Powered by Deep Web Technologies
Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

FRN Request for Proposals for New or Upgraded Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 AGENCY:...

2

Request for Proposals for New or Upgraded Transmission Line Projects...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012...

3

A Guide for Transmission Line Voltage Upgrade  

Science Conference Proceedings (OSTI)

In the last few decades, construction of new transmission facilities has not caught up with the demand for electric power. The problem of transmission capacity shortage was further compounded by deregulation of the power industry, which allows power to be dispatched from any generation source for the lowest energy cost. As a result, lines that were not planned for these power flows may now be overloaded. A number of bottlenecks were thus created, restricting power transfer from one location to another. U...

2008-12-09T23:59:59.000Z

4

MCP Upgrade: Transmission Line and Pore Importance  

E-Print Network (OSTI)

In order to take advantage of all of the benefits of Multi-Channel Plate Photo-Multiplier Tubes (MCPs) a fast and efficient readout scheme must be implemented. One scheme that appears very promising is that of a transmission line coupled to a digital sampling readout. Transmission line readout allows for 2D position reconstruction, as well as an extremely fast response time, allowing for an exceptional timing resolution. I will be discussing the development of a method to connect the transmission line readout to the anode of the MCP, as well as testing the resultant MCP-transmission line readout system. This testing occurred at Argonnes laser lab, which featured a tunable fast rise time laser as well as a data acquisition system with a low noise level. A study to determine the importance of the pore size of the MCP was also carried out at Argonnes laser lab. In this study two MCPs which differed only in pore size (25µm and 10µm) were tested and their timing resolutions were compared. The objective of the following discussion is to quantify the effectiveness of the transmission line readout, learn more about the nature of the MCP and its signals, and look for ways in which to improve upon the present readout technique. 2 Tyler Natoli 1

Tyler Natoli; Advisor Henry Frisch

2009-01-01T23:59:59.000Z

5

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Montana-to-Washington Transmission System Upgrade Project 4: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana SUMMARY This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations. The project website is http://efw.bpa.gov/environmental_services/Document_Library/M2W/. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVALABLE FOR DOWNLOAD May 3, 2012 EIS-0484: Notice of Intent to Prepare an Environmental Impact Statement

6

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana  

Energy.gov (U.S. Department of Energy (DOE))

This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations.

7

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

8

Electricity Transmission Data Needs Focus Group Results  

U.S. Energy Information Administration (EIA)

power, transmission flows within states, the implications of transmission on capacity expansion decisions and costs; age of transformers and other facilities;

9

Electricity Transmission in a Restructured Industry: Data Needs ...  

U.S. Energy Information Administration (EIA)

Electricity Transmission in a Restructured Industry: ... as is now happening in the electricity industry, alters the basic data needed to describe that industry.

10

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

11

Electricity Transmission in a Restructured Industry: Data Needs...  

NLE Websites -- All DOE Office Websites (Extended Search)

Electricity Transmission in a Restructured Industry: Data Needs for Public Policy Analysis Speaker(s): Douglas Hale Date: February 24, 2005 - 12:00pm Location: Bldg. 90 Seminar...

12

Power upgrading of transmission line by combining AC-DC transmission  

Science Conference Proceedings (OSTI)

Long extra high voltage (EHV) ac lines cannot be loaded to their thermal limits in order to keep sufficient margin against transient instability. With the scheme proposed in this project, it is possible to load these lines very close to their thermal ... Keywords: extra high voltage (EHV)transmission, flexible ac transmission system (FACTS), power system computer-aided design(PSCAD), simultaneous ac-dc power transmission

Jarupula Somlal

2010-07-01T23:59:59.000Z

13

Potential impacts of nanotechnology on energy transmission applications and needs.  

SciTech Connect

The application of nanotechnologies to energy transmission has the potential to significantly impact both the deployed transmission technologies and the need for additional development. This could be a factor in assessing environmental impacts of right-of-way (ROW) development and use. For example, some nanotechnology applications may produce materials (e.g., cables) that are much stronger per unit volume than existing materials, enabling reduced footprints for construction and maintenance of electricity transmission lines. Other applications, such as more efficient lighting, lighter-weight materials for vehicle construction, and smaller batteries having greater storage capacities may reduce the need for long-distance transport of energy, and possibly reduce the need for extensive future ROW development and many attendant environmental impacts. This report introduces the field of nanotechnology, describes some of the ways in which processes and products developed with or incorporating nanomaterials differ from traditional processes and products, and identifies some examples of how nanotechnology may be used to reduce potential ROW impacts. Potential environmental, safety, and health impacts are also discussed.

Elcock, D.; Environmental Science Division

2007-11-30T23:59:59.000Z

14

Design and Analyses of Transmission Lines for the 110 GHzECH Upgrade to 6 MW for DIII-D  

SciTech Connect

During the summer of 1999 the installation of three new Electron Cyclotron Heating (ECH) transmission lines began as part of the 110 GHz ECH Upgrade to 6 MW project for DIII-D. An important step in the development of the transmission line design was the selection of the waveguide size. To make this selection, analyses were conducted to characterize the thermal and radio frequency (rf) loss performance of the key corrugated waveguide components under 1 MW, long pulse (10 s, 1% duty cycle) operation. Other factors that were analyzed included vacuum conductance and pumping speed, ease of installation, space considerations, and overall cost. The two candidate transmission line sizes were 2.50 in. and 1.25 in. id. An overview of the design and layout of the proposed transmission lines for the DIII-D ECH upgrade project is presented. Details and results are given for the vacuum conductance analysis of the overall transmission line, the rf loss analyses and tests on corrugated waveguide and miter bends, and the thermal analyses of the mirrors in the corrugated waveguide switch and the power monitor miter bend. Finally, a discussion is presented which weighs the results of these analyses with the experience gained through the installation and operation of the existing three 1 MW ECH systems at DIII-D and concludes with the selection of 1.25 in. i.d. waveguide and components for the upgrade project.

Grunloh, H.J.; Baxi, C.B.; Chin, E.; Condon, M.; Doane, J.L.; Moeller, C.P.; O'Neill, R.C.

1999-11-01T23:59:59.000Z

15

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

16

Transmission needs across a fully renewable European power system  

E-Print Network (OSTI)

The residual load and excess power generation of 27 European countries with a 100% penetration of variable renewable energy sources are explored in order to quantify the benefit of power transmission between countries. Estimates are based on extensive weather data, which allows for modelling of hourly mismatches between the demand and renewable generation from wind and solar photovoltaics. For separated countries, balancing is required to cover around 24% of the total annual energy consumption. This number can be reduced down to 15% once all countries are networked together with uncon- strained interconnectors. The reduction represents the maximum possible benefit of transmission for the countries. The total Net Transfer Capacity of the unconstrained interconnectors is roughly twelve times larger than current values. However, constrained interconnector capacities six times larger than the current values are found to provide 97% of the maximum possible benefit of cooperation. This motivates a detailed investig...

Rodriguez, Rolando A; Andresen, Gorm B; Heide, Dominik; Greiner, Martin

2013-01-01T23:59:59.000Z

17

Thoughts on Data and TTC Transmission for the Upgraded ATLAS Inner Detector Alex Grillo  

E-Print Network (OSTI)

not increase power over electrical readout. d. Provide a mechanism whereby a failed IC will not kill a much a dead chip should be employed. #12;e. In order to minimize electrical noise, all electrical. Something roughly matching the LVDS standard was adopted. 2. Transmission data rates and multiplexing

California at Santa Cruz, University of

18

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROPOSAL PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge ....................................................................................................................................... 1 2. The Solution .......................................................................................................................................... 1 SECTION I: STATUTORY CRITERIA 1. General Description of the Entity ................................................................................................... 4 2. Project Description ............................................................................................................................. 5

19

The Need for an R&D and Upgrade Program for CMS Software and Computing  

E-Print Network (OSTI)

Over the next ten years, the physics reach of the Large Hadron Collider (LHC) at the European Organization for Nuclear Research (CERN) will be greatly extended through increases in the instantaneous luminosity of the accelerator and large increases in the amount of collected data. Due to changes in the way Moore's Law computing performance gains have been realized in the past decade, an aggressive program of R&D is needed to ensure that the computing capability of CMS will be up to the task of collecting and analyzing this data.

Peter Elmer; Salvatore Rappoccio; Kevin Stenson; Peter Wittich

2013-08-06T23:59:59.000Z

20

Abstract--Under the need for anticipatory efficient investment in transmission, several problems arise at the regulation and  

E-Print Network (OSTI)

electricity market. Index Terms--Transmission planning, transmission investment, regulation, additional lines1 Abstract--Under the need for anticipatory efficient investment in transmission, several problems transmission investments that existing generation and demand may be not willing to pay. This problem

Rudnick, Hugh

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

22

Transmission Valuation and Cost Recovery  

Science Conference Proceedings (OSTI)

This technical update provides information on the status of the electric power industry regarding the economic valuation of transmission projects. Such valuations became critical with the introduction of economic transmission projects in the context of competitive electricity markets. Economic valuation is also becoming increasingly important for traditional reliability upgrades, because of the need for consistency in cost allocations between the two types of upgrades. The year 2005 has brought significa...

2005-12-22T23:59:59.000Z

23

Large Distributed Energy Resource Options to Alleviate Transmission Constraints  

Science Conference Proceedings (OSTI)

Utility transmission systems require extensive investment for infrastructure upkeep. In addition, load growth requires upgrades to guard against overloading or loss of load. In some situations, an investment in a traditional transmission system upgrade may not be the most economic option. It may be possible to defer the need for an upgrade using distributed energy resources (DER), and in doing so, reduce the economic impact to the utility and its ratepayers. Additional considerations, such as impact on s...

2006-02-15T23:59:59.000Z

24

Electric utility transmission and distribution upgrade deferral benefits from modular electricity storage : a study for the DOE Energy Storage Systems Program.  

DOE Green Energy (OSTI)

The work documented in this report was undertaken as part of an ongoing investigation of innovative and potentially attractive value propositions for electricity storage by the United States Department of Energy (DOE) and Sandia National Laboratories (SNL) Electricity Storage Systems (ESS) Program. This study characterizes one especially attractive value proposition for modular electricity storage (MES): electric utility transmission and distribution (T&D) upgrade deferral. The T&D deferral benefit is characterized in detail. Also presented is a generalized framework for estimating the benefit. Other important and complementary (to T&D deferral) elements of possible value propositions involving MES are also characterized.

Eyer, James M. (Distributed Utility Associates, Inc., Livermore, CA)

2009-06-01T23:59:59.000Z

25

DOE EAC Electricity Adequacy Report. Transmission Section - September 15,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Section - Transmission Section - September 15, 2008 DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 There is a critical need to upgrade the nation's electric transmission grid. Two reasons in particular drive this need. First, increasing transmission capability will help ensure a reliable electric supply and provide greater access to economically-priced power. Second, with the growth in state-adopted renewable performance standards (RPS) and the increasing possibility of a national RPS, significant new transmission, much of it interregional, is needed to access renewable resources. DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 More Documents & Publications DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT-

26

EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 34-mile Midway-Moxee transmission line in Benton and Yakima Counties, Washington.

27

Current trends in transmission system planning needed in competitive and deregulated environment using artificial intelligence  

Science Conference Proceedings (OSTI)

This paper picturesquely depicts the changing trends and values under new circumstances which are developed in the sector of electric power system i.e. generation side and partly on the way in transmission and distribution network. A very clear advocacy ... Keywords: competitive, congestion, deregulation, market dynamic, monitoring, restructuring

Aamir Mahboob Ilahi; Suhail Aftab Qureshi

2006-05-01T23:59:59.000Z

28

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

29

Electric Transmission and Distribution Future R&D Needs Planning, Operation, Control, and Visualization  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27-28, 2013 27-28, 2013 Washington, DC FY13 DOE/CERTS Transmission Reliability R&D Internal Program Review Research Projects Reliability Standards Analysis and Assessments  Frequency Response Event Collection and Analysis  NERC Interconnections 2012 Annual Grid Reliability Performance Analysis and Report Page 1 Reliability Standards Analysis and Assessment  Objective: Collect grid data and conduct grid reliability performance analysis to support the NERC committees/groups (Resources Subcommittee and RS- Frequency Working Group) in the following ways: - Perform grid reliability metrics analysis using data collected in CERTS applications as requested by the RS - Analyze collected data to assess reliability performance at different levels - Interconnection, Reliability Coordinator, Balancing Authority

30

EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmissio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade...

31

Midwest Transmission Workshop I Summary  

SciTech Connect

OAK-B135 The meeting was opened with a review of the purposes of the workshop: (1) Present and discuss key studies and assessments of transmission upgrades, additions and related issues for the upper Midwest, including work that addresses the full range of views on these topics; (2) Understand the various transmission issues in the upper Midwest and discuss options for addressing the issues; and (3) Identify the decision makers and entities that need to play an active role if transmission issues are to be resolved, and agree on next steps for engaging these individuals and organizations through education, outreach, and information dissemination.

Kevin Bryan

2001-05-01T23:59:59.000Z

32

Transmission Lines and Property Values: State of the Science  

Science Conference Proceedings (OSTI)

Growing energy demand and an aging electricity infrastructure underscore the need for new and upgraded transmission lines. Despite system failures and seasonal symptoms such as rolling brownouts, efforts to expand or improve transmission systems invariably meet with strong opposition. A primary source of this opposition comes from landowners who feel that the presence of a nearby transmission line may cause their property to decrease in value. A significant factor contributing to the contentious nature o...

2003-11-24T23:59:59.000Z

33

Updating the Electric Grid: An Introduction to Non-Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Updating the Electric Grid: An Introduction to Non-Transmission Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Throughout the United States a consensus has emerged that an improved transmission system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance barriers which delay implementation of needed transmission improvements. As State decision makers consider transmission investments, it may be important to account for Non-Transmission Alternatives (NTA). NTAs are programs and technologies that complement and improve operation of existing transmission systems that individually or in combination defer or eliminate the need for upgrades to

34

Updating the Electric Grid: An Introduction to Non-Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Updating the Electric Grid: An Introduction to Non-Transmission Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Throughout the United States a consensus has emerged that an improved transmission system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance barriers which delay implementation of needed transmission improvements. As State decision makers consider transmission investments, it may be important to account for Non-Transmission Alternatives (NTA). NTAs are programs and technologies that complement and improve operation of existing transmission systems that individually or in combination defer or eliminate the need for upgrades to

35

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge...

36

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

37

NSLS control system upgrade status  

SciTech Connect

The NSLS control system initially installed in 1978 has undergone several modifications but the basic system architecture remained relatively unchanged. The need for faster response, increased reliability and better diagnostics made the control system upgrade a priority. Since the NSLS runs continuously, major changes to the control system are difficult. The upgrade plan had to allow continuous incremental changes to the control system without having any detrimental effect on operations. The plan had to provide for immediate improvement in a few key areas, such as data access rates, and be complete in a short time. At present, most accelerator operations utilize the upgraded control system.

Smith, J.; Ramamoorthy, S.; Tang, Y.; Flannigan, J.; Sathe, S.; Keane, J.; Krinsky, S.

1993-07-01T23:59:59.000Z

38

Transmission Loss Reduction Derived from the Use of Trapezoidal Conductors  

Science Conference Proceedings (OSTI)

The New York State Transmission Assessment and Reliability Study Working Group, in coordination with the New York Independent System Operator (NYISO), has developed an Age-Based In-Kind Replacement plan of aging infrastructure and other low-cost upgrades necessary to maintain existing thermal capability levels and meet reliability needs. The plan includes the refurbishment of several hundred miles of transmission lines across the NYISO footprint and assumes that conventional aluminum conductor, ...

2012-11-15T23:59:59.000Z

39

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

cable transmission systems:5 two 500 kV circuits, a high-voltage direct current (HVDC) system and two to serve VI and the HVDC link is expected to be completely retired in 2007. This erosion in transmission / replacement of the HVDC cables (at a cost of $230 million), as well as transmission upgrades on the mainland

40

Recharge Elec. Upgrade Type  

E-Print Network (OSTI)

battery can be plugged in to an electric outlet to be recharged. Background: PHEVs 1. How many U" cost) · Variety of upgrade packages selected--some with zero upgrades · Most popular upgrade" Price Scenario ("home recharges" only) · "Base" PHEV=$3,000 premium · Added costs for upgrades (Full

California at Davis, University of

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Scoping Study for Identifying the Need for New Tools for the Planning of Transmission and Distribution Systems  

Science Conference Proceedings (OSTI)

This scoping study was performed for the Intelligrid program and presents a qualitative analysis of the industry with respect to transmission and distribution planning. The aim of the Intelligrid program is to create the technical foundation for a smart power grid that links electricity with communications and computer control to achieve tremendous gains in reliability, capacity, and customer services. This study assesses the capabilities of tools currently used towards this system enhancement, identifie...

2007-06-28T23:59:59.000Z

42

System Upgrade  

NLE Websites -- All DOE Office Websites (Extended Search)

check this hotnews again for updates. If you need data before we are operational again, please call our User Services Office at 423-241-3952 or e-mail us at ornldaac@ornl.gov....

43

Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.  

DOE Green Energy (OSTI)

This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.

Eyer, James M. (Distributed Utility Associates, Livermore, CA); Butler, Paul Charles; Iannucci, Joseph J., Jr. (,.Distributed Utility Associates, Livermore, CA)

2005-11-01T23:59:59.000Z

44

Energy Efficiency Upgrades  

Science Conference Proceedings (OSTI)

The energy efficiency upgrades project at Hardin County General Hospital did not include research nor was it a demonstration project. The project enabled the hospital to replace outdated systems with modern efficient models. Hardin County General Hospital is a 501c3, nonprofit hospital and the sole community provider for Hardin and Pope Counties of Illinois. This project provided much needed equipment and facility upgrades that would not have been possible through locally generated funding. Task 1 was a reroofing of the hospital. The hospital architect designed the replacement to increase the energy efficiency of the hospital roof/ceiling structure. Task 2 was replacement and installation of a new more efficient CT scanner for the hospital. Included in the project was replacement of HVAC equipment for the entire radiological suite. Task 5 was a replacement and installation of a new higher capacity diesel-fueled emergency generator for the hospital replacing a 50+ year old gas-fired generator. Task 7 was the replacement of 50+ year-old walk-in cooler/freezer with a newer, energy efficient model. Task 8 was the replacement of 10+ year-old washing machines in the hospital laundry with higher capacity, energy efficient models. Task 9 was replacement of 50-year old single pane curtain window system with double-pane insulated windows. Additionally, insulation was added around ventilation systems and the curtain wall system.

Roby Williams

2012-03-29T23:59:59.000Z

45

Power Electronics for Distributed Energy Systems and Transmission and Distribution Applications: Assessing the Technical Needs for Utility Applications  

DOE Green Energy (OSTI)

Power electronics can provide utilities the ability to more effectively deliver power to their customers while providing increased reliability to the bulk power system. In general, power electronics is the process of using semiconductor switching devices to control and convert electrical power flow from one form to another to meet a specific need. These conversion techniques have revolutionized modern life by streamlining manufacturing processes, increasing product efficiencies, and increasing the quality of life by enhancing many modern conveniences such as computers, and they can help to improve the delivery of reliable power from utilities. This report summarizes the technical challenges associated with utilizing power electronics devices across the entire spectrum from applications to manufacturing and materials development, and it provides recommendations for research and development (R&D) needs for power electronics systems in which the U.S. Department of Energy (DOE) could make a substantial impact toward improving the reliability of the bulk power system.

Tolbert, L.M.

2005-12-21T23:59:59.000Z

46

Gila to North Gila Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Western proposes to rebuild and upgrade two, parallel, 4.8-mile-long transmission lines located between Gila and North Gila Substations and take land actions...

47

Energy Star Building Upgrade Value Calculator | Open Energy Information  

Open Energy Info (EERE)

Energy Star Building Upgrade Value Calculator Energy Star Building Upgrade Value Calculator Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy Star Building Upgrade Value Calculator (for Office Properties) Agency/Company /Organization: ENERGY STAR Phase: "Evaluate Options and Determine Feasibility" is not in the list of possible values (Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes, Evaluate Effectiveness and Revise as Needed) for this property. User Interface: Spreadsheet Website: www.energystar.gov/index.cfm?c=comm_real_estate.building_upgrade_value The Building Upgrade Value Calculator allows practitioners to analyze the

48

The Need for Essential Consumer Protections  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Need for Essential Consumer Protections Need for Essential Consumer Protections THE NEED FOR ESSENTIAL CONSUMER PROTECTIONS SMART METERING PROPOSALS AND THE MOVE TO TIME-BASED PRICING August 2010 NCLC NATIONAL CONSUMER L AW C E N T E R ® ® The Need for Essential Consumer Protections Copyright © 2010 AARP, National Consumer Law Center, National Association of State Utility Consumer Advocates, Consumers Union, and Public Citizen. Reprinting with permission. ACkNOwLEDGMENTS The consumer organizations acknowledge the assistance of Barbara R. Alexander, Consumer Affairs Consultant, in the preparation of this paper. 1 There is widespread consensus that the U.S. distribution and transmission systems for vital electricity service need to be modernized and upgraded. This modernization has been recently promoted under the rubric of the

49

Upgrading a Multifuncoid ?  

E-Print Network (OSTI)

I define the concepts of multifuncoid (and completary multifuncoid) and upgrading. Then I conjecture that upgrading of certain multifuncoids are multifuncoids (and that upgrading certain completary multifuncoids are completary multifuncoids). I have proved the conjectures for n ? 2. This short article is the first my public writing where I introduce the concept of multidimensional funcoid which I am investigating now. Refer to this Web site for the theory which I now attempt to generalize. 1

L {x Ai

2012-01-01T23:59:59.000Z

50

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, 37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from the Celilo converter station in The Dalles, Oregon to the Nevada-Oregon border. As part of the project, BPA would remove and salvage the converter terminals 1 and 2 at its Celilo converter station and install a new two-converter terminal. A 20-acre expansion of the existing substation would accommodate the new terminal equipment. About 265 miles of transmission towers on the Celilo-Sylmar 500-kV transmission line would be

51

T10 SND UPGRADE  

E-Print Network (OSTI)

The program of upgrade of the Spherical Neutral Detector for future experiments at a new VEPP-2000 e + e ? collider is presented. Modernization includes upgrades of electromagnetic calorimeter, tracking system, detector electronics, data acquisition system, and offline software. It is also planned to equip the detector with two new subsystems: particle identification system based on aerogel ?erenkov counters and external electron tagging system for ?? physics. 1

unknown authors

2001-01-01T23:59:59.000Z

52

Optics upgrade for switchyard  

SciTech Connect

An upgrade of the Switchyard optics is proposed. This upgrade extends the P3 (old Main Ring) lattice through enclosure C. The septa for the 3-way Meson Area split is moved from enclosure F1 to enclosure M01. The functionality of the Meson Target Train is preserved. Finally, for the purpose of demonstrating that the resulting split can be transported, a straw-man lattice is proposed for enclosure M02 and beyond.

Kobilarcik, Thomas R.; /Fermilab

2005-08-01T23:59:59.000Z

53

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theMontana-Alberta Tie 230 kV Transmission Line: TransmissionNorthern California Transmission Line Project, Technical

Mills, Andrew D.

2009-01-01T23:59:59.000Z

54

Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway  

DOE Green Energy (OSTI)

This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks.

Davis, R.; Biddy, M.; Jones, S.

2013-03-01T23:59:59.000Z

55

Antecedents of consumers' intentions to upgrade their mobile phones  

Science Conference Proceedings (OSTI)

The fourth generation (4G) mobile phone will soon be launched. Marketers need to know which factors determine whether customers choose to upgrade their mobile phones, as this will affect the diffusion of third generation (3G), 4G, and Worldwide Interoperability ... Keywords: Mobile phone, Technology acceptance model (TAM), Upgrade, WiMAX

Fang-Mei Tseng; Hui-Yi Lo

2011-02-01T23:59:59.000Z

56

Duke Energy's Transmission Roadmap Initiative  

Science Conference Proceedings (OSTI)

Duke Energy's Transmission Roadmap Initiative advances a vision for development of a power delivery communications and automation infrastructure. The initiative describes performance of a communications upgrade to substations, implementation of select technologies and applications, and integration of enterprise applications, databases, and systems. This report provides a comprehensive view of Duke's Transmission Roadmap Initiative, with a complete technology assessment, infrastructure overview, and discu...

2009-09-18T23:59:59.000Z

57

Plains & Eastern Clean Line Project Proposal for New or Upgraded  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plains & Eastern Clean Line Project Proposal for New or Upgraded Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010) Update to Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (August 2011) More Documents & Publications EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland Involvement Notice of Intent To Prepare an Environmental Impact Statement for the

58

The Need for Essential Consumer Protections: Smart metering proposals and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

metering metering proposals and the move to time-based pricing. August 2010 The Need for Essential Consumer Protections: Smart metering proposals and the move to time-based pricing. August 2010 There is widespread consensus that the U.S. distribution and transmission systems for vital electricity service need to be modernized and upgraded. This modernization has been recently promoted under the rubric of the Smart Grid. The Smart Grid vision has three primary parts: (1) new communication and digital sensors and automation capabilities for the distribution and transmission systems; (2) new digital metering systems for all customers; and (3) direct interfaces between the new metering systems and customers through inhome technologies. The Need for Essential Consumer Protections: Smart metering proposals and

59

Upgrading Below Grade Spaces  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Patrick H. Huelman, Sam Breidenbach, Steve Schirber Patrick H. Huelman, Sam Breidenbach, Steve Schirber NorthernSTAR Building America Partnership Upgrading Below Grade Spaces Residential Energy Efficiency Stakeholder March 1, 2012 Austin, TX * Act 1: Technical Challenges & Opportunities - Pat Huelman, University of Minnesota * Act 2: Assessing Homeowner Priorities & Risks - Sam Breidenbach, TDS Custom Construction * Act 3: An Industry Perspective - Steve Schirber, Cocoon Act 1. Upgrade Below Grade * Basement Remodeling: It Doesn't Get Any Riskier! - Combustion safety - Foundation moisture - Radon (& other soil gases) - Biologicals (mold, dust mites, etc.) - Garage gases (if attached) * And front and center are uncontrolled... - negative pressures in basements (beyond stack)

60

AGS intensity upgrades  

SciTech Connect

After the successful completion of the AGS Booster and several upgrades of the AGS, a new intensity record of 6.3 x 10{sup 13} protons per pulse accelerated to 24 GeV was achieved. The high intensity slow-extracted beam program at the AGS typically serves about five production targets and about eight experiments including three rare Kaon decay experiments. Further intensity upgrades are being discussed that could increase the average delivered beam intensity by up to a factor of four.

Roser, T.

1995-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Climate balance of biogas upgrading systems  

SciTech Connect

One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO{sub 2}.

Pertl, A., E-mail: andreas.pertl@boku.ac.a [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria); Mostbauer, P.; Obersteiner, G. [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria)

2010-01-15T23:59:59.000Z

62

Biochemical upgrading of oils  

DOE Patents (OSTI)

A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing in organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed.

Premuzic, Eugene T. (East Moriches, NY); Lin, Mow S. (Rocky Point, NY)

1999-01-12T23:59:59.000Z

63

Biochemical upgrading of oils  

DOE Patents (OSTI)

A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

Premuzic, E.T.; Lin, M.S.

1999-01-12T23:59:59.000Z

64

Analysis Efforts Supporting NSTX Upgrades  

SciTech Connect

The National Spherical Torus Experiment (NSTX) is a low aspect ratio, spherical torus (ST) configuration device which is located at Princeton Plasma Physics Laboratory (PPPL) This device is presently being updated to enhance its physics by doubling the TF field to 1 Tesla and increasing the plasma current to 2 Mega-amperes. The upgrades include a replacement of the centerstack and addition of a second neutral beam. The upgrade analyses have two missions. The first is to support design of new components, principally the centerstack, the second is to qualify existing NSTX components for higher loads, which will increase by a factor of four. Cost efficiency was a design goal for new equipment qualification, and reanalysis of the existing components. Showing that older components can sustain the increased loads has been a challenging effort in which designs had to be developed that would limit loading on weaker components, and would minimize the extent of modifications needed. Two areas representing this effort have been chosen to describe in more details: analysis of the current distribution in the new TF inner legs, and, second, analysis of the out-of-plane support of the existing TF outer legs.

H.Zhang, P. Titus, P. Rogoff, A.Zolfaghari, D. Mangra, M. Smith

2010-11-29T23:59:59.000Z

65

The upgrade of GEO600  

E-Print Network (OSTI)

The German / British gravitational wave detector GEO 600 is in the process of being upgraded. The upgrading process of GEO 600, called GEO-HF, will concentrate on the improvement of the sensitivity for high frequency signals and the demonstration of advanced technologies. In the years 2009 to 2011 the detector will undergo a series of upgrade steps, which are described in this paper.

Harald Lück; Christopf Affeldt; Jerome Degallaix; Andreas Freise; Hartmut Grote; Martin Hewitson; Stefan Hild; Jonathan Leong; Mirko Prijatelj; Kenneth A. Strain; Benno Willke; Holger Wittel; Karsten Danzmann

2010-04-02T23:59:59.000Z

66

Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.  

SciTech Connect

This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.

Eyer, James M. (Distributed Utility Associates, Livermore, CA); Butler, Paul Charles; Iannucci, Joseph J., Jr. (,.Distributed Utility Associates, Livermore, CA)

2005-11-01T23:59:59.000Z

67

Preparation for upgrading western subbituminous coal  

SciTech Connect

The objective of this project was to establish the physical and chemical characteristics of western coal and determine the best preparation technologies for upgrading this resource. Western coal was characterized as an abundant, easily mineable, clean, low-sulfur coal with low heating value, high moisture, susceptibility to spontaneous ignition, and considerable transit distances from major markets. Project support was provided by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The research was conducted by the Western Research Institute, (WRI) in Laramie, Wyoming. The project scope of work required the completion of four tasks: (1) project planning, (2) literature searches and verbal contacts with consumers and producers of western coal, (3) selection of the best technologies to upgrade western coal, and (4) identification of research needed to develop the best technologies for upgrading western coals. The results of this research suggest that thermal drying is the best technology for upgrading western coals. There is a significant need for further research in areas involving physical and chemical stabilization of the dried coal product. Excessive particle-size degradation and resulting dustiness, moisture reabsorption, and high susceptibility to spontaneous combustion are key areas requiring further research. Improved testing methods for the determination of equilibrium moisture and susceptibility to spontaneous ignition under various ambient conditions are recommended.

Grimes, R.W.; Cha, C.Y.; Sheesley, D.C.

1990-11-01T23:59:59.000Z

68

The Need for Essential Consumer Protections: Smart Metering Proposals and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Metering Metering Proposals and the Move to Time-Based Pricing The Need for Essential Consumer Protections: Smart Metering Proposals and the Move to Time-Based Pricing There is a widespread consensus that the U.S. distribution and transmission systems for vital electricity service need to be modernized and upgraded to handle not only load growth, but the integration of renewable resources and the potential for a significant increase in electric-powered vehicles. This modernization has been recently promoted under the rubric of the Smart Grid. The Smart Grid vision has three primary parts: (1) new communication and digital sensors and automation capabilities for the distribution and transmission systems, designed to make the grid more reliable and capable of integrating renewable and local-level distribution

69

CRYOGENICS IN BEPCII UPGRADE.  

SciTech Connect

THIS PAPER PRESENTS A CRYOGENIC DESIGN FOR UPGRADING THE BEIJING ELECTRON POSITRON COLLIDER AT THE INSTITUTE OF HIGH ENERGY PHYSICS IN BEIJING. THE UPGRADE INVOLVES 3 NEW SUPERCONDUCTING FACILITIES, THE INTERACTION REGION QUADRUPOLE MAGNETS, THE DETECTOR SOLENOID MAGNETS AND THE SRF CAVITIES. FOR COOLING OF THESE DEVICES, A NEW CRYPLANT WITH A TOTAL CAPACITY OF 1.0KW AT 4.5K IS TO BE BUILT AT IHEP. AN INTEGRATED CRYOGENIC DESIGN TO FIT THE BEPCII CRYOGENIC LOADS WITH HIGH EFFICIENCY IS CARRIEDOUT USING COMPUTATIONAL PROCESS ANALYSIS SOFTWARE WITH THE EMPHASES ON ECONOMICS AND SAFETY IN BOTH CONSTRUCTION AND OPERATION OF THE PLANT. THIS PAPER DESCRIBES THE CRYOGENIC CHARACTERISTICS OF EACH SUPERCONDUCTING DEVICE, THEIR COOLING SCHEMES AND THE OVERALL CRYOPLANT.

JIA,L.; WANG,L.; LI,S.

2002-07-22T23:59:59.000Z

70

Microsoft Word - Lower-MidColumbia-Upgrade-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Steve Prickett Project Manager - TEP Proposed Action: Lower Mid-Columbia / Midway-Vantage 230-kV Transmission Line Upgrade Project Budget Information: Work Order #238901 and #231311, Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility..." B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. B4.13 "Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines

71

The LHCb VELO Upgrade  

E-Print Network (OSTI)

LHCb is a forward spectrometer experiment dedicated to the study of new physics in the decays of beauty and charm hadrons produced in proton collisions at the Large Hadron Collider (LHC) at CERN. The VErtex LOcator (VELO) is the microstrip silicon detector surrounding the interaction point, providing tracking and vertexing measurements. The upgrade of the LHCb experiment, planned for 2018, will increase the luminosity up to $\\rm 2\\times10^{33}\\ cm^{-2}s^{-1}$ and will perform the readout as a trigger-less system with an event rate of 40 MHz. Extremely non-uniform radiation doses will reach up to $\\rm 5 \\times 10^{15}$ 1 MeV$\\rm n_{eq}/cm^2$ in the innermost regions of the VELO sensors, and the output data bandwidth will be increased by a factor of 40. An upgraded detector is under development based in a pixel sensor of the Timepix/Medipix family, with 55 x 55 $\\rm \\mu m^2$ pixels. In addition a microstrip solution with finer pitch, higher granularity and thinner than the current detector is being developed in parallel. The current status of the VELO upgrade program will be described together with recent testbeam results.

Rodriguez Perez P.; LHCb VELO Group

2013-02-25T23:59:59.000Z

72

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theand Preference in Transmission Service. ” Washington, D.C. :Integrating Wind into Transmission Planning: The Rocky

Mills, Andrew D.

2009-01-01T23:59:59.000Z

73

Global Scratch Upgrade in Progress  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Scratch Gets Global Scratch Gets an Upgrade Global Scratch Gets an Upgrade Improvements Will Include Higher Data Output Rates, Connection to PDSF October 29, 2013 The most used file system at the National Energy Research Scientific Computing Center (NERSC)-global scratch-just got an upgrade. As a result, some users may see their data output to global scratch reach up to 80 gigabytes per second. Although users will probably not see their 20-terabyte storage quotas increase, the upgrade ensures that global scratch remains flexible and paves the way for PDSF to eventually use the file system Because of the upgrade, users will also be able to better access their temporary data files or "scratch data" from any NERSC system, not just the one that generated it. Prior to the upgrade, Global scratch typically

74

Upgrading of TREAT experimental capabilities  

Science Conference Proceedings (OSTI)

The TREAT facility at the Argonne National Laboratory site in the Idaho National Engineering Laboratory is being upgraded to provide capabilities for fast-reactor-safety transient experiments not possible at any other experimental facility. Principal TREAT Upgrade (TU) goal is provision for 37-pin size experiments on energetics of core-disruptive accidents (CDA) in fast breeder reactor cores with moderate sodium void coefficients. this goal requires a significant enhancement of the capabilities of the TREAT facility, specifically including reactor control, hardened neutron spectrum incident on the test sample, and enlarged building. The upgraded facility will retain the capability for small-size experiments of the types currently being performed in TREAT. Reactor building and crane upgrading have been completed. TU schedules call for the components of the upgraded reactor system to be finished in 1984, including upgraded TREAT fuel and control system, and expanded coverage by the hodoscope fuel-motion diagnostics system.

Dickerman, C.E.; Rose, D.; Bhattacharyya, S.K.

1982-01-01T23:59:59.000Z

75

Upgraded Coal Interest Group  

Science Conference Proceedings (OSTI)

The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

Evan Hughes

2009-01-08T23:59:59.000Z

76

Energy Star Building Upgrade Manual  

NLE Websites -- All DOE Office Websites (Extended Search)

program helping businesses and individuals fight global warming through superior energy efficiency. ENERGY STAR Building Upgrade Manual United States Environmental Protection...

77

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

Science Conference Proceedings (OSTI)

California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

2008-07-01T23:59:59.000Z

78

Microsoft Word - CX-BettasRd-ColumbiaThermalUpgradeFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2012 25, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: Bettas Road-Columbia No. 1 230-kV transmission line thermal upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.13, Upgrading and rebuilding existing powerlines Location: Kittitas and Chelan counties, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The project, as proposed, is to upgrade the existing Bettas Road-Columbia No. 1 230-kV transmission line to a maximum operating temperature of 100 °C. Five small segments (equal to approximately 3 miles) along the transmission line will be upgraded in order to meet this overall objective. Construction includes the relocation and

79

Tenneco upgrades natural gasoline  

SciTech Connect

Tenneco Oil Co. recently completed a natural gasoline upgrading project at its LaPorte, Tex., facility. The project was started in October 1985. The purpose was to fractionate natural gasoline and isomerize the n-pentane component. Three factors made this a particularly attractive project for the LaPorte complex: 1. The phase down of lead in gasoline made further processing of natural gasoline desirable. 2. Idle equipment and trained personnel were available at the plant as a result of a switch of Tenneco's natural gas liquids (NGL) fractionation to its Mont Belvieu, Tex., facility. 3. The plant interconnects with Houston's local markets. It has pipelines to Mont Belvieu, Texas City, and plants along the Houston Ship Channel, as well as truck, tank car, and barge-loading facilities. Here are the details on the operation of the facilities, the changes which were required to enable the plant to operate successfully, and how this conversion was completed in a timely fashion.

O'Gorman, E.K.

1986-08-01T23:59:59.000Z

80

Find Financing for Energy Efficiency Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Find Financing for Energy Efficiency Upgrades Find Financing for Energy Efficiency Upgrades Find Financing for Energy Efficiency Upgrades Photo of a block in lower downtown Denver that is part of Living City Block, a DOE Commercial Building Partnerships participant. Financing need not be a barrier to improving energy efficiency in your commercial building. There are federal, state, and local and tax incentives for energy efficiency upgrades, and other financial opportunities to help you meet your energy goals. The U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy, for example, offers financial assistance opportunities to business, industry, universities, and others for the development and demonstration of energy efficiency strategies and technologies. Other methods of financing energy efficiency improvements

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Case Study - Energy Efficiency Upgrades for Fermilab Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure October 7, 2013 - 3:29pm Addthis Utility energy service contracting provides needed plant improvements. Photo of Project Coordinator Steve Krstulovich with Fermilab's new 1400-ton, high-efficiency chiller. Project Coordinator Steve Krstulovich with Fermilab's new 1400-ton, high-efficiency chiller. Overview The U.S. Department of Energy's (DOE's) Fermi National Accelerator Laboratory (Fermilab) has replaced old equipment and reduced energy consumption through a partnership with its electric utility, Commonwealth Edison. Fermilab upgraded the centralized cooling system and separated the system into two segments - a "comfort system" to cool the employee office

82

Transmission INTRODUCTION  

E-Print Network (OSTI)

Transmission INTRODUCTION An electrical power system requires constant, second by second, balancing to maintain control over the transmission system can result in failure of the entire electrical system of supply, demand, and transmission capability. Transmission system operators are primarily responsible

83

Public Technical Conference on DOE Congestion Study and Criteria for Designation of National Interest Electric Transmission Corridors  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Conference Technical Conference DOE Congestion Study and Criteria Designation of National Interest Electric Transmission Corridors March 29, 2006 Comments of Edward D. Tatum, Jr. Old Dominion Electric Cooperative Constraint Area and Corridor Designation * Corridors need to be "just right" * Too broad a designation could frustrate Congress' intent to facilitate licensing * Identify specific facilities rather than a family of alternatives - Too many; too long - Recognize impact on existing facilities Constraint Area and Corridor Designation * Existing infrastructure points with generalized paths between * Need "off ramps" * Opportunity to upgrade existing facilities or utilize existing ROW * Need to deliver into congested area * Provide States necessary opportunity for final

84

Microsoft Word - CX-Big Eddy-TroutdaleUpgradeFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Erich Orth Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Big Eddy - Troutdale No. 1 230 kV Transmission Line Upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.13, Upgrading and Rebuilding Existing Powerlines. Location: Wasco, Hood River and Clackamas counties, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The project, as proposed, is the thermal upgrade of the BPA Big Eddy - Troutdale No.1 230 kV Transmission Line: Background BPA's Big Eddy - Troutdale No. 1 230-kV transmission line is one of three major transmission lines that cross the Oregon Cascade Mountains. These lines transport The Dalles hydro generation and northwest wind generation output in the east to load centers west of the Cascades, like

85

Dynamic Mercury Cycling Model Upgrade  

Science Conference Proceedings (OSTI)

This technical update describes the status of activities to upgrade the Dynamic Mercury Cycling Model (D-MCM), an EPRI simulation model that predicts mercury cycling and bioaccumulation in lakes.

2008-12-17T23:59:59.000Z

86

Syngas Upgrading to Hydrocarbon Fuels Technology Pathway  

DOE Green Energy (OSTI)

This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and lowest risk conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas-to-hydrocarbon pathway to be competitive with petroleum-derived gasoline-, diesel- and jet-range hydrocarbon blendstocks.

Talmadge, M.; Biddy, M.; Dutta, A.; Jones, S.; Meyer, A.

2013-03-01T23:59:59.000Z

87

EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona  

NLE Websites -- All DOE Office Websites (Extended Search)

48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, 48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona SUMMARY DOE's Western Area Power Administration (Western) is preparing an EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies. PUBLIC COMMENT OPPORTUNITIES Send comments on the Draft Environmental Assessment by January 21, 2014, by

88

User and Performance Impacts from Franklin Upgrades  

SciTech Connect

The NERSC flagship computer Cray XT4 system"Franklin" has gone through three major upgrades: quad core upgrade, CLE 2.1 upgrade, and IO upgrade, during the past year. In this paper, we will discuss the various aspects of the user impacts such as user access, user environment, and user issues etc from these upgrades. The performance impacts on the kernel benchmarks and selected application benchmarks will also be presented.

He, Yun (Helen)

2009-05-10T23:59:59.000Z

89

NREL: Transmission Grid Integration - Eastern Renewable Generation...  

NLE Websites -- All DOE Office Websites (Extended Search)

transmission? How does geographic diversity of wind reduce wind integration costs? How do offshore and onshore wind power compare? What transmission is needed to facilitate higher...

90

Chapter 4 Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

91

Microsoft Word - CX-HatwaiSubstationUpgradesFY11_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18, 2011 18, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at Hatwai Substation Budget Information: Work Order: 00004952 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to: switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms.

92

Microsoft Word - CX-AlveyMaintenanceHQ_PoleStorageUpgrade_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Environmental protection system upgrades at pole storage facility at Alvey Maintenance Headquarters. Budget Information: Work Order #00283226 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms.

93

Transmission upgrades compensate for coal-fired retirements in ...  

U.S. Energy Information Administration (EIA)

Biofuels: Ethanol & Biodiesel ... improve the flow of power between regions. PJM has an overall reserve margin of 29%, 13 percentage points above its target, ...

94

upgrade | OpenEI Community  

Open Energy Info (EERE)

4 4 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235354 Varnish cache server upgrade Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 22 October, 2012 - 07:23 Semantic Mediawiki Semantic Forms update developer Incentives and Policies Semantic Mediawiki upgrade Utility Rates We have just updated Semantic Forms on OpenEI to version 2.4 to enable some upgrades to the utility rate forms (thanks Teresa!). If you see any problems in forms you use on OpenEI, please notify us by commenting on this

95

The D0 detector upgrade  

SciTech Connect

The Fermilab collider program is undergoing a major upgrade of both the accelerator complex and the two detectors. Operation of the Tevatron at luminosities upwards of ten time that currently provided will occur in early 1999 after the commissioning of the new Fermilab Main Injector. The D0 upgrade program has been established to deliver a detector that will meet the challenges of this environment. A new magnetic tracker consisting of a superconducting solenoid, a silicon vertex detector, a scintillating fiber central tracker, and a central preshower detector will replace the current central tracking and transition radiation chambers. We present the design and performance capabilities of these new systems and describe results from physics simulations that demonstrate the physics reach of the upgraded detector.

Bross, A.D.

1995-02-01T23:59:59.000Z

96

ENERGY STAR Building Upgrade Manual Chapter 9: Heating and Cooling...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 9: Heating and Cooling Upgrades The Building Upgrade...

97

Energy Upgrade Program Revitalizing Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Upgrade Program Revitalizing Oregon Energy Upgrade Program Revitalizing Oregon Energy Upgrade Program Revitalizing Oregon May 28, 2010 - 2:38pm Addthis Joshua DeLung What does this project do? Local businesses in 13 communities are getting energy makeovers in an effort to help business owners save hundreds of dollars each year and revitalize downtown areas. 'Main streets' in Clackamas County, Oregon, are undergoing a makeover - an energy-efficiency makeover. As part of the Clackamas County Energy Efficiency on Main Street Program, local businesses in 13 communities are getting energy makeovers in an effort to help business owners save hundreds of dollars each year and revitalize downtown areas. First to save The program needed a guinea pig to be the first to receive a free energy audit and found a willing participant in Key Carpets, a Molalla-based store

98

Non-Profit Brighter After Upgrade | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Profit Brighter After Upgrade Non-Profit Brighter After Upgrade Non-Profit Brighter After Upgrade September 21, 2010 - 11:09am Addthis Loretta Prencipe Senior Communications Analyst, Office of Energy Efficiency & Renewable Energy In the Spring of 2010, the Arizona State Energy Program awarded Recovery Act funds to 14 non-profit organizations throughout the state for energy projects. One of the recipients, St. Vincent de Paul, is a human services organization that assists people in need throughout Central and Northern Arizona. The nonprofit partnered with Glendale, Arizona-based Natural Lighting Company to install skylights at the facility. In the above video, find out how this project is helping both the nonprofit and the local company. The video was created by Jim Arwood, an independent producer and former

99

Substation voltage upgrading  

SciTech Connect

This report addresses specific issues to support sound yet not unduly conservative uprating practices for substations. The main parts of the report cover the insulation withstand and overvoltage protection aspects, environmental measurements, reliability criteria, and industry experience. First the insulation design concerns are addressed. Substation stress by a backflashover of the line insulation due to lightning in the vicinity of the substation is recognized as a critical stress. A representative part of a 550 kV BIL substation was erected at the EPRI High Voltage Transmission Research Center, where also a special test circuit was assembled to produce a fast front, slow tail (0.2/200 {mu}s) wave. The substation as well as some special configurations were tested for line-to-ground and line-to-line withstand. Computer studies were performed to complement the test results. A number of important conclusions was reached. The most prominent result in that the high frequency oscillations, as caused by reflections within the substation, do not effect the Critical Flashover Voltage (CFO). The present practice, based on the highest peak is therefore very conservative. The slow tail of the wave appears to dictate the CFO. An arrester model for computer studies to represent very fast as well as slow phenomena was derived. It is based on full scale arrester test data, made available in this project. The computer program to calculate arrester model parameters is also a part of the report. The electric environmental measurements are reported for the tested substation at the HVTRC and for the uprated substation of Public Service Company of Colorado, both before and after the uprating. The performance is satisfactory when corona free hardware is used. Insulation design criteria are analyzed based on substation reliability, the system viewpoint and consequences of the failure. Utility experience with uprated substations is reviewed.

Panek, J.; Elahi, H.; Lux, A.; Imece, A.F. (General Electric Co., Schenectady, NY (United States). Power Systems Engineering Dept.); LaPanse, R.A.; Stewart, J.R. (Public Service Co. of Colorado, Denver, CO (United States))

1992-04-01T23:59:59.000Z

100

The electric delivery system-a complex network of transmission and distribu  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

electric delivery system-a complex network of transmission and distribu- electric delivery system-a complex network of transmission and distribu- tion lines, substations, and electrical components-is aging. To deliver more electricity and ensure reliability, the grid needs to be modernized. As the grid is being upgraded, it is also being challenged by increased needs to integrate variable renewable energy resources such as solar and wind, the potential growth of electric vehicles and related charging infrastructure, and the potential development of new electricity market designs and operating practices. To help decision makers better understand how these changes and challenges are shaping electricity delivery systems, as well as provide the industry with the tools necessary to cope with the new designs, the Reliability and Markets activ-

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

CATEGORICAL EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES, EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES, 300 AREA, HANFORD SITE, RICHLAND, WASHINGTON Proposed Action: The U.S. Department of Energy (DOE), Pacific Northwest Site Office (PNSO) proposes to upgrade a landscaping irrigation system in the 300 Area. Location of Action: In the landscaped area around the 331 Building, Hanford Site Description of the Proposed Action: The proposed action is to upgrade the existing 331 Building landscaping irrigation system by using nearby aquaculture effluent instead of

102

Transmission Planning | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

103

Investment and Upgrade in Distributed Generation under Uncertainty  

E-Print Network (OSTI)

AS, Marnay, C. Distributed generation investment by aand Upgrade in Distributed Generation under Uncertaintyand Upgrade in Distributed Generation under Uncertainty ?

Siddiqui, Afzal

2008-01-01T23:59:59.000Z

104

Microsoft Word - CX-2013ElectronicEquipmentUpgrades_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 12, 2013 April 12, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Molly Kovaka Bob Trismen Contractor - TEP-CSB-2 Electrical Engineer - TEP-CSB-1 Proposed Action: Electronic Equipment Upgrades and Emergency Generator Replacements PP&A Project No: 2571 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment; B1.3 Routine maintenance activities Location: Multiple locations within Bonneville Power Administration's (BPA) service area. Proposed by: BPA Description of the Proposed Action: BPA proposes to upgrade electronic equipment required for operation of its transmission grid and replace emergency generators. Several types of actions involving communications, meters, relays, and Remedial Action Scheme (RAS) and Supervisory

105

Prioritizing and scheduling Portsmouth Gaseous Diffusion Plant safeguards upgrades. Final report  

Science Conference Proceedings (OSTI)

As part of the Site Safeguards and Security Plan (SSSP), facilities are required to develop a Resource Plan (RP). The Resource Plan provides documentation and justification for the facility`s planned upgrades, including the schedule, priority, and cost estimates for the safeguards and security upgrades. Portsmouth Gaseous Diffusion Plant (PORTS) management has identified and obtained funding approval for a number of safeguards and security upgrades, including line-item construction projects. These upgrade projects were selected to address a variety of concerns identified in the PORTS vulnerability assessments and other reviews performed in support of the SSSP process. However, budgeting and scheduling constraints do not make it possible to simultaneously begin implementation of all of the upgrade projects. A formal methodology and analysis are needed to explicitly address the trade-offs between competing safeguards objectives, and to prioritize and schedule the upgrade projects to ensure that the maximum benefit can be realized in the shortest possible time frame. The purpose of this report is to describe the methodology developed to support these upgrade project scheduling decisions. The report also presents the results obtained from applying the methodology to a set of the upgrade projects selected by PORTS S&S management. Data for the analysis are based on discussions with personnel familiar with the PORTS safeguards and security needs, the requirements for implementing these upgrades, and upgrade funding limitations. The analysis results presented here assume continued highly enriched uranium (HEU) operations at PORTS. However, the methodology developed is readily adaptable for the evaluation of other operational scenarios and other resource allocation issues relevant to PORTS.

Edmunds, T.; Saleh, R.; Zevanove, S.

1992-02-01T23:59:59.000Z

106

About: Why Energy Efficiency Upgrades  

NLE Websites -- All DOE Office Websites (Extended Search)

Why Energy Efficiency Upgrades Why Energy Efficiency Upgrades Two photos side by side showing energy loss through the use of infrared technology. As part of a home energy evaluation, an energy professional can use an infrared camera to pinpoint where air leaks and drafts are occurring in your home or building. Although normally difficult to see, these infrared photos clearly show in color where energy losses are occurring in a typical house. How We Use Energy in Our Buildings How We Use Energy in Our Homes (% of Energy Consumption) A pie chart illustrating the following breakdown: Space heating 43%, space cooling 9.7%, water heating 17.1%, lighting 6.2%, refrigeration 3.9%, electronics 3%, wet cleaning 3.2%, cooking 3.1%, computers 1.6%. Source: 2010 Buildings Energy Data Book, Table 2.1.6

107

MIPP Plastic Ball electronics upgrade  

SciTech Connect

An upgrade electronics design for Plastic Ball detector is described. The Plastic Ball detector was a part of several experiments in the past and its back portion (proposed to be used in MIPP) consists of 340 photomultipliers equipped with a sandwich scintillator. The scintillator sandwich has fast and slow signal component with decay times 10 ns and 1 {micro}s respectively. The upgraded MIPP experiment will collect up to 12,000 events during each 4 second spill and read them out in {approx}50 seconds between spills. The MIPP data acquisition system will employ deadtime-less concept successfully implemented in Muon Electronics of Dzero experiment at Fermilab. An 8-channel prototype design of the Plastic Ball Front End (PBFE) implementing these requirements is discussed. Details of the schematic design, simulation and prototype test results are discussed.

Baldin, Boris; /Fermilab

2009-01-01T23:59:59.000Z

108

The FNAL Injector Upgrade Status  

SciTech Connect

The new FNAL H{sup -} injector upgrade is currently being tested before installation in the Spring 2012 shutdown of the accelerator complex. This line consists of an H{sup -} source, low energy beam transport (LEBT), 200 MHz RFQ and medium energy beam transport (MEBT). Beam measurements have been performed to validate the design before installation. The results of the beam measurements are presented in this paper.

Tan, C.Y.; Bollinger, D.S.; Duel, K.L.; Karns, P.R.; Lackey, J.R.; Pellico, W.A; Scarpine, V.E.; Tomlin, R.E.; /Fermilab

2012-05-14T23:59:59.000Z

109

Energy Upgrade California | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upgrade California Upgrade California Energy Upgrade California < Back Eligibility Multi-Family Residential Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Other Sealing Your Home Ventilation Manufacturing Heating Windows, Doors, & Skylights Program Info Funding Source The American Reinvestment and Recovery Act of 2009, ratepayer funds State California Program Type State Rebate Program Rebate Amount Basic Upgrade Package: 1,000 Advance Upgrade Package: 1,500 - 4,000 The Energy Upgrade California program serves as a one-stop shop for California homeowners who want to improve the energy efficiency of their homes. The program connects homeowners with qualified contractors, and helps homeowners find all the available incentives from their local

110

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

111

Main Generator Excitation System Upgrade/Retrofit  

Science Conference Proceedings (OSTI)

Upgrading or replacing even a portion of the excitation system of a generator can provide increased reliability and availability while simultaneously decreasing operational and maintenance costs. However, the upgrade or retrofit of an excitation system is a major cost involving some degree of implementation, installation, or performance risk. This report provides lessons learned, experiences, practices and solutions from plants that have installed excitation system retrofits and upgrades. This informatio...

2005-11-07T23:59:59.000Z

112

The Upgraded D0 detector  

Science Conference Proceedings (OSTI)

The D0 experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to D0.

Abazov, V.M.; Abbott, B.; Abolins, M.; Acharya, B.S.; Adams, D.L.; Adams, M.; Adams, T.; Agelou, M.; Agram, J.-L.; Ahmed, S.N.; Ahn, S.H.; Ahsan, M.; Alexeev, G.D.; Alkhazov, G.; Alton, A.; Alverson, G.; Alves, G.A.; Anastasoaie, M.; Andeen, T.; Anderson, J.T.; Anderson, S.; /Buenos Aires U. /Rio de Janeiro, CBPF /Sao Paulo, IFT /Alberta U. /Simon Fraser U. /York U., Canada /McGill U. /Beijing, Inst. High Energy Phys. /Hefei, CUST /Andes U., Bogota /Charles U. /Prague, Tech. U. /Prague, Inst. Phys. /San Francisco de Quito U. /Clermont-Ferrand U. /LPSC, Grenoble /Marseille, CPPM /Orsay, LAL /Paris U., VI-VII /DAPNIA, Saclay /Strasbourg, IReS

2005-07-01T23:59:59.000Z

113

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

114

Upgrade Boilers with Energy-Efficient Burners  

SciTech Connect

This revised ITP steam tip sheet on upgrading boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

2006-01-01T23:59:59.000Z

115

Better Buildings Neighborhood Program: Energy Efficiency Upgrades...  

NLE Websites -- All DOE Office Websites (Extended Search)

PYC made the recommended energy efficiency upgrades, which included new insulation and air sealing, a new hot water heater, programmable thermostats, improved lighting, and new...

116

ENERGY STAR Building Upgrade Manual | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

ENERGY STAR Building Upgrade Manual Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new...

117

Microsoft Word - CX-Olympia-SouthElma_upgrades_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2011 0, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: The project consists of upgrades to the Olympia-South Elma No. 1, 115-kV transmission line from structure 21/10 to Elma Substation. Budget Information: Work Order #251089 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not effect the environment beyond the previously developed facility area including but not limited to....tower modifications, changing insulators, and replacement of poles ...conductors...and crossarms. Location: The project is located in Grays Harbor County, Washington along Bonneville Power

118

Assessment of Distributed Resources: A Case Study for Tri-State Generation and Transmission Association, Inc.  

Science Conference Proceedings (OSTI)

During the process of upgrading service for three distribution customers, Tri-State Generation and Transmission Association (Tri-State) evaluated various distributed generation (DIS-GEN) options. Candidate DIS-GEN systems competitive with other options could become the basis for customer upgrade solutions.

1997-12-05T23:59:59.000Z

119

Accelerator Need  

NLE Websites -- All DOE Office Websites (Extended Search)

Need for Large Accelerators An Article Written Originally for Midlevel Teachers Back In order to study small particles, a high energy beam of particles must be generated. The...

120

Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway  

Science Conference Proceedings (OSTI)

In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline, diesel and jet range hydrocarbon blendstocks.

Davis, Ryan; Biddy, Mary J.; Jones, Susanne B.

2013-03-31T23:59:59.000Z

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Omega Transmission Lines  

E-Print Network (OSTI)

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

122

Research Laboratory Experiments with Energy Efficiency Upgrades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades August 30, 2012 - 11:52am Addthis Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Julie McAlpin Communications Liaison, State Energy Program

123

Future Upgrades | Brookhaven and the LHC  

NLE Websites -- All DOE Office Websites (Extended Search)

Future Upgrades Future Upgrades Magnetic field inside a Nb3Sn quadropole magnet Magnetic field inside a Nb3Sn quadropole magnet. Brookhaven leads various technical coordination efforts for the upgrade of the ATLAS detector, including constructing the new silicon tracker, liquid argon electronics, and the new muon chambers. Brookhaven also contributes to the commissioning and future upgrade of the LHC itself in two areas: accelerator physics and superconducting magnets. This work is carried out as part of the U.S. LHC Accelerator Research Program (LARP) in collaboration with Fermilab, Lawrence Berkeley National Lab, and the Stanford Linear Accelerator Center. The ultimate goal of the upgrade program is to increase the rate and efficiency of particle collisions, a measure known as luminosity.

124

MMCR Upgrades: Present Status and Future Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

MMCR Upgrades: Present Status and Future Plans MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital signal processor that significantly increases the temporal resolution and the processing capability of the MMCR. The Barrow MMCR upgrade will be completed in early 2004. We will discuss the hardware and software C40 upgrade to the MMCRs at SGP and Barrow and the plans

125

Research Laboratory Experiments with Energy Efficiency Upgrades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades August 30, 2012 - 11:52am Addthis Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Julie McAlpin Communications Liaison, State Energy Program

126

APS Upgrade | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APS APS View Larger The brightness and energy of x-ray beams are critical properties for research. Higher brightness means more x-rays can be focused onto a smaller, laser-like spot, allowing researchers to gather more data in greater detail in less time. Higher energies allow x-rays to penetrate deeper inside materials to reveal crucial information about a material's structure and function. The combination of high brightness and high energy allows the observation and imaging - in real time - of fast and ultrafast technologically important processes, including fuel sprays, magnetic switching, and biological processes in living organisms. The APS Upgrade project will increase the brightness of the APS high-energy (hard) x-ray beams. This will equip researchers for the groundbreaking

127

APS Upgrade | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop on new science opportunities provided by a multi-bend achromat lattice at the APS APS-U MBA Lattice Workshop Registration is now closed. Please contact Diane Wilkinson ext. 7810 or a member of the Workshop Organizing Committee for changes or modifications to your registration. Submit Comments, Suggestions, and Ideas for MBA Lattice Workshop October 21-22 Advanced Photon Source Argonne National Lab The Advanced Photon Source Upgrade is focused on delivering a powerful, versatile facility for science using high-brightness, high-energy X-rays. At APS, and around the light source community, scientists have been developing storage ring designs that push closer to the ultimate diffraction limit for X-ray sources. A recent report by the Basic Energy Sciences Advisory Committee, which advises the Director of the U.S.

128

Energy Efficiency Through Lighting Upgrades  

Science Conference Proceedings (OSTI)

Lighting upgrades including neon to LED, incandescent to CFL's and T-12 to T-8 and T-5's were completed through this grant. A total of 16 Chickasaw nation facilities decreased their carbon footprint because of these grant funds. Calculations used were based on comparing the energy usage from the previous year�¢����s average and the current energy usage. For facilities without a full year's set of energy bills, the month after installation was compared to the same month from the previous year. Overall, the effect the lighting change-outs had for the gaming centers and casinos far exceeded expectations. For the Madill Gaming Center; both an interior and exterior upgrade was performed which resulted in a 31% decrease in energy consumption. This same reduction was seen in every facility that participated in the grant. Just by simply changing out light bulbs to newer energy efficient equivalents, a decrease in energy usage can be achieved and this was validated by the return on investment seen at Chickasaw Nation facilities. Along with the technical project tasks were awareness sessions presented at Chickasaw Head Starts. The positive message of environmental stewardship was passed down to head start students and passed along to Chickasaw employees. Excitement was created in those that learned what they could do to help reduce their energy bills and many followed through and took the idea home. For a fairy low cost, the general public can also use this technique to lower their energy consumption both at home and at work. Although the idea behind the project was somewhat simple, true benefits have been gained through environmental awareness and reductions of energy costs.

Kara Berst; Maria Howeth

2010-06-01T23:59:59.000Z

129

Efficiency Benefits of EHV AC Transmission and Overlays in Interregional Transmission Expansion Planning  

Science Conference Proceedings (OSTI)

In the United States, transmission expansion planning historically focused on addressing local utility transmission needs. In the mid-to-late 1990s, the focus shifted to encompass regional transmission expansion, primarily driven by Federal Energy Regulatory Commission (FERC) mandates on open transmission access and emergence of regional transmission organizations. In recent years, three drivers have elevated transmission expansion planning to a higher, interregional level. These drivers are the ...

2012-11-29T23:59:59.000Z

130

Transmission Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

131

Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades  

NLE Websites -- All DOE Office Websites (Extended Search)

About About Printable Version Share this resource Send a link to Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades to someone by E-mail Share Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Facebook Tweet about Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Twitter Bookmark Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Google Bookmark Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Delicious Rank Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Digg Find More places to share Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on AddThis.com... Our History Related Federal Programs Why Energy Efficiency Upgrades

132

EA-1321: Proposed Upgrade and Improvement of The National Synchrotron...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York EA-1321: Proposed Upgrade and Improvement of...

133

Using QECBs for Public Building Upgrades: Reducing Energy Bills...  

NLE Websites -- All DOE Office Websites (Extended Search)

Public Building Upgrades: Reducing Energy Bills in the City of Philadelphia Title Using QECBs for Public Building Upgrades: Reducing Energy Bills in the City of Philadelphia...

134

ENERGY STAR Building Upgrade Manual Chapter 13: Retail Stores...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 13: Retail Stores The Building Upgrade Manual is a...

135

ENERGY STAR Building Upgrade Manual Chapter 7: Supplemental Load...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 7: Supplemental Load Reduction The Building Upgrade...

136

ENERGY STAR Building Upgrade Manual Chapter 6: Lighting | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 6: Lighting The Building Upgrade Manual is a...

137

ENERGY STAR Building Upgrade Manual Chapter 5: Retrocommissioning...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 5: Retrocommissioning The Building Upgrade Manual is...

138

ENERGY STAR Building Upgrade Manual Chapter 12: Hotels and Motels...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 12: Hotels and Motels The Building Upgrade Manual is...

139

ENERGY STAR Building Upgrade Manual Chapter 10: K-12 Schools...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 10: K-12 Schools The Building Upgrade Manual is a...

140

ENERGY STAR Building Upgrade Manual Chapter 4: Financing | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 4: Financing The Building Upgrade Manual is a...

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Boiler Upgrades and Decentralizing Steam Systems Save Water and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Boiler Upgrades and Decentralizing Steam Systems Save Water and Energy at Naval Air Station Oceana Boiler Upgrades and Decentralizing Steam Systems Save Water and Energy at Naval...

142

Microsoft Word - CX-DixieSubstationUpgradesFY11_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at Dixie Substation Budget Information: Work Order: 00004952 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. Location: PLS T1S R8E S1 Dixie Substation in Elmore County, Idaho.

143

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.  

SciTech Connect

BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

144

Syngas Upgrading to Hydrocarbon Fuels Technology Pathway  

SciTech Connect

In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This pathway case investigates the upgrading of biomass derived synthesis gas (‘syngas’) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and risk adverse conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas to hydrocarbon pathway to be competitive with petroleum-derived gasoline, diesel and jet range blendstocks.

Talmadge, M.; Biddy, Mary J.; Dutta, Abhijit; Jones, Susanne B.; Meyer, Pimphan A.

2013-03-31T23:59:59.000Z

145

Screening of processing and upgrading schemes  

DOE Green Energy (OSTI)

The RFP was predicated on DOE's desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily skimmed'' from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

Not Available

1991-10-01T23:59:59.000Z

146

Building America Perspective and Overlay to the Energy Upgrade California Approach  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Perspective & Perspective & Overlay to the Energy Upgrade California Approach Driving demand through targeted neighborhood programs By Mark Berman, Alliance for Residential Building Innovation BA Residential Energy Efficiency Stakeholder Meeting - March 1, 2012 Austin, TX Relevant BAP Gaps & Barriers 1. Difficulty in recruiting homeowners to participate in home energy upgrade programs. (Recruitment) 2. Need to develop sustainable retrofit business models (Biz Models) - Review business models in Better Buildings Program & other programs 3. Data mining - need to analyze utility bills to get a sense of whole-house efficiency and savings (Aggregate Results) 2 Overview: Stockton CA

147

Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed.

N /A

2002-08-16T23:59:59.000Z

148

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

149

Steam-system upgrades | Open Energy Information  

Open Energy Info (EERE)

Linked Data Page Edit History Share this page on Facebook icon Twitter icon Steam-system upgrades Jump to: navigation, search TODO: Add description List of Steam-system...

150

Upgrading of light Fischer-Tropsch products  

SciTech Connect

The upgrading of Fischer-Tropsch (F-T) light ends was studied at UOP in a program sponsored by the Pittsburgh Energy Technology Center of the US Department of Energy. The goal of the program was to increase the overall yield of marketable transportation fuels from the F-T upgrading complex by focusing on liquefied petroleum gas (LPG) and naphtha. An overview of the entire light-ends program is presented in this paper. Although this contract is specifically concerned with light products (C{sub 3}-C{sub 11}), a separate DOE-sponsored program at UOP investigated the characterization and upgrading of the heavy end of the F-T product spectrum: F-T wax. An economic analysis of the light and heavy ends upgrading was performed to evaluate the conversion of F-T products to marketable transportation fuels. 9 refs., 7 figs., 9 tabs.

Shah, P.P.

1990-11-30T23:59:59.000Z

151

12 GeV Upgrade | Jefferson Lab  

NLE Websites -- All DOE Office Websites

Science Science A Schematic of the 12 GeV Upgrade The 12 GeV Upgrade will greatly expand the research capabilities of Jefferson Lab, adding a fourth experimental hall, upgrading existing halls and doubling the power of the lab's accelerator. A D D I T I O N A L L I N K S: 12 GeV Home Public Interest Scientific Opportunities Hall D Status Updates Contacts Three-Year Accelerator Schedule 2014 - 2016 top-right bottom-left-corner bottom-right-corner 12 GeV Upgrade Physicists at Jefferson Lab are trying to find answers to some of nature's most perplexing questions about the universe by exploring the nucleus of the atom. Their goal is to answer such questions as: "What is the universe made of?" and "What holds everyday matter together?" In their search for answers, physicists smash electrons into atoms using

152

Pricing and Market Segmentation with Software Upgrades.  

E-Print Network (OSTI)

it selects and the number of customers attracted by theseincrease in the number of upgrading customers. Thus, p ? = ?is because: (1) the number of total customers is F c (?) in

Bala, R.; Carr, S. C.

2005-01-01T23:59:59.000Z

153

User and Performance Impacts from Franklin Upgrades  

E-Print Network (OSTI)

J. Lebens. Post- Mortem of the NERSC Franklin XT4 Upgrade toCray User Group Meeting NERSC Franklin Home Page: http://planning from both Cray and NERSC, service interruptions

He, Yun Helen

2009-01-01T23:59:59.000Z

154

Transmission Expansion Planning with Re-design  

E-Print Network (OSTI)

Aug 3, 2009 ... Abstract: Expanding an electrical transmission network requires heavy investments that need to be carefully planned, often at a regional or ...

155

Commissioning Results of the Upgraded Neutralized Drift Compression Experiment  

E-Print Network (OSTI)

COMMISSIONING RESULTS OF THE UPGRADED NEUTRALIZED DRIFTexperiments. We report on commissioning results of the

Lidia, S.M.

2009-01-01T23:59:59.000Z

156

Cooperation (Transmission  

E-Print Network (OSTI)

Pricing in Wireless Networks Peter Marbach Department of Computer Science University of Toronto #12; Model/Terminology A B #15; Routes are Fixed #15; C r : Capacity of Node r #15; U r (x r ): Utility Function of Node r 6 #12; Model/Terminology #15; x r : Transmission Rate of Node r #15; y r

Marbach, Peter

157

Regional Transmission Projects: Finding Solutions  

Science Conference Proceedings (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

158

Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in  

NLE Websites -- All DOE Office Websites (Extended Search)

Honeymoons Honeymoons Lead to Upgrades in Western Vermont to someone by E-mail Share Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Facebook Tweet about Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Twitter Bookmark Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Google Bookmark Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Delicious Rank Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Digg Find More places to share Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on AddThis.com... Better Buildings Residential Network Progress

159

New Applications of Transformerless Voltage Sourced Converters (VSC): Phase Displacement for Upgrading Rights-of-Way  

Science Conference Proceedings (OSTI)

New overhead transmission lines, steady expansion of electric power systems, and reallocation of generation all make it increasingly important to maximize the use of existing rights-of-way (ROWs) in order to increase power transfer capability. It is extremely difficult and costly, however, to remove critical circuits from service long enough to reconductor or replace old circuits with new higher capacity circuits using the same ROW. This report describes new means to allow either type of upgrade ...

2013-06-28T23:59:59.000Z

160

The Advanced Light Source Upgrade  

SciTech Connect

The ALS, a third-generation synchrotron light source at Berkeley Lab, has been operating for almost a decade and is generating forefront science by exploiting the high brightness of a third-generation source in three areas: (1) high resolving power for spectroscopy; (2) high spatial resolution for microscopy and spectromicroscopy; and (3) high coherence for experiments such as speckle. However, the ALS was one of the first third-generation machines to be designed, and accelerator and insertion-device technology have significantly changed since its conception. As a result, its performance will inevitably be outstripped by newer, more advanced sources. To remain competitive and then set a new standard, the performance of the ALS, in particular its brightness, must be enhanced. Substantial improvements in brightness and current have always been feasible in principle, but they incur the penalty of a much reduced lifetime, which is totally unacceptable to our users. Significant brightness improvements can be realized in the core soft x-ray region by going to top-off operation, where injection would be quasi-continuous and the lifetime objections disappear. In top-off mode with higher average current, a reduced vertical emittance and beta function, and small-gap permanent-magnet or superconducting insertion devices, one to two orders of magnitude improvement in brightness can be had in the soft x-ray range. These improvements also extend the high energy range of the undulator radiation beyond the current limit of 2000 eV. Descriptions of the upgrade and the important new science achievable are presented.

Chemla, Daniel S.; Feinberg, Benjamin; Hussain, Zahid; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson, Arthur L.; Smith, Neville V.

2003-11-04T23:59:59.000Z

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Current conflicts in U.S. Electric transmission planning, cost allocation and renewable energy policies: More heat than light?  

Science Conference Proceedings (OSTI)

To surmount obstacles to expanding and upgrading the nation's transmission system that are impeding development of the renewables sector, it is critical that these issues be resolved quickly and on a consistent rather than ad hoc basis. (author)

Bloom, David; Forrester, J. Paul; Klugman, Nadav

2010-12-15T23:59:59.000Z

162

Alternative Transmission Technologies for Joint Planning Studies  

Science Conference Proceedings (OSTI)

This report describes a detailed analysis of joint transmission planning needs and capabilities, including an assessment of current research in the area. The report has value as a starting point and reference for transmission planners engaged in joint planning exercises because it focuses on technologies that could facilitate joint transmission planning of a bulk power grid. A joint planning exercise involves the collaboration of multiple transmission planning groups that may each have ...

2013-12-09T23:59:59.000Z

163

Upgrade and Repair Your PC  

Science Conference Proceedings (OSTI)

From the Publisher:More PC for less $$$! Whether you have the latest,state-of-the-art computer equipment or a 286/386/486 workhorse,here's a book that will help you improve your machine and save a bundle. No,you don't need to be a computer genius. Its ...

Aubrey Pilgrim

1997-10-01T23:59:59.000Z

164

Upgrade and Repair Your PC  

Science Conference Proceedings (OSTI)

From the Publisher:More PC for less $$$! Whether you have the latest,state-of-the-art computer equipment or a 286/386/486 workhorse,here's a book that will help you improve your machine and save a bundle. No,you don't need to be a computer genius. Its ...

Aubrey Pilgrim

1997-11-01T23:59:59.000Z

165

Instrumentation upgrades for the Macromolecular Crystallography beamlines  

NLE Websites -- All DOE Office Websites (Extended Search)

Instrumentation upgrades for the Macromolecular Crystallography beamlines Instrumentation upgrades for the Macromolecular Crystallography beamlines of the Swiss Light Source Monday, October 29, 2012 - 2:00am SSRL, Bldg. 137, Rm. 322 Martin Fuchs, MX Group, Swiss Light Source; Paul Scherrer Institute (Villigen, Switzerland) A new unified diffractometer - the D3 - has been developed for the three MX beamlines. The first of the instruments is in general user operation at beamline X10SA since April 2012. The varied demands from both challenging academic research projects as well as high throughput industrial applications on today's macromolecular crystallography beamlines drive developments to both endstations and beamline optics. Recent instrumentation upgrades to the macromolecular crystallography (MX) beamlines of the Swiss Light Source therefore aimed to

166

HERA Upgrade Project | Superconducting Magnet Division  

NLE Websites -- All DOE Office Websites (Extended Search)

HERA Upgrade Project HERA Upgrade Project As part of the HERA luminosity upgrade, 6 superconducting Interaction Region quadrupoles were delivered, accepted, and are in service. These 6 layer magnets were designed to include the main quadrupole focus, a skew quad, a normal and skew dipole, and a final sextupole layer. Because of the physical space constraints imposed by the existing detector region components, the DESY magnets were of necessity designed to be very compact. In addition, they are also are required to operate within the solenoidal detector fields at the collision points, so all construction materials had to be non magnetic. Two types of DESY magnets were fabricated. The first, designated as G0, was a two meter long, constant radius magnet. The second, designated GG, is a

167

ATLAS upgrade June09_v3  

NLE Websites -- All DOE Office Websites (Extended Search)

ATLAS efficiency and intensity upgrade ATLAS efficiency and intensity upgrade Guy Savard and Robert V. F. Janssens June 12, 2009 The ATLAS facility is on a constant quest to improve and increase the capabilities it offers to its Users. ATLAS currently provides beams of essentially all stable isotopes at energies in the vicinity of the Coulomb barrier. These can be used in conjunction with a suite of state-of-the-art instruments such as Gammasphere, the Fragment Mass Analyzer (FMA), the Canadian Penning Trap mass spectrometer (CPT), the split-pole spectrograph, an in-flight radioactive beam line, and the recently commissioned HELIOS spectrometer. At present, these capabilities are being augmented by (1) the addition of the CARIBU upgrade, which will provide low-intensity, neutron-rich radioactive beams from Californium fission fragments in both low-energy and re-

168

Airspace: Antarctic Sound Transmission  

E-Print Network (OSTI)

Antarctic Sound Transmission Andrea Polli Director,investigates how sound transmission can contribute to thePoles. How have such transmission-based projects developed

Polli, Andrea

2009-01-01T23:59:59.000Z

169

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

170

Transmission Reliability | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

171

Upgrading of light Fischer-Tropsch products  

SciTech Connect

Work during this quarter concentrated on Task 4 of the study. The objective of this task is to evaluate the application of the UOP/BP Cyclar* process to the upgrading of Fischer-Tropsch LPG products into aromatics. Results from pilot plant studies were translated into commercial yield estimates as described in Quarterly Report No. 7. This quarterly report documents an economic evaluation of the Cyclar process for converting LPG into aromatics in a Fischer-Tropsch upgrading complex. 1 ref., 11 figs., 9 tabs.

1989-07-11T23:59:59.000Z

172

Energy Upgrade of the Siam Photon Source  

SciTech Connect

The energy upgrade of the storage ring is part of the plans to develop x-ray production capability of the Siam Photon Source. Simulations have been carried out. The bending magnet power supply has been replaced. Energy of the injected 1 GeV beam from the injector is then ramped up 20% in the storage ring. Studies for modification of bending magnet poles have been done to evaluate possibility of further increasing the beam energy to 1.4 GeV in the future. Studies of the energy upgrade plan and details of energy ramping process, together with beam measurements are presented.

Rugmai, S.; Rujirawat, S. [National Synchrotron Research Center, P.O. Box 93, Nakhon Ratchasima, 30000 (Thailand); School of Physics, Suranaree University of Technology, 111 University Avenue, Muang Distrct, Nakhon Ratchasima, 30000 (Thailand); Hoyes, G. G.; Prawanta, S.; Kwankasem, A.; Siriwattanapitoon, S.; Suradet, N.; Pimol, P.; Junthong, N.; Boonsuya, S.; Janpuang, P.; Prawatsri, P.; Klysubun, P. [National Synchrotron Research Center, P.O. Box 93, Nakhon Ratchasima, 30000 (Thailand)

2007-01-19T23:59:59.000Z

173

Program Finds Unique Way to Fund Energy Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Finds Unique Way to Fund Energy Upgrades Program Finds Unique Way to Fund Energy Upgrades Program Finds Unique Way to Fund Energy Upgrades May 4, 2010 - 11:11am Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE The $40 million of Recovery Acts funds used for weatherizing more than 6,500 homes over the next two years in Arkansas is a welcomed boost, but Martha Jane Murray of the Clinton Foundation is thinking bigger. "How do we create a more robust delivery system that is not just relying on federal dollars," asks Martha Jane, the program director for the foundation's Arkansas Clinton Climate Initiative (CCI AR). For CCI AR, one answer is the Home Energy Affordability Loan, or HEAL, program. In a unique approach to help chip away at the list of homes in need of weatherization and lower industrial energy consumption, CCI AR developed a

174

LHC luminosity upgrade with large Piwinski angle scheme: a recent look  

Science Conference Proceedings (OSTI)

Luminosity upgrade at the LHC collider using longitudinally flat bunches in combination with the large crossing angle (large Piwinski angle scheme) is being studied with renewed interest in recent years. By design, the total beam-beam tune shift at the LHC is less than 0.015 for two interaction points together. But the 2010-11 3.5 TeV collider operation and dedicated studies indicated that the beam-beam tune shift is >0.015 per interaction point. In view of this development we have revisited the requirements for the Large Piwinski Angle scheme at the LHC. In this paper we present a new set of parameters and luminosity calculations for the desired upgrade by investigating: (1) current performance of the LHC injectors, (2) e-cloud issues on nearly flat bunches and (3) realistic beam particle distributions from longitudinal beam dynamics simulations. We also make some remarks on the needed upgrades on the LHC injector accelerators.

Bhat, C.M.; /Fermilab; Zimmermann, f.; /CERN

2011-09-01T23:59:59.000Z

175

Energy Upgrades to Save Small Arizona Town Big Money | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Upgrades to Save Small Arizona Town Big Money Energy Upgrades to Save Small Arizona Town Big Money July 19, 2010 - 1:00pm Addthis An aerial shot of Oro Valley, Ariz.'s town...

176

Better Buildings Neighborhood Program: Energy Upgrade California Drives  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Upgrade Energy Upgrade California Drives Demand From Behind the Wheel to someone by E-mail Share Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Facebook Tweet about Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Twitter Bookmark Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Google Bookmark Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Delicious Rank Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Digg Find More places to share Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on

177

Missouri Water Treatment Plant Upgraded | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Treatment Plant Upgraded Missouri Water Treatment Plant Upgraded July 13, 2010 - 11:30am Addthis The high service pumps at the St. Peters Water Treatment Plant are almost 30...

178

How to Save Energy, Money with Home Energy Upgrades | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

How to Save Energy, Money with Home Energy Upgrades How to Save Energy, Money with Home Energy Upgrades November 1, 2013 - 4:38pm Addthis Tammara Thayer thanks Steve Lemaire (left)...

179

NSTX Upgrade Armor Plate Backing Plate  

E-Print Network (OSTI)

NSTX Upgrade Armor Plate Backing Plate NSTXU-CALC-24-02-00 Rev 0 February 17, 2011 Prepared By # NSTXU_CALC-24-02-00 Revision # 00 WP #: 1508 (ENG-032) Purpose of Calculation: 1.) To qualify the Armor backing plate calculation 2.) Build and evaluate a Finite Element Model for The Armor Eddy Current

Princeton Plasma Physics Laboratory

180

Upgrade of a Scara robot using Orocos  

Science Conference Proceedings (OSTI)

This paper presents a bottom-up approach that permits the integration of new devices and functionalities into a robotic cell. Although there are currently notable efforts from the scientific community toward this goal, the initiative presented here combines ... Keywords: Orocos, RTAI, free software, real time systems, robot design and architecture, robot upgrade

Dalton Matsuo Tavares; Rafael Vidal Aroca; Glauco Augusto de Paula Caurin

2007-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

MR LLRF VXI upgrade beam study period  

Science Conference Proceedings (OSTI)

AD/RFI/LLRF group personnel performed several studies with the MR LLRF VXI upgrade system during the evening of 7/29/95. The study period lasted about 4 hours. The MR operating conditions were a mixture of $29 and $2B cycles, with beam injected only on the $29. The author believes the $2B cycles were present for reasons unrelated to the study. The basic study period goal was to test the initial VXI version of MR LLRF finite state machine (FSM) execution. This goal represents what has been called MR LLRF VXI Upgrade Implementation Stage No.2 throughout presentations and documentation on the upgrade project. The test includes control of MR LLRF NIM hardware, the MR RF cavities, and beam via XVI TTL FSM outputs. Numerous MR LLRF VXI system objects, or components, must work together correctly for a successful test. Very briefly, the required objects include VXI Front End hardware, the ACNET/Front End interface code, and the VXI/NIM Interface chassis (the chassis solves VXI-CAMAC-NIM RF and FSM output connectivity and development problems). Though this initial FSM does not yet fully support Upgrade Implementation Stage 2 functionality, all code and hardware for the following basic functionality is tested.

Mesiner, K.; /Fermilab

1995-01-01T23:59:59.000Z

182

CMS: Present status, limitations, and upgrade plans  

SciTech Connect

An overview of the CMS upgrade plans will be presented. A brief status of the CMS detector will be given, covering some of the issues we have so far experienced. This will be followed by an overview of the various CMS upgrades planned, covering the main motivations for them, and the various R&D efforts for the possibilities under study. The CMS detector has been working extremely well since the start of data-taking at the LHC as is evidenced by the numerous excellent results published by CMS and presented at this workshop and recent conferences. Less well documented are the various issues that have been encountered with the detector. In the spirit of this workshop I will cover some of these issues with particular emphasis on problems that motivate some of the upgrades to the CMS detector for this decade of data-taking. Though the CMS detector has been working extremely well and expectations are great for making the most of the LHC luminosity, there have been a number of issues encountered so far. Some of these have been described and while none currently presents a problem for physics performance, some of them are expected to become more problematic, especially at the highest Phase 1 luminosities for which the majority of the integrated luminosity will be collected. These motivate upgrades for various parts of the CMS detector so that the current excellent physics performance can be maintained or even surpassed in the realm of the highest Phase 1 luminosities.

Cheung, H.W.K.; /Fermilab

2011-09-01T23:59:59.000Z

183

The BABAR Detector: Upgrades, Operation and Performance  

E-Print Network (OSTI)

The BABAR detector operated successfully at the PEP-II asymmetric e+e- collider at the SLAC National Accelerator Laboratory from 1999 to 2008. This report covers upgrades, operation, and performance of the collider and the detector systems, as well as the trigger, online and offline computing, and aspects of event reconstruction since the beginning of data taking.

The BABAR Collaboration

2013-05-15T23:59:59.000Z

184

UPGRADES TO Monteburns, VERSION 3.0  

SciTech Connect

Monteburns VERSION 3.0 is an upgrade of the existing Monteburns code available through RSICC. The new version includes modern programming style, increased parallel computing, more accurate capture gamma calculations and an automated input generator. This capability was demonstrated through a small PWR core simulation.

Galloway, Jack D [Los Alamos National Laboratory; Trellue, Holly R [Los Alamos National Laboratory

2012-06-22T23:59:59.000Z

185

Guidelines for Home Energy Upgrade Professionals: Standard Work Specifications for Multifamily Energy Upgrades (Fact Sheet)  

Science Conference Proceedings (OSTI)

This fact sheet provides essential information about the 2011 publication of the Workforce Guidelines for Multifamily Home Energy Upgrades, including their origin, their development with the help of industry leaders to create the standard work specifications for retrofit work.

Not Available

2011-08-01T23:59:59.000Z

186

THERMAL UPGRADING OF 9977 RADIOACTIVE MATERIAL (RAM) TYPE B PACKAGE  

Science Conference Proceedings (OSTI)

The 9977 package is a radioactive material package that was originally certified to ship Heat Sources and RTG contents up to 19 watts and it is now being reviewed to significantly expand its contents in support of additional DOE missions. Thermal upgrading will be accomplished by employing stacked 3013 containers, a 3013 aluminum spacer and an external aluminum sleeve for enhanced heat transfer. The 7th Addendum to the original 9977 package Safety Basis Report describing these modifications is under review for the DOE certification. The analyses described in this paper show that this well-designed and conservatively analyzed package can be upgraded to carry contents with decay heat up to 38 watts with some simple design modifications. The Model 9977 package has been designed as a replacement for the Department of Transportation (DOT) Fissile Specification 6M package. The 9977 package is a very versatile Type B package which is certified to transport and store a wide spectrum of radioactive materials. The package was analyzed quite conservatively to increase its usefulness and store different payload configurations. Its versatility is evident from several daughter packages such as the 9978 and H1700, and several addendums where the payloads have been modified to suit the Shipper's needs without additional testing.

Gupta, N.; Abramczyk, G.

2012-03-26T23:59:59.000Z

187

Financing; A Cost Effective Alternative When Upgrading Energy Efficient Systems  

E-Print Network (OSTI)

In the 1990's, many organizations are attempting to do more, faster, with less cost and improved quality. In many cases, this involves improving the efficiency of their systems. Increased competition is creating pressure to continuously improve in order to effectively compete in the marketplace. One obvious method of reducing costs and improving productivity is to upgrade old, antiquated equipment such as lighting to more modern energy efficient systems. Most projects provide a return on investment to the owner in several years, through energy and demand savings, Power Utility rebates, maintenance savings and increased productivity, however, the initial capital expense required is cost prohibitive. Budget constraints, a lengthy and complicated approval process and large up-front capital requirements are only a few "road blocks" to improvement. In order to make an equipment acquisition, every company must consider how they will pay for it! How do companies acquire the equipment they need to be more competitive? One cost effective solution -FINANCING! There are numerous benefits to both the end user customer (Lessee) and the installing contractor from utilizing financing to upgrade or retrofit to energy efficient systems. It is possible to provide design, material, installation, maintenance and soft costs as well as positive cash flow to the end user by structuring financing terms and payments around the energy savings. A wide array of programs and services are offered by many different financial organizations.

Ertle, J. M.

1994-04-01T23:59:59.000Z

188

Financing Energy Upgrades for K-12 School Districts  

NLE Websites -- All DOE Office Websites (Extended Search)

Financing Energy Upgrades for K-12 School Districts Financing Energy Upgrades for K-12 School Districts Page 2 Table of Contents Introduction................................................................................................................................................................................................................... 4 What This Guide Covers .................................................................................................................................................................................. 6 Chapter 1: Principles of Financing Energy Upgrades for Schools .................................................................................................. 7 Principle 1. Start with Clear Project Objectives.......................................................................................................................................... 7

189

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

190

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

191

Hydromechanical transmission  

DOE Patents (OSTI)

A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

Orshansky, Jr. deceased, Elias (LATE OF San Francisco, CA); Weseloh, William E. (San Diego, CA)

1978-01-01T23:59:59.000Z

192

Bulk Power Transmission Study  

E-Print Network (OSTI)

"Texans now have a choice. We can become more efficient and maintain our standard of living, or we can continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled, the extensive natural gas pipeline network moved energy easily within the state. In recent years two things have changed: 1. Electric utilities have made extensive investment in lignite, coal, and nuclear plants and, 2. Improvements in gas turbine technology and the removal of institutional barriers has encouraged cogeneration at many of our energy intensive process industries. This energy diversity means that there are now significant differences in energy costs between units. The variable costs of generation of power can vary between units by a ratio of 2 or 3 to 1 and this difference will be accentuated when energy costs rise (and they will; it’s a question of when, not if). The potential for costs savings by optional dispatching of the entire interconnected system are greater than ever before as demonstrated by the PUC's Bulk Power Transmission Study. And the potential can be enhanced with added transmission system investment. Cogeneration and small power production has proven to be the most cost effective way for Texas to add additional generating capacity needed to supply an economy that is starting to rebound and to replace old, obsolete power plants. The freedom to locate these facilities at the fuel source or at the site of large thermal demand makes real economic and environmental sense. The use of renewable or waste fuels allows something that would otherwise be wasted to contribute to our economy. Fossil fuels that are displaced can be redirected to another use or consumed for future benefit. By integrating a gas turbine generator with a. process plant, the natural gas required for producing electricity can be reduced by 40% below that required for a combined cycle. The heat rejected from a gas turbine, combined cycle, or steam plant can be redirected to a process use that contributes to our economy by producing something of value to world markets. By contrast a conventional power plant is paid for by the rate payers and consumes Texas natural resources and therefore is a burden rather than an enhancement to our economy. The optimal location of facilities are possible only if there is an adequate transmission system. Utility, consumer and industry must cooperate to improve our transmission system for the benefit of all Texas. The Texas Public Utilities Commission has taken the lead in promoting efficiency by requiring transmission wheeling between qualifying facilities and electric utilities. Several cogeneration facilities have been constructed as a result. In order to encourage small power production, the rule needs to be expanded to include projects interconnected with distribution systems. Most renewable resource projects are relatively small and cannot afford the cost of a high voltage interconnect, and yet their characteristics match a baseload need. The ability to wheel power to a utility that needs base load power from a distribution level interconnection is essential to development of these smaller projects."

John, T.

1988-09-01T23:59:59.000Z

193

Integrating Wind into Transmission Planning: The Rocky Mountain Area Transmission Study (RMATS): Preprint  

DOE Green Energy (OSTI)

Plans to expand the western grid are now underway. Bringing power from low-cost remote resources--including wind--to load centers could reduce costs for all consumers. But many paths appear to be already congested. Locational marginal price-based modeling is designed to identify the most cost-effective paths to be upgraded. The ranking of such paths is intended as the start of a process of political and regulatory approvals that are expected to result in the eventual construction of new and upgraded lines. This paper reviews the necessary data and analytical tasks to accurately represent wind in such modeling, and addresses some policy and regulatory issues that can help with wind integration into the grid. Providing wind fair access to the grid also (and more immediately) depends on tariff and regulatory changes. Expansion of the Rocky Mountain Area Transmission Study (RMATS) study scope to address operational issues supports the development of transmission solutions that enable wind to connect and deliver power in the next few years--much sooner than upgrades can be completed.

Hamilton, R.; Lehr, R.; Olsen, D.; Nielsen, J.; Acker, T.; Milligan, M.; Geller, H.

2004-03-01T23:59:59.000Z

194

Accounting-related transmission issues  

Science Conference Proceedings (OSTI)

Various initiatives have been undertaken by the Federal Energy Regulatory Commission (FERC) to deregulate wholesale electric energy markets. These initiatives have focused on restructuring the transmission systems in the US and recently have culminated in a proposal requiring formation of and participation in regional transmission organizations. The overall form of regulation selected to determine rates for transmission entities as well as underlying regulatory decisions reached on key issues will have profound implications for transmission entities. For example, traditional cost-based regulation would require one set of accounting and reporting rules, while incentive-based regulation may not be subject to those same rules. An overview of some of the major accounting and financial reporting issues that will need to be considered is presented.

Niehaus, M.; Bjorn, P.; Pate, G.

1999-12-01T23:59:59.000Z

195

The Use of TaBoRR as a Heavy Oil Upgrader  

SciTech Connect

Preliminary testing has shown that Western Research Institute's (WRI) Tank Bottom Recovery and Remediation (TaBoRR{reg_sign}) technology shows promise for heavy oil upgrading. Approximately 70 to 75 wt% of a Canadian Cold Lake bitumen feed was converted to a partially upgraded overhead product that could be transported directly by pipeline or blended with the parent bitumen to produce transportable crude. TaBoRR{reg_sign} was originally developed to remediate tank bottom wastes by producing a distillate product and solid waste. TaBoRR{reg_sign}'s processing steps include breaking a water-oil emulsion, recovering a light hydrocarbon fraction by distillation in a stripper unit, and pyrolyzing the residua reducing it to additional overhead and a benign coke for disposal. Cold Lake bitumen was tested in WRI's bench-scale equipment to evaluate the potential use of TaBoRR{reg_sign} technology for heavy oil upgrading to produce a stable, partially (or fully) upgraded product that will allow diluent-reduced or diluent-free transportation of bitumen or ultra-heavy crudes to market. Runs were conducted at temperatures of low, intermediate and high severity in the stripper to produce stripper overhead and bottoms. The bottoms from each of these runs were processed further in a 6-inch screw pyrolyzer to produce pyrolyzer overhead for blending with the corresponding stripper overheads. Proceeding in this fashion yielded three partially upgraded crudes. The products from TaBoRR{reg_sign} processing, the parent bitumen, and bitumen blends were subjected to stability and compatibility testing at the National Centre for Upgrading Technology (NCUT). Chemical analyses of the overhead product blends have met pipeline specifications for viscosity and density; however the bromine number does not, which might indicate the need for mild hydrotreating. Storage stability tests showed the blends to be stable. The blends were also soluble and compatible with most other Alberta crudes.

Lee Brecher; Charles Mones

2009-02-05T23:59:59.000Z

196

Switchyards Rebuild and Upgrade Project in Mohave County, Arizona  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . Categorical Exclusion for the Demolition of a Service Building at Davis Dam Lower 230-kV Switchyard as part of the Overall Switchyards Rebuild and Upgrade Project in Mohave County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western Area Power Administration (Western) plans to demolish a service building located in the Lower 230-kV Switchyard at Davis Dam, because it no longer meets our needs and we do not anticipate finding a use for it in the future. The building is currently vacant and has been for years. We plan to begin the work on April 1 ,2011 and complete it by December 31,2011. The attached map shows the project area location. Aerial photographs show that much of this area is developed. Western owns the land. The legal description is

197

Microsoft PowerPoint - ATLAS_upgrade_physics_program  

NLE Websites -- All DOE Office Websites (Extended Search)

Guy Savard Guy Savard Argonne National Laboratory and University of Chicago Science with the ATLAS Efficiency and Intensity Upgrade ATLAS Users Meeting August 8-9 2009 2 G. Savard 2009 ATLAS S&T Review May 18-19, 2009 Outline Evolving landscape for low-energy nuclear physics Self-assessment of ATLAS present and near future program Process followed to evaluate near and longer term physics program needs and role in community Option proposed - Physics - Machine - Instrumentation 3 G. Savard 2009 ATLAS S&T Review May 18-19, 2009 The new landscape: what is coming to a town near us ---- FRIB ---- At full power - Fast beams - Reaccelerated beams at a few % of that Starts operating ~ 2017-18

198

ATU Advanced Technology Upgrading Ltd | Open Energy Information  

Open Energy Info (EERE)

ATU Advanced Technology Upgrading Ltd ATU Advanced Technology Upgrading Ltd Jump to: navigation, search Name ATU (Advanced Technology Upgrading) Ltd Place Israel Product Focused on development of rechargeable magnesium battery. References ATU (Advanced Technology Upgrading) Ltd[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. ATU (Advanced Technology Upgrading) Ltd is a company located in Israel . References ↑ "ATU (Advanced Technology Upgrading) Ltd" Retrieved from "http://en.openei.org/w/index.php?title=ATU_Advanced_Technology_Upgrading_Ltd&oldid=342420" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version

199

An Upgrade for the Advanced Light Source  

SciTech Connect

One of the first third-generation synchrotron light sources, the ALS, has been operating for almost a decade at Berkeley Lab, where experimenters have been exploiting its high brightness for forefront science. However, accelerator and insertion-device technology have significantly changed since the ALS was designed. As a result, the performance of the ALS is in danger of being eclipsed by that of newer, more advanced sources. The ALS upgrade that we are planning includes full-energy, top-off injection with higher storage-ring current and the replacement of five first-generation insertion devices with nine state-of-the art insertion devices and four new application-specific beamlines now being identified in a strategic planning process. The upgrade will help keep the ALS at the forefront of soft x-ray synchrotron light sources for the next two decades.

Chemla, Daniel S.; Feinberg, Benedict; Hussain, Zahid; Kirz,Janos; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson,Arthur L.; Smith, Neville V.

2004-08-05T23:59:59.000Z

200

JEFFERSON LAB 12 GEV CEBAF UPGRADE  

Science Conference Proceedings (OSTI)

The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at approx6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

Rode, C. H. [Thomas Jefferson National Accelerator Facility, Newport News, Virginia, 23606 (United States)

2010-04-09T23:59:59.000Z

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

CHALLENGES FOR THE SNS RING ENERGY UPGRADE  

Science Conference Proceedings (OSTI)

The Oak Ridge Spallation Neutron Source accumulator ring presently operates at a beam power of about 1 MW with a beam energy of about 910 MeV. A power upgrade is planned to increase the beam energy to 1.3 GeV. For the accumulator ring this mostly involves modifications to the injection and extraction sections. A variety of modifications to the existing injection section were necessary to achieve 1 MW, and the tools developed and the lessons learned from this work are now being applied to the design of the new injection section. This paper will discuss the tools and the lessons learned, and also present the design and status of the upgrades to the accumulator ring.

Plum, Michael A [ORNL; Gorlov, Timofey V [ORNL; Holmes, Jeffrey A [ORNL; Hunter, W Ted [ORNL; Roseberry, Jr., R Tom [ORNL; Wang, Jian-Guang [ORNL

2012-01-01T23:59:59.000Z

202

Idaho Chemical Processing Plant product denitrator upgrade  

SciTech Connect

The uranium product denitrator at the Idaho Chemical Processing Plant has had serious operating problems since 1970, including inadequate contamintion control, fluidized bed caking, frequent bed heater failure, product overflow plugging, and poor feed control. These problems were minimized through selective redesign and upgrade of the process equipment as part of a process upgrade program completed in March 1981. Following startup and testing of the rebuilt product denitrator, 1044 kg of enriched uranium was processed in three weeks while demonstrating greater reliability, ease of operation, and improved contamination control. To maximize personnel safety in the future, the denitrator vessel should be made critically safe by geometry and process instrumentation isolated from the process for semi-remote operation.

Rindfleisch, J.A.; Durst, P.C.; Dahl, C.A.; Casterline, C.E.; Petig, A.V.

1982-05-01T23:59:59.000Z

203

Upgrade of the Proton West secondary beamline  

SciTech Connect

As originally designed and operated, protons entering PW6 were steered by a series of EPB dipoles into a single interaction length beryllium target, some 43 feet from the enclosure wall. Ensuing secondary beams, either p{sup +}/{pi}{sup +} or p{sup -}/{pi}{sup -}, were collected by a string of quadrupoles following the target, steered westward, away from the Proton Center line, through PW6 and PW7, and ultimately focussed on experiment production targets located within the large PW8 hall. Around the Spring of 1988 it was decided to upgrade the existing Proton West secondary beamline to allow for transport of a primary proton beam, anticipated to be either 800 or 900 GeV/c, through PW8. This upgrade project, which is now nearing completion, was largely motivated by the then recent approval of E-771, a hadronic beauty production experiment located in PW8. E-771 represents the third in a series of experiments for the large-acceptance dimuon spectrometer presently located at the end of the Proton West beamline. This Technical Memo is a summary of the upgrade --- an explanation of the underlying strategy and a documentation of the final locations of the secondary beamline elements. 6 refs., 2 figs., 2 tabs.

Spiegel, L.

1989-10-10T23:59:59.000Z

204

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

205

NWCC Transmission Case Study III  

DOE Green Energy (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

206

Overhead Transmission Inspection and Assessment Guidelines -- 2011  

Science Conference Proceedings (OSTI)

The emphasis within the transmission arena has shifted from designing and building new transmission facilities to optimizing the use, performance, and life of existing facilities. In the early 1990s, EPRI established an initiative to examine the capabilities and limitations of existing inspection and assessment methods and technology. One of the key needs identified was information on methods and technologies for inspecting/assessing the conditions and life expectancy of overhead transmission line compon...

2011-12-23T23:59:59.000Z

207

Overhead Transmission Inspection and Assessment Guidelines - 2012  

Science Conference Proceedings (OSTI)

The emphasis within the transmission arena has shifted from designing and building new transmission facilities to optimizing the use, performance, and life of existing facilities. In the early 1990s, EPRI established an initiative to examine the capabilities and limitations of existing inspection and assessment methods and technology. One of the key needs identified was information on methods and technologies for inspecting/assessing the conditions and life expectancy of overhead transmission line ...

2012-12-20T23:59:59.000Z

208

Strategic Intelligence & Technology Watch Newsletter for Transmission Losses  

Science Conference Proceedings (OSTI)

Adequate transmission capacity is key to overall grid reliability and proper functioning of electricity markets. However, building new transmission infrastructure is more difficult than ever. Increasing the efficiency of existing transmission systems, and integrating energy efficiency and demand response as part of the overall transmission planning process, could defer the need for new transmission infrastructure and reduce the CO2 footprint of the electricity sector. Utilities are under increasing press...

2008-12-23T23:59:59.000Z

209

Testing Needs for ITER ECH Transmission Line Components (A25513)  

E-Print Network (OSTI)

Proc. Of 31st International Conference On Infrared And Millimeter Waves And 14th International Conference On Terahertz Electronics, Shanghai, PR China, 2006; To Be Published In The Proceedings31st International Conference on Infrared and Millimeter Waves Shanghai, CN, 2006999611605

Olstad, R.A.

2006-06-30T23:59:59.000Z

210

Transmission Investment: Nourishing a Gnarly Tree  

Science Conference Proceedings (OSTI)

The Federal Energy Regulatory Commission needs to create a proper framework for investors to weigh the economic viability of transmission projects, then step aside. That means allowing investors and utilities to enter into more varied business models, while maintaining the integrity of the stand-alone transmission business.

Renner, Stein B.

2005-09-01T23:59:59.000Z

211

Microsoft Word - CX-DrainageUpgradesMultipleSubsFY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2012 , 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: FY13 Environmental Drainage Upgrades at Bonneville Power Administration's (BPA) Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl, and Wren substations Budget Information: Work Order #: 00004952 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities Location: Substation County, State Township, Range, Section Clatsop Clatsop County, Oregon Township 8 North, Range 9 West, Section 30 Garrison Powell County, Montana Township 9 North, Range 10 West, Section 20 Lexington Cowlitz County, Washington Township 8 North, Range 2 West, Section 15

212

4 MW fast wave current drive upgrade for DIII-D  

SciTech Connect

The DIII-D program has just completed a major addition to its ion cyclotron range of frequency (ICRF) systems. This upgrade project added two new fast wave current drive (FWCD) systems, with each system consisting of a 2 MW, 30 to 120 MHz transmitter, ceramic insulated transmission lines and tuner elements, and water-cooled four-strap antenna. With this addition of 4 MW of FWCD power to the original 2 MW, 30 to 60 MHz capability, experiments can be performed that will explore advanced tokamak plasma configurations by using the centrally localized current drive to effect current profile modifications.

Callis, R.W.; Cary, W.P. [General Atomics, San Diego, CA (United States); Baity, F.W. [Oak Ridge National Lab., TN (United States)] [and others

1994-09-01T23:59:59.000Z

213

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

214

Regulations for Electric Transmission and Fuel Gas Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long...

215

DOE Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop November 1, 2012 Federal Energy Regulatory Commission Commissioner Cheryl LaFleur 1 FERC's Transmission Efforts Reliability and Grid Security Planning...

216

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Usage Transmission Transmission Once electricity is generated -- whether by burning fossil fuels; through nuclear fission; or by harnessing wind, solar, geothermal, or hydro...

217

Merchant transmission investment  

E-Print Network (OSTI)

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

218

County Aims to Save with Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

County Aims to Save with Upgrades County Aims to Save with Upgrades County Aims to Save with Upgrades August 5, 2010 - 6:50pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy Fulton County, Georgia is an example of how large-scale energy upgrades can save local governments millions of dollars and develop a new green workforce. A retrofit program, funded by an $814,300 Energy Efficiency and Conservation Block Grant (EECBG) through the American Recovery and Reinvestment Act, was the topic of a recent video. Under the program, more than a dozen county facilities are being upgraded with equipment such as occupancy sensors, digital thermostats and LED exit signs. County workers will also be trained on how to conduct the upgrades and keep buildings energy efficient.

219

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Improves Upgrading Process for Unconventional Technology Improves Upgrading Process for Unconventional Oil Resources Innovative Technology Improves Upgrading Process for Unconventional Oil Resources April 9, 2013 - 1:57pm Addthis Washington, DC - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology. Heavy oil is crude oil that is viscous and requires thermally enhanced oil

220

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Innovative Technology Improves Upgrading Process for Unconventional Innovative Technology Improves Upgrading Process for Unconventional Oil Resources Innovative Technology Improves Upgrading Process for Unconventional Oil Resources April 9, 2013 - 1:57pm Addthis Washington, DC - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology.

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Energy Efficiency Upgrades: Benefiting Homeowners and the Environment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upgrades: Benefiting Homeowners and the Upgrades: Benefiting Homeowners and the Environment Energy Efficiency Upgrades: Benefiting Homeowners and the Environment May 10, 2013 - 4:37pm Addthis Energy efficient upgrades helped Margie Garmey save money while reducing her impact on the planet. | Photo courtesy of Margie Garmey. Energy efficient upgrades helped Margie Garmey save money while reducing her impact on the planet. | Photo courtesy of Margie Garmey. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs Looking for ways to save energy? Learn how to do a DIY home energy audit to help you identify and prioritize some energy efficiency upgrades. Check out Energy Saver for tips and advice on ways to save energy and money. When Margie Garmey and her partner bought their newly constructed two-story

222

County Aims to Save with Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Aims to Save with Upgrades Aims to Save with Upgrades County Aims to Save with Upgrades August 5, 2010 - 6:50pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy Fulton County, Georgia is an example of how large-scale energy upgrades can save local governments millions of dollars and develop a new green workforce. A retrofit program, funded by an $814,300 Energy Efficiency and Conservation Block Grant (EECBG) through the American Recovery and Reinvestment Act, was the topic of a recent video. Under the program, more than a dozen county facilities are being upgraded with equipment such as occupancy sensors, digital thermostats and LED exit signs. County workers will also be trained on how to conduct the upgrades and keep buildings energy efficient.

223

Upgrade of the ALICE Inner Tracking System  

E-Print Network (OSTI)

The Inner Tracking System (ITS) is the key ALICE detector for the study of heavy flavour production at LHC. Heavy flavor can be studied via the identification of short-lived hadrons containing heavy quarks which have a mean proper decay length in the order of 100-300 $\\mu$m. To accomplish this task, the ITS is composed of six cylindrical layers of silicon detectors (two pixel, two drift and two strip) with a radial coverage from 3.9 to 43 cm and a material budget of 1.1% X0 per layer. %In particular, the properties of the two innermost layers define the ITS performance in measuring the displaced vertex of such short-lived particles. In order to enhance the ALICE physics capabilities, and, in particular, the tracking performance for heavy-flavour detection, the possibility of an ITS upgrade has been studied in great detail. It will make use of the spectacular progress made in the field of imaging sensors over the last ten years as well as the possibility to install a smaller radius beampipe. The upgraded detector will have greatly improved features in terms of: the impact parameter resolution, standalone tracking efficiency at low $p_{t}$, momentum resolution and readout capabilities. The Conceptual Design Report, which covers the design and performance requirements, the upgrade options, as well as the necessary R&D efforts, was made public in September 2012. An intensive R&D program has been launched to review the different technological options under consideration. The new detector should be ready to be installed during the long LHC shutdown period scheduled in 2017-2018.

Stefan Rossegger

2012-11-22T23:59:59.000Z

224

Emergency Diesel Generator Digital Control System Upgrade Requirements  

Science Conference Proceedings (OSTI)

This interim report documents the development of system requirements for a digital control system upgrade to the station emergency diesel generators (EDGs). Operators of nuclear power plants (NPPs) must be able to replace and upgrade equipment in a cost-effective manner while continuing to meet safety and reliability requirements and controlling modification costs. Upgrades to plant equipment—especially instrumentation and control (I&C) systems—typically involve replacement of analog ...

2013-12-18T23:59:59.000Z

225

Methods and apparatuses for preparing upgraded pyrolysis oil  

SciTech Connect

Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

Brandvold, Timothy A; Baird, Lance Awender; Frey, Stanley Joseph

2013-10-01T23:59:59.000Z

226

Upgrade Your Refinery for Energy Conservation  

E-Print Network (OSTI)

Upgrading existing refineries for efficient energy utilization imposes strict restraints upon design engineers. Present and future production requirements must be defined. Reliable operating data must be obtained from historical records and test runs to accurately define actual performance of each piece of equipment. A complete simulation model of the facility is developed and tested. Future operations are evaluated using the model to define heat and material balance requirements for all projected operations. Energy conservation projects are evaluated with the model to define energy savings over the life of each project. A discounted cash flow analysis is formulated and an optimum set of projects yielding maximum rates of return are selected for implementation.

Johnnie, D. H., Jr.; Klooster, H. J.

1983-01-01T23:59:59.000Z

227

The value of steam turbine upgrades  

Science Conference Proceedings (OSTI)

Technological advances in mechanical and aerodynamic design of the turbine steam path are resulting in higher reliability and efficiency. A recent study conducted on a 390 MW pulverized coal-fired unit revealed just how much these new technological advancements can improve efficiency and output. The empirical study showed that the turbine upgrade raised high pressure (HP) turbine efficiency by 5%, intermediate pressure (IP) turbine efficiency by 4%, and low pressure (LP) turbine efficiency by 2.5%. In addition, the unit's highest achievable gross generation increased from 360 MW to 371 MW. 3 figs.

Potter, K.; Olear, D.; [General Physics Corp. (United States)

2005-11-01T23:59:59.000Z

228

N reactor safety upgrades final status report  

Science Conference Proceedings (OSTI)

This document describes the requirements, objectives, work completed, and issues resolved for all safety upgrades recommended by the various expert panels (e.g., Roddis), National Academy of Sciences (NAS), and Westinghouse Independent Safety Appraisal (WISA) team. This report reflects the status of the recommendations at the time of publication, while the reactor is being placed in cold standby. Each recommendation required a resolution, a closure process if closed, and a punchlist reference if open and required for restart. These recommendations are maintained on databases that were updated periodically as work was completed or punchlisted. The databases and files are to be retained with the N Reactor Standby files.

Foreman, S.K.; Rainey, T.E.; Erpenbeck, E.G.

1990-02-01T23:59:59.000Z

229

Economic Options for Upgrading Waste Heat  

E-Print Network (OSTI)

There are at least six major types of equipment that upgrade waste heat: (1) thermocompressor; (2) electric drive compressor heat pump; (3) absorption heat pump; (4) high temperature heat powered compressor heat pump; (5) reverse absorption heat pump; and (6) waste heat driven compressor heat pump. Some of these are not widely known, and there has been a tendency to ascribe the characteristics and limitations of the most well-known member to all members of the group. This paper demonstrates the wide variation that actually exists between the different options, and highlights the considerations necessary to ensure the most economic choice for a particular application.

Erickson, D. C.

1983-01-01T23:59:59.000Z

230

Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

State and local government resources Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy: AstraZeneca - Newark This profiles explains how Astrazeneca's Newark...

231

Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

State and local government resources Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy: Allergan - Westport This profiles explains how Allergan's Westport facility...

232

Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

State and local government resources Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy: Boeing Philadelphia This profiles explains how Beoing's Philadelphia plant...

233

Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

State and local government resources Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy: Cargill Krefeld This profiles explains how Cargill's Krefeld mill saved...

234

Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

State and local government resources Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy: GM Marion & Orion This profiles explains how GM's Marion & Orion facilities...

235

List of Steam-system upgrades Incentives | Open Energy Information  

Open Energy Info (EERE)

upgrades Incentives upgrades Incentives Jump to: navigation, search The following contains the list of 100 Steam-system upgrades Incentives. CSV (rows 1 - 100) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active AlabamaSAVES Revolving Loan Program (Alabama) State Loan Program Alabama Commercial Industrial Institutional Building Insulation Doors Energy Mgmt. Systems/Building Controls Lighting Lighting Controls/Sensors Steam-system upgrades Water Heaters Windows Biodiesel Biomass CHP/Cogeneration Ethanol Fuel Cells using Renewable Fuels Geothermal Electric Hydroelectric energy Landfill Gas Photovoltaics Renewable Fuels Solar Water Heat Commercial Refrigeration Equipment Natural Gas Yes Ameren Missouri (Gas) - Business Energy Efficiency Program (Missouri) Utility Rebate Program Missouri Commercial

236

EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Sites Power Marketing Administration Other Agencies You are here Home EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho...

237

Income Tax Deduction for Energy Efficiency Upgrades (Idaho) ...  

Open Energy Info (EERE)

Facebook icon Twitter icon Income Tax Deduction for Energy Efficiency Upgrades (Idaho) This is the approved revision of this page, as well as being the most recent. Jump...

238

Energy Upgrade Program Revitalizing Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Act. The program tapped nonprofit Energy Trust of Oregon to provide free energy audits for the participating businesses. Two-year payback When the energy upgrades are...

239

SRI2013 | Workshop 3 - Facility Upgrades and High ...  

Science Conference Proceedings (OSTI)

... 11:45 — 12:15, Christoph Steier (LBNL) DL-ALS, a potential soft x-ray, diffraction-limited upgrade of the Advanced Light Source. ...

240

Energy Upgrades Pay Off for Taxpayers and Feds  

Science Conference Proceedings (OSTI)

... savings from the energy upgrades, based on 2007 energy prices, came to ... software to figure in a three percent annual energy price escalation rate. ...

2011-07-19T23:59:59.000Z

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

EA-1190: Wastewater Treatment Capability Upgrade, Amarillo, Texas  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts for the proposed upgrade of the U.S. Department of Energy Pantex Plant Wastewater Treatment Plant in Amarillo, Texas.

242

NERSC's Franklin Supercomputer Upgraded to Double Its Scientific...  

NLE Websites -- All DOE Office Websites (Extended Search)

system. The Department of Energy's (DOE) National Energy Research Scientific Computing (NERSC) Center has officially accepted a series of upgrades to its Cray XT4 supercomputer,...

243

ENERGY STAR Building Upgrade Manual Chapter 11: Supermarkets...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 11: Supermarkets and Grocery Stores The Building...

244

ENERGY STAR Building Upgrade Manual Chapter 1: Introduction ...  

NLE Websites -- All DOE Office Websites (Extended Search)

STAR Building Upgrade Manual Chapter 1: Introduction Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings...

245

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the...

246

ENERGY STAR Building Upgrade Manual Chapter 2: Benchmarking ...  

NLE Websites -- All DOE Office Websites (Extended Search)

efficiency upgrades presented in an easy-to-understand framework designed especially for ENERGY STAR partners. This 12-page chapter defines benchmarking, what successful...

247

ALS control system IP I/O module upgrade  

E-Print Network (OSTI)

the Fast Orbit Feedback at the ALS, Proceedings of PAC 2003,ALS Control System IP I/O Module Upgrade* J. M . Weber, M .

Weber, Jonah M.; Chin, Michael

2004-01-01T23:59:59.000Z

248

Community based outreach strategies in residential energy upgrade programs  

E-Print Network (OSTI)

Home energy upgrades can reduce residential energy consumption and improve indoor conditions, thereby realizing environmental, economic, health and other social benefits. Utilities, government and other actors have established ...

McEwen, Brendan (Brendan Carl Francis)

2012-01-01T23:59:59.000Z

249

Sandia upgrades hardware for NNSA training course | National...  

National Nuclear Security Administration (NNSA)

upgrades hardware for NNSA training course | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

250

Ribbon cutting marks chemistry laboratory upgrades at Northern...  

NLE Websites -- All DOE Office Websites (Extended Search)

November 2013 Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico College Community Connections: Our link to Northern New Mexico Communities Latest...

251

Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades...  

NLE Websites -- All DOE Office Websites (Extended Search)

Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades in Record Time The Better Buildings Neighborhood Program is part of the national Better Buildings Initiative led by...

252

Midwest Transmission Workshop III Summary  

DOE Green Energy (OSTI)

OAK-B135 On March 12-13, 2002, the National Wind Coordinating Committee (NWCC), in cooperation with regional stakeholders, held a two-day workshop: Planning for Electrical Transmission Needs in the Upper Midwest. The workshop was the outgrowth of an effort to develop a forum and process for consideration of transmission options that strives for equitable allocation of benefits and impacts among all affected parties. The goal of this workshop was to provide a catalyst for an enhanced, inclusive process for transmission planning with participation of and acceptance by all affected stakeholders. Participants in the meeting included representatives of state and regional regulatory agencies, utilities and power generators, the wind industry, environmental and landowner interests, and other interested parties (see Attachment A for a list of meeting participants).

Kevin Bryan

2003-03-12T23:59:59.000Z

253

DOE/EA-1247; Environmental Assessment for Electrical Power System Upgrades at Los Alamos National Laboratory (03/09/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

47 47 Environmental Assessment for Electrical Power System Upgrades at Los Alamos National Laboratory Los Alamos, New Mexico Final Document Date Prepared: March 9, 2000 Prepared by: U.S. Department of Energy, Los Alamos Area Office Final EA Electrical Power System Upgrades EA March 9, 2000 DOE/LAAO iii CONTENTS ACRONYMS AND TERMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii EXECUTIVE SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1.0 PURPOSE AND NEED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1.1 Role of Cooperating Agencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 Background . . . . . . .

254

ATLAS Upgrade Instrumentation in the US  

E-Print Network (OSTI)

Planned upgrades of the LHC over the next decade should allow the machine to operate at a center of mass energy of 14 TeV with instantaneous luminosities in the range 5--7e34 cm^-2 s^-1. With these parameters, ATLAS could collect 3,000 fb^-1 of data in approximately 10 years. However, the conditions under which this data would be acquired are much harsher than those currently encountered at the LHC. For example, the number of proton-proton interactions per bunch crossing will rise from the level of 20--30 per 50 ns crossing observed in 2012 to 140--200 every 25 ns. In order to deepen our understanding of the newly discovered Higgs boson and to extend our searches for physics beyond that new particle, the ATLAS detector, trigger, and readout will have to undergo significant upgrades. In this whitepaper we describe R&D necessary for ATLAS to continue to run effectively at the highest luminosities foreseen from the LHC. Emphasis is placed on those R&D efforts in which US institutions are playing a leading role.

Gustaaf Brooijmans; Hal Evans; Abe Seiden

2013-07-22T23:59:59.000Z

255

Gulf Shale Oil Upgrading Process technology  

SciTech Connect

A description of the Gulf Shale Oil Hydrotreating Process, which is designed for upgrading full range shale oil to premium quality synthetic crude, is presented. The process consists of two sections: a low severity pretreating section which stabilizes the raw oil, removes iron, arsenic, trace metals and particulates, and sulfur; and a twostage, high severity hydrotreating section which completes the upgrading. The second section hydrotreats the bulk oil to a specified nitrogen content, allowing for a quality FCC feedstock in the 650F+ (343C+) residue. The main reactor effluent is flashed with subsequent hydrotreating of the flash vapor oil to achieve a low nitrogen level in the naphtha and middle distillate. The benefit of this flash configuration is hydrogen addition selectivity which maximizes syncrude quality while minimizing overall hydrogen consumption; this selectivity relationship is detailed. Finally, the product quality of the syncrudes produced with the Gulf Shale Oil Hydrotreating Process using shale oils derived from three different retort technologies and for Western and Eastern shales are discussed.

Jones, W.; Antezana, F.J.; Cugini, A.V.; Lyzinski, D.; Miller, J.B.

1984-04-01T23:59:59.000Z

256

High Gradient Operation with the CEBAF Upgrade RF Control System  

SciTech Connect

The CEBAF Accelerator at Jefferson Lab is presently a 6 GeV five pass electron accelerator consisting of two superconducting linacs joined by independent magnetic transport arcs. Energy will be upgraded to 12 GeV with the addition of 10 new high gradient cryomodules (17+ MV/m). The higher gradients pose significant challenges beyond what the present analog low level RF (LLRF) control systems can handle reliably; therefore, a new LLRF control system is needed. A prototype system has been developed incorporating a large FPGA and using digital down and up conversion to minimize the need for analog components. The new system is more flexible and less susceptible to drifts and component nonlinearities. Because resonance control is critical to reach high gradients quickly, the new cryomodules will include a piezoelectric tuner for each cavity, and the LLRF controls must incorporate both feedback and feed-forward methods to achieve optimal resonance control performance. This paper discusses development of the new RF system, system performance for phase and amplitude stability and resonance control under Lorentz detuning measured during recent tests on a prototype cryomodule.

J. Hovater; G. Davis; Hai Dong; Alicia Hofler; Lawrence King; John Musson; Tomasz Plawski

2006-08-16T23:59:59.000Z

257

Independent transmission company (ITC) and markets for transmission  

E-Print Network (OSTI)

Independent Abstract-- transmission company (ITC) and markets for transmission Yong T. Yoon Marija a fundamental structure for the transmission provider (TP) composed of the independent transmission company (ITC out the associated functions including managing transmission congestion. At the minimum

Ilic, Marija D.

258

Electric Power Industry Needs for Grid-Scale Storage Applications |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industry Needs for Grid-Scale Storage Applications Industry Needs for Grid-Scale Storage Applications Electric Power Industry Needs for Grid-Scale Storage Applications Stationary energy storage technologies will address the growing limitations of the electricity infrastructure and meet the increasing demand for renewable energy use. Widespread integration of energy storage devices offers many benefits, including the following: Alleviating momentary electricity interruptions Meeting peak demand Postponing or avoiding upgrades to grid infrastructure Facilitating the integration of high penetrations of renewable energy Providing other ancillary services that can improve the stability and resiliency of the electric grid Electric Power Industry Needs for Grid-Scale Storage Applications More Documents & Publications

259

Three essays concerning information transmission  

E-Print Network (OSTI)

Transmissionas an Information-Transmission Mechanism,” American EconomicConcerning Information Transmission A dissertation submitted

Boone, Johnathan

2010-01-01T23:59:59.000Z

260

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

262

Flexible and Strategic Transmission Planning  

Science Conference Proceedings (OSTI)

This update describes two separate but related planning frameworks developed for this project: 1) balancing of reliability and economics in transmission planning and 2) consideration of the need for operational flexibility in planning. Projects that improve reliability can also improve economics, and vice versa. The challenge is in achieving the reliability goals with as much economic benefit as possible, in other words, balancing the reliability and economic goals without compromising either. A method o...

2011-12-22T23:59:59.000Z

263

San Antonio Small Businesses "Seeing the Light" with Energy Upgrades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Antonio Small Businesses "Seeing the Light" with Energy Antonio Small Businesses "Seeing the Light" with Energy Upgrades San Antonio Small Businesses "Seeing the Light" with Energy Upgrades March 21, 2012 - 2:27pm Addthis KBK to the Trade 1 of 5 KBK to the Trade Thanks to the City Lights program, this design shop is saving an estimated 25,500 kilowatt-hours and $2,000 on electricity bills each year. | Photo Credit: City of San Antonio Date taken: 2011-05-24 15:06 Gallista Gallery 2 of 5 Gallista Gallery Joe Lopez, artist and owner of the Gallista Gallery, received energy and money-saving lights through the City Lights program. "We compared our bills to last year and we have seen a decrease...They should have more programs like this... Small businesses need help. We struggle as a small business, every little bit helps." | Photo Credit: City of San Antonio

264

Underground Transmission Construction: Vault and Manhole Design and Current Practices  

Science Conference Proceedings (OSTI)

Underground transmission (UT) cable systems are alternatives to overhead transmission lines, especially if the costs in design and construction of the UT cable systems are further reduced. Among the major activities of an underground transmission cable project, vault (manhole) designs and related safety issues need to be addressed. Manhole design and construction account for one of the major costs in a cable project.

2009-12-08T23:59:59.000Z

265

BIG Energy Upgrade: Procurement and Supply Chain report  

E-Print Network (OSTI)

BIG Energy Upgrade: Procurement and Supply Chain report ­ Green Deal and Energy Efficiency. Cover Image © Yorkshire Energy Services #12;BIG Energy Upgrade: Procurement and Supply Chain report ­ Green Deal and Energy Efficiency Retrofitting Supply Chains Delivery Professor S.C. Lenny Koh Dr Andrea

Wrigley, Stuart

266

Operational test report integrated system test (ventilation upgrade)  

Science Conference Proceedings (OSTI)

Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

HARTY, W.M.

1999-10-05T23:59:59.000Z

267

Guide for Economic Evaluation of Flexible AC Transmission Systems (FACTS) in Open Access Environments  

Science Conference Proceedings (OSTI)

The onset of deregulation in the electric power industry may have a chilling effect on a utility's willingness to upgrade its power delivery system because of perceived economic or environmental risks. This report provides a guide for utilities when undertaking evaluation and planning for the use of Flexible AC Transmission System (FACTS) technology as cost-effective devices for power delivery system enhancements.

1997-08-27T23:59:59.000Z

268

Unique Solar Thermal Laboratory Gets an Upgrade | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade September 10, 2010 - 2:54pm Addthis This “power tower” is part of the National Solar Thermal Test Facility in Albuquerque, which is getting upgrades through Recovery Act funding. | Photo Courtesy of Sandia National Laboratories This "power tower" is part of the National Solar Thermal Test Facility in Albuquerque, which is getting upgrades through Recovery Act funding. | Photo Courtesy of Sandia National Laboratories Lorelei Laird Writer, Energy Empowers The National Solar Thermal Test Facility at Sandia National Laboratories is unique - and in demand. The Facility has been instrumental in NASA tests, national defense programs and concentrated solar technology development.

269

EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Idaho National Engineering Laboratory Sewer System Upgrade 7: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho SUMMARY This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho. The proposed action would include activities conducted at the Central Facilities Area, Test Reactor Area, and the Containment Test Facility at the Test Area North at INEL. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 1, 1994 EA-0907: Finding of No Significant Impact Idaho National Engineering Laboratory Sewer System Upgrade Project

270

Energy Efficiency Upgrades Help Retired Military Officers Save Money |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Upgrades Help Retired Military Officers Save Energy Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs What are the key facts? A retirement community in San Antonio worked with a local Better

271

Energy Efficiency Upgrades Help Retired Military Officers Save Money |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Efficiency Upgrades Help Retired Military Officers Save Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs What are the key facts? A retirement community in San Antonio worked with a local Better

272

The 12 GeV Energy Upgrade at Jefferson Laboratory  

SciTech Connect

Two new cryomodules and an extensive upgrade of the bending magnets at Jefferson Lab has been recently completed in preparation for the full energy upgrade in about one year. Jefferson Laboratory has undertaken a major upgrade of its flagship facility, the CW re-circulating CEBAF linac, with the goal of doubling the linac energy to 12 GeV. I will discuss here the main scope and timeline of the upgrade and report on recent accomplishments and the present status. I will then discuss in more detail the core of the upgrade, the new additional C100 cryomodules, their production, tests and recent successful performance. I will then conclude by looking at the future plans of Jefferson Laboratory, from the commissioning and operations of the 12 GeV CEBAF to the design of the MEIC electron ion collider.

Pilat, Fulvia C. [JLAB

2012-09-01T23:59:59.000Z

273

Energy Efficiency Upgrades Help Build Better Neighborhoods | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Efficiency Upgrades Help Build Better Neighborhoods Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs

274

Energy Efficiency Upgrades Help Build Better Neighborhoods | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs

275

Categorical Exclusion 4598: Security Upgrade Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determination Form Determination Form Proposed Action Title: Security Upgrade Project (4598) Program or Field Office~ Y·12 Site Office LocationCs) CCjty/County/State): Oak Ridge. Anderson County, Tennessee Proposed Action Description: PAGE 04 / 04 r~:·:~~s ·'-u ~'irllO:.'~~b ., .. y " ~e ··· ., ;:;;,il ,;: ; I·;;;:;;,; ;I ,' .: :~~. ,U,Illll\;: , "':ll ,l3~ . ~~~~ 1 ~; The proposed action is to add fence posts and run razor wire in various fence locations throughout the site. This project will not require excavation. This activity will disturb gravel but will not remove gravel and soil from post holes which will be placed back in the same area. Cat.eg,orieal Exc!usion(s) ,Mp!i.cd: 81.3- Routine maintenance

276

UPGRADING NATURAL GAS VIA MEMBRANE SEPARATION PROCESSES  

SciTech Connect

The objective of the present study is to assess the potential usefulness of membrane separation processes for removing CO{sub 2} and H{sub 2}S from low-quality natural gas containing substantial amounts of both these ''acid'' gases, e.g., up to 40 mole-% CO{sub 2} and 10 mole-% H{sub 2}S. The membrane processes must be capable of upgrading the crude natural gas to pipeline specifications ({le} 2 mole-% CO{sub 2}, {le} 4 ppm H{sub 2}S). Moreover, these processes must also be economically competitive with the conventional separation techniques, such as gas absorption, utilized for this purpose by the gas industry.

S.A.Stern; P.A. Rice; J. Hao

2000-03-01T23:59:59.000Z

277

Transverse instability analysis for the IPNS Upgrade  

SciTech Connect

The proposed 1-MW spallation neutron source upgrade calls for a 2-GeV rapidly-cycling synchrotron (RCS) with an intensity of 1.04{times}10{sup 14} protons per pulse. The potential exists for the excitation of collective, intensity-dependent transverse instabilities. These can normally be controlled by introducing a betatron tune shift or spread, where care is exercised to avoid single-particle resonance effects. Adjusting the chromaticity using sextupoles to vary the head-to-tail phase shift is compared to introducing Landau damping by octupoles. An option for a feedback system is also examined. The momentum spread used for the transverse analysis was obtained from the requirements for longitudinal stability.

Harkay, K.; Cho, Y.

1995-07-01T23:59:59.000Z

278

Steam turbine upgrading: low-hanging fruit  

Science Conference Proceedings (OSTI)

The thermodynamic performance of the steam turbine, more than any other plant component, determines overall plant efficiency. Upgrading steam path components and using computerized design tools and manufacturing techniques to minimise internal leaks are two ways to give tired steam turbines a new lease on life. The article presents three case studies that illustrate how to do that. These are at Unit 1 of Dairyland's J.P. Madgett Station in Alma, WI, a coal-fired subcritical steam plant; the four units at AmerenUE's 600 MW coal-fired Labadie plant west of St. Louis; and Unit 3 of KeyPlan Corp's Northport Power Station on Long Island. 8 figs.

Peltier, R.

2006-04-15T23:59:59.000Z

279

Economic enhancement of Western shale oil upgrading  

DOE Green Energy (OSTI)

A proof-of-concept study for a novel shale oil refining process was undertaken. This project promises reduced upgrading costs, thereby making shale oil development more feasible for commercialization. The process consists of distillation of raw shale oil into a distillate and residue portion, cracking of the residue by hydropyrolysis, and selective hydrotreating of narrow boiling cuts from the total distillate. Based on models and experimental data, the end product slate is projected to be 34% naphtha, 57% middle distillate, and 10.3% atm residue + coke. Hydrogen addition is 1.3% or 800 scf/bbl. These results are considerably improved over conventional processing, which gives 14% naphtha, 41% middle distillate, and 48.2% residue + coke and hydrogen addition of 3.2% or 2000 scf/bbl. More quantitative data and preliminary economics will be obtained in the next phase of study. 13 refs., 3 figs., 6 tabs.

Bunger, J. W.; Ryu, H.; Jeong, S. Y.

1989-07-01T23:59:59.000Z

280

The DIII-D cryogenic system upgrade  

SciTech Connect

The original DIII-D cryogenic system was commissioned in 1981 and was used to cool the cryopanel arrays for three hydrogen neutral beam injectors. Since then, new demands for liquid helium have arisen including: a fourth neutral beam injector, ten superconducting magnets for the electron cyclotron heating gyrotrons, and more recently, the advanced diverter cryopump which resides inside the tokamak vacuum vessel. The original cryosystem could not meet these demands. Consequently, the cryosystem was upgraded in several phases to increase capacity, improve reliability, and reduce maintenance. The majority of the original system has been replaced with superior equipment. The capacity now exists to support present as well as future demands for liquid helium at DIII-D including a hydrogen pellet injector, which is being constructed by Oak Ridge National Laboratory. Upgrades to the cryosystem include: a recently commissioned 150 {ell}/hr helium liquefier, two 55 g/sec helium screw compressors, a fully automated 20-valve cryogen distribution box, a high efficiency helium wet expander, and the conversion of equipment from manual or pneumatic to programmable logic controller (PLC) control. The distribution box was designed and constructed for compactness due to limited space availability. Overall system efficiency was significantly improved by replacing the existing neutral beam reliquefier Joule-Thomson valve with a reciprocating wet expander. The implementation of a PLC-based automatic control system has resulted in increased efficiency and reliability. This paper will describe the cryosystem design with emphasis on newly added equipment. In addition, performance and operational experience will be discussed.

Schaubel, K.M.; Laughon, G.J.; Campbell, G.L.; Langhorn, A.R.; Stevens, N.C.; Tupper, M.L.

1993-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

A Neutral Beam Injector Upgrade for NSTX  

Science Conference Proceedings (OSTI)

The National Spherical Torus Experiment (NSTX) capability with a Neutral Beam Injector (NBI) capable of 80 kiloelectronvolt (keV), 5 Megawatt (MW), 5 second operation. This 5.95 million dollar upgrade reused a previous generation injector and equipment for technical, cost, and schedule reasons to obtain these specifications while retaining a legacy capability of 120 keV neutral particle beam delivery for shorter pulse lengths for possible future NSTX experiments. Concerns with NBI injection included power deposition in the plasma, aiming angles from the fixed NBI fan array, density profiles and beam shine through, orbit losses of beam particles, and protection of the vacuum vessel wall against beam impingement. The upgrade made use of the beamline and cryo panels from the Neutral Beam Test Stand facility, existing power supplies and controls, beamline components and equipment not contaminated by tritium during DT [deuterium-tritium] experiments, and a liquid Helium refrigerator plant to power and cryogenically pump a beamline and three ion sources. All of the Tokamak Fusion Test Reactor (TFTR) ion sources had been contaminated with tritium, so a refurbishment effort was undertaken on selected TFTR sources to rid the three sources destined for the NSTX NBI of as much tritium as possible. An interconnecting duct was fabricated using some spare and some new components to attach the beamline to the NSTX vacuum vessel. Internal vacuum vessel armor using carbon tiles was added to protect the stainless steel vacuum vessel from beam impingement in the absence of plasma and interlock failure. To date, the NBI has operated to 80 keV and 5 MW and has injected requested power levels into NSTX plasmas with good initial results, including high beta and strong heating characteristics at full rated plasma current.

T. Stevenson; B McCormack; G.D. Loesser; M. Kalish; S. Ramakrishnan; L. Grisham; J. Edwards; M. Cropper; G. Rossi; A. von Halle; M. Williams

2002-01-18T23:59:59.000Z

282

Upgraded HFIR Fuel Element Welding System  

Science Conference Proceedings (OSTI)

The welding of aluminum-clad fuel plates into aluminum alloy 6061 side plate tubing is a unique design feature of the High Flux Isotope Reactor (HFIR) fuel assemblies as 101 full-penetration circumferential gas metal arc welds (GMAW) are required in the fabrication of each assembly. In a HFIR fuel assembly, 540 aluminum-clad fuel plates are assembled into two nested annular fuel elements 610 mm (24-inches) long. The welding process for the HFIR fuel elements was developed in the early 1960 s and about 450 HFIR fuel assemblies have been successfully welded using the GMAW process qualified in the 1960 s. In recent years because of the degradation of the electronic and mechanical components in the old HFIR welding system, reportable defects in plate attachment or adapter welds have been present in almost all completed fuel assemblies. In October 2008, a contract was awarded to AMET, Inc., of Rexburg, Idaho, to replace the old welding equipment with standard commercially available welding components to the maximum extent possible while maintaining the qualified HFIR welding process. The upgraded HFIR welding system represents a major improvement in the welding system used in welding HFIR fuel elements for the previous 40 years. In this upgrade, the new inner GMAW torch is a significant advancement over the original inner GMAW torch previously used. The innovative breakthrough in the new inner welding torch design is the way the direction of the cast in the 0.762 mm (0.030-inch) diameter aluminum weld wire is changed so that the weld wire emerging from the contact tip is straight in the plane perpendicular to the welding direction without creating any significant drag resistance in the feeding of the weld wire.

Sease, John D [ORNL

2010-02-01T23:59:59.000Z

283

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

284

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

285

Arnold Schwarzenegger TRANSMISSION BENEFIT  

E-Print Network (OSTI)

California Edison's (SCE) initial Tehachapi transmission trunk-line proposal for integration of wind. The Tehachapi Transmission Project to integrate 4,500 MW of renewable wind energy has since been approved after

286

Transmission Investment Incentives  

Science Conference Proceedings (OSTI)

This report documents the use of agent-based simulation as a tool for studying transmission investment incentives, and it is meant to illuminate what accounts for the difficulties in aligning incentives for enhancing the transmission system. The report suggests that a new method of calculation for bid optimization be applied to the economic analysis of long-term incentives for transmission investment. This technology can be broadly applied to help negotiators in transmission planning quantify their count...

2006-12-21T23:59:59.000Z

287

U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative December 23, 2008 - 9:18am...

288

Technology needs for decommissioning and decontamination  

Science Conference Proceedings (OSTI)

This report summarizes the current view of the most important decontamination and decommissioning (D & D) technology needs for the US Department of Energy facilities for which the D & D programs are the responsibility of Martin Marietta Energy Systems, Inc. The source of information used in this assessment was a survey of the D & D program managers at each facility. A summary of needs presented in earlier surveys of site needs in approximate priority order was supplied to each site as a starting point to stimulate thinking. This document reflects a brief initial assessment of ongoing needs; these needs will change as plans for D & D are finalized, some of the technical problems are solved through successful development programs, and new ideas for D and D technologies appear. Thus, this assessment should be updated and upgraded periodically, perhaps, annually. This assessment differs from others that have been made in that it directly and solely reflects the perceived need for new technology by key personnel in the D & D programs at the various facilities and does not attempt to consider the likelihood that these technologies can be successfully developed. Thus, this list of technology needs also does not consider the cost, time, and effort required to develop the desired technologies. An R & D program must include studies that have a reasonable chance for success as well as those for which there is a high need. Other studies that considered the cost and probability of successful development as well as the need for new technology are documented. However, the need for new technology may be diluted in such studies; this document focuses only on the need for new technology as currently perceived by those actually charged with accomplishing D & D.

Bundy, R.D.; Kennerly, J.M.

1993-12-01T23:59:59.000Z

289

Booster Synchrotron RF System Upgrade for SPEAR3  

Science Conference Proceedings (OSTI)

Recent progress at the SPEAR3 includes the increase in stored current from 100 mA to 200 mA and top-off injection to allow beamlines to stay open during injection. Presently the booster injects 3.0 GeV beam to SPEAR3 three times a day. The stored beam decays to about 150 mA between the injections. The growing user demands are to increase the stored current to the design value of 500 mA, and to maintain it at a constant value within a percent or so. To achieve this goal the booster must inject once every few minutes. For improved injection efficiency, all RF systems at the linac, booster and SPEAR3 need to be phase-locked. The present booster RF system is basically a copy of the SPEAR2 RF system with 358.5 MHz and 40 kW peak RF power driving a 5-cell RF cavity for 1.0 MV gap voltage. These requirements entail a booster RF system upgrade to a scaled down version of the SPEAR3 RF system of 476.3 MHz with 1.2 MW cw klystron output power capabilities. We will analyze each subsystem option for their merits within budgetary and geometric space constraints. A substantial portion of the system will come from the decommissioned PEP-II RF stations.

Park, Sanghyun; /SLAC; Corbett, Jeff; /SLAC

2012-07-06T23:59:59.000Z

290

Extension - Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

Science Conference Proceedings (OSTI)

The need for cost effective technologies for upgrading coal mine methane to pipeline quality natural gas is becoming ever greater. The current work presents and investigates a new approach to reduce the impact of the most costly step in the conventional technology, nitrogen rejection. The proposed approach is based on the Velocys microchannel platform, which is being developed to commercialize compact and cost efficient chemical processing technology. For this separation, ultra fast thermal swing sorption is enabled by the very high rates of heat and mass transfer inherent in microchannel processing. In a first phase of the project solid adsorbents were explored. Feasibility of ultrafast thermal swing was demonstrated but the available adsorbents had insufficient differential methane capacity to achieve the required commercial economics. In a second phase, ionic liquids were adopted as absorbents of choice, and experimental work and economic analyses, performed to gauge their potential, showed promise for this novel alternative. Final conclusions suggest that a combination of a required cost target for ionic liquids or a methane capacity increase or a combination of both is required for commercialization.

Anna Lee Tonkovich

2008-08-11T23:59:59.000Z

291

Screening of processing and upgrading schemes. Task 3  

DOE Green Energy (OSTI)

The RFP was predicated on DOE`s desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily ``skimmed`` from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

Not Available

1991-10-01T23:59:59.000Z

292

Transmission Issues and Power Exchanges in Texas  

E-Print Network (OSTI)

The electric transmission system in Texas has evolved over the years to its present state, in order to provide reliable service and reduce the amount of reserve capacity any individual utility needs to maintain. Presently there is pressure on the transmission owning utilities by several parties, primary distribution cooperatives, cogenerators, and large industrial customers, to grant wider access to the system. This pressure is coming at a time when transmission lines are becoming increasingly difficult to build. This paper presents a historical background on the development of the transmission system and describes the problems of assessing the impact and properly pricing certain bulk power transactions. In addition, it briefly describes the Electro-Magnetic Fields problem and how it relates to new transmission line construction.

Hughes, H. L.

1992-04-01T23:59:59.000Z

293

Automated manual transmission controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

294

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

295

National Postirradiation Examination Workshop Needs Assessment  

SciTech Connect

The development of nuclear fuels and materials requires a clear understanding of irradiation effects on the materials performance. Development of this understanding at present relies on irradiation experiments ranging from tests aimed at targeted phenomenology to integral effects under both prototypic and off-normal conditions. Within the new DOE paradigm of a science-based approach aimed at more fundamental understanding of fuel performance, more specialized experiments and measurements are needed. To support the development of such fuels and materials, especially under a science-based development strategy, the nation needs a consolidated, state-of-the-art, post-irradiation examination (PIE) capability that can reliably extract the needed data from the experimental programs. In some cases, new capabilities beyond the current state-of-the art need to be developed and implemented to perform measurements that were not needed in the more empirically based approaches used in earlier fuel development and qualification programs. A national PIE workshop was held in March 2011 which solicited the PIE needs that are necessary to support both DOE and U.S. goals for nuclear energy. These needs recognize that significant capability already exists that must be maintained, upgraded and continued while bringing online new capabilities that support research on highly irradiated fuels and materials. Further, these needs mostly focus on the reducing the time and length scales in which materials can be examined and coupling these measurements with a robust modeling capability within an infrastructure that can meet the needs of higher demand and a variety of customers. A consolidated capability where a comprehensive set of measurements can be simultaneously performed is essential for efficiently implementing fuel and materials development programs in a cost effective manner. This document captures the national PIE needs necessary to support current and future research, and where possible identifies where those capabilities are allocated.

Not listed

2011-09-01T23:59:59.000Z

296

IntelliGrid Transmission Architecture Development  

Science Conference Proceedings (OSTI)

Objective Future transmission system operations require the development of a distributed computing infrastructure that can keep up with the demands of new applications as well as the technical pressures being placed on power systems. This project identifies issues related to the supporting communications and distributed computing infrastructures necessary to support the next generation of transmission monitoring, control, and operations. Although substantial work has been completed, more is needed to dev...

2008-03-31T23:59:59.000Z

297

Managing Transmission Line Steel Structures, Version 2  

Science Conference Proceedings (OSTI)

Utilities are under more pressure than ever to efficiently utilize existing overhead lines by optimizing their life and reliability. A key issue involves the question of how to efficiently inspect and maintain transmission systems. In light of aging transmission and distribution infrastructures, resources are needed to design and implement cost-effective assessment and maintenance programs. This valuable reference provides an in-depth look at all facets of an inspection, assessment, and maintenance progr...

2004-12-02T23:59:59.000Z

298

The Jefferson Lab 12 GeV Upgrade  

Science Conference Proceedings (OSTI)

A major upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility is in progress. Construction began in 2008 and the project should be completed in 2015. The upgrade includes doubling the energy of the electron beam to 12 GeV, the addition of a new fourth experimental hall, and new experimental equipment in three of the experimental halls. A brief overview of this upgrade project is presented along with some highlights of the anticipated experimental program.

R.D. McKeown

2011-10-01T23:59:59.000Z

299

Definition: Transmission Service Provider | Open Energy Information  

Open Energy Info (EERE)

Transmission Service Provider The entity that administers the transmission tariff and provides Transmission Service to Transmission Customers under applicable...

300

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications 2013 Transmission Reliability Program Peer Review - Day 1...

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

EIS-0377: Big Stone II Power Plant and Transmission Project | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Big Stone II Power Plant and Transmission Project 7: Big Stone II Power Plant and Transmission Project EIS-0377: Big Stone II Power Plant and Transmission Project SUMMARY A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission line and substation upgrades and modifications that would be required to support the addition of 600 MW of capacity within the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 24, 2009 EIS-0377: Record of Decision Big Stone II Power Plant and Transmission Project June 1, 2009 EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project October 26, 2007 EIS-0377: Supplemental Draft Environmental Impact Statement

302

NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability  

NLE Websites -- All DOE Office Websites (Extended Search)

NERSC's Franklin NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability July 20, 2009 OCEAN EDDIES: This image comes from a computer simulation modeling eddies in the ocean. An interesting feature is the abundance of eddies away from the equator, which is shown in the center of the image at y=0. This research collaboration led by Paola Cessi of the Scripps Institute of Oceanography performed over 15,000 years worth of deep ocean circulation simulations with 1.6 million processor core hours on the upgraded Franklin system. The Department of Energy's (DOE) National Energy Research Scientific Computing (NERSC) Center has officially accepted a series of upgrades to its Cray XT4 supercomputer, providing the facility's 3,000 users with twice

303

Builder Brings Tradition to Efficient Home Upgrades | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

home. However, Artistic Homes calculates that the 49,550 price tag to upgrade a 2,157-square-foot home shrinks to about 811 after applying incentives and tax credits. And because...

304

SRS upgrades helium recovery system | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

upgrades helium recovery system | National Nuclear Security upgrades helium recovery system | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > SRS upgrades helium recovery system SRS upgrades helium recovery system Posted By Office of Public Affairs Savannah River Site (SRS) Tritium Programs recently completed a project to design, build and relocate a new system for separating and capturing

305

Federal Finance Facilities Available for Energy Efficiency Upgrades and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Finance Facilities Available for Energy Efficiency Upgrades Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment "Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment" is a resource guide that lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local and tribal leaders, along with their partners in the private sector, to find capital for energy efficiency and clean energy projects. This first-edition guide is a product of a cooperative effort among seven federal agencies, including the U.S. Departments of Agriculture, Energy, Housing and Urban Development, Transportation and Treasury, along with the

306

Federal Finance Facilities Available for Energy Efficiency Upgrades and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Finance Facilities Available for Energy Efficiency Upgrades Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment "Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment" is a resource guide that lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local and tribal leaders, along with their partners in the private sector, to find capital for energy efficiency and clean energy projects. This first-edition guide is a product of a cooperative effort among seven federal agencies, including the U.S. Departments of Agriculture, Energy, Housing and Urban Development, Transportation and Treasury, along with the

307

Energy Efficiency Upgrades Part of Winning Formula for Oregon School  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upgrades Part of Winning Formula for Oregon Upgrades Part of Winning Formula for Oregon School District Energy Efficiency Upgrades Part of Winning Formula for Oregon School District August 27, 2012 - 9:45am Addthis The community of Vernonia, OR, celebrates the opening of a new energy efficient school. | Photo courtesy of April Baer, OPB. The community of Vernonia, OR, celebrates the opening of a new energy efficient school. | Photo courtesy of April Baer, OPB. Todd G. Allen Project Officer, Golden Field Office What are the key facts? Energy efficiency upgrades will reduce the Vernonia school district's energy usage by 43 percent and save taxpayers more than $62,000 a year. The school will also serve as a laboratory for forest technologies

308

Retrofit Upgrade of Center Break Cell Technology to Point Feeding ...  

Science Conference Proceedings (OSTI)

... been a few attempts worldwide to upgrade these cells so as to implement the newer ... The results show that this project has decreased the energy consumption and ... Production Application Study on Magneto-Hydro-Dynamic Stability of a ...

309

Thomson scattering diagnostic upgrade on DIII-D  

Science Conference Proceedings (OSTI)

The DIII-D Thomson scattering system has been upgraded. A new data acquisition hardware was installed, adding the capacity for additional spatial channels and longer acquisition times for temperature and density measurements. Detector modules were replaced with faster transimpedance circuitry, increasing the signal-to-noise ratio by a factor of 2. This allows for future expansion to the edge system. A second phase upgrade scheduled for 2010-2011 includes the installation of four 1 J/pulse Nd:YAG lasers at 50 Hz repetition rate. This paper presents the first completed phase of the upgrade and performance comparison between the original system and the upgraded system. The plan for the second phase is also presented.

Ponce-Marquez, D. M.; Bray, B. D.; Deterly, T. M.; Liu, C. [General Atomics, P.O. Box 85608, San Diego, California 092186-5608 (United States); Eldon, D. [University of California-San Diego, La Jolla, California 92093-0417 (United States)

2010-10-15T23:59:59.000Z

310

Office of Science Approves Critical Decision 1 for APS Upgrade...  

NLE Websites -- All DOE Office Websites (Extended Search)

2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Office of Science Approves Critical Decision 1 for APS Upgrade Project SEPTEMBER 15, 2011...

311

San Antonio Small Businesses "Seeing the Light" with Energy Upgrades...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

with Energy Upgrades March 21, 2012 - 2:27pm Addthis KBK to the Trade 1 of 5 KBK to the Trade Thanks to the City Lights program, this design shop is saving an estimated 25,500...

312

Energy Star Building Upgrade Manual Lighting Chapter 6  

NLE Websites -- All DOE Office Websites (Extended Search)

O&M Manual 34 Dispose of Lamps Properly 35 6.9 Summary 36 Bibliography 36 Glossary G-1 ENERGY STAR Building Manual 2 6. Lighting 6.1 Overview A lighting upgrade is the second...

313

Contractor Sales Training: Providing the Skills Necessary to Sell Comprehensive Home Energy Upgrades  

Science Conference Proceedings (OSTI)

Many comprehensive home energy efficiency programs rely on contractors as the customer-facing ‘front line’ to sell energy improvements. Adding sales skills to contractors’ existing technical expertise is key to converting more assessments into comprehensive home energy upgrades. Leading programs recognize the need to support contractors with sales and business training to help them succeed and to support the growth of the home performance industry for the long term. A number of contractor sales training efforts are emerging, including some programs that are seeing encouraging early results.

Billingsley, Megan; Stuart, Elizabeth

2011-08-17T23:59:59.000Z

314

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

315

Commissioning results from the recently upgraded RHIC LLRF system  

Science Conference Proceedings (OSTI)

During RHIC Run 10, the first phase of the LLRF Upgrade was successfully completed. This involved replacing the aging VME based system with a modern digital system based on the recently developed RHIC LLRF Upgrade Platform, and commissioning the system as part of the normal RHIC start up process. At the start of Run 11, the second phase of the upgrade is underway, involving a significant expansion of both hardware and functionality. This paper will review the commissioning effort and provide examples of improvements in system performance, flexibility and scalability afforded by the new platform. The RHIC LLRF upgrade is based on the recently developed RHIC LLRF Upgrade Platform. The major design goals of the platform are: (1) Design a stand alone, generic, digital, modular control architecture which can be configured to satisfy all of the application demands we currently have, and which will be supportable and upgradeable into the foreseeable future; and (2) It should integrate seamlessly into existing controls infrastructure, be easy to deploy, provide access to all relevant control parameters (eliminate knobs), provide vastly improved diagnostic data capabilities, and permit remote reconfiguration. Although the system is still in its infancy, we think the initial commissioning results from RHIC indicate that these goals have been achieved, and that we've only begun to realize the benefits the platform provides.

Smith, K.S.; Harvey, M.; Hayes, T.; Narayan, G.; Severino, F.; Yuan, S.; Zaltsman, A.

2011-03-28T23:59:59.000Z

316

Video Transmission Jerkiness Measure.  

E-Print Network (OSTI)

??Digital video transmission is widely used nowadays in multimedia. Frame dropping, freeze and reduced number of frames in the transmitted video are common symptoms of… (more)

Abdelsamad, Deena

2013-01-01T23:59:59.000Z

317

NIST Transmission SEM  

Science Conference Proceedings (OSTI)

... As a result, more electrons will scatter, to provide the ... RR Keller, "Transmission EBSD in the Scanning Electron Microscope," Microscopy Today vol. ...

2013-07-29T23:59:59.000Z

318

Patterns of transmission investment  

E-Print Network (OSTI)

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

319

Upgrade, Parker Annex, La Paz County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Bouse Substation Expansion and Upgrade, Parker Annex, La Paz County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western has requested that APS relocate an existing 69kV transmission line. This will consist of replacing existing conductor and 69-kV Gang Operated Switch and installing 6 new steel monopole structures, an above ground primary meter and underground cable from the 3 phase transition. The project is located in La Paz County, Arizona. The legal description is Section 27 & 34 Township 8 North, Range 19 West on the Gila and Salt River Baseline and Meridian (USGS Black Peak & Bouse NW, AZ 7.5' maps). Western owns the land. This work is planned to begin the month of September 2011 and be completed by

320

Microsoft Word - CX-RossTransformerOilTerminalUpgradeFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2012 4, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Ross Transformer Oil Terminal Upgrade Work Order #: 00298659 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6, Additions or modifications to electric power transmission facilities Location: Ross Complex, Township 2 North, Range 1 East, Section 14 of Clark County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install four new horizontal, double walled, 20,000 gallon insulating oil storage tanks at BPA's Ross Complex. In addition, BPA would install a railcar oil pumping and transfer system as well as a truck oil transfer pad. Both the

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Natural Gas Transmission Pipeline Siting Act (Florida) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Transmission Pipeline Siting Act (Florida) Natural Gas Transmission Pipeline Siting Act (Florida) Natural Gas Transmission Pipeline Siting Act (Florida) < Back Eligibility Commercial Construction Developer Fed. Government Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection This Act establishes a centralized and coordinated permitting process for the location of natural gas transmission pipeline corridors and the construction and maintenance of natural gas transmission pipelines. The Act intends to achieve a reasonable balance between the need for the natural

322

Human-machine interface (HMI) report for 241-SY-101 data acquisition [and control] system (DACS) upgrade study  

SciTech Connect

This report provides an independent evaluation of information for a Windows based Human Machine Interface (HMI) to replace the existing DOS based Iconics HMI currently used in the Data Acquisition and Control System (DACS) used at Tank 241-SY-101. A fundamental reason for this evaluation is because of the difficulty of maintaining the system with obsolete, unsupported software. The DACS uses a software operator interface (Genesis for DOS HMI) that is no longer supported by its manufacturer, Iconics. In addition to its obsolescence, it is complex and difficult to train additional personnel on. The FY 1997 budget allocated $40K for phase 1 of a software/hardware upgrade that would have allowed the old DOS based system to be replaced by a current Windows based system. Unfortunately, budget constraints during FY 1997 has prompted deferral of the upgrade. The upgrade needs to be performed at the earliest possible time, before other failures render the system useless. Once completed, the upgrade could alleviate other concerns: spare pump software may be able to be incorporated into the same software as the existing pump, thereby eliminating the parallel path dilemma; and the newer, less complex software should expedite training of future personnel, and in the process, require that less technical time be required to maintain the system.

Truitt, R.W.

1997-10-22T23:59:59.000Z

323

Heavy Oil Upgrading from Electron Beam (E-Beam) Irradiation  

E-Print Network (OSTI)

Society's growing demands for energy results in rapid increase in oil consumption and motivates us to make unconventional resources conventional resources. There are enormous amounts of heavy oil reserves in the world but the lack of cost effective technologies either for extraction, transportation, or refinery upgrading hinders the development of heavy oil reserves. One of the critical problems with heavy oil and bitumen is that they require large amounts of thermal energy and expensive catalysts to upgrade. This thesis demonstrates that electron beam (E-Beam) heavy oil upgrading, which uses unique features of E-Beam irradiation, may be used to improve conventional heavy oil upgrading. E-Beam processing lowers the thermal energy requirements and could sharply reduce the investment in catalysts. The design of the facilities can be simpler and will contribute to lowering the costs of transporting and processing heavy oil and bitumen. E-Beam technology uses the high kinetic energy of fast electrons, which not only transfer their energy but also interact with hydrocarbons to break the heavy molecules with lower thermal energy. In this work, we conducted three major stages to evaluate the applicability of E-Beam for heavy oil upgrading. First, we conducted laboratory experiments to investigate the effects of E-Beam on hydrocarbons. To do so, we used a Van de Graff accelerator, which generates the high kinetic energy of electrons, and a laboratory scale apparatus to investigate extensively how radiation effects hydrocarbons. Second, we studied the energy transfer mechanism of E-Beam upgrading to optimize the process. Third, we conducted a preliminary economic analysis based on energy consumption and compared the economics of E-Beam upgrading with conventional upgrading. The results of our study are very encouraging. From the experiments we found that E-Beam effect on hydrocarbon is significant. We used less thermal energy for distillation of n-hexadecane (n-C16) and naphtha with E-Beam. The results of experiments with asphaltene indicate that E-Beam enhances the decomposition of heavy hydrocarbon molecules and improves the quality of upgraded hydrocarbon. From the study of energy transfer mechanism, we estimated heat loss, fluid movement, and radiation energy distribution during the reaction. The results of our economic evaluation show that E-Beam upgrading appears to be economically feasible in petroleum industry applications. These results indicate significant potential for the application of E-Beam technology throughout the petroleum industry, particularly near production facilities, transportation pipelines, and refining industry.

Yang, Daegil

2009-12-01T23:59:59.000Z

324

The progressive transmission disadvantage  

Science Conference Proceedings (OSTI)

The disadvantage of progressive transmission, compared to transmission in a single step, is analyzed for the high-rate case using a polytope that is self-similar under binary subdivision. This disadvantage is calculated to be 0.3424 dB or 0.057 bit compared ...

M. J. Durst

1997-01-01T23:59:59.000Z

325

4 MW upgrade to the DIII-D fast wave current drive system  

SciTech Connect

The DIII-D fast wave current drive (FWCD) system is being upgraded by an additional 4 MW in the 30 to 120 MHz frequency range. This capability adds to the existing 2 MW 30 to 60 MHz system. Two new ABB transmitters of the type that are in use on the ASDEX-Upgrade tokamak in Garching will be used to drive two new water-cooled four-strap antennas to be installed in DIII-D in early 1994. The transmission and tuning system for each antenna will be similar to that now in use for the first 2 MW system on DIII-D, but with some significant improvements. One improvement consists of adding a decoupler element to counter the mutual coupling between the antenna straps which results in large imbalances in the power to a strap for the usual current drive intrastrap phasing of 90{degrees}. Another improvement is to utilize pressurized, ceramic-insulated transmission lines. The intrastrap phasing will again be controlled in pairs, with a pair of straps coupled in a resonant loop configuration, locking their phase difference at either 0 or 180{degrees}, depending upon the length of line installed. These resonant loops will incorporate a phase shifter so that they will be able to be tuned to resonance at several frequencies in the operating band of the transmitter. With the frequency change capability of the ABB generators, the FWCD frequency will thus be selectable on a shot-to-shot basis, from this preselected set of frequencies. The schedule is for experiments to begin with this added 4 MW capability in mid-1994. The details of the system are described.

deGrassie, J.S.; Pinsker, R.I.; Cary, W.P.

1993-10-01T23:59:59.000Z

326

FOR ELECTRIC POWER TRANSMISSION  

E-Print Network (OSTI)

A contract network extends the concept of a contract path to address the problem of loop flow and congestion in electric power transmission systems. A contract network option provides a well defined, internally consistent framework for assigning long-term capacity rights to a complicated electric transmission network. The contract network respects the special conditions induced by Kirchoff's Laws; accommodates thermal, voltage and contingency constraints on transmission capacity; and can be adopted without disturbing existing methods for achieving an economic power dispatch subject to these constraints. By design, a contract network would maintain short-run efficiency through optimal spot price determination of transmission prices. Through payment of congestion rentals, the contract network makes a long-term capacityright holder indifferent between delivery of the power or receipt of payments in a settlement system. And the contract network framework can support allocation of transmission capacity rights through a competitive bidding process. CONTRACT NETWORKS

William W. Hogan; William W. Hogan

1990-01-01T23:59:59.000Z

327

Nonlinear magnetoinductive transmission lines  

E-Print Network (OSTI)

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent cap...

Lazarides, Nikos; Tsironis, G P

2011-01-01T23:59:59.000Z

328

High Resolution BPM Upgrade for the ATF Damping Ring at KEK  

Science Conference Proceedings (OSTI)

A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and digital down-conversion techniques, digital signal processing, and also implements a new automatic gain error correction schema. The technical concept and realization as well as results of beam studies are presented. The next generation of linear colliders require ultra-low vertical emittance of <2 pm-rad. The damping ring at the KEK Accelerator Test Facility (ATF) is designed to demonstrate this mission critical goal. A high resolution beam position monitor (BPM) system for the damping ring is one of the key tools for realizing this goal. The BPM system needs to provide two distnict measurements. First, a very high resolution ({approx}100-200nm) closed-orbit measurement which is averaged over many turns and realized with narrowband filter techniques - 'narrowband mode'. This is needed to monitor and steer the beam along an optimum orbit and to facilitate beam-based alignment to minimize non-linear field effects. Second, is the ability to make turn by turn (TBT) measurements to support optics studies and corrections necessary to achieve the design performance. As the TBT measurement necessitates a wider bandwidth, it is often referred to as 'wideband mode'. The BPM upgrade was initiated as a KEK/SLAC/FNAL collaboration in the frame of the Global Design Initiative of the International Linear Collider. The project was realized and completed using Japan-US funds with Fermilab as the core partner.

Eddy, N.; Briegel, C.; Fellenz, B.; Gianfelice-Wendt, E.; Prieto, P.; Rechenmacher, R.; Semenov, A.; Voy, D.; Wendt, M.; Zhang, D.; /Fermilab; Terunuma, N.; /KEK, Tsukuba

2011-08-17T23:59:59.000Z

329

Trends In U.S. Electric Power Transmission  

SciTech Connect

The report provides an overview of the changes that are occurring in the industry to implement the goals of improved reliability and reduced congestion costs. As the electric industry works to become a more efficient market, transmission stands as a key link between the competitive generation and the regulated distribution sectors. In this role as a key link, transmission is a major focus of government efforts to improve reliability and reduce congestion costs. The scope of the report is to analyze the dominant reliability, investment, siting, and competition/open access trends that are occurring in the domestic electric transmission industry. Topics covered include: the impact of the 2003 Northeast blackout on reliability rules; the move from voluntary to mandatory reliability standards; the advent of real-time transmission system monitoring; ISO/RTO efforts to improve system reliability; the drivers of government intervention in transmission investment; the move towards incentive-based rates for transmission investment; legislative and regulatory efforts to spur transmission investment to support renewable energy resources; the emergence of merchant transmission; the need for federal backstop authority on regional transmission projects; the designation of national interest electric transmission corridors; FERC Orders on siting transmission; the need for changes in open access and competition regulations; FERC efforts to increase open access and competition; legislative efforts to increase competition; and, current competitive issues in the industry.

NONE

2007-11-15T23:59:59.000Z

330

SRS Site Needs  

SRS Site Needs Neil R. Davis Program Manager Technology Development and Tank Closure Projects Washington Savannah River Company Aluminum/Chromium Leaching Technical ...

331

Concrete Foundations in Substations and Transmission Lines  

Science Conference Proceedings (OSTI)

This report presents the results of surveys conducted to obtain information on the degradation of concrete foundations that support transmission towers and high-voltage substation equipment. Although concrete foundations are simple and inexpensive, their degradation or failure may have costly consequences, including potential equipment damage and the need for outages to allow movement of critical equipment so the ...

2012-12-14T23:59:59.000Z

332

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

333

GRR/Section 8-CO-a - State Transmission | Open Energy Information  

Open Energy Info (EERE)

Will the Transmission Encroach on a State Highway ROW? If the developer intends to build transmission lines that encroach on state highway rights-of-way, it will need to acquire a...

334

Coordinating Interstate ElectricTransmission Siting: An Introduction to the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate ElectricTransmission Siting: An Coordinating Interstate ElectricTransmission Siting: An Introduction to the Debate Coordinating Interstate ElectricTransmission Siting: An Introduction to the Debate In recent years, experts have started drawing att ention to the need to improve the system that transmits electricity from power plants to demand centers. Congestion on existing lines, increased energy demand that suggests a need for new electric transmission and the challenge of connecting renewable energy sources to load centers highlight some needs that could be underserved by the existing system in the near future. While improved demand-side management (including energy effi ciency and demand response), bett er utilization of the existing transmission grid, and other strategies (such as distributed

335

Flexible Alternating Current Transmission System Application Guidelines and Operating Strategies  

Science Conference Proceedings (OSTI)

The goals of this project are twofold: to develop flexible alternating current transmission system (FACTS) application guidelines and operating strategies and to provide a technology roadmap for the renewed value proposition of FACTS devices with increased penetration of renewable energy resources, the need for power flow control over existing transmission lines, and tighter voltage regulation at transmission buses. This project focuses on developing technical and economic guidelines for ...

2012-12-17T23:59:59.000Z

336

Energy Transmission and Infrastructure  

SciTech Connect

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

337

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

338

Down hole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

339

Designing electricity transmission auctions  

E-Print Network (OSTI)

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

340

Downhole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2008-01-15T23:59:59.000Z

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Transmission Electron Microscopy (TEM)  

Science Conference Proceedings (OSTI)

...Transmission electron microcopy (TEM) has been used since the 1950s to obtain very high resolution images of microstructures. As TEMs were enhanced to include features such as digitally scanned point beams and energy dispersive x-ray detectors

342

Cloud Transmissivities for Canada  

Science Conference Proceedings (OSTI)

Transmissivities are determined for different cloud types using nine years of hourly irradiance measurements under overcast skies at six Canadian stations. Values for individual stations and for pooled data using irradiances uncorrected for ...

J. A. Davies; M. Abdel-Wahab; J. E. Howard

1985-03-01T23:59:59.000Z

343

Secretary of Energy Announces Approval and Funding for Facilities Upgrade  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Approval and Funding for Facilities Announces Approval and Funding for Facilities Upgrade at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs Secretary of Energy Announces Approval and Funding for Facilities Upgrade at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs February 22, 2006 - 12:09pm Addthis NEWPORT NEWS , VA - Secretary of Energy Samuel W. Bodman today announced that President Bush's Fiscal Year 2007 budget request includes $7 million for the upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at Department of Energy's (DOE) Thomas Jefferson National Accelerator Facility. The secretary also visited with students and teachers from the Newport News area who participate in the lab's highly successful Becoming Enthusiastic about Math and Science (BEAMS) educational

344

Builder Brings Tradition to Efficient Home Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Builder Brings Tradition to Efficient Home Upgrades Builder Brings Tradition to Efficient Home Upgrades Builder Brings Tradition to Efficient Home Upgrades October 15, 2009 - 5:51pm Addthis Joshua DeLung When Tom Wade's grandfather started building single-family homes, he may not have imagined how far his grandson would take the practice. Tom's father followed in the family footsteps and founded Artistic Homes in Albuquerque, N.M., in the mid-1980s. Now, Tom has led the company from simply building quality, affordable homes to innovating ones that are highly energy-efficient. "My grandfather would absolutely love what we're doing today because he had an incredible passion for - and an interest in - craftsmanship and improving the product, which in this case is the home," Tom says. "The fact that we're using science and technology is something he would

345

Forsyth County Slashes Energy Bills with Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades September 30, 2010 - 12:04pm Addthis A new energy management system in Forsyth County’s 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County A new energy management system in Forsyth County's 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Four large projects funded through Recovery Act grant Energy efficient retrofits to save county about $72,000 annually Forsyth County, Georgia has been among the nation's fastest growing counties for the past ten years. Given the growth, officials are working

346

Microsoft Word - CX_MerrittRadioStationUpgrade_2013.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2013 8, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Merritt Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Location: Winton, Chelan County, WA Township 26N, Range 16E, and Section 2 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Merritt Radio Station in the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest (USFS). The proposed radio station upgrade would replace the existing communication building, electrical service, and propane tank with a new building and propane tank in adjacent locations on the

347

Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program < Back Eligibility Commercial Industrial Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Construction Design & Remodeling Manufacturing Sealing Your Home Windows, Doors, & Skylights Ventilation Heat Pumps Commercial Lighting Lighting Insulation Maximum Rebate Up to 100,000 per site per year. Program Info Funding Source Conservation Program Funding Charge State Oregon Program Type Utility Rebate Program Rebate Amount A/C or Heat Pumps: $25-$100/ton Economizer Control Addition: $75/ton Air-Side Economizer Repair: $250 Evaporative Coolers: $100-$300/ton

348

Forsyth County Slashes Energy Bills with Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades September 30, 2010 - 12:04pm Addthis A new energy management system in Forsyth County’s 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County A new energy management system in Forsyth County's 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Four large projects funded through Recovery Act grant Energy efficient retrofits to save county about $72,000 annually Forsyth County, Georgia has been among the nation's fastest growing counties for the past ten years. Given the growth, officials are working

349

County Partners with Siemens on Energy Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Partners with Siemens on Energy Upgrades Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis What does this project do? Allows McHenry County to install cutting edge technology to reduce our energy costs. When you're really committed to energy efficiency and looking at $118,000 in potential energy savings annually, you want to share it. That's the view in McHenry County, Ill., which partnered with Siemens Building Technologies to launch mchenrycounty-eecbg.net to let residents understand the connection between recent energy efficiency projects and C02 emissions. The county, located outside the Chicago metropolitan area, was awarded $2,475,900 in Energy Efficiency and Conservation Block Grant (EECBG) funds through the Recovery Act in November. Through the Recovery Act-funded

350

Tax Incentives for Energy Efficiency Upgrades in Commercial Buildings |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Upgrades in Commercial Energy Efficiency Upgrades in Commercial Buildings Tax Incentives for Energy Efficiency Upgrades in Commercial Buildings On this page you'll find information about the tax deductions available for improving the energy efficiency of commercial buildings, as well as links to qualified software available for calculating these savings. The Energy Policy Act of 2005 (EPACT) offered businesses tax deductions for the costs of improving the energy efficiency of commercial buildings. The Emergency Economic Stabilization Act of 2008 extended provisions in EPACT. The following tax incentives are available under this act. Deduction of the Cost of Energy-Efficient Property Installed in Commercial Buildings Make quick calculations of the estimated energy cost savings from

351

Cool Roofs: An Easy Upgrade | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cool Roofs: An Easy Upgrade Cool Roofs: An Easy Upgrade Cool Roofs: An Easy Upgrade December 14, 2010 - 9:25am Addthis Cathy Zoi Former Assistant Secretary, Office of Energy Efficiency & Renewable Energy What does this mean for me? Dark roofs can be 50 degrees hotter than light roofs. Combined with dark roads and parking lots, dark roofs lead to the 'urban heat island' effect: cities tend to be 2-5 degrees hotter. A cooler roof means energy bills that are up to 10-15% lower because your air conditioner doesn't have to work as hard. Check out Google Earth - the 'view from above' of your favorite American city. And look at the roofs of the office buildings, warehouses, shopping centers, and even the homes. Most of them are probably pretty dark in color - and this means they heat up a lot when the weather is warm -

352

When Energy Efficiency Upgrades and Ghost Stories Meet | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Tertia Speiser Project Officer, Golden Field Office What are the key facts? New heating and cooling equipment has saved the Homewood Public Library thousands of dollars a year. It hasn't done anything about the ghosts, though. I've always thought that the best ghost stories are found in books. But what happens when the building where the books are kept is also a ghost story? Such may be the case with the award-winning public library in Homewood, Alabama, a city of 23,000 just south of Birmingham.

353

Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade March 16, 2011 - 2:58pm Addthis April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs What does this project do? In three hours, enough energy is recovered from the TMC to heat 15 loads of water for L&N's largest-capacity washing machine, and enough water is recovered to fill 1-1/2 loads of that same machine. As the provider of laundry and dry cleaning services for Disneyland Resort's costumes and hospitality supply items, L&N Costume and Linen Service knows a little something about both quantity and quality. Now, with the help of the Gas Technology Institute (GTI) and the Department of Energy, this forward-looking enterprise is embracing new, clean energy

354

County Partners with Siemens on Energy Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

County Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis What does this project do? Allows McHenry County to install cutting edge technology to reduce our energy costs. When you're really committed to energy efficiency and looking at $118,000 in potential energy savings annually, you want to share it. That's the view in McHenry County, Ill., which partnered with Siemens Building Technologies to launch mchenrycounty-eecbg.net to let residents understand the connection between recent energy efficiency projects and C02 emissions. The county, located outside the Chicago metropolitan area, was awarded $2,475,900 in Energy Efficiency and Conservation Block Grant (EECBG) funds through the Recovery Act in November. Through the Recovery Act-funded

355

Potential Peak Load Reductions From Residential Energy Efficient Upgrades  

E-Print Network (OSTI)

The demand for electricity is continuing to grow at a substantial rate. Utilities are interested in managing this growth's peak demand for a number of reasons including: costly construction of new generation capacity can be deferred; the reliability of the distribution network can be improved; and added environmental pollution can be minimized. Energy efficiency improvements, especially through residential programs, are increasingly being used to mitigate this rise in peak demand. This paper examines the potential peak load reductions from residential energy efficiency upgrades in hot and humid climates. First, a baseline scenario is established. Then, the demand and consumption impacts of individual upgrade measures are assessed. Several of these upgrades are then combined into a package to assess the synergistic demand and energy impacts. A sensitivity analysis is then performed to assess the impacts of housing characteristics on estimated demand and energy savings. Finally, the demand, energy, and environmental impacts are estimated at the community level.

Meisegeier, D.; Howes, M.; King, D.; Hall, J.

2002-01-01T23:59:59.000Z

356

Living Comfortably: A Consumer's Guide to Home Energy Upgrades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades March 7, 2013 - 3:15pm Addthis A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL Dr. Richard Knaub Project Leader in Weatherization & Workforce Development at the National Renewable Energy Laboratory Energy audit tools An infrared camera can display temperature differences between surfaces and help determine if a wall is insulated. It can show drafts and moisture, which can lead to mold problems.

357

When Energy Efficiency Upgrades and Ghost Stories Meet | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Tertia Speiser Project Officer, Golden Field Office What are the key facts? New heating and cooling equipment has saved the Homewood Public Library thousands of dollars a year. It hasn't done anything about the ghosts, though. I've always thought that the best ghost stories are found in books. But what happens when the building where the books are kept is also a ghost story? Such may be the case with the award-winning public library in Homewood, Alabama, a city of 23,000 just south of Birmingham.

358

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

359

OVERVIEW OF A RECONFIGURABLE SIMULATOR FOR MAIN CONTROL ROOM UPGRADES IN NUCLEAR POWER PLANTS  

SciTech Connect

This paper provides background on a reconfigurable control room simulator for nuclear power plants. The main control rooms in current nuclear power plants feature analog technology that is growing obsolete. The need to upgrade control rooms serves the practical need of maintainability as well as the opportunity to implement newer digital technologies with added functionality. There currently exists no dedicated research simulator for use in human factors design and evaluation activities for nuclear power plant modernization in the U.S. The new research simulator discussed in this paper provides a test bed in which operator performance on new control room concepts can be benchmarked against existing control rooms and in which new technologies can be validated for safety and usability prior to deployment.

Ronald L. Boring

2012-10-01T23:59:59.000Z

360

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

362

ENERGY STAR Building Upgrade Manual | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

ENERGY STAR Building Upgrade Manual ENERGY STAR Building Upgrade Manual Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Learn the benefits Get started Use Portfolio Manager Save energy Stamp out energy waste Find cost-effective investments Engage occupants Purchase energy-saving products Put computers to sleep Get help from an expert Take a comprehensive approach

363

Status of the ATF Damping Ring BPM Upgrade Project  

Science Conference Proceedings (OSTI)

A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it's finalization are presented.

Briegel, C.; /Fermilab; Eddy, N.; /Fermilab; Haynes, B.; /Fermilab; May, J.; /SLAC; McCormick, D.; /SLAC; Nelson, J.; /SLAC; Nicklaus, D.; /Fermilab; Prieto, P.; /Fermilab; Rechenmacher, R.; /Fermilab; Smith, T.; /SLAC; Teranuma, N.; /KEK, Tsukuba; Urakawa, J.; /KEK, Tsukuba; Voy, D.; /Fermilab; Wendt, M.; /Fermilab; Woodley, M.; /SLAC

2011-12-01T23:59:59.000Z

364

Building Upgrade Manual | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Upgrade Manual Building Upgrade Manual Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

365

High intensity performance and upgrades at the Brookhaven AGS  

SciTech Connect

For the last two years the Brookhaven AGS has operated the slow extracted beam program at record proton intensities. This high beam intensity allowed for the simultaneous operation of three high precision rare kaon decay experiments. The record beam intensities were achieved after the 1.5 GeV Booster was commissioned and a transition jump system, a powerful transverse damper, and an rf upgrade in the AGS were completed. Recently even higher intensity proton synchrotrons are studied for neutron spallation sources or proton driver for a muon collider. Implications of the experiences from the AGS to these proposals and also possible future upgrades for the AGS are discussed.

Roser, T.

1996-12-31T23:59:59.000Z

366

HOM Survey of the First CEBAF Upgrade Style Cavity Pair  

SciTech Connect

The planned upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Laboratory (JLab) requires ten new superconducting rf (SRF) cavity cryomodules to double the beam energy to the envisaged 12 GeV. Adequate cavity Higher Order Mode (HOM) suppression is essential to avoid multipass, multibunch beam break-up (BBU) instabilities of the recirculating beam. We report on detailed HOM surveys performed for the first two upgrade style cavities tested in a dedicated cavity pair cryomodule at 2K. The safety margin to the BBU threshold budget at 12 GeV has been assessed.

Marhauser, Frank; Davis, G; Drury, Michael; Grenoble, Christiana; Hogan, John; Manus, Robert; Preble, Joseph; Reece, Charles; Rimmer, Robert; Tian, Kai

2009-05-01T23:59:59.000Z

367

Energy and Emissions Savings through Insulation Upgrade Projects  

E-Print Network (OSTI)

The presentation demonstrates the value of including insulation system assessment, repairs and upgrades on a facility's physical function and its importance in the overall energy and environmental management program. Financial and environmental benefits are quantified and physical improvements detailed. The presentation will highlight the key components and successful execution of an insulation assessment and upgrade project. This includes: • The extent of the problem • How the current state happened • The stake / reward for plants Specific case studies will be used including Sunoco and Marathon Petroleum

Lettich, M.

2008-01-01T23:59:59.000Z

368

Definition: Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Jump to: navigation, search Dictionary.png Transmission An interconnected group of lines and associated equipment for the movement or transfer of electric energy...

369

Supplement Analysis for the Transmission System Vegetation Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

are discussed below. Planning Steps: 1. Identify facility and the vegetation management need. Work will take place along Custer-Intalco 1 230 kV transmission line. The...

370

Financing a National Transmission Grid: What Are the Issues?  

E-Print Network (OSTI)

The United States requires a substantial investment in transmission capacity over the next several decades. This investment is needed to ensure system reliability, to accommodate growth in demand for electricity, and to ...

Metcalf, Gilbert E.

371

IAAP Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEEDS ASSESSMENT-DECEMBER 2001 NEEDS ASSESSMENT-DECEMBER 2001 Burlington Atomic Energy Commission Plant- Former Worker Program A US DOE funded project conducted by: Dr. Laurence Fuortes, Principal Investigator The University of Iowa College of Public Health Department of Occupational and Environmental Health 5 2940 Steindler Building Iowa City, IA 52242 TEL: 319 335 9819 FAX: 319 335 9200 BACEP-FWP Needs Assessment 1. INTRODUCTION In August of 2000, the University of Iowa College of Public Health initiated a needs assessment study to evaluate whether or not individuals formerly employed by the Department of Energy (DOE) at the Iowa Army Ammunition Plant (IAAP) near Burlington, Iowa, would benefit from a Former Worker Medical Surveillance Program. These workers were employed at IAAP in the atomic weapons industry on what was known at the facility as Line 1 or Division B at the

372

Cultural Resource Investigation for the Materials and Fuels Complex Wastewater System Upgrade at the Idaho National Laboratory  

SciTech Connect

The Materials and Fuels Complex (MFC) located in Bingham County at the Idaho National Laboratory (INL) in southeastern Idaho is considering several alternatives to upgrade wastewater systems to meet future needs at the facility. In April and May of 2010, the INL Cultural Resource Management Office conducted archival searches, archaeological field surveys, and coordination with the Shoshone-Bannock Tribes to identify cultural resources that may be adversely affected by the proposed construction and to provide recommendations to protect any resources listed or eligible for listing on the National Register of Historic Places. These investigations showed that one National Register-eligible archaeological site is located on the boundary of the area of potential effects for the wastewater upgrade. This report outlines protective measures to help ensure that this resource is not adversely affected by construction.

Brenda R. Pace; Julie B raun Williams; Hollie Gilbert; Dino Lowrey; Julie Brizzee

2010-05-01T23:59:59.000Z

373

Interconnection Transmission Planning: Awards | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and...

374

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

ColoradoTransmissionAgencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary...

375

Electricity Transmission, A Primer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

376

Case Studies and Methodologies for Using Distributed Energy Resources for Transmission and Distribution Support Applications  

Science Conference Proceedings (OSTI)

Utility transmission and distribution (T&D) systems require extensive investment for infrastructure upkeep. For some utilities, these investments may require a budget of $50 million or more annually. As much of the nation's T&D system was constructed decades ago, extensive maintenance is necessary simply to continue to operate these systems as designed. In addition, load growth over time is causing many parts of these systems to approach overloading conditions, which typically require upgrades to accommo...

2005-12-20T23:59:59.000Z

377

Transmission Reliability Evaluation of Large Scale System (TRELSS) Software, Version 6.0  

Science Conference Proceedings (OSTI)

TRELSS, Version 6.0 has been upgraded recently. The TRELSS code simulates power transmission systems and allows the reliability of the modeled system to be accurately estimated. TRELSS computes reliability indices using a contingency enumeration approach, which involves selection and evaluation of contingencies, classification of each contingency according to specified failure criteria, and accumulation of reliability indices. Two methods of reliability assessment are used: the System Problem Approach (w...

2003-03-18T23:59:59.000Z

378

Rebates Cut the Price of Big-Time Efficiency Upgrades | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebates Cut the Price of Big-Time Efficiency Upgrades Rebates Cut the Price of Big-Time Efficiency Upgrades February 22, 2010 - 5:52pm Addthis One of the smartest ways for...

379

Considerations for Polarimetric Upgrades to Operational WSR-88D Radars  

Science Conference Proceedings (OSTI)

This paper reports on the steps taken by the National Severe Storms Laboratory (NSSL) to 1) develop open system hardware to facilitate upgrades to the WSR-88D (NEXRAD) radar and 2) improve identification of the type of precipitation and its ...

R. J. Doviak; V. Bringi; A. Ryzhkov; A. Zahrai; D. Zrni?

2000-03-01T23:59:59.000Z

380

Technologies for Upgrading Light Water Reactor Outlet Temperature  

SciTech Connect

Nuclear energy could potentially be utilized in hybrid energy systems to produce synthetic fuels and feedstocks from indigenous carbon sources such as coal and biomass. First generation nuclear hybrid energy system (NHES) technology will most likely be based on conventional light water reactors (LWRs). However, these LWRs provide thermal energy at temperatures of approximately 300°C, while the desired temperatures for many chemical processes are much higher. In order to realize the benefits of nuclear hybrid energy systems with the current LWR reactor fleets, selection and development of a complimentary temperature upgrading technology is necessary. This paper provides an initial assessment of technologies that may be well suited toward LWR outlet temperature upgrading for powering elevated temperature industrial and chemical processes during periods of off-peak power demand. Chemical heat transformers (CHTs) are a technology with the potential to meet LWR temperature upgrading requirements for NHESs. CHTs utilize chemical heat of reaction to change the temperature at which selected heat sources supply or consume thermal energy. CHTs could directly utilize LWR heat output without intermediate mechanical or electrical power conversion operations and the associated thermodynamic losses. CHT thermal characteristics are determined by selection of the chemical working pair and operating conditions. This paper discusses the chemical working pairs applicable to LWR outlet temperature upgrading and the CHT operating conditions required for providing process heat in NHES applications.

Daniel S. Wendt; Piyush Sabharwall; Vivek Utgikar

2013-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Recent Upgrade of the Klystron Modulator at SLAC  

SciTech Connect

The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

2011-11-04T23:59:59.000Z

382

COUNTY OF SAN DIEGO Energy Upgrade San Diego  

E-Print Network (OSTI)

) $ 60,250 San Diego Co. Water Authority (building owner incentives) $ 150,000 San Diego EnergySoft CalCerts, Inc. Strategic Energy Innovations Manpower CBPCA Partnering Clean EnergyCOUNTY OF SAN DIEGO Energy Upgrade San Diego Summary Sheet ARRA EECBG Discretionary Funding

383

Testing of FMI's Coal Upgrading Process  

SciTech Connect

WRI and FMI have collaborated to develop and test a novel coal upgrading technology. Proprietary coal upgrading technology is a fluidized bed-based continuous process which allows high through-puts, reducing the coal processing costs. Processing is carried out under controlled oxidizing conditions at mild enough conditions that compared to other coal upgrading technologies; the produced water is not as difficult to treat. All the energy required for coal drying and upgrading is derived from the coal itself. Under the auspices of the Jointly Sponsored Research Program, Cooperative Agreement DE-FC26-98FT40323, a nominal 400 lbs/hour PDU was constructed and operated. Over the course of this project, several low-rank coals were successfully tested in the PDU. In all cases, a higher Btu, low moisture content, stable product was produced and subsequently analyzed. Stack emissions were monitored and produced water samples were analyzed. Product stability was established by performing moisture readsorption testing. Product pyrophobicity was demonstrated by instrumenting a coal pile.

Vijay Sethi

2009-03-21T23:59:59.000Z

384

Innovative Technology Improves Upgrading Process for Unconventional Oil  

NLE Websites -- All DOE Office Websites (Extended Search)

09, 2013 09, 2013 Innovative Technology Improves Upgrading Process for Unconventional Oil Resources Washington, D.C. - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology. Heavy oil is crude oil that is viscous and requires thermally enhanced oil recovery methods, such as steam and hot water injection, to reduce its viscosity and enable it to flow. The largest U.S. deposits of heavy oil are in California and on Alaska's North Slope. Estimates for the U.S. heavy oil resource total about 104 billion barrels of oil in place - nearly five times the United States' proved reserves. In addition, although no commercial-scale development of U.S. oil sands or oil shale has yet occurred, both represent another potential future domestic unconventional oil resource.

385

High Temperature Calcination - MACT Upgrade Equipment Pilot Plant Test  

SciTech Connect

About one million gallons of acidic, hazardous, and radioactive sodium-bearing waste are stored in stainless steel tanks at the Idaho Nuclear Technology and Engineering Center (INTEC), which is a major operating facility of the Idaho National Engineering and Environmental Laboratory. Calcination at high-temperature conditions (600 C, with alumina nitrate and calcium nitrate chemical addition to the feed) is one of four options currently being considered by the Department of Energy for treatment of the remaining tank wastes. If calcination is selected for future processing of the sodium-bearing waste, it will be necessary to install new off-gas control equipment in the New Waste Calcining Facility (NWCF) to comply with the Maximum Achievable Control Technology (MACT) standards for hazardous waste combustors and incinerators. This will require, as a minimum, installing a carbon bed to reduce mercury emissions from their current level of up to 7,500 to <45 {micro}g/dscm, and a staged combustor to reduce unburned kerosene fuel in the off-gas discharge to <100 ppm CO and <10 ppm hydrocarbons. The staged combustor will also reduce NOx concentrations of about 35,000 ppm by 90-95%. A pilot-plant calcination test was completed in a newly constructed 15-cm diameter calciner vessel. The pilot-plant facility was equipped with a prototype MACT off-gas control system, including a highly efficient cyclone separator and off-gas quench/venturi scrubber for particulate removal, a staged combustor for unburned hydrocarbon and NOx destruction, and a packed activated carbon bed for mercury removal and residual chloride capture. Pilot-plant testing was performed during a 50-hour system operability test January 14-16, followed by a 100-hour high-temperature calcination pilot-plant calcination run January 19-23. Two flowsheet blends were tested: a 50-hour test with an aluminum-to-alkali metal molar ratio (AAR) of 2.25, and a 50-hour test with an AAR of 1.75. Results of the testing indicate that sodium-bearing waste can be successfully calcined at 600 C with an AAR of 1.75. Unburned hydrocarbons are reduced to less than 10 ppm (7% O2, dry basis), with >90% reduction of NOx emissions. Mercury removal by the carbon bed reached 99.99%, surpassing the control efficiency needed to meet MACT emissions standards. No deleterious impacts on the carbon bed were observed during the tests. The test results imply that upgrading the NWCF calciner with a more efficient cyclone separator and the proposed MACT equipment can process the remaining tanks wastes in 3 years or less, and comply with the MACT standards.

Richard D. Boardman; B. H. O& #39; Brien; N. R. Soelberg; S. O. Bates; R. A. Wood; C. St. Michel

2004-02-01T23:59:59.000Z

386

Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

Science Conference Proceedings (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the technical feasibility and cost of upgrading low-BTU methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys modular microchannel process technology. The objective of Phase II is to demonstrate the process at the bench-scale. Natural gas upgrading systems have six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration has been initiated. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study. The project is on schedule and on budget. Task 4, a bench-scale demonstration of the ultra-fast TSA system is complete. Rapid thermal swing of an adsorbent bed using microchannels has been successfully demonstrated and the separation of a 70% methane and 30% nitrogen was purified to 92% methane. The bench-scale demonstration unit was small relative to the system dead volume for the initial phase of experiments and a purge step was added to sweep the dead volume prior to desorbing the bed and measuring purity. A technical and economic feasibility assessment was completed in Task 3. The proposed Velocys technology appears feasible for the methane upgrading market. Evaluated categories include adsorbent selection, rapid-cycle valve selection, microchannel manufacturability assessment, and system design and cost. The selected adsorbent, granular microporous carbon from either Barnaby-Sutcliffe or Calgon, experimentally demonstrated sufficient methane capacity under differential temperature at 100 pounds per square inch gauge. Several valve options were identified, including candidates that can operate millions of cycles between refurbishment. The microchannel adsorber and desorber designs were made using internal Velocys manufacturability standards, and the associated costs are acceptable as included with the complete nitrogen rejection unit (NRU) cost projection. A system design and cost estimate was completed for the NRU section of the methane upgrading system. As integrated into the complete system, the cost is in line with the market requirement.

Anna Lee Tonkovich

2005-07-01T23:59:59.000Z

387

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

388

Project L-070, ``300 Area process sewer piping system upgrade`` Project Management Plan  

Science Conference Proceedings (OSTI)

This document is the project management plan for Project L-070, 300 Area process sewer system upgrades.

Wellsfry, H.E.

1994-09-16T23:59:59.000Z

389

Standard Work Specifications for Single-Family Home Energy Upgrades Summary (Fact Sheet)  

SciTech Connect

The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numerous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a unique source for defining high-quality home energy upgrades, establishing clear expectations for homeowners, contractors, trainers, workers, program administrators, and organizations that provide financing for energy upgrades.

Not Available

2012-11-01T23:59:59.000Z

390

Project Management Plan (PMP), W-364, 209E septic system upgrade, 200 East Area  

SciTech Connect

The document is the Project Management Plan (PMP) of the design and installation of the 209E Septic System Upgrade.

Lott, D.T.

1994-09-20T23:59:59.000Z

391

EBR-II argon cooling system restricted fuel handling I and C upgrade  

SciTech Connect

The instrumentation and control of the Argon Cooling System (ACS) restricted fuel handling control system at Experimental Breeder Reactor II (EBR-II) is being upgraded from a system comprised of many discrete components and controllers to a computerized system with a graphical user interface (GUI). This paper describes the aspects of the upgrade including reasons for the upgrade, the old control system, upgrade goals, design decisions, philosophies and rationale, and the new control system hardware and software.

Start, S.E.; Carlson, R.B.; Gehrman, R.L. [Argonne National Lab., Idaho Falls, ID (United States). Engineering Div.

1995-06-01T23:59:59.000Z

392

Extension-Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

SciTech Connect

The purpose of this project is to develop a cost effective technology for upgrading coal mine methane to natural gas pipeline quality. Nitrogen rejection is the most costly step with conventional technology and emerging competitive technology. Significant cost reductions to this step will allow for the cost effective capture and utilization of this otherwise potent greenhouse gas. The proposed approach is based on the microchannel technology platform that Velocys is developing to commercialize compact and cost efficient chemical processing technology. For this application, ultra fast thermal swing adsorption is enabled by the very high rates of heat transfer enabled by microchannels. Natural gas upgrading systems have six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration has been initiated. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study. Initial performance results for the Velocys TSA technology were promising. Velocys has also completed initial discussions with several prospective users of the technology and received positive market feedback. Some of the factors that create an attractive opportunity for the technology include the sustained high prices for natural gas, the emerging system of carbon credits, and continued focus on reducing coal mine emissions. While market interest has been confirmed, improvements and optimization are necessary to move the technology to a point that will enable commercial investment in the technology scale-up. In particular, prospective industry collaborators are interested in seeing validation that the technology can meet real-world conditions, including handling impurities, meeting purity and recovery targets (which requires low dead volume), and meeting cost and manufacturability goals. In this quarter, the system adsorbent has been selected--a granular mesoporous carbon. An overall change to the system to move to a phase change fluid for heating and cooling has been projected to significantly reduce the thermal lag of adsorption and desorption unit. Modeling work using the properties of powder carbon has shown that the overall system performance can be achieved, thus negating the need for structured adsorbents. A revised testing protocol for powder adsorbents has been initiated.

Anna Lee Tonkovich

2006-04-01T23:59:59.000Z

393

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

394

Pantex Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pantex Needs Assessment Pantex Needs Assessment Phase I Summary and Recommendation Based upon the availability of information to access former workers, and given the knowledge regarding past exposures to hazardous agents, it is recommended that a Phase II examination program be established for former Pantex workers. This will be in keeping with other DOE mandates and programs, and will assist with the current DOE compensation program. I. Introduction and Background The Department of Energy has established a program to meet the medical oversight needs of former workers who worked at a variety of Department of Energy facilities in connection with the nuclear programs of the United States. It has been recognized that these workers might have been exposed to potentially hazardous materials, and that they were deserving of medical

395

Low rank coal upgrading in a flow of hot water  

Science Conference Proceedings (OSTI)

Simultaneous hydrothermal degradation and extraction at around 350{sup o}C using flowing solvent as a reaction/extraction medium were proposed for upgrading brown coal, more specifically, for converting brown coal into several fractions having different molecular weight and chemical structure under mild conditions. When an Australian brown coal, Loy Yang coal, was treated by water at 350{sup o}C under 18 MPa, the coal was separated into four fractions: gaseous product by 8% yield, water-soluble extract at room temperature (soluble) by 23% yield, extract precipitates as solid at room temperature (deposit) by 23% yield, and residual coal (upgraded coal) by 46% yield on daf basis. The separation was found to be realized by in situ extraction of low-molecular-weight substances released from coal macromolecular structure and/or those generated by hydrothermal decomposition reactions at 350{sup o}C. The solid products obtained, deposit and upgraded coal, were characterized in detail to examine the possibility of their effective utilization as solid fuel and chemical feed stock. The upgraded coal showed higher heating value and higher gasification reactivity than the parent coal, indicating that the upgraded coal can be a better solid fuel than the parent coal. The solid extract, deposit, was found to show thermoplasticity at less than 200{sup o}C, suggesting the possibility of utilizing the deposit as a raw material of high performance carbon materials. Several variables affecting the performance of the proposed method are also examined in detail in this paper. 12 refs., 8 figs., 3 tabs.

Masato Morimoto; Hiroyuki Nakagawa; Kouichi Miura [Kyoto University, Kyoto (Japan). Department of Chemical Engineering

2009-09-15T23:59:59.000Z

396

Electric Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

397

Merchant Transmission Investment  

E-Print Network (OSTI)

merchant transmission model of the type described above, though Australia has adopted a mixed merchant and regu- 6 lated transmission model.3 However, recent academic proposals,4 as well as FERC’s July 2002 Standard Market Design (SMD) proposals, call... that a nodal or locational marginal pricing (LMP) system is in place with attributes similar to those being proposed by the U.S. Federal Energy Regulatory Commission (FERC) in its SMD proposals and to what is in operation in New 3Two merchant lines...

Joskow, Paul; Tirole, Jean

2004-06-16T23:59:59.000Z

398

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

399

NREL: Energy Analysis: Transmission Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

400

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

402

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission lines between two adjacent periodic intersections to be longer than the other. 5 figs.

Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; deGrassie, J.S.

1990-03-02T23:59:59.000Z

403

He Puff System For Dust Detector Upgrade  

SciTech Connect

Local detection of surface dust is needed for the safe operation of next-step magnetic fusion devices such as ITER. An electrostatic dust detector, based on a 5 cm x 5 cm grid of interlocking circuit traces biased to 50 V, has been developed to detect dust on remote surfaces and was successfully tested for the first time on the National Spherical Torus Experiment (NSTX). We report on a helium puff system that clears residual dust from this detector and any incident debris or fibers that might cause a permanent short circuit. The entire surface of the detector was cleared of carbon particles by two consecutive helium puffs delivered by three nozzles of 0.45 mm inside diameter. The optimal configuration was found to be with the nozzles at an angle of 30o with respect to the surface of the detector and a helium backing pressure of 6 bar. __________________________________________________

B. Rais, C.H. Skinner A.L. Roquemore

2010-10-01T23:59:59.000Z

404

Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.  

Science Conference Proceedings (OSTI)

Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

405

THE COUNCIL OF STATE GOVERNMENTS THE ELECTRIC TRANSMISSION LINE SITING COMPACT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COUNCIL OF STATE GOVERNMENTS COUNCIL OF STATE GOVERNMENTS THE ELECTRIC TRANSMISSION LINE SITING COMPACT LEGISLATIVE BRIEFING Background and Summary Background and Need The siting of interstate transmission lines has long been a problem that has vexed both states and the federal government. With the expected growth in electricity demand, coupled with the need to bring renewable energy to market and the necessity to enhance and secure the nation's energy infrastructure, the need for added transmission capacity has never been more apparent. National need and parochial interests, however, often do not align and have led to an underdeveloped and overstressed electricity transmission system.

406

National Account Customer Needs  

Science Conference Proceedings (OSTI)

A survey conducted in the mid-1990s explored the communications-based services national account customers desired to support their energy procurement and utilization needs. The new study reported here re-interviewed many participants from the original survey to identify changes in their thinking and practices in the light of their experience over the last 5 to 7 years.

2002-05-17T23:59:59.000Z

407

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

1993-01-01T23:59:59.000Z

408

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

409

Transmission SEAB Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

410

Transmission planning in China  

Science Conference Proceedings (OSTI)

Though China is well along in restructuring its power markets, it still has some way to travel before economic considerations receive adequate weight in transmission planning decisions. Adoption of more sophisticated tools such as multi-agent modeling will help China continue in its progress in achieving this. (author)

Dong, Jun; Zhang, Jing

2009-07-15T23:59:59.000Z

411

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

412

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

involves the construction of an approximate 1000 mile HVAC and HVDC transmission project from British ACSR. (Northern Segment) b) A 3000 MVA, 500 kV HVAC to +/-500 kV HVDC Converter at the NEO Station. c) A +/-500 kV HVDC line from the NEO Station to the proposed Collinsville Substation in the San Francisco Bay

413

LAP Transmission Rate  

NLE Websites -- All DOE Office Websites (Extended Search)

LAP Transmission Rate 4.50 4.00 3.82 3.50 3.00 of 2.50 c 0 2.I2 2.68 I 3: 2.00 1.50 1.00 0.50 0.00 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012...

414

Transmission Services J7000  

NLE Websites -- All DOE Office Websites (Extended Search)

C T D E S E R T S O U T H W E S T R E G I O N R O C K Y M O U N T A I N R E G I O N Transmission Services J7000 Ensuring the Reliability of the Bulk Electric System Western's...

415

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

Kotlyar, O.M.

1997-03-25T23:59:59.000Z

416

Transmission Enhancement Technology Report  

E-Print Network (OSTI)

to increase transmission capability. Section 3 documents existing technologies used in the industry today the traditional types of design alternatives used by Western and the electric industry. The primary system operate at three times the ampacity of Aluminum Conductor Steel Reinforced (ACSR) conductor and has a much

417

California/Transmission/State Regulations | Open Energy Information  

Open Energy Info (EERE)

California/Transmission/State Regulations California/Transmission/State Regulations < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State Siting Process Transmission lines 200 kV or greater are required to undergo a two-part state siting and permitting process with the California Public Utility Commission (CPUC). One part of the process will analyze the need for the project and consists of obtaining a Certificate of Public Convenience and Necessity (CPCN) from the California Energy Commission (CEC). The other part of the process will analyze environmental and community impacts in the

418

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

419

July 31 Webinar to Provide Guidance on Transmission Feasibility and System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 31 Webinar to Provide Guidance on Transmission Feasibility and July 31 Webinar to Provide Guidance on Transmission Feasibility and System Impact Studies July 31 Webinar to Provide Guidance on Transmission Feasibility and System Impact Studies July 24, 2013 - 10:32am Addthis The U.S. Department of Energy (DOE) Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series webinar, "Conducting Transmission Feasibility and System Impact Studies," on Wednesday, July 31, 2013, from 1:00 p.m. to 2:30 p.m. Eastern Time. The development of more renewable energy resources raises challenges and opportunities for the electric grid relating to upgrades and potential new construction. Likewise, commercial-scale renewable energy development

420

Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

Science Conference Proceedings (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the technical feasibility and cost of upgrading low-BTU methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys modular microchannel process technology. The objective of Phase II is to demonstrate the process at the bench scale. The project is on schedule and on budget. A technical and economic feasibility assessment was completed in Task 3. The proposed Velocys technology appears feasible for the methane upgrading market. Evaluated categories include adsorbent selection, rapid-cycle valve selection, microchannel manufacturability assessment, and system design and cost. The selected adsorbent, granular microporous carbon from either Barnaby-Sutcliffe or Calgon, experimentally demonstrated sufficient methane capacity under differential temperature at 100 pounds per square inch gauge. Several valve options were identified, including candidates that can operate millions of cycles between refurbishment. The microchannel adsorber and desorber designs were made using internal Velocys manufacturability standards, and the associated costs are acceptable as included with the complete nitrogen rejection unit (NRU) cost projection. A system design and cost estimate was completed for the NRU section of the methane upgrading system. As integrated into the complete system, the cost is in line with the market requirement. The system has six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration will be initiated in the next fiscal year. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study.

Anna Lee Tonkovich

2004-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

LANL Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Medical Screening Program for Medical Screening Program for Former Los Alamos National Laboratory Workers United States Department of Energy Office of Occupational Medicine and Medical Surveillance Final Phase I Needs Assessment Report submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America Los Alamos National Laboratory's Environment, Safety and Health Division National Jewish Medical and Research Center February 1999 Department of Environmental Health Sciences 615 North Wolfe Street Baltimore, Maryland 21205 Development of a Medical Screening Program for Former.Los Alamos National Laboratory Workers Phase I Needs Assessment Submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America

422

LANL Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Medical Screening Program for Medical Screening Program for Former Los Alamos National Laboratory Workers United States Department of Energy Office of Occupational Medicine and Medical Surveillance Final Phase I Needs Assessment Report submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America Los Alamos National Laboratory's Environment, Safety and Health Division National Jewish Medical and Research Center February 1999 Department of Environmental Health Sciences 615 North Wolfe Street Baltimore, Maryland 21205 Development of a Medical Screening Program for Former.Los Alamos National Laboratory Workers Phase I Needs Assessment Submitted by Johns Hopkins University School of Hygiene and Public Health Laborers' Health & Safety Fund of North America

423

needs_assessment.html  

NLE Websites -- All DOE Office Websites (Extended Search)

Education Office Needs Assessment Workshop Education Office Needs Assessment Workshop On October 2, 40 educators from 15 school districts met at Fermilab to discuss the status of science education in the context of state and national frameworks. Districts were selected at random from DuPage and Kane counties, and superintendents selected a team to represent the district at the workshop. The group provided input to the Education Office regarding future program direction. Over the next few months the Education Office will be reviewing program offerings in light of the issues raised below. In the meantime, we invite you to visit the Teacher Resource Center which serves as our clearinghouse or call Susan Dahl at 630-840-3094 for assistance. If you would like a scientist to visit your classroom, participate in a career fair or serve as

424

VENTILATION NEEDS DURING CONSTRUCTION  

Science Conference Proceedings (OSTI)

The purpose of this analysis is to determine ventilation needs during construction and development of the subsurface repository and develop systems to satisfy those needs. For this analysis, construction is defined as pre-emplacement excavation and development is excavation that takes place simultaneously with emplacement. The three options presented in the ''Overall Development and Emplacement Ventilation Systems'' analysis (Reference 5.5) for development ventilation will be applied to construction ventilation in this analysis as well as adding new and updated ventilation factors to each option for both construction and development. The objective of this analysis is to develop a preferred ventilation system to support License Application Design. The scope of this analysis includes: (1) Description of ventilation conditions; (2) Ventilation factors (fire hazards, dust control, construction logistics, and monitoring and control systems); (3) Local ventilation alternatives; (4) Global ventilation options; and (5) Evaluation of options.

C.R. Gorrell

1998-07-23T23:59:59.000Z

425

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

Science Conference Proceedings (OSTI)

The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS and WinDS). The authors and general location of the 40 detailed transmission studies included in our review are illustrated in Figure ES-1. As discussed in the body of the report, these studies vary considerably in scope, authorship, objectives, methodology, and tools. Though we recognize this diversity and are cognizant that comparisons among these studies are therefore somewhat inappropriate, we nonetheless emphasize such simple comparisons in this report. We do so in order to improve our understanding of the range of transmission costs needed to access greater quantities of wind, and to highlight some of the drivers of those costs. In so doing, we gloss over many important details and differences among the studies in our sample. In emphasizing simple comparisons, our analysis focuses primarily on the unit cost of transmission implied by each of the studies. The unit cost of transmission for wind in $/kW terms on a capacity-weighted basis is estimated by simply dividing the total transmission cost in a study by the total amount of incremental generation capacity (wind and non-wind) modeled in that study. In so doing, this metric assumes that within any individual study all incremental generation capacity imposes transmission costs in proportion to its nameplate capacity rating. The limitations to this approach are described in some detail in the body of the report.

Mills, Andrew D.; Wiser, Ryan; Porter, Kevin

2009-02-02T23:59:59.000Z

426

The AGS main magnet power supply upgrade  

SciTech Connect

The AGS Main Magnet Power Supply consists of a group of thyristor controlled power converters that operate from full rectify to full invert. In order to minimize ripple during the critical periods of injection and extraction 24 pulse converters are used for these portions of the cycle. The maximum voltage available in this mode is nominally 2,000 volts. The converters that are functional during this portion of the cycle are called the flat-top bank or ``F`` bank modules. During acceleration and invert where voltages of up to 12,000 volts are needed and where the ripple requirements are less stringent, groups of twelve pulse converters are operational. These converters are called the Pulsed bank or ``P`` bank modules. The original controlled rectifier system consisted of 96 large mercury filled excitron tubes divided equally between the P bank and F bank converters. These devices were extremely durable and ran successfully for over twenty years. It was, decided to replace the excitron farm with multiple arrangements of three-phase, full-wave, bridge modules that utilize silicon controlled rectifiers (SCR`s or thyristors) as the switching element. In order to match the existing transformer connections and buswork, eight identical modules were required; four for the P bank system and four for the F bank system. In order to reduce noise pickup and provide electrical isolation the high level SCR gate triggers are provided via fiberoptic cable. The status of various parameters such as water flow, auxiliary power supply performance, trigger circuitry failure, over voltage, overcurrent, and loss of phase reference are monitored via a programmable logic controller (PLCs). The PLCs use isolated input and output modules for various voltage levels from TTL to 150 Vdc to 125 Vac. These devices are extremely flexible and have allowed modifications and improvements that have enhanced the performance over any equivalent hard wired system.

Sandberg, J.N.; Casella, R.; Geller, J.; Marneris, I.; Soukas, A.; Schumburg, N.

1995-05-01T23:59:59.000Z

427

D Note 3563 LED Pulser System for the D Muon Upgrade Scintillation Counters  

E-Print Network (OSTI)

We present the technical design for an LED based pulser system for the D Upgrade Muon Scintillation counters. For Run II, accurate timing information from the scintillation counters is imperative for the proper performance of the muon triggers. The LED Pulser System will serve in the commissioning of the counters and for the continuous monitoring of the PMTs ' performances and gains. A detailed description of the system is presented, as well as the results of tests on individual components and integrated system. Proceedures for production, assembly, quality control, installation, and commissioning are presented. Cost estimates and resource needs to complete the system are presented, as well as an estimated schedule. From the test results, the D LED Pulser System performs at a level exceeding speci cations for a fraction of the initial cost estimated for performing the required tasks.

Pierrick Hanlet Matthew Marcus; Al Ito; Bob Jones; Tom Regan; B. S. Acharya; Juan Pablo Negret; Manuel Zanabria

1999-01-01T23:59:59.000Z

428

Multiple Use of Existing Transmission Corridors  

Science Conference Proceedings (OSTI)

Multiple use utility corridors can provide significant benefits for the utilities and the public. However, increasing the power flow in the power system can raise compatibility issues with other utilities or systems that share the corridor. This report provides case studies of three common corridors for which compatibility issues were raised as a result of planned increases in power transmission capacity. The case studies review the criteria used to evaluate compatibility and the need for mitigation meas...

2007-12-18T23:59:59.000Z

429

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

430

Investment and Upgrade in Distributed Generation under Uncertainty  

NLE Websites -- All DOE Office Websites (Extended Search)

Investment and Upgrade in Distributed Generation under Uncertainty Investment and Upgrade in Distributed Generation under Uncertainty Speaker(s): Afzal Siddiqui Karl Maribu Date: September 4, 2008 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Galen Barbose The ongoing deregulation of electricity industries worldwide is providing incentives for microgrids to use small-scale distributed generation (DG) and combined heat and power (CHP) applications via heat exchangers (HXs) to meet local energy loads. Although the electric-only effciency of DG is lower than that of central-station production, relatively high tariff rates and the potential for CHP applications increase the attractiveness of on-site generation. Nevertheless, a microgrid contemplating the installation of gas-fired DG has to be aware of the uncertainty in the

431

Microsoft Word - CX_MetalineRadioStationUpgrade_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 11, 2012 July 11, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Metaline Radio Station Upgrade Project Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Metaline Falls, Pend Orielle County, WA Township 40N, Range 43E, Section 31 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade its Metaline Radio Station in the Sullivan Lake Ranger District of the Colville National Forest. BPA is coordinating with the US Forest Service (USFS) to ensure the existing land use agreement is modified to adequately address

432

Upgrading the Radioactive Waste Management Infrastructure in Azerbaijan  

Science Conference Proceedings (OSTI)

Radionuclide uses in Azerbaijan are limited to peaceful applications in the industry, medicine, agriculture and research. The Baku Radioactive Waste Site (BRWS) 'IZOTOP' is the State agency for radioactive waste management and radioactive materials transport. The radioactive waste processing, storage and disposal facility is operated by IZOTOP since 1963 being significantly upgraded from 1998 to be brought into line with international requirements. The BRWS 'IZOTOP' is currently equipped with state-of-art devices and equipment contributing to the upgrade the radioactive waste management infrastructure in Azerbaijan in line with current internationally accepted practices. The IAEA supports Azerbaijan specialists in preparing syllabus and methodological materials for the Training Centre that is currently being organized on the base of the Azerbaijan BRWS 'IZOTOPE' for education of specialists in the area of safety management of radioactive waste: collection, sorting, processing, conditioning, storage and transportation. (authors)

Huseynov, A. [Baku Radioactive Waste Site IZOTOP, Baku (Azerbaijan); Batyukhnova, O. [State Unitary Enterprise Scientific and Industrial Association Radon, Moscow (Russian Federation); Ojovan, M. [Sheffield Univ., Immobilisation Science Lab. (United Kingdom); Rowat, J. [International Atomic Energy Agency, Dept. of Nuclear Safety and Security, Vienna (Austria)

2007-07-01T23:59:59.000Z

433

MFRSR Head Refurbishment, Data Logger Upgrade and Calibration Improvements  

NLE Websites -- All DOE Office Websites (Extended Search)

MFRSR Head Refurbishment, Data Logger Upgrade MFRSR Head Refurbishment, Data Logger Upgrade and Calibration Improvements Gary Hodges, CIRES/NOAA and John Schmelzer, PNL gary.hodges@noaa.gov, john.schmelzer@pnl.gov 17th Annual ARM Science Team Meeting 26-30 March 2006 Monterey, CA Head Refurbishment The Process Includes: * New filter detectors * Relocate internal thermistors * New connectors * Gain resistors moved to head * Improved insulation The Finished Heads: * Are lamp calibrated * Have filter profiles measured * Cosine characterized * Are out-of-band tested What Does This Mean For Data Users? * Fewer data gaps * Fewer DQRs * Confidence in the data * Well calibrated data Calibration Improvements 5 6 7 8 0 2 4 6 Airmass ln Direct Data will now be calibrated by the Langley method Extrapolate to TOA to get V 0 Benefits of Langley vs. Lamp calibrations:

434

HERA Luminosity Upgrade Magnet Production | Superconducting Magnet Division  

NLE Websites -- All DOE Office Websites (Extended Search)

HERA Luminosity Upgrade Magnet Production HERA Luminosity Upgrade Magnet Production Photos taken on or before 12-May-2000. GO horizontal test setup GO horizontal test setup view toward lead tower GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup lead tower feedthroughs Close up of lead tower feedthroughs lead tower feedthroughs Close up of lead tower feedthroughs lead tower feedthroughs Close up of lead tower feedthroughs GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO Coldmass GO Coldmass GO sextupole coil GO sextupole coil GO quadrupole coil lead end GO quadrupole coil lead end

435

Microsoft Word - CX_TunkRadioStationUpgrade_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 30, 2012 May 30, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Tunk Mountain Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Synarep, Okanogan County, WA Township 35N, Range 29E, and Section 8 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Tunk Mountain Radio Station in the Tonasket Ranger District of the Okanogan-Wenatchee National Forest. BPA is coordinating with the U.S. Forest Service (USFS) to ensure the existing land use permit is

436

Microsoft Word - AlbionButteRSCommunicationUpgrade-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Albion Butte Radio Station Communication Upgrade Budget Information: Work Order # 00253466 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Location: Cassia County, Idaho - Section 19, Township 11 South, Range 26 East of the Nibbs Creek Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade the communication building and equipment at BPA's Albion Butte Radio Station located in Cassia County, ID. This project is part of an

437

Microsoft Word - Holcomb and Naselle Communication Upgrade CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2011 6, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Holcomb Radio Station and Naselle Substation Communication Upgrade Project Budget Information: Work Order # 00253203 and # 00253206 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Locations: Holcomb Radio Station: Pacific County, Washington - Township 13 North, Range 7 West, Section 30 of the Lebam Quadrangle Naselle Substation: Pacific County, Washington - Township 10 North, Range 9 West, Section 4 of the Oman Ranch Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to upgrade the communication equipment at

438

Posted CX Q14 Sprinkler System Upgrade.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(NEPA) Categorical Exclusion (eX) (NEPA) Categorical Exclusion (eX) Determination Summary Form Q14 Sprinkler System Upgrade Project REFERENCE J 10 CFR Part 1021 , Department of Energy National Environmental Policy Act Implementation Procedures, Subpart 0 , Typical Classes of Actions PROJECT SCOPE DISCUSSION The project scope will upgrade the Q14 sprinkler system to meet exposed plastic design basis requirements by installing a fire pump and performing modifications to the Q14 sprinkler piping. The fire pump will be a pre-assembled skid system with enclosure diesel powered pump and associated diesel storage tank. The fire pump assembly wi ll be located on a foundation pad in the grassy area ,;!orthwest of 014. Electrical work will include providing general power to the fire pump building and fire pump control/alarm wiring to a fire alarm panel in the 014

439

Criticality benchmark comparisons leading to cross-section upgrades  

Science Conference Proceedings (OSTI)

For several years criticality benchmark calculations with COG. COG is a point-wise Monte Carlo code developed at Lawrence Livermore National Laboratory (LLNL). It solves the Boltzmann equation for the transport of neutrons and photons. The principle consideration in developing COG was that the resulting calculation would be as accurate as the point-wise cross-sectional data, since no physics computational approximations were used. The objective of this paper is to report on COG results for criticality benchmark experiments in concert with MCNP comparisons which are resulting in corrections an upgrades to the point-wise ENDL cross-section data libraries. Benchmarking discrepancies reported here indicated difficulties in the Evaluated Nuclear Data Livermore (ENDL) cross-sections for U-238 at thermal neutron energy levels. This led to a re-evaluation and selection of the appropriate cross-section values from several cross-section sets available (ENDL, ENDF/B-V). Further cross-section upgrades anticipated.

Alesso, H.P.; Annese, C.E.; Heinrichs, D.P.; Lloyd, W.R.; Lent, E.M.

1993-03-01T23:59:59.000Z

440

Jefferson Lab 12 GeV CEBAF Upgrade  

Science Conference Proceedings (OSTI)

The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at ~6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

Claus Rode

2010-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

MODTRAN cloud and multiple scattering upgrades with application to AVIRIS  

Science Conference Proceedings (OSTI)

Recent upgrades to the MODTRAN atmospheric radiation code improve the accuracy of its radiance predictions, especially in the presence of clouds and thick aerosols, and for multiple scattering in regions of strong molecular line absorption. The current public-released version of MODTRAN (MODTRAN3.7) features a generalized specification of cloud properties, while the current research version of MODTRAN (MODTRAN4) implements a correlated-k (CK) approach for more accurate calculation of multiple scattered radiance. Comparisons to cloud measurements demonstrate the viability of the CK approach. The impact of these upgrades on predictions for AVIRIS viewing scenarios is discussed for both clear and clouded skies; the CK approach provides refined predictions for AVIRIS nadir and near-nadir viewing.

Berk, A.; Bernstein, L.S.; Acharya, P.K.; Robertson, D.C.; Adler-Golden, S.M. [Spectral Sciences, Inc., Burlington, MA (United States)] [Spectral Sciences, Inc., Burlington, MA (United States); Anderson, G.P.; Chetwynd, J.H. [Air Force Research Lab., Hanscom AFB, MA (United States). Geophysics Directorate] [Air Force Research Lab., Hanscom AFB, MA (United States). Geophysics Directorate

1998-09-01T23:59:59.000Z

442

Transmission Developers Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

443

Transmission Siting_071508.indd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

444

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

445

Federal Finance Facilities Available for Energy Efficiency Upgrades  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finance Facilities Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2 Contents 1 Foreword ................................................................................................................................... 5 2 Acknowledgements ................................................................................................................... 6 3 Federal Finance Facilities At-A-Glance ................................................................................... 7 3.1 Matrix of Federal Finance Facilities by Type and Agency .............................................. 7 4 Profiles of Federal Finance Facilities Available for Clean Energy .......................................... 8

446

Requirements Engineering for Digital Upgrades: Specification, Analysis, and Tracking  

Science Conference Proceedings (OSTI)

As nuclear power plants upgrade their instrumentation and control (I&C) systems with digital equipment to continue meeting safety and reliability requirements while controlling operating costs, the transition to the new technology has brought new challenges in properly specifying and confirming the correct performance of digital systems and devices. This guideline describes an approach that utilities can use to refine and improve their processes for developing and verifying requirements for digital upgra...

1997-12-09T23:59:59.000Z

447

Seismic review of vault for MFTF upgrade project  

SciTech Connect

This letter report was prepared in accordance with the scope of work for the preconceptual seismic evaluation of the (..cap alpha.. + T) Tandem Mirror Fusion Machine concrete vault. The scope of the work was developed with the assistance of the Bechtel site representative Dr. Sunil Ghose. The report contains comments and preconceptual recommendations on wall upgrading for an 150-ton crane installation, concrete vault seismic capability for (..cap alpha.. + T) conditions, and recommendations for future work.

Franklin, H.A.

1983-09-29T23:59:59.000Z

448

Snowmass White Paper CMS Upgrade: Forward Lepton-Photon System  

E-Print Network (OSTI)

This White Paper outlines a proposal for an upgraded forward region to extend CMS lepton (e, mu) and photon physics reach out to 2.2

Bilki, Burak; Onel, Yasar; Winn, David R; Yetkin, Taylan

2013-01-01T23:59:59.000Z

449

I&C Upgrades for Nuclear Plants -- Desk Reference 1997  

Science Conference Proceedings (OSTI)

To assist utilities in designing, implementing, and managing digital upgrades of instrumentation and control systems, EPRI has produced a set of documents that address the key technical and regulatory issues. However, the aggregate now comprises several thousand pages of printed materials, and it is simply not practical for a utility engineer to become familiar with all of it. This document provides brief descriptions of the available documents, along with navigation aides to quickly steer the user to th...

1997-12-08T23:59:59.000Z

450

Commissioning Results of the Upgraded Neutralized Drift Compression Experiment  

SciTech Connect

Recent changes to the NDCX beamline offer the promise of higher charge compressed bunches (>15nC), with correspondingly large intensities (>500kW/cm2), delivered to the target plane for ion-beam driven warm dense matter experiments. We report on commissioning results of the upgraded NDCX beamline that includes a new induction bunching module with approximately twice the volt-seconds and greater tuning flexibility, combined with a longer neutralized drift compression channel.

Lidia, S.M.; Roy, P.K.; Seidl, P.A.; Waldron, W.L.; Gilson, E.P.

2009-04-30T23:59:59.000Z

451

UPGRADE OF INSTRUMENTATION FOR PURDUE REACTOR PUR-1, PHASE 3  

Science Conference Proceedings (OSTI)

The major objective of this program is to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective one project on design and installation of interface cards for channel four detector was considered. This report is the final report and gives the efforts and progress achieved on these projects from August 2002 to July 2004.

S. T. Revankar

2004-09-24T23:59:59.000Z

452

Status of Centralized Environmental Creep Testing Facility Preparation and Upgrade  

SciTech Connect

Because the ASME Codes do not cover environmental issues that are crucial in the design and construction of VHTR system, investigation of long-term impure helium effects on metallurgical stability and properties becomes very important. The present report describes the development of centralized environmental creep testing facility, its close collaborations with the experiments in low velocity helium recirculation loop, important lessons learned, upgrades in system design in FY06, and current status of the development.

Ren, Weiju [ORNL; Battiste, Rick [ORNL

2006-10-01T23:59:59.000Z

453

Assessment of Electrostatic Precipitator (ESP) Upgrade Options: Survey and Analysis  

Science Conference Proceedings (OSTI)

The electrostatic precipitator (ESP) performance analysis in this interim report is intended to aid in selection of the most effective upgrade technologies, which are identified and discussed in EPRI report 1023077, ESP Performance Optimization. This second in a series of reports contains a new, first-order procedure for evaluating the performance of an existing ESP in order to determine which of the technologies discussed in the earlier report will produce the greatest improvement in ...

2013-06-15T23:59:59.000Z

454

A Smarter Transmission Grid  

Science Conference Proceedings (OSTI)

Our modern transmission grid transports bulk power over long distances and across many provincial boundaries, but ever-increasing energy demands are significantly transforming it. Worldwide, many catalysts are driving this transformation, including emerging supply- and demand-side technologies, cyber security concerns, and aging infrastructures, to name just a few. As the grid transforms and more grid-connected renewable resources complicate reliability, it will be increasingly difficult to meet its futu...

2010-12-31T23:59:59.000Z

455

Transmission Price Risk Management  

Science Conference Proceedings (OSTI)

This report is concerned with the financial risks that arise from the uncertain price of transmission service in restructured or competitive electricity markets. These risks are most severe in markets with locational pricing (LMP), but they also exist in more traditionally organized electricity markets. This report has two main purposes. The first is to review the existing mathematical models of electricity price formation in spot and forward markets that may be helpful as the foundations for developing ...

2006-12-04T23:59:59.000Z

456

Green Transmission Efficiency Initiative  

Science Conference Proceedings (OSTI)

As a consequence of escalating interest in the environment and climate changea national focus on energy efficiency, and growing electricity demandthe time is right to assess energy efficiency from both an end-use perspective as well as across the utility value chain, from generation, to transmission, to distribution. The reduction of our carbon footprint and increasing the role of renewable energy are an important part of the strategy for the greening for electric energy supply. As a result, efficient po...

2009-07-31T23:59:59.000Z

457

The integration of renewable energy sources into electric power transmission systems  

DOE Green Energy (OSTI)

Renewable energy technologies such as photovoltaics, solar thermal power plants, and wind turbines are nonconventional, environmentally attractive sources of energy that can be considered for electric power generation. Many of the areas with abundant renewable energy resources (very sunny or windy areas) are far removed from major load centers. Although electrical power can be transmitted over long distances of many hundreds of miles through high-voltage transmission lines, power transmission systems often operate near their limits with little excess capacity for new generation sources. This study assesses the available capacity of transmission systems in designated abundant renewable energy resource regions and identifies the requirements for high-capacity plant integration in selected cases. In general, about 50 MW of power from renewable sources can be integrated into existing transmission systems to supply local loads without transmission upgrades beyond the construction of a substation to connect to the grid. Except in the Southwest, significant investment to strengthen transmission systems will be required to support the development of high-capacity renewable sources of 1000 MW or greater in areas remote from major load centers. Cost estimates for new transmission facilities to integrate and dispatch some of these high-capacity renewable sources ranged from several million dollars to approximately one billion dollars, with the latter figure an increase in total investment of 35%, assuming that the renewable source is the only user of the transmission facility.

Barnes, P.R.; Dykas, W.P.; Kirby, B.J.; Purucker, S.L. [Oak Ridge National Lab., TN (United States); Lawler, J.S. [Univ. of Tennessee, Knoxville, TN (United States)

1995-07-01T23:59:59.000Z

458

Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.  

SciTech Connect

The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

459

Snowflake divertor configuration studies for NSTX-Upgrade  

SciTech Connect

Snowflake divertor experiments in NSTX provide basis for PMI development toward NSTX-Upgrade. Snowflake configuration formation was followed by radiative detachment. Significant reduction of steady-state divertor heat flux observed in snowflake divertor. Impulsive heat loads due to Type I ELMs are partially mitigated in snowflake divertor. Magnetic control of snowflake divertor configuration is being developed. Plasma material interface development is critical for NSTX-U success. Four divertor coils should enable flexibility in boundary shaping and control in NSTX-U. Snowflake divertor experiments in NSTX provide good basis for PMI development in NSTX-Upgrade. FY 2009-2010 snowflake divertor experiments in NSTX: (1) Helped understand control of magnetic properties; (2) Core H-mode confinement unchanged; (3) Core and edge carbon concentration reduced; and (4) Divertor heat flux significantly reduced - (a) Steady-state reduction due to geometry and radiative detachment, (b) Encouraging results for transient heat flux handling, (c) Combined with impurity-seeded radiative divertor. Outlook for snowflake divertor in NSTX-Upgrade: (1) 2D fluid modeling of snowflake divertor properties scaling - (a) Edge and divertor transport, radiation, detachment threshold, (b) Compatibility with cryo-pump and lithium conditioning; (2) Magnetic control development; and (3) PFC development - PFC alignment and PFC material choice.

Soukhanovskii, V A

2011-11-12T23:59:59.000Z

460

Post Production Heavy Oil Operations: A Case for Partial Upgrading  

E-Print Network (OSTI)

The transportation of heavy oil is a pressing problem. Various methods have been devised to mitigate the reluctance to flow of these highly dense and viscous oils. This study is focused on evaluating a case for post-production partial upgrading of heavy oil. Specifically, we analyze the impact of visbreaking, a mild thermal cracking method, on the economic and energy demands of the post-production process. Using conservative modeling techniques and principles we find significant cost and energy savings can potentially result out of visbreaking. Cost savings result as a consequence of reduced diluent usage. Even the most conservative modeling scenario under consideration exhibits significant cost savings in the form of reduced diluent usage; these savings not only offset operational costs but provide short payback periods on capital expenditures. Additionally, the lower gravity blend resulting from visbreaking can also bring about energy and cost savings in pipeline transportation and positively impact the heavy oil value chain from the producer to a refinery or regional upgrading facility. From this basic analysis of the potential of visbreaking, we can recommend investing resources to study its viability in the field. Using this analysis as a tipping off point and with a detailed look at the chemistry of the oil in question it is possible to make a very viable case for visbreaking. In a similar vein, this analysis can serve as a guide in making a case for other partial upgrading methods as well.

Lokhandwala, Taher

2012-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission upgrades needed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

UPGRADING METHANE USING ULTRA-FAST THERMAL SWING ADSORPTION  

SciTech Connect

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the feasibility of upgrading low-Btu methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys' modular microchannel process technology. The project is on schedule and under budget. For Task 1.1, the open literature, patent information, and vendor contacts were surveyed to identify adsorbent candidates for experimental validation and subsequent demonstration in an MPT-based ultra-fast TSA separation for methane upgrading. The leading candidates for preferential adsorption of methane over nitrogen are highly microporous carbons. A Molecular Gate{trademark} zeolite from Engelhard Corporation has emerged as a candidate. For Task 1.2, experimental evaluation of adsorbents was initiated, and data were collected on carbon (MGN-101) from PICA, Inc. This carbon demonstrated a preferential capacity for methane over nitrogen, as well as a reasonable thermal swing differential capacity for a 90% methane and 10% nitrogen mixture. A similar methane swing capacity at 2 psig was measured. The mixture composition is relevant because gob gas contains nearly 85% methane and must be purified to 97% methane for pipeline quality.

Anna Lee Tonkovich

2004-01-01T23:59:59.000Z

462

A new ATLAS efficiency and intensity upgrade project.  

SciTech Connect

The ATLAS facility provides beams of essentially all stable isotopes at energies above the Coulomb barrier for nuclear physics research. We have developed a two-stage ATLAS upgrade plan which includes the replacement of aging split-ring cavities by high-performance quarter-wave resonators (QWR) capable of accelerating {approx}100 p{mu}A ion beams. The first stage of the upgrade project funded through the American Recovery and Reinvestment Act includes accelerator efficiency increase by adding a new RFQ injector, development and construction of a new cryomodule containing up to 3 SC solenoids and 8 QWRs. A new 72.75 MHz resonator is designed for an optimum ion velocity {beta} = 0.075. To achieve record high accelerating voltage {approx}2.5 MV at this very low velocity range, EM properties of the resonator are highly optimized to reduce peak surface fields. The resonator will be equipped with a piezoelectric fast tuner and capacitive coupler to transmit several kilowatts of RF power. The vast experience gained during the development, commissioning and operation of the ATLAS energy upgrade cryomodule [1] will be applied for the design of the new cryomodule.

Ostroumov, P. N.; Fuerst, J. D.; Kelly, M. P.; Mustapha, B.; Shepard, K. W.; Xu, J.; Physics

2009-01-01T23:59:59.000Z

463

Electricity Transmission and Distribution Technologies ...  

Electricity Transmission and Distribution Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research ...

464

WestConnect Transmission Product  

NLE Websites -- All DOE Office Websites (Extended Search)

WestConnect Transmission Product Federal Register Notices Customer Notifications Customer Comments Approved Rate Order FERC Confirmation...

465

Transmission eigenvalues for elliptic operators  

E-Print Network (OSTI)

A reduction of the transmission eigenvalue problem for multiplicative sign-definite perturbations of elliptic operators with constant coefficients to an eigenvalue problem for a non-selfadjoint compact operator is given. Sufficient conditions for the existence of transmission eigenvalues and completeness of generalized eigenstates for the transmission eigenvalue problem are derived. In the trace class case, the generic existence of transmission eigenvalues is established.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

2010-07-03T23:59:59.000Z

466

Transmission Planning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to...

467

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

B. Kirby. 2001. Transmission Planning for a Restructuringindustry_issues/energy_infrastructure/transmission/transmission_hirst.pdf Joskow, P.L. 2005a. “Transmission

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

468

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network (OSTI)

availability and demand needs are incorporated into models to quantify the benefits of new transmission.Availability and use of a common database (consisting of other expected new generation and transmission

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

469

Western Area Power Administration Transmission Infrastructure...  

NLE Websites -- All DOE Office Websites (Extended Search)

OVERALL ED5-PVH PROJECT BENEFITS April 2011 19 * "Right-sized" to promote renewable energy development in region, especially solar * Stimulate local economy - jobs * Upgrading...

470

Upgrade of the PNNL TEPC and Multisphere Spectrometer  

SciTech Connect

The Pacific Northwest National Laboratory (PNNL) has used two types of instruments, the tissue equivalent proportional counter (TEPC) and the multisphere spectrometer for characterizing neutron radiation fields in support of neutron dosimetry at the Hanford site. The US Department of Energy recently issued new requirements for radiation protection standards in 10 CFR 835 which affect the way that neutron dose equivalent rates are evaluated. In response to the new requirements, PNNL has upgraded the analyses used in conjunction with the TEPC and multisphere. The analysis software for the TEPC was modified for this effort, and a new analysis code was selected for the multisphere. These new analysis techniques were implemented and tested with measurement data that had been collected in previous measurements. In order to test the effectiveness of the changes, measurements were taken in PNNL’s Low Scatter Room using 252Cf sources in both unmoderated and D2O-moderated configurations that generate well-characterized neutron fields. The instruments were also used at Los Alamos National Laboratory (LANL), in their Neutron Free-in-Air calibration room, also using neutron sources that generate well-characterized neutron fields. The results of the software modifications and the measurements are documented in this report. The TEPC measurements performed at PNNL agreed well with accepted dose equivalent rates using the traditional analysis, agreeing with the accepted value to within 13% for both unmoderated and moderated 252Cf sources. When the new analysis was applied to the TEPC measurement data, the results were high compared to the new accepted value. A similar pattern was seen for TEPC measurements at LANL. Using the traditional analysis method, results for all neutron sources showed good agreement with accepted values, nearly always less than 10%. For the new method of analysis, however, the TEPC responded with higher dose equivalent rates than accepted, by as much as 25%. The reason for the overresponse is that there is very little attenuation of the neutrons by tissue, so it cannot match the effect of attenuation by 1 cm of tissue called for in the new standards. This could be corrected with a modified instrument with a thicker wall, or by analytical means that would need to be developed. The multisphere spectrometer performed reasonably well both at PNNL and at LANL. It could produce a neutron spectrum that was similar to the accepted spectrum, and total flux values were usually within 15% of the accepted values. Dose equivalent rates were usually within 18% of the accepted values. The average energies, however, were usually lower than the accepted values. The performance of this instrument could be much better than seen in this study. If PNNL were to add some moderating spheres to its measurement set and calculate a new set of instrument response functions, performance could be improved. The multisphere could then be a more useful instrument for assessing the dose equivalent rate in the workplace.

Scherpelz, Robert I.; Conrady, Matthew M.

2008-09-10T23:59:59.000Z

471

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

472

MICRON SIZE LASER-WIRE SYSTEM AT THE ATF EXTRACTION LINE, RECENT RESULTS AND ATF-II UPGRADE  

E-Print Network (OSTI)

The KEK Accelerator test facility (ATF) extraction line laser-wire system has been upgraded last year allowing the measurement of micron scale transverse size electron beams. The most recent measurements using the upgraded system are presented. The ATF-II extraction line design call for the major upgrade of the existing laser-wire system. We report on the hardware upgrades, including the major hardware upgrades to the laser transport, the laser beam diagnostics line, and the mechanical control systems.

Blair, G A; Boorman, G; Bosco, A; Deacon, L; Karataev, P; Howell, D; Nevay, L J; Corner, L; Delerue, N; Foster, B; Gannaway, F; Newman, M; Senanayake, R; Walczak, R; Hayano, H; Aryshev, A; Terunuma, N; Urakawa, J

2009-01-01T23:59:59.000Z

473

Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Keeler-to-Tillamook Transmission Line Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment October 2013 This page deliberately left blank. Bonneville Power Administration i Contents Chapter 1 Purpose and Need for Action ............................................................................................ 1-1 1.1 Introduction ................................................................................................................................. 1-1 1.2 Need for Action ............................................................................................................................ 1-1 1.3 Purposes of Action ....................................................................................................................... 1-2

474

Microsoft Word - Swan%20Valley%20-%20Palisades%20Communication%20Upgrade%20CX[1].doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dave Tripp - TEP-CSB-1 Dave Tripp - TEP-CSB-1 Proposed Action: Swan Valley - Palisades Communication Upgrade Budget Information: Work Order # 00253530 Task 03 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems, data processing equipment, and similar electronic equipment." B4.6 "Additions or modifications to electric power transmission facilities..." Location: Township 2 North, Range 43 East, Sections 25 and 26 of the Swan Valley Quadrangle Township 1 South, Range 45 East, Section 17 of the Palisades Dam Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install new equipment for microwave

475

NREL: Transmission Grid Integration - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

476

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

477

Design and performance of the collective Thomson scattering receiver at ASDEX Upgrade  

SciTech Connect

Here we present the design of the fast-ion collective Thomson scattering receiver for millimeter wave radiation installed at ASDEX Upgrade, a tokamak for fusion plasma experiments. The receiver can detect spectral power densities of a few eV against the electron cyclotron emission background on the order of 100 eV under presence of gyrotron stray radiation that is several orders of magnitude stronger than the signal to be detected. The receiver down converts the frequencies of scattered radiation (100-110 GHz) to intermediate frequencies (IF) (4.5-14.5 GHz) by heterodyning. The IF signal is divided into 50 IF channels tightly spaced in frequency space. The channels are terminated by square-law detector diodes that convert the signal power into DC voltages. We present measurements of the transmission characteristics and performance of the main receiver components operating at mm-wave frequencies (notch, bandpass, and lowpass filters, a voltage-controlled variable attenuator, and an isolator), the down-converter unit, and the IF components (amplifiers, bandpass filters, and detector diodes). Furthermore, we determine the performance of the receiver as a unit through spectral response measurements and find reasonable agreement with the expectation based on the individual component measurements.

Furtula, V.; Salewski, M.; Leipold, F.; Michelsen, P. K.; Korsholm, S. B.; Meo, F.; Moseev, D.; Nielsen, S. K.; Stejner, M. [Association Euratom - Risoe National Laboratory for Sustainable Energy, Technical University of Denmark, DK-4000 Roskilde (Denmark); Johansen, T. [DTU Elektro, Technical University of Denmark, DK-2800 Lyngby (Denmark)

2012-01-15T23:59:59.000Z

478

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications Proceedings of the March 25-26, 2009 Conference for the...

479

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

stability  analysis of transmission and distribution Voltage Recovery, NERC Transmission Issues  Subcommitte Air Conditioner Response to Transmission Faults. ” ,” IEEE 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

480

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

differences: models for transmission property rights,” IEEEto solve power transmission network design problems,” IEEES. A. "Network topologies and transmission investment under