Powered by Deep Web Technologies
Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

2014 Transmission Reliability Program Peer Review  

Broader source: Energy.gov [DOE]

The Transmission Reliability Program Peer Review included 20 presentations over 2 days on June 3 - 4, 2014 in Washington, DC. Presentations are available through the links. The agenda is available to download.

2

2014 Transmission Reliability Program Peer Review- Day 1 Presentations  

Broader source: Energy.gov [DOE]

The Transmission Reliability Program Peer Review included 6 sessions over 2 days on June 3 - 4. Presentations from Day 1 (Sessions I through IV) are available here.

3

2014 Transmission Reliability Program Peer Review- Day 2 Presentations  

Broader source: Energy.gov [DOE]

The Transmission Reliability Program Peer Review included 6 sessions over 2 days on June 3 - 4, 2014. Presentations from Day 2 (Sessions V and VI) are available here.

4

2010 Transmission Reliability Program Peer Review | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Reliability Program Peer Review Transmission Reliability Program Peer Review 2010 Transmission Reliability Program Peer Review The Transmission Reliability research area focuses on two key areas: 1) Real-Time Grid Reliability Management and 2) Reliability and Markets. The first area develops monitoring and analysis tools that process synchrophasor data to enable real-time assessment of grid status and stability margins, with the goal of improving power system reliability and visibility through wide-area measurement and control. It is developing advanced technologies and tools to help create a resilient electric transmission system that can better detect disturbances, accommodate a variety of generation sources, and automatically reconfigure the grid to prevent widespread outages and/or rebalance the system. The second area

5

2013 Transmission Reliability Program Peer Review | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Reliability Program Peer Review Transmission Reliability Program Peer Review 2013 Transmission Reliability Program Peer Review The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations are available through the individual session links. The agenda and introduction by Joe Eto, LBNL, are available below. Day 1: June 27 Session I Baselining Studies and Analysis, Bharat Bhargava, EPG Baselining Studies and Analysis, Brett Amidan, PNNL Synchrophasor Standards Support and Development, Ken Martin, EPG Session II Advanced Synchrophasor Metrology, Stan Hadley, ORNL GPS Issue Management, Mark Buckner, ORNL Technology Assessment for Next Generation PMU, Mark Buckner, ORNL Session III Measurement-Based Stability Assessment, Dan Trudnowski, U. Montana

6

2013 Transmission Reliability Program Peer Review - Day 2 Presentations |  

Broader source: Energy.gov (indexed) [DOE]

2 2 Presentations 2013 Transmission Reliability Program Peer Review - Day 2 Presentations The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations from Day 2 (Sessions V and VI) are available below. Session V: Ken Martin (EPG), Jim Thorp (Virginia Tech), Scott Ghiocel (RPI), Mani Venkatasubramanian (WSU) Session VI: Pete Sauer (U Illinois), Carlos Martinez (ASR), Gil Tam (EPG) 2013 TR Review - Data Validation & Conditioning - Ken Martin, EPG 2013 TR Review - Synchrophasor Data Conditioning and Validation - Jim Thorp, Virginia Tech 2013 TR Review - PMU-based Voltage Stability - Scott Ghiocel, Rensselaer Polytechnic Institute 2013 TR Review - Oscillation Monitoring System - Mani Venkatasubramanian,

7

2013 Transmission Reliability Program Peer Review - Day 2 Presentations |  

Broader source: Energy.gov (indexed) [DOE]

2 2 Presentations 2013 Transmission Reliability Program Peer Review - Day 2 Presentations The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations from Day 2 (Sessions V and VI) are available below. Session V: Ken Martin (EPG), Jim Thorp (Virginia Tech), Scott Ghiocel (RPI), Mani Venkatasubramanian (WSU) Session VI: Pete Sauer (U Illinois), Carlos Martinez (ASR), Gil Tam (EPG) 2013 TR Review - Data Validation & Conditioning - Ken Martin, EPG 2013 TR Review - Synchrophasor Data Conditioning and Validation - Jim Thorp, Virginia Tech 2013 TR Review - PMU-based Voltage Stability - Scott Ghiocel, Rensselaer Polytechnic Institute 2013 TR Review - Oscillation Monitoring System - Mani Venkatasubramanian,

8

2013 Transmission Reliability Program Peer Review - Day 1 Presentations |  

Broader source: Energy.gov (indexed) [DOE]

1 1 Presentations 2013 Transmission Reliability Program Peer Review - Day 1 Presentations The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Bharat Bhargava (EPG), Brett Amidan (PNNL), Ken Martin (EPG) Session II: Mark Buckner (ORNL) Session III: Dan Trudnowski (U Montana), Ning Zhou (PNNL) Session IV: Frank Tuffner (PNNL), Bernie Lesieutre (U Wisconsin), Harold Kirkham (PNNL), YC Zhang (NREL) 2013 TR Review - Eastern Interconnection Phase Angle Base Lining Study - Bharat Bhargava, EPG 2013 TR Review - Baselining Studies and Analysis - Brett Amidan, PNNL 2013 TR Review - Synchrophasor Standards Development and Support - Ken Martin, EPG

9

2013 Transmission Reliability Program Peer Review - Day 1 Presentations |  

Broader source: Energy.gov (indexed) [DOE]

1 1 Presentations 2013 Transmission Reliability Program Peer Review - Day 1 Presentations The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Bharat Bhargava (EPG), Brett Amidan (PNNL), Ken Martin (EPG) Session II: Mark Buckner (ORNL) Session III: Dan Trudnowski (U Montana), Ning Zhou (PNNL) Session IV: Frank Tuffner (PNNL), Bernie Lesieutre (U Wisconsin), Harold Kirkham (PNNL), YC Zhang (NREL) 2013 TR Review - Eastern Interconnection Phase Angle Base Lining Study - Bharat Bhargava, EPG 2013 TR Review - Baselining Studies and Analysis - Brett Amidan, PNNL 2013 TR Review - Synchrophasor Standards Development and Support - Ken Martin, EPG

10

Transmission Reliability | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

11

2012 CERTS Transmission Reliability R&D Internal Program Review - Agenda  

Broader source: Energy.gov (indexed) [DOE]

FY12 DOE - CERTS Transmission Reliability R&D FY12 DOE - CERTS Transmission Reliability R&D Internal Program Review June 12-13, 2012 LBNL Project Office 901 D St., SW Washington DC Nancy Lewis' cell: 510.918.3155 Revised Agenda: June 5, 2012 June 12, Day 1 7:30: Refreshments 8 - 8:30: Welcome, Introductions, DOE remarks Phil Overholt, DOE; Carl Imhoff, PNNL; Joe Eto, LBNL SESSION I: 20 minute presentations & 10 minutes Q&A 8:30 - 9: Measurement-Based Stability Assessment, Dan Trudnowski, University of Montana 9 - 9:30: Mode Meter Development, Ning Zhou, PNNL 9:30 - 10: Oscillation Monitoring System, Mani Venkatasubramanian, WSU 10 - 10:30: Break SESSION II: 20 minute presentations & 10 minutes Q&A 10:30 - 11: Baselining Studies and Analysis, Brett Amidan, PNNL

12

Human Reliability Program Overview  

SciTech Connect (OSTI)

This presentation covers the high points of the Human Reliability Program, including certification/decertification, critical positions, due process, organizational structure, program components, personnel security, an overview of the US DOE reliability program, retirees and academia, and security program integration.

Bodin, Michael

2012-09-25T23:59:59.000Z

13

Transmission Reliability | Department of Energy  

Energy Savers [EERE]

design, long-term supply and transmission investment, renewable integration, demand response, and environmental impacts. Researchers use models and simulations to assess how...

14

Human Reliability Program Workshop  

SciTech Connect (OSTI)

A Human Reliability Program (HRP) is designed to protect national security as well as worker and public safety by continuously evaluating the reliability of those who have access to sensitive materials, facilities, and programs. Some elements of a site HRP include systematic (1) supervisory reviews, (2) medical and psychological assessments, (3) management evaluations, (4) personnel security reviews, and (4) training of HRP staff and critical positions. Over the years of implementing an HRP, the Department of Energy (DOE) has faced various challenges and overcome obstacles. During this 4-day activity, participants will examine programs that mitigate threats to nuclear security and the insider threat to include HRP, Nuclear Security Culture (NSC) Enhancement, and Employee Assistance Programs. The focus will be to develop an understanding of the need for a systematic HRP and to discuss challenges and best practices associated with mitigating the insider threat.

Landers, John; Rogers, Erin; Gerke, Gretchen

2014-05-18T23:59:59.000Z

15

Transmission Reliability "Load as a Resource" Peer Review Materials...  

Broader source: Energy.gov (indexed) [DOE]

Transmission Reliability "Load as a Resource" Peer Review Materials Now Available Transmission Reliability "Load as a Resource" Peer Review Materials Now Available September 25,...

16

2013 Transmission Reliability R&D Peer Review Presentations Available |  

Broader source: Energy.gov (indexed) [DOE]

3 Transmission Reliability R&D Peer Review Presentations 3 Transmission Reliability R&D Peer Review Presentations Available 2013 Transmission Reliability R&D Peer Review Presentations Available September 9, 2013 - 3:25pm Addthis The agendas and presentations from the June and August 2013 Transmission Reliability R&D Program reviews are now available for download. The June 27-28 Transmission Reliability Program review combined the North American Synchrophasor Initiative (NASPI) and Advanced Application Development subprograms. The 2-day review included an overview of the program and six sessions of presentations from researchers funded by OE. The NASPI working group addresses the installation of synchrophasor networks across the United States with Recovery Act Smart Grid Investment Grant funds. Advanced Application Development projects include

17

Reliability evaluation for large-scale bulk transmission systems: Volume 1, Comparative evaluation, method development, and recommendations: Final report  

SciTech Connect (OSTI)

This volume (1 of 2) contains a comparative evaluation of existing transmission system reliability programs (SYREL, GATOR, RECS) and relevant mathematical methods for transmission reliability analysis. Several new and enhanced methods in the areas of network analysis, contingency selection, remedial action, and reliability index calculation, developed and tested during the project, are described. Recommendations for methods to be used in a production grade transmission reliability assessment program are presented. 69 figs., 41 tabs.

Lam, B.P.; Lawrence, D.J.; Reppen, N.D.; Ringlee, R.J.

1988-01-01T23:59:59.000Z

18

Reliability and Markets Program Information | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reliability and Markets Program Information Reliability and Markets Program Information Summary of the Tranmission Reliability program's Reliability and Markets activity area. The...

19

Gas-insulated substations: Reliability Research Program: Volume 1, Operational characteristics and recommendations: Final report  

SciTech Connect (OSTI)

This volume contains a comparative evaluation of existing transmission system reliability programs (SYREL, GATOR, RECS) and relevant mathematical methods for transmission reliability analysis. Several new and enhanced methods in the areas of network analysis, contingency selection, remedial action, and reliability index calculation, developed and tested during the project, are described. Recommendations for methods to be used in a production grade transmission reliability assessment program are presented. 49 figs., 11 tabs.

Boggs, S.A.; Chu, F.Y.; Collod, M.; Ford, G.L.; Fujimoto, N.; Harvey, S.; Stuckless, H.A.

1988-01-01T23:59:59.000Z

20

2014 DOE Human Reliability Program (HRP) Workshop | Department...  

Office of Environmental Management (EM)

DOE Human Reliability Program (HRP) Workshop 2014 DOE Human Reliability Program (HRP) Workshop August 18, 2014 - 7:51am Addthis 2014 DOE Human Reliability Program (HRP) Workshop...

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Customer Service Reliability Program Specialist  

Broader source: Energy.gov [DOE]

This position is located in Transmission Services Planning and Asset Management, in the Customer Service Engineering (TPC) organization. A successful candidate in this position will be a...

22

The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations  

SciTech Connect (OSTI)

Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

Kirby, Brendan J [ORNL

2006-07-01T23:59:59.000Z

23

Transmission Reliability "Load as a Resource" Peer Review Materials Now Available  

Broader source: Energy.gov [DOE]

OEs Transmission Reliability program is conducting R&D projects on Load as a Resource (LaaR) that explore how various types of customer loads could be turned on and off for short periods of time to provide services normally performed by generators. A program peer review was held on September 16, 2014. Materials including the agenda and presentations are now available.

24

Reliability modeling and evaluation of HVDC power transmission systems  

SciTech Connect (OSTI)

The objective of this paper is to present an improved computational method for evaluating the reliability indices of HVdc transmission systems. The developed models and computational techniques are described. These can be used to simulate the operational practices and characteristics of a system under study efficiently and realistically. This method is based on the failure modes and effects analysis and uses the event tree method and the minimal cut set approach to represent the system's operational behavior and deduce the appropriate system's failure modes. A set of five reliability indices is evaluated for each output node being analyzed together with the probability and frequency of encountering particular regions of system performance levels. The analysis of an assumed HVdc bipolar transmission system is also included.

Dialynas, E.N.; Koskolos, N.C. (National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering)

1994-04-01T23:59:59.000Z

25

LAMPF reliability history and program  

Science Journals Connector (OSTI)

Many years of service of the 800?MeV LAMPF H+/H? linac offers the opportunity to evaluate the long?term reliability characteristics of a high?power machine which with up to 800?kW beam power available is as close to an ADTT machine as exists in the world today. Records from the last 15 years of operation were analyzed for trends and areas of deteriorating reliability or disproportionate downtime and used to support engineering judgment on facility refurbishment to regain beam availability. This round of analysis has helped define a further level of detail and automation to be implemented in availability recording. Interesting features which emerge from the history include a clear measurement of the lower availability in the first operating cycle following extended maintenance periods and a consistent picture of the highest availability to be expected in extended operating periods with the facility as used and maintained. The results provide a starting point for informed discussion of reliability goals.

Olin van Dyck

1995-01-01T23:59:59.000Z

26

Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New  

Broader source: Energy.gov (indexed) [DOE]

Electric Power Transmission and Distribution (EPTD) Smart Grid Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New York) Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New York) < Back Eligibility Agricultural Commercial Construction Industrial Institutional Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Home Weatherization Solar Wind Program Info State New York Program Type Grant Program Provider New York State Energy Research and Development Authority Up to $10 million in funds is available from NYSERDA to support research and engineering studies, product development and demonstration projects that improve the reliability, efficiency, quality, and overall performance

27

Human Reliability Program (HRP) - HPMC Occupational Health Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Analysis Human Reliability Program (HRP) Industrial Rehabilitation & Ergonomics Infection Control & Immunizations Influenza Immunization Program Medical Exam Scheduling Medical...

28

Electricity Delivery and Energy Reliability PROGRAM DESCRIPTION  

Broader source: Energy.gov (indexed) [DOE]

2 2 Electricity Delivery and Energy Reliability PROGRAM DESCRIPTION The Office of Electricity Delivery and Energy Reliability (OE) leads national efforts to modernize the electric grid, enhance security and reliability of energy infrastructure, and facilitate recovery from disruptions to the energy supply. As stated in the President's A Policy Framework for the 21 st Century Grid, a smarter, modernized electric grid is fundamental to transforming the Nation's energy system and securing US leadership in a clean energy future. OE supports activities that enable innovation across the energy sector, empower American consumers, and secure our energy future. OE consists of three programs: Research and Development; Permitting, Siting and Analysis; and Infrastructure Security and Energy Restoration.

29

Federal Energy Management Program: Reliability-Centered Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reliability-Centered Maintenance to someone by E-mail Share Federal Energy Management Program: Reliability-Centered Maintenance on Facebook Tweet about Federal Energy Management Program: Reliability-Centered Maintenance on Twitter Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Google Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Delicious Rank Federal Energy Management Program: Reliability-Centered Maintenance on Digg Find More places to share Federal Energy Management Program: Reliability-Centered Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems

30

TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM  

E-Print Network [OSTI]

RFC: 793 TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM PROTOCOL SPECIFICATION September 1981 Admiralty Way Marina del Rey, California 90291 #12;#12;September 1981 Transmission Control Protocol TABLE ........................................... 12 2.9 Precedence and Security ...................................... 13 2.10 Robustness Principle

McBrien, Peter

31

CERTS 2012 Program Review - Automatic Reliability Reports (ARR) Research & Implementation - Carlos Martinez, ASR Inc.  

Broader source: Energy.gov (indexed) [DOE]

Reliability Reports (ARR) Reliability Reports (ARR) Grid Reliability Performance Metrics Using Model-Less Algorithms Prototype Development and Field Demonstration at MISO Carlos Martinez - Advanced Systems Researchers (ASR) June 12-13, 2012 Washington, D.C. FY12 DOE/NETL Transmission Reliability R&D Internal Program Review Page 0 Presentation Outline  Automatic Reliability Reports (ARR) Background  Grid Reliability Metrics Prototype Objectives  Technical Accomplishments during FY2012 and Next Action Items  Risk Factors Affecting Timely Completion  Follow up Work for FY13  Overview of prototype at MISO: Architecture, Grid Monitoring Visualization and Grid Reliability Tracking Grid Automatic Reliability Report (GARR) Page 1 Automatic Reliability Reports (ARR)

32

EIS-0285: Transmission System Vegetation Management Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

February 20, 2003 February 20, 2003 EIS-0285-SA-123: Supplement Analysis Transmission System Vegetation Management Program February 19, 2003 EIS-0285-SA-126: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-125: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-124: Supplement Analysis Transmission System Vegetation Management Program February 12, 2003 EIS-0285-SA-121: Supplement Analysis Transmission System Vegetation Management Program February 10, 2003 EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington January 16, 2003 EIS-0285-SA-117: Supplement Analysis Transmission System Vegetation Management Program December 24, 2002

33

EIS-0285: Transmission System Vegetation Management Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

July 19, 2002 July 19, 2002 EIS-0285-SA-96: Supplement Analysis Transmission System Vegetation Management Program, Snohomish District Substations July 19, 2002 EIS-0285-SA-70: Supplement Analysis Transmission System Vegetation Management Program July 9, 2002 EIS-0285-SA-81: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-84: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-80: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-78: Supplement Analysis Transmission System Vegetation Management Program June 21, 2002 EIS-0285-SA-75: Supplement Analysis Transmission System Vegetation Management Program May 31, 2002 EIS-0285-SA-58: Supplement Analysis

34

CERTS 2012 Program Review - Automatic Reliability Reports (ARR) Research & Implementation - Pete Sauer, U Illinois  

Broader source: Energy.gov (indexed) [DOE]

Grid Performance Metrics Using Model-less Algorithms Prototype Development and Field Test at MISO Pete Sauer - University of Illinois June 12-13, 2012 Washington D.C. FY12 DOE/NETL Transmission Reliability R&D Internal Program Review * Project objectives * Accomplishments this year * Deliverables and schedule * Risk factors affecting timely completion * Possible follow-on funding in FY 13 * Model-less algorithm description * Real data example * Issues * Post-contingency analysis Presentation Outline 1 * Provide automated reliability measures of closeness to operations limits with minimal model data * Verify adequacy and accuracy of voltage, thermal and stability transmission reliability metrics and model-less algorithms for automated reports

35

Reliability analysis of urban gas transmission and distribution system based on FMEA and correlation operator  

Science Journals Connector (OSTI)

In order to improve the safety management of urban gas transmission and distribution system, failure mode and effects analysis (FMEA) was used to construct the reliability analysis ... the risk priority number (R...

Su Li; Weiguo Zhou

2014-12-01T23:59:59.000Z

36

CERTS 2012 Program Review - Reliability Standards Analysis and Assessment - Gil Tam, EPG  

Broader source: Energy.gov (indexed) [DOE]

12-13, 2012 12-13, 2012 Washington, DC FY12 DOE/CERTS Transmission Reliability R&D Internal Program Review Research Projects Reliability Standards Analysis and Assessments  Frequency Response Event Collection and Analysis  NERC Interconnections 2011 Annual Grid Reliability Performance Analysis and Report Page 1 Reliability Standards Analysis and Assessment  Objective: Support the NERC committees/groups (Resource Subcommittee and RS- Frequency Working Group) in the following ways: - Perform grid reliability metrics analysis using data collected in CERTS applications as requested by the RS - Analyze collected data to assess reliability performance at different levels - Interconnection, Reliability Coordinator, Balancing Authority - Perform analysis, testing, and monitoring of current and proposed

37

Transmission line route selection by goal programming  

Science Journals Connector (OSTI)

A two-stage solution for transmission line route selection is presented. The generalized double-sweep method has been used to select the K least costly routes. The selected routes are subjected to social and environmental constraints (SEC). The SEC problem is formulated as a zero-one goal-programming model and solved by the implicit enumeration method. The two-stage solution algorithm has been applied to two problems. The results indicate the suitability of the method for route selection provided that acceptable SEC criteria can be found. The results also indicate the viability of the goal-programming technique for choosing power network interconnection concepts.

I.M. Elamin; S.O. Duffuaa; H.A. Yassein

1990-01-01T23:59:59.000Z

38

Development of a Successful Program in Reliability and Maintainability Engineering  

E-Print Network [OSTI]

­ Video or audio clips #12;Graduate Programs in Reliability Maintenance and EngineeringDevelopment of a Successful Program in Reliability and Maintainability Engineering Dr. Wes Hines Head, Nuclear Engineering College of Engineering The University of Tennessee jhines2@utk.edu UMD

Bernstein, Joseph B.

39

Comparison of reliability performance of group connected and conventional HVDC transmission systems  

SciTech Connect (OSTI)

A group connected HVDC transmission scheme is a variant of the unit connection where instead of a single generator, a group of generators are directly connected to the converter. Studies conducted in the past indicated that significant cost reduction can be achieved using this scheme. This is mainly due to the elimination of many components which results in considerable capital and operating cost savings to the utility. Concerns regarding the reliability performance of unit connected schemes were raised, however, there has not been a detailed reliability study conducted. This paper addresses the reliability evaluation aspect of a group connected scheme and compares the reliability performance of the group connected scheme with that of the conventional common collector system. Reliability models for both schemes were developed using a hypothetical system model based on the Nelson River system. Practical system component outage data was used to examine the reliability performance of both schemes.

Kuruganty, S. [Univ. of North Dakota, Grand Forks, ND (United States). Dept. of Electrical Engineering] [Univ. of North Dakota, Grand Forks, ND (United States). Dept. of Electrical Engineering

1995-10-01T23:59:59.000Z

40

Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.  

SciTech Connect (OSTI)

The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

SciTech Connect (OSTI)

California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

2008-07-01T23:59:59.000Z

42

Electric Utility Transmission and Distribution Line Engineering Program  

SciTech Connect (OSTI)

Economic development in the United States depends on a reliable and affordable power supply. The nation will need well educated engineers to design a modern, safe, secure, and reliable power grid for our future needs. An anticipated shortage of qualified engineers has caused considerable concern in many professional circles, and various steps are being taken nationwide to alleviate the potential shortage and ensure the North American power system's reliability, and our world-wide economic competitiveness. To help provide a well-educated and trained workforce which can sustain and modernize the nation's power grid, Gonzaga University's School of Engineering and Applied Science has established a five-course (15-credit hour) Certificate Program in Transmission and Distribution (T&D) Engineering. The program has been specifically designed to provide working utility engineering professionals with on-line access to advanced engineering courses which cover modern design practice with an industry-focused theoretical foundation. A total of twelve courses have been developed to-date and students may select any five in their area of interest for the T&D Certificate. As each course is developed and taught by a team of experienced engineers (from public and private utilities, consultants, and industry suppliers), students are provided a unique opportunity to interact directly with different industry experts over the eight weeks of each course. Course material incorporates advanced aspects of civil, electrical, and mechanical engineering disciplines that apply to power system design and are appropriate for graduate engineers. As such, target students for the certificate program include: (1) recent graduates with a Bachelor of Science Degree in an engineering field (civil, mechanical, electrical, etc.); (2) senior engineers moving from other fields to the utility industry (i.e. paper industry to utility engineering or project management positions); and (3) regular working professionals wishing to update their skills or increase their knowledge of utility engineering design practices and procedures. By providing graduate educational opportunities for the above groups, the T&D Program will help serve a strong industry need for training the next generation of engineers in the cost-effective design, construction, operation, and maintenance of modern electrical transmission and distribution systems. In addition to developing the on-line engineering courses described above, the T&D Program also focused significant efforts towards enhancing the training opportunities available to power system operators in the northwest. These efforts have included working with outside vendors to provide NERC-approved training courses in Gonzaga University's (GU) system operator training facility, support for an accurate system model which can be used in regional blackstart exercises, and the identification of a retired system operator who could provide actual regional training courses. The GU system operator training facility is also being used to recruit young workers, veterans, and various under-represented groups to the utility industry. Over the past three years students from Columbia Gorge Community College, Spokane Falls Community College, Walla Walla Community College, Central Washington University, Eastern Washington University, Gonzaga University, and various local high schools have attended short (one-day) system operator training courses free of charge. These collaboration efforts has been extremely well received by both students and industry, and meet T&D Program objectives of strengthening the power industry workforce while bridging the knowledge base across power worker categories, and recruiting new workers to replace a predominantly retirement age workforce. In the past three years the T&D Program has provided over 170 utility engineers with access to advanced engineering courses, been involved in training more than 300 power system operators, and provided well over 500 college and high school students with an experienc

Peter McKenny

2010-08-31T23:59:59.000Z

43

Installation of PV systems in GreeceReliability improvement in the transmission and distribution system  

Science Journals Connector (OSTI)

Photovoltaic (PV) power systems are becoming one of the most developing investment areas in the field of Renewable Energy Sources (RES). A statement of the status quo of PV power systems in Greece, and their contribution towards the improvement of power system reliability, is the scope of the present paper. Siting and installation of PV power systems is performed according to a recent Greek law, along with environmental and geographical constraints. Meteorological data are computed, formulated and imported to appropriate software in order to simulate the PV units and generate their power output. Data for unserved loads, resulting from load shedding during peak hours, are compared to the above estimated power production. Assuming that a proportion of the eventually unsupplied power could be provided by the accessed power generation of the PV units, the reliability of both transmission and distribution system is improved. The impact on the transmission system is shown by an improvement of LOLP and LOEP indices, whereas peak shaving for the Interconnected Greek Transmission System (IGTS) is also illustrated. For the distribution system the impact is quantified using the distribution system reliability indices SAIDI, SAIFI, and CAIDI. Finally, the resulting improvement is also expressed in financial terms.

Aggelos S. Bouhouras; Antonios G. Marinopoulos; Dimitris P. Labridis; Petros S. Dokopoulos

2010-01-01T23:59:59.000Z

44

The Reliability Investigation on ACSR Splice Connector Systems Used in Overhead Power transmission Lines  

SciTech Connect (OSTI)

Due to material discontinuity and inherited forming mechanism from a crimped-type splice connector, the associated conductor-connector system is highly sensitive to system components aging, especially during high-temperature operations. Furthermore, due to the increase in power demand and limited investment in new infrastructure, existing overhead power transmission lines often need to operate at temperatures higher than the original designed values. This has led to the accelerated aging and degradation of conductor-connector systems. The implications of connector aging are two-fold: (1) significant increase in resistivity of the splice connector and (2) significant reduction in the connector clamping strength. Therefore, splice connectors are one of the weakest links in the electric power transmission infrastructure. In this paper we will discuss the reliability of splice connector systems, including both single stage and two stage splice connectors, used in ACSR conductor of transmission lines under high temperature operations.

Wang, Jy-An John [ORNL] [ORNL; Jiang, Hao [ORNL] [ORNL; Ren, Fei [ORNL] [ORNL

2012-01-01T23:59:59.000Z

45

EIS-0285: Transmission System Vegetation Management Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

285: Transmission System Vegetation Management Program 285: Transmission System Vegetation Management Program EIS-0285: Transmission System Vegetation Management Program SUMMARY Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure I-1). The seven states offer a great diversity of vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and neighboring members of the public, and interfere with our ability to maintain these facilities. We need to keep vegetation a safe distance away from our electric power facilities and control noxious weeds at our

46

Achieving High Reliability Operations Through Multi-Program Integration  

SciTech Connect (OSTI)

Over the last 20 years the Idaho National Laboratory (INL) has adopted a number of operations and safety-related programs which has each periodically taken its turn in the limelight. As new programs have come along there has been natural competition for resources, focus and commitment. In the last few years, the INL has made real progress in integrating all these programs and are starting to realize important synergies. Contributing to this integration are both collaborative individuals and an emerging shared vision and goal of the INL fully maturing in its high reliability operations. This goal is so powerful because the concept of high reliability operations (and the resulting organizations) is a masterful amalgam and orchestrator of the best of all the participating programs (i.e. conduct of operations, behavior based safety, human performance, voluntary protection, quality assurance, and integrated safety management). This paper is a brief recounting of the lessons learned, thus far, at the INL in bringing previously competing programs into harmony under the goal (umbrella) of seeking to perform regularly as a high reliability organization. In addition to a brief diagram-illustrated historical review, the authors will share the INLs primary successes (things already effectively stopped or started) and the gaps yet to be bridged.

Holly M. Ashley; Ronald K. Farris; Robert E. Richards

2009-04-01T23:59:59.000Z

47

DOE Human Reliability Program Removals Report 2004-2006  

SciTech Connect (OSTI)

This report presents results of the comprehensive data analysis and assessment of all U.S. Department of Energy (DOE) and National Nuclear Security Administration (NNSA) facilities that have positions requiring workers to be certified in the Human Reliability Program (HRP). Those facilities include: Albuquerque, Amarillo, DOE Headquarters, Hanford, Idaho, Nevada, Oak Ridge, Oakland, and Savannah River. The HRP was established to ensure, through continuous review and evaluation, the reliability of individuals who have access to the DOEs most sensitive facilities, materials, and information.

Center for Human Reliability Studies

2007-02-01T23:59:59.000Z

48

A reliability cost-benefit analysis for HVDC transmission expansion planning  

SciTech Connect (OSTI)

A major portion of Manitoba Hydro's generation is located in the North on the Nelson River. The lower Nelson River generation is brought into the load centre in Southern Manitoba through an HVDC transmission system consisting of two bipoles, the first rated at 1680 MW at the rectifier and the second at 2000 MW. This paper presents the methodology used in arriving at the optimum Bipole 3 size using a reliability cost-benefit analysis. The analysis considers the forced outages of the generation and transmission systems using system outage statistics. The generator and valve group maintenance and the reduction in capability of thyristor valve groups during the summer season were also incorporated in the analysis. The load model used in the study was based on system data for the period 1980-1984. The criterion used in choosing the Bipole 3 size is to optimize the present worth value of the annual energy curtailment due to the HVDC system forced outages and the incremental installation cost of the transmission as the capacity of Bipole 3 is increased. The optimum Bipole 3 size based on the study is 2200 MW. This value is significantly lower than that based on a pole spare criterion used in the earlier development of the HVDC system. Finally, the need for validation of the outage data in evaluating future HVDC projects and the need for data collection and classification is indicated.

Kuruganty, P.R.S. (Manitoba Hydro, Winnipeg, Manitoba (CA)); Woodford, D.A. (Manitoba HVDC Research Centre, Winnipeg, Manitoba (CA))

1988-07-01T23:59:59.000Z

49

Accident Sequence Evaluation Program: Human reliability analysis procedure  

SciTech Connect (OSTI)

This document presents a shortened version of the procedure, models, and data for human reliability analysis (HRA) which are presented in the Handbook of Human Reliability Analysis With emphasis on Nuclear Power Plant Applications (NUREG/CR-1278, August 1983). This shortened version was prepared and tried out as part of the Accident Sequence Evaluation Program (ASEP) funded by the US Nuclear Regulatory Commission and managed by Sandia National Laboratories. The intent of this new HRA procedure, called the ''ASEP HRA Procedure,'' is to enable systems analysts, with minimal support from experts in human reliability analysis, to make estimates of human error probabilities and other human performance characteristics which are sufficiently accurate for many probabilistic risk assessments. The ASEP HRA Procedure consists of a Pre-Accident Screening HRA, a Pre-Accident Nominal HRA, a Post-Accident Screening HRA, and a Post-Accident Nominal HRA. The procedure in this document includes changes made after tryout and evaluation of the procedure in four nuclear power plants by four different systems analysts and related personnel, including human reliability specialists. The changes consist of some additional explanatory material (including examples), and more detailed definitions of some of the terms. 42 refs.

Swain, A.D.

1987-02-01T23:59:59.000Z

50

Transmission  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

51

ORISE 04-0115 Human Reliability Program Medical Assessments 2004  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ORISE 04-0115 ORISE 04-0115 Office of Security U. S. Department of Energy Human Reliability Program MEDICAL ASSESSMENTS Center for Human Reliability Studies Oak Ridge Institute for Science and Education Operated by Oak Ridge Associated Universities For the U. S. Department of Energy Oak Ridge Associated Universities (ORAU) is a university consortium leveraging the scientific strength of major research institutions to advance science and education by partnering with national laboratories, government agencies, and private industry. ORAU manages the Oak Ridge Institute for Science and Education for the U.S. Department of Energy (DOE). Oak Ridge Institute for Science and Education (ORISE) is a DOE facility focusing on scientific initiatives to research health risks from occupational hazards, assess environmental cleanup, respond to radiation medical

52

Section 406 Renewable Energy and Electric Transmission Loan Guarantee Program under ARRA  

Broader source: Energy.gov [DOE]

A temporary program for rapid deployment of renewable energy and electric power transmission projects.

53

Probabilistic Approach to Quantifying the Contribution of Variable Generation and Transmission to System Reliability: Preprint  

SciTech Connect (OSTI)

The increasing electrical load served by variable generation (VG), such as wind and solar energy, in the United States and many other countries has stimulated an interesting line of research to better quantify the capacity value of these resources. Methods applied traditionally to thermal units based on their average outage rates do not apply to VG because of their uncertain and non-dispatchable nature. The North American Electric Reliability Corporation's Integration of Variable Generation Task Force recently released a report that highlighted the need to develop and benchmark underlying loss-of-load expectation and related metrics that reasonably and fairly calculate the contribution to planning reserves, or capacity value, of solar and wind power. As the fraction of generation coming from VG becomes more significant, their estimated capacity value will have a larger impact on system planning. In this paper, we provide a method to include VG in traditional probabilistic-based adequacy methods. This method has been implemented in the Renewable Energy Probabilistic Resource Assessment tool developed at the National Renewable Energy Laboratory. Through an example based on the U.S. Western Interconnection, this method is applied to assess the effect that transmission can have on resource adequacy. We also analyze the interactions between available transmission and capacity value for VG.

Ibanez, E.; Milligan, M.

2012-09-01T23:59:59.000Z

54

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

kVlineisupgraded. TheTehachapiRenewableTransmissionTransmissionProjectandthePaloVerde/Harquahala?DeversNo. 2 500kVline

Budhraja, Vikram

2008-01-01T23:59:59.000Z

55

Audit Report - Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009  

Broader source: Energy.gov (indexed) [DOE]

Audit Report Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009 OAS-RA-13-26 June 2013 Department of Energy Washington, DC 20585 June 19, 2013 MEMORANDUM FOR THE ASSISTANT SECRETARY FOR ELECTRICITY DELIVERY AND ENERGY RELIABILITY FROM: Rickey R. Hass Deputy Inspector General for Audit and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009" BACKGROUND Under the American Recovery and Reinvestment Act of 2009 (Recovery Act), the Department of

56

Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.  

SciTech Connect (OSTI)

Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

57

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-15)  

SciTech Connect (OSTI)

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines. Work also includes clearing of a small (<1/4 mile) section of access road. All work will be in accordance with the National Electrical Safety Code and BPA standards. See Section 1.1 of the attached checklist for detailed information on each section of the referenced transmission lines. BPA will conduct the vegetation control with the goal of removing tall-growing vegetation that is currently or will soon be a hazard to the transmission lines and where possible to promote low-growing plant communities in the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The vegetation needing control is mainly Douglas Fir, Alder, and blackberries as indicated in Section 1.2 of the attached checklist. The work involved in the ROW includes: clearing tall growing vegetation that is currently or will soon pose a hazard to the lines; treating the associated stumps and re-sprouts with herbicide to ensure that the roots are killed preventing new sprouts; and selectively eliminating tall growing vegetation before it reaches a height or density to begin competing with low-growing vegetation. All work will take place in existing rights-of-ways and around transmission structures. All work will be accomplished by selective vegetation control methods to assure that there is little potential harm to non-target vegetation and to low-growing plants. The work will provide system reliability and fire protection. Also, all off right-of-way trees that are potentially unstable and will fall within a minimum distance or into the zone where the conductors swing will be removed. Access roads will be treated using mowing and herbicide applications. The work will provide system reliability. The subject transmission lines range from 115kV to 230kV and are made up of accompanying access roads, steel and wooden transmission line structures and associated switching platforms. The minimum clearance ranges from 21 feet for 115kV lines to 23 feet for 230kV lines. ROW easement widths vary along the length of the project. Vegetation control for this project is designed to provide a 3 year maintenance free interval. In summary, the overall vegetation management scheme will be to selectively remove tall growing vegetation then apply selective herbicide treatment using cut stump applications.

N /A

2001-06-19T23:59:59.000Z

58

2013 Reliability & Markets Peer Review | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2013 Reliability & Markets Peer Review 2013 Reliability & Markets Peer Review 2013 Reliability & Markets Peer Review The Transmission Reliability R&D Reliability & Markets Peer Review included 13 presentations over 2 days on August 6 - 7, 2013 at Cornell University in Ithaca, NY. Presentations are available through the links. The agenda and list of presentations are included below. The Reliability and Markets activity of the Transmission Reliability program researches, develops, and implements electricity infrastructure and market simulations that integrate economics and engineering principles. The activity helps to ensure electric reliability, while also improving the efficiency and economics of market operations. Day 1: August 6 Session I Transmission Investment Assessment Under Uncertainty, Ben Hobbs,

59

Relay coordination and protection failure effects on reliability indices in an interconnected sub-transmission system  

Science Journals Connector (OSTI)

Protection system failure is the main cause of cascading outages. It has been shown that the hidden failures lead to cascading outages. However, the effects of the coordination method as well as the hidden failure of the protection systems have not been investigated yet. In this paper, an algorithm based on sequential Monte Carlo simulation is proposed to find the reliability indices for different overcurrent relay coordination methods. The proposed algorithm is applied to the results of different relay coordination methods of a real network. The indices SAIFI, CAIDI, CAIFI and ENS for the results of different relay coordination methods are obtained strictly based on the contribution of the protection failure issues. Then, a comparison is made between the results of the different relay coordination methods in order to show how the coordination methods affect the reliability indices.

Kazem Mazlumi; Hossein Askarian Abyaneh

2009-01-01T23:59:59.000Z

60

Reliability Improvement Programs in Steam Distribution and Power Generation Systems  

E-Print Network [OSTI]

In the reliability and efficiency of the system. Recent studies have shownt hat more than 40% of all In stalled steam traps and 20% of certain types of valves need some form of corrective action. The majority of all high backpressure problems In condensate return... of the early 80's, energ~ I conservation was a buzzword. Excess funds were avall,8ble for high ROI projects and capital improvements were rpade to gain production efficiency. The increase in energy tosts and consumer spending triggered a moderate Increase...

Petto, S.

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Bringing you a prosperous future where energy is clean, abundant, reliable and affordable Industrial Technologies Program  

E-Print Network [OSTI]

Technologies Program A Strong Energy Portfolio for a Strong America Energy efficiency and clean, renewableBringing you a prosperous future where energy is clean, abundant, reliable and affordable Industrial Technologies Program U.S. Department of Energy Office of Energy Efficiency and Renewable Energy

Beckermann, Christoph

62

Economic analysis of the N-1 reliable unit commitment and transmission switching problem using duality concepts  

E-Print Network [OSTI]

is a result due to using linear generator costs. Figure 4linear scarcity rent over the time horizon for generator g.linear program and ? gt can be interpreted as the marginal value of an increase in capacity and is called the generator

ONeill, Richard P.; Hedman, Kory W.; Krall, Eric A.; Papavasiliou, Anthony; Oren, Shmuel S.

2010-01-01T23:59:59.000Z

63

Reliability-based maintenance evaluations and standard preventive maintenance programs  

SciTech Connect (OSTI)

Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the [open quotes]Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants[close quotes] prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated ([approximately]50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized.

Varno, M. (Vermont Yankee Nuclear Power Corp., Vernon, VT (United States)); McKinley, M. (Quadrex Energy Services Corp., Campbell, CA (United States))

1993-01-01T23:59:59.000Z

64

Bringing you a prosperous future where energy is clean, abundant, reliable and affordable Industrial Technologies Program  

E-Print Network [OSTI]

Bringing you a prosperous future where energy is clean, abundant, reliable and affordable Industrial Technologies Program U.S. Department of Energy Office of Energy Efficiency and Renewable Energy for a comprehensive, physics- based model of dimensional changes and hot tearing. Hot Tear #12;Industrial Technologies

Beckermann, Christoph

65

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

66

A nonlinear binary programming model for electric distribution systems reliability optimization  

Science Journals Connector (OSTI)

This paper presents a new nonlinear binary programming model aiming to minimize the SAIDI and SAIFI reliability indices of a distribution feeder. Graph theory and a contingency simulation-based technique are used in the explicit formulation of the objective functions to accurately model the protection system response to faults and system reconfiguration practices. To ensure the solutions feasibility both technical and economic constraints are considered. An alternative economic constraint is proposed, taking into account the current locations of the protective devices and sectionalizing switches, which directly affect the utility costs for reliability improvement. To solve the proposed model, an optimization technique based on the branch-and-bound algorithm is used in this paper. Hence, this technique enables deterministic optimization of distribution feeder reliability by identifying types and locations of protection devices and sectionalizing switches, so that SAIDI and SAIFI reliability indices are minimized. Test cases are presented to illustrate the reliability optimization of a test feeder considering the use of different protection schemes and cost constraints. A value-based reliability optimization formulation is derived from the proposed model and its application to the test feeder is also illustrated. Additionally, the solutions obtained from the proposed model are compared with the solutions obtained from two other state-of-the-art models found in the literature. A comparative study is also carried out to evaluate the efficiency of the genetic algorithm in solving the proposed models.

G.D. Ferreira; A.S. Bretas

2012-01-01T23:59:59.000Z

67

OFFICE OF FOSSIL ENERGY (FE) PROGRAMS ARE FOCUSED ON ACTIVITIES RELATED TO THE RELIABLE, EFFICIENT, AFFORDABLE  

Broader source: Energy.gov (indexed) [DOE]

OFFICE OF FOSSIL ENERGY (FE) PROGRAMS ARE FOCUSED ON OFFICE OF FOSSIL ENERGY (FE) PROGRAMS ARE FOCUSED ON ACTIVITIES RELATED TO THE RELIABLE, EFFICIENT, AFFORDABLE AND ENVIRONMENTALLY SOUND USE OF FOSSIL FUELS, AND ENHANC- ING U.S. ECONOMIC, ENVIRONMENTAL AND ENERGY SECURITY. FE MANAGES DOE'S FOSSIL ENERGY RESEARCH AND DEVELOPMENT (FER&D) PROGRAM, WHICH INCLUDES THE CLEAN COAL POWER INITIATIVE (CCPI); CARBON CAPTURE AND STORAGE (CCS) AND POWER SYSTEMS PROGRAM; ADVANCED ENERGY SYSTEMS; THE CROSSCUTTING RESEARCH ACTIVITY; AND NATURAL GAS TECHNOLOGIES R&D PROGRAM. IN ADDITION, FE OPERATES THE STRATEGIC PETROLEUM RESERVE (SPR), THE NORTHEAST HOME HEATING OIL RESERVE, NAVAL PETROLEUM AND OIL SHALE RESERVES (NPOSR) AND ELK HILLS SCHOOL LANDS FUND. EACH OF THESE ACTIVITIES IS IN A SEPARATE APPROPRIATIONS ACCOUNT. A DESCRIPTION OF MAJOR

68

July 24, 2009, Visiting Speakers Program - Regulation and High Reliability Organizations by Dr. Jerry Ellig  

Broader source: Energy.gov (indexed) [DOE]

and High Reliability and High Reliability Organizations Jerry Ellig Senior Research Fellow Prepared for the U.S. Department of Energy Office of Health, Safety, and Security Visiting Speakers Program National Academy of Public Administration July 24, 2009 High Reliability Organizations � "Avoid catastrophes in high-risk, complex operating environments ... consistently deliver year-in/year-out high value and high performance regardless of their operating environment." � Key principle: Reality isn't optional. Some examples � Airline and airport security � Electricity � Telecommunications � Finance and banking � Direct wine shipment (OK, maybe not an HRO, but it's a fun and illustrative story) Four suggestions 1. Base decisions on evidence of outcomes 2.

69

EIS-0097: Bonneville Power Administration Transmission Facilities Vegetation Management Program  

Broader source: Energy.gov [DOE]

The U.S. Department of Energys Bonneville Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with implementing a vegetation management program.

70

Human Reliability Program 10 CFR, part 712 Subpart B Medical Standards  

Broader source: Energy.gov [DOE]

HRP Policy is the responsibility of the Office of Departmental Personnel Security Policy (HS-1.4). The Office of Worker Safety and Health Assistance (HS-12), has responsibility within the DOE Human Reliability Programs (HRP) to ensure appropriate policies and procedures are in place and used at HQ and the DOE sites to monitor HRP-designated worker's health and fitness-for-duty.

71

Substation reliability -- Practical application and system approach  

SciTech Connect (OSTI)

Practical application of reliability analysis was made for the comparison of alternate line and bus arrangements of a future transmission substation with potential savings of up to $3.6 M. The paper describes how both the substation and the power system were simulated by using computer programs STAREL and COMREL. It presents the method used to obtain the most accurate estimates for the outage data of the system components. Finally, it expresses the results with simple reliability indices which can be meaningful for management. The results of the study show the need to include the reliability of the transmission system in a substation reliability evaluation.

Save, P. [Southern California Edison Co., Rosemead, CA (United States)] [Southern California Edison Co., Rosemead, CA (United States)

1995-02-01T23:59:59.000Z

72

Substation reliability -- Practical application and system approach  

SciTech Connect (OSTI)

Practical application of reliability analysis was made for the comparison of alternate line and bus arrangements of a future transmission substation with potential savings of up to 53.6 M. The paper describes how both the substation and the power system were simulated by using computer programs STAREL and COMREL. It presents the method used to obtain the most accurate estimates for the outage data of the system components. Finally, it expresses the results with simple reliability indices which can be meaningful for management. The results of the study show the need to include the reliability of the transmission system in a substation reliability evaluation.

Save, P. [Southern California Edison Co., Rosemead, CA (United States)

1994-12-31T23:59:59.000Z

73

(DOE/EIS-0285/SA-14): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/6/01  

Broader source: Energy.gov (indexed) [DOE]

4) 4) Bill Erickson - TFP/ Walla Walla Region Natural Resource Specialist Proposed Action: Vegetation Management at the Teakean Butte Microwave site. Location: Clearwater County, ID, Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove 28 danger trees and dense brush from the microwave site in order to provide a 75 -80 foot safety buffer for fire control and Microwave Beam path. The work will protect BPA's investment at the site and provide system reliability. All work will be in accordance with the National Electrical Safety Code and BPA standards. Analysis: This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision

74

New International Program to Asses the Reliability of Emerging Nondestructive Techniques (PARENT)  

SciTech Connect (OSTI)

The Nuclear Regulatory Commission (NRC) established the Program to Assess the Reliability of Emerging Nondestructive Techniques (PARENT) to follow on from the successful Program for the Inspection of Nickel alloy Components (PINC). The goal of the PARENT is to conduct a confirmatory assessment of the reliability of nondestructive evaluation (NDE) techniques for detecting and sizing primary water stress corrosion cracks (PWSCC) and applying the lessons learned from PINC to a series of round-robin tests. These open and blind round-robin tests will comprise a new set of typical pressure boundary components including dissimilar metal welds (DMWs) and bottom-mounted instrumentation penetrations. Open round-robin tests will engage research and industry teams worldwide to investigate and demonstrate the reliability of emerging NDE techniques to detect and size flaws with a wide range of lengths, depths, orientations, and locations. Blind round-robin tests will utilize various testing organizations, whose inspectors and procedures are certified by the standards for the nuclear industry in their respective countries, to investigate the ability of established NDE techniques to detect and size flaws whose characteristics range from relatively easy to very difficult for detection and sizing. Blind and open round-robin testing started in late 2011 and early 2012, respectively. This paper will present the work scope with reports on progress, NDE methods evaluated, and project timeline for PARENT.

Prokofiev, Iouri; Cumblidge, Stephen E.; Csontos, Aladar A.; Braatz, Brett G.; Doctor, Steven R.

2013-01-25T23:59:59.000Z

75

Human Reliability Program Semi-Structure Inteview Component ORISE-04-0116  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Office of Security U. S. Department of Energy HUMAN RELIABILITY PROGRAM Semi-Structured Interview Component Center for Human Reliability Studies Oak Ridge Institute for Science and Education Operated by Oak Ridge Associated Universities For the U. S. Department of Energy Oak Ridge Associated Universities (ORAU) is a university consortium leveraging the scientific strength of major research institutions to advance science and education by partnering with national laboratories, government agencies, and private industry. ORAU manages the Oak Ridge Institute for Science and Education for the U.S. Department of Energy (DOE). Oak Ridge Institute for Science and Education (ORISE) is a DOE facility focusing on scientific initiatives to research health risks from occupational hazards, assess environmental cleanup, respond to radiation medical

76

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35)  

Broader source: Energy.gov (indexed) [DOE]

14, 2001 14, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line ROW and the Mossy Rock-Chehalis Transmission Line ROW, between 7/1 to 27/10. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 162 feet. Location: The ROW is located in Lewis County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

77

A Monte Carlo tool for multi-node reliability evaluation  

E-Print Network [OSTI]

-Area Reliability Program(NARP) is based on the random sampling of generator and transmission line status for each hour. Monte Carlo Approach for Estimating Contingency Statistics along with the Evaluation Subroutine(MACS-ES) advances the generation...

Thalasila, Chander Pravin

2012-06-07T23:59:59.000Z

78

Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Quality Assurance Manual  

SciTech Connect (OSTI)

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment using a personal computer running the Microsoft Windows operating system. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC). The role of the INL in this project is that of software developer and tester. This development takes place using formal software development procedures and is subject to quality assurance (QA) processes. The purpose of this document is to describe how the SAPHIRE software QA is performed for Version 6 and 7, what constitutes its parts, and limitations of those processes.

C. L. Smith; R. Nims; K. J. Kvarfordt; C. Wharton

2008-08-01T23:59:59.000Z

79

2012 CERTS Transmission Reliability R&D Internal Program Review - Participant List  

Broader source: Energy.gov (indexed) [DOE]

Participants Participants Affliation 1 Alison Silverstein Guest 2 Anjan Bose CERTS, DOE 3 Bharat Bhargava CERTS 4 Bob Cummings Guest, NERC 5 Brett Amidan CERTS 6 Carl Imhoff CERTS 7 Carlos Martinez CERTS 8 Dan Sobajic Guest, Consultant 9 Dan Trudnowski Non-CERTS performer, Montana Tech 10 Daniel Kheloussi Guest, Energetics 11 Donald Davies Guest, WECC 12 Eddy Lim Guest, FERC 13 Gil Bindewald Guest, DOE 14 Gil Tam CERTS 15 Henry Huang CERTS 16 Isabelle Snyder CERTS 17 Jay Caspany Guest, DOE 18 Jeff Dagle CERTS 19 Jim Dyer CERTS 20 Jim McCalley CERTS 21 Joe Eto CERTS 22 Joe Gracia CERTS 23 John Pierre Guest/U of Wyoming 24 Ken Martin CERTS 25 Larry J Kezele Guest, NERC 26 Mahendra Patel Guest, PJM 27 Mani Venkatasubramanian CERTS, PSERC, WSU 29 Michael Razanousky Guest, NYSERDA 30 Nancy Lewis CERTS 31 Ning Zhou CERTS 32 Pete Sauer CERTS 33 Phil Overholt

80

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-09)  

SciTech Connect (OSTI)

BPA proposes to clear unwanted vegetation from the rights of way and access roads for BPA's McNary-Santiam No. 1 Transmission Line, beginning in the summer of 2000 and ending in July, 2001. This Supplemental Analysis finds that: (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285) and ROD; and (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.

N /A

2001-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Transmission Line Structure Spotting and Optimization within a Defined Transmission Line Routing Centerline Using Non-Linear Programming Models  

E-Print Network [OSTI]

and optimize structure heights for overhead transmission lines. The modeling tool will address common problems in determining overhead transmission line structure heights and locations. Some of the common problems consist of structure locations often having...

Cockrum, Joshua W.

2010-05-14T23:59:59.000Z

82

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40)  

Broader source: Energy.gov (indexed) [DOE]

9, 2002 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Allston-Keeler 500 kV Transmission Line ROW exclusive to BLM lands between 8/4 through 27/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 150 feet. Location: The ROW is located in Washington and Columbia County, in the State of Oregon, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

83

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-06)  

SciTech Connect (OSTI)

BPA proposes to apply selected herbicides to control annual weeds that are competing with native grasses that were seeded two years ago. Herbicides will also be applied at the base of the existing wooden transmission line poles located in the pasture area. BPA would conduct the vegetation control with the goal of promoting native grass growth and to provide fire protection for the wooden transmission line poles. The pasture area is, for the most part, flat with elevation increasing towards the northwest corner. Slopes are not steep in that area. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

N /A

2001-04-13T23:59:59.000Z

84

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-11)  

SciTech Connect (OSTI)

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

N /A

2001-05-15T23:59:59.000Z

85

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-12)  

SciTech Connect (OSTI)

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

N /A

2001-05-15T23:59:59.000Z

86

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-13)  

SciTech Connect (OSTI)

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

N /A

2001-06-06T23:59:59.000Z

87

Did geomagnetic activity challenge electric power reliability during solar cycle 23? Evidence from the PJM regional transmission  

E-Print Network [OSTI]

Did geomagnetic activity challenge electric power reliability during solar cycle 23? Evidence from of America, Washington, DC, 20064 USA Chris.StCyr@nasa.gov #12;Abstract During Solar Cycle 22, a very intense geomagnetic storm on 13 March 1989 contributed to the collapse of the Hydro-Quebec power system in Canada

Schrijver, Karel

88

Regional Transmission Planning Webinar | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

89

Field Operations Program Chevrolet S-10 (Lead-Acid) Accelerated Reliability Testing - Final Report  

SciTech Connect (OSTI)

This report summarizes the Accelerated Reliability testing of five lead-acid battery-equipped Chevrolet S-10 electric vehicles by the US Department of Energy's Field Operations Program and the Program's testing partners, Electric Transportation Applications (ETA) and Southern California Edison (SCE). ETA and SCE operated the S-10s with the goal of placing 25,000 miles on each vehicle within 1 year, providing an accelerated life-cycle analysis. The testing was performed according to established and published test procedures. The S-10s' average ranges were highest during summer months; changes in ambient temperature from night to day and from season-to-season impacted range by as much as 10 miles. Drivers also noted that excessive use of power during acceleration also had a dramatic effect on vehicle range. The spirited performance of the S-10s created a great temptation to inexperienced electric vehicle drivers to ''have a good time'' and to fully utilize the S-10's acceleration capability. The price of injudicious use of power is greatly reduced range and a long-term reduction in battery life. The range using full-power accelerations followed by rapid deceleration in city driving has been 20 miles or less.

J. Francfort (INEEL); J. Argueta; M. Wehrey (Southern California Edison); D. Karner; L. Tyree (Electric Transportation Applications)

1999-07-01T23:59:59.000Z

90

Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Data Loading Manual  

SciTech Connect (OSTI)

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory. This report is intended to assist the user to enter PRA data into the SAPHIRE program using the built-in MAR-D ASCII-text file data transfer process. Towards this end, a small sample database is constructed and utilized for demonstration. Where applicable, the discussion includes how the data processes for loading the sample database relate to the actual processes used to load a larger PRA models. The procedures described herein were developed for use with SAPHIRE Version 6.0 and Version 7.0. In general, the data transfer procedures for version 6 and 7 are the same, but where deviations exist, the differences are noted. The guidance specified in this document will allow a user to have sufficient knowledge to both understand the data format used by SAPHIRE and to carry out the transfer of data between different PRA projects.

C. L. Smith; K. J. Kvarfordt; S. T. Wood

2006-07-01T23:59:59.000Z

91

Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Data Loading Manual  

SciTech Connect (OSTI)

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory. This report is intended to assist the user to enter PRA data into the SAPHIRE program using the built-in MAR-D ASCII-text file data transfer process. Towards this end, a small sample database is constructed and utilized for demonstration. Where applicable, the discussion includes how the data processes for loading the sample database relate to the actual processes used to load a larger PRA models. The procedures described herein were developed for use with SAPHIRE Version 6.0 and Version 7.0. In general, the data transfer procedures for version 6 and 7 are the same, but where deviations exist, the differences are noted. The guidance specified in this document will allow a user to have sufficient knowledge to both understand the data format used by SAPHIRE and to carry out the transfer of data between different PRA projects.

C. L. Smith; K. J. Kvarfordt; S. T. Wood

2008-08-01T23:59:59.000Z

92

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70)  

Broader source: Energy.gov (indexed) [DOE]

(8-89) memorandum DATE: 7/19/02 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70) Bill Erickson - TFP/Walla Walla Natural Resource Specialist TO: Proposed Action: Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). Location: The ROWs are located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions.

93

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42)  

Broader source: Energy.gov (indexed) [DOE]

5, 2002 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Snohomish - Murray #1 from str 1\4 to str 18\5. The proposed work will be to remove both danger and reclaim trees outside and inside the right-of-way, respectively. Right-of-way width varies from 125 to 300 feet. Location: The ROW is located in Snohomish County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove both reclaim and danger trees inside and outside the transmission line right of way. BPA crews or contract crews will cut only trees that have

94

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Broader source: Energy.gov (indexed) [DOE]

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

95

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Broader source: Energy.gov (indexed) [DOE]

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

96

Thermoelectric Mechanical Reliability | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Thermoelectric Mechanical Reliability Thermoelectric Mechanical Reliability 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation...

97

Efficient and Reliable Reactive Power Supply and Consumption … Insights from an Integrated Program of Engineering and Economic Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

82 82 Efficient and Reliable Reactive Power Supply and Consumption - Insights from an Integrated Program of Engineering and Economic Research Robert J. Thomas, Timothy D. Mount, Richard Schuler, William Schulze, Ray Zimmerman, Fernando Alvarado, Bernard C. Lesieutre, Philip N. Overholt, and Joseph H. Eto Preprint version of paper Electricity Journal Energy Analysis Department Ernest Orlando Lawrence Berkeley National Laboratory 1 Cyclotron Road, MS 90R4000 Berkeley CA 94720-8136 Environmental Energy Technologies Division January 2008 http://eetd.lbl.gov/ea/EMS/EMS_pubs.html The work described in this report was coordinated by the Consortium for Electric Reliability, Technology Solutions and was funded under the Office of Electricity

98

Record of Decision for the Transmission System Vegetation Management Program (DOE/EIS-0285) (07/00)  

Broader source: Energy.gov (indexed) [DOE]

SYSTEM VEGETATION SYSTEM VEGETATION MANAGEMENT PROGRAM Record of Decision DOE/EIS-0285 Cooperating Agencies J U L Y 2 0 0 0 Bonneville Power Administration Transmission System Vegetation Management Program Record of Decision Table of Contents Summary of Decision .................................................................................................................................... 1 For Further Information .............................................................................................................................. 2 Background ................................................................................................................................................... 3 Decisions ........................................................................................................................................................

99

NREL: Gearbox Reliability Collaborative - Gearbox Reliability Collaborative  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Publications Publications Screenshot of the cover of an NREL report, titled Gearbox Reliability Collaborative Project Report: Findings from Phase 1 and Phase 2 testing. The NREL wind research program's Gearbox Reliability Collaborative publishes reports and presentations of its activities. General Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test Plan 2013 DOE/NREL Gearbox Reliability Collaborative: All Members Meeting Agenda 2012 Gearbox Reliability Collaborative Phase 1 and 2: Testing and Modeling Results 2012 Gearbox Reliability Collaborative Update: A Brief (Presentation) Jan 2012 Gearbox Reliability Collaborative Update (Presentation) April 2012 NREL Collaborates to Improve Wind Turbine Technology (Fact Sheet) 2012 Gearbox Reliability Collaborative - Phase 1 and 2 Overview

100

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap  

Broader source: Energy.gov (indexed) [DOE]

5, 2003 5, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap Tom Murphy Natural Resource Specialist - TFS/Bell-1 Proposed Action: Vegetation Management for the East Ellensburg Tap, 1/6 to 3/19 Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line with no easement width. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Kittatas County, WA being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear unwanted vegetation in the rights-of-ways and around transmission line structures that may impede the operation and maintenance of the

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

(DOE/EIS-0285/SA-127): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Broader source: Energy.gov (indexed) [DOE]

KEP/4 KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-127- Eugene-Alvey#2 Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Eugene-Alvey 115 kV transmission line from structure 7/1 through structure 12/2m, and along portions of the following adjacent transmission lines: Hawkins-Alvey 115KV and Alvey-Lane 115KV. Location: The project is located in the BPA Eugene Region in Lane County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to

102

(DOE/EIS-0285-SA-100): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 8/15/02  

Broader source: Energy.gov (indexed) [DOE]

5, 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-100) Joe Johnson Natural Resource Specialist TFS/Kalispell Proposed Action: Vegetation Management along the Libby-Conkelly, 1/2 to 26/4 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 125 feet to 250 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Lincoln and Flathead County, MT, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in

103

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-34) (12/3/01)  

Broader source: Energy.gov (indexed) [DOE]

3, 2001 3, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-34) Bill Erickson - TFP/Walla Walla Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the McNary-Ross Transmission Line ROW between 152/3+2120 to 153/4. The line is 345 kV Single Circuit Transmission Line (project includes adjacent N. Bonneville-Ross 230 kV Single Circuit Transmission Line) having a combined easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Skamania County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA).

104

(DOE/EIS-0285/SA-41): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Broader source: Energy.gov (indexed) [DOE]

February 27, 2002 February 27, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-41) William Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management around wood poles in Transmission Line ROW's in the Walla Walla Region (see attached checklist for identification). The proposed work will be accomplished in the indicated sections of the transmission line corridors with the easement width ranging from 0 to 200 feet. Location: The ROWs are located in Walla Walla Region (see checklist). Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation around

105

Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-08  

SciTech Connect (OSTI)

Clearing C-trees along the south side of the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The project involves controlling all tall growing trees (C-Trees) within the right-of-way. All work is to be done on the south side of centerline. Target vegetation is the tall growing Firs along the edge of the ROW, all of which is located within the back yards of the property owners along the right-of-way. The density of vegetation is low and consists of C-Trees located within backyards, with the branches growing towards the lines. Due to lack of access and past verbal agreements with the landowners, permission/agreement has been difficult to obtain from the property owners. Permission has now been obtained to remove the C-Trees within their back yards which, will soon be a hazard to our transmission line facility. We are working with the landowners to get them to plant low growing scrubs and ornamentals within the right-of-way and adjacent to the right-of-way. A follow up herbicide treatment is not planned because the trees being cut will not re-sprout. This right-of-way or project area is on a three to four year maintenance schedule. Little or no treatment should be required in the immediate future.

N /A

2001-04-23T23:59:59.000Z

106

Reliability Based Vegetation Management Through Intelligent System Monitoring  

E-Print Network [OSTI]

management programs for transmission lines operated at 200 kV and above are now subject to a reliability vegetation-caused outages. Programs for lower voltage lines are subject to state regulatory policies data that was utilized and referenced in this report. #12;ii Executive Summary Trees and other

107

2012 Transmission and Energy Storage Peer Review Presentations Available |  

Broader source: Energy.gov (indexed) [DOE]

2 Transmission and Energy Storage Peer Review Presentations 2 Transmission and Energy Storage Peer Review Presentations Available 2012 Transmission and Energy Storage Peer Review Presentations Available December 3, 2012 - 1:26pm Addthis Presentations from two peer reviews in September are now available. The Consortium for Electric Reliability Technology Solutions (CERTS) Transmission Reliability R&D Load as a Resource (LAAR) Program peer review included five presentations on September 20, 2012, hosted by DOE at the Lawrence Berkeley National Lab. DOE's Energy Storage Systems Program (ESS) conducted a peer review and update meeting in Washington, DC on September 26 - 28, 2012. The 3-day conference included nine sessions and two poster sessions. Addthis Related Articles 2013 Transmission Reliability R&D Peer Review Presentations Available

108

Systems Analysis Programs for Hands-on Intergrated Reliability Evaluations (SAPHIRE) Summary Manual  

SciTech Connect (OSTI)

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment (PRA) using a personal computer (PC) running the Microsoft Windows operating system. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC) and developed by the Idaho National Laboratory (INL). INL's primary role in this project is that of software developer and tester. However, INL also plays an important role in technology transfer by interfacing and supporting SAPHIRE users, who constitute a wide range of PRA practitioners from the NRC, national laboratories, the private sector, and foreign countries. SAPHIRE can be used to model a complex systems response to initiating events and quantify associated consequential outcome frequencies. Specifically, for nuclear power plant applications, SAPHIRE can identify important contributors to core damage (Level 1 PRA) and containment failure during a severe accident which lead to releases (Level 2 PRA). It can be used for a PRA where the reactor is at full power, low power, or at shutdown conditions. Furthermore, it can be used to analyze both internal and external initiating events and has special features for transforming an internal events model to a model for external events, such as flooding and fire analysis. It can also be used in a limited manner to quantify risk in terms of release consequences to the public and environment (Level 3 PRA). SAPHIRE also includes a separate module called the Graphical Evaluation Module (GEM). GEM is a special user interface linked to SAPHIRE that automates the SAPHIRE process steps for evaluating operational events at commercial nuclear power plants. Using GEM, an analyst can estimate the risk associated with operational events (for example, to calculate a conditional core damage probability) very efficiently and expeditiously. This report provides an overview of the functions available in SAPHIRE and presents general instructions for using the software. Section 1 presents SAPHIREs historical evolution and summarizes its capabilities. Section 2 presents instructions for installing and using the code. Section 3 explains the database structure used in SAPHIRE and discusses database concepts. Section 4 explains how PRA data (event frequencies, human error probabilities, etc.) can be generated and manipulated using change sets. Section 5 deals with fault tree operations, including constructing, editing, solving, and displaying results. Section 6 presents operations associated with event trees, including rule application for event tree linking, partitioning, and editing sequences. Section 7 presents how accident sequences are generated, solved, quantified, and analyzed. Section 8 discusses the functions available for performing end state analysis. Section 9 explains how to modify data stored in a SAPHIRE database. Section 10 illustrates how to generate and customize reports. Section 11 covers SAPHIRE utility options to perform routine functions such as defining constant values, recovering databases, and loading data from external sources. Section 12 provides an overview of GEMs features and capabilities. Finally, Section 13 summarizes SAPHIREs quality assurance process.

C. L. Smith

2008-08-01T23:59:59.000Z

109

(DOE/EIS-0285/SA-120): Supplement Analysis for the Transmission System Vegetation Management Program FEISq 2/10/03  

Broader source: Energy.gov (indexed) [DOE]

0, 2003 0, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-120 Hanford-Ostrander Corridor Maintenance William Erickson TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management for the Hanford-Ostrander Transmission Line Corridor from Tower 10/4 to Tower 17/2 + 770. The line is a 500kV Single Circuit Transmission Line having an easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as referenced on the attached checklist. Location: The subject right-of-way is located in Benton County, WA. In the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

110

(DOE/EIS-0285/SA-119): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/29/03  

Broader source: Energy.gov (indexed) [DOE]

9, 2003 9, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Snohomish-Murray No. 1 Transmission Line from structure 2/6 through structure 18/6. Right of way width is 95 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will

111

(DOE/EIS-0285/SA-122): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Broader source: Energy.gov (indexed) [DOE]

CSB-2 CSB-2 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-122- Bonneville-Alcoa Ed Tompkins, TFO/LMT Proposed Action: Vegetation Management for the Bonneville-Alcoa 115kV transmission line Location: The project is located in the BPA Olympia Region in Skamania and Clark Counties, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans

112

(DOE/EIS-0285/SA=32): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (11/15/01)  

Broader source: Energy.gov (indexed) [DOE]

November 15, 2001 November 15, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-32) Bill Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Re-vegetation Plot Study along the Lower Monumental-McNary Transmission Line ROW. The study area sections are located near structures 38/4 and 39/3. The line is a 500kV Single Circuit Transmission Line having an easement width of 165 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as indicated on the attached checklist. Location: The ROW is located in Walla Walla County, WA being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

113

(DOE/EIS-0285/SA-57): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/10/02  

Broader source: Energy.gov (indexed) [DOE]

0, 2002 0, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57) Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Trojan-Allston Transmission Lines 1 & 2 ROW between 1/1 and 9/1. The lines are 230 kV Single Circuit Transmission Lines having an easement width of 125 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

114

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20)(8/2/01)  

Broader source: Energy.gov (indexed) [DOE]

2, 2001 2, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20) Bill Erickson - TFP/Walla Walla - Natural Resource Specialist Jim Jellison - TFO/Olympia - Natural Resource Specialist Proposed Action: Vegetation Management along the McNary-Ross 161/1 to 166/5+346 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 175 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Clark County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

115

DOE/EIS-0285-SA-62: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (4/16/02)  

Broader source: Energy.gov (indexed) [DOE]

DATE April 16, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-62) Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Rocky Reach - Maple Valley No. 1 Transmission Line ROW from structure 98/2 to structure 110/1. The transmission line is a 500 kV line. Location: The ROW is located King County, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear targeted vegetation along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation management along existing access road and

116

(DOE/EIS-0285-126): Supplement Analysis for the Transmission System Vegetation Management Program 2/19/03  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-126- Alvey Fairview Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Alvey Fairview 230kV transmission line from structure 1/1 through structure 64/7. Location: The project is located in the BPA Eugene Region in Coos, Douglas, and Lane Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

117

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-33)(11/27/01)  

Broader source: Energy.gov (indexed) [DOE]

November 27, 2001 November 27, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS- 0285/SA-33) Bill Erickson - TFP/Walla Walla Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the St Helens-Allston Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line having an easement width of 100 feet. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear danger trees from varying widths of the indicated transmission line right-of-way that are approaching electrical clearance zones in accordance

118

(DOE/EIS-0285/SA-105): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (08/22/02)  

Broader source: Energy.gov (indexed) [DOE]

2, 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 105 Elbe Tap to Alder-LaGrande No. 1 James Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elbe Tap to Alder-LaGrande No.1 and 115kV transmission line from structure 1/1 through structure 7/17. Corridor width varies. The project area is located within Whatcom County, Washington. Location: Transmission line is located at and west of Elbe, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing

119

(DOE/EIS-0285/SA-55): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/12/02  

Broader source: Energy.gov (indexed) [DOE]

2, 2002 2, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-55) Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Raver - Paul No. 1 Transmission Line ROW from structure 15/5 to 29/3. The transmission line is a 500 kV line. Location: The ROW is located Pierce County, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line, including both Reclaim and Danger Trees. Also, access road clearing will be

120

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Broader source: Energy.gov (indexed) [DOE]

Statement Statement DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (DOE/EIS-0285) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy Cooperating Agencies: U.S. Forest Service (FS), U.S. Department of Agriculture; Bureau of Land Management (BLM), U.S. Department of Interior Title of Proposed Action: Transmission System Vegetation Management Program States Involved: California, Idaho, Montana, Oregon, Utah, Washington, and Wyoming Abstract: Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation.

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Central Wind Power Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities  

SciTech Connect (OSTI)

The report addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America.

Porter, K.; Rogers, J.

2009-12-01T23:59:59.000Z

122

Transmission planning for Indian power grid: a mixed integer programming approachp  

E-Print Network [OSTI]

) time-block (peak, intermediate, base) l index for transmission line voltage level (400, 220 and 132 kV transmission line, Rs/km LCAP power carrying capacity of an inter-state tie line for a particular voltage class, MW LF transmission loss factor per unit power transfer per km line length, MWh/MWh- km LGTH length

Dragoti-?ela, Eranda

123

Coming Full Circle in Florida: Improving Electric Grid Reliability and  

Broader source: Energy.gov (indexed) [DOE]

Coming Full Circle in Florida: Improving Electric Grid Reliability Coming Full Circle in Florida: Improving Electric Grid Reliability and Resiliency Coming Full Circle in Florida: Improving Electric Grid Reliability and Resiliency May 2, 2013 - 11:16am Addthis Inside Florida Power & Light's Transmission Performance Diagnostic Center. | Photo courtesy of Florida Power & Light. Inside Florida Power & Light's Transmission Performance Diagnostic Center. | Photo courtesy of Florida Power & Light. In 2009, at the DeSoto Next Generation Solar Energy Center, President Obama announced the launch of the $3.4 billion Smart Grid Investment Grant program. In 2009, at the DeSoto Next Generation Solar Energy Center, President Obama announced the launch of the $3.4 billion Smart Grid Investment Grant program. Inside Florida Power & Light's Transmission Performance Diagnostic Center. | Photo courtesy of Florida Power & Light.

124

Grid Reliability Performance Metrics Using Phasor Data and Model-less Algorithms,  

Broader source: Energy.gov (indexed) [DOE]

Reliability Performance Metrics Using Reliability Performance Metrics Using Phasor Data and Model-less Algorithms, Prototype Development and Field Test Carlos Martinez - Advanced Systems Researchers (ASR) cmartinez@asresearchers.com June 27-28 2013 Washington, DC DOE/OE Transmission Reliability Program 2 Project Objective LOAD-GENERATION CONTROL RELIABILITY PERFORMANCE REALTIME MONITORING GRID RELIABILITY PERFORMANCE PHASOR BASED AND MODELESS REALTIME MONITORING RESEARCH, PROTOTYPE AND FIELD TEST ALL APPLICATIONS IN PRODUCTION PROJECT OBJECTIVES 3 Project Analytics Approach 4 Accomplishments to be Completed in FY 2013 * Deliver to MISO the Extended Prototype Functional Specification * Complete Research, Test and Validation of Grid Post- Disturbance Reliability Metrics

125

Central Wind Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities: Revised Edition  

SciTech Connect (OSTI)

The report and accompanying table addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America. The first part of the table focuses on electric utilities and regional transmission organizations that have central wind power forecasting in place; the second part focuses on electric utilities and regional transmission organizations that plan to adopt central wind power forecasting in 2010. This is an update of the December 2009 report, NREL/SR-550-46763.

Rogers, J.; Porter, K.

2011-03-01T23:59:59.000Z

126

Thermoelectric Mechanical Reliability | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Thermoelectric Mechanical Reliability Thermoelectric Mechanical Reliability 2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting,...

127

(DOE/EIS-0285/SA-36): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (01/22/02)  

Broader source: Energy.gov (indexed) [DOE]

24, 2002 24, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-38) Benjamin J. Tilley - TFE/Alvey Proposed Action: Vegetation Management along the Wendson-Tahkenith #1 & #2 1/1-20/4, Tahkenitch-Gardiner #1/1-2/3 and Tahkenitch-Reedsport #1/1-4/2 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 100 feet. Location: The ROW is located in Douglas and Lane County, OR, being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

128

(DOE/EIS-0285/SA-43): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Broader source: Energy.gov (indexed) [DOE]

February 27, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Lower Monumental - McNary 57/2 to 63/5, and Radar Tap 0/4 to 0/10 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 165 and 80 feet respectively. Location: The ROW is located in Umatilla and Franklin County, OR, being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

129

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28)(9/5/01)  

Broader source: Energy.gov (indexed) [DOE]

September 5, 2001 September 5, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Port Angeles - Sappo No.1 Transmission Line ROW, from struture 1/1 to structure 42/10. Location: The ROW is located in Clallum County, WA, all in the Olympia Region. Proposed by: Bonneville Power Administration (BPA), Olympia Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

130

(DOE/EIS-0285/SA-75): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (06/21/02)  

Broader source: Energy.gov (indexed) [DOE]

June June 21, 2002 REPLY TO ATTN OF: KEP/Z-992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 75-Ross-Lexington. Jim Jellison -- - TFO/Olympia Ed Tompkins -- - TFO/Ross Proposed Action: Vegetation Management for the Ross Lexington Transmission Line. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove danger trees as well as unwanted vegetation in the rights-of-ways, along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and mitigation measures are discussed below. Planning Steps: 1. Identify facility and

131

(DOE/EIS-0285/SA-103): Supplemental Analysis for Transmission System Vegetation Management Program FEIS (August 12, 2002)  

Broader source: Energy.gov (indexed) [DOE]

2, 2, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-103-Keeler-Pennwalt). Jim Jellison - TFO/Olympia Ed Tompkins - TFO/Ross Proposed Action: Vegetation Management for the Keeler-Pennwalt transmission line and parts of the St. John-Keeler, Rivergate-Keeler, Keeler-Oregon City, & St. John-St. Helens lines. Location: Washington and Multnomah Counties, Oregon Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of-Ways along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action. Analysis: See the attached checklist for the

132

(DOE/EIS-0285/SA-59): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/19/02  

Broader source: Energy.gov (indexed) [DOE]

April 19, 2002 April 19, 2002 REPLY TO ATTN OF: KEP SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-59) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis Covington/ Raver Paul / Paul Alston 230 and 500 kV Transmission line Corridor ROW 48/2 to 70/6 and 1/1 to 13/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with a corridor width of 250 to 442 feet. Location: The ROW is located in Thurston County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

133

(DOE/EIS-0285/SA-02): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 3/9/01  

Broader source: Energy.gov (indexed) [DOE]

3/09/01 3/09/01 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-02) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Danger tree clearing on nine ROWs. Locations are: the Franklin-Badger Canyon #2; Hedges Tap; White Bluffs-Richland; Grandview-Richland; Badger Canyon-Richland; Franklin- Riverview; Taylor Flats Tap; Walla Walla-Pendleton; and McNary-Slatt Transmission lines. Location: All ROWs are located in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear danger trees from varying widths of the indicated transmission line rights-of way that are approaching electrical clearance zones in

134

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22)(8/17/01)  

Broader source: Energy.gov (indexed) [DOE]

August 17, 2001 August 17, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Chief Joseph - Snohomish No.3 and 4 Transmission Line ROW. From STR 94/1 to STR 113/1 Location: The ROW is located in King and Snohomish Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

135

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-23)(8/17/01)  

Broader source: Energy.gov (indexed) [DOE]

DATE: August 17, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-23) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Schultz - Raver No.1 and 2 from 60/3 to 75/5 and the Olympia - Grand Coulee from 70/2 to 70/5 Transmission Line ROW's. Location: The ROW is located in King County, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways, around tower structures, and along access roads that may impede the operation and maintenance of the subject transmission line. All work will be executed in accordance with the National Electrical Safety

136

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-26)(9/11/01)  

Broader source: Energy.gov (indexed) [DOE]

11, 2001 11, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-26) Ben Tilley - TFE/Alvey Natural Resource Specialist Proposed Action: Vegetation Management on Reedsport-Fairview #1 Transmission Line Structure 1/5 to 39/4. Location: All ROW are located in Coos and Douglas Counties, OR, all being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA), Eugene Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

137

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-17)(7/24/01)  

Broader source: Energy.gov (indexed) [DOE]

DATE: July 24, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-17) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along selected sections of the Schulz - Raver No.1, 2, 3 & 4, Olymplia - Grand Coulee NO. 1 Transmission Line ROW's. Location: The ROW's are located in Pierce and King Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be executed in accordance with the National Electrical Safety Code and BPA

138

Maximizing Energy Savings Reliability in BC Hydro Industrial Demand-side Management Programs  

E-Print Network [OSTI]

saving potential, and (5) a lack of organizational awareness of an operation's energy efficiency over efficiency requirements and pursuing demand-side management (DSM) incentive programs in the large industrial to investment in energy efficiency, and (2) requiring that incentive payments be dependent on measured energy

Victoria, University of

139

Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management approach that fosters low-growing plant communities.

N /A

2000-06-23T23:59:59.000Z

140

(DOE/EIS-0285/SA-08): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/23/01  

Broader source: Energy.gov (indexed) [DOE]

23, 2001 23, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-08 Don Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Clearing C-trees along the south side of the right-of-way. Location: Raver - Covington Line 1, between towers 6/5 and 7/2. Work will be performed in the State of Washington. Proposed by: BPA Snohomish Region. Analysis: This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). Planning Steps 1. Identify facility and the vegetation management need. The project involves controlling all tall growing trees (C-Trees) within the right-of-way. All

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Self-Reliability and Motivation in a Nuclear Security Culture Enhancement Program  

SciTech Connect (OSTI)

The threat of nuclear terrorism has become a global concern. Many countries continue to make efforts to strengthen nuclear security by enhancing systems of nuclear material protection, control, and accounting (MPC&A). Though MPC&A systems can significantly upgrade nuclear security, they do not eliminate the "human factor." This paper will describe some of the key elements of a comprehensive, sustainable nuclear security culture enhancement program and how implementation can mitigate the insider threat.

Crawford,C.; de Boer,G.; De Castro, K; Landers, Ph.D., J; Rogers, E

2009-10-19T23:59:59.000Z

142

Medical Aspects of Reliability  

SciTech Connect (OSTI)

This presentation covers the medical evaluation as part of a human reliability program, particularly the various medical qualifications and potential disqualifiers.

Atencio, Julian J.

2014-05-05T23:59:59.000Z

143

Programmed cell death correlates with virus transmission in a filamentous fungus  

Science Journals Connector (OSTI)

...transmission to a new or alternative host (Poulin 2000). 2. MATERIAL AND METHODS (a...uninfected conspecifics (Moore 1995; Poulin 2000). Some of these behavioural alterations...esis. Microbiol. Rev. 56, 561576. Poulin, R. 2000 Manipulation of host behaviour...

2002-01-01T23:59:59.000Z

144

Thermoelectric Mechanical Reliability | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Mechanical Reliability Thermoelectric Mechanical Reliability 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation...

145

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Broader source: Energy.gov (indexed) [DOE]

Purpose, Need and Issues Purpose, Need and Issues S-1 Summary In this summary: ΠPurpose, Need, and Issues ΠMethods and Their Impacts ΠPlanning Steps ΠProgram Alternatives and Their Impacts Purpose, Need and Issues Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 15,000 miles of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure S-1.) Those states offer a great diversity of vegetation (from trees to brush to grasses), which can interfere with electric power flow, pose safety problems for us and neighboring members of the public, or interfere with our ability to maintain our system. We need to keep vegetation a safe distance away from our electric power facilities and control

146

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25)(9/5/01)  

Broader source: Energy.gov (indexed) [DOE]

5, 2001 5, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25) Elizabeth Johnson - TFR/The Dalles Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along selected ROW sections of the Ostrander-Pearl transmission line. The ROWs include sections of the Ostrander-Pearl 500 kV line; the Ostrander-McLoughlin 500 kV line; the Big Eddy-Chemawa 230 kV line and the Big Eddy- McLoughlin 230 kV line. Location: The ROW is located in Clackamas County, Oregon, within the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights- of-way and around tower structures that may impede the operation and maintenance of the

147

DOE/EIS-0285-SA-50: Supplement Analysis for the Transmission Vegetation Management Program FEIS (3/15/02)  

Broader source: Energy.gov (indexed) [DOE]

2/27/01 1 2/27/01 1 United States Government Department of Energy Bonneville Power Administration DATE: March 15, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-50) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Grizzly-Summerlake (Structures 102/1-104/2) and Grizzly-Captain Jack (Structures 103/1-140/4) Transmission Line Corridors. Location: The project area lies east and northeast Klamath Falls, OR, and is located in Lake and Klamath Counties, Redmond Region. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the rights of

148

(DOE/EIS-0285/SA-04): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 3/27/01  

Broader source: Energy.gov (indexed) [DOE]

March 27, 2001 March 27, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-04) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Ponderosa - Pilot Butte 18/2 to 18/4 Relocation Location: The project area is in the City of Bend, OR, in Deschutes County. Proposed by: Bonneville Power Administration Description of the Proposed Action: BPA proposes to clear unwanted vegetation from a section of BPA's Ponderosa - Pilot Butte Transmission Line Right-of-way to facilitate relocation of structure 18/3. Work would begin in mid-March and end in April, 2001. Analysis: 1. Description of right-of-way and vegetation management needed: The project involves

149

(DOE/EIS-0285/SA-52): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (03/22/02)  

Broader source: Energy.gov (indexed) [DOE]

22, 2002 22, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-52) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on the Ashe-Marion #2 (138/1-150/2), Buckley- Marion (12/1-24/2), McNary-Santiam (109/1-119/3), and John Day-Marion (49/4-50/5) Transmission Line Corridors. Location: The project area lies between Maupin and Pine Grove Oregon, and is in the Redmond Region. The project area begins at on the Ashe-Marion at structure 138/1 and terminates at Wapinitia Road, Pine Grove. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the

150

(DOE/EIS-0285/SA-15): Supplement Analysis for the Transmission System Vegetation Manaement Program FEIS 6/19/01  

Broader source: Energy.gov (indexed) [DOE]

United States Government Department of Energy Bonneville Power Administration DATE: June 19, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-15) Jim Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation management on selected sections of ROWs in the Ross-St. John and Ross-Carborundum transmission line ROWs. The ROWs include sections of the Ross-St. John 230Kv line; the Ross-Rivergate 230Kv line; the Ross-Alcoa 115Kv line; the Ross-Carborundum 115Kv line and the Clark PUD 115Kv line. Location: The ROWs span sections of Vancouver Washington and Portland Oregon and are all

151

(DOE/EIS-0285/SA-07): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/18/01  

Broader source: Energy.gov (indexed) [DOE]

18, 2001 18, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-07) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management on section of three ROWs. The ROWs include selected sections of the McNary Powerhouse, the present and proposed new sections of the McNary-Roundup and the McNary Switchyard South Transmission lines. Location: All ROW are located east Umatilla, OR., all being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

152

(DOE/EIS-0285/SA-123): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/20/03  

Broader source: Energy.gov (indexed) [DOE]

20, 2003 20, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-123 Malin-Hilltop Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Malin-Hilltop (Structures 20/5-29/1). Location: The project area lies to the southeast of Klamath Falls, OR, and is located in Modoc County, California. Proposed by: Bonneville Power Administrationn (BPA) Description of the Proposed Action: Trees are located under and adjacent to conductors. Should a fire occur, these trees are a hazard to the line and could cause serious damage to the conductors, resulting in significant problems for the transmission grid. BPA plans on

153

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Broader source: Energy.gov (indexed) [DOE]

Statement - Appendices Statement - Appendices DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement DOE/EIS-0285 APPENDICES May 2000 Table of Contents Appendix A - Public Involvement: Publications Appendix B - Biological Weed Control Agents Appendix C - Bonneville Pesticide Applicator Certification Plan Appendix D - Sample Educational Information Appendix E - Clearance Criteria Appendix F - FS Mitigation Measures and Background Appendix G - BLM Mitigation Measures and Background Appendix H - Herbicide Fact Sheets 2,4-D Azafenidin Bromacil Chlorsulfuron Clopyralid Dicamba Dichlobenil Diuron Fosamine Ammonium Glyphosate Halosulfuron-methyl Hexazinone Imazapyr Isoxaben Mefluidide Metsulfuron-methyl

154

2014 Load as a Resource Program Peer Review  

Broader source: Energy.gov [DOE]

The Transmission Reliability R&D Load as a Resource (LaaR) Program peer review included 2 roundtable discussions and 4 presentations on September 16, 2014 at Lawrence Berkeley National Lab. Agenda and presentations are available.

155

Data Communication Principles Reliable Data Transfer  

E-Print Network [OSTI]

Principles Switching Reliable Data Transfer Data Rate of a Communication Channel Transmission Media Data Principles Switching Reliable Data Transfer Data Rate of a Communication Channel Transmission Media Data Transmission Fiber vs Copper Wire Weight vs bandwidth Cost Security 11 / 52 #12;Data Communication Principles

Ramkumar, Mahalingam

156

DOE/EIS-0285/SA-134: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (Bandon-Rogue-GoldBeach)(3/24/03)  

Broader source: Energy.gov (indexed) [DOE]

4, 2003 4, 2003 REPLY TO ATTN OF: KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-134-Bandon-Rogue-GoldBeach) Ben Tilley Natural Resource Specialist - TFE/Alvey Proposed Action: Vegetation Management for the Bandon-Rogue-Gold Beach transmission line corridor. This corridor includes the Bandon-Rogue #1 115 kV transmission line from Bandon Substation to Rogue Substation and the Rogue-Gold Beach #1 and #2 115kV transmission lines, starting at Rogue Substation and ending at Gold Beach Substation. In addition the project includes adjacent portions of the Fairview-Rogue #1 230 kV Transmission Line. Location: The project is located in the BPA Eugene Region, Coos and Curry Counties, Oregon.

157

(DOE/EIS-0285/SA-06): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/13/01  

Broader source: Energy.gov (indexed) [DOE]

4/13/01 4/13/01 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-06) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management of annual weeds on seven acres of Bonneville Power Administration (BPA) owned pastureland at the Walla Walla Substation. Location: The pastureland is adjacent to the Walla Walla Substation and is located east and north of the fenced substation, all within the BPA property boundary. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to apply selected herbicides to control annual weeds that are competing with native grasses that were seeded two years ago. Herbicides will also

158

(DOE/EIS-0285/SA-81): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 7/9/02  

Broader source: Energy.gov (indexed) [DOE]

July 9,2002 July 9,2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-81) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for fifteen Substations in The Dalles District. (See list of facilities under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within The Dalles District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what

159

(DOE/EIS-0285/SA-74): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 7/1/02  

Broader source: Energy.gov (indexed) [DOE]

2002 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-74) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for five Substations in the Malin District. (See list of facilities under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Malin District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what mitigation measures are required to protect those resources. In addition,

160

(DOE/EIS-0285/SA-82): Supplemental Analysis for Transmission System Vegetation Management Program FEIS (August 13, 2002)  

Broader source: Energy.gov (indexed) [DOE]

3,2002 3,2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-82 Jeffrey Hathhorn Redmond Deputy Regional Manager - TFI/IDAHO FALLS Proposed Action: Vegetation Management for twenty-four Substations in the Burley District. See list of facilities under planning step 1). Location: See list of facilities under Planning Step 1. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Burley District of the Idaho Falls Region. Analysis: The attached checklist shows the resources that were found during this analysis and what

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

(DOE/EIS-0285/SA-56): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/9/02  

Broader source: Energy.gov (indexed) [DOE]

09, 2002 09, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-56) 2ULRQ $OEUR 2O\PSLD 5HJLRQDO 0DQDJHU Proposed Action: Vegetation Management for the following electric yards located in the Ross District: Cape Horn North Bonneville Stevenson Carson Underwood Troutdale Cascade Locks Acton Ross 345kV and J.D. Alcoa Sifton St. Johns Ostrander McLoughlin Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to maintain a weed-free environment in the electrical substations located within the Olympia Region's Ross District. Description of the Proposal: BPA proposes to manage vegetation inside and around electrical

162

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-58) 5/31/02  

Broader source: Energy.gov (indexed) [DOE]

31, 2002 31, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-58) Bill Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management at the Lines Creek Microwave site. The proposed work will be accomplished within the fenced area of the facility. Location: The Lines Creek Microwave site is located at SWSW Section 33 T44N R2E within Shoshone County, Idaho, Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes bare ground vegetation management at the microwave site. Bare ground management is needed to prevent fire damage and maintain a vegetation free environment on the site.

163

(DOE/EIS-0285/SA-64): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/26/02  

Broader source: Energy.gov (indexed) [DOE]

6, 2002 6, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-64) Truman Conn - TFP Regional Manager, Walla Walla Region Proposed Action: Vegetation Management for Substations and Non-Electric Facilities in the Walla Walla Region (See Attachment A for a complete list of facilities) Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all graveled areas. These areas shall primarily be maintained with the use of herbicides. The management of vegetation outside the substation and associated facilities

164

(DOE/EIS-0285/SA-78): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (07/01/02)  

Broader source: Energy.gov (indexed) [DOE]

2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-78) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for ten Substations in the Redmond District. (See list of facilities listed under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Redmond District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what mitigation measures are required to protect those resources. In

165

(DOE/EIS-0285/SA-27): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 10/22/01  

Broader source: Energy.gov (indexed) [DOE]

October 22, 2001 October 22, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-27) Ben Tilley - TFE/Alvey Natural Resource Specialist Proposed Action: Vegetation Management along the Marion-Alvey #1 from structure 14/5 to 64/3 and the Marion-Lane #1 from structure 14/5 to 70/2. Both lines describe the same segment of ROW between structures 14/5 and 45/2. Location: All ROW are located in Marion, Linn, and Lane Counties, OR, all being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA), Eugene Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways, around tower structures, and associated access roads that may impede the operation and

166

EIS(DOE/EIS-0285/SA-61) Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/15/02  

Broader source: Energy.gov (indexed) [DOE]

April 15, 2002 April 15, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-61 Tom Murphy - TFS/Bell-1 - Natural Resource Specialist Proposed Action: Vegetation Management along the Bell-Boundary No.3, 84/4 to 96/1 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 100 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Stevens and Pend Oreille County, WA, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-

167

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-151-Big Eddy-Ostrander 1  

Broader source: Energy.gov (indexed) [DOE]

8, 2003 8, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-151-Big Eddy-Ostrander 1 Ed Tompkins Natural Resource Specialist-TFO/LMT Proposed Action: Removal of danger trees along the Big Eddy-Ostrander-1 transmission line corridor. This corridor also includes segments of the Big Eddy-Troutdale, Ostrander-Troutdale, Big Eddy-McLoughlin and Bid Eddy-Chemawa transmission lines. Referencing the Big-Eddy- Ostrander-1 transmission line, the project extends from tower 39/3 to 72/2. The portion of the ROW extending from 39/3 west to 44/5+313 falls within the Zigzag Ranger District of the Mt. Hood National Forest, Clackamas County, Oregon. All work conducted

168

(DOE/EIS-0285/SA 84): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Monroe-Custer No.1 7/1/02  

Broader source: Energy.gov (indexed) [DOE]

July July 1, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 84 Monroe-Custer No.l Don Atkinson -- - TFN/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No. 1500kV transmission line from structure 61/1 through structure 88/4. This project includes contemporaneous vegetation management along the Monroe-Custer No. 2 500kV and the Arlington-Bellingham 230kV transmission line corridors which run parallel to the subject transmission line. Corridor width varies from 140 to 825 feet. (All structure locations referenced in this SA refer to the Monroe-Custer No. 1.) The project area is located within Whatcom County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the

169

Hawaii electric system reliability.  

SciTech Connect (OSTI)

This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

Silva Monroy, Cesar Augusto; Loose, Verne William

2012-09-01T23:59:59.000Z

170

2014 Reliability & Markets Peer Review  

Broader source: Energy.gov [DOE]

The Transmission Reliability R&D Reliability & Markets Peer Review included 15 presentations over 2 days on August 5 - 6, 2014 at Cornell University in Ithaca, NY. Presentations are available through the links. The agenda and list of presentations are available to download.

171

North American Synchrophasor Initiative (NASPI) Program Information |  

Broader source: Energy.gov (indexed) [DOE]

North American Synchrophasor Initiative (NASPI) Program Information North American Synchrophasor Initiative (NASPI) Program Information North American Synchrophasor Initiative (NASPI) Program Information Summary of the Transmission Reliability program's North American Synchrophasor Initiative (NASPI) activity area. NASPI supports industry adoption of next-generation monitoring equipment to increase reliability and reduce costs for consumers through the development of secure, highspeed, time-synchronized data about bulk power system conditions. North American Synchrophasor Initiative (NASPI) Program Factsheet.pdf More Documents & Publications Synchrophasor Technologies and their Deployment in the Recovery Act Smart Grid Programs (August 2013) 2012 Advanced Applications Research & Development Peer Review - Day 1 Presentations

172

Electric Transmission and Distribution Future R&D Needs Planning, Operation, Control, and Visualization  

Broader source: Energy.gov (indexed) [DOE]

27-28, 2013 27-28, 2013 Washington, DC FY13 DOE/CERTS Transmission Reliability R&D Internal Program Review Research Projects Reliability Standards Analysis and Assessments  Frequency Response Event Collection and Analysis  NERC Interconnections 2012 Annual Grid Reliability Performance Analysis and Report Page 1 Reliability Standards Analysis and Assessment  Objective: Collect grid data and conduct grid reliability performance analysis to support the NERC committees/groups (Resources Subcommittee and RS- Frequency Working Group) in the following ways: - Perform grid reliability metrics analysis using data collected in CERTS applications as requested by the RS - Analyze collected data to assess reliability performance at different levels - Interconnection, Reliability Coordinator, Balancing Authority

173

Career Map: Power Systems/Transmission Engineer  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Power Systems and Transmission Engineer positions.

174

NREL: Energy Analysis: Transmission Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

175

Office of Electricity Delivery and Energy Reliability Recovery...  

Broader source: Energy.gov (indexed) [DOE]

Electricity Delivery and Energy Reliability Recovery Program Plan Office of Electricity Delivery and Energy Reliability Recovery Program Plan Microsoft Word - OE PSRP June 5 2009...

176

Reliability assessment of autonomous power systems incorporating HVDC interconnection links  

SciTech Connect (OSTI)

The objective of this paper is to present an improved computational method for the overall reliability assessment of autonomous power systems that may or may not contain HVdc interconnection links. This is a hybrid method based on a Monte-Carlo simulation sequential approach which incorporates an analytical approach for the reliability modeling of the HVdc transmission links. The developed models and techniques have been implemented into a computer program that can be used to simulate the operational practices and characteristics of the overall system under study efficiently and realistically. A set of reliability indices are calculated for each load-point of interest and the entire system while a set of additional indices is calculated for quantifying the reliability performance of the interconnection links under the specified operating requirements. The analysis of a practical system is also included for a number of studies representing its various operating and design characteristics.

Dialynas, E.N.; Koskolos, N.C. [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering] [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering; Agoris, D. [Public Power Corp., Athens (Greece)] [Public Power Corp., Athens (Greece)

1996-01-01T23:59:59.000Z

177

The real problem with Merchant transmission  

SciTech Connect (OSTI)

Current regulatory policy distinguishes transmission investments that have primarily economic benefits from those that primarily enhance reliability. But no such dichotomy exists; congestion and reliability are inter-related in complex ways. Thus, solving the transmission investment problem is more complex than ''fixing'' merchant transmission; investment in the grid must be treated as a systems problem. (author)

Blumsack, Seth; Lave, Lester B.; Ilic, Marija

2008-03-15T23:59:59.000Z

178

July 24, 2009, Visiting Speakers Program - The Next Generation of Regulation for High-Reliability Organizations by HON. John Bresland  

Broader source: Energy.gov (indexed) [DOE]

Next Generation of Regulation for Next Generation of Regulation for High-Reliability Organizations National Academy of Public Administration Washington, DC July 24, 2009 John Bresland Chairman United States Chemical Safety Board www.csb.gov What is a High Reliability Organization? * Management commitment * The right equipment * The right people * Standard procedures and training * Accountability * Employee feedback * Emergency response preparation * Leadership - must "walk the walk" www.csb.gov 2 * 3 www.csb.gov Are these HROs? www.csb.gov WEST PHARMACEUTICAL INVESTIGATION - 1/29/2003 www.csb.gov www.csb.gov 7 www.csb.gov Imperial Sugar Company Refinery, Port Wentworth, Georgia February 7, 2008 www.csb.gov 8 T2 Laboratories Jacksonville, Florida December 19, 2007 www.csb.gov www.csb.gov

179

(DOE/EIS-0285-SA-115): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Shelton-Fairmount # 1-4 12/20/02  

Broader source: Energy.gov (indexed) [DOE]

0, 0, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 115, Shelton- Fairmount # 1-4. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Shelton Fairmount # 1-4 230kV & 115kV transmission lines corridor from structure 34/3 through structure 60/2 (reference line ADNO 8354). Right of way width averages 258 feet. Location: The project area is located in Jefferson County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 26 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and

180

(DOE/EIS-0285/SA-121): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-121): 2/12/03  

Broader source: Energy.gov (indexed) [DOE]

2, 2003 2, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-121 Murry-Custer No. 1 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Murry-Custer No.1 transmission line from structure 1/1 through structure 6/2. Corridor width is 125 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 77.5 acres of right-of-way, 6 miles of access road, and 48 structure sites will be

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

(DOE/EIS-0285/SA-110): Supplement Analysis for the Transmission System Vegetation Management Program FEIS-Covington-Columbia No. 3) 10/2/02  

Broader source: Energy.gov (indexed) [DOE]

2, 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-110-Covington-Columbia No. 3 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Covington-Columbia No. 3, 230kV transmission lines from structure 1/1 through structure 12/1. Corridor width varies from 150 feet to 537.5 feet. The project area is located within King County, Washington. Location: The project area is located within King County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Approximately 568.4 acres of the right-of-way will be treated using selective and non-selective methods that include

182

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 129) Ashe-Marion #2 [Mile 150-157]  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 129 Ashe-Marion #2 [Mile 150-157] Elizabeth Johnson Natural Resource Specialist- TFR/The Dalles Proposed Action: Vegetation Management for the Ashe-Marion #2 500 kV transmission line from structure 150/2 through structure 157/7 (reference line). The Buckley-Marion #1 transmission line is also present within the proposed corridor. Right of way width averages 135 feet. Location: The project location is within Wasco County, Oregon near the city of Pine Grove, and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

183

(DOE/EIS-0285/SA-99): Supplement Analysis for the Transmission System Vegetation Management Program FEIS -Olympia-Grand Coulee No.1 8/29/02  

Broader source: Energy.gov (indexed) [DOE]

9, 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-99-Olympia-Grand Coulee No. 1 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Olympia-Grand Coulee No. 1, 287 kV transmission line from structure 53/4 through structure 64/1. Corridor width is 125 feet. Location: The project area is located within King County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Approximately 163 acres will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded

184

(DOE/EIS-0285/SA-114): Supplement Analysis for the Transmission System Vegetation Management Program EIS (Chehalis-Raymond #1, ADNO 8114) 12/5/02  

Broader source: Energy.gov (indexed) [DOE]

December December 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-114) (Chehalis-Raymond #1, ADNO 8114) Jim Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management for portion of the Chehalis-Raymond #1 115 kV transmission line Location: Project location is within Lewis and Pacific counties, Washington and is within the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources

185

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-132 (Big Eddy-Ostrander #1)(3/19/03)  

Broader source: Energy.gov (indexed) [DOE]

9, 2003 9, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-132 (Big Eddy-Ostrander #1) Libby Johnson Natural Resource Specialist - TFR/THE DALLES Proposed Action: Vegetation Management for portion of the Big Eddy - Ostrander #1 500 kV transmission line located from tower structure 31/2 to 39/3. Location: Project location is in BPA Redmond Region in Hood River County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete

186

(DOE/EIS-0285/SA-113-1): Supplement Analysis for the Transmission System Vegetation Management Program Updates 9/27/02 SA-113 12/2/02  

Broader source: Energy.gov (indexed) [DOE]

12/02/02 12/02/02 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program (DOE/EIS-0285/SA-113-1) Updates 9/27/02 SA-113 Bill Erickson, TFP/Walla Walla Natural Resource Specialist Proposed Action: To perform remedial vegetation management for keeping vegetation a safe distance away from electric power facilities and controlling noxious weeds within a section of BPA's Big Eddy-Ostrander Transmission Corridor. During a site review conducted in late fall of 2001, the inspector observed various species of hardwood trees resprouted from stumps. The new vegetative growth encroached on the required "Minimum Safe Distance" between the top of vegetation and the conductor cables. The management action is necessary to reduce the current and potential future hazards that tall- growing vegetation poses to transmission

187

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-149-Captain Jack-Malin #1)  

Broader source: Energy.gov (indexed) [DOE]

8, 2003 8, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-149-Captain Jack-Malin #1) Elizabeth Johnson Natural Resource Specialist - TFR/The Dalles Proposed Action: Vegetation Management for the Captain Jack-Malin #1 500 kV transmission line from structure 2/4 to Malin Substation (reference line). Right of way width averages 150 feet. Location: The project location is within Klamath County, Oregon near the city of Malin, and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors.

188

(DOE/EIS-0285/SA 118): Supplement Analysis for the Transmission System Vegetation Management Program EIS, Holcomb-Naselle 115kV)  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-SA 118, Holcomb - Naselle 115 kV. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. Right of way width averages 100 feet. Location: The project area is located in Pacific County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective

189

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-130- Keeler-Tillamook)(3/10/03)  

Broader source: Energy.gov (indexed) [DOE]

0, 2003 0, 2003 REPLY TO ATTN OF: KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-130- Keeler-Tillamook) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Keeler Tillamook 115 kV transmission line from structure 1/7 through structure 58/2, and along adjacent portions of the Keeler-Forest Grove #2 115KV transmission line. In addition the project includes 11miles of the 115KV Timber Tap. Location: The project is located in the BPA Eugene Region, Tillamook and Washington Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

190

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-146-Custer-Ingledow No.1&2  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-146-Custer-Ingledow No.1&2 Don Atkinson Natural Resource Specialist - TFN/Snohomish Proposed Action: Vegetation Management for portion of the Custer-Ingledow No.1&2 500 kV transmission line located from tower structure 1/4 to 9/6. Location: Project location is in BPA Snohomish Region in Whatcom County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete

191

SunZia Southwest Transmission Project Comments  

Energy Savers [EERE]

Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

192

(DOE/EIS-0285/SA-11): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Broader source: Energy.gov (indexed) [DOE]

1) 1) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Covington-Maple Valley No. 2 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 150 feet. The proposed work will be accomplished in selected sections along the entire transmission line corridor. Location: The ROW is located in King County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with

193

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-141- SalemAlbany #2)  

Broader source: Energy.gov (indexed) [DOE]

1- SalemAlbany #2) 1- SalemAlbany #2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Salem Albany #2 115 kV transmission line from Salem Substation to Albany Substation. Location: The project is located in the BPA Eugene Region, within Marion, Polk, and Benton Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission

194

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-140- SalemAlbany1)  

Broader source: Energy.gov (indexed) [DOE]

0- SalemAlbany1) 0- SalemAlbany1) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Salem Albany #1 115 kV transmission line from Salem Substation to Albany Substation. Location: The project is located in the BPA Eugene Region, Marion, Linn, and Benton County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission

195

DOE … NETL Internal Program Review … June 10, 2010  

Broader source: Energy.gov (indexed) [DOE]

OE TRANSMISSION RELIABILITY PROGRAM OE TRANSMISSION RELIABILITY PROGRAM North American Synchrophasor Initiative (NASPI) and Advanced Applications Research and Development (AARD) Internal Program Review June 27-28, 2013 L'Enfant Plaza Hotel | 480 L'Enfant Plaza Hotel SW, Washington, DC 20024 RENOIR ROOM-Second Floor Meeting logistics: Dana Robson, LBNL (cell: 415-335-1679) Draft Agenda Thursday, June 27 (Day 1) 7:30 am Morning refreshments available 8:00 am Welcome, Introductions, DOE remarks Joe Eto, Lawrence Berkeley National Laboratory Phil Overholt, US DOE, OE Transmission Reliability Program SESSION I (all sessions allow 20 minutes for presentations/10 minutes for Q&A) 8:30 am Baselining Studies and Analysis Bharat Bhargava, Electric Power Group 9:00 am Baselining Studies and Analysis

196

Electricity Reliability  

E-Print Network [OSTI]

Electricity Delivery and Energy Reliability High Temperature Superconductivity (HTS) Visualization in the future because they have virtually no resistance to electric current, offering the possibility of new electric power equipment with more energy efficiency and higher capacity than today's systems

197

Electric Transmission Line Siting Compact  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

198

DOE Transmission Capacity Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

199

(DOE/EIS-0285/SA-63): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, North Bonneville-Midway and Hanford-Ostrander 4/22/02  

Broader source: Energy.gov (indexed) [DOE]

2, 2002 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS, North Bonneville-Midway and Hanvor-Ostrander (DOE/EIS-0285/SA-63) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on the North Bonneville-Midway and Hanford- Ostrander transmission line right-of-way (approx. 702 acres). The project area begins at the North Bonneville Substation and terminates at structure 25/3+500. For most of the length of the right-of-way, the width is 300 feet wide on the North Bonneville-Midway Line and 150 feet wide for the Hanford- Ostrander Line. Location: The ROW is located in North Bonneville, Skamania County, OR, being in the

200

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-148- McNary Wildlife (McNary-Santiam #2))  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-148- McNary Wildlife (McNary-Santiam #2)) Mark Newbill - TFE/Chemawa Proposed Action: Joint project with US Forest Service for vegetation control for the McNary- Santiam #2 230 kV transmission line that enhances wildlife habitat under powerlines. Location: The project is located in the BPA Eugene Region within Marion County, Oregon. Proposed by: Bonneville Power Administration (BPA) in cooperation with US Forest Service. Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way by hand cutting or machine mowing. The overall goal is to remove small fir trees, brushy

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Evaluation of power system security and development of transmission pricing method  

E-Print Network [OSTI]

benefits in transmission services. The proposed method shows the transmission transaction cost of reliability benefits when transmission line capacities are considered. The ratio between allocation by transmission line capacity-use and allocation...

Kim, Hyungchul

2004-11-15T23:59:59.000Z

202

2014 Reliability & Markets Peer Review- Day 1 Presentations  

Broader source: Energy.gov [DOE]

The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 5 - 6, 2014. Presentations from Day 1 (Sessions I through IV) are available here.

203

The effect of Relay Protection on the Substation Reliability  

Science Journals Connector (OSTI)

This paper presents a model for evaluating the reliability of the substation actions after transmission grid faults. The model ... of different line protection systems by using the substation reliability model is...

Liisa Pottonen; Urho Pulkkinen

2004-01-01T23:59:59.000Z

204

Definition: Reliability Coordinator | Open Energy Information  

Open Energy Info (EERE)

Coordinator Coordinator Jump to: navigation, search Dictionary.png Reliability Coordinator The entity that is the highest level of authority who is responsible for the reliable operation of the Bulk Electric System, has the Wide Area view of the Bulk Electric System, and has the operating tools, processes and procedures, including the authority to prevent or mitigate emergency operating situations in both nextday analysis and real-time operations. The Reliability Coordinator has the purview that is broad enough to enable the calculation of Interconnection Reliability Operating Limits, which may be based on the operating parameters of transmission systems beyond any Transmission Operator's vision.[1] Related Terms transmission lines, Bulk Electric System, transmission line

205

Office of Electricity Delivery And Energy Reliability To Hold...  

Broader source: Energy.gov (indexed) [DOE]

Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission Office of Electricity Delivery And Energy...

206

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

207

Definition: Reliability Coordinator Area | Open Energy Information  

Open Energy Info (EERE)

Coordinator Area Coordinator Area Jump to: navigation, search Dictionary.png Reliability Coordinator Area The collection of generation, transmission, and loads within the boundaries of the Reliability Coordinator. Its boundary coincides with one or more Balancing Authority Areas.[1] Related Terms transmission lines, Reliability Coordinator, Balancing Authority Area, transmission line, balancing authority, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inlin LikeLike UnlikeLike You like this.Sign Up to see what your friends like. e Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Reliability_Coordinator_Area&oldid=502626" Categories: Definitions ISGAN Definitions What links here Related changes Special pages

208

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-144-Custer-Intalco #2)  

Broader source: Energy.gov (indexed) [DOE]

4-Custer-Intalco #2) 4-Custer-Intalco #2) Don Atkinson Natural Resource Specialist - TFN/SNOHOMISH Proposed Action: Vegetation Management for portion of the Custer-Intalco #2 230 kV transmission line located from tower structure 1/1 to 7/5. Location: Project location is in BPA Snohomish Region in Whatcom County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the right-of- way, along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and

209

(DOE/EIS-0285/SA-12): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Broader source: Energy.gov (indexed) [DOE]

2) 2) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Olympia-Grand Coulee No.1 Transmission Line ROW. Location: The ROW is located in Pierce and King Counties, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the

210

(DOE/EIS-0285//SA-80): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (07/01/02)  

Broader source: Energy.gov (indexed) [DOE]

SA80 SA80 Rocky Reach - Maple Valley Don Atkinson -- - TFN/Snohomish Bill Erickson -- - TFP/Walla Walla Proposed Action: Vegetation Management for USDA Forest Service Lands Along the Rocky Reach - Maple Valley Transmission Line. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along access roads and around tower structures on USDA Forest Service lands that may impede the operation and maintenance of the subject transmission line. See Section 1of the attached checklist for a complete description of the proposal. Analysis: Please see the attached checklist for the resources present. Applicable findings and mitigation measures are discussed below. Planning Steps: 1. Identify facility and the vegetation management need. Access roads (only) and tower sites (only) will be treated using non-selective methods

211

(DOE/EIS-0285/SA-125): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/18/03  

Broader source: Energy.gov (indexed) [DOE]

5 (Echo Lake-Maple Valley #1 [Mile 1-9], Adno 8258) 5 (Echo Lake-Maple Valley #1 [Mile 1-9], Adno 8258) Don Atkinson - TFN/SNOHOMISH Natural Resource Specialist Proposed Action: Vegetation Management for portion of the Echo Lake - Maple Valley #1 500 kV transmission line located from tower structure 1/1 to 9/2. Location: Project location is entirely within King county, Washington and is within the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of- Ways along access roads and around towers that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and

212

(DOE/EIS-0285/SA-13): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/6/01  

Broader source: Energy.gov (indexed) [DOE]

3) 3) James Jellison - TFO/Olympia Region - Natural Resource Specialist Bill Erickson - TFP/Walla Walla Region - Natural Resource Specialist Proposed Action: Vegetation Management along the Naselle Tarlett #1 and #2 transmission line Right of Way (ROW). Location: The ROW is located in Pacific County, WA, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of

213

(DOE/EIS-0285/SA-10): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Broader source: Energy.gov (indexed) [DOE]

0) 0) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Covington-Duwamish No. 1 ROW from the Covington Substation to tower 10/4. Location: The ROW is located in King County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to

214

Bibliography on transmission access issues  

SciTech Connect (OSTI)

This paper presents a bibliography on issues related to transmission access in electric power systems. There are 233 citations referenced in this bibliography. This bibliography presents a collection of selected literature on issues related to transmission access. It does not contain all of the material available on this subject or the categories contained herein. Some readers may feel that citations within this bibliography should be strictly limited to transmission system issues and not include energy pricing or reliability issues. However, it was the decision of the Subcommittee of the IEEE Task Force on Transmission Access and Nonutility Generation that selected entries relating to reliability and energy pricing, most relevant to transmission access, should be included. This decision was made because certain issues relating to reliability, transmission and energy pricing are perceived by the industry to be critical in the discussion of transmission access. The bibliography has been divided into the following sections or sub-sections: 2.0 Operational (Engineering) Issues, 3.0 Planning, 4.0 Reliability, 5.1 Economics: Costing, 5.2(a) Economics: Location-Differentiated Pricing, 5.2(b) Economics: Time-Differentiated Pricing, 5.3 Economics: Brokering, Bidding, and Auctioning, 6.0 Regulatory, and 7.0 General. Although the content of many publications spanned two or more of these sections, the desire to limit document length required that all publications be placed in the single most appropriate section. Publications are sorted according to author or publication resource.

Lankford, C.B. [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States)] [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States); McCalley, J.D. [Iowa State Univ., Ames, IA (United States)] [Iowa State Univ., Ames, IA (United States); Saini, N.K. [Entergy Services Corp., Metairie, LA (United States)] [Entergy Services Corp., Metairie, LA (United States)

1996-02-01T23:59:59.000Z

215

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

216

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric  

Broader source: Energy.gov (indexed) [DOE]

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development activities for the electric transmission and distribution system. OE has prepared this program plan pursuant to the requirements of Section 925 of the Energy Policy Act of 2005 (EPACT), as outlined below. This plan delineates research directions and priorities. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs.

217

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric  

Broader source: Energy.gov (indexed) [DOE]

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development activities for the electric transmission and distribution system. OE has prepared this program plan pursuant to the requirements of Section 925 of the Energy Policy Act of 2005 (EPACT), as outlined below. This plan delineates research directions and priorities. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs.

218

Sandia National Laboratories: Continuous Reliability Enhancements...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Renewable Energy, SMART Grid, Systems Analysis, Transmission Grid Integration, Wind Energy The U.S. Department of Energy Wind Program and Sandia have been working with...

219

North American Electric Reliability Corporation (NERC): Reliability  

Broader source: Energy.gov (indexed) [DOE]

Corporation (NERC): Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid. NERC develops and enforces Reliability Standards; assesses adequacy annually via a ten-year forcast and winter and summer forecasts; monitors the bulk power systems; and educates, trains, and certifies industry personnel. North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid More Documents & Publications Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to

220

(DOE/EIS-0285/SA-46): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Broader source: Energy.gov (indexed) [DOE]

6) 6) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Franklin County noxious weed management along BPA rights-of-ways, transmission structures, roads, and switches listed in Attachment 1. Attachment 1 identifies the ROW, ROW width, and ROW length of the proposed action. Includes all BPA 115kV, 230kV, and 500 kV ROWs in Franklin County, Washington. Location: The ROWs are all located in Franklin County, Washington in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear noxious and/or unwanted low-growing vegetation in all BPA ROWs in Franklin County, Washington. In a cooperative effort, BPA, through landowners and the Franklin County Weed Control Board, plan to eradicate noxious plants and other

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

(DOE/EIS-0285/SA-45): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Broader source: Energy.gov (indexed) [DOE]

5) 5) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Benton County noxious weed management along BPA rights-of-ways, transmission structures, roads, and switches listed in Attachment 1. Attachment 1 identifies the ROW, ROW width, and ROW length of the proposed action. Includes all BPA 115kV, 230kV, 345kV and 500 kV ROWs in Benton County, Washington. Location: The ROWs are all located in Benton County, Washington, Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear noxious and/or unwanted low-growing vegetation in all BPA ROWs in Benton County, Washington. In a cooperative effort, BPA, through landowners and the Benton County Weed Control Board, plan to eradicate noxious plants and other

222

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

2006. Transmission and Wind Energy: Capturing the Prevailingand Renewable Energy (Wind & Hydropower Technologiesand Renewable Energy Wind & Hydropower Technologies Program

Mills, Andrew D.

2009-01-01T23:59:59.000Z

223

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA - 128 - Olympia-Satsop #3 [Mile1-6]  

Broader source: Energy.gov (indexed) [DOE]

6, 2003 6, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 128 - Olympia-Satsop #3 [Mile 1-6] James Jellison Natural Resource Specialist - TFO/Olympia Proposed Action: Vegetation Management for the Olympia-Satsop #3 230 kV transmission line corridor (reference line) from structure 1/1 through structure 6/1 and between structures 8/3 and 8/4. Other lines which are present in the proposed corridor are the Paul-Satsop #1 500 kV, Olympia-Satsop #2 500 kV, Olympia-South Elma #1 115 kV, Olympia-Kitsap #3 230 kV, Olympia-Shelton #3 230 kV, Olympia-Shelton #4 230 kV, and Olympia-Shelton #1 115 kV. Right of way width averages 615 feet. Location: The project location is within Thurston County, Washington and is within the

224

(DOE/EIS-0285-SA-117): Supplement Analysis for the Transmission System Vegetation Management Program FEIS - (Ross Complex) 1/16/03  

Broader source: Energy.gov (indexed) [DOE]

16, 2003 16, 2003 REPLY TO ATTN OF: KEP/CSB-2 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-117- (Ross Complex) Paul Martin TFHV/CSB2 Proposed Action: Vegetation Management for the non-electric portions of the Bonneville Power Administration's Ross Complex Location: The Ross Complex is located at 5411 NE Highway 99, Vancouver, Clark County, Washington in the BPA Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage and maintain grounds and landscaping in the non-electrical portions of the Ross Facility. Vegetation management at the Facility shall include: 1) bare ground management of graveled storage areas, perimeter roads and parking

225

DOE/EIS-0285/SA-101: Supplement Analysis for the Transmission System Vegetation Management Program FEIS Spokane Region (9/13/02)  

Broader source: Energy.gov (indexed) [DOE]

13, 13, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-101) Spokane Region Michael F. Brock - TFS/BELL-1 Regional Manager, Spokane Region Proposed Action: Vegetation Management for Substations and Non-Electric Facilities (See Attachment A for a complete list of facilities) Location: Spokane Region. (See Attachment A) Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all graveled areas. These areas shall primarily be maintained with the use of herbicides. The management of vegetation outside the substation and associated facilities shall include: 1) bare

226

(DOE/EIS-0285/SA-27): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/28/02  

Broader source: Energy.gov (indexed) [DOE]

June 28, 2002 June 28, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-27) Ron Morinaka, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Abbot Creek Fish Barrier Project (Hungry Horse Mitigation / Habitat Improvements) Project No: 1991-19-03 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 8.2 Control of Predators and Nuisance Animals Location: Kalispell, Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) and Montana Fish, Wildlife & Parks Description of the Proposed Action: BPA proposes to fund a fishery enhancement project where a fish passage barrier will be installed in Abbot Creek to remove introduced rainbow trout

227

EIS-0317: Kangley-Echo Lake Transmission Line Project  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

228

High voltage overhead long transmission line design and fault analysis.  

E-Print Network [OSTI]

??The goal of this project is to design a reliable high voltage overhead long transmission line that satisfies specific design criteria including voltage regulation, efficiency, (more)

Elzain, Mohamed Ali

2011-01-01T23:59:59.000Z

229

Department of Energy Finalizes Loan Guarantee for New Transmission...  

Office of Environmental Management (EM)

Nevada, improving grid reliability and efficiency. "As our country increases its use of alternative energy sources, new transmissions lines like the ON Line project will play a...

230

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

231

National Electric Transmission Congestion Studies | Department...  

Energy Savers [EERE]

of the line or by operational directives that are created and enforced to protect the security and reliability of the grid. The term "transmission constraint" can refer to a...

232

Software reliability models for critical applications  

SciTech Connect (OSTI)

This report presents the results of the first phase of the ongoing EG&G Idaho, Inc. Software Reliability Research Program. The program is studying the existing software reliability models and proposes a state-of-the-art software reliability model that is relevant to the nuclear reactor control environment. This report consists of three parts: (1) summaries of the literature review of existing software reliability and fault tolerant software reliability models and their related issues, (2) proposed technique for software reliability enhancement, and (3) general discussion and future research. The development of this proposed state-of-the-art software reliability model will be performed in the second place. 407 refs., 4 figs., 2 tabs.

Pham, H.; Pham, M.

1991-12-01T23:59:59.000Z

233

Software reliability models for critical applications  

SciTech Connect (OSTI)

This report presents the results of the first phase of the ongoing EG G Idaho, Inc. Software Reliability Research Program. The program is studying the existing software reliability models and proposes a state-of-the-art software reliability model that is relevant to the nuclear reactor control environment. This report consists of three parts: (1) summaries of the literature review of existing software reliability and fault tolerant software reliability models and their related issues, (2) proposed technique for software reliability enhancement, and (3) general discussion and future research. The development of this proposed state-of-the-art software reliability model will be performed in the second place. 407 refs., 4 figs., 2 tabs.

Pham, H.; Pham, M.

1991-12-01T23:59:59.000Z

234

SunZia Southwest Transmission Project Comments  

Broader source: Energy.gov (indexed) [DOE]

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

235

Transmission Developers Inc.  

Broader source: Energy.gov (indexed) [DOE]

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

236

DOE EAC Electricity Adequacy Report. Transmission Section - September 15,  

Broader source: Energy.gov (indexed) [DOE]

Transmission Section - Transmission Section - September 15, 2008 DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 There is a critical need to upgrade the nation's electric transmission grid. Two reasons in particular drive this need. First, increasing transmission capability will help ensure a reliable electric supply and provide greater access to economically-priced power. Second, with the growth in state-adopted renewable performance standards (RPS) and the increasing possibility of a national RPS, significant new transmission, much of it interregional, is needed to access renewable resources. DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 More Documents & Publications DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT-

237

Transmission Bottleneck Project Report. March 19, 2003 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 The U.S. Department of Energy (DOE) National Transmission Grid Study (DOE 2002) determined that congestion in the U.S. electricity transmission system places daily constraints on electricity trade, increasing both electricity costs to consumers and impacts reliable operations. In an effort to support DOE's investigation of transmission bottlenecks, the Consortium for Electric Reliability Technology Solutions (CERTS) surveyed the current state of transmission congestion around the nation. Transmission Bottleneck Project Report. March 19, 2003 More Documents & Publications Electricity Transmission Congestion Costs: A Review of Recent Reports 2012 National Electric Transmission Congestion Study: Preliminary Findings

238

Definition: Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Service Service Jump to: navigation, search Dictionary.png Transmission Service Services provided to the Transmission Customer by the Transmission Service Provider to move energy from a Point of Receipt to a Point of Delivery.[1] Related Terms transmission lines, Transmission Customer, Transmission Service Provider, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Service&oldid=480302" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

239

Transmission Congestion Study COMMENTS OF CONSOLIDATED EDISION...  

Broader source: Energy.gov (indexed) [DOE]

and improving reliability through the use of aggressive energy efficiency and demand response programs, and has added new generation since 2006." And, at the Workshop,...

240

(DOE/EIS-0285/SA-112): Supplement Analysis for the Transmission System Vegetation Management Program FEIS -Ross-Alcoa 1&2, 3&4 and Bonneville-Alcoa 1&2) 10/15/02  

Broader source: Energy.gov (indexed) [DOE]

October October 15, 2002 REPLY TO ATTN OF: KEP/Z-992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-112-Ross-Alcoa 1&2, 3&4 and Bonneville Alcoa 1&2. Ed Tompkins - TFO/Ross Proposed Action: Vegetation Management for portions of the Ross-Alcoa transmission lines 230kV & 115kV and Bonneville-Alcoa 115kV. Proposed by: Bonneville Power Administration (BPA). Location: Project location is within Clark County, Washington and is within the Olympia Region. Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of-Ways along access roads and around tower structures that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: See the attached checklists

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 106 SnoKing Tap to Monroe-Samamish Line 9/30/02  

Broader source: Energy.gov (indexed) [DOE]

30, 30, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 106 SnoKing Tap to Monroe-Samamish Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the SnoKing Tap to the Monroe-Samamish transmission line from structure 8/1 through structure 20/6. Right of way width is 150 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 12 miles of access roads

242

Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

243

Wind Integration, Transmission, and Resource Assessment and Characterization Projects  

Broader source: Energy.gov [DOE]

This report covers the Wind and Water Power Programs Wind Integration, Transmission, and Resource Assessment and Characterization Projects from FY 2006 to FY 2014.

244

Reliability-Centered Maintenance  

Broader source: Energy.gov [DOE]

Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

245

North American Electric Reliability Corporation (NERC): Reliability...  

Broader source: Energy.gov (indexed) [DOE]

and winter and summer forecasts; monitors the bulk power systems; and educates, trains, and certifies industry personnel. North American Electric Reliability Corporation...

246

Office of Electricity Delivery And Energy Reliability To Hold Technical  

Broader source: Energy.gov (indexed) [DOE]

Office of Electricity Delivery And Energy Reliability To Hold Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission February 5, 2009 - 10:57am Addthis On March 4, 2009, the Department of Energy's Office of Electricity Delivery and Energy Reliability (OE) will conduct a technical conference in the Washington, DC area to discuss the design of future electric transmission. The technical conference will discuss the likely demand for future electric transmission and whether the development of conceptual alternative extra high voltage (EHV) systems would assist generation developers, State energy policy officials, utility planners, and other

247

A case study review of technical and technology issues for transition of a utility load management program to provide system reliability resources in restructured electricity markets  

E-Print Network [OSTI]

Issues for Transition of a Utility Load Management ProgramSCEs load management system is to transition from providinga transition from SCEs current load management system to an

Weller, G.H.

2001-01-01T23:59:59.000Z

248

Definition: Transmission Planner | Open Energy Information  

Open Energy Info (EERE)

Planner Planner Jump to: navigation, search Dictionary.png Transmission Planner The entity that develops a long-term (generally one year and beyond) plan for the reliability (adequacy) of the interconnected bulk electric transmission systems within its portion of the Planning Authority Area.[1] Related Terms transmission lines, transmission line, planning authority, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Planner&oldid=502606" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

249

Regional Transmission Projects: Finding Solutions  

SciTech Connect (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

250

Final Report Navajo Transmission Project (NTP)  

SciTech Connect (OSTI)

The Din Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

Bennie Hoisington; Steven Begay

2006-09-14T23:59:59.000Z

251

DOE/EIS-0285-SA-137: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Chemawa-Salem 1&2 (4/1/03)  

Broader source: Energy.gov (indexed) [DOE]

7- Chemawa-Salem1&2) 7- Chemawa-Salem1&2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Chemawa-Salem #1 115 kV and #2 230 kV transmission lines from Chemawa Substation to Salem Substation. Location: The project is located in the BPA Eugene Region, Marion County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-

252

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2  

Broader source: Energy.gov (indexed) [DOE]

2- KeelerOregon City #2) 2- KeelerOregon City #2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Keeler-Oregon City #2 115 kV transmission line from Keeler Substation to Oregon City Substation. Includes 5 miles of the St. Johns- Oregon City #2 69 kV transmission line. Location: The project is located in the BPA Eugene Region, Washington County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation via hand cutting along the right-of-way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with

253

Transmission Investment: A Primer  

SciTech Connect (OSTI)

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

254

Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at...

255

Electrochemical noise sensors for detection of localized and general corrosion of natural gas transmission pipelines  

SciTech Connect (OSTI)

The U.S. Department of Energy, National Energy Technology Laboratory funded a Natural Gas Infrastructure Reliability program directed at increasing and enhancing research and development activities in topics such as remote leak detection, pipe inspection, and repair technologies and materials. The Albany Research Center (ARC), U.S. Department of Energy was funded to study the use of electrochemical noise sensors for detection of localized and general corrosion of natural gas transmission pipelines. As part of this, ARC entered into a collaborative effort with the corrosion sensor industry to demonstrate the capabilities of commercially available remote corrosion sensors for use with the Nation's Gas Transmission Pipeline Infrastructure needs. The goal of the research was to develop an emerging corrosion sensor technology into a monitor for the type and degree of corrosion occurring at key locations in gas transmission pipelines.

Holcomb, Gordon R.; Bullard, Sophie J.; Covino, Bernard S., Jr.; Cramer, Stephen D.; Russell, James H.; Ziomek-Moroz, Margaret

2002-09-01T23:59:59.000Z

256

Recovery Act Interconnection Transmission Planning  

Broader source: Energy.gov [DOE]

Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

257

Power electronics reliability analysis.  

SciTech Connect (OSTI)

This report provides the DOE and industry with a general process for analyzing power electronics reliability. The analysis can help with understanding the main causes of failures, downtime, and cost and how to reduce them. One approach is to collect field maintenance data and use it directly to calculate reliability metrics related to each cause. Another approach is to model the functional structure of the equipment using a fault tree to derive system reliability from component reliability. Analysis of a fictitious device demonstrates the latter process. Optimization can use the resulting baseline model to decide how to improve reliability and/or lower costs. It is recommended that both electric utilities and equipment manufacturers make provisions to collect and share data in order to lay the groundwork for improving reliability into the future. Reliability analysis helps guide reliability improvements in hardware and software technology including condition monitoring and prognostics and health management.

Smith, Mark A.; Atcitty, Stanley

2009-12-01T23:59:59.000Z

258

NREL: Gearbox Reliability Collaborative - Gearbox Reliability Collaborative  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

All Members Meeting All Members Meeting The Gearbox Reliability Collaborative (GRC) All Members Meeting was held on February 4-5, 2013. The meeting covered advancements made across the NREL GRC project and the latest industry updates on gearbox reliability and operations and maintenance practices. The presentations covered gearbox design updates, gearbox testing updates, experimental data analysis, and operations and maintenance research. Presentations Monday, February 4 Time Presenter Organization Presentation 8:30 a.m. Paul Veers NREL Welcome 8:45 a.m. Mike Derby DOE Overview 9:05 a.m. Jon Keller NREL Gearbox Reliability Collaborative Status and Plans 9:20 a.m. Hal Link NREL New Gearbox #2 Test Plan 9:40 a.m. Hal Link NREL NWTC Dynos and Grid Simulator 10:00 a.m. Jon Keller/Brian McNiff NREL/MLI Gearbox Reliability Collaborative, Phase 3: High Speed Shaft Bearing Loads

259

DOE Transmission System Integration Workshop  

Broader source: Energy.gov (indexed) [DOE]

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

260

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

DOE/EIS-0285-SA-139: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Little Goose-Lower Granite Corridor Maintenance (4/3/03)  

Broader source: Energy.gov (indexed) [DOE]

9-Little Goose-Lower Granite Corridor Maintenance 9-Little Goose-Lower Granite Corridor Maintenance William Erickson Natural Resource Specialist - TFP/Walla Walla Proposed Action: Vegetation Management for the Little Goose-Lower Granite #1 and #2 Transmission Line Corridor from Towers 4/3 to 8/1. The right-of-way has an easement width of 258 feet and contains two 500kV Single Circuit Transmission Lines. The proposed work will be accomplished in the indicated sections of the transmission line corridor as referenced in the attached checklist. Location: The subject right-of-way is located in Columbia County, WA., being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: The work will be accomplished by an Integrated Vegetation Management approach using a combination of manual, mechanical, herbicides and biological

262

Supplement Analysis for the Transmission System Vegetation Management Program FEIT (DOE/EIS-0285/SA-95) Chehalis-Olympia No. 1 and Chehalis-Centralia No. 2  

Broader source: Energy.gov (indexed) [DOE]

5) 5) Chehalis-Olympia No.l and Chehalis-Centralia No. 2 James A. Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation management along the Chehalis-Olympia No. 1 and Chehalis-Centralia No. 2, 230kV transmission line. The project area is located within Lewis and Thurston Counties, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 29 miles of access roads and corridor will be treated. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line. See

263

DOE/EIS-0285-SA-136: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Oregon City-Chemawal 1&2 (4/1/03)  

Broader source: Energy.gov (indexed) [DOE]

6- Oregon City-Chemawa1&2) 6- Oregon City-Chemawa1&2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Oregon City-Chemawa #1 and #2 115 kV transmission lines from Oregon City Substation to Chemawa Substation. Location: The project is located in the BPA Eugene Region, Washington and Marion Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that

264

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-111) - (Fairview-Brandon #1, Fairview-Brandon #2 and Fairview-Rogue #1access road, danger tree and structure clearing) 9/25/02  

Broader source: Energy.gov (indexed) [DOE]

25, 25, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-111) - (Fairview-Bandon #1, Fairview-Bandon #2 and Fairview-Rogue #1access road, danger tree and structure clearing) Benjamin Tilley Natural Resource Specialist Proposed Action: Vegetation Management for the Fairview-Bandon #1and #2 and Fairview- Rogue #1 transmission lines. Location: Throughout the Fairview-Bandon #1, Fairview-Bandon #2 and Fairview-Rogue #1 corridors located within Coos and Curry counties in Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: Tall-growing vegetation that is currently or will soon be a hazard to the line will be removed. Vegetation that will grow tall will be selectively eliminated before it reaches a height or density to begin competing with low-growing

265

(DOE/EIS-0285/SA-109): Supplement Analysis for the Transmission System Vegetation Management Program FEIS - (Santiam-Alvey # 1 #2 access road and structure clearing) 9/9/02  

Broader source: Energy.gov (indexed) [DOE]

9, 9, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-109) - (Santiam-Alvey # 1 and #2 access road and structure clearing) Benjamin Tilley Natural Resource Specialist Proposed Action: Vegetation Management for the Santiam-Alvey # 1 and #2 transmission line. Location: Throughout the Santiam-Alvey # 1 and #2 corridor located within Linn and Lane counties in Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: Tall-growing vegetation that is currently or will soon be a hazard to the line will be removed. Vegetation that will grow tall will be selectively eliminated before it reaches a height or density to begin competing with low-growing species. Cut-stump or follow- up herbicide treatments on re-sprouting-type species will be carried out to ensure

266

(DOE/EIS-0285-SA-104): Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Lynch Creek Tap to LaGrande-Cowlitz No.1 8/21/02  

Broader source: Energy.gov (indexed) [DOE]

1, 1, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-104-Lynch Creek Tap to LaGrande-Cowlitz No. 1 James A. Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management for the Lynch Creek to LaGrande-Cowlitz No. 1 Location: Near the town of Eatonville, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 29 miles of access roads and corridor will be treated. Vegetation management is required

267

Optoelectronics 514 Transmission Hologram Transmission Hologram  

E-Print Network [OSTI]

Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

Collins, Gary S.

268

NREL: Performance and Reliability R&D - PV Module Reliability...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reliability R and D Printable Version PV Module Reliability Workshop NREL hosts an annual Photovoltaic Module Reliability Workshop (PVMRW) so that solar technology experts can...

269

Reports on the Impact of the Smart Grid Investment Grant Program Now  

Broader source: Energy.gov (indexed) [DOE]

Reports on the Impact of the Smart Grid Investment Grant Program Reports on the Impact of the Smart Grid Investment Grant Program Now Available Reports on the Impact of the Smart Grid Investment Grant Program Now Available January 29, 2013 - 3:03pm Addthis The Department of Energy's Office of Electricity Delivery and Energy Reliability has released four reports on the impact of the Recovery Act-funded Smart Grid Investment Grant (SGIG) Program. Under the SGIG Program, investor-owned and municipal utilities, transmission operators, and electric co-ops across the U.S. are deploying a range of smart technologies and systems designed to increase the electric grid's flexibility, reliability, efficiency, affordability, and resilience. The new reports cover four key smart grid application areas: Reliability improvements from the application of distribution

270

Reports on the Impact of the Smart Grid Investment Grant Program Now  

Broader source: Energy.gov (indexed) [DOE]

Reports on the Impact of the Smart Grid Investment Grant Program Reports on the Impact of the Smart Grid Investment Grant Program Now Available Reports on the Impact of the Smart Grid Investment Grant Program Now Available January 29, 2013 - 3:03pm Addthis The Department of Energy's Office of Electricity Delivery and Energy Reliability has released four reports on the impact of the Recovery Act-funded Smart Grid Investment Grant (SGIG) Program. Under the SGIG Program, investor-owned and municipal utilities, transmission operators, and electric co-ops across the U.S. are deploying a range of smart technologies and systems designed to increase the electric grid's flexibility, reliability, efficiency, affordability, and resilience. The new reports cover four key smart grid application areas: Reliability improvements from the application of distribution

271

Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |  

Broader source: Energy.gov (indexed) [DOE]

Technology Development » Transmission Planning » Technology Development » Transmission Planning » Recovery Act Interconnection Transmission Planning » Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to access each awardee's meeting and events calendar. Eastern Interconnection Topic A Awardee: Eastern Interconnection Planning Collaborative Topic B Awardee: Eastern Interconnection States' Planning Council Western Interconnection Topic A Awardee: Western Electricity Coordinating Council Topic B Awardee: Western Governors' Association Texas Interconnection Topic A and B Awardee: Electric Reliability Council of Texas Electricity Advisory Committee Technology Development Transmission Planning

272

Technique for Measuring Hybrid Electronic Component Reliability  

SciTech Connect (OSTI)

Materials compatibility studies of aged, engineered materials and hardware are critical to understanding and predicting component reliability, particularly for systems with extended stockpile life requirements. Nondestructive testing capabilities for component reliability would significantly enhance lifetime predictions. For example, if the detection of crack propagation through a solder joint can be demonstrated, this technique could be used to develop baseline information to statistically determine solder joint lifelengths. This report will investigate high frequency signal response techniques for nondestructively evaluating the electrical behavior of thick film hybrid transmission lines.

Green, C.C.; Hernandez, C.L.; Hosking, F.M.; Robinson, D.; Rutherford, B.; Uribe, F.

1999-01-01T23:59:59.000Z

273

Transmission | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

274

Improving Reliability and Durability of Efficient and Clean Energy Systems - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10 10 DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report Prabhakar Singh Center for Clean Energy Engineering University of Connecticut (UConn) 44 Weaver Road, Unit 5233 Storrs, CT 06268-5233 Phone: (860) 486-8379 Email: singh@engr.uconn.edu DOE Managers HQ: Dimitrios Papageorgopoulos Phone: (202) 586-5463 Email: Dimitrios.Papageorgopoulos@ee.doe.gov GO: Reginald Tyler Phone: (720) 356-1805 Email: Reginald.Tyler@go.doe.gov Technical Advisor Thomas Benjamin Phone: (720) 356-1805 Email: benjamin@anl.gov Contract Number: DE-EE00003226 Project Start Date: August 1, 2010 Project End Date: July 31, 2013 *Congressionally directed project Fiscal Year (FY) 2012 Objectives Develop an understanding of the degradation processes * in advanced electrochemical energy conversion systems.

275

Superconductivity Program Overview High-Temperature Superconductivity  

Broader source: Energy.gov (indexed) [DOE]

SuperconducTiviTy program haS Three FocuS areaS: SuperconducTiviTy program haS Three FocuS areaS: SuperconducTiviTy applicaTionS Developing HTS-based electric power equipment such as transmission and distribution cables and fault current limiters Second-generaTion Wire developmenT Developing high-performance, low-cost, second- generation HTS wire at long lengths STraTegic reSearch Supporting fundamental research activities to better understand relationships between the microstructure of HTS materials and their ability to carry large electric currents over long lengths Superconductivity Program Overview High-Temperature Superconductivity for Electric Systems Office of Electricity Delivery and Energy Reliability www.oe.energy.gov Office of Electricity Delivery and Energy Reliability, OE-1 U.S. Department of Energy - 1000 Independence Avenue, SW - Washington, DC 20585

276

Design and fault analysis of a 345KV 220 mile overhead transmission line.  

E-Print Network [OSTI]

??Efficient and reliable transmission of bulk power economically benefits both the power company and consumer. This report gives clarification to concept and procedure in design (more)

Clawson, Greg

2012-01-01T23:59:59.000Z

277

Joint transmission system projects to improve system reliability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 12 JOINT NEWS RELEASE Bonneville Power Administration Puget Sound Energy Seattle City Light Snohomish PUD FOR IMMEDIATE RELEASE Tuesday, January 24, 2012 CONTACT: Mike Hansen,...

278

Reliability modeling of transmission and distribution systems including dependent failures  

E-Print Network [OSTI]

is considered. Therefore, the trans i t ion rate mat r i x of the entire system need not be generated. Th i s method is compared wi th the sequential method for normal and stormy weather condit ions, and is then extended to include m weather conditions... . 9 E . Cut -Set Equations 10 III M A R K O V C U T - S E T M E T H O D 13 A . Basic Approach 13 B . Markov Cut -Set Me thod 13 C . Examp le 18 D . Compar ison wi th the Sequential Me thod 22 E . Cut-Sets w i th m Weather States 24 F . Extens...

Beydoun, Rami Sami

2012-06-07T23:59:59.000Z

279

Influenza Immunization Program - HPMC Occupational Health Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Analysis Human Reliability Program (HRP) Industrial Rehabilitation & Ergonomics Infection Control & Immunizations Influenza Immunization Program Medical Exam Scheduling Medical...

280

2013 Reliability & Markets Peer Review - Day 1 Presentations | Department  

Broader source: Energy.gov (indexed) [DOE]

2013 Reliability & Markets Peer Review - Day 1 Presentations 2013 Reliability & Markets Peer Review - Day 1 Presentations 2013 Reliability & Markets Peer Review - Day 1 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 6 - 7, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Ben Hobbs (Johns Hopkins), Kameshwar Poolla (UC Berkeley) Session II: Ray Zimmerman (Cornell), Hsiao-Dong Chiang (Cornell) Session III: Shmuel Oren (UC Berkeley), Dan Tylavsky (U Arizona), Tom Overbye (U Illinois) Session IV: Lindsay Anderson (Cornell), HyungSeon Oh (Cornell) 2013 R&M Peer Review - Assessing Transmission Investments Under Uncertainty - Ben Hobbs, Johns Hopkins 2013 R&M Peer Review - Coordinated Aggregation of Distributed Energy

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

2012 Reliability & Markets Peer Review - Full Presentations | Department of  

Broader source: Energy.gov (indexed) [DOE]

Reliability & Markets Peer Review - Full Presentations Reliability & Markets Peer Review - Full Presentations 2012 Reliability & Markets Peer Review - Full Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 11 presentations over 2 days on August 7 - 8, 2012 at Cornell University in Ithaca, NY. The full presentations are available below. Presentation summaries are also available. 2012 R&M Peer Review - Transmission Investment Assessment Under Uncertainty - Ben Hobbs 2012 R&M Peer Review - Renewable Integration Through Risk-Limiting Dispatch - Pravin Varaiya 2012 R&M Peer Review - Development and Testing of New Tools - Ray Zimmerman 2012 R&M Peer Review - Commercialization of the SuperOPF Framework - Hsiao-Dong Chiang 2012 R&M Peer Review - Essence of Structure Preserving Network Reductions -

282

2012 Reliability & Markets Peer Review | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reliability & Markets Peer Review Reliability & Markets Peer Review 2012 Reliability & Markets Peer Review The Transmission Reliability R&D Reliability & Markets Peer Review included 11 presentations over 2 days on August 7 - 8, 2012 at Cornell University in Ithaca, NY. Presentations and summaries are available through the links and the agenda is included below. Summaries | Full Presentations Day 1: August 7 Transmission Investment Assessment Under Uncertainty About Fuel Prices, Technology, Renewables Penetration and Market Responses Using a Multi-State Stochastic Model Approach with Recourse Renewable Integration Through Risk-Limiting Dispatch and Distributed Resource Aggregations Development and Testing of New Tools Commercialization of the SuperOPF Framework: Phase 2 Essence of Structure Preserving (ESP) Network Reductions for

283

Internal Program Review  

Broader source: Energy.gov (indexed) [DOE]

Synchrophasor Initiative (NASPI) and Synchrophasor Initiative (NASPI) and Advanced Applications Research & Development (AARD) Internal Program Review 27-28 June 2013 Washington, DC Joe Eto Lawrence Berkeley National Lab DOE/OE Transmission Reliability Program 2 Management Review Topics  Project objective  Major technical accomplishments that will be completed this year  Deliverables and schedule for activities to be completed under FY13 funding  Risk factors affecting timely completion of planned activities as well as movement through RD&D cycle  Early thoughts on follow-on work that should be considered for funding in FY14 3 Management Review Issues  RD&D stage of the project: - Theoretical study-proof of concept - Modeling/simulation-using real data?

284

CERTS 2012 Program Review - NASPI Leadership and Task Team Technical Support - Joe Gracia, ORNL  

Broader source: Energy.gov (indexed) [DOE]

ORNL's Support of NASPI ORNL's Support of NASPI Presented at: DOE OE Transmission Reliability Program Review ORNL Team: Jose R. Gracia, P.E. (Presenter) D. Tom Rizy Isabelle Snyder, Ph.D. 12 June 2012 2 Managed by UT-Battelle for the U.S. Department of Energy OE Transmission Reliability Program Review NASPI Goal: To improve the reliable operation of the North American power system by successfully transitioning synchrophasor technologies from research to industry adoption. 2 Project Objective(s) ORNL's activities in support of NASPI include: * Participate in NASPI Leadership Team * Support Operations Implementation Task Team * Participate in Performance and Standards Task Team * Develop needed metrology capabilities in partnership with NIST.

285

Reliability of Electrical Interconnects  

Broader source: Energy.gov [DOE]

2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

286

Reliability of Bonded Interfaces  

Broader source: Energy.gov [DOE]

2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

287

Thermoelectric Mechanical Reliability  

Broader source: Energy.gov [DOE]

2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation

288

(DOE/EIS-0285/SA 107): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Elma-Cosmopolis #1 9/5/02  

Broader source: Energy.gov (indexed) [DOE]

7, 7, Elma-Cosmopolis #1. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elma-Cosmopolis #1 115kV transmission line corridor from structure 11/7 through structure 20/3. Right of way width averages 100 feet. Location: The project area is located in Grays Harbor County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridors. Approximately 8 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 2.8 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites

289

DOE/EIS-0285-SA-138: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (Raver-Echo Lake #1) (4/3/03)  

Broader source: Energy.gov (indexed) [DOE]

8 (Raver-Echo Lake #1 8 (Raver-Echo Lake #1 Don Atkinson Natural Resource Specialist - TFN/SNOHOMISH Proposed Action: Vegetation Management for portion of the Raver - Echo Lake #1 500 kV transmission line located from tower structure 4/1 to 13/1. Location: Project location is within King County, Washington and is within the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the right-of- way. BPA proposes to clear along access roads and remove danger trees outside the right-of-way where appropriate. Project is to remove vegetation that may impede the operation and maintenance of the subject transmission line. See Section 1.1 through 1.4 of the attached checklists for a complete description of the proposed action.

290

(DOE/EIS-0285/SA 108): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Satsop-Aberdeen #2 9/5/02  

Broader source: Energy.gov (indexed) [DOE]

8, 8, Satsop-Aberdeen #2. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Satsop-Aberdeen #2 230kV transmission line corridor from structure 1/1 through structure 11/5 (reference line). Other lines which are present in the proposed corridor are the Satsop-Aberdeen #3 230 kV, South Elma-Cosmopolis 115kV, and Aberdeen tap to South Elma-Cosmospolis 115kV. Right of way width averages 238 feet. Location: The project area is located in Grays Harbor County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 11 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide

291

Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.  

SciTech Connect (OSTI)

This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.

Eyer, James M. (Distributed Utility Associates, Livermore, CA); Butler, Paul Charles; Iannucci, Joseph J., Jr. (,.Distributed Utility Associates, Livermore, CA)

2005-11-01T23:59:59.000Z

292

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

293

2012 Load as a Resource Program Peer Review | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Load as a Resource Program Peer Review Load as a Resource Program Peer Review 2012 Load as a Resource Program Peer Review The Transmission Reliability R&D Load as a Resource (LAAR) Program peer review included 8 presentations on September 20, 2012 at Lawrence Berkeley National Lab. Agenda and presentations are below. 2012 LAAR Program Peer Review - Agenda 2012 LAAR Program Peer Review - Frequency Response Demand - Jeff Dagle, PNNL 2012 LAAR Program Peer Review - Frequency Responsive Load Evaluation and Benefits - Isabelle Snyder, ORNL 2012 LAAR Program Peer Review - Load as a Regulation Resource, Phase 2 - Sila Kiliccote, LBNL 2012 LAAR Program Peer Review - Scoping Study on Industrial Regulation - Nasr Alkadi, ORNL 2012 LAAR Program Peer Review - Integration and Extension of Direct Load Management of Smart Loads - Anna Scaglioni, UC Davis

294

Transmission Infrastructure: FERCs Role  

U.S. Energy Information Administration (EIA) Indexed Site

Transmission Incentives Transmission Incentives Transmission Incentives P. Kumar Agarwal P. Kumar Agarwal Acting Director, Division of Reliability & Acting Director, Division of Reliability & Engineering Services Engineering Services Federal Energy Regulatory Commission Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration U.S. DOE, Energy Information Administration 2009 Energy Conference 2009 Energy Conference Washington, DC Washington, DC April 7, 2009 April 7, 2009 2 2 History History   Energy Policy Act of 2005, August 5, Energy Policy Act of 2005, August 5, 2005 2005 - - Created FPA Section 219 Created FPA Section 219   FERC issued order No. 679 on July 20, FERC issued order No. 679 on July 20, 2006 adopting regulations to promote 2006 adopting regulations to promote

295

DOE Electricity Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

296

Transmission Investment Timing and Sizing under Uncertainty Afzal Siddiqui  

E-Print Network [OSTI]

of a private investor holding a perpetual option to construct a transmission line. Using the real options-reverting process 1 Introduction Given the dependence of modern society on electricity, increased reliability than cost reduction. In deregulated electricity industries with functioning markets, transmission

Guillas, Serge

297

10 Year Transmission Plan for the Western Electricity Interconnection  

Broader source: Energy.gov (indexed) [DOE]

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

298

Reliability Standards Owner  

Broader source: Energy.gov [DOE]

This position is located in the Internal Operations and Asset Management group of Planning and Asset Management (TP). A successful candidate in this position will serve as the Reliability Standards...

299

NREL: Gearbox Reliability Collaborative - Gearbox Reliability Collaborative  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Projects Gearbox deficiencies are the result of many factors. Through gearbox modeling and testing, condition monitoring, and the failure database, the collaborative is expanding the industry's knowledge base, recommending efficient and cost-effective improvements, and facilitating immediate improvements in the gearbox life cycle. Gearbox Modeling and Testing Illustration of representative gearbox including the hub, main bearing, main shaft, gearbox, brake, high speed shaft, generator, and bed plate. A complete gearbox redesign has been completed in a collaborative effort between NREL and industry partners. This process documented and analyzed the design process and produced a new gearbox design that integrates knowledge from previous Gearbox Reliability Collaborative (GRC) activities.

300

(DOE/EIS-0285-SA-87): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Cowlitz Tap-Olympia White River 7/23/02  

Broader source: Energy.gov (indexed) [DOE]

0, 2002 0, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-87) Mark Shaw TO: Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Protect and Restore the Asotin Creek Watershed - Upper Charley Subwatershed Ecosystems Restoration Projects (road obliteration) Project No: 2002-054-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 7.18 Road Closure Location: Charley Creek Subwatershed, Umatilla National Forest, Idaho Proposed by: Bonneville Power Administration (BPA) and the Nez Perce Tribal Fisheries/Watershed Program Description of the Proposed Action: BPA is proposing to fund a project that will address

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Programming  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

provided on the Cray systems at NERSC. The Programming Environment is managed by a meta-module named similar to "PrgEnv-gnu4.6". The "gnu" indicates that it is providing the GNU...

302

General Order Ensuring Reliable Electric Service (Louisiana) | Department  

Broader source: Energy.gov (indexed) [DOE]

General Order Ensuring Reliable Electric Service (Louisiana) General Order Ensuring Reliable Electric Service (Louisiana) General Order Ensuring Reliable Electric Service (Louisiana) < Back Eligibility Investor-Owned Utility Municipal/Public Utility Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Louisiana Program Type Safety and Operational Guidelines Provider Louisiana Public Service Commission The standards set forth herein have been developed to provide consumers, the Louisiana Public Service Commission, and jurisdictional electric utilities with a uniform method of ensuring reliable electric service. The standards shall be applicable to the distribution systems of all electric utilities under the jurisdiction of the Louisiana Public Service

303

Sandia National Laboratories: Inverter Reliability Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Engine Test Facility Central Receiver Test Facility Power Towers for Utilities Solar Furnace Dish Test Facility Optics Lab Parabolic Dishes Work For Others (WFO) User...

304

2010 Resource Program Executive Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

increase transmission flexibility * Directly involve electricity users through demand response programs BPA is actively pursuing all these areas. The Resource Program analysis...

305

Rural Utilities Service Electric Program  

Broader source: Energy.gov [DOE]

The Rural Utilities Service Electric Programs loans and loan guarantees finance the construction of electric distribution, transmission, and generation facilities, including system improvements...

306

Reliability centered maintenance for substation equipment  

SciTech Connect (OSTI)

This paper is a collection of training materials on the principles and implementation of reliability centered maintenance. The main areas discussed in this presentation are organized as follows: RCM principles and concepts; RCM tools, resources and methods; overview of the RCM process; example RCM application; living PM program; RCM implementation experience.

NONE

1996-08-01T23:59:59.000Z

307

Gearbox Reliability Collaborative Update (Presentation)  

SciTech Connect (OSTI)

This presentation was given at the Sandia Reliability Workshop in August 2013 and provides information on current statistics, a status update, next steps, and other reliability research and development activities related to the Gearbox Reliability Collaborative.

Sheng, S.

2013-10-01T23:59:59.000Z

308

Parametric probability distributions in reliability  

E-Print Network [OSTI]

Parametric probability distributions in reliability F.P.A. Coolen Department of Mathematical parametric probability distributions which are frequently used in reliability. We present some main as models for specific reliability scenarios. Keywords: Binomial distribution, Exponential distribution

Coolen, Frank

309

DOE/EIS-0285/SA-133: Supplement Analysis for the Transmission System Vegetation Management Program FEIS Hanford-Ostrander [Mile 126/1-146/4] (3/20/03)  

Broader source: Energy.gov (indexed) [DOE]

0, 2003 0, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-133 Hanford-Ostrander [Mile 126/1-146/4] Elizabeth Johnson Natural Resource Specialist- TFR/The Dalles Proposed Action: Vegetation Management for the Hanford-Ostrander Corridor from structure 126/1 through structure 146/4. Right of way width averages 312 feet. Location: The project location is within Skamania County, Washington. The project commences to the west of the White Salmon River and proceeds in a westerly directly for approximately 20 miles. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

310

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-147 (Big Eddy-Chenoweth NO. 1&2, Big Eddy - Midway & Chenoweth-Goldendale)  

Broader source: Energy.gov (indexed) [DOE]

1, 2003 1, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-147 (Big Eddy-Chenoweth NO. 1 &2, Big Eddy - Midway & Chenoweth- Goldendale) Elizabeth Johnson Natural Resource Specialist - TFR/The Dalles Proposed Action: Vegetation Management for the Big Eddy-Chenoweth NO. 1 &2 Substation to Substation, Big Eddy - Midway Substation to 2/3) & Chenoweth-Goldendale (Substation to 2/3). Location: Project location is within Wasco County, Oregon & Klickitat County, Washington and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the right-of-way.

311

Real-Time Grid Reliability Management PIER Final Project Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Real-Time Grid Reliability Management PIER Final Project Report Real-Time Grid Reliability Management PIER Final Project Report Title Real-Time Grid Reliability Management PIER Final Project Report Publication Type Report Year of Publication 2008 Authors Eto, Joseph H., Manu Parashar, Bernard C. Lesieutre, and Nancy J. Lewis Pagination 62 Date Published 12/2008 Publisher LBNL City Berkeley Keywords consortium for electric reliability technology solutions (certs), energy analysis and environmental impacts department Abstract The increased need to manage California's electricity grid in real time is a result of the ongoing transition from a system operated by vertically integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management - construction of new transmission lines - has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools.

312

Real Time Grid Reliability Management 2005  

SciTech Connect (OSTI)

The increased need to manage California?s electricity grid in real time is a result of the ongoing transition from a system operated by vertically-integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management -- construction of new transmission lines -- has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools. This project: (1) developed and conducted first-ever demonstrations of two prototype real-time software tools for voltage security assessment and phasor monitoring; and (2) prepared a scoping study on improving load and generator response models. Additional funding through two separate subsequent work authorizations has already been provided to build upon the work initiated in this project.

Eto, Joe; Eto, Joe; Lesieutre, Bernard; Lewis, Nancy Jo; Parashar, Manu

2008-07-07T23:59:59.000Z

313

NREL: Transmission Grid Integration - Glossary of Transmission...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contingency events are big (many megawatt) and fast (within a few cycles). Demand response Voluntary (and compen-sated) load reduction used as a bulk system reliability...

314

Congestion Management pilot program factsheet - June 2007  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to resolve congestion on its transmission system - reliability redispatch, interim (or bridge) and hourly ATC methodology. The fact sheet also announced that the agency would run a...

315

Natural Gas Transmission Pipeline Siting Act (Florida) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Natural Gas Transmission Pipeline Siting Act (Florida) Natural Gas Transmission Pipeline Siting Act (Florida) Natural Gas Transmission Pipeline Siting Act (Florida) < Back Eligibility Commercial Construction Developer Fed. Government Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection This Act establishes a centralized and coordinated permitting process for the location of natural gas transmission pipeline corridors and the construction and maintenance of natural gas transmission pipelines. The Act intends to achieve a reasonable balance between the need for the natural

316

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

317

Office of Electricity Delivery and Energy Reliability, OE-20  

Broader source: Energy.gov (indexed) [DOE]

January, 2012 January, 2012 Office of Electricity Delivery and Energy Reliability, OE-20 U.S. Department of Energy 1000 Independence Avenue SW Washington, DC 20585 Greetings: The Wyoming Infrastructure Authority (WIA) hereby submits its initial comments on the 2012 National Electric Transmission Congestion Study (the 2012 Study). The WIA is an instrumentality of the State of Wyoming, created in 2004 by the Wyoming State Legislature and is tasked with "diversifying and expanding the Wyoming economy through improvements in the state's electric transmission infrastructure and to facilitate the consumption of Wyoming energy by planning, financing, constructing, developing, acquiring, maintaining and operating electric transmission facilities, advanced coal technology facilities, advanced energy technology facilities

318

How Financial Transmission Rights Curb Market Power  

E-Print Network [OSTI]

PWP-049 How Financial Transmission Rights Curb Market Power Steven Stoft June 1997 This paper is part of the working papers series of the Program on Workable Energy Regulation (POWER). POWER is a program of the University of California Energy Institute, a multicampus research unit of the University

California at Berkeley. University of

319

Integration of NDE Reliability and Fracture Mechanics  

SciTech Connect (OSTI)

The Pacific Northwest Laboratory is conducting a four-phase program for measuring and evaluating the effectiveness and reliability of in-service inspection (lSI} performed on the primary system piping welds of commercial light water reactors (LWRs). Phase I of the program is complete. A survey was made of the state of practice for ultrasonic rsr of LWR primary system piping welds. Fracture mechanics calculations were made to establish required nondestrutive testing sensitivities. In general, it was found that fatigue flaws less than 25% of wall thickness would not grow to failure within an inspection interval of 10 years. However, in some cases failure could occur considerably faster. Statistical methods for predicting and measuring the effectiveness and reliability of lSI were developed and will be applied in the "Round Robin Inspections" of Phase II. Methods were also developed for the production of flaws typical of those found in service. Samples fabricated by these methods wilI be used in Phase II to test inspection effectiveness and reliability. Measurements were made of the influence of flaw characteristics {i.e., roughness, tightness, and orientation) on inspection reliability. These measurernents, as well as the predictions of a statistical model for inspection reliability, indicate that current reporting and recording sensitivities are inadequate.

Becker, F. L.; Doctor, S. R.; Heas!er, P. G.; Morris, C. J.; Pitman, S. G.; Selby, G. P.; Simonen, F. A.

1981-03-01T23:59:59.000Z

320

Coiled transmission line pulse generators  

DOE Patents [OSTI]

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

322

Report: Impacts of Demand-Side Resources on Electric Transmission Planning  

Broader source: Energy.gov [DOE]

Demand for new transmission can be driven by different factors, including connection of new generation, reliability, economics, environmental policy compliance and replacement of retiring infrastructure. This report assesses the relationship between high levels of demand-side resources (including end-use efficiency, demand response, and distributed generation) and investment in new transmission or utilization of existing transmission.

323

Reliable quantum computers  

Science Journals Connector (OSTI)

...the performance of a useful quantum computer will need to be. And that in itself...by the Department of Energy under Grant No. DE- FG03-92-ER40701, and...Lond. A (1998) Reliable quantum computers 409 References Aharonov, D. & Ben-Or...

1998-01-01T23:59:59.000Z

324

Wood Durability Service & Reliability  

E-Print Network [OSTI]

Wood Durability Laboratory Service & Reliability Equipment & Facilities Field sites for AWPA E-7 (mold) tests. Wood weathering facilities. Lab-scale pressure treating cylin- ders. X-ray preservative analyzer (Oxford Twin-X). State-of-the-art facilities for wood and plastics composites manufacturing

325

North American Electric Reliability Council Power Outage Update |  

Broader source: Energy.gov (indexed) [DOE]

Power Outage Update Power Outage Update North American Electric Reliability Council Power Outage Update The bulk electric transmission system in the United States and Canada has been restored and is operating reliably. Many of the generating units that tripped off line during the outage have returned to service and additional generating units are expected to return to service over the weekend. Virtually all customers have been returned to electric service, although some customers will continue to experience rotating outages due to generating capacity availability. North American Electric Reliability Council Power Outage Update More Documents & Publications Electric System Update: Sunday August 17, 2003 North American Electric Reliability Council Outage Announcement NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report

326

DOE - NETL Internal Program Review - June 10, 2010  

Broader source: Energy.gov (indexed) [DOE]

DOE-CERTS Transmission Reliability R&D DOE-CERTS Transmission Reliability R&D Internal Program Review: Load as a Resource (LAAR) September 20, 2012 Lawrence Berkeley National Laboratory, Building 90 Room TBD: signage will be posted at the building entrance Agenda 8:00 am Light refreshments available Welcome, Introductions, DOE remarks Phil Overholt, DOE, and Joe Eto, LBNL 8:30 Frequency Responsive Demand Jeff Dagle, PNNL 9:10 Frequency Responsive Load Evaluation and Benefits on Power System Grid Isabelle Snyder, ORNL (by phone) 9:50 Break 10:20 Load as a Regulation Resource, Phase 2 Sila Kiliccote, LBNL 11:00 Scoping Study on Industrial Regulation Nasr Alkadi, ORNL 11:40 Integration and Extension of Direct Load Management of Smart Loads Anna Scaglioni, UC Davis

327

North American Electric Reliability Corporation Interconnections...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

North American Electric Reliability Corporation Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability...

328

Reliability of Electrical Interconnects (Presentation)  

SciTech Connect (OSTI)

This presentation discusses the status of NREL's research on the reliability of electrical interconnects.

Devoto, D.

2014-06-01T23:59:59.000Z

329

National Transmission Grid Study  

Broader source: Energy.gov (indexed) [DOE]

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

330

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

331

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan was prepared Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CTF. #12; ii #12; iii

332

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007 Investment Plan was prepared with contribution from the following Energy Commission staff and consultants Kondoleon, Chuck Najarian. 2007 Strategic Transmission Investment Plan. California Energy Commission

333

Updating the Electric Grid: An Introduction to Non-Transmission  

Broader source: Energy.gov (indexed) [DOE]

Updating the Electric Grid: An Introduction to Non-Transmission Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Throughout the United States a consensus has emerged that an improved transmission system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance barriers which delay implementation of needed transmission improvements. As State decision makers consider transmission investments, it may be important to account for Non-Transmission Alternatives (NTA). NTAs are programs and technologies that complement and improve operation of existing transmission systems that individually or in combination defer or eliminate the need for upgrades to

334

Updating the Electric Grid: An Introduction to Non-Transmission  

Broader source: Energy.gov (indexed) [DOE]

Updating the Electric Grid: An Introduction to Non-Transmission Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Throughout the United States a consensus has emerged that an improved transmission system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance barriers which delay implementation of needed transmission improvements. As State decision makers consider transmission investments, it may be important to account for Non-Transmission Alternatives (NTA). NTAs are programs and technologies that complement and improve operation of existing transmission systems that individually or in combination defer or eliminate the need for upgrades to

335

Corrosion resistance of transmission structures fabricated from weathering steel  

SciTech Connect (OSTI)

Introduced to utilities in the late 1960's, weathering steel' appeared to offer a way to reduce structure weight and maintenance of lattice towers through the application of bare, high strength steel that had natural corrosion resistance. Weathering steel found wide application in lattice and tubular transmission structures. Through its service life, however, the weathering steel showed evidence of continuing corrosion rather than the expected protection from corrosion. A consortium of utilities was formed to investigate the impact on structure reliability of the continuing corrosion of the steel beyond initial expectations. Through the completion of field surveys and laboratory tests, projected lifetime corrosion rates, structural integrity and potential sealer/penetrant systems were evaluated. The investigation has shown that existing lattice and tubular structures fabricated from weathering steel will provide continued reliable service with minimal maintenance programs. Weathering Steel remains practical for new lattice and tubular structures provided steps are taken during the design process to minimize the retention and collection of moisture between and around metal contact surfaces and during the operation of the line to minimize vegetation encroachment around structures.

Goodwin, E.J. (Sverdrup Technology TLMRC, Haslet, TX (United States)); Pohlman, J.C.

1993-01-01T23:59:59.000Z

336

Transmission Utilization Group (TUG)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Intertie Initiatives Intertie Open Season Transmission Utilization...

337

Transmission Commercial Project Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

338

Underground Power Transmission  

Science Journals Connector (OSTI)

...The type of transmission line for a particular...will force rt transmission lines to be ground near...history of power transmission shows that d-c...characteristics of a d-c line, it is easy to...Best data fit III II I...

P. H. Rose

1970-10-16T23:59:59.000Z

339

Complex Technical Systems Operation, Reliability, Availability, Safety and Cost Optimization  

Science Journals Connector (OSTI)

The methods based on the results of the joint model linking a semi-Markov modeling of the system operation processes with a multistate approach to system reliability and safety and the linear programming are prop...

Krzysztof Ko?owrocki; Joanna Soszy?ska-Budny

2011-01-01T23:59:59.000Z

340

FY13 Budget Request for the Office of Electricity Delivery and Energy Reliability  

Broader source: Energy.gov (indexed) [DOE]

Current Current Appropriation FY 2012 Enacted Appropriation FY 2013 Request Research and Development Clean Energy Transmission and Reliability 25,272 25,414 24,000 Electricity Systems Hub 20,000 Smart Grid Research and Development 28,188 23,909 14,400 Energy Storage 19,440 19,924 15,000 Cyber Security for Energy Delivery Systems 29,160 29,889 30,000 SUBTOTAL Research and Development 102,060 99,136 103,400 Permitting, Siting, and Analysis 6,000 6,976 6,000 Infrastructure Security and Energy Restoration 6,100 5,981 6,000 Program Direction 27,610 27,010 27,615 SUBTOTAL, Electricity Delivery and Energy Reliability 141,770 139,103 143,015 Transfer from State Department 100 Use of Prior Year Balances/Rescission -3,700 TOTAL, Electricity Delivery and Energy Reliability 138,170 139,103 143,015

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Vice President, Transmission Marketing & Sales  

Broader source: Energy.gov [DOE]

Within Transmission Services at Bonneville Power Administration (BPA), Transmission Marketing and Sales (TS) provides open access to the Federal Transmission System (FTS) consistent with...

342

2013 Reliability & Markets Peer Review - Day 1 Presentations | Department  

Broader source: Energy.gov (indexed) [DOE]

1 Presentations 1 Presentations 2013 Reliability & Markets Peer Review - Day 1 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 6 - 7, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Ben Hobbs (Johns Hopkins), Kameshwar Poolla (UC Berkeley) Session II: Ray Zimmerman (Cornell), Hsiao-Dong Chiang (Cornell) Session III: Shmuel Oren (UC Berkeley), Dan Tylavsky (U Arizona), Tom Overbye (U Illinois) Session IV: Lindsay Anderson (Cornell), HyungSeon Oh (Cornell) 2013 R&M Peer Review - Assessing Transmission Investments Under Uncertainty - Ben Hobbs, Johns Hopkins 2013 R&M Peer Review - Coordinated Aggregation of Distributed Energy Resources - Kameshwar Poolla, UC Berkeley

343

2012 Reliability & Markets Peer Review - Presentation Summaries |  

Broader source: Energy.gov (indexed) [DOE]

Review - Presentation Summaries Review - Presentation Summaries 2012 Reliability & Markets Peer Review - Presentation Summaries The Transmission Reliability R&D Reliability & Markets Peer Review included 11 presentations over 2 days on August 7 - 8, 2012 at Cornell University in Ithaca, NY. Presentation summaries are available below. The full presentations are also available. 2012 R&M Peer Review - Summary: Transmission Investment Under Uncertainty - Ben Hobbs 2012 R&M Peer Review - Summary: Renewable Integration Through Risk-Limiting Dispatch - Pravin Varaiya 2012 R&M Peer Review - Summary: Development and Testing of New Tools - Ray Zimmerman 2012 R&M Peer Review - Summary: Commercialization of the SuperOPF Framework - Hsiao-Dong Chiang 2012 R&M Peer Review - Summary: Essence of Structure Preserving Network

344

The Centralized Reliability Data Organization (CREDO); an Advanced Nuclear Reactor Reliability, Availability, and Maintainability Data Bank and Data Analysis Center  

Science Journals Connector (OSTI)

The Centralized Reliability Data Organization (CREDO) is a data bank and data analysis center, which since 1985 has been jointly ... of Technology Support Programs and Japans Power Reactor and Nuclear Fuel Devel...

H. E. Knee

1991-01-01T23:59:59.000Z

345

Electrochemical Noise Sensors for Detection of Localized and General Corrosion of Natural Gas Transmission Pipelines. Final Report for the Period July 2001-October 2002  

SciTech Connect (OSTI)

The U.S. Department of Energy, National Energy Technology Laboratory funded a Natural Gas Infrastructure Reliability program directed at increasing and enhancing research and development activities in topics such as remote leak detection, pipe inspection, and repair technologies and materials. The Albany Research Center (ARC), U.S. Department of Energy was funded to study the use of electrochemical noise sensors for detection of localized and general corrosion of natural gas transmission pipelines. As part of this, ARC entered into a collaborative effort with the corrosion sensor industry to demonstrate the capabilities of commercially available remote corrosion sensors for use with the Nation's Gas Transmission Pipeline Infrastructure needs. The goal of the research was to develop an emerging corrosion sensor technology into a monitor for the type and degree of corrosion occurring at key locations in gas transmission pipelines.

Bullard, Sophie J.; Covino, Jr., Bernard S.; Russell, James H.; Holcomb, Gordon R.; Cramer, Stephen D.; Ziomek-Moroz, Margaret

2002-12-01T23:59:59.000Z

346

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

347

Program  

Office of Scientific and Technical Information (OSTI)

Extremophiles 2004 Extremophiles 2004 5th International Conference on Extremophiles SEPTEMBER 19 -23, 2004 CAMBRIDGE, MARYLAND Extremophiles 2004 5th International Conference on Extremophiles © 2004, American Society for Microbiology 1752 N Street, N.W. Washington, DC 20036-2904 Phone: 202-737-3600 World Wide Web: www.asm.org All Rights Reserved Printed in the United States of America ISBN: 1-55581 324-0 TABLE OF CONTENTS General Information Scientific Program Abstracts for Oral Sessions Abstracts for Poster Sessions Index 4 10 18 42 144 4 ASM Conferences EXECUTIVE COMMITTEE Frank Robb, Chair University of Maryland Biotechnology Institute Michael W. Adams University of Georgia Koki Horikoshi Japan Agency for Marine-Earth Science and Technology Robert M. Kelly North Carolina State University Jennifer Littlechild

348

CERTS 2012 Program Review - NASPI Leadership and Task Team Technical Support - Jeff Dagle, PNNL  

Broader source: Energy.gov (indexed) [DOE]

PNNL Support for NASPI PNNL Support for NASPI Jeff Dagle Pacific Northwest National Lab jeff.dagle@pnnl.gov 11/12 June 2012 Washington, DC OE Transmission Reliability Program Review 2 Project Objective(s) To improve the reliable operation of the North American power system by successfully transitioning synchrophasor technologies from research to industry adoption PNNL's activities in support of NASPI include:  Facilitate leadership and planning activities for the NASPI leadership team and work group meetings  Support the NASPI website, mailing lists, and task team administrative support (e.g., conference call scheduling and facilitation) PNNL Activities in Support of NASPI in FY12 (cont.)  Special assignments

349

Substation Configuration Reliability 1 Reliability of Substation Configurations  

E-Print Network [OSTI]

Substation Configuration Reliability 1 Reliability of Substation Configurations Daniel Nack, Iowa substation, it still contains what could be described as weak points or points of failure that would lead to loss of load. By knowing how to calculate the reliability of different substation configurations

McCalley, James D.

350

Increasing the Reliability of Reliability Jochen Brocker1,  

E-Print Network [OSTI]

Increasing the Reliability of Reliability Diagrams Jochen Br¨ocker1, and Leonard A. Smith1,2 1 University Oxford, UK Corresponding Author, cats@lse.ac.uk November 9, 2006 #12;Abstract The reliability; for the most part, ambiguities arise from variation in the distribution of forecast probabilities and from

Stevenson, Paul

351

Reliability Calculus: A Theoretical Framework To Analyze Communication Reliability  

E-Print Network [OSTI]

distribution function (CDF) of the message delays can be used as a metric to infer communication reliability. Note that the communication reliability (end-to-end delay distribution) depends on the delay-to-end delay distribution over possible routes and under different protocols to provide reliability or quality

Liu, Xue

352

Colorado/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission < Colorado Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Colorado is part of the Western Interconnection power grid, which covers most of the western United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the

353

Wind Energy Transmission | Open Energy Information  

Open Energy Info (EERE)

Wind Energy Transmission Wind Energy Transmission Jump to: navigation, search Just a few years ago, 5% wind energy penetration in the United States was a lofty goal. In Europe, however, some countries have already reached wind energy penetrations of 10% or higher in a short period of time. The growth of domestic wind generation over the past decade has sharpened the focus on two questions: Can the electrical grid accommodate very high amounts of wind energy without jeopardizing security or degrading reliability? And, given that the nation's current transmission infrastructure is already constraining further development of wind generation in some regions, how could significantly larger amounts of wind energy be developed? The answers to these questions could hold the keys to determining how much of a role

354

Arizona/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Arizona/Transmission < Arizona Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Arizona is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including Arizona. WECC

355

Montana/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Montana/Transmission < Montana Jump to: navigation, search MontanaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Montana is part of both the Eastern and Western Interconnection power grids and is part of two NERC regions - the Midwest Reliability Organization (MRO) and Western Electricity Coordinating Council (WECC). MRO's service territory extends from the state of Nebraska north to

356

Nevada/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Nevada/Transmission < Nevada Jump to: navigation, search NevadaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Nevada is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in Nevada.

357

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

358

Comments on RFI on Permitting of Transmission Lines Available | Department  

Broader source: Energy.gov (indexed) [DOE]

Comments on RFI on Permitting of Transmission Lines Available Comments on RFI on Permitting of Transmission Lines Available Comments on RFI on Permitting of Transmission Lines Available April 3, 2012 - 2:12pm Addthis On October 5, 2011, the White House announced the creation of a Rapid Response Team for Transmission (RRTT). In support of the RRTT the Department of Energy's Office of Electricity Delivery and Energy Reliability released a Federal Register Notice seeking information on questions related to permitting of transmission lines. The Request for Information focused on making the development times for generation and transmission more commensurate with one another. Public comments received from the following organizations are now available for review and downloading. - Allegheny Highlands Alliance - American Electric Power

359

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect (OSTI)

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

360

Electric Transmission Lines (Nebraska) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Nebraska) Nebraska) Electric Transmission Lines (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Siting and Permitting Provider Public Service Commission The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Fundamentals of Structural Reliability Theory  

Science Journals Connector (OSTI)

Structural reliability analysis differs in many important ways from reliability analysis as practised in, for example, the electronics and aero-space industries, in spite of the fact that the underlying probab...

Palle Thoft-Christensen Ph. D.

1982-01-01T23:59:59.000Z

362

KRS Chapter 278: Electric Generation and Transmission Siting (Kentucky) |  

Broader source: Energy.gov (indexed) [DOE]

KRS Chapter 278: Electric Generation and Transmission Siting KRS Chapter 278: Electric Generation and Transmission Siting (Kentucky) KRS Chapter 278: Electric Generation and Transmission Siting (Kentucky) < Back Eligibility Commercial Developer Investor-Owned Utility Municipal/Public Utility Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Kentucky Program Type Environmental Regulations Provider Kentucky Public Service Commission No person shall commence to construct a merchant electric generating facility until that person has applied for and obtained a construction certificate for the facility from the Kentucky State Board on Electric Generation and Transmission. The construction certificate shall be valid

363

Energy Conversion and Transmission Facilities (South Dakota) | Department  

Broader source: Energy.gov (indexed) [DOE]

Energy Conversion and Transmission Facilities (South Dakota) Energy Conversion and Transmission Facilities (South Dakota) Energy Conversion and Transmission Facilities (South Dakota) < Back Eligibility Utility Commercial Investor-Owned Utility Industrial Construction Municipal/Public Utility Installer/Contractor Rural Electric Cooperative Retail Supplier Institutional Systems Integrator Fuel Distributor Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Dakota Program Type Siting and Permitting Provider South Dakota Public Utilities Commission This legislation applies to energy conversion facilities designed for or capable of generating 100 MW or more of electricity, wind energy facilities with a combined capacity of 100 MW, certain transmission facilities, and

364

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

365

FIELD RELIABILITY OF ELECTRONIC SYSTEMS  

E-Print Network [OSTI]

: ELECTRONIC EQUIPMENT; FAILURES; RELIABILITY; RISK ANALYSIS; SYSTEM ANALYSIS UDC: 621.38.004.64 ISBN 87 Predicted and Observed Reliability 16 3.3. Source 3 16 3.3.1. Description (Reactor Gamma Monitor) 16 3I Ww i 1 i FIELD RELIABILITY OF ELECTRONIC SYSTEMS wcwotoias R I S 0 - M - 2 4 1 8 An analytical

366

Testing for PV Reliability (Presentation)  

SciTech Connect (OSTI)

The DOE SUNSHOT workshop is seeking input from the community about PV reliability and how the DOE might address gaps in understanding. This presentation describes the types of testing that are needed for PV reliability and introduces a discussion to identify gaps in our understanding of PV reliability testing.

Kurtz, S.; Bansal, S.

2014-09-01T23:59:59.000Z

367

Singular Layer Transmission for Continuous-Variable Quantum Key Distribution  

E-Print Network [OSTI]

We develop a singular layer transmission model for continuous-variable quantum key distribution (CVQKD). In CVQKD, the transmit information is carried by continuous-variable (CV) quantum states, particularly by Gaussian random distributed position and momentum quadratures. The reliable transmission of the quadrature components over a noisy link is a cornerstone of CVQKD protocols. The proposed singular layer uses the singular value decomposition of the Gaussian quantum channel, which yields an additional degree of freedom for the phase space transmission. This additional degree of freedom can further be exploited in a multiple-access scenario. The singular layer defines the eigenchannels of the Gaussian physical link, which can be used for the simultaneous reliable transmission of multiple user data streams. Our transmission model also includes the singular interference avoider (SIA) precoding scheme. The proposed SIA precoding scheme prevents the eigenchannel interference to reach an optimal transmission over a Gaussian link. We demonstrate the results through the adaptive multicarrier quadrature division-multiuser quadrature allocation (AMQD-MQA) CVQKD multiple-access scheme. We define the singular model of AMQD-MQA and characterize the properties of the eigenchannel interference. We propose the SIA precoding of Gaussian random quadratures and the optimal decoding at the receiver. We show a random phase space constellation scheme for the Gaussian sub-channels. The singular layer transmission provides improved simultaneous transmission rates for the users with unconditional security in a multiple-access scenario, particularly in crucial low signal-to-noise ratio regimes.

Laszlo Gyongyosi

2014-02-20T23:59:59.000Z

368

Stream Control Transmission Protocol  

Science Journals Connector (OSTI)

This document describes the Stream Control Transmission Protocol (SCTP). SCTP is designed to transport PSTN signaling messages over IP networks, but is capable of broader applications.

R. Stewart; Q. Xie; K. Morneault; C. Sharp; H. Schwarzbauer; T. Taylor; I. Rytina; M. Kalla; L. Zhang; V. Paxson

2000-10-01T23:59:59.000Z

369

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

370

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

371

Transmission Line Security Monitor  

SciTech Connect (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

372

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

373

Safety of Gas Transmission and Distribution Systems (Maine) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Safety of Gas Transmission and Distribution Systems (Maine) Safety of Gas Transmission and Distribution Systems (Maine) Safety of Gas Transmission and Distribution Systems (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Maine Program Type Safety and Operational Guidelines Provider Public Utilities Commission These regulations describe requirements for the participation of natural gas utilities in the Underground Utility Damage Prevention Program,

374

Topic A and B Awardee: Electric Reliability Council of Texas | Department  

Broader source: Energy.gov (indexed) [DOE]

Technology Development » Transmission Planning » Technology Development » Transmission Planning » Recovery Act Interconnection Transmission Planning » Learn More About Interconnections » Topic A and B Awardee: Electric Reliability Council of Texas Topic A and B Awardee: Electric Reliability Council of Texas The Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to 22 million Texas customers - representing 85 percent of the state's electric load and 75 percent of the Texas land area. As the independent system operator for the region, ERCOT schedules power on an electric grid that connects 40,000 miles of transmission lines and more than 550 generation units. ERCOT also manages financial settlement for the competitive wholesale bulk-power market and administers customer switching

375

Electricity Policy Technical Assistance Program | Department...  

Energy Savers [EERE]

Program Electricity Policy Technical Assistance Program Overview Since 2003, the U.S. Department of Energy's Office of Electricity Delivery and Energy Reliability (OE) has been...

376

Energy Transmission and Infrastructure  

SciTech Connect (OSTI)

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); analyze the potential within the district to utilize farm wastes to produce biofuels; enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; identify the policy, regulatory, and financial barriers impeding development of a new energy system; and improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the Colleges yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

377

Lamont Jackson Office of Electricity Delivery and Energy Reliability  

Broader source: Energy.gov (indexed) [DOE]

March 28, 2012 March 28, 2012 Lamont Jackson Office of Electricity Delivery and Energy Reliability Mail Code: OE-20 U.S. Department of Energy 1000 Independence Avenue, S.W. Washington, D.C. 20585 OE Docket No. RRTT-IR-001 Submitted via email to: Lamont.Jackson@hq.doe.gov COMMENTS OF THE AMERICAN WIND ENERGY ASSOCIATION ON THE DEPARTMENT OF ENERGY'S REQUEST FOR INFORMATION RELATED TO THE PERMITTING OF TRANSMISSION LINES Dear Mr. Jackson, The American Wind Energy Association 1 (AWEA) appreciates the opportunity to provide comments to the Department of Energy's Office of Electricity Delivery and Energy Reliability (DOE) on its request for information

378

Integrated Transmission and Distribution Control  

SciTech Connect (OSTI)

Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: Develop a simulation environment for integrating transmission and distribution control, Construct reduced-order controllable models for smart grid assets at the distribution level, Design and validate closed-loop control strategies for distributed smart grid assets, and Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

2013-01-16T23:59:59.000Z

379

2012 National Electric Transmission Congestion Study: Preliminary Findings - updated presentation  

Broader source: Energy.gov (indexed) [DOE]

Meyer Meyer Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 2012 National Electric Transmission Congestion Study Preliminary Findings Stakeholder Consultation Webinars August 2012 Background  The Energy Policy Act of 2005 amended the Federal Power Act to require DOE to conduct a transmission congestion study every three years, in consultation with the states.  DOE published a study in 2006, and a second for 2009 (in early 2010). We are now preparing the 2012 study.  Statutory text directs DOE to seek to identify "geographic areas experiencing ... transmission capacity constraints or congestion that adversely affects consumers ...."  Statute also authorizes (but does not require) the Secretary

380

Nuclear weapon reliability evaluation methodology  

SciTech Connect (OSTI)

This document provides an overview of those activities that are normally performed by Sandia National Laboratories to provide nuclear weapon reliability evaluations for the Department of Energy. These reliability evaluations are first provided as a prediction of the attainable stockpile reliability of a proposed weapon design. Stockpile reliability assessments are provided for each weapon type as the weapon is fielded and are continuously updated throughout the weapon stockpile life. The reliability predictions and assessments depend heavily on data from both laboratory simulation and actual flight tests. An important part of the methodology are the opportunities for review that occur throughout the entire process that assure a consistent approach and appropriate use of the data for reliability evaluation purposes.

Wright, D.L. [Sandia National Labs., Albuquerque, NM (United States)

1993-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Request for Information on Permitting of Transmission Lines: Federal  

Broader source: Energy.gov (indexed) [DOE]

Request for Information on Permitting of Transmission Lines: Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 The Department of Energy's Office of Electricity Delivery and Energy Reliability requested information on questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion

382

Notice of Technical Workshop in Support of 2009 Electric Transmission  

Broader source: Energy.gov (indexed) [DOE]

Notice of Technical Workshop in Support of 2009 Electric Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 The Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability (OE) conducted a Technical Workshop to receive input from subject matter experts on the historical transmission data in the Western and Eastern Interconnections and on studies of future transmission projections within the two Interconnections. Technical Workshop in Support of 2009 Electric Transmission Congestion Study - Federal Register Vol 74 No. 32 - Feb. 19, 2009.pdf More Documents & Publications

383

DOE Seeking Information on Transmission Line Permitting | Department of  

Broader source: Energy.gov (indexed) [DOE]

Seeking Information on Transmission Line Permitting Seeking Information on Transmission Line Permitting DOE Seeking Information on Transmission Line Permitting February 27, 2012 - 3:25pm Addthis The Department of Energy's Office of Electricity Delivery and Energy Reliability is seeking information on the questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local, and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion projects of national and regional significance. This Request for

384

Notice of Technical Workshop in Support of 2009 Electric Transmission  

Broader source: Energy.gov (indexed) [DOE]

Notice of Technical Workshop in Support of 2009 Electric Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 Notice of Technical Workshop in Support of 2009 Electric Transmission Congestion Study: Federal Register Volume 74, No. 32 - Feb. 19, 2009 The Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability (OE) conducted a Technical Workshop to receive input from subject matter experts on the historical transmission data in the Western and Eastern Interconnections and on studies of future transmission projections within the two Interconnections. Technical Workshop in Support of 2009 Electric Transmission Congestion Study - Federal Register Vol 74 No. 32 - Feb. 19, 2009.pdf More Documents & Publications

385

Request for Information on Permitting of Transmission Lines: Federal  

Broader source: Energy.gov (indexed) [DOE]

Request for Information on Permitting of Transmission Lines: Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 The Department of Energy's Office of Electricity Delivery and Energy Reliability requested information on questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion

386

Form EIA-411, "Coordinated Bulk Power Supply Program Report," | OpenEI  

Open Energy Info (EERE)

411, "Coordinated Bulk Power Supply Program Report," 411, "Coordinated Bulk Power Supply Program Report," Dataset Summary Description The Form EIA-411, "Coordinated Bulk Power Supply Program Report," collects information from the Nation's power system planners about the electricity supply, both capacity and energy, that is needed to serve current demand and for future growth. The reported data can be used to examine such issues as: the reliability of the U.S. electricity system; projections which assess future demand growth and plans for constructing new generating and transmission facilities; and consequences of unavailable or constrained capacity on usage of the existing generation base. Reliability of the electric power system covers three areas: the security of the electrical systems; the usage of

387

Chapter Three - Pipeline Reliability Assessment  

Science Journals Connector (OSTI)

Abstract Another aspect of pipeline integrity management is the assessment of system reliability over the age of the pipeline. In order to assess the aging effects through the pipes lifetime, a reliability assessment is carried out for the pipeline or its segment. The assessment of the residual stress effect is carried out by evaluating the reliability of new uncorroded pipelines, which are assumed to be free from any flaw. The influence of residual stress parameters, mean, and coefficient of variation are considered in the reliability assessment.

Ramesh Singh

2014-01-01T23:59:59.000Z

388

Reliability Assessment of Distribution Systems.  

E-Print Network [OSTI]

?? A stable and reliable electric power supply system is an inevitable pre-requisite for the technological and economic growth of any nation. Due to this, (more)

Dorji, Tempa

2009-01-01T23:59:59.000Z

389

Office of Electricity Delivery &amp; Energy Reliability Contributors |  

Broader source: Energy.gov (indexed) [DOE]

Office of Electricity Delivery & Energy Reliability » Office of Office of Electricity Delivery & Energy Reliability » Office of Electricity Delivery & Energy Reliability Contributors Office of Electricity Delivery & Energy Reliability Contributors June 20, 2012 David Ortiz, OE-40 David Ortiz is Deputy Assistant Secretary for Energy Infrastructure Modeling and Analysis (EIMA) in the Department of Energy's Office of Electrici April 25, 2013 Eric Lightner June 22, 2011 Henry S. Kenchington, OE-50 Mr. Henry (Hank) Kenchington is Deputy Assistant Secretary (DAS) for the Advanced Grid Integration Division in the Department of Energy's Office of Electricity Delivery and Energy Reliability. He is responsible for the strategic management of the $3.4 billion Smart Grid Investment Grant program funded under the American Recovery and Reinvestment Act of 2009 to

390

Texas Uses Phasors to Increase Electricity Reliability | Department of  

Broader source: Energy.gov (indexed) [DOE]

Uses Phasors to Increase Electricity Reliability Uses Phasors to Increase Electricity Reliability Texas Uses Phasors to Increase Electricity Reliability March 31, 2011 - 12:57pm Addthis Merrill Smith Program Manager, Office of Electricity Delivery & Energy Reliability What does this mean for me? Phasor measurement units are part of a comprehensive approach to managing the variability from renewable sources, particularly wind. This project will enable more effective use of renewable energy sources by helping to illustrate solutions for managing unpredictability and promote reliability on the grid. As any businessperson will tell you, a key to long-term success is the ability to foresee potential problems and limit risk. In the electricity industry this ability can prevent grid events, like unexpected

391

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

392

Sample sizes for confidence limits for reliability.  

SciTech Connect (OSTI)

We recently performed an evaluation of the implications of a reduced stockpile of nuclear weapons for surveillance to support estimates of reliability. We found that one technique developed at Sandia National Laboratories (SNL) under-estimates the required sample size for systems-level testing. For a large population the discrepancy is not important, but for a small population it is important. We found that another technique used by SNL provides the correct required sample size. For systems-level testing of nuclear weapons, samples are selected without replacement, and the hypergeometric probability distribution applies. Both of the SNL techniques focus on samples without defects from sampling without replacement. We generalized the second SNL technique to cases with defects in the sample. We created a computer program in Mathematica to automate the calculation of confidence for reliability. We also evaluated sampling with replacement where the binomial probability distribution applies.

Darby, John L.

2010-02-01T23:59:59.000Z

393

Microsoft Word - CX-SpacerInsulatorRepProgram3rd4thQtr2013_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

July 15, 2013 July 15, 2013 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Frank Weintraub Project Manager - TEP-TPP-1 Corinn Castro Program Manager - TPO-TPP-3 Proposed Action: 2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects Budget Information: Work Order #00255064 PP&A Project No.: PP&A 1899 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance Proposed by: Bonneville Power Administration (BPA) Location: Various transmission lines located within BPA's Service Area. See Table 1 for locations of transmission lines. Description of the Proposed Action: In order to provide continued system reliability, BPA proposes to replace worn spacers and insulators along various transmission lines throughout

394

The design of a reliable reputation system  

E-Print Network [OSTI]

a peer reliability metric based on the distribution ofa higher reliability score. The most reliable distribution,distribution for the Sybil colluder and a sharp drop in its reliability

Swamynathan, Gayatri; Almeroth, Kevin C.; Zhao, Ben Y.

2010-01-01T23:59:59.000Z

395

Transmission Access Resources  

Broader source: Energy.gov [DOE]

Historically, the addition of new electric generation facilities has been accompanied by new transmission systems. For example, large nuclear and coal plants built in the 1960s and 1970s required...

396

Performance Incentives for Transmission  

E-Print Network [OSTI]

The Federal Energy Regulatory Commission's Standard Market Design Notice of Public Rule- making (SMD NOPRPerformance Incentives for Transmission FERC's Standard Market Design should accommodate of California at Berkeley. The research described in this article was supported by National Grid, USA

Oren, Shmuel S.

397

Designing electricity transmission auctions  

E-Print Network [OSTI]

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

398

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

399

Audio Transmission Systems  

Science Journals Connector (OSTI)

Audio transmission systems are the means by which audio signals are routed, processed, and assigned to the desired monitor and recording output channels. In the early days of electrical recording, rarely more ...

John Eargle

1986-01-01T23:59:59.000Z

400

Transmission Grid Integration  

Broader source: Energy.gov [DOE]

The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Media-based Modulation: A New Approach to Wireless Transmission  

E-Print Network [OSTI]

in energy with respect to a K ? K traditional MIMO are achieved. Similar energy savings are possible in SISO, the corresponding received constellation will consist of M = 2Rm points. It is obviously possible, and indeed constellation transmits Rs + Rm bits which are channel coded to achieve reliable transmission over

Waterloo, University of

402

Hardware implementation of data transmission control based on Boolean transformation  

Science Journals Connector (OSTI)

In this paper an analysis and realization of Data Transmission Control based on Boolean Transformation for increasing the reliability of checksum and echoplex error detection has been proposed. Such transformations are used to amplify single errors and ... Keywords: SAC functions, checksum, echoplex, error control systems, error detection

N. G. Bardis; E. G. Bardis; A. P. Markovskyy; C. Economou

2005-07-01T23:59:59.000Z

403

Honda Transmission Technical Center  

High Performance Buildings Database

Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

404

North American Electric Reliability Corporation Interconnections...  

Broader source: Energy.gov (indexed) [DOE]

Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability Corporation Interconnection showing the Eastern,...

405

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance...  

Broader source: Energy.gov (indexed) [DOE]

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report The following information...

406

Physics-Based Stress Corrosion Cracking Component Reliability  

Broader source: Energy.gov (indexed) [DOE]

Physics-Based Stress Corrosion Physics-Based Stress Corrosion Cracking Component Reliability Model cast in an R7-Compatible Cumulative Damage Framework Draft Report Supporting Technology Inputs to the Risk- Informed Safety Margin Characterization Pathway of the DOE Light Water Reactor Sustainability Program Stephen D. Unwin Kenneth I. Johnson Robert F. Layton Peter P. Lowry Scott E. Sanborn Mychailo B. Toloczko PNNL-20596 July 2011 Physics-Based SCC Reliability Model in a Cumulative Damage Framework 2 Physics-Based SCC Reliability Model in a Cumulative Damage Framework 3 Table of Contents Executive Summary............................................................................... 4 1. Introduction .......................................................................... 5

407

Transmission Right Of Way  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

408

Open Access Transmission Tariff  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

409

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

Agencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary General Transmission...

410

National Electric Transmission Congestion Study Webinars | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

411

Planning considerations for the intermountain HVDC transmission system  

SciTech Connect (OSTI)

Planning of an HVDC transmission system embedded into an existing ac network may require unique control and converter equipment capability in order to satisfy stability requirements of the network. The planning and design of the Intermountain Power Project HVDC transmission system are based on unique control performance features for power transfers during terminal ac faults, rapid power recovery following fault clearing and utilization of exceptionally high transient overload capability of 2 per unit during the post-fault period to maintain system stability. The Department, in its efforts to meet the Western Systems Coordinating Council's (WSCC) reliability criteria, developed and incorporated into its HVDC specifications very rigorous reliability and availability requirements. One objective of this project was to attain the unusually low bipolar converter system outage frequency goal of one outage in five years to achieve a bipole performance rating equivalent to two ac circuits of similar capability. The reliability goals of this project have provided one of the impetus for revisions to the WSCC Reliability Criteria for System Design. The reliability goals and other features adopted for the Intermountain HVDC transmission system are discussed in this paper and study results are included to demonstrate the effectiveness of various controls implemented as stability enhancement techniques.

Lee, R.L.; Beshir, M.J.; Gee, J.H.

1986-01-01T23:59:59.000Z

412

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

413

Kangley - Echo Lake Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

STATEMENT STATEMENT Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Kangley-Echo Lake Transmission Line Project State Involved: Washington Abstract: BPA is proposing to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmis- sion line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as

414

Recovery Act Interconnection Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Act Interconnection Act Interconnection Transmission Planning Recovery Act Interconnection Transmission Planning View a Map of the Interconnections View a Map of the Interconnections Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. Pursuant to Title IV of the American Reinvestment and Recovery Act (2009), the Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48

415

Electricity Transmission, A Primer | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

416

EIS-0378: Port Angeles-Juan de Fuca Transmission Project, WA  

Broader source: Energy.gov [DOE]

This EIS assesses DOE decision to approve the Sea Breeze Transmission project for a Presidential permit for through DOE's Office of Electricity Delivery and Energy Reliability and for approval for interconnection into the federal transmission system through the Bonneville Power Administration (BPA).

417

Electricity Reliability Council of Texas (ERCOT) | Open Energy Information  

Open Energy Info (EERE)

Electricity Reliability Council of Texas (ERCOT) Electricity Reliability Council of Texas (ERCOT) Jump to: navigation, search The Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to 22 million Texas customers - representing 85 percent of the state's electric load and 75 percent of the Texas land area. As the independent system operator for the region, ERCOT schedules power on an electric grid that connects 40,000 miles of transmission lines and more than 550 generation units. ERCOT also manages financial settlement for the competitive wholesale bulk-power market and administers customer switching for 6.5 million Texans in competitive choice areas. News ERCOT gathers wind data from cellphone towers References ERCOT This article incorporates public domain material from the document:

418

NREL: Gearbox Reliability Collaborative - About the Gearbox Reliability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Gearbox Reliability Collaborative About the Gearbox Reliability Collaborative Premature gearbox failures have a significant impact on the cost of wind farm operations. In 2007, NREL initiated the Gearbox Reliability Collaborative (GRC). The project combines field testing, dynamometer testing, analysis, modeling, condition monitoring, development of a failure database, and operations and maintenance research in a multi-pronged approach to determine why wind turbine gearboxes do not always achieve their expected design life-the time period that manufacturers expect them to last. The collaborative of manufacturers, owners, operators, researchers, and consultants focuses on gearbox modeling and testing and the development of a gearbox failure database. Collaborative members also investigate gearbox

419

(DOE/EIS-0285/SA-5): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

March 30, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOEEIS-0285SA-5) - Big Eddy-Ostrander...

420

North Dakota Energy Conversion and Transmission Facility Siting Act (North  

Broader source: Energy.gov (indexed) [DOE]

Dakota Energy Conversion and Transmission Facility Siting Act Dakota Energy Conversion and Transmission Facility Siting Act (North Dakota) North Dakota Energy Conversion and Transmission Facility Siting Act (North Dakota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State North Dakota Program Type Line Extension Analysis

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

422

Webinar: Understanding the Interconnection and Transmission Service Queues  

Broader source: Energy.gov (indexed) [DOE]

Webinar: Understanding the Interconnection and Transmission Service Webinar: Understanding the Interconnection and Transmission Service Queues Webinar: Understanding the Interconnection and Transmission Service Queues March 5, 2012 - 6:10pm Addthis This webinar will take place March 28, 2012, from 11 a.m.-12:30 p.m. MDT. Hosted by the U.S. Department of Energy's (DOE's) Office of Indian Energy Policy and Programs, DOE's Tribal Energy Program, the Environmental Protection Agency (EPA), and the Western Area Power Administration, this Web seminar will answer the following questions: What is the large generator interconnection procedure? How is transmission service requested? What does this mean for Tribes interested in gaining access to the transmission system? This is the fifth in a series of webinars that will run through September 2012.

423

Florida Electric Transmission Line Siting Act (Florida) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission Line Siting Act (Florida) Electric Transmission Line Siting Act (Florida) Florida Electric Transmission Line Siting Act (Florida) < Back Eligibility Commercial Construction Developer Fed. Government Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection The Transmission Line Siting Act (TLSA) is the state's centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15 miles or longer. An

424

Hybrid Transmission Corridor study  

SciTech Connect (OSTI)

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

425

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

426

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

427

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

428

Energy-Efficient Broadcast and Multicast Trees for Reliable Wireless Communication Suman Banerjee, Archan Misra, Jihwang Yeo, Ashok Agrawala  

E-Print Network [OSTI]

1 Energy-Efficient Broadcast and Multicast Trees for Reliable Wireless Communication Suman Banerjee the transmission range. The problem of determining minimum aggregate transmission energy trees is known to be NP-Hard for the broadcast case [5]. Compu- tation of similar minimum energy multicast trees in wired en- vironments

Banerjee, Suman

429

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

430

Electric Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

431

10-Yr. Transmission Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

432

Demand responsive programs - an emerging resource for competitive electricity markets?  

SciTech Connect (OSTI)

The restructuring of regional electricity markets in the U.S. has been accompanied by numerous problems, including generation capacity shortages, transmission congestion, wholesale price volatility, and reduced system reliability. These problems have created significant new opportunities for technologies and business approaches that allow load serving entities and other aggregators, to control and manage the load patterns of their wholesale or retail end-users. These technologies and business approaches for manipulating end-user load shapes are known as Load Management or, more recently, Demand Responsive programs. Lawrence Berkeley National Laboratory (LBNL) is conducting case studies on innovative demand responsive programs and presents preliminary results for five case studies in this paper. These case studies illustrate the diversity of market participants and range of technologies and business approaches and focus on key program elements such as target markets, market segmentation and participation results; pricing scheme; dispatch and coordination; measurement, verification, and settlement; and operational results where available.

Heffner, Grayson C. Dr.; Goldman, Charles A.

2001-06-25T23:59:59.000Z

433

Photovoltaics performance and reliability workshop  

SciTech Connect (OSTI)

This document consists of papers and viewgraphs compiled from the proceedings of a workshop held in September 1992. This workshop was the fifth in a series sponsored by NREL/DOE under the general subject areas of photovoltaic module testing and reliability. PV manufacturers, DOE laboratories, electric utilities and others exchanged technical knowledge and field experience. The topics of cell and module characterization, module and system performance, materials and module durability/reliability research, solar radiation, and applications are discussed.

Mrig, L. (ed.) [ed.

1992-01-01T23:59:59.000Z

434

National Electric Transmission Congestion Study 2006 Executive Summary  

Broader source: Energy.gov (indexed) [DOE]

EXECUTIVE EXECUTIVE SUMMARY AUGUST 2006 U.S. Department of Energy NATIONAL ELECTRIC TRANSMISSION CONGESTION STUDY EXECUTIVE SUMMARY AUGUST 2006 U.S. Department of Energy Executive Summary Section 1221(a) of the Energy Policy Act of 2005 amended the Federal Power Act (FPA) by adding a new section 216 to that Act. FPA section 216(a) di- rected the Secretary of Energy to conduct a nation- wide study of electric transmission congestion 1 by August 8, 2006. Based upon the congestion study, comments thereon, and considerations that include economics, reliability, fuel diversity, national en- ergy policy, and national security, the Secretary may designate "any geographic area experiencing electric energy transmission capacity constraints or congestion that adversely affects customers as a na- tional interest electric transmission corridor." The national congestion study

435

Transmission SEAB Presentation  

Broader source: Energy.gov (indexed) [DOE]

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

436

Continuously variable transmission  

SciTech Connect (OSTI)

This patent describes a power transmission apparatus. It comprises: a body, a pinion gear, a cam means, first and second gear rack pairs, preventing means;l first and second rack support means, a rotor mounted for rotation about a rotor axis, the rotor having rotor engaging means for engaging the rack support means so as to transmit power therebetween.

Irvin, P.J.E.

1992-07-14T23:59:59.000Z

437

Autonomous data transmission apparatus  

DOE Patents [OSTI]

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

438

Borehole data transmission apparatus  

DOE Patents [OSTI]

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

439

HEU Minimization and the Reliable Supply of Medical Isotopes Nuclear  

National Nuclear Security Administration (NNSA)

HEU Minimization and the Reliable Supply of Medical Isotopes Nuclear HEU Minimization and the Reliable Supply of Medical Isotopes Nuclear Security Summit: Fact Sheet | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Fact Sheets > HEU Minimization and the Reliable Supply of ... Fact Sheet HEU Minimization and the Reliable Supply of Medical Isotopes Nuclear

440

Real Time Grid Reliability Management 2005  

E-Print Network [OSTI]

loss of two 345 kV transmission lines Jim Bridger KinportStar South Canton 345-kV transmission lines. The blackoutflashover of the 380 kV transmission lines Mettlen Lavorgo

Eto, Joe

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS  

E-Print Network [OSTI]

RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS Guy Roussel on the uninspected part of the tubing. 1 INTRODUCTION In Pressurized Water Reactors, a program of periodic in for determining the percentage of tubes sampled is to provide, by means of a statistical analysis, an equation

Cizelj, Leon

442

Reliability centered maintenance (RCM) products - future  

SciTech Connect (OSTI)

This paper summarizes products related to RCM of power systems which will soon be available. The titles include: substation RCM handbook and software; substation RCM driven productive maintenance; transmission RCM evaluation; transmission inspection and maintenance workstation; transmission inspection and detection methods; substation RCM implementation and software support; substation maintenance management workstation; transmission RCM handbook and software; transmission inspection and maintenance workstation - TC; distribution RCM handbook and software; transmission RCM implementation and software support; and distribution RCM implementation and software support.

Lyons, P.F.

1996-08-01T23:59:59.000Z

443

Reliability and Functional Availability of HVAC Systems  

E-Print Network [OSTI]

This paper presents a model to calculate the reliability and availability of heating, ventilation and air conditioning systems. The reliability is expressed in the terms of reliability, maintainability and decision capability. These terms are a...

Myrefelt, S.

2004-01-01T23:59:59.000Z

444

Constructing Reliable Distributed Communication Systems with CORBA  

E-Print Network [OSTI]

Constructing Reliable Distributed Communication Systems with CORBA Silvano Maffeis Douglas C Communication software and distributed services for next- generation applications must be reliable, efficient model to support reliable data- and process- oriented distributed systems that communicate through syn

Schmidt, Douglas C.

445

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

446

Smart Grid Investments Improve Grid Reliability, Resilience,...  

Energy Savers [EERE]

Investments Improve Grid Reliability, Resilience, and Storm Responses (November 2014) Smart Grid Investments Improve Grid Reliability, Resilience, and Storm Responses (November...

447

Electricity & Energy Reliability (WFP) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Electricity & Energy Reliability (WFP) Electricity & Energy Reliability (WFP) The purpose of the workforce Plan is to provide focus and direction to Human Resources (HR) strategy....

448

ELECTRICITY DELIVERY AND ENERGY RELIABILITY Appropriation Overview  

Broader source: Energy.gov (indexed) [DOE]

ELECTRICITY DELIVERY AND ENERGY RELIABILITY Appropriation Overview Electricity Delivery and Energy Reliability (OE) drives electric grid modernization and resiliency in the energy...

449

Thermoelectric Materials By Design: Mechanical Reliability (Agreement...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Materials By Design: Mechanical Reliability (Agreement 14957) Thermoelectric Materials By Design: Mechanical Reliability (Agreement 14957) Presentation from the U.S. DOE Office of...

450

Transmission Siting_071508.indd  

Broader source: Energy.gov (indexed) [DOE]

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

451

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

452

Patterns of Transmission Investment  

E-Print Network [OSTI]

long term performance contracts with a developer of an HVDC transmission link to expand interconnection capacity between TSOs with no or limited interconnections and with large sustained differences in prices. Merchant investments supported... truly separate AC networks. For example, by building HVDC inter-connectors between two separate networks, opportunities to increase trades of power from high price to low priced areas can be exploited. The HVDC link between the England and France...

Joskow, Paul

2006-03-14T23:59:59.000Z

453

Electronic reliability estimation: how reliable are the results?  

Science Journals Connector (OSTI)

The development of Safety Critical Systems requires the compliance to several safety standards and regulations. Since, most of the times, human life is at stake, it is crucial to fully understand the behaviour of the system being developed in order to ... Keywords: MIL-Hdbk-217F, MTTF, estimation, reliability

Nuno Silva; Rui Lopes

2012-09-01T23:59:59.000Z

454

Applied Energy Programs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Applied Energy Programs Applied Energy Programs Applied Energy Programs Los Alamos is using its world-class scientific capabilities to enhance national energy security by developing energy sources with limited environmental impact and by improving the efficiency and reliability of the energy infrastructure. CONTACT US Acting Program Director Melissa Fox (505) 663-5538 Email Applied Energy Program Office serves as the hub connecting the Laboratory's scientific and technical resources to DOE sponsors, DoD programs, and to industry. The Applied Energy Program Office manages Los Alamos National Laboratory programs funded by the Department of Energy's (DOE's) Offices of Energy Efficiency/Renewable Energy, Electricity Delivery and Energy Reliability, and Fossil Energy. With energy use increasing across the nation and the

455

Boardman to Hemingway Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

456

Program Development  

SciTech Connect (OSTI)

This presentation covers how to go about developing a human reliability program. In particular, it touches on conceptual thinking, raising awareness in an organization, the actions that go into developing a plan. It emphasizes evaluating all positions, eliminating positions from the pool due to mitigating factors, and keeping the process transparent. It lists components of the process and objectives in process development. It also touches on the role of leadership and the necessity for audit.

Atencio, Julian J.

2014-05-01T23:59:59.000Z

457

Transmission Line Circuit Alexander Glasser  

E-Print Network [OSTI]

Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

Anlage, Steven

458

Electric generating or transmission facility: determination of rate-making  

Broader source: Energy.gov (indexed) [DOE]

Electric generating or transmission facility: determination of Electric generating or transmission facility: determination of rate-making principles and treatment: procedure (Kansas) Electric generating or transmission facility: determination of rate-making principles and treatment: procedure (Kansas) < Back Eligibility Municipal/Public Utility Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Kansas Program Type Generating Facility Rate-Making Provider Kansas Corporation Commission This legislation permits the KCC to determine rate-making principles that will apply to a utility's investment in generation or transmission before constructing a facility or entering into a contract for purchasing power. There is no restriction on the type or the size of electric generating unit

459

Natural Gas Transmission Pipeline Intrastate Regulatory Act (Florida) |  

Broader source: Energy.gov (indexed) [DOE]

Transmission Pipeline Intrastate Regulatory Act Transmission Pipeline Intrastate Regulatory Act (Florida) Natural Gas Transmission Pipeline Intrastate Regulatory Act (Florida) < Back Eligibility Commercial Construction Developer Fuel Distributor Industrial Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Utility Program Info State Florida Program Type Safety and Operational Guidelines Provider Florida Public Service Commission The regulation of natural gas intrastate transportation and sale is deemed to be an exercise of the police power of the state for the protection of the public welfare. The Public Service Commission is empowered to fix and regulate rates and services of natural gas transmission companies, including, without limitation, rules and regulations for determining the

460

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Structural Reliability of Ceramics at High Temperature: Mechanisms of Fracture and Fatigue Crack Growth  

SciTech Connect (OSTI)

Final report of our DOE funded research program. Aim of the research program was to provide a fundamental basis from which the mechanical reliability of layered structures may be understood, and to provide guidelines for the development of technologically relevant layered material structures with optimum resistance to fracture and subcritical debonding. Progress in the program to achieve these goals is described.

Reinhold H. Dauskardt

2005-08-01T23:59:59.000Z

462

Electricity Delivery and Energy Reliability  

Broader source: Energy.gov (indexed) [DOE]

The Office of Electricity Delivery and Energy Reliability (OE) drives electric grid modernization and resiliency in the energy infrastructure while working to enable innovation across the energy sector, empowering American consumers, and securing our energy future. The OE mission and the leadership role OE plays in the energy industry directly support the President's effort to accelerate the transformation of America's energy system

463

Producing reliable software: an experiment  

Science Journals Connector (OSTI)

A customer of high assurance software recently sponsored a software engineering experiment in which a small real-time software system was developed concurrently by two popular software development methodologies. One company specialized in the state-of-the-practice ... Keywords: capability maturity model, cleanroom certification, formal methods, software development methodologies, software engineering experiment, software process and product metrics, software reliability

Carol Smidts; Xin Huang; James C. Widmaier

2002-04-01T23:59:59.000Z

464

Office of Electricity Delivery and Energy Reliability, OE-20  

Broader source: Energy.gov (indexed) [DOE]

6, 2012 6, 2012 Office of Electricity Delivery and Energy Reliability, OE-20 U.S. Department of Energy 1000 Independence Avenue SW Washington, DC 20585 RE: Comments for Consideration in the Preparation of the 2012 National Electric Transmission Congestion (NIETC) Study. Sugarloaf Conservancy, Inc. is a registered 501 (c)(3) grassroots organization formed to protect and enhance the quality of life in Frederick County, Maryland, by education on issues related to wetlands, streams, meadows, rivers, forests, view sheds, conservation, restoration, and preservation. For the last three years, our focus has been opposing the overhead PATH high voltage power lines. Pursuant to the request for comments, as noted in a Federal Register Notice initiating preparations for development of the 2012 National Electric Transmission Congestion Study,

465

Lamont Jackson Office of Electricity Delivery and Energy Reliability  

Broader source: Energy.gov (indexed) [DOE]

March 28, 2012 March 28, 2012 Lamont Jackson Office of Electricity Delivery and Energy Reliability Mail Code: OE-20 U.S. Department of Energy 1000 Independence Avenue SW Washington, D.C. 20585 Via email to: Lamont.Jackson@hq.doe.gov Re: Comments on Questions Related to Permitting of Transmission Lines, 77 Fed. Reg. 11517 (Feb. 27, 2012) Dear Mr. Jackson: Thank you for the opportunity to submit comments on questions related to the permitting of transmission lines. We, the undersigned conservation organizations, are working to address the threat of climate change by advocating for significant increases in renewable energy and energy conservation measures. Our nation's addiction to fossil fuels, coupled with the unprecedented threats brought about by

466

Transmission/Photo Gallery | Open Energy Information  

Open Energy Info (EERE)

Colorado transmission 2.jpg Bird diverters.jpg Transmission insulators.jpg Retrieved from "http:en.openei.orgwindex.php?titleTransmissionPhotoGallery&oldid687595...

467

Solar reliability and materials library. Volume 2. User's manual  

SciTech Connect (OSTI)

This user's manual is the second of two volumes documenting the solar reliability and materials program (SRMP) library at Argonne National Laboratory (ANL). The first volume presents an overview of the solar reliability and materials library. This volume describes the data card formats, identification codes, and dictionaries used in recording data and compiling reliability statistics on solar energy systems. The library is structured around the solar heating and cooling system demonstration sites sponsored by the Department of Energy (DOE). Sufficient flexibility has been built into the coding plan to expand the library to include other solar energy systems. As with any reliability library, the structure will change with time and the needs of the solar energy community. As changes in structure occur, updated editions of the user's manual will be issued to incorporate them. Some of the programs that have been developed using the Statistical Analysis System (SAS) processor are presented to indicate the steps to be followed in linking the various SAS procedures into a production algorithm. Because SAS is a versatile system, other programs and outputs can be generated.

Singh, H.; Wolosewicz, R.M.; Singh, I.

1980-09-01T23:59:59.000Z

468

NREL: Transmission Grid Integration - Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

469

Reliability-based optimization using evolutionary algorithms  

Science Journals Connector (OSTI)

Uncertainties in design variables and problem parameters are often inevitable and must be considered in an optimization task if reliable optimal solutions are sought. Besides a number of sampling techniques, there exist several mathematical approximations ... Keywords: Ditlevsen's bound, Pareto-optimal front, evolutionary multiobjective optimization, most probable point, reliability-based optimization, reliable front, system reliability

Kalyanmoy Deb; Shubham Gupta; David Daum; Jrgen Branke; Abhishek Kumar Mall; Dhanesh Padmanabhan

2009-10-01T23:59:59.000Z

470

Mr. Lamont Jackson Office of Electricity Delivery and Energy Reliability  

Broader source: Energy.gov (indexed) [DOE]

8, 2012 8, 2012 Mr. Lamont Jackson Office of Electricity Delivery and Energy Reliability Mail Code: OE-20 U.S. Department of Energy 1000 Independence Avenue SW Washington, DC 20585 Submitted via email to: Lamont.Jackson@hq.doe.gov Re: Department of Energy - Rapid Response Team for Transmission Request for Information, RRTT-IR-01, 77 Fed. Reg. 11517 (Feb. 27, 2012) Dear Mr. Jackson: Southern California Edison Company submits these comments in response to the Department of Energy's Request for Information concerning the efforts to resolve the issue of "incongruent development timelines" for the siting and permitting of electricity

471

Technical information report: Plasma melter operation, reliability, and maintenance analysis  

SciTech Connect (OSTI)

This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

Hendrickson, D.W. [ed.

1995-03-14T23:59:59.000Z

472

Application Filling Requirements for Transmission Line and Substation  

Broader source: Energy.gov (indexed) [DOE]

Application Filling Requirements for Transmission Line and Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Wind Solar Program Info

473

Algorithms for an Integer Multicommodity Network Flow Problem with Node Reliability Considerations  

Science Journals Connector (OSTI)

In this paper, we consider the problem of sending a set of multiple commodities from their origin to destination nodes via intermediate hubs. Each hub node is associated with a reliability function, which depends on the total flow that crosses that hub. ... Keywords: Congestion, Cutting planes, Integer programming, Multicommodity flow, Node reliabilities

Bita Tadayon, J. Cole Smith

2014-05-01T23:59:59.000Z

474

Transmission Workshop | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

475

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network [OSTI]

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

476

Arnold Schwarzenegger TRANSMISSION BENEFIT  

E-Print Network [OSTI]

RECOVERY PIERFINALPROJECTREPORT Prepared For: California Energy Commission Public Interest Energy Research Authorization No: MR0606/MR-051 Prepared For: Public Interest Energy Research (PIER) California Energy Commission Jamie Patterson Contract Manager Mike Gravely Program Area Lead ENERGY SYSTEMS INTEGRATION Mike

477

Understanding Bulk Power Reliability: The Importance of Good Data and A  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Understanding Bulk Power Reliability: The Importance of Good Data and A Understanding Bulk Power Reliability: The Importance of Good Data and A Critical Review of Existing Sources Title Understanding Bulk Power Reliability: The Importance of Good Data and A Critical Review of Existing Sources Publication Type Report Year of Publication 2012 Authors Fisher, Emily, Joseph H. Eto, and Kristina Hamachi LaCommare Pagination 11 Date Published 01/2012 Publisher LBNL City Berkeley Keywords electricity markets and policy group, energy analysis and environmental impacts department, power system reliability, power system reliability metrics, transmission system reliability Abstract Bulk power system reliability is of critical importance to the electricity sector. Complete and accurate information on events affecting the bulk power system is essential for assessing trends and efforts to maintain or improve reliability. Yet, current sources of this information were not designed with these uses in mind. They were designed, instead, to support real-time emergency notification to industry and government first-responders. This paper reviews information currently collected by both industry and government sources for this purpose and assesses factors that might affect their usefulness in supporting the academic literature that has relied upon them to draw conclusions about the reliability of the US electric power system.

478

Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar  

Broader source: Energy.gov [DOE]

The SunShot Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar (PREDICTS) program is taking a physics- and chemistry-based approach to identifying failure modes...

479

Achieving A Long Term Business Impact by Improving the Energy Effectiveness and Reliability of Electric Motors  

E-Print Network [OSTI]

capability. The Corporate Motor Technology Team (CMTT) conceived and led a program to optimize the cost effectiveness and reliability of new motors and developed criteria to determine whether to repair or replace motors that fail. The higher energy efficiency...

Whelan, C. D.

480

Abstract --Under a context of transmission open access, a methodology to define a common transmission trunk system  

E-Print Network [OSTI]

Terms--Transmission systems, Transmission pricing, Cooperative games, Shapley value, Transmission open

Catholic University of Chile (Universidad Católica de Chile)

Note: This page contains sample records for the topic "transmission reliability program" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Reinforcing Power Grid Transmission with FACTS Devices  

E-Print Network [OSTI]

We explore optimization methods for planning the placement, sizing and operations of Flexible Alternating Current Transmission System (FACTS) devices installed into the grid to relieve congestion created by load growth or fluctuations of intermittent renewable generation. We limit our selection of FACTS devices to those that can be represented by modification of the inductance of the transmission lines. Our master optimization problem minimizes the $l_1$ norm of the FACTS-associated inductance correction subject to constraints enforcing that no line of the system exceeds its thermal limit. We develop off-line heuristics that reduce this non-convex optimization to a succession of Linear Programs (LP) where at each step the constraints are linearized analytically around the current operating point. The algorithm is accelerated further with a version of the cutting plane method greatly reducing the number of active constraints during the optimization, while checking feasibility of the non-active constraints post...

Frolov, Vladimir; Chertkov, Misha

2013-01-01T23:59:59.000Z

482

Image processing application maps optimal transmission routes  

SciTech Connect (OSTI)

The process of selecting an optimal route for a transmission line is complex as it involves technical, social, economic, environmental, and planning aspects. A new method was developed to help engineers select routes of specific transmission lines. The methodology is based on the use of satellite images of the geographic region in which the line will cross. The selection process searches for the most economical alternative and the one with the least environmental impact within the area of concern. This is achieved by using an image recognition software package and a program that uses minimal path techniques with support of weight restrictions. This article defines the methodology and uses a region of Mexico as an example to illustrate the optimal route-selection process.

Vega, M.; Sarmiento, H.G.

1996-04-01T23:59:59.000Z

483

Energia Sierra Juarez U.S. Transmission Line Draft EIS  

Broader source: Energy.gov (indexed) [DOE]

Energia Sierra Juarez U.S. Transmission Line Project Energia Sierra Juarez U.S. Transmission Line Project Draft Environmental Impact Statement Summary August 2010 U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Washington, DC 20585 Cooperating Agency - County of San Diego San Diego, CA DOE/EIS-0414 Department of Energy Washington, DC 20585 August 2010 Dear Sir/Madam: Enclosed for your review and comment is the Energia Sierra Juarez U.S. Transmission Line Project Draft Environmental Impact Statement (DOE/EIS-0414), prepared by the Department of Energy (DOE) pursuant to the National Environmental Policy Act of 1969 (NEPA) and its implementing regulations. The County of San Diego, California, is a cooperating agency in the preparation of this Draft EIS.

484

National Electric Transmission Congestion Study 2012 - How to Submit  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study 2012 - How to National Electric Transmission Congestion Study 2012 - How to Submit Comments National Electric Transmission Congestion Study 2012 - How to Submit Comments You may submit written comments to Congestionstudy2012@hq.doe.gov or by mail to: Office of Electricity Delivery and Energy Reliability, OE-20 U.S. Department of Energy 1000 Independence Avenue SW. Washington, DC 20585 The Department intends to use only data that is publicly available for this study. Accordingly, please do not submit information that you believe is or should be protected from public disclosure. DOE is responsible for the final determination concerning disclosure or nondisclosure of information submitted to DOE and for treating it in accordance with the DOE's Freedom of Information regulations (10 CFR 1004.11). All comments received by DOE