Powered by Deep Web Technologies
Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Optimizing Storages for Transmission System Operation  

Science Journals Connector (OSTI)

Abstract A growing amount of congestions is expected for future operation of electrical transmission grids in Europe. Within this context, storages can be used to assist transmission system operators in daily operation and to avoid costly redispatch measures. In this paper, a research methodology to evaluate impact and interdependencies between market operation of storages and participation in redispatch measures is presented. Furthermore, a methodology for the evaluation of benefits by storages solely administrated by TSO is introduced. The methods are evaluated in a case study for the German electricity system in the year 2020.

Jonas Eickmann; Tim Drees; Jens D. Sprey; Albert Moser

2014-01-01T23:59:59.000Z

2

1 Introduction Danish transmission system operator  

E-Print Network [OSTI]

a new 400 kV transmission line between the cities Aarhus and Aalborg, app 90 km. This line at the 150 kV transmission level and intended to be used at 400 kV more than just for this line. Can of the dynamic behavior of a shunt reactor compensated 400 kV combined cable/overhead line. This is accomplished

Bak, Claus Leth

3

1 Introduction Danish transmission system operator  

E-Print Network [OSTI]

400 kV transmission line between the cities Aarhus and Aalborg, app. 90 km. This line is constructed reactor compensated 400 kV combined cable/overhead line. This is accomplished by means of theoretical-phase autoreclosure ARC in such a combined cable/OHL line. Keywords -- 400 kV cable, single-phase autoreclosure, shunt

Bak, Claus Leth

4

Midwest Independent Transmission System Operator Smart Grid Project | Open  

Open Energy Info (EERE)

Operator Smart Grid Project Operator Smart Grid Project Jump to: navigation, search Project Lead Midwest Independent Transmission System Operator Country United States Headquarters Location Carmel, Indiana Additional Benefit Places Iowa, Illinois, Michigan, Minnesota, Missouri, Montana, North Dakota, Ohio, Pennsylvania, South Dakota, Wisconsin Recovery Act Funding $17,271,738.00 Total Project Value $34,543,476.00 Coverage Area Coverage Map: Midwest Independent Transmission System Operator Smart Grid Project Coordinates 39.978371°, -86.1180435° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

5

EA-1982: Parker-Davis Transmission System Programmatic Operations...  

Energy Savers [EERE]

on Western's Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance...

6

Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator  

Broader source: Energy.gov [DOE]

Supplemental comments of the Midwest Independent Transmission System Operaton on the application from International Transmission Company to construct, operate, and maintain electric transmission...

7

STEPS TO ESTABLISH A REAL-TIME TRANSMISSION MONITORING SYSTEM FOR TRANSMISSION OWNERS AND OPERATORS WITHIN THE  

Broader source: Energy.gov (indexed) [DOE]

STEPS TO ESTABLISH A REAL-TIME TRANSMISSION MONITORING STEPS TO ESTABLISH A REAL-TIME TRANSMISSION MONITORING SYSTEM FOR TRANSMISSION OWNERS AND OPERATORS WITHIN THE EASTERN AND WESTERN INTERCONNECTIONS A REPORT TO CONGRESS PURSUANT TO SECTION 1839 OF THE ENERGY POLICY ACT OF 2005 Prepared by United States Department of Energy & Federal Energy Regulatory Commission February 3, 2006 Report to Congress Joint Report by the Department of Energy and Federal Energy Regulatory Commission on Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western Interconnections February 2006 Executive Summary In August 2003, an electrical outage in one state precipitated a cascading blackout across seven other states and as far north as a province in Canada, leaving more than 50 million

8

EA-1982: Parker-Davis Transmission System Programmatic Operations and Maintenance Project; Arizona, California, and Nevada  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Westerns Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

9

On the Efficiency of the New York Independent System Operator Market for Transmission  

E-Print Network [OSTI]

-8061, USA, Chris Marnay, Staff Scientist, Electricity Market Studies, Environmental Energy Technologies 947208061, USA.; Emily S. Bartholomew, Senior Research Associate, Electricity Market Studies, EnvironmentalOn the Efficiency of the New York Independent System Operator Market for Transmission Congestion

10

EMTP modeling of CIGRE benchmark based HVDC transmission system operating with weak AC systems  

SciTech Connect (OSTI)

An EMTP based study of a CIGRE benchmark based HVDC system operating with weak ac systems is carried out. The modeled system provides a starting point for (a) educators teaching HVDC transmission courses and (b) for utility planners to develop their own low-cost dedicated digital simulators for training purposes. In this paper, modeling details of the ac-dc system, dc converters and control are presented. To validate the control schemes presented, the HVDC system is tested under ac-dc fault conditions. Results obtained from an EMTP-based study under these fault conditions are also presented in this paper.

Sood, V.K. [Hydro-Quebec, Varennes, Quebec (Canada); Khatri, V.; Jin, H. [Concordia Univ., Montreal, Quebec (Canada). Dept. of Electrical and Computer Engineering

1995-12-31T23:59:59.000Z

11

Impact of Utility-Scale Distributed Wind on Transmission-Level System Operations  

SciTech Connect (OSTI)

This report presents a new renewable integration study that aims to assess the potential for adding distributed wind to the current power system with minimal or no upgrades to the distribution or transmission electricity systems. It investigates the impacts of integrating large amounts of utility-scale distributed wind power on bulk system operations by performing a case study on the power system of the Independent System Operator-New England (ISO-NE).

Brancucci Martinez-Anido, C.; Hodge, B. M.

2014-09-01T23:59:59.000Z

12

EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Plan  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Westerns Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

13

Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bulk Electric Power Systems: Bulk Electric Power Systems: Operations and Transmission Planning Volume 4 of 4 Volume 2 PDF Volume 3 PDF Volume 1 PDF Volume 4 PDF NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable Energy Laboratory Baldwin, S. U.S. Department of Energy DeMeo, E. Renewable Energy Consulting Services, Inc. Reilly, J.M. Massachusetts Institute of Technology Mai, T. National Renewable Energy Laboratory Arent, D. Joint Institute for Strategic Energy Analysis Porro, G. National Renewable Energy Laboratory Meshek, M. National Renewable Energy Laboratory Sandor, D. National Renewable

14

Analysis of operations and cyber security policies for a system of cooperating Flexible Alternating Current Transmission System (FACTS) devices.  

SciTech Connect (OSTI)

Flexible Alternating Current Transmission Systems (FACTS) devices are installed on electric power transmission lines to stabilize and regulate power flow. Power lines protected by FACTS devices can increase power flow and better respond to contingencies. The University of Missouri Rolla (UMR) is currently working on a multi-year project to examine the potential use of multiple FACTS devices distributed over a large power system region in a cooperative arrangement in which the FACTS devices work together to optimize and stabilize the regional power system. The report describes operational and security challenges that need to be addressed to employ FACTS devices in this way and recommends references, processes, technologies, and policies to address these challenges.

Phillips, Laurence R.; Tejani, Bankim; Margulies, Jonathan; Hills, Jason L.; Richardson, Bryan T.; Baca, Micheal J.; Weiland, Laura

2005-12-01T23:59:59.000Z

15

Reliability analysis of urban gas transmission and distribution system based on FMEA and correlation operator  

Science Journals Connector (OSTI)

In order to improve the safety management of urban gas transmission and distribution system, failure mode and effects analysis (FMEA) was used to construct the reliability analysis ... the risk priority number (R...

Su Li; Weiguo Zhou

2014-12-01T23:59:59.000Z

16

Transmission and Storage Operations  

Energy Savers [EERE]

to see minimal to none in static or dynamic mode) - Rates are dependent on size, mechanical wear and operating pressures * PM * PdM 5 Methane Release Reduction Can the gas be...

17

Audio Transmission Systems  

Science Journals Connector (OSTI)

Audio transmission systems are the means by which audio signals are routed, processed, and assigned to the desired monitor and recording output channels. In the early days of electrical recording, rarely more ...

John Eargle

1986-01-01T23:59:59.000Z

18

Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning  

SciTech Connect (OSTI)

The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).

Milligan, M.; Ela, E.; Hein, J.; Schneider, T.; Brinkman, G.; Denholm, P.

2012-06-01T23:59:59.000Z

19

DOE Transmission System Integration Workshop  

Broader source: Energy.gov (indexed) [DOE]

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

20

Electric Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery...

22

Downhole Data Transmission System  

DOE Patents [OSTI]

A system for transmitting data through a string of downhole components. In one aspect, the system includes first and second magnetically conductive, electrically insulating elements at both ends of the component. Each element includes a first U-shaped trough with a bottom, first and second sides and an opening between the two sides. Electrically conducting coils are located in each trough. An electrical conductor connects the coils in each component. In operation, a varying current applied to a first coil in one component generates a varying magnetic field in the first magnetically conductive, electrically insulating element, which varying magnetic field is conducted to and thereby produces a varying magnetic field in the second magnetically conductive, electrically insulating element of a connected component, which magnetic field thereby generates a varying electrical current in the second coil in the connected component.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT)

2003-12-30T23:59:59.000Z

23

Direct current power transmission systems  

SciTech Connect (OSTI)

This book represents text on HVDC transmission available. It deals with the various aspects of the state of the art in HVDC transmission technology. This book presents many aspects of interactions of AC/DC systems. Modeling and analysis of DC systems are also discussed in detail.

Padiyar, K.R.

1991-01-01T23:59:59.000Z

24

Hydrogen Delivery Technologies and Systems- Pipeline Transmission of Hydrogen  

Broader source: Energy.gov [DOE]

Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen. Design and operations standards and materials for hydrogen and natural gas pipelines.

25

Methods and systems for micro transmissions  

DOE Patents [OSTI]

Methods and systems for micro transmissions for a micro machine may comprise an input shaft assembly coupled to a micro actuator, an output shaft assembly coupled to a micro shaft, and one or more power conversion elements operable to convert a first type of movement from the micro actuator into a second, disparate type of movement for the micro shaft.

Stalford, Harold L

2014-12-23T23:59:59.000Z

26

Abstract--The seven Independent System Operators and Regional Transmission Organizations (ISO/RTOs) in the United  

E-Print Network [OSTI]

and its development. The two settlement energy market, ancillary services and reliability pricing market, energy market operation, outage coordination, transactions settlement, billing and collections, risk in recent years. This paper shows how PJM plays essential roles in managing and improving flow of energy

McCalley, James D.

27

Category:Smart Grid Projects - Electric Transmission Systems | Open Energy  

Open Energy Info (EERE)

Transmission Systems category. Transmission Systems category. Pages in category "Smart Grid Projects - Electric Transmission Systems" The following 10 pages are in this category, out of 10 total. A American Transmission Company LLC II Smart Grid Project American Transmission Company LLC Smart Grid Project D Duke Energy Carolinas, LLC Smart Grid Project E Entergy Services, Inc. Smart Grid Project I ISO New England, Incorporated Smart Grid Project M Midwest Energy Inc. Smart Grid Project Midwest Independent Transmission System Operator Smart Grid Project N New York Independent System Operator, Inc. Smart Grid Project P PJM Interconnection, LLC Smart Grid Project W Western Electricity Coordinating Council Smart Grid Project Retrieved from "http://en.openei.org/w/index.php?title=Category:Smart_Grid_Projects_-_Electric_Transmission_Systems&oldid=214227

28

Downhole Data Transmission System  

DOE Patents [OSTI]

A system for transmitting data through a string of down-hole components. In accordance with one aspect, the system includes a plurality of downhole components, such as sections of pipe in a drill string. Each downhole component includes a pin end and a box end, with the pin end of one downhole component being adapted to be connected to the box end of another. Each pin end includes external threads and an internal pin face distal to the external threads. Each box end includes an internal shoulder face with internal threads distal to the internal shoulder face. The internal pin face and the internal shoulder face are aligned with and proximate each other when the pin end of the one component is threaded into a box end of the other component.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT)

2004-04-06T23:59:59.000Z

29

Career Map: Power Systems/Transmission Engineer  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Power Systems and Transmission Engineer positions.

30

DOE Electricity Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

31

Abstract --Under a context of transmission open access, a methodology to define a common transmission trunk system  

E-Print Network [OSTI]

Terms--Transmission systems, Transmission pricing, Cooperative games, Shapley value, Transmission open

Catholic University of Chile (Universidad Católica de Chile)

32

Some operating features of a 100,000-volt transmission  

E-Print Network [OSTI]

of the thesis - - - - - - Page 2. (2) Introductory description of line - - - Page 5* A* Stations in operation, B. Plan and profile of route, C. Mechanical construction. D. Mechanical weakness of line - - - Paige 10. a^ Excessive lengths of spans. b... Superstructure Denver Substation - 7 Profile of the Transmission Line 8a Plan of the Transmission Line - - - - - 8b Transmission Line at Hell Gate - - - - - 11 Sleet on the Argentine Crest Tower 13 Tower Crushed by Snow Slide - - - - - 13 Curve of Sparking...

Jones, Raymond

1914-03-17T23:59:59.000Z

33

Definition: Transmission Line Monitoring System | Open Energy Information  

Open Energy Info (EERE)

Monitoring System Monitoring System Jump to: navigation, search Dictionary.png Transmission Line Monitoring System Hardware, software, including sensors for voltage, current, temperature, mechanical load, wind speed, or other electrical or environmental parameters, including synchrophasors. These systems are designed to provide precise information that determine the operating conditions and ratings of transmission lines. Such a system can monitor line conditions and alert grid operators of trouble.[1] Related Terms transmission lines, transmission line References ↑ https://www.smartgrid.gov/category/technology/transmission_line_monitoring_system [[Ca LikeLike UnlikeLike You like this.Sign Up to see what your friends like. tegory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid,

34

Mission Operations & Data Systems  

E-Print Network [OSTI]

Mission Operations & Data Systems The LASP Mission Operations & Data Systems (MO&DS) group staffs and instruments. Operational software acts like the health systems in a body, ensuring that temperature, energy. The software monitors the health of on-board systems; anything unusual is flagged and sent to mission operators

Mojzsis, Stephen J.

35

GOOS OPERATIONS: SEAS TRANSMISSIONS Report Date: OCT 2007  

E-Print Network [OSTI]

GOOS OPERATIONS: SEAS TRANSMISSIONS Report Date: OCT 2007 GOOS Operations: XBT Program PDF file ship-by-ship detail of real-time mode XBT observations transmitted via SEAS: Ship Name Call sign Route 0 0 0 0 0 0 1 TOTAL 753 1405595 10511207 554 964 910 1038593 859 134911265 #12;Line-by-line details

36

Operations Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Standards BPA Operations Information (OPI) Transmission Services operates and plans for regional and national system needs. Transmission Services coordinates system operation and...

37

Electric Transmission Line Flashover Prediction System  

E-Print Network [OSTI]

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

38

Safety of Gas Transmission and Distribution Systems (Maine) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Safety of Gas Transmission and Distribution Systems (Maine) Safety of Gas Transmission and Distribution Systems (Maine) Safety of Gas Transmission and Distribution Systems (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Maine Program Type Safety and Operational Guidelines Provider Public Utilities Commission These regulations describe requirements for the participation of natural gas utilities in the Underground Utility Damage Prevention Program,

39

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Technologies and Systems Pipeline Transmission of Hydrogen Strategic Initiatives for Hydrogen Delivery Workshop May 7- 8, 2003 U.S. Department of Energy Hydrogen, Fuel Cells,...

40

EIS-0285: Transmission System Vegetation Management Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

285: Transmission System Vegetation Management Program 285: Transmission System Vegetation Management Program EIS-0285: Transmission System Vegetation Management Program SUMMARY Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure I-1). The seven states offer a great diversity of vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and neighboring members of the public, and interfere with our ability to maintain these facilities. We need to keep vegetation a safe distance away from our electric power facilities and control noxious weeds at our

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Operating System Resource Management  

E-Print Network [OSTI]

Operating System Resource Management Date: Monday, September 27, 2010 Time: 2:00 ­ 3:00 pm Location allocation and de-allocation by an operating system of processor cores, memory pages, and various types constrained. This talk will propose a scheme for addressing the operating system resource management problem

42

Optimal Operating Frequency in Wireless Power Transmission for Implantable Devices  

E-Print Network [OSTI]

Optimal Operating Frequency in Wireless Power Transmission for Implantable Devices Ada S. Y. Poon, Stephen O'Driscoll, and Teresa H. Meng Abstract-- This paper examines short-range wireless power- ing run on power levels ranging from 10 µW to 1 mW. However, the wireless interface for both power

Poon, Ada

43

Midwest Independent System Operator (Multiple States) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Independent System Operator (Multiple States) Independent System Operator (Multiple States) Midwest Independent System Operator (Multiple States) < Back Eligibility Developer Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Montana Program Type Interconnection Provider Midwest Independent System Operator Midwest Independent Transmission System Operator (MISO) is a Regional Transmission Organization, which administers wholesale electricity markets in all or parts of 11 U.S. states and the Canadian province of Manitoba. MISO administers electricity transmission grids across the Midwest and into Canada, and provides tools, transmission planning strategies, and integration for utilities in those markets.

44

Exposure to transmission line electric fields during farming operations  

SciTech Connect (OSTI)

This paper describes an analysis of exposure to transmission line electric fields during typical farming operations. This analysis makes use of experimentally determined ''activity factors'' and time budget information for typical farms as compiled by the U.S. Department of Agriculture. A detailed exposure assessment for 18 ''typical farms'' (as defined by USDA) is provided for a base case 345 kV design. Exposure estimates for transmission lines ranging from 115-765 kV are provided for a representative farm.

Silva, M.; Huber, D.

1985-09-01T23:59:59.000Z

45

Development of Operation System  

Science Journals Connector (OSTI)

We are gradually developing a total hospital information system known as GUNMAS (Gunma University Network for Medical-Hospital- Information Archiving System). an operation system is also being developed as part o...

Seiji Kato M.D.; Yasuharu Kitani M.D.

1992-01-01T23:59:59.000Z

46

Steps to Establish a Real-Time Transmission Monitoring System for  

Broader source: Energy.gov (indexed) [DOE]

Steps to Establish a Real-Time Transmission Monitoring System for Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western Interconnections Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western Interconnections Steps to establish a real-time transmission monitoring system for transmission owners and operators within the Eastern and Western interconnections: a report to congress pursuant to section 1839 of the Energy Policy Act of 2005. Section 1839 of the Energy Policy Act of 2005 (EPAct 2005) directs the Secretary of Energy (DOE) and the Federal Energy Regulatory Commission (Commission) to study and report to Congress on the steps that must be taken to establish a system to make available to all transmission owners

47

Enhanced Geothermal Systems (EGS) with CO2as Heat Transmission Fluid  

Broader source: Energy.gov [DOE]

The overall objective of the research is to explore the feasibility of operating enhanced geothermal systems (EGS) with CO2as heat transmission fluid.

48

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

SciTech Connect (OSTI)

California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

2008-07-01T23:59:59.000Z

49

Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Technologies and Technologies and Systems Pipeline Transmission of Hydrogen Strategic Initiatives for Hydrogen Delivery Workshop May 7- 8, 2003 U.S. Department of Energy ■ Hydrogen, Fuel Cells, and Infrastructure Technologies Program Pipeline Transmission of Hydrogen --- 2 Copyright: Design & Operation Standards Relevant Design and Operating Standards ANSI/ASME B31.8 49 CFR 192 CGA H 2 Pipeline Standard (in development) Pipeline Transmission of Hydrogen --- 3 Copyright: Future H 2 Infrastructure Wind Powered Electrolytic Separation Local Reformers Users Stationary Power Sources Vehicle Fueling Stations Distance from Source to User (Miles) <500 0-5 <2,000 <50 Off-peak Hydroelectric Powered Electrolytic Separation Large Reformers (scale economies) Pipeline Transmission of Hydrogen

50

Formal Specification of Operating System Operations  

E-Print Network [OSTI]

Formal Specification of Operating System Operations Dan Zhou Department of Computer Science.black@nist.gov This paper describes the development of a formal specification for a secure operating system architecture operations. We also provide a uniform environment for system commands that change the security state

Black, Paul E.

51

Cryogenic System for a High Temperature Superconducting Power Transmission Cable  

SciTech Connect (OSTI)

High-temperature superconducting (HTS) cable systems for power transmission are under development that will use pressurized liquid nitrogen to provide cooling of the cable and termination hardware. Southwire Company and Oak Ridge National Laboratory have been operating a prototype HTS cable system that contains many of the typical components needed for a commercial power transmission application. It is being used to conduct research in the development of components and systems for eventual commercial deployment. The cryogenic system was built by Air Products and Chemicals, Allentown, Pennsylvania, and can circulate up to 0.35 kg/s of liquid nitrogen at temperatures as low as 67 K at pressures of 1 to 10 bars. Sufficient cooling is provided for testing a 5-m-long HTS transmission cable system that includes the terminations required for room temperature electrical connections. Testing of the 5-m HTS transmission cable has been conducted at the design ac conditions of 1250 A and 7.5 kV line to ground. This paper contains a description of the essential features of the HTS cable cryogenic system and performance results obtained during operation of the system. The salient features of the operation that are important in large commercial HTS cable applications will be discussed.

Demko, J.A.; Gouge, M.J.; Hughey, R.L.; Lue, J.W.; Martin, R.; Sinha, U.; Stovall, J.P.

1999-07-12T23:59:59.000Z

52

Reliability modeling and evaluation of HVDC power transmission systems  

SciTech Connect (OSTI)

The objective of this paper is to present an improved computational method for evaluating the reliability indices of HVdc transmission systems. The developed models and computational techniques are described. These can be used to simulate the operational practices and characteristics of a system under study efficiently and realistically. This method is based on the failure modes and effects analysis and uses the event tree method and the minimal cut set approach to represent the system's operational behavior and deduce the appropriate system's failure modes. A set of five reliability indices is evaluated for each output node being analyzed together with the probability and frequency of encountering particular regions of system performance levels. The analysis of an assumed HVdc bipolar transmission system is also included.

Dialynas, E.N.; Koskolos, N.C. (National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering)

1994-04-01T23:59:59.000Z

53

Comparing rig power transmission systems  

SciTech Connect (OSTI)

Installed power on drilling rigs has increased steadily since the inception of rotary drilling technology as a result of technical advances and the need to penetrate deeper horizons. Higher power levels for the pumps, rotary table and drawworks are also required for drilling deep wells within an economically reasonable period. Power initially available on a rig had been about 35 kW on average, whereas power values on modern rigs drilling ultra-deep wells are on the order of several thousand kW. The installed power values on modern drilling rigs, subdivided with respect to depth range, are shown. After safety, economic factors are of paramount importance to rig operators. Among these, which include low acquisition cost, long service life and ease of maintenance, a particularly decisive factor is high efficiency.

Gutsche, W.; Noevig, T.

1989-04-01T23:59:59.000Z

54

EIS-0285: Transmission System Vegetation Management Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

February 20, 2003 February 20, 2003 EIS-0285-SA-123: Supplement Analysis Transmission System Vegetation Management Program February 19, 2003 EIS-0285-SA-126: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-125: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-124: Supplement Analysis Transmission System Vegetation Management Program February 12, 2003 EIS-0285-SA-121: Supplement Analysis Transmission System Vegetation Management Program February 10, 2003 EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington January 16, 2003 EIS-0285-SA-117: Supplement Analysis Transmission System Vegetation Management Program December 24, 2002

55

EIS-0285: Transmission System Vegetation Management Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

July 19, 2002 July 19, 2002 EIS-0285-SA-96: Supplement Analysis Transmission System Vegetation Management Program, Snohomish District Substations July 19, 2002 EIS-0285-SA-70: Supplement Analysis Transmission System Vegetation Management Program July 9, 2002 EIS-0285-SA-81: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-84: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-80: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-78: Supplement Analysis Transmission System Vegetation Management Program June 21, 2002 EIS-0285-SA-75: Supplement Analysis Transmission System Vegetation Management Program May 31, 2002 EIS-0285-SA-58: Supplement Analysis

56

Steps to Establish a Real-Time Transmission Monitoring System...  

Broader source: Energy.gov (indexed) [DOE]

that must be taken to establish a system to make available to all transmission owners and Regional Transmission Organizations (RTOs) within the Eastern and Western Interconnections...

57

Downhole transmission system comprising a coaxial capacitor  

DOE Patents [OSTI]

A transmission system in a downhole component comprises a plurality of data transmission elements. A coaxial cable having an inner conductor and an outer conductor is disposed within a passage in the downhole component such that at least one capacitor is disposed in the passage and having a first terminal coupled to the inner conductor and a second terminal coupled to the outer conductor. Preferably the transmission element comprises an electrically conducting coil. Preferably, within the passage a connector is adapted to electrically connect the inner conductor of the coaxial cable and the lead wire. The coaxial capacitor may be disposed between and in electrically communication with the connector and the passage. In another embodiment a connector is adapted to electrical connect a first and a second portion of the inner conductor of the coaxial cable and a coaxial capacitor is in electrical communication with the connector and the passage.

Hall, David R. (Provo, UT); Pixton, David S. (Lehi, UT); Johnson, Monte L. (Orem, UT); Bartholomew, David B. (Springville, UT); Hall, Jr., H. Tracy (Provo, UT); Rawle, Michael (Springville, UT)

2011-05-24T23:59:59.000Z

58

Data transmission system with distributed microprocessors  

DOE Patents [OSTI]

A data transmission system having a common request line and a special request line in addition to a transmission line. The special request line has priority over the common request line. A plurality of node stations are multi-drop connected to the transmission line. Among the node stations, a supervising station is connected to the special request line and takes precedence over other slave stations to become a master station. The master station collects data from the slave stations. The station connected to the common request line can assign a master control function to any station requesting to be assigned the master control function within a short period of time. Each station has an auto response control circuit. The master station automatically collects data by the auto response controlling circuit independently of the microprocessors of the slave stations.

Nambu, Shigeo (Fuchu, JP)

1985-01-01T23:59:59.000Z

59

Single transmission line data acquisition system  

DOE Patents [OSTI]

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

Fasching, George E. (Morgantown, WV)

1984-01-01T23:59:59.000Z

60

Understanding Cognitive and Collaborative Work: Observations in an Electric Transmission Operations Control Center  

SciTech Connect (OSTI)

This paper describes research that is part of an ongoing project to design tools to assist in the integration of renewable energy into the electric grid. These tools will support control room dispatchers in real-time system operations of the electric power transmission system which serves much of the Western United States. Field observations comprise the first phase of this research in which 15 operators have been observed over various shifts and times of day for approximately 90 hours. Findings describing some of the cognitive and environmental challenges of managing the dynamically changing electric grid are presented.

Obradovich, Jodi H.

2011-09-30T23:59:59.000Z

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Complex dynamics of blackouts in power transmission systems  

Science Journals Connector (OSTI)

In order to study the complex global dynamics of a series of blackouts in power transmission systems a dynamical model of such a system has been developed. This model includes a simple representation of the dynamical evolution by incorporating the growth of power demand the engineering response to system failures and the upgrade of generator capacity. Two types of blackouts have been identified each having different dynamical properties. One type of blackout involves the loss of load due to transmission lines reaching their load limits but no line outages. The second type of blackout is associated with multiple line outages. The dominance of one type of blackout over the other depends on operational conditions and the proximity of the system to one of its two critical points. The model displays characteristics such as a probability distribution of blackout sizes with power tails similar to that observed in real blackout data from North America.

B. A. Carreras; V. E. Lynch; I. Dobson; D. E. Newman

2004-01-01T23:59:59.000Z

62

Chapter 1: Operating System Models 1 Operating System Models  

E-Print Network [OSTI]

Chapter 1: Operating System Models 1 2 Operating System Models 2.1 Introduction Over the past several years, a number of trends affecting operating system design are witnessed and foremost among them is a move towards modularity. Operating systems such as Microsofts Windows, IBMs OS/2, C-DACs PARAS

Melbourne, University of

63

OPERATING SYSTEM CONCEPTS Avi Silberschatz  

E-Print Network [OSTI]

OPERATING SYSTEM CONCEPTS Avi Silberschatz Department of Computer Sciences University of Texas & Peter Galvin CHAPTER 1: INTRODUCTION . What is an operating system? . Early Systems . Simple Batch Systems . Distributed Systems . Real­Time Systems Operating System Concepts, Addison­Wesley ? 1994

Schmidt, Douglas C.

64

Control system and method for a power delivery system having a continuously variable ratio transmission  

DOE Patents [OSTI]

A control system and method for a power delivery system, such as in an automotive vehicle, having an engine coupled to a continuously variable ratio transmission (CVT). Totally independent control of engine and transmission enable the engine to precisely follow a desired operating characteristic, such as the ideal operating line for minimum fuel consumption. CVT ratio is controlled as a function of commanded power or torque and measured load, while engine fuel requirements (e.g., throttle position) are strictly a function of measured engine speed. Fuel requirements are therefore precisely adjusted in accordance with the ideal characteristic for any load placed on the engine.

Frank, Andrew A. (1034 Hillside Ave., Madison, WI 53705)

1984-01-01T23:59:59.000Z

65

GTO thyristor applications for HVDC transmission systems  

SciTech Connect (OSTI)

The development of a large capacity gate turn off thyristor (GTO) has made it possible to manufacture self-commutated convertors employing GTO for power applications. In this paper, conceptual designs for convertor station equipment for a HVDC transmission system employing current as well as voltage source type GTO convertors (simply referred to as VSTGC and CSTGC) are presented. The study result indicates that the VSTGC is preferable over the CSTGC. Also presented in this paper is a preliminary economic comparison between two HVDC system alternatives for applying power to a weak ac system, one employing a self-commutated GTO convertor and the other employing a combination of line-commutated convertor and a synchronous condenser. The result indicates that the two HVDC convertor station alternatives cost about the same.

Yamada, H.; Sampei, M. (Electric Power Development Co. Ltd., Tokyo (Japan)); Kashiwazaki, H.; Tanaka, C. (Hitachi Ltd., Tokyo (Japan)); Takahashi, T.; Horivchi, T. (Toshiba Corp., Tokyo (JP))

1990-07-01T23:59:59.000Z

66

Low pressure electrospray ionization system and process for effective transmission of ions  

DOE Patents [OSTI]

Systems and methods that provide up to complete transmission of ions between coupled stages with low effective ion losses. An "interfaceless" electrospray ionization system is further described that operates an electrospray at a reduced pressure such that standard electrospray sample solutions can be directly sprayed into an electrodynamic ion funnel which provides ion focusing and transmission of ions into a mass analyzer. Furthermore, chambers maintained at different pressures can allow for more optimal operating conditions for an electrospray emitter and an ion guide.

Tang, Keqi (Richland, WA); Page, Jason S (Kennewick, WA); Kelly, Ryan T (West Richland, WA); Smith, Richard D (Richland, WA)

2012-05-08T23:59:59.000Z

67

DOE Action Plan Addressing the Electricity Transmission System  

Broader source: Energy.gov (indexed) [DOE]

U.S. DEPARTMENT OF ENERGY U.S. DEPARTMENT OF ENERGY ACTION PLAN ADDRESSING THE ELECTRICITY TRANSMISSION SYSTEM ~DRAFT~ DOE Action Plan Addressing the Electricity Transmission System 1 Table of Contents * INTRODUCTION ................................................................................................................... 2 The Grid Tech Team ...................................................................................................... 2 Focus on Transmission .................................................................................................. 3 Roadmap Goals ............................................................................................................. 4 * PROCESS OVERVIEW ........................................................................................................... 5

68

Multi-transmission-line-beam interactive system  

SciTech Connect (OSTI)

We construct here a Lagrangian field formulation for a system consisting of an electron beam interacting with a slow-wave structure modeled by a possibly non-uniform multiple transmission line (MTL). In the case of a single line we recover the linear model of a traveling wave tube due to J. R. Pierce. Since a properly chosen MTL can approximate a real waveguide structure with any desired accuracy, the proposed model can be used in particular for design optimization. Furthermore, the Lagrangian formulation provides: (i) a clear identification of the mathematical source of amplification, (ii) exact expressions for the conserved energy and its flux distributions obtained from the Noether theorem. In the case of uniform MTLs we carry out an exhaustive analysis of eigenmodes and find sharp conditions on the parameters of the system to provide for amplifying regimes.

Figotin, Alexander; Reyes, Guillermo [Department of Mathematics, University of California at Irvine, Irvine, California 92697-3875 (United States)] [Department of Mathematics, University of California at Irvine, Irvine, California 92697-3875 (United States)

2013-11-15T23:59:59.000Z

69

Multi-transmission-line-beam interactive system  

E-Print Network [OSTI]

We construct here a Lagrangian field formulation for a system consisting of an electron beam interacting with a slow-wave structure modeled by a possibly non-uniform multiple transmission line (MTL). In the case of a single line we recover the linear model of a traveling wave tube (TWT) due to J.R. Pierce. Since a properly chosen MTL can approximate a real waveguide structure with any desired accuracy, the proposed model can be used in particular for design optimization. Furthermore, the Lagrangian formulation provides for: (i) a clear identification of the mathematical source of amplification, (ii) exact expressions for the conserved energy and its flux distributions obtained from the Noether theorem. In the case of uniform MTLs we carry out an exhaustive analysis of eigenmodes and find sharp conditions on the parameters of the system to provide for amplifying regimes.

Alexander Figotin; Guillermo Reyes

2013-04-19T23:59:59.000Z

70

Network Operating Systems Partha Dasgupta  

E-Print Network [OSTI]

Network Operating Systems Partha Dasgupta Department of Computer Science and Engineering Arizona of Electrical Engineering] 1. Introduction Network Operating Systems extend the facilities and services provided by computer operating systems to support a set of computers, connected by a network. The environment managed

Dasgupta, Partha

71

Boost type PWM HVDC transmission system  

SciTech Connect (OSTI)

This paper reports that conventional HVdc is built around the mercury arc rectifier or the thyristor which requires line commutation. The advances of fast, high power GTO's and future devices such as MCT's with turn off capabilities, are bringing PWM techniques within the range of HVdc applications. By combining PWM techniques to the boost type bridge topology, one has an alternate system of HVdc Transmission. On the ac side, the converter station has active controls over: the voltage amplitude, the voltage angle and the frequency. On the dc side, parallel connections facilitate multi-terminal load sharing by simple local controls so that redundant communication channels are not required. Bidirectional power through each station is accomplished by the reversal of the direction of dc current flow. These claims have been substantiated by experimental results from laboratory size multi-terminal models.

Ooi, B.T.; Wang, X. (McGill Univ., Montreal, PQ (Canada). Dept. of Electrical Engineering)

1991-10-01T23:59:59.000Z

72

Decision-Support Software for Grid Operators: Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation  

SciTech Connect (OSTI)

GENI Project: The CRA team is developing control technology to help grid operators more actively manage power flows and integrate renewables by optimally turning on and off entire power lines in coordination with traditional control of generation and load resources. The control technology being developed would provide grid operators with tools to help manage transmission congestion by identifying the facilities whose on/off status must change to lower generation costs, increase utilization of renewable resources and improve system reliability. The technology is based on fast optimization algorithms for the near to real-time change in the on/off status of transmission facilities and their software implementation.

None

2012-03-16T23:59:59.000Z

73

Transmission Considerations for Market Operation: U.S. Design (Presentation)  

SciTech Connect (OSTI)

Presented at the Utility Wind Integration Group (UWIG) Workshop on Market Design and Operation With Variable Renewables, 22 June 2011, Fredericia, Denmark. This presentation provides an overview of the present U.S. electricity market, how it operates, and some solutions for improving its operation, cost accounting, and integration of renewable power resources.

Ela, E.

2011-06-01T23:59:59.000Z

74

Operating System Resource Burton Smith  

E-Print Network [OSTI]

Operating System Resource Management Burton Smith Technical Fellow Microsoft Corporation #12;Background · Resource Management (RM) is a primary operating system responsibility ­ It lets competing applications share a system · Client RM in particular faces new challenges ­ Increasing numbers of cores

75

Low pressure electrospray ionization system and process for effective transmission of ions  

DOE Patents [OSTI]

A system and method are disclosed that provide up to complete transmission of ions between coupled stages with low effective ion losses. A novel "interfaceless" electrospray ionization system is further described that operates the electrospray at a reduced pressure such that standard electrospray sample solutions can be directly sprayed into an electrodynamic ion funnel which provides ion focusing and transmission of ions into a mass analyzer.

Tang, Keqi (Richland, WA); Page, Jason S. (Kennewick, WA); Kelly, Ryan T. (Wet Richland, WA); Smith, Richard D. (Richland, WA)

2010-03-02T23:59:59.000Z

76

American Transmission Systems Inc | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 56162 Utility Location Yes Ownership T NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Transmission Yes This article is a...

77

Radio frequency communication system utilizing radiating transmission lines  

DOE Patents [OSTI]

A radio communication system for use in tunnels, mines, buildings or other shielded locations in which a pair of radiating transmission lines (30), (31) extend through such location in spaced coextensive relation to each other. Each transmission line (30), (31) has at least one unidirectional amplifier (32), (33) interposed therein with the sense of the unidirectional amplifier (32) of one transmission line (30) being opposite to the sense of the unidirectional amplifier (33) of the other transmission line (31). Each of the amplifiers (32), (33) has a gain which is less than the coupling loss between the transmission lines (30), (31). Two or more mobile transceivers (35) in the location served by the system are coupled to the transmission lines (30), (31) by electromagnetic wave propagation in space in order to communicate directly with each other at a given radio frequency within the frequency range of the system.

Struven, Warren C. (San Carlos, CA)

1984-01-01T23:59:59.000Z

78

The Economic Case for Bulk Energy Storage in Transmission Systems  

E-Print Network [OSTI]

The Economic Case for Bulk Energy Storage in Transmission Systems with High Percentages to Engineer the Future Electric Energy System #12;#12;The Economic Case for Bulk Energy Storage Economic Case for Bulk Energy Storage in Transmission Sys- tems with High Percentages of Renewable

79

Operating Systems Introduction  

E-Print Network [OSTI]

by the environment" 4 Introduction (2) ¿ Examples of real-time systems: ¿ plant control ¿ control of production systems ¿ space missions ¿ household appliances ¿ virtual / augmented reality #12;3 5 Introduction (3 of application: ¿ Automotive: · power-train control, air-bag control, steer by wire, brake by wire ¿ Aircraft

Bogliolo, Alessandro

80

The Reliability Investigation on ACSR Splice Connector Systems Used in Overhead Power transmission Lines  

SciTech Connect (OSTI)

Due to material discontinuity and inherited forming mechanism from a crimped-type splice connector, the associated conductor-connector system is highly sensitive to system components aging, especially during high-temperature operations. Furthermore, due to the increase in power demand and limited investment in new infrastructure, existing overhead power transmission lines often need to operate at temperatures higher than the original designed values. This has led to the accelerated aging and degradation of conductor-connector systems. The implications of connector aging are two-fold: (1) significant increase in resistivity of the splice connector and (2) significant reduction in the connector clamping strength. Therefore, splice connectors are one of the weakest links in the electric power transmission infrastructure. In this paper we will discuss the reliability of splice connector systems, including both single stage and two stage splice connectors, used in ACSR conductor of transmission lines under high temperature operations.

Wang, Jy-An John [ORNL] [ORNL; Jiang, Hao [ORNL] [ORNL; Ren, Fei [ORNL] [ORNL

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Virtual Pipeline System Testbed to Optimize the U.S. Natural Gas Transmission Pipeline System  

SciTech Connect (OSTI)

The goal of this project is to develop a Virtual Pipeline System Testbed (VPST) for natural gas transmission. This study uses a fully implicit finite difference method to analyze transient, nonisothermal compressible gas flow through a gas pipeline system. The inertia term of the momentum equation is included in the analysis. The testbed simulate compressor stations, the pipe that connects these compressor stations, the supply sources, and the end-user demand markets. The compressor station is described by identifying the make, model, and number of engines, gas turbines, and compressors. System operators and engineers can analyze the impact of system changes on the dynamic deliverability of gas and on the environment.

Kirby S. Chapman; Prakash Krishniswami; Virg Wallentine; Mohammed Abbaspour; Revathi Ranganathan; Ravi Addanki; Jeet Sengupta; Liubo Chen

2005-06-01T23:59:59.000Z

82

The design, construction, and operation of long-distance high-voltage electricity transmission technologies.  

SciTech Connect (OSTI)

This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these conductors at a safe distance from each other and from the ground and the natural and built environment. Common elements that are generally less visible (or at least more easily overlooked) include the maintained ROW along the path of the towers, access roads needed for maintenance, and staging areas used for initial construction that may be restored after construction is complete. Also visible but less common elements along the corridor may include switching stations or substations, where lines of similar or different voltages meet to transfer power.

Molburg, J. C.; Kavicky, J. A.; Picel, K. C.

2008-03-03T23:59:59.000Z

83

Unbundling ownership and control: international experience of independent system operators  

Science Journals Connector (OSTI)

As competition has been introduced into electricity markets around the world, a fundamental challenge has been how to govern the vertical relationship between the monopolistic transmission networks and the potentially competitive activities of generation and supply. An innovative solution is to allow the incumbent to retain ownership of its network but to hand over their operation to an Independent Systems Operator (ISO). In principle, this should remove the opportunity for the owner of the transmission network to discriminate against third-party suppliers. It also allows the integration of transmission networks in separate regions and under separate ownership. This paper considers the lessons of the British and US experience of the ISO model. We conclude that if the British model works, it could be applied within Germany, with the regional networks operated by a single ISO. Ultimately, these types of arrangements could also allow supranational electricity transmission markets in Europe.

Enese Lieb-Doczy; Isabelle McKenzie; David Squires

2008-01-01T23:59:59.000Z

84

Power electronics in electric utilities: HVDC power transmission systems  

SciTech Connect (OSTI)

High Voltage Direct Current (HVDC) power transmission systems constitute an important application of power electronics technology. This paper reviews salient aspects of this growing industry. The paper summarizes the history of HVDC transmission and discusses the economic and technical reasons responsible for development of HVDC systems. The paper also describes terminal design and basic configurations of HVDC systems, as well as major equipments of HVDC transmission system. In this regard, the state-of-the-art technology in the equipments constructions are discussed. Finally, the paper reviews future developments in the HVDC transmission systems, including promising technologies, such as multiterminal configurations, Gate Turn-Off (GTO) devices, forced commutation converters, and new advances in control electronics.

Nozari, F.; Patel, H.S.

1988-04-01T23:59:59.000Z

85

Integrated System Transmission and Ancillary Services Rate Calculation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Rate 10 4.00 MillsKWh (L5 * 1000) 730 hours per month 7 RATE FOR SCHEDULING, SYSTEM CONTROL AND DISPATCH SERVICE FOR 2015 A. Fixed Charge Rate 21.652% (1)...

86

THE PUSH TOWARD GRID REGIONALIZATION IN OPEN ACCESS TRANSMISSION SYSTEMS  

E-Print Network [OSTI]

THE PUSH TOWARD GRID REGIONALIZATION IN OPEN ACCESS TRANSMISSION SYSTEMS ProfessorGeorge Gross Universityof Illinois atUrbana-Champaign USA E-mail:gross@uiuc.edu ExtendedSummary Keywords:RTO, ISO

Gross, George

87

AC transmission system planning choosing lines from a discrete set  

E-Print Network [OSTI]

Transmission system planning (TSP) is a difficult nonlinear optimization problem involving non-convex quadratic terms, as well as discrete variables. We extend prior results for linear relaxations, drawing on a preliminary ...

Gilbertson, Eric W.

2013-04-24T23:59:59.000Z

88

///COUNTER : an artistic system for the transmission of cultural energy  

E-Print Network [OSTI]

My thesis introduces ///COUNTER as an artistic system for the transmission of cultural energy. The underlying concepts of ///COUNTER are derived directly from my work on energy access as developed through the eWheel and ...

Vincent de Paul, Jegan Joyston

2009-01-01T23:59:59.000Z

89

Integrating Solar PV in Utility System Operations  

E-Print Network [OSTI]

PV into Utility System Operations System Scheduling APSSolar PV into Utility System Operations and occurs at 5 p.m.Solar PV in Utility System Operations A. Mills 1 , A.

Mills, A.

2014-01-01T23:59:59.000Z

90

Transmission  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

91

WEBtop (Operating Systems on Web)  

Science Journals Connector (OSTI)

WebOS (Web based operating system) is a new form of Operating Systems. You can use your desktop as a virtual desktop on the web accessible via a browser with multiple integrated built?in applications that allow the user to easily manage and organize her data from any location. Desktop on web can be named as WEBtop. This paper starts with a introduction of WebOS and its benefits. For this paper We have reviewed some most interesting WebOS available nowadays and tried to provide a detailed description of their features. We have identified some parameters as comparison criteria among them. A technical review is given with research design and future goals to design better web based operating systems is a part of this study. Findings of the study conclude this paper.

M. K. Sharma; Rajeev Kumar

2011-01-01T23:59:59.000Z

92

Registration Contact List: Electricity Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

11/2/2012 11/2/2012 First Name Last Name Title Company Address1 Address2 City State/Province Zip Country Work Phone Sandy Aivaliotis , Valley Group, a Nexans 3A Trowbridge Drive Bethel CT 6801 United States 416-648-4382 Robert Anders Management U.S. Department of Energy / EERE Rm 6A-067 1000 Independence Ave., SW Washington DC 20585 United States 202-586-4716 Phillip Anderson g g Project Leader Idaho Power 1221 W. Idaho St. Boise ID 83702 United States 208-484-2024 Mihai Anitescu Dr. Argonne National Laboratory 9700 S Cas Avenue Argonne IL 60439 United States 16302524172 Sam Baldwin Officer USDOE/EERE 1000 Independence Ave., SW Washington DC 20585 United States 202-586-0927 Thomas Baldwin Energy Lead Idaho National Laboratory P.O. Box 1655 Idaho Falls ID 83415-3810 United States 208-526-1864 Venkat Banunarayanan g Transmission Department of Energy

93

Session 6: Systems operational performance  

E-Print Network [OSTI]

Three contributions were presented in this session: Tune and Orbit Feedbacks Performances: A User Perspective by Laurette Ponce , Beam Instrumentation Performance Overview by Mariusz Sapinski and LHC RF 2011 and beyond by Philippe Baudrenghien . This contribution recapitulates the outlooks given for 2012, the points to be followed up and the discussions originating in the Systems Operational Performance session.

Holzer, E B

2012-01-01T23:59:59.000Z

94

Wind Mills and Transmission System Interaction.  

E-Print Network [OSTI]

??This thesis report focuses on different kinds of power system disturbances and their impact on voltage profile at the point of wind power connection. The (more)

Akwarandu, John

2006-01-01T23:59:59.000Z

95

An Annotated Bibliography of High-Voltage Direct-Current Transmission and Flexible AC Transmission (FACTS) Devices, 1991-1993.  

SciTech Connect (OSTI)

References are contained for HVDC systems, converter stations and components, overhead transmission lines, cable transmission, system design and operations, simulation of high voltage direct current systems, high-voltage direct current installations, and flexible AC transmission system (FACTS).

Litzenberger, Wayne; Lava, Val

1994-08-01T23:59:59.000Z

96

Single transmission line interrogated multiple channel data acquisition system  

DOE Patents [OSTI]

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensor circuits each monitors a specific process variable and each transmits measurement values over a single transmission line to a master interrogating station when addressed by said master interrogating station. Typically, as many as 330 remote stations may be parallel connected to the transmission line which may exceed 7,000 feet. The interrogation rate is typically 330 stations/second. The master interrogating station samples each station according to a shared, charging transmit-receive cycle. All remote station address signals, all data signals from the remote stations/sensors and all power for all of the remote station/sensors are transmitted via a single continuous terminated coaxial cable. A means is provided for periodically and remotely calibrating all remote sensors for zero and span. A provision is available to remotely disconnect any selected sensor station from the main transmission line.

Fasching, George E. (Morgantown, WV); Keech, Jr., Thomas W. (Morgantown, WV)

1980-01-01T23:59:59.000Z

97

DRAFT Parker-Davis Transmission System  

Office of Environmental Management (EM)

system. 3.13.1.1 Sensitive Receptors Some land uses are considered more sensitive to air pollution than others due to the types of population groups or activities involved....

98

Tensor Products of Operator Systems Mark Tomforde  

E-Print Network [OSTI]

Tensor Products of Operator Systems Mark Tomforde (Joint work with Ali Kavruk, Vern Paulsen Tomforde (Univeristy of Houston) Tensor Products of Operator Systems October 19, 2009 1 / 37 #12;Operator Spaces and Operator Systems An operator space is a subspace of B(H). Mark Tomforde (Univeristy of Houston

Kerr, David

99

Data Transmission System For A Downhole Component  

DOE Patents [OSTI]

The invention is a system for transmitting data through a string of downhole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. Each component has a first and second end, with a first communication element located at the first end and a second communication element located at the second end. Each communication element includes a first contact and a second contact. The system also includes a coaxial cable running between the first and second communication elements, the coaxial cable having a conductive tube and a conductive core within it. The system also includes a first and second connector for connecting the first and second communication elements respectively to the coaxial cable. Each connector includes a conductive sleeve, lying concentrically within the conductive tube, which fits around and makes electrical contact with the conductive core. The conductive sleeve is electrically isolated from the conductive tube. The conductive sleeve of the first connector is in electrical contact with the first contact of the first communication element, the conductive sleeve of the second connector is in electrical contact with the first contact of the second communication element, and the conductive tube is in electrical contact with both the second contact of the first communication element and the second contact of the second communication element.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Fox, Joe (Spanish Fork, UT); Briscoe, Michael (Lehi, UT)

2005-01-18T23:59:59.000Z

100

Commutation failures in HVDC transmission systems  

SciTech Connect (OSTI)

This paper provides a formulation for the initiation or onset mechanism of commutation failures in line-commutated thyristor converters, assuming infinite (zero impedance) ac systems. A theoretical development and a parametric analysis is given. Theory validation by simulation and comparison to actual field experience data is also given.

Thio, C.V.; Davies, J.B.; Kent, K.L. [Manitoba Hydro, Winnipeg, Manitoba (Canada)] [Manitoba Hydro, Winnipeg, Manitoba (Canada)

1996-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Electricity Transmission System Workshop: EERE Issues and Opportunities  

Broader source: Energy.gov (indexed) [DOE]

Electricity Transmission System Electricity Transmission System Workshop: EERE Issues and Opportunities November 1, 2012 Dr. David Danielson Assistant Secretary for the Office of Energy Efficiency and Renewable Energy eere.energy.gov "If you can't solve a problem, expand it." - Dwight D. Eisenhower eere.energy.gov eere.energy.gov Stationary Energy Demand Transport Energy Supply Deploy Clean Electricity Deploy Alternative Hydrocarbon Fuels Modernize the Grid Electrify the Fleet Increase Building and Industrial Efficiency Increase Vehicle Efficiency Source: DOE ,Quadrennial Technology Review, September 2011 eere.energy.gov Rapid Growth in Renewable Electricity Since 2008, the U.S. has doubled renewable energy generation from wind, solar, and

102

Transmission Pricing of Distributed Multilateral Energy Transactions to Ensure System Security and Guide Economic Dispatch  

E-Print Network [OSTI]

Transmission Pricing of Distributed Multilateral Energy Transactions to Ensure System Security and Guide Economic Dispatch...

Ilic, Marija; Hsieh, Eric; Remanan, Prasad

2004-06-16T23:59:59.000Z

103

Integrating Renewable Energy into the Transmission and Distribution System  

Broader source: Energy.gov (indexed) [DOE]

Integrating Renewable Energy into the Transmission and Distribution Integrating Renewable Energy into the Transmission and Distribution System of the U.S. Virgin Islands Integrating Renewable Energy into the Transmission and Distribution System of the U.S. Virgin Islands This report describes one area in which islands may lead: integrating a high percentage of renewable energy resources into an isolated grid. In addition, it explores the challenges, feasibility, and potential benefits of interconnecting the USVI grids with the much larger Puerto Rican grid. 51294.pdf More Documents & Publications USVI Energy Road Map: Charting the Course to a Clean Energy Future (Brochure), EDIN (Energy Development in Island Nations), U.S. Virgin Islands U.S. Virgin Islands Energy Road Map: Analysis Waste-to-Energy Evaluation: U.S. Virgin Islands

104

CSI3131 Operating Systems Winter 2011  

E-Print Network [OSTI]

CSI3131 ­ Operating Systems Winter 2011 Tutorial 1 - Solution 1. What are three main purposes of an operating system? Hardware abstraction: To provide an environment for a computer user to execute programs of the operation and control of I/O devices. 2. Consider the various definitions of operating systems. Consider

Stojmenovic, Ivan

105

Planning considerations for the intermountain HVDC transmission system  

SciTech Connect (OSTI)

Planning of an HVDC transmission system embedded into an existing ac network may require unique control and converter equipment capability in order to satisfy stability requirements of the network. The planning and design of the Intermountain Power Project HVDC transmission system are based on unique control performance features for power transfers during terminal ac faults, rapid power recovery following fault clearing and utilization of exceptionally high transient overload capability of 2 per unit during the post-fault period to maintain system stability. The Department, in its efforts to meet the Western Systems Coordinating Council's (WSCC) reliability criteria, developed and incorporated into its HVDC specifications very rigorous reliability and availability requirements. One objective of this project was to attain the unusually low bipolar converter system outage frequency goal of one outage in five years to achieve a bipole performance rating equivalent to two ac circuits of similar capability. The reliability goals of this project have provided one of the impetus for revisions to the WSCC Reliability Criteria for System Design. The reliability goals and other features adopted for the Intermountain HVDC transmission system are discussed in this paper and study results are included to demonstrate the effectiveness of various controls implemented as stability enhancement techniques.

Lee, R.L.; Beshir, M.J.; Gee, J.H.

1986-01-01T23:59:59.000Z

106

Intermodal Transportation Operation System ( ITOS ) For The State Of California  

E-Print Network [OSTI]

Operation Systems ..31transportation operation system (ITOS) of the future,Transportation Operation System. Figure 8 envisions TMCs as

Hall, Randolph; Parekh, Chethan; Thakker, Viral

1998-01-01T23:59:59.000Z

107

IIIPRISMA System Operator's Manual PRISMA Therapy Options ............................................................................. 2  

E-Print Network [OSTI]

IIIPRISMA System Operator's Manual ... PRISMA Therapy Options .................................................................................................... PRISMA System ............................... xvi Operator's Manual ......................................................... #12;PRISMA System Operator's Manual ia Controller CCA

Kay, Mark A.

108

Silberschatz, Galvin and Gagne 2009Operating System Concepts 8th Edition, Chapter 2: Operating-System  

E-Print Network [OSTI]

Silberschatz, Galvin and Gagne ©2009Operating System Concepts ­ 8th Edition, Chapter 2: Operating-System Structures #12;2.2 Silberschatz, Galvin and Gagne ©2009Operating System Concepts ­ 8th Edition A View of Operating System Services #12;2.3 Silberschatz, Galvin and Gagne ©2009Operating System Concepts ­ 8th

Yang, Zijiang "James"

109

The Clouds Distributed Operating System * Partha Dasgupta  

E-Print Network [OSTI]

The Clouds Distributed Operating System * Partha Dasgupta Dept. of Computer Science and Engg Ramachandran. College of Computing Georgia Tech, Atlanta, GA 30332 Keywords: Distributed Operating Systems operating system that runs on general purpose computers connected via a local­area network. The system

Yeom, Heon Young

110

Definition: System Operating Limit | Open Energy Information  

Open Energy Info (EERE)

Operating Limit Operating Limit Jump to: navigation, search Dictionary.png System Operating Limit The value (such as MW, MVar, Amperes, Frequency or Volts) that satisfies the most limiting of the prescribed operating criteria for a specified system configuration to ensure operation within acceptable reliability criteria. System Operating Limits are based upon certain operating criteria. These include, but are not limited to: Facility Ratings (Applicable pre- and post- Contingency equipment or facility ratings), Transient Stability Ratings (Applicable pre- and post-Contingency Stability Limits), Voltage Stability Ratings (Applicable pre- and post- Contingency Voltage Stability), System Voltage Limits (Applicable pre- and post- Contingency Voltage Limits)[1] Also Known As SOL

111

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-11)  

SciTech Connect (OSTI)

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

N /A

2001-05-15T23:59:59.000Z

112

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-12)  

SciTech Connect (OSTI)

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

N /A

2001-05-15T23:59:59.000Z

113

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-13)  

SciTech Connect (OSTI)

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

N /A

2001-06-06T23:59:59.000Z

114

Complex Technical System Operation Processes Identification  

Science Journals Connector (OSTI)

The methods of identification of the operation processes of complex technical systems are presented. These are methods and procedures ... for estimating the unknown basic parameters of the system operation proces...

Krzysztof Ko?owrocki; Joanna Soszy?ska-Budny

2011-01-01T23:59:59.000Z

115

UNDERSTANDING METHANE EMISSIONS SOURCES AND VIABLE MITIGATION MEASURES IN THE NATURAL GAS TRANSMISSION SYSTEMS: RUSSIAN AND U.S. EXPERIENCE  

SciTech Connect (OSTI)

This article will compare the natural gas transmission systems in the U.S. and Russia and review experience with methane mitigation technologies in the two countries. Russia and the United States (U.S.) are the world's largest consumers and producers of natural gas, and consequently, have some of the largest natural gas infrastructure. This paper compares the natural gas transmission systems in Russia and the U.S., their methane emissions and experiences in implementing methane mitigation technologies. Given the scale of the two systems, many international oil and natural gas companies have expressed interest in better understanding the methane emission volumes and trends as well as the methane mitigation options. This paper compares the two transmission systems and documents experiences in Russia and the U.S. in implementing technologies and programs for methane mitigation. The systems are inherently different. For instance, while the U.S. natural gas transmission system is represented by many companies, which operate pipelines with various characteristics, in Russia predominately one company, Gazprom, operates the gas transmission system. However, companies in both countries found that reducing methane emissions can be feasible and profitable. Examples of technologies in use include replacing wet seals with dry seals, implementing Directed Inspection and Maintenance (DI&M) programs, performing pipeline pump-down, applying composite wrap for non-leaking pipeline defects and installing low-bleed pneumatics. The research methodology for this paper involved a review of information on methane emissions trends and mitigation measures, analytical and statistical data collection; accumulation and analysis of operational data on compressor seals and other emission sources; and analysis of technologies used in both countries to mitigate methane emissions in the transmission sector. Operators of natural gas transmission systems have many options to reduce natural gas losses. Depending on the value of gas, simple, low-cost measures, such as adjusting leaking equipment components, or larger-scale measures, such as installing dry seals on compressors, can be applied.

Ishkov, A.; Akopova, Gretta; Evans, Meredydd; Yulkin, Grigory; Roshchanka, Volha; Waltzer, Suzie; Romanov, K.; Picard, David; Stepanenko, O.; Neretin, D.

2011-10-01T23:59:59.000Z

116

Operator Standpoint-Based Remote Operation System Considering the Operational Convenience for a Mobile Robot  

Science Journals Connector (OSTI)

The remotely operated mobile robot is usually controlled in the viewpoint of the mobile robot using the conventional remote operation system. However, it is a little hard ... , we propose the operator standpoint-...

Chang-Seop Shin; Gon-Woo Kim

2013-01-01T23:59:59.000Z

117

Princeton Power Systems (TRL 5 6 Component)- Marine High-Voltage Power Conditioning and Transmission System with Integrated Energy Storage  

Broader source: Energy.gov [DOE]

Princeton Power Systems (TRL 5 6 Component) - Marine High-Voltage Power Conditioning and Transmission System with Integrated Energy Storage

118

Virtualizing Operating Systems for Seamless Distributed Environments  

E-Print Network [OSTI]

Virtualizing Operating Systems for Seamless Distributed Environments 1 Tom Boyd and Partha Dasgupta. Abstract Applications and operating systems can be augmented with extra functionality by injecting bindings. This is called virtualiza- tion. We are developing a virtualizing Operating System (vOS) residing

Dasgupta, Partha

119

A robust coordinated control scheme for HVDC transmission with parallel AC systems  

SciTech Connect (OSTI)

This paper introduces a practical control philosophy for HVDC transmission in parallel operation to an AC system with particular emphasis on coordination of both transient and dynamic stability. Systematic development of the control scheme on the basis of on-line identification, optimal control and rule-based bang-optimal coordination principles is presented. Verification tests of the scheme on a physical HVDC/AC system simulator show that the simple control computer algorithm is practical and robust. The controller can successfully distinguish between different system fault severities and adapts its output signals to provide maximum synchronizing torque and ensure optimal damping of power oscillations.

To, K.W.V.; David, A.K. (Hong Kong Polytechnic (Hong Kong). Dept. of Electrical Engineering); Hammad, A.E. (N.E. Swiss Power Co., Baden (Switzerland))

1994-07-01T23:59:59.000Z

120

The electric delivery system-a complex network of transmission and distribu  

Broader source: Energy.gov (indexed) [DOE]

electric delivery system-a complex network of transmission and distribu- electric delivery system-a complex network of transmission and distribu- tion lines, substations, and electrical components-is aging. To deliver more electricity and ensure reliability, the grid needs to be modernized. As the grid is being upgraded, it is also being challenged by increased needs to integrate variable renewable energy resources such as solar and wind, the potential growth of electric vehicles and related charging infrastructure, and the potential development of new electricity market designs and operating practices. To help decision makers better understand how these changes and challenges are shaping electricity delivery systems, as well as provide the industry with the tools necessary to cope with the new designs, the Reliability and Markets activ-

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Analysis of the ITER LFS Reflectometer Transmission Line System  

SciTech Connect (OSTI)

A critical issue in the design of the ITER Low Field Side (LFS) reflectometer is the transmission line (TL) system. A TL connects each launcher to a diagnostic instrument. Each TL will typically consist of ~42 m of corrugated waveguide and up to 10 miter bends. Important issues for the performance of the TL system are mode conversion and reflections. Minimizing mode conversion and reflections in the waveguide are critical to minimizing standing waves and phase errors in the reflectometer-measured phase. The performance of the corrugated waveguide and miter bends is analyzed and recommendations given.

Hanson, Gregory R [ORNL; Wilgen, John B [ORNL; Bigelow, Tim S [ORNL; Diem, Stephanie J [ORNL; Biewer, Theodore M [ORNL

2010-01-01T23:59:59.000Z

122

ECEN 720 High-Speed Links Circuits and Systems Lab1 -Transmission Lines  

E-Print Network [OSTI]

1 ECEN 720 High-Speed Links Circuits and Systems Lab1 - Transmission Lines Objective To learn transmission lines and time-domain refectometer (TDR). Introduction Wires are used to transmit clocks and data data communication chip design, the wires are often treated as transmission lines. Proper transmission

Palermo, Sam

123

Number and propagation of line outages in cascading events in electric power transmission systems  

E-Print Network [OSTI]

Number and propagation of line outages in cascading events in electric power transmission systems of transmission lines. We estimate from observed utility data how transmission line outages propagate, and obtain of transmission lines. The multiple mechanisms involved these cascading outages are many and varied, and the power

Dobson, Ian

124

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

kVlineisupgraded. TheTehachapiRenewableTransmissionTransmissionProjectandthePaloVerde/Harquahala?DeversNo. 2 500kVline

Budhraja, Vikram

2008-01-01T23:59:59.000Z

125

Transmission of the size of units of quantities and verification conditions as applied to measurement systems  

Science Journals Connector (OSTI)

The meaning of transmission of the size of units of quantities and verification conditions applied to measurement systems is considered.

A. A. Danilov

2007-05-01T23:59:59.000Z

126

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap  

Broader source: Energy.gov (indexed) [DOE]

5, 2003 5, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap Tom Murphy Natural Resource Specialist - TFS/Bell-1 Proposed Action: Vegetation Management for the East Ellensburg Tap, 1/6 to 3/19 Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line with no easement width. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Kittatas County, WA being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear unwanted vegetation in the rights-of-ways and around transmission line structures that may impede the operation and maintenance of the

127

(DOE/EIS-0285/SA-127): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Broader source: Energy.gov (indexed) [DOE]

KEP/4 KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-127- Eugene-Alvey#2 Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Eugene-Alvey 115 kV transmission line from structure 7/1 through structure 12/2m, and along portions of the following adjacent transmission lines: Hawkins-Alvey 115KV and Alvey-Lane 115KV. Location: The project is located in the BPA Eugene Region in Lane County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to

128

(DOE/EIS-0285-SA-100): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 8/15/02  

Broader source: Energy.gov (indexed) [DOE]

5, 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-100) Joe Johnson Natural Resource Specialist TFS/Kalispell Proposed Action: Vegetation Management along the Libby-Conkelly, 1/2 to 26/4 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 125 feet to 250 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Lincoln and Flathead County, MT, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in

129

CIS 380 Operating Systems Course Number & Title (A.1) CIS 380 Operating Systems  

E-Print Network [OSTI]

CIS 380 Operating Systems Course Number & Title (A.1) CIS 380 Operating Systems Credit Units (A.2 Operating Systems (3/e). Prentice Hall, Supplementary text: W. Richard Stevens and Stephen A. Rago. Advanced) This course is an introduction to the theory and practice behind modern computer operating systems. Topics

Plotkin, Joshua B.

130

Integrating Renewable Energy into the Transmission and Distribution System of the U.S. Virgin Islands  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Renewable Energy Renewable Energy into the Transmission and Distribution System of the U.S. Virgin Islands Kari Burman, Dan Olis, Vahan Gevorgian, Adam Warren, and Robert Butt National Renewable Energy Laboratory Peter Lilienthal and John Glassmire HOMER Energy LLC Technical Report NREL/TP-7A20-51294 September 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Technical Report NREL/TP-7A20-51294 September 2011 Integrating Renewable Energy into the Transmission and Distribution System of the

131

Integrating Solar PV in Utility System Operations  

SciTech Connect (OSTI)

This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with realistic PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with well behaved PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the

Mills, A.; Botterud, A.; Wu, J.; Zhou, Z.; Hodge, B-M.; Heany, M.

2013-10-31T23:59:59.000Z

132

US Recovery Act Smart Grid Projects - Electric Transmission Systems | Open  

Open Energy Info (EERE)

American_Transmission_Company_LLC_II_Smart_Grid_Project\" American_Transmission_Company_LLC_II_Smart_Grid_Project\" title=\"American Transmission Company LLC II Smart Grid Project\">American Transmission Company LLC II Smart Grid Project","title":"American Transmission Company LLC II Smart Grid Project","link":null,"lat":43.0116784,"lon":-88.2314813,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Transmission_Company_LLC_Smart_Grid_Project\" title=\"American Transmission Company LLC Smart Grid Project\">American

133

Method and apparatus for operating a powertrain system upon detecting a stuck-closed clutch  

DOE Patents [OSTI]

A powertrain system includes a multi-mode transmission having a plurality of torque machines. A method for controlling the powertrain system includes identifying all presently applied clutches including commanded applied clutches and the stuck-closed clutch upon detecting one of the torque-transfer clutches is in a stuck-closed condition. A closed-loop control system is employed to control operation of the multi-mode transmission accounting for all the presently applied clutches.

Hansen, R. Anthony

2014-02-18T23:59:59.000Z

134

WATER DISTRIBUTION SYSTEM OPERATION: APPLICATION OF  

E-Print Network [OSTI]

CHAPTER 5 WATER DISTRIBUTION SYSTEM OPERATION: APPLICATION OF SIMULATED ANNEALING Fred E. Goldman Arizona State University, Tempe, Arizona 5.1 INTRODUCTION The operation of water distribution systems affects the water quality in these systems. EPA regulations require that water quality be maintained

Mays, Larry W.

135

Integrating Solar PV in Utility System Operations  

E-Print Network [OSTI]

normal distribution. Bonneville Power Administration BPA2009 BPA separately quantifies following reserve andand system operators). BPA picks a single reserve quantity

Mills, A.

2014-01-01T23:59:59.000Z

136

Integrating Solar PV in Utility System Operations  

E-Print Network [OSTI]

System Operator combined cycle Control Performance Standardstart-up times such as combined cycle plants. However, we do4 steam turbines, 9 combined cycle, and 41 combustion

Mills, A.

2014-01-01T23:59:59.000Z

137

Intelligent E-Learning System for Training Power Systems Operators  

Science Journals Connector (OSTI)

Training of operators has become an important problem to be faced by power systems: updating knowledge and skills. An operator must comprehend the physical operation of the process and must be skilled ... . We ar...

Liliana Argotte; Yasmin Hernandez

2011-01-01T23:59:59.000Z

138

AN INFINITE DIMENSIONAL DESCRIPTOR SYSTEM MODEL FOR ELECTRICAL CIRCUITS WITH TRANSMISSION LINES  

E-Print Network [OSTI]

AN INFINITE DIMENSIONAL DESCRIPTOR SYSTEM MODEL FOR ELECTRICAL CIRCUITS WITH TRANSMISSION LINES TIMO REIS Abstract. In this paper a model of linear electrical circuits with transmission lines is de-coupled with the telegraph equations who describe the behavior of the transmission lines. The resulting system of equations

Reis, Timo

139

Calculation of transmission system losses for the Taiwan Power Company by the artificial neural network with time decayed weight  

SciTech Connect (OSTI)

For energy conservation and improvement of power system operation efficiency, how to reduce the transmission system losses becomes an important topic of grave concern. To understand the cause, and to evaluate the amount, of the losses are the prior steps to diminish them. To simplify the evaluation procedure without losing too much accuracy, this paper adopts the artificial neural network, which is a model free network, to analyze the transmission system losses. As the artificial neural network with time decayed weight has the capability of learning, memorizing, and forgetting, it is more suitable for a power system with gradually changing characteristics. By using this artificial neural network, the estimation of transmission system losses will be more precise. In this paper, comparison will be made between the results of artificial neural network analysis and polynomial loss equations analysis.

Chu, W.C.; Chen, B.K.; Mo, P.C. [Tatung Inst. of Tech., Taipei (Taiwan, Province of China)

1995-12-31T23:59:59.000Z

140

The Electricity Transmission System Future Vision & Grid Challenges  

Broader source: Energy.gov (indexed) [DOE]

Future Vision & Grid Challenges Future Vision & Grid Challenges Summary Results of Breakout Group Discussions Electricity Transmission Workshop Double Tree Crystal City, Arlington, Virginia November 1, 2012 Breakout Group Discussion Overview Future Vision and Grid Challenges Each of the four breakout groups identified the key challenges facing the grid as it integrates all of the various technologies that are (or will be) deployed while ensuring a safe, reliable, and cost-effective system as described in the Future Vision. Utilizing the Grid Tech Team framework, each group identified integration challenges through a systems-based discussion that addressed all of the following topics: * Grid Visibility What challenges in the informational domain (sensors and relays, AMIs, PMUs, end-use energy

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

EA-227 New York Independent System Operator Inc | Department...  

Broader source: Energy.gov (indexed) [DOE]

7 New York Independent System Operator Inc EA-227 New York Independent System Operator Inc Order authorizing New York Independent System Operator Inc to export electric energy to...

142

EA-227-A New York Independent System Operator | Department of...  

Broader source: Energy.gov (indexed) [DOE]

27-A New York Independent System Operator EA-227-A New York Independent System Operator Order authorizing New York Independent System Operator to export electric energy to Canada....

143

Onsite Wastewater Treatment Systems: Operation and Maintenance  

E-Print Network [OSTI]

To prevent health hazards to people and pollution in the environment, septic tank systems must be operated and maintained properly. This publication explains how septic systems work and how to keep them running properly....

Lesikar, Bruce J.

2008-10-23T23:59:59.000Z

144

Integrating Renewable Energy into the Transmission and Distribution System of the U.S. Virgin Islands  

Broader source: Energy.gov (indexed) [DOE]

Integrating Renewable Energy Integrating Renewable Energy into the Transmission and Distribution System of the U.S. Virgin Islands Kari Burman, Dan Olis, Vahan Gevorgian, Adam Warren, and Robert Butt National Renewable Energy Laboratory Peter Lilienthal and John Glassmire HOMER Energy LLC Technical Report NREL/TP-7A20-51294 September 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Technical Report NREL/TP-7A20-51294 September 2011 Integrating Renewable Energy into the Transmission and

145

Evaluating Utility System Operations Using APLUS  

E-Print Network [OSTI]

"Evaluating utility System Operations Using APLUS" Sanjay Pethe Sr. Process Engineer TENSA Services, Inc. 6200 Savoy Drive, Ste. 540 Houston, Texas 77036 ABSTRACT The steam system at a recycled paper fiberboard plant in Texas... Figure 1: Schematic of Steam System 86 "Evaluating utility System Operations Using APLUS" Sanjay Pethe Sr. Process Engineer Rajiv Singh Sr. Process Engineer TENSA Services, Inc. 6200 Savoy Drive, Ste. 540 Houston, Texas 77036 TENSA Services, Inc. 6200...

Pethe, S.; Singh, R.

146

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-15)  

SciTech Connect (OSTI)

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines. Work also includes clearing of a small (<1/4 mile) section of access road. All work will be in accordance with the National Electrical Safety Code and BPA standards. See Section 1.1 of the attached checklist for detailed information on each section of the referenced transmission lines. BPA will conduct the vegetation control with the goal of removing tall-growing vegetation that is currently or will soon be a hazard to the transmission lines and where possible to promote low-growing plant communities in the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The vegetation needing control is mainly Douglas Fir, Alder, and blackberries as indicated in Section 1.2 of the attached checklist. The work involved in the ROW includes: clearing tall growing vegetation that is currently or will soon pose a hazard to the lines; treating the associated stumps and re-sprouts with herbicide to ensure that the roots are killed preventing new sprouts; and selectively eliminating tall growing vegetation before it reaches a height or density to begin competing with low-growing vegetation. All work will take place in existing rights-of-ways and around transmission structures. All work will be accomplished by selective vegetation control methods to assure that there is little potential harm to non-target vegetation and to low-growing plants. The work will provide system reliability and fire protection. Also, all off right-of-way trees that are potentially unstable and will fall within a minimum distance or into the zone where the conductors swing will be removed. Access roads will be treated using mowing and herbicide applications. The work will provide system reliability. The subject transmission lines range from 115kV to 230kV and are made up of accompanying access roads, steel and wooden transmission line structures and associated switching platforms. The minimum clearance ranges from 21 feet for 115kV lines to 23 feet for 230kV lines. ROW easement widths vary along the length of the project. Vegetation control for this project is designed to provide a 3 year maintenance free interval. In summary, the overall vegetation management scheme will be to selectively remove tall growing vegetation then apply selective herbicide treatment using cut stump applications.

N /A

2001-06-19T23:59:59.000Z

147

Harmonic measurements made on the upgraded New Zealand inter-island HVdc transmission system  

SciTech Connect (OSTI)

This paper introduces the recent upgrade to the New Zealand inter-island HVdc transmission system. It then details the procedure of one of several tests conducted to measure harmonic levels created by the upgraded transmission system. Harmonic levels were measured using the CHART (Continuous Harmonic Analysis in Real-Time) harmonic monitoring instrumentation. The connection of CHART to the high voltage network and its configuration during the test is discussed. A sample of results gathered while monitoring are presented, including characteristic harmonics of the converter, and maximum voltage and current levels up to the 50th harmonic for each of the three a.c. phases. During the tests one of the two a.c. harmonic filters was switched out to observe its effect on harmonic levels. It was found that with both a.c. harmonic filters operating, most harmonic levels were lower than with only one filter operating. However some harmonic levels, namely the 4th harmonic, were larger with both filters operating. The paper is concluded with a discussion of the results and of the difficulties encountered in measuring harmonics of very low level.

Miller, A.J.V.; Dewe, M.B. (Univ. of Canterbury, Christchurch (New Zealand))

1994-07-01T23:59:59.000Z

148

Securing Electrical Power System Operation  

Science Journals Connector (OSTI)

Automation in power systems has avery long tradition. Just recall the flyball governor in a steam engine and it becomes clear that power people have been using control principles and instruments for more th...

Petr Horacek PhD

2009-01-01T23:59:59.000Z

149

Plant and operational features of the BPA 30 MJ superconducting magnetic energy storage system  

SciTech Connect (OSTI)

A 30 MJ superconducting magnetic energy storage (SMES) system was designed and developed for application in the Western US Power System to damp power oscillations that limit high voltage ac transmission. The system is in place at the Bonneville Power Administration (BPA) Tacoma Substation and has been in an experimental use for over a year. Extended operations of the unit have been undertaken with success. The physical, electrical, and operational features of the SMES system are given.

Rogers, J.D.; Hauer, J.F.

1984-01-01T23:59:59.000Z

150

Impact of Distributed Wind on Bulk Power System Operations in ISO-NE (Presentation)  

SciTech Connect (OSTI)

The work presented in the paper corresponding to this presentation aims to study the impact of a range of penetration levels of distributed wind on the operation of the electric power system at the transmission level. This presentation is an overview of a case study on the power system in Independent System Operator New England. It is analyzed using PLEXOS, a commercial power system simulation tool

Brancucci Martinez-Anido, C.; Hodge, B. M.; Palchak, D.; Miettinen, J.

2014-11-01T23:59:59.000Z

151

Practical Approach to Water System Optimal Operation  

Science Journals Connector (OSTI)

Abstract Optimal pump scheduling is a major consideration when dealing with minimizing operational costs of a water distribution system. Pump operation must balance between three factors. Water balance constraints, including consumer demand and water tank volumes. Hydraulic constraints determining water pump operating point. Electrical tariff rate effecting energy cost. Optimization models may assume linear or discrete pump operation, depending on type and accuracy of the model in use. Linear operation assumes the pump may operate during part of the time step while discrete operation requires the pump to be either on or off during the entire time step. Linear optimization models commonly have short solution times, but cannot contain non-linear constraints such as hydraulic headloss. By such, linear model results may be difficult to implement in a real water system as the hydraulic behavior of the system may render the optimal solution impractical. Likewise, if the pump operation partially uses the time step the pump may be forced to come in and out of duty often causing mechanical ware and tare. Discrete operation provides smooth pump operation and may contain non-linear hydraulic constraint to calculate a more realistic working point for the pump. Discrete models have long solution times due the vast amount of pump operating combinations, which must be explored. Heuristic techniques may be used to shorten solution times but these do not assure global minimization of the solution. The goal of the research is to create a minimum cost optimal operation water distribution system model that utilizes the short solution time of a linear model but also includes non-linear hydraulic constraints effecting pump energy consumption and discrete pump operation. The motivation is to use the model for real-time pump scheduling and for water system design.

E. Price; A. Ostfeld

2014-01-01T23:59:59.000Z

152

(DOE/EIS-0285/SA-122): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Broader source: Energy.gov (indexed) [DOE]

CSB-2 CSB-2 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-122- Bonneville-Alcoa Ed Tompkins, TFO/LMT Proposed Action: Vegetation Management for the Bonneville-Alcoa 115kV transmission line Location: The project is located in the BPA Olympia Region in Skamania and Clark Counties, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans

153

(DOE/EIS-0285/SA-57): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/10/02  

Broader source: Energy.gov (indexed) [DOE]

0, 2002 0, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57) Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Trojan-Allston Transmission Lines 1 & 2 ROW between 1/1 and 9/1. The lines are 230 kV Single Circuit Transmission Lines having an easement width of 125 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

154

DOE/EIS-0285-SA-62: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (4/16/02)  

Broader source: Energy.gov (indexed) [DOE]

DATE April 16, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-62) Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Rocky Reach - Maple Valley No. 1 Transmission Line ROW from structure 98/2 to structure 110/1. The transmission line is a 500 kV line. Location: The ROW is located King County, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear targeted vegetation along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation management along existing access road and

155

(DOE/EIS-0285-126): Supplement Analysis for the Transmission System Vegetation Management Program 2/19/03  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-126- Alvey Fairview Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Alvey Fairview 230kV transmission line from structure 1/1 through structure 64/7. Location: The project is located in the BPA Eugene Region in Coos, Douglas, and Lane Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

156

(DOE/EIS-0285/SA-55): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/12/02  

Broader source: Energy.gov (indexed) [DOE]

2, 2002 2, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-55) Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Raver - Paul No. 1 Transmission Line ROW from structure 15/5 to 29/3. The transmission line is a 500 kV line. Location: The ROW is located Pierce County, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line, including both Reclaim and Danger Trees. Also, access road clearing will be

157

A distributed on-line HV transmission condition monitoring information system  

SciTech Connect (OSTI)

China Light and Power Company Ltd. (CLP) is responsible for supplying electricity to the whole of Hong Kong except Hong Kong Island and Lamma Island. In CLP`s Castle Peak power plant, 19 kV and 23 kV electric supplies are generated. The voltage is then stepped up to 400 kV for transmission. The intermediate control between those transformers and the major 400 kV overhead transmission system lies with a standard One and a half Breaker Configuration switch substations. The substation houses single phase encapsulated SF{sub 6} circuit breakers. In the urban centers, 400 kV substations are installed to step down 400 kV to 132 kV or further to 11 kV for distribution. This paper describes the development of a on-line distributed information system for monitoring the conditions of the whole HV transmission system. The system continuously monitors status of each circuit breaker (CB) together with important operational parameters, such as duration during making and breaking, operations of hydraulic pumps and SF{sub 6} gas pressure etc. Each group of CBs is monitored by a standalone microcontroller using a local area network with a baud rate of 9,600. The information can be recorded on the harddisk of an on-site microcomputer and further transmitted back to a remote computer for alarm generation and multi-station supervision. The CLP 400 kV substation and the Tsz Wan Shan 400 kV substation are among the first targets for development.

Chan, W.L. [Hong Kong Polytechnic Univ., Kowloon (Hong Kong)] [Hong Kong Polytechnic Univ., Kowloon (Hong Kong); Pang, S.L.; Chan, T.M. [China Light and Power Co. Ltd., Hong Kong (Hong Kong)] [China Light and Power Co. Ltd., Hong Kong (Hong Kong); So, A.T.P. [City Univ. of Hong Kong, Kowloon (Hong Kong)] [City Univ. of Hong Kong, Kowloon (Hong Kong)

1997-04-01T23:59:59.000Z

158

Magnetohydrodynamic electromagnetic pulse (MHD-EMP) interaction with power transmission and distribution systems  

SciTech Connect (OSTI)

This report discusses the effects of the late-time high-altitude electromagnetic pulse (HEMP) on electrical transmission and distribution (T&D) systems. This environment, known as the magnetohydrodynamic electromagnetic pulse (MHD-EMP), is a very slowly varying electric field induced in the earth`s surface, similar to the field induced by a geomagnetic storm. It can result in the flow of a quasi-dc current in grounded power lines and in the subsequent magnetic saturation of transformers. This saturation, in turn, causes 6-Hz harmonic distortion and an increase in the reactive power required by generation facilities. This report analyzes and discusses these phenomena. The MHD-EMP environment is briefly discussed, and a simplified form of the earth-induced electric field is developed for use in a parametric study of transmission line responses. Various field coupling models are described, and calculated results for the responses of both transmission- and distribution-class power lines are presented. These calculated responses are compared with measurements of transformer operation under dc excitation to infer the MHD-EMP response of these power system components. It is found that the MHD-EMP environment would have a marked effect on a power system by inducing up to several hundreds of amperes of quasi-dc current on power lines. These currents will cause transformers to saturate which could result in excessive harmonic generation, voltage swings, and voltage suppression. The design of critical facilities which are required to operate during and after MHD-EMP events will have to be modified in order to mitigate the effects of these abnormal power system conditions.

Tesche, F.M. [Tesche (F.M.), Dallas, TX (United States); Barnes, P.R. [Oak Ridge National Lab., TN (United States); Meliopoulos, A.P.S. [Georgia Inst. of Tech., Atlanta, GA (United States). Dept. of Electrical Engineering

1992-02-01T23:59:59.000Z

159

ECEN 720 High-Speed Links: Circuits and Systems Lab1 -Transmission Lines  

E-Print Network [OSTI]

1 ECEN 720 High-Speed Links: Circuits and Systems Lab1 - Transmission Lines Objective To learn about transmission lines and time-domain reflectometer (TDR). Introduction Wires are used to transmit. In high speed data communication chip design, the wires are often treated as transmission lines. Proper

Palermo, Sam

160

Comparison of reliability performance of group connected and conventional HVDC transmission systems  

SciTech Connect (OSTI)

A group connected HVDC transmission scheme is a variant of the unit connection where instead of a single generator, a group of generators are directly connected to the converter. Studies conducted in the past indicated that significant cost reduction can be achieved using this scheme. This is mainly due to the elimination of many components which results in considerable capital and operating cost savings to the utility. Concerns regarding the reliability performance of unit connected schemes were raised, however, there has not been a detailed reliability study conducted. This paper addresses the reliability evaluation aspect of a group connected scheme and compares the reliability performance of the group connected scheme with that of the conventional common collector system. Reliability models for both schemes were developed using a hypothetical system model based on the Nelson River system. Practical system component outage data was used to examine the reliability performance of both schemes.

Kuruganty, S. [Univ. of North Dakota, Grand Forks, ND (United States). Dept. of Electrical Engineering] [Univ. of North Dakota, Grand Forks, ND (United States). Dept. of Electrical Engineering

1995-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Operation of staged membrane oxidation reactor systems  

SciTech Connect (OSTI)

A method of operating a multi-stage ion transport membrane oxidation system. The method comprises providing a multi-stage ion transport membrane oxidation system with at least a first membrane oxidation stage and a second membrane oxidation stage, operating the ion transport membrane oxidation system at operating conditions including a characteristic temperature of the first membrane oxidation stage and a characteristic temperature of the second membrane oxidation stage; and controlling the production capacity and/or the product quality by changing the characteristic temperature of the first membrane oxidation stage and/or changing the characteristic temperature of the second membrane oxidation stage.

Repasky, John Michael

2012-10-16T23:59:59.000Z

162

Some Experiences on BEPCII SRF System Operation  

E-Print Network [OSTI]

The Superconducting Radio Frequency (SRF) system of the upgrade project of Beijing Electron Positron Collider (BEPCII) has been in operation for almost 8 years. The SRF system has accelerated both electron and positron at the design beam current of 910 mA successfully, and a high beam intensity colliding of 860 mA (electron)*910 mA (positron) has been achieved in April 2014. Many problems were encountered during the operation, among which some were solved and some remain unsolved. This paper will describe some experiences on BEPCII SRF system operation, including the symptoms, causes and solutions.

Huang Tong-ming; Lin Hai-ying; Sha Peng; Sun Yi; Pan Wei-min; Wang Guang-wei; Dai Jian-ping; Li Zhong-quan; Ma Qiang; Wang Qun-yao; Zhao Guang-yuan; Mi Zheng-hui

2014-11-19T23:59:59.000Z

163

Some Experiences on BEPCII SRF System Operation  

E-Print Network [OSTI]

The Superconducting Radio Frequency (SRF) system of the upgrade project of Beijing Electron Positron Collider (BEPCII) has been in operation for almost 8 years. The SRF system has accelerated both electron and positron at the design beam current of 910 mA successfully, and a high beam intensity colliding of 860 mA (electron)*910 mA (positron) has been achieved in April 2014. Many problems were encountered during the operation, among which some were solved and some remain unsolved. This paper will describe some experiences on BEPCII SRF system operation, including the symptoms, causes and solutions.

Tong-ming, Huang; Peng, Sha; Yi, Sun; Wei-min, Pan; Guang-wei, Wang; Jian-ping, Dai; Zhong-quan, Li; Qiang, Ma; Qun-yao, Wang; Guang-yuan, Zhao; Zheng-hui, Mi

2014-01-01T23:59:59.000Z

164

PIA - WEB Unclassified Business Operations General Support System...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support...

165

The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations  

SciTech Connect (OSTI)

Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

Kirby, Brendan J [ORNL

2006-07-01T23:59:59.000Z

166

Operations Directorate Integrated Safety and Environmental Management Systems  

E-Print Network [OSTI]

Operations Directorate Integrated Safety and Environmental Management Systems (ISEMS) Plan Directorate Integrated Safety and Environmental Management System (ISEMS) Plan The Operations Directorate, Operations Date #12;The Operations Directorate ISEMS Plan 032108 bf 2 Annual Review and Update Operations

Wechsler, Risa H.

167

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network [OSTI]

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System ........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB% NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby-

168

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network [OSTI]

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB Standby NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby- 1 100% 1 1063

169

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network [OSTI]

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System ........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB Standby NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby- 1 Standby NA

170

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network [OSTI]

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB Standby NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby- 1 30% NA 1062

171

AVESTAR® - Operational Excellence for Clean Energy Systems  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operational Excellence for Clean Energy Systems Operational Excellence for Clean Energy Systems Chart The world-class Advanced Virtual Energy Simulation Training and Research (AVESTAR®) Center at the U.S. Department of Energy's National Energy Technology Laboratory (NETL) is dedicated to accelerating progress toward achieving operational excellence for commercial-scale, clean energy systems from smart plants to smart grid. With two locations in Morgantown, WV, one at the NETL and the other at West Virginia University's National Research Center for Coal and Energy, the AVESTAR Center is accomplishing its vital mission by bringing together: Advanced dynamic simulation, control, and virtual plant technologies Real-time, high-fidelity dynamic simulators with full-scope operator training systems (OTS)

172

Asbestos : operating system security for mobile devices  

E-Print Network [OSTI]

This thesis presents the design and implementation of a port of the Asbestos operating system to the ARM processor. The port to the ARM allows Asbestos to run on mobile devices such as cell phones and personal digital ...

Stevenson, Martijn

2006-01-01T23:59:59.000Z

173

Transmission and Grid Integration: Electricity, Resources, & Building Systems Integration (Fact Sheet)  

SciTech Connect (OSTI)

Factsheet developed to describe the activites of the Transmission and Grid Integration Group within NREL's Electricity, Resources, and Buildings Systems Integration center.

Not Available

2009-09-01T23:59:59.000Z

174

HIGH-POWER MILLIMETREWAVE TRANSMISSION SYSTEMS AND COMPONENTS FOR ELECTRON CYCLOTRON HEATING OF FUSION PLASMAS  

Science Journals Connector (OSTI)

At the Institute for Plasma Research at the University of Stuttgart, high-power millimetre wave transmission systems for electron cyclotron heating (ECRH) and current drive (ECCD)...

W. Kasparek; G. Dammertz; V. Erckmann

2005-01-01T23:59:59.000Z

175

Efficient, Portable, and Robust Extension of Operating System Functionality  

E-Print Network [OSTI]

Efficient, Portable, and Robust Extension of Operating System Functionality Amin Vahdat, Douglas, operating systems are not chosen for underlying system features, but rather for the performance of the underlying hardware, available application programs, and system stability. Consequently, operating system

Newhall, Tia

176

Method and Apparatus Providing Deception and/or Altered Operation in an Information System Operating System  

DOE Patents [OSTI]

A method and/or system and/or apparatus providing deception and/or execution alteration in an information system. In specific embodiments, deceptions and/or protections are provided by intercepting and/or modifying operation of one or more system calls of an operating system.

Cohen, Fred (Livermore, CA); Rogers, Deanna T. (Fremont, CA); Neagoe, Vicentiu (San Leandro, CA)

2008-10-14T23:59:59.000Z

177

Abstract--Three known use-based allocation methods for payments of electricity transmission systems are compared.  

E-Print Network [OSTI]

, transmission pricing, transmission use, wheeling allocation, distribution factors. I. INTRODUCTION he worldwide to relate transmission pricing to use of system factors was made by Hugh Rudnick, Rodrigo Palma and Enrique

Catholic University of Chile (Universidad Católica de Chile)

178

HVAC filtration for controlling infectious airborne disease transmission in indoor environments: Predicting risk reductions and operational costs  

Science Journals Connector (OSTI)

Abstract This work describes and applies a methodology for estimating the impact of recirculating heating, ventilating, and air-conditioning (HVAC) particle filters on the control of size-resolved infectious aerosols in indoor environments using a modified version of the Wells-Riley model for predicting risks of infectious disease transmission. Estimates of risk reductions and associated operational costs of both HVAC filtration and equivalent outdoor air ventilation are modeled and compared using a case study of airborne transmission of influenza in a hypothetical office space. Overall, recirculating HVAC filtration was predicted to achieve risk reductions at lower costs of operation than equivalent levels of outdoor air ventilation, particularly for MERV 1316 filters. Medium efficiency filtration products (MERV 711) are also inexpensive to operate but appear less effective in reducing infectious disease risks.

Parham Azimi; Brent Stephens

2013-01-01T23:59:59.000Z

179

A high speed image transmission system for ultra-wideband wireless links  

E-Print Network [OSTI]

Ultra-wideband (UWB) communication is an emerging technology that offers short range, high data rate wireless transmission, with low power consumption and low consumer cost. Operating in the 3.1 GHz - 10.6 GHz frequency ...

Liang, Helen He

2009-01-01T23:59:59.000Z

180

Nova power systems: status and operating experience  

SciTech Connect (OSTI)

This paper describes the pulse power systems that are used in these lasers; the status and the operating experiences. The pulsed power system for the Nova Laser is comprised of several distinct technology areas. The large capacitor banks for driving flashlamps that excite the laser glass is one area, the fast pulsers that drive pockels cell shutters is another area, and the contol system for the pulsed power is a third. This paper discusses the capacitor banks and control systems.

Whitham, K.; Merritt, B.T.; Gritton, D.G.; Smart, A.J.; Holloway, R.W.; Oicles, J.A.

1983-11-28T23:59:59.000Z

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Installation of PV systems in GreeceReliability improvement in the transmission and distribution system  

Science Journals Connector (OSTI)

Photovoltaic (PV) power systems are becoming one of the most developing investment areas in the field of Renewable Energy Sources (RES). A statement of the status quo of PV power systems in Greece, and their contribution towards the improvement of power system reliability, is the scope of the present paper. Siting and installation of PV power systems is performed according to a recent Greek law, along with environmental and geographical constraints. Meteorological data are computed, formulated and imported to appropriate software in order to simulate the PV units and generate their power output. Data for unserved loads, resulting from load shedding during peak hours, are compared to the above estimated power production. Assuming that a proportion of the eventually unsupplied power could be provided by the accessed power generation of the PV units, the reliability of both transmission and distribution system is improved. The impact on the transmission system is shown by an improvement of LOLP and LOEP indices, whereas peak shaving for the Interconnected Greek Transmission System (IGTS) is also illustrated. For the distribution system the impact is quantified using the distribution system reliability indices SAIDI, SAIFI, and CAIDI. Finally, the resulting improvement is also expressed in financial terms.

Aggelos S. Bouhouras; Antonios G. Marinopoulos; Dimitris P. Labridis; Petros S. Dokopoulos

2010-01-01T23:59:59.000Z

182

Integrated Retail & Wholesale Power System Operation  

E-Print Network [OSTI]

(open-source release): AMES Wholesale Power Market Testbed (ISU) + GridLAB-D distribution platform (DOE in Wholesale Power Markets: Experimental Findings Using an Agent-Based Testbed", invited talk for the Institute of Retail and Wholesale Power System Operations", Agent Technologies for Energy Systems (ATES) Workshop

Tesfatsion, Leigh

183

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network [OSTI]

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System ........................................ 6 for the Carbon Tetrachloride system was completed in 2010. ** EDB has only been detected in the influent at trace and Recirculate Tritium 4 Operate- 9 Standby- 7 100% NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC

184

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in  

Broader source: Energy.gov (indexed) [DOE]

4: Montana-to-Washington Transmission System Upgrade Project 4: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana SUMMARY This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations. The project website is http://efw.bpa.gov/environmental_services/Document_Library/M2W/. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVALABLE FOR DOWNLOAD May 3, 2012 EIS-0484: Notice of Intent to Prepare an Environmental Impact Statement

185

Testing of the Data Transmission System Monika Grothe, Ariane Frey, Massimiliano Turri, Max Wilder  

E-Print Network [OSTI]

Testing of the Data Transmission System Components Monika Grothe, Ariane Frey, Massimiliano Turri August 1999 Abstract This note provides a description of the set­up for testing the data transmission system electronics for the BaBar Silicon Vertex Tracker. #12; Contents 1 List of tested Components 3 2

California at Santa Cruz, University of

186

Advanced Non-Distributed Operating Systems Course Yair Wiseman  

E-Print Network [OSTI]

1 Advanced Non-Distributed Operating Systems Course Yair Wiseman Computer Science Department Bar://www.cs.biu.ac.il/~wiseman wiseman@cs.huji.ac.il Keywords: Operating Systems, Graduate Course, Operating System Kernel, Non-Distributed Operating Systems. Abstract The use of Non-Distributed Operating Systems is very common and old. Many

Wiseman, Yair

187

A Computuerized Operator Support System Prototype  

SciTech Connect (OSTI)

A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operators ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energys Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment.

Ken Thomas; Ronald Boring; Roger Lew; Tom Ulrich; Richard Villim

2013-08-01T23:59:59.000Z

188

A Computuerized Operator Support System Prototype  

SciTech Connect (OSTI)

A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operators ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energys Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment.

Ken Thomas; Ronald Boring; Roger Lew; Tom Ulrich; Richard Villim

2013-11-01T23:59:59.000Z

189

Visualizing operators of coupled spin systems  

E-Print Network [OSTI]

The state of quantum systems, their energetics, and their time evolution is modeled by abstract operators. How can one visualize such operators for coupled spin systems? A general approach is presented which consists of several shapes representing linear combinations of spherical harmonics. It is applicable to an arbitrary number of spins and can be interpreted as a generalization of Wigner functions. The corresponding visualization transforms naturally under non-selective spin rotations as well as spin permutations. Examples and applications are illustrated for the case of three spins 1/2.

Ariane Garon; Robert Zeier; Steffen J. Glaser

2014-09-18T23:59:59.000Z

190

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28)(9/5/01)  

Broader source: Energy.gov (indexed) [DOE]

September 5, 2001 September 5, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Port Angeles - Sappo No.1 Transmission Line ROW, from struture 1/1 to structure 42/10. Location: The ROW is located in Clallum County, WA, all in the Olympia Region. Proposed by: Bonneville Power Administration (BPA), Olympia Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

191

(DOE/EIS-0285/SA-75): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (06/21/02)  

Broader source: Energy.gov (indexed) [DOE]

June June 21, 2002 REPLY TO ATTN OF: KEP/Z-992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 75-Ross-Lexington. Jim Jellison -- - TFO/Olympia Ed Tompkins -- - TFO/Ross Proposed Action: Vegetation Management for the Ross Lexington Transmission Line. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove danger trees as well as unwanted vegetation in the rights-of-ways, along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and mitigation measures are discussed below. Planning Steps: 1. Identify facility and

192

(DOE/EIS-0285/SA-103): Supplemental Analysis for Transmission System Vegetation Management Program FEIS (August 12, 2002)  

Broader source: Energy.gov (indexed) [DOE]

2, 2, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-103-Keeler-Pennwalt). Jim Jellison - TFO/Olympia Ed Tompkins - TFO/Ross Proposed Action: Vegetation Management for the Keeler-Pennwalt transmission line and parts of the St. John-Keeler, Rivergate-Keeler, Keeler-Oregon City, & St. John-St. Helens lines. Location: Washington and Multnomah Counties, Oregon Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of-Ways along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action. Analysis: See the attached checklist for the

193

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22)(8/17/01)  

Broader source: Energy.gov (indexed) [DOE]

August 17, 2001 August 17, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Chief Joseph - Snohomish No.3 and 4 Transmission Line ROW. From STR 94/1 to STR 113/1 Location: The ROW is located in King and Snohomish Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

194

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-23)(8/17/01)  

Broader source: Energy.gov (indexed) [DOE]

DATE: August 17, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-23) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Schultz - Raver No.1 and 2 from 60/3 to 75/5 and the Olympia - Grand Coulee from 70/2 to 70/5 Transmission Line ROW's. Location: The ROW is located in King County, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways, around tower structures, and along access roads that may impede the operation and maintenance of the subject transmission line. All work will be executed in accordance with the National Electrical Safety

195

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-26)(9/11/01)  

Broader source: Energy.gov (indexed) [DOE]

11, 2001 11, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-26) Ben Tilley - TFE/Alvey Natural Resource Specialist Proposed Action: Vegetation Management on Reedsport-Fairview #1 Transmission Line Structure 1/5 to 39/4. Location: All ROW are located in Coos and Douglas Counties, OR, all being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA), Eugene Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

196

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-17)(7/24/01)  

Broader source: Energy.gov (indexed) [DOE]

DATE: July 24, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-17) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along selected sections of the Schulz - Raver No.1, 2, 3 & 4, Olymplia - Grand Coulee NO. 1 Transmission Line ROW's. Location: The ROW's are located in Pierce and King Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be executed in accordance with the National Electrical Safety Code and BPA

197

Sensor Technologies for a Smart Transmission System An EPRI White Paper  

Broader source: Energy.gov (indexed) [DOE]

Sensor Technologies for a Smart Transmission System Sensor Technologies for a Smart Transmission System An EPRI White Paper December 2009 December 2009 Page 2 An EPRI White Paper Sensor Technologies for a Smart Transmission System Aging equipment and tight O&M budgets are putting the squeeze on transmission line and substation managers. A new gen- eration of low-cost sensors can help diag- nose equipment health to optimize mainte- nance and prevent catastrophic failures. Power delivery systems are among the largest and most diverse, remotely located investments. There are a num- ber of challenges that utilities face with their transmis- sion line and substation assets: * Existing transmission lines and substations are aging while the required reliability is increasing and the availability of clearance to perform maintenance is

198

Distribution of bacteria within operating laboratory water purification systems.  

Science Journals Connector (OSTI)

...within operating laboratory water purification systems. G A McFeters S C...within operating laboratory water purification systems. | Experiments were...within Operating Laboratory Water Purification Systems GORDON A. McFETERS...

G A McFeters; S C Broadaway; B H Pyle; Y Egozy

1993-05-01T23:59:59.000Z

199

MINIMAL AND MAXIMAL OPERATOR SPACES AND OPERATOR SYSTEMS IN ENTANGLEMENT THEORY  

E-Print Network [OSTI]

MINIMAL AND MAXIMAL OPERATOR SPACES AND OPERATOR SYSTEMS IN ENTANGLEMENT THEORY NATHANIEL JOHNSTON-maximal operator spaces and operator systems, and investigate their relationships with the basic separability operator systems that were recently introduced and show that their cones of positive elements are exactly

Paulsen, Vern

200

CSI3131 Operating Systems Tutorial 1 Winter 2011  

E-Print Network [OSTI]

CSI3131 ­ Operating Systems Tutorial 1 ­ Winter 2011 1. What are three main purposes of an operating system? 2. Consider the various definitions of operating systems. Consider whether the operating activities of an operating system in regard to process management? 8. What are three major activities

Stojmenovic, Ivan

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Frequency selection of an inductive contactless power transmission system for ocean observing  

Science Journals Connector (OSTI)

Inductive Contactless Power Transmission (ICPT) may suffer considerable power loss due to eddy currents in seawater when applied undersea rather than on land. The loss of power, which is harmful to transmission efficiency, is closely related to the transmission frequency. However, the relationship between the transmission frequency and the efficiency has rarely been studied. In this paper, we analytically deduce the power transmission efficiency in air and the power loss of ICPT in seawater. Based on the theoretical calculation and analysis, guidelines are provided to select the optimum frequency to maximise the efficiency. A case study is then performed to numerically determine the optimum frequency for an undersea ICPT system. Laboratory experiments are conducted to confirm the theoretical results. A prototype ICPT system power is designed and built. A lake trial demonstrates that the designed system is able to transmit power contactless to actual undersea observation network equipment underwater with an efficiency of approximately 85% and a 5mm gap distance.

Jie Zhou; De-jun Li; Ying Chen

2013-01-01T23:59:59.000Z

202

New York Independent System Operator, Smart Grid RFI: Addressing...  

Broader source: Energy.gov (indexed) [DOE]

York Independent System Operator, Smart Grid RFI: Addressing Policy and Logistical Challenges. New York Independent System Operator, Smart Grid RFI: Addressing Policy and...

203

Assessment of Offshore Wind System Design, Safety, and Operation...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Assessment of Offshore Wind System Design, Safety, and Operation Standards Assessment of Offshore Wind System Design, Safety, and Operation Standards The U.S. Department of...

204

W-026, operational test report isokenetic stack effluent monitoring system  

SciTech Connect (OSTI)

This Operational Test Report was performed to assure the Isokinetic Stack Effluent Monitoring System (ISEMS) operates in accordance with system design and specifications.

Bottenus, R.J.

1997-08-22T23:59:59.000Z

205

A graphical operations interface for modular surface systems  

E-Print Network [OSTI]

This paper presents the design and implementation of algorithms for a new graphical operations interface system specifically adapted to operating modular reconfigurable articulated surface systems. Geometric models of ...

Vona, Marsette A.

206

Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at...

207

CS 550: Advanced Operating Systems This course covers general issues of design and implementation of advanced modern operating systems.  

E-Print Network [OSTI]

CS 550: Advanced Operating Systems Objectives This course covers general issues of design and implementation of advanced modern operating systems. The focus is on issues that are critical to the applications Operating Systems - CS Dept, Illinois ... 1 of 1 #12;

Heller, Barbara

208

March 29, 2008 Operating Systems: The course 1 Introduction  

E-Print Network [OSTI]

March 29, 2008 Operating Systems: The course 1 Introduction Chapter 1 #12;March 29, 2008 Operating Systems: The course 2 Objectives To provide a grand tour of the major operating systems components To provide coverage of basic computer system organization #12;March 29, 2008 Operating Systems: The course 3

Adam, Salah

209

California Independent System Operator | Open Energy Information  

Open Energy Info (EERE)

Operator Operator Jump to: navigation, search 200px Name California Independent System Operator Address California ISO P.O. Box 639014 Place Folsom, California Zip 95763-9014 Sector Services Phone number 916-351-4400 Website http://www.caiso.com Coordinates 38.68°, -121.18° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.68,"lon":-121.18,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

210

AN OPERATOR EXPERIENCE WITH A HIERARCHICAL REALTIME CONTROL SYSTEM (RCS)  

E-Print Network [OSTI]

AN OPERATOR EXPERIENCE WITH A HIERARCHICAL REAL­TIME CONTROL SYSTEM (RCS) Hui­Min Huang Mechanical@cme.nist.gov ABSTRACT The issue of operator interface in the RCS hierarchical control systems is the focus operators to be involved in system operations in different degrees. In some situations, the operators

211

Control landscapes for open system quantum operations  

Science Journals Connector (OSTI)

The reliable realization of control operations is a key component of quantum information applications. In practice, meeting this goal is very demanding for open quantum systems. This paper investigates the landscape defined as the fidelity J between the desired and achieved quantum operations with an open system. The goal is to maximize J as a functional of the control variables. We specify the complete set of critical points of the landscape function in the so-called kinematic picture. An associated Hessian analysis of the landscape reveals that, upon the satisfaction of a particular controllability criterion, thecritical topology is dependent on the particular environment, but no false traps (i.e. suboptimal solutions) exist. Thus, a gradient-type search algorithm should not be hindered in searching for the ultimate optimal solution with such controllable systems. Moreover, the maximal fidelity is proven to coincide with Uhlmann's fidelity between the environmental initial states associated with the achieved and desired quantum operations, which provides a generalization of Uhlmann's theorem in terms of Kraus maps.

Re-Bing Wu; Herschel Rabitz

2012-01-01T23:59:59.000Z

212

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

operatingattributes: Loadfollowing. Spinningandnon?dispatchable,thenloadfollowing,regulation,rampingregulation,ramping,loadfollowing,voltagesupportand

Budhraja, Vikram

2008-01-01T23:59:59.000Z

213

Adaptive neurofuzzy inference system-based pollution severity prediction of polymeric insulators in power transmission lines  

Science Journals Connector (OSTI)

This paper presents the prediction of pollution severity of the polymeric insulators used in power transmission lines using adaptive neurofuzzy inference system (ANFIS) model. In this work, laboratory-based pollution performance tests were carried out ...

C. Muniraj; S. Chandraseka

2011-01-01T23:59:59.000Z

214

Security analysis of the interaction between the UK gas and electricity transmission systems  

E-Print Network [OSTI]

Natural gas has become the UKs foremost primary energy source, providing some 39% of our energy needs. The National Transmission System (NTS) has developed from its humble beginnings when natural gas was first discovered ...

Whiteford, James Raymond George

2012-06-25T23:59:59.000Z

215

On adaptive transmission, signal detection and channel estimation for multiple antenna systems  

E-Print Network [OSTI]

This research concerns analysis of system capacity, development of adaptive transmission schemes with known channel state information at the transmitter (CSIT) and design of new signal detection and channel estimation schemes with low complexity...

Xie, Yongzhe

2004-11-15T23:59:59.000Z

216

100 Meter Time of Flight System for Transmission Experiments Michael Rapp, Yaron Danon, Robert Block  

E-Print Network [OSTI]

100 Meter Time of Flight System for Transmission Experiments Michael Rapp, Yaron Danon, Robert of the detectors was chosen to take advantage of the neutron beam geometry at the detector location, 100 meters

Danon, Yaron

217

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

218

Distribution of Wind Power Forecasting Errors from Operational Systems (Presentation)  

SciTech Connect (OSTI)

This presentation offers new data and statistical analysis of wind power forecasting errors in operational systems.

Hodge, B. M.; Ela, E.; Milligan, M.

2011-10-01T23:59:59.000Z

219

Introduction If you are taking an undergraduate operating systems course,  

E-Print Network [OSTI]

1 Introduction If you are taking an undergraduate operating systems course, you should already have is called the operating system (OS)3 , as it is in charge of making sure the system operates correctly, we sometimes refer to the operating system as a virtual machine. Of course, in order to allow users

Sheridan, Jennifer

220

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Broader source: Energy.gov (indexed) [DOE]

Purpose, Need and Issues Purpose, Need and Issues S-1 Summary In this summary: ΠPurpose, Need, and Issues ΠMethods and Their Impacts ΠPlanning Steps ΠProgram Alternatives and Their Impacts Purpose, Need and Issues Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 15,000 miles of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure S-1.) Those states offer a great diversity of vegetation (from trees to brush to grasses), which can interfere with electric power flow, pose safety problems for us and neighboring members of the public, or interfere with our ability to maintain our system. We need to keep vegetation a safe distance away from our electric power facilities and control

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

The Electricity Transmission System Opportunities to Overcome Key Challenges  

Broader source: Energy.gov (indexed) [DOE]

Opportunities to Overcome Key Challenges Opportunities to Overcome Key Challenges Summary Results of Breakout Group Discussions Electricity Transmission Workshop Double Tree Crystal City, Arlington, Virginia November 2, 2012 Breakout Group Discussion Overview Opportunities to Overcome Key Challenges Each of the four breakout groups prioritized the critical issues facing the grid from the list of synthesized challenges identified in the first breakout session of the workshop. Focusing on these top priorities, each group proposed specific R&D activities and initiatives that DOE can pursue to overcome these challenges and address existing gaps. Summary of Synthesized Challenges A. Need improved understanding of the availability, utility, maintenance, exchange, and security of data and associated requirements.

222

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

223

July 31 Webinar to Provide Guidance on Transmission Feasibility and System  

Broader source: Energy.gov (indexed) [DOE]

July 31 Webinar to Provide Guidance on Transmission Feasibility and July 31 Webinar to Provide Guidance on Transmission Feasibility and System Impact Studies July 31 Webinar to Provide Guidance on Transmission Feasibility and System Impact Studies July 24, 2013 - 10:32am Addthis The U.S. Department of Energy (DOE) Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series webinar, "Conducting Transmission Feasibility and System Impact Studies," on Wednesday, July 31, 2013, from 1:00 p.m. to 2:30 p.m. Eastern Time. The development of more renewable energy resources raises challenges and opportunities for the electric grid relating to upgrades and potential new construction. Likewise, commercial-scale renewable energy development

224

Enhanced Geothermal Systems (EGS) with CO2as Heat Transmission...  

Broader source: Energy.gov (indexed) [DOE]

precipitation with spatial and temporal flow variations in CO2brinerock systems Tracer Methods for Characterizing Fracture Stimulation in Engineered Geothermal Systems (EGS)...

225

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect (OSTI)

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

226

Report on System operation A background report prepared by the Nordel Operation  

E-Print Network [OSTI]

.................................................................................................................... 3 2 COOPERATION AND PRINCIPLES AGREED IN SYSTEM OPERATION AGREEMENT REGARDING POWER SHORTAGE will further improve the system security. Training of operation people is continuously important to be able in System Operation Agreement regarding power shortage and disturbance situations 2.1 Purpose of the System

227

Operating Systems B. RANDELL, Editor The Nucleus of a  

E-Print Network [OSTI]

Operating Systems B. RANDELL, Editor The Nucleus of a Multiprogramming System PIER BRINCIt HANSEN- programming system that can be extended with a hierarchy of operating systems to suit diverse requirements among them. KEY WORDS AND PHRASES: multiprogramming,operating systems,paralle I processes

Han, Richard Y.

228

Noninterference for a practical DIFC-based operating system  

E-Print Network [OSTI]

The Flume system is an implementation of decentralized information flow control (DIFC) at the operating system level. Prior work has shown Flume can be implemented as a practical extension to the Linux operating system, ...

Tromer, Eran

229

Design and Operational Considerations of Educational Satellite Systems  

Science Journals Connector (OSTI)

...The implications of hybrid video systems are examined, incorporating fixed...critical aspect of the educational system operation is likely to be the production...operational problems of a typical system are explored, emphasizing the...

1975-01-01T23:59:59.000Z

230

Electric Transmission and Distribution Future R&D Needs Planning, Operation, Control, and Visualization  

Broader source: Energy.gov (indexed) [DOE]

27-28, 2013 27-28, 2013 Washington, DC FY13 DOE/CERTS Transmission Reliability R&D Internal Program Review Research Projects Reliability Standards Analysis and Assessments  Frequency Response Event Collection and Analysis  NERC Interconnections 2012 Annual Grid Reliability Performance Analysis and Report Page 1 Reliability Standards Analysis and Assessment  Objective: Collect grid data and conduct grid reliability performance analysis to support the NERC committees/groups (Resources Subcommittee and RS- Frequency Working Group) in the following ways: - Perform grid reliability metrics analysis using data collected in CERTS applications as requested by the RS - Analyze collected data to assess reliability performance at different levels - Interconnection, Reliability Coordinator, Balancing Authority

231

A quick course in operating systems Raphael Finkel  

E-Print Network [OSTI]

A quick course in operating systems Raphael Finkel Computer Science Department University of Kentucky Lexington, KY raphael@ms.uky.edu raphael@ukma.bitnet Operating Systems 1 #12; What is an operating #################################### An operating system is a set of algorithms that allocate resources to processes

Finkel, Raphael

232

Electrical Collection and Transmission Systems for Offshore Wind Power: Preprint  

SciTech Connect (OSTI)

The electrical systems needed for offshore wind farms to collect power from wind turbines--and transmit it to shore--will be a significant cost element of these systems. This paper describes the development of a simplified model of the cost and performance of such systems.

Green, J.; Bowen, A.; Fingersh, L.J.; Wan, Y.

2007-03-01T23:59:59.000Z

233

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25)(9/5/01)  

Broader source: Energy.gov (indexed) [DOE]

5, 2001 5, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25) Elizabeth Johnson - TFR/The Dalles Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along selected ROW sections of the Ostrander-Pearl transmission line. The ROWs include sections of the Ostrander-Pearl 500 kV line; the Ostrander-McLoughlin 500 kV line; the Big Eddy-Chemawa 230 kV line and the Big Eddy- McLoughlin 230 kV line. Location: The ROW is located in Clackamas County, Oregon, within the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights- of-way and around tower structures that may impede the operation and maintenance of the

234

(DOE/EIS-0285/SA-07): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/18/01  

Broader source: Energy.gov (indexed) [DOE]

18, 2001 18, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-07) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management on section of three ROWs. The ROWs include selected sections of the McNary Powerhouse, the present and proposed new sections of the McNary-Roundup and the McNary Switchyard South Transmission lines. Location: All ROW are located east Umatilla, OR., all being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

235

Application of multi-variable control for automatic frequency controller of HVDC transmission system  

SciTech Connect (OSTI)

In an HVDC transmission system that links two ac power systems, the automatic frequency controller (AFC) calculates power to be interchanged between the two ac systems according to their frequencies thereby improving the frequency characteristics of the two power systems. This paper introduces a newly developed dc AFC system, which applies a multi-variable control to the dc system-based frequency control. It is capable of controlling the frequencies of the two ac systems optimally while maintaining their stability. This system was developed for one of Japan's HVDC transmission facilities and produced good results in a combined test using a power system simulator. The field installation will be completed in March 1993, when the AFC system will enter service.

Sanpei, Masatoshi (Electric Power Development Co., Tokyo (Japan)); Kakehi, Atsuyuki; Takeda, Hideo (Toshiba Corp., Tokyo (Japan))

1994-04-01T23:59:59.000Z

236

Intelligent Environment for Training of Power Systems Operators  

Science Journals Connector (OSTI)

Training of operators has become an important problem to be faced by power systems: updating knowledge and skills. An operator must comprehend the physical operation of the process and must be skilled ... . We ar...

G. Arroyo-Figueroa; Yasmin Hernandez

2006-01-01T23:59:59.000Z

237

QUOTIENTS, EXACTNESS AND NUCLEARITY IN THE OPERATOR SYSTEM CATEGORY  

E-Print Network [OSTI]

QUOTIENTS, EXACTNESS AND NUCLEARITY IN THE OPERATOR SYSTEM CATEGORY ALI S. KAVRUK, VERN I. PAULSEN system category. We define operator system quotients and exactness in this setting and refine the notion of nuclearity by studying operator systems that preserve various pairs of tensor products. One of our main goals

238

An Operating System for a Time-Predictable Computing Node  

E-Print Network [OSTI]

An Operating System for a Time-Predictable Computing Node Guenter Khyo, Peter Puschner, and Martin control structures generated before runtime can as well be used within the operating system of an embedded real-time system. In this way we make not only task timing but also the timing of the operating system

239

The Case for ApplicationSpecific Operating Systems  

E-Print Network [OSTI]

The Case for Application­Specific Operating Systems Thomas E. Anderson Division of Computer Science. Traditional operating systems, however, invisibly manage physical resources on behalf of applications operating systems on top of bare hardware in the first place. As one ex­ ample, database systems have long

Anderson, Tom

240

Operating Systems: The Problems Of Performance and Reliability  

E-Print Network [OSTI]

Operating Systems: The Problems Of Performance and Reliability B. Randell University of Newcastle and reliability are amongst the most difficult that operating system designers and implementors have to face. This is particularly the case with generic operating systems, i.e., systems intended for use in many different versions

Newcastle upon Tyne, University of

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

REAL TIME SYSTEM OPERATIONS 2006-2007  

SciTech Connect (OSTI)

The Real Time System Operations (RTSO) 2006-2007 project focused on two parallel technical tasks: (1) Real-Time Applications of Phasors for Monitoring, Alarming and Control; and (2) Real-Time Voltage Security Assessment (RTVSA) Prototype Tool. The overall goal of the phasor applications project was to accelerate adoption and foster greater use of new, more accurate, time-synchronized phasor measurements by conducting research and prototyping applications on California ISO's phasor platform - Real-Time Dynamics Monitoring System (RTDMS) -- that provide previously unavailable information on the dynamic stability of the grid. Feasibility assessment studies were conducted on potential application of this technology for small-signal stability monitoring, validating/improving existing stability nomograms, conducting frequency response analysis, and obtaining real-time sensitivity information on key metrics to assess grid stress. Based on study findings, prototype applications for real-time visualization and alarming, small-signal stability monitoring, measurement based sensitivity analysis and frequency response assessment were developed, factory- and field-tested at the California ISO and at BPA. The goal of the RTVSA project was to provide California ISO with a prototype voltage security assessment tool that runs in real time within California ISO?s new reliability and congestion management system. CERTS conducted a technical assessment of appropriate algorithms, developed a prototype incorporating state-of-art algorithms (such as the continuation power flow, direct method, boundary orbiting method, and hyperplanes) into a framework most suitable for an operations environment. Based on study findings, a functional specification was prepared, which the California ISO has since used to procure a production-quality tool that is now a part of a suite of advanced computational tools that is used by California ISO for reliability and congestion management.

Eto, Joseph H.; Parashar, Manu; Lewis, Nancy Jo

2008-08-15T23:59:59.000Z

242

Analysis of transmission system faults in the phase domain  

E-Print Network [OSTI]

the zero, positive and negative sequences. d) Calculate the post-fault line current ij 2 2 2 ij j ij z VI ?= (2.15) where ij is the primitive impedance element between nodes i and j. After all these sequence quantities... in Figure 5. The data of this system is listed in Tables 1, 2, and 3. Figure 5. System diagram for the 3-bus system Table 1 Generator data (3 Bus system) Generator impedance(p.u.) # Gen. connection P N Z 1 Y-grounded 0.05j 0.05j 0.15j 2...

Zhu, Jun

2004-11-15T23:59:59.000Z

243

RAPID/Geothermal/Transmission Siting & Interconnection/Alaska...  

Open Energy Info (EERE)

receivers appointed by a court, that owns, operates, manages, or controls any plant, pipeline, or system for furnishing, by generation, transmission, or distribution, electrical...

244

Minimum Cost Operation Mode and Minimum Loss Operation Mode of Power System Operation Mode Selection Based on Voltage Stability  

Science Journals Connector (OSTI)

Two formulae an optimal P-Q generation formula for minimum system cost and an optimal MW allocation formula for minimum system loss are described in this paper. The author defines two kinds of power system operation

Sang-Joong Lee

2006-01-01T23:59:59.000Z

245

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35)  

Broader source: Energy.gov (indexed) [DOE]

14, 2001 14, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line ROW and the Mossy Rock-Chehalis Transmission Line ROW, between 7/1 to 27/10. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 162 feet. Location: The ROW is located in Lewis County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

246

Multiannual patterns of influenza A transmission in Chinese live bird market systems  

E-Print Network [OSTI]

Multiannual patterns of influenza A transmission in Chinese live bird market systems Kim M. Pepin and emergence in humans is confounded by insufficient empirical data on the ecology and dynamics of AIV in poultry systems. To address this gap, we quantified incidence patterns for 13 hemagglutinin subtypes

Webb, Colleen

247

Enhanced Geothermal Systems (EGS) with CO2as Heat Transmission...  

Broader source: Energy.gov (indexed) [DOE]

study heat extraction from hot porous systems by injection of cold CO 2 . * Reactive chemistry experiments for CO 2 -brine-rock are being assembled (INL). 6 | US DOE Geothermal...

248

CRAD, System Operating Test Procedures - October 23, 2014 (EA...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) CRAD, System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) October 23, 2014...

249

Nonlinear control of a coupled PDE/ODE system modeling a switched power converter with a transmission line  

E-Print Network [OSTI]

with a transmission line Jamal Daafouz, Marius Tucsnak and Julie Valein Avril 2014 Abstract We consider an infinite dimensional system modeling a boost converter connected to a load via a transmission line. The governing.tucsnak@univ-lorraine.fr, julie.valein@univ-lorraine.fr 1 #12;converters connected to transmission lines is a very difficult task

Valein, Julie - Institut de Mathématiques ?lie Cartan, Université Henri Poincaré

250

NOS/VE experience panel. [NOS/VE operating system  

SciTech Connect (OSTI)

The report consists of slides and accompanying remarks for the presentation on the NOS/VE operating system. (WRF)

Tisch, R.D.

1987-01-01T23:59:59.000Z

251

An Application-Independent System for Visualizing User Operation History  

E-Print Network [OSTI]

An Application-Independent System for Visualizing User Operation History Toshio Nakamura Department conventional interactive systems provide the user operation history only as a list of text commands. The text have been proposed. For example, the Chimera system [17] visualizes an operation history as a sequence

Igarashi, Takeo

252

Extensibility, Safety and Performance in the SPIN Operating System  

E-Print Network [OSTI]

Extensibility, Safety and Performance in the SPIN Operating System Brian N. Bershad Stefan Savage the motivation, architecture and per- formance of SPIN, an extensible operating system. SPIN provides change the operating system's interface and implementation. Extensions allow an application to specialize

Savage, Stefan

253

Fast Concurrent Dynamic Linking for an Adaptive Operating System  

E-Print Network [OSTI]

Fast Concurrent Dynamic Linking for an Adaptive Operating System Crispin Cowan, Tito Autrey operating system is one that can adapt to some particular circumstance to gain some functional or perfor due to the cost of inter-process protection barriers. Commercial operating systems that can e ciently

Walpole, Jonathan

254

DUAL OPERATOR SYSTEMS DAVID P. BLECHER AND BOJAN MAGAJNA  

E-Print Network [OSTI]

DUAL OPERATOR SYSTEMS DAVID P. BLECHER AND BOJAN MAGAJNA Abstract. We characterize weak* closed system, which is the dual of an operator space, can be represented completely isometrically and weak, and also in mathematical physics. The natural setting for this notion is the category of operator systems

Magajna, Bojan

255

Component-based General-purpose Operating System Martin Decky  

E-Print Network [OSTI]

Component-based General-purpose Operating System Martin Deck´y Charles University, Faculty to apply this programming and design paradigm in the domain of general-purpose operating systems. This paper analyzes several nice properties of component systems which might be beneficial in operating

256

Comprehensive Hardware and Software Support for Operating Systems  

E-Print Network [OSTI]

Comprehensive Hardware and Software Support for Operating Systems to Exploit MP Memory Hierarchies are becoming increasingly popular. Since many of the workloads running on these machines are operating-system intensive, we are interested in exploring the types of support for the operating system that the memory

Torrellas, Josep

257

Disco: Running Commodity Operating Systems on Scalable Multiprocessors  

E-Print Network [OSTI]

Disco: Running Commodity Operating Systems on Scalable Multiprocessors EDOUARD BUGNION, SCOTT of extending modern operating systems to run efficiently on large-scale shared-memory multiprocessors without monitors. We use virtual machines to run multiple commodity operating systems on a scalable multiproces

Bridges, Patrick

258

The Design and Implementation of a Prototype Exokernel Operating System  

E-Print Network [OSTI]

The Design and Implementation of a Prototype Exokernel Operating System by Dawson R. Engler of a Prototype Exokernel Operating System by Dawson R. Engler Submitted to the Department of Electrical of Master of Science in Computer Science and Engineering Abstract Traditional operating systems abstract

259

FAP Coherent Laser System (Polarizer) Standard Operating Procedures  

E-Print Network [OSTI]

FAP Coherent Laser System (Polarizer) Standard Operating Procedures These safety training the 110V input power. C. Chemical: No. #12;FAP Coherent Laser System (Polarizer) Standard Operating Coherent Laser System as well as describes the normal operation of the laser and any hazards that may

Cohen, Ronald C.

260

March 29, 2008 Operating Systems: Main Memory 1 Main Memory  

E-Print Network [OSTI]

March 29, 2008 Operating Systems: Main Memory 1 Main Memory Chapter 8 #12;March 29, 2008 Operating Systems: Main Memory 2 Chapter Outline Background Contiguous Memory Allocation Paging Structure of the Page Table Segmentation #12;March 29, 2008 Operating Systems: Main Memory 3 Objectives To provide

Adam, Salah

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Utility Systems Management and Operational Optimization  

E-Print Network [OSTI]

The provision of an adequate and reliable supply of utilities (fuel, steam and power) represents a significant operating cost for many industrial companies. For many industries, the energy/utilities cost is the largest operating expense after...

Dhole, V.; Seillier, D.; Garza, K.

262

Sensor, method and system of monitoring transmission lines  

SciTech Connect (OSTI)

An apparatus, method, and system for measuring the magnetic field produced by phase conductors in multi-phase power lines. The magnetic field measurements are used to determine the current load on the conductors. The magnetic fields are sensed by coils placed sufficiently proximate the lines to measure the voltage induced in the coils by the field without touching the lines. The x and y components of the magnetic fields are used to calculate the conductor sag, and then the sag data, along with the field strength data, can be used to calculate the current load on the line and the phase of the current. The sag calculations of this invention are independent of line voltage and line current measurements. The system applies a computerized fitter routine to measured and sampled voltages on the coils to accurately determine the values of parameters associated with the overhead phase conductors.

Syracuse, Steven J.; Clark, Roy; Halverson, Peter G.; Tesche, Frederick M.; Barlow, Charles V.

2012-10-02T23:59:59.000Z

263

Reliability modeling of transmission and distribution systems including dependent failures  

E-Print Network [OSTI]

is considered. Therefore, the trans i t ion rate mat r i x of the entire system need not be generated. Th i s method is compared wi th the sequential method for normal and stormy weather condit ions, and is then extended to include m weather conditions... . 9 E . Cut -Set Equations 10 III M A R K O V C U T - S E T M E T H O D 13 A . Basic Approach 13 B . Markov Cut -Set Me thod 13 C . Examp le 18 D . Compar ison wi th the Sequential Me thod 22 E . Cut-Sets w i th m Weather States 24 F . Extens...

Beydoun, Rami Sami

2012-06-07T23:59:59.000Z

264

Alvarado and Rajaraman. The 2003 Blackout: Did the System Operator Have Enough Power? page 1 Christensen Associates 4610 University Avenue, Ste. 700 Madison, WI 53705-2164 Voice 608.231.2266 Fax 608.231.2108  

E-Print Network [OSTI]

grid. In such a case, power has to be re-routed to other less loaded transmission lines. For example, to relieve an overload in one transmission line, the system operator in PJM typically re-routes transmission lines began tripping out of service. (It is also possible that there may have been other

265

An optimally designed stack effluent sampling system with transpiration for active transmission enhancement  

E-Print Network [OSTI]

for which there is no true real-time measurement is particulate mass. A light attenuation system that is based on the opacity of the stack gas is used in an attempt to fill this void. Though this system provides monitoring on a real time basis...AN OPTIMALLY DESIGNED STACK EFFLUENT SAMPLING SYSTEM WITH TRANSPIRATION FOR ACTIVE TRANSMISSION ENHANCEMENT TROY J. SCHROEDER Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements...

Schroeder, Troy J.

1995-01-01T23:59:59.000Z

266

Monitored Geologic Repository Operations Monitoring and Control System Description Document  

SciTech Connect (OSTI)

The Monitored Geologic Repository Operations Monitoring and Control System provides supervisory control, monitoring, and selected remote control of primary and secondary repository operations. Primary repository operations consist of both surface and subsurface activities relating to high-level waste receipt, preparation, and emplacement. Secondary repository operations consist of support operations for waste handling and treatment, utilities, subsurface construction, and other selected ancillary activities. Remote control of the subsurface emplacement operations, as well as, repository performance confirmation operations are the direct responsibility of the system. In addition, the system monitors parameters such as radiological data, air quality data, fire detection status, meteorological conditions, unauthorized access, and abnormal operating conditions, to ensure a safe workplace for personnel. Parameters are displayed in a real-time manner to human operators regarding surface and subsurface conditions. The system performs supervisory monitoring and control for both important to safety and non-safety systems. The system provides repository operational information, alarm capability, and human operator response messages during emergency response situations. The system also includes logic control to place equipment, systems, and utilities in a safe operational mode or complete shutdown during emergency response situations. The system initiates alarms and provides operational data to enable appropriate actions at the local level in support of emergency response, radiological protection response, evacuation, and underground rescue. The system provides data communications, data processing, managerial reports, data storage, and data analysis. This system's primary surface and subsurface operator consoles, for both supervisory and remote control activities, will be located in a Central Control Center (CCC) inside one of the surface facility buildings. The system consists of instrument and control equipment and components necessary to provide human operators with sufficient information to monitor and control the operation of the repository in an efficient and safe manner. The system consists of operator consoles and workstations, multiple video display terminals, communications and interfacing equipment, and instrument and control software with customized configuration to meet the needs of the Monitored Geologic Repository (MGR). Process and logic controllers and the associated input/output units of each system interfaced with this system will be configured into Remote Terminal Units (RTU) and located close to the systems to be monitored and controlled. The RTUs are configured to remain operational should communication with CCC operations be lost. The system provides closed circuit television to selectively view systems, operations, and equipment areas and to aid in the operation of mechanical systems. Control and monitoring of site utility systems will be located in the CCC. Site utilities include heating, ventilation, and air conditioning equipment; plant compressed air; plant water; firewater; electrical systems; and inert gases, such as nitrogen, if required. This system interfaces with surface and subsurface systems that either generate output data or require remote control input. The system interfaces with the Site Communications System for bulk storage of operational data, on-site and off-site communication, and a plant-wide public announcement system. The system interfaces with the Safeguards and Security System to provide operational status and emergency alarm indications. The system interfaces with the Site Operation System to provide site wide acquisition of data for analysis and reports, historical information for trends, utility information for plant operation, and to receive operating plans and procedures.

E.F. Loros

2000-06-29T23:59:59.000Z

267

WRAP TRUPACT loading systems operational test report  

SciTech Connect (OSTI)

This Operational Test Report documents the operational testing of the TRUPACT process equipment HNF-3918, Revision 0, TRUPACT Operational Test Procedure. The test accomplished the following: Procedure validation; Facility equipment interface; Facility personnel support; and Subcontractor personnel support interface. Field changes are documented as test exceptions with resolutions. All resolutions are completed or a formal method is identified to track the resolution through to completion.

DOSRAMOS, E.V.

1999-09-01T23:59:59.000Z

268

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-09)  

SciTech Connect (OSTI)

BPA proposes to clear unwanted vegetation from the rights of way and access roads for BPA's McNary-Santiam No. 1 Transmission Line, beginning in the summer of 2000 and ending in July, 2001. This Supplemental Analysis finds that: (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285) and ROD; and (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.

N /A

2001-05-01T23:59:59.000Z

269

POWER GRID DYNAMICS: ENHANCING POWER SYSTEM OPERATION THROUGH PRONY ANALYSIS  

SciTech Connect (OSTI)

Prony Analysis is a technique used to decompose a signal into a series consisting of weighted complex exponentials and promises to be an effi cient way of recognizing sensitive lines during faults in power systems such as the U.S. Power grid. Positive Sequence Load Flow (PSLF) was used to simulate the performance of a simple two-area-four-generator system and the reaction of the system during a line fault. The Dynamic System Identifi cation (DSI) Toolbox was used to perform Prony analysis and use modal information to identify key transmission lines for power fl ow adjustment to improve system damping. The success of the application of Prony analysis methods to the data obtained from PSLF is reported, and the key transmission line for adjustment is identifi ed. Future work will focus on larger systems and improving the current algorithms to deal with networks such as large portions of the Western Electricity Coordinating Council (WECC) power grid.

Ray, C.; Huang, Z.

2007-01-01T23:59:59.000Z

270

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40)  

Broader source: Energy.gov (indexed) [DOE]

9, 2002 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Allston-Keeler 500 kV Transmission Line ROW exclusive to BLM lands between 8/4 through 27/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 150 feet. Location: The ROW is located in Washington and Columbia County, in the State of Oregon, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

271

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-06)  

SciTech Connect (OSTI)

BPA proposes to apply selected herbicides to control annual weeds that are competing with native grasses that were seeded two years ago. Herbicides will also be applied at the base of the existing wooden transmission line poles located in the pasture area. BPA would conduct the vegetation control with the goal of promoting native grass growth and to provide fire protection for the wooden transmission line poles. The pasture area is, for the most part, flat with elevation increasing towards the northwest corner. Slopes are not steep in that area. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

N /A

2001-04-13T23:59:59.000Z

272

Power System Operation with Large Penetrations of Wind Power  

Science Journals Connector (OSTI)

The characteristics of wind power result in unique challenges for system operators when integrating large penetrations of wind generation into power systems. This chapter discusses some of the power system ope...

Eleanor Denny

2013-01-01T23:59:59.000Z

273

A Human Performance Modeling System for Process Safety Operations  

E-Print Network [OSTI]

that system designers and safety professionals know about this required time frame before operations are initiated. Specific research goals for this project include the following: * Estimating the standard time data for operators to take corrective actions...

Harputlu, Emrah 1986-

2013-01-02T23:59:59.000Z

274

Optimal Operation for Cogenerating System of Micro-grid Network  

Science Journals Connector (OSTI)

This paper presents a mathematical model for optimal operating cogeneration of Micro-Grid Network. The electrical and thermal energy production ... solution of Optimal operation for cogenerating system of micro-grid

Phil-Hun Cho; Hak-Man Kim; Myong-Chul Shin

2005-01-01T23:59:59.000Z

275

Vice President, Transmission Marketing & Sales  

Broader source: Energy.gov [DOE]

Within Transmission Services at Bonneville Power Administration (BPA), Transmission Marketing and Sales (TS) provides open access to the Federal Transmission System (FTS) consistent with...

276

Transmission | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

277

Evaluation of power system security and development of transmission pricing method  

E-Print Network [OSTI]

benefits in transmission services. The proposed method shows the transmission transaction cost of reliability benefits when transmission line capacities are considered. The ratio between allocation by transmission line capacity-use and allocation...

Kim, Hyungchul

2004-11-15T23:59:59.000Z

278

On the Correctness of Operating System Kernels  

Science Journals Connector (OSTI)

The Verisoft project aims at the pervasive formal verification of entire computer systems. In particular, the seamless verification of the academic system is attempted. This system consists of hardware (processor...

Mauro Gargano; Mark Hillebrand; Dirk Leinenbach

2005-01-01T23:59:59.000Z

279

On the correctness of operating system kernels  

Science Journals Connector (OSTI)

The Verisoft project aims at the pervasive formal verification of entire computer systems. In particular, the seamless verification of the academic system is attempted. This system consists of hardware (processor and devices) on top of which runs ...

Mauro Gargano; Mark Hillebrand; Dirk Leinenbach; Wolfgang Paul

2005-08-01T23:59:59.000Z

280

Cost-Effectivenessof PhotovoltaicGenerationIn A Transmission-Constrained Load Area of An InterconnectedSystem  

E-Print Network [OSTI]

stations and then deliver that energy through the interconnected transmission and distribution systems are important factors for electricity enterprises to consider in their planning activities. One new important Abstract: Electric power systems of today are experiencing a difficulty of constrained transmission lines

Gross, George

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Impact of Distribution-Connected Large-Scale Wind Turbines on Transmission System Stability during Large Disturbances: Preprint  

SciTech Connect (OSTI)

This work examines the dynamic impacts of distributed utility-scale wind power during contingency events on both the distribution system and the transmission system. It is the first step toward investigating high penetrations of distribution-connected wind power's impact on both distribution and transmission stability.

Zhang, Y.; Allen, A.; Hodge, B. M.

2014-02-01T23:59:59.000Z

282

A new Scanning Transmission X-ray Microscope at the ALS for operation up to 2500eV  

SciTech Connect (OSTI)

We report on the design and construction of a higher energy Scanning Transmission X-ray Microscope on a new bend magnet beam line at the Advanced Light Source. Previously we have operated such an instrument on a bend magnet for C, N and O 1s NEXAFS spectroscopy. The new instrument will have similar performance at higher energies up to and including the S 1s edge at 2472eV. A new microscope configuration is planned. A more open geometry will allow a fluorescence detector to count emitted photons from the front surface of the sample. There will be a capability for zone plate scanning in addition to the more conventional sample scanning mode. This will add the capability for imaging a massive sample at high resolution over a limited field of view, so that heavy reaction cells may be used to study processes in-situ, exploiting the longer photon attenuation length and the longer zone plate working distances available at higher photon energy. The energy range will extend down to include the C1s edge at 300eV, to allow high energy NEXAFS microscopic studies to correlate with the imaging of organics in the same sample region of interest.

Kilcoyne, David; Ade, Harald; Attwood, David; Hitchcock, Adam; McKean, Pat; Mitchell, Gary; Monteiro, Paulo; Tyliszczak, Tolek; Warwick, Tony

2010-01-31T23:59:59.000Z

283

The design of high-speed data transmission method for a small nuclear physics DAQ system  

E-Print Network [OSTI]

A large number of data need to be transmitted in high-speed between Field Programmable Gate Array (FPGA) and Advanced RISC Machines 11 micro-controller (ARM11) when we design a small data acquisition (DAQ) system for nuclear experiments. However, it is a complex problem to beat the target. In this paper, we will introduce a method which can realize the high-speed data transmission. By this way, FPGA is designed to acquire massive data from Front-end electronics (FEE) and send it to ARM11, which will transmit the data to other computer through the TCP/IP protocol. This paper mainly introduces the interface design of the high-speed transmission between FPGA and ARM11, the transmission logic of FPGA and the driver program of ARM11. The research shows that the maximal transmission speed between FPGA and ARM11 by this way can reach 50MB/s theoretically, while in nuclear physics experiment, the system can acquire data with the speed of 2.2MB/s.

Zhou, Wenxiong; Nan, Gangyang; Zhang, Jianchuan

2013-01-01T23:59:59.000Z

284

Electricity Transmission, A Primer | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

285

Gas mixing system for imaging of nanomaterials under dynamic environments by environmental transmission electron microscopy  

SciTech Connect (OSTI)

A gas mixing manifold system that is capable of delivering a stable pressure stream of a desired composition of gases into an environmental transmission electron microscope has been developed. The system is designed to provide a stable imaging environment upon changes of either the composition of the gas mixture or upon switching from one gas to another. The design of the system is described and the response of the pressure inside the microscope, the sample temperature, and sample drift in response to flow and composition changes of the system are reported.

Akatay, M. Cem [School of Materials Engineering and Birck Nanotechnology Center, Purdue University, West Lafayette, Indiana 47907 (United States)] [School of Materials Engineering and Birck Nanotechnology Center, Purdue University, West Lafayette, Indiana 47907 (United States); Zvinevich, Yury; Ribeiro, Fabio H., E-mail: fabio@purdue.edu, E-mail: estach@bnl.gov [Forney Hall of Chemical Engineering, Purdue University, West Lafayette, Indiana 47907 (United States); Baumann, Philipp [Computer Sciences, University of Applied Sciences of Northeastern Switzerland, 4132 Muttenz, Switzerland and Department of Physics, Yeshiva University, New York, New York 10016 (United States)] [Computer Sciences, University of Applied Sciences of Northeastern Switzerland, 4132 Muttenz, Switzerland and Department of Physics, Yeshiva University, New York, New York 10016 (United States); Stach, Eric A., E-mail: fabio@purdue.edu, E-mail: estach@bnl.gov [Center for Functional Nanomaterials, Brookhaven National Laboratory, Upton, New York 11973 (United States)

2014-03-15T23:59:59.000Z

286

Impact of Transmission on Resource Adequacy in Systems with Wind and Solar Power: Preprint  

SciTech Connect (OSTI)

Variable generation is on track to become a significant contributor to electric power systems worldwide. Thus, it is important to analyze the effect that renewables will have on the reliability of systems. In this paper we present a new tool being implemented at the National Renewable Energy Laboratory, which allows the inclusion of variable generation in the power system resource adequacy. The tool is used to quantify the potential contribution of transmission to reliability in highly interconnected systems and an example is provided using the Western Interconnection footprint.

Ibanez, E.; Milligan, M.

2012-02-01T23:59:59.000Z

287

Pinpointing the cause of an outage for something as complex and interconnected as the high voltage transmission system is a ve  

Broader source: Energy.gov (indexed) [DOE]

Ellen P. Vancko Ellen P. Vancko evancko@nerc.com Electric System Update: Sunday August 17, 2003, 5:00 p.m. The electric transmission system is now operating reliably. All electric power transmission lines that were removed from service during the blackout on August 14, 2003, have been returned to service with one exception. The lines between Michigan and Ontario remain out of service due to operational security reasons; however, they are expected to be returned to service later this evening. Most of the electric generating units that were removed from service during the blackout have now been returned to service (the exact number of units that went out of service is not yet known). Twenty-one of these remain out of service. A number of these generating units are expected to return to service either

288

Modeling Interregional Transmission Congestion in the NationalEnergy Modeling System  

SciTech Connect (OSTI)

Congestion analysis using National Energy Modeling National Energy Modeling System (NEMS) or NEMS-derivatives, such as LBNL-NEMS, is subject to significant caveats because the generation logic inherent in NEMS limits the extent to which interregional transmission can be utilized and intraregional transmission is not represented at all. The EMM is designed primarily to represent national energy markets therefore regional effects may be simplified in ways that make congestion analysis harder. Two ways in particular come to mind. First, NEMS underutilizes the capability of the traditional electric grid as it builds the dedicated and detached grid. Second, it also undervalues the costs of congestion by allowing more transmission than it should, due to its use of a transportation model rather than a transmission model. In order to evaluate benefits of reduced congestion using LBNL-NEMS, Berkeley Lab identified three possible solutions: (1) implement true simultaneous power flow, (2) always build new plants within EMM regions even to serve remote load, and (3) the dedicated and detached grid should be part of the known grid. Based on these findings, Berkeley Lab recommends the following next steps: (1) Change the build logic that always places new capacity where it is needed and allow the transmission grid to be expanded dynamically. (2) The dedicated and detached grid should be combined with the traditional grid. (3) Remove the bias towards gas fired combine cycle and coal generation, which are the only types of generation currently allowed out of region. (4) A power flow layer should be embedded in LBNL-NEMS to appropriately model and limit transmission.

Gumerman, Etan; Chan, Peter; Lesieutre, Bernard; Marnay, Chris; Wang, Juan

2006-05-25T23:59:59.000Z

289

Economic Operation and Planning of Distribution System Sources.  

E-Print Network [OSTI]

??This thesis presents the findings of some research carried out pertaining to economic operation and planning distribution systems. An optimal capacitor switching algorithm is developed (more)

Li, KaiYu

2010-01-01T23:59:59.000Z

290

Novel Decentralized Operation Schemes for Smart Distribution Systems.  

E-Print Network [OSTI]

??Recently, there have been many initiatives to incorporate advanced controls, two way communications, digital technologies and advanced power system components in the operation and control (more)

Elkhatib, Mohamed

2012-01-01T23:59:59.000Z

291

A computational framework for risk-based power systems operations under uncertainty. Part I: Theory  

Science Journals Connector (OSTI)

Abstract With larger penetrations of wind power, the uncertainty increases in power systems operations. The wind power forecast errors must be accounted for by adapting existing operating tools or designing new ones. A switch from the deterministic framework used today to a probabilistic one has been advocated. This two-part paper presents a framework for risk-based operations of power systems. This framework builds on the operating risk defined as the probability of the system to be outside the stable operation domain, given probabilistic forecasts for the uncertainty (load and wind power generation levels) and outage rates of chosen elements of the system (generators and transmission lines). This operating risk can be seen as a probabilistic formulation of the N?1 criterion. The stable operation domain is defined by voltage-stability limits, small-signal stability limits, thermal stability limits and other operating limits. In Part I of the paper, a previous method for estimating the operating risk is extended by using a new model for the joint distribution of the uncertainty. This new model allows for a decrease in computation time of the method, which allows for the use of later and more up-to-date forecasts. In Part II, the accuracy and the computation requirements of the method using this new model will be analyzed and compared to the previously used model for the uncertainty. The method developed in this paper is able to tackle the two challenges associated with risk-based real-time operations: accurately estimating very low operating risks and doing so in a very limited amount of time.

Camille Hamon; Magnus Perninge; Lennart Sder

2015-01-01T23:59:59.000Z

292

Impact of Distributed Wind on Bulk Power System Operations in ISO-NE: Preprint  

SciTech Connect (OSTI)

The work presented in this paper aims to study the impact of a range of penetration levels of distributed wind on the operation of the electric power system at the transmission level. This paper presents a case study on the power system in Independent System Operator New England. It is analyzed using PLEXOS, a commercial power system simulation tool. The results show that increasing the integration of distributed wind reduces total variable electricity generation costs, coal- and gas-fired electricity generation, electricity imports, and CO2 emissions, and increases wind curtailment. The variability and uncertainty of wind power also increases the start-up and shutdown costs and ramping of most conventional power plants.

Brancucci Martinez-Anido, C.; Hodge, B. M.; Palchak, D.; Miettinen, J.

2014-09-01T23:59:59.000Z

293

Wind Speed Forecasting for Power System Operation  

E-Print Network [OSTI]

In order to support large-scale integration of wind power into current electric energy system, accurate wind speed forecasting is essential, because the high variation and limited predictability of wind pose profound challenges to the power system...

Zhu, Xinxin

2013-07-22T23:59:59.000Z

294

REAL TIME SYSTEM OPERATIONS 2006-2007  

E-Print Network [OSTI]

Analysis,ElectricPowerSystemResearch,Vol. 47,No. Electric PrincipalInvestigator PublicInterestEnergyResearch PhasorMeasurementUnits PointofCollapse PowerSystemsEngineeringResearch

Eto, Joseph H.

2008-01-01T23:59:59.000Z

295

(DOE/EIS-0285/SA-114): Supplement Analysis for the Transmission System Vegetation Management Program EIS (Chehalis-Raymond #1, ADNO 8114) 12/5/02  

Broader source: Energy.gov (indexed) [DOE]

December December 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-114) (Chehalis-Raymond #1, ADNO 8114) Jim Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management for portion of the Chehalis-Raymond #1 115 kV transmission line Location: Project location is within Lewis and Pacific counties, Washington and is within the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources

296

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-132 (Big Eddy-Ostrander #1)(3/19/03)  

Broader source: Energy.gov (indexed) [DOE]

9, 2003 9, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-132 (Big Eddy-Ostrander #1) Libby Johnson Natural Resource Specialist - TFR/THE DALLES Proposed Action: Vegetation Management for portion of the Big Eddy - Ostrander #1 500 kV transmission line located from tower structure 31/2 to 39/3. Location: Project location is in BPA Redmond Region in Hood River County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete

297

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-146-Custer-Ingledow No.1&2  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-146-Custer-Ingledow No.1&2 Don Atkinson Natural Resource Specialist - TFN/Snohomish Proposed Action: Vegetation Management for portion of the Custer-Ingledow No.1&2 500 kV transmission line located from tower structure 1/4 to 9/6. Location: Project location is in BPA Snohomish Region in Whatcom County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete

298

Optimization of the Heating System Operation  

E-Print Network [OSTI]

on the basis of the variation of outdoor temperature, and in this way, the heating system can be optimized....

Xu, W.; Mao, S.

2006-01-01T23:59:59.000Z

299

Operational Control of Electricity Supply Systems  

Science Journals Connector (OSTI)

... to develop, the common-diagram control system, which enables an almost unlimited number of substations, etc., to be controlled completely from one diagram and control panel, and is ... of an undertaking. It describes a wall-type system diagram which automatically indicates, which substations have changed conditions, and therefore the area involved in any disturbance. The system diagram ...

1945-09-22T23:59:59.000Z

300

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Reliability evaluation for large-scale bulk transmission systems: Volume 1, Comparative evaluation, method development, and recommendations: Final report  

SciTech Connect (OSTI)

This volume (1 of 2) contains a comparative evaluation of existing transmission system reliability programs (SYREL, GATOR, RECS) and relevant mathematical methods for transmission reliability analysis. Several new and enhanced methods in the areas of network analysis, contingency selection, remedial action, and reliability index calculation, developed and tested during the project, are described. Recommendations for methods to be used in a production grade transmission reliability assessment program are presented. 69 figs., 41 tabs.

Lam, B.P.; Lawrence, D.J.; Reppen, N.D.; Ringlee, R.J.

1988-01-01T23:59:59.000Z

302

Development of a thyristor valve for next generation 500kV HVDC transmission systems  

SciTech Connect (OSTI)

A high voltage thyristor valve is the basic component of an HVDC transmission system. Development of a 500kV valve for next generation HVDC transmission systems is described. First, the power loss of the valve is analyzed to decide a reasonable wafer size for the light triggered thyristor. From these results, a six inch diameter wafer size is selected. The light triggered thyristor, with ratings of 8kV and 3.5kA, is developed using the six inch wafer. The designing of the valve employing the thyristor and test results with the prototype valve prove that a 500kV valve can be realized by the design method.

Hasegawa, T. [Kansai Electric Power Co., Inc., Osaka (Japan)] [Kansai Electric Power Co., Inc., Osaka (Japan); Yamaji, K. [Shikoku Electric Power Co., Inc., Takamatsu (Japan)] [Shikoku Electric Power Co., Inc., Takamatsu (Japan); Irokawa, H. [Electric Power Development Co., Ltd., Tokyo (Japan)] [Electric Power Development Co., Ltd., Tokyo (Japan); Shirahama, H.; Tanaka, C.; Akabane, K.

1996-10-01T23:59:59.000Z

303

Enhanced Geothermal Systems (EGS) with CO2 as Heat Transmission Fluid  

Open Energy Info (EERE)

with CO2 as Heat Transmission Fluid with CO2 as Heat Transmission Fluid Geothermal Lab Call Project Jump to: navigation, search Last modified on July 22, 2011. Project Title Enhanced Geothermal Systems (EGS) with CO2 as Heat Transmission Fluid Project Type / Topic 1 Laboratory Call for Submission of Applications for Research, Development and Analysis of Geothermal Technologies Project Type / Topic 2 Supercritical Carbon Dioxide / Reservoir Rock Chemical Interactions Project Description Previous and current attempts to develop EGS in the U.S., Japan, Europe and Australia have all employed water as a heat transmission fluid. Water has many properties that make it a favorable medium for heat extraction, but it also has serious drawbacks. The use of supercritical CO2 (scCO2) instead of water as heat extraction fluid was suggested by Donald Brown of Los Alamos National Laboratory as a "game changing" alternative that can avoid the problems of aqueous fluids, make heretofore inaccessible energy resources available for human use, and provide ancillary benefits by using and storing CO2.

304

6.828 Operating System Engineering, Fall 2006  

E-Print Network [OSTI]

6.828 teaches the fundamentals of engineering operating systems. The following topics are studied in detail: virtual memory, kernel and user mode, system calls, threads, context switches, interrupts, interprocess communication, ...

Kaashoek, Frans

305

Hot Water Heating System Operation and Energy Conservation  

E-Print Network [OSTI]

Based on an example of the reconstruction of a hot water heating system, this paper provides an analysis and comparison of the operations of hot water heating systems, including supply water temperature adjustment, flow adjustment during each...

Shao, Z.; Chen, H.; Wei, P.

2006-01-01T23:59:59.000Z

306

Complex Technical Systems Operation, Reliability, Availability, Safety and Cost Optimization  

Science Journals Connector (OSTI)

The methods based on the results of the joint model linking a semi-Markov modeling of the system operation processes with a multistate approach to system reliability and safety and the linear programming are prop...

Krzysztof Ko?owrocki; Joanna Soszy?ska-Budny

2011-01-01T23:59:59.000Z

307

Open Access Transmission and Renewable Energy Technologies  

SciTech Connect (OSTI)

In April 1996, the Federal Regulatory Commission (PERC) approved Orders 888 and 889 and released a draft rule for public comment on capacity reservation tariffs (CRTs). Order No. 888 requires electric utilities to file transmission tariffs that would allow transmission access to third parties who want to conduct wholesale transactions, and Order No. 889 requires transmission-owning utilities to set up open access, same-time information systems (OASIS), using commercial software and Internet protocols. This paper discusses these Orders in detail, as well as some of the issues before FERC with implications for renewables, which include: transmission pricing; transmission terms and conditions; reassignment of transmission capacity; defining state and FERC jurisdiction over transmission and distribution; the pricing of ancillary services; and the adoption and implementation of independent system operators.

Porter, K.

1996-09-01T23:59:59.000Z

308

Operational results from the Saudi Solar Village Photovoltaic power system  

SciTech Connect (OSTI)

The world's largest photovoltaic power system was carried into the operation phase a few months ago. This system was developed and fabricated in the United States and it is providing electrical energy to three remote villages in Saudi Arabia. The facility includes a 350 kW photovoltaic array, 1-MW diesel powered generator, 1100 kWH lead acid batteries, a 300 KVA inverter and a solar weather data monitoring station. The photovoltaic power system is capable of completely automatic operation. It is designed to operate in stand-alone and cogeneration modes of operation.

Huraib, F.; Al-Sani, A.; Khoshami, B.H.

1982-08-01T23:59:59.000Z

309

Identifying operation behaviours for an electromechanical system.  

E-Print Network [OSTI]

??Our main objective in this thesis is to investigate three methods: Principal Component Analysis, Vector Space Model, and Signal Analysis, to establish system behaviours of (more)

Fu, Wei

2006-01-01T23:59:59.000Z

310

Introduction Operations Management of Blood Banking Systems Blood Banking Systems Network Design Supply Chain Network  

E-Print Network [OSTI]

Introduction Operations Management of Blood Banking Systems Blood Banking Systems Network Design Supply Chain Network Operations Management and Design of A Sustainable Blood Banking System Amir Masoumi of Massachusetts Amherst #12;Introduction Operations Management of Blood Banking Systems Blood Banking Systems

Nagurney, Anna

311

Case Study: Driving Operational Changes Through an Energy Monitoring System  

Broader source: Energy.gov (indexed) [DOE]

monthly reporting, checklists, monthly reporting, checklists, energy targets, and feedback leads to effective organizational change. Driving Operational Changes Through an Energy Monitoring System In 2006, IBM launched a corporate efficiency program focused on basic operation im- provements in its diverse and far-flung real estate operations. The efficiency program had behavior change as a major focus. Examples of changes include the following: * IBM implemented a monthly energy reporting system for its various facilities where

312

Operator-Based Preconditioning of Stiff Hyperbolic Systems  

Science Journals Connector (OSTI)

We introduce an operator-based scheme for preconditioning stiff components encountered in implicit methods for hyperbolic systems of PDEs posed on regular grids. The method is based on a directional splitting of the implicit operator, followed by a characteristic ... Keywords: hyperbolic systems, implicit methods, preconditioning

Daniel R. Reynolds; Ravi Samtaney; Carol S. Woodward

2010-02-01T23:59:59.000Z

313

Operational test report for 2706-T complex liquid transfer system  

SciTech Connect (OSTI)

This document is the Operational Test Report (OTR). It enters the Record Copy of the W-259 Operational Test Procedure (HNF-3610) into the document retrieval system. Additionally, the OTR summarizes significant issues associated with testing the 2706-T waste liquid transfer and storage system.

BENZEL, H.R.

1999-09-01T23:59:59.000Z

314

AUTOETCH PLASMA ETCHING SYSTEM OPERATING PROCEDURES  

E-Print Network [OSTI]

initializes during power-on or a system reset, "INITIALIZE AC2" will display for five seconds in the lower is established. #12;A disruption in power to the Auto Etch (see Figure 2, page 197) will trigger two timer the system low voltage power off for a minimum of two seconds. A ten second timer circuit will also

Yoo, S. J. Ben

315

Target System Operations and Hg Handling  

E-Print Network [OSTI]

CERN June 19-20, 2006 #12;2 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Hg System Safety RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Hg System Safety Review 19-20 June 2006 Containment/vent ports will be soap- bubble checked Primary Enclosure Secondary Enclosure #12;4 OAK RIDGE NATIONAL

McDonald, Kirk

316

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

317

Natural gas transmission and distribution model of the National Energy Modeling System  

SciTech Connect (OSTI)

The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. NEMS was developed in the Office of Integrated Analysis and Forecasting of the Energy Information Administration (EIA). NEMS is the third in a series of computer-based, midterm energy modeling systems used since 1974 by the EIA and its predecessor, the Federal Energy Administration, to analyze domestic energy-economy markets and develop projections. From 1982 through 1993, the Intermediate Future Forecasting System (IFFS) was used by the EIA for its analyses, and the Gas Analysis Modeling System (GAMS) was used within IFFS to represent natural gas markets. Prior to 1982, the Midterm Energy Forecasting System (MEFS), also referred to as the Project Independence Evaluation System (PIES), was employed. NEMS was developed to enhance and update EIA`s modeling capability by internally incorporating models of energy markets that had previously been analyzed off-line. In addition, greater structural detail in NEMS permits the analysis of a broader range of energy issues. The time horizon of NEMS is the midterm period (i.e., through 2015). In order to represent the regional differences in energy markets, the component models of NEMS function at regional levels appropriate for the markets represented, with subsequent aggregation/disaggregation to the Census Division level for reporting purposes.

NONE

1997-02-01T23:59:59.000Z

318

Tests with a line-commutated converter as a variable inductive load on the Bonneville Power Administration transmission system  

SciTech Connect (OSTI)

A twelve-pulse, line-commutated converter, with a steady-state rating of 2.5 kV and 5.5 kA, formerly used for charging and discharging a superconducting magnet, was reconfigured as a static reactive power load. Tests staged at the Tacoma, WA, substation of the Bonneville Power Administration (BPA) revealed that the converter could be used as a variable inductive load, provided a stable current controller was installed. The unit was modulated as a variable VAR load following a sinusoidal VAR demand signal with an amplitude up to 14.8 MVAR. The total losses at maximum VAR output were 370 kW. This paper explains the necessary modifications of the converter to operate as a variable reactive load. Measured current waveshapes are analyzed. The effects of such a load on the BPA transmission system are presented.

Boenig, H.J.; Hauer, J.F.; Nielsen, R.G.

1986-01-01T23:59:59.000Z

319

(DOE/EIS-0285/SA-27): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 10/22/01  

Broader source: Energy.gov (indexed) [DOE]

October 22, 2001 October 22, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-27) Ben Tilley - TFE/Alvey Natural Resource Specialist Proposed Action: Vegetation Management along the Marion-Alvey #1 from structure 14/5 to 64/3 and the Marion-Lane #1 from structure 14/5 to 70/2. Both lines describe the same segment of ROW between structures 14/5 and 45/2. Location: All ROW are located in Marion, Linn, and Lane Counties, OR, all being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA), Eugene Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways, around tower structures, and associated access roads that may impede the operation and

320

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Broader source: Energy.gov (indexed) [DOE]

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Broader source: Energy.gov (indexed) [DOE]

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

322

Comprehensive Simulation Framework for Power System Operation  

Science Journals Connector (OSTI)

The Electric Power and Communication Synchronizing Simulator (EPOCHS) [13, 14...] has been the first approach to combine simulators for power system and communication networks. Here, the authors connected the two...

Sven Christian Mller; Hanno Georg

2014-01-01T23:59:59.000Z

323

Transmission Reliability | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

324

Using the expert systems in the operational management of production  

Science Journals Connector (OSTI)

In the conditions of computing the human society, the operational management activities can be improved by using artificial intelligence. The expert system is an intelligent system based on the symbolic representation of knowing, implemented on 2 hardware ... Keywords: artificial intelligence, expert systems, implementing the expert system, interface, search engine

Ioan Constantin Dima; Janos. Gabrara; Vladimir Modrak; Pachura Piotr; Constanta Popescu

2010-06-01T23:59:59.000Z

325

Improving Turbocharged Diesel Engine Operation with Turbo Power Assist System  

E-Print Network [OSTI]

Improving Turbocharged Diesel Engine Operation with Turbo Power Assist System I. Kolmanovsky A. G. In this pa- per we investigate the coupling of a power assist system at the turbocharger shaft of a diesel representation of a diesel engine with a turbocharger power assist system. A turbocharger power assist system

Stefanopoulou, Anna

326

Natural Gas Transmission and Distribution Model of the National Energy Modeling System. Volume 1  

SciTech Connect (OSTI)

The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. The NGTDM is the model within the NEMS that represents the transmission, distribution, and pricing of natural gas. The model also includes representations of the end-use demand for natural gas, the production of domestic natural gas, and the availability of natural gas traded on the international market based on information received from other NEMS models. The NGTDM determines the flow of natural gas in an aggregate, domestic pipeline network, connecting domestic and foreign supply regions with 12 demand regions. The purpose of this report is to provide a reference document for model analysts, users, and the public that defines the objectives of the model, describes its basic design, provides detail on the methodology employed, and describes the model inputs, outputs, and key assumptions. Subsequent chapters of this report provide: an overview of NGTDM; a description of the interface between the NEMS and NGTDM; an overview of the solution methodology of the NGTDM; the solution methodology for the Annual Flow Module; the solution methodology for the Distributor Tariff Module; the solution methodology for the Capacity Expansion Module; the solution methodology for the Pipeline Tariff Module; and a description of model assumptions, inputs, and outputs.

NONE

1998-01-01T23:59:59.000Z

327

Silberschatz, Galvin and Gagne 2007Operating System Concepts with Java 7th Edition, Nov 15, 2006 Chapter 2: Operating-System Structures  

E-Print Network [OSTI]

Silberschatz, Galvin and Gagne ©2007Operating System Concepts with Java ­ 7th Edition, Nov 15, 2006 Chapter 2: Operating-System Structures #12;2.2 Silberschatz, Galvin and Gagne ©2007Operating System Concepts with Java ­ 7th Edition, Nov 15, 2006 Chapter 2: Operating-System Structures Operating System

Bezrukov, Sergei

328

A Framework for Adaptable Operating and Runtime Systems  

SciTech Connect (OSTI)

The emergence of new classes of HPC systems where performance improvement is enabled by Moores Law for technology is manifest through multi-core-based architectures including specialized GPU structures. Operating systems were originally designed for control of uniprocessor systems. By the 1980s multiprogramming, virtual memory, and network interconnection were integral services incorporated as part of most modern computers. HPC operating systems were primarily derivatives of the Unix model with Linux dominating the Top-500 list. The use of Linux for commodity clusters was first pioneered by the NASA Beowulf Project. However, the rapid increase in number of cores to achieve performance gain through technology advances has exposed the limitations of POSIX general-purpose operating systems in scaling and efficiency. This project was undertaken through the leadership of Sandia National Laboratories and in partnership of the University of New Mexico to investigate the alternative of composable lightweight kernels on scalable HPC architectures to achieve superior performance for a wide range of applications. The use of composable operating systems is intended to provide a minimalist set of services specifically required by a given application to preclude overheads and operational uncertainties (OS noise) that have been demonstrated to degrade efficiency and operational consistency. This project was undertaken as an exploration to investigate possible strategies and methods for composable lightweight kernel operating systems towards support for extreme scale systems.

Sterling, Thomas

2014-03-04T23:59:59.000Z

329

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70)  

Broader source: Energy.gov (indexed) [DOE]

(8-89) memorandum DATE: 7/19/02 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70) Bill Erickson - TFP/Walla Walla Natural Resource Specialist TO: Proposed Action: Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). Location: The ROWs are located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions.

330

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42)  

Broader source: Energy.gov (indexed) [DOE]

5, 2002 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Snohomish - Murray #1 from str 1\4 to str 18\5. The proposed work will be to remove both danger and reclaim trees outside and inside the right-of-way, respectively. Right-of-way width varies from 125 to 300 feet. Location: The ROW is located in Snohomish County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove both reclaim and danger trees inside and outside the transmission line right of way. BPA crews or contract crews will cut only trees that have

331

Training on PV Systems: Design, Construction, Operation and Maintenance |  

Open Energy Info (EERE)

Training on PV Systems: Design, Construction, Operation and Maintenance Training on PV Systems: Design, Construction, Operation and Maintenance Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Training on PV Systems: Design, Construction, Operation and Maintenance Agency/Company /Organization: Leonardo Energy Sector: Energy Focus Area: Renewable Energy, Solar Website: www.leonardo-energy.org/node/5948 Training on PV Systems: Design, Construction, Operation and Maintenance Screenshot References: PV Training [1] Overview "A free series of six webinars will be delivered to provide the required knowledge to design a high performance photovoltaic (PV) installation, entering into economic evaluation and project cash-flow. Additionally, very practical aspects such as the construction, start-up, quality management and testing will be reviewed. Plant operation is described in detail, with

332

Montana-to-Washington Transmission System Upgrade Project - M2W  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

an existing BPA transmission line, and the proposed addition of a new series compensation substation along other existing BPA transmission lines. To understand the potential...

333

Transmission Bottleneck Project Report. March 19, 2003 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 The U.S. Department of Energy (DOE) National Transmission Grid Study (DOE 2002) determined that congestion in the U.S. electricity transmission system places daily constraints on electricity trade, increasing both electricity costs to consumers and impacts reliable operations. In an effort to support DOE's investigation of transmission bottlenecks, the Consortium for Electric Reliability Technology Solutions (CERTS) surveyed the current state of transmission congestion around the nation. Transmission Bottleneck Project Report. March 19, 2003 More Documents & Publications Electricity Transmission Congestion Costs: A Review of Recent Reports 2012 National Electric Transmission Congestion Study: Preliminary Findings

334

System Calls and Interrupt Vectors in an Operating Systems Mark A. Holliday  

E-Print Network [OSTI]

System Calls and Interrupt Vectors in an Operating Systems Course' Mark A. Holliday Western@wcu.edu Abstract The introductory operating systems course has a tendency to appear to the student as a disparate policies. We describe a sequence of material to cover early in the operating systems course that prevents

Holliday, Mark A.

335

System and method of cylinder deactivation for optimal engine torque-speed map operation  

DOE Patents [OSTI]

This disclosure provides a system and method for determining cylinder deactivation in a vehicle engine to optimize fuel consumption while providing the desired or demanded power. In one aspect, data indicative of terrain variation is utilized in determining a vehicle target operating state. An optimal active cylinder distribution and corresponding fueling is determined from a recommendation from a supervisory agent monitoring the operating state of the vehicle of a subset of the total number of cylinders, and a determination as to which number of cylinders provides the optimal fuel consumption. Once the optimal cylinder number is determined, a transmission gear shift recommendation is provided in view of the determined active cylinder distribution and target operating state.

Sujan, Vivek A; Frazier, Timothy R; Follen, Kenneth; Moon, Suk-Min

2014-11-11T23:59:59.000Z

336

EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

337

Updating the Electric Grid: An Introduction to Non-Transmission  

Broader source: Energy.gov (indexed) [DOE]

Updating the Electric Grid: An Introduction to Non-Transmission Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Throughout the United States a consensus has emerged that an improved transmission system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance barriers which delay implementation of needed transmission improvements. As State decision makers consider transmission investments, it may be important to account for Non-Transmission Alternatives (NTA). NTAs are programs and technologies that complement and improve operation of existing transmission systems that individually or in combination defer or eliminate the need for upgrades to

338

Updating the Electric Grid: An Introduction to Non-Transmission  

Broader source: Energy.gov (indexed) [DOE]

Updating the Electric Grid: An Introduction to Non-Transmission Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Throughout the United States a consensus has emerged that an improved transmission system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance barriers which delay implementation of needed transmission improvements. As State decision makers consider transmission investments, it may be important to account for Non-Transmission Alternatives (NTA). NTAs are programs and technologies that complement and improve operation of existing transmission systems that individually or in combination defer or eliminate the need for upgrades to

339

An integrated multivariate approach for performance assessment and optimisation of electricity transmission systems  

Science Journals Connector (OSTI)

This article introduces an integrated approach based on data envelopment analysis (DEA) and principal component analysis (PCA) for efficiency assessment, and optimisation in transmission systems that have been responsible for the transmission of electricity in Iran to show its applicability and superiority. Performance of 16 regional electricity companies was evaluated using the non-parametric technique of DEA. The result indicates that the performance of several companies is sub-optimal, suggesting the potential for significant cost reduction and reduction in employee number. The optimisation procedure in this article is followed from two different viewpoints, i.e. input efficiency and -cost. The result of DEA model is verified and validated by PCA through Spearman correlation experiment. Moreover, the proposed approach uses the measure-specific super-efficiency DEA model for sensitivity analysis to determine the critical inputs based on efficiency and cost allocation super-efficiency DEA model to determine the critical inputs based on cost. The unique feature of this study is utilisation of DEA model for assessment and determination of critical inputs and optimisation for the critical inputs from two different viewpoints, i.e. input-efficiency and -cost. This is the first study that introduces a total approach for performance assessment and optimisation of electricity transmission companies.

Ali Azadeh; Somayeh Ahmadi Movaghar

2010-01-01T23:59:59.000Z

340

Columbia River System Operation Review on Selecting an Operating Strategy for the Federal Columbia River Power System; 21Feb1997  

Broader source: Energy.gov (indexed) [DOE]

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Bonneville Power Administration Columbia River System Operation Review on Selecting an Operating Strategy for the Federal Columbia River Power System (FCRPS) AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE) ACTION: Record of Decision (ROD) SUMMARY: The Columbia River System Operation Review (SOR) Environmental Impact Statement (EIS) assessed operations at the 14 Federal dams and reservoirs on the Columbia and lower Snake Rivers that have a major influence on the multiple purpose system operation, and for which power production is coordinated under the Pacific Northwest Coordination Agreement. Lead agencies for this six-year process were the U.S. Army Corps of Engineers (Corps), the U.S. Bureau of Reclamation

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Charging system with galvanic isolation and multiple operating modes  

DOE Patents [OSTI]

Systems and methods are provided for operating a charging system with galvanic isolation adapted for multiple operating modes. A vehicle charging system comprises a DC interface, an AC interface, a first conversion module coupled to the DC interface, and a second conversion module coupled to the AC interface. An isolation module is coupled between the first conversion module and the second conversion module. The isolation module comprises a transformer and a switching element coupled between the transformer and the second conversion module. The transformer and the switching element are cooperatively configured for a plurality of operating modes, wherein each operating mode of the plurality of operating modes corresponds to a respective turns ratio of the transformer.

Kajouke, Lateef A.; Perisic, Milun; Ransom, Ray M.

2013-01-08T23:59:59.000Z

342

Impact of dispersed solar and wind systems on electric distribution planning and operation  

SciTech Connect (OSTI)

Small-scale dispersed solar photovoltaic and wind generation (DSW) will affect the generation, transmission, and distribution systems of an electric utility. This study examines the technical and economic impacts of dispersing DSW devices within the distribution system. Dispersed intermittent generation is included. Effects of DSW devices on capital investments, reliability, operating and maintenance costs, protection requirements, and communication and control requirements are examined. A DSW operation model is developed to help determine the dependable capacity of fluctuating solar photovoltaic and wind generation as part of the distribution planning process. Specific case studies using distribution system data and renewable resource data for Southern California Edison Company and Consumers Power Company are analyzed to gain insights into the effects of interconnecting DSW devices. The DSW devices were found to offer some distribution investment savings, depending on their availability during peak loads. For a summer-peaking utility, for example, dispersing photovoltaic systems is more likely to defer distribution capital investments than dispersing wind systems. Dispersing storage devices to increase DSW's dependable capacity for distribution systems needs is not economically attractive. Substation placement of DSW and storage devices is found to be more cost effective than feeder or customer placement. Examination of the effects of DSW on distribution system operation showed that small customer-owned DSW devices are not likely to disrupt present time-current distribution protection coordination. Present maintenance work procedures, are adequate to ensure workmen's safety. Regulating voltages within appropriate limits will become more complex with intermittent generation along the distribution feeders.

Boardman, R.W.; Patton, R.; Curtice, D.H.

1981-02-01T23:59:59.000Z

343

Managing Uncertainty in Operational Control of Water Distribution Systems  

E-Print Network [OSTI]

Managing Uncertainty in Operational Control of Water Distribution Systems A. Bargiela Department. There are system management decisions concerning the regulatory measures such as water pricing principles, effluent in water distribution systems con- cern reservoir(s) management with associated pump scheduling

Bargiela, Andrzej

344

Report on the Workshop on Operational Text Classification Systems  

E-Print Network [OSTI]

, user needs, personnel and training, resource demands, maintaining effectiveness over time, and inteReport on the Workshop on Operational Text Classification Systems (OTC-01) David D. Lewis on Operational Text Classification (OTC-01), occurred September 13, 2001 in New Orleans, Louisiana, US. It was co

Sebastiani, Fabrizio

345

The Case for a Factored Operating System (fos)  

E-Print Network [OSTI]

The next decade will afford us computer chips with 1,000 - 10,000 cores on a single piece of silicon. Contemporary operating systems have been designed to operate on a single core or small number of cores and hence are not ...

Agarwal, Anant

2008-10-08T23:59:59.000Z

346

Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

347

Lithium System Operation Dan Lev and David Stein  

E-Print Network [OSTI]

Lithium System Operation Dan Lev and David Stein March 1, 2011 (or Lithium tank for dummies) 1 #12 for Ordering . . . . . . . . . . . . . . . . . 51 9 Lithium Handling 52 9.1 Glove Box for Ordering . . . . . . . . . . . . . . . . . 57 9.2 Lithium Cleaning

348

The Influence of ATM on Operating Systems Jonathan M. Smith  

E-Print Network [OSTI]

The Influence of ATM on Operating Systems Jonathan M. Smith CIS Department, University support [Smith 90, Smith 93, Chung 95] designed to expose the strengths of the ATM technology

Smith, Jonathan M.

349

EIS-0170: Columbia River System Operation Review, BPA Area  

Broader source: Energy.gov [DOE]

The Columbia River System Operation Review Final Environmental Impact Statement (EIS) evaluates the potential impacts of four alternatives that represent the likely range of allocations between the Federal and non-Federal projects.

350

Operability test report for the mobile color camera system (MCCS)  

SciTech Connect (OSTI)

This supporting document is the Operational Test Procedure for the Mobile Color Camera System (MCCS). This is a purged camera for temporary in-tank video use in Hanford waste tanks.

Esvelt, C.A.

1997-01-28T23:59:59.000Z

351

Operation Diagnostics - Use of Operation Patterns to Verify and Optimize Building and System Operation  

E-Print Network [OSTI]

.ensan.de), and the Annex 40 "Commissioning of Buildings and HVAC Systems for Improved Energy Per- formance" (www.commissioning-hvac.org) within the ECBCS Program of the International Energy Agency (IEA). The author is grateful for the free use of Pia, countless emails...

Baumann, O.

2004-01-01T23:59:59.000Z

352

Build, Own, Operate and Maintain (BOOM) Boiler Systems  

E-Print Network [OSTI]

Build, Own, Operate and Maintain (BOOM) Boiler Systems Tom Henry, Annstrong Service, Inc. Overview: The article addresses the growing trend in outsourcing boiler equipment, installation, operation, maintenance and ownership by large.... In most cases, thennal, electric and air energy systems are not considered "core" assets resulting in the need to find "other" solutions to providing the needed energy. ? Reduced staffing has resulted in fewer experienced and knowledgeable boiler...

Henry, T.

353

Minimization of the vibration transmission through the propeller?shafting system in a submarine  

Science Journals Connector (OSTI)

Ships and submarines are efficient sources of underwater radiated noise. In the low?frequency range the main sources of ship vibration and noise are the working machinery such as the diesel engines gearboxes and generators and the propeller/propulsion system. Rotation of the propeller results in discrete tonals at the blade passing frequency and its harmonics. In addition in the case of a submarine hydrodynamic forces acting on the propeller due to the fluctuating pressure field are transmitted through the propeller?shaft and thrust bearings resulting in axial excitation of the submarine hull. A hydraulic dynamic absorber also known as a resonant changer is used to minimize the vibration transmission through the propeller?shafting system in order to prevent excitation of the hull axial resonances. The present work is concerned with minimizing the vibration transmission to the hull by optimizing the virtual spring mass and damper parameters associated with the resonant changer in a submarine. The dynamic response of the propeller?shafting system including the propeller shaft thrust bearing thrust block foundation and resonant changer are characterized using four pole parameters.

2004-01-01T23:59:59.000Z

354

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-34) (12/3/01)  

Broader source: Energy.gov (indexed) [DOE]

3, 2001 3, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-34) Bill Erickson - TFP/Walla Walla Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the McNary-Ross Transmission Line ROW between 152/3+2120 to 153/4. The line is 345 kV Single Circuit Transmission Line (project includes adjacent N. Bonneville-Ross 230 kV Single Circuit Transmission Line) having a combined easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Skamania County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA).

355

(DOE/EIS-0285/SA-11): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Broader source: Energy.gov (indexed) [DOE]

1) 1) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Covington-Maple Valley No. 2 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 150 feet. The proposed work will be accomplished in selected sections along the entire transmission line corridor. Location: The ROW is located in King County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with

356

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-141- SalemAlbany #2)  

Broader source: Energy.gov (indexed) [DOE]

1- SalemAlbany #2) 1- SalemAlbany #2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Salem Albany #2 115 kV transmission line from Salem Substation to Albany Substation. Location: The project is located in the BPA Eugene Region, within Marion, Polk, and Benton Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission

357

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-140- SalemAlbany1)  

Broader source: Energy.gov (indexed) [DOE]

0- SalemAlbany1) 0- SalemAlbany1) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Salem Albany #1 115 kV transmission line from Salem Substation to Albany Substation. Location: The project is located in the BPA Eugene Region, Marion, Linn, and Benton County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission

358

Transmission/Resource Library | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transmission/Resource Library < Transmission Jump to: navigation, search ResourceLibraryHeader.png Public Involvement Resources GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database About Transmission Electricity Transmission: A Primer Overview of the grid system and the role of states in overseeing this system. The Design, Construction, and Operation of Long-Distance High-Voltage

359

Electric System Update: Sunday August 17, 2003 | Department of...  

Broader source: Energy.gov (indexed) [DOE]

electric transmission system is now operating reliably. All electric power transmission lines that were removed from service during the blackout on August 14, 2003, have been...

360

Service Systems Engineering: New Course Development -Service Systems Operations Dana M. Johnson(1)  

E-Print Network [OSTI]

008-0523 Service Systems Engineering: New Course Development - Service Systems Operations Dana M La Jolla, California, U.S.A. May 9 to May 12, 2008 #12;Service Systems Engineering: New Course Development - Service Systems Operations Abstract A new curriculum in Service Systems Engineering, which

Onder, Nilufer

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Final Report Navajo Transmission Project (NTP)  

SciTech Connect (OSTI)

The Din Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

Bennie Hoisington; Steven Begay

2006-09-14T23:59:59.000Z

362

Investigating alternative concepts of operations for a maritime security system of systems  

E-Print Network [OSTI]

For complex systems of systems, such as those required to perform maritime security, system architects have numerous choices they may select from, both in the components and in the way the system operates. Component choices, ...

Mekdeci, Brian Anthony

363

University of Hawaii Advisory Task Group -Operational Assessment Report on System Level Administration Operating Policies and Practices  

E-Print Network [OSTI]

#12;University of Hawaii ­ Advisory Task Group - Operational Assessment Report on System Level on System Level Administration Operating Policies and Practices page 2 B. Ensure clear lines of authority an Operational Assessment at the System Level of the University. For purposes of this assessment, "System Level

364

Water Distribution and Wastewater Systems Operators (North Dakota) |  

Broader source: Energy.gov (indexed) [DOE]

Water Distribution and Wastewater Systems Operators (North Dakota) Water Distribution and Wastewater Systems Operators (North Dakota) Water Distribution and Wastewater Systems Operators (North Dakota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State North Dakota Program Type Siting and Permitting All public water supply and wastewater disposal systems are subject to classification and regulation by the State of North Dakota, and must obtain certification from the State Department of Health

365

Select an Operating System on PDSF Using CHOS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Chos Chos Chos PDSF is running Scientific Linux 6.2 as its native operating system. The native operation system is not intended for general use. Instead, the chos utility is used to create a Scientific Linux 5.3 (sl53) environment on both the interactive nodes and in batch. sl53 is the default and is what you will get if you just login without a .chos file. To automatically select a system version you need to create a file in your home directory named .chos (with the dot at the beginning). In this file you should have one and only one line: In your .chos file: The operating system you get: sl53 64-bit Scientific Linux 5.3 sl62 64-bit Scientific Linux 6.2 sl64 64-bit Scientific Linux 6.4 When you log in you should have a full, working environment with the system

366

Operational test report -- Project W-320 cathodic protection systems  

SciTech Connect (OSTI)

Washington Administrative Code (WAC) 173-303-640 specifies that corrosion protection must be designed into tank systems that treat or store dangerous wastes. Project W-320, Waste Retrieval Sluicing System (WRSS), utilizes underground encased waste transfer piping between tanks 241-C-106 and 241-AY-102. Corrosion protection is afforded to the encasements of the WRSS waste transfer piping through the application of earthen ionic currents onto the surface of the piping encasements. Cathodic protection is used in conjunction with the protective coatings that are applied upon the WRSS encasement piping. WRSS installed two new two rectifier systems (46 and 47) and modified one rectifier system (31). WAC 173-303-640 specifies that the proper operation of cathodic protection systems must be confirmed within six months after initial installation. The WRSS cathodic protection systems were energized to begin continuous operation on 5/5/98. Sixteen days after the initial steady-state start-up of the WRSS rectifier systems, the operational testing was accomplished with procedure OTP-320-006 Rev/Mod A-0. This operational test report documents the OTP-320-006 results and documents the results of configuration testing of integrated piping and rectifier systems associated with the W-320 cathodic protection systems.

Bowman, T.J.

1998-06-16T23:59:59.000Z

367

Linkages between demand-side management and congestion in the European electricity transmission system  

Science Journals Connector (OSTI)

Abstract We evaluate the possibility to reduce congestion in the transmission grid through large-scale implementation of demand-side management (DSM) in the form of load shifting for the EU-27 countries, Norway, and Switzerland for Year 2020. A linear, cost-minimising, dispatch model that includes a DC load-flow description of the transmission system and a general representation of load shifting is used. It is assumed that the EU Member States fulfil the targets for Year 2020 in their national renewable energy action plans. In the model calculations, a reference case without load shifting is compared with cases in which the load shifting is 5%, 10%, 15% or 20% of the load. The possibility to shift load in time is added exogenously and economic incentives for DSM are not evaluated. Three types of congestion are identified: peak-load-hour congestion, low-load-hour congestion and all-hour congestion. Peak-load-hour congestion is reduced as the DSM share of the load increases, whereas low-load-hour congestion, which is typically associated with a high level of wind generation, persists at all the DSM penetration levels investigated. We show that all-hour congestion occurs between systems that have large differences in supply structure, and that the impact of DSM on all-hour congestion is low.

Lisa Gransson; Joel Goop; Thomas Unger; Mikael Odenberger; Filip Johnsson

2014-01-01T23:59:59.000Z

368

Bibliography on transmission access issues  

SciTech Connect (OSTI)

This paper presents a bibliography on issues related to transmission access in electric power systems. There are 233 citations referenced in this bibliography. This bibliography presents a collection of selected literature on issues related to transmission access. It does not contain all of the material available on this subject or the categories contained herein. Some readers may feel that citations within this bibliography should be strictly limited to transmission system issues and not include energy pricing or reliability issues. However, it was the decision of the Subcommittee of the IEEE Task Force on Transmission Access and Nonutility Generation that selected entries relating to reliability and energy pricing, most relevant to transmission access, should be included. This decision was made because certain issues relating to reliability, transmission and energy pricing are perceived by the industry to be critical in the discussion of transmission access. The bibliography has been divided into the following sections or sub-sections: 2.0 Operational (Engineering) Issues, 3.0 Planning, 4.0 Reliability, 5.1 Economics: Costing, 5.2(a) Economics: Location-Differentiated Pricing, 5.2(b) Economics: Time-Differentiated Pricing, 5.3 Economics: Brokering, Bidding, and Auctioning, 6.0 Regulatory, and 7.0 General. Although the content of many publications spanned two or more of these sections, the desire to limit document length required that all publications be placed in the single most appropriate section. Publications are sorted according to author or publication resource.

Lankford, C.B. [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States)] [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States); McCalley, J.D. [Iowa State Univ., Ames, IA (United States)] [Iowa State Univ., Ames, IA (United States); Saini, N.K. [Entergy Services Corp., Metairie, LA (United States)] [Entergy Services Corp., Metairie, LA (United States)

1996-02-01T23:59:59.000Z

369

Record of Decision for the Transmission System Vegetation Management Program (DOE/EIS-0285) (07/00)  

Broader source: Energy.gov (indexed) [DOE]

SYSTEM VEGETATION SYSTEM VEGETATION MANAGEMENT PROGRAM Record of Decision DOE/EIS-0285 Cooperating Agencies J U L Y 2 0 0 0 Bonneville Power Administration Transmission System Vegetation Management Program Record of Decision Table of Contents Summary of Decision .................................................................................................................................... 1 For Further Information .............................................................................................................................. 2 Background ................................................................................................................................................... 3 Decisions ........................................................................................................................................................

370

Development Of Algorithms For Improved Planning And Operation Of Deregulated Power Systems.  

E-Print Network [OSTI]

??Transmission pricing and congestion management are two important aspects of modern power sectors working under a deregulated environment or moving towards a deregulated system (open (more)

Surendra, S

2012-01-01T23:59:59.000Z

371

Optimization of Fuel Cell System Operating Conditions for Fuel Cell Vehicles  

E-Print Network [OSTI]

ip t Fig. 1 M an Water Management Motor Thermal Managementwater an us cr and transmission, and fuel cell system. The motor

Zhao, Hengbing; Burke, Andy

2008-01-01T23:59:59.000Z

372

(DOE/EIS-0285/SA-41): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Broader source: Energy.gov (indexed) [DOE]

February 27, 2002 February 27, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-41) William Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management around wood poles in Transmission Line ROW's in the Walla Walla Region (see attached checklist for identification). The proposed work will be accomplished in the indicated sections of the transmission line corridors with the easement width ranging from 0 to 200 feet. Location: The ROWs are located in Walla Walla Region (see checklist). Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation around

373

Generation and Transmission Maximization Model | Open Energy Information  

Open Energy Info (EERE)

Generation and Transmission Maximization Model Generation and Transmission Maximization Model Jump to: navigation, search Tool Summary Name: Generation and Transmission Maximization Model Agency/Company /Organization: Argonne National Laboratory Sector: Energy Topics: Pathways analysis Resource Type: Software/modeling tools User Interface: Desktop Application Website: www.dis.anl.gov/projects/Gtmax.html Cost: Paid Generation and Transmission Maximization Model Screenshot References: Generation and Transmission Maximization Model [1] Logo: Generation and Transmission Maximization Model The GTMax model helps researchers study complex marketing and system operational issues. With the aid of this comprehensive model, utility operators and managers can maximize the value of the electric system, taking into account not only its limited energy and transmission resources,

374

Solid Waste Operations Complex (SWOC) Facilities Sprinkler System Hydraulic Calculations  

SciTech Connect (OSTI)

The attached calculations demonstrate sprinkler system operational water requirements as determined by hydraulic analysis. Hydraulic calculations for the waste storage buildings of the Central Waste Complex (CWC), T Plant, and Waste Receiving and Packaging (WRAP) facility are based upon flow testing performed by Fire Protection Engineers from the Hanford Fire Marshal's office. The calculations received peer review and approval prior to release. The hydraulic analysis program HASS Computer Program' (under license number 1609051210) is used to perform all analyses contained in this document. Hydraulic calculations demonstrate sprinkler system operability based upon each individual system design and available water supply under the most restrictive conditions.

KERSTEN, J.K.

2003-07-11T23:59:59.000Z

375

Earned Value Management System (EVMS) Surveillance Standard Operating Procedure  

Broader source: Energy.gov (indexed) [DOE]

System (EVMS) System (EVMS) Surveillance Standard Operating Procedure (ESSOP) Issued by Office of Acquisition and Project Management MA-63 September 30, 2013 V2 DEPARTMENT OF ENERGY Office of Acquisition and Project Management (OAPM) EVMS SURVEILLANCE SOP (ESSOP) SEPTEMBER 30, 2013 ii Earned Value Management System (EVMS) Surveillance Standard Operating Procedure (ESSOP) OPR: MA-63 Update V2: September 30, 2013 1. PURPOSE. This EVMS Surveillance Standard Operating Procedure (ESSOP) serves as a primary reference for OAPM MA-63 when conducting EVM System-level assessments. DOE Order (O) 413.3B, the Office of Management and Budget (OMB) Circular A-11, and the Federal Acquisition Regulations (FAR) require implementation of an EVMS on DOE capital asset

376

Argo: An exascale operating system | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Argo: An exascale operating system Argo: An exascale operating system Architecture overview of Argo Architecture overview of Argo Argo is a new exascale operating system and runtime system designed to support extreme-scale scientific computation. It is built on an agile, new modular architecture that supports both global optimization and local control. It aims to efficiently leverage new chip and interconnect technologies while addressing the new modalities, programming environments, and workflows expected at exascale. It is designed from the ground up to run future high-performance computing applications at extreme scales. At the heart of the project are four key innovations: dynamic reconfiguring of node resources in response to workload, allowance for massive concurrency, a hierarchical framework for power and fault management, and a

377

DESIGN AND IMPLEMENTATION OF A SINGLE SYSTEM IMAGE OPERATING SYSTEM FOR AD HOC NETWORKS  

E-Print Network [OSTI]

DESIGN AND IMPLEMENTATION OF A SINGLE SYSTEM IMAGE OPERATING SYSTEM FOR AD HOC NETWORKS Hongzhou and implementation of a distributed operating system for ad hoc networks. Our system simplifies the programming of ad longevity by effectively distributing energy consumption and avoiding hotspots. 1 Introduction Ad hoc

Sirer, Emin Gun

378

Interactions between frequencydependent and vertical transmission in hostparasite systems  

Science Journals Connector (OSTI)

...frequency-dependent transmission to the total number...population over time. Solid line represents susceptible...fected via horizontal route and dot-dash-dot line is hosts infected via...coexistence when ver- tical transmission is possible. Including...

1997-01-01T23:59:59.000Z

379

CS 551: Operating Systems Design and Implementation This course introduces the students to the fundamental principles of operating systems design, and gives them  

E-Print Network [OSTI]

CS 551: Operating Systems Design and Implementation Objectives This course introduces the students to the fundamental principles of operating systems design, and gives them hands-on experience with operating systems installation, design and implementation. The students apply what they learned about operating systems design

Heller, Barbara

380

The Nevada railroad system: Physical, operational, and accident characteristics  

SciTech Connect (OSTI)

This report provides a description of the operational and physical characteristics of the Nevada railroad system. To understand the dynamics of the rail system, one must consider the system`s physical characteristics, routing, uses, interactions with other systems, and unique operational characteristics, if any. This report is presented in two parts. The first part is a narrative description of all mainlines and major branchlines of the Nevada railroad system. Each Nevada rail route is described, including the route`s physical characteristics, traffic type and volume, track conditions, and history. The second part of this study provides a more detailed analysis of Nevada railroad accident characteristics than was presented in the Preliminary Nevada Transportation Accident Characterization Study (DOE, 1990).

NONE

1991-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Optimum Operation of In-Plant Cogeneration Systems  

E-Print Network [OSTI]

and their parent company, ICI PLC, have developed and applied systems to achieve these optimization objectives. Both on-line and off-line systems have been installed. These systems can solve the optimization problem quickly and in real time, yielding... profit margins are among the factors that have forced Imperial Chemical Industries (ICI PLC) to improve the operating economics of their existing chemical plants. The company has tackled this problem by coupling commercial and cost information...

Craw, I. A.; Foster, D.; Reidy, K. D.

382

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana  

Broader source: Energy.gov [DOE]

This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations.

383

OBSERVERS BASED SYNCHRONIZATION AND INPUT RECOVERY FOR A CLASS OF CHAOTIC SYSTEMS. APPLICATION TO IMAGE TRANSMISSION  

E-Print Network [OSTI]

TO IMAGE TRANSMISSION Estelle Cherrier, , Jos´e Ragot , CRAN UMR 7039 / Nancy-Universit´e, CNRS 2 Avenue transmission as an application of a chaotic cryptosystem. The underlying problem concerns nonlinear state on the message. Efficiency of the proposed approach is shown through an image transmission. 1. INTRODUCTION

Boyer, Edmond

384

State of the art analysis of online fault location on AC cables in underground transmission systems  

E-Print Network [OSTI]

, such as 400 kV transmission lines, will also be undergrounded gradually as more experience is gath- ered of underground cables for the transmission level. In Denmark, as a leading country, the entire 150 kV and 132 kV on transmission level fault location methods have been focused on overhead lines. Because of the very different

Bak, Claus Leth

385

Probabilistic Approach to Quantifying the Contribution of Variable Generation and Transmission to System Reliability: Preprint  

SciTech Connect (OSTI)

The increasing electrical load served by variable generation (VG), such as wind and solar energy, in the United States and many other countries has stimulated an interesting line of research to better quantify the capacity value of these resources. Methods applied traditionally to thermal units based on their average outage rates do not apply to VG because of their uncertain and non-dispatchable nature. The North American Electric Reliability Corporation's Integration of Variable Generation Task Force recently released a report that highlighted the need to develop and benchmark underlying loss-of-load expectation and related metrics that reasonably and fairly calculate the contribution to planning reserves, or capacity value, of solar and wind power. As the fraction of generation coming from VG becomes more significant, their estimated capacity value will have a larger impact on system planning. In this paper, we provide a method to include VG in traditional probabilistic-based adequacy methods. This method has been implemented in the Renewable Energy Probabilistic Resource Assessment tool developed at the National Renewable Energy Laboratory. Through an example based on the U.S. Western Interconnection, this method is applied to assess the effect that transmission can have on resource adequacy. We also analyze the interactions between available transmission and capacity value for VG.

Ibanez, E.; Milligan, M.

2012-09-01T23:59:59.000Z

386

Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-08  

SciTech Connect (OSTI)

Clearing C-trees along the south side of the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The project involves controlling all tall growing trees (C-Trees) within the right-of-way. All work is to be done on the south side of centerline. Target vegetation is the tall growing Firs along the edge of the ROW, all of which is located within the back yards of the property owners along the right-of-way. The density of vegetation is low and consists of C-Trees located within backyards, with the branches growing towards the lines. Due to lack of access and past verbal agreements with the landowners, permission/agreement has been difficult to obtain from the property owners. Permission has now been obtained to remove the C-Trees within their back yards which, will soon be a hazard to our transmission line facility. We are working with the landowners to get them to plant low growing scrubs and ornamentals within the right-of-way and adjacent to the right-of-way. A follow up herbicide treatment is not planned because the trees being cut will not re-sprout. This right-of-way or project area is on a three to four year maintenance schedule. Little or no treatment should be required in the immediate future.

N /A

2001-04-23T23:59:59.000Z

387

Detecting nonclassical system-environment correlations by local operations  

E-Print Network [OSTI]

We develop a general strategy for the detection of nonclassical system-environment correlations in the initial states of an open quantum system. The method employs a dephasing map which operates locally on the open system and leads to an experimentally accessible witness for genuine quantum correlations, measuring the Hilbert-Schmidt distance between pairs of open system states. We further derive the expectation value of the witness for various random matrix ensembles modeling generic features of complex quantum systems. This expectation value is shown to be proportional to a measure for the quantum discord which reduces to the concurrence for pure initial states.

Manuel Gessner; Heinz-Peter Breuer

2011-08-12T23:59:59.000Z

388

Designing a new operating system for exascale architectures | Argonne  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Designing a new operating system for exascale architectures Designing a new operating system for exascale architectures August 7, 2013 Tweet EmailPrint Argonne National Laboratory has been awarded a grant from the Department of Energy Office of Science to lead Argo, a multi-institutional research project to design and develop a platform-neutral prototype of an exascale operating system and runtime software. Researchers in Argonne's Mathematics and Computer Science Division will collaborate with scientists from Pacific Northwest National Laboratory and Lawrence Livermore National Laboratory, as well as with several universities nationwide, on the three-year, $9.75 million project. The world's fastest computers have proved essential for scientific discoveries, spanning from designing new materials to understanding the

389

Customer system efficiency improvement assessment: Supply curves for transmission and distribution conservation options  

SciTech Connect (OSTI)

This report documents the results of Task 6 in the Customer System Efficiency Improvement (CSEI) Assessment Project. A principal objective of this project is to assess the potential for energy conservation in the transmission and distribution (TandD) systems of electric utilities in the BPA service area. The scope of this assessment covers BPA customers in the Pacific Northwest region and all non-federal TandD systems, including those that currently place no load on the BPA system. Supply curves were developed to describe the conservation resource potentially available from TandD-system efficiency improvements. These supply curves relate the levelized cost of upgrading existing equipment to the estimated amount of energy saved. Stated in this form, the resource represented by TandD loss reductions can be compared with other conservation options and regional electrical generation resources to determine the most cost-effective method of supplying power to the Pacific Northwest. The development of the supply curves required data acquisition and methodology development that are also described in this report. 11 refs., 11 figs., 16 tabs.

Tepel, R.C.; Callaway, J.W.; De Steese, J.G.

1987-11-01T23:59:59.000Z

390

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

391

Method for operating a combustor in a fuel cell system  

DOE Patents [OSTI]

In one aspect, the invention provides a method of operating a combustor to heat a fuel processor to a desired temperature in a fuel cell system, wherein the fuel processor generates hydrogen (H.sub.2) from a hydrocarbon for reaction within a fuel cell to generate electricity. More particularly, the invention provides a method and select system design features which cooperate to provide a start up mode of operation and a smooth transition from start-up of the combustor and fuel processor to a running mode.

Clingerman, Bruce J. (Palmyra, NY); Mowery, Kenneth D. (Noblesville, IN)

2002-01-01T23:59:59.000Z

392

(DOE/EIS-0285/SA-120): Supplement Analysis for the Transmission System Vegetation Management Program FEISq 2/10/03  

Broader source: Energy.gov (indexed) [DOE]

0, 2003 0, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-120 Hanford-Ostrander Corridor Maintenance William Erickson TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management for the Hanford-Ostrander Transmission Line Corridor from Tower 10/4 to Tower 17/2 + 770. The line is a 500kV Single Circuit Transmission Line having an easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as referenced on the attached checklist. Location: The subject right-of-way is located in Benton County, WA. In the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

393

(DOE/EIS-0285/SA-119): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/29/03  

Broader source: Energy.gov (indexed) [DOE]

9, 2003 9, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Snohomish-Murray No. 1 Transmission Line from structure 2/6 through structure 18/6. Right of way width is 95 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will

394

(DOE/EIS-0285/SA=32): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (11/15/01)  

Broader source: Energy.gov (indexed) [DOE]

November 15, 2001 November 15, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-32) Bill Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Re-vegetation Plot Study along the Lower Monumental-McNary Transmission Line ROW. The study area sections are located near structures 38/4 and 39/3. The line is a 500kV Single Circuit Transmission Line having an easement width of 165 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as indicated on the attached checklist. Location: The ROW is located in Walla Walla County, WA being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

395

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20)(8/2/01)  

Broader source: Energy.gov (indexed) [DOE]

2, 2001 2, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20) Bill Erickson - TFP/Walla Walla - Natural Resource Specialist Jim Jellison - TFO/Olympia - Natural Resource Specialist Proposed Action: Vegetation Management along the McNary-Ross 161/1 to 166/5+346 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 175 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Clark County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

396

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-33)(11/27/01)  

Broader source: Energy.gov (indexed) [DOE]

November 27, 2001 November 27, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS- 0285/SA-33) Bill Erickson - TFP/Walla Walla Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the St Helens-Allston Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line having an easement width of 100 feet. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear danger trees from varying widths of the indicated transmission line right-of-way that are approaching electrical clearance zones in accordance

397

(DOE/EIS-0285/SA-105): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (08/22/02)  

Broader source: Energy.gov (indexed) [DOE]

2, 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 105 Elbe Tap to Alder-LaGrande No. 1 James Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elbe Tap to Alder-LaGrande No.1 and 115kV transmission line from structure 1/1 through structure 7/17. Corridor width varies. The project area is located within Whatcom County, Washington. Location: Transmission line is located at and west of Elbe, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing

398

The Initial Development of a Computerized Operator Support System  

SciTech Connect (OSTI)

A computerized operator support system (COSS) is a collection of resilient software technologies to assist operators in monitoring overall nuclear power plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast- moving, complex events. A prototype COSS for a chemical volume control system at a nuclear power plant has been developed in order to demonstrate the concept and provide a test bed for further research. The development process identified four underlying elements necessary for the prototype, which consist of a digital alarm system, computer-based procedures, piping and instrumentation diagram system representations, and a recommender module for mitigation actions. An operational prototype resides at the Idaho National Laboratory (INL) using the U.S. Department of Energys (DOE) Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). Several human-machine interface (HMI) considerations are identified and incorporated in the prototype during this initial round of development.

Roger Lew; Ronald L Boring; Thomas A Ulrich; Ken Thomas

2014-08-01T23:59:59.000Z

399

EC Transmission Line Risk Identification and Analysis  

SciTech Connect (OSTI)

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

400

SYSTEM PLANNING WITH THE HANFORD WASTE OPERATIONS SIMULATOR  

SciTech Connect (OSTI)

At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

CRAWFORD TW; CERTA PJ; WELLS MN

2010-01-14T23:59:59.000Z

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

High-power microwave transmission systems for electron-cyclotron-resonance plasma heating  

SciTech Connect (OSTI)

This progress report is for the sixth year of a grant from the US Department of Energy for the design, development, and fabrication of ECRH transmission and mode conversion systems to transport microwave power from a gyrotron to a magnetically confined plasma. The design and low-power testing of new and improved components for such systems and development of underlying theory is the focus of this project. Devising and improving component testing and diagnostic techniques is also an important part of this effort. The development of possible designs for sections of gyrotrons themselves, such as tapers or Vlasov-type launchers, in support of the Varian gyrotron development program is also considered when appropriate. We also provide support to other groups working on ECR heating of magnetically confined plasmas such as the groups at General Atomics, the University of Texas at Austin, and Lawrence Livermore National Laboratory. During the last year, we designed and had fabricated a two-dimensional Vlasov antenna system for a 110 GHz TE{sub 15,2} mode gyrotron for possible use at General Atomics. The system included the launcher section, a visor, main reflector, and focusing reflector. Programs to generate the tool-path profiles to cut the General Atomics'' Vlasov components on a milling machine were developed. We have also developed state-of-the art theory and programs for three-dimensional whispering-gallery-mode Vlasov antenna systems. A design for a 110 GHz TE{sub 01}-TE{sub 15,2} mode converter system for cold testing WGM Vlasov antenna systems was developed and is currently being fabricated also.

Vernon, R.J.

1991-08-01T23:59:59.000Z

402

EAST ion cyclotron resonance heating system for long pulse operation  

Science Journals Connector (OSTI)

Abstract Radio frequency (RF) power in the ion cyclotron range of frequencies (ICRF) is one of the primary auxiliary heating techniques for Experimental Advanced Superconducting Tokamak (EAST). The ICRF system for EAST has been developed to support long-pulse high-? advanced tokamak fusion physics experiments. The ICRF system is capable of delivering 12MW 1000-s RF power to the plasma through two antennas. The phasing between current straps of the antennas can be adjusted to optimize the RF power spectrum. The main technical features of the ICRF system are described. Each of the 8 ICRF transmitters has been successfully tested to 1.5MW for a wide range of frequency (2570MHz) on a dummy load. Part of the ICRF system was in operation during the EAST 2012 spring experimental campaign and a maximum power of 800kW (at 27MHz) lasting for 30s has been coupled for long pulse H mode operation.

Y.P. Zhao; X.J. Zhang; Y.Z. Mao; S. Yuan; D.Y. Xue; X. Deng; L. Wang; S.Q. Ju; Y. Cheng; C.M. Qin; G. Chen; Y. Lin; J.G. Li; B.N. Wan; Y.T. Song; F. Braun; R. Kumazawa; S. Wukitch

2014-01-01T23:59:59.000Z

403

On Predictable Operating System Protocol Processing Clifford W. Mercer, Jim Zelenka, and Ragunathan Rajkumar  

E-Print Network [OSTI]

On Predictable Operating System Protocol Processing Clifford W. Mercer, Jim Zelenka, and Ragunathan, protocol processing, resource reservation, operating systems, predictability, reservation, admission that incorporate digital audio and video require predictable response from the operating system and the network

404

Sustained Performance and Some Effects on the Design and Operation of Complex Systems  

Science Journals Connector (OSTI)

...Effects on the Design and Operation of Complex Systems M. F. Allnutt D. R. Haslam...the military man-machine system, must often operate for...effects on the design and operation of complex systems. | Man, increasingly the...

1990-01-01T23:59:59.000Z

405

Optimization of Fuel Cell System Operating Conditions for Fuel Cell Vehicles  

E-Print Network [OSTI]

to achieve stable system operation and maximum fuel economy.optimizing the fuel cell system operation and the sizing ofoptimize the fuel cell system operation over the full load

Zhao, Hengbing; Burke, Andy

2008-01-01T23:59:59.000Z

406

Fuzzy logic based operated device identification in power distribution systems  

E-Print Network [OSTI]

of an operated device identification algorithm to be used as one of four modules in an automated modular scheme for fault section estimation on radial distribution systems. This algorithm will be executed in tandem with the other fault location modules that form...

Manivannan, Karthick Muthu

2002-01-01T23:59:59.000Z

407

Century Electric Distribution System Operations Lorenzo Kristov,1  

E-Print Network [OSTI]

May 2014 1 21st Century Electric Distribution System Operations Lorenzo Kristov,1 California adoption of distribution energy technologies. All of this has occurred during a period of increasing of Renewable and Distributed Energy Resources, Caltech Resnick Institute, 2012 #12;May 2014 2 and wholesale

Low, Steven H.

408

Operation and Control of Full Ice-storage System  

E-Print Network [OSTI]

In a dividing time ice-storage system, the refrigerator does not operate during power's on-peak period, and all the cooling is supplied by the ice stored in off-peak period, so that the use of electricity can be maintained. When the ice is thawing...

Liu, Q.; Liu, Y.

2006-01-01T23:59:59.000Z

409

Development of a surface conductivity measurement system for ultrahigh vacuum transmission electron microscope  

SciTech Connect (OSTI)

The surface conductivity measurement system using a micro-four-point probe (M4PP) had been developed for the ultrahigh vacuum transmission electron microscope (UHV-TEM). Since the current distribution in the sample crystals during the current voltage measurement by the M4PP is localized within the depth of several micrometers from the surface, the system is sensitive to the surface conductivity, which is related with the surface superstructure. It was installed in the main chamber of the TEM and the surface conductivity can be measured in situ. The surface structures were observed by reflection electron microscopy and diffraction (REM-RHEED). REM-RHEED enables us to observe the surface superstructures and their structure defects such as surface atomic steps and domain boundaries of the surface superstructure. Thus the effects of the defects on the surface conductivity can be investigated. In the present paper we present the surface conductivity measurement system and its application to the Si(111)-{radical}(3)x{radical}(3)-Ag surface prepared on the Si(111) vicinal surfaces. The result clearly showed that the surface conductivity was affected by step configuration.

Minoda, H. [Department of Applied Physics, Tokyo University of Agriculture and Technology, Koganei, Tokyo 184-8588 (Japan); CREST, Japan Science and Technology Agency, Kawaguchi, Saitama 332-0012 (Japan); Hatano, K.; Yazawa, H. [Department of Applied Physics, Tokyo University of Agriculture and Technology, Koganei, Tokyo 184-8588 (Japan)

2009-11-15T23:59:59.000Z

410

Hanford Environmental Information System (HEIS) Operator`s Manual. Volume 1  

SciTech Connect (OSTI)

The Hanford Environmental Information System (HEIS) is a consolidated set of automated resources that effectively manage the data gathered during environmental monitoring and restoration of the Hanford Site. The HEIS includes an integrated database that provides consistent and current data to all users and promotes sharing of data by the entire user community. This manual describes the facilities available to the operational user who is responsible for data entry, processing, scheduling, reporting, and quality assurance. A companion manual, the HEIS User`s Manual, describes the facilities available-to the scientist, engineer, or manager who uses the system for environmental monitoring, assessment, and restoration planning; and to the regulator who is responsible for reviewing Hanford Site operations against regulatory requirements and guidelines.

Schreck, R.I.

1991-10-01T23:59:59.000Z

411

Evaluation of power system security and development of transmission pricing method.  

E-Print Network [OSTI]

??The electric power utility industry is presently undergoing a change towards the deregulated environment. This has resulted in unbundling of generation, transmission and distribution services. (more)

Kim, Hyungchul

2004-01-01T23:59:59.000Z

412

HEMP emergency planning and operating procedures for electric power systems  

SciTech Connect (OSTI)

Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

1991-01-01T23:59:59.000Z

413

Feasibility study for a transportation operations system cask maintenance facility  

SciTech Connect (OSTI)

The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1991-01-01T23:59:59.000Z

414

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Broader source: Energy.gov (indexed) [DOE]

Statement Statement DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (DOE/EIS-0285) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy Cooperating Agencies: U.S. Forest Service (FS), U.S. Department of Agriculture; Bureau of Land Management (BLM), U.S. Department of Interior Title of Proposed Action: Transmission System Vegetation Management Program States Involved: California, Idaho, Montana, Oregon, Utah, Washington, and Wyoming Abstract: Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation.

415

Public street lighting remote operation and supervision system  

Science Journals Connector (OSTI)

Abstract Public street lighting system consists of devices distributed in points of light and a supervision and control application. The system architecture is modular and expandable. In developing the work the C# language is adopted to develop the operation and monitoring via standard CyberOPC and XML file types are applied to the device description and definition of the network topology. This paper describes the validation proposed and the results obtained attests that this applied methodology is feasible and can be applied to other public lighting systems.

Cleber Costa da Fonseca; Rodrigo Palucci Pantoni; Dennis Brando

2015-01-01T23:59:59.000Z

416

March 29, 2008 OS: OS Structures 1 Operating-Systems Structures  

E-Print Network [OSTI]

March 29, 2008 OS: OS Structures 1 Operating-Systems Structures #12;March 29, 2008 OS: OS Structures 2 Objectives To describe the services an operating system provides to users, processes, and other systems To discuss the various ways of structuring an operating system To explain how operating systems

Adam, Salah

417

An Open Source Laboratory for Operating Systems Projects Mark Claypool, David Finkel and Craig Wills *  

E-Print Network [OSTI]

1 An Open Source Laboratory for Operating Systems Projects Mark Claypool, David Finkel and Craig 100 Institute Road Worcester, MA 01609 Abstract Typical undergraduate operating systems projects use services provided by an operating system via system calls or develop code in a simulated operating system

Claypool, Mark

418

OPERATIONAL EXPERIENCE OF THE UPGRADED CRYOGENIC SYSTEMS AT THE NSCL  

SciTech Connect (OSTI)

The National Superconducting Cyclotron Laboratory (NSCL) is a NSF-supported facility, with additional support from Michigan State University (MSU) for conducting research in nuclear and accelerator science. The facility consists of two superconducting cyclotrons and over fifty individual cryostats, each containing several superconducting magnets that are used in the beam transport system. Beginning in 1999 a major facility upgrade was started. New, larger magnets were added, increasing the total 4.5 K loads, necessitating an increase of the cryogenic capacity. A helium plant (nominal 1750-Watt at 4.5 K) was acquired from the United States Bureau of Mines where it had been operating as a pure liquefier since the early 1980's. It was refurbished for the NSCL with extensive support from the cryogenics group at Thomas Jefferson National Laboratory. The new cryogenic system came online early in 2001. The cold-mass is relatively high in relation to the installed capacity, presenting challenges during cool downs. Reliability over the last five years has been greater than 99%. An overview of the last seven years of operations of our cryogenic systems is presented that includes normal operations, testing of new equipment, noteworthy breakdowns, routine maintenance, and system reliability.

McCartney, A. H.; Laumer, H. L.; Jones, S. A. [National Superconducting Cyclotron Laboratory, Michigan State University, East Lansing, MI, 48824 (United States)

2010-04-09T23:59:59.000Z

419

National Transmission Grid Study  

Broader source: Energy.gov (indexed) [DOE]

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

420

Chapter 4 Transmission Adequacy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners  

Broader source: Energy.gov [DOE]

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada border.

422

EIS-0499: Great Northern Transmission Line Project, Minnesota  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 750-megawatt electric transmission system across the U.S.-Canada border. The proposed 220 mile transmission line would cross the border near Roseau, Minnesota, and continue to Grand Rapids, Minnesota.

423

AN OPERATOR EXPERIENCE WITH A HIERARCHICAL REAL-TIME CONTROL SYSTEM (RCS)  

E-Print Network [OSTI]

AN OPERATOR EXPERIENCE WITH A HIERARCHICAL REAL-TIME CONTROL SYSTEM (RCS) Hui-Min Huang Mechanical@cme.nist.gov ABSTRACT The issue of operator interface in the RCS hierarchical control systems is the focus operators to be involved in system operations in different degrees. In some situations, the operators

424

Abstract--As a common tendency, large-scale wind farms are increasingly connected to the transmission system of modern  

E-Print Network [OSTI]

stability I. INTRODUCTION arge-scale wind power plants are increasingly integrated into the transmission regulation. For variable-speed wind turbines which are connected to the power system through power electronic convertors, one advantage is that the output active power and reactive power can be controlled separately

Chen, Zhe

425

Georgia System Operations Corporation Inc. Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Corporation Inc. Smart Grid Project Corporation Inc. Smart Grid Project Jump to: navigation, search Project Lead Georgia System Operations Corporation Inc. Country United States Headquarters Location Tucker, Georgia Recovery Act Funding $6,456,501.00 Total Project Value $12,913,003.00 Coverage Area Coverage Map: Georgia System Operations Corporation Inc. Smart Grid Project Coordinates 33.8545479°, -84.2171424° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

426

Single x-ray transmission system for bone mineral density determination  

SciTech Connect (OSTI)

Bones are the support of the body. They are composed of many inorganic compounds and other organic materials that all together can be used to determine the mineral density of the bones. The bone mineral density is a measure index that is widely used as an indicator of the health of the bone. A typical manner to evaluate the quality of the bone is a densitometry study; a dual x-ray absorptiometry system based study that has been widely used to assess the mineral density of some animals' bones. However, despite the success stories of utilizing these systems in many different applications, it is a very expensive method that requires frequent calibration processes to work properly. Moreover, its usage in small species applications (e.g., rodents) has not been quite demonstrated yet. Following this argument, it is suggested that there is a need for an instrument that would perform such a task in a more reliable and economical manner. Therefore, in this paper we explore the possibility to develop a new, affordable, and reliable single x-ray absorptiometry system. The method consists of utilizing a single x-ray source, an x-ray image sensor, and a computer platform that all together, as a whole, will allow us to calculate the mineral density of the bone. Utilizing an x-ray transmission theory modified through a version of the Lambert-Beer law equation, a law that expresses the relationship among the energy absorbed, the thickness, and the absorption coefficient of the sample at the x-rays wavelength to calculate the mineral density of the bone can be advantageous. Having determined the parameter equation that defines the ratio of the pixels in radiographies and the bone mineral density [measured in mass per unit of area (g/cm{sup 2})], we demonstrated the utility of our novel methodology by calculating the mineral density of Wistar rats' femur bones.

Jimenez-Mendoza, Daniel; Vargas-Vazquez, Damian [Division de Investigacion y Posgrado, Facultad de Ingenieria, Universidad Autonoma de Queretaro, Cerro de las Campanas s/n., C.P. 76010, Queretaro, Qro. (Mexico); Espinosa-Arbelaez, Diego G. [Posgrado en Ciencia e Ingenieria en Materiales, Instituto de Investigaciones en Materiales, Universidad Nacional Autonoma de Mexico, Av. Universidad 3000, C.P. 04510, Coyoacan, Mexico D.F. (Mexico); Departamento de Nanotecnologia, Centro de Fisica Aplicada y Tecnologia Avanzada, Universidad Nacional Autonoma de Mexico, Campus Juriquilla, Boulevard Juriquilla 3001, C.P. 76230, A.P. 1-1010, Juriquilla, Qro. (Mexico); Giraldo-Betancur, Astrid L. [Centro de Investigacion y de Estudios Avanzados del Instituto Politecnico Nacional, Libramiento Norponiente 2000, C.P. 76230, Fracc. Real de Juriquilla, Qro. (Mexico); Hernandez-Urbiola, Margarita I. [Posgrado en Investigaciones Biomedicas, Universidad Nacional Autonoma de Mexico, Campus Juriquilla, Boulevard Juriquilla 3001, C.P. 76230, A.P. 1-1010, Juriquilla, Qro. (Mexico); Departamento de Nanotecnologia, Centro de Fisica Aplicada y Tecnologia Avanzada, Universidad Nacional Autonoma de Mexico, Campus Juriquilla, Boulevard Juriquilla 3001, C.P. 76230, A.P. 1-1010, Juriquilla, Qro. (Mexico); Rodriguez-Garcia, Mario E. [Departamento de Nanotecnologia, Centro de Fisica Aplicada y Tecnologia Avanzada, Universidad Nacional Autonoma de Mexico, Campus Juriquilla, Boulevard Juriquilla 3001, C.P. 76230, A.P. 1-1010, Juriquilla, Qro. (Mexico)

2011-12-15T23:59:59.000Z

427

Surreptitious security violation in the MVS operating system  

Science Journals Connector (OSTI)

Even in the well-protected IBM MVS operating system users can force breaches in the standard protection mechanisms and obtain control over the entire installation regardless of RACF or TOP SECRET protection software. This paper encourages computing center management to appoint security officers to prevent and detect security violations. The need for these officers will be demonstrated as a consequence of the violations shown.

Ronal Paans; Guus Bonnes

1983-01-01T23:59:59.000Z

428

Disco: Running Commodity Operating Systems on Scalable Multiprocessors Proceedings of the 16th Symposium on Operating Systems Principles (SOSP). SaintMalo, France. October 1997.  

E-Print Network [OSTI]

Page 1 Disco: Running Commodity Operating Systems on Scalable Multiprocessors Proceedings of the 16th Symposium on Operating Systems Principles (SOSP). Saint­Malo, France. October 1997. In this paper we examine the problem of extending modern operating systems to run efficiently on large­scale shared

Krishnamurthy, Arvind

429

Page 1Disco: Running Commodity Operating Systems on Scalable Multiprocessors Proceedings of the 16th Symposium on Operating Systems Principles (SOSP). Saint-Malo, France. October 1997.  

E-Print Network [OSTI]

Page 1Disco: Running Commodity Operating Systems on Scalable Multiprocessors Proceedings of the 16th Symposium on Operating Systems Principles (SOSP). Saint-Malo, France. October 1997. In this paper run multiple copies of Silicon Graphics' IRIX operating system on a multiprocessor. Our experience

Han, Richard Y.

430

(DOE/EIS-0285/SA-36): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (01/22/02)  

Broader source: Energy.gov (indexed) [DOE]

24, 2002 24, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-38) Benjamin J. Tilley - TFE/Alvey Proposed Action: Vegetation Management along the Wendson-Tahkenith #1 & #2 1/1-20/4, Tahkenitch-Gardiner #1/1-2/3 and Tahkenitch-Reedsport #1/1-4/2 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 100 feet. Location: The ROW is located in Douglas and Lane County, OR, being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

431

(DOE/EIS-0285/SA-43): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Broader source: Energy.gov (indexed) [DOE]

February 27, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Lower Monumental - McNary 57/2 to 63/5, and Radar Tap 0/4 to 0/10 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 165 and 80 feet respectively. Location: The ROW is located in Umatilla and Franklin County, OR, being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

432

(DOE/EIS-0285/SA-59): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/19/02  

Broader source: Energy.gov (indexed) [DOE]

April 19, 2002 April 19, 2002 REPLY TO ATTN OF: KEP SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-59) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis Covington/ Raver Paul / Paul Alston 230 and 500 kV Transmission line Corridor ROW 48/2 to 70/6 and 1/1 to 13/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with a corridor width of 250 to 442 feet. Location: The ROW is located in Thurston County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

433

(DOE/EIS-0285/SA-02): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 3/9/01  

Broader source: Energy.gov (indexed) [DOE]

3/09/01 3/09/01 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-02) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Danger tree clearing on nine ROWs. Locations are: the Franklin-Badger Canyon #2; Hedges Tap; White Bluffs-Richland; Grandview-Richland; Badger Canyon-Richland; Franklin- Riverview; Taylor Flats Tap; Walla Walla-Pendleton; and McNary-Slatt Transmission lines. Location: All ROWs are located in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear danger trees from varying widths of the indicated transmission line rights-of way that are approaching electrical clearance zones in

434

Notice of Intent for the Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota (5/27/05)  

Broader source: Energy.gov (indexed) [DOE]

16 16 Federal Register / Vol. 70, No. 102 / Friday, May 27, 2005 / Notices Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Note that also there is an ''eSubscription'' link on the web site that enables subscribers to receive e- mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659. Comment Date: June 9, 2005. Magalie R. Salas, Secretary. [FR Doc. E5-2702 Filed 5-26-05; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Western Area Power Administration Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota

435

Coordination of Federal Authorizations for Electric Transmission  

Broader source: Energy.gov (indexed) [DOE]

Coordination of Federal Authorizations for Electric Transmission Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy ("DOE") for its ongoing commitment to implement the provisions of the Energy Policy Act of 2005 ("EPAct"), specifically, as addressed here, the DOE's continuing effort to establish procedures under which entities may request that DOE coordinate Federal authorizations for the siting of interstate transmission facilities. Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule

436

Effects of un-transposed UHV transmission line on fault analysis of power systems  

Science Journals Connector (OSTI)

The conventional fault analysis method based on symmetrical components supposes that the three-phase parameters of un-transposed transmission line are symmetrical in case of fault. The errors caused by the method...

Anning Wang ???; Qing Chen ? ?; Zhanping Zhou ???

2008-06-01T23:59:59.000Z

437

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

438

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network [OSTI]

stakeholders in transmission-line route planning and sitingan optimal transmission line route-finding tool. This tool

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

439

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-144-Custer-Intalco #2)  

Broader source: Energy.gov (indexed) [DOE]

4-Custer-Intalco #2) 4-Custer-Intalco #2) Don Atkinson Natural Resource Specialist - TFN/SNOHOMISH Proposed Action: Vegetation Management for portion of the Custer-Intalco #2 230 kV transmission line located from tower structure 1/1 to 7/5. Location: Project location is in BPA Snohomish Region in Whatcom County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the right-of- way, along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and

440

(DOE/EIS-0285/SA-12): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Broader source: Energy.gov (indexed) [DOE]

2) 2) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Olympia-Grand Coulee No.1 Transmission Line ROW. Location: The ROW is located in Pierce and King Counties, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

(DOE/EIS-0285//SA-80): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (07/01/02)  

Broader source: Energy.gov (indexed) [DOE]

SA80 SA80 Rocky Reach - Maple Valley Don Atkinson -- - TFN/Snohomish Bill Erickson -- - TFP/Walla Walla Proposed Action: Vegetation Management for USDA Forest Service Lands Along the Rocky Reach - Maple Valley Transmission Line. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along access roads and around tower structures on USDA Forest Service lands that may impede the operation and maintenance of the subject transmission line. See Section 1of the attached checklist for a complete description of the proposal. Analysis: Please see the attached checklist for the resources present. Applicable findings and mitigation measures are discussed below. Planning Steps: 1. Identify facility and the vegetation management need. Access roads (only) and tower sites (only) will be treated using non-selective methods

442

(DOE/EIS-0285/SA-125): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/18/03  

Broader source: Energy.gov (indexed) [DOE]

5 (Echo Lake-Maple Valley #1 [Mile 1-9], Adno 8258) 5 (Echo Lake-Maple Valley #1 [Mile 1-9], Adno 8258) Don Atkinson - TFN/SNOHOMISH Natural Resource Specialist Proposed Action: Vegetation Management for portion of the Echo Lake - Maple Valley #1 500 kV transmission line located from tower structure 1/1 to 9/2. Location: Project location is entirely within King county, Washington and is within the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and

443

(DOE/EIS-0285/SA-13): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/6/01  

Broader source: Energy.gov (indexed) [DOE]

3) 3) James Jellison - TFO/Olympia Region - Natural Resource Specialist Bill Erickson - TFP/Walla Walla Region - Natural Resource Specialist Proposed Action: Vegetation Management along the Naselle Tarlett #1 and #2 transmission line Right of Way (ROW). Location: The ROW is located in Pacific County, WA, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of

444

(DOE/EIS-0285/SA-10): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Broader source: Energy.gov (indexed) [DOE]

0) 0) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Covington-Duwamish No. 1 ROW from the Covington Substation to tower 10/4. Location: The ROW is located in King County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to

445

MACHINE PROTECTION SYSTEM FOR CONCURRENT OPERATION OF RHIC AND BLIP.  

SciTech Connect (OSTI)

The Brookhaven 200MeV linac is a multipurpose machine used to inject low intensity polarized protons for RHIC (Relativistic Heavy Ion Collider), as well as to inject high intensity protons to BLIP (Brookhaven Linac Isotope Producer), a medical isotope production facility. If high intensity protons were injected to RHIC by mistake, administrative radiation limits could be exceeded or sensitive electronics could be damaged. In the past, the changeover from polarized proton to high intensity proton operation has been a lengthy process, thereby never allowing the two programs to run simultaneously. To remedy this situation and allow concurrent operation of RHIC and BLIP, an active interlock system has been designed to monitor current levels in the AGS using two current transformers with fail safe circuitry and associated electronics to inhibit beam to RHIC if high intensity currents are detected.

WILINSKI, M.; BELLAVIA, S.; GLENN, J.W.; MAUSNER, L.F.; UNGER, K.L.

2005-05-16T23:59:59.000Z

446

Development of a Silicon Based Electron Beam Transmission Window for Use in a KrF Excimer Laser System  

SciTech Connect (OSTI)

The Princeton Plasma Physics Laboratory (PPPL), in collaboration with the Naval Research Laboratory (NRL), is currently investigating various novel materials (single crystal silicon, <100>, <110> and <111>) for use as electron-beam transmission windows in a KrF excimer laser system. The primary function of the window is to isolate the active medium (excimer gas) from the excitation mechanism (field-emission diodes). Chosen window geometry must accommodate electron energy transfer greater than 80% (750 keV), while maintaining structural integrity during mechanical load (1.3 to 2.0 atm base pressure differential, approximate 0.5 atm cyclic pressure amplitude, 5 Hz repetition rate) and thermal load across the entire hibachi area (approximate 0.9 W {center_dot} cm superscript ''-2''). In addition, the window must be chemically resistant to attack by fluorine free-radicals (hydrofluoric acid, secondary). In accordance with these structural, functional, and operational parameters, a 22.4 mm square silicon prototype window, coated with 500 nm thin-film silicon nitride (Si{sub 3}N{sub 4}), has been fabricated. The window consists of 81 square panes with a thickness of 0.019 mm {+-} 0.001 mm. Stiffened (orthogonal) sections are 0.065 mm in width and 0.500 mm thick (approximate). Appended drawing (Figure 1) depicts the window configuration. Assessment of silicon (and silicon nitride) material properties and CAD modeling and analysis of the window design suggest that silicon may be a viable solution to inherent parameters and constraints.

C.A. Gentile; H.M. Fan; J.W. Hartfield; R.J. Hawryluk; F. Hegeler; P.J. Heitzenroeder; C.H. Jun; L.P. Ku; P.H. LaMarche; M.C. Myers; J.J. Parker; R.F. Parsells; M. Payen; S. Raftopoulos; J.D. Sethian

2002-11-21T23:59:59.000Z

447

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

448

Comparison of emerging metaheuristic algorithms for optimal hydrothermal system operation  

Science Journals Connector (OSTI)

Abstract Optimal hydrothermal system operation (OHSO) is one of the complex and hard-to-solve problems in power system field due to its nonlinear, dynamic, stochastic, non-separable and non-convex nature. Traditionally, this problem has been solved through classical optimization algorithms, which require some approximations to tackle a more tractable variant of the original problem formulation. Metaheuristic optimization has undergone a significant development in recent years, thus, there is a variety of tools with different conceptual differences, which offer a great potential for solving OHSO without extensive simplifications. This paper provides a comparative study on the application of six emerging metaheuristic algorithms to OHSO, namely, the Comprehensive Learning Particle Swarm Optimizer (CLPSO), Genetic algorithm with Multi-Parent Crossover (GA-MPC), Differential Evolution with Adaptive Crossover Operator (DE-ACO), Covariance Matrix Adaptation Evolution Strategy (CMA-ES), Linearized Biogeography-based Optimization (LBBO), and the Hybrid Median-Variance Mapping Optimization (MVMO-SH). Since these tools have been successfully applied to other hard-to-solve optimization problems, the goal is to ascertain their effectiveness when adapted to tackle the OHSO problem by evaluating their performance in terms of convergence speed, achieved optimum solutions, and computing effort. Numerical experiments, performed on a test system composed by four cascaded hydro plants and an equivalent thermal plant, highlight the relevance of the adopted global search mechanisms, especially for LBBO and MVMO-SH. A nonlinear programming (NLP) algorithm is used as reference to validate the results.

Martha P. Camargo; Jos L. Rueda; Istvn Erlich; Osvaldo A

2014-01-01T23:59:59.000Z

449

A new operating strategy for economizer dampers of VAV system  

Science Journals Connector (OSTI)

The paper proposes a new operating strategy for the outdoor, discharge, and recirculation air dampers of the economizer in VAV system, called split-signal damper control strategy. The strategy controls the outdoor air by only one damper while keeping the remaining dampers full open. The discharge or recirculation air damper is modulated to control the amount of outdoor air introduced into the system while keeping the two remaining dampers full open. Since at least two dampers are always kept fully open during the occupied times, the strategy can provide a minimum static pressure drop in economizer dampers and results in minimum energy use in return and supply fans. An additional advantage is that the proposed strategy prevents reverse airflow through the discharge air damper of a VAV system that uses a volume matching control strategy. The proposed strategy along with the existing strategies such as the three-coupled dampers used in most existing system and the two-coupled dampers are evaluated on an existing system using 1-year long measured data set, along with an economizer damper model developed and validated in this paper. The simulation results show that the annual energy savings in supply and return fans of an existing system, compared to the traditional strategy of three-coupled dampers, are 12% and 5%, respectively.

N. Nassif; S. Moujaes

2008-01-01T23:59:59.000Z

450

Snap: Robust Tool for Internet-wide Operating System Fingerprinting  

E-Print Network [OSTI]

reduced. B. Our Contribution Over the past decade, many tools [3, 4, 5, 6, 7, 8, 9] have been developed to carry out operating system flngerprinting by analyzing the TCP/IP stack properties. These tools use difierent type and number of probes... the capability of identiflcation of unknown devices to Nmap. In 6 RTO1 RTO2 R-RTO1 Fig. 1. RTO (*Not sent by all OS). [14], Greenwald et al. discuss how information theoretic measures could be used to reduce the number of probes...

Nandwani, Ankur Bharatbhushan

2012-02-14T23:59:59.000Z

451

TENSOR PRODUCTS OF OPERATOR SYSTEMS ALI KAVRUK, VERN I. PAULSEN, IVAN G. TODOROV, AND MARK TOMFORDE  

E-Print Network [OSTI]

TENSOR PRODUCTS OF OPERATOR SYSTEMS ALI KAVRUK, VERN I. PAULSEN, IVAN G. TODOROV, AND MARK TOMFORDE Abstract. The purpose of the present paper is to study tensor prod- ucts of operator systems. After giving induced by a cer- tain canonical inclusion of an operator space into an operator system. We examine

452

OPERATOR SYSTEM STRUCTURES ON ORDERED VERN I. PAULSEN, IVAN G. TODOROV, AND MARK TOMFORDE  

E-Print Network [OSTI]

OPERATOR SYSTEM STRUCTURES ON ORDERED SPACES VERN I. PAULSEN, IVAN G. TODOROV, AND MARK TOMFORDE Abstract. Given an Archimedean order unit space (V, V + , e), we con- struct a minimal operator system OMIN(V ) and a maximal operator system OMAX(V ), which are the analogues of the minimal and max- imal operator spaces

453

1Centre for Autonomous Marine Operations and Systems -AMOSwww.ntnu.edu/amos 2Centre for Autonomous Marine Operations and Systems -AMOSwww.ntnu.edu/amos  

E-Print Network [OSTI]

· Propulsion control · Marine automation and power management · Marine operations · Control of marine1Centre for Autonomous Marine Operations and Systems - AMOSwww.ntnu.edu/amos AMOS Team 2013-2022 2013-05-27 #12;2Centre for Autonomous Marine Operations and Systems - AMOSwww.ntnu.edu/amos Jørgen

Nørvåg, Kjetil

454

Design and Implementation of Operation Energy Management System Based on AJAX-SSH2  

Science Journals Connector (OSTI)

With the development of communication network construction, the operation consumption of communications industry grows significantly in ... Therefore, it is necessary to develop an operation energy management system

Ye Yuan; Ke-Bin Jia

2014-01-01T23:59:59.000Z

455

(DOE/EIS-0285/SA-112): Supplement Analysis for the Transmission System Vegetation Management Program FEIS -Ross-Alcoa 1&2, 3&4 and Bonneville-Alcoa 1&2) 10/15/02  

Broader source: Energy.gov (indexed) [DOE]

October October 15, 2002 REPLY TO ATTN OF: KEP/Z-992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-112-Ross-Alcoa 1&2, 3&4 and Bonneville Alcoa 1&2. Ed Tompkins - TFO/Ross Proposed Action: Vegetation Management for portions of the Ross-Alcoa transmission lines 230kV & 115kV and Bonneville-Alcoa 115kV. Proposed by: Bonneville Power Administration (BPA). Location: Project location is within Clark County, Washington and is within the Olympia Region. Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of-Ways along access roads and around tower structures that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: See the attached checklists

456

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

457

Operational Strategies for Battery Storage Systems in Low-voltage Distribution Grids to Limit the Feed-in Power of Roof-mounted Solar Power Systems  

Science Journals Connector (OSTI)

Abstract Due to the high amount of installed solar power systems in Germany, the low-voltage distribution grids reach their maximum capacities in periods of high insolation. In order to ensure a proper integration of today's and especially the prospective solar energy, grid reinforcement is a common method to increase the transmission capacity. As an alternative to this costly and intricate approach, local battery storage systems can be used to store the surplus generation and limit the feed-in power of the solar power systems. In this paper, two different operational strategies for battery storage systems together with solar power systems for self-consumption are presented and evaluated. Results show that the feed-in power can be distinctly reduced without generating significant losses for the system-owner.

Alexander Zeh; Rolf Witzmann

2014-01-01T23:59:59.000Z

458

Operability test procedure [Tank] 241-SY-101 equipment removal system  

SciTech Connect (OSTI)

The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation.

Mast, J.C.

1994-12-08T23:59:59.000Z

459

Chapter 8 - Power-System Reliability Impact of Energy-Storage Integration with Intelligent-Operation Strategy  

Science Journals Connector (OSTI)

Abstract Electric power industry is experiencing a critical movement from the existing conventional electric grid to a more reliable, efficient and secure smart grid. In order to achieve these goals, components such as large scale energy storage will be included. Many feasible applications of energy storage in power systems have been investigated. The major benefits of energy storage include electric energy time-shift, frequency regulation and transmission congestion relief. In this chapter, the focus is on the reliability improvement of the bulk power system brought by the utilization of energy storage in the local distribution systems integrated with renewable energy generation. Operation strategies for flexible energy storage device are critical to the reliability and economic performance of the power system. An intelligent operation strategy for energy storage which improves reliability considering the renewable energy integration is presented. The framework of the smart grid communication and control network is utilized to implement the proposed energy storage operation. A bulk power system reliability evaluation framework is proposed to study the reliability impact brought by the energy storage integration and operation.

Yixing Xu

2015-01-01T23:59:59.000Z

460

(DOE/EIS-0285/SA-08): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/23/01  

Broader source: Energy.gov (indexed) [DOE]

23, 2001 23, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-08 Don Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Clearing C-trees along the south side of the right-of-way. Location: Raver - Covington Line 1, between towers 6/5 and 7/2. Work will be performed in the State of Washington. Proposed by: BPA Snohomish Region. Analysis: This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). Planning Steps 1. Identify facility and the vegetation management need. The project involves controlling all tall growing trees (C-Trees) within the right-of-way. All

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Optimal design and operation of energy systems under uncertainty  

Science Journals Connector (OSTI)

Abstract This paper is concerned with integrated design and operation of energy systems that are subject to significant uncertainties. The problem is cast as a two-stage stochastic programming problem, which can be transformed into a large-scale nonconvex mixed-integer nonlinear programming problem (MINLP). The MINLP exhibits a decomposable structure that can be exploited by nonconvex generalized Benders decomposition (NGBD) for efficient global optimization. This paper extends the NGBD method developed by the authors recently, such that the method can handle non-separable functions and integer operational decisions. Both the standard NGBD algorithm and an enhanced one with piecewise convex relaxations are discussed. The advantages of the proposed formulation and solution method are demonstrated through case studies of two industrial energy systems, a natural gas production network and a polygeneration plant. The first example shows that the two-stage stochastic programming formulation can result in better expected economic performance than the deterministic formulation, and that NGBD is more efficient than a state-of-the-art global optimization solver. The second example shows that the integration of piecewise convex relaxations can improve the efficiency of NGBD by at least an order of magnitude.

Xiang Li; Paul I. Barton

2014-01-01T23:59:59.000Z

462

Distributed web-based expert system for launch operations  

Science Journals Connector (OSTI)

The simulation and modeling of launch operations is based on a representation of the organization of the operations suitable to experiment of the physical, procedural, software, hardware and psychological aspects of space flight operations. The virtual ...

Jorge E. Bardina; Rajkumar Thirumalainambi

2005-12-01T23:59:59.000Z

463

Geothermal Progress Monitor: system status and operational experience  

SciTech Connect (OSTI)

The Geothermal Progress Monitor (GPM) is an information system designed and implemented by the MITRE Corporation on behalf of the Division of Geothermal and Hydropower Technology (DGHT, formerly Division of Geothermal Energy) of the US Department of Energy (DOE). Its purpose is to keep track of and to report significant events and trends in the US geothermal industry and the federal geothermal program. The information sources of the GPM system are paper and computerized files maintained by a number of organizations throughout the United States. Trade and technical publications are also used to supplement the information-gathering network. Periodic reports from the GPM system consist mainly of manual and computerized analyses of the collected data. In addition, significant events and activities are usually highlighted. The GPM serves a dual function for DGHT and other members of the Interagency Geothermal Coordinating Council (IGCC). It supports effective management of the federal geothermal program and it provides information for executive, legislative, statutory, and public needs. This paper is a report on the current status of the GPM system and a summary of MITRE's operational experience during calendar year 1981 and the first quarter of 1982. It includes a description of the required output and the mechanism by which the information is gathered, integrated, and published as a Geothermal Progress Monitor Report.

Gerstein, R.E.; Kenkeremath, L.D.; Murphy, M.B.; Entingh, D.J.

1982-03-01T23:59:59.000Z

464

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

465

Disco: Running Commodity Operating Systems on Scalable Multiprocessors Edouard Bugnion, Scott Devine, and Mendel Rosenblum  

E-Print Network [OSTI]

Disco: Running Commodity Operating Systems on Scalable Multiprocessors Edouard Bugnion, Scott operating system on a multiprocessor. Our experience shows that the overheads of the monitor are small of these systems. To reduce the memory overheads associated with running multiple operating systems, we have

Yang, Junfeng

466

Silberschatz, Galvin and Gagne 2009Operating System Concepts 8th Edition, Chapter 14: Protection  

E-Print Network [OSTI]

Silberschatz, Galvin and Gagne ©2009Operating System Concepts ­ 8th Edition, Chapter 14: Protection #12;14.2 Silberschatz, Galvin and Gagne ©2009Operating System Concepts ­ 8th Edition Objectives-based protection systems #12;14.3 Silberschatz, Galvin and Gagne ©2009Operating System Concepts ­ 8th Edition Goals

Flener, Pierre

467

CALL FOR PAPERS Stochastic Models of Manufacturing and Service System Operations  

E-Print Network [OSTI]

CALL FOR PAPERS Stochastic Models of Manufacturing and Service System Operations Special volume in the area of stochastic models of manufacturing and service system operations. A number of new results to the editors. The main theme of this volume is manufacturing system operations. The term "service system

468

Operation strategy for solid oxide fuel cell systems for small-scale stationary applications  

E-Print Network [OSTI]

or heat at the site where it is used. This concept reduces grid losses and focuses on demand rather than consumption by providing both heat and power on site without transmission losses. The high grade heat produced variation during the operation. The analysis will consider an average profile for heat and power demand

Berning, Torsten

469

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 16, NO. 4, NOVEMBER 2001 933 Discussion on "Review of Usage-Based Transmission Cost  

E-Print Network [OSTI]

of Usage-Based Transmission Cost Allocation Methods Under Open Access" Juan Zolezzi, Hugh Rudnick., IEEE Trans. Power Systems, vol. 15, no. 4, pp. 1218­1224, November 2000. Discussion of "Review of Usage comparing a variety of usage-based transmission charges. This discusser would like to make two points about

Catholic University of Chile (Universidad Católica de Chile)

470

IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS--II: EXPRESS BRIEFS, VOL. 55, NO. 9, SEPTEMBER 2008 927 Using Transmission Line Outage Data to  

E-Print Network [OSTI]

Using Transmission Line Outage Data to Estimate Cascading Failure Propagation in an Electric Power transmission line outages recorded over nine years in an electric power system with approx- imately 200 lines. The average amount of propagation of the line outages is estimated from the data. The distribution

Dobson, Ian

471

Coordination of Transmission Line Transfer Capabilities  

E-Print Network [OSTI]

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

472

(DOE/EIS-0285/SA-04): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 3/27/01  

Broader source: Energy.gov (indexed) [DOE]

March 27, 2001 March 27, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-04) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Ponderosa - Pilot Butte 18/2 to 18/4 Relocation Location: The project area is in the City of Bend, OR, in Deschutes County. Proposed by: Bonneville Power Administration Description of the Proposed Action: BPA proposes to clear unwanted vegetation from a section of BPA's Ponderosa - Pilot Butte Transmission Line Right-of-way to facilitate relocation of structure 18/3. Work would begin in mid-March and end in April, 2001. Analysis: 1. Description of right-of-way and vegetation management needed: The project involves

473

(DOE/EIS-0285/SA-52): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (03/22/02)  

Broader source: Energy.gov (indexed) [DOE]

22, 2002 22, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-52) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on the Ashe-Marion #2 (138/1-150/2), Buckley- Marion (12/1-24/2), McNary-Santiam (109/1-119/3), and John Day-Marion (49/4-50/5) Transmission Line Corridors. Location: The project area lies between Maupin and Pine Grove Oregon, and is in the Redmond Region. The project area begins at on the Ashe-Marion at structure 138/1 and terminates at Wapinitia Road, Pine Grove. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the

474

(DOE/EIS-0285/SA-15): Supplement Analysis for the Transmission System Vegetation Manaement Program FEIS 6/19/01  

Broader source: Energy.gov (indexed) [DOE]

United States Government Department of Energy Bonneville Power Administration DATE: June 19, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-15) Jim Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation management on selected sections of ROWs in the Ross-St. John and Ross-Carborundum transmission line ROWs. The ROWs include sections of the Ross-St. John 230Kv line; the Ross-Rivergate 230Kv line; the Ross-Alcoa 115Kv line; the Ross-Carborundum 115Kv line and the Clark PUD 115Kv line. Location: The ROWs span sections of Vancouver Washington and Portland Oregon and are all

475

(DOE/EIS-0285/SA-123): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/20/03  

Broader source: Energy.gov (indexed) [DOE]

20, 2003 20, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-123 Malin-Hilltop Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Malin-Hilltop (Structures 20/5-29/1). Location: The project area lies to the southeast of Klamath Falls, OR, and is located in Modoc County, California. Proposed by: Bonneville Power Administrationn (BPA) Description of the Proposed Action: Trees are located under and adjacent to conductors. Should a fire occur, these trees are a hazard to the line and could cause serious damage to the conductors, resulting in significant problems for the transmission grid. BPA plans on

476

SI-APRENDE: An Intelligent Learning System Based on SCORM Learning Objects for Training Power Systems Operators  

Science Journals Connector (OSTI)

This paper presents the architecture of the Intelligent Learning Systems for training of power systems operators and describes one of its components: the tutor module. Operators can acquire knowledge in differ...

Liliana Argotte; G. Arroyo-Figueroa

2011-01-01T23:59:59.000Z

477

Planning and processing of new or upgraded electric transmission systems in New Mexico  

SciTech Connect (OSTI)

RETA has been requested to identify and prioritize renewable energy resource zones in New Mexico that have a potential to support industry development among renewable energy developers for renewable resource generation projects. Moreover, Senate Memorial 44 requests that RETA identify and prioritize the best viable options for potential transmission corridors to accommodate renewable energy export from New Mexico in accordance with a defined time-line and to convene a working group to submit recommendations to the legislature for establishing a process to streamline procedures for establishing renewable energy transmission projects in New Mexico. RETA's July 9, 2009 request for comments outlined seven topical areas of specific value to Senate Memorial 44. This document addresses Topics 1, 3 and 4.

Toole, Gasper Loren [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

478

NREL: Energy Analysis: Transmission Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

479

Excavator tele-operation system using a human arm Dongmok Kim a  

E-Print Network [OSTI]

Excavator tele-operation system using a human arm Dongmok Kim a , Jongwon Kim a , Kyouhee Lee: Accepted 16 July 2008 Keywords: Tele-operation Excavator Orientation sensor Master/slave control system weight tele-operation system has been developed for the excavator for dealing with these problems. Three

Kim, Jongwon

480

Operator Systems: Quotients, Duals and Tensors with Applications to Connes' Embedding  

E-Print Network [OSTI]

Operator Systems: Quotients, Duals and Tensors with Applications to Connes' Embedding Conjecture and Mark Tomforde Banff, Alberta February, 2012 Vern Paulsen Operator Systems: Quotients, Duals and Tensors are the completely bounded maps. Vern Paulsen Operator Systems: Quotients, Duals and Tensors with Applicat #12

Argerami, Martin

Note: This page contains sample records for the topic "transmission system operator" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

NOAA Harmful Algal Bloom Operational Forecast System Southwest Florida Forecast Region Maps  

E-Print Network [OSTI]

Bloom Operational Forecast System Southwest Florida Forecast Region Maps 0 5 102.5 Miles #12;Bay Harmful Algal Bloom Operational Forecast System Southwest Florida Forecast Region Maps 0 5 102.5 Miles #12 N Collier N Charlotte S Charlotte NOAA Harmful Algal Bloom Operational Forecast System Southwest

482

A Framework for the Performance Evaluation of Operating System Emulators Joshua H. Shaffer  

E-Print Network [OSTI]

A Framework for the Performance Evaluation of Operating System Emulators by Joshua H. Shaffer modern operating systems are capable of seamlessly coexisting in heterogeneous computing environments of an operating system, such as network protocols and file formats. However, application binaries remain

Perrone, Luiz Felipe

483

Hey, You Got Your Language In My Operating System! Mark Montague  

E-Print Network [OSTI]

Hey, You Got Your Language In My Operating System! Jon Howell Mark Montague Technical Report PCS,montague}@cs.dartmouth.edu December 9, 1998 Abstract Several projects in the operating systems research community suggest a trend of convergence among fea- tures once divided between operating systems and languages. We describe how partial

484

The Nachos Instructional Operating System Wayne A. Christopher, Steven J. Procter, and Thomas E. Anderson  

E-Print Network [OSTI]

The Nachos Instructional Operating System Wayne A. Christopher, Steven J. Procter, and Thomas E operating systems at an undergraduate level, it is very important to provide a project that is realistic enough to show how real operating systems work, yet simple enough that the students can understand

Anderson, Tom

485

1.1 Silberschatz, Galvin and Gagne 2009Operating System Concepts 8th Edition OS Structures  

E-Print Network [OSTI]

1.1 Silberschatz, Galvin and Gagne ©2009Operating System Concepts ­ 8th Edition Lecture 2: OS Structures (Chapter 2.7) #12;1.2 Silberschatz, Galvin and Gagne ©2009Operating System Concepts ­ 8th Edition Operating System Design and Implementation Start by defining goals and specifications Affected by choice

Iamnitchi, Adriana

486

Optimal Operation Scheme for a Cogeneration System Promoted from an Emergency Standby System Combined with Absorption Chiller  

Science Journals Connector (OSTI)

A novel optimal operation scheme for a cogeneration system that is promoted from an emergency standby system combined with absorption chiller is introduced. The fuel cost, Time-of-use (TOU) tariff and various operational constrains are taken into account ... Keywords: cogeneration system, Time-of-use tariff, optimal operation scheme

Shyi-Wen Wang

2010-12-01T23:59:59.000Z

487

Systems acceptance and operability testing for rotary mode core sampling in flammable gas tanks  

SciTech Connect (OSTI)

This document provides instructions for the system acceptance and operability testing of the rotary mode core sampling system, modified for use in flammable gas tanks.

Corbett, J.E., Westinghouse Hanford

1996-07-29T23:59:59.000Z

488

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Broader source: Energy.gov (indexed) [DOE]

7: Champlain Hudson Power Express Transmission Line Project, 7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City. Public Comment Opportunities None available at this time. Documents Available for Download December 6, 2013 EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York

489

EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer,  

Broader source: Energy.gov (indexed) [DOE]

8: Antelope Valley Station to Neset Transmission Project, 8: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND SUMMARY USDA Rural Utilities Service is preparing this EIS to evaluate the environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE's Western Area Power Administration (WAPA), a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to Western's transmission system. PUBLIC COMMENT OPPORTUNITIES No Public Comment Opportunities at this time

490

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Broader source: Energy.gov (indexed) [DOE]

Statement - Appendices Statement - Appendices DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement DOE/EIS-0285 APPENDICES May 2000 Table of Contents Appendix A - Public Involvement: Publications Appendix B - Biological Weed Control Agents Appendix C - Bonneville Pesticide Applicator Certification Plan Appendix D - Sample Educational Information Appendix E - Clearance Criteria Appendix F - FS Mitigation Measures and Background Appendix G - BLM Mitigation Measures and Background Appendix H - Herbicide Fact Sheets 2,4-D Azafenidin Bromacil Chlorsulfuron Clopyralid Dicamba Dichlobenil Diuron Fosamine Ammonium Glyphosate Halosulfuron-methyl Hexazinone Imazapyr Isoxaben Mefluidide Metsulfuron-methyl

491

Studying Fischer-Tropsch catalysts using transmission electron microscopy and model systems of nanoparticles on planar supports.  

SciTech Connect (OSTI)

Nanoparticle model systems on planar supports form a versatile platform for studying morphological and compositional changes of catalysts due to exposure to realistic reaction conditions. We review examples from our work on iron and cobalt catalysts, which can undergo significant rearrangement in the reactive environment of the Fischer-Tropsch synthesis. The use of specially designed, silicon based supports with thin film SiO{sub 2} enables the application of transmission electron microscopy, which has furnished important insight into e.g. the mechanisms of catalyst regeneration.

Thune, P. C.; Weststrate, C. J.; Moodley, P.; Saib, A. M.; van de Loosdrecht, J.; Miller, J. T.; Niemantsverdriet, J. W. (Chemical Sciences and Engineering Division); (Eindhoven Univ. of Technology); (Sasol Technology)

2011-01-01T23:59:59.000Z

492

Issues arising with the application of optical fiber transmission in class 1E systems in nuclear power plants  

SciTech Connect (OSTI)

The application of fiber optic links and networks in safety-critical systems in the next generation of nuclear power plants, as well as in some digital upgrades in present-day plants, will mean that these links must be highly reliable and able to withstand the effect of environmental stressors present at the installation location. This paper discusses the failure modes and age-related mechanisms of fiber optic transmission components and identifies environmental stressors that could adversely affect their reliability over the long term. Some of the standards that could be used in their qualification for safety-critical applications are also discussed briefly.

Korsah, K. [Oak Ridge National Lab., TN (United States); Antonescu, C. [Nuclear Regulatory Commission, Washington, DC (United States). Office of Nuclear Regulatory Research

1993-12-31T23:59:59.000Z

493

RAPID/BulkTransmission/About | Open Energy Information  

Open Energy Info (EERE)

Contribute Contact Us About Bulk Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry...

494