National Library of Energy BETA

Sample records for tube target loading

  1. EA-1131: Relocation of Neutron Tube Target Loading Operation, Los Alamos Laboratory, Los Alamos, New Mexico

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to relocate the Neutron Tube Target Loading operations at the U.S. Department of Energy Los Alamos National Laboratory in New Mexico from...

  2. How loads affect coiled tubing life

    SciTech Connect (OSTI)

    Walker, E.J. Inc., AK )

    1992-01-01

    Fatigue testing was performed on 1-3/4-in OD, 0.125 in. wall thickness (WT) coiled tubing using a standard coiled tubing unit (CTU) as shown in this paper. Testing was conducted under Prudhoe Bay, Alaska oil well, conditions to determine the effects of axial load, internal pressure and bending stress on the longevity, or usable running footage, that can be expected with larger diameter tubing. The CTU was rigged up in a standard configuration with injector head 50 ft off the ground, the worst case for bending on most currently available North Slope units. Internal pressure was supplied by a small triplex pump and the end of tubing was closed off with a fishing neck and bull plug. Weight, for the first four tests, was suspended from the coiled tubing by a special clamp. The tubing was cycled up and over the guide arch until a loss of internal coiled tubing pressure (CTP) occurred, or until the tubing became stuck in the stripper brass.

  3. An effective loading method of americium targets in fast reactors

    SciTech Connect (OSTI)

    Ohki, Shigeo; Sato, Isamu; Mizuno, Tomoyasu; Hayashi, Hideyuki; Tanaka, Kenya

    2007-07-01

    Recently, the development of target fuel with high americium (Am) content has been launched for the reduction of the overall fuel fabrication cost of the minor actinide (MA) recycling. In the framework of the development, this study proposes an effective loading method of Am targets in fast reactors. As a result of parametric survey calculations, we have found the ring-shaped target loading pattern between inner and outer core regions. This loading method is satisfactory both in core characteristics and in MA transmutation property. It should be noted that the Am targets can contribute to the suppression of the core power distribution change due to burnup. The major drawback of Am target is the production of helium gas. A target design modification by increasing the cladding thickness is found to be the most feasible measure to cope with the helium production. (authors)

  4. Refrigeration Recovery for Experiment Hall High Target Loads

    SciTech Connect (OSTI)

    Peter Knudsen, Venkatarao Ganni, Errol Yuksek, Jonathan Creel

    2010-04-01

    The Qweak experiment at Jefferson Lab (JLab) is a 3000 W hydrogen target scheduled for the summer of 2010 and running for two years until the planned shut-down for 12GeV. The End Station Refrigerator (ESR) supports the three experiment halls, two of which may normally have a hydrogen target. The refrigerator for the ESR is a CTI/Helix 1500 W 4.5-K refrigerator nominally capable of supporting a 1250 W target load at 12 bar and 15-K (plus 1100 W of 4.5-K refrigeration). As such, this refrigerator is not capable of supporting the Qweak experiment target load in its present condition. Additionally, since the installation of an ambient air vaporizer for a single use, two week run duration of a high target load in the summer of 2003 there has been a consistent usage of the Central Helium Liquefier’s (CHL’s) 3 bar 4.5-K helium, supplied via an existing transfer-line to the ESR, for other high target loads. By the fall of 2004, it was apparent that this continued use of CHL’s supercritical helium was routinely being sought by the hall experimenters. As such, a method of refrigeration recovery was proposed to reduce the support required of CHL for these high target loads, including the anticipated Qweak experiment, while utilizing the recovered CHL refrigeration from the target to increase ESR’s 12 bar 15-K capacity.

  5. Neutron tubes

    DOE Patents [OSTI]

    Leung, Ka-Ngo; Lou, Tak Pui; Reijonen, Jani

    2008-03-11

    A neutron tube or generator is based on a RF driven plasma ion source having a quartz or other chamber surrounded by an external RF antenna. A deuterium or mixed deuterium/tritium (or even just a tritium) plasma is generated in the chamber and D or D/T (or T) ions are extracted from the plasma. A neutron generating target is positioned so that the ion beam is incident thereon and loads the target. Incident ions cause D-D or D-T (or T-T) reactions which generate neutrons. Various embodiments differ primarily in size of the chamber and position and shape of the neutron generating target. Some neutron generators are small enough for implantation in the body. The target may be at the end of a catheter-like drift tube. The target may have a tapered or conical surface to increase target surface area.

  6. Targeted chlorination for biofouling control in steam electric power plant condenser tubes

    SciTech Connect (OSTI)

    Tewari, R.N.

    1991-01-01

    The objective of this study was to develop an understanding of the relationships between biofouling, heat transfer, and to assess the technical feasibility of the targeted chlorination (TC) concept as an alternative to conventional chlorination in once-through seawater cooling systems. A shell and tube type heat exchanger was designed and constructed. The test facility monitored biofouling growth by measuring heat transfer resistance (thermal performance), pressure drop (hydraulic performance), and biomass deposit. Biocide effectiveness was determined by triplicates average residual biomass. Tests were run to evaluate 18 treatment scenarios. Preliminary tests were done to determine variabilities between shells and among tubes, effect of heating, very high dose chlorine burn out and regrowth behavior. LOGIT, a software package by the National Bureau of Standards (NBS) for sigmoidal fit, was used for the preliminary test data. The other three tests studied effect of chlorine dosage (low, high), contact time, and frequency. To minimize variability in results, triplicates for each chlorination scheme were used. The total amount of chlorine applied (flow rate Q x C x T x F) ranged from about 400 to 4,000 pounds per million gallons per day (an equivalent to a CTF range of 6 to 60 ppm.min/day). With respect to efficiency of biofouling control, it was found by regression analysis that among four variables C, T, (CT) and F, F was most significant and C, T, and (CT) were relatively equal in ranking.

  7. Performance Validation of Refrigeration Recovery for Experimental Hall High Target Loads

    SciTech Connect (OSTI)

    Errol Yuksek, Venkatarao, Ganni,Robert Norton, Peter Knudsen

    2012-07-01

    The Qweak experiment at Jefferson Lab (JLab) is a 3000 W hydrogen target scheduled to run until the planned shutdown in the spring of 2012 for the 12 GeV installation. As detailed in previous proceedings, support of this target's cryogenic load was made possible by incorporating modifications to the End Station Refrigerator (ESR) to recover the refrigeration supplied by the Central Helium Liquefier (CHL). Testing and commissioning for these modifications was performed in January and February 2010 demonstrating that the performance met or exceeded projected expectations. In this paper, we present the analysis of the test results in regards to the actual loads capable of being supported and the process boundaries encountered, as well as a discussion of the commissioning results for the cryogenic support of the Qweak target.

  8. QUANTIZING TUBE

    DOE Patents [OSTI]

    Jensen, A.S.; Gray, G.W.

    1958-07-01

    Beam deflection tubes are described for use in switching or pulse amplitude analysis. The salient features of the invention reside in the target arrangement whereby outputs are obtained from a plurality of collector electrodes each correspondlng with a non-overlapping range of amplitudes of the input sigmal. The tube is provded with mcans for deflecting the electron beam a1ong a line in accordance with the amplitude of an input signal. The target structure consists of a first dymode positioned in the path of the beam wlth slots spaced a1ong thc deflection line, and a second dymode posltioned behind the first dainode. When the beam strikes the solid portions along the length of the first dymode the excited electrons are multiplied and collected in separate collector electrodes spaced along the beam line. Similarly, the electrons excited when the beam strikes the second dynode are multiplied and collected in separate electrodes spaced along the length of the second dyode.

  9. Targets

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Targets NIF's millimeter-sized targets are complicated, precision assemblies that require a complex interplay among target designers, materials scientists, and precision engineers and technicians. NIF's targets are designed and fabricated to meet precise specifications for density, concentricity, and surface smoothness. The extreme temperatures and pressures targets encounter during experiments make the results highly susceptible to any imperfections in fabrication. As a result, target

  10. LOADING MACHINE FOR REACTORS

    DOE Patents [OSTI]

    Simon, S.L.

    1959-07-01

    An apparatus is described for loading or charging slugs of fissionable material into a nuclear reactor. The apparatus of the invention is a "muzzle loading" type comprising a delivery tube or muzzle designed to be brought into alignment with any one of a plurality of fuel channels. The delivery tube is located within the pressure shell and it is also disposed within shielding barriers while the fuel cantridges or slugs are forced through the delivery tube by an externally driven flexible ram.

  11. Target

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    kinematics Coulex Target e.g. C Stopper e.g. Cu Beam X X * C Si-Det. Yale Plunger 120 Te at 300 MeV Plunger foils Si-Detector Compton-suppressed Clover detectors (8) 50%...

  12. Protective tubes for sodium heated water tubes

    DOE Patents [OSTI]

    Essebaggers, Jan

    1979-01-01

    A heat exchanger in which water tubes are heated by liquid sodium which minimizes the results of accidental contact between the water and the sodium caused by failure of one or more of the water tubes. A cylindrical protective tube envelopes each water tube and the sodium flows axially in the annular spaces between the protective tubes and the water tubes.

  13. LIQUID TARGET

    DOE Patents [OSTI]

    Martin, M.D.; Salsig, W.W. Jr.

    1959-01-13

    A liquid handling apparatus is presented for a liquid material which is to be irradiated. The apparatus consists essentially of a reservoir for the liquid, a target element, a drain tank and a drain lock chamber. The target is in the form of a looped tube, the upper end of which is adapted to be disposed in a beam of atomic particles. The lower end of the target tube is in communication with the liquid in the reservoir and a means is provided to continuously circulate the liquid material to be irradiated through the target tube. Means to heat the reservoir tank is provided in the event that a metal is to be used as the target material. The apparatus is provided with suitable valves and shielding to provide maximum safety in operation.

  14. Multiple tube premixing device

    DOE Patents [OSTI]

    Uhm, Jong Ho; Naidu, Balachandar; Ziminksy, Willy Steve; Kraemer, Gilbert Otto; Yilmaz, Ertan; Lacy, Benjamin; Stevenson, Christian; Felling, David

    2013-08-13

    The present application provides a premixer for a combustor. The premixer may include a fuel plenum with a number of fuel tubes and a burner tube with a number of air tubes. The fuel tubes extend about the air tubes.

  15. Multiple tube premixing device

    DOE Patents [OSTI]

    Uhm, Jong Ho; Varatharajan, Balachandar; Ziminsky, Willy Steve; Kraemer, Gilbert Otto; Yilmaz, Ertan; Lacy, Benjamin; Stevenson, Christian; Felling, David

    2012-12-11

    The present application provides a premixer for a combustor. The premixer may include a fuel plenum with a number of fuel tubes and a burner tube with a number of air tubes. The fuel tubes extend about the air tubes.

  16. Coiled tubing buckling implication in drilling and completing horizontal wells

    SciTech Connect (OSTI)

    Wu, J.; Juvkam-Wold, H.C.

    1995-03-01

    This paper discusses coiled tubing buckling and load transmission when drilling and completing horizontal wells. Comprehensive analyses and new equations are presented to predict buckling of coiled tubing, slack-off weight transmission, actual bit weight or packer load, and maximum horizontal length. Coiled tubing lock-up and yield due to buckling are also discussed. These equations can also be used for other coiled tubing operations, such as coiled tubing workover, coiled tubing well stimulation, and even for conventional joint-connected drill strings. Calculations based on the equations presented are also compared with the previous literature.

  17. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Brown, P.T.; Wimberly, R.D.

    1992-10-01

    Oil and gas wells that flow on initial completion eventually reach a condition of liquid loading that kills the wells. This results form declining reservoir pressure, decreased gas volume (velocity), increased water production and other factors that cause liquids to accumulate at the bottom of the well and exert back pressure on the formation. This restricts or in some cases prevents fluid entry into the wellbore form the formation. Flowing production can be restored or increased by reducing surface backpressure, well bore stimulation, pressure maintenance or by installing a string of smaller diameter tubing. This paper reports on installation (hanging off) of a concentric string of coiled tubing inside existing production tubing which is an economically viable, safe, convenient and effective alterative for returning some of these liquid loaded )logged-up) wells to flowing status.

  18. Electron tube

    DOE Patents [OSTI]

    Suyama, Motohiro; Fukasawa, Atsuhito; Arisaka, Katsushi; Wang, Hanguo

    2011-12-20

    An electron tube of the present invention includes: a vacuum vessel including a face plate portion made of synthetic silica and having a surface on which a photoelectric surface is provided, a stem portion arranged facing the photoelectric surface and made of synthetic silica, and a side tube portion having one end connected to the face plate portion and the other end connected to the stem portion and made of synthetic silica; a projection portion arranged in the vacuum vessel, extending from the stem portion toward the photoelectric surface, and made of synthetic silica; and an electron detector arranged on the projection portion, for detecting electrons from the photoelectric surface, and made of silicon.

  19. Downhole pulse tube refrigerators

    SciTech Connect (OSTI)

    Swift, G.; Gardner, D.

    1997-12-01

    This report summarizes a preliminary design study to explore the plausibility of using pulse tube refrigeration to cool instruments in a hot down-hole environment. The original motivation was to maintain Dave Reagor`s high-temperature superconducting electronics at 75 K, but the study has evolved to include three target design criteria: cooling at 30 C in a 300 C environment, cooling at 75 K in a 50 C environment, cooling at both 75 K and 30 C in a 250 C environment. These specific temperatures were chosen arbitrarily, as representative of what is possible. The primary goals are low cost, reliability, and small package diameter. Pulse-tube refrigeration is a rapidly growing sub-field of cryogenic refrigeration. The pulse tube refrigerator has recently become the simplest, cheapest, most rugged and reliable low-power cryocooler. The authors expect this technology will be applicable downhole because of the ratio of hot to cold temperatures (in absolute units, such as Kelvin) of interest in deep drilling is comparable to the ratios routinely achieved with cryogenic pulse-tube refrigerators.

  20. Conceptual optimization using genetic algorithms for tube in tube structures

    SciTech Connect (OSTI)

    Pârv, Bianca Roxana; Hulea, Radu; Mojolic, Cristian

    2015-03-10

    The purpose of this article is to optimize the tube in tube structural systems for tall buildings under the horizontal wind loads. It is well-known that the horizontal wind loads is the main criteria when choosing the structural system, the types and the dimensions of structural elements in the majority of tall buildings. Thus, the structural response of tall buildings under the horizontal wind loads will be analyzed for 40 story buildings and a total height of 120 meters; the horizontal dimensions will be 30m × 30m for the first two optimization problems and 15m × 15m for the third. The optimization problems will have the following as objective function the cross section area, as restrictions the displacement of the building< the admissible displacement (H/500), and as variables the cross section dimensions of the structural elements.

  1. Tube furnace

    DOE Patents [OSTI]

    Foster, Kenneth G.; Frohwein, Eugene J.; Taylor, Robert W.; Bowen, David W.

    1991-01-01

    A vermiculite insulated tube furnace is heated by a helically-wound resistance wire positioned within a helical groove on the surface of a ceramic cylinder, that in turn is surroundingly disposed about a doubly slotted stainless steel cylindrical liner. For uniform heating, the pitch of the helix is of shorter length over the two end portions of the ceramic cylinder. The furnace is of large volume, provides uniform temperature, offers an extremely precise programmed heating capability, features very rapid cool-down, and has a modest electrical power requirement.

  2. Device and method for shortening reactor process tubes

    DOE Patents [OSTI]

    Frantz, Charles E.; Alexander, William K.; Lander, Walter E. B.

    1980-01-01

    This disclosure describes a device and method for in situ shortening of nuclear reactor zirconium alloy process tubes which have grown as a result of radiation exposure. An upsetting technique is utilized which involves inductively heating a short band of a process tube with simultaneous application of an axial load sufficient to cause upsetting with an attendant decrease in length of the process tube.

  3. Device and method for shortening reactor process tubes

    DOE Patents [OSTI]

    Frantz, C.E.; Alexander, W.K.; Lander, W.E.B.

    A device and method are described for in situ shortening of nuclear reactor zirconium alloy process tubes which have grown as a result of radiation exposure. An upsetting technique is utilized which involves inductively heating a short band of a process tube with simultaneous application of an axial load sufficient to cause upsetting with an attendant decrease in length of the process tube.

  4. Tapered pulse tube for pulse tube refrigerators

    DOE Patents [OSTI]

    Swift, Gregory W.; Olson, Jeffrey R.

    1999-01-01

    Thermal insulation of the pulse tube in a pulse-tube refrigerator is maintained by optimally varying the radius of the pulse tube to suppress convective heat loss from mass flux streaming in the pulse tube. A simple cone with an optimum taper angle will often provide sufficient improvement. Alternatively, the pulse tube radius r as a function of axial position x can be shaped with r(x) such that streaming is optimally suppressed at each x.

  5. Tube-in-tube thermophotovoltaic generator

    DOE Patents [OSTI]

    Ashcroft, John; Campbell, Brian; DePoy, David

    1998-01-01

    A thermophotovoltaic device includes at least one thermal radiator tube, a cooling tube concentrically disposed within each thermal radiator tube and an array of thermophotovoltaic cells disposed on the exterior surface of the cooling tube. A shell having a first end and a second end surrounds the thermal radiator tube. Inner and outer tubesheets, each having an aperture corresponding to each cooling tube, are located at each end of the shell. The thermal radiator tube extends within the shell between the inner tubesheets. The cooling tube extends within the shell through the corresponding apertures of the two inner tubesheets to the corresponding apertures of the two outer tubesheets. A plurality of the thermal radiator tubes can be arranged in a staggered or an in-line configuration within the shell.

  6. Tube-in-tube thermophotovoltaic generator

    DOE Patents [OSTI]

    Ashcroft, J.; Campbell, B.; DePoy, D.

    1998-06-30

    A thermophotovoltaic device includes at least one thermal radiator tube, a cooling tube concentrically disposed within each thermal radiator tube and an array of thermophotovoltaic cells disposed on the exterior surface of the cooling tube. A shell having a first end and a second end surrounds the thermal radiator tube. Inner and outer tubesheets, each having an aperture corresponding to each cooling tube, are located at each end of the shell. The thermal radiator tube extends within the shell between the inner tubesheets. The cooling tube extends within the shell through the corresponding apertures of the two inner tubesheets to the corresponding apertures of the two outer tubesheets. A plurality of the thermal radiator tubes can be arranged in a staggered or an in-line configuration within the shell. 8 figs.

  7. Coiled tubing -- Operations and services

    SciTech Connect (OSTI)

    Sas-Jaworsky, A. II ); Blount, C.G. ); Tailby, R.J. )

    1993-06-01

    This paper reviews three industry authority's views on developments that will impact coiled tubing equipment and techniques for conventional land locations, Arctic and harsh offshore environments. Examples which are provided include the development of high-strength steels, composite pipe, integral lift devices, abrasive jet drilling, and extended reach drilling. It discusses the application of coiled tubing to well completion and maintenance, including the applications to plugged pipelines. The use of new steels and alloys help increase the corrosion resistance of the drilling stem along with greater load-bearing capacity. The economic advantages of coiled drilling versus jointed tubing drilling is somewhat more questionable as the cost for downhole motors and directional tools remain prohibitively high and borehole diameters remain small.

  8. Heat exchanger tube mounts

    DOE Patents [OSTI]

    Wolowodiuk, W.; Anelli, J.; Dawson, B.E.

    1974-01-01

    A heat exchanger in which tubes are secured to a tube sheet by internal bore welding is described. The tubes may be moved into place in preparation for welding with comparatively little trouble. A number of segmented tube support plates are provided which allow a considerable portion of each of the tubes to be moved laterally after the end thereof has been positioned in preparation for internal bore welding to the tube sheet. (auth)

  9. Coiled tubing velocity strings keep wells unloaded

    SciTech Connect (OSTI)

    Wesson, H.R.; Shursen, J.L.

    1989-07-01

    Liquid loading is a problem in many older and even some newer gas wells, particularly in pressure depletion type reservoirs. This liquid loading results in decreased production and may even kill the well. The use of coiled tubing as a velocity string (or siphon string) has proved to be an economically viable alternative to allow continued and thus, increased cumulative production for wells experiencing liquid loading problems. Coiled tubing run inside the existing production string reduces the flow area, whether the well is produced up the tubing or up the annulus. This reduction in flow area results in an increase in flow velocity and thus, an increase in the well's ability to unload fluids.

  10. Plasma sputtering robotic device for in-situ thick coatings of long, small diameter vacuum tubes

    SciTech Connect (OSTI)

    Hershcovitch, A. Blaskiewicz, M.; Brennan, J. M.; Fischer, W.; Liaw, C.-J.; Meng, W.; Todd, R.; Custer, A.; Dingus, A.; Erickson, M.; Jamshidi, N.; Laping, R.; Poole, H. J.

    2015-05-15

    A novel robotic plasma magnetron mole with a 50?cm long cathode was designed, fabricated, and operated. The reason for this endeavor is to alleviate the problems of unacceptable resistive heating of stainless steel vacuum tubes in the BNL Relativistic Heavy Ion Collider (RHIC). The magnetron mole was successfully operated to copper coat an assembly containing a full-size, stainless steel, cold bore, RHIC magnet tubing connected to two types of RHIC bellows, to which two additional pipes made of RHIC tubing were connected. To increase the cathode lifetime, a movable magnet package was developed, and the thickest possible cathode was made, with a rather challenging target to substrate (de facto anode) distance of less than 1.5?cm. Achieving reliable steady state magnetron discharges at such a short cathode to anode gap was rather challenging, when compared to commercial coating equipment, where the target to substrate distance is 10's cm; 6.3?cm is the lowest experimental target to substrate distance found in the literature. Additionally, the magnetron developed during this project provides unique omni-directional uniform coating. The magnetron is mounted on a carriage with spring loaded wheels that successfully crossed bellows and adjusted for variations in vacuum tube diameter, while keeping the magnetron centered. Electrical power and cooling water were fed through a cable bundle. The umbilical cabling system is driven by a motorized spool. Excellent coating adhesion was achieved. Measurements indicated that well-scrubbed copper coating reduced secondary electron yield to 1, i.e., the problem of electron clouds can be eliminated. Room temperature RF resistivity measurement indicated that a 10??m copper coated stainless steel RHIC tube has a conductivity close to that of pure copper tubing. Excellent coating adhesion was achieved. The device details and experimental results are described.

  11. Collapse tests expand coiled tubing uses

    SciTech Connect (OSTI)

    Walker, E.J.; Mason, C.M. )

    1990-03-05

    Tests on coiled tubing have allowed the authors' company to decrease well work costs for some operations, especially squeeze cementing. They conducted collapse tests of 1.5 in. (0.095 in. and 0.109-in. wall thickness) and 1.75-in. (0.109-in. wall thickness) OD coiled tubing while under imposed axial load and differential pressure. These tests were performed to define accurate field operating limits for this size of coiled tubing. Findings from these tests are reported and discussed.

  12. End Calorimeter Warm Tube Heater

    SciTech Connect (OSTI)

    Primdahl, K.; /Fermilab

    1991-08-06

    The Tevatron accelerator beam tube must pass through the End Calorimeter cryostats of the D-Zero Collider Detector. Furthermore, the End Calorimeter cryostats must be allowed to roll back forty inches without interruption of the vacuum system; hence, the Tev tube must slide through the End Calorimeter cryostat as it is rolled back. The Tev pass through the End Calorimeter can actually be thought of as a cluster of concentric tubes: Tev tube, warm (vacuum vessel) tube, IS layers of superinsulation, cold tube (argon vessel), and Inner Hadronic center support tube. M. Foley generated an ANSYS model to study the heat load. to the cryostat. during collider physics studies; that is, without operation of the heater. A sketch of the model is included in the appendix. The vacuum space and superinsulation was modeled as a thermal solid, with conductivity derived from tests performed at Fermilab. An additional estimate was done. by this author, using data supplied by NR-2. a superinsulation manufacturer. The ANSYS result and hand calculation are in close agreement. The ANSYS model was modified. by this author. to incorporate the effect of the heater. Whereas the earlier model studied steady state operation only. the revised model considers the heater-off steady state mode as the initial condition. then performs a transient analysis with a final load step for time tending towards infinity. Results show the thermal gradient as a function of time and applied voltage. It should be noted that M. Foley's model was generated for one half the warm tube. implying the tube to be symmetric. In reality. the downstream connection (relative to the collision point) attachment to the vacuum shell is via several convolutions of a 0.020-inch wall bellows; hence. a nearly adiabatic boundary condition. Accordingly. the results reported in the table reflect extrapolation of the curves to the downstream end of the tube. Using results from the ANSYS analysis, that is, tube temperature and corresponding heat flux, temperature of the nichrome wire can be estimated. The possibility of frost is of genuine concern, as evidenced by the 250 K minimum temperature for the warm tube while heaters are not operating. Noting that steady state operation at 1 Amp (40 volts) allows the nichrome wire to stay below the critical temperature for Kapton, a conservative plan is to allow several days of heater operation, at 1 Amp (40 volts), before roll-back. Warm-up can be accelerated by operating the heaters in excess of 1 Amp, as evidenced by the test where a maximum of 3.2 Amp was supplied. Operating the heaters in excess of 1 Amp must be done with care since a rapid rise in temperature will likely occur once any ice present has been melted.

  13. Coiled tubing technology advances to a bright future

    SciTech Connect (OSTI)

    Ghiselin, R.

    1998-07-01

    This supplement contains six short articles on coiled tubing, its advantages, performance, and materials. The articles are: Coiled Tubing--On the Brink of a New Millennium; CT Advances Promise a Broad, Dynamic Future; Performance, Safety and Cost Make the Case for HPCT; Fast and Accurate, CTD Helps Drillers Hit Their Targets; Composite Tubing Rapidly Proves Advantages in the Field; and People and Performance are Key to Coiled Tubing Growth.

  14. Load cell

    DOE Patents [OSTI]

    Spletzer, Barry L.

    2001-01-01

    A load cell combines the outputs of a plurality of strain gauges to measure components of an applied load. Combination of strain gauge outputs allows measurement of any of six load components without requiring complex machining or mechanical linkages to isolate load components. An example six axis load cell produces six independent analog outputs which can be combined to determine any one of the six general load components.

  15. Load cell

    DOE Patents [OSTI]

    Spletzer, Barry L.

    1998-01-01

    A load cell combines the outputs of a plurality of strain gauges to measure components of an applied load. Combination of strain gauge outputs allows measurement of any of six load components without requiring complex machining or mechanical linkages to isolate load components. An example six axis load cell produces six independent analog outputs, each directly proportional to one of the six general load components.

  16. Load cell

    DOE Patents [OSTI]

    Spletzer, B.L.

    1998-12-15

    A load cell combines the outputs of a plurality of strain gauges to measure components of an applied load. Combination of strain gauge outputs allows measurement of any of six load components without requiring complex machining or mechanical linkages to isolate load components. An example six axis load cell produces six independent analog outputs, each directly proportional to one of the six general load components. 16 figs.

  17. Process development for cladding APT tungsten targets

    SciTech Connect (OSTI)

    Horner, M H; Barber, R; Dalder, E

    2000-11-27

    This report describes development of processes for cladding APT Target tungsten components with a thin layer (0.127-mm) of Alloy 718, Alloy 600 or 316L stainless steel alloy. The application requires that the cladding be thermally bonded to the tungsten in order to transfer heat generated in the tungsten volume to a surrounding coolant. High temperature diffusion bonding using the hot isostatic processing (HIP) technique was selected as the method for creating a metallurgical bond between pure tungsten tubes and rods and the cladding materials. Bonding studies using a uniaxially loaded vacuum hot press were conducted in preliminary experiments to determine acceptable time-temperature conditions for diffusion bonding. The results were successfully applied in cladding tungsten rods and tubes with these alloys. Temperatures 800-810 C were suitable for cladding tungsten with Alloy 600 and 316L stainless steel alloy, whereas tungsten was clad with Alloy 718 at 1020 C.

  18. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Sas-Jaworsky, A. )

    1993-01-01

    Coiled tubing can be used to wash or spot acid across completion intervals in vertical and high-angle wells. This technique allows easy wellbore cleanout, fluid placement flexibility and convenient flowback, and reduces damage from tubular deposits. Better zone coverage and rapid load recovery can improve well productivity. Oil and gas completions are intended to provide for efficient fluid transfer from permeable zones. When fluid inflow is less than optimum, the blockage or restriction is called 'formation damage,' and production or injection can be significantly affected. Damage mitigation treatments range form simple acid soaks to massive hydraulic fracturing, depending on damage type and severity. This article covers planning, designing and implementing treatments using coiled tubing.

  19. Microhole Tubing Bending Report

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Oglesby, Ken

    2012-01-01

    A downhole tubing bending study was made and is reported herein. IT contains a report and 2 excel spreadsheets to calculate tubing bending and to estimate contact points of the tubing to the drilled hole wall (creating a new support point).

  20. Microhole Tubing Bending Report

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Oglesby, Ken

    A downhole tubing bending study was made and is reported herein. IT contains a report and 2 excel spreadsheets to calculate tubing bending and to estimate contact points of the tubing to the drilled hole wall (creating a new support point).

  1. Ion Beam Analysis of Targets Used in Controlatron Neutron Generators

    SciTech Connect (OSTI)

    Banks, James C.; Doyle, Barney L.; Walla, Lisa A.; Walsh, David S.

    2009-03-10

    Controlatron neutron generators are used for testing neutron detection systems at Sandia National Laboratories. To provide for increased tube lifetimes for the moderate neutron flux output of these generators, metal hydride (ZrT{sub 2}) target fabrication processes have been developed. To provide for manufacturing quality control of these targets, ion beam analysis techniques are used to determine film composition. The load ratios (i.e. T/Zr concentration ratios) of ZrT{sub 2} Controlatron neutron generator targets have been successfully measured by simultaneously acquiring RBS and ERD data using a He{sup ++} beam energy of 10 MeV. Several targets were measured and the film thicknesses obtained from RBS measurements agreed within {+-}2% with Dektak profilometer measurements. The target fabrication process and ion beam analysis techniques will be presented.

  2. REACTOR COOLANT TUBE SEAL

    DOE Patents [OSTI]

    Morris, W.J.

    1958-12-01

    A plle-flattenlng control element and a fluid seal therefore to permit movement of the element into a liquld contnining region of a neutronlc reactor are described. The device consists of flattened, thin-walled aluminum tubing contalnlng a uniform mixture of thermal neutron absorbing material, and a number of soft rubber closures for the process tubes, having silts capable of passing the flattened elements therethrough, but effectively sealing the process tubes against fluld leaknge by compression of the rubber. The flattened tubing is sufficiently flexible to enable it to conform to the configuratlon of the annular spacing surrounding the fuel elements ln the process tubes.

  3. COAXIAL TUBE COUPLING

    DOE Patents [OSTI]

    Niemoth, H.R.

    1963-02-26

    BS>This patent shows a device for quickly coupling coaxial tubes in metal-to-metal fashion, so as to be suitable for use in a nuclear reactor. A threaded coliar urges a tapered metal extension on the outer coaxial tube into a tapered seat in the device and simultaneously exerts pressure through a coaxial helical spring so that a similar extension on the inner tube seats in a similar seat near the other end. (AEC)

  4. Conduction cooled tube supports

    DOE Patents [OSTI]

    Worley, Arthur C.; Becht, IV, Charles

    1984-01-01

    In boilers, process tubes are suspended by means of support studs that are in thermal contact with and attached to the metal roof casing of the boiler and the upper bend portions of the process tubes. The support studs are sufficiently short that when the boiler is in use, the support studs are cooled by conduction of heat to the process tubes and the roof casing thereby maintaining the temperature of the stud so that it does not exceed 1400.degree. F.

  5. Wound tube heat exchanger

    DOE Patents [OSTI]

    Ecker, Amir L.

    1983-01-01

    What is disclosed is a wound tube heat exchanger in which a plurality of tubes having flattened areas are held contiguous adjacent flattened areas of tubes by a plurality of windings to give a double walled heat exchanger. The plurality of windings serve as a plurality of effective force vectors holding the conduits contiguous heat conducting walls of another conduit and result in highly efficient heat transfer. The resulting heat exchange bundle is economical and can be coiled into the desired shape. Also disclosed are specific embodiments such as the one in which the tubes are expanded against their windings after being coiled to insure highly efficient heat transfer.

  6. Sapphire tube pressure vessel

    DOE Patents [OSTI]

    Outwater, John O. (Cambridge, MA)

    2000-01-01

    A pressure vessel is provided for observing corrosive fluids at high temperatures and pressures. A transparent Teflon bag contains the corrosive fluid and provides an inert barrier. The Teflon bag is placed within a sapphire tube, which forms a pressure boundary. The tube is received within a pipe including a viewing window. The combination of the Teflon bag, sapphire tube and pipe provides a strong and inert pressure vessel. In an alternative embodiment, tie rods connect together compression fittings at opposite ends of the sapphire tube.

  7. Coiled Tubing Safety Manual

    SciTech Connect (OSTI)

    Crow, W.

    1999-04-06

    This document addresses safety concerns regarding the use of coiled tubing as it pertains to the preservation of personnel, environment and the wellbore.

  8. Steam generator tube failures

    SciTech Connect (OSTI)

    MacDonald, P.E.; Shah, V.N.; Ward, L.W.; Ellison, P.G.

    1996-04-01

    A review and summary of the available information on steam generator tubing failures and the impact of these failures on plant safety is presented. The following topics are covered: pressurized water reactor (PWR), Canadian deuterium uranium (CANDU) reactor, and Russian water moderated, water cooled energy reactor (VVER) steam generator degradation, PWR steam generator tube ruptures, the thermal-hydraulic response of a PWR plant with a faulted steam generator, the risk significance of steam generator tube rupture accidents, tubing inspection requirements and fitness-for-service criteria in various countries, and defect detection reliability and sizing accuracy. A significant number of steam generator tubes are defective and are removed from service or repaired each year. This wide spread damage has been caused by many diverse degradation mechanisms, some of which are difficult to detect and predict. In addition, spontaneous tube ruptures have occurred at the rate of about one every 2 years over the last 20 years, and incipient tube ruptures (tube failures usually identified with leak detection monitors just before rupture) have been occurring at the rate of about one per year. These ruptures have caused complex plant transients which have not always been easy for the reactor operators to control. Our analysis shows that if more than 15 tubes rupture during a main steam line break, the system response could lead to core melting. Although spontaneous and induced steam generator tube ruptures are small contributors to the total core damage frequency calculated in probabilistic risk assessments, they are risk significant because the radionuclides are likely to bypass the reactor containment building. The frequency of steam generator tube ruptures can be significantly reduced through appropriate and timely inspections and repairs or removal from service.

  9. Novel Tube-in-Tube System Simplifies Subsurface Fluid Sampling...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Industrial Technologies Geothermal Geothermal Find More Like This Return to Search Novel Tube-in-Tube System Simplifies Subsurface Fluid Sampling Lawrence Berkeley National...

  10. High voltage load resistor array

    DOE Patents [OSTI]

    Lehmann, Monty Ray

    2005-01-18

    A high voltage resistor comprising an array of a plurality of parallel electrically connected resistor elements each containing a resistive solution, attached at each end thereof to an end plate, and about the circumference of each of the end plates, a corona reduction ring. Each of the resistor elements comprises an insulating tube having an electrode inserted into each end thereof and held in position by one or more hose clamps about the outer periphery of the insulating tube. According to a preferred embodiment, the electrode is fabricated from stainless steel and has a mushroom shape at one end, that inserted into the tube, and a flat end for engagement with the end plates that provides connection of the resistor array and with a load.

  11. Coiled tubing apparatus

    SciTech Connect (OSTI)

    Baugh, B.F.

    1981-05-05

    Disclosed are coiled tubing apparatus for operating on wells. A tubing injector head is supported on a mast and is moveable to selected elevations along the mast. The mast includes a lower section maintained in upright orientation, and an upper section which is pivotally joined to the lower section. The injector head may be lowered below the pivot point and the mast folded for transportation purposes. A chain drive maneuvers the injector head in one horizontal direction, and a fluid pressure cylinder maneuvers the injector head in a second horizontal direction generally orthogonal to the first. The chain drive is fitted with a worm gear coupling to positively lock the injector head in position. A height-adjustable level wind tubing guide directs the tubing onto or off of a reel. The base of the apparatus is fitted with a track along which a blowout preventer may be moved for subsequent positioning over a well.

  12. Load Participation in Ancillary Services Workshop Report

    SciTech Connect (OSTI)

    Kirby, Brendan; O'Malley, Mark; Ma, Ookie; Cappers, Peter; Corbus, Dave; Kiliccote, Sila; Onar, Omer; Starke, Michael; Steinberg, Dan

    2011-10-25

    Developing load participation in ancillary services to the electric grid. Challenges: coordination among multiple entities, targeted R&D for market conditions and regulatory and policy environments.

  13. Helically coiled tube heat exchanger

    SciTech Connect (OSTI)

    Harris, A.M.

    1981-08-18

    In a heat exchanger such as a steam generator for a nuclear reactor, two or more bundles of helically coiled tubes are arranged in series with the tubes in each bundle integrally continuing through the tube bundles arranged in series therewith. Pitch values for the tubing in any pair of tube bundles, taken transverse to the path of the reactor coolant flow about the tubes, are selected as a ratio of two unequal integers to permit efficient operation of each tube bundle while maintaining the various tube bundles of the heat exchanger within a compact envelope. Preferably, the helix angle and tube pitch parallel to the path of coolant flow are constant for all tubes in a single bundle so that the tubes are of approximately the same length within each bundle.

  14. Coiled tubing operations and services

    SciTech Connect (OSTI)

    Jaworsky, A.S. II )

    1991-11-01

    Coiled tubing offers many advantages over conventional jointed tubing used for drilling in oil fields, including time savings, pumping flexibility, fluid placement, reduced formation damage and safety. The article gives an overview of coiled tubing history and development. Operating concepts are explained, along with descriptions of the major equipment and components associated with coiled tubing use in the oil field today.

  15. California Customer Load Reductions during the Electricity Crisis...

    Open Energy Info (EERE)

    URI: cleanenergysolutions.orgcontentcalifornia-customer-load-reductions-d Language: English Policies: Regulations Regulations: MandatesTargets This report details the...

  16. Coiled tubing working life prediction

    SciTech Connect (OSTI)

    Wu, J.

    1995-12-31

    Failure of coiled tubing, due to the repeated bending and plastic deformation of coiled tubing on and off the reel and gooseneck, is of great concern in coiled tubing operations. This paper discusses the coiled tubing working life based on one of the coiled tubing life models published in the literature, and compares the results with other models. Certain agreements are found among these models. A group of curves is presented to illustrate the coiled tubing working life affected by coiled tubing size and wall thickness, internal pressure, yield strength, reel diameter, gooseneck radius, operation condition (corrosion) and butt-welded connection (stress concentration). The results show that coiled tubing life can be greatly increased by increasing CT wall thickness and CT strength, while the coiled tubing working life decreases under high internal pressure, corrosion, and butt-weld conditions. These curves can be easily used in estimating coiled tubing life for the field use.

  17. LOADING DEVICE

    DOE Patents [OSTI]

    Ohlinger, L.A.

    1958-10-01

    A device is presented for loading or charging bodies of fissionable material into a reactor. This device consists of a car, mounted on tracks, into which the fissionable materials may be placed at a remote area, transported to the reactor, and inserted without danger to the operating personnel. The car has mounted on it a heavily shielded magazine for holding a number of the radioactive bodies. The magazine is of a U-shaped configuration and is inclined to the horizontal plane, with a cap covering the elevated open end, and a remotely operated plunger at the lower, closed end. After the fissionable bodies are loaded in the magazine and transported to the reactor, the plunger inserts the body at the lower end of the magazine into the reactor, then is withdrawn, thereby allowing gravity to roll the remaining bodies into position for successive loading in a similar manner.

  18. Fluorescent Tube Lamps

    Broader source: Energy.gov [DOE]

    FEMP temporarily suspended its energy efficiency requirements for fluorescent tube lamps as it evaluates the market impact of the pending 2012 minimum efficiency standards for fluorescent lamps. The program will issue updated energy efficiency requirements when the market distribution of this product category stabilizes and when doing so has the potential to result in significant Federal energy savings.

  19. Advanced composites enhance coiled tubing capabilities

    SciTech Connect (OSTI)

    Sas-Jaworsky, A.; Williams, J.G.

    1994-04-01

    From early coiled tubing (CT) use to recent operations, most concerns have been about tube damage from past service and remaining safe working life. Composite CT (CCT) is designed and constructed to exhibit unique anisotropic characteristics relative to steel or alternative isotropic materials that expand burst, collapse, tensile and compressive load performance capabilities. In 1988, Conoco Inc. began a development effort focused on using high-performance composite materials to meet numerous challenges associated with current and future oil and gas exploration and development. At that time, Conoco initiated a project to explore composite materials use for high-pressure, long-length, non-corroding tubulars with primary application as onshore water injection lines. In 1989, Conoco awarded a contract to AMAT a/s in Sandefjord, Norway to develop spoolable composite pipe for small diameter subsea lines. Concurrent with ongoing spoolable composite subsea lines, Conoco also began to explore high-performance CCT development in 1989.

  20. LOADED WAVEGUIDES

    DOE Patents [OSTI]

    Mullett, L.B.; Loach, B.G.; Adams, G.L.

    1958-06-24

    >Loaded waveguides are described for the propagation of electromagnetic waves with reduced phase velocities. A rectangular waveguide is dimensioned so as to cut-off the simple H/sub 01/ mode at the operating frequency. The waveguide is capacitance loaded, so as to reduce the phase velocity of the transmitted wave, by connecting an electrical conductor between directly opposite points in the major median plane on the narrower pair of waveguide walls. This conductor may take a corrugated shape or be an aperature member, the important factor being that the electrical length of the conductor is greater than one-half wavelength at the operating frequency. Prepared for the Second U.N. International ConferThe importance of nuclear standards is duscussed. A brief review of the international callaboration in this field is given. The proposal is made to let the International Organization for Standardization (ISO) coordinate the efforts from other groups. (W.D.M.)

  1. Loading and conjugating cavity biostructures

    DOE Patents [OSTI]

    Hainfeld, J.F.

    1997-11-25

    Methods for the preparation and use of a biological delivery system are disclosed. The method of preparation includes the loading of a non-biological material into a biostructure having a load-bearing structure. The method also includes the removal of some of the biostructure`s contents and the loading of a non-biological material into the biostructure. The biostructure is biologically compatible with the host, and preferably is derived from the host, the host`s species or a related species. The loaded biostructure is used directly, or it can be targeted to specific cells, tissues and/or organs within a host. The targeted biostructure can be used to deliver the non-biological material to a specified tissue, organ or cell within a host for diagnostic, therapeutic or other purposes. 11 figs.

  2. Loading and conjugating cavity biostructures

    DOE Patents [OSTI]

    Hainfeld, James F.

    1995-08-22

    Methods for the preparation and use of a biological delivery system are disclosed. The method of preparation includes the loading of a non-biological material into a biostructure having a load-bearing structure. The method also includes the removal of some of the biostructure's contents and the loading of a non-biological material into the biostructure. The biostructure is biologically compatible with the host, and preferably is derived from the host, the host's species or a related species. The loaded biostructure is used directly, or it can be targeted to specific cells, tissues and/or organs within a host. The targeted biostructure can be used to deliver the non-biological material to a specified tissue, organ or cell within a host for diagnostic, therapeutic or other purposes.

  3. Loading and conjugating cavity biostructures

    DOE Patents [OSTI]

    Hainfeld, James F.

    1997-11-25

    Methods for the preparation and use of a biological delivery system are disclosed. The method of preparation includes the loading of a non-biological material into a biostructure having a load-bearing structure. The method also includes the removal of some of the biostructure's contents and the loading of a non-biological material into the biostructure. The biostructure is biologically compatible with the host, and preferably is derived from the host, the host's species or a related species. The loaded biostructure is used directly, or it can be targeted to specific cells, tissues and/or organs within a host. The targeted biostructure can be used to deliver the non-biological material to a specified tissue, organ or cell within a host for diagnostic, therapeutic or other purposes.

  4. Loading and conjugating cavity biostructures

    DOE Patents [OSTI]

    Hainfeld, J.F.

    1995-08-22

    Methods for the preparation and use of a biological delivery system are disclosed. The method of preparation includes the loading of a non-biological material into a biostructure having a load-bearing structure. The method also includes the removal of some of the biostructure`s contents and the loading of a non-biological material into the biostructure. The biostructure is biologically compatible with the host, and preferably is derived from the host, the host`s species or a related species. The loaded biostructure is used directly, or it can be targeted to specific cells, tissues and/or organs within a host. The targeted biostructure can be used to deliver the non-biological material to a specified tissue, organ or cell within a host for diagnostic, therapeutic or other purposes. 11 figs.

  5. Collapse pressure of coiled tubing

    SciTech Connect (OSTI)

    Yang, Y.S.

    1996-09-01

    The collapse pressure is a measure of an external force required to collapse a tube in the absence of internal pressure. It is defined as the minimum pressure required to yield the tube in the absence of internal pressure. Coiled tubing is sometimes used in high-pressure wells. If the external pressure becomes too high, the coiled tubing will collapse. This could not only lead to serious well-control problems, but may result in extensive fishing operations. A reliable safety criterion of collapse pressure for the coiled tubing is needed by the coiled tubing operators. Theoretical models of collapse pressure are well developed for perfectly round coiled tubing but not for oval coiled tubing. Coiled tubing is initially manufactured with nearly perfect roundness, sometimes having a small ovality (typically {le} 0.5%). Perfectly round CT becomes oval owing to the plastic mechanical deformation of the coiled tubing as it spooled on and off the reel and over the gooseneck. As the cycling continues, the ovality usually increases. This ovality significantly decreases the collapse failure pressure as compared to perfectly round tubing. In this paper, an analytical model of collapse pressure for oval tubing under axial tension or compression is developed based on elastic instability theory and the von Mises criterion. The theoretical model shows satisfactory agreement with experimental data.

  6. Induction plasma tube

    DOE Patents [OSTI]

    Hull, D.E.

    1982-07-02

    An induction plasma tube having a segmented, fluid-cooled internal radiation shield is disclosed. The individual segments are thick in cross-section such that the shield occupies a substantial fraction of the internal volume of the plasma enclosure, resulting in improved performance and higher sustainable plasma temperatures. The individual segments of the shield are preferably cooled by means of a counterflow fluid cooling system wherein each segment includes a central bore and a fluid supply tube extending into the bore. The counterflow cooling system results in improved cooling of the individual segments and also permits use of relatively larger shield segments which permit improved electromagnetic coupling between the induction coil and a plasma located inside the shield. Four embodiments of the invention, each having particular advantages, are disclosed.

  7. Induction plasma tube

    DOE Patents [OSTI]

    Hull, Donald E. (Los Alamos, NM)

    1984-01-01

    An induction plasma tube having a segmented, fluid-cooled internal radiation shield is disclosed. The individual segments are thick in cross-section such that the shield occupies a substantial fraction of the internal volume of the plasma enclosure, resulting in improved performance and higher sustainable plasma temperatures. The individual segments of the shield are preferably cooled by means of a counterflow fluid cooling system wherein each segment includes a central bore and a fluid supply tube extending into the bore. The counterflow cooling system results in improved cooling of the individual segments and also permits use of relatively larger shield segments which permit improved electromagnetic coupling between the induction coil and a plasma located inside the shield. Four embodiments of the invention, each having particular advantages, are disclosed.

  8. Joined concentric tubes

    DOE Patents [OSTI]

    DeJonghe, Lutgard; Jacobson, Craig; Tucker, Michael; Visco, Steven

    2013-01-01

    Tubular objects having two or more concentric layers that have different properties are joined to one another during their manufacture primarily by compressive and friction forces generated by shrinkage during sintering and possibly mechanical interlocking. It is not necessary for the concentric tubes to display adhesive-, chemical- or sinter-bonding to each other in order to achieve a strong bond. This facilitates joining of dissimilar materials, such as ceramics and metals.

  9. TUBE SHEARING VALVE

    DOE Patents [OSTI]

    Wilner, L.B.

    1960-05-24

    Explosive operated valves can be used to join two or more containers in fluid flow relationship, one such container being a sealed reservoir. The valve is most simply disposed by mounting it on the reservoir so thst a tube extends from the interior of the reservoir through the valve body, terminating at the bottom of the bore in a closed end; other containers may be similarly connected or may be open connected, as desired. The piston of the valve has a cutting edge at its lower end which shears off the closed tube ends and a recess above the cutting edge to provide a flow channel. Intermixing of the fluid being transferred with the explosion gases is prevented by a copper ring at the top of the piston which is force fitted into the bore at the beginning of the stroke. Although designed to avoid backing up of the piston at pressures up to 10,000 psi in the transferred fluid, proper operation is independent of piston position, once the tube ends were sheared.

  10. Concentric tube support assembly

    DOE Patents [OSTI]

    Rubio, Mark F.; Glessner, John C.

    2012-09-04

    An assembly (45) includes a plurality of separate pie-shaped segments (72) forming a disk (70) around a central region (48) for retaining a plurality of tubes (46) in a concentrically spaced apart configuration. Each segment includes a support member (94) radially extending along an upstream face (96) of the segment and a plurality of annularly curved support arms (98) transversely attached to the support member and radially spaced apart from one another away from the central region for receiving respective upstream end portions of the tubes in arc-shaped spaces (100) between the arms. Each segment also includes a radial passageway (102) formed in the support member for receiving a fluid segment portion (106) and a plurality of annular passageways (104) formed in the support arms for receiving respective arm portions (108) of the fluid segment portion from the radial passageway and for conducting the respective arm portions into corresponding annular spaces (47) formed between the tubes retained by the disk.

  11. Large-diameter coiled tubing completions decrease risk of formation damage

    SciTech Connect (OSTI)

    Norton, V. ); Edens, F. ); Coker, G. ); King, G. )

    1992-07-20

    Amoco Production Co. has used large-diameter coiled tubing strings to avoid damaging gas wells with kill fluids. The coiled tubing is stripped in the gas well under pressure. In Amoco's case, the gas flows up the tubing/casing annulus. The coiled tubing string provides a way to blow down the well whenever the well loads up with liquids from completion, workover, or naturally produced fluids. This paper reports that to date, Amoco has installed coiled tubing in four wells. The oldest has 18 months of service. Although some turbine longevity questions must be answered, the first four completions have proven fast and trouble free. The basic equipment for handling coil tubing is shown. The transport trailer and tubing injector head are similar to standard servicing equipment and not considered experimental. The production tubing reel is capable of carrying 14,000 ft of 2-in tubing or 18,000 ft of 1 3/4-in. tubing. For shallower wells, multiple tubing strings can be would on the same spool. Because of handling difficulties of large tubing, spools must be wound at the factory. Most of the largest sizes are made to order, making lead time a necessary consideration.

  12. HLW Glass Waste Loadings

    Office of Environmental Management (EM)

    HLW Glass Waste Loadings Ian L. Pegg Vitreous State Laboratory The Catholic University of ... (JHCM) technology Factors affecting waste loadings Waste loading requirements ...

  13. High voltage supply for neutron tubes in well logging applications

    DOE Patents [OSTI]

    Humphreys, D. Russell

    1989-01-01

    A high voltage supply is provided for a neutron tube used in well logging. The "biased pulse" supply of the invention combines DC and "full pulse" techniques and produces a target voltage comprising a substantial negative DC bias component on which is superimposed a pulse whose negative peak provides the desired negative voltage level for the neutron tube. The target voltage is preferably generated using voltage doubling techniques and employing a voltage source which generates bipolar pulse pairs having an amplitude corresponding to the DC bias level.

  14. Ion plated electronic tube device

    DOE Patents [OSTI]

    Meek, T.T.

    1983-10-18

    An electronic tube and associated circuitry which is produced by ion plating techniques. The process is carried out in an automated process whereby both active and passive devices are produced at very low cost. The circuitry is extremely reliable and is capable of functioning in both high radiation and high temperature environments. The size of the electronic tubes produced are more than an order of magnitude smaller than conventional electronic tubes.

  15. Method for producing a tube

    DOE Patents [OSTI]

    Peterson, Kenneth A.; Rohde, Steven B.; Pfeifer, Kent B.; Turner, Timothy S.

    2007-01-02

    A method is described for producing tubular substrates having parallel spaced concentric rings of electrical conductors that can be used as the drift tube of an Ion Mobility Spectrometer (IMS). The invention comprises providing electrodes on the inside of a tube that are electrically connected to the outside of the tube through conductors that extend between adjacent plies of substrate that are combined to form the tube. Tubular substrates are formed from flexible polymeric printed wiring board materials, ceramic materials and material compositions of glass and ceramic, commonly known as Low Temperature Co-Fired Ceramic (LTCC). The adjacent plies are sealed together around the electrode.

  16. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Welch, J.L.; Stephens, R.K. )

    1992-09-01

    This paper reports on coiled tubing units which are used for many types of remedial well operations, including sand plugbacks, cement squeezes, fill cleanouts, underreaming, acid stimulations, and fishing. Fishing operations include removal of inflatable bridge plugs, lock mandrels stuck in profile nipples, coiled tubing, coiled tubing bottomhole assemblies (BHAs) and wireline. Recommended guidelines for selecting candidates, proper tool string configuration and operational techniques are presented here to assist coiled tubing supervisors and company representatives in the planning and implementation of efficient and effective fishing operations. Treatment of these areas are not intended to be exhaustive, but rather generally representative of common applications. Each fishing operation requires individualized analysis and planning.

  17. Coiled tubing. operations and services

    SciTech Connect (OSTI)

    Hightower, C.M. )

    1992-11-01

    Coiled tubing is being used with increasing frequency in conventional or traditional production operations. Demand for coiled pipe in these types of applications is expected to experience rapid growth as standard 2 (3/8) and 2 (7/8)-in. OD tubing sizes and units equipped to run larger pipe become more readily available. This paper reports on a recent market survey which indicated that coiled tubing used for velocity strings and standard production tubing installations are two areas with the most potential for immediate and near-term expansion. Other applications include: well casing and liners, gravel packing, artificial lift, flowlines and pipelines.

  18. Reduced-vibration tube array

    DOE Patents [OSTI]

    Bruck, Gerald J.; Bartolomeo, Daniel R.

    2004-07-20

    A reduced-vibration tube array is disclosed. The array includes a plurality of tubes in a fixed arrangement and a plurality of damping members positioned within the tubes. The damping members include contoured interface regions characterized by bracing points that selectively contact the inner surface of an associated tube. Each interface region is sized and shaped in accordance with the associated tube, so that the damping member bracing points are spaced apart a vibration-reducing distance from the associated tube inner surfaces at equilibrium. During operation, mechanical interaction between the bracing points and the tube inner surfaces reduces vibration by a damage-reducing degree. In one embodiment, the interface regions are serpentine shaped. In another embodiment, the interface regions are helical in shape. The interface regions may be simultaneously helical and serpentine in shape. The damping members may be fixed within the associated tubes, and damping member may be customized several interference regions having attributes chosen in accordance with desired flow characteristics and associated tube properties.

  19. Why high-frequency pulse tubes can be tipped

    SciTech Connect (OSTI)

    Swift, Gregory W092710; Backhaus, Scott N

    2010-01-01

    The typical low-frequency pulse-tube refrigerator loses significant cooling power when it is tipped with the pulse tube's cold end above its hot end, because natural convection in the pulse tube loads the cold heat exchanger. Yet most high-frequency pulse-tube refrigerators work well in any orientation with respect to gravity. In such a refrigerator, natural convection is suppressed by sufficiently fast velocity oscil1ations, via a nonlinear hydrodynamic effect that tends to align the density gradients in the pulse tube parallel to the oscillation direction. Since gravity's tendency to cause convection is only linear in the pulse tube's end-to-end temperature difference while the oscillation's tendency to align density gradients with oscillating velocity is nonlinear, it is easiest to suppress convection when the end-to-end temperature difference is largest. Simple experiments demonstrate this temperature dependence, the strong dependence on the oscillating velocity, and little dependence on the magnitude or phase of the oscillating pressure. In some circumstances in this apparatus, the suppression of convection is a hysteretic function of oscillating velocity. In some other circumstances, a time-dependent convective state seems more difficult to suppress.

  20. Hydrogen Tube Trailers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Delivery » Gaseous Hydrogen » Hydrogen Tube Trailers Hydrogen Tube Trailers Trucks that haul gaseous hydrogen are called tube trailers. Gaseous hydrogen is compressed to pressures of 180 bar (~2,600 psig) or higher into long cylinders that are stacked on a trailer that the truck hauls. This gives the appearance of long tubes, hence the name tube trailer. Tube trailers are currently limited to pressures of 250 bar by U.S. Department of Transportation (DOT) regulations. Steel tube

  1. Equations determine coiled tubing collapse pressure

    SciTech Connect (OSTI)

    Avakov, V.; Taliaferro, W.

    1995-07-24

    A set of equations has been developed for calculating pipe collapse pressure for oval tubing such as coiled tubing. When coiled tubing is placed onto a reel, the tubing is forced into an oval shape and never again returns to perfect roundness because the coiling process exceeds the plasticity limits of the tubing. Straightening the tubing for the trip into the well does not restore roundness. The consequence of this physical property is that all coiled tubing collapse pressure calculations should be made considering oval tubing, not round tubing. Tubing collapse can occur when formation pressure against the coiled tubing exceeds the collapse resistance inherent in the coiled tubing. As coiled tubing becomes more oval in shape, it becomes more oval in shape, it becomes more susceptible to collapse from outside pressure.

  2. Coiled tubing - Operations and services

    SciTech Connect (OSTI)

    Gronseth, J.M. )

    1993-04-01

    Drilling with a continuous (rather than jointed) drill string is an old concept that is gaining new attention as a result of recent advances made in coiled tubing and drilling technology. The development of larger diameter, reliable, high-strength coiled tubing and smaller diameter, positive displacement motors, orienting tools, surveying systems and fixed cutting drill bits have given drilling with a continuous drill string a capability that was previously unattainable. Like its many other uses, (e.g., squeeze cementing, wellbore cleanouts, flow initiation, logging) the continuity of coiled tubing gives it several advantages over conventional drill strings. These include: drilling underbalanced safely, significantly reduced trip time, continuous circulation, smaller surface requirements. Coiled tubing drilling operations have smaller surface lease requirements than most conventional rigs due to the smaller footprint of the coiled tubing unit and associated equipment. Current coiled tubing drilling operations have the following limitations: conventional rig assistance is required for well preparation; conventional rigs must assist in running long protective and production casing strings or liners; hole sizes are smaller; working depth capabilities are shallower, coiled tubing life is less. This paper goes on to discuss the history of continuous drill strings and includes information on tubing units, circulating systems, drilling fluids, well control systems, downhole tools, orientation tools, and bottomhole assemblies. It then gives a cost comparison and an application of this type of drilling.

  3. Target Chamber

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Diagnostic ports are about one-half meter in diameter and are generally concentrated around the "waist" of the target chamber Target handling systems precisely position the target ...

  4. Widget:YouTube | Open Energy Information

    Open Energy Info (EERE)

    This widget displays a YouTube video. Parameters id - the YouTube video id (this is the v parameter or the code at the end of the YouTube url. width - the width of video...

  5. Eddy current signal comparison for tube identification

    SciTech Connect (OSTI)

    Glass, S. W. E-mail: Ratko.Vojvodic@areva.com; Vojvodic, R. E-mail: Ratko.Vojvodic@areva.com

    2015-03-31

    Inspection of nuclear power plant steam generator tubes is required to justify continued safe plant operation. The steam generators consist of thousands of tubes with nominal diameters of 15 to 22mm, approximately 1mm wall thickness, and 20 to 30m in length. The tubes are inspected by passing an eddy current probe through the tubes from tube end to tube end. It is critical to know exactly which tube identification (row and column) is associated with each tube's data. This is controlled by a precision manipulator that provides the tube ID to the eddy current system. Historically there have been some instances where the manipulator incorrectly reported the tube ID. This can have serious consequences including lack of inspection of a tube, or if a pluggable indication is detected, the tube is likely to be mis-plugged thereby risking a primary to secondary leak.

  6. Method of making straight fuel cell tubes

    DOE Patents [OSTI]

    Borglum, Brian P. (Edgewood, PA)

    2001-01-01

    A method and an apparatus for making straight fuel cell tubes are disclosed. Extruded tubes comprising powders of fuel cell material and a solvent are dried by rotating the extruded tubes. The rotation process provides uniform circumferential drying which results in uniform linear shrinkage of the tubes. The resultant dried tubes are very straight, thereby eliminating subsequent straightening steps required with conventional processes. The method is particularly useful for forming inner air electrode tubes of solid oxide fuel cells.

  7. Titanium vs. traditional coiled tubing

    SciTech Connect (OSTI)

    1997-06-01

    The development of composite and titanium pipe has the potential to eliminate many of the issues facing coiled-tubing (CT) work on platforms with restricted lift capability in the North Sea, such as the time to mobilize and set up the CT reel, additional personnel requirements, and weather dependence. A number of methods are available to overcome reel-weight limitations when conventional steel Ct is used. These include Ct welding, split reels, boat spooling, and tube/tube connectors. These factors are discussed then the paper discusses results from 3 field tests on gas and oil wells.

  8. Power Tube Inc | Open Energy Information

    Open Energy Info (EERE)

    Power Tube Inc Jump to: navigation, search Name: Power Tube Inc Place: Houston, Texas Zip: 77060 Sector: Geothermal energy Product: Texan geothermal systems developer. Has...

  9. Los Alamos National Laboratory W76 Pit Tube Lifetime Study

    SciTech Connect (OSTI)

    Abeln, Terri G.

    2012-04-25

    A metallurgical study was requested as part of the Los Alamos National Laboratory (LANL) W76-1 life-extension program (LEP) involving a lifetime analysis of type 304 stainless steel pit tubes subject to repeat bending loads during assembly and disassembly operations at BWXT/Pantex. This initial test phase was completed during the calendar years of 2004-2006 and the report not issued until additional recommended tests could be performed. These tests have not been funded to this date and therefore this report is considered final. Tubes were reportedly fabricated according to Rocky Flats specification P14548 - Seamless Type 304 VIM/VAR Stainless Steel Tubing. Tube diameter was specified as 0.125 inches and wall thickness as 0.028 inches. A heat treat condition is not specified and the hardness range specification can be characteristic of both 1/8 and 1/4 hard conditions. Properties of all tubes tested were within specification. Metallographic analysis could not conclusively determine a specified limit to number of bends allowable. A statistical analysis suggests a range of 5-7 bends with a 99.95% confidence limit. See the 'Statistical Analysis' section of this report. The initial phase of this study involved two separate sets of test specimens. The first group was part of an investigation originating in the ESA-GTS [now Gas Transfer Systems (W-7) Group]. After the bend cycle test parameters were chosen (all three required bends subjected to the same amount of bend cycles) and the tubes bent, the investigation was transferred to Terri Abeln (Metallurgical Science and Engineering) for analysis. Subsequently, another limited quantity of tubes became available for testing and were cycled with the same bending fixture, but with different test parameters determined by T. Abeln.

  10. Tube-wave seismic imaging

    DOE Patents [OSTI]

    Korneev, Valeri A.; Bakulin, Andrey

    2009-10-13

    The detailed analysis of cross well seismic data for a gas reservoir in Texas revealed two newly detected seismic wave effects, recorded approximately 2000 feet above the reservoir. A tube-wave (150) is initiated in a source well (110) by a source (111), travels in the source well (110), is coupled to a geological feature (140), propagates (151) through the geological feature (140), is coupled back to a tube-wave (152) at a receiver well (120), and is and received by receiver(s) (121) in either the same (110) or a different receiving well (120). The tube-wave has been shown to be extremely sensitive to changes in reservoir characteristics. Tube-waves appear to couple most effectively to reservoirs where the well casing is perforated, allowing direct fluid contact from the interior of a well case to the reservoir.

  11. Tube-wave seismic imaging

    DOE Patents [OSTI]

    Korneev, Valeri A [LaFayette, CA

    2009-05-05

    The detailed analysis of cross well seismic data for a gas reservoir in Texas revealed two newly detected seismic wave effects, recorded approximately 2000 feet above the reservoir. A tube-wave (150) is initiated in a source well (110) by a source (111), travels in the source well (110), is coupled to a geological feature (140), propagates (151) through the geological feature (140), is coupled back to a tube-wave (152) at a receiver well (120), and is and received by receiver(s) (121) in either the same (110) or a different receiving well (120). The tube-wave has been shown to be extremely sensitive to changes in reservoir characteristics. Tube-waves appear to couple most effectively to reservoirs where the well casing is perforated, allowing direct fluid contact from the interior of a well case to the reservoir.

  12. Vertical tube liquid pollutant separators

    SciTech Connect (OSTI)

    Lynch, W.M.

    1982-06-08

    A plurality of elongated hollow, circular, foraminous substantially vertical tubes contiguously stacked transversely to the direction flowing liquid such as waste water containing foreign matter, I.E., settable solids and free oil, in a coalescer-separator apparatus provide a filter body providing for significant surface area contact by the liquid on both inside and outside surfaces of the tubes to entrap the foreign matter but defining substantially vertical passages permitting the entrapped foreign matter to be gravity separated with the lighter matter coalescing and floating upwardly and the heavier matter settling downwardly so that substantially clarified effluent flows from the apparatus. The stacked tube filter body is contained within an insulated closed container of a sufficient capacity, and the arrays of holes in the tube walls are coordinated with respect to the intended volumetric capacity of the apparatus, so that turbulence in the liquid flowing through the filter body is minimized.

  13. Photomultiplier tube gain regulating system

    DOE Patents [OSTI]

    Johnson, Wayne F.

    1976-01-01

    This invention relates to an improved system for regulating the gain of a photomultiplier tube, and was designed for use with the photomultiplier tubes of a GeMSAEC fast analyzers. It has the following advantages over the prior system: noise is virtually eliminated; sample analysis can begin after 3 to 4 revolutions of the rotor; fluorescent and light scattering solutions can be used as a reference; and the reference solution can be in any cuvette on the rotor.

  14. Tube wall thickness measurement apparatus

    DOE Patents [OSTI]

    Lagasse, P.R.

    1985-06-21

    An apparatus for measuring the thickness of a tube's wall for the tube's entire length and radius by determining the deviation of the tube wall thickness from the known thickness of a selected standard item. The apparatus comprises a base and a first support member having first and second ends. The first end is connected to the base and the second end is connected to a spherical element. A second support member is connected to the base and spaced apart from the first support member. A positioning element is connected to and movable relative to the second support member. An indicator is connected to the positioning element and is movable to a location proximate the spherical element. The indicator includes a contact ball for first contacting the selected standard item and holding it against the spherical element. The contact ball then contacts the tube when the tube is disposed about the spherical element. The indicator includes a dial having a rotatable needle for indicating the deviation of the tube wall thickness from the thickness of the selected standard item.

  15. Tube wall thickness measurement apparatus

    DOE Patents [OSTI]

    Lagasse, Paul R.

    1987-01-01

    An apparatus for measuring the thickness of a tube's wall for the tube's entire length and circumference by determining the deviation of the tube wall thickness from the known thickness of a selected standard item. The apparatus comprises a base and a first support member having first and second ends. The first end is connected to the base and the second end is connected to a spherical element. A second support member is connected to the base and spaced apart from the first support member. A positioning element is connected to and movable relative to the second support member. An indicator is connected to the positioning element and is movable to a location proximate the spherical element. The indicator includes a contact ball for first contacting the selected standard item and holding it against the spherical element. The contact ball then contacts the tube when the tube is disposed about the spherical element. The indicator includes a dial having a rotatable needle for indicating the deviation of the tube wall thickness from the thickness of the selected standard item.

  16. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Welch, J.L. ); Whitlow, R.R. )

    1992-07-01

    This paper reports that pulling tubing to clean out a production liner at Prudhoe Bay Unit Western Operating Area (PBU WOA) averages $600,000 to $800,000. Coiled tubing underreaming was developed to accomplish this objective at lower costs. Beginning in 1988, these operations have been improved through several generations of procedures and tool designs. Using current technology, the underreamer, in conjunction with coiled tubing, can reduce the cost of drilling out to a liner to about $50,000 or $100,000, depending on the amount and type of material to be removed. PBU WOA, operated by BP Exploration, produces about 600,000 bopd from 395 wells. Another 61 wells are used to inject produced water, seawater and miscible fluids. Most of the remedial well servicing operations are conducted using coiled tubing (CT). Three contract coiled tubing units (CTUs) work daily, performing wellbore cleanouts, stimulations, inflatable bridge plug installations and cement squeeze operations. About 42 underreaming jobs were performed from 1990 to 1991 at PBU WOA for an average cost of between $75,000 and $100,000, a cost savings of $500,000 power well compared to pulling tubing and cleaning out the wells conventionally.

  17. Cladding material, tube including such cladding material and methods of forming the same

    DOE Patents [OSTI]

    Garnier, John E.; Griffith, George W.

    2016-03-01

    A multi-layered cladding material including a ceramic matrix composite and a metallic material, and a tube formed from the cladding material. The metallic material forms an inner liner of the tube and enables hermetic sealing of thereof. The metallic material at ends of the tube may be exposed and have an increased thickness enabling end cap welding. The metallic material may, optionally, be formed to infiltrate voids in the ceramic matrix composite, the ceramic matrix composite encapsulated by the metallic material. The ceramic matrix composite includes a fiber reinforcement and provides increased mechanical strength, stiffness, thermal shock resistance and high temperature load capacity to the metallic material of the inner liner. The tube may be used as a containment vessel for nuclear fuel used in a nuclear power plant or other reactor. Methods for forming the tube comprising the ceramic matrix composite and the metallic material are also disclosed.

  18. Defining coiled tubing limits -- A new approach

    SciTech Connect (OSTI)

    Newman, K.R.; Sathuvalli, U.B.; Stone, L.R.; Wolhart, S.

    1996-12-31

    The burst, collapse and axial load operating limits for Coiled Tubing (CT) are currently established using the Von Mises incipient yield criterion. This criterion has historically been used to calculate the limits for oil country tubular goods (OCTG). The limits according to this criterion are based on the point at which the pipe material reaches a load state in which it begins to yield. Because of the bending that occurs when the CT is spooled on and off the reel, and when it is bent over the guide arch, the CT is already far beyond the yield point before it enters a well. Thus, this criterion does not really apply to CT. This paper describes a research project currently in progress. The purpose of this project is to define a new set of CT limits based on criteria other than incipient yield. This new approach to setting CT operating limits takes into account the internal residual stresses in the CT which are a consequence of repeated bending cycles and the accompanying change in material properties.

  19. Coiled tubing - Operations and services

    SciTech Connect (OSTI)

    Rich, D.A.; Blue, T.H. )

    1993-03-01

    Sand production can severely impact well performance and profitability by damaging production equipment or plugging wellbores. Sand control in existing wells may be required because of inadequate initial completion design, recompletion to new intervals or changes in reservoir production characteristics. The most durable and reliable sand control is by conventional gravel packing, but in some cases, conventional packs may not be economic or feasible. Improvements in coiled tubing technology and reliability have resulted in better application and increased acceptance of through-tubing sand control. Concentric gravel packing and sand consolidation are being used more because of advances in equipment, services, downhole tools and fluids. Candidates for these techniques include conventional completions that begin producing sand and wells with gravel pack failures. Economical jobs have been performed successfully in several different wellbore configurations. Some initially non-gravel packed wells are now being designed for possible through-tubing gravel packing, anticipating sand production later in the completion's producing life. This paper reviews the general procedures for installing a through-tubing, washdown mechanical gravel pack using coiled tubing conveyance and placement techniques.

  20. Divertor target for magnetic containment device

    DOE Patents [OSTI]

    Luzzi, Jr., Theodore E.

    1982-01-01

    In a plasma containment device of a type having superconducting field coils for magnetically shaping the plasma into approximately the form of a torus, an improved divertor target for removing impurities from a "scrape off" region of the plasma comprises an array of water cooled swirl tubes onto which the scrape off flux is impinged. Impurities reflected from the divertor target are removed from the target region by a conventional vacuum getter system. The swirl tubes are oriented and spaced apart within the divertor region relative to the incident angle of the scrape off flux to cause only one side of each tube to be exposed to the flux to increase the burnout rating of the target. The divertor target plane is oriented relative to the plane of the path of the scrape off flux such that the maximum heat flux onto a swirl tube is less than the tube design flux. The containment device is used to contain the plasma of a tokamak fusion reactor and is applicable to other long pulse plasma containment systems.

  1. Inspecting coiled tubing for well operations

    SciTech Connect (OSTI)

    Gard, M.F.; Pasternack, E.S.; Smith, L.J.

    1992-02-18

    This patent describes improvement in a coiled tubing system for insertion of a substantially continuous bendable length of metal tubing into and withdrawal from a wellbore, the system including a tubing injection unit disposed for injecting the length of tubing into the well bore and storage means for dispensing the length of tubing and receiving the length of tubing from the injection unit. The improvement includes: tubing inspection apparatus for substantially continuously inspecting the wall section of the tubing to detect cracks and structural defects which may lead to tubing failure, the apparatus comprising: a source of electromagnetic radiation mounted in proximity to the tubing between the injection unit and a wellhead into which the tubing is injected; a radiation detector unit for receiving signals from the source which have been projected through the wall of the tubing; means for receiving signals form the detector unit for monitoring the structural integrity o the wall of the tubing during one of injecting and withdrawing the tubing with respect to the wellhead; and housing means supported for rotation about a longitudinal axis of the tubing.

  2. Method and apparatus for transferring and injecting rf energy from a generator to a resonant load

    DOE Patents [OSTI]

    Hoffert, William J.

    1987-01-01

    Improved apparatus and method are provided for the coherent amplification and injection of radio-frequency (rf) energy into a load cavity using a plurality of amplifier tubes. A plurality of strip line cavities (30, 32, 34, 36, 40, 42, 44) are laterally joined to define a continuous closed cavity (48), with an amplifier tube (50, 52, 54, 56, 58, 60, 62, 64) mounted within each resonant strip cavity. Rf energy is injected into the continuous cavity (48) from a single input (70) for coherent coupling to all of the amplifier tubes for amplification and injection into the load cavity (76).

  3. Opposed slant tube diabatic sorber

    DOE Patents [OSTI]

    Erickson, Donald C.

    2004-01-20

    A sorber comprised of at least three concentric coils of tubing contained in a shell with a flow path for liquid sorbent in one direction, a flow path for heat transfer fluid which is in counter-current heat exchange relationship with sorbent flow, a sorbate vapor port in communication with at least one of sorbent inlet or exit ports, wherein each coil is coiled in opposite direction to those coils adjoining it, whereby the opposed slant tube configuration is achieved, with structure for flow modification in the core space inside the innermost coil.

  4. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Sas-Jaworsky, A. II )

    1991-12-01

    This article outlines the minimum safety requirements that should be considered for onshore and offshore oil well service operations with coiled tubing equipment. These guidelines comply with Minerals Management Service (MMS) regulations issued on May 31, 1988, for offshore work. Where specific MMS regulations are sited, the regulation reference, Incident of Non-Compliance (INC), number is provided. These guidelines can be used by operators and contractors, and although U.S. offshore operations are emphasized, they are applicable wherever coiled tubing services are used.

  5. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Sas-Jaworsky, A. II )

    1992-03-01

    Operations involving sand or solids washing are the most common of today's coiled tubing workover services. Wellbore cleanouts require pumping fluid that will entrain solids and return them to the surface. In most cases, wash fluids and solids are captured in surface tanks of sufficient volume to allow solids to settle out. Where practical, fluids are recirculated to reduce cost. An important concern when designing sand wash programs is correct fluid system selection. Wash fluids should closely balance BHP and provide piston like displacement for solids removal. This paper is an overview of compressible and incompressible fluids commonly used for coiled tubing services.

  6. Novel techniques and devices for in-situ film coatings of long, small diameter tubes or elliptical and other surface contours

    SciTech Connect (OSTI)

    Hershcovitch, Ady; Blaskiewicz, Michael; Brennan, Joseph Michael; Fischer, Wolfram; Liaw, Chong -Jer; Meng, Wuzhang; Todd, Robert; Custer, Art; Dingus, Aaron; Erikson, Mark; Jamshidi, Nader; Poole, Henry Joe

    2015-07-30

    In this study, devices and techniques that can, via physical vapor deposition,coat various surface contours or very long small aperture pipes, are described. Recently, a magnetron mole was developed in order to in-situ coat accelerator tube sections of the Brookhaven National Lab relativistic heavy ion collider that have 7.1 cm diameter with access points that are 500 m apart, for copper coat the accelerator vacuum tube in order to alleviate the problems of unacceptable ohmic heating and of electron clouds. A magnetron with a 50 cm long cathode was designed fabricated and successfully operated to copper coat a whole assembly containing a full-size, stainless steel, cold bore, of the accelerator magnet tubing connected to two types bellows, to which two additional pipes made of accelerator tubing were connected. The magnetron is mounted on a carriage with spring loaded wheels that successfully crossed bellows and adjusted for variations in vacuum tube diameter, while keeping the magnetron centered. Electrical power and cooling water were fed through a cable bundle. The umbilical cabling system, which is enclosed in a flexible braided metal sleeve, is driven by a motorized spool. To increase cathode lifetime, movable magnet package was developed, and thickest possible cathode was made, with a rather challenging target to substrate distance of less than 1.5 cm. Optimized process to ensure excellent adhesion was developed. Coating thickness of 10 μm Cu passed all industrial tests and even exceeded maximum capability of a 12 kg pull test fixture. Room temperature radio frequency (RF) resistivity measurement indicated that 10 μm Cu coated stainless steel accelerator tube has conductivity close to copper tubing. Work is in progress to repeat the RF resistivity measurement at cryogenic temperatures. Over 20 years ago, a device using multi axis robotic manipulators controlling separate robotic assemblies resulted in nine-axes of motion combined with conformal shape of the cathodes that can adapt to various curved surface contours was developed and successfully used for depositing optical coating on aircraft canopies. The techniques can be utilized for in situ coating of elliptical and other surface contour RF cavities and long beam pipes with thick superconducting films. Plans are to incorporate ion assisted deposition in those techniques for attaining dense, adherent and defect free coatings.

  7. Novel techniques and devices for in-situ film coatings of long, small diameter tubes or elliptical and other surface contours

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hershcovitch, Ady; Blaskiewicz, Michael; Brennan, Joseph Michael; Fischer, Wolfram; Liaw, Chong -Jer; Meng, Wuzhang; Todd, Robert; Custer, Art; Dingus, Aaron; Erikson, Mark; et al

    2015-07-30

    In this study, devices and techniques that can, via physical vapor deposition,coat various surface contours or very long small aperture pipes, are described. Recently, a magnetron mole was developed in order to in-situ coat accelerator tube sections of the Brookhaven National Lab relativistic heavy ion collider that have 7.1 cm diameter with access points that are 500 m apart, for copper coat the accelerator vacuum tube in order to alleviate the problems of unacceptable ohmic heating and of electron clouds. A magnetron with a 50 cm long cathode was designed fabricated and successfully operated to copper coat a whole assemblymore » containing a full-size, stainless steel, cold bore, of the accelerator magnet tubing connected to two types bellows, to which two additional pipes made of accelerator tubing were connected. The magnetron is mounted on a carriage with spring loaded wheels that successfully crossed bellows and adjusted for variations in vacuum tube diameter, while keeping the magnetron centered. Electrical power and cooling water were fed through a cable bundle. The umbilical cabling system, which is enclosed in a flexible braided metal sleeve, is driven by a motorized spool. To increase cathode lifetime, movable magnet package was developed, and thickest possible cathode was made, with a rather challenging target to substrate distance of less than 1.5 cm. Optimized process to ensure excellent adhesion was developed. Coating thickness of 10 μm Cu passed all industrial tests and even exceeded maximum capability of a 12 kg pull test fixture. Room temperature radio frequency (RF) resistivity measurement indicated that 10 μm Cu coated stainless steel accelerator tube has conductivity close to copper tubing. Work is in progress to repeat the RF resistivity measurement at cryogenic temperatures. Over 20 years ago, a device using multi axis robotic manipulators controlling separate robotic assemblies resulted in nine-axes of motion combined with conformal shape of the cathodes that can adapt to various curved surface contours was developed and successfully used for depositing optical coating on aircraft canopies. The techniques can be utilized for in situ coating of elliptical and other surface contour RF cavities and long beam pipes with thick superconducting films. Plans are to incorporate ion assisted deposition in those techniques for attaining dense, adherent and defect free coatings.« less

  8. Coiled tubing 1994: Enhanced value through innovation

    SciTech Connect (OSTI)

    Teel, M.E.

    1994-01-01

    This paper discusses the growth in use of coiled tubing in well completion and development processes. Larger tubing is now available and operations expand into more demanding and critical areas as a result of research and development, innovation, and better understanding of materials and tube development. This article highlights significant coiled tubing operations, services, practices, and applications since 1990. It describes the types of materials used in coiled tubing and the strength associated with each type. Various case studies are described which use this tubing in both horizontal and directional drilling. It also is discussed as it relates to various types of enhanced recovery techniques for oil and gas wells.

  9. Economizer recirculation for low-load stability in heat recovery steam generator

    SciTech Connect (OSTI)

    Cuscino, R.T.; Shade, R.L. Jr.

    1986-04-15

    An economizer system is described for heating feedwater in a heat recovery steam generator which consists of: at least first and second economizer tube planes; each of the economizer tube planes including a plurality of generally parallel tubes; the tubes being generally vertically disposed; each of the economizer tube planes including a top header and a bottom header; all of the plurality of tubes in each economizer tube plane being connected in parallel to their top and bottom headers whereby parallel feedwater flow through the plurality of tubes between the top and bottom headers is enabled; one of the top and bottom headers being an inlet header; a second of the top and bottom headers being an outlet header; a boiler feed pump; the boiler feed pump being effective for applying a flow of feedwater to the inlet header; means for serially interconnecting the economizer tube planes; the means for serially interconnecting including means for flowing the feedwater upward and downward in tubes of alternating ones of the economizer tube planes between the inlet header and the outlet header; means for conveying heated feedwater from the outlet header to a using process; means for recirculating at least a portion of the heated feedwater from the outlet header to an inlet of the boiler feed pump; and the means for recirculating including means for relating the portion to a steam load in the using process whereby an increased flow is produced through all of the economizer tube planes at values of the steam load below a predetermined value and a condition permitting initiation of reverse flow in any of the tubes is substantially reduced.

  10. Coiled-tubing logging system

    SciTech Connect (OSTI)

    Howell, E.P.; Smith, L.J.; Blount, C.G.

    1988-03-01

    Techniques have been developed to use coiled tubing containing a seven-conductor wireline to facilitate logging operations. Equipment has been designed to permit the connection of conventional logging tools to the tubing and the recording of logs. Operating techniques have been developed and applied under various wellbore conditions. The system allows traditional log measurements in a well while wellbore conditions are controlled. Advantages of the system include reduced wellbore pressure during peroration to maximize perforation performance; lubrication during pulling or pushing a logging tool through a borehole so that a more uniform velocity can be maintained with a logging sonde; continued circulation and thus borehole stability during logging; temperature reduction for improved reliability of logging sonde electronics in hot holes; and more stable positioning of perforation equipment. The ability of coiled tubing to push tools down highly deviated or horizontal wellbores makes logging or perforating feasible in these wells. Expenses can often be reduced with coiled-tubing logging because a rig is unnecessary during many operations.

  11. Coiled-tubing logging system

    SciTech Connect (OSTI)

    Howell, E.P.; Smith, L.J.; Blount, C.G.

    1986-01-01

    Techniques have been developed which use coiled tubing containing a seven-conductor wireline to facilitate logging operations. Equipment has been designed which permits the connection of conventional logging tools to the tubing and the recording of logs. Also, operating techniques have been developed and applied under various wellbore conditions. The system allows traditional log measurements in a well while controlling wellbore conditions. Advantages of the system include: reduced wellbore pressure during perforation to minimize formation damage: lubrication while pulling or pushing a logging tool through a borehole so that a more uniform velocity can be maintained with a logging sonde; continued circulation and thus borehole stability while logging; temperature reduction for improved reliability of logging sonde electronics in hot holes; and more stable positioning of perforation equipment. The ability of coiled tubing to push tools down highly deviated, or even horizontal wellbores, makes logging or perforating feasible in these wells. Expenses can often be reduced with coiled-tubing logging, since a rig is unnecessary during many operations.

  12. Load sensing system

    DOE Patents [OSTI]

    Sohns, Carl W.; Nodine, Robert N.; Wallace, Steven Allen

    1999-01-01

    A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast

  13. Double wall vacuum tubing and method of manufacture

    DOE Patents [OSTI]

    Stahl, Charles R.; Gibson, Michael A.; Knudsen, Christian W.

    1989-01-01

    An evacuated double wall tubing is shown together with a method for the manufacture of such tubing which includes providing a first pipe of predetermined larger diameter and a second pipe having an O.D. substantially smaller than the I.D. of the first pipe. An evacuation opening is then in the first pipe. The second pipe is inserted inside the first pipe with an annular space therebetween. The pipes are welded together at one end. A stretching tool is secured to the other end of the second pipe after welding. The second pipe is then prestressed mechanically with the stretching tool an amount sufficient to prevent substantial buckling of the second pipe under normal operating conditions of the double wall pipe. The other ends of the first pipe and the prestressed second pipe are welded together, preferably by explosion welding, without the introduction of mechanical spacers between the pipes. The annulus between the pipes is evacuated through the evacuation opening, and the evacuation opening is finally sealed. The first pipe is preferably of steel and the second pipe is preferably of titanium. The pipes may be of a size and wall thickness sufficient for the double wall pipe to be structurally load bearing or may be of a size and wall thickness insufficient for the double wall pipe to be structurally load bearing, and the double wall pipe positioned with a sliding fit inside a third pipe of a load-bearing size.

  14. Sputter target

    DOE Patents [OSTI]

    Gates, Willard G.; Hale, Gerald J.

    1980-01-01

    The disclosure relates to an improved sputter target for use in the deposition of hard coatings. An exemplary target is given wherein titanium diboride is brazed to a tantalum backing plate using a gold-palladium-nickel braze alloy.

  15. Apparatus for connecting aligned abutted tubes

    DOE Patents [OSTI]

    Williams, R.E.

    1984-11-29

    An apparatus for connecting abutted tubes and for maintaining their rotary alignment during connection. The apparatus comprises first and second tubes, a rotation prevention element, a collar and a retainer. Each tube has inside and outside walls, and first and second ends, each end having an inside and outside edge. The first tube has portions defining a first plurality of cavities located at the outside edge of its first end. An external threaded portion is on the outside wall of the first tube and next to the first plurality of cavities. The second tube has portions defining a second plurality of cavities located at the outside edge of its first end. The first plurality has a different number than the second plurality. The first ends of the first and second tubes have substantially the same outside diameter and are abutted during connection so that an orifice is formed whenever first and second tube cavities substantially overlap. A rotation prevension element is placed in the orifice to prevent rotation of the first and second tubes. A collar with an internal threaded portion is slidably disposed about the second tube. The internal threaded portion engages the external threaded portion of the first tube to connect the tubes. A lip connected to the collar prevents separation of the collar from the second tube.

  16. PREDICTION OF OXIDE SCALE EXFOLIATION IN STEAM TUBES

    SciTech Connect (OSTI)

    Sabau, Adrian S; Wright, Ian G

    2010-01-01

    Numerical simulation results are presented for the prediction of the likelihood of oxide scale exfoliation from superheater tubes. The scenarios considered involved alloys T22, TP347H, and TP347HFG subjected to a simplified operating cycle in a power plant generating supercritical steam. The states of stress and strain of the oxides grown in steam were based solely on modeling the various phenomena experienced by superheater tubes during boiler operation, current understanding of the oxidation behavior of each alloy in steam, and consideration of operating parameters such as heat flux, tube dimensions, and boiler duty cycle. Interpretation of the evolution of strain in these scales, and the approach to conditions where scale failure (hence exfoliation) is expected, makes use of the type of Exfoliation Diagrams that incorporate various cracking and exfoliation criteria appropriate for the system considered. In these diagrams, the strain accumulation with time in an oxide is represented by a strain trajectory derived from the net strain resulting from oxide growth, differences in coefficients of thermal expansion among the components, and relaxation due to creep. It was found that an oxide growing on a tube subjected to routine boiler load cycling conditions attained relatively low values of net strain, indicating that oxide failure would not be expected to occur during normal boiler operation. However, during a boiler shut-down event, strains sufficient to exceed the scale failure criteria were developed after times reasonably in accord with plant experience, with the scales on the ferritic steel failing in tension, and those on the austenitic steels in compression. The results presented illustrate that using this approach to track the state of strain in the oxide scale through all phases of boiler operation, including transitions from full-to-low load and shut-down events, offers the possibility of identifying the phase(s) of boiler operation during which oxide failure is most likely to occur.

  17. Small bore ceramic laser tube inspection light table

    DOE Patents [OSTI]

    Updike, Earl O.

    1990-01-01

    Apparatus for inspecting small bore ceramic laser tubes, which includes a support base with one or more support rollers. A fluorescent light tube is inserted within the laser tube and the laser tube is supported by the support rollers so that a gap is maintained between the laser tube and the fluorescent tube to enable rotation of the laser tube. In operation, the ceramic tube is illuminated from the inside by the fluorescent tube to facilitate visual inspection. Centering the tube around the axial light of the fluorescent tube provides information about straightness and wall thickness of the laser tube itself.

  18. Load Model Data Tool

    Energy Science and Technology Software Center (OSTI)

    2013-04-30

    The LMDT software automates the process of the load composite model data preparation in the format supported by the major power system software vendors (GE and Siemens). Proper representation of the load composite model in power system dynamic analysis is very important. Software tools for power system simulation like GE PSLF and Siemens PSSE already include algorithms for the load composite modeling. However, these tools require that the input information on composite load to bemore » provided in custom formats. Preparation of this data is time consuming and requires multiple manual operations. The LMDT software enables to automate this process. Software is designed to generate composite load model data. It uses the default load composition data, motor information, and bus information as an input. Software processes the input information and produces load composition model. Generated model can be stored in .dyd format supported by GE PSLF package or .dyr format supported by Siemens PSSE package.« less

  19. Multiaxial cyclic ratcheting in coiled tubing -- Part 2. Experimental program and model evaluation

    SciTech Connect (OSTI)

    Rolovic, R.; Tipton, S.M.

    2000-04-01

    An experimental program was conducted to evaluate the plasticity model proposed in a separate paper (Part 1). Constant pressure, cyclic bend-straighten tests were performed to identify material parameters required by the analytical model. Block pressure, bend-straighten tests were conducted to evaluate the proposed model. Experiments were performed on full-size coiled steel tubing samples using a specialized test machine. Two commonly used coiled tubing materials and four specimen sizes were subjected to load histories consisting of bending-straightening cycles with varying levels of internal pressure. It was observed that cyclic ratcheting rates can be reversed without reversing the mean stress, i.e., diametral growth of coiled tubing can be followed by diametral shrinkage even when the internal pressure is kept positive, depending on the loading history. This material behavior is explained in the context of the new theory. The correlation between the predictions and the test data is very good.

  20. Coiled tubing solves multiple downhole problems

    SciTech Connect (OSTI)

    Bedford, S. ); Smith, I. )

    1994-11-01

    Declining reservoir pressure and water breakthrough in the UK North Sea Magnus field has coincided with general advances in application of coiled tubing and a continuous drive to reduce operating costs, particularly in a climate of weak oil prices. These factors have led to a dramatic increase in diversity and volume of coiled tubing interventions. In the following article, coiled tubing interventions, and results of those interventions, are discussed. An assessment of future coiled tubing activity on Magnus field is provided.

  1. Vacuum tube era: 1946-60

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vacuum tube era Vacuum tube era: 1946-60 The eminent Hungarian mathematician, John von Neumann, introduced Los Alamos to the world's first electronic digital "computer," the ENIAC (Electronic Numerical Integrator And Computer). The ENIAC was used to perform calculations to design and build the hydrogen bomb. July 10, 2015 Vacuum tubes Vacuum tubes "Highly accurate 3D computing is a Holy Grail of the Stockpile Stewardship Program's supercomputing efforts. As the weapons age, 3D

  2. Spring/dimple instrument tube restraint

    DOE Patents [OSTI]

    DeMario, E.E.; Lawson, C.N.

    1993-11-23

    A nuclear fuel assembly for a pressurized water nuclear reactor has a spring and dimple structure formed in a non-radioactive insert tube placed in the top of a sensor receiving instrumentation tube thimble disposed in the fuel assembly and attached at a top nozzle, a bottom nozzle, and intermediate grids. The instrumentation tube thimble is open at the top, where the sensor or its connection extends through the cooling water for coupling to a sensor signal processor. The spring and dimple insert tube is mounted within the instrumentation tube thimble and extends downwardly adjacent the top. The springs and dimples restrain the sensor and its connections against lateral displacement causing impact with the instrumentation tube thimble due to the strong axial flow of cooling water. The instrumentation tube has a stainless steel outer sleeve and a zirconium alloy inner sleeve below the insert tube adjacent the top. The insert tube is relatively non-radioactivated inconel alloy. The opposed springs and dimples are formed on diametrically opposite inner walls of the insert tube, the springs being formed as spaced axial cuts in the insert tube, with a web of the insert tube between the cuts bowed radially inwardly for forming the spring, and the dimples being formed as radially inward protrusions opposed to the springs. 7 figures.

  3. Spring/dimple instrument tube restraint

    DOE Patents [OSTI]

    DeMario, Edmund E.; Lawson, Charles N.

    1993-01-01

    A nuclear fuel assembly for a pressurized water nuclear reactor has a spring and dimple structure formed in a non-radioactive insert tube placed in the top of a sensor receiving instrumentation tube thimble disposed in the fuel assembly and attached at a top nozzle, a bottom nozzle, and intermediate grids. The instrumentation tube thimble is open at the top, where the sensor or its connection extends through the cooling water for coupling to a sensor signal processor. The spring and dimple insert tube is mounted within the instrumentation tube thimble and extends downwardly adjacent the top. The springs and dimples restrain the sensor and its connections against lateral displacement causing impact with the instrumentation tube thimble due to the strong axial flow of cooling water. The instrumentation tube has a stainless steel outer sleeve and a zirconium alloy inner sleeve below the insert tube adjacent the top. The insert tube is relatively non-radioactivated inconel alloy. The opposed springs and dimples are formed on diametrically opposite inner walls of the insert tube, the springs being formed as spaced axial cuts in the insert tube, with a web of the insert tube between the cuts bowed radially inwardly for forming the spring, and the dimples being formed as radially inward protrusions opposed to the springs.

  4. Manual tube-to-tubesheet welding torch

    DOE Patents [OSTI]

    Kiefer, Joseph H.; Smith, Danny J.

    1982-01-01

    A welding torch made of a high temperature plastic which fits over a tube intermediate the ends thereof for welding the juncture between the tube and the back side of a tube plate and has a ballooned end in which an electrode, filler wire guide, fiber optic bundle, and blanketing gas duct are disposed.

  5. Ionization tube simmer current circuit

    DOE Patents [OSTI]

    Steinkraus, R.F. Jr.

    1994-12-13

    A highly efficient flash lamp simmer current circuit utilizes a fifty percent duty cycle square wave pulse generator to pass a current over a current limiting inductor to a full wave rectifier. The DC output of the rectifier is then passed over a voltage smoothing capacitor through a reverse current blocking diode to a flash lamp tube to sustain ionization in the tube between discharges via a small simmer current. An alternate embodiment of the circuit combines the pulse generator and inductor in the form of an FET off line square wave generator with an impedance limited step up output transformer which is then applied to the full wave rectifier as before to yield a similar simmer current. 6 figures.

  6. Coiled tubing - Operations and services

    SciTech Connect (OSTI)

    Blount, C.G. )

    1993-05-01

    Perhaps the most exciting area of coil tubing technology in the oil and gas industry is the development and testing of specialized tools for improving existing operations or meeting the requirements of new applications and techniques. A new generation of surface equipment and downhole tools will greatly expand through-tubing well servicing utility. This paper provides descriptions of current peripheral devices for concentric well work. It also includes a look at what's needed to meet future challenges and advance this technology. It specifically discusses various forms of fishing tools, power tongs used for bring drill stem, orienting tools for drilling, downhole adjustment tools, steering tools, well casing materials, perforation tools, and various other support equipment.

  7. Coiled tubing helps gas production

    SciTech Connect (OSTI)

    Matheny, S.L. Jr.

    1980-08-11

    To boost production from its gas fields in Lake Erie, Consumers' Gas Co., Toronto, used a giant reel holding a 33,000-ft coil of 1-in. polypropylene-coated steel tubing to lay about 44 miles of control lines that now service 20 wells 17 miles offshore. As the forward motion of the boat unwound the tubing, the reel rig's hydraulic motor served as a brake to maintain the proper tension. This innovative method of laying the lines eliminated more than 80% of the pipe joints, correspondingly reduced the installation labor time, and improved the system's reliability. The two hydraulic-control lines that were laid actuate the gas-gathering line valves, while a hydrate-control line injects each well with methyl alcohol to inhibit hydrate formation.

  8. Ionization tube simmer current circuit

    DOE Patents [OSTI]

    Steinkraus, Jr., Robert F.

    1994-01-01

    A highly efficient flash lamp simmer current circuit utilizes a fifty percent duty cycle square wave pulse generator to pass a current over a current limiting inductor to a full wave rectifier. The DC output of the rectifier is then passed over a voltage smoothing capacitor through a reverse current blocking diode to a flash lamp tube to sustain ionization in the tube between discharges via a small simmer current. An alternate embodiment of the circuit combines the pulse generator and inductor in the form of an FET off line square wave generator with an impedance limited step up output transformer which is then applied to the full wave rectifier as before to yield a similar simmer current.

  9. HIGH CURRENT COAXIAL PHOTOMULTIPLIER TUBE

    DOE Patents [OSTI]

    Glass, N.W.

    1960-01-19

    A medium-gain photomultiplier tube having high current output, fast rise- time, and matched output impedance was developed. The photomultiplier tube comprises an elongated cylindrical envelope, a cylindrical anode supported at the axis of the envelope, a plurality of elongated spaced opaque areas on the envelope, and a plurality of light admitting windows. A photo-cathode is supported adjacent to each of the windows, and a plurality of secondary emissive dynodes are arranged in two types of radial arrays which are alternately positioned to fill the annular space between the anode and the envelope. The dynodes are in an array being radially staggered with respect to the dynodes in the adjacent array, the dynodes each having a portion arranged at an angle with respect to the electron path, such that electrons emitted by each cathode undergo multiplication upon impingement on a dynode and redirected flight to the next adjacent dynode.

  10. Cold cathode vacuum discharge tube

    DOE Patents [OSTI]

    Boettcher, Gordon E.

    1998-01-01

    A cold cathode vacuum discharge tube, and method for making same, with an interior surface of the trigger probe coated with carbon deposited by carbon vapor deposition (CVD) or diamond-like carbon (DLC) deposition. Preferably a solid graphite insert is employed in the probe-cathode structure in place of an aluminum bushing employed in the prior art. The CVD or DLC probe face is laser scribed to allow resistance trimming to match available trigger voltage signals and to reduce electrical aging.

  11. Underbalanced coiled tubing sidetrack successful

    SciTech Connect (OSTI)

    Adam, J.; Berry, M.

    1995-12-18

    The technique of drilling through a completion string, underbalanced, with coiled tubing eliminated some of the problems encountered with overbalanced drilling in a group of offset wells. This project confirmed that performing drilling operations in live wells can be carried out safely and effectively. Dalen is a sour gas field in the eastern part of The Netherlands and produces from vertical fractures in the Zechstein carbonate reservoir. The proposal for Dalen 2 was to abandon the lower section of the original hole and subsequently sidetrack conventionally to the top of the reservoir, run and cement a 5-in. liner, complete the well with a 5-in. monobore completion, and install the christmas tree. This part of the operation would be performed with a workover hoist. Thereafter, a 3 3/4-in. hole would be drilled through the completion and into the reservoir, underbalanced with coiled tubing. The drilling proposal had to address a number of key issues: creating underbalanced conditions; handling sour gas production at surface; handling and treating drilling fluids at surface; removing drilled solids from the returned fluid system; and deploying a long coiled tubing drilling bottom hole assembly (BHA) into a live well. The paper discusses planning, legislative issues, well preparation, the drilling program, and lessons learned.

  12. YouTube | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    YouTube YouTube Note: Since the YouTube platform is always evolving, so are our best practices for using it. We welcome feedback and suggestions to keep processes current and up-to-date. For more information, read our social media policy. What is YouTube and Why Should I Use It? YouTube is a video platform that allows users to publish and share videos for both public and private consumption with no hosting cost. Visitors to the site watch over 2 billion videos per day, much of which is

  13. Coiled tubing 1995 update: Production applications

    SciTech Connect (OSTI)

    Sas-Jaworsky II; Teel, M.E.

    1995-06-01

    This article reviews the use of coiled tubing in oil and gas well development and servicing. It reviews the new technology in tool development, concentric services, installation, and performance associated with coiled tubing. It provides numerous case studies of various offshore applications of coiled tubing for servicing of live wells without loosing production. Surface equipment and tool modifications allow tool segments to be connected, deployed, and retrieved in one trip. It also reviews the performance of the tubing for sand cleanouts, operation under high pressure environments, and for screen repairs. Finally, the article reviews the use of coiled tubing to enhance artificial lift technology.

  14. Turbine nozzle stage having thermocouple guide tube

    DOE Patents [OSTI]

    Schotsch, Margaret Jones (Greer, SC); Kirkpatrick, Francis Lawrence (late of Galway, NY); Lapine, Eric Michael (Northwood, NH)

    2002-01-01

    A guide tube is fixed adjacent opposite ends in outer and inner covers of a nozzle stage segment. The guide tube is serpentine in shape between the outer and inner covers and extends through a nozzle vane. An insert is disposed in the nozzle vane and has apertures to accommodate serpentine portions of the guide tube. Cooling steam is also supplied through chambers of the insert on opposite sides of a central insert chamber containing the guide tube. The opposite ends of the guide tube are fixed to sleeves, in turn fixed to the outer and inner covers.

  15. Minimum wear tube support hole design

    DOE Patents [OSTI]

    Glatthorn, Raymond H. (St. Petersburg, FL)

    1986-01-01

    A minimum-wear through-bore (16) is defined within a heat exchanger tube support plate (14) so as to have an hourglass configuration as determined by means of a constant radiused surface curvature (18) as defined by means of an external radius (R3), wherein the surface (18) extends between the upper surface (20) and lower surface (22) of the tube support plate (14). When a heat exchange tube (12) is disposed within the tube support plate (14) so as to pass through the through-bore (16), the heat exchange tube (12) is always in contact with a smoothly curved or radiused portion of the through-bore surface (16) whereby unacceptably excessive wear upon the heat exchange tube (12), as normally developed by means of sharp edges, lands, ridges, or the like conventionally part of the tube support plates, is eliminated or substantially reduced.

  16. Load regulating expansion fixture

    DOE Patents [OSTI]

    Wagner, L.M.; Strum, M.J.

    1998-12-15

    A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils is disclosed. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components. 1 fig.

  17. Load regulating expansion fixture

    DOE Patents [OSTI]

    Wagner, Lawrence M.; Strum, Michael J.

    1998-01-01

    A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components.

  18. Load sensing system

    DOE Patents [OSTI]

    Sohns, C.W.; Nodine, R.N.; Wallace, S.A.

    1999-05-04

    A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast inventories of stored nuclear material can be continuously monitored and inventoried of minimal cost. 4 figs.

  19. Multi-tube arrangement for combustor and method of making the multi-tube arrangement

    DOE Patents [OSTI]

    Ziminsky, Willy Steve (Simpsonville, SC)

    2012-07-31

    A fuel injector tube includes a one piece, unitary, polygonal tube having an inlet end and an outlet end. The fuel injector tube further includes a fuel passage extending from the inlet end to the outlet end along a longitudinal axis of the polygonal tube, a plurality of air passages extending from the inlet end to the outlet end and surrounding the fuel passage, and a plurality of fuel holes. Each fuel hole connects an air passage with the fuel passage. The inlet end of the polygonal tube is formed into a fuel tube. A fuel injector includes a plurality of fuel injector tubes and a plate. The plurality of fuel tubes are connected to the plate adjacent the inlet ends of the plurality of fuel injector tubes.

  20. High-voltage supply for neutron tubes in well-logging applications

    DOE Patents [OSTI]

    Humphreys, D.R.

    1982-09-15

    A high voltage supply is provided for a neutron tube used in well logging. The biased pulse supply of the invention combines DC and full pulse techniques and produces a target voltage comprising a substantial negative DC bias component on which is superimposed a pulse whose negative peak provides the desired negative voltage level for the neutron tube. The target voltage is preferably generated using voltage doubling techniques and employing a voltage source which generates bipolar pulse pairs having an amplitude corresponding to the DC bias level.

  1. Flow distribution analysis on the cooling tube network of ITER thermal shield

    SciTech Connect (OSTI)

    Nam, Kwanwoo; Chung, Wooho; Noh, Chang Hyun; Kang, Dong Kwon; Kang, Kyoung-O; Ahn, Hee Jae; Lee, Hyeon Gon

    2014-01-29

    Thermal shield (TS) is to be installed between the vacuum vessel or the cryostat and the magnets in ITER tokamak to reduce the thermal radiation load to the magnets operating at 4.2K. The TS is cooled by pressurized helium gas at the inlet temperature of 80K. The cooling tube is welded on the TS panel surface and the composed flow network of the TS cooling tubes is complex. The flow rate in each panel should be matched to the thermal design value for effective radiation shielding. This paper presents one dimensional analysis on the flow distribution of cooling tube network for the ITER TS. The hydraulic cooling tube network is modeled by an electrical analogy. Only the cooling tube on the TS surface and its connecting pipe from the manifold are considered in the analysis model. Considering the frictional factor and the local loss in the cooling tube, the hydraulic resistance is expressed as a linear function with respect to mass flow rate. Sub-circuits in the TS are analyzed separately because each circuit is controlled by its own control valve independently. It is found that flow rates in some panels are insufficient compared with the design values. In order to improve the flow distribution, two kinds of design modifications are proposed. The first one is to connect the tubes of the adjacent panels. This will increase the resistance of the tube on the panel where the flow rate is excessive. The other design suggestion is that an orifice is installed at the exit of tube routing where the flow rate is to be reduced. The analysis for the design suggestions shows that the flow mal-distribution is improved significantly.

  2. Cold cathode vacuum discharge tube

    DOE Patents [OSTI]

    Boettcher, G.E.

    1998-04-14

    A cold cathode vacuum discharge tube, and method for making same, with an interior surface of the trigger probe coated with carbon deposited by chemical vapor deposition (CVD) or diamond-like carbon (DLC) deposition are disclosed. Preferably a solid graphite insert is employed in the probe-cathode structure in place of an aluminum bushing employed in the prior art. The CVD or DLC probe face is laser scribed to allow resistance trimming to match available trigger voltage signals and to reduce electrical aging. 14 figs.

  3. Cold cathode vacuum discharge tube

    DOE Patents [OSTI]

    Boettcher, G.E.

    1998-03-10

    A cold cathode vacuum discharge tube, and method for making same, are disclosed with an interior surface of the trigger probe coated with carbon deposited by carbon vapor deposition (CVD) or diamond-like carbon (DLC) deposition. Preferably a solid graphite insert is employed in the probe-cathode structure in place of an aluminum bushing employed in the prior art. The CVD or DLC probe face is laser scribed to allow resistance trimming to match available trigger voltage signals and to reduce electrical aging. 15 figs.

  4. Various factors affect coiled tubing limits

    SciTech Connect (OSTI)

    Yang, Y.S.

    1996-01-15

    Safety and reliability remain the primary concerns in coiled tubing operations. Factors affecting safety and reliability include corrosion, flexural bending, internal (or external) pressure and tension (or compression), and mechanical damage due to improper use. Such limits as coiled tubing fatigue, collapse, and buckling need to be understood to avoid disaster. With increased use of coiled tubing, operators will gain more experience. But at the same time, with further research and development of coiled tubing, the manufacturing quality will be improved and fatigue, collapse, and buckling models will become more mature, and eventually standard specifications will be available. This paper reviews the uses of coiled tubing and current research on mechanical behavior of said tubing. It also discusses several models used to help predict fatigue and failure levels.

  5. Large Diameter Lasing Tube Cooling Arrangement

    DOE Patents [OSTI]

    Hall, Jerome P.; Alger, Terry W.; Anderson, Andrew T.; Arnold, Philip A.

    2004-05-18

    A cooling structure (16) for use inside a ceramic cylindrical tube (11) of a metal vapor laser (10) to cool the plasma in the tube (11), the cooling structure (16) comprising a plurality of circular metal members (17,31) and mounting members (18, 34) that position the metal members (17,31) coaxially in the tube (11) to form an annular lasing volume, with the metal members (17, 31) being axially spaced from each other along the length of the tube (11) to prevent the metal members from shorting out the current flow through the plasma in the tube (11) and to provide spaces through which the heat from localized hot spots in the plasma may radiate to the other side of the tube (11).

  6. Large diameter lasing tube cooling arrangement

    DOE Patents [OSTI]

    Hall, Jerome P. (Livermore, CA); Alger, Terry W. (Tracy, CA); Anderson, Andrew T. (Livermore, CA); Arnold, Phillip A. (Livermore, CA)

    2004-05-18

    A cooling structure (16) for use inside a ceramic cylindrical tube (11) of a metal vapor laser (10) to cool the plasma in the tube (11), the cooling structure (16) comprising a plurality of circular metal members (17, 31) and mounting members (18, 34) that position the metal members (17, 31) coaxially in the tube (11) to form an annular lasing volume, with the metal members (17, 31) being axially spaced from each other along the length of the tube (11) to prevent the metal members from shorting out the current flow through the plasma in the tube (11) and to provide spaces through which the heat from localized hot spots in the plasma may radiate to the other side of the tube (11).

  7. Tube support grid and spacer therefor

    DOE Patents [OSTI]

    Ringsmuth, Richard J.; Kaufman, Jay S.

    1986-01-01

    A tube support grid and spacers therefor provide radially inward preloading of heat exchange tubes to minimize stress upon base welds due to differential thermal expansion. The grid comprises a concentric series of rings and spacers with opposing concave sides for conforming to the tubes and V-shaped ends to provide resilient flexibility. The flexibility aids in assembly and in transmitting seismic vibrations from the tubes to a shroud. The tube support grid may be assembled in place to achieve the desired inwardly radial preloading of the heat exchange tubes. Tab and slot assembly further minimizes stresses in the system. The radii of the grid rings may be preselected to effect the desired radially inward preloading.

  8. Cable load sensing device

    DOE Patents [OSTI]

    Beus, Michael J.; McCoy, William G.

    1998-01-01

    Apparatus for sensing the magnitude of a load on a cable as the cable is employed to support the load includes a beam structure clamped to the cable so that a length of the cable lies along the beam structure. A spacer associated with the beam structure forces a slight curvature in a portion of the length of cable under a cable "no-load" condition so that the portion of the length of cable is spaced from the beam structure to define a cable curved portion. A strain gauge circuit including strain gauges is secured to the beam structure by welding. As the cable is employed to support a load the load causes the cable curved portion to exert a force normal to the cable through the spacer and on the beam structure to deform the beam structure as the cable curved portion attempts to straighten under the load. As this deformation takes place, the resistance of the strain gauges is set to a value proportional to the magnitude of the normal strain on the beam structure during such deformation. The magnitude of the normal strain is manipulated in a control device to generate a value equal to the magnitude or weight of the load supported by the cable.

  9. Helical buckling and lock-up conditions for coiled tubing in curved wells

    SciTech Connect (OSTI)

    He, X.; Kyllingstad, A.

    1995-03-01

    An improved formula for critical buckling loads has been derived. This formula, which takes the well curvature into account, has been verified in small scale laboratory tests. The theory has been applied to survey data from a real horizontal well and it predicts that the well curvature substantially affects the critical force for helical buckling, and thereby also the maximum run-in length of coiled tubing. Criteria for operational limits, such as lock-up and tubing failure, are also discussed in the paper.

  10. Preparation of nitrogen-doped carbon tubes

    DOE Patents [OSTI]

    Chung, Hoon Taek; Zelenay, Piotr

    2015-12-22

    A method for synthesizing nitrogen-doped carbon tubes involves preparing a solution of cyanamide and a suitable transition metal-containing salt in a solvent, evaporating the solvent to form a solid, and pyrolyzing the solid under an inert atmosphere under conditions suitable for the production of nitrogen-doped carbon tubes from the solid. Pyrolyzing for a shorter period of time followed by rapid cooling resulted in a tubes with a narrower average diameter.

  11. A loaded thermoacoustic engine

    SciTech Connect (OSTI)

    Olson, J.R.; Swift, G.W.

    1995-11-01

    Measurements and analysis of the performance of a thermoacoustic engine driving a dissipative load are presented. The effect of the load can be explained qualitatively using a simple low-amplitude approximation and quantitatively by invoking a more accurate low-amplitude numerical solution. The heater power {ital @};DQ and hot-end temperature {ital T}{sub {ital H}} are found to be simple functions of the load impedance and the unloaded values of {ital @};DQ and {ital T}{sub {ital H}}. {copyright} {ital 1995} {ital Acoustical} {ital Society} {ital of} {ital America}.

  12. Tire with outer groove containing bonded tube

    DOE Patents [OSTI]

    Welter, Carolin Anna; Chandra, Dinesh; Benedict, Robert Leon

    2016-02-16

    The invention relates generally to a pneumatic rubber tire which contains an outer, annular, circular groove which contains a flexible tube bonded to the walls of the groove.

  13. Eddy current measurement of tube element spacing

    DOE Patents [OSTI]

    Latham, Wayne Meredith; Hancock, Jimmy Wade; Grut, Jayne Marie

    1998-01-01

    A method of electromagnetically measuring the distance between adjacent tube elements in a heat exchanger. A cylindrical, high magnetic permeability ferrite slug is placed in the tube adjacent the spacing to be measured. A bobbin or annular coil type probe operated in the absolute mode is inserted into a second tube adjacent the spacing to be measured. From prior calibrations on the response of the eddy current coil, the signals from the coil, when sensing the presence of the ferrite slug, are used to determine the spacing between the tubes.

  14. Acoustic resonance in heat exchanger tube bundles

    SciTech Connect (OSTI)

    Blevins, R.D. )

    1994-02-01

    A series of experiments has been made on aeroacoustic tones produced by flow over tubes in a duct. The sound is characterized by the onset of a loud and persistent acoustic resonance. The acoustic resonance occurs at the frequency of the acoustic modes. The magnitude and extent of the resonance are functions of tube pattern and tube pitch. The sound levels increase in proportion with Mach number, dynamic head and pressure drop. A design procedure for predicting the magnitude of the sound within the tube array is presented. Methods of resonance avoidance are illustrated. An example is made for a large petrochemical heat exchanger.

  15. True Color Tube Borescope Inspection System

    Energy Science and Technology Software Center (OSTI)

    1997-08-07

    The overall purpose of TCTBIS is to determine the quality of the inside surface of a tube. This is done by acquiring multiple images along the inside of a tube and converting these images into one unwrapped image of the inside of a tube. This resultant image is the same as if you had slit a tube length-wise, flattened it out, and then taken a picture of it. What is unique about this system ismore » that the picture is acquired in a non-destructive manner. TCTBIS also analyzes the unwrapped images for oxidation, foreign particles, and surface imperfections, scratches.« less

  16. Loose-tube optical-fiber cable

    DOE Patents [OSTI]

    Lowell, Mark Edmund; Angers, Tyler Louis; Jonker, Jan Wigger

    2015-01-06

    The present invention relates to loose-tube optical-fiber cables that are capable of operating in high-temperature environments.

  17. GEIGER-MULLER TYPE COUNTER TUBE

    DOE Patents [OSTI]

    Fowler, I.L.; Watt, L.A.K.

    1959-12-15

    A single counter tube capable of responding to a wide range of intensities is described. The counter tube comprises a tubular cathode and an anode extending centrally of the cathode. The spacing between the outer surface of the anode and the inner surface of the cathode is varied along the length of the tube to provide different counting volumes in adjacent portions of the tube. A large counting volume in one portion adjacent to a low-energy absorption window gives adequate sensitivity for measuring lowintensity radiation, while a smaller volume with close electrode spacing is provided in the counter to make possible measurement of intense garnma radiation fields.

  18. Load research manual. Volume 3. Load research for advanced technologies

    SciTech Connect (OSTI)

    Brandenburg, L.; Clarkson, G.; Grund, Jr., C.; Leo, J.; Asbury, J.; Brandon-Brown, F.; Derderian, H.; Mueller, R.; Swaroop, R.

    1980-11-01

    This three-volume manual presents technical guidelines for electric utility load research. Special attention is given to issues raised by the load data reporting requirements of the Public Utility Regulatory Policies Act of 1978 and to problems faced by smaller utilities that are initiating load research programs. The manual includes guides to load research literature and glossaries of load research and statistical terms. In Volume 3, special load research procedures are presented for solar, wind, and cogeneration technologies.

  19. Load Monitoring CEC/LMTF Load Research Program

    SciTech Connect (OSTI)

    Huang, Zhenyu; Lesieutre, B.; Yang, Steve; Ellis, A.; Meklin, A.; Wong, B.; Gaikwad, A.; Brooks, D.; Hammerstrom, Donald J.; Phillips, John; Kosterev, Dmitry; Hoffman, M.; Ciniglio, O.; Hartwell, R.; Pourbeik, P.; Maitra, A.; Lu, Ning

    2007-11-30

    This white paper addresses the needs, options, current practices of load monitoring. Recommendations on load monitoring applications and future directions are also presented.

  20. Winning the fight against boiler tube failure

    SciTech Connect (OSTI)

    Cohen, J.; Dooley, B.

    1986-12-01

    Eliminating boiler tube failures could be worth $5 billion a year to the electric power industry. The causes and cures for the great majority of these ubiquitous failures are now known, with implications for change ranging from senior management to the maintenance crew. Methods for preventing boiler tube failure are discussed.

  1. Innovative applications stimulate coiled tubing development

    SciTech Connect (OSTI)

    Sas-Jaworsky, A. II; Bell, S.

    1996-06-01

    Coiled tubing (CT) is increasingly becoming a viable option to many conventional well operations worldwide. Advanced technology, new equipment and recent field applications have shown CT to be a lower-cost, reliable and effective tool for drilling and recompleting certain wells. Seven example applications from two recent coiled tubing technical conferences are described.

  2. Ultra-fast framing camera tube

    DOE Patents [OSTI]

    Kalibjian, Ralph (1051 Batavia Ave., Livermore, CA 94550)

    1981-01-01

    An electronic framing camera tube features focal plane image dissection and synchronized restoration of the dissected electron line images to form two-dimensional framed images. Ultra-fast framing is performed by first streaking a two-dimensional electron image across a narrow slit, thereby dissecting the two-dimensional electron image into sequential electron line images. The dissected electron line images are then restored into a framed image by a restorer deflector operated synchronously with the dissector deflector. The number of framed images on the tube's viewing screen is equal to the number of dissecting slits in the tube. The distinguishing features of this ultra-fast framing camera tube are the focal plane dissecting slits, and the synchronously-operated restorer deflector which restores the dissected electron line images into a two-dimensional framed image. The framing camera tube can produce image frames having high spatial resolution of optical events in the sub-100 picosecond range.

  3. Evolution of coiled tubing drilling technology accelerates

    SciTech Connect (OSTI)

    Simmons, J.; Adam, B.

    1993-09-01

    This paper reviews the status of coiled tubing technology in oil and gas drilling operations. The paper starts with a description of current coiled tubing technology and provides a cost comparison between conventional and coiled tubing drilling. The results show that offshore operations are already competitive while onshore operations will still lag behind conventional drilling methods. A list of known coiled tubing drilling operations is provided which gives the current borehole diameters and depths associated with this technology. The paper then goes on to provide the advantages and disadvantages of the technology. The advantages include improved well control, a continuous drillstring, reduced mobilization costs, simplified logging and measurement-while drilling measurements, and less tripping required. The disadvantages include high friction with the borehole wall, downhole motors required, limited drillhole size, and fatigued or damaged sections of the tubing cannot be removed. Finally, a review of the reliability of this technology is provided.

  4. Coiled tubing flowline cuts wetlands disturbance

    SciTech Connect (OSTI)

    Coats, E.A.; Marinello, S.A.

    1993-12-01

    Operators in environmentally sensitive wetland areas of South Louisiana have used jointed, or stickpipe flowlines to transmit oil and gas to and from wellsites and production facilities. Recently, a new method featuring coiled tubing was introduced, using it as a recyclable gas flowline. The coiled tubing method eliminates potential environmental damage that could occur when stickpipe is used and it allows the tubing to be easily recovered and reused when the well is taken out of service. This article describes economic advantages of using coiled tubing and how its use simplified environmental constraints encountered in swamps. It is an expanded version of the authors` presentation to World Oil`s Coiled Tubing Conference, Houston, March, 1993.

  5. PLUTONIUM-238 PRODUCTION TARGET DESIGN STUDIES

    SciTech Connect (OSTI)

    Hurt, Christopher J [ORNL; Wham, Robert M [ORNL; Hobbs, Randall W [ORNL; Owens, R Steven [ORNL; Chandler, David [ORNL; Freels, James D [ORNL; Maldonado, G Ivan [ORNL

    2014-01-01

    A new supply chain is planned for plutonium-238 using existing reactors at the Oak Ridge National Laboratory (ORNL) and Idaho National Laboratory (INL) and existing chemical recovery facilities at ORNL. Validation and testing activities for new irradiation target designs have been conducted in three phases over a 2 year period to provide data for scale-up to production. Target design, qualification, target fabrication, and irradiation of fully-loaded targets have been accomplished. Data from post-irradiation examination (PIE) supports safety analysis and irradiation of future target designs.

  6. Target assembly

    DOE Patents [OSTI]

    Lewis, Richard A.

    1980-01-01

    A target for a proton beam which is capable of generating neutrons for absorption in a breeding blanket includes a plurality of solid pins formed of a neutron emissive target material disposed parallel to the path of the beam and which are arranged axially in a plurality of layers so that pins in each layer are offset with respect to pins in all other layers, enough layers being used so that each proton in the beam will strike at least one pin with means being provided to cool the pins. For a 300 mA, 1 GeV beam (300 MW), stainless steel pins, 12 inches long and 0.23 inches in diameter are arranged in triangular array in six layers with one sixth of the pins in each layer, the number of pins being such that the entire cross sectional area of the beam is covered by the pins with minimum overlap of pins.

  7. Coiled tubing drilling (CTD) moves to commercial viability

    SciTech Connect (OSTI)

    Romagno, R. ); Walker, R. )

    1994-12-01

    Shell Western E and P, Inc. (SWEPI) California Drilling Operations was interested in coiled tubing (CT) for drilling slimhole steam injectors. A four-well pilot project at South Belridge field, Kern County, Calif., was targeted for immediate CT use. Well programs included completion, a goal not previously attempted on wells drilled from surface with CT. This paper reviews the primary project focus which was to develop slimhole steam injectors and improve injection profiles in lower Tulare formation E and G sands. Feasibility of drilling wells with CT and having CT crews run and cement completion tubulars in place was an issue to be determined. Conventional tubing installation is usually outside the scope of CT operations, so it was not known if this would be technically or economically feasible. Another goal was to refine personnel expertise to further develop CTD services as a successful business line. Other items targeted for investigation were: deviation control; lost circulation solutions; WOB optimization to obtain maximum ROP; potential steam blowout intervals; and high temperature. Finally, economic feasibility of using CTD as a rotary rig alternative for specific applications like slimhole wells on sites where surface location is limited was to be determined.

  8. Squeeze cement method using coiled tubing

    SciTech Connect (OSTI)

    Underdown, D.R.; Ashford, J.D.; Harrison, T.W.; Eastlack, J.K.; Blount, C.G.; Herring, G.D.

    1986-12-09

    A method is described of squeeze cementing a well wherein the well has a casing throughout the wellbore, casing cement between the casing and the wellbore of the well, perforations through the casing and the casing cement to establish fluid communication between the interior of the casing and a formation adjacent the perforations, channels in the casing cement in fluid communication with at least some of the perforations, a well tubing string in the casing extending from the surface to the proximity of the perforations, and a packer means for sealing between the tubing and the casing above the perforations. The method consists of: isolating the casing adjacent the perforations; lowering a coiled tubing down the well tubing string to a point adjacent the perforations; flowing uncontaminated squeeze cement through the coiled tubing and through the perforations into the channels; flowing a cement contaminating liquid down the coiled tubing to mix with the squeeze cement remaining in the casing; allowing the uncontaminated squeeze cement in the channels to harden; and removing the contaminated squeeze cement from the casing through the coiled tubing.

  9. Particle motion at fluidized bed tube surfaces

    SciTech Connect (OSTI)

    Drennen, J.F.; Hocking, W.R.; Howard, D.A.

    1990-06-01

    Metal loss from in-bed heat transfer tubes in fluidized bed combustors is recognized as a problem that is affecting the commercialization of FBC technology for coal utilization. A program has been initiated to address the erosion aspect of the wastage problem. Objectives were: (1) to develop a method for measuring the particle impact velocities and mass flux at a fluidized bed tube surface, (2) to obtain wear data from test tubes in an operating cold flow model, and (3) to correlate the results. An instrumented probe was develop during Phase I that could be used to obtain the three orthogonal velocity components and mass flux at a fluidized bed tube surface. The sensors were contained in a 2 inch diameter schedule 40 pipe that can be installed in the cold flow model in place of one of the test tubes. This arrangement allows measurements to be made non-intrusively. The velocity measuring portion used a Laser Doppler Velocimeter (LDV) for obtaining the resultant impact velocity and impact angle of the bed particles at the immersed tube surface. Mass flux was derived from the output of a high speed force transducer that measured the individual particle impact momentum signals. The above system was used successfully to measure particle impact velocities and momentum during a limited test program. Test were run in a 1 ft {times} 2 ft ambient temperature fluidized bed test facility using sand and acrylic test tubes. Measurements were taken in the center of the bed at eight circumferential location, by rotating the probe to the desired tube angle. Tube erosion data were also taken at locations corresponding to the above measurement points. The instrumentation provided a wealth of information about the internal hydrodynamics of the fluidized bed. 3 refs., 49 figs., 17 tabs.

  10. Improving Efficiency of Tube Drawing Bench | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency of Tube Drawing Bench Improving Efficiency of Tube Drawing Bench Greenville Tube Company, a manufacturer of high-precision, small-diameter stainless steel tubing, conducted an in-house system performance optimization project to improve the efficiency of its No. 6 tube drawing bench. This four-page case study summarizes their experience. PDF icon Improving Efficiency of Tube Drawing Bench (February 1997) More Documents & Publications Impacts of IPv6 on Infrastructure Control

  11. Multi-tube fuel nozzle with mixing features

    DOE Patents [OSTI]

    Hughes, Michael John

    2014-04-22

    A system includes a multi-tube fuel nozzle having an inlet plate and a plurality of tubes adjacent the inlet plate. The inlet plate includes a plurality of apertures, and each aperture includes an inlet feature. Each tube of the plurality of tubes is coupled to an aperture of the plurality of apertures. The multi-tube fuel nozzle includes a differential configuration of inlet features among the plurality of tubes.

  12. Scintillation probe with photomultiplier tube saturation indicator

    DOE Patents [OSTI]

    Ruch, Jeffrey F.; Urban, David J.

    1996-01-01

    A photomultiplier tube saturation indicator is formed by supplying a supplemental light source, typically an light emitting diode (LED), adjacent to the photomultiplier tube. A switch allows the light source to be activated. The light is forwarded to the photomultiplier tube by an optical fiber. If the probe is properly light tight, then a meter attached to the indicator will register the light from the LED. If the probe is no longer light tight, and the saturation indicator is saturated, no signal will be registered when the LED is activated.

  13. Starter for inductively coupled plasma tube

    DOE Patents [OSTI]

    Hull, D.E.; Bieniewski, T.M.

    1988-08-23

    A starter assembly is provided for use with an inductively coupled plasma (ICP) tube to reliably initiate a plasma at internal pressures above about 30 microns. A conductive probe is inserted within the inductor coil about the tube and insulated from the tube shield assembly. A capacitive circuit is arranged for momentarily connecting a high voltage radio-frequency generator to the probe while simultaneously energizing the coil. When the plasma is initiated the probe is disconnected from the generator and electrically connected to the shield assembly for operation. 1 fig.

  14. Starter for inductively coupled plasma tube

    DOE Patents [OSTI]

    Hull, Donald E.; Bieniewski, Thomas M.

    1988-01-01

    A starter assembly is provided for use with an inductively coupled plasma (ICP) tube to reliably initate a plasma at internal pressures above about 30 microns. A conductive probe is inserted within the inductor coil about the tube and insulated from the tube shield assembly. A capacitive circuit is arranged for momentarily connecting a high voltage radio-frequency generator to the probe while simultaneously energizing the coil. When the plasma is initiated the probe is disconnected from the generator and electrically connected to the shield assembly for operation.

  15. Corrosion degradation mechanisms in coiled tubing

    SciTech Connect (OSTI)

    Kane, R.D.; Cayard, M.S.

    1994-12-31

    This paper reviews the historical aspects related to the development of coiled tubing for oilfield drilling, logging, workover and production operations. It focuses on the metallurgical and process variables of coiled tubing and their interrelationship with aspects of the downhole service environment and the resultant corrosion performance. Special emphasis is placed on (1) operating conditions that can lead to excessive corrosion and/or cracking damage and corrosion fatigue and (2) metallurgical and processing parameters which can be controlled to maximize coiled tubing resistance to corrosion degradation.

  16. Coiled tubing facilitates deep underbalanced workover

    SciTech Connect (OSTI)

    Adams, L.S.; Overstreet, C.C.

    1997-03-31

    A recent workover shows the technical capability and cost effectiveness of coiled tubing for cleaning out scale in a 22,611-ft, low pressure, high-temperature gas well. The well, operated by Chevron USA Production Co., is in the Fort Stockton Gas Unit 5-1 Gomez (Ellenburger) field, in West Texas. The development of reliable 100,000-psi minimal yield strength coiled tubing was a major factor that allowed this work to succeed. The methods demonstrated by this workover are becoming a standard for deep well cleanouts in the Gomez (Ellenburger) field. The paper describes coiled tubing advantages, well history, and implementation.

  17. LOADING AND UNLOADING DEVICE

    DOE Patents [OSTI]

    Treshow, M.

    1960-08-16

    A device for loading and unloading fuel rods into and from a reactor tank through an access hole includes parallel links carrying a gripper. These links enable the gripper to go through the access hole and then to be moved laterally from the axis of the access hole to the various locations of the fuel rods in the reactor tank.

  18. Multidimensional spectral load balancing

    DOE Patents [OSTI]

    Hendrickson, Bruce A.; Leland, Robert W.

    1996-12-24

    A method of and apparatus for graph partitioning involving the use of a plurality of eigenvectors of the Laplacian matrix of the graph of the problem for which load balancing is desired. The invention is particularly useful for optimizing parallel computer processing of a problem and for minimizing total pathway lengths of integrated circuits in the design stage.

  19. Working session 3: Tubing integrity (Conference) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Conference: Working session 3: Tubing integrity Citation Details In-Document Search Title: Working session 3: Tubing integrity You are accessing a document from the Department ...

  20. Detection and Control of Deposition on Pendant Tubes in Kraft...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Detection and Control of Deposition on Pendant Tubes in Kraft Chemical Recovery Boilers Detection and Control of Deposition on Pendant Tubes in Kraft Chemical Recovery Boilers ...

  1. MHK Technologies/Anaconda bulge tube drives turbine | Open Energy...

    Open Energy Info (EERE)

    Anaconda bulge tube drives turbine < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Anaconda bulge tube drives turbine.jpg Technology Profile...

  2. Accelerator target

    DOE Patents [OSTI]

    Schlyer, David J.; Ferrieri, Richard A.; Koehler, Conrad

    1999-01-01

    A target includes a body having a depression in a front side for holding a sample for irradiation by a particle beam to produce a radioisotope. Cooling fins are disposed on a backside of the body opposite the depression. A foil is joined to the body front side to cover the depression and sample therein. A perforate grid is joined to the body atop the foil for supporting the foil and for transmitting the particle beam therethrough. A coolant is circulated over the fins to cool the body during the particle beam irradiation of the sample in the depression.

  3. Accelerator target

    DOE Patents [OSTI]

    Schlyer, D.J.; Ferrieri, R.A.; Koehler, C.

    1999-06-29

    A target includes a body having a depression in a front side for holding a sample for irradiation by a particle beam to produce a radioisotope. Cooling fins are disposed on a backside of the body opposite the depression. A foil is joined to the body front side to cover the depression and sample therein. A perforate grid is joined to the body atop the foil for supporting the foil and for transmitting the particle beam therethrough. A coolant is circulated over the fins to cool the body during the particle beam irradiation of the sample in the depression. 5 figs.

  4. Measuring alignment of loading fixture

    DOE Patents [OSTI]

    Scavone, Donald W. (Saratoga Springs, NY)

    1989-01-01

    An apparatus and method for measuring the alignment of a clevis and pin type loading fixture for compact tension specimens include a pair of substantially identical flat loading ligaments. Each loading ligament has two apertures for the reception of a respective pin of the loading fixture and a thickness less than one-half of a width of the clevis opening. The pair of loading ligaments are mounted in the clevis openings at respective sides thereof. The loading ligaments are then loaded by the pins of the loading fixture and the strain in each loading ligament is measured. By comparing the relative strain of each loading ligament, the alignment of the loading fixture is determined. Preferably, a suitable strain gage device is located at each longitudinal edge of a respective loading ligament equidistant from the two apertures in order to determine the strain thereat and hence the strain of each ligament. The loading ligaments are made substantially identical by jig grinding the loading ligaments as a matched set. Each loading ligament can also be individually calibrated prior to the measurement.

  5. Sample inlet tube for ion source

    DOE Patents [OSTI]

    Prior, David [Hermiston, OR; Price, John [Richland, WA; Bruce, Jim [Oceanside, CA

    2002-09-24

    An improved inlet tube is positioned within an aperture through the device to allow the passage of ions from the ion source, through the improved inlet tube, and into the interior of the device. The inlet tube is designed with a larger end and a smaller end wherein the larger end has a larger interior diameter than the interior diameter of the smaller end. The inlet tube is positioned within the aperture such that the larger end is pointed towards the ion source, to receive ions therefrom, and the smaller end is directed towards the interior of the device, to deliver the ions thereto. Preferably, the ion source utilized in the operation of the present invention is a standard electrospray ionization source. Similarly, the present invention finds particular utility in conjunction with analytical devices such as mass spectrometers.

  6. Staged multi-tube premixing injector

    DOE Patents [OSTI]

    Zuo, Baifang; Khan, Abdul Rafey; York, William David; Ziminsky, Willy Steve

    2012-10-02

    A fuel injection nozzle includes a body member having an upstream wall opposing a downstream wall, and an internal wall disposed between the upstream wall and the downstream wall, a first chamber partially defined by the an inner surface of the upstream wall and a surface of the internal wall, a second chamber partially defined by an inner surface of the downstream wall and a surface of the internal wall a first gas inlet communicative with the first chamber operative to emit a first gas into the first chamber, a second gas inlet communicative with the second chamber operative to emit a second gas into the second chamber, and a plurality of mixing tubes, each of the mixing tubes having a tube inner surface, a tube outer surface, a first inlet communicative with an aperture in the upstream wall operative to receive a third gas.

  7. Performance of a tapered pulse tube

    SciTech Connect (OSTI)

    Swift, G.; Allen, M.; Woolan, J.J.

    1998-02-01

    In a well instrumented pulse tube refrigerator having 1,500 W of cooling power at 125 K, the authors have measured the figure of merit of a tapered pulse tube at several operating points. At operating points near the operating point for which the taper was designed, the figure of merit is 0.96. This is close to the theoretical optimum figure of merit 0.97 calculated for this pulse tube considering only two loss mechanisms: heat conduction in the metal pulse tube wall and ordinary thermoacoustic heat transport in the gas within a few thermal penetration depths of the wall. At operating points farther from the design operating point, the measured figure of merit is much lower, as streaming driven convection adds a third loss mechanism.

  8. Sidetracking technology for coiled-tubing drilling

    SciTech Connect (OSTI)

    Leising, L.J.; Doremus, D.M.; Hearn, D.D.; Rike, E.A.; Paslay, P.R.

    1996-05-01

    Coiled-tubing (CT) drilling is a rapidly growing new technology that has been used for shallow new wells and re-entry applications. Through-tubing drilling has evolved as a major application for CT drilling. The remaining key enabling technology for viable through-tubing drilling is the ability to sidetrack in casing below the tubing tail. This paper describes the three technologies developed for sidetracking and presents a mathematical model of forces, penetration rates, and torques for window milling with the cement-sidetracking (CS) technique. Window milling has been a seat of the pants operation in the past. To the authors` knowledge, this is the first published work on the mechanics of window milling. The results from several yard tests and one field test are presented and show some of the problems associated with sidetracking.

  9. High-Pressure Tube Trailers and Tanks

    Broader source: Energy.gov [DOE]

    Presentation on High-Pressure Tube Trailers and Tanks for the DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review Meeting held February 8-9, 2005 at Argonne National Laboratory

  10. Coiled tubing cuts horizontal screen repair cost

    SciTech Connect (OSTI)

    Crow, W.; Hill, P.; Johnston, R.

    1996-01-01

    This article presents a case history of the successful workover performed by a coiled tubing unit (CTU) on Mississippi Canyon (MC) Block 109 Well A-24 in the US Gulf of Mexico to clean out sand and install new concentric screen for sand control. Workover design and operational details discussed are: Workover design -- hole-cleaning hydraulics, CT and screen predictions and comparison considerations; Workover operations -- cleanout, running packer and screens, coiled tubing (CT) weights, acid treatment and nitrogen lift and flow back.

  11. Tube construction for fluidized bed combustor

    DOE Patents [OSTI]

    De Feo, Angelo; Hosek, William

    1984-01-01

    A fluidized bed combustor comprises a reactor or a housing which has a windbox distributor plate adjacent the lower end thereof which contains a multiplicity of hole and air discharge nozzles for discharging air and coal into a fluidized bed which is maintained above the distributor plate and below a take-off connection or flue to a cyclone separator in which some of the products of combustion are treated to remove the dust which is returned into the fluidized bed. A windbox is spaced below the fluidized bed and it has a plurality of tubes passing therethrough with the passage of combustion air and fluidizing air which passes through an air space so that fluidizing air is discharged into the reaction chamber fluidized bed at the bottom thereof to maintain the bed in a fluidized condition. A fluid, such as air, is passed through the tubes which extend through the windbox and provide a preheating of the combustion air and into an annular space between telescoped inner and outer tubes which comprise heat exchanger tubes or cooling tubes which extend upwardly through the distributor plate into the fluidized bed. The heat exchanger tubes are advantageously arranged so that they may be exposed in groups within the reactor in a cluster which is arranged within holding rings.

  12. Fluidized bed combustor and tube construction therefor

    DOE Patents [OSTI]

    De Feo, Angelo; Hosek, William

    1981-01-01

    A fluidized bed combustor comprises a reactor or a housing which has a windbox distributor plate adjacent the lower end thereof which contains a multiplicity of hole and air discharge nozzles for discharging air and coal into a fluidized bed which is maintained above the distributor plate and below a take-off connection or flue to a cyclone separator in which some of the products of combustion are treated to remove the dust which is returned into the fluidized bed. A windbox is spaced below the fluidized bed and it has a plurality of tubes passing therethrough with the passage of combustion air and fluidizing air which passes through an air space so that fluidizing air is discharged into the reaction chamber fluidized bed at the bottom thereof to maintain the bed in a fluidized condition. A fluid, such as air, is passed through the tubes which extend through the windbox and provide a preheating of the combustion air and into an annular space between telescoped inner and outer tubes which comprise heat exchanger tubes or cooling tubes which extend upwardly through the distributor plate into the fluidized bed. The heat exchanger tubes are advantageously arranged so that they may be exposed in groups within the reactor in a cluster which is arranged within holding rings.

  13. Coiled tubing as initial production tubing: An overview of case histories

    SciTech Connect (OSTI)

    Nirider, H.L.; Snider, P.M.; Walsh, K.D.; Cordera, J.R.; Williams, J.

    1994-12-31

    From January, 1993 through July, 1994 Marathon Oil, Company completed ten newly drilled gas wells using coiled tubing as the initial production string. This paper reviews the operational aspects of each job and summarizes the areas where improvements in equipment and technique were implemented. The use of coiled tubing allows the tubing size to be closely matched to the performance of these relatively low rate wells, minimizing the tubular costs and improving the well`s ability to stay unloaded. The main areas of improvement from one job to the next involved the use of a pressurized, hydraulically operated access window, ensuring that all frac sand was cleaned out prior to landing the coiled tubing and employing a ``hot cut off`` system to make the final cut on the coil tubing. Lessons learned include keeping the coiled tubing size large enough to run smaller coiled tubing through it for clean out and slickline work, care in closing the BOP rams to avoid damaging the pipe and the use of wellhead equipment specifically designed for coiled tubing. This technique is especially suited to low pressure and water sensitive reservoirs where loss of fluid is of concern. An additional benefit is the cost savings from reducing the hole and casing sizes to match the reservoir potential. This completion technique is often quicker than using a conventional completion rig and jointed tubing.

  14. Load responsive hydrodynamic bearing

    DOE Patents [OSTI]

    Kalsi, Manmohan S.; Somogyi, Dezso; Dietle, Lannie L.

    2002-01-01

    A load responsive hydrodynamic bearing is provided in the form of a thrust bearing or journal bearing for supporting, guiding and lubricating a relatively rotatable member to minimize wear thereof responsive to relative rotation under severe load. In the space between spaced relatively rotatable members and in the presence of a liquid or grease lubricant, one or more continuous ring shaped integral generally circular bearing bodies each define at least one dynamic surface and a plurality of support regions. Each of the support regions defines a static surface which is oriented in generally opposed relation with the dynamic surface for contact with one of the relatively rotatable members. A plurality of flexing regions are defined by the generally circular body of the bearing and are integral with and located between adjacent support regions. Each of the flexing regions has a first beam-like element being connected by an integral flexible hinge with one of the support regions and a second beam-like element having an integral flexible hinge connection with an adjacent support region. A least one local weakening geometry of the flexing region is located intermediate the first and second beam-like elements. In response to application of load from one of the relatively rotatable elements to the bearing, the beam-like elements and the local weakening geometry become flexed, causing the dynamic surface to deform and establish a hydrodynamic geometry for wedging lubricant into the dynamic interface.

  15. Shot loading trainer analysis

    SciTech Connect (OSTI)

    Peterson, T.K.

    1995-02-15

    This document presents the results from the analysis of the shot loading trainer (SLT). This device will be used to test the procedure for installing shot into the annulus of the Project W-320 shipping container. To ensure that the shot is installed uniformly around the container, vibrators will be used to settle the shot. The SLT was analyzed to ensure that it would not jeopardize worker safety during operation. The results from the static analysis of the SLT under deadweight and vibrator operating loads show that the stresses in the SLT are below code allowables. The results from the modal analysis show that the natural frequencies of the SLT are far below the operating frequencies of the vibrators, provided the SLT is mounted on pneumatic tires. The SLT was also analyzed for wind, seismic, deadweight, and moving/transporting loads. Analysis of the SLT is in accordance with SDC-4.1 for safety class 3 structures (DOE-RL 1993) and the American Institute of Steel Construction (AISC) Manual of Steel Construction (AISC 1989).

  16. Electrical Load Modeling and Simulation

    SciTech Connect (OSTI)

    Chassin, David P.

    2013-01-01

    Electricity consumer demand response and load control are playing an increasingly important role in the development of a smart grid. Smart grid load management technologies such as Grid FriendlyTM controls and real-time pricing are making their way into the conventional model of grid planning and operations. However, the behavior of load both affects, and is affected by load control strategies that are designed to support electric grid planning and operations. This chapter discussed the natural behavior of electric loads, how it interacts with various load control and demand response strategies, what the consequences are for new grid operation concepts and the computing issues these new technologies raise.

  17. commercial load | OpenEI Community

    Open Energy Info (EERE)

    data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: applicationzip icon System Advisor Model Tool for Downloading Load Data...

  18. residential load | OpenEI Community

    Open Energy Info (EERE)

    data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: applicationzip icon System Advisor Model Tool for Downloading Load Data...

  19. load profile | OpenEI Community

    Open Energy Info (EERE)

    data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: applicationzip icon System Advisor Model Tool for Downloading Load Data...

  20. Ultrasonic liquid-in-line detector for tubes

    DOE Patents [OSTI]

    Piper, Thomas C.

    1991-01-01

    An apparatus and method for detecting the presence of liquid in pipes or tubes using ultrasonic techniques A first piezoelectric crystal is coupled to the outside of the pipe or tube at the location where liquid in the tube is to be detected. A second piezoelectric crystal is coupled to the outside of the pipe or tube at the same location along the tube but circumferentially displaced from the first crystal by an angle around the pipe or tube of less than 180.degree.. Liquid in the pipe or tube is detected by measuring the attenuation of an ultrasonic signal sent by the first piezoelectric crystal and received by the second piezoelectric crystal.

  1. Method and apparatus for optimized sampling of volatilizable target substances

    DOE Patents [OSTI]

    Lindgren, Eric R.; Phelan, James M.

    2002-01-01

    An apparatus for capturing, from gases such as soil gas, target analytes. Target analytes may include emanations from explosive materials or from residues of explosive materials. The apparatus employs principles of sorption common to solid phase microextraction, and is best used in conjunction with analysis means such as a gas chromatograph. To sorb target analytes, the apparatus functions using various sorptive structures to capture target analyte. Depending upon the embodiment, those structures may include 1) a conventional solid-phase microextraction (SPME) fiber, 2) a SPME fiber suspended in a capillary tube (with means provided for moving gases through the capillary tube so that the gases come into close proximity to the suspended fiber), and 3) a capillary tube including an interior surface on which sorptive material (similar to that on the surface of a SPME fiber) is supported (along with means for moving gases through the capillary tube so that the gases come into close proximity to the sorptive material). In one disclosed embodiment, at least one such sorptive structure is associated with an enclosure including an opening in communication with the surface of a soil region potentially contaminated with buried explosive material such as unexploded ordnance. Emanations from explosive materials can pass into and accumulate in the enclosure where they are sorbed by the sorptive structures. Also disclosed is the use of heating means such as microwave horns to drive target analytes into the soil gas from solid and liquid phase components of the soil.

  2. Automated Diagnosis and Classification of Steam Generator Tube Defects

    SciTech Connect (OSTI)

    Dr. Gabe V. Garcia

    2004-10-01

    A major cause of failure in nuclear steam generators is tube degradation. Tube defects are divided into seven categories, one of which is intergranular attack/stress corrosion cracking (IGA/SCC). Defects of this type usually begin on the outer surface of the tubes and propagate both inward and laterally. In many cases these defects occur at or near the tube support plates. Several different methods exist for the nondestructive evaluation of nuclear steam generator tubes for defect characterization.

  3. Plug Loads Conservation Measures

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    This software requires inputs of simple plug loads inventory information and calculates the energy and cost benefits of various retrofit opportunities. This tool includes energy conservation measures for: Vending Machine Misers, Delamp Vending Machine, Desktop to Laptop retrofit, CRT to LCD monitors retrofit, Computer Power Management Settings, and Energy Star Refrigerator retrofit. This tool calculates energy savings, demand reduction, cost savings, building life cycle costs including: simple payback, discounted payback, net-present value, and savings tomore » investment ratio. In addition this tool also displays the environmental benefits of a project.« less

  4. Variable loading roller

    DOE Patents [OSTI]

    Williams, Daniel M.

    1989-01-01

    An automatic loading roller for transmitting torque in traction drive devices in manipulator arm joints includes a two-part camming device having a first cam portion rotatable in place on a shaft by an input torque and a second cam portion coaxially rotatable and translatable having a rotating drive surface thereon for engaging the driven surface of an output roller with a resultant force proportional to the torque transmitted. Complementary helical grooves on the respective cam portions interconnected through ball bearings interacting with those grooves effect the rotation and translation of the second cam portion in response to rotation of the first.

  5. Multidimensional spectral load balancing

    SciTech Connect (OSTI)

    Hendrickson, B.; Leland, R.

    1993-01-01

    We describe an algorithm for the static load balancing of scientific computations that generalizes and improves upon spectral bisection. Through a novel use of multiple eigenvectors, our new spectral algorithm can divide a computation into 4 or 8 pieces at once. These multidimensional spectral partitioning algorithms generate balanced partitions that have lower communication overhead and are less expensive to compute than those produced by spectral bisection. In addition, they automatically work to minimize message contention on a hypercube or mesh architecture. These spectral partitions are further improved by a multidimensional generalization of the Kernighan-Lin graph partitioning algorithm. Results on several computational grids are given and compared with other popular methods.

  6. Variable loading roller

    DOE Patents [OSTI]

    Williams, D.M.

    1988-01-21

    An automatic loading roller for transmitting torque in traction drive devices in manipulator arm joints includes a two-part camming device having a first cam portion rotatable in place on a shaft by an input torque and a second cam portion coaxially rotatable and translatable having a rotating drive surface thereon for engaging the driven surface of an output roller with a resultant force proportional to the torque transmitted. Complementary helical grooves in the respective cam portions interconnected through ball bearings interacting with those grooves effect the rotation and translation of the second cam portion in response to rotation of the first. 14 figs.

  7. Pumpdown assistance extends coiled tubing reach

    SciTech Connect (OSTI)

    Tailby, R.J. )

    1992-07-01

    One of the most challenging coiled tubing applications to emerge in the last few years is horizontal well maintenance. When wireline cannot be used, techniques that offer some of the same flexibility, availability and relatively low cost must be used. During this same period, however, drilling technology has also made huge strides in horizontal and extended-reach areas. Wells are now being drilled with horizontal lengths in excess of 6,000 ft and measured depths of more than 22,000 ft. This paper reports that although horizontal wells are definitely here to stay, many operators have had to reevaluate their positions after being confronted with the problem of recompleting these wells to eliminate excessive water or gas production. A full workover with workstring using either a drilling rig or snubbing unit can be expensive and may lead to lost production because of limited rig availability. Coiled tubing has successfully been used in most cases thus far, but it has length and horizontal reach limitations that drilling technology will soon overtake. Within the constraints of current technology and tube capabilities, coiled tubing does not have the buckling resistance or reel capacity to service today's longest horizontal and extended reach wells or those planned and foreseen in the future. Even if coiled tubing can reach TD, operations requiring downward force are severely restricted.

  8. Coiled tubing drilling: Real time MWD with dedicated powers to the BHA

    SciTech Connect (OSTI)

    Leismer, D.; Williams, B.; Pursell, J.

    1996-12-31

    This paper describes and analyzes the development and ongoing field trials of a Real Time MWD Coiled Tubing Drilling System. The new system holds great promise for advancing the state of coiled tubing drilling for certain applications. The system is designed for through-tubing, short radius re-entry and drilling highly deviated wells as horizontal laterals to a geologic target with minimum wellbore tortuosity. Currently, 4-1/2-in production tubing is the smallest re-entry candidate. Real time MWD and Bottom Hole Assembly (BHA) control is achieved by the use of a combination hydraulic and electric umbilical internal to the coiled tubing (CT), allowing continuous data collection and selective surface control of the BHA components. This communication line allows orientation in 10{degree} increments (or less) while drilling, applies weight-on-bit and operates a reusable circulating valve. In addition, the umbilical provides real-time monitoring of weight-on-bit, circulating pressures of the drilling fluid internal and external to the BHA, dedicated hydraulic system bottom hole pressure, downhole temperature and survey data from logging equipment.

  9. Dynamic stability of a spinning tube conveying a fluid through a symmetrical noncircular cross-section

    SciTech Connect (OSTI)

    Benedetti, G.A.

    1990-11-01

    When a fluid flows inside a tube, the deformations of the tube can interact with the fluid flowing within it and these dynamic interactions can result in significant lateral motions of the tube and the flowing fluid. The purpose of this report is to examine the dynamic stability of a spinning tube through which an incompressible frictionless fluid is flowing. The tube can be considered as either a hollow beam or a hollow cable. The analytical results can be applied to spinning or stationary tubes through which fluids are transferred; e.g., liquid coolants, fuels and lubricants, slurry solutions, and high explosives in paste form. The coupled partial differential equations are determined for the lateral motion of a spinning Bernoulli-Euler beam or a spinning cable carrying an incompressible flowing fluid. The beam, which spins about an axis parallel to its longitudinal axis and which can also be loaded by a constant axial force, is straight, uniform, simply supported, and rests on a massless, uniform elastic foundation that spins with the beam. Damping for the beam and foundation is considered by using a combined uniform viscous damping coefficient. The fluid, in addition to being incompressible, is frictionless, has a constant density, and flows at a constant speed relative to the longitudinal beam axis. The Galerkin method is used to reduce the coupled partial differential equations for the lateral motion of the spinning beam to a coupled set of 2N, second order, ordinary differential equations for the generalized beam coordinates. By simplifying these equations and examining the roots of the characteristic equation, an analytical solution is obtained for the lateral dynamic instability of the beam (or cable). The analytical solutions determined the minimum critical fluid speed and the critical spin speeds, for a specified fluid speed, in terms of the physical parameters of the system.

  10. Zero dead volume tube to surface seal

    DOE Patents [OSTI]

    Benett, William J.; Folta, James A.

    2000-01-01

    A method and apparatus for connecting a tube to a surface that creates a dead volume seal. The apparatus is composed of three components, a body, a ferrule, and a threaded fitting. The ferrule is compressed onto a tube and a seal is formed between the tube and a device retained in the body by threading the fitting into the body which provides pressure that seals the face of the ferrule to a mating surface on the device. This seal can be used at elevated temperatures depending on the materials used. While the invention has been developed for use with micro-machined silicon wafers used in Capillary Gas Chromatograph (GC), it can be utilized anywhere for making a gas or fluid face seal to the surface of a device that has near zero dead volume.

  11. Unusual superheater tube wastage associated with carburization

    SciTech Connect (OSTI)

    Lopez-Lopez, D.; Wong-Noreno, A. ); Martinez, L. . Programa de Corrosion del Golfo de Mexico)

    1994-12-01

    The effects of operational power changes on the corrosion of ASTM A 213 type 321H (UNS S32109) stainless steel tubes in a steam superheater were studied. The fuel oil consumed in the plant is high in sulfur, vanadium, and asphalt content. After 107,000 hours of service, the tubes were seriously corroded and developed cracking of the oxide layer. The cracking was associated with frequent temperature changes. Bursts of carbon coke and soot particles deposited on tube surfaces and introduced a carburization process in the steel matrix. Carbon-rich deposits formed in the grain boundaries of the austenitic metal matrix. A carburization-corrosion process caused the intergranular wastage of the steel near the exposed surfaces.

  12. Tube curvature measuring probe and method

    DOE Patents [OSTI]

    Sokol, George J.

    1990-01-01

    The present invention is directed to a probe and method for measuring the radius of curvature of a bend in a section of tubing. The probe includes a member with a pair of guide means, one located at each end of the member. A strain gauge is operatively connected to the member for detecting bending stress exrted on the member as the probe is drawn through and in engagement with the inner surface of a section of tubing having a bend. The method of the present invention includes steps utilizing a probe, like the aforementioned probe, which can be made to detect bends only in a single plane when having a fixed orientation relative the section of tubing to determine the maximum radius of curvature of the bend.

  13. Systems and methods for processing irradiation targets through a nuclear reactor

    DOE Patents [OSTI]

    Dayal, Yogeshwar; Saito, Earl F.; Berger, John F.; Brittingham, Martin W.; Morales, Stephen K.; Hare, Jeffrey M.

    2016-05-03

    Apparatuses and methods produce radioisotopes in instrumentation tubes of operating commercial nuclear reactors. Irradiation targets may be inserted and removed from instrumentation tubes during operation and converted to radioisotopes otherwise unavailable during operation of commercial nuclear reactors. Example apparatuses may continuously insert, remove, and store irradiation targets to be converted to useable radioisotopes or other desired materials at several different origin and termination points accessible outside an access barrier such as a containment building, drywell wall, or other access restriction preventing access to instrumentation tubes during operation of the nuclear plant.

  14. Sidetracking technology for coiled tubing drilling

    SciTech Connect (OSTI)

    Leising, L.J.; Hearn, D.D.; Rike, E.A.

    1995-12-31

    Coiled tubing (CT) drilling is a rapidly growing new technology that has been used for shallow new wells and reentry applications. A new market has evolved as being a major application for CT drilling. This market is through-tubing drilling. The lower cost of mobilization of a coiled tubing unit (CTU) to an offshore platform or Arctic wellsite vs. a rotary rig provides additional economic incentive. In addition, the ease of drilling 4-3/4-in. and smaller boreholes with CT is an advantage in a region which does not have an established practice of slimhole drilling. The remaining key enabling technology for viable through-tubing drilling is the ability to sidetrack in casing below the tubing tail. The three technologies (cement sidetracking, whipstock in cement, and through-tubing whipstock) that have been developed for sidetracking are described in this paper. A mathematical model of forces, penetration rates, and torques for window milling with the cement sidetracking technique is presented. Window milling has been a {open_quotes}seat of the pants{close_quotes} operation in the past, to the authors` knowledge, this is the first published work on the mechanics of window milling. The analysis has shed much light on the interaction between motor bending stiffness, motor bend angle, and allowable advance rates for {open_quotes}time drilling.{close_quotes} The results from several yard tests are presented, and indicate some of the problems associated with sidetracking. The photographs of the sectioned hole/window illustrate the ledges caused downhole from {open_quotes}minor{close_quotes} bottomhole assembly (BHA) changes. The cement sidetrack technique has been successfully applied many times in the field, and the results of one of these field applications is presented.

  15. Segmented instrumentation tube including a locking sleeve for interlocking the segments of the instrumentation tube

    DOE Patents [OSTI]

    Obermeyer, F.D.

    1993-11-16

    Segmented instrumentation tube including a locking sleeve for interlocking the segments of the instrumentation tube, so that the threaded ends of the instrumentation tube do not unthread when subjected to vibration, such an instrumentation tube being suitable for use in a nuclear reactor pressure vessel. The instrumentation tube has a first member having a threaded end portion that has a plurality of first holes circumferentially around the outside surface thereof. The instrumentation tube also has a second member having a threaded end portion that has a plurality of second holes circumferentially around the outside surface thereof. The threads of the second member are caused to threadably engage the threads of the first member for defining a threaded joint there between. A sleeve having an inside surface surrounds the end portion of the first member and the end portion of the second member and thus surrounds the threaded joint. The sleeve includes a plurality of first projections and second projections that outwardly extend from the inside surface to engage the first holes and the second holes, respectively. The outside surface of the sleeve is crimped or swaged at the locations of the first projections and second projections such that the first projections and the second projections engage their respective holes. In this manner, independent rotation of the first member with respect to the second member is prevented, so that the instrumentation tube will not unthread at its threaded joint. 10 figures.

  16. Segmented instrumentation tube including a locking sleeve for interlocking the segments of the instrumentation tube

    DOE Patents [OSTI]

    Obermeyer, Franklin D. (Pensacola, FL)

    1993-01-01

    Segmented instrumentation tube including a locking sleeve for interlocking the segments of the instrumentation tube, so that the threaded ends of the instrumentation tube do not unthread when subjected to vibration, such an instrumentation tube being suitable for use in a nuclear reactor pressure vessel. The instrumentation tube has a first member having a threaded end portion that has a plurality of first holes circumferentially around the outside surface thereof. The instrumentation tube also has a second member having a threaded end portion that has a plurality of second holes circumferentially around the outside surface thereof. The threads of the second member are caused to threadably engage the threads of the first member for defining a threaded joint therebetween. A sleeve having an inside surface surrounds the end portion of the first member and the end portion of the second member and thus surrounds the threaded joint. The sleeve includes a plurality of first projections and second projections that outwardly extend from the inside surface to engage the first holes and the second holes, respectively. The outside surface of the sleeve is crimped or swaged at the locations of the first projections and second projections such that the first projections and the second projections engage their respective holes. In this manner, independent rotation of the first member with respect to the second member is prevented, so that the instrumentation tube will not unthread at its threaded joint.

  17. THERMAL OSCILLATIONS IN LIQUID HELIUM TARGETS.

    SciTech Connect (OSTI)

    WANG,L.; JIA,L.X.

    2001-07-16

    A liquid helium target for the high-energy physics was built and installed in the proton beam line at the Alternate Gradient Synchrotron of Brookhaven National Laboratory in 2001. The target flask has a liquid volume of 8.25 liters and is made of thin Mylar film. A G-M/J-T cryocooler of five-watts at 4.2K was used to produce liquid helium and refrigerate the target. A thermosyphon circuit for the target was connected to the J-T circuit by a liquid/gas separator. Because of the large heat load to the target and its long transfer lines, thermal oscillations were observed during the system tests. To eliminate the oscillation, a series of tests and analyses were carried out. This paper describes the phenomena and provides the understanding of the thermal oscillations in the target system.

  18. Flight Path Target 2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Target 2 provides experimenters direct access to the 800 MeV proton beam as well as several flight paths. Target 2 is located in MPF-7 at LANSCE.. Target 2 Target 2 is housed in...

  19. Targets and target wheel mechanism for APEX

    SciTech Connect (OSTI)

    Roa, D.E.

    1995-10-01

    A rotating target wheel system built for the ATLAS Positron Experiment (APEX) will be described. It is designed so that targets can withstand the heating caused by the energy loss of intense heavy ion beams. A unique feature is the use of a digital encoder to provide logic trigger signals for beam sweeping and event-by-event target location information. Techniques for fabricating targets of tantalum, lead, thorium and uranium and the behavior of the targets during beam exposure will be discussed.

  20. Savannah River reactor process water heat exchanger tube structural integrity margin Task Number 92-005-1

    SciTech Connect (OSTI)

    Mertz, G.E.; Barnes, D.M.; Sindelar, R.L.

    1992-02-01

    Twelve process water heat exchangers are designed to remove heat generated in the reactor tank. Each heat exchanger has approximately 9000, 1/2 inch diameter {times} 0.049 inches thick tubes. Minimum structural tubing requirements and the leak rate through postulated tubing defects are developed in this report A comparison of the structural requirements and the defect size calculated to produce leak rates of 0.5 lbs./day demonstrate adequate structural margins against gross tube rupture. Commercial nuclear experience with pressurized water reactor (PWR) steam generator plugging criteria are used for guidance in performing this analysis. It is important to note that the SRS reactors are low energy systems with normal operating pressures of 203 psig at 130{degree}F while the PWR is a high energy system with operating pressures near 2200 psig at 600{degree}F. Clearly the PVM steam generator has loadings which are more severe than the SRS heat exchangers. Consistent with the Regulatory Guide 1.121 criteria both wastage (wall thinning) and cracking are addressed. Structural limits on wall thinning and crack size are developed to preclude gross rupture. ASME Section XI criteria, with the factors of safety recommended by Regulatory Guide 1.121 are used to develop the allowable crack size criteria. Normal operating conditions (pressure, dead weight, and hydraulic drag) are considered with seismic and water hammer accident conditions. Both the wall thinning and crack size criteria are developed for the end-of-evaluation period. Allowances for corrosion, wear, or crack growth have not been included in this analysis Structurally, the tubing is over designed and can tolerate large defects with adequate margins against gross rupture. The structural margins of heat exchanger tubing are evident by contrasting the tubing`s structural capacity, per the ASME Code, with its operating conditions/configuration.

  1. Instrumented tube burns: theoretical and experimental observations

    SciTech Connect (OSTI)

    Yarrington, Cole Davis; Obrey, Stephen J; Foley, Timothy J; Son, Steven F

    2009-01-01

    The advent of widely available nanoscale energetic composites has resulted in a flurry of novel applications. One of these applications is the use of nanomaterials in energetic compositions. In compositions that exhibit high sensitivity to stimulus, these materials are often termed metastable intermolecular composites (MIC). More generally, these compositions are simply called nanoenergetics. Researchers have used many different experimental techniques to analyze the various properties of nanoenergetic systems. Among these various techniques, the confined tube burn is a simple experiment that is capable of obtaining much data related to the combustion of these materials. The purpose of this report is to review the current state of the confined tube burn experiment, including the drawbacks of the technique and possible remedies. As this report is intended to focus on the specific experimental technique, data from many different energetic materials, and experimental configurations will be presented. The qualitative and quantitative data that can be gathered using confined tube burn experiments include burning rates, total impulse, pressure rise rate, and burning rate differences between different detector types. All of these measurements lend insight into the combustion properties and mechanisms of specific nanoenergetics. Finally, certain data indicates a more complicated flow scenario which may need to be considered when developing burn tube models.

  2. Equation determines pressure drop in coiled tubing

    SciTech Connect (OSTI)

    Yang, Y.S.

    1995-12-04

    A single equation can determine the pressure drop in wells with laminar, transitional, and turbulent incompressible fluid flow in coiled tubing or other steel tubulars. The single equation is useful, especially in computer-aided design and operations. The equation is derived and illustrated by an example.

  3. Further advances in coiled-tubing drilling

    SciTech Connect (OSTI)

    Eide, E.; Brinkhorst, J.; Voelker, H.; Burge, P.; Ewen, R.L.

    1994-12-31

    The use of coiled tubing to drill horizontal re-entry wells has received considerable interest in the industry over the last two years. The benefit of being able to drill at balance, safely and in a controlled manner, using nitrogen to reduce down hole pressure while drilling highly depleted reservoirs, provides an advantage over conventional techniques, particularly in reducing impairment to the formation. The paper describes such a horizontal re-entry drilled in the shallow depleted water flooded reservoir Barenburg in Northern Germany. The entire program was executed with no intervention from a conventional rig or workover hoist. A special structure to be positioned over the well to support the coiled tubing injector head and to provide a work platform had to be constructed for this type of operation. A dedicated mast for lifting of pipe and down hole tools was placed on the substructure. The development of a surface controlled orienting tool and an adjustable motor provided excellent directional capabilities on a 2 3/8 in. coiled tubing. This program represents a significant extension of the capabilities of drilling with coiled tubing.

  4. Stress-Assisted Corrosion in Boiler Tubes

    SciTech Connect (OSTI)

    Preet M Singh; Steven J Pawel

    2006-05-27

    A number of industrial boilers, including in the pulp and paper industry, needed to replace their lower furnace tubes or decommission many recovery boilers due to stress-assisted corrosion (SAC) on the waterside of boiler tubes. More than half of the power and recovery boilers that have been inspected reveal SAC damage, which portends significant energy and economic impacts. The goal of this project was to clarify the mechanism of stress-assisted corrosion (SAC) of boiler tubes for the purpose of determining key parameters in its mitigation and control. To accomplish this in-situ strain measurements on boiler tubes were made. Boiler water environment was simulated in the laboratory and effects of water chemistry on SAC initiation and growth were evaluated in terms of industrial operations. Results from this project have shown that the dissolved oxygen is single most important factor in SAC initiation on carbon steel samples. Control of dissolved oxygen can be used to mitigate SAC in industrial boilers. Results have also shown that sharp corrosion fatigue and bulbous SAC cracks have similar mechanism but the morphology is different due to availability of oxygen during boiler shutdown conditions. Results are described in the final technical report.

  5. EBR-II Superheater Duplex Tube Examination

    SciTech Connect (OSTI)

    Daniel M. Wachs; Dennis D. Keiser; Douglas L. Porter; Naoyuki Kisohara

    2008-12-01

    After 30 years of operation, the Experimental Breeder Reactor II (EBR-II) Superheater 710 at Argonne National Laboratory-West (now Idaho National Laboratory) was decommissioned. As part of its post-service examination, four duplex tube sections were removed and Charpy impact testing was performed to characterize the crack arresting ability of nickel-bonded tube interfaces. Scanning electron microscopy (SEM) examination was also performed to characterize and identify changes in bond material microstructure. From room temperature to 400 degrees C, all samples demonstrated ductility and crack-stopping ability similar to that exhibited by beginning-of-life samples. However, at low temperature (-5 degrees C), samples removed from the lower region of the superheater (near the sodium inlet) failed while those from the upper region (near the sodium outlet) did not. SEM analysis revealed that all the tube-tube interfaces showed evidence of iron diffusion into the nickel braze, which resulted in the formation of a multiphase diffusion structure. Yet, significant void formation was only observed in the bond layer of the tubes removed from the lower region. This may be due to a change in the crystal microstructure of one of the phases within the bond layer that occurs in the 350 to 450 degrees C temperature range, which results in a lower density and the formation of porosity. Apparently, only the samples from the higher temperature region were exposed to this transition temperature, and the resulting large voids that developed acted as stress concentrators that led to low-temperature embrittlement and failure of the Charpy impact specimens.

  6. Coiled tubing operations and services. Part 3; Tube technology and capabilities

    SciTech Connect (OSTI)

    Sas-Jaworsky, A.I.I. )

    1992-01-01

    This article offers an overview of developments in commercial coiled tubing for oil wells including continuous coiled pipe manufacturing and production. Pipe behavior under various stresses and forces encountered during typical workover operations is addressed.

  7. Dynamic load balancing of applications

    DOE Patents [OSTI]

    Wheat, Stephen R.

    1997-01-01

    An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated.

  8. Dynamic load balancing of applications

    DOE Patents [OSTI]

    Wheat, S.R.

    1997-05-13

    An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers is disclosed. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated. 13 figs.

  9. High-Power Rf Load

    DOE Patents [OSTI]

    Tantawi, Sami G.; Vlieks, Arnold E.

    1998-09-01

    A compact high-power RF load comprises a series of very low Q resonators, or chokes [16], in a circular waveguide [10]. The sequence of chokes absorb the RF power gradually in a short distance while keeping the bandwidth relatively wide. A polarizer [12] at the input end of the load is provided to convert incoming TE.sub.10 mode signals to circularly polarized TE.sub.11 mode signals. Because the load operates in the circularly polarized mode, the energy is uniformly and efficiently absorbed and the load is more compact than a rectangular load. Using these techniques, a load having a bandwidth of 500 MHz can be produced with an average power dissipation level of 1.5 kW at X-band, and a peak power dissipation of 100 MW. The load can be made from common lossy materials, such as stainless steel, and is less than 15 cm in length. These techniques can also produce loads for use as an alternative to ordinary waveguide loads in small and medium RF accelerators, in radar systems, and in other microwave applications. The design is easily scalable to other RF frequencies and adaptable to the use of other lossy materials.

  10. Libra: Scalable Load Balance Analysis

    Energy Science and Technology Software Center (OSTI)

    2009-09-16

    Libra is a tool for scalable analysis of load balance data from all processes in a parallel application. Libra contains an instrumentation module that collects model data from parallel applications and a parallel compression mechanism that uses distributed wavelet transforms to gather load balance model data in a scalable fashion. Data is output to files, and these files can be viewed in a GUI tool by Libra users. The GUI tool associates particular load balancemore » data with regions for code, emabling users to view the load balance properties of distributed "slices" of their application code.« less

  11. Sandia Wind Turbine Loads Database

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wind Turbine Loads Database - Sandia Energy Energy Search Icon Sandia Home Locations ... Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power ...

  12. Insulated laser tube structure and method of making same

    DOE Patents [OSTI]

    Dittbenner, Gerald R.

    1999-01-01

    An insulated high temperature ceramic laser tube having substantially uniform insulation along the length of the tube is disclosed having particulate ceramic insulation positioned between the outer wall of the ceramic laser tube and the inner surface of tubular ceramic fiber insulation which surrounds the ceramic laser tube. The particulate ceramic insulation is preferably a ceramic capable of sintering to the outer surface of the ceramic laser tube and to the inner surface of the tubular ceramic fiber insulation. The addition of the particulate ceramic insulation to fill all the voids between the ceramic laser tube and the fibrous ceramic insulation permits the laser tube to be operated at a substantially uniform temperature throughout the length of the laser tube.

  13. The Challenge: Improving the Efficiency of a Tube Drawing Bench

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    high-precision, small-diameter stainless steel tubing, conducted an in-house system ... 1 million linear feet of custom stainless steel tubing per month for its customers in the ...

  14. Improving Efficiency of Tube Drawing Bench | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    small-diameter stainless steel tubing, conducted an in-house system performance optimization project to improve the efficiency of its No. 6 tube drawing bench. This four-page...

  15. Modeling coiled tubing velocity strings for gas wells

    SciTech Connect (OSTI)

    Martinez, J.; Martinez, A.

    1995-12-31

    Multiphase flowing pressure and velocity prediction models are necessary to coiled tubing velocity string design. A model used by most of the coiled tubing service companies or manufacturers is reviewed. Guidance is provided for selecting a coiled tubing of the proper size. The steps include: (1) Measured data matching; (2) Fluid property adjustment; (3) Pressure, velocity, and holdup selection; (4) Correlation choice; (5) Coiled tubing selection. A velocity range for the lift of liquid is given.

  16. Target injection methods for inertial fusion energy

    SciTech Connect (OSTI)

    Petzoldt, R.W.; Moir, R.W.

    1994-06-01

    We have studied four methods to inject IFE targets: the gas gun, electrostatic accelerator, induction accelerator, and rail gun. We recommend a gas gun for indirect drive targets because they can support a gas pressure load on one end and can slide along the gun barrel without damage. With the gas gun, the amount of gas required for each target (about 10 to 100 mg) is acceptable; for other types of targets, a sabot would be necessary. A cam and poppet valve arrangement is recommended for gas flow control. An electrostatic accelerator is attractive for use with lightweight spherical direct drive targets. Since there is no physical contact between the target and the injector, there will be no wear of either component during the injection process. An induction accelerator has an advantage of no electrical contact between the target and the injector. Physical contact is not even necessary, so the wear should be minimal. It requires a cylindrical conductive target sleeve which is a substantial added mass. A rail gun is a simpler device than an electrostatic accelerator or induction accelerator. It requires electrical contact between the target and the rails and may have a significant wear rate. The wear in a vacuum could be reduced by use of a solid lubricant such as MoS{sub 2}. The total required accuracy of target injection, tracking and beam pointing of {plus_minus}0.4 mm appears achievable but will require development and experimental verification.

  17. Apparatus for loading shape memory gripper mechanisms

    DOE Patents [OSTI]

    Lee, Abraham P.; Benett, William J.; Schumann, Daniel L.; Krulevitch, Peter A.; Fitch, Joseph P.

    2001-01-01

    A method and apparatus for loading deposit material, such as an embolic coil, into a shape memory polymer (SMP) gripping/release mechanism. The apparatus enables the application of uniform pressure to secure a grip by the SMP mechanism on the deposit material via differential pressure between, for example, vacuum within the SMP mechanism and hydrostatic water pressure on the exterior of the SMP mechanism. The SMP tubing material of the mechanism is heated to above the glass transformation temperature (Tg) while reshaping, and subsequently cooled to below Tg to freeze the shape. The heating and/or cooling may, for example, be provided by the same water applied for pressurization or the heating can be applied by optical fibers packaged to the SMP mechanism for directing a laser beam, for example, thereunto. At a point of use, the deposit material is released from the SMP mechanism by reheating the SMP material to above the temperature Tg whereby it returns to its initial shape. The reheating of the SM material may be carried out by injecting heated fluid (water) through an associated catheter or by optical fibers and an associated beam of laser light, for example.

  18. TWISTED MAGNETIC FLUX TUBES IN THE SOLAR WIND

    SciTech Connect (OSTI)

    Zaqarashvili, Teimuraz V.; Vörös, Zoltán; Narita, Yasuhito; Bruno, Roberto

    2014-03-01

    Magnetic flux tubes in the solar wind can be twisted as they are transported from the solar surface, where the tubes are twisted due to photospheric motions. It is suggested that the twisted magnetic tubes can be detected as the variation of total (thermal+magnetic) pressure during their passage through the observing satellite. We show that the total pressure of several observed twisted tubes resembles the theoretically expected profile. The twist of the isolated magnetic tube may explain the observed abrupt changes of magnetic field direction at tube walls. We have also found some evidence that the flux tube walls can be associated with local heating of the plasma and elevated proton and electron temperatures. For the tubes aligned with the Parker spiral, the twist angle can be estimated from the change of magnetic field direction. Stability analysis of twisted tubes shows that the critical twist angle of the tube with a homogeneous twist is 70°, but the angle can further decrease due to the motion of the tube with respect to the solar wind stream. The tubes with a stronger twist are unstable to the kink instability, therefore they probably cannot reach 1 AU.

  19. Finned Tube With Vortex Generators For A Heat Exchanger.

    DOE Patents [OSTI]

    Sohal, Manohar S.; O'Brien, James E.

    2005-12-20

    A system for and method of manufacturing a finned tube for a heat exchanger is disclosed herein. A continuous fin strip is provided with at one pair of vortex generators. A tube is rotated and linearly displaced while the continuous fin strip with vortex generators is spirally wrapped around the tube.

  20. Finned Tube With Vortex Generators For A Heat Exchanger.

    DOE Patents [OSTI]

    Sohal, Monohar S.; O'Brien, James E.

    2004-09-14

    A system for and method of manufacturing a finned tube for a heat exchanger is disclosed herein. A continuous fin strip is provided with at least one pair of vortex generators. A tube is rotated and linearly displaced while the continuous fin strip with vortex generators is spirally wrapped around the tube.

  1. Spring loaded locator pin assembly

    DOE Patents [OSTI]

    Groll, Todd A.; White, James P.

    1998-01-01

    This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece.

  2. Spring loaded locator pin assembly

    DOE Patents [OSTI]

    Groll, T.A.; White, J.P.

    1998-03-03

    This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece. 5 figs.

  3. Performance investigation of finned tube condensers

    SciTech Connect (OSTI)

    Mathur, G.D.

    1996-12-31

    A computer program has been developed to optimize the performance of finned tube condensers. The developed program is used to predict the thermal and hydrodynamic performance of finned tube condensers. The model is based on a steady-state finite difference model. The correlations for predicting the heat transfer and pressure drop are used from the literature. In this paper, the performance of a condenser of a 2-1/2 ton residential air conditioning system (split type) is optimized. The working fluid used in this investigation is R-22. ASHRAE`s condition A [Outside 95 F DBT/75 F WBT; Inside 80 F/67 F WBT] is used in this investigation. The predicted performance of the condenser is within {+-}5% of the experimental data.

  4. Coupled-cavity drift-tube linac

    DOE Patents [OSTI]

    Billen, James H.

    1996-01-01

    A coupled-cavity drift-tube linac (CCDTL) combines features of the Alvarez drift-tube linac (DTL) and the .pi.-mode coupled-cavity linac (CCL). In one embodiment, each accelerating cavity is a two-cell, 0-mode DTL. The center-to-center distance between accelerating gaps is .beta..lambda., where .lambda. is the free-space wavelength of the resonant mode. Adjacent accelerating cavities have oppositely directed electric fields, alternating in phase by 180 degrees. The chain of cavities operates in a .pi./2 structure mode so the coupling cavities are nominally unexcited. The CCDTL configuration provides an rf structure with high shunt impedance for intermediate velocity charged particles, i.e., particles with energies in the 20-200 MeV range.

  5. Coupled-cavity drift-tube linac

    DOE Patents [OSTI]

    Billen, J.H.

    1996-11-26

    A coupled-cavity drift-tube linac (CCDTL) combines features of the Alvarez drift-tube linac (DTL) and the {pi}-mode coupled-cavity linac (CCL). In one embodiment, each accelerating cavity is a two-cell, 0-mode DTL. The center-to-center distance between accelerating gaps is {beta}{lambda}, where {lambda} is the free-space wavelength of the resonant mode. Adjacent accelerating cavities have oppositely directed electric fields, alternating in phase by 180 degrees. The chain of cavities operates in a {pi}/2 structure mode so the coupling cavities are nominally unexcited. The CCDTL configuration provides an rf structure with high shunt impedance for intermediate velocity charged particles, i.e., particles with energies in the 20-200 MeV range. 5 figs.

  6. Coiled tubing applications for underground gas storage

    SciTech Connect (OSTI)

    Fowler, H.; Holcombe, D.

    1994-12-31

    Technological advances in coiled tubing (CT), CT handling equipment, and application techniques have provided new opportunities for the effective, economic use of CT for gas storage and retrieval. This paper presents a review of the CT capabilities that can be used for improving the performance of gas storage wells and discusses applications that could be performed with CT in the near future. For more than 25 years, coiled tubing has been use as an effective, economic means of performing remedial well services. In response to the demand for better horizontal drilling equipment, the strength and diameter of CT has been increased, while surface equipment and downhole tools have become more sophisticated. CT is also widely used in well servicing after initial completion, especially since declining oil prices have made it imperative that operators find more cost-effective methods of increasing production and reducing maintenance costs. The gas storage industry can effectively take advantage of the many recent advancements in CT technology.

  7. Source Terms for HFIR Beam Tube Shielding Analyses, and a Complete Shielding Analysis of the HB-3 Tube

    SciTech Connect (OSTI)

    Bucholz, J.A.

    2000-07-01

    The High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory is in the midst of a massive upgrade program to enhance experimental facilities. The reactor presently has four horizontal experimental beam tubes, all of which will be replaced or redesigned. The HB-2 beam tube will be enlarged to support more guide tubes, while the HB-4 beam tube will soon include a cold neutron source.

  8. AN APPARATUS FOR MEASURING ANNULAR OFFSET BETWEEN A FIRST METAL TUBE AND A SECOND METAL TUBE SPATIALLY DISPOSED WITHIN THE FIRST TUBE

    DOE Patents [OSTI]

    Spanner, J.C.

    1963-08-01

    An apparatus for measurirg the amount of offset from concentricity between a first metal tube mounted within a second metal tube comprises a first pair of like sensing coils mounted diametrically opposite each other adjacent to the interior of the first tube and a second pair of sensirg coils identical to the first pair of coils mounted diametrically opposite each other adjacent to tue interior surfuce of the first tube and spatinlly displaced 90 degrees from the first pair of sensing coils. An a-c signal at a frequency such that the resultant electromagnetic energy from the sensing coils passes through the first tube and is essentially totally attenuated by the second tube is alternately provided to each pair of coils. Differential measurement of the effective impedance of the sensing coils in each of the pairs gives the amount of offset. (AEC)

  9. Savannah River reactor process water heat exchanger tube structural integrity margin Task Number 92-005-1

    SciTech Connect (OSTI)

    Mertz, G.E.; Barnes, D.M.; Sindelar, R.L.

    1992-02-01

    Twelve process water heat exchangers are designed to remove heat generated in the reactor tank. Each heat exchanger has approximately 9000, 1/2 inch diameter {times} 0.049 inches thick tubes. Minimum structural tubing requirements and the leak rate through postulated tubing defects are developed in this report A comparison of the structural requirements and the defect size calculated to produce leak rates of 0.5 lbs./day demonstrate adequate structural margins against gross tube rupture. Commercial nuclear experience with pressurized water reactor (PWR) steam generator plugging criteria are used for guidance in performing this analysis. It is important to note that the SRS reactors are low energy systems with normal operating pressures of 203 psig at 130{degree}F while the PWR is a high energy system with operating pressures near 2200 psig at 600{degree}F. Clearly the PVM steam generator has loadings which are more severe than the SRS heat exchangers. Consistent with the Regulatory Guide 1.121 criteria both wastage (wall thinning) and cracking are addressed. Structural limits on wall thinning and crack size are developed to preclude gross rupture. ASME Section XI criteria, with the factors of safety recommended by Regulatory Guide 1.121 are used to develop the allowable crack size criteria. Normal operating conditions (pressure, dead weight, and hydraulic drag) are considered with seismic and water hammer accident conditions. Both the wall thinning and crack size criteria are developed for the end-of-evaluation period. Allowances for corrosion, wear, or crack growth have not been included in this analysis Structurally, the tubing is over designed and can tolerate large defects with adequate margins against gross rupture. The structural margins of heat exchanger tubing are evident by contrasting the tubing's structural capacity, per the ASME Code, with its operating conditions/configuration.

  10. Recirculating wedges for metal-vapor plasma tubes

    DOE Patents [OSTI]

    Hall, J.P.; Sawvel, R.M.; Draggoo, V.G.

    1994-06-28

    A metal vapor laser is disclosed that recycles condensed metal located at the terminal ends of a plasma tube back toward the center of the tube. A pair of arcuate wedges are incorporated on the bottom of the plasma tube near the terminal ends. The wedges slope downward toward the center so that condensed metal may be transported under the force of gravity away from the terminal ends. The wedges are curved to fit the plasma tube to thereby avoid forming any gaps within the tube interior. 8 figures.

  11. Tube cutter tool and method of use for coupon removal

    DOE Patents [OSTI]

    Nachbar, Henry D.; Etten, Jr., Marvin P.; Kurowski, Paul A.

    1997-01-01

    A tube cutter tool is insertable into a tube for cutting a coupon from a damaged site on the exterior of the tube. Prior to using the tool, the damaged site is first located from the interior of the tube using a multi-coil pancake eddy current test probe. The damaged site is then marked. A fiber optic probe is used to monitor the subsequent cutting procedure which is performed using a hole saw mounted on the tube cutter tool. Prior to completion of the cutting procedure, a drill in the center of the hole saw is drilled into the coupon to hold it in place.

  12. Recirculating wedges for metal-vapor plasma tubes

    DOE Patents [OSTI]

    Hall, Jerome P. (Livermore, CA); Sawvel, Robert M. (Modesto, CA); Draggoo, Vaughn G. (Livermore, CA)

    1994-01-01

    A metal vapor laser is disclosed that recycles condensed metal located at the terminal ends of a plasma tube back toward the center of the tube. A pair of arcuate wedges are incorporated on the bottom of the plasma tube near the terminal ends. The wedges slope downward toward the center so that condensed metal may be transported under the force of gravity away from the terminal ends. The wedges are curved to fit the plasma tube to thereby avoid forming any gaps within the tube interior.

  13. Tube cutter tool and method of use for coupon removal

    DOE Patents [OSTI]

    Nachbar, H.D.; Etten, M.P. Jr.; Kurowski, P.A.

    1997-05-06

    A tube cutter tool is insertable into a tube for cutting a coupon from a damaged site on the exterior of the tube. Prior to using the tool, the damaged site is first located from the interior of the tube using a multi-coil pancake eddy current test probe. The damaged site is then marked. A fiber optic probe is used to monitor the subsequent cutting procedure which is performed using a hole saw mounted on the tube cutter tool. Prior to completion of the cutting procedure, a drill in the center of the hole saw is drilled into the coupon to hold it in place. 4 figs.

  14. Alloy 400 tube failures by stress corrosion cracking

    SciTech Connect (OSTI)

    Amar, A.S.

    1995-12-01

    A feedwater heater with SB163 Alloy 400 (cold drawn - stress relieved) tubing experienced numerous tube failures and was replaced after of 4.5 years. Failures were attributed to Inter Granular Stress Corrosion Cracking (IGSCC) in the roll transition area. An eddy current test method was developed with EPRI NDE Center technical support to detect the cracks in the tubesheet region. Three tubes were pulled for metallurgical examination. Short axial cracks were found on tube inner surface. Measured crack depths were correlated with the eddy current indications. A large number of tubes were plugged. However, the heater continued to deteriorate rapidly. Potential contributors to IGSCC are discussed.

  15. Segmented lasing tube for high temperature laser assembly

    DOE Patents [OSTI]

    Sawicki, Richard H.; Alger, Terry W.; Finucane, Raymond G.; Hall, Jerome P.

    1996-01-01

    A high temperature laser assembly capable of withstanding operating temperatures in excess of 1500.degree. C. is described comprising a segmented cylindrical ceramic lasing tube having a plurality of cylindrical ceramic lasing tube segments of the same inner and outer diameters non-rigidly joined together in axial alignment; insulation of uniform thickness surround the walls of the ceramic lasing tube; a ceramic casing, preferably of quartz, surrounding the insulation; and a fluid cooled metal jacket surrounds the ceramic casing. In a preferred embodiment, the inner surface of each of the ceramic lasing tube segments are provided with a pair of oppositely spaced grooves in the wall thereof parallel to the center axis of the segmented cylindrical ceramic lasing tube, and both of the grooves and the center axis of the segmented cylindrical ceramic lasing tube lie in a common plane, with the grooves in each ceramic lasing tube segment in circumferential alignment with the grooves in the adjoining ceramic lasing tube segments; and one or more ceramic plates, all lying in a common plane to one another and with the central axis of the segmented ceramic lasing tube, are received in the grooves to provide additional wall area in the segmented ceramic lasing tube for collision and return to ground state of metastable metal atoms within the segmented ceramic lasing tube.

  16. Coiled tubing velocity string hangoff method and apparatus

    SciTech Connect (OSTI)

    Gipson, T.C.

    1991-07-02

    This patent describes a method for hanging off a coiled tube velocity string in an active gas production well tubing run, the run having at least a master valve and a first line valve. It includes installing a hangoff assembly in the production well tubing run between the master valve and the first line valve the hangoff assembly comprising a hangoff head, a second line valve, an upper valve, and a hydraulic packoff valve, the hangoff head further comprising a threaded body member, a slip bowl and a threaded cap; inserting through the hydraulic packoff valve, the upper valve, and the hangoff head, coiled tubing for fluid communication with well gases and fluids in the production well tubing run, the coiled tubing having a first downhole end being open to immediately receive and conduct the gases and fluids; opening gas and fluid communication between the production well tubing run and the open end of the coiled tubing whereby the well gases and fluid may pass up through the coiled tubing, the hangoff head sealing the gases and fluids from passing to the hydraulic packoff valve, the upper valve and the second line valve; further inserting the coiled tubing to a desired depth in the production well tubing run; and rotating the cap of the hangoff head to expose the slip bowl.

  17. Coiled tubing drilling requires economic and technical analyses

    SciTech Connect (OSTI)

    Gary, S.C. )

    1995-02-20

    Field experience has proven that coiled tubing drilling is a technical and economic option on some wells; however, coiled tubing drilling is not the solution to every drilling prospect or production-enhancement job. To determine if coiled tubing drilling is viable, the geographic, technical, and economic aspects of each project must be considered in detail. Generally, with some limitations, coiled tubing drilling is feasible primarily when jointed pipe cannot be used effectively. Also, coiled tubing drilling may be more appropriate because of some special well site requirements, such as environmental regulations requiring less surface disturbance. The paper discusses technical considerations which need to be considered, economic feasibility, limitations of well types (new shallow wells, conventional reentry, through-tubing reentry, and underbalanced drilling), and outlook for further growth in the coiled tubing drilling industry.

  18. Spinning Reserve from Responsive Load

    SciTech Connect (OSTI)

    Kueck, John D; Kirby, Brendan J; Laughner, T; Morris, K

    2009-01-01

    As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host a spinning reserve test. The Tennessee Valley Authority (TVA) supplied real-time metering and monitoring expertise to record total hotel load during both normal operations and testing. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. The load drop was very rapid, essentially as fast as the 2 second metering could detect.

  19. Self-shielding flex-circuit drift tube, drift tube assembly and method of making

    DOE Patents [OSTI]

    Jones, David Alexander

    2016-04-26

    The present disclosure is directed to an ion mobility drift tube fabricated using flex-circuit technology in which every other drift electrode is on a different layer of the flex-circuit and each drift electrode partially overlaps the adjacent electrodes on the other layer. This results in a self-shielding effect where the drift electrodes themselves shield the interior of the drift tube from unwanted electro-magnetic noise. In addition, this drift tube can be manufactured with an integral flex-heater for temperature control. This design will significantly improve the noise immunity, size, weight, and power requirements of hand-held ion mobility systems such as those used for explosive detection.

  20. Sandia Wind Turbine Loads Database

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    The Sandia Wind Turbine Loads Database is divided into six files, each corresponding to approximately 16 years of simulation. The files are text files with data in columnar format. The 424MB zipped file containing six data files can be downloaded by the public. The files simulate 10-minute maximum loads for the NREL 5MW wind turbine. The details of the loads simulations can be found in the paper: Decades of Wind Turbine Loads Simulations, M. Barone, J. Paquette, B. Resor, and L. Manuel, AIAA2012-1288 (3.69MB PDF). Note that the site-average wind speed is 10 m/s (class I-B), not the 8.5 m/s reported in the paper.

  1. Sandia Wind Turbine Loads Database

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    The Sandia Wind Turbine Loads Database is divided into six files, each corresponding to approximately 16 years of simulation. The files are text files with data in columnar format. The 424MB zipped file containing six data files can be downloaded by the public. The files simulate 10-minute maximum loads for the NREL 5MW wind turbine. The details of the loads simulations can be found in the paper: “Decades of Wind Turbine Loads Simulations”, M. Barone, J. Paquette, B. Resor, and L. Manuel, AIAA2012-1288 (3.69MB PDF). Note that the site-average wind speed is 10 m/s (class I-B), not the 8.5 m/s reported in the paper.

  2. Structural assessment of accident loads

    SciTech Connect (OSTI)

    Wagenblast, G.R., Westinghouse Hanford

    1996-05-28

    Structural assessments were made for specific accident loads for specific catch, receiver, and storage tanks. The evaluation herein represents level-of-effort order-of-magnitude estimates of limiting loads that would lead to collapse or rupture of the tank and unmitigated loss of confinement for the waste. Structural capacities were established using failure criteria. Compliance with codes such as ACI, ASCE, ASME, RCRA, UBC, WAC, and DOE Orders was `NOT` maintained. Normal code practice is to prevent failure with margins consistent with expected variations in loads and strengths and confidence in analysis techniques. The evaluation herein represent estimates of code limits without code load factors or code strength reduction factors, and loading beyond such a limit is considered as an onset of some failure mode. The exact nature of the failure mode and its relation to a safe condition is a judgment of the analyst. Consequently, these `RESULTS SHALL NOT BE USED TO ESTABLISH OPERATING OR SAFETY LOAD LIMITS FOR THESE TANKS`.

  3. Fuel cell tubes and method of making same

    DOE Patents [OSTI]

    Borglum, Brian P.

    1999-11-30

    A method of manufacturing porous ceramic tubes for fuel cells with improved properties and higher manufacturing yield is disclosed. The method involves extruding a closed end fuel cell tube, such as an air electrode of a solid oxide fuel cell, in which the closed end also functions as the sintering support. The resultant fuel cell tube has a superior porosity distribution which allows improved diffusion of oxygen at the closed end of the tube during operation of the fuel cell. Because this region has the highest current density, performance enhancement and improved reliability of the fuel cell tube result. Furthermore, the higher manufacturing yield associated with the present method decreases the overall fuel cell cost. A method of manufacturing porous ceramic tubes for fuel cells with improved properties and higher manufacturing yield is disclosed. The method involves extruding a closed end fuel cell tube, such as an air electrode of a solid oxide fuel cell, in which the closed end also functions as the sintering support. The resultant fuel cell tube has a superior porosity distribution which allows improved diffusion of oxygen at the closed end of the tube during operation of the fuel cell. Because this region has the highest current density, performance enhancement and improved reliability of the fuel cell tube result. Furthermore, the higher manufacturing yield associated with the present method decreases the overall fuel cell cost.

  4. Life assessment of superheater/reheater tubes in fossil boilers

    SciTech Connect (OSTI)

    Viswanathan, R.; Gehl, S.; Paterson, S.R.; Grunloh, H.

    1995-08-01

    Creep rupture failure of superheater(SH)/-reheater(RH) tubes is a major cause of forced outages of power boilers. A methodology developed recently by EPRI researchers has helped utilities make more informed run/replace decisions for tubes by judiciously combining calculational, nondestructive and destructive evaluations. In this methodology, the tubes/tube assemblies at risk are identified by ultrasonically measuring the thickest steamside oxide scale and thinnest wall thickness in the tubes. The remaining life of each tube/tube assemblies is predicted using a computer code known as TUBELIFE, thus achieving a further level of focus on the tubes/assemblies in the highest risk category. Sacrificial tube samples are then removed from the select locations and subjected to laboratory metallurgical evaluation and isostress rupture testing to refine the remaining life estimates. Research has further refined this methodology by validating the ultrasonic technique for scale measurement, identifying the appropriate stress formula and oxide growth laws and evaluating the limitations of creep damage summation rules and isostress rupture test procedures. This paper provides an overview of the research in the field, and establish a road map for assessing the remaining life of SH/RH tubes.

  5. Life assessment of superheater/reheater tubes in fossil boilers

    SciTech Connect (OSTI)

    Viswanathan, R.; Gehl, S. ); Paterson, S.R. ); Grunloh, H. )

    1994-02-01

    Creep rupture failure of superheater (SH)/reheater (RH) tubes is a major cause of forced outages of power boilers. A methodology developed recently by EPRI and its contractors has helped utilities make more informed run/replace decisions for tubes by judiciously combining calculational, nondestructive, and destructive evaluations. In this methodology, the tubes/tube assemblies at risk are identified by ultrasonically measuring the thickest steamside oxide scale and thinnest wall thickness in the tubes. The remaining life of each tube/tube assembly is predicted using a computer code known as TUBELIFE, thus achieving a further level of focus on the tubes/assemblies in the highest risk'' category. Sacrificial tube samples are then removed from the select locations and subjected to laboratory metallurgical evaluation and isostress rupture testing to refine the remaining life estimates. Research has further refined this methodology by validating the ultrasonic technique for scale measurement, identifying the appropriate stress formula and oxide growths laws and evaluating the limitations of creep damage summation rules and isostress rupture test procedures. This paper provides an overview of the research in the field, and establishes a road map for assessing the remaining life of SH/RH tubes.

  6. Logging of subterranean wells using coiled tubing

    SciTech Connect (OSTI)

    Pilla, J.

    1991-01-15

    This patent describes an apparatus for production logging of a well utilizing artificial lift in a wellbore. It comprises: coiled tubing extending into the wellbore having wireline electrical cable passing through a central bore thereof and having a remote end within the wellbore which end is connected to gas injector means. The wireline cable passing through the gas injector means to a flexible electrically conductive support spacer having an end portion remote from the gas injector means and logging means connected to the end portion of the support spacer.

  7. Developments in coiled tubing BOP ram design

    SciTech Connect (OSTI)

    Palmer, R.; Newman, K.; Reaper, A.

    1995-12-31

    Significant technical improvements have been made recently in the design of coiled tubing (CT) blowout preventer (BOP) shear and slip rams. This technology is constantly being enhanced and refined as the CT service industry continues to mature and new operational demands are placed on the CT pressure control equipment. Larger CT sizes require better BOP shearing capabilities. Advancements in the understanding of CT fatigue life have caused the life reducing affects of the slip ram markings on the pipe to be examined. This paper explores the circumstances that have precipitated these improvements, and the research and development methods involved in developing better BOP rams.

  8. Sound Coiled-Tubing Drilling Practices

    SciTech Connect (OSTI)

    Williams, Thomas; Deskins, Greg; Ward, Stephen L.; Hightower, Mel

    2001-09-30

    This Coiled-Tubing Drilling (CTD) Sound Practices Manual provides tools needed by CTD engineers and supervisors to plan, design and perform safe, successful CTD operations. As emphasized throughout, both careful planning and attention to detail are mandatory for success. A bibliography of many useful CTD references is presented in Chapter 6. This manual is organized according to three processes: 1) Pre-Job Planning Process, 2) Operations Execution Process, and 3) Post-Job Review Process. Each is discussed in a logical and sequential format.

  9. Polarized internal target apparatus

    DOE Patents [OSTI]

    Holt, Roy J.

    1986-01-01

    A polarized internal target apparatus with a polarized gas target of improved polarization and density achieved by mixing target gas atoms with a small amount of alkali metal gas atoms, and passing a high intensity polarized light source into the mixture to cause the alkali metal gas atoms to become polarized which interact in spin exchange collisions with target gas atoms yielding polarized target gas atoms.

  10. Polarized internal target apparatus

    DOE Patents [OSTI]

    Holt, R.J.

    1984-10-10

    A polarized internal target apparatus with a polarized gas target of improved polarization and density (achieved by mixing target gas atoms with a small amount of alkali metal gas atoms, and passing a high intensity polarized light source into the mixture to cause the alkali metal gas atoms to become polarized which interact in spin exchange collisions with target gas atoms yielding polarized target gas atoms) is described.

  11. Electrically charged targets

    DOE Patents [OSTI]

    Goodman, Ronald K.; Hunt, Angus L.

    1984-01-01

    Electrically chargeable laser targets and method for forming such charged targets in order to improve their guidance along a predetermined desired trajectory. This is accomplished by the incorporation of a small amount of an additive to the target material which will increase the electrical conductivity thereof, and thereby enhance the charge placed upon the target material for guidance thereof by electrostatic or magnetic steering mechanisms, without adversely affecting the target when illuminated by laser energy.

  12. The effects of load drop, uniform load and concentrated loads on waste tanks

    SciTech Connect (OSTI)

    Marusich, R.M., Westinghouse Hanford

    1996-09-06

    This document provides the supporting calculations performed by others specifically for the TWRS FSAR and more detailed summaries of the important references issued in the past regarding the effects of various loads.

  13. The effects of load drop, uniform load and concentrated loads on waste tanks

    SciTech Connect (OSTI)

    Marusich, R.M.

    1996-09-27

    This document provides the supporting calculations performed by others specifically for the TWRS FSAR and more detailed summaries of the important references issued in the past regarding the effects of various loads.

  14. building load | OpenEI Community

    Open Energy Info (EERE)

    building load Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 13:03 Commercial and Residential Hourly Load Data Now Available on OpenEI building load...

  15. load data | OpenEI Community

    Open Energy Info (EERE)

    load data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI building load building...

  16. electric load data | OpenEI Community

    Open Energy Info (EERE)

    electric load data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI building load...

  17. building load data | OpenEI Community

    Open Energy Info (EERE)

    building load data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI building load...

  18. A gas-loading system for LANL two-stage gas guns

    SciTech Connect (OSTI)

    Gibson, Lloyd Lee; Bartram, Brian Douglas; Dattelbaum, Dana Mcgraw; Lang, John Michael; Morris, John Scott

    2015-09-01

    A novel gas loading system was designed for the specific application of remotely loading high purity gases into targets for gas-gun driven plate impact experiments. The high purity gases are loaded into well-defined target configurations to obtain Hugoniot states in the gas phase at greater than ambient pressures.The small volume of the gas samples is challenging, as slight changing in the ambient temperature result in measurable pressure changes. Therefore, the ability to load a gas gun target and continually monitor the sample pressure prior to firing provides the most stable and reliable target fielding approach. We present the design and evaluation of a gas loading system built for the LANL 50 mm bore two-stage light gas gun. Targets for the gun are made of 6061 Al or OFHC Cu, and assembled to form a gas containment cell with a volume of approximately 1.38 cc. The compatibility of materials was a major consideration in the design of the system, particularly for its use with corrosive gases. Piping and valves are stainless steel with wetted seals made from Kalrez® and Teflon®. Preliminary testing was completed to ensure proper flow rate and that the proper safety controls were in place. The system has been used to successfully load Ar, Kr, Xe, and anhydrous ammonia with purities of up to 99.999 percent. The design of the system and example data from the plate impact experiments will be shown.

  19. Coiled tubing as initial production tubing: An overview of case histories

    SciTech Connect (OSTI)

    Nirider, H.L.; Snider, P.M.; Walsh, K.D.; Williams, J.D.; Cordera, J.R.

    1995-05-01

    From Jan. 1993 through Feb. 1995 Marathon Oil Co. completed 23 newly drilled gas wells with coiled tubing as the initial production string. This paper reviews operational aspects of representative jobs, summarizes areas where improvements in equipment and technique were implemented, and addresses cost and productivity benefits of rigless completions. A summary of lessons learned is also included.

  20. ALT-3 Target & CMU Version 4

    SciTech Connect (OSTI)

    Griego, Jeffrey R; Atchison, Walter L.; Holtkamp, David; Oro, David M.; Reinovsky, Robert E.; Rousculp, Christopher L.; Tabaka, Leonard J.

    2012-06-11

    The third Advance Liner Technology (ALT-3) experiment is the next in a long tradition of collaborations between LANL and RFNC/VNIIEF in high-explosive pulsed-power. Here a VNIIEF provided Disk Explosive Magnetic Generator (DEMG) will drive a LANL provided experimental load and diagnostic package. The objective of the experiment is to explore the use of a cylindrical liner-ontarget in tera-Pascal equation of state measurement. This presentation will discuss version 4 of the experimental target and central measuring unit (CMU) along with R & D already performed in fabrication of the target.

  1. Coiled tubing 1994 update: Expanding applications

    SciTech Connect (OSTI)

    Teel, M.E.

    1994-06-01

    The coiled tubing (CT) resurgence, which began in late 1989 shows little sign of moderating in spite of lower oil and gas prices. In fact, this so-called revolution continues to expand into major new services and applications. CT units are replacing workover rigs and snubbing units in some areas and have recently started to replace drilling rigs even outside Alaska's North Slope Prudhoe Bay field. Activity is reaching record levels in many areas. Although drilling, completions and flowlines generate a lot of interest, these are currently only a small part of total CT business. About 75% of activity is split evenly between nitrogen, acidizing and cleanouts. The other 25% includes newer services like cementing, fishing, sliding sleeves, logging, underreaming to remove scale or cement and drilling. CT is used to drill slimholes and reentry drainholes up to 6 1/8-in. CT has been used as casing and more casing applications are planned. CT ODs to 3 1/2-in. are produced and 4 1/2-in. OD CT production is scheduled later this year. Larger ODs make CT feasible for replacing conventional jointed tubing and welded flowlines.

  2. New coiled tubing jet cleaning system reduces costs

    SciTech Connect (OSTI)

    Cobb, C.C.; Zublin, C.W.

    1985-11-01

    This paper describes Chevron's water blsting system, called Hyperclean, which uses N80 tubing with a special high-pressure power swivel to supply rotation connected via jointed tubing to a replaceable jet stack. One licensee was able to develop the system into a more practical field form and has had good success in in situ liner perforation and slot cleaning. The Hyperclean system is effective, but limited to wells where the production tubing's ID is large enough to allow the collars on the system's 1 1/4-in. tubing easy and safe passage. If smaller tubing is in the well, the tubing must be removed before the Hyperclean tools are lowered into the well.

  3. Prediction of residual stress field in mechanically expanded 0.750 inch diameter steam generator tube plugs. Part 1: 2-D solution

    SciTech Connect (OSTI)

    Williams, D.K.

    1996-12-01

    One of the most formidable classes of problems that arises in the commercial nuclear power industry is the determination of the residual stress field in steam generator tubes. As early as 1983, it was reported that primary water stress corrosion cracking (PWSCC) of Alloy 600 steam generator tubes had occurred at a low frequency. The degradation of steam generator tubing by PWSCC has resulted in unplanned nuclear plant outages and costly repair operations such as tube plugging and eventually steam generator replacement. Although the previous discussion centered around the PWSCC of the Inconel 600 tubes, the repair plugs which are intended to isolate the damaged tubes from the primary system, have also begun to show similar types of cracking in the rolled transitions. Plug severance is highly undesirable in the nuclear plant because the primary-to-secondary barrier would then be voided and radioactive fluid would escape to the non-radioactive feedwater system. At the present time, although the tube problems have been discussed extensively in the literature roll plugs and their associated SCC have yet to be fully addressed. In addition, roll plus present a different set of loads, expansion regions, discontinuities, and displacement boundary conditions to be analyzed. The method of solution to the subject roll expansion problem employs the use of a general purpose finite element program to mathematically simulate the expansion process. The hydraulic expansion simulation is accomplished by matching the final displacements of an installed plug for which field measurements are available. Because of the symmetry which exists in the geometry and loading, this problem is modeled and analyzed as an axisymmetric problem. The resulting stress field throughout the plug, and in particular, in the rolled transition region, is calculated.

  4. Laser Driven Dynamic Loading of Condensed Matter

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laser Driven Dynamic Loading of Condensed Matter Laser Driven Dynamic Loading of Condensed Matter Advanced diagnostics of experiments covering many orders of magnitude in strain ...

  5. Self-aligning biaxial load frame

    DOE Patents [OSTI]

    Ward, Michael B.; Epstein, Jonathan S.; Lloyd, W. Randolph

    1994-01-01

    An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed crosshead, and by alignment and linear motion elements of one load assembly relative to the load frame.

  6. Self-aligning biaxial load frame

    DOE Patents [OSTI]

    Ward, M.B.; Epstein, J.S.; Lloyd, W.R.

    1994-01-18

    An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed cross head, and by alignment and linear motion elements of one load assembly relative to the load frame. 3 figures.

  7. Load Participation in Ancillary Services Workshop Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    controls on the load-side is growing. Driven by improved and widely available communications systems, load participation is becoming easier and more reliable; and there...

  8. dc-plasma-sprayed electronic-tube device

    DOE Patents [OSTI]

    Meek, T.T.

    1982-01-29

    An electronic tube and associated circuitry which is produced by dc plasma arc spraying techniques is described. The process is carried out in a single step automated process whereby both active and passive devices are produced at very low cost. The circuitry is extremely reliable and is capable of functioning in both high radiation and high temperature environments. The size of the electronic tubes produced are more than an order of magnitude smaller than conventional electronic tubes.

  9. Magnetically attached sputter targets

    DOE Patents [OSTI]

    Makowiecki, D.M.; McKernan, M.A.

    1994-02-15

    An improved method and assembly for attaching sputtering targets to cathode assemblies of sputtering systems which includes a magnetically permeable material is described. The magnetically permeable material is imbedded in a target base that is brazed, welded, or soldered to the sputter target, or is mechanically retained in the target material. Target attachment to the cathode is achieved by virtue of the permanent magnets and/or the pole pieces in the cathode assembly that create magnetic flux lines adjacent to the backing plate, which strongly attract the magnetically permeable material in the target assembly. 11 figures.

  10. Method Of Making Closed End Ceramic Fuel Cell Tubes

    DOE Patents [OSTI]

    Borglum, Brian P.

    2002-04-30

    A method of manufacturing closed end ceramic fuel cell tubes with improved properties and higher manufacturing yield is disclosed. The method involves bonding an unfired cap to a hollow unfired tube to form a compound joint. The assembly is then fired to net shape without subsequent machining. The resultant closed end tube is superior in that it provides a leak-tight seal and its porosity is substantially identical to that of the tube wall. The higher manufacturing yield associated with the present method decreases overall fuel cell cost significantly.

  11. Improved Grooving Tool for Tubing - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Tubing Sandia National Laboratories Contact SNL About This Technology Publications: PDF Document Publication Market Sheet (746 KB) Technology Marketing SummarySandia has...

  12. Short-Pulse Beam Transport Tube - Laboratory for Laser Energetics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pulse Beam Transport Tube - Laboratory for Laser Energetics Laboratory for Laser Energetics Logo Search Home Around the Lab Past Issues Past Quick Shots About Office of the ...

  13. Penetrameter positioner for bore-side radiography of tubes

    DOE Patents [OSTI]

    Davis, Earl V. (Oak Ridge, TN); Foster, Billy E. (Oak Ridge, TN)

    1983-01-01

    A positioner is provided for placing plaque or wire penetrameters, as used in radiographic inspection, in close proximity with the inner wall of tubing at any desired location along the tubing. The positioner head carrying the penetrameter is inflatable whereby it is positioned in the deflated condition, inflated to place the penetrameter against a weld to be inspected in the tubing wall, and then deflated during removal. If desired, the penetrameter holder may be used to center the radiographic source on the axis of the tube.

  14. Working session 3: Tubing integrity Cueto-Felgueroso, C. [Tecnatom...

    Office of Scientific and Technical Information (OSTI)

    Tecnatom, S.A., San Sebastian de los Reyes, Madrid (Spain); Strosnider, J. NRC, Washington, DC (United States) 21 NUCLEAR POWER REACTORS AND ASSOCIATED PLANTS; TUBES;...

  15. Simple method for elimination of theromoacoustic oscillations in cryogenic tubes

    SciTech Connect (OSTI)

    Gorbachev, S.P.; Korolev, A.V.; Sysoev, V.A.

    1986-08-01

    The authors show that thermoacoustic oscillations of gas in cryogenic tubes can be eliminated by changing their length. Geometric dimensions that do not produce oscillations are given.

  16. Penetrameter positioner for bore-side radiography of tubes

    DOE Patents [OSTI]

    Davis, E.V.; Foster, B.E.

    1980-02-05

    A positioner is provided for placing plaque or wire penetrameters, as used in radiographic inspection, in close proximity with the inner wall of tubing at any desired location along the tubing. The positioner head carrying the penetrameter is inflatable whereby it is positioned in tte deflated condition, inflated to place the penetrameter against a weld to be inspected in the tubing wall, and then deflated during removal. If desired, the penetrameter holder may be used to center the radiographic source on the axis of the tube.

  17. Coiled tubing used for slim hole re-entry

    SciTech Connect (OSTI)

    Traonmilin, E. ); Newman, K. )

    1992-02-17

    A coiled tubing unit with slim hole tools successfully re-entered and cored an existing Elf Aquitaine vertical well in the Paris basin in France. This experiment proved that coiled tubing could be used to drill, core, and test a slim hole well. Elf Aquitaine studied the use of coiled tubing for drilling inexpensive exploration wells in the Paris basin. As a result of this study, Elf believed that coiled tubing exploration drilling could significantly reduce exploration costs. This paper reports on a number of questions raised by this study: Can coiled tubing be used effectively to drill slim open hole How would the drilling rate compare with that of a conventional drilling rig If the rate were too slow, coiled tubing might not be economical. Can a straight vertical well be drilled Coiled tubing pipe has a residual curvature from bending over the reel and gooseneck. Will this curvature make it impossible to drill straight Can the coiled tubing also be used to take cores Once the hole is drilled, can it be tested with coiled tubing

  18. Jiangsu Yizheng Electron Tube Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Name: Jiangsu Yizheng Electron Tube Co.,Ltd Place: Jiangsu Province, China Product: Energy saving high pressure sodium (HPS) light manufacturer References: Jiangsu Yizheng Electron...

  19. Bore tube assembly for steam cooling a turbine rotor

    DOE Patents [OSTI]

    DeStefano, Thomas Daniel (Ballston Lake, NY); Wilson, Ian David (Clifton Park, NY)

    2002-01-01

    An axial bore tube assembly for a turbine is provided to supply cooling steam to hot gas components of the turbine wheels and return the spent cooling steam. A pair of inner and outer tubes define a steam supply passage concentric about an inner return passage. The forward ends of the tubes communicate with an end cap assembly having sets of peripheral holes communicating with first and second sets of radial tubes whereby cooling steam from the concentric passage is supplied through the end cap holes to radial tubes for cooling the buckets and return steam from the buckets is provided through the second set of radial tubes through a second set of openings of the end cap into the coaxial return passage. A radial-to-axial flow transitioning device, including anti-swirling vanes is provided in the end cap. A strut ring adjacent the aft end of the bore tube assembly permits axial and radial thermal expansion of the inner tube relative to the outer tube.

  20. Metal wastage analysis of carbon steel tubes in FBC environment

    SciTech Connect (OSTI)

    Sethi, V.K.; Puentes, E. ); Natesan, K. )

    1989-01-01

    The TVA 20-MW AFBC Pilot Plant located near Paducah, Kentucky began operations in March 1982, and it operated with the same in-bed evaporator tubes (tube bundle B1) for {approximately}13,625 h through the end of 1985. During January-February 1986, the evaporator tubes were removed to test a new tube bundle configuration (tube bundle C1). After only a short period of operation, tube diameter measurements show that tube wastage rates for bundle C1 were almost an order of magnitude larger than those recorded for B1. Although several other changes could have been responsible for this increase, the consensus at the TVA was that the increase probably occurred because the pilot plant switched coals from a low chlorine (0.02%) to a high chlorine ({approximately}0.30%) KY No. 9 coal. In order to determine the validity of the role of chlorine in increasing the tube wastage, several tube sections were cut out from the plant and analyzed. The results of the chemical and metallographic examination are reported.

  1. Assembly and method for testing the integrity of stuffing tubes

    DOE Patents [OSTI]

    Morrison, Edward Francis

    1997-01-01

    A stuffing tube integrity checking assembly includes first and second annular seals, with each seal adapted to be positioned about a stuffing tube penetration component. An annular inflation bladder is provided, the bladder having a slot extending longitudinally therealong and including a separator for sealing the slot. A first valve is in fluid communication with the bladder for introducing pressurized fluid to the space defined by the bladder when mounted about the tube. First and second releasible clamps are provided. Each clamp assembly is positioned about the bladder for securing the bladder to one of the seals for thereby establishing a fluid-tight chamber about the tube.

  2. Assembly and method for testing the integrity of stuffing tubes

    DOE Patents [OSTI]

    Morrison, E.F.

    1997-08-26

    A stuffing tube integrity checking assembly includes first and second annular seals, with each seal adapted to be positioned about a stuffing tube penetration component. An annular inflation bladder is provided, the bladder having a slot extending longitudinally there along and including a separator for sealing the slot. A first valve is in fluid communication with the bladder for introducing pressurized fluid to the space defined by the bladder when mounted about the tube. First and second releasible clamps are provided. Each clamp assembly is positioned about the bladder for securing the bladder to one of the seals for thereby establishing a fluid-tight chamber about the tube. 5 figs.

  3. Effect of shell drilling stiffness on response calculations of rectangular plates and tubes of rectangular cross-section under compression.

    SciTech Connect (OSTI)

    Gorman, Jhana; Hales, Jason Dean; Corona, Edmundo

    2010-05-01

    This report considers the calculation of the quasi-static nonlinear response of rectangular flat plates and tubes of rectangular cross-section subjected to compressive loads using quadrilateralshell finite element models. The principal objective is to assess the effect that the shell drilling stiffness parameter has on the calculated results. The calculated collapse load of elastic-plastic tubes of rectangular cross-section is of particular interest here. The drilling stiffness factor specifies the amount of artificial stiffness that is given to the shell element drilling Degree of freedom (rotation normal to the plane of the element). The element formulation has no stiffness for this degree of freedom, and this can lead to numerical difficulties. The results indicate that in the problems considered it is necessary to add a small amount of drilling tiffness to obtain converged results when using both implicit quasi-statics or explicit dynamics methods. The report concludes with a parametric study of the imperfection sensitivity of the calculated responses of the elastic-plastic tubes with rectangular cross-section.

  4. Load Leveling Battery System Costs

    Energy Science and Technology Software Center (OSTI)

    1994-10-12

    SYSPLAN evaluates capital investment in customer side of the meter load leveling battery systems. Such systems reduce the customer's monthly electrical demand charge by reducing the maximum power load supplied by the utility during the customer's peak demand. System equipment consists of a large array of batteries, a current converter, and balance of plant equipment and facilities required to support the battery and converter system. The system is installed on the customer's side of themore » meter and controlled and operated by the customer. Its economic feasibility depends largely on the customer's load profile. Load shape requirements, utility rate structures, and battery equipment cost and performance data serve as bases for determining whether a load leveling battery system is economically feasible for a particular installation. Life-cycle costs for system hardware include all costs associated with the purchase, installation, and operation of battery, converter, and balance of plant facilities and equipment. The SYSPLAN spreadsheet software is specifically designed to evaluate these costs and the reduced demand charge benefits; it completes a 20 year period life cycle cost analysis based on the battery system description and cost data. A built-in sensitivity analysis routine is also included for key battery cost parameters. The life cycle cost analysis spreadsheet is augmented by a system sizing routine to help users identify load leveling system size requirements for their facilities. The optional XSIZE system sizing spreadsheet which is included can be used to identify a range of battery system sizes that might be economically attractive. XSIZE output consisting of system operating requirements can then be passed by the temporary file SIZE to the main SYSPLAN spreadsheet.« less

  5. Glass heat pipe evacuated tube solar collector

    DOE Patents [OSTI]

    McConnell, Robert D.; Vansant, James H.

    1984-01-01

    A glass heat pipe is adapted for use as a solar energy absorber in an evacuated tube solar collector and for transferring the absorbed solar energy to a working fluid medium or heat sink for storage or practical use. A capillary wick is formed of granular glass particles fused together by heat on the inside surface of the heat pipe with a water glass binder solution to enhance capillary drive distribution of the thermal transfer fluid in the heat pipe throughout the entire inside surface of the evaporator portion of the heat pipe. Selective coatings are used on the heat pipe surface to maximize solar absorption and minimize energy radiation, and the glass wick can alternatively be fabricated with granular particles of black glass or obsidian.

  6. Coiled tubing sidetrack: Slaughter Field case history

    SciTech Connect (OSTI)

    Hightower, C.M.; Blount, C.G.; Ward, S.L.; Martin, R.F.; Cantwell, D.L.; Ackers, M.J.

    1995-03-01

    The paper describes the successful sidetrack of an oil well in the Slaughter Field in West Texas using coiled tubing (CT). Several first-time CT operations performed during this workover include: setting a whipstock in casing on CT; cutting a window with CT; using mud pulse measurement-while-drilling (MWD) with CT in a real well; use of a fluid-operated orientation tool for in-hole toolface changes; successful use of an autodriller to maintain weight on bit while drilling. Directional control of the sidetracked hole proved to be ineffective due to a surface software problem. The resultant wellbore was not horizontal as planned, but instead closely paralleled the original well for much of its length. However, the previously non-productive well flowed 1,000 barrels of fluid per day (BFPD) from the sidetrack following the workover.

  7. MULTI-ELECTRODE TUBE PULSE MEMORY CIRCUIT

    DOE Patents [OSTI]

    Gundlach, J.C.; Reeves, J.B.

    1958-05-20

    Control circuits are described for pulse memory devices for scalers and the like, and more particularly to a driving or energizing circuit for a polycathode gaseous discharge tube having an elongated anode and a successive series of cathodes spaced opposite the anode along its length. The circuit is so arranged as to utilize an arc discharge between the anode and a cathode to count a series of pulses. Upon application of an input pulse the discharge is made to occur between the anode and the next successive cathode, and an output pulse is produced when a particular subsequent cathode is reached. The circuit means for transfering the discharge by altering the anode potential and potential of the cathodes and interconnecting the cathodes constitutes the novel aspects of the invention. A low response time and reduced number of circuit components are the practical advantages of the described circuit.

  8. Flash photolysis-shock tube studies

    SciTech Connect (OSTI)

    Michael, J.V.

    1993-12-01

    Even though this project in the past has concentrated on the measurement of thermal bimolecular reactions of atomic species with stable molecules by the flash or laser photolysis-shock tube (FP- or LP-ST) method using atomic resonance absorption spectrometry (ARAS) as the diagnostic technique, during the past year the authors have concentrated on studies of the thermal decompositions of selected chlorocarbon molecules. These studies are necessary if the degradation of chlorine containing organic molecules by incineration are to be understood at the molecular level. Clearly, destruction of these molecules will not only involve abstraction reactions, when possible, but also thermal decomposition followed by secondary reactions of the initially formed atoms and radicals. Studies on the thermal decomposition of CH{sub 3}Cl are complete, and the curve-of-growth for Cl-atom atomic resonance absorption has been determined. The new thermal decomposition studies are similar to those already reported for CH{sub 3}Cl.

  9. Carbon dioxide laser irradiation of bacterial targets in vitro

    SciTech Connect (OSTI)

    Byrne, P.O.; Sisson, P.R.; Oliver, P.D.; Ingham, H.R.

    1987-05-01

    Agar targets seeded with Escherichia coli and Staphylococcus aureus in roll tubes simulating the vaginal vault were irradiated with a CO/sub 2/ laser at various power densities and durations. Viable bacteria were detected in the plume emissions in all instances. Staphylococcus aureus was found to be more resistant to the thermal effects of lasing than E. coli. This suggests that CO/sub 2/ irradiation of cervical lesions could disseminate viable particles which may be a hazard for patients and operators.

  10. High Power Cryogenic Targets

    SciTech Connect (OSTI)

    Gregory Smith

    2011-08-01

    The development of high power cryogenic targets for use in parity violating electron scattering has been a crucial ingredient in the success of those experiments. As we chase the precision frontier, the demands and requirements for these targets have grown accordingly. We discuss the state of the art, and describe recent developments and strategies in the design of the next generation of these targets.

  11. PRB rail loadings shatter record

    SciTech Connect (OSTI)

    Buchsbaum, L.

    2008-09-15

    Rail transport of coal in the Powder River Basin has expanded, with a record 2,197 trains loaded in a month. Arch Coal's Thunder basin mining complex has expanded by literally bridging the joint line railway. The dry fork mine has also celebrated its safety achievements. 4 photos.

  12. Aquifer Sampling Tube Results for Fiscal Year 2003

    SciTech Connect (OSTI)

    Hartman, Mary J.; Peterson, Robert E.

    2003-10-27

    This report presents and discusses results of the fiscal year 2003 sampling event associated with aquifer tubes along the Columbia River in the northern Hanford Site. Aquifer tube data help define the extent of groundwater contamination near the river, determine vertical variations in contamination, monitor the performance of interim remedial actions near the river, and support impact studies.

  13. Variable-energy drift-tube linear accelerator

    DOE Patents [OSTI]

    Swenson, D.A.; Boyd, T.J. Jr.; Potter, J.M.; Stovall, J.E.

    A linear accelerator system includes a plurality of post-coupled drift-tubes wherein each post coupler is bistably positionable to either of two positions which result in different field distributions. With binary control over a plurality of post couplers, a significant accumlative effect in the resulting field distribution is achieved yielding a variable-energy drift-tube linear accelerator.

  14. Variable-energy drift-tube linear accelerator

    DOE Patents [OSTI]

    Swenson, Donald A.; Boyd, Jr., Thomas J.; Potter, James M.; Stovall, James E.

    1984-01-01

    A linear accelerator system includes a plurality of post-coupled drift-tubes wherein each post coupler is bistably positionable to either of two positions which result in different field distributions. With binary control over a plurality of post couplers, a significant accumlative effect in the resulting field distribution is achieved yielding a variable-energy drift-tube linear accelerator.

  15. Drift tube suspension for high intensity linear accelerators

    DOE Patents [OSTI]

    Liska, Donald J.; Schamaun, Roger G.; Clark, Donald C.; Potter, R. Christopher; Frank, Joseph A.

    1982-01-01

    The disclosure relates to a drift tube suspension for high intensity linear accelerators. The system comprises a series of box-sections girders independently adjustably mounted on a linear accelerator. A plurality of drift tube holding stems are individually adjustably mounted on each girder.

  16. Nondestructive evaluation of new coiled tubing and pipe

    SciTech Connect (OSTI)

    Stanley, R.K.

    1996-09-01

    The nondestructive testing (NDT) and evaluation (NDE) of coiled tubing and pipe during manufacture has not previously been described. This paper outlines the NDE methods employed during the production of such material, along with flaw removal criteria. This paper describes coiled tubing and pipe up to 3.5 inches diameter for both downhole and line pipe use.

  17. Coiled-tubing applications for blowout-control operations

    SciTech Connect (OSTI)

    Adams, N.J.; Mack, S.K.; Fannin, V.R.; Rocchi, T.

    1996-05-01

    Coiled-tubing drilling is now being used in various operations. Its complete field of applications is not currently established. Coiled tubing used for well control while drilling is a new field where its limits are being explored. This paper provides guidelines on topics to be considered in determining the applicability of coiled tubing for well-control problems. The information provided is based on recent field experiences with several well-control problems when drilling vent and relief wells. In some cases, coiled-tubing drilling capabilities, by necessity, were significantly extended beyond levels the industry considered to be upper limits. Well control cannot always be handled by coiled tubing. It is a special-application tool that can handle many situations and is, in some cases, clearly the optimum choice for the application. This paper presents guidelines for selecting coiled tubing for each application and discusses economics. It also describes coiled-tubing operations for regaining control of blowout wells in certain situations and gives technical requirements for planning and executing these types of jobs. Case histories where coiled-tubing units (CTU`s) have been used to regain control of drilling and producing wells are provided for illustration.

  18. Produce through coiled tubing to keep marginal wells unloaded

    SciTech Connect (OSTI)

    Not Available

    1986-12-01

    The use of coiled tubing as an alternate production tubing string has been attempted or considered by numerous operators in the past. However, its use has been tempered due to several problems known to be inherent with coiled tubing recompletions. Some of the problems encountered are: Killing the well to allow for tubing installation always carries the risk of formation damage; Candidate wells normally are marginal producers and may not produce sufficient revenue to justify the cost of a major workover; Procedures followed to install surface equipment may be hazardous; Previous installation designs required running the coiled tubing to the top of the tree, affecting the functional loss of all existing wellhead equipment; Often substandard modifications were required to reconnect into existing production facilities. However, a prototype spool and tubing hanger that incorporated modifications designed to solve these problems has been developed jointly by Reeled Tubing, Inc., and Well-head Control Systems. The solution is a new concept in the coiled tubing hanger. The design incorporates a floating element, which is a combination slip bowl, seal element and retaining sub. The entire assembly is installed and activated in the bore of a specially designed spool installed between the primary and secondary master valves of the existing wellhead.

  19. Downhole control -- The key to coiled tubing drilling efficiency

    SciTech Connect (OSTI)

    1996-10-01

    Coiled tubing drilling has experienced dramatic growth in recent years. Originally a step-child, the technique now claims built-for-purpose equipment and promises cost-effective drilling with little damage to formations. The paper describes a bottom hole assembly and an orienting tool designed to be used to control coiled tubing drilling.

  20. Heat exchanger with leak detecting double wall tubes

    DOE Patents [OSTI]

    Bieberbach, George; Bongaards, Donald J.; Lohmeier, Alfred; Duke, James M.

    1981-01-01

    A straight shell and tube heat exchanger utilizing double wall tubes and three tubesheets to ensure separation of the primary and secondary fluid and reliable leak detection of a leak in either the primary or the secondary fluids to further ensure that there is no mixing of the two fluids.

  1. Erosion of heat exchanger tubes in fluidized beds

    SciTech Connect (OSTI)

    Johnson, E.K.; Flemmer, R.L.C.

    1991-01-01

    This final report describes the activities of the 3-year project entitled Erosion of Heat Exchanger Tubes In Fluidized Beds.'' which was completed at the end of 1990. Project accomplishments include the collection of a substantial body of wear data In a 24in. [times] 24in. fluidized bed, comparative wear results In a 6in. [times] 6in. fluidized bed, the development of a dragometer and the collection of a comprehensive set of drag force data in the 24in. [times] 24in. bed, Fast Fourier Transform (FFT) analysis of bubble probe data to establish dominant bubble frequencies in the 24in. [times] 24in. bed, the use of a heat flux gauge for measurement of heat transfer coefficients in the 24in. [times] 24in. bed and the modeling of the tube wear in the 24in. [times] 24in. bed. Analysis of the wear data from the 24in. square bed indicates that tube wear increases with increase in superficial velocity, and with increase in tube height. The latter effect is a result of the tubes higher up in the bed seeing greater movement of dense phase than tubes lower down In the bed. In addition, tube wear was found to decrease with increase in particle size, for constant superficial velocity. Three models of tube wear were formulated and provided acceptable prediction of wear when compared with the experimental data.

  2. Drift tube suspension for high intensity linear accelerators

    DOE Patents [OSTI]

    Liska, D.J.; Schamaun, R.G.; Clark, D.C.; Potter, R.C.; Frank, J.A.

    1980-03-11

    The disclosure relates to a drift tube suspension for high intensity linear accelerators. The system comprises a series of box-sections girders independently adjustably mounted on a linear accelerator. A plurality of drift tube holding stems are individually adjustably mounted on each girder.

  3. Cavity resonance absorption in ultra-high bandwidth CRT deflection structure by a resistive load

    DOE Patents [OSTI]

    Dunham, Mark E.; Hudson, Charles L.

    1993-01-01

    An improved ultra-high bandwidth helical coil deflection structure for a hode ray tube is described comprising a first metal member having a bore therein, the metal walls of which form a first ground plane; a second metal member coaxially mounted in the bore of the first metal member and forming a second ground plane; a helical deflection coil coaxially mounted within the bore between the two ground planes; and a resistive load disposed in one end of the bore and electrically connected to the first and second ground planes, the resistive load having an impedance substantially equal to the characteristic impedance of the coaxial line formed by the two coaxial ground planes to inhibit cavity resonance in the structure within the ultra-high bandwidth of operation. Preferably, the resistive load comprises a carbon film on a surface of an end plug in one end of the bore.

  4. Cavity resonance absorption in ultra-high bandwidth CRT deflection structure by a resistive load

    DOE Patents [OSTI]

    Dunham, M.E.; Hudson, C.L.

    1993-05-11

    An improved ultra-high bandwidth helical coil deflection structure for a cathode ray tube is described comprising a first metal member having a bore therein, the metal walls of which form a first ground plane; a second metal member coaxially mounted in the bore of the first metal member and forming a second ground plane; a helical deflection coil coaxially mounted within the bore between the two ground planes; and a resistive load disposed in one end of the bore and electrically connected to the first and second ground planes, the resistive load having an impedance substantially equal to the characteristic impedance of the coaxial line formed by the two coaxial ground planes to inhibit cavity resonance in the structure within the ultra-high bandwidth of operation. Preferably, the resistive load comprises a carbon film on a surface of an end plug in one end of the bore.

  5. Potential failure of steam generator tubes following a station blackout

    SciTech Connect (OSTI)

    Ward, L.W.; Palmrose, D.E.

    1994-12-31

    The U.S. Nuclear Regulatory Commission is considering changes to pressurized water reactor (PWR) requirements relating to steam generator tube plugging and repair criteria, including leakage monitoring. The proposed changes are known as the alternate tube plugging criteria (APC) and are intended to permit PWRs to operate with through-wall cracks in steam generator tubes subject to meeting a specified limit on predicted primary to secondary leakage under accident conditions. To assess the consequences of the alternate plugging criteria, analyses were performed for a station blackout sequence in which the reactor core melts while the reactor coolant system (RCS) remains at high pressure. Evaluations were conducted to investigate the potential for tube failure with and without secondary system depressurization. The excessive heat coupled with the high-pressure differentials across the steam generator tubes could result in creep rupture failure of the tubes during a severe accident, which could lead to a radiological release directly to the environment. In order to assess the safety significance of the APC, it is important to identify the level of steam generator tube leakage that can occur without challenging the previous study conclusions that steam generator creep failure will not occur prior to a surge line or hot-leg failure. To assess the effect of leakage on steam generator tube integrity during a core melt sequence with the RCS at high pressure and the secondary side of the steam generators pressurized and depressurized, an analysis was performed for a core melt event resulting from an unmitigated station blackout to identify the total steamenerator and tube leakage flow rates that could induce tube ruptures prior to other RCS boudary faliures that could depressurize the RCS.

  6. Metal wastage analysis of carbon steel tubes in FBC environment

    SciTech Connect (OSTI)

    Sethi, V.K.; Puentes, E.; Natesan, K.; Argonne National Lab., IL )

    1988-11-01

    The TVA 20-MW AFBC Pilot Plant located near Paducah, Kentucky began operations in March 1982, and it operated with the same in-bed evaporator tubes (tube bundle B1) for {approximately}13,625 h through the end of 1985. During January--February 1986, the evaporator tubes were removed to test a new tube bundle configuration (tube bundle C1). After only a short period of operation, tube diameter measurements showed that tube wastage rates for bundle C1 were almost an order of magnitude larger than those recorded for B1. Although several other changes could have been responsible for this increase, the consensus at the TVA was that the increase probably occurred because the pilot plant switched coals from a low chlorine (0.02%) to a high chlorine ({approximately}0.30%) KY 9 coal. In order to determine the validity of the role of chlorine in increasing the tube wastage, several tube sections were cut out from the plant and analyzed at the Kentucky Energy Cabinet Laboratory (KECL) and at Argonne National Laboratory (ANL). The results of the chemical and metallographic examination showed that wastage could be attributed to erosive wear of chlorine-impregnated iron oxide scales. Corrosion component (oxidation) could have been altered by the presence of elements such as chlorine, sulfur, and potassium in the combustion gases. The results also showed that, in order to understand the complex deposition/corrosion phenomena that occur in FBC systems, it is imperative to characterize the local environment in the vicinity of the tube bundles. 5 refs., 16 figs.

  7. Method and apparatus for optimized sampling of volatilizable target substances

    DOE Patents [OSTI]

    Lindgren, Eric R.; Phelan, James M.

    2004-10-12

    An apparatus for capturing, from gases such as soil gas, target analytes. Target analytes may include emanations from explosive materials or from residues of explosive materials. The apparatus employs principles of sorption common to solid phase microextraction, and is best used in conjunction with analysis means such as a gas chromatograph. To sorb target analytes, the apparatus functions using various sorptive structures to capture target analyte. Depending upon the embodiment, those structures may include a capillary tube including an interior surface on which sorptive material (similar to that on the surface of a SPME fiber) is supported (along with means for moving gases through the capillary tube so that the gases come into close proximity to the sorptive material). In one disclosed embodiment, at least one such sorptive structure is associated with an enclosure including an opening in communication with the surface of a soil region potentially contaminated with buried explosive material such as unexploded ordnance. Emanations from explosive materials can pass into and accumulate in the enclosure where they are sorbed by the sorptive structures. Also disclosed is the use of heating means such as microwave horns to drive target analytes into the soil gas from solid and liquid phase components of the soil.

  8. Bar coded retroreflective target

    DOE Patents [OSTI]

    Vann, Charles S.

    2000-01-01

    This small, inexpensive, non-contact laser sensor can detect the location of a retroreflective target in a relatively large volume and up to six degrees of position. The tracker's laser beam is formed into a plane of light which is swept across the space of interest. When the beam illuminates the retroreflector, some of the light returns to the tracker. The intensity, angle, and time of the return beam is measured to calculate the three dimensional location of the target. With three retroreflectors on the target, the locations of three points on the target are measured, enabling the calculation of all six degrees of target position. Until now, devices for three-dimensional tracking of objects in a large volume have been heavy, large, and very expensive. Because of the simplicity and unique characteristics of this tracker, it is capable of three-dimensional tracking of one to several objects in a large volume, yet it is compact, light-weight, and relatively inexpensive. Alternatively, a tracker produces a diverging laser beam which is directed towards a fixed position, and senses when a retroreflective target enters the fixed field of view. An optically bar coded target can be read by the tracker to provide information about the target. The target can be formed of a ball lens with a bar code on one end. As the target moves through the field, the ball lens causes the laser beam to scan across the bar code.

  9. Microhole Coiled Tubing Bottom Hole Assemblies

    SciTech Connect (OSTI)

    Don Macune

    2008-06-30

    The original objective of the project, to deliver an integrated 3 1/8-inch diameter Measurement While Drilling (MWD) and Logging While Drilling (LWD) system for drilling small boreholes using coiled tubing drilling, has been achieved. Two prototype systems have been assembled and tested in the lab. One of the systems has been successfully tested downhole in a conventional rotary drilling environment. Development of the 3 1/8-inch system has also lead to development and commercialization of a slightly larger 3.5-inch diameter system. We are presently filling customer orders for the 3.5-inch system while continuing with commercialization of the 3 1/8-inch system. The equipment developed by this project will be offered for sale to multiple service providers around the world, enabling the more rapid expansion of both coiled tubing drilling and conventional small diameter drilling. The project was based on the reuse of existing technology whenever possible in order to minimize development costs, time, and risks. The project was begun initially by Ultima Labs, at the time a small company ({approx}12 employees) which had successfully developed a number of products for larger oil well service companies. In September, 2006, approximately 20 months after inception of the project, Ultima Labs was acquired by Sondex plc, a worldwide manufacturer of downhole instrumentation for cased hole and drilling applications. The acquisition provided access to proven technology for mud pulse telemetry, downhole directional and natural gamma ray measurements, and surface data acquisition and processing, as well as a global sales and support network. The acquisition accelerated commercialization through existing Sondex customers. Customer demand resulted in changes to the product specification to support hotter (150 C) and deeper drilling (20,000 psi pressure) than originally proposed. The Sondex acquisition resulted in some project delays as the resistivity collar was interfaced to a different MWD system and also as the mechanical design was revised for the new pressure requirements. However, the Sondex acquisition has resulted in a more robust system, secure funding for completion of the project, and more rapid commercialization.

  10. Spinning Reserve From Responsive Loads

    SciTech Connect (OSTI)

    Kirby, B.J.

    2003-04-08

    Responsive load is the most underutilized reliability resource available to the power system today. It is currently not used at all to provide spinning reserve. Historically there were good reasons for this, but recent technological advances in communications and controls have provided new capabilities and eliminated many of the old obstacles. North American Electric Reliability Council (NERC), Federal Energy Regulatory Commission (FERC), Northeast Power Coordinating Council (NPCC), New York State Reliability Council (NYSRC), and New York Independent System Operator (NYISO) rules are beginning to recognize these changes and are starting to encourage responsive load provision of reliability services. The Carrier ComfortChoice responsive thermostats provide an example of these technological advances. This is a technology aimed at reducing summer peak demand through central control of residential and small commercial air-conditioning loads. It is being utilized by Long Island Power Authority (LIPA), Consolidated Edison (ConEd), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E). The technology is capable of delivering even greater response in the faster spinning reserve time frame (while still providing peak reduction). Analysis of demand reduction testing results from LIPA during the summer of 2002 provides evidence to back up this claim. It also demonstrates that loads are different from generators and that the conventional wisdom, which advocates for starting with large loads as better ancillary service providers, is flawed. The tempting approach of incrementally adapting ancillary service requirements, which were established when generators were the only available resources, will not work. While it is easier for most generators to provide replacement power and non-spinning reserve (the slower response services) than it is to supply spinning reserve (the fastest service), the opposite is true for many loads. Also, there is more financial reward for supplying spinning reserve than for supplying the other reserve services as a result of the higher spinning reserve prices. The LIPAedge program (LIPA's demand reduction program using Carrier ComfortChoice thermostats) provides an opportunity to test the use of responsive load for spinning reserve. With potentially 75 MW of spinning reserve capability already installed, this test program can also make an important contribution to the capacity needs of Long Island during the summer of 2003. Testing could also be done at ConEd ({approx}30 MW), SCE ({approx}15 MW), and/or SDG&E ({approx}15 MW). This paper is divided into six chapters. Chapter 2 discusses the contingency reserve ancillary services, their functions in supporting power system reliability, and their technical requirements. It also discusses the policy and tariff requirements and attempts to distinguish between ones that are genuinely necessary and ones that are artifacts of the technologies that were historically used to provide the services. Chapter 3 discusses how responsive load could provide contingency reserves (especially spinning reserve) for the power system. Chapter 4 specifically discusses the Carrier ComfortChoice responsive thermostat technology, the LIPAedge experience with that technology, and how the technology could be used to supply spinning reserve. Chapter 5 discusses a number of unresolved issues and suggests areas for further research. Chapter 6 offers conclusions and recommendations.

  11. SINGLE CRYSTAL NIOBIUM TUBES FOR PARTICLE COLLIDERS ACCELERATOR CAVITIES

    SciTech Connect (OSTI)

    MURPHY, JAMES E

    2013-02-28

    The objective of this research project is to produce single crystal niobium (Nb) tubes for use as particle accelerator cavities for the Fermi laboratorys International Linear Collider project. Single crystal Nb tubes may have superior performance compared to a polycrystalline tubes because the absence of grain boundaries may permit the use of higher accelerating voltages. In addition, Nb tubes that are subjected to the high temperature, high vacuum crystallization process are very pure and well annealed. Any impurity with a significantly higher vapor pressure than Nb should be decreased by the relatively long exposure at high temperature to the high vacuum environment. After application of the single crystal process, the surfaces of the Nb tubes are bright and shiny, and the tube resembles an electro polished Nb tube. For these reasons, there is interest in single crystal Nb tubes and in a process that will produce single crystal tubes. To convert a polycrystalline niobium tube into a single crystal, the tube is heated to within a few hundred ?C of the melting temperature of niobium, which is 2477 ?C. RF heating is used to rapidly heat the tube in a narrow zone and after reaching the operating temperature, the hot zone is slowly passed along the length of the tube. For crystallization tests with Nb tubes, the traverse rate was in the range of 1-10 cm per hour. All the crystallization tests in this study were performed in a water-cooled, stainless steel chamber under a vacuum of 5 x10-6 torr or better. In earliest tests of the single crystal growth process, the Nb tubes had an OD of 1.9 cm and a wall thickness of 0.15 mm. With these relatively small Nb tubes, the single crystal process was always successful in producing single crystal tubes. In these early tests, the operating temperature was normally maintained at 2200 ?C, and the traverse rate was 5 cm per hour. In the next test series, the Nb tube size was increased to 3.8 cm OD and the wall thickness was increased 0.18 mm and eventually to 0.21 mm. Again, with these larger tubes, single crystal tubes were usually produced by the crystallization process. The power supply was generally operated at full output during these tests, and the traverse rate was 5 cm per hour. In a few tests, the traverse rate was increased to 10 cm per hour, and at the faster traverse rate, single crystal growth was not achieved. In these tests with a faster traverse rate, it was thought that the tube was not heated to a high enough temperature to achieve single crystal growth. In the next series of tests, the tube OD was unchanged at 3.8 cm and the wall thickness was increased to 0.30 mm. The increased wall thickness made it difficult to reach an operating temperature above 2,000 ?C, and although the single crystal process caused a large increase in the crystal grains, no single crystal tubes were produced. It was assumed that the operating temperature in these tests was not high enough to achieve single crystal growth. In FY 2012, a larger power supply was purchased and installed. With the new power supply, temperatures above the melting point of Nb were easily obtained regardless of the tube thickness. A series of crystallization tests was initiated to determine if indeed the operating temperature of the previous tests was too low to achieve single crystal growth. For these tests, the Nb tube OD remained at 3.8 cm and the wall thickness was 0.30 mm. The first test had an operating temperature of 2,000 ?C. and the operating temperature was increased by 50 ?C increments for each successive test. The final test was very near the Nb melting temperature, and indeed, the Nb tube eventually melted in the center of the tube. These tests showed that higher temperatures did yield larger grain sizes if the traverse rate was held constant at 5 cm per hour, but no single crystal tubes were produced even at the highest operating temperature. In addition, slowing the traverse rate to as low as 1 cm per hour did not yield a single crystal tube regardless of operating temperature. At this time, it

  12. Sandia Wind Turbine Loads Database

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wind Turbine Loads Database - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  13. PASSIVE DETECTION OF VEHICLE LOADING

    SciTech Connect (OSTI)

    Garrett, A.

    2012-01-03

    The Digital Imaging and Remote Sensing Laboratory (DIRS) at the Rochester Institute of Technology, along with the Savannah River National Laboratory is investigating passive methods to quantify vehicle loading. The research described in this paper investigates multiple vehicle indicators including brake temperature, tire temperature, engine temperature, acceleration and deceleration rates, engine acoustics, suspension response, tire deformation and vibrational response. Our investigation into these variables includes building and implementing a sensing system for data collection as well as multiple full-scale vehicle tests. The sensing system includes; infrared video cameras, triaxial accelerometers, microphones, video cameras and thermocouples. The full scale testing includes both a medium size dump truck and a tractor-trailer truck on closed courses with loads spanning the full range of the vehicle's capacity. Statistical analysis of the collected data is used to determine the effectiveness of each of the indicators for characterizing the weight of a vehicle. The final sensing system will monitor multiple load indicators and combine the results to achieve a more accurate measurement than any of the indicators could provide alone.

  14. Advances in coiled-tubing operating systems

    SciTech Connect (OSTI)

    Sas-Jaworsky, A. II

    1997-06-01

    The expansion of coiled tubing (CT) applications into spooled flowlines, spooled completions, and CT drilling continues to grow at an accelerated rate. For many users within the oil and gas industry, the CT industry appears to be poised on the threshold of the next logical step in its evolution, the creation of a fully integrated operating system. However, for CT to evolve into such an operating system, the associated services must be robust and sufficiently reliable to support the needs of exploration, development drilling, completion, production management, and wellbore-retirement operations both technically and economically. The most critical hurdle to overcome in creating a CT-based operating system is a fundamental understanding of the operating scope and physical limitations of CT technology. The complete list of mechanisms required to advance CT into an operating system is large and complex. However, a few key issues (such as formal education, training, standardization, and increased levels of experience) can accelerate the transition. These factors are discussed.

  15. HYDROGEN ISOTOPE TARGETS

    DOE Patents [OSTI]

    Ashley, R.W.

    1958-08-12

    The design of targets for use in the investigation of nuclear reactions of hydrogen isotopes by bombardment with accelerated particles is described. The target con struction eomprises a backing disc of a metal selected from the group consisting of molybdenunn and tungsten, a eoating of condensed titaniunn on the dise, and a hydrogen isotope selected from the group consisting of deuterium and tritium absorbed in the coatiag. The proeess for preparing these hydrogen isotope targets is described.

  16. Multiaxial cyclic ratcheting in coiled tubing -- Part 1: Theoretical modeling

    SciTech Connect (OSTI)

    Rolovic, R.; Tipton, S.M.

    2000-04-01

    Coiled tubing is a long, continuous string of steel tubing that is used in the oil well drilling and servicing industry. Bending strains imposed on coiled tubing as it is deployed and retrieved from a well are considerably into the plastic regime and can be as high as 3%. Progressive growth of tubing diameter occurs when tubing is cyclically bent-straightened under constant internal pressure, regardless of the fact that the hoop stress imposed by typical pressure levels is well below the material's yield strength. A new incremental plasticity model is proposed in this study that can predict multiaxial cyclic ratcheting in coiled tubing more accurately than the conventional plasticity models. A new hardening rule is presented based on published experimental observations. The model also implements a new plastic modulus function. The predictions based on the new theory correlate well with experimental results presented in Part 2 of this paper. Some previously unexpected trends in coiled tubing deformation behavior were observed and correctly predicted using the proposed model.

  17. Tube Bank C - metal wastage: status report, August 1983

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    The Experimental Pressurised Fluidized Bed Combustion Facility at Grimethorpe, South Yorkshire, UK incorporates an in-bed tube bank. During the operation of the facility between June and September 1982, an unexpectedly high degree of metal wastage occurred from the external surfaces of this tube bank. Measures were taken to reduce the rate of metal wastage and extend the life of the tube bank, which was subsequently replaced in July 1983 after a total operating period of 1222 hours of coal burning. Using small-scale fluidized bed cold models, experimental investigations were carried out to determine measures to reduce the metal wastage. The results indicated that metal wastage would be reduced by the following changes: a reduction in the fluidizing velocity; the attachment of studs or axial fins to the tubes; a reduction in the height of the space between the distributor plate and the bottom of the tube bank; and the elimination, where possible of any large gaps within the tube bank. Such changes have been incorporated into the design of the replacement tube bank. This has now been installed and has experienced significantly less metal wastage. 9 references, 6 tables, 34 figures.

  18. Explosively driven air blast in a conical shock tube

    SciTech Connect (OSTI)

    Stewart, Joel B. Pecora, Collin

    2015-03-15

    Explosively driven shock tubes present challenges in terms of safety concerns and expensive upkeep of test facilities but provide more realistic approximations to the air blast resulting from free-field detonations than those provided by gas-driven shock tubes. Likewise, the geometry of conical shock tubes can naturally approximate a sector cut from a spherically symmetric blast, leading to a better agreement with the blast profiles of free-field detonations when compared to those provided by shock tubes employing constant cross sections. The work presented in this article documents the design, fabrication, and testing of an explosively driven conical shock tube whose goal was to closely replicate the blast profile seen from a larger, free-field detonation. By constraining the blast through a finite area, large blasts (which can add significant damage and safety constraints) can be simulated using smaller explosive charges. The experimental data presented herein show that a close approximation to the free-field air blast profile due to a 1.5 lb charge of C4 at 76 in. can be achieved by using a 0.032 lb charge in a 76-in.-long conical shock tube (which translates to an amplification factor of nearly 50). Modeling and simulation tools were used extensively in designing this shock tube to minimize expensive fabrication costs.

  19. Flight Path Target 2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Target 2 provides experimenters direct access to the 800 MeV proton beam as well as several flight paths. Target 2 is located in MPF-7 at LANSCE.. About Target 2 - Lead Slowing Down Spectrometer lsds1 LSDS with cadmium sheets on the outside to reduce room-return neutrons. The Blue Room is the shield structure and experiment housing building around Target 2. The Lead Slowing Down Spectrometer (LSDS) installed in the Blue Room at the Los Alamos Science Center is a 20-ton cube of lead surrounding

  20. Flight Path Target 2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Target 2 provides experimenters direct access to the 800 MeV proton beam as well as several flight paths. Target 2 is located in MPF-7 at LANSCE.. Target 2 Target 2 is housed in the Blue Room in MPF-7 at LANSCE and provides experimenters direct access to the LANSCE proton beam. The Blue Room is a domed room with a diameter of 40 feet. The main floor of the Blue Room is constructed primarily of aluminum and elevated 20 feet above the basement floor to minimize neutron wall return for experiments

  1. Overview of steam generator tube degradation and integrity issues

    SciTech Connect (OSTI)

    Diercks, D.R.; Shack, W.J.; Muscara, J.

    1996-10-01

    The degradation of steam generator tubes in pressurized water nuclear reactors continues to be a serious problem. Primary water stress corrosion cracking is commonly observed at the roll transition zone at U-bends, at tube denting locations, and occasionally in plugs and sleeves. Outer-diameter stress corrosion cracking and intergranular attack commonly occur near the tube support plate crevice, near the tube sheet in crevices or under sludge piles, and occasionally in the free span. A particularly troubling recent trend has been the increasing occurrence of circumferential cracking at the RTZ on both the primary and secondary sides. Segmented axial cracking at the tubes support plate crevices is also becoming more common. Despite recent advances in in-service inspection technology, a clear need still exists for quantifying and improving the reliability of in- service inspection methods with respect to the probability of detection of the various types of flaws and their accurate sizing. Improved inspection technology and the increasing occurrence of such degradation modes as circumferential cracking, intergranular attack, and discontinuous axial cracking have led to the formulation of a new performance-based steam generator rule. This new rule would require the development and implementation of a steam generator management program that monitors tube condition against accepted performance criteria to ensure that the tubes perform the required safety function over the next operating cycle. The new steam generator rule will also be applied to severe accident conditions to determine the continued serviceability of a steam generator with degraded tubes in the event of a severe accident. Preliminary analyses are being performed for a hypothetical severe accident scenario to determine whether failure will occur first in the steam generator tubes, which would lead to containment bypass, or instead in the hot leg nozzle or surge line, which would not.

  2. FABRICATION OF TUBE TYPE FUEL ELEMENT FOR NUCLEAR REACTORS

    DOE Patents [OSTI]

    Loeb, E.; Nicklas, J.H.

    1959-02-01

    A method of fabricating a nuclear reactor fuel element is given. It consists essentially of fixing two tubes in concentric relationship with respect to one another to provide an annulus therebetween, filling the annulus with a fissionablematerial-containing powder, compacting the powder material within the annulus and closing the ends thereof. The powder material is further compacted by swaging the inner surface of the inner tube to increase its diameter while maintaining the original size of the outer tube. This process results in reduced fabrication costs of powdered fissionable material type fuel elements and a substantial reduction in the peak core temperatures while materially enhancing the heat removal characteristics.

  3. Fluidized bed heat exchanger utilizing angularly extending heat exchange tubes

    DOE Patents [OSTI]

    Talmud, Fred M.; Garcia-Mallol, Juan-Antonio

    1980-01-01

    A fluidized bed heat exchanger in which air is passed through a bed of particulate material containing fuel disposed in a housing. A steam/water natural circulation system is provided and includes a steam drum disposed adjacent the fluidized bed and a series of tubes connected at one end to the steam drum. A portion of the tubes are connected to a water drum and in the path of the air and the gaseous products of combustion exiting from the bed. Another portion of the tubes pass through the bed and extend at an angle to the upper surface of the bed.

  4. Hole cleaning imperative in coiled tubing drilling operations

    SciTech Connect (OSTI)

    Rameswar, R.M.; Mudda, K.

    1995-09-01

    Annular flow modeling in coiled tubing applications is essential for optimizing mud rheology and keeping the hole clean. Cuttings transport in coiled tubing drilling must be optimized, particularly the modeling of hole cleaning capabilities. The effects of two different muds in contrasting geometries on hold cleaning efficiency are considered, with the simulation performed using Petrocalc 14. Coiled tubing is widely used to drill new vertical and horizontal wells, and in re-entry operations. Horizontal well problems are subsequently modeled, where annular eccentricities can range anywhere from concentric to highly offset, given the highly buckled or helically deflected states of many drill coils.

  5. Serviceability of coiled tubing for sour oil and gas wells

    SciTech Connect (OSTI)

    Cayard, M.S.; Kane, R.D.

    1996-08-01

    Coiled tubing is an extremely useful tool in many well logging and workover applications in oil and gas production operations. Several important concerns regarding its use include the need for improved guidelines for the assessment of mechanical integrity, fatigue damage, and the effects of hydrogen sulfide in sour oil and gas production environments. This paper provides information regarding the use of coiled tubing in sour environments with particular emphasis on sulfide stress cracking, hydrogen induced cracking and stress-oriented hydrogen induced cracking and how they work synergistically with cyclic cold working of the steel tubing.

  6. In-bed tube bank for a fluidized-bed combustor

    DOE Patents [OSTI]

    Hemenway, Jr., Lloyd F.

    1990-01-01

    An in-bed tube bank (10) for a fluidized bed combustor. The tube bank (10) of the present invention comprises one or more fluid communicating boiler tubes (30) which define a plurality of selectively spaced boiler tube sections (32). The tube sections (32) are substantially parallel to one another and aligned in a common plane. The tube bank (10) further comprises support members (34) for joining adjacent tube sections (32), the support members (34) engaging and extending along a selected length of the tube sections (32) and spanning the preselected space therebetween.

  7. Tubing wastage in fluidized-bed coal combustors (Grimethorpe PFBC (pressurized fluidized-bed combustion) Tube Bank E'')

    SciTech Connect (OSTI)

    Witherell, C.E.

    1989-10-04

    Samples of evaporator tubing from Tube Bank E'' of the Grimethorpe pressurized fluidized-bed combustion (PFBC) facility in the UK were examined in the third of a series of studies being conducted at Lawrence Livermore National Laboratory (LLNL) under sponsorship of the US Department of Energy's Morgantown Energy Technology Center (METC). The program is being conducted to identify the mechanism or mechanisms responsible for metal loss (wastage) of in-bed carbon-steel evaporator tubes in bubbling-bed coal combustors. Results of examination suggest that bed conditions were less aggressive than in previous experiments in this combustor; however, tubing wastage was observed in some samples. Observations made on these tubes are consistent with the hypothesis of tubing wastage proposed in reports of previous LLNL studies conducted under this program that the dominant cause of metal loss is exfoliation of the normally-protective oxide scale by impacting bed particulates. Good correlation was also observed with trends noted earlier that microstructure of the tubing steel plays a role in its wastage response. 12 refs., 29 figs., 3 tabs.

  8. Coiled tubing drilling with supercritical carbon dioxide

    DOE Patents [OSTI]

    Kolle , Jack J.

    2002-01-01

    A method for increasing the efficiency of drilling operations by using a drilling fluid material that exists as supercritical fluid or a dense gas at temperature and pressure conditions existing at a drill site. The material can be used to reduce mechanical drilling forces, to remove cuttings, or to jet erode a substrate. In one embodiment, carbon dioxide (CO.sub.2) is used as the material for drilling within wells in the earth, where the normal temperature and pressure conditions cause CO.sub.2 to exist as a supercritical fluid. Supercritical carbon dioxide (SC--CO.sub.2) is preferably used with coiled tube (CT) drilling equipment. The very low viscosity SC--CO.sub.2 provides efficient cooling of the drill head, and efficient cuttings removal. Further, the diffusivity of SC--CO.sub.2 within the pores of petroleum formations is significantly higher than that of water, making jet erosion using SC--CO.sub.2 much more effective than water jet erosion. SC--CO.sub.2 jets can be used to assist mechanical drilling, for erosion drilling, or for scale removal. A choke manifold at the well head or mud cap drilling equipment can be used to control the pressure within the borehole, to ensure that the temperature and pressure conditions necessary for CO.sub.2 to exist as either a supercritical fluid or a dense gas occur at the drill site. Spent CO.sub.2 can be vented to the atmosphere, collected for reuse, or directed into the formation to aid in the recovery of petroleum.

  9. Further advances in coiled-tubing drilling

    SciTech Connect (OSTI)

    Eide, E.; Brinkhorst, J.; Voelker, H.; Burge, P.; Ewen, R.

    1995-05-01

    The use of coiled tubing (CT) to drill horizontal re-entry wells has received considerable interest in the industry over the last two years. The benefits of being able to drill at balance, safely and in a controlled manner, with nitrogen to reduce downhole pressure while drilling highly depleted reservoirs, provides an advantage over conventional techniques, particularly in reducing formation damage. This paper describes such a horizontal re-entry drilled in the shallow depleted waterflooded reservoir Barenburg in northern Germany. The scope of work for this project included (1) cutting windows through 6 5/8- and 9 5/8-in. casing, (2) drilling a 5 7/8-in.-medium-radius curve, (3) running a 5-in. liner and a 5 1/2-in. parasitic string for nitrogen injection, (4) drilling a 4 3/8-in. horizontal with nitrogen to maintain a balanced condition, (5) running openhole logs, and (6) running 3 1/2-in. slotted liner. The entire program was executed with no intervention from a conventional rig or workover hoist. A special structure to be positioned over the well to support the CT injector head and to provide a work platform had to be constructed for this type of operation. A dedicated mast for lifting pipe and downhole tools was placed on the substructure. The development of a surface-controlled orienting tool and an adjustable motor provided excellent directional capabilities on a 2 3/8-in. CT. This program represents a significant extension of the capabilities of drilling with CT.

  10. Production Target Design Report

    SciTech Connect (OSTI)

    Woloshun, Keith Albert; Dale, Gregory E.; Olivas, Eric Richard

    2015-07-28

    The Northstar 99Mo production target, a cylindrical length of 100Mo rod, has evolved considerably since its first conception.The cylinder was very early sliced into disks to increase the heat transfer area, first to 1 mm thick disks then to the current 0.5 mm thick.The coolant was changed early in the target development from water to helium to eliminate corrosion and dissolution.The diameter has increased from initially 6 mm to 12 mm, the current diameter of the test target now at ANL, to nominally 28 mm (26-30.6 mm, depending upon optimal beam spot size and shape).The length has also changed to improve the production to cost ratio, so now the target is nominally 41 mm long (excluding coolant gaps between disks), and irradiated on both ends.This report summarizes the current status of the plant target design.

  11. Plug Load Behavioral Change Demonstration Project

    SciTech Connect (OSTI)

    Metzger, I.; Kandt, A.; VanGeet, O.

    2011-08-01

    This report documents the methods and results of a plug load study of the Environmental Protection Agency's Region 8 Headquarters in Denver, Colorado, conducted by the National Renewable Energy Laboratory. The study quantified the effect of mechanical and behavioral change approaches on plug load energy reduction and identified effective ways to reduce plug load energy. Load reduction approaches included automated energy management systems and behavioral change strategies.

  12. Automated fuel pin loading system

    DOE Patents [OSTI]

    Christiansen, David W. (Kennewick, WA); Brown, William F. (West Richland, WA); Steffen, Jim M. (Richland, WA)

    1985-01-01

    An automated loading system for nuclear reactor fuel elements utilizes a gravity feed conveyor which permits individual fuel pins to roll along a constrained path perpendicular to their respective lengths. The individual lengths of fuel cladding are directed onto movable transports, where they are aligned coaxially with the axes of associated handling equipment at appropriate production stations. Each fuel pin can be reciprocated axially and/or rotated about its axis as required during handling steps. The fuel pins are inserted as a batch prior to welding of end caps by one of two disclosed welding systems.

  13. Automated fuel pin loading system

    DOE Patents [OSTI]

    Christiansen, D.W.; Brown, W.F.; Steffen, J.M.

    An automated loading system for nuclear reactor fuel elements utilizes a gravity feed conveyor which permits individual fuel pins to roll along a constrained path perpendicular to their respective lengths. The individual lengths of fuel cladding are directed onto movable transports, where they are aligned coaxially with the axes of associated handling equipment at appropriate production stations. Each fuel pin can be be reciprocated axially and/or rotated about its axis as required during handling steps. The fuel pins are inerted as a batch prior to welding of end caps by one of two disclosed welding systems.

  14. High loading uranium fuel plate

    DOE Patents [OSTI]

    Wiencek, Thomas C.; Domagala, Robert F.; Thresh, Henry R.

    1990-01-01

    Two embodiments of a high uranium fuel plate are disclosed which contain a meat comprising structured uranium compound confined between a pair of diffusion bonded ductile metal cladding plates uniformly covering the meat, the meat having a uniform high fuel loading comprising a content of uranium compound greater than about 45 Vol. % at a porosity not greater than about 10 Vol. %. In a first embodiment, the meat is a plurality of parallel wires of uranium compound. In a second embodiment, the meat is a dispersion compact containing uranium compound. The fuel plates are fabricated by a hot isostatic pressing process.

  15. Laser-launched flyer plate and confined laser ablation for shock wave loading: Validation and applications

    SciTech Connect (OSTI)

    Paisley, Dennis L.; Luo Shengnian; Greenfield, Scott R.; Koskelo, Aaron C.

    2008-02-15

    We present validation and some applications of two laser-driven shock wave loading techniques: laser-launched flyer plate and confined laser ablation. We characterize the flyer plate during flight and the dynamically loaded target with temporally and spatially resolved diagnostics. With transient imaging displacement interferometry, we demonstrate that the planarity (bow and tilt) of the loading induced by a spatially shaped laser pulse is within 2-7 mrad (with an average of 4{+-}1 mrad), similar to that in conventional techniques including gas gun loading. Plasma heating of target is negligible, in particular, when a plasma shield is adopted. For flyer plate loading, supported shock waves can be achieved. Temporal shaping of the drive pulse in confined laser ablation allows for flexible loading, e.g., quasi-isentropic, Taylor-wave, and off-Hugoniot loading. These techniques can be utilized to investigate such dynamic responses of materials as Hugoniot elastic limit, plasticity, spall, shock roughness, equation of state, phase transition, and metallurgical characteristics of shock-recovered samples.

  16. Eddy sensors for small diameter stainless steel tubes.

    SciTech Connect (OSTI)

    Skinner, Jack L.; Morales, Alfredo Martin; Grant, J. Brian; Korellis, Henry James; LaFord, Marianne Elizabeth; Van Blarigan, Benjamin; Andersen, Lisa E.

    2011-08-01

    The goal of this project was to develop non-destructive, minimally disruptive eddy sensors to inspect small diameter stainless steel metal tubes. Modifications to Sandia's Emphasis/EIGER code allowed for the modeling of eddy current bobbin sensors near or around 1/8-inch outer diameter stainless steel tubing. Modeling results indicated that an eddy sensor based on a single axial coil could effectively detect changes in the inner diameter of a stainless steel tubing. Based on the modeling results, sensor coils capable of detecting small changes in the inner diameter of a stainless steel tube were designed, built and tested. The observed sensor response agreed with the results of the modeling and with eddy sensor theory. A separate limited distribution SAND report is being issued demonstrating the application of this sensor.

  17. Ultrasonic probe for inspecting double-wall tube

    DOE Patents [OSTI]

    Cook, Kenneth V. (Clinton, TN); Cunningham, Jr., Robert A. (Powell, TN); Murrin, Horace T. (Alcoa, TN)

    1983-01-01

    An ultrasonic probe for inspecting the interface between the walls of a double-wall tube comprises a cylindrical body member having two cavities axially spaced apart thereon. The probe is placed in the tube and ultrasonic energy is transmitted from a transducer in its body member to a reflector in one of its cavities and thence into the inner wall of the tube. A second transducer in the probe body member communicates with the second cavity through a collimation passage in the body member, and the amount of ultrasonic energy reflected from the interface between the walls of the tube to a second reflector through the collimation passage to the second transducer depends upon the characteristics of said interface.

  18. Ultrasonic probe for inspecting double-wall tube. [Patent application

    DOE Patents [OSTI]

    Cook, K.V.; Cunningham, R.A. Jr.; Murrin, H.T.

    1981-05-29

    An ultrasonic probe for inspecting the interface between the walls of a double-wall tube comprises a cylindrical body member having two cavities axially spaced apart thereon. The probe is placed in the tube and ultrasonic energy is transmitted from a transducer in its body member to a reflector in one of its cavities and thence into the inner wall of the tube. A second transducer in the probe body member communicates with the second cavity through a collimation passage in the body member, and the amount of ultrasonic energy reflected from the interface between the walls of the tube to a second reflector through the collimation passage to the second transducer depends upon the characteristics of said interface.

  19. Bundled multi-tube nozzle for a turbomachine

    DOE Patents [OSTI]

    Lacy, Benjamin Paul; Ziminsky, Willy Steve; Johnson, Thomas Edward; Zuo, Baifang; York, William David; Uhm, Jong Ho

    2015-09-22

    A turbomachine includes a compressor, a combustor operatively connected to the compressor, an end cover mounted to the combustor, and an injection nozzle assembly operatively connected to the combustor. The injection nozzle assembly includes a cap member having a first surface that extends to a second surface. The cap member further includes a plurality of openings. A plurality of bundled mini-tube assemblies are detachably mounted in the plurality of openings in the cap member. Each of the plurality of bundled mini-tube assemblies includes a main body section having a first end section and a second end section. A fluid plenum is arranged within the main body section. A plurality of tubes extend between the first and second end sections. Each of the plurality of tubes is fluidly connected to the fluid plenum.

  20. Modeling coiled-tubing velocity strings for gas wells

    SciTech Connect (OSTI)

    Martinez, J.; Martinez, A.

    1998-02-01

    Because of its ability to prolong well life, its relatively low expense, and the relative ease with which it is installed, coiled tubing has become a preferred remedial method of tubular completion for gas wells. Of course, the difficulty in procuring wireline-test data is a drawback to verifying the accuracy of the assumptions and predictions used for coiled-tubing selection. This increases the importance of the prediction-making process, and, as a result, places great emphasis on the modeling methods that are used. This paper focuses on the processes and methods for achieving sound multiphase-flow predictions by looking at the steps necessary to arrive at coiled-tubing selection. Furthermore, this paper examines the variables that serve as indicators of the viability of each tubing size, especially liquid holdup. This means that in addition to methodology, emphasis is placed on the use of a good wellbore model. The computer model discussed is in use industry wide.

  1. World Oils`s 1995 coiled tubing tables

    SciTech Connect (OSTI)

    1995-03-01

    Increasingly in demand in almost every aspect of today`s E and P market because of flexibility, versatility and economy, coiled tubing is being used for a variety of drilling, completion and production operations that previously required conventional jointed pipe, workover and snubbing units, or rotary drilling rigs. For 1995 the popular coiled tubing tables have been reformatted, expanded and improved to give industry engineering and field personnel additional, more specific selection, operational and installation information. Traditional specifications and dimensions have been augmented by addition of calculated performance properties for downhole workover and well servicing applications. For the first time the authors are presenting this information as a stand-alone feature, separate from conventional jointed tubing connection design tables, which are published annually in the January issue. With almost seven times as much usable data as previous listings, the authors hope that their new coiled tubing tables are even more practical and useful to their readers.

  2. Midcontinent well operators learn advantages of coiled-tubing techniques

    SciTech Connect (OSTI)

    Lyle, D.

    1995-07-01

    From well cleanup to velocity strings to squeeze jobs, more Midcontinent operators are adding coiled-tubing methods to their oilfield techniques. The advantages of these techniques are discussed.

  3. Specialized equipment enabled completions with large coiled tubing

    SciTech Connect (OSTI)

    Taylor, R.W.; Conrad, B.

    1996-02-19

    Specialized equipment enabled successful well completions in Oman with large 3{1/2}-inch coiled tubing. Conventional drilling or completion rigs were not needed. Although the use of 3{1/2}-inch coiled tubing to complete wells is relatively new, it is gaining widespread industry application. One Middle East operating company felt that if downhole completion equipment could be successfully run using coiled tubing, greater cost efficiency, both in initial deployment and in maintenance, could be derived. The paper lists some of the technical considerations for these assumptions. The long-term advantages regarding production and well maintenance cannot yet be determined, but experience in Oman has confirmed the belief that large coiled tubing completions can be technically achieved.

  4. OBSERVATION OF FLUX-TUBE CROSSINGS IN THE SOLAR WIND

    SciTech Connect (OSTI)

    Arnold, L.; Li, G.; Li, X.; Yan, Y.

    2013-03-20

    Current sheets are ubiquitous in the solar wind. They are a major source of the solar wind MHD turbulence intermittency. They may result from nonlinear interactions of the solar wind MHD turbulence or are the boundaries of flux tubes that originate from the solar surface. Some current sheets appear in pairs and are the boundaries of transient structures such as magnetic holes and reconnection exhausts or the edges of pulsed Alfven waves. For an individual current sheet, discerning whether it is a flux-tube boundary or due to nonlinear interactions or the boundary of a transient structure is difficult. In this work, using data from the Wind spacecraft, we identify two three-current-sheet events. Detailed examination of these two events suggests that they are best explained by the flux-tube-crossing scenario. Our study provides convincing evidence supporting the scenario that the solar wind consists of flux tubes where distinct plasmas reside.

  5. Alternative Electrostatic Green's Function for a Long Tube

    SciTech Connect (OSTI)

    Barlow, Stephan E.

    2003-11-01

    This note describes an expression for the electrostatic Green's function in a long conducting tube. The expression allows one to readily compute the potentials and fields at and in the vicinity of the singularity where other methods have difficulty.

  6. HIGH-POWER TURBODRILL AND DRILL BIT FOR DRILLING WITH COILED TUBING

    SciTech Connect (OSTI)

    Robert Radtke; David Glowka; Man Mohan Rai; David Conroy; Tim Beaton; Rocky Seale; Joseph Hanna; Smith Neyrfor; Homer Robertson

    2008-03-31

    Commercial introduction of Microhole Technology to the gas and oil drilling industry requires an effective downhole drive mechanism which operates efficiently at relatively high RPM and low bit weight for delivering efficient power to the special high RPM drill bit for ensuring both high penetration rate and long bit life. This project entails developing and testing a more efficient 2-7/8 in. diameter Turbodrill and a novel 4-1/8 in. diameter drill bit for drilling with coiled tubing. The high-power Turbodrill were developed to deliver efficient power, and the more durable drill bit employed high-temperature cutters that can more effectively drill hard and abrasive rock. This project teams Schlumberger Smith Neyrfor and Smith Bits, and NASA AMES Research Center with Technology International, Inc (TII), to deliver a downhole, hydraulically-driven power unit, matched with a custom drill bit designed to drill 4-1/8 in. boreholes with a purpose-built coiled tubing rig. The U.S. Department of Energy National Energy Technology Laboratory has funded Technology International Inc. Houston, Texas to develop a higher power Turbodrill and drill bit for use in drilling with a coiled tubing unit. This project entails developing and testing an effective downhole drive mechanism and a novel drill bit for drilling 'microholes' with coiled tubing. The new higher power Turbodrill is shorter, delivers power more efficiently, operates at relatively high revolutions per minute, and requires low weight on bit. The more durable thermally stable diamond drill bit employs high-temperature TSP (thermally stable) diamond cutters that can more effectively drill hard and abrasive rock. Expectations are that widespread adoption of microhole technology could spawn a wave of 'infill development' drilling of wells spaced between existing wells, which could tap potentially billions of barrels of bypassed oil at shallow depths in mature producing areas. At the same time, microhole coiled tube drilling offers the opportunity to dramatically cut producers' exploration risk to a level comparable to that of drilling development wells. Together, such efforts hold great promise for economically recovering a sizeable portion of the estimated remaining shallow (less than 5,000 feet subsurface) oil resource in the United States. The DOE estimates this U.S. targeted shallow resource at 218 billion barrels. Furthermore, the smaller 'footprint' of the lightweight rigs utilized for microhole drilling and the accompanying reduced drilling waste disposal volumes offer the bonus of added environmental benefits. DOE analysis shows that microhole technology has the potential to cut exploratory drilling costs by at least a third and to slash development drilling costs in half.

  7. Porous coolant tube holder for fuel cell stack

    DOE Patents [OSTI]

    Guthrie, Robin J. (East Hartford, CT)

    1981-01-01

    A coolant tube holder for a stack of fuel cells is a gas porous sheet of fibrous material adapted to be sandwiched between a cell electrode and a nonporous, gas impervious flat plate which separates adjacent cells. The porous holder has channels in one surface with coolant tubes disposed therein for carrying coolant through the stack. The gas impervious plate is preferably bonded to the opposite surface of the holder, and the channel depth is the full thickness of the holder.

  8. X-ray tube with magnetic electron steering

    DOE Patents [OSTI]

    Reed, Kim W. (Albuquerque, NM); Turman, Bobby N. (Albuquerque, NM); Kaye, Ronald J. (Albuquerque, NM); Schneider, Larry X. (Albuquerque, NM)

    2000-01-01

    An X-ray tube uses a magnetic field to steer electrons. The magnetic field urges electrons toward the anode, increasing the proportion of electrons emitted from the cathode that reach desired portions of the anode and consequently contribute to X-ray production. The magnetic field also urges electrons reflected from the anode back to the anode, further increasing the efficiency of the tube.

  9. System and method employing a minimum distance and a load feature database to identify electric load types of different electric loads

    DOE Patents [OSTI]

    Lu, Bin; Yang, Yi; Sharma, Santosh K; Zambare, Prachi; Madane, Mayura A

    2014-12-23

    A method identifies electric load types of a plurality of different electric loads. The method includes providing a load feature database of a plurality of different electric load types, each of the different electric load types including a first load feature vector having at least four different load features; sensing a voltage signal and a current signal for each of the different electric loads; determining a second load feature vector comprising at least four different load features from the sensed voltage signal and the sensed current signal for a corresponding one of the different electric loads; and identifying by a processor one of the different electric load types by determining a minimum distance of the second load feature vector to the first load feature vector of the different electric load types of the load feature database.

  10. 1993 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1993-12-01

    The Loads and Resources Study is presented in three documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The forecasted future electricity demands -- firm loads -- are subtracted from the projected capability of existing and {open_quotes}contracted for{close_quotes} resources to determine whether Bonneville Power Administration (BPA) and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, and additional conservation, contract purchases, or generating resources will be needed to meet load growth. The Pacific Northwest Loads and Resources Study analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resource in addition to the Federal system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. This study presents the Federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1994--95 through 2003--04.

  11. Methods for batch fabrication of cold cathode vacuum switch tubes

    DOE Patents [OSTI]

    Walker, Charles A.; Trowbridge, Frank R.

    2011-05-10

    Methods are disclosed for batch fabrication of vacuum switch tubes that reduce manufacturing costs and improve tube to tube uniformity. The disclosed methods comprise creating a stacked assembly of layers containing a plurality of adjacently spaced switch tube sub-assemblies aligned and registered through common layers. The layers include trigger electrode layer, cathode layer including a metallic support/contact with graphite cathode inserts, trigger probe sub-assembly layer, ceramic (e.g. tube body) insulator layer, and metallic anode sub-assembly layer. Braze alloy layers are incorporated into the stacked assembly of layers, and can include active metal braze alloys or direct braze alloys, to eliminate costs associated with traditional metallization of the ceramic insulator layers. The entire stacked assembly is then heated to braze/join/bond the stack-up into a cohesive body, after which individual switch tubes are singulated by methods such as sawing. The inventive methods provide for simultaneously fabricating a plurality of devices as opposed to traditional methods that rely on skilled craftsman to essentially hand build individual devices.

  12. Recomplete deep hot wells successfully with coiled tubing

    SciTech Connect (OSTI)

    Garner, T.; Fleckenstein, W.; Shelley, B.

    1995-06-01

    A squeeze reperforation procedure in the Elk Hills, California field using coiled tubing included contaminating excess cement and jetting it from the well bore to eliminate the need to drill out cement before shooting new perforations. The 324-7R well was producing 260 b/d of oil through 2 7/8-in. production tubing, with a 20,000-scf/bbl gas-oil ratio (GOR). Bottomhole static temperature was 250 F. After pumping a cement squeeze to 9,000 ft trough 1{1/2}-in. coiled tubing (CT) run inside the production tubing, oil production increased to 550 b/d of oil, and the GOR decreased to 5,000 scf/bbl when new perforations were shot. Cement was pumped 9,000 ft through the CT and circulated back through the production tubing/CT annulus. Operation cost was estimated at 20% less than for a comparable job performance with conventional tubing. Cost of the CT squeeze was recovered by 58 days incremental production.

  13. Logging with coiled tubing less effective than with drill pipe

    SciTech Connect (OSTI)

    Van Den Bosch, R. )

    1994-01-31

    Coiled tubing offered neither economic nor operational advantages over drill pipe for conveying logging tools in open hole shallow horizontal wells in Germany. In the past 2 years, Mobil Erdgas-Erdoel GMbH (MEEG) participated in completing eight shallow horizontal wells. These were medium-to-short radius wells at measured depths of between 850 and 2,000 m. The average horizontal section was 350 m. The logging tools were conveyed by coiled tubing or drill pipe. MEEG attempted to log five wells with coiled tubing-conveyed tools, four with 1 1/2-in. tubing. Total depth was reached reliably in only one well, the shallowest and with the shortest horizontal section. Simulation programs were unreliable for calculating the downhole forces of the coil/tool combination or predicting possible helical lockups. In wells with drill pipe-conveyed logs, the tool combination could always be pushed to total depth, and the operations were generally faster and cost less than logging with coiled tubing. Also, drill pipe allowed longer and heavier tool strings. For reliable operations, coiled tubing needs to be more rigid, rig-up/rig-down times need to be improved, and the simulation programs must be more reliable for predicting downhole lock-up.

  14. APS high heat load monochromator

    SciTech Connect (OSTI)

    Lee, W.K.; Mills, D.

    1993-02-01

    This document contains the design specifications of the APS high heat load (HHL) monochromator and associated accessories as of February 1993. It should be noted that work is continuing on many parts of the monochromator including the mechanical design, crystal cooling designs, etc. Where appropriate, we have tried to add supporting documentation, references to published papers, and calculations from which we based our decisions. The underlying philosophy behind performance specifications of this monochromator was to fabricate a device that would be useful to as many APS users as possible, that is, the design should be as generic as possible. In other words, we believe that this design will be capable of operating on both bending magnet and ID beamlines (with the appropriate changes to the cooling and crystals) with both flat and inclined crystal geometries and with a variety of coolants. It was strongly felt that this monochromator should have good energy scanning capabilities over the classical energy range of about 4 to 20 keywith Si (111) crystals. For this reason, a design incorporating one rotation stage to drive both the first and second crystals was considered most promising. Separate rotary stages for the first and second crystals can sometimes provide more flexibility in their capacities to carry heavy loads (for heavily cooled first crystals or sagittal benders of second crystals), but their tuning capabilities were considered inferior to the single axis approach.

  15. Low reflectance radio frequency load

    DOE Patents [OSTI]

    Ives, R. Lawrence; Mizuhara, Yosuke M

    2014-04-01

    A load for traveling microwave energy has an absorptive volume defined by cylindrical body enclosed by a first end cap and a second end cap. The first end cap has an aperture for the passage of an input waveguide with a rotating part that is coupled to a reflective mirror. The inner surfaces of the absorptive volume consist of a resistive material or are coated with a coating which absorbs a fraction of incident RF energy, and the remainder of the RF energy reflects. The angle of the reflector and end caps is selected such that reflected RF energy dissipates an increasing percentage of the remaining RF energy at each reflection, and the reflected RF energy which returns to the rotating mirror is directed to the back surface of the rotating reflector, and is not coupled to the input waveguide. Additionally, the reflector may have a surface which generates a more uniform power distribution function axially and laterally, to increase the power handling capability of the RF load. The input waveguide may be corrugated for HE11 mode input energy.

  16. Flight Path Target 2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - Scientific Applications Target 2 provides experimenters direct access to the 800 MeV proton beam as well as several flight paths. Target 2 is located in MPF-7 at LANSCE.. Lead Slowing Down Spectrometer lsds1 LSDS with cadmium sheets on the outside to reduce room-return neutrons. The Blue Room is the shield structure and experiment housing building around Target 2. The Lead Slowing Down Spectrometer (LSDS) installed in the Blue Room at the Los Alamos Science Center is a 20-ton cube of lead

  17. The effect of voltage waveform and tube diameter on transporting cold plasma strings through a flexible dielectric tube

    SciTech Connect (OSTI)

    Sohbatzadeh, Farshad; Omran, Azadeh Valinataj

    2014-11-15

    In this work, we developed transporting atmospheric pressure cold plasma using single electrode configuration through a sub-millimetre flexible dielectric tube beyond 100?cm. It was shown that the waveform of the applied high voltage is essential for controlling upstream and downstream plasma inside the tube. In this regard, sawtooth waveform enabled the transport of plasma with less applied high voltage compared to sinusoidal and pulsed form voltages. A cold plasma string as long as 130?cm was obtained by only 4?kV peak-to-peak sawtooth high voltage waveform. Optical emission spectroscopy revealed that reactive chemical species, such as atomic oxygen and hydroxyl, are generated at the tube exit. The effect of tube diameter on the transported plasma was also examined: the smaller the diameter, the higher the applied voltage. The device is likely to be used for sterilization, decontamination, and therapeutic endoscopy as already suggested by other groups in recent past years.

  18. High payload six-axis load sensor

    DOE Patents [OSTI]

    Jansen, John F.; Lind, Randall F.

    2003-01-01

    A repairable high-payload six-axis load sensor includes a table, a base, and at least three shear-pin load transducers removably mounted between the table and the base. Removable mounting permits easy replacement of damaged shear pins. Preferably, the shear-pin load transducers are responsive to shear forces imparted along the two axes perpendicular to an axis of minimum sensitivity characteristic of the transducer. Responsive to an applied shear force, each shear-pin load transducer can produce an electrical signal proportional to the reaction force. The load sensor can further include a structure for receiving the proportional electrical signals and computing the applied load corresponding to the proportional electrical signals. The computed load can be expressed in terms of a three-dimensional XYZ Cartesian coordinate system.

  19. SU-E-I-25: Determining Tube Current, Tube Voltage and Pitch Suitable for Low- Dose Lung Screening CT

    SciTech Connect (OSTI)

    Williams, K; Matthews, K

    2014-06-01

    Purpose: The quality of a computed tomography (CT) image and the dose delivered during its acquisition depend upon the acquisition parameters used. Tube current, tube voltage, and pitch are acquisition parameters that potentially affect image quality and dose. This study investigated physicians' abilities to characterize small, solid nodules in low-dose CT images for combinations of current, voltage and pitch, for three CT scanner models. Methods: Lung CT images was acquired of a Data Spectrum anthropomorphic torso phantom with various combinations of pitch, tube current, and tube voltage; this phantom was used because acrylic beads of various sizes could be placed within the lung compartments to simulate nodules. The phantom was imaged on two 16-slice scanners and a 64-slice scanner. The acquisition parameters spanned a range of estimated CTDI levels; the CTDI estimates from the acquisition software were verified by measurement. Several experienced radiologists viewed the phantom lung CT images and noted nodule location, size and shape, as well as the acceptability of overall image quality. Results: Image quality for assessment of nodules was deemed unsatisfactory for all scanners at 80 kV (any tube current) and at 35 mA (any tube voltage). Tube current of 50 mA or more at 120 kV resulted in similar assessments from all three scanners. Physician-measured sphere diameters were closer to actual diameters for larger spheres, higher tube current, and higher kV. Pitch influenced size measurements less for larger spheres than for smaller spheres. CTDI was typically overestimated by the scanner software compared to measurement. Conclusion: Based on this survey of acquisition parameters, a low-dose CT protocol of 120 kV, 50 mA, and pitch of 1.4 is recommended to balance patient dose and acceptable image quality. For three models of scanners, this protocol resulted in estimated CTDIs from 2.93.6 mGy.

  20. Multiple shell fusion targets

    DOE Patents [OSTI]

    Lindl, J.D.; Bangerter, R.O.

    1975-10-31

    Multiple shell fusion targets for use with electron beam and ion beam implosion systems are described. The multiple shell targets are of the low-power type and use a separate relatively low Z, low density ablator at large radius for the outer shell, which reduces the focusing and power requirements of the implosion system while maintaining reasonable aspect ratios. The targets use a high Z, high density pusher shell placed at a much smaller radius in order to obtain an aspect ratio small enough to protect against fluid instability. Velocity multiplication between these shells further lowers the power requirements. Careful tuning of the power profile and intershell density results in a low entropy implosion which allows breakeven at low powers. For example, with ion beams as a power source, breakeven at 10-20 Terrawatts with 10 MeV alpha particles for imploding a multiple shell target can be accomplished.

  1. Influence of stress intensity and loading mode on intergranular stress corrosion cracking of Alloy 600 in primary waters of pressurized water reactors

    SciTech Connect (OSTI)

    Rebak, R.B.; Szklarska-Smialowska, Z. . Fontana Corrosion Center)

    1994-05-01

    The steam generator in a pressurized water reactor (PWR) of a nuclear power plant consists mainly of a shell made of carbon (C) steel and tubes made of alloy 600 (UNS N06600). However, alloy 600 suffers environmentally induced cracking with exposure to high-temperature primary water. The susceptibility of alloy 600 to integranular stress corrosion cracking (IGSCC) was investigated as a function of the level of applied stresses and mode of loading. Constant load tests were conducted with specimens prepared from thin wall tubes, and constant deformation tests were conducted using specimens prepared from plates. With tubes exposed to primary water at 330 C, the crack propagation rate (CPR) was found to increase from 1 [times] 10[sup [minus]11] m/s at a stress intensity (K[sub i]) of 10 MPa[radical]m to 1 [times] 10[sup [minus]9] at K[sub i] = 60 MPa[radical]m. CPR obtained using compact specimens prepared from plates were 1 order of magnitude lower than values measured in tubes at the same temperature and in the same solution at each stress intensity. The corollary was that values of crack propagation and threshold stress intensities obtained using compact specimens could not be extrapolated to the behavior of thin wall tubes.

  2. Apparatus and method for controlling heat transfer between a fluidized bed and tubes immersed therein

    DOE Patents [OSTI]

    Hodges, James L. (3 Hilltop Ave., Vernon, CT 06066); Cerkanowicz, Anthony E. (8 Fieldstone Dr., Livingston, NJ 07039)

    1983-01-01

    In a fluidized bed of solid particles having one or more heat exchange tubes immersed therein, the rate of heat transfer between the fluidized particles and a fluid flowing through the immersed heat exchange tubes is controlled by rotating an arcuate shield apparatus about each tube to selectively expose various portions of the tube to the fluidized particles.

  3. Apparatus and method for controlling heat transfer between a fluidized bed and tubes immersed therein

    DOE Patents [OSTI]

    Hodges, James L. (3 Hilltop Ave., Vernon, CT 06066); Cerkanowicz, Anthony E. (8 Fieldstone Dr., Livingston, NJ 07039)

    1982-01-01

    In a fluidized bed of solid particles having one or more heat exchange tubes immersed therein, the rate of heat transfer between the fluidized particles and a fluid flowing through the immersed heat exchange tubes is controlled by rotating an arcuate shield apparatus about each tube to selectively expose various portions of the tube to the fluidized particles.

  4. An evaluation of large diameter coiled tubing for subsurface production tubulars

    SciTech Connect (OSTI)

    Adams, L.S.; Smith, L.W.

    1995-12-31

    This paper provides an economic and technological perspective for use of large diameter coiled tubing relative to threaded tubulars for subsurface production tubing. This new advancement in coiled tubing technology can significantly reduce the expense for purchasing and installing production tubing while increasing hydrocarbon reserve recovery and providing a safer, more desirable ecosystem interrelation.

  5. Method for loading shape memory polymer gripper mechanisms (Patent...

    Office of Scientific and Technical Information (OSTI)

    Method for loading shape memory polymer gripper mechanisms Title: Method for loading shape memory polymer gripper mechanisms A method and apparatus for loading deposit material, ...

  6. Apparatus for loading shape memory gripper mechanisms (Patent...

    Office of Scientific and Technical Information (OSTI)

    Apparatus for loading shape memory gripper mechanisms Title: Apparatus for loading shape memory gripper mechanisms A method and apparatus for loading deposit material, such as an ...

  7. Bulk Modulus Capacitor Load Cells

    SciTech Connect (OSTI)

    Dickey, C.E.

    1990-04-01

    Measurement of forces present at various locations within the SSC Model Dipole collared coil assembly is of great practical interest to development engineers. Of particular interest are the forces between coils at the parting plane and forces that exist between coils and pole pieces. It is also desired to observe these forces under the various conditions that a magnet will experience such as: during the collaring process, post-collaring, under the influence of cryogens, and during field excitation. A twenty eight thousandths of an inch thick capacitor load cell which utilizes the hydrostatic condition of a stressed plastic dielectric has been designed. These cells are currently being installed on SSC Model Dipoles. The theory, development, and application of these cells will be discussed.

  8. peak_load_2010.xls

    U.S. Energy Information Administration (EIA) Indexed Site

    2. Noncoincident Peak Load, by North American Electric Reliability Corporation Assessment Area, 1990-2010 Actual, 2011-2015 Projected (Megawatts) Interconnection NERC Regional Assesment Area 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 FRCC 27,266 28,818 30,601 32,823 32,904 34,524 35,444 35,375 38,730 37,493 37,194 39,062 40,696 40,475 42,383 46,396 45,751 46,676 44,836 NPCC 44,116 46,594 43,658 46,706 47,581 47,705 45,094 49,269 49,566 52,855

  9. Crimp sealing of tubes flush with or below a fixed surface

    DOE Patents [OSTI]

    Fischer, Jon E.; Walmsley, Don; Wapman, P. Derek

    1996-01-01

    An apparatus for crimp sealing and severing tubes flush or below a fixed surface. Tube crimping below a fixed surface requires an asymmetric die and anvil configuration. The anvil must be flat so that, after crimping, it may be removed without deforming the crimped tubes. This asymmetric die and anvil is used when a ductile metal tube and valve assembly are attached to a pressure vessel which has a fixed surface around the base of the tube at the pressure vessel. A flat anvil is placed against the tube. Die guides are placed against the tube on a side opposite the anvil. A pinch-off die is inserted into the die guides against the tube. Adequate clearance for inserting the die and anvil around the tube is needed below the fixed surface. The anvil must be flat so that, after crimping, it may be removed without deforming the crimped tubes.

  10. Crimp sealing of tubes flush with or below a fixed surface

    DOE Patents [OSTI]

    Fischer, J.E.; Walmsley, D.; Wapman, P.D.

    1996-08-20

    An apparatus for crimp sealing and severing tubes flush or below a fixed surface. Tube crimping below a fixed surface requires an asymmetric die and anvil configuration. The anvil must be flat so that, after crimping, it may be removed without deforming the crimped tubes. This asymmetric die and anvil is used when a ductile metal tube and valve assembly are attached to a pressure vessel which has a fixed surface around the base of the tube at the pressure vessel. A flat anvil is placed against the tube. Die guides are placed against the tube on a side opposite the anvil. A pinch-off die is inserted into the die guides against the tube. Adequate clearance for inserting the die and anvil around the tube is needed below the fixed surface. The anvil must be flat so that, after crimping, it may be removed without deforming the crimped tubes. 8 figs.

  11. Applying a tapered electrode on a porous ceramic support tube by masking a band inside the tube and drawing in electrode material from the outside of the tube by suction

    DOE Patents [OSTI]

    Vasilow, T.R.; Zymboly, G.E.

    1991-12-17

    An electrode is deposited on a support by providing a porous ceramic support tube having an open end and closed end; masking at least one circumferential interior band inside the tube; evacuating air from the tube by an evacuation system, to provide a permeability gradient between the masked part and unmasked part of the tube; applying a liquid dispersion of solid electrode particles to the outside surface of the support tube, where liquid flows through the wall, forming a uniform coating over the unmasked support part and a tapered coating over the masked part. 2 figures.

  12. Applying a tapered electrode on a porous ceramic support tube by masking a band inside the tube and drawing in electrode material from the outside of the tube by suction

    DOE Patents [OSTI]

    Vasilow, Theodore R.; Zymboly, Gregory E.

    1991-01-01

    An electrode is deposited on a support by providing a porous ceramic support tube (10) having an open end (14) and closed end (16); masking at least one circumferential interior band (18 and 18') inside the tube; evacuating air from the tube by an evacuation system (30), to provide a permeability gradient between the masked part (18 and 18') and unmasked part (20) of the tube; applying a liquid dispersion of solid electrode particles to the outside surface of the support tube, where liquid flows through the wall, forming a uniform coating (42) over the unmasked support part (20) and a tapered coating over the masked part (18 and 18').

  13. Signature of the Fragmentation of a Color Flux Tube

    SciTech Connect (OSTI)

    Wong, Cheuk-Yin

    2015-10-07

    The production of quark-antiquark pairs along a color flux tube precedes the fragmentation of the tube. Because of the local conservation of momentum and charge, the production of a $q$-$\\bar q$ pair will lead to correlations of adjacently produced mesons (mostly pions). Adjacently produced pions however can be signalled by the their rapidity difference $\\Delta y$ falling within the window of $|\\Delta y | < 1/(dN_\\pi/dy)$, on account of the space-time-rapidity ordering of produced pions in a flux tube fragmentation. Therefore, the local conservation of momentum will lead to a suppression of azimuthal two-pion correlation $dN/(d\\Delta \\phi\\, d\\Delta y)$ on the near side at $(\\Delta \\phi, \\Delta y) \\sim 0$, but an enhanced azimuthal correlation on the back-to-back, away side at $(\\Delta \\phi$$\\sim$$ \\pi,\\Delta y$$\\sim$0). Similarly, in a flux tube fragmentation, the local conservation of charge will forbid the production of like charge pions within $|\\Delta y | < 1/(dN_\\pi/dy)$, but there is no such prohibition for $|\\Delta y| >1/(dN_\\pi/dy)$. These properties may be used as the signature for the fragmentation of a color flux tube.

  14. Disposal of Draeger Tubes at Savannah River Site

    SciTech Connect (OSTI)

    Malik, N.P.

    2000-10-13

    The Savannah River Site (SRS) is a Department of Energy (DOE) facility located in Aiken, South Carolina that is operated by the Westinghouse Savannah River Company (WSRC). At SRS Draeger tubes are used to identify the amount and type of a particular chemical constituent in the atmosphere. Draeger tubes rely on a chemical reaction to identify the nature and type of a particular chemical constituent in the atmosphere. Disposal practices for these tubes were identified by performing a hazardous waste evaluation per the Resource Conservation and Recovery Act (RCRA). Additional investigations were conducted to provide guidance for their safe handling, storage and disposal. A list of Draeger tubes commonly used at SRS was first evaluated to determine if they contained any material that could render them as a RCRA hazardous waste. Disposal techniques for Draeger tubes that contained any of the toxic contaminants listed in South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-79. 261.24 (b) and/or contained an acid in the liquid form were addressed.

  15. Signature of the Fragmentation of a Color Flux Tube

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Wong, Cheuk-Yin

    2015-10-07

    The production of quark-antiquark pairs along a color flux tube precedes the fragmentation of the tube. Because of the local conservation of momentum and charge, the production of amore » $q$-$$\\bar q$$ pair will lead to correlations of adjacently produced mesons (mostly pions). Adjacently produced pions however can be signalled by the their rapidity difference $$\\Delta y$$ falling within the window of $$|\\Delta y | < 1/(dN_\\pi/dy)$$, on account of the space-time-rapidity ordering of produced pions in a flux tube fragmentation. Therefore, the local conservation of momentum will lead to a suppression of azimuthal two-pion correlation $$dN/(d\\Delta \\phi\\, d\\Delta y)$$ on the near side at $$(\\Delta \\phi, \\Delta y) \\sim 0$$, but an enhanced azimuthal correlation on the back-to-back, away side at $$(\\Delta \\phi$$$$\\sim$$$$ \\pi,\\Delta y$$$$\\sim$$0). Similarly, in a flux tube fragmentation, the local conservation of charge will forbid the production of like charge pions within $$|\\Delta y | < 1/(dN_\\pi/dy)$$, but there is no such prohibition for $$|\\Delta y| >1/(dN_\\pi/dy)$$. These properties may be used as the signature for the fragmentation of a color flux tube.« less

  16. Reducing the risk, complexity and cost of coiled tubing drilling

    SciTech Connect (OSTI)

    Portman, L.

    1999-07-01

    Drilling vertical well extensions with coiled tubing, particularly in the underbalanced state, exploits the inherent strengths of coiled tubing including: The ability to enter slim holes against a live well head; The use of small equipment that is fast to rig up and down; and The ability to trip quickly and maintain a steady pressure downhole with continuous circulation. Coiled tubing has successfully been used to deepen hundreds of wells, yet this application has only received sporadic attention. There are some very important technical considerations when drilling non-directionally with coiled tubing that must be addressed to ensure a commercially successful job. A recent vertical drilling job carried out in Western Australia illustrates the critical engineering aspects of an underbalanced, non-directional, coiled tubing drilling job. This job was completed for Arc Energy in April 1999 and produced a well that stabilized at 1.1 MMcfd, where three other wells drilled conventionally into these zones had shown only trace amounts of hydrocarbon.

  17. Multiaxial plasticity and fatigue life prediction in coiled tubing

    SciTech Connect (OSTI)

    Tipton, S.M.

    1996-12-31

    Coiled tubing is being used increasingly in the oil well drilling and servicing industry. Continuous steel tubing of structural dimensions (up to 89 mm or 3.5 in. in diameter) is wound onto a large-diameter reel for repeated deployment into and out of a well bore. The bending strain range associated with each wrap-unwrap cycle can exceed 3% with lives well below 100 cycles. During constant internal pressure fatigue testing, tubing has been observed to grow in diameter by as much as 30%. This paper describes an analytical model to predict the fatigue behavior of coiled tubing subjected to variable pressure service conditions. The approach utilizes standard low-cycle fatigue data but requires additional experimental results from constant pressure fatigue testing. The algorithm is based on estimates of biaxial ratcheting from an incremental plasticity model using a hybrid associated flow rule, a modified kinematic hardening rule with multiple von Mises yield surfaces, and a specialized limit surface concept. An empirical damage parameter was formulated based on constant pressure fatigue data using mean and fluctuating von Mises equivalent strain components occurring throughout the life of a section of tubing. This parameters is used with the Palmgren-Miner definition of cumulative damage to track damage that is accumulating nonlinearly under constant or variable pressure histories. Modifications to standard incremental plasticity components and implementation assumptions used to apply the model are presented and discussed. The predictive capability of the model is demonstrated relative to data generated under constant and variable pressure histories.

  18. Case studies from Oman for coiled tubing deployed completion techniques

    SciTech Connect (OSTI)

    Taylor, R.W.; Conrad, B.

    1996-09-01

    Although the use of ultra-large coiled tubing to complete wells is relatively new, it is gaining widespread industry application. This paper will detail the equipment necessary to perform an operation of this type and will present information from several case studies in Oman in which an operator has successfully deployed completion equipment on 3-1/2-inch-OD coiled tubing. In addition to a discussion of the equipment required to perform the necessary operations, the trial parameters that were established by this operator will be given. The information presented has been selected to allow an initial evaluation to be made of coiled tubing completions in general and will help to determine whether this method can prove to be less expensive than traditional rig-based completions. The topics presented have been chosen to provide the reader with a thorough understanding of the techniques and preparation needed to execute a coiled tubing completion. The summary of experiences will conclude that this innovative completion technique can be a viable method for completing wells. Although long-term advantages regarding production and well maintenance cannot yet be determined, the operator`s experiences to date have confirmed his initial belief that use of coiled tubing in ultra-large continuous-pipe applications can be cost effective.

  19. Load research manual. Volume 2. Fundamentals of implementing load research procedures

    SciTech Connect (OSTI)

    Brandenburg, L.; Clarkson, G.; Grund, Jr., C.; Leo, J.; Asbury, J.; Brandon-Brown, F.; Derderian, H.; Mueller, R.; Swaroop, R.

    1980-11-01

    This three-volume manual presents technical guidelines for electric utility load research. Special attention is given to issues raised by the load data reporting requirements of the Public Utility Regulatory Policies Act of 1978 and to problems faced by smaller utilities that are initiating load research programs. In Volumes 1 and 2, procedures are suggested for determining data requirements for load research, establishing the size and customer composition of a load survey sample, selecting and using equipment to record customer electricity usage, processing data tapes from the recording equipment, and analyzing the data. Statistical techniques used in customer sampling are discussed in detail. The costs of load research also are estimated, and ongoing load research programs at three utilities are described. The manual includes guides to load research literature and glossaries of load research and statistical terms.

  20. Enterprise Assessments Targeted Review of the Targeted Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    components across the DOE complex. PDF icon Enterprise Assessments Targeted Review of the Targeted Review of the Safety Significant Ventilation System and Interconnected Portions ...

  1. A comparison of the heat transfer and pressure drop performance of R-134a-lubricant mixtures in different diameter smooth tubes and micro-fin tubes

    SciTech Connect (OSTI)

    Eckels, S.J.; Doerr, T.M.; Pate, M.B.

    1998-10-01

    The average heat transfer coefficients and pressure drops during evaporation and condensation are reported for mixtures of R-134a and an ester lubricant in tubes of 12.7 mm (1/2 in.) outer diameter. The objective of this paper is to evaluate the performance of the R-134a-lubricant mixtures in these tubes and determine the performance benefits of the micro-fin tube. The performance benefits of the tubes with 12.7 mm (1/2 in.) outer diameter are compared to those of smaller tubes with 9.52 mm (3/8 in.) outer diameter. The lubricant used was a 169 SUS penta erythritol ester mixed-acid lubricant. The lubricant concentration was varied from 0--5.1% in the mixture. The average heat transfer coefficients in the 12.7 mm (1/2 in.) micro-fin tube were 50--150% higher than those for the 12.7 mm (1/2 in.) smooth tube, while pressure drops in the micro-fin tube were 5% to 50% higher than in the smooth tube. The addition of lubricant degraded the average heat transfer coefficients in all cases except during evaporation at low lubricant concentrations. Pressure drops were always increased with the addition of lubricant. The experimental results also indicate that tube diameter has some effect on the performance benefits of the micro-fin tube over that of the smooth tube.

  2. Cooled particle accelerator target

    DOE Patents [OSTI]

    Degtiarenko, Pavel V.

    2005-06-14

    A novel particle beam target comprising: a rotating target disc mounted on a retainer and thermally coupled to a first array of spaced-apart parallel plate fins that extend radially inwardly from the retainer and mesh without physical contact with a second array of spaced-apart parallel plate fins that extend radially outwardly from and are thermally coupled to a cooling mechanism capable of removing heat from said second array of spaced-apart fins and located within the first array of spaced-apart parallel fins. Radiant thermal exchange between the two arrays of parallel plate fins provides removal of heat from the rotating disc. A method of cooling the rotating target is also described.

  3. Simplified Space Conditioning in Low Load Homes

    Energy Savers [EERE]

    Simplified Space Conditioning in Low Load Homes Andrew Poerschke IBACOS, Inc. BA Webinar October, 2014 Overview * Define the problem * Define thermal comfort * Discuss solutions * Case Studies - Cold Climate Unoccupied Lab House - Hot Climate Occupied Test House Smaller Loads, same size home 7 Tons 2800 CFM 3663 sq ft 3 Tons 1200 CFM 3663 sq ft Benchmark ZERH Here is the problem - Though loads are smaller, same floor plan and geometry makes it difficult to condition space with less CFM. -

  4. Minimum Day Time Load Calculation and Screening

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric Grid Using a Dynamically Controlled Battery Bank for Peak Load Shaving (Conference) | SciTech Connect Minimization of Impact from Electric Vehicle Supply Equipment to the Electric Grid Using a Dynamically Controlled Battery Bank for Peak Load Shaving Citation Details In-Document Search Title: Minimization of Impact from Electric Vehicle Supply Equipment to the Electric Grid Using a Dynamically Controlled Battery Bank for Peak Load Shaving This research presents a comparison of two

  5. Foam encapsulated targets

    DOE Patents [OSTI]

    Nuckolls, John H. (Livermore, CA); Thiessen, Albert R. (Livermore, CA); Dahlbacka, Glen H. (Livermore, CA)

    1983-01-01

    Foam encapsulated laser-fusion targets wherein a quantity of thermonuclear fuel is embedded in low density, microcellular foam which serves as an electron conduction channel for symmetrical implosion of the fuel by illumination of the target by one or more laser beams. The fuel, such as DT, is contained within a hollow shell constructed of glass, for example, with the foam having a cell size of preferably no greater than 2 .mu.m, a density of 0.065 to 0.6.times.10.sup.3 kg/m.sup.3, and external diameter of less than 200 .mu.m.

  6. Targeted polypeptide degradation

    DOE Patents [OSTI]

    Church, George M.; Janse, Daniel M.

    2008-05-13

    This invention pertains to compositions, methods, cells and organisms useful for selectively localizing polypeptides to the proteasome for degradation. Therapeutic methods and pharmaceutical compositions for treating disorders associated with the expression and/or activity of a polypeptide by targeting these polypeptides for degradation, as well as methods for targeting therapeutic polypeptides for degradation and/or activating therapeutic polypeptides by degradation are provided. The invention provides methods for identifying compounds that mediate proteasome localization and/or polypeptide degradation. The invention also provides research tools for the study of protein function.

  7. explicit representation of uncertainty in system load

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    system load - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & ... Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear ...

  8. Combi Systems for Low Load homes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Context Technical Approach * A condensing water heater and hydronic air handler will used to provide space and water heating loads in almost 300 weatherized homes. * System ...

  9. Active Load Control Techniques for Wind Turbines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Active Load Control Techniques for Wind Turbines Scott J. Johnson and C. P. "Case" van Dam Department of Mechanical and Aeronautical Engineering University of California One ...

  10. Building Technologies Office Load Control Strategies

    Broader source: Energy.gov [DOE]

    BTO researches and implements load control strategies, which support the Sustainable and Holistic IntegratioN of Energy storage and Solar PV (SHINES) FOA.

  11. Minimum Day Time Load Calculation and Screening

    Broader source: Energy.gov (indexed) [DOE]

    ... DPU 36 Supplemental Review Screens * Penetration screen (Minimum load screen) * Power quality and voltage screen * Safety and reliability screen 37 Federal Energy Regulatory ...

  12. Minimum Day Time Load Calculation and Screening

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... type of load? (Residential, Commercial, Industrial, mix)? Find nearby feeders (Feeder 2) of similar type and determine the ratio of Feeder 2 peak to capture profile shape ...

  13. History of Load Participation in ERCOT

    SciTech Connect (OSTI)

    Patterson, Mark

    2011-10-25

    Presentation on demand integration by ERCOT for a DOE Workshop. Covers history of load participation in ERCOT from 2002 to present.

  14. Decades of Wind Turbine Load Simulation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Decades of Wind Turbine Load Simulation Matthew Barone , Joshua Paquette , Brian ... was used to simulate ninety-six years of operation of a five megawatt wind turbine. ...

  15. Pair creation in an electric flux tube and chiral anomaly

    SciTech Connect (OSTI)

    Iwazaki, Aiichi [International Economics and Politics, Nishogakusha University, Ohi Kashiwa, Chiba 277-8585 (Japan)

    2009-11-15

    Using the chiral anomaly, we discuss the pair creation of massless fermions under the effect of a magnetic field B-vector when an electric flux tube E-vector parallel to B-vector is switched on. The tube is axially symmetric and infinitely long. For the constraint B>>E, we can analytically obtain the spatial and temporal behaviors of the number density of the fermions, the azimuthal magnetic field generated by the fermions, and so on. We find that the lifetime t{sub c} of the electric field becomes shorter as the width of the tube becomes narrower. Applying it to the plasma in high-energy heavy-ion collisions, we find that the color electric field decays quickly such that t{sub c}{approx_equal}Q{sub s}{sup -1}, in which Q{sub s} is the saturation momentum.

  16. More collapse tests add to coiled tubing applications

    SciTech Connect (OSTI)

    Walker, E.J. ); Costall, D. )

    1991-06-17

    The collapse limits of thicker-walled coiled tubing have been determined to ensure safe and successful workover operations. Prudhoe Bay has been using 1.75-in OD coiled tubing for 2 years. When BP Exploration (Alaska) Inc. initially started using this larger size coil, collapse tests were run on 0.109-in. wall thickness coil. These tests provide a base curve by which much work has been performed in the western operating area of the Prudhoe Bay Unit. However, use of 1.75-in. coiled tubing has been expanded to include wall thickness of 0.125, 0.134, and 0.156-in. Except for theoretical calculations, no data were available to ensure that we would know the collapsed limitations for these sizes. To fill in this gap, further collapse testing has been done.

  17. Consumers' Gas lays coiled steel tubing in Lake Erie

    SciTech Connect (OSTI)

    Not Available

    1980-10-01

    Forty-four miles of polypropylene-coated, coiled steel tubing have been laid underwater by the Consumers' Gas Co. of Toronto. Laid in 33,000-ft sections from a giant reel, the tubing is used for the remote control of subsea hydraulically operated line valves and the distribution of methyl alcohol to subsea gas wells. The installation is the first of long, continuous tubing underwater using this technology in Canada. The line was installed in conjunction with a newly completed gas well gathering system and processing plant that is expected to yield more than 35 billion cu ft of fuel over the next 15 yr. The new system under W.-Central Lake Erie provides consumers with a cost-effective method for remotely controlling underwater hydraulic valves and distributing methyl alcohol to eliminate hydrate build-up in the gas gathering lines.

  18. Temperature dependence of wastage of in-bed tubes

    SciTech Connect (OSTI)

    Wright, I.G.; Sethi, V.K.; Stringer, J.

    1995-12-31

    Observations of the wastage of evaporator tubes immersed in combusting fluidized beds have suggested that a change in tube metal temperature, around the relatively narrow range of 300 to 400 C, can effect large changes in the rate and mode of tube wastage. A number of attempts has been made to reproduce this temperature dependence of metal wastage in the laboratory, with varying degrees of success. In this paper, the types of wastage temperature relationships developed by various research groups are reviewed in light of the erosion and corrosion conditions actually created in the laboratory simulations. In addition, the ability of the various scenarios proposed to explain this wastage phenomenon to rationalize the types of temperature dependence observed is examined.

  19. The effect of fluid flow on coiled tubing reach

    SciTech Connect (OSTI)

    Bhalla, K.; Walton, I.C.

    1996-12-31

    A critical parameter to the success of many coiled tubing (CT) operations in highly deviated or horizontal wells is the depth penetration that can be attained before the CT buckles and locks up. Achieving a desired depth is always critical in CT operations and attaining an additional reach of a few hundred feet can be crucial. This paper addresses the effect of fluid flow in the CT and in the CT/wellbore annulus on the state of force and stress in the CT, and thereby predicts its effect on the reach attainable by the CT. The flow of fluid through the CT and annulus between the CT and borehole modifies the pressures and the effective force which governs the mechanical stability of the CT. The net force per unit length due to fluid flow in the coiled tubing and annulus between the coiled tubing casing/well is calculated in terms of the shear stress and its effect on the onset of buckling and lockup is determined. The model is then implemented in a full tubing forces calculation and the effect of flowing fluids and producing fluids on reach is analyzed. The new model is utilized in the design of commercial jobs. The exact analytic model shows that fluid flow inside the CT has zero impact on reach, that downward flow in the annulus has a favourable impact, and upward flow in the annulus reduces the maximum attainable reach. Using the full tubing forces model, a coiled tubing job can be designed taking into account the flow of a fluid with a specified rheology, density and flow rate. Thus the feasibility of attaining a given reach can be more accurately determined. Results are presented in the form of the surface weight for commercial wells and compared to field jobs.

  20. Coiled tubing: Applications for today`s challenges

    SciTech Connect (OSTI)

    Connell, M.; Headrick, D.; Isennock, C.

    1999-07-01

    Although coiled tubing (CT) was introduced to the oil and gas industry in the 1960s, the product was used for little more than nitrogen jetting and sand removal for nearly two decades. Then, in the 1990s, the availability of CT with large diameters (up to 4 inch OD) and higher strength enabled its use for more complicated and demanding jobs. For the first time, CT could provide the high flow rates and withstand the pressures required for production tubulars, without a rig or hoist unit. The paper describes composite coiled tubing, fracturing, laying offshore flow lines, and a gas storage well cleanout, and a geothermal well cleanout.

  1. An overview of McKittrick coiled tubing drilling project

    SciTech Connect (OSTI)

    Ewert, D.P.; Ramagno, R.A.; Hurkmans, R.S.

    1995-12-31

    In an effort to reduce drilling costs on thermal wells, service companies began reducing casing sizes and well pad location sizes in 1993. Based on a successful four-well pilot project completed in early 1994 at the Belridge Field, a 115-well steam injector project was completed in the McKittrick Field in late 1994, of which 68 wells were drilled with coiled tubing. This paper will discuss why slimhole completions and coiled tubing drilling were selected for this project, the operational aspects of drilling 68 wells in 92 working days, and conclusions about the project.

  2. Continuation of Studies on Development of ODS Heat Exchanger Tubing

    SciTech Connect (OSTI)

    Lawrence Brown; David Workman; Bimal Kad; Gaylord Smith; Archie Robertson; Ian Wright

    2008-04-15

    The Department of Energy (DOE), National Energy Technology Center (NETL), has initiated a strategic plan for the development of advanced technologies needed to design and build fossil fuel plants with very high efficiency and environmental performance. These plants, referred to as 'Vision 21' and FutureGen programs by DOE, will produce electricity, chemicals, fuels, or a combination of these products, and possibly secondary products such as steam/heat for industrial use. MA956 is a prime candidate material being considered for a high temperature heat exchanger in the 'Vision 21' and FutureGen programs. This material is an oxide dispersion strengthened (ODS) alloy; however, there are some gaps in the data required to commit to the use of these alloys in a full-size plant. To fill the technology gaps for commercial production and use of the material for 'Advanced Power Generation Systems' this project has performed development activity to significant increase in circumferential strength of MA956 as compared to currently available material, investigated bonding technologies for bonding tube-to-tube joints through joining development, and performed tensile, creep and fire-side corrosion tests to validate the use and fabrication processes of MA956 to heat exchanger tubing applications. Development activities within this projected has demonstrated increased circumferential strength of MA956 tubes through flow form processing. Of the six fabrication technologies for bonding tube-to-tube joints, inertia friction welding (IFW) and flash butt welding (FBW) were identified as processes for joining MA956 tubes. Tensile, creep, and fire-side corrosion test data were generated for both base metal and weld joints. The data can be used for design of future systems employing MA956. Based upon the positive development activities, two test probes were designed and fabricated for field exposure testing at 1204 C ({approx}2200 F) flue gas. The probes contained tube portions with FBW and IFW welded MA956. Field testing of the probes and remaining heat exchanger design activity will be performed by Oak Ridge National Laboratory under DOE Contract DE-AC05-00OR22725.

  3. System and method employing a self-organizing map load feature database to identify electric load types of different electric loads

    DOE Patents [OSTI]

    Lu, Bin; Harley, Ronald G.; Du, Liang; Yang, Yi; Sharma, Santosh K.; Zambare, Prachi; Madane, Mayura A.

    2014-06-17

    A method identifies electric load types of a plurality of different electric loads. The method includes providing a self-organizing map load feature database of a plurality of different electric load types and a plurality of neurons, each of the load types corresponding to a number of the neurons; employing a weight vector for each of the neurons; sensing a voltage signal and a current signal for each of the loads; determining a load feature vector including at least four different load features from the sensed voltage signal and the sensed current signal for a corresponding one of the loads; and identifying by a processor one of the load types by relating the load feature vector to the neurons of the database by identifying the weight vector of one of the neurons corresponding to the one of the load types that is a minimal distance to the load feature vector.

  4. Method for forming a layer of synthetic corrosion products on tubing surfaces

    DOE Patents [OSTI]

    Lane, Michael H. (Clifton Park, NY); Salamon, Eugene J. M. (Clifton Park, NY)

    1996-01-01

    A method is provided for forming a synthetic corrosion product layer on tube surfaces. The method utilizes two dissimilar materials with different coefficients of thermal expansion. An object tube and sacrificial tube are positioned one inside the other such that an annular region is created between the two tubes' surfaces. A slurry of synthetic corrosion products is injected into this annular region and the assembly is heat treated. This heat causes the tubes to expand, the inner tube with the higher coefficient of expansion expanding more than the outer tube, thereby creating internal pressures which consolidate the corrosion products and adhere the corrosion products to the tubing surfaces. The sacrificial tube may then be removed by conventional chemical etching or mechanical methods.

  5. Workover well control. Part 4. Coiled-tubing pigs speed workover operations

    SciTech Connect (OSTI)

    Adams, N.

    1981-09-14

    Many workover operations can be completed quickly and efficiently by using coiled tubing instead of jointed tubing or conventional rigs. In general, coiled tubing is a continuous string of small-diameter tubing that can be run into the well without the necessity of making joint connections. The operations are safe, involve small amounts of rig time, and usually are more economical than other forms of concentric work. Coiled tubing work is usually conducted on producing wells, which necessitates pressure-control precautions. Applications for coiled tubing involve all aspects of workover operations except wire-line work. Coiled tubing can be used in initiating flow, cleaning out sand in tubing, and performing stimulation operations. In addition, drilling can be conducted with coiled tubing when down-hole motors are used.

  6. Tubing wastage in fluidized-bed coal combustors: Examinations of tubing from Test Series 2, NCB (IEA Grimethorpe) Ltd. Facility

    SciTech Connect (OSTI)

    Witherell, C.E.; Meisenheimer, R.G.

    1987-10-30

    This study of wasted heat-exchanger tubing from the Grimethorpe PFBC Facility was conducted to characterize affected fireside surfaces and identify the mechanism/s responsible. Examinations showed that the wasted surfaces are not typical of those produced by erosion alone, as oxide deposits are present on all surfaces. Continual exfoliation of the normally-protective oxide layer is probably responsible for a major portion of tubing wastage. There are also indications of direct metal loss occurring through a series of events wherein repeatd formation and exfoliation of surface oxides produce an irregular metal interface that is mechanically deformed during combustor operation. The cold-worked metal protrusions, or platelets, on the roughened surface readily fracture from the tubing wall and are lost into the bed. 27 refs., 23 figs., 3 tabs.

  7. Method for loading shape memory polymer gripper mechanisms

    DOE Patents [OSTI]

    Lee, Abraham P.; Benett, William J.; Schumann, Daniel L.; Krulevitch, Peter A.; Fitch, Joseph P.

    2002-01-01

    A method and apparatus for loading deposit material, such as an embolic coil, into a shape memory polymer (SMP) gripping/release mechanism. The apparatus enables the application of uniform pressure to secure a grip by the SMP mechanism on the deposit material via differential pressure between, for example, vacuum within the SMP mechanism and hydrostatic water pressure on the exterior of the SMP mechanism. The SMP tubing material of the mechanism is heated to above the glass transformation temperature (Tg) while reshaping, and subsequently cooled to below Tg to freeze the shape. The heating and/or cooling may, for example, be provided by the same water applied for pressurization or the heating can be applied by optical fibers packaged to the SMP mechanism for directing a laser beam, for example, thereunto. At a point of use, the deposit material is released from the SMP mechanism by reheating the SMP material to above the temperature Tg whereby it returns to its initial shape. The reheating of the SMP material may be carried out by injecting heated fluid (water) through an associated catheter or by optical fibers and an associated beam of laser light, for example.

  8. A cryostat to hold frozen-spin polarized HD targets in CLAS. HDice-II

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Lowry, Michael M.; Bass, Christopher D.; D'Angelo, Annalisa; Deur, Alexandre P.; Dezern, Gary L.; Hanretty, Charles; Ho, D.; Kageya, Tsuneo; Kashy, David H.; Khandaker, Mahbub A.; et al

    2016-01-07

    The design, fabrication, operation, and performance of a helium-3/4 dilution refrigerator and superconducting magnet system for holding a frozen-spin polarized hydrogen deuteride target in the Jefferson Laboratory CLAS detector during photon beam running is reported. The device operates both vertically (for target loading) and horizontally (for target bombardment). Moreover, the device proves capable of maintaining a base temperature of 50 mK and a holding field of 1 Tesla for extended periods.

  9. Apparatus for loading a band saw blade

    DOE Patents [OSTI]

    Reeves, S.R.

    1990-03-20

    A band saw blade is loaded between pairs of guide wheels upon tensioning the blade by guiding the blade between pairs of spaced guide plates which define converging slots that converge toward the guide wheels. The approach is particularly useful in loading blades on underwater band saw machines used to cut radioactive materials. 2 figs.

  10. Apparatus for loading a band saw blade

    DOE Patents [OSTI]

    Reeves, Steven R.

    1990-01-01

    A band saw blade is loaded between pairs of guide wheels upon tensioning the blade by guiding the blade between pairs of spaced guide plates which define converging slots that converge toward the guide wheels. The approach is particularly useful in loading blades on underwater band saw machines used to cut radioactive materials.

  11. 1997 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1997-12-01

    The 1997 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. Data detailing Pacific Northwest non-utility generating (NUG) resources is also available upon request. This analysis updates the 1996 pacific Northwest Loads and Resources Study, published in December 1996. In this loads and resources study, resource availability is compared with a medium forecast of electricity consumption. This document analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system which includes loads and resources in addition to the Federal system. This study presents the Federal system and regional analyses for the medium load forecast. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1998--99 through 2007--08.

  12. Strategies for Controlling Plug Loads. A Tool for Reducing Plug Loads in Commercial Buildings

    SciTech Connect (OSTI)

    Torcellini, Paul; Bonnema, Eric; Sheppy, Michael; Pless, Shanti

    2015-09-01

    Plug loads are often not considered as part of the energy savings measures in Commercial Buildings; however, they can account for up to 50% of the energy used in the building. These loads are numerous and often scattered throughout a building. Some of these loads are purchased by the owner and some designed into the building or the tenant finishes for a space. This document provides a strategy and a tool for minimizing these loads.

  13. In-tube heat transfer and pressure drop of R-134a and ester lubricant mixtures in a smooth tube and a micro-fin tube. Part 1: Evaporation

    SciTech Connect (OSTI)

    Eckels, S.J.; Doerr, T.M.; Pate, M.B.

    1994-12-31

    In-tube heat transfer coefficients and pressure drops during evaporation are reported for mixtures of refrigerant R-134a and a penta erythritol ester mixed-acid lubricant. The ester lubricant was tested at viscosities of 169 SUS and 369 SUS over a lubricant concentration range of 0% to 5% in both a smooth tube and a micro-fine tube. The average saturation temperature used was 1 C (33.8 F). Measurements were taken for the refrigerant-lubricant mixture over a mass flux range of 85 kg/m{sup 2}{center_dot}s (62,700 lb/ft{sup 2}{center_dot}h) to 375 kg/m{sup 2}{center_dot}s (276,640 lb/ft{sup 2}{center_dot}h) in test tubes with an outer diameter of 9.52 mm (3/8 in.). Heat transfer coefficients during evaporation increased at low concentrations of the 169-SUS ester lubricant and then dropped off at high lubricant concentrations in both the smooth tube and the micro-fin tube. The higher viscosity 369-SUS lubricant decreased the heat transfer coefficients in both tubes over the range of lubricant concentrations tested. Pressure drops during evaporation increased in both the smooth tube and the micro-fin tube with the addition of ester lubricant of either viscosity. The heat transfer coefficients for the micro-fin tube were 100% to 50% higher than those for the smooth tube, with the higher values occurring at low mass fluxes. Pressure drops in the micro-fin tube were 10% to 20% higher than those in the smooth tube.

  14. An Evaluation of the HVAC Load Potential for Providing Load Balancing Service

    SciTech Connect (OSTI)

    Lu, Ning

    2012-09-30

    This paper investigates the potential of providing aggregated intra-hour load balancing services using heating, ventilating, and air-conditioning (HVAC) systems. A direct-load control algorithm is presented. A temperature-priority-list method is used to dispatch the HVAC loads optimally to maintain consumer-desired indoor temperatures and load diversity. Realistic intra-hour load balancing signals were used to evaluate the operational characteristics of the HVAC load under different outdoor temperature profiles and different indoor temperature settings. The number of HVAC units needed is also investigated. Modeling results suggest that the number of HVACs needed to provide a {+-}1-MW load balancing service 24 hours a day varies significantly with baseline settings, high and low temperature settings, and the outdoor temperatures. The results demonstrate that the intra-hour load balancing service provided by HVAC loads meet the performance requirements and can become a major source of revenue for load-serving entities where the smart grid infrastructure enables direct load control over the HAVC loads.

  15. Using Utility Load Data to Estimate Demand for Space Cooling and Potential for Shiftable Loads

    SciTech Connect (OSTI)

    Denholm, P.; Ong, S.; Booten, C.

    2012-05-01

    This paper describes a simple method to estimate hourly cooling demand from historical utility load data. It compares total hourly demand to demand on cool days and compares these estimates of total cooling demand to previous regional and national estimates. Load profiles generated from this method may be used to estimate the potential for aggregated demand response or load shifting via cold storage.

  16. Method and apparatus for remote tube crevice detection by current and voltage probe resistance measurement

    DOE Patents [OSTI]

    Kikta, T.J.; Mitchell, R.D.

    1992-11-24

    A method and apparatus for determining the extent of contact between an electrically conducting tube and an electrically conductive tubesheet surrounding the tube, based upon the electrical resistance of the tube and tubesheet. A constant current source is applied to the interior of the electrically conducting tube by probes and a voltmeter is connected between other probes to measure the voltage at the point of current injection, which is inversely proportional to the amount of contact between the tube and tubesheet. Namely, the higher the voltage measured by the voltmeter, the less contact between the tube and tubesheet. 4 figs.

  17. Method and apparatus for remote tube crevice detection by current and voltage probe resistance measurement

    DOE Patents [OSTI]

    Kikta, Thomas J.; Mitchell, Ronald D.

    1992-01-01

    A method and apparatus for determining the extent of contact between an electrically conducting tube and an electrically conductive tubesheet surrounding the tube, based upon the electrical resistance of the tube and tubesheet. A constant current source is applied to the interior of the electrically conducting tube by probes and a voltmeter is connected between other probes to measure the voltage at the point of current injection, which is inversely proportional to the amount of contact between the tube and tubesheet. Namely, the higher the voltage measured by the voltmeter, the less contact between the tube and tubesheet.

  18. Development and quality assessments of commercial heat production of ATF FeCrAl tubes

    SciTech Connect (OSTI)

    Yamamoto, Yukinori

    2015-09-01

    Development and quality assessment of the 2nd generation ATF FeCrAl tube production with commercial manufacturers were conducted. The manufacturing partners include Sophisticated Alloys, Inc. (SAI), Butler, PA for FeCrAl alloy casting via vacuum induction melting, Oak Ridge National Laboratory (ORNL) for extrusion process to prepare the master bars/tubes to be tube-drawn, and Rhenium Alloys, Inc. (RAI), North Ridgeville, OH, for tube-drawing process. The masters bars have also been provided to Los Alamos National Laboratory (LANL) who works with Century Tubes, Inc., (CTI), San Diego, CA, as parallel tube production effort under the current program.

  19. Etching of Copper Coated Mylar Tubes With CF-4 Gas

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ecklund, Karl M.; Hartman, Keith W.; Hebert, Michael J.; Wojcicki, Stanley G.

    1996-04-01

    Using 5 mm diameter copper coated mylar straw tubes at a potential of 2.30 KV relative to a concentric 20 (mu)m diameter gold-plated tungsten anode, it has been observed that with very low flow rates of CF4-based gases the conductive copper cathode material may be removed entirely from the mylar surface.

  20. Rigid indented cylindrical cathode for x-ray tube

    DOE Patents [OSTI]

    Hudgens, C.R.

    1983-06-03

    A cathode assembly for a vacuum tube includes a wire filament, a straight tubular anode parallel to and surrounding the wire filament, insulating spacers for rigidly fastening the filament with respect to the anode, and with one side of the anode indented or flattened such that only one portion of the anode is heated to emitting temperatures by the filament.

  1. Method of coating graphite tubes with refractory metal carbides

    DOE Patents [OSTI]

    Wohlberg, C.

    1973-12-11

    A method of coating graphite tubes with a refractory metal carbide is described. An alkali halide is reacted with a metallic oxide, the metallic portion being selected from the IVth or Vth group of the Periodic Table, the resulting salt reacting in turn with the carbon to give the desired refractory metal carbide coating. (Official Gazette)

  2. Extrusion of metal oxide superconducting wire, tube or ribbon

    DOE Patents [OSTI]

    Dusek, Joseph T. (Lombard, IL)

    1993-01-01

    A process for extruding a superconducting metal oxide composition YBa.sub.2 Cu.sub.3 O.sub.7-x provides a wire (tube or ribbon) having a cohesive mass and a degree of flexibility together with enhanced electrical properties. Wire diameters in the range of 6-85 mils have been produced with smaller wires on the order of 10 mils in diameter exhibiting enhanced flexibility for forming braided, or multistrand, configurations for greater current carrying capacity. The composition for extrusion contains a polymeric binder to provide a cohesive mass to bind the particles together during the extrusion process with the binder subsequently removed at lower temperatures during sintering. The composition for extrusion further includes a deflocculent, an organic plasticizer and a solvent which also are subsequently removed during sintering. Electrically conductive tubing with an inner diameter of 52 mil and an outer diameter of 87-355 mil has also been produced. Flat ribbons have been produced in the range of 10-125 mil thick by 100-500 mil wide. The superconducting wire, tube or ribbon may include an outer ceramic insulating sheath co-extruded with the wire, tubing or ribbon.

  3. Extrusion of metal oxide superconducting wire, tube or ribbon

    DOE Patents [OSTI]

    Dusek, Joseph T.

    1993-10-05

    A process for extruding a superconducting metal oxide composition YBa.sub.2 Cu.sub.3 O.sub.7-x provides a wire (tube or ribbon) having a cohesive mass and a degree of flexibility together with enhanced electrical properties. Wire diameters in the range of 6-85 mils have been produced with smaller wires on the order of 10 mils in diameter exhibiting enhanced flexibility for forming braided, or multistrand, configurations for greater current carrying capacity. The composition for extrusion contains a polymeric binder to provide a cohesive mass to bind the particles together during the extrusion process with the binder subsequently removed at lower temperatures during sintering. The composition for extrusion further includes a deflocculent, an organic plasticizer and a solvent which also are subsequently removed during sintering. Electrically conductive tubing with an inner diameter of 52 mil and an outer diameter of 87-355 mil has also been produced. Flat ribbons have been produced in the range of 10-125 mil thick by 100-500 mil wide. The superconducting wire, tube or ribbon may include an outer ceramic insulating sheath co-extruded with the wire, tubing or ribbon.

  4. AXISYMMETRIC SCATTERING OF p MODES BY THIN MAGNETIC TUBES

    SciTech Connect (OSTI)

    Hindman, Bradley W.; Jain, Rekha

    2012-02-10

    We examine the scattering of acoustic p-mode waves from a thin magnetic fibril embedded in a gravitationally stratified atmosphere. The scattering is mediated through the excitation of slow sausage waves on the magnetic tube, and only the scattering of the monopole component of the wave field is considered. Since such tube waves are not confined by the acoustic cavity and may freely propagate along the field lines removing energy from the acoustic wave field, the excitation of fibril oscillations is a source of acoustic wave absorption as well as scattering. We compute the mode mixing that is achieved and the absorption coefficients and phase shifts. We find that for thin tubes the mode mixing is weak and the absorption coefficient is small and is a smooth function of frequency over the physically relevant band of observed frequencies. The prominent absorption resonances seen in previous studies of unstratified tubes are absent. Despite the relatively small absorption, the phase shift induced can be surprisingly large, reaching values as high as 15 Degree-Sign for f modes. Further, the phase shift can be positive or negative depending on the incident mode order and the frequency.

  5. Hand held sample tube manipulator, system and method

    DOE Patents [OSTI]

    Kenny, Donald V. [Liberty Township, OH; Smith, Deborah L. [Liberty Township, OH; Severance, Richard A. [late of Columbus, OH

    2001-01-01

    A manipulator apparatus, system and method for measuring analytes present in sample tubes. The manipulator apparatus includes a housing having a central bore with an inlet end and outlet end; a plunger mechanism with at least a portion thereof slideably disposed for reciprocal movement within the central bore, the plunger mechanism having a tubular gas channel with an inlet end and an outlet end, the gas channel inlet end disposed in the same direction as said inlet end of the central bore, wherein the inlet end of said plunger mechanism is adapted for movement so as to expel a sample tube inserted in the bore at the outlet end of the housing, the inlet end of the plunger mechanism is adapted for connection to gas supply; a first seal is disposed in the housing for sealing between the central bore and the plunger mechanism; a second seal is disposed at the outlet end of the housing for sealing between the central bore and a sample tube; a holder mounted on the housing for holding the sample tube; and a biasing mechanism for returning the plunger mechanism to a starting position.

  6. Rigid indented cylindrical cathode for X-ray tube

    DOE Patents [OSTI]

    Hudgens, Claude R. (Dayton, OH)

    1985-01-01

    A cathode assembly for a vacuum tube includes a wire filament, a straight bular anode parallel to and surrounding the wire filament, and insulating spacers for rigidly fastening the filament with respect to the anode, and with one side of the anode indented or flattened such that only one portion of the anode is heated to emitting temperatures by the filament.

  7. Acoustic recovery of lost power in pulse tube refrigerators

    SciTech Connect (OSTI)

    Swift, G.W.; Gardner, D.L.; Backhaus, S.

    1999-02-01

    In an efficient Stirling-cycle cryocooler, the cold piston or displacer recovers power from the gas. This power is dissipated into heat in the orifice of an orifice pulse tube refrigerator, decreasing system efficiency. Recovery of some of this power in a pulse tube refrigerator, without sacrificing the simplicity and reliability inherent in a system with no cold moving parts, is described in this paper. In one method of such power recovery, the hot ends of both the regenerator and the pulse tube are connected to the front of the piston driving the refrigerator. Experimental data is presented demonstrating this method using a thermoacoustic driver instead of a piston driver. Control of time-averaged mass flux through the refrigerator is crucial to this power recovery, lest the refrigerator{close_quote}s cooling power be overwhelmed by a room-temperature mass flux. Two methods are demonstrated for control of mass flux: a barrier method, and a hydrodynamic method based on turbulent irreversible flow. At {minus}55{degree}C, the refrigerator provided cooling with 9{percent} of the Carnot coefficient of performance. With straightforward improvements, similar refrigerators should achieve efficiencies greater than those of prior pulse tube refrigerators and prior standing-wave thermoacoustic refrigerators, while maintaining the advantages of no moving parts. {copyright} {ital 1999 Acoustical Society of America.}

  8. New guidelines should enhance coiled tubing well control security

    SciTech Connect (OSTI)

    Sas-Jaworsky, A. II

    1997-12-01

    The use of coiled tubing (CT) technology in well servicing operations has expanded dramatically in recent years, becoming a staple of remedial and workover programs. The advantages of CT services are numerous and well defined. As a result, the capabilities of this continuous-length tube technology have been exploited in applications such as high-pressure CT (HPCT), pushing the performance envelope into critical operations. In recent years, the mechanical capability and limitations of CT equipment components have become further defined, enhancing the safe working conditions of the prescribed operations. However, safety in coiled tubing operations is not only the product of equipment design, but of proper planning and identification of potential hazards. The following article highlights safety guidelines related to CT well control stack components as published in API RP 5C7, Recommended Practice for Coiled Tubing Operations in Oil and Gas Well Services (Dec. 1, 1996). API standards are published to facilitate the broad availability of proven engineering and operating practices, and are not intended to obviate the need for applying sound engineering judgment regarding when and where these standards should be utilized. Therefore, these standards should be considered the minimum safety requirements for well service operations, both onshore and offshore. These recommended practice guidelines have been prepared to reflect use by both operators and contract personnel.

  9. Proper bit selection improves ROP in coiled tubing drilling

    SciTech Connect (OSTI)

    King, W.W. )

    1994-04-18

    Using the correct type of bit can improve the rate of penetration (ROP) and therefore the economics of coiled tubing drilling operations. Key factors, based on studies of the coiled tubing jobs to date, are that the drilling system must be analyzed as a whole system and that both the drill bit type and the formation compressive strength are critical components in this analysis. Once a candidate job has been qualified technically for drilling with coiled tubing, the job will have to be justified economically compared to conventional drilling. A key part of the economic analysis is predicting the ROP in each formation to be drilled to establish a drilling time curve. This prediction should be based on the key components of the system, including the following: hydraulics, motor capabilities, weight on bit (WOB), rock compressive strength, and bit type. This analysis should not base expected ROPs and offset wells drilled with conventional rigs and equipment. Furthermore, a small-diameter bit should not be selected simply by using the International Association of Drilling Contractor (IADC) codes of large-diameter bits used in offset wells. Coiled tubing drilling is described, then key factors in the selection are discussed.

  10. Horizontal underbalanced drilling of gas wells with coiled tubing

    SciTech Connect (OSTI)

    Cox, R.J.; Li, J.; Lupick, G.S.

    1999-03-01

    Coiled tubing drilling technology is gaining popularity and momentum as a significant and reliable method of drilling horizontal underbalanced wells. It is quickly moving into new frontiers. To this point, most efforts in the Western Canadian Basin have been focused towards sweet oil reservoirs in the 900--1300 m true vertical depth (TVD) range, however there is an ever-increasing interest in deeper and gas-producing formations. Significant design challenges on both conventional and coiled tubing drilling operations are imposed when attempting to drill these formations underbalanced. Coiled tubing is an ideal technology for underbalanced drilling due to its absence of drillstring connections resulting in continuous underbalanced capabilities. This also makes it suitable for sour well drilling and live well intervention without the risk of surface releases of reservoir gas. Through the use of pressure deployment procedures it is possible to complete the drilling operation without need to kill the well, thereby maintaining underbalanced conditions right through to the production phase. The use of coiled tubing also provides a means for continuous wireline communication with downhole steering, logging and pressure recording devices.

  11. Inertial fusion energy target injection, tracking, and beam pointing

    SciTech Connect (OSTI)

    Petzoldt, R.W.

    1995-03-07

    Several cryogenic targets must be injected each second into a reaction chamber. Required target speed is about 100 m/s. Required accuracy of the driver beams on target is a few hundred micrometers. Fuel strength is calculated to allow acceleration in excess of 10,000 m/s{sup 2} if the fuel temperature is less than 17 K. A 0.1 {mu}m thick dual membrane will allow nearly 2,000 m/s{sup 2} acceleration. Acceleration is gradually increased and decreased over a few membrane oscillation periods (a few ms), to avoid added stress from vibrations which could otherwise cause a factor of two decrease in allowed acceleration. Movable shielding allows multiple targets to be in flight toward the reaction chamber at once while minimizing neutron heating of subsequent targets. The use of multiple injectors is recommended for redundancy which increases availability and allows a higher pulse rate. Gas gun, rail gun, induction accelerator, and electrostatic accelerator target injection devices are studied, and compared. A gas gun is the preferred device for indirect-drive targets due to its simplicity and proven reliability. With the gas gun, the amount of gas required for each target (about 10 to 100 mg) is acceptable. A revolver loading mechanism is recommended with a cam operated poppet valve to control the gas flow. Cutting vents near the muzzle of the gas gun barrel is recommended to improve accuracy and aid gas pumping. If a railgun is used, we recommend an externally applied magnetic field to reduce required current by an order of magnitude. Optical target tracking is recommended. Up/down counters are suggested to predict target arrival time. Target steering is shown to be feasible and would avoid the need to actively point the beams. Calculations show that induced tumble from electrostatically steering the target is not excessive.

  12. Solvent recovery targeting

    SciTech Connect (OSTI)

    Ahmad, B.S.; Barton, P.I.

    1999-02-01

    One of the environmental challenges faced by the pharmaceutical and specialty chemical industries is the widespread use of organic solvents. With a solvent-based chemistry, the solvent necessarily has to be separated from the product. Chemical species in waste-solvent streams typically form multicomponent azeotropic mixtures, and this often complicates separation and, hence, recovery of solvents. A design approach is presented whereby process modifications proposed by the engineer to reduce the formation of waste-solvent streams can be evaluated systematically. This approach, called solvent recovery targeting, exploits a recently developed algorithm for elucidating the separation alternatives achievable when applying batch distillation to homogeneous multicomponent mixtures. The approach places the composition of the waste-solvent mixture correctly in the relevant residue curve map and computes the maximum amount of pure material that can be recovered via batch distillation. Solvent recovery targeting is applied to two case studies derived from real industrial processes.

  13. Ultrasonic Concentration in a Line-Driven Cylindrical Tube

    SciTech Connect (OSTI)

    G.R. Goddard

    2004-12-15

    The fractionation of particles from their suspending fluid or noninvasive micromanipulation of particles in suspension has many applications ranging from the recovery of valuable reagents from process flows to the fabrication of microelectromechanical devices. Techniques based on size, density, solubility, or electromagnetic properties exist for fulfilling these needs, but many particles have traits that preclude their use such as small size, neutral buoyancy, or uniform electromagnetic characteristics. While separation by those techniques may not be possible, often compressibility differences exist between the particle and fluid that would allow fractionation by acoustic forces. The potential of acoustic separation is known, but due to inherent difficulties in achieving and maintaining accurate alignment of the transduction system, it is rarely utilized. The objective of this project is to investigate the use of structural excitation as a potentially efficient concentration/fractionation method for particles in suspension. It is demonstrated that structural excitation of a cylindrically symmetric cavity, such as a tube, allows non-invasive, fast, and low power concentration of particles suspended in a fluid. The inherent symmetry of the system eliminates the need for careful alignment inherent in current acoustic concentration devices. Structural excitation distributes the acoustic field throughout the volume of the cavity, which also significantly reduces temperature gradients and acoustic streaming in the fluid; cavitation is no longer an issue. The lowest-order coupled modes of a long cylindrical glass tube and fluid-filled cavity, driven by a line contact, are tuned, via material properties and aspect ratio, to achieve a coupled dipolar vibration of the system, shown to generate efficient concentration of particles to the central axis of the tube. A two dimensional elastodynamic model of the system was developed and subsequently utilized to optimize particle concentration within the system. The effects of tubing, fluid, and particle material properties, tube geometry, fluid flow, and tube length on the structural excitation and consequently power requirements and concentration quality within the tube were investigated theoretically and experimentally. Limitations of the method are discussed, as well as ways to minimize or compensate for deleterious effects. Finally a preliminary demonstration of the efficacy of acoustic concentration is presented.

  14. Tungsten-rhenium composite tube fabricated by CVD for application in 1800/sup 0/C high thermal efficiency fuel processing furnace

    SciTech Connect (OSTI)

    Svedberg, R.C.; Bowen, W.W.; Buckman, R.W. Jr.

    1980-04-01

    Chemical Vapor Deposit (CVD) rhenium was selected as the muffle material for an 1800/sup 0/C high thermal efficiency fuel processing furnace. The muffle is exposed to high vacuum on the heater/insulation/instrumentation side and to a flowing argon-8 V/0 hydrogen gas mixture at one atmosphere pressure on the load volume side. During operation, the muffle cycles from room temperature to 1800/sup 0/C and back to room temperature once every 24 hours. Operational life is dependent on resistance to thermal fatigue during the high temperature exposure. For a prototypical furnace, the muffle is approximately 13 cm I.D. and 40 cm in length. A small (about one-half size) rhenium closed end tube overcoated with tungsten was used to evaluate the concept. The fabrication and testing of the composite tungsten-rhenium tube and prototypic rhenium muffle is described.

  15. Apparatus for forming targets

    DOE Patents [OSTI]

    Woerner, Robert L.

    1980-01-01

    Apparatus and method for cryoinduced uniform deposition of cryogenic materials, such as deuterium-tritium (DT) mixtures, on the inner surface of hollow spherical members, such as inertially imploded targets. By vaporizing and quickly refreezing cryogenic materials contained within a hollow spherical member, a uniform layer of the materials is formed on the inner surface of the spherical member. Heating of the cryogenic material, located within a non-isothermal compact freezing cell, is accomplished by an electrical heat pulse, whereafter the material is quickly frozen forming a uniform layer on the inner surface of the spherical member. The method is not restricted to producing a frozen layer on only the inner surface of the innermost hollow member, but where multiple concentric hollow spheres are involved, such as in multiple shell targets for lasers, electron beams, etc., layers of cryogenic material may also be formed on the inner surface of intermediate or outer spherical members, thus providing the capability of forming targets having multiple concentric layers or shells of frozen DT.

  16. Method for forming targets

    DOE Patents [OSTI]

    Woerner, Robert L.

    1979-01-01

    Method for cryoinduced uniform deposition of cryogenic materials, such as deuterium-tritium (DT) mixtures, on the inner surface of hollow spherical members, such as inertially imploded targets. By vaporizing and quickly refreezing cryogenic materials contained within a hollow spherical member, a uniform layer of the materials is formed on the inner surface of the spherical member. Heating of the cryogenic material, located within a non-isothermal compact freezing cell, is accomplished by an electrical heat pulse, whereafter the material is quickly frozen forming a uniform layer on the inner surface of the spherical member. The method is not restricted to producing a frozen layer on only the inner surface of the innermost hollow member, but where multiple concentric hollow spheres are involved, such as in multiple shell targets for lasers, electron beams, etc., layers of cryogenic material may also be formed on the inner surface of intermediate or outer spherical members, thus providing the capability of forming targets having multiple concentric layers or shells of frozen DT.

  17. Variability of Load and Net Load in Case of Large Scale Distributed Wind Power

    SciTech Connect (OSTI)

    Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Gomez-Lazaro, E.; Rawn, B.; Dobschinski, J.; Meibom, P.; Lannoye, E.; Aigner, T.; Wan, Y. H.; Milligan, M.

    2011-01-01

    Large scale wind power production and its variability is one of the major inputs to wind integration studies. This paper analyses measured data from large scale wind power production. Comparisons of variability are made across several variables: time scale (10-60 minute ramp rates), number of wind farms, and simulated vs. modeled data. Ramp rates for Wind power production, Load (total system load) and Net load (load minus wind power production) demonstrate how wind power increases the net load variability. Wind power will also change the timing of daily ramps.

  18. Synthesis of polyoxometalate-loaded epoxy composites

    DOE Patents [OSTI]

    Anderson, Benjamin J

    2014-10-07

    The synthesis of a polyoxometalate-loaded epoxy uses a one-step cure by applying an external stimulus to release the acid from the polyoxometalate and thereby catalyze the cure reaction of the epoxy resin. Such polyoxometalate-loaded epoxy composites afford the cured epoxy unique properties imparted by the intrinsic properties of the polyoxometalate. For example, polyoxometalate-loaded epoxy composites can be used as corrosion resistant epoxy coatings, for encapsulation of electronics with improved dielectric properties, and for structural applications with improved mechanical properties.

  19. DOE - Office of Legacy Management -- U S Steel Co National Tube...

    Office of Legacy Management (LM)

    Steel Co National Tube Div Christy Park Works - PA 35 FUSRAP Considered Sites Site: U. S. STEEL CO., NATIONAL TUBE DIV., CHRISTY PARK WORKS (PA.35) Eliminated from further...

  20. JLab's YouTube Channel Attracts 100,000 Subscribers | Jefferson...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    JLab's YouTube Channel Attracts 100,000 Subscribers In roughly six years, Jefferson Lab's ... Over the years, most of Jefferson Lab's YouTube subscribers have tuned in for the ...

  1. The Effect of Element Formulation on the Prediction of Boost Effects in Numerical Tube Bending

    SciTech Connect (OSTI)

    Bardelcik, A.; Worswick, M.J.

    2005-08-05

    This paper presents advanced FE models of the pre-bending process to investigate the effect of element formulation on the prediction of boost effects in tube bending. Tube bending experiments are conducted with 3'' (OD) IF (Interstitial-Free) steel tube on a fully instrumented Eagle EPT-75 servo-hydraulic mandrel-rotary draw tube bender. Experiments were performed in which the bending boost was varied at three levels and resulted in consistent trends in the strain and thickness distribution within the pre-bent tubes. A numerical model of the rotary draw tube bender was used to simulate pre-bending of the IF tube with the three levels of boost from the experiments. To examine the effect of element formulation on the prediction of boost, the tube was modeled with shell and solid elements. Both models predicted the overall strain and thickness results well, but showed different trends in each of the models.

  2. An overview of the nondestructive inspection techniques for coiled tubing and pipe

    SciTech Connect (OSTI)

    Stanley, R.K.

    1996-11-01

    Coiled steel tubing and pipe in the diameter range 20--90 mm (0.75--3.5 in.) are replacing conventional oilfield materials for a variety of purposes including workovers, drilling, production tubing, umbilicals, and flowlines. They offer all the advantages of long tubes with no threaded connections. Because coiled tubing is being produced to high quality standards, it is lasting longer than ever before, and the need has arisen for careful nondestructive inspection at frequent intervals to determine accumulated damage to the string and the need for repair. Currently, derating of used coiled tubing using nondestructive testing (NDT) is not performed. While NDT devices for oilfield tubulars have been well documented, little has been written regarding the NDT of coiled tubing. This paper outlines the current NDT methods used during the manufacture of new tubing and the inspection of used coiled tubing.

  3. Through tubing window milling -- A cost effective method of casing exit

    SciTech Connect (OSTI)

    Blizzard, B.; Carter, T.; Roberts, J.

    1996-12-31

    Through tubing operations currently provide oilfield operators with an attractive method for significantly enhancing production at a relatively low cost. This paper will present a newly developed and innovative system for initiating a production casing sidetrack below the production tubing. The system uses coiled tubing technology and blends the special techniques of both drilling and window milling operations using coiled tubing. Development details emphasized will be the overall system design, performance criteria and equipment evaluation.

  4. Minimizing the life cycle costs attributed to boiler tubing in fossil-fueled plants

    SciTech Connect (OSTI)

    Paterson, S.R.

    1995-08-01

    During the past quarter century, much has been learned about tube degradation, the factors which lead to and influence the rate of damage, and measures to mitigate or eliminate the damage in boiler tubing. This paper will describe some of the knowledge which has been compiled regarding two of the most significant degradation modes--corrosion-fatigue of waterwall tubes and high temperature creep of superheater and reheater tubes.

  5. Radiation load to the SNAP CCD

    SciTech Connect (OSTI)

    N. V. Mokhov, I. L. Rakhno and S. I. Striganov

    2003-08-14

    Results of an express Monte Carlo analysis with the MARS14 code of radiation load to the CCD optical detectors in the Supernova Acceleration Project (SNAP) mission presented for realistic radiation environment over the satellite orbit.

  6. High density load bearing insulation peg

    DOE Patents [OSTI]

    Nowobilski, Jeffert J.; Owens, William J.

    1985-01-01

    A high density peg which can support a large load and exhibits excellent thermal resistance produced by a method wherein the peg is made in compliance with specified conditions of time, temperature and pressure.

  7. High density load bearing insulation peg

    DOE Patents [OSTI]

    Nowobilski, J.J.; Owens, W.J.

    1985-01-29

    A high density peg is disclosed which can support a large load and exhibits excellent thermal resistance produced by a method wherein the peg is made in compliance with specified conditions of time, temperature and pressure. 4 figs.

  8. Radiopure Metal-Loaded Liquid Scintillator

    SciTech Connect (OSTI)

    Rosero, Richard; Yeh, Minfang

    2015-03-18

    Metal-loaded liquid scintillator plays a key role in particle and nuclear physics experiments. The applications of metal ions in various neutrino experiments and the purification methods for different scintillator components are discussed in this paper.

  9. Passive load control for large wind turbines.

    SciTech Connect (OSTI)

    Ashwill, Thomas D.

    2010-05-01

    Wind energy research activities at Sandia National Laboratories focus on developing large rotors that are lighter and more cost-effective than those designed with current technologies. Because gravity scales as the cube of the blade length, gravity loads become a constraining design factor for very large blades. Efforts to passively reduce turbulent loading has shown significant potential to reduce blade weight and capture more energy. Research in passive load reduction for wind turbines began at Sandia in the late 1990's and has moved from analytical studies to blade applications. This paper discusses the test results of two Sandia prototype research blades that incorporate load reduction techniques. The TX-100 is a 9-m long blade that induces bend-twist coupling with the use of off-axis carbon in the skin. The STAR blade is a 27-m long blade that induces bend-twist coupling by sweeping the blade in a geometric fashion.

  10. Customer Load Eligibility Guidelines (CLEG), April 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3.2. Mixed Residential and Commercial Uses (50% Rule). Load related to commercial enterprises metered through a bona fide residence is eligible for REP benefits as long as the...

  11. 1999 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1999-12-01

    The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to its regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. The White Book will not be used in calculations for the 2002 regional power sales contract subscription process. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions, including expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. In this loads and resources study, resource availability is compared with a medium forecast of electricity consumption. The forecasted future electricity demands--firm loads--are subtracted from the projected capability of existing and ''contracted for'' resources to determine whether BPA and the region will be surplus or deficit. If Federal system resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA may use or market to increase revenues. Conversely, if Federal system firm loads exceed available resources, there is a deficit of energy and/or capacity and BPA would add conservation or contract purchases as needed to meet its firm loads. The load forecast is derived by using econometric models and analysis to predict the loads that will be placed on electric utilities in the region. This study incorporates information on contract obligations and contract resources, combined with the resource capabilities obtained from public utility and investor-owned utility (IOU) customers through their annual data submittals to the PNUCC, from BPA's Firm Resource Exhibit (FRE Exhibit I) submittals, and through analysis of the Federal hydroelectric power system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. The PNCA defines the planning and operation of the regional hydrosystem. The 1999 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix (available electronically only) detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the December 1998 Pacific Northwest Loads and Resources Study. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 2000-01 through 2009-10. The study shows the Federal system's and the region's monthly estimated maximum electricity demand, monthly energy demand, monthly energy generation, and monthly maximum generating capability--capacity--for OY 2000-01, 2004-05, and 2009-10. The Federal system and regional monthly capacity surplus/deficit projections are summarized for 10 operating years. This document analyzes the Pacific Northwest's projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resources in addition to the Federal system.

  12. Economic impacts of irrigation load management controls

    SciTech Connect (OSTI)

    Taylor, D.C. )

    1988-01-01

    Irrigators subject to load management controls experience electric power interruptions during periods of peak power demand. The resulting interruptions in irrigation pumping may result in moisture stress-induced crop yield reductions. The results of analysis show a great sensitivity of irrigator incomes to such yield losses. The sensitivity is of such a magnitude that rural electric cooperatives (RECs) would have to offer load management incentives of at least five times their monthly demand charges for irrigators under typical conditions (not oversized irrigation pumps) to remain under load control when irrigated crops are experiencing yield-reducing moisture stress. Incentives of this magnitude cannot be economically justified by most RECs. Thus, provision for the voluntary withdrawal of irrigators from load control is an essential feature of most workable and effective irrigation laod management programs.

  13. Adjustable Speed Drive Part-Load Efficiency

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Variable Torque Loads Pulse-width-modulated (PWM) VFDs are most often used in variable ... When considering PWM VFDs, you may use manufacturer's data or Table 1 to obtain effciency ...

  14. Web Login Service - Loading Session State...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Login Service - Loading Session State... Since your browser does not support JavaScript, you must press the Continue button once to proceed. Continue Insert your footer text here....

  15. S-Band Loads for SLAC Linac

    SciTech Connect (OSTI)

    Krasnykh, A.; Decker, F.-J.; LeClair, R.; /INTA Technologies, Santa Clara

    2012-08-28

    The S-Band loads on the current SLAC linac RF system were designed, in some cases, 40+ years ago to terminate 2-3 MW peak power into a thin layer of coated Kanthal material as the high power absorber [1]. The technology of the load design was based on a flame-sprayed Kanthal wire method onto a base material. During SLAC linac upgrades, the 24 MW peak klystrons were replaced by 5045 klystrons with 65+ MW peak output power. Additionally, SLED cavities were introduced and as a result, the peak power in the current RF setup has increased up to 240 MW peak. The problem of reliable RF peak power termination and RF load lifetime required a careful study and adequate solution. Results of our studies and three designs of S-Band RF load for the present SLAC RF linac system is discussed. These designs are based on the use of low conductivity materials.

  16. Final Project Report Load Modeling Transmission Research

    SciTech Connect (OSTI)

    Lesieutre, Bernard; Bravo, Richard; Yinger, Robert; Chassin, Dave; Huang, Henry; Lu, Ning; Hiskens, Ian; Venkataramanan, Giri

    2012-03-31

    The research presented in this report primarily focuses on improving power system load models to better represent their impact on system behavior. The previous standard load model fails to capture the delayed voltage recovery events that are observed in the Southwest and elsewhere. These events are attributed to stalled air conditioner units after a fault. To gain a better understanding of their role in these events and to guide modeling efforts, typical air conditioner units were testing in laboratories. Using data obtained from these extensive tests, new load models were developed to match air conditioner behavior. An air conditioner model is incorporated in the new WECC composite load model. These models are used in dynamic studies of the West and can impact power transfer limits for California. Unit-level and systemlevel solutions are proposed as potential solutions to the delayed voltage recovery problem.

  17. Load apparatus and method for bolt-loaded compact tension test specimen

    DOE Patents [OSTI]

    Buescher, B.J. Jr.; Lloyd, W.R.; Ward, M.B.; Epstein, J.S.

    1997-02-04

    A bolt-loaded compact tension test specimen load apparatus includes: (a) a body having first and second opposing longitudinal ends, the first end comprising an externally threaded portion sized to be threadedly received within the test specimen threaded opening; (b) a longitudinal loading rod having first and second opposing longitudinal ends, the loading rod being slidably received in a longitudinal direction within the body internally through the externally threaded portion and slidably extending longitudinally outward of the body first longitudinal end; (c) a force sensitive transducer slidably received within the body and positioned to engage relative to the loading rod second longitudinal end; and (d) a loading bolt threadedly received relative to the body, the loading bolt having a bearing end surface and being positioned to bear against the transducer to forcibly sandwich the transducer between the loading bolt and loading rod. Also disclosed is a method of in situ determining applied force during crack propagation in a bolt-loaded compact tension test specimen. 6 figs.

  18. Load apparatus and method for bolt-loaded compact tension test specimen

    DOE Patents [OSTI]

    Buescher, Jr., Brent J.; Lloyd, W. Randolph; Ward, Michael B.; Epstein, Jonathan S.

    1997-01-01

    A bolt-loaded compact tension test specimen load apparatus includes: a) a body having first and second opposing longitudinal ends, the first end comprising an externally threaded portion sized to be threadedly received within the test specimen threaded opening; b) a longitudinal loading rod having first and second opposing longitudinal ends, the loading rod being slidably received in a longitudinal direction within the body internally through the externally threaded portion and slidably extending longitudinally outward of the body first longitudinal end; c) a force sensitive transducer slidably received within the body and positioned to engage relative to the loading rod second longitudinal end; and d) a loading bolt threadedly received relative to the body, the loading bolt having a bearing end surface and being positioned to bear against the transducer to forcibly sandwich the transducer between the loading bolt and loading rod. Also disclosed is a method of in situ determining applied force during crack propagation in a bolt-loaded compact tension test specimen.

  19. Gearbox Reliability Collaborative (GRC) Description and Loading

    SciTech Connect (OSTI)

    Oyague, F.

    2011-11-01

    This document describes simulated turbine load cases in accordance to the IEC 61400-1 Ed.3 standard, which is representative of the typical wind turbine design process. The information presented herein is intended to provide a broad understanding of the gearbox reliability collaborative 750kW drivetrain and turbine configuration. In addition, fatigue and ultimate strength drivetrain loads resulting from simulations are presented. This information provides the bases for the analytical work of the gearbox reliability collaborative effort.

  20. Laser Driven Dynamic Loading of Condensed Matter

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laser Driven Dynamic Loading of Condensed Matter Laser Driven Dynamic Loading of Condensed Matter Advanced diagnostics of experiments covering many orders of magnitude in strain rate Contact Eric Loomis (505) 665-3196 Email Dynamic materials experiments over a wide range of strain rates are essential to studying constitutive relations (e.g., plasticity), damage (e.g., spall), equations of state, phase transitions and kinetics, and novel materials. The Trident laser facility supplies unique,

  1. A dynamic model for underbalanced drilling with coiled tubing

    SciTech Connect (OSTI)

    Rommetveit, R.; Vefring, E.H.; Wang, Z.; Bieseman, T.; Faure, A.M.

    1995-11-01

    A model for underbalanced drilling with coiled tubing has been developed which takes into account all important factors contributing to the process. This model is a unique tool to plan and execute underbalanced or near balance drilling operations. It is a transient, one-dimensional multi-phase flow model with the following components: Lift gas system model, multiphase hydraulics model, reservoir-wellbore interaction model, drilling model, models for multiphase fluids (lift gas, produced gas, mud, foam, produced gas, oil, water and cuttings). Various alternative geometries for gas injection are modeled as well as all important operations during underbalanced drilling with coiled tubing. The model as well as some simulation results for its use are presented in this paper.

  2. The challenge of performing safer coiled tubing operations

    SciTech Connect (OSTI)

    Van Adrichem, W.P.; Dowell, S.; Godsman, J.M.

    1996-12-31

    The substantial growth in coiled tubing services over the past several years has increased both the frequency of lost time injuries and potential for job execution related incidents. As the industry realizes the additional benefits of coiled tubing e.g. well intervention under pressure, efficiency, selective placement of fluids down hole and drilling, it is obvious that pipe size has, and will continue to increase. Pipe size has increased from a modest 1 {1/4} inches outside diameter ten years ago to outside diameters in excess of 2 7/8 inch being used on a regular basis today. In addition the development of programs to predict pipe fatigue and down hole stresses have encouraged operators to become more confident with the service.

  3. Novel coiled tubing application controls large LPG storage well fire

    SciTech Connect (OSTI)

    Gebhardt, F.; Eby, D.; Barnett, D.

    1996-06-01

    Conventional well control techniques for normal oil and gas wells are widely known and have been presented on numerous occasions. However, LPG storage (or cavern) wells rarely blow out and/or catch on fire. As a result, little information has been presented on the topic of well control for these types of wells. This article chronicles a case history of a high-volume liquid propane storage well fire. Because conventional wellhead removal methods could not be applied in this case, the capping/kill plan called for use of coiled tubing in a novel manner to cut the tubing downhole and install an inflatable packer to shut off propane flow. The plan was successfully executed, saving the operator millions of dollars in LPC product loss and cost of control.

  4. Target: Subpoena (2010-SE-2001)

    Broader source: Energy.gov [DOE]

    DOE issued a Subpoena for Information and Production of Documents to Target Corporation requesting information regarding the compliance of various torchieres Target has distributed in commerce in the U.S.

  5. Rotor for processing liquids using movable capillary tubes

    DOE Patents [OSTI]

    Johnson, Wayne F.; Burtis, Carl A.; Walker, William A.

    1989-05-30

    A rotor assembly for processing liquids, especially whole blood samples, is disclosed. The assembly includes apparatus for separating non-liquid components of whole blood samples from liquid components, apparatus for diluting the separated liquid component with a diluent and apparatus for transferring the diluted sample to an external apparatus for analysis. The rotor assembly employs several movable capillary tubes to handle the sample and diluents. A method for using the rotor assembly to process liquids is also described.

  6. Acetone sensor based on zinc oxide hexagonal tubes

    SciTech Connect (OSTI)

    Hastir, Anita Singh, Onkar Anand, Kanika Singh, Ravi Chand

    2014-04-24

    In this work hexagonal tubes of zinc oxide have been synthesized by co-precipitation method. For structural, morphological, elemental and optical analysis synthesized powders were characterized by using x-ray diffraction, field emission scanning microscope, EDX, UV-visible and FTIR techniques. For acetone sensing thick films of zinc oxide have been deposited on alumina substrate. The fabricated sensors exhibited maximum sensing response towards acetone vapour at an optimum operating temperature of 400°C.

  7. Rotor for processing liquids using movable capillary tubes

    DOE Patents [OSTI]

    Johnson, Wayne F.; Burtis, Carl A.; Walker, William A.

    1989-01-01

    A rotor assembly for processing liquids, especially whole blood samples, is disclosed. The assembly includes apparatus for separating non-liquid components of whole blood samples from liquid components, apparatus for diluting the separated liquid component with a diluent and apparatus for transferring the diluted sample to an external apparatus for analysis. The rotor assembly employs several movable capillary tubes to handle the sample and diluents. A method for using the rotor assembly to process liquids is also described.

  8. Rotor for processing liquids using movable capillary tubes

    DOE Patents [OSTI]

    Johnson, W.F.; Burtis, C.A.; Walker, W.A.

    1987-07-17

    A rotor assembly for processing liquids, especially whole blood samples, is disclosed. The assembly includes apparatus for separating non-liquid components of whole blood samples from liquid components, apparatus for diluting the separated liquid component with a diluent and apparatus for transferring the diluted sample to an external apparatus for analysis. The rotor assembly employs several movable capillary tubes to handle the sample and diluents. A method for using the rotor assembly to process liquids is also described. 5 figs.

  9. Low Power Photomultiplier Tube Circuit And Method Thereor

    DOE Patents [OSTI]

    Bochenski, Edwin B.; Skinner, Jack L.; Dentinger, Paul M.; Lindblom, Scott C.

    2006-04-18

    An electrical circuit for a photomultiplier tube (PMT) is disclosed that reduces power consumption to a point where the PMT may be powered for extended periods with a battery. More specifically, the invention concerns a PMT circuit comprising a low leakage switch and a high voltage capacitor positioned between a resistive divider and each of the PMT dynodes, and a low power control scheme for recharging the capacitors.

  10. Development of a coiled tubing cable installation system

    SciTech Connect (OSTI)

    Newman, K.R.; Haver, N.A.; Stone, L.R.

    1995-12-31

    A system has been developed which installs and de-installs an electric wireline cable in coiled tubing (CT) while the CT is still on the reel. This cable installation system reduces the cost of a cable installation significantly compared with previous installation methods. This paper discusses the need for such a system, the theory used to develop this system, the various concepts considered, the system that was developed and test installation cases.

  11. Erosion-corrosion behavior of PFBC in-bed tubes

    SciTech Connect (OSTI)

    Tsumita, Yoshi; Namba, Kazuo; Kajigaya, Ichiro; Sonoya, Keiji

    1997-12-31

    In the design and operation of Pressurized Fluidized-Bed Combustion (PFBC) plant, it is important to investigate erosion-corrosion behavior of in-bed heat exchanger tubes, since such phenomena is complicated by interaction of erosion and corrosion due to high operating temperature. Investigations to clarify the erosion-corrosion mechanism of materials were performed by using laboratory test facility and PFBC pilot plant (3MW), to determine the specifications of in-bed tubes and assess their life for the first commercial PFBC plant having a capacity of 360MW. In the laboratory test, erosion-corrosion behavior of wide variety of coated materials, which include thermally sprayed coatings, diffusion coatings and hard metal claddings, and non-coated steel candidates for the typical boiler tubes were evaluated by using fluidized-bed type erosion test rig. The erosion tests were carried out in order to obtain the tanking of candidate materials. And test coupons of candidate materials were also inserted into IHI`s PFBC pilot plant in order to predict the material wastage of actual boiler environment. The following guidelines for selecting the appropriate materials and assessing the life of in-bed tubes were given by these test results. (1) At lower temperature, applying thermal spray coatings is the best solution to protect erosion damage. (2) At higher temperature, materials show enough erosion-corrosion resistance because of the formation of hard oxide scale on the surface. These results have been verified by long-term operational experience of the 71MW Wakamatsu PFBC, which is the first demonstration plant in Japan.

  12. Heat transfer coefficients and pressure drops for R-134a and an ester lubricant mixture in a smooth tube and a micro-fin tube

    SciTech Connect (OSTI)

    Eckels, S.J.; Doerr, T.M.; Pate, M.B.

    1998-10-01

    This paper reports average heat transfer coefficients and pressure drops during the evaporation and condensation of mixtures of R-134a and a 150 SUS penta erythritol ester branched-acid lubricant. The smooth tube and micro-fin tube tested in this study had outer diameters of 9.52 mm (3/8 in.). The micro-fin tube had 60 fins, a fin height of 0.2 mm (0.008 in), and a spiral angle of 18{degree}. The objective of this study is to evaluate the effectiveness of the micro-fin tube with R-134a and to determine the effect of circulating lubricant. The experimental results show that the micro-fin tube has distinct performance advantages over the smooth tube. For example, the average heat transfer coefficients during evaporation and condensation in the micro-fin tube were 50--200% higher than those for the smooth tube, while the average pressure drops were on average only 10--50% higher. The experimental results indicate that the presence of a lubricant degrades the average heat transfer coefficients during both evaporation and condensation at high lubricant concentrations. Pressure drops during evaporation increased with the addition of a lubricant in both tubes. For condensation, pressure drops were unaffected by the addition of a lubricant.

  13. Modelling Sawing of Metal Tubes Through FEM Simulation

    SciTech Connect (OSTI)

    Bort, C. M. Giorgio; Bosetti, P.; Bruschi, S.

    2011-05-04

    The paper presents the development of a numerical model of the sawing process of AISI 304 thin tubes, which is cut through a circular blade with alternating roughing and finishing teeth. The numerical simulation environment is the three-dimensional FEM software Deform v.10.1. The teeth actual trajectories were determined by a blade kinematics analysis developed in Matlab. Due to the manufacturing rolling steps and subsequent welding stage, the tube material is characterized by a gradient of properties along its thickness. Consequently, a simplified cutting test was set up and carried out in order to identify the values of relevant material parameters to be used in the numerical model. The dedicated test was the Orthogonal Tube Cutting test (OTC), which was performed on an instrumented lathe. The proposed numerical model was validated by comparing numerical results and experimental data obtained from sawing tests carried out on an industrial machine. The following outputs were compared: the cutting force, the chip thickness, and the chip contact area.

  14. Ex-ante modeling, Load Scheduling and Differentiated Service...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... In English: Load load shape shifted at time of change of state (off to on) 18 42 ... In English: Load (power) rate of change in state of charge x i (t) (energy) The ...

  15. Electromagnetic targeting of guns

    SciTech Connect (OSTI)

    Pogue, E.W.; Boat, R.M.; Holden, D.N.; Lopez, J.R.

    1996-10-01

    This is the final report of a one-year, Laboratory-Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). Electromagnetic pulse (EMP) signals produced from explosives being fired have been reported in the literature for fifty years. When a gun is fired it produces an EMP muzzle blast signal. The strength and nature of these signals was first analyzed in the early 1970s, while the results were interesting, no follow-up studies were conducted. With modern detection and signal processing technology, we believe that these signals could be used to instantaneously locate guns of virtually all calibers as they fire. The objective of our one-year project was to establish the basic nature of these signals and their utility in the concept of electromagnetic targeting of guns.

  16. Target detection portal

    DOE Patents [OSTI]

    Linker, Kevin L. (Albuquerque, NM); Brusseau, Charles A. (Tijeras, NM)

    2002-01-01

    A portal apparatus for screening persons or objects for the presence of trace amounts of target substances such as explosives, narcotics, radioactive materials, and certain chemical materials. The portal apparatus can have a one-sided exhaust for an exhaust stream, an interior wall configuration with a concave-shape across a horizontal cross-section for each of two facing sides to result in improved airflow and reduced washout relative to a configuration with substantially flat parallel sides; air curtains to reduce washout; ionizing sprays to collect particles bound by static forces, as well as gas jet nozzles to dislodge particles bound by adhesion to the screened person or object. The portal apparatus can be included in a detection system with a preconcentrator and a detector.

  17. 2006 Pacific Northwest Loads and Resources Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2006-03-01

    The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues, although the database that generates the data for the White Book analysis contributes to the development of BPA's inventory and ratemaking processes. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions that include expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. The load resource balance of both the Federal system and the region is determined by comparing resource availability to an expected level of total retail electricity consumption. Resources include projected energy capability plus contract purchases. Loads include a forecast of retail obligations plus contract obligations. Surplus energy is available when resources are greater than loads. This surplus energy could be marketed to increase revenues. Energy deficits occur when resources are less than loads. These energy deficits will be met by any combination of the following: better-than-critical water conditions, demand-side management and conservation programs, permanent loss of loads due to economic conditions or closures, additional contract purchases, and/or the addition of new generating resources. This study incorporates information on Pacific Northwest (PNW) regional retail loads, contract obligations, and contract resources. This loads and resources analysis simulates the operation of the power system in the PNW. The simulated hydro operation incorporates plant characteristics, streamflows, and non-power requirements from the current Pacific Northwest Coordination Agreement (PNCA). Additional resource capability estimates were provided by BPA, PNW Federal agency, public agency, cooperative, U.S. Bureau of Reclamation (USBR), and investor-owned utility (IOU) customers furnished through annual PNUCC data submittals for 2005 and/or direct submittals to BPA. The 2006 White Book is presented in two documents: (1) this summary document of Federal system and PNW region loads and resources, and (2) a technical appendix which presents regional loads, grouped by major PNW utility categories, and detailed contract and resource information. The technical appendix is available only in electronic form. Individual customer information for marketer contracts is not detailed due to confidentiality agreements. The 2006 White Book analysis updates the 2004 White Book. This analysis shows projections of the Federal system and region's yearly average annual energy consumption and resource availability for the study period, OY 2007-2016. The study also presents projections of Federal system and region expected 1-hour monthly peak demand, monthly energy demand, monthly 1-hour peak generating capability, and monthly energy generation for OY 2007, 2011, and 2016. BPA is investigating a new approach in capacity planning depicting the monthly Federal system 120-hour peak generating capability and 120-hour peak surplus/deficit for OY 2007, 2011, and 2016. This document analyzes the PNW's projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger PNW regional power system loads and resources that include the Federal system as well other PNW entities.

  18. Load cell having strain gauges of arbitrary location

    DOE Patents [OSTI]

    Spletzer, Barry

    2007-03-13

    A load cell utilizes a plurality of strain gauges mounted upon the load cell body such that there are six independent load-strain relations. Load is determined by applying the inverse of a load-strain sensitivity matrix to a measured strain vector. The sensitivity matrix is determined by performing a multivariate regression technique on a set of known loads correlated to the resulting strains. Temperature compensation is achieved by configuring the strain gauges as co-located orthogonal pairs.

  19. Direct Measurements of Pore Fluid Density by Vibrating Tube Densimetry

    SciTech Connect (OSTI)

    Gruszkiewicz, Miroslaw {Mirek} S; Rother, Gernot; Wesolowski, David J; Cole, David R; Wallacher, Dirk

    2012-01-01

    The densities of pore-confined fluids were measured for the first time by means of a vibrating tube method. Isotherms of total adsorption capacity were measured directly making the method complementary to the conventional gravimetric or volumetric/piezometric adsorption techniques, which yield the excess adsorption (the Gibbsian surface excess). A custom-made high-pressure, high-temperature vibrating tube densimeter (VTD) was used to measure the densities of subcritical and supercritical propane (between 35 C and 97 C) and supercritical carbon dioxide (between 32 C and 50 C) saturating hydrophobic silica aerogel (0.2 g/cm3, 90% porosity) synthesized inside Hastelloy U-tubes. Additionally, excess adsorption isotherms for supercritical CO2 and the same porous solid were measured gravimetrically using a precise magnetically-coupled microbalance. Pore fluid densities and total adsorption isotherms increased monotonically with increasing density of the bulk fluid, in contrast to excess adsorption isotherms, which reached a maximum at a subcritical density of the bulk fluid, and then decreased towards zero or negative values at supercritical densities. Compression of the confined fluid significantly beyond the density of the bulk liquid at the same temperature was observed at subcritical temperatures. The features of the isotherms of confined fluid density are interpreted to elucidate the observed behavior of excess adsorption. The maxima of excess adsorption were found to occur below the critical density of the bulk fluid at the conditions corresponding to the beginning of the plateau of total adsorption, marking the end of the transition of pore fluid to a denser, liquid-like pore phase. The results for propane and carbon dioxide showed similarity in the sense of the principle of corresponding states. No measurable effect of pore confinement on the liquid-vapor critical point was found. Quantitative agreement was obtained between excess adsorption isotherms determined from VTD total adsorption results and those measured gravimetrically at the same temperature, confirming the validity of the vibrating tube measurements. Vibrating tube densimetry was demonstrated as a novel experimental approach capable of providing the average density of pore-confined fluids.

  20. Protocells and their use for targeted delivery of multicomponent cargos to cancer cells

    DOE Patents [OSTI]

    Brinker, C Jeffrey; Ashley, Carlee Erin; Jiang, Xingmao; Liu, Juewen; Peabody, David S; Wharton, Walker Richard; Carnes, Eric; Chackerian, Bryce; Willman, Cheryl L

    2015-03-31

    Various embodiments provide materials and methods for synthesizing protocells for use in targeted delivery of cargo components to cancer cells. In one embodiment, the lipid bilayer can be fused to the porous particle core to form a protocell. The lipid bilayer can be modified with targeting ligands or other ligands to achieve targeted delivery of cargo components that are loaded within the protocell to a target cell, e.g., a type of cancer. Shielding materials can be conjugated to the surface of the lipid bilayer to reduce undesired non-specific binding.