Powered by Deep Web Technologies
Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

BNL | Graham Smith  

NLE Websites -- All DOE Office Websites (Extended Search)

Graham Smith Graham Smith Graham Smith Head of the Instrumentation Division photo of Graham Smith The mission of the Instrumentation Division, with a staff of around 40, is to develop state-of-the-art instrumentation required for experimental research programs at Brookhaven Lab and elsewhere, and to maintain the expertise and facilities in specialized high technology areas essential for this work. The focus is on three major research areas: radiation detectors (using solid, liquid, or gas media); microelectronics; and laser, optical, and microfabrication applications. Smith's major scientific accomplishments include measuring the fundamental limits of gas-filled detectors, which enables researchers using synchrotron light sources like the NSLS to obtain the highest resolution

2

ROBIN LAMBERT GRAHAM  

NLE Websites -- All DOE Office Websites (Extended Search)

or 1-630-252-6333 (FAX); GrahamRL@ANL.GOV EDUCATI ON: Ph.D. (1982) Forest Ecology, Oregon State University, Corvallis, OR A.B. (1976) Biology, Dartmouth College, Hanover, NH Summa...

3

Davis Graham Stubbs LLP | Open Energy Information  

Open Energy Info (EERE)

Graham Stubbs LLP Graham Stubbs LLP Jump to: navigation, search Name Davis Graham & Stubbs LLP Place Denver, Colorado Zip 80202 Sector Services Product String representation "Davis Graham & ... erse workforce." is too long. Coordinates 39.74001°, -104.992259° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.74001,"lon":-104.992259,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

4

Graham7781's blog | OpenEI Community  

Open Energy Info (EERE)

Graham7781's blog Graham7781's blog Home > Blogs Graham7781's picture Submitted by Graham7781(1992) Super contributor 16 August, 2013 - 12:21 New report from White House outlines largest problems facing United States energy grid energy grid OpenEI President Smart Grid United States White House Graham7781's picture Submitted by Graham7781(1992) Super contributor 15 August, 2013 - 09:09 DOE Report Describes Progress in the Deployment of Synchrophasor Technologies for Improved Grid Operations OpenEI PMU recovery act SGIG Smart Grid Graham7781's picture Submitted by Graham7781(1992) Super contributor 5 August, 2013 - 13:18 Geothermal Regulatory Roadmap featured on NREL Now geothermal NREL OpenEI regulatory roadmap Navigating the complex system of federal and state regulations to secure project approvals is one of the biggest hurdles geothermal power developers

5

User:Graham7781 | Open Energy Information  

Open Energy Info (EERE)

User page User page Edit with form History Facebook icon Twitter icon » User:Graham7781 Jump to: navigation, search Brazil Name Graham Hill Location Denver, Colorado Edits 7932 Friends User Edits GregZiebold 3711 JZ 42 Jorn.Aabakken 5 Rmckeel 1772 Woodjr 59997 Twong 24774 Dbrodt 21 I am a Research Analyst at the National Renewable Energy Laboratory, and a recent graduate of the University of Denver in MAS Environmental Policy and Management. I've been working extensively at NREL on expanding Openei.org by adding contributions, editing and patrolling pages, and developing training tutorial videos to guide users on how to use the wiki. I also have led the creation of the Renewable Energy News Gateway and the Oil and Gas gateway. I've collaborated with Jarett Zuboy (User:JZ) on helping build the external

6

Geothermal development plan: Graham-Greenlee counties  

DOE Green Energy (OSTI)

Geothermal potential in Graham and Greenlee counties both of which contain significant quantities of geothermal energy that could be used for industrial, agricultural or residential use, is described. Projections are made of geothermal heat on line under both private and city-owned utility development. Potential users of geothermal energy, however, are limited since this area is sparsely populated and lacks an industrial base. Only a couple of industries were identified which could use geothermal energy for their process heat needs.

White, D.H.

1981-01-01T23:59:59.000Z

7

Demokratiudvikling og civilsamfundsorganisationer : et casestudie af betydningen af civilsamfundsorganisationers roller i udviklingen af demokrati i Kenya.  

E-Print Network (OSTI)

??Demokratiudvikling og civilsamfundsorganisationer et casestudie af betydningen af civilsamfundsorganisationers roller i udviklingen af demokrati i Kenya. Udgangspunkt for opgaven, er at undersge hvilke roller (more)

Bohn, Nanette Mia

2007-01-01T23:59:59.000Z

8

Geothermal development plan: Graham/Greenlee Counties  

DOE Green Energy (OSTI)

The Graham/Greenlee County Area Development Plan evaluated the region-wide market potential for utilizing geothermal energy. The study identified five potential geothermal resource areas with temperatures less than 100{sup 0}C (212{sup 0}F). In addition, seven areas are inferred to contain higher temperature resources with the Clifton Hot Springs area having electrical potential. Geothermal resources are found to occur near Safford and Clifton, the two major population centers. Future population growth in the two counties is expected to average less than two percent per year over the next 40 years. Growth in the mining, trade and services economic sectors provide opportunities for the direct utilization of geothermal energy. A regional energy use analysis is included containing energy use and price projections. Water supplies are found to be adequate for urban needs, though agricultural and mineral water use may be limited in the future. The study also contains a preliminary economic analysis for two district heating systems as well as a section matching geothermal resources to potential users.

White, D.H.; Goldstone, L.A.

1982-08-01T23:59:59.000Z

9

Ten Weirdest Computers By DUNCAN GRAHAM-ROWE  

E-Print Network (OSTI)

Ten Weirdest Computers By DUNCAN GRAHAM-ROWE April 15, 2008 -- Today's computers use pulses, weirder, ways& 1. Optical computing There's nothing weird about encoding data in light global computations is still not practical. Optical computers are a worthwhile goal because using light could increase

Braun, Paul

10

Graham County Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

Coop Inc Coop Inc Jump to: navigation, search Name Graham County Electric Coop Inc Place Arizona Utility Id 7456 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes Activity Transmission Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Residential: $0.1360/kWh Commercial: $0.1320/kWh Industrial: $0.1140/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=Graham_County_Electric_Coop_Inc&oldid=410754

11

Florence-Graham, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Florence-Graham, California: Energy Resources Florence-Graham, California: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 33.9697897°, -118.2468148° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.9697897,"lon":-118.2468148,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

12

Port Graham, Alaska: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Graham, Alaska: Energy Resources Graham, Alaska: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 59.3513889°, -151.8297222° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":59.3513889,"lon":-151.8297222,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

13

Maricris Mayes, Graham D. Fletcher, Yuri Alexeev Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

and Benchmarking and Benchmarking GAMESS quantum chemistry code on Mira Maricris Mayes, Graham D. Fletcher, Yuri Alexeev Argonne National Laboratory Leadership Computing Facility Mark S. Gordon Iowa State University Outline § Introduction - Motivation - Overview of ab initio MD and quantum chemistry - GAMESS - Fragment Molecular Orbital § Performance on Mira § What is enabled by Mira over Intrepid? § Code Modifications, New Algorithm: RATTLE Towards High-Accurate Predictions of Bulk Properties of Water Motivation: Ø the current state of theory and modeling of water is insufficient Ø structure and dynamics of the H-bonding network in water has not been resolved Towards High-Accurate Predictions of Bulk Properties of Water Plan: Ø perform

14

Certified by: AF/A3O  

E-Print Network (OSTI)

ACCESSIBILITY: Publications and forms are available on the e-Publishing website at www.e-publishing.af.mil for downloading or ordering. RELEASABILITY: There are no releasability restrictions on this publication. OPR: AF/A10-O

unknown authors

2013-01-01T23:59:59.000Z

15

Forgasning af biomasse Den skjulte kemi  

E-Print Network (OSTI)

Forgasning af biomasse Den skjulte kemi Helge Egsgaard Afdelingen for Planteforskning, Forskningscenter Risø Roskilde, Denmark #12;Forgasning af biomasse Biomassens hovedbestanddele · Cellulose · Hemi-cellulose Lignin #12;Forgasning af biomasse Lignin ­ en hypotetisk delstruktur CH HC OH CH3O O CH CH2OH HC O OH CH

16

The Potential for Biomass District Energy Production in Port Graham, Alaska  

SciTech Connect

This project was a collaboration between The Energy & Environmental Research Center (EERC) and Chugachmiut A Tribal organization Serving the Chugach Native People of Alaska and funded by the U.S. Department of Energy (DOE) Tribal Energy Program. It was conducted to determine the economic and technical feasibility for implementing a biomass energy system to service the Chugachmiut community of Port Graham, Alaska. The Port Graham tribe has been investigating opportunities to reduce energy costs and reliance on energy imports and support subsistence. The dramatic rise in the prices of petroleum fuels have been a hardship to the village of Port Graham, located on the Kenai Peninsula of Alaska. The Port Graham Village Council views the forest timber surrounding the village and the established salmon industry as potential resources for providing biomass energy power to the facilities in their community. Benefits of implementing a biomass fuel include reduced energy costs, energy independence, economic development, and environmental improvement. Fish oildiesel blended fuel and indoor wood boilers are the most economical and technically viable options for biomass energy in the village of Port Graham. Sufficient regional biomass resources allow up to 50% in annual heating savings to the user, displacing up to 70% current diesel imports, with a simple payback of less than 3 years for an estimated capital investment under $300,000. Distributive energy options are also economically viable and would displace all imported diesel, albeit offering less savings potential and requiring greater capital. These include a large-scale wood combustion system to provide heat to the entire village, a wood gasification system for cogeneration of heat and power, and moderate outdoor wood furnaces providing heat to 34 homes or community buildings per furnace. Coordination of biomass procurement and delivery, ensuring resource reliability and technology acceptance, and arbitrating equipment maintenance mitigation for the remote village are challenges to a biomass energy system in Port Graham that can be addressed through comprehensive planning prior to implementation.

Charles Sink, Chugachmiut; Keeryanne Leroux, EERC

2008-05-08T23:59:59.000Z

17

NON-RENEWABLE RESOURCE BOOMS AND THE POOR Graham A. Davis1  

E-Print Network (OSTI)

1 NON-RENEWABLE RESOURCE BOOMS AND THE POOR Graham A. Davis1 Division of Economics and Business the level of non-renewable resource extraction and changes in the level of extraction affects the poor. Our," and "make pro-poor forms of growth more difficult" (Ross 2001, p. 16).3 It is well understood that non-renewable

18

AOCS Official Method Af 1-54  

Science Conference Proceedings (OSTI)

Sampling AOCS Official Method Af 1-54 Methods Methods and Analyses Methods Downloads Methods Downloads DEFINITION SCOPE Applicable to flaxseed (see Notes, 2).

19

AOCS Official Method Af 3-54  

Science Conference Proceedings (OSTI)

Oil Content AOCS Official Method Af 3-54 Methods Methods and Analyses Analytical Chemistry Methods Downloads C210BF27896703EB20A63F030A6D6D4D DEFINITION ...

20

Fra affald til bioethanol - forslag til alternativ udnyttelse og hndtering af affald til energiforml.  

E-Print Network (OSTI)

??Specialets overordnede emner er en undersgelse af, hvilke potentialer og muligheder der er for produktion af bioethanol p basis af affald, og hvordan en sdan (more)

Langgaard, Iben

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

2012 SG Peer Review - Expanded Demand Response Functionality - Graham Parker, PNNL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Expanded Demand Response Functionality Expanded Demand Response Functionality Graham Parker Pacific Northwest National Laboratory June 7, 2012 December 2008 Expanded Demand Response Functionality Objectives Life-cycle Funding Summary ($K) Technical Scope (Insert graphic here) * Determine capabilities and customer benefits of smart appliances to mitigate impacts of renewables (PV/wind) and provide ancillary services in partnership with industry and stakeholders. * Advance the business case-from the consumer perspective-for smart appliances and home energy management systems (HEMs). * Assist developing national standardization and regulatory paradigms to enable mass consumer participation. * Model development and GridLAB-D(tm) modeling and analysis of smart appliances

22

The Potential for Biomass District Energy Production in Port Graham, Alaska  

DOE Green Energy (OSTI)

implementing a biomass fuel include reduced energy costs, energy independence, economic development, and environmental improvement. Fish oildiesel blended fuel and indoor wood boilers are the most economical and technically viable options for biomass energy in the village of Port Graham. Sufficient regional biomass resources allow up to 50% in annual heating savings to the user, displacing up to 70% current diesel imports, with a simple payback of less than 3 years for an estimated capital investment under $300,000. Distributive energy options are also economically viable and would displace all imported diesel, albeit offering less savings potential and requiring greater capital. These include a large-scale wood combustion system to provide heat to the entire village, a wood gasification system for cogeneration of heat and power, and moderate outdoor wood furnaces providing heat to 34 homes or community buildings per furnace. Coordination of biomass procurement and delivery, ensuring resource reliability and technology acceptance, and arbitrating equipment maintenance mitigation for the remote village are challenges to a biomass energy system in Port Graham that can be addressed through comprehensive planning prior to implementation.

Charles Sink, Chugachmiut; Keeryanne Leroux, EERC

2008-05-08T23:59:59.000Z

23

The Evolution of Low-Level Rotation in the 29 May 1994 NewcastleGraham, Texas, Storm Complex during VORTEX  

Science Conference Proceedings (OSTI)

This paper reports the results of an analysis of airflow evolution in the tornadic NewcastleGraham, Texas, storm complex of 29 May 1994. A series of seven pseudo-dual-Doppler analyses from 2242 to 2315 are performed from tail radar observations ...

Conrad L. Ziegler; Erik N. Rasmussen; Tom R. Shepherd; Andrew I. Watson; Jerry M. Straka

2001-06-01T23:59:59.000Z

24

Identificering af teknologi gennem narrativer; 3D print.  

E-Print Network (OSTI)

??Denne rapport arbejder med en gennemgang af den skaldte 3D printer teknologi. Denne vil sttes i sammenhng med et teknologifilosofisk form of life ? forstelse (more)

Petersen, Mikael

2011-01-01T23:59:59.000Z

25

Data:Af27066e-af77-4943-adce-cce11610e256 | Open Energy Information  

Open Energy Info (EERE)

e-af77-4943-adce-cce11610e256 e-af77-4943-adce-cce11610e256 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Miami-Cass County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: RATE SCHEDULE GSND-SINGLE PHASE GENERAL SERVICE NON-DEMAND Sector: Commercial Description: The Miami-Cass County Rural Electric Membership Corporation (REMC) shall charge and collect for general service non-demand electric service on the following bases of availability, application, character of service, monthly rate, minimum charge, purchased power cost adjustment clause, and tax adjustment.

26

Data:92e68d5d-af6f-4314-af20-6d7e68dcee18 | Open Energy Information  

Open Energy Info (EERE)

d5d-af6f-4314-af20-6d7e68dcee18 d5d-af6f-4314-af20-6d7e68dcee18 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Burbank Water and Power, California (Utility Company) Effective date: 2012/06/19 End date if known: Rate name: Medium General Service- Three Phase (Special Demand Charge) Sector: Description: The Special Demand charge applies to devices and equipment that produce highly intermittent demands of short duration. These special demand loads include, but are not limited to resistance welding equipment, x-ray machines and bombarding transformers. Source or reference: http://www.burbankwaterandpower.com/electric/commercial-and-industrial-electric-rates

27

Data:Ec70b6df-58d8-452b-a40a-f0bc32af0aef | Open Energy Information  

Open Energy Info (EERE)

df-58d8-452b-a40a-f0bc32af0aef df-58d8-452b-a40a-f0bc32af0aef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Lyndonville, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Load Management (RE) Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

28

Data:Ec5914f7-12af-47cc-8af8-b4c1efdbbaf5 | Open Energy Information  

Open Energy Info (EERE)

914f7-12af-47cc-8af8-b4c1efdbbaf5 914f7-12af-47cc-8af8-b4c1efdbbaf5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Yellowstone R E A, Inc Effective date: 2010/09/14 End date if known: Rate name: Schedule YL - 175 Watt Mercury Vapor light Sector: Lighting Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

29

Data:29e29f7e-56af-45af-b079-9612617f0108 | Open Energy Information  

Open Energy Info (EERE)

f7e-56af-45af-b079-9612617f0108 f7e-56af-45af-b079-9612617f0108 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central New Mexico El Coop, Inc Effective date: End date if known: Rate name: Time of Use Residential Service w/o Electric Thermal Storage (rate 25 OFF) Sector: Residential Description: Any residential consumers without an ETS unit wishing to abide by the on peak off peak hours are eligible. Source or reference: http://cnmec.org/index.php?page=electric-rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

30

Forskere p Ris og DTU har udviklet en metode til fremstilling af bioethanol  

E-Print Network (OSTI)

med halm som råstof. Under processen fremstilles der også biogas som et biprodukt Bruger man biogas i to processer, som udnytter hinandens restprodukter uden at efterlade spildevand af betydning. Vi den nye metode til fremstilling af bioethanol, i en kombination med biogas, er denne

31

Graham7781's blog  

Open Energy Info (EERE)

2 en Suburbs offset Low Carbon 2 en Suburbs offset Low Carbon Footprint of major U.S. Cities http://en.openei.org/community/blog/suburbs-offset-low-carbon-footprint-major-us-cities New research from the University of California-Berkeley shows that those who live in cities in the United States have significantly smaller per-capita carbon footprints than their suburban counterparts. The difference is such that suburban dwellers essentially offset the low carbon footprints of urban dwellers.read more

32

Data:6c090157-d973-44af-af2e-bed1b0127d90 | Open Energy Information  

Open Energy Info (EERE)

0157-d973-44af-af2e-bed1b0127d90 0157-d973-44af-af2e-bed1b0127d90 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbus Southern Power Co Effective date: 2012/03/09 End date if known: Rate name: Residential Optional Demand Service(Load Management Water Heating Energy Charge) Sector: Residential Description: Availability of this provision is limited to those customers served under this provision as of December 31,2000. For residential customers who install a Company-approved load management water heating system which consumes electrical energy primarily during off-peak hours specified by the Company and stores hot water for use during on-peak hours, of minimum capacity of 80 gallons, the last 250 KWH of use in any month shall be billed at the load management water heating energy charge.

33

Data:3afb299a-f590-437a-af7b-510d756d3879 | Open Energy Information  

Open Energy Info (EERE)

afb299a-f590-437a-af7b-510d756d3879 afb299a-f590-437a-af7b-510d756d3879 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wake Electric Membership Corp Effective date: 2012/01/01 End date if known: Rate name: NC GreenPower Sector: Description: * Flat rate buy = ($4.00 per block) / (100 kwh per block) NC GreenPower is an independent, nonprofit organization established to improve North Carolina's environment through voluntary contributions toward renewable energy. A landmark initiative approved by the N.C. Utilities Commission, NC GreenPower is the first statewide green energy program in the nation administered independently by a nonprofit organization and supported by all of the state's utilities. The program is designed to improve the environment by encouraging the development of renewable energy resources through consumers' voluntary contributions to NC GreenPower.For as little as $4 a month, you can help NC GreenPower build up the supply of green energy. Your $4 contribution each month will add one block of 100 kilowatt-hours of green power to the North Carolina power grid.

34

Data:17c9c9ef-1c18-4fd8-af1a-0c4b993dd5af | Open Energy Information  

Open Energy Info (EERE)

ef-1c18-4fd8-af1a-0c4b993dd5af ef-1c18-4fd8-af1a-0c4b993dd5af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Frankfort, Indiana (Utility Company) Effective date: 1997/10/27 End date if known: Rate name: OL Outdoor Lighting 175 watt Mercury Vapor Sector: Lighting Description: Available only for continuous year-round service for outdoor lighting to any residential, farm, commercial, or industrial customer located adjacent to an electric distribution line of utility. Outdoor lighting service using lamps available under this schedule and controlled by a photoelectric relay. Source or reference: http://www.amlegal.com/nxt/gateway.dll/Indiana/frankfort_in/cityoffrankfortindianacodeofordinances?f=templates$fn=default.htm$3.0$vid=amlegal:frankfort_in

35

Data:1024a868-af5f-4450-994a-f94f20b28281 | Open Energy Information  

Open Energy Info (EERE)

4a868-af5f-4450-994a-f94f20b28281 4a868-af5f-4450-994a-f94f20b28281 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Butler Rural El Coop Assn, Inc Effective date: 2009/08/01 End date if known: Rate name: Commercial Large Rates: LOAD CONTROL Sector: Commercial Description: To be eligible for the Load Control Rate, the consumer is required to reduce load (demand) during the months of July and August to no more than 25% of its billing demand in service between the hours of 3:00 p.m. and 9:00 p.m. If metering data indicates that the consumer's load during this period exceeded twenty-five (25%) percent of the monthly billing demand, the Consumer may not be eligible to be billed under this schedule and may be billed under the standard General Service Large rate schedule. The Consumer may request service under this tariff effective July 1 of any year. The Consumer agrees to remain on the tariff for a minimum of 12 months unless the Consumer leaves the Cooperative's lines or is disqualified as mentioned above.

36

Data:F96ac3e8-89af-42ed-af3b-e45b3976a771 | Open Energy Information  

Open Energy Info (EERE)

ac3e8-89af-42ed-af3b-e45b3976a771 ac3e8-89af-42ed-af3b-e45b3976a771 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: GreyStone Power Corporation Effective date: 2011/08/01 End date if known: Rate name: Residential Farm Service Sector: Residential Description: Source or reference: http://www.greystonepower.com/UploadedFiles/pdf/residential%20farm%20service%20rate.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

37

Data:56e44dc6-465e-4aae-af68-4af7ee096040 | Open Energy Information  

Open Energy Info (EERE)

e44dc6-465e-4aae-af68-4af7ee096040 e44dc6-465e-4aae-af68-4af7ee096040 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbia River Peoples Ut Dist Effective date: 2011/10/01 End date if known: Rate name: Outdoor Area Lighting 100w Sodium Vapor Area Light Style Sector: Lighting Description: Applicability To outdoor area lighting service on Customer property. Character of Service Lighting service from dusk to dawn daily, by means of PUD-owned luminaries mounted on PUD-owned poles. Maintenance by the PUD includes lamp, photo cell and fixture replacement as needed. Individual lamps will be replaced on burnout as soon as reasonably possible after notification by the Customer and subject to the PUD's operating schedules and requirements.

38

Data:23b41af2-2415-47d2-bc22-5a97e43af5d5 | Open Energy Information  

Open Energy Info (EERE)

b41af2-2415-47d2-bc22-5a97e43af5d5 b41af2-2415-47d2-bc22-5a97e43af5d5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lexington, North Carolina (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Area Lighting- 400W Metal Halide- Shoe-Box Single Sector: Lighting Description: Available to the individual Customer at locations on the City's distribution system. Source or reference: http://www.lexingtonnc.net/publicutilities/downloads/Current%20Electric%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

39

Data:74af0974-c282-4e32-af9f-5c8cdaee65e6 | Open Energy Information  

Open Energy Info (EERE)

974-c282-4e32-af9f-5c8cdaee65e6 974-c282-4e32-af9f-5c8cdaee65e6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indiana Michigan Power Co (Michigan) Effective date: 2013/01/01 End date if known: Rate name: ECLS - 150 Watt HPS Sector: Lighting Description: Energy Conversation Lighting Service Available for streetlighting service to municipalities, counties, and other governmental subdivisions. This rate is applicable for service that is supplied through new or rebuilt streetlight systems, including extension of streetlighting systems to additional locations where service is requested by customer.

40

Data:145af94d-d25c-47af-9526-54c9b7d74c8e | Open Energy Information  

Open Energy Info (EERE)

d-d25c-47af-9526-54c9b7d74c8e d-d25c-47af-9526-54c9b7d74c8e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sacramento Municipal Utility District Effective date: 2012/01/01 End date if known: Rate name: SL-TSF Sector: Lighting Description: Energy charge only applicable if unit is greater than 70 Watts. Source or reference: https://www.smud.org/en/residential/customer-service/rate-information/rates-rules-regulations.htm Source Parent: Comments FRA= Solar surcharge Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Data:550a4af8-0641-4b10-af62-e97b1098be9d | Open Energy Information  

Open Energy Info (EERE)

0641-4b10-af62-e97b1098be9d 0641-4b10-af62-e97b1098be9d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Security Lighting 175-Watt MVL,One light Sector: Lighting Description: - Available to all consumers located on or adjacent to cooperative's single-phase or three-phase lines. - Subject to power cost adjustment,tax adjustment and rate revisions. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

42

A new antifouling hybrid CDP formulation with ethyl heptanoate: evaluation of AF performance at Ayajin harbor, east coast of Korea  

Science Conference Proceedings (OSTI)

Antifouling (AF) efficiency of a nontoxic aliphatic ester, ethyl heptanoate was evaluated against spores of a fouling alga Ulva pertusa and a ship fouling diatom Amphora coffeaeformis. Based on the nontoxic AF activity exhibited in the laboratory bioassays, ... Keywords: antifouling, ethyl heptanoate, fouling resistance, hybrid controlled depletion paint (CDP), zinc pyrithione

M. Sidharthan; Sang Mok Jung; Haridatta Bhatta Rai; Ji Hyun Lee; Chi Young Lim; Young-Kyu Kang; N. S. Park; H. W. Shin

2006-07-01T23:59:59.000Z

43

ACCESSIBILITY: Acquisition JOINT AIR FORCE-NATIONAL NUCLEAR SECURITY ADMINISTRATION (AF-NNSA) NUCLEAR WEAPONS LIFE CYCLE MANAGEMENT COMPLIANCE WITH THIS PUBLICATION IS MANDATORY  

E-Print Network (OSTI)

This publication is available for downloading or ordering on the e-publishing website at: www.e-publishing.af.mil. RELEASABILITY: There are no releasability restrictions on this publication. OPR: AF/A3/5N-R Certified by: AF/A3/5N

Dr Billy Mullins

2008-01-01T23:59:59.000Z

44

ecap-22-01-28 3..7  

NLE Websites -- All DOE Office Websites (Extended Search)

In these early efforts, switchgrass outperformed most other potential feed- stocks in terms of yields throughout the central and eastern United States (Wright and Turhollow...

45

Data:Af8669e3-923c-4d31-af5d-61eb4e38f8ad | Open Energy Information  

Open Energy Info (EERE)

e3-923c-4d31-af5d-61eb4e38f8ad e3-923c-4d31-af5d-61eb4e38f8ad No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New London Electric&Water Util Effective date: 2009/07/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Primary Metering & Transformer Ownership Discounts Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0699 per kilowatt-hour.

46

Data:36aedabb-8965-49ba-b6af-bec8810857ba | Open Energy Information  

Open Energy Info (EERE)

Data Edit with form History Facebook icon Twitter icon Data:36aedabb-8965-49ba-b6af-bec8810857ba No revision has been approved for this page. It is currently under review by our...

47

Data:32435ebe-89ec-4506-a9af-0575162b3925 | Open Energy Information  

Open Energy Info (EERE)

ebe-89ec-4506-a9af-0575162b3925 ebe-89ec-4506-a9af-0575162b3925 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Pardeeville, Wisconsin (Utility Company) Effective date: 2007/10/10 End date if known: Rate name: Gs-1 General Service Single Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0680 per kilowatt-hour.

48

Data:88278181-5480-404d-8517-770fa69af339 | Open Energy Information  

Open Energy Info (EERE)

78181-5480-404d-8517-770fa69af339 78181-5480-404d-8517-770fa69af339 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota (South Dakota) Effective date: 2013/05/01 End date if known: Rate name: SGS (Small General Service) Sector: Commercial Description: *Available to any non-residential customer for single or three phase electric service supplied through one meter. Source or reference: https://www.xcelenergy.com/staticfiles/xe/Regulatory/Se_Section_5.pdf Source Parent: Comments Applicable to 0kW-25kW Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

49

Data:821153d6-7906-4372-af02-5219546dcf65 | Open Energy Information  

Open Energy Info (EERE)

d6-7906-4372-af02-5219546dcf65 d6-7906-4372-af02-5219546dcf65 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Private Lighting 200 W HPS L-3 Sector: Lighting Description: New Lighting systems shall be overhead construction consisting of wood poles, aerial circuits, and conventional street lighting luminaries with mast arms not longer than ten feet, or floodlighting luminaries with no mast arms. The installed luminaries shall use low-pressure sodium lamps. All equipment used to provide service under this schedule will be furnished, owned, operated and maintained by the Springfield Utility Board.

50

NREL: Energy Analysis - Graham Hill  

NLE Websites -- All DOE Office Websites (Extended Search)

(Krakauer, Bryson, Kerouac) and non-fiction about environment, adventureexploration, history, and science. Printable Version Energy Analysis Home Capabilities & Expertise Key...

51

Robin Graham | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Browse by Topic Browse by Topic Energy Energy efficiency Vehicles Alternative fuels Automotive engineering Biofuels Diesel Fuel economy Fuel injection Heavy-duty vehicles Hybrid & electric vehicles Hydrogen & fuel cells Internal combustion Powertrain research Vehicle testing Building design Manufacturing Energy sources Renewable energy Bioenergy Solar energy Wind energy Fossil fuels Oil Nuclear energy Nuclear energy modeling & simulation Nuclear fuel cycle Geology & disposal Reactors Nuclear reactor safety Nuclear reactor materials Energy usage Energy life-cycle analysis Energy storage Batteries Lithium-ion batteries Lithium-air batteries Smart Grid Energy economy Energy policy Environment Biology Environmental biology Molecular biology Proteomics Environmental science & technology Air quality

52

Data:9813c71c-bcda-47de-8079-2532054440af | Open Energy Information  

Open Energy Info (EERE)

c71c-bcda-47de-8079-2532054440af c71c-bcda-47de-8079-2532054440af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeast Nebraska P P D Effective date: 2013/01/01 End date if known: Rate name: Rate Scheduel WPS-1 - Transmission Substation Sector: Commercial Description: A. This Rate Schedule WPS -1 is available only to municipalities who purchase from the District all of its power and energy requirements (with the exception of any direct Western allocation) for resale, including sales to end-use customers and load growth. B. This Rate Schedule WPS-1 is made available in conjunction with rate schedules that are a part of a Wholesale Power Agreement between the District and Nebraska Electric Generation and Transmission Cooperative, Inc. ("NEG&T"). In the event there is any inconsistency between the provisions of this Rate Schedule WPS -1 and those rate schedules which are a part of the District/NEG&T Wholesale Power Contract, then the provisions of the District/NEG&T Power Contract rate schedules shall govern

53

Data:77783627-d5af-4901-aaf1-164d97736691 | Open Energy Information  

Open Energy Info (EERE)

-d5af-4901-aaf1-164d97736691 -d5af-4901-aaf1-164d97736691 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Cowlitz County Effective date: 2011/11/01 End date if known: Rate name: PRIVATE STREET AND AREA LIGHTING SCHEDULE 10 Sodium Vapor 200 watts Sector: Lighting Description: Applicable to street, roadway, and area lighting for residential and commercial property. SPECIAL CONDITIONS All lighting equipment, including mast arms, brackets, control equipment, transformers, wiring and supports, shall be owned, operated and maintained by the District. For new installations which do not utilize an existing District-owned pole and require the setting of a new pole for the light, the customer shall pay in advance $300 as an Aid-to- Construction. The District will require a Special Contract for service hereunder for a term of not less than sixty (60) consecutive months reflecting monthly payments computed in accordance with this Rate Schedule as it may be amended or superseded.

54

Data:33621295-c71e-4723-b5af-0359f783cccc | Open Energy Information  

Open Energy Info (EERE)

1295-c71e-4723-b5af-0359f783cccc 1295-c71e-4723-b5af-0359f783cccc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stillwater Utilities Authority Effective date: 2012/01/01 End date if known: Rate name: ELECTRIC RATE RESIDENTIAL HEAT PUMP RATE Sector: Residential Description: The application of this rate schedule is limited to residential consumers which use a heat pump for all heating and cooling needs within the residence. Service under this rate requires that the customer must be using a functional heat pump as the primary source of heating and cooling (HVAC) for the residence. Production Cost Adjustment (PCA): a factor determined by SEU and applied to the cost of energy used by the consumer to account for variations in the cost of generating or purchasing power may apply.

55

d. 11. dec. 2003 Moderne bioenergi -et nyt dansk vkstomrde 1 Har forbrnding og forgasning af biomasse en  

E-Print Network (OSTI)

biomasse en fremtid ? Charles Nielsen Elsam A/S #12;d. 11. dec. 2003 Moderne bioenergi - et nyt dansk · Afgrænsning og perspektiv · Den energipolitiske vision · Road-map på biomasse · Drivkræftene på kort sigt · Biomasse - organisk fraktion af affald samt overskud fra land- og skovbrug · Nationalt og internationalt

56

Outage Performance of Dual-Hop AF Relay Channels with Co-Channel Interferences over Rayleigh Fading  

Science Conference Proceedings (OSTI)

This paper studies the outage performance of a dual-hop amplify-and-forward (AF) relay fading channel in an interference-limited environment. The relay and destination nodes are corrupted by multiple co-channel Rayleigh interferences. New exact closed-form ... Keywords: Amplify and-forward relay, Co-channel interference, Nonregenerative relay, Outage probability, Rayleigh fading

Aleksandra M. Cvetkovi?; Dejan N. Mili?; Aleksandar S. Cvetkovi?; Mihajlo Stefanovi?

2013-06-01T23:59:59.000Z

57

Outage probability and channel capacity for the Nth best relay selection AF relaying over INID Rayleigh fading channels  

Science Conference Proceedings (OSTI)

Cooperative diversity systems have recently been proposed as a way to form virtual antenna schemes without utilizing collocated multiple antennas. In this paper, we consider the Nth best opportunistic amplify-and-forward (AF) cooperative diversity ... Keywords: Nth best OAF, INID Rayleigh fading channels, channel capacity, cooperative diversity, outage probability

K. Ko; C. Woo

2012-11-01T23:59:59.000Z

58

Solar-wind protons and heavy ions sputtering of lunar surface materials A.F. Barghouty a,  

E-Print Network (OSTI)

Solar-wind protons and heavy ions sputtering of lunar surface materials A.F. Barghouty a, , F Available online 21 December 2010 Keywords: Solar wind sputtering Lunar regolith KREEP soil Potential a c t Lunar surface materials are exposed to $1 keV/amu solar-wind protons and heavy ions on almost

59

Ann. For. Sci. 66 (2009) 208 Available online at: c INRA, EDP Sciences, 2009 www.afs-journal.org  

E-Print Network (OSTI)

.afs-journal.org DOI: 10.1051/forest/2009001 Original article Biomass component equations for Latin American species procedures Abstract · Studies dealing with the estimation of biomass, site productivity and the contribution number of equations developed to estimate biomass components of trees and shrubs in various ecosystems

Recanati, Catherine

60

Data:33af69f1-4f2b-493c-af6f-b6ae98c699a7 | Open Energy Information  

Open Energy Info (EERE)

f2b-493c-af6f-b6ae98c699a7 f2b-493c-af6f-b6ae98c699a7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy New Orleans Inc Effective date: 2010/10/29 End date if known: Rate name: Municipal building light & power service MB-4 Sector: Lighting Description: This schedule is applicable to the electrical energy requirements of certain municipal buildings situated in the City of the New Orleans, which are the property of and are operated and administrated by the city of New Orleans or any agency thereof, or by the Orleans Parish School Board. Source or reference: www.entergy-neworleans.com/content/price/tariffs/enoi_mb.pdf

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Pages that link to "Data:99623403-8ce8-483f-82af-ef5cae66b9e8...  

Open Energy Info (EERE)

3f-82af-ef5cae66b9e8: View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500) City of Seattle, Washington (Utility Company) ( links) View (previous 50 | next 50) (20 | 50 |...

62

Pages that link to "Data:9fa317b0-1d22-44bc-9318-f01ea4a6f5af...  

Open Energy Info (EERE)

bc-9318-f01ea4a6f5af: View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500) City of Seattle, Washington (Utility Company) ( links) View (previous 50 | next 50) (20 | 50 |...

63

Data:149f102f-73af-4d9a-88dc-58ccb5453652 | Open Energy Information  

Open Energy Info (EERE)

73af-4d9a-88dc-58ccb5453652 73af-4d9a-88dc-58ccb5453652 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Bern, North Carolina (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Street Lighting Service - Post-Mounted 9500 Lumen Sodium Vapor (1 light per 10 customers) - Metal Pole Sector: Lighting Description: Source or reference: www.newbern-nc.org/Elec/documents/SLS32B2009.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

64

Data:7c6c5233-1524-4532-baea-3b1af3dd7127 | Open Energy Information  

Open Energy Info (EERE)

33-1524-4532-baea-3b1af3dd7127 33-1524-4532-baea-3b1af3dd7127 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lansing, Michigan (Utility Company) Effective date: 2011/03/01 End date if known: Rate name: LARGE GENERAL ELECTRIC SERVICE Sector: Industrial Description: This rate is available to any customer desiring secondary voltage for any purpose when the electrical requirements are supplied at one point of delivery through one metering installation and the billing demand is 15 kW or more. The limitation to secondary-voltage service may be waived in instances where the character of the electric load at the premises served has changed substantially. This rate is not available for standby or emergency services.

65

Data:361580db-2792-4d51-b4af-1029be488077 | Open Energy Information  

Open Energy Info (EERE)

80db-2792-4d51-b4af-1029be488077 80db-2792-4d51-b4af-1029be488077 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Butler Public Power District Effective date: 2013/01/01 End date if known: Rate name: Stand By Rate 10 Three Phase Sector: Commercial Description: Source or reference: http://www.butlerppd.com/common/New%20Customer%20Packet%20_1.2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

66

Data:F8667979-6811-4745-af14-b79a47bf3977 | Open Energy Information  

Open Energy Info (EERE)

79-6811-4745-af14-b79a47bf3977 79-6811-4745-af14-b79a47bf3977 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Omaha Public Power District Effective date: 2012/01/01 End date if known: Rate name: CONSUMER OWNED STREET LIGHTING Metal Halide 70 Sector: Lighting Description: CONSUMER OWNED SYSTEM OPERATED BY DISTRICT Source or reference: http://ww3.oppd.com/rates/OppdRateManual.pdf#nameddest=110 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

67

Data:09630002-11af-4337-82dc-80f822e0575f | Open Energy Information  

Open Energy Info (EERE)

02-11af-4337-82dc-80f822e0575f 02-11af-4337-82dc-80f822e0575f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lubbock, Texas (Utility Company) Effective date: 2010/10/29 End date if known: Rate name: GUARD LIGHT SERVICE,150w mv, wood pole Sector: Lighting Description: Each 150 Watt 7,000 lumen (nominal - actual rating may vary) mercury vapor fixture installed on an overhead bracket on a wood pole Source or reference: http://www.lpandl.com/Rates.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

68

Data:52114253-f79c-4e56-af04-23a58ff8fdfc | Open Energy Information  

Open Energy Info (EERE)

253-f79c-4e56-af04-23a58ff8fdfc 253-f79c-4e56-af04-23a58ff8fdfc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Eastern Illinois Elec Coop Effective date: 2013/04/15 End date if known: Rate name: INTERRUPTIBLE AIR CONDITIONING Sector: Commercial Description: This rider is available upon application to any member/owner served under Rates 1, 5, 8, or 20 with a 240 volt central air conditioning system that is capable of being cycled off and on by the installation of a cooperative provided control device. Such systems must be of sufficient size to provide air conditioning to the entire facility where it is located.

69

Data:97199320-92ca-4056-8235-02af2b33d56c | Open Energy Information  

Open Energy Info (EERE)

0-92ca-4056-8235-02af2b33d56c 0-92ca-4056-8235-02af2b33d56c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/02/23 End date if known: Rate name: 14ft foot black fluted poles Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

70

Data:123b8377-6566-4149-af6e-47a669adf9ab | Open Energy Information  

Open Energy Info (EERE)

b8377-6566-4149-af6e-47a669adf9ab b8377-6566-4149-af6e-47a669adf9ab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tecumseh, Nebraska (Utility Company) Effective date: 2013/10/01 End date if known: Rate name: Seasonal Unmetered Service (October 2013) Sector: Commercial Description: Applicable to where customers desire an electric service connection for a very limited time requirement, such as, but not limited to carnivals, the circus, shows, etc, and metering is not feasible. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

71

Data:2657af18-6250-47ef-8647-f8d09f894495 | Open Energy Information  

Open Energy Info (EERE)

af18-6250-47ef-8647-f8d09f894495 af18-6250-47ef-8647-f8d09f894495 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No4 Pinal Cnty Effective date: 2009/01/01 End date if known: Rate name: Residential Rate Sector: Residential Description: Available to residential use only in single private residences or apartments for lighting, appliances domestic single-phase power with no motor over 5 HP, heating and cooking served through one meter. Three-phase service is subject to application. Source or reference: ISU Documentation Source Parent: Comments The bill is subject to a power supply adjuster as set forth in the District's power cost adjuster rate tariff.

72

Data:9576c0dd-6d4a-40af-8560-125902234c79 | Open Energy Information  

Open Energy Info (EERE)

dd-6d4a-40af-8560-125902234c79 dd-6d4a-40af-8560-125902234c79 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Douglas, Georgia (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Security Lights - 400 Watt HPS Vapor - Metered Sector: Lighting Description: Wood Pole Charge - $2.00 Fiberglass Pole - $10.00/fixture for 60 months Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

73

Data:D07856af-8162-4183-be2b-04015925df16 | Open Energy Information  

Open Energy Info (EERE)

af-8162-4183-be2b-04015925df16 af-8162-4183-be2b-04015925df16 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: United Illuminating Co Effective date: 2013/01/01 End date if known: Rate name: Rate MH - Cobra Head 400 Watt Sector: Lighting Description: Source or reference: www.uinet.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

74

Data:2027ba7a-f5bf-4540-b733-b3fe771817ae | Open Energy Information  

Open Energy Info (EERE)

a-f5bf-4540-b733-b3fe771817ae a-f5bf-4540-b733-b3fe771817ae No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp (Tennessee) Effective date: End date if known: Rate name: 200 Watt HPS Sector: Lighting Description: Source or reference: http://www.tcemc.org/index.php/residential-information/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

75

Data:26cacead-02ed-41be-af8e-334e2755b38f | Open Energy Information  

Open Energy Info (EERE)

cacead-02ed-41be-af8e-334e2755b38f cacead-02ed-41be-af8e-334e2755b38f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: M J M Electric Cooperative Inc Effective date: End date if known: Rate name: Large Power (100 KVA & Up 1 Phase) Sector: Commercial Description: Large Power (100 KVA & Up 1 Phase) Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

76

Data:Db084458-5f75-4238-9823-effbb3af25bb | Open Energy Information  

Open Energy Info (EERE)

84458-5f75-4238-9823-effbb3af25bb 84458-5f75-4238-9823-effbb3af25bb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2011/02/01 End date if known: Rate name: Lighting Service--Schedule L-1 HP Sodium Vapor Lamp-Post Top Luminaire (100w) Arlington DBL 12" Sector: Lighting Description: Available to Members, governments, agencies, public and private organizations desiring Electric Delivery or Electric Supply and Delivery Services through unmetered services for roadway and area lighting. Source or reference: http://www.delaware.coop/my-services/residential/billing/rates

77

Data:5213674a-f171-4383-980b-7a41ba0cb264 | Open Energy Information  

Open Energy Info (EERE)

a-f171-4383-980b-7a41ba0cb264 a-f171-4383-980b-7a41ba0cb264 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stanton County Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Commercial Pumping Single Phase Sector: Commercial Description: Source or reference: ISU Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

78

Data:0786987d-7134-4f85-be71-af83f26ddf57 | Open Energy Information  

Open Energy Info (EERE)

7d-7134-4f85-be71-af83f26ddf57 7d-7134-4f85-be71-af83f26ddf57 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Snohomish County PUD No 1 Effective date: 2002/04/01 End date if known: Rate name: 250 WATT MUNICIPAL OWNED STREET LIGHTING SERVICE Sector: Lighting Description: Source or reference: http://www2.snopud.com/site/content/documents/rates/streetlighting_rates010105.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

79

Data:0723832b-93c2-44b4-af87-ef74561b618e | Open Energy Information  

Open Energy Info (EERE)

32b-93c2-44b4-af87-ef74561b618e 32b-93c2-44b4-af87-ef74561b618e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Story City, Iowa (Utility Company) Effective date: 2004/11/01 End date if known: Rate name: Commercial Rate Sector: Commercial Description: monthly CHARGE Is subject to fuel cost and purchase power adjustment Source or reference: Rate Binder# 1B (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

80

Data:16852873-60df-4517-b1fb-0c4dc84af95c | Open Energy Information  

Open Energy Info (EERE)

60df-4517-b1fb-0c4dc84af95c 60df-4517-b1fb-0c4dc84af95c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Small Power Service- Three Phase SP-8 Sector: Commercial Description: Applicable for commercial and farm use for use incidental thereto supplied through one meter at one standard secondary voltage for service up to 50 kVA required transformer capacity. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Data:535499f5-1781-43ad-af7e-714654983b7e | Open Energy Information  

Open Energy Info (EERE)

f5-1781-43ad-af7e-714654983b7e f5-1781-43ad-af7e-714654983b7e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nolin Rural Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Security Lights: Mercury Vapor 175 Watt Sector: Lighting Description: Source or reference: www.nolinrecc.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

82

Data:A3467e96-a8af-4012-9300-52134723b839 | Open Energy Information  

Open Energy Info (EERE)

67e96-a8af-4012-9300-52134723b839 67e96-a8af-4012-9300-52134723b839 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eugene, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Schedule L-4 (Private Property Lighting Service) - 150 Watt High Efficiency High Pressure Sodium Sector: Lighting Description: To overhead outdoor lighting from dusk-to-dawn each day throughout the year for lighting private property with facilities supplied by EWEB. For the purposes of administering this service, the primary references are Eugene Code 9.6725 and all EWEB policies and procedures pertaining to light pollution, light trespass and glare.

83

Data:F36814f9-a2fe-4161-b11c-5635461de1af | Open Energy Information  

Open Energy Info (EERE)

f9-a2fe-4161-b11c-5635461de1af f9-a2fe-4161-b11c-5635461de1af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Potomac Electric Power Co Effective date: 2012/06/01 End date if known: Rate name: Residential Time Metered - Schedule RTM Sector: Residential Description: Source or reference: http://www.pepco.com/_res/documents/DCRates_RTM.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

84

Data:Fa35e236-5399-47eb-af14-d9530988f193 | Open Energy Information  

Open Energy Info (EERE)

36-5399-47eb-af14-d9530988f193 36-5399-47eb-af14-d9530988f193 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Rockwood, Tennessee (Utility Company) Effective date: 2012/12/01 End date if known: Rate name: General (GSA Part 2) Industrial Sector: Industrial Description: * 50 - 1,000 kW Demand; > 15,000 kwh General Power Rate - "applies to the firm power requirements for electric service to commercial, industrial, and governmental customers; institutional customers including but not limited to, churches, clubs, and like customers, except to whom service is available under other resale rate schedules."

85

Data:638af629-a173-45fe-a31c-2ecaca262316 | Open Energy Information  

Open Energy Info (EERE)

af629-a173-45fe-a31c-2ecaca262316 af629-a173-45fe-a31c-2ecaca262316 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Empire District Electric Co (Missouri) Effective date: End date if known: Rate name: COGENERATION PURCHASE RATE Sector: Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

86

Data:6133353e-33af-4276-a282-3daf0dd8a3ba | Open Energy Information  

Open Energy Info (EERE)

53e-33af-4276-a282-3daf0dd8a3ba 53e-33af-4276-a282-3daf0dd8a3ba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bangor Hydro-Electric Co Effective date: 2012/07/01 End date if known: Rate name: Periodic Mercury Vapor-100 watts Sector: Lighting Description: Service under this rate is available for street and area lighting service installations, maintenance and use of energy, and traffic control lighting service provided the customer furnishes the equipment. Customers taking service under this rate schedule are responsible for paying both Distribution Service and Stranded Cost. Source or reference: http://www.bangorhydro.com/business/rates/rates-schedules.aspx

87

Data:4451b404-24fd-4ceb-aab6-934994ce11af | Open Energy Information  

Open Energy Info (EERE)

b404-24fd-4ceb-aab6-934994ce11af b404-24fd-4ceb-aab6-934994ce11af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Area Lighting - MV-L&S (30ftpole) 20000L Sector: Lighting Description: Public Purposes Rider = base rate x %2.85. Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

88

Data:Db239874-2117-4094-9105-d17332e53af8 | Open Energy Information  

Open Energy Info (EERE)

Db239874-2117-4094-9105-d17332e53af8 Db239874-2117-4094-9105-d17332e53af8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jackson Electric Member Corp Effective date: End date if known: Rate name: Outdoor Lighting Decashield MH 250 W Wood Pole Sector: Lighting Description: Source or reference: http://www.jacksonemc.com/business-manage-my-account-commercial-rates-options/schedules/outdoor-lighting-service Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

89

Data:C96c1989-d68c-4373-b9b4-af5833727dbb | Open Energy Information  

Open Energy Info (EERE)

989-d68c-4373-b9b4-af5833727dbb 989-d68c-4373-b9b4-af5833727dbb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Memphis Light, Gas & Water Effective date: 2012/10/01 End date if known: Rate name: GENERAL POWER RATE - PART C Sector: Industrial Description: * This rate shall apply to the firm electric power requirements where a customer's currently effective onpeak or offpeak contract demand, whichever is higher, is greater than 15,000 kW but not more than 25,000 kW; provided that the other conditions of this section are met. Fixed monthly charge = Customer Charge ($1,500) + TVA Administrative Charge ($350)

90

Data:930ed6de-5819-4665-9ffe-db746af9bf10 | Open Energy Information  

Open Energy Info (EERE)

ed6de-5819-4665-9ffe-db746af9bf10 ed6de-5819-4665-9ffe-db746af9bf10 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Yellowstone R E A, Inc Effective date: 2010/09/14 End date if known: Rate name: Schedule YL - Metered Lights (Owned by Consumer) Sector: Lighting Description: These will be charged for energy usage as per the consumer's "A" or "GS-3" rate schedule. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

91

Data:330170f8-bfe2-4835-af2a-c8832115cfdd | Open Energy Information  

Open Energy Info (EERE)

70f8-bfe2-4835-af2a-c8832115cfdd 70f8-bfe2-4835-af2a-c8832115cfdd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Omaha Public Power District Effective date: 2013/01/01 End date if known: Rate name: 236 DUSK TO DAWN LIGHTING 100 Watt Sector: Lighting Description: 100 watt, 7,200 lumen high pressure sodium To all Consumers, for private outdoor lighting service, when such lighting facilities are operated as an extension of the District's distribution system, except for (1) installations on public or semi-public thoroughfares including public parks, where such installations would conflict with a legally constituted public authority having jurisdiction, and (2) athletic fields covered by other rate schedules.

92

Data:603f3abb-4342-429c-978c-0670c88794af | Open Energy Information  

Open Energy Info (EERE)

3f3abb-4342-429c-978c-0670c88794af 3f3abb-4342-429c-978c-0670c88794af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bangor, Wisconsin (Utility Company) Effective date: 2010/05/19 End date if known: Rate name: Gs-1 General Service Three Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 50 kilowatts for three or more months in a consecutive 12-month period.

93

Data:074fdb62-6bca-4596-a287-08000af535fe | Open Energy Information  

Open Energy Info (EERE)

2-6bca-4596-a287-08000af535fe 2-6bca-4596-a287-08000af535fe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers Electric Company, Ltd Effective date: 2010/11/16 End date if known: Rate name: Secure Energy Rate Plan (SERP) Sector: Residential Description: Residential only 12-month contract. Sign up available until May 31, 2007, initiated June 2006 Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

94

Data:9938a3ae-39dd-4803-b189-4195441af5a9 | Open Energy Information  

Open Energy Info (EERE)

ae-39dd-4803-b189-4195441af5a9 ae-39dd-4803-b189-4195441af5a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wells Rural Electric Co Effective date: 2011/10/01 End date if known: Rate name: Security Light- 175 W Sector: Lighting Description: The Seller shall determine the Power Cost Adjustment subject to power supplier charges and credits. Source or reference: http://wrec.coop/info/rates_dyn.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

95

Data:238c150c-4117-4ae5-af40-54579540b808 | Open Energy Information  

Open Energy Info (EERE)

c-4117-4ae5-af40-54579540b808 c-4117-4ae5-af40-54579540b808 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kingfisher, Oklahoma (Utility Company) Effective date: 2003/07/25 End date if known: Rate name: Security Light- With Existing Pole Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

96

Data:791fc044-6654-4af7-8bce-745c676fd797 | Open Energy Information  

Open Energy Info (EERE)

44-6654-4af7-8bce-745c676fd797 44-6654-4af7-8bce-745c676fd797 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Pella, Iowa (Utility Company) Effective date: End date if known: Rate name: Commercial Rate Sector: Commercial Description: Source or reference: www.cityofpella.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

97

Data:12819b61-8fb8-4289-afae-af2425c7504d | Open Energy Information  

Open Energy Info (EERE)

-8fb8-4289-afae-af2425c7504d -8fb8-4289-afae-af2425c7504d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Heartland Rural Elec Coop, Inc Effective date: 2009/08/01 End date if known: Rate name: METERED SECURITY LIGHTING: 175 Watt Mercury Vapor Light Sector: Lighting Description: AVAILABILITY This schedule is available for metered outdoor lighting service to any Customer. New or replacement light installations shall be limited to high pressure sodium and metal-halide lights. Source or reference: http://www.heartland-rec.com/documents/HRECTarriffsAug09web.pdf Source Parent: Comments Applicability

98

Data:C046039e-22be-4017-8930-af61addfd05f | Open Energy Information  

Open Energy Info (EERE)

039e-22be-4017-8930-af61addfd05f 039e-22be-4017-8930-af61addfd05f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp (Tennessee) Effective date: End date if known: Rate name: 400 Watt HPS Sector: Lighting Description: Source or reference: http://www.tcemc.org/index.php/residential-information/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

99

Data:91be1bda-607a-4ff5-9ee9-be98291906af | Open Energy Information  

Open Energy Info (EERE)

be1bda-607a-4ff5-9ee9-be98291906af be1bda-607a-4ff5-9ee9-be98291906af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Walton Electric Member Corp Effective date: 2006/06/01 End date if known: Rate name: Coop Provides Relamping (Traffic Signal) Sector: Lighting Description: Each Additional 60 Watts of demand = $1.79 Source or reference: http://www.waltonemc.com/commercial/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

100

Data:95dad923-e15f-42f4-af2a-847210c9993c | Open Energy Information  

Open Energy Info (EERE)

dad923-e15f-42f4-af2a-847210c9993c dad923-e15f-42f4-af2a-847210c9993c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kings Mountain, North Carolina (Utility Company) Effective date: 2011/07/31 End date if known: Rate name: Outdoor Lighting Service- 175W Mercury Vapor- Suburban, New Pole Sector: Lighting Description: Available to individual customer at locations on the City's distribution system. Source or reference: http://www.cityofkm.com/Downloads/billing/Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Data:7afd7791-aaca-4921-a5af-f9992204eb8d | Open Energy Information  

Open Energy Info (EERE)

afd7791-aaca-4921-a5af-f9992204eb8d afd7791-aaca-4921-a5af-f9992204eb8d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tipton Municipal Electric Util Effective date: 2004/08/13 End date if known: Rate name: Rate F- Street and Highway Lighting: Overhead, 250 Watt Sodium Vapor Sector: Lighting Description: Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

102

Data:71152dce-4bbe-4ac9-89ef-d46218af42ed | Open Energy Information  

Open Energy Info (EERE)

152dce-4bbe-4ac9-89ef-d46218af42ed 152dce-4bbe-4ac9-89ef-d46218af42ed No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sharyland Utilities LP Effective date: End date if known: Rate name: Large Power Primary (Rate Codes 660 and 668) Sector: Commercial Description: This Rate Schedule is applicable to Electric Service for non-residential purposes at primary voltage when such Electric Service is to one Point of Delivery and measured through one Meter. Electric Service will be single or three-phase, 60 hertz, at standard primary voltage. Electric Service will be metered using Company's standard Meter provided for this type of Electric Service. Any Meter other than the standard Meter will be provided at an additional charge. Where Electric Service of the type desired is not available at the Point of Delivery, additional charges and special contract arrangements may be required prior to Electric Service being furnished, pursuant to the Company's Facilities extension policy.

103

Data:6211d159-b8bf-4072-af2e-ead5977c59bc | Open Energy Information  

Open Energy Info (EERE)

1d159-b8bf-4072-af2e-ead5977c59bc 1d159-b8bf-4072-af2e-ead5977c59bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Wheatland, Wyoming (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Irrigation Time-Of-Day Sector: Commercial Description: To irrigators pumping irrigation water. Facilities Charge: $3.39 per Installed HP/Year which is to be billed in July. Source or reference: http://psc.state.wy.us/htdocs/tariffs/wy_whe1/0001a.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

104

Data:152e238b-6601-4370-8af1-8585ebed0cd3 | Open Energy Information  

Open Energy Info (EERE)

e238b-6601-4370-8af1-8585ebed0cd3 e238b-6601-4370-8af1-8585ebed0cd3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Clintonville, Wisconsin (Utility Company) Effective date: 2006/05/05 End date if known: Rate name: Gs-1 General Service Three Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0680 per kWh. See schedule PCAC.

105

Data:1aaf7784-3647-411c-af31-67f6a2567099 | Open Energy Information  

Open Energy Info (EERE)

aaf7784-3647-411c-af31-67f6a2567099 aaf7784-3647-411c-af31-67f6a2567099 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Residential Service - Optional Time-of-Day Three-Phase 7am-7pm Sector: Residential Description: This rate schedule is optional to all Rg-1, Residential Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule. Rg-2 Residential Service Optional TOD $1.00 per customer per month

106

Data:79b3af62-5573-496e-915c-4aaa88cbec22 | Open Energy Information  

Open Energy Info (EERE)

af62-5573-496e-915c-4aaa88cbec22 af62-5573-496e-915c-4aaa88cbec22 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Indiana Pub Serv Co Effective date: 2011/12/27 End date if known: Rate name: Dusk to Dawn Light - 150 watt HPS - Floodlight Sector: Lighting Description: TO WHOM AVAILABLE Available for dusk to dawn area lighting service to Customers for Company-owned lighting systems located on electric supply lines of the Company which are suitable and adequate for supplying the service requested, subject to the conditions set forth in this Rate Schedule and the Company Rules. MAINTENANCE Company will repair and/or replace and maintain all equipment owned by Company which may be necessary to provide a continuous supply of electrical Energy to the point of connection of Company's property

107

Data:23546671-1406-48c9-8470-b7af98806f18 | Open Energy Information  

Open Energy Info (EERE)

1-1406-48c9-8470-b7af98806f18 1-1406-48c9-8470-b7af98806f18 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: UNS Electric, Inc Effective date: 2011/07/01 End date if known: Rate name: RES-01 TOU-A - Residential Time-of-Use, Weekends Off-Peak Sector: Residential Description: Applicable with Rider REST-TS1 and Rider R-2 charges. Available as an optional rate to Customers served under the Company's Pricing Plan RS, Residential Service. This service is normally provided at one point of delivery measured through one meter. More than one service and meter may be provided in instances where such is permitted under 230.2 (A) through (D) of the National Electric Code with prior approval of the Unisource Electric Engineering Department. Service is restricted to private single family dwellings or individually metered apartments.

108

Data:77917991-0154-4342-9d9a-f8afbdc83bc3 | Open Energy Information  

Open Energy Info (EERE)

91-0154-4342-9d9a-f8afbdc83bc3 91-0154-4342-9d9a-f8afbdc83bc3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Potomac Electric Power Co Effective date: End date if known: Rate name: General Service Low Voltage Service - Schedule GSLV Sector: Description: Available for either Standard Offer Service when modified by Rider "SOS" or Distribution Service in the District of Columbia portion of the Company's service area, except if the customer's maximum demand is equal to or in excess of one hundred (100) kilowatts during two (2) or more billing months within twelve (12) consecutive billing months, the customer will be transferred to Schedule "GT LV", "GT 3A", or "GT 3B" in accordance with the availability provisions therein. Rate schedule transfers will be made annually and become effective with the billing month of June. Customers with monthly maximum demands less than 25 kW are served on Schedule "GS ND" subject to the provisions stated therein.

109

Data:6547b862-fa2a-45e9-af24-58380cff0407 | Open Energy Information  

Open Energy Info (EERE)

b862-fa2a-45e9-af24-58380cff0407 b862-fa2a-45e9-af24-58380cff0407 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Russell, Massachusetts (Utility Company) Effective date: 2009/01/01 End date if known: Rate name: LARGE GENERAL SERVICE SCHEDULE LG- FARM DISCOUNT Sector: Industrial Description: Additional Info: Availability: To any non-residential customer having a three phase service. With a consistent demand less than (a) 80kw of demand/per 30 minutes and/or (b) 30,000 kWhr's per month. Includes 10% discount on monthly bill. Minimum Bill: $36.00 Plus $3.60 per kVA for transformer capacity installed if customer exceeds 80kw and/or 30,000kWhr's per month.

110

Data:54dd4786-e976-4995-af31-a16f637583a6 | Open Energy Information  

Open Energy Info (EERE)

e976-4995-af31-a16f637583a6 e976-4995-af31-a16f637583a6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cornell, Wisconsin (Utility Company) Effective date: 2008/05/12 End date if known: Rate name: Cp-1 Large Power Service with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0644 per kilowatt-hour.

111

Data:07644ec7-611f-49fd-af65-e37c44010272 | Open Energy Information  

Open Energy Info (EERE)

ec7-611f-49fd-af65-e37c44010272 ec7-611f-49fd-af65-e37c44010272 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Primary Service - Non-IDR Metered, less than 400 kVa (TC-MGS) - Muni Discount Rate Sector: Commercial Description: Delivery Service will be single or three-phase, 60 hertz, at a standard primary voltage. Delivery Service will be metered using Company's standard Meter provided for this type of Delivery Service. Any Meter other than the standard Meter will be provided at an additional charge and/or will be provided by a Meter Owner other than the Company pursuant to Applicable Legal Authorities. Where Delivery Service of the type desired is not available at the Point of Delivery, additional charges and special contract arrangements may be required prior to Delivery Service being furnished, pursuant to Section 6.1.2.2, Construction Services, of this Tariff.

112

Data:0bbeccfa-2a6a-4f78-af08-e600520765b2 | Open Energy Information  

Open Energy Info (EERE)

bbeccfa-2a6a-4f78-af08-e600520765b2 bbeccfa-2a6a-4f78-af08-e600520765b2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oregon Trail El Cons Coop, Inc Effective date: 2011/10/01 End date if known: Rate name: Irrigation exceeding 17kW, Schedule IR Sector: Industrial Description: This rate is applicable when the monthly demand charge exceeds 17kW. Available in OTEC service territory for agricultural crops, drainage pumping, and stock watering purposes, subject to policies as established by the Board of Directors. Power cost adjustment: The power cost adjustment will follow Bonneville Power Administration's (BPA) temporary charges to OTEC as they adjust their wholesale rates up or down through BPA's Cost Recovery Adjustment Clauses (CRAC). The power cost adjustment will also include future price increases in the cogeneration power purchase contracts.

113

Data:35ba748d-2a52-4aea-8f27-af02790671fb | Open Energy Information  

Open Energy Info (EERE)

2a52-4aea-8f27-af02790671fb 2a52-4aea-8f27-af02790671fb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kenergy Corp Effective date: 2011/09/01 End date if known: Rate name: Light - 400 watt HPS - Contemporary Sector: Lighting Description: APPLICABLE In all territory served. AVAILABILITY OF SERVICE Service under this schedule is offered, under the conditions set out hereinafter, for lighting applications on private property such as, but not Limited to, residential, commercial and industrial plant site or parking lot, other commercial area lighting, etc. to customers now receiving electric service from Kenergy at the same location. Service will be provided under written contract signed by customer prior to service commencing, when facilities are required other than fixture(s).

114

Data:85505044-4615-4682-86f3-1a6b1af6991b | Open Energy Information  

Open Energy Info (EERE)

-4615-4682-86f3-1a6b1af6991b -4615-4682-86f3-1a6b1af6991b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Cp-1 Small Power Service Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

115

Data:F5a595fd-b085-4930-8322-af642236eee5 | Open Energy Information  

Open Energy Info (EERE)

5fd-b085-4930-8322-af642236eee5 5fd-b085-4930-8322-af642236eee5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Medford, Wisconsin (Utility Company) Effective date: 1997/06/27 End date if known: Rate name: Ms-1 Street Lighting Service 250 W HPS Sector: Lighting Description: The schedule will be applied to municipal street lighting. The utility will furnish, install and maintain street lighting units. Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0351 per kilowatt-hour. Fixed Monthly Charge includes Commitment to Community Rider:$12.50 per customer per month.

116

Data:950109f7-27af-4032-b7c1-c80a1592baff | Open Energy Information  

Open Energy Info (EERE)

9f7-27af-4032-b7c1-c80a1592baff 9f7-27af-4032-b7c1-c80a1592baff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeast Nebraska P P D Effective date: 2013/01/01 End date if known: Rate name: Rate Scheduel WPS-1 - Transmission Lines Sector: Commercial Description: A. This Rate Schedule WPS -1 is available only to municipalities who purchase from the District all of its power and energy requirements (with the exception of any direct Western allocation) for resale, including sales to end-use customers and load growth. B. This Rate Schedule WPS-1 is made available in conjunction with rate schedules that are a part of a Wholesale Power Agreement between the District and Nebraska Electric Generation and Transmission Cooperative, Inc. ("NEG&T"). In the event there is any inconsistency between the provisions of this Rate Schedule WPS -1 and those rate schedules which are a part of the District/NEG&T Wholesale Power Contract, then the provisions of the District/NEG&T Power Contract rate schedules shall govern

117

Data:143cc353-3145-4d89-af1c-f5761280cfad | Open Energy Information  

Open Energy Info (EERE)

53-3145-4d89-af1c-f5761280cfad 53-3145-4d89-af1c-f5761280cfad No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kiel, Wisconsin (Utility Company) Effective date: 2011/05/06 End date if known: Rate name: Rg-1 Residential Service Three Phase with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0754 per kilowatt-hour.

118

Data:22824429-7771-47b5-8e7f-4773db5810af | Open Energy Information  

Open Energy Info (EERE)

29-7771-47b5-8e7f-4773db5810af 29-7771-47b5-8e7f-4773db5810af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Santee Electric Coop, Inc Effective date: 2010/11/01 End date if known: Rate name: Area Lighting Service 320w Metal Halide Flood Sector: Lighting Description: This Schedule is available for the leasing of mercury vapor; metal halide and sodium vapor outdoor lighting units to any member/owner served by the Cooperative and subject to established Service Rules and Regulations. Extra charges - Dedicated Poles 30' Wood $2.00 35' Wood $4.00 40' Wood $5.00 45' Wood $6.00 30' to 45' Fiberglass or Metal Pole $16.17

119

Data:80647cc6-75af-4431-aafb-6c457d716ba0 | Open Energy Information  

Open Energy Info (EERE)

cc6-75af-4431-aafb-6c457d716ba0 cc6-75af-4431-aafb-6c457d716ba0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconto Falls Water & Light Comm Effective date: 2010/10/13 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 8am-8pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0847 per kilowatt-hour.

120

Graham-Little-Piccardi-Lassueur syndrome  

E-Print Network (OSTI)

hydroxychloroquine, doxycycline, and tacrolimus ointment.hydroxychloroquine and doxycycline. References 1. Ghislain

Vashi, Neelam; Newlove, Tracey; Chu, Julie; Patel, Rishi; Stein, Jennifer

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Data:774c1c10-6af4-4ab3-b4e3-8cb58ee3628d | Open Energy Information  

Open Energy Info (EERE)

kWh << Previous 1 2 3 Next >> Retrieved from "http:en.openei.orgwindex.php?titleData:774c1c10-6af4-4ab3-b4e3-8cb58ee3628d&oldid633995" Category: Utility Rates What links...

122

Data:6640743e-3b4e-4af1-a21f-4c3abbb26646 | Open Energy Information  

Open Energy Info (EERE)

kWh << Previous 1 2 3 Next >> Retrieved from "http:en.openei.orgwindex.php?titleData:6640743e-3b4e-4af1-a21f-4c3abbb26646&oldid661618" Category: Utility Rates What links...

123

Data:4fea4549-9118-423a-af1d-f64ddcee4065 | Open Energy Information  

Open Energy Info (EERE)

fea4549-9118-423a-af1d-f64ddcee4065 fea4549-9118-423a-af1d-f64ddcee4065 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Black River Falls, Wisconsin (Utility Company) Effective date: 2010/04/15 End date if known: Rate name: General Service - Gs-1 Three Phase Sector: Commercial Description: Power Cost Adjustment Clause All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The current cost per kilowatt-hour of energy billed is equal to the cost of power purchased for the most recent month, divided by the kilowatt-hours of energy sold. The monthly adjustment (rounded to the nearest one one-hundredth of a cent) is equal to the current cost less the base cost. The base cost of power (U) is $0.0790 per kilowatt-hour. Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 50 kilowatts for three or more months in a consecutive 12-month period. Commitment to Community rider:Gs-1 General Service 3.0% of the total electric bill not to exceed $1.66

124

Afprvning af leverance af reguleringsydelser fra et  

E-Print Network (OSTI)

anlæg baseret på · 80 kW mikrogasturbine · UPS/inverter system · Absorption Chiller system Mikrogasturbinesystemet er et standard system men modificeret på følgende punkter: · Generator for optimal tilpasning til

125

Data:B6739a00-6c0a-4e2d-af8a-21e9d0093040 | Open Energy Information  

Open Energy Info (EERE)

39a00-6c0a-4e2d-af8a-21e9d0093040 39a00-6c0a-4e2d-af8a-21e9d0093040 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mascoutah, Illinois (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Municipal Street Lighting Service- Rate 6: Sodium Vapor, 15000 Lumen, 150 watts, Class C Sector: Lighting Description: Class C: Mercury Vapor Lamps or Sodium Vapor Lamps on standard overhead concrete pole construction or on existing metal pole construction, owned and operated by utility. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments

126

Data:Bddb7e17-417f-436f-af6f-2b2b21d5413c | Open Energy Information  

Open Energy Info (EERE)

Bddb7e17-417f-436f-af6f-2b2b21d5413c Bddb7e17-417f-436f-af6f-2b2b21d5413c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kings Mountain, North Carolina (Utility Company) Effective date: 2011/07/31 End date if known: Rate name: Outdoor Lighting Service- 250W High Pressure Sodium- Urban, New Pole Sector: Lighting Description: Available to individual customer at locations on the City's distribution system. Source or reference: http://www.cityofkm.com/Downloads/billing/Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

127

Data:07fc7b3b-bd11-448e-8dbb-b764653af78c | Open Energy Information  

Open Energy Info (EERE)

b3b-bd11-448e-8dbb-b764653af78c b3b-bd11-448e-8dbb-b764653af78c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Ellaville, Georgia (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Security Lighting Service 175 W MV Sector: Lighting Description: To unmetered dusk-to-down electric service used for illuminating public thoroughfares and private outdoor areas,including, but not limited to ,roadways,parking lots and yards. Source or reference: Rate Binder#2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

128

Data:Ff89a9af-335c-4bb5-8ce0-f15e16e775e7 | Open Energy Information  

Open Energy Info (EERE)

af-335c-4bb5-8ce0-f15e16e775e7 af-335c-4bb5-8ce0-f15e16e775e7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Drexel, North Carolina (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Residential- All Electric Sector: Residential Description: Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

129

Data:98833926-486c-49bc-99f4-2ef19af424d2 | Open Energy Information  

Open Energy Info (EERE)

26-486c-49bc-99f4-2ef19af424d2 26-486c-49bc-99f4-2ef19af424d2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Interstate Power and Light Co Effective date: 2011/02/25 End date if known: Rate name: Street Lighting Service (67 KWH) Sector: Lighting Description: Available to municipalities, Iowa Department of Transportation, county governments, and other public bodies for the lighting of public highways, streets, alleys, and other thoroughfares. A proper written request from the municipality or government body is required prior to installation. Service hereunder is also subject to Company's Rules and Regulations.

130

Data:91ac7baa-aa2c-4b87-af7c-98482d55cbc5 | Open Energy Information  

Open Energy Info (EERE)

baa-aa2c-4b87-af7c-98482d55cbc5 baa-aa2c-4b87-af7c-98482d55cbc5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Membership Corporation Effective date: 2009/07/01 End date if known: Rate name: OUTDOOR LIGHTING SERVICE Sodium Vapor, Flood w/pole 250 W Sector: Lighting Description: 28,000 Lumens, 250 W Availability - Available to individual consumers, in all territory served by the Cooperative, for purposes of lighting private outdoor areas or residential subdivision streets from dusk to dawn. Service under this schedule is subject to the Cooperative's established Service Rules and Regulations.

131

Data:0b6480a2-5144-4115-bda0-6f8af4231cab | Open Energy Information  

Open Energy Info (EERE)

80a2-5144-4115-bda0-6f8af4231cab 80a2-5144-4115-bda0-6f8af4231cab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/02/23 End date if known: Rate name: 12000 lumen 294 watt MV (limited) Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

132

Data:14234af0-0c16-40c2-9cdb-bdbb029940fb | Open Energy Information  

Open Energy Info (EERE)

af0-0c16-40c2-9cdb-bdbb029940fb af0-0c16-40c2-9cdb-bdbb029940fb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: North Central Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: 13- Irrigation - 3 Day Control & Sunday Control Sector: Commercial Description: demand= 22.56/.746=30.29 Source or reference: http://www.ncppd.com/rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

133

Data:145fc303-7af3-41d6-9477-84efc52d95d7 | Open Energy Information  

Open Energy Info (EERE)

7af3-41d6-9477-84efc52d95d7 7af3-41d6-9477-84efc52d95d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Frankfort, Kentucky (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Area Lighting- (400W MH With 35' Wood Pole) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

134

Data:227ed93c-0906-4970-aa9a-f635dee8da0e | Open Energy Information  

Open Energy Info (EERE)

227ed93c-0906-4970-aa9a-f635dee8da0e 227ed93c-0906-4970-aa9a-f635dee8da0e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Valley Energy Inc Effective date: 2013/10/01 End date if known: Rate name: L-1 Street and Yard Light Service-175W Sodium Vapor Sector: Lighting Description: Source or reference: http://www.lvenergy.com/my-account/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

135

Data:307f8071-848f-416c-a229-fa57fe3af921 | Open Energy Information  

Open Energy Info (EERE)

f8071-848f-416c-a229-fa57fe3af921 f8071-848f-416c-a229-fa57fe3af921 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bandon, Oregon (Utility Company) Effective date: End date if known: Rate name: Public Authority Large Commercial Single Phase- Inside City Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

136

Data:774050f6-4fcb-41af-9621-93a5ac4554f7 | Open Energy Information  

Open Energy Info (EERE)

-4fcb-41af-9621-93a5ac4554f7 -4fcb-41af-9621-93a5ac4554f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: End date if known: Rate name: Electricity Area Lighting Rates (55 LPS Private Area Lighting) Sector: Commercial Description: Source or reference: http://publicutilities.columbus.gov/uploadedFiles/Public_Utilities/Document_Library/Residential_Bills_and_Payments/2011_Rates_and_Information/Electricity%20Area%20Lighting%20Rates%202011.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

137

Data:D79e805d-67f6-42d2-beda-5af67f9bd4db | Open Energy Information  

Open Energy Info (EERE)

5d-67f6-42d2-beda-5af67f9bd4db 5d-67f6-42d2-beda-5af67f9bd4db No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Middle Georgia El Member Corp Effective date: End date if known: Rate name: General Service- Not Metered Sector: Commercial Description: Source or reference: http://www.mgemc.com/rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

138

Data:Ecda8dc5-4192-4902-af6a-1e84e7565a90 | Open Energy Information  

Open Energy Info (EERE)

Ecda8dc5-4192-4902-af6a-1e84e7565a90 Ecda8dc5-4192-4902-af6a-1e84e7565a90 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York Power Authority Effective date: 2013/07/01 End date if known: Rate name: 40 Sector: Commercial Description: Firm pumped-storage power and energy service Source or reference: http://www.nypa.gov/about/documents.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

139

Data:E3a146e3-18e6-4649-8091-b50af3502021 | Open Energy Information  

Open Energy Info (EERE)

a146e3-18e6-4649-8091-b50af3502021 a146e3-18e6-4649-8091-b50af3502021 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Paris, Tennessee (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: Residential Rate- RS Sector: Residential Description: This rate shall apply to electric service to a single family dwelling where the major use of electricity is for domestic purposes such as lighting, household appliances, and the personal comfort and convenience of those residing therein. Source or reference: ISU Documentation Rate Binder Ted #11 Source Parent: Comments Applicability

140

Data:Cd3fb4cf-6c67-4e83-9af7-f471247eaffb | Open Energy Information  

Open Energy Info (EERE)

cf-6c67-4e83-9af7-f471247eaffb cf-6c67-4e83-9af7-f471247eaffb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Detroit Edison Co Effective date: 2011/11/21 End date if known: Rate name: Alternative Electric Metal Melting 120 kv Transmission Sector: Industrial Description: Source or reference: www.dteenergy.com/pdfs/detroitEdisonTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Data:5b09eab4-b181-4d4a-848f-4af77994e912 | Open Energy Information  

Open Energy Info (EERE)

eab4-b181-4d4a-848f-4af77994e912 eab4-b181-4d4a-848f-4af77994e912 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bloomer Electric & Water Co Effective date: 1999/09/15 End date if known: Rate name: Ms-1 Siren and Lighting Service: Street Lighting 175W MV Sector: Lighting Description: This schedule will be applied to municipal street lighting, siren units, field lighting, and yard lighting Fixed Monthly Charge includes Commitment to Community Rider: $1.33 per customer per month. Power Cost Adjustment varies monthly. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=580

142

Data:B721e2af-e511-4bf7-bf2d-9e83abe831c2 | Open Energy Information  

Open Energy Info (EERE)

e2af-e511-4bf7-bf2d-9e83abe831c2 e2af-e511-4bf7-bf2d-9e83abe831c2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Tennessee (Utility Company) Effective date: 2011/04/01 End date if known: Rate name: Seasonal Demand, Manufacturing Service Rate-- Schedule SMSC Sector: Commercial Description: Source or reference: http://www.clevelandutilities.com/PDF/2011JulyElectricRates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

143

Data:9a9d5a49-af56-48d8-93fd-94678597d683 | Open Energy Information  

Open Energy Info (EERE)

9-af56-48d8-93fd-94678597d683 9-af56-48d8-93fd-94678597d683 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Schuyler, Nebraska (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Rate Schedule 80- Municpal Service Sector: Commercial Description: To City of Schuyler and Schuyler Department of Utilities which are supported directly from local taxes or rate revenue, single- and three-phase service at standard secondary voltages, which is supplied through a single meter. Source or reference: http://schuylerdevelopment.net/storage/Electric_Rates_2013.pdf Source Parent:

144

Data:3e2f7cbf-b9ed-4845-af67-cb3ac09eeb51 | Open Energy Information  

Open Energy Info (EERE)

cbf-b9ed-4845-af67-cb3ac09eeb51 cbf-b9ed-4845-af67-cb3ac09eeb51 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Pardeeville, Wisconsin (Utility Company) Effective date: 2007/10/10 End date if known: Rate name: Cp-1 Small Power Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0680 per kilowatt-hour.

145

Data:749fbfcb-a56a-4f98-b5f7-02d31b37af83 | Open Energy Information  

Open Energy Info (EERE)

fbfcb-a56a-4f98-b5f7-02d31b37af83 fbfcb-a56a-4f98-b5f7-02d31b37af83 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: 100W HPS-Open, UNDERGROUND WIRING,Metal Pole (kWh - 5, Consumers Per Light - 8) Sector: Lighting Description: Applicable to street and highway lighting owned by federal, state, or local governments or agencies thereof and to street lighting in residential subdivisions, apartment or condominium complexes, and mobile home parks by ballast operated vapor light fixtures and poles conforming to the Cooperative's specifications.

146

Data:Fc88fc03-be90-48af-9e01-1cd976b98236 | Open Energy Information  

Open Energy Info (EERE)

fc03-be90-48af-9e01-1cd976b98236 fc03-be90-48af-9e01-1cd976b98236 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- (1000W SV Directional Flood Lighting on existing 45 ft. metal Pole- Underground Wiring) Sector: Lighting Description: This rate schedule is available on an annual basis to any customer for illumination of outdoor areas. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

147

Data:28ef6517-4f04-4e1f-acd2-f6bda425af4c | Open Energy Information  

Open Energy Info (EERE)

-4f04-4e1f-acd2-f6bda425af4c -4f04-4e1f-acd2-f6bda425af4c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: 100W HPS-Open, UNDERGROUND WIRING, Wood Pole (kWh - 10, Consumers Per Light - 4) Sector: Lighting Description: Applicable to street and highway lighting owned by federal, state, or local governments or agencies thereof and to street lighting in residential subdivisions, apartment or condominium complexes, and mobile home parks by ballast operated vapor light fixtures and poles conforming to the Cooperative's specifications.

148

Data:5af0e7c4-a920-461d-95f0-cf155955dc16 | Open Energy Information  

Open Energy Info (EERE)

af0e7c4-a920-461d-95f0-cf155955dc16 af0e7c4-a920-461d-95f0-cf155955dc16 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wright-Hennepin Coop Elec Assn Effective date: End date if known: Rate name: Commercial and Industrial Time-of-Use Service Program Sector: Commercial Description: This rider will be available upon request as a modification of the CI rate when significant Off-Peak usage exists. If a member selects billing under this rider, they must remain on it for a minimum of 12 months. Source or reference: www.whe.org/assets/documents/Commerical Rate Schedule.pdf Source Parent: Comments

149

Data:F0fa5450-6dff-4e27-af89-4a9aa964001e | Open Energy Information  

Open Energy Info (EERE)

450-6dff-4e27-af89-4a9aa964001e 450-6dff-4e27-af89-4a9aa964001e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rolling Hills Electric Coop Effective date: 2010/07/01 End date if known: Rate name: Private Street and Area Lighting (PSL-10) Unmetered HPS 200W Sector: Lighting Description: http://rollinghills.coopwebbuilder.com/sites/rollinghills.coopwebbuilder.com/files/rate_tariffs.pdf Source or reference: http://rollinghills.coopwebbuilder.com/sites/rollinghills.coopwebbuilder.com/files/rate_tariffs.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

150

Data:75af5b44-ce37-4c3e-95a7-c13c677373ca | Open Energy Information  

Open Energy Info (EERE)

af5b44-ce37-4c3e-95a7-c13c677373ca af5b44-ce37-4c3e-95a7-c13c677373ca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Albemarle Electric Member Corp Effective date: 2012/06/01 End date if known: Rate name: Outdoor Security Lighting - 150 watt HPS - Ornamental Cobra Sector: Lighting Description: * Single-phase, 60-cycle alternating current, providing service to automatically controlled dusk-to-dawn lighting, using either the Cooperative's standard fixtures on a new or existing pole or one of the Cooperative's standard ornamental lighting packages. Source or reference: http://www.albemarle-emc.com/Documents/rateschedule.pdf

151

Data:550b6bb9-703e-4359-9728-2ac4be56af10 | Open Energy Information  

Open Energy Info (EERE)

bb9-703e-4359-9728-2ac4be56af10 bb9-703e-4359-9728-2ac4be56af10 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shelby Energy Co-op, Inc Effective date: 1997/06/04 End date if known: Rate name: Large Industrial Rate - Schedule B2 Sector: Industrial Description: Demand Charge Per KW For Billing Demand In Excess Of Contract Demand $8.98 Source or reference: http://www.shelbyenergy.com/yourelectricrate.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

152

Data:9f2fff50-fae9-4a18-b659-7d4f07716af1 | Open Energy Information  

Open Energy Info (EERE)

fff50-fae9-4a18-b659-7d4f07716af1 fff50-fae9-4a18-b659-7d4f07716af1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers Electric Company, Ltd Effective date: 2012/06/01 End date if known: Rate name: Security Lights- 250W Metal Halide Sector: Lighting Description: Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

153

Data:643b2c4b-9492-4af4-87c5-3967de1f5305 | Open Energy Information  

Open Energy Info (EERE)

c4b-9492-4af4-87c5-3967de1f5305 c4b-9492-4af4-87c5-3967de1f5305 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2012/11/09 End date if known: Rate name: Price Schedule - LHS Large General Service with Electric Space Heating at Primary Voltage Sector: Commercial Description: Source or reference: www.midamericanenergy.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

154

Data:Bc5978a3-128f-47ea-af8f-4fd11673a76d | Open Energy Information  

Open Energy Info (EERE)

a3-128f-47ea-af8f-4fd11673a76d a3-128f-47ea-af8f-4fd11673a76d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Leigh, Nebraska (Utility Company) Effective date: 2013/01/15 End date if known: Rate name: District Owned Lighting EWN27500 Sector: Commercial Description: Source or reference: http://www.loup.com/docs/customersvc/LLS-Rates2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

155

Data:462d4ec7-b04f-49ef-81ee-e915945af04e | Open Energy Information  

Open Energy Info (EERE)

ec7-b04f-49ef-81ee-e915945af04e ec7-b04f-49ef-81ee-e915945af04e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maine Public Service Co Effective date: 2012/01/01 End date if known: Rate name: Outdoor Lighting Service-Wooden Poles (30' length) (T) Sector: Lighting Description: This rate is available to any customer for non-metered outdoor lighting service. Source or reference: http://www.mainepublicservice.com/media/40542/rate%20t%20010112.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

156

Data:Bcb8a58c-2869-4846-8fbb-828a6a6f50af | Open Energy Information  

Open Energy Info (EERE)

a58c-2869-4846-8fbb-828a6a6f50af a58c-2869-4846-8fbb-828a6a6f50af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indiana Michigan Power Co (Indiana) Effective date: 2013/04/01 End date if known: Rate name: CS-IRP2 - Contract Service Interruptible Power Sector: Industrial Description: Availability of Service. Available to customers having interruptible demands of 1,000 kW/kVA or greater, who contract for service under one of the Company's interruptible service options. The Company reserves the right to limit the total contract capacity for all customers served under this tariff to 235,000 kVA.

157

Data:Cd0e081d-b1af-4053-9cef-a174cc6ade14 | Open Energy Information  

Open Energy Info (EERE)

1d-b1af-4053-9cef-a174cc6ade14 1d-b1af-4053-9cef-a174cc6ade14 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Winnsboro, South Carolina (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Large Power Service Sector: Commercial Description: Non residential with monthly demand over 125 kVa. Source or reference: ISU Documentation Rate Binder Ted #12 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

158

Data:957a2a55-a2e5-47c5-93de-65d4bc560af2 | Open Energy Information  

Open Energy Info (EERE)

5-a2e5-47c5-93de-65d4bc560af2 5-a2e5-47c5-93de-65d4bc560af2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mt Wheeler Power, Inc Effective date: 2012/01/10 End date if known: Rate name: H-2 (Unmetered Residential Electric Heat Rate) Sector: Residential Description: Source or reference: http://www.mwpower.net/content/member-services-rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

159

Data:56a678b4-d6af-4045-a405-c25eab7f7432 | Open Energy Information  

Open Energy Info (EERE)

b4-d6af-4045-a405-c25eab7f7432 b4-d6af-4045-a405-c25eab7f7432 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/02/23 End date if known: Rate name: 14ft fiberglass poles Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

160

Data:B5d093af-82b7-49a4-acb4-769e99ecabaa | Open Energy Information  

Open Energy Info (EERE)

3af-82b7-49a4-acb4-769e99ecabaa 3af-82b7-49a4-acb4-769e99ecabaa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbus Southern Power Co Effective date: 2012/03/09 End date if known: Rate name: Interruptible Power - Discretionary(Subtransmission voltage)-supplemental interruptions Sector: Industrial Description: Service pursuant to this schedule is available to customers that have provided reasonable evidence to the Company that their electric service can be interrupted within a 10-minute notice period. Customers shall contract for electrical capacity sufficient to meet normal maximum requirements but not

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Data:992b86b2-af95-41e8-b4a0-aa1d28cd0ce4 | Open Energy Information  

Open Energy Info (EERE)

6b2-af95-41e8-b4a0-aa1d28cd0ce4 6b2-af95-41e8-b4a0-aa1d28cd0ce4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Joe Wheeler Elec Member Corp Effective date: 2013/05/01 End date if known: Rate name: Outdoor Lighting Rate--Schedule LS Metal Halide Cobra Head (250w) Sector: Lighting Description: Available for service to street and park lighting systems, traffic signal systems, athletic field lighting installations, and outdoor lighting for individual customers. Service under this schedule is for a term of not less than 1 year. Source or reference: http://www.jwemc.org/rateforms.aspx Source Parent:

162

Data:E5ae26a9-c82c-4da9-b58c-af18baadfc70 | Open Energy Information  

Open Energy Info (EERE)

6a9-c82c-4da9-b58c-af18baadfc70 6a9-c82c-4da9-b58c-af18baadfc70 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Snohomish County PUD No 1 Effective date: 2013/04/01 End date if known: Rate name: GENERAL SERVICE SMALL LOAD Sector: Commercial Description: This rate schedule does not apply to a "New Large Single Load" as defined in Rate Schedule 37. Such loads shall be served by Rate Schedule 37 - New Large Single Loads. Source or reference: http://www.snopud.com/Site/Content/Documents/rates/ElectricRates040113.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

163

Data:1b1e8349-acf3-4d36-bd1a-f308984a664a | Open Energy Information  

Open Energy Info (EERE)

349-acf3-4d36-bd1a-f308984a664a 349-acf3-4d36-bd1a-f308984a664a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bandon, Oregon (Utility Company) Effective date: End date if known: Rate name: Public Authority Small Commercial Single Phase- Inside City Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

164

Data:Ac4af87a-7bc7-47a4-970b-0a1ae7780f67 | Open Energy Information  

Open Energy Info (EERE)

af87a-7bc7-47a4-970b-0a1ae7780f67 af87a-7bc7-47a4-970b-0a1ae7780f67 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Ripley, Tennessee (Utility Company) Effective date: 2013/08/01 End date if known: Rate name: Industrial TDGSA Sector: Industrial Description: We buy our electricity from the Tennessee Valley Authority, which has a history of providing lower-cost electric power. The purchase of electricity, in fact, is a large amount of Ripley Power & Light's electric cost. About 82 cents of every dollar paid by our customers for electricity is used to purchase energy from TVA.

165

Data:Cb3274d0-2790-4437-9829-c04a8a2a67af | Open Energy Information  

Open Energy Info (EERE)

274d0-2790-4437-9829-c04a8a2a67af 274d0-2790-4437-9829-c04a8a2a67af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Key West, Florida (Utility Company) Effective date: End date if known: Rate name: s Sector: Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures Structure for Rate Period 1

166

Data:829dfd98-3f85-4234-af8b-43cee9554be4 | Open Energy Information  

Open Energy Info (EERE)

829dfd98-3f85-4234-af8b-43cee9554be4 829dfd98-3f85-4234-af8b-43cee9554be4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Logan County Coop Power & Light Effective date: 2013/01/01 End date if known: Rate name: LARGE POWER SERVICE Sector: Industrial Description: Annual Critical Peak demand charge of $6.80/kW. Source or reference: www.logancounty.coop Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

167

Data:C4e629a9-ce4c-49c8-af2d-e1d7245d85ef | Open Energy Information  

Open Energy Info (EERE)

9a9-ce4c-49c8-af2d-e1d7245d85ef 9a9-ce4c-49c8-af2d-e1d7245d85ef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: Schedule B - Small General Service - City of Fife Sector: Commercial Description: For Nonresidential lighting, heating, and incidental power uses where demand meter may be installed. Also for nonresidential incidental powers uses where a meter is not installed. Source or reference: www.mytpu.org/file_viewer.aspx?id=6167 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

168

Data:07cd3164-dab2-499c-af0e-d4b08c7e9d0a | Open Energy Information  

Open Energy Info (EERE)

-dab2-499c-af0e-d4b08c7e9d0a -dab2-499c-af0e-d4b08c7e9d0a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Menasha, Wisconsin (Utility Company) Effective date: 2011/04/06 End date if known: Rate name: Gs-1 General Service Single Phase less than 50kW Demand Sector: Commercial Description: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 50 kilowatts for three or more months in a consecutive 12-month period.

169

Data:7410f715-b230-4e4d-8918-f76dcc3af95b | Open Energy Information  

Open Energy Info (EERE)

5-b230-4e4d-8918-f76dcc3af95b 5-b230-4e4d-8918-f76dcc3af95b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Grantville, Georgia (Utility Company) Effective date: End date if known: Rate name: Commercial Large/Industrial -Monthly Sector: Industrial Description: Applicable to non-residential uses where there are 3 consecutive months exceeding 3000KWh, or the average monthly metered energy usage is greater than 3,000 KWh, or any 1 month of the preceding 12 months exceeds 48,00KWh. Source or reference: Rate Binder#2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

170

Data:A25af663-a82a-4c3f-8ac7-37afa5d56907 | Open Energy Information  

Open Energy Info (EERE)

af663-a82a-4c3f-8ac7-37afa5d56907 af663-a82a-4c3f-8ac7-37afa5d56907 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Commercial Load Control Single Phase-Rate 71 Sector: Commercial Description: 1. Available for oil well pumping, commercial and industrial uses,where a portion of the consumer's peak demand may be reduced or eliminated through the use of installed load control equipment by the cooperative. 2. Service under this schedule is limited to consumers whose load requirements do not exceed 50kVA of transformer capacity.

171

Data:896cdad9-ffc6-41db-af9b-80e3b0368639 | Open Energy Information  

Open Energy Info (EERE)

cdad9-ffc6-41db-af9b-80e3b0368639 cdad9-ffc6-41db-af9b-80e3b0368639 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Monongahela Power Co Effective date: 2012/04/02 End date if known: Rate name: D (General Service) Sector: Commercial Description: AVAILABLE at a single place of use for any purpose when all deliveries are at the standard distribution voltage of the immediate area as designated by Company but not less than 1,000 volts, and through one metering point, except that service shall not be available for standby or maintenance service such as that required for Alternative Generation Facilities. An Electric Service Agreement shall be executed.

172

Data:49cb924e-442d-4713-8256-68af50c3f2d4 | Open Energy Information  

Open Energy Info (EERE)

9cb924e-442d-4713-8256-68af50c3f2d4 9cb924e-442d-4713-8256-68af50c3f2d4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sand Mountain Electric Coop Effective date: 2013/09/01 End date if known: Rate name: Schedule TGSA - General Power Service Part 2 Sector: Commercial Description: Source or reference: ISU Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

173

Data:Dd8a845e-68af-4bd7-897f-37026f130598 | Open Energy Information  

Open Energy Info (EERE)

a845e-68af-4bd7-897f-37026f130598 a845e-68af-4bd7-897f-37026f130598 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Custer Public Power District Effective date: 2013/01/01 End date if known: Rate name: RURAL MISCELLANEOUS - RATE CLASS 04 Sector: Residential Description: Source or reference: http://www.custerpower.com/2012_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

174

Data:5e08d34b-8af4-4b48-9165-0deed1281d38 | Open Energy Information  

Open Energy Info (EERE)

d34b-8af4-4b48-9165-0deed1281d38 d34b-8af4-4b48-9165-0deed1281d38 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wild Rice Electric Coop, Inc Effective date: 2012/03/18 End date if known: Rate name: FARM AND HOME SERVICE - Up to 25 KVA transformer Sector: Residential Description: Source or reference: http://www.wildriceelectric.com/b-rate.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

175

Data:C1344d67-c952-4af4-aaa7-ca224611f186 | Open Energy Information  

Open Energy Info (EERE)

d67-c952-4af4-aaa7-ca224611f186 d67-c952-4af4-aaa7-ca224611f186 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kenergy Corp Effective date: 2011/09/01 End date if known: Rate name: Schedule 43 - Small Power Production or Cogeneration (100 KW or Less) Sector: Description: AVAILAE3LE Available only to qualifying small power production or co generation facilities, 100 KW or below, which have executed an "Agreement for Purchase of Electric Energy" with Kenergy. Source or reference: http://psc.ky.gov/tariffs/Electric/Kenergy%20Corp/Tariff.pdf Source Parent: Comments Applicability Demand (kW)

176

Data:F5ab56dd-1e82-477b-af0d-ad3551c18026 | Open Energy Information  

Open Energy Info (EERE)

6dd-1e82-477b-af0d-ad3551c18026 6dd-1e82-477b-af0d-ad3551c18026 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salt River Electric Coop Corp Effective date: 2012/06/01 End date if known: Rate name: Cogeneration and small power production power purchase rate schedule less than 100 kW Sector: Commercial Description: Available only to qualified cogeneration or small power production facilities with a design capacity of less than 100 kW. Source or reference: www.srelectric.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

177

Data:7704abca-f8af-4cbe-856b-fc2c9b9c94ed | Open Energy Information  

Open Energy Info (EERE)

abca-f8af-4cbe-856b-fc2c9b9c94ed abca-f8af-4cbe-856b-fc2c9b9c94ed No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sylvania, Georgia (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: Industrial Electric-DISC Sector: Industrial Description: Source or reference: Rate Binder #2 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

178

Data:B23a23c8-b799-4b22-af67-b1eea4a01a12 | Open Energy Information  

Open Energy Info (EERE)

c8-b799-4b22-af67-b1eea4a01a12 c8-b799-4b22-af67-b1eea4a01a12 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Altamont, Kansas (Utility Company) Effective date: 2008/12/30 End date if known: Rate name: Industrial Power Sector: Industrial Description: Source or reference: Ted Binder 2 Source Parent: Comments Does not include the energy cost of electricity supplied to the city of altamont. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

179

Data:3519d3ba-8f6d-48af-8121-3423e1d2f6b0 | Open Energy Information  

Open Energy Info (EERE)

ba-8f6d-48af-8121-3423e1d2f6b0 ba-8f6d-48af-8121-3423e1d2f6b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Glasgow, Kentucky (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Outdoor Light- 100W High Pressure Sodium Sector: Lighting Description: Source or reference: http://www.glasgowepb.net/EPBrates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

180

Data:C46a1b4f-ed8e-4130-bde6-082d6e3583af | Open Energy Information  

Open Energy Info (EERE)

a1b4f-ed8e-4130-bde6-082d6e3583af a1b4f-ed8e-4130-bde6-082d6e3583af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Crisp County Power Comm Effective date: 2012/04/01 End date if known: Rate name: Irrigation Off-Peak Service Sector: Commercial Description: To all electric service of one standard voltage required on the customers premises, delivered at one point and metered or compensated to that voltage for irrigation purposes during off-peak period. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Data:0fe6a7dc-bad4-4479-af7d-726aea53561d | Open Energy Information  

Open Energy Info (EERE)

dc-bad4-4479-af7d-726aea53561d dc-bad4-4479-af7d-726aea53561d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Williams - AZ, Arizona (Utility Company) Effective date: End date if known: Rate name: Dusk to Dawn Lighting Service(LPS 180 W-Pole) Sector: Lighting Description: Where customer installs and maintains lighting facilities and City approves installation, operates and replaces lamps. Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

182

Data:A0c82e3b-6bfa-4504-a15c-cf2d97834af5 | Open Energy Information  

Open Energy Info (EERE)

6bfa-4504-a15c-cf2d97834af5 6bfa-4504-a15c-cf2d97834af5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Ludlow, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: 07 Commercial & Industrial Demand Metered Single Phase Secondary Voltage Sector: Description: Source or reference: ISU Documentation DOE Sharepoint Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

183

Data:2214554f-5b28-4fd7-a225-50f02af8ffa2 | Open Energy Information  

Open Energy Info (EERE)

4f-5b28-4fd7-a225-50f02af8ffa2 4f-5b28-4fd7-a225-50f02af8ffa2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Middle Georgia El Member Corp Effective date: End date if known: Rate name: Outdoor Lighting Decorative HPS 100 W Sector: Lighting Description: Source or reference: http://www.mgemc.com/outdoorlighting.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

184

Data:1079c2a8-f748-439f-af1b-4a8487e3457f | Open Energy Information  

Open Energy Info (EERE)

f748-439f-af1b-4a8487e3457f f748-439f-af1b-4a8487e3457f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: INSTITIONAL SERVICE RATE NON ELECTRIC 15000& LESS Sector: Commercial Description: Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

185

Data:B784c9eb-0516-44f6-b856-3019af3e091d | Open Energy Information  

Open Energy Info (EERE)

4c9eb-0516-44f6-b856-3019af3e091d 4c9eb-0516-44f6-b856-3019af3e091d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: Industrial Renewable Energy Rider Sector: Industrial Description: Service under this rider is available to all customers currently served under Rate Schedules Cp-1, Cp-1TOPD, Cp-2 and Cp-3. This rider allows customers the option of purchasing blocks of their energy from renewable sources. Block charge = $2.00 per 300kWh. Source or reference: http://www.algomautilities.com/media/Electric_Rate_Tariff_Sheets.pdf

186

Data:3253e4af-ccbd-4b70-a894-4cdf54cc19de | Open Energy Information  

Open Energy Info (EERE)

af-ccbd-4b70-a894-4cdf54cc19de af-ccbd-4b70-a894-4cdf54cc19de No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indiana Michigan Power Co (Michigan) Effective date: 2013/01/01 End date if known: Rate name: ECLS - 70 Watt HPS Sector: Lighting Description: Energy Conversation Lighting Service Available for streetlighting service to municipalities, counties, and other governmental subdivisions. This rate is applicable for service that is supplied through new or rebuilt streetlight systems, including extension of streetlighting systems to additional locations where service is requested by customer.

187

Data:D950a1c4-4ec7-4914-bbcd-a2c1c03af787 | Open Energy Information  

Open Energy Info (EERE)

0a1c4-4ec7-4914-bbcd-a2c1c03af787 0a1c4-4ec7-4914-bbcd-a2c1c03af787 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Electric Member Corp Effective date: 2010/11/01 End date if known: Rate name: SCHEDULE I-8 - greater than 30 kVA (Single Phase - Non-Interruptible Energy Charge) Sector: Commercial Description: Applicable for electric service supplied to irrigation loads. The capacity of individual motors served under this schedule shall not exceed ten (10) horsepower without consent from the Cooperative. Source or reference: ISU Documentation Source Parent: Comments String representation "Whenever the co ... escribed below:" is too long.

188

Data:Cf50bbee-5af6-4109-bb41-6e83f8b3809a | Open Energy Information  

Open Energy Info (EERE)

bbee-5af6-4109-bb41-6e83f8b3809a bbee-5af6-4109-bb41-6e83f8b3809a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: San Luis Valley R E C, Inc Effective date: 2013/01/01 End date if known: Rate name: Large Power- Less than 500 kW Sector: Industrial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

189

Data:Aedee23d-1556-4e68-af7f-1fd31d075c17 | Open Energy Information  

Open Energy Info (EERE)

Aedee23d-1556-4e68-af7f-1fd31d075c17 Aedee23d-1556-4e68-af7f-1fd31d075c17 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2011/02/01 End date if known: Rate name: Lighting Service--Schedule L-1 Mercury Vapor Lamp- Parking Lot Luminaire (400w) 4 units on Pole Sector: Lighting Description: Available to Members, governments, agencies, public and private organizations desiring Electric Delivery or Electric Supply and Delivery Services through unmetered services for roadway and area lighting. Source or reference: http://www.delaware.coop/my-services/residential/billing/rates

190

Data:5fe98da7-a9e8-4284-9a17-f044af510047 | Open Energy Information  

Open Energy Info (EERE)

8da7-a9e8-4284-9a17-f044af510047 8da7-a9e8-4284-9a17-f044af510047 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mt Wheeler Power, Inc Effective date: 2012/01/10 End date if known: Rate name: OLS - New Poles 200 W HPS Sector: Lighting Description: Source or reference: http://www.mwpower.net/content/member-services-rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

191

Data:67c9be31-03af-4e73-855a-ff209849aea6 | Open Energy Information  

Open Energy Info (EERE)

-03af-4e73-855a-ff209849aea6 -03af-4e73-855a-ff209849aea6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Raton Public Service Company Effective date: End date if known: Rate name: Security Light 2 Sector: Lighting Description: Security lights are available to all (except as noted) residential, commercial and industrial customers served by the Raton Public Service Company for outside lighting purposes at the voltage and phase of the company's distribution system. RPS owns fixture and power is furnished by customer. RPS furnishes parts & service. Source or reference: Rates Binder 5B (Illinois State University)

192

Data:04c2fc43-6005-40af-a6b6-5a295c377998 | Open Energy Information  

Open Energy Info (EERE)

fc43-6005-40af-a6b6-5a295c377998 fc43-6005-40af-a6b6-5a295c377998 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No2 Pinal Cnty Effective date: 2012/07/11 End date if known: Rate name: Lighting Rate Schedule No. 8-Owned By District-Standard Pole - Steel - 30 Ft-100 Watt Sector: Lighting Description: Applicability: Applicable to any type of photocell operated fixtures, either individual or multiple, operated from dusk to dawn. Source or reference: http://www.ed2.com/Docs/Rates/Security%20and%20Street%20Lighting%20Schedule%20No.%208.pdf Source Parent: Comments Applicability

193

Data:32836304-482d-48ae-a5ff-f4e1152af08c | Open Energy Information  

Open Energy Info (EERE)

6304-482d-48ae-a5ff-f4e1152af08c 6304-482d-48ae-a5ff-f4e1152af08c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Navajo Tribal Utility Authority Effective date: End date if known: Rate name: large power service industrial Sector: Industrial Description: Source or reference: http://www.ntua.com/utility_rates/large_power_services.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

194

Data:74d9b267-0a55-4a72-b30c-af3b0245f651 | Open Energy Information  

Open Energy Info (EERE)

b267-0a55-4a72-b30c-af3b0245f651 b267-0a55-4a72-b30c-af3b0245f651 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1995/12/01 End date if known: Rate name: Security Lighting Service-400W Metal Halide Coop-Owned & Maintained Sector: Lighting Description: Available upon application to all consumers for illumination of outdoor areas at any point on or near the Cooperative's distribution or service lines. Additional Poles (incl. up to 150' of wire) = $2.00/pole/month Transformers or Secondary Line installed for lighting use only = $2.00/transformer/month

195

Data:Df43da8a-c64c-48f2-8821-228fa066af79 | Open Energy Information  

Open Energy Info (EERE)

a-c64c-48f2-8821-228fa066af79 a-c64c-48f2-8821-228fa066af79 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Frankfort, Kentucky (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Area Lighting- (Directional Fixture 400W HPS) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

196

Data:85c3f715-c2af-48ce-9bce-2bd49ff241b8 | Open Energy Information  

Open Energy Info (EERE)

f715-c2af-48ce-9bce-2bd49ff241b8 f715-c2af-48ce-9bce-2bd49ff241b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Burlington-Electric, Vermont (Utility Company) Effective date: 2010/03/01 End date if known: Rate name: Street Lighting (SL) Rate 175 Watt Metal Halide Sector: Lighting Description: For municipal street lighting on city-accepted streets. Source or reference: https://www.burlingtonelectric.com/ELBO/assets/Tariff%20Sheets%20June%20262009%20revised-1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

197

Data:74b96db2-a9fa-46a9-af93-5e8986655f92 | Open Energy Information  

Open Energy Info (EERE)

db2-a9fa-46a9-af93-5e8986655f92 db2-a9fa-46a9-af93-5e8986655f92 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lea County Electric Coop, Inc Effective date: 2009/08/30 End date if known: Rate name: Primary Service Over 2MW Sector: Industrial Description: Available system-wide, under contract, for petroleum pumping, pipeline pumping, government agencies, industrial uses, and such other service in conjuction therewith and incidental thereto, supplied at one point of delivery, measured by watt-hour meter, where facilities of adequate capacity and suitable potential are adjacent to the premises to be served over 2000k demand.

198

Data:2b96cde0-50b2-4362-9090-5af32ab0adc9 | Open Energy Information  

Open Energy Info (EERE)

6cde0-50b2-4362-9090-5af32ab0adc9 6cde0-50b2-4362-9090-5af32ab0adc9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bloomer Electric & Water Co Effective date: 1999/09/15 End date if known: Rate name: Rg-1 Residential Service Sector: Residential Description: This rate will be applied to residential single-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission. Fixed Monthly Charge includes Commitment to Community Rider: $1.33 per customer per month Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=580

199

Data:F4053af7-d478-4062-b322-59e6e3105cd8 | Open Energy Information  

Open Energy Info (EERE)

af7-d478-4062-b322-59e6e3105cd8 af7-d478-4062-b322-59e6e3105cd8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lighthouse Electric Coop, Inc Effective date: 2012/06/01 End date if known: Rate name: Security Lighting 175W MV Sector: Lighting Description: Energy Usage 70KWH Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3

200

Data:E23a0fa2-427e-49be-8570-648dccf3a1af | Open Energy Information  

Open Energy Info (EERE)

fa2-427e-49be-8570-648dccf3a1af fa2-427e-49be-8570-648dccf3a1af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lindsborg, Kansas (Utility Company) Effective date: End date if known: Rate name: Industrial Sector: Industrial Description: Source or reference: http://www.lindsborgcity.org/index.aspx?NID=245 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Data:E45be3bf-e92d-4fcd-99c9-cc72af022f6f | Open Energy Information  

Open Energy Info (EERE)

E45be3bf-e92d-4fcd-99c9-cc72af022f6f E45be3bf-e92d-4fcd-99c9-cc72af022f6f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lyntegar Electric Coop, Inc Effective date: 2010/05/01 End date if known: Rate name: Cotton Gin Service "CG" Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

202

Data:0d4af3ed-5f8f-4556-bb2f-c8b9c75e453b | Open Energy Information  

Open Energy Info (EERE)

af3ed-5f8f-4556-bb2f-c8b9c75e453b af3ed-5f8f-4556-bb2f-c8b9c75e453b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwest Texas Elec Coop, Inc Effective date: End date if known: Rate name: Standby Service Primary Delivery Sector: Commercial Description: The Demand Charge is the combination of the Distribution Substation Delivery charge as well as the Distribution Primary Delivery Charge. This rate must also account for the cost of power. Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

203

Data:20ca22af-871f-44fe-9416-14e28a4b07ae | Open Energy Information  

Open Energy Info (EERE)

2af-871f-44fe-9416-14e28a4b07ae 2af-871f-44fe-9416-14e28a4b07ae No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Two Rivers Water & Light Effective date: 2011/01/01 End date if known: Rate name: Residential- Single-Phase Sector: Residential Description: This rate will be applied to residential single-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission. The following Riders, Adjustments, and Billing Options are applicable to this rate: Power Cost Adjustment Clause: Charge per all kWh varies monthly

204

Data:10d8b09f-0cf6-4265-b43a-eaa7ac88af90 | Open Energy Information  

Open Energy Info (EERE)

f-0cf6-4265-b43a-eaa7ac88af90 f-0cf6-4265-b43a-eaa7ac88af90 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Detroit Edison Co Effective date: 2011/12/21 End date if known: Rate name: ALL-ELECTRIC SCHOOL BUILDING SERVICE RATE D10-RETAIL SERVICE Sector: Commercial Description: Available to customers desiring service in school buildings served at primary voltage who contract for a specified installed capacity of not less than 50 kilowatts at a single location provided the space heating and water heating for all or a substantial portion of the premises is supplied by electric service and is installed on a permanent basis.

205

Data:C1c41b60-03af-41f7-9164-be1815f94199 | Open Energy Information  

Open Energy Info (EERE)

b60-03af-41f7-9164-be1815f94199 b60-03af-41f7-9164-be1815f94199 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maui Electric Co Ltd Effective date: 2012/05/04 End date if known: Rate name: Maui-SCHEDULE F PUBLIC STREET LIGHTING-100/150/250 Watt High Pressure Sodium Sector: Lighting Description: Availability: Applicable to public street and highway lighting service supplied on the Island of Maui where the Company owns, maintains and operates the street lighting facilities. Minimum Charge: Fixture charge+$25.00 Source or reference: http://www.mauielectric.com/vcmcontent/FileScan/PDF/EnergyServices/Tarrifs/MECO/MauiRatesSchF.pdf

206

Data:E3c60210-fcac-4c0c-a0af-e7357078a320 | Open Energy Information  

Open Energy Info (EERE)

fcac-4c0c-a0af-e7357078a320 fcac-4c0c-a0af-e7357078a320 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Daviess Martin County R E M C Effective date: 2011/10/01 End date if known: Rate name: Security Lights-400W Sector: Lighting Description: *there is a charge of $150 to install. An REMC representative will meet with you for a security light pole-set consultation. If we set the pole, there will be an initial $150 fee, and a monthly fee that will be added to your electric bill, based on the rate table below. Upon payment of the fees, the REMC will be responsible for maintaining the pole and light.

207

Data:9773c94a-a5f7-4d6c-9af2-528749d83386 | Open Energy Information  

Open Energy Info (EERE)

c94a-a5f7-4d6c-9af2-528749d83386 c94a-a5f7-4d6c-9af2-528749d83386 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: OL "Incandescent 202 Watt (Existing Pole) 69 Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

208

Data:Cbe858a4-24af-4a12-b682-43aa0102ba7a | Open Energy Information  

Open Energy Info (EERE)

Cbe858a4-24af-4a12-b682-43aa0102ba7a Cbe858a4-24af-4a12-b682-43aa0102ba7a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Broad River Electric Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Rate Code 14, 4Lots Per Light Single-Phase Sector: Lighting Description: * Available to residential consumers of the cooperative in residences,condominiums,mobile homes or individually metered apartment. Subject to taxes and wholesale power cost adjustment. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

209

Data:701cdab7-87af-4dee-bb54-496cb2bb15b5 | Open Energy Information  

Open Energy Info (EERE)

cdab7-87af-4dee-bb54-496cb2bb15b5 cdab7-87af-4dee-bb54-496cb2bb15b5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2000/11/01 End date if known: Rate name: AREA LIGHTING 200 watt wide angle high pressure sodium Sector: Lighting Description: Available to all customers for dusk to dawn outdoor area lighting not served under street lighting contract. Service under this schedule is also available for television amplifiers for cable systems, and other flat rate services. Special Poles $1.00 per month Source or reference: http://www.tpud.org/servicesAndBilling/rateSchedules/rateSchedules_Light.aspx

210

Data:Dfe9a6f3-edd9-4ab4-af25-268e6da647a2 | Open Energy Information  

Open Energy Info (EERE)

Dfe9a6f3-edd9-4ab4-af25-268e6da647a2 Dfe9a6f3-edd9-4ab4-af25-268e6da647a2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kings Mountain, North Carolina (Utility Company) Effective date: 2011/07/31 End date if known: Rate name: Outdoor Lighting Service- 400W High Pressure Sodium- Urban, Existing Pole Sector: Lighting Description: Available to individual customer at locations on the City's distribution system. Source or reference: http://www.cityofkm.com/Downloads/billing/Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

211

Data:243fbc2a-b9af-4052-9aa7-03256b5aff6e | Open Energy Information  

Open Energy Info (EERE)

a-b9af-4052-9aa7-03256b5aff6e a-b9af-4052-9aa7-03256b5aff6e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kit Carson Electric Coop, Inc Effective date: 2011/09/22 End date if known: Rate name: Lighting Service - Metered Steel or Fiberglass pole - 400W M.V or 400 W HPS Sector: Lighting Description: Available to all consumers and within the Utility's service area, unless otherwise noted. Source or reference: www.kitcarson.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

212

Data:Ab4d4be7-8371-4558-a66b-8492e0d3af89 | Open Energy Information  

Open Energy Info (EERE)

d4be7-8371-4558-a66b-8492e0d3af89 d4be7-8371-4558-a66b-8492e0d3af89 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Cooperative Inc Effective date: 2011/01/01 End date if known: Rate name: Dual fuel/geothermal (DFG10) Sector: Commercial Description: Dual fuel/geothermal Source or reference: http://www.adamsec.com/content/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

213

Data:E7b859bf-4846-4454-a578-937e8f5af100 | Open Energy Information  

Open Energy Info (EERE)

b859bf-4846-4454-a578-937e8f5af100 b859bf-4846-4454-a578-937e8f5af100 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/02/23 End date if known: Rate name: 20000 lumen 454 watt MV (limited) Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

214

Data:Da52725b-1af6-46d4-8d76-e0c54d00e544 | Open Energy Information  

Open Energy Info (EERE)

5b-1af6-46d4-8d76-e0c54d00e544 5b-1af6-46d4-8d76-e0c54d00e544 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power (Maryland) Effective date: 2011/07/08 End date if known: Rate name: OUTDOOR LIGHTING "OL"Mercury Vapor 100W Sector: Lighting Description: there are many different classifications for different structures for lights. The monthly charge here is for the existing pole. Click on the link for other structures. Source or reference: http://www.delmarva.com/_res/documents/DPLMdMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

215

Data:0d42b7af-6fa9-47a9-a039-40d1f3129151 | Open Energy Information  

Open Energy Info (EERE)

2b7af-6fa9-47a9-a039-40d1f3129151 2b7af-6fa9-47a9-a039-40d1f3129151 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bandon, Oregon (Utility Company) Effective date: End date if known: Rate name: Residential- Outside City Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

216

Data:Dd465fd6-b3ba-4380-ac59-380af481c26e | Open Energy Information  

Open Energy Info (EERE)

65fd6-b3ba-4380-ac59-380af481c26e 65fd6-b3ba-4380-ac59-380af481c26e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Prince George Electric Coop Effective date: 2009/10/01 End date if known: Rate name: SCHEDULE GS-4 GENERAL SERVICE Multi Phase 50kVA or greater Sector: Industrial Description: Applicability: Applicable for single-phase or multi-phase service not subject to Schedule A-7 or Schedule SGS-4 where the customer's load requires 50kVA or less of transformer capacity. This schedule is not applicable for service to any equipment with an initial inrush current in excess of 260 amperes unless approved by the Cooperative.

217

Data:4a7ac2b6-e130-48db-af70-4a2848d78dcf | Open Energy Information  

Open Energy Info (EERE)

e130-48db-af70-4a2848d78dcf e130-48db-af70-4a2848d78dcf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Navopache Electric Coop, Inc Effective date: 2012/08/01 End date if known: Rate name: Small Commercial Sector: Commercial Description: * This is applicable to all commercial uses. Source or reference: http://navopache.coopwebbuilder.com/sites/navopache.coopwebbuilder.com/files/small_commercial_2012.pdf. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

218

Data:2d7c01ee-74f6-437e-aeee-09aae6af76b8 | Open Energy Information  

Open Energy Info (EERE)

ee-74f6-437e-aeee-09aae6af76b8 ee-74f6-437e-aeee-09aae6af76b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gastonia, North Carolina (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: SCHEDULE RE - Residential All Elecric Sector: Residential Description: *Fixed Monthly Charge = $10.40 + REPS($0.47) = $10.87 Source or reference: *Binder "A" Gastonia, North Carolina Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

219

Data:90f72182-16d1-4b88-af5a-1eadf2c935cc | Open Energy Information  

Open Energy Info (EERE)

2182-16d1-4b88-af5a-1eadf2c935cc 2182-16d1-4b88-af5a-1eadf2c935cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pioneer Electric Coop, Inc Effective date: 2012/03/27 End date if known: Rate name: SCHEDULE LP-12 LARGE POWER SERVICE Sector: Industrial Description: AVAILABILITY Available to consumers for all electric service of one character supplied at one point of delivery who require 50 kVA or more of transformer capacity. Not available for breakdown, standby, supplemental, resale or shared service. Motors of 10 horsepower or more must be three phase. This rate applies to accounting schedule 442.2 GL-3.

220

Data:Fd49876a-32fb-4b3a-869e-2eba06af106b | Open Energy Information  

Open Energy Info (EERE)

6a-32fb-4b3a-869e-2eba06af106b 6a-32fb-4b3a-869e-2eba06af106b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cleco Power LLC Effective date: 2011/02/01 End date if known: Rate name: Company-Owned Fixture - Floodlights 250 Watt HPS Sector: Lighting Description: Source or reference: www.cleco.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Data:6d11a09c-edeb-4e93-9034-fe35af6fba21 | Open Energy Information  

Open Energy Info (EERE)

c-edeb-4e93-9034-fe35af6fba21 c-edeb-4e93-9034-fe35af6fba21 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Potomac Electric Power Co Effective date: End date if known: Rate name: General Service Primary Service - Schedule GS3A Sector: Description: the demand is tiered, cannot be entered into openei Source or reference: http://www.pepco.com/_res/documents/DCRates_GS3A.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

222

Data:38a36af3-7c12-4946-b65d-6b87c68b67da | Open Energy Information  

Open Energy Info (EERE)

af3-7c12-4946-b65d-6b87c68b67da af3-7c12-4946-b65d-6b87c68b67da No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shawano Municipal Utilities Effective date: 2007/08/20 End date if known: Rate name: General Three Phase TOD 3 Sector: Commercial Description: Source or reference: http://www.shawano.tv/id75.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

223

Data:260485c0-7af8-433d-b85b-96b51dc2d41b | Open Energy Information  

Open Energy Info (EERE)

-7af8-433d-b85b-96b51dc2d41b -7af8-433d-b85b-96b51dc2d41b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: Schedule CP - Contract Industrial Sector: Industrial Description: See source for more information Source or reference: www.nytpu.org/file_viewer.aspx?id=6168 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

224

Data:960e73dd-9408-4c8c-ac23-a5154f356af0 | Open Energy Information  

Open Energy Info (EERE)

dd-9408-4c8c-ac23-a5154f356af0 dd-9408-4c8c-ac23-a5154f356af0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Taunton, Massachusetts (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Private Lighting (175 W Mercury Fixture) Sector: Lighting Description: These rates are available to consumers for outdoor lighting service for private property. Source or reference: http://www.tmlp.com/page.php?content=rate_sheets_home Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

225

Data:9f0c55af-3663-456e-a3ed-e351a3a9a1dd | Open Energy Information  

Open Energy Info (EERE)

5af-3663-456e-a3ed-e351a3a9a1dd 5af-3663-456e-a3ed-e351a3a9a1dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc (New Mexico) Effective date: 2010/05/01 End date if known: Rate name: Seasonal With /AO HP/Water Heater Sector: Commercial Description: Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1

226

Data:447cc91d-90ac-458d-923e-de90af470cf8 | Open Energy Information  

Open Energy Info (EERE)

0ac-458d-923e-de90af470cf8 0ac-458d-923e-de90af470cf8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wells Rural Electric Co Effective date: 2011/10/01 End date if known: Rate name: Municipal Street Light Sector: Lighting Description: This schedule is for service required for the lighting of public streets, through fares, alleys and public grounds where service is supplied from the Company owned electrical distribution system. Available to City governments, Nevada Department of Transportation and the Wells Indian Colony who are served by the Company, subject to the established rules and regulations of the Seller. Power Cost Adjustment: Determined by Seller per KWh

227

Data:F3138f6e-2d43-4308-8bf8-63d19af18532 | Open Energy Information  

Open Energy Info (EERE)

38f6e-2d43-4308-8bf8-63d19af18532 38f6e-2d43-4308-8bf8-63d19af18532 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Indiana Gas & Elec Co Effective date: 2011/05/03 End date if known: Rate name: SL-1 - A - 6000 Lumen Sector: Lighting Description: AVAILABILITY This Rate Schedule shall be available throughout Company's Service Area, subject to the availability of adequate facilities and power supplies, which determinations shall be within Company's reasonable discretion. APPLICABILITY This Rate Schedule shall be applicable for standard street and highway lighting service to any Customer which is a Municipal Corporation.

228

Data:0fc8b333-f5e4-4819-b0af-32b621ca4db2 | Open Energy Information  

Open Energy Info (EERE)

3-f5e4-4819-b0af-32b621ca4db2 3-f5e4-4819-b0af-32b621ca4db2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of South Sioux City, Nebraska (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Commercial and Industrial Non Demand- Single Phase Sector: Commercial Description: To any commercial or industrial customer for all purposes. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

229

Data:B13e7ba0-f818-45b6-8af5-db74c7317611 | Open Energy Information  

Open Energy Info (EERE)

f818-45b6-8af5-db74c7317611 f818-45b6-8af5-db74c7317611 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of St Louis, Michigan (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Residential Electric Heat Service A-3 Sector: Residential Description: This rate is available for residential customers who have electric heating. Source or reference: Rate Binder 3 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

230

Data:A01af4c4-f543-477c-89e1-18f32852eb36 | Open Energy Information  

Open Energy Info (EERE)

af4c4-f543-477c-89e1-18f32852eb36 af4c4-f543-477c-89e1-18f32852eb36 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Albemarle Electric Member Corp Effective date: 2012/06/01 End date if known: Rate name: Outdoor Security Lighting - 175 watt MV/MH - Pendant Sector: Lighting Description: * Single-phase, 60-cycle alternating current, providing service to automatically controlled dusk-to-dawn lighting, using either the Cooperative's standard fixtures on a new or existing pole or one of the Cooperative's standard ornamental lighting packages. Source or reference: http://www.albemarle-emc.com/Documents/rateschedule.pdf

231

Data:D21e70af-6f41-4481-8916-886b98a27c46 | Open Energy Information  

Open Energy Info (EERE)

e70af-6f41-4481-8916-886b98a27c46 e70af-6f41-4481-8916-886b98a27c46 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: 2011/05/23 End date if known: Rate name: General Service Primary Sector: Commercial Description: Customer & Facilities Charge + Energy Charge + All Riders (if applicable) + Service Fees (if applicable) + City Dividend for Utility Ownership + Sales Tax (if applicable); based on the RATE in effect and the System's Service Regulations. Plus, for billing periods less than 27 days, on the customer's first and final BILLS, a per day credit times the difference between 30 and the actual number of days in the BILLING PERIOD.

232

Data:B400a0cf-c392-4a2a-90af-6480a96838c7 | Open Energy Information  

Open Energy Info (EERE)

cf-c392-4a2a-90af-6480a96838c7 cf-c392-4a2a-90af-6480a96838c7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Grays Harbor Cnty Effective date: 2013/01/01 End date if known: Rate name: UNMETERED CUSTOMER-OWNED STREET LIGHTING FACILITIES 200w Sector: Lighting Description: UNMETERED CUSTOMER-OWNED STREET LIGHTING FACILITIES Source or reference: https://www.ghpud.org/index.php?option=com_content&view=article&id=1001&Itemid=207 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

233

Data:9796022a-f719-4fd6-910c-56e8dfec7792 | Open Energy Information  

Open Energy Info (EERE)

a-f719-4fd6-910c-56e8dfec7792 a-f719-4fd6-910c-56e8dfec7792 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Crisp County Power Comm Effective date: 2012/04/01 End date if known: Rate name: Power and Light- Medium Sector: Commercial Description: Energy Charge not compatible with database. Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

234

Data:80e4623d-40a6-4ae2-8532-1198af59b93b | Open Energy Information  

Open Energy Info (EERE)

623d-40a6-4ae2-8532-1198af59b93b 623d-40a6-4ae2-8532-1198af59b93b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Parke County Rural E M C Effective date: 2012/04/01 End date if known: Rate name: Yard Light Service: High Pressure Sodium 150W Sector: Lighting Description: Parke County REMC shall charge and collect for Yard and/or Street lighting service based on availability, character of service, monthly rate, and tax adjustment. AVAILABILITY: Available to any member of Parke County REMC for continuous, year-round service for out- door lighting where120 volt service exists ahead of the meter loop.

235

Data:5c0c96b5-2969-4436-af89-f7507f9374c7 | Open Energy Information  

Open Energy Info (EERE)

b5-2969-4436-af89-f7507f9374c7 b5-2969-4436-af89-f7507f9374c7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Menard Electric Coop Effective date: 2012/02/01 End date if known: Rate name: Security Light Service rate SL: 14,400 Lumen High Pressure Sodium Sector: Lighting Description: Dusk to dawn outdoor lighting, other than street lighting for towns and villages. Source or reference: http://www.menard.com/files/rates/rcSL_SecurityLight.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

236

Data:Fc5af6ab-024f-47e6-85b4-7cb9bbc53688 | Open Energy Information  

Open Energy Info (EERE)

af6ab-024f-47e6-85b4-7cb9bbc53688 af6ab-024f-47e6-85b4-7cb9bbc53688 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Woodruff Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Cotton Gin Sector: Industrial Description: To all electric service required by the customer on the premises, when supplied at one point of delivery and measured through one kwh meter. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

237

Data:8507ff8f-af03-4465-9f4d-cecab92507b9 | Open Energy Information  

Open Energy Info (EERE)

f-af03-4465-9f4d-cecab92507b9 f-af03-4465-9f4d-cecab92507b9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Bern, North Carolina (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Area Lighting Schedule - Mercury Vapor 21,000 Lumen 400w flood Sector: Lighting Description: Source or reference: www.newbern-nc.org/Elec/ElectricRates.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

238

Data:90b4210c-08cb-46a5-af7f-7958a49d01b0 | Open Energy Information  

Open Energy Info (EERE)

c-08cb-46a5-af7f-7958a49d01b0 c-08cb-46a5-af7f-7958a49d01b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Idaho Power Co Effective date: 2012/01/01 End date if known: Rate name: Schedule 91 - Energy Efficiency Rider Sector: Description: APPLICABILITY This schedule is applicable to all retail Customers served under the Company's schedules and special contracts. This Energy Efficiency Rider is designed to fund the Company's expenditures for the analysis and implementation of energy conservation and demand response programs. MONTHLY CHARGE The Monthly Charge is equal to the applicable Energy Efficiency Rider percentage times the sum of the monthly billed charges for the base rate components.

239

Data:A6c83d6a-f721-4121-bd13-a85df994ebcb | Open Energy Information  

Open Energy Info (EERE)

c83d6a-f721-4121-bd13-a85df994ebcb c83d6a-f721-4121-bd13-a85df994ebcb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Woodruff Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Outdoor lighting - Street Lights 400 W MH Sector: Lighting Description: To unmetered automatically controlled outdoor lighting service burning all night. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

240

Data:37560cec-af4c-485c-a37d-2020fa141c15 | Open Energy Information  

Open Energy Info (EERE)

cec-af4c-485c-a37d-2020fa141c15 cec-af4c-485c-a37d-2020fa141c15 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Davenport, Nebraska (Utility Company) Effective date: 2012/11/11 End date if known: Rate name: Directional Lighting Mh 250 W Sector: Lighting Description: Area/directional lighting of farmyards, backyards, patios, parking lots, storage yards, trailer courts, industrial sites, schools churches, apartments, businesses and many other applications where lighting is needed for identification, merchandising, environment, aesthetics, safety, security, protection or convenience.

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Data:2f2cd755-d433-485f-8202-af67d0e34c89 | Open Energy Information  

Open Energy Info (EERE)

55-d433-485f-8202-af67d0e34c89 55-d433-485f-8202-af67d0e34c89 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Huntingburg, Indiana (Utility Company) Effective date: 2007/01/01 End date if known: Rate name: Residential, Rural and City Sector: Residential Description: Available to any consumer of Huntingburg located on its lines for general residential use up to a metered demand on 100 kVa. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

242

Data:9f306391-a6c8-464c-933c-16a8a9af47ff | Open Energy Information  

Open Energy Info (EERE)

a6c8-464c-933c-16a8a9af47ff a6c8-464c-933c-16a8a9af47ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Polk County Rural Pub Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Urban General Service - Single Phase Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3

243

Data:9fc2de5b-186d-478b-9661-4bf90ce2af69 | Open Energy Information  

Open Energy Info (EERE)

de5b-186d-478b-9661-4bf90ce2af69 de5b-186d-478b-9661-4bf90ce2af69 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cleco Power LLC Effective date: 2011/02/01 End date if known: Rate name: Company-Owned Fixture - Cobra Head 400 Watt HPS Sector: Lighting Description: Source or reference: www.cleco.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

244

Data:5e440c32-ac22-40a1-8531-521af965bbf7 | Open Energy Information  

Open Energy Info (EERE)

-ac22-40a1-8531-521af965bbf7 -ac22-40a1-8531-521af965bbf7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Rg-1 Residential Service Single Phase with Customer-Owned Generation Systems(Greater than 20 kW) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales).

245

Data:570d464d-32af-4365-be1e-3fe6a14eb2c3 | Open Energy Information  

Open Energy Info (EERE)

4d-32af-4365-be1e-3fe6a14eb2c3 4d-32af-4365-be1e-3fe6a14eb2c3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sacramento Municipal Utility District Effective date: 2013/01/01 End date if known: 2013/12/31 Rate name: Pricing Pilot TOU Sector: Residential Description: For Use in summer months only Source or reference: https://www.smud.org/en/residential/customer-service/rate-information/rates-rules-regulations.htm Source Parent: Comments FRA= Solar Surcharge Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

246

Data:B2c65f0d-449c-464d-815b-af243c2c44c5 | Open Energy Information  

Open Energy Info (EERE)

d-449c-464d-815b-af243c2c44c5 d-449c-464d-815b-af243c2c44c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Adel, Georgia (Utility Company) Effective date: End date if known: Rate name: Small Power Service-Commercial Sector: Commercial Description: Billing demand for the current month and the preceding 11 months must be less than 50 KW. Average monthly energy consumption shall be greater than or equal to 3,000 kilowatt-hours. IN the event that average monthly energy consumption becomes permanently less than 3,000KWh, the consumer may switch to the appropriate tariff. Subject to Revenue adjustment and Environmental compliance cost recovery (ECCR)

247

Data:0431c922-a51c-4a61-af50-4ea5035a29ff | Open Energy Information  

Open Energy Info (EERE)

22-a51c-4a61-af50-4ea5035a29ff 22-a51c-4a61-af50-4ea5035a29ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: General Service Secondary Sector: Commercial Description: This rate is available on an annual basis to Power and Light customers who have an average On-Peak season monthly usage greater than 8,000 kWh. Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Database%20Now%20Compatible%20with%20Rates/Attachments/23/Duncan%20OK.pdf Source Parent: Comments

248

Data:Adb1e18b-1345-4ff7-838d-66b9af1fe75d | Open Energy Information  

Open Energy Info (EERE)

b-1345-4ff7-838d-66b9af1fe75d b-1345-4ff7-838d-66b9af1fe75d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Edmond, Oklahoma (Utility Company) Effective date: 2009/09/30 End date if known: Rate name: PL-TOU Power & Light Time-of-Use Sector: Lighting Description: Source or reference: http://edmondok.com/DocumentCenter/Home/View/442 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

249

Data:0eb370a7-8407-451f-b36b-02af07e56d12 | Open Energy Information  

Open Energy Info (EERE)

70a7-8407-451f-b36b-02af07e56d12 70a7-8407-451f-b36b-02af07e56d12 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Outdoor Security Lighting Service- SL-9 (400W MV-Open/Closed) Sector: Lighting Description: Applicable to consumers for dusk to dawn outdoor lighting in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent: Comments

250

Data:Ec9b0084-af94-40dc-a697-cb0d2f6056eb | Open Energy Information  

Open Energy Info (EERE)

b0084-af94-40dc-a697-cb0d2f6056eb b0084-af94-40dc-a697-cb0d2f6056eb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nebraska Public Power District Effective date: 2013/01/01 End date if known: Rate name: 75 W LED- Nonwood Sector: Commercial Description: To all night street lighting service (dusk to daylight) from the overhead systems conforming to the District's standard specifications. Nonwood; Enclosed Electricity is provided through the Village, which obtains electric power from Nebraska Public Power District (NPPD) Source or reference: http://www.nppd.com/assets/municipalstreetlightingservice.pdf

251

Data:3c80092c-1e91-4a91-ad94-d979af50246b | Open Energy Information  

Open Energy Info (EERE)

092c-1e91-4a91-ad94-d979af50246b 092c-1e91-4a91-ad94-d979af50246b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Street Lighting 250 W HPS Opt. 1 L-1 Sector: Lighting Description: Option 1 refers to a Customer owned and installed fixture. The fixed monthly charge covers energy, operation and fixture maintenance fees. Possible Additional Fees include: Transfer of a street light, mast arm, overhead conductor, and conductor support to a new pole, and make necessary electrical connection: $175 each.

252

Data:1c6d0786-19e8-4f1e-8606-16af66e281fd | Open Energy Information  

Open Energy Info (EERE)

786-19e8-4f1e-8606-16af66e281fd 786-19e8-4f1e-8606-16af66e281fd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Membership Corporation Effective date: 2009/07/01 End date if known: Rate name: SUBDIVISION STREET LIGHTING Sodium Vapor, Enclosed w/pole-10 customers Sector: Lighting Description: 9,500 Lumens, 100 W, 1 light per 10 customers. Availability - Available to individual consumers, in all territory served by the Cooperative, for purposes of residential subdivision street lighting from dusk to dawn. Service under this schedule is subject to the Cooperative's established Service Rules and Regulations

253

Data:326f24e0-1af5-4688-b0b8-78c66bdc6aca | Open Energy Information  

Open Energy Info (EERE)

e0-1af5-4688-b0b8-78c66bdc6aca e0-1af5-4688-b0b8-78c66bdc6aca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- (1000W SV on existing 45 ft. wood Pole- Overheard Wiring) Sector: Lighting Description: This rate schedule is available on an annual basis to any customer for illumination of outdoor areas. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

254

Data:E6e78ce6-aaba-4fcc-8c35-7a684a841af4 | Open Energy Information  

Open Energy Info (EERE)

ce6-aaba-4fcc-8c35-7a684a841af4 ce6-aaba-4fcc-8c35-7a684a841af4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lea County Electric Coop, Inc Effective date: 2009/08/30 End date if known: Rate name: Small Commercial Service - Single Phase Sector: Commercial Description: Available system wide for all single phase service 25 kW or less for all nonresidential use not specified in cooperative's residential schedule. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

255

Data:Dc9e791e-af08-4d85-a1a6-d92cbd997adb | Open Energy Information  

Open Energy Info (EERE)

e791e-af08-4d85-a1a6-d92cbd997adb e791e-af08-4d85-a1a6-d92cbd997adb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Davenport, Nebraska (Utility Company) Effective date: 2012/11/11 End date if known: Rate name: Directional Lighting MV 400 W Sector: Lighting Description: Area/directional lighting of farmyards, backyards, patios, parking lots, storage yards, trailer courts, industrial sites, schools churches, apartments, businesses and many other applications where lighting is needed for identification, merchandising, environment, aesthetics, safety, security, protection or convenience.

256

Data:F36534c7-7566-403d-af04-a2ac4da0b4b2 | Open Energy Information  

Open Energy Info (EERE)

4c7-7566-403d-af04-a2ac4da0b4b2 4c7-7566-403d-af04-a2ac4da0b4b2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Mississippi Elec Pwr Assn Effective date: 2012/12/01 End date if known: Rate name: LIGHTING--SCHEDULE LS--Rate SL 100 watt Town & Country HPS on Aluminum Pole (URD) Sector: Lighting Description: Availability A member must be receiving electric service to be eligible for a security light at that location. \ Character of Service Mercury Vapor, High Pressure Sodium Metal Halide light, or Sodium Edison III controlled by a photoelectric switch so as to provide light from sundown to sunup.

257

Data:56a3f20a-7cc2-4794-b563-9f75d355af9a | Open Energy Information  

Open Energy Info (EERE)

a-7cc2-4794-b563-9f75d355af9a a-7cc2-4794-b563-9f75d355af9a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2006/03/06 End date if known: Rate name: Private Lighting - North - 1000W MV MP - Billed Use Sector: Lighting Description: Source or reference: www.midamericanenergy.com/include/pdf/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

258

Data:F6da941f-6e27-468a-af81-afb4e26f9cb2 | Open Energy Information  

Open Energy Info (EERE)

41f-6e27-468a-af81-afb4e26f9cb2 41f-6e27-468a-af81-afb4e26f9cb2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Mississippi Elec Pwr Assn Effective date: 2012/12/01 End date if known: Rate name: LIGHTING--SCHEDULE LS--Rate SL 400 watt High Pressure Sodium Flood or Metal Halide Sector: Lighting Description: Availability A member must be receiving electric service to be eligible for a security light at that location. Character of Service Mercury Vapor, High Pressure Sodium Metal Halide light, or Sodium Edison III controlled by a photoelectric switch so as to provide light from sundown to sunup.

259

Data:404aa0b3-6148-4a79-83af-6d680e131a6c | Open Energy Information  

Open Energy Info (EERE)

b3-6148-4a79-83af-6d680e131a6c b3-6148-4a79-83af-6d680e131a6c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: C & L Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Street Lighting (175 W MVL) Sector: Lighting Description: Available to towns and villages in the Cooperative area for street lighting. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

260

Data:21d6177a-e459-4aa5-ae49-5af6c880ca65 | Open Energy Information  

Open Energy Info (EERE)

d6177a-e459-4aa5-ae49-5af6c880ca65 d6177a-e459-4aa5-ae49-5af6c880ca65 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Indiana Gas & Elec Co Effective date: 2011/05/03 End date if known: Rate name: OL - 400 watt MV Sector: Lighting Description: AVAILABILITY This Rate Schedule shall be available throughout Company's Service Area, subject to the availability of adequate facilities and power supplies, which determinations shall be within Company's reasonable discretion. APPLICABILITY This Rate Schedule shall be applicable for outdoor lighting to any Customer including Community Organizations or Real Estate Developers.

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Data:9001ecda-5d45-4ec7-af6c-20c02249f838 | Open Energy Information  

Open Energy Info (EERE)

1ecda-5d45-4ec7-af6c-20c02249f838 1ecda-5d45-4ec7-af6c-20c02249f838 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Harmon Electric Assn Inc Effective date: 2010/04/25 End date if known: Rate name: Controllable Irrigation, 76 to 100 HP Sector: Commercial Description: * Available to members of the Cooperative for pump irrigation service located adjacent to its three-phase lines. Total load during peak period for up to four(4) hours per day and not to exceed 30 days per year. Subject to Power Factor Adjustment. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW)

262

Data:A7831d45-70f6-46b5-af0d-392eb415f1a4 | Open Energy Information  

Open Energy Info (EERE)

A7831d45-70f6-46b5-af0d-392eb415f1a4 A7831d45-70f6-46b5-af0d-392eb415f1a4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lansing, Michigan (Utility Company) Effective date: 2011/03/01 End date if known: Rate name: CUSTOMER OWNED SYSTEMS (High Pressure Sodium Luminaire 400 W) Sector: Lighting Description: Available to any political subdivision or agency of the State of Michigan for street lighting service for any system consisting of one or more luminaires where the BWL has an existing distribution system available. Source or reference: http://www.lansingmi.gov/Lansing/clerk/BWL_Proposed.pdf

263

Data:Df0d92ae-69af-4781-be80-f05de9cabb68 | Open Energy Information  

Open Energy Info (EERE)

ae-69af-4781-be80-f05de9cabb68 ae-69af-4781-be80-f05de9cabb68 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Yard Lighting Metered Sector: Lighting Description: *Subject to production cost adjustment. Pole rental for lights/equipment = $1.30 Source or reference: http://www.ci.gothenburg.ne.us/Ordinances/2010_Current/868%20Utility%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

264

Data:24138cf0-4e6a-4f02-a4af-04c35752299c | Open Energy Information  

Open Energy Info (EERE)

cf0-4e6a-4f02-a4af-04c35752299c cf0-4e6a-4f02-a4af-04c35752299c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Polk County Rural Pub Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Irrigation CYC 1 - five 1/2 day - Three Phase Sector: Industrial Description: Source or reference: Illinois State University binder #10. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3

265

Data:Ea67650e-cd43-4250-9845-368dea7b0af0 | Open Energy Information  

Open Energy Info (EERE)

7650e-cd43-4250-9845-368dea7b0af0 7650e-cd43-4250-9845-368dea7b0af0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2011/02/01 End date if known: Rate name: Lighting Service--Schedule L-1 Mercury Vapor Lamp- Area Lighting Luminaire (400w) Sector: Lighting Description: Available to Members, governments, agencies, public and private organizations desiring Electric Delivery or Electric Supply and Delivery Services through unmetered services for roadway and area lighting. Source or reference: http://www.delaware.coop/my-services/residential/billing/rates

266

Data:9cbd1d7d-e255-47ce-8bbb-b832b38331af | Open Energy Information  

Open Energy Info (EERE)

cbd1d7d-e255-47ce-8bbb-b832b38331af cbd1d7d-e255-47ce-8bbb-b832b38331af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Indiana Gas & Elec Co Effective date: 2011/05/03 End date if known: Rate name: DR - Miso Demand Response Rider Sector: Description: AVAILABILITY This Rider shall be available throughout Company's Service Area. Company reserves the right to limit total MW participation in this Rider as set forth in the applicable Midwest Independent System Operator (MISO) Business Practices Manuals (BPM) or as required by Company. This Rider is effective on and after July 1, 2011.

267

Data:4545db7a-6763-4efc-b081-14b200af2685 | Open Energy Information  

Open Energy Info (EERE)

db7a-6763-4efc-b081-14b200af2685 db7a-6763-4efc-b081-14b200af2685 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Black River Falls, Wisconsin (Utility Company) Effective date: 2010/04/15 End date if known: Rate name: Street Lighting - Ms-1 - City Owned Lights 400 W HPS Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. The utility will install and maintain street lighting units. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=550 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

268

Data:Ea588254-c750-4af0-9118-5efdf4ba2efc | Open Energy Information  

Open Energy Info (EERE)

54-c750-4af0-9118-5efdf4ba2efc 54-c750-4af0-9118-5efdf4ba2efc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: INSTITIONAL SERVICE RATE 135000 NON ELECTRIC Sector: Commercial Description: Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

269

Data:79c23c5a-a2cf-4af5-97c5-82bab607f163 | Open Energy Information  

Open Energy Info (EERE)

c5a-a2cf-4af5-97c5-82bab607f163 c5a-a2cf-4af5-97c5-82bab607f163 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Tennessee (Utility Company) Effective date: 2011/04/01 End date if known: Rate name: residential rate-- schedule RS Sector: Residential Description: Hydro Allocation credit: $1.60 per month The reported energy charges shall be decreased or increased in accordance with the current Adjustment Addendum published by TVA. Source or reference: http://www.clevelandutilities.com/PDF/2011JulyElectricRates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

270

Data:D2acb3d9-a206-4c5c-af62-138b40a66548 | Open Energy Information  

Open Energy Info (EERE)

d9-a206-4c5c-af62-138b40a66548 d9-a206-4c5c-af62-138b40a66548 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Co Effective date: 2012/06/08 End date if known: Rate name: Metal Melting Primary Pilot Rate Sector: Industrial Description: Subject to any restrictions, this experimental Metal Melting Primary Pilot Rate (MMPP) is available to any Full Service electric metal melting customer taking service at the Company's Primary Voltage levels, where the electric load on this rate is utilitized for industrial metal melting processes such as electric arc or induction furnaces. This rate is limited to existing metal melting

271

Data:E1eacae5-9a6c-4382-9ef2-af1bcdb59b01 | Open Energy Information  

Open Energy Info (EERE)

eacae5-9a6c-4382-9ef2-af1bcdb59b01 eacae5-9a6c-4382-9ef2-af1bcdb59b01 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Foley Board of Utilities Effective date: 2012/03/01 End date if known: Rate name: Public Street and Highway Lighting- Utility-Owned Fixtures- 47,000 Lumen High Pressure Sodium - Installed after 1989 Sector: Lighting Description: This rate is available to any municipality in which the Utility operates the local electric distribution system or to Baldwin County or to the State of Alabama for service along any highway adjacent to an electric distribution system of the Utility.

272

Data:Ad879430-fff1-43c2-ab8c-3af865e1ab27 | Open Energy Information  

Open Energy Info (EERE)

fff1-43c2-ab8c-3af865e1ab27 fff1-43c2-ab8c-3af865e1ab27 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Crisp County Power Comm Effective date: 2012/04/01 End date if known: Rate name: Local Government Rate-Flashers and Signal Lights (4-way Signal) Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

273

Data:6c244ff1-74c9-4dd0-af64-066630f270da | Open Energy Information  

Open Energy Info (EERE)

-74c9-4dd0-af64-066630f270da -74c9-4dd0-af64-066630f270da No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Tennessee (Utility Company) Effective date: 2011/04/01 End date if known: Rate name: Time-of-Use General Power Rate-- Schedule TGSA Sector: Commercial Description: Source or reference: http://www.clevelandutilities.com/PDF/2011JulyElectricRates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

274

Data:0582f8e0-3494-4812-a43a-f9429f24ea1b | Open Energy Information  

Open Energy Info (EERE)

f8e0-3494-4812-a43a-f9429f24ea1b f8e0-3494-4812-a43a-f9429f24ea1b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Street Lighting District Owned 100 HPS Sector: Lighting Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

275

Data:E6dca693-6694-4fac-ab96-4af30a9659d9 | Open Energy Information  

Open Energy Info (EERE)

dca693-6694-4fac-ab96-4af30a9659d9 dca693-6694-4fac-ab96-4af30a9659d9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elk Point, South Dakota (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Security Lights- (400W) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

276

Data:60550c37-bfd4-4a7d-bf28-135c4a077af4 | Open Energy Information  

Open Energy Info (EERE)

c37-bfd4-4a7d-bf28-135c4a077af4 c37-bfd4-4a7d-bf28-135c4a077af4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indiana Michigan Power Co (Michigan) Effective date: 2013/01/01 End date if known: Rate name: ECLS - 100 Watt MV - Open Access Sector: Lighting Description: Energy Conversation Lighting Service Available for streetlighting service to municipalities, counties, and other governmental subdivisions. This rate is applicable for service that is supplied through new or rebuilt streetlight systems, including extension of streetlighting systems to additional locations where service is requested by customer.

277

Data:53b5e82a-0cc5-4593-af8a-74a3056e949c | Open Energy Information  

Open Energy Info (EERE)

a-0cc5-4593-af8a-74a3056e949c a-0cc5-4593-af8a-74a3056e949c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pioneer Electric Coop, Inc (Alabama) Effective date: 2012/03/27 End date if known: Rate name: Schedule B12-Three Phase Sector: Commercial Description: *Applies to accounting schedules 442.1 Small Commercial and RGS Rural Commercial; and 442.1 Municipal Water Pumping. Subject to Energy Cost Adjustment. Source or reference: http://www.pioneerelectric.coop/documents/tariff-schedules.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

278

Data:7d13fb65-8185-4ccd-9549-7bed5af1a556 | Open Energy Information  

Open Energy Info (EERE)

5-8185-4ccd-9549-7bed5af1a556 5-8185-4ccd-9549-7bed5af1a556 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alaska Village Elec Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Residential Rate: Holy Cross Village Sector: Residential Description: For 1-500 kWh consumed: Fate = ( .30 + Cost of Fuel) - (PCE Adjustment) For 501-700 kWh consumed: Rate = (.30 + Cost of Fuel) Over 700 kWh consumed: Rate = (.20 + Cost of Fuel) Source or reference: http://www.avec.org/customer-service.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

279

Data:1a245ea5-2a28-477f-af28-94f279cd5e1a | Open Energy Information  

Open Energy Info (EERE)

ea5-2a28-477f-af28-94f279cd5e1a ea5-2a28-477f-af28-94f279cd5e1a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- (250W SV Directional Flood Lighting on existing 35 ft. steel Pole- Overheard Wiring) Sector: Lighting Description: This rate schedule is available on an annual basis to any customer for illumination of outdoor areas. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

280

Data:6d76997d-df8d-4c4a-adf1-af446a3d5a33 | Open Energy Information  

Open Energy Info (EERE)

7d-df8d-4c4a-adf1-af446a3d5a33 7d-df8d-4c4a-adf1-af446a3d5a33 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Raton Public Service Company Effective date: End date if known: Rate name: Security Lights 2- Prompt Payment Discount Sector: Lighting Description: Security lights are available to all (except as noted) residential, commercial and industrial customers served by the Raton Public Service Company for outside lighting purposes at the voltage and phase of the company's distribution system. RPS owns fixture and power is furnished by customer. RPS furnishes parts & service. Source or reference: Rates Binder 5B (Illinois State University)

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Data:E897dc33-5dfc-4217-bf67-365c9eca8af2 | Open Energy Information  

Open Energy Info (EERE)

dc33-5dfc-4217-bf67-365c9eca8af2 dc33-5dfc-4217-bf67-365c9eca8af2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Carolina Pub Serv Auth Effective date: 2012/12/01 End date if known: Rate name: L-12 - LARGE LIGHT AND POWER Sector: Industrial Description: Source or reference: https://www.santeecooper.com/portal/page/portal/SanteeCooper/MyBusiness/documents/1%20L-09.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

282

Data:E0e8e48a-b0b7-48e6-af1f-249600fe111d | Open Energy Information  

Open Energy Info (EERE)

8a-b0b7-48e6-af1f-249600fe111d 8a-b0b7-48e6-af1f-249600fe111d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2006/03/06 End date if known: Rate name: Private Lighting - North - 250W HPS Sector: Lighting Description: Source or reference: www.midamericanenergy.com/include/pdf/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

283

Data:Fdbc3859-de27-42f7-bd0b-8af1b008c3b5 | Open Energy Information  

Open Energy Info (EERE)

Fdbc3859-de27-42f7-bd0b-8af1b008c3b5 Fdbc3859-de27-42f7-bd0b-8af1b008c3b5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mascoutah, Illinois (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Customer Area Lighting Service- Rate 7: Directional Lighting, Metal Halide, 40,000 Lumen, 400 Watt Sector: Lighting Description: Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

284

Data:42a4ad0f-841b-4591-a1af-0559d3b40c6b | Open Energy Information  

Open Energy Info (EERE)

f-841b-4591-a1af-0559d3b40c6b f-841b-4591-a1af-0559d3b40c6b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Williams - AZ, Arizona (Utility Company) Effective date: End date if known: Rate name: Dusk to Dawn Lighting Service(90 W LPS)-pole Sector: Lighting Description: Where city installs, owns, and operates and maintains lighting facilities. Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

285

Data:A4aa3092-2a9e-4002-af73-bc1f42951545 | Open Energy Information  

Open Energy Info (EERE)

aa3092-2a9e-4002-af73-bc1f42951545 aa3092-2a9e-4002-af73-bc1f42951545 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Woodruff Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Outdoor lighting - Street Lights (Muncipal Owned) 250 W HPS, Metal pole Sector: Lighting Description: To unmetered automatically controlled outdoor lighting service burning all night. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

286

Data:F05501ce-540b-491a-8fd2-af084a9df7f3 | Open Energy Information  

Open Energy Info (EERE)

ce-540b-491a-8fd2-af084a9df7f3 ce-540b-491a-8fd2-af084a9df7f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Public Pwr Dist Effective date: 2012/05/01 End date if known: Rate name: Area&Directional Lighting Service Rate N725 - Fringe Sector: Lighting Description: Source or reference: Illinois State University Rate Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

287

Data:4f784416-812f-49d4-9372-518bf243af5f | Open Energy Information  

Open Energy Info (EERE)

4416-812f-49d4-9372-518bf243af5f 4416-812f-49d4-9372-518bf243af5f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Intermountain Rural Elec Assn Effective date: 2013/02/01 End date if known: Rate name: Residential Incorporated City or Town Service Time of Use (CS-TOU) Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1

288

Data:3d73fc34-88d1-4ff3-a860-af1831b16597 | Open Energy Information  

Open Energy Info (EERE)

8d1-4ff3-a860-af1831b16597 8d1-4ff3-a860-af1831b16597 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule LO Lighting - Outdoor Area-175 watt mercury vapor lamp Sector: Lighting Description: Applicability This schedule is applicable to outdoor area lighting service for the illumination of areas where the District furnishes, installs, owns, operates and maintains the complete lighting installation. Monthly Usage: 70kWh Source or reference: http://www.tid.org/sites/default/files/documents/tidweb_content/Schedule%20LO%20_2009_.pdf

289

Data:D698977a-ad0b-46d7-ad11-aa6af1333ec9 | Open Energy Information  

Open Energy Info (EERE)

7a-ad0b-46d7-ad11-aa6af1333ec9 7a-ad0b-46d7-ad11-aa6af1333ec9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Readsboro, Vermont (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Residential Rate 11 Sector: Residential Description: Service under this rate is available as an alternative to Rate 01 for single-phase electric service at secondary voltage in residences, individual apartments and farms at service locations taking service under this rate prior to April 1, 1989. The availability of this rate shall be at the Company's discretion. Source or reference: http://www.greenmountainpower.com/customers/payment/gmp-rates/

290

Data:F057d3a3-5143-4ea9-ace6-af4085d71a29 | Open Energy Information  

Open Energy Info (EERE)

a3-5143-4ea9-ace6-af4085d71a29 a3-5143-4ea9-ace6-af4085d71a29 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Area Lighting - HPS-L 200W Sector: Lighting Description: Public Purposes Rider = base rate x %2.85. Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

291

Data:D5f5af00-b065-41ed-a073-cec607a716ad | Open Energy Information  

Open Energy Info (EERE)

f5af00-b065-41ed-a073-cec607a716ad f5af00-b065-41ed-a073-cec607a716ad No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bangor Hydro-Electric Co Effective date: 2012/07/01 End date if known: Rate name: Municipal Incandescent-189 watts Sector: Lighting Description: Energy service only to municipalities owning, operating, and maintaining a street lighting system and limited to locations where secondary service is available. Traffic control lighting service may be rendered under this rate providing the customer furnishes the equipment. Customers taking service under this rate schedule are responsible for paying both Distribution Service and Stranded Cost.

292

Data:0dd9a245-0e2c-4f63-b688-ed8d55fe5af7 | Open Energy Information  

Open Energy Info (EERE)

0dd9a245-0e2c-4f63-b688-ed8d55fe5af7 0dd9a245-0e2c-4f63-b688-ed8d55fe5af7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rappahannock Electric Coop Effective date: End date if known: Rate name: LARGE POWER SUBSTATION DIRECT SERVICE SCHEDULE LP-3_1 Sector: Industrial Description: Available in all territory served by the Cooperative, subject to the Terms and conditions of the Cooperative on file with the Virginia State Corporation Commission. see source for more information. Source or reference: www.myrec.coop/content-documents/ScheduleLP-3-Nv09.pdf Source Parent: Comments Applicability Demand (kW)

293

Data:E048d107-159c-487c-9109-ba295af2f003 | Open Energy Information  

Open Energy Info (EERE)

7-159c-487c-9109-ba295af2f003 7-159c-487c-9109-ba295af2f003 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Richland Electric Coop Effective date: End date if known: Rate name: Large Commercial- Industrial Service Sector: Commercial Description: A facility charge of $.5 per kVa is applied to this rate Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

294

Data:C882dcc9-9323-45d9-91ce-0fbd5107c3af | Open Energy Information  

Open Energy Info (EERE)

dcc9-9323-45d9-91ce-0fbd5107c3af dcc9-9323-45d9-91ce-0fbd5107c3af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2012/02/01 End date if known: Rate name: Schedule CE Commercial Service - Energy Under 35 kW Sector: Commercial Description: Applicability This schedule applies to general power use with a demand of less than 35 kW for the following: (1) commercial and industrial customers for general power use and (2) other services where other Rate Schedules (other than Rate Schedules NM and SG) do not apply. This schedule is applicable on an annual basis only.

295

Data:95ec7fef-37e1-4e0c-812b-4af39577ab94 | Open Energy Information  

Open Energy Info (EERE)

fef-37e1-4e0c-812b-4af39577ab94 fef-37e1-4e0c-812b-4af39577ab94 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwest Rural Elec Assn Inc Effective date: 2010/11/01 End date if known: Rate name: Irrigation Year 4 Sector: Commercial Description: * Requires special equipment from SWRE and load management by the member between 4pm and 8pm,June 20- September 9 each year. Minimum:Higher of facilities charge plus kW/Demand charge of $96 per year. All bills are adjusted by applicable taxes. Summer rates cover May- October and Winter cover November- April. Source or reference: Rate binder # 4(Illinios State University)

296

Data:B560d64c-37ab-48a4-87d6-9ef08af93ede | Open Energy Information  

Open Energy Info (EERE)

d64c-37ab-48a4-87d6-9ef08af93ede d64c-37ab-48a4-87d6-9ef08af93ede No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- (1000W MH Directional Flood Lighting on existing 45 ft. metal pole- Underground Wiring) Sector: Lighting Description: This rate schedule is available on an annual basis to any customer for illumination of outdoor areas. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

297

Data:Cae03864-ad1f-42dc-af6f-528d06e61c1c | Open Energy Information  

Open Energy Info (EERE)

Cae03864-ad1f-42dc-af6f-528d06e61c1c Cae03864-ad1f-42dc-af6f-528d06e61c1c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alabama Power Co Effective date: 2009/01/01 End date if known: Rate name: 100 W METAL HALIDE DECORATIVE Sector: Lighting Description: Source or reference: http://www.alabamapower.com/pricing/pdf/FPL.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

298

Data:D848af5b-4475-4a42-80fd-7835dc1b5e35 | Open Energy Information  

Open Energy Info (EERE)

8af5b-4475-4a42-80fd-7835dc1b5e35 8af5b-4475-4a42-80fd-7835dc1b5e35 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2010/11/01 End date if known: Rate name: AREA LIGHTING SPECIAL RATE FOR LIGHTS - Area Lights 200w Sector: Lighting Description: "SPECIAL RATE FOR LIGHTS CONNECTED BEHIND CUSTOMER'S METER" Available to all customers for dusk to dawn outdoor area lighting not served under street lighting contract. Service under this schedule is also available for television amplifiers for cable systems, and other flat rate services. Special Poles $ 1.00 per month

299

Data:A2cff840-fffd-4abf-82dc-af266c3b98f2 | Open Energy Information  

Open Energy Info (EERE)

40-fffd-4abf-82dc-af266c3b98f2 40-fffd-4abf-82dc-af266c3b98f2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL- HPS 150w Sector: Lighting Description: Applicable to the Colorado Department of Transportation and municipalities for Customer-Owned Lighting Service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

300

Data:8ad8d67a-f5eb-47e3-a93f-6e0e464fceef | Open Energy Information  

Open Energy Info (EERE)

ad8d67a-f5eb-47e3-a93f-6e0e464fceef ad8d67a-f5eb-47e3-a93f-6e0e464fceef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln County Power Dist No 1 Effective date: 2009/07/01 End date if known: Rate name: LARGE MUNICIPAL WATER PUMPING - RURAL Sector: Commercial Description: Applicable to all municipal water wells that use electric motors that are 200 horsepower or greater receiving service from the Lincoln County Power District No. 1's existing facilities, and which are located within the Rural System. Service shall be subject to the established rules and regulations of the Lincoln County Power District No. 1.

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Data:37e5c504-9839-4827-af9d-7f0577df9d25 | Open Energy Information  

Open Energy Info (EERE)

c504-9839-4827-af9d-7f0577df9d25 c504-9839-4827-af9d-7f0577df9d25 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Orangeburg, South Carolina (Utility Company) Effective date: 2008/10/01 End date if known: Rate name: 2LS10 - 9,500 Lumens (HPS) Open Type Globe, Overhead wiring Sector: Lighting Description: The following is the rate schedule for lights installed for customers on the Department's standard poles which are a part of the Department's distribution system. Source or reference: http://www.orbgdpu.com/PDF%20files/Electric%20-%20Code%202L,2P,2U%20-%20Overhead%20Private%20Lights.pdf

302

Data:3b97fbcc-e840-4c5d-9834-abbfc846af20 | Open Energy Information  

Open Energy Info (EERE)

fbcc-e840-4c5d-9834-abbfc846af20 fbcc-e840-4c5d-9834-abbfc846af20 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Reedsburg Utility Comm Effective date: 2011/06/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

303

Data:F55ef57f-48ec-49a0-98b3-0604af6a4e54 | Open Energy Information  

Open Energy Info (EERE)

7f-48ec-49a0-98b3-0604af6a4e54 7f-48ec-49a0-98b3-0604af6a4e54 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indiana Michigan Power Co (Michigan) Effective date: 2013/01/01 End date if known: Rate name: ECLS - 100 Watt HPS - Open Access Sector: Lighting Description: Energy Conversation Lighting Service Available for streetlighting service to municipalities, counties, and other governmental subdivisions. This rate is applicable for service that is supplied through new or rebuilt streetlight systems, including extension of streetlighting systems to additional locations where service is requested by customer.

304

Data:Ecf5a9c2-29a0-460d-9af5-5baffcd56dfe | Open Energy Information  

Open Energy Info (EERE)

-29a0-460d-9af5-5baffcd56dfe -29a0-460d-9af5-5baffcd56dfe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Midwest Energy Inc Effective date: 2012/06/29 End date if known: Rate name: FSLS- HPS 100 Watt 44 kWh Sector: Lighting Description: Source or reference: http://www.mwenergy.com/elecrate.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

305

Data:E84d60af-2f83-4307-aef3-934349fa86ea | Open Energy Information  

Open Energy Info (EERE)

0af-2f83-4307-aef3-934349fa86ea 0af-2f83-4307-aef3-934349fa86ea No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salt River Project Effective date: 2012/11/01 End date if known: Rate name: E-57 STANDARD PRICE PLAN FOR PRIVATE SECURITY LIGHTING SERVICE Sector: Lighting Description: APPLICABILITY: Service under this price plan is applicable to un-metered lighting applications served from a photo cell device. Includes lighting of private residences; commercial applications (parking lots or otherwise); and other lighting applications that do not qualify for service under the E-56 Price Plan.

306

Data:52297410-d0ee-4a91-8c95-0af75c739b52 | Open Energy Information  

Open Energy Info (EERE)

d0ee-4a91-8c95-0af75c739b52 d0ee-4a91-8c95-0af75c739b52 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Story City, Iowa (Utility Company) Effective date: 2004/01/01 End date if known: Rate name: High Pressure - 250 Watt - Not metered Sector: Lighting Description: Source or reference: Ted binder 1 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

307

Data:Ae91e60a-baeb-4a05-ad0b-29611af26acc | Open Energy Information  

Open Energy Info (EERE)

1e60a-baeb-4a05-ad0b-29611af26acc 1e60a-baeb-4a05-ad0b-29611af26acc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Edmond, Oklahoma (Utility Company) Effective date: 2009/09/30 End date if known: Rate name: Additional charges-Extension of Secondary Circuit and Wood Pole-40 Sector: Commercial Description: Source or reference: http://edmondok.com/DocumentCenter/Home/View/442 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

308

Data:Dea75df5-1338-4a6f-af26-0cfb847da8ba | Open Energy Information  

Open Energy Info (EERE)

Dea75df5-1338-4a6f-af26-0cfb847da8ba Dea75df5-1338-4a6f-af26-0cfb847da8ba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Woodruff Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Outdoor lighting - Security Lamps 175 W MH Sector: Lighting Description: To unmetered automatically controlled outdoor lighting service burning all night. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

309

Data:E92f920e-e3e3-4012-95af-4356b60cf3a3 | Open Energy Information  

Open Energy Info (EERE)

e-e3e3-4012-95af-4356b60cf3a3 e-e3e3-4012-95af-4356b60cf3a3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: Schedule H-1 - High Intensity Discharge 1500 Watts - Continuous Sector: Lighting Description: Source or reference: www.mytpu.org/file_viewer.aspx?id=6170 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

310

Data:878e2372-c670-42c3-88f8-af17bb41a7dd | Open Energy Information  

Open Energy Info (EERE)

72-c670-42c3-88f8-af17bb41a7dd 72-c670-42c3-88f8-af17bb41a7dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp (Tennessee) Effective date: 2013/06/01 End date if known: Rate name: Residential Sector: Residential Description: Source or reference: http://www.tcemc.org/index.php/residential-information/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

311

Data:190dd70b-af20-4cb5-855a-fa6413ba301f | Open Energy Information  

Open Energy Info (EERE)

b-af20-4cb5-855a-fa6413ba301f b-af20-4cb5-855a-fa6413ba301f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Interstate Power and Light Co Effective date: 2011/02/25 End date if known: Rate name: Street Lighting Service (45 KWH) Sector: Lighting Description: Available to municipalities, Iowa Department of Transportation, county governments, and other public bodies for the lighting of public highways, streets, alleys, and other thoroughfares. A proper written request from the municipality or government body is required prior to installation. Service hereunder is also subject to Company's Rules and Regulations.

312

Data:1c82e1ee-9fa5-4d4e-999a-f41247c2deee | Open Energy Information  

Open Energy Info (EERE)

ee-9fa5-4d4e-999a-f41247c2deee ee-9fa5-4d4e-999a-f41247c2deee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL- HPS 100w Sector: Lighting Description: Applicable to the Colorado Department of Transportation and municipalities for Customer-Owned Lighting Service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

313

Data:Ba7d8532-6e8b-4684-b446-32af671e4b7c | Open Energy Information  

Open Energy Info (EERE)

d8532-6e8b-4684-b446-32af671e4b7c d8532-6e8b-4684-b446-32af671e4b7c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Perennial Public Power Dist Effective date: 2013/01/01 End date if known: Rate name: Municipal Street Lighting 250w HPS Sector: Lighting Description: Municipal Street Lighting (Rate Code 64): For service supplied municipalities (or customers within the municipality) in the operation of the municipality's street lighting system, the following rates shall apply. These rates shall also apply to security lights in a municipality that are billed under other rate codes (i.e., 20, 57, etc.).

314

Data:72269117-fb4f-440a-8a19-84cd7af09e51 | Open Energy Information  

Open Energy Info (EERE)

7-fb4f-440a-8a19-84cd7af09e51 7-fb4f-440a-8a19-84cd7af09e51 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anaheim, California (Utility Company) Effective date: 2012/09/12 End date if known: Rate name: Lighting- Unmetered- 400W High Pressure Sodium Sector: Lighting Description: Applicable to street and highway lighting where customer owns and maintains street lighting equipment. Source or reference: http://www.anaheim.net/utilities/ElectricRules/SCHD-LS2.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

315

Data:Bdbdb3af-68ba-46e6-b940-9a3b3b811084 | Open Energy Information  

Open Energy Info (EERE)

Bdbdb3af-68ba-46e6-b940-9a3b3b811084 Bdbdb3af-68ba-46e6-b940-9a3b3b811084 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Carey, Ohio (Utility Company) Effective date: 1985/05/20 End date if known: Rate name: Residential Sector: Residential Description: Source or reference: http://www.conwaygreene.com/Carey/lpext.dll?f=templates&fn=main-hit-h.htm&2.0 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

316

Data:49726313-e3be-4c42-800c-f95f37af2d14 | Open Energy Information  

Open Energy Info (EERE)

6313-e3be-4c42-800c-f95f37af2d14 6313-e3be-4c42-800c-f95f37af2d14 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Imperial Irrigation District Effective date: 1998/01/01 End date if known: Rate name: SCHEDULE GL LARGE GENERAL SERVICE Sector: Industrial Description: APPLICABILITY Applicable to general service having a demand of 100 kilowatts or higher. Not applicable for standby, supplemental or resale service. Source or reference: http://www.iid.com/Modules/ShowDocument.aspx?documentid=2567 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

317

Data:91abbbf9-7adc-41b6-82c8-f1fb35af3b43 | Open Energy Information  

Open Energy Info (EERE)

abbbf9-7adc-41b6-82c8-f1fb35af3b43 abbbf9-7adc-41b6-82c8-f1fb35af3b43 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lexington, Tennessee (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Area Lighting service(250 Watt High Pressure Sodium) Sector: Lighting Description: Available to the individual Customer at locations on the City's distribution system. Source or reference: http://www.lexingtonnc.net/modules/showdocument.aspx?documentid=414 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

318

Data:Fd53ce3e-d24d-4494-900b-4af287f634fe | Open Energy Information  

Open Energy Info (EERE)

3ce3e-d24d-4494-900b-4af287f634fe 3ce3e-d24d-4494-900b-4af287f634fe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Mississippi Elec Pwr Assn Effective date: 2011/10/01 End date if known: Rate name: Schedule 87 - South System General Power Rate Time-of-Use Demand - Outdoor Lighting Sector: Commercial Description: This rate shall apply to the firm power requirements for electric service to outdoor lighting customers whose previous twelve month median demand is greater than 50 KW and less than or equal to 300 KW. Source or reference: ISU Documentation Source Parent: Comments Applicability

319

Data:Dc78fce7-4017-4ef0-9aac-235fc06e45af | Open Energy Information  

Open Energy Info (EERE)

Dc78fce7-4017-4ef0-9aac-235fc06e45af Dc78fce7-4017-4ef0-9aac-235fc06e45af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wild Rice Electric Coop, Inc Effective date: 2012/03/18 End date if known: Rate name: FARM AND HOME SERVICE - Up to 50 KVA transformer Sector: Residential Description: Source or reference: http://www.wildriceelectric.com/b-rate.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

320

Data:78c0e937-3ecd-4645-8a89-3c9a4af9a913 | Open Energy Information  

Open Energy Info (EERE)

7-3ecd-4645-8a89-3c9a4af9a913 7-3ecd-4645-8a89-3c9a4af9a913 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Nonmetered Memb Owns/Repairs HPS 400 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Data:F10937bf-d738-4172-97f9-cb5d5c62af14 | Open Energy Information  

Open Energy Info (EERE)

F10937bf-d738-4172-97f9-cb5d5c62af14 F10937bf-d738-4172-97f9-cb5d5c62af14 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Chambersburg, Pennsylvania (Utility Company) Effective date: 2004/05/03 End date if known: Rate name: Area Lighting Rate- (250W HPS) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

322

Data:D112d614-ddcd-4c70-b738-fe14bf683af1 | Open Energy Information  

Open Energy Info (EERE)

2d614-ddcd-4c70-b738-fe14bf683af1 2d614-ddcd-4c70-b738-fe14bf683af1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Waverly Municipal Elec Utility Effective date: End date if known: Rate name: Security Lighting: 150 Watt HPS Sector: Lighting Description: Application Area security lighting for residential and commercial customers shall be available at the security lighting rate schedule. The customer is required to sign up for the service for a minimum of one year. Character of Service Security lighting service shall be unmetered. The lights shall be owned and maintained by Waverly Light and Power and shall be located on Utility owned poles or structures. Related costs shall be paid by the customer.

323

Data:0e967d78-b2d6-4ac3-af00-eddb3965d71d | Open Energy Information  

Open Energy Info (EERE)

8-b2d6-4ac3-af00-eddb3965d71d 8-b2d6-4ac3-af00-eddb3965d71d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southern Maryland Elec Coop Inc Effective date: 2011/01/05 End date if known: Rate name: Large Power 3-Phase Commercial Sector: Commercial Description: Available to commercial and industrial Customers and all schools, churches and community halls throughout the area served by the Cooperative for all uses where the estimated capacity requirement is 1,000 KVA or more, subject to the established rules and regulations of the Cooperative. Source or reference: http://www.smeco.coop/documents/tariff.pdf

324

Data:328c1564-7286-4af5-9bad-8ad8f9fcdae0 | Open Energy Information  

Open Energy Info (EERE)

64-7286-4af5-9bad-8ad8f9fcdae0 64-7286-4af5-9bad-8ad8f9fcdae0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oregon Trail El Cons Coop, Inc Effective date: 2011/10/01 End date if known: Rate name: Sodium Vapor 200W (78kWh) Flood Light, Schedule AL Sector: Lighting Description: Available in OTEC service territory for outdoor area lighting installed on existing OTEC-owned facilities, subject to policies as established by the Board of Directors. Source or reference: http://www.otecc.com/rates.aspx Source Parent: Comments Rate is for photoelectric-operated fixtures operating approximately 4,100 hours per year.

325

Data:56bb7f81-32af-4e11-88df-c00bda3635a4 | Open Energy Information  

Open Energy Info (EERE)

f81-32af-4e11-88df-c00bda3635a4 f81-32af-4e11-88df-c00bda3635a4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wyandotte Municipal Serv Comm Effective date: 2011/10/01 End date if known: Rate name: PRIMARY SERVICE RATE (GREATER THAN 1000KW)(Time-Differentiated Meter) Sector: Commercial Description: To any customer desiring service for all power and lighting purposes served through a transformer of 500 kVA or more and when the customer furnishes, owns, installs, and maintains his own transformation facilities acceptable to WMS, and there is a maximum demonstrated demand of 1,000 KW to 4000 KW.

326

Data:6b2d2af5-4bc3-403a-879a-9908906d620c | Open Energy Information  

Open Energy Info (EERE)

af5-4bc3-403a-879a-9908906d620c af5-4bc3-403a-879a-9908906d620c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maui Electric Co Ltd Effective date: 2013/07/01 End date if known: Rate name: Maui-SCHEDULE F PUBLIC STREET LIGHTING-150/300 Watt Incandescent Sector: Lighting Description: Availability: Applicable to public street and highway lighting service supplied on the Island of Maui where the Company owns, maintains and operates the street lighting facilities. Minimum Charge: Fixture charge+$25.00 Source or reference: http://www.mauielectric.com/vcmcontent/FileScan/PDF/EnergyServices/Tarrifs/MECO/MauiRatesSchF.pdf

327

Data:48f800fa-1c0f-4e65-af12-7b8f44d19b8f | Open Energy Information  

Open Energy Info (EERE)

00fa-1c0f-4e65-af12-7b8f44d19b8f 00fa-1c0f-4e65-af12-7b8f44d19b8f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oahe Electric Coop Inc Effective date: 2009/01/01 End date if known: Rate name: Outdoor Lighting 250 W HPS: Unmetered Sector: Lighting Description: Available to individual consumers and municipalities, towns, and villages for dusk to dawn outdoor lighting in close proximity to existing overhead secondary circuits. South Dakota Sales Tax is applicable to this rate. Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW):

328

Data:1aafdbe6-840d-4c82-afb0-21076c4af8b2 | Open Energy Information  

Open Energy Info (EERE)

aafdbe6-840d-4c82-afb0-21076c4af8b2 aafdbe6-840d-4c82-afb0-21076c4af8b2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Imperial Irrigation District Effective date: 1998/01/01 End date if known: Rate name: SCHEDULE D RESIDENTIAL SERVICE Sector: Residential Description: APPLICABILITY Applicable to service for residential service to individual residences, dwellings and individually metered apartments, and to incidental farm service under Special Conditions(B). Service shall be supplied at one point of delivery and measured through one meter. Source or reference: http://www.iid.com/Modules/ShowDocument.aspx?documentid=2570

329

Data:90c6cc75-c74e-4830-a337-9af2fbedf8d9 | Open Energy Information  

Open Energy Info (EERE)

5-c74e-4830-a337-9af2fbedf8d9 5-c74e-4830-a337-9af2fbedf8d9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maine Public Service Co Effective date: 2012/01/01 End date if known: Rate name: Large Power service-Primary(E-P) Sector: Industrial Description: This rate is available to any industrial, commercial or general customer whose service is taken at primary voltage and whose maximum demand is at least 50 kilowatts but less than 500 kilowatts during any two of the five consecutive months from November through March and who is not taking service under Rate E-P-T. Contracts for 500 kilowatts or more must be in writing.

330

Data:E9e8a08b-c607-43a3-97cf-0afbef2a95af | Open Energy Information  

Open Energy Info (EERE)

a08b-c607-43a3-97cf-0afbef2a95af a08b-c607-43a3-97cf-0afbef2a95af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oregon Trail El Cons Coop, Inc Effective date: 2011/10/01 End date if known: Rate name: Municipal-Owned Lighting - Sodium Vapor 150W, Schedule ML Sector: Lighting Description: Available in OTEC service territory for OTEC-owned municipal and highway lighting installed on existing facilities, subject to policies as established by the Board of Directors. Source or reference: http://www.otecc.com/rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

331

Data:2b9af62e-7f95-4c2d-844e-2dbd9390ed2a | Open Energy Information  

Open Energy Info (EERE)

af62e-7f95-4c2d-844e-2dbd9390ed2a af62e-7f95-4c2d-844e-2dbd9390ed2a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2013/02/01 End date if known: Rate name: SPL Experimental Light Emitting Diode Cobra Head 250 W Sector: Lighting Description: The following rates shall be applied to the kWh Usage for the particular light type and size to determine the monthly charge per light. Source or reference: http://www.atlanticcityelectric.com/_res/documents/NJTariffSectionIV.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

332

Data:E009de20-4d2c-4e57-af0f-2099b37b6c59 | Open Energy Information  

Open Energy Info (EERE)

4d2c-4e57-af0f-2099b37b6c59 4d2c-4e57-af0f-2099b37b6c59 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Dover, Delaware (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Private Outdoor Lighting: Roadway/Area Lighting, Metered, 250 watt MV Sector: Lighting Description: "METERED- This classification will be available at the City's discretion and only when it is not feasible to install the lighting service from an unmetered source. These lights will have the energy supplied through the customers meter and the monthly rental fee shall be reduced to reflect this customers expense."

333

Data:12e4dd77-af6f-4921-9dc7-bbf52ea3a153 | Open Energy Information  

Open Energy Info (EERE)

dd77-af6f-4921-9dc7-bbf52ea3a153 dd77-af6f-4921-9dc7-bbf52ea3a153 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Two Rivers Water & Light Effective date: 2011/01/01 End date if known: Rate name: Street Lighting- 250W HPS- Overhead Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting units. The lighting pole charge applies if the lamp is on a dedicated pole that is not used to support the utility distribution system. Pole Charge: $3.00 per pole, per month. The Power Cost Adjustment Clause applies to this rate.

334

Data:C8978d96-ccca-4e1f-afe8-8122eba2af15 | Open Energy Information  

Open Energy Info (EERE)

78d96-ccca-4e1f-afe8-8122eba2af15 78d96-ccca-4e1f-afe8-8122eba2af15 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Washington, North Carolina (Utility Company) Effective date: 2009/10/01 End date if known: Rate name: Outdoor Lighting- 100W Metal Halide Flood- Existing Pole Sector: Lighting Description: Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

335

Data:B0572fcf-7387-448c-b026-9af74fa257cc | Open Energy Information  

Open Energy Info (EERE)

fcf-7387-448c-b026-9af74fa257cc fcf-7387-448c-b026-9af74fa257cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Coop Effective date: 2009/01/01 End date if known: Rate name: Rate Schedule MSL (Metered Security Lighting)(Standard fixtures 400 Watt) Sector: Lighting Description: Available to all cooperative members. 400 Watt HPS. Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

336

Data:F936b9f4-0442-4860-b4e6-4af17ad2e1b6 | Open Energy Information  

Open Energy Info (EERE)

6b9f4-0442-4860-b4e6-4af17ad2e1b6 6b9f4-0442-4860-b4e6-4af17ad2e1b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Security Lighting MV 175 W Sector: Lighting Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. Source or reference: http://www.singingriver.com/Files/R-18.pdf Source Parent: Comments Energy Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment Applicability Demand (kW) Minimum (kW): Maximum (kW):

337

Data:2bb5564e-25f4-49a0-af9d-6175cb16f68e | Open Energy Information  

Open Energy Info (EERE)

564e-25f4-49a0-af9d-6175cb16f68e 564e-25f4-49a0-af9d-6175cb16f68e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Steuben County Rural E M C Effective date: 2012/02/01 End date if known: Rate name: Security and Street Light Services: High Pressure Sodium 100W Sector: Lighting Description: Security and Street Light Services: High Pressure Sodium 100W. Lamps Owned and maintained by the Corporation. Source or reference: http://www.remcsteuben.com/sites/remcsteuben.coopwebbuilder.com/files/current_rate_schedule-_03-2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

338

Data:0b69f86b-5c36-4af2-b736-ccd9d8074c6a | Open Energy Information  

Open Energy Info (EERE)

5c36-4af2-b736-ccd9d8074c6a 5c36-4af2-b736-ccd9d8074c6a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Little Ocmulgee El Member Corp Effective date: 2009/01/01 End date if known: Rate name: 400 watt HPS, MV, MH - Directional, Non-Metered Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Additional fees may be charged Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

339

Data:89aced84-c9f9-43de-a576-f048ace977af | Open Energy Information  

Open Energy Info (EERE)

aced84-c9f9-43de-a576-f048ace977af aced84-c9f9-43de-a576-f048ace977af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Howard Greeley Rural P P D Effective date: End date if known: Rate name: Schedule V town residential and commercial Sector: Commercial Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

340

Data:B7c7d80c-bf58-466f-82bb-566ac3c36af0 | Open Energy Information  

Open Energy Info (EERE)

d80c-bf58-466f-82bb-566ac3c36af0 d80c-bf58-466f-82bb-566ac3c36af0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Trico Electric Cooperative Inc Effective date: 2009/08/01 End date if known: Rate name: Street Lighting-180 Watt LPS Sector: Commercial Description: *Applicable for lighting public streets,alleys and public parks. Subject to tax and wholesale power cost. Source or reference: http://www.trico.coop/images/TRICO_SL1.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Data:2c4af026-56fa-44bf-93f0-007bc0646751 | Open Energy Information  

Open Energy Info (EERE)

af026-56fa-44bf-93f0-007bc0646751 af026-56fa-44bf-93f0-007bc0646751 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Davenport, Nebraska (Utility Company) Effective date: 2012/11/11 End date if known: Rate name: Area Lighting MV 175 Watt Metered Sector: Lighting Description: Area/directional lighting of farmyards, backyards, patios, parking lots, storage yards, trailer courts, industrial sites, schools churches, apartments, businesses and many other applications where lighting is needed for identification, merchandising, environment, aesthetics, safety, security, protection or convenience.

342

Data:C98d8551-b87e-475f-a90b-127018426af9 | Open Energy Information  

Open Energy Info (EERE)

d8551-b87e-475f-a90b-127018426af9 d8551-b87e-475f-a90b-127018426af9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Leavenworth-Jefferson E C, Inc Effective date: 2010/05/01 End date if known: Rate name: Single Phase General Service Sector: Commercial Description: This rate is available for single phase service of single character. Single Phase, alternating current, 60 cycle, available voltage. Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

343

Data:5d66b6af-3977-449d-a71d-e628a0bfde49 | Open Energy Information  

Open Energy Info (EERE)

6b6af-3977-449d-a71d-e628a0bfde49 6b6af-3977-449d-a71d-e628a0bfde49 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Somerset Rural Elec Coop, Inc Effective date: 2000/04/15 End date if known: Rate name: Interruptible Service Rider, Industrial Sector: Industrial Description: * Available to consumers upon request taking service under schedule LP and contracting for a generation and transmission load of 100kW or more. Monthly Interruptibilite Capacity Credit shall not apply unless the consumer's interruptible demand is at least 50 kW. Source or reference: Rate binder # 4(Illinios State University)

344

Data:963d8ace-d08d-487d-8f71-45bf39af9c00 | Open Energy Information  

Open Energy Info (EERE)

ace-d08d-487d-8f71-45bf39af9c00 ace-d08d-487d-8f71-45bf39af9c00 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alabama Power Co Effective date: 2009/01/01 End date if known: Rate name: 100 W HIGH PRESSURE OFF ROAD LUMINIARIES Sector: Lighting Description: Source or reference: http://www.alabamapower.com/pricing/pdf/FPL.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

345

Data:6c0893bc-c5c0-41af-8b16-3a14657cc090 | Open Energy Information  

Open Energy Info (EERE)

bc-c5c0-41af-8b16-3a14657cc090 bc-c5c0-41af-8b16-3a14657cc090 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coos-Curry Electric Coop, Inc Effective date: 2011/12/22 End date if known: Rate name: Security Lighting, 200 Watt HPSF Sector: Lighting Description: * For yard or security lighting. Source or reference: Rate binder #4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

346

Data:Fdaeb9af-0027-4d11-a9b9-5acec97f58ab | Open Energy Information  

Open Energy Info (EERE)

Fdaeb9af-0027-4d11-a9b9-5acec97f58ab Fdaeb9af-0027-4d11-a9b9-5acec97f58ab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Coop Effective date: 2009/01/01 End date if known: Rate name: Rate Schedule SL (Security Lighting) (Standard Fixtures 400 Watt HPS) Sector: Lighting Description: Available to all cooperative members. Standard fixtures 400 watt HPS. Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

347

Data:35304023-af4d-4256-97e9-4d5bb83aab01 | Open Energy Information  

Open Energy Info (EERE)

-af4d-4256-97e9-4d5bb83aab01 -af4d-4256-97e9-4d5bb83aab01 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rolling Hills Electric Coop Effective date: 2010/07/01 End date if known: Rate name: Private Street and Area Lighting (PSL-10) metered MV 250W Sector: Lighting Description: http://rollinghills.coopwebbuilder.com/sites/rollinghills.coopwebbuilder.com/files/rate_tariffs.pdf Source or reference: http://rollinghills.coopwebbuilder.com/sites/rollinghills.coopwebbuilder.com/files/rate_tariffs.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

348

Data:069c5c98-552e-46af-8588-d1a6d19b6e90 | Open Energy Information  

Open Energy Info (EERE)

069c5c98-552e-46af-8588-d1a6d19b6e90 069c5c98-552e-46af-8588-d1a6d19b6e90 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sand Mountain Electric Coop Effective date: 2013/05/01 End date if known: Rate name: Schedule SMSD - Manufacturing Service Sector: Industrial Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

349

Data:2a460ec1-da39-4574-b9c5-103f1af603b7 | Open Energy Information  

Open Energy Info (EERE)

0ec1-da39-4574-b9c5-103f1af603b7 0ec1-da39-4574-b9c5-103f1af603b7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1996/05/02 End date if known: Rate name: Commercial Time of Use (Single-Phase), Schedule TOU-C Sector: Commercial Description: Business, industrial and non-residential service. Minimum Charge shall be the highest of: (a) Customer Charge of 10.00; or (b) As prescribed by the line extension policy of the rules and regulations of the Cooperative Subject to Power Cost Adjustment and Tax Adjustment Source or reference: Rates Binder B #4

350

Data:3310e7de-f4c4-4efe-8e5a-f0cb1ab95150 | Open Energy Information  

Open Energy Info (EERE)

de-f4c4-4efe-8e5a-f0cb1ab95150 de-f4c4-4efe-8e5a-f0cb1ab95150 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Russellville, Kentucky (Utility Company) Effective date: End date if known: Rate name: Commercial Class 40 Sector: Commercial Description: Source or reference: http://www.russepb.com/rates.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

351

Data:C93b7585-23dd-4007-af1b-f101d2624bb1 | Open Energy Information  

Open Energy Info (EERE)

85-23dd-4007-af1b-f101d2624bb1 85-23dd-4007-af1b-f101d2624bb1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- (250W SV on existing 35 ft. wood Pole- Overheard Wiring) Sector: Lighting Description: This rate schedule is available on an annual basis to any customer for illumination of outdoor areas. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

352

Data:Bcf25f00-7fce-4bb7-b23a-f9576993f97d | Open Energy Information  

Open Energy Info (EERE)

0-7fce-4bb7-b23a-f9576993f97d 0-7fce-4bb7-b23a-f9576993f97d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Street Lighting Service STL-8 (400W HPS) Sector: Lighting Description: Applicable to municipal or local governmental street lighting service by means of mercury vapor or high pressure sodium lamps. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent: Comments Applicability

353

Data:42f77724-394f-4af3-873a-ae25dd294a91 | Open Energy Information  

Open Energy Info (EERE)

7724-394f-4af3-873a-ae25dd294a91 7724-394f-4af3-873a-ae25dd294a91 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mt Wheeler Power, Inc Effective date: 2012/01/10 End date if known: Rate name: Irrigation Rate (Off-Peak Rate) Sector: Commercial Description: With Off-Peak Rate, irrigators can waive the monthly demand charge if they can schedule their irrigation times with the cooperative's designated off-peak time periods. This includes some afternoon hours part of the year, and nighttime hours all year. If any usage is recorded during on-peak time periods, the demand charge is also billed.

354

Data:59030ce0-1bb0-4287-bbc3-8540d2af911e | Open Energy Information  

Open Energy Info (EERE)

-1bb0-4287-bbc3-8540d2af911e -1bb0-4287-bbc3-8540d2af911e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: GreyStone Power Corporation Effective date: 2008/11/01 End date if known: Rate name: Ball Park Metered Outdoor Lighting Sector: Lighting Description: Source or reference: http://www.greystonepower.com/UploadedFiles/pdf/rate%2017.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

355

Data:E0a904e4-035e-472e-af3f-7ee0cd1d5ebd | Open Energy Information  

Open Energy Info (EERE)

4e4-035e-472e-af3f-7ee0cd1d5ebd 4e4-035e-472e-af3f-7ee0cd1d5ebd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Quakertown, Pennsylvania (Utility Company) Effective date: 2012/09/26 End date if known: Rate name: Industrial service rate (2) V2 Sector: Industrial Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

356

Data:Db758f51-b7a3-4bd4-adfb-4af27ab0ec42 | Open Energy Information  

Open Energy Info (EERE)

Db758f51-b7a3-4bd4-adfb-4af27ab0ec42 Db758f51-b7a3-4bd4-adfb-4af27ab0ec42 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pataula Electric Member Corp Effective date: 1997/12/01 End date if known: Rate name: Schedule MPS - Municipal Pumping Service Sector: Description: Applicable to all electric service for pumping and other uses incidental to the operation of a municipal water works or sewage disposal plant. Source or reference: http://facts.psc.state.ga.us/Public/GetDocument.aspx?ID=128532 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

357

Data:7b0e1af4-d59b-4700-9d74-39fc803f9b4d | Open Energy Information  

Open Energy Info (EERE)

e1af4-d59b-4700-9d74-39fc803f9b4d e1af4-d59b-4700-9d74-39fc803f9b4d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bangor Hydro-Electric Co Effective date: 2012/07/01 End date if known: Rate name: Municipal Incandescent-295 watts Sector: Lighting Description: Energy service only to municipalities owning, operating, and maintaining a street lighting system and limited to locations where secondary service is available. Traffic control lighting service may be rendered under this rate providing the customer furnishes the equipment. Customers taking service under this rate schedule are responsible for paying both Distribution Service and Stranded Cost.

358

Data:0133591f-42a3-40a2-bf96-af17cc68fd03 | Open Energy Information  

Open Energy Info (EERE)

91f-42a3-40a2-bf96-af17cc68fd03 91f-42a3-40a2-bf96-af17cc68fd03 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Lyndonville, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Street Lighting (250 W HP Sodium without Pole) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

359

Data:26766b49-a23f-4662-bb0f-af496e6ab65f | Open Energy Information  

Open Energy Info (EERE)

66b49-a23f-4662-bb0f-af496e6ab65f 66b49-a23f-4662-bb0f-af496e6ab65f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oregon Trail El Cons Coop, Inc Effective date: 2011/10/01 End date if known: Rate name: Municipal-Owned Lighting - Sodium Vapor 70W, Schedule ML Sector: Lighting Description: Available in OTEC service territory for OTEC-owned municipal and highway lighting installed on existing facilities, subject to policies as established by the Board of Directors. Source or reference: http://www.otecc.com/rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

360

Data:4c206ceb-b4af-4f22-bf8b-df0caebefaae | Open Energy Information  

Open Energy Info (EERE)

ceb-b4af-4f22-bf8b-df0caebefaae ceb-b4af-4f22-bf8b-df0caebefaae No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Paris, Tennessee (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: Outdoor Lighting- LS- Part B (400MV or Incandescent) Sector: Lighting Description: Applicable for outdoor lighting for individual customers. Source or reference: ISU Documentation Rate Binder Ted #11 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Data:99df3a59-78af-4da7-8083-753a727ac125 | Open Energy Information  

Open Energy Info (EERE)

78af-4da7-8083-753a727ac125 78af-4da7-8083-753a727ac125 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cleco Power LLC Effective date: 2011/02/01 End date if known: Rate name: Company-Owned Fixture - Floodlights 750 Watt HPS Sector: Lighting Description: Source or reference: www.cleco.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

362

Data:B5a349af-ccd1-4308-b8b3-613c9717c1d6 | Open Energy Information  

Open Energy Info (EERE)

9af-ccd1-4308-b8b3-613c9717c1d6 9af-ccd1-4308-b8b3-613c9717c1d6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mohave Electric Cooperative, Inc Effective date: 2012/09/01 End date if known: Rate name: Rate L Substation Rate Sector: Industrial Description: Available to commercial or industrial customers with demands exceeding 100 kW. A discount of 5% is applied to demand and energy charges for substation customers as defined as service taken directly from the low side bus of the distribution substation or where the customer requests multiple points of delivery. Source or reference: http://mohaveelectric.coopwebbuilder.com/content/rates

363

Data:56a0b8b5-d3f1-4281-8b9c-150b169af7d7 | Open Energy Information  

Open Energy Info (EERE)

b8b5-d3f1-4281-8b9c-150b169af7d7 b8b5-d3f1-4281-8b9c-150b169af7d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2012/12/19 End date if known: Rate name: RATE NO. 09 DUSK TO DAWN LIGHTING-High Pressure Sodium 250W Sector: Lighting Description: Applicability: To all customers for the purposes of outdoor lighting other than street and highway lighting service of privately owned property. Electric service is provided from dusk to dawn. ED3 will install, own, operate and maintain the complete lighting installation, including lamp replacements.

364

Data:Ea38227f-e85d-4631-9e5d-f40b1e4301af | Open Energy Information  

Open Energy Info (EERE)

227f-e85d-4631-9e5d-f40b1e4301af 227f-e85d-4631-9e5d-f40b1e4301af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Georgetown, Texas (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Municipal Water & Wastewater Pumping Sector: Commercial Description: *The Power Cost Adjustment is shown in the Flat rate adjustment field. Source or reference: http://billing.georgetown.org/rates/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

365

Data:C658e468-a7af-40c6-ae00-429e13ef346c | Open Energy Information  

Open Energy Info (EERE)

8e468-a7af-40c6-ae00-429e13ef346c 8e468-a7af-40c6-ae00-429e13ef346c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bonneville Power Admin Effective date: 2011/10/01 End date if known: 2013/09/30 Rate name: PF - 12 Exchange Sector: Residential Description: This schedule is available for the contract purchase of Firm Requirements Power pursuant to section 5(b) of the Northwest Power Act. Firm Requirements Power may be purchased for use within the Pacific Northwest by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start- Up, and Station Service.

366

Data:85b5084d-c5d9-4347-aa5e-2af17122e91d | Open Energy Information  

Open Energy Info (EERE)

84d-c5d9-4347-aa5e-2af17122e91d 84d-c5d9-4347-aa5e-2af17122e91d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Glasgow, Kentucky (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Outdoor Light- 250W High Pressure Sodium Sector: Lighting Description: Source or reference: http://www.glasgowepb.net/EPBrates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

367

Data:3cfa9a60-9648-4189-ab29-c401a52c9af4 | Open Energy Information  

Open Energy Info (EERE)

a60-9648-4189-ab29-c401a52c9af4 a60-9648-4189-ab29-c401a52c9af4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Belmont, Wisconsin (Utility Company) Effective date: 2005/01/21 End date if known: Rate name: Rg-1 Residential Service Three Phase Sector: Residential Description: This rate will be applied to residential single phase customers for ordinary household purposes. Single-Phase motors may not exceed 5 horsepower individual-rated capacity without utility permission. Fixed Monthly Charge includes Commitment to Community Rider: $1.00 per customer per month Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=440

368

Data:D2a0af69-9f80-45bc-943c-2011ecbce8cb | Open Energy Information  

Open Energy Info (EERE)

af69-9f80-45bc-943c-2011ecbce8cb af69-9f80-45bc-943c-2011ecbce8cb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Auburn Board of Public Works Effective date: 2012/01/01 End date if known: Rate name: Urban Electric Space Heating(Single Phase-Winter) Sector: Description: To customers within the corporate limits of the city of Auburn, NE as a rider to the General Service or Demand Service where only electric heating, cooling, and electric water heating, and associated equipment are connected as a separate service. Source or reference: http://auburnbpw.com/wp-content/files/2012_Electric_Rates.pdf

369

Data:304c7bdb-9ac5-4bea-ab51-af99e3f22ac3 | Open Energy Information  

Open Energy Info (EERE)

bdb-9ac5-4bea-ab51-af99e3f22ac3 bdb-9ac5-4bea-ab51-af99e3f22ac3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cuming County Public Pwr Dist Effective date: 2011/12/14 End date if known: Rate name: Security Lighting Unmetered Lights 400W MV Sector: Lighting Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

370

Data:6af307a9-ffe0-4158-8b87-8be392c2fe7d | Open Energy Information  

Open Energy Info (EERE)

af307a9-ffe0-4158-8b87-8be392c2fe7d af307a9-ffe0-4158-8b87-8be392c2fe7d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2012/03/02 End date if known: Rate name: Large General Service, Base Use at Primary Voltage Price Schedules LPN and APN Sector: Industrial Description: APPLICABLE: At the option of the customer, to all electric service required on premises by customer, subject to applicable terms and conditions of the Company's Electric Service Policies and Electric Rate Application. Applicable to standby or supplementary service (under written agreement only) in conjunction with applicable Company riders for such service.

371

Data:92b84ab0-66ab-46f2-a8af-fe33421c676e | Open Energy Information  

Open Energy Info (EERE)

4ab0-66ab-46f2-a8af-fe33421c676e 4ab0-66ab-46f2-a8af-fe33421c676e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bangor Hydro-Electric Co Effective date: 2012/07/01 End date if known: Rate name: Incandescent Lighting-405 watts Sector: Lighting Description: Service under this rate is available for street and area lighting service installations, maintenance and use of energy, and traffic control lighting service provided the customer furnishes the equipment. Customers taking service under this rate schedule are responsible for paying both Distribution Service and Stranded Cost. bundled TD&S monthly rate included

372

Data:Ccedef36-f73d-46af-87df-c8acc18c8a3b | Open Energy Information  

Open Energy Info (EERE)

Ccedef36-f73d-46af-87df-c8acc18c8a3b Ccedef36-f73d-46af-87df-c8acc18c8a3b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sand Mountain Electric Coop Effective date: 2013/05/01 End date if known: Rate name: Schedule GSB Sector: Commercial Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

373

Data:00ce79c7-0cf6-4814-af4b-c890e5586c1b | Open Energy Information  

Open Energy Info (EERE)

0cf6-4814-af4b-c890e5586c1b 0cf6-4814-af4b-c890e5586c1b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Moorhead, Minnesota (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Interruptible Curtailable Load Sector: Description: Available to General Service customers with a minimum of 100 kW of interruptible electrical load. Service under these rates requires conformance with MPS' Electric Service Rules and Regulations. Customers agree to manually curtail demand to a specified maximum demand level during the utility's curtailment period. General Service rate applies with credit for interruption as follows:

374

Data:Df8e1df8-1796-4d76-b03a-f654e0fcfae9 | Open Energy Information  

Open Energy Info (EERE)

e1df8-1796-4d76-b03a-f654e0fcfae9 e1df8-1796-4d76-b03a-f654e0fcfae9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Elec & Gas Co Effective date: 2010/06/07 End date if known: Rate name: 10000 lumens NEMA Head Sector: Lighting Description: Source or reference: http://www.pseg.com/family/pseandg/tariffs/electric/pdf/electric_tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

375

Data:Df2a155a-c13e-40af-894c-3badb82a245f | Open Energy Information  

Open Energy Info (EERE)

a155a-c13e-40af-894c-3badb82a245f a155a-c13e-40af-894c-3badb82a245f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Yellowstone R E A, Inc Effective date: 2008/11/01 End date if known: Rate name: Net Metering Rate Schedule - Base #3 Sector: Commercial Description: Includes 320A or greater services with over 5 kW of generating capacity. Source or reference: Illinois State University Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

376

Data:B3277137-3d4e-4db0-8348-6d2c1af48efb | Open Energy Information  

Open Energy Info (EERE)

7-3d4e-4db0-8348-6d2c1af48efb 7-3d4e-4db0-8348-6d2c1af48efb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2000/11/01 End date if known: Rate name: AREA LIGHTING 100 watt high pressure sodium Sector: Lighting Description: Available to all customers for dusk to dawn outdoor area lighting not served under street lighting contract. Service under this schedule is also available for television amplifiers for cable systems, and other flat rate services. Special light poles $1.00 per month Source or reference: http://www.tpud.org/servicesAndBilling/rateSchedules.aspx

377

Data:E6ef5af2-eba1-4f6a-9ba2-3492960faa16 | Open Energy Information  

Open Energy Info (EERE)

ef5af2-eba1-4f6a-9ba2-3492960faa16 ef5af2-eba1-4f6a-9ba2-3492960faa16 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gastonia, North Carolina (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: SCHEDULE CS - Small Commercial Service Sector: Commercial Description: Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

378

Data:37f3d550-fae7-47f6-8e01-1580af1228f3 | Open Energy Information  

Open Energy Info (EERE)

d550-fae7-47f6-8e01-1580af1228f3 d550-fae7-47f6-8e01-1580af1228f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwestern Electric Power Co (Louisiana) Effective date: 2013/03/01 End date if known: Rate name: Municipal Street and Parkway Lighting - Closed offering - 400 Watt MV Energy Only Sector: Lighting Description: Source or reference: http://www.swepco.com/global/utilities/lib/docs/ratesandtariffs/Louisiana/LouisianaA_06_06_2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

379

Data:C10c0c69-1af0-4fd0-b3cf-45093932f0a0 | Open Energy Information  

Open Energy Info (EERE)

c0c69-1af0-4fd0-b3cf-45093932f0a0 c0c69-1af0-4fd0-b3cf-45093932f0a0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Coop Effective date: 2009/01/01 End date if known: Rate name: Rate Schedule LM-C (Load Management Credits)(Controlled water heater) Sector: Commercial Description: Available to cooperative members with one or more electric water heaters and/or central air conditioners except for limitations listed in the Billing Provisions below. $8.00 credit per month per controlled water heater (12 months per year) (LMCWH)- Minimum monthly usage of 400 kilowatt-hours (kwh) is required.

380

Data:6cdf94d5-d609-4140-af6a-fd3cb32bce38 | Open Energy Information  

Open Energy Info (EERE)

cdf94d5-d609-4140-af6a-fd3cb32bce38 cdf94d5-d609-4140-af6a-fd3cb32bce38 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Harmon Electric Assn Inc Effective date: 2008/10/01 End date if known: Rate name: 100 Watt HPS Sector: Lighting Description: * Available to all customers for illumination of outdoor areas at any point on or near the Association's distribution lines. The cost of purchased power adjustment will be computed using 70kWh per light per month. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Data:3dc51ed5-91c8-464f-b50e-8af7ff5ccb32 | Open Energy Information  

Open Energy Info (EERE)

ed5-91c8-464f-b50e-8af7ff5ccb32 ed5-91c8-464f-b50e-8af7ff5ccb32 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Thomaston, Georgia (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Industrial Service Sector: Industrial Description: Applicable to all electric service of one standard voltage required on the customer's premises,delivered at one point and metered at or compensated to that voltage for any customer who meets the following criteria: 1.An existing customer must have been served under schedule I-1 or schedule LMSS-1, prior to taking service under this schedule I-2.

382

Data:998a6b93-6a40-4406-b626-f3af149dc8fb | Open Energy Information  

Open Energy Info (EERE)

b93-6a40-4406-b626-f3af149dc8fb b93-6a40-4406-b626-f3af149dc8fb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Monroe County Elec Coop, Inc Effective date: 2013/04/01 End date if known: Rate name: Schedule B- Rate 0003 (Single-Phase) Sector: Commercial Description: This rate is available to members for commercial, industrial and three-phase farm service for all uses, including lighting, heating etc.., subject to established rules of the cooperative. Source or reference: http://www.mcec.org/Documents/2013%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

383

Data:E1893b3c-247a-4e20-b22b-af34a3146b3f | Open Energy Information  

Open Energy Info (EERE)

b3c-247a-4e20-b22b-af34a3146b3f b3c-247a-4e20-b22b-af34a3146b3f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Black Warrior Elec Member Corp Effective date: 2013/09/01 End date if known: Rate name: City Limits- Residential Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

384

Data:A916e60f-11af-4286-b55b-996c6b56a39b | Open Energy Information  

Open Energy Info (EERE)

6e60f-11af-4286-b55b-996c6b56a39b 6e60f-11af-4286-b55b-996c6b56a39b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Ottawa, Kansas (Utility Company) Effective date: 2010/05/01 End date if known: Rate name: RU Sector: Residential Description: To all residential consumer, including rooming houses, with two or fewer units available for rent, apartment building and trailer courts, for customary domestic uses. To any combination residential and business consumer otherwise complying with residential zoning restrictins, where rendering of services and production or handing of goods is incidental to domestic uses, and none other than the resident is employed thereat.

385

Data:B186150c-7120-4086-af95-2a1f95d75ada | Open Energy Information  

Open Energy Info (EERE)

0c-7120-4086-af95-2a1f95d75ada 0c-7120-4086-af95-2a1f95d75ada No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Omaha Public Power District Effective date: 2013/01/01 End date if known: Rate name: CONSUMER OWNED STREET LIGHTING Mercury Vapor 1000 Sector: Lighting Description: CONSUMER OWNED SYSTEM OPERATED BY DISTRICT Source or reference: http://ww3.oppd.com/rates/OppdRateManual.pdf#nameddest=110 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

386

Data:7a3bfb7d-7c13-4271-bcb6-af5197c36f02 | Open Energy Information  

Open Energy Info (EERE)

d-7c13-4271-bcb6-af5197c36f02 d-7c13-4271-bcb6-af5197c36f02 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stanton County Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Municipal Large Commercial Three Phase Sector: Commercial Description: Source or reference: ISU Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

387

Data:6580e423-aca4-41ca-af7f-d50664e0d12d | Open Energy Information  

Open Energy Info (EERE)

e423-aca4-41ca-af7f-d50664e0d12d e423-aca4-41ca-af7f-d50664e0d12d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sacramento Municipal Utility District Effective date: 2012/01/01 End date if known: Rate name: TC ILS - Intersection lighting service Sector: Lighting Description: Source or reference: https://www.smud.org/en/business/customer-service/rates-requirements-interconnection/documents/1-TC%20ILS.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

388

Data:3749a7af-207e-4d6b-a576-91e778643d03 | Open Energy Information  

Open Energy Info (EERE)

af-207e-4d6b-a576-91e778643d03 af-207e-4d6b-a576-91e778643d03 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Howard Greeley Rural P P D Effective date: End date if known: Rate name: Municipal Pumping Service Sector: Commercial Description: Source or reference: Illinois State University Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

389

Data:6163a421-af48-4b99-a054-fd48e23f3831 | Open Energy Information  

Open Energy Info (EERE)

-af48-4b99-a054-fd48e23f3831 -af48-4b99-a054-fd48e23f3831 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nolin Rural Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Schedule 1 - Residential, Farm, non-farm, trailers and mobile homes Sector: Residential Description: Source or reference: www.nolinrecc.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3

390

Data:18e26cbf-e04a-470e-8e47-bf0af1293710 | Open Energy Information  

Open Energy Info (EERE)

cbf-e04a-470e-8e47-bf0af1293710 cbf-e04a-470e-8e47-bf0af1293710 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2012/11/01 End date if known: Rate name: RS-TOU FP (Bundled) Sector: Residential Description: Available for full domestic service to individually metered residential customers, including rural domestic customers, engaged principally in agricultural pursuits. This is the bundled service. Source or reference: http://www.atlanticcityelectric.com/_res/documents/NJTariffSectionIV.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

391

Data:0d999486-b06b-4af0-8fa9-5e7829e1fbef | Open Energy Information  

Open Energy Info (EERE)

9486-b06b-4af0-8fa9-5e7829e1fbef 9486-b06b-4af0-8fa9-5e7829e1fbef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bandon, Oregon (Utility Company) Effective date: End date if known: Rate name: Public Authority Small Commercial Three Phase- Outside City Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

392

Data:0bd2bb4a-f55f-4d57-a5e2-8cdebd2a138f | Open Energy Information  

Open Energy Info (EERE)

a-f55f-4d57-a5e2-8cdebd2a138f a-f55f-4d57-a5e2-8cdebd2a138f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Baudette, Minnesota (Utility Company) Effective date: 2011/04/20 End date if known: Rate name: Rate 9 Generation Sector: Description: Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Fixed monthly charge is per month, per transformer. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

393

Data:209d7efd-f9f6-4c93-a261-7922668af118 | Open Energy Information  

Open Energy Info (EERE)

efd-f9f6-4c93-a261-7922668af118 efd-f9f6-4c93-a261-7922668af118 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lebanon, Indiana (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: SL - Public Street Lighting 100 watt sodium vapor Sector: Lighting Description: Availability Available for any standard overhead Public Street Lighting Service. Character of Service Public Street Lighting Service using lamps available under this schedule. Source or reference: http://www.lebanon-utilities.com/e_rates.html Source Parent: Comments Applicability Demand (kW) Minimum (kW):

394

Data:6aaf3bd3-a593-4012-9a64-d50af6aae37b | Open Energy Information  

Open Energy Info (EERE)

aaf3bd3-a593-4012-9a64-d50af6aae37b aaf3bd3-a593-4012-9a64-d50af6aae37b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2008/04/15 End date if known: Rate name: 41 BP-AE-4 Bulk Power All Electric Sector: Description: Available to Consumers requiring a transformer capacity of 5000 kVA or more, subject to Association's established rules and regulations. This Bulk Power Service Rate applies to electric service measured by one meter used exclusively by one Consumer in a single establishment on one premise utilizing a single delivery point, and not resold or shared with others.

395

Data:B9f7af72-b0e4-4f57-8bbe-37bb03955fd6 | Open Energy Information  

Open Energy Info (EERE)

af72-b0e4-4f57-8bbe-37bb03955fd6 af72-b0e4-4f57-8bbe-37bb03955fd6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coast Electric Power Assn Effective date: 2011/04/01 End date if known: Rate name: Light Service HPS 150 W - Town/Country Sector: Lighting Description: *Fixed monthly charge is the sum of fixture charge, energy charge, and pole charge. Adjustment includes power cost adjustment rider and tax expense adjustment rider Source or reference: http://www.coastepa.com/documents/Rate7H.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

396

Data:C3fdc9fa-9f0c-4a40-af1e-ac992cd70561 | Open Energy Information  

Open Energy Info (EERE)

fdc9fa-9f0c-4a40-af1e-ac992cd70561 fdc9fa-9f0c-4a40-af1e-ac992cd70561 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clinton County Elec Coop, Inc Effective date: 2013/02/01 End date if known: Rate name: Schedule 20 - ELECTRIC SPACE HEATING Sector: Residential Description: Available to all members of the Cooperative for residential and commercial space conditioning service, during the twelve calendar months of the year. Source or reference: www.cceci.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

397

Data:C47a3e76-0ad6-483b-b989-4550013285af | Open Energy Information  

Open Energy Info (EERE)

6-0ad6-483b-b989-4550013285af 6-0ad6-483b-b989-4550013285af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: One light 175 Watt MVL Sector: Lighting Description: - Available to all consumers located on or adjacent to cooperative's single-phase or three-phase lines. - Subject to power cost adjustment,tax adjustment and rate revisions. - Monthly rate depend on light within 150ft. proximity. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

398

Data:20842e60-5a52-4e43-af71-081dd80c1e6d | Open Energy Information  

Open Energy Info (EERE)

e60-5a52-4e43-af71-081dd80c1e6d e60-5a52-4e43-af71-081dd80c1e6d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Fairfield Electric Coop, Inc Effective date: 2008/12/01 End date if known: Rate name: Construction Service Sector: Commercial Description: * Applicable to temporary service for builders for lighting and power for a construction site using a single point of delivery. Subject to power cost adjustment and tax adjustment. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

399

Data:2ef4eff0-96bb-43af-b5c3-a303617272ab | Open Energy Information  

Open Energy Info (EERE)

eff0-96bb-43af-b5c3-a303617272ab eff0-96bb-43af-b5c3-a303617272ab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lighthouse Electric Coop, Inc Effective date: 2010/06/01 End date if known: Rate name: Large Power Service Sector: Industrial Description: Applicable to all customers having 51 KVa or more of installed transformer capacity taking the type of service described in this rate schedule for all of the electric service supplied at on point of delivery and measured through one meter used for all purposes subject to the established rules and regulations of the Cooperative. Source or reference: Rate Binder 5, Illinois State University

400

Data:D19c53df-3351-4b2d-a96b-cbe3ce02af56 | Open Energy Information  

Open Energy Info (EERE)

df-3351-4b2d-a96b-cbe3ce02af56 df-3351-4b2d-a96b-cbe3ce02af56 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New Hampshire Elec Coop Inc Effective date: 2013/05/01 End date if known: Rate name: Ski Area Contract (1000 KVA)SKI Sector: Commercial Description: The Coop Power rate will be NHEC's cost for procuring energy service and other NEPOOL Products applicable for the member's hourly load, adjusted to retail for losses and for NHEC administrative costs. Source or reference: http://www.nhec.com/filerepository/rate_change_sheets_for_2013_may01_final.pdf Source Parent:

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Data:7abb6335-af9f-4c46-b6f4-0d5b1f807dc9 | Open Energy Information  

Open Energy Info (EERE)

abb6335-af9f-4c46-b6f4-0d5b1f807dc9 abb6335-af9f-4c46-b6f4-0d5b1f807dc9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: RS - Schedule A-1 - City of Lakewood - collectively metered apartments Sector: Residential Description: Available for domestic purposes in residences, apartments, duplex houses and multiple family dwellings. Source or reference: www.mytpu.org/customer-service/rates/power-rates/power-rates-schedules.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

402

Data:280ad7fd-8af8-47ec-a275-34fdc7f7217a | Open Energy Information  

Open Energy Info (EERE)

ad7fd-8af8-47ec-a275-34fdc7f7217a ad7fd-8af8-47ec-a275-34fdc7f7217a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Florida Power & Light Co. Effective date: 2013/07/01 End date if known: Rate name: OL-1 - Outdoor Lighting - Sodium Vapor 150/12000Lumens Watt Relamping - Customer Owned Sector: Lighting Description: Source or reference: www.fpl.com/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

403

Data:08fb31c8-8850-49b0-9174-3b194f1083af | Open Energy Information  

Open Energy Info (EERE)

fb31c8-8850-49b0-9174-3b194f1083af fb31c8-8850-49b0-9174-3b194f1083af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Flathead Electric Coop Inc Effective date: 2010/05/01 End date if known: Rate name: Recreation Field Lighting Service Sector: Lighting Description: Source or reference: http://www.flatheadelectric.com/rates/FLS01.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

404

Data:72f3a5f6-f7af-4b34-8539-aebcd13d3e67 | Open Energy Information  

Open Energy Info (EERE)

f6-f7af-4b34-8539-aebcd13d3e67 f6-f7af-4b34-8539-aebcd13d3e67 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2011/01/01 End date if known: Rate name: RATE NO. 11 STREET LIGHTING-Single Fixture Light 50000 HPS Sector: Lighting Description: Applicability: To all customers for the purpose of outdoor lighting of streets alleys, thoroughfares, public parks and playgrounds. Service is dusk to dawn and District will own, operate and maintain the street lighting system including lamps and glass replacement. Monthly Usage: 400kWh Source or reference: http://www.ed3online.org/view/70

405

Data:106c6ec3-d129-4dfd-877a-f0d97c6f1bd4 | Open Energy Information  

Open Energy Info (EERE)

c6ec3-d129-4dfd-877a-f0d97c6f1bd4 c6ec3-d129-4dfd-877a-f0d97c6f1bd4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sun River Electric Coop, Inc Effective date: 2012/01/01 End date if known: Rate name: Security Lighting - 100 watt HPS - Existing Pole Sector: Lighting Description: * Single phase at available voltage. Available for automatic dusk-to-dawn lighting when cooperative furnishes all material, maintenance and electric energy. Source or reference: http://www.sunriverelectric.coop/Membership/Billing_Rates_and_Fees/Security_Lighting/index.html Source Parent: Comments Applicability Demand (kW)

406

Data:08da069a-c1af-4e4f-9970-ea8510f75c48 | Open Energy Information  

Open Energy Info (EERE)

c1af-4e4f-9970-ea8510f75c48 c1af-4e4f-9970-ea8510f75c48 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2012/08/01 End date if known: Rate name: 70 OL-8 400 HPS Sector: Lighting Description: Available to all Consumer's subject to Association's established rules and regulations. Association's standard outdoor lighting facilities. Service includes Association furnishing, operating, and maintaining lighting fixture, control equipment and lamp. When Association is required to alter its normal facilities to furnish a special outdoor lighting service, there will be an additional monthly charge.

407

Data:F0b86ab4-f269-4ff9-b7af-380214768e35 | Open Energy Information  

Open Energy Info (EERE)

b86ab4-f269-4ff9-b7af-380214768e35 b86ab4-f269-4ff9-b7af-380214768e35 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: RESIDENTIAL SERVICE WITH ALL ELECTRIC HOUSE HEATING Sector: Residential Description: Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

408

Data:1ed235b7-663f-4c2a-af80-95bfe26b2091 | Open Energy Information  

Open Energy Info (EERE)

ed235b7-663f-4c2a-af80-95bfe26b2091 ed235b7-663f-4c2a-af80-95bfe26b2091 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Woodruff Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Optional Residential Controlled Air Conditioning Service Sector: Description: Applicable to any customer who has a central air conditioning system with a connected compressor load of 3 kVA or more and agreeing to permit the Cooperative to install a control device is that the Cooperative can control the operation of the air conditioning compressor during periods of the Cooperative's peak load conditions and during emergency conditions.

409

Data:013319c0-4652-4e81-af0b-98dc9628c4aa | Open Energy Information  

Open Energy Info (EERE)

-4652-4e81-af0b-98dc9628c4aa -4652-4e81-af0b-98dc9628c4aa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tecumseh, Nebraska (Utility Company) Effective date: 2013/05/01 End date if known: 2013/09/30 Rate name: Municipal General Service- Single Phase Sector: Commercial Description: Applicable to any customer that is City property tax supported, and such billings are paid from the City of Tecumseh's general fund for lighting, heating and power. Demand can not exceed 60 kW for 2 consecutive months. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW)

410

Data:7be77054-a962-44b5-be23-59be27af310d | Open Energy Information  

Open Energy Info (EERE)

7054-a962-44b5-be23-59be27af310d 7054-a962-44b5-be23-59be27af310d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City Utilities of Springfield Effective date: 2011/10/01 End date if known: Rate name: Private Outdoor Lighting 150 watt Security Light Sector: Lighting Description: Service under this rate shall be available within the corporate limits of the City of Springfield, Missouri, and the adjacent territory served by City Utilities for residential, commercial, and industrial private outdoor lighting. Availability is subject to the General Terms and Conditions Governing Electric Service and the Utility Service Rules and Regulations.

411

Data:15d2b593-c15f-4329-be00-0b0664107af6 | Open Energy Information  

Open Energy Info (EERE)

b593-c15f-4329-be00-0b0664107af6 b593-c15f-4329-be00-0b0664107af6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Broad River Electric Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Pre-Paid Residential Service Three-Phase Sector: Residential Description: * Available to members who complete an agreement pursuant to the Cooperative's Pre-Paid Meter Program. It is 120/240 volts. Subject to wholesale power cost adjustment and sales tax. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

412

Data:B537085d-40a6-464a-af0c-154db1a55be7 | Open Energy Information  

Open Energy Info (EERE)

d-40a6-464a-af0c-154db1a55be7 d-40a6-464a-af0c-154db1a55be7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stanhope, Iowa (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Commercial Rate #5 (Single Phase) Tiered Rate Sector: Commercial Description: there are two rates, composite and Tiered. Source or reference: See IRPS Binder "A" Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

413

Data:09a33892-2e84-4931-aa2a-f67b405d5aef | Open Energy Information  

Open Energy Info (EERE)

892-2e84-4931-aa2a-f67b405d5aef 892-2e84-4931-aa2a-f67b405d5aef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mt Wheeler Power, Inc Effective date: 2012/01/10 End date if known: Rate name: Irrigation Rate (Demand Charge) Sector: Commercial Description: Demand Rate is the standard rate for most irrigation consumers. It is billed based on an energy charge for the total number of kilowatt hours during the month, a demand charge based on the highest recorded kilowatt demand, and an annual horsepower charge rather than a monthly customer charge. Source or reference: http://www.mwpower.net/content/member-services-rates

414

Data:Ab279419-79a1-4410-af5b-0c56114c33ea | Open Energy Information  

Open Energy Info (EERE)

9419-79a1-4410-af5b-0c56114c33ea 9419-79a1-4410-af5b-0c56114c33ea No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sumter Electric Member Corp Effective date: 2012/01/01 End date if known: Rate name: Outdoor Lighting Underground MH Acorn 175 W w/ Aid Sector: Lighting Description: * Fixed Monthly Charge does not include monthly pole rate charges Source or reference: http://www.sumteremc.com/pdfs/OL-9.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

415

Data:7b64a4da-0bf0-42cc-a127-e98af1315dbc | Open Energy Information  

Open Energy Info (EERE)

da-0bf0-42cc-a127-e98af1315dbc da-0bf0-42cc-a127-e98af1315dbc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Three Notch Elec Member Corp Effective date: 2012/03/01 End date if known: Rate name: 100W Overhead Wiring (Non Mercury vapor fixtures) - (Type - 'HPS-Open',Wood Pole (1)) Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for installation and maintenance.

416

Data:451ab537-537a-4e55-993a-f12c8745f2cb | Open Energy Information  

Open Energy Info (EERE)

ab537-537a-4e55-993a-f12c8745f2cb ab537-537a-4e55-993a-f12c8745f2cb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Monroe County Elec Coop, Inc Effective date: 2013/04/01 End date if known: Rate name: Security Lights(Entrance Light(Nollau Nurseries) Sector: Commercial Description: Unmetered automatic Mercury Vapor Lighting and High Pressure Lighting, shall be available to consumers of the cooperative at the following rates and conditions. Source or reference: http://www.mcec.org/Documents/2013%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

417

Data:032453b9-4660-4139-8c2b-af846a49c0a5 | Open Energy Information  

Open Energy Info (EERE)

660-4139-8c2b-af846a49c0a5 660-4139-8c2b-af846a49c0a5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Carolina Pub Serv Auth Effective date: 2012/12/01 End date if known: Rate name: GT-12(General Service Time-Of-Use) Sector: Commercial Description: Applicability: This Schedule is applicable to all commercial customers of the Authority meeting the eligibility requirements of the Authority's Medium General Service Schedule, or its successor. Service hereunder applies to all service of the same voltage and character supplied to the Customer's premises through a single delivery point. Energy and power taken under this Schedule may not be resold or shared with others.

418

Data:De1e65ca-680d-46c1-985d-92af0848a44a | Open Energy Information  

Open Energy Info (EERE)

ca-680d-46c1-985d-92af0848a44a ca-680d-46c1-985d-92af0848a44a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stilwell, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lights - 175 Watt (existing pole Sector: Lighting Description: Source or reference: www.cityofstilwell.com/uploads/Ordinance_297__Water__Sewer__Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

419

Data:E560cffa-af0c-43b4-96a8-fc26f59ca0f4 | Open Energy Information  

Open Energy Info (EERE)

cffa-af0c-43b4-96a8-fc26f59ca0f4 cffa-af0c-43b4-96a8-fc26f59ca0f4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Platte-Clay Electric Coop, Inc Effective date: 2013/01/01 End date if known: Rate name: SL - 250 watt HPS Yard Light Sector: Lighting Description: Available for lighting streets, walkways, or outdoor lighting of public or private areas when such facilities are operated and maintained as an extension of the Cooperative's distribution system. Electric usage will be unmetered. Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments Applicability Demand (kW)

420

Data:Eba222af-34f3-4be9-b56c-0232f6ac19fd | Open Energy Information  

Open Energy Info (EERE)

af-34f3-4be9-b56c-0232f6ac19fd af-34f3-4be9-b56c-0232f6ac19fd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Calhoun, Georgia (Utility Company) Effective date: 2006/07/01 End date if known: Rate name: Medium Power Service- Industrial Sector: Industrial Description: This rate is applicable to all commercial or industrial electric service which is delivered or compensated to one standard voltage . Source or reference: Rate Binder # 2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Ecological Restoration Under Section 316(b) of the Clean Water Act: Issues in Implementation: Presentation at the AFS-EPRI 2004 Symp osium  

Science Conference Proceedings (OSTI)

This compact disc (CD) contains presentations made at the EPRI sponsored symposium "Ecological Restoration Under 316(b) of the Clean Water Act: Issues in Implementation" held in association with the annual meeting of the American Fisheries Society (AFS), Madison, WI, August 22-25, 2004. The CD extends the technical information presented in the 2003 EPRI report (1007454) "Enhancement Strategies for Mitigating Potential Operational Impacts of Cooling Water Intake Structures: Approaches for Enhancing ...

2004-12-01T23:59:59.000Z

422

Data:99623403-8ce8-483f-82af-ef5cae66b9e8 | Open Energy Information  

Open Energy Info (EERE)

3-8ce8-483f-82af-ef5cae66b9e8 3-8ce8-483f-82af-ef5cae66b9e8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Seattle, Washington (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Schedule MDC - Medium Standard General Service: City Sector: Commercial Description: SCHEDULE MDC is for standard general service provided to city customers whose maximum demand is equal to or greater than 50 kW but less than 1,000 kW. Discounts: Transformer losses in kWh - 1756 + .53285 x kW + .00002 x kW2+ .00527 x kWh Estimated monthly Service Charge - $.73/day * 30 Days = $21.90

423

Data:Dec63f4d-d620-4acd-aadf-0af6f0b498d6 | Open Energy Information  

Open Energy Info (EERE)

Dec63f4d-d620-4acd-aadf-0af6f0b498d6 Dec63f4d-d620-4acd-aadf-0af6f0b498d6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Williams - AZ, Arizona (Utility Company) Effective date: End date if known: Rate name: Dusk to Dawn Lighting Service(100 W HPS) architectural Sector: Lighting Description: Where city installs, owns, and operates and maintains lighting facilities. Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

424

Data:09a265df-5af5-4d19-9f18-201ac4f73db9 | Open Energy Information  

Open Energy Info (EERE)

df-5af5-4d19-9f18-201ac4f73db9 df-5af5-4d19-9f18-201ac4f73db9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 1,000kW Demand Primary Metering Discount with Parallel Generation(20 kW or less)-Net Energy Billing Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0509 per kilowatt-hour.

425

Data:108af62d-4b57-4a2d-804b-adbdf3f9a98e | Open Energy Information  

Open Energy Info (EERE)

af62d-4b57-4a2d-804b-adbdf3f9a98e af62d-4b57-4a2d-804b-adbdf3f9a98e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Primary Metering and Transformer Ownership Discount (above 15,000 volts) with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

426

Data:5a6ca7e2-8494-4214-987a-f9e68593e313 | Open Energy Information  

Open Energy Info (EERE)

e2-8494-4214-987a-f9e68593e313 e2-8494-4214-987a-f9e68593e313 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Texas-New Mexico Power Co Effective date: 2009/09/01 End date if known: Rate name: Roadway Lighting Service - (overhead service), Schedule II -Ornamental Pole - two lamps per pole - 400W, MV (Closed) Sector: Lighting Description: The service provided pursuant to this Tariff is for any end-use customer for roadway lighting service where existing facilities have adequate capacity and suitable voltage. Unmetered, automatically controlled, overhead lighting service operating from dusk to dawn. The Company will install, operate and maintain such lighting. Lights will be mounted on an existing service pole or poles and such service will be limited to 120 volt service.

427

Data:Ec368b45-b015-48cc-9e20-7f9909c4af34 | Open Energy Information  

Open Energy Info (EERE)

68b45-b015-48cc-9e20-7f9909c4af34 68b45-b015-48cc-9e20-7f9909c4af34 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Membership Corporation Effective date: 2009/07/01 End date if known: Rate name: Residential All Electric Service Single Phase, Prepay Sector: Residential Description: Availability - This schedule is available for residential use and for use incidental thereto on a permanent year-around basis, supplied through one kilowatt-hour meter to each individual residence or apartment unit for consumers who have electric space heating equipment. The entire residential area must be heated exclusively by electricity except for the use of wood burning stoves, supplemental solar heat or the occasional use of an open fireplace. All power for cooking, water heating, clothes drying, and incidental use with the above exceptions, must be supplied by electricity. The capacity of individual motors served under this schedule shall not exceed 10 HP. Service under this schedule is subject to the Cooperative's established Service Rules and Regulations.

428

Data:91805cf2-4198-4fd5-a693-8bd6af94fa69 | Open Energy Information  

Open Energy Info (EERE)

5cf2-4198-4fd5-a693-8bd6af94fa69 5cf2-4198-4fd5-a693-8bd6af94fa69 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule NM Flat Rate Service-0 - 200 watts(Winter) Sector: Commercial Description: Applicability Applicable to small, constant, non-metered incidental loads for utilities, state agencies, and applicable special districts where the customer owns and maintains the equipment. Such loads would include:  Cathodic Protection Stations  Motor Radial Gates  Pressure Point Automatic Watering Systems  Traffic Counters  Flashing Beacons  Sign Illumination Winter(Dec-May): $ 10.04 per month Summer(Jun-Nov): $ 13.06 per month

429

Data:B9af95f2-c5ce-465c-b5a7-b90811ac84e1 | Open Energy Information  

Open Energy Info (EERE)

af95f2-c5ce-465c-b5a7-b90811ac84e1 af95f2-c5ce-465c-b5a7-b90811ac84e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Primary Service - Non-IDR Metered, 400-2000 kVa (TC-LGS) Sector: Commercial Description: Delivery Service will be single or three-phase, 60 hertz, at a standard primary voltage. Delivery Service will be metered using Company's standard Meter provided for this type of Delivery Service. Any Meter other than the standard Meter will be provided at an additional charge and/or will be provided by a Meter Owner other than the Company pursuant to Applicable Legal Authorities. Where Delivery Service of the type desired is not available at the Point of Delivery, additional charges and special contract arrangements may be required prior to Delivery Service being furnished, pursuant to Section 6.1.2.2, Construction Services, of this Tariff.

430

Data:Df0db423-af24-49ec-9719-7449c2818b91 | Open Energy Information  

Open Energy Info (EERE)

db423-af24-49ec-9719-7449c2818b91 db423-af24-49ec-9719-7449c2818b91 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Hastings, Nebraska (Utility Company) Effective date: End date if known: Rate name: Street Light Rates Sector: Lighting Description: (B + or - C + D)/(A = 12 x N) where, A = Monthly charge expressed as $ per month. This charge shall be reviewed for reasonableness and appropriate cost recovery annually and shall apply to bills rendered for the 12 months beginning each January 1. B = The total budget of the Street Lighting Department approved by City Council for the next fiscal year expressed as $. Such budget shall include all estimated expenditures for Operating Expenditures and Capital Improvements. Operating Expenditures shall include: Operation and Maintenance, Delivered Power Cost, Outside Services, and Administrative Charges.

431

Data:6a47cc57-32ab-4f3c-a90e-4c24af57d602 | Open Energy Information  

Open Energy Info (EERE)

cc57-32ab-4f3c-a90e-4c24af57d602 cc57-32ab-4f3c-a90e-4c24af57d602 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of St Marys, Ohio (Utility Company) Effective date: 2001/06/10 End date if known: Rate name: Commercial General Service Transmission Rate-Metering Discount Sector: Commercial Description: *This rate is available for lighting and power for those customers establishing a minimum of 3,000 KW demand. character of service:Standard transmission service voltages as provided in rules and regulations, Alternating Current 60 Hertz (cycles per second). minimum monthly charge:The minimum monthly charge will be based upon a billing demand of no less than 3,000 KW demand.

432

Data:8c43f069-bcc9-447a-90af-4a6e7db5d8e7 | Open Energy Information  

Open Energy Info (EERE)

3f069-bcc9-447a-90af-4a6e7db5d8e7 3f069-bcc9-447a-90af-4a6e7db5d8e7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NH Effective date: 2012/01/01 End date if known: Rate name: 330 FLUORESCENT Sector: Commercial Description: Source or reference: http://www.nu.com/PSNHTariffPDFs/tariff070107.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

433

Data:93192050-d4e7-4e64-9af1-abfb54306b65 | Open Energy Information  

Open Energy Info (EERE)

050-d4e7-4e64-9af1-abfb54306b65 050-d4e7-4e64-9af1-abfb54306b65 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2012/06/01 End date if known: Rate name: Outdoor Lighting Cobrahead/Ornamental MH 100 W Sector: Lighting Description: *Wood Poles a. Prior to construction, the requesting party will be required to pay a one-time, non-refundable, contribution-in-aid of construction (CIAC) as outlined below; i. $600 per 30 foot wood pole, ii. $625 per 35 foot wood pole, Standard Ornamental Fixtures and Standard Ornamental Poles a. Prior to construction, the requesting party will be required to pay a one-time, non-refundable, contribution-in-aid of construction (CIAC) as outlined below; i. $ 525 per 22 foot fiberglass pole; ii. $1,450 per 35 foot fiberglass pole;

434

Data:Cc39eb93-15cc-458d-8af5-6de61974e887 | Open Energy Information  

Open Energy Info (EERE)

3-15cc-458d-8af5-6de61974e887 3-15cc-458d-8af5-6de61974e887 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Menasha, Wisconsin (Utility Company) Effective date: 2011/04/06 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: This rate is optional to Cp-1, Small Power Service customers if their consumption exceeds 40,000 kWh and their monthly Maximum Measured Demand is in excess of 50 kilowatts (kW) per month for three or more months in a consecutive 12-month period, unless the customer exceeds the application conditions of the large power time-of-day schedule.

435

Data:6575e16d-6e7a-4c0f-8ac9-c72af72a6dfa | Open Energy Information  

Open Energy Info (EERE)

5e16d-6e7a-4c0f-8ac9-c72af72a6dfa 5e16d-6e7a-4c0f-8ac9-c72af72a6dfa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hart Electric Member Corp Effective date: End date if known: Rate name: Schedule CS-1,2,3 Contract School Service Sector: Description: AVAILABILITY Available in all territory served by the Corporation, in accordance with the established Service Rules and Regulations of the Corporation and subject to the execution of a written agreement for electric between the Corporation and the consumer. TYPE OF SERVICE Service shall be provided as set forth in the agreement for electric service between the Corporation and the consumer.

436

Data:60792c42-af01-4f0c-b32b-b4fae356f0db | Open Energy Information  

Open Energy Info (EERE)

c42-af01-4f0c-b32b-b4fae356f0db c42-af01-4f0c-b32b-b4fae356f0db No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 1,000kW Demand Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0765 per kilowatt-hour.

437

Data:F467c8b9-f8d7-4697-af91-47ebd8f0ed09 | Open Energy Information  

Open Energy Info (EERE)

c8b9-f8d7-4697-af91-47ebd8f0ed09 c8b9-f8d7-4697-af91-47ebd8f0ed09 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shenandoah Valley Elec Coop Effective date: End date if known: Rate name: SALES AND USE TAX SURCHARGE-Q Sector: Description: APPLICABLE TO SCHEDULES "RQ", "CQ", "GQ", "PHQ", "PPQ", "OLQ", "ALQ","MSLQ",PCQ-2 and "SLQ" Effective January 1, 2010, a Sales and Use Tax Surcharge of .000083 per kilowatt-hour shall be applied to all consumer bills rendered under Rate Schedules set out above. The current surcharge shall remain in effect through December 31, 2010. Prior to the beginning of each subsequent year, the Cooperative will update the amount of the surcharge to reflect the estimated sales and use tax it expects to incur for that year plus any true-up amounts from the prior period.

438

Data:D045f2af-6b4f-465b-b015-d2ee4a986972 | Open Energy Information  

Open Energy Info (EERE)

af-6b4f-465b-b015-d2ee4a986972 af-6b4f-465b-b015-d2ee4a986972 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Detroit Edison Co Effective date: 2011/12/21 End date if known: Rate name: Electric Process Heating < 4.8 kV - 13.2 kV Primary - 0 - 11,500 kWh Sector: Industrial Description: Source or reference: www.dteenergy.com/pdfs/detroitEdisonTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

439

Data:4daa2810-d765-4458-a6bd-ab36cf2af70b | Open Energy Information  

Open Energy Info (EERE)

daa2810-d765-4458-a6bd-ab36cf2af70b daa2810-d765-4458-a6bd-ab36cf2af70b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hendricks County Rural E M C Effective date: 2012/04/01 End date if known: Rate name: SMALL COMMERCIAL- This rate schedule is multi-phase consumers with a demand of 50 KW/month or less. Sector: Commercial Description: Availability Available to any member of the organization located on its lines for rural, residential, farm, commercial and public buildings. This rate schedule will serve multi-phase member/consumers with an average demand of 50 KW/month or less. Type of service Alternating current, 60-cycle, multi-phase, 120/240 volts or other industry standard voltages mutually agreeable to the member consumer and the corporation.

440

Data:F6ccb605-3162-48c1-af09-08b1b8edaf5a | Open Energy Information  

Open Energy Info (EERE)

ccb605-3162-48c1-af09-08b1b8edaf5a ccb605-3162-48c1-af09-08b1b8edaf5a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland Center, Wisconsin (Utility Company) Effective date: 2007/07/09 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0582 per kilowatt-hour.

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Data:2a21b72e-e137-4bea-af72-99a4a9c4572a | Open Energy Information  

Open Energy Info (EERE)

b72e-e137-4bea-af72-99a4a9c4572a b72e-e137-4bea-af72-99a4a9c4572a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mille Lacs Energy Cooperative Effective date: End date if known: Rate name: Dual Fuel Space Heating Rate Sector: Description: Available to members taking service concurrently under another rate schedule. This rate is for interruptible service to electric space heating loads. Interruption to the space heating load can occur at anytime of day.The cumulative total of interruption can not exceed 400 hours during the heating season.The member must assume responsibility and provide an alternate non-electric automatic thermostatically controlled backup

442

Data:C334a922-f4bf-4d63-ac8c-17ebca173af7 | Open Energy Information  

Open Energy Info (EERE)

4a922-f4bf-4d63-ac8c-17ebca173af7 4a922-f4bf-4d63-ac8c-17ebca173af7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Stratford, Wisconsin (Utility Company) Effective date: 2008/11/18 End date if known: Rate name: Small Power- Time-of-Day Sector: Commercial Description: Customers that wish to be served on this rate must apply for service. Customers will be placed on the rate on a first-come, first-served basis as the appropriate meters become available. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

443

Data:C8ace342-22f7-4d2d-af9a-390a67532948 | Open Energy Information  

Open Energy Info (EERE)

42-22f7-4d2d-af9a-390a67532948 42-22f7-4d2d-af9a-390a67532948 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Norcross, Georgia (Utility Company) Effective date: 2008/04/01 End date if known: Rate name: Security Lighting Service (Metal Halide Flood 1,500W Lamp) Sector: Lighting Description: To property owners and tenants in the proximity of low voltage distribution lines of the City of Norcross. Service may be used to illuminate public thoroughfares and/or private outdoor areas, including, but not limited to, roadways, parking lots and yards. Fixture type: Metal Halide Flood Lamp Wattage: 1,500 Monthly Rate: $36.00 per fixture

444

Data:8e1543f0-58ad-4fed-b1af-7a9284b2e60a | Open Energy Information  

Open Energy Info (EERE)

f0-58ad-4fed-b1af-7a9284b2e60a f0-58ad-4fed-b1af-7a9284b2e60a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Danville, Virginia (Utility Company) Effective date: 2012/06/01 End date if known: Rate name: General Service- Large-secondary meter Sector: Industrial Description: Available for general service to any customer whose demand requirements exceed 500 kW and where delivery is at the secondary voltage of the transformer(s). Customers with a demand less than 500 kW may enter into an agreement for service based on a minimum demand charge of 500 kW. Source or reference: http://www.danville-va.gov/index.aspx?NID=1162

445

Data:A539af1a-2e63-4edd-8d3d-570b6ea4a29b | Open Energy Information  

Open Energy Info (EERE)

9af1a-2e63-4edd-8d3d-570b6ea4a29b 9af1a-2e63-4edd-8d3d-570b6ea4a29b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Menasha, Wisconsin (Utility Company) Effective date: 2011/04/06 End date if known: Rate name: Cp-4 Large Industrial Power Time-of-Day Service Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: This rate will be applied to customers for all types of service, if their monthly Maximum Measured Demand is in excess of 5,000 kW per month for three or more months in a consecutive 12-month period and their calculated Load Factor is greater than or equal to 85 percent.

446

Data:35688fa4-9469-48e1-84af-59de953bc13d | Open Energy Information  

Open Energy Info (EERE)

688fa4-9469-48e1-84af-59de953bc13d 688fa4-9469-48e1-84af-59de953bc13d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Readsboro, Vermont (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: Outdoor Lighting Rate 18- Street and Area Light (175 W Mercury Vapor) Sector: Lighting Description: Street, area and flood lighting, traffic signal and specialty lighting equipment, energy and maintenance service is available within Green Mountain Power Corporation's ("GMP") service territory under this rate for GMP-owned or Customer-owned equipment to any city, village, town, fire district, political subdivision, Customer association or individual Customer in accordance with the specifications hereinafter set forth.

447

Data:3e42dd08-3cf4-443d-a65d-9d872867af9c | Open Energy Information  

Open Energy Info (EERE)

dd08-3cf4-443d-a65d-9d872867af9c dd08-3cf4-443d-a65d-9d872867af9c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mt Carmel Public Utility Co Effective date: End date if known: Rate name: Rider B- Electric Fuel Adjustment Clause Sector: Description: [[OpenEI/UtilityRate/Description::Applicable to all Rates Except III CC No 8, 3rd Revised Sheet No 7 and 5th Revised sheet No 7.1, III C C No 8, 9th Revised Sheet No I I and III CC No 8, 7th Revised Sheet No 12. This rider is applicable to all kilowatt-hours (KWHS) of energy billed each month to customers served by the Company under the above designated rates and individual contracts on file with the Illinois Commerce Commission (Commission) where the charge for such energy Is subject to adjustment for increases and decreases in the cost of fuel.

448

Data:459fb3fe-6e94-4d48-aadc-5d8c3aab0af9 | Open Energy Information  

Open Energy Info (EERE)

fb3fe-6e94-4d48-aadc-5d8c3aab0af9 fb3fe-6e94-4d48-aadc-5d8c3aab0af9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bountiful, Utah (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Mobile home and house trailer park -Individual meters Sector: Residential Description: At any point on the BCLP's interconnected system where there are mobile home and house trailer parks taking electric service under this Schedule as of its effective date. This schedule is for alternating current single-phase electric service to be supplied at BCLP's available voltage through a single point of delivery at the Residential Service Rate for individual meters and at the Commercial Service Rate for master meters.An owner or proprietor receiving single point of delivery electric service under this rate schedule may include the cost of electric service in the rental or lease fee paid by the tenant, or the owner or proprietor may sub-meter each tenant for electric service rendered and bill each tenant their appropriate share of the electric charges based on the master meter billing and the sub-meter readings.

449

Data:1efca7a1-11d8-459c-bd00-f4f02b16af54 | Open Energy Information  

Open Energy Info (EERE)

efca7a1-11d8-459c-bd00-f4f02b16af54 efca7a1-11d8-459c-bd00-f4f02b16af54 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Jasper, Indiana (Utility Company) Effective date: 2009/09/01 End date if known: Rate name: Security Lighting (400 W Mercury Vapor) Sector: Lighting Description: Applicable only for continuous year-round outdoor lighting service. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

450

Data:920dff4a-f5d9-4299-bcac-dcf3d189c873 | Open Energy Information  

Open Energy Info (EERE)

dff4a-f5d9-4299-bcac-dcf3d189c873 dff4a-f5d9-4299-bcac-dcf3d189c873 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rappahannock Electric Coop Effective date: 2009/11/01 End date if known: Rate name: LARGE POWER HIGH DIVERSITY SERVICE SCHEDULE HD-1 Sector: Industrial Description: APPLICABILITY Applicable upon request to Customers otherwise served under the LP-1 Schedules and contracting for a load of 500 kW or more. Demand Delivery Charge: All kW of Maximum Billing Demand delivered @ $ 1.10 per kW Excess Demand: @ $2.38 per kW Source or reference: http://www.myrec.coop/content-documents/ScheduleHD-1-Nv09.pdf

451

Data:8103faa5-2a94-47af-8d3e-54f400b90701 | Open Energy Information  

Open Energy Info (EERE)

8103faa5-2a94-47af-8d3e-54f400b90701 8103faa5-2a94-47af-8d3e-54f400b90701 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Arkansas Inc (Arkansas) Effective date: 2013/04/01 End date if known: Rate name: 2 REMT residential management time-of-use Sector: Residential Description: For residential service to single family residences or individual family apartments supplied through one meter, including incidental family use, on the appurtenant premises. This rate is not applicable to commercial type use on the premises is used for nonresidential purposes, the predominant use of the service, as determined by the company, shall determine the predominant use of the service. Service is for the use of the customer and may not be shared and may not be resold to others. Not applicable to standby or supplementary service. Customers currently taking service under the company's optional residential time-of--use rate may terminate that service and begin service under this schedule provided they have completed twelve continuous months of service under schedule RT.

452

Data:Bd1ce9c6-ed66-4ab0-8b4a-f0551718d14d | Open Energy Information  

Open Energy Info (EERE)

c6-ed66-4ab0-8b4a-f0551718d14d c6-ed66-4ab0-8b4a-f0551718d14d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Leigh, Nebraska (Utility Company) Effective date: 2013/01/15 End date if known: Rate name: Area Lighting - 400 W Mercury Vapor- Customer Owned Sector: Lighting Description: To any customer who contracts for lighting of outdoor areas not provided for by the District's Street Lighting Schedules. Service shall be provided from dusk until dawn or approximately 4,000 hours per annum. The customer may purchase and own the area lighting equipment. The District will install and maintain the equipment, and bill the customer for installation and maintenance. The District will furnish unmetered current on a flat monthly charge.

453

Data:3abaa96c-197c-41ea-af78-40ffd5c5355a | Open Energy Information  

Open Energy Info (EERE)

abaa96c-197c-41ea-af78-40ffd5c5355a abaa96c-197c-41ea-af78-40ffd5c5355a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shenandoah Valley Elec Coop Effective date: 2001/01/01 End date if known: Rate name: SCHEDULE B-10 (UNBUNDLED) GENERAL SERVICE COMMERCIAL V2 Sector: Commercial Description: AVAILABILITY Available to all member/customers for general service, commercial, industrial, single or multi-phase service, and all other non-residential service for all uses subject to the established rules and regulations of the Cooperative. First 20 kilowatts of billing demand - No Demand Charge All kilowatts of billing demand in excess of 20 -$6.71 per kW

454

Data:4a5d0af9-f0df-446f-9b6a-add2725e1d39 | Open Energy Information  

Open Energy Info (EERE)

af9-f0df-446f-9b6a-add2725e1d39 af9-f0df-446f-9b6a-add2725e1d39 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ameren Illinois Company Effective date: 2010/11/19 End date if known: Rate name: DS-2 Zone 1 - Small General Delivery Service 600V or Less Sector: Commercial Description: AVAILABILITY Service under this Rate is available for any eligible Non-Residential Customer within the territory served by Company that meets the following criteria: Customers served under this Rate shall have a maximum monthly Demand of less than 150 kilowatts (kW) as qualified in the Delivery Service Rate Reassignment section. A Customer without a demand meter installed, but with an average usage of less than 1,200 kWh per day during each monthly billing period will be normally assumed to have a maximum monthly Demand of less than 150 kW. Where Customer's average daily usage is 1,200 kWh per day or more in any monthly billing period, Company may install a demand meter at Company's expense to determine if Customer remains eligible for service under this Rate.

455

Data:394dbac3-e310-48b4-8b9a-f3e6ba8f8312 | Open Energy Information  

Open Energy Info (EERE)

dbac3-e310-48b4-8b9a-f3e6ba8f8312 dbac3-e310-48b4-8b9a-f3e6ba8f8312 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pontotoc Electric Power Assn Effective date: 2013/07/01 End date if known: Rate name: Security Light HPS 100 W 30' pole Sector: Lighting Description: Source or reference: http://www.sitemason.com/files/fjDo1q/May%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2

456

Data:2ad9ec02-0fe7-45ab-af0a-338e9e684f47 | Open Energy Information  

Open Energy Info (EERE)

2-0fe7-45ab-af0a-338e9e684f47 2-0fe7-45ab-af0a-338e9e684f47 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: A & N Electric Coop Effective date: 2008/01/02 End date if known: Rate name: Former Delmarva Power Territory: Private Area Lighting-Enclosed Bottom-High Pressure Sodium-100 W Sector: Lighting Description: Estimated Average Monthly Usage: 50kWh Rates are subject to wholesale power cost adjustments. Terms and conditions apply. Source or reference: http://www.anec.com/yourbill/rate_pdfs/AST_PL.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

457

Data:1b976801-a57f-40e0-819a-f0cf0ebebe2c | Open Energy Information  

Open Energy Info (EERE)

6801-a57f-40e0-819a-f0cf0ebebe2c 6801-a57f-40e0-819a-f0cf0ebebe2c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Eau Claire Electric Coop Effective date: 2012/05/21 End date if known: Rate name: SINGLE OR THREE-PHASE SERVICE - ANNUAL AVERAGE DEMAND Sector: Industrial Description: Availability Available under established rules and regulations to any non-residential customer for single or three-phase electric service. Determination of feasibility and availability shall be made by the Cooperative for each request for electric power supply to loads in the Cooperative's service area. Once the customer's 15-minute measured demands are equal to or greater than 300 kW for at least 4 of 12 months, the customer will be transferred to the applicable demand-based rate. A contract will be required for each such service which establishes conditions of service.

458

Data:A39c4b47-f8b6-40af-8fb2-ab188ce46084 | Open Energy Information  

Open Energy Info (EERE)

A39c4b47-f8b6-40af-8fb2-ab188ce46084 A39c4b47-f8b6-40af-8fb2-ab188ce46084 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Electric Coop, Inc (Florida) Effective date: End date if known: Rate name: Outdoor Lighting HPS 150 W Sector: Lighting Description: Source or reference: http://www.tcec.com/myBusiness/resSinglePhase.aspx Source Parent: http://www.tcec.com/ Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

459

Data:74e64121-b97a-4af7-8d17-4bf526e1b5fc | Open Energy Information  

Open Energy Info (EERE)

121-b97a-4af7-8d17-4bf526e1b5fc 121-b97a-4af7-8d17-4bf526e1b5fc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Argyle, Wisconsin (Utility Company) Effective date: 2008/05/29 End date if known: Rate name: Gs-1 General Service Single Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 40 kilowatts for three or more months in a consecutive 12-month period. Motors may not exceed 10 horsepower individual-rated capacity without utility permission.

460

Data:14b0b7bb-3bc0-4c00-8b0f-2af1fbdad117 | Open Energy Information  

Open Energy Info (EERE)

b0b7bb-3bc0-4c00-8b0f-2af1fbdad117 b0b7bb-3bc0-4c00-8b0f-2af1fbdad117 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Woodruff Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Outdoor lighting - Street Lights 400 W MVL Sector: Lighting Description: To unmetered automatically controlled outdoor lighting service burning all night. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Data:37b04e32-89ae-4af3-9dc8-81abcc99ae02 | Open Energy Information  

Open Energy Info (EERE)

2-89ae-4af3-9dc8-81abcc99ae02 2-89ae-4af3-9dc8-81abcc99ae02 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Miami-Cass County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: RATE SCHEDULE LP-2 Sector: Industrial Description: The Miami-Cass County Rural Electric Membership Corporation (REMC) shall charge and collect for large industrial electric service on the following bases of availability, application, character of service, monthly rate, minimum charge, purchased power cost adjustment clause, and tax adjustment. AVAILABILITY: This schedule is available to any member of the REMC located within the territory served by Miami-Cass County Rural Electric Membership Corporation.

462

Data:631bc4ee-db88-4b64-980b-2500af89f756 | Open Energy Information  

Open Energy Info (EERE)

bc4ee-db88-4b64-980b-2500af89f756 bc4ee-db88-4b64-980b-2500af89f756 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Mt Horeb, Wisconsin (Utility Company) Effective date: 2009/04/01 End date if known: Rate name: Cp-2 Large Power Optional 12-hr On-Peak Time-of-Day Service Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

463

Data:2f6fa2af-6016-4df4-94b0-d98183a03aa1 | Open Energy Information  

Open Energy Info (EERE)

af-6016-4df4-94b0-d98183a03aa1 af-6016-4df4-94b0-d98183a03aa1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Gs-2 General Service-Optional Time-of-Day Service Single Phase(7am-7pm) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0765 per kilowatt-hour.

464

Data:9e3b7ddf-af2c-4ec9-b321-21bb6b20e5ce | Open Energy Information  

Open Energy Info (EERE)

ddf-af2c-4ec9-b321-21bb6b20e5ce ddf-af2c-4ec9-b321-21bb6b20e5ce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2012/08/22 End date if known: Rate name: RATE NO. 02 SMALL COMMERCIAL SERVICE-Underground Primary Service Sector: Commercial Description: Applicability: To all small retail businesses such as stores, shops, schools and other enterprises without demand metering and whose estimated monthly maximum demand is less than 50kW. Service is applied at one(1) point of delivery and measured through one meter. Source or reference: http://www.ed3online.org/view/70

465

Data:Af5d34ea-c9d4-4155-8c46-f4673d7ae513 | Open Energy Information  

Open Energy Info (EERE)

Af5d34ea-c9d4-4155-8c46-f4673d7ae513 Af5d34ea-c9d4-4155-8c46-f4673d7ae513 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rochester Gas & Electric Corp Effective date: 2013/11/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 3 GENERAL SERVICE - 100 KILOWATTS MINIMUM ESS (Retail Access Rate Choice) Sector: Commercial Description: This Retail Access choice includes fixed components for RG&E delivery service, a Transition Charge ( Non-Bypassable Charge ["NBC"] as described in Section 12.B.), and a Bill Issuance Charge. Customers that elect ESS and receive a Consolidated Bill will not be subject to the Bill Issuance Charge. An Energy Service Services Company ("ESCO") provides Electric Power Supply to the customer. RG&E provides the delivery service only.

466

Data:C8be76ce-4dfd-480e-bd9a-f48ab3f9ae60 | Open Energy Information  

Open Energy Info (EERE)

be76ce-4dfd-480e-bd9a-f48ab3f9ae60 be76ce-4dfd-480e-bd9a-f48ab3f9ae60 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: KEM Electric Coop Inc Effective date: End date if known: Rate name: Dual Heat Service - 3M Sector: Commercial Description: Available to all members under the GS-1 rate, where electric heat is the primary source of heating, with a backup heating system, also include installed air conditioning and off-peak water heating, which meets Cooperative specifications. Service shall be to a single point of service. Type of Service Single Phase, 60 cycles, at secondary voltages. The Cooperative will provide meter, meter socket, CT equipment, and load management device necessary to measure and interrupt electric usage.

467

Data:26af4477-6a7e-4380-83d1-8087ec797dce | Open Energy Information  

Open Energy Info (EERE)

af4477-6a7e-4380-83d1-8087ec797dce af4477-6a7e-4380-83d1-8087ec797dce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sulphur Springs Valley E C Inc Effective date: 2013/03/18 End date if known: Rate name: Street Lighting: 250 Watt HPS - Single/Wood Sector: Lighting Description: Customer provided Facilities and Cooperative Owned and Maintained Lighting Service. Source or reference: http://www.ssvec.org/wp-content/uploads/downloads/2013/03/SSVEC-Rates-03.18.13.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

468

Data:3925d4bd-78d7-45fb-a4af-e0459fb853b1 | Open Energy Information  

Open Energy Info (EERE)

d4bd-78d7-45fb-a4af-e0459fb853b1 d4bd-78d7-45fb-a4af-e0459fb853b1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Miami-Cass County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Security Lights Metered 400 watt mercury vapor (120 V) Sector: Lighting Description: The Miami-Cass County Rural Electric Membership Corporation (REMC) shall charge and collect for security lighting service on the following bases of availability, character of service, monthly rate, and tax adjustment. AVAILABILITY: Available to any member of the REMC for continuous year round service for outdoor lighting where 120 volt service exists ahead of the meter loop.

469

Data:C429527a-0f8a-4833-ac69-2baf0af3b3b6 | Open Energy Information  

Open Energy Info (EERE)

7a-0f8a-4833-ac69-2baf0af3b3b6 7a-0f8a-4833-ac69-2baf0af3b3b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeastern Power Admin Effective date: End date if known: Rate name: Wholesale Power Rate Schedule CC-1-I Sector: Commercial Description: Source or reference: http://199.44.84.82/files/CC-1-I.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

470

Data:5ff6f4f0-b96e-4eb3-b960-38c1af272ab1 | Open Energy Information  

Open Energy Info (EERE)

ff6f4f0-b96e-4eb3-b960-38c1af272ab1 ff6f4f0-b96e-4eb3-b960-38c1af272ab1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Stratford, Wisconsin (Utility Company) Effective date: 2008/11/18 End date if known: Rate name: Residential- Three- Phase- Time-of-Day- Peak: 9am-9pm Sector: Residential Description: This rate schedule is optional to all Rg-1, Residential Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

471

Data:D495ab52-c999-44a4-af72-2fea73dd9e96 | Open Energy Information  

Open Energy Info (EERE)

ab52-c999-44a4-af72-2fea73dd9e96 ab52-c999-44a4-af72-2fea73dd9e96 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2008/08/18 End date if known: Rate name: Gs-1 General Service Single Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0756 per kilowatt-hour.

472

Data:8ff64bc8-a3af-4285-83a5-eb235f1bc98b | Open Energy Information  

Open Energy Info (EERE)

4bc8-a3af-4285-83a5-eb235f1bc98b 4bc8-a3af-4285-83a5-eb235f1bc98b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wisconsin Rapids W W & L Comm Effective date: 2009/01/01 End date if known: Rate name: Street Lighting Metal Halide 400 W Overhead Sector: Lighting Description: The Purchase Cost Adjustment Clause, a charge per all kWh that varies monthly, applies to this rate. Source or reference: http://www.wrwwlc.com/StreetYard.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

473

Data:D3b69af5-5545-4c56-8fe4-d069290d831a | Open Energy Information  

Open Energy Info (EERE)

b69af5-5545-4c56-8fe4-d069290d831a b69af5-5545-4c56-8fe4-d069290d831a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeastern Rural E M C Effective date: 2004/02/27 End date if known: Rate name: Outdoor Lighting Energy: Ballasted Lamps 400W Sector: Lighting Description: I. AVAILABILITY Service is available to any developer, community association, or governmental authority where 120-volt service exists. The cost of service provides for electricity only from existing Northeastern REMC (Northeastern) facilities. Any investment occasioned by the extension of secondary lines or the installation of a transformer for the sole purpose of this service shall require a contract setting forth the charge for the additional investment.

474

Data:Ead8afcd-d2df-4af4-9d0e-2f446d85a98e | Open Energy Information  

Open Energy Info (EERE)

Ead8afcd-d2df-4af4-9d0e-2f446d85a98e Ead8afcd-d2df-4af4-9d0e-2f446d85a98e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Flint Electric Membership Corp Effective date: 2007/04/01 End date if known: Rate name: Outdoor Lighting GUS Cobrahead HPS 400 W Sector: Lighting Description: POLE CHARGES Type, Charge 30' Wood $205.00 35' Wood $220.00 16' Aluminum (Brushed) $250.00 16' Fiberglass (Black) $300.00 16' Fiberglass (Acorn, Black) $800.00 30' Steel & Sub Base $1325.00 30' Fiberglass with 6' Arm $625.00 30' Fiberglass with 2 - 6' Arm $725.00 Source or reference: http://www.flintenergies.com/myHome/residentialRates/covenantStreetLighting.aspx

475

Data:2490a6af-e189-42e4-ae82-4bc2282ee035 | Open Energy Information  

Open Energy Info (EERE)

af-e189-42e4-ae82-4bc2282ee035 af-e189-42e4-ae82-4bc2282ee035 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbus Southern Power Co Effective date: 2012/03/09 End date if known: Rate name: Experimental Small General Service Time-of-Day Sector: Commercial Description: Available on a voluntary, experimental basis for general service to customers with maximum demands less than 10 kW through one single-phase, multi-register meter capable of measuring electrical energy consumption during variable pricing periods. Availability is restricted to customers served by the circuits designated for the Company's gridSMART program. This tariff will be in effect for a minimum of one (1) year.

476

Data:200baf00-769d-41bf-a4e5-698d02af43a3 | Open Energy Information  

Open Energy Info (EERE)

baf00-769d-41bf-a4e5-698d02af43a3 baf00-769d-41bf-a4e5-698d02af43a3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rolling Hills Electric Coop Effective date: 2010/07/01 End date if known: Rate name: Large Power (LP-10) Three phase for a demand of not less than 200 kW. Sector: Commercial Description: Three phase - consumer contracts for a demand of not less than 200 kW. Demand Charge: $/ kW with minimum 200 kW billed ($2,400.00) Source or reference: http://rollinghills.coopwebbuilder.com/sites/rollinghills.coopwebbuilder.com/files/rate_tariffs.pdf Source Parent: Comments Applicability Demand (kW)

477

Data:280ddd3f-af9b-48e6-ba8d-27a9bc943c7e | Open Energy Information  

Open Energy Info (EERE)

ddd3f-af9b-48e6-ba8d-27a9bc943c7e ddd3f-af9b-48e6-ba8d-27a9bc943c7e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Landis, North Carolina (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Industrial Service Sector: Industrial Description: A 1.03% tax included on this rate Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

478

Data:B415b3a3-9b95-4af4-b0d0-dedc061b6cbf | Open Energy Information  

Open Energy Info (EERE)

a3-9b95-4af4-b0d0-dedc061b6cbf a3-9b95-4af4-b0d0-dedc061b6cbf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/03/28 End date if known: Rate name: General Service - Three-Phase less than 100kW Sector: Industrial Description: Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 100 kilowatts for three or more months in a consecutive 12-month period. Gs-1 customers billed on this rate shall continue to be billed on this rate until their monthly Maximum Measured Demand is greater than 100 kilowatts per month for three or more months in a consecutive 12 month period, at which time the customers will be transferred to the appropriate rate class. Gs-1 General Service $2.25 per customer per month

479

Data:3af203b9-442f-4679-8f29-f4c67f539d29 | Open Energy Information  

Open Energy Info (EERE)

af203b9-442f-4679-8f29-f4c67f539d29 af203b9-442f-4679-8f29-f4c67f539d29 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mascoutah, Illinois (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Customer Area Lighting Service- Rate 7: Mercury Vapor, 9,400 Lumen, 250 Watt Sector: Lighting Description: Note: pole rental add $1.00 per month Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

480

Data:9c0d51b6-109c-46c6-af9a-5c02b629ddf9 | Open Energy Information  

Open Energy Info (EERE)

d51b6-109c-46c6-af9a-5c02b629ddf9 d51b6-109c-46c6-af9a-5c02b629ddf9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2011/09/01 End date if known: Rate name: Large Commercial Critical Peak Single Phase Pricing Sector: Commercial Description: Source or reference: http://www.sawnee.com/Rate%20Pdfs/CPPC.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

Note: This page contains sample records for the topic "turhollow af graham" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Data:660cea50-00d2-4501-8af5-541a79a6b8fa | Open Energy Information  

Open Energy Info (EERE)

cea50-00d2-4501-8af5-541a79a6b8fa cea50-00d2-4501-8af5-541a79a6b8fa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Courtland, Alabama (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: TOU-GSB Sector: Industrial Description: Source or reference: ISU-Binder Ted #4 Source Parent: Comments note: there is also a $350 administrative charge Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

482

Data:99a10750-954a-41a5-91af-f809ad3c2b44 | Open Energy Information  

Open Energy Info (EERE)

50-954a-41a5-91af-f809ad3c2b44 50-954a-41a5-91af-f809ad3c2b44 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Owatonna, Minnesota (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Commercial service rate Sector: Commercial Description: (Service Description - under 480,000 kWh/year and under 300 KW/month in the previous months of June-Sept) 1.Load Management - 5% Credit on Commodity Charge & EAA applied year round (beginning 2/1/2010, it will only be calculated on the Commodity Charge). 2.Electric Heat/Geothermal - 15% Credit on Commodity Charge & EAA applied year round (beginning 2/1/2010, it will only be calculated on the Commodity Charge). 3.Energy Conservation Investment (ECI) charge of 1.5% applied to total bill

483

Data:23a5f770-a24a-4d4e-a49d-af9aded1b621 | Open Energy Information  

Open Energy Info (EERE)

f770-a24a-4d4e-a49d-af9aded1b621 f770-a24a-4d4e-a49d-af9aded1b621 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oregon Trail El Cons Coop, Inc Effective date: 2011/10/01 End date if known: Rate name: Large Commercial, Schedule G2 Sector: Commercial Description: Available in OTEC service territory for non-residential service requiring more than 50 kVA and less than 1,000 kVA of transformer capacity, subject to policies as established by the Board of Directors. Minimum monthly bill: Shall be the monthly delivery charge plus $1.00/kVA of installed transformer capacity and applicable taxes. Demand and energy charges shall be an offset to the installed transformer capacity charges.

484

Data:274b7807-4b37-47a7-9201-2a757af2e2cf | Open Energy Information  

Open Energy Info (EERE)

807-4b37-47a7-9201-2a757af2e2cf 807-4b37-47a7-9201-2a757af2e2cf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Barron, Wisconsin (Utility Company) Effective date: 2009/07/15 End date if known: Rate name: Ms-1 Street and Security Lighting Service: 400 W MV(Fiberglass Pole) Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting and private security lighting. The utility will furnish, install, and maintain all lighting units. Metering: In lieu of metering each lamp unit, the utility will meter one or more of each size and type of lamp unit that operates for a similar time period each month. Each unit of the same size, type and on-time period shall be billed the average amount of energy as used by the metered unit(s) of the same size, type and on-time period. Pole Charges: Wood - Distribution $1.00 per lamp per month Wood- Stand Alone $3.25 per lamp per month Fiberglass $6.25 per lamp per month Steel $8.00 per lamp per month

485

Data:848661c6-2e4e-452e-8ed6-db0af5008846 | Open Energy Information  

Open Energy Info (EERE)

61c6-2e4e-452e-8ed6-db0af5008846 61c6-2e4e-452e-8ed6-db0af5008846 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Johnson County Rural E M C Effective date: 2010/04/01 End date if known: Rate name: Outdoor Lighting: STN, Cobra Head, High Pressure Sodium, 150W Sector: Lighting Description: Availability Available to any member of the Corporation entering into a contract for said service where 120 volt service exists for the use of street and security lighting. All lights must exist in a truck accessible location. Maintenance of Lighting System The Corporation will repair and/or replace and maintain all equipment owned by the Corporation, including lamps and glassware, which may be necessary to provide continuous operation of the street and security lighting.

486

Data:5f4e37ad-192a-4981-af3d-e9be532d1b40 | Open Energy Information  

Open Energy Info (EERE)

192a-4981-af3d-e9be532d1b40 192a-4981-af3d-e9be532d1b40 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/01/31 End date if known: Rate name: RIDER TO SCHEDULE LIS Sector: Industrial Description: This Rider Schedule is applicable, subject to the terms and conditions hereinafter set forth, to additional service in conjunction with Firm Power Service to Customer under Rate Schedule LIS, when prearrangement has been made for the installation of facilities of adequate capacity and suitable phase and voltage adjacent to the premises to be served. All service is supplied at one location and at the voltage prescribed in Rate Schedule LIS so as to permit delivery and metering

487

Data:F9c01814-383d-456f-af87-0ae096eb9301 | Open Energy Information  

Open Energy Info (EERE)

c01814-383d-456f-af87-0ae096eb9301 c01814-383d-456f-af87-0ae096eb9301 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jay County Rural E M C Effective date: End date if known: Rate name: SCHEDULE SL- STREET OR SECURITY LIGHTING RATE (400 Watt) Sector: Lighting Description: Dusk to dawn lighting service, using photo-electric controlled equipment, mast arm, street light type luminaire and 175 or 400 watt Mercury Vapor lamps, maintenance of the complete assembly and the cost of its electrical operation are included in this service. Any additional investment required by the extension of secondary lines or hanging of a transformer, for the sole purpose of this service, will require a contribution by the member.

488

Data:0831a659-fb83-4a0c-9a53-991af3e636df | Open Energy Information  

Open Energy Info (EERE)

a659-fb83-4a0c-9a53-991af3e636df a659-fb83-4a0c-9a53-991af3e636df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Barron, Wisconsin (Utility Company) Effective date: 2009/07/15 End date if known: Rate name: Ms-1 Street and Security Lighting Service: 250 W HPS(Fiberglass) Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting and private security lighting. The utility will furnish, install, and maintain all lighting units. Metering: In lieu of metering each lamp unit, the utility will meter one or more of each size and type of lamp unit that operates for a similar time period each month. Each unit of the same size, type and on-time period shall be billed the average amount of energy as used by the metered unit(s) of the same size, type and on-time period. Pole Charges: Wood - Distribution $1.00 per lamp per month Wood- Stand Alone $3.25 per lamp per month Fiberglass $6.25 per lamp per month Steel $8.00 per lamp per month

489

Data:0a4718ec-d36d-4135-90ac-89a8af83b8c4 | Open Energy Information  

Open Energy Info (EERE)

ec-d36d-4135-90ac-89a8af83b8c4 ec-d36d-4135-90ac-89a8af83b8c4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Indiana Inc Effective date: 2009/09/14 End date if known: Rate name: AL - 150 watt HPS - Cobra Sector: Lighting Description: Availability This rate schedule is no longer available after September 1, 2004. Potential lighting customers wanting a lighting system installed and maintained by Company can do so via the Outdoor Lighting Equipment agreement (OLE). Potential customers should contact a Company account representative for further information concerning OLE options. This rate schedule terminates May 1, 2014. Customers currently being provided service under this rate schedule can continue being provided service under this rate schedule until their contract expires or this rate schedule terminates, whichever occurs first.

490

Data:07d6ee9d-f2a2-46b3-8003-b11060726af6 | Open Energy Information  

Open Energy Info (EERE)

ee9d-f2a2-46b3-8003-b11060726af6 ee9d-f2a2-46b3-8003-b11060726af6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of St Marys, Ohio (Utility Company) Effective date: 2001/06/10 End date if known: Rate name: Commercial General Service Transmission Rate Sector: Commercial Description: *This rate is available for lighting and power for those customers establishing a minimum of 3,000 KW demand. character of service:Standard transmission service voltages as provided in rules and regulations, Alternating Current 60 Hertz (cycles per second). minimum monthly charge:The minimum monthly charge will be based upon a billing demand of no less than 3,000 KW demand.

491

Data:1b7496e1-290a-457d-95af-ba37825b2699 | Open Energy Information  

Open Energy Info (EERE)

290a-457d-95af-ba37825b2699 290a-457d-95af-ba37825b2699 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Indiana REMC Effective date: 2010/09/01 End date if known: Rate name: General Power Service Multi-phase(Schedule GP - SEA) Sector: Commercial Description: Availability Available as an optional rate to any consumer of the Corporation for single-phase and multiphase retail or commercial electric service at a single delivery point with a transformer capacity of 50 KVA or less. A consumer choosing this optional rate must remain on the rate for a minimum of six months. Consumers opting to change to a different rate schedule after the six month minimum period must wait a minimum of six months before returning to this optional rate. Type of Service Single-phase and multi-phase, sixty (60) cycles at the following standard voltages: 120/240, 120/208, 277/480, 240/480.

492

Data:A48fdf78-6a6f-4d22-b78b-8c457af267eb | Open Energy Information  

Open Energy Info (EERE)

fdf78-6a6f-4d22-b78b-8c457af267eb fdf78-6a6f-4d22-b78b-8c457af267eb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Decatur County Rural E M C Effective date: 2010/04/01 End date if known: Rate name: DIRECTIONAL SECURITY LIGHT ELECTRIC SERVICE (MERCURY VAPOR) 20,000 lumens Sector: Lighting Description: Dusk to dawn lighting service, using photo-electric controlled equipment, mast arm, street light type luminare with lamp, maintenance of the complete assembly and the cost of electrical operation are included in this service. Any additional investment beyond one span of secondary line and one pole, for the sole purpose of providing this service, will require a contribution by the member.

493

Data:5a9e21af-3012-46ef-8472-9986bd4a2aaf | Open Energy Information  

Open Energy Info (EERE)

af-3012-46ef-8472-9986bd4a2aaf af-3012-46ef-8472-9986bd4a2aaf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Gresham, Wisconsin (Utility Company) Effective date: 2010/07/01 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand Primary Metering Discount with Parallel Generation(20 kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0627 per kilowatt-hour.

494

Data:81694981-40b6-4428-8aad-af4958d1e3b0 | Open Energy Information  

Open Energy Info (EERE)

81-40b6-4428-8aad-af4958d1e3b0 81-40b6-4428-8aad-af4958d1e3b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers Electric Company, Ltd Effective date: 2012/06/01 End date if known: Rate name: Large Power- Single Phase Sector: Commercial Description: 50kW but less than 1000kW Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

495