  1. EIS-0290: Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project (AMWTP)

    Broader source: Energy.gov [DOE]

    The AMWTP Final EIS assesses the potential environmental impacts associated with alternatives related to the construction and operation of a proposed waste treatment facility at the Idaho National...

  2. Idaho Operations AMWTP Fact Sheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Waste Management » Tank Waste and Waste Processing » Idaho Operations AMWTP Fact Sheet Idaho Operations AMWTP Fact Sheet The Department of Energy's Idaho Operations Advanced Mixed Waste Treatment Project (AMWTP) is the nation's premier transuranic radioactive waste facility. This fact sheet provides an overview of the the project. Idaho Treatment Group AMWTP Fact Sheet (13.84 MB) More Documents & Publications Greenpower Trap Mufflerl System CERTIFIED REALTY SPECIALIST Heating

  3. Enterprise Assessments Targeted Review, Idaho Site AMWTP Report - January

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 | Department of Energy Review, Idaho Site AMWTP Report - January 2015 Enterprise Assessments Targeted Review, Idaho Site AMWTP Report - January 2015 January, 2015 Review of the Fire Protection Program at the Idaho Site Advanced Mixed Waste Treatment Project The U.S. Department of Energy independent Office of Enterprise Assessments (EA), Office of Environment, Safety and Health Assessments, conducted an independent review of the Advanced Mixed Waste Treatment Project (AMWTP) fire

  4. ADVANCED MIXED WASTE TREATMENT PROJECT (AMWTP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    450.2 Admin Change 1 1 1-27-15 ADMINISTRATIVE CHANGE TO NNSA SD 450.2 - Functions, Responsibilities, and Authorities (FRA) Document for Safety Management Locations of Changes: Page Paragraph Changed To Title Bottom Office of Safety and Health Office of Safety, Infrastructure, and Operations 1 1 This SD is issued to comply with the Secretary's direction concerning safety management responsibilities and assigns safety responsibilities and authorities described in the most recent version of DOE O

  5. Department of Energy Idaho - Advanced Mixed Waste Treatment Project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    > AMWTP Contract Idaho Treatment Group, LLC (ITG) Advanced Mixed Waste Treatment Project Contract Basic Contract Contract Modifications Last Updated: 10052015 Privacy Statement...

  6. Idaho’s Advanced Mixed Waste Treatment Project Details 2013 Accomplishments

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – EM and its contractor, Idaho Treatment Group (ITG), safely and compliantly met all of their production and shipping targets in the Advanced Mixed Waste Treatment Project (AMWTP) at the Idaho site in 2013.

  7. Employees Achieve Certified Success at Idaho Site’s Waste Treatment Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    IDAHO FALLS, Idaho – Employees at EM’s Advanced Mixed Waste Treatment Project (AMWTP) at the Idaho Site have finished preparing 7,231 certified waste drums so they’re at the ready to be shipped for disposal.

  8. Enterprise Assessments Targeted Review, Idaho Site AMWTP Report...

    Broader source: Energy.gov (indexed) [DOE]

    ... The equivalency request, DOE-ID-FPEQ-AMWTP-02-01, AMWTP TSA-RE Fire Suppression Systems, ... technical rescue, wildfire firefighting, and INL supervising station operation. ...

  9. Advanced Mixed Waste Treatment Project Achieves Impressive Safety and Production Marks

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – 14M50K is the new, genuinely unique vanity plate that only the 620 employees at EM’s Advanced Mixed Waste Treatment Project (AMWTP) at the Idaho site have earned the right to put on their vehicles.

  10. DOE Chooses Idaho Treatment Group, LLC to Disposition Waste at the Advanced Mixed Waste Treatment Project: Contract will continue cleanup and waste operations at the Idaho Site

    Office of Energy Efficiency and Renewable Energy (EERE)

    Idaho Falls – In order to further meet the U.S. Department of Energy’s commitments to the citizens of the state of Idaho, the DOE today announced that it has selected Idaho Treatment Group, LLC (ITG) to perform waste processing at the Advanced Mixed Waste Treatment Project (AMWTP) at DOE’s Idaho Site near Idaho Falls.

  11. Final Hanford Offsite Waste Shipment Leaves Idaho Treatment Facility

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The Advanced Mixed Waste Treatment Project (AMWTP) recently completed the last of 25 shipments of waste bound for permanent disposal in New Mexico and Nevada, six months ahead of a regulatory deadline.

  12. Idaho Treatment Group AMWTP Fact Sheet

    Office of Environmental Management (EM)

    Department of Energy Idaho Nuclear Technology and Engineering Center Tank Farm Facility Idaho Nuclear Technology and Engineering Center Tank Farm Facility The Secretary of Energy signed Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 basis of determination for the disposal of grouted residual waste in the tank systems at the Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility (TFF) on November 19, 2006. Section 3116 of the

  13. Idaho Waste Treatment Facility Improves Worker Safety and Efficiency, Saves Taxpayer Dollars

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – Continual operations improvements are integral to the mission of the Idaho site’s Advanced Mixed Waste Treatment Project (AMWTP). Two recent developments in retrieval operations save taxpayer dollars and illustrate advancements in employee safety and efficiency.

  14. Microsoft Word - FACT SHEET AMWTP Seismic.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mixed Waste Treatment Project vs. Nuclear Power Plants Implications of Japanese earthquake and tsunami Treatment - 1 Characterization - 4 Retrieval - 2 Payload - 5 Storage - 3 Shipping - 6 The recent earthquake, tsunami, and subsequent nuclear crises in Japan have renewed focus and concerns regarding the safety of the nuclear industry. The U.S. Department of Energy and Bechtel BWXT Idaho take these concerns very seriously and are confident in the safety of the Advanced Mixed Waste Treatment

  15. Process Improvements at AMWTP Will Lead to Safer, Less Expensive Processing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Radioactive Waste at DOE's Idaho Site doe logo U.S. DEPARTMENT OF ENERGY IDAHO FALLS, IDAHO, 83403 For Immediate Release: July 11, 2013 Media Contacts: Rick Dale, 208-557-6552, rick.dale@amwtp.inl.gov Danielle Miller, 208-526-5709, millerdc@id.doe.gov Process Improvements at AMWTP Will Lead to Safer, Less Expensive Processing of Radioactive Waste at DOE's Idaho Site Approximately 20,000 drums currently stored at the Department of Energy's Idaho site will feel the crushing weight of a

  16. Microsoft PowerPoint - News Flash_Idaho AMWTP_110509

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Date U.S. Department of Energy For more information on EM Recovery Act, visit: www.em.doe.gov/emrecovery Environmental Management Recovery Act Keeping You in the Know November 5, 2009 Idaho's Advanced Mixed Waste Treatment Project Completes Recovery Act Goals U.S. Department of Energy For more information on EM Recovery Act, visit: www.em.doe.gov/emrecovery With funds provided by the American Recovery and Reinvestment Act (Recovery Act) the U.S. Department of Energy's Idaho Site is shipping

  17. Voluntary Protection Program Onsite Review, Idaho Treatment Group, Llc, Advanced Mixed Waste Treatment Project- June 2014

    Broader source: Energy.gov [DOE]

    Review of ITG/AMWTP as a “transition” participant in the Department of Energy Voluntary Protection Program.

  18. DOE-Idaho Operations Summary For May 12 to May 25, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... a concrete floor as part of construction activities at an AMWTP facility. ...

  19. EIS-0290: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0290: Final Environmental Impact Statement Advanced Mixed Waste Treatment Project (AMWTP) The AMWTP Final EIS assesses the potential ...

  20. Independent Activity Report, Hanford Sludge Treatment Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sludge Treatment Project - February 2012 Independent Activity Report, Hanford Sludge Treatment Project - February 2012 February 2012 Hanford Sludge Treatment Project Operational...

  1. Microsoft Word - Transmittal of the Certification Audit Report for the Advanced Mixed Waste Treatment Program, Audit A-08-19.do

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    535:UFC 2300.00 Department of Energy Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 88221 November 25, 2008 Mr. Steve Zappe, Project Leader Hazardous Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Building 1 Santa Fe, New Mexico 87505-6303 Subject: Transmittal of the Certification Audit Report for the Advanced Mixed Waste Treatment Program, Audit A-08-19 Dear Mr. Zappe: Enclosed is the Advanced Mixed Waste Treatment Program (AMWTP) Audit Report for the

  2. DOE Awards Contract for Idaho Clean-up Project (ICP) Core | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Idaho Clean-up Project (ICP) Core DOE Awards Contract for Idaho Clean-up Project (ICP) Core February 4, 2016 - 6:15pm Addthis Media Contacts Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709 millerdc@id.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today announced the award of a contract to Fluor Idaho, LLC, for the performance of ongoing Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Clean-up Project (ICP) work scopes in

  3. Idaho's Advanced Mixed Waste Treatment Project Details 2013Accomplish...

    Office of Environmental Management (EM)

    (MLLW). The defense-related TRU waste is sent to the Waste Isolation Pilot Plant in New Mexico, and the MLLW is sent to other federal and commercial disposal sites. AMWTP is the...

  4. Waste Treatment Plant Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plant Project Waste Treatment Plant Project Presentation from the 2015 DOE National Cleanup Workshop by Peggy McCullough, Project Manager-WTP, Bechtel National. Waste Treatment Plant Project (669.27 KB) More Documents & Publications Waste Treatment Plant and Tank Farm Program Managing Large Capital Projects EIS-0391: Draft Environmental Impact Statement

  5. Employees Achieve Certified Success at Idaho Site's Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... as a regional waste treatment plant for DOE, and allows AMWTP to react quickly to any shipping demands once WIPP resumes operations," DOE-Idaho Deputy Manager Jack Zimmerman said. ...

  6. DOE SEEKS CONTRACTOR TO DISPOSITION WASTE AT THE ADVANCED MIXED WASTE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TREATMENT PROJECT (AMWTP) SEEKS CONTRACTOR TO DISPOSITION WASTE AT THE ADVANCED MIXED WASTE TREATMENT PROJECT (AMWTP) Inside the AMWTP facility The AMWTP facility Idaho Falls - The U.S. Department of Energy, Idaho Operations Office, in coordination with the Office of Environmental Management today released a Final �Request for Proposal� to obtain a contractor to perform waste processing at the Advanced Mixed Waste Treatment Project at the Department�s Idaho Site near Idaho Falls,

  7. Independent Oversight Assessment, Idaho Cleanup Project Sodium Bearing Waste Treatment Project- November 2012

    Broader source: Energy.gov [DOE]

    Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project

  8. Voluntary Protection Program Onsite Review, Waste Treatment Project...

    Office of Environmental Management (EM)

    Treatment Project - May 2006 Voluntary Protection Program Onsite Review, Waste Treatment Project - May 2006 May 2006 Evaluation of Intermech, Inc. activities at the Hanford Waste...

  9. Advanced Mixed Waste Treatment Project Achieves Impressive Safety...

    Office of Environmental Management (EM)

    Advanced Mixed Waste Treatment Project Achieves Impressive Safety and Production Marks Advanced Mixed Waste Treatment Project Achieves Impressive Safety and Production Marks June ...

  10. SRS Tank 48H Waste Treatment Project Technology Readiness Assessment...

    Office of Environmental Management (EM)

    SRS Tank 48H Waste Treatment Project Technology Readiness Assessment SRS Tank 48H Waste Treatment Project Technology Readiness Assessment Full Document and Summary Versions are ...

  11. Voluntary Protection Program Onsite Review, Waste Treatment Project - May

    Office of Environmental Management (EM)

    2006 | Department of Energy Treatment Project - May 2006 Voluntary Protection Program Onsite Review, Waste Treatment Project - May 2006 May 2006 Evaluation of Intermech, Inc. activities at the Hanford Waste Treatment Project This report summarizes the team's findings from the evaluation of Intermech, Inc. activities at the Hanford Waste Treatment Project during the week of May 1-2, 2006. Voluntary Protection Program Onsite Review, Waste Treatment Project - May 2006 (204.33 KB) More Documents

  12. Review of the Sodium Bearing Waste Treatment Project - Integrated...

    Office of Environmental Management (EM)

    Verification Review IWTU Integrated Waste Treatment Unit LCO Limiting Condition for ... Analysis Report SBWTP Sodium Bearing Waste Treatment Project SMP Safety Management ...

  13. DOE-Idaho Operations Summary For May 25 to June 14, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... compartment of a forklift at the Accelerated Retrieval Project IV facility. ...

  14. DOE-Idaho Operations Summary For July 7 to July 20, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... Idaho Cleanup Project July 6: During a facility walk-down at the Accelerated ...

  15. DOE-Idaho Operations Summary For March 8 to March 22, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). ... abatement and strip out of the basement labs and the denitrator room are ...

  16. SRS Tank 48H Waste Treatment Project Technology Readiness Assessment

    Office of Environmental Management (EM)

    Savannah River Site Tank 48H Waste Treatment Project Technology Readiness Assessment Harry ... Energy Aiken, South Carolina SRS Tank 48H Waste Treatment Project SPD-07-195 Technology ...

  17. Independent Oversight Review, Advanced Mixed Waste Treatment Project- April 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Radiation Protection Program Implementation at the Advanced Mixed Waste Treatment Project of the Idaho Site

  18. DOE-Idaho Operations Summary For December 27, 2011 to January...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... Jan. 11: A technician at the Advanced Mixed Waste Treatment Facility mistakenly ...

  19. DOE-Idaho Operations Summary For March 28 to April 24, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... a contamination buffer area at the Advanced Mixed Waste Treatment Facility. ...

  20. DOE-Idaho Operations Summary For February 15 to March 7, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... the Advanced Mixed Waste Treatment Facility, a facility representative ...

  1. DOE-Idaho Operations Summary For December 1 to December 20, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... Dec. 13: An Advanced Waste Treatment Facility employee failed to obtain ...

  2. DOE-Idaho Operations Summary For June 28 to July 18, 2011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... Advanced Mixed Waste Treatment Facility were not recorded in the required log. ...

  3. DOE-Idaho Operations Summary For July 20 to August 2, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... the Advanced Mixed Waste Treatment Facility that had been locked and tagged out ...

  4. DOE-Idaho Operations Summary For October 19 to November 1, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... processed in the Supercompactor at the Advanced Mixed Waste Treatment Facility. ...

  5. DOE-Idaho Operations Summary For May 15 to June 4, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... the Advanced Mixed Waste Treatment Facility during the week of Nov. 21, 2011. ...

  6. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) October 15, ... trend of firecombustion events in the Treatment Facility (TF) box lines. ...

  7. DOE-Idaho Operations Summary For October 23 to November 12, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... at the Advanced Waste Treatment Facility received radioactive contamination ...

  8. K Basins Sludge Treatment Project Phase 1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Phase 1 K Basins Sludge Treatment Project Phase 1 Full Document and Summary Versions are available for download K Basins Sludge Treatment Project Phase 1 (2.34 MB) More Documents & Publications Compilation of TRA Summaries Independent Activity Report, Richland Operations Office - April 2011 Enterprise Assessments, Review of the Hanford Site Sludge Treatment Project Engineered Container Retrieval and Transfer System Preliminary Documented Safety Analysis, Revision 00 - April 201

  9. AMWTP Contract Modifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    057 September 30, 2015 Funding 110 056 September 29, 2015 Change -Section B -Section C -Section F -Section J-D 154 71 113 22 54 055 August 27, 2015 Change -Section B 454 123 054...

  10. DOE Extends Advanced Mixed Waste Treatment Project Contract | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Advanced Mixed Waste Treatment Project Contract DOE Extends Advanced Mixed Waste Treatment Project Contract September 29, 2015 - 6:00pm Addthis Media Contact Danielle Miller, 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy's Office of Environmental Management (EM) today announced it is extending its contract for the Advanced Mixed Waste Treatment Project at the Idaho Site for a period of 6 months. The contract period for the current contractor, Idaho Treatment Group

  11. DOE-Idaho Operations Summary For November 15 to December 1, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... Another craftsman in the area stopped the vendor and notified the facility ...

  12. DOE-Idaho Operations Summary For April 25 to May 14, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... leaking while it was being prepared for disposition at an off-site facility. ...

  13. DOE-Idaho Operations Summary For February 12, 2013 to February...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... late February, when the facility restarts following a maintenance shut down. ...

  14. Microsoft Word - WORD FORMAT - 13-1427.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Audit A-13-01 of the Advanced Mixed Waste Treatment Project (AMWTP) for processes ... with the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit. ...

  15. DOE-Idaho Operations Summary For June 19 to July 12, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... at the Idaho Subsurface Disposal Facility is about 54 percent complete, with ...

  16. Slide 1

    Office of Environmental Management (EM)

    ... handled transuranic waste via the Advanced Mixed Waste Treatment Project (AMWTP). * At Oak Ridge, continue processing legacy debris at the Transuranic Waste Processing Facility. ...

  17. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) Nothing to ... treated, and shipped to an out-of-state facility for permanent disposal. ...

  18. DOE-Idaho Operations Summary For September 10 to October 1, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... the liner of a waste container at the Radioactive Waste Storage Facility. ...

  19. Idaho Site's New Conveyor System Improves Waste Processing Safety...

    Office of Environmental Management (EM)

    efficiency of retrieval operations at EM's Advanced Mixed Waste Treatment Project at the Idaho Site. ... The next stop is AMWTP's characterization facility. It's a process that has ...

  20. DOE-Idaho Operations Summary For Feb. 3 to Feb. 22, 2010*

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... Material Storage Facility, water was detected leaking from the fuel cask. ...

  1. DOE-Idaho Operations Summary For Nov. 10 to Nov. 23, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... When the breaker tripped and the lights went out, work was halted, facility ...

  2. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) August 2013: The ... the distillation components at its facility, where testing of the system was ...

  3. DOE-Idaho Operations Summary For Sept. 29 to Oct. 12, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... Oct. 7: During routine monitoring of the Irradiated Fuel Storage Facility, it ...

  4. DOE-Idaho Operations Summary For June 15 to July 5, 2010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... INL's ATR National Scientific User Facility back in 2008. Murty and Mohamed in ...

  5. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) Notable ... system at the Fuel Conditioning Facility, operations discovered a blown ...

  6. DOE-Idaho Operations Summary For Nov. 24 to Dec. 8, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... Specific Manufacturing Capability facility removed an electrical component ...

  7. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) Nothing to ... pressure across the PGF. The facility was shutdown undergoing a ...

  8. DOE-Idaho Operations Summary For Dec. 9 to Dec. 21, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... procedures while performing work at an Idaho Falls laboratory facility. ...

  9. DOE-Idaho Operations Summary For September 14 to September 27...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... glovebox at the Fuel Manufacturing Facility, a radiation alarm sounded, ...

  10. DOE-Idaho Operations Summary For Sept. 15 to Sept. 28, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... Method retrieval facility at the Radioactive Waste Management Complex. ...

  11. DOE-Idaho Operations Summary For Sept. 1 to Sept. 14, 2009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... existing safety analysis for the facility, and there were no criticality ...

  12. Independent Oversight Activity Report, Hanford Sludge Treatment Project – September 2013

    Broader source: Energy.gov [DOE]

    Hanford Sludge Treatment Project Engineered Container Retrieval and Transfer System Operational Awareness Review and Sludge Treatment Project Independent Project Review [HIAR-RL-2013-09-18

  13. Independent Oversight Review, Sodium Bearing Waste Treatment Project- Federal- June 2012

    Broader source: Energy.gov [DOE]

    Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review

  14. Independent Oversight Review, Sodium Bearing Waste Treatment Project- Contractor- June 2012

    Broader source: Energy.gov [DOE]

    Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Contractor Operational Readiness Review

  15. Community Water Pump and Treatment Facility PV Solar Power Project

    Office of Environmental Management (EM)

    200,000 kWhyear PROJECT LOCATION SITE DETAILS Water Pump and Treatment Facility Sole provider of water to Pueblo and its 5,000 residents 1 pump house, 2 water ...

  16. Mixed and Low-Level Waste Treatment Facility Project

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    Mixed and low-level wastes generated at the Idaho National Engineering Laboratory (INEL) are required to be managed according to applicable State and Federal regulations, and Department of Energy Orders that provide for the protection of human health and the environment. The Mixed and Low-Level Waste Treatment Facility Project was chartered in 1991, by the Department of Energy to provide treatment capability for these mixed and low-level waste streams. The first project task consisted of conducting engineering studies to identify the waste streams, their potential treatment strategies, and the requirements that would be imposed on the waste streams and the facilities used to process them. This report documents those studies so the project can continue with an evaluation of programmatic options, system tradeoff studies, and the conceptual design phase of the project. This report, appendix B, comprises the engineering design files for this project study. The engineering design files document each waste steam, its characteristics, and identified treatment strategies.

  17. AN NDA Technique for the Disposition of Mixed Low Level Waste at the Advanced Mixed Waste Treatment Project

    SciTech Connect (OSTI)

    M.J. Clapham; J.V. Seamans; R.E. Arbon

    2006-05-16

    The AMWTP is aggressively characterizing and shipping transuranic (TRU) waste to meet the DOE-IDs goal of 6000m3 of TRU waste to the Waste Isolation Pilot Plant (WIPP). The AMWTP shipping schedule requires streamlined waste movements and efficient waste characterization. Achieving this goal is complicated by the presence of waste that cannot be shipped to WIPP. A large amount of this waste is non-shippable due to the fact that no measurable TRU activity is identified during non-destructive assay (NDA).

  18. Oakland Ravine Stormwater Treatment System Project, Borough of Queens, NYC

    SciTech Connect (OSTI)

    Dinkle, R.E.; Moutal, H.P.; Evans, T.M.; Kloman, L.

    1999-07-01

    Compared to other cities, New York City (NYC) is abundantly endowed with parklands and open spaces, many of which can be utilized to treat and dissipate stormwater runoff flows, in conjunction with the preservation, restoration and creation of ecological systems. Such use of available parklands and open spaces has the benefit of decreasing cost for stormwater treatment and conveyance, while at the same time enhancing the natural biological systems. Through the combined efforts of the NYC Department of Environmental Protection (NYCDEP), which is responsible for stormwater control, and the NYC Department of Parks and Recreation (NYCDPR), which is responsible for preserving and restoring the ecological systems of parklands and open spaces, URS Greiner Woodward Clyde (URSGWC) developed a project to provide for the treatment of stormwater and the attenuation of peak stormwater flows through restoration and creation of wetlands within Oakland Ravine (located in the densely populated northeastern section of the Borough of Queens, NYC). The proposed Oakland Ravine Stormwater Treatment System Project was developed in conjunction with the East River Combined Sewer Overflow (CSO) Abatement Project, which is part of the NYC comprehensive program to reduce CSO discharges into receiving waters. Discharges into Alley Creek through Outfall TI-7, an outfall located about one-half mile northeast of the ravine which has been designated for CSO abatement, will be reduced as a result of the project.

  19. Project Execution Plan for the River Protection Project Waste Treatment & Immobilization Plant

    SciTech Connect (OSTI)

    MELLINGER, G.B.

    2003-05-03

    The Waste Treatment and Immobilization Plant (WTP), Project W-530, is the cornerstone in the mission of the Hanford Site's cleanup of more than 50 million gallons of highly toxic, high-level radioactive waste contained in aging underground storage tanks.

  20. Mixed and Low-Level Waste Treatment Facility project

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    Mixed and low-level wastes generated at the Idaho National Engineering Laboratory (INEL) are required to be managed according to applicable State and Federal regulations, and Department of Energy Orders that provide for the protection of human health and the environment. The Mixed and Low-Level Waste Treatment Facility Project was chartered in 1991, by the Department of Energy to provide treatment capability for these mixed and low-level waste streams. The first project task consisted of conducting engineering studies to identify the waste streams, their potential treatment strategies, and the requirements that would be imposed on the waste streams and the facilities used to process them. This report, Appendix A, Environmental Regulatory Planning Documentation, identifies the regulatory requirements that would be imposed on the operation or construction of a facility designed to process the INEL's waste streams. These requirements are contained in five reports that discuss the following topics: (1) an environmental compliance plan and schedule, (2) National Environmental Policy Act requirements, (3) preliminary siting requirements, (4) regulatory justification for the project, and (5) health and safety criteria.

  1. Enterprise Assessments Operational Awareness Record for the Follow-Up Review of the Idaho Site Fire Protection Program as Implemented for the IMCL and the AMWTP, OAR # EA-ID-2015-10-22

    Broader source: Energy.gov [DOE]

    Enterprise Assessments Operational Awareness Record, Idaho Site Irradiated Materials Characterization Laboratory and the Advanced Mixed Waste Treatment Project

  2. SNF sludge treatment system preliminary project execution plan

    SciTech Connect (OSTI)

    Flament, T.A.

    1998-03-03

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS.

  3. Sampling and Analysis Plan - Waste Treatment Plant Seismic Boreholes Project

    SciTech Connect (OSTI)

    Reidel, Steve P.

    2006-05-26

    This sampling and analysis plan (SAP) describes planned data collection activities for four entry boreholes through the sediment overlying the basalt, up to three new deep rotary boreholes through the basalt and sedimentary interbeds, and one corehole through the basalt and sedimentary interbeds at the Waste Treatment Plant (WTP) site. The SAP will be used in concert with the quality assurance plan for the project to guide the procedure development and data collection activities needed to support borehole drilling, geophysical measurements, and sampling. This SAP identifies the American Society of Testing Materials standards, Hanford Site procedures, and other guidance to be followed for data collection activities.

  4. Mixed and Low-Level Treatment Facility Project

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    This appendix contains the mixed and low-level waste engineering design files (EDFS) documenting each low-level and mixed waste stream investigated during preengineering studies for Mixed and Low-Level Waste Treatment Facility Project. The EDFs provide background information on mixed and low-level waste generated at the Idaho National Engineering Laboratory. They identify, characterize, and provide treatment strategies for the waste streams. Mixed waste is waste containing both radioactive and hazardous components as defined by the Atomic Energy Act and the Resource Conservation and Recovery Act, respectively. Low-level waste is waste that contains radioactivity and is not classified as high-level waste, transuranic waste, spent nuclear fuel, or 11e(2) byproduct material as defined by DOE 5820.2A. Test specimens of fissionable material irradiated for research and development only, and not for the production of power or plutonium, may be classified as low-level waste, provided the concentration of transuranic is less than 100 nCi/g. This appendix is a tool that clarifies presentation format for the EDFS. The EDFs contain waste stream characterization data and potential treatment strategies that will facilitate system tradeoff studies and conceptual design development. A total of 43 mixed waste and 55 low-level waste EDFs are provided.

  5. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) Nothing to Report Idaho Cleanup Project (ICP) December 3, 2013: A facility manager at the Idaho ...

  6. DOE-Idaho Operations Summary For September 12 to September 26...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). ... notified and a critique of the incident was scheduled. (NE-ID-BEA-INL-LABS-2011-0005). ...

  7. Sampling and Analysis Plan Waste Treatment Plant Seismic Boreholes Project.

    SciTech Connect (OSTI)

    Brouns, Thomas M.

    2007-07-15

    This sampling and analysis plan (SAP) describes planned data collection activities for four entry boreholes through the sediment overlying the Saddle Mountains Basalt, up to three new deep rotary boreholes through the Saddle Mountains Basalt and sedimentary interbeds, and one corehole through the Saddle Mountains Basalt and sedimentary interbeds at the Waste Treatment Plant (WTP) site. The SAP will be used in concert with the quality assurance plan for the project to guide the procedure development and data collection activities needed to support borehole drilling, geophysical measurements, and sampling. This SAP identifies the American Society of Testing Materials standards, Hanford Site procedures, and other guidance to be followed for data collection activities. Revision 3 incorporates all interim change notices (ICN) that were issued to Revision 2 prior to completion of sampling and analysis activities for the WTP Seismic Boreholes Project. This revision also incorporates changes to the exact number of samples submitted for dynamic testing as directed by the U.S. Army Corps of Engineers. Revision 3 represents the final version of the SAP.

  8. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) April 25: A ... north box line of the Treatment Facility. EM-ID--ITG-AMWTF-2015-0006 ...

  9. Los Alamos National Laboratory names Jeffrey Mousseau Associate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Before becoming president, Mousseau served as vice president, plant manager and waste program manager at AMWTP. During his time at AMWTP, the project compiled one of the best...

  10. Voluntary Protection Program Onsite Review, Waste Treatment Plant Construction Project- June 2010

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Waste Treatment Plant Construction Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  11. Voluntary Protection Program Onsite Review, Advanced Mixed Waste Treatment Project- May 2009

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Advanced Mixed Waste Treatment Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  12. Enterprise Assessments Review of the Hanford Site Waste Treatment and Immobilization Plant Project Engineering Processes – October 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Engineering Processes at the Hanford Site Waste Treatment and Immobilization Plant Project

  13. DPC List - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    INL - Advanced Mixed Waste Treatment Project Gail Brown browgl@amwtp.inl.gov 208-557-0913 INL-ICP-EM Carla Campbell carla.campbell@icp.doe.gov 208-533-0829 Oak Ridge Office-EM ...

  14. Microsoft Word - ICP-12-010webpost.doc

    Office of Environmental Management (EM)

    the Advanced Mixed Waste Treatment Project (AMWTP) to the ... All non-RH-TRU (i.e. low level waste, Contact Handled ... of meeting the high temperature DOE-ID NEPA CX ...

  15. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EM- ID--GOID-IDDIRECT-2015-0002 Advanced Mixed Waste Treatment Project (AMWTP) Nothing to report ... bottle in the Fuel Conditioning Facility (FCF) at the Materials and Fuels ...

  16. DOE-Idaho Operations Summary For October 2 to October 22, 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... Decision 4 for PBS-40B.C1, Nuclear Facility Decontamination & Demolition (D&D). ...

  17. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) February 3: The ... There were no immediate hazards to the workers or facility from this discovery. ...

  18. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) August 3: ... 1, Cell 2, the next to last of 14 waste cells to be completed at the facility. ...

  19. DOE-Idaho Operations Summary For January 24, 2012 to February...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho ... on the ice in the parking lot of an Idaho Falls facility, injuring his ankle. ...

  20. Microsoft Word - 07-1647mpn ltr to Zappe Final Report A-07-14...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Zappe: This letter transmits the Advanced Mixed Waste Treatment Project (AMWTP) Audit Report ... as required by Section II.C.2.c of the WIPP Hazardous Waste Facility Permit. ...

  1. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POC - Shannon Brennan, DOE-ID, (208) 526-3993. Advanced Mixed Waste Treatment Project (AMWTP) No ... There are no adverse impact to the facility or public safety as a result of the ...

  2. The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory OAS-L-13-15 September 2013 Department of Energy Washington, DC 20585 September 26, 2013 MEMORANDUM FOR THE ASSOCIATE ADMINISTRATOR FOR ACQUISITION AND PROJECT MANAGEMENT MANAGER LOS ALAMOS FIELD OFFICE FROM: David Sedillo Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos

  3. Sodium Bearing Waste Treatment Project ? Countdown to Startup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    any readiness review, DOE Federal Project Director Ric Craun said. It is also a testament to the state of readiness that these nine findings will be resolved in time to...

  4. DOE names Bechtel BWXT Idaho and the Advanced Mixed Waste Treatment Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    as a VPP Star Site names Bechtel BWXT Idaho and the Advanced Mixed Waste Treatment Project as a VPP Star Site Rick Provencher of DOE-ID, Jeff Mousseau of BBWI and co-safety chairs Tracy Anderson and Josh Wallace raise the VPP flag indicating the Advanced Mixed Waste Treatment Project is a Star site. View larger image here. The U.S. Department of Energy today announced it has recognized Bechtel BWXT Idaho at the Advanced Mixed Waste Treatment Project as a Star site in its Voluntary Protection

  5. Waste Treatment & Immobilization Plant Project - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Treatment Plant About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration Disposal Facility F Reactor

  6. Mixed and low-level waste treatment facility project

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    The technology information provided in this report is only the first step toward the identification and selection of process systems that may be recommended for a proposed mixed and low-level waste treatment facility. More specific information on each technology will be required to conduct the system and equipment tradeoff studies that will follow these preengineering studies. For example, capacity, maintainability, reliability, cost, applicability to specific waste streams, and technology availability must be further defined. This report does not currently contain all needed information; however, all major technologies considered to be potentially applicable to the treatment of mixed and low-level waste are identified and described herein. Future reports will seek to improve the depth of information on technologies.

  7. SLUDGE TREATMENT PROJECT KOP CONCEPTUAL DESIGN CONTROL DECISION REPORT

    SciTech Connect (OSTI)

    CARRO CA

    2010-03-09

    This control decision addresses the Knock-Out Pot (KOP) Disposition KOP Processing System (KPS) conceptual design. The KPS functions to (1) retrieve KOP material from canisters, (2) remove particles less than 600 {micro}m in size and low density materials from the KOP material, (3) load the KOP material into Multi-Canister Overpack (MCO) baskets, and (4) stage the MCO baskets for subsequent loading into MCOs. Hazard and accident analyses of the KPS conceptual design have been performed to incorporate safety into the design process. The hazard analysis is documented in PRC-STP-00098, Knock-Out Pot Disposition Project Conceptual Design Hazard Analysis. The accident analysis is documented in PRC-STP-CN-N-00167, Knock-Out Pot Disposition Sub-Project Canister Over Lift Accident Analysis. Based on the results of these analyses, and analyses performed in support of MCO transportation and MCO processing and storage activities at the Cold Vacuum Drying Facility (CVDF) and Canister Storage Building (CSB), control decision meetings were held to determine the controls required to protect onsite and offsite receptors and facility workers. At the conceptual design stage, these controls are primarily defined by their safety functions. Safety significant structures, systems, and components (SSCs) that could provide the identified safety functions have been selected for the conceptual design. It is anticipated that some safety SSCs identified herein will be reclassified based on hazard and accident analyses performed in support of preliminary and detailed design.

  8. Sludge treatment facility preliminary siting study for the sludge treatment project (A-13B)

    SciTech Connect (OSTI)

    WESTRA, A.G.

    1999-06-24

    This study evaluates various sites in the 100 K area and 200 areas of Hanford for locating a treatment facility for sludge from the K Basins. Both existing facilities and a new standalone facility were evaluated. A standalone facility adjacent to the AW Tank Farm in the 200 East area of Hanford is recommended as the best location for a sludge treatment facility.

  9. Process Knowledge Summary Report for Materials and Fuels Complex Contact-Handled Transuranic Debris Waste

    SciTech Connect (OSTI)

    R. P. Grant; P. J. Crane; S. Butler; M. A. Henry

    2010-02-01

    This Process Knowledge Summary Report summarizes the information collected to satisfy the transportation and waste acceptance requirements for the transfer of transuranic (TRU) waste between the Materials and Fuels Complex (MFC) and the Advanced Mixed Waste Treatment Project (AMWTP). The information collected includes documentation that addresses the requirements for AMWTP and the applicable portion of their Resource Conservation and Recovery Act permits for receipt and treatment of TRU debris waste in AMWTP. This report has been prepared for contact-handled TRU debris waste generated by the Idaho National Laboratory at MFC. The TRU debris waste will be shipped to AMWTP for purposes of supercompaction. This Process Knowledge Summary Report includes information regarding, but not limited to, the generation process, the physical form, radiological characteristics, and chemical contaminants of the TRU debris waste, prohibited items, and packaging configuration. This report, along with the referenced supporting documents, will create a defensible and auditable record for waste originating from MFC.

  10. Transition plan: Project C-018H, 200-E Area Effluent Treatment Facility

    SciTech Connect (OSTI)

    Connor, M.D.

    1994-09-29

    The purpose of this transition plan is to ensure an orderly transfer of project information to operations to satisfy Westinghouse Hanford Company (WHC) operational requirements and objectives, and ensure safe and efficient operation of Project C-018H, the 200-E Area Effluent Treatment Facility (ETF). This plan identifies the deliverables for Project C-018H upon completion of construction and turnover to WHC for operations, and includes acceptance criteria to objectively assess the adequacy of the contract deliverables in relation to present requirements. The scope of this plan includes a general discussion of the need for complete and accurate design basis documentation and design documents as project deliverables. This plan also proposes that a configuration management plan be prepared to protect and control the transferred design documents and reconstitute the design basis and design requirements, in the event that the deliverables and project documentation received from the contractor are less than adequate at turnover.

  11. Mixed and low-level waste treatment facility project. Volume 3, Waste treatment technologies (Draft)

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    The technology information provided in this report is only the first step toward the identification and selection of process systems that may be recommended for a proposed mixed and low-level waste treatment facility. More specific information on each technology will be required to conduct the system and equipment tradeoff studies that will follow these preengineering studies. For example, capacity, maintainability, reliability, cost, applicability to specific waste streams, and technology availability must be further defined. This report does not currently contain all needed information; however, all major technologies considered to be potentially applicable to the treatment of mixed and low-level waste are identified and described herein. Future reports will seek to improve the depth of information on technologies.

  12. Functional design criteria for Project W-252, Phase II Liquid Effluent Treatment and Disposal: Revision 1

    SciTech Connect (OSTI)

    Hatch, C.E.

    1994-11-10

    This document provides the functional design criteria required for the Phase 2 Liquid Effluent Treatment and Disposal Project, Project W-252. Project W-252 shall provide new facilities and existing facility modifications required to implement Best Available Technology/All Known, Available, and Reasonable Methods of Prevention, Control, and Treatment (BAT/AKART) for the 200 East Phase II Liquid Effluent Streams. The project will also provide a 200 East Area Phase II Effluent Collection System (PTECS) for connection to a disposal system for relevant effluent streams to which BAT/AKART has been applied. Liquid wastestreams generated in the 200 East Area are currently discharged to the soil column. Included in these wastestreams are cooling water, steam condensate, raw water, and sanitary wastewaters. It is the policy of the DOE that the use of soil columns to treat and retain radionuclides and nonradioactive contaminants be discontinued at the earliest practical time in favor of wastewater treatment and waste minimization. In 1989, the DOE entered into an interagency agreement with Ecology and EPA. This agreement is referred to as the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Project W-252 is one of the projects required to achieve the milestones set forth in the Tri-Party Agreement. One of the milestones requires BAT/AKART implementation for Phase II streams by October 1997. This Functional Design Criteria (FDC) document provides the technical baseline required to initiate Project W-252 to meet the Tri-Party Agreement milestone for the application of BAT/AKART to the Phase II effluents.

  13. GAO Protest to AMWTP Contract Withdrawn

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    challenges, we are pleased to be moving forward with the new contractor so that we can stay on schedule to meet our compliance milestone, said Office of Environmental...

  14. SEISMIC DESIGN REQUIREMENTS SELECTION METHODOLOGY FOR THE SLUDGE TREATMENT & M-91 SOLID WASTE PROCESSING FACILITIES PROJECTS

    SciTech Connect (OSTI)

    RYAN GW

    2008-04-25

    In complying with direction from the U.S. Department of Energy (DOE), Richland Operations Office (RL) (07-KBC-0055, 'Direction Associated with Implementation of DOE-STD-1189 for the Sludge Treatment Project,' and 08-SED-0063, 'RL Action on the Safety Design Strategy (SDS) for Obtaining Additional Solid Waste Processing Capabilities (M-91 Project) and Use of Draft DOE-STD-I 189-YR'), it has been determined that the seismic design requirements currently in the Project Hanford Management Contract (PHMC) will be modified by DOE-STD-1189, Integration of Safety into the Design Process (March 2007 draft), for these two key PHMC projects. Seismic design requirements for other PHMC facilities and projects will remain unchanged. Considering the current early Critical Decision (CD) phases of both the Sludge Treatment Project (STP) and the Solid Waste Processing Facilities (M-91) Project and a strong intent to avoid potentially costly re-work of both engineering and nuclear safety analyses, this document describes how Fluor Hanford, Inc. (FH) will maintain compliance with the PHMC by considering both the current seismic standards referenced by DOE 0 420.1 B, Facility Safety, and draft DOE-STD-1189 (i.e., ASCE/SEI 43-05, Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities, and ANSI!ANS 2.26-2004, Categorization of Nuclear Facility Structures, Systems and Components for Seismic Design, as modified by draft DOE-STD-1189) to choose the criteria that will result in the most conservative seismic design categorization and engineering design. Following the process described in this document will result in a conservative seismic design categorization and design products. This approach is expected to resolve discrepancies between the existing and new requirements and reduce the risk that project designs and analyses will require revision when the draft DOE-STD-1189 is finalized.

  15. BUNCOMBE COUNTY WASTEWATER PRE-TREATMENT AND LANDFILL GAS TO ENERGY PROJECT

    SciTech Connect (OSTI)

    Jon Creighton

    2012-03-13

    The objective of this project was to construct a landfill gas-to-energy (LFGTE) facility that generates a renewable energy source utilizing landfill gas to power a 1.4MW generator, while at the same time reducing the amount of leachate hauled offsite for treatment. The project included an enhanced gas collection and control system, gas conditioning equipment, and a 1.4 MW generator set. The production of cleaner renewable energy will help offset the carbon footprint of other energy sources that are currently utilized.

  16. Cost Transfers at the Department's Sodium Bearing Waste Treatment Facility Construction Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Office of Inspector General Office of Audits and Inspections Audit Report Cost Transfers at the Department's Sodium Bearing Waste Treatment Facility Construction Project OAS-M-13-03 August 2013 Department of Energy Washington, DC 20585 August 8, 2013 MEMORANDUM FOR THE SENIOR ADVISOR FOR ENVIRONMENTAL MANAGEMENT FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Cost Transfers at

  17. SLUDGE TREATMENT PROJECT ENGINEERED CONTAINER RETRIEVAL AND TRANSFER SYSTEM PRELIMINARY DESIGN HAZARD ANALYSIS SUPPLEMENT 1

    SciTech Connect (OSTI)

    FRANZ GR; MEICHLE RH

    2011-07-18

    This 'What/If' Hazards Analysis addresses hazards affecting the Sludge Treatment Project Engineered Container Retrieval and Transfer System (ECRTS) NPH and external events at the preliminary design stage. In addition, the hazards of the operation sequence steps for the mechanical handling operations in preparation of Sludge Transport and Storage Container (STSC), disconnect STSC and prepare STSC and Sludge Transport System (STS) for shipping are addressed.

  18. The integrated melter off-gas treatment systems at the West Valley Demonstration Project

    SciTech Connect (OSTI)

    Vance, R.F.

    1991-12-01

    The West Valley Demonstration project was established by an act of Congress in 1980 to solidify the high level radioactive liquid wastes produced from operation of the Western New York Nuclear Services Center from 1966 to 1972. The waste will be solidified as borosilicate glass. This report describes the functions, the controlling design criteria, and the resulting design of the melter off-gas treatment systems.

  19. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    SciTech Connect (OSTI)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  20. Bear Creek Valley characterization area mixed wastes passive in situ treatment technology demonstration project - status report

    SciTech Connect (OSTI)

    Watson, D.; Leavitt, M.; Moss, D.

    1997-03-01

    Historical waste disposal activities within the Bear Creek Valley (BCV) Characterization Area (CA), at the U.S. Department of Energy (DOE) Oak Ridge Y-12 plant, have contaminated groundwater and surface water above human health risk levels and impacted the ecology of Bear Creek. Contaminates include nitrate, radioisotopes, metals, volatile organic chemicals (VOCS), and common ions. This paper provides a status report on a technology demonstration project that is investigating the feasibility of using passive in situ treatment systems to remove these contaminants. Although this technology may be applicable to many locations at the Oak Ridge Y-12 Plant, the project focuses on collecting the information needed to take CERCLA removal actions in 1998 at the S-3 Disposal Ponds site. Phase 1 has been completed and included site characterization, laboratory screening of treatment media (sorbents; and iron), and limited field testing of biological treatment systems. Batch tests using different Y-12 Plant waters were conducted to evaluate the removal efficiencies of most of the media. Phase 1 results suggest that the most promising treatment media are Dowex 21 k resin, peat moss, zero-valent iron, and iron oxides. Phase 2 will include in-field column testing of these media to assess loading rates, and concerns with clogging, by-products, and long-term treatment efficiency and media stability. Continued testing of wetlands and algal mats (MATs) will be conducted to determine if they can be used for in-stream polishing of surface water. Hydraulic testing of a shallow trench and horizontal well will also be completed during Phase 2. 4 refs., 3 tabs.

  1. One System Integrated Project Team Progress in Coordinating Hanford Tank Farms and the Waste Treatment Plant

    SciTech Connect (OSTI)

    Skwarek, Raymond J.; Harp, Ben J.; Duncan, Garth M.

    2013-12-18

    The One System Integrated Project Team (IPT) was formed at the Hanford Site in late 2011 as a way to improve coordination and itegration between the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and the Tank Operations Contractor (TOC) on interfaces between the two projects, and to eliminate duplication and exploit opportunities for synergy. The IPT is composed of jointly staffed groups that work on technical issues of mutal interest, front-end design and project definition, nuclear safety, plant engineering system integration, commissioning, planning and scheduling, and environmental, safety, health and quality (ESH&Q) areas. In the past year important progress has been made in a number of areas as the organization has matured and additional opportunities have been identified. Areas covered in this paper include: Support for development of the Office of Envirnmental Management (EM) framework document to progress the Office of River Protection's (ORP) River Protection Project (RPP) mission; Stewardship of the RPP flowsheet; Collaboration with Savannah River Site (SRS), Savannah River National Laboratory (SRNL), and Pacific Northwest National Laboratory (PNNL); Operations programs integration; and, Further development of the waste acceptance criteria.

  2. Enterprise Assessments, Review of the Hanford Site Sludge Treatment Project Engineered Container Retrieval and Transfer System Preliminary Documented Safety Analysis, Revision 00- April 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Hanford Site Sludge Treatment Project Engineering Container Retrieval and Transfer System Preliminary Documented Safety Analysis

  3. SLUDGE TREATMENT PROJECT PHASE 1 SLUDGE STORAGE OPTIONS ASSESSMENT OF T PLANT VERSUS ALTERNATE STORAGE FACILITY

    SciTech Connect (OSTI)

    RUTHERFORD WW; GEUTHER WJ; STRANKMAN MR; CONRAD EA; RHOADARMER DD; BLACK DM; POTTMEYER JA

    2009-04-29

    The CH2M HILL Plateau Remediation Company (CHPRC) has recommended to the U.S. Department of Energy (DOE) a two phase approach for removal and storage (Phase 1) and treatment and packaging for offsite shipment (Phase 2) of the sludge currently stored within the 105-K West Basin. This two phased strategy enables early removal of sludge from the 105-K West Basin by 2015, allowing remediation of historical unplanned releases of waste and closure of the 100-K Area. In Phase 1, the sludge currently stored in the Engineered Containers and Settler Tanks within the 105-K West Basin will be transferred into sludge transport and storage containers (STSCs). The STSCs will be transported to an interim storage facility. In Phase 2, sludge will be processed (treated) to meet shipping and disposal requirements and the sludge will be packaged for final disposal at a geologic repository. The purpose of this study is to evaluate two alternatives for interim Phase 1 storage of K Basin sludge. The cost, schedule, and risks for sludge storage at a newly-constructed Alternate Storage Facility (ASF) are compared to those at T Plant, which has been used previously for sludge storage. Based on the results of the assessment, T Plant is recommended for Phase 1 interim storage of sludge. Key elements that support this recommendation are the following: (1) T Plant has a proven process for storing sludge; (2) T Plant storage can be implemented at a lower incremental cost than the ASF; and (3) T Plant storage has a more favorable schedule profile, which provides more float, than the ASF. Underpinning the recommendation of T Plant for sludge storage is the assumption that T Plant has a durable, extended mission independent of the K Basin sludge interim storage mission. If this assumption cannot be validated and the operating costs of T Plant are borne by the Sludge Treatment Project, the conclusions and recommendations of this study would change. The following decision-making strategy, which is

  4. Test Plan: Sludge Treatment Project Corrosion Process Chemistry Follow-on Testing

    SciTech Connect (OSTI)

    Delegard, Calvin H.; Schmidt, Andrew J.; Poloski, Adam P.

    2007-08-17

    This test plan was prepared by the Pacific Northwest National Laboratory (PNNL) under contract with Fluor Hanford (FH). The test plan describes the scope and conditions to be used to perform laboratory-scale testing of the Sludge Treatment Project (STP) hydrothermal treatment of K Basin sludge. The STP, managed for the U. S. Department of Energy (DOE) by FH, was created to design and operate a process to eliminate uranium metal from the sludge prior to packaging for Waste Isolation Pilot Plant (WIPP) by using high temperature liquid water to accelerate the reaction, produce uranium dioxide from the uranium metal, and safely discharge the hydrogen. The proposed testing builds on the approach and laboratory test findings for both K Basin sludge and simulated sludge garnered during prior testing from September 2006 to March 2007. The outlined testing in this plan is designed to yield further understanding of the nature of the chemical reactions, the effects of compositional and process variations and the effectiveness of various strategies to mitigate the observed high shear strength phenomenon observed during the prior testing. These tests are designed to provide process validation and refinement vs. process development and design input. The expected outcome is to establish a level of understanding of the chemistry such that successful operating strategies and parameters can be implemented within the confines of the existing STP corrosion vessel design. In July 2007, the DOE provided direction to FH regarding significant changes to the scope of the overall STP. As a result of the changes, FH directed PNNL to stop work on most of the planned activities covered in this test plan. Therefore, it is unlikely the testing described here will be performed. However, to preserve the test strategy and details developed to date, the test plan has been published.

  5. Hydrothermal Testing of K Basin Sludge and N Reactor Fuel at Sludge Treatment Project Operating Conditions

    SciTech Connect (OSTI)

    Delegard, Calvin H.; Schmidt, Andrew J.; Thornton, Brenda M.

    2007-03-30

    The Sludge Treatment Project (STP), managed for the U. S. DOE by Fluor Hanford (FH), was created to design and operate a process to eliminate uranium metal from K Basin sludge prior to packaging for Waste Isolation Pilot Plant (WIPP). The STP process uses high temperature liquid water to accelerate the reaction, produce uranium dioxide from the uranium metal, and safely discharge the hydrogen. Under nominal process conditions, the sludge will be heated in pressurized water at 185°C for as long as 72 hours to assure the complete reaction (corrosion) of up to 0.25-inch diameter uranium metal pieces. Under contract to FH, the Pacific Northwest National Laboratory (PNNL) conducted bench-scale testing of the STP hydrothermal process in November and December 2006. Five tests (~50 ml each) were conducted in sealed, un-agitated reaction vessels under the hydrothermal conditions (e.g., 7 to 72 h at 185°C) of the STP corrosion process using radioactive sludge samples collected from the K East Basin and particles/coupons of N Reactor fuel also taken from the K Basins. The tests were designed to evaluate and understand the chemical changes that may be occurring and the effects that any changes would have on sludge rheological properties. The tests were not designed to evaluate engineering aspects of the process. The hydrothermal treatment affected the chemical and physical properties of the sludge. In each test, significant uranium compound phase changes were identified, resulting from dehydration and chemical reduction reactions. Physical properties of the sludge were significantly altered from their initial, as-settled sludge values, including, shear strength, settled density, weight percent water, and gas retention.

  6. Evaluation of surface water treatment and discharge options for the Weldon Spring Site Remedial Action Project

    SciTech Connect (OSTI)

    Goyette, M.L.; MacDonell, M.M.

    1992-09-01

    The US Department of Energy (DOE), under its Environmental Restoration and Waste Management Program, is responsible for conducting response actions at the Weldon Spring site in St. Charles County, Missouri. The site consists of two noncontiguous areas: (1) the chemical plant area, which includes four raffinate pits and two small ponds, and (2) a 3.6-ha (9-acre) quarry located about 6.4 km (4 mi) southwest of the chemical plant area. Both of these areas became chemically and radioactively contaminated as a result of processing and disposal activities that took place from the 1940s through 1960s. The Weldon Spring site, located about 48 km (30 mi) west of St. Louis, is listed on the National Priorities List of the US Environmental Protection Agency. Nitroaromatic explosives were processed by the Army at the chemical plant area during the 1940s, and radioactive materials were processed by DOE`s predecessor agency (the Atomic Energy Commission) during the 1950s and 1960s. Overall remediation of the Weldon Spring site is being addressed through the Weldon Spring Site Remedial Action Project, and it consists of several components. One component is the management of radioactively and chemically contaminated surface water impoundments at the chemical plant area -- i.e., the four raffinate pits, Frog Pond, and Ash Pond which was addressed under a separate action and documented in an engineering evaluation/cost analysis report. This report discusses the evaluation of surface water treatment at the Weldon Spring site.

  7. Microsoft Word - 07-1647mpn ltr to Zappe Final Report A-07-14.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CBFO:QA:MPN:LC:07-1647:UFC:2300 Department of Energy Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 88221 September 27, 2007 Mr. Steve Zappe, Project Leader Hazardous Materials Bureau New Mexico Environment Department 2905 E. Rodeo Park Drive, Bldg. 1 Santa Fe, NM 87505-6313 Subject: Transmittal of the Certification Audit Report A-07-14 of the AMWTP Dear Mr. Zappe: This letter transmits the Advanced Mixed Waste Treatment Project (AMWTP) Audit Report A-07-14 for the processes performed

  8. Enterprise Assessments Review of the Hanford Site Waste Treatment and Immobilization Plant Project Engineering Processes … October 2015

    Office of Environmental Management (EM)

    Hanford Site Waste Treatment and Immobilization Plant Project Engineering Processes October 2015 Office of Nuclear Safety and Environmental Assessments Office of Environment, Safety and Health Assessments Office of Enterprise Assessments U.S. Department of Energy i Table of Contents Acronyms ...................................................................................................................................................... ii Executive Summary

  9. An Overview of Project Planning for Hot-Isostatic Pressure Treatment of High-Level Waste Calcine for the Idaho Cleanup Project - 12289

    SciTech Connect (OSTI)

    Nenni, Joseph A.; Thompson, Theron J.

    2012-07-01

    The Calcine Disposition Project is responsible for retrieval, treatment by hot-isostatic pressure, packaging, and disposal of highly radioactive calcine stored at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site in southeast Idaho. In the 2009 Amended Record of Decision: Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement the Department of Energy documented the selection of hot-isostatic pressure as the technology to treat the calcine. The Record of Decision specifies that the treatment results in a volume-reduced, monolithic waste form suitable for transport outside of Idaho by a target date of December 31, 2035. That target date is specified in the 1995 Idaho Settlement Agreement to treat and prepare the calcine for transport out of Idaho in exchange for allowing storage of Navy spent nuclear fuel at the INL Site. The project is completing the design of the calcine-treatment process and facility to comply with Record of Decision, Settlement Agreement, Idaho Department of Environmental Quality, and Department of Energy requirements. A systems engineering approach is being used to define the project mission and requirements, manage risks, and establish the safety basis for decision making in compliance with DOE O 413.3B, 'Program and Project Management for the Acquisition of Capital Assets'. The approach draws heavily on 'design-for-quality' tools to systematically add quality, predict design reliability, and manage variation in the earliest possible stages of design when it is most efficient. Use of these tools provides a standardized basis for interfacing systems to interact across system boundaries and promotes system integration on a facility-wide basis. A mass and energy model was developed to assist in the design of process equipment, determine material-flow parameters, and estimate process emissions. Data generated from failure modes and effects analysis and reliability, availability

  10. Foundation investigation and treatment for the Itaipu project, Brazil-Paraguay border

    SciTech Connect (OSTI)

    Cabrera, J.G.

    1985-01-01

    After selection of the site for this major hydroelectric project on the Parana River on the basis of hydrologic, topographic and geologic considerations, initial borings made in the river bed revealed an extremely fractured zone nearly 20 m below the bedrock surface. Conventional core recovery methods were insufficient to define the fragmented zone, therefore five borings were made at the river banks, utilizing the integral sampling method. Recovery of material, which appeared to be a fault gouge, led to the decision to sink an exploratory shaft in the right bank. From this 113 m deep shaft, short drift tunnels were driven to test the principal discontinuities in the basalt flows and the strength of the interflow breccias. Evidence of the existence of a set of intersecting shear zones soon became apparent and, after dewatering the foundation area, four access shafts were sunk within the base area of the highest blocks of the dam, from which exploratory tunnels were driven across and parallel to the river. The shear zones were revealed to be thrust faults, probably caused by buckling of the remainder of a basalt flow due to rapid dowcutting by the river and high horizontal initial stresses. All the tunnels driven for investigative purposes followed a retangular grid layout, so that they could become part of an elaborate shear key system that would prevent renewed movement of the shear zones. The final treatment plan consisted of eight tunnels parallel to the river and twelve parallel to the dam axis, backfilled with concrete through 6 inch diameter holes drilled from the foundation surface and grouted at low pressures. A few short stub tunnels driven along critical ramifications of the shear zones were also backfilled.

  11. SLUDGE TREATMENT PROJECT COST COMPARISON BETWEEN HYDRAULIC LOADING AND SMALL CANISTER LOADING CONCEPTS

    SciTech Connect (OSTI)

    GEUTHER J; CONRAD EA; RHOADARMER D

    2009-08-24

    The Sludge Treatment Project (STP) is considering two different concepts for the retrieval, loading, transport and interim storage of the K Basin sludge. The two design concepts under consideration are: (1) Hydraulic Loading Concept - In the hydraulic loading concept, the sludge is retrieved from the Engineered Containers directly into the Sludge Transport and Storage Container (STSC) while located in the STS cask in the modified KW Basin Annex. The sludge is loaded via a series of transfer, settle, decant, and filtration return steps until the STSC sludge transportation limits are met. The STSC is then transported to T Plant and placed in storage arrays in the T Plant canyon cells for interim storage. (2) Small Canister Concept - In the small canister concept, the sludge is transferred from the Engineered Containers (ECs) into a settling vessel. After settling and decanting, the sludge is loaded underwater into small canisters. The small canisters are then transferred to the existing Fuel Transport System (FTS) where they are loaded underwater into the FTS Shielded Transfer Cask (STC). The STC is raised from the basin and placed into the Cask Transfer Overpack (CTO), loaded onto the trailer in the KW Basin Annex for transport to T Plant. At T Plant, the CTO is removed from the transport trailer and placed on the canyon deck. The CTO and STC are opened and the small canisters are removed using the canyon crane and placed into an STSC. The STSC is closed, and placed in storage arrays in the T Plant canyon cells for interim storage. The purpose of the cost estimate is to provide a comparison of the two concepts described.

  12. Surrogate formulations for thermal treatment of low-level mixed waste, Part II: Selected mixed waste treatment project waste streams

    SciTech Connect (OSTI)

    Bostick, W.D.; Hoffmann, D.P.; Chiang, J.M.; Hermes, W.H.; Gibson, L.V. Jr.; Richmond, A.A.; Mayberry, J.; Frazier, G.

    1994-01-01

    This report summarizes the formulation of surrogate waste packages, representing the major bulk constituent compositions for 12 waste stream classifications selected by the US DOE Mixed Waste Treatment Program. These waste groupings include: neutral aqueous wastes; aqueous halogenated organic liquids; ash; high organic content sludges; adsorbed aqueous and organic liquids; cement sludges, ashes, and solids; chloride; sulfate, and nitrate salts; organic matrix solids; heterogeneous debris; bulk combustibles; lab packs; and lead shapes. Insofar as possible, formulation of surrogate waste packages are referenced to authentic wastes in inventory within the DOE; however, the surrogate waste packages are intended to represent generic treatability group compositions. The intent is to specify a nonradiological synthetic mixture, with a minimal number of readily available components, that can be used to represent the significant challenges anticipated for treatment of the specified waste class. Performance testing and evaluation with use of a consistent series of surrogate wastes will provide a means for the initial assessment (and intercomparability) of candidate treatment technology applicability and performance. Originally the surrogate wastes were intended for use with emerging thermal treatment systems, but use may be extended to select nonthermal systems as well.

  13. Functional design criteria for project W-252, phase II liquid effluent treatment and disposal. Revision 2

    SciTech Connect (OSTI)

    Hatch, C.E.

    1995-05-01

    This document is the Functional Design Criteria for Project W-252. Project W-252 provides the scope to provide BAT/AKART (best available technology...) to 200 Liquid Effluent Phase II streams (B-Plant). This revision (Rev. 2) incorporates a major descoping of the project. The descoping was done to reflect a combination of budget cutting measures allowed by a less stringent regulatory posture toward the Phase II streams

  14. CHALLENGES AND OPPORTUNITIES--INTEGRATED LIFE-CYCLE OPTIMIZATION INITIATIVES FOR THE HANFORD RIVER PROTECTION PROJECT--WASTE TREATMENT PLANT

    SciTech Connect (OSTI)

    Auclair, K. D.

    2002-02-25

    This paper describes the ongoing integrated life-cycle optimization efforts to achieve both design flexibility and design stability for activities associated with the Waste Treatment Plant at Hanford. Design flexibility is required to support the Department of Energy Office of River Protection Balance of Mission objectives, and design stability to meet the Waste Treatment Plant construction and commissioning requirements in order to produce first glass in 2007. The Waste Treatment Plant is a large complex project that is driven by both technology and contractual requirements. It is also part of a larger overall mission, as a component of the River Protection Project, which is driven by programmatic requirements and regulatory, legal, and fiscal constraints. These issues are further complicated by the fact that both of the major contractors involved have a different contract type with DOE, and neither has a contract with the other. This combination of technical and programmatic drivers, constraints, and requirements will continue to provide challenges and opportunities for improvement and optimization. The Bechtel National, Inc. team is under contract to engineer, procure, construct, commission and test the Waste Treatment Plant on or ahead of schedule, at or under cost, and with a throughput capacity equal to or better than specified. The Department of Energy is tasked with the long term mission of waste retrieval, treatment, and disposal. While each mission is a compliment and inextricably linked to one another, they are also at opposite ends of the spectrum, in terms of expectations of one another. These mission requirements, that are seemingly in opposition to one another, pose the single largest challenge and opportunity for optimization: one of balance. While it is recognized that design maturation and optimization are the normal responsibility of any engineering firm responsible for any given project, the aspects of integrating requirements and the management

  15. 'In vivo' Dose Measurements in High-Dose-Rate Brachytherapy Treatments for Cervical Cancer: A Project Proposal

    SciTech Connect (OSTI)

    Reynoso Mejia, C. A.; Buenfil Burgos, A. E.; Ruiz Trejo, C.; Mota Garcia, A.; Trejo Duran, E.; Rodriguez Ponce, M.; Gamboa de Buen, I.

    2010-12-07

    The aim of this thesis project is to compare doses calculated from the treatment planning system using computed tomography images, with those measured 'in vivo' by using thermoluminescent dosimeters placed at different regions of the rectum and bladder of a patient during high-dose-rate intracavitary brachytherapy treatment of uterine cervical carcinoma. The experimental dosimeters characterisation and calibration have concluded and the protocol to carry out the 'in vivo' measurements has been established. In this work, the calibration curves of two types of thermoluminescent dosimeters (rods and chips) are presented, and the proposed protocol to measure the 'in vivo' dose is fully described.

  16. SLUDGE TREATMENT PROJECT ENGINEERED CONTAINER RETRIEVAL AND TRANSFER SYSTEM PRELMINARY DESIGN HAZARD AND OPERABILITY STUDY

    SciTech Connect (OSTI)

    CARRO CA

    2011-07-15

    This Hazard and Operability (HAZOP) study addresses the Sludge Treatment Project (STP) Engineered Container Retrieval and Transfer System (ECRTS) preliminary design for retrieving sludge from underwater engineered containers located in the 105-K West (KW) Basin, transferring the sludge as a sludge-water slurry (hereafter referred to as 'slurry') to a Sludge Transport and Storage Container (STSC) located in a Modified KW Basin Annex, and preparing the STSC for transport to T Plant using the Sludge Transport System (STS). There are six, underwater engineered containers located in the KW Basin that, at the time of sludge retrieval, will contain an estimated volume of 5.2 m{sup 3} of KW Basin floor and pit sludge, 18.4 m{sup 3} of 105-K East (KE) Basin floor, pit, and canister sludge, and 3.5 m{sup 3} of settler tank sludge. The KE and KW Basin sludge consists of fuel corrosion products (including metallic uranium, and fission and activation products), small fuel fragments, iron and aluminum oxide, sand, dirt, operational debris, and biological debris. The settler tank sludge consists of sludge generated by the washing of KE and KW Basin fuel in the Primary Clean Machine. A detailed description of the origin of sludge and its chemical and physical characteristics can be found in HNF-41051, Preliminary STP Container and Settler Sludge Process System Description and Material Balance. In summary, the ECRTS retrieves sludge from the engineered containers and hydraulically transfers it as a slurry into an STSC positioned within a trailer-mounted STS cask located in a Modified KW Basin Annex. The slurry is allowed to settle within the STSC to concentrate the solids and clarify the supernate. After a prescribed settling period the supernate is decanted. The decanted supernate is filtered through a sand filter and returned to the basin. Subsequent batches of slurry are added to the STSC, settled, and excess supernate removed until the prescribed quantity of sludge is collected

  17. Issues Pertaining to the Termination of Ms. Donna Busche, a Contractor Employee at the Waste Treatment Plant Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REVIEW Issues Pertaining to the Termination of Ms. Donna Busche, a Contractor Employee at the Waste Treatment Plant Project DOE/IG-0923 October 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 October 17, 2014 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: Special Review of "Issues Pertaining to the Termination of Ms. Donna Busche, a Contractor Employee at the Waste

  18. Mixed and Low-Level Waste Treatment Facility project. Appendix A, Environmental and regulatory planning and documentation: Draft

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    Mixed and low-level wastes generated at the Idaho National Engineering Laboratory (INEL) are required to be managed according to applicable State and Federal regulations, and Department of Energy Orders that provide for the protection of human health and the environment. The Mixed and Low-Level Waste Treatment Facility Project was chartered in 1991, by the Department of Energy to provide treatment capability for these mixed and low-level waste streams. The first project task consisted of conducting engineering studies to identify the waste streams, their potential treatment strategies, and the requirements that would be imposed on the waste streams and the facilities used to process them. This report, Appendix A, Environmental & Regulatory Planning & Documentation, identifies the regulatory requirements that would be imposed on the operation or construction of a facility designed to process the INEL`s waste streams. These requirements are contained in five reports that discuss the following topics: (1) an environmental compliance plan and schedule, (2) National Environmental Policy Act requirements, (3) preliminary siting requirements, (4) regulatory justification for the project, and (5) health and safety criteria.

  19. EM Cleanup Crew Nears Finish at Idaho Transuranic Waste Storage Facility

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – Working deliberately under demanding conditions, workers have entered the final storage “cell” to remove drums and boxes of waste from the Transuranic Storage Area–Retrieval Enclosure (TSA-RE) at the Department’s Advanced Mixed Waste Treatment Project (AMWTP) in Idaho.

  20. Idaho Site Cleanup Employees Look Forward to Handling Robotic Arms

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – Shirley Perez may be the most excited person ready to get her hands on new robotic arms when they are installed in the EM Idaho Site’s Advanced Mixed Waste Treatment Project (AMWTP) boxlines this fall.

  1. Grand Junction projects office mixed-waste treatment program, VAC*TRAX mobile treatment unit process hazards analysis

    SciTech Connect (OSTI)

    Bloom, R.R.

    1996-04-01

    The objective of this report is to demonstrate that a thorough assessment of the risks associated with the operation of the Rust Geotech patented VAC*TRAX mobile treatment unit (MTU) has been performed and documented. The MTU was developed to treat mixed wastes at the US Department of Energy (DOE) Albuquerque Operations Office sites. The MTU uses an indirectly heated, batch vacuum dryer to thermally desorb organic compounds from mixed wastes. This process hazards analysis evaluated 102 potential hazards. The three significant hazards identified involved the inclusion of oxygen in a process that also included an ignition source and fuel. Changes to the design of the MTU were made concurrent with the hazard identification and analysis; all hazards with initial risk rankings of 1 or 2 were reduced to acceptable risk rankings of 3 or 4. The overall risk to any population group from operation of the MTU was determined to be very low; the MTU is classified as a Radiological Facility with low hazards.

  2. SLUDGE TREATMENT PROJECT KOP DISPOSITION - THERMAL AND GAS ANALYSIS FOR THE COLD VACUUM DRYING FACILITY

    SciTech Connect (OSTI)

    SWENSON JA; CROWE RD; APTHORPE R; PLYS MG

    2010-03-09

    The purpose of this document is to present conceptual design phase thermal process calculations that support the process design and process safety basis for the cold vacuum drying of K Basin KOP material. This document is intended to demonstrate that the conceptual approach: (1) Represents a workable process design that is suitable for development in preliminary design; and (2) Will support formal safety documentation to be prepared during the definitive design phase to establish an acceptable safety basis. The Sludge Treatment Project (STP) is responsible for the disposition of Knock Out Pot (KOP) sludge within the 105-K West (KW) Basin. KOP sludge consists of size segregated material (primarily canister particulate) from the fuel and scrap cleaning process used in the Spent Nuclear Fuel process at K Basin. The KOP sludge will be pre-treated to remove fines and some of the constituents containing chemically bound water, after which it is referred to as KOP material. The KOP material will then be loaded into a Multi-Canister Overpack (MCO), dried at the Cold Vacuum Drying Facility (CVDF) and stored in the Canister Storage Building (CSB). This process is patterned after the successful drying of 2100 metric tons of spent fuel, and uses the same facilities and much of the same equipment that was used for drying fuel and scrap. Table ES-l present similarities and differences between KOP material and fuel and between MCOs loaded with these materials. The potential content of bound water bearing constituents limits the mass ofKOP material in an MCO load to a fraction of that in an MCO containing fuel and scrap; however, the small particle size of the KOP material causes the surface area to be significantly higher. This relatively large reactive surface area represents an input to the KOP thermal calculations that is significantly different from the calculations for fuel MCOs. The conceptual design provides for a copper insert block that limits the volume available to

  3. Summary Report of Geophysical Logging For The Seismic Boreholes Project at the Hanford Site Waste Treatment Plant.

    SciTech Connect (OSTI)

    Gardner, Martin G.; Price, Randall K.

    2007-02-01

    During the period of June through October 2006, three deep boreholes and one corehole were drilled beneath the site of the Waste Treatment Plant (WTP) at the U.S. Department of Energy (DOE) Hanford Site near Richland, Washington. The boreholes were drilled to provide information on ground-motion attenuation in the basalt and interbedded sediments underlying the WTP site. This report describes the geophysical logging of the deep boreholes that was conducted in support of the Seismic Boreholes Project, defined below. The detailed drilling and geological descriptions of the boreholes and seismic data collected and analysis of that data are reported elsewhere.

  4. Advanced conceptual design report. Phase II. Liquid effluent treatment and disposal Project W-252

    SciTech Connect (OSTI)

    1995-01-31

    This Advanced Conceptual Design Report (ACDR) provides a documented review and analysis of the Conceptual Design Report (CDR), WHC-SD-W252-CDR-001, June 30, 1993. The ACDR provides further design evaluation of the major design approaches and uncertainties identified in the original CDR. The ACDR will provide a firmer basis for the both the design approach and the associated planning for the performance of the Definitive Design phase of the project.

  5. Borehole Summary Report for Core Hole C4998 Waste Treatment Plant Seismic Boreholes Project

    SciTech Connect (OSTI)

    Barnett, D. BRENT; Garcia, Benjamin J.

    2006-12-15

    Seismic borehole C4998 was cored through the upper portion of the Columbia River Basalt Group and Ellensburg Formation to provide detailed lithologic information and intact rock samples that represent the geology at the Waste Treatment Plant. This report describes the drilling of borehole C4998 and documents the geologic data collected during the drilling of the cored portion of the borehole.

  6. DOE intends to extend the Advanced Mixed Waste Treatment Project contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy DOE in the News: Tidal Power in Maine on PBS Newshour DOE in the News: Tidal Power in Maine on PBS Newshour September 18, 2013 - 11:54am Addthis The Water Power Program received national TV exposure on the September 15th episode of "PBS Newshour Weekend" for its pioneering tidal power project in the state of Maine with Ocean Renewable Power Corporation (ORPC). The Newshour segment, featuring an interview with Jose Zayas, focuses on the deployment of ORPC's TidGen device in

  7. Mobile treatment modules for the Rhode Island environmental training center. Project report

    SciTech Connect (OSTI)

    Herriot, D.

    1994-12-01

    Groundwater pollution can result from many activities, including leaching from landfills and abandoned dump sites, accidental spills of chemicals or waste materials, improper underground injection of liquids, and leakage from faulty septic systems or underground storage tanks. Discoveries of aquifer pollution from man`s waste disposal practices are increasing. A recent trend, is to fast track the remediation process by employing mobile units which can be quickly set up and put into operation to address the contamination problem with the speed and urgency it deserves. The traditional study, design, and construction of a site-specific treatment process simply takes too long. Mobile units can serve as an interim treatment system to expeditiously control migration, and address public health and safety concerns while time and technology work together for a permanent, cost-effective remediation plan.

  8. Bescorp soil washing system for lead battery site treatment. Applications analysis report. Project report

    SciTech Connect (OSTI)

    Gaire, R.J.

    1995-01-01

    The Brice Environmental Services Corporation (BESCORP) Soil Washing System (BSWS) and its applicability in remediating lead-contaminated soil at lead battery sites was evaluated. The report presents performance and economic data, developed from the U.S. Environmental Protection Agency Superfund Innovative Technology Evaluation (SITE) demonstration (three test runs) and additional data provided by the developer. The demonstration took place at the Alaskan Battery Enterprises (ABE) site in Fairbanks, Alaska. Economic data for a commercial 20-tph unit processing wastes similar to those treated in the SITE Demonstration, including disposal of waste effluents, project operating costs to be about $165/ton of soil (dry basis) containing 6.6 wt percent moisture. This figure does not reflect any revenue from recycling of metallic lead or cashing chips.

  9. Conceptual Site Treatment Plan Laboratory for Energy-Related Health Research Environmental Restoration Project

    SciTech Connect (OSTI)

    Chapman, T.E.

    1993-10-01

    The Federal Facilities Compliance Act (the Act) of 1992 waives sovereign immunity for federal facilities for fines and penalties under the provisions of the Resource Recovery and Conservation Act, state, interstate, and local hazardous and solid waste management requirements. However, for three years the Act delays the waiver for violations involving US Department of Energy (DOE) facilities. The Act, however, requires that the DOE prepare a Conceptual Site Treatment Plan (CSTP) for each of its sites that generate or store mixed wastes (MWs). The purpose of the CSTP is to present DOE`s preliminary evaluations of the development of treatment capacities and technologies for treating a site`s MW. This CSTP presents the preliminary capacity and technology evaluation for the Laboratory for Energy-Related Health Research (LEHR). The five identified MW streams at LEHR are evaluated to the extent possible given available information. Only one MW stream is sufficiently well defined to permit a technology evaluation to be performed. Two other MW streams are in the process of being characterized so that an evaluation can be performed. The other two MW streams will be generated by the decommissioning of inactive facilities onsite within the next five years.

  10. Mixed and Low-Level Treatment Facility Project. Appendix B, Waste stream engineering files, Part 1, Mixed waste streams

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    This appendix contains the mixed and low-level waste engineering design files (EDFS) documenting each low-level and mixed waste stream investigated during preengineering studies for Mixed and Low-Level Waste Treatment Facility Project. The EDFs provide background information on mixed and low-level waste generated at the Idaho National Engineering Laboratory. They identify, characterize, and provide treatment strategies for the waste streams. Mixed waste is waste containing both radioactive and hazardous components as defined by the Atomic Energy Act and the Resource Conservation and Recovery Act, respectively. Low-level waste is waste that contains radioactivity and is not classified as high-level waste, transuranic waste, spent nuclear fuel, or 11e(2) byproduct material as defined by DOE 5820.2A. Test specimens of fissionable material irradiated for research and development only, and not for the production of power or plutonium, may be classified as low-level waste, provided the concentration of transuranic is less than 100 nCi/g. This appendix is a tool that clarifies presentation format for the EDFS. The EDFs contain waste stream characterization data and potential treatment strategies that will facilitate system tradeoff studies and conceptual design development. A total of 43 mixed waste and 55 low-level waste EDFs are provided.

  11. One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

    SciTech Connect (OSTI)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    2013-07-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  12. One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

    SciTech Connect (OSTI)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    2012-12-20

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  13. Slide 1

    Broader source: Energy.gov (indexed) [DOE]

    Mixed Waste Treatment Project Danny Nichols President and Project Manager Idaho Treatment Group April 30, 2014 2 Workers at AMWTP focus on the safe and compliant retrieval, characterization, treatment and shipment of legacy stored, contact- handled transuranic waste, estimated at 65,000 cubic meters, and mixed low- level waste for permanent disposal at sites outside of Idaho and to support the receipt and processing of transuranic waste from other DOE sites for shipment to the Department's Waste

  14. Engineering evaluation of solids/liquids separation processes applicable to sludge treatment project

    SciTech Connect (OSTI)

    Duncan, J.B.

    1998-08-25

    This engineering study looks at the solids/liquids separation unit operations after the acid dissolution of the K Basin sludge treatment. Unit operations considered were centrifugation, filtration (cartridge, cross flow, and high shear filtration) and gravity settling. The recommended unit operations for the solids/liquids separations are based upon the efficiency, complexity, and off-the-shelf availability and adaptability. The unit operations recommended were a Robatel DPC 900 centrifuge followed by a nuclearized 31WM cartridge filter. The Robatel DPC 900 has been successfully employed in the nuclear industry on a world wide scale. The 31WM cartridge filter has been employed for filtration campaigns in both the government and civilian nuclear arenas.

  15. Enterprise Assessments Targeted Review, Idaho Site AMWTP Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The U.S. Department of Energy independent Office of Enterprise Assessments (EA), Office of Environment, Safety and Health Assessments, conducted an independent review of the ...

  16. GAO Protest to AMWTP Contract Withdrawn | Department of Energy

    Office of Environmental Management (EM)

    challenges, we are pleased to be moving forward with the new contractor so that we can stay on schedule to meet our compliance milestone," said Office of Environmental Management...

  17. AMWTP Receives Award of Excellence for Safety | Department of Energy

    Office of Environmental Management (EM)

    Programs Highlighted at Capitol Hill Event AMO Programs Highlighted at Capitol Hill Event July 13, 2016 - 2:44pm Addthis Event attendees talk to EERE representatives and read materials to learn about AMO programs and technologies sponsored by the Department of Energy. Event attendees talk to EERE representatives and read materials to learn about AMO programs and technologies sponsored by the Department of Energy. On Tuesday, July 12, the 19th Annual Congressional Renewable Energy and Energy

  18. PIA - AMWTP Information Systems Enclave | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Registration, PIA, Idaho National Laboratory Occupational Medical Surveillance System (OMSS) PIA, Idaho National Laboratory PIA - Bonneville Power Adminstration Ethics Helpline

  19. Savannah River Site Tank 48H Waste Treatment Project Technology Readiness Assessment

    SciTech Connect (OSTI)

    Harmon, H.D.; Young, J.K.; Berkowitz, J.B.; DeVine, Jr.J.C.; Sutter, H.G.

    2008-07-01

    One of U.S. Department of Energy's (DOE) primary missions at Savannah River Site (SRS) is to retrieve and treat the high level waste (HLW) remaining in SRS tanks and close the F and H tank farms. At present, a significant impediment to timely completion of this mission is the presence of significant organic chemical contamination in Tank 48H. Tank 48H is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system. However, the tank has been isolated from the system and unavailable for use since 1983, because its contents - approximately 250,000 gallons of salt solution containing Cs-137 and other radioisotopes - are contaminated with nearly 22,000 Kg of tetraphenylborate, a material which can release benzene vapor to the tank head space in potentially flammable concentrations. An important element of the DOE SRS mission is to remove, process, and dispose of the contents of Tank 48H, both to eliminate the hazard it presents to the SRS H-Tank Farm and to return Tank 48H to service. Tank 48H must be returned to service to support operation of the Salt Waste Processing Facility, to free up HLW tank space, and to allow orderly tank closures per Federal Facility Agreement commitments. The Washington Savannah River Company (WSRC), the SRS prime contractor, has evaluated alternatives and selected two processes, Wet Air Oxidation (WAO) and Fluidized Steam Bed Reforming (FBSR) as candidates for Tank 48H processing. Over the past year, WSRC has been testing and evaluating these two processes, and DOE is nearing a final technology selection in late 2007. In parallel with WSRC's ongoing work, DOE convened a team of independent qualified experts to conduct a Technology Readiness Assessment (TRA). The purpose of the TRA was to determine the maturity level of the Tank 48H treatment technology candidates - WAO and FBSR. The methodology used for this TRA is based on detailed guidance for conducting TRAs contained in the Department

  20. SAVANNAH RIVER SITE TANK 48H WASTE TREATMENT PROJECT TECHNOLOGY READINESS ASSESSMENT

    SciTech Connect (OSTI)

    Harmon, Harry D.; Young, Joan K.; Berkowitz, Joan B.; Devine, John C.; Sutter, Herbert G.

    2008-10-25

    ABSTRACT One of U.S. Department of Energys (DOE) primary missions at Savannah River Site (SRS) is to retrieve and treat the high level waste (HLW) remaining in SRS tanks and close the F&H tank farms. At present, a significant impediment to timely completion of this mission is the presence of significant organic chemical contamination in Tank 48H. Tank 48H is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system. However, the tank has been isolated from the system and unavailable for use since 1983, because its contents approximately 250,000 gallons of salt solution containing Cs-137 and other radioisotopes are contaminated with nearly 22,000 Kg of tetraphenylborate, a material which can release benzene vapor to the tank head space in potentially flammable concentrations. An important element of the DOE SRS mission is to remove, process, and dispose of the contents of Tank 48H, both to eliminate the hazard it presents to the SRS H-Tank Farm and to return Tank 48H to service. Tank 48H must be returned to service to support operation of the Salt Waste Processing Facility, to free up HLW tank space, and to allow orderly tank closures per Federal Facility Agreement commitments. The Washington Savannah River Company (WSRC), the SRS prime contractor, has evaluated alternatives and selected two processes, Wet Air Oxidation (WAO) and Fluidized Steam Bed Reforming (FBSR) as candidates for Tank 48H processing. Over the past year, WSRC has been testing and evaluating these two processes, and DOE is nearing a final technology selection in late 2007. In parallel with WSRCs ongoing work, DOE convened a team of independent qualified experts to conduct a Technology Readiness Assessment (TRA). The purpose of the TRA was to determine the maturity level of the Tank 48H treatment technology candidates WAO and FBSR. The methodology used for this TRA is based on detailed guidance for conducting TRAs contained in the

  1. SAVANNAH RIVER SITE TANK 48H WASTE TREATMENT PROJECT TECHNOLOGY READINESS ASSESSMENT

    SciTech Connect (OSTI)

    Harmon, Harry D.; Young, Joan K.; Berkowitz, Joan B.; Devine, John C.; Sutter, Herbert G.

    2008-03-18

    One of U.S. Department of Energy's (DOE) primary missions at Savannah River Site (SRS) is to retrieve and treat the high level waste (HLW) remaining in SRS tanks and close the F&H tank farms. At present, a significant impediment to timely completion of this mission is the presence of significant organic chemical contamination in Tank 48H. Tank 48H is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system. However, the tank has been isolated from the system and unavailable for use since 1983, because its contents - approximately 250,000 gallons of salt solution containing Cs-137 and other radioisotopes - are contaminated with nearly 22,000 Kg of tetraphenylborate, a material which can release benzene vapor to the tank head space in potentially flammable concentrations. An important element of the DOE SRS mission is to remove, process, and dispose of the contents of Tank 48H, both to eliminate the hazard it presents to the SRS H-Tank Farm and to return Tank 48H to service. Tank 48H must be returned to service to support operation of the Salt Waste Processing Facility, to free up HLW tank space, and to allow orderly tank closures per Federal Facility Agreement commitments. The Washington Savannah River Company (WSRC), the SRS prime contractor, has evaluated alternatives and selected two processes, Wet Air Oxidation (WAO) and Fluidized Steam Bed Reforming (FBSR) as candidates for Tank 48H processing. Over the past year, WSRC has been testing and evaluating these two processes, and DOE is nearing a final technology selection in late 2007. In parallel with WSRC's ongoing work, DOE convened a team of independent qualified experts to conduct a Technology Readiness Assessment (TRA). The purpose of the TRA was to determine the maturity level of the Tank 48H treatment technology candidates - WAO and FBSR. The methodology used for this TRA is based on detailed guidance for conducting TRAs contained in the Department of

  2. Mixed and Low-Level Waste Treatment Facility Project. Appendix B, Waste stream engineering files: Part 2, Low-level waste streams

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    Mixed and low-level wastes generated at the Idaho National Engineering Laboratory (INEL) are required to be managed according to applicable State and Federal regulations, and Department of Energy Orders that provide for the protection of human health and the environment. The Mixed and Low-Level Waste Treatment Facility Project was chartered in 1991, by the Department of Energy to provide treatment capability for these mixed and low-level waste streams. The first project task consisted of conducting engineering studies to identify the waste streams, their potential treatment strategies, and the requirements that would be imposed on the waste streams and the facilities used to process them. This report documents those studies so the project can continue with an evaluation of programmatic options, system tradeoff studies, and the conceptual design phase of the project. This report, appendix B, comprises the engineering design files for this project study. The engineering design files document each waste steam, its characteristics, and identified treatment strategies.

  3. Microsoft Word - DOE-ID-11-021 - North Wind EC.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 SECTION A. Project Title: Idaho National Laboratory Asphalt Repair Project - North Wind Services, LLC SECTION B. Project Description The deterioration of asphalt roads, pads and parking areas at Idaho National Laboratory (INL) facilities necessitates the repair and or replacement in selected areas. Repair and/or replacement of sections of asphalt roads, pads, walkways, and parking areas will be conducted at Advanced Mixed Waste Treatment Facility (AMWTP), Idaho Nuclear Technology and

  4. CO-operation development project for new treatment of steam generator's - impact on final disposal volumes and recycling in Northern Europe

    SciTech Connect (OSTI)

    Wirendal, B.O.; Lindstrom, A.; Lindberg, M.; Hansson, T.

    2007-07-01

    This paper describes a real case of cost effective volume reduction of a retired, full size SG removed from the Ringhals Nuclear Power Plant, Sweden. The project is described from the first step of fulfilling the demands from the authorities before treatment to the results of the treatment. The evaluations of the method is also included and compared to the other possibilities and the driving forces that work in favour of our method. The waste owners' strategy is also described in this paper. Finally is the method of treatment described as a principle as well as the results. Technical details as well as detailed results are given in Paper 7131 [ref 1]. (authors)

  5. Independent Oversight Activity Report, Hanford Sludge Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sludge Treatment Project - September 2013 Independent Oversight Activity Report, Hanford Sludge Treatment Project - September 2013 November 2013 Hanford Sludge Treatment Project...

  6. Department of Energy Idaho - Contracts, Financial Assistance &

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Solicitations Contracts, Financial Assistance & Solicitations Contracts, Financial Assistance & Solicitations Procurement and Acquisition, Doing Business With the U.S. Department of Energy Financial Assistance Forms and Information For Applicants and Recipients DOE Site Facility Management Contracts Internet Posting ACQUISITION Selected Contracts of Public Interest ICP Core Contract - Fluor Idaho, LLC Advanced Mixed Waste Treatment Project (AMWTP) Contract Idaho Cleanup Project (ICP)

  7. Independent Oversight Assessment, Idaho Cleanup Project Sodium...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project This report...

  8. Assessment of Nuclear Safety Culture at the Idaho Cleanup Project...

    Office of Environmental Management (EM)

    the Idaho Cleanup Project Sodium Bearing Waste Treatment Project May 2011 November 2012 ... the Idaho Cleanup Project Sodium Bearing Waste Treatment Project Table of Contents 1.0 ...

  9. Radiological, physical, and chemical characterization of additional alpha contaminated and mixed low-level waste for treatment at the advanced mixed waste treatment project

    SciTech Connect (OSTI)

    Hutchinson, D.P.

    1995-07-01

    This document provides physical, chemical, and radiological descriptive information for a portion of mixed waste that is potentially available for private sector treatment. The format and contents are designed to provide treatment vendors with preliminary information on the characteristics and properties for additional candidate portions of the Idaho National Engineering Laboratory (INEL) and offsite mixed wastes not covered in the two previous characterization reports for the INEL-stored low-level alpha-contaminated and transuranic wastes. This report defines the waste, provides background information, briefly reviews the requirements of the Federal Facility Compliance Act (P.L. 102-386), and relates the Site Treatment Plans developed under the Federal Facility Compliance Act to the waste streams described herein. Each waste is summarized in a Waste Profile Sheet with text, charts, and tables of waste descriptive information for a particular waste stream. A discussion of the availability and uncertainty of data for these waste streams precedes the characterization descriptions.

  10. Optimal Conventional and Semi-Natural Treatments for the Upper Yakima Spring Chinook Salmon Supplementation Project; Treatment Definitions and Descriptions and Biological Specifications for Facility Design, 1995-1999 Final Report.

    SciTech Connect (OSTI)

    Hager, Robert C.; Costello, Ronald J.

    1999-10-01

    This report describes the Yakima Fisheries Project facilities (Cle Elum Hatchery and acclimation satellites) which provide the mechanism to conduct state-of-the-art research for addressing questions about spring chinook supplementation strategies. The definition, descriptions, and specifications for the Yakima spring chinook supplementation program permit evaluation of alternative fish culture techniques that should yield improved methods and procedures to produce wild-like fish with higher survival that can be used to rebuild depleted spring chinook stocks of the Columbia River Basin. The definition and description of three experimental treatments, Optimal Conventional (OCT), Semi-Natural (SNT), Limited Semi-Natural (LSNT), and the biological specifications for facilities have been completed for the upper Yakima spring chinook salmon stock of the Yakima Fisheries Project. The task was performed by the Biological Specifications Work Group (BSWG) represented by Yakama Indian Nation, Washington Department of Fish and Wildlife, National Marine Fisheries Service, and Bonneville Power Administration. The control and experimental variables of the experimental treatments (OCT, SNT, and LSNT) are described in sufficient detail to assure that the fish culture facilities will be designed and operated as a production scale laboratory to produce and test supplemented upper Yakima spring chinook salmon. Product specifications of the treatment groups are proposed to serve as the generic templates for developing greater specificity for measurements of product attributes. These product specifications will be used to monitor and evaluate treatment effects, with respect to the biological response variables (post release survival, long-term fitness, reproductive success and ecological interactions).

  11. Microsoft Word - SSAB Meeting Summary for April 2015.FINAL.docx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DoubleTree by Hilton Hotel 2651 Perimeter Parkway, Augusta, Georgia 30909 April 22-23, 2015 2 Environmental Management Site-Specific Advisory Board - April 22-23, 2015 Meeting Minutes LIST OF ACRONYMS AIB - Accident Investigation Board AMWTP - Advanced Mixed Waste Treatment Project ANA - Alliance for Nuclear Accountability CAB - Citizens Advisory Board CROET - Community Reuse Organization of East Tennessee DDFO - Deputy Designated Federal Officer DOE - Department of Energy DUF6 - Depleted

  12. Environmental assessment for the treatment of Class A low-level radioactive waste and mixed low-level waste generated by the West Valley Demonstration Project

    SciTech Connect (OSTI)

    1995-11-01

    The U.S. Department of Energy (DOE) is currently evaluating low-level radioactive waste management alternatives at the West Valley Demonstration Project (WVDP) located on the Western New York Nuclear Service Center (WNYNSC) near West Valley, New York. The WVDP`s mission is to vitrify high-level radioactive waste resulting from commercial fuel reprocessing operations that took place at the WNYNSC from 1966 to 1972. During the process of high-level waste vitrification, low-level radioactive waste (LLW) and mixed low-level waste (MILLW) will result and must be properly managed. It is estimated that the WVDP`s LLW storage facilities will be filled to capacity in 1996. In order to provide sufficient safe storage of LLW until disposal options become available and partially fulfill requirements under the Federal Facilities Compliance Act (FFCA), the DOE is proposing to use U.S. Nuclear Regulatory Commission-licensed and permitted commercial facilities in Oak Ridge, Tennessee; Clive, Utah; and Houston, Texas to treat (volume-reduce) a limited amount of Class A LLW and MLLW generated from the WVDP. Alternatives for ultimate disposal of the West Valley LLW are currently being evaluated in an environmental impact statement. This proposed action is for a limited quantity of waste, over a limited period of time, and for treatment only; this proposal does not include disposal. The proposed action consists of sorting, repacking, and loading waste at the WVDP; transporting the waste for commercial treatment; and returning the residual waste to the WVDP for interim storage. For the purposes of this assessment, environmental impacts were quantified for a five-year operating period (1996 - 2001). Alternatives to the proposed action include no action, construction of additional on-site storage facilities, construction of a treatment facility at the WVDP comparable to commercial treatment, and off-site disposal at a commercial or DOE facility.

  13. Hanfords Supplemental Treatment Project: Full-Scale Integrated Testing of In-Container-Vitrification and a 10,000-Liter Dryer

    SciTech Connect (OSTI)

    Witwer, Keith S.; Dysland, Eric J.; Garfield, J. S.; Beck, T. H.; Matyas, Josef; Bagaasen, Larry M.; Cooley, Scott K.; Pierce, Eric M.; Kim, Dong-Sang; Schweiger, Michael J.

    2008-02-22

    The GeoMelt In-Container Vitrification (ICV) process was selected by the U.S. Department of Energy (DOE) in 2004 for further evaluation as the supplemental treatment technology for Hanfords low-activity waste (LAW). Also referred to as bulk vitrification, this process combines glass forming minerals, LAW, and chemical amendments; dries the mixture; and then vitrifies the material in a refractory-lined steel container. AMEC Nuclear Ltd. (AMEC) is adapting its GeoMelt ICV technology for this application with technical and analytical support from Pacific Northwest National Laboratory (PNNL). The DVBS project is funded by the DOE Office of River Protection and administered by CH2M HILL Hanford Group, Inc. The Demonstration Bulk Vitrification Project (DBVS) was initiated to engineer, construct, and operate a full-scale bulk vitrification pilot-plant to treat up to 750,000 liters of LAW from Waste Tank 241-S-109 at the DOE Hanford Site. Since the beginning of the DBVS project in 2004, testing has used laboratory, crucible-scale, and engineering-scale equipment to help establish process limitations of selected glass formulations and identify operational issues. Full-scale testing has provided critical design verification of the ICV process before operating the Hanford pilot-plant. In 2007, the projects fifth full-scale test, called FS-38D, (also known as the Integrated Dryer Melter Test, or IDMT,) was performed. This test had three primary objectives: 1) Demonstrate the simultaneous and integrated operation of the ICV melter with a 10,000-liter dryer, 2) Demonstrate the effectiveness of a new feed reformulation and change in process methodology towards reducing the production and migration of molten ionic salts (MIS), and, 3) Demonstrate that an acceptable glass product is produced under these conditions. Testing was performed from August 8 to 17, 2007. Process and analytical results demonstrated that the primary test objectives, along with a dozen supporting

  14. (SSS)Project Dashboard 2015-12-21 1000.xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Contractor Project Number Project Title Original Project Budget Project Budget Monthly Overall Assessment 1 EM Bechtel National Inc. 01-D-416 Waste Treatment and ...

  15. Mixed and low-level waste treatment project: Appendix C, Health and safety criteria for the mixed and low-level waste treatment facility at the Idaho National Engineering Laboratory. Part 1, Waste streams and treatment technologies

    SciTech Connect (OSTI)

    Neupauer, R.M.; Thurmond, S.M.

    1992-09-01

    This report describes health and safety concerns associated with the Mixed and Low-level Waste Treatment Facility at the Idaho National Engineering Laboratory. Various hazards are described such as fire, electrical, explosions, reactivity, temperature, and radiation hazards, as well as the potential for accidental spills, exposure to toxic materials, and other general safety concerns.

  16. Hanford's Supplemental Treatment Project: Full-Scale Integrated Testing of In-Container-Vitrification and a 10,000-Liter Dryer

    SciTech Connect (OSTI)

    Witwer, K.S.; Dysland, E.J.; Garfield, J.S.; Beck, T.H.; Matyas, J.; Bagaasen, L.M.; Cooley, S.K.; Pierce, E.; Kim, D.S.; Schweiger, M.J.

    2008-07-01

    The GeoMelt{sup R} In-Container Vitrification{sup TM} (ICV{sup TM}) process was selected by the U.S. Department of Energy (DOE) in 2004 for further evaluation as the supplemental treatment technology for Hanford's low-activity waste (LAW). Also referred to as 'bulk vitrification', this process combines glass forming minerals, LAW, and chemical amendments; dries the mixture; and then vitrifies the material in a refractory-lined steel container. AMEC Nuclear Ltd. (AMEC) is adapting its GeoMelt ICV{sup TM} technology for this application with technical and analytical support from Pacific Northwest National Laboratory (PNNL). The DVBS project is funded by the DOE Office of River Protection and administered by CH2M HILL Hanford Group, Inc. The Demonstration Bulk Vitrification Project (DBVS) was initiated to engineer, construct, and operate a full-scale bulk vitrification pilot-plant to treat up to 750,000 liters of LAW from Waste Tank 241-S-109 at the DOE Hanford Site. Since the beginning of the DBVS project in 2004, testing has used laboratory, crucible-scale, and engineering-scale equipment to help establish process limitations of selected glass formulations and identify operational issues. Full-scale testing has provided critical design verification of the ICV{sup TM} process before operating the Hanford pilot-plant. In 2007, the project's fifth full-scale test, called FS-38D, (also known as the Integrated Dryer Melter Test, or IDMT,) was performed. This test had three primary objectives: 1) Demonstrate the simultaneous and integrated operation of the ICV{sup TM} melter with a 10,000- liter dryer, 2) Demonstrate the effectiveness of a new feed reformulation and change in process methodology towards reducing the production and migration of molten ionic salts (MIS), and, 3) Demonstrate that an acceptable glass product is produced under these conditions. Testing was performed from August 8 to 17, 2007. Process and analytical results demonstrated that the primary test

  17. Microsoft Word - Audit Report Repost.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6:UFC 2300.00 Department of Energy Carlsbad Field Office P. O. Box 3090 Carlsbad, New Mexico 88221 July 15, 2008 Steve Zappe, Project Leader Hazardous Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Bldg. 1 Santa Fe, New Mexico 87505-6303 Subject: Transmittal of the Carlsbad Field Office Final Audit Report A-08-09 of the Advanced Mixed Waste Treatment Project Dear Mr. Zappe: This letter transmits the Advanced Mixed Waste Treatment Project (AMWTP) Audit Report for the

  18. Contract/Project Management

    Office of Environmental Management (EM)

    2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects

  19. Independent Oversight Review, Advanced Mixed Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advanced Mixed Waste Treatment Project - April 2013 Independent Oversight Review, Advanced Mixed Waste Treatment Project - April 2013 April 2013 Review of Radiation Protection...

  20. Independent Oversight Review, Sodium Bearing Waste Treatment...

    Office of Environmental Management (EM)

    Independent Oversight Review, Sodium Bearing Waste Treatment Project - Contractor - June 2012 June 2012 Review of the Sodium Bearing Waste Treatment Project - Integrated Waste ...

  1. Contract/Project Management

    Office of Environmental Management (EM)

    8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete

  2. Contract/Project Management

    Office of Environmental Management (EM)

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of

  3. Contract/Project Management

    Office of Environmental Management (EM)

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of

  4. Contract/Project Management

    Office of Environmental Management (EM)

    4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 73% This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125%

  5. Independent Oversight Activity Report, Idaho Cleanup Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Cleanup Project - November 2013 Independent Oversight Activity Report, Idaho Cleanup Project - November 2013 November 2013 Pre-restart Visit to the Integrated Waste Treatment...

  6. About Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Projects MicroBooNE Project Web Pages The Project Pages hold information and links for the collaboration and its Project Managers, and also hold links to project Director's and ...

  7. F

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    www.inl.gov Naviga&ng t he F acility M anagement Contractor C ontrac&ng W aters Idaho N a&onal L aboratory Small Business Program Stacey F rancis Small B usiness P rogram M anager DOE Small Business Conference May 10&11, 2011 Idaho National Laboratory Prime Contractors * Idaho National Laboratory - Managed and Operated by Battelle Energy Alliance, LLC * Idaho Cleanup Project - Managed by CH2M-WG Idaho, LLC * Advanced Mixed Waste Treatment Project (AMWTP) Managed and Operated by

  8. ORP Projects & Facilities - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facilities Office of River Protection About ORP ORP Projects & Facilities Tank Farms Waste Treatment & Immobilization Plant 222-S Laboratory 242-A Evaporator Newsroom Contracts &...

  9. Microwave solidification project overview

    SciTech Connect (OSTI)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included.

  10. Engineers Go Mobile with Tablets, Bring Benefits to Waste Treatment...

    Energy Savers [EERE]

    Engineers Go Mobile with Tablets, Bring Benefits to Waste Treatment Plant Project Engineers Go Mobile with Tablets, Bring Benefits to Waste Treatment Plant Project June 15, 2016 - ...

  11. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    SciTech Connect (OSTI)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    2013-07-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

  12. Waste Treatment And Immobilization Plant U. S. Department Of Energy Office Of River Protection Submerged Bed Scrubber Condensate Disposition Project - Abstract # 13460

    SciTech Connect (OSTI)

    Yanochko, Ronald M; Corcoran, Connie

    2012-11-15

    The Hanford Waste Treatment and Immobilization Plant (WTP) will generate an off-gas treatment system secondary liquid waste stream [submerged bed scrubber (SBS) condensate], which is currently planned for recycle back to the WTP Low Activity Waste (LAW) melter. This SBS condensate waste stream is high in Tc-99, which is not efficiently captured in the vitrified glass matrix. A pre-conceptual engineering study was prepared in fiscal year 2012 to evaluate alternate flow paths for melter off-gas secondary liquid waste generated by the WTP LAW facility. This study evaluated alternatives for direct off-site disposal of this SBS without pre-treatment, which mitigates potential issues associated with recycling.

  13. Mixed and low-level waste treatment project: Appendix C, Health and safety criteria for the mixed and low-level waste treatment facility at the Idaho National Engineering Laboratory

    SciTech Connect (OSTI)

    Neupauer, R.M.; Thurmond, S.M.

    1992-09-01

    This report describes health and safety concerns associated with the Mixed and Low-level Waste Treatment Facility at the Idaho National Engineering Laboratory. Various hazards are described such as fire, electrical, explosions, reactivity, temperature, and radiation hazards, as well as the potential for accidental spills, exposure to toxic materials, and other general safety concerns.

  14. Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

    SciTech Connect (OSTI)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    2012-11-14

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.

  15. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LaboratoryNational Security Education Center Menu NSEC Educational Programs Los Alamos Dynamics Summer School Science of Signatures Advanced Studies Institute Judicial Science School SHM Data Sets and Software Research Projects Current Projects Past Projects Publications NSEC » Engineering Institute » Research Projects » Joint Los Alamos National Laboratory/UCSD research projects Past Research Projects Previous collaborations between Los Alamos National Laboratory and the University of

  16. Project Accounts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Accounts Project Accounts A redirector page has been set up without anywhere to redirect to. Last edited: 2016-04-29 11:34:50

  17. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Research Projects Joint Los Alamos National LaboratoryUCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San...

  18. Project Gnome

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Gnome Double Beta Decay Dark Matter Biology Repository Science Renewable Energy The first underground physics experiment near Carlsbad was Project Gnome, December 10, 1961 ...

  19. Waste Treatment and Immobilization Plant U. S. Department of Energy Office of River Protection Submerged Bed Scrubber Condensate Disposition Project - 13460

    SciTech Connect (OSTI)

    Yanochko, Ronald M. [Washington River Protection Solutions, P.O. Box 850, Richland, Washington 99352 (United States)] [Washington River Protection Solutions, P.O. Box 850, Richland, Washington 99352 (United States); Corcoran, Connie [AEM Consulting, LLC, 1201 Jadwin Avenue, Richland, Washington 99352 (United States)] [AEM Consulting, LLC, 1201 Jadwin Avenue, Richland, Washington 99352 (United States)

    2013-07-01

    The Hanford Waste Treatment and Immobilization Plant (WTP) will generate an off-gas treatment system secondary liquid waste stream [submerged bed scrubber (SBS) condensate], which is currently planned for recycle back to the WTP Low Activity Waste (LAW) melter. This SBS condensate waste stream is high in Tc-99, which is not efficiently captured in the vitrified glass matrix [1]. A pre-conceptual engineering study was prepared in fiscal year 2012 to evaluate alternate flow paths for melter off-gas secondary liquid waste generated by the WTP LAW facility [2]. This study evaluated alternatives for direct off-site disposal of this SBS without pre-treatment, which mitigates potential issues associated with recycling. This study [2] concluded that SBS direct disposal is a viable option to the WTP baseline. The results show: - Off-site transportation and disposal of the SBS condensate is achievable and cost effective. - Reduction of approximately 4,325 vitrified WTP Low Activity Waste canisters could be realized. - Positive WTP operational impacts; minimal WTP construction impacts are realized. - Reduction of mass flow from the LAW Facility to the Pretreatment Facility by 66%. - Improved Double Shell Tank (DST) space management is a benefit. (authors)

  20. Environmental Assessment and Finding of No Significant Impact: Wastewater Treatment Capability Upgrade, Project NO. 96-D-122 Pantex Plant Amarillo, Texas

    SciTech Connect (OSTI)

    N /A

    1999-05-27

    This Environmental Assessment (EA) addresses the U.S. Department of Energy (DOE) proposed action regarding an upgrade of the Pantex Plant Wastewater Treatment Facility (WWTF). Potential environmental consequences associated with the proposed action and alternative actions are provided. DOE proposes to design, build, and operate a new WWTF, consistent with the requirements of Title 30 of the Texas Administrative Code (TAC), Chapter 317, ''Design Criteria for Sewage Systems,'' capable of supporting current and future wastewater treatment requirements of the Plant. Wastewater treatment at Pantex must provide sufficient operational flexibility to meet Pantex Plant's anticipated future needs, including potential Plant mission changes, alternative effluent uses, and wastewater discharge permit requirements. Treated wastewater effluent and non-regulated water maybe used for irrigation on DOE-owned agricultural land. Five factors support the need for DOE action: (1) The current WWTF operation has the potential for inconsistent permit compliance. (2) The existing WWTF lies completely within the 100-year floodplain. (3) The Pantex Plant mission has the potential to change, requiring infrastructure changes to the facility. (4) The life expectancy of the existing facility would be nearing its end by the time a new facility is constructed. (5) The treated wastewater effluent and non-regulated water would have a beneficial agricultural use through irrigation. Evaluation during the internal scoping led to the conclusion that the following factors are present and of concern at the proposed action site on Pantex Plant: (1) Periodic wastewater effluent permit exceedances; (2) Wetlands protection and floodplain management; (3) Capability of the existing facility to meet anticipated future needs of Pantex (4) Existing facility design life; and (5) Use of treated wastewater effluent and non-regulated water for irrigation. Evaluation during the internal scoping led to the conclusion

  1. Independent Oversight Review, Sodium Bearing Waste Treatment...

    Office of Environmental Management (EM)

    This report documents the results of an independent review of the Sodium Bearing Waste Treatment Project-Integrated Waste Treatment Unit Federal Operational Readiness Review. ...

  2. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight Review, Waste Treatment and Immobilization Plant - March 2012 March 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Project ...

  3. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    Independent Oversight Review, Waste Treatment and Immobilization Plant Project - October 2010 October 2010 Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and ...

  4. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  5. Project Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Information Slider award map The REE Program funds projects focused on developing economically feasible and environmentally benign technologies for recovering REEs from coal and/or coal by-products. Project Information The listed projects represent the current REE program portfolio. Agreement Number Project Title Performer Name FWP-RIC REE FY2016-2020 Rare Earth Elements (REE) from Coal and Coal By-Products National Energy Technology Laboratory FE0027167 High Yield and Economical

  6. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility

    SciTech Connect (OSTI)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    2013-01-11

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.

  7. Voluntary Protection Program Onsite Review, Idaho Treatment Group...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Treatment Group, Llc, Advanced Mixed Waste Treatment Project - June 2014 Voluntary Protection Program Onsite Review, Idaho Treatment Group, Llc, Advanced Mixed Waste ...

  8. Tulalip Tribe - Biogas Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bio-Gas Project Daryl Williams November 18, 2008 Introduction Background Description of Project Partnership Feasibility Study/Business Plan Creation of Quil Ceda Power Funding Creation of Qualco Energy Closing Background Land-Use Changes from Agriculture to Other Types of Development Skykomish River WQ Problems Bacteria Nutrient Loading Relationship Between Tribes and Dairies Poor Economy for Dairy Operations Project Description Sewage Treatment for

  9. Medical Actinium Therapeutic Treatment

    ScienceCinema (OSTI)

    None

    2013-05-28

    Learn how INL researchers are increasing world supplies of Bismuth 213 to help with cancer treatments. For more information about INL research projects, visit http://www.facebook.com/idahonationallaboratory.

  10. Colombia-World Bank Climate Projects | Open Energy Information

    Open Energy Info (EERE)

    Offset Project "The Colombia Rio Frio Carbon Offset Project aims to reduce greenhouse gas emissions fro the wastewater treatment sector in Colombia by modernizing the Rio Frio...

  11. MAJOR CONFORMED CONTRACTS LINKS Site/Project Contract Link Idaho

    Office of Environmental Management (EM)

    MAJOR CONFORMED CONTRACTS LINKS SiteProject Contract Link Idaho Idaho Cleanup Project http:www.id.doe.govdoeidICPContractICPContract.htm Advance Mixed Waste Treatment http:...

  12. Line Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission System Upgrade Project - M2W Olympia-Grand Coulee No. 1...

  13. Project Benefits

    Broader source: Energy.gov [DOE]

    Benefits of the Guidelines for Home Energy Professionals project including reducing energy upgrade costs for consumers, employers, and program administrators.

  14. Hydropower Projects

    Broader source: Energy.gov [DOE]

    This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

  15. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  16. PROJECT REPORTS FOR Alaska Native Tribal Health Consortium- 2011 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The main objective of the proposed project is to improve the overall energy efficiency of the water treatment/distribution and sewer collection systems in Selawik by implementing the retrofit measures identified in a previously conducted utility energy audit.

  17. Project Reports for Alaska Native Tribal Health Consortium- 2011 Project

    Broader source: Energy.gov [DOE]

    The main objective of the proposed project is to improve the overall energy efficiency of the water treatment/distribution and sewer collection systems in Selawik by implementing the retrofit measures identified in a previously conducted utility energy audit.

  18. TRU waste inventory collection and work-off plans for the centralization of TRU waste characterization at INL - on your mark - get set - 9410

    SciTech Connect (OSTI)

    Mctaggert, Jerri Lynne; Lott, Sheila; Gadbury, Casey

    2009-01-01

    The U.S. Department of Energy (DOE) amended the Record of Decision (ROD) for the Waste Management Program: Treatment and Storage ofTransuranic Waste to centralize transuranic (TRU) waste characterization/certification from fourteen TRU waste sites. This centralization will allow for treatment, characterization and certification ofTRU waste from the fourteen sites, thirteen of which are sites with small quantities ofTRU waste, at the Idaho National Laboratory (INL) prior to shipping the waste to the Waste Isolation Pilot Plant (WIPP) for disposal. Centralization ofthis TRU waste will avoid the cost ofbuilding treatment, characterization, certification, and shipping capabilities at each ofthe small quantity sites that currently do not have existing facilities. Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Nuclear Technology and Engineering Center (INTEC) will provide centralized shipping facilities, to WIPP, for all ofthe small quantity sites. Hanford, the one large quantity site identified in the ROD, has a large number ofwaste in containers that are overpacked into larger containers which are inefficient for shipment to and disposal at WIPP. The AMWTP at the INL will reduce the volume ofmuch of the CH waste and make it much more efficient to ship and dispose of at WIPP. In addition, the INTEC has a certified remote handled (RH) TRU waste characterization/certification program at INL to disposition TRU waste from the sites identified in the ROD.

  19. Project Tour

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Tour Project Tour See NMSSUP from the ground NMSSUP Phase II Construction Project Tour Transportation Transportation to the tour will be provided from Hilton Santa Fe Buffalo Thunder to Los Alamos National Laboratory, Technical Area 55. After the tour, transportation will be provided back to Hilton Santa Fe Buffalo Thunder. What to wear Wear comfortable pants and leather shoes (flat, comfortable, closed-toe; no tennis shoes or high heels). Schedule There will be a one-hour, no-host lunch

  20. project management

    National Nuclear Security Administration (NNSA)

    3%2A en Project Management and Systems Support http:www.nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  1. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    structure whose behavior is fundamentally nonlinear. Thus, the students assigned to this project will develop control techniques that will allow an electrodynamic shake table to...

  2. project management

    National Nuclear Security Administration (NNSA)

    %2A en Project Management and Systems Support http:nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  3. Custom Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Management Small Industrial Lighting Compressed Air ESUE Motors Federal Agriculture Custom Projects No two industrial customers are alike; each has its own unique...

  4. Project Complete

    Broader source: Energy.gov [DOE]

    DOE has published its Record of Decision announcing and explaining DOE’s chosen project alternative and describing any commitments for mitigating potential environmental impacts. The NEPA process...

  5. Project Construction

    Office of Energy Efficiency and Renewable Energy (EERE)

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  6. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment Collaboration between Los Alamos National Laboratory and the University of California at San ...

  7. Review of Nuclear Safety Culture at the Hanford Site Waste Treatment...

    Energy Savers [EERE]

    Treatment and Immobilization Plant Project, October 2010 Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and Immobilization Plant Project, October 2010 October ...

  8. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    30, 2009 U.S. Department of Energy Doc. No. S05572 July 2009 Page 2 1.4 Temporary Storage Facility (TSF) * ... Situ Groundwater Treatment System * The ex situ treatment ...

  9. Awarded projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    projects Awarded projects 2016 Allocation Awards This page lists the allocation awards for NERSC for the 2016 allocation year (Jan 12, 2016 through Jan 09, 2017). Read More » Previous Year Awards Last edited: 2016-04-29 11:35:1

  10. Idaho Site Contractor Achieves Treatment Project Milestone

    Broader source: Energy.gov [DOE]

    IDAHO FALLS, Idaho – The Idaho site’s main cleanup contractor recently achieved a major performance milestone by successfully passing an operational readiness review for a first-of-a-kind facility that will treat the remaining 900,000 gallons of liquid radioactive waste generated by the site’s legacy cleanup mission.

  11. INL Bettis Water Treatment Project Report

    SciTech Connect (OSTI)

    Not Available

    2009-06-01

    Bechtel Bettis Atomic Power Laboratory (Bettis), West Mifflin, PA, requested that the Idaho National Laboratory (INL) (Battelle Energy Alliance) perform tests using water simulants and three specified media to determine if those ion-exchange (IX) resins will be effective at removing the plutonium contamination from water. This report details the testing and results of the tests to determine the suitability of the media to treat plutonium contaminated water at near nuetral pH.

  12. K Basins Sludge Treatment Project Phase 1

    Office of Environmental Management (EM)

    Michael Poirier Art W. Etchells Gary Smith Kris Thomas Jim J. Davis Paul Macbeth ... Arthur W. Etchells, Team Member Date Gary Smith, Team Member Date Kris Thomas, Team Member ...

  13. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  14. Enterprise Assessments Review of the Hanford Site Waste Treatment...

    Energy Savers [EERE]

    Plant Project Engineering Processes - October 2015 October 2015 Review of Engineering Processes at the Hanford Site Waste Treatment and Immobilization Plant Project The ...

  15. RENOTER Project

    Broader source: Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  16. Project 1027697

    Office of Scientific and Technical Information (OSTI)

    William Apel and Frank Roberto at) the Biotechnology Department at the INEEL. Each part of this project is funded under a different contract with the Science Division of the US ...

  17. EGS Projects

    Broader source: Energy.gov [DOE]

    EGS projects span research, development, and demonstration. Unlike traditional hydrothermal systems, EGS capture heat from areas that traditional geothermal energy cannot—where fluid and/or...

  18. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    This page intentionally left blank U.S. Department of Energy ... 3.1.2 Temporary Storage Facility ... Situ Groundwater Treatment System ......

  19. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    blank U.S. Department of Energy Monticello NPL Sites FFA ... 3.1.2 Temporary Storage Facility ... Situ Groundwater Treatment System ......

  20. MONTICELLO PROJECTS

    Office of Legacy Management (LM)

    blank U.S. Department of Energy Monticello NPL Sites FFA ... 3.1.2 Temporary Storage Facility ... Tables Table 1. Treatment System Compliance Summary ...

  1. PROJECT INFORMATION

    Office of Scientific and Technical Information (OSTI)

    at a municipal wastewater treatment plant (WWTP); To develop a business case or ... released from the process tank during transfers; leading to complaints from plant staff. ...

  2. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Projects Joint Los Alamos National Laboratory/UCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Jutta Kayser (505) 663-5649 Email Administrative Assistant Stacy Baker (505) 663-5233 Email "Since 2003, LANL has funded numerous collaborative

  3. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Projects » Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment Collaboration between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email UCSD Faculty and Graduate

  4. PGDP Deactivation Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GDP Transition » PGDP Deactivation Project PGDP Deactivation Project PGDP Deactivation Project scope major activities: Site Optimization Studies include: - Steam, Air, Nitrogen and Chilled Water Optimization Study - Water Treatment Facility Optimization Study - C-100 Optimization Study - Sewer Evaluation Study Facility Stabilization Preparation and/or removal of nuclear materials and contaminants from facilities. Stabilization activities are performed during early stages of facility

  5. DOE Project Scorecards

    Broader source: Energy.gov [DOE]

    DOE Project Scorecards DOEproject scorecards summarize capital asset project performance compared to the current approved baseline.

  6. DOE Project Scorecards

    Broader source: Energy.gov [DOE]

    DOE Project Scorecards DOE project scorecards summarize capital asset project performance compared to the current approved baseline. 

  7. Cloudnet Project

    SciTech Connect (OSTI)

    Hogan, Robin

    2008-01-15

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  8. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  9. Independent Oversight Review, Waste Treatment and Immobilization Plant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project - October 2010 | Department of Energy Project - October 2010 Independent Oversight Review, Waste Treatment and Immobilization Plant Project - October 2010 October 2010 Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and Immobilization Plant Project The U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS) conducted an independent review of the nuclear safety culture at the Waste Treatment and Immobilization Plant (WTP) project at the Hanford

  10. Process Knowledge Summary Report for Advanced Test Reactor Complex Contact-Handled Transuranic Waste Drum TRA010029

    SciTech Connect (OSTI)

    B. R. Adams; R. P. Grant; P. R. Smith; J. L. Weisgerber

    2013-09-01

    This Process Knowledge Summary Report summarizes information collected to satisfy the transportation and waste acceptance requirements for the transfer of one drum containing contact-handled transuranic (TRU) actinide standards generated by the Idaho National Laboratory at the Advanced Test Reactor (ATR) Complex to the Advanced Mixed Waste Treatment Project (AMWTP) for storage and subsequent shipment to the Waste Isolation Pilot Plant for final disposal. The drum (i.e., Integrated Waste Tracking System Bar Code Number TRA010029) is currently stored at the Materials and Fuels Complex. The information collected includes documentation that addresses the requirements for AMWTP and applicable sections of their Resource Conservation and Recovery Act permits for receipt and disposal of this TRU waste generated from ATR. This Process Knowledge Summary Report includes information regarding, but not limited to, the generation process, the physical form, radiological characteristics, and chemical contaminants of the TRU waste, prohibited items, and packaging configuration. This report, along with the referenced supporting documents, will create a defensible and auditable record for this TRU waste originating from ATR.