1

Final Report Navajo Transmission Project (NTP)  

SciTech Connect (OSTI)

The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

Bennie Hoisington; Steven Begay

2006-09-14T23:59:59.000Z

2

Department of Energy Finalizes Loan Guarantee for New Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

for New Transmission for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest February 15, 2011 - 12:00am Addthis Washington, D.C. -- Energy Secretary Steven Chu today announced that the U.S. Department of Energy has finalized a $343 million loan guarantee, supported by the Recovery Act, to develop the One Nevada Transmission Line, known as the ON Line project. The ON Line project, which is jointly owned by Great Basin Transmission South, LLC and NV Energy, consists of a new 500 kilovolt (kV) AC transmission line that will carry approximately 600 megawatts of electricity, including from renewable energy resources, in northern Nevada. This is the Department's first loan guarantee for a

3

Department of Energy Finalizes Loan Guarantee for New Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

Loan Guarantee for New Transmission Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest Department of Energy Finalizes Loan Guarantee for New Transmission Project to Deliver Renewable Energy to Southwest February 15, 2011 - 12:00am Addthis Washington, D.C. -- Energy Secretary Steven Chu today announced that the U.S. Department of Energy has finalized a $343 million loan guarantee, supported by the Recovery Act, to develop the One Nevada Transmission Line, known as the ON Line project. The ON Line project, which is jointly owned by Great Basin Transmission South, LLC and NV Energy, consists of a new 500 kilovolt (kV) AC transmission line that will carry approximately 600 megawatts of electricity, including from renewable energy resources, in northern Nevada. This is the Department's first loan guarantee for a

4

Kangley - Echo Lake Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

STATEMENT STATEMENT Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Kangley-Echo Lake Transmission Line Project State Involved: Washington Abstract: BPA is proposing to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmis- sion line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as

5

BPA/Lower Valley Transmission Project Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

1 1 Summary Summary * The Purpose and Need for Action * Alternatives * Affected Environment * Impacts This summary gives the major points of the Final Environmental Impact Statement (EIS) prepared for the BPA/Lower Valley Transmission Project by Bonneville Power Administration (BPA). BPA is the lead federal agency on this project and supervises the preparation of the EIS. The U.S. Forest Service is a cooperating agency and assists BPA in EIS preparation. The Targhee and Bridger-Teton National Forests are crossed by BPA's existing transmission line and some of the alternatives. S.1 Purpose and Need For Action S.1.1 BPA Lower Valley Power and Light, Inc. (LVPL) buys electricity from BPA and then supplies it to the residences, farms and businesses of the Jackson and Afton, Wyoming areas. Since the late 1980s,

6

BPA/Lower Valley Transmission Project Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

1 9 9 7 1 9 9 7 B PA / L O W E R VA L L E Y T R A N S M I S S I O N P R O J E C T Final Environmental Impact Statement DOE/EIS-0267 J U N E 1 9 9 8 Bonneville Power Administration PO Box 3621 Portland, Oregon 97208-3621 DOE/BP-3067 JUNE 1998 450 Final Environmental Impact Statement BPA/Lower Valley Transmission Project Bonneville Power Administration U.S. Department of Energy and Forest Service U.S. Department of Agriculture June 1998 Table of Contents - i Table of Contents Summary ............................................................................................................................ S-1 S.1 Purpose and Need For Action ................................................................................................ S-1 S.1.1 BPA ...............................................................................................................................................

7

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

and and Wallula - McNary Transmission Line Project Final Environmental Impact Statement DOE/EIS-0330 Lead Agencies Bonneville Power Administration Washington State Energy Facility Site Evaluation Council Cooperating Agencies Bureau of Land Management U.S. Fish and Wildlife Service August 2002 EFSEC Washington State Energy Facility Site Evaluation Council August 2002 Dear Reader: Enclosed for your reference is the abbreviated form Final Environmental Impact Statement (FEIS) for the proposed Wallula Power Project and Wallula-McNary Transmission Line Project. This document is designed to supplement or correct information provided in the Draft Environmental Impact Statement (DEIS). The proponent, Wallula Generation, LLC, has requested to build a 1,300-megawatt, gas-fired

8

Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Port Angeles-Juan de Fuca Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement DOE/EIS-0378 October 2007 Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement DOE/EIS - 0378 D e p a r t m e n t o f E n e r g y Office of Electricity Delivery and Energy Reliability and Bonneville Power Administration October 2007 Port Angeles-Juan de Fuca Transmission Project DOE/EIS-0378 Responsible Agency: U.S. Department of Energy (DOE): Office of Electricity Delivery and Energy Reliability (OE) and Bonneville Power Administration (BPA) Title of Proposed Project: Port Angeles-Juan de Fuca Transmission Project State Affected: Washington (WA) Abstract: Sea Breeze Olympic Converter LP (Sea Breeze) has applied to DOE for authorizations and approvals

9

Kangley - Echo Lake Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

STATEMENT - APPENDICES STATEMENT - APPENDICES Appendices Appendix A Addition to Appendix A, Final Fisheries Technical Report Appendix D Final Wetlands Technical Report Appendix F Geology, Soil, Climate, and Hydrology Technical Report Appendix U Addition to Appendix U, Letter from the National Marine Fisheries Service Appendix Y Drinking Water Regulations Appendix Z Updated EMF Information Appendix AA Letter from the U.S. Fish and Wildlife Service Table of Contents Addition to Appendix A Final Fisheries Technical Report Appendix A. Data and Comments for Streams, Map and Aerial Photo-Based Surveys Appendix A. Table A-1. Data and comments for streams, map and airphoto-based survey. Stream name Number KC Class 1 Description of RMZ Segment Potential Resident

10

DOE/EA-1602: Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (November 2008)  

Broader source: Energy.gov (indexed) [DOE]

Alternative Intake Project Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment November 2008 DOE/EA-1602 DOE/EA-1602 Final Environmental Assessment for the Western Area Power Administration Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water quality strategy to protect and improve water quality for its customers, the Contra Costa Water District (CCWD) is implementing the Alternative Intake Project (AIP). The AIP will enable CCWD to relocate some of its existing diversions to Victoria Canal, a Delta location with higher-quality source water than is currently available at its Old River and Rock Slough intakes. The AIP project purpose is to protect and improve the quality of water delivered to CCWD's untreated-

11

Schultz-Hanford Area Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense January 2003 Final Environmental Impact Statement Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA), Richland Operations Office (RL); U.S. Department of Defense, Department of Army (USDOA); U.S. Department of Interior, Bureau of Land Management (BLM), Bureau of Reclamation (BOR), Fish and Wildlife Service (USFWS). Title of Proposed Project: Schultz-Hanford Area Transmission Line Project - DOE/EIS-0325 State Involved: Washington Abstract: BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project

12

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENT, FISH AND WILDLIFE August 30, 2002 In reply refer to: T To: People Interested in the McNary-John Day Transmission Line Project Bonneville Power Administration (Bonneville) has finalized the enclosed Environmental Impact Statement (EIS) for the McNary-John Day Transmission Line Project. In March, we sent you the draft EIS, asked for your comments and had three public meetings. The response was great; we received about 350 comments on the draft document. Thank you for taking the time to read the document and tell us your ideas. This letter briefly describes the final EIS, outlines our next steps and tells where to call if you have questions. The final EIS is abbreviated, consisting of an introduction to the document, changes to the draft

13

Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed.

N /A

2002-08-16T23:59:59.000Z

14

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Final EIS Appendix A: Revised Mitigation Measures Final EIS Appendix A: Revised Mitigation Measures August 2002 Page A-1 Appendix A Revised Mitigation Measures The proposed project includes measures that would limit construction and operation impacts to elements of the natural and human environment. These measures are presented for each element of the environment identified as a potential concern by Bonneville and EFSEC based on preliminary environmental review and public and regulatory agency input. Updates to the mitigation table below are in response to comments on the Draft EIS or to incorporate new information included in the Settlement Agreements. Mitigation Measure Power Plant Pipelines Bonneville T-Line EARTH Seismicity Facilities would be designed to meet regional seismic design criteria as presented in the Uniform Building Code (UBC). X X

15

Final environmental impact statement, Washington Water Power/B.C. Hydro Transmission Interconnection Project  

SciTech Connect (OSTI)

Washington Water Power (WWP) proposes to construct and operate an electric transmission line that would connect with the electrical system of the British Columbia Hydro and Power Authority (B.C. Hydro). The project would be composed of a double-circuit, 230-kilovolt (kV) transmission line from WWP`s existing Beacon Substation located northeast of Spokane, Washington to the international border located northwest of Metaline Falls, Washington. The original Presidential permit application and associated proposed route presented in the draft environmental impact statement (DEIS) have been modified to terminate at the Beacon Substation, instead of WWP`s initially proposed termination point at the planned Marshall Substation located southwest of Spokane. A supplemental draft EIS was prepared and submitted for review to not only examine the new proposed 5.6 miles of route, but to also compare the new Proposed Route to the other alternatives previously analyzed in the DEIS. This final EIS (FEIS) assesses the environmental effects of the proposed transmission line through construction, operation, maintenance, and abandonment activities and addresses the impacts associated with the Proposed Action, Eastern Alternative, Western Alternative, Northern Crossover Alternative, Southern Crossover Alternative, and No Action Alternative. The FEIS also contains the comments received and the responses to these comments submitted on the DEIS and Supplemental DEIS.

Not Available

1992-10-01T23:59:59.000Z

16

EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

17

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

18

Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Assessment Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA -1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA-1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Table of Contents CH-MM & AU-CH Transmission Line Rebuild Table of Contents i Table of Contents Summary ......................................................................................................................................... 1 1.0 Introduction ..................................................................................................................

19

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

20

Summit-Watertown transmission line project, South Dakota. Final Environmental Assessment  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) needs to rebuild the existing Summit-Watertown 115-kV transmission line, located in northeastern South Dakota, and western Minnesota. Nearly 60 percent of the existing facility was replaced in 1965 after severe ice-loading broke structures and wires. Because of the extensive loss of the line, surplus poles had to be used to replace the damaged H-frame structures. These were of varying sizes, causing improper structure loading. Additionally, the conductors and overhead shield wires have been spliced in numerous places. This provides additional space on these wires for icing and wind resistance, which in turn create problems for reliability. Finally, a progressive fungal condition has weakened the poles and, along with the improper loading, has created an unsafe condition for maintenance personnel and the general public.

Not Available

1993-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

United States. Bonneville Power Administration.

1995-08-01T23:59:59.000Z

22

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

23

Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

N /A

2003-06-20T23:59:59.000Z

24

Final EIS for Champlain Hudson Power Express Transmission Project Now Available  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) has prepared a Final Environmental Impact Statement (EIS) to evaluate the potential environmental impacts in the United States of the proposed action to issue a Presidential permit to the Applicant, Champlain Hudson Power Express, Inc. (CHPEI), and the range of reasonable alternatives.

25

NREL: Transmission Grid Integration - Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects NREL's transmission integration projects provide data and models that help utilities and policymakers make informed decisions about the integration of variable generation,...

26

Transmission Commercial Project Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

27

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

28

Regional Transmission Projects: Finding Solutions  

SciTech Connect (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

29

Project Final Report UBC LBS Project Services1 Project Final Report UBC LBS Project Services2  

E-Print Network [OSTI]

Project Final Report UBC LBS Project Services1 #12;Project Final Report UBC LBS Project Services2 EXECUTIVE SUMMARY The purpose of the UBC Project Services web-based project management portal project on campus within Project Services, and with the rest of the UBC community. We began this project by defining

30

Campus Climate Project Final Report  

E-Print Network [OSTI]

Campus Climate Project Final Report Oregon State University January 2005 #12;Rankin & Associates, Consulting OSU Campus Climate Assessment Project Final Report January 2005 1 Table of Contents Executive Campus Climate Assessment Project Final Report January 2005 i Executive Summary Resistance begins

Escher, Christine

31

EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada |  

Broader source: Energy.gov (indexed) [DOE]

60: Townsite Solar Project Transmission Line, Clark County, 60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 28, 2013 EA-1960: Finding of No Significant Impact Townsite Solar Project Transmission Line, Clark County, Nevada June 28, 2013 EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada

32

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

33

SunZia Southwest Transmission Project Comments  

Broader source: Energy.gov (indexed) [DOE]

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

34

Big Bend-Witten Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Bend-Witten Transmission Line Project The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared a draft environmental...

35

SunZia Southwest Transmission Project Comments  

Energy Savers [EERE]

Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

36

Williston to Stateline Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Williston to Stateline Transmission Line Project, ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental...

37

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

38

Boardman to Hemingway Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

39

Project ACHIEVE final report  

SciTech Connect (OSTI)

Project ACHIEVE was a math/science academic enhancement program aimed at first year high school Hispanic American students. Four high schools -- two in El Paso, Texas and two in Bakersfield, California -- participated in this Department of Energy-funded program during the spring and summer of 1996. Over 50 students, many of whom felt they were facing a nightmare future, were given the opportunity to work closely with personal computers and software, sophisticated calculators, and computer-based laboratories -- an experience which their regular academic curriculum did not provide. Math and science projects, exercises, and experiments were completed that emphasized independent and creative applications of scientific and mathematical theories to real world problems. The most important outcome was the exposure Project ACHIEVE provided to students concerning the college and technical-field career possibilities available to them.

NONE

1997-06-13T23:59:59.000Z

40

Final project report  

SciTech Connect (OSTI)

The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

Nitin S. Baliga and Leroy Hood

2008-11-12T23:59:59.000Z

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Final Project Report  

SciTech Connect (OSTI)

This project pursued innovations to improve energy efficiency and indoor environmental quality (IEQ) in commercial and residential buildings. For commercial buildings, the project developed a testbed for “intelligent nested environmental systems technologies (iNEST),” which monitor and control energy flows and IEQ across a cascade of spaces from individuals’ desktops to office suites to floors to whole buildings. An iNEST testbed was constructed at Syracuse University and was used to assess the use of devices such as personal badges and CO2 sensors to study how reduced energy use and improved IEQ could be achieved. For residential buildings, resources were targeted in support of DoE’s Builders Challenge Program and to recruit Syracuse, NY builders. Three homes in Syracuse’s Near Westside neighborhood were also registered under the program by Syracuse University team, with an additional home registered by one of the builders. Findings from the work at the iNEST testbed facility, and results from other related projects were disseminated through Syracuse Center of Excellence in Environmental and Energy Systems (SyracuseCoE) 2008 Annual Symposium, the 9th International Healthy Buildings 2009 Conference & Exhibition, and through SyracuseCoE’s website and eNewsletters to inform the broader community of researchers, designers and builders. These public communication activities helped enhance the understanding of high performance buildings and facilitate further market acceptance.

Bogucz, E A

2010-12-13T23:59:59.000Z

42

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT Renewable Resource/Transmission Development Scenarios Prepared for: California Energy Commission Prepared by: Center for Energy Efficiency.D. David Olsen Center for Energy Efficiency and Renewable Technologies Sacramento, California 95814

43

Final Project Report  

SciTech Connect (OSTI)

In this entire project period from 2005-2014, we have made significant progress in developing novel nanostructures of metal oxides (MOs) for solar hydrogen generation based on photoelectrochemical (PEC). Materials investigated are focused on 1D and 0D MO nanostructures of TiO2, WO3, ZnO, and Fe2O3 in conjunction with quantum dot (QD) sensitization and chemical doping (N or H) to alter their electronic band structures for both visible light absorption and for facilitating interfacial charge transport. In addition, we have used plasmonic metal nanostructures to enhance the PEC performance by improving light absorption of QDs via enhanced scattering of the plamonic metal. Most importantly, we have discovered a multipronged strategy for improving PEC performance: using plasmonic metal nanostructure to enhance light absorption, QDs to improve charge transfer, and chemical doping to increase charge transport in metal oxides for PEC. The combination is critical for overall high efficiency of PEC. This strategy is developed and demonstrated for the first time to our best knowledge.

Zhang, Jin [University of California Santa Cruz; Zhao, Yiping [University of Georgia at Athens

2014-12-05T23:59:59.000Z

44

DOE/EIS-0378-SA-01: Supplement Analysis for the Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement (DOE/EIS-0378-SA-01) (02/05/08)  

Broader source: Energy.gov (indexed) [DOE]

February 5, 2008 February 5, 2008 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Port Angeles-Juan de Fuca Transmssion Project Final Environmental Impact Statement (DOE/EIS-0378/SA-01) Mark Korsness Project Manager - TEP TPP-3 Proposed Action: Relocation of the marine exit hole for the horizontal directionally drilled (HDD) hole that would be drilled under the Proposed Action. Proposed by: Sea Breeze Olympic Converter LP (Sea Breeze). Location: Port Angeles Harbor near Port Angeles, Washington. Background: As part of its proposed international transmission cable analyzed in the Port Angeles-Juan de Fuca Transmssion Project EIS, Sea Breeze has proposed the drilling of a HDD hole to transition the cable from the sea bed of the Strait of Juan de Fuca to land. The HDD hole

45

TransWest Express Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

operate, maintain and decommission the TransWest Express 600-kV Direct Current Transmission Project. TransWest Express, LLC is a whollyowned subsidiary of the Anschutz...

46

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hot Springs to Anaconda Transmission Line Rebuild Project, Montana EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power...

47

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy Savers [EERE]

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

48

EIS-0499: Great Northern Transmission Line Project, Minnesota...  

Energy Savers [EERE]

EIS-0499: Great Northern Transmission Line Project, Minnesota EIS-0499: Great Northern Transmission Line Project, Minnesota SUMMARY This EIS will evaluate the potential...

49

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon...  

Broader source: Energy.gov (indexed) [DOE]

1: Alvey-Fairview Transmission Line Rebuild Project, Oregon EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon Summary Bonneville Power Administration prepared an EA...

50

Development of superconducting transmission cable. CRADA final report  

SciTech Connect (OSTI)

The purpose of this Cooperative Research and Development Agreement (CRADA) between Oak Ridge National Laboratory (ORNL) and Southwire Company is to develop the technology necessary to proceed to commercialization of high-temperature superconducting (HTS) transmission cables. Power transmission cables are a promising near-term electric utility application for high-temperature superconductivity. Present HTS wires match the needs for a three-phase transmission cable: (1) the wires must conduct high currents in self-field, (2) there are no high forces developed, and (3) the cables may operate at relatively low current density. The commercially-available HTS wires, in 100-m lengths, make construction of a full three-phase, alternating current (ac) transmission cable possible. If completed through the pre-commercialization phase, this project will result in a new capability for electric power companies. The superconducting cable will enable delivery with greater efficiency, higher power density, and lower costs than many alternatives now on the market. Job creation in the US is expected as US manufacturers supply transmission cables to the expanding markets in Asia and to the densely populated European cities where pipe-type cable is prevalent. Finally, superconducting cables may enable delivery of the new, diverse and distributed sources of electricity that will constitute the majority of new installed electrical generation in the world during the coming decades.

Hawsey, R.; Stovall, J.P. [Oak Ridge National Lab., TN (United States); Hughey, R.L.; Sinha, U.K. [Southwire Co., Carrollton, GA (United States)

1997-10-01T23:59:59.000Z

51

US Recovery Act Smart Grid Projects - Electric Transmission Systems | Open  

Open Energy Info (EERE)

American_Transmission_Company_LLC_II_Smart_Grid_Project\" American_Transmission_Company_LLC_II_Smart_Grid_Project\" title=\"American Transmission Company LLC II Smart Grid Project\">American Transmission Company LLC II Smart Grid Project","title":"American Transmission Company LLC II Smart Grid Project","link":null,"lat":43.0116784,"lon":-88.2314813,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Transmission_Company_LLC_Smart_Grid_Project\" title=\"American Transmission Company LLC Smart Grid Project\">American

52

American Transmission Company Comments - 216h Interim Final Rules |  

Broader source: Energy.gov (indexed) [DOE]

American Transmission Company Comments - 216h Interim Final Rules American Transmission Company Comments - 216h Interim Final Rules American Transmission Company Comments - 216h Interim Final Rules American Transmission Company LLC, by its corporate manager, ATC Management Inc. (collectively "ATCLLC") is pleased to have the opportunity to provide the following comments on the additional matters to be considered by DOE in connection with the Rules. Interim Final Rule Comments, RIN 1901-AB18 Coordination of Federal Authorizations for Electric Transmission Facilities More Documents & Publications Comments of the Staff of the public utilities commission of the state of California on the interim final rule Comments on Notice of Proposed Rulemaking for Coordination of Federal Authorizations for Electric Transmission Facilities

53

Department of Energy Finalizes Loan Guarantee for New Transmission...  

Office of Environmental Management (EM)

Nevada, improving grid reliability and efficiency. "As our country increases its use of alternative energy sources, new transmissions lines like the ON Line project will play a...

54

Wallula-McNary Transmission Line Project and Wallula Power Project EIS (DOE/EIS-0030)  

Broader source: Energy.gov (indexed) [DOE]

RECORD OF DECISION for the Wallula-McNary Transmission Line Project and Wallula Power Project THE DECISION The Bonneville Power Administration (BPA) has decided to implement its portion of the proposed action identified in the Wallula Power Project and Wallula-McNary Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0330, August 2002). The proposed action includes construction of the Wallula Power Project (Wallula Project) that has been proposed by Wallula Generation, LLC (Wallula LLC). The proposed Wallula Project is a 1,300- megawatt (MW) natural-gas-fired, combined-cycle turbine power plant that Wallula LLC is planning to construct on a site near the Columbia River in Walla Walla County, Washington, approximately eight miles south of the City of Pasco. BPA's portion of the proposed action

55

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

56

BPA, Transmission, I-5 Corridor Project, data by segments and...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

alternatives for new transmission system facilities, including the new transmission line and substations proposed for the I-5 Corridor Reinforcement Project. Foremost is...

57

DOE/EA-1485: Environmental Assessment for the Nisqually Transmission Line Relocation Project (January 2005)  

Broader source: Energy.gov (indexed) [DOE]

Nisqually Transmission Line Relocation Project Nisqually Transmission Line Relocation Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1485 Bonneville Power Administration January 2005 Nisqually Transmission Line Relocation Project Revision Sheet for Final Environmental Assessment 1 Revision Sheet for the Nisqually Transmission Line Relocation Project Final Environmental Assessment DOE/EA -1485 Summary This revision sheet documents the changes to be incorporated into the Nisqually Transmission Line Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On October 18, 2004, the Preliminary EA was sent to agencies and interested parties. Notification

58

Category:Smart Grid Projects - Electric Transmission Systems | Open Energy  

Open Energy Info (EERE)

Transmission Systems category. Transmission Systems category. Pages in category "Smart Grid Projects - Electric Transmission Systems" The following 10 pages are in this category, out of 10 total. A American Transmission Company LLC II Smart Grid Project American Transmission Company LLC Smart Grid Project D Duke Energy Carolinas, LLC Smart Grid Project E Entergy Services, Inc. Smart Grid Project I ISO New England, Incorporated Smart Grid Project M Midwest Energy Inc. Smart Grid Project Midwest Independent Transmission System Operator Smart Grid Project N New York Independent System Operator, Inc. Smart Grid Project P PJM Interconnection, LLC Smart Grid Project W Western Electricity Coordinating Council Smart Grid Project Retrieved from "http://en.openei.org/w/index.php?title=Category:Smart_Grid_Projects_-_Electric_Transmission_Systems&oldid=214227

59

EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project...  

Broader source: Energy.gov (indexed) [DOE]

5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4,...

60

Microsoft Word - 564M_Biomass_Project Descriptions FINAL 120409...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

564MBiomassProject Descriptions FINAL 120409 Microsoft Word - 564MBiomassProject Descriptions FINAL 120409 Microsoft Word - 564MBiomassProject Descriptions FINAL 120409 More...

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT PROBABILISTIC TRANSMISSION CONGESTION FORECASTING DECEMBER 2012 CEC-500-2013-120 Prepared for: California Energy Commission Prepared by: Electric Research Institute Contract Number: UC MR-052 Prepared for: California Energy Commission Jamie Patterson

62

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT CALIFORNIA TRANSMISSION CONGESTION ASSESSMENT DECEMBER 2007 CEC-500-2011-007 Prepared for: California Energy Commission Prepared by: Electric Pasadena, CA Contract Number: BOA-142 Prepared for: California Energy Commission Jamie Patterson Contract

63

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Broader source: Energy.gov (indexed) [DOE]

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

64

EIS-0377: Big Stone II Power Plant and Transmission Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

7: Big Stone II Power Plant and Transmission Project 7: Big Stone II Power Plant and Transmission Project EIS-0377: Big Stone II Power Plant and Transmission Project SUMMARY A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission line and substation upgrades and modifications that would be required to support the addition of 600 MW of capacity within the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 24, 2009 EIS-0377: Record of Decision Big Stone II Power Plant and Transmission Project June 1, 2009 EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project October 26, 2007 EIS-0377: Supplemental Draft Environmental Impact Statement

65

Schultz-Hanford Area Transmission Line Project (DOE-eis-0325)  

Broader source: Energy.gov (indexed) [DOE]

Schultz-Hanford Area Transmission Line Project Schultz-Hanford Area Transmission Line Project Record of Decision March 2003 Bonneville Power Administration Schultz-Hanford Area Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Schultz-Hanford Area Transmission Line Project in Benton, Douglas, Grant, Kittitas, and Yakima Counties, Washington. BPA has decided to implement the Agency Preferred Alternative identified in the Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0325, January 2003), with the exception of Option 1 of the Sickler-Schultz Reroute. Due to landowner concerns, BPA will now implement Option 2 of the Sickler-Schultz Reroute. The Agency Preferred Alternative consists of constructing a new 500-kilovolt (kV) transmission

66

Transmission Bottleneck Project Report. March 19, 2003 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 The U.S. Department of Energy (DOE) National Transmission Grid Study (DOE 2002) determined that congestion in the U.S. electricity transmission system places daily constraints on electricity trade, increasing both electricity costs to consumers and impacts reliable operations. In an effort to support DOE's investigation of transmission bottlenecks, the Consortium for Electric Reliability Technology Solutions (CERTS) surveyed the current state of transmission congestion around the nation. Transmission Bottleneck Project Report. March 19, 2003 More Documents & Publications Electricity Transmission Congestion Costs: A Review of Recent Reports 2012 National Electric Transmission Congestion Study: Preliminary Findings

67

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

family and multi?family residential buildings, the model is wall area of a building shall be   Multi-Family Rules ofclass Building type Floor area Single-family home all Multi-

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

68

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

2009.   Inverter  Test Procedures Solar Generation Impact Conditioner Testing Procedures  Appendix B: Air Conditioner air conditioner testing procedures and results from studies 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

69

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

R22 PMAXLow (PSI) Phase Refrigerant Charge (LBS) Voltage (V)LRA (AMPS) Phase Refrigerant Charge (LBS) Voltage (V) PMAXR22 PMAXLow (PSI) Phase Refrigerant Charge (LBS) Voltage (V)

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

70

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

at PSE is to collect load data for validating dynamic and approach decomposes recorded load data into different load “to continuously record load data for a selected time period

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

71

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

BPA), the basic requirements for an improved load model were determined. These requirements included modeling the substation

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

72

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

such as synchronous and induction generators.   Most of the as  synchronous and induction generators.   Most of the 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

73

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

Unit Evaporator Coil Size (Tons) Compressor Type Refrigerant SEER FANUnit Evaporator Coil Size (Tons) Compressor Type Refrigerant SEER FANUnit Evaporator Coil Size (Tons) Compressor Type Refrigerant SEER FAN

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

74

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

to be the compact fluorescent bulbs (CFBs) that the engineerbulbs with compact fluorescent bulbs (CFBs) continues to

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

75

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

pump heating fraction, EF heatpump , shall be the fraction q P p P q (P) (Q) (B) Lighting Washing Heating 0.1F heatpump0.3F heatpump Cooling Refrigeration Z q Hotwater Plugs Z p (

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

76

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

commercial building energy use and cost analysis. With input of building layout, construction types, space usage,

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

77

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

and Africa (PVGIS).  National Renewable Energy Laboratory has solar and Africa [14].  National Renewable Energy Laboratory (NREL) has solar 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

78

Hooper Springs Transmission Project Final Environmental Impact...  

Energy Savers [EERE]

like to ensure that our ability to utilize this location as a borrow source for growth media remains unencumbered, which may necessitate BPA re-grading or realigning the access...

79

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

Bulk System Load  Model in GE PSLF TM for Investigating the a Bulk System Load Model in GE PSLF TM for Investigating thecomposite load model in  the PSLF simulation software; the 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

80

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

like hardware (PMU), software and data communication. TheSpecifications and Technical Data PMU Model Number of NumberPMU Specifications and Technical Data ..

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Sundance Energy Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

Sundance Energy LLC (Sundance) has applied to the Western Area Power Administration (Western) to interconnect a planned generator facility to Western's transmission system in the vicinity of Coolidge, Arizona. Western's proposed action is to enter into an interconnection and construction agreement with Sundance for the requested interconnection. The proposed interconnection would integrate the power generated by the Sundance Energy Project (Project) into the regional transmission grid and would allow Sundance to supply its power to the competitive electric wholesale market. The proposed Project would be built on private lands southwest of Coolidge. The proposed Project would be a ''peaking power plant project'' which means it would provide energy when it is needed during peak demand periods in the region. The proposed Project would also be a ''merchant plant'' which means it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the energy generated by the power plant. Western, as a major transmission system owner, must generally provide access to its transmission system when requested by an eligible organization per existing policies, regulations and laws. The proposed Project would consist of the construction and operation of a generating facility; construction of a 14-mile pipeline to supply natural gas to the proposed Facility; a new 230-kV bay at an existing substation; a new double-circuit 230-kV transmission line; a new single-circuit 230-kV transmission line; an upgrade of a 115-kV line to 230-kV specifications; and an upgrade of an existing substation. Three alternatives would consist of different locations of the 230-kV transmission lines and would not involve upgrading the 115-kV line or the existing substation. The environmentally preferred alternative is Alternative 3, the power line routing that is furthest west.

N /A

2001-06-29T23:59:59.000Z

82

EIS-0390: Eastern Plains Transmission Project, Colorado and Kansas.  

Broader source: Energy.gov [DOE]

This EIS is for Western Area Power Administration's proposal to participate with Tri-State Generation and Transmission Association, Inc. (Tri-State), to construct the proposed Eastern Plains Transmission Project (Project). Western’s participation with Tri-State would be in exchange for capacity rights on the transmission lines.

83

FINAL REPORT ARIZONA WATER INSTITUTE PROJECT  

E-Print Network [OSTI]

1-17-08 FINAL REPORT ARIZONA WATER INSTITUTE PROJECT "ARIZONA TRIBAL APPROACHES TO WATER of Arizona. The project, "Arizona Tribal Approaches to Water Management," focused OIl developing research and analysis to support tribal water resources management. The project workplan included development of a core

Fay, Noah

84

COST 526 Project CH4 Final Report  

E-Print Network [OSTI]

1 COST 526 ­ Project CH4 Final Report Modelling, Simulating and Analysing EQ-Casting and Quenching. Remark: Due to the delay of the funding of the proposed investment casting project we change the focus of the project. The development of an Open Source optimization tool (see collaboration) was a relevant

85

Reactor physics project final report  

E-Print Network [OSTI]

This is the final report in an experimental and theoretical program to develop and apply single- and few-element methods for the determination of reactor lattice parameters. The period covered by the report is January 1, ...

Driscoll, Michael J.

1970-01-01T23:59:59.000Z

86

Wind Forecast Improvement Project Southern Study Area Final Report...  

Office of Environmental Management (EM)

Wind Forecast Improvement Project Southern Study Area Final Report Wind Forecast Improvement Project Southern Study Area Final Report Wind Forecast Improvement Project Southern...

87

Energia Sierra Juarez U.S. Transmission Line Final EIS Volume 3a, part 1 of 3  

Broader source: Energy.gov (indexed) [DOE]

Energia Sierra Juarez U.S. Transmission Line Project Energia Sierra Juarez U.S. Transmission Line Project Final Environmental Impact Statement Volume 3 - Comments and Responses Document May 2012 U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Washington, DC 20585 Cooperating Agency - County of San Diego San Diego, CA DOE/EIS-0414 Energia Sierra Juarez U.S. Transmission Line Final EIS i May2012 Table of Contents VOLUME 1 FINAL ENVIRONMENTAL IMPACT STATEMENT Distribution Letter Cover Sheet Summary ................................................................................................................................................... S-1 S.1 Background and Overview ............................................................................................... S-1

88

Real-Time Grid Reliability Management PIER Final Project Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Real-Time Grid Reliability Management PIER Final Project Report Real-Time Grid Reliability Management PIER Final Project Report Title Real-Time Grid Reliability Management PIER Final Project Report Publication Type Report Year of Publication 2008 Authors Eto, Joseph H., Manu Parashar, Bernard C. Lesieutre, and Nancy J. Lewis Pagination 62 Date Published 12/2008 Publisher LBNL City Berkeley Keywords consortium for electric reliability technology solutions (certs), energy analysis and environmental impacts department Abstract The increased need to manage California's electricity grid in real time is a result of the ongoing transition from a system operated by vertically integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management - construction of new transmission lines - has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools.

89

EIS-0474: Southline Transmission Project, Arizona and New Mexico |  

Broader source: Energy.gov (indexed) [DOE]

4: Southline Transmission Project, Arizona and New Mexico 4: Southline Transmission Project, Arizona and New Mexico EIS-0474: Southline Transmission Project, Arizona and New Mexico Summary The Department of the Interior's Bureau of Land Management (BLM) and Department of Energy's Western Area Power Administration (Western) are preparing this EIS as joint lead agencies to evaluate the environmental impacts of the proposed Southline Transmission Project and address associated potential land use plan amendments. The project would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing transmission lines between the Apache and Saguaro, Arizona substations. Project website: http://www.blm.gov/nm/southline.

90

EIS-0231: Navajo Transmission Project | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31: Navajo Transmission Project 31: Navajo Transmission Project EIS-0231: Navajo Transmission Project SUMMARY This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 1, 1996 EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project

91

Green Schools Project Final Report  

SciTech Connect (OSTI)

The Alliance to Save Energy has responded to interest in the Green Schools concept from the New England states of Maine, New Hampshire and Vermont. The Alliance conducted a train-the-trainers workshop in Augusta, Maine March 17--18, 1999. This work is part of a Green Schools replication project leveraged by funds from another source, NORDAX, which contributed $80,000 to provide partial support to staff at the Maine Energy Education Project (MEEP), Vermont Energy Education Program (VEEP), and New Hampshire Governor's Office to develop Green Schools Projects. DOE funds were used to conduct training, develop a network of state and local government, business and school partners to support school efficiency activities in those three states.

Verdict, M.

2000-09-27T23:59:59.000Z

92

Final Cut Pro Starting project  

E-Print Network [OSTI]

Setup- DV-NTSC (for mini dv tape) HD- 720 or 1080 (what format did you shoot your film?) Click setup In FCP: File: Save project as (title of your movie) Save to your hard drive Desktop display File: Window and insert with/out transition Capturing only audio or only video Log and capture window Go to clip settings

Bordenstein, Seth

93

Wind Integration, Transmission, and Resource Assessment and Characterization Projects  

Broader source: Energy.gov [DOE]

This report covers the Wind and Water Power Program’s Wind Integration, Transmission, and Resource Assessment and Characterization Projects from FY 2006 to FY 2014.

94

BPA, Transmission, I-5 Corridor Reinforcement Project, August...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Administration has refined the potential transmission line route segments and substation sites for the proposed I-5 Corridor Reinforcement Project. The refinements are...

95

BPA, Transmission, I-5 Corridor Reinforcement Project Update...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

environmental impact statement (EIS) for our proposed I-5 Corridor Reinforcement Project. BPA is proposing to build a 500-kilovolt transmission line to reinforce the high-voltage...

96

BPA, Transmission, I-5 Corridor Reinforcement Project, presentation...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Project 500-kilovolt transmission New substations at - Castle Rock, Wash. - Troutdale, Ore. 70 miles apart Many route segments 17 Factors we consider Electrical needs for...

97

Wind Integration, Transmission, and Resource Assessment and Characterization Projects  

Broader source: Energy.gov [DOE]

This report covers the Wind and Water Power Technologies Office’s Wind integration, transmission, and resource assessment and characterization projects from fiscal years 2006 to 2014.

98

Mountain States Transmission Intertie (MSTI) Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

99

FINAL REPORT: RPSEA PROJECT NO.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

REPORT: REPORT: RPSEA PROJECT NO. 07121-DW1603D RICE UNIVERSITY Structural Health Monitoring System for Deepwater Risers with Vortex-induced Vibration: Nonlinear Modeling, Blind Identification Fatigue/Damage Estimation and Local Monitoring using Magnetic Flux Leakage by Chaojun Huang A Thesis Submitted in Partial Fulfillment of the Requirements for the Degree Doctor of Philosophy Approved, Thesis Committee: Satish Nagarajaiah, Chair Professor of Civil and Environmental Engineering and Mechanical Engineering and Material Science Jamie E. Padgett Assistant Professor of Civil and Environmental Engineering Andrew J. Dick Assistant Professor of Mechanical Engineering and Material Science Houston, Texas June, 2012 ABSTRACT Structural Health Monitoring System for Deepwater Risers with Vortex-induced Vibration: Nonlinear Modeling, Blind Identification Fatigue/Damage

100

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Broader source: Energy.gov (indexed) [DOE]

7: Champlain Hudson Power Express Transmission Line Project, 7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City. Public Comment Opportunities None available at this time. Documents Available for Download December 6, 2013 EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York

102

Granby Pumping Plant Switchyard - Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado: Final Environmental Impact Statement Appendices  

Broader source: Energy.gov (indexed) [DOE]

PUMPING PLANT SWITCHYARD - WINDY GAP PUMPING PLANT SWITCHYARD - WINDY GAP SUBSTATION TRANSMISSION LINE REBUILD, GRAND COUNTY, COLORADO DOE/EIS-0400 Final Environmental Impact Statement Appendices Grand County, Colorado June 2013 Appendix A EIS Scoping Report GRANBY PUMPING PLANT - WINDY GAP TRANSMISSION LINE REBUILD PROJECT ENVIRONMENTAL IMPACT STATEMENT SCOPING SUMMARY REPORT December 4, 2007

103

Northern Pass Transmission Line Project Environmental Impact Statement:  

Broader source: Energy.gov (indexed) [DOE]

Northern Pass Transmission Line Project Environmental Impact Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 DOE has changed the location of the September 26 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. On September 6, 2013, the U.S. Department of Energy (DOE) published in the Federal Register an amended Notice of Intent (NOI) to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement

104

EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer,  

Broader source: Energy.gov (indexed) [DOE]

8: Antelope Valley Station to Neset Transmission Project, 8: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND SUMMARY USDA Rural Utilities Service is preparing this EIS to evaluate the environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE's Western Area Power Administration (WAPA), a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to Western's transmission system. PUBLIC COMMENT OPPORTUNITIES No Public Comment Opportunities at this time

105

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

Oahu Wind Integration and Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50411 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada NREL Technical Monitor: David Corbus

106

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

447: Champlain Hudson Power Express Transmission Line Project, 447: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line will run from the Canadian Province of Quebec to New York City. DOE also published a notice correcting the location of the public hearing that was held on November 19, 2013. Public Comment Opportunities As of December 6, 2013 - Comment Period Extended through 1/15/14 Written comments must be received by January 15, 2014. Comments submitted

107

Cape Wind Energy Project - Final EIS  

Broader source: Energy.gov (indexed) [DOE]

0 0 Environmental Impact Statement for the Proposed Cape Wind Energy Project Nantucket Sound, Offshore of Massachusetts Final Environmental Impact Statement U.S. Department of the Interior, MMS EIS-EA, OCS Publication No. 2008-040, OCS EIS/EA MMS 2010-11 and OCS EIS/EA BOEMRE 2011-024 Adopted as DOE/EIS-0470 U.S. Department of Energy December 2012 Page 1 of 3 Lead Federal Agency: U.S. Department of Energy Title: Final Environmental Impact Statement for the Proposed Cape Wind Energy Project, Nantucket Sound, Massachusetts (Adopted), DOE/EIS-0470 Contact: For additional copies or more information on this Final Environmental Impact Statement (EIS), please contact: Mr. Todd Stribley U.S. Department of Energy Loan Programs Office, LP-10

108

Sundance Energy Project Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

DOE/EIS - 0322 DOE/EIS - 0322 Sundance Energy Project Final Environmental Impact Statement Western Area Power Administration June 2001 DOE/EIS - 0322 COVER SHEET Title: Sundance Energy Project, Pinal County, AZ, Final Environmental Impact Statement Lead Agency:U.S. Department of Energy, Western Area Power Administration For information about the Sundance Energy For general information on the DOE EIS Project contact: process, contact: Mr. John Holt, Environmental Manager Ms. Carol Borgstrom, Director Western Area Power Administration NEPA Policy and Assistance, EH-42 Desert Southwest Region U.S. Department of Energy P.O. Box 6457 1000 Independence Avenue, SW Phoenix, AZ 85005-6457 Washington, DC 20585 (602) 352-2592 (202) 586-4600 or (800) 472-2756 Fax: (602) 352-2630 E-mail: holt@wapa.gov

109

Subject: SPPR Proposed ED5 to Palo Verde Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Date: 832010 4:02 PM Subject: SPPR Proposed ED5 to Palo Verde Transmission Project VIA ELECTRONIC MAIL TO: DSWFPP@wapa.gov August 3, 2010 Mr. Darrick...

110

Subject: SPPR Proposed ED5 to Palo Verde Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Date: 832010 4:04 PM Subject: SPPR Proposed ED5 to Palo Verde Transmission Project VIA ELECTRONIC MAIL TO: DSWFPP@wapa.gov August 3, 2010 Mr. Darrick...

111

BPA, Transmission, I-5 Corridor Reinforcement Project, abbreviated...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Project 500-kilovolt transmission New substations at - Castle Rock, Wash. - Troutdale, Ore. 70 miles apart Many route segments 9 Benefits of a new line Keeps the lights...

112

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. Additional information is available at the project...

113

Energy Department, Arizona Utilities Announce Transmission Infrastructure Project Energization  

Broader source: Energy.gov [DOE]

Today, the Department of Energy’s Western Area Power Administration (Western) and a group of Arizona utilities celebrated the energizing of a new transmission infrastructure project that will serve the state’s growing electrical energy needs, attract renewable energy development to the area, and strengthen the transmission system in the Southwestern United States.

114

Eldorado Ivanpah Transmission Project | Open Energy Information  

Open Energy Info (EERE)

of all necessary local, state, and federal approvals, authorizations and permits. Data Completion Notes BLM Project website: http:www.blm.govcastenfoneedles...

115

Microsoft PowerPoint - CF-LM M2W Project Updates_final [Compatibility...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Upgrade Project (M2W Project) Project description: * Upgrade existing BPA Transmission system West of Garrison substation. Project includes upgrades at five...

116

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Broader source: Energy.gov (indexed) [DOE]

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

117

McNary-John Day Transmission Line Project Record of Decision (DOE/EIs-0332), (11/08/02)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Record of Decision Decision The Bonneville Power Administration (Bonneville) has decided to construct the proposed McNary-John Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. Bonneville has decided to implement the proposed action identified in the McNary-John Day Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0332, August 2002). The proposed action consists of building 79 miles of 500-kilovolt (kV) transmission line between Bonneville's McNary Substation and John Day Substation. As part of the proposed action, Bonneville has also decided to construct certain short-line routing alternatives identified in the Final EIS. These alternatives are the

118

Prototypical Consolidation Demonstration Project: Final report  

SciTech Connect (OSTI)

This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy`s Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG&G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG&G Idaho`s assessments of the equipment and procedures developed by NUS.

Gili, J.A.; Poston, V.K.

1993-11-01T23:59:59.000Z

119

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

120

PROJECT MANGEMENT PLAN EXAMPLES Project Closeout - Final Report Example  

Broader source: Energy.gov (indexed) [DOE]

Final Report Example Final Report Example Example 79 4.6.2.2.4.2 Closeout Reports Completion documentation will be compiled for each of the identified worksets. A final Closeout Report will be prepared for the 771/774 Closure Project when work is completed and the analytical data has been received. The report will consist of a brief description of the work that was completed, including any modifications or variations from the original decision document. The report will also include analytical results, including the results of any confirmatory sampling taken to verify completion of the action to the specific performance standards. A discussion of the quantity and characteristics of the actual wastes produced and how the wastes were stored or disposed will also be provided.

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Southwest Transmission Cooperative, Inc. Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Inc. Smart Grid Project Inc. Smart Grid Project Jump to: navigation, search Project Lead Southwest Transmission Cooperative, Inc. Country United States Headquarters Location Benson, Arizona Recovery Act Funding $32,244,485.00 Total Project Value $64,488,970.00 Coverage Area Coverage Map: Southwest Transmission Cooperative, Inc. Smart Grid Project Coordinates 31.9678611°, -110.2945174° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

122

Midwest Independent Transmission System Operator Smart Grid Project | Open  

Open Energy Info (EERE)

Operator Smart Grid Project Operator Smart Grid Project Jump to: navigation, search Project Lead Midwest Independent Transmission System Operator Country United States Headquarters Location Carmel, Indiana Additional Benefit Places Iowa, Illinois, Michigan, Minnesota, Missouri, Montana, North Dakota, Ohio, Pennsylvania, South Dakota, Wisconsin Recovery Act Funding $17,271,738.00 Total Project Value $34,543,476.00 Coverage Area Coverage Map: Midwest Independent Transmission System Operator Smart Grid Project Coordinates 39.978371°, -86.1180435° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

123

American Transmission Company LLC II Smart Grid Project | Open Energy  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead American Transmission Company LLC Country United States Headquarters Location Waukesha, Wisconsin Recovery Act Funding $11,444,180 Total Project Value $22,888,360 Coverage Area Coverage Map: American Transmission Company LLC II Smart Grid Project Coordinates 43.0116784°, -88.2314813° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

124

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

Broader source: Energy.gov (indexed) [DOE]

Phase 2 Report: Oahu Wind Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50414 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada

125

BPA, Transmission, I-5 Corridor Reinforcement Project, Project...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for this project, we have defined four route alternatives by combining route segments and substation sites. We are sharing this information with you now, because we expect to refer...

126

Northeast Oregon Hatchery Project, Final Siting Report.  

SciTech Connect (OSTI)

This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

Watson, Montgomery

1995-03-01T23:59:59.000Z

127

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

128

American Transmission Company LLC Smart Grid Project | Open Energy  

Open Energy Info (EERE)

American Transmission Company LLC American Transmission Company LLC Country United States Headquarters Location Waukesha, Wisconsin Recovery Act Funding $1,330,825.00 Total Project Value $2,661,650.00 Coverage Area Coverage Map: American Transmission Company LLC Smart Grid Project Coordinates 43.0116784°, -88.2314813° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

129

DOE/EIS-0294; Sutter Power Project Final Environmental Impact Statement, Volume I (April 1999)  

Broader source: Energy.gov (indexed) [DOE]

Sutter Power Project Final EIS Sutter Power Project Final EIS April, 1999 1 - 3 CHAPTER 1 INTRODUCTION TO THE FINAL ENVIRONMENTAL IMPACT STATEMENT 1.1 INTRODUCTION Western Area Power Administration (Western) is a power marketing administration of the U.S. Department of Energy (DOE). Western owns and operates a grid of electrical transmission lines in 15 western states, including California. The Calpine Corporation (Calpine) has requested an interconnection to Western's Keswick- Elverta/Olinda-Elverta double-circuit 230-kV transmission line to transmit electricity generated by their proposed Sutter Power Project (SPP). The SPP is a proposed 500- megawatt (MW) natural gas-fueled, combined-cycle, electric generation facility. This Final Environmental Impact Statement (EIS) can be viewed on DOE's National

130

McMinnville Area Support Transmission Project : Environmental Assessment.  

SciTech Connect (OSTI)

This document discusses a project to provide continuing reliable electrical service to the McMinnville, Oregon, area. BPA proposes to participate with the City of McMinnville Water and Light Department in constructing a new 230-kilovolt transmission line and substation. BPA has prepared an environmental assessment evaluating the proposed project. Reasons that constructing the line and substation would not cause significant environmental impact include: consistency with local land use plans, consistency of appearance with existing transmission and manufacturing facilities in the area, only slight effect on farmland, and avoidance of wetlands and other environmentally sensitive areas. A finding is included that there is no practicable alternative to locating the project within a 100-year floodplain. 1 fig.

United States. Bonneville Power Administration.

1990-01-01T23:59:59.000Z

131

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network [OSTI]

kV line is upgraded.   The Tehachapi Renewable Transmission Transmission Project and the Palo Verde/Harquahala?Devers No.  2  500 kV line 

Budhraja, Vikram

2008-01-01T23:59:59.000Z

132

Olympia-South Tacoma Reconductor Project : Final Environmental Assessment.  

SciTech Connect (OSTI)

The Bonneville Power Administration is proposing to change a 230,000-volt (230-kV) transmission line that runs between Olympia Substation and South Tacoma Switching Station, a distance of about 58 kilometers (36 miles). Under the proposal, they would restrict the line with slightly larger new wire in order to improve line safety. An Environmental Assessment (EA) was prepared to determine whether the proposal would cause any significant environmental impact. The EA was reviewed by the public in December 1995. This Final EA has revisions that address the public comments. It was found that the project would cause little overall environmental impact and a Finding of No Significant Impact has been completed.

United States. Bonneville Power Administration.

1996-06-01T23:59:59.000Z

133

Navajo Transmission Project Draft Environmental Impact Statement (DEIS)  

Broader source: Energy.gov (indexed) [DOE]

. . SUMRY INTRODUCTION Din6 Power Authority @PA), a Navajo Nation enterprise, proposes to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project ~), is currentiy planned to be in service in the year 2001 and operate for about 50 years. The preparation of an environment impact statement @IS) is required because of Federal government involvement, which includes (1) granting rights-of-way across Federrd and tribal lands and (2) certain participation by Western Area Power Administration ~estem), and agency of the U.S. Department of Energy (DOE). In accordance the National Environmental Policy Act of 1969 ~PA), Council on Environmental Quality (CEQ) regulations

134

EIS-0486: Plains & Eastern Clean Line Transmission Project  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

135

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

& SAVING ENERGY: FINAL REPORT ON INDOOR ENVIRONMENTAL QUALITY & ENERGY MONITORING IN SIXTEENPublic Interest Energy Research (PIER) Program FINAL PROJECT REPORT IMPROVING VENTILATION RELOCATABLE CLASSROOMS MAY 2012 CEC5002012075 Prepared for: California Energy Commission Prepared by

136

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT SMART GRID ROADMAP FOR RENEWABLES INTEGRATION JULY 2013 CEC5002010029 Prepared for: California Energy Commission Prepared by: California Energy Commission Dave Michel Project Manager Mike Gravely Office Manager Energy Efficiency

137

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT SMUD OFFPEAK OVERCOOLING PROJECT DECEMBER 2007 CEC5002013066 Prepared for: California Energy Commission Prepared by: Davis Energy Group #12; PREPARED BY: Primary Author(s): David Springer Davis Energy Group Davis, CA

138

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

The California Energy Commission's Geothermal Resources Development Account Geothermal Planning Projects support of geothermal resource elements, or geothermal components of energy elements, for inclusion in the localPublic Interest Energy Research (PIER) Program FINAL PROJECT REPORT STRUCTURING A DIRECT

139

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Energy Savers [EERE]

52: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville...

140

TX-100 manufacturing final project report.  

SciTech Connect (OSTI)

This report details the work completed under the TX-100 blade manufacturing portion of the Carbon-Hybrid Blade Developments: Standard and Twist-Coupled Prototype project. The TX-100 blade is a 9 meter prototype blade designed with bend-twist coupling to augment the mitigation of peak loads during normal turbine operation. This structural coupling was achieved by locating off axis carbon fiber in the outboard portion of the blade skins. The report will present the tooling selection, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. The molds used for the production of the TX-100 were originally built for the production of the CX-100 blade. The same high pressure and low pressure skin molds were used to manufacture the TX-100 skins. In order to compensate for the difference in skin thickness between the CX-100 and the TX-100, however, a new TX-100 shear web plug and mold were required. Both the blade assembly fixture and the root stud insertion fixture used for the CX-100 blades could be utilized for the TX-100 blades. A production run of seven TX-100 prototype blades was undertaken at TPI Composites during the month of October, 2004. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI Composites facility in Rhode Island, the blades were shipped to various test sites: two blades to the National Wind Technology Center at the National Renewable Energy Laboratory in Boulder, Colorado, two blades to Sandia National Laboratory in Albuquerque, New Mexico and three blades to the United States Department of Agriculture turbine field test facility in Bushland, Texas. An adapter plate was designed to allow the TX-100 blades to be installed on existing Micon 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the TX-100 blade testing at the three testing facilities.

Ashwill, Thomas D.; Berry, Derek S. (TPI Composites, Inc., Warren, RI)

2007-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Final environmental assessment: Los Reales 115 kV transmission line alternative routes  

SciTech Connect (OSTI)

The Central Arizona Project (CAP) was authorized as a part of the Colorado River Basin Project Act (Public Law 90-537) on September 30, 1968. The primary purpose of the CAP is to furnish water for agricultural, municipal, and industrial uses in central and southern Arizona, and western New Mexico. Due to its magnitude, the CAP is divided into several major features serving separate but interrelated functions. The Tucson Aqueduct Phase B pumping plants were designed and constructed to operate on a looped power system. The entire looped power system, including two switching stations and connecting 115-kv transmission lines, was identified in the FEIS and approved for construction in the Secretary of Interior's Record of Decision dated September 24, 1985. The loop begins in the vicinity of the Twin Peaks Pumping Plant -- the northernmost Phase B pumping station, at the Rattlesnake Switching Station. All of the looped power system has been constructed with the exception of the switching station and portion of transmission line proposed to be constructed in this project. Without construction of this final portion of the looped power system, the Phase B pumping plants will not be able to operate normally without negatively affecting nearby power sources. The CAP will also not be able to provide the reliability necessary for municipal water systems dependent upon CAP water. The purpose of this EA is to describe impacts that would result from relocating the Los Reales 115-kV transmission line, and possibly the switching station, originally identified in the FEIS. It should be mentioned the Department of Energy will complete a separate NEPA review.

Not Available

1989-10-01T23:59:59.000Z

142

DOE/EIS-0294; Sutter Power Project Final Environmental Impact Statement, Volume I (April 1999)  

Broader source: Energy.gov (indexed) [DOE]

COVER SHEET COVER SHEET Project Title: Sutter Power Project, Final Environmental Impact Statement Sutter County, California Federal Lead Agency: Western Area Power Administration, U.S. Department of Energy Related Actions: California Energy Commission's Certification for the Sutter Power Project Calpine Corporation's Application for Certification for the Sutter Power Project Sutter County General Plan Amendment and a Planned Development Rezone Western's Sutter Powerplant -- Interconnection Feasibility Study Technical Assistance: Foster Wheeler Environmental Corporation CH2M Hill R. W. Beck ABSTRACT Western Area Power Administration operates and maintains a high-voltage electric transmission system in California to deliver power to qualified customers. Calpine Corporation has requested that Western study

143

Transmission  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

144

Granby Pumping Plant Switchyard - Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado: Final Environmental Impact Statement Executive Summary  

Broader source: Energy.gov (indexed) [DOE]

PUMPING PLANT SWITCHYARD - WINDY GAP PUMPING PLANT SWITCHYARD - WINDY GAP SUBSTATION TRANSMISSION LINE REBUILD, GRAND COUNTY, COLORADO DOE/EIS-0400 Final Environmental Impact Statement Executive Summary Grand County, Colorado June 2013 Granby Pumping Plant-Windy Gap Substation Transmission Line Rebuild Project FEIS Executive Summary ES-1 EXECUTIVE SUMMARY Introduction Western Area Power Administration (Western), a power marketing administration within the U.S. Department of Energy (DOE), is proposing to rebuild and upgrade the Granby Pumping Plant Switchyard-Windy Gap Substation transmission line in Grand County, Colorado (Grand County). This Environmental Impact Statement (EIS) analyzes the impacts associated with the proposal to remove approximately 13.6 miles of 69-kilovolt (kV) transmission line, construct approximately

145

Zachary-Fort Lauderdale pipeline construction and conversion project: final supplement to final environmental impact statement. Docket No. CP74-192  

SciTech Connect (OSTI)

This Final Supplement to the Final Environmental Impact Statement (Final Supplement) evaluates the economic, engineering, and environmental aspects of newly developed alternatives to an abandonment/conversion project proposed by Florida Gas Transmission Company (Florida Gas). It also updates the staff's previous FEIS and studies revisions to the original proposal. Wherever possible, the staff has adopted portions of its previous FEIS in lieu of reprinting portions of that analysis which require no change. 60 references, 8 figures, 35 tables.

None

1980-05-01T23:59:59.000Z

146

EIS-0399: Final EIS for the Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line Comments/Response  

Broader source: Energy.gov (indexed) [DOE]

9 9 Final Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line VOLUME 2 COMMENT RESPONSE DOCUMENT September 2008 United States Department of Energy State of Montana Department of Environmental Quality COVER SHEET Responsible Agencies: U.S. Department of Energy (DOE) and Montana Department of Environmental Quality (DEQ) are co-lead agencies; the Bureau of Land Management (BLM), U.S. Department of the Interior, is a cooperating agency. Title: Final Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line (DOE/EIS-0399) Location: Cascade, Teton, Chouteau, Pondera, Toole, and Glacier counties, Montana. Contacts: For further information about this Final EIS, contact: Ellen Russell, Project Manager,

147

Optimized Fault Location Final Project Report  

E-Print Network [OSTI]

This report was created through support of the project entitled Integration of Substation IED Information was provided by PSERC through the project entitled "Integration of Substation IED Information into EMS Electronic Devices (IEDs) at the substation level. Beyond the traditional Supervisory Control and Data

148

DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (02/09/09)  

Broader source: Energy.gov (indexed) [DOE]

09 09 REPLY TO ATTN OF: KEC-4 SUBJECT: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332/SA-1) Mark Korsness, Project Manager, McNary-John Day Transmission Line Project Proposed Action: McNary-John Day Transmission Line - Review for significant new circumstances or information Proposed by: Bonneville Power Administration (BPA) Location: Umatilla and Sherman Counties, Oregon; Benton and Klickitat Counties, Washington. Background: In 2002, BPA completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. This line was proposed in early 2000 to

149

Final Project Report Project 10749-4.2.2.1 2007-2009  

SciTech Connect (OSTI)

This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

2009-05-11T23:59:59.000Z

150

Performance Metrics Research Project - Final Report  

SciTech Connect (OSTI)

NREL began work for DOE on this project to standardize the measurement and characterization of building energy performance. NREL's primary research objectives were to determine which performance metrics have greatest value for determining energy performance and to develop standard definitions and methods of measuring and reporting that performance.

Deru, M.; Torcellini, P.

2005-10-01T23:59:59.000Z

151

SAT-WIND project Final report  

E-Print Network [OSTI]

-2840 ISBN 87-550-3570-1 The SAT-WIND project `Winds from satellites for offshore and coastal wind energy) technologies for wind energy tools for wind resources and wind-indexing. The study area was the Danish Seas microwave polarimetric 223.3.1 History 3.3.2 Measurement principle 22 223.3.3 WindSat (passive microwave

152

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

a transport membrane condenser for recovering both energy and water from the lowgrade waste heat streams Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT ENERGY: California Energy Commission Prepared by: Gas Technology Institute #12; Prepared by: Primary Author

153

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT INTEGRATED GEOTHERMAL and the surface generation facilities in geothermal energy production. Please cite the report as follows, California Energy Commission, Geothermal Resources Development Account Program, CEC5002012006 #12;ii Table

154

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

Geothermal Fluids. California Energy Commission, PIER Renewables Research Technologies Program. CEC5002009 Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT PILOTSCALE GEOTHERMAL SILICA RECOVERY AT MAMMOTH LAKES MAY 2009 CEC5002009077 Prepared for: California

155

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

, National Energy Technology Laboratory, the Western Regional Biomass Energy Program, and Yolo CountyPublic Interest Energy Research (PIER) Program FINAL PROJECT REPORT ACCELERATED ANAEROBIC COMPOSTING FOR ENERGY GENERATION AT YOLO COUNTY CENTRAL LANDFILL MAY 2012 CEC5002012063 Prepared for

156

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

supports public interest energy research and development that will help improve the quality of life Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT ENERGY Prepared for: California Energy Commission Prepared by: San Diego State Research Foundation #12

157

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT PRODUCTION, and reliable energy services and products to the marketplace. The Energy Research and Development Division Generation · Industrial/Agricultural/Water EndUse Energy Efficiency · Renewable Energy Technologies

158

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

report, Smart Grid Information Assurance and Security Technology Assessment was prepared · Transportation Smart Grid Information Assurance and Security Technology Assessment is the final report for the Smart Grid Information Assurance and Security Technology Assessment project (Contract Number 50008027

159

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT Demonstration: California Energy Commission Prepared by: Electric Power Research Institute #12; Prepared by: Primary: California Energy Commission Jamie Patterson Contract Manager Fernando Pina Office Manager Energy Efficiency

160

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT ASSESSMENT OF LARVAL Coastal Boundary Layer Flow SEPTEMBER 2007 CEC5002013049 Prepared for: California Energy Commission Energy Commission Joe O'Hagan Contract Manager Linda Spiegel Office Manager Energy Generation Research

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT ENERGYEFFICIENT Energy Commission Prepared by: Lawrence Berkeley National Laboratory #12; PREPARED BY: Primary.lbl.gov Contract Number: 500-06-053 Prepared for: California Energy Commission Paul Roggensack Contract Manager

162

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT SAIC SOLAR DISH CONCENTRATOR WITH STIRLING ENGINE DECEMBER 2007 CEC5002013068 Prepared for: California Energy Commission: 500-00-034-15 Prepared for: California Energy Commission Hassan Mohammed Contract Manager Linda

163

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT HYBRID SOLAR LIGHTING5002013067 Prepared for: California Energy Commission Prepared by: Oakridge National Laboratory Insert-04-034-18 Prepared for: California Energy Commission Hassan Mohammed Contract Manager Linda Speigel Office Manager

164

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT AUTOMATED ROOFTOP CEC5002013042 Prepared for: California Energy Commission Prepared by: Lawrence Berkeley National Energy Commission Brad Meister Contract Manager Virginia Lew Office Manager Energy Efficiency Research

165

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT A SEASONAL DECEMBER 2011 CEC5002013035 Prepared for: California Energy Commission Prepared by: Lawrence Berkeley National Laboratory Berkeley, CA 96270 Contract Number: 500-02-004 Prepared for: California Energy

166

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT AN ASSESSMENT: California Energy Commission Prepared by: University of California, Davis #12; PREPARED BY: Primary Number: 500-01-016 Prepared for: California Energy Commission Prab Sethi Contract Manager Linda Spiegel

167

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT DEVELOPMENT OF STEAM5002013092AP Prepared for: California Energy Commission Prepared by: University of California #12 Energy Commission David Effross Contract Manager Linda Spiegel Office Manager Energy Generation Research

168

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT ENERGYEFFICIENT HIGHTECH BUILDINGS DECEMBER 2008 CEC5002013062 Prepared for: California Energy Commission Prepared by-06-053 Prepared for: California Energy Commission Paul Roggensack Contract Manager Virginia Lew Office Manager

169

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

LIGHTING CALIFORNIA'S FUTURE: MARKET CONNECTIONS Prepared for: California Energy Commission Research · Energy Systems Integration Lighting California's Future: Market Connections is one of nine Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT

170

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT DISTRIBUTED GENERATION team into areas of significant importance to commercial distributed generation sources with verylow in staff expertise and access to equipment made by owners of the distributed generators as none

171

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT Developing5002013109 Prepared for: California Energy Commission Prepared by: Growpro Inc #12; Prepared by Waimauku, New Zealand Contract Number: PIR-07-001 Prepared for: California Energy Commission Abolghasem

172

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT DEVELOPMENT Energy Commission Prepared by: Lawrence Berkeley National Laboratory #12; PREPARED BY: Primary-09-010 Prepared for: California Energy Commission Matthew Fung Contract Manager Virginia Lew Office Manager Energy

173

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT LIGHTING CALIFORNIA'S FUTURE RetrofitIntegrated Classroom Lighting System (RICLS) Prepared for: California Energy Commission Managed by: Architectural Energy Corporation Prepared by: Finelite Inc. FEBRUARY 2013 CEC

174

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT GREENGUIDE FOR SUSTAINABLE ENERGY EFFICIENT REFRIGERATED STORAGE FACILITIES MARCH 2013 CEC-500-2013-145 Prepared for: California Energy for: California Energy Commission Anish Gautam Contract Manager Virginia Lew Office Manager Energy

175

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT PRELIMINARY ESTIMATES5002013051 Prepared for: California Energy Commission Prepared by: Lawrence Berkeley National Laboratory: 500-99-013 Prepared for: California Energy Commission Steve Ghadiri Contract Manager Fernando Piña

176

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT EMISSIONS REDUCTIONS FROM RENEWABLE ENERGY AND ENERGY EFFICIENCY IN CALIFORNIA AIR QUALITY MANAGEMENT DISTRICTS DECEMBER 2011 CEC5002013047 Prepared for: California Energy Commission Prepared by: Synapse Energy

177

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT ENERGY for: California Energy Commission Prepared by: San Diego State Research Foundation #12: California Energy Commission Raquel Kravitz Program Manager Fernando Pina Office Manager Energy Systems

178

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT PLANNING ALTERNATIVE5002013021 Prepared for: California Energy Commission Prepared by: Facet Decision Systems, Inc. #12-08-030 Prepared for: California Energy Commission Linda Spiegel Contract Manager Linda Spiegel Office Manager

179

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT Technology MARCH 2013 CEC5002012077 Prepared for: California Energy Commission Prepared by: Heschong Mahone-03-026 Prepared for: California Energy Commission Kristy Chew Contract Manager Fernando Pina Office Manager Energy

180

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT COMMERCIALIZING ZERO ENERGY NEW HOME COMMUNITIES Appendices MARCH 2010 CEC5002014007AP Prepared for: California Energy SunPower Corporation Contract Number: 500-04-022 Prepared for: California Energy Commission Golam

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT ENERGY for: California Energy Commission Prepared by: San Diego State Research Foundation #12 Energy Commission Raquel E. Kravitz Program Manager Fernando Pina Office Manager Energy Systems Research

182

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT ASSESSMENT OF PIEZOELECTRIC MATERIALS FOR ROADWAY ENERGY HARVESTING Cost of Energy and Demonstration Roadmap Prepared for: California Energy Commission Prepared by: DNV KEMA Energy & Sustainability JANUARY 2014 CEC5002013007

183

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT CREATING INCENTIVES FOR ELECTRICITY PROVIDERS TO INTEGRATE DISTRIBUTED ENERGY RESOURCES NOVEMBER 2007 CEC5002008028 Prepared for: California Energy Commission Prepared by: Electric Power Research Institute (EPRI) #12; Prepared by

184

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT DEMANDCONTROLLED VENTILATION AND CLASSROOM VENTILATION SEPTEMBER 2009 CEC5002013057 Prepared for: California Energy. Sullivan Indoor Environment Group Energy Analysis and Environmental Impacts Department Lawrence Berkeley

185

Alaska Wood Biomass Energy Project Final Report  

SciTech Connect (OSTI)

The purpose of the Craig Wood Fired Boiler Project is to use waste wood from local sawmilling operations to provide heat to local public buildings, in an effort to reduce the cost of operating those buildings, and put to productive use a byproduct from the wood milling process that otherwise presents an expense to local mills. The scope of the project included the acquisition of a wood boiler and the delivery systems to feed wood fuel to it, the construction of a building to house the boiler and delivery systems, and connection of the boiler facility to three buildings that will benefit from heat generated by the boiler: the Craig Aquatic Center, the Craig Elementary School, and the Craig Middle School buildings.

Jonathan Bolling

2009-03-02T23:59:59.000Z

186

Klickitat Cogeneration Project : Final Environmental Assessment.  

SciTech Connect (OSTI)

To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

United States. Bonneville Power Administration; Klickitat Energy Partners

1994-09-01T23:59:59.000Z

187

Fuel Cell Forklift Project Final Report  

SciTech Connect (OSTI)

This project addresses the DOE’s priorities related to acquiring data from real-world fuel cell operation, eliminating non-technical barriers, and increasing opportunities for market expansion of hydrogen fuel cell technologies. The project involves replacing the batteries in a complete fleet of class-1 electric lift trucks at FedEx Freight’s Springfield, MO parcel distribution center with 35 Plug Power GenDrive fuel cell power units. Fuel for the power units involves on-site hydrogen handling and dispensing equipment and liquid hydrogen delivery by Air Products. The project builds on FedEx Freight’s previous field trial experience with a handful of Plug Power’s GenDrive power units. Those trials demonstrated productivity gains and improved performance compared to battery-powered lift trucks. Full lift truck conversion at our Springfield location allows us to improve the competitiveness of our operations and helps the environment by reducing greenhouse gas emissions and toxic battery material use. Success at this distribution center may lead to further fleet conversions at some of our distribution centers.

Cummings, Clifton C

2013-10-23T23:59:59.000Z

188

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT INTEGRATING BIOENERGETICS, SPACIAL for patiently assisting us with budget and final report submission. i #12;PREFACE The California Energy for: California Energy Commission Prepared by: University of California, Santa Barbara #12;PREPARED BY

189

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT NATURAL GAS OPTIMIZED ADVANCED HEAVY · Environmentally Preferred Advanced Generation · Industrial/Agricultural/Water End-Use Energy Efficiency · Renewable Energy Technologies · Transportation Natural Gas-optimized Advanced Heavy-duty Engine is the final

190

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT Integrated CHP Using UltraLow NOx Supplemental Firing MARCH 2013 CEC5002013043 Prepared for: California Energy://www.gastechnology.org Contract Number: PNG-07-006 Prepared for: California Energy Commission Gail Wiggett Project Manager Linda

191

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT GEOTHERMAL EXPLORATION of a significant financial contribution to the project, at no cost to the Califor nia Energy Commission cation of ASTER scenes, at no cost to the Commission. Mark Coolbaugh (Great Basin Center for Geothermal

192

Final Report: Fan Filter Unit Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

61684 61684 Demonstration of Advanced Filtration Technologies: Developing Energy-rebate Criteria through Performing Standard Laboratory Tests and Statistical Analyses Final Report (LBNL- 61684) To California Energy Commission 2007 Tengfang Xu and Duo Wang 2 Disclaimer This document was prepared as an account of work sponsored by the United States Government and California Energy Commission. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor California Energy Commission, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or

193

Physics of Correlated Systems, Final Project Report  

SciTech Connect (OSTI)

The funding of this DOE project has enabled the P.I. and his collaborators to tackle a number of problems involving nonperturbatively coupled atomic systems, including their interactions with each other and/or with an external electromagnetic field of the type provided by either a continuous-wave or a femtosecond short-pulse laser. The progress includes a new, deeper understanding of an old and famous theory of autoionization lineshapes, developed initially by Ugo Fano in 1935 and later extended in a highly cited 1961 article; the new result specifically is that in a collaboration with the Heidelberg group we have been able to demonstrate an unexpectedly simple behavior in the time domain that is relevant for modern short-pulse lasers. This study also demonstrates a way to modify and even control the lineshapes of unstable atomic and molecular energy levels.

Greene, Chris H. [University of Colorado at Boulder] [University of Colorado at Boulder

2014-06-25T23:59:59.000Z

194

Yakima Fisheries Project : Final Environmental Impact Statement.  

SciTech Connect (OSTI)

BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

1996-01-01T23:59:59.000Z

195

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Broader source: Energy.gov (indexed) [DOE]

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

196

Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project  

Broader source: Energy.gov (indexed) [DOE]

Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project file:///I|/Data%20Migration%20Task/EIS-0230-FEIS-1995/01_EIS0230_rcp.html[6/27/2011 1:26:50 PM] Resource Contingency Program-Oregon Final Environmental Impact Statement Hermiston Power Project Introduction The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by

197

Baltimore Zoo digester project. Final report. [Elephants  

SciTech Connect (OSTI)

The results of a project to produce methane using the manure from zoo animals as a feedstock is presented. Two digesters are in operation, the first (built in 1974) utilizing wastes from the Hippo House and a second (built in 1980) utilizing wastes from the Elephant House. Demonstrations on the utilization of the gas were performed during zoo exhibits. The Elephant House Digester has a capacity of 4200 gallons and a floating gas dome which can retain at least 150 cu ft of gas. Solar energy has been incorporated into the design to maintain digester temperature at 95/sup 0/F. The system produces 50 cu ft per day. After cleaning the gas, it is used to generate electricity to power an electric light, a roof fan, and an air conditioner. The gas is also used to operate a gas range and a gas lamp. During the opening day exhibit, 50 meals were cooked using the bio-gas from just 2 elephants. (DMC)

Gibson, P.W.

1980-01-01T23:59:59.000Z

198

Innovative subsurface stabilization project -- Final Report  

SciTech Connect (OSTI)

This is a report of results of applying four innovative grouting materials and one commercially available material for creating monoliths out of buried waste sites using jet grouting. The four innovative materials included a proprietary water-based epoxy, an Idaho National Engineering Laboratory-developed two-component grout that resembles hematite when cured with soil, molten low-temperature paraffin, and a proprietary iron oxide cement-based grout called TECT. The commercial grout was Type-H high-sulfate-resistant cement. These materials were tested in specially designed cold test pits that simulate buried transuranic waste at the Idaho National Engineering Laboratory. In addition to the grouting studies, specially designed field-scale permeameters were constructed to perform full-scale controlled mass balance hydraulic conductivity studies. An ungrouted field-scale permeameter contained simulated buried waste and soil and was left ungrouted, and a second identical field-scale permeameter was grouted with commercial-grade Type-H cement. The field demonstrations were performed in an area referred to as the Cold Test Pit at the Idaho National Engineering Laboratory. The Cold Test Pit is adjacent to the laboratory`s Radioactive Waste Management Complex. At the complex, 2 million ft{sup 3} of transuranic waste is commingled with 6--8 million ft{sup 3} of soil in shallow land burial, and improving the confinement of this waste is one of the options for final waste disposition. This report gives results of grouting, coring, hydraulic conductivity, and destructive examination of the grouted buried waste matrix.

Loomis, G.G.; Zdinak, A.P.; Bishop, C.W.

1996-11-01T23:59:59.000Z

199

Colorado Better Buildings Project Final Report  

SciTech Connect (OSTI)

The Colorado Better Buildings project intended to bring new and existing energy efficiency model programs to market with regional collaboration and funding partnerships. The goals for Boulder County and its program partners were to advance energy efficiency investments, stimulate economic growth in Colorado and advance the state’s energy independence. Collectively, three counties set out to complete 9,025 energy efficiency upgrades in 2.5 years and they succeeded in doing so. Energy efficiency upgrades have been completed in more than 11,000 homes and businesses in these communities. Boulder County and its partners received a $25 million BetterBuildings grant from the U.S. Department of Energy under the American Recovery and Reinvestment Act in the summer of 2010. This was also known as the Energy Efficiency and Conservation Block Grants program. With this funding, Boulder County, the City and County of Denver, and Garfield County set out to design programs for the residential and commercial sectors to overcome key barriers in the energy upgrade process. Since January 2011, these communities have paired homeowners and business owners with an Energy Advisor – an expert to help move from assessment to upgrade with minimal hassle. Pairing this step-by-step assistance with financing incentives has effectively addressed many key barriers, resulting in energy efficiency improvements and happy customers. An expert energy advisor guides the building owner through every step of the process, coordinating the energy assessment, interpreting results for a customized action plan, providing a list of contractors, and finding and applying for all available rebates and low-interest loans. In addition to the expert advising and financial incentives, the programs also included elements of social marketing, technical assistance, workforce development and contractor trainings, project monitoring and verification, and a cloud-based customer data system to coordinate among field advisors and across local governments and local service vendors. A portion of the BetterBuildings grant went to the Metro Mayors Caucus (MMC) who worked in partnership with the Denver Regional Council of Governments (DRCOG) to conduct a series of 10 energy efficiency workshops for local government officials and other interested parties. The workshops helped showcase lessons learned on energy efficiency and helped guide other local governments in the establishment of similar programs. The workshops covered a wide range of energy efficiency and renewable energy topics such as clean energy finance, social mobilization and communications, specific case studies of Colorado towns, energy efficiency codes, net zero buildings and solar power. Since the programs launched in January 2011, these communities have collectively spurred economic investments in energy efficiency, achieved greater than 5:1 leveraging of grant funds, saved energy and reduced greenhouse gas emissions, provided trainings for a robust local energy contractor network, and proved out viable and replicable program models that local utilities and other communities are adopting, with long lasting market transformation.

Strife, Susie; Yancey, Lea

2013-12-30T23:59:59.000Z

200

Energy Department Finalizes Loan Guarantee for Ormat Geothermal Project in  

Broader source: Energy.gov (indexed) [DOE]

Ormat Geothermal Ormat Geothermal Project in Nevada Energy Department Finalizes Loan Guarantee for Ormat Geothermal Project in Nevada September 23, 2011 - 3:37pm Addthis Washington, D.C. - U.S. Energy Secretary Steven Chu today announced the Department finalized a partial guarantee for up to a $350 million loan to support a geothermal power generation project. The project, sponsored by Ormat Nevada, Inc., is expected to produce up to 113 megawatts (MW) of clean, baseload power from three geothermal power facilities and will increase geothermal power production in Nevada by nearly 25 percent. The facilities are Jersey Valley in Pershing County, McGinness Hills in Lander County and Tuscarora in Elko County. The company estimates the project will fund 332 jobs during construction and 64 during operations.

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Final Report on Grand Challenge LDRD Project:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SAND 2004-2365 SAND 2004-2365 UNLIMITED RELEASE PRINTED MAY 2004 F F i i n n a a l l R R e e p p o o r r t t o o n n G G r r a a n n d d C C h h a a l l l l e e n n g g e e L L D D R R D D P P r r o o j j e e c c t t : : A A R R e e v v o o l l u u t t i i o o n n i i n n L L i i g g h h t t i i n n g g - - B B u u i i l l d d i i n n g g t t h h e e S S c c i i e e n n c c e e a a n n d d T T e e c c h h n n o o l l o o g g y y B B a a s s e e f f o o r r U U l l t t r r a a - - E E f f f f i i c c i i e e n n t t S S o o l l i i d d - - S S t t a a t t e e L L i i g g h h t t i i n n g g Solid-State Lighting GCLDRD Final Report Page 3 of 151 J. A. Simmons, J. Y. Tsao, S. R. Kurtz, T. M. Bauer, R. J. Kaplar, W. W. Chow, E. D. Jones, K. E. Waldrip, S. R. Lee, A. J. Fischer, M. H. Crawford, K. W. Fullmer, and B. L. Abrams Semiconductor Material and Device Sciences Department R. M. Biefeld, D. D. Koleske, A. A. Allerman, J. J. Figiel, R. J. Creighton, M. E. Coltrin,

202

Final Report Limited Soil Investigation of Project Chariot Test Holes  

Office of Legacy Management (LM)

Limited Soil Investigation of Project Limited Soil Investigation of Project Chariot Test Holes Cape Thompson, Alaska December 2010 Prepared for U.S. Department of Energy and U.S. Army Corps of Engineers, Alaska District Post Office Box 6898 Elmendorf AFB, Alaska 99506-6898 Contract W911KB-08-D-0003 Task Order 12, Mod 001 Prepared by Fairbanks Environmental Services 3538 International Street Fairbanks, Alaska 99701 (907) 452-1006 FES Project No. 5012-06 Final Report Limited Soil Investigation of Project Chariot Test Holes, Cape Thompson, Alaska Fairbanks Environmental Services 5012-06 TABLE OF CONTENTS Page Number EXECUTIVE SUMMARY 1.0 INTRODUCTION ................................................................................................... 1-1

203

EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

204

High Performance Building Facade Solutions: PIER Final Project Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

High Performance Building Facade Solutions: PIER Final Project Report High Performance Building Facade Solutions: PIER Final Project Report Title High Performance Building Facade Solutions: PIER Final Project Report Publication Type Report LBNL Report Number LBNL-4583E Year of Publication 2009 Authors Lee, Eleanor S., Stephen E. Selkowitz, Dennis L. DiBartolomeo, Joseph H. Klems, Robert D. Clear, Kyle Konis, Robert J. Hitchcock, Mehry Yazdanian, Robin Mitchell, and Maria Konstantoglou Date Published 12/2009 Abstract Building façades directly influence heating and cooling loads and indirectly influence lighting loads when daylighting is considered, and are therefore a major determinant of annual energy use and peak electric demand. façades also significantly influence occupant comfort and satisfaction, making the design optimization challenge more complex than many other building systems.

205

Coordination of Transmission Line Transfer Capabilities  

E-Print Network [OSTI]

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

206

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in  

Broader source: Energy.gov (indexed) [DOE]

4: Montana-to-Washington Transmission System Upgrade Project 4: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana SUMMARY This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations. The project website is http://efw.bpa.gov/environmental_services/Document_Library/M2W/. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVALABLE FOR DOWNLOAD May 3, 2012 EIS-0484: Notice of Intent to Prepare an Environmental Impact Statement

207

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

208

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in  

Broader source: Energy.gov (indexed) [DOE]

0: TransWest Express 600 kV Direct Current Transmission 0: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada Summary This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. Public Comment Opportunities

209

EIS-0317: Kangley-Echo Lake Transmission Line Project  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

210

BPA, transmission, I-5 Corridor Reinforcement Project, new Permission...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

also identify protective measures that BPA would take during the construction process if BPA decides to build a transmission line or substation. An archeologist or historian may...

211

BPA transmission, I-5 corridor reinforcement project, updated...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities Proposed New Substation sde.SDE.BPAPlannedTlines sde.SDE.BPAPlannedTlines BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

212

BPA Transmission, I-5 Corridor Reinforcement Project, Scoping...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the transmission lines and consider energy efficiency strategies. Commenters also asked BPA to consider whether a new substation will be needed half-way between Troutdale and...

213

BPA, Transmission, I-5 Corridor Reinforcement Project Map, August...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

lettered route segments added for consideration Segments no longer being considered 5 K BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

214

BPA, proposed I-5 Corridor Reinforcement transmission project...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Regional GIS Database, 2009. Facilities Proposed New Substation Proposed Route Segments BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

215

EIS-0106: Final Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

106: Final Environmental Impact Statement EIS-0106: Final Environmental Impact Statement Great Falls-Conrad Transmission Line Project, Montana EIS-0106: Final Environmental Impact...

216

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT COMMERCE ENERGY BIOGAS/PV MINIGRID Wheless, Los Angeles Sanitation District Mr. V. John White, Center for Energy Efficiency and Renewable Authority Mr. Robert Ooten, Orange County Sanitation District ii #12;PREFACE The California Energy

217

Real Time PMU-Based Stability Monitoring Final Project Report  

E-Print Network [OSTI]

Real Time PMU-Based Stability Monitoring Final Project Report Power Systems Engineering Research@eecs.wsu.edu Phone: 509-335-1150 Power Systems Engineering Research Center The Power Systems Engineering Research Center (PSERC) is a multi-university Center conducting research on challenges facing the electric power

218

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT WATER HEATING DESIGN GUIDE DECEMBER · Renewable Energy Technologies · Transportation Water Heating Design Guide is an interim report, prepared · Energy Innovations Small Grants · Energy-Related Environmental Research · Energy Systems Integration

219

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

, and UC Davis student volunteers. For the UC Davis contingent, we thank Andy Bookter for serving as leadEnergy Research and Development Division FINAL PROJECT REPORT 21st CENTURY INSTREAM FLOW ASSESSMENT FRAMEWORK FOR MOUNTAIN STREAMS MARCH 2011 CEC5002013059 Prepared for: California Energy

220

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

Perez Clean Power Research Napa, California 94558 and Albany, New York 12203 Contract Number: 500Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT UTILITY SYSTEM CAPACITY AND CUSTOMER DEMAND VALUE OF PHOTOVOLTAIC Prepared for: California Energy Commission Prepared by: Clean

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

in their areas of expertise. Dr. Ruth Yanai (State University of New York, College of Environmental SciencePublic Interest Energy Research (PIER) Program FINAL PROJECT REPORT POTENTIAL POSITIVE Energy Commission Prepared by: William Stewart, Robert F. Powers, Kathyrn McGown, Lindsay Chiono

222

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

VALIDATION OF A 25 KILOWATT DUAL SHELL STIRLING ENGINE APRIL 2009 CEC5002009061 Prepared for: California · Transportation Proof of Concept and Test Validation of a 25 kW Dualshell Stirling Engine final report for the 25kW Dualshell Stirling Engine Project (Contract Number 50004017) conducted by ADI Thermal Power

223

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT NOVEMBER 2010 CEC5002013048 Prepared for: California Energy Commission Prepared by: California Biomass Collaborative BIOFUELS as the result of work sponsored by the California Energy Commission. It does not necessarily represent the views

224

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT AN ECONOMIC ANALYSIS OF SIX DAIRY DIGESTER SYSTEMS IN CALIFORNIA Volume 2 MARCH 2013 CEC-500-2014-001-V2 Prepared for: California Energy: California Energy Commission Abolghasem Edalati Contract Manager Linda Spiegel Office Manager Energy

225

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT CALIFORNIA AUTONOMOUS UNMANNED AERIAL VEHICLE AIR POLLUTION PROFILING STUDY DECEMBER 2009 CEC-500-2011-039 Prepared for: California Energy-07-014 Prepared for: California Energy Commission Guido Franco Contract Manager Linda Spiegel Office Manager

226

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT NEW ENGINE TECHNOLOGY FOR CALIFORNIA'S COMBINED HEAT AND POWER MARKET MARCH 2013 CEC-500-2013-119 Prepared for: California Energy Commission Waltham, MA 02451 781-466-6431 www.tecogen.com Contract Number: PIR-08-022 Prepared for: California Energy

227

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT LIFE-CYCLE ASSESSMENT AND URBAN SUSTAINABILITY OCTOBER 2010 CEC-500-2013-129 Prepared for: California Energy Commission Prepared by: University for: California Energy Commission Erik Stokes Contract Manager Linda Spiegel Office Manager Energy

228

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT DEVELOPMENT OF STEAM for: California Energy Commission Prepared by: University of California #12; PREPARED BY: Primary-781-5791 951-781-5790 (fax) Contract Number: 500-09-008 Prepared for: California Energy Commission David

229

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT REDUCTIONS IN URBAN OUTDOOR WATER USE-2013-152 Prepared for: California Energy Commission Prepared by: University of California #12;PREPARED BY: Primary of California, Los Angeles Contract Number: PIR-08-005 Prepared for: California Energy Commission Joseph O

230

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT COMPENSATION CEC5002013114 Prepared for: California Energy Commission Prepared by: Stratus Consulting Inc. #12-04-025 Prepared for: California Energy Commission Joe O'Hagan Contract Manager Linda Spiegel Office Manager Energy

231

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT THE ICHTHYOPLANKTON OF KING HARBOR, REDONDO BEACH, CALIFORNIA 19742006 APRIL 2008 CEC5002013053 Prepared for: California Energy Angeles, CA 90041 Contract Number: 500-04-025 Prepared for: California Energy Commission Joseph O

232

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT THE VALUE OF NATURAL GAS STORAGE-2013-131 Prepared for: California Energy Commission Prepared by: ICF International #12;PREPARED BY: Primary Author: California Energy Commission David Michel Contract Manager Fernando Pina Office Manager Energy Systems

233

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT Production of Substituted Natural 2012 CEC5002013104 Prepared for: California Energy Commission Prepared by: University of California-781-5791 951-781-5790 (fax) www.ucr.edu Contract Number: 500-11-004 Prepared for: California Energy Commission

234

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT EVALUATION OF NUMERICAL WEATHER PREDICTION FOR SOLAR FORECASTING Prepared for: California Energy Commission Prepared by: California Solar Energy Collaborative University of California, San Diego APRIL 2012 CEC-500-2013-115 #12;PRIMARY AUTHOR

235

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT ADVANCED CHARACTERIZATION OF WIND RESOURCES IN SELECTED FOCUS AREAS OF CALIFORNIA Prepared for: California Energy Commission Prepared by: AWS-06-024 Prepared for: California Energy Commission Mike Kane Contract Manager Linda Spiegel Office Manager Energy

236

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT DEMONSTRATION OF ADVANCED-2013-147 Prepared for: California Energy Commission Prepared by: Electric Power Group, LLC #12;PREPARED BY: Primary: California Energy Commission Jamie Patterson Contract Manager Fernando Pina Office Manager Energy Systems

237

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT LIFECYCLE ENERGY: California Energy Commission Prepared by: University of California, Berkeley Department of Civil-1712 510-642-7300 Contract Number: 500-02-004 Work Authorization MR-048 Prepared for: California Energy

238

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT ENERGY INNOVATIONS: California Energy Commission Prepared by: San Diego State Research Foundation #12; Prepared by: Primary Diego, CA 92182-1858 (619) 594-1900 Contract Number: 500-98-014 Prepared for: California Energy

239

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT SUMMARY OF RECENT WIND INTEGRATION STUDIES Experience from 2007-2010 APRIL 2012 CEC-500-2013-124 Prepared for: California Energy Commission Prepared by: California Wind Energy Collaborative #12;PRIMARY AUTHOR(S): Phillip de Mello C.P. (Case) van

240

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT ENERGY REDUCTION IN MEMBRANE-2013-132 Prepared for: California Energy Commission Prepared by: University of California, Irvine and Kennedy Main Street, Suite 140 Irvine, CA 92614 Contract Number: MRA-02-082 Prepared for: California Energy

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT DRILLING AND TESTING5002013083AP Prepared for: California Energy Commission Prepared by: Layman Energy Associates, Inc. #12; PREPARED BY: Primary Author(s): Erik B. Layman Layman Energy Associates, Inc. 1584 Cordova Drive San Luis

242

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT RANKING AND PRIORITIZING THE DEPLOYMENT OF COMMUNITY- SCALE ENERGY MEASURES BASED ON THEIR INDIRECT EFFECTS IN CALIFORNIA'S CLIMATE ZONES MARCH 2013 CEC-500-2013-122 ALTOSTRATUS Prepared for: California Energy Commission Prepared by

243

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT DRILLING AND TESTING Prepared for: California Energy Commission Prepared by: Layman Energy Associates, Inc. #12; PREPARED BY: Primary Author(s): Erik B. Layman Layman Energy Associates, Inc. 1584 Cordova Drive San Luis

244

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT LOW­COST, ENERGY­SAVING, SOLID STATE SMART WINDOWS AUGUST 2012 CEC5002013026 Prepared for: California Energy Commission Number: PIR-10-049 Prepared for: California Energy Commission Dustin Davis Contract Manager Virginia Lew

245

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT ENERGY INNOVATIONS: California Energy Commission Prepared by: San Diego State Research Foundation #12; Prepared by: Primary-1858 (619) 594-1900 Contract Number: 500-98-014 Prepared for: California Energy Commission Raquel E. Kravitz

246

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT TECHNICAL BRIEFS: California Energy Commission Prepared by: E SOURCE #12; PREPARED BY: Primary Author(s): Ira Krepchin-03-005 Prepared for: California Energy Commission David Weightman Contract Manager Virginia Lew Office Manager

247

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT PILOT PHASE OF A FIELD STUDY TO DETERMINE WASTE OF WATER AND ENERGY IN RESIDENTIAL HOT WATER DISTRIBUTION SYSTEMS JULY 2009 CEC-500-2013-135 Prepared for: California Energy Commission Prepared by: Lawrence Berkeley National Laboratory #12;PREPARED

248

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT COMMERCIALIZING ZERO ENERGY NEW HOME COMMUNITIES MARCH 2010 CEC-500-2014-007 Prepared for: California Energy Commission Prepared by: Sun: 500-04-022 Prepared for: California Energy Commission Golam Kibrya Contract Manager Linda Spiegel

249

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT ADVANCED POWER ELECTRONICS INTERFACE-2014-006 Prepared for: California Energy Commission Prepared by: National Renewable Energy Laboratory #12;PREPARED Harrison National Renewable Energy Laboratory 15013 Denver West Parkway Golden, CO 80401 Contract Number

250

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT DEVELOPMENT OF NEW TESTING PROTOCOLS FOR MEASURING THE PERFORMANCE OF SHOWERHEADS MARCH 2010 CEC-500-2013-130 Prepared for: California Energy: California Energy Commission Brad Meister Contract Manager Virginia Lew Office Manager Energy Efficiency

251

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT ENERGY AND ENVIRONMENTAL PERFORMANCE: California Energy Commission Prepared by: Summers Consulting, LLC #12;PREPARED BY: Primary Author(s): Matthew-041 Prepared for: California Energy Commission Abolghasem Edalati Contract Manager Linda Spiegel Office Manager

252

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT POTENTIAL TARGETS AND BENEFITS FOR URBAN ENERGY SYSTEMS RESEARCH MAY 2009 CEC-500-2010-009 Prepared for: California Energy Commission Institute of the Environment Los Angeles, CA Contract Number: BOA-99-207-P Prepared for: California Energy

253

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT STANDARDS, RULES, AND ISSUES FOR INTEGRATION OF RENEWABLE RESOURCES SEPTEMBER 2010 CEC-500-2013-149 Prepared for: California Energy Commission for: California Energy Commission Steve Ghadiri Contract Manager Fernando Pina Office Manager Energy

254

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT EVALUATION OF EXISTING This report was prepared as the result of work sponsored by the California Energy Commission. It does: California Energy Commission Prepared by: Lawrence Berkeley National Laboratory #12;Prepared by: Primary

255

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division FINAL PROJECT REPORT INTEGRATING BUILDING COMMISSIONING DISCLAIMER This report was prepared as the result of work sponsored by the California Energy Commission rights. This report has not been approved or disapproved by the California Energy Commission nor has

256

EIS-0124: Conrad-Shelby Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

257

EIS-0101: Thermopolis, Alcova, Casper Transmission Line Project  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this statement to evaluate the environmental impacts of constructing, operating and maintaining a 230-kilovolt transmission line between Thermopolis, Wyoming, and Alcova, Wyoming, and a 230/345-kilovolt transmission line between Alcova, Wyoming, and Casper, Wyoming.

258

EIS-0499: Great Northern Transmission Line Project, Minnesota  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 750-megawatt electric transmission system across the U.S.-Canada border. The proposed 220 mile transmission line would cross the border near Roseau, Minnesota, and continue to Grand Rapids, Minnesota.

259

DOE/EA-1644: Kildeer to Mountain Transmission Project Pre-Decisional Environmental Assessment (May 2009)  

Broader source: Energy.gov (indexed) [DOE]

KILLDEER TO MOUNTAIN KILLDEER TO MOUNTAIN TRANSMISSION PROJECT PRE-DECISIONAL ENVIRONMENTAL ASSESSMENT MAY 5, 2009 DOE/EA-1644 PRE-DECISIONAL ENVIRONMENTAL ASSESSMENT KILLDEER TO MOUNTAIN PAGE i MAY 2009 TRANSMISSION PROJECT DOE/EA -1644 TABLE OF CONTENTS 1.0 INTRODUCTION .............................................................................................. 1-1 1.1 Purpose of and Need for Action ........................................................................................... 1-1 1.1.1 Project Purpose ............................................................................................................ 1-1 1.1.2 Western's Purpose and Need ..................................................................................... 1-1

260

Nome, Alaska, Wind Turbine Demonstration Project Final Environmental Assessment and  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment and Final Environmental Assessment and Finding of No Significant Impact November 2000 Prepared for: U.S. Department of Energy Golden Field Office 1617 Cole Blvd. Golden, CO 80401 Prepared by: Battelle Memorial Institute 505 King Avenue Columbus, OH 43201 Nome, Alaska, Wind Turbine Demonstration Project Finding of No Significant Impact Nome, Alaska, Wind Turbine Demonstration Project FINDING OF NO SIGNIFICANT IMPACT S U M M A R Y The U.S. Department of Energy (DOE) has prepared this Environmental Assessment (EA) to provide DOE and other public agency decision makers witb tbe environmental documentation required to take informed discretionary action on the proposed Nome, Alaska, Wind Turbine Demonstration Project (DOE/EA-1280). The EA assesses the potential environmental impacts and cumulative i

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

West Valley Demonstration Project Waste Management Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

WEST VALLEY DEMONSTRATION PROJECT WEST VALLEY DEMONSTRATION PROJECT WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FINAL SUMMARY December 2003 Prepared by: U.S. Department of Energy West Valley Area Office West Valley, NY DOE/EIS - 0337F For general questions or to request a copy of this EIS, please contact: DANIEL W. SULLIVAN, DOCUMENT MANAGER DOE WEST VALLEY AREA OFFICE 10282 Rock Springs Road WEST VALLEY, NY 14171-0191 1-800-633-5280 COVER SHEET Lead Agency: U.S. Department of Energy Title: Final West Valley Demonstration Project Waste Management Environmental Impact Statement, Cattaraugus County, West Valley, New York. Contact: For further information about this Environmental Impact Statement, contact: For general information on the Department of Energy's process for implementing the National

262

EIS-0496: San Luis Transmission Project, Alameda, Merced, San Joaquin and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

96: San Luis Transmission Project, Alameda, Merced, San 96: San Luis Transmission Project, Alameda, Merced, San Joaquin and Stanislaus Counties, California EIS-0496: San Luis Transmission Project, Alameda, Merced, San Joaquin and Stanislaus Counties, California Summary DOE's Western Area Power Administration, with the Bureau of Reclamation as a cooperating agency, is preparing a joint EIS and environmental impact report (under the California Environmental Quality Act) to evaluate the potential environmental impacts of the proposed interconnection of certain San Luis Unit facilities to Western's Central Valley Project Transmission System. Western proposes at a minimum to construct, own, operate, and maintain a new 230-kilovolt (kV) transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a

263

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |  

Broader source: Energy.gov (indexed) [DOE]

80: Big Bend to Witten Transmission Line Project, South Dakota 80: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with DOE's Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download April 12, 2011

264

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

265

Microsoft PowerPoint - FY12 RMR - CRSP TRANSMISSION PLANNING MEETING_Final.PPT [Compatibility Mode]  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

TRANSMISSION TRANSMISSION PLANNING MEETING PLANNING MEETING December 6, 2011 December 6, 2011 1 Agenda g Introductions CRSP North (Loveland) Program CRSP South (Phoenix) Program CRSP South (Phoenix) Program Open Forum 2 CRSP North (Loveland) ( ) Capital Program Transmission Lines Substations Communications Communications Control, Protection and Metering M bil & H E i t Mobile & Heavy Equipment Programmatic Improvements 3 Transmission Lines Line Equipment Replacements 50k in FY12 & every year after Pleasant View 24.9-kV Line Replacement Estimated Project Cost (EPC) $ 1,000k FY15 $200K FY16 $800K 4 Substations Annual Equipment Replacement Program Substation Test Equipment Combined all test equipment categories under movable property, "Test Equipment Replacements"

266

EIS-0451: Hooper Springs Transmission Project, Caribou County, Idaho  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) is preparing an EIS to assess the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line that would extend from BPA's proposed Hooper Springs Substation near Soda Springs, Idaho, to either an existing Lower Valley Energy (LVE) substation or a proposed BPA connection facility that would connect with LVE's existing transmission system in northeastern Caribou County. The proposed new transmission line would be about 22 to 33 miles depending on the route alternative or option.

267

EIS-0486: Plains & Eastern Clean Line Transmission Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

86: Plains & Eastern Clean Line Transmission Project 86: Plains & Eastern Clean Line Transmission Project EIS-0486: Plains & Eastern Clean Line Transmission Project SUMMARY This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA). PUBLIC COMMENT OPPORTUNITIES None available at this time.

268

BPA, transmission, I-5 Corridor Reinforcement Project, letter...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

made to the PEP form and how they affect any rights you may or have granted. Background - BPA is proposing to build a 500-kilovolt transmission line and associated substations. The...

269

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

270

EIS-0106: Great Falls-Conrad Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

271

EIS-0496: San Luis Transmission Project, Alameda, Merced, San...  

Energy Savers [EERE]

proposes at a minimum to construct, own, operate, and maintain a new 230-kilovolt (kV) transmission line about 62 miles in length between Western's Tracy Substation and...

272

SciTech Connect: Project Final Report: HPC-Colony II  

Office of Scientific and Technical Information (OSTI)

Project Final Report: HPC-Colony II Citation Details In-Document Search Title: Project Final Report: HPC-Colony II This report recounts the HPC Colony II Project which was a...

273

BPA, Transmission, I-5 Corridor Reinforcement Project, meeting...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPA I-5 Corridor Reinforcement Project - AugustSeptember 2010 Open Houses Page 1 of 4 Meeting Summary and Survey Results BPA I-5 Corridor Reinforcement Project - AugustSeptember...

274

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

SciTech Connect (OSTI)

This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

Woodford, D.

2011-02-01T23:59:59.000Z

275

Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management approach that fosters low-growing plant communities.

N /A

2000-06-23T23:59:59.000Z

276

MIT LMFBR blanket research project. Final summary report  

SciTech Connect (OSTI)

This is a final summary report on an experimental and analytical program for the investigation of LMFBR blanket characteristics carried out at MIT in the period 1969 to 1983. During this span of time, work was carried out on a wide range of subtasks, ranging from neutronic and photonic measurements in mockups of blankets using the Blanket Test Facility at the MIT Research Reactor, to analytic/numerical investigations of blanket design and economics. The main function of this report is to serve as a resource document which will permit ready reference to the more detailed topical reports and theses issued over the years on the various aspects of project activities. In addition, one aspect of work completed during the final year of the project, on doubly-heterogeneous blanket configurations, is documented for the record.

Driscoll, M.J.

1983-08-01T23:59:59.000Z

277

Data Collection for the Bonneville Power Administration Project on Wind Loading of Transmission Conductors  

Science Journals Connector (OSTI)

ABSTRACT The Bonneville Power Administration (BPA) project, “Wind Effects on Conductors for Span Factors” was established to determine the relationship between actual and theoretical wind loads on overhead transmission conductors. This study aims to improve BPA transmission line design methods and criteria as they relate to wind conditions in the Pacific Northwest. For the past seven years, BPA has collected data from seven sites in the Pacific Northwest. Measurements of wind speeds and directions, ambient temperatures and barometric pressures, and conductor swing angles enable engineers to compare measured wind loads on conductors to theoretical values. Impact of such variables as height of conductor, span lengths and conductor diameter are also investigated. Three sites were instrumented with vertically arranged anemometers to measure wind speed as a function of height above ground. This paper covers site determination, instrumentation, data collection, and some site maintenance and operation challenges. The maintenance and manipulation of the very large data base that has been collected is discussed. As data analysis is not yet finished, final results are not included.

H.W. VOLPE

1987-01-01T23:59:59.000Z

278

Shawmut hydroelectric redevelopment project. Final technical and construction cost report  

SciTech Connect (OSTI)

This report describes the major steps undertaken by the Central Maine Power Company to redevelop an old existing lowhead (19 to 23 ft) hydroelectric station and, at the same time, demonstrate the commercial viability of such a venture. The report addresses the process of site selection, preliminary conceptual design for determining economic viability, licensing and the regulatory process, final design, and project construction with the objective of presenting to the reader a technical and economical guide useful for a similar undertaking.

None

1982-08-01T23:59:59.000Z

279

File:08-CA-d - CPCN for Transmission Projects (2).pdf | Open...  

Open Energy Info (EERE)

(2).pdf Jump to: navigation, search File File history File usage Metadata File:08-CA-d - CPCN for Transmission Projects (2).pdf Size of this preview: 463 599 pixels....

280

Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Keeler-to-Tillamook Transmission Line Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment October 2013 This page deliberately left blank. Bonneville Power Administration i Contents Chapter 1 Purpose and Need for Action ............................................................................................ 1-1 1.1 Introduction ................................................................................................................................. 1-1 1.2 Need for Action ............................................................................................................................ 1-1 1.3 Purposes of Action ....................................................................................................................... 1-2

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

EIS-0378: Port Angeles-Juan de Fuca Transmission Project, WA  

Broader source: Energy.gov [DOE]

This EIS assesses DOE decision to approve the Sea Breeze Transmission project for a Presidential permit for through DOE's Office of Electricity Delivery and Energy Reliability and for approval for interconnection into the federal transmission system through the Bonneville Power Administration (BPA).

282

Wabash River Coal Gasification Repowering Project Final Technical Report  

Office of Scientific and Technical Information (OSTI)

Wabash River Coal Gasification Wabash River Coal Gasification Repowering Project Final Technical Report August 2000 Work Performed Under Cooperative Agreement DE-FC21-92MC29310 For: The U.S. Department of Energy Office of Fossil Energy National Energy Technology Laboratory Morgantown, West Virginia Prepared by: The Men and Women of Wabash River Energy Ltd. For Further Information Contact: Roy A. Dowd, CHMM Environmental Supervisor Wabash River Coal Gasification Repowering Project 444 West Sandford Avenue West Terre Haute, IN 47885 LEGAL NOTICE/DISCLAIMER This report was prepared by the Wabash River Coal Gasification Repowering Project Joint Venture pursuant to a Cooperative Agreement partially funded by the U.S. Department of Energy, and neither the Wabash River Coal Gasification Repowering

283

Final Scientific Report - Wind Powering America State Outreach Project  

SciTech Connect (OSTI)

The goal of the Wind Powering America State Outreach Project was to facilitate the adoption of effective state legislation, policy, finance programs, and siting best practices to accelerate public acceptance and development of wind energy. This was accomplished by Clean Energy States Alliance (CESA) through provision of informational tools including reports and webinars as well as the provision of technical assistance to state leaders on wind siting, policy, and finance best practices, identification of strategic federal-state partnership activities for both onshore and offshore wind, and participation in regional wind development collaboratives. The Final Scientific Report - Wind Powering America State Outreach Project provides a summary of the objectives, activities, and outcomes of this project as accomplished by CESA over the period 12/1/2009 - 11/30/2011.

Sinclair, Mark; Margolis, Anne

2012-02-01T23:59:59.000Z

284

EIS-0325: Final Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Impact Statement EIS-0325: Final Environmental Impact Statement Schultz-Hanford Area Transmission Line Project BPA proposes to construct a new 500-kilovolt (kV) transmission...

285

Manhattan Project: The War Enters Its Final Phase, 1945  

Office of Scientific and Technical Information (OSTI)

American troops approaching the beach, D-Day, June 6, 1944. THE WAR ENTERS ITS FINAL PHASE American troops approaching the beach, D-Day, June 6, 1944. THE WAR ENTERS ITS FINAL PHASE (1945) Events > Dawn of the Atomic Era, 1945 The War Enters Its Final Phase, 1945 Debate Over How to Use the Bomb, Late Spring 1945 The Trinity Test, July 16, 1945 Safety and the Trinity Test, July 1945 Evaluations of Trinity, July 1945 Potsdam and the Final Decision to Bomb, July 1945 The Atomic Bombing of Hiroshima, August 6, 1945 The Atomic Bombing of Nagasaki, August 9, 1945 Japan Surrenders, August 10-15, 1945 The Manhattan Project and the Second World War, 1939-1945 Harry Truman being sworn in as president, April 12, 1945. On April 12, 1945, only weeks before Germany's unconditional surrender on May 7, President Franklin Roosevelt died suddenly in Warm Springs, Georgia. Vice President Harry S. Truman, a veteran of the United States Senate, was now president. Truman had not been privy to many of Roosevelt's internal policy deliberations and had to be briefed extensively in his first weeks in office. One of these briefings, provided by Secretary of War Henry Stimson on April 25, concerned S-1 (the Manhattan Project). Stimson, with Leslie Groves present during part of the meeting, traced the history of the Manhattan Project, summarized its status, and detailed the timetable for testing and combat delivery. Truman asked numerous questions during the forty-five minute meeting and made it clear that he understood the relevance of the atomic bomb to upcoming diplomatic and military initiatives.

286

EA-1931: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment EA-1931: Final Environmental Assessment Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon Bonneville...

287

EA-1896: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment EA-1896: Final Environmental Assessment Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North...

288

Kangley - Echo Lake Transmission Line Project, Supplemental Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration P.O. Box 491 Vancouver, Washington 98666-0491 TRANSMISSION BUSINESS LINE January 14, 2003 In reply refer to: T-DITT-2 To: People Interested in the Kangley-Echo Lake Transmission Line Project Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives. This letter provides

289

Advanced Turbine Technology Applications Project (ATTAP) and Hybrid Vehicle Turbine Engine Technology Support project (HVTE-TS): Final summary report  

SciTech Connect (OSTI)

This final technical report was prepared by Rolls-Royce Allison summarizing the multiyear activities of the Advanced Turbine Technology Applications Project (ATTAP) and the Hybrid Vehicle Turbine Engine Technology Support (HVTE-TS) project. The ATTAP program was initiated in October 1987 and continued through 1993 under sponsorship of the US Department of Energy (DOE), Energy Conservation and Renewable Energy, Office of Transportation Technologies, Propulsion Systems, Advanced Propulsion Division. ATTAP was intended to advance the technological readiness of the automotive ceramic gas turbine engine. The target application was the prime power unit coupled to conventional transmissions and powertrains. During the early 1990s, hybrid electric powered automotive propulsion systems became the focus of development and demonstration efforts by the US auto industry and the Department of energy. Thus in 1994, the original ATTAP technology focus was redirected to meet the needs of advanced gas turbine electric generator sets. As a result, the program was restructured to provide the required hybrid vehicle turbine engine technology support and the project renamed HVTE-TS. The overall objective of the combined ATTAP and HVTE-TS projects was to develop and demonstrate structural ceramic components that have the potential for competitive automotive engine life cycle cost and for operating 3,500 hr in an advanced high temperature turbine engine environment. This report describes materials characterization and ceramic component development, ceramic components, hot gasifier rig testing, test-bed engine testing, combustion development, insulation development, and regenerator system development. 130 figs., 12 tabs.

NONE

1998-12-01T23:59:59.000Z

290

BPA, Transmission, I-5 Corridor Reinforcement Project, January...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

soon as possible. The decision document is available on the I-5 Project website at www.bpa.govgoi5. Non-wire measures won't delay route analysis As plans take shape to address...

291

Copy of FINAL SG Demo Project List 11 13 09-External.xls | Department...  

Office of Environmental Management (EM)

Copy of FINAL SG Demo Project List 11 13 09-External.xls More Documents & Publications Smart Grid Regional and Energy Storage Demonstration Projects: Awards Energy Storage...

292

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Broader source: Energy.gov (indexed) [DOE]

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

293

Buffalo Flat Service 115-KV Transmission Project : Environmental Assessment.  

SciTech Connect (OSTI)

BPA, in conjunction with Midstate Electric Cooperative (Midstate), proposed to construct two sections of a new 115-kV transmission line in central Oregon: one section from BPA's LaPine Substation to Midstate's Fort Rock Substation (BPA), and the other from Fort Rock Substation to the proposed US Air Force radar transmitter site at Buffalo Flat (Midstate). The proposed line would be a total of about 74 miles long, and of either wood or steel single-pole construction; it would parallel existing corridors and/or roads for much of the distance. 23 refs., 6 figs., 5 tabs.

United States. Bonneville Power Administration.

1987-07-01T23:59:59.000Z

294

Programmable SAW development :Sandia/NASA project final report.  

SciTech Connect (OSTI)

This report describes a project to develop both fixed and programmable surface acoustic wave (SAW) correlators for use in a low power space communication network. This work was funded by NASA at Sandia National Laboratories for fiscal years 2004, 2003, and the final part of 2002. The role of Sandia was to develop the SAW correlator component, although additional work pertaining to use of the component in a system and system optimization was also done at Sandia. The potential of SAW correlator-based communication systems, the design and fabrication of SAW correlators, and general system utilization of those correlators are discussed here.

Brocato, Robert Wesley

2004-10-01T23:59:59.000Z

295

Willow Creek Wildlife Mitigation- Project Final Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Willow Creek Wildlife Mitigation- Project Willow Creek Wildlife Mitigation- Project Final Environmental Assessment DOE-EA-1 023 Bonneville POWER ADMINISTRATION April 1995 DISCLAIMER This report w a s prepared a s an account of work sponsored by an agency of t h e United States Government. Neither t h e United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or a s s u m e s any legal liability or responsibility for t h e accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents t h a t its use would not infringe privately owned rights. Reference herein to any specific commercial, product, process, or service by trade name, trademark, manufacturer, or otherwise d o e s not necessarily constitute or imply its

296

Final Report Northeast Site Area B NAPL Remediation Project  

Office of Legacy Management (LM)

Northeast Site Area B Northeast Site Area B NAPL Remediation Project at the Young - Rainey STAR Center Largo, Pinellas County, Florida April 2007 Office of Legacy Management DOE M/1457 2007 - -L Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy This page intentionally left blank DOE-LM/1457-2007 Final Report Northeast Site Area B NAPL Remediation Project at the Young - Rainey STAR Center Largo, Pinellas County, Florida April 2007 Work Performed by S.M. Stoller Corporation under DOE Contract No. DE-AC01-02GJ79491 for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado

297

Final Update on APBF-DEC EGR/DPF/SCR Demonstration Project at...  

Broader source: Energy.gov (indexed) [DOE]

Final Update on APBF-DEC EGRDPFSCR Demonstration Project at SwRI Final Update on APBF-DEC EGRDPFSCR Demonstration Project at SwRI 2005 Diesel Engine Emissions Reduction (DEER)...

298

Ferrocyanide safety project ferrocyanide aging studies. Final report  

SciTech Connect (OSTI)

This final report gives the results of the work conducted by Pacific Northwest National Laboratory (PNNL) from FY 1992 to FY 1996 on the Ferrocyanide Aging Studies, part of the Ferrocyanide Safety Project. The Ferrocyanide Safety Project was initiated as a result of concern raised about the safe storage of ferrocyanide waste intermixed with oxidants, such as nitrate and nitrite salts, in Hanford Site single-shell tanks (SSTs). In the laboratory, such mixtures can be made to undergo uncontrolled or explosive reactions by heating dry reagents to over 200{degrees}C. In 1987, an Environmental Impact Statement (EIS), published by the U.S. Department of Energy (DOE), Final Environmental Impact Statement, Disposal of Hanford Defense High-Level Transuranic and Tank Waste, Hanford Site, Richland, Washington, included an environmental impact analysis of potential explosions involving ferrocyanide-nitrate mixtures. The EIS postulated that an explosion could occur during mechanical retrieval of saltcake or sludge from a ferrocyanide waste tank, and concluded that this worst-case accident could create enough energy to release radioactive material to the atmosphere through ventilation openings, exposing persons offsite to a short-term radiation dose of approximately 200 mrem. Later, in a separate study (1990), the General Accounting Office postulated a worst-case accident of one to two orders of magnitude greater than that postulated in the DOE EIS. The uncertainties regarding the safety envelope of the Hanford Site ferrocyanide waste tanks led to the declaration of the Ferrocyanide Unreviewed Safety Question (USQ) in October 1990.

Lilga, M.A.; Hallen, R.T.; Alderson, E.V. [and others

1996-06-01T23:59:59.000Z

299

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

300

OFF VUF-2700 FINAL REPORT VELA UNIFORM PROJECT SPONSORED BY  

Office of Legacy Management (LM)

09 09 OFF VUF-2700 FINAL REPORT VELA UNIFORM PROJECT SPONSORED BY THE ADVANCED RESEARCH PROJECTS AGENCY OF THE DEPARTMENT OF DEFENSE AND THE U.S. ATOMIC ENERGY COMMISSION FALLON, NEVADA OCTOBER 26, 1963 Project 9.1 U.s. Army Engineer Waterways Experiment Station James M. Polatty / James E. McDonald Issuance Dates May 1j 1965 IT lAS VEGAS llBiU\Rl LEG A L NOTICE '. ':" This report was prepared as an account or Government eponecred work. Neither the United States, nor the commtseton, nor any pereon acting oabahal! of the Commission: A.Makesany warranty or representation. e.xpressedor implied, with reepect to the accu- racy, completeness,orusefulnes8o! tbeinformaUoncontalned in this report, cr tbst the use of any tntormeucn, appa-ratua, method, or prcceee disclosed in this report may not infringe privately owned rights; or B. Assumes any lIabUitlea wIth respect to the use of.

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Blue Creek Winter Range : Wildlife Mitigation Project : Final Environmental Assessment.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

1994-11-01T23:59:59.000Z

302

Reliability evaluation for large-scale bulk transmission systems: Volume 1, Comparative evaluation, method development, and recommendations: Final report  

SciTech Connect (OSTI)

This volume (1 of 2) contains a comparative evaluation of existing transmission system reliability programs (SYREL, GATOR, RECS) and relevant mathematical methods for transmission reliability analysis. Several new and enhanced methods in the areas of network analysis, contingency selection, remedial action, and reliability index calculation, developed and tested during the project, are described. Recommendations for methods to be used in a production grade transmission reliability assessment program are presented. 69 figs., 41 tabs.

Lam, B.P.; Lawrence, D.J.; Reppen, N.D.; Ringlee, R.J.

1988-01-01T23:59:59.000Z

303

Silver Creek-Morton Transmission Project: Environmental assessment  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) will in 1989, replace the Silver Creek-Morton 69-kV transmission line with a line of 115-kV construction and, in the late 1990's, add capacitors at Morton Substation. Portions of the new line would be constructed on new right-of-way adjacent to the old 69-kV line and portions would be constructed on the same right-of-way. Construction on adjacent right-of-way would require new right-of-way up to 50 feet wide on one side of the present right-of-way. BPA would then release to private ownership right-of-way up to 50 feet wide on the opposite side, after the old line has been removed. Parts of the new line would be constructed on H-frame wood-pole sructures and parts on single wood-pole structures, depending on land use constraints. 16 refs., 3 figs., 3 tabs.

Not Available

1986-06-01T23:59:59.000Z

304

DOE/EA-1342: Shelton-Kitsap Transmission Line Rebuild Final Environmental Assessment and Finding of No Significant Impact (01/17/01)  

Broader source: Energy.gov (indexed) [DOE]

A N U A R Y 2 0 0 1 A N U A R Y 2 0 0 1 SHELTON-KITSAP TRANSMISSION LINE REBUILD Final Environmental Assessment and Finding of No Significant Impact DOE/EA-1342 DEPARTMENT OF ENERGY Bonneville Power Administration Shelton-Kitsap Transmission Line Rebuild Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings. Summary: This notice announces Bonneville Power Administration's (BPA) proposal to rebuild its existing Shelton-Kitsap No. 2 115-kilovolt (kV) transmission line as a double-circuit 230-kV line in the existing right-of-way, in order to improve system capability and reliability. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1342) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major

305

EIS-0451: Final Environmental Impact Statement | Department of...  

Energy Savers [EERE]

51: Final Environmental Impact Statement EIS-0451: Final Environmental Impact Statement Hooper Springs Transmission Project, Caribou County, Idaho DOE's Bonneville Area Power...

306

EA-1891: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment EA-1891: Final Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon Bonneville Power Administration prepared an EA to...

307

EA-1595: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment EA-1595: Final Environmental Assessment Davis-Mead 230-kV Transmission Line Reconductor Project This environmental assessment's proposed action is...

308

EA-1948: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment EA-1948: Final Environmental Assessment Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona DOE's Western Area Power...

309

EIS-0090: Final Environmental Impact statement | Department of...  

Energy Savers [EERE]

090: Final Environmental Impact statement EIS-0090: Final Environmental Impact statement Fort Peck-Havre Transmission Line Project, Montana EIS-0090...

310

EIS-0377: DOE Notice of Availability of the Final Environmental...  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement EIS-0377: DOE Notice of Availability of the Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project The Western...

311

EIS-0421: Final Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement EIS-0421: Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA...

312

Final Environmental Impact Statement for the FutureGen Project  

Broader source: Energy.gov (indexed) [DOE]

I I Chapters 1-3, 8-12 Appendices NOVEMBER 2007 U.S. Department of Energy National Energy Technology Laboratory COVER SHEET Responsible Agency: U.S. Department of Energy Title: Final Environmental Impact Statement for FutureGen Project (DOE/EIS-0394) Location: Mattoon, Illinois; Tuscola, Illinois; Jewett, Texas; and Odessa, Texas Contact: For further information about this Environmental Impact Statement, contact: For general information on the U.S. Department of Energy's process for implementing the National Environmental Policy Act, contact: Mark McKoy, Document Manager U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 (304) 285-4426 or fax (304) 285-4403 Carol Borgstrom, Director

313

REAL TIME GRID RELIABILITY MANAGEMENT 2005 PIER FINAL PROJECT REPORT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

REAL TIME GRID RELIABILITY REAL TIME GRID RELIABILITY MANAGEMENT 2005 Prepared For: California Energy Commission Public Interest Energy Research Program Prepared By: Lawrence Berkeley National Laboratory PIER FINAL PROJECT REPORT LBNL-62368 ii Legal Notice This report was prepared as a result of work sponsored by the California Energy Commission (Energy Commission). It does not necessarily represent the views of the Energy Commission, its employees, or the State of California. The Energy Commission, the State of California, its employees, contractors, and subcontractors make no warrant, express or implied, and assume no legal liability for the information in this report; nor does any party represent that the use of this information will not infringe upon privately owned rights. This report has not been

314

Blue Creek Winter Range: Wildlife Mitigation Project Final Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Creek Winter Range: Creek Winter Range: Wildlife Mitigation Project Final Environmental Assessment I F 8 - Spokane Tribe of Indians Bonneville POWER ADMINISTRATION B r n u r r o N aF THIS D O C ~ I H ~ E E 1% utifi_;'iUzi: w DOVEA-0939 November1 994 Bureay of Indian Affairs DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. DISCLAIMER This report was .prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or

315

Final Environmental Impact Statement for the FutureGen Project  

Broader source: Energy.gov (indexed) [DOE]

Summary NOVEMBER 2007 U.S. Department of Energy National Energy Technology Laboratory COVER SHEET Responsible Agency: U.S. Department of Energy Title: Final Environmental Impact Statement for FutureGen Project (DOE/EIS-0394) Location: Mattoon, Illinois; Tuscola, Illinois; Jewett, Texas; and Odessa, Texas Contact: For further information about this Environmental Impact Statement, contact: For general information on the U.S. Department of Energy's process for implementing the National Environmental Policy Act, contact: Mark McKoy, Document Manager U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507-0880 (304) 285-4426 or fax (304) 285-4403 Carol Borgstrom, Director

316

FINAL REPORT VELA UNIFORM PROJECT SPONSORED BY THE ADVANCED RESEARCH PROJECTS AGENCY OF THE  

Office of Legacy Management (LM)

VUF -1009 VUF -1009 FINAL REPORT - VELA UNIFORM PROJECT SPONSORED BY THE ADVANCED RESEARCH PROJECTS AGENCY OF THE DEPARTMENT OF DEFENSE AND THE U. S. ATOMIC ENERGY COMMl SSlON FALLON, NEVADA OCTOBER 26,1963 FINAL REPORT OF OFF-SITE SURVEILLANCE Southwestern Radiological Health Laboratory September 1, 1964 Issuance Date: November 27, 1964 L E G A L N O T I C E This report war preprred a r an account of Government rponrored work. Neither the Unlted Strtor, nor the Commlerlon, nor m y perron acting on behalf of the Commlrslon: A. Maker any warranty o r reprerentition, exprerred o r Implied, wlth respect to the accu- racy, completanerr, o r urefulners of the lnfornutlon contrlned in thls report, o r that the u r e of any lnformnti~n. apparatur, method, o r procerr dlrclored in thlr report may not infringe

317

Final Environmental Impact Statement for the FutureGen Project  

Broader source: Energy.gov (indexed) [DOE]

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT REVISED OCTOBER 2007 5-2 Figure 5-1. Role of the Analog Site Database and Ancillary Databases in the Approach for Conducting the Risk Assessment FINAL RISK ASSESSMENT REPORT REVISED OCTOBER 2007 5-100 Figure 5-6. Area Within Which H 2 S Released from CO 2 Injection Wells Exceeds Chronic Toxicity Criteria (i.e., 0.0014 ppmv H 2 S) at the Tuscola (IL) Site DOE/EIS-0394 FUTUREGEN PROJECT EIS FINAL SUMMARY NOVEMBER 2007 S-10 Figure S-4. Proposed Mattoon Power Plant and Sequestration Site Figure S-5. Proposed Utility Corridors for the Mattoon Power Plant and Sequestration Site Mattoon Power Plant and Sequestration Site Coles County Shelby County Shelby County Moultrie County C a n a d i a n N a t i o n a l R a i l r o a d Lake Shelbyville Lake Paradise C a n a d i a n N a t

318

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

ES-1 ES-1 ES.0 Summary In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). The proposed Project would be constructed by Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River Energy, Heartland Consumers Power District, Montana-Dakota Utilities Co., Southern Minnesota Municipal Power Agency, and

319

Umatilla Satellite and Release Sites Project : Final Siting Report.  

SciTech Connect (OSTI)

This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

Montgomery, James M.

1992-04-01T23:59:59.000Z

320

File:Transmission Siting White Paper Final.pdf | Open Energy Information  

Open Energy Info (EERE)

Siting White Paper Final.pdf Siting White Paper Final.pdf Jump to: navigation, search File File history File usage File:Transmission Siting White Paper Final.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 6.47 MB, MIME type: application/pdf, 58 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:19, 13 November 2012 Thumbnail for version as of 15:19, 13 November 2012 1,275 × 1,650, 58 pages (6.47 MB) Dklein2012 (Talk | contribs)

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

322

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register  

Broader source: Energy.gov [DOE]

The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

323

CERTS Microgrid Laboratory Test Bed - PIER Final Project Report  

SciTech Connect (OSTI)

The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.

Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert; Schenkman, Ben; Klapp, Dave; Linton, Ed; Hurtado, Hector; Roy, Jean; Lewis, Nancy Jo; Stevens, John; Volkommer, Harry

2008-07-25T23:59:59.000Z

324

NTRCI Legacy Engine Research and Development Project Final Technical Report  

SciTech Connect (OSTI)

The Legacy engine is a completely new design, transitional diesel engine, replacing the reciprocating engine with a rotary engine. The Legacy engine offers significant advances over conventional internal combustion engines in 1) power to weight ratio; 2) multiple fuel acceptance; 3) fuel economy; and 4) environmental compliance. These advances are achieved through a combination of innovative design geometry, rotary motion, aspiration simplicity, and manufacturing/part simplicity. The key technical challenge to the Legacy engineâ??s commercialization, and the focus of this project, was the development of a viable roton tip seal. The PST concept for the roton tip seal was developed into a manufacturable design. The design was evaluated using a custom designed and fabricated seal test fixture and further refined. This design was incorporated into the GEN2.5A prototype and tested for achievable compression pressure. The Decision Point at the end of Phase 1 of the project (described below) was to further optimize the existing tip seal design. Enhancements to the tip seal design were incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Compression pressures adequate for compression ignition of diesel fuel were achieved, although not consistently in all combustion volumes. The variation in compression pressures was characterized versus design features. As the roton tip seal performance was improved, results pointed toward inadequate performance of the housing side seals. Enhancement of the housing side seal system was accomplished using a custom designed side seal test fixture. The design enhancements developed with the test fixture were also incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector was designed, manufactured and demonstrated in the GEN2.5B prototype.

Connie Smith-Holbert; Joseph Petrolino; Bart Watkins; David Irick

2011-12-31T23:59:59.000Z

325

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

326

Environmental Assessment for the USK Loop Line 230 kV Transmission Project.  

SciTech Connect (OSTI)

This Environmental Assessment (EA) covers the transmission/substation facilities that would be constructed or modified. It has been prepared by an interdisciplinary team, as well as through consultation on the Federal, state and local levels. It is subject to a 60-day review by the general public and other agencies and will generally coincide with the release of the final state EIS. This EA presents an expansion of those transmission-related discussions in the state EIS where BPA could undertake their construction or modifiction.

United States. Bonneville Power Administration.

1985-09-01T23:59:59.000Z

327

West Valley Demonstration Project Waste Management Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

WVDP Waste Management EIS WVDP Waste Management EIS S-3 Figure S-1. Location of the West Valley Demonstration Project Not to scale Final WVDP Waste Management EIS S-23 Table S-2. Summary of Normal Operational Impacts at West Valley Impact Area Unit of Measure No Action Alternative Alternative A - Preferred Alternative B Human Health Impacts a Public Impacts from Ongoing Operations MEI LCF 3.7 Ă— 10 -7 3.7 Ă— 10 -7 3.7 Ă— 10 -7 Population LCF 1.5 Ă— 10 -3 1.5 Ă— 10 -3 1.5 Ă— 10 -3 Worker Impacts Involved worker MEI LCF 3.4 Ă— 10 -4 1.3 Ă— 10 -3 1.3 Ă— 10 -3 Noninvolved worker MEI LCF 3.0 Ă— 10 -4 3.0 Ă— 10 -4 3.0 Ă— 10 -4 Involved worker population LCF 2.1 Ă— 10 -3 0.031 0.031 Noninvolved worker population LCF 0.075 0.075 0.075 Total worker population LCF 0.077 0.11 0.11

328

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010)  

Broader source: Energy.gov (indexed) [DOE]

PROJECT PROPOSAL PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge ....................................................................................................................................... 1 2. The Solution .......................................................................................................................................... 1 SECTION I: STATUTORY CRITERIA 1. General Description of the Entity ................................................................................................... 4 2. Project Description ............................................................................................................................. 5

329

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota  

Broader source: Energy.gov [DOE]

The USDA Rural Utilities Service, with DOE’s Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1).)

330

Final load of debris shipped from K-25 Building demolition project  

Broader source: Energy.gov [DOE]

On March 11, The final truckload of debris from the K-25 Building demolition project was shipped from East Tennessee Technology Park (ETTP).

331

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.  

SciTech Connect (OSTI)

BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

332

DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014  

Broader source: Energy.gov [DOE]

ACQUISITION AND PROJECT MANAGEMENT GLOSSARY OF TERMS HANDBOOK This handbook provides definitions of acquisition and project management terms commonly used in DOE projects to ensure consistent use of terms in DOE project documents and discussions. DOE APM Glossary of Terms Handbook – Final, September 2014

333

(DOE/EIS-0128-SA-02): Supplement Analysis: Los Banos-Gates (Path 15) Transmission line project changes to alignment, access road stream crossing, and basis for Supplemental EIS Determination  

Broader source: Energy.gov (indexed) [DOE]

Los Banos-Gates (Path 15) Transmission Line Project DOE/EIS-0128-SA02 Western Area Power Administration Sierra Nevada Customer Service Region U.S. Department of Energy Changes to Alignment, Access Road Stream Crossing, and Basis for Supplemental Environmental Impact Statement Determination Background The Los Banos-Gates 500-kilovolt Transmission Line project was originally proposed as part of the California-Oregon Transmission Project in the 1980s. These two projects were the subject of a single set of documents prepared in 1986 (draft) and 1988 (final) that served as the Environmental Impact Statement (EIS) under the National Environmental Policy Act and the Environmental Impact Report (EIR) under the California Environmental Quality Act. The EIS is entitled "Final Environmental Impact

334

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

, and project oversight. Integrated Combined Heat and Power Systems Corporation, Gearoid Foley for the Combined Heat and Power project (Contr INTEGRATED COOLING, HEATING AND ENGINE POWER MODULE FEBRUARY 2010 CEC5002009098 Prepared for: California

335

Port Angeles-Juan de Fuca Transmission Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

This summary includes information regarding the following elements of the draft environmental impact statement (EIS) prepared for the Port Angeles-Juan de Fuca Transmission Project: * purpose and need for action; * Proposed Action and No Action Alternative; and * affected environment, environmental impacts, and mitigation measures. S.1 Purpose and Need for Action Sea Breeze Olympic Converter LP (Sea Breeze) has applied to the United States Department of Energy (DOE) for authorizations and approvals necessary to construct the U.S. portion of a proposed international electric power transmission cable. Specifically, Sea Breeze has applied to the Office of Electricity Delivery and Energy Reliability (DOE/OE), an organizational unit within DOE, for a Presidential permit for its project. Sea Breeze has also submitted a request to

336

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

and the Home Automation Network (AMIHAN) interface project (contract number 50099013, work authorization infrastructure interface to customer home automa

337

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

to the research. We thank them for the time and funds spent supporting the projects. Alerton Automated Logic

338

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado. Additional information is available on Western’s project website.

339

EIS-0164: Pacific Gas Transmission/Pacific Gas and Electric and Altamont Natural Gas Pipeline Project  

Broader source: Energy.gov [DOE]

The Federal Energy Regulatory Commission (FERC) has prepared the PGT/PG&E and Altamont Natural Gas Pipeline Projects Environmental Impact Statement to satisfy the requirements of the National Environmental Policy Act. This project addresses the need to expand the capacity of the pipeline transmission system to better transfer Canadian natural gas to Southern California and the Pacific Northwest. The U.S. Department of Energy cooperated in the preparation of this statement because Section 19(c) of the Natural Gas Act applies to the Department’s action of authorizing import/export of natural gas, and adopted this statement by the spring of 1992. "

340

Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

United States. Bonneville Power Administration.

1992-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Canby Area Service Project substation and associated transmission line. Environmental Assessment  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

Not Available

1992-02-01T23:59:59.000Z

342

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

343

Final Independent External Peer Review for the Biscayne Bay Coastal Wetlands Project  

E-Print Network [OSTI]

Final Independent External Peer Review for the Biscayne Bay Coastal Wetlands Project Implementation-TERM ANALYSIS SERVICE (STAS) on Final Independent External Peer Review Report Biscayne Bay Coastal Wetlands COASTAL WETLANDS PROJECT IMPLEMENTATION REPORT EXECUTIVE SUMMARY The Biscayne Bay Coastal Wetlands (BBCW

US Army Corps of Engineers

344

Microsoft Word - 564M_Biomass_Project Descriptions FINAL 120409  

Broader source: Energy.gov (indexed) [DOE]

Grant Grant Amount Non-Fed Amount Project Location (City) Project Location (State) Description 1) Pilot and Demonstration Scale FOA - Pilot Scale Algenol Biofuels Inc. $25,000,000 $33,915,478 Freeport TX This project will make ethanol directly from carbon dioxide and seawater using algae. The facility will have the capacity to produce 100,000 gallons of fuel- grade ethanol per year. American Process Inc. $17,944,902 $10,148,508 Alpena MI This project will produce fuel and potassium acetate, a compound with many industrial applications, using processed wood generated by Decorative Panels International, an existing hardboard manufacturing facility in Alpena. The pilot plant will

345

Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.  

SciTech Connect (OSTI)

This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

346

Honey Lake Geothermal Project, Lassen County, California. Final technical report  

SciTech Connect (OSTI)

This report discusses the drilling, completion, and testing of deep well WEN-2 for a hybrid electric power project which will use the area's moderate temperature geothermal fluids and locally procured wood fuel. The project is located within the Wendel-Amedee Known Geothermal Resource Area. (ACR)

Not Available

1984-11-01T23:59:59.000Z

347

Kangley - Echo Lake Transmission Line Project Supplemental Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) is proposing to build a new transmission line to accommodate increasing demand for electricity and address reliability concerns in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmission line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as during a winter cold snap, could cause voltage instability and a loss of power in the King County area. System planners have projected total system load using normal growth in demand and determined that system instability could develop as early as the winter of 2002-03. Besides meeting this need for system reliability, this project would enhance the United States' delivery of power to Canada as required under the Columbia River Treaty of 1961. BPA described and analyzed transmission route alternatives in a draft environmental impact statement (DEIS) released in June 2001. The DEIS identified a preferred alternative that would parallel an existing BPA transmission line through the Cedar River Municipal Watershed. BPA received over 700 comments from landowners, agencies, tribes and special interest groups on the DEIS. Many of the comments suggested BPA re-evaluate the range of alternatives considered and prepare a supplemental draft environmental impact statement (SDEIS). After reviewing the comments and refining the cost estimates associated with BPA's preferred alternative, BPA decided to prepare this SDEIS to re-evaluate alternatives not analyzed in detail in the DEIS. The added transmission alternatives, all located outside of the Cedar River Watershed, were initially considered but dropped from detailed analysis. They are identified as Alternatives A, B, C, and D. Alternatives A and C are located to the west of the Cedar River Watershed boundary. Alternatives B and D cross the Mt. Baker-Snoqualmie and Okanogan-Wenatchee National Forests. Under all transmission alternatives, Echo Lake Substation would be expanded about three acres to the east and new equipment to accommodate the new line would be installed. BPA is also considering a Non-Transmission Alternative and the No Action Alternative.

N /A

2003-01-10T23:59:59.000Z

348

Klondike III/Biglow Canyon Wind Integration Project; Final Environmental Impact Statement, September 2006.  

SciTech Connect (OSTI)

BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. (Portland General Electric recently bought the rights to develop the proposed Biglow Canyon Wind Farm from Orion Energy, LLC.) Both wind projects received Site Certificates from the Oregon Energy Facility Siting Council on June 30, 2006. To interconnect these projects, BPA would need to build and operate a 230-kV double-circuit transmission line about 12 miles long, expand one substation and build one new substation. The wind projects would require wind turbines, substation(s), access roads, and other facilities. Two routes for the transmission line are being considered. Both begin at PPM's Klondike Schoolhouse Substation then travel north (Proposed Action) or north and westerly (Middle Alternative) to a new BPA 230-kV substation next to BPA's existing John Day 500-kV Substation. BPA is also considering a No Action Alternative in which BPA would not build the transmission line and would not interconnect the wind projects. The proposed BPA and wind projects would be located on private land, mainly used for agriculture. If BPA decides to interconnect the wind projects, construction of the BPA transmission line and substation(s) could commence as early as the winter of 2006-07. Both wind projects would operate for much of each year for at least 20 years. The proposed projects would generally create no or low impacts. Wildlife resources and local visual resources are the only resources to receive an impact rating other than ''none'' or ''low''. The low to moderate impacts to wildlife are from the expected bird and bat mortality and the cumulative impact of this project on wildlife when combined with other proposed wind projects in the region. The low to high impacts to visual resources reflect the effect that the transmission line and the turbine strings from both wind projects would have on viewers in the local area, but this impact diminishes with distance from the project.

United States. Bonneville Power Administration

2006-09-01T23:59:59.000Z

349

Microsoft Word - Project_Fact_Sheet_wPictures_FINAL.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Microholes for Oil Production and Microholes for Oil Production and Emplacement of Subsurface Seismic Instrumentation ID Number: 03FE06-4 Program The goals of the present Phase II project are (1) to demonstrate the use of microboreholes with 1-in.-diameter, retrievable seismic arrays installed in the bores, to collect high quality seismic data at a substantially reduced cost compared with the use of conventional-sized boreholes, and (2) to determine if higher quality seismic data can be obtained in a microhole well completion that is designed to enhance seismic-data collection. This project evolved from the earlier Phase I project with a goal to demonstrate the use of microboreholes for use as producing oil wells. Project Goals The overall objective of the Los Alamos National Laboratory (Los Alamos) Phase II

350

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

FOR REDUCING BIODIESEL FACILITY WATER CONSUMPTION AND WASTEWATER DISCHARGE JULY 2013 CEC5002013018 for the Integrated System for Reducing Biodiesel Facility Water Consumption and Wastewater Discharge project a combination of distillation, ultrafiltration, and reverse osmosis technologies, for treating and recycling

351

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

DISTRIBUTED ENERGY RESOURCE UTILITY INTERFACE Prepared for: California Energy Commission Prepared: California Energy Commission Bernard Treanton Project Manager Mike Gravely Office Manager Energy Systems Energy Commission. It does not necessarily represent the views of the Energy Commission, its employees

352

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

Lead Agency: U.S. Department of Energy, Western Area Power Administration Lead Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of Agriculture, Rural Utilities Service U.S. Department of Defense, Army Corps of Engineers Title: Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement Location: Proposed Big Stone II Plant: Big Stone City, South Dakota Proposed Transmission Facilities: Northeastern South Dakota and Southwestern Minnesota Contacts: For additional information on this Supplemental Draft Environmental Impact Statement, or to receive a copy, contact: For general information on the DOE National Environmental Policy Act process, write or call: Ms. Nancy Werdel Western Area Power Administration

353

Final Report - Navajo Electrification Demonstration Project - FY2004  

SciTech Connect (OSTI)

The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

Kenneth L. Craig, Interim General Manager

2007-03-31T23:59:59.000Z

354

Fernald Environmental Management Project Director's Final Findings and Orders, October 4, 1995  

Broader source: Energy.gov (indexed) [DOE]

Fernald Environmental Management Project Director's Final Findings and Orders, Octobe.. Page 1 of 17 Fernald Environmental Management Project Director's Final Findings and Orders, Octobe.. Page 1 of 17 EM Home | Regulatory Compliance | Environmental Compliance Agreements Fernald Environmental Management Project Director's Final Findings and Orders, October 4, 1995 BEFORE THE OHIO ENVIRONMENTAL PROTECTION AGENCY In the Matter Of: United States Department of Energy : Director's Final Fernald Environmental Management Project : Findings and Orders P.O. Box 389705 : Cincinnati, Ohio 45239 : Respondent It is hereby agreed by and among the parties hereto as follows: Table of Contents I. Jurisdiction II. Parties Bound III. Definitions IV. Findings of Fact V. Orders VI. Limitations of Director's Approval VII. Notice VIII. Project Managers IX. Dispute Resolution

355

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

356

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Broader source: Energy.gov (indexed) [DOE]

Statement Statement DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (DOE/EIS-0285) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy Cooperating Agencies: U.S. Forest Service (FS), U.S. Department of Agriculture; Bureau of Land Management (BLM), U.S. Department of Interior Title of Proposed Action: Transmission System Vegetation Management Program States Involved: California, Idaho, Montana, Oregon, Utah, Washington, and Wyoming Abstract: Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation.

357

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

GEOTHERMAL WELL FB4 Prepared for: California Energy Commission Prepared by: Fort Bidwell Indian Community Geothermal Well FB4. California Energy Commission, PIER Renewables Program. CEC-500-2012-061. i #12;ii #12 · Renewable Energy Technologies · Transportation Assessment of Fort Bidwell Geothermal Well FB4 is the final

358

Energy Research and Development Division FINAL PROJECT REPORT  

E-Print Network [OSTI]

Generation · Industrial/Agricultural/Water EndUse Energy Efficiency · Renewable Energy Technologies · Transportation Improving Efficiency of SparkIgnited, Stoichiometrically Operated Natural Gas Engines is the final report for the Improving Efficiency Of SparkIgnited, Stoichiometric Operated Natural Gas Engine

359

Moving Beyond Paralysis: How States and Regions Are Creating Innovative Transmission Projects; May 2009 - May 2010  

SciTech Connect (OSTI)

This report profiles certain state and regional transmission policy initiatives aimed at promoting transmission development, mainly to access renewable resources.

Schumacher, A.; Fink, S.; Porter, K.

2009-10-01T23:59:59.000Z

360

Final Reclamation Report: Basalt Waste Isolation Project exploratory shaft site  

SciTech Connect (OSTI)

The restoration of areas disturbed by activities of the Basalt Waste Isolation Project (BWIP) constitutes a unique operation at the US Department of Energy's (DOE) Hanford Site, both from the standpoint of restoration objectives and the time frame for accomplishing these objectives. The BWIP reclamation program comprises three separate projects: borehole reclamation, Near Surface Test Facility (NSTF) reclamation, and Exploratory Shaft Facility (ESF) reclamation. The main focus of this report is on determining the success of the revegetation effort 1 year after work was completed. This report also provides a brief overview of the ESF reclamation program. 21 refs., 7 figs., 14 tabs.

Brandt, C.A.; Rickard, W.H. Jr.

1990-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov (indexed) [DOE]

1 1 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 1: Main Text and Appendixes A-L U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Cover Sheet Imperial-Mexicali FEIS iii December 2004 COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy, Office of Fossil Energy COOPERATING AGENCY: U.S. Department of the Interior, Bureau of Land Management TITLE: Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines LOCATION: Imperial County, California CONTACT: For further information on this environmental impact statement (EIS) contact: Mrs. Ellen Russell Office of Electric Power Regulation Office of Fossil Energy, FE-27

362

Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan  

SciTech Connect (OSTI)

The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP).

GREAGER, T.M.

1999-12-14T23:59:59.000Z

363

Urban Options Solar Greenhouse Demonstration Project. Final report  

SciTech Connect (OSTI)

The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

Cipparone, L.

1980-10-15T23:59:59.000Z

364

Game Theory Final Project Lucas Majerowicz id: 329012637  

E-Print Network [OSTI]

of this project is to improve the results presented in the "On Bitcoins and Red Balloons" paper. For this, I to a more general model than its authors assume. Motivation ­ The Bitcoin Protocol Bitcoin of its transactions. Suppose that Alice wants to transfer 10 bitcoins to Bob. In order to do this, Alice

Fiat, Amos

365

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

(RD&D) projects to benefit the electricity and natural gas ratepayers in California. The Energy for natural gas RD&D. The PIER program strives to conduct the most promising public interest energy: · Buildings EndUse Energy Efficiency · Industrial/Agricultural/Water EndUse Energy Efficiency · Renewable

366

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT  

E-Print Network [OSTI]

, and demonstration (RD&D) projects to benefit the electricity and natural gas ratepayers in California. The Energy EndUse Energy Efficiency · Industrial/Agricultural/Water EndUse Energy Efficiency · Renewable Energy for natural gas RD&D. PIER funding efforts are focused on the following RD&D program areas: · Buildings

367

Final Environmental Impact Statement for the FutureGen Project  

Broader source: Energy.gov (indexed) [DOE]

Revision 1 April 2007) Revision 1 April 2007) (Revision 2 October 2007) FINAL RISK ASSESSMENT REPORT Revised October 2007 i TABLE OF CONTENTS 1.0 INTRODUCTION .........................................................................................................................1-1 2.0 CONCEPTUAL SITE MODELS ..................................................................................................2-1 2.1 Generic Conceptual Model Applicable to All Sites...................................................................2-1 2.2 Power Plant and Capture of Carbon Dioxide and Other Gases..................................................2-3 2.3 Generic Sequestration Site Description .....................................................................................2-5

368

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

A-1 A-1 APPENDIX A CONSULTATION LETTERS This appendix includes consultation/approval letters between the U.S. Department of Energy and the U.S. Fish and Wildlife Service regarding threatened and endangered species, and between other state and Federal agencies as needed. Consultation Letters A-2 Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement A-3 Consultation Letters A-4 Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement A-5 Consultation Letters A-6 Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement A-7 Consultation Letters A-8 Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement B-1 APPENDIX B NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE

369

Economic Contributions of the Turfgrass Industry Final Project Report to the Florida Turfgrass Association  

E-Print Network [OSTI]

Economic Contributions of the Turfgrass Industry in Florida Final Project Report to the Florida of Food and Agricultural Sciences Food and Resource Economics Department Gainesville, FL Corresponding.....................................................................................................................................................21 Economic Contribution Analysis

Florida, University of

370

Encoal mild coal gasification project: Final design modifications report  

SciTech Connect (OSTI)

The design, construction and operation Phases of the Encoal Mild Coal Gasification Project have been completed. The plant, designed to process 1,000 ton/day of subbituminous Power River Basin (PRB) low-sulfur coal feed and to produce two environmentally friendly products, a solid fuel and a liquid fuel, has been operational for nearly five years. The solid product, Process Derived Fuel (PDF), is a stable, low-sulfur, high-Btu fuel similar in composition and handling properties to bituminous coal. The liquid product, Coal Derived Liquid (CDL), is a heavy, low-sulfur, liquid fuel similar in properties to heavy industrial fuel oil. Opportunities for upgrading the CDL to higher value chemicals and fuels have been identified. Significant quantities of both PDF and CDL have been delivered and successfully burned in utility and industrial boilers. A summary of the Project is given.

NONE

1997-07-01T23:59:59.000Z

371

Advanced exterior sensor project : final report, September 2004.  

SciTech Connect (OSTI)

This report (1) summarizes the overall design of the Advanced Exterior Sensor (AES) system to include detailed descriptions of system components, (2) describes the work accomplished throughout FY04 to evaluate the current health of the original prototype and to return it to operation, (3) describes the status of the AES and the AES project as of September 2004, and (4) details activities planned to complete modernization of the system to include development and testing of the second-generation AES prototype.

Ashby, M. Rodema

2004-12-01T23:59:59.000Z

372

Final Environmental Assessment for the Y-12 Steam Plant Life Extenstion Project - Steam Plant Replacement Subproject  

Broader source: Energy.gov (indexed) [DOE]

93 93 Final Environmental Assessment for the Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject U.S. Department of Energy National Nuclear Security Administration August 2007 Final Y-12 Steam Plant Life Extension Project - Steam Plant Replacement Subproject - August 2007 i TABLE OF CONTENTS List of Acronyms and Abbreviations............................................................................................. vi Chemicals and Units of Measure ................................................................................................. ix Conversion Chart ......................................................................................................................... xi Metric Prefixes .............................................................................................................................xii

373

Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan  

SciTech Connect (OSTI)

The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility.

GREAGER, T.M.

2000-12-06T23:59:59.000Z

374

Final Scientifc Report - Hydrogen Education State Partnership Project  

SciTech Connect (OSTI)

Under the leadership of the Department of Energy Hydrogen and Fuel Cells program, Clean Energy States Alliance (CESA) educated and worked with state leaders to encourage wider deployment of fuel cell and hydrogen technologies. Through outreach to state policymakers, legislative leaders, clean energy funds, energy agencies, and public utility commissions, CESA worked to accomplish the following objectives of this project: 1. Provide information and technical assistance to state policy leaders and state renewable energy programs in the development of effective hydrogen fuel cell programs. 2. Identify and foster hydrogen program best practices. 3. Identify and promote strategic opportunities for states and the Department of Energy (DOE) to advance hydrogen technology deployment through partnerships, collaboration, and targeted activities. Over the three years of this project, CESA, with our partner National Conference of State Legislatures (NCSL), was able to provide credible information on fuel cell policies, finance, and technical assistance to hundreds of state officials and other stakeholders. CESA worked with its membership network to effectively educate state clean energy policymakers, program managers, and decision makers about fuel cell and hydrogen technologies and the efforts by states to advance those technologies. With the assistance of NCSL, CESA gained access to an effective forum for outreach and communication with state legislators from all 50 states on hydrogen issues and policies. This project worked to educate policymakers and stakeholders with the potential to develop and deploy stationary and portable fuel cell technologies.

Leon, Warren

2012-02-03T23:59:59.000Z

375

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

376

Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project  

SciTech Connect (OSTI)

The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: �¢���¢ Increasing safety at Boulder Canyon Hydro �¢���¢ Increasing protection of the Boulder Creek environment �¢���¢ Modernizing and integrating control equipment into Boulder�¢����s municipal water supply system, and �¢���¢ Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to

Joe Taddeucci, P E

2013-03-29T23:59:59.000Z

377

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada  

Broader source: Energy.gov [DOE]

This EIS, being prepared jointly by DOE’s Western Area Power Administration and the Department of the Interior’s Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project.

378

Electric Transmission Line Flashover Prediction System  

E-Print Network [OSTI]

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

379

Final Independent External Peer Review Report for the Savannah Harbor Expansion Project  

E-Print Network [OSTI]

for the Savannah Harbor Expansion Project General Reevaluation Report EXECUTIVE SUMMARY Savannah Harbor is a deep and 600 feet wide from deep water in the ocean (River Mile 11.4B) to the channel between the jettiesFinal Independent External Peer Review Report for the Savannah Harbor Expansion Project General

US Army Corps of Engineers

380

Final Map Draft Comparison Report WIND ENERGY RESOURCE MODELING AND MEASUREMENT PROJECT  

E-Print Network [OSTI]

II Final Map Draft Comparison Report #12;WIND ENERGY RESOURCE MODELING AND MEASUREMENT PROJECT Tel: 978-749-9591 Fax: 978-749-9713 mbrower@awstruewind.com August 10, 2004 #12;2 WIND ENERGY RESOURCE issues. 1 Background In Task 2 of the project, five promising areas of the state for wind energy

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Technology and Education: Putting it in context A summary of the final Capital Research Project report  

E-Print Network [OSTI]

Technology and Education: Putting it in context A summary of the final Capital Research Project-00593093,version1-13May2011 #12;1 Box 1: Capital Project Capital (Curriculum and Pedagogy in Technology media and research claims such as these about the educational value of new technologies. But often

Paris-Sud XI, Université de

382

LIMB Demonstration Project Extension and Coolside Demonstration. [Final report  

SciTech Connect (OSTI)

This report presents results from the limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. LIMB is a furnace sorbent injection technology designed for the reduction of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions from coal-fired utility boilers. The testing was conducted on the 105 Mwe, coal-fired, Unit 4 boiler at Ohio Edison`s Edgewater Station in Lorain, Ohio. In addition to the LIMB Extension activities, the overall project included demonstration of the Coolside process for S0{sub 2} removal for which a separate report has been issued. The primary purpose of the DOE LIMB Extension testing, was to demonstrate the generic applicability of LIMB technology. The program sought to characterize the S0{sub 2} emissions that result when various calcium-based sorbents are injected into the furnace, while burning coals having sulfur content ranging from 1.6 to 3.8 weight percent. The four sorbents used included calcitic limestone, dolomitic hydrated lime, calcitic hydrated lime, and calcitic hydrated lime with a small amount of added calcium lignosulfonate. The results include those obtained for the various coal/sorbent combinations and the effects of the LIMB process on boiler and plant operations.

Goots, T.R.; DePero, M.J.; Nolan, P.S.

1992-11-10T23:59:59.000Z

383

Final Test and Evaluation Results from the Solar Two Project  

SciTech Connect (OSTI)

Solar Two was a collaborative, cost-shared project between 11 U. S. industry and utility partners and the U. S. Department of Energy to validate molten-salt power tower technology. The Solar Two plant, located east of Barstow, CA, comprised 1926 heliostats, a receiver, a thermal storage system, a steam generation system, and steam-turbine power block. Molten nitrate salt was used as the heat transfer fluid and storage media. The steam generator powered a 10-MWe (megawatt electric), conventional Rankine cycle turbine. Solar Two operated from June 1996 to April 1999. The major objective of the test and evaluation phase of the project was to validate the technical characteristics of a molten salt power tower. This report describes the significant results from the test and evaluation activities, the operating experience of each major system, and overall plant performance. Tests were conducted to measure the power output (MW) of the each major system, the efficiencies of the heliostat, receiver, thermal storage, and electric power generation systems and the daily energy collected, daily thermal-to-electric conversion, and daily parasitic energy consumption. Also included are detailed test and evaluation reports.

BRADSHAW, ROBERT W.; DAWSON, DANIEL B.; DE LA ROSA, WILFREDO; GILBERT, ROCKWELL; GOODS, STEVEN H.; HALE, MARY JANE; JACOBS, PETER; JONES, SCOTT A.; KOLB, GREGORY J.; PACHECO, JAMES E.; PRAIRIE, MICHAEL R.; REILLY, HUGH E.; SHOWALTER, STEVEN K.; VANT-HULL, LORIN L.

2002-01-01T23:59:59.000Z

384

EIS-0395: Final Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Impact Statement EIS-0395: Final Environmental Impact Statement San Luis Rio Colorado Project The proposed transmission line would originate at the proposed San Luis Rio...

385

EIS-0447: EPA Notice of Availability Final Environmental Impact...  

Energy Savers [EERE]

of Availability Final Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of the Champlain Hudson...

386

EIS-0317-S1: Final Supplemental Environmental Impact Statement...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0317-S1: Final Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power Administration is proposing to build a new...

387

EA-1731: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Assessment EA-1731: Final Environmental Assessment Walla Walla-Tucannon River Transmission Line Rebuild Project, Walla Walla and Columbia Counties, Washington This...

388

EA-1960: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada The Bureau of Land Management, with Western Area...

389

Microsoft Word - DOE Produced Water Project - Final Report 2.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Annual Technical Progress Report Annual Technical Progress Report October 1, 2005 to March 31, 2006 DOE Award No. 41906 Use of Produced Water in Recirculating Cooling Systems at Power Generating Facilities Deliverable Number 11 Kent Zammit, EPRI Project Manager Electric Power Research Institute, Inc. 3412 Hillview Ave. Palo Alto, CA 94304-13952 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe

390

North Stanley Polymer Demonstration Project. Final summary report  

SciTech Connect (OSTI)

In February 1976, a fresh water preflush was injected into the North Stanley Polymer Demonstration Project, followed by a polymer solution until June 1977 which was chased by a fresh water after flush. A subsequent injection of produced water has been resumed to complete the injection program. Efforts were made to accelerate the change in injection profiles and to decrease per well injection rates by Channelblock treatments and by reducing the injection plant discharge pressures. Total oil production peaked at 660 BPD in January 1977. It slowly declined the remainder of the year to 637 BPD. Subsequent to March 1978, oil production has declined more rapidly and currently the rate of decline is 6.25% per year. As of January 1, 1980, the cumulative production since July 1, 1975 is as follows: (1) gross oil 923,574 barrels; (2) tertiary oil 144,974 barrels; and (3) water produced 57,854,282 barrels.

Upton, J.E.

1980-05-01T23:59:59.000Z

391

Decontamination and decommissioning of the Experimental Boiling Water Reactor (EBWR): Project final report, Argonne National Laboratory  

SciTech Connect (OSTI)

The Final Report for the Decontamination and Decommissioning (D&D) of the Argonne National Laboratory - East (ANL-E) Experimental Boiling Water Reactor (EBWR) facility contains the descriptions and evaluations of the activities and the results of the EBWR D&D project. It provides the following information: (1) An overall description of the ANL-E site and EBWR facility. (2) The history of the EBWR facility. (3) A description of the D&D activities conducted during the EBWR project. (4) A summary of the final status of the facility, including the final and confirmation surveys. (5) A summary of the final cost, schedule, and personnel exposure associated with the project, including a summary of the total waste generated. This project report covers the entire EBWR D&D project, from the initiation of Phase I activities to final project closeout. After the confirmation survey, the EBWR facility was released as a {open_quotes}Radiologically Controlled Area,{close_quotes} noting residual elevated activity remains in inaccessible areas. However, exposure levels in accessible areas are at background levels. Personnel working in accessible areas do not need Radiation Work Permits, radiation monitors, or other radiological controls. Planned use for the containment structure is as an interim transuranic waste storage facility (after conversion).

Fellhauer, C.R.; Boing, L.E. [Argonne National Lab., IL (United States); Aldana, J. [NES, Inc., Danbury, CT (United States)

1997-03-01T23:59:59.000Z

392

DOE/EIS-0397: Lyle Falls Fish Passage Project Final Environmental Impact Statement (November 2008)  

Broader source: Energy.gov (indexed) [DOE]

Lyle Falls Fish Passage Project Lyle Falls Fish Passage Project Final Environmental Impact Statement DOE/EIS-0397 November 2008 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BON N E V I L L E POW E R AD M I N I S T R A T I O N DOE/BP-3957 November 2008 Lyle Falls Fish Passage Facility Lyle Falls Fish Passage Project Final Environmental Impact Statement Bonneville Power Administration Confederated Tribes and Bands of the Yakama Nation Washington Department of Fish and Wildlife U.S.D.A. Forest Service November 2008 Lyle Falls Fish Passage Facility Lyle Falls Fish Passage Project Final Environmental Impact Statement (EIS) DOE/EIS-0397

393

In-situ combustion project at Bartlett, Kansas. Final report  

SciTech Connect (OSTI)

As part of an ongoing research program for enhanced oil recovery, the Bartlesville Energy Technology Center, US Department of Energy, is in the process of developing petroleum-recovery techcniques for shallow, low-productivity, heavy-oil deposits in southeastern Kansas, southwestern Missouri and northeastern Oklahoma. Personnel at BETC designed and conducted an in-situ combustion experiment on the Link Lease in Labette County, near Bartlett, Kansas. The Nelson-McNeil calculation method was used to calculate oil recovery and predict production time for a 1.25 acre inverted five-spot. Two attempts to ignite the formation are described. The well completion methods, hydraulic fracturing, injection of air, workovers, production techniques, and well-monitoring methods of the process are described. Production results are shown for both combustion attempts. The progression of the burn and the final extent of the burn front were evaluated by the following methods: (1) controlled source audio-frequency magnetotelluric technique (CSAMT), (2) thermogravimetric analysis (TGA), (3) burn-front model, (4)geophysical log analysis, and (5) computer model study. 26 figures, 8 tables.

Miller, J.S.; Spence, K.L.

1983-04-01T23:59:59.000Z

394

Montana-to-Washington Transmission System Upgrade Project - M2W  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

an existing BPA transmission line, and the proposed addition of a new series compensation substation along other existing BPA transmission lines. To understand the potential...

395

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

the the Interior Bureau of Land Management Las Vegas Field Office Las Vegas, Nevada March 2004 Interstate Intertie Centennial Plan Environmental Assessment Harry Allen - Mead 500kV Transmission Line DOE/EA-1470 Harry Allen-Mead 500kV Transmission Line Project Harry Allen-Mead 500kV Transmission Line Environmental Assessment 1 Chapter 1 Purpose and Need 1.1 Introduction The construction of new transmission and distribution facilities is required throughout the western United States to meet the increasing demand for power as more people move to many of the fastest growing communities. According to Executive Order 13212 dated May 18, 2001, "The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people...agencies shall take appropriate actions, to the extent

396

Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project (DOE/EIS-0128) (12/3/03)  

Broader source: Energy.gov (indexed) [DOE]

2 Date: December 3, 2003 1 2 Date: December 3, 2003 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a power marketing administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi-use water projects in the western United States, including California. The Path 15 Project, located in California's western

397

Liberty-Parker No. 2 230-kV transmission line project, La Paz and Maricopa Counties, Arizona: Environmental assessment  

SciTech Connect (OSTI)

The proposed project was not found to have the potential for significant impact on the human environment. The proposed project is essentially a rebuild of an existing transmission line on an existing right-of-way (ROW) through mostly unpopulated open desert. Analysis of the proposed action and its potential effects on various environmental components showed that the project would not significantly affect climate, air quality, noise levels, topography, geology, or soils. No significant impact would occur to vegetation or wildlife as a result of the project. Visual resources will not be significantly affected, as both the existing Liberty-Parker No. 2 Transmission Line and its parallel sister No. 1 line are already present. Land ownership, land use, and socioeconomics will not be significantly affected. No significant cultural resources will be affected by the proposed project. The lines will be constructed on areas previously surveyed for cultural resources and the site density of this region is known to be very low.

Not Available

1986-09-01T23:59:59.000Z

398

Final report on LDRD project : advanced optical trigger systems.  

SciTech Connect (OSTI)

Advanced optically-activated solid-state electrical switch development at Sandia has demonstrated multi-kA/kV switching and the path for scalability to even higher current/power. Realization of this potential requires development of new optical sources/switches based on key Sandia photonic device technologies: vertical-cavity surface-emitting lasers (VCSELs) and photoconductive semiconductor switch (PCSS) devices. The key to increasing the switching capacity of PCSS devices to 5kV/5kA and higher is to distribute the current in multiple parallel line filaments triggered by an array of high-brightness line-shaped illuminators. Commercial mechanically-stacked edge-emitting lasers have been used to trigger multiple filaments, but they are difficult to scale and manufacture with the required uniformity. In VCSEL arrays, adjacent lasers utilize identical semiconductor material and are lithographically patterned to the required dimensions. We have demonstrated multiple-line filament triggering using VCSEL arrays to approximate line generation. These arrays of uncoupled circular-aperture VCSELs have fill factors ranging from 2% to 30%. Using these arrays, we have developed a better understanding of the illumination requirements for stable triggering of multiple-filament PCSS devices. Photoconductive semiconductor switch (PCSS) devices offer advantages of high voltage operation (multi-kV), optical isolation, triggering with laser pulses that cannot occur accidentally in nature, low cost, high speed, small size, and radiation hardness. PCSS devices are candidates for an assortment of potential applications that require multi-kA switching of current. The key to increasing the switching capacity of PCSS devices to 5kV/5kA and higher is to distribute the current in multiple parallel line filaments triggered by an array of high-brightness line-shaped illuminators. Commercial mechanically-stacked edge-emitting lasers have been demonstrated to trigger multiple filaments, but they are difficult to scale and manufacture with the required uniformity. As a promising alternative to multiple discrete edge-emitting lasers, a single wafer of vertical-cavity surface-emitting lasers (VCSELs) can be lithographically patterned to achieve the desired layout of parallel line-shaped emitters, in which adjacent lasers utilize identical semiconductor material and thereby achieve a degree of intrinsic optical uniformity. Under this LDRD project, we have fabricated arrays of uncoupled circular-aperture VCSELs to approximate a line-shaped illumination pattern, achieving optical fill factors ranging from 2% to 30%. We have applied these VCSEL arrays to demonstrate single and dual parallel line-filament triggering of PCSS devices. Moreover, we have developed a better understanding of the illumination requirements for stable triggering of multiple-filament PCSS devices using VCSEL arrays. We have found that reliable triggering of multiple filaments requires matching of the turn-on time of adjacent VCSEL line-shaped-arrays to within approximately 1 ns. Additionally, we discovered that reliable triggering of PCSS devices at low voltages requires more optical power than we obtained with our first generation of VCSEL arrays. A second generation of higher-power VCSEL arrays was designed and fabricated at the end of this LDRD project, and testing with PCSS devices is currently underway (as of September 2008).

Roose, Lars D.; Hadley, G. Ronald; Mar, Alan; Serkland, Darwin Keith; Geib, Kent Martin; Sullivan, Charles Thomas; Keeler, Gordon Arthur; Bauer, Thomas M. (LMATA Government Services, LLC., Albuquerque, NM); Peake, Gregory Merwin; Loubriel, Guillermo Manuel; Montano, Victoria A. (LMATA Government Services, LLC., Albuquerque, NM)

2008-09-01T23:59:59.000Z

399

The Carolina Bay Restoration Project - Final Report 2000-2006.  

SciTech Connect (OSTI)

A Wetlands Mitigation Bank was established at SRS in 1997 as a compensatory alternative for unavoidable wetland losses. Prior to restoration activities, 16 sites included in the project were surveyed for the SRS Site Use system to serve as a protective covenant. Pre-restoration monitoring ended in Fall 2000, and post restoration monitoring began in the Winter/Spring of 2001. The total interior harvest in the 16 bays after harvesting the trees was 19.6 ha. The margins in the opencanopy, pine savanna margin treatments were thinned. Margins containing areas with immature forested stands (bay 5184 and portions of bay 5011) were thinned using a mechanical shredder in November 2001. Over 126 hectares were included in the study areas (interior + margin). Planting of two tree species and the transplanting of wetland grass species was successful. From field surveys, it was estimated that approximately 2700 Nyssa sylvatica and 1900 Taxodium distichum seedlings were planted in the eight forested bays resulting in an average planting density of ? 490 stems ha-1. One hundred seedlings of each species per bay (where available) were marked to evaluate survivability and growth. Wetland grass species were transplanted from donor sites on SRS to plots that ranged in size from 100 – 300 m2, depending on wetland size. On 0.75 and 0.6 meter centers, respectively, 2198 plugs of Panicum hemitomon and 3021 plugs Leersia hexandra were transplanted. New shoots originating from the stumps were treated with a foliar herbicide (Garlon® 4) during the summer of 2001 using backpack sprayers. Preliminary information from 2000-2004 regarding the hydrologic, vegetation and faunal response to restoration is presented in this status report.

Barton, Christopher

2007-12-15T23:59:59.000Z

400

CACI: Cesium-137 Agricultural Commodities Irradiator: Final design report. Volume 1, Project summary  

SciTech Connect (OSTI)

This report provides a complete description of the final detailed design of the Cesium-137 Agricultural Commodities Irradiator (CACI). The design was developed and successfully completed by the Rocketdyne Division of Rockwell International for the US Department of Energy (DOE). The CACI project was initiated in April 1985 under DOE`s Byproducts Utilization Program, with the objectives of transferring food irradiation technology to the industry and thereby demonstrating a beneficial use for the 137 Cs nuclear by-product isotope. As designed, CACI will meet the intended requirements for research, development, and demonstration of Irradiation processing of food. Further, as shown in the safety analyses performed during the project, the design conforms to all the safety and licensing requirements set forth for the project. The original scope of the CACI project included completion of its construction. However, the project was terminated for the convenience of the government during the final design phase in February 1986 for lack of a specific site.

Subbaraman, G.; Conners, C.C.

1986-12-19T23:59:59.000Z

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

402

Blade System Design Study. Part II, final project report (GEC).  

SciTech Connect (OSTI)

As part of the U.S. Department of Energy's Low Wind Speed Turbine program, Global Energy Concepts LLC (GEC)1 has studied alternative composite materials for wind turbine blades in the multi-megawatt size range. This work in one of the Blade System Design Studies (BSDS) funded through Sandia National Laboratories. The BSDS program was conducted in two phases. In the Part I BSDS, GEC assessed candidate innovations in composite materials, manufacturing processes, and structural configurations. GEC also made recommendations for testing composite coupons, details, assemblies, and blade substructures to be carried out in the Part II study (BSDS-II). The BSDS-II contract period began in May 2003, and testing was initiated in June 2004. The current report summarizes the results from the BSDS-II test program. Composite materials evaluated include carbon fiber in both pre-impregnated and vacuum-assisted resin transfer molding (VARTM) forms. Initial thin-coupon static testing included a wide range of parameters, including variation in manufacturer, fiber tow size, fabric architecture, and resin type. A smaller set of these materials and process types was also evaluated in thin-coupon fatigue testing, and in ply-drop and ply-transition panels. The majority of materials used epoxy resin, with vinyl ester (VE) resin also used for selected cases. Late in the project, testing of unidirectional fiberglass was added to provide an updated baseline against which to evaluate the carbon material performance. Numerous unidirectional carbon fabrics were considered for evaluation with VARTM infusion. All but one fabric style considered suffered either from poor infusibility or waviness of fibers combined with poor compaction. The exception was a triaxial carbon-fiberglass fabric produced by SAERTEX. This fabric became the primary choice for infused articles throughout the test program. The generally positive results obtained in this program for the SAERTEX material have led to its being used in innovative prototype blades of 9-m and 30-m length, as well as other non-wind related structures.

Griffin, Dayton A. (DNV Global Energy Concepts Inc., Seattle, WA)

2009-05-01T23:59:59.000Z

403

Mississippi Ethanol Gasification Project, Final Scientific / Technical Report  

SciTech Connect (OSTI)

The Mississippi Ethanol (ME) Project is a comprehensive effort to develop the conversion of biomass to ethanol utilizing a proprietary gasification reactor technology developed by Mississippi Ethanol, LLC. Tasks were split between operation of a 1/10 scale unit at the Diagnostic Instrumentation and Analysis Laboratory (DIAL) of Mississippi State University (MSU) and the construction, development, and operation of a full scale pilot unit located at the ME facility in Winona, Mississippi. In addition to characterization of the ME reactor gasification system, other areas considered critical to the operational and economic viability of the overall ME concept were evaluated. These areas include syngas cleanup, biological conversion of syngas to alcohol, and effects of gasification scale factors. Characterization of run data from the Pre-Pilot and Pilot Units has allowed development of the factors necessary for scale-up from the small unit to the larger unit. This scale range is approximately a factor of 10. Particulate and tar sampling gave order of magnitude values for preliminary design calculations. In addition, sampling values collected downstream of the ash removal system show significant reductions in observed loadings. These loading values indicate that acceptable particulate and tar loading rates could be attained with standard equipment additions to the existing configurations. Overall operation both the Pre-Pilot and Pilot Units proceeded very well. The Pilot Unit was operated as a system, from wood receiving to gas flaring, several times and these runs were used to address possible production-scale concerns. Among these, a pressure feed system was developed to allow feed of material against gasifier system pressure with little or no purge requirements. Similarly, a water wash system, with continuous ash collection, was developed, installed, and tested. Development of a biological system for alcohol production was conducted at Mississippi State University with much progress. However, the current state of biological technology is not deemed to be ready commercially. A preliminary estimate of capital and operating costs of a 12000 gallon per day gasification/biological facility was developed for comparison purposes. In addition, during the biological organism screening and testing, some possible alternative products were identified. One such possibility is the biological production of bio-diesel. Additional research is necessary for further evaluation of all of the biological concepts.

Pearson, Larry, E.

2007-04-30T23:59:59.000Z

404

W-519 Sagebrush Mitigation Project FY-2004 Final Review and Status  

SciTech Connect (OSTI)

This report summarizes activities conducted as mitigation for loss of sagebrush-steppe habitats due to Project W-519, the construction of the infrastructure for the Tank Waste Remediation System Vitrification Plant. The focus of this report is to provide a review and final status of mitigation actions performed through FY2004. Data collected since FY1999 have been included where appropriate. The Mitigation Action Plan (MAP) for Project W-519 prescribed three general actions to be performed as mitigation for the disturbance of approximately 40 ha (100 acres) of mature sagebrush-steppe habitat. These actions included: (1) transplanting approximately 130,000 sagebrush seedlings on the Fitzner-Eberhardt Arid Lands Ecology Reserve (ALE); (2) rectification of the new transmission line corridor via seeding with native grasses and sagebrush; and (3) research on native plant species with a goal of increasing species diversity in future mitigation or restoration actions. Nearly 130,000 Wyoming big sagebrush seedlings where planted on ALE during FY2000 and FY2001. About 39,000 of those seedlings were burned during the 24-Command Fire of June 2000. The surviving and subsequent replanting has resulted in about 91,000 seedlings that were planted across four general areas on ALE. A 50% survival rate at any monitoring period was defined as the performance standard in the MAP for this project. Data collected in 2004 indicate that of the over 5000 monitored plants, 51.1% are still alive, and of those the majority are thriving and blooming. These results support the potential for natural recruitment and the ultimate goal of wildlife habitat replacement. Thus, the basic performance standard for sagebrush survival within the habitat compensation planting has been met. Monitoring activities conducted in 2004 indicate considerable variation in seedling survival depending on the type of plant material, site conditions, and to a lesser extent, treatments performed at the time of planting. The principle findings include: (1) a clear indication that in most settings, bare-root seedling survival is considerably higher than tubling survival; (2) we can expect low plant survival at sites with a high cover of large native bunchgrasses--especially bluebunch wheatgrass; (3) mycorrhizal root treatments appeared to increase growth and survival at the Coppice Dune and 98-Burn Undisturbed sites, but appeared to have little effect at the 98-Burn Disturbed, 111-Road Sitanion, or Cold Creek sites; (4) use of a hydrogel dip at planting increases survival of bare-root plants compared to dipping roots in plain water; (5) reducing leaf area via clipping after planting did not increase survival of bare-root plants; (6) seedlings planted on a south-aspect hillside at the Lower Cold Creek planting area had higher survival than seedlings planted on the hilltop or northern-aspects although these survival rates were lower than the survival rate down on the flats at this same location. Rectification of the transmission line corridor occurred in early March 2001, with the broadcast seeding of Sandberg's bluegrass and sagebrush. Success criteria for this site-of-disturbance rectification required a grass establishment after four years with greater than 25% total canopy cover with 60% of the plant cover from planted species (DOE 1998). This planting met the total canopy criterion but failed the criterion of 60% relative coverage of planted species. Although the performance standard was not met, the planting is not necessarily a failure; the communities on the tower pads appear to be developing toward the desired end state. We feel that there are no reasonable mitigative actions that can be taken at this time that would significantly alter or speed up the plant community development on these sites. In fact, most options, such as overseeding, may cause damage to the currently establishing communities on those sites.

Durham, Robin E.; Sackschewsky, Michael R.

2004-09-30T23:59:59.000Z

405

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Broader source: Energy.gov (indexed) [DOE]

Statement - Appendices Statement - Appendices DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement DOE/EIS-0285 APPENDICES May 2000 Table of Contents Appendix A - Public Involvement: Publications Appendix B - Biological Weed Control Agents Appendix C - Bonneville Pesticide Applicator Certification Plan Appendix D - Sample Educational Information Appendix E - Clearance Criteria Appendix F - FS Mitigation Measures and Background Appendix G - BLM Mitigation Measures and Background Appendix H - Herbicide Fact Sheets 2,4-D Azafenidin Bromacil Chlorsulfuron Clopyralid Dicamba Dichlobenil Diuron Fosamine Ammonium Glyphosate Halosulfuron-methyl Hexazinone Imazapyr Isoxaben Mefluidide Metsulfuron-methyl

406

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov (indexed) [DOE]

2 2 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 2: Comment and Response Document U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Comment and Response Document Imperial-Mexicali FEIS iii December 2004 CONTENTS NOTATION .......................................................................................................................... v ENGLISH/METRIC AND METRIC/ENGLISH EQUIVALENTS..................................... ix 1 PUBLIC REVIEW OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT ................................................................................................................ 1-1 1.1 Overview of the Public Review Process

407

Identification of ions near HVDC (high-voltage direct-current) transmission lines: Final report  

SciTech Connect (OSTI)

Positive and negative ion species were identified and studied at two separate field sites and one laboratory site. The first field study was conducted under an operating HVDC transmission line. The second was near a HVDC test line and measurements were performed with the line in both an energized and de-energized state. During clear, sunny days HSO/sub 4//sup /minus///center dot/H/sub 2/SO/sub 4/ was observed to be the dominant negative ion in the natural ion spectrum. At night, however, HSO/sub 4//sup /minus// core ions virtually disappeared, and were replaced by NO/sub 3//sup /minus// core ions and their first nitric acid cluster. Both negative spectra also typically contained lesser concentrations of the malonate ion. The transmission line negative spectra were similar but were typically dominated by the NO/sub 3//sup /minus// core ions during both day and night. The positive ions observed under HVDC lines were typically either NH/sub 4//sup +/ or C/sub 5/H/sub 6/N/sup +/, which reacted with higher proton affinity species (such as methylpyridines, trimethylamine and quinoline) farther from or in the absence of the transmission line. The observed differences between natural and anthropogenic ion spectra near HVDC lines are attributed primarily to a shortening of ion lifetimes by the strong electric field associated with the HVDC lines. One exception is the production of potassium and probably sodium based ions from the decomposition of insects in transmission line coronas. 22 refs., 29 figs.

Eisele, F.L.

1989-05-01T23:59:59.000Z

408

EA-1602: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1602: Final Environmental Assessment EA-1602: Final Environmental Assessment EA-1602: Final Environmental Assessment Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water quality strategy to protect and improve water quality for its customers, the Contra Costa Water District (CCWD) is implementing the Alternative Intake Project (AIP). This Final Environmental Assessment (EA) evaluates Western Area Power Administration's (Western's) Transmission Line and Interconnection (Proposed Action) for the AIP. DOE/EA-1602, Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (November 2008) More Documents & Publications EA-1602: Finding of No Significant Impact EIS-0404: Final Environmental Impact Statement EA-1411: Finding of No Significant Impact

409

EIS-0256: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

256: Final Environmental Impact Statement 256: Final Environmental Impact Statement EIS-0256: Final Environmental Impact Statement Sierra Pacific Power Company Alturas Transmission Line Project This Environmental Impact Report/Environmental Impact Statement (EIR/S) describes the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power. This volume contains the Executive Summary. Environmental Impact Statement for Sierra Pacific Power Company Alturas Transmission Line Project, DOE/EIS-0256 (November 1995)

410

Microsoft Word - NEPA_CX_FINAL_Lancaster_Line_and_Load_Project_06-15-2012.docx  

Broader source: Energy.gov (indexed) [DOE]

8, 2012 8, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Charla Burke Project Manager - TEP-TPP-1 Proposed Action: Lancaster Line and Load Project - LO311 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities B4.7 Fiber optic cable Location: Lancaster Substation, Kootenai County, Idaho; approximately 2.2 miles southwest of Rathdrum, Idaho, (Township 51 North, Range 5 West, Section 11). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to add equipment to its existing Lancaster Substation, replace one transmission structure, modify one existing structure, and replace existing

411

(DOE/EIS-0128): Mitigation Action Plan for the Los Banos-Gates Transmission project 1/28/03  

Broader source: Energy.gov (indexed) [DOE]

Date: ____________________________ 1 Date: ____________________________ 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a Power Marketing Administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi- use water projects in the western United States, including California. The

412

"FutureGen 2.0 Project Final Environmental Impact Statement Volume II"  

Broader source: Energy.gov (indexed) [DOE]

APPENDIX F APPENDIX F Cultural Surveys F1 - Phase I - Site Characterization Locale Survey F2 - Phase I - Meredosia Energy Center Survey F3 - Phase I - Bluff Area Pipeline Right-of-Way Segment Survey F4 - Phase I - Soil Gas Monitoring Locations Survey for the Final Environmental Impact Statement FutureGen 2.0 Project Meredosia, Illinois (Morgan County) Note: This appendix was updated for the Final EIS.

413

Final Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site  

Broader source: Energy.gov (indexed) [DOE]

58 58 Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Sites Final February 2003 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract No. DE-AC13-02GJ79491 DOE Grand Junction Office EA of Ground Water Compliance at the Slick Rock Sites February 2003 Final Page iii Contents Page Acronyms and Abbreviations...........................................................................................................v Executive Summary...................................................................................................................... vii 1.0 Introduction.............................................................................................................................1

414

Western Greenbrier Co-Production Demonstration Project Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

WESTERN WESTERN GREENBRIER CO-PRODUCTION DEMONSTRATION PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 1 OF 3 DOE / EIS-0361 U.S. Department of Energy Office of Fossil Energy National Energy Technology Laboratory NOVEMBER 2007 COVER SHEET Responsible Agency: U.S. Department of Energy Title: Western Greenbrier Co-Production Demonstration Project, Final Environmental Impact Statement (DOE/EIS-0361) Location: Rainelle, West Virginia Contact: For further information about this Environmental Impact Statement, contact: For general information on the Department of Energy's process for implementing the National Environmental Policy Act, contact: Roy Spears, Document Manager National Energy Technology Laboratory U.S. Department of Energy 3610 Collins Ferry Road

415

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

8 8 U.S. Department of Energy Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project Final Environmental Impact Statement November 2002 U.S. Department of Energy National Energy Technology Laboratory COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Kentucky Pioneer Integrated Gasification Combined Cycle (IGCC) Demonstration Project Final Environmental Impact Statement (EIS) (DOE/EIS-0318) Location: Clark County, Kentucky Contacts: For further information on this environmental For further information on the DOE National impact statement (EIS), call: Environmental Policy Act (NEPA) process, call: 1-800-432-8330 ext. 5460 1-800-472-2756 or contact: or contact: Mr. Roy Spears Ms. Carol Borgstrom

416

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft Envrionmental Impact Statement(02/2002)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Draft Environmental Impact Statement (DOE/EIS -0332) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior: U.S. Fish and Wildlife Service, Bureau of Land Management, and Bureau of Indian Affairs. Department of Army: Corps of Engineers. States Involved: Oregon and Washington Abstract: Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt- transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about

417

OE Issues Notice of Intent to Prepare an Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project  

Broader source: Energy.gov [DOE]

On December 21, 2012, DOE’s Office of Electricity Delivery and Energy Reliability (OE) issued a Notice of Intent (NOI) to Prepare an Environmental Impact Statement (EIS) for the Plains & Eastern Clean Line Transmission Project on behalf of the Department and Southwestern Power Administration

418

SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 1. Project summary  

SciTech Connect (OSTI)

A summary of the Solar Controlled Environment Agriculture Project is presented. The design of the greenhouses include transparent double pane glass roof with channels for fluid between the panes, inner pane tinted and double pane extruded acrylic aluminized mylar shade and diffuser. Solar energy technologies provide power for water desalination, for pumping irrigation water, and for cooling and heating the controlled environment space so that crops can grow in arid lands. The project is a joint effort between the United States and Saudi Arabia. (BCS)

Not Available

1985-12-30T23:59:59.000Z

419

Microsoft Word - Transmission - DOE lead agency NOPR - Final EEI comments 2-24-12  

Broader source: Energy.gov (indexed) [DOE]

February 24, 2012 February 24, 2012 Mr. Brian Mills Office of Electricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Submitted via email to: Brian.Mills@hq.doe.gov Re: Coordination of Federal Authorizations for Electric Transmission Facilities, Notice of Proposed Rulemaking, RIN 1901-AB18, 76 Fed. Reg. 77432 (Dec. 13, 2011) Dear Mr. Mills: I. INTRODUCTION The Edison Electric Institute (EEI) is pleased to provide these comments to the Department of Energy (DOE) in response to the above-referenced notice of proposed rulemaking (NOPR) for implementing Federal Power Act (FPA) section 216(h), which was enacted as part of section 1221 of the Energy Policy Act of 2005 (EPAct). The NOPR proposes to amend, and incorporates comments received in response to, DOE's

420

Transmissive infrared frequency selective surfaces and infrared antennas : final report for LDRD 105749.  

SciTech Connect (OSTI)

Plasmonic structures open up new opportunities in photonic devices, sometimes offering an alternate method to perform a function and sometimes offering capabilities not possible with standard optics. In this LDRD we successfully demonstrated metal coatings on optical surfaces that do not adversely affect the transmission of those surfaces at the design frequency. This technology could be applied as an RF noise blocking layer across an optical aperture or as a method to apply an electric field to an active electro-optic device without affecting optical performance. We also demonstrated thin optical absorbers using similar patterned surfaces. These infrared optical antennas show promise as a method to improve performance in mercury cadmium telluride detectors. Furthermore, these structures could be coupled with other components to lead to direct rectification of infrared radiation. This possibility leads to a new method for infrared detection and energy harvesting of infrared radiation.

Wendt, Joel Robert; Hadley, G. Ronald; Samora, Sally; Loui, Hung; Cruz-Cabrera, Alvaro Augusto; Davids, Paul; Kemme, Shanalyn A.; Basilio, Lorena I.; Johnson, William Arthur; Peters, David William

2009-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final  

SciTech Connect (OSTI)

This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.

None

1999-02-01T23:59:59.000Z

422

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana  

Broader source: Energy.gov [DOE]

This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations.

423

SOLERAS - Photovoltaic Power Systems Project. Rural solar applications. Final report: project summary  

SciTech Connect (OSTI)

The Saudi Solar Village Project photovoltaic system is described, consisting of 160 arrays, a computerized control system, 1100 kW of electrical storage in lead-acid batteries, and an automatic weather data gathering system. Satisfactory overall system performance is reported. Performance degradation due to dust on the array lenses was determined. Field operational problems are discussed. (LEW)

Not Available

1985-01-01T23:59:59.000Z

424

"FutureGen 2.0 Project Final Environmental Impact Statement Summary"  

Broader source: Energy.gov (indexed) [DOE]

COVER SHEET COVER SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Cooperating Agencies: None Title: Final Environmental Impact Statement for the FutureGen 2.0 Project (DOE/EIS-0460) Location: Morgan County, Illinois Contact: For further information about this Environmental Impact Statement, contact: For general information on the DOE process for implementing the National Environmental Policy Act,

425

Hanford Sludge Treatment Project 105-KW Final Safety Analysis Report Review, August 2011  

Broader source: Energy.gov (indexed) [DOE]

Site Visit Report Site Visit Report Sludge Treatment Project 105-KW Final Safety Analysis Report Review May 2011 August 2011 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Introduction ............................................................................................................................................ 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 1 4.0 Results .................................................................................................................................................... 2

426

Hanford Sludge Treatment Project 105-KW Final Safety Analysis Report Review, August 2011  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Visit Report Site Visit Report Sludge Treatment Project 105-KW Final Safety Analysis Report Review May 2011 August 2011 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Introduction ............................................................................................................................................ 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 1 4.0 Results .................................................................................................................................................... 2

427

Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report  

SciTech Connect (OSTI)

This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

Wight, R.H.

1997-05-30T23:59:59.000Z

428

FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development on the Population Biology  

E-Print Network [OSTI]

Collaborative Abby Arnold, Executive Director, American Wind Wildlife Institute,aarnold@awwi.org, 202- 535-7800 (x105) Taber D. Allison, Director of Research and Evaluation, American Wind Wildlife Institutei FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development

Sandercock, Brett K.

429

FINAL YEAR PROJECT TECHNICAL PAPER PAGE 2222 DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING  

E-Print Network [OSTI]

Interface". · WWW is the abbreviation of "World Wide Web". · RCS is the abbreviation of "Revision Control THE UNIVERSITY OF HONG KONG 1. INTRODUCTION This document is the final year project technical paper produced " own achievement. In this document, the system developed by the team will not be described in details

Cheng, Reynold Cheng Chun

430

Spent nuclear fuel project - criteria document spent nuclear fuel final safety analysis report  

SciTech Connect (OSTI)

The criteria document provides the criteria and planning guidance for developing the Spent Nuclear Fuel (SNF) Final Safety Analysis Report (FSAR). This FSAR will support the US Department of Energy, Richland Operations Office decision to authorize the procurement, installation, installation acceptance testing, startup, and operation of the SNF Project facilities (K Basins, Cold Vacuum Drying Facility, and Canister Storage Building).

MORGAN, R.G.

1999-02-23T23:59:59.000Z

431

I'SOT Canby District Heating Project, Modoc County, California Final Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

March 17, 2003 Dear Stakeholder: SUBJECT: NOTICE OF AVAILABILITY OF FINAL ENVIRONMENTAL ASSESSMENT OF THE PROPOSED IN SEARCH OF TRUTH CANBY DISTRICT HEATING PROJECT, MODOC COUNTY, CALIFORNIA (DOE/EA 1460) The U.S. Department of Energy's (DOE's) Golden Field Office (GO) has issued the final Environmental Assessment (EA) and a Finding of No Significant Impact (FONSI) for the subject geothermal project. These documents are available online in the GO electronic reading room at www.golden.doe.gov. Copies of the documents can be obtained by contacting Steve Blazek at the address and telephone number listed below. GO has prepared the final EA and FONSI in accordance with the National Environmental Policy Act (NEPA) and DOE's NEPA implementation guidance.

432

Joint HVAC Transmission EMF Environmental Study : Final Report on Experiment 1.  

SciTech Connect (OSTI)

This document describes the rationale, procedures, and results of a carefully controlled study conducted to establish whether chronic exposure of female (ewe) Suffolk lambs to the environment of a 500-kV 60-Hz transmission line would affect various characteristics of growth, endocrine function, and reproductive development. This experiment used identical housing and management schemes for control and line-exposed ewes, thus minimizing these factors as contributors to between-group experimental error. Further, throughout the 10-month duration of this study, changes in electric and magnetic fields, audible noise, and weather conditions were monitored continuously by a computerized system. Such measurements provided the opportunity to identify any relationship between environmental factors and biological responses. Because of reports in the literature that electric and magnetic fields alter concentrations of melatonin in laboratory animals, the primary objective of this study was to ascertain whether a similar effect occurs in lambs exposed to a 500-kV a-c line in a natural setting. In addition, onset of puberty, changes in body weight, wool growth, and behavior were monitored. To determine whether the environment of a 500-kV line caused stress in the study animals, serum levels of cortisol were measured. The study was conducted at Bonneville Power Administration`s Ostrander Substation near Estacada, Oregon.

United States. Bonneville Power Administration; Oregon Regional Primate Research Center

1992-05-01T23:59:59.000Z

433

Tazimina hydroelectric project, Iliamna, Alaska. Final technical and construction cost report  

SciTech Connect (OSTI)

The Iliamna-Newhalen-Nondalton Electric Cooperative (INNEC) provides electrical power to three communities of the same names. These communities are located near the north shore of Iliamna Lake in south-central Alaska approximately 175 miles southwest of Anchorage. A hydroelectric project was constructed for these communities, starting in the spring of 1996 and ending in the spring of 1998. The project site is on the Tazimina River about 12 miles northeast of Iliamna Lake. The taximina River flows west from the Aleutian Range. The project site is at Tazimina Falls about 9 miles upstream of the confluence of the Tazimina River and the Newhalen River. The project has an installed capacity of 824 kilowatts (kW) and is expandable to 1.5 megawatts (MW). The project is run-of-the-river (no storage) and uses the approximately 100 feet of natural head provided by the falls. The project features include a channel control sill, intake structure, penstock, underground powerhouse, tailrace, surface control building, buried transmission line and communication cable, and access road.

NONE

1998-08-01T23:59:59.000Z

434

EA-1982: Parker-Davis Transmission System Programmatic Operations and Maintenance Project; Arizona, California, and Nevada  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

435

Subsistence restoration project: Food safety testing. Exxon Valdez Oil Spill Restoration Project. Final report restoration project 94279  

SciTech Connect (OSTI)

The goal of this project was to restore the confidence of subsistence users in their abilities to determine the safety of their resources. Methods included community meetings, collection and testing of subsistence resources samples for hydrocarbon contamination, accompanying community representatives on tours of the laboratory where tests were conducted and informational newsletters. Over the two years of the project combined, 228 composite samples of edible tissues from shellfish were tested. The bile of forty rockfish, six sockeye salmon, twelve seals, twenty-three ducks were tested for the presence of hydrocarbon metabolites. Edible tissue (blubber) from seals was also tested. Generally, the tests showed such low levels of hydrocarbons and their metabolites, as to be within the test`s margin of error. The project was partly successful in disseminating the subsistence food safety advice of the Oil Spill Health Task Force and in improving the level of trust in the results of hydrocarbon tests on the resources.

Miraglia, R.A.; Chartrand, A.W.

1997-05-01T23:59:59.000Z

436

Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report  

SciTech Connect (OSTI)

This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

John Saurwein

2011-07-15T23:59:59.000Z

437

Final Project Report for project titled "Fluoroalkylphosphonic-acid-based proton conductors"  

SciTech Connect (OSTI)

The overall objective of this research was to create new proton-conducting polymer electrolytes for use in energy conversion devices including hydrogen fuel cells that could operate at high temperatures (95-130 C) and under low relative humidity (< 50% RH) conditions. The new polymers were based on the fluoroalkylphosphonic and phosphinic acid (FPA) groups (see illustration below) which offer prospects for rapid proton transport by a proton-hopping mechanism similar to that which operates in phosphoric acid, a well-known proton-transporting electrolyte that is used in a class of hydrogen fuel cells that work well under the conditions noted above and are already commercially successful. The two specific project objectives were as follows: (1) synthesize and characterize new proton-conducting electrolytes based on the fluoroalkylphosphonic and phosphinic acid (FPA) functional groups; and (2) create and apply new computer models to study protonic conduction in FPA-based electrolytes. The project was successful in creating the desired polymer electrolytes and also a series of molecular model compounds which were used to study proton transport in FPA electrolytes in general. Computer models were created to study both structure and proton-transport dynamics in the electrolytes, particularly the molecular model compounds. Rapid proton transport by a hopping mechanism was found in many of the model compounds and correlations with transport rates with molecular structure were identified. Several polymeric analogs of FPA model compounds were prepared and studied, however FPA-based polymeric materials having very high protonic conductivities under either wet or dry conditions were not obtained. Several possible reasons for the failure of polymeric materials to exhibit the expected high protonic conductivities were identified, including a failure of the polymers to adopt the phase-separated secondary structure/morphology necessary for high proton conductivity, and an unexpected polymer crosslinking effect of acidic groups having two P-OH groups. The project has lent insight into how FPA groups transport protons in both liquid and polymeric forms, which provides guidance to future efforts to design and prepare future generations of proton-conducting polymer electrolytes for hydrogen fuel cells and other types of electrochemical energy conversion and storage devices.

Stephen Creager

2011-12-08T23:59:59.000Z

438

Analysis of dc harmonics using the three-pulse model for the intermountain power project HVDC transmission  

SciTech Connect (OSTI)

The harmonic analysis of the dc-side of an HVDC line transmission requires realistic models of the converters, the dc line, and other relevant equipment. These models must include all important paths for harmonic current, and appropriate sources of harmonic voltage generation. The classical converter modeling technique has been demonstrated to be insufficient in field measurements and analysis of the harmonic spectra found on recent HVDC line transmission. For this reason, a new model of the converter bridge which takes into account the major stray capacitances in the converter (the three-pulse model) has been developed, and is described in detail elsewhere. This paper presents comparisons between the classical and three-pulse calculations for the Intermountain Power Project (IPP) HVDC transmission. The calculation results from the three-pulse model agree favorably with the harmonics found in field measurements.

Dickmander, D.L.; Peterson, K.J.

1989-04-01T23:59:59.000Z

439

Wholesale Power and Transmission Rate Projections 1993--2014 and Historical Wholesale Power Rates 1939--1992.  

SciTech Connect (OSTI)

This document provides a range of high, medium, and low case long-term projections of Bonneville Power Administration`s (BPA) wholesale power rates and a medium case long-term projection of BPA`s wheeling rates. These projections are produced annually by BPA. BPA uses these projections in long-term marketing, resource, transmission, and financial planning assessments. BPA`s projections also are used by public utility commissions, utilities, and others for a variety of planning purposes. The analysis used for these rate projections assumes that current rate making methodologies continue into the future and are further based on certain assumptions about regional loads, extra-regional markets, the costs of resources, BPA`s financial requirements, and the capability of the region`s power plants. While these projections are intended to address the overall uncertainty in rate levels, BPA realizes that the future will not reflect any specific set of assumptions. The rate projections in this document have been prepared prior to the Draft 1993 BPA Marketing Plan, the implementation of which is almost certain to push BPA away from any set of assumptions in this document. Therefore, this document can be thought of as representing the ``old`` BPA with its products and policies. It can be viewed as a starting point or reference point to measure the impact of the ``new`` BPA with its Marketing Plan, and the broader undertaking referred to as the Competitiveness Project.

US Bonneville Power Administration

1993-11-01T23:59:59.000Z

440

EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

SciTech Connect (OSTI)

California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

2008-07-01T23:59:59.000Z

442

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

443

DOE/EA-1635: Environmental Assessment for Pre-approval Review Williston to Tioga Transmission Line Project (March 2010)  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 March 2010 Acronyms and Abbreviations °C degrees Celsius AAQS Ambient Air Quality Standards AIRFA American Indian Religious Freedom Act of 1978 amsl above mean sea level APLIC Avian Power Line Interaction Committee BEPC Basin Electric Power Cooperative BFE Base Flood Elevation BGEPA Bald and Golden Eagle Protection Act BMP best management practice CFR Code of Federal Regulations CO 2 carbon dioxide Council Advisory Council on Historic Preservation CRP Conservation Reserve Program

444

Final Project Summary Report Bechtel Nevada and Fiberchem Environmental, Inc., Cooperative Research and Technology Development Project  

SciTech Connect (OSTI)

This is a report summarizing work on a small project dedicated to adapting a new chemical sensing platform for the US Department of Energy and its customers. At the same time and in the spirit of technology transfer, FCI Environmental, Inc., would receive technical support in the form of expertise from the US Department of Energy to assist in developing this product. The sensor is a hybrid integrated-circuit, optical waveguide, chemical sensor that is patented by FCI Environmental, Inc., and manufactured under license by Texas Instruments, Inc. A down-hole penetrometer probe was designed for use in hot, 60 C, hydrocarbon-saturated, saline environment at a depth of 200 feet. The probe design includes three chemical sensing, hybrid integrated-circuits with chemical reference and measurement channels, a water seal, output electronics, and a removable measurement head for replacement in the field. A hand-held chemical detector prototype--containing a hybrid integrated-circuit chemical sensor with reference channel, user alarm, and level display--was designed and constructed, and a software interface developed to operate the hand-held sensor interfaced with a laboratory data acquisition system.

R. J. Pollina

1999-04-01T23:59:59.000Z

445

Coyote Springs Cogeneration Project - Final Environmental Impact Statement and Record of Decision (DOE/EIS-0201)  

Broader source: Energy.gov (indexed) [DOE]

Coyote Springs Cogeneration Project - Final Environmental Impact Statement Coyote Springs Cogeneration Project - Final Environmental Impact Statement Summary-1 Summary Bonneville Power Administration (BPA) is a Federal power marketing agency in the U.S. Department of Energy. BPA is considering whether to transmit (wheel) electrical power from a proposed privately-owned, gas-fired combustion turbine power generation plant in Morrow County, Oregon. The proposed power plant would have two combustion turbines that would generate 440 average megawatts (aMW) of energy when completed. The proposed plant would be built in phases. The first combustion turbine would be built as quickly as possible. Timing for the second combustion turbine is uncertain. As a Federal agency subject to the Nation Environ- mental Policy Act, BPA must complete a review of environmental impacts before it makes a

446

Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

United States. Bonneville Power Administration.

1995-09-01T23:59:59.000Z

447

Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report  

SciTech Connect (OSTI)

Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy�s Wind and Hydropower Technologies Program�s goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.

Craig W. Collar

2012-11-16T23:59:59.000Z

448

Microsoft Word - Oneida Waste to Energy Project DOE Final EA 1862  

Broader source: Energy.gov (indexed) [DOE]

ONEIDA SEVEN GENERATIONS ONEIDA SEVEN GENERATIONS CORPORATION: ENERGY RECOVERY PROJECT, GREEN BAY, WISCONSIN U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office NOVEMBER 2011 DOE/EA-1862 FINAL ENVIRONMENTAL ASSESSMENT FOR THE ONEIDA SEVEN GENERATIONS CORPORATION: ENERGY RECOVERY PROJECT, GREEN BAY, WISCONSIN U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office NOVEMBER 2011 DOE/EA-1862 DOE/EA-1862 iii November 2011 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: Environmental Assessment for Oneida Seven Generations Corporation: Energy Recovery Project, Green Bay, Wisconsin (DOE/EA-1862) CONTACT: For more information on this Environmental Assessment (EA), please contact:

449

Record of Decision for the Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements (DOE/EIS-0266) (11/20/00)  

Broader source: Energy.gov (indexed) [DOE]

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements Administrator's Record of Decision Summary The Bonneville Power Administration (BPA) has decided to execute Transmission Services Agreements (TSAs) and Power Purchase Agreements (PPAs) with Calpine Siskiyou Geothermal Partners, L.P. (Calpine) to acquire output from the Fourmile Hill Geothermal Development Project (Project). Initially, BPA will execute one or more PPAs in order to acquire up to the entire Project output. TSAs will be executed before the Project becomes operational. The United States Forest Service (Forest Service) and the Bureau of Land Management (BLM) were the joint lead Federal agencies in the preparation of

450

EIS-0332: McNary-John Day Transmission Line Project, OR  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

451

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

452

EIS-0011: New Melones 230-kV Electrical Transmission Line, Central Valley Project, California  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Western Area Power Administration prepared this statement to evaluate the environmental impacts of proposed development of an electrical transmission system for the New Melones Power Plant.

453

EIS-0330: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Final Environmental Impact Statement 0: Final Environmental Impact Statement EIS-0330: Final Environmental Impact Statement Wallula Power Project and Wallula - McNary Transmission Line Project Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed. Wallula Power Project and Wallula - McNary Transmission Line Project Final

454

Columbia River Gorge Vegetation Management Project Final Environmental Assessment DOE/EA-1162  

Broader source: Energy.gov (indexed) [DOE]

COLUMBIA COLUMBIA RIVER MANAGEMENT PR GORGE OJECT VEGETAT ON Final Environmental Assessment DO E/EA-l 162 BONNEVILLE row,. ..", ",,,,.,,0. W x ? -- -- ------ .- .-- b I . , (, I I I ( t ,1 ,0 , . ,' I , ,- , !" 1 , I I ,; ,, 1 1 I .1 . . COLUMBIA RIVER GORGE VEGETATION MANAGEMENT ENVIRONMENTAL ASSESSMENT (Hanford-Ostrander and North BonnevilI&Midway Transmission Line Rights-of-Way) Table of Contents Page . 2 3 pqose and Need Background hbfic evolvement Swq ' ' Decbions to Be Made PROPOSED A~ON AND ~~RNA~S Mtemative k No Action " Manual, Mechnical, and Biological Metbh - Ntemative W. Proposed Action- htegrated Vegetation Management ~) tih Herbicides Herbici& Meth& -. PhedActions Comparison of Mtematives ~ . . . . . . ti~D E~OW~ ~ E_O_~m .. CONSEQ~N~S Affmd Environment . Environment Consquen~ hti Use Soils Vegetation Water Resources WildlfeResources Air Quali@lGlobal Warning

455

EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service’s construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

456

Fernald Environmental Management Project Director's Final Findings & Orders, June 6, 1996  

Broader source: Energy.gov (indexed) [DOE]

. - . - ~ June 6, 1996 Re: Director's Final Findings & Orders U.S. Department of Energy Cincinnati, Ohio U.S. EPA ID No: OH6890008976 Mr. Phil Hammric U.S. Department of Energy Femald Environmental Management Project P.O. Box 389705 Cincinnati, Ohio 45239 Mr. John Bradbume Femald Environmental Restoration Corporation P.0. Box 538704 Cincinnati, Ohio 45253-8704 Dear Mr. Hammric and Mr. Bradbume: Transmitted herewith are Final Findings and Orders of the Director concrrning the matter indicated above. Thomas E. Crepeau, Manager Data Management Section Division of Hazardous Waste Management cc: Michael Savage, Asst. Chief, DHWM Mark Navarre, Legal Supervisor Paul Pardi, DHWM, SWDO Dave Wertz, DHWM, NED0 Don Marshall, DHWM, SWDO Steve Hamlin, DHWM, SEDO

457

Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement  

SciTech Connect (OSTI)

This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

Not Available

1993-11-01T23:59:59.000Z

458

Technical approach to finalizing sensible soil cleanup levels at the Fernald Environmental Management Project  

SciTech Connect (OSTI)

The remedial strategy for addressing contaminated environmental media was recently finalized for the US Department of Energy`s (DOE) Fernald Environmental Management Project (FEMP) following almost 10 years of detailed technical analysis. The FEMP represents one of the first major nuclear facilities to successfully complete the Remedial Investigation/Feasibility Study (RI/FS) phase of the environmental restoration process. A critical element of this success was the establishment of sensible cleanup levels for contaminated soil and groundwater both on and off the FEMP property. These cleanup levels were derived based upon a strict application of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations and guidance, coupled with positive input from the regulatory agencies and the local community regarding projected future land uses for the site. The approach for establishing the cleanup levels was based upon a Feasibility Study (FS) strategy that examined a bounding range of viable future land uses for the site. Within each land use, the cost and technical implications of a range of health-protective cleanup levels for the environmental media were analyzed. Technical considerations in driving these cleanup levels included: direct exposure routes to viable human receptors; cross- media impacts to air, surface water, and groundwater; technical practicality of attaining the levels; volume of affected media; impact to sensitive environmental receptors or ecosystems; and cost. This paper will discuss the technical approach used to support the finalization of the cleanup levels for the site. The final cleanup levels provide the last remaining significant piece to the puzzle of establishing a final site-wide remedial strategy for the FEMP, and positions the facility for the expedient completion of site-wide remedial activities.

Carr, D.; Hertel, B. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States); Jewett, M. [Brown and Root (United States); Janke, R. [USDOE Fernald Area Office (United States); Conner, B. [Smith Environmental (United States)

1996-02-01T23:59:59.000Z

459

[Tampa Electric Company IGCC project]. Final public design report; Technical progress report  

SciTech Connect (OSTI)

This final Public Design Report (PDR) provides completed design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the operating parameters and benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. Pending development of technically and commercially viable sorbent for the Hot Gas Cleanup System, the HGCU also is demonstrated. The report is organized under the following sections: design basis description; plant descriptions; plant systems; project costs and schedule; heat and material balances; general arrangement drawings; equipment list; and miscellaneous drawings.

NONE

1996-07-01T23:59:59.000Z

460

Salt Lake City Area Integrated Projects Electric Power Marketing Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

01eis0150_cov.html[6/24/2011 2:58:48 PM] 01eis0150_cov.html[6/24/2011 2:58:48 PM] COVER SHEET Title: Salt Lake City Area Integrated Projects Electric Power Marketing Final Environmental Impact Statement, DOE/EIS-0150 Cooperating Agencies: U.S. Fish and Wildlife Service, the National Park Service, and the Bureau of Reclamation Lead Agency: Western Area Power Administration, U.S. Department of Energy Written comments on this environmental impact statement (EIS) should be addressed to: For general information on the U.S. Department of Energy EIS process, contact: Mr. David Sabo Western Area Power Administration Colorado River Storage Project Customer Service Office P.O. Box 11606 Salt Lake City, Utah 84147-0606 Telephone: (801) 524-5392 Ms. Carol Borgstrom, Director Office of NEPA Policy and Assistance (EH-42)

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Terahertz spectral signatures :measurement and detection LDRD project 86361 final report.  

SciTech Connect (OSTI)

LDRD Project 86361 provided support to upgrade the chemical and material spectral signature measurement and detection capabilities of Sandia National Laboratories using the terahertz (THz) portion of the electromagnetic spectrum, which includes frequencies between 0.1 to 10 THz. Under this project, a THz time-domain spectrometer was completed. This instrument measures sample absorption spectra coherently, obtaining both magnitude and phase of the absorption signal, and has shown an operating signal-to-noise ratio of 10{sub 4}. Additionally, various gas cells and a reflectometer were added to an existing high-resolution THz Fourier transform spectrometer, which greatly extend the functionality of this spectrometer. Finally, preliminary efforts to design an integrated THz transceiver based on a quantum cascade laser were begun.

Wanke, Michael Clement; Brener, Igal; Lee, Mark

2005-11-01T23:59:59.000Z

462

Eastern Wind Integration and Transmission Study: Executive Summary and Project Overview  

Broader source: Energy.gov [DOE]

This study evaluates the future operational and integration impacts of three different 20 percent wind energy penetration scenarios and one 30 percent wind penetration scenario, including a high-level analysis of transmission to deliver the wind energy to load centers, in the study year 2024.

463

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

464

EIS-0141: Washington Water Power/B.C. Hydro Transmission Interconnection Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy developed this statement to evaluate the environmental impacts of constructing and operating a double-circuit 230-kilovolt electrical transmission line that would link the electrical systems of the Washington Water Power Company and the British Columbia Hydro and Power Authority.

465

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana  

Broader source: Energy.gov [DOE]

DOE’s Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental impacts of a proposal to rebuild approximately 120 miles of existing transmission line in Sanders, Lake, Missoula, Granite, Powell, and Deer Lodge Counties in Montana.

466

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Energy Savers [EERE]

line between Eugene and Florence, Oregon. Additional information is available at the project website: http:efw.bpa.govenvironmentalservicesDocumentLibraryLane-Wendson...

467

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

SciTech Connect (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

468

Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix  

SciTech Connect (OSTI)

The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report.

NONE

1995-07-15T23:59:59.000Z

469

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network [OSTI]

stakeholders in transmission-line route planning and sitingan “optimal” transmission line route-finding tool. This tool

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

470

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

SciTech Connect (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

471

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

472

DOE/EA-1508: Environmental Assessment for the Beaver Creek-Hoyt-Erie Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

BC-HT-EE Mitigation Action Plan Nov. 2005 1 BC-HT-EE Mitigation Action Plan Nov. 2005 1 Mitigation Action Plan To Implement Mitigation Requirements for Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado November 2005 BC-HT-EE Mitigation Action Plan Nov. 2005 2 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Construction Contractor Western Maintenance The contractor shall limit the movement of crews and equipment to the ROW, including access routes. The contractor shall limit movement on the ROW to minimize damage to residential yards, grazing land, crops, orchards, and property, and shall avoid marring the lands.

473

Validation of phasor calculations in the Macrodyne PMU for California-Oregon Transmission Project tests of March 1993  

SciTech Connect (OSTI)

Faults applied during March 1993 commissioning tests for the California-Oregon Transmission Project produced 14 Hz transient oscillations that were conspicuous in BPA`s enhanced transducers at Malin, and in PG and E`s Dynamic System Monitor at Table Mountain. Prony analysis of high speed fault data provided a detailed model for the underlying network resonance signal, and a basis for validating transient performance of a Macrodyne Phasor Measurement Unit (PMU) at the test site. This instrument, which is closely associated with EPRI`s FACTS project, provides useful insight into emerging technology for high speed digital transducers. The phasor calculations are found to be of very high quality, but filtering enhancements are recommended for broadband applications.

Hauer, J.F. [Pacific Northwest Labs., Richland, WA (United States)] [Pacific Northwest Labs., Richland, WA (United States)

1996-07-01T23:59:59.000Z

474

EIS-0091: Garrison-Spokane 500-kV Transmission Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Bonneville Power Administration (BPA) developed this statement to evaluate the environmental impacts of constructing between 254 and 271 miles of 500-kilovolt transmission line across western Montana and northern Idaho to the Spokane area in order to reinforce a section of the BPA electric power grid and to permit reliable integration of 1,240 megawatts of power produced by Colstrip Units 3 and 4, for use in Montana and throughout the Northwest.

475

EIS-0173: Bonneville Power Administration/Puget Power Northwest Washington Transmission Project  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration (BPA) prepared this environmental impact statement to analyze the environmental impacts of an upgrade that BPA and Puget Sound Power & Light Company are considering implementing on the existing high- voltage transmission system in the Whatcom and Skagit Counties area of the State of Washington, between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995.

476

Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments  

SciTech Connect (OSTI)

This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

None

1999-02-01T23:59:59.000Z

477

Background, status and future of the Transmission Electron Aberration-corrected Microscope project  

Science Journals Connector (OSTI)

...Microscope project Recent advances in aberration-correcting...DOEs) Office of Science to jointly design...great interest for aerospace and cryogenic applications...be possible to advance to a new level...heart of materials science. At this level...

2009-01-01T23:59:59.000Z

478

FINAL  

Broader source: Energy.gov (indexed) [DOE]

2 2 FINAL ENVIRONMENTAL ASSESSMENT FOR EXIDE TECHNOLOGIES ELECTRIC DRIVE VEHICLE BATTERY AND COMPONENT MANUFACTURING INITIATIVE APPLICATION, BRISTOL, TN, AND COLUMBUS, GA U.S. Department of Energy National Energy Technology Laboratory March 2010 DOE/EA-1712 FINAL ENVIRONMENTAL ASSESSMENT FOR EXIDE TECHNOLOGIES ELECTRIC DRIVE VEHICLE BATTERY AND COMPONENT MANUFACTURING INITIATIVE APPLICATION, BRISTOL, TN, AND COLUMBUS, GA U.S. Department of Energy National Energy Technology Laboratory March 2010 DOE/EA-1712 iii COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Environmental Assessment for Exide Technologies Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Bristol, TN, and Columbus, GA

479

EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

480

Microsoft Word - 10.5.11 Markup by Hargis Final EA-RTI Syngas CCS Project.docx  

Broader source: Energy.gov (indexed) [DOE]

67 67 FINAL ENVIRONMENTAL ASSESSMENT for RTI INTERNATIONAL SCALE-UP OF HIGH- TEMPERATURE SYNGAS CLEANUP AND CARBON CAPTURE AND SEQUESTRATION TECHNOLOGIES, POLK COUNTY, FLORIDA U.S. DEPARTMENT OF ENERGY National Energy Technology Laboratory October 2011 RTI Syngas Cleanup/Carbon Capture Final and Sequestration Project Environmental Assessment DOE/EA-1867 N:\MYFILES\CORRESPONDENCE\LUSK, MARK\RTI-POLK EA\FONSI FINAL EA\10.5.11 MARKUP BY HARGIS FINAL EA-RTI SYNGAS CCS PROJECT.DOCX-101411 i October 2011 COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Final Environmental Assessment for RTI International Scale-Up of High-Temperature Syngas Cleanup and Carbon Capture and Sequestration Technologies, Polk County, Florida (DOE/EA-1867)

Note: This page contains sample records for the topic "transmission project final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Fernald Environmental Management Project Director's Final Findings & Orders, December 27, 1994  

Broader source: Energy.gov (indexed) [DOE]

Ohio Environmental Protection Agency Ohio Environmental Protection Agency 0.0. Box 163669,180O WaterMark Dr. dumbus, Ohio 43216-3669 '\ 644-3020 .X (614) 644-2329 December 27. 1994 Re: U.S. Department of Energy Fernald Environmental Management Project Attn: Jack Craig, Acting Site Manager P.O. Box 389705 Cincinnati, Ohio 45239 Fernald Environmental Restoration Management Corporation Attn: Don Ofte, President P.O. Box 538704 Cincinnati, Ohio 45253-8704 Dear Sirs: /---. ., ( 1 6454 c t f.. .: ,? I '; Lb.. i" _ && 't$oinovich Governor -., ._ . _ - --. .-....-. _ .___ WY. Director's Fina$Li&Xng.s,& Orders U.S. Department of Energy .-- +-_ Fernald-Environmental Restoration Management Corporation U.S. EPA ID No.: OH6890008976 CERTIFIED MAIL Transmitted herewith are Final Findings & Orders of the Director

482

Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Comments Comments Kentucky Pioneer IGCC Demonstration Project Final Environmental Impact Statement Clark County Public Library Winchester, KY Page 1 of 5 D-1 Comment No. 1 Issue Code: 11 Gasification is different from incineration. It is a better, more environmentally responsible approach to generating energy from the use of fossil fuels and refuse derived fuel (RDF). Incineration produces criteria pollutants, semi-volatile and volatile organic compounds and dioxin/furan compounds. Ash from hazardous waste incinerators is considered a hazardous waste under the Resource Conservation and Recovery Act (RCRA). In contrast, gasification, which occurs at high temperatures and pressures, produces no air emissions, only small amounts of wastewater containing salts. Synthesis gas (syngas)

483

Fernald Environmental Management Project Director's Final Findings & Orders, September 10, 1993  

Broader source: Energy.gov (indexed) [DOE]

SEPI o 1993 SEPI o 1993 OHIO ENlmo In the Matter of: U. S. Department of Energy Femald Environmental Management Project P.O. Box 389705 Cincinnati, Ohio 45239 Issue Date: Effective Date: SEP1 0 1993 BEFORE THF, NMENTAL PROTECTION AGENCY . Director's Final Fi&in~s and Orders PREAMBLE It is hereby agreed by and among the parties hereto as follows: I. J-VRISDICTION These Director's F;ina.lFindings and Orders ("Orders") are issued to the U.S. Department of Energy ("Respondent") pursuant to the authority vested in the Director of the Ohio Environmental Protection Agency ("Ohio EPA") in Ohio Revised Code ("ORC") sections3734.02(G) and 3745.01. TheseOrders shallapply to and be binding upon the Respondent,its agents, assigns,

484

Design studies for the Mead-Phoenix 500 kV AC transmission project  

SciTech Connect (OSTI)

The Mead-Phoenix 500 kV ac line is 243 miles long and runs parallel to the existing Mead-Liberty 345 kV line. This line is planned for 70% series and 70% shunt compensation; it also incorporates the first application of a 50 kV phase shifting transformer that enables a 1,300 MW transmission capacity. This paper presents the design studies that were undertaken in arriving at the equipment ratings and insulation levels that lead to the equipment specifications. The shunt reactor switching requirements utilizing MOV across the breaker, line switching with line connected arresters and the breaker transient recovery voltage are also dealt with in the paper.

Thallam, R.S.; Lundquist, T.G.; Gerlach, D.W. [Salt River Project, Phoenix, AZ (United States)] [Salt River Project, Phoenix, AZ (United States); Atmuri, S.R. [Teshmont Consultants Inc., Winnipeg, Manitoba (Canada)] [Teshmont Consultants Inc., Winnipeg, Manitoba (Canada); Selin, D.A. [Arizona Public Service Co., Phoenix, AZ (United States)] [Arizona Public Service Co., Phoenix, AZ (United States)

1995-10-01T23:59:59.000Z

485

Manhattan Project: Final Bomb Design, Los Alamos: Laboratory, 1944-1945  

Office of Scientific and Technical Information (OSTI)

The first 0.11 seconds of the nuclear age, Trinity, July 16, 1945. FINAL BOMB DESIGN The first 0.11 seconds of the nuclear age, Trinity, July 16, 1945. FINAL BOMB DESIGN (Los Alamos: Laboratory, 1944-1945) Events > Bringing It All Together, 1942-1945 Establishing Los Alamos, 1942-1943 Early Bomb Design, 1943-1944 Basic Research at Los Alamos, 1943-1944 Implosion Becomes a Necessity, 1944 Oak Ridge and Hanford Come Through, 1944-1945 Final Bomb Design, 1944-1945 Atomic Rivals and the ALSOS Mission, 1938-1945 Espionage and the Manhattan Project, 1940-1945 American troops approaching the beach, D-Day, June 6, 1944. Late in 1944, Los Alamos began to shift from research to development and bomb production. Increased production at Oak Ridge and Hanford seemed to promise that enough plutonium and enriched uranium would be available for at least one bomb using each. Germany no longer was the intended primary target. The war in Europe (left) appeared to be entering its final phase, and evidence uncovered by the ALSOS mission in November 1944 indicated that the German atomic program had not gone beyond the research phase. Already by summer 1944, Groves and his advisers had turned their sights toward Japan. The atomic bomb would justify the years of effort, including both the vast expenditures and the judgment of everyone responsible, by bringing the war in the Pacific to a fiery end. J. Robert Oppenheimer Ongoing problems continued to complicate the efforts of Robert Oppenheimer (right) to finalize bomb design. Foremost among these were continuing personnel shortages, particularly of physicists, and supply difficulties. The procurement system, designed to protect the secrecy of the Los Alamos project, led to frustrating delays and, when Herb Lehr, SED, holding the Gadget's core, July 1945. combined with persistent late war shortages, proved a constant headache. The lack of contact between the remote laboratory and its supply sources exacerbated the problem, as did the relative lack of experience the academic scientists had with logistical matters. Leslie Groves and James Conant were determined not to let mundane problems compromise the bomb effort, and in fall 1944 they made several changes to prevent this possibility. Conant shipped as many scientists as could be spared from the Met Lab and Oak Ridge to Los Alamos, hired every civilian machinist he could lay his hands on, and arranged for Army enlisted men to supplement the work force (these GIs were known as SEDS ("Special Engineering Detachment"). Hartley Rowe, an experienced industrial engineer, provided help in easing the transition from research to production. Los Alamos also arranged for a rocket research team at the California Institute of Technology to aid in procurement, test fuses, and contribute to component development. These changes kept Los Alamos on track as design work reached its final stages.

486

Final  

Broader source: Energy.gov (indexed) [DOE]

, , Final for Vegetation Control at VHF Stations, Microwave Stations, Electrical Substations, and Pole Yards . Environmental Assessment Prepared for Southwestern Power Administration U.S. Department of Energy - _ . . . " Prepared by Black & Veatch October 13,1995 ' Table of Contents 1 . 0 Purpose and Need for Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.0 Description of the Alternatives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1 Alternative 1 . No Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2 Alternative 2 . Mechanical and Manual Control . . . . . . . . . . . . . . . . . . . 2.3 Alternative 3 . Proposed Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.1 Foliar Spray Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.2 Soil-Spot Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

487

DOE/EA-1596: Finding of No Significant Impact for Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota (02/18/09)  

Broader source: Energy.gov (indexed) [DOE]

WESTERN AREA POWER ADMINISTRATION WESTERN AREA POWER ADMINISTRATION UPPER GREAT PLAINS CUSTOMER SERVICE REGION FINDING OF NO SIGNIFICANT IMPACT Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota DOEIEA-1596 AGENCY: U.S. Department of Energy (DOE), Western Area Power Administration (Western) ACTION: Finding of No Significant Impact SUMMARY: Basin Electric Power Cooperative (Basin) has requested to interconnect their proposed new Belfield to Rhame 230-kilovolt (kV) transmission line and new Rhame Substation (Project) to the Western Area Power Administration's (Western) transmission system at Western's existing Belfield Substation. Under its Open Access Transmission Service Tariff (Tariff), Western is required to respond to Basin's interconnection requests. Western's Tariff

488

Notice of Intent to Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California  

Broader source: Energy.gov (indexed) [DOE]

2 2 Federal Register / Vol. 63, No. 30 / Friday, February 13, 1998 / Notices taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of his filing are on file with the Commission and are available for public inspection in the Public Reference Room. David P. Boergers, Acting Secretary. [FR Doc. 98-3659 Filed 2-12-98; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Western Area Power Administration Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California AGENCY: Western Area Power Administration, DOE. ACTION: Notice of intent to prepare an Environmental Impact Statement. SUMMARY: In accordance with Section

489

DOE/EIS-0325; Environmental Impact Statement for Schultz-Hanford Area Transmission Line Project (02/2002)  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense February 2002 Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement Summary Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense February 2002 Summary S-1 Summary In this Summary: * The Purposes and Need for Action * Alternatives * Affected Environment * Impacts This summary covers the major points of the Draft Environmental

490

Mitigation Action Plan for the McNary-John Day Transmission Line Project,(DOE/EIS-0332)  

Broader source: Energy.gov (indexed) [DOE]

Measures Adopted Measures Adopted for the McNary-John Day Transmission Line Project Land Use and Recreation Locate towers and roads so as not to disrupt irrigation circles, where possible. Locate structures and roads outside of agricultural fields, orchards, and vineyards, where possible. Coordinate with landowners for farm operations, including plowing, crop dusting, and harvesting. Redesign irrigation equipment and compensate landowner for additional reasonable costs where new right-of-way needs to be acquired. Compensate farmers for crop damage and restore compacted soils. Control weeds around the base of the towers. Keep gates and fences closed and in good repair to contain livestock. Repair damages to access roads caused by or arising out of Bonneville use, leaving roads in good or better

491

Record of Decision for the Los Banos-Gates Transmission Project (DOE/EIS-0128-SA-01)  

Broader source: Energy.gov (indexed) [DOE]

99 99 Federal Register / Vol. 66, No. 245 / Thursday, December 20, 2001 / Notices A copy of any motion to intervene must also be served upon the representative of the RAWA specified in item h, above. p. Agency Comments-Federal, state, and local agencies are invited to file comments on the subject application for surrender of exemption. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representative listed in item h, above. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 01-31311 Filed 12-19-01; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Western Area Power Administration Los Banos-Gates Transmission Project AGENCY: Western Area Power

492

EIS-0332: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0332: Final Environmental Impact Statement McNary-John Day Transmission Line Project This document is the final Environmental Impact Statement (EIS) for Bonneville Power Administration's (Bonneville's) proposed McNary-John Day Transmission Line Project.This document has been prepared as an "abbreviated" final EIS pursuant to the Council on Environmental Quality's (CEQ) National Environmental Policy Act (NEPA) regulations because there have been no substantial changes to the proposed action, alternatives, or environmental analysis presented in the draft EIS for this project. McNary-John Day Transmission Line Project, Final Environmental Impact Statement, DOE/EIS-0332 (August 2002) More Documents & Publications

493

The effect of transmission-line corridor edge and successional stage on the animal community. Final report  

SciTech Connect (OSTI)

Using breeding success as a criterion of habitat quality, this report evaluates the suitability of 2 transmission-line corridor habitat types, grassland and shrubland, for open-nesting passerines in western Maryland. The main objectives were to investigate the patterns of fledging success and spatial distribution of nests in each habitat type in relation to the corridor, corridor-forest edge, and the adjacent forest, and to quantify important features of the microhabitat of corridor and forest nests that may influence nest success. The second part of this report examines the effect of a transmission-line corridor on forest animal communities by monitoring their activity patterns in the corridor. Animal activity patterns are compared between a transmission-line corridor that was maintained in shrubby vegetation by selective spraying of herbicides and one that was managed for herbaceous vegetation by mowing with rotary mowers.

Gates, D.J.E.

1982-01-01T23:59:59.000Z

494

Manhattan Project: Potsdam and the Final Decision to Use the Bomb, July  

Office of Scientific and Technical Information (OSTI)

Joseph Stalin, Harry Truman, and Winston Churchill at the Potsdam Conference, July 1945 POTSDAM AND THE FINAL DECISION TO USE THE BOMB Joseph Stalin, Harry Truman, and Winston Churchill at the Potsdam Conference, July 1945 POTSDAM AND THE FINAL DECISION TO USE THE BOMB (Potsdam, Germany, July 1945) Events > Dawn of the Atomic Era, 1945 The War Enters Its Final Phase, 1945 Debate Over How to Use the Bomb, Late Spring 1945 The Trinity Test, July 16, 1945 Safety and the Trinity Test, July 1945 Evaluations of Trinity, July 1945 Potsdam and the Final Decision to Bomb, July 1945 The Atomic Bombing of Hiroshima, August 6, 1945 The Atomic Bombing of Nagasaki, August 9, 1945 Japan Surrenders, August 10-15, 1945 The Manhattan Project and the Second World War, 1939-1945 Potsdam, July 19, 1945. Truman wrote a note on the back of the photograph in which he states incorrectly that Stalin did not know about the atomic bomb. After President Harry S. Truman received word of the success of the Trinity test, his need for the help of the Soviet Union in the war against Japan was greatly diminished. The Soviet leader, Joseph Stalin, had promised to join the war against Japan by August 15th. Truman and his advisors now were not sure they wanted this help. If use of the atomic bomb made victory possible without an invasion, then accepting Soviet help would only invite them into the discussions regarding the postwar fate of Japan. During the second week of Allied deliberations at Potsdam, on the evening of July 24, 1945, Truman approached Stalin without an interpreter and, as casually as he could, told him that the United States had a "new weapon of unusual destructive force." Stalin showed little interest, replying only that he hoped the United States would make "good use of it against the Japanese." The reason for Stalin's composure became clear later: Soviet intelligence had been receiving information about the atomic bomb program since fall 1941.

495

DOE/EIS-0289, Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project (June 1, 2000)  

Broader source: Energy.gov (indexed) [DOE]

FINAL FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE JEA CIRCULATING FLUIDIZED BED COMBUSTOR PROJECT JACKSONVILLE, FLORIDA June 2000 U.S. DEPARTMENT OF ENERGY COVER SHEET June 2000 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) TITLE Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project; Jacksonville, Duval County, Florida CONTACT Additional copies or information concerning this final environmental impact statement (EIS) can be obtained from Ms. Lisa K. Hollingsworth, National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, National Energy Technology Laboratory, 3610 Collins Ferry Road, P. O. Box 880, Morgantown, WV 26507-0880. Telephone: (304) 285-4992. Fax: (304) 285-4403. E-mail: lisa.hollingsworth@netl.doe.gov.

496

Portsmouth DUF6 Conversion Final EIS - Appendix D: Environmental Synopsis for the Depleted UF6 Conversion Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Portsmouth DUF Portsmouth DUF 6 Conversion Final EIS APPENDIX D: ENVIRONMENTAL SYNOPSIS FOR THE DEPLETED UF 6 CONVERSION PROJECT Environmental Synopsis D-2 Portsmouth DUF 6 Conversion Final EIS ENVIRONMENTAL SYNOPSIS FOR THE DEPLETED UF 6 CONVERSION PROJECT (Solicitation No. DE-RP05-01OR22717) October 2002 Environmental Assessment Division Argonne National Laboratory Argonne, Illinois Prepared for Office of Site Closure - Oak Ridge Office (EM-32) Office of Environmental Management U.S. Department of Energy Washington, D.C. October 2002 iii CONTENTS 1 INTRODUCTION........................................................................................................... 1 2 BACKGROUND.............................................................................................................

497

Paducah DUF6 Conversion Final EIS - Appendix D: Environmental Synopsis for the Depleted UF6 Conversion Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Paducah DUF Paducah DUF 6 Conversion Final EIS APPENDIX D: ENVIRONMENTAL SYNOPSIS FOR THE DEPLETED UF 6 CONVERSION PROJECT Environmental Synopsis D-2 Paducah DUF 6 Conversion Final EIS ENVIRONMENTAL SYNOPSIS FOR THE DEPLETED UF 6 CONVERSION PROJECT (Solicitation No. DE-RP05-01OR22717) October 2002 Environmental Assessment Division Argonne National Laboratory Argonne, Illinois Prepared for Office of Site Closure - Oak Ridge Office (EM-32) Office of Environmental Management U.S. Department of Energy Washington, D.C. October 2002 iii CONTENTS 1 INTRODUCTION........................................................................................................... 1 2 BACKGROUND............................................................................................................. 3 3

498

Final LDRD Report for Projects %23 52797 and %23 93362: Rational Understanding and Control of the Magnetic Behavior of Nanoparticles.  

SciTech Connect (OSTI)

This is the final LDRD report for projects %23 52797 and %23 93362 that funded a five year research program directed by Prof. Z. John Zhang at the Georgia Institute of Technology Chemistry Department. Prof. Zhang was awarded this funding after winning a Presidential Early Career Award in Science and Engineering (PECASE) in 2001 with Sandia as the DOE sponsoring lab. The project PI was Blake Simmons and the PM was Alfredo Morales. The page intentionally left blank

Zhang, Z. John

2006-11-01T23:59:59.000Z

499

Flatiron-Erie 115kV transmission line project, Larimer, Weld and Boulder Counties, Colorado. Draft environmental impact statement  

SciTech Connect (OSTI)

Western Area Power Administration (Western) proposes to uprate its existing 115-kV Flatiron-Erie transmission line. The line is located in Larimer, Weld and Boulder Counties, Colorado, and passes through the City of Longmont. The line connects Flatiron Substation and several of the substations supplying Longmon