  1. Transmission Reliability Program 2015 Reliability & Markets Peer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program 2015 Reliability & Markets Peer Review Materials Available Transmission Reliability Program 2015 Reliability & Markets Peer Review Materials Available September 16, 2015 -...

  2. 2013 Transmission Reliability Program Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Reliability Program Peer Review 2013 Transmission Reliability Program Peer Review The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations are available through the individual session links. The agenda and introduction by Joe Eto, LBNL, are available below. Day 1: June 27 Session I Baselining Studies and Analysis, Bharat Bhargava, EPG Baselining Studies and Analysis, Brett Amidan, PNNL Synchrophasor Standards Support and

  3. 2014 Transmission Reliability Program Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Reliability Program Peer Review 2014 Transmission Reliability Program Peer Review The Transmission Reliability Program Peer Review included 20 presentations over 2 days on June 3 - 4, 2014 in Washington, DC. Presentations are available through the links. The agenda is included below. Day 1: June 3 Session I Synchrophasor Standards Support and Development, Allen Goldstein, NIST Advanced Synchrophasor Metrology, Paul Ewing, ORNL Technology Assessment for Next Generation PMU, Mark

  4. 2015 Transmission Reliability Program Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Reliability Program Peer Review 2015 Transmission Reliability Program Peer Review The Transmission Reliability Program Peer Review included 25 presentations over 2 days on June 10 - 11, 2015, in Washington, DC. Presentations are available through the links for each day. The agenda is included below. Day 1: June 10 Session I Measurement-Based Stability Assessment, Dan Trudnowski, Montana Tech Application of VARPRO Ambient Mode Estimation, Bernie Lesieutre, U Wisconsin WSU Oscillation

  5. Transmission Reliability Program 2015 Reliability & Markets Peer Review Materials Available

    Broader source: Energy.gov [DOE]

    The Office of Electricity Delivery and Energy Reliability held a peer review of Reliability & Markets Program on August 4-5 at Cornell University in Ithaca, NY. Materials including the agenda and presentations are now available for download.

  6. 2013 Transmission Reliability Program Peer Review- Day 2 Presentations

    Broader source: Energy.gov [DOE]

    The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Here are presentations from Day 2 (Sessions V and VI).

  7. 2012 CERTS Transmission Reliability R&D Internal Program Review...

    Energy Savers [EERE]

    FY12 DOE - CERTS Transmission Reliability R&D Internal Program Review June 12-13, 2012 ... & 10 minutes Q&A 10 - 10:30: Automatic Reliability Reports (ARR) Research & ...

  8. 2013 Transmission Reliability Program Peer Review | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sauer, U. Illinois Automatic Reliability Reports (ARR) Research & Implementation, Carlos Martinez, ASR, Inc. Reliability Standards Analysis and Assessment, Gil Tam, EPG 2013 TR...

  9. 2010 Transmission Reliability Program Peer Review | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on two key areas: 1) Real-Time Grid Reliability Management and 2) Reliability and Markets. ... and performing real-time analysis of market behavior and its impact on market performance. ...

  10. 2013 Transmission Reliability Program Peer Review - Day 1 Presentations |

    Energy Savers [EERE]

    Department of Energy 1 Presentations 2013 Transmission Reliability Program Peer Review - Day 1 Presentations The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Bharat Bhargava (EPG), Brett Amidan (PNNL), Ken Martin (EPG) Session II: Mark Buckner (ORNL) Session III: Dan Trudnowski (U Montana), Ning Zhou (PNNL) Session IV: Frank Tuffner (PNNL), Bernie

  11. 2014 Transmission Reliability Program Peer Review - Day 2 Presentations |

    Energy Savers [EERE]

    Department of Energy 2 Presentations 2014 Transmission Reliability Program Peer Review - Day 2 Presentations The Transmission Reliability Program Peer Review included 6 sessions over 2 days on June 3- 4, 2014. Presentations from Day 2 (Sessions V and VI) are available below. Session V: Simon Mo (Electric Power Group), Jim Thorp (VA Tech), Scott Ghiocel (RPI), Dave Schoenwald (Sandia) Session VI: Bharat Bhargava (Electric Power Group), Brett Amidan (PNNL), Philip Irminger (ORNL) PDF icon 2014

  12. 2015 Transmission Reliability Program Peer Review - Day 2 Presentations |

    Energy Savers [EERE]

    Department of Energy 2 Presentations 2015 Transmission Reliability Program Peer Review - Day 2 Presentations The 2015 Transmission Reliability Program Peer Review included 8 sessions over 2 days on June 10 - 11, 2015, in Washington, DC. Presentations from Day 2 (Sessions V through VIII) are available below. Session V: Alejandro Dominguez-Garcia/Pete Sauer (U Illinois), Carlos Martinez (ASR), Song Xue (Electric Power Group) Session VI: Pavel Etingov (PNNL, two presentations), Bharat Bhargava

  13. 2012 CERTS Transmission Reliability R&D Internal Program Review - Agenda

    Energy Savers [EERE]

    FY12 DOE - CERTS Transmission Reliability R&D Internal Program Review June 12-13, 2012 LBNL Project Office 901 D St., SW Washington DC Nancy Lewis' cell: 510.918.3155 Revised Agenda: June 5, 2012 June 12, Day 1 7:30: Refreshments 8 - 8:30: Welcome, Introductions, DOE remarks Phil Overholt, DOE; Carl Imhoff, PNNL; Joe Eto, LBNL SESSION I: 20 minute presentations & 10 minutes Q&A 8:30 - 9: Measurement-Based Stability Assessment, Dan Trudnowski, University of Montana 9 - 9:30: Mode

  14. Transmission Reliability Peer Review Materials Now Available

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Electricity Delivery and Energy Reliability held a peer review of the Transmission Reliability Program on June 10-11, 2015, in Washington, DC. Materials including the agenda and presentations are now available for download.

  15. Transmission Reliability | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will

  16. Sandia Energy - Inverter Reliability Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Inverter Reliability Program Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics PV Systems Reliability Inverter Reliability Program Inverter Reliability...

  17. Human Reliability Program Overview

    SciTech Connect (OSTI)

    Bodin, Michael

    2012-09-25

    This presentation covers the high points of the Human Reliability Program, including certification/decertification, critical positions, due process, organizational structure, program components, personnel security, an overview of the US DOE reliability program, retirees and academia, and security program integration.

  18. Human Reliability Program Workshop

    SciTech Connect (OSTI)

    Landers, John; Rogers, Erin; Gerke, Gretchen

    2014-05-18

    A Human Reliability Program (HRP) is designed to protect national security as well as worker and public safety by continuously evaluating the reliability of those who have access to sensitive materials, facilities, and programs. Some elements of a site HRP include systematic (1) supervisory reviews, (2) medical and psychological assessments, (3) management evaluations, (4) personnel security reviews, and (4) training of HRP staff and critical positions. Over the years of implementing an HRP, the Department of Energy (DOE) has faced various challenges and overcome obstacles. During this 4-day activity, participants will examine programs that mitigate threats to nuclear security and the insider threat to include HRP, Nuclear Security Culture (NSC) Enhancement, and Employee Assistance Programs. The focus will be to develop an understanding of the need for a systematic HRP and to discuss challenges and best practices associated with mitigating the insider threat.

  19. 2013 Transmission Reliability R&D Peer Review Presentations Available |

    Energy Savers [EERE]

    Department of Energy 3 Transmission Reliability R&D Peer Review Presentations Available 2013 Transmission Reliability R&D Peer Review Presentations Available September 9, 2013 - 3:25pm Addthis The agendas and presentations from the June and August 2013 Transmission Reliability R&D Program reviews are now available for download. The June 27-28 Transmission Reliability Program review combined the North American Synchrophasor Initiative (NASPI) and Advanced Application Development

  20. Transmission Infrastructure Program

    Energy Savers [EERE]

    TRANSMISSION INFRASTRUCTURE PROGRAM DOE Tribal Energy Summit 2015 SECRETARYOF ENERGY'S FINANCING ROUNDTABLE Tracey A. LeBeau Senior Vice President & Transmission Infrastructure Program Manager 1 Program Description Western's Loan Authority * $3.25 billion permanent authority (revolving) * Goal: Attract investment in infrastructure & address market needs * Commercial underwriting standards TIP Portfolio Management Fundamentals * Reflective of Market Need(s) * Ensure Funds Revolve 2 Recent

  1. Value-based reliability transmission planning

    SciTech Connect (OSTI)

    Dalton, J.G. III; Garrison, D.L.; Fallon, C.M.

    1996-08-01

    This paper presents a new value-based reliability planning (VBRP) process proposed for planning Duke Power Company`s (DPC) regional transmission system. All transmission served customers are fed from DPC`s regional transmission system which consists of a 44-kV predominantly radial system and a 100-kV predominantly non-radial system. In the past, any single contingency that could occur during system peak conditions and cause a thermal overload required the overloaded facility to be upgraded, regardless of the costs or the likelihood of the overload occurring. The new VBRP process is based on transmission system reliability evaluation and includes the following important elements: (1) a ten-year historical data base describing the probabilities of forced outages for lines and transformers; (2) a five-year average load duration curve describing the probability of an overload should a contingency occur; (3) a customer outage cost data base; (4) and probabilistic techniques. The new process attempts to balance the costs of improving service reliability with the benefits or value that these improvements bring to these customers. The objective is to provide the customers their required level of reliability while minimizing the Total Cost of their electric service.

  2. 2014 DOE Human Reliability Program (HRP) Workshop | Department of Energy

    Energy Savers [EERE]

    Reliability & Markets Peer Review 2013 Reliability & Markets Peer Review The Transmission Reliability R&D Reliability & Markets Peer Review included 13 presentations over 2 days on August 6 - 7, 2013 at Cornell University in Ithaca, NY. Presentations are available through the links. The agenda and list of presentations are included below. The Reliability and Markets activity of the Transmission Reliability program researches, develops, and implements electricity infrastructure

  3. Joint transmission system projects to improve system reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    County PUD, 425-783-8444 Joint transmission system projects to improve system reliability First major regional electric grid improvements in decades prepare the area for the...

  4. Human Reliability Program Handbook | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Human Reliability Program Handbook Human Reliability Program Handbook What is the HRP? The HRP is a security and safety reliability program designed to ensure that individuals who occupy positions affording access to certain materials, nuclear explosive devices, facilities, and programs meet the highest standards of reliability and physical and mental suitability. This objective is accomplished through a system of continuous evaluation that identifies individuals whose judgment and reliability

  5. Transmission Reliability "Load as a Resource" Peer Review Materials...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "Load as a Resource" Peer Review Materials Now Available Transmission Reliability "Load as a Resource" Peer Review Materials Now Available September 25, 2014 - 11:43am Addthis OE's...

  6. 2014 Human Reliability Program Workshop Agenda | Department of...

    Office of Environmental Management (EM)

    Human Reliability Program Workshop Agenda 2014 Human Reliability Program Workshop Agenda September 17-19, 2014 2014 DOE Human Reliability Program Workshop And Webinar Agenda DOE ...

  7. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    SciTech Connect (OSTI)

    Kirby, Brendan J

    2006-07-01

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

  8. Reliability and Markets Program Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability and Markets Program Information Reliability and Markets Program Information Summary of the Tranmission Reliability program's Reliability and Markets activity area. The program helps to increase grid reliability and reduce costs for customers using integrated market and engineering tools. PDF icon Reliability and Markets Program Factsheet.pdf More Documents & Publications 2014 Reliability & Markets Peer Review 2013 Reliability & Markets Peer Review 2012 Reliability &

  9. Transmission Reliability "Load as a Resource" Peer Review Materials Now Available

    Office of Energy Efficiency and Renewable Energy (EERE)

    OE’s Transmission Reliability program is conducting R&D projects on “Load as a Resource” (LaaR) that explore how various types of customer loads could be turned on and off for short periods of time to provide services normally performed by generators. A program peer review was held on September 16, 2014. Materials including the agenda and presentations are now available.

  10. 2010 Transmission Reliability Program Peer Review | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the system. The second area focuses on developing a comprehensive set of integrated market and engineering design principles, tools, and technologies to support efficient,...

  11. OMB 1910-5122, Human Reliability Program - Description of Collections |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy OMB 1910-5122, Human Reliability Program - Description of Collections OMB 1910-5122, Human Reliability Program - Description of Collections Human Reliability Program Certification (DOE F 470.3). Under the Department of Energy Human Reliability Program (HRP), individuals who are applicants for or incumbents in designated positions must be evaluated to ensure that they meet the requirements for certification in the program. This form documents that each part of the

  12. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  13. Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues

    SciTech Connect (OSTI)

    Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

    2008-07-01

    California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

  14. Transmission

    Energy Savers [EERE]

    ~ Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of

  15. EIS-0285: Transmission System Vegetation Management Program

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations. This...

  16. 2014 Transmission Reliability Program Peer Review - Day 1 Presentations |

    Energy Savers [EERE]

    Energy 2014 SunShot Grand Challenge Summit Opening Session Photos 2014 SunShot Grand Challenge Summit Opening Session Photos Addthis SunShot Grand Challenge Summit Opening Session 1 of 35 SunShot Grand Challenge Summit Opening Session Anaheim Mayor Tom Tait with SunShot Director Minh Le Credit: SunShot Initiative Date taken: 2014-05-19 16:01 SunShot Grand Challenge Summit Opening Session 2 of 35 SunShot Grand Challenge Summit Opening Session SunShot Director Minh Le Credit: SunShot

  17. 2015 Transmission Reliability Program Peer Review - Day 1 Presentations |

    Energy Savers [EERE]

    5 SunShot Incubator Virtual Showcase Slides 2015 SunShot Incubator Virtual Showcase Slides Download the slides from the 2015 SunShot Initiative Incubator Virtual Showcase webinar on March 4, 2015 below. You can also read the transcript. PDF icon Click here to download the webinar slides. More Documents & Publications 2014 SunShot Initiative Portfolio Book: Technology to Market PRESENTATION: OVERVIEW OF THE SUNSHOT INITIATIVE Revitalizing American Competitiveness in Solar Technologies

  18. Achieving High Reliability Operations Through Multi-Program Integration

    SciTech Connect (OSTI)

    Holly M. Ashley; Ronald K. Farris; Robert E. Richards

    2009-04-01

    Over the last 20 years the Idaho National Laboratory (INL) has adopted a number of operations and safety-related programs which has each periodically taken its turn in the limelight. As new programs have come along there has been natural competition for resources, focus and commitment. In the last few years, the INL has made real progress in integrating all these programs and are starting to realize important synergies. Contributing to this integration are both collaborative individuals and an emerging shared vision and goal of the INL fully maturing in its high reliability operations. This goal is so powerful because the concept of high reliability operations (and the resulting organizations) is a masterful amalgam and orchestrator of the best of all the participating programs (i.e. conduct of operations, behavior based safety, human performance, voluntary protection, quality assurance, and integrated safety management). This paper is a brief recounting of the lessons learned, thus far, at the INL in bringing previously competing programs into harmony under the goal (umbrella) of seeking to perform regularly as a high reliability organization. In addition to a brief diagram-illustrated historical review, the authors will share the INLs primary successes (things already effectively stopped or started) and the gaps yet to be bridged.

  19. Western Area Power Administration Transmission Infrastructure Program

    Energy Savers [EERE]

    Department of Energy Western Area Power Administration Borrowing Authority, Recovery Act Western Area Power Administration Borrowing Authority, Recovery Act PDF icon Microsoft Word - PSRP May 15 2009 _WAPA Borrowing Authority_ Final.docx More Documents & Publications WAPA Recovery Act Implementation Appropriation Microsoft Word - PSRP Updates 6-25-10_v2 Bonneville Power Administration Program Specific Recovery Plan

    TIP Program Overview Craig Knoell, Program Manager November 2009 TIP

  20. Probabilistic Approach to Quantifying the Contribution of Variable Generation and Transmission to System Reliability: Preprint

    SciTech Connect (OSTI)

    Ibanez, E.; Milligan, M.

    2012-09-01

    The increasing electrical load served by variable generation (VG), such as wind and solar energy, in the United States and many other countries has stimulated an interesting line of research to better quantify the capacity value of these resources. Methods applied traditionally to thermal units based on their average outage rates do not apply to VG because of their uncertain and non-dispatchable nature. The North American Electric Reliability Corporation's Integration of Variable Generation Task Force recently released a report that highlighted the need to develop and benchmark underlying loss-of-load expectation and related metrics that reasonably and fairly calculate the contribution to planning reserves, or capacity value, of solar and wind power. As the fraction of generation coming from VG becomes more significant, their estimated capacity value will have a larger impact on system planning. In this paper, we provide a method to include VG in traditional probabilistic-based adequacy methods. This method has been implemented in the Renewable Energy Probabilistic Resource Assessment tool developed at the National Renewable Energy Laboratory. Through an example based on the U.S. Western Interconnection, this method is applied to assess the effect that transmission can have on resource adequacy. We also analyze the interactions between available transmission and capacity value for VG.

  1. Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission

    Broader source: Energy.gov [DOE]

    On March 4, 2009, the Department of Energy’s Office of Electricity Delivery and Energy Reliability (OE) will conduct a technical conference in the Washington, DC area to discuss the design of future electric transmission. The technical conference will discuss the likely demand for future electric transmission and whether the development of conceptual alternative extra high voltage (EHV) systems would assist generation developers, State energy policy officials, utility planners, and other stakeholders.

  2. Scanning Transmission X-ray Microscope Control Program

    Energy Science and Technology Software Center (OSTI)

    2005-08-05

    User Interface and control software or C++ to run on specifically equipped computer running Windows Operating Systems. Program performs specific control functions required to operate Interferometer controlled scanning transmission X-ray microscopes at ALS beamlines 532 and 11.0.2. Graphical user interface facilitates control, display images and spectra.

  3. Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01

    Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

  4. NNSA Awards Contract for Reliable Fuel Supply Program | National...

    National Nuclear Security Administration (NNSA)

    ... enable countries with good nonproliferation credentials to pursue nuclear power generation. ... NNSA maintains and enhances the safety, security, reliability and performance of the ...

  5. High-Power Microwave Transmission and Mode Conversion Program

    SciTech Connect (OSTI)

    Vernon, Ronald J.

    2015-08-14

    This is a final technical report for a long term project to develop improved designs and design tools for the microwave hardware and components associated with the DOE Plasma Fusion Program. We have developed basic theory, software, fabrication techniques, and low-power measurement techniques for the design of microwave hardware associated gyrotrons, microwave mode converters and high-power microwave transmission lines. Specifically, in this report we discuss our work on designing quasi-optical mode converters for single and multiple frequencies, a new method for the analysis of perturbed-wall waveguide mode converters, perturbed-wall launcher design for TE0n mode gyrotrons, quasi-optical traveling-wave resonator design for high-power testing of microwave components, and possible improvements to the HSX microwave transmission line.

  6. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-15)

    SciTech Connect (OSTI)

    N /A

    2001-06-19

    BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines. Work also includes clearing of a small (<1/4 mile) section of access road. All work will be in accordance with the National Electrical Safety Code and BPA standards. See Section 1.1 of the attached checklist for detailed information on each section of the referenced transmission lines. BPA will conduct the vegetation control with the goal of removing tall-growing vegetation that is currently or will soon be a hazard to the transmission lines and where possible to promote low-growing plant communities in the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The vegetation needing control is mainly Douglas Fir, Alder, and blackberries as indicated in Section 1.2 of the attached checklist. The work involved in the ROW includes: clearing tall growing vegetation that is currently or will soon pose a hazard to the lines; treating the associated stumps and re-sprouts with herbicide to ensure that the roots are killed preventing new sprouts; and selectively eliminating tall growing vegetation before it reaches a height or density to begin competing with low-growing vegetation. All work will take place in existing rights-of-ways and around transmission structures. All work will be accomplished by selective vegetation control methods to assure that there is little potential harm to non-target vegetation and to low-growing plants. The work will provide system reliability and fire protection. Also, all off right-of-way trees that are potentially unstable and will fall within a minimum distance or into the zone where the conductors swing will be removed. Access roads will be treated using mowing and herbicide applications. The work will provide system reliability. The subject transmission lines range from 115kV to 230kV and are made up of accompanying access roads, steel and wooden transmission line structures and associated switching platforms. The minimum clearance ranges from 21 feet for 115kV lines to 23 feet for 230kV lines. ROW easement widths vary along the length of the project. Vegetation control for this project is designed to provide a 3 year maintenance free interval. In summary, the overall vegetation management scheme will be to selectively remove tall growing vegetation then apply selective herbicide treatment using cut stump applications.

  7. Reliable, Lightweight Transmissions For Off-Shore, Utility Scale Wind Turbines

    SciTech Connect (OSTI)

    Jean-Claude Ossyra

    2012-10-25

    The objective of this project was to reduce the technical risk for a hydrostatic transmission based drivetrain for high-power utility-size wind turbines. A theoretical study has been performed to validate the reduction of cost of energy (CoE) for the wind turbine, identify risk mitigation strategies for the drive system and critical components, namely the pump, shaft connection and hydrostatic transmission (HST) controls and address additional benefits such as reduced deployment costs, improved torque density and improved mean time between repairs (MTBR).

  8. 2013 Reliability & Markets Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability & Markets Peer Review 2013 Reliability & Markets Peer Review The Transmission Reliability R&D Reliability & Markets Peer Review included 13 presentations over 2 days on August 6 - 7, 2013 at Cornell University in Ithaca, NY. Presentations are available through the links. The agenda and list of presentations are included below. The Reliability and Markets activity of the Transmission Reliability program researches, develops, and implements electricity infrastructure

  9. 2014 Reliability & Markets Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability & Markets Peer Review 2014 Reliability & Markets Peer Review The Transmission Reliability R&D Reliability & Markets Peer Review included 15 presentations over 2 days on August 5 - 6, 2014 at Cornell University in Ithaca, NY. Presentations are available through the links. The agenda and list of presentations are included below. The Reliability and Markets activity of the Transmission Reliability program researches, develops, and implements electricity infrastructure

  10. 2015 Reliability & Markets Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability & Markets Peer Review 2015 Reliability & Markets Peer Review The Transmission Reliability R&D Reliability & Markets Peer Review included 16 presentations over 2 days on August 4 - 5, 2015 at Cornell University in Ithaca, NY. Presentations are available through the links. The agenda and list of presentations are available below. The Reliability and Markets activity of the Transmission Reliability program researches, develops, and implements electricity infrastructure

  11. Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming

    SciTech Connect (OSTI)

    Cardoso, Goncalo; Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; DeForest, Nicholas; Barbosa-Povoa, Ana; Ferrao, Paulo

    2013-05-23

    This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6percent.

  12. July 24, 2009, Visiting Speakers Program - Regulation and High Reliability Organizations by Dr. Jerry Ellig

    Energy Savers [EERE]

    Regulation and High Reliability Organizations Jerry Ellig Senior Research Fellow Prepared for the U.S. Department of Energy Office of Health, Safety, and Security Visiting Speakers Program National Academy of Public Administration July 24, 2009 High Reliability Organizations � "Avoid catastrophes in high-risk, complex operating environments ... consistently deliver year-in/year-out high value and high performance regardless of their operating environment." � Key principle: Reality

  13. Supplement Analysis for the Transmission System Vegetation Management Program FEIS

    SciTech Connect (OSTI)

    N /A

    2001-03-27

    BPA proposes to clear unwanted vegetation from a section of BPA's Ponderosa--Pilot Butte Transmission Line Right-of-way to facilitate relocation of structure 18/3. Work would begin in mid-March and end in April, 2001. (1) Description of right-of-way and vegetation management needed--The project involves cutting all tall growing trees and brush within BPA's 100-foot wide transmission line right-of-way. An encroachment by the City of Bend Sewer Treatment facility, and future expansion plans, compelled the relocation of this portion of the right-of-way. Structures 18/2 and 18/4 will be modified in place to accommodate the new angle of the right-of-way. Structure 18/3 will be moved approximately 300 feet westerly to allow for the expansion of the sewer treatment facility. Only vegetation within the new portion of the right-of-way, totaling approximately 3.5 acres, will be controlled. No herbicides will be used on this project. Vegetation to be controlled: Juniper trees are the only tall growing tree species within this portion of the right-of-way requiring treatment. The density of vegetation within the new right-of-way is light to medium. The right-of-way boundaries will be examined for danger trees and if found, danger trees will be marked and cut according to danger tree policy.

  14. EIS-0097: Bonneville Power Administration Transmission Facilities Vegetation Management Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Bonneville Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with implementing a vegetation management program.

  15. BPA's Third-party Program for Acquiring and financing Transmission...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    payments are not an "all-in" cost of the related project. The exact extent of potential property tax liability is uncertain at this time. The costs of the master lease program...

  16. Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    SciTech Connect (OSTI)

    Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

    2011-02-01

    The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

  17. INSPECTION REPORT Procurement Administration and Human Reliability Program Revocations Within the

    Energy Savers [EERE]

    Procurement Administration and Human Reliability Program Revocations Within the Office of Secure Transportation OAI-M-16-07 March 2016 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 March 21, 2016 MEMORANDUM FOR THE ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION ASSOCIATE UNDER SECRETARY, OFFICE OF ENVIRONMENT, HEALTH, SAFETY, AND SECURITY FROM: George W. Collard Deputy Inspector General for Audits and

  18. 2012 CERTS Transmission Reliability R&D Internal Program Review - Participant List

    Energy Savers [EERE]

    Participants Affliation 1 Alison Silverstein Guest 2 Anjan Bose CERTS, DOE 3 Bharat Bhargava CERTS 4 Bob Cummings Guest, NERC 5 Brett Amidan CERTS 6 Carl Imhoff CERTS 7 Carlos Martinez CERTS 8 Dan Sobajic Guest, Consultant 9 Dan Trudnowski Non-CERTS performer, Montana Tech 10 Daniel Kheloussi Guest, Energetics 11 Donald Davies Guest, WECC 12 Eddy Lim Guest, FERC 13 Gil Bindewald Guest, DOE 14 Gil Tam CERTS 15 Henry Huang CERTS 16 Isabelle Snyder CERTS 17 Jay Caspany Guest, DOE 18 Jeff Dagle

  19. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Quality Assurance Manual

    SciTech Connect (OSTI)

    C. L. Smith; R. Nims; K. J. Kvarfordt; C. Wharton

    2008-08-01

    The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment using a personal computer running the Microsoft Windows operating system. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC). The role of the INL in this project is that of software developer and tester. This development takes place using formal software development procedures and is subject to quality assurance (QA) processes. The purpose of this document is to describe how the SAPHIRE software QA is performed for Version 6 and 7, what constitutes its parts, and limitations of those processes.

  20. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-09)

    SciTech Connect (OSTI)

    N /A

    2001-05-01

    BPA proposes to clear unwanted vegetation from the rights of way and access roads for BPA's McNary-Santiam No. 1 Transmission Line, beginning in the summer of 2000 and ending in July, 2001. This Supplemental Analysis finds that: (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285) and ROD; and (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.

  1. 2014 WIND POWER PROGRAM PEER REVIEW-RELIABILITY & A2E

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability and A2e March 24-27, 2014 Wind Energy Technologies PR-5000-62152 2 Contents Reliability and A2e CREW (Continuous Reliability Enhancement for Wind) Database & Analysis ...

  2. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) GEM Manual

    SciTech Connect (OSTI)

    C. L. Smith; J. Schroeder; S. T. Beck

    2008-08-01

    The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer running the Microsoft Windows? operating system. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory (INL). The INL's primary role in this project is that of software developer and tester. Using the SAPHIRE analysis engine and relational database is a complementary program called GEM. GEM has been designed to simplify using existing PRA analysis for activities such as the NRC’s Accident Sequence Precursor program. In this report, the theoretical framework behind GEM-type calculations are discussed in addition to providing guidance and examples for performing evaluations when using the GEM software. As part of this analysis framework, the two types of GEM analysis are outlined, specifically initiating event (where an initiator occurs) and condition (where a component is failed for some length of time) assessments.

  3. Field Operations Program Chevrolet S-10 (Lead-Acid) Accelerated Reliability Testing - Final Report

    SciTech Connect (OSTI)

    J. Francfort; J. Argueta; M. Wehrey; D. Karner; L. Tyree

    1999-07-01

    This report summarizes the Accelerated Reliability testing of five lead-acid battery-equipped Chevrolet S-10 electric vehicles by the US Department of Energy's Field Operations Program and the Program's testing partners, Electric Transportation Applications (ETA) and Southern California Edison (SCE). ETA and SCE operated the S-10s with the goal of placing 25,000 miles on each vehicle within 1 year, providing an accelerated life-cycle analysis. The testing was performed according to established and published test procedures. The S-10s' average ranges were highest during summer months; changes in ambient temperature from night to day and from season-to-season impacted range by as much as 10 miles. Drivers also noted that excessive use of power during acceleration also had a dramatic effect on vehicle range. The spirited performance of the S-10s created a great temptation to inexperienced electric vehicle drivers to ''have a good time'' and to fully utilize the S-10's acceleration capability. The price of injudicious use of power is greatly reduced range and a long-term reduction in battery life. The range using full-power accelerations followed by rapid deceleration in city driving has been 20 miles or less.

  4. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Data Loading Manual

    SciTech Connect (OSTI)

    C. L. Smith; K. J. Kvarfordt; S. T. Wood

    2008-08-01

    The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory. This report is intended to assist the user to enter PRA data into the SAPHIRE program using the built-in MAR-D ASCII-text file data transfer process. Towards this end, a small sample database is constructed and utilized for demonstration. Where applicable, the discussion includes how the data processes for loading the sample database relate to the actual processes used to load a larger PRA models. The procedures described herein were developed for use with SAPHIRE Version 6.0 and Version 7.0. In general, the data transfer procedures for version 6 and 7 are the same, but where deviations exist, the differences are noted. The guidance specified in this document will allow a user to have sufficient knowledge to both understand the data format used by SAPHIRE and to carry out the transfer of data between different PRA projects.

  5. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Data Loading Manual

    SciTech Connect (OSTI)

    C. L. Smith; K. J. Kvarfordt; S. T. Wood

    2006-07-01

    The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory. This report is intended to assist the user to enter PRA data into the SAPHIRE program using the built-in MAR-D ASCII-text file data transfer process. Towards this end, a small sample database is constructed and utilized for demonstration. Where applicable, the discussion includes how the data processes for loading the sample database relate to the actual processes used to load a larger PRA models. The procedures described herein were developed for use with SAPHIRE Version 6.0 and Version 7.0. In general, the data transfer procedures for version 6 and 7 are the same, but where deviations exist, the differences are noted. The guidance specified in this document will allow a user to have sufficient knowledge to both understand the data format used by SAPHIRE and to carry out the transfer of data between different PRA projects.

  6. EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Program

    Broader source: Energy.gov [DOE]

    Western Area Power Administration prepared an EA that assesses potential environmental impacts of the proposed continuation of operation and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System in Arizona, California, and Nevada. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

  7. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Code Reference Manual

    SciTech Connect (OSTI)

    C. L. Smith; K. J. Kvarfordt; S. T. Wood

    2008-08-01

    The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer. SAPHIRE is funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory (INL). The INL's primary role in this project is that of software developer. However, the INL also plays an important role in technology transfer by interfacing and supporting SAPHIRE users comprised of a wide range of PRA practitioners from the NRC, national laboratories, the private sector, and foreign countries. SAPHIRE can be used to model a complex systems response to initiating events, quantify associated damage outcome frequencies, and identify important contributors to this damage (Level 1 PRA) and to analyze containment performance during a severe accident and quantify radioactive releases (Level 2 PRA). It can be used for a PRA evaluating a variety of operating conditions, for example, for a nuclear reactor at full power, low power, or at shutdown conditions. Furthermore, SAPHIRE can be used to analyze both internal and external initiating events and has special features for transforming models built for internal event analysis to models for external event analysis. It can also be used in a limited manner to quantify risk in terms of release consequences to both the public and the environment (Level 3 PRA). SAPHIRE includes a separate module called the Graphical Evaluation Module (GEM). GEM provides a highly specialized user interface with SAPHIRE that automates SAPHIRE process steps for evaluating operational events at commercial nuclear power plants. Using GEM, an analyst can estimate the risk associated with operational events in a very efficient and expeditious manner. This reference guide will introduce the SAPHIRE Version 7.0 software. A brief discussion of the purpose and history of the software is included along with general information such as installation instructions, starting and stopping the program, and some pointers on how to get around inside the program. Next, database concepts and structure are discussed. Following that discussion are nine sections, one for each of the menu options on the SAPHIRE main menu, wherein the purpose and general capabilities for each option are furnished. Next, the capabilities and limitations of the software are provided.

  8. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Code Reference Manual

    SciTech Connect (OSTI)

    C. L. Smith; K. J. Kvarfordt; S. T. Wood

    2006-07-01

    The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer. SAPHIRE is funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory (INL). The INL's primary role in this project is that of software developer. However, the INL also plays an important role in technology transfer by interfacing and supporting SAPHIRE users comprised of a wide range of PRA practitioners from the NRC, national laboratories, the private sector, and foreign countries. SAPHIRE can be used to model a complex systems response to initiating events, quantify associated damage outcome frequencies, and identify important contributors to this damage (Level 1 PRA) and to analyze containment performance during a severe accident and quantify radioactive releases (Level 2 PRA). It can be used for a PRA evaluating a variety of operating conditions, for example, for a nuclear reactor at full power, low power, or at shutdown conditions. Furthermore, SAPHIRE can be used to analyze both internal and external initiating events and has special features for ansforming models built for internal event analysis to models for external event analysis. It can also be used in a limited manner to quantify risk in terms of release consequences to both the public and the environment (Level 3 PRA). SAPHIRE includes a separate module called the Graphical Evaluation Module (GEM). GEM provides a highly specialized user interface with SAPHIRE that automates SAPHIRE process steps for evaluating operational events at commercial nuclear power plants. Using GEM, an analyst can estimate the risk associated with operational events in a very efficient and expeditious manner. This reference guide will introduce the SAPHIRE Version 7.0 software. A brief discussion of the purpose and history of the software is included along with general information such as installation instructions, starting and stopping the program, and some pointers on how to get around inside the program. Next, database concepts and structure are discussed. Following that discussion are nine sections, one for each of the menu options on the SAPHIRE main menu, wherein the purpose and general capabilities for each option are furnished. Next, the capabilities and limitations of the software are provided.

  9. Maui Smart Grid Demonstration Project Managing Distribution System Resources for Improved Service Quality and Reliability, Transmission Congestion Relief, and Grid Support Functions

    SciTech Connect (OSTI)

    none,

    2014-09-30

    The Maui Smart Grid Project (MSGP) is under the leadership of the Hawaii Natural Energy Institute (HNEI) of the University of Hawaii at Manoa. The project team includes Maui Electric Company, Ltd. (MECO), Hawaiian Electric Company, Inc. (HECO), Sentech (a division of SRA International, Inc.), Silver Spring Networks (SSN), Alstom Grid, Maui Economic Development Board (MEDB), University of Hawaii-Maui College (UHMC), and the County of Maui. MSGP was supported by the U.S. Department of Energy (DOE) under Cooperative Agreement Number DE-FC26-08NT02871, with approximately 50% co-funding supplied by MECO. The project was designed to develop and demonstrate an integrated monitoring, communications, database, applications, and decision support solution that aggregates renewable energy (RE), other distributed generation (DG), energy storage, and demand response technologies in a distribution system to achieve both distribution and transmission-level benefits. The application of these new technologies and procedures will increase MECO’s visibility into system conditions, with the expected benefits of enabling more renewable energy resources to be integrated into the grid, improving service quality, increasing overall reliability of the power system, and ultimately reducing costs to both MECO and its customers.

  10. R&D program benefits estimation: DOE Office of Electricity Delivery and Energy Reliability

    SciTech Connect (OSTI)

    None, None

    2006-12-04

    The overall mission of the U.S. Department of Energy’s Office of Electricity Delivery and Energy Reliability (OE) is to lead national efforts to modernize the electric grid, enhance the security and reliability of the energy infrastructure, and facilitate recovery from disruptions to the energy supply. In support of this mission, OE conducts a portfolio of research and development (R&D) activities to advance technologies to enhance electric power delivery. Multiple benefits are anticipated to result from the deployment of these technologies, including higher quality and more reliable power, energy savings, and lower cost electricity. In addition, OE engages State and local government decision-makers and the private sector to address issues related to the reliability and security of the grid, including responding to national emergencies that affect energy delivery. The OE R&D activities are comprised of four R&D lines: High Temperature Superconductivity (HTS), Visualization and Controls (V&C), Energy Storage and Power Electronics (ES&PE), and Distributed Systems Integration (DSI).

  11. Central Wind Power Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities

    SciTech Connect (OSTI)

    Porter, K.; Rogers, J.

    2009-12-01

    The report addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America.

  12. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Version 5.0: Data loading manual. Volume 10

    SciTech Connect (OSTI)

    VanHorn, R.L.; Wolfram, L.M.; Fowler, R.D.; Beck, S.T.; Smith, C.L.

    1995-04-01

    The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) suite of programs can be used to organize and standardize in an electronic format information from probabilistic risk assessments or individual plant examinations. The Models and Results Database (MAR-D) program of the SAPHIRE suite serves as the repository for probabilistic risk assessment and individual plant examination data and information. This report demonstrates by examples the common electronic and manual methods used to load these types of data. It is not a stand alone document but references documents that contribute information relative to the data loading process. This document provides a more detailed discussion and instructions for using SAPHIRE 5.0 only when enough information on a specific topic is not provided by another available source.

  13. Central Wind Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities: Revised Edition

    SciTech Connect (OSTI)

    Rogers, J.; Porter, K.

    2011-03-01

    The report and accompanying table addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America. The first part of the table focuses on electric utilities and regional transmission organizations that have central wind power forecasting in place; the second part focuses on electric utilities and regional transmission organizations that plan to adopt central wind power forecasting in 2010. This is an update of the December 2009 report, NREL/SR-550-46763.

  14. Self-Reliability and Motivation in a Nuclear Security Culture Enhancement Program

    SciTech Connect (OSTI)

    Rogers,E.; deBoer,G.; Crawford, C.; De Castro, K.; Landers, J.

    2009-10-19

    The threat of nuclear terrorism has become a global concern. Many countries continue to make efforts to strengthen nuclear security by enhancing systems of nuclear material protection, control, and accounting (MPC&A). Though MPC&A systems can significantly upgrade nuclear security, they do not eliminate the "human factor." Gen. Eugene Habiger, a former "Assistant Secretary for Safeguards and Security" at the U.S. Department of Energy’s (DOE) nuclear-weapons complex and a former commander of U.S. strategic nuclear forces, has observed that "good security is 20% equipment and 80% people." Although eliminating the "human factor" is not possible, accounting for and mitigating the risk of the insider threat is an essential element in establishing an effective nuclear security culture. This paper will consider the organizational role in mitigating the risk associated with the malicious insider through monitoring and enhancing human reliability and motivation as well as enhancing the nuclear security culture.

  15. Self-Reliability and Motivation in a Nuclear Security Culture Enhancement Program

    SciTech Connect (OSTI)

    Crawford, Cary E.; de Boer, Gloria; De Castro, Kara; Landers, John; Rogers, Erin

    2010-10-01

    The threat of nuclear terrorism has become a global concern. Many countries continue to make efforts to strengthen nuclear security by enhancing systems of nuclear material protection, control, and accounting (MPC&A). Though MPC&A systems can significantly upgrade nuclear security, they do not eliminate the human factor. Gen. Eugene Habiger, a former Assistant Secretary for Safeguards and Security at the U.S. Department of Energys (DOE) nuclear-weapons complex and a former commander of U.S. strategic nuclear forces, has observed that good security is 20% equipment and 80% people.1 Although eliminating the human factor is not possible, accounting for and mitigating the risk of the insider threat is an essential element in establishing an effective nuclear security culture. This paper will consider the organizational role in mitigating the risk associated with the malicious insider through monitoring and enhancing human reliability and motivation as well as enhancing the nuclear security culture.

  16. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management approach that fosters low-growing plant communities.

  17. North American Synchrophasor Initiative (NASPI) Program Information |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Synchrophasor Initiative (NASPI) Program Information North American Synchrophasor Initiative (NASPI) Program Information Summary of the Transmission Reliability program's North American Synchrophasor Initiative (NASPI) activity area. NASPI supports industry adoption of next-generation monitoring equipment to increase reliability and reduce costs for consumers through the development of secure, highspeed, time-synchronized data about bulk power system conditions. Visit

  18. Efficient and Reliable Reactive Power Supply and Consumption --Insights from an Integrated Program of Engineering and EconomicResearch

    SciTech Connect (OSTI)

    Thomas, Robert J.; Mount, Timothy D.; Schuler, Richard; Schulze,William; Zimmerman, Ray; Alvarado, Fernando; Lesieutre, Bernard C.; Overholt, Philip N.; Eto, Joseph H.

    2008-01-01

    In 2005, the Federal Energy Regulatory Commission (FERC) began discussing regulatory policy for reactive-power procurement and pricing in competitive electricity markets. This paper summarizes findings from a unique, interdisciplinary program of public-interest research that lays a formal foundation for evaluating aspects of FERC staff recommendations and offers early insights that should be useful in guiding policy implementation, specifically by: (1) clarifying the consumers and economic characteristics of reactive power as a basis for creating incentives to appropriately price it, (2) defining specific challenges in creating a competitive market for reactive power as well as new tools needed to help ensure such a market functions efficiently, and (3) demonstrating the importance of accounting for the physical characteristics of the transmission network in planning for reactive power and avoiding the exercise of market power by suppliers.

  19. PROJECT PROFILE: An Integrated Tool for Improving Grid Performance and Reliability of Combined Transmission-Distribution with High Solar Penetration (SuNLaMP)

    Broader source: Energy.gov [DOE]

    High penetration of solar photovoltaics (PV) in electric power grids has created a need for changes to power system planning and operations analysis. Important technical issues such as two-way power flow, coordination of protection devices, transmission-distribution interaction, and reduction in inertia need to be resolved to enable a greater deployment of solar generation. To overcome these technical barriers, this project will develop a suite of software tools that creates a holistic understanding of the steady-state and transient behavior of transmission-distribution networks’ interaction under high PV penetration levels, along with the capability of real-time monitoring of the distribution systems and integration of system protection.

  20. Reliability Engineering

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    This document is approved for public release; further dissemination unlimited Reliability Engineering Reliability Engineering Current practice in reliability is often fragmented, ...

  1. Medical Aspects of Reliability

    SciTech Connect (OSTI)

    Atencio, Julian J.

    2014-05-05

    This presentation covers the medical evaluation as part of a human reliability program, particularly the various medical qualifications and potential disqualifiers.

  2. Lifetime and Reliability

    SciTech Connect (OSTI)

    2013-08-01

    Solid-state lighting program technology fact sheet that discusses failure, lifetime, and reliability as they relate to LED-based products.

  3. Reliability Engineering

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LA-UR 15-27450 This document is approved for public release; further dissemination unlimited Reliability Engineering Reliability Engineering Current practice in reliability is often fragmented, does not cover the full system lifecycle * Reliability needs to be addressed in design, development, and operational life * Reliability analysis should integrate information from components and systems Integrate proven reliability methods with world-class statistical science * Use methods and tools

  4. Environmental Recommendations for Transmission Planning | Open...

    Open Energy Info (EERE)

    generation resources, energy policies, technology costs, impacts on transmission reliability, and emissions is anticipated to facilitate collaborative and comprehensive...

  5. Vice President, Transmission System Operations

    Broader source: Energy.gov [DOE]

    The VP for Transmission System Operations provides strategic leadership, direction, and oversight of the people, business processes, and systems that are responsible for the safe, reliable, and...

  6. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission and Distribution Programs. | Department of Energy Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development

  7. July 24, 2009, Visiting Speakers Program - The Next Generation of Regulation for High-Reliability Organizations by HON. John Bresland

    Energy Savers [EERE]

    Next Generation of Regulation for High-Reliability Organizations National Academy of Public Administration Washington, DC July 24, 2009 John Bresland Chairman United States Chemical Safety Board www.csb.gov What is a High Reliability Organization? * Management commitment * The right equipment * The right people * Standard procedures and training * Accountability * Employee feedback * Emergency response preparation * Leadership - must "walk the walk" www.csb.gov 2 * 3 www.csb.gov Are

  8. North American Electric Reliability Corporation Interconnections |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability Corporation Interconnection showing the Eastern, Western, and Teaxs Interconnectins. PDF icon North American Electric Reliability Corporation Interconnections More Documents & Publications Interconnection Transmission Planning: Awards 2009 Electric Transmission Congestion Study Interested Parties - WAPA Public Comment

  9. Ensuring a Reliable Bulk Electric System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electric Reliability Corporation (NERC): Ensuring a Reliable Bulk Electric System Cooling Tower Report, October 2008 Transmission Constraints and Congestion in the Western...

  10. Office of Electricity Delivery And Energy Reliability To Hold...

    Office of Environmental Management (EM)

    Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission Office of Electricity Delivery And Energy Reliability To Hold Technical ...

  11. Sandia Energy - North American Electric Reliability Corporation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    North American Electric Reliability Corporation (NERC) Report Posted Home Energy Assurance Infrastructure Security Grid Integration News News & Events Transmission Grid Integration...

  12. 2014 Load as a Resource Program Peer Review

    Broader source: Energy.gov [DOE]

    The Transmission Reliability R&D Load as a Resource (LaaR) Program peer review included 2 roundtable discussions and 4 presentations on September 16, 2014 at Lawrence Berkeley National Lab. Agenda and presentations are available.

  13. Hawaii electric system reliability.

    SciTech Connect (OSTI)

    Silva Monroy, Cesar Augusto; Loose, Verne William

    2012-09-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  14. Transmission Infrastructure Program

    Office of Environmental Management (EM)

    standards TIP Portfolio Management Fundamentals * Reflective of Market Need(s) * ... to support stronger, bankable project fundamentals * Development Assistance is available ...

  15. Career Map: Power Systems/Transmission Engineer

    Broader source: Energy.gov [DOE]

    The Wind Program's Career Map provides job description information for Power Systems and Transmission Engineer positions.

  16. Transmission/Resource Library/Planning | Open Energy Information

    Open Energy Info (EERE)

    public utility transmission providers to meet future electricity demand and maintain reliability of the electric supply system. Transmission providing utilities must undergo...

  17. Ford Van Dyke: Compressed Air Management Program Leads to Improvements that Reduce Energy Consumption at an Automotive Transmission Plant

    SciTech Connect (OSTI)

    2010-06-25

    Staff at the Ford Van Dyke Transmission Plant in Sterling Heights, Michigan, have increased the efficiency of the plants compressed air system to enhance its performance while saving energy and improving production.

  18. Transmission Developers Inc.

    Energy Savers [EERE]

    ' % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of

  19. Office of Electricity Delivery and Energy Reliability Recovery...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity Delivery and Energy Reliability Recovery Program Plan Office of Electricity Delivery and Energy Reliability Recovery Program Plan PDF icon Microsoft Word - OE PSRP June ...

  20. Storage & Transmission Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CAPACITY ALL FIGURES AS OF MARCH 2015 STORAGE & TRANSMISSION PROJECT LOAN PROGRAM ... Transmission LS Power Associates, NV Energy & John Hancock Eastern Nevada Loan ...

  1. Energy Department, Arizona Utilities Announce Transmission Infrastructure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Energization | Department of Energy Arizona Utilities Announce Transmission Infrastructure Project Energization Energy Department, Arizona Utilities Announce Transmission Infrastructure Project Energization February 12, 2015 - 2:30pm Addthis News Media Contact 202 586 4940 DOENews@hq.doe.gov Energy Department, Arizona Utilities Announce Transmission Infrastructure Project Energization Transmission Line Increases Reliability, Access to Affordable Energy in Southwest States WASHINGTON

  2. Agenda: Electricity Transmission, Storage and Distribution- West

    Broader source: Energy.gov [DOE]

    The subject of transmission has many facets: its role in bulk power reliability, including how to maintain reliability with a changing resource mix; the planning, cost-allocation and state &...

  3. Exploring the Business Link Opportunity: Transmission & Clean...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West ... of Indian Energy and Office of Electricity Delivery and Energy Reliability was ...

  4. Blade Reliability Collaborative

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reliability Collaborative - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  5. North American Electric Reliability Corporation (NERC): Reliability...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (NERC): Reliability Considerations from the Integration of Smart Grid North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of ...

  6. Electric utility transmission and distribution upgrade deferral benefits from modular electricity storage : a study for the DOE Energy Storage Systems Program.

    SciTech Connect (OSTI)

    Eyer, James M.

    2009-06-01

    The work documented in this report was undertaken as part of an ongoing investigation of innovative and potentially attractive value propositions for electricity storage by the United States Department of Energy (DOE) and Sandia National Laboratories (SNL) Electricity Storage Systems (ESS) Program. This study characterizes one especially attractive value proposition for modular electricity storage (MES): electric utility transmission and distribution (T&D) upgrade deferral. The T&D deferral benefit is characterized in detail. Also presented is a generalized framework for estimating the benefit. Other important and complementary (to T&D deferral) elements of possible value propositions involving MES are also characterized.

  7. Transmission Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system

  8. Transmission Infrastructure Investment Projects (2009) | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Transmission Infrastructure Investment Projects (2009) More Documents & Publications Financial Institution Partnership Program - Commercial Technology Renewable Energy Generation...

  9. PV Performance and Reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance and Reliability - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  10. 2012 Reliability & Markets Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability & Markets Peer Review 2012 Reliability & Markets Peer Review The Transmission Reliability R&D Reliability & Markets Peer Review included 11 presentations over 2 days on August 7 - 8, 2012 at Cornell University in Ithaca, NY. Presentations and summaries are available through the links and the agenda is included below. Summaries | Full Presentations Day 1: August 7 Transmission Investment Assessment Under Uncertainty About Fuel Prices, Technology, Renewables Penetration

  11. Lifetime and Reliability | Department of Energy

    Energy Savers [EERE]

    Lifetime and Reliability Lifetime and Reliability A DOE Solid-State Lighting Program technology fact sheet on lifetime, reliability, and failure as related to LED-based products. PDF icon life-reliability_fact-sheet.pdf More Documents & Publications LED LUMINAIRE LIFETIME: Recommendations for Testing and Reporting LED Luminaire Lifetime: Recommendations For Testing and Reporting System Reliability Model for Solid-State Lighting Luminaires

  12. Transmission and Storage Operations

    Energy Savers [EERE]

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014 Agenda * DTE Gas Snapshot * NOx & CO - Combustion stability * Methane - Packing - Blowdowns * Capture vs Flare 2 SNAPSHOT * DTE Gas - 41 Units * Age Range: 8-59yrs (Average 45yrs) - 118,200HP * 1,000-15,000HP - 7 different manufacturers * Cooper-Bessemer, Solar, Waukesha, DeLaval, IR, CAT, Ariel - Complete Mixture *

  13. Transmission Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Grid Tech Team U.S. Department of Energy DOE Grid Tech Team (GTT) The Grid Tech Team ... regional diversity, AC-DC transmission and distribution solutions, ...

  14. North American Electric Reliability Corporation (NERC): Reliability

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Considerations from the Integration of Smart Grid | Department of Energy (NERC): Reliability Considerations from the Integration of Smart Grid North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid. NERC develops and enforces Reliability Standards; assesses adequacy annually via a ten-year forcast and winter and

  15. Continuous Reliability Enhancement for Wind (CREW) Database and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Continuous Reliability Enhancement for Wind (CREW) Database and Analysis Program HomeStationary PowerEnergy Conversion EfficiencyWind EnergyMaterials, Reliability, & Standards...

  16. Transmission decisions

    SciTech Connect (OSTI)

    Ellison, C.T. )

    1993-03-01

    As the US FERC moves forward to implement the transmission access provisions of the National Energy Policy Act of 1992, the debate over Regional Transmission Groups continues. Independent energy producers have much at stake in this debate and their reaction to the general RTG concept and to specific RTG proposals will weigh heavily in determining the fate of these proposals.

  17. 2012 Load as a Resource Program Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Load as a Resource Program Peer Review 2012 Load as a Resource Program Peer Review The Transmission Reliability R&D Load as a Resource (LAAR) Program peer review included 8 presentations on September 20, 2012 at Lawrence Berkeley National Lab. Agenda and presentations are below. PDF icon 2012 LAAR Program Peer Review - Agenda PDF icon 2012 LAAR Program Peer Review - Frequency Response Demand - Jeff Dagle, PNNL PDF icon 2012 LAAR Program Peer Review - Frequency Responsive Load Evaluation and

  18. Electricity Generation, Transmission and Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generation, Transmission and Energy Storage Systems Utilities and other electricity and transmission providers and regulators often require that equipment be proven safe and reliable before it is permitted on the grid. However, energy storage manufacturers and integrators are often unable to afford or provide the logistics necessary for this long-term testing and monitoring. The Energy Storage Test Pad (ESTP) in conjunction with the Energy Storage Analysis Laboratory (ESAL) provides trusted,

  19. 2012 Reliability & Markets Peer Review - Full Presentations | Department of

    Energy Savers [EERE]

    Energy Full Presentations 2012 Reliability & Markets Peer Review - Full Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 11 presentations over 2 days on August 7 - 8, 2012 at Cornell University in Ithaca, NY. The full presentations are available below. Presentation summaries are also available. PDF icon 2012 R&M Peer Review - Transmission Investment Assessment Under Uncertainty - Ben Hobbs PDF icon 2012 R&M Peer Review - Renewable

  20. 2012 Reliability & Markets Peer Review - Presentation Summaries |

    Energy Savers [EERE]

    Department of Energy Presentation Summaries 2012 Reliability & Markets Peer Review - Presentation Summaries The Transmission Reliability R&D Reliability & Markets Peer Review included 11 presentations over 2 days on August 7 - 8, 2012 at Cornell University in Ithaca, NY. Presentation summaries are available below. The full presentations are also available. PDF icon 2012 R&M Peer Review - Summary: Transmission Investment Under Uncertainty - Ben Hobbs PDF icon 2012 R&M Peer

  1. Microsoft Word - TRPR 2010 Public Document FINAL.docx

    Office of Environmental Management (EM)

    Transmission Reliability Program Peer Review i October 2010 Table of Contents Transmission Reliability Program Overview ......

  2. Electric Transmission Network: A Multi-Region Analysis, The

    Reports and Publications (EIA)

    2000-01-01

    This paper examines the ability of the existing transmission network to respond efficiently to increased trade over four reliability regions in the northeastern United States.

  3. EIS-0317: Kangley-Echo Lake Transmission Line Project

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

  4. Midwest Independent Transmission System Operator Smart Grid Project...

    Open Energy Info (EERE)

    to optimize the dispatch and operation of power plants while improving the reliability of the bulk transmission system. This project deploys phasor measurement units...

  5. Transmission Bottleneck Project Report. March 19, 2003 | Department of

    Energy Savers [EERE]

    Energy Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 The U.S. Department of Energy (DOE) National Transmission Grid Study (DOE 2002) determined that congestion in the U.S. electricity transmission system places daily constraints on electricity trade, increasing both electricity costs to consumers and impacts reliable operations. In an effort to support DOE's investigation of transmission bottlenecks, the Consortium for Electric Reliability

  6. Reliability Standards Owner

    Broader source: Energy.gov [DOE]

    This position is located in the Organizational Delivery and Performance organization of the Internal Operations Management Office (IOM), Transmission System Operations (TO), Transmission Services ...

  7. Transmission Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Services BPA Clarifications on the DSO216 1 Document updated on 2242015 at 3:29:25 PM B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Clarifications on...

  8. Blade Reliability Collaborative

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reliability Collaborative - Sandia Energy Energy Search Icon Sandia Home Locations Contact ... Twitter Google + Vimeo GovDelivery SlideShare Blade Reliability Collaborative Home...

  9. PV Reliability & Performance Model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reliability & Performance Model - Sandia Energy Energy Search Icon Sandia Home Locations ... Twitter Google + Vimeo GovDelivery SlideShare PV Reliability & Performance Model Home...

  10. Materials, Reliability, & Standards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Materials, Reliability, & Standards - Sandia Energy Energy Search Icon Sandia Home ... Twitter Google + Vimeo GovDelivery SlideShare Materials, Reliability, & Standards Home...

  11. Human Reliability Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reliability Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us ... Twitter Google + Vimeo GovDelivery SlideShare Human Reliability Assessment HomeStationary ...

  12. PV Performance and Reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance and Reliability - Sandia Energy Energy Search Icon Sandia Home Locations ... Twitter Google + Vimeo GovDelivery SlideShare PV Performance and Reliability Home...

  13. Grid Performance and Reliability | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Integration » Grid Performance and Reliability Grid Performance and Reliability 2 way power flow orange2.png As the solar industry moves towards achieving the SunShot Initiative goals, the electric power system must evolve to handle large-scale changes in transmission and distribution (T&D) planning and operations in order to accommodate increasing penetrations of distributed PV systems. Effectively interconnecting variable PV generation requires forward thinking and dynamic

  14. Trends In U.S. Electric Power Transmission

    SciTech Connect (OSTI)

    NONE

    2007-11-15

    The report provides an overview of the changes that are occurring in the industry to implement the goals of improved reliability and reduced congestion costs. As the electric industry works to become a more efficient market, transmission stands as a key link between the competitive generation and the regulated distribution sectors. In this role as a key link, transmission is a major focus of government efforts to improve reliability and reduce congestion costs. The scope of the report is to analyze the dominant reliability, investment, siting, and competition/open access trends that are occurring in the domestic electric transmission industry. Topics covered include: the impact of the 2003 Northeast blackout on reliability rules; the move from voluntary to mandatory reliability standards; the advent of real-time transmission system monitoring; ISO/RTO efforts to improve system reliability; the drivers of government intervention in transmission investment; the move towards incentive-based rates for transmission investment; legislative and regulatory efforts to spur transmission investment to support renewable energy resources; the emergence of merchant transmission; the need for federal backstop authority on regional transmission projects; the designation of national interest electric transmission corridors; FERC Orders on siting transmission; the need for changes in open access and competition regulations; FERC efforts to increase open access and competition; legislative efforts to increase competition; and, current competitive issues in the industry.

  15. Articles about Grid Integration and Transmission | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    about grid integration and transmission featured by the U.S. Department of Energy (DOE) Wind Program. September 16, 2015 Argonne National Laboratory Develops New Model to Quantify...

  16. Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Grid Integration - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  17. Energy Efficiency, Renewables, Advanced Transmission and Distribution

    Energy Savers [EERE]

    Technologies (2008) | Department of Energy Renewables, Advanced Transmission and Distribution Technologies (2008) Energy Efficiency, Renewables, Advanced Transmission and Distribution Technologies (2008) PDF icon Energy Efficiency, Renewables, Advanced Transmission and Distribution Technologies (2008) More Documents & Publications Financial Institution Partnership Program - Commercial Technology Renewable Energy Generation Projects Issued: October 7, 2009 Nuclear Power Facilities (2008)

  18. Regional Transmission Projects: Finding Solutions

    SciTech Connect (OSTI)

    The Keystone Center

    2005-06-15

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

  19. Transmission | Department of Energy

    Energy Savers [EERE]

    resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on...

  20. Transmission Business Line

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Business Line Non-Federal Financing of Transmission Projects - March 2004 Critical paths on the Northwest transmission grid are congested and the system is near or at...

  1. NREL Publishes Gearbox Reliability Collaborative Findings Report |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Publishes Gearbox Reliability Collaborative Findings Report NREL Publishes Gearbox Reliability Collaborative Findings Report October 3, 2011 - 12:56pm Addthis This is an excerpt from the Third Quarter 2011 edition of the Wind Program R&D Newsletter. In June, DOE's National Renewable Energy Laboratory (NREL) published the first formal report on the efforts of the Gearbox Reliability Collaborative (GRC) to address a major challenge for the wind energy industry-gearbox

  2. Final Report Navajo Transmission Project (NTP)

    SciTech Connect (OSTI)

    Bennie Hoisington; Steven Begay

    2006-09-14

    The Din Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

  3. Coming Full Circle in Florida: Improving Electric Grid Reliability and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Resiliency | Department of Energy Coming Full Circle in Florida: Improving Electric Grid Reliability and Resiliency Coming Full Circle in Florida: Improving Electric Grid Reliability and Resiliency May 2, 2013 - 11:16am Addthis Inside Florida Power & Light's Transmission Performance Diagnostic Center. | Photo courtesy of Florida Power & Light. Inside Florida Power & Light's Transmission Performance Diagnostic Center. | Photo courtesy of Florida Power & Light. In 2009, at the

  4. DOE Transmission Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Order No. 1000 Transmission Ratemaking Enabling New Resources - Demand Response - Variable Generation - Storage 2 Stages of Transmission Planning - Local, ...

  5. Recovery Act Interconnection Transmission Planning

    Broader source: Energy.gov [DOE]

    Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

  6. Annual U.S. Transmission Data Review - 2015 | Department of Energy

    Energy Savers [EERE]

    Annual U.S. Transmission Data Review - 2015 Annual U.S. Transmission Data Review - 2015 The Office of Electricity Delivery and Energy Reliability has released the Annual U.S. Transmission Data Review, its annual compilation of transmission-related data focusing on six areas: transmission infrastructure, reliability, utilization, constraints, planning, and economic congestion. This data, which is gathered from publicly-available sources, is used to inform various DOE analyses, including OE's

  7. Annual U.S. Transmission Data Review Now Available | Department of Energy

    Energy Savers [EERE]

    Annual U.S. Transmission Data Review Now Available Annual U.S. Transmission Data Review Now Available August 27, 2015 - 5:20pm Addthis The Office of Electricity Delivery and Energy Reliability has released the Annual U.S. Transmission Data Review, its annual compilation of transmission-related data focusing on six areas: transmission infrastructure, reliability, utilization, constraints, planning, and economic congestion. This data, which is gathered from publicly-available sources, is used to

  8. Hydromechanical transmission

    DOE Patents [OSTI]

    Orshansky, Jr. deceased, Elias; Weseloh, William E.

    1978-01-01

    A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

  9. NREL: Performance and Reliability R&D - PV Module Reliability...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Reliability R&D Photovoltaics Research Performance Reliability R and D Printable Version PV Module Reliability Workshop NREL hosts an annual Photovoltaic Module...

  10. Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.

    SciTech Connect (OSTI)

    Eyer, James M. (Distributed Utility Associates, Livermore, CA); Butler, Paul Charles; Iannucci, Joseph J., Jr.

    2005-11-01

    This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.

  11. 2013 Reliability & Markets Peer Review - Day 1 Presentations | Department

    Energy Savers [EERE]

    of Energy 1 Presentations 2013 Reliability & Markets Peer Review - Day 1 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 6 - 7, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Ben Hobbs (Johns Hopkins), Kameshwar Poolla (UC Berkeley) Session II: Ray Zimmerman (Cornell), Hsiao-Dong Chiang (Cornell) Session III: Shmuel Oren (UC Berkeley), Dan Tylavsky (U Arizona), Tom

  12. 2013 Reliability & Markets Peer Review - Day 2 Presentations | Department

    Energy Savers [EERE]

    of Energy 2 Presentations 2013 Reliability & Markets Peer Review - Day 2 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 6 - 7, 2013. Presentations from Day 2 (Sessions V and VI) are available below. Session V: Tim Mount (Cornell), Bill Schulze (Cornell), Lang Tong (Cornell) Session VI: Max Zhang (Cornell) PDF icon 2013 R&M Peer Review - Evaluating the Effects of Managing Controllable Demand and

  13. 2014 Reliability & Markets Peer Review - Day 1 Presentations | Department

    Energy Savers [EERE]

    of Energy 1 Presentations 2014 Reliability & Markets Peer Review - Day 1 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 5 - 6, 2014. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Ray Zimmerman, Bill Schulze, Rim Mount Session II: Hsiao-Dong Chiang, Zhifang Wang Session III: Ben Hobbs, Alejandro Dominguez-Garcia, Lang Tong Session IV: Lindsay Anderson, Kory Hedman PDF

  14. Comments on RFI on Permitting of Transmission Lines Available | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Comments on RFI on Permitting of Transmission Lines Available Comments on RFI on Permitting of Transmission Lines Available April 3, 2012 - 2:12pm Addthis On October 5, 2011, the White House announced the creation of a Rapid Response Team for Transmission (RRTT). In support of the RRTT the Department of Energy's Office of Electricity Delivery and Energy Reliability released a Federal Register Notice seeking information on questions related to permitting of transmission lines. The

  15. DOE Seeking Information on Transmission Line Permitting | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Seeking Information on Transmission Line Permitting DOE Seeking Information on Transmission Line Permitting February 27, 2012 - 3:25pm Addthis The Department of Energy's Office of Electricity Delivery and Energy Reliability is seeking information on the questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local, and Tribal authorizations and are

  16. 2015 National Electric Transmission Congestion Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Electric Transmission Congestion Study 2015 National Electric Transmission Congestion Study Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C. 824p(a), directs the Secretary of Energy to conduct an electric transmission congestion study every three years, and to prepare it in consultation with affected states and regional reliability organizations. In the study, the Department seeks to provide information about transmission congestion. The Department has published

  17. Reliability Question Comment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reliability-Question-Comment Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives...

  18. Technique for Measuring Hybrid Electronic Component Reliability

    SciTech Connect (OSTI)

    Green, C.C.; Hernandez, C.L.; Hosking, F.M.; Robinson, D.; Rutherford, B.; Uribe, F.

    1999-01-01

    Materials compatibility studies of aged, engineered materials and hardware are critical to understanding and predicting component reliability, particularly for systems with extended stockpile life requirements. Nondestructive testing capabilities for component reliability would significantly enhance lifetime predictions. For example, if the detection of crack propagation through a solder joint can be demonstrated, this technique could be used to develop baseline information to statistically determine solder joint lifelengths. This report will investigate high frequency signal response techniques for nondestructively evaluating the electrical behavior of thick film hybrid transmission lines.

  19. RAPID/BulkTransmission/Transmission Siting & Interconnection...

    Open Energy Info (EERE)

    federal review). Bulk Transmission Transmission Siting & Interconnection in New Mexico New Mexico Statutes (N.M.S.) 62-9-1, 62-9-3(B), and 62-9-3.2 No Location Permit may be...

  20. Reliability of Bonded Interfaces

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  1. Thermoelectric Mechanical Reliability

    Broader source: Energy.gov [DOE]

    2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  2. Reliability of Electrical Interconnects

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  3. Self-Reliability and Motivation in a Nuclear Security Culture...

    Office of Scientific and Technical Information (OSTI)

    and Motivation in a Nuclear Security Culture Enhancement Program Citation Details In-Document Search Title: Self-Reliability and Motivation in a Nuclear Security Culture ...

  4. Project Profile: Physics-Based Reliability Models for Supercritical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Abengoa logo GE, under the Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar (PREDICTS) Program will be leveraging internally developed models ...

  5. 2015 National Electric Transmission Congestion Study Now Available

    Broader source: Energy.gov [DOE]

    The Office of Electricity Delivery and Energy Reliability has released the 2015 National Electric Transmission Congestion Study. Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C. 824p(a), directs the Secretary of Energy to conduct an electric transmission congestion study every three years, and to prepare it in consultation with affected states and regional reliability organizations. The Study released today seeks to provide information about transmission congestion by focusing on specific indications of transmission constraints and congestion and their consequences. It focuses primarily on historical trends over the past few years, and looks into the future to the extent possible.

  6. Transmission Capacity Forum

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Email Address: Name: Organization Entity Type: Select the best fit for your role... Energy Trader Transmission Provider Employee Transmission Purchaser Energy Scheduler...

  7. DOE's Tribal Energy Program

    Office of Environmental Management (EM)

    Office * Electricity Delivery & Energy Reliability * Energy Efficiency & Renewable Energy * Environmental Management * Fossil Energy * Indian Energy Policy and Programs * ...

  8. Programming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Programming Programming Compiling and linking programs on Euclid. Compiling Codes How to compile and link MPI codes on Euclid. Read More » Using the ACML Math Library How to compile and link a code with the ACML library and include the $ACML environment variable. Read More » Process Limits The hard and soft process limits are listed. Read More » Last edited: 2016-04-29 11:35:11

  9. Programming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Programming Programming Compiling Codes on Hopper Cray provides a convenient set of wrapper commands that should be used in almost all cases for compiling and linking parallel programs. Invoking the wrappers will automatically link codes with the MPI libraries and other Cray system software libraries. All the MPI and Cray system include directories are also transparently imported. This page shows examples of how to compile codes on Franklin and Hopper. Read More » Shared and Dynamic Libraries

  10. Sandia Energy - Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Grid Integration Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Grid Integration Transmission Grid Integration Transmission Grid...

  11. Human Reliability Program- Tools for Clinicians

    Broader source: Energy.gov [DOE]

    Medications that require reporting and Medical Records Checklist that will assist providers in obtaining documentation necessary for making eligibility determination.

  12. Scalable Program Analyses to Improve Software Reliability!

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is dropped Error-Code Mismatches Dropped Errors Misused Error-Valued Pointers Error Prop Analysis ... SOURCE CODE EPERM 1 EIO 5 ENOMEM 12 .... ERROR HANDLING SPECS Static...

  13. Human Reliability Program Orientation for Employees (Technical...

    Office of Scientific and Technical Information (OSTI)

    DOE Contract Number: DE-AC05-06OR23100 Resource Type: Technical Report Research Org: Oak Ridge Institute for Science and Education (ORISE), Oak Ridge, TN Sponsoring Org: USDOE - ...

  14. Reliability and Safety

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE solar reliability and safety research and development (R&D) focuses on testing photovoltaic (PV) modules, inverters, and systems for long-term performance, and helping investors, consumers,...

  15. RAPID/BulkTransmission/New Mexico | Open Energy Information

    Open Energy Info (EERE)

    PNM collaborates with the agency WestConnect to accomplish transmission planning and reliability. Through WestConnect, PNM has joined together with utilities to the west and north...

  16. 2012 Transmission and Energy Storage Peer Review Presentations Available

    Broader source: Energy.gov [DOE]

    Presentations from theTransmission Reliability R&D Load as a Resource peer review and Energy Storage Systems peer review, both held in September 2012, are now available.

  17. DOE Lab Releases Wind Turbine Reliability Benchmark Report | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Lab Releases Wind Turbine Reliability Benchmark Report DOE Lab Releases Wind Turbine Reliability Benchmark Report October 1, 2012 - 1:17pm Addthis This is an excerpt from the Third Quarter 2012 edition of the Wind Program R&D Newsletter. The U.S. Department of Energy's Sandia National Laboratories (SNL) recently released its second annual public benchmark report for the Continuous Reliability Enhancement for Wind (CREW) database. CREW is a national reliability database that

  18. The Modern Grid Strategy THE TRANSMISSION SMART GRID IMPERATIVE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modern Grid Strategy THE TRANSMISSION SMART GRID IMPERATIVE Developed for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability by the National Energy Technology Laboratory September 2009 Office of Electricity Delivery and Energy Reliability Transmission Smart Grid Imperative 1 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their

  19. Programming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    using MPI and OpenMP on NERSC systems, the same does not always exist for other supported parallel programming models such as UPC or Chapel. At the same time, we know that these...

  20. Programming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    provided on the Cray systems at NERSC. The Programming Environment is managed by a meta-module named similar to "PrgEnv-gnu4.6". The "gnu" indicates that it is providing the...

  1. Photovoltaic module reliability workshop

    SciTech Connect (OSTI)

    Mrig, L.

    1990-01-01

    The paper and presentations compiled in this volume form the Proceedings of the fourth in a series of Workshops sponsored by Solar Energy Research Institute (SERI/DOE) under the general theme of photovoltaic module reliability during the period 1986--1990. The reliability Photo Voltaic (PV) modules/systems is exceedingly important along with the initial cost and efficiency of modules if the PV technology has to make a major impact in the power generation market, and for it to compete with the conventional electricity producing technologies. The reliability of photovoltaic modules has progressed significantly in the last few years as evidenced by warranties available on commercial modules of as long as 12 years. However, there is still need for substantial research and testing required to improve module field reliability to levels of 30 years or more. Several small groups of researchers are involved in this research, development, and monitoring activity around the world. In the US, PV manufacturers, DOE laboratories, electric utilities and others are engaged in the photovoltaic reliability research and testing. This group of researchers and others interested in this field were brought together under SERI/DOE sponsorship to exchange the technical knowledge and field experience as related to current information in this important field. The papers presented here reflect this effort.

  2. 10 Year Transmission Plan for the Western Electricity Interconnection Released

    Broader source: Energy.gov [DOE]

    The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities.

  3. Gearbox Reliability Collaborative Update (Presentation)

    SciTech Connect (OSTI)

    Sheng, S.

    2013-10-01

    This presentation was given at the Sandia Reliability Workshop in August 2013 and provides information on current statistics, a status update, next steps, and other reliability research and development activities related to the Gearbox Reliability Collaborative.

  4. GRANITE RELIABLE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GRANITE RELIABLE GRANITE RELIABLE PDF icon DOE-LPO_Project-Posters_WIND_Granite-Reliable.pdf More Documents & Publications USG OREGON EA-1801: Finding of No Significant Impact DOE-LPO_Outreach_LPO-Overview_CSP

  5. Sandia Energy - PV Systems Reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Systems Reliability Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics PV Systems Reliability PV Systems ReliabilityCoryne Tasca2015-05-08T03:40:54+00:00...

  6. CERTS: Consortium for Electric Reliability Technology Solutions - Research Highlights

    SciTech Connect (OSTI)

    Eto, Joseph

    2003-07-30

    Historically, the U.S. electric power industry was vertically integrated, and utilities were responsible for system planning, operations, and reliability management. As the nation moves to a competitive market structure, these functions have been disaggregated, and no single entity is responsible for reliability management. As a result, new tools, technologies, systems, and management processes are needed to manage the reliability of the electricity grid. However, a number of simultaneous trends prevent electricity market participants from pursuing development of these reliability tools: utilities are preoccupied with restructuring their businesses, research funding has declined, and the formation of Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs) to operate the grid means that control of transmission assets is separate from ownership of these assets; at the same time, business uncertainty, and changing regulatory policies have created a climate in which needed investment for transmission infrastructure and tools for reliability management has dried up. To address the resulting emerging gaps in reliability R&D, CERTS has undertaken much-needed public interest research on reliability technologies for the electricity grid. CERTS' vision is to: (1) Transform the electricity grid into an intelligent network that can sense and respond automatically to changing flows of power and emerging problems; (2) Enhance reliability management through market mechanisms, including transparency of real-time information on the status of the grid; (3) Empower customers to manage their energy use and reliability needs in response to real-time market price signals; and (4) Seamlessly integrate distributed technologies--including those for generation, storage, controls, and communications--to support the reliability needs of both the grid and individual customers.

  7. Electricity Delivery and Energy Reliability

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Delivery and Energy Reliability The Office of Electricity Delivery and Energy Reliability ... to energy supply disruptions, such as electricity and fuel outages. * Smart Grid (14.4 ...

  8. Measurement Practices for Reliability and Power Quality

    SciTech Connect (OSTI)

    Kueck, JD

    2005-05-06

    This report provides a distribution reliability measurement ''toolkit'' that is intended to be an asset to regulators, utilities and power users. The metrics and standards discussed range from simple reliability, to power quality, to the new blend of reliability and power quality analysis that is now developing. This report was sponsored by the Office of Electric Transmission and Distribution, U.S. Department of Energy (DOE). Inconsistencies presently exist in commonly agreed-upon practices for measuring the reliability of the distribution systems. However, efforts are being made by a number of organizations to develop solutions. In addition, there is growing interest in methods or standards for measuring power quality, and in defining power quality levels that are acceptable to various industries or user groups. The problems and solutions vary widely among geographic areas and among large investor-owned utilities, rural cooperatives, and municipal utilities; but there is still a great degree of commonality. Industry organizations such as the National Rural Electric Cooperative Association (NRECA), the Electric Power Research Institute (EPRI), the American Public Power Association (APPA), and the Institute of Electrical and Electronics Engineers (IEEE) have made tremendous strides in preparing self-assessment templates, optimization guides, diagnostic techniques, and better definitions of reliability and power quality measures. In addition, public utility commissions have developed codes and methods for assessing performance that consider local needs. There is considerable overlap among these various organizations, and we see real opportunity and value in sharing these methods, guides, and standards in this report. This report provides a ''toolkit'' containing synopses of noteworthy reliability measurement practices. The toolkit has been developed to address the interests of three groups: electric power users, utilities, and regulators. The report will also serve to support activities to develop and share information among industry and regulatory participants about critical resources and practices. The toolkit has been developed by investigating the status of indices and definitions, surveying utility organizations on information sharing, and preparing summaries of reliability standards and monitoring requirements--the issues, needs, work under way, existing standards, practices and guidelines--for the following three classifications: (1) terms and definitions of reliability; (2) power quality standards, guidelines, and measurements; and (3) activities and organizations developing and sharing information on distribution reliability. As these synopses of reliability measurement practices are provided, it must be noted that an economic penalty may be associated with requiring too high a reliability level from the distribution system for all customers. It may be appropriate for the distribution system to supply only some base, generally accepted level of reliability. This base level would be adequate for the majority of customers. Users who need a higher level may find it economical to supply using distributed energy resources (DER) and other local solutions to reliability and power quality needs. Local solutions implemented by the customer may be the most cost-effective method for addressing the more stringent needs of a digital economy. These local solutions include energy storage, small distributed generators, and microgrids. This report also considers the market's role in addressing reliability issues and requirements. The customer's needs are discussed in view of issues such as power quality requirements of digital electronic equipment, the cost of outages, the cost of storage and new infrastructure, and natural gas prices. The market role in addressing these issues and requirements is explored. The economic considerations associated with the reliability issues are discussed, as well as the levels at which these economic decisions could be made. Finally, a discussion is provided of the role DER could play in addressing reliability needs, and the possible role of the market in providing needed levels of reliability.

  9. EA-1982: Parker-Davis Transmission System Routine Operation and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Program EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance ...

  10. Real Time Grid Reliability Management 2005

    SciTech Connect (OSTI)

    Eto, Joe; Eto, Joe; Lesieutre, Bernard; Lewis, Nancy Jo; Parashar, Manu

    2008-07-07

    The increased need to manage California?s electricity grid in real time is a result of the ongoing transition from a system operated by vertically-integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management -- construction of new transmission lines -- has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools. This project: (1) developed and conducted first-ever demonstrations of two prototype real-time software tools for voltage security assessment and phasor monitoring; and (2) prepared a scoping study on improving load and generator response models. Additional funding through two separate subsequent work authorizations has already been provided to build upon the work initiated in this project.

  11. 2015 National Electric Transmission Congestion Study

    Broader source: Energy.gov [DOE]

    Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C. 824p(a), directs the Secretary of Energy to conduct an electric transmission congestion study every three years, and to prepare it in consultation with affected states and regional reliability organizations. In the study, the Department seeks to provide information about transmission congestion by focusing on specific indications of transmission constraints and congestion and their consequences. The study focuses on a specific time frame – e.g., historical trends over the past few years, and looking forward three to five years. The study is based entirely on publicly-available data and transmission-related documents. The Department has published two previous congestion studies, one in 2006 and another in 2009.

  12. North American Electric Reliability Council Power Outage Update |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Power Outage Update North American Electric Reliability Council Power Outage Update The bulk electric transmission system in the United States and Canada has been restored and is operating reliably. Many of the generating units that tripped off line during the outage have returned to service and additional generating units are expected to return to service over the weekend. Virtually all customers have been returned to electric service, although some customers will

  13. Advancing Visibility of Grid Operations to Improve Reliability | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Visibility of Grid Operations to Improve Reliability Advancing Visibility of Grid Operations to Improve Reliability June 6, 2014 - 1:30pm Addthis David Ortiz David Ortiz Former Deputy Assistant Secretary, Energy Infrastructure Modeling and Analysis The nation's electricity transmission system, which consists of three grids (one in the West, one in the East, and one in Texas), is one of the biggest and most complex machines ever constructed. Commonly referred to as "the

  14. Transmission SEAB Presentation

    Broader source: Energy.gov (indexed) [DOE]

    Market Power 368 Corridors ... evaluation of transmission applications Increase efficiency in administration ... MATL Project New t-line Financier Minority ...

  15. Transmission Siting_071508.indd

    Energy Savers [EERE]

    Transmission SEAB Presentation Transmission SEAB Presentation PDF icon Transmission SEAB Presentation More Documents & Publications Before House Natural Resources Committee QER - Comment of American Public Power Association 5 Before the House Committee on Natural Resources

    Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of

  16. Coiled transmission line pulse generators

    DOE Patents [OSTI]

    McDonald, Kenneth Fox

    2010-11-09

    Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

  17. Rebate Program Serves Alaskans with Disabilities | Department of Energy

    Energy Savers [EERE]

    Ratepayer-Funded Energy Efficiency Ratepayer-Funded Energy Efficiency INTRODUCTION The Office of Electricity Delivery and Energy Reliability (OE) is committed to helping States that wish to change their electricity polices, laws, and regulations. We offer expertise on both supply-side, transmission and demand-side solutions. Demand-side solutions include energy efficiency that is delivered to electricity ratepayers. Since the early 1990s, first through its predecessor programs and now since 2003

  18. DOE … NETL Internal Program Review … June 10, 2010

    Energy Savers [EERE]

    10-11, 2015 │ Embassy Suites Crystal City Agenda Wednesday, June 10 (Day 1) Welcome, Introductions, DOE remarks Joe Eto, Lawrence Berkeley National Laboratory Phil Overholt, US DOE, OE Transmission Reliability Program SESSION I (all sessions allow 20 minutes for presentations/10 minutes for Q&A) 1 Measurement-Based Stability Assessment Dan Trudnowski, Montana Tech 2 Application of VARPRO Ambient Mode Estimation Bernie Lesieutre, University of Wisconsin 3 WSU Oscillation project Mani

  19. Wireless power transmission: The key to solar power satellites

    SciTech Connect (OSTI)

    Nansen, R.H.

    1995-12-31

    In the years following the OPEC oil embargo of 1973--74, the US aggressively researched alternative energy options. Among those studied was the concept of Solar Power Satellites -- generating electricity in space from solar energy on giant satellites and sending the energy to the earth with wireless power transmission. Much has happened in the fifteen years since the studies were terminated. Maturing of the enabling technologies has provided much of the infrastructure to support the development of a commercial Solar Power Satellite program. All of this will reduce the cost by one to two orders of magnitude so development can now be undertaken by industry instead of relying on a massive government program. Solar Space Industries was formed to accomplish this goal. The basis of their development plan for Solar Power Satellites is to build a Ground Test Installation that will duplicate, in small scale on the earth, all aspects of the power generating and power transmission systems for the Solar Power Satellite concept except for the space environment and the range and size of the energy beam. Space operations issues will be separated from the power generation function and verified by testing using the NASA Space Station and Space Shuttle. Solar Space Industries` concept is to built a Ground Test Installation that couples an existing 100 kW terrestrial solar cell array, furnished by an interested utility, to a phased-array wireless power transmitter based on the subarray developed by William Brown and The Center for Space Power. Power will be transmitted over a 1 1/4 mile range to a receiving antenna (rectenna) and then fed into a commercial utility power grid. The objective is to demonstrate the complete function of the Solar Power Satellites, with the primary issue being the validation of practical wireless power transmission. The key features to demonstrate are; beam control, stability, steering, efficiency, reliability, cost, and safety.

  20. Reliability of Electrical Interconnects (Presentation)

    SciTech Connect (OSTI)

    Devoto, D.

    2014-06-01

    This presentation discusses the status of NREL's research on the reliability of electrical interconnects.

  1. Thermoelectric Mechanical Reliability

    Broader source: Energy.gov [DOE]

    2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting, June 7-11, 2010 -- Washington D.C.

  2. Automated manual transmission controller

    DOE Patents [OSTI]

    Lawrie, Robert E.; Reed, Jr., Richard G.; Bernier, David R.

    1999-12-28

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  3. 2014 Reliability & Markets Peer Review - Day 2 Presentations | Department

    Energy Savers [EERE]

    of Energy 2 Presentations 2014 Reliability & Markets Peer Review - Day 2 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 5 - 6, 2014. Presentations from Day 2 (Sessions V and VI) are available below. Session V: Shmuel Oren, HyungSeon Oh, Tom Overbye Session VI: Dan Tylavsky, Eilyan Bitar PDF icon 2014 R&M Peer Review - Business Model for Retail Aggregation of Responsive Load - Shmuel Oren PDF icon 2014

  4. 2015 Reliability & Markets Peer Review - Day 2 Presentations | Department

    Energy Savers [EERE]

    of Energy 2 Presentations 2015 Reliability & Markets Peer Review - Day 2 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 4 - 5, 2015. Presentations from Day 2 (Sessions V through VI) are available below. Session V: Ray Zimmerman, Hsiao-Dong Chiang, Lindsay Anderson Session VI: HyungSeon Oh, Dan Tylavsky PDF icon 2015 R&M Peer Review - Development and testing of tools - Ray Zimmerman PDF icon 2015

  5. Lab works on new model for HIV transmission and evolution

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    works on new model for HIV transmission and evolution Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:May 2016 all issues All Issues » submit Lab works on new model for HIV transmission and evolution Mutates at different rates in different populations February 1, 2014 Lab works on new model for HIV transmission and evolution Lab works on new model for HIV transmission and evolution Contacts Community Programs Office Director Kurt

  6. Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38- Feb. 27, 2012

    Broader source: Energy.gov [DOE]

    The Department of Energy’s Office of Electricity Delivery and Energy Reliability requested information on questions related to permitting of transmission lines. Infrastructure projects — such as...

  7. Fault Tree Reliability Analysis and Design-for-reliability

    Energy Science and Technology Software Center (OSTI)

    1998-05-05

    WinR provides a fault tree analysis capability for performing systems reliability and design-for-reliability analyses. The package includes capabilities for sensitivity and uncertainity analysis, field failure data analysis, and optimization.

  8. EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

  9. NREL: Performance and Reliability R&D - Photovoltaic Performance and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reliability Workshops Photovoltaic Performance and Reliability Workshops NREL hosts workshops focused on photovoltaic (PV) performance and reliability to encourage collaboration and communication among solar program staff, national laboratory teams, and industry partners. Workshop summaries and presentation content are available for the following meetings. NREL also coordinates an annual Photovoltaic Module Reliability Workshop (PVMRW) so that solar technology experts can share information

  10. Dynamic Line Rating Oncor Electric Delivery Smart Grid Program

    SciTech Connect (OSTI)

    Johnson, Justin; Smith, Cale; Young, Mike; Donohoo, Ken; Owen, Ross; Clark, Eddit; Espejo, Raul; Aivaliotis, Sandy; Stelmak, Ron; Mohr, Ron; Barba, Cristian; Gonzalez, Guillermo; Malkin, Stuart; Dimitrova, Vessela; Ragsdale, Gary; Mitchem, Sean; Jeirath, Nakul; Loomis, Joe; Trevino, Gerardo; Syracuse, Steve; Hurst, Neil; Mereness, Matt; Johnson, Chad; Bivens, Carrie

    2013-05-04

    Electric transmission lines are the lifeline of the electric utility industry, delivering its product from source to consumer. This critical infrastructure is often constrained such that there is inadequate capacity on existing transmission lines to efficiently deliver the power to meet demand in certain areas or to transport energy from high-generation areas to high-consumption regions. When this happens, the cost of the energy rises; more costly sources of power are used to meet the demand or the system operates less reliably. These economic impacts are known as congestion, and they can amount to substantial dollars for any time frame of reference: hour, day or year. There are several solutions to the transmission constraint problem, including: construction of new generation, construction of new transmission facilities, rebuilding and reconductoring of existing transmission assets, and Dynamic Line Rating (DLR). All of these options except DLR are capital intensive, have long lead times and often experience strong public and regulatory opposition. The Smart Grid Demonstration Program (SGDP) project co-funded by the Department of Energy (DOE) and Oncor Electric Delivery Company developed and deployed the most extensive and advanced DLR installation to demonstrate that DLR technology is capable of resolving many transmission capacity constraint problems with a system that is reliable, safe and very cost competitive. The SGDP DLR deployment is the first application of DLR technology to feed transmission line real-time dynamic ratings directly into the system operation’s State Estimator and load dispatch program, which optimizes the matching of generation with load demand on a security, reliability and economic basis. The integrated Dynamic Line Rating (iDLR)1 collects transmission line parameters at remote locations on the lines, calculates the real-time line rating based on the equivalent conductor temperature, ambient temperature and influence of wind and solar radiation on the stringing section, transmits the data to the Transmission Energy Management System, validates its integrity and passes it on to Oncor and ERCOT (Electric Reliability Council of Texas) respective system operations. The iDLR system is automatic and transparent to ERCOT System Operations, i.e., it operates in parallel with all other system status telemetry collected through Supervisory Control and Data Acquisition (SCADA) employed across the company.

  11. NREL: Photovoltaics Research - NREL Hosts PV Module Reliability Workshop

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Industry Hosts PV Module Reliability Workshop for Industry March 1, 2016 Nearly 200 researchers from more than 100 companies and representing 16 countries attended the 7th annual PV Module Reliability Workshop, held Feb. 23-25, 2016, in Golden, Colo. The program was designed by the National Renewable Energy Laboratory (NREL) in collaboration with Sandia National Laboratories and the photovoltaic (PV) industry. "NREL's PV Module Reliability Workshop is unique in its requirement for

  12. NREL: Solar Research - NREL Hosts PV Module Reliability Workshop for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Industry NREL Hosts PV Module Reliability Workshop for Industry March 1, 2016 Nearly 200 researchers from more than 100 companies and representing 16 countries attended the 7th annual PV Module Reliability Workshop, held Feb. 23-25, 2016, in Golden, Colo. The program was designed by the National Renewable Energy Laboratory (NREL) in collaboration with Sandia National Laboratories and the photovoltaic (PV) industry. "NREL's PV Module Reliability Workshop is unique in its requirement for

  13. Gearbox Reliability Collaborative Debuts on the Web | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gearbox Reliability Collaborative Debuts on the Web Gearbox Reliability Collaborative Debuts on the Web May 1, 2012 - 3:42pm Addthis This is an excerpt from the Second Quarter 2012 edition of the Wind Program R&D Newsletter. Premature gearbox failures have a significant impact on the cost of wind farm operations. In 2007, the Energy Department's National Renewable Energy Laboratory (NREL) initiated the Gearbox Reliability Collaborative (GRC). The project combines analysis, field testing,

  14. Transmission Planning Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identifymore » weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.« less

  15. NREL: Performance and Reliability R&D - Photovoltaic Reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Publications Photovoltaic Reliability Publications Sign up for NREL PV Reliability and Performance updates today! NREL publishes photovoltaic (PV) reliability journal articles, technical reports, conference papers, and outreach documents. Explore a sampling of our most recent or often-cited publications on PV reliability topics. The following NREL publications can be found on the following topics by clicking on the names of the researchers below. Accelerated Testing and Failure Analysis Nick

  16. Series Transmission Line Transformer

    DOE Patents [OSTI]

    Buckles, Robert A.; Booth, Rex; Yen, Boris T.

    2004-06-29

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  17. Transmission - Contact Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact-Information-Transmission Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  18. Electrical Engineer- Transmission Lines

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration, Upper Great Plains Region, Maintenance, North Dakota Maintenance, Transmission...

  19. Current Transmission Rates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases Rate Information Current Power Rates Current Transmission Rates...

  20. Previous Transmission Rates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases Rate Information Current Power Rates Current Transmission Rates...

  1. National Transmission Grid Study

    Office of Environmental Management (EM)

    ... to meet present demand, daily transmission constraints or ... stations located close to fuel supplies or needed ... the Southwest Power Pool within the Eastern Interconnection. ...

  2. Electricity Transmission, A Primer

    Energy Savers [EERE]

    ... Biomass plants are best built near their source of fuel for ... the transmission grid by an authorized scheduling utility. ... Power Pool: Two or more inter- connected electric systems ...

  3. 2012 Transmission Rate Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Transmission, Ancillary, and Control Area Service Rate Schedules and General Rate Schedule Provisions (FY 2014-2015) October 2013 United States Department of Energy...

  4. Collaborative Transmission Technology Roadmap

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Addendum to the Collaborative Transmission Technology Roadmap March 2014 Bonneville Power Administration Enhanced PDF Functionality Functionality of the PDF version of this...

  5. Corrosion resistance of transmission structures fabricated from weathering steel

    SciTech Connect (OSTI)

    Goodwin, E.J. ); Pohlman, J.C.

    1993-01-01

    Introduced to utilities in the late 1960's, weathering steel' appeared to offer a way to reduce structure weight and maintenance of lattice towers through the application of bare, high strength steel that had natural corrosion resistance. Weathering steel found wide application in lattice and tubular transmission structures. Through its service life, however, the weathering steel showed evidence of continuing corrosion rather than the expected protection from corrosion. A consortium of utilities was formed to investigate the impact on structure reliability of the continuing corrosion of the steel beyond initial expectations. Through the completion of field surveys and laboratory tests, projected lifetime corrosion rates, structural integrity and potential sealer/penetrant systems were evaluated. The investigation has shown that existing lattice and tubular structures fabricated from weathering steel will provide continued reliable service with minimal maintenance programs. Weathering Steel remains practical for new lattice and tubular structures provided steps are taken during the design process to minimize the retention and collection of moisture between and around metal contact surfaces and during the operation of the line to minimize vegetation encroachment around structures.

  6. PV Performance and Reliability Validation Capabilities at Sandia National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laboratories | Department of Energy Performance and Reliability Validation Capabilities at Sandia National Laboratories PV Performance and Reliability Validation Capabilities at Sandia National Laboratories This presenation summarizes the information discussed by Sandia National Laboratories at the PV Manufacturing Workshop, March 25, 2011. PDF icon pv_manufacturing_workshop_2011_march_granata.pdf More Documents & Publications Federal Energy Management Program Report Template

  7. Transmission and Storage Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014 Agenda * DTE Gas Snapshot * NOx & CO - Combustion stability * Methane - ...

  8. 2015 PV Module Reliability Workshop

    Broader source: Energy.gov [DOE]

    The National Renewable Energy Laboratory hosts an annual Photovoltaic (PV) Module Reliability Workshop so that solar technology experts can share information leading to the improvement of PV module reliability. Improvements to module reliability reduce the cost of solar electricity and promotes investor confidence in the technology—both critical goals for moving PV technologies deeper into the electricity marketplace.

  9. Testing for PV Reliability (Presentation)

    SciTech Connect (OSTI)

    Kurtz, S.; Bansal, S.

    2014-09-01

    The DOE SUNSHOT workshop is seeking input from the community about PV reliability and how the DOE might address gaps in understanding. This presentation describes the types of testing that are needed for PV reliability and introduces a discussion to identify gaps in our understanding of PV reliability testing.

  10. Transmission Line Security Monitor

    ScienceCinema (OSTI)

    None

    2013-05-28

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  11. Transmission Line Security Monitor

    SciTech Connect (OSTI)

    2011-01-01

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  12. Thermal Stress and Reliability for Advanced Power Electronics and Electric

    Broader source: Energy.gov (indexed) [DOE]

    Machines | Department of Energy 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C. PDF icon ape_14_okeefe.pdf More Documents & Publications Thermal Stress and Reliability for Advanced Power Electronics and Electric Machines Power Electronic Thermal System Performance and Integration Thermal Performance and Reliability of Bonded Interfaces

  13. Energy Transmission and Infrastructure

    SciTech Connect (OSTI)

    Mathison, Jane

    2012-12-31

    The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

  14. Supervisory Program Analyst (Transformation)

    Broader source: Energy.gov [DOE]

    The Energy Information Administration (EIA) conducts a relevant, reliable, and timely data collection program that covers the full spectrum of energy sources, end uses, and energy flows; generates...

  15. Human Reliability Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Decoding DNA Resources with Additional Information Charles DeLisi As head of DOE's Office of Health and Environmental Research, Charles DeLisi played a pivotal role in proposing and initiating the Human Genome Program in 1986. The U.S. Department of Energy (DOE) has historically been active in supporting human genome research. On September 10, 2003, Secretary of Energy Spencer Abraham presented the Secretary's Gold Award to Aristides Patrinos and Francis Collins for their leadership of the

  16. DOE Announces Webinars on Transmission for Tribal Energy Development,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE's FY17 Strategic Programs Budget Request, and More | Department of Energy Transmission for Tribal Energy Development, EERE's FY17 Strategic Programs Budget Request, and More DOE Announces Webinars on Transmission for Tribal Energy Development, EERE's FY17 Strategic Programs Budget Request, and More March 29, 2016 - 5:22pm Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies, to training for the

  17. Fast estimation of reboiler reliability

    SciTech Connect (OSTI)

    Durand, A.A.; Bonilla, M.A.O.

    1995-08-01

    The problems one faces in evaluating the reliability of a reboiler design, or in judging the effect of modifications of process conditions on reboiler operation can be complex. To carry out such evaluations, it is necessary for engineers to perform some calculations to determine: heat transfer coefficients in convection boiling; temperature difference, for the onset of nucleate boiling; heat transfer coefficients in the nucleate boiling region; critical heat flux or critical temperature difference; minimum {Delta}T for film boiling; and heat transfer coefficients for the film boiling region. There are a number of correlations, graphs, and computer programs that can be used to make these calculations. However, besides being laborious, it is still difficult to get a suitable picture of the overall problem from just this data. To simplify the process, and to have a better understanding of the problem, a map of the different boiling regions and their boundaries is presented here. With this map it is possible to locate the design or operating point of a specific kettle reboiler among all the boiling regions, enabling one to make a clearer analysis of its behavior. The parameters used to develop this map are described.

  18. Integrated Transmission and Distribution Control

    SciTech Connect (OSTI)

    Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

    2013-01-16

    Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

  19. Down hole transmission system

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

    2007-07-24

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

  20. Downhole transmission system

    DOE Patents [OSTI]

    Hall, David R.; Fox, Joe

    2008-01-15

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

  1. Transmission Access Resources

    Broader source: Energy.gov [DOE]

    Historically, the addition of new electric generation facilities has been accompanied by new transmission systems. For example, large nuclear and coal plants built in the 1960s and 1970s required...

  2. Electric Transmission System Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System ... Can we agree on several key design attributes for the future grid? Taking Action in the ...

  3. Transmission Grid Integration

    Broader source: Energy.gov [DOE]

    The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

  4. EIS-0411: Transmission Agency of Northern California Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

  5. National transmission grid study

    SciTech Connect (OSTI)

    Abraham, Spencer

    2003-05-31

    The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE’s Policy Office Electricity Modeling System (POEMS). DOE’s analysis, presented in Section 2, confirms the central role of the nation’s transmission system in lowering costs to consumers through increased trade. More importantly, DOE’s analysis also confirms the results of previous studies, which show that transmission bottlenecks and related transmission system market practices are adding hundreds of millions of dollars to consumers’ electricity bills each year. A more detailed technical overview of the use of POEMS is provided in Appendix A. DOE led an extensive, open, public input process and heard a wide range of comments and recommendations that have all been considered.1 More than 150 participants registered for three public workshops held in Detroit, MI (September 24, 2001); Atlanta, GA (September 26, 2001); and Phoenix, AZ (September 28, 2001).

  6. GRANITE RELIABLE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    It will prevent 130,000 metric tons of carbon dioxide emissions annually. PROJECT STATISTICS: GRANITE RELIABLE PROJECT SUMMARY OWNERS BAIF Granite Holdings & Freshet Wind ...

  7. Transmission Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the

  8. 2012 CERTS LAAR Program Peer Review - Scoping Study on Industrial Regulation - Nasr Alkadi, ORNL

    Energy Savers [EERE]

    Nasr Alkadi, Ph.D. Michael Starke, PhD Oak Ridge National Laboratory CERTS Internal Program Review FY12 DOE-CERTS Transmission Reliability R&D at Lawrence Berkeley National Laboratory. Scoping Study on Industrial Regulation September 20, 2012 2 Managed by UT-Battelle for the U.S. Department of Energy Project objective: Scoping of Regulation Reserves in Industrial Sector 2 Alcoa's Smelting Process is a significant regulation asset at Warrick, IN. * Alcoa has demonstrated Regulation Band in

  9. ITC Transmission | Open Energy Information

    Open Energy Info (EERE)

    ITC Transmission Jump to: navigation, search Name: ITC Transmission Place: Michigan Phone Number: Western Michigan Office: (269) 792-7223 -- Northern Michigan Office: (989)...

  10. Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar (PREDICTS) Funding Opportunity

    Broader source: Energy.gov [DOE]

    The Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar (PREDICTS) program supports projects that evaluate the degradation and failure mechanisms of concentrating...

  11. ORNL Transportation Technology Program - Annual Report Fiscal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... the ORNL carbon fiber pilot line, exceeding program strength ... via density functional theory, synthesis of experimental ... scanning transmission electron microscopy), ...

  12. Utility Static Generation Reliability

    Energy Science and Technology Software Center (OSTI)

    1993-03-05

    PICES (Probabilistic Investigation of Capacity and Energy Shortages) was developed for estimating an electric utility''s expected frequency and duration of capacity deficiencies on a daily on and off-peak basis. In addition to the system loss-of-load probability (LOLP) and loss-of-load expectation (LOLE) indices, PICES calculates the expected frequency and duration of system capacity deficiencies and the probability, expectation, and expected frequency and duration of a range of system reserve margin states. Results are aggregated and printedmore » on a weekly, monthly, or annual basis. The program employs hourly load data and either the two-state (on/off) or a more sophisticated three-state (on/partially on/fully off) generating unit representation. Unit maintenance schedules are determined on a weekly, levelized reserve margin basis. In addition to the 8760-hour annual load record, the user provides the following information for each unit: plant capacity, annual maintenance requirement, two or three-state unit failure and repair rates, and for three-state models, the partial state capacity deficiency. PICES can also supply default failure and repair rate values, based on the Edison Electric Institute''s 1979 Report on Equipment Availability for the Ten-Year Period 1968 Through 1977, for many common plant types. Multi-year analysis can be performed by specifying as input data the annual peak load growth rates and plant addition and retirement schedules for each year in the study.« less

  13. Photovoltaic performance and reliability workshop

    SciTech Connect (OSTI)

    Mrig, L.

    1993-12-01

    This workshop was the sixth in a series of workshops sponsored by NREL/DOE under the general subject of photovoltaic testing and reliability during the period 1986--1993. PV performance and PV reliability are at least as important as PV cost, if not more. In the US, PV manufacturers, DOE laboratories, electric utilities, and others are engaged in the photovoltaic reliability research and testing. This group of researchers and others interested in the field were brought together to exchange the technical knowledge and field experience as related to current information in this evolving field of PV reliability. The papers presented here reflect this effort since the last workshop held in September, 1992. The topics covered include: cell and module characterization, module and system testing, durability and reliability, system field experience, and standards and codes.

  14. Reliability assessment of underground shaft closure

    SciTech Connect (OSTI)

    Fossum, A.F.

    1994-12-31

    The intent of the WIPP, being constructed in the bedded geologic salt deposits of Southeastern New Mexico, is to provide the technological basis for the safe disposal of radioactive Transuranic (TRU) wastes generated by the defense programs of the United States. In determining this technological basis, advanced reliability and structural analysis techniques are used to determine the probability of time-to-closure of a hypothetical underground shaft located in an argillaceous salt formation and filled with compacted crushed salt. Before being filled with crushed salt for sealing, the shaft provides access to an underground facility. Reliable closure of the shaft depends upon the sealing of the shaft through creep closure and recompaction of crushed backfill. Appropriate methods are demonstrated to calculate cumulative distribution functions of the closure based on laboratory determined random variable uncertainty in salt creep properties.

  15. Fatigue and Reliability of Wind Turbines

    Energy Science and Technology Software Center (OSTI)

    1995-08-17

    FAROW is a computer program that assists in the probalistic analysis of the Fatigue and Reliabiity of Wind turbines. The fatigue lifetime of wind turbine components is calculated using functional forms for important input quantities. Parameters of these functions are defined in an input file as either constants or random variables. The user can select from a library of random variable distribution functions. FAROW uses structural reliability techniques to calculate the mean time to failure,more » probability of failure before a target lifetime, relative importance of each of the random inputs, and the sensitivity of the reliability to all input parameters. Monte Carlo simulation is also available.« less

  16. Thermoelectric Mechanical Reliability | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Transport Properties, Thermal Response, and Mechanical Reliability of Thermoelectric Materials and Devices for Automotive Waste Heat Recovery Thermoelectric Mechanical Reliability

  17. Thermoelectric Mechanical Reliability | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    0wereszczak.pdf More Documents & Publications Thermoelectric Mechanical Reliability Thermoelectric Mechanical Reliability Thermoelectrics Theory and Structure

  18. Transmission Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Activity Areas Real Time Grid Reliability Management Reliability and Markets Load as a ... and performing real-time analysis of market behavior and its impact on market performance. ...

  19. Transmission line capital costs

    SciTech Connect (OSTI)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  20. Final Report to the National Energy Technology Laboratory on FY09-FY13 Cooperative Research with the Consortium for Electric Reliability Technology Solutions

    SciTech Connect (OSTI)

    Vittal, Vijay

    2015-11-04

    The Consortium for Electric Reliability Technology Solutions (CERTS) was formed in 1999 in response to a call from U.S. Congress to restart a federal transmission reliability R&D program to address concerns about the reliability of the U.S. electric power grid. CERTS is a partnership between industry, universities, national laboratories, and government agencies. It researches, develops, and disseminates new methods, tools, and technologies to protect and enhance the reliability of the U.S. electric power system and the efficiency of competitive electricity markets. It is funded by the U.S. Department of Energy’s Office of Electricity Delivery and Energy Reliability (OE). This report provides an overview of PSERC and CERTS, of the overall objectives and scope of the research, a summary of the major research accomplishments, highlights of the work done under the various elements of the NETL cooperative agreement, and brief reports written by the PSERC researchers on their accomplishments, including research results, publications, and software tools.

  1. State Research, Outreach, and Technical Assistance to Imrove the Nation's Transmission & Distribution System

    SciTech Connect (OSTI)

    J. Fox; M. Keogh; A. Spahn

    2009-05-20

    The broad purpose of this project was to work cooperatively with the DOE to explore technology nad policy issues associated with more efficient, reliable, and affordable electric transmission and distribution use.

  2. Continuous Reliability Enhancement for Wind (CREW) database : wind plant reliability benchmark.

    SciTech Connect (OSTI)

    Hines, Valerie Ann-Peters; Ogilvie, Alistair B.; Bond, Cody R.

    2013-09-01

    To benchmark the current U.S. wind turbine fleet reliability performance and identify the major contributors to component-level failures and other downtime events, the Department of Energy funded the development of the Continuous Reliability Enhancement for Wind (CREW) database by Sandia National Laboratories. This report is the third annual Wind Plant Reliability Benchmark, to publically report on CREW findings for the wind industry. The CREW database uses both high resolution Supervisory Control and Data Acquisition (SCADA) data from operating plants and Strategic Power Systems' ORAPWind%C2%AE (Operational Reliability Analysis Program for Wind) data, which consist of downtime and reserve event records and daily summaries of various time categories for each turbine. Together, these data are used as inputs into CREW's reliability modeling. The results presented here include: the primary CREW Benchmark statistics (operational availability, utilization, capacity factor, mean time between events, and mean downtime); time accounting from an availability perspective; time accounting in terms of the combination of wind speed and generation levels; power curve analysis; and top system and component contributors to unavailability.

  3. USDA- High Energy Cost Grant Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Agriculture (USDA) offers an ongoing grant program for the improvement of energy generation, transmission, and distribution facilities in rural communities. This program...

  4. NREL: Transmission Grid Integration - Publications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study

  5. EIS-0114: Fall River/Lower Valley Transmission System Reinforcement

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this EIS to explore reinforcing the electrical transmission system in southeastern Idaho by adding a 161-kilovolt partly single- and double-circuit line from the Goshen to Drummond Substations in order to maintain reliable electric service in the area.

  6. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

    1991-08-27

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

  7. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

    1991-01-01

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

  8. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1993-03-23

    A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  9. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

    1993-01-01

    A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  10. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

    1997-01-01

    A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

  11. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1997-03-25

    A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

  12. Energy Storage: The Key to a Reliable, Clean Electricity Supply |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Storage: The Key to a Reliable, Clean Electricity Supply Energy Storage: The Key to a Reliable, Clean Electricity Supply February 22, 2012 - 4:52pm Addthis Improved energy storage technology offers a number of economic and environmental benefits. Improved energy storage technology offers a number of economic and environmental benefits. Matthew Loveless Matthew Loveless Data Integration Specialist, Office of Public Affairs What does this project do? ARPA-E's GRIDS program

  13. EIS-0378: Port Angeles-Juan de Fuca Transmission Project, WA

    Broader source: Energy.gov [DOE]

    This EIS assesses DOE decision to approve the Sea Breeze Transmission project for a Presidential permit for through DOE's Office of Electricity Delivery and Energy Reliability and for approval for interconnection into the federal transmission system through the Bonneville Power Administration (BPA).

  14. EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona

    Broader source: Energy.gov [DOE]

    Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

  15. Drill string transmission line

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David S.; Bradford, Kline; Fox, Joe

    2006-03-28

    A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

  16. Appendix TFIELD: Transmissivity Fields

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Appendix TFIELD-2014 Transmissivity Fields United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Appendix TFIELD-2014 Table of Contents TFIELD-1.0 Overview of the T-field Development, Calibration, and Mining Modification Process TFIELD-2.0 Geologic Data TFIELD-2.1 Culebra Hydrogeologic Setting TFIELD-2.2 Refinement of Geologic Boundaries TFIELD-2.2.1 Rustler Halite Margins TFIELD-2.2.2 Salado

  17. Electro-thermal-mechanical Simulation and Reliability for Plug-in Vehicle

    Broader source: Energy.gov (indexed) [DOE]

    Converters and Inverters | Department of Energy 1 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation PDF icon ape026_hefner_2011_p.pdf More Documents & Publications Electro-thermal-mechanical Simulation and Reliability for Plug-in Vehicle Converters and Inverters Electro-thermal-mechanical Simulation and Reliability for Plug-in Vehicle Converters and Inverters Electro-thermal-mechanical Simulation and Reliability for Plug-in

  18. QER Report: Energy Transmission, Storage, and Distribution Infrastructure | April 2015 EL-1

    Energy Savers [EERE]

    EL-1 Chapter VII Appendix C ELECTRICITY EL-2 QER Report: Energy Transmission, Storage, and Distribution Infrastructure | April 2015 Appendix C: ELECTRICITY Highlights Investments in transmission and distribution upgrades and expansions will grow. It is anticipated that in the next two decades, large transmission and distribution investments will replace aging infrastructure; maintain reliability; enable market efficiencies; and aid in meeting policy objectives, such as greenhouse gas reduction

  19. EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

  20. NREL: Transmission Grid Integration - Transmission Planning and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for

  1. Comments on a National Power Transformer Reserve Program Introduction

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ensuring the reliability, safety, security, and resilience of the electric grid is of ... and improving grid reliability and resilience. 1. Program Need Is there a need for a ...

  2. National Electric Transmission Congestion Study

    Energy Savers [EERE]

    Electric Transmission Congestion Study September 2015 United States Department of Energy Washington, DC 20585 U.S. Department of Energy | September 2015 National Electric Transmission Congestion Study | Page i Message from the Secretary In this study, the U.S. Department of Energy (DOE, the Department) seeks to provide information about transmission congestion by focusing on specific indications of transmission constraints and congestion and their consequences. The study focuses primarily on a

  3. Geothermal Resources and Transmission Planning

    Broader source: Energy.gov [DOE]

    This project addresses transmission-related barriers to utility-scale deployment of geothermal electric generation technologies.

  4. NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance...

    Broader source: Energy.gov (indexed) [DOE]

    partial sequence of events based upon Reliability Coordinator information available to ... PDF icon NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report More ...

  5. Recommendations to Address Power Reliability Concerns Raised...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability Concerns Raised as a Result of Pending Environmental Regulations for Electric Generation Stations Recommendations to Address Power Reliability Concerns Raised as a ...

  6. Distributed Generation Operational Reliability, Executive Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability, Executive Summary Report, January 2004 Distributed Generation Operational Reliability, Executive Summary Report, January 2004 This report summarizes the results of the ...

  7. Continuous Reliability Enhancement for Wind (CREW)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lead aogilvi@sandia.gov Continuous Reliability Enhancement for Wind (CREW) 2012 Wind ... Parts inventory that matches your reliability strategy * Move from reactive to ...

  8. NREL Publishes Gearbox Reliability Collaborative Findings Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publishes Gearbox Reliability Collaborative Findings Report NREL Publishes Gearbox Reliability Collaborative Findings Report October 3, 2011 - 12:56pm Addthis This is an excerpt ...

  9. Information Concerning Reliability Impacts under Various System...

    Office of Environmental Management (EM)

    Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Information Concerning Reliability Impacts under Various System Configurations ...

  10. Continuous Reliability Enhancement for Wind project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... SunShot Grand Challenge: Regional Test Centers Continuous Reliability Enhancement for Wind project HomeTag:Continuous Reliability Enhancement for Wind project The CREW public ...

  11. Distributed Generation Operational Reliability and Availability...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability and Availability Database, Final Report, January 2004 Distributed Generation Operational Reliability and Availability Database, Final Report, January 2004 This final ...

  12. Reliability, O&M, Standards Development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reliability, O&M, Standards Development - Sandia Energy Energy Search Icon Sandia Home ... Twitter Google + Vimeo GovDelivery SlideShare Reliability, O&M, Standards Development ...

  13. Microsoft Word - Pv Reliability Paper.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RELIABILITY AND AVAILABILITY ANALYSIS OF A FIELDED PHOTOVOLTAIC SYSTEM Elmer Collins, ... 87185-1033 ABSTRACT System level reliability and availability estimates are required ...

  14. Smart Grid Investments Improve Grid Reliability, Resilience,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Investments Improve Grid Reliability, Resilience, and Storm Responses (November 2014) Smart Grid Investments Improve Grid Reliability, Resilience, and Storm Responses (November ...

  15. Comments of North American Electric Reliability Corporation ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    North American Electric Reliability Corporation (NERC) to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Comments of North American Electric Reliability ...

  16. North American Electric Reliability Corporation Interconnections...

    Broader source: Energy.gov (indexed) [DOE]

    Map of the North American Electric Reliability Corporation Interconnection showing the Eastern, Western, and Teaxs Interconnectins. North American Electric Reliability Corporation...

  17. Photovoltaic performance and reliability workshop

    SciTech Connect (OSTI)

    Kroposki, B.

    1996-10-01

    This proceedings is the compilation of papers presented at the ninth PV Performance and Reliability Workshop held at the Sheraton Denver West Hotel on September 4--6, 1996. This years workshop included presentations from 25 speakers and had over 100 attendees. All of the presentations that were given are included in this proceedings. Topics of the papers included: defining service lifetime and developing models for PV module lifetime; examining and determining failure and degradation mechanisms in PV modules; combining IEEE/IEC/UL testing procedures; AC module performance and reliability testing; inverter reliability/qualification testing; standardization of utility interconnect requirements for PV systems; need activities to separate variables by testing individual components of PV systems (e.g. cells, modules, batteries, inverters,charge controllers) for individual reliability and then test them in actual system configurations; more results reported from field experience on modules, inverters, batteries, and charge controllers from field deployed PV systems; and system certification and standardized testing for stand-alone and grid-tied systems.

  18. Wind turbine reliability database update.

    SciTech Connect (OSTI)

    Peters, Valerie A.; Hill, Roger Ray; Stinebaugh, Jennifer A.; Veers, Paul S.

    2009-03-01

    This report documents the status of the Sandia National Laboratories' Wind Plant Reliability Database. Included in this report are updates on the form and contents of the Database, which stems from a fivestep process of data partnerships, data definition and transfer, data formatting and normalization, analysis, and reporting. Selected observations are also reported.

  19. UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY

    Energy Savers [EERE]

    UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY National Electric Transmission ) Draft for Public Comment Congestion Study ) 79 Fed Reg. 49076 (2014) ) ) COMMENTS OF WIRES AND THE NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION ON THE DEPARTMENT OF ENERGY REQUEST FOR PUBLIC COMMENT WIRES 1 and the National Electrical Manufacturers Association ("NEMA) 2 respectfully submits these comments in response to the Draft National Electric Transmission

  20. Electricity Transmission, A Primer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system, the economics, and the policies. PDF icon Electricity Transmission, A Primer More Documents & Publications Draft Chapter 4: Transmission Adequacy Chapter 4 Transmission Adequacy Electricity Grid Basics Webinar Presentation Slides and Text Version

  1. Impacts of Demand-Side Resources on Electric Transmission Planning

    SciTech Connect (OSTI)

    Hadley, Stanton W.; Sanstad, Alan H.

    2015-01-01

    Will demand resources such as energy efficiency (EE), demand response (DR), and distributed generation (DG) have an impact on electricity transmission requirements? Five drivers for transmission expansion are discussed: interconnection, reliability, economics, replacement, and policy. With that background, we review the results of a set of transmission studies that were conducted between 2010 and 2013 by electricity regulators, industry representatives, and other stakeholders in the three physical interconnections within the United States. These broad-based studies were funded by the US Department of Energy and included scenarios of reduced load growth due to EE, DR, and DG. While the studies were independent and used different modeling tools and interconnect-specific assumptions, all provided valuable results and insights. However, some caveats exist. Demand resources were evaluated in conjunction with other factors, and limitations on transmission additions between scenarios made understanding the role of demand resources difficult. One study, the western study, included analyses over both 10- and 20-year planning horizons; the 10-year analysis did not show near-term reductions in transmission, but the 20-year indicated fewer transmission additions, yielding a 36percent capital cost reduction. In the eastern study the reductions in demand largely led to reductions in local generation capacity and an increased opportunity for low-cost and renewable generation to export to other regions. The Texas study evaluated generation changes due to demand, and is in the process of examining demand resource impacts on transmission.

  2. Colorado Electrical Transmission Grid

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2012-02-01

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Xcel Energy Publication Date: 2012 Title: Colorado XcelEnergy NonXcel Transmission Network Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains transmission network of Colorado Spatial Domain: Extent: Top: 4540689.017558 m Left: 160606.141934 m Right: 758715.946645 m Bottom: 4098910.893397m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shapefile

  3. Automated manual transmission clutch controller

    DOE Patents [OSTI]

    Lawrie, Robert E.; Reed, Jr., Richard G.; Rausen, David J.

    1999-11-30

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  4. Chapter 4 Transmission Adequacy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is ...

  5. RAPID/Bulk Transmission | Open Energy Information

    Open Energy Info (EERE)

    Page Edit History RAPIDBulk Transmission < RAPID(Redirected from RAPIDOverviewBulkTransmission) Redirect page Jump to: navigation, search REDIRECT RAPIDBulkTransmission...

  6. Bordertown to California Transmission | Open Energy Information

    Open Energy Info (EERE)

    Transmission EIS Bordertown to California 120kV Transmission Line Project Environmental Impact Statement General NEPA Document Info Energy Sector Transmission Environmental...

  7. Electricity Transmission, A Primer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the...

  8. Self-Reliability and Motivation in a Nuclear Security Culture Enhancement

    Office of Scientific and Technical Information (OSTI)

    Program (Conference) | SciTech Connect Conference: Self-Reliability and Motivation in a Nuclear Security Culture Enhancement Program Citation Details In-Document Search Title: Self-Reliability and Motivation in a Nuclear Security Culture Enhancement Program The threat of nuclear terrorism has become a global concern. Many countries continue to make efforts to strengthen nuclear security by enhancing systems of nuclear material protection, control, and accounting (MPC&A). Though MPC&A

  9. NREL: Transportation Research - Power Electronics Packaging Reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Packaging Reliability A photo of a piece of power electronics testing equipment. NREL power electronics packaging reliability research investigates the performance and reliability of emerging interconnection, interface, and packaging materials. Findings help improve reliability and durability of emerging technologies. Photo by Dennis Schroeder, NREL Power electronics packaging around a semiconductor switching device determines the electrical, thermal, and mechanical properties of a power

  10. Dynamic Transmission Electron Microscopy

    SciTech Connect (OSTI)

    Evans, James E.; Jungjohann, K. L.; Browning, Nigel D.

    2012-10-12

    Dynamic transmission electron microscopy (DTEM) combines the benefits of high spatial resolution electron microscopy with the high temporal resolution of ultrafast lasers. The incorporation of these two components into a single instrument provides a perfect platform for in situ observations of material processes. However, previous DTEM applications have focused on observing structural changes occurring in samples exposed to high vacuum. Therefore, in order to expand the pump-probe experimental regime to more natural environmental conditions, in situ gas and liquid chambers must be coupled with Dynamic TEM. This chapter describes the current and future applications of in situ liquid DTEM to permit time-resolved atomic scale observations in an aqueous environment, Although this chapter focuses mostly on in situ liquid imaging, the same research potential exists for in situ gas experiments and the successful integration of these techniques promises new insights for understanding nanoparticle, catalyst and biological protein dynamics with unprecedented spatiotemporal resolution.

  11. collecting reliability and performance data

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    collecting reliability and performance data - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste

  12. disseminating reliability and performance data

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    disseminating reliability and performance data - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste

  13. PV Reliability & Performance Model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reliability & Performance Model - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management

  14. Puget Sound Area Electric Reliability Plan : Final Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-04-01

    A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, and during certain conditions, there is more demand for power in the Puget Sound area than the transmission system and existing generation can reliably supply. This high demand, called peak demand occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both.

  15. Conductive Channel for Energy Transmission

    SciTech Connect (OSTI)

    Apollonov, Victor V. [A.M. Prokhorov General Physics Institute, Vavilov Str. 38, Moscow, 119991 (Russian Federation)

    2011-11-10

    For many years the attempts to create conductive channels of big length were taken in order to study the upper atmosphere and to settle special tasks, related to energy transmission. There upon the program of creation of 'Impulsar' represents a great interest, as this program in a combination with high-voltage high repetition rate electrical source can be useful to solve the above mentioned problems (N. Tesla ideas for the days of high power lasers). The principle of conductive channel production can be shortly described as follows. The 'Impulsar' - laser jet engine vehicle - propulsion take place under the influence of powerful high repetition rate pulse-periodic laser radiation. In the experiments the CO{sub 2}-laser and solid state Nd:YAG laser systems had been used. Active impulse appears thanks to air breakdown (<30 km) or to the breakdown of ablated material on the board (>30 km), placed in the vicinity of the focusing mirror-acceptor of the breakdown waves. With each pulse of powerful laser the device rises up, leaving a bright and dense trace of products with high degree of ionization and metallization by conductive nano-particles due to ablation. Conductive dust plasma properties investigation in our experiments was produced by two very effective approaches: high power laser controlled ablation and by explosion of wire. Experimental and theoretical results of conductive canal modeling will be presented. The estimations show that with already experimentally demonstrated figures of specific thrust impulse the lower layers of the Ionosphere can be reached in several ten seconds that is enough to keep the high level of channel conductivity and stability with the help of high repetition rate high voltage generator. Some possible applications for new technology are highlighted.

  16. DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability Kevin M. Kolevar today announced the Department's designation of two National Interest Electric Transmission Corridors (National Corridors) -- the Mid-Atlantic Area National Interest Electric Transmission Corridor, and the Southwest Area National Interest Electric Transmission Corridor. These corridors include areas in two of the Nation's most populous regions with growing electricity congestion problems. The Department based its designations on data and analysis showing that persistent transmission congestion exists in these two areas.

  17. How to Estimate the Value of Service Reliability Improvements

    SciTech Connect (OSTI)

    Sullivan, Michael J.; Mercurio, Matthew G.; Schellenberg, Josh A.; Eto, Joseph H.

    2010-06-08

    A robust methodology for estimating the value of service reliability improvements is presented. Although econometric models for estimating value of service (interruption costs) have been established and widely accepted, analysts often resort to applying relatively crude interruption cost estimation techniques in assessing the economic impacts of transmission and distribution investments. This paper first shows how the use of these techniques can substantially impact the estimated value of service improvements. A simple yet robust methodology that does not rely heavily on simplifying assumptions is presented. When a smart grid investment is proposed, reliability improvement is one of the most frequently cited benefits. Using the best methodology for estimating the value of this benefit is imperative. By providing directions on how to implement this methodology, this paper sends a practical, usable message to the industry.

  18. May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission

    Energy Savers [EERE]

    Planning Efforts | Department of Energy May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 24, 2013 - 3:41pm Addthis The U.S. Department of Energy Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series

  19. Topic A and B Awardee: Electric Reliability Council of Texas | Department

    Energy Savers [EERE]

    of Energy and B Awardee: Electric Reliability Council of Texas Topic A and B Awardee: Electric Reliability Council of Texas The Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to 22 million Texas customers - representing 85 percent of the state's electric load and 75 percent of the Texas land area. As the independent system operator for the region, ERCOT schedules power on an electric grid that connects 40,000 miles of transmission lines and more than 550

  20. Articles about Grid Integration and Transmission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grid Integration and Transmission Articles about Grid Integration and Transmission RSS Below are stories about grid integration and transmission featured by the U.S. Department of Energy (DOE) Wind Program. March 28, 2016 DOE's 1.5-MW wind turbine at the National Wind Technology Center is being used to demonstrate that wind farms can provide the frequency-responsive back-up or "ancillary services" currently supplied to the electrical grid by conventional power plants. (Photo by Dennis

  1. 2012 National Electric Transmission Congestion Study: Presentation...

    Energy Savers [EERE]

    2012 National Electric Transmission Congestion Study: Presentation from Congestion Study Webinar Series 2012 National Electric Transmission Congestion Study: Presentation from...

  2. Program Development

    SciTech Connect (OSTI)

    Atencio, Julian J.

    2014-05-01

    This presentation covers how to go about developing a human reliability program. In particular, it touches on conceptual thinking, raising awareness in an organization, the actions that go into developing a plan. It emphasizes evaluating all positions, eliminating positions from the pool due to mitigating factors, and keeping the process transparent. It lists components of the process and objectives in process development. It also touches on the role of leadership and the necessity for audit.

  3. Review of Quantitative Software Reliability Methods

    SciTech Connect (OSTI)

    Chu, T.L.; Yue, M.; Martinez-Guridi, M.; Lehner, J.

    2010-09-17

    The current U.S. Nuclear Regulatory Commission (NRC) licensing process for digital systems rests on deterministic engineering criteria. In its 1995 probabilistic risk assessment (PRA) policy statement, the Commission encouraged the use of PRA technology in all regulatory matters to the extent supported by the state-of-the-art in PRA methods and data. Although many activities have been completed in the area of risk-informed regulation, the risk-informed analysis process for digital systems has not yet been satisfactorily developed. Since digital instrumentation and control (I&C) systems are expected to play an increasingly important role in nuclear power plant (NPP) safety, the NRC established a digital system research plan that defines a coherent set of research programs to support its regulatory needs. One of the research programs included in the NRC's digital system research plan addresses risk assessment methods and data for digital systems. Digital I&C systems have some unique characteristics, such as using software, and may have different failure causes and/or modes than analog I&C systems; hence, their incorporation into NPP PRAs entails special challenges. The objective of the NRC's digital system risk research is to identify and develop methods, analytical tools, and regulatory guidance for (1) including models of digital systems into NPP PRAs, and (2) using information on the risks of digital systems to support the NRC's risk-informed licensing and oversight activities. For several years, Brookhaven National Laboratory (BNL) has worked on NRC projects to investigate methods and tools for the probabilistic modeling of digital systems, as documented mainly in NUREG/CR-6962 and NUREG/CR-6997. However, the scope of this research principally focused on hardware failures, with limited reviews of software failure experience and software reliability methods. NRC also sponsored research at the Ohio State University investigating the modeling of digital systems using dynamic PRA methods. These efforts, documented in NUREG/CR-6901, NUREG/CR-6942, and NUREG/CR-6985, included a functional representation of the system's software but did not explicitly address failure modes caused by software defects or by inadequate design requirements. An important identified research need is to establish a commonly accepted basis for incorporating the behavior of software into digital I&C system reliability models for use in PRAs. To address this need, BNL is exploring the inclusion of software failures into the reliability models of digital I&C systems, such that their contribution to the risk of the associated NPP can be assessed.

  4. AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION

    Broader source: Energy.gov [DOE]

    The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

  5. DOE Electricity Transmission System Workshop

    Broader source: Energy.gov (indexed) [DOE]

    ... Activities can span from basic R&D through demonstration projects. Parallel Breakout Sessions (see white paper: "DOE Action Plan Addressing the Electricity Transmission System") ...

  6. Transmission Expansion in the Midwest

    Broader source: Energy.gov [DOE]

    At this unique forum, participants will hear top executives from the area's RTOs, utilities, transmission developers, and state regulatory agencies discuss and debate the most critical issues...

  7. Small passenger car transmission test: Chevrolet Luv transmission

    SciTech Connect (OSTI)

    Bujold, M.P.

    1980-06-01

    The small passenger car transmission test was initiated to supply electric vehicle manufacturers with technical information regarding the performance of commercially available transmissions. This information would enable EV manufacturers to design a more energy efficient vehicle. With this information the manufacturers would be able to estimate vehicle driving range as well as speed and torque requirements for specific roadload performance characteristics. This report covers the 1978 Chevrolet Luv Truck manual transmission. This transmission was tested per a passenger car automatic transmission test code (SAE J65lb) which required drive performance, coast performance, and no load test conditions. The portion of the test code which involved the throttle valve modulation and line pressure were deleted since they did not apply to the manual transmission. Under these test conditions the transmission attained maximum efficiencies in the upper 90% range at rated load for both drive performance tests and coast performance tests. The major results of this test are the torque speed and efficiency curves which are located in the data section of this report. These graphs map the complete performance characteristics for the Chevrolet Luv Truck Manual transmission. This information will facilitate the vehicle manufacturer in the design of a more energy efficient vehicle.

  8. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    SciTech Connect (OSTI)

    Hendrickson, D.W. [ed.

    1995-03-14

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

  9. EC Transmission Line Materials

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-05-01

    The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

  10. HVDC power transmission technology assessment

    SciTech Connect (OSTI)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D.; Johnson, B.K.; Stewart, J.R.; Fink, J.L.

    1997-04-01

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  11. DOE Human Reliability Program Removals Report 2004-2006 (Technical...

    Office of Scientific and Technical Information (OSTI)

    This report presents results of the comprehensive data analysis and assessment of all U.S. ... The HRP was established to ensure, through continuous review and evaluation, the ...

  12. DOE Human Reliability Program Removals Report 2004-2006 (Technical...

    Office of Scientific and Technical Information (OSTI)

    DOE Contract Number: DE-AC05-06OR23100 Resource Type: Technical Report Research Org: Oak Ridge Institute for Science and Education (ORISE), Oak Ridge, TN Sponsoring Org: Office of ...

  13. Deputy Director, Office of Electric Reliability | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability Deputy Director, Office of Electric Reliability Submitted by admin on Sat, 2016-01-16 00:16 Job Summary Organization Name Department Of Energy Agency SubElement...

  14. Reliability Challenges for Solar Energy (Presentation)

    SciTech Connect (OSTI)

    Kurtz, S.

    2009-12-08

    Presentation that reviews reliability issues related to various types of photovoltaic tecnnologies, including crystalline silicon, thin films, and concentrating PV.

  15. Strategies for assuring operational reliability of process units: A team effort

    SciTech Connect (OSTI)

    Merlano, N.; Ramirez, J.E.; Merchan, R.

    1996-12-01

    Operational reliability and low operational costs are becoming an important issue in Latin-American Industries. Programs promoting structural integrity and life assessment are becoming part of the strategies of industry to cope with increasingly competitive markets. However, structural integrity and life assessment is not all that is required to attain the goal of operational reliability; it is necessary to integrate in the assessment strategy the relationship between process variables, operational variables, maintenance, inspection, materials science and even instrument reliability. It is also important to take into account environmental regulations and personnel safety. A recent experimental program, aimed at developing and implementing a strategy which combines all the above mentioned aspects, has been undertaken. This article briefly describes an internal ``Guide for Operational Reliability`` developed as part of the program and discusses the Fitness-For-Service assessment of a cracked tower carried out during the first phase of the program.

  16. Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar

    Broader source: Energy.gov [DOE]

    The SunShot Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar (PREDICTS) program is taking a physics- and chemistry-based approach to identifying failure modes...

  17. Distributed Generation Operational Reliability, Executive Summary Report,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 2004 | Department of Energy Reliability, Executive Summary Report, January 2004 Distributed Generation Operational Reliability, Executive Summary Report, January 2004 This report summarizes the results of the project, "Distributed Generation Market Transformation Tools: Distributed Generation Reliability and Availability Database," sponsored by Oak Ridge National Laboratory (ORNL), Energy Solutions Center (ESC), New York State Energy Research and Development Authority

  18. Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions

    Broader source: Energy.gov [DOE]

    Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed that gap in recent...

  19. NREL: Transmission Grid Integration - Glossary of Transmission Grid

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Integration Terms Glossary of Transmission Grid Integration Terms The following glossary defines common transmission grid integration terms and concepts. Ancillary services Services that help grid operators maintain balance on electric power systems. These include regulation and the contingency reserves: spinning, non-spinning, and, in some regions, supplemental operating. Balancing authority area A metered segment of the electric power system in which electrical balance is maintained. In a

  20. Electro-thermal-mechanical Simulation and Reliability for Plug-in Vehicle

    Broader source: Energy.gov (indexed) [DOE]

    Converters and Inverters | Department of Energy 2 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting PDF icon ape026_hefner_2012_o.pdf More Documents & Publications Electro-thermal-mechanical Simulation and Reliability for Plug-in Vehicle Converters and Inverters Electro-thermal-mechanical Simulation and Reliability for Plug-in Vehicle Converters and Inverters Vehicle Technologies Office Merit Review 2014:

  1. Electrical transmission line diametrical retainer

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David; Dahlgren, Scott; Sneddon, Cameron; Briscoe, Michael; Fox, Joe

    2004-12-14

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

  2. Great Plains Wind Energy Transmission Development Project

    SciTech Connect (OSTI)

    Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

    2012-06-09

    In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

  3. Initial results of the CD-1 reliable multicast experiment

    SciTech Connect (OSTI)

    Agarwal, D.; Stead, R.; Coan, B.; Burns, J. E.; Shah, N.; Kyriakopoulos, N.

    2000-09-29

    During the past year, an experiment has been underway to test use of reliable multicast capabilities for transmission of continuous data in the Global Communication Infrastructure. For the experiment a version of the CD-1 protocol was multicast enabled. The experiment has demonstrated the feasibility of transmitting data in a multicast mode over the GCI. In the case of the Comprehensive Nuclear Test-Ban Treaty the sender could be the station and the receivers the International Data Center (IDC) and one or more National Data Centers (NDC). The potential advantages of multicasting include (a) the timely receipt of the data by the IDC and the host NDC and (b) the simultaneous availability of the raw station data at, at least, two locations. The latter, by introducing redundant data paths, decreases the probability of loss of station data due to a potential failure of a single data receiver. This experiment is only one element of a needed more thorough assessment of the reliability and cost-effectiveness of introducing redundancies in the data transmission paths and the data sinks of the IMS. The next stage of the multicast experiment planned is installation of the multicast-enabled CD-1 software at the GERES IMS station, at the German NDC and at the IDC for further experiments with actual IMS station data. This stage of the experiment is waiting on installation of a GCI link to the German NDC. Negotiations regarding price for this installation have been on going between the Global Communication Infrastructure (GCI) contractor and the German NDC with no resolution. Current development of the CD-x protocol is proceeding in two complementary directions. Along with the work on a multicast enabled version of CD-1 there is also work to develop CD-1.1, which will add end-to-end reliability to the CD-1 protocol among other things. A possible future activity would be to combine the reliable multicast and the end-to-end reliability mechanisms into one CD-x protocol version.

  4. Pompano subsea development -- Testing program

    SciTech Connect (OSTI)

    Nelson, R.; Berger, R.; Tyer, C.

    1996-12-31

    System reliability is essential for the economic success of any subsea oil and gas development. Testing programs can be developed to prove system reliability while still adhering to cost and schedule constraints. This paper describes a three-tiered equipment testing program that was employed for the Pompano Phase 2 subsea system. Program objectives, test descriptions, procedure development and test execution are discussed in detail. Lessons learned throughout the tests are also presented.

  5. EIS-0231: Navajo Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned...

  6. Transmission Services Product Pricing Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and 09:00 PPT on the above effective date. On October 15, 2013, at 08:00 (PPT), Transmission Services will be updating the OASIS default product prices to reflect the 2014...

  7. Transmission Services Product Pricing Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and 12:00 PPT on the above effective date. On October 1, 2015, at 11:00 (PPT), Transmission Services will be updating the OASIS default product prices to reflect the 2016...

  8. National Electric Transmission Congestion Studies

    Office of Energy Efficiency and Renewable Energy (EERE)

    Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to include in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmission capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor).

  9. Transmission Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity ...

  10. DOE Seeks Independent Evaluation of Remote-Handled Waste Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Seeking Information on Transmission Line Permitting DOE Seeking Information on Transmission Line Permitting February 27, 2012 - 3:25pm Addthis The Department of Energy's Office of Electricity Delivery and Energy Reliability is seeking information on the questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local, and Tribal authorizations and are

  11. NREL: Transmission Grid Integration - Webinars

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Past Webinars The Rise of Renewables: Integration Challenges and Opportunities Thursday, May 29, 2014 As states reach higher levels of renewable energy, challenges can arise because of larger amounts of wind and solar energy on

  12. MEMS reliability in shock environments

    SciTech Connect (OSTI)

    TANNER,DANELLE M.; WALRAVEN,JEREMY A.; HELGESEN,KAREN SUE; IRWIN,LLOYD W.; BROWN,FREDERICK A.; SMITH,NORMAN F.; MASTERS,NATHAN

    2000-02-09

    In order to determine the susceptibility of the MEMS (MicroElectroMechanical Systems) devices to shock, tests were performed using haversine shock pulses with widths of 1 to 0.2 ms in the range from 500g to 40,000g. The authors chose a surface-micromachined microengine because it has all the components needed for evaluation: springs that flex, gears that are anchored, and clamps and spring stops to maintain alignment. The microengines, which were unpowered for the tests, performed quite well at most shock levels with a majority functioning after the impact. Debris from the die edges moved at levels greater than 4,000g causing shorts in the actuators and posing reliability concerns. The coupling agent used to prevent stiction in the MEMS release weakened the die-attach bond, which produced failures at 10,000g and above. At 20,000g the authors began to observe structural damage in some of the thin flexures and 2.5-micron diameter pin joints. The authors observed electrical failures caused by the movement of debris. Additionally, they observed a new failure mode where stationary comb fingers contact the ground plane resulting in electrical shorts. These new failure were observed in the control group indicating that they were not shock related.

  13. Time-Dependent Reliability Analysis

    Energy Science and Technology Software Center (OSTI)

    1999-10-27

    FRANTIC-3 was developed to evaluate system unreliability using time-dependent techniques. The code provides two major options: to evaluate standby system unavailability or, in addition to the unavailability to calculate the total system failure probability by including both the unavailability of the system on demand as well as the probability that it will operate for an arbitrary time period following the demand. The FRANTIC-3 time dependent reliability models provide a large selection of repair and testingmore » policies applicable to standby or continously operating systems consisting of periodically tested, monitored, and non-repairable (non-testable) components. Time-dependent and test frequency dependent failures, as well as demand stress related failure, test-caused degradation and wear-out, test associated human errors, test deficiencies, test override, unscheduled and scheduled maintenance, component renewal and replacement policies, and test strategies can be prescribed. The conditional system unavailabilities associated with the downtimes of the user specified failed component are also evaluated. Optionally, the code can perform a sensitivity study for system unavailability or total failure probability to the failure characteristics of the standby components.« less

  14. Transmission SEAB Presentation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission SEAB Presentation Transmission SEAB Presentation PDF icon Transmission SEAB Presentation More Documents & Publications Before House Natural Resources Committee QER - Comment of American Public Power Association 5 Before the House Committee on Natural Resources

  15. High reliability plastic packaging for microelectronics

    SciTech Connect (OSTI)

    Sweet, J.N.; Peterson, D.W.; Hsia, A.H.; Tuck, M.

    1997-07-01

    Goal was Assembly Test Chips (ATCs) which could be used for evaluating plastic encapsulation technologies. Circuits were demonstrated for measuring Au-Al wirebond and Al metal corrosion failure rates during accelerated temperature and humidity testing. The test circuits on the ATC02.5 chip were very sensitive to extrinsic or processing induced failure rates. Accelerated aging experiments were conducted with unpassivated triple track Al structures on the ATC02.6 chip; the unpassivated tracks were found to be very sensitive to particulate contamination. Some modifications to existing circuitry were suggested. The piezoresistive stress sensing circuitry designed for the ATC04 test chip was found suitable for determining the change in the state of mechanical stress at the die when both initial and final measurements were made near room temperature (RT). Attempt to measure thermal stress between RT and a typical polymer glass transition temperature failed because of excessive die resistor- substrate leakage currents at the high temperature end; suitable circuitry changes were developed to overcome this problem. One temperature and humidity experiment was conducted with Sandia developed static radom access memory parts to examine non-corrosion CMOS failures; this objective was not achieved, but corrosion failure at the metal to Si contacts on the die surface could be detected. This 2-year effort resulted in new designs for test circuits which could be used on an advanced ATC for reliability assessment in Defense Programs electronics development projects.

  16. Electric Transmission Siting | Open Energy Information

    Open Energy Info (EERE)

    OtherOther: Electric Transmission SitingLegal Abstract Brief overview of the California Public Utilities Commission's process for siting of electric transmission lines. Published...

  17. Hydrogen Transmission and Distribution Workshop | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Transmission and Distribution Workshop The U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) held a Hydrogen Transmission and Distribution ...

  18. Energy Efficiency, Renewable Energy and Advanced Transmission...

    Energy Savers [EERE]

    Renewable Energy and Advanced Transmission and Distribution Technologies Issued: July 29, 2009 Energy Efficiency, Renewable Energy and Advanced Transmission and Distribution ...

  19. Transmission Losses Product (pbl/products)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wind Smoothing and Intertie Service (Pilot) Firstgov Pricing for Transmission Losses Product Bonneville Power Administration (BPA) Power Services offers to sell transmission...

  20. Midwest Independent Transmission System Operator | Open Energy...

    Open Energy Info (EERE)

    Midwest Independent Transmission System Operator Jump to: navigation, search Name: Midwest Independent Transmission System Operator Place: Carmel, IN References: SGIC1 This...

  1. American Transmission Systems Inc | Open Energy Information

    Open Energy Info (EERE)

    American Transmission Systems Inc Jump to: navigation, search Name: American Transmission Systems Inc Place: Ohio Website: www.atcllc.com Twitter: @amertransco References: EIA...

  2. Interconnection-Wide Transmission Planning Initiative: Topic...

    Energy Savers [EERE]

    the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas ...

  3. DOE Transmission Capacity Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission systems both complement and substitute for generation. Transmission generally ... load growth, generator construction, and other factors affecting the electric system. ...

  4. Lone Star Transmission LLC | Open Energy Information

    Open Energy Info (EERE)

    Transmission LLC Jump to: navigation, search Name: Lone Star Transmission LLC Place: Juno Beach, Florida Zip: 33408 Product: Wholly owned subsidiary of FPL Energy, developing...

  5. Transmission Capital Limited | Open Energy Information

    Open Energy Info (EERE)

    Transmission Capital Limited Jump to: navigation, search Name: Transmission Capital Limited Place: London, United Kingdom Zip: EC2V 7HR Sector: Renewable Energy, Services Product:...

  6. Southwest Transmission Cooperative, Inc. Smart Grid Project ...

    Open Energy Info (EERE)

    syntax: * Display map References ARRA Smart Grid Investment Grants1 Southwest Transmission Cooperative Award2 Southwest Transmission Cooperative, Inc., located in Benson,...

  7. 2006 National Electric Transmission Congestion Study | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor). ...

  8. 2009 National Electric Transmission Congestion Study | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor). ...

  9. 2006 National Electric Transmission Congestion Study Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

  10. Interconnection-Wide Transmission Planning Initiative - Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to ...

  11. Fundamental mechanisms of micromachine reliability

    SciTech Connect (OSTI)

    DE BOER,MAARTEN P.; SNIEGOWSKI,JEFFRY J.; KNAPP,JAMES A.; REDMOND,JAMES M.; MICHALSKE,TERRY A.; MAYER,THOMAS K.

    2000-01-01

    Due to extreme surface to volume ratios, adhesion and friction are critical properties for reliability of Microelectromechanical Systems (MEMS), but are not well understood. In this LDRD the authors established test structures, metrology and numerical modeling to conduct studies on adhesion and friction in MEMS. They then concentrated on measuring the effect of environment on MEMS adhesion. Polycrystalline silicon (polysilicon) is the primary material of interest in MEMS because of its integrated circuit process compatibility, low stress, high strength and conformal deposition nature. A plethora of useful micromachined device concepts have been demonstrated using Sandia National Laboratories' sophisticated in-house capabilities. One drawback to polysilicon is that in air the surface oxidizes, is high energy and is hydrophilic (i.e., it wets easily). This can lead to catastrophic failure because surface forces can cause MEMS parts that are brought into contact to adhere rather than perform their intended function. A fundamental concern is how environmental constituents such as water will affect adhesion energies in MEMS. The authors first demonstrated an accurate method to measure adhesion as reported in Chapter 1. In Chapter 2 through 5, they then studied the effect of water on adhesion depending on the surface condition (hydrophilic or hydrophobic). As described in Chapter 2, they find that adhesion energy of hydrophilic MEMS surfaces is high and increases exponentially with relative humidity (RH). Surface roughness is the controlling mechanism for this relationship. Adhesion can be reduced by several orders of magnitude by silane coupling agents applied via solution processing. They decrease the surface energy and render the surface hydrophobic (i.e. does not wet easily). However, only a molecular monolayer coats the surface. In Chapters 3-5 the authors map out the extent to which the monolayer reduces adhesion versus RH. They find that adhesion is independent of RH up to a threshold value, depending on the coating chemistry. The mechanism for the adhesion increase beyond this threshold value is that the coupling agent reconfigures from a surface to a bulk phase (Chapter 3). To investigate the details of how the adhesion increase occurs, the authors developed the mechanics for adhesion hysteresis measurements. These revealed that near-crack tip compression is the underlying cause of the adhesion increase (Chapter 4). A vacuum deposition chamber for silane coupling agent deposition was constructed. Results indicate that vapor deposited coatings are less susceptible to degradation at high RH (Chapter 5). To address issues relating to surfaces in relative motion, a new test structure to measure friction was developed. In contrast to other surface micromachined friction test structures, uniform apparent pressure is applied in the frictional contact zone (Chapter 6). The test structure will enable friction studies over a large pressure and dynamic range. In this LDRD project, the authors established an infrastructure for MEMS adhesion and friction metrology. They then characterized in detail the performance of hydrophilic and hydrophobic films under humid conditions, and determined mechanisms which limit this performance. These studies contribute to a fundamental understanding for MEMS reliability design rules. They also provide valuable data for MEMS packaging requirements.

  12. Cobalt stabilization of silver extraordinary optical transmission sensing platforms

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Farah, Annette E.; Davidson, Roderick B.; Pooser, Raphael C.; Lawrie, Benjamin J.; Kalyanaraman, Ramki; Malasi, A.

    2016-01-25

    In this study, plasmon-mediated extraordinary optical transmission (EOT) is finding increased interest for biosensing applications. While Ag nanostructures are capable of the highest plasmonic quality factor of all metals, the performance reliability of pure Ag EOT devices is limited by degradation through environmental interactions. Here we show that EOT devices consisting of nanostructured hole arrays in Ag/Co bilayers show comparable transmission with that of identical hole arrays in Agthin films as well as enhanced reliability measured by the rate of resonance peak redshift and broadening with time. The Ag/Co EOT devices showed 2.6× and 1.9× smaller red shift in shortmore » timescales (20 days) and after 100 days, respectively, while they showed a 1.7× steady-state decrease in rate of bandwidth broadening. This improvement is likely due to the Co metal stabilizing the Agfilm from morphological changes by reducing its propensity to diffuse or dewet on the underlying substrate. The improved reliability of Ag/Co bilayer EOT devices could enable the use of their superior plasmonic properties for optical detection of trace chemicals.« less

  13. Reliability-based condition assessment of steel containment and liners

    SciTech Connect (OSTI)

    Ellingwood, B.; Bhattacharya, B.; Zheng, R.

    1996-11-01

    Steel containments and liners in nuclear power plants may be exposed to aggressive environments that may cause their strength and stiffness to decrease during the plant service life. Among the factors recognized as having the potential to cause structural deterioration are uniform, pitting or crevice corrosion; fatigue, including crack initiation and propagation to fracture; elevated temperature; and irradiation. The evaluation of steel containments and liners for continued service must provide assurance that they are able to withstand future extreme loads during the service period with a level of reliability that is sufficient for public safety. Rational methodologies to provide such assurances can be developed using modern structural reliability analysis principles that take uncertainties in loading, strength, and degradation resulting from environmental factors into account. The research described in this report is in support of the Steel Containments and Liners Program being conducted for the US Nuclear Regulatory Commission by the Oak Ridge National Laboratory. The research demonstrates the feasibility of using reliability analysis as a tool for performing condition assessments and service life predictions of steel containments and liners. Mathematical models that describe time-dependent changes in steel due to aggressive environmental factors are identified, and statistical data supporting the use of these models in time-dependent reliability analysis are summarized. The analysis of steel containment fragility is described, and simple illustrations of the impact on reliability of structural degradation are provided. The role of nondestructive evaluation in time-dependent reliability analysis, both in terms of defect detection and sizing, is examined. A Markov model provides a tool for accounting for time-dependent changes in damage condition of a structural component or system. 151 refs.

  14. Information Concerning Reliability Impacts under Various System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Configurations of the Mirant Potomac River Plant | Department of Energy Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Information Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Docket No. EO-05-01: PJM Interconnection, L.L.C. and PEPCO Holdings, Inc. is hereby providing you with additional information concerning reliability impacts under various system conditions associated with the

  15. Distributed Generation Operational Reliability and Availability Database,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Report, January 2004 | Department of Energy Reliability and Availability Database, Final Report, January 2004 Distributed Generation Operational Reliability and Availability Database, Final Report, January 2004 This final report documents the results of an 18-month project entitled, "Distributed Generation Market Transformation Tools: Distributed Generation Reliability and Availability Database," sponsored by Oak Ridge National Laboratory (ORNL), Energy Solutions Center

  16. Savannah River Ecology Laboratory - Outreach Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program

  17. Savannah River Ecology Laboratory - Outreach Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program

  18. Reliable Power Inc | Open Energy Information

    Open Energy Info (EERE)

    Reliable Power Inc Place: Arlington, Virginia Zip: VA 22201 Product: US-based fuel cell manufacturer. Coordinates: 43.337585, -89.379449 Show Map Loading map......

  19. Salvage Values Determines Reliability of Used Photovoltaics ...

    Broader source: Energy.gov (indexed) [DOE]

    Presented at the PV Module Reliability Workshop, February 26 - 27 2013, Golden, Colorado PDF icon pvmrw13ps1energyideasmccabe.pdf More Documents & Publications Revitalizing ...

  20. Continuous Reliability Enhancement for Wind (CREW)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technologies Alistair Ogilvie, CREW Project Lead aogilvi@sandia.gov Continuous Reliability Enhancement for Wind (CREW) 2012 Wind Turbine Blade Workshop June 1, 2012 SAND...

  1. Augmenting system reliability analyses with observation priors...

    Office of Scientific and Technical Information (OSTI)

    missing data may be imputed using standard data augmentation (DA). This process is already used in the current implementation of the JMP complex-system reliability modeling codes. ...

  2. China and India PV Reliability-NREL Cooperation | Open Energy...

    Open Energy Info (EERE)

    PV Reliability-NREL Cooperation Jump to: navigation, search Logo: China and India PV Reliability under the Asia Pacific Partnership Name China and India PV Reliability under the...

  3. Topic A and B Awardee: Electric Reliability Council of Texas...

    Office of Environmental Management (EM)

    and B Awardee: Electric Reliability Council of Texas Topic A and B Awardee: Electric Reliability Council of Texas The Electric Reliability Council of Texas (ERCOT) manages the flow ...

  4. Thermal Performance and Reliability of Bonded Interfaces | Department...

    Broader source: Energy.gov (indexed) [DOE]

    ...28narumanchi2011o.pdf More Documents & Publications Thermal Performance and Reliability of Bonded Interfaces Thermal Performance and Reliability of Bonded Interfaces Reliability

  5. Electricity Reliability Council of Texas | Open Energy Information

    Open Energy Info (EERE)

    Reliability Council of Texas Jump to: navigation, search Logo: Electricity Reliability Council of Texas Name: Electricity Reliability Council of Texas Abbreviation: ERCOT Address:...

  6. Load As A Reliability Resource in the Restructured Electricity Market

    SciTech Connect (OSTI)

    Kueck, J.D.

    2002-06-10

    Recent electricity price spikes are painful reminders of the value that meaningful demand-side responses could bring to the restructuring US electricity system. Review of the aggregate offers made by suppliers confirms that even a modest increase in demand elasticity could dramatically reduce these extremes in price volatility. There is a strong need for dramatically increased customer participation in these markets to enhance system reliability and reduce price volatility. Indeed, allowing customers to manage their loads in response to system conditions might be thought of as the ultimate reliability resource. Most would agree that meaningful demand-side responses to price are the hallmark of a well-functioning competitive market [1]. Yet, in today's markets for electricity, little or no such response is evident. The reason is simple: customers currently do not experience directly the time-varying costs of their consumption decisions. Consequently, they have no incentive to modify these decisions in ways that might enhance system reliability or improve the efficiency of the markets in which electricity is traded. Increased customer participation is a necessary step in the evolution toward more efficient markets for electricity and ancillary services. This scoping report provides a three-part assessment of the current status of efforts to enhance the ability of customer's load to participate in competitive markets with a specific focus on the role of customer loads in enhancing electricity system reliability. First, this report considers the definitions of electricity-reliability-enhancing ancillary services (Section 2) and a preliminary assessment of the ability of customer's loads to provide these services. Second, is a review a variety of programs in which load has been called on as a system reliability resource (Section 3). These experiences, drawn from both past and current utility and ISO programs, focus on programs triggered by system condition (e.g., forecast reserves fall below a threshold), rather than those triggered by price (e.g., real-time prices). Third, the report examines the status of the underlying metering, communication, and control technologies required to enable customer loads to participate in competitive electricity markets (Section 4). Following the three-part assessment, we offer preliminary thoughts on directions for future research (Section 5).

  7. PVMRW 2016 Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PVMRW 2016 Program Tuesday 23 February 2016 (venue: Sheraton West, Lakewood, CO) PV Module Reliability Continental Breakfast (7:30 - 8:00 am) The Connection Between Cost and PV Reliability (8:00 - 9:40 am) 8:00 - Welcome to PVMRW 2016 - David Miller (NREL) 8:05 - NREL's Welcome - Greg Wilson (NREL) 8:10 - Introduction - Geoffrey Bratton (JP Morgan) and Dixon Wright (Wells Fargo) 8:15 - SunShot Initiative: Lower Cost via Proven PV Module Reliability - Geoff Kinsey (DOE) 8:35 - Connecting

  8. Thermal Performance and Reliability of Bonded Interfaces

    Broader source: Energy.gov [DOE]

    2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  9. Note: Reliable low-vibration piezo-mechanical shutter

    SciTech Connect (OSTI)

    Bauer, Michael Franzreb, Philipp Pierre; Widera, Artur; Spethmann, Nicolas

    2014-09-15

    We present a mechanical shutter based on a bending piezo-actuator. The shutter features an active aperture of about 2 mm, allowing for full extinction and lossless transmission of a beam. Acoustic noise and mechanical vibrations produced are very low and the shutter is outstandingly long-lived; a test device has undergone 20 × 10{sup 6} cycles without breaking. A reflector makes the shutter capable of reliably interrupting a beam with at least 2 W of cw power at 780 nm. The shutter is well suited to create pulses as short as 16 ms, while pulse lengths down to 1 ms are possible. The rise and fall times are approximately 120 µs, with a delay of 2 ms. Jitter stays below 10 µs, while long-term drifts stay well below 500 µs.

  10. Wind Integration, Transmission, and Resource Assessment and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Characterization Projects | Department of Energy Integration, Transmission, and Resource Assessment and Characterization Projects Wind Integration, Transmission, and Resource Assessment and Characterization Projects This report covers the Wind and Water Power Technologies Office's Wind integration, transmission, and resource assessment and characterization projects from fiscal years 2006 to 2014. PDF icon Wind Integration, Transmission, and Resource Assessment and Characterization Projects

  11. Interconnection Transmission Planning: Awards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and Reinvestment Act organized by interconnection including the organization and amount of Recovery Act funding PDF icon Interconnection Transmission Planning: Awards More Documents & Publications EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 Report: Impacts of Demand-Side

  12. EIS-0103: New England/Hydro-Quebec 450-kV Direct Current Transmission Line Interconnection

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration prepared this statement to evaluate the environmental impacts of the construction, maintenance, and operation of a 57-mile transmission line from Monroe, New Hampshire, to the U.S./Canadian border for the purpose of economic exchange of power and increased reliability. Phase 2 of this project is detailed in EIS-0129.

  13. The pathogen transmission avoidance theory of sexual selection

    SciTech Connect (OSTI)

    Loehle, C.

    1997-08-01

    The current theory that sexual selection results from female preference for males with good genes suffers from several problems. An alternative explanation, the pathogen transmission avoidance hypothesis, argues that the primary function of showy traits is to provide a reliable signal of current disease status, so that sick individuals can be avoided during mating. This study shows that a significant risk of pathogen transmission occurs during mating and that showy traits are reliable indicators of current disease status. The origin of female choosiness is argued to lie in a general tendency to avoid sick individuals, even in the absence of showy traits, which originate as exaggerations of normal traits that are indicative of good health (bright feathers, vigorous movement, large size). Thus, in this new model the origins of both showy traits and female choosiness are not problematic and there is no threshold effect. This model predicts that when the possession of male showy traits does not help to reduce disease in the female, showy traits are unlikely to occur. This case corresponds to thorough exposure of every animal to all group pathogens, on average, in large groups. Such species are shown with a large data set on birds to be less likely to exhibit showy traits. The good-genes model does not make this prediction. The pathogen transmission avoidance model can also lead to the evolution of showy traits even when selection is not effective against a given pathogen (e.g., when there is no heritable variation for resistance), but can result in selection for resistance if such genes are present. Monogamy is argued to reduce selection pressures for showy traits; data show monogamous species to be both less parasitized and less showy. In the context of reduction of pathogen transmission rates in showy populations, selection pressure becomes inversely frequency-dependent, which makes showy traits likely to be self-limiting rather than runaway.

  14. Power superconducting power transmission cable

    DOE Patents [OSTI]

    Ashworth, Stephen P.

    2003-01-01

    The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

  15. Power superconducting power transmission cable

    DOE Patents [OSTI]

    Ashworth, Stephen P.

    2003-06-10

    The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

  16. Observations and Modeling of the Green Ocean Amazon 2014/15: Transmission

    Office of Scientific and Technical Information (OSTI)

    Electron Microscopy Analysis of Aerosol Particles Field Campaign Report (Program Document) | SciTech Connect SciTech Connect Search Results Program Document: Observations and Modeling of the Green Ocean Amazon 2014/15: Transmission Electron Microscopy Analysis of Aerosol Particles Field Campaign Report Citation Details In-Document Search Title: Observations and Modeling of the Green Ocean Amazon 2014/15: Transmission Electron Microscopy Analysis of Aerosol Particles Field Campaign Report

  17. Reliability Estimates for Power Supplies

    SciTech Connect (OSTI)

    Lee C. Cadwallader; Peter I. Petersen

    2005-09-01

    Failure rates for large power supplies at a fusion facility are critical knowledge needed to estimate availability of the facility or to set priorties for repairs and spare components. A study of the "failure to operate on demand" and "failure to continue to operate" failure rates has been performed for the large power supplies at DIII-D, which provide power to the magnet coils, the neutral beam injectors, the electron cyclotron heating systems, and the fast wave systems. When one of the power supplies fails to operate, the research program has to be either temporarily changed or halted. If one of the power supplies for the toroidal or ohmic heating coils fails, the operations have to be suspended or the research is continued at de-rated parameters until a repair is completed. If one of the power supplies used in the auxiliary plasma heating systems fails the research is often temporarily changed until a repair is completed. The power supplies are operated remotely and repairs are only performed when the power supplies are off line, so that failure of a power supply does not cause any risk to personnel. The DIII-D Trouble Report database was used to determine the number of power supply faults (over 1,700 reports), and tokamak annual operations data supplied the number of shots, operating times, and power supply usage for the DIII-D operating campaigns between mid-1987 and 2004. Where possible, these power supply failure rates from DIII-D will be compared to similar work that has been performed for the Joint European Torus equipment. These independent data sets support validation of the fusion-specific failure rate values.

  18. Competition and Reliability in North American Electricity Markets...

    Energy Savers [EERE]

    Electricity Markets Technical Workshop Competition and Reliability in North American Electricity Markets Technical Workshop Competition and Reliability in North American ...

  19. Transmission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volunteers - Sign Up About Science Bowl Curriculum and Activities How to Build a Motor The Great Marble Drop How to Build a Turbine How to Build a Tower Classroom...

  20. U.S. Department of Energy Office of Electricity Delivery & Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability: Transmission Reliability Program | Department of Energy Department of Energy Office of Electricity Delivery & Energy Reliability: Transmission Reliability Program U.S. Department of Energy Office of Electricity Delivery & Energy Reliability: Transmission Reliability Program The Transmission Reliability Program was established by Congress in 1999 to support a national laboratory/electricity industry partnership to conduct research on the reliability of the nation's

  1. U.S. Department of Energy's Request for Hearing and Answer to

    Office of Environmental Management (EM)

    Reliability: Transmission Reliability Program | Department of Energy Department of Energy Office of Electricity Delivery & Energy Reliability: Transmission Reliability Program U.S. Department of Energy Office of Electricity Delivery & Energy Reliability: Transmission Reliability Program The Transmission Reliability Program was established by Congress in 1999 to support a national laboratory/electricity industry partnership to conduct research on the reliability of the nation's

  2. Utility-scale grid-tied PV inverter reliability workshop summary report.

    SciTech Connect (OSTI)

    Granata, Jennifer E.; Quintana, Michael A.; Tasca, Coryne Adelle; Atcitty, Stanley

    2011-07-01

    A key to the long-term success of the photovoltaic (PV) industry is confidence in the reliability of PV systems. Inverters are the most commonly noted cause of PV system incidents triggered in the field. While not all of these incidents are reliability-related or even necessarily failures, they still result in a loss of generated power. With support from the U.S. Department of Energy's Solar Energy Technologies Program, Sandia National Laboratories organized a Utility-Scale Grid-Tied Inverter Reliability Workshop in Albuquerque, New Mexico, January 27-28, 2011. The workshop addressed the reliability of large (100-kilowatt+) grid-tied inverters and the implications when such inverters fail, evaluated inverter codes and standards, and provided discussion about opportunities to enhance inverter reliability. This report summarizes discussions and presentations from the workshop and identifies opportunities for future efforts.

  3. MEMS reliability: The challenge and the promise

    SciTech Connect (OSTI)

    Miller, W.M.; Tanner, D.M.; Miller, S.L.; Peterson, K.A.

    1998-05-01

    MicroElectroMechanical Systems (MEMS) that think, sense, act and communicate will open up a broad new array of cost effective solutions only if they prove to be sufficiently reliable. A valid reliability assessment of MEMS has three prerequisites: (1) statistical significance; (2) a technique for accelerating fundamental failure mechanisms, and (3) valid physical models to allow prediction of failures during actual use. These already exist for the microelectronics portion of such integrated systems. The challenge lies in the less well understood micromachine portions and its synergistic effects with microelectronics. This paper presents a methodology addressing these prerequisites and a description of the underlying physics of reliability for micromachines.

  4. WWW media distribution via Hopwise reliable multicast

    SciTech Connect (OSTI)

    Donnelley, J.E.

    1994-12-01

    Repeated access to WWW pages currently makes inefficient use of available network bandwidth. A Distribution Point Model is proposed where large and relatively static sets of pages (e.g. magazines or other such media) are distributed via bulk multicast to LAN distribution points for local access. Some access control issues are discussed. Hopwise Reliable Multicast (HRM) is proposed to simplify reliable multicast of non real time bulk data between LANs. HRM uses TCP for reliability and flow control on a hop by hop basis throughout a multicast distribution tree created by today`s Internet MBone.

  5. Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar 2 (PREDICTS 2)

    Broader source: Energy.gov [DOE]

    The SunShot Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar 2 (PREDICTS 2) program funds research in physics, chemistry, and advanced data analysis to gain a better understanding of how and why solar PV modules degrade. The resulting improved product tests – either outdoors after installation or during the manufacturing process – will enable evaluation of module reliability and improved prediction of performance over time.

  6. Project Profile: Physics-Based Reliability Models for Supercritical-CO2 Turbomachinery Components

    Broader source: Energy.gov [DOE]

    GE, under the Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar (PREDICTS) Program will be leveraging internally developed models to predict the reliability of hybrid gas bearing (HGB) and dry gas seal (DGS) components in the turboexpander of a supercritical CO2 turbine. The Bayesian model is to include phase changes, low cycle fatigue/high cycle fatigue, dynamic instabilities, and corrosion processes.

  7. Introduction to Administrative Programs that Mitigate the Insider Threat

    SciTech Connect (OSTI)

    Gerke, Gretchen K.; Rogers, Erin; Landers, John; DeCastro, Kara

    2012-09-01

    This presentation begins with the reality of the insider threat, then elaborates on these tools to mitigate the insider threat: Human Reliability Program (HRP); Nuclear Security Culture (NSC) Program; Employee Assistance Program (EAP).

  8. Defect tolerant transmission lithography mask

    DOE Patents [OSTI]

    Vernon, Stephen P.

    2000-01-01

    A transmission lithography mask that utilizes a transparent substrate or a partially transparent membrane as the active region of the mask. A reflective single layer or multilayer coating is deposited on the membrane surface facing the illumination system. The coating is selectively patterned (removed) to form transmissive (bright) regions. Structural imperfections and defects in the coating have negligible effect on the aerial image of the mask master pattern since the coating is used to reflect radiation out of the entrance pupil of the imaging system. Similarly, structural imperfections in the clear regions of the membrane have little influence on the amplitude or phase of the transmitted electromagnetic fields. Since the mask "discards," rather than absorbs, unwanted radiation, it has reduced optical absorption and reduced thermal loading as compared to conventional designs. For EUV applications, the mask circumvents the phase defect problem, and is independent of the thermal load during exposure.

  9. Wave transmission over submerged breakwaters

    SciTech Connect (OSTI)

    Kobayashi, N.; Wurjanto, A. )

    1989-09-01

    Monochromatic wave reflection and transmission over a submerged impermeable breakwater is predicted numerically by slightly modifying the numerical model developed previously for predicting wave reflection and run-up on rough or smooth impermeable slopes. The slight modification is related to the landward boundary condition required for the transmitted wave propagating landward. In addition to the conservation equations of mass and momentum used to compute the flow field, an equation of energy is derived to estimate the rate of energy dissipation due to wave breaking. The computed reflection and transmission coefficients are shown to be in agreement with available small-scale test data. The numerical model also predicts the spatial variation of the energy dissipation, the mean water level difference, and the time-averaged volume flux per unit width, although available measurements are not sufficient for evaluating the capabilities and limitations of the numerical model for predicting these quantities.

  10. Human Performance Modeling for Dynamic Human Reliability Analysis

    SciTech Connect (OSTI)

    Boring, Ronald Laurids; Joe, Jeffrey Clark; Mandelli, Diego

    2015-08-01

    Part of the U.S. Department of Energy’s (DOE’s) Light Water Reac- tor Sustainability (LWRS) Program, the Risk-Informed Safety Margin Charac- terization (RISMC) Pathway develops approaches to estimating and managing safety margins. RISMC simulations pair deterministic plant physics models with probabilistic risk models. As human interactions are an essential element of plant risk, it is necessary to integrate human actions into the RISMC risk framework. In this paper, we review simulation based and non simulation based human reliability analysis (HRA) methods. This paper summarizes the founda- tional information needed to develop a feasible approach to modeling human in- teractions in RISMC simulations.

  11. In Situ Transmission Electron Microscopy

    Office of Scientific and Technical Information (OSTI)

    In Situ Transmission Electron Microscopy Katherine Jungjohann & Yang Liu Sandia National Laboratories, Albuquerque, New Mexico 87185 cint.lanl.gov * Adjustable HT: 100-300 kV * EDAX EDS Detector * Gatan Tridiem GIF * ADF STEM Detector * HAADF STEM Detector * BF STEM Detector * 2.0 A resolution in TEM * 1.9 A resolution in STEM * High resolution videos using Gatan Ultrascan CCD camera * Simultaneous BF and HAADF STEM imaging * EDS and EELS mapping * Energy-filtered imaging Sample Preparation

  12. NREL: Transmission Grid Integration - Webmaster

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Webmaster Please enter your name and email address in the boxes provided, and then type your message below. When you are finished, click the "Send Message" button. NOTE: If you enter your email address incorrectly, we will be unable to reply. Your name: Your email address: Your message: Send Message Printable Version Transmission Grid Integration Home Issues Projects Research Staff Working with Us Publications Webinars Data & Resources News Did you find what you needed? Yes 1 No 0

  13. Midwest Transmission Workshop II Summary

    SciTech Connect (OSTI)

    Kevin Bryan

    2002-12-05

    OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

  14. Reliability Challenges for Solar Energy (Presentation)

    SciTech Connect (OSTI)

    Kurtz, S.

    2009-04-27

    PV industry can benefit from reliability testing experience of microelectronics industry . Si modules perform well in field; CdTe/CIGS must be sealed to moisture; CPV in product development stage.

  15. PV Module Reliability Research (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-06-01

    This National Center for Photovoltaics sheet describes the capabilities of its PV module reliability research. The scope and core competencies and capabilities are discussed and recent publications are listed.

  16. Sandia Energy - PV Reliability & Performance Model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15-06-01T20:13:00+00:00 This Web Demo model is a simplified "player" version of the Photovoltaic Reliability Performance Model (PV-RPM) currently in development at Sandia National...

  17. Reliability Issues for Photovoltaic Modules (Presentation)

    SciTech Connect (OSTI)

    Kurtz, S.

    2009-10-01

    Si modules good in field; new designs need reliability testing. CdTe & CIGS modules sensitive to moisture; carefully seal. CPV in product development stage; benefits from expertise in other industries.

  18. Light Water Reactor Sustainability Program: Integrated Program Plan |

    Energy Savers [EERE]

    Department of Energy Program: Integrated Program Plan Light Water Reactor Sustainability Program: Integrated Program Plan Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas- emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by more than 30% from 2009 to

  19. Selecting chemical treatment programs

    SciTech Connect (OSTI)

    Miller, J.E. )

    1988-09-01

    Many process equipment performance and reliability problems can be solved economically by the proper selection and application of chemical treatment programs. It is important to choose an experienced chemical vendor and to work closely with the vendor to develop a good chemical treatment program. This requires devoting sufficient manpower to ensure that the treatment program development is thorough and timely. After the treatment program is installed, the system operation and performance should be routinely monitored to ensure that expected benefits are achieved and unexpected problems do not develop.

  20. Dormant storage reliability assessments-data based

    SciTech Connect (OSTI)

    Merren, G.T.

    1981-01-01

    A relatively large amount of data pertaining to the performance of certain electronic parts after long periods of dormant storage has been collected and analyzed by the Reliability Department of Sandia National Laboratories. The failure models used by Sandia are presented and reliability assessments for selected electronic parts derived from these models and the measured performance data are provided. These data based assessments are compared to similar assessments derived from handbook calculations using the general data and models provided in the handbooks.

  1. Office of Electricity Delivery and Energy Reliability

    Energy Savers [EERE]

    Comments of Cisco Systems to Office of Electricity Delivery and Energy Reliability Department of Energy in Response to Request for Information: Addressing Policy and Logistical Challenges to Smart Grid Implementation Issued September 13, 2010 FR Doc. 2010-23251 November 30, 2010 Cisco Systems provides these Comments in response to the Request for Information ("RFI") issued by the Office of Electricity Delivery and Energy Reliability of the Department of Energy ("DOE") on

  2. Production Facility System Reliability Analysis Report

    SciTech Connect (OSTI)

    Dale, Crystal Buchanan; Klein, Steven Karl

    2015-10-06

    This document describes the reliability, maintainability, and availability (RMA) modeling of the Los Alamos National Laboratory (LANL) design for the Closed Loop Helium Cooling System (CLHCS) planned for the NorthStar accelerator-based 99Mo production facility. The current analysis incorporates a conceptual helium recovery system, beam diagnostics, and prototype control system into the reliability analysis. The results from the 1000 hr blower test are addressed.

  3. Reliability Technology earns prestigious Los Alamos award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reliability Technology earns award Reliability Technology earns prestigious Los Alamos award LANL has honored Michael Hamada, Harry Martz and a team of researchers with its first Richard Feynman Prize for Innovation Achievement. August 27, 2013 Terry Wallace, right, Los Alamos National Laboratory Principal Associate Director for Global Security, congratulates Harold Martz, second from right, and Michael Hamada for winning the Laboratory's first-ever Richard Feynman Prize for Innovation

  4. Gearbox Reliability Collaborative (GRC) Description and Loading

    SciTech Connect (OSTI)

    Oyague, F.

    2011-11-01

    This document describes simulated turbine load cases in accordance to the IEC 61400-1 Ed.3 standard, which is representative of the typical wind turbine design process. The information presented herein is intended to provide a broad understanding of the gearbox reliability collaborative 750kW drivetrain and turbine configuration. In addition, fatigue and ultimate strength drivetrain loads resulting from simulations are presented. This information provides the bases for the analytical work of the gearbox reliability collaborative effort.

  5. Reliability Technology earns prestigious Los Alamos Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reliability Technology earns prestigious Los Alamos Award Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:May 2016 all issues All Issues » submit Reliability Technology earns prestigious Los Alamos Award Technology transferred to Procter & Gamble basis for first-ever Feynman Prize September 1, 2013 Feynman Prize winners Michael Hamada, center, and Harry Martz, second from left, hold their Feynman Prizes during a recent awards

  6. System Reliability for LED-Based Products

    SciTech Connect (OSTI)

    Davis, J Lynn; Mills, Karmann; Lamvik, Michael; Yaga, Robert; Shepherd, Sarah D; Bittle, James; Baldasaro, Nick; Solano, Eric; Bobashev, Georgiy; Johnson, Cortina; Evans, Amy

    2014-04-07

    Results from accelerated life tests (ALT) on mass-produced commercially available 6” downlights are reported along with results from commercial LEDs. The luminaires capture many of the design features found in modern luminaires. In general, a systems perspective is required to understand the reliability of these devices since LED failure is rare. In contrast, components such as drivers, lenses, and reflector are more likely to impact luminaire reliability than LEDs.

  7. A Research Roadmap for Computation-Based Human Reliability Analysis

    SciTech Connect (OSTI)

    Boring, Ronald; Mandelli, Diego; Joe, Jeffrey; Smith, Curtis; Groth, Katrina

    2015-08-01

    The United States (U.S.) Department of Energy (DOE) is sponsoring research through the Light Water Reactor Sustainability (LWRS) program to extend the life of the currently operating fleet of commercial nuclear power plants. The Risk Informed Safety Margin Characterization (RISMC) research pathway within LWRS looks at ways to maintain and improve the safety margins of these plants. The RISMC pathway includes significant developments in the area of thermalhydraulics code modeling and the development of tools to facilitate dynamic probabilistic risk assessment (PRA). PRA is primarily concerned with the risk of hardware systems at the plant; yet, hardware reliability is often secondary in overall risk significance to human errors that can trigger or compound undesirable events at the plant. This report highlights ongoing efforts to develop a computation-based approach to human reliability analysis (HRA). This computation-based approach differs from existing static and dynamic HRA approaches in that it: (i) interfaces with a dynamic computation engine that includes a full scope plant model, and (ii) interfaces with a PRA software toolset. The computation-based HRA approach presented in this report is called the Human Unimodels for Nuclear Technology to Enhance Reliability (HUNTER) and incorporates in a hybrid fashion elements of existing HRA methods to interface with new computational tools developed under the RISMC pathway. The goal of this research effort is to model human performance more accurately than existing approaches, thereby minimizing modeling uncertainty found in current plant risk models.

  8. Cost estimation of HVDC transmission system of Bangkas NPP candidates

    SciTech Connect (OSTI)

    Liun, Edwaren Suparman

    2014-09-30

    Regarding nuclear power plant development in Bangka Island, it can be estimated that produced power will be oversupply for the Bangka Island and needs to transmit to Sumatra or Java Island. The distance between the regions or islands causing considerable loss of power in transmission by alternating current, and a wide range of technical and economical issues. The objective of this paper addresses to economics analysis of direct current transmission system to overcome those technical problem. Direct current transmission has a stable characteristic, so that the power delivery from Bangka to Sumatra or Java in a large scale efficiently and reliably can be done. HVDC system costs depend on the power capacity applied to the system and length of the transmission line in addition to other variables that may be different.

  9. Section 406 Renewable Energy and Electric Transmission Loan Guarantee

    Energy Savers [EERE]

    Department of Energy Section 3161 Rehiring Preference for Eligible Separated Employees Section 3161 Rehiring Preference for Eligible Separated Employees PDF icon Attachment 4 - Section 3161 Rehiring Preference for Eligible Separated Employees More Documents & Publications Involuntary Separation Plan Template General Workforce Restructuring Plan Template Workforce Restructuring Policy Program under ARRA | Department of Energy

    406 Renewable Energy and Electric Transmission Loan

  10. Physics-Based Stress Corrosion Cracking Component Reliability Model cast in an R7-Compatible Cumulative Damage Framework

    SciTech Connect (OSTI)

    Unwin, Stephen D.; Lowry, Peter P.; Layton, Robert F.; Toloczko, Mychailo B.; Johnson, Kenneth I.; Sanborn, Scott E.

    2011-07-01

    This is a working report drafted under the Risk-Informed Safety Margin Characterization pathway of the Light Water Reactor Sustainability Program, describing statistical models of passives component reliabilities.

  11. Primary Water Stress Corrosion Crack Morphology and Nondestructive Evaluation Reliability

    SciTech Connect (OSTI)

    Doctor, Steven R.; Schuster, George J.; Anderson, Michael T.

    2004-12-01

    A research program on primary stress corrosion crack (PWSCC) is being conducted by Pacific Northwest National Laboratory (PNNL). In this program, the material degradation problem in Alloys 600, 182, and 82 is being investigated with objectives that include compling a knowledge base on all cracking in nickel based materials at all degradation sites in nuclear power plants, assessing NDE methods using mockups to quantify the detection, sizing, and using mockups to quantify the detection sizing and characterization of tight cracks, and determining the role of welding processes in degradation. In this paper, the resuts of the initial literature searchs are presented. The relevant data on crack properties such as shape and orientation are presented and their impace on nondestructive evaluation (NDE) reliability is discussed.

  12. California - Establishing Transmission Project Review Streamlining...

    Open Energy Info (EERE)

    Regulatory Guidance - Supplemental Material: California - Establishing Transmission Project Review Streamlining DirectivesPermittingRegulatory GuidanceSupplemental Material...

  13. NREL: Measurements and Characterization - Transmission/Scanning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Electron Microscopy Transmission/Scanning Transmission Electron Microscopy In transmission electron microscopy (TEM), a thin sample, typically less than 200 nm, is bombarded by a highly focused beam of single-energy electrons. The beam has enough energy for the electrons to be transmitted through the sample, and the transmitted or scattered electron signal is greatly magnified by a series of electromagnetic lenses. The magnified signal may be observed by electron diffraction,

  14. Washington/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Avista, Pacificorp, Puget Sound Energy, Tacoma Public Utilities, Bonneville Power Administration, Columbia Grid, Northern Tier Transmission Group, and Seattle City...

  15. Agenda: Electricity Transmission and Distribution- East

    Broader source: Energy.gov [DOE]

    Quadrennial Energy Review Public Meeting in Newark, NJ. September 8, 2014. Electricity Transmission and Distribution - Eastern Interconnection

  16. Transmission Project Reporting FPA 216h

    Broader source: Energy.gov [DOE]

    A link to the searchable database of all transmission projects requiring Federal authorizations currently being tracked by DOE.

  17. Transmission Infrastructure: FERCs Role

    U.S. Energy Information Administration (EIA) Indexed Site

    power by reducing transmission congestion congestion - - promote capital investment in the promote capital investment in the enlargement, improvement, maintenance, enlargement, ...

  18. Final report : testing and evaluation for solar hot water reliability.

    SciTech Connect (OSTI)

    Caudell, Thomas P.; He, Hongbo; Menicucci, David F.; Mammoli, Andrea A.; Burch, Jay

    2011-07-01

    Solar hot water (SHW) systems are being installed by the thousands. Tax credits and utility rebate programs are spurring this burgeoning market. However, the reliability of these systems is virtually unknown. Recent work by Sandia National Laboratories (SNL) has shown that few data exist to quantify the mean time to failure of these systems. However, there is keen interest in developing new techniques to measure SHW reliability, particularly among utilities that use ratepayer money to pay the rebates. This document reports on an effort to develop and test new, simplified techniques to directly measure the state of health of fielded SHW systems. One approach was developed by the National Renewable Energy Laboratory (NREL) and is based on the idea that the performance of the solar storage tank can reliably indicate the operational status of the SHW systems. Another approach, developed by the University of New Mexico (UNM), uses adaptive resonance theory, a type of neural network, to detect and predict failures. This method uses the same sensors that are normally used to control the SHW system. The NREL method uses two additional temperature sensors on the solar tank. The theories, development, application, and testing of both methods are described in the report. Testing was performed on the SHW Reliability Testbed at UNM, a highly instrumented SHW system developed jointly by SNL and UNM. The two methods were tested against a number of simulated failures. The results show that both methods show promise for inclusion in conventional SHW controllers, giving them advanced capability in detecting and predicting component failures.

  19. NREL: Performance and Reliability R&D - PV Module Reliability Workshop

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PV Module Reliability Workshop NREL hosts an annual Photovoltaic Module Reliability Workshop (PVMRW) so that solar technology experts can share information leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology-both critical goals for moving PV technologies deeper into the electricity marketplace. 2017 Workshop The 2017 PVMRW is tentatively scheduled for Tuesday, February 28, to Thursday,

  20. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, R.B.

    1985-08-15

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  1. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, Russell B.

    1987-01-01

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  2. National Electric Transmission Congestion Study 2006 Eastern...

    Office of Environmental Management (EM)

    NERC and regional reliability standards Northeast Reliability Interconnect Project-adds a new 345 kV tie line between New England and New Brunswick to improve the transfer ...

  3. Automated manual transmission shift sequence controller

    DOE Patents [OSTI]

    Lawrie, Robert E.; Reed, Richard G.; Rausen, David J.

    2000-02-01

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  4. Automated manual transmission mode selection controller

    DOE Patents [OSTI]

    Lawrie, Robert E.

    1999-11-09

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  5. Defense Programs | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Programs Defense Programs One of the primary missions of NNSA is to maintain and enhance the safety, security and reliability of the U.S. nuclear weapons stockpile. NNSA, through its Office of Defense Programs, ensures that the U.S. nuclear arsenal meets the country's national security requirements and continues to serve its essential deterrence role. One of the primary missions of NNSA is to maintain and enhance the safety, security and reliability of the U.S. nuclear weapons stockpile. NNSA,

  6. Open Access Transmission and Renewable Energy Technologies

    SciTech Connect (OSTI)

    Porter, K.

    1996-09-01

    In April 1996, the Federal Regulatory Commission (PERC) approved Orders 888 and 889 and released a draft rule for public comment on capacity reservation tariffs (CRTs). Order No. 888 requires electric utilities to file transmission tariffs that would allow transmission access to third parties who want to conduct wholesale transactions, and Order No. 889 requires transmission-owning utilities to set up open access, same-time information systems (OASIS), using commercial software and Internet protocols. This paper discusses these Orders in detail, as well as some of the issues before FERC with implications for renewables, which include: transmission pricing; transmission terms and conditions; reassignment of transmission capacity; defining state and FERC jurisdiction over transmission and distribution; the pricing of ancillary services; and the adoption and implementation of independent system operators.

  7. Gearbox Reliability Collaborative Update: A Brief (Presentation)

    SciTech Connect (OSTI)

    Sheng, S.; Keller, J.; McDade, M.

    2012-01-01

    This presentation is an update on the Gearbox Reliability Collaborative (GRC) for the AWEA Wind Project Operations, Maintenance & Reliability Seminar. GRC accomplishments are: (1) Failure database software deployed - partners see business value for themselves and customers; (2) Designed, built, instrumented, and tested two gearboxes - (a) Generated unprecedented public domain test data from both field testing and dynamometer testing, (b) Different responses from 'identical' gearboxes, (c) Demonstrated importance of non-torque loading and modeling approach; and (3) Active collaborative, with wide industry support, leveraging DOE funding - Modeling round robin and Condition Monitoring round robin.

  8. Visual inspection reliability for precision manufactured parts

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    See, Judi E.

    2015-09-04

    Sandia National Laboratories conducted an experiment for the National Nuclear Security Administration to determine the reliability of visual inspection of precision manufactured parts used in nuclear weapons. In addition visual inspection has been extensively researched since the early 20th century; however, the reliability of visual inspection for nuclear weapons parts has not been addressed. In addition, the efficacy of using inspector confidence ratings to guide multiple inspections in an effort to improve overall performance accuracy is unknown. Further, the workload associated with inspection has not been documented, and newer measures of stress have not been applied.

  9. Owner/Operator Perspective on Reliability Customer Needs and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SERVICES AS RELIABLE AS THE SUN OwnerOperator Perspective on Reliability Customer Needs and Field Data Sandia National Laboratories Utility-Scale Grid-Tied PV Inverter Reliability...

  10. PP-76 The Vermont Electric Transmission Company | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Vermont Electric Transmission Company to construct, operate, and maintain transmission facilities at the U.S. - Canada Border. PDF icon PP-76 The Vermont Electric Transmission ...

  11. PP-22-4 British Columbia Transmission Corporation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 British Columbia Transmission Corporation PP-22-4 British Columbia Transmission Corporation Presidential permit authorizing British Columbia Transmission Corporation to ...

  12. Comments of New England Electric Transmission Corporation on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission ...

  13. Fact #850: December 8, 2014 Automatic Transmissions have closed...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    have closed the Fuel Economy Gap with Manual Transmissions Fact 850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions ...

  14. RAPID/BulkTransmission/Land Access | Open Energy Information

    Open Energy Info (EERE)

    RAPIDBulkTransmissionLand Access < RAPID | BulkTransmission(Redirected from RAPIDBulkTransmissionLeasing) Jump to: navigation, search RAPID Regulatory and Permitting...

  15. RAPID/BulkTransmission/Land Use | Open Energy Information

    Open Energy Info (EERE)

    RAPIDBulkTransmissionLand Use < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission...

  16. 2009 Electric Transmission Congestion Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the...

  17. Draft Chapter 4: Transmission Adequacy | Department of Energy

    Energy Savers [EERE]

    Draft Chapter 4: Transmission Adequacy Draft Chapter 4: Transmission Adequacy A robust interstate electric transmission network must be developed to enable our electricity future....

  18. Phase 2 Report: Oahu Wind Integration and Transmission Study...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project Phase 2 Report: Oahu Wind Integration and Transmission ...

  19. Oahu Wind Integration and Transmission Study (OWITS): Hawaiian...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands ...

  20. RAPID/BulkTransmission/Air Quality | Open Energy Information

    Open Energy Info (EERE)

    BulkTransmissionAir Quality < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission...

  1. RAPID/BulkTransmission/Water Use | Open Energy Information

    Open Energy Info (EERE)

    RAPIDBulkTransmissionWater Use < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission...

  2. Office of Electricity Delivery & Energy Reliability FY 2012 Budget...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Energy Reliability FY 2012 Budget Request Presentation Presentation by Patricia Hoffman of the Office of Electricity Delivery & Energy Reliability FY 2012 Budget Request....

  3. CHP SYSTEM AT FOOD PROCESSING PLANT INCREASES RELIABILITY AND...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CHP SYSTEM AT FOOD PROCESSING PLANT INCREASES RELIABILITY AND REDUCES EMISSIONS - CASE STUDY, 2015 CHP SYSTEM AT FOOD PROCESSING PLANT INCREASES RELIABILITY AND REDUCES EMISSIONS -...

  4. Characterizing wind power resource reliability in southern Africa...

    Office of Scientific and Technical Information (OSTI)

    DOE PAGES Search Results Published Article: Characterizing wind power resource reliability in southern Africa Title: Characterizing wind power resource reliability in southern...

  5. Microsoft PowerPoint - Sandia Inverter Systemic Reliability Presentati...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Topic Review * First Solar Plant & Location Overview * Overview of Reliability * Component ... Business Development Copyright 2013, First Solar, Inc. 7 Definition of Reliability ...

  6. Electro-thermal-mechanical Simulation and Reliability for Plug...

    Broader source: Energy.gov (indexed) [DOE]

    Electro-thermal-mechanical Simulation and Reliability for Plug-in Vehicle Converters and Inverters Electro-thermal-mechanical Simulation and Reliability for Plug-in Vehicle ...

  7. ORISE: Inter-rater Reliability brings Standardization to Scientific...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Standardization of Scientific Peer Reviews Inter-Rater Reliability (IRR): new initiative ... a new initiative termed "inter-rater reliability" or IRR. Although IRR may have a ...

  8. Guide to Using Combined Heat and Power for Enhancing Reliability...

    Broader source: Energy.gov (indexed) [DOE]

    can help improve the resiliency and reliability of key infrastructure. PDF icon Guide to Using Combined Heat and Power for Enhancing Reliability and Resiliency in Buildings, ...

  9. Reliability of Oak Ridge Facilities Grows (Journal Article) ...

    Office of Scientific and Technical Information (OSTI)

    Reliability of Oak Ridge Facilities Grows Citation Details In-Document Search Title: Reliability of Oak Ridge Facilities Grows No abstract prepared. Authors: Ekkebus, Allen E 1 + ...

  10. Competition and Reliability in North American Energy Markets...

    Office of Environmental Management (EM)

    have had a devastating effect on the reliability of the North American power system and ... concern being profits rather than reliability; 2) Expenditures and manpower have been ...

  11. Office of Electricity Delivery & Energy Reliability FY 2012 Budget...

    Energy Savers [EERE]

    & Energy Reliability FY 2012 Budget Request Presentation Office of Electricity Delivery & Energy Reliability FY 2012 Budget Request Presentation Presentation by Patricia Hoffman of ...

  12. Improving the Reliability and Resiliency of the US Electric Grid...

    Energy Savers [EERE]

    Improving the Reliability and Resiliency of the US Electric Grid: SGIG Article in Metering International, March 2012 Improving the Reliability and Resiliency of the US Electric Grid: ...

  13. Washington DC Reliability Requirements and the Need to Operate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005) ...

  14. Combined Heat and Power System Enables 100% Reliability at Leading...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enables 100% Reliability at Leading Medical Campus - Case Study, 2013 Combined Heat and Power System Enables 100% Reliability at Leading Medical Campus - Case Study, 2013 Thermal ...

  15. DOE Office of Electricity Delivery & Energy Reliability (OE)...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electricity Delivery & Energy Reliability (OE) Energy Storage Safety Workshop - Sandia ... DOE Office of Electricity Delivery & Energy Reliability (OE) Energy Storage Safety ...

  16. System Reliability Model for Solid-State Lighting Luminaires...

    Energy Savers [EERE]

    System Reliability Model for Solid-State Lighting Luminaires System Reliability Model for Solid-State Lighting Luminaires Lead Performer: RTI International - Research Triangle ...

  17. Competition and Reliability in North American Energy Markets...

    Broader source: Energy.gov (indexed) [DOE]

    effect on the reliability of the North American power system and constitute the ultimate root cause of the August 14, 2003" PDF icon Competition and Reliability in North ...

  18. Data Center Efficiency and IT Equipment Reliability at Wider...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Center Efficiency and IT Equipment Reliability at Wider Operating Temperature and Humidity Ranges Data Center Efficiency and IT Equipment Reliability at Wider Operating Temperature ...

  19. Thermal Stress and Reliability for Advanced Power Electronics...

    Broader source: Energy.gov (indexed) [DOE]

    Thermal Stress and Reliability for Advanced Power Electronics and Electric Machines Power Electronic Thermal System Performance and Integration Thermal Performance and Reliability ...

  20. Science-based MEMS reliability methodology. (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Science-based MEMS reliability methodology. Citation Details In-Document Search Title: Science-based MEMS reliability methodology. No abstract prepared. Authors: Walraven, Jeremy ...

  1. Analysis and Evaluation of the Operability and Reliability of...

    Office of Environmental Management (EM)

    and Evaluation of the Operability and Reliability of the Intrusion Detection and ... 7 Figure 6.2 Operability and Reliability Matrix ......

  2. Third Annual Continuous Reliability Enhancement for Wind (CREW...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Third Annual Continuous Reliability Enhancement for Wind (CREW) Database Report Now ... Twitter Google + Vimeo GovDelivery SlideShare Third Annual Continuous Reliability ...

  3. Fueling Robot Automates Hydrogen Hose Reliability Testing (Fact...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The test plan for the hose reliability project includes not only testing the repetitive ... Reference: "Robot-Powered Reliability Testing at NREL's ESIF." YouTube video. http:...

  4. The Business Case for Fuel Cells 2013: Reliability, Resiliency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Reliability, Resiliency & Savings The Business Case for Fuel Cells 2013: Reliability, Resiliency & Savings This report, compiled by Fuel Cells 2000 with support from the Fuel ...

  5. CHP SYSTEM AT FOOD PROCESSING PLANT INCREASES RELIABILITY AND...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SYSTEM AT FOOD PROCESSING PLANT INCREASES RELIABILITY AND REDUCES EMISSIONS - CASE STUDY, 2015 CHP SYSTEM AT FOOD PROCESSING PLANT INCREASES RELIABILITY AND REDUCES EMISSIONS - ...

  6. The Role of Advancements in Photovoltaic Efficiency, Reliability...

    Office of Environmental Management (EM)

    The Role of Advancements in Photovoltaic Efficiency, Reliability, and Costs The Role of Advancements in Photovoltaic Efficiency, Reliability, and Costs The Role of Advancements in ...

  7. "Increasing Solar Panel Efficiency And Reliability By Evaporative...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reliability By Evaporative Cooling" Inventors..--.. Lewis Meixler, Charles Gentile, Patricia Hillyer, Dylan Carpe, Jason Wang, Caroline Brooks The efficiency and reliability of ...

  8. Now Available: Smart Grid Investments Improve Grid Reliability...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Smart Grid Investments Improve Grid Reliability, Resilience, and Storm Responses (November 2014) Now Available: Smart Grid Investments Improve Grid Reliability, Resilience, and ...

  9. Smart Grid Update: Delivering More Reliable and Efficient Power...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Update: Delivering More Reliable and Efficient Power to the Nation's Capital Smart Grid Update: Delivering More Reliable and Efficient Power to the Nation's Capital March 6, 2014 - ...

  10. The Business Case for Fuel Cells 2013: Reliability, Resiliency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Business Case for Fuel Cells 2013: Reliability, Resiliency & Savings The Business Case for Fuel Cells 2013: Reliability, Resiliency & Savings This report, compiled by Fuel ...

  11. Electricity Reliability Council of Texas (ERCOT) | Open Energy...

    Open Energy Info (EERE)

    Electricity Reliability Council of Texas (ERCOT) Jump to: navigation, search The Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to 22 million...

  12. Microsoft PowerPoint - Sandia CREW 2013 Wind Plant Reliability...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Security Administration under contract DE-AC04-94AL85000. Wind Plant Reliability Benchmark September 2013 Continuous Reliability Enhancement for Wind (CREW)...

  13. Microsoft Word - Sandia CREW 2012 Wind Plant Reliability Benchmark...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2-7328 Unlimited Release September 2012 Continuous Reliability Enhancement for Wind (CREW) Database: Wind Plant Reliability Benchmark Valerie A. Peters, Alistair B. Ogilvie, Cody...

  14. Microsoft Word - Sandia CREW 2013 Wind Plant Reliability Benchmark...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3-7288 Unlimited Release September 2013 Continuous Reliability Enhancement for Wind (CREW) Database: Wind Plant Reliability Benchmark Valerie A. Hines, Alistair B. Ogilvie, Cody R....

  15. New report highlights key composite testing trends for more reliable...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    highlights key composite testing trends for more reliable and lower cost wind blade ... New report highlights key composite testing trends for more reliable and lower cost wind ...

  16. Now Available: Smart Grid Investments Improve Grid Reliability...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Improve Grid Reliability, Resilience, and Storm Responses (November 2014) Now Available: Smart Grid Investments Improve Grid Reliability, Resilience, and Storm Responses ...

  17. Physics of Reliability: Evaluating Design Insights for Component...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar (PREDICTS) Funding Opportunity Physics of Reliability: Evaluating Design Insights for ...

  18. Thermal Stress and Reliability for Advanced Power Electronics...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Thermal Performance and Reliability of Bonded Interfaces Physics of Failure of Electrical Interconnects Thermal Stress and Reliability for Advanced Power Electronics and Electric ...

  19. Case Study: Fuel Cells Increase Reliability at First National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Cells Increase Reliability at First National Bank of Omaha Technology Center Fuel cells are a viable primary power choice for data centers-they generate highly reliable ...

  20. The challenge of reliability in MEMS commercialization

    SciTech Connect (OSTI)

    Miller, W.M.; Tanner, D.M.; Miller, S.L.

    1998-09-01

    MicroElectroMechanical Systems (MEMS) that think, sense, act and communicate will open up a broad new array of cost-effective solutions only if MEMS is demonstrated to be sufficiently reliable. This could prove to be a major challenge if it is not addressed concurrently with technology development. There are three requirements for a valid assessment of reliability: statistical significance, identification of fundamental failure mechanisms and development of techniques for accelerating them, and valid physical models to allow prediction of failures during actual use. While these already exist for the microelectronics portion of such integrated systems, the real challenge lies in the less well-understood micromachine portions and its synergistic effects with microelectronics. This requires the elicitation of a methodology focused on MEMS reliability, which the authors discuss. A new testing and analysis infrastructure must also be developed to meet the needs of this methodology. They describe their implementation of this infrastructure and its success in addressing the three requirements for a valid reliability assessment.