Powered by Deep Web Technologies
Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

2010 Transmission Reliability Program Peer Review | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement Awardflash2007-42attachment1.pdfmodule 4Department0 Quality AssuranceTransmission

2

2014 Transmission Reliability Program Peer Review | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3 Beryllium-Associated Worker2014 House NuclearDepartment ofSoftTransmission

3

Human Reliability Program Overview  

SciTech Connect (OSTI)

This presentation covers the high points of the Human Reliability Program, including certification/decertification, critical positions, due process, organizational structure, program components, personnel security, an overview of the US DOE reliability program, retirees and academia, and security program integration.

Bodin, Michael

2012-09-25T23:59:59.000Z

4

Transmission Reliability "Load as a Resource" Peer Review Materials...  

Broader source: Energy.gov (indexed) [DOE]

Transmission Reliability "Load as a Resource" Peer Review Materials Now Available Transmission Reliability "Load as a Resource" Peer Review Materials Now Available September 25,...

5

Human Reliability Program Workshop  

SciTech Connect (OSTI)

A Human Reliability Program (HRP) is designed to protect national security as well as worker and public safety by continuously evaluating the reliability of those who have access to sensitive materials, facilities, and programs. Some elements of a site HRP include systematic (1) supervisory reviews, (2) medical and psychological assessments, (3) management evaluations, (4) personnel security reviews, and (4) training of HRP staff and critical positions. Over the years of implementing an HRP, the Department of Energy (DOE) has faced various challenges and overcome obstacles. During this 4-day activity, participants will examine programs that mitigate threats to nuclear security and the insider threat to include HRP, Nuclear Security Culture (NSC) Enhancement, and Employee Assistance Programs. The focus will be to develop an understanding of the need for a systematic HRP and to discuss challenges and best practices associated with mitigating the insider threat.

Landers, John; Rogers, Erin; Gerke, Gretchen

2014-05-18T23:59:59.000Z

6

Joint transmission system projects to improve system reliability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

County PUD, 425-783-8444 Joint transmission system projects to improve system reliability First major regional electric grid improvements in decades prepare the area for the...

7

Electricity Delivery and Energy Reliability PROGRAM DESCRIPTION  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

32 Electricity Delivery and Energy Reliability PROGRAM DESCRIPTION The Office of Electricity Delivery and Energy Reliability (OE) leads national efforts to modernize the electric...

8

The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations  

SciTech Connect (OSTI)

Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

Kirby, Brendan J [ORNL

2006-07-01T23:59:59.000Z

9

Customer Service Reliability Program Specialist  

Broader source: Energy.gov [DOE]

This position is located in Transmission Services Planning and Asset Management, in the Customer Service Engineering (TPC) organization. A successful candidate in this position will be a...

10

Reliability modeling and evaluation of HVDC power transmission systems  

SciTech Connect (OSTI)

The objective of this paper is to present an improved computational method for evaluating the reliability indices of HVdc transmission systems. The developed models and computational techniques are described. These can be used to simulate the operational practices and characteristics of a system under study efficiently and realistically. This method is based on the failure modes and effects analysis and uses the event tree method and the minimal cut set approach to represent the system's operational behavior and deduce the appropriate system's failure modes. A set of five reliability indices is evaluated for each output node being analyzed together with the probability and frequency of encountering particular regions of system performance levels. The analysis of an assumed HVdc bipolar transmission system is also included.

Dialynas, E.N.; Koskolos, N.C. (National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering)

1994-04-01T23:59:59.000Z

11

TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM  

E-Print Network [OSTI]

RFC: 793 TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM PROTOCOL SPECIFICATION September 1981 Admiralty Way Marina del Rey, California 90291 #12;#12;September 1981 Transmission Control Protocol TABLE ........................................... 12 2.9 Precedence and Security ...................................... 13 2.10 Robustness Principle

McBrien, Peter

12

Combining LT codes and XOR network coding for reliable and energy efficient transmissions in  

E-Print Network [OSTI]

Combining LT codes and XOR network coding for reliable and energy efficient transmissions projects. Recent technologies offer low-cost and low-power chips that can be deployed for monitoring reliability at the price of an increase in energy expenditure for redundant transmissions. Thus

Jaffrès-Runser, Katia

13

Reliable Packet Transmissions in Multipath Routed Wireless Networks  

E-Print Network [OSTI]

loss (PPL) in wireless networks. Path diversification uses erasure codes and multiple paths. We show that for low PPL, blind load balancing outperforms single-path transmission. In the second how to distribute the fragments for minimized PPL, and maximized efficiency given a bound on PPL. We

Valaee, Shahrokh

14

The Economic Value of Improving the Reliability of Supply on a Bulk Power Transmission Network  

E-Print Network [OSTI]

The Economic Value of Improving the Reliability of Supply on a Bulk Power Transmission Network Economics and Management and School of Electrical and Computer Engineering Cornell University Abstract, there is no established way of measuring the economic value of reliability, and as a result, regulators have adopted

15

Comparison of reliability performance of group connected and conventional HVDC transmission systems  

SciTech Connect (OSTI)

A group connected HVDC transmission scheme is a variant of the unit connection where instead of a single generator, a group of generators are directly connected to the converter. Studies conducted in the past indicated that significant cost reduction can be achieved using this scheme. This is mainly due to the elimination of many components which results in considerable capital and operating cost savings to the utility. Concerns regarding the reliability performance of unit connected schemes were raised, however, there has not been a detailed reliability study conducted. This paper addresses the reliability evaluation aspect of a group connected scheme and compares the reliability performance of the group connected scheme with that of the conventional common collector system. Reliability models for both schemes were developed using a hypothetical system model based on the Nelson River system. Practical system component outage data was used to examine the reliability performance of both schemes.

Kuruganty, S. [Univ. of North Dakota, Grand Forks, ND (United States). Dept. of Electrical Engineering] [Univ. of North Dakota, Grand Forks, ND (United States). Dept. of Electrical Engineering

1995-10-01T23:59:59.000Z

16

Web Cube: a Programming Model for Reliable Web Applications  

E-Print Network [OSTI]

Web Cube: a Programming Model for Reliable Web Applications I.S.W.B. Prasetya, T.E.J. Vos, S UU-CS-2005-002 www.cs.uu.nl #12;Web Cube: a Programming Model for Reliable Web Applications I@cs.uu.nl, tanja@iti.upv.es, doaitse@cs.uu.nl, bela@cs.ui.ac.id Abstract Web Cube is a server side programming

Utrecht, Universiteit

17

Sandia National Laboratories: Inverter Reliability Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLS Exhibit atVehicleEnergyPolydotsMicroReliabilityReliability

18

Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.  

SciTech Connect (OSTI)

The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

19

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

SciTech Connect (OSTI)

California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

2008-07-01T23:59:59.000Z

20

Sandia National Laboratories: Inverter Reliability Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Generator Modeling Radar Friendly Blades Special Programs Techno-Economic Modeling, Analysis, and Support Analysis, Modeling, Cost of Energy, and Policy Impact: Wind Vision 2014...

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

RELIABLE SOLUTION OF CONVEX QUADRATIC PROGRAMS ...  

E-Print Network [OSTI]

Table 1.1. Software for convex Quadratic Programming (in alphabetical order). 1.3. Existing software. ... Programming (PQP) method [3] in §2 and identify its fundamental numerical chal- lenges in §3. ... set W we assume matrix CW to have full rank and matrix B to be positive definite ..... This phenomenon is called drift.

2011-01-28T23:59:59.000Z

22

Sandia National Laboratories: Inverter Reliability Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLS Exhibit atVehicleEnergyPolydotsMicroReliability

23

Electric Utility Transmission and Distribution Line Engineering Program  

SciTech Connect (OSTI)

Economic development in the United States depends on a reliable and affordable power supply. The nation will need well educated engineers to design a modern, safe, secure, and reliable power grid for our future needs. An anticipated shortage of qualified engineers has caused considerable concern in many professional circles, and various steps are being taken nationwide to alleviate the potential shortage and ensure the North American power system's reliability, and our world-wide economic competitiveness. To help provide a well-educated and trained workforce which can sustain and modernize the nation's power grid, Gonzaga University's School of Engineering and Applied Science has established a five-course (15-credit hour) Certificate Program in Transmission and Distribution (T&D) Engineering. The program has been specifically designed to provide working utility engineering professionals with on-line access to advanced engineering courses which cover modern design practice with an industry-focused theoretical foundation. A total of twelve courses have been developed to-date and students may select any five in their area of interest for the T&D Certificate. As each course is developed and taught by a team of experienced engineers (from public and private utilities, consultants, and industry suppliers), students are provided a unique opportunity to interact directly with different industry experts over the eight weeks of each course. Course material incorporates advanced aspects of civil, electrical, and mechanical engineering disciplines that apply to power system design and are appropriate for graduate engineers. As such, target students for the certificate program include: (1) recent graduates with a Bachelor of Science Degree in an engineering field (civil, mechanical, electrical, etc.); (2) senior engineers moving from other fields to the utility industry (i.e. paper industry to utility engineering or project management positions); and (3) regular working professionals wishing to update their skills or increase their knowledge of utility engineering design practices and procedures. By providing graduate educational opportunities for the above groups, the T&D Program will help serve a strong industry need for training the next generation of engineers in the cost-effective design, construction, operation, and maintenance of modern electrical transmission and distribution systems. In addition to developing the on-line engineering courses described above, the T&D Program also focused significant efforts towards enhancing the training opportunities available to power system operators in the northwest. These efforts have included working with outside vendors to provide NERC-approved training courses in Gonzaga University's (GU) system operator training facility, support for an accurate system model which can be used in regional blackstart exercises, and the identification of a retired system operator who could provide actual regional training courses. The GU system operator training facility is also being used to recruit young workers, veterans, and various under-represented groups to the utility industry. Over the past three years students from Columbia Gorge Community College, Spokane Falls Community College, Walla Walla Community College, Central Washington University, Eastern Washington University, Gonzaga University, and various local high schools have attended short (one-day) system operator training courses free of charge. These collaboration efforts has been extremely well received by both students and industry, and meet T&D Program objectives of strengthening the power industry workforce while bridging the knowledge base across power worker categories, and recruiting new workers to replace a predominantly retirement age workforce. In the past three years the T&D Program has provided over 170 utility engineers with access to advanced engineering courses, been involved in training more than 300 power system operators, and provided well over 500 college and high school students with an experienc

Peter McKenny

2010-08-31T23:59:59.000Z

24

Reliability Improvement Programs in Steam Distribution and Power Generation Systems  

E-Print Network [OSTI]

improvements in the reliability and efficiency of the system. Recent studies have shown that more than 40% of all in stalled steam traps and 20% of certain types of valves n~ed ' some form of corrective action. The majority of all high backpressure... problems in condensate return systems are due to poor design criteria in expanding or retrofitting existing return systems. By instituting a maintenance management program,a 95% reliability can be gained with two to four annual maintenance cyc...

Atlas, R. D.

25

Reliability Improvement Programs in Steam Distribution and Power Generation Systems  

E-Print Network [OSTI]

RELIABILITY IIIPROVEfWlT PROGRAMS IN STEAM DISTRIBUTION AND POVER GENERATION SYSTEItS Steve Petto Tech/Serv Corporation Blue Bell, PA Abstract This paper will present alternatives to costly corrective maintenance of the steam trap... In the reliability and efficiency of the system. Recent studies have shownt hat more than 40% of all In stalled steam traps and 20% of certain types of valves need some form of corrective action. The majority of all high backpressure problems In condensate return...

Petto, S.

26

2012 CERTS Transmission Reliability R&D Internal Program Review...  

Broader source: Energy.gov (indexed) [DOE]

and Task Team Technical Support, Joe Gracia, ORNL 3:30 - 3:50: NASPI ESG and ARRA RFP support, Joe Eto, LBNL 3:50 - 4:10: BREAK SESSION V: NASPI Transition Planning...

27

2013 Transmission Reliability Program Peer Review | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3 Beryllium-Associated Worker Registry Summary 2013Evaluation3 NCSAM2013

28

2013 Transmission Reliability Program Peer Review - Day 1 Presentations |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment( SampleEnergyofDepartment ofLabor2013Department of Energy 1

29

2013 Transmission Reliability Program Peer Review - Day 2 Presentations |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment( SampleEnergyofDepartment ofLabor2013Department of Energy

30

2014 Transmission Reliability Program Peer Review - Day 1 Presentations |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment(October-December 2013 issue ofOfficeEnergy Two2014

31

2014 Transmission Reliability Program Peer Review - Day 2 Presentations |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment(October-December 2013 issue ofOfficeEnergy Two2014Department of

32

Achieving High Reliability Operations Through Multi-Program Integration  

SciTech Connect (OSTI)

Over the last 20 years the Idaho National Laboratory (INL) has adopted a number of operations and safety-related programs which has each periodically taken its turn in the limelight. As new programs have come along there has been natural competition for resources, focus and commitment. In the last few years, the INL has made real progress in integrating all these programs and are starting to realize important synergies. Contributing to this integration are both collaborative individuals and an emerging shared vision and goal of the INL fully maturing in its high reliability operations. This goal is so powerful because the concept of high reliability operations (and the resulting organizations) is a masterful amalgam and orchestrator of the best of all the participating programs (i.e. conduct of operations, behavior based safety, human performance, voluntary protection, quality assurance, and integrated safety management). This paper is a brief recounting of the lessons learned, thus far, at the INL in bringing previously competing programs into harmony under the goal (umbrella) of seeking to perform regularly as a high reliability organization. In addition to a brief diagram-illustrated historical review, the authors will share the INL’s primary successes (things already effectively stopped or started) and the gaps yet to be bridged.

Holly M. Ashley; Ronald K. Farris; Robert E. Richards

2009-04-01T23:59:59.000Z

33

DOE Human Reliability Program Removals Report 2004-2006  

SciTech Connect (OSTI)

This report presents results of the comprehensive data analysis and assessment of all U.S. Department of Energy (DOE) and National Nuclear Security Administration (NNSA) facilities that have positions requiring workers to be certified in the Human Reliability Program (HRP). Those facilities include: Albuquerque, Amarillo, DOE Headquarters, Hanford, Idaho, Nevada, Oak Ridge, Oakland, and Savannah River. The HRP was established to ensure, through continuous review and evaluation, the reliability of individuals who have access to the DOE’s most sensitive facilities, materials, and information.

Center for Human Reliability Studies

2007-02-01T23:59:59.000Z

34

A reliability cost-benefit analysis for HVDC transmission expansion planning  

SciTech Connect (OSTI)

A major portion of Manitoba Hydro's generation is located in the North on the Nelson River. The lower Nelson River generation is brought into the load centre in Southern Manitoba through an HVDC transmission system consisting of two bipoles, the first rated at 1680 MW at the rectifier and the second at 2000 MW. This paper presents the methodology used in arriving at the optimum Bipole 3 size using a reliability cost-benefit analysis. The analysis considers the forced outages of the generation and transmission systems using system outage statistics. The generator and valve group maintenance and the reduction in capability of thyristor valve groups during the summer season were also incorporated in the analysis. The load model used in the study was based on system data for the period 1980-1984. The criterion used in choosing the Bipole 3 size is to optimize the present worth value of the annual energy curtailment due to the HVDC system forced outages and the incremental installation cost of the transmission as the capacity of Bipole 3 is increased. The optimum Bipole 3 size based on the study is 2200 MW. This value is significantly lower than that based on a pole spare criterion used in the earlier development of the HVDC system. Finally, the need for validation of the outage data in evaluating future HVDC projects and the need for data collection and classification is indicated.

Kuruganty, P.R.S. (Manitoba Hydro, Winnipeg, Manitoba (CA)); Woodford, D.A. (Manitoba HVDC Research Centre, Winnipeg, Manitoba (CA))

1988-07-01T23:59:59.000Z

35

Case study on the US superconducting power transmission program  

SciTech Connect (OSTI)

After the 1911 discovery of superconductivity (the abrupt loss of electrical resistance in certain materials at very low temperatures), attempts were made to make practical use of this phenomenon. Initially these attempts failed, but in the early 1960s (after 50 years of research) they succeeded. By then, the projected growth in the production and consumption of electrical energy required much higher capacity power transmission capabilities than were available or likely to become available from incremental improvements in existing transmission technology. Since superconductors were capable in principle of transmitting huge amounts of power, research programs to develop and demonstrate superconducting transmission lines were initiated in the US and abroad. The history of the US program, including the participants, their objectives, funding and progress made, is outlined. Since the R&D program was terminated before the technology was completely demonstrated, the reasons for and consequences of this action are discussed in a final section.

Hammel, E.F.

1996-02-01T23:59:59.000Z

36

Probabilistic Approach to Quantifying the Contribution of Variable Generation and Transmission to System Reliability: Preprint  

SciTech Connect (OSTI)

The increasing electrical load served by variable generation (VG), such as wind and solar energy, in the United States and many other countries has stimulated an interesting line of research to better quantify the capacity value of these resources. Methods applied traditionally to thermal units based on their average outage rates do not apply to VG because of their uncertain and non-dispatchable nature. The North American Electric Reliability Corporation's Integration of Variable Generation Task Force recently released a report that highlighted the need to develop and benchmark underlying loss-of-load expectation and related metrics that reasonably and fairly calculate the contribution to planning reserves, or capacity value, of solar and wind power. As the fraction of generation coming from VG becomes more significant, their estimated capacity value will have a larger impact on system planning. In this paper, we provide a method to include VG in traditional probabilistic-based adequacy methods. This method has been implemented in the Renewable Energy Probabilistic Resource Assessment tool developed at the National Renewable Energy Laboratory. Through an example based on the U.S. Western Interconnection, this method is applied to assess the effect that transmission can have on resource adequacy. We also analyze the interactions between available transmission and capacity value for VG.

Ibanez, E.; Milligan, M.

2012-09-01T23:59:59.000Z

37

Reliability and Markets Program Information | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 |RebeccaRegionalReliability and Markets Program Information

38

Transmission Matters Now: How Will Power Market Regulations Impact the Industrial's Power Supply Costs and Reliability?  

E-Print Network [OSTI]

The standardization of the power market structure and transmission access rules will result in new rules for dealing with the transmission systems. Furthermore, transmission system limitations and market inadequacies will have a significant impact...

James, F.; Beidas, H.; Fox, R.

39

Maximizing Energy Savings Reliability in BC Hydro Industrial Demand-side Management Programs  

E-Print Network [OSTI]

Maximizing Energy Savings Reliability in BC Hydro Industrial Demand-side Management Programs Supervisory Committee Maximizing Energy Savings Reliability in BC Hydro Industrial Demand-side Management of Environmental Studies) Departmental Member For energy utilities faced with expanded jurisdictional energy

Victoria, University of

40

Development of a Successful Program in Reliability and Maintainability Engineering  

E-Print Network [OSTI]

and Maintainability Center The Maintenance and Reliability Center is a university - industry association dedicated at UT · Reliability and Maintainability Center (RMC) ­ University - industry association dedicated and reliability technologies and management principles ­ Industrial Center since 1996 with ~30 members

Bernstein, Joseph B.

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.  

SciTech Connect (OSTI)

Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

42

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-15)  

SciTech Connect (OSTI)

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines. Work also includes clearing of a small (<1/4 mile) section of access road. All work will be in accordance with the National Electrical Safety Code and BPA standards. See Section 1.1 of the attached checklist for detailed information on each section of the referenced transmission lines. BPA will conduct the vegetation control with the goal of removing tall-growing vegetation that is currently or will soon be a hazard to the transmission lines and where possible to promote low-growing plant communities in the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The vegetation needing control is mainly Douglas Fir, Alder, and blackberries as indicated in Section 1.2 of the attached checklist. The work involved in the ROW includes: clearing tall growing vegetation that is currently or will soon pose a hazard to the lines; treating the associated stumps and re-sprouts with herbicide to ensure that the roots are killed preventing new sprouts; and selectively eliminating tall growing vegetation before it reaches a height or density to begin competing with low-growing vegetation. All work will take place in existing rights-of-ways and around transmission structures. All work will be accomplished by selective vegetation control methods to assure that there is little potential harm to non-target vegetation and to low-growing plants. The work will provide system reliability and fire protection. Also, all off right-of-way trees that are potentially unstable and will fall within a minimum distance or into the zone where the conductors swing will be removed. Access roads will be treated using mowing and herbicide applications. The work will provide system reliability. The subject transmission lines range from 115kV to 230kV and are made up of accompanying access roads, steel and wooden transmission line structures and associated switching platforms. The minimum clearance ranges from 21 feet for 115kV lines to 23 feet for 230kV lines. ROW easement widths vary along the length of the project. Vegetation control for this project is designed to provide a 3 year maintenance free interval. In summary, the overall vegetation management scheme will be to selectively remove tall growing vegetation then apply selective herbicide treatment using cut stump applications.

N /A

2001-06-19T23:59:59.000Z

43

Reliable, Lightweight Transmissions For Off-Shore, Utility Scale Wind Turbines  

SciTech Connect (OSTI)

The objective of this project was to reduce the technical risk for a hydrostatic transmission based drivetrain for high-power utility-size wind turbines. A theoretical study has been performed to validate the reduction of cost of energy (CoE) for the wind turbine, identify risk mitigation strategies for the drive system and critical components, namely the pump, shaft connection and hydrostatic transmission (HST) controls and address additional benefits such as reduced deployment costs, improved torque density and improved mean time between repairs (MTBR).

Jean-Claude Ossyra

2012-10-25T23:59:59.000Z

44

Transmission System Expansion Plans in View Point of Deterministic, Probabilistic and Security Reliability Criteria  

E-Print Network [OSTI]

Transmission System Expansion Plans in View Point of Deterministic, Probabilistic and Security control system as well as reasonable strength of grid originally. Because investment for power system the stability, and dynamic characteristics of the new system. A main reason of the separated work process

45

Economic analysis of the N-1 reliable unit commitment and transmission switching problem using duality concepts  

E-Print Network [OSTI]

is a result due to using linear generator costs. Figure 4linear scarcity rent over the time horizon for generator g.linear program and ? gt can be interpreted as the marginal value of an increase in capacity and is called the generator

O’Neill, Richard P.; Hedman, Kory W.; Krall, Eric A.; Papavasiliou, Anthony; Oren, Shmuel S.

2010-01-01T23:59:59.000Z

46

Bringing you a prosperous future where energy is clean, abundant, reliable and affordable Industrial Technologies Program  

E-Print Network [OSTI]

Technologies Program A Strong Energy Portfolio for a Strong America Energy efficiency and clean, renewableBringing you a prosperous future where energy is clean, abundant, reliable and affordable Industrial Technologies Program U.S. Department of Energy Office of Energy Efficiency and Renewable Energy

Beckermann, Christoph

47

Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming  

SciTech Connect (OSTI)

This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6percent.

Cardoso, Goncalo; Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; DeForest, Nicholas; Barbosa-Povoa, Ana; Ferrao, Paulo

2013-05-23T23:59:59.000Z

48

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

49

Transmission  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for Transmission ,...

50

Bringing you a prosperous future where energy is clean, abundant, reliable and affordable Industrial Technologies Program  

E-Print Network [OSTI]

Bringing you a prosperous future where energy is clean, abundant, reliable and affordable Industrial Technologies Program U.S. Department of Energy Office of Energy Efficiency and Renewable Energy for a comprehensive, physics- based model of dimensional changes and hot tearing. Hot Tear #12;Industrial Technologies

Beckermann, Christoph

51

Fast, Cheap, and Under Control: Evaluating Revision Data Reliably Daghstuhl: Mining Programs and Processes Fast, Cheap and Under Control  

E-Print Network [OSTI]

release time Abram Hindle 5 #12;Fast, Cheap, and Under Control: Evaluating Revision Data ReliablyFast, Cheap, and Under Control: Evaluating Revision Data Reliably Daghstuhl: Mining Programs and Processes Fast, Cheap and Under Control: Evaluating Revision Data Reliably Abram Hindle, Michael W. Godfrey

Godfrey, Michael W.

52

Transmission and distribution technologies: Program overview, FY 1993--FY 1994  

SciTech Connect (OSTI)

Electricity is the lifeblood of our Nation`s economy and a critical contributor to our standard of living. For decades, increases in the gross domestic product (GDP) have been accompanied by increases in electricity use. This overview provides the reader with an introduction to the US Department of Energy`s (DOE`s) T&D Technologies Program. It shows how the program is meeting the challenges being imposed on the T&D infrastructure by the changing electric power industry and how the Nation will benefit from its efforts. The overview describes the program`s ongoing projects and discusses the new projects being initiated in fiscal year (FY) 1995.

NONE

1995-06-01T23:59:59.000Z

53

EIS-0097: Bonneville Power Administration Transmission Facilities Vegetation Management Program  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Bonneville Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with implementing a vegetation management program.

54

Human Reliability Program 10 CFR, part 712 Subpart B Medical Standards  

Broader source: Energy.gov [DOE]

HRP Policy is the responsibility of the Office of Departmental Personnel Security Policy (HS-1.4). The Office of Worker Safety and Health Assistance (HS-12), has responsibility within the DOE Human Reliability Programs (HRP) to ensure appropriate policies and procedures are in place and used at HQ and the DOE sites to monitor HRP-designated worker's health and fitness-for-duty.

55

Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Tutorial  

SciTech Connect (OSTI)

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) refers to a set of computer programs that were developed to create and analyze probabilistic risk assessment (PRAs). This volume is the tutorial manual for the SAPHIRE system. In this document, a series of lessons are provided that guide the user through basic steps common to most analyses preformed with SAPHIRE. The tutorial is divided into two major sections covering both basic and advanced features. The section covering basic topics contains lessons that lead the reader through development of a probabilistic hypothetical problem involving a vehicle accident, highlighting the program’s most fundamental features. The advanced features section contains additional lessons that expand on fundamental analysis features of SAPHIRE and provide insights into more complex analysis techniques. Together, these two elements provide an overview into the operation and capabilities of the SAPHIRE software.

C. L. Smith; S. T. Beck; S. T. Wood

2008-08-01T23:59:59.000Z

56

Did geomagnetic activity challenge electric power reliability during solar cycle 23? Evidence from the PJM regional transmission  

E-Print Network [OSTI]

Did geomagnetic activity challenge electric power reliability during solar cycle 23? Evidence from through 30 April 2004. During this time period PJM coordinated the movement of wholesale electricity of challenged reliability is the incidence of out-of-economic-merit order dispatching due to adverse reactive

Schrijver, Karel

57

New International Program to Asses the Reliability of Emerging Nondestructive Techniques (PARENT)  

SciTech Connect (OSTI)

The Nuclear Regulatory Commission (NRC) established the Program to Assess the Reliability of Emerging Nondestructive Techniques (PARENT) to follow on from the successful Program for the Inspection of Nickel alloy Components (PINC). The goal of the PARENT is to conduct a confirmatory assessment of the reliability of nondestructive evaluation (NDE) techniques for detecting and sizing primary water stress corrosion cracks (PWSCC) and applying the lessons learned from PINC to a series of round-robin tests. These open and blind round-robin tests will comprise a new set of typical pressure boundary components including dissimilar metal welds (DMWs) and bottom-mounted instrumentation penetrations. Open round-robin tests will engage research and industry teams worldwide to investigate and demonstrate the reliability of emerging NDE techniques to detect and size flaws with a wide range of lengths, depths, orientations, and locations. Blind round-robin tests will utilize various testing organizations, whose inspectors and procedures are certified by the standards for the nuclear industry in their respective countries, to investigate the ability of established NDE techniques to detect and size flaws whose characteristics range from relatively easy to very difficult for detection and sizing. Blind and open round-robin testing started in late 2011 and early 2012, respectively. This paper will present the work scope with reports on progress, NDE methods evaluated, and project timeline for PARENT.

Prokofiev, Iouri; Cumblidge, Stephen E.; Csontos, Aladar A.; Braatz, Brett G.; Doctor, Steven R.

2013-01-25T23:59:59.000Z

58

2012 CERTS Transmission Reliability R&D Internal Program Review - Agenda  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment( SampleEnergyof Environmental Management |FY12 DOE - CERTS

59

2012 CERTS Transmission Reliability R&D Internal Program Review - Participant List  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment( SampleEnergyof Environmental Management |FY12 DOE -

60

Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Quality Assurance Manual  

SciTech Connect (OSTI)

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment using a personal computer running the Microsoft Windows operating system. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC). The role of the INL in this project is that of software developer and tester. This development takes place using formal software development procedures and is subject to quality assurance (QA) processes. The purpose of this document is to describe how the SAPHIRE software QA is performed for Version 6 and 7, what constitutes its parts, and limitations of those processes.

C. L. Smith; R. Nims; K. J. Kvarfordt; C. Wharton

2008-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) GEM Manual  

SciTech Connect (OSTI)

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer running the Microsoft Windows? operating system. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory (INL). The INL's primary role in this project is that of software developer and tester. Using the SAPHIRE analysis engine and relational database is a complementary program called GEM. GEM has been designed to simplify using existing PRA analysis for activities such as the NRC’s Accident Sequence Precursor program. In this report, the theoretical framework behind GEM-type calculations are discussed in addition to providing guidance and examples for performing evaluations when using the GEM software. As part of this analysis framework, the two types of GEM analysis are outlined, specifically initiating event (where an initiator occurs) and condition (where a component is failed for some length of time) assessments.

C. L. Smith; J. Schroeder; S. T. Beck

2008-08-01T23:59:59.000Z

62

Field Operations Program Chevrolet S-10 (Lead-Acid) Accelerated Reliability Testing - Final Report  

SciTech Connect (OSTI)

This report summarizes the Accelerated Reliability testing of five lead-acid battery-equipped Chevrolet S-10 electric vehicles by the US Department of Energy's Field Operations Program and the Program's testing partners, Electric Transportation Applications (ETA) and Southern California Edison (SCE). ETA and SCE operated the S-10s with the goal of placing 25,000 miles on each vehicle within 1 year, providing an accelerated life-cycle analysis. The testing was performed according to established and published test procedures. The S-10s' average ranges were highest during summer months; changes in ambient temperature from night to day and from season-to-season impacted range by as much as 10 miles. Drivers also noted that excessive use of power during acceleration also had a dramatic effect on vehicle range. The spirited performance of the S-10s created a great temptation to inexperienced electric vehicle drivers to ''have a good time'' and to fully utilize the S-10's acceleration capability. The price of injudicious use of power is greatly reduced range and a long-term reduction in battery life. The range using full-power accelerations followed by rapid deceleration in city driving has been 20 miles or less.

J. Francfort (INEEL); J. Argueta; M. Wehrey (Southern California Edison); D. Karner; L. Tyree (Electric Transportation Applications)

1999-07-01T23:59:59.000Z

63

Human Reliability | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Human Reliability SHARE Human Reliability The Structured Trusted Employee Program (STEP) Evaluation is an example of a method for identifying, assessing, and retaining reliable and...

64

Transmission Reliability | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomenthe House Committee on EnergyEnergyThe sun risesThe U.S.ModernizingModernizing

65

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

66

Central Wind Power Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities  

SciTech Connect (OSTI)

The report addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America.

Porter, K.; Rogers, J.

2009-12-01T23:59:59.000Z

67

Systems Analysis Programs for Hands-on Intergrated Reliability Evaluations (SAPHIRE) Summary Manual  

SciTech Connect (OSTI)

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer (PC) running the Microsoft Windows operating system. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory (INL). INL's primary role in this project is that of software developer and tester. However, INL also plays an important role in technology transfer by interfacing and supporting SAPHIRE users, who constitute a wide range of PRA practitioners from the NRC, national laboratories, the private sector, and foreign countries. SAPHIRE can be used to model a complex system’s response to initiating events and quantify associated consequential outcome frequencies. Specifically, for nuclear power plant applications, SAPHIRE can identify important contributors to core damage (Level 1 PRA) and containment failure during a severe accident which lead to releases (Level 2 PRA). It can be used for a PRA where the reactor is at full power, low power, or at shutdown conditions. Furthermore, it can be used to analyze both internal and external initiating events and has special features for transforming an internal events model to a model for external events, such as flooding and fire analysis. It can also be used in a limited manner to quantify risk in terms of release consequences to the public and environment (Level 3 PRA). SAPHIRE also includes a separate module called the Graphical Evaluation Module (GEM). GEM is a special user interface linked to SAPHIRE that automates the SAPHIRE process steps for evaluating operational events at commercial nuclear power plants. Using GEM, an analyst can estimate the risk associated with operational events (for example, to calculate a conditional core damage probability) very efficiently and expeditiously. This report provides an overview of the functions available in SAPHIRE and presents general instructions for using the software. Section 1 presents SAPHIRE’s historical evolution and summarizes its capabilities. Section 2 presents instructions for installing and using the code. Section 3 explains the database structure used in SAPHIRE and discusses database concepts. Section 4 explains how PRA data (event frequencies, human error probabilities, etc.) can be generated and manipulated using “change sets.” Section 5 deals with fault tree operations, including constructing, editing, solving, and displaying results. Section 6 presents operations associated with event trees, including rule application for event tree linking, partitioning, and editing sequences. Section 7 presents how accident sequences are generated, solved, quantified, and analyzed. Section 8 discusses the functions available for performing end state analysis. Section 9 explains how to modify data stored in a SAPHIRE database. Section 10 illustrates how to generate and customize reports. Section 11 covers SAPHIRE utility options to perform routine functions such as defining constant values, recovering databases, and loading data from external sources. Section 12 provides an overview of GEM’s features and capabilities. Finally, Section 13 summarizes SAPHIRE’s quality assurance process.

C. L. Smith

2008-08-01T23:59:59.000Z

68

Central Wind Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities: Revised Edition  

SciTech Connect (OSTI)

The report and accompanying table addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America. The first part of the table focuses on electric utilities and regional transmission organizations that have central wind power forecasting in place; the second part focuses on electric utilities and regional transmission organizations that plan to adopt central wind power forecasting in 2010. This is an update of the December 2009 report, NREL/SR-550-46763.

Rogers, J.; Porter, K.

2011-03-01T23:59:59.000Z

69

Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New York)  

Broader source: Energy.gov [DOE]

Up to $10 million in funds is available from NYSERDA to support research and engineering studies, product development and demonstration projects that improve the reliability, efficiency, quality,...

70

2014 WIND POWER PROGRAM PEER REVIEW-RELIABILITY & A2E  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment(October-December 2013 issue ofOfficeEnergyAnalysisReliability

71

July 24, 2009, Visiting Speakers Program - Regulation and High Reliability Organizations by Dr. Jerry Ellig  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7January 2015JimJulieand High Reliability

72

Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management approach that fosters low-growing plant communities.

N /A

2000-06-23T23:59:59.000Z

73

Self-Reliability and Motivation in a Nuclear Security Culture Enhancement Program  

SciTech Connect (OSTI)

The threat of nuclear terrorism has become a global concern. Many countries continue to make efforts to strengthen nuclear security by enhancing systems of nuclear material protection, control, and accounting (MPC&A). Though MPC&A systems can significantly upgrade nuclear security, they do not eliminate the “human factor.” Gen. Eugene Habiger, a former “Assistant Secretary for Safeguards and Security” at the U.S. Department of Energy’s (DOE) nuclear-weapons complex and a former commander of U.S. strategic nuclear forces, has observed that “good security is 20% equipment and 80% people.”1 Although eliminating the “human factor” is not possible, accounting for and mitigating the risk of the insider threat is an essential element in establishing an effective nuclear security culture. This paper will consider the organizational role in mitigating the risk associated with the malicious insider through monitoring and enhancing human reliability and motivation as well as enhancing the nuclear security culture.

Crawford, Cary E.; de Boer, Gloria; De Castro, Kara; Landers, John; Rogers, Erin

2010-10-01T23:59:59.000Z

74

Copyright 2002 Chillarege Press FastAbstract ISSRE 2002 "Good Enough" Reliability for Extreme Programming  

E-Print Network [OSTI]

explicit estimation of the probability that the software system performs according to its requirements With Extreme Programming (XP) [1], customers incrementally write system requirements via short, natural-language statements called user stories. Ongoing customer involvement is necessary for clarification of user stories

Williams, Laurie

75

Medical Aspects of Reliability  

SciTech Connect (OSTI)

This presentation covers the medical evaluation as part of a human reliability program, particularly the various medical qualifications and potential disqualifiers.

Atencio, Julian J.

2014-05-05T23:59:59.000Z

76

Self-Reliability and Motivation in a Nuclear Security Culture Enhancement Program  

SciTech Connect (OSTI)

The threat of nuclear terrorism has become a global concern. Many countries continue to make efforts to strengthen nuclear security by enhancing systems of nuclear material protection, control, and accounting (MPC&A). Though MPC&A systems can significantly upgrade nuclear security, they do not eliminate the "human factor." This paper will describe some of the key elements of a comprehensive, sustainable nuclear security culture enhancement program and how implementation can mitigate the insider threat.

Crawford,C.; de Boer,G.; De Castro, K; Landers, Ph.D., J; Rogers, E

2009-10-19T23:59:59.000Z

77

Sandia National Laboratories: Continuous Reliability Enhancement...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

StandardsContinuous Reliability Enhancement for Wind (CREW) Database and Analysis Program Continuous Reliability Enhancement for Wind (CREW) Database and Analysis Program 2013 CREW...

78

Data Communication Principles Reliable Data Transfer  

E-Print Network [OSTI]

Principles Switching Reliable Data Transfer Data Rate of a Communication Channel Transmission Media Data Principles Switching Reliable Data Transfer Data Rate of a Communication Channel Transmission Media Data Transmission Fiber vs Copper Wire Weight vs bandwidth Cost Security 11 / 52 #12;Data Communication Principles

Ramkumar, Mahalingam

79

A case study review of technical and technology issues for transition of a utility load management program to provide system reliability resources in restructured electricity markets  

SciTech Connect (OSTI)

Utility load management programs--including direct load control and interruptible load programs--were employed by utilities in the past as system reliability resources. With electricity industry restructuring, the context for these programs has changed; the market that was once controlled by vertically integrated utilities has become competitive, raising the question: can existing load management programs be modified so that they can effectively participate in competitive energy markets? In the short run, modified and/or improved operation of load management programs may be the most effective form of demand-side response available to the electricity system today. However, in light of recent technological advances in metering, communication, and load control, utility load management programs must be carefully reviewed in order to determine appropriate investments to support this transition. This report investigates the feasibility of and options for modifying an existing utility load management system so that it might provide reliability services (i.e. ancillary services) in the competitive markets that have resulted from electricity industry restructuring. The report is a case study of Southern California Edison's (SCE) load management programs. SCE was chosen because it operates one of the largest load management programs in the country and it operates them within a competitive wholesale electricity market. The report describes a wide range of existing and soon-to-be-available communication, control, and metering technologies that could be used to facilitate the evolution of SCE's load management programs and systems to provision of reliability services. The fundamental finding of this report is that, with modifications, SCE's load management infrastructure could be transitioned to provide critical ancillary services in competitive electricity markets, employing currently or soon-to-be available load control technologies.

Weller, G.H.

2001-07-15T23:59:59.000Z

80

Hawaii electric system reliability.  

SciTech Connect (OSTI)

This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

Silva Monroy, Cesar Augusto; Loose, Verne William

2012-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Reliability assessment of autonomous power systems incorporating HVDC interconnection links  

SciTech Connect (OSTI)

The objective of this paper is to present an improved computational method for the overall reliability assessment of autonomous power systems that may or may not contain HVdc interconnection links. This is a hybrid method based on a Monte-Carlo simulation sequential approach which incorporates an analytical approach for the reliability modeling of the HVdc transmission links. The developed models and techniques have been implemented into a computer program that can be used to simulate the operational practices and characteristics of the overall system under study efficiently and realistically. A set of reliability indices are calculated for each load-point of interest and the entire system while a set of additional indices is calculated for quantifying the reliability performance of the interconnection links under the specified operating requirements. The analysis of a practical system is also included for a number of studies representing its various operating and design characteristics.

Dialynas, E.N.; Koskolos, N.C. [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering] [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering; Agoris, D. [Public Power Corp., Athens (Greece)] [Public Power Corp., Athens (Greece)

1996-01-01T23:59:59.000Z

82

Office of Electricity Delivery and Energy Reliability Recovery...  

Broader source: Energy.gov (indexed) [DOE]

Electricity Delivery and Energy Reliability Recovery Program Plan Office of Electricity Delivery and Energy Reliability Recovery Program Plan Microsoft Word - OE PSRP June 5 2009...

83

APIC'95, El Paso, Extended Abstracts, A Supplement to the international journal of Reliable Computing 1 Functional Programming and Interval  

E-Print Network [OSTI]

increases. Nowadays, software already controls nuclear plants, weapons, etc. Human lives, and even to guarantee reliability is to test a pro­ gram for all possible cases. Usually, there are many possible inputs, so testing all of them is always dif­ ficult, and most of the time practically impossible. If we test

Kreinovich, Vladik

84

Bulk Power Transmission Study  

E-Print Network [OSTI]

BULK POWER TRANSMISSION STUDY TOMMY JOH~ P. E. Manager of Resource Recovery Waste Management of North America, Inc. Houston, Texas Texans now have a choice. We can become more efficient and maintain our standard of living, or we can... continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled...

John, T.

85

SunZia Southwest Transmission Project Comments  

Energy Savers [EERE]

Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

86

2012 National Electric Transmission Congestion Study: Preliminary...  

Broader source: Energy.gov (indexed) [DOE]

Meyer Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 2012 National Electric Transmission Congestion Study Preliminary Findings Stakeholder...

87

July 24, 2009, Visiting Speakers Program - The Next Generation of Regulation for High-Reliability Organizations by HON. John Bresland  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7January 2015JimJulieand High ReliabilityNext

88

Clean, Efficient, and Reliable Heat and Power for the 21st Century, Fuel Cell Technologies Program (FCTP) (Fact Sheet)  

SciTech Connect (OSTI)

This overview of the U.S. Department of Energy's Fuel Cell Technologies Program describes the program's focus and goals, along with current fuel cell applications and future potential. The program focuses on research and development of fuel cell systems for diverse applications in the stationary power, portable power, and transportation sectors. It works to reduce costs and improve technologies to advance fuel cell uses in areas such as combined heat and power, auxiliary power units, portable power systems, and stationary and backup power. To help ensure that fuel cell advances are realized, the program rigorously analyzes energy efficiency, economic, and environmental benefits of fuel cells and seeks to optimize synergies among fuel cell applications and other renewable technologies.

Not Available

2010-05-01T23:59:59.000Z

89

Planning electricity transmission to accommodate renewables: Using two-stage programming to evaluate flexibility and the cost of disregarding uncertainty  

E-Print Network [OSTI]

We develop a stochastic two-stage optimisation model that captures the multistage nature of electricity transmission planning under uncertainty and apply it to a stylised representation of the Great Britain (GB) network. In our model, a proactive...

van der Weijde, Adriaan Hendrik; Hobbs, Benjamin F.

2011-01-31T23:59:59.000Z

90

Electricity Reliability  

E-Print Network [OSTI]

Electricity Delivery and Energy Reliability High Temperature Superconductivity (HTS) Visualization in the future because they have virtually no resistance to electric current, offering the possibility of new electric power equipment with more energy efficiency and higher capacity than today's systems

91

Estimated Value of Service Reliability for Electric Utility Customers in the United States  

E-Print Network [OSTI]

reliability of their transmission and distribution systemsdistribution against the incremental benefits of enhanced (or maintained) system reliabilitysystem reliability reinforcements; Assessing the economic benefits of distribution

Sullivan, M.J.

2009-01-01T23:59:59.000Z

92

Accepted for publication in Reliability Engineering and System Safety Analyzing the topological, electrical and reliability  

E-Print Network [OSTI]

Accepted for publication in Reliability Engineering and System Safety Analyzing the topological, electrical and reliability characteristics of a power transmission system for identifying its critical of the system the reliability and electrical characteristics of its components. In each phase of the analysis: i

Paris-Sud XI, Université de

93

Articles about Grid Integration and Transmission  

Broader source: Energy.gov [DOE]

Stories about grid integration and transmission featured by the U.S. Department of Energy (DOE) Wind Program.

94

Bibliography on transmission access issues  

SciTech Connect (OSTI)

This paper presents a bibliography on issues related to transmission access in electric power systems. There are 233 citations referenced in this bibliography. This bibliography presents a collection of selected literature on issues related to transmission access. It does not contain all of the material available on this subject or the categories contained herein. Some readers may feel that citations within this bibliography should be strictly limited to transmission system issues and not include energy pricing or reliability issues. However, it was the decision of the Subcommittee of the IEEE Task Force on Transmission Access and Nonutility Generation that selected entries relating to reliability and energy pricing, most relevant to transmission access, should be included. This decision was made because certain issues relating to reliability, transmission and energy pricing are perceived by the industry to be critical in the discussion of transmission access. The bibliography has been divided into the following sections or sub-sections: 2.0 Operational (Engineering) Issues, 3.0 Planning, 4.0 Reliability, 5.1 Economics: Costing, 5.2(a) Economics: Location-Differentiated Pricing, 5.2(b) Economics: Time-Differentiated Pricing, 5.3 Economics: Brokering, Bidding, and Auctioning, 6.0 Regulatory, and 7.0 General. Although the content of many publications spanned two or more of these sections, the desire to limit document length required that all publications be placed in the single most appropriate section. Publications are sorted according to author or publication resource.

Lankford, C.B. [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States)] [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States); McCalley, J.D. [Iowa State Univ., Ames, IA (United States)] [Iowa State Univ., Ames, IA (United States); Saini, N.K. [Entergy Services Corp., Metairie, LA (United States)] [Entergy Services Corp., Metairie, LA (United States)

1996-02-01T23:59:59.000Z

95

Office of Electricity Delivery And Energy Reliability To Hold...  

Broader source: Energy.gov (indexed) [DOE]

Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission Office of Electricity Delivery And Energy...

96

Electric utility transmission and distribution upgrade deferral benefits from modular electricity storage : a study for the DOE Energy Storage Systems Program.  

SciTech Connect (OSTI)

The work documented in this report was undertaken as part of an ongoing investigation of innovative and potentially attractive value propositions for electricity storage by the United States Department of Energy (DOE) and Sandia National Laboratories (SNL) Electricity Storage Systems (ESS) Program. This study characterizes one especially attractive value proposition for modular electricity storage (MES): electric utility transmission and distribution (T&D) upgrade deferral. The T&D deferral benefit is characterized in detail. Also presented is a generalized framework for estimating the benefit. Other important and complementary (to T&D deferral) elements of possible value propositions involving MES are also characterized.

Eyer, James M. (Distributed Utility Associates, Inc., Livermore, CA)

2009-06-01T23:59:59.000Z

97

Reliability Assessment The Reliability of the  

E-Print Network [OSTI]

2006 Long-Term Reliability Assessment The Reliability of the Bulk Power Systems In North America North American Electric Reliability Council October 2006 #12;TABLE OF CONTENTS Page 2 NERC 2006 Long-Term Reliability Assessment TABLE OF CONTENTS INTRODUCTION

98

Reliability Tools for Resonance Inspection of Light Metal Castings...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Reliability Tools for Resonance Inspection of Light Metal Castings Reliability Tools for Resonance Inspection of Light Metal Castings 2012 DOE Hydrogen and Fuel Cells Program and...

99

Texas Uses Phasors to Increase Electricity Reliability | Department...  

Broader source: Energy.gov (indexed) [DOE]

Texas Uses Phasors to Increase Electricity Reliability Texas Uses Phasors to Increase Electricity Reliability March 31, 2011 - 12:57pm Addthis Merrill Smith Program Manager, Office...

100

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

2006. Transmission and Wind Energy: Capturing the Prevailingand Renewable Energy (Wind & Hydropower Technologiesand Renewable Energy Wind & Hydropower Technologies Program

Mills, Andrew D.

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Transmission Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Return to Daylight Saving Time Posted: 2232015 Effective Date: 382015 This document provides the procedure for reserving and scheduling transmission that spans the time change...

102

Arnold Schwarzenegger REAL-TIME GRID RELIABILITY  

E-Print Network [OSTI]

Arnold Schwarzenegger Governor REAL-TIME GRID RELIABILITY MANAGEMENT Prototype Phasor-Based Real Research Program Prepared By: Lawrence Berkeley National Laboratory Consortium for Electric Reliability in this report. #12;#12;USER GUIDE Version 3 August 2005 Prepared by: for Consortium for Electric Reliability

103

Loss-Resilient Proactive Data Transmission in Wireless Sensor Networks  

E-Print Network [OSTI]

environments. Moreover, sensor nodes are con- strained by energy, computation power and storage. Existing to the destination without loss. However, existing reliable transmission techniques either are too costly forecast, structural condition assessment) require reliable data communications, such that a target

Xu, Jianliang

104

EIS-0317: Kangley-Echo Lake Transmission Line Project  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

105

High voltage overhead long transmission line design and fault analysis.  

E-Print Network [OSTI]

??The goal of this project is to design a reliable high voltage overhead long transmission line that satisfies specific design criteria including voltage regulation, efficiency,… (more)

Elzain, Mohamed Ali

2011-01-01T23:59:59.000Z

106

Department of Energy Finalizes Loan Guarantee for New Transmission...  

Office of Environmental Management (EM)

Nevada, improving grid reliability and efficiency. "As our country increases its use of alternative energy sources, new transmissions lines like the ON Line project will play a...

107

Technical Advice and Support for the Joint Integrated Non-Intrusive Inspection (JINII) Program Task 2.2 Transmission Digital Radiography (DR)  

SciTech Connect (OSTI)

The Cargo Advanced Automated Radiography System (CAARS) program aims to utilize advanced radiographic systems to detect radiological and nuclear threats. Validation of initial design and testing concepts is a precondition for prototype system development and large-scale deployment. As expected, Depleted Uranium (DU) is a valid surrogate for Special Nuclear Materials (SNM) in CAARS Advanced Technology Demonstration (ATD) performance field-tests of transmission radiography systems. Dual-energy transmission measurements of DU are nearly identical to SNM, and are distinct from lower Z materials, provided the samples are matched to equal areal density. Results from an alternative method, using samples of equal thickness, showed sample discrimination by material density, rather than by atomic number (Z). The transmission measurements of DU and SNM were made with equipment that is nearly identical to current field systems. X-ray source beams at endpoint energies of 5.4 MeV and 9.6 MeV were used to measure transmission through the selected sample materials. The ratio of the x-ray linear attenuation coefficient times length ({micro}L) at 5.4 MeV, to {micro}L at 9.6 MeV is a metric for atomic number based discrimination of materials. The measured ratios were compared with computed values based on LLNL photon cross section data and LLNL developed models of x-ray detector characteristics. Measured ratios for DU differed from HEU by an average of 0.25%, and from WGPu by 0.08%, which is within the noise level of 0.4 to 0.5%. For comparison, measured ratios for Sn differed from HEU by 3.2%, and from WGPu by 3.6%, well beyond the measurement noise. Measured ratios for W differed from HEU by 0.01%, and from WGPu by 0.32%. The measured ratio values presented in Table 1 demonstrate the feasibility of using a threshold ratio to discriminate low-Z (Z < 72) from high-Z (Z {ge} 72) materials (as defined by CAARS specification). In the case of our test system, a threshold ratio of 1.08 would be suitable based on the measured results.

Martz, H; Chinn, D; Pincus, C

2011-03-03T23:59:59.000Z

108

Sandia National Laboratories: Physics of Reliability: Evaluating...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar program Sandia R&D Funded under New DOE SunShot Program On November 27, 2013, in Energy,...

109

Hydrogen Delivery Technologies and Pipeline Transmission of Hydrogen  

E-Print Network [OSTI]

Hydrogen Delivery Technologies and Systems Pipeline Transmission of Hydrogen Strategic Initiatives, and Infrastructure Technologies Program #12;Pipeline Transmission of Hydrogen --- 2 Copyright: Design & Operation development) #12;Pipeline Transmission of Hydrogen --- 3 Copyright: Future H2 Infrastructure Wind Powered

110

Transmission Services J7000  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Business Unit - J7300 CRSP - DSW - RMR Open Access Transmission Tariff Management Transmission Service Requests Interconnection Requests OASIS...

111

Software Reliability Xiangyu Zhang  

E-Print Network [OSTI]

1 Software Reliability Xiangyu Zhang Pronounced as Shang You Zang CS590F Software Reliability Software Reliability Why Reliable Software is Important? Software bugs cost the U.S. economy about $59 in Spacecraft Accidents (http://sunnyday.mit.edu/papers/jsr.pdf) CS590F Software Reliability Why ? ­ FSE'06

Zhang, Xiangyu

112

Transmission Congestion Study COMMENTS OF CONSOLIDATED EDISION...  

Broader source: Energy.gov (indexed) [DOE]

loads and improving reliability through the use of aggressive energy efficiency and demand response programs, and has added new generation since 2006." And, at the Workshop,...

113

Transmission INTRODUCTION  

E-Print Network [OSTI]

, to a significant degree, on a well-functioning wholesale power market. The transmission system is integral the consequences of a poorly designed wholesale power market, and the Council does not want to see those Regulatory Commission began taking actions to further facilitate competition in wholesale power supply. Today

114

Regional Transmission Projects: Finding Solutions  

SciTech Connect (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

115

E-Print Network 3.0 - achieve reliable information Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

search results for: achieve reliable information Page: << < 1 2 3 4 5 > >> 1 On the Reliability of Backbone-Assisted End-to-End Transmissions in WSNs Summary: , to achieve higher...

116

Logic Synthesis for FPGA Reliability  

E-Print Network [OSTI]

for FPGA Reliability . . . . . . . . . . . . . Hard ErrorsStochastic Resynthesis for FPGA Reliability . . . . . .In-Place Reconfiguration for FPGA Reliability . . . . . .

Feng, Zhe

2013-01-01T23:59:59.000Z

117

Transmission Workshop  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof theRestorationAdvisoryManagement andTopKnow? |Transmission

118

Final Report Navajo Transmission Project (NTP)  

SciTech Connect (OSTI)

The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

Bennie Hoisington; Steven Begay

2006-09-14T23:59:59.000Z

119

Thin Film Reliability SEMICONDUCTORS  

E-Print Network [OSTI]

Thin Film Reliability SEMICONDUCTORS Our goal is to develop new ways to evaluate the reliability $250 billion per year. As semiconductor devices become ultra miniaturized, reliability testing becomes-world conditions as possible will enable product designers to better balance performance and reliability

120

Reliability-Centered Maintenance  

Broader source: Energy.gov [DOE]

Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

North American Electric Reliability Corporation (NERC): Reliability...  

Broader source: Energy.gov (indexed) [DOE]

and winter and summer forecasts; monitors the bulk power systems; and educates, trains, and certifies industry personnel. North American Electric Reliability Corporation...

122

NWCC Transmission Case Study III  

SciTech Connect (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

123

A case study review of technical and technology issues for transition of a utility load management program to provide system reliability resources in restructured electricity markets  

E-Print Network [OSTI]

Issues for Transition of a Utility Load Management ProgramSCE’s load management system is to transition from providinga transition from SCE’s current load management system to an

Weller, G.H.

2001-01-01T23:59:59.000Z

124

Optoelectronics 514 Transmission Hologram Transmission Hologram  

E-Print Network [OSTI]

Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

Collins, Gary S.

125

Power electronics reliability analysis.  

SciTech Connect (OSTI)

This report provides the DOE and industry with a general process for analyzing power electronics reliability. The analysis can help with understanding the main causes of failures, downtime, and cost and how to reduce them. One approach is to collect field maintenance data and use it directly to calculate reliability metrics related to each cause. Another approach is to model the functional structure of the equipment using a fault tree to derive system reliability from component reliability. Analysis of a fictitious device demonstrates the latter process. Optimization can use the resulting baseline model to decide how to improve reliability and/or lower costs. It is recommended that both electric utilities and equipment manufacturers make provisions to collect and share data in order to lay the groundwork for improving reliability into the future. Reliability analysis helps guide reliability improvements in hardware and software technology including condition monitoring and prognostics and health management.

Smith, Mark A.; Atcitty, Stanley

2009-12-01T23:59:59.000Z

126

Electricity Transmission, A Primer  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatementNOTElectricity Transmission System

127

Transmission SEAB Presentation  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of EnergyProgram2-26 Date: March 2, 2012Department ofTransmissionOvercoming

128

Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System Equipment  

E-Print Network [OSTI]

most state of the art reliability centered maintenance (RCM) approaches, but it also accounts equipment, maintenance, reliability, risk, security, optimization 1.Introduction Maintenance of bulk1 Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System

129

Analysis of A Loss-Resilient Proactive Data Transmission Protocol in Wireless Sensor Networks  

E-Print Network [OSTI]

nodes are constrained by energy, computation power and storage. Existing reliable transmission, limited energy, and constrained computation and storage capacity. To optimize the performance without loss. However, existing reliable trans- mission techniques either are too costly for resource

Lee, Dongwon

130

Design and fault analysis of a 345KV 220 mile overhead transmission line.  

E-Print Network [OSTI]

??Efficient and reliable transmission of bulk power economically benefits both the power company and consumer. This report gives clarification to concept and procedure in design… (more)

Clawson, Greg

2012-01-01T23:59:59.000Z

131

Technique for Measuring Hybrid Electronic Component Reliability  

SciTech Connect (OSTI)

Materials compatibility studies of aged, engineered materials and hardware are critical to understanding and predicting component reliability, particularly for systems with extended stockpile life requirements. Nondestructive testing capabilities for component reliability would significantly enhance lifetime predictions. For example, if the detection of crack propagation through a solder joint can be demonstrated, this technique could be used to develop baseline information to statistically determine solder joint lifelengths. This report will investigate high frequency signal response techniques for nondestructively evaluating the electrical behavior of thick film hybrid transmission lines.

Green, C.C.; Hernandez, C.L.; Hosking, F.M.; Robinson, D.; Rutherford, B.; Uribe, F.

1999-01-01T23:59:59.000Z

132

Reliability Results of NERSC Systems  

E-Print Network [OSTI]

Reliability Results of NERSC Systems Akbar Mokhtarani,analysis of systems reliability and component failure rates,reported to operation. Reliability Data HPSS and the IBM SP

Mokhtarani, Akbar; Petascale Data Storage Institute (PDSI)

2008-01-01T23:59:59.000Z

133

Reliable Packet Transmissions in Multipath Routed Wireless Networks  

E-Print Network [OSTI]

probability of packet loss (PPL) in wireless networks. Path diversification uses erasure codes and multiple this case blind load balancing. We show that for low PPL, blind load balancing outperforms single the fragments. We show how to distribute the fragments for minimized PPL, and maximized efficiency given a bound

Valaee, Shahrokh

134

Joint transmission system projects to improve system reliability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfraredJefferson LabJeffersonStandardsWelcomeJohnTri-LabJoint Trade5 12

135

2012 Transmission and Energy Storage Peer Review Presentations Available  

Broader source: Energy.gov [DOE]

Presentations from theTransmission Reliability R&D Load as a Resource peer review and Energy Storage Systems peer review, both held in September 2012, are now available.

136

Financing a National Transmission Grid: What Are the Issues?  

E-Print Network [OSTI]

The United States requires a substantial investment in transmission capacity over the next several decades. This investment is needed to ensure system reliability, to accommodate growth in demand for electricity, and to ...

Metcalf, Gilbert E.

137

Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.  

SciTech Connect (OSTI)

This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.

Eyer, James M. (Distributed Utility Associates, Livermore, CA); Butler, Paul Charles; Iannucci, Joseph J., Jr. (,.Distributed Utility Associates, Livermore, CA)

2005-11-01T23:59:59.000Z

138

Reliability of Electrical Interconnects  

Broader source: Energy.gov [DOE]

2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

139

Reliability of Bonded Interfaces  

Broader source: Energy.gov [DOE]

2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

140

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Merchant transmission investment  

E-Print Network [OSTI]

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

142

Medical Device Reliability BIOMATERIALS  

E-Print Network [OSTI]

NEMI Medical Electronics team to address short- and long-term reliability issues with medical devices. OurMedical Device Reliability BIOMATERIALS Our goal is to provide medical device manufacturers, and consistency of active implantable medical devices. These devices, including pacemakers, cardiac defibrillators

143

Transmission Investment Timing and Sizing under Uncertainty Afzal Siddiqui  

E-Print Network [OSTI]

of a private investor holding a perpetual option to construct a transmission line. Using the real options-reverting process 1 Introduction Given the dependence of modern society on electricity, increased reliability than cost reduction. In deregulated electricity industries with functioning markets, transmission

Guillas, Serge

144

Supplement Analysis for the Transmission System Vegetation Management...  

Broader source: Energy.gov (indexed) [DOE]

14, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOEEIS-0285SA-35) James Jellison - TFOOlympia...

145

Supplement Analysis for the Transmission System Vegetation Management...  

Broader source: Energy.gov (indexed) [DOE]

5, 2001 REPLY TO ATTN OF: KEPZ992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOEEIS-0285SA-25) Elizabeth Johnson - TFRThe...

146

Photovoltaic system reliability  

SciTech Connect (OSTI)

This paper discusses the reliability of several photovoltaic projects including SMUD`s PV Pioneer project, various projects monitored by Ascension Technology, and the Colorado Parks project. System times-to-failure range from 1 to 16 years, and maintenance costs range from 1 to 16 cents per kilowatt-hour. Factors contributing to the reliability of these systems are discussed, and practices are recommended that can be applied to future projects. This paper also discusses the methodology used to collect and analyze PV system reliability data.

Maish, A.B.; Atcitty, C. [Sandia National Labs., NM (United States); Greenberg, D. [Ascension Technology, Inc., Lincoln Center, MA (United States)] [and others

1997-10-01T23:59:59.000Z

147

CERTS: Consortium for Electric Reliability Technology Solutions - Research Highlights  

SciTech Connect (OSTI)

Historically, the U.S. electric power industry was vertically integrated, and utilities were responsible for system planning, operations, and reliability management. As the nation moves to a competitive market structure, these functions have been disaggregated, and no single entity is responsible for reliability management. As a result, new tools, technologies, systems, and management processes are needed to manage the reliability of the electricity grid. However, a number of simultaneous trends prevent electricity market participants from pursuing development of these reliability tools: utilities are preoccupied with restructuring their businesses, research funding has declined, and the formation of Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs) to operate the grid means that control of transmission assets is separate from ownership of these assets; at the same time, business uncertainty, and changing regulatory policies have created a climate in which needed investment for transmission infrastructure and tools for reliability management has dried up. To address the resulting emerging gaps in reliability R&D, CERTS has undertaken much-needed public interest research on reliability technologies for the electricity grid. CERTS' vision is to: (1) Transform the electricity grid into an intelligent network that can sense and respond automatically to changing flows of power and emerging problems; (2) Enhance reliability management through market mechanisms, including transparency of real-time information on the status of the grid; (3) Empower customers to manage their energy use and reliability needs in response to real-time market price signals; and (4) Seamlessly integrate distributed technologies--including those for generation, storage, controls, and communications--to support the reliability needs of both the grid and individual customers.

Eto, Joseph

2003-07-30T23:59:59.000Z

148

Reliability and Safety  

Broader source: Energy.gov [DOE]

DOE solar reliability and safety research and development (R&D) focuses on testing photovoltaic (PV) modules, inverters, and systems for long-term performance, and helping investors, consumers,...

149

Reliability Standards Owner  

Broader source: Energy.gov [DOE]

This position is located in the Internal Operations and Asset Management group of Planning and Asset Management (TP). A successful candidate in this position will serve as the Reliability Standards...

150

Dynamic Line Rating Oncor Electric Delivery Smart Grid Program  

SciTech Connect (OSTI)

Electric transmission lines are the lifeline of the electric utility industry, delivering its product from source to consumer. This critical infrastructure is often constrained such that there is inadequate capacity on existing transmission lines to efficiently deliver the power to meet demand in certain areas or to transport energy from high-generation areas to high-consumption regions. When this happens, the cost of the energy rises; more costly sources of power are used to meet the demand or the system operates less reliably. These economic impacts are known as congestion, and they can amount to substantial dollars for any time frame of reference: hour, day or year. There are several solutions to the transmission constraint problem, including: construction of new generation, construction of new transmission facilities, rebuilding and reconductoring of existing transmission assets, and Dynamic Line Rating (DLR). All of these options except DLR are capital intensive, have long lead times and often experience strong public and regulatory opposition. The Smart Grid Demonstration Program (SGDP) project co-funded by the Department of Energy (DOE) and Oncor Electric Delivery Company developed and deployed the most extensive and advanced DLR installation to demonstrate that DLR technology is capable of resolving many transmission capacity constraint problems with a system that is reliable, safe and very cost competitive. The SGDP DLR deployment is the first application of DLR technology to feed transmission line real-time dynamic ratings directly into the system operation’s State Estimator and load dispatch program, which optimizes the matching of generation with load demand on a security, reliability and economic basis. The integrated Dynamic Line Rating (iDLR)1 collects transmission line parameters at remote locations on the lines, calculates the real-time line rating based on the equivalent conductor temperature, ambient temperature and influence of wind and solar radiation on the stringing section, transmits the data to the Transmission Energy Management System, validates its integrity and passes it on to Oncor and ERCOT (Electric Reliability Council of Texas) respective system operations. The iDLR system is automatic and transparent to ERCOT System Operations, i.e., it operates in parallel with all other system status telemetry collected through Supervisory Control and Data Acquisition (SCADA) employed across the company.

Johnson, Justin; Smith, Cale; Young, Mike; Donohoo, Ken; Owen, Ross; Clark, Eddit; Espejo, Raul; Aivaliotis, Sandy; Stelmak, Ron; Mohr, Ron; Barba, Cristian; Gonzalez, Guillermo; Malkin, Stuart; Dimitrova, Vessela; Ragsdale, Gary; Mitchem, Sean; Jeirath, Nakul; Loomis, Joe; Trevino, Gerardo; Syracuse, Steve; Hurst, Neil; Mereness, Matt; Johnson, Chad; Bivens, Carrie

2013-05-04T23:59:59.000Z

151

Real Time Grid Reliability Management 2005  

SciTech Connect (OSTI)

The increased need to manage California?s electricity grid in real time is a result of the ongoing transition from a system operated by vertically-integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management -- construction of new transmission lines -- has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools. This project: (1) developed and conducted first-ever demonstrations of two prototype real-time software tools for voltage security assessment and phasor monitoring; and (2) prepared a scoping study on improving load and generator response models. Additional funding through two separate subsequent work authorizations has already been provided to build upon the work initiated in this project.

Eto, Joe; Eto, Joe; Lesieutre, Bernard; Lewis, Nancy Jo; Parashar, Manu

2008-07-07T23:59:59.000Z

152

Transmission Rights and Market Power James Bushnell  

E-Print Network [OSTI]

wholesale electricity markets, and their associated Independent System Operators (ISOs), now formingPWP-062 Transmission Rights and Market Power James Bushnell April, 1999 This paper is part of the working papers series of the Program on Workable Energy Regulation (POWER). POWER is a program

California at Berkeley. University of

153

Parametric probability distributions in reliability  

E-Print Network [OSTI]

Parametric probability distributions in reliability F.P.A. Coolen Department of Mathematical parametric probability distributions which are frequently used in reliability. We present some main as models for specific reliability scenarios. Keywords: Binomial distribution, Exponential distribution

Coolen, Frank

154

Gearbox Reliability Collaborative Update (Presentation)  

SciTech Connect (OSTI)

This presentation was given at the Sandia Reliability Workshop in August 2013 and provides information on current statistics, a status update, next steps, and other reliability research and development activities related to the Gearbox Reliability Collaborative.

Sheng, S.

2013-10-01T23:59:59.000Z

155

EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

156

Sandia National Laboratories: Inverter Reliablity Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLS Exhibit

157

Coiled transmission line pulse generators  

DOE Patents [OSTI]

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

158

Photovoltaic module reliability workshop  

SciTech Connect (OSTI)

The paper and presentations compiled in this volume form the Proceedings of the fourth in a series of Workshops sponsored by Solar Energy Research Institute (SERI/DOE) under the general theme of photovoltaic module reliability during the period 1986--1990. The reliability Photo Voltaic (PV) modules/systems is exceedingly important along with the initial cost and efficiency of modules if the PV technology has to make a major impact in the power generation market, and for it to compete with the conventional electricity producing technologies. The reliability of photovoltaic modules has progressed significantly in the last few years as evidenced by warranties available on commercial modules of as long as 12 years. However, there is still need for substantial research and testing required to improve module field reliability to levels of 30 years or more. Several small groups of researchers are involved in this research, development, and monitoring activity around the world. In the US, PV manufacturers, DOE laboratories, electric utilities and others are engaged in the photovoltaic reliability research and testing. This group of researchers and others interested in this field were brought together under SERI/DOE sponsorship to exchange the technical knowledge and field experience as related to current information in this important field. The papers presented here reflect this effort.

Mrig, L. (ed.)

1990-01-01T23:59:59.000Z

159

Transmission Commercial Project Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

160

Increasing the Reliability of Reliability Jochen Brocker1,  

E-Print Network [OSTI]

Increasing the Reliability of Reliability Diagrams Jochen Br¨ocker1, and Leonard A. Smith1,2 1 University Oxford, UK Corresponding Author, cats@lse.ac.uk November 9, 2006 #12;Abstract The reliability are reliable. Further, an alternative presentation of the same information on probability paper easies

Stevenson, Paul

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Integration of NDE Reliability and Fracture Mechanics  

SciTech Connect (OSTI)

The Pacific Northwest Laboratory is conducting a four-phase program for measuring and evaluating the effectiveness and reliability of in-service inspection (lSI} performed on the primary system piping welds of commercial light water reactors (LWRs). Phase I of the program is complete. A survey was made of the state of practice for ultrasonic rsr of LWR primary system piping welds. Fracture mechanics calculations were made to establish required nondestrutive testing sensitivities. In general, it was found that fatigue flaws less than 25% of wall thickness would not grow to failure within an inspection interval of 10 years. However, in some cases failure could occur considerably faster. Statistical methods for predicting and measuring the effectiveness and reliability of lSI were developed and will be applied in the "Round Robin Inspections" of Phase II. Methods were also developed for the production of flaws typical of those found in service. Samples fabricated by these methods wilI be used in Phase II to test inspection effectiveness and reliability. Measurements were made of the influence of flaw characteristics {i.e., roughness, tightness, and orientation) on inspection reliability. These measurernents, as well as the predictions of a statistical model for inspection reliability, indicate that current reporting and recording sensitivities are inadequate.

Becker, F. L.; Doctor, S. R.; Heas!er, P. G.; Morris, C. J.; Pitman, S. G.; Selby, G. P.; Simonen, F. A.

1981-03-01T23:59:59.000Z

162

Measurement Practices for Reliability and Power Quality  

SciTech Connect (OSTI)

This report provides a distribution reliability measurement ''toolkit'' that is intended to be an asset to regulators, utilities and power users. The metrics and standards discussed range from simple reliability, to power quality, to the new blend of reliability and power quality analysis that is now developing. This report was sponsored by the Office of Electric Transmission and Distribution, U.S. Department of Energy (DOE). Inconsistencies presently exist in commonly agreed-upon practices for measuring the reliability of the distribution systems. However, efforts are being made by a number of organizations to develop solutions. In addition, there is growing interest in methods or standards for measuring power quality, and in defining power quality levels that are acceptable to various industries or user groups. The problems and solutions vary widely among geographic areas and among large investor-owned utilities, rural cooperatives, and municipal utilities; but there is still a great degree of commonality. Industry organizations such as the National Rural Electric Cooperative Association (NRECA), the Electric Power Research Institute (EPRI), the American Public Power Association (APPA), and the Institute of Electrical and Electronics Engineers (IEEE) have made tremendous strides in preparing self-assessment templates, optimization guides, diagnostic techniques, and better definitions of reliability and power quality measures. In addition, public utility commissions have developed codes and methods for assessing performance that consider local needs. There is considerable overlap among these various organizations, and we see real opportunity and value in sharing these methods, guides, and standards in this report. This report provides a ''toolkit'' containing synopses of noteworthy reliability measurement practices. The toolkit has been developed to address the interests of three groups: electric power users, utilities, and regulators. The report will also serve to support activities to develop and share information among industry and regulatory participants about critical resources and practices. The toolkit has been developed by investigating the status of indices and definitions, surveying utility organizations on information sharing, and preparing summaries of reliability standards and monitoring requirements--the issues, needs, work under way, existing standards, practices and guidelines--for the following three classifications: (1) terms and definitions of reliability; (2) power quality standards, guidelines, and measurements; and (3) activities and organizations developing and sharing information on distribution reliability. As these synopses of reliability measurement practices are provided, it must be noted that an economic penalty may be associated with requiring too high a reliability level from the distribution system for all customers. It may be appropriate for the distribution system to supply only some base, generally accepted level of reliability. This base level would be adequate for the majority of customers. Users who need a higher level may find it economical to supply using distributed energy resources (DER) and other local solutions to reliability and power quality needs. Local solutions implemented by the customer may be the most cost-effective method for addressing the more stringent needs of a digital economy. These local solutions include energy storage, small distributed generators, and microgrids. This report also considers the market's role in addressing reliability issues and requirements. The customer's needs are discussed in view of issues such as power quality requirements of digital electronic equipment, the cost of outages, the cost of storage and new infrastructure, and natural gas prices. The market role in addressing these issues and requirements is explored. The economic considerations associated with the reliability issues are discussed, as well as the levels at which these economic decisions could be made. Finally, a discussion is provided of the role DER could play in addressing

Kueck, JD

2005-05-06T23:59:59.000Z

163

RELIABILITY PLANNING IN DISTRIBUTED ELECTRIC ENERGY SYSTEMS  

E-Print Network [OSTI]

RESILIENCE; OR RELIABILITY SENSITIVITy .. RiskReliability Planning: Preliminary Definitions.Dioision, Ext. 6782 Reliability Planning in Distributed

Kahn, E.

2011-01-01T23:59:59.000Z

164

North American Electric Reliability Corporation Interconnections...  

Office of Environmental Management (EM)

North American Electric Reliability Corporation Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability...

165

Software Reliability Modeling James LEDOUX  

E-Print Network [OSTI]

Software Reliability Modeling James LEDOUX Centre de Math´ematiques INSA & IRMAR 20 Avenue des an overview of some aspects of Software Reliability (SR) engineering. Most systems are now driven by software in reliability engineering, particularly in terms of cost. But predicting software reliability is not easy

Paris-Sud XI, Université de

166

Reliability of Electrical Interconnects (Presentation)  

SciTech Connect (OSTI)

This presentation discusses the status of NREL's research on the reliability of electrical interconnects.

Devoto, D.

2014-06-01T23:59:59.000Z

167

Automated manual transmission controller  

DOE Patents [OSTI]

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

168

Dave, Corbus, Energy Reliability in a Changing Landscape  

Broader source: Energy.gov (indexed) [DOE]

Energy Reliability in a Changing Landscape Dave Corbus Laboratory Program Manager, Electricity Systems Federal U )lity P artnership Working G roup M ee)ng January 1 415 th , 2 014...

169

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect (OSTI)

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

170

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

171

Electric Transmission Lines (Nebraska)  

Broader source: Energy.gov [DOE]

The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway crossings. This section contains general regulations...

172

Patterns of transmission investment  

E-Print Network [OSTI]

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

173

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

Authors James Bartridge Judy Grau Mark Hesters Don Kondoleon Chuck Najarian Contributing Authors Grace: Bartridge, James, Judy Grau, Mark Hesters, Don Kondoleon, Chuck Najarian. 2007 Strategic Transmission

174

Collaborative Transmission Technology Roadmap  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

techniques, and tools to analyze data from power quality recorders Size-up demand response opportunities Transmission level monitoring with PMUs is not sufficient and needs to...

175

Electricity transmission: an overview of the current debate  

E-Print Network [OSTI]

is called on to perform an increasing role in supporting an effectively competitive power market. Both cross-border and internal transmission management demands raise a whole set of highly complex issues of both academic interest and policy relevance... transmission are very high, and the costs of somewhat over-building the network are rather modest, those charged with ensuring reliable supplies are likely to err on the side of too much rather than too little spare capacity. This further depresses...

Brunekreeft, Gert; Neuhoff, Karsten; Newbery, David

2006-03-14T23:59:59.000Z

176

Electric Transmission Line Siting Compact  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement Tuesday,DepartmentTheandElectric Transmission

177

Reliable solar: powering communities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromising ScienceRecentRegionalReliability Technology earns

178

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

179

Transmission Enhancement Technology Report  

E-Print Network [OSTI]

of Existing Transmission 6 5. Potential New Equipment to Improve Transmission Capability 9 6. Potential New parties for the sites that should be studied as potential locations for new generation and to consult lignite and wind energy. " As per the requirements of the above-referenced Congressional direction

180

ARMY VEHICLE DURABILITY OPTIMIZATION & RELIABILITY  

E-Print Network [OSTI]

ARMY VEHICLE DURABILITY OPTIMIZATION & RELIABILITY How to Optimize the Vehicle Design to Minimize/Reduce the Weight? Under These Uncertainties, How to Achieve Component Level Reliability? Under These Uncertainties, How to Achieve System Level Reliability? Dynamics Analysis FE Model System Model Dynamic Stress

Kusiak, Andrew

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

FIELD RELIABILITY OF ELECTRONIC SYSTEMS  

E-Print Network [OSTI]

I Ww i 1 i FIELD RELIABILITY OF ELECTRONIC SYSTEMS wcwotoias R I S 0 - M - 2 4 1 8 An analytical study of in-the fiald axparlanca of electronics reliability Tag© Elm Rise National Laboratory, DK-4000 Roskilde, Denmark February 1 0 8 4 #12;RIS�-M-2418 FIELD RELIABILITY OP ELECTRONIC SYSTEMS An analytical

182

Reliability onMultilayerModels  

E-Print Network [OSTI]

Network Reliability Analysis Based onMultilayerModels László Jereb, Péter Bajor, Attila Kiss a reliability analysis approach which is based on the multilayer model of the telecommunication network. Simple two­state reliability models are assigned to the network elements making it possible to describe

László, Jereb

183

Testing for PV Reliability (Presentation)  

SciTech Connect (OSTI)

The DOE SUNSHOT workshop is seeking input from the community about PV reliability and how the DOE might address gaps in understanding. This presentation describes the types of testing that are needed for PV reliability and introduces a discussion to identify gaps in our understanding of PV reliability testing.

Kurtz, S.; Bansal, S.

2014-09-01T23:59:59.000Z

184

Energy Transmission and Infrastructure  

SciTech Connect (OSTI)

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

185

Integrated Transmission and Distribution Control  

SciTech Connect (OSTI)

Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

2013-01-16T23:59:59.000Z

186

State Research, Outreach, and Technical Assistance to Imrove the Nation's Transmission & Distribution System  

SciTech Connect (OSTI)

The broad purpose of this project was to work cooperatively with the DOE to explore technology nad policy issues associated with more efficient, reliable, and affordable electric transmission and distribution use.

J. Fox; M. Keogh; A. Spahn

2009-05-20T23:59:59.000Z

187

Transmission resonances in the bipolar quantum resonant tunneling transistor  

E-Print Network [OSTI]

MODEL CALCULATIONS Simple Wells Barriers and Nonparabolicity 16 20 IV CONCLUSION: DEVICES AND RESULTS 26 Collector Geometry Profile Evolution Results . 27 30 32 REFERENCES APPENDIX 36 A COMPUTER PROGRAMS Transmission (Parabolic...) . Transmission (Nonparabolic) Bound States and Wavefunctions (Parabolic). . . . Bound States and Wavefunctions (Nonparabolic) . Resonant Slopes (Parabolic) . Resonant Slopes (Nonparabolic) 37 41 46 52 59 64 VITA 68 LIST OF FIGURES FIGURE Page...

Mondragon, Antonio Richard

1996-01-01T23:59:59.000Z

188

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

189

Remarks Concerning the Public Utility Commission of Texas Study on Bulk Power Transmission  

E-Print Network [OSTI]

REMARKS CONCERNING THE PUBLIC UTILITY COMMISSION OF TEXAS STUDY ON BULK POWER TRANSMISSION R. T. SWEATMAN Executive Director Electric Reliability Council of Texas The citizens of Texas need reliable electric service. Our economy, our way... amounts of transmission capacity must alwavs be available in the event generation is lost in one area, so that the other utility's power can be transmitted to the utility in need. A pipeline system can suffer equipment outages easily, without loss...

Sweatman, R. T.

190

A Reliability Model for Nonhomogeneous Redundant Software Versions with Correlated Failures  

E-Print Network [OSTI]

A Reliability Model for Nonhomogeneous Redundant Software Versions with Correlated Failures Walter Abstract: The article develops a technique for computing the reliability (1) of a recovery block with fault{version programming, soft- ware reliability. 1 Introduction An important issue in the evaluation and optimization

Gutjahr, Walter

191

Western Area Power Administration Transmission Infrastructure Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNG IHDR€ÍSolar Energy SystemsFebruary 7-8,March 8,8)Normal 27 14,2TOPICS Western

192

Maximal Reliability for Unit-weighted Composites  

E-Print Network [OSTI]

precisely measure scale reliability. In H. Yanai, A. Okada,A useful indicator of reliability? Personality & IndividualJ. M. F. (2000). Linking reliability and factor analysis:

Peter M. Bentler

2011-01-01T23:59:59.000Z

193

RELIABILITY IMPROVEMENT OF BART TRAIN CONTROL  

E-Print Network [OSTI]

it was a response to the reliability problems introduced by~atelyowned rights. RELIABILITY IMPROVEMENT OF BART VEHICLEtask group to improve the reliability of the Bay Area Rapid

Turner, D.B.

2011-01-01T23:59:59.000Z

194

Microgrids and Heterogeneous Power Quality and Reliability  

E-Print Network [OSTI]

high security, quality, reliability, and availability”, IEEELave, and Marija Ilic: “Creating Reliability Choice: HowBuilding Less Reliability into Electric Power Grids Could

Marnay, Chris

2008-01-01T23:59:59.000Z

195

Optimization for Design and Operation of Natural Gas Transmission Networks  

E-Print Network [OSTI]

and compressor stations. On an existing network, the model also optimizes the total flow through pipelines that satisfy demand to determine the best purchase amount of gas. A mixed integer nonlinear programming model for steady-state natural gas transmission...

Dilaveroglu, Sebnem 1986-

2012-08-22T23:59:59.000Z

196

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

197

Down hole transmission system  

DOE Patents [OSTI]

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

198

Transmission Services Bulletin  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Standard Time On the first Sunday in November Transmission Services sets clocks from Daylight Savings Time (PD) back to Standard Time (PS). At 02:00 the time becomes 01:00. In...

199

Transmission Grid Integration  

Broader source: Energy.gov [DOE]

The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

200

Designing electricity transmission auctions  

E-Print Network [OSTI]

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EIS-0114: Fall River/Lower Valley Transmission System Reinforcement  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration developed this EIS to explore reinforcing the electrical transmission system in southeastern Idaho by adding a 161-kilovolt partly single- and double-circuit line from the Goshen to Drummond Substations in order to maintain reliable electric service in the area.

202

Electricity Policy Technical Assistance Program | Department...  

Energy Savers [EERE]

Program Electricity Policy Technical Assistance Program Overview Since 2003, the U.S. Department of Energy's Office of Electricity Delivery and Energy Reliability (OE) has been...

203

National Electric Transmission Congestion Study Webinars | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

204

Flexible Transmission in the Smart Grid  

E-Print Network [OSTI]

Planning . 102 vi Transmission Line Maintenance Scheduling 103 Just-in-time Transmission 103 Flexible Transmission in the Smart Grid

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

205

Honda Transmission Technical Center  

High Performance Buildings Database

Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

206

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

207

Planning considerations for the intermountain HVDC transmission system  

SciTech Connect (OSTI)

Planning of an HVDC transmission system embedded into an existing ac network may require unique control and converter equipment capability in order to satisfy stability requirements of the network. The planning and design of the Intermountain Power Project HVDC transmission system are based on unique control performance features for power transfers during terminal ac faults, rapid power recovery following fault clearing and utilization of exceptionally high transient overload capability of 2 per unit during the post-fault period to maintain system stability. The Department, in its efforts to meet the Western Systems Coordinating Council's (WSCC) reliability criteria, developed and incorporated into its HVDC specifications very rigorous reliability and availability requirements. One objective of this project was to attain the unusually low bipolar converter system outage frequency goal of one outage in five years to achieve a bipole performance rating equivalent to two ac circuits of similar capability. The reliability goals of this project have provided one of the impetus for revisions to the WSCC Reliability Criteria for System Design. The reliability goals and other features adopted for the Intermountain HVDC transmission system are discussed in this paper and study results are included to demonstrate the effectiveness of various controls implemented as stability enhancement techniques.

Lee, R.L.; Beshir, M.J.; Gee, J.H.

1986-01-01T23:59:59.000Z

208

Power Reliability at BASF Corporation  

E-Print Network [OSTI]

Power Reliability at BASF Corporation Thomas R. Theising Energy Systems Manager BASF Corporation ABSTRACT: Quality is defined not as what the supplier puts into the product but what the customer gets out and is willing to pay for. Power... of overcoming these problems. The approach of addressing the reliability of its utility systems is common within BASF. This paper will address one of BASF?s approaches to addressing Power Reliability. PROBLEM RECOGNITION: The first issue to address...

Theising, T. R.

2011-01-01T23:59:59.000Z

209

Power Reliability at BASF Corporation  

E-Print Network [OSTI]

Power Reliability at BASF Corporation Thomas R. Theising Energy Systems Manager BASF Corporation ABSTRACT: Quality is defined not as what the supplier puts into the product but what the customer gets out and is willing to pay for. Power... of overcoming these problems. The approach of addressing the reliability of its utility systems is common within BASF. This paper will address one of BASF?s approaches to addressing Power Reliability. PROBLEM RECOGNITION: The first issue to address...

Theising, T. R.

2012-01-01T23:59:59.000Z

210

CSD Safety and Reliability Data  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Reliability Data Forecourt CSD Workshop Argonne National Laboratory Kevin Harrison 20-Mar-2013 2 Approach - Composite Data Products CDPs DDPs Results Internal analysis completed...

211

A stochastic framework for uncertainty analysis in electric power transmission systems with wind generation  

E-Print Network [OSTI]

an electric transmission network with wind power generation and their impact on its reliability. A stochastic disconnections leading to massive network blackout. 1. Introduction Systems of electric power generation, supply of generating units, the transfer of electric power over networks of transmission lines and, finally

Paris-Sud XI, Université de

212

EIS-0378: Port Angeles-Juan de Fuca Transmission Project, WA  

Broader source: Energy.gov [DOE]

This EIS assesses DOE decision to approve the Sea Breeze Transmission project for a Presidential permit for through DOE's Office of Electricity Delivery and Energy Reliability and for approval for interconnection into the federal transmission system through the Bonneville Power Administration (BPA).

213

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona  

Broader source: Energy.gov [DOE]

Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

214

Sample sizes for confidence limits for reliability.  

SciTech Connect (OSTI)

We recently performed an evaluation of the implications of a reduced stockpile of nuclear weapons for surveillance to support estimates of reliability. We found that one technique developed at Sandia National Laboratories (SNL) under-estimates the required sample size for systems-level testing. For a large population the discrepancy is not important, but for a small population it is important. We found that another technique used by SNL provides the correct required sample size. For systems-level testing of nuclear weapons, samples are selected without replacement, and the hypergeometric probability distribution applies. Both of the SNL techniques focus on samples without defects from sampling without replacement. We generalized the second SNL technique to cases with defects in the sample. We created a computer program in Mathematica to automate the calculation of confidence for reliability. We also evaluated sampling with replacement where the binomial probability distribution applies.

Darby, John L.

2010-02-01T23:59:59.000Z

215

Continuous Reliability Enhancement for Wind (CREW) database : wind plant reliability benchmark.  

SciTech Connect (OSTI)

To benchmark the current U.S. wind turbine fleet reliability performance and identify the major contributors to component-level failures and other downtime events, the Department of Energy funded the development of the Continuous Reliability Enhancement for Wind (CREW) database by Sandia National Laboratories. This report is the third annual Wind Plant Reliability Benchmark, to publically report on CREW findings for the wind industry. The CREW database uses both high resolution Supervisory Control and Data Acquisition (SCADA) data from operating plants and Strategic Power Systems' ORAPWind%C2%AE (Operational Reliability Analysis Program for Wind) data, which consist of downtime and reserve event records and daily summaries of various time categories for each turbine. Together, these data are used as inputs into CREW's reliability modeling. The results presented here include: the primary CREW Benchmark statistics (operational availability, utilization, capacity factor, mean time between events, and mean downtime); time accounting from an availability perspective; time accounting in terms of the combination of wind speed and generation levels; power curve analysis; and top system and component contributors to unavailability.

Hines, Valerie Ann-Peters; Ogilvie, Alistair B.; Bond, Cody R.

2013-09-01T23:59:59.000Z

216

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

2002 REPLY TO ATTN OF: KEPRCovington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOEEIS-0285SA-37) Don Atkinson - TFN...

217

(DOE/EIS-0285/SA-43): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

27, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOEEIS-0285SA-43) William T. Erickson - TFP...

218

(DOE/EIS-0285/SA=32): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

15, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOEEIS-0285-SA-32) Bill Erickson - TPFWalla...

219

(DOE/EIS-0285/SA-45): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

2002. Analysis: This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and...

220

(DOE/EIS-0285/SA-5): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

March 30, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOEEIS-0285SA-5) - Big Eddy-Ostrander...

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

(DOE/EIS-0285/SA-46): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

2002. Analysis: This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and...

222

(DOE/EIS-0285/SA-36): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

24, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOEEIS-0285SA-38) Benjamin J. Tilley - TFEAlvey...

223

(DOE/EIS-0285/SA-06): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision...

224

(DOE/EIS-0285/SA-41): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision...

225

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance...  

Broader source: Energy.gov (indexed) [DOE]

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report The following information...

226

EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

227

Applying Reliability Models to the Space Shuttle  

E-Print Network [OSTI]

Applying Reliability Models to the Space Shuttle Norman F. Schneidewind Ted W. Keller #12;What are Reliability Models? Reliability Models are tools that Help Us: · Predict software Reliability. · Control software Reliability. · Assess software Reliability. This functions let an organization determine

Feitelson, Dror

228

Hybrid Transmission Corridor study  

SciTech Connect (OSTI)

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

229

FORMAL SEMANTICS AND VERIFICATION OF DYNAMIC RELIABILITY BLOCK DIAGRAMS FOR SYSTEM RELIABILITY MODELING  

E-Print Network [OSTI]

FORMAL SEMANTICS AND VERIFICATION OF DYNAMIC RELIABILITY BLOCK DIAGRAMS FOR SYSTEM RELIABILITY captured by existing reliability modeling tools. In this paper, we introduce a new reliability modeling tool, called dynamic reliability block diagrams (DRBD), for modeling dynamic relationships between

Xu, Haiping

230

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

231

Photovoltaic performance and reliability workshop  

SciTech Connect (OSTI)

This workshop was the sixth in a series of workshops sponsored by NREL/DOE under the general subject of photovoltaic testing and reliability during the period 1986--1993. PV performance and PV reliability are at least as important as PV cost, if not more. In the US, PV manufacturers, DOE laboratories, electric utilities, and others are engaged in the photovoltaic reliability research and testing. This group of researchers and others interested in the field were brought together to exchange the technical knowledge and field experience as related to current information in this evolving field of PV reliability. The papers presented here reflect this effort since the last workshop held in September, 1992. The topics covered include: cell and module characterization, module and system testing, durability and reliability, system field experience, and standards and codes.

Mrig, L. [ed.

1993-12-01T23:59:59.000Z

232

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

233

Energy-Efficient Broadcast and Multicast Trees for Reliable Wireless Communication Suman Banerjee, Archan Misra, Jihwang Yeo, Ashok Agrawala  

E-Print Network [OSTI]

1 Energy-Efficient Broadcast and Multicast Trees for Reliable Wireless Communication Suman Banerjee the transmission range. The problem of determining minimum aggregate transmission energy trees is known to be NP-Hard for the broadcast case [5]. Compu- tation of similar minimum energy multicast trees in wired en- vironments

Banerjee, Suman

234

Low Frequency Transmission Final Project Report  

E-Print Network [OSTI]

to HVDC transmission and conventional AC transmission in different configurations. The issue is quite

235

Borehole data transmission apparatus  

DOE Patents [OSTI]

A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

1993-01-01T23:59:59.000Z

236

Autonomous data transmission apparatus  

DOE Patents [OSTI]

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

237

Autonomous data transmission apparatus  

DOE Patents [OSTI]

A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

Kotlyar, O.M.

1997-03-25T23:59:59.000Z

238

Omega Transmission Lines  

E-Print Network [OSTI]

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

239

Borehole data transmission apparatus  

DOE Patents [OSTI]

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

240

Demand responsive programs - an emerging resource for competitive electricity markets?  

SciTech Connect (OSTI)

The restructuring of regional electricity markets in the U.S. has been accompanied by numerous problems, including generation capacity shortages, transmission congestion, wholesale price volatility, and reduced system reliability. These problems have created significant new opportunities for technologies and business approaches that allow load serving entities and other aggregators, to control and manage the load patterns of their wholesale or retail end-users. These technologies and business approaches for manipulating end-user load shapes are known as Load Management or, more recently, Demand Responsive programs. Lawrence Berkeley National Laboratory (LBNL) is conducting case studies on innovative demand responsive programs and presents preliminary results for five case studies in this paper. These case studies illustrate the diversity of market participants and range of technologies and business approaches and focus on key program elements such as target markets, market segmentation and participation results; pricing scheme; dispatch and coordination; measurement, verification, and settlement; and operational results where available.

Heffner, Grayson C. Dr.; Goldman, Charles A.

2001-06-25T23:59:59.000Z

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Photovoltaics performance and reliability workshop  

SciTech Connect (OSTI)

This document consists of papers and viewgraphs compiled from the proceedings of a workshop held in September 1992. This workshop was the fifth in a series sponsored by NREL/DOE under the general subject areas of photovoltaic module testing and reliability. PV manufacturers, DOE laboratories, electric utilities and others exchanged technical knowledge and field experience. The topics of cell and module characterization, module and system performance, materials and module durability/reliability research, solar radiation, and applications are discussed.

Mrig, L. [ed.] [ed.

1992-11-01T23:59:59.000Z

242

Photovoltaics performance and reliability workshop  

SciTech Connect (OSTI)

This document consists of papers and viewgraphs compiled from the proceedings of a workshop held in September 1992. This workshop was the fifth in a series sponsored by NREL/DOE under the general subject areas of photovoltaic module testing and reliability. PV manufacturers, DOE laboratories, electric utilities and others exchanged technical knowledge and field experience. The topics of cell and module characterization, module and system performance, materials and module durability/reliability research, solar radiation, and applications are discussed.

Mrig, L. (ed.) [ed.

1992-01-01T23:59:59.000Z

243

Reliability Assessment Using Discriminative Sampling and Metamodeling  

E-Print Network [OSTI]

1 05M-400 Reliability Assessment Using Discriminative Sampling and Metamodeling G. Gary Wang Dept ABSTRACT Reliability assessment is the foundation for reliability engineering and reliability-based design optimization. It has been a difficult task, however, to perform both accurate and efficient reliability

Wang, Gaofeng Gary

244

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

245

Patterns of Transmission Investment  

E-Print Network [OSTI]

long term performance contracts with a developer of an HVDC transmission link to expand “interconnection” capacity between TSOs with no or limited interconnections and with large sustained differences in prices. Merchant investments supported... truly separate AC networks. For example, by building HVDC inter-connectors between two separate networks, opportunities to increase trades of power from high price to low priced areas can be exploited. The HVDC link between the England and France...

Joskow, Paul

2006-03-14T23:59:59.000Z

246

DOE Transmission Workshop  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Deliciouscritical_materials_workshop_presentations.pdf MoreProgramofContract at itsSelections for ReducingTransmission

247

Geothermal Resources and Transmission Planning  

Broader source: Energy.gov [DOE]

This project addresses transmission-related barriers to utility-scale deployment of geothermal electric generation technologies.

248

Boardman to Hemingway Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

249

Transmission Issues Policy Steering Committee  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business Practices CommitteesTeams Joint Operating Committee Transmission Issues Policy Steering Committee Customer Training Interconnection Notices Rates Standards of...

250

Reliability guarantees, demonstration, and control for weapon systems proposals  

E-Print Network [OSTI]

Analyses ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 6 '?warhead i:ffectivenese ~ ~ , . . . . . . . ~ . ? . . ? ? ~ 12 guarantees ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 15 Demonstration . . . ~ . . . . . . . ~ . . . . . . ~ ~ 17 fceliability Gontrol Program...FS %umber Title Page 1 Warhead Lethality . . . . . . . . . . . . . . . . 14 3'ffeotivensss Growth Curve . . . . . , . . . . . 16 TyPical Sequential SamPling Plan . . . . . . . . 19 Punctional Reliability Diagram ~ . . . . . , . . 22 Continuous...

Lanier, Ross Edwin

1959-01-01T23:59:59.000Z

251

10-Yr. Transmission Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNGExperience hands-on halloweenReliable solar:2 OF

252

Application of reliability analysis method to fusion component testing  

SciTech Connect (OSTI)

The term reliability here implies that a component satisfies a set of performance criteria while under specified conditions of use over a specified period of time. For fusion nuclear technology, the reliability goal to be pursued is the development of a mean time between failures (MTBF) for a component which is longer than its lifetime goal. While the component lifetime is mainly determined by the fluence limitation (i.e., damage level) which leads to performance degradation or failure, the MTBF represents an arithmetic average life of all units in a population. One method of assessing the reliability goal involves determining component availability needs to meet the goal plant availability, defining a test-analyze-fix development program to improve component reliability, and quantifying both test times and the number of test articles that would be required to ensure that a specified target MTBF is met. Statistically, constant failure rates and exponential life distributions are assumed for analyses and blanket component development is used as an example. However, as data are collected the probability distribution of the parameter of interest can be updated in a Bayesian fashion. The nuclear component testing program will be structured such that reliability requirements for DEMO can be achieved. The program shall not exclude the practice of a good design (such as reducing the complexity of the system to the minimum essential for the required operation), the execution of high quality manufacturing and inspection processes, and the implication of quality assurance and control for component development. In fact, the assurance of a high quality testing/development program is essential so that there is no question left for reliability.

Ying, A.Y.; Abdou, M.A. [Univ. of California, Los Angeles, CA (United States)

1994-12-31T23:59:59.000Z

253

Assessing reliability in energy supply systems  

E-Print Network [OSTI]

R.N. , 1984. Power-system reliability in perspective, in:L. (Eds. ), 1991. Applied Reliability Assessment in ElectricR. , Allan, R.N. , 1996. Reliability Evaluation of Power

McCarthy, Ryan W.; Ogden, Joan M.; Sperling, Daniel

2007-01-01T23:59:59.000Z

254

Reliability Assessment Incorporating Operational Considerations and Economic  

E-Print Network [OSTI]

PSERC Reliability Assessment Incorporating Operational Considerations and Economic Aspects Engineering Research Center Reliability Assessment Incorporating Operational Considerations and Economic Center (PSERC) research project titled "Reliability Assessment Incorporating Operational Considerations

255

Assessing Reliability in Energy Supply Systems  

E-Print Network [OSTI]

R.N. , 1984. Power-system reliability in perspective, in:L. (Eds. ), 1991. Applied Reliability Assessment in ElectricR. , Allan, R.N. , 1996. Reliability Evaluation of Power

McCarthy, Ryan; Ogden, Joan M.; Sperling, Dan

2008-01-01T23:59:59.000Z

256

Arnold Schwarzenegger REAL-TIME GRID RELIABILITY  

E-Print Network [OSTI]

Arnold Schwarzenegger Governor REAL-TIME GRID RELIABILITY MANAGEMENT California ISO Real Laboratory Consortium for Electric Reliability Technology Solutions APPENDIXC October 2008 CEC-500 (VSA) prototype to monitor system voltage conditions and provide real time dispatchers with reliability

257

Constructing Reliable Distributed Communication Systems with CORBA  

E-Print Network [OSTI]

Constructing Reliable Distributed Communication Systems with CORBA Silvano Maffeis Douglas C model to support reliable data- and process- oriented distributed systems that communicate through syn distributed object computing systems with CORBA. First, we examine the question of whether reliable applica

Schmidt, Douglas C.

258

NREL's Gearbox Reliability Collaborative leads to wind turbine gearbox reliability, lowering the cost of energy.  

E-Print Network [OSTI]

NREL's Gearbox Reliability Collaborative leads to wind turbine gearbox reliability, lowering operations. In 2007, the National Renewable Energy Laboratory (NREL) initi- ated the Gearbox Reliability that contribute to reduced gearbox reliability. In contrast to private investigations of these problems, GRC

259

Applicative Notions in ML-like Programs   

E-Print Network [OSTI]

Pure functional languages are expressive tools for writing modular and reliable code. State in programming languages is a useful tool for programming dynamic systems. However, their combination yields programming languages that are difficult...

Ling, Budi H

260

Recommendations to Address Power Reliability Concerns Raised...  

Broader source: Energy.gov (indexed) [DOE]

to Address Power Reliability Concerns Raised as a Result of Pending Environmental Regulations for Electric Generation Stations Recommendations to Address Power Reliability Concerns...

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Comments of North American Electric Reliability Corporation ...  

Broader source: Energy.gov (indexed) [DOE]

North American Electric Reliability Corporation (NERC) to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Comments of North American Electric Reliability...

262

NREL Publishes Gearbox Reliability Collaborative Findings Report...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

NREL Publishes Gearbox Reliability Collaborative Findings Report NREL Publishes Gearbox Reliability Collaborative Findings Report October 3, 2011 - 12:56pm Addthis This is an...

263

Sandia National Laboratories: Third Annual Continuous Reliability...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ClimateECEnergyThird Annual Continuous Reliability Enhancement for Wind (CREW) Database Report Now Available Third Annual Continuous Reliability Enhancement for Wind (CREW)...

264

Funding Opportunity Announcement: PHYSICS OF RELIABILITY: EVALUATING...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

PHYSICS OF RELIABILITY: EVALUATING DESIGN INSIGHTS FOR COMPONENT TECHNOLOGIES IN SOLAR 2 (PREDICTS 2) Funding Opportunity Announcement: PHYSICS OF RELIABILITY: EVALUATING DESIGN...

265

Smart Grid Investments Improve Grid Reliability, Resilience,...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Investments Improve Grid Reliability, Resilience, and Storm Responses (November 2014) Smart Grid Investments Improve Grid Reliability, Resilience, and Storm Responses (November...

266

Information Concerning Reliability Impacts under Various System...  

Broader source: Energy.gov (indexed) [DOE]

Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Information Concerning Reliability Impacts under Various System Configurations...

267

Thermoelectric Materials By Design: Mechanical Reliability (Agreement...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

By Design: Mechanical Reliability (Agreement 14957) Thermoelectric Materials By Design: Mechanical Reliability (Agreement 14957) Presentation from the U.S. DOE Office of Vehicle...

268

Distributed Generation Operational Reliability and Availability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Reliability and Availability Database, Final Report, January 2004 Distributed Generation Operational Reliability and Availability Database, Final Report, January 2004 This final...

269

Electricity & Energy Reliability (WFP) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Electricity & Energy Reliability (WFP) Electricity & Energy Reliability (WFP) The purpose of the workforce Plan is to provide focus and direction to Human Resources (HR) strategy....

270

Automated manual transmission clutch controller  

DOE Patents [OSTI]

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

1999-11-30T23:59:59.000Z

271

Transmission - Contact Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler TinaContact-Information-Transmission Sign In About |

272

Transmission Capacity Forum  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler TinaContact-Information-Transmission Sign In About

273

Transmission Contact Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler TinaContact-Information-Transmission Sign In

274

Transmission Developers Inc.  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for' % ~ Transmission

275

Transmission and Storage Operations  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for' %Transmission and

276

Transmission Right Of Way  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layered NbS2Topo II: AnTraining andfordefault SignTransmissionAbout

277

Puget Sound Area Electric Reliability Plan : Final Environmental Impact Statement.  

SciTech Connect (OSTI)

A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, and during certain conditions, there is more demand for power in the Puget Sound area than the transmission system and existing generation can reliably supply. This high demand, called peak demand occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

278

Abstract --Under a context of transmission open access, a methodology to define a common transmission trunk system  

E-Print Network [OSTI]

Terms--Transmission systems, Transmission pricing, Cooperative games, Shapley value, Transmission open

Catholic University of Chile (Universidad CatĂłlica de Chile)

279

Structural Reliability of Ceramics at High Temperature: Mechanisms of Fracture and Fatigue Crack Growth  

SciTech Connect (OSTI)

Final report of our DOE funded research program. Aim of the research program was to provide a fundamental basis from which the mechanical reliability of layered structures may be understood, and to provide guidelines for the development of technologically relevant layered material structures with optimum resistance to fracture and subcritical debonding. Progress in the program to achieve these goals is described.

Reinhold H. Dauskardt

2005-08-01T23:59:59.000Z

280

Colorado Electrical Transmission Grid  

SciTech Connect (OSTI)

Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Xcel Energy Publication Date: 2012 Title: Colorado XcelEnergy NonXcel Transmission Network Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains transmission network of Colorado Spatial Domain: Extent: Top: 4540689.017558 m Left: 160606.141934 m Right: 758715.946645 m Bottom: 4098910.893397m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shapefile

Zehner, Richard E.

2012-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

TRAVEL DEMAND AND RELIABLE FORECASTS  

E-Print Network [OSTI]

TRAVEL DEMAND AND RELIABLE FORECASTS FOR TRANSIT MARK FILIPI, AICP PTP 23rd Annual Transportation transportation projects § Develop and maintain Regional Travel Demand Model § Develop forecast socio in cooperative review during all phases of travel demand forecasting 4 #12;Cooperative Review Should Include

Minnesota, University of

282

Conductive Channel for Energy Transmission  

SciTech Connect (OSTI)

For many years the attempts to create conductive channels of big length were taken in order to study the upper atmosphere and to settle special tasks, related to energy transmission. There upon the program of creation of 'Impulsar' represents a great interest, as this program in a combination with high-voltage high repetition rate electrical source can be useful to solve the above mentioned problems (N. Tesla ideas for the days of high power lasers). The principle of conductive channel production can be shortly described as follows. The 'Impulsar' - laser jet engine vehicle - propulsion take place under the influence of powerful high repetition rate pulse-periodic laser radiation. In the experiments the CO{sub 2}-laser and solid state Nd:YAG laser systems had been used. Active impulse appears thanks to air breakdown (<30 km) or to the breakdown of ablated material on the board (>30 km), placed in the vicinity of the focusing mirror-acceptor of the breakdown waves. With each pulse of powerful laser the device rises up, leaving a bright and dense trace of products with high degree of ionization and metallization by conductive nano-particles due to ablation. Conductive dust plasma properties investigation in our experiments was produced by two very effective approaches: high power laser controlled ablation and by explosion of wire. Experimental and theoretical results of conductive canal modeling will be presented. The estimations show that with already experimentally demonstrated figures of specific thrust impulse the lower layers of the Ionosphere can be reached in several ten seconds that is enough to keep the high level of channel conductivity and stability with the help of high repetition rate high voltage generator. Some possible applications for new technology are highlighted.

Apollonov, Victor V. [A.M. Prokhorov General Physics Institute, Vavilov Str. 38, Moscow, 119991 (Russian Federation)

2011-11-10T23:59:59.000Z

283

Ris-M-2584 RELIABILITY CALCULATIONS  

E-Print Network [OSTI]

Risø-M-2584 RELIABILITY CALCULATIONS Improvements of methods intended for calculation of reliability of structures and systems Kurt E. Petersen Abstract. Risk and reliability analysis is increasingly being used in evaluations of plant safety and plant reliability. The analysis can be performed either

284

Reliability Failure Mode, Effects, and Criticality Analysis  

E-Print Network [OSTI]

Reliability Failure Mode, Effects, and Criticality Analysis Addendum 1; HFE ~ ATM501 PAGE I I. Hiebert Reliability Engineer HFE · B-1 f #12;~~.~-~ -_ ~ ~ Reliability Failure Mode, Effects were slight adjustment in the linearizing resistors. The reliability is effected upward by the deletion

Rathbun, Julie A.

285

The design of a reliable reputation system  

E-Print Network [OSTI]

reliability by spreading its transactions evenly across all 20 peers in the system (shown by Distribution

Swamynathan, Gayatri; Almeroth, Kevin C.; Zhao, Ben Y.

2010-01-01T23:59:59.000Z

286

Technical information report: Plasma melter operation, reliability, and maintenance analysis  

SciTech Connect (OSTI)

This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

Hendrickson, D.W. [ed.

1995-03-14T23:59:59.000Z

287

STATE RESEARCH, OUTREACH AND TECHNICAL ASSISTANCE TO IMPROVE THE NATION’S TRANSMISSION AND DISTRIBUTION SYSTEMS  

SciTech Connect (OSTI)

The goal of the project 'State Research, Outreach and Technical Assistance to Improve the Nation's Transmission and Distribution Systems' was for the National Association of State Energy Officials (NASEO) to partner with the National Governors Association (NGA) Center for Best Practices, the National Conference of State Legislators (NCSL), and the National Association of Regulatory Utility Commissioners (NARUC) to assist DOE's Office of Electricity Delivery and Energy Reliability (OE) in its effort to modernize and expand America's electric delivery system. NASEO focused on key transmission and distribution issues where coordination between the federal and state governments was critical. Throughout the duration of this program, NASEO engaged in monthly coordination - occasionally more often - with NGA, NCSL and NARUC. NASEO staff and General Counsel Jeff Genzer also had regular face-to-face meetings, phone calls and emails with OE staff to learn from DOE and share information and feedback from the state energy offices on transmission and distribution. To commence work on this project, NASEO met with OE, NGA, NCSL and NARUC in January 2005 and remained committed to regular communications with all involved entities throughout the duration of this project. NASEO provided comments and analysis to the other partners on deliverable reports under this award. This award provided support to NASEO's Energy Production Committee (chaired by Dub Taylor of Texas, followed by Tom Fuller of Wyoming) to plan and host sessions at NASEO's Annual Meeting and Energy Outlook Conferences. Sessions included presentations from state, DOE, national laboratory and private sector experts on transmission, distribution, distributed energy resources, integrating renewable resources into the electricity grid. NASEO disseminated information to its members through emails and its website on transmission and distribution technology and policy. NASEO was an active member of the National Council on Electricity Policy as part of its transmission and distribution work. The National Council on Electricity Policy (National Council) is a venture between NASEO, NARUC, NCSL, National Association of Clean Air Agencies (NACAA) and the National Governors Association (NGA). The National Council also includes several federal members including FERC, DOE, and the U.S. Environment Protection Agency (EPA). NASEO members serve on the policy committee and NASEO General Council Jeff Genzer is a member of the National Council's Executive Committee. NASEO staff participated on regularly scheduled policy committee and executive committee calls and helped to plan agendas and publications for various state decision-makers. Specifically, NASEO organized state energy officials and participating in formulating the agenda for meetings, including the Mid-Atlantic Distributed Generation Workshop in New Jersey in September 2007. NASEO shared the results of these meetings through its website, email communications and direct conversations with state energy officials. NASEO participated as a member of the National Action Plan for Energy Efficiency (NAPEE) Leadership Committee, representing the interests and expertise of the state energy offices. In addition, NASEO was part of the Long-Term Vision Committee. NASEO members also participated in these activities and NASEO has encouraged further efforts of its membership with regards to NAPEE. NASEO has worked to ensure that its membership has the most timely and accurate information about transmission and distribution technology and policy. Its work with other associations has facilitated greater partnerships to enhance activities across the nation and encourage state energy offices to collaborate with public utility commissions, legislatures and executives to improve modern transmission and distribution. NASEO has identified transmission and distribution as a key area for further action.

David Terry; Ben Deitchman; Shemika Spencer

2009-06-29T23:59:59.000Z

288

NREL: Performance and Reliability R&D - Photovoltaic Reliability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions and AchievementsResearchReliability Workshops

289

Program Development  

SciTech Connect (OSTI)

This presentation covers how to go about developing a human reliability program. In particular, it touches on conceptual thinking, raising awareness in an organization, the actions that go into developing a plan. It emphasizes evaluating all positions, eliminating positions from the pool due to mitigating factors, and keeping the process transparent. It lists components of the process and objectives in process development. It also touches on the role of leadership and the necessity for audit.

Atencio, Julian J.

2014-05-01T23:59:59.000Z

290

Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar  

Broader source: Energy.gov [DOE]

The SunShot Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar (PREDICTS) program is taking a physics- and chemistry-based approach to identifying failure modes...

291

Review of Quantitative Software Reliability Methods  

SciTech Connect (OSTI)

The current U.S. Nuclear Regulatory Commission (NRC) licensing process for digital systems rests on deterministic engineering criteria. In its 1995 probabilistic risk assessment (PRA) policy statement, the Commission encouraged the use of PRA technology in all regulatory matters to the extent supported by the state-of-the-art in PRA methods and data. Although many activities have been completed in the area of risk-informed regulation, the risk-informed analysis process for digital systems has not yet been satisfactorily developed. Since digital instrumentation and control (I&C) systems are expected to play an increasingly important role in nuclear power plant (NPP) safety, the NRC established a digital system research plan that defines a coherent set of research programs to support its regulatory needs. One of the research programs included in the NRC's digital system research plan addresses risk assessment methods and data for digital systems. Digital I&C systems have some unique characteristics, such as using software, and may have different failure causes and/or modes than analog I&C systems; hence, their incorporation into NPP PRAs entails special challenges. The objective of the NRC's digital system risk research is to identify and develop methods, analytical tools, and regulatory guidance for (1) including models of digital systems into NPP PRAs, and (2) using information on the risks of digital systems to support the NRC's risk-informed licensing and oversight activities. For several years, Brookhaven National Laboratory (BNL) has worked on NRC projects to investigate methods and tools for the probabilistic modeling of digital systems, as documented mainly in NUREG/CR-6962 and NUREG/CR-6997. However, the scope of this research principally focused on hardware failures, with limited reviews of software failure experience and software reliability methods. NRC also sponsored research at the Ohio State University investigating the modeling of digital systems using dynamic PRA methods. These efforts, documented in NUREG/CR-6901, NUREG/CR-6942, and NUREG/CR-6985, included a functional representation of the system's software but did not explicitly address failure modes caused by software defects or by inadequate design requirements. An important identified research need is to establish a commonly accepted basis for incorporating the behavior of software into digital I&C system reliability models for use in PRAs. To address this need, BNL is exploring the inclusion of software failures into the reliability models of digital I&C systems, such that their contribution to the risk of the associated NPP can be assessed.

Chu, T.L.; Yue, M.; Martinez-Guridi, M.; Lehner, J.

2010-09-17T23:59:59.000Z

292

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION  

Broader source: Energy.gov [DOE]

The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

293

Gearbox Reliability Collaborative Bearing Calibration  

SciTech Connect (OSTI)

NREL has initiated the Gearbox Reliability Collaborative (GRC) to investigate the root cause of the low wind turbine gearbox reliability. The GRC follows a multi-pronged approach based on a collaborative of manufacturers, owners, researchers and consultants. The project combines analysis, field testing, dynamometer testing, condition monitoring, and the development and population of a gearbox failure database. At the core of the project are two 750kW gearboxes that have been redesigned and rebuilt so that they are representative of the multi-megawatt gearbox topology currently used in the industry. These gearboxes are heavily instrumented and are tested in the field and on the dynamometer. This report discusses the bearing calibrations of the gearboxes.

van Dam, J.

2011-10-01T23:59:59.000Z

294

Direct current power transmission systems  

SciTech Connect (OSTI)

This book represents text on HVDC transmission available. It deals with the various aspects of the state of the art in HVDC transmission technology. This book presents many aspects of interactions of AC/DC systems. Modeling and analysis of DC systems are also discussed in detail.

Padiyar, K.R.

1991-01-01T23:59:59.000Z

295

HVDC power transmission technology assessment  

SciTech Connect (OSTI)

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

296

The Materials Reliability Division has established several capabilities for analyzing the reliability of  

E-Print Network [OSTI]

The Materials Reliability Division has established several capabilities for analyzing the reliability of small scale structures, including a number of custom instruments developed specifically@boulder.nist.gov FACILITIES Measurement Facilities: Small-Scale Mechanical Reliability Materials Science and Engineering

297

Microgrids and Heterogeneous Security, Quality, Reliability, and Availability  

E-Print Network [OSTI]

and Energy Reliability, Distribution System Integrationand Energy Reliability, Distribution System Integration

Marnay, Chris

2007-01-01T23:59:59.000Z

298

Key-shift transmission  

SciTech Connect (OSTI)

A key-shift transmission is described, characterized by the speed-change shaft being divided into a pair of trough-shaped shaft halves each having an arched inner surface which defines a part of a cylindrical bore extending axially through the speed-change shaft thereby the shaft being formed into a hollow shaft, and by each of the shaft halves including a pair of flattened end surfaces which extend axially of each shaft half at both sides of the inner surface, one of the end surfaces having thereon an axially elongated projection and the other of the end surfaces having herein an axially elongated recess of a depth smaller than the height of the projection. The pair of shaft halves are engaged to each other co-rotatably by fitting the projections of the respective shaft halves into the recesses of the respective shaft halves so as to form in an outer surface of the speed-change shaft a pair of elongated axial grooves which are located radially outwardly of the elongated projections of the respective shaft halves and between the flattened end surfaces of the respective shaft halves. A pair of the shift keys are disposed within the pair of elongated axial grooves.

Nemoto, S.

1989-03-07T23:59:59.000Z

299

Great Plains Wind Energy Transmission Development Project  

SciTech Connect (OSTI)

In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

2012-06-09T23:59:59.000Z

300

Reliable renewable energy for a new electric infrastructure.  

SciTech Connect (OSTI)

This is workshop is about methodologies, tools, techniques, models, training, codes and standards, etc., that can improve reliability of systems while reducing costs. We've intentionally scaled back on presentation time to allow more time for interaction. Sandia's PV Program Vision - Recognition as a world-class facility to develop and integrate new photovoltaic components, systems, and architectures for the future of our electric/energy delivery systems.

Hanley, Charles J.

2010-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Sandia National Laboratories: Inverter Reliability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLS Exhibit atVehicleEnergyPolydotsMicroReliability 2013

302

Probabilistic fatigue methodology and wind turbine reliability  

SciTech Connect (OSTI)

Wind turbines subjected to highly irregular loadings due to wind, gravity, and gyroscopic effects are especially vulnerable to fatigue damage. The objective of this study is to develop and illustrate methods for the probabilistic analysis and design of fatigue-sensitive wind turbine components. A computer program (CYCLES) that estimates fatigue reliability of structural and mechanical components has been developed. A FORM/SORM analysis is used to compute failure probabilities and importance factors of the random variables. The limit state equation includes uncertainty in environmental loading, gross structural response, and local fatigue properties. Several techniques are shown to better study fatigue loads data. Common one-parameter models, such as the Rayleigh and exponential models are shown to produce dramatically different estimates of load distributions and fatigue damage. Improved fits may be achieved with the two-parameter Weibull model. High b values require better modeling of relatively large stress ranges; this is effectively done by matching at least two moments (Weibull) and better by matching still higher moments. For this purpose, a new, four-moment {open_quotes}generalized Weibull{close_quotes} model is introduced. Load and resistance factor design (LRFD) methodology for design against fatigue is proposed and demonstrated using data from two horizontal-axis wind turbines. To estimate fatigue damage, wind turbine blade loads have been represented by their first three statistical moments across a range of wind conditions. Based on the moments {mu}{sub 1}{hor_ellipsis}{mu}{sub 3}, new {open_quotes}quadratic Weibull{close_quotes} load distribution models are introduced. The fatigue reliability is found to be notably affected by the choice of load distribution model.

Lange, C.H. [Stanford Univ., CA (United States)

1996-05-01T23:59:59.000Z

303

Reliability Analysis of Electric Power Systems Using an Object-oriented Hybrid Modeling Approach  

E-Print Network [OSTI]

The ongoing evolution of the electric power systems brings about the need to cope with increasingly complex interactions of technical components and relevant actors. In order to integrate a more comprehensive spectrum of different aspects into a probabilistic reliability assessment and to include time-dependent effects, this paper proposes an object-oriented hybrid approach combining agent-based modeling techniques with classical methods such as Monte Carlo simulation. Objects represent both technical components such as generators and transmission lines and non-technical components such as grid operators. The approach allows the calculation of conventional reliability indices and the estimation of blackout frequencies. Furthermore, the influence of the time needed to remove line overloads on the overall system reliability can be assessed. The applicability of the approach is demonstrated by performing simulations on the IEEE Reliability Test System 1996 and on a model of the Swiss high-voltage grid.

Schläpfer, Markus; Kröger, Wolfgang

2012-01-01T23:59:59.000Z

304

Reliability Challenges for Solar Energy (Presentation)  

SciTech Connect (OSTI)

Presentation that reviews reliability issues related to various types of photovoltaic tecnnologies, including crystalline silicon, thin films, and concentrating PV.

Kurtz, S.

2009-12-08T23:59:59.000Z

305

LUNAR MASS SPECTROMETER RELIABILITY LOGIC DIAGRAM  

E-Print Network [OSTI]

point (A) to (F). The block diagram also defines the reliability functions for the purpose of FMEA 1

Rathbun, Julie A.

306

PV Module Reliability R&D Project Overview  

SciTech Connect (OSTI)

The DOE Solar Energy Technologies Program includes a sub-key activity entitled ''Photovoltaic Module Reliability R&D''. This activity has been in existence for several years to help ensure that the PV technologies that advance to the commercial module stage have acceptable service lifetimes and annual performance degradation rates. The long-term (2020) goal, as stated in the Solar Program Multi-Year Technical Plan [1], is to assist industry with the development of PV systems that have 30-year service lifetimes and 1% annual performance degradation rates. The corresponding module service lifetimes and annual performance degradation rate would have to be 30 years lifetime and approximately 0.5% (or less, depending on the type of PV system) annual performance degradation. Reaching this goal is critical to achieving the PV technology Levelized Energy Cost Targets, as listed and described in the Solar Program Multi-Year Technical Plan. This paper is an overview of the Module Reliability R&D sub-key activity. More details and the major results and accomplishments are covered in the papers presented in the PV Module Reliability Session of the DOE Solar Energy Technology Review Meeting, October 25-28, 2004, in Denver, Colorado.

Hulstrom, R. L.

2005-01-01T23:59:59.000Z

307

Electric Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement Tuesday,DepartmentTheandElectric

308

SOFTWARE RELIABILITY SIMULATION Robert C. Tausworthe  

E-Print Network [OSTI]

CHAPTER 16 SOFTWARE RELIABILITY SIMULATION Robert C. Tausworthe Jet Propulsion Laboratory, together with their attributes and interrelationships, that are related to reliability 1 comprise what we here refer to as the reliability process. The artifacts of the software life cycle include doc­ uments

Lyu, Michael R.

309

Arnold Schwarzenegger REAL-TIME GRID RELIABILITY  

E-Print Network [OSTI]

Arnold Schwarzenegger Governor REAL-TIME GRID RELIABILITY MANAGEMENT Scoping Study Report Reliability Technology Solutions APPENDIXG October 2008 CEC-500-2008-049-APG #12;#12;Prepared By: Lawrence for Electric Reliability Technology Solutions and was funded by the California Energy Commission's Public

310

Network Reliability: Models, Measures and Analysis  

E-Print Network [OSTI]

Network Reliability: Models, Measures and Analysis #3; L.Jereb Department of Telecommunications y quality services when the network elements apt to random failures. Several network reliability models have of network reliability analysis and summarizes the critical issues. A possible solution taking into account

László, Jereb

311

Dispatcher Reliability Analysis : SPICA-RAIL Experiments  

E-Print Network [OSTI]

Dispatcher Reliability Analysis : SPICA-RAIL Experiments Fabien Belmonte, Jean-Louis Boulanger of scenarios and evaluate the behaviour of human operators. A state of the art in human reliability is pre coupled to a traffic simulator. It allows to gather data for human reliability evaluation and man

Paris-Sud XI, Université de

312

RELIABILITY-BASED CASTING PROCESS DESIGN OPTIMIZATION  

E-Print Network [OSTI]

RELIABILITY-BASED CASTING PROCESS DESIGN OPTIMIZATION Richard Hardin1 , K.K. Choi1 , and Christoph 52242-1527 Keywords: Casting Process Design, Optimization, Reliability-Based Design Optimization purpose reliability-based design optimization (RBDO) software tool previously developed at the University

Beckermann, Christoph

313

Reliability Prediction -Array D Redundant Command Receiver  

E-Print Network [OSTI]

Reliability Prediction - Array D Redundant Command Receiver ATM 981 I PAGI 1 OP 16 DATE 26 Feb. 1971 This Reliability Prediction was prepared by Motorola's Government Electronics Division as required combiner· .. There was a reliability design goal of · 998 for a two-year mission on the ... lunar surface

Rathbun, Julie A.

314

Arnold Schwarzenegger REAL-TIME GRID RELIABILITY  

E-Print Network [OSTI]

Arnold Schwarzenegger Governor REAL-TIME GRID RELIABILITY MANAGEMENT Prototype Phasor-Based Real Reliability Technology Solutions APPENDIXE October 2008 CEC-500-2008-049-APE #12;#12;Prepared By: Lawrence in this report. #12;Slide 0 Consortium for Electric Reliability Technology Solutions Real-Time Dynamics

315

Reliability Analysis of Microelectronic Components and Materials  

E-Print Network [OSTI]

1 Reliability Analysis of Microelectronic Components and Materials Increasing numbers of the degradation processes relevant to soldered joints is crucial for more reliable life-cycle predictions. Joining methods are critical for the reliable use of electronic packages. In particular, since the advent

Berlin,Technische Universität

316

Transductive Reliability Estimation for Kernel Based Classifiers  

E-Print Network [OSTI]

Transductive Reliability Estimation for Kernel Based Classifiers Dimitris Tzikas1 , Matjaz Kukar2@cs.uoi.gr Abstract. Estimating the reliability of individual classifications is very important in several applications such as medical diagnosis. Recently, the transductive approach to reliability estimation has been

Likas, Aristidis

317

Reliability Meets Big Data: Opportunities and Challenges  

E-Print Network [OSTI]

Reliability Meets Big Data: Opportunities and Challenges William Q. Meeker Department of Statistics, 2013 Abstract Reliability field data such as that obtained from warranty claims and maintenance records products, the nature of field reliability data is changing dramatically. In particular, products can

318

RELIABILITY IN PERSONAL POSITIONING Heidi Kuusniemi1*  

E-Print Network [OSTI]

RELIABILITY IN PERSONAL POSITIONING Heidi Kuusniemi1* , GĂ©rard Lachapelle2 , Jarmo Takala1 1 interference effects lead to measurement errors, and reliability monitoring in terms of proper fault detection in future new possibilities to provide integrity and reliability information to the user both at signal

Calgary, University of

319

RELIABILITY ENGINEERING: OLD PROBLEMS AND NEW CHALLENGES  

E-Print Network [OSTI]

1 RELIABILITY ENGINEERING: OLD PROBLEMS AND NEW CHALLENGES E. Zio Dept. of Energy, Polytechnic: enrico.zio@polimi.it Abstract The first recorded usage of the word reliability dates back to the 1800s, albeit referred to a person and not a technical system. Since then, the concept of reliability has become

Paris-Sud XI, Université de

320

The Whereabouts of Reliability Education: Challenges & Opportunities  

E-Print Network [OSTI]

. There is a gap between reliability theory and practice, between school and industry, book knowledge and real The probability that the system is still operating at time t. where f(t) probability density function h(t) failure changing and getting higher. #12;Some Reliability books in ... 1960s Igor Bazovsky (1961), Reliability

Bernstein, Joseph B.

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

AC and DC power transmission  

SciTech Connect (OSTI)

The technical and economic assessment of AC and DC transmission systems; long distance transmission, cable transmission, system inter-connection, voltage support, reactive compensation, stabilisation of systems; parallel operation of DC links with AC systems; comparison between alternatives for particular schemes. Design and application equipment: design, testing and application of equipment for HVDC, series and shunt static compensated AC schemes, including associated controls. Installations: overall design of stations and conductor arrangements for HVDC, series and shunt static AC schemes including insulation co-ordination. System analysis and modelling.

Not Available

1985-01-01T23:59:59.000Z

322

Electrical transmission line diametrical retainer  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

323

Midwest Transmission Workshop I Summary  

SciTech Connect (OSTI)

OAK-B135 The meeting was opened with a review of the purposes of the workshop: (1) Present and discuss key studies and assessments of transmission upgrades, additions and related issues for the upper Midwest, including work that addresses the full range of views on these topics; (2) Understand the various transmission issues in the upper Midwest and discuss options for addressing the issues; and (3) Identify the decision makers and entities that need to play an active role if transmission issues are to be resolved, and agree on next steps for engaging these individuals and organizations through education, outreach, and information dissemination.

Kevin Bryan

2001-05-01T23:59:59.000Z

324

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

13 Table 6. 2006 Renewable Energy & Estimated Requirementsin 2020.   Table 4. Renewable Energy and Capacity—2006for transfer of renewable energy from the L.A.  Basin  Area 

Budhraja, Vikram

2008-01-01T23:59:59.000Z

325

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

all remote resource  (renewable and non?renewable) to the all remote resource  (renewable  and non?renewable) to the utilization of renewable  resources and meeting the RPS.  

Budhraja, Vikram

2008-01-01T23:59:59.000Z

326

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

operating attributes:  Load following.   Spinning and non?dispatchable, then load following, regulation, ramping regulation, ramping, load following, voltage support and 

Budhraja, Vikram

2008-01-01T23:59:59.000Z

327

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

3. Renewable Energy Production Required for Alternative RPS33 percent RPS by 2020, energy production from renewable such as their daily energy production profiles).  

Budhraja, Vikram

2008-01-01T23:59:59.000Z

328

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

12 Table 3. Renewable Energy Production Required forTable  Table 3. Renewable Energy Production Required forEnergy Consumption Renewable Energy Production B kWH Year In

Budhraja, Vikram

2008-01-01T23:59:59.000Z

329

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

The 20,000 MW of renewable resources to be developed will greater utilization of renewable  resources and meeting the of renewable resources. ..16 Table 8.

Budhraja, Vikram

2008-01-01T23:59:59.000Z

330

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

in 2020.   Table 4. Renewable Energy and Capacity—200612 Table 4. Renewable Energy and Capacity—2006 Recorded,In-State Renewable energy and capacity requirements for 20% 

Budhraja, Vikram

2008-01-01T23:59:59.000Z

331

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

Options on Renewables Integration ..28Issues and Action Items for Renewables Integration.additional energy from renewables will be  needed to meet 

Budhraja, Vikram

2008-01-01T23:59:59.000Z

332

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

Devers,  Antelope and Vincent; solar thermal at Lugo; and scale  development of wind, solar thermal, and geothermal within load centers.   Solar Thermal—7,000 MW total, with 

Budhraja, Vikram

2008-01-01T23:59:59.000Z

333

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

Map of Solar Resource Potential in California,  [http://maps/solar_potential.html].   California Energy Solar Thermal—Barstow, Mohave, and Central California  For 

Budhraja, Vikram

2008-01-01T23:59:59.000Z

334

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

production level from small hydro as recorded in 2006.  kWH Geothermal Biomass Small Hydro 830 est Wind Solar TotalRPS Geothermal Biomass Small Hydro 830 est Wind Solar Total

Budhraja, Vikram

2008-01-01T23:59:59.000Z

335

2013 Transmission Reliability R&D Peer Review Presentations Available |  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3 Beryllium-Associated Worker Registry Summary 2013Evaluation3 NCSAM2013Department

336

Transmission Reliability "Load as a Resource" Peer Review Materials Now  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for' % ~Available |

337

An environmental sample chamber for reliable scanning transmission x-ray  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone by E-mail ShareRed CrossAn Iridate withretention

338

Video transmission over wireless networks  

E-Print Network [OSTI]

Compressed video bitstream transmissions over wireless networks are addressed in this work. We first consider error control and power allocation for transmitting wireless video over CDMA networks in conjunction with multiuser detection. We map a...

Zhao, Shengjie

2005-08-29T23:59:59.000Z

339

EIS-0231: Navajo Transmission Project  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned...

340

The Economic Implications of Adding Wind Capacity to a Bulk Power Transmission Network  

E-Print Network [OSTI]

The Economic Implications of Adding Wind Capacity to a Bulk Power Transmission Network by Tim Mount, these are precisely the prices that must be determined correctly to measure the economic value of equipment the economic value of improved reliability. The objective of this paper is to extend the co

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EIS-0103: New England/Hydro-Quebec 450-kV Direct Current Transmission Line Interconnection  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration prepared this statement to evaluate the environmental impacts of the construction, maintenance and operation of a 57-mile transmission line from Monroe, New Hampshire, to the U.S./Canadian border for the purpose of economic exchange of power and increased reliability.

342

Browse > Journals> Smart Grid, IEEE Transactions ...> Top Accessed Articles 1. Smart Transmission Grid: Vision and Framework  

E-Print Network [OSTI]

Browse > Journals> Smart Grid, IEEE Transactions ...> Top Accessed Articles 1. Smart Transmission.2080328 3. A Reliability Perspective of the Smart Grid Moslehi, K. Kumar, R. Page(s): 57 - 64 Digital Object Consumption Scheduling for the Future Smart Grid Mohsenian-Rad, A. Wong, V.W.S. Jatskevich, J. Schober, R

Tennessee, University of

343

Fault Tolerant Control using Cartesian Genetic Programming  

E-Print Network [OSTI]

Fault Tolerant Control using Cartesian Genetic Programming Yoshikazu Hirayama University of York]: Robotics-- Sensors; F.2.2 [Analysis of Algorithms and Problem Complexity]: Nonnumerical Algorithms and Problems General Terms Algorithms, Reliability Keywords cartesian genetic programming, evolutionary

Fernandez, Thomas

344

Can Software Reliability Outperform Hardware Reliability in High-Performance Interconnects?  

E-Print Network [OSTI]

Can Software Reliability Outperform Hardware Reliability in High-Performance Interconnects? A Case, Myrinet, InfiniBand, and others HPC networks are generally quite reliable without additional protocols link With this in mind, how should reliability be implemented? 3 #12;Onload or Offload? Some networks

Panda, Dhabaleswar K.

345

Reliable computation of homogeneous azeotropes  

SciTech Connect (OSTI)

It is important to determine the existence and composition of homogeneous azeotropes in the analysis of phase behavior and in the synthesis and design of separation systems, from both theoretical and practical standpoints. A new method for reliably locating any and all homogeneous azeotropes for multicomponent mixtures is presented. The method also verifies the nonexistence of homogeneous azeotropes if none are present. The method is based on interval analysis, in particular an interval-Newton/generalized-bisection-algorithm providing a mathematical and computational guarantee that all azeotropes are located. This general-purpose technique can be applied in connection with any thermodynamic models. The technique is illustrated in several example problems using the Wilson, NRTL, and UNIQUAC activity-coefficient models.

Maier, R.W.; Brennecke, J.F.; Stadtherr, M.A. [Univ. of Notre Dame, IN (United States). Dept. of Chemical Engineering] [Univ. of Notre Dame, IN (United States). Dept. of Chemical Engineering

1998-08-01T23:59:59.000Z

346

WINDExchange Offshore Wind Webinar: Transmission Planning and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind WINDExchange Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind...

347

2006 National Electric Transmission Congestion Study Federal...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

348

National Electric Transmission Congestion Study | Department...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Study National Electric Transmission Congestion Study National Electric Transmission Congestion Study Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C....

349

2009 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

350

2006 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

351

National Electric Transmission Congestion Study Workshops | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study Workshops National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops to receive input...

352

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

353

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2013 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

354

Natural Gas Transmission and Distribution Module This  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2012 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

355

DEPARTMENT OF ENERGY National Electric Transmission Congestion...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Report Docket No. 2007-OE-01, Mid-Atlantic Area National Interest Electric Transmission Corridor; Docket No. 2007-0E-02, Southwest Area...

356

Directly correlated transmission electron microscopy and atom...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directly correlated transmission electron microscopy and atom probe tomography of grain boundary oxidation in a Ni-Al binary Directly correlated transmission electron microscopy...

357

Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming  

E-Print Network [OSTI]

of offering strategies for a wind power producer, Electricdevelop offering strategies for wind power production whilethe uncertainty in wind power and market prices. In [23],

Cardoso, Goncalo

2014-01-01T23:59:59.000Z

358

2014 Human Reliability Program Workshop | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3 Beryllium-Associated Worker2014 House Nuclear Cleanup Caucus Oak Ridge AugustHuman

359

2014 DOE Human Reliability Program (HRP) Workshop | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energyon ArmedWaste and Materials2014 Chief Freedom of Information Act (FOIA) OfficerDOE

360

Human Reliability Program (HRP) - HPMC Occupational Health Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun withconfinement plasmas inPortalAllBPAHydrazide Chemistry, and MassHuman

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Sandia National Laboratories: Materials & Manufacturing Reliability Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLS ExhibitIowaLos AlamosExperimentthe& Manufacturing

362

Introduction to Administrative Programs that Mitigate the Insider Threat  

SciTech Connect (OSTI)

This presentation begins with the reality of the insider threat, then elaborates on these tools to mitigate the insider threat: Human Reliability Program (HRP); Nuclear Security Culture (NSC) Program; Employee Assistance Program (EAP).

Gerke, Gretchen K.; Rogers, Erin; Landers, John; DeCastro, Kara

2012-09-01T23:59:59.000Z

363

High reliability plastic packaging for microelectronics  

SciTech Connect (OSTI)

Goal was Assembly Test Chips (ATCs) which could be used for evaluating plastic encapsulation technologies. Circuits were demonstrated for measuring Au-Al wirebond and Al metal corrosion failure rates during accelerated temperature and humidity testing. The test circuits on the ATC02.5 chip were very sensitive to extrinsic or processing induced failure rates. Accelerated aging experiments were conducted with unpassivated triple track Al structures on the ATC02.6 chip; the unpassivated tracks were found to be very sensitive to particulate contamination. Some modifications to existing circuitry were suggested. The piezoresistive stress sensing circuitry designed for the ATC04 test chip was found suitable for determining the change in the state of mechanical stress at the die when both initial and final measurements were made near room temperature (RT). Attempt to measure thermal stress between RT and a typical polymer glass transition temperature failed because of excessive die resistor- substrate leakage currents at the high temperature end; suitable circuitry changes were developed to overcome this problem. One temperature and humidity experiment was conducted with Sandia developed static radom access memory parts to examine non-corrosion CMOS failures; this objective was not achieved, but corrosion failure at the metal to Si contacts on the die surface could be detected. This 2-year effort resulted in new designs for test circuits which could be used on an advanced ATC for reliability assessment in Defense Programs electronics development projects.

Sweet, J.N.; Peterson, D.W.; Hsia, A.H.; Tuck, M.

1997-07-01T23:59:59.000Z

364

Manufacturing Metrology for c-Si Module Reliability/Durabiltiy...  

Broader source: Energy.gov (indexed) [DOE]

Manufacturing Metrology for c-Si Module ReliabilityDurabiltiy Manufacturing Metrology for c-Si Module ReliabilityDurabiltiy Presented at the PV Module Reliability Workshop,...

365

Nondestructive Examination (NDE) Reliability for Inservice Inspection of Light Water Reactors. Semiannual report, October 1990--March 1991: Volume 13  

SciTech Connect (OSTI)

The Evaluation and Improvement of NDE Reliability for Inservice Inspection of Light Water Reactors (NDE Reliability) Program at the Pacific Northwest Laboratory was established by the Nuclear Regulatory Commission to determine the reliability of current inservice inspection (ISI) techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this program include determining the reliability of ISI performed on the primary systems of commercial light-water reactors (LWRs); using probabilistic fracture mechanics analysis to determine the impact of NDE unreliability on system safety; and evaluating reliability improvements that can be achieved with improved and advanced technology. A final objective is to formulate recommended revisions to the Regulatory and ASME Code requirements, based on material properties, service conditions, and NDE uncertainties.

Doctor, S.R.; Good, M.S.; Heasler, P.G.; Hockey, R.L.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T.; Vo, T.V. [Pacific Northwest Lab., Richland, WA (United States)

1992-07-01T23:59:59.000Z

366

Substation grounding programs  

SciTech Connect (OSTI)

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 2, is a users manual and an installation and validation manual for the computer program SMECC (Substation Maximum Earth Current Computation Program). This program analyzes the electric current distribution among grounded structures inside and outside a substation for different fault conditions. The fault conditions are automatically selected by the program, or they may be specified by the user, or both. The fault condition resulting in maximum substation earth current is identified and reported. Data requirements for this program are: ground impedance, transformer data, transmission line data, transmission line grounding impedances, etc. The program provides four types of standard outputs: (1) a report of voltages and current flow in the unfaulted system, (2) a brief report of the maximum ground potential rise (worst fault condition), (3) a summary report of all fault conditions which have been analyzed by the program, and (4) a detailed report of voltages and current flow for a selected set of fault conditions.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

367

Module Packaging Research and Reliability: Activities and Capabilities  

SciTech Connect (OSTI)

Our team activities are directed at improving PV module reliability by incorporating new, more effective, and less expensive packaging materials and techniques. New and existing materials or designs are evaluated before and during accelerated environmental exposure for the following properties: (1) Adhesion and cohesion: peel strength and lap shear. (2) Electrical conductivity: surface, bulk, interface and transients. (3) Water vapor transmission: solubility and diffusivity. (4) Accelerated weathering: ultraviolet, temperature, and damp heat tests. (5) Module and cell failure diagnostics: infrared imaging, individual cell shunt characterization, coring. (6) Fabrication improvements: SiOxNy barrier coatings and enhanced wet adhesion. (7) Numerical modeling: Moisture ingress/egress, module and cell performance, and cell-to-frame leakage current. (8) Rheological properties of polymer encapsulant and sheeting materials. Specific examples are described.

McMahon, T. J.; delCueto, J.; Glick, S.; Jorgensen, G.; Kempe, M.; Pern, J.; Terwilliger, K.

2005-11-01T23:59:59.000Z

368

November 18, 2008 1 Abstract--In this paper, we analyze the N-1 reliable DC optimal  

E-Print Network [OSTI]

of the transmission element (line or transformer) and the model can be used for planning and/or operations. We or transformer) g: generator d: load c: operating state; c = 0 indicates the no contingency state (steady- stateNovember 18, 2008 1 Abstract--In this paper, we analyze the N-1 reliable DC optimal dispatch

Ferris, Michael C.

369

GRADUATE PROGRAM UNDERGRADUATE PROGRAMS  

E-Print Network [OSTI]

SELF STUDY GRADUATE PROGRAM UNDERGRADUATE PROGRAMS DEPARTMENT OF POLITICAL SCIENCE COLLEGE OF LIBERALARTS TEXAS A&M UNIVERSITY March 2007 #12;SELF STUDY GRADUATE PROGRAM UNDERGRADUATE PROGRAMS DEPARTMENT........................................................................................ 4 Brief History of Degree Programs and the Department

370

July 2, 2007 1 Optimal Transmission Switching  

E-Print Network [OSTI]

d to node n. zk: binary variable indicating whether transmission line k is removed from the system limit on number of open transmission lines Manuscript received July 2, 2007. This work was supported-mail: ferris@cs.wisc.edu). Sets : Set of all transmission lines L: Set of open transmission lines in solution

Mangasarian, Olvi L.

371

Utility-scale grid-tied PV inverter reliability workshop summary report.  

SciTech Connect (OSTI)

A key to the long-term success of the photovoltaic (PV) industry is confidence in the reliability of PV systems. Inverters are the most commonly noted cause of PV system incidents triggered in the field. While not all of these incidents are reliability-related or even necessarily failures, they still result in a loss of generated power. With support from the U.S. Department of Energy's Solar Energy Technologies Program, Sandia National Laboratories organized a Utility-Scale Grid-Tied Inverter Reliability Workshop in Albuquerque, New Mexico, January 27-28, 2011. The workshop addressed the reliability of large (100-kilowatt+) grid-tied inverters and the implications when such inverters fail, evaluated inverter codes and standards, and provided discussion about opportunities to enhance inverter reliability. This report summarizes discussions and presentations from the workshop and identifies opportunities for future efforts.

Granata, Jennifer E.; Quintana, Michael A.; Tasca, Coryne Adelle (SRA International, Inc., Fairfax, VA); Atcitty, Stanley

2011-07-01T23:59:59.000Z

372

Insulator damage endangers public, power reliability; ratepayers...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Insulator-damage-endangers-public-power-reliability-ratepayers-foot-repair-bill Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us...

373

General Order Ensuring Reliable Electric Service (Louisiana)  

Broader source: Energy.gov [DOE]

The standards set forth herein have been developed to provide consumers, the Louisiana Public Service Commission, and jurisdictional electric utilities with a uniform method of ensuring reliable...

374

Mechanical Reliability of Piezo-Stack Actuators  

Broader source: Energy.gov (indexed) [DOE]

Review Guidelines Mechanical Reliability of Piezo-Stack Actuators (Agreement 13329) Andrew A. Wereszczak, Hong Wang, and Hua-Tay Lin Oak Ridge National Laboratory Oak Ridge, TN...

375

Improving Wind Turbine Gearbox Reliability: Preprint  

SciTech Connect (OSTI)

This paper describes a new research and development initiative to improve gearbox reliability in wind turbines begun at the National Renewable Energy Laboratory (NREL) in Golden, Colorado, USA.

Musial, W.; Butterfield, S.; McNiff, B.

2007-06-01T23:59:59.000Z

376

Power as a function of reliability  

SciTech Connect (OSTI)

Many studies employ multiple measurement instruments such as human raters, observers, judges, or mechanical gauges to record subject data. It is well known that the consistency of these instruments, commonly called rater reliability, limits the extent to which conclusions should be drawn from the observed data. However, the degree to which rater reliability limits conclusions has traditionally been assessed in only subjective manners. In this paper, a method is developed for objectively quantifying the impact of rate reliability on the statistical analysis of data from a commonly used collection scheme. This method allows the inclusion of a reliability index in statistical power calculations and is an invaluable tool in the planning of experiments.

Abate, M.L. [Sandia National Labs., Albuquerque, NM (United States); McCabe, G.P.; Lynch, M.P. [Purdue Univ., Lafayette, IN (United States)

1995-10-01T23:59:59.000Z

377

Reliability and Maintainability Issues for the Next Linear Collider  

SciTech Connect (OSTI)

Large accelerators for high energy physics research traditionally have been designed using informal best design, engineering, and management practices to achieve acceptable levels of operational availability. However, the Next Linear Collider(NLC) project presents a particular challenge for operational availability due to the unprecedented size and complexity of the accelerator systems required to achieve the physics goals of high center-of-mass energy and high luminosity. Formal reliability and maintainability analysis, design, and implementation will be required to achieve acceptable operational availability for the high energy physics research program. This paper introduces some of the basic concepts of reliability analysis and applies them to the 2.6-cm microwave power system of the two 10-km-long, 250-GeV linacs that are currently proposed for the NLC design.

Wilson, Zane J.; Gold, Saul L.; Koontz, Ron F.; Lavine, Ted L.; /SLAC

2011-08-26T23:59:59.000Z

378

Transmission Lines Emulating Moving Media  

E-Print Network [OSTI]

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

379

Midwest Transmission Workshop III Summary  

SciTech Connect (OSTI)

OAK-B135 On March 12-13, 2002, the National Wind Coordinating Committee (NWCC), in cooperation with regional stakeholders, held a two-day workshop: Planning for Electrical Transmission Needs in the Upper Midwest. The workshop was the outgrowth of an effort to develop a forum and process for consideration of transmission options that strives for equitable allocation of benefits and impacts among all affected parties. The goal of this workshop was to provide a catalyst for an enhanced, inclusive process for transmission planning with participation of and acceptance by all affected stakeholders. Participants in the meeting included representatives of state and regional regulatory agencies, utilities and power generators, the wind industry, environmental and landowner interests, and other interested parties (see Attachment A for a list of meeting participants).

Kevin Bryan

2003-03-12T23:59:59.000Z

380

Reliability Module By: Alex Miller and Mark Robinson  

E-Print Network [OSTI]

Reliability Module By: Alex Miller and Mark Robinson Material Summarized from Reliability Module://spacese.spacegrant.org/). #12;Key Concepts Understanding the importance of reliability as an engineering discipline to calculate reliability Mathematically Visually (block diagrams) Source: Exploration Systems Engineering

Rhoads, James

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Project Profile: Physics-Based Reliability Models for Supercritical-CO2 Turbomachinery Components  

Broader source: Energy.gov [DOE]

GE, under the Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar (PREDICTS) Program will be leveraging internally developed models to predict the reliability of hybrid gas bearing (HGB) and dry gas seal (DGS) components in the turboexpander of a supercritical CO2 turbine. The Bayesian model is to include phase changes, low cycle fatigue/high cycle fatigue, dynamic instabilities, and corrosion processes.

382

Fundamental mechanisms of micromachine reliability  

SciTech Connect (OSTI)

Due to extreme surface to volume ratios, adhesion and friction are critical properties for reliability of Microelectromechanical Systems (MEMS), but are not well understood. In this LDRD the authors established test structures, metrology and numerical modeling to conduct studies on adhesion and friction in MEMS. They then concentrated on measuring the effect of environment on MEMS adhesion. Polycrystalline silicon (polysilicon) is the primary material of interest in MEMS because of its integrated circuit process compatibility, low stress, high strength and conformal deposition nature. A plethora of useful micromachined device concepts have been demonstrated using Sandia National Laboratories' sophisticated in-house capabilities. One drawback to polysilicon is that in air the surface oxidizes, is high energy and is hydrophilic (i.e., it wets easily). This can lead to catastrophic failure because surface forces can cause MEMS parts that are brought into contact to adhere rather than perform their intended function. A fundamental concern is how environmental constituents such as water will affect adhesion energies in MEMS. The authors first demonstrated an accurate method to measure adhesion as reported in Chapter 1. In Chapter 2 through 5, they then studied the effect of water on adhesion depending on the surface condition (hydrophilic or hydrophobic). As described in Chapter 2, they find that adhesion energy of hydrophilic MEMS surfaces is high and increases exponentially with relative humidity (RH). Surface roughness is the controlling mechanism for this relationship. Adhesion can be reduced by several orders of magnitude by silane coupling agents applied via solution processing. They decrease the surface energy and render the surface hydrophobic (i.e. does not wet easily). However, only a molecular monolayer coats the surface. In Chapters 3-5 the authors map out the extent to which the monolayer reduces adhesion versus RH. They find that adhesion is independent of RH up to a threshold value, depending on the coating chemistry. The mechanism for the adhesion increase beyond this threshold value is that the coupling agent reconfigures from a surface to a bulk phase (Chapter 3). To investigate the details of how the adhesion increase occurs, the authors developed the mechanics for adhesion hysteresis measurements. These revealed that near-crack tip compression is the underlying cause of the adhesion increase (Chapter 4). A vacuum deposition chamber for silane coupling agent deposition was constructed. Results indicate that vapor deposited coatings are less susceptible to degradation at high RH (Chapter 5). To address issues relating to surfaces in relative motion, a new test structure to measure friction was developed. In contrast to other surface micromachined friction test structures, uniform apparent pressure is applied in the frictional contact zone (Chapter 6). The test structure will enable friction studies over a large pressure and dynamic range. In this LDRD project, the authors established an infrastructure for MEMS adhesion and friction metrology. They then characterized in detail the performance of hydrophilic and hydrophobic films under humid conditions, and determined mechanisms which limit this performance. These studies contribute to a fundamental understanding for MEMS reliability design rules. They also provide valuable data for MEMS packaging requirements.

DE BOER,MAARTEN P.; SNIEGOWSKI,JEFFRY J.; KNAPP,JAMES A.; REDMOND,JAMES M.; MICHALSKE,TERRY A.; MAYER,THOMAS K.

2000-01-01T23:59:59.000Z

383

PV Performance and Reliability Validation Capabilities at Sandia...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Performance and Reliability Validation Capabilities at Sandia National Laboratories PV Performance and Reliability Validation Capabilities at Sandia National Laboratories This...

384

Nondestructive examination (NDE) reliability for inservice inspection of light waters reactors  

SciTech Connect (OSTI)

Evaluation and Improvement of NDE Reliability for Inservice Inspection of Light Water Reactors (NDE Reliability) Program at the Pacific Northwest Laboratory was established by the Nuclear Regulatory Commission to determine the reliability of current inservice inspection (ISI) techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this program include determining the reliability of ISI performed on the primary systems of commercial light-water reactors (LWRs); using probabilistic fracture mechanics analysis to determine the impact of NDE unreliability on system safety; and evaluating reliability improvements that can be achieved with improved and advanced technology. A final objective is to formulate recommended revisions to ASME Code and Regulatory requirements, based on material properties, service conditions, and NDE uncertainties. The program scope is limited to ISI of the primary systems including the piping, vessel, and other inspected components. This is a progress report covering the programmatic work from April 1988 through September 1988. 33 refs., 70 figs., 12 tabs.

Doctor, S.R.; Deffenbaugh, J.D.; Good, M.S.; Green, E.R.; Heasler, P.G.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T. (Pacific Northwest Lab., Richland, WA (USA))

1989-11-01T23:59:59.000Z

385

Physics-Based Stress Corrosion Cracking Component Reliability Model cast in an R7-Compatible Cumulative Damage Framework  

SciTech Connect (OSTI)

This is a working report drafted under the Risk-Informed Safety Margin Characterization pathway of the Light Water Reactor Sustainability Program, describing statistical models of passives component reliabilities.

Unwin, Stephen D.; Lowry, Peter P.; Layton, Robert F.; Toloczko, Mychailo B.; Johnson, Kenneth I.; Sanborn, Scott E.

2011-07-01T23:59:59.000Z

386

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

transmission right, electricity auction, simultaneous feasibility, transmission pricing. I. INTRODUCTION POINT

387

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

, transmission pricing. I. INTRODUCTION POINT-TO-POINT financial transmission rights (FTRs) (see [2] and [7

388

Cost estimation of HVDC transmission system of Bangka’s NPP candidates  

SciTech Connect (OSTI)

Regarding nuclear power plant development in Bangka Island, it can be estimated that produced power will be oversupply for the Bangka Island and needs to transmit to Sumatra or Java Island. The distance between the regions or islands causing considerable loss of power in transmission by alternating current, and a wide range of technical and economical issues. The objective of this paper addresses to economics analysis of direct current transmission system to overcome those technical problem. Direct current transmission has a stable characteristic, so that the power delivery from Bangka to Sumatra or Java in a large scale efficiently and reliably can be done. HVDC system costs depend on the power capacity applied to the system and length of the transmission line in addition to other variables that may be different.

Liun, Edwaren, E-mail: edwaren@batan.go.id; Suparman, E-mail: edwaren@batan.go.id [Centre for Nuclear Energy Development, National Nuclear Energy Agency of Indonesia (Indonesia)

2014-09-30T23:59:59.000Z

389

Reliability Meets Big Data: Opportunities and Challenges  

E-Print Network [OSTI]

products, the nature of field reliability data is changing dramatically. In particular, products can 1, 2013 Abstract Reliability field data such as that obtained from warranty claims and maintenance, however, many other potential applications for using such data. In this paper we review some applications

McCalley, James D.

390

Demand Response and Electric Grid Reliability  

E-Print Network [OSTI]

Demand Response and Electric Grid Reliability Paul Wattles Senior Analyst, Market Design & Development, ERCOT CATEE Conference, Galveston October 10, 2012 2 North American Bulk Power Grids CATEE Conference October 10, 2012 ? The ERCOT... adequacy ? ?Achieving more DR participation would . . . displace some generation investments, but would achieve the same level of reliability... ? ?Achieving this ideal requires widespread demand response and market structures that enable loads...

Wattles, P.

2012-01-01T23:59:59.000Z

391

Engineering Reliability into Web Sites: Google SRE  

E-Print Network [OSTI]

Engineering Reliability into Web Sites: Google SRE Alex Perry alex.perry@google.com Santa Monica SRE, Google #12;Abstract This talk introduces Site Reliability Engineering (SRE) at Google, explaining team responsibilities by site Failures and instability consuming manpower Engineering being applied

Tomkins, Andrew

392

Reliable Distributed Computing for Decision Support Systems  

E-Print Network [OSTI]

Reliable Distributed Computing for Decision Support Systems Taha Osman, Andrzej Bargiela Department of application tasks on the currently avail- able computing nodes. Distributed Systems Reliability Due decision-support systems such as water distribution net- works, involving hundreds or even thousands

Bargiela, Andrzej

393

Wind Energy Facility Reliability and Maintenance  

E-Print Network [OSTI]

Wind Energy Facility Reliability and Maintenance Eunshin Byon, Lewis Ntaimo, Chanan Singh and Yu related to wind energy facility reliability and mainte- nance focused more on qualitative aspects. In this chapter, we provide a comprehensive account of the existing research regarding wind energy facility

Ding, Yu

394

antimicrobial utilization program: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of energy conservation measures (ECMs... Lau, K.; Henderson, G.; Hebert, D. 3 Demand Response Programs Oregon Public Utility Commission Power Transmission, Distribution...

395

Power superconducting power transmission cable  

DOE Patents [OSTI]

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

396

Power Transmission, Distribution and Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Transmission, Distribution and Plants A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Abdel-Aal, Radwan E. - Computer Engineering Department, King Fahd University of...

397

Energy Efficiency Program Overview  

E-Print Network [OSTI]

Energy Efficiency Program Overview Clean Air Through Energy Efficiency CATEE Conference November 18-20, 2014 Dallas, TX ESL-KT-14-11-02 CATEE 2014: Clean Air Through Efficiency Conference, Dallas, Texas Nov. 18-20 General Overview • State of Texas... enacted legislation requiring Transmission and Distribution utilities (TDUs) achieve annual goals for energy efficiency • Public Utility Commission of Texas (PUCT) implemented rules and guidelines for consistency among the TDU programs • Texas TDUs...

Mutiso,S.

2014-01-01T23:59:59.000Z

398

OPTIMAL RELIABILITY ALLOCATION IN SERIES-PARALLEL SYSTEMS FROM COMPONENTS' DISCRETE COST -RELIABILITY DATA SETS  

E-Print Network [OSTI]

OPTIMAL RELIABILITY ALLOCATION IN SERIES-PARALLEL SYSTEMS FROM COMPONENTS' DISCRETE COST - RELIABILITY DATA SETS: A NESTED SIMULATED ANNEALING APPROACH Subba Rao V. Majety# , Srikanth It is generally accepted that a component's cost is an increasing function of its reliability. Most researchers

Smith, Alice E.

399

Reliable and Semi-reliable Communication with Authentication in Mobile Ad Hoc Networks  

E-Print Network [OSTI]

Reliable and Semi-reliable Communication with Authentication in Mobile Ad Hoc Networks Falko of wireless ad hoc sensor networks is the error-proneness and, therefore, the unreliability of communication describe a new approach and an according protocol for usage in ad hoc networks that provides reliable

Breu, Ruth

400

Structural reliability of brittle materials - an analytical method  

E-Print Network [OSTI]

on observed failure stress can be ex?la!ned. Pre~. ". cl (1) ?resents an example of this effect which illustrates the. mar'ked decrease in fai1ure. 'tran- th &7ith increasing test e1cment size z'hich is ob. . c;rved1. Testing of clem ni. . of varying... and Reliability of- Iic. chanlcal Systcr!s, Especially Ai craft Struct:ur es Aeronautical Syst. ems Div. , Al. SC, USA'& IIPAPB, Ohf o& (July 1961). 34 AI'!-";. I" D I X AN EX!DiPLE PPOBI, r:, &I '3'he comipuLcr programs presentecl in this paper do not...

Shields, Charles Burch

1967-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Shutdown heat removal system reliability in thermal reactors  

SciTech Connect (OSTI)

An analysis of the failure probability per year of the shutdown heat removal system (SHRS) at hot standby conditions for two thermal reactor designs is presented. The selected reactor designs are the Pressurized Water Reactor and the Nonproliferation Alternative System Assessment Program Heavy Water Reactor. Failures of the SHRS following the initiating transients of loss of offsite power and loss of main feedwater system are evaluated. Common mode failures between components are incorporated in this anlaysis via the ..beta..-factor method and the sensitivity of the system reliability to common mode failures is investigated parametrically.

Sun, Y.H.; Bari, R.A.

1980-01-01T23:59:59.000Z

402

RAPID/BulkTransmission/Transmission Siting & Interconnection | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: EnergyPotentialUrbanUtilityScalePVCapacityPulaskiRAPID/BulkTransmission/Texas < RAPID‎ |

403

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

2007. “Inclusion of Wind in the MISO Transmission Expansionhttp://www.jcspstudy.org/ Midwest ISO (MISO). 2007. Midwest+Planning Midwest ISO (MISO). 2003. Midwest Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

404

EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Plan  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

405

Reliability and economy -- Hydro electricity for Iran  

SciTech Connect (OSTI)

Reliability is the probability that a device or system will perform its function adequately, for the period of time intended, under the operating conditions intended. Reliability and economy are two important factors in operating any system, especially in power generation. Due to the high rate in population growth in Iran, the experts have estimated that the demand for electricity will be about 63,000 MW in the next 25 years, the installed power is now about 26,000 MW. Therefore, the energy policy decision made in Iran is to go to power generation by hydroelectric plants because of reliability, availability of water resources and the economics of hydroelectric power.

Jahromi-Shirazi, M.J.; Zarbakhsh, M.H. [Teleh Shofage Co., Ghazvin (Iran, Islamic Republic of)

1998-12-31T23:59:59.000Z

406

Final report for CCS cross-layer reliability visioning study  

SciTech Connect (OSTI)

The geometric rate of improvement of transistor size and integrated circuit performance known as Moore's Law has been an engine of growth for our economy, enabling new products and services, creating new value and wealth, increasing safety, and removing menial tasks from our daily lives. Affordable, highly integrated components have enabled both life-saving technologies and rich entertainment applications. Anti-lock brakes, insulin monitors, and GPS-enabled emergency response systems save lives. Cell phones, internet appliances, virtual worlds, realistic video games, and mp3 players enrich our lives and connect us together. Over the past 40 years of silicon scaling, the increasing capabilities of inexpensive computation have transformed our society through automation and ubiquitous communications. Looking forward, increasing unpredictability threatens our ability to continue scaling integrated circuits at Moore's Law rates. As the transistors and wires that make up integrated circuits become smaller, they display both greater differences in behavior among devices designed to be identical and greater vulnerability to transient and permanent faults. Conventional design techniques expend energy to tolerate this unpredictability by adding safety margins to a circuit's operating voltage, clock frequency or charge stored per bit. However, the rising energy costs needed to compensate for increasing unpredictability are rapidly becoming unacceptable in today's environment where power consumption is often the limiting factor on integrated circuit performance and energy efficiency is a national concern. Reliability and energy consumption are both reaching key inflection points that, together, threaten to reduce or end the benefits of feature size reduction. To continue beneficial scaling, we must use a cross-layer, Jull-system-design approach to reliability. Unlike current systems, which charge every device a substantial energy tax in order to guarantee correct operation in spite of rare events, such as one high-threshold transistor in a billion or one erroneous gate evaluation in an hour of computation, cross-layer reliability schemes make reliability management a cooperative effort across the system stack, sharing information across layers so that they only expend energy on reliability when an error actually occurs. Figure 1 illustrates an example of such a system that uses a combination of information from the application and cheap architecture-level techniques to detect errors. When an error occurs, mechanisms at higher levels in the stack correct the error, efficiently delivering correct operation to the user in spite of errors at the device or circuit levels. In the realms of memory and communication, engineers have a long history of success in tolerating unpredictable effects such as fabrication variability, transient upsets, and lifetime wear using information sharing, limited redundancy, and cross-layer approaches that anticipate, accommodate, and suppress errors. Networks use a combination of hardware and software to guarantee end-toend correctness. Error-detection and correction codes use additional information to correct the most common errors, single-bit transmission errors. When errors occur that cannot be corrected by these codes, the network protocol requests re-transmission of one or more packets until the correct data is received. Similarly, computer memory systems exploit a cross-layer division of labor to achieve high performance with modest hardware. Rather than demanding that hardware alone provide the virtual memory abstraction, software page-fault and TLB-miss handlers allow a modest piece of hardware, the TLB, to handle the common-case operations on a cyc1e-by-cycle basis while infrequent misses are handled in system software. Unfortunately, mitigating logic errors is not as simple or as well researched as memory or communication systems. This lack of understanding has led to very expensive solutions. For example, triple-modular redundancy masks errors by triplicating computations in either time or area. T

Quinn, Heather M [Los Alamos National Laboratory; Dehon, Andre [U. PENN; Carter, Nicj [INTEL

2010-12-20T23:59:59.000Z

407

Transmission  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler Tina ButlerTodayTransForumEnergyTransit

408

Midwest Transmission Workshop II Summary  

SciTech Connect (OSTI)

OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

Kevin Bryan

2002-12-05T23:59:59.000Z

409

Florida Electric Transmission Line Siting Act (Florida)  

Broader source: Energy.gov [DOE]

The Transmission Line Siting Act (TLSA) is the state’s centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15...

410

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

411

Progress in evaluation and improvement in nondestructive examination reliability for inservice inspection of Light Water Reactors (LWRs) and characterize fabrication flaws in reactor pressure vessels  

SciTech Connect (OSTI)

This paper is a review of the work conducted under two programs. One (NDE Reliability Program) is a multi-year program addressing the reliability of nondestructive evaluation (NDE) for the inservice inspection (ISI) of light water reactor components. This program examines the reliability of current NDE, the effectiveness of evolving technologies, and provides assessments and recommendations to ensure that the NDE is applied at the right time, in the right place with sufficient effectiveness that defects of importance to structural integrity will be reliably detected and accurately characterized. The second program (Characterizing Fabrication Flaws in Reactor Pressure Vessels) is assembling a data base to quantify the distribution of fabrication flaws that exist in US nuclear reactor pressure vessels with respect to density, size, type, and location. These programs will be discussed as two separate sections in this report. 4 refs., 7 figs.

Doctor, S.R.; Bowey, R.E.; Good, M.S.; Friley, J.R.; Kurtz, R.J.; Simonen, F.A.; Taylor, T.T.; Heasler, P.G.; Andersen, E.S.; Diaz, A.A.; Greenwood, M.S.; Hockey, R.L.; Schuster, G.J.; Spanner, J.C.; Vo, T.V.

1991-10-01T23:59:59.000Z

412

Impact of Transmission on Resource Adequacy in Systems with Wind and Solar Power: Preprint  

SciTech Connect (OSTI)

Variable generation is on track to become a significant contributor to electric power systems worldwide. Thus, it is important to analyze the effect that renewables will have on the reliability of systems. In this paper we present a new tool being implemented at the National Renewable Energy Laboratory, which allows the inclusion of variable generation in the power system resource adequacy. The tool is used to quantify the potential contribution of transmission to reliability in highly interconnected systems and an example is provided using the Western Interconnection footprint.

Ibanez, E.; Milligan, M.

2012-02-01T23:59:59.000Z

413

BPA Transmission Commercial Project Roadmap  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commercial Project Roadmap 15-Minute Scheduling Dynamic Transfer Program NT Redispatch WECC-Bal- 002 ST Comp & Preemption ST ATC Method. PCM Monthlyweekly Implementation PCM...

414

Final report : testing and evaluation for solar hot water reliability.  

SciTech Connect (OSTI)

Solar hot water (SHW) systems are being installed by the thousands. Tax credits and utility rebate programs are spurring this burgeoning market. However, the reliability of these systems is virtually unknown. Recent work by Sandia National Laboratories (SNL) has shown that few data exist to quantify the mean time to failure of these systems. However, there is keen interest in developing new techniques to measure SHW reliability, particularly among utilities that use ratepayer money to pay the rebates. This document reports on an effort to develop and test new, simplified techniques to directly measure the state of health of fielded SHW systems. One approach was developed by the National Renewable Energy Laboratory (NREL) and is based on the idea that the performance of the solar storage tank can reliably indicate the operational status of the SHW systems. Another approach, developed by the University of New Mexico (UNM), uses adaptive resonance theory, a type of neural network, to detect and predict failures. This method uses the same sensors that are normally used to control the SHW system. The NREL method uses two additional temperature sensors on the solar tank. The theories, development, application, and testing of both methods are described in the report. Testing was performed on the SHW Reliability Testbed at UNM, a highly instrumented SHW system developed jointly by SNL and UNM. The two methods were tested against a number of simulated failures. The results show that both methods show promise for inclusion in conventional SHW controllers, giving them advanced capability in detecting and predicting component failures.

Caudell, Thomas P. (University of New Mexico, Albuquerque, NM) [University of New Mexico, Albuquerque, NM; He, Hongbo (University of New Mexico, Albuquerque, NM) [University of New Mexico, Albuquerque, NM; Menicucci, David F. (Building Specialists, Inc., Albuquerque, NM) [Building Specialists, Inc., Albuquerque, NM; Mammoli, Andrea A. (University of New Mexico, Albuquerque, NM) [University of New Mexico, Albuquerque, NM; Burch, Jay (National Renewable Energy Laboratory, Golden CO) [National Renewable Energy Laboratory, Golden CO

2011-07-01T23:59:59.000Z

415

Adaptive Reliability Analysis of Excavation Problems  

E-Print Network [OSTI]

. This analysis couples the adaptive design capabilities of the observational method with updated reliability indices, to be used in risk-based design decisions. A probabilistic framework is developed to predict three-dimensional deformation profiles due...

Park, Jun Kyung

2012-10-19T23:59:59.000Z

416

Reliability-Based Optimization Using Evolutionary Algorithms  

E-Print Network [OSTI]

Uncertainties in design variables and problem parameters are often inevitable and must be considered in an optimization task if reliable optimal solutions are sought. Besides a number of sampling techniques, there exist ...

Deb, Kalyanmoy

417

Photovoltaic Reliability and Engineering (Revised) (Fact Sheet)  

SciTech Connect (OSTI)

Capabilities fact sheet for the National Center for Photovoltaics: Photovoltaic Reliability and Engineering. One-sided sheet that includes Scope, Core Competencies and Capabilities, and Contact/Web information.

Not Available

2011-06-01T23:59:59.000Z

418

Reliability Issues for Photovoltaic Modules (Presentation)  

SciTech Connect (OSTI)

Si modules good in field; new designs need reliability testing. CdTe & CIGS modules sensitive to moisture; carefully seal. CPV in product development stage; benefits from expertise in other industries.

Kurtz, S.

2009-10-01T23:59:59.000Z

419

PV Module Reliability Research (Fact Sheet)  

SciTech Connect (OSTI)

This National Center for Photovoltaics sheet describes the capabilities of its PV module reliability research. The scope and core competencies and capabilities are discussed and recent publications are listed.

Not Available

2013-06-01T23:59:59.000Z

420

Apply reliability centered maintenance to sealless pumps  

SciTech Connect (OSTI)

This paper reports on reliability centered maintenance (RCM) which is considered a crucial part of future reliability engineering. RCM determines the maintenance requirements of plants and equipment in their operating context. The RCM method has been applied to the management of critical sealless pumps in fire/toxic risk services, typical of the petrochemical industry. The method provides advantages from a detailed study of any critical engineering system. RCM is a team exercise and fosters team spirit in the plant environment. The maintenance strategy that evolves is based on team decisions and relies on maximizing the inherent reliability built into the equipment. RCM recommends design upgrades where this inherent reliability is being questioned. Sealless pumps of canned motor design are used as main reactor charge pumps in PVC plants. These pumps handle fresh vinyl chloride monomer (VCM), which is both carcinogenic and flammable.

Pradhan, S. (Exxon Chemicals Canada, Ontario (Canada))

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Demand Response For Power System Reliability: FAQ  

SciTech Connect (OSTI)

Demand response is the most underutilized power system reliability resource in North America. Technological advances now make it possible to tap this resource to both reduce costs and improve. Misconceptions concerning response capabilities tend to force loads to provide responses that they are less able to provide and often prohibit them from providing the most valuable reliability services. Fortunately this is beginning to change with some ISOs making more extensive use of load response. This report is structured as a series of short questions and answers that address load response capabilities and power system reliability needs. Its objective is to further the use of responsive load as a bulk power system reliability resource in providing the fastest and most valuable ancillary services.

Kirby, Brendan J [ORNL

2006-12-01T23:59:59.000Z

422

Reliability of copper interconnects in integrated circuits  

E-Print Network [OSTI]

As dimensions shrink and current densities increase, the reliability of metal interconnects becomes a serious concern. In copper interconnects, the dominant diffusion path is along the interface between the copper and the ...

Choi, Zung-Sun

2007-01-01T23:59:59.000Z

423

Reliability of lightning resistant overhead distribution lines  

SciTech Connect (OSTI)

An assessment of the 32 year historical reliability of the 13.8 kV electrical distribution system at the Oak Ridge National Laboratory (ORNL) in Tennessee has yielded several conclusions useful In the planning of Industrial power Systems. The system configuration at ORNL has essentially remained unchanged in the last 32 years which allows a meaningful comparison of reliability trends for the plant`s eight overhead distribution lines, two of which were built in the 1960`s with lightning resistant construction techniques. Meticulous records indicating the cause, duration, and location of 135 electric outages in the plant`s distribution system have allowed a reliability assessment to be performed. The assessment clearly shows how differences in voltage construction class, length, age, and maximum elevation above a reference elevation influence the reliability of overhead power distribution lines. Comparisons are also made between the ORNL historical data and predicted failure rates from ANSI and IEEE industry surveys.

Tolbert, L.M.; Cleveland, J.T.; Degenhardt, L.J.

1995-04-01T23:59:59.000Z

424

Gearbox Reliability Collaborative (GRC) Description and Loading  

SciTech Connect (OSTI)

This document describes simulated turbine load cases in accordance to the IEC 61400-1 Ed.3 standard, which is representative of the typical wind turbine design process. The information presented herein is intended to provide a broad understanding of the gearbox reliability collaborative 750kW drivetrain and turbine configuration. In addition, fatigue and ultimate strength drivetrain loads resulting from simulations are presented. This information provides the bases for the analytical work of the gearbox reliability collaborative effort.

Oyague, F.

2011-11-01T23:59:59.000Z

425

Reliability and Functional Availability of HVAC Systems  

E-Print Network [OSTI]

RELIABILITY AND FUNCTIONAL AVAILABILITY OF HVAC SYSTEMS Sonny Myrefelt Dep. of Build. Serv. Eng., KTH, 10044 Stockholm, Sweden, and SKANSKA Sydost, V?xj?, Sweden Summary This paper presents a model to calculate the reliability... system, therefore, there must be sufficient documentation of design airflow rates. The compulsory ventilation checks performed in Sweden have focused on the importance of maintaining the design air flow rates. More about this activity can be seen...

Myrefelt, S.

2004-01-01T23:59:59.000Z

426

Transmission Dr. Sandra Cruz-Pol  

E-Print Network [OSTI]

Transmission Lines Dr. Sandra Cruz-Pol ECE Dept. UPRM Exercise 11.3 n A 40-m long TL has Vg=15 Vrms to electric circuits! cmc kmc GHz Hz 15000,000,2000/ 000,560/ 2 60 == == Transmission Lines I. TL parameters-wave transformer ¨ Slotted line ¨ Single stub VI. Microstrips Transmission Lines (TL) n TL have two conductors

Cruz-Pol, Sandra L.

427

-Reliability Patrick Th. Eugster Rachid Guerraoui Petr Kouznetsov  

E-Print Network [OSTI]

-Reliability Patrick Th. Eugster Rachid Guerraoui Petr Kouznetsov Swiss Federal Institute of the reliability of broadcast algorithms, called - Reliability. This measure quantifies the reliability of practical broadcast algorithms that, on the one hand, were devised with some form of reliability in mind

Guerraoui, Rachid

428

Accelerated testing of metal foil tape joints and their effect of photovoltaic module reliability.  

SciTech Connect (OSTI)

A program is underway at Sandia National Laboratories to predict long-term reliability of photovoltaic (PV) systems. The vehicle for the reliability predictions is a Reliability Block Diagram (RBD), which models system behavior. Because this model is based mainly on field failure and repair times, it can be used to predict current reliability, but it cannot currently be used to accurately predict lifetime. In order to be truly predictive, physics-informed degradation processes and failure mechanisms need to be included in the model. This paper describes accelerated life testing of metal foil tapes used in thin-film PV modules, and how tape joint degradation, a possible failure mode, can be incorporated into the model.

Puskar, Joseph David; Quintana, Michael A.; Sorensen, Neil Robert; Lucero, Samuel J.

2009-07-01T23:59:59.000Z

429

Comments of New England Electric Transmission Corporation on...  

Broader source: Energy.gov (indexed) [DOE]

out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and...

430

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian...  

Energy Savers [EERE]

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands...

431

Fact #850: December 8, 2014 Automatic Transmissions have closed...  

Broader source: Energy.gov (indexed) [DOE]

Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed...

432

Technical and environmental aspects of electric power transmission  

SciTech Connect (OSTI)

This document summarizes the salient aspects of power systems and transmission-line technology and the effects of power-line construction and operation on human health and the environment. Major components of power systems are identified from the level of the individual consumer to that of the power pool, including the distribution, subtransmission, transmission, and power pool levels. This is followed by descriptions of the constituent parts and construction of power lines and the operational requirements and features of power lines and systems. Examples of topics include structure and conductor types, design, and selection; switching station and substation design and operation; and transmission line construction and upgrading. Emphasis is on the operational characteristics of transmission lines and of power systems and pools, including conductor and line parameters, insulation, faults, fault protection, electromagnetic field phenomena, corona phenomena, conductor motion, undesirable voltage levels, compensation, system protection, and system stability, reliability, and adequacy. Overhead dc lines, underground lines, and regulations and safety codes pertaining to power lines are briefly discussed. Environmental effects discussed include those stemming from route selection, clearing and construction, power-line operation, right-of-way maintenance, and the physical presence of structures. Examples of specific topics include visual and ecological criteria for route selection; right-of-way acquisition and land-use rights; effects of construction on soils, vegetation, and wildlife; impacts of right-of-way maintenance with herbicides or by cutting; types and use of herbicides; and power-line structure interference with TV reception and bird migration. Finally, the environmental impacts of the construction and operation of ac and dc underground lines are discussed.

Kroodsma, R.L.; Van Dyke, J.W.

1985-05-01T23:59:59.000Z

433

OE Issues Notice of Intent to Prepare an Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project  

Broader source: Energy.gov [DOE]

On December 21, 2012, DOE’s Office of Electricity Delivery and Energy Reliability (OE) issued a Notice of Intent (NOI) to Prepare an Environmental Impact Statement (EIS) for the Plains & Eastern Clean Line Transmission Project on behalf of the Department and Southwestern Power Administration

434

The transmission system as main actor in electricity market development in Romania  

SciTech Connect (OSTI)

At the beginning of 1998, Romanian Electricity Authority (RENEL) was a fully integrated generation, transmission and distribution company, which managed all aspects of planning, design, and operation of Romania' s electricity sector. This form of vertically integrated organization has enabled to develop the high voltage transmission system in order to transfer electricity from the large power plants on indigenous coal (lignite) to the deficit electricity areas. An analysis based on specific characteristics of Romanian Transmission System allows the identification of a suitable model cost for transmission services evaluation. The transmission electricity tariff as a market tool has become a necessity for the heterogeneous Romanian power systems from the repartition of the generation against the demand location point of view. The experience of the power system development planner shows that the most suitable model for the transmission electricity system cost assessment is the rated zones in order to reflect the geographical imbalance of generation and demand and the ability of the transmission system to accommodate this imbalance. Setting principles for the cost evaluation has to be sustained by the service evaluation on the grid nodes at the interface between transmission system and distribution system. This cost evaluation under the form of incentives for new producers has to be reconsidered year by year taking into account the evolution in time both production side and demand side. The incentives have to be addressed directly to the producers and must be strong enough to provide an efficient reliable operation of the whole power system. Transmission planners have to develop new approaches to deal with the uncertainties of the market; a combination of market forces and regulation seems to ensure the best way for the quality and security of the power system beside of the efficiency of all actors from the electricity market.

Petrescu, A.M.; Mihailescu, F.

1998-07-01T23:59:59.000Z

435

Automated manual transmission shift sequence controller  

DOE Patents [OSTI]

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Richard G. (Royal Oak, MI); Rausen, David J. (Denver, CO)

2000-02-01T23:59:59.000Z

436

Automated manual transmission mode selection controller  

DOE Patents [OSTI]

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI)

1999-11-09T23:59:59.000Z

437

EIS-0091: Garrison-Spokane 500-kV Transmission Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Bonneville Power Administration (BPA) developed this statement to evaluate the environmental impacts of constructing between 254 and 271 miles of 500-kilovolt transmission line across western Montana and northern Idaho to the Spokane area in order to reinforce a section of the BPA electric power grid and to permit reliable integration of 1,240 megawatts of power produced by Colstrip Units 3 and 4, for use in Montana and throughout the Northwest.

438

RELIABILITY OF WIND POWER FROM DISPERSED SITES: A PRELIMINARY ASSESSMENT  

E-Print Network [OSTI]

addresses itself to the reliability benefit of geograph-is a function of its reliability. typically want electricityI..I.ND DOCUMENTS SŁCTION Reliability of Wind Power From

Kahn, E.

2011-01-01T23:59:59.000Z

439

Reliability Optimization of Redundant Software with Correlated Failures  

E-Print Network [OSTI]

Reliability Optimization of Redundant Software with Correlated Failures Walter J. Gutjahr \\Lambda of reliability optimization of modular software with redundancy. At present, these approaches seem to be limited to generalize these reliability optimization techniques by taking such correlations explicitly

Gutjahr, Walter

440

Reliability Based Vegetation Management Through Intelligent System Monitoring  

E-Print Network [OSTI]

Reliability Based Vegetation Management Through Intelligent System Monitoring Final Project Report Research Center since 1996 PSERC #12;Power Systems Engineering Research Center Reliability Based Vegetation project titled "Reliability Based Vegetation Maintenance Through Intelligent System Monitoring (T-27)." We

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Reliability of ENSO Dynamical Predictions YOUMIN TANG AND RICHARD KLEEMAN  

E-Print Network [OSTI]

Reliability of ENSO Dynamical Predictions YOUMIN TANG AND RICHARD KLEEMAN Courant Institute, the authors have explored several important issues relating to ENSO predictability including reliability measures of ENSO dynamical predictions and the dominant precursors that control reliability. It was found

Tang, Youmin

442

Reliability based assessment of FRP rehabilitation of reinforced concrete girders  

E-Print Network [OSTI]

J.P. SE 224 Structural Reliability and Risk Analysis, CourseL.A. Statistical Methods for Reliability Data. AppliedA.S. ; Collins, K.R. Reliability of Structures; McGraw-Hill

Wilcox, Patrick Carlo

2008-01-01T23:59:59.000Z

443

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

444

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, R.B.

1985-08-15T23:59:59.000Z

445

Relativistic tunneling and accelerated transmission  

E-Print Network [OSTI]

We obtain the solutions for the tunneling zone of a one-dimensional electrostatic potential in the relativistic (Dirac to Klein-Gordon) wave equation regime when the incoming wave packet exhibits the possibility of being almost totally transmitted through the potential barrier. The conditions for the occurrence of accelerated and, eventually, superluminal tunneling transmission probabilities are all quantified and the problematic superluminal interpretation originated from the study based on non-relativistic dynamics of tunneling is overcome. The treatment of the problem suggests revealing insights into condensed-matter experiments using electrostatic barriers in single- and bi-layer graphene, for which the accelerated tunneling effect deserves a more careful investigation.

Alex E. Bernardini

2007-06-26T23:59:59.000Z

446

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

447

Puget Sound area electric reliability plan. Draft environmental impact statement  

SciTech Connect (OSTI)

The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

Not Available

1991-09-01T23:59:59.000Z

448

Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.  

SciTech Connect (OSTI)

The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

449

Sorghum Program BIOENERGY PROGRAM  

E-Print Network [OSTI]

Sorghum Program BIOENERGY PROGRAM Sorghums are important nongrain lignocellulosic feedstocks Biomass Switch Grass Forage Sorghum Bioenergy Sorghum Biomass per acre per year that can be converted (DT

450

Culture Representation in Human Reliability Analysis  

SciTech Connect (OSTI)

Understanding human-system response is critical to being able to plan and predict mission success in the modern battlespace. Commonly, human reliability analysis has been used to predict failures of human performance in complex, critical systems. However, most human reliability methods fail to take culture into account. This paper takes an easily understood state of the art human reliability analysis method and extends that method to account for the influence of culture, including acceptance of new technology, upon performance. The cultural parameters used to modify the human reliability analysis were determined from two standard industry approaches to cultural assessment: Hofstede’s (1991) cultural factors and Davis’ (1989) technology acceptance model (TAM). The result is called the Culture Adjustment Method (CAM). An example is presented that (1) reviews human reliability assessment with and without cultural attributes for a Supervisory Control and Data Acquisition (SCADA) system attack, (2) demonstrates how country specific information can be used to increase the realism of HRA modeling, and (3) discusses the differences in human error probability estimates arising from cultural differences.

David Gertman; Julie Marble; Steven Novack

2006-12-01T23:59:59.000Z

451

Modelling Reliability of Train Arrival Times  

E-Print Network [OSTI]

This paper deals with the scheduling of trains so as to minimise train trip times, whilst maximising reliability of arrival times. The amount of risk of delay associated with a schedule is used as the reliability component of a constrained schedule optimisation model. The paper outlines the model developed to quantify the risk of delays to individual trains, as well as to specific track segments and to the schedule as a whole. The risk model, which deals with single track operations, can be used to estimate the likely impact on reliability of arrival times of changes in train frequencies and operating practices; track and station infrastructure investment strategies; and train technology upgrading. An application of the model to the optimisation of schedules on a track corridor is described. The results obtained using the model are compared with the schedules used by train operations planning staff, in terms of overall delay and timetable reliability. The results highlight the significance of including a measure of timetable reliability, such as risk of delays, in the objective function for scheduling optimisation.

L. Ferreira; A. Higgins

452

BPA Fact Sheet - Preparing for reliability entity registration...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Preparing for reliability entity registration Based on the NERC Functional Model The Energy Policy Act of 2005 (EPAct 2005) strongly emphasized reliability of the nation's bulk...

453

Reliability of islanded microgrids with stochastic generation and prioritized load  

E-Print Network [OSTI]

The potential to improve distribution system reliability is a primary motivation behind the development and deployment of microgrids. Previous studies have illustrated substantial reliability benefits of dispatchable ...

Marden, Mirjana Milosevic

454

The Business Case for Fuel Cells 2013: Reliability, Resiliency...  

Broader source: Energy.gov (indexed) [DOE]

3: Reliability, Resiliency & Savings The Business Case for Fuel Cells 2013: Reliability, Resiliency & Savings This report, compiled by Fuel Cells 2000 with support from the Fuel...

455

Data Center Efficiency and IT Equipment Reliability at Wider...  

Broader source: Energy.gov (indexed) [DOE]

Center Efficiency and IT Equipment Reliability at Wider Operating Temperature and Humidity Ranges Data Center Efficiency and IT Equipment Reliability at Wider Operating Temperature...

456

Washington DC Reliability Requirements and the Need to Operate...  

Broader source: Energy.gov (indexed) [DOE]

Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005)...

457

Now Available: Smart Grid Investments Improve Grid Reliability...  

Energy Savers [EERE]

Smart Grid Investments Improve Grid Reliability, Resilience, and Storm Responses (November 2014) Now Available: Smart Grid Investments Improve Grid Reliability, Resilience, and...

458

Agenda for the PV Module Reliability Workshop, February 26 -...  

Broader source: Energy.gov (indexed) [DOE]

Agenda for the PV Module Reliability Workshop, February 26 - 27 2013, Golden, Colorado Agenda for the PV Module Reliability Workshop, February 26 - 27 2013, Golden, Colorado This...

459

Letter from Pepco Holdings Regarding the Reliability of Electric...  

Broader source: Energy.gov (indexed) [DOE]

from Pepco Holdings Regarding the Reliability of Electric Service in the District of Columbia Letter from Pepco Holdings Regarding the Reliability of Electric Service in the...

460

High Reliability, High TemperatureThermoelectric Power Generation...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Reliability, High TemperatureThermoelectric Power Generation Materials and Technologies High Reliability, High TemperatureThermoelectric Power Generation Materials and Technologies...

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Guide to Using Combined Heat and Power for Enhancing Reliability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Guide to Using Combined Heat and Power for Enhancing Reliability and Resiliency in Buildings Guide to Using Combined Heat and Power for Enhancing Reliability and Resiliency in...

462

Combined Heat and Power System Enables 100% Reliability at Leading...  

Broader source: Energy.gov (indexed) [DOE]

Enables 100% Reliability at Leading Medical Campus - Case Study, 2013 Combined Heat and Power System Enables 100% Reliability at Leading Medical Campus - Case Study, 2013 Thermal...

463

Effect of Jatropha based Biodiesel, on Engine Hardware Reliability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Jatropha based Biodiesel, on Engine Hardware Reliability, Emission and Performance Effect of Jatropha based Biodiesel, on Engine Hardware Reliability, Emission and Performance...

464

The Office of Electricity Delivery and Energy Reliability is...  

Broader source: Energy.gov (indexed) [DOE]

The Office of Electricity Delivery and Energy Reliability is Closely Monitoring Hurricane Irene (2011) The Office of Electricity Delivery and Energy Reliability is Closely...

465

Office of Electricity Delivery & Energy Reliability FY 2012 Budget...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Office of Electricity Delivery & Energy Reliability FY 2012 Budget Request Presentation Office of Electricity Delivery & Energy Reliability FY 2012 Budget Request Presentation...

466

Office of Electricity Delivery and Energy Reliability Cyber Security...  

Broader source: Energy.gov (indexed) [DOE]

Office of Electricity Delivery and Energy Reliability Cyber Security Project Selections Office of Electricity Delivery and Energy Reliability Cyber Security Project Selections On...

467

Clean coal technology programs: program update 2006  

SciTech Connect (OSTI)

The purpose of the Clean Coal Technology Programs: Program Update 2006 is to provide an updated status of the DOE commercial-scale demonstrations of clean coal technologies (CCTs). These demonstrations are performed under the Clean Coal Technology Demonstration Program (CCTDP), the Power Plant Improvement Initiative (PPII) and the Clean Coal Power Initiative (CCPI). Program Update 2006 provides 1) a discussion of the role of clean coal technology demonstrations in improving the nation's energy security and reliability, while protecting the environment using the nation's most abundant energy resource - coal; 2) a summary of the funding and costs of the demonstrations; and 3) an overview of the technologies being demonstrated, with fact sheets for demonstration projects that are active, recently completed, withdrawn or ended, including status as of June 30 2006. 4 apps.

NONE

2006-09-15T23:59:59.000Z

468

Clean Coal Technology Programs: Program Update 2009  

SciTech Connect (OSTI)

The purpose of the Clean Coal Technology Programs: Program Update 2009 is to provide an updated status of the U.S. Department of Energy (DOE) commercial-scale demonstrations of clean coal technologies (CCT). These demonstrations have been performed under the Clean Coal Technology Demonstration Program (CCTDP), the Power Plant Improvement Initiative (PPII), and the Clean Coal Power Initiative (CCPI). Program Update 2009 provides: (1) a discussion of the role of clean coal technology demonstrations in improving the nation’s energy security and reliability, while protecting the environment using the nation’s most abundant energy resource—coal; (2) a summary of the funding and costs of the demonstrations; and (3) an overview of the technologies being demonstrated, along with fact sheets for projects that are active, recently completed, or recently discontinued.

None

2009-10-01T23:59:59.000Z

469

History of wireless power transmission  

SciTech Connect (OSTI)

The history of wireless power transmission at microwave frequencies is reviewed with emphasis upon the time period starting with the post World War II efforts to use the new microwave technology developed during the war. A nationally televised demonstration of a microwave powered helicopter at the Spencer Laboratory of the Raytheon Co., in 1964 was the result of these early efforts and broadly introduced the concept of wireless power transmission to scientific and engineering communities and to the public. Subsequent development efforts centered on improving the efficiency of the interconversion of d.c. and microwave power at the ends of the system to reach a demonstrated overall d.c. to d.c. system efficiency of 54% in 1974. The response to the requirements of applications such as the Solar Power Satellite and high altitude microwave powered aircraft have changed the direction of technology development and greatly expanded the technology base. Recent and current efforts are centered on examining the use of higher frequencies than the baseline 2.45 GHz, and in reducing the system costs at 2.45 GHz. 26 refs., 14 figs.

Brown, W.C. [Microwave Power Transmission Systems, Weston, MA (United States)] [Microwave Power Transmission Systems, Weston, MA (United States)

1996-12-31T23:59:59.000Z

470

Nondestructive Examination (NDE) Reliability for Inservice Inspection of Light Water Reactors. Semiannual report, April 1992--September 1992: Volume 16  

SciTech Connect (OSTI)

The Evaluation and Improvement of NDE Reliability for Inservice inspection of Light Water Reactors (NDE Reliability) Program at the Pacific Northwest Laboratory was established by the Nuclear Regulatory Commission to determine the reliability of current inservice inspection (ISI) techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this program include determining the reliability of ISI performed on the primary systems of commercial light-water reactors (LWRs);using probabilistic fracture mechanics analysis to determine the impact of NDE unreliability on system safety; and evaluating reliability improvements that can be achieved with improved and advanced technology. A final objective is to formulate recommended revisions to the Regulatory and ASME Code requirements, based on material properties, service conditions, and NDE uncertainties. The program scope is limited to ISI of the primary systems including the piping, vessel and other components inspected in accordance with Section XI of the ASME Code. This is a programs report covering the programmatic work from April 1992 through September 1992.

Doctor, S.R.; Diaz, A.A.; Friley, J.R.; Greenwood, M.S.; Heasler, P.G.; Kurtz, R.J.; Simonen, F.A.; Spanner, J.C.; Vo, T.V. [Pacific Northwest Lab., Richland, WA (United States)

1993-11-01T23:59:59.000Z

471

Wind Integration, Transmission, and Resource Assessment andCharacteri...  

Broader source: Energy.gov (indexed) [DOE]

Integration, Transmission, and Resource Assessment and Characterization Projects Wind Integration, Transmission, and Resource Assessment and Characterization Projects From 2006 to...

472

Gearbox Reliability Collaborative Update: A Brief (Presentation)  

SciTech Connect (OSTI)

This presentation is an update on the Gearbox Reliability Collaborative (GRC) for the AWEA Wind Project Operations, Maintenance & Reliability Seminar. GRC accomplishments are: (1) Failure database software deployed - partners see business value for themselves and customers; (2) Designed, built, instrumented, and tested two gearboxes - (a) Generated unprecedented public domain test data from both field testing and dynamometer testing, (b) Different responses from 'identical' gearboxes, (c) Demonstrated importance of non-torque loading and modeling approach; and (3) Active collaborative, with wide industry support, leveraging DOE funding - Modeling round robin and Condition Monitoring round robin.

Sheng, S.; Keller, J.; McDade, M.

2012-01-01T23:59:59.000Z

473

Sandia National Laboratories: PV Systems Reliability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLSMolten-SaltReliability PV Systems Reliability Sandia recognizes

474

Sandia National Laboratories: PV Systems Reliability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLSMolten-SaltReliability PV Systems Reliability Sandia

475

OG&E's Power Quality Program  

E-Print Network [OSTI]

Our commitment to reliable electric power does not stop at the meter, but extends all the way to the equipment that it operates. Through the Power Quality Program, we provide professional power consultants to assure that the customer has quality...

Davis, M.

476

DOE Hydrogen Program New Fuel Cell Projects  

E-Print Network [OSTI]

Development Building Weatherization & Intergovernmental Geothermal Hydrogen Wind & Hydropower #12;Integrated Production EERE is working to provide a prosperous future where energy is clean, abundant, reliable Davis - Safety, Codes/Standards Antonio Ruiz - Safety Engineer Hydrogen Technologies Program Patrick

477

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

478

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

479

Increasing the reliability of the shutdown of 500 - 750-kV overhead lines equipped with shunt reactors in an unsuccessful three-phase automatic repeated closure cycle  

SciTech Connect (OSTI)

The reasons for circuit-breaker failures during repeated disconnection of 500 - 750 kV overhead lines with shunt reactors in a cycle of unsuccessful three-phase automatic reconnection (TARC) are analyzed. Recommendations are made for increasing the operating reliability of power transmission lines with shunt reactors when there is unsuccessful reconnection.

Kuz'micheva, K. I.; Merzlyakov, A. S.; Fokin, G. G. [JSC 'R and D Center at Federal Grid Company of the United Power System' (Russian Federation)

2013-05-15T23:59:59.000Z

480

Grid Reliability- An Electric Utility Company's Perspective  

Broader source: Energy.gov [DOE]

Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—covers Southern Company's business continuity, North American Electric Reliability Corporation (NERC) cybersecurity, and homeland security as well as physical recovery after a major outage, and five questions to ask your local utility.

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Relatedness influences signal reliability in evolving robots  

E-Print Network [OSTI]

minute in an arena containing a food and a poison source that both emitted red light (figure 1). Robots could distinguish food and poison only at a very close range. The performance of robots was proportional related robots produced signals that reliably indicated the location of the food source and thereby

Floreano, Dario

482

New correlation calculates reliable paraffin solubilities  

SciTech Connect (OSTI)

A new correlation based on boiling point has been developed which accurately calculates paraffin solubilities in water. The correlation provides reliable solubility values down to very low concentrations (parts per million and less), for which the API correlation is not accurate. It can be used for initial engineering studies, including those involving health, safety, and environmental considerations.

Yaws, C.L.; Pan, X. (Lamar Univ., Beaumont, TX (US))

1991-04-08T23:59:59.000Z

483

Interval Analysis and Reliability in Robotics  

E-Print Network [OSTI]

be highly reliable (i.e. for a robot used in surgical applications). The sources of uncertainties will restrict ourself in this paper to industrial robot. These type of robots have a base that is attached the mechanism motion). There are two main classes of industrial robots mechani- cal architecture: serial

Paris-Sud XI, Université de

484

"Reliability, Resiliency, and Restoration for Smarter Grid  

E-Print Network [OSTI]

"Reliability, Resiliency, and Restoration for Smarter Grid Workshop" Save the Date April 3 and 4 at mohlsen@bnl.gov "The Resilient Smart Grid" to be held at Brookhaven National Laboratory Upton, Long Island://www.bnl.gov/maps/. This is the 5th workshop that BNL is hosting on the Smart Grid. This Workshop will build on the previous

Ohta, Shigemi

485

Reliable Link Maintenance in Cognitive Radio Systems  

E-Print Network [OSTI]

resources and overcome the under-utilization of licensed spectrum. Since the licensed user still keeps) have to vacate the spectrum in case the licensed user claims it. In order to maintain the qualityReliable Link Maintenance in Cognitive Radio Systems Daniel Willkomm, James Gross and Adam Wolisz

Gross, James

486

Transmission Reassignment Reporting Requirement - April 2, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Transmission Reassignment Reporting Requirement This notice...

487

Transmission and Generation Investment in Electricity Markets  

E-Print Network [OSTI]

Mar 4, 2015 ... The model incorporates investment decisions of the transmission operator and private firms in expectation of an energy-only market and ...

Grimm Veronika

2015-03-04T23:59:59.000Z

488

2009 National Electric Transmission Congestion Study - Oklahoma...  

Broader source: Energy.gov (indexed) [DOE]

- Oklahoma City Workshop 2009 National Electric Transmission Congestion Study - Oklahoma City Workshop On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City,...

489

Natural Gas Transmission Pipeline Siting Act (Florida)  

Broader source: Energy.gov [DOE]

This Act establishes a centralized and coordinated permitting process for the location of natural gas transmission pipeline corridors and the construction and maintenance of natural gas...

490

Transmission Expansion Planning Using an AC Model ...  

E-Print Network [OSTI]

Western Interconnection” under contract DOE-FOA0000068. ... problem to determine locations for placing new transmission ... KNITRO and BONMIN are de

Periodicals

2013-01-02T23:59:59.000Z

491

Energy Department, Arizona Utilities Announce Transmission Infrastruct...  

Office of Environmental Management (EM)

project that will serve the state's growing electrical energy needs, attract renewable energy development to the area, and strengthen the transmission system in the Southwestern...

492

Exploring the Business Link Opportunity: Transmission & Clean...  

Energy Savers [EERE]

Jennifer Weddle, Greenberg Traurig LLP Rapid Response Team for Transmission: Laura Smith Morton, DOE Energy Storage: Michael Stosser, Day Pitney LLP Centennial West Clean...

493

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

494

Flexible Transmission in the Smart Grid  

E-Print Network [OSTI]

New England Outlook: Smart Grid is About Consumers,” Apr. [Transmission in the Smart Grid By Kory Walter Hedman ATransmission in the Smart Grid by Kory Walter Hedman Doctor

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

495

Detonator comprising a nonlinear transmission line  

DOE Patents [OSTI]

Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

Elizondo-Decanini, Juan M

2014-12-30T23:59:59.000Z

496

TransWest Express Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of the Anschutz Corporation. The Project consists of an overhead transmission line extending approximately 725 miles from south-central Wyoming crossing Colorado and...

497

Reliability-Based Decision Making: A Comparison of Statistical Approaches  

E-Print Network [OSTI]

Reliability-Based Decision Making: A Comparison of Statistical Approaches J. M. Aughenbaugh whose reliability is well established and a new component that has an unknown reliability. In some scenarios, the designer may have some initial beliefs about the new component's reliability. The designer

Herrmann, Jeffrey W.

498

ContentsContents4466Reliability and quality control  

E-Print Network [OSTI]

ContentsContents4466Reliability and quality control 1. Reliability 2. Quality Control Learning outcomes You will first learn about the importance of the concept of reliability applied to systems previous experience with certain mathematical topics this time may vary considerably. 1 #12;Reliability

Vickers, James

499

ORNL/TM-2004/91 MEASUREMENT PRACTICES FOR RELIABILITY  

E-Print Network [OSTI]

ORNL/TM-2004/91 MEASUREMENT PRACTICES FOR RELIABILITY AND POWER QUALITY A TOOLKIT OF RELIABILITY MEASUREMENT PRACTICES June 2004 #12;#12;ORNL/TM-2004/91 MEASUREMENT PRACTICES FOR RELIABILITY AND POWER QUALITY A TOOLKIT OF RELIABILITY MEASUREMENT PRACTICES John D. Kueck and Brendan J. Kirby Oak Ridge

Oak Ridge National Laboratory

500

Applications of the Cross-Entropy Method in Reliability  

E-Print Network [OSTI]

Applications of the Cross-Entropy Method in Reliability Dirk P. Kroese and Kin-Ping Hui University and components that are all sub- ject to failure. Reliability theory studies the failure behavior of such sys, even for the most basic reliability models, the overall reliability of the system can be difficult

Kroese, Dirk P.