FEDERAL SMART GRID TASK FORCE - February 26, 2009 Task Force...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL SMART GRID TASK FORCE - February 26, 2009 Task Force Meeting Agenda FEDERAL SMART GRID TASK FORCE - February 26, 2009 Task Force Meeting Agenda February 26, 2009 Task Force...

2

ILC Citizens' Task Force  

NLE Websites -- All DOE Office Websites (Extended Search)

the Fermilab ILC Citizens' Task Force June 2008 Report of the Fermilab ILC Citizens' Task Force 3 Contents 1 Executive Summary 3 Chapter 1 Purpose 7 Chapter 2 Origins and Purpose of the Fermilab Citizens' Task Force 15 Chapter 3 Setting the Stage 19 Chapter 4 Current Status of High Energy Physics Research 25 Chapter 5 Bringing the Next-Generation Accelerator to Fermilab 31 Chapter 6 Learning from Past Projects 37 Chapter 7 Location, Construction and Operation of Facilities Beyond Fermilab's Borders 45 Chapter 8 Health and Safety 49 Chapter 9 Environment 53 Chapter 10 Economics 59 Chapter 11 Political Considerations 65 Chapter 12 Community Engagement 77 Chapter 13 Summary 81 Appendices Appendix A. Task Force Members Appendix B. Task Force Meetings and Topics

3

EPRI Transformer Task Force Proceedings  

Science Conference Proceedings (OSTI)

The EPRI Transformer Task Force held a meeting on December 4, 2007, in San Antonio, Texas. This technical update contains the proceedings of the meeting.

2008-02-12T23:59:59.000Z

4

EPRI Transformer Task Force Proceedings  

Science Conference Proceedings (OSTI)

This report contains the proceedings from the EPRI Transformers Task Force, which was held in Montreal on October 26 and 27, 2006.

2006-12-12T23:59:59.000Z

5

Army Energy Initiatives Task Force  

Energy.gov (U.S. Department of Energy (DOE))

Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—covers the Army Energy Initiatives Task Force.

6

Nuclear Radiological Threat Task Force Established | National...  

National Nuclear Security Administration (NNSA)

Force Established Nuclear Radiological Threat Task Force Established November 03, 2003 Washington, DC Nuclear Radiological Threat Task Force Established NNSA's Administrator...

7

Task Force Approach | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Force Approach Task Force Approach Task Force Approach Task Force Approach Results of the ARI Task Force: The purpose of the ARI Task Force is to 1) identify, prioritize, and resolve issues to enable sites and programs to implement revitalization efforts more effectively and 2) to facilitate programmatic incorporation of revitalization concepts into DOE's programmatic business environments. The Task Force must do this through coordinating and facilitating communication and connections, sharing lessons learned, broadening the general knowledge base, facilitating, analyzing problems, developing implementable solutions, and considering and incorporating broader perspectives and knowledge. The success of the Task Force can be evaluated by impacts to the Department upon its completion. These impacts

8

Alternative Fuels Data Center: Energy Task Force  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Energy Task Force to Energy Task Force to someone by E-mail Share Alternative Fuels Data Center: Energy Task Force on Facebook Tweet about Alternative Fuels Data Center: Energy Task Force on Twitter Bookmark Alternative Fuels Data Center: Energy Task Force on Google Bookmark Alternative Fuels Data Center: Energy Task Force on Delicious Rank Alternative Fuels Data Center: Energy Task Force on Digg Find More places to share Alternative Fuels Data Center: Energy Task Force on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Energy Task Force The Governor's Task Force on Energy Policy is developing a state energy plan to facilitate energy efficiency and the use of alternative and renewable fuels in Tennessee. The energy plan will include a summary of

9

Nuclear Radiological Threat Task Force Established | National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Radiological Threat Task Force Established | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

10

Army Energy Initiatives Task Force  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UNCLASSIFIED UNCLASSIFIED Army Energy Initiatives Task Force Kathy Ahsing Director, Planning and Development UNCLASSIFIED 2 Perfect Storm UNCLASSIFIED 3 U.S. Army Energy Consumption, 2010 23% 77% 42% 58%  Facilities  Vehicles & Equipment (Tactical and Non-tactical) Sources: Energy Information Agency, 2010 Annual Energy Review; Agency Annual Energy Management Data Reports submitted to DOE's Federal Energy Management Program (Preliminary FY 2010) 32% 68% DoD 80% Army 21% Federal Gov 1% Federal Government United States Department of Defense U.S. = 98,079 Trillion Btu DoD = 889 Trillion Btu Fed Gov = 1,108 Trillion Btu U.S. Army = 189 Trillion Btu FY10 Highlights - $2.5+B Operational Energy Costs - $1.2 B Facility Energy Costs

11

Smart Grid Task Force Presentations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services Technology Development Smart Grid Federal Smart Grid Task Force Smart Grid Task Force Presentations Smart Grid Task Force Presentations Presentations about the...

12

Smart Grid Task Force Presentations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Grid Federal Smart Grid Task Force Smart Grid Task Force Presentations Smart Grid Task Force Presentations Electricity Advisory Committee Technology Development...

13

Internet Engineering Task Force KK Ramakrishnan ...  

Science Conference Proceedings (OSTI)

... Engineering Task Force KK Ramakrishnan INTERNET DRAFT AT&T Labs Research draft-kksjf-ecn-00.txt Sally Floyd LBNL November 1997 ...

2009-08-19T23:59:59.000Z

14

Weardale Task Force | Open Energy Information  

Open Energy Info (EERE)

search Name Weardale Task Force Place England, United Kingdom Sector Biomass, Geothermal energy, Hydro, Solar, Wind energy Product Durham based project consortium that is...

15

FEDERAL SMART GRID TASK FORCE - February 26, 2009 Task Force Meeting Agenda  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL SMART GRID TASK FORCE - February 26, 2009 Task Force FEDERAL SMART GRID TASK FORCE - February 26, 2009 Task Force Meeting Agenda FEDERAL SMART GRID TASK FORCE - February 26, 2009 Task Force Meeting Agenda February 26, 2009 Task Force Meeting Agenda - CONFERENCE CALL Agenda FEDERAL SMART GRID TASK FORCE CONFERENCE CALL February 26, 2009 10:00-11:00 AM 10:00 Opening and Introduction - Eric Lightner, DOE * Call the meeting to order, around-the-table introductions, review of the agenda, additions to agenda 10:05 Update from DOE - Eric Lightner * Stimulus update * E-Forum * Fact sheet - discussion 10:30 Update from FERC - Ray Palmer, David Andrejcak * NARUC-FERC Smart Grid Collaborative meeting update 10:40 Update from NIST - William Anderson, Jerry FitzPatrick * Interoperability Standards Framework report to Congress

16

Task force report on computerized tomographic scanners  

SciTech Connect

Computerized axial tomography (CAT) scanning was the focus of a task force established by the Bergen-Passaic Health Systems Agency in New Jersey. The task force reviewed the literature on CAT technology and its applications, surveyed four northeastern hospitals with operating CAT scanning installations, and created three working subcommittees which produced written reports. It was agreed by task force members that certain criteria should be used when evaluating applications for CAT scanners, e.g., service area, staff resources, emergency room activity, radiotherapy, 24-hour scanner coverage, the medically indigent, and cost. Overall, it was determined that CAT is a proven diagnostic tool of significant value and that it should be available to residents of the Bergen-Passaic health service area. Since the CAT field is rapidly evolving and changing, however, it was not possible to define quantitatively the long-term need for and supply of CAT scanners in the region. Appendixes present supporting data on the task force findings.

1978-10-01T23:59:59.000Z

17

Collaborative Utility Task Force Partners with DOE to Develop...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Collaborative Utility Task Force Partners with DOE to Develop Cyber Security Requirements for Advanced Metering Infrastructure Collaborative Utility Task Force Partners with DOE to...

18

Federal Task Force Sends Recommendations to President on Fostering...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Force Sends Recommendations to President on Fostering Clean Coal Technology Federal Task Force Sends Recommendations to President on Fostering Clean Coal Technology August 12,...

19

Clean Air Task Force CATF | Open Energy Information  

Open Energy Info (EERE)

Task Force CATF Jump to: navigation, search Name Clean Air Task Force (CATF) Place Boston, Massachusetts Zip 2108 Product Massachusetts-based scientific research and legal advocacy...

20

U.S. Transport Task Force 2010  

Science Conference Proceedings (OSTI)

The Transport Task Force (TTF) Meeting is a venue for vigorous scientific discourse and discussion on topics in transport and turbulence in fusion plasmas. Its participation is international. The 2010 meeting was highly effective, with 139 registered participants and 131 presentations. This is remarkable for an even year (IAEA year) meeting. The meeting clearly fostered progress in understanding and control of turbulent transport.

Diamond, P.H.

2011-09-21T23:59:59.000Z

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

REPORT OF THE DARK ENERGY TASK FORCE  

E-Print Network (OSTI)

REPORT OF THE DARK ENERGY TASK FORCE Andreas Albrecht, University of California, Davis Gary. Suntzeff, Texas A&M University Dark energy appears to be the dominant component of the physical Universe a full understanding of the cosmic acceleration. For these reasons, the nature of dark energy ranks among

Hu, Wayne

22

Federal Smart Grid Task Force | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Smart Federal Smart Grid Task Force Federal Smart Grid Task Force Task Force Background The Federal Smart Grid Task Force was established under Title XIII of the Energy Independence and Security Act of 2007 (EISA) and includes experts from eleven Federal agencies. The Department of Energy is represented by the Office of Electricity Delivery and Energy Reliability which is the Task Force lead, as well as the Office of Energy Efficiency and Renewable Energy and the National Energy Technology Laboratory. Task Force Mission The mission of the Task Force is to ensure awareness, coordination and integration of the diverse activities of the Federal Government related to smart grid technologies, practices, and services. The Task Force will collaborate with DOE's Electricity Advisory Committee and other relevant

23

Transport Task Force (TTF) 2011 | Princeton Plasma Physics Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

2011, 9:00am to April 9, 2011, 5:00pm Conference Bahia Resort Hotel San Diego, CA USA Transport Task Force (TTF) 2011 The ultimate goal of the work of the Transport Task Force is a...

24

USLCSG Task Force Meeting June 2003  

NLE Websites -- All DOE Office Websites (Extended Search)

All Task Force Meeting at SLAC All Task Force Meeting at SLAC June 15, 16, 2003 Meeting Agenda What's New! June 2003 Meeting Accommodations: The new SLAC Guest House is now available, but the block of rooms for the meeting has now been released, and space is first-come first-serve. If you want to use it, please book directly at SLAC Guest House. or let Naomi know ASAP. You need to mention Dave or Naomi's name as a host name. Daily rate is $50 + tax for the one full sized bed room (Standard room). Lunch on Sunday and Coffee services: The cafeteria is closed on Sunday, so we will order box lunches for meeting delegates. We will collect $10 per person to cover the cost of lunch on Sunday. Please pay $10 in cash to Naomi Nagahashi on Monday, June 16. If you need a receipt, she will provide one. We need a count of the lunches to provide, so please let Naomi know, if you need a box lunch, by Friday, June 6. On Monday, the cafeteria will be open for breakfast and lunch.

25

Federal Energy Management Program: Interagency Energy Management Task Force  

NLE Websites -- All DOE Office Websites (Extended Search)

About the Program About the Program Site Map Printable Version Share this resource Send a link to Federal Energy Management Program: Interagency Energy Management Task Force Members to someone by E-mail Share Federal Energy Management Program: Interagency Energy Management Task Force Members on Facebook Tweet about Federal Energy Management Program: Interagency Energy Management Task Force Members on Twitter Bookmark Federal Energy Management Program: Interagency Energy Management Task Force Members on Google Bookmark Federal Energy Management Program: Interagency Energy Management Task Force Members on Delicious Rank Federal Energy Management Program: Interagency Energy Management Task Force Members on Digg Find More places to share Federal Energy Management Program: Interagency Energy Management Task Force Members on AddThis.com...

26

CHARTER, Price-Anderson Act Task Force | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CHARTER, Price-Anderson Act Task Force CHARTER, Price-Anderson Act Task Force CHARTER, Price-Anderson Act Task Force This charter establishes the responsibilities of the Price-Anderson Act Task Force (Task Force). The Secretary of Energy has approved formation of this Task Force to review the need for the continuation or modification of the Price-Anderson Act, section 170 of the Atomic Energy Act of 1954, as amended (AEA), and to prepare a detailed report for submission to Congress as required by section 170p. of the AEA by August 1, 1998. CHARTER, Price-Anderson Act Task Force More Documents & Publications MEMORANDUM FOR THE SECRETARY Report to Congress on the Price-Anderson Act Appendix A. Notice of Inquiry: Preparation of Report to Congress on Price-Anderson Act. 62 Federal Register 68,272 (December 31, 1997)

27

U.S. - Canada Power System Outage Task Force: Final Report on...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations U.S. - Canada Power System Outage Task Force: Final Report on the...

28

Interagency Energy Management Task Force Members | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Force Members Force Members Interagency Energy Management Task Force Members October 8, 2013 - 1:31pm Addthis The Interagency Energy Management Task Force is composed of Federal energy managers, members of Federal Energy Management Program (FEMP), and industry participants. The FEMP director serves as the executive director of the task force. Task Force Executive Director Dr. Timothy Unruh U.S. Department of Energy 202-586-5772 Task Force Members Mark Ewing General Services Administration 202-708-9296 Holger Fischer National Aeronautics and Space Administration 202-358-0416 Wayne Thalasinos National Aeronautics and Space Administration 202-358-3811 Mark Sprouse National Archives and Records Administration 301-837-3019 Leslie Ford Social Security Administration 410-594-0111 David Zimmerman

29

Microsoft Word - Energy Code Enforcement Funding Task Force ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of EIA's Annual Energy Outlook 2010, including projected construction levels, energy consumption, and fuel prices. The task force conservatively assumed a 4-year payback period...

30

NETL: News Release - Federal Task Force Sends Recommendations...  

NLE Websites -- All DOE Office Websites (Extended Search)

Obama told the nation's governors when establishing the task force, co-chaired by Energy Secretary Steven Chu and EPA Administrator Lisa Jackson. "These recommendations mark...

31

Geothermal: Sponsored by OSTI -- Solar energy task force report...  

Office of Scientific and Technical Information (OSTI)

task force report technical training guidelines Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us | Admin Log On HomeBasic Search About Publications...

32

Forced cooling of underground electric power transmission lines : design manual  

E-Print Network (OSTI)

The methodology utilized for the design of a forced-cooled pipe-type underground transmission system is presented. The material is divided into three major parts: (1) The Forced-cooled Pipe-Type Underground Transmission ...

Brown, Jay A.

1978-01-01T23:59:59.000Z

33

Clinch River MRS Task Force Recommendations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clinch River MRS Task Force Recommendations Clinch River MRS Task Force Recommendations Clinch River MRS Task Force Recommendations The Clinch River HRS Task Force was appointed in July 1985 by the Roane County Executive and the Oak Ridge City Council to evaluate the Monitored Retrievable Storage (MRS) facility proposed by the Department of Energy to be constructed in the Roane County portion of Oak Ridge. After several months of study, numerous public meetings, site visits to relevant facilities, and careful evaluation of the integrated MRS concept, it is the considered opinion of the Task Force that the facility could be safely built and operated in Roane County/Oak Ridge. However, a MRS facility constructed in the Roane County portion of Oak Ridge would not be generally perceived as being safe by the citizens of Roane County and Oak Ridge

34

Department of Energy Establishes Asset Revitalization Task Force |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Establishes Asset Revitalization Task Force Establishes Asset Revitalization Task Force Department of Energy Establishes Asset Revitalization Task Force February 17, 2011 - 12:00pm Addthis Media Contact (202) 586-4940 Washington, D.C. - Secretary of Energy Steven Chu today announced the establishment of a Task Force on Asset Revitalization to facilitate a discussion among the Department of Energy, communities around DOE sites, nonprofits, tribal governments, the private sector and other stakeholders to identify reuse approaches as environmental cleanup efforts reach completion. The task force will explore opportunities to reutilize DOE site assets for beneficial purposes, which may include clean energy development, environmental sustainability projects, open space or other uses. "For decades, Department of Energy sites and their surrounding

35

Nuclear Radiological Threat Task Force Established | National Nuclear  

NLE Websites -- All DOE Office Websites (Extended Search)

Radiological Threat Task Force Established | National Nuclear Radiological Threat Task Force Established | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > Nuclear Radiological Threat Task Force Established Nuclear Radiological Threat Task Force Established November 03, 2003 Washington, DC Nuclear Radiological Threat Task Force Established

36

Clinch River MRS Task Force Recommendations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clinch River MRS Task Force Recommendations Clinch River MRS Task Force Recommendations Clinch River MRS Task Force Recommendations The Clinch River HRS Task Force was appointed in July 1985 by the Roane County Executive and the Oak Ridge City Council to evaluate the Monitored Retrievable Storage (MRS) facility proposed by the Department of Energy to be constructed in the Roane County portion of Oak Ridge. After several months of study, numerous public meetings, site visits to relevant facilities, and careful evaluation of the integrated MRS concept, it is the considered opinion of the Task Force that the facility could be safely built and operated in Roane County/Oak Ridge. However, a MRS facility constructed in the Roane County portion of Oak Ridge would not be generally perceived as being safe by the citizens of Roane County and Oak Ridge

37

Collaborative Utility Task Force Partners with DOE to Develop Cyber  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Collaborative Utility Task Force Partners with DOE to Develop Cyber Collaborative Utility Task Force Partners with DOE to Develop Cyber Security Requirements for Advanced Metering Infrastructure Collaborative Utility Task Force Partners with DOE to Develop Cyber Security Requirements for Advanced Metering Infrastructure The Advanced Metering Infrastructure Security (AMI-SEC) Task Force announces the release of the AMI System Security Requirements, a first-of-its-kind for the utility industry that will help utilities procure and implement secure components and systems using a common set of security requirements. Collaborative Utility Task Force Partners with DOE to Develop Cyber Security Requirements for Advanced Metering Infrastructure More Documents & Publications AMI System Security Requirements - v1_01-1 Before the Senate Energy and Natural Resources Committee

38

Smart Grid Task Force Presentations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Smart Federal Smart Grid Task Force » Smart Grid Task Force Presentations Smart Grid Task Force Presentations Presentations about the Federal Smart Grid Task Force and it's activities will be posted as soon as they become available. May 7, 2008 - Smart Grid Activities at the Department of Energy (PDF 349 KB) May 19, 2008 - What is a Smart Grid? Edison Electric Institute E-Forum, Joe Miller, Horizon Energy Group (PDF 530 KB) June 16, 2008 - The Smart Grid: Benefits and Challenges, Edison Electric Institute E-Forum, Joe Miller, Horizon Energy Group (PDF 1.44 MB) June 20, 2008 - Smart Grid Implementation Workshop Opening Plenary Presentations Visions of the Smart Grid: Deconstructing the traditional utility to build the virtual utility, by Tom Standish, CenterPoint Energy (PDF 2.66

39

Task Force for Strategic Developments to Blue Ribbon Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Force for Strategic Developments to Blue Ribbon Commission Task Force for Strategic Developments to Blue Ribbon Commission Recommendations Task Force for Strategic Developments to Blue Ribbon Commission Recommendations Formed at the direction of the President to Secretary Chu and included leading experts. Purpose to conduct a comprehensive review of polices for managing the back end of the nuclear fuel cycle; i.e., recycle before storage and permanent disposal. Detailed analysis, with eight major recommendations; also recommended near-term actions. Task Force for Strategic Developments to Blue Ribbon Commission Recommendations More Documents & Publications Categorization of Used Nuclear Fuel Inventory in Support of a Comprehensive National Nuclear Fuel Cycle Strategy DOE Office of Nuclear Energy Transportation Planning, Route Selection, and

40

University Research Reactor Task Force to the Nuclear Energy Research  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

University Research Reactor Task Force to the Nuclear Energy University Research Reactor Task Force to the Nuclear Energy Research Advisory Committee University Research Reactor Task Force to the Nuclear Energy Research Advisory Committee In mid-February, 2001 The University Research Reactor (URR) Task Force (TF), a sub-group of the Department of Energy (DOE) Nuclear Energy Research Advisory Committee (NERAC), was asked to: * Analyze information collected by DOE, the NERAC "Blue Ribbon Panel," universities, and other sources pertaining to university reactors including their research and training capabilities, costs to operate, and operating data, and * Provide DOE with clear, near-term recommendations as to actions that should be taken by the Federal Government and a long-term strategy to assure the continued operation of vital university reactor facilities in

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Federal Task Force Sends Recommendations to President on Fostering Clean  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Task Force Sends Recommendations to President on Fostering Federal Task Force Sends Recommendations to President on Fostering Clean Coal Technology Federal Task Force Sends Recommendations to President on Fostering Clean Coal Technology August 12, 2010 - 1:00pm Addthis Washington, DC - President Obama's Interagency Task Force on Carbon Capture and Storage (CCS), co-chaired by the U.S. Environmental Protection Agency (EPA) and the Department of Energy (DOE), delivered a series of recommendations to the president today on overcoming the barriers to the widespread, cost-effective deployment of CCS within 10 years. CCS is a group of technologies for capturing, compressing, transporting and permanently storing power plant and industrial source emissions of carbon dioxide. Rapid development and deployment of clean coal technologies,

42

Federal Task Force Sends Recommendations to President on Fostering Clean  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Force Sends Recommendations to President on Fostering Task Force Sends Recommendations to President on Fostering Clean Coal Technology Federal Task Force Sends Recommendations to President on Fostering Clean Coal Technology August 12, 2010 - 12:00am Addthis WASHINGTON - President Obama's Interagency Task Force on Carbon Capture and Storage (CCS), co-chaired by the U.S. Environmental Protection Agency (EPA) and the Department of Energy (DOE), delivered a series of recommendations to the president today on overcoming the barriers to the widespread, cost-effective deployment of CCS within 10 years. CCS is a group of technologies for capturing, compressing, transporting and permanently storing power plant and industrial source emissions of carbon dioxide. Rapid development and deployment of clean coal technologies, particularly

43

Task Force for Strategic Developments to Blue Ribbon Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Force for Strategic Developments to Blue Ribbon Commission Task Force for Strategic Developments to Blue Ribbon Commission Recommendations Task Force for Strategic Developments to Blue Ribbon Commission Recommendations Formed at the direction of the President to Secretary Chu and included leading experts. Purpose to conduct a comprehensive review of polices for managing the back end of the nuclear fuel cycle; i.e., recycle before storage and permanent disposal. Detailed analysis, with eight major recommendations; also recommended near-term actions. Task Force for Strategic Developments to Blue Ribbon Commission Recommendations More Documents & Publications DOE Office of Nuclear Energy Transportation Planning, Route Selection, and Rail Issues Categorization of Used Nuclear Fuel Inventory in Support of a Comprehensive

44

First interim report of the Federal Fleet Conversion Task Force  

DOE Green Energy (OSTI)

The Federal Fleet Conversion Task Force was created by Executive Order 12844, signed by President Clinton on April 21, 1993. In the Order, the President directed that purchases of alternative fueled vehicles by the Federal Government be substantially increased beyond the levels required by current law. The President charged the Task Force with developing recommendations for carrying out the Executive Order, with special emphasis on setting a course that will lead to the widespread use of alternative fueled vehicles by Federal, State, and local government fleets, by private fleets and, ultimately, by individuals. The chief recommendation of the Task Force is the establishment of a Presidential Clean Cities Initiative. To support creation of the Presidential Initiative, the Task Force identified 38 cities and regions, prioritized into three tiers, for concentrating the Initiative`s efforts in Fiscal Years 1994 through 1996. This concentration of effort is key to the effectiveness of the Initiative. The 38 cities and regions would receive priority funding for Federal vehicle purchases and for infrastructure development. In addition, the Task Force has made specific recommendations for overcoming numerous regulatory, economic, and technical barriers that have slowed the introduction of alternative fueled vehicles into general use.

Not Available

1993-08-01T23:59:59.000Z

45

Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan The natural resources of the Gulf's ecosystem are vital to many of the region's industries that directly support economic progress and job creation, including tourism and recreation, seafood production and sales, energy production and navigation and commerce. Among the key priorities of the strategy are: 1) Stopping the Loss of Critical Wetlands, Sand Barriers and Beaches The strategy recommends placing ecosystem restoration on an equal footing with historic uses such as navigation and flood damage reduction by approaching water resource management decisions in a far more comprehensive manner that will bypass harm to wetlands, barrier islands and beaches. The

46

Northeast High-Level Radioactive Waste Transportation Task Force Agenda  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northeast High-Level Radioactive Waste Transportation Task Force Northeast High-Level Radioactive Waste Transportation Task Force Spring Meeting - May 15, 2012 Hilton Knoxville 501 West Church Avenue, Knoxville, TN 37902-2591 Agenda (Draft #1 - 4/18/12) ______________________________________________________________________________ Tuesday, May 15 - 9:00 AM - 3:30 PM / (need meeting room name) 8:00 a.m. Continental Breakfast - served in meeting room 9:00 a.m. Task Force Business Meeting - John Giarrusso, MEMA and Rich Pinney, NJDEP Co-chairs presiding  Welcome: Introductions; Agenda Review; Announcements  2012 funding  Co-Chair Election  Rules of Procedure  Membership: members & alternates appointment status  Legislative Liaisons  Staff Regional Meeting Attendance

47

Department of Energy Establishes Asset Revitalization Task Force  

NLE Websites -- All DOE Office Websites (Extended Search)

Thursday, February 17, 2011 Thursday, February 17, 2011 Department of Energy Establishes Asset Revitalization Task Force Washington, D.C. � Secretary of Energy Steven Chu today announced the establishment of a Task Force on Asset Revitalization to facilitate a discussion among the Department of Energy, communities around DOE sites, nonprofits, tribal governments, the private sector and other stakeholders to identify reuse approaches as environmental cleanup efforts reach completion. The task force will explore opportunities to reutilize DOE site assets for beneficial purposes, which may include clean energy development, environmental sustainability projects, open space or other uses. �For decades, Department of Energy sites and their surrounding communities have played a vital role in supporting the nation�s nuclear

48

Project Independence. Final task force report: geothermal energy  

SciTech Connect

This report contains the final technical analysis of the Project Independence Interagency Geothermal Task Force chaired by the National Science Foundation. The potential of geothermal energy, resources, fuel cycles, and the status of geothermal technology are outlined. Some constraints inhibiting rapid and widespread utilization and some Federal actions to remove utilization barriers are described. (MOW)

1974-11-01T23:59:59.000Z

49

Urban Consortium Energy Task Force - Year 21 Final Report  

Science Conference Proceedings (OSTI)

The Urban Consortium Energy Task Force (UCETF), comprised of representatives of large cities and counties in the United States, is a subgroup of the Urban Consortium, an organization of the nation's largest cities and counties joined together to identify, develop and deploy innovative approaches and technological solutions to pressing urban issues.

NONE

2003-04-01T23:59:59.000Z

50

Fort Union Regional Task Forces, proceedings. Volume II  

SciTech Connect

North Dakota, South Dakota, Montana, and Wyoming created seven task forces to study the interstate effects of the Fort Union Coal Formation which underlies parts of each of these states. Volume 2 discusses the following: (1) social and economic impact; (2) taxation of energy resources; and (3) water quality and quality problems. (Portions of this document are not fully legible)

1977-01-01T23:59:59.000Z

51

Fort Union Regional Task Forces, proceedings. Volume I  

SciTech Connect

North Dakota, South Dakota, Montana, and Wyoming created seven task forces to study the interstate effects of the Fort Union Coal Formation which underlies parts of each of these states. Volume 1 covers: (1) air quality; (2) common data element and information exchange; (3) energy development, regulation, and plant siting; and (4) reclamation and land use. (Portions of this document are not fully legible)

1977-01-01T23:59:59.000Z

52

Final Report of the Simulation Optimization Task Force  

Science Conference Proceedings (OSTI)

This is the final report of the ATLAS Simulation Optimization Task Force, establishedin June of 2007. This note justifies the selected Geant4 version, physics list, and range cuts to be used by the default ATLAS simulation for initial data taking and beyond. The current status of several projects, including detector description, simulation validation, studies of additional Geant4 parameters, and cavern background, are reported.

ATLAS Collaboration; Rimoldi, A.; Carli, T.; Dell'Acqua, A.; Froidevaux, D.; Gianotti, F.; Guyot, C.; Hinchliffe, I.; Jakobs, K.; Marshall, Z.; Nisati, A.; Quarrie, D.; Unal, G.; Young, C.

2008-12-15T23:59:59.000Z

53

Report of the Dutchess County Resource Recovery Task Force  

SciTech Connect

In 1978, Dutchess County received a grant from DOE relating to the development of a resource-recovery system for the county. The program objectives were: (1) to recover energy-intensive materials; (2) to recover energy from the waste in the form of a medium-Btu fuel gas or other useful energy form; and (3) to effect a dramatic reduction in the quantity of solids to be disposed of in a landfill. Task I involved project management planning, including the assembling of a team and the development of a decision/milestone plan for implementation. Task II involved the confirmation of the conceptual design of a Union Carbide Purox pyrolysis facility. The study was to concentrate on siting of the facility, verification of waste quantities available for processing, and net processing costs based on current projected revenues versus facility construction and operating costs. A review of the work to the completion of the Task Force evaluation and recommendations made by the Dutchess County Resource Task Force are given. General recommendations for the proposed resource-recovery facility are to have: a sufficient and controlled waste stream, a recovered-energy customer, and a facility that is strategically located, reliable, and efficient. (MCW)

Not Available

1980-01-01T23:59:59.000Z

54

N Reactor Seismic Task Force analysis and fix summary  

Science Conference Proceedings (OSTI)

The N Reactor Safety Enhancement Program (SEP) and the Accelerated Safety Enhancement Program (ASEP) were established to implement recommendations made earlier by study groups assessing the safety of N Reactor. The recommendations which dealt with seismic issues were assigned to Safety Enhancement Programs, Defense Reactor Programs for implementation. A Seismic Task Force was assembled to perform the analyses, design the modifications, direct the performance of the work and provide program management of the effort to seismically qualify the facility. This document identifies the reports published by the task force to resolve each of the seismic issues raised by safety assessments. The reports, in turn, provide a list of recommended fixes (Fixes are potential problems, not resolved in the engineering analyses, which require repair, cleanup or modifications to hardware to establish seismic qualification). The purpose of this report is to provide a guide to seismic fixes implemented by the Seismic Task Force. This information is provided in the form of a ``fix log`` which lists fixes according to the report which recommended them and identifies the work authorization (WA), engineering documentation (Design Change, Field Change Notice or Engineering Change Notice) and acceptance dates for each fix. 5 refs., 6 tabs.

Rainey, T.E.

1989-05-01T23:59:59.000Z

55

Sandia-Power Surety Task Force Hawaii foam analysis.  

SciTech Connect

The Office of Secretary of Defense (OSD) Power Surety Task Force was officially created in early 2008, after nearly two years of work in demand reduction and renewable energy technologies to support the Warfighter in Theater. The OSD Power Surety Task Force is tasked with identifying efficient energy solutions that support mission requirements. Spray foam insulation demonstrations were recently expanded beyond field structures to include military housing at Ft. Belvoir. Initial results to using the foam in both applications are favorable. This project will address the remaining key questions: (1) Can this technology help to reduce utility costs for the Installation Commander? (2) Is the foam cost effective? (3) What application differences in housing affect those key metrics? The critical need for energy solutions in Hawaii and the existing relationships among Sandia, the Department of Defense (DOD), the Department of Energy (DOE), and Forest City, make this location a logical choice for a foam demonstration. This project includes application and analysis of foam to a residential duplex at the Waikulu military community on Oahu, Hawaii, as well as reference to spray foam applied to a PACOM facility and additional foamed units on Maui, conducted during this project phase. This report concludes the analysis and describes the utilization of foam insulation at military housing in Hawaii and the subsequent data gathering and analysis.

McIntyre, Annie

2010-11-01T23:59:59.000Z

56

Blackout 2003: U.S. - Canada Task Force Presents Final Report...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. - Canada Task Force Presents Final Report onBlackout of August 2003 Blackout 2003: U.S. - Canada Task Force Presents Final Report onBlackout of August 2003 August 14, 2003,...

57

About Fermilab | Fermilab and the Community | ILC Citizens' Task Force |  

NLE Websites -- All DOE Office Websites (Extended Search)

Expected Topics of the ILC Citizens' Task Force Topic Informal Input Community Concerns Formal Recomm. Orientation of the ILC Location of the underground tunnel X Community issues related to locating an underground tunnel X Potential impacts on groundwater and the environment X X Issues relating to property rights X X X Surface Structures off Fermilab property Locations X X Aesthetic issues X X Environmental impacts X X Features that could be included to benefit communities X X Construction of the ILC Timing of activities X X Safety X X Mitigating noise, traffic, environmental, and other impacts X X Fermilab-Community Relationships Maximizing economic benefits to the region X X

58

Minutes of the Meeting of Task Force on Review of Academic Programs  

E-Print Network (OSTI)

of the Task Force on Review of Academic Programs were approved and are posted on-line. Demo/Review of Task Force Website Duane reported that the Task Force's website is live. In addition to the public to base its work on the strategic plan and that the categories in the original set of values should

59

U.S. - Canada Power System Outage Task Force: Final Report on the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Canada Power System Outage Task Force: Final Report on the - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations On August 14, 2003, the largest power blackout in North American history affected an area with an estimated 50 million people and 61,800 megawatts (MW) of electric load in the states of Ohio, Michigan, Pennsylvania, New York, Vermont, Massachusetts, Connecticut and New Jersey, and the Canadian province of Ontario. U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations More Documents & Publications Blackout 2003: Blackout Final Implementation Report Blackout 2003: The August 14, 2003 Blackout One Year Later: Actions Taken

60

Accelerator R and D task force presentation - m white  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE DOE Accelerator R&D Task Force Charge Presented at the AAI Meeting, 11/29/11 Marion White mwhite@aps.anl.gov Rod Gerig - Context (1)  "The Committee understands that powerful new accelerator technologies created for basic science and developed by industry will produce particle accelerators with the potential to address key economic and societal issues confronting our Nation. However, the Committee is concerned with the divide that exists in translating breakthroughs in accelerator science and technology into applications that benefit the marketplace and American competitiveness. The Committee directs the Department to submit a 10-year strategic plan by June 1, 2012 for accelerator technology research and development to advance accelerator applications in energy and the

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

About Fermilab | Fermilab and the Community | ILC Citizens' Task Force |  

NLE Websites -- All DOE Office Websites (Extended Search)

Meeting Materials Meeting Materials January 27, 2007 Retreat and Tour Agenda (pdf) Presentation by Judy Jackson, Fermilab Director of Communication (pdf) Photos Video March 1, 2007 Introduction to Particle Physics Agenda (pdf) Presentation by Pier Oddone, Fermilab Director (ppt - 13.5M) Presentation by Fermilab Physicist Chris Quigg (pdf - 12M) Photos March 27, 2007 Introduction to the ILC Agenda (pdf) Fermilab Area map with outlines (jpg) ILC by the Numbers (pdf) How does the ILC work? (pdf) ILC Reference Design Companion Document (pdf) Results of Task Force Dialogue on Community Values(pdf) May 1, 2007 The ILC Global Design Effort Agenda (pdf) Presentation by GDE Director Barry Barish (pdf) Photos Video: Part 1 | Part 2 May 22, 2007 Locating the ILC at Fermilab Agenda (pdf) Maps of potential locations for the ILC:

62

Participants: William Naughton, COHMED Bill Sherman, NE HLRW Task Force  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

conference call May 27, 1998 conference call May 27, 1998 Participants: William Naughton, COHMED Bill Sherman, NE HLRW Task Force Bob Fronczak, AAR Mike Butler, UETC Ray English, DOE-NR George Ruberg, UETC Kevin Blackwell, FRA Markus Popa, DOE-RW Sandy Covi, UP The Rail Topic Group is currently in a transitional mode, moving simultaneously toward closure of the two rail information matrices, Comparison of CVSA Recommended National Procedures and Out-Of-Service Criteria for the Enhanced Safety Inspection of Commercial Highway Vehicles Transporting Transuranics, Spent Nuclear Fuel, and High Level Waste to Rail Inspection Standards, and Rail and Highway Regulations Relative to the Transportation of Radioactive Materials and their Applicability to States, Tribes, Shippers, and Carriers, (both

63

About Fermilab | Fermilab and the Community | ILC Citizens' Task Force |  

NLE Websites -- All DOE Office Websites (Extended Search)

Member Commitments Member Commitments It is anticipated that serving on the Task Force will require a commitment of 8-10 hours per month throughout 2007. Activities will include: Attend monthly meetings with a maximum of two excused absences Participate fully in meetings and work with all members to identify shared values and interests and strive for consensus on important issues Read all provided materials in preparation for meetings Read all materials and summaries for any meetings missed Stay in contact with neighbors and associates to bring broader community perspectives to the discussion and inform the community about the ILC Ground Rules This is a safe place to share ideas We will attack issues, never individuals Openness is the rule, not the exception Everyone participates

64

Linkage to Previous International PV Module QA Task Force Workshops; Proposal for Rating System (Presentation)  

DOE Green Energy (OSTI)

This presentation gives the historical background of the creation of the International PV QA Task Force as an introduction to the PV Module Reliability Workshop.

Kurtz, S.; Wohlgemuth, J.; Sample, T.; Yamamichi, M.; Kondo, M.

2013-05-01T23:59:59.000Z

65

Internet Engineering Task Force (IETF) Request for Comments: 5879  

E-Print Network (OSTI)

Heuristics for Detecting ESP-NULL Packets This document describes a set of heuristics for distinguishing IPsec ESP-NULL (Encapsulating Security Payload without encryption) packets from encrypted ESP packets. These heuristics can be used on intermediate devices, like traffic analyzers, and deep-inspection engines, to quickly decide whether or not a given packet flow is encrypted, i.e., whether or not it can be inspected. Use of these heuristics does not require any changes made on existing IPsec hosts that are compliant with RFC 4303. Status of This Memo This document is not an Internet Standards Track specification; it is published for informational purposes. This document is a product of the Internet Engineering Task Force (IETF). It represents the consensus of the IETF community. It has received public review and has been approved for publication by the Internet Engineering Steering Group (IESG). Not all documents approved by the IESG are a candidate for any level of Internet Standard; see Section 2 of RFC 5741. Information about the current status of this document, any errata, and how to provide feedback on it may be obtained at

T. Kivinen; Authentec Inc; D. Mcdonald

2010-01-01T23:59:59.000Z

66

Government Applications Task Force ground truth study of WAG 4  

Science Conference Proceedings (OSTI)

This report documents the Government Applications Task Force (GATF) Buried Waste Project. The project was initiated as a field investigation and verification of the 1994 Strategic Environmental Research and Development Program`s (SERDP) Buried Waste Identification Project results. The GATF project team included staff from three US Department of Energy (DOE) Laboratories [Oak Ridge National Laboratory (ORNL), Los Alamos National Laboratory (LANL), and the Savannah River Technology Center (SRTC)] and from the National Exploitation Laboratory. Similar studies were conducted at each of the three DOE laboratories to demonstrate the effective use of remote sensing technologies. The three locations were selected to assess differences in buried waste signatures under various environmental conditions (i.e., climate, terrain, precipitation, geology, etc.). After a brief background discussion of the SERDP Project, this report documents the field investigation (ground truth) results from the 1994--1995 GATF Buried Waste Study at ORNL`s Waste Area Grouping (WAG) 4. Figures for this report are located in Appendix A.

Evers, T.K.; Smyre, J.L.; King, A.L.

1997-06-01T23:59:59.000Z

67

Internet Engineering Task Force (IETF) Request for Comments: 6521  

E-Print Network (OSTI)

This document describes a home agent-assisted route optimization functionality for the IPv4 Network Mobility Protocol. The function is designed to facilitate optimal routing in cases where all nodes are connected to a single home agent; thus, the use case is route optimization within a single organization or similar entity. The functionality enables the discovery of eligible peer nodes (based on information received from the home agent) and their network prefixes, and the establishment of a direct tunnel between such nodes. Status of This Memo This document is not an Internet Standards Track specification; it is published for examination, experimental implementation, and evaluation. This document defines an Experimental Protocol for the Internet community. This document is a product of the Internet Engineering Task Force (IETF). It represents the consensus of the IETF community. It has received public review and has been approved for publication by the Internet Engineering Steering Group (IESG). Not all documents approved by the IESG are a candidate for any level of Internet Standard; see Section 2 of RFC 5741. Information about the current status of this document, any errata, and how to provide feedback on it may be obtained at

A. Makela; J. Korhonen

2012-01-01T23:59:59.000Z

68

Feasibility of dc transmission with forced commutation to remote loads  

SciTech Connect

Previous researchers have analysed the forced commutated HVDC inverter and have concluded that it could be used to meet the reactive power at the inverter terminals. This investigation is a further technical appraisal involving a two terminal transmission scheme to a remote load with no ac generation at the load. Several possible inverter configurations are discussed. An electromagnetic transients program is used to model the system and simulate such aspects as start up, ac and dc faults and speed of response to voltage and frequency controls. The results indicate that such a scheme is indeed technically feasible and may be quite attractive from an economic and reliability point of view.

Turanli, H.M.; Menzies, R.W.; Woodford, D.A.

1984-06-01T23:59:59.000Z

69

Report of the Interagency Task Force on Carbon Capture and Storage, August 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report of the Report of the Interagency Task Force on Carbon Capture and Storage August 2010 Report of the Interagency Task Force on Carbon Capture and Storage 2 Table of Contents Executive Summary ..........................................................................................................................................7 Introduction ................................................................................................................................................7 Status of CCS Technologies ....................................................................................................................8 Status of CCS in the United States........................................................................................................9

70

ARI Task Force, ECA Work to Stimulate Regional Economies | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ARI Task Force, ECA Work to Stimulate Regional Economies ARI Task Force, ECA Work to Stimulate Regional Economies ARI Task Force, ECA Work to Stimulate Regional Economies DOE employees and ECA members discuss the Department's Asset Revitalization Initiative. DOE employees and ECA members discuss the Department's Asset Revitalization Initiative. WASHINGTON, D.C. - DOE's Asset Revitalization Initiative (ARI) Task Force met with the Energy Communities Alliance (ECA) this week to advance the Department's processes for transferring excess land and other assets to communities for beneficial reuse. "We greatly appreciate the opportunity to collaborate and work with DOE and the ARI program and fully support the work of the task force," ECA Executive Director Seth Kirshenberg said. Mark Gilbertson, EM Deputy Assistant Secretary for Site Restoration,

71

Blackout 2003: U.S. - Canada Task Force Presents Final Report onBlackout of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. - Canada Task Force Presents Final Report U.S. - Canada Task Force Presents Final Report onBlackout of August 2003 Blackout 2003: U.S. - Canada Task Force Presents Final Report onBlackout of August 2003 August 14, 2003, saw the worst blackout in North American history. Today, Spencer Abraham, U.S. Secretary of Energy, and the Honorable R. John Efford, Minister of Natural Resources Canada, released the Final Report of the U.S. -Canada Power System Outage Task Force. U.S. - Canada Task Force Presents Final Report on Blackout of August 2003 More Documents & Publications Blackout 2003: The August 14, 2003 Blackout One Year Later: Actions Taken in the United States and Canada To Reduce Blackout Risk Blackout 2003: Energy Secretary Bodman and Minister of Natural Resources for Canada Lunn Release the 2003 Power Outage Final Report, October 3, 2006

72

V.P. Biden Hosts the Middle Class Task Force | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

V.P. Biden Hosts the Middle Class Task Force V.P. Biden Hosts the Middle Class Task Force V.P. Biden Hosts the Middle Class Task Force November 9, 2010 - 10:38am Addthis John Schueler John Schueler Former New Media Specialist, Office of Public Affairs Editor's Note: This event has concluded. Today at 11:45 AM EST, Secretary Chu will join Vice President Biden at the White House as he hosts a Middle Class Task Force event to announce a series of federal actions designed to lay the groundwork for a strong, self-sustaining home energy efficiency retrofit industry. The Vice President and Secretary Chu will be joined by CEQ Chair Nancy Sutley, Secretary of Labor Hilda Solis and Secretary of Housing and Urban Development Shaun Donovan to announce a series of initiatives that seek to address recommendations from the October 2009 Middle Class Task Force

73

Interagency Task Force on Carbon Capture and Storage | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interagency Task Force on Carbon Interagency Task Force on Carbon Capture and Storage Interagency Task Force on Carbon Capture and Storage On February 3, 2010, President Obama sent a memorandum to the heads of fourteen Executive Departments and Federal Agencies establishing an Interagency Task Force on Carbon Capture and Storage. The goal was to develop a comprehensive and coordinated Federal strategy to speed the commercial development and deployment of clean coal technologies. The Task Force, co-chaired by the Department of Energy and the Environmental Protection Agency, was charged with proposing a plan to overcome the barriers to the widespread, cost-effective deployment of CCS within 10 years, with a goal of bringing five to 10 commercial demonstration projects online by 2016. Final Report

74

Secretary Chu to Join Vice President Biden at Middle Class Task Force Event  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vice President Biden at Middle Class Task Vice President Biden at Middle Class Task Force Event Tomorrow Secretary Chu to Join Vice President Biden at Middle Class Task Force Event Tomorrow November 8, 2010 - 12:00am Addthis WASHINGTON - Tomorrow, Tuesday, November 9th, at 11:45 AM EST, Vice President Biden will hold a Middle Class Task Force event to announce a series of federal actions designed to lay the groundwork for a strong, self-sustaining home energy efficiency retrofit industry. The initiatives being announced will address recommendations from the October 2009 Middle Class Task Force Recovery Through Retrofit report. The Vice President will be joined by CEQ Chair Nancy Sutley, Secretary of Energy Steven Chu, Secretary of Labor Hilda Solis, and Secretary of Housing and Urban Development Shaun Donovan.

75

Report of the Infrastructure Task Force of the Nuclear Energy Research  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the Infrastructure Task Force of the Nuclear Energy of the Infrastructure Task Force of the Nuclear Energy Research Advisory Committee Report of the Infrastructure Task Force of the Nuclear Energy Research Advisory Committee On October 1, 2002 the DOE Nuclear Energy Research Advisory Committee was asked to provide specific, focused updates to its Nuclear Science and Technology Infrastructure Roadmap and review the specific issues at the DOE key nuclear energy research and development (R&D) laboratories. This activity was assigned to a five-member Infrastructure Task Force (ITF). After receiving extensive written materials from DOE, the Idaho Nuclear Engineering and Environmental Laboratory (INEEL) and Argonne National Laboratory-West (ANL-W), on November 6-8, 2002 the ITF visited the Idaho site and received briefings and tours of the INEEL and ANL-W facilities.

76

Proceedings from EPRI's Improve Overall Substations Maintenance (37B) & HVCB Life Management (37F) Task Force  

Science Conference Proceedings (OSTI)

EPRI's Improve Overall Substations Maintenance (37B) and High Voltage Circuit Breaker (HVCB) Life Management (37F) Task Force met December 5, 2007, in San Antonio, Texas. This technical update contains the proceedings of the meeting.

2008-02-04T23:59:59.000Z

77

Preliminary report from the Task Force on detector R&D for the SSC  

Science Conference Proceedings (OSTI)

The Task Force has so far evaluated the R&D efforts required in the following categories: and are briefly discussed on the paper: Tracking devices; calorimetry; electronics; data acquisition; triggering; computing; muon detection; and new techniques.

NONE

1985-05-23T23:59:59.000Z

78

Oil Independent Oakland Action Plan: Recommendations by the OIO Task Force  

NLE Websites -- All DOE Office Websites (Extended Search)

Oil Independent Oakland Action Plan: Recommendations by the OIO Task Force Oil Independent Oakland Action Plan: Recommendations by the OIO Task Force to the City of Oakland to Reduce its Dependence on Oil Speaker(s): James Lutz Date: March 21, 2008 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Galen Barbose To avoid major disruptions anticipated by Peak Oil, the OIO Task Force recommends that the City of Oakland begin making a series of changes to reduce its dependence on oil in both the near term and long term. Many of the changes the Task Force recommends will take many years to implement but will have significant long term benefits that will help the City to avert potentially catastrophic economic, infrastructure and social repercussions. Given the long lead times required to change such things as transportation

79

EPRI CCAPI Task Force, Generic Interface Definition (GID): DRAFT-API Design for GID  

Science Conference Proceedings (OSTI)

This document reviews a common data access application program interface (API) which is supported by EPRI's Control Center Application Program Interface's (CCAPI) Task Force. The CCAPI Task Force is charged with producing standards to facilitate the integration of energy management system (EMS) applications developed independently or between an EMS system and other systems concerned with different aspects of power system operations, such as generation or distribution management systems (DMS). This is acc...

2000-06-30T23:59:59.000Z

80

Welcome to the second edition of C&W's Energy and Sustainability Task Force Ne  

NLE Websites -- All DOE Office Websites (Extended Search)

second edition of C&W's Energy and Sustainability Task Force Newsletter. This second edition of C&W's Energy and Sustainability Task Force Newsletter. This publication illustrates how C&W is delivering on its commitment to enhance the environmental performance of commercial real estate. C&W Managed Properties Earn LEED Volume Certification In January 2010, 18 properties under C&W management earned LEED (Leadership in Energy and Environmental Design) certification utilizing the U.S. Green Building Council's (USGBC) Portfolio Program and volume certification process. More than half of the properties certified at the Platinum and Gold levels. Working closely with our clients, C&W is

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Conference-EC-US Task Force Joint US-EU Workshop on Metabolomics and Environmental Biotechnology  

Science Conference Proceedings (OSTI)

Since 1990, the EC-US Task Force on Biotechnology Research has been coordinating transatlantic efforts to guide and exploit the ongoing revolution in biotechnology and the life sciences. The Task Force was established in June 1990 by the European Commission and the White House Office of Science and Technology Policy. The Task Force has acted as an effective forum for discussion, coordination, and development of new ideas for the last 18 years. Task Force members are European Commission and US Government science and technology administrators who meet annually to enhance communication across the Atlantic, and to encourage collaborative research. Through sponsoring workshops, and other activities, the Task Force also brings together scientific leaders and early career researchers from both sides of the Atlantic to forecast research challenges and opportunities and to promote better links between researchers. Over the years, by keeping a focus on the future of science, the Task Force has played a key role in establishing a diverse range of emerging scientific fields, including biodiversity research, neuroinformatics, genomics, nanobiotechnology, neonatal immunology, transkingdom molecular biology, biologically-based fuels, and environmental biotechnology. The EC-US Task Force has sponsored a number of Working Groups on topics of mutual transatlantic interest. The idea to create a Working Group on Environmental Biotechnology research was discussed in the Task Force meeting of October 1993. The EC-US Working Group on Environmental Biotechnology set as its mission 'To train the next generation of leaders in environmental biotechnology in the United States and the European Union to work collaboratively across the Atlantic.' Since 1995, the Working Group supported three kinds of activities, all of which focus one early career scientists: (1) Workshops on the use of molecular methods and genomics in environmental biotechnology; (2) Short courses with theoretical, laboratory and field elements; and (3) Short term exchange fellowships. The short term exchange fellowships were created to enable young scientists to develop collaborations with colleagues across the Atlantic and to learn a new skill or expertise in the area of environmental biotechnology.

PI: Lily Y. Young Co-PI: Gerben J. Zylstra

2009-06-04T23:59:59.000Z

82

Report of the State Geothermal Resources Task Force, State of California  

DOE Green Energy (OSTI)

The State Geothermal Resources Task Force has investigated the status of geothermal resources and development in California and in this report offers recommendations for overcoming obstacles facing increased utilization of this significant natural resource. For the most part, these recommendations are short-term solutions to immediate problems and would not radically change the roles of governmental agencies currently regulating geothermal development. The Task Force concludes that geothermal operations have been hindered by the lack of a statewide policy on geothermal development. This has resulted in instances where industry has been forced to comply with conflicting governmental policies toward geothermal energy development and environmental protection. The Task Force therefore recommends legislation establishing a statewide policy to encourage geothermal development consistent with environmental quality standards. In addition to geothermal resources suitable for the production of electrical power, California has extensive undeveloped hot water reservoirs suitable for direct thermal applications. The Energy Resources Conservation and Development Commission and the US Geological Survey have concluded that these resources, if developed, could make a significant contribution to satisfying California's energy needs. The Task Force therefore recommends establishing a statewide policy to encourage the use of non-electric hot water geothermal resources for commercial and non-commercial uses where the development is consistent with environmental quality concerns.

Warburg, Judith; Kirkham, Bill; Hannon, Theodore

1978-06-01T23:59:59.000Z

83

Task-related encumbrance methodology in force-on-force agent-based simulation  

Science Conference Proceedings (OSTI)

Soldiers today are faced with a number of challenges related to the operational environment that impact task performance and overall mission effectiveness. With each additional piece of equipment, the individual Soldier's load increases, potentially ... Keywords: decision support, encumbrance, load, physiological characteristics

Cortney Eldridge; Mitha Andra; Alexander Kennedy; Adam Peloquin; Daniel Rice; Steven Yuhaski, Jr.

2012-03-01T23:59:59.000Z

84

Developing a standardized test procedure for hybrid vehicles: The challenge of the SAE HEV task force  

DOE Green Energy (OSTI)

In 1992, the Society of Automotive Engineers (SAE) established a task force to develop a procedure for measuring electric energy consumption, all-electric range, fuel economy, and exhaust emissions for hybrid vehicles; the procedure will be submitted to regulatory agencies as representing the automotive industry`s recommendations. The draft procedure is currently being tested on hybrid vehicles. The University of Maryland`s parallel hybrid was tested in September 1994, and the University of California-Davis` parallel hybrid and the University of Illinois` series hybrid will be tested in November 1994 and January 1995, respectively. The procedure is being modified to incorporate any lessons learned, and the task force hopes to recommend the final procedure to the SAE by mid 1995.

Penney, T; Christensen, D [National Renewable Energy Lab., Golden, CO (United States); Poulos, S [General Motors Corp., Warren, MI (United States)

1994-11-01T23:59:59.000Z

85

Steam Generator Management Program: Steam Generator Foreign Object Task Force Review Material  

Science Conference Proceedings (OSTI)

Foreign objects entering a steam generator (SG) can result in significant damage to tubing. Foreign objects have caused utilities to plug tubes, extend inspections, and, in some cases, shut down due to primary-to-secondary leakage.BackgroundTo gain a better understanding of the significance of the foreign object problem relative to SGs, the Electric Power Research Institute (EPRI) Steam Generator Management Program (SGMP) assembled a task force in 2005 made ...

2013-08-09T23:59:59.000Z

86

Wind Supply Curves and Location Scenarios in the West: Summary of the Clean and Diverse Energy Wind Task Force Report; Preprint  

DOE Green Energy (OSTI)

This paper presents supply curves and scenarios that were developed by the Wind Task Force. Much of this information has been adapted from the original Wind Task Force report.

Milligan, M.; Parsons, B.; Shimshak, R.; Larson, D.; Carr, T.

2006-06-01T23:59:59.000Z

87

Report of the Interagency Task Force on Carbon Capture and Storage  

Science Conference Proceedings (OSTI)

Carbon capture and storage (CCS) refers to a set of technologies that can greatly reduce carbon dioxide (CO{sub 2}) emissions from new and existing coal- and gas-fired power plants, industrial processes, and other stationary sources of CO{sub 2}. In its application to electricity generation, CCS could play an important role in achieving national and global greenhouse gas (GHG) reduction goals. However, widespread cost-effective deployment of CCS will occur only if the technology is commercially available and a supportive national policy framework is in place. In keeping with that objective, on February 3, 2010, President Obama established an Interagency Task Force on Carbon Capture and Storage composed of 14 Executive Departments and Federal Agencies. The Task Force, co-chaired by the Department of Energy (DOE) and the Environmental Protection Agency (EPA), was charged with proposing a plan to overcome the barriers to the widespread, cost-effective deployment of CCS within ten years, with a goal of bringing five to ten commercial demonstration projects online by 2016. Composed of more than 100 Federal employees, the Task Force examined challenges facing early CCS projects as well as factors that could inhibit widespread commercial deployment of CCS. In developing the findings and recommendations outlined in this report, the Task Force relied on published literature and individual input from more than 100 experts and stakeholders, as well as public comments submitted to the Task Force. The Task Force also held a large public meeting and several targeted stakeholder briefings. While CCS can be applied to a variety of stationary sources of CO{sub 2}, its application to coal-fired power plant emissions offers the greatest potential for GHG reductions. Coal has served as an important domestic source of reliable, affordable energy for decades, and the coal industry has provided stable and quality high-paying jobs for American workers. At the same time, coal-fired power plants are the largest contributor to U.S. greenhouse gas (GHG) emissions, and coal combustion accounts for 40 percent of global carbon dioxide (CO{sub 2}) emissions from the consumption of energy. EPA and Energy Information Administration (EIA) assessments of recent climate and energy legislative proposals show that, if available on a cost-effective basis, CCS can over time play a large role in reducing the overall cost of meeting domestic emissions reduction targets. By playing a leadership role in efforts to develop and deploy CCS technologies to reduce GHG emissions, the United States can preserve the option of using an affordable, abundant, and domestic energy resource, help improve national security, help to maximize production from existing oil fields through enhanced oil recovery (EOR), and assist in the creation of new technologies for export. While there are no insurmountable technological, legal, institutional, regulatory or other barriers that prevent CCS from playing a role in reducing GHG emissions, early CCS projects face economic challenges related to climate policy uncertainty, first-of-a-kind technology risks, and the current high cost of CCS relative to other technologies. Administration analyses of proposed climate change legislation suggest that CCS technologies will not be widely deployed in the next two decades absent financial incentives that supplement projected carbon prices. In addition to the challenges associated with cost, these projects will need to meet regulatory requirements that are currently under development. Long-standing regulatory programs are being adapted to meet the circumstances of CCS, but limited experience and institutional capacity at the Federal and State level may hinder implementation of CCS-specific requirements. Key legal issues, such as long-term liability and property rights, also need resolution. A climate policy designed to reduce our Nation's GHG emissions is the most important step for commercial deployment of low-carbon technologies such as CCS, because it will create a stable, long-term framework for p

None

2010-08-01T23:59:59.000Z

88

NAC Ad-Hoc Task Force on Planetary Defense August 17 and 20, 2010 1 NASA ADVISORY COUNCIL (NAC)  

E-Print Network (OSTI)

Reich, Reporter (Nature), Charles Miller, NASA HQ; and Dan McGarthy, Johnson Space Center Task Force in detail the wording and organization of their final report to the NAC, editing previous drafts

89

Gulf of Mexico Regional Ecosystem Restoration Strategy, Gulf Coast Ecosystem Restoration Task Force, December 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

c c Gulf of Mexico Regional Ecosystem Restoration Strategy Gulf Coast Ecosystem Restoration Task Force December 2011 G u l f C o a s t E c o s y s t e m R e s t o r a t i o n T a s k F o r c e Cover Photo Credits: Brown pelicans: U.S. Fish and Wildlife Service Volunteer planting marsh grass: U.S. Fish and Wildlife Service, Steve Hillebrand Turtle: Texas Parks and Wildlife Department Wetlands: U.S. Fish and Wildlife Service Boats: Mississippi Development Authority, Tourism Division Nothing in this document is intended to create private rights of action or other enforceable individual legal rights. ©2011 Google Earth Map of Gulf of Mexico Coast US Gulf of Mexico Regional Ecosystem Restoration Strategy Gulf Coast Ecosystem Restoration Task Force December 2011 G u l f C o a s t E c o s y s t e m R e

90

Carbon Issues Task Force Report for the Idaho Strategic Energy Alliance  

SciTech Connect

The Carbon Issues Task Force has the responsibility to evaluate emissions reduction and carbon offset credit options, geologic carbon sequestration and carbon capture, terrestrial carbon sequestration on forest lands, and terrestrial carbon sequestration on agricultural lands. They have worked diligently to identify ways in which Idaho can position itself to benefit from potential carbon-related federal legislation, including identifying opportunities for Idaho to engage in carbon sequestration efforts, barriers to development of these options, and ways in which these barriers can be overcome. These are the experts to which we will turn when faced with federal greenhouse gas-related legislation and how we should best react to protect and provide for Idaho’s interests. Note that the conclusions and recommended options in this report are not intended to be exhaustive, but rather form a starting point for an informed dialogue regarding the way-forward in developing Idaho energy resources.

Travis L. Mcling

2010-10-01T23:59:59.000Z

91

Markus Popa, DOE (OCRWM) Bill Sherman, NE HLRW Task Force Robert Holden, NCAI  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Minutes Monday, November 3rd 2:00-3:00 p.m. (EST) Minutes Monday, November 3rd 2:00-3:00 p.m. (EST) Participants included: Markus Popa, DOE (OCRWM) Bill Sherman, NE HLRW Task Force Robert Holden, NCAI Mike Butler, UETC Bob Fronczak, AAR Kevin Blackwell, FRA Mike Butler (UETC) greeted participants and informed the group of previous notification by Robert Light (Mescalero Apache Tribe), Robert Centracco (FRA), and Mike Calhoun (FRA) that they would be unable to join the call. Mr. Butler began the call with a brief update on the status of Matrix 1, now entitled "Summary of Rail and Highway Regulations and their Applicability to States, Tribes, Shippers, and Carriers." He informed the group that he had completed an initial draft of the matrix, but that he was making substantial revisions to it and therefore he had not distributed it to the entire group for

92

Microsoft Word - Energy Code Enforcement Funding Task Force - Fact Sheet [Final].docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

By accepting State Energy Program funding under the American Recovery and Reinvestment Act (Recovery Act), states are required to submit and implement plans to By accepting State Energy Program funding under the American Recovery and Reinvestment Act (Recovery Act), states are required to submit and implement plans to achieve 90 percent compliance with building energy codes by 2017. 2 Yang, Brian, "Residential Energy Code Evaluations," Building Codes Assistance Project; 2005. More study is needed on current compliance rates and current spending on enforcement and compliance initiatives. DOE and the Pacific Northwest National Labs are developing a methodology to measure compliance rates. 3 Our model assumes an additional annual investment of $610 million, based on the task force estimate that under $200 million is currently being spent on compliance efforts.

93

Cavity method for force transmission in jammed disordered packings of hard particles  

E-Print Network (OSTI)

The force distribution of jammed disordered packings has always been considered a central object in the physics of granular materials. However, many of its features are poorly understood. In particular, analytic relations to other key macroscopic properties of jammed matter, such as the contact network and its coordination number, are still lacking. Here we develop a mean-field approach to this problem, based on the consideration of the contact network as a random graph where the force transmission becomes a constraint optimization problem. We can thus use the cavity method developed in the last decades within the statistical physics of spin glasses and hard computer science problems. This method allows us to compute the force distribution $\\text P(f)$ for random packings of hard particles of any shape, with or without friction. We find a new signature of jamming in the small force behavior $\\text P(f) \\sim f^{\\theta}$, whose exponent has attracted recent active interest. We find a finite value for $\\text P(f=0)$, along with $\\theta=0$ over an unprecedented six decades of force data, which agrees with experimental measurements on emulsion droplets. Furthermore, we relate the force distribution to a lower bound of the average coordination number ${\\bar z}_{\\rm c}^{\\rm min}(\\mu)$ of jammed packings of frictional spheres with coefficient $\\mu$. This bridges the gap between the two known isostatic limits ${\\bar z}_c(\\mu=0)=2D$ (in dimension $D$) and ${\\bar z}_c(\\mu \\to \\infty)=D+1$ by extending the naive Maxwell's counting argument to frictional spheres. The framework describes different types of systems, such as non-spherical objects and dimensions, providing a common mean-field scenario to investigate force transmission, contact networks and coordination numbers of jammed disordered packings.

Lin Bo; Romain Mari; Chaoming Song; Hernan A. Makse

2013-10-29T23:59:59.000Z

94

Seismic Evaluation Guidance: Augmented Approach for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1 – Seismic  

Science Conference Proceedings (OSTI)

Following the accident at the Fukushima Dai-ichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the U.S. Nuclear Regulatory Commission (NRC) established a Near-Term Task Force (NTTF) to conduct a systematic review of NRC processes and regulations. The NTTF was also tasked with determining if the agency should make additional improvements to its regulatory system.BackgroundThe NTTF developed a set of ...

2013-05-31T23:59:59.000Z

95

NAC Ad-Hoc Task Force on Planetary Defense July 8-9, 2010 CORRECTED 9/15/10 1 NASA ADVISORY COUNCIL (NAC)  

E-Print Network (OSTI)

-finding at NASA HQ. DISCUSSION Timeline for Ad-Hoc Task Force on Planetary Defense A brief discussion reiterated Force purview. · Ken Ford, NAC Chair, has requested from the Task Force a coherent, organized report, such as the National Research Council (NRC) report. · Key would be an individual at NASA HQ who would have a budget

96

Task Force on CO2 Storage Capacity Estimation for the Technical Group (TG) of the Carbon Sequestration Leadership Forum (CSLF)  

E-Print Network (OSTI)

Force has previously issued a Phase I report (in August 2005) which served to document the nature of the problem such as the relationship between assessment scale and the level of detail and resolution of the storage capacity. This report of the Task Force’s Phase II activities summarizes the Phase I findings and provides suggested methodologies for the estimation of CO2 storage capacity in three types of geologic structures: uneconomic coal beds, oil and gas reservoirs, and deep saline aquifers. Estimation of CO2 Storage Capacity in Geological Media

Stefan Bachu (canada; Didier Bonijoly (france; John Bradshaw (australia; Robert Burruss (usa; Niels Peter Christensen (ec; Sam Holloway (uk

2007-01-01T23:59:59.000Z

97

Compilation of reports prepared for the Secretary of Energy Advisory Board Task Force on Radioactive Waste Management  

SciTech Connect

This report contains reports prepared for the Secretary of Energy Advisory Board Task Force on Radioactive Waste Management, from experts in the United States. The contents of the report focus mainly on public opinion, and government policies as perceived by the public.

1993-11-01T23:59:59.000Z

98

Hydrothermal research and development assessment. Task force report: projections for electric systems  

DOE Green Energy (OSTI)

It is estimated that high temperature (greater than 150/sup 0/C or 300/sup 0/F) hydrothermal resources in the western United States have the potential for producing about 140,000 megawatts of electric power for 30 years. The objectives of the present analysis were to realistically evaluate the extent to which these resources might be utilized over the next 20 years, and to assess the probably impact of Federal programs on that utilization. The R and D assessment team interviewed industry personnel to determine the nature and the relative significance of investment decision criteria for developers and utilities. The results of these interviews were used to develop a probabilistic model to simulate the investment decision behavior of these two groups toward hydrothermal resources. Estimations of the characteristics of anticipated available resources (e.g., temperature, salinity, depth) and predictions of the geographic distribution of new resource discoveries were based upon the characteristics and distribution of known reservoirs. The impact of a minimal R and D program and the impact of expanded R and D program were estimated on the basis of its effect upon industry investment decision criteria (e.g., the cost of power). The Task Force estimates comparing three different scenarios: (1) no program, (2) minimal R and D, and (3) expanded R and D are presented.

Not Available

1982-05-01T23:59:59.000Z

99

WAVE TRANSMISSION AND MOORING-FORCE CHARACTERISTICS OF PIPE-TIRE FLOATING BREAKWATERS  

E-Print Network (OSTI)

Experimental Results Wave~Transmission Data Page a. PT-1Appendix C - Detailed Wave-Transmission Diagrams . 121 Listing dynamics and load-transmission characteristics. Goodyear

Harms, Volker W.

2013-01-01T23:59:59.000Z

100

Report of the Error and Emittance Task Force on the superconducting super collider: Part 1, Resistive machines  

SciTech Connect

A review of the design and specifications of the resistive accelerators in the SSC complex was conducted during the past year. This review was initiated in response to a request from the SSC Project Manager. The Error and Emittance Task Force was created October 30, 1992, and charged with reviewing issues associated with the specification of errors and tolerances throughout the injector chain and in the Collider, and to optimize the global error budget. Effects which directly impact the emittance budget were of prime importance. The Task Force responded to three charges: Examination of the resistive accelerators and their injection and extraction systems; examination of the connecting beamlines and the overall approach taken in their design; and global filling, timing, and synchronization issues. The High Energy Booster and the Collider were deemed to be sufficiently different from the resistive accelerators that it was decided to treat them as a separate group. They will be the subject of a second part to this report.

1993-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Responses to comments received on the draft final report of the Secretary of Energy Advisory Board Task Force on Radioactive Waste Management  

SciTech Connect

The Task Force solicited comments on its Draft Final Report from a variety of sources. Letters were sent to over 400 individuals who had expressed interest in the interest in the Department`s radioactive waste, management programs, a notice was placed in the Federal Register, the morning session of the January 1993 meeting of the full Secretary of Energy Advisory Board was given over to discussion of the draft, and Task Force members and staff presented the effort at several professional meetings. Altogether 32 written comments were received. They are reproduced here, followed in each case by the Task Force`s response to specific suggestions made to improve the draft. (The panel did not respond to comments that simply reflected policy preferences or that praised the group`s effort.) With one exception, those specific suggestions are highlighted and given a letter designation from {open_quotes}A{close_quotes} to {open_quotes}Z{close_quotes}. The Task Force`s responses, written in the Fall 1993, are labeled in a like manner. For the one exception, a comments submitted by Judy Treichel, the Task Force`s response is printed on copies of her annotated pages.

Not Available

1994-10-01T23:59:59.000Z

102

Seismic Walkdown Guidance: For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic  

Science Conference Proceedings (OSTI)

Following the accident at the Fukushima Daiichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the NRC established the Near Term Task Force (NTTF) in response to Commission direction. The NTTF issued a report that made a series of recommendations, some of which were to be acted upon "without unnecessary delay." Subsequently, the NRC issued a 50.54(f) Letter that requests information to assure that these recommendations are addressed by all U.S. nucl...

2012-06-04T23:59:59.000Z

103

Beryllium Health and Safety Committee Data Reporting Task Force White Paper #2 -- Uses of Uncensored Data  

SciTech Connect

On December 8, 1999, the Department of Energy (DOE) published Title 10 CFR 850 (hereafter referred to as the Rule) to establish a chronic beryllium disease prevention program (CBDPP) to: (1) reduce the number of workers currently exposed to beryllium in the course of their work at DOE facilities managed by DOE or its contractors; (2) minimize the levels of, and potential for, exposure to beryllium; and (3) establish medical surveillance requirements to ensure early detection of the disease. On January 4, 2001, DOE issued DOE G 440.1-7A, Implementation Guide for use with 10 CFR 850, Chronic Beryllium Disease Prevention Program, to assist line managers in meeting their responsibilities for implementing the CBDPP. That guide describes methods and techniques that DOE considers acceptable in complying with the Rule. In 2005 a draft DOE Technical Standard ''Management of Items and Areas Containing Low Levels of Beryllium'' (SAFT 0103; hereafter referred to as the ''TS'') was circulated for comment (http://www.hss.energy.gov/NuclearSafety/techstds/tsdrafts/saft-0103.pdf). DOE technical standards are voluntary consensus standards developed when industry standards do not exist (see http://www.hss.energy.gov/NuclearSafety/techstds/index.html for more information). DOE does not require its field elements to implement DOE technical standards, but field elements may choose to adopt these standards to meet specific needs. This beryllium TS is intended to provide best practices and lessons learned for manageing items and areas that contain low levels of beryllium, which has been a costly and technically challenging component of CBDPPs. The TS is also intended to provide guidance for determining if the Rule's housekeeping and release criteria are met. On challenge the TS addressed was the statistical interpretation of data sets with non-detected results, a topic for which no strong consensus exists. Among the many comments on the draft TS was a suggestion that certain of the statistical comparisons described in the TS could be better implemented if analytical results, even when below a reporting limit, were to be reported by analytical laboratories. See Appendix 1 for a review of terminology related to reporting limits. The Beryllium Health and Safety Committee (BHSC) formed a Sampling and Analysis Subcommittee (SAS) in 2003. The SAS established a working group on accreditation and reporting limits. By 2006 it had become evident that the issues extended to data reporting as a whole. The SAS proposed to the BHSC the formation of a Data Reporting Task Force (DRTF) to consider issues related to data reporting. The BHSC Board agreed, and requested that the DRTF generate a white paper, to be offered by the BHSC to potential interested parties such as the DOE policy office that is responsible for beryllium health and safety policy. It was noted that additional products could include detailed guidance and potentially a journal article in the future. The SAS proposed that DRTF membership represent the affected disciplines (chemists, industrial hygiene professionals and statisticians, and the DOE office that is responsible for beryllium health and safety policy). The BHSC Board decided that DRTF membership should come from DOE sites, since the focus would be on reporting in the context of the TS and the Rule. The DRTF came into existence in late 2006. The DRTF membership includes industrial hygienists, analytical chemists and laboratory managers, members of the regulatory and oversight community, and environmental statisticians. A first White Paper, ''Summary of Issues and Path Forward'', was reviewed by the BHSC in March 2007 and issued by the DRTF in June 2007. It describes the charter of the DRTF, introduces some basic terminology (reproduced here in Appendix 1), lays out the issues the DRTF is expected to address, and describes a path forward for the DRTF's work. This first White Paper is available through the BHSC web site. This White Paper presents recommendations developed by the DRTF following the process laid out in that first White Pap

MacQueen, D H

2007-10-10T23:59:59.000Z

104

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

105

Development of residential-conservation-survey methodology for the US Air Force. Interim report. Task two  

DOE Green Energy (OSTI)

A US Air Force (USAF) Residential Energy Conservation Methodology was developed to compare USAF needs and available data to the procedures of the Residential Conservation Service (RCS) program as developed for general use by utility companies serving civilian customers. Attention was given to the data implications related to group housing, climatic data requirements, life-cycle cost analysis, energy saving modifications beyond those covered by RCS, and methods for utilizing existing energy consumption data in approaching the USAF survey program. Detailed information and summaries are given on the five subtasks of the program. Energy conservation alternatives are listed and the basic analysis techniques to be used in evaluating their thermal performane are described. (MCW)

Abrams, D. W.; Hartman, T. L.; Lau, A. S.

1981-11-13T23:59:59.000Z

106

Executive Summary of the Report of the Interagency Task Force on Carbon Capture and Storage, August 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Summary: Executive Summary: Report of the Interagency Task Force on Carbon Capture and Storage August 2010 Executive Summary 1 Executive Summary Introduction Carbon capture and storage (CCS) refers to a set of technologies that can greatly reduce carbon dioxide (CO 2 ) emissions from new and existing coal- and gas-fired power plants, industrial processes, and other stationary sources of CO 2 . In its application to electricity generation, CCS could play an important role in achieving national and global greenhouse gas (GHG) reduction goals. However, widespread cost-effective deployment of CCS will occur only if the technology is commercially available and a supportive national policy framework is in place. In keeping with that objective, on February 3, 2010, President Obama established an

107

Sustainable energy for all. Technical report of task force 1 in support of the objective to achieve universal access to modern energy services by 2030  

SciTech Connect

The UN Secretary General established the Sustainable Energy for All initiative in order to guide and support efforts to achieve universal access to modern energy, rapidly increase energy efficiency, and expand the use of renewable energies. Task forces were formed involving prominent energy leaders and experts from business, government, academia and civil society worldwide. The goal of the Task Forces is to inform the implementation of the initiative by identifying challenges and opportunities for achieving its objectives. This report contains the findings of Task Force One which is dedicated to the objective of achieving universal access to modern energy services by 2030. The report shows that universal energy access can be realized by 2030 with strong, focused actions set within a coordinated framework.

Birol, Fatih [International Energy Agency, Paris (France); Brew-Hammond, Abeeku (University of Science and Technology (Ghana

2012-04-15T23:59:59.000Z

108

Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic  

Science Conference Proceedings (OSTI)

Following the accident at the Fukushima Daiichi nuclear power plant resulting from the March 11, 2011, Great Tohoku Earthquake and subsequent tsunami, the Nuclear Regulatory Commission (NRC) established a Near Term Task Force (NTTF) to conduct a systematic review of NRC processes and regulations. The NTTF was also tasked with determining if the agency should make additional improvements to its regulatory system.BackgroundThe NTTF developed a set of ...

2013-02-28T23:59:59.000Z

109

The Effect of Transmission Design on Force-Controlled Manipulator Performance  

E-Print Network (OSTI)

Previous research in force control has focused on the choice of appropriate servo implementation without corresponding regard to the choice of mechanical hardware. This report analyzes the effect of mechanical properties ...

Townsend, William T. (William Thomas)

1988-04-01T23:59:59.000Z

110

Recommended mission directed goals for electric vehicle battery research and development. The task force on electric vehicle battery goals  

SciTech Connect

Research and development goal packages were developed for the state-of-the-art, flow-through, and bipolar lead-acid batteries, nickel/iron, nickel/zinc, nickel/cadmium, zinc/bromine, iron/air, lithium/iron sulfide, and sodium/sulfur technologies. Since each battery must satisfy mission power/energy requirements throughout every cycle of its operating life, the principal ''design point'' is the end-of-life condition. Since all batteries exhibit deteriorating performance with age, excess kWh capacity of 20 to 30 percent is required early in life. The Battery Panel first identified present state-of-the-art performance characteristics and design interrelationships for each battery technology, and projected the degree of advance expected by 1995. Near-term and 1995 design tradeoffs were modeled using the EVA computerized system developed by ANL. The next step was to target each battery system for a single range (80, 120 or 160 km), depending on its projected 1995 capabilities. For each battery, baseline calculations were carried out assuming the maximum battery weight (695 kg) to be on board. In addition to performance, life, and cost goals, development targets were also established for efficiency, maintenance, and allowable self-discharge rate. The Task Force attempted to establish battery cost requirements, assuming economic parity (in 1995) with other modes of transportation.

Not Available

1986-03-01T23:59:59.000Z

111

ATLAS Metadata Task Force  

E-Print Network (OSTI)

stage contain events from that block and trigger chain. This1] ATLAS Raw Event Format in Trigger & DAQ, https://across ATLAS. EF Event Filter (third level trigger): farm of

Costanzo, D.; ATLAS Collaboration

2009-01-01T23:59:59.000Z

112

EPRI Increased Transmission Capacity Workshop Proceedings  

Science Conference Proceedings (OSTI)

This report documents the proceedings of EPRI's Increased Overhead Transmission Capacity Workshop. The workshop was held on September 20, 2011 at the offices of the American Transmission Company in Waukesha, Wisconsin. Participants included members of the EPRI Increased Overhead Transmission Capacity Task Force. The workshop was a joint effort of two EPRI research projects: (1) Increased Power Flow Guidebook and Ratings for Overhead Lines, and (2) Impact of High Temperature Operation on Conductor Systems...

2011-11-30T23:59:59.000Z

113

[Environmental investigation of ground water contamination at Wright- Patterson Air Force Base, Ohio]. Volume 4, Health and Safety Plan (HSP); Phase 1, Task 4 Field Investigation report: Draft  

SciTech Connect

This Health and Safety Plan (HSP) was developed for the Environmental Investigation of Ground-water Contamination Investigation at Wright-Patterson Air Force Base near Dayton, Ohio, based on the projected scope of work for the Phase 1, Task 4 Field Investigation. The HSP describes hazards that may be encountered during the investigation, assesses the hazards, and indicates what type of personal protective equipment is to be used for each task performed. The HSP also addresses the medical monitoring program, decontamination procedures, air monitoring, training, site control, accident prevention, and emergency response.

Not Available

1991-10-01T23:59:59.000Z

114

Oak Ridge Reservation volume I. Y-12 mercury task force files: A guide to record series of the Department of Energy and its contractors  

Science Conference Proceedings (OSTI)

The purpose of this guide is to describe each of the series of records identified in the documents of the Y-12 Mercury Task Force Files that pertain to the use of mercury in the separation and enrichment of lithium isotopes at the Department of Energy`s (DOE) Y-12 Plant in Oak Ridge, Tennessee. History Associates Incorporated (HAI) prepared this guide as part of DOE`s Epidemiologic Records Inventory Project, which seeks to verify and conduct inventories of epidemiologic and health-related records at various DOE and DOE contractor sites. This introduction briefly describes the Epidemiologic Records Inventory Project and HAI`s role in the project. Specific attention will be given to the history of the DOE-Oak Ridge Reservation, the development of the Y-12 Plant, and the use of mercury in the production of nuclear weapons during the 1950s and early 1960s. This introduction provides background information on the Y-12 Mercury Task Force Files, an assembly of documents resulting from the 1983 investigation of the Mercury Task Force into the effects of mercury toxicity upon workplace hygiene and worker health, the unaccountable loss of mercury, and the impact of those losses upon the environment. This introduction also explains the methodology used in the selection and inventory of these record series. Other topics include the methodology used to produce this guide, the arrangement of the detailed record series descriptions, and information concerning access to the collection.

NONE

1995-02-17T23:59:59.000Z

115

Sustainable energy for all. Technical report of task force 2 in support of doubling the global rate of energy efficiency improvement and doubling the share of renewable energy in the global energy mix by 2030  

SciTech Connect

The UN Secretary General established the Sustainable Energy for All initiative in order to guide and support efforts to achieve universal access to modern energy, rapidly increase energy efficiency, and expand the use of renewable energies. Task forces were formed involving prominent energy leaders and experts from business, government, academia and civil society worldwide. The goal of the Task Forces is to inform the implementation of the initiative by identifying challenges and opportunities for achieving its objectives. This report contains the findings of Task Force Two which is dedicated energy efficiency and renewable energy objectives. The report shows that doubling the rate of energy efficiency improvements and doubling the share of energy from renewable sources by 2030 is challenging but feasible if sufficient actions are implemented. Strong and well-informed government policies as well as extensive private investment should focus on the high impact areas identified by the task force.

Nakicenovic, Nebojsa [International Institute for Applied Systems Analysis and Vienna University of Technology (Austria); Kammen, Daniel [Univ. of California, Berkeley, CA (United States); Jewell, Jessica [International Institute for Applied Systems Analysis (Austria)

2012-04-15T23:59:59.000Z

116

Activities of the Oil Implementation Task Force, December 1990--February 1991; Contracts for field projects and supporting research on enhanced oil recovery, April--June 1990  

Science Conference Proceedings (OSTI)

The Oil Implementation Task Force was appointed to implement the US DOE's new oil research program directed toward increasing domestic oil production by expanded research on near- or mid-term enhanced oil recovery methods. An added priority is to preserve access to reservoirs that have the largest potential for oil recovery, but that are threatened by the large number of wells abandoned each year. This report describes the progress of research activities in the following areas: chemical flooding; gas displacement; thermal recovery; resource assessment; microbial technology; geoscience technology; and environmental technology. (CK)

Tiedemann, H.A. (ed.) (USDOE Bartlesville Project Office, OK (USA))

1991-03-01T23:59:59.000Z

117

Public comments and Task Force responses regarding the environmental survey of the reprocessing and waste management portions of the LWR fuel cycle  

SciTech Connect

This document contains responses by the NRC Task Force to comments received on the report ''Environmental Survey of the Reprocessing and Waste Management Portions of the LWR Fuel Cycle'' (NUREG-0116). These responses are directed at all comments, inclding those received after the close of the comment period. Additional information on the environmental impacts of reprocessing and waste management which has either become available since the publication of NUREG-0116 or which adds requested clarification to the information in that document.

1977-03-01T23:59:59.000Z

118

Activities of the Oil Implementation Task Force; Contracts for field projects and supporting research on enhanced oil recovery, July--September 1990  

SciTech Connect

The report contains a general introduction and background to DOE's revised National Energy Strategy Advanced Oil Recovery Program and activities of the Oil Implementation Task Force; a detailed synopsis of the symposium, including technical presentations, comments and suggestions; a section of technical information on deltaic reservoirs; and appendices containing a comprehensive listing of references keyed to general deltaic and geological aspects of reservoirs and those relevant to six selected deltaic plays. Enhanced recovery processes include chemical floodings, gas displacement, thermal recovery, geoscience, and microbial recovery.

Tiedemann, H.A. (ed.) (USDOE Bartlesville Project Office, OK (USA))

1991-05-01T23:59:59.000Z

119

Activities of the Oil Implementation Task Force; Contracts for field projects and supporting research on enhanced oil recovery, July--September 1990  

SciTech Connect

The report contains a general introduction and background to DOE's revised National Energy Strategy Advanced Oil Recovery Program and activities of the Oil Implementation Task Force; a detailed synopsis of the symposium, including technical presentations, comments and suggestions; a section of technical information on deltaic reservoirs; and appendices containing a comprehensive listing of references keyed to general deltaic and geological aspects of reservoirs and those relevant to six selected deltaic plays. Enhanced recovery processes include chemical floodings, gas displacement, thermal recovery, geoscience, and microbial recovery.

Tiedemann, H.A. (ed.) (USDOE Bartlesville Project Office, OK (USA))

1991-05-01T23:59:59.000Z

120

Report on equipment availability for the ten-year period, 1967--1976. A report of the Equipment Availability Task Force of the Prime Movers Committee  

DOE Green Energy (OSTI)

Data are tabulated on the availability and outage rates for all types of electric power generating plants operating in the U.S. during the period from 1967 through 1976. The power plant types include fossil-fueled, nuclear, hydro, and pumped storage. The outages include those scheduled for maintenance and normal operation and unplanned or forced outages. (LCL)

Haueter, R.L.; Haddad, E.E.; Brickell, M.C.; Poeppelmeier, V.E.; Prestele, J.A.; Roettger, R.W.; Thompson, W.H.; Weiser, J.L.; Whooley, J.P.

1977-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Power System Transmission Protection: Proposed R&D Projects  

Science Conference Proceedings (OSTI)

The U.S.-Canada task force on the August 14, 2003 power system outage that affected 50 million people concluded that inappropriate and uncoordinated relay protection settings were one of the three principal reasons that the cascade outage spread beyond Ohio and caused the widespread blackout. Based on input from utilities and other stakeholders at a recent protection workshop, this report proposes four R&D project to help meet needs in the transmission protection area.

2005-09-14T23:59:59.000Z

122

Task Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Plans Task Plans This page contains links to a tentative listing of active and closed TEC Task Plans. Final status of these task plans will be determined after the July 2000 TEC meeting. Task Plan Number/Title DOE Lead Staff Last Update Comment Status/ New No. After 7/27/00 GP-1, Section 180(c) Coordination (begun 1/96) C. Macaluso 7/98 DOE published a Revised Proposed Policy and Procedures in April 1998; no final policy will be issued until a definitive date for NWPA shipments is determined, based on site suitability or other legislative direction. To the extent that any issues related to Section 180(c) arise in TEC meetings, they are being discussed in the context of the consolidated grant topic group which is covered by another task plan. Closed

123

2009 National Electric Transmission Congestion Study - San Francisco  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San San Francisco Workshop 2009 National Electric Transmission Congestion Study - San Francisco Workshop On June 11, 2008, DOE hosted a regional pre-study workshop in San Francisco, CA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 6-11-08 Congestion Workshop Agenda - San Francisco, CA.pdf Transcript - 2009 National Electric Transmission Congestion Study San Francisco Workshop.pdf California Initiatives To Be Considered in DOE's 2009 Congestion Study, submitted at 2009 Congestion Study San Francisco workshop.pdf Arizona Renewable Transmission Task Force BTA Response, submitted at 2009 Congestion Study San Francisco workshop.pdf

124

2009 National Electric Transmission Congestion Study - San Francisco  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San San Francisco Workshop 2009 National Electric Transmission Congestion Study - San Francisco Workshop On June 11, 2008, DOE hosted a regional pre-study workshop in San Francisco, CA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 6-11-08 Congestion Workshop Agenda - San Francisco, CA.pdf Transcript - 2009 National Electric Transmission Congestion Study San Francisco Workshop.pdf California Initiatives To Be Considered in DOE's 2009 Congestion Study, submitted at 2009 Congestion Study San Francisco workshop.pdf Arizona Renewable Transmission Task Force BTA Response, submitted at 2009 Congestion Study San Francisco workshop.pdf

125

Transmission INTRODUCTION  

E-Print Network (OSTI)

Transmission INTRODUCTION An electrical power system requires constant, second by second, balancing to maintain control over the transmission system can result in failure of the entire electrical system of supply, demand, and transmission capability. Transmission system operators are primarily responsible

126

Privacy - Information Protection Task Force - Charter | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Policy Framework for a 21st Century Grid: Enabling our Secure Energy Future (July 12, 2011) Information Security: Coordination of Federal Cyber Security Research and Development...

127

Solar Energy Task Force Report Technical Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

swimming pool type, a single-glazed nonselective flat plate, a double-glazed selective flat plate, an evacuated tube module, and a concentrating parabolic tracker. Air systems...

128

Internet Policy Task Force Cybersecurity Green Paper  

Science Conference Proceedings (OSTI)

... 8/1/2011, Visa. 8/1/2011, Thomson Reuters. 8/1/2011, TechAmerica. 8/1/2011, Google, Inc. 8/1/2011, Joyce Dillard. 8/1/2011, CAUCE North America ...

2012-06-04T23:59:59.000Z

129

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

Modeling Task  Force white paper, October 2006.   Lu, N. , system simulations.   This white  paper examines the use of task reports  and white papers.  (See appendices. )  The 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

130

Nonlinear magnetoinductive transmission lines  

E-Print Network (OSTI)

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent cap...

Lazarides, Nikos; Tsironis, G P

2011-01-01T23:59:59.000Z

131

National Electric Transmission Study 2006 Western Interconnection Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Interconnection Western Interconnection 2006 Congestion Assessment Study Prepared by the Western Congestion Analysis Task Force May 08, 2006 2 Western Interconnection 2006 Congestion Study - DOE Task 3 - 1. 2008 Modeling Study 2. 2015 Modeling Study - 2015 Planned Resource Development (IRPs and RPS) 3. W.I. Historical Path Usage Studies - 1999 thru 2005 - Physical congestion - Commercial congestion 3 WCATF Modeling Studies ABB Gridview Model * Model uses WECC 2005 L&R load forecast, modified with NPCC data for the NW, RMATS load forecasts for the Rocky Mtn area and the latest CEC load forecast for California * Hourly load shapes were developed using FERC 714 * Incremental transmission was added to a WECC 2008 case to represent 2015 network topology * WECC path ratings were used, modified as necessary to more closely

132

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

133

Microsoft PowerPoint - WAPA Transmission Developments in NM ...  

NLE Websites -- All DOE Office Websites (Extended Search)

authorities: NM, CO, WY, KS, ND, UT, SD & ID Tasked with planning and financing of transmission lines within their respective states RETA has the additional requirement that...

134

The Valley Group, Inc. CAT-1 TM Transmission Line Monitoring Systems  

E-Print Network (OSTI)

We wish to commend the CEC on its leadership role in exploring all facets of renewable energy, especially wind resource development and related transmission system issues. The Valley Group has been involved with numerous studies relating to wind farm transmission access, and is directly involved with several IEEE and CIGRE task force initiatives related to wind as it specifically relates to transmission line capacity. We are pleased to have this opportunity to share our findings with the commission. With regard to the workshop questions posed on physical limits of existing transmission facilities and methods to facilitate access to renewable resources, we wish to call your attention to some actual results observed at a utility in the southwest U.S. using Dynamic Line Rating technology to optimize access to wind farm energy production while ensuring transmission grid reliability, all at minimal cost to the utility and its ratepayers. The bottom line is that Dynamic Line Rating technology enables transmission system operators to utilize the natural correlation that exists between wind farm output and real (not assumed) transmission line capacity. This is not theorized, but rather has been proven and successfully implemented. We strongly recommend that CEC and CPUC take the time to fully understand Dynamic Line Rating

Commissioner John; L. Geesman

2004-01-01T23:59:59.000Z

135

"Department of Energy Information Protection Task Force - SSN Reduction Project PA 09-Baseline Inventory",,,,,,,,,,,,,"1. Not Cost Effective","2. No Resources Available","3. Legally Required to Collect and/or Maintain","4. Other - Explain in Column ""R"""  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Information Protection Task Force - SSN Reduction Project PA 09-Baseline Inventory",,,,,,,,,,,,,"1. Not Cost Effective","2. No Resources Available","3. Legally Required to Collect and/or Maintain","4. Other - Explain in Column ""R""" Department of Energy Information Protection Task Force - SSN Reduction Project PA 09-Baseline Inventory",,,,,,,,,,,,,"1. Not Cost Effective","2. No Resources Available","3. Legally Required to Collect and/or Maintain","4. Other - Explain in Column ""R""" "DOE Privacy Website: http://management.energy.gov/FOIA/privacy.htm",,,,,,,,,,,,,"Yes","No","N/A" ,"1. Departmental Element","2. System Name/ Major Application Name","3. Location","4. Name of System Owner/ Information or Data Owner","5. Contact Information","6. Does the system collect or maintain Social Security numbers?","7. Source of Legal Requirement/Authority to Collect or Maintain Social Security Numbers?","8. Does the system have a Privacy Impact Assessment (PIA)?","9. Does the system have a System of Records Notice (SORN)? If yes, provide the name of the System of Records Notice.","10. Does the system collect or maintain other forms of PII?","Comments"

136

Task Routing for Prediction Tasks Haoqi Zhang  

E-Print Network (OSTI)

Harvard SEAS Microsoft Research Cambridge, MA 02138, USA Redmond, WA 98052, USA {hq, yiling, parkes, Economics, Theory Keywords Scoring rules, task routing, social networks 1. INTRODUCTION Organizations rely is crucial for the suc- cess of an organization. Accomplishing a task may require the expertise of multiple

Chen, Yiling

137

Cooperation (Transmission  

E-Print Network (OSTI)

Pricing in Wireless Networks Peter Marbach Department of Computer Science University of Toronto #12; Model/Terminology A B #15; Routes are Fixed #15; C r : Capacity of Node r #15; U r (x r ): Utility Function of Node r 6 #12; Model/Terminology #15; x r : Transmission Rate of Node r #15; y r

Marbach, Peter

138

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

139

The US market for high-temperature superconducting wire in transmission cable applications  

SciTech Connect

Telephone interviews were conducted with 23 utility engineers concerning the future prospects for high-temperature superconducting (HTS) transmission cables. All have direct responsibility for transmission in their utility, most of them in a management capacity. The engineers represented their utilities as members of the Electric Power Research Institute`s Underground Transmission Task Force (which has since been disbanded). In that capacity, they followed the superconducting transmission cable program and are aware of the cryogenic implications. Nineteen of the 23 engineers stated the market for underground transmission would grow during the next decade. Twelve of those specified an annual growth rate; the average of these responses was 5.6%. Adjusting that figure downward to incorporate the remaining responses, this study assumes an average growth rate of 3.4%. Factors driving the growth rate include the difficulty in securing rights-of-way for overhead lines, new construction techniques that reduce the costs of underground transmission, deregulation, and the possibility that public utility commissions will allow utilities to include overhead costs in their rate base. Utilities have few plans to replace existing cable as preventive maintenance, even though much of the existing cable has exceeded its 40-year lifetime. Ten of the respondents said the availability of a superconducting cable with the same life-cycle costs as a conventional cable and twice the ampacity would induce them to consider retrofits. The respondents said a cable with those characteristics would capture 73% of their cable retrofits.

Forbes, D.

1996-04-01T23:59:59.000Z

140

Nuclear forces  

Science Conference Proceedings (OSTI)

These lectures present an introduction into the theory of nuclear forces. We focus mainly on the modern approach

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

142

OOTW Force Design Tools  

Science Conference Proceedings (OSTI)

This report documents refined requirements for tools to aid the process of force design in Operations Other Than War (OOTWs). It recommends actions for the creation of one tool and work on other tools relating to mission planning. It also identifies the governmental agencies and commands with interests in each tool, from whom should come the user advisory groups overseeing the respective tool development activities. The understanding of OOTWs and their analytical support requirements has matured to the point where action can be taken in three areas: force design, collaborative analysis, and impact analysis. While the nature of the action and the length of time before complete results can be expected depends on the area, in each case the action should begin immediately. Force design for OOTWs is not a technically difficult process. Like force design for combat operations, it is a process of matching the capabilities of forces against the specified and implied tasks of the operation, considering the constraints of logistics, transport and force availabilities. However, there is a critical difference that restricts the usefulness of combat force design tools for OOTWs: the combat tools are built to infer non-combat capability requirements from combat capability requirements and cannot reverse the direction of the inference, as is required for OOTWs. Recently, OOTWs have played a larger role in force assessment, system effectiveness and tradeoff analysis, and concept and doctrine development and analysis. In the first Quadrennial Defense Review (QDR), each of the Services created its own OOTW force design tool. Unfortunately, the tools address different parts of the problem and do not coordinate the use of competing capabilities. These tools satisfied the immediate requirements of the QDR, but do not provide a long-term cost-effective solution.

Bell, R.E.; Hartley, D.S.III; Packard, S.L.

1999-05-01T23:59:59.000Z

143

Airspace: Antarctic Sound Transmission  

E-Print Network (OSTI)

Antarctic Sound Transmission Andrea Polli Director,investigates how sound transmission can contribute to thePoles. How have such transmission-based projects developed

Polli, Andrea

2009-01-01T23:59:59.000Z

144

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

145

Great Plains Wind Energy Transmission Development Project  

DOE Green Energy (OSTI)

In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

2012-06-09T23:59:59.000Z

146

Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WORKSHOP WORKSHOP DOUBLETREE CRYSTAL CITY NOVEMBER 1-2, 2012 Anjan Bose, Grid Tech Team U.S. Department of Energy DOE Grid Tech Team (GTT)  The Grid Tech Team (GTT), established by the Office of the Undersecretary of Energy, was tasked with coordinating grid-related activities across the Department and accelerating modernization of the electric power system.  Currently, the GTT comprise of representatives from OE, EERE, ARPA-E, Fossil Energy, Science, Policy and International Affairs, CFO, and the Office of the Secretary of Energy. Vision of the Future Grid A seamless, cost-effective electricity system, from generation to end- use, capable of meeting all clean energy demands and capacity requirements, while allowing consumer participation and electricity

147

Influence of external forces on the behaviour of redundant manipulators  

Science Conference Proceedings (OSTI)

The paper considers the influence of external forces on the behaviour of a redundant manipulator. It is assumed that the forces can act anywhere on the body of the manipulator. First, the equivalent generalized forces in the task space and the null space ... Keywords: Control algorithm, External forces, Position accuracy, Redundant manipulators

Leon Žlajpah

1999-05-01T23:59:59.000Z

148

Task Routing for Prediction Tasks Haoqi Zhang  

E-Print Network (OSTI)

Harvard SEAS Microsoft Research Cambridge, MA 02138, USA Redmond, WA 98052, USA {hq, yiling, parkes. INTRODUCTION Organizations rely on a mix of expertise and on means for identifying and harnessing expertise effectively is crucial for the success of an organization. Accomplishing a task may require the expertise

Chen, Yiling

149

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

150

Hydromechanical transmission  

DOE Patents (OSTI)

A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

Orshansky, Jr. deceased, Elias (LATE OF San Francisco, CA); Weseloh, William E. (San Diego, CA)

1978-01-01T23:59:59.000Z

151

Registration, Force Protection Equipment Demonstration - May 2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Registration, Force Protection Equipment Demonstration - May 2009 Registration, Force Protection Equipment Demonstration - May 2009 Registration, Force Protection Equipment Demonstration - May 2009 May 2009 Demonstrating commercially availale physical security/force protection soultions around the world The bombing of Khobar Towers in Saudi Arabia on 25 June 1996 revealed the need for continal vigilance and protection againist terrorist forces intent on harming US personnel and interests. The Chairman if the Joint Chiefs of Staff directed the Services to investigate COTS equipments solutions for physical security/force protection needs. The Office of the Under Secretary of Defense for Acquistion, Technology, and Logistics (OUSD {at&l}) tasked the Office of the US Army Product Manager, force Protection Systems (PM-FPS), to coordiante and facilitate a Force Protection Equipment

152

JAMAICA BAY TASK FORCE MEETING Tuesday April 6, 2010  

E-Print Network (OSTI)

Len Houston, U.S. Army Corps of Engineers (USACE) 7:30 Liquefied Natural Gas (LNG) Update Dan Mundy Jr., Jamaica Bay EcoWatchers 7:50 Recent Nitrogen Agreement with NYC Brad Sewell, Natural Resources Defense

Columbia University

153

Task Force for Strategic Developments to Blue Ribbon Commission Recommendations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ribbon Commission Report and Ribbon Commission Report and Transportation Program Corinne Macaluso National Transportation Stakeholders Forum Knoxville, Tennessee May 16, 2012 2  Formed at the direction of the President to Secretary Chu and included leading experts.  Purpose to conduct a comprehensive review of polices for managing the back end of the nuclear fuel cycle; i.e., recycle before storage and permanent disposal.  Detailed analysis, with eight major recommendations; also recommended near-term actions. Blue Ribbon Commission & Report MAY 2012 3 Scope of Commission's Recommendation and Internal Assessment 1. A new, consent-based approach to siting future nuclear waste management facilities. 2. A new organization dedicated solely to implementing the waste

154

United States of America Electric Energy Market Competition Task Force  

E-Print Network (OSTI)

Energy Information Administration EIR environmental impact review EIS environmental impact statement ELCC Panel on Climate Change IRP integrated resource planning ISET Institute for Solar Energy Technology (Institut für Solare Energieversorgungstechnik) ISO independent system operator 20% Wind Energy by 2030xii

Tesfatsion, Leigh

155

Solar energy task force report technical training guidelines  

DOE Green Energy (OSTI)

Guidelines are offered for programs oriented to commercial applications in solar energy, specifically water and space heating. These technologies are examined because they are, in some cases, economicaly feasible. Sample curricula and programs, technical jobs and skills, and equipment are suggested to assist those institutions contemplating the development of technical training. (MHR)

O'Connor, K

1979-10-01T23:59:59.000Z

156

President Obama Establishes a Task Force on Climate  

NLE Websites -- All DOE Office Websites (Extended Search)

to strengthen their resilience to extreme weather and prepare for other impacts of climate change. An Executive Order to Protect Our Communities Preparing America for...

157

STUDENT MENTAL HEALTH AND WELL-BEING TASK FORCE REPORT  

E-Print Network (OSTI)

to end their own lives (M. Ohayon, personal communication, August 2008). #12;9 Evidence of changing they would] ask how I'm doing, I'd tell them. But other people don't tell their parents, [they] keep, they don't realize it's curved, and most of the class got C's [and they] think I'm doing a really bad job

Prinz, Friedrich B.

158

Before the Internet Policy Task Force ) ) In the Matter of ) ) ...  

Science Conference Proceedings (OSTI)

... competitions, apprentice programs, and internships can be bolstered with greater senior level commitment and funding. ...

2010-10-04T23:59:59.000Z

159

Before the Internet Policy Task Force ) ) In the Matter of ) ) ...  

Science Conference Proceedings (OSTI)

... the country, concerted training efforts such as cyber challenge competitions, apprentice programs, and internships can ...

2010-10-04T23:59:59.000Z

160

Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to many of the region's industries that directly support economic progress and job creation, including tourism and recreation, seafood production and sales, energy production...

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Microsoft Word - Data Center Metrics Task Force Recommendations...  

NLE Websites -- All DOE Office Websites (Extended Search)

Figure 4: Data center with electric and natural gas (Co-generation) purchase * Cogeneration Input Fuel Assumption o This taskforce has adopted the assumption that 67% of a...

162

Accelerator R and D task force presentation - m white  

NLE Websites -- All DOE Office Websites (Extended Search)

American competitiveness. The Committee directs the Department to submit a 10-year strategic plan by June 1, 2012 for accelerator technology research and development to advance...

163

Beryllium Health and Safety Committee Data Reporting Task Force  

Science Conference Proceedings (OSTI)

On December 8, 1999, the Department of Energy (DOE) published Title 10 CFR 850 (hereafter referred to as the Rule) to establish a chronic beryllium disease prevention program (CBDPP) to: {sm_bullet} reduce the number of workers currently exposed to beryllium in the course of their work at DOE facilities managed by DOE or its contractors, {sm_bullet} minimize the levels of, and potential for, expos exposure to beryllium, and {sm_bullet} establish medical surveillance requirements to ensure early detection of the disease.

MacQueen, D H

2007-02-21T23:59:59.000Z

164

About Fermilab | Fermilab and the Community | ILC Citizens' Task Force |  

NLE Websites -- All DOE Office Websites (Extended Search)

2007 Meeting Calendar and Topics 2007 Meeting Calendar and Topics January 27, 2007 - Retreat and Tour March 1, 2007 - Particle Physics Overview of Particle Physics and Fermilab's contribution Introduction of Meeting Calendar March 27, 2007 - The ILC Introduction to the ILC May 1, 2007 - The Global Design Effort Conversation with GDE Director Barry Barish May 22, 2007 - Property Rights and Locating the ILC at Fermilab Understanding legal implications of property rights Identify criteria for siting Best orientations for the tunnel June 26, 2007 - Environmental Issues Managing potential environmental impacts of the ILC July 24, 2007 - Construction-Related Issues Timing Safety Mitigating impacts September 25, 2007 - Surface Structures Facility sizes and needs Aesthetic issues Features that could be included to benefit communities

165

Definition: Forced Outage | Open Energy Information  

Open Energy Info (EERE)

Forced Outage Forced Outage Jump to: navigation, search Dictionary.png Forced Outage The removal from service availability of a generating unit, transmission line, or other facility for emergency reasons., The condition in which the equipment is unavailable due to unanticipated failure.[1] Related Terms transmission lines, transmission line References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Forced_Outage&oldid=480310" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties About us Disclaimers Energy blogs Linked Data

166

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

167

Regulations for Electric Transmission and Fuel Gas Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long...

168

DOE Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop November 1, 2012 Federal Energy Regulatory Commission Commissioner Cheryl LaFleur 1 FERC's Transmission Efforts Reliability and Grid Security Planning...

169

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Usage Transmission Transmission Once electricity is generated -- whether by burning fossil fuels; through nuclear fission; or by harnessing wind, solar, geothermal, or hydro...

170

Merchant transmission investment  

E-Print Network (OSTI)

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

171

Automated task allocation  

Science Conference Proceedings (OSTI)

The goal of the paradigm shift in Air Traffic Management (ATM) is to increase its overall performance by means of redesigning processes, evolving to a more automated, autonomous and predictable system. Nevertheless, when dealing with automation, it is ... Keywords: ATM, anticipatory, autonomous, centric, compensatory, decision support tools, level of automation, operations research, optimisation, performance metrics, task allocation

Rocío Barragán Montes, Eduardo García, Francisco Javier Sáez Nieto

2013-05-01T23:59:59.000Z

172

Format for Generic Task Description  

Science Conference Proceedings (OSTI)

Task: Submitting Proposals. Containing Scenario: Fast Tracking a Battery Standard Description: Review of the proposed ...

173

Independent transmission company (ITC) and markets for transmission  

E-Print Network (OSTI)

Independent Abstract-- transmission company (ITC) and markets for transmission Yong T. Yoon Marija a fundamental structure for the transmission provider (TP) composed of the independent transmission company (ITC out the associated functions including managing transmission congestion. At the minimum

Ilic, Marija D.

174

Three essays concerning information transmission  

E-Print Network (OSTI)

Transmissionas an Information-Transmission Mechanism,” American EconomicConcerning Information Transmission A dissertation submitted

Boone, Johnathan

2010-01-01T23:59:59.000Z

175

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

176

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

177

Elastic actuator for precise force control  

DOE Patents (OSTI)

The invention provides an elastic actuator consisting of a motor and a motor drive transmission connected at an output of the motor. An elastic element is connected in series with the motor drive transmission, and this elastic element is positioned to alone support the full weight of any load connected at an output of the actuator. A single force transducer is positioned at a point between a mount for the motor and an output of the actuator. This force transducer generates a force signal, based on deflection of the elastic element, that indicates force applied by the elastic element to an output of the actuator. An active feedback force control loop is connected between the force transducer and the motor for controlling the motor. This motor control is based on the force signal to deflect the elastic element an amount that produces a desired actuator output force. The produced output force is substantially independent of load motion. The invention also provides a torsional spring consisting of a flexible structure having at least three flat sections each connected integrally with and extending radially from a central section. Each flat section extends axially along the central section from a distal end of the central section to a proximal end of the central section.

Pratt, Gill A. (Lexington, MA); Williamson, Matthew M. (Boston, MA)

1997-07-22T23:59:59.000Z

178

Transmission outage data collection for multiple related outage events  

SciTech Connect

This paper focuses on the information required to provide a basis for the analysis of forced multiple outage events. It recaps research as well as the bulk transmission outage collection up-rate that was performed. This paper identifies trends and addresses their impact on bulk transmission outage data collection.

Lauby, M.G. (Electric Power Research Inst., Palo Alto, CA (USA)); Maillant, G.R. (Electricite de France (EDF)

1989-01-01T23:59:59.000Z

179

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

180

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Arnold Schwarzenegger TRANSMISSION BENEFIT  

E-Print Network (OSTI)

California Edison's (SCE) initial Tehachapi transmission trunk-line proposal for integration of wind. The Tehachapi Transmission Project to integrate 4,500 MW of renewable wind energy has since been approved after

182

NREL: Transmission Grid Integration - Data and Resources  

NLE Websites -- All DOE Office Websites (Extended Search)

Data and Resources Data and Resources NREL offers the following transmission integration-related data and resources. Eastern Wind Dataset A key task of the Eastern Wind Integration and Transmission Study was to develop a dataset of three years of modeled time series wind speed and power. This dataset was designed to help energy professionals perform wind integration studies, compare potential wind sites spatially and temporally, and estimate power production from hypothetical wind plants. Western Wind Dataset A primary task of the Western Wind and Solar Integration Study was to produce a comprehensive dataset that could be used to model the build-out of potential wind plants in the Western United States. This dataset was designed to help energy professionals perform wind integration studies,

183

Transmission Investment Incentives  

Science Conference Proceedings (OSTI)

This report documents the use of agent-based simulation as a tool for studying transmission investment incentives, and it is meant to illuminate what accounts for the difficulties in aligning incentives for enhancing the transmission system. The report suggests that a new method of calculation for bid optimization be applied to the economic analysis of long-term incentives for transmission investment. This technology can be broadly applied to help negotiators in transmission planning quantify their count...

2006-12-21T23:59:59.000Z

184

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

cable transmission systems:5 two 500 kV circuits, a high-voltage direct current (HVDC) system and two to serve VI and the HVDC link is expected to be completely retired in 2007. This erosion in transmission / replacement of the HVDC cables (at a cost of $230 million), as well as transmission upgrades on the mainland

185

What is Force  

Science Conference Proceedings (OSTI)

... force may be balanced by an opposing force so that no energy is expended ... The unit of force is the Newton (N). By definition, the newton is the force ...

2011-10-03T23:59:59.000Z

186

Automated manual transmission controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

187

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

188

Strategic Out-Tasking: Creating "win-win" outsourcing partnerships  

Science Conference Proceedings (OSTI)

IT outsourcing is one of the most prevalent trends in business today. Yet traditional outsourcing models force tradeoffs by both the enterprise and its outsourcer. The former often compromise operational flexibility and innovation while the latter price ... Keywords: Contracts, IT, Out-Tasking, Outsourcers, Outsourcing, Partnerships, Services, Strategic

Karthik Krishnamurthy; David Jegen; Bill Brownell

2009-01-01T23:59:59.000Z

189

Definition: Transmission Service Provider | Open Energy Information  

Open Energy Info (EERE)

Transmission Service Provider The entity that administers the transmission tariff and provides Transmission Service to Transmission Customers under applicable...

190

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications 2013 Transmission Reliability Program Peer Review - Day 1...

191

Task analysis for solar installers  

SciTech Connect

The process focused on the sequential identification and field validation of the tasks actually performed. This method provides an accurate picture of what happens on the roof. Forty-six solar firms were identified as the population; 29 (63%) participated in the validation project. We identified 8 duty areas and 46 tasks. The overall response rate for the occupational task list is 100% except for tasks under the duty of constructing solar collectors. Only eight of the twenty-nine respondents (28%) indicated that solar installers fabricate collectors. This shows that solar installers do not manufacture collectors and only perform tasks directly related to installation. Additional findings from our study indicate that instructional materials designed for solar installers need to be standardized and made task-specific. The tasks identified in this research should form the foundation for a competency-based curriculum for solar water heater installers.

Harrison, J.; LaHart, D.

1982-01-01T23:59:59.000Z

192

Cell-ECM traction force modulates endogenous tension at cellcell contacts  

E-Print Network (OSTI)

and resisting ex- ternal forces, it is becoming increasingly evident that cell-ECM and cell­cell adhesions are also sites of transmission of active, cell-generated forces (4). The nature of force balance across regulate cell shape and migration (1, 4, 5). In turn, force-mediated integrin signaling also controls cell

Schwarz, Ulrich

193

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

194

Video Transmission Jerkiness Measure.  

E-Print Network (OSTI)

??Digital video transmission is widely used nowadays in multimedia. Frame dropping, freeze and reduced number of frames in the transmitted video are common symptoms of… (more)

Abdelsamad, Deena

2013-01-01T23:59:59.000Z

195

NIST Transmission SEM  

Science Conference Proceedings (OSTI)

... As a result, more electrons will scatter, to provide the ... RR Keller, "Transmission EBSD in the Scanning Electron Microscope," Microscopy Today vol. ...

2013-07-29T23:59:59.000Z

196

Patterns of transmission investment  

E-Print Network (OSTI)

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

197

The progressive transmission disadvantage  

Science Conference Proceedings (OSTI)

The disadvantage of progressive transmission, compared to transmission in a single step, is analyzed for the high-rate case using a polytope that is self-similar under binary subdivision. This disadvantage is calculated to be 0.3424 dB or 0.057 bit compared ...

M. J. Durst

1997-01-01T23:59:59.000Z

198

FOR ELECTRIC POWER TRANSMISSION  

E-Print Network (OSTI)

A contract network extends the concept of a contract path to address the problem of loop flow and congestion in electric power transmission systems. A contract network option provides a well defined, internally consistent framework for assigning long-term capacity rights to a complicated electric transmission network. The contract network respects the special conditions induced by Kirchoff's Laws; accommodates thermal, voltage and contingency constraints on transmission capacity; and can be adopted without disturbing existing methods for achieving an economic power dispatch subject to these constraints. By design, a contract network would maintain short-run efficiency through optimal spot price determination of transmission prices. Through payment of congestion rentals, the contract network makes a long-term capacityright holder indifferent between delivery of the power or receipt of payments in a settlement system. And the contract network framework can support allocation of transmission capacity rights through a competitive bidding process. CONTRACT NETWORKS

William W. Hogan; William W. Hogan

1990-01-01T23:59:59.000Z

199

Interior Reflections of a Periodically Forced Equatorial Kelvin Wave  

Science Conference Proceedings (OSTI)

A fully three-dimensional, wind-forced equatorial model is used to study the effects of the strong near- surface equatorial pycnocline on energy transmission into the deep ocean. The equatorial Kelvin waves forced by a patch of zonal wind ...

Lewis M. Rothstein; Dennis W. Moore; Julian P. McCreary

1985-07-01T23:59:59.000Z

200

A combination of heuristic and bacteria foraging-differential evolution algorithm for transmission network expansion planning with security constraints  

Science Conference Proceedings (OSTI)

Transmission network expansion planning (TNEP) is an important component of power system planning. Its task is to determine the optimal set of transmission lines to be constructed such that the cost of expansion plan is minimum and no network constraints ... Keywords: Transmission expansion planning, compensation approach, hybrid method

Ashu Verma; P. R. Bijwe; B. K. Panigrahi

2010-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

202

Probabilistic Approach to Quantifying the Contribution of Variable Generation and Transmission to System Reliability: Preprint  

SciTech Connect

The increasing electrical load served by variable generation (VG), such as wind and solar energy, in the United States and many other countries has stimulated an interesting line of research to better quantify the capacity value of these resources. Methods applied traditionally to thermal units based on their average outage rates do not apply to VG because of their uncertain and non-dispatchable nature. The North American Electric Reliability Corporation's Integration of Variable Generation Task Force recently released a report that highlighted the need to develop and benchmark underlying loss-of-load expectation and related metrics that reasonably and fairly calculate the contribution to planning reserves, or capacity value, of solar and wind power. As the fraction of generation coming from VG becomes more significant, their estimated capacity value will have a larger impact on system planning. In this paper, we provide a method to include VG in traditional probabilistic-based adequacy methods. This method has been implemented in the Renewable Energy Probabilistic Resource Assessment tool developed at the National Renewable Energy Laboratory. Through an example based on the U.S. Western Interconnection, this method is applied to assess the effect that transmission can have on resource adequacy. We also analyze the interactions between available transmission and capacity value for VG.

Ibanez, E.; Milligan, M.

2012-09-01T23:59:59.000Z

203

Probabilistic Approach to Quantifying the Contribution of Variable Generation and Transmission to System Reliability: Preprint  

DOE Green Energy (OSTI)

The increasing electrical load served by variable generation (VG), such as wind and solar energy, in the United States and many other countries has stimulated an interesting line of research to better quantify the capacity value of these resources. Methods applied traditionally to thermal units based on their average outage rates do not apply to VG because of their uncertain and non-dispatchable nature. The North American Electric Reliability Corporation's Integration of Variable Generation Task Force recently released a report that highlighted the need to develop and benchmark underlying loss-of-load expectation and related metrics that reasonably and fairly calculate the contribution to planning reserves, or capacity value, of solar and wind power. As the fraction of generation coming from VG becomes more significant, their estimated capacity value will have a larger impact on system planning. In this paper, we provide a method to include VG in traditional probabilistic-based adequacy methods. This method has been implemented in the Renewable Energy Probabilistic Resource Assessment tool developed at the National Renewable Energy Laboratory. Through an example based on the U.S. Western Interconnection, this method is applied to assess the effect that transmission can have on resource adequacy. We also analyze the interactions between available transmission and capacity value for VG.

Ibanez, E.; Milligan, M.

2012-09-01T23:59:59.000Z

204

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

205

Down hole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

206

Designing electricity transmission auctions  

E-Print Network (OSTI)

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

207

Downhole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2008-01-15T23:59:59.000Z

208

Transmission Electron Microscopy (TEM)  

Science Conference Proceedings (OSTI)

...Transmission electron microcopy (TEM) has been used since the 1950s to obtain very high resolution images of microstructures. As TEMs were enhanced to include features such as digitally scanned point beams and energy dispersive x-ray detectors

209

Cloud Transmissivities for Canada  

Science Conference Proceedings (OSTI)

Transmissivities are determined for different cloud types using nine years of hourly irradiance measurements under overcast skies at six Canadian stations. Values for individual stations and for pooled data using irradiances uncorrected for ...

J. A. Davies; M. Abdel-Wahab; J. E. Howard

1985-03-01T23:59:59.000Z

210

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

211

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

212

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

213

Security tasks are highly interdependent.  

E-Print Network (OSTI)

Motivation Security tasks are highly interdependent. To improve security tools, we need to understand how security practitioners collaborate in their organizations. Security practitioners in context Exchange of Information Develop security tools that: · Integrate information from different communication

214

Definition: Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Jump to: navigation, search Dictionary.png Transmission An interconnected group of lines and associated equipment for the movement or transfer of electric energy...

215

Interconnection Transmission Planning: Awards | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and...

216

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

ColoradoTransmissionAgencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary...

217

Electricity Transmission, A Primer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

218

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

219

Forced Trench Waves  

Science Conference Proceedings (OSTI)

A general theory for forced barotropic long trench waves in the presence of linear bottom friction is presented. Two specific forcing mechanisms are considered: (i) transverse fluctuations in a western boundary current as it flows across a trench,...

Lawrence A. Mysak; Andrew J. Willmott

1981-11-01T23:59:59.000Z

220

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

SERVOMECHANISMS WITH FORCE FEEDBACK  

SciTech Connect

A class of linear proportional servomechanisms is examined in which an electrical signal proportional to output force is used to improve performance. The effect of this "force feedback" on a positional servomechanism is analyzed as well as the effect on a special type of servomechanism which reflects load forces back to the input. This latter type of servomechanism is called "force reflecting." Laboratory models of these servormechanisms were designed and constructed, and experimental data are presented in support of the analysis. (auth)

Arzbaecher, R.C.

1960-05-01T23:59:59.000Z

222

Calibrated Atomic Force Microscopy  

Science Conference Proceedings (OSTI)

... Vorburger, SL Tan, NG Orji, J. Fu, “Interlaboratory Comparison of Traceable Atomic Force Microscope Pitch Measurements,” SPIE Proceedings Vol. ...

2011-10-28T23:59:59.000Z

223

Electric Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

224

Merchant Transmission Investment  

E-Print Network (OSTI)

merchant transmission model of the type described above, though Australia has adopted a mixed merchant and regu- 6 lated transmission model.3 However, recent academic proposals,4 as well as FERC’s July 2002 Standard Market Design (SMD) proposals, call... that a nodal or locational marginal pricing (LMP) system is in place with attributes similar to those being proposed by the U.S. Federal Energy Regulatory Commission (FERC) in its SMD proposals and to what is in operation in New 3Two merchant lines...

Joskow, Paul; Tirole, Jean

2004-06-16T23:59:59.000Z

225

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

226

On the use of satellite-based estimates of rainfall temporal distribution to simulate the potential for malaria transmission in rural Africa  

E-Print Network (OSTI)

[1] This paper describes the use of satellite-based estimates of rainfall to force the Hydrology, Entomology and Malaria Transmission Simulator (HYDREMATS), a hydrology-based mechanistic model of malaria transmission. We ...

Yamana, Teresa K.

227

The Pilot Study R&D Task  

Science Conference Proceedings (OSTI)

The Pilot Study R&D Task. EDT – a complex of four tasks: 1) Detection of Entities – limited to five types: PER ORG GPE ...

228

NREL: Energy Analysis: Transmission Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

229

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

230

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

231

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission lines between two adjacent periodic intersections to be longer than the other. 5 figs.

Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; deGrassie, J.S.

1990-03-02T23:59:59.000Z

232

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

1993-01-01T23:59:59.000Z

233

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

234

Transmission SEAB Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

235

Transmission planning in China  

Science Conference Proceedings (OSTI)

Though China is well along in restructuring its power markets, it still has some way to travel before economic considerations receive adequate weight in transmission planning decisions. Adoption of more sophisticated tools such as multi-agent modeling will help China continue in its progress in achieving this. (author)

Dong, Jun; Zhang, Jing

2009-07-15T23:59:59.000Z

236

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

237

Omega Transmission Lines  

E-Print Network (OSTI)

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

238

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

involves the construction of an approximate 1000 mile HVAC and HVDC transmission project from British ACSR. (Northern Segment) b) A 3000 MVA, 500 kV HVAC to +/-500 kV HVDC Converter at the NEO Station. c) A +/-500 kV HVDC line from the NEO Station to the proposed Collinsville Substation in the San Francisco Bay

239

LAP Transmission Rate  

NLE Websites -- All DOE Office Websites (Extended Search)

LAP Transmission Rate 4.50 4.00 3.82 3.50 3.00 of 2.50 c 0 2.I2 2.68 I 3: 2.00 1.50 1.00 0.50 0.00 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012...

240

Transmission Services J7000  

NLE Websites -- All DOE Office Websites (Extended Search)

C T D E S E R T S O U T H W E S T R E G I O N R O C K Y M O U N T A I N R E G I O N Transmission Services J7000 Ensuring the Reliability of the Bulk Electric System Western's...

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

Kotlyar, O.M.

1997-03-25T23:59:59.000Z

242

Transmission Enhancement Technology Report  

E-Print Network (OSTI)

to increase transmission capability. Section 3 documents existing technologies used in the industry today the traditional types of design alternatives used by Western and the electric industry. The primary system operate at three times the ampacity of Aluminum Conductor Steel Reinforced (ACSR) conductor and has a much

243

A Survey of National Transmission Grid Modeling Capabilities at DOE  

E-Print Network (OSTI)

. Outages can be predicted, but only in steady state. They expect to have dynamic capabilities in about.g., generator outages, transmission outages, unexpected load variations). The simulation continues when;ramp up/down rates;startup time;shutdown time; minimum down time;forced outage rate; maintenance

Howle, Victoria E.

244

Case Study - Hill Air Force Base, Utah | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hill Air Force Base, Utah Hill Air Force Base, Utah Case Study - Hill Air Force Base, Utah October 7, 2013 - 2:00pm Addthis Overview Energy savings performance contracting at Hill Air Force Base generated much interest during a recent training session on energy management that downlinked 12 Department of Defense sites. Energy systems in 940 buildings on the Base will be upgraded under an 18-year ESPC between the Government and the energy service company, CES/Way. Improvements are distributed over five task orders that will be completed in five years, with CES/Way providing $2.5 million in up-front costs for the first two task orders. Utah Power & Light will provide $8 million in rebates to help cover the contractor's initial investment, maintenance services, and interest costs.

245

Low cost Image Transmission System  

SciTech Connect

Throughout the Department of Energy (DOE) complex, sites protect themselves with intrusion detection systems. Some of these systems have sensors in remote areas. These sensors frequently alarm -- not because they have detected a terrorist skulking around the area, but because they have detected a horse, or a dog, or a bush moving in the breeze. Even though the local security force is 99% sure there is no real threat, they must assess each of these nuisance or false alarms. Generally, the procedure consists of dispatching an inspector to drive to the area and make an assessment. This is expensive in terms of manpower and the assessment is not timely. Often, by the time the inspector arrives, the cause of the alarm has vanished. A television camera placed to view the area protected by the sensor could be used to help in this assessment, but this requires the installation of high-quality cable, optical fiber, or a microwave link. Further, to be of use at the present time, the site must have had the foresight to have installed these facilities in the past and have them ready for use now. What is needed is a device to place between the television camera and a modem connecting to a low-bandwidth channel such as radio or a telephone line. This paper discusses the development of such a device: an Image Transmission System, or ITS.

Skogmo, D.

1994-06-01T23:59:59.000Z

246

A software measurement task ontology  

Science Conference Proceedings (OSTI)

Software measurement is a key process for software project management and software process improvement. There are several process quality models and measurement standards that point out its importance and present good practices for it. Unfortunately, ... Keywords: semantic interoperability, software measurement, task ontology

Monalessa Perini Barcellos; Ricardo de Almeida Falbo

2013-03-01T23:59:59.000Z

247

FAQS Job Task Analyses- Chemical Processing  

Energy.gov (U.S. Department of Energy (DOE))

FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

248

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

249

Transmission Developers Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

250

Transmission Siting_071508.indd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

251

A Smarter Transmission Grid  

Science Conference Proceedings (OSTI)

Our modern transmission grid transports bulk power over long distances and across many provincial boundaries, but ever-increasing energy demands are significantly transforming it. Worldwide, many catalysts are driving this transformation, including emerging supply- and demand-side technologies, cyber security concerns, and aging infrastructures, to name just a few. As the grid transforms and more grid-connected renewable resources complicate reliability, it will be increasingly difficult to meet its futu...

2010-12-31T23:59:59.000Z

252

Transmission Price Risk Management  

Science Conference Proceedings (OSTI)

This report is concerned with the financial risks that arise from the uncertain price of transmission service in restructured or competitive electricity markets. These risks are most severe in markets with locational pricing (LMP), but they also exist in more traditionally organized electricity markets. This report has two main purposes. The first is to review the existing mathematical models of electricity price formation in spot and forward markets that may be helpful as the foundations for developing ...

2006-12-04T23:59:59.000Z

253

Green Transmission Efficiency Initiative  

Science Conference Proceedings (OSTI)

As a consequence of escalating interest in the environment and climate changea national focus on energy efficiency, and growing electricity demandthe time is right to assess energy efficiency from both an end-use perspective as well as across the utility value chain, from generation, to transmission, to distribution. The reduction of our carbon footprint and increasing the role of renewable energy are an important part of the strategy for the greening for electric energy supply. As a result, efficient po...

2009-07-31T23:59:59.000Z

254

Computational Modeling and Assessment of Nanocoatings for Ultrasupercritcal Boilers – Task 4: Fireside Corrosion Testing  

Science Conference Proceedings (OSTI)

Fireside corrosion of boiler waterwalls continues to be the number one issue resulting in forced outages and boiler unavailability for conventional coal-fired fossil power plants. Future plants, operating at ultrasupercritical steam conditions, will be subject to even higher temperatures, which might accelerate fireside corrosion in waterwall and superheater/reheater components. This report documents the initial testing for the fourth task of a six-task projectjointly sponsored by the Electric Power Rese...

2010-05-20T23:59:59.000Z

255

Conductive Channel for Energy Transmission  

SciTech Connect

For many years the attempts to create conductive channels of big length were taken in order to study the upper atmosphere and to settle special tasks, related to energy transmission. There upon the program of creation of 'Impulsar' represents a great interest, as this program in a combination with high-voltage high repetition rate electrical source can be useful to solve the above mentioned problems (N. Tesla ideas for the days of high power lasers). The principle of conductive channel production can be shortly described as follows. The 'Impulsar' - laser jet engine vehicle - propulsion take place under the influence of powerful high repetition rate pulse-periodic laser radiation. In the experiments the CO{sub 2}-laser and solid state Nd:YAG laser systems had been used. Active impulse appears thanks to air breakdown (<30 km) or to the breakdown of ablated material on the board (>30 km), placed in the vicinity of the focusing mirror-acceptor of the breakdown waves. With each pulse of powerful laser the device rises up, leaving a bright and dense trace of products with high degree of ionization and metallization by conductive nano-particles due to ablation. Conductive dust plasma properties investigation in our experiments was produced by two very effective approaches: high power laser controlled ablation and by explosion of wire. Experimental and theoretical results of conductive canal modeling will be presented. The estimations show that with already experimentally demonstrated figures of specific thrust impulse the lower layers of the Ionosphere can be reached in several ten seconds that is enough to keep the high level of channel conductivity and stability with the help of high repetition rate high voltage generator. Some possible applications for new technology are highlighted.

Apollonov, Victor V. [A.M. Prokhorov General Physics Institute, Vavilov Str. 38, Moscow, 119991 (Russian Federation)

2011-11-10T23:59:59.000Z

256

Why measure force?  

Science Conference Proceedings (OSTI)

... Automated industrial processes such as rolling mills require accurate force measurement to control roll pressure on bar steel, sheet metal, paper ...

2011-10-03T23:59:59.000Z

257

NUCLEAR PROXIMITY FORCES  

E-Print Network (OSTI)

One might summarize of nuclear potential energy has beendegree of freedom) for the nuclear interaction between anyUniversity of California. Nuclear Proximity Forces 'I< at

Randrup, J.

2011-01-01T23:59:59.000Z

258

Electricity Transmission and Distribution Technologies ...  

Electricity Transmission and Distribution Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research ...

259

WestConnect Transmission Product  

NLE Websites -- All DOE Office Websites (Extended Search)

WestConnect Transmission Product Federal Register Notices Customer Notifications Customer Comments Approved Rate Order FERC Confirmation...

260

Transmission eigenvalues for elliptic operators  

E-Print Network (OSTI)

A reduction of the transmission eigenvalue problem for multiplicative sign-definite perturbations of elliptic operators with constant coefficients to an eigenvalue problem for a non-selfadjoint compact operator is given. Sufficient conditions for the existence of transmission eigenvalues and completeness of generalized eigenstates for the transmission eigenvalue problem are derived. In the trace class case, the generic existence of transmission eigenvalues is established.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

2010-07-03T23:59:59.000Z

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Transmission Planning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to...

262

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theMontana-Alberta Tie 230 kV Transmission Line: TransmissionNorthern California Transmission Line Project, Technical

Mills, Andrew D.

2009-01-01T23:59:59.000Z

263

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

B. Kirby. 2001. Transmission Planning for a Restructuringindustry_issues/energy_infrastructure/transmission/transmission_hirst.pdf Joskow, P.L. 2005a. “Transmission

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

264

FAQS Job Task Analyses - Nuclear Safety Specialist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

JOB / TASK ANALYSIS for JOB / TASK ANALYSIS for Nuclear Safety Specialist (NSS) Functional Area Qualification Standard (FAQS) DOE-STD-1183-2007 Instructions for Step 1: Step 1 Identify and evaluate tasks - Develop a comprehensive list of tasks that define the job. o A great starting point is the list of Duties and Responsibilities from the FAQS. o Give careful thought to additional tasks that could be considered. o Don't worry about deleting tasks at this point - that is a part of the process further down. - List the tasks (and their sources, e.g., Duties and Responsibilities #1) in the chart below. - Discuss each task as a group and come to a consensus pertaining to Importance and Frequency of the task (i.e., each team member can consent to the assigned value, even

265

Power electronics in electric utilities: HVDC power transmission systems  

SciTech Connect

High Voltage Direct Current (HVDC) power transmission systems constitute an important application of power electronics technology. This paper reviews salient aspects of this growing industry. The paper summarizes the history of HVDC transmission and discusses the economic and technical reasons responsible for development of HVDC systems. The paper also describes terminal design and basic configurations of HVDC systems, as well as major equipments of HVDC transmission system. In this regard, the state-of-the-art technology in the equipments constructions are discussed. Finally, the paper reviews future developments in the HVDC transmission systems, including promising technologies, such as multiterminal configurations, Gate Turn-Off (GTO) devices, forced commutation converters, and new advances in control electronics.

Nozari, F.; Patel, H.S.

1988-04-01T23:59:59.000Z

266

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

267

Bulk Power Transmission Study  

E-Print Network (OSTI)

"Texans now have a choice. We can become more efficient and maintain our standard of living, or we can continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled, the extensive natural gas pipeline network moved energy easily within the state. In recent years two things have changed: 1. Electric utilities have made extensive investment in lignite, coal, and nuclear plants and, 2. Improvements in gas turbine technology and the removal of institutional barriers has encouraged cogeneration at many of our energy intensive process industries. This energy diversity means that there are now significant differences in energy costs between units. The variable costs of generation of power can vary between units by a ratio of 2 or 3 to 1 and this difference will be accentuated when energy costs rise (and they will; it’s a question of when, not if). The potential for costs savings by optional dispatching of the entire interconnected system are greater than ever before as demonstrated by the PUC's Bulk Power Transmission Study. And the potential can be enhanced with added transmission system investment. Cogeneration and small power production has proven to be the most cost effective way for Texas to add additional generating capacity needed to supply an economy that is starting to rebound and to replace old, obsolete power plants. The freedom to locate these facilities at the fuel source or at the site of large thermal demand makes real economic and environmental sense. The use of renewable or waste fuels allows something that would otherwise be wasted to contribute to our economy. Fossil fuels that are displaced can be redirected to another use or consumed for future benefit. By integrating a gas turbine generator with a. process plant, the natural gas required for producing electricity can be reduced by 40% below that required for a combined cycle. The heat rejected from a gas turbine, combined cycle, or steam plant can be redirected to a process use that contributes to our economy by producing something of value to world markets. By contrast a conventional power plant is paid for by the rate payers and consumes Texas natural resources and therefore is a burden rather than an enhancement to our economy. The optimal location of facilities are possible only if there is an adequate transmission system. Utility, consumer and industry must cooperate to improve our transmission system for the benefit of all Texas. The Texas Public Utilities Commission has taken the lead in promoting efficiency by requiring transmission wheeling between qualifying facilities and electric utilities. Several cogeneration facilities have been constructed as a result. In order to encourage small power production, the rule needs to be expanded to include projects interconnected with distribution systems. Most renewable resource projects are relatively small and cannot afford the cost of a high voltage interconnect, and yet their characteristics match a baseload need. The ability to wheel power to a utility that needs base load power from a distribution level interconnection is essential to development of these smaller projects."

John, T.

1988-09-01T23:59:59.000Z

268

NREL: Transmission Grid Integration - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

269

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

270

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications Proceedings of the March 25-26, 2009 Conference for the...

271

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

stability  analysis of transmission and distribution Voltage Recovery, NERC Transmission Issues  Subcommitte Air Conditioner Response to Transmission Faults. ” ,” IEEE 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

272

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

differences: models for transmission property rights,” IEEEto solve power transmission network design problems,” IEEES. A. "Network topologies and transmission investment under

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

273

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

Georgia Transmission Corp Place Georgia Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission Yes...

274

Definition: Transmission Customer | Open Energy Information  

Open Energy Info (EERE)

Load-Serving Entity, or Purchasing-Selling Entity.1 Related Terms transmission service, transmission lines, transmission line References Glossary of Terms Used in Reliability...

275

Definition: Transmission Owner | Open Energy Information  

Open Energy Info (EERE)

facilities.1 Related Terms Transmission Operatortransmission lines, transmission line, transmission lines References Glossary of Terms Used in Reliability Standards An in...

276

A PRECISION ANALOG FIBER OPTIC TRANSMISSION SYSTEM  

E-Print Network (OSTI)

Optical Fibers for Transmission, John Wiley and Sons, 9.Laboratories, Transmission Systems for Communications, BellANALOG FIBER OPTIC TRANSMISSION SYSTEM G. Stover M.S. Thesis

Stover, G.

2010-01-01T23:59:59.000Z

277

Automated manual transmission clutch controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

1999-11-30T23:59:59.000Z

278

Transmission Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

279

FAQS Job Task Analyses - Construction Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

80-2004: Construction Management Functional Area Qualification Standard 80-2004: Construction Management Functional Area Qualification Standard 1 Conducting the Job / Task Analysis DOE-STD-1180-2004: Construction Management Functional Area Qualification Standard Step 1: Identify and evaluate tasks * Develop a comprehensive list of tasks that define the job. o A great starting point is the list of Duties and Responsibilities from the FAQS. o Give careful thought to additional tasks that could be considered. o Don't worry about deleting tasks at this point - that is a part of the process further down. * List the tasks (and their sources, e.g., Duties and Responsibilities #1) in the chart below. * Discuss each task as a group and come to a consensus pertaining to Importance and Frequency of the task (i.e., each team

280

FAQS Job Task Analyses - Environmental Compliance FAQS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Compliance Functional Area Qualification Standard Environmental Compliance Functional Area Qualification Standard DOE-STD-1156-2011 Step 1 Identify and evaluate tasks - Develop a comprehensive list of tasks that define the job. o A great starting point is the list of Duties and Responsibilities from the FAQS. o Give careful thought to additional tasks that could be considered. o Don't worry about deleting tasks at this point - that is a part of the process further down. - List the tasks (and their sources, e.g., Duties and Responsibilities #1) in the chart below. - Discuss each task as a group and come to a consensus pertaining to Importance and Frequency of the task (i.e., each team member can consent to the assigned value, even if they don't exactly agree with it). - When all values have been assigned, consider as a group deleting tasks

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

FAQS Job Task Analyses - Safeguards and Security  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-STD-1171 DOE-STD-1171 Safeguards and Security FAQ Step 1 Identify and evaluate tasks - Develop a comprehensive list of tasks that define the job. o A great starting point is the list of Duties and Responsibilities from the FAQS. o Give careful thought to additional tasks that could be considered. o Don't worry about deleting tasks at this point - that is a part of the process further down. - List the tasks (and their sources, e.g., Duties and Responsibilities #1) in the chart below. - Discuss each task as a group and come to a consensus pertaining to Importance and Frequency of the task (i.e., each team member can consent to the assigned value, even if they don't exactly agree with it). - When all values have been assigned, consider as a group deleting tasks that receive

282

Potential contributions of noncontact atomic force microscopy for the future Casimir force measurements  

E-Print Network (OSTI)

Surface electric noise, i.e., the non-uniform distribution of charges and potentials on a surface, poses a great experimental challenge in modern precision force measurements. Such a challenge is encountered in a number of different experimental circumstances. The scientists employing atomic force microscopy (AFM) have long focused their efforts to understand the surface-related noise issues via variants of AFM techniques, such as Kelvin probe force microscopy or electric force microscopy. Recently, the physicists investigating quantum vacuum fluctuation phenomena between two closely-spaced objects have also begun to collect experimental evidence indicating a presence of surface effects neglected in their previous analyses. It now appears that the two seemingly disparate science communities are encountering effects rooted in the same surface phenomena. In this report, we suggest specific experimental tasks to be performed in the near future that are crucial not only for fostering needed collaborations between the two communities, but also for providing valuable data on the surface effects in order to draw the most realistic conclusion about the actual contribution of the Casimir force (or van der Waals force) between a pair of real materials.

W. J. Kim; U. D. Schwarz

2010-10-18T23:59:59.000Z

283

Nondestructive Testing of Overhead Transmission Lines: Numerical and Experimental Investigation  

E-Print Network (OSTI)

Overhead transmission lines are periodically inspected using both on-ground and helicopter-aided visual inspection. Factors including sun glare, cloud cover, close proximity to power lines and the rapidly changing visual circumstances make airborne inspection of power lines a particularly hazardous task. In this research, a finite element model is developed that can be used to create the theoretical dispersion curves of an overhead transmission line. The complex geometry of the overhead transmission line is the primary reason for absence of a theoretical solution to get the analytical dispersion curves. The numerical results are then verified with experimental tests using a non-contact and broadband laser detection technique. The methodology developed in this study can be further extended to a continuous monitoring system and be applied to other cable monitoring applications, such as bridge cable monitoring, which would otherwise put human inspectors at risk.

Kulkarni, Salil Subhash

2009-12-01T23:59:59.000Z

284

An overview of task order 10  

DOE Green Energy (OSTI)

Task Order 10 formalizes a collaboration in high explosive pulsed power (HEPP) experiments between LANL and VNIIEF. The focus is the VNIIEF disk explosive magnetic generator (DEMG) technology. The task order outlines a sequence of tasks and deliverables culminating in an experiment which takes place in the US utilizing US explosives and a Russian DEMG. This talk summarizes task order 10. It gives a brief history and present status in terms of the proposed high pressure EOS experiment (ALT-3).

Rousculp, Christopher L [Los Alamos National Laboratory

2011-01-12T23:59:59.000Z

285

NREL Job Task Analysis: Crew Leader  

Science Conference Proceedings (OSTI)

A summary of job task analyses for the position of crew leader when conducting weatherization work on a residence.

Kurnik, C.; Woodley, C.

2011-05-01T23:59:59.000Z

286

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network (OSTI)

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

287

A novel algorithm for dynamic task scheduling  

Science Conference Proceedings (OSTI)

This paper deals with the problem of dynamic task scheduling in grid environment of multi-processors. First, this paper formulates task scheduling as an optimization problem and then optimizes with a novel hybrid optimization algorithm. The proposed ... Keywords: Bacteria foraging optimization, Genetic algorithms, Grid computing, Task scheduling

Sasmita Kumari Nayak; Sasmita Kumari Padhy; Siba Prasada Panigrahi

2012-05-01T23:59:59.000Z

288

Middleware support for many-task computing  

Science Conference Proceedings (OSTI)

Many-task computing aims to bridge the gap between two computing paradigms, high throughput computing and high performance computing. Many-task computing denotes high-performance computations comprising multiple distinct activities, coupled via file ... Keywords: Computing, Data-intensive distributed computing, Falkon, High-performance computing, High-throughput, Loosely-coupled applications, Many-task computing, Petascale, Swift

Ioan Raicu; Ian Foster; Mike Wilde; Zhao Zhang; Kamil Iskra; Peter Beckman; Yong Zhao; Alex Szalay; Alok Choudhary; Philip Little; Christopher Moretti; Amitabh Chaudhary; Douglas Thain

2010-09-01T23:59:59.000Z

289

Constraint and Restoring Force  

E-Print Network (OSTI)

Long-lived sensor network applications must be able to self-repair and adapt to changing demands. We introduce a new approach for doing so: Constraint and Restoring Force. CRF is a physics-inspired framework for computing ...

Beal, Jacob

2007-08-24T23:59:59.000Z

290

Optical Bernoulli forces  

E-Print Network (OSTI)

By Bernoulli's law, an increase in the relative speed of a fluid around a body is accompanied by a decrease in the pressure. Therefore, a rotating body in a fluid stream experiences a force perpendicular to the motion of ...

Movassagh, Ramis

291

Reduction-in-Force  

Energy.gov (U.S. Department of Energy (DOE))

Reduction in force (RIF) is a set of regulations and procedures that are used to determine whether an employee keeps his or her present position, or whether the employee has a right to another...

292

NEXT\tCALL 2013\tProposal\tCall\t#1 TASK\tPLAN TASK\tPLAN TASK\tENDS...  

NLE Websites -- All DOE Office Websites (Extended Search)

NEXT CALL 2013 Proposal Call 1 TASK PLAN TASK PLAN TASK ENDS CYCLE TIME CYCLE TIME CYCLE TIME CYCLE TIME ACTUAL CURRENT SUBMISSIONS TASKS (START DATE) (END DATE) (ACTUAL DATE)...

293

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest...

294

Weak nuclear forces cause the strong nuclear force  

E-Print Network (OSTI)

We determine the strength of the weak nuclear force which holds the lattices of the elementary particles together. We also determine the strength of the strong nuclear force which emanates from the sides of the nuclear lattices. The strong force is the sum of the unsaturated weak forces at the surface of the nuclear lattices. The strong force is then about ten to the power of 6 times stronger than the weak force between two lattice points.

E. L. Koschmieder

2007-12-11T23:59:59.000Z

295

Environmental research on a modified in situ oil shale task process. Progress report  

DOE Green Energy (OSTI)

This report summarizes the progress of the US Department of Energy's Oil Shale Task Force in its research program at the Occidental Oil Shale, Inc. facility at Logan Wash, Colorado. More specifically, the Task Force obtained samples from Retort 3E and Retort 6 and submitted these samples to a variety of analyses. The samples collected included: crude oil (Retort 6); light oil (Retort 6); product water (Retort 6); boiler blowdown (Retort 6); makeup water (Retort 6); mine sump water; groundwater; water from Retorts 1 through 5; retort gas (Retort 6); mine air; mine dust; and spent shale core (Retort 3E). The locations of the sampling points and methods used for collection and storage are discussed in Chapter 2 (Characterization). These samples were then distributed to the various laboratories and universities participating in the Task Force. For convenience in organizing the data, it is useful to group the work into three categories: Characterization, Leaching, and Health Effects. While many samples still have not been analyzed and much of the data remains to be interpreted, there are some preliminary conclusions the Task Force feels will be helpful in defining future needs and establishing priorities. It is important to note that drilling agents other than water were used in the recovery of the core from Retort 3E. These agents have been analyzed (see Table 12 in Chapter 2) for several constituents of interest. As a result some of the analyses of this core sample and leachates must be considered tentative.

Not Available

1980-05-01T23:59:59.000Z

296

Kentucky Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

EPRI, in conjunction with Georgia Transmission Corporation (GTC) and Photo Science, Inc. (PSI), developed a standardized methodology for siting overhead electric transmission lines. EPRI report 1013080, EPRI-GTC Overhead Electric Transmission Line Siting Methodology, published February 2006, provides additional information. This methodology has been applied in Georgia and currently is being applied to projects in Kentucky by East Kentucky Power Cooperative and E.ON U.S. on behalf of Louisville Gas and El...

2007-12-18T23:59:59.000Z

297

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(including regional diversity, AC-DC transmission and distribution solutions, microgrids, energy storage, and centralized-decentralized control) * Accommodates two-way flows...

298

NREL: Transmission Grid Integration - Webmaster  

NLE Websites -- All DOE Office Websites (Extended Search)

reply. Your name: Your email address: Your message: Send Message Printable Version Transmission Grid Integration Home Issues Projects Research Staff Working with Us Publications...

299

NREL: Transmission Grid Integration - Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Generation Integration Study Oahu Wind Integration and Transmission SIND Toolkit Electricity Market Design Energy Imbalance Markets Flexible Energy Scheduling Tool for...

300

FAQS Job Task Analyses - Deactivation and Decommissioning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Functional Area Qualification Standard Functional Area Qualification Standard Deactivation & Decommissioning (D&D) DOE-STD-1166-2003 Step 1 Identify and evaluate tasks - Develop a comprehensive list of tasks that define the job. o A great starting point is the list of Duties and Responsibilities from the FAQS. o Give careful thought to additional tasks that could be considered. o Don't worry about deleting tasks at this point - that is a part of the process further down. - List the tasks (and their sources, e.g., Duties and Responsibilities #1) in the chart below. - Discuss each task as a group and come to a consensus pertaining to Importance and Frequency of the task (i.e., each team member can consent to the assigned value, even if they don't exactly agree with it).

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

The interior transmission problem and bounds on transmission eigenvalues  

E-Print Network (OSTI)

We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

2010-09-28T23:59:59.000Z

302

The interior transmission problem and bounds on transmission eigenvalues  

E-Print Network (OSTI)

We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

Hitrik, Michael; Ola, Petri; Päivärinta, Lassi

2010-01-01T23:59:59.000Z

303

Joint Outreach Task Group Former Workers Screening Program |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Outreach Task Group Former Workers Screening Program Joint Outreach Task Group Former Workers Screening Program The Joint Outreach Task Group (JOTG) includes representatives...

304

Employee Job Task Analysis (EJTA) PIA, Richland Operations Office...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland...

305

Chapter 4 Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

306

EC Transmission Line Materials  

SciTech Connect

The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

Bigelow, Tim S [ORNL

2012-05-01T23:59:59.000Z

307

Duke Energy's Transmission Roadmap Initiative  

Science Conference Proceedings (OSTI)

Duke Energy's Transmission Roadmap Initiative advances a vision for development of a power delivery communications and automation infrastructure. The initiative describes performance of a communications upgrade to substations, implementation of select technologies and applications, and integration of enterprise applications, databases, and systems. This report provides a comprehensive view of Duke's Transmission Roadmap Initiative, with a complete technology assessment, infrastructure overview, and discu...

2009-09-18T23:59:59.000Z

308

Semiclassical transmission across transition states  

E-Print Network (OSTI)

It is shown that the probability of quantum-mechanical transmission across a phase space bottleneck can be compactly approximated using an operator derived from a complex Poincar\\'e return map. This result uniformly incorporates tunnelling effects with classically-allowed transmission and generalises a result previously derived for a classically small region of phase space.

Stephen C. Creagh

2005-06-01T23:59:59.000Z

309

Work Force Restructuring Activities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Force Restructuring Activities Force Restructuring Activities December 10, 2008 Note: Current updates are in bold # Planned Site/Contractor HQ Approved Separations Status General * LM has finalized the compilation of contractor management team separation data for the end of FY07 actuals and end of FY08 and FY09 projections. LM has submitted to Congress the FY 2007 Annual Report on contractor work force restructuring activities. The report has been posted to the LM website. *LM conducted a DOE complex-wide data call to the Field and Operations offices for DOE Contractor Management teams to provide, by program, actual contractor separation data for the end of FY 2008 and projections for the end of FY 2009 and FY 2010. The data will be used to keep senior management informed of upcoming large WFR actions.

310

Radiative Forcing of Climate Change  

SciTech Connect

Chapter 6 of the IPCC Third Assessment Report Climate Change 2001: The Scientific Basis. Sections include: Executive Summary 6.1 Radiative Forcing 6.2 Forcing-Response Relationship 6.3 Well-Mixed Greenhouse Gases 6.4 Stratospheric Ozone 6.5 Radiative Forcing By Tropospheric Ozone 6.6 Indirect Forcings due to Chemistry 6.7 The Direct Radiative Forcing of Tropospheric Aerosols 6.8 The Indirect Radiative Forcing of Tropospheric Aerosols 6.9 Stratospheric Aerosols 6.10 Land-use Change (Surface Albedo Effect) 6.11 Solar Forcing of Climate 6.12 Global Warming Potentials hydrocarbons 6.13 Global Mean Radiative Forcings 6.14 The Geographical Distribution of the Radiative Forcings 6.15 Time Evolution of Radiative Forcings Appendix 6.1 Elements of Radiative Forcing Concept References.

Ramaswamy, V.; Boucher, Olivier; Haigh, J.; Hauglustaine, D.; Haywood, J.; Myhre, G.; Nakajima, Takahito; Shi, Guangyu; Solomon, S.; Betts, Robert E.; Charlson, R.; Chuang, C. C.; Daniel, J. S.; Del Genio, Anthony D.; Feichter, J.; Fuglestvedt, J.; Forster, P. M.; Ghan, Steven J.; Jones, A.; Kiehl, J. T.; Koch, D.; Land, C.; Lean, J.; Lohmann, Ulrike; Minschwaner, K.; Penner, Joyce E.; Roberts, D. L.; Rodhe, H.; Roelofs, G.-J.; Rotstayn, Leon D.; Schneider, T. L.; Schumann, U.; Schwartz, Stephen E.; Schwartzkopf, M. D.; Shine, K. P.; Smith, Steven J.; Stevenson, D. S.; Stordal, F.; Tegen, I.; van Dorland, R.; Zhang, Y.; Srinivasan, J.; Joos, Fortunat

2001-10-01T23:59:59.000Z

311

Transmission Reliability | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

312

ITC Transmission | Open Energy Information  

Open Energy Info (EERE)

ITC Transmission ITC Transmission Jump to: navigation, search Name ITC Transmission Place Michigan Utility Id 56068 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=ITC_Transmission&oldid=410858" Categories: EIA Utility Companies and Aliases Utility

313

PROPOSAL FOR CONTINGENT TRANSMISSION PLANS  

E-Print Network (OSTI)

How should the WECC’s RTEP process develop a 10-year transmission plan based upon transmission studies completed over the past several years? This paper explores the notion of a “plan ” that consists of a package containing a small number of “contingent plans ” that would correspond to a limited number of future states of the world by 2020. The rationale for developing transmission plans on a contingent basis is based on the following observations. Contingencies. Insights from TEPPC transmission planning over the past several years indicate that the demand for future transmission expansion in the West is contingent upon a number of important drivers including: (1) Levels of state renewable portfolio standards (RPS); (2) Development of remote versus local renewable generation; (3) Load growth given DSM policies and economic growth; (4) Policies to reduce greenhouse gas (GHG) emissions; (5) Shifts of innovation and cost competitiveness between wind and solar energy; (6) Advances in distributed generation technologies;

unknown authors

2010-01-01T23:59:59.000Z

314

Regional Transmission Projects: Finding Solutions  

Science Conference Proceedings (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

315

Energy Transmission and Infrastructure  

SciTech Connect

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

316

FAQS Job Task Analyses - Facility Representative  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Job/Task Analysis Job/Task Analysis Importance Scale Frequency Scale Competency Need Timeframe 0 Not Performed or N/A 3 Important 0 Not Performed 3 Every few days to weekly 1 On first day 4 After 1st 6 months 1 Not Important 4 Very Important 1 Every few months to yearly 4 Every few hours to daily 2 Within first 3 months 5 Prior to Qualification 2 Somewhat Important 5 Extremely Important 2 Every few weeks to monthly 5 Hourly to many times each hour 3 Within first 4-6 months 1 CONDUCTING THE JOB / TASK ANALYSIS Step 1 Identify and evaluate tasks - Develop a comprehensive list of tasks that define the job. o A great starting point is the list of Duties and Responsibilities from the FAQS. o Give careful thought to additional tasks that could be considered.

317

Design studies for the transmission simulator method of experimental dynamic substructuring.  

SciTech Connect

In recent years, a successful method for generating experimental dynamic substructures has been developed using an instrumented fixture, the transmission simulator. The transmission simulator method solves many of the problems associated with experimental substructuring. These solutions effectively address: (1) rotation and moment estimation at connection points; (2) providing substructure Ritz vectors that adequately span the connection motion space; and (3) adequately addressing multiple and continuous attachment locations. However, the transmission simulator method may fail if the transmission simulator is poorly designed. Four areas of the design addressed here are: (1) designating response sensor locations; (2) designating force input locations; (3) physical design of the transmission simulator; and (4) modal test design. In addition to the transmission simulator design investigations, a review of the theory with an example problem is presented.

Mayes, Randall Lee; Arviso, Michael

2010-05-01T23:59:59.000Z

318

NWCC Transmission Case Study III  

DOE Green Energy (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

319

The Cost of Transmission for Wind Energy: A Review of Transmission...  

NLE Websites -- All DOE Office Websites (Extended Search)

Wind Energy: A Review of Transmission Planning Studies Title The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies Publication Type Report Year of...

320

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

low unit transmission costs, there were still numerous studies with high transmission voltages that had much higher unit costs than studies with transmission lines

Mills, Andrew D.

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theand Preference in Transmission Service. ” Washington, D.C. :Integrating Wind into Transmission Planning: The Rocky

Mills, Andrew D.

2009-01-01T23:59:59.000Z

322

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

such as major transmission lines or large generators, areto the nearest bulk transmission line is the only dedicatedon constrained transmission lines (or conversely, pay

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

323

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

transmission cost barrier for wind energy. A secondary goalfocus on the cost of transmission for wind energy does notincremental cost of transmission for wind energy implied by

Mills, Andrew D.

2009-01-01T23:59:59.000Z

324

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

Transmission Planning and Wind Energy. Issue Brief. August.of new transmission for wind energy due to the complex andincreasingly including wind energy in transmission plans. We

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

325

Joint Outreach Task Group Calendar: September 2013  

Energy.gov (U.S. Department of Energy (DOE))

Joint Outreach Task Group (JOTG)has created a monthly calendar of community events to facilitate interagency and community involvement in these events. September 2013

326

ACE R&D Task Definition Plans  

Science Conference Proceedings (OSTI)

ACE R&D Task Definition Plans. EDT+. Redefine/Add entity types; Add tracking across documents; Add (and normalize) attributes. ...

327

NREL Job Task Analysis: Quality Control Inspector  

SciTech Connect

A summary of job task analyses for the position of quality control inspector when evaluating weatherization work that has been done on a residence.

Kurnik, C.; Woodley, C.

2011-05-01T23:59:59.000Z

328

TREC 2007 Legal Track: Main Task Glossary  

Science Conference Proceedings (OSTI)

TREC 2007 Legal Track: Main Task Glossary. Revision History. 2007 Oct 2: st: first draft. qrelsL07.normal. The qrelsL07.normal ...

329

NREL Job Task Analysis: Energy Auditor  

SciTech Connect

A summary of job task analyses for the position of energy auditor when evaluating a residence before and during weatherization work.

Kurnik, C.; Woodley, C.

2011-05-01T23:59:59.000Z

330

AGSD Task 3.5 Test Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

CMC Bench Scale Material Test Plan TOPICAL REPORT Reporting Period Start Date: February 1, 2006 End Date: May 30, 2006 Principal Authors Mark Fitzsimmons Task Development Lead...

331

SunShot Initiative: Transmission Grid Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Grid Integration to Transmission Grid Integration to someone by E-mail Share SunShot Initiative: Transmission Grid Integration on Facebook Tweet about SunShot Initiative: Transmission Grid Integration on Twitter Bookmark SunShot Initiative: Transmission Grid Integration on Google Bookmark SunShot Initiative: Transmission Grid Integration on Delicious Rank SunShot Initiative: Transmission Grid Integration on Digg Find More places to share SunShot Initiative: Transmission Grid Integration on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards

332

Midwest Transmission Workshop I Summary  

SciTech Connect

OAK-B135 The meeting was opened with a review of the purposes of the workshop: (1) Present and discuss key studies and assessments of transmission upgrades, additions and related issues for the upper Midwest, including work that addresses the full range of views on these topics; (2) Understand the various transmission issues in the upper Midwest and discuss options for addressing the issues; and (3) Identify the decision makers and entities that need to play an active role if transmission issues are to be resolved, and agree on next steps for engaging these individuals and organizations through education, outreach, and information dissemination.

Kevin Bryan

2001-05-01T23:59:59.000Z

333

Electrical transmission line diametrical retainer  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

334

Neural-network-based fault location estimator for transmission line protection  

Science Conference Proceedings (OSTI)

A classical task in the protection of transmission lines against short circuits is the estimation of the electrical distance to the fault and its comparison against a given threshold to determine whether the line is faulted or not. This paper presents ...

Héctor J. Altuve; Oscar L. Chacón; Ernesto Vázquez; Daniel Posadas; Edgar N. Sánchez

1999-04-01T23:59:59.000Z

335

CERTS 2012 Program Review - NASPI Leadership and Task Team Technical Support - Joe Gracia, ORNL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ORNL's Support of NASPI ORNL's Support of NASPI Presented at: DOE OE Transmission Reliability Program Review ORNL Team: Jose R. Gracia, P.E. (Presenter) D. Tom Rizy Isabelle Snyder, Ph.D. 12 June 2012 2 Managed by UT-Battelle for the U.S. Department of Energy OE Transmission Reliability Program Review NASPI Goal: To improve the reliable operation of the North American power system by successfully transitioning synchrophasor technologies from research to industry adoption. 2 Project Objective(s) ORNL's activities in support of NASPI include: * Participate in NASPI Leadership Team * Support Operations Implementation Task Team * Participate in Performance and Standards Task Team * Develop needed metrology capabilities in partnership with NIST.

336

Wireless Sensor Network for Electric Transmission Line Monitoring  

SciTech Connect

Generally, federal agencies tasked to oversee power grid reliability are dependent on data from grid infrastructure owners and operators in order to obtain a basic level of situational awareness. Since there are many owners and operators involved in the day-to-day functioning of the power grid, the task of accessing, aggregating and analyzing grid information from these sources is not a trivial one. Seemingly basic tasks such as synchronizing data timestamps between many different data providers and sources can be difficult as evidenced during the post-event analysis of the August 2003 blackout. In this project we investigate the efficacy and cost effectiveness of deploying a network of wireless power line monitoring devices as a method of independently monitoring key parts of the power grid as a complement to the data which is currently available to federal agencies from grid system operators. Such a network is modeled on proprietary power line monitoring technologies and networks invented, developed and deployed by Genscape, a Louisville, Kentucky based real-time energy information provider. Genscape measures transmission line power flow using measurements of electromagnetic fields under overhead high voltage transmission power lines in the United States and Europe. Opportunities for optimization of the commercial power line monitoring technology were investigated in this project to enable lower power consumption, lower cost and improvements to measurement methodologies. These optimizations were performed in order to better enable the use of wireless transmission line monitors in large network deployments (perhaps covering several thousand power lines) for federal situational awareness needs. Power consumption and cost reduction were addressed by developing a power line monitor using a low power, low cost wireless telemetry platform known as the ''Mote''. Motes were first developed as smart sensor nodes in wireless mesh networking applications. On such a platform, it has been demonstrated in this project that wireless monitoring units can effectively deliver real-time transmission line power flow information for less than $500 per monitor. The data delivered by such a monitor has during the course of the project been integrated with a national grid situational awareness visualization platform developed by Oak Ridge National Laboratory. Novel vibration energy scavenging methods based on piezoelectric cantilevers were also developed as a proposed method to power such monitors, with a goal of further cost reduction and large-scale deployment. Scavenging methods developed during the project resulted in 50% greater power output than conventional cantilever-based vibrational energy scavenging devices typically used to power smart sensor nodes. Lastly, enhanced and new methods for electromagnetic field sensing using multi-axis magnetometers and infrared reflectometry were investigated for potential monitoring applications in situations with a high density of power lines or high levels of background 60 Hz noise in order to isolate power lines of interest from other power lines in close proximity. The goal of this project was to investigate and demonstrate the feasibility of using small form factor, highly optimized, low cost, low power, non-contact, wireless electric transmission line monitors for delivery of real-time, independent power line monitoring for the US power grid. The project was divided into three main types of activity as follows; (1) Research into expanding the range of applications for non-contact power line monitoring to enable large scale low cost sensor network deployments (Tasks 1, 2); (2) Optimization of individual sensor hardware components to reduce size, cost and power consumption and testing in a pilot field study (Tasks 3,5); and (3) Demonstration of the feasibility of using the data from the network of power line monitors via a range of custom developed alerting and data visualization applications to deliver real-time information to federal agencies and others tasked with grid reliability (Tasks 6,8)

Alphenaar, Bruce

2009-06-30T23:59:59.000Z

337

Transmission Planning | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

338

National Electric Transmission Congestion Studies  

Energy.gov (U.S. Department of Energy (DOE))

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission...

339

Scanning/Transmission Electron Microscopes  

NLE Websites -- All DOE Office Websites (Extended Search)

ScanningTransmission Electron Microscopes Nion UltraSTEM 60-100 dedicated aberration-corrected STEM for low- to mid-voltage operation and Enfina EELS Contact: Juan-Carlos Idrobo,...

340

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

The objective of this project is to reduce capital cost by extending life expectancy of overhead transmission wood structures through inspection and assessment procedures and through aging mitigation techniques and tools.

2005-11-29T23:59:59.000Z

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Accounting-related transmission issues  

Science Conference Proceedings (OSTI)

Various initiatives have been undertaken by the Federal Energy Regulatory Commission (FERC) to deregulate wholesale electric energy markets. These initiatives have focused on restructuring the transmission systems in the US and recently have culminated in a proposal requiring formation of and participation in regional transmission organizations. The overall form of regulation selected to determine rates for transmission entities as well as underlying regulatory decisions reached on key issues will have profound implications for transmission entities. For example, traditional cost-based regulation would require one set of accounting and reporting rules, while incentive-based regulation may not be subject to those same rules. An overview of some of the major accounting and financial reporting issues that will need to be considered is presented.

Niehaus, M.; Bjorn, P.; Pate, G.

1999-12-01T23:59:59.000Z

342

Modeling the mental differentiation task with EEG  

Science Conference Proceedings (OSTI)

Differentiation in human beings is the act of perceiving the difference in or between objects. In other words, it is the mental process taking place to discriminate one thing from others, a common task performed by a person on a very regular basis. Making ... Keywords: BCI, EEG, artifical neural network, biosignal processing, differencitation tasks

Tan Vo; Tom Gedeon; Dat Tran

2012-11-01T23:59:59.000Z

343

Development of superconducting transmission cable. CRADA final report  

SciTech Connect

The purpose of this Cooperative Research and Development Agreement (CRADA) between Oak Ridge National Laboratory (ORNL) and Southwire Company is to develop the technology necessary to proceed to commercialization of high-temperature superconducting (HTS) transmission cables. Power transmission cables are a promising near-term electric utility application for high-temperature superconductivity. Present HTS wires match the needs for a three-phase transmission cable: (1) the wires must conduct high currents in self-field, (2) there are no high forces developed, and (3) the cables may operate at relatively low current density. The commercially-available HTS wires, in 100-m lengths, make construction of a full three-phase, alternating current (ac) transmission cable possible. If completed through the pre-commercialization phase, this project will result in a new capability for electric power companies. The superconducting cable will enable delivery with greater efficiency, higher power density, and lower costs than many alternatives now on the market. Job creation in the US is expected as US manufacturers supply transmission cables to the expanding markets in Asia and to the densely populated European cities where pipe-type cable is prevalent. Finally, superconducting cables may enable delivery of the new, diverse and distributed sources of electricity that will constitute the majority of new installed electrical generation in the world during the coming decades.

Hawsey, R.; Stovall, J.P. [Oak Ridge National Lab., TN (United States); Hughey, R.L.; Sinha, U.K. [Southwire Co., Carrollton, GA (United States)

1997-10-01T23:59:59.000Z

344

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

Transmission and distribution infrastructures throughout the world are aging. As such, inspection, assessment, and maintenance of existing facilities have become increasingly important topics. This valuable reference provides an in-depth look at all facets of an inspection, assessment, and maintenance program for transmission line wood structures to help utilities develop and refine individual maintenance programs. The report is part of a broader multi-year effort by EPRI to develop a comprehensive handb...

2006-09-28T23:59:59.000Z

345

Transmission Structure Foundation Design Guide  

Science Conference Proceedings (OSTI)

This guide contains the most current and comprehensive information for the design of foundations for overhead line structures. The guide covers the complete transmission structure foundation design process from the subsurface investigations and design of the foundations, to the construction and inspection of the foundation. Reference documents to assist transmission structure foundation designers in the development of specifications such as for subsurface investigations and foundation construction ...

2012-11-28T23:59:59.000Z

346

Transmission Valuation and Cost Recovery  

Science Conference Proceedings (OSTI)

This technical update provides information on the status of the electric power industry regarding the economic valuation of transmission projects. Such valuations became critical with the introduction of economic transmission projects in the context of competitive electricity markets. Economic valuation is also becoming increasingly important for traditional reliability upgrades, because of the need for consistency in cost allocations between the two types of upgrades. The year 2005 has brought significa...

2005-12-22T23:59:59.000Z

347

Force Modulator System  

SciTech Connect

Many metal parts manufacturers use large metal presses to shape sheet metal into finished products like car body parts, jet wing and fuselage surfaces, etc. These metal presses take sheet metal and - with enormous force - reshape the metal into a fully formed part in a manner of seconds. Although highly efficient, the forces involved in forming metal parts also damage the press itself, limit the metals used in part production, slow press operations and, when not properly controlled, cause the manufacture of large volumes of defective metal parts. To date, the metal-forming industry has not been able to develop a metal-holding technology that allows full control of press forces during the part forming process. This is of particular importance in the automotive lightweighting efforts under way in the US automotive manufacturing marketplace. Metalforming Controls Technology Inc. (MC2) has developed a patented press control system called the Force Modulator that has the ability to control these press forces, allowing a breakthrough in stamping process control. The technology includes a series of hydraulic cylinders that provide controlled tonnage at all points in the forming process. At the same time, the unique cylinder design allows for the generation of very high levels of clamping forces (very high tonnages) in very small spaces; a requirement for forming medium and large panels out of HSS and AHSS. Successful production application of these systems testing at multiple stamping operations - including Ford and Chrysler - has validated the capabilities and economic benefits of the system. Although this technology has been adopted in a number of stamping operations, one of the primary barriers to faster adoption and application of this technology in HSS projects is system cost. The cost issue has surfaced because the systems currently in use are built for each individual die as a custom application, thus driving higher tooling costs. This project proposed to better marry the die-specific Force Modulator technology with stamping presses in the form of a press cushion. This system would be designed to operate the binder ring for multiple parts, thus cutting the per-die cost of the technology. This study reports the results of technology field application. This project produced the following conclusions: (1) The Force Modulator system is capable of operating at very high tempos in the stamping environment; (2) The company can generate substantial, controlled holding tonnage (binder ring pressure) necessary to hold high strength steel parts for proper formation during draw operations; (3) A single system can be designed to operate with a family of parts, thus significantly reducing the per-die cost of a FM system; (4) High strength steel parts made with these systems appear to show significant quality improvements; (5) The amounts of steel required to make these parts is typically less than the amounts required with traditional blank-holding technologies; and (6) This technology will aid in the use of higher strength steels in auto and truck production, thus reducing weight and improving fuel efficiency.

Redmond Clark

2009-04-30T23:59:59.000Z

348

ARMY SERVICE FORCES  

Office of Legacy Management (LM)

ARMY SERVICE FORCES ARMY SERVICE FORCES ' -, 1 MANHATTAN ENGINEER DISTRICT --t 4 IN "LPLI RC,' LR io EIDM CIS INTELLIGENCE AND SECURITY DIVISION CHICAGO BRANCH OFFICE i ., -,* - P. 0. Box 6770-A I ' 1 .' CHICAGO 80. ILLINOIS /lvb 15 February 1945 Subject: shipment Security Survey at &Uinckrodt Chemical Works. MEMORANDUM to the Officer in Charge. 1. The Mallinckrodt Chemical Works, St. Louis, Missouri, was contacted by the undersigned on 16 November 1944, for the purpose of -king an investigation to determine security provided shipments of interest to the Manhattan Engineer District. The investigation in- cluded shipments of vital materials originating with the Mallinckrodt Company and those received by them. Particular attention has been given to the future production and shipment schedules of these materials.

349

FAQS Job Task Analyses - Technical Training  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Training FAQS Technical Training FAQS August 2010 STEP 1: Job Task Analysis for Tasks Task (and Number) Source Importance Frequency (1) Collaborate with the DOE-wide training community to analyze, design, develop, implement, evaluate, and share required courses and programs that have application beyond the local organization. FAQS Duties and Responsibilities Paragraph 6 3 1 (2) Design and develop training curriculum and/or courses using methods suitable for the target audience, including technology- supported learning when appropriate and cost effective. FAQS Duties and Responsibilities Paragraph 7 4 2 (3) Conduct training sessions and formal presentations. FAQS Duties and Responsibilities Paragraph 8 2 2 Importance Scale Frequency How important is this task to the job? How often is the task performed?

350

FAQS Job Task Analyses - Fire Protection Engineering  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Job Task Analysis and Competency Review Job Task Analysis and Competency Review for All Level Competencies Fire Protection Engineering FAQS Initially conducted (expert competencies): August 2010 Updated (includes ALL Competencies): April 2011 Updated (includes ALL Competencies): October 2012 STEP 1: Job Task Analysis for Tasks Task (and Number) Source Importance Frequency Serve as the subject matter expert in the area of fire protection, life safety, and fire department emergency related services. FAQS Duties and Responsibilities Paragraph A 5 4 Review fire hazard analyses, assessments, and other fire safety documentation for compliance with applicable requirements. FAQS Duties and Responsibilities Paragraph B 5 3 Evaluate the adequacy of site emergency services. This includes all facets of the fire

351

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

case study of U.S. transmission line siting,” Energy Policy,Dual variable on transmission line k’s power flownetwork branches (transmission lines), it is possible to

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

352

Ultra-Long-Haul WDM transmission systems  

Science Conference Proceedings (OSTI)

This paper discusses the key transmission issues and design considerations for ultra-long-haul WDM systems. The key enabling technologies for the current generation of ultra-long-haul WDM transmission are described. Noise analysis and transmission modelling ...

Y. R. Zhou; A. Lord; S. R. Sikora

2002-10-01T23:59:59.000Z

353

Quantum Theory of Transmission Line Resonator-Assisted Cooling of a Micromechanical Resonator  

E-Print Network (OSTI)

We propose a quantum description of the cooling of a micromechanical flexural oscillator by a one-dimensional transmission line resonator via a force that resembles cavity radiation pressure. The mechanical oscillator is capacitively coupled to the central conductor of the transmission line resonator. At the optimal point, the micromechanical oscillator can be cooled near to the ground state and the cooling can be measured by homodyne detection of the output microwave signal.

Li, Yong; Xue, Fei; Bruder, C

2008-01-01T23:59:59.000Z

354

Quantum Theory of Transmission Line Resonator-Assisted Cooling of a Micromechanical Resonator  

E-Print Network (OSTI)

We propose a quantum description of the cooling of a micromechanical flexural oscillator by a one-dimensional transmission line resonator via a force that resembles cavity radiation pressure. The mechanical oscillator is capacitively coupled to the central conductor of the transmission line resonator. At the optimal point, the micromechanical oscillator can be cooled close to the ground state, and the cooling can be measured by homodyne detection of the output microwave signal.

Yong Li; Ying-Dan Wang; Fei Xue; C. Bruder

2008-04-30T23:59:59.000Z

355

Integrating Wind into Transmission Planning: The Rocky Mountain Area Transmission Study (RMATS): Preprint  

DOE Green Energy (OSTI)

Plans to expand the western grid are now underway. Bringing power from low-cost remote resources--including wind--to load centers could reduce costs for all consumers. But many paths appear to be already congested. Locational marginal price-based modeling is designed to identify the most cost-effective paths to be upgraded. The ranking of such paths is intended as the start of a process of political and regulatory approvals that are expected to result in the eventual construction of new and upgraded lines. This paper reviews the necessary data and analytical tasks to accurately represent wind in such modeling, and addresses some policy and regulatory issues that can help with wind integration into the grid. Providing wind fair access to the grid also (and more immediately) depends on tariff and regulatory changes. Expansion of the Rocky Mountain Area Transmission Study (RMATS) study scope to address operational issues supports the development of transmission solutions that enable wind to connect and deliver power in the next few years--much sooner than upgrades can be completed.

Hamilton, R.; Lehr, R.; Olsen, D.; Nielsen, J.; Acker, T.; Milligan, M.; Geller, H.

2004-03-01T23:59:59.000Z

356

Extruded Dielectrics for Transmission Cables: Evaluation of Aging Models  

Science Conference Proceedings (OSTI)

One of the tasks proposed at the 2002 EPRI workshop on the aging of extruded transmission cables was to evaluate three recently developed theoretical aging models of electrical insulation. The three models were (1) the Thermodynamic Model of Aging of Extruded Insulation by J.P. Crine; (2) the Space Charge Aging Model by L.A. Dissado, G. Mazzanti, and G.C. Montanari (DMM); and (3) the Electromechanical Aging Model by T.J. Lewis. These three models are considered to be significant improvements over the emp...

2003-12-31T23:59:59.000Z

357

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations March 6, 2008 - 11:54am Addthis...

358

DOE National Interest Electric Transmission Corridors Conference  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Interest Electric Transmission Corridors Conference March 29, 2006 Hilton Garden Hotel Chicago, IL William H. Whitehead General Manager, Transmission Strategy PJM...

359

Electricity Transmission Data Needs Focus Group Results  

U.S. Energy Information Administration (EIA)

power, transmission flows within states, the implications of transmission on capacity expansion decisions and costs; age of transformers and other facilities;

360

DOE Transmission Capacity Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Casablanca Carlos American Electric Power Transmission Owner  

E-Print Network (OSTI)

(Facilitator) Chantal PJM Interconnection Not Applicable Horstmann John Dayton Power & Light Company (The) Transmission Owner Issermoyer John PPL Electric Utilities Corp. dba PPL Utilities Transmission Owner

Pjm Interconnection Llc; Teleconference Webex Participants; Firstenergy Solutions; Corp Transmission Owner; Boltz Jeff; Firstenergy Solutions; Corp Transmission Owner; Fecho Thomas; Indiana Michigan; Power Company; Transmission Owner; Patten Kevin; Company Transmission Owner

2012-01-01T23:59:59.000Z

362

Electric generating or transmission facility: determination of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric generating or transmission facility: determination of rate-making principles and treatment: procedure (Kansas) Electric generating or transmission facility: determination...

363

Definition: Deferred Transmission Capacity Investments | Open...  

Open Energy Info (EERE)

transformers.1 Related Terms transmission lines, transformer, transmission line, sustainability References SmartGrid.gov 'Description of Benefits' An inl LikeLike UnlikeLike...

364

EIS-0285: Transmission System Vegetation Management Program ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission System Vegetation Management Program June 23, 2000 EIS-0285: EPA Notice of Availability of the Final Environmental Impact Statement Transmission System Vegetation...

365

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency...

366

Transmission/Photo Gallery | Open Energy Information  

Open Energy Info (EERE)

Gallery < Transmission Jump to: navigation, search PhotoGalleryHeader.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada...

367

American Transmission Systems Inc | Open Energy Information  

Open Energy Info (EERE)

American Transmission Systems Inc Place Ohio Utility Id 56162 Utility Location Yes Ownership T NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Transmission Yes References EIA...

368

Transmission/Permitting Atlas | Open Energy Information  

Open Energy Info (EERE)

Atlas < Transmission Jump to: navigation, search PermittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California...

369

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection...

370

NREL: Transmission Grid Integration - Eastern Renewable Generation...  

NLE Websites -- All DOE Office Websites (Extended Search)

transmission? How does geographic diversity of wind reduce wind integration costs? How do offshore and onshore wind power compare? What transmission is needed to facilitate higher...

371

Definition: Firm Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Definition No reegle definition available. Also Known As Firm services Related Terms transmission lines, electricity generation, transmission line, smart grid References ...

372

Definition: Transmission Reliability | Open Energy Information  

Open Energy Info (EERE)

to ensure reliable system operation as system conditions change.1 Related Terms transmission lines, transfer capability, system, transmission line References Glossary...

373

Definition: Transmission Reliability Margin | Open Energy Information  

Open Energy Info (EERE)

system operation as system conditions change.1 Related Terms transfer capability, transmission lines, system, transmission line References Glossary of Terms Used in...

374

Definition: Transmission Constraint | Open Energy Information  

Open Energy Info (EERE)

that may be reached during normal or contingency system operations.1 Related Terms transmission lines, system, contingency, transmission line, element References ...

375

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

which is a cooperating agency in the project. The proposed project would: Rebuild aging and deteriorating transmission lines Reduce the number of linear miles of transmission...

376

Michigan Electric Transmission Company | Open Energy Information  

Open Energy Info (EERE)

Transmission Company Jump to: navigation, search Name Michigan Electric Transmission Company Place Michigan Utility Id 56163 Utility Location Yes Ownership T NERC RFC Yes ISO MISO...

377

Electric Power Generation and Transmission (Iowa) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Generation and Transmission (Iowa) Electric Power Generation and Transmission (Iowa) < Back Eligibility Agricultural Industrial Investor-Owned Utility MunicipalPublic...

378

Microsoft Word - Data Center Metrics Task Force Recommendations V2 5-17-2011.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

Recommendations for Measuring and Reporting Overall Data Center Efficiency Version 2 - Measuring PUE for Data Centers 17 May 2011 Table of Contents 1 Introduction ............................................................................................................................................ 1 1.1 Purpose - Recommendations for Measuring and Publishing PUE at All Data Centers ... 1 1.2 Background - Guiding Principles for Data Center Efficiency Metrics ................................ 1 1.3 Scope of Recommendations ....................................................................................................... 2 2 Definitions ............................................................................................................................................... 2

379

Hydrothermal research and development assessment. Task Force report: projections for direct-heat applications  

DOE Green Energy (OSTI)

Low and moderate temperature hydrothermal resources suitable for direct-heat applications have been identified in 37 states. The extent to which three resources might be used over the next 20 years were evaluated and the probable impact of Federal programs on hydrothermal resource utilization was assessed. The use types that comprise the bulk of the market were determined. Representative firms and municipalities were interviewed to determine their willingness to use hydrothermal energy, and to determine the investment decision criteria that would influence their actions. (MHR)

Not Available

1982-04-01T23:59:59.000Z

380

The National Science Board (NSB) Task Force to Study Faculty Administrative Workload  

E-Print Network (OSTI)

decade two Federal Demonstration Partnership (FDP) Faculty Workload Surveys indicate that administrative FastLane and Research.gov Changes On March 18, 2013, the National Science Foundation (NSF) flipped

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

HLS OPPORTUNITIES FOR STUDENT PRACTICE FORECLOSURE TASK FORCE: PROJECT NO ONE LEAVES  

E-Print Network (OSTI)

of their second and third years at the law school. Students are primary case handlers in cases involving a broad in the following district courts: Brookline, Cambridge, Chelsea, Malden, and Quincy, as well as the Roxbury

Wolfe, Patrick J.

382

Chief financial officer's task force on rationing feasibility, cost and schedule. Final report  

Science Conference Proceedings (OSTI)

The purpose of this memorandum is to report our realistic assessment of the feasibility, cost, and time frame for bringing a rationing program to 90-day readiness. The basic aspects of the nature of the rationing plan are discussed. The plan has been changed in several respects in response to comments from the Congress, the general public and the ECC, since the previous version was rejected by the Congress in May 1979. Three changes in particular impact the preimplementation process: The range of entities accorded status as priority firms has increased to cover such groups as telecommunications firms and for-hire delivery firms; All firms (not just priority users) are alloted rights for a percentage of their historical gasoline usage; States have more influence on the division of the total state supply between state reserves and vehicle allotments. The rationing plan, is described on a chart depicting the interaction of the principal components is included. The rationing process starts when checks for coupons are sent to owners of registered vehicles. The biggest single problem area appears to be delivering these checks into the hands of the vehicle registrants who are entitled to them. (DMC)

Not Available

1980-03-05T23:59:59.000Z

383

Native American Support Programs Task Force Changing Winds: Service to Native American Students  

E-Print Network (OSTI)

in whitebark pine krummholz in the alpine treeline ecotone east of the Continental Divide on the Blackfeet; Divide Peak (48u679N, 113u389W), situated on the border of the Blackfeet Indian Reservation and Glacier increasingly wind-exposed farther away from the base of the actual peak. Locations east of the Continental

Maxwell, Bruce D.

384

Nanotechnology applications to desalination : a report for the joint water reuse & desalination task force.  

SciTech Connect

Nanomaterials and nanotechnology methods have been an integral part of international research over the past decade. Because many traditional water treatment technologies (e.g. membrane filtration, biofouling, scale inhibition, etc.) depend on nanoscale processes, it is reasonable to expect one outcome of nanotechnology research to be better, nano-engineered water treatment approaches. The most immediate, and possibly greatest, impact of nanotechnology on desalination methods will likely be the development of membranes engineered at the near-molecular level. Aquaporin proteins that channel water across cell membranes with very low energy inputs point to the potential for dramatically improved performance. Aquaporin-laced polymer membranes and aquaporin-mimicking carbon nanotubes and metal oxide membranes developed in the lab support this. A critical limitation to widespread use of nanoengineered desalination membranes will be their scalability to industrial fabrication processes. Subsequent, long-term improvements in nanoengineered membranes may result in self-healing membranes that ideally are (1) more resistant to biofouling, (2) have biocidal properties, and/or (3) selectively target trace contaminants.

Brady, Patrick Vane; Mayer, Tom; Cygan, Randall Timothy

2011-01-01T23:59:59.000Z

385

An Act to Implement the Recommendations of the Governor's Ocean Energy Task Force (Maine)  

Energy.gov (U.S. Department of Energy (DOE))

This law was enacted to overcome economic, technical and regulatory obstacles and to provide economic incentives for vigorous and efficient development of promising indigenous, renewable ocean...

386

West Valley Site History, Cleanup Status, and Role of the West Valley Citizen Task Force  

Energy.gov (U.S. Department of Energy (DOE))

Presentation made by Raymond C. Vaughan for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY. 

387

NDN, volume transmission, and self-organization in brain dynamics  

E-Print Network (OSTI)

NDN, VOLUME TRANSMISSION, AND SELF- ORGANIZATION IN BRAINThese systems instantiate volume transmission bynonsynaptic diffusion transmission, in concert with the

Freeman, Walter J III

2005-01-01T23:59:59.000Z

388

Definition: Non-Firm Transmission Service | Open Energy Information  

Open Energy Info (EERE)

available. Also Known As Interruptible Load or Interruptible Demand Related Terms transmission lines, electricity generation, transmission line, firm transmission service,...

389

FAQS Job Task Analyses - Industrial Hygiene  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industrial Hygiene FAQS Industrial Hygiene FAQS STEP 1: Job Task Analysis for Tasks Task (and Number) Source Importance Frequency (1) Plan, observe, and evaluate contractor performance involving industrial hygiene activities to ensure the adequacy and effectiveness of contractor programs such as: * Technical performance (e.g., adequacy of technical practices) * Plans, policies, and procedures * Management controls * Worker training and qualification programs * Occurrence reporting and corrective actions * Occupational health programs FAQS Duties and Responsibilities Paragraph C 4 5 (2) Develop, review, and assess industrial hygiene documentation. FAQS Duties and Responsibilities Paragraph D 4 5 (3) Resolve or facilitate the resolution of industrial hygiene issues.

390

FAQS Job Task Analyses - Instrument and Controls  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

or Working Level Competencies or Working Level Competencies DOE-STD-1162, Instrument & Controls Functional Area Qualification Standard (FAQS) September 2010 STEP 1: Job Task Analysis for Tasks associated with Instrument & Controls Task Source Importance Frequency One: Serve as a subject matter expert and technical resource for instrumentation and control systems. Inspect and evaluate instrumentation and control systems for safe and efficient operation, maintenance, and testing. DOE-STD-1162 Duties and Responsibilities Items B and C 3 2 Two: Review and assess authorization basis documentation. Evaluate instrumentation and control system conformity to authorization basis documentation and other design basis documents. Audit facility instrumentation and control

391

Task-Oriented Maximally Entangled States  

E-Print Network (OSTI)

We introduce the notion of a task-oriented maximally entangled state (TMES). This notion depends on the tasks for which a quantum state is used as the resource. This concept may be more fruitful than that of a general maximally entangled state in the case of a multipartite system. We illustrate this idea by giving an operational definition of maximally entangled states on the basis of communication tasks of teleportation and superdense coding. We also give examples and a procedure to obtain such TMESs for {\\em n}-qubit systems.

Pankaj Agrawal; B. Pradhan

2007-07-29T23:59:59.000Z

392

D:\Web\GC\Test\Price-Anderson\TASK97.PDF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ERIC J. FYGI ACTING GENERAL COUNSEL THROUGH: ELIZABETH A. MOLER THE DEPUTY SECRETARY SUBJECT: ACTION: Preparation of congressionally-mandated report to Congress to review need for continuation or modification of the Price- Anderson Act, section 170 of the Atomic Energy Act of 1954, as amended (AEA). ISSUE: Whether a task force should be established to prepare the report to Congress with DOE's recommendations. BACKGROUND: Congress enacted the Price-Anderson Act in 1957 to establish a comprehensive system to ensure that adequate funds are available to the public to satisfy liability claims in the event of a nuclear incident and to remove the deterrent to private sector participation in nuclear activities that arises from the threat of potentially enormous liability

393

Miniature quartz resonator force transducer  

SciTech Connect

The invention relates to a piezoelectric quartz force transducer having the shape of a double-ended tuning fork.

Eer Nisse, Errol P. (Albuquerque, NM)

1980-01-01T23:59:59.000Z

394

DOE Transmission System Integration Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

395

Midwest Transmission Workshop III Summary  

DOE Green Energy (OSTI)

OAK-B135 On March 12-13, 2002, the National Wind Coordinating Committee (NWCC), in cooperation with regional stakeholders, held a two-day workshop: Planning for Electrical Transmission Needs in the Upper Midwest. The workshop was the outgrowth of an effort to develop a forum and process for consideration of transmission options that strives for equitable allocation of benefits and impacts among all affected parties. The goal of this workshop was to provide a catalyst for an enhanced, inclusive process for transmission planning with participation of and acceptance by all affected stakeholders. Participants in the meeting included representatives of state and regional regulatory agencies, utilities and power generators, the wind industry, environmental and landowner interests, and other interested parties (see Attachment A for a list of meeting participants).

Kevin Bryan

2003-03-12T23:59:59.000Z

396

FAQS Job Task Analyses - Confinement Ventillation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

For Expert, Working or Familiarity Level Competencies CVS/PGT FAQ Job Analysis Worksheet for Tasks Task Source Importance Frequency #1 Serves as SME D&R 5 4 #2 Reviews safety documentation D&R 4+ 3- #3 Participates in standards development and interpretation D&R 2 1 #4 Assesses contractor programs and implementation D&R 4 4 #5 Represents Site/DOE at CVS meetings/committees D&R 3 1 #6 Provides oversight of HEPA filter QA programs D&R 4 3+ #7 Evaluate designs D&R 4+ 2 #8 Maintain proficiency D&R 5 1 Importance Scale Frequency How important is this task to the job? How often is the task performed? 0 = Not Performed 0 = Not Performed 1 = Not Important 1 = Every few months to yearly 2 = Somewhat Important 2 = Every few weeks to monthly

397

EM Task 10 - Technology Development Integration  

SciTech Connect

No activities were performed under this task in the last six months, except to compile a final report which will be included in the overall Environmental Management final report at the conclusion of Year Five. All work is complete.

Thomas A. Erickson

1998-11-01T23:59:59.000Z

398

Variations in task and the ideal observer  

Science Conference Proceedings (OSTI)

In most previous studies involving the ideal observer, the task considered has been that of simple detection where it is assumed that there is complete a priori knowledge of the background and of the possible object's shape, amplitude, and position. It is shown that redefining the detection task to include the possibility of an unknown, slowly varying background reduces the importance of the low-frequency components in the image for the ideal observer. More complicated tasks than object detection are also considered, such as determination of an object's position and width and the resolution of two objects. These higher-order tasks further enhance the importance of the high-frequency information content of the image.

Hanson, K.M.

1983-01-01T23:59:59.000Z

399

Task demands affect lipreaders’ search for information  

Science Conference Proceedings (OSTI)

Two experiments were conducted to determine whether a lipreader’s task (making phonemic or prosodic distinctions about the spoken message) changes the regions of the talker’s face from which information is needed

Charissa R. Lansing; Heather D. Minch; George W. McConkie

1995-01-01T23:59:59.000Z

400

An Act to Implement the Recommendations of the Governor's Ocean Energy Task  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

An Act to Implement the Recommendations of the Governor's An Act to Implement the Recommendations of the Governor&#039;s Ocean Energy Task Force (Maine) An Act to Implement the Recommendations of the Governor's Ocean Energy Task Force (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Program Info State Maine Program Type Siting and Permitting Provider Department of Environmental Protection This law was enacted to overcome economic, technical and regulatory

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Transmission Rights and Market Power James Bushnell  

E-Print Network (OSTI)

of the transmission grid can advantage some competitors at the expense of others. In electricity markets around control of transmission paths. In electricity markets such as California's, even financial transmissionPWP-062 Transmission Rights and Market Power James Bushnell April, 1999 This paper is part

California at Berkeley. University of

402

The Development of HVDC Transmission System  

Science Conference Proceedings (OSTI)

The ever increasing process of high-voltage high-power fully controlled semiconductor technology has promoted the flexible ac transmission systems ahead significantly. Developments advance both the HVDC power transmission and the flexible ac transmission ... Keywords: converters station, HVDC transmission systems, power electronics

Yang Zhou; Dao Zhuojiang; Yu Fenwang

2012-07-01T23:59:59.000Z

403

Principles for interregional transmission expansion  

Science Conference Proceedings (OSTI)

In aiming to facilitate the siting of interregional transmission lines, some basic principles might include an approach where the Federal Energy Regulatory Commission uses a variety of tools to capture the value of new transmission, and thus increase the supply of interregional lines. There also may be opportunities for the Commission to work with localities to reduce resistance to new lines by means of economic incentives. Such a tack has the potential to be more efficient than fighting local opposition in the courts. (author)

Benjamin, Richard

2007-10-15T23:59:59.000Z

404

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

405

Force spectroscopy of polymer desorption: Theory and Molecular Dynamics simulation  

E-Print Network (OSTI)

Forced detachment of a single polymer chain, strongly-adsorbed on a solid substrate, is investigated by two complementary methods: a coarse-grained analytical dynamical model, based on the Onsager stochastic equation, and Molecular Dynamics (MD) simulations with Langevin thermostat. The suggested approach makes it possible to go beyond the limitations of the conventional Bell-Evans model. We observe a series of characteristic force spikes when the pulling force is measured against the cantilever displacement during detachment at constant velocity $v_c$ (displacement control mode) and find that the average magnitude of this force increases as $v_c$ grows. The probability distributions of the pulling force and the end-monomer distance from the surface at the moment of final detachment are investigated for different adsorption energy $\\epsilon$ and pulling velocity $v_c$. Our extensive MD-simulations validate and support the main theoretical findings. Moreover, the simulation reveals a novel behavior: for a strong-friction and massive cantilever the force spikes pattern is smeared out at large $v_c$. As a challenging task for experimental bio-polymers sequencing in future we suggest the fabrication of stiff, super-light, nanometer-sized AFM probe.

J. Paturej; J. L. A. Dubbeldam; V. G. Rostiashvili; A. Milchev; T. A. Vilgis

2013-10-14T23:59:59.000Z

406

EM Employee Serves Military in Afghanistan, Manages $5.8 Billion Army Task  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Employee Serves Military in Afghanistan, Manages $5.8 Billion Employee Serves Military in Afghanistan, Manages $5.8 Billion Army Task Order EM Employee Serves Military in Afghanistan, Manages $5.8 Billion Army Task Order February 27, 2013 - 12:00pm Addthis James Hawkins James Hawkins BAGRAM AIRFIELD, Afghanistan - EM employee James Hawkins is currently serving the U.S. military in Afghanistan, where he is administering a $5.8 billion task order for the Army. A major in the U.S. Air Force Reserves, Hawkins is an administrative contracting officer for the Defense Contract Management Agency, a component of the Defense Department that directly contributes to the military readiness of the U.S. and its allies. Hawkins is an acquisition planning manager and procurement analyst in the Office of Procurement Planning in EM's Office of Acquisition and Project

407

Force Control and Nonlinear Master-Slave Force Profile to Manage an Admittance Type Multi-Fingered Haptic User Interface  

Science Conference Proceedings (OSTI)

Natural movements and force feedback are important elements in using teleoperated equipment if complex and speedy manipulation tasks are to be accomplished in remote and/or hazardous environments, such as hot cells, glove boxes, decommissioning, explosives disarmament, and space to name a few. In order to achieve this end the research presented in this paper has developed an admittance type exoskeleton like multi-fingered haptic hand user interface that secures the user’s palm and provides 3-dimensional force feedback to the user’s fingertips. Atypical to conventional haptic hand user interfaces that limit themselves to integrating the human hand’s characteristics just into the system’s mechanical design this system also perpetuates that inspiration into the designed user interface’s controller. This is achieved by manifesting the property differences of manipulation and grasping activities as they pertain to the human hand into a nonlinear master-slave force relationship. The results presented in this paper show that the admittance-type system has sufficient bandwidth that it appears nearly transparent to the user when the user is in free motion and when the system is subjected to a manipulation task, increased performance is achieved using the nonlinear force relationship compared to the traditional linear scaling techniques implemented in the vast majority of systems.

Anthony L. Crawford

2012-08-01T23:59:59.000Z

408

Transmission System Reliability Performance Metrics Requirements  

Science Conference Proceedings (OSTI)

Transmission availability has become the significant indicator of overall transmission system operational health, due to increased utilization of the transmission system, growth of deregulated energy wholesale markets, and decreased investment in new transmission assets. Availability trends reflect the increasing dependence upon transmission assets from a technical and market perspective. Presently availability metrics lack comparability due to the non-standardization of underlying data collection method...

2003-12-12T23:59:59.000Z

409

TEXT Pro Force Training  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Basic Protective Basic Protective Force Training Program DOE/IG-0641 March 2004 * None of the 10 sites included instruction in rappelling even though it was part of the special response team core curriculum and continued to be offered by the Nonprolif- eration and National Security Institute; * Only one site conducted basic training on use of a shotgun, despite the fact that a num- ber of sites used the weapon for breaching exercises and other purposes; and, * Seven of the sites modified prescribed training techniques by reducing the intensity or delivery method for skills that some security experts characterized as critical, such as handcuffing, hand-to- hand combat, and vehicle assaults. We found that the Department's facilities were not required to report departures from the core

410

Transmission System SQRA Assessment Methods  

Science Conference Proceedings (OSTI)

Market conditions and increasingly stringent regulatory requirements have focused attention on metrics that quantify the Security, Quality, Reliability, and Availability (SQRA) of transmission systems. This report summarizes the state-of-the-art in performance metrics, provides four case studies of their use, and discusses future trends in reliability metrics, congestion metrics, and benchmarking.

2009-07-31T23:59:59.000Z

411

Underground Transmission Systems Reference Book  

Science Conference Proceedings (OSTI)

The Underground Transmission Systems Reference Book covers all stages of cable system design and operation, from initial planning studies to failure analysis. It contains contributions from many of the industry's experts and represents practices from all parts of the United States.

1993-03-01T23:59:59.000Z

412

Power superconducting power transmission cable  

DOE Patents (OSTI)

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

413

Transmission Access Charge Informational Filing  

E-Print Network (OSTI)

of any new Participating Transmission Owner (“Participating TO”) during the proceeding six months or (2) changes to Transmission Revenue Requirements of any of the Participating TOs. 1 Because the Access Charges are determined through a formula rate mechanism, these semi-annual adjustments take place automatically. In the enclosed informational filing, the ISO is providing notice regarding the updated Access Charges that reflect the charges that will be in effect beginning January 1, 2002 in accordance with the formula rate. The adjusted charges are based on the modified Transmission Revenue Requirements, both High Voltage and Low Voltage as a result of: (1) the Offer of Settlement accepted by the Commission in Pacific Gas & Electric Company’s (“PG&E”) Docket No. ER01-66-000, (2) San Diego Gas and Electric Company’s supplemental surcharge accepted, subject to refund, in Docket No. ER01-3074-000, and (3) the annual adjustment to the Transmission Revenue Balancing Account (“TRBA”) of the Participating TOs. 1 Capitalized terms not otherwise defined herein are defined in the Master Definitions

unknown authors

2001-01-01T23:59:59.000Z

414

Boundary stabilization of transmission problems  

E-Print Network (OSTI)

We study the transmission problem in bounded domains with dissipative boundary conditions. Under some natural assumptions, we prove uniform bounds of the corresponding resolvents on the real axis at high frequency, and as a consequence, we obtain free of eigenvalues regions. As an application, we get exponential decay of the energy of the solutions of the correpsonding mixed boundary value problems.

Fernando Cardoso; Georgi Vodev

2009-10-20T23:59:59.000Z

415

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

416

Giant van der Waals and Casimir interactions via transmission lines  

E-Print Network (OSTI)

We show that the van der Waals (vdW) and Casimir forces between neutral particles can be enhanced by many orders of magnitude upon changing the character of the force-mediating vacuum photon-modes. By considering two induced dipoles in the vicinity of any standard electric transmission line, where photons can propagate in one dimension (1d), we find analytically that the interaction scales nontrivially with the inter-dipolar distance, resulting in much stronger and longer-range interaction than in free-space. This may have profound implications on the non-additivity of vdW and Casimir interactions in many-particle systems, and open the door for Casimir phenomena in 1d. We discuss the possibilities of measuring this effect, e.g. in a coplanar waveguide line.

Ephraim Shahmoon; Igor Mazets; Gershon Kurizki

2013-04-07T23:59:59.000Z

417

Protective Force Firearms Qualification Courses  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROTECTIVE FORCE PROTECTIVE FORCE FIREARMS QUALIFICATION COURSES U.S. DEPARTMENT OF ENERGY Office of Health, Safety and Security AVAILABLE ONLINE AT: INITIATED BY: http://www.hss.energy.gov Office of Health, Safety and Security Protective Force Firearms Qualification Courses July 2011 i TABLE OF CONTENTS SECTION A - APPROVED FIREARMS QUALIFICATION COURSES .......................... I-1 CHAPTER I . INTRODUCTION ................................................................................... I-1 1. Scope .................................................................................................................. I-1 2. Content ............................................................................................................... I-1

418

Physics Out Loud - Electromagnetic Force  

NLE Websites -- All DOE Office Websites (Extended Search)

Detector Previous Video (Detector) Physics Out Loud Main Index Next Video (Electron Scattering) Electron Scattering Electromagnetic Force Cynthia Keppel, a nuclear physicist,...

419

FAQS Job Task Analyses - Emergency Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management FAQS Emergency Management FAQS August 2010 STEP 1: Job Task Analysis for Tasks Task (and Number) Source Importance Frequency Plan, observe and evaluate emergency management activities and Federal and contractor technical performance to ensure the adequacy, effectiveness, and compliance with Department of Energy (DOE) Order 151.1B and other DOE Orders and Federal regulations. FAQS Duties and Responsibilities #3 5 3 Review, and/or approve emergency management documentation. FAQS Duties and Responsibilities #4 3 2 Facilitate the notification and reporting of emergencies under Department of Energy (DOE) Order 151.1B Comprehensive Emergency Management System. FAQS Duties and Responsibilities #6 4 1 Resolve, or facilitate the resolution of, emergency management issues.

420

FAQS Job Task Analyses - Chemical Processing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chemical Processing FAQS Chemical Processing FAQS August 2010 STEP 1: Job Task Analysis for Tasks Task (and Number) Source Importance Frequency Critically analyze system design-basis documentation and related safety documentation to ensure application of the principle of safety in design as described in DOE O 413.3-1 (2006), Project Management for the Acquisition of Capital Assets and associated guides. FAQS Duties and Responsibilities Paragraph A 3 2 Evaluate DOE facility and program-related chemical processes for safe and efficient process startup, operation, maintenance, and testing, including emergency systems. FAQS Duties and Responsibilities Paragraph D 5 4 Verify the application of quality assurance, configuration management, and safety requirements to chemical

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Sensor application survey. Technical report, task 1  

DOE Green Energy (OSTI)

Task 1 is a survey of well logging instrumentation undertaken to determine to what extent various tools can make use of severe environment acoustic sensor technology. The major goal was to establish the most appropriate tool for Task 2-Sensor Development and Optimization. Subject tools are borehole televiewer (BHTV), acoustic caliper, acoustic velocity logger, down hole flow meter (DHFM), and passive listening monitor. This report describes the investigation of tool capabilities, applications, operation, and limitations under present and anticipated geothermal conditions. The results of Task 1 suggest that development of a combination BHTV/Caliper tool would have the most favorable impact on improved geothermal well logging capabilities. Of nearly equal significance is DHFM. Acoustic velocity logger and passive listening devices are viewed as playing an important but lower priority role in geothermal resource characterization and development.

Not Available

1978-01-01T23:59:59.000Z

422

TASK PLAN: Tribal Issues Topic Group  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Plan 1 Tribal Issues Topic Group 7/12/00 Task Plan 1 Tribal Issues Topic Group 7/12/00 Task Plan 1 Page 1 Status: Active DOE Lead: National Transportation Program (NTP-AL; Judith Holm @ 505-845-4767) Start Date: January 1998 End Date: TBD Subject: TEC Topic Group - Tribal Issues rpose: To address issues such as: (1) HM-164 as it relates to Tribes; (2) to complete the Tribal column of the Rail Topic Group Regulatory Matrix; (3) to determine Tribal authority to stop and inspect shipments of radioactive materials; (4) to provide tribal pre-notification of DOE spent fuel shipments consistent with DOE policy and to provide continuous satellite-based tracking and monitoring capability to Tribes; (5) and to address Tribal involvement in transportation planning, training, and funding. The Topic Group

423

Efficiency Benefits of EHV AC Transmission and Overlays in Interregional Transmission Expansion Planning  

Science Conference Proceedings (OSTI)

In the United States, transmission expansion planning historically focused on addressing local utility transmission needs. In the mid-to-late 1990s, the focus shifted to encompass regional transmission expansion, primarily driven by Federal Energy Regulatory Commission (FERC) mandates on open transmission access and emergence of regional transmission organizations. In recent years, three drivers have elevated transmission expansion planning to a higher, interregional level. These drivers are the ...

2012-11-29T23:59:59.000Z

424

Effects of task difficulty on evoked gamma activity and ERPs in a visual discrimination task  

E-Print Network (OSTI)

¼ 1:66, P , 0:3). 3.3. Gamma responses Bursts of gamma activity after stimulus onset were only found-related synchronization in the gamma band. Brain 1998;121:2301­2315. De Pascalis V, Ray WJ. Effects of memory loadEffects of task difficulty on evoked gamma activity and ERPs in a visual discrimination task Daniel

Herrmann, Christoph

425

Does entropic force always imply the Newtonian force law?  

E-Print Network (OSTI)

We study the entropic force by introducing a bound between entropy and area of $S \\le A^{3/4}$ which was derived by imposing the non-gravitational collapse condition. In this case, applying a recent argument of Verlinde to this system does not lead to the Newtonian force law.

Myung, Yun Soo

2010-01-01T23:59:59.000Z

426

NREL: Transmission Grid Integration - Webinars  

NLE Websites -- All DOE Office Websites (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

427

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

428

transmission | OpenEI Community  

Open Energy Info (EERE)

21 21 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235321 Varnish cache server transmission Home Kyoung's picture Submitted by Kyoung(155) Contributor 12 November, 2012 - 09:17 Legal Reviews are Underway BHFS Legal review permitting power plant roadmap transmission The legal review of the Regulatory Roadmap flowcharts and supporting content is well underway and will continue for the next several months with our legal team at [www.bhfs.com Brownstein Hyatt Farber and Schreck]. The

429

Minnesota Agripower Project, Task IV research report  

DOE Green Energy (OSTI)

Economic analysis is being conducted by the Department of Applied Economics in support of Minnesota Alfalfa Producer`s development of alfalfa as a dedicated biomass feedstock for energy production. University Researchers have assisted in the development and implementation of inventory control systems and procedures. This report lists the tasks for which researchers are currently finalizing economic analysis. The tasks encompass three main areas: (1) optimization of feedstock transportation system, (2) analysis of market potential for new alfalfa products, and (3) total systems analysis.

Fruin, J.; Tiffany, D.

1997-10-30T23:59:59.000Z

430

Midwest Transmission Workshop II Summary  

DOE Green Energy (OSTI)

OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

Kevin Bryan

2002-12-05T23:59:59.000Z

431

Guide for Transmission Line Grounding  

Science Conference Proceedings (OSTI)

Electrical utilities have a duty to provide effective grounding for managing steady-state and fault currents, whether near a large generating station or at a remote distribution pole ground. For transmission lines, this imperative is usually met with investment in overhead ground wires and grounding electrodes. Effective grounding at each tower improves reliability8212by providing low path impedance to lightning strokes8212and contributes to safety. However, the fundamental physical parameters in ground ...

2007-12-20T23:59:59.000Z

432

High current pulse transmission cable  

DOE Patents (OSTI)

This invention is comprised of a transmission cable for carrying high current pulses in which an even numbered plurality of electrical conductors surrounds a central ground conductor. Each electrical conductor is connected so that it at any instant in time it will carry current of opposite polarity to the polarity carried by adjacent conductors. This arrangement cancels practically all of the external fields generated by current in the conductors.

Parsons, W.M.

1990-09-28T23:59:59.000Z

433

Flexible and Strategic Transmission Planning  

Science Conference Proceedings (OSTI)

This update describes two separate but related planning frameworks developed for this project: 1) balancing of reliability and economics in transmission planning and 2) consideration of the need for operational flexibility in planning. Projects that improve reliability can also improve economics, and vice versa. The challenge is in achieving the reliability goals with as much economic benefit as possible, in other words, balancing the reliability and economic goals without compromising either. A method o...

2011-12-22T23:59:59.000Z

434

Coiled transmission line pulse generators  

DOE Patents (OSTI)

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

435

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

in calculating the unit cost of wind energy transmissionimpacts of the cost of transmission for wind energy. Only inj = Transmission cost per unit of wind energy weighted by

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

436

Definition: Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Service Service Jump to: navigation, search Dictionary.png Transmission Service Services provided to the Transmission Customer by the Transmission Service Provider to move energy from a Point of Receipt to a Point of Delivery.[1] Related Terms transmission lines, Transmission Customer, Transmission Service Provider, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Service&oldid=480302" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

437

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

438

A Computer Package for Transmission Line Analysis  

Science Conference Proceedings (OSTI)

A computer program, LIGNE, has been developed as a comprehensive teaching aid for the section on transmission line theory in an electromagnetics course. The program assists the student in the analysis of transmission lines, enabling him to quickly assess ...

Georges-Andre Chaudron; Manfred Nachman

1987-11-01T23:59:59.000Z

439

Transmission Expansion Planning with Re-design  

E-Print Network (OSTI)

Expanding an electrical transmission network requires heavy investments ... Long term transmission expansion planning determines, over an horizon of 10 or more years, ... generation sites are usually far away from the consumption centers.

440

Wireless power transmission for medical applications  

E-Print Network (OSTI)

We studied the wireless power transmission capabilities of microwave through human skin-tissue. Microwave transmission through simulated human skins was tested with rectenna array as a power receiver located under the ...

Payne, Joshua E.

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

442

EEI/DOE Transmission Capacity Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

443

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

low load levels there can be situations where the capacitive component of the transmission line causes voltage

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

444

Alternative Transmission Technologies for Joint Planning Studies  

Science Conference Proceedings (OSTI)

This report describes a detailed analysis of joint transmission planning needs and capabilities, including an assessment of current research in the area. The report has value as a starting point and reference for transmission planners engaged in joint planning exercises because it focuses on technologies that could facilitate joint transmission planning of a bulk power grid. A joint planning exercise involves the collaboration of multiple transmission planning groups that may each have ...

2013-12-09T23:59:59.000Z

445

Average transmission probability of a random stack  

E-Print Network (OSTI)

The transmission through a stack of identical slabs that are separated by gaps with random widths is usually treated by calculating the average of the logarithm of the transmission probability. We show how to calculate the average of the transmission probability itself with the aid of a recurrence relation and derive analytical upper and lower bounds. The upper bound, when used as an approximation for the transmission probability, is unreasonably good and we conjecture that it is asymptotically exact.

Yin Lu; Christian Miniatura; Berthold-Georg Englert

2009-07-31T23:59:59.000Z

446

Directional Reactive Power Ground Plane Transmission  

Directional Reactive Power Ground Plane Transmission Technology Summary ... The invention can transmit electrical power through the surface of the ...

447

High Resolution Transmission Microscopy Characterization of an ...  

Science Conference Proceedings (OSTI)

High Resolution Transmission Microscopy Characterization of an Oxide ... Line Dislocation Dynamics Simulation of fundamental dislocation properties in ...

448

Advantages of Integrating Precession Scanning Transmission ...  

Science Conference Proceedings (OSTI)

Presentation Title, Advantages of Integrating Precession Scanning Transmission Electron Microscopy in the Characterization of Metallic Materials. Author(s) ...

449

Transmission Electron Microscopy Studies on Lithium Battery ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2012 TMS Annual Meeting & Exhibition. Symposium , Energy Nanomaterials. Presentation Title, Transmission Electron Microscopy ...

450

Task Management Computer Science and Engineering, UCSD  

E-Print Network (OSTI)

solar cells and stored in a supercapacitor. With sunlight, SHiMmer can operate for long periods of time buffer ­ supercapacitor predictor ­ prediction of future energy harvesting rate controller the supercapacitor lacks sufficient energy to execute a given set of tasks, it is possible to put the device to sleep

Simunic, Tajana

451

Evolving Static Representations for Task Transfer  

Science Conference Proceedings (OSTI)

An important goal for machine learning is to transfer knowledge between tasks. For example, learning to play RoboCup Keepaway should contribute to learning the full game of RoboCup soccer. Previous approaches to transfer in Keepaway have focused on transforming ...

Phillip Verbancsics; Kenneth O. Stanley

2010-03-01T23:59:59.000Z

452

Gender Differences in Interface Type Task Analysis  

Science Conference Proceedings (OSTI)

The three pillars of usability are efficiency, effectiveness and satisfaction. Today's human-computer interface HCI, used in cellular phone, software, Internet, personal digital assistants and others should be designed to meet these three pillars. This ... Keywords: Gender, Icon, Interface, Menu, Perceived Ease of Use, Perceived Usefulness, Task Completion

Raafat George Saadé; Dennis Kira; Camille Alexandre Otrakji

2012-04-01T23:59:59.000Z

453

Air Force Renewable Energy Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Ken Gray P.E. HQ AFCESA /CENR Air Force Renewable Energy Programs April, 2011 FUPWG "Make Energy a Consideration in All We Do" I n t e g r i t y - S e r v i c e - E x c e l l e n c e THINK GREEN, BUILD GREEN, Topics  Air Force Energy Use  Air Force Facility Energy Center  Current RE Generation  Project Development System  Programmed RE Generation FY11-13  Goal Achievement 2 I n t e g r i t y - S e r v i c e - E x c e l l e n c e THINK GREEN, BUILD GREEN, Air Force 2010 Energy Use The Air Force spent approximately $8.2 billion for energy in 2010; an increase of 22% from 2009 Energy Cost and Consumption Trends Energy Cost Breakdown Aviation 79% Facilities 17% 3 Aviation 84% Facilities 12% Vehicles & Equipment

454

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

455

Exploration of Resource and Transmission Expansion Decisions  

E-Print Network (OSTI)

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energyin.S. Department of Energy, Office of Electricity Delivery and Energy Reliability, Permitting, Siting and Analysis Division #12;Resource and Transmission ExpansionResource and Transmission Expansion Decisions in WREZ

456

Transportation Center Seminar........ "Proactive Transmission Planning in  

E-Print Network (OSTI)

Transportation Center Seminar........ "Proactive Transmission Planning in Electricity Networks of the biggest problems of actual power-systems transmission planning is its reactive nature. We formulate-systems transmission planning, generation investment, and market operation decisions and propose a methodology to solve

Bustamante, Fabián E.

457

The real problem with Merchant transmission  

SciTech Connect

Current regulatory policy distinguishes transmission investments that have primarily economic benefits from those that primarily enhance reliability. But no such dichotomy exists; congestion and reliability are inter-related in complex ways. Thus, solving the transmission investment problem is more complex than ''fixing'' merchant transmission; investment in the grid must be treated as a systems problem. (author)

Blumsack, Seth; Lave, Lester B.; Ilic, Marija

2008-03-15T23:59:59.000Z

458

FAQS Job Task Analyses - Environmental Restoration Functional Area Qualification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Restoration Functional Area Qualification Restoration Functional Area Qualification Job Task Analysis CONDUCTING THE JOB / TASK ANALYSIS Identify and evaluate tasks - Develop a comprehensive list of tasks that define the job. o A great starting point is the list of Duties and Responsibilities from the FAQS. o Give careful thought to additional tasks that could be considered. o Don't worry about deleting tasks at this point - that is a part of the process further down. - List the tasks (and their sources, e.g., Duties and Responsibilities #1) in the chart below. - Discuss each task as a group and come to a consensus pertaining to Importance and Frequency of the task (i.e., each team member can consent to the assigned value, even if they don't exactly agree with it). - When all values have been assigned, consider as a group deleting tasks

459

FAQS Job Task Analyses - General Technical Base FAQS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GTB JTA: CONDUCTING THE JOB / TASK ANALYSIS GTB JTA: CONDUCTING THE JOB / TASK ANALYSIS (10/26/11) Step 1 Identify and evaluate tasks - Develop a comprehensive list of tasks that define the job. o A great starting point is the list of Duties and Responsibilities from the FAQS. o Give careful thought to additional tasks that could be considered. o Don't worry about deleting tasks at this point - that is a part of the process further down. - List the tasks (and their sources, e.g., Duties and Responsibilities #1) in the chart below. - Discuss each task as a group and come to a consensus pertaining to Importance and Frequency of the task (i.e., each team member can consent to the assigned value, even if they don't exactly agree with it). - When all values have been assigned, consider as a group deleting tasks

460

Final report: Task 4a.2 20% wind scenario assessment of electric grid operational features  

SciTech Connect

Wind integration modeling in electricity generation capacity expansion models is important in that these models are often used to inform political or managerial decisions. Poor representation of wind technology leads to under-estimation of wind's contribution to future energy scenarios which may hamper growth of the industry. The NREL's Wind Energy Deployment System (WinDS) model provides the most detailed representation of geographically disperse renewable resources and the optimization of transmission expansion to access these resources. Because WinDS was selected as the primary modeling tool for the 20% Wind Energy by 2030 study, it is the ideal tool for supplemental studies of the transmission expansion results. However, as the wind industry grows and knowledge related to the wind resource and integration of wind energy into the electric system develops, the WinDS model must be continually improved through additional data and innovative algorithms to capture the primary effects of variable wind generation. The detailed representation of wind technology in the WinDS model can be used to provide improvements to the simplified representation of wind technology in other capacity expansion models. This task did not employ the WinDS model, but builds from it and its results. Task 4a.2 provides an assessment of the electric grid operational features of the 20% Wind scenario and was conducted using power flow models accepted by the utility industry. Tasks 2 provides information regarding the physical flow of electricity on the electric grid which is a critical aspect of infrastructure expansion scenarios. Expanding transmission infrastructure to access remote wind resource in a physically realizable way is essential to achieving 20% wind energy by 2030.

Toole, Gasper L. [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, R.B.

1985-08-15T23:59:59.000Z

462

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

463

Electronics and hydraulics control transmission  

SciTech Connect

Caterpillar engineers have combined electronics and hydraulics for improved transmission control and productivity. The control system had extensive field test experience during development. The system accumulated more than 100,000 hours on 17 vehicles, with individual vehicle times in the 2000-10,000-hour range. Job sites were chosen to test the system over a wide range of applications and locales. The EPTC components are CAT-designed and made by outside suppliers. The components must comply with CAT designs and specifications. All components are 100% functionally tested. The control box is computer-tested functionally at the supplier and at CAT before vehicle installation.

Morris, H.C.; Sorrells, G.K.

1986-04-01T23:59:59.000Z

464

The role of transmission investment in the coordination between generation and transmission  

E-Print Network (OSTI)

generation and transmission of electricity into distinct modules. The governance structure of transmission the governance of electricity transmission assets influences the implementation of power flow management. Finally to coordinate generation and transmission of electricity is in real organizations. 1 Assistant Professors

Paris-Sud XI, Université de

465

Application of EPRI's Transmission Services Costing Framework to the Development of Open Access Transmission Tariffs  

Science Conference Proceedings (OSTI)

Public utilities in the United States are expected to provide transmission services and ancillary services to eligible customers. This report documents how Centerior Energy Corporation developed a network integration transmission service tariff, a point-to-point transmission service tariff, and four ancillary services tariffs by applying EPRI's Transmission Services Costing Framework.

1996-03-09T23:59:59.000Z

466

SunZia Southwest Transmission Project Comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

467

California/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Roadmap < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

468

Colorado/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Roadmap < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

469

Arizona/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

470

CERTS 2012 Program Review - NASPI Leadership and Task Team Technical Support - Jeff Dagle, PNNL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PNNL Support for NASPI PNNL Support for NASPI Jeff Dagle Pacific Northwest National Lab jeff.dagle@pnnl.gov 11/12 June 2012 Washington, DC OE Transmission Reliability Program Review 2 Project Objective(s) To improve the reliable operation of the North American power system by successfully transitioning synchrophasor technologies from research to industry adoption PNNL's activities in support of NASPI include:  Facilitate leadership and planning activities for the NASPI leadership team and work group meetings  Support the NASPI website, mailing lists, and task team administrative support (e.g., conference call scheduling and facilitation) PNNL Activities in Support of NASPI in FY12 (cont.)  Special assignments

471

Transmission grid access and pricing in Norway, Spain, and California: A comparative study  

Science Conference Proceedings (OSTI)

The openness of the transmission grid and the incentives given by transmission pricing form the foundation for retail and wholesale competition in the electricity market. The deregulated markets of Norway, Spain, and California all have introduced retail access and wholesale competition, although with different approaches to pricing of transmission grid services. This paper will briefly describe the three different solutions, and discuss some of their implications. Of the three electricity systems, Norway was the first to open the grid to competition in electricity trade. The Norwegian Energy Law of 1990 introduced open competition to wholesale and retail trade starting January 1991. In Spain, the Electricity Law of 1997 came into force early in 1998. Wholesale and retail markets in California were opened for competition on April 1, 1998, following the passage of Assembly Bill 1890, in August 1996. Introducing competition in electricity markets also implies introducing Third Party Access to the transmission grid. All potential competitors have to be given access to the grid in order to compete, no matter who owns the actual wires. This principle raises several challenges, notably, how to price transmission services. Who is to pay for which transmission services? The Norwegian grid is divided into three levels depending on its function. The transmission grid includes all parts of the national grid having a transmission function, meaning that some lower voltage levels also are included. In Spain, the definition of the transmission grid is similar, including the 400 kV and 220 kV national grid as well as lower voltage installations that could affect transmission operation or generation dispatch. For historic reasons, wholesale electricity transactions in the US are regulated by the federal government through the FERC. However, operations of utility systems within one state fall primarily under state jurisdiction. Because the utility systems in California generally are large and exchanges between them limited, the role of FERC was small prior to restructuring, although the state is a large importer of power.

Gronli, H.; Gomez San Ramon, T.; Marnay, C.

1999-09-01T23:59:59.000Z

472

Transmission Electron Microscopy Study of InN Nanorods  

E-Print Network (OSTI)

Transmission Electron Microscopy Study of InN Nanorods Z.epitaxy and studied by transmission electron microscopy,establish their quality. Transmission electron microscopy (

Liliental-Weber, Z.; Li, X.; Kryliouk, Olga; Park, H.J.; Mangum, J.; Anderson, T.

2008-01-01T23:59:59.000Z

473

National Transmission Grid Study: 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Grid Study: 2002 National Transmission Grid Study: 2002 National Transmission Grid Study: The National Energy Policy Plan directed the U.S. Department of Energy (DOE)...

474

California/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

CaliforniaTransmissionLocal Regulations < California | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State...

475

Transmission Forum Agenda - February 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Forum Agenda - February 2012 Transmission Forum Agenda - February 2012 FINAL AGENDA - Transmission Forum Feb 2012 (Denver) 020212.pdf More Documents & Publications DOE...

476

PP-76 The Vermont Electric Transmission Company | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 The Vermont Electric Transmission Company PP-76 The Vermont Electric Transmission Company Presidential Permit authorizing The Vermont Electric Transmission Company to construct,...

477

PP-76-1 The Vermont Electric Transmission Company | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76-1 The Vermont Electric Transmission Company PP-76-1 The Vermont Electric Transmission Company Presidential Permit authorizing The Vermont Electric Transmission Company to...

478

EMISSION AND TRANSMISSION NOISE PROPAGATION IN POSITRON EMISSION COMPUTED TOMOGRAPHY  

E-Print Network (OSTI)

26-29, 1979 EMISSION AND TRANSMISSION NOISE PROPAGATION INLBL-9783 EMISSION AND TRANSMISSION NOISE PROPAGATION INl·. LBL-9783 EMISSION AND TRANSMISSION NOISE PROPAGATION IN

Gullberg, G.T.

2010-01-01T23:59:59.000Z

479

Comments of New England Electric Transmission Corporation on...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and...

480

Nuclear forces and chiral theories  

SciTech Connect

Recent successes in ab initio calculations of light nuclei (A=2-6) will be reviewed and correlated with the dynamical consequences of chiral symmetry. The tractability of nuclear physics evinced by these results is evidence for that symmetry. The relative importance of three-nucleon forces, four-nucleon forces, multi-pion exchanges, and relativistic corrections will be discussed in the context of effective field theories and dimensional power counting. Isospin violation in the nuclear force will also be discussed in this context.

Friar, J.L. [Los Alamos National Lab., NM (United States)]|[Washington Univ., Seattle, WA (United States). Inst. for Nuclear Theory

1995-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission task force" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Automated manual transmission mode selection controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI)

1999-11-09T23:59:59.000Z

482

Automated manual transmission shift sequence controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Richard G. (Royal Oak, MI); Rausen, David J. (Denver, CO)

2000-02-01T23:59:59.000Z

483

Colorado/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Colorado/Transmission/Summary Colorado/Transmission/Summary < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution. State Siting Act None State Preemptive Authority The CPUC has backstop authority only. If a permit is denied by the local government, the applicant may appeal to the CPUC if certain conditions are met (CRS 29-20-108).

484

Idaho/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Roadmap Idaho/Transmission/Roadmap < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

485

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Idaho, the state's siting authority is limited to siting approvals on state property, and high voltage transmission lines (115kV or greater) within a National Interstate Electric Transmission Corridor (NIETC). Under these circumstances a Route Permit would be required by the Idaho Public Utilities Commission (IPUC); however, no such corridors have been designated and therefore the process has not been tested. Local governments

486

Open Access Transmission and Renewable Energy Technologies  

Science Conference Proceedings (OSTI)

In April 1996, the Federal Regulatory Commission (PERC) approved Orders 888 and 889 and released a draft rule for public comment on capacity reservation tariffs (CRTs). Order No. 888 requires electric utilities to file transmission tariffs that would allow transmission access to third parties who want to conduct wholesale transactions, and Order No. 889 requires transmission-owning utilities to set up open access, same-time information systems (OASIS), using commercial software and Internet protocols. This paper discusses these Orders in detail, as well as some of the issues before FERC with implications for renewables, which include: transmission pricing; transmission terms and conditions; reassignment of transmission capacity; defining state and FERC jurisdiction over transmission and distribution; the pricing of ancillary services; and the adoption and implementation of independent system operators.

Porter, K.

1996-09-01T23:59:59.000Z

487

Introducing shared tasks to NLG: the TUNA shared task evaluation challenges  

Science Conference Proceedings (OSTI)

Shared Task Evaluation Challenges (stecs) have only recently begun in the field of nlg. The tuna stecs, which focused on Referring Expression Generation (reg), have been part of this development since its inception. This chapter looks back on the experience ...

Albert Gatt; Anja Belz

2010-01-01T23:59:59.000Z

488

TASK 40: Sustainable International Bio Energy Trade: securing supply Overview of the task  

E-Print Network (OSTI)

the agenda and initiate a host of new activities relevant for developing biomass potentials worldwide, Rob Remmers from Essent had to withdraw from task leadership due to job changes within the company

489

Review of the silicon material task  

DOE Green Energy (OSTI)

The Silicon Material Task of the Flat-Plate Solar Array Project was assigned the objective of developing the technology for low-cost processes for producing polysilicon suitable for terrestrial solar-cell applications. The Task program comprised sections for process developments for semiconductor-grade and solar-cell-grade products. To provide information for deciding upon process designs, extensive investigations of the effects of impurities on material properties and the performance of cells were conducted. The silane process of the Union Carbide Corporation was carried through several stages of technical and engineering development; a pilot plant was the culmination of this effort. The work to establish silane fluidized-bed technology for a low-cost process is continuing. The advantages of the use of dichlorosilane in a Siemens-type process were shown by Hemlock Semiconductor Corporation. The development of other processes is described.

Lutwack, R.

1984-02-01T23:59:59.000Z

490

How important tasks are performed: peer review  

E-Print Network (OSTI)

The advancement of various fields of science depends on the actions of individual scientists via the peer review process. The referees' work patterns and stochastic nature of decision making both relate to the particular features of refereeing and to the universal aspects of human behavior. Here, we show that the time a referee takes to write a report on a scientific manuscript depends on the final verdict. The data is compared to a model, where the review takes place in an ongoing competition of completing an important composite task with a large number of concurrent ones - a Deadline -effect. In peer review human decision making and task completion combine both long-range predictability and stochastic variation due to a large degree of ever-changing external "friction".

Hartonen, T; 10.1038/srep01679

2013-01-01T23:59:59.000Z

491

Joint Outreach Task Group (JOTG) Calendar: June  

NLE Websites -- All DOE Office Websites (Extended Search)

Former Worker Program (FWP) Home Covered Sites/Populations › Construction Worker Screening Projects › Production Worker Screening Projects › Supplemental Screening Program › Beryllium Vendor Screening Program Upcoming Events Program Implementation Outreach Medical Screening - Conventional Medical Screening - Early Lung Cancer Detection Communicating Results Protecting Participant Information Sharing De-identified Data Chronic Beryllium Disease Awareness Joint Outreach Task Group (JOTG) Worker Testimonials Contact Us FWP Scientific Publications FWP Documents Related Links Office of Health and Safety Home Page HSS Logo Joint Outreach Task Group Calendar: June 2013 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 26 27 28 29 30 31 1 2 3 4 FWP Event Mound Miamisburg, OH

492

River-Forced Estuarine Plumes  

Science Conference Proceedings (OSTI)

The development, maintenance, and dissipation of river-forced estuarine plumes with and without seaward sloping bottom are studied by use of a three-dimensional, primitive-equation model. Inside the estuary, discussion is focused on how the ...

Shenn-Yu Chao

1988-01-01T23:59:59.000Z

493

Nuclear Forces and Chiral Symmetry  

SciTech Connect

We review the main achievements of the research program for the study of nuclear forces in the framework of chiral symmetry and discuss some problems which are still open.

Renato Higa; Manoel Robilotta; Carlos Antonio da Rocha

2005-07-26T23:59:59.000Z

494

Is Gravity an Entropic Force?  

E-Print Network (OSTI)

The remarkable connections between gravity and thermodynamics seem to imply that gravity is not fundamental but emergent, and in particular, as Verlinde suggested, gravity is probably an entropic force. In this paper, we will argue that the idea of gravity as an entropic force is debatable. It is shown that there is no convincing analogy between gravity and entropic force in Verlinde's example. Neither holographic screen nor test particle satisfies all requirements for the existence of entropic force in a thermodynamics system. Furthermore, we show that the entropy increase of the screen is not caused by its statistical tendency to increase entropy as required by the existence of entropic force, but in fact caused by gravity. Therefore, Verlinde's argument for the entropic origin of gravity is problematic. In addition, we argue that the existence of a minimum size of spacetime, together with the Heisenberg uncertainty principle in quantum theory, may imply the fundamental existence of gravity as a geometric property of spacetime. This may provide a further support for the conclusion that gravity is not an entropic force.

Shan Gao

2010-02-13T23:59:59.000Z

495

FAQS Job Task Analyses - Safeguards and Security General Technical Base |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safeguards and Security General Technical Safeguards and Security General Technical Base FAQS Job Task Analyses - Safeguards and Security General Technical Base FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies. FAQS JTA - Safeguards and Security General Technical Base More Documents & Publications FAQS Qualification Card - Safeguards and Security General Technical Base FAQS Qualification Card - Safeguards and Security FAQS Job Task Analyses - Safeguards and Security

496

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

497

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

498

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

499

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields are produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap. 11 figs.

Bacon, L.D.; Ballard, W.P.; Clark, M.C.; Marder, B.M.

1987-05-19T23:59:59.000Z

500

Casimir forces beyond the proximity approximation  

E-Print Network (OSTI)

The proximity force approximation (PFA) relates the interaction between closely spaced, smoothly curved objects to the force between parallel plates. Precision experiments on Casimir forces necessitate, and spur research ...

Bimonte, G.