navigation, search Name Keenan II Wind Facility Facility Keenan II Wind Facility Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner CPV Renewable Energy Developer CPV Renewable Energy Company Energy Purchaser Oklahoma Gas & Electric Location 12 miles southwest of Woodward OK Coordinates 36.387336°, -99.450502° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.387336,"lon":-99.450502,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

433

Papalote Creek II | Open Energy Information  

Open Energy Info (EERE)

Papalote Creek II Papalote Creek II Jump to: navigation, search Name Papalote Creek II Facility Papalote Creek II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner E.ON Climate & Renewables North America Developer E.ON Climate & Renewables North America Energy Purchaser Lower Colorado River Authority Location 30 miles north of Corpus Christi in San Patricio County TX Coordinates 28.254569°, -97.40015° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":28.254569,"lon":-97.40015,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

434

North Dakota Wind II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

II Wind Farm II Wind Farm Facility North Dakota Wind II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser Otter Tail Power Coop. Location Edgeley/Kulm ND Coordinates 46.292787°, -98.881638° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.292787,"lon":-98.881638,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

435

Lincoln Wind Energy Facility II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Lincoln Wind Energy Facility II Facility Lincoln Wind Energy Facility Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Lincoln Electric System Developer Lincoln Electric System Energy Purchaser Lincoln Electric System Location Salt Valley north of Lincoln NE Coordinates 40.7649°, -96.7265° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7649,"lon":-96.7265,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

436

Pomeroy II (08) Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Pomeroy II (08) Wind Farm Pomeroy II (08) Wind Farm Facility Pomeroy II (08) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner MidAmerican Energy Developer EnXco Energy Purchaser MidAmerican Energy Location Pocahontas County IA Coordinates 42.570484°, -94.702506° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.570484,"lon":-94.702506,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

437

Lightning Dock II Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Lightning Dock II Geothermal Project Lightning Dock II Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Lightning Dock II Geothermal Project Project Location Information Coordinates 32.346944444444°, -108.70722222222° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.346944444444,"lon":-108.70722222222,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

438

Alta Mesa II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Alta Mesa II Wind Farm Alta Mesa II Wind Farm Facility Alta Mesa II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner SeaWest Developer SeaWest Energy Purchaser Southern California Edison Co Location San Gorgonio CA Coordinates 33.9095°, -116.734° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.9095,"lon":-116.734,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

439

Ridgetop Energy Wind Farm II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Ridgetop Energy Wind Farm II Facility Ridgetop Energy Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Caithness Energy Purchaser Southern California Edison Co Location Tehachapi CA Coordinates 35.07665°, -118.25529° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.07665,"lon":-118.25529,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

440

Wilton Wind Energy Center II I | Open Energy Information  

Open Energy Info (EERE)

Wilton Wind Energy Center II I Wilton Wind Energy Center II I Facility Wilton Wind Energy Center II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer Florida Power & Light Co. Energy Purchaser Basin Electric Location Wilton ND Coordinates 47.128392°, -100.739837° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.128392,"lon":-100.739837,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Neal Hot Springs II Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Neal Hot Springs II Geothermal Project Neal Hot Springs II Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Neal Hot Springs II Geothermal Project Project Location Information Coordinates 44.023055555556°, -117.46° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.023055555556,"lon":-117.46,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

442

Horse Hollow II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Horse Hollow II Wind Farm Horse Hollow II Wind Farm Facility Horse Hollow II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser Market Location Taylor County TX Coordinates 32.243826°, -100.131898° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.243826,"lon":-100.131898,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

443

SEGS II Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

II Solar Power Plant II Solar Power Plant Facility SEGS II Sector Solar Facility Type Concentrating Solar Power Facility Status In Service Owner Cogentrix Developer Luz Location Daggett, California Coordinates 34.862218°, -116.828012° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.862218,"lon":-116.828012,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

444

Panther Creek II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Creek II Wind Farm Creek II Wind Farm Facility Panther Creek II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner E.On Climate & Renewables Developer E.On Climate & Renewables Energy Purchaser N/a Location TX Coordinates 32.201592°, -101.406391° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.201592,"lon":-101.406391,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

445

Buffalo Ridge II Wind Power Project | Open Energy Information  

Open Energy Info (EERE)

Buffalo Ridge II Wind Power Project Buffalo Ridge II Wind Power Project Facility Buffalo Ridge II Wind Power Project Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Iberdrola Renewables Developer Iberdrola Renewables Location Brookings and Deuel counties SD Coordinates 44.55761°, -96.742888° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.55761,"lon":-96.742888,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

446

Southern California Sunbelt Wind Farm II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Southern California Sunbelt Wind Farm II Facility So. Cal. Sunbelt Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Energy Purchaser Southern California Edison Co Location San Gorgonio CA Coordinates 33.9095°, -116.734° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.9095,"lon":-116.734,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

447

Foote Creek Rim II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

II Wind Farm II Wind Farm Facility Foote Creek Rim II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Caithness Developer SeaWest Energy Purchaser Bonneville Power Admin Location Carbon County WY Coordinates 41.663881°, -106.186001° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.663881,"lon":-106.186001,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

448

Fowler Ridge II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Fowler Ridge II Wind Farm Fowler Ridge II Wind Farm Facility Fowler Ridge II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner BP Alternative Energy Developer BP Alternative Energy Energy Purchaser AEP/Vectron Energy Location Benton County IN Coordinates 40.613872°, -87.318692° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.613872,"lon":-87.318692,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

449

Pomeroy II (4Q07) Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Pomeroy II (4Q07) Wind Farm Pomeroy II (4Q07) Wind Farm Facility Pomeroy II (4Q07) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner MidAmerican Energy Developer EnXco Energy Purchaser MidAmerican Energy Location Pocahontas County IA Coordinates 42.570484°, -94.702506° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.570484,"lon":-94.702506,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

450

Milford Wind Corridor Phase II | Open Energy Information  

Open Energy Info (EERE)

Milford Wind Corridor Phase II Milford Wind Corridor Phase II Facility Milford Wind Corridor Phase II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner First Wind Developer First Wind Energy Purchaser Southern California Public Power Authority Location Millard and Beaver County UT Coordinates 38.645608°, -112.878027° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.645608,"lon":-112.878027,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

451

Pioneer Prairie II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Prairie II Wind Farm Prairie II Wind Farm Facility Pioneer Prairie II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horizon Wind Energy Developer Horizon Wind Energy Location Northeastern IA IA Coordinates 43.450321°, -92.551074° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.450321,"lon":-92.551074,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

452

Venture Wind II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Venture Wind II Wind Farm Venture Wind II Wind Farm Facility Venture Wind II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner SeaWest Developer Seawest Energy Purchaser Pacific Gas & Electric Co Location Altamont Pass CA Coordinates 37.7347°, -121.652° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.7347,"lon":-121.652,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

453

Meridian Trust Wind Farm II | Open Energy Information  

Open Energy Info (EERE)

II II Jump to: navigation, search Name Meridian Trust Wind Farm II Facility Meridian Trust Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer Kenetech Windpower Energy Purchaser Southern California Edison Co Location San Gorgonio CA Coordinates 33.9095°, -116.734° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.9095,"lon":-116.734,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

454

Lake Benton II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Lake Benton II Wind Farm Lake Benton II Wind Farm Facility Lake Benton II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser Xcel Energy Location Pipestone County MN Coordinates 44.226606°, -96.225049° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.226606,"lon":-96.225049,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

455

NREL Research Wind Farm II | Open Energy Information  

Open Energy Info (EERE)

Research Wind Farm II Research Wind Farm II Jump to: navigation, search Name NREL Research Wind Farm II Facility NREL Research Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Developer National Renewable Energy Laboratory Location South of Boulder CO Coordinates 39.90849°, -105.223278° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.90849,"lon":-105.223278,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

456

Big Spring II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Big Spring II Wind Farm Big Spring II Wind Farm Facility Big Spring II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Caithness Developer York Research Energy Purchaser TXU Electric & Gas Location Howard County TX Coordinates 32.146715°, -101.398244° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.146715,"lon":-101.398244,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

457

Mountain View Power Partners II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Power Partners II Wind Farm Power Partners II Wind Farm Facility Mountain View Power Partners II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner MDU Resources Developer SeaWest Energy Purchaser L.A. Department of Water Resources Location San Gorgonio CA Coordinates 33.9095°, -116.734° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.9095,"lon":-116.734,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

458

Twin Groves II (07) Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Twin Groves II (07) Wind Farm Twin Groves II (07) Wind Farm Facility Twin Groves II (07) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horizon Wind Energy Developer Horizon Wind Energy Energy Purchaser Constellation Energy Location McLean County IL Coordinates 40.463317°, -88.64753° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.463317,"lon":-88.64753,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

459

Indian Mesa Wind Farm II | Open Energy Information  

Open Energy Info (EERE)

Mesa Wind Farm II Mesa Wind Farm II Jump to: navigation, search Name Indian Mesa Wind Farm II Facility Indian Mesa Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Vestas Developer Great Plains Windpower Location Hansford County TX Coordinates 36.278°, -101.345° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.278,"lon":-101.345,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

460

Meridian Way II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

II Wind Farm II Wind Farm Facility Meridian Way II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Horizon Wind Energy Developer Horizon Wind Energy Energy Purchaser Westar Energy/Empire District Electric Location Cloud County KS Coordinates 39.43274°, -97.545217° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.43274,"lon":-97.545217,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

RECIPIENT:Bowling Green State University STATE: OH PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

', ', , , 1'.1 'Pagf;: 1 of 2 RECIPIENT:Bowling Green State University STATE: OH PROJECT TITLE: Coastal Ohio Wind Project for Reduced Barriers to Deployment of Offshore Wind Energy Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number COP DE-EE0003871 GFO-0003871-001 EE3871 Based on my review oftlle information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.IA), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

462

RECIPIENT:Utah County STATE: UT PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utah County STATE: UT Utah County STATE: UT PROJECT TITLE: EECBG - Utah County Energy Efficiency Retrofits Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-OOOOO13 EEOOOO889 GFO-O000889-002 EEO Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: Cx, EA, EIS APPENDIX AND NUMBER: Description: A11 Technical advice and planning assistance to international, national, state, and local organizations. A9 Information gathering (including, but not limited to, literature surveys, Inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

463

Independence) PROJECT TITLE: Clinton Community Human Service Campus Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Area Substance Abuse Council, Inc (a SEP subrecipient of the Iowa Office of Energy STATE: IA Area Substance Abuse Council, Inc (a SEP subrecipient of the Iowa Office of Energy STATE: IA Independence) PROJECT TITLE: Clinton Community Human Service Campus Project Page 1 of2 Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE FOA 000052 EE0000162 GFO-0000162-015 EE162 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

464

TITLE: Superacid Catalyzed Coal Conversion Chemistry D O E P  

NLE Websites -- All DOE Office Websites (Extended Search)

st and 2nd Quaterly Technical Progress Reports st and 2nd Quaterly Technical Progress Reports TITLE: Superacid Catalyzed Coal Conversion Chemistry D O E / P C / 6 0 8 1 0 ~ T 1 Pis (Authors): George A. Olah DE84 00 9671 INSTITUTION/ORGANIZATION: UNIVERSITY OF SOUTHERN CALIFORNIA '^_ HYDROCARBON RESEARCH INSTITUTE (213) 743 - 5277 CONTRACT NO.: D E - FG 22 - 83 PC 60810 PERIOD OF PERFORMANCE: September 1. 1983 - March 30, 1984 PROGRESS REPORT Project was initiated September 1,1983 and first weeks were devoted to start up. In our laboratories we have previously developed a mild coal conversion process. This involves the use of a superacid system consisting of HF and BF, in presence of hydrogen and/or a hydrogen donor solvent. In order to understand the chemistry involved in the process of depolymerization

465

Notices Title of Collection: Paul Douglas Teacher Scholarship Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Federal Register 5 Federal Register / Vol. 77, No. 35 / Wednesday, February 22, 2012 / Notices Title of Collection: Paul Douglas Teacher Scholarship Program Performance Report. OMB Control Number: 1840-0787. Agency Form Number(s): ED Form 40-31P. Total Estimated Number of Annual Responses: 30. Total Estimated Annual Burden Hours: 360. Abstract: The purpose of this collection is to ensure that state education agencies are monitoring the fulfillment of the scholarship obligations by former Douglas scholars in accordance with legislation and regulations that governed the Paul Douglas Teacher Scholarship Program when the scholarships were granted. The respondents to this collection are former participating state education agencies (SEAs). This performance report is the only vehicle by which

466

RECIPIENT:Chesterfield County PROJECT TITLE: EECBG Lighting Retrofit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chesterfield County Chesterfield County PROJECT TITLE: EECBG Lighting Retrofit Page 1 of2 STATE: VA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000013 DE-EE0000874 GFO-0000874-001 0 Based 011 my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

467

SC e-journals listed alphabetically by title  

Office of Scientific and Technical Information (OSTI)

Journals Alphabetically by Title A - A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Annals of Nuclear Energy Annals of Operations Research Annals of Physics Annals of the History of Computing, IEEE Annals of The ICRP Annals of the Institute of Statistical Mathematics Annual Review of Analytical Chemistry Annual Review of Anthropology Annual Review of Astronomy and Astrophysics Annual Review of Biochemistry Annual Review of Biomedical Engineering Annual Review of Biophysics Annual Review of Cell and Developmental Biology Annual Review of Chemical and Biomolecular Engineering Annual Review of Clinical Psychology Annual Review of Clinical Psychology Annual Review of Computer Science Annual Review of Earth and Planetary Sciences Annual Review of Ecology, Evolution, and Systematics

468

NEPA COMPLIANCE SURVEY J.-1{p Project Information Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

}:- }:- J.-1{p Project Information Project Title: Flowline leak @ 68-66-SX-34 Date: 1/26/2010 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview 011..- 1. What are the environmental Elimination of the flowline@ 68-66- SX-34. Dig up and locate leak. Take p ntaminated soil to land fann and impacts? record in log book. The duration of this project will be approx. 4-days. The equipment to be used is as follows backhoe, and welder. We will be eliminating the flowline and pumping to a tank set on location.So we don't 2. What is the legal location? have any leaks in the Mure. 3. What is the duration of the project? 4. What major equipment will be used if any (work over rig, drilling rig, etc.)? The table below Is to be completed by the Project Lead and nwlewed by the Environmental Specialist and the DOE NEPA

469

TYPES OF COMPLIANCE REQUIREMENTS: CFDA Number Program Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Number Number Program Title Activities Allowed or Unallowed Allowable Costs/Cost Principles Cash Management Davis Bacon Act Eligibility Equipment and Real Property Management Matching, Level of Effort, Earmarking Period of Availability of Federal Funds Procurement/ Suspension/ Debarment Program Income Real Property Acquisition/ Relocation Reporting Subrecipient Monitoring NEPA National Historic Preservation Act Special Tests and Provisions 81.036 Inventions and Innovations Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 81.049 Office of Science Financial Assistance Program Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 81.079 Regional Biomass Energy Programs Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 81.086 Conservation Research and Development Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 81.087 Renewable Energy Research and

470

RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: : Page 1 01 :L RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE: Hull Offshore Wind Research and Development Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number 09EE0000326 DE-EE0000326 GFO-OO00326-001 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution; and

471

Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona: Phase 2, Construction, Subcontract documents: Appendix E, final report. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

Science Conference Proceedings (OSTI)

This appendix discusses Phase II construction and subcontract documents uranium mill site near Tuba City, Arizona. It contains the bid schedule, special conditions, specifications, and subcontract drawings.

Not Available

1989-08-01T23:59:59.000Z

472

Microsoft Word - Title page and disclaimer.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

PROGRESS REPORT PROGRESS REPORT ADVANCED OIL RECOVERY TECHNOLOGIES FOR IMPROVED RECOVERY FROM SLOPE BASIN CLASTIC RESERVOIRS, NASH DRAW BRUSHY CANYON POOL, EDDY COUNTY, NM DOE Cooperative Agreement No. DE-FC-95BC14941 Strata Production Company P.O. Box 1030 Roswell, NM 88202 (505) 622-1127 Date of Report: February 3, 2006 Award Date: September 25, 1995 Actual Completion Date: September 24, 1998 - Budget Period I September 30, 2005 - Budget Period II Name of Project Manager: Mark B. Murphy Contracting Officer's Representative: Dan Ferguson Reporting Period: September 24, 1998 - September 30, 2005 US/DOE Patent Clearance is not required prior to the publication of this document. ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States

473

Section II INT  

NLE Websites -- All DOE Office Websites (Extended Search)

IN (01-12-2010) Title: Standard Terms & Conditions for International Commercial Transactions Owner: Procurement Policy & Quality Dept Initial Release Date: 011210 Page 1 of 6...

474

NEPA REVIEW SCREENING FORM DOE/CX-00088 I. Project Title: CH2f"JHill Plateau Remediation Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Number: 10 Number: NEPA REVIEW SCREENING FORM DOE/CX-00088 I. Project Title: CH2f"JHill Plateau Remediation Company - Cleanup Actions, December 2012 to December 2013 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions. e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation Company (PRC) will be conducting cleanup actions on the Hanford Site in accordance with the categorical exclusion (CX) referenced in 10 CFR 1021, B, CX B6.1 ''Cleanup actions". PRC Projects include all those identified Sections . 3 and J.l4 of the PRC Contract, DE-AC06-08RL14788. Small-scale, short-term cleanup actions, under RCRA, Atomic Energy Act, or other

475

Ii1  

Office of Legacy Management (LM)

-r -r Ii1 5uitc 79% 955 L%fan~Plu,S.W.. Worhingm. D.C.200242134, 7117-03.87.cdy.43 23 September 1987 Mr. Andrew Wallo, III, NE-23 Division of Facility & Site Decommissioning Projects U.S. Department of Energy Germantown, Maryland 20545 Dear Mr. Wallo: ELIMINATION RECOMMENDATION -- COLLEGES AND UNIVtRSITIES The attached elimination recommendation was prepared in accordance.)l- flL.o* with your suggestion during our meeting on 22 September, The recommendat:on y0.0-02 includes 26 colleges and universities identified.in Enclosure 4 to Aerospace letter subject: Status of Actions - FUSRAP Site List, dated i 27 May 1987; three institutions (Tufts College, University of Virginia, ! and the University of Washington) currently identified on the FUSRAP

476

Microsoft Word - FY2009 2010 TITLE X STATUS REPORT Final.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

... D-1 Appendix E: Status of Licensees' Remaining Costs Eligible for Future Claims...E-1 Appendix F: Title X Site Remedial...

477

E-print Network : Main View : Search Results for Title: "Cosmic...  

Office of Scientific and Technical Information (OSTI)

Search: Title: "Cosmic Calibration" Did you mean ? Create new alert from this search New Search | My Selections (0) | | | | Alerts | Source Status Activity Indicator 0 top results...

478

Thesis Title- Wireless Sensor Networking for Intelligent Transportation Systems  

E-Print Network (OSTI)

o My research area is Cyber-Physical Systems (CPS) that are computing systems interacting with physical, real environments. My research includes (i) CPS supporting the safe and efficient driving in transportation systems (e.g., road networks) in real life and (ii) CPS protecting and monitoring efficiently transportation systems (e.g., road networks and subways) and people (e.g., drivers, passengers, and pedestrians) in emergency situations (e.g., wars, accidents, and disasters). o I am leading CPS Laboratory at Sungkyunkwan University:

Advisor Prof; David H. C. Du; Prof Tian He; Advisor Prof; Yanghee Choi; Advisor Prof; Youngik Eom

2001-01-01T23:59:59.000Z

479

Artificial Photosynthesis II -  

NLE Websites -- All DOE Office Websites (Extended Search)

II - Artificial Photosynthesis II - Joint Center for Artificial Photosynthesis (JCAP) Simulations NathanLewis.png Schematic of a photoelectrochemical cell being designed to harness...

480

Financial and Physical Oil Market Linkages II  

Gasoline and Diesel Fuel Update (EIA)

II II September 27, 2012 Department of Energy 1000 Independence Avenue, SW Washington, D.C. 20585 8:00 a.m. Check-in and coffee break 8:45 a.m. Opening remarks by Administrator and introductions of the participants 9:15 a.m. Morning session 1: Price behavior, benchmark spreads, oil futures market participation and trading activities of commodity index traders and physical traders Paper Title: Physical Market Conditions, Paper Market Activity, and the Brent- WTI Spread * Presenter: Michel Robe, American University and CFTC * Discussant: Lutz Kilian, University of Michigan * Questions, answers and discussions by all participants 10:45 a.m. Coffee break 11:00 a.m. Morning session 2: Speculative components and premium in crude oil prices:

Note: This page contains sample records for the topic "umtra title ii" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Energy Unlimited Wind Farm II | Open Energy Information  

Open Energy Info (EERE)

II II Facility Energy Unlimited Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Energy Unlimited Developer Energy Unlimited Energy Purchaser Southern California Edison Co Location San Gorgonio CA Coordinates 33.9095°, -116.734° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.9095,"lon":-116.734,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

482