Powered by Deep Web Technologies
Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Dynamic Power Flow Controller: Compact Dynamic Phase Angle Regulators for Transmission Power Routing  

SciTech Connect

GENI Project: Varentec is developing compact, low-cost transmission power controllers with fractional power rating for controlling power flow on transmission networks. The technology will enhance grid operations through improved use of current assets and by dramatically reducing the number of transmission lines that have to be built to meet increasing contributions of renewable energy sources like wind and solar. The proposed transmission controllers would allow for the dynamic control of voltage and power flow, improving the grid’s ability to dispatch power in real time to the places where it is most needed. The controllers would work as fail-safe devices whereby the grid would be restored to its present operating state in the event of a controller malfunction instead of failing outright. The ability to affordably and dynamically control power flow with adequate fail-safe switchgear could open up new competitive energy markets which are not possible under the current regulatory structure and technology base.

None

2012-01-03T23:59:59.000Z

2

FOR ELECTRIC POWER TRANSMISSION  

E-Print Network (OSTI)

A contract network extends the concept of a contract path to address the problem of loop flow and congestion in electric power transmission systems. A contract network option provides a well defined, internally consistent framework for assigning long-term capacity rights to a complicated electric transmission network. The contract network respects the special conditions induced by Kirchoff's Laws; accommodates thermal, voltage and contingency constraints on transmission capacity; and can be adopted without disturbing existing methods for achieving an economic power dispatch subject to these constraints. By design, a contract network would maintain short-run efficiency through optimal spot price determination of transmission prices. Through payment of congestion rentals, the contract network makes a long-term capacityright holder indifferent between delivery of the power or receipt of payments in a settlement system. And the contract network framework can support allocation of transmission capacity rights through a competitive bidding process. CONTRACT NETWORKS

William W. Hogan; William W. Hogan

1990-01-01T23:59:59.000Z

3

Power superconducting power transmission cable  

DOE Patents (OSTI)

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

4

Bulk Power Transmission Study  

E-Print Network (OSTI)

"Texans now have a choice. We can become more efficient and maintain our standard of living, or we can continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled, the extensive natural gas pipeline network moved energy easily within the state. In recent years two things have changed: 1. Electric utilities have made extensive investment in lignite, coal, and nuclear plants and, 2. Improvements in gas turbine technology and the removal of institutional barriers has encouraged cogeneration at many of our energy intensive process industries. This energy diversity means that there are now significant differences in energy costs between units. The variable costs of generation of power can vary between units by a ratio of 2 or 3 to 1 and this difference will be accentuated when energy costs rise (and they will; it’s a question of when, not if). The potential for costs savings by optional dispatching of the entire interconnected system are greater than ever before as demonstrated by the PUC's Bulk Power Transmission Study. And the potential can be enhanced with added transmission system investment. Cogeneration and small power production has proven to be the most cost effective way for Texas to add additional generating capacity needed to supply an economy that is starting to rebound and to replace old, obsolete power plants. The freedom to locate these facilities at the fuel source or at the site of large thermal demand makes real economic and environmental sense. The use of renewable or waste fuels allows something that would otherwise be wasted to contribute to our economy. Fossil fuels that are displaced can be redirected to another use or consumed for future benefit. By integrating a gas turbine generator with a. process plant, the natural gas required for producing electricity can be reduced by 40% below that required for a combined cycle. The heat rejected from a gas turbine, combined cycle, or steam plant can be redirected to a process use that contributes to our economy by producing something of value to world markets. By contrast a conventional power plant is paid for by the rate payers and consumes Texas natural resources and therefore is a burden rather than an enhancement to our economy. The optimal location of facilities are possible only if there is an adequate transmission system. Utility, consumer and industry must cooperate to improve our transmission system for the benefit of all Texas. The Texas Public Utilities Commission has taken the lead in promoting efficiency by requiring transmission wheeling between qualifying facilities and electric utilities. Several cogeneration facilities have been constructed as a result. In order to encourage small power production, the rule needs to be expanded to include projects interconnected with distribution systems. Most renewable resource projects are relatively small and cannot afford the cost of a high voltage interconnect, and yet their characteristics match a baseload need. The ability to wheel power to a utility that needs base load power from a distribution level interconnection is essential to development of these smaller projects."

John, T.

1988-09-01T23:59:59.000Z

5

Internet Routing Algorithms, Transmission and Time: Toward a Concept of Transmisive Control.  

E-Print Network (OSTI)

??This dissertation develops the concept of transmissive control to explore the consequences of changes in Internet routing for communication online. Where transmission often denotes an… (more)

McKelvey, Fenwick Robert

2013-01-01T23:59:59.000Z

6

Wireless Power Transmission  

Office of Scientific and Technical Information (OSTI)

88 88 Lunar Wireless Power Transfer Feasibility Study March 2008 Prof. Zoya Popovic, University of Colorado, Boulder David R. Beckett, Scott R. Anderson, Diana Mann, Stuart Walker, Independent Consultants Sheldon Fried, Ph.D., National Security Technologies, LLC Abstract - This study examines the feasibility of a multi-kilowatt wireless radio frequency (RF) power system to transfer power between lunar base facilities. Initial analyses, show that wireless power transfer (WPT) systems can be more efficient and less expensive than traditional wired approaches for certain lunar and terrestrial applications. The study includes evaluations of the fundamental limitations of lunar WPT systems, the interrelationships of possible operational parameters, and a baseline design approach for a notionial system that could be used in the near

7

Electric Power Generation and Transmission (Iowa) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Generation and Transmission (Iowa) Electric Power Generation and Transmission (Iowa) < Back Eligibility Agricultural Industrial Investor-Owned Utility MunicipalPublic...

8

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

9

Directional Reactive Power Ground Plane Transmission  

Directional Reactive Power Ground Plane Transmission Technology Summary ... The invention can transmit electrical power through the surface of the ...

10

Distributed Power Flow Control: Distributed Power Flow Control using Smart Wires for Energy Routing  

Science Conference Proceedings (OSTI)

GENI Project: Smart Wire Grid is developing a solution for controlling power flow within the electric grid to better manage unused and overall transmission capacity. The 300,000 miles of high-voltage transmission line in the U.S. today are congested and inefficient, with only around 50% of all transmission capacity utilized at any given time. Increased consumer demand should be met in part with more efficient and an economical power flow. Smart Wire Grid’s devices clamp onto existing transmission lines and control the flow of power within—much like how internet routers help allocate bandwidth throughout the web. Smart wires could support greater use of renewable energy by providing more consistent control over how that energy is routed within the grid on a real-time basis. This would lessen the concerns surrounding the grid’s inability to effectively store intermittent energy from renewables for later use.

None

2012-04-24T23:59:59.000Z

11

Casablanca Carlos American Electric Power Transmission Owner  

E-Print Network (OSTI)

(Facilitator) Chantal PJM Interconnection Not Applicable Horstmann John Dayton Power & Light Company (The) Transmission Owner Issermoyer John PPL Electric Utilities Corp. dba PPL Utilities Transmission Owner

Pjm Interconnection Llc; Teleconference Webex Participants; Firstenergy Solutions; Corp Transmission Owner; Boltz Jeff; Firstenergy Solutions; Corp Transmission Owner; Fecho Thomas; Indiana Michigan; Power Company; Transmission Owner; Patten Kevin; Company Transmission Owner

2012-01-01T23:59:59.000Z

12

Wireless power transmission for medical applications  

E-Print Network (OSTI)

We studied the wireless power transmission capabilities of microwave through human skin-tissue. Microwave transmission through simulated human skins was tested with rectenna array as a power receiver located under the ...

Payne, Joshua E.

13

Transmission Rights and Market Power James Bushnell  

E-Print Network (OSTI)

of the transmission grid can advantage some competitors at the expense of others. In electricity markets around control of transmission paths. In electricity markets such as California's, even financial transmissionPWP-062 Transmission Rights and Market Power James Bushnell April, 1999 This paper is part

California at Berkeley. University of

14

Fair Coalitions for Power-Aware Routing in Wireless Networks  

Science Conference Proceedings (OSTI)

Several power-aware routing schemes have been developed for wireless networks under the assumption that nodes are willing to sacrifice their power reserves in the interest of the network as a whole. But, in several applications of practical utility, ... Keywords: Wireless communication, algorithm design and analysis, energy-aware systems and routing.

Ratul K. Guha; Carl A. Gunter; Saswati Sarkar

2007-02-01T23:59:59.000Z

15

Directional Reactive Power Ground Plane Transmission - Energy ...  

ORNL researchers have developed a pioneering power ... out-of-phase with respect to time. This phenomenon allows electrical transmission on a single ...

16

Transmission planning in deregulated power markets.  

E-Print Network (OSTI)

??Transmission systems in deregulated power systems have largely been left to centralized network operators although various forms of participation by merchant operators have been proposed.… (more)

Panambarage Anton Jagath Fonseka.

2008-01-01T23:59:59.000Z

17

Green Island Power Authority Transmission Voltage Support System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Island Power Authority Transmission Voltage Support System Project Green Island Power Authority Transmission Voltage Support System Project Power point presentation...

18

Routing for power minimization in the speed scaling model  

Science Conference Proceedings (OSTI)

We study network optimization that considers power minimization as an objective. Studies have shown that mechanisms such as speed scaling can significantly reduce the power consumption of telecommunication networks by matching the consumption of each ... Keywords: power saving, routing, speed scaling, wireline networks

Matthew Andrews; Antonio Fernández Anta; Lisa Zhang; Wenbo Zhao

2012-02-01T23:59:59.000Z

19

Policy Issues for Retail Beamed Power Transmission  

E-Print Network (OSTI)

it possible to deliver electric power to off-grid locations using millimeter-wave beams and compact, efficient of very large utility-scale power plants, serving given areas in a hub-and-spoke arrangement. GridPolicy Issues for Retail Beamed Power Transmission Girish Chowdhary, Rajeev Gadre, Narayanan

20

Transmission rights and market power on electric power networks  

E-Print Network (OSTI)

We analyze whether and how the allocation of transmission rights associated with the use of electric power networks affects the behavior of electricity generators and electricity consumers with market power. We consider ...

Joskow, Paul L.

2000-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Transmission Power Quality Benchmarking Method  

Science Conference Proceedings (OSTI)

In 1990, EPRI initiated a power quality monitoring project at the distribution level known as the EPRI DPQ Project. During this project, twenty-four utilities monitored power quality levels on their distribution circuits. Nearly 300 sites were monitored for a period of approximately two years. The data gathered were characterized and analyzed to form a baseline of power quality on U.S. distribution circuits.

2000-12-05T23:59:59.000Z

22

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

23

Power Flow Controller for Renewables: Transformer-less Unified Power Flow Controller for Wind and Solar Power Transmission  

SciTech Connect

GENI Project: MSU is developing a power flow controller to improve the routing of electricity from renewable sources through existing power lines. The fast, innovative, and lightweight circuitry that MSU is incorporating into its controller will eliminate the need for a separate heavy and expensive transformer, as well as the construction of new transmission lines. MSU’s controller is better suited to control power flows from distributed and intermittent wind and solar power systems than traditional transformer-based controllers are, so it will help to integrate more renewable energy into the grid. MSU‘s power flow controller can be installed anywhere in the existing grid to optimize energy transmission and help reduce transmission congestion.

None

2012-02-08T23:59:59.000Z

24

Electric Power Transmission and Distribution (EPTD) Smart Grid...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New York) Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New York) < Back...

25

Transmission Issues and Power Exchanges in Texas  

E-Print Network (OSTI)

The electric transmission system in Texas has evolved over the years to its present state, in order to provide reliable service and reduce the amount of reserve capacity any individual utility needs to maintain. Presently there is pressure on the transmission owning utilities by several parties, primary distribution cooperatives, cogenerators, and large industrial customers, to grant wider access to the system. This pressure is coming at a time when transmission lines are becoming increasingly difficult to build. This paper presents a historical background on the development of the transmission system and describes the problems of assessing the impact and properly pricing certain bulk power transactions. In addition, it briefly describes the Electro-Magnetic Fields problem and how it relates to new transmission line construction.

Hughes, H. L.

1992-04-01T23:59:59.000Z

26

Power Savings in Packet Networks via Optimised Routing  

Science Conference Proceedings (OSTI)

This paper examines the use of a gradient-based algorithm for Quality of Service (QoS) and power minimisation in wired networks to result on reduced energy consumption. Two distinct schemes, conventional shortest-path routing and an autonomic algorithm ... Keywords: QoS, computer networks, energy optimisation

Erol Gelenbe; Christina Morfopoulou

2012-02-01T23:59:59.000Z

27

Termination for superconducting power transmission systems  

DOE Patents (OSTI)

This patent relates to a cold, electrical gradient, terminal section for a superconducting cable for alternating current power transmission. A cold electrical gradient section filled with a gaseous coolant acting as an insulator is provided in series with a separate thermal gradient section. (auth)

Forsyth, E.B.; Jensen, J.E.

1975-08-26T23:59:59.000Z

28

1996 Wholesale Power and Transmission Rate Schedules.  

Science Conference Proceedings (OSTI)

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

29

Power electronics in electric utilities: HVDC power transmission systems  

SciTech Connect

High Voltage Direct Current (HVDC) power transmission systems constitute an important application of power electronics technology. This paper reviews salient aspects of this growing industry. The paper summarizes the history of HVDC transmission and discusses the economic and technical reasons responsible for development of HVDC systems. The paper also describes terminal design and basic configurations of HVDC systems, as well as major equipments of HVDC transmission system. In this regard, the state-of-the-art technology in the equipments constructions are discussed. Finally, the paper reviews future developments in the HVDC transmission systems, including promising technologies, such as multiterminal configurations, Gate Turn-Off (GTO) devices, forced commutation converters, and new advances in control electronics.

Nozari, F.; Patel, H.S.

1988-04-01T23:59:59.000Z

30

Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission  

E-Print Network (OSTI)

Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission Summary of Key..................................................................................................................................... 1 Northwest Transmission Planning), there was concern that there had been little progress on addressing the developing transmission issues in the region

31

Power routing: dynamic power provisioning in the data center  

Science Conference Proceedings (OSTI)

Data center power infrastructure incurs massive capital costs, which typically exceed energy costs over the life of the facility. To squeeze maximum value from the infrastructure, researchers have proposed over-subscribing power circuits, relying on ... Keywords: data centers, power infrastructure

Steven Pelley; David Meisner; Pooya Zandevakili; Thomas F. Wenisch; Jack Underwood

2010-03-01T23:59:59.000Z

32

Transmission and Generation Investment In a Competitive Electric Power Industry  

E-Print Network (OSTI)

PWP-030 Transmission and Generation Investment In a Competitive Electric Power Industry James;PWP-030 Transmission and Generation Investment In a Competitive Electric Power Industry James Bushnell. Transmission and Generation Investment In a Competitive Electric Power Industry James Bushnell and Steven Stoft

California at Berkeley. University of

33

Vehicle routing for the last mile of power system restoration  

SciTech Connect

This paper studied a novel problem in power system restoration: the Power Restoration Vehicle Routing Problem (PRVRP). The goal of PRVRPs is to decide how coordinate repair crews effectively in order to recover from blackouts as fast as possible after a disaster has occurred. PRVRPs are complex problems that combine vehicle routing and power restoration scheduling problems. The paper proposed a multi-stage optimization algorithm based on the idea of constraint injection that meets the aggressive runtime constraints necessary for disaster recovery. The algorithms were validated on benchmarks produced by the Los Alamos National Laboratory, using the infrastructure of the United States. The disaster scenarios were generated by state-of-the-art hurricane simulation tools similar to those used by the National Hurricane Center. Experimental results show that the constraint-injection algorithms can reduce the blackouts by 50% or more over field practices. Moreover, the results show that the constraint-injection algorithm using large neighborhood search over a blackbox simulator provide competitive quality and scales better than using a MIP solver on the subproblems.

Bent, Russell W [Los Alamos National Laboratory; Coffrin, Carleton [Los Alamos National Laboratory; Van Hentenryck, Pascal [BROWN UNIV.

2010-11-23T23:59:59.000Z

34

Biennial Assessment of the Fifth Power Plan Transmission Issues  

E-Print Network (OSTI)

unscheduled electricity flows over transmission lines leading to increased risks to electric system-construction alternatives to transmission; · Inability to effectively monitor the wholesale electricity market, identifyBiennial Assessment of the Fifth Power Plan Transmission Issues INTRODUCTION The Fifth Power Plan

35

Use of superconductive technology for energy storage and power transmission for large power systems: power parks  

DOE Green Energy (OSTI)

A general review and technology assessment of superconducting magnets for energy storage and superconducting cables for power transmission are presented. It is concluded that the technology is now available for applying superconductivity in the power industry. (TFD)

Keller, W.E.

1977-01-01T23:59:59.000Z

36

TRANSMISSION EFFECTS IN MARKET POWER ANALYSIS OF ELECTRICITY MARKETS  

E-Print Network (OSTI)

TRANSMISSION EFFECTS IN MARKET POWER ANALYSIS OF ELECTRICITY MARKETS Thomas J. Overbye George Gross, congestion, merger analysis, PTDF 1. INTRODUCTION The electric power industry throughout the world of the impact that the electrical transmission system has on the analysis market power opportunities

Gross, George

37

Reliability by design in distributed power transmission networks  

Science Conference Proceedings (OSTI)

The system operator of a large power transmission network must ensure that power is delivered whenever there is demand in order to maintain highly reliable electric service. To fulfill this mandate, the system operator must procure reserve capacity to ... Keywords: Inventory theory, Networks, Optimization, Power transmission

Mike Chen; In-Koo Cho; Sean P. Meyn

2006-08-01T23:59:59.000Z

38

Towards greener wireless transmission: Efficient power amplifier design  

Science Conference Proceedings (OSTI)

The power budget of a transmitter is critically dependent on the design of the Power Amplifier (PA). Different applications require widely different values for the Effective Isotropic Radiated Power (E.I.R.P). These values range from as low as -20 dBm ... Keywords: frequency 400 MHz to 2.25 GHz, greener wireless transmission, power amplifier design, highly efficient wireless power transmission, class-C amplifier, switched-capacitor PA, orthogonal frequency-division multiplexing modulation

K. Natarajan; Sangmin Yoo; D. J. Allstot; J. S. Walling

2011-07-01T23:59:59.000Z

39

Green Island Power Authority Transmission Voltage Support System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(2009?) Potential 2nd generation HTSC link to 100 MW hydro Control and quality Industrial load expansion requires high power quality Emergency islanding capability Transmission...

40

Mobile Ad Hoc Data Networks for Emergency Preparedness Telecommunications - Dynamic Power-Conscious Routing Concepts  

E-Print Network (OSTI)

this report, we focus on the Network Layer operation of routing and implications of power consumption for emergency MANETs. We discuss the bene#ts of power consciousness and conduct an initial investigation on the e#ects of energy-e#cient wireless routing in MANETs. We develop an initial dynamic power-conscious routing scheme #minimum power routing - MPR# that incorporates physical layer and link layer statistics to conservepower, while compensating for the propagation path loss, shadowing and fading e#ects, and interference environment at the intended receiver. The main idea of MPR is to select the path between a given source and destination that will require the least amount of total power expended, while still maintaining an acceptable signal-to-noise ratio #SNR# at each receiver. A #cost" function is assigned to every link re#ecting the transmitter power required to reliably communicate on that link. Routing decisions and cost updates are made based on feedback or information extracted from the received signal and special control packets. As an initial approach, we use the distributed Bellman-Ford algorithm to perform #shortest" path routing with the cost functions as the link distances. The resulting #shortest path" is the MPR path from a given source to a destination. We compare the performance of MPR to the common routing protocols of shortest distance routing with power control #SD-PC# and minimum hop routing with power control #MH-PC#, and present our preliminary results

Madhavi W. Subbarao

2000-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Champlain Hudson Power Express Transmission Line Project, 7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City. Public Comment Opportunities None available at this time. Documents Available for Download December 6, 2013 EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York

42

Power upgrading of transmission line by combining AC-DC transmission  

Science Conference Proceedings (OSTI)

Long extra high voltage (EHV) ac lines cannot be loaded to their thermal limits in order to keep sufficient margin against transient instability. With the scheme proposed in this project, it is possible to load these lines very close to their thermal ... Keywords: extra high voltage (EHV)transmission, flexible ac transmission system (FACTS), power system computer-aided design(PSCAD), simultaneous ac-dc power transmission

Jarupula Somlal

2010-07-01T23:59:59.000Z

43

Dynamics of Transmission Provision in a Competitive PowerIndustry  

Science Conference Proceedings (OSTI)

The main objective of this paper is to revisit the operations and planning of an electric power system, and, more specifically, of its transmission system. The intent is to formulate the underlying problems as decision-making problems with specific ... Keywords: competition, discrete event dynamic systems, dynamic programming, electric power systems, optimal stochastic control, transmission

Chien-Ning Yu; Jean-Pierre Leotard; Marija D. Ilic

1999-11-01T23:59:59.000Z

44

Detecting transmission power misbehaviour in wi-fi networks  

Science Conference Proceedings (OSTI)

In Wi-Fi networks, transmission (TX) power levels are constrained by regulatory limits. However, the emergence of flexible MAC drivers allows the easy modification of PHY and MAC layer parameters. This has enabled users to attempt to violate these limits. ... Keywords: EIRP, Wi-Fi, detection, misbehaviour, transmission power

Szymon Szott, Marek Sikora, Marek Natkaniec, Krzysztof Loziak

2013-09-01T23:59:59.000Z

45

Joint optimisation for power control, scheduling and routing algorithms in the infrastructure wireless mesh network  

Science Conference Proceedings (OSTI)

The performance optimisation model for the IEEE 802.16 standard based wireless mesh network is presented and a joint optimisation method is proposed as the sub-optimal solution strategy, in which the power control, scheduling and routing algorithms ... Keywords: IEEE 80216, WMN, network throughput, performance optimisation, power control, routing, scheduling, simulation, wireless mesh networks, wireless networks

Mugen Peng; Yingjie Wang; Kun Wang; Wenbo Wang

2008-02-01T23:59:59.000Z

46

Green Power Transmission Line Given New Life | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Power Transmission Line Given New Life Green Power Transmission Line Given New Life Green Power Transmission Line Given New Life March 11, 2010 - 4:34pm Addthis Poles for the Montana-Alberta Tie Line are unloaded outside Shelby, Mont. | Photo courtesy of Tonbridge Power Poles for the Montana-Alberta Tie Line are unloaded outside Shelby, Mont. | Photo courtesy of Tonbridge Power Stephen Graff Former Writer & editor for Energy Empowers, EERE Thanks to funds from the American Recovery and Reinvestment Act, construction of a green power transmission line stretching from Lethbridge, Alberta in Canada, down to Great Falls, Mont., was put back on track after a bank failure. Currently under construction, the Montana-Alberta Tie Line, which is owned by Toronto-based Tonbridge Power, will connect the electricity markets of

47

Ecological benefits of dc power transmission  

Science Conference Proceedings (OSTI)

The environmental effects of dc overhead transmission lines are examined. The major effects of ac and dc transmission lines are compared. Dc lines have advantages compared to ac lines in terms of electrical safety for people under the lines, biological effects, corona losses, and clearance width.

Kutuzova, N. B. [JSC 'NIIPT' (Russian Federation)

2011-05-15T23:59:59.000Z

48

On financial transmission rights and market power  

Science Conference Proceedings (OSTI)

This paper studies financial transmission rights in electricity pool markets with nodal pricing, when these rights are to be allocated by an auction mechanism. A market distribution function approach is used to investigate the effects on electricity ... Keywords: Electricity markets, Financial transmission rights, Nodal pricing

Geoffrey Pritchard; Andy Philpott

2005-10-01T23:59:59.000Z

49

Final environmental assessment: Los Reales 115 kV transmission line alternative routes  

Science Conference Proceedings (OSTI)

The Central Arizona Project (CAP) was authorized as a part of the Colorado River Basin Project Act (Public Law 90-537) on September 30, 1968. The primary purpose of the CAP is to furnish water for agricultural, municipal, and industrial uses in central and southern Arizona, and western New Mexico. Due to its magnitude, the CAP is divided into several major features serving separate but interrelated functions. The Tucson Aqueduct Phase B pumping plants were designed and constructed to operate on a looped power system. The entire looped power system, including two switching stations and connecting 115-kv transmission lines, was identified in the FEIS and approved for construction in the Secretary of Interior's Record of Decision dated September 24, 1985. The loop begins in the vicinity of the Twin Peaks Pumping Plant -- the northernmost Phase B pumping station, at the Rattlesnake Switching Station. All of the looped power system has been constructed with the exception of the switching station and portion of transmission line proposed to be constructed in this project. Without construction of this final portion of the looped power system, the Phase B pumping plants will not be able to operate normally without negatively affecting nearby power sources. The CAP will also not be able to provide the reliability necessary for municipal water systems dependent upon CAP water. The purpose of this EA is to describe impacts that would result from relocating the Los Reales 115-kV transmission line, and possibly the switching station, originally identified in the FEIS. It should be mentioned the Department of Energy will complete a separate NEPA review.

Not Available

1989-10-01T23:59:59.000Z

50

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

NLE Websites -- All DOE Office Websites (Extended Search)

447: Champlain Hudson Power Express Transmission Line Project, 447: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line will run from the Canadian Province of Quebec to New York City. DOE also published a notice correcting the location of the public hearing that was held on November 19, 2013. Public Comment Opportunities As of December 6, 2013 - Comment Period Extended through 1/15/14 Written comments must be received by January 15, 2014. Comments submitted

51

Investigation of Multi-Frequency Power Transmission and System  

E-Print Network (OSTI)

This dissertation presents a new power system transmission concept based on frequency selectivity named Multi-Frequency Power System (MFPS). This system allows for selective power transmission among terminals in an interconnected system, and is enabled by power electronic technology. The dissertation starts with a presentation of some of the challenges faced by modern power systems, and includes a description of various power system technologies developed in an attempt to solve them. Then, our proposed solution is presented as an alternative to electric power transmission, and the fundamental concepts are explained. A version of the MFPS is developed, which has relevance to the problem of renewable sources integration. This AC DC Power System is further explored, and the topology of the system and the converters is presented, as well as the control techniques used in its operation. The dissertation also presents a performance study of the AC DC system, which was done in Simulink, and it demonstrates the robustness of the system under various dynamic and fault conditions. Finally, a summary of the work is given in the last section of the dissertation. The contributions of our research to the state of technology are discussed. These contributions include: the demonstration of power selectivity based on frequency identification, the development of a novel transmission system and a AC DC integrated implementation of it, and the development of a control and converter that enables selective power transmission. Also, some of the most relevant future research initiatives related to this topic are presented.

Barazarte Conte, Ronald

2011-08-01T23:59:59.000Z

52

NREL: Transmission Grid Integration - Active Power Controls  

NLE Websites -- All DOE Office Websites (Extended Search)

Active Power Controls Active Power Controls NREL has teamed with the Electric Power Research Institute, the Colorado School of Mines, the University of Colorado, and other industry members to research the potential of wind turbines and power plants to provide active power control (also known as real power or frequency control) to the electric power system. Under this multiyear project, researchers will perform simulations and field tests at the National Wind Technology Center to analyze system benefits and impacts on the operations of wind turbines and the electric power system. The project considers five topics: Steady state and economics Dynamic interconnection stability Controls design and simulation Controls testing and loads and structural impacts Dissemination of results.

53

Managing transmission curtailment risk in wholesale power markets  

SciTech Connect

Risk resulting from transmission loading relief calls made by transmission system operators can be managed with information estimated by a statistical model capable of predicting one day in advance the probability that a particular wholesale power transaction might be curtailed. The model predicts this probability with a reasonable degree of accuracy using information on variables that can be obtained publicly. (author)

Morey, Mathew J.; Kirsch, Laurence D.

2009-11-15T23:59:59.000Z

54

Useful-Skew Clock Routing with Gate Sizing for Low Power Design  

Science Conference Proceedings (OSTI)

This paper presents a new problem formulation and algorithm of clock routing combined with gate sizing for minimizing total logic and clock power. Instead of zero-skew or assuming a fixed skew bound, we seek to produce useful skews in clock routing. ...

Joe Gufeng Xi; Wayne Wei-Ming Dai

1997-07-01T23:59:59.000Z

55

Examining transmission power in minimum capacity underwater acoustic networks  

E-Print Network (OSTI)

This paper explores the prospect of reducing the transmission power required to operate links within an underwater acoustic network by minimizing the total capacity of the network while maintaining certain data flow ...

Stanchak, Kathryn E

2010-01-01T23:59:59.000Z

56

DC power transmission from the Leningradskaya Nuclear Power Plant to Vyborg  

SciTech Connect

DC power transmission from the Leningradskaya Nuclear Power Plant (LAES) to city of Vyborg is proposed. This will provide a comprehensive solution to several important problems in the development and control of the unified power system (EES) of Russia.

Koshcheev, L. A. [JSC 'NIIPT' (Russian Federation); Shul'ginov, N. G. [JSC 'SO EES' (Russian Federation)

2011-05-15T23:59:59.000Z

57

Minimum power allocation for cooperative routing in multihop wireless networks  

Science Conference Proceedings (OSTI)

Due to the limited energy supplies of nodes, in many applications like wireless sensor networks, energy-efficiency is crucial for extending the lifetime of these networks. We study the routing problem for multihop wireless ad hoc networks based on cooperative ...

Behrouz Maham; Are Hjørungnes

2009-03-01T23:59:59.000Z

58

Localized power-aware routing in linear wireless sensor networks  

Science Conference Proceedings (OSTI)

Energy-efficency is a key concern when designing protocols for wireless sensor networks (WSN). This is of particular importance in commercial applications where demonstrable return on investment is a crucial factor. One such commercial application that ... Keywords: energy efficiency, linear topology, localized protocol, routing, wireless sensor network

Marco Zimmerling; Waltenegus Dargie; Johnathan M. Reason

2008-05-01T23:59:59.000Z

59

ATPC: adaptive transmission power control for wireless sensor networks  

Science Conference Proceedings (OSTI)

Extensive empirical studies presented in this paper confirm that the quality of radio communication between low power sensor devices varies significantly with time and environment. This phenomenon indicates that the previous topology control solutions, ... Keywords: adaptive, feedback, link quality, transmission power control, wireless sensor network

Shan Lin; Jingbin Zhang; Gang Zhou; Lin Gu; John A. Stankovic; Tian He

2006-10-01T23:59:59.000Z

60

Recent progress on system studies for long distance power transmission  

SciTech Connect

Two possible applications of helium-cooled underground cables for power transmission were studied to determine network characteristics and estimated costs. The first involved power transmission at 345 kV from a Long Island nuclear power plant to a substation 43 miles away. The second appication examined the feasibility of a 350 mi-long 550 kV transmission line from Western Pennsylvania to Allentown and Philadelphia. For both systems computer simulations were used to study operating characteristics. A detailed cost analysis was made. The Long Island study concluded that helium-cooled cables were well suited for high-power transmission in a suburban area, that such a system using two trenches and separate refrigerator stations would be more reliable than a single trench system, and that cost could be optimized by using a less expensive cryogenic envelope. The Pennsylvania study showed that the helium-cooled cable was technically capable of performing as well as overhead power lines, but the cost of the underground cryogenic system is so much greater that such a system could not be economically justified for long distance transmission across open country-side. (LCL)

Forsyth, E B

1976-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Power Transmission and Distribution (EPTD) Smart Grid Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New York) Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New York) < Back Eligibility Agricultural Commercial Construction Industrial Institutional Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Home Weatherization Solar Wind Program Info State New York Program Type Grant Program Provider New York State Energy Research and Development Authority Up to $10 million in funds is available from NYSERDA to support research and engineering studies, product development and demonstration projects that improve the reliability, efficiency, quality, and overall performance

62

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appendix A Appendix A Consultation Letters Appendix A- Consultation Letters A-1 APPENDIX A CONTENTS A-2 Letter from the State Historic Preservation Office regarding Certificate of Environmental Compatibility Case No. 111: The Proposed Tucson Electric Power Company (TEP) South Substation to Nogales Transmission Line, Pima and Santa Cruz Counties, Arizona A-6 Letter from Tetra Tech, Inc. to El Paso Natural Gas, regarding the Proposed Tucson Electric Power Transmission Line Adjacent to an El Paso Natural Gas Company Pipeline A-8 Letter from Tetra Tech, Inc. to the Drug Enforcement Administration, regarding the Proposed Tucson Electric Power Transmission Line near Nogales, Arizona A-10 Letter from Tetra Tech, Inc. to the U.S. Immigration and Naturalization Service, regarding the

63

HVDC power transmission electrode siting and design  

Science Conference Proceedings (OSTI)

This research strives to shed light on the feasibility and practicality of using deep earth electrodes to permit their use for extended periods without adverse consequences. This report begins with a review of the fundamentals associated with current conduction in earth, including the various techniques available for measuring the earth`s electrical properties. The sources of existing data are discussed and some specific data for selected regions of the U.S. and Canada are reviewed as examples. Electrode technology and design issues are reviewed and recent experience gained by New England Power and Hydro-Quebec is discussed. The issues associated with direct current flowing in underground pipelines (and other facilities) are described and the present-day mitigation measures are evaluated. Suggestions are made for further R&D in the coordination of cathodic protection systems, an area that has evolved as an empirical, trial- and-error art more than a science.

Holt, R.J. [NDT Engineering, Inc., Shrewbury, MA (United States); Dabkowski, J. [Electro-Sciences, Inc., Crystal Lake, IL (United States); Hauth, R.L. [New England Power Service Co., Westborough, MA (United States)

1997-04-01T23:59:59.000Z

64

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

65

A Local Metric for Geographic Routing with Power Control in Wireless Networks  

E-Print Network (OSTI)

operating point of SNR that lies in the transitional region (where packet error rates are non state information. In particular, when electronic power is relatively low, the proposed algorithm can routing: the ratio of the product of the packet reception rate and distance improvement to the total power

Krishnamachari, Bhaskar

66

Power Electronics-Based Transmission Controllers Reference Book  

Science Conference Proceedings (OSTI)

EPRI is sponsoring development of a first edition of the EPRI Power Electronics-Based Transmission Controllers Reference Book. The book will provide a broad overview on power electronics-based controllers—with information on historical perspectives, basic design considerations, factory testing, site installations, commissioning, operating performance, operation and maintenance, and future trends. The document will assist users in planning, developing, installing, and utilizing this technology.

2005-12-02T23:59:59.000Z

67

Modeling strategic forward contracting in transmission constrained power markets  

Science Conference Proceedings (OSTI)

Taking the effects of transmission network into account, strategic forward contracting induced by the interaction of generation firms' strategies in the spot and forward markets is investigated. A two-stage game model is proposed to describe generation ... Keywords: equilibrium problem with equilibrium constraints (EPEC), nonlinear complementarity method, power market, strategic forward contracting

Wang Xian; Zhang Shaohua

2009-06-01T23:59:59.000Z

68

Electric power transmission for a Hanford Nuclear Energy Center (HNEC)  

SciTech Connect

The original study of transmission for a Hanford Nuclear Energy Center (HNEC), which was completed in September 1975, was updated in June 1978. The present 1983 revision takes cognizance of recent changes in the electric power situation of the PNW with respect to: (1) forecasts of load growth, (2) the feasibility of early use of 1100 kV transmission, and (3) the narrowing opportunities for siting nuclear plants in the region. The purpose of this update is to explore and describe additions to the existing transmission system that would be necessary to accommodate three levels of generation at HNEC. Comparisons with a PNW system having new thermal generating capacity distributed throughout the marketing region are not made as was done in earlier versions.

Harty, H.; Dowis, W.J.

1983-06-01T23:59:59.000Z

69

A routing protocol for power constrained networks with asymmetric links  

Science Conference Proceedings (OSTI)

In many instances, an ad hoc network consists of nodes with different hardware and software capabilities as well as power limitations. This is the case of ad hoc grids where devices such as desktops, laptops, robots, palmtops, sensors, and actuators ... Keywords: forwarding fitness function, m-limited forwarding, m-party proxy set

Guoqiang Wang; Yongchang Ji; Dan C. Marinescu; Damla Turgut

2004-10-01T23:59:59.000Z

70

HIGH FREQUENCY POWER TRANSMISSION LINE FOR CYCLOTRONS AND THE LIKE  

DOE Patents (OSTI)

High-frequency power transmission systems, particularly a stacked capacitance alternating power current transmission line wherein maximum utilization of the effective conductios skin of the line conductors is achieved while enabling a low impedance to be obtained are reported. The transmission line consists of a number of flat metal strips with interleaved dielectric strips. The metal dielectric strips are coiled spirally with the axis of the spiral extending along the length of the strips, and the alternating metal strips at the output end have outwardly extending aligned lugs which are directly strapped together and connected to the respective terminals on the load. At the input end of the transmission line, similarly, the alternate metal strips are directly strapped together and connected to an altereating current source. With the arrangement described each metal strip conducts on both sides, so that the metal strips are designed to have a thickness corresponding to twice the depth of the "skin effect" conducting lamina of each conductor at the source frequency.

Armstrong, W.J.

1954-04-20T23:59:59.000Z

71

Co-utilization of biomass and natural gas: a new route for power productin from biomass  

E-Print Network (OSTI)

Abstract Co-utilization of biomass and natural gas: a new route for power productin from biomass production is proposed in which biomass energy is used to partially reform natural gas in gas turbines. As a result, part of the natural gas fuel supply can be replaced by biomass while keeping the biomass

Glineur, François

72

Opportunistic routing in wireless sensor networks powered by ambient energy harvesting  

Science Conference Proceedings (OSTI)

Energy consumption is an important issue in the design of wireless sensor networks (WSNs) which typically rely on portable energy sources like batteries for power. Recent advances in ambient energy harvesting technologies have made it possible for sensor ... Keywords: Energy harvesting, Opportunistic routing, Wireless sensor networks

Zhi Ang Eu; Hwee-Pink Tan; Winston K. G. Seah

2010-12-01T23:59:59.000Z

73

Transmission needs across a fully renewable European power system  

E-Print Network (OSTI)

The residual load and excess power generation of 27 European countries with a 100% penetration of variable renewable energy sources are explored in order to quantify the benefit of power transmission between countries. Estimates are based on extensive weather data, which allows for modelling of hourly mismatches between the demand and renewable generation from wind and solar photovoltaics. For separated countries, balancing is required to cover around 24% of the total annual energy consumption. This number can be reduced down to 15% once all countries are networked together with uncon- strained interconnectors. The reduction represents the maximum possible benefit of transmission for the countries. The total Net Transfer Capacity of the unconstrained interconnectors is roughly twelve times larger than current values. However, constrained interconnector capacities six times larger than the current values are found to provide 97% of the maximum possible benefit of cooperation. This motivates a detailed investig...

Rodriguez, Rolando A; Andresen, Gorm B; Heide, Dominik; Greiner, Martin

2013-01-01T23:59:59.000Z

74

Firm-based Measurements of Market Power in Transmission-Constrained Electricity  

E-Print Network (OSTI)

Firm-based Measurements of Market Power in Transmission-Constrained Electricity Markets: Technical: Transmission constraints, electricity markets, market power, market power index, residual supply index. 1 approaches to analyzing firm-based market power con- sidering transmission constraints are proposed. One

Baldick, Ross

75

Power System Transmission Protection: Proposed R&D Projects  

Science Conference Proceedings (OSTI)

The U.S.-Canada task force on the August 14, 2003 power system outage that affected 50 million people concluded that inappropriate and uncoordinated relay protection settings were one of the three principal reasons that the cascade outage spread beyond Ohio and caused the widespread blackout. Based on input from utilities and other stakeholders at a recent protection workshop, this report proposes four R&D project to help meet needs in the transmission protection area.

2005-09-14T23:59:59.000Z

76

Central Wind Power Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities  

DOE Green Energy (OSTI)

The report addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America.

Porter, K.; Rogers, J.

2009-12-01T23:59:59.000Z

77

EACLE: Energy-Aware Clustering Scheme with Transmission Power Control for Sensor Networks  

Science Conference Proceedings (OSTI)

In this paper, we propose a new energy efficient clustering scheme with transmission power control named "EACLE" (Energy-Aware CLustering scheme with transmission power control for sEnsor networks) for wireless sensor networks, which are composed of ... Keywords: clustering, energy efficiency, transmission power control, wireless sensor network

Kentaro Yanagihara; Jumpei Taketsugu; Kiyoshi Fukui; Shigeru Fukunaga; Shinsuke Hara; Ken-Ichi Kitayama

2007-02-01T23:59:59.000Z

78

BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.  

SciTech Connect

Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

United States. Bonneville Power Administration.

1995-08-01T23:59:59.000Z

79

Application of the interphase power controller technology for transmission line power flow control  

SciTech Connect

This paper presents an application of the IPC technology for controlling power flows while maintaining the natural synchronizing capacity of transmission lines. The benefits for transmission systems are a substantial increase in steady-state transmission capability, lower losses and voltage support. An example based on the 500 kV Mead-Phoenix Project demonstrates the effectiveness of the IPC solution: the addition of a 370 Mvar capacitor in parallel with the two 500 kV phase-shifting transformers increases their maximum capability from 1,300 to 1,910 MW. The concepts presented are the results of the first phase of work leading to the development of an IPC using power electronics.

Brochu, J.; Beauregard, F.; Lemay, J.; Morin, G.; Pelletier, P. [Center d`Innovation sur le Transport d`Energie du Quebec, Varennes, Quebec (Canada)] [Center d`Innovation sur le Transport d`Energie du Quebec, Varennes, Quebec (Canada); Thallam, R.S. [Salt River Project, Phoenix, AZ (United States)] [Salt River Project, Phoenix, AZ (United States)

1997-04-01T23:59:59.000Z

80

Achieving Near Zero SSN Power Delivery Networks by Eliminating Power Planes and Using Constant Current Power Transmission Lines  

E-Print Network (OSTI)

method to remove SSN and to increase the per-pin data rate. However, to enable power transmissions lines of all, data transition causes the supply current to switch: the high-state of data draws current from the power supply network, but the low-state of data interrupts the current flow. Due to the terminating

Swaminathan, Madhavan

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Initial assessment: electromagnetic compatibility aspects of proposed SPS Microwave Power Transmission System (MPTS) operations  

DOE Green Energy (OSTI)

An analysis of major concerns with regard to the effects on radio and electronic systems by the proposed Microwave Power Transmission System for transmitting power from a satellite solar power station to earth is presented. (LCL)

Not Available

1978-02-01T23:59:59.000Z

82

Pulsed Power for a Dynamic Transmission Electron Microscope  

Science Conference Proceedings (OSTI)

Lawrence Livermore National Laboratory (LLNL) has converted a commercial 200kV transmission electron microscope (TEM) into an ultrafast, nanoscale diagnostic tool for material science studies. The resulting Dynamic Transmission Electron Microscope (DTEM) has provided a unique tool for the study of material phase transitions, reaction front analyses, and other studies in the fields of chemistry, materials science, and biology. The TEM's thermionic electron emission source was replaced with a fast photocathode and a laser beam path was provided for ultraviolet surface illumination. The resulting photoelectron beam gives downstream images of 2 and 20 ns exposure times at 100 and 10 nm spatial resolution. A separate laser, used as a pump pulse, is used to heat, ignite, or shock samples while the photocathode electron pulses, carefully time-synchronized with the pump, function as probe in fast transient studies. The device functions in both imaging and diffraction modes. A laser upgrade is underway to make arbitrary cathode pulse trains of variable pulse width of 10-1000 ns. Along with a fast e-beam deflection scheme, a 'movie mode' capability will be added to this unique diagnostic tool. This talk will review conventional electron microscopy and its limitations, discuss the development and capabilities of DTEM, in particularly addressing the prime and pulsed power considerations in the design and fabrication of the DTEM, and conclude with the presentation of a deflector and solid-state pulser design for Movie-Mode DTEM.

dehope, w j; browning, n; campbell, g; cook, e; king, w; lagrange, t; reed, b; stuart, b; Shuttlesworth, R; Pyke, B

2009-06-25T23:59:59.000Z

83

Sierra Pacific Power Company Alturas Transmission Line Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

transmission line to withstand expected maximum fault displacement. . ES-49 KesidualI*acf '.:, , ,,.,, .. .... ...... .. . ... . .. . .. .. . . . .. ,,. ,::.,. ,.,,, ,..,, lot...

84

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Fossil Energy U.S. Department of Energy 1000 Independence Avenue, S.W. Washington, DC 20585 Cooperating Agencies: U.S. Department of the Interior Bureau of Land Management U.S. Department of Agriculture Forest Service COVER SHEET Responsible Agency: U.S. Department of Energy (DOE), Office of Fossil Energy (FE) Cooperating Agencies: U.S. Department of Agriculture Forest Service (USFS), U.S. Department of the Interior Bureau of Land Management (BLM) Title: Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line Final Environmental Impact Statement (EIS) Location: Pima and Santa Cruz Counties, Arizona Contacts: For additional information on this Final Environmental Impact Statement (EIS), contact: For general information on the DOE

85

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SUMMARY Office of Fossil Energy U.S. Department of Energy 1000 Independence Avenue, S.W. Washington, DC 20585 Cooperating Agencies: U.S. Department of the Interior Bureau of Land Management U.S. Department of Agriculture Forest Service Tucson Electric Power Company Sahuarita-Nogales Transmission Line Final Environmental Impact Statement January 2005 DOE/EIS - 0336 BLM Reference No. AZA 31746 SUMMARY Office of Fossil Energy U.S. Department of Energy 1000 Independence Avenue, S.W. Washington, DC 20585 Cooperating Agencies: U.S. Department of the Interior Bureau of Land Management U.S. Department of Agriculture Forest Service COVER SHEET Responsible Agency: U.S. Department of Energy (DOE), Office of Fossil Energy (FE)

86

The aftermath of primary power and its implications for independent transmission in PJM  

Science Conference Proceedings (OSTI)

The recent decision by the Federal Energy Regulatory Commission in ''Primary Power'' will have fundamental ramifications for transmission investment in the far-reaching PJM footprint. This decision, which is pending on rehearing and will likely be appealed, will determine whether transmission projects that are entitled to regulated rate recovery under the PJM tariff can only be built by incumbent transmission owners and whether new independent transmission entities are limited to building transmission projects on a ''merchant'' basis. (author)

Farrah, Elias G.; Elstein, S. Shamai

2010-08-15T23:59:59.000Z

87

Synthesis of high intrinsic loss power aqueous ferrofluids of iron oxide nanoparticles by citric acid-assisted hydrothermal-reduction route  

Science Conference Proceedings (OSTI)

Monodispersed aqueous ferrofluids of iron oxide nanoparticle were synthesized by hydrothermal-reduction route. They were characterized by X-ray diffraction analysis, Fourier transform infrared spectroscopy, scanning and transmission electron microscopy and dynamic light scattering. The results showed that certain concentrations of citric acid (CA) are required to obtain only magnetic iron oxides with mean particle sizes around 8 nm. CA acts as a modulator and reducing agent in iron oxide formation which controls nanoparticle size. The XRD, magnetic and heating measurements showed that the temperature and time of hydrothermal reaction can affect the magnetic properties of obtained ferrofluids. The synthesized ferrofluids were stable at pH 7. Their mean hydrodynamic size was around 80 nm with polydispersity index (PDI) of 0.158. The calculated intrinsic loss power (ILP) was 9.4 nHm{sup 2}/kg. So this clean and cheap route is an efficient way to synthesize high ILP aqueous ferrofluids applicable in magnetic hyperthermia. - Graphical abstract: Monodispersed aqueous ferrofluids of iron oxide nanoparticles were synthesized by hydrothermal-reduction method with citric acid as reductant which is an efficient way to synthesize aqueous ferrofluids applicable in magnetic hyperthermia. Highlights: Black-Right-Pointing-Pointer Aqueous iron oxide ferrofluids were synthesized by hydrothermal-reduction route. Black-Right-Pointing-Pointer Citric acid acted as reducing agent and surfactant in the route. Black-Right-Pointing-Pointer This is a facile, low energy and environmental friendly route. Black-Right-Pointing-Pointer The aqueous iron oxide ferrofluids were monodispersed and stable at pH of 7. Black-Right-Pointing-Pointer The calculated intrinsic loss power of the synthesized ferrofluids was very high.

Behdadfar, Behshid, E-mail: bbehdadfar@ma.iut.ac.ir [Department of Materials Engineering, Isfahan University of Technology, Isfahan 84156-83111 (Iran, Islamic Republic of); Kermanpur, Ahmad [Department of Materials Engineering, Isfahan University of Technology, Isfahan 84156-83111 (Iran, Islamic Republic of); Sadeghi-Aliabadi, Hojjat [School of Pharmacy, Isfahan Pharmaceutical Research Center, Isfahan University of Medical Sciences, Isfahan (Iran, Islamic Republic of); Morales, Maria del Puerto [Instituto de Ciencia de Materiales de Madrid, CSIC, Cantoblanco 28049, Madrid (Spain); Mozaffari, Morteza [Department of Physics, Razi University, Kermanshah (Iran, Islamic Republic of)

2012-03-15T23:59:59.000Z

88

EIS-0377: Big Stone II Power Plant and Transmission Project | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Big Stone II Power Plant and Transmission Project 7: Big Stone II Power Plant and Transmission Project EIS-0377: Big Stone II Power Plant and Transmission Project SUMMARY A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission line and substation upgrades and modifications that would be required to support the addition of 600 MW of capacity within the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 24, 2009 EIS-0377: Record of Decision Big Stone II Power Plant and Transmission Project June 1, 2009 EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project October 26, 2007 EIS-0377: Supplemental Draft Environmental Impact Statement

89

Renewable Energy and Inter-Island Power Transmission (Presentation)  

Science Conference Proceedings (OSTI)

This presentation summarizes recent findings pertaining to inter-island connection of renewable and other energy sources, in particular, as these findings relate cable options, routing, specifications, and pros and cons.

Gevorgian, V.

2011-05-01T23:59:59.000Z

90

Forced cooling of underground electric power transmission lines : design manual  

E-Print Network (OSTI)

The methodology utilized for the design of a forced-cooled pipe-type underground transmission system is presented. The material is divided into three major parts: (1) The Forced-cooled Pipe-Type Underground Transmission ...

Brown, Jay A.

1978-01-01T23:59:59.000Z

91

Low loss conductor for ac or dc power transmission  

DOE Patents (OSTI)

A compact, easy to fabricate, noninductive, low surface magnetic field superconductor transmission line that has minimal stay fields is described.

Sampson, W.B.; Garber, M.

1973-03-13T23:59:59.000Z

92

An Experimental Study of Power Losses of an Automotive Manual Transmission.  

E-Print Network (OSTI)

??In this study, the influence of a variety of operating conditions on the power losses and efficiency of an automotive manual transmission was investigated experimentally.… (more)

Szweda, Timothy Andrew

2008-01-01T23:59:59.000Z

93

Trends In U.S. Electric Power Transmission  

SciTech Connect

The report provides an overview of the changes that are occurring in the industry to implement the goals of improved reliability and reduced congestion costs. As the electric industry works to become a more efficient market, transmission stands as a key link between the competitive generation and the regulated distribution sectors. In this role as a key link, transmission is a major focus of government efforts to improve reliability and reduce congestion costs. The scope of the report is to analyze the dominant reliability, investment, siting, and competition/open access trends that are occurring in the domestic electric transmission industry. Topics covered include: the impact of the 2003 Northeast blackout on reliability rules; the move from voluntary to mandatory reliability standards; the advent of real-time transmission system monitoring; ISO/RTO efforts to improve system reliability; the drivers of government intervention in transmission investment; the move towards incentive-based rates for transmission investment; legislative and regulatory efforts to spur transmission investment to support renewable energy resources; the emergence of merchant transmission; the need for federal backstop authority on regional transmission projects; the designation of national interest electric transmission corridors; FERC Orders on siting transmission; the need for changes in open access and competition regulations; FERC efforts to increase open access and competition; legislative efforts to increase competition; and, current competitive issues in the industry.

NONE

2007-11-15T23:59:59.000Z

94

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

95

Microsoft PowerPoint - WAPA Transmission Developments in NM ...  

NLE Websites -- All DOE Office Websites (Extended Search)

authorities: NM, CO, WY, KS, ND, UT, SD & ID Tasked with planning and financing of transmission lines within their respective states RETA has the additional requirement that...

96

Low loss conductor for ac or dc power transmission  

DOE Patents (OSTI)

The patent describes a compact, easy to fabricate, noninductive, low surface magnetic field superconductor transmission line that has minimal stray fields.

Sampson, W.B.; Garber, M.

1973-03-13T23:59:59.000Z

97

Focused beam routing protocol for underwater acoustic networks  

Science Conference Proceedings (OSTI)

Multi-hop transmission is considered for large coverage areas in bandwidth-limited underwater acoustic networks. In this paper, we present a scalable routing technique based on location information, and optimized for minimum energy per bit consumption. ... Keywords: power control, routing, underwater acoustic networks

Josep Miquel Jornet; Milica Stojanovic; Michele Zorzi

2008-09-01T23:59:59.000Z

98

Randomized flow model and centrality measure for electrical power transmission network analysis  

E-Print Network (OSTI)

1 Randomized flow model and centrality measure for electrical power transmission network analysis. Centrality measures can then be coherently defined. An example of application to an electrical power transmission system is presented. Acknowledgements This work has been partially funded by the Foundation pour

99

Maximal network reliability with optimal transmission line assignment for stochastic electric power networks via genetic algorithms  

Science Conference Proceedings (OSTI)

This study proposes a genetic algorithm based method integrating the minimal paths and the recursive sum of disjoint products to find maximal network reliability with optimal transmission line assignment for a stochastic electric power network. In our ... Keywords: Genetic algorithm, Maximal network reliability, Recursive sum of disjoint products, Stochastic electric power network, Transmission line assignment

Yi-Kuei Lin; Cheng-Ta Yeh

2011-03-01T23:59:59.000Z

100

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TEP Sahuarita-Nogales Transmission Line Final EIS TEP Sahuarita-Nogales Transmission Line Final EIS 2-4 Figure 2.1-1. Close-up of Alternative Study Corridors Near Sahuarita and Green Valley. Chapter 2- Proposed Action and Alternatives 2-5 Figure 2.1-2. Close-up of Alternative Study Corridors Near Amado. TEP Sahuarita-Nogales Transmission Line Final EIS 2-6 Figure 2.1-3. Close-up of Alternative Study Corridors Near Nogales. TEP Sahuarita-Nogales Transmission Line Final EIS 2-8 Figure 2.1-4. Western Corridor on the Coronado National Forest. Chapter 2-Proposed Action and Alternatives 2-13 Figure 2.1-5. Central Corridor on the Coronado National Forest. Chapter 2-Proposed Action and Alternatives 2-15 Figure 2.1-6. Crossover Corridor on the Coronado National Forest. TEP Sahuarita-Nogales Transmission Line Final EIS

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Underwater Acoustic Networks: Channel Models and Network Coding based Lower Bound to Transmission Power for Multicast  

E-Print Network (OSTI)

The goal of this paper is two-fold. First, to establish a tractable model for the underwater acoustic channel useful for network optimization in terms of convexity. Second, to propose a network coding based lower bound for transmission power in underwater acoustic networks, and compare this bound to the performance of several network layer schemes. The underwater acoustic channel is characterized by a path loss that depends strongly on transmission distance and signal frequency. The exact relationship among power, transmission band, distance and capacity for the Gaussian noise scenario is a complicated one. We provide a closed-form approximate model for 1) transmission power and 2) optimal frequency band to use, as functions of distance and capacity. The model is obtained through numerical evaluation of analytical results that take into account physical models of acoustic propagation loss and ambient noise. Network coding is applied to determine a lower bound to transmission power for a multicast scenario, fo...

Lucani, Daniel E; Stojanovic, Milica

2008-01-01T23:59:59.000Z

102

The integration of renewable energy sources into electric power transmission systems  

DOE Green Energy (OSTI)

Renewable energy technologies such as photovoltaics, solar thermal power plants, and wind turbines are nonconventional, environmentally attractive sources of energy that can be considered for electric power generation. Many of the areas with abundant renewable energy resources (very sunny or windy areas) are far removed from major load centers. Although electrical power can be transmitted over long distances of many hundreds of miles through high-voltage transmission lines, power transmission systems often operate near their limits with little excess capacity for new generation sources. This study assesses the available capacity of transmission systems in designated abundant renewable energy resource regions and identifies the requirements for high-capacity plant integration in selected cases. In general, about 50 MW of power from renewable sources can be integrated into existing transmission systems to supply local loads without transmission upgrades beyond the construction of a substation to connect to the grid. Except in the Southwest, significant investment to strengthen transmission systems will be required to support the development of high-capacity renewable sources of 1000 MW or greater in areas remote from major load centers. Cost estimates for new transmission facilities to integrate and dispatch some of these high-capacity renewable sources ranged from several million dollars to approximately one billion dollars, with the latter figure an increase in total investment of 35%, assuming that the renewable source is the only user of the transmission facility.

Barnes, P.R.; Dykas, W.P.; Kirby, B.J.; Purucker, S.L. [Oak Ridge National Lab., TN (United States); Lawler, J.S. [Univ. of Tennessee, Knoxville, TN (United States)

1995-07-01T23:59:59.000Z

103

An empirical evaluation of battery power consumption for streaming data transmission to mobile devices  

Science Conference Proceedings (OSTI)

Internet streaming applications are becoming increasingly popular on mobile devices. However, receiving streaming services on mobile devices is often constrained by their limited battery power supply. Various techniques have been proposed to save battery ... Keywords: battery power consumption, data transmission, internet mobile streaming, power saving

Yao Liu; Lei Guo; Fei Li; Songqing Chen

2011-11-01T23:59:59.000Z

104

EPRI Power Electronics-Based Transmission Controllers Reference Book ("The Gold Book")  

Science Conference Proceedings (OSTI)

EPRI is sponsoring development of a first edition of the EPRI Power Electronics-Based Transmission Controllers Reference Book. This report is the most recent draft of a chapter for the "Gold Book," an authoritative guide for utilities and others who install and maintain power electronics equipment to increase power transfer capability.

2009-12-23T23:59:59.000Z

105

A Service-Oriented Architecture for Electric Power Transmission System Asset Management  

E-Print Network (OSTI)

Modern electric power systems comprising of power transmission and distribution grids consist of a large in operating modern high-voltage electric power sys- tems. The proposed framework integrates real-time data of equipment. The failure of critical equipment can adversely impact the entire distribution grid and increase

Honavar, Vasant

106

Energy-balanced cooperative routing in multihop wireless networks  

Science Conference Proceedings (OSTI)

Cooperative communication (CC) allows multiple nodes to simultaneously transmit the same packet to the receiver so that the combined signal at the receiver can be correctly decoded. Since the CC can reduce the transmission power and extend the transmission ... Keywords: Cooperative routing, Energy balancing, Multihop networks

Siyuan Chen; Yang Li; Minsu Huang; Ying Zhu; Yu Wang

2013-08-01T23:59:59.000Z

107

Power transmission investment analysis: a new financial Evaluation framework for South Africa  

Science Conference Proceedings (OSTI)

A proposed framework for power transmission expansion projects in South Africa incorporates the modeling of project options and uncertainties, Monte Carlo simulations, real option analysis, and decision analysis, based on a foundation of strategic analysis. (author)

Maboke, Silky Ntombifuthi; Kachienga, Michael Ogembo

2008-05-15T23:59:59.000Z

108

Power Line Communication as a Transmission Medium for OpenADR...  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Line Communication as a Transmission Medium for OpenADR Signals Speaker(s): Javier Matanza Domingo Date: December 14, 2011 - 1:30pm Location: 90-3075 Seminar HostPoint of...

109

Supplying Baseload Power and Reducing Transmission Requirements by Interconnecting Wind Farms  

Science Conference Proceedings (OSTI)

Wind is the world’s fastest growing electric energy source. Because it is intermittent, though, wind is not used to supply baseload electric power today. Interconnecting wind farms through the transmission grid is a simple and effective way of ...

Cristina L. Archer; Mark Z. Jacobson

2007-11-01T23:59:59.000Z

110

Adaptive neurofuzzy inference system-based pollution severity prediction of polymeric insulators in power transmission lines  

Science Conference Proceedings (OSTI)

This paper presents the prediction of pollution severity of the polymeric insulators used in power transmission lines using adaptive neurofuzzy inference system (ANFIS) model. In this work, laboratory-based pollution performance tests were carried out ...

C. Muniraj; S. Chandraseka

2011-01-01T23:59:59.000Z

111

Evaluation of power system security and development of transmission pricing method  

E-Print Network (OSTI)

The electric power utility industry is presently undergoing a change towards the deregulated environment. This has resulted in unbundling of generation, transmission and distribution services. The introduction of competition into unbundled electricity services may lead system operation closer to its security boundaries resulting in smaller operating safety margins. The competitive environment is expected to lead to lower price rates for customers and higher efficiency for power suppliers in the long run. Under this deregulated environment, security assessment and pricing of transmission services have become important issues in power systems. This dissertation provides new methods for power system security assessment and transmission pricing. In power system security assessment, the following issues are discussed 1) The description of probabilistic methods for power system security assessment 2) The computation time of simulation methods 3) on-line security assessment for operation. A probabilistic method using Monte-Carlo simulation is proposed for power system security assessment. This method takes into account dynamic and static effects corresponding to contingencies. Two different Kohonen networks, Self-Organizing Maps and Learning Vector Quantization, are employed to speed up the probabilistic method. The combination of Kohonen networks and Monte-Carlo simulation can reduce computation time in comparison with straight Monte-Carlo simulation. A technique for security assessment employing Bayes classifier is also proposed. This method can be useful for system operators to make security decisions during on-line power system operation. This dissertation also suggests an approach for allocating transmission transaction costs based on reliability benefits in transmission services. The proposed method shows the transmission transaction cost of reliability benefits when transmission line capacities are considered. The ratio between allocation by transmission line capacity-use and allocation by reliability benefits is computed using the probability of system failure.

Kim, Hyungchul

2003-08-01T23:59:59.000Z

112

AC-to-DC Power Transmission Line Conversion  

Science Conference Proceedings (OSTI)

System planners have grown more interest in the prospect of converting ac transmission lines to dc as transfer constraints become more severe and they increasingly recognize dc as a means to improve ac system performance. Two factors have influenced the economic case for conversion. The first is development of a new (tripole) dc configuration that allows dc to make full use of all three ac phase positions without the need for earth return. The second is the realization that converting an ac line to dc ma...

2010-11-10T23:59:59.000Z

113

High-voltage DC transmission: a power electronics workhorse  

Science Conference Proceedings (OSTI)

Thyristor-based HVDC converter technology is used for highly reliable power transfer across natural or national boundaries or between AC systems designed for different frequencies or incompatible frequency controls. The author discusses the benefits ...

N. G. Hingorani

1996-04-01T23:59:59.000Z

114

Transmission INTRODUCTION  

E-Print Network (OSTI)

Transmission INTRODUCTION An electrical power system requires constant, second by second, balancing to maintain control over the transmission system can result in failure of the entire electrical system of supply, demand, and transmission capability. Transmission system operators are primarily responsible

115

Dynamic and short-circuit power of CMOS gates driving lossless transmission lines  

E-Print Network (OSTI)

Abstract—The dynamic and short-circuit power consumption of a complementary metal–oxide–semidconductor (CMOS) gate driving an inductance–capacitance (LC) transmission line as a limiting case of an RLC transmission line is investigated in this paper. Closed-form solutions for the output voltage and shortcircuit power of a CMOS gate driving an LC transmission line are presented. A closed form solution for the short-circuit power is also presented. These solutions agree with circuit simulations within 11 % error for a wide range of transistor widths and line impedances for a 0.25-"m CMOS technology. The ratio of the short circuit to dynamic power is shown to be less than 7 % for CMOS gates driving LC transmission lines where the line is matched or underdriven. The total power consumption is expected to decrease as inductance effects becomes more significant as compared to a resistance–capacitance (RC)-dominated interconnect line. Index Terms—CMOS, dynamic, interconnect, LC, power dissipation, RC, RLC, short-circuit, transmission lines.

Yehea I. Ismail; Eby G. Friedman; Senior Member; Jose Luis Neves

1999-01-01T23:59:59.000Z

116

Simulation of atmospheric overvoltages on 400kV power lines in transmission system  

Science Conference Proceedings (OSTI)

External overvoltages are unambiguously caused by atmospheric overvoltages on overhead lines an emerges during storms. The paper presents simulation results of atmospheric overvoltages in slovak transmission system, which were realized in purpose of ... Keywords: overhead power lines, overvoltages, power system, surge arrester

Martin Mucha; Žaneta Eleschová; Anton Belá?; František Janí?ek; Peter Szathmáry

2006-09-01T23:59:59.000Z

117

Electrical Collection and Transmission Systems for Offshore Wind Power: Preprint  

SciTech Connect

The electrical systems needed for offshore wind farms to collect power from wind turbines--and transmit it to shore--will be a significant cost element of these systems. This paper describes the development of a simplified model of the cost and performance of such systems.

Green, J.; Bowen, A.; Fingersh, L.J.; Wan, Y.

2007-03-01T23:59:59.000Z

118

The effect of the transmission grid on market power  

SciTech Connect

If competition could extend without hindrance through the entire extent of an electrically connected power grid, the US would have just two electricity markets, each with a uniform price. These markets would be competitive indeed. Unfortunately, losses and congestion present barriers to competition and thereby provide the likelihood of significantly increased market power. This paper begins the analysis of congestion as it affects the physical extent of markets and thereby affects the degree of market power. This is new territory; very little has previously been written in this area. Although the theoretical developments reported here rely on complex economic analysis, and although the market behaviors described are extremely subtle, several broad generalizations relevant to policy analysis can be made. From these generalizations one major policy conclusion can be drawn: In an unregulated market it will be socially beneficial to build a grid that is more robust than what is optimal in a regulated environment. Unused capacity may be needed. For a line to support full competition it may need to have a capacity that is much greater than the flow that will take place on it under full competition. Markets do not have sharp boundaries. Even with only one line the two busses may be in different regions, the same region, or partially in each other`s region. Increasing capacity is more effective on a small line. If connecting two busses with a very strong line will reduce market power, then the first MW of connecting capacity will have the most impact and each additional MW will have less. A congested line will cut a market into two non-competing regions. In each region the generators will markup according to the elasticity of the demand in only their region. A generator may reduce output in order to congest a line and increase its market power.

Stoft, S.

1997-05-01T23:59:59.000Z

119

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ES-1 ES-1 ES.0 Summary In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). The proposed Project would be constructed by Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River Energy, Heartland Consumers Power District, Montana-Dakota Utilities Co., Southern Minnesota Municipal Power Agency, and

120

Transmission Benefits of Co-Locating Concentrating Solar Power and Wind  

DOE Green Energy (OSTI)

In some areas of the U.S. transmission constraints are a limiting factor in deploying new wind and concentrating solar power (CSP) plants. Texas is an example of one such location, where the best wind and solar resources are in the western part of the state, while major demand centers are in the east. The low capacity factor of wind is a compounding factor, increasing the relative cost of new transmission per unit of energy actually delivered. A possible method of increasing the utilization of new transmission is to co-locate both wind and concentrating solar power with thermal energy storage. In this work we examine the benefits and limits of using the dispatachability of thermal storage to increase the capacity factor of new transmission developed to access high quality solar and wind resources in remote locations.

Sioshansi, R.; Denholm, P.

2012-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Multi-channel transmission with efficient delivery of routing information in maritime WiMAX mesh networks  

Science Conference Proceedings (OSTI)

There is a lack of broadband wireless network in sea to meet the increasing needs of modern maritime users and we have envisaged WiMAX mesh networks for high-speed and low-cost ship-to-ship/shore communications. In such a maritime WiMAX mesh network, ... Keywords: IEEE Std 802.16-2004, broadband wireless access, maritime communications, mesh network, multi-channel transmission

Ming-Tuo Zhou; Hiroshi Harada; Peng-Yong Kong; Chee-Wei Ang; Yu Ge; J. S. Pathmasuntharam

2009-06-01T23:59:59.000Z

122

Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed.

N /A

2002-08-16T23:59:59.000Z

123

Power Line Communication as a Transmission Medium for OpenADR Signals  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Line Communication as a Transmission Medium for OpenADR Signals Power Line Communication as a Transmission Medium for OpenADR Signals Speaker(s): Javier Matanza Domingo Date: December 14, 2011 - 1:30pm Location: 90-3075 Seminar Host/Point of Contact: Maya Minamihara Power Line Communication (PLC) is currently considered an emerging technology and is attracting the attention of the scientific community due to the promise of new ways to transmit information. Since this transmission path reaches wherever electricity is present, one of the main motivations is its use in all kinds of energy-related applications. Some examples are: remote-metering, remote-control and demand management. However, not everything about PLC is advantageous, due to the fact that it uses a physical media, which was not designed for transmit information, and it

124

The Reliability Investigation on ACSR Splice Connector Systems Used in Overhead Power transmission Lines  

SciTech Connect

Due to material discontinuity and inherited forming mechanism from a crimped-type splice connector, the associated conductor-connector system is highly sensitive to system components aging, especially during high-temperature operations. Furthermore, due to the increase in power demand and limited investment in new infrastructure, existing overhead power transmission lines often need to operate at temperatures higher than the original designed values. This has led to the accelerated aging and degradation of conductor-connector systems. The implications of connector aging are two-fold: (1) significant increase in resistivity of the splice connector and (2) significant reduction in the connector clamping strength. Therefore, splice connectors are one of the weakest links in the electric power transmission infrastructure. In this paper we will discuss the reliability of splice connector systems, including both single stage and two stage splice connectors, used in ACSR conductor of transmission lines under high temperature operations.

Wang, Jy-An John [ORNL; Jiang, Hao [ORNL; Ren, Fei [ORNL

2012-01-01T23:59:59.000Z

125

Wallula-McNary Transmission Line Project and Wallula Power Project EIS (DOE/EIS-0030)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECORD OF DECISION for the Wallula-McNary Transmission Line Project and Wallula Power Project THE DECISION The Bonneville Power Administration (BPA) has decided to implement its portion of the proposed action identified in the Wallula Power Project and Wallula-McNary Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0330, August 2002). The proposed action includes construction of the Wallula Power Project (Wallula Project) that has been proposed by Wallula Generation, LLC (Wallula LLC). The proposed Wallula Project is a 1,300- megawatt (MW) natural-gas-fired, combined-cycle turbine power plant that Wallula LLC is planning to construct on a site near the Columbia River in Walla Walla County, Washington, approximately eight miles south of the City of Pasco. BPA's portion of the proposed action

126

Stabilizing control of parallel AC-DC power transmission systems by approximate switching curve  

SciTech Connect

A method to improve the transient stability of bulk power transmission system is presented. The method stabilizes the control of parallel ac-dc transmission systems using an approximate switching curve. The optimal switching curve is approximated by a power series and the resulting switching curve is determined independent of type and duration of faults that occur to the system. In addition, coefficients of the switching curve can be calculated on a off-line basis which allows use of simple on-line algebraic calculations in emergency conditions.

Ichiyanagi, K.; Kobayashi, H.; Kakehu, H.

1980-01-01T23:59:59.000Z

127

Control system and method for a power delivery system having a continuously variable ratio transmission  

DOE Patents (OSTI)

A control system and method for a power delivery system, such as in an automotive vehicle, having an engine coupled to a continuously variable ratio transmission (CVT). Totally independent control of engine and transmission enable the engine to precisely follow a desired operating characteristic, such as the ideal operating line for minimum fuel consumption. CVT ratio is controlled as a function of commanded power or torque and measured load, while engine fuel requirements (e.g., throttle position) are strictly a function of measured engine speed. Fuel requirements are therefore precisely adjusted in accordance with the ideal characteristic for any load placed on the engine. 4 figs.

Frank, A.A.

1984-07-10T23:59:59.000Z

128

Control system and method for a power delivery system having a continuously variable ratio transmission  

DOE Patents (OSTI)

A control system and method for a power delivery system, such as in an automotive vehicle, having an engine coupled to a continuously variable ratio transmission (CVT). Totally independent control of engine and transmission enable the engine to precisely follow a desired operating characteristic, such as the ideal operating line for minimum fuel consumption. CVT ratio is controlled as a function of commanded power or torque and measured load, while engine fuel requirements (e.g., throttle position) are strictly a function of measured engine speed. Fuel requirements are therefore precisely adjusted in accordance with the ideal characteristic for any load placed on the engine.

Frank, Andrew A. (1034 Hillside Ave., Madison, WI 53705)

1984-01-01T23:59:59.000Z

129

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

130

Application of EPRI's Transmission Reliability Evaluation for Large-Scale Systems (TRELSS) Program to Bonneville Power Administration System  

Science Conference Proceedings (OSTI)

Delivering power at the lowest cost while maintaining an acceptable level of reliability requires careful transmission planning. EPRI's Transmission Reliability Evaluation for Large-Scale Systems (TRELSS) can be used to analyze and quantify the reliability of bulk power systems to help determine the need for new transmission facilities. This report presents the results of reliability analyses for Bonneville Power Administration (BPA) using the TRELSS program.

1997-11-11T23:59:59.000Z

131

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.  

SciTech Connect

BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

132

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lead Agency: U.S. Department of Energy, Western Area Power Administration Lead Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of Agriculture, Rural Utilities Service U.S. Department of Defense, Army Corps of Engineers Title: Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement Location: Proposed Big Stone II Plant: Big Stone City, South Dakota Proposed Transmission Facilities: Northeastern South Dakota and Southwestern Minnesota Contacts: For additional information on this Supplemental Draft Environmental Impact Statement, or to receive a copy, contact: For general information on the DOE National Environmental Policy Act process, write or call: Ms. Nancy Werdel Western Area Power Administration

133

Magnet Lattice Design for the Transmission of Power Using Particle Beams  

SciTech Connect

As the amount of electricity generated by renewable energy sources continues to increase, the current method of power transmission will not serve as an adequate method for transmitting power over very long distances. A new method for transmitting power is proposed using particle beams in a storage ring. Particle beams offer an incredibly energy efficient alternative to transmission lines in transmitting power over very long distances. A thorough investigation of the magnet lattice design for this storage ring is presented. The design demonstrates the ability to design a ring with stable orbits over a 381.733 km circumference. Double bend achromats and FODO cells are implemented to achieve appropriate {beta} functions and dispersion functions for 9-11 GeV electron beams.

Marley, Daniel; /North Carolina State U. /SLAC

2012-08-24T23:59:59.000Z

134

POWER EFFICIENT H.263 VIDEO TRANSMISSION OVER WIRELESS CHANNELS Xiaoan Lu, Yao Wang, and Elza Erkip  

E-Print Network (OSTI)

probability that a symbol is at bad state B), pB,G (transition probability from State B to G), N0,B and N0,G (noise powers at dif- ferent states) and d, the distance between the mobile unit and the base station is given by Pc(r, Rs), where r = k n is the channel code rate. The transmission power is Pt(r, Rs, Eb), #12

Erkip, Elza

135

EPRI Power Electronics-Based Transmission Controllers Reference Book ("The Gold Book")  

Science Conference Proceedings (OSTI)

EPRI is sponsoring development of a first edition of the EPRI Power Electronics-Based Transmission Controllers Reference Book. The reference book will provide a broad overview on power electronics-based controllers0150with information on historical perspectives, basic design considerations, factory testing, site installations, commissioning, operating performance, operation and maintenance, and future trends. The book will assist users in planning, developing, installing, and utilizing this technology.

2006-12-05T23:59:59.000Z

136

A Power Transmission Line Fault Distance Estimation VLSI Chip: Design and Defect Tolerance  

Science Conference Proceedings (OSTI)

This paper presents a system-on-a-chip for fault detection and fault-distance-estimation for power transmission lines in the smart grid. Toward this goal we have designed and fabricated three chips: PGS4, PGS5 and PGS6, each successively more advanced ... Keywords: Smart grid, fault distance, arcing fault, system on a chip, defect tolerance, Radojevic algorithm.

E. MacLean; V. K. Jain

2011-10-01T23:59:59.000Z

137

Analysis and minimization of power-transmission loss in locally daisy-chained systems by local energy buffering  

Science Conference Proceedings (OSTI)

Power-transmission loss can be a severe problem for low-power embedded systems organized in a daisy-chain topology. The loss can be so high that it can result in failure to power the load in the first place. The first contribution of this article is ... Keywords: Power distribution, daisy-chaining, embedded systems, energy storage, power management, sensors

Sehwan Kim; Pai H. Chou

2013-07-01T23:59:59.000Z

138

Theoretical and experimental investigation of axial power extraction from a magnetically insulated transmission line oscillator  

SciTech Connect

The utility of the magnetically insulated transmission line oscillator (MILO) as a high power microwave source depends on how efficiently power can be extracted from it. We have designed a slow-wave stepped transformer for the purpose of axially extracting microwave power from a 3.6 GHz coaxial MILO. The slow-wave transformer design was optimized using particle-in-cell simulation, and tested in experiments performed on the HPM Simulation Division's GEMINI and GYPSY water Blumlein pulse power sources. In this paper we summarize the slow-wave stepped transformer design, and describe MILO axial power extraction experiments which yielded up to 300 MW of radiated power. 10 refs., 4 figs., 2 tabs.

Lemke, R.W.; DeMuth, G.E.; Biggs, A.W. (Sandia National Labs., Albuquerque, NM (USA); Air Force Weapons Lab., Kirtland AFB, NM (USA); Alabama Univ., Huntsville, AL (USA). Dept. of Electrical and Computer Engineering)

1989-01-01T23:59:59.000Z

139

Magnetohydrodynamic electromagnetic pulse (MHD-EMP) interaction with power transmission and distribution systems  

SciTech Connect

This report discusses the effects of the late-time high-altitude electromagnetic pulse (HEMP) on electrical transmission and distribution (T D) systems. This environment, known as the magnetohydrodynamic electromagnetic pulse (MHD-EMP), is a very slowly varying electric field induced in the earth's surface, similar to the field induced by a geomagnetic storm. It can result in the flow of a quasi-dc current in grounded power lines and in the subsequent magnetic saturation of transformers. This saturation, in turn, causes 6-Hz harmonic distortion and an increase in the reactive power required by generation facilities. This report analyzes and discusses these phenomena. The MHD-EMP environment is briefly discussed, and a simplified form of the earth-induced electric field is developed for use in a parametric study of transmission line responses. Various field coupling models are described, and calculated results for the responses of both transmission- and distribution-class power lines are presented. These calculated responses are compared with measurements of transformer operation under dc excitation to infer the MHD-EMP response of these power system components. It is found that the MHD-EMP environment would have a marked effect on a power system by inducing up to several hundreds of amperes of quasi-dc current on power lines. These currents will cause transformers to saturate which could result in excessive harmonic generation, voltage swings, and voltage suppression. The design of critical facilities which are required to operate during and after MHD-EMP events will have to be modified in order to mitigate the effects of these abnormal power system conditions.

Tesche, F.M. (Tesche (F.M.), Dallas, TX (United States)) [Tesche (F.M.), Dallas, TX (United States); Barnes, P.R. (Oak Ridge National Lab., TN (United States)) [Oak Ridge National Lab., TN (United States); Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Dept. of Electrical Engineering) [Georgia Inst. of Tech., Atlanta, GA (United States). Dept. of Electrical Engineering

1992-02-01T23:59:59.000Z

140

Magnetohydrodynamic electromagnetic pulse (MHD-EMP) interaction with power transmission and distribution systems  

Science Conference Proceedings (OSTI)

This report discusses the effects of the late-time high-altitude electromagnetic pulse (HEMP) on electrical transmission and distribution (T&D) systems. This environment, known as the magnetohydrodynamic electromagnetic pulse (MHD-EMP), is a very slowly varying electric field induced in the earth`s surface, similar to the field induced by a geomagnetic storm. It can result in the flow of a quasi-dc current in grounded power lines and in the subsequent magnetic saturation of transformers. This saturation, in turn, causes 6-Hz harmonic distortion and an increase in the reactive power required by generation facilities. This report analyzes and discusses these phenomena. The MHD-EMP environment is briefly discussed, and a simplified form of the earth-induced electric field is developed for use in a parametric study of transmission line responses. Various field coupling models are described, and calculated results for the responses of both transmission- and distribution-class power lines are presented. These calculated responses are compared with measurements of transformer operation under dc excitation to infer the MHD-EMP response of these power system components. It is found that the MHD-EMP environment would have a marked effect on a power system by inducing up to several hundreds of amperes of quasi-dc current on power lines. These currents will cause transformers to saturate which could result in excessive harmonic generation, voltage swings, and voltage suppression. The design of critical facilities which are required to operate during and after MHD-EMP events will have to be modified in order to mitigate the effects of these abnormal power system conditions.

Tesche, F.M. [Tesche (F.M.), Dallas, TX (United States); Barnes, P.R. [Oak Ridge National Lab., TN (United States); Meliopoulos, A.P.S. [Georgia Inst. of Tech., Atlanta, GA (United States). Dept. of Electrical Engineering

1992-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and and Wallula - McNary Transmission Line Project Final Environmental Impact Statement DOE/EIS-0330 Lead Agencies Bonneville Power Administration Washington State Energy Facility Site Evaluation Council Cooperating Agencies Bureau of Land Management U.S. Fish and Wildlife Service August 2002 EFSEC Washington State Energy Facility Site Evaluation Council August 2002 Dear Reader: Enclosed for your reference is the abbreviated form Final Environmental Impact Statement (FEIS) for the proposed Wallula Power Project and Wallula-McNary Transmission Line Project. This document is designed to supplement or correct information provided in the Draft Environmental Impact Statement (DEIS). The proponent, Wallula Generation, LLC, has requested to build a 1,300-megawatt, gas-fired

142

Conceptual design of air-core superconducting power transformer for cable transmission system  

Science Conference Proceedings (OSTI)

The air-core superconducting transformer, which has a large magnetizing current, has been proposed as a power transformer that has the function as a shunt reactor. In this paper, the basic design procedure for the air-core superconducting transformer is presented. By using this procedure, 500/{radical}(3kV)--66/{radical}(3kV)--300 MVA single phase air-core transformer is designed for a model cable transmission system. Then, the performance of this transformer in the model cable transmission system is analyzed, and it is confirmed that the air-core superconducting transformer can function as a shunt reactor in addition to the principal as a power transformer.

Yamaguchi, Hiroshi; Sato, Yukihiko; Kataoka, Teruo [Tokyo Inst. of Tech. (Japan). Dept. of Electrical and Electronic Engineering

1996-04-01T23:59:59.000Z

143

Termination for a superconducting power transmission line including a horizontal cryogenic bushing  

DOE Patents (OSTI)

A termination for a superconducting power transmission line is disclosed which is comprised of a standard air entrance insulated vertical bushing with an elbow, a horizontal cryogenic bushing linking the pressurized cryogenic cable environment to the ambient temperature bushing and a stress cone which terminates the cable outer shield and transforms the large radial voltage gradient in the cable dielectric into a much lower radial voltage gradient in the high density helium coolant at the cold end of the cryogenic bushing.

Minati, Kurt F. (Northport, NY); Morgan, Gerry H. (Patchogue, NY); McNerney, Andrew J. (Shoreham, NY); Schauer, Felix (Upton, NY)

1984-01-01T23:59:59.000Z

144

Horizontal cryogenic bushing for the termination of a superconducting power-transmission line  

DOE Patents (OSTI)

A termination for a superconducting power transmission line is disclosed which is comprised of a standard air entrance insulated vertical bushing with an elbow, a horizontal cryogenic bushing linking the pressurized cryogenic cable environment to the ambient temperature bushing and a stress cone which terminated the cable outer shield and transforms the large radial voltage gradient in the cable dielectric into a much lower radial voltage gradient in the high density helium coolant at the cold end of the cryogenic bushing.

Minati, K.F.; Morgan, G.H.; McNerney, A.J.; Schauer, F.

1982-07-29T23:59:59.000Z

145

30 MJ superconducting magnetic energy storage performance on the Bonneville Power Administration utility transmission system*  

DOE Green Energy (OSTI)

The 30 MJ, 10 MW superconducting magnetic energy storage (SMES) system was devised to interact in the Western U.S. Power System as an alternate means to damp unstable oscillations at 0.35 Hz on the Pacific HVAC Intertie. The SMES unit was installed at the Tacoma Substation of the Bonneville Power Administration (BPA). The operating limits of the 30 MJ SMES unit were established, and different means of controlling real and reactive power were tested. The unit can follow a sinusoidal power demand signal with an amplitude of up to 8.6 MW with the converter working in a 12 pulse mode. When the converter operates in the constant VAR mode, a time varying real power demand signal of up to 5 MW can be met. Experiments showed that the Pacific AC Intertie has current and reactive power variations of the same frequency as the modulating frequency of the SMES device. Endurance tests were run to assess the reliability of the SMES subsystems with a narrow band noise input, which is characteristic of the modulation signal for stabilizer operation. In this mode, the energy of the power spectrum is not concentrated at one frequency to avoid exciting a resonance frequency of the ac transmission system. During the endurance tests, parameters of the ac power system were determined. Accurate power system data are necessary for tuning the control algorithm so that the SMES unit can operate in the closed loop stabilizer mode.

Rogers, J.D.; Boenig, H.J.

1984-08-01T23:59:59.000Z

146

Impact of Transmission on Resource Adequacy in Systems with Wind and Solar Power: Preprint  

DOE Green Energy (OSTI)

Variable generation is on track to become a significant contributor to electric power systems worldwide. Thus, it is important to analyze the effect that renewables will have on the reliability of systems. In this paper we present a new tool being implemented at the National Renewable Energy Laboratory, which allows the inclusion of variable generation in the power system resource adequacy. The tool is used to quantify the potential contribution of transmission to reliability in highly interconnected systems and an example is provided using the Western Interconnection footprint.

Ibanez, E.; Milligan, M.

2012-02-01T23:59:59.000Z

147

Bang-bang-type optimal constant current control of parallel ac-dc power transmission systems  

SciTech Connect

The transient stability of an ac-dc hybrid system can be improved greatly by controlling the power flow of the dc transmission line. In this study the optimal changeover curve of dc current setting value on the phase plane with a quadratic curve are approximated. The coefficients of this curve are calculated in advance taking into account the loading condition of the power system and hence the proposed control scheme can be used for emergency control of the power system. The main conclusions from this study were that: to facilitate transient stability analysis, the dc transmission line is represented by equivalent load admittances, which vary every second with the operating condition of the transmission line; the action of the speed governor increases the damping coefficient of the power system and reduces the control time which means that the admissible range of the dc current setting value can be reduced by increasing the governor gain; and the optimal change-over curve of the dc current setting value is approximated by a quadratic curve, whose coefficients can be calculated in advance taking into account the loading condition of the power system. The suboptimal changeover curve thus obtained makes it possible to change the setting value of dc current without time delay in emergency condition. While the case of three-phase short-circuit fault was specifically discussed, it is possible to extend the results obtained to the case of successful or unsuccessful reclosing. The proposed method could also be applied to multimachine systems by using equivalent network reduction methods.

Kobayashi, H.; Ichiyanagi, K.

1977-01-01T23:59:59.000Z

148

Broadcast routing in wireless sensor networks with dynamic power management and multi-coverage backbones  

Science Conference Proceedings (OSTI)

In a wireless sensor network (WSN), nodes are power constrained. As a consequence, protocols must be energy efficient to prolong the network lifetime while keeping some quality-of-service (QoS) requirements. In WSNs, most protocols resort to the broadcast ... Keywords: Battery capacity recovery, Battery model, Dynamic power management, Multi-coverage backbones, Topology control, Wireless sensor networks

Paulo Sérgio Sausen; Marco Aurélio Spohn; Angelo Perkusich

2010-03-01T23:59:59.000Z

149

A Majorization-Minimization Approach to Design of Power Transmission Networks  

E-Print Network (OSTI)

We propose an optimization approach to design cost-effective electrical power transmission networks. That is, we aim to select both the network structure and the line conductances (line sizes) so as to optimize the trade-off between network efficiency (low power dissipation within the transmission network) and the cost to build the network. We begin with a convex optimization method based on the paper "Minimizing Effective Resistance of a Graph" [Ghosh, Boyd & Saberi]. We show that this (DC) resistive network method can be adapted to the context of AC power flow. However, that does not address the combinatorial aspect of selecting network structure. We approach this problem as selecting a subgraph within an over-complete network, posed as minimizing the (convex) network power dissipation plus a non-convex cost on line conductances that encourages sparse networks where many line conductances are set to zero. We develop a heuristic approach to solve this non-convex optimization problem using: (1) a continua...

Johnson, Jason K

2010-01-01T23:59:59.000Z

150

Dynamic power allocation and routing for satellite and wireless networks with time varying channels  

E-Print Network (OSTI)

Satellite and wireless networks operate over time varying channels that depend on attenuation conditions, power allocation decisions, and inter-channel interference. In order to reliably integrate these systems into a high ...

Neely, Michael J. (Michael James), 1975-

2004-01-01T23:59:59.000Z

151

A Distributed Power Control and Transmission Rate Allocation Algorithm over Multiple Channels  

E-Print Network (OSTI)

In this paper, we consider multiple channels and wireless nodes with multiple transceivers. Each node assigns one transmitter at each available channel. For each assigned transmitter the node decides the power level and data rate of transmission in a distributed fashion, such that certain Quality of Service (QoS) demands for the wireless node are satisfied. More specifically, we investigate the case in which the average SINR over all channels for each communication pair is kept above a certain threshold. A joint distributed power and rate control algorithm for each transmitter is proposed that dynamically adjusts the data rate to meet a target SINR at each channel, and to update the power levels allowing for variable desired SINRs. The algorithm is fully distributed and requires only local interference measurements. The performance of the proposed algorithm is shown through illustrative examples.

Charalambous, Themistoklis

2011-01-01T23:59:59.000Z

152

Energy harvesting and wireless energy transmission for powering SHM sensor nodes  

SciTech Connect

In this paper, we present a feasibility study of using energy harvesting and wireless energy transmission systems to operate SHM sensor nodes. The energy harvesting approach examines the use of kinetic energy harvesters to scavenge energy from the ambient sources. Acceleration measurements were made on a bridge, and serve as the basis for a series of laboratory experiments that replicate these sources using an electromagnetic shaker. We also investigated the use of wireless energy transmission systems to operate SHM sensor nodes. The goal of this investigation is to develop SHM sensing systems which can be permanently embedded in the host structure and do not require on-board power sources. This paper summarizes considerations needed to design such systems, experimental procedures and results, and additional issues that can be used as guidelines for future investigations.

Taylor, Stuart G [Los Alamos National Laboratory; Farinholt, Kevin M [Los Alamos National Laboratory; Park, Gyuhae [Los Alamos National Laboratory; Farrar, Charles R [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

153

Functional requirements for a collaborative platform for power transmission system operators: the case of South Eastern Europe  

Science Conference Proceedings (OSTI)

The economic development and the use of technology have led the developed and developing countries to an increasing demand for electrical power to fuel their activities. To respond in that challenge, transmission system operators should be provided with ... Keywords: distribution management system, electrical market management system, energy management system, supervisory control and data acquisition, transmission grids

P. Krommydakis; P. Karampelas; K. Xilogiannopoulos; L. Ekonomou

2011-04-01T23:59:59.000Z

154

Clock division as a power saving strategy in a system constrained by high transmission frequency and low data rate  

E-Print Network (OSTI)

Systems are often restricted to have higher transmission frequency than required by their data rates. Possible constraints include channel attenuation, power requirements, and backward compatibility. As a result these ...

Selbst, Andrew D. (Andrew David)

2005-01-01T23:59:59.000Z

155

Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or conductors, and two neutral ground wires that would provide both lightning protection and fiber optic communications, on a single set of support structures. The transmission line would originate at TEP's existing South Substation (which TEP would expand), in the vicinity of Sahuarita, Arizona, and interconnect with the Citizens Communications (Citizens) system at a Gateway Substation that TEP would construct west of Nogales, Arizona. The double-circuit transmission line would continue from the Gateway Substation south to cross the U.S.-Mexico border and extend approximately 60 miles (mi) (98 kilometers [km]) into the Sonoran region of Mexico, connecting with the Comision Federal de Electricidad (CFE, the national electric utility of Mexico) at CFE's Santa Ana Substation.

N /A

2003-08-27T23:59:59.000Z

156

Field Guide: Transmission Line Aerial Marking and Lighting  

Science Conference Proceedings (OSTI)

Electric transmission lines and wild birds must co-exist. Power lines traverse birds' flight routes, birds commonly roost on lines and poles, and birds make their nests—the largest of which weigh thousands of pounds—on transmission structures. Some avian activities can have deleterious effects on outdoor structures and transmission—for example, nests have been known to collapse and span critical clearances during storms, resulting in outages. Accordingly, it is important for ...

2013-11-22T23:59:59.000Z

157

Numerical study of electron-leakage power loss in a tri-plate transmission line  

SciTech Connect

Numerical simulations have been conducted using NRL's DIODE2D computer code to model the steady-state behavior of electron flow in a radial diode and in its adjacent tri-plate transmission line (TTL). Particular attention was paid to the magnitude of the electron current flowing from the cathode to the anode surface in the TTL. A quantitative value for this effective power loss is given. The electron current is restricted mainly to the transition region in the TTL into which there is seepage of the B/sub z/ that is imposed in the diode gap. This finding highlights the importance of that region to diode designers.

Barker, R.J.; Goldstein, S.A.

1982-06-23T23:59:59.000Z

158

Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Bulk Electric Power Systems: Bulk Electric Power Systems: Operations and Transmission Planning Volume 4 of 4 Volume 2 PDF Volume 3 PDF Volume 1 PDF Volume 4 PDF NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable Energy Laboratory Baldwin, S. U.S. Department of Energy DeMeo, E. Renewable Energy Consulting Services, Inc. Reilly, J.M. Massachusetts Institute of Technology Mai, T. National Renewable Energy Laboratory Arent, D. Joint Institute for Strategic Energy Analysis Porro, G. National Renewable Energy Laboratory Meshek, M. National Renewable Energy Laboratory Sandor, D. National Renewable

159

Independent transmission system operators and their role in maintaining reliability in a restructured electric power industry  

Science Conference Proceedings (OSTI)

This report summarizes the current status of proposals to form Independent System Operators (ISOs) to operate high-voltage transmission systems in the United States and reviews their potential role in maintaining bulk power system reliability. As background information, the likely new industry structure, nature of deregulated markets, and institutional framework for bulk power system reliability are reviewed. The report identifies issues related to the formation of ISOs and their roles in markets and in reliability, and describes potential policy directions for encouraging the formation of effective ISOs and ensuring bulk system reliability. Two appendices are provided, which address: (1) system operation arrangements in other countries, and (2) summaries of regional U.S. ISO proposals.

NONE

1998-01-01T23:59:59.000Z

160

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Design and cost estimate of an 800 MVA superconducting power transmission  

Science Conference Proceedings (OSTI)

Numerous studies involving cost estimates have been performed for superconducting power transmission systems. As these systems were usually aimed at providing transmission from large clusters of generation the base power rating of the corridor was very high; in the case of the most comprehensive study it was 10,000 MVA. The purpose of this study is to examine a system which is very closely based on the prototype 1000 MVA system which was operated at Brookhaven National Laboratory over a four year period. The purpose of the study is to provide cost estimates for the superconducting system and to compare these estimates with a design based on the use of advanced but conventional cable designs. The work is supported by funding from the Office of Energy Research's Industry/Laboratory Technology Exchange Program. This program is designed to commercialize energy technologies. The technical design of the superconducting system was prepared by the BNL staff, the design of the 800 MVA conventional cable system was done by engineers from Underground Systems Incorporated. Both institutions worked on the cost estimate of the superconducting system. The description and cost estimate of the conventional cable system is given in the Appendix. 5 refs.

Alex, P.; Ernst, A. (Underground Systems, Inc., Armonk, NY (USA)); Forsyth, E.; Gibbs, R.; Thomas, R.; Muller, T. (Brookhaven National Lab., Upton, NY (USA))

1990-10-18T23:59:59.000Z

162

Wholesale Power and Transmission Rate Projections 1993--2014 and Historical Wholesale Power Rates 1939--1992.  

SciTech Connect

This document provides a range of high, medium, and low case long-term projections of Bonneville Power Administration`s (BPA) wholesale power rates and a medium case long-term projection of BPA`s wheeling rates. These projections are produced annually by BPA. BPA uses these projections in long-term marketing, resource, transmission, and financial planning assessments. BPA`s projections also are used by public utility commissions, utilities, and others for a variety of planning purposes. The analysis used for these rate projections assumes that current rate making methodologies continue into the future and are further based on certain assumptions about regional loads, extra-regional markets, the costs of resources, BPA`s financial requirements, and the capability of the region`s power plants. While these projections are intended to address the overall uncertainty in rate levels, BPA realizes that the future will not reflect any specific set of assumptions. The rate projections in this document have been prepared prior to the Draft 1993 BPA Marketing Plan, the implementation of which is almost certain to push BPA away from any set of assumptions in this document. Therefore, this document can be thought of as representing the ``old`` BPA with its products and policies. It can be viewed as a starting point or reference point to measure the impact of the ``new`` BPA with its Marketing Plan, and the broader undertaking referred to as the Competitiveness Project.

US Bonneville Power Administration

1993-11-01T23:59:59.000Z

163

Transmission gates combined with level-restoring CMOS gates reduce glitches in low-power low-frequency multipliers  

Science Conference Proceedings (OSTI)

Various 16-bit multiplier architectures are compared in terms of dissipated energy, propagation delay, energy-delay product (EDP), and area occupation, in view of low-power low-voltage signal processing for low-frequency applications. A novel practical ... Keywords: arithmetic, glitch, low frequency, low power, multiplier, switching activity, transmission gate

Flavio Carbognani; Felix Buergin; Norbert Felber; Hubert Kaeslin; Wolfgang Fichtner

2008-07-01T23:59:59.000Z

164

Cooperation (Transmission  

E-Print Network (OSTI)

Pricing in Wireless Networks Peter Marbach Department of Computer Science University of Toronto #12; Model/Terminology A B #15; Routes are Fixed #15; C r : Capacity of Node r #15; U r (x r ): Utility Function of Node r 6 #12; Model/Terminology #15; x r : Transmission Rate of Node r #15; y r

Marbach, Peter

165

Cost of not splitting in routing: characterization and estimation  

Science Conference Proceedings (OSTI)

This paper studies the performance difference of joint routing and congestion control when either single-path routes or multipath routes are used. Our performance metric is the total utility achieved by jointly optimizing transmission rates using congestion ... Keywords: duality gap, multipath routing, performance gap, single-path routing, sparse representation, utility optimization

Meng Wang; Chee Wei Tan; Weiyu Xu; Ao Tang

2011-12-01T23:59:59.000Z

166

Development of Path 15 Software: Managing Power Transfer Constraints on a Major Transmission Interface: Path 15 of the California Transmission System with EPRI's DTCR Technology  

Science Conference Proceedings (OSTI)

In a previous research project, a dynamic thermal software model was developed and tested for the California Path 15 power transmission interface. A summary of that work is included in this report. The dynamic thermal model used real-time data from tension monitors on the critical Gates Panoche 230-kV lines. It also used continual updates of an automatic load and generation reduction scheme to calculate the post-contingency Path 15 power flow resulting from the loss of two 500-kV lines (double line outag...

2003-12-08T23:59:59.000Z

167

Power Systems Engineering Research Center PSERC Background Paper  

E-Print Network (OSTI)

the laws of physics. Electricity moves from generators through transmission and distribution systems (the much electricity is used, there is little control over where electricity flows through the transmission the shortest route from the generator to the load. Instead, electric power flows through the transmission

168

Overhead electric power transmission line jumpering system for bundles of five or more subconductors  

DOE Patents (OSTI)

Jumpering of electric power transmission lines at a dead end tower. Two transmission line conductor bundles each contain five or more spaced apart subconductors (5) arranged in the shape of a cylinder having a circular cross section. The ends of each bundle of subconductors are attached with insulators to a dead end tower (1). Jumpering allows the electric current to flow between the two bundles of subconductors using jumper buses, internal jumper conductors, and external jumper conductors. One or more current collecting jumper buses (37) are located inside each bundle of subconductors with each jumper bus being attached to the end of a subconductor. Small-diameter internal jumper conductors (33) are located in the inherently electrically shielded area inside each bundle of subconductors with each subconductor (except ones having an attached jumper bus) having one internal jumper conductor connected between that subconductor's end and a jumper bus. Large-diameter external jumper conductors (9) are located outside each bundle of subconductors with one or more external jumper conductors being connected between the jumper buses in one bundle of subconductors and the jumper buses in the other bundle.

Winkelman, Paul F. (Beaverton, OR)

1982-01-01T23:59:59.000Z

169

ANUEADflM-31 Electric Power High-Voltage Transmission Lines:  

Office of Scientific and Technical Information (OSTI)

ANUEADflM-31 ANUEADflM-31 Electric Power High-Voltage Transmission Lines: Design Options, Cost, and Electric and Magnetic Field Levels by J.B. Stoffel,' E.D. Pentecost, R.D. Roman, and P.A. Traczyk Environmental Assessment Division, Argonne National Laboratory, 9700 South Cass Avenue, Argonne, Illinois 60439 November 1994 Work sponsored by United States Department of Energy, Assistant Secretary for Fossil Energy, Office of Fuels Program Stoffel is affiliated with Argonne's Electronics and Computing Technologies Division. D4SlRlBUTlON OF THIS DOCUMENT IS UNLiMltEb - . - . - . - . ... - , . ^ ~ .. , . . . , . . _ I T h i s report i s printed on recycled paper. @ . . .. . ' . . . A :_ - .. ., . . DISCLAIMER This report was .prepared as an account of work sponsored by an agency of the United States Government. Neither

170

Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas  

SciTech Connect

Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

1992-04-01T23:59:59.000Z

171

Microwave and millimeter-wave rectifying circuit arrays and ultra-wideband antennas for wireless power transmission and communications  

E-Print Network (OSTI)

In the future, space solar power transmission and wireless power transmission will play an important role in gathering clean and infinite energy from space. The rectenna, i.e., a rectifying circuit combined with an antenna, is one of the most important components in the wireless power transmission system. To obtain high power and high output voltage, the use of a large rectenna array is necessary. Many novel rectennas and rectenna arrays for microwave and millimeter-wave wireless power transmission have been developed. Unlike the traditional rectifying circuit using a single diode, dual diodes are used to double the DC output voltage with the same circuit layout dimensions. The rectenna components are then combined to form rectenna arrays using different interconnections. The rectennas and the arrays are analyzed by using a linear circuit model. Furthermore, to precisely align the mainbeams of the transmitter and the receiver, a retrodirective array is developed to maintain high efficiency. The retrodirective array is able to track the incident wave and resend the signal to where it came from without any prior known information of the source location. The ultra-wideband radio has become one of the most important communication systems because of demand for high data-rate transmission. Hence, ultra-wideband antennas have received much attention in mobile wireless communications. Planar monopole ultra-wideband antennas for UHF, microwave, and millimeter-wave bands are developed, with many advantages such as simple structure, low cost, light weight, and ease of fabrication. Due to the planar structures, the ultra-wideband antennas can be easily integrated with other circuits. On the other hand, with an ultra-wide bandwidth, source power can be transmitted at different frequencies dependent on power availability. Furthermore, the ultra-wideband antenna can potentially handle wireless power transmission and data communications simultaneously. The technologies developed can also be applied to dual-frequency or the multi-frequency antennas. In this dissertation, many new rectenna arrays, retrodirective rectenna arrays, and ultra-wideband antennas are presented for microwave and millimeter-wave applications. The technologies are not only very useful for wireless power transmission and communication systems, but also they could have many applications in future radar, surveillance, and remote sensing systems.

Ren, Yu-Jiun

2007-05-01T23:59:59.000Z

172

Zonal Rumor Routing for Wireless Sensor Networks  

Science Conference Proceedings (OSTI)

Routing algorithms for wireless sensor networks are constrained by power, memory and computational resources. Rumor Routing algorithm for sensor networks spreads theinformation of an event to other nodes in the network, thus enabling queries to discover ... Keywords: Sensor Network, Routing, Wireless, Rumor Routing

Tarun Banka; Gagan Tandon; Anura P. Jayasumana

2005-04-01T23:59:59.000Z

173

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Statement DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (DOE/EIS-0285) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy Cooperating Agencies: U.S. Forest Service (FS), U.S. Department of Agriculture; Bureau of Land Management (BLM), U.S. Department of Interior Title of Proposed Action: Transmission System Vegetation Management Program States Involved: California, Idaho, Montana, Oregon, Utah, Washington, and Wyoming Abstract: Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation.

174

Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices  

Science Conference Proceedings (OSTI)

Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources.

NONE

1995-11-01T23:59:59.000Z

175

Power and transmission rate orders and related documents. Office of Power Marketing Coordination, data compiled January 1, 1980-December 31, 1981  

Science Conference Proceedings (OSTI)

This publication contains the power and transmission rate orders and related documents issued by the Department of Energy. It covers calendar years 1980 and 1981. The first publication, DOE/CE-007 covering the period from March through December 1979, was published July 1981. This publication is a compilation of all rate orders issued by the Assistant Secretary for Resource Applications and the Assistant Secretary for Conservation and Renewable Energy during calendar years 1980 and 1981 under Delegation Order No. 0204-33. It also includes all final approvals, remands, and disapprovals by the FERC, and a petition to the FERC for reconsideration by a Power Marketing Administration during 1980 and 1981. Also included are two delegation orders along with an amendment and a supplement to one delegation order, a departmental order on financial reporting, and Power and Transmission Rate Adjustment Procedures relating to federal power marketing.

None

1982-08-01T23:59:59.000Z

176

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Purpose, Need and Issues Purpose, Need and Issues S-1 Summary In this summary: ΠPurpose, Need, and Issues ΠMethods and Their Impacts ΠPlanning Steps ΠProgram Alternatives and Their Impacts Purpose, Need and Issues Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 15,000 miles of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure S-1.) Those states offer a great diversity of vegetation (from trees to brush to grasses), which can interfere with electric power flow, pose safety problems for us and neighboring members of the public, or interfere with our ability to maintain our system. We need to keep vegetation a safe distance away from our electric power facilities and control

177

Field Guide: Visual Inspection of Avian Issues on Transmission and Distribution Structures  

Science Conference Proceedings (OSTI)

Electric transmission lines and wild birds must co-exist. Power lines traverse birds' flight routes, birds commonly roost on lines and poles, and birds make their nests—the largest of which weigh thousands of pounds—on transmission structures. Some avian activities can have deleterious effects on outdoor structures and transmission—for example, nests have been known to collapse and span critical clearances during storms, resulting in outages. Accordingly, it is important for ...

2013-11-25T23:59:59.000Z

178

Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement  

SciTech Connect

Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management approach that fosters low-growing plant communities.

N /A

2000-06-23T23:59:59.000Z

179

Bonneville Power Administration Transmission System Vegetation Management Program Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from the electric facilities; (2) increase the program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This DEIS establishes Planning Steps for managing vegetation for specific projects (to be tiered to this EIS). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed: manual, mechanical, herbicide, and biological. Also evaluated are 24 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, they consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would factor a management approach that fosters low-growing plant communities.

N /A

1999-08-20T23:59:59.000Z

180

A Review of the . . . : The Possible Roles of TSOs in Monitoring for Market Power Issues in Congested Transmission Systems  

E-Print Network (OSTI)

The paper surveys the literature and publicly available information on market power monitoring in electricity wholesale markets. After briefly reviewing definitions, strategies and methods of mitigating market power we examine the various methods of detecting market power that have been employed by academics and market monitors/regulators. These techniques include structural and behavioural indices and analysis as well as various simulation approaches. The applications of these tools range from spot market mitigation and congestion management through to long-term market design assessment and merger decisions. Various market-power monitoring units already track market behaviour and produce indices. Our survey shows that these units collect a large amount of data from various market participants and we identify the crucial role of the transmission system operators with their access to dispatch and system information. Easily accessible and comprehensive data supports effective market power monitoring and facilitates market design evaluation. The discretion required for effective market monitoring is facilitated by institutional independence.

Paul Twomey; Richard Green; Karsten Neuhoff; David Newbery

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Number of lightning discharges causing damage to lightning arrester cables for aerial transmission lines in power systems  

SciTech Connect

Damage by lightning discharges to lightning arrester cables for 110-175 kV aerial transmission lines is analyzed using data from power systems on incidents with aerial transmission lines over a ten year operating period (1997-2006). It is found that failures of lightning arrester cables occur when a tensile force acts on a cable heated to the melting point by a lightning current. The lightning currents required to heat a cable to this extent are greater for larger cable cross sections. The probability that a lightning discharge will develop decreases as the amplitude of the lightning current increases, which greatly reduces the number of lightning discharges which damage TK-70 cables compared to TK-50 cables. In order to increase the reliability of lightning arrester cables for 110 kV aerial transmission lines, TK-70 cables should be used in place of TK-50 cables. The number of lightning discharges per year which damage lightning arrester cables is lowered when the density of aerial transmission lines is reduced within the territory of electrical power systems. An approximate relationship between these two parameters is obtained.

Nikiforov, E. P. [Electric Power Scientific Research Institute (VNIIE), branch of OAO 'NTTs Elektroenergetika' (Russian Federation)

2009-07-15T23:59:59.000Z

182

Electric power transmission and distribution systems: costs and their allocation. Research report  

SciTech Connect

Transmission and distribution costs contribute significantly to the total costs of providing electrical service. The costs derived from the transmission and distribution (TandD) system have historically comprised about 2/3 the costs of producing and delivering electricity to residential-commercial customers, and over 1/3 the total costs supplying electricity to large industrial customers. This report: (1) estimates the differences in transmission and distribution equipment required to serve industrial and residential-commercial customers and allocates to the above two customer classes the average costs of installing this equipment; (2) estimates the costs of operation and maintenance of the transmission and distribution system, and allocates these costs to the customer classes; and (3) calculates the TandD derived average costs for the two customer classes. (GRA)

Baughman, M.L.; Bottaro, D.J.

1975-07-01T23:59:59.000Z

183

Minimum Energy Transmission Over a Wireless Channel With Deadline and Power Constraints  

E-Print Network (OSTI)

We consider optimal rate-control for energy-efficient transmission of data, over a time-varying channel, with packet-deadline constraints. Specifically, the problem scenario consists of a wireless transmitter with B units ...

Zafer, Murtaza

184

Microsoft PowerPoint - FY12 RMR - CRSP TRANSMISSION PLANNING MEETING_Final.PPT [Compatibility Mode]  

NLE Websites -- All DOE Office Websites (Extended Search)

TRANSMISSION TRANSMISSION PLANNING MEETING PLANNING MEETING December 6, 2011 December 6, 2011 1 Agenda g Introductions CRSP North (Loveland) Program CRSP South (Phoenix) Program CRSP South (Phoenix) Program Open Forum 2 CRSP North (Loveland) ( ) Capital Program Transmission Lines Substations Communications Communications Control, Protection and Metering M bil & H E i t Mobile & Heavy Equipment Programmatic Improvements 3 Transmission Lines Line Equipment Replacements 50k in FY12 & every year after Pleasant View 24.9-kV Line Replacement Estimated Project Cost (EPC) $ 1,000k FY15 $200K FY16 $800K 4 Substations Annual Equipment Replacement Program Substation Test Equipment Combined all test equipment categories under movable property, "Test Equipment Replacements"

185

Stability effects of frequency controllers and transmission line configurations on power systems with integration of wind power  

E-Print Network (OSTI)

This thesis investigates the stability effects of the integration of wind power on multi-machine power systems. First, the small-signal stability effects of turbine governors connected to synchronous generators in the ...

Abdelhalim, Hussein Mohamed

2012-01-01T23:59:59.000Z

186

MAP 5.50: PJM Service Area in Virginia PJM operates the electric transmission system in Virginia served by Allegheny Power (AP), American  

E-Print Network (OSTI)

(DOM), as shown on MAP 5.50. The transmission system in Virginia delivers power to customers from native generation resources and power transfers across tie-line facilities with the rest of the PJM and other adjoining systems to the west and south. Critical RTEP Issues in Virginia PJM continues to address a number of issues with a bearing on reliability in Virginia and the regional transmission expansion plans required to maintain it: A new 502 Junction-Mt. Storm-Meadowbrook-Loudoun 500kV transmission line is needed to avoid reliability criteria violations in 2011 and maintain power transfers to serve northern

unknown authors

2007-01-01T23:59:59.000Z

187

Record of Decision for the Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements (DOE/EIS-0266) (11/20/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements Administrator's Record of Decision Summary The Bonneville Power Administration (BPA) has decided to execute Transmission Services Agreements (TSAs) and Power Purchase Agreements (PPAs) with Calpine Siskiyou Geothermal Partners, L.P. (Calpine) to acquire output from the Fourmile Hill Geothermal Development Project (Project). Initially, BPA will execute one or more PPAs in order to acquire up to the entire Project output. TSAs will be executed before the Project becomes operational. The United States Forest Service (Forest Service) and the Bureau of Land Management (BLM) were the joint lead Federal agencies in the preparation of

188

A Supply Chain Network Perspective for Electric Power Generation, Supply, Transmission, and Consumption  

E-Print Network (OSTI)

and less costly than older coal-fired power plants. In addition, technological advances in electricity, supply, trans- mission, and consumption is developed. The model is sufficiently general to handle the economics of power production. For example, new gas-fired combined cycle power plants are more effi- cient

Nagurney, Anna

189

Delay-minimal Transmission for Average Power Constrained Multi-access Communications  

E-Print Network (OSTI)

1 P2 P1 Fig. 2. Feasible power region. We note that the state transition matrix P is filled) in the multi- access capacity region. Reference [4] considers the problem of rate/power control in a single. Reference [5] uses dynamic programming to numerically calculate the optimal power/rate control policies

Ulukus, Sennur

190

Assessment Methods and Operating Tools for Grid Reliability: An Executive Report on the Transmission Program of EPRI's Power Deliver y Reliability Initiative  

Science Conference Proceedings (OSTI)

Maintaining a high level of power grid reliability is one of the most pressing issues facing the electric power industry today. This report summarizes the achievements and planned activities of the transmission portion of the industry-wide Power Delivery Reliability Initiative, which is developing new tools and methods for assessing and improving grid reliability.

2001-03-26T23:59:59.000Z

191

Notice of Intent to Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Federal Register / Vol. 63, No. 30 / Friday, February 13, 1998 / Notices taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of his filing are on file with the Commission and are available for public inspection in the Public Reference Room. David P. Boergers, Acting Secretary. [FR Doc. 98-3659 Filed 2-12-98; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Western Area Power Administration Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California AGENCY: Western Area Power Administration, DOE. ACTION: Notice of intent to prepare an Environmental Impact Statement. SUMMARY: In accordance with Section

192

Field Guide: Visual Inspection of Avian Issues on Transmission and Distribution Structures (Hard Copy and Standard PDF)  

Science Conference Proceedings (OSTI)

Electric transmission lines and wild birds must co-exist. Power lines traverse birds' flight routes, birds commonly roost on lines and poles, and birds make their nests—the largest of which weigh thousands of pounds—on transmission structures. Some avian activities can have deleterious effects on outdoor structures and transmission—for example, nests have been known to collapse and span critical clearances during storms, resulting in outages. Accordingly, it is important for ...

2012-11-14T23:59:59.000Z

193

Z .Decision Support Systems 24 1999 297310 A transmission-constrained unit commitment method in power  

E-Print Network (OSTI)

Ã?ersity of California, Berkeley, CA 94720, USA b Pacific Gas Electric Company, San Francisco, CA 94177, USA Abstract. The transmission constraints, as well as the demand and spinning reserve constraints, are relaxed by attaching generating units over a short-term planning horizon subject to the satisfaction of demand and other system

Oren, Shmuel S.

194

A power adjusting algorithm on mobility control in mobile ad hoc networks  

Science Conference Proceedings (OSTI)

Power saving is one of the key issues in mobile ad-hoc networks (MANET), while previous researches in MAC layer are mostly focused on improving the channel utilization by adopting variable-range transmission power control. In this paper we focus on the ... Keywords: dynamic source routing (DSR), mobile ad-hoc networks (MANETs), mobility control, power control, power efficiency

Jianrui Yuan; Jintao Meng

2011-10-01T23:59:59.000Z

195

Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line, June 15, 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 Federal Register / Vol. 64, No. 114 / Tuesday, June 15, 1999 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/ Olinda-Elverta 230-Kilovolt Double- Circuit Transmission Line AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. In response to this request, Western completed an Interconnection Feasibility Study that determined that

196

RECIPIENT:Princeton Power Systems STATE: NJ PROJECT Marine High-Voltage Power Conditioning and Transmission System with Integrated Energy Storage  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Princeton Power Systems Princeton Power Systems STATE: NJ PROJECT Marine High-Voltage Power Conditioning and Transmission System with Integrated Energy Storage TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-0000293 DE-EE0003640 GFO-000364~001 GOO Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, ~terature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

197

Hierarchical Routing over Dynamic Wireless Networks  

E-Print Network (OSTI)

Wireless network topologies change over time and maintaining routes requires frequent updates. Updates are costly in terms of consuming throughput available for data transmission, which is precious in wireless networks. In this paper, we ask whether there exist low-overhead schemes that produce low-stretch routes. This is studied by using the underlying geometric properties of the connectivity graph in wireless networks.

Tschopp, Dominique; Grossglauser, Matthias

2009-01-01T23:59:59.000Z

198

Integrated Control of Active and Reactive Power Flow Controllers to Optimize Transmission System Utilization  

Science Conference Proceedings (OSTI)

Optimized power system control requires oversight of numerous control elements to efficiently and reliably transfer power across the system. The objective of this project was to minimize losses in the Consolidated Edison Electric power system via modification of control variables available to the system operator. These variables include generator voltages, transformer voltage/phase angle tap set points, and switched shunt status. System constraints include bus voltages, branch/interface flow limits, ...

2012-11-08T23:59:59.000Z

199

FirstEnergy Uses EPRI Interregional Reactive Power Management Framework to Help Improve Transmission Voltage Stability  

Science Conference Proceedings (OSTI)

FirstEnergy teamed with EPRI and Powertech Labs to develop a practical, automated method for identifying areas prone to voltage instability due to a lack of reactive power reserves. Power system designers and operational planning engineers can use the new method to evaluate the performance of various power system designs or configurations with regard to susceptibility to voltage instability, determine weak areas requiring special remediation, and maximize the efficient use of assets by determining the mi...

2008-08-19T23:59:59.000Z

200

Space-based solar power generation using a distributed network of satellites and methods for efficient space power transmission  

E-Print Network (OSTI)

Space-based solar power (SSP) generation is being touted as a solution to our ever-increasing energy consumption and dependence on fossil fuels. Satellites in Earth's orbit can capture solar energy through photovoltaic ...

McLinko, Ryan M.

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Electric power high-voltage transmission lines: Design options, cost, and electric and magnetic field levels  

SciTech Connect

This report provides background information about (1) the electric and magnetic fields (EMFs) of high-voltage transmission lines at typical voltages and line configurations and (2) typical transmission line costs to assist on alternatives in environmental documents. EMF strengths at 0 {+-} 200 ft from centerline were calculated for ac overhead lines, and for 345 and 230-kV ac underground line and for a {+-}450-kV dc overhead line. Compacting and height sensitivity factors were computed for the variation in EMFs when line conductors are moved closer or raised. Estimated costs for the lines are presented and discussed so that the impact of using alternative strategies for reducing EMF strengths and the implications of implementing the strategies can be better appreciated.

Stoffel, J.B.; Pentecost, E.D.; Roman, R.D.; Traczyk, P.A.

1994-11-01T23:59:59.000Z

202

Design and analysis of transmission-level power system stability control.  

E-Print Network (OSTI)

??After the August 14, 2003 blackout, power system stability probelm has received a great deal of attention. This project is focused on the analysis of… (more)

Phan, Tu

2007-01-01T23:59:59.000Z

203

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement - Appendices Statement - Appendices DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement DOE/EIS-0285 APPENDICES May 2000 Table of Contents Appendix A - Public Involvement: Publications Appendix B - Biological Weed Control Agents Appendix C - Bonneville Pesticide Applicator Certification Plan Appendix D - Sample Educational Information Appendix E - Clearance Criteria Appendix F - FS Mitigation Measures and Background Appendix G - BLM Mitigation Measures and Background Appendix H - Herbicide Fact Sheets 2,4-D Azafenidin Bromacil Chlorsulfuron Clopyralid Dicamba Dichlobenil Diuron Fosamine Ammonium Glyphosate Halosulfuron-methyl Hexazinone Imazapyr Isoxaben Mefluidide Metsulfuron-methyl

204

Decentralized optimal neuro-controllers for generation and transmission devices in an electric power network  

Science Conference Proceedings (OSTI)

In this paper, the dual heuristic programming (DHP) optimization algorithm is applied for the design of two LOCAL nonlinear optimal neuro-controllers on a practical multi-machine power system. One neuro-controller is designed to replace the conventional ... Keywords: Decentralized control, Dual heuristic programming, Optimal neuro-controller, Power network, Series capacitive reactance compensator

Jung-Wook Park; Ronald G. Harley; Ganesh K. Venayagamoorthy

2005-02-01T23:59:59.000Z

205

LineScout technology: from inspection to robotic maintenance on live transmission power lines  

Science Conference Proceedings (OSTI)

Power line inspection and maintenance practices are evolving as changing market regulations, significantly increased line loading and system availability requirements put pressure on grid owners to innovate. Robotics is thus making its debut in that ... Keywords: field robotics, mechanical design, power line inspection robot, telerobotics

Nicolas Pouliot; Serge Montambault

2009-05-01T23:59:59.000Z

206

Numerical investigation of the physical model of a high-power electromagnetic wave in a magnetically insulated transmission line  

SciTech Connect

An efficient numerical code for simulating the propagation of a high-power electromagnetic pulse in a vacuum transmission line is required to study the physical phenomena occurring in such a line, to analyze the operation of present-day megavolt generators at an {approx}10-TW power level, and to design such new devices. The main physical theoretical principles are presented, and the stability of flows in the near-threshold region at the boundary of the regime of magnetic self-insulation is investigated based on one-dimensional telegraph equations with electron losses. Numerical (difference) methods-specifically, a method of characteristics and a finite-difference scheme-are described and their properties and effectiveness are compared by analyzing the high-frequency modes.

Samokhin, A. A. [Troitsk Institute for Innovation and Fusion Research (Russian Federation)

2010-02-15T23:59:59.000Z

207

Tests with a line-commutated converter as a variable inductive load on the Bonneville Power Administration transmission system  

DOE Green Energy (OSTI)

A twelve-pulse, line-commutated converter, with a steady-state rating of 2.5 kV and 5.5 kA, formerly used for charging and discharging a superconducting magnet, was reconfigured as a static reactive power load. Tests staged at the Tacoma, WA, substation of the Bonneville Power Administration (BPA) revealed that the converter could be used as a variable inductive load, provided a stable current controller was installed. The unit was modulated as a variable VAR load following a sinusoidal VAR demand signal with an amplitude up to 14.8 MVAR. The total losses at maximum VAR output were 370 kW. This paper explains the necessary modifications of the converter to operate as a variable reactive load. Measured current waveshapes are analyzed. The effects of such a load on the BPA transmission system are presented.

Boenig, H.J.; Hauer, J.F.; Nielsen, R.G.

1986-01-01T23:59:59.000Z

208

Routing Policy System Replication  

Science Conference Proceedings (OSTI)

The RIPE database specifications and RPSL define languages used as the basis for representing information in a routing policy system. A repository for routing policy system information is known as a routing registry. A routing registry provides a means ...

C. Villamizar; C. Alaettinoglu; R. Govindan; D. Meyer

2000-02-01T23:59:59.000Z

209

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

210

Tri-State Generation and Transmission Association's Springverville unit 3 earns POWER's highest honor  

Science Conference Proceedings (OSTI)

It is said that pioneers take the arrows. In the case of Springerville Unit 3 - a 418 MW(net) expansion of a Tucson Electric Power facility in Arizona and the first pulverized coal-fired units built in the US in more than decade, the arrows were many. Although Tri-State (the developer), Tuscon Electric (the host), and Bechtel Power (the EPC contractor) were wounded by delayed deliveries of major equipment, bankruptcy of a major supplier, and a labor shortage, the companies showed their pioneering spirit and completed the project ahead of schedule. For ushering in a new generation of clean and desperately needed baseload capacity, Springerville Unit 3 is POWER magazine's 2006 Plant of the Year. 9 figs.

Peltier, R.

2006-09-15T23:59:59.000Z

211

Capital cost models for geothermal power plants and fluid transmission systems. [GEOCOST  

SciTech Connect

The GEOCOST computer program is a simulation model for evaluating the economics of developing geothermal resources. The model was found to be both an accurate predictor of geothermal power production facility costs and a valid designer of such facilities. GEOCOST first designs a facility using thermodynamic optimization routines and then estimates costs for the selected design using cost models. Costs generated in this manner appear to correspond closely with detailed cost estimates made by industry planning groups. Through the use of this model, geothermal power production costs can be rapidly and accurately estimated for many alternative sites making the evaluation process much simpler yet more meaningful.

Schulte, S.C.

1977-09-01T23:59:59.000Z

212

Use of a Geographic Mapping Tool in Power Line Routing for RF Hazard Identification: A Feasibility Evaluation  

Science Conference Proceedings (OSTI)

Radiofrequency (RF) fields induce currents and voltages on conductive objects with the general finding that larger or longer or taller objects, such as power lines and tall cranes, can result in greater currents and voltages. Medium wave frequencies (MF) associated with operation of AM radio broadcast stations are particularly prone to induction of RF voltages on long and/or tall cables that present the potential for arcing to ground or personnel who may initiate contact with the conductor. MF includes t...

2011-11-16T23:59:59.000Z

213

Complex Dynamics of Blackouts in Power Transmission Systems B. A. Carreras and V. E. Lynch  

E-Print Network (OSTI)

53706 USA D. E. Newman Physics Dept., University of Alaska, Fairbanks, AK 99775 USA Abstract A model has demand, the engineering response to system failures, and the upgrade of generator capacity. Two types growth of the country and to continuously increasing power demand. The evolution and reliability

214

Thermal Sciences The thermal sciences area involves the study of energy conversion and transmission, power  

E-Print Network (OSTI)

, power generation, the flow of liquids and gases, and the transfer of thermal energy (heat) by means, Thermodynamics, a sophomore spring course. This is followed by ME 608, Fluid Dynamics in the fall of the junior - Analytical Fluid Dynamics ME 709 - Computational Fluids Dynamics ME 712 - Waves in Fluids #12;

Chini, Gregory P.

215

Power Quality for Transmission and Distribution: Harmonics Design and Analytics Guidebook  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has published numerous guidebooks, reports, and technical briefs on subjects pertaining to harmonics. Overall, the full EPRI library of documents on harmonics is highly comprehensive and spans the entire range of subject matter, from the effects of harmonic voltages and currents on customer and utility equipment to methodologies useful in conducting harmonic studies. Although this large selection of harmonics-related documents exists, the individual documents ...

2011-11-30T23:59:59.000Z

216

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

differences: models for transmission property rights,” IEEEto solve power transmission network design problems,” IEEES. A. "Network topologies and transmission investment under

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

217

Abstract--This paper proposes an optimization based method of planning reactive power control for electric transmission  

E-Print Network (OSTI)

for electric transmission systems to endow them with the capability of being reconfigured to a secure of the electric transmission system. There are three basic options for strengthening transmission systems: (1-term planning to strengthen transmission capability is necessary to increase future reliability levels

Kumar, Ratnesh

218

Energy-Efficient Cooperative Routing in BER Constrained Multihop Networks  

E-Print Network (OSTI)

Abstract — Due to the limited energy supplies of nodes, in many applications like wireless sensor networks energy-efficiency is crucial for extending the lifetime of these networks. We study the routing problem for multihop wireless ad hoc networks based on cooperative transmission. The source node wants to transmit messages to a single destination. Other nodes in the network may operate as relay nodes. In this paper, we propose a cooperative multihop routing for the purpose of power savings, constrained on a required bit error rate (BER) at the destination. We derive analytical results for line and grid network topologies. It is shown that energy savings of 100 % are achievable in line and grid networks with a large number of nodes for BER =10 ?4 constraint at the destination. I.

Behrouz Maham; Mérouane Debbah; Are Hjørungnes

2010-01-01T23:59:59.000Z

219

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

220

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final EIS Appendix A: Revised Mitigation Measures Final EIS Appendix A: Revised Mitigation Measures August 2002 Page A-1 Appendix A Revised Mitigation Measures The proposed project includes measures that would limit construction and operation impacts to elements of the natural and human environment. These measures are presented for each element of the environment identified as a potential concern by Bonneville and EFSEC based on preliminary environmental review and public and regulatory agency input. Updates to the mitigation table below are in response to comments on the Draft EIS or to incorporate new information included in the Settlement Agreements. Mitigation Measure Power Plant Pipelines Bonneville T-Line EARTH Seismicity Facilities would be designed to meet regional seismic design criteria as presented in the Uniform Building Code (UBC). X X

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Image transmission over OFDM channel with rate allocation scheme and minimum peak-toaverage power ratio  

E-Print Network (OSTI)

This paper proposes new scheme for efficient rate allocation in conjunction with reducing peak-to-average power ratio (PAPR) in orthogonal frequency-division multiplexing (OFDM) systems. Modification of the set partitioning in hierarchical trees (SPIHT) image coder is proposed to generate four different groups of bit-stream relative to its significances. The significant bits, the sign bits, the set bits and the refinement bits are transmitted in four different groups. The proposed method for reducing the PAPR utilizes twice the unequal error protection (UEP), using the Read-Solomon codes (RS), in conjunction with bit-rate allocation and selective interleaving to provide minimum PAPR. The output bit-stream from the source code (SPIHT) will be started by the most significant types of bits (first group of bits). The optimal unequal error protection (UEP) of the four groups is proposed based on the channel destortion. The proposed structure provides significant improvement in bit error rate (BER) performance. Per...

Mohammed, Usama S

2010-01-01T23:59:59.000Z

222

High-power microwave LDMOS transistors for wireless data transmission technologies (Review)  

Science Conference Proceedings (OSTI)

The fields of the application, structure, fabrication, and packaging technology of high-power microwave LDMOS transistors and the main advantages of these devices were analyzed. Basic physical parameters and some technology factors were matched for optimum device operation. Solid-state microwave electronics has been actively developed for the last 10-15 years. Simultaneously with improvement of old devices, new devices and structures are actively being adopted and developed and new semiconductor materials are being commercialized. Microwave LDMOS technology is in demand in such fields as avionics, civil and military radars, repeaters, base stations of cellular communication systems, television and broadcasting transmitters, and transceivers for high-speed wireless computer networks (promising Wi-Fi and Wi-Max standards).

Kuznetsov, E. V., E-mail: E.Kouzntsov@tcen.ru; Shemyakin, A. V. [Moscow Institute of Electronic Technology, SMC Technological Center (Russian Federation)

2010-12-15T23:59:59.000Z

223

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

224

Single and three-phase AC losses in HTS superconducting power transmission line prototype cables  

SciTech Connect

AC losses in two, one-meter-long lengths of HTS prototype multi-strand conductors (PMC`s) are measured with a temperature-difference calorimeter. Both single-phase and three-phase losses are examined with ac currents up to 1,000 A rms. The calorimeter, designed specifically for these measurements, has a precision of 1 mW. PMC {number_sign}1 has two helically-wound, non-insulated layers of HTS tape (19 tapes per layer), each layer wrapped with opposite pitch. PMC {number_sign}2 is identical except for insulation between the layers. The measured ac losses show no significant effect of interlayer insulation and depend on about the third power of the current--a result in agreement with the Bean-Norris model adapted to the double-helix configuration. The three-phase losses are a factor of two higher than those exhibited by a single isolated conductor, indicating a significant interaction between phases.

Daney, D.E.; Boenig, H.J.; Maley, M.P.; Coulter, J.Y. [Los Alamos National Lab., NM (United States); Fleshler, S. [American Superconductor, Inc., Westborough, MA (United States)

1997-11-01T23:59:59.000Z

225

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

226

1394 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 4, NOVEMBER 2007 Economic Criteria for Planning Transmission  

E-Print Network (OSTI)

for Planning Transmission Investment in Restructured Electricity Markets Enzo E. Sauma, Member, IEEE. In reality, however, since the impacts of an electricity transmission project on different players may vary that should be considered when planning electricity transmission investments. We propose an electricity

Oren, Shmuel S.

227

Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses  

Science Conference Proceedings (OSTI)

Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments.

NONE

1995-11-01T23:59:59.000Z

228

EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah  

Energy.gov (U.S. Department of Energy (DOE))

This EIS is being prepared jointly by DOE’s Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western’s proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska.

229

Whirlpool routing for mobility  

Science Conference Proceedings (OSTI)

We present the Whirlpool Routing Protocol (WARP), which efficiently routes data to a node moving within a static mesh. The key insight in WARP's design is that data traffic can use an existing routing gradient to efficiently probe the topology, repair ... Keywords: collection protocol, mobile routing, sensor network

Jung Woo Lee; Branislav Kusy; Tahir Azim; Basem Shihada; Philip Levis

2010-09-01T23:59:59.000Z

230

Routing Discussion Paper  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ROUTING ISSUES RELATED TO ROUTING ISSUES RELATED TO U.S. DEPARTMENT OF ENERGY RADIOACTIVE MATERIALS TRANSPORTATION: DISCUSSION AND RECOMMENDATIONS PREPARED BY THE ROUTING TOPIC GROUP OF THE TRANSPORTATION EXTERNAL COORDINATION WORKING GROUP APRIL 1998 (a) Routing Issues Related to U.S. Department of Energy Radioactive Materials Transportation: Discussion and Recommendations Table of Contents I. Introduction ........................................................................................................................................ 1 II. Assumptions for Planning Purposes..................................................................................................... 1 III. The Current Routing Regulatory Structure and Its Implications...........................................................

231

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

232

EPRI-GTC Overhead Electric Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

This report explains and documents a standardized process that utilities could use to improve the way transmission line routes are evaluated and selected.

2006-02-06T23:59:59.000Z

233

Network Routing Capacity  

E-Print Network (OSTI)

We define the routing capacity of a network to be the supremum of all possible fractional message throughputs achievable by routing. We prove that the routing capacity of every network is achievable and rational, we present an algorithm for its computation, and we prove that every non-negative rational number is the routing capacity of some network. We also determine the routing capacity for various example networks. Finally, we discuss the extension of routing capacity to fractional coding solutions and show that the coding capacity of a network is independent of the alphabet used.

Jillian Cannons; Randall Dougherty; Christopher Freiling; Kenneth Zeger

2005-01-01T23:59:59.000Z

234

Solar-aware Routing in Wireless Sensor Networks  

E-Print Network (OSTI)

Solar-aware Routing in Wireless Sensor Networks Thiemo Voigt, Hartmut Ritter and Jochen Schiller energy sources such as solar power may provide unlimited energy resources to a changing subset these nodes is appealing. In this paper, we present solar-aware routing, a rout- ing protocol for wireless

235

Power efficiency of wavelength-routed optical NoC topologies for global connectivity of 3D multi-core processors  

Science Conference Proceedings (OSTI)

There is still a significant gap between the optical network-on-chip (NoC) concept and a mature interconnect technology with practical relevance. Current research aims at bridging this gap by evolving basic optical components and by developing ad-hoc ... Keywords: optical networks-on-chip, wavelength-routed optical nocs

Luca Ramini; Davide Bertozzi

2012-12-01T23:59:59.000Z

236

Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.  

DOE Green Energy (OSTI)

This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.

Eyer, James M. (Distributed Utility Associates, Livermore, CA); Butler, Paul Charles; Iannucci, Joseph J., Jr. (,.Distributed Utility Associates, Livermore, CA)

2005-11-01T23:59:59.000Z

237

Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska  

SciTech Connect

This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

1991-06-01T23:59:59.000Z

238

Power Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Operations Outage Coordination Standards of Conduct Transmission Planning You are here: SN Home page > Power Operations Power Operations Western's Sierra Nevada Region...

239

VOLUME 46 JOURNAL OF APPLIED METEOROLOGY AND CLIMATOLOGY NOVEMBER 2007 Supplying Baseload Power and Reducing Transmission Requirements by Interconnecting Wind Farms  

E-Print Network (OSTI)

Wind is the world’s fastest growing electric energy source. Because it is intermittent, though, wind is not used to supply baseload electric power today. Interconnecting wind farms through the transmission grid is a simple and effective way of reducing deliverable wind power swings caused by wind intermittency. As more farms are interconnected in an array, wind speed correlation among sites decreases and so does the probability that all sites experience the same wind regime at the same time. The array consequently behaves more and more similarly to a single farm with steady wind speed and thus steady deliverable wind power. In this study, benefits of interconnecting wind farms were evaluated for 19 sites, located in the midwestern United States, with annual average wind speeds at 80 m above ground, the hub height of modern wind turbines, greater than 6.9 m s ?1 (class 3 or greater). It was found that an average of 33 % and a maximum of 47 % of yearly averaged wind power from interconnected farms can be used as reliable, baseload electric power. Equally significant, interconnecting multiple wind farms to a common point and then connecting that point to a far-away city can allow the long-distance portion of transmission capacity to be reduced, for example, by 20 % with only a 1.6 % loss of energy. Although most parameters, such as intermittency, improved less than linearly as the number of interconnected sites increased, no saturation of the benefits

Cristina L. Archer; Mark; Z. Jacobson

2006-01-01T23:59:59.000Z

240

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Nonlinear magnetoinductive transmission lines  

E-Print Network (OSTI)

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent cap...

Lazarides, Nikos; Tsironis, G P

2011-01-01T23:59:59.000Z

242

Power Electronics for Distributed Energy Systems and Transmission and Distribution Applications: Assessing the Technical Needs for Utility Applications  

DOE Green Energy (OSTI)

Power electronics can provide utilities the ability to more effectively deliver power to their customers while providing increased reliability to the bulk power system. In general, power electronics is the process of using semiconductor switching devices to control and convert electrical power flow from one form to another to meet a specific need. These conversion techniques have revolutionized modern life by streamlining manufacturing processes, increasing product efficiencies, and increasing the quality of life by enhancing many modern conveniences such as computers, and they can help to improve the delivery of reliable power from utilities. This report summarizes the technical challenges associated with utilizing power electronics devices across the entire spectrum from applications to manufacturing and materials development, and it provides recommendations for research and development (R&D) needs for power electronics systems in which the U.S. Department of Energy (DOE) could make a substantial impact toward improving the reliability of the bulk power system.

Tolbert, L.M.

2005-12-21T23:59:59.000Z

243

Microsoft Word - CX-Alvey-Fairview_VerizonFiberRouting_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2011 9, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Shelley Fenton Realty Specialist - TERR-3 Proposed Action: Granting Verizon Wireless permission to route approximately 2900 feet of fiber across fee-owned land from McVay Highway to their existing equipment pad located at Bonneville Power Administration's (BPA) tower 1/5 on the Alvey-Fairview transmission line. PP&A Project No.: 2013 Budget Information: N/A Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.7 Burying fiber optic cable. Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. Location: Section 14; Township 18S; Range 3W - Willamette Meridian in Lane County,

244

Rail Routing Criteria Selection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

File name 1 File name 1 Rail Routing: Using Decision Analysis to Evaluate Objectives Ruth F. Weiner, Sandia National Laboratories Steven Hamp, U. S. Department of Energy April 22, 2004 Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. TEC1 File name 2 Scoping the Problem * More than one rail route is available between any spent fuel site in the U. S. and Caliente, NV. * Routes differ in several parameters, like route length, track quality, urban areas transited, and so on. * Any particular route may not uniformly have more desirable parameters than another route; e.g. a shorter route may go through more urban centers.

245

The Development of HVDC Transmission System  

Science Conference Proceedings (OSTI)

The ever increasing process of high-voltage high-power fully controlled semiconductor technology has promoted the flexible ac transmission systems ahead significantly. Developments advance both the HVDC power transmission and the flexible ac transmission ... Keywords: converters station, HVDC transmission systems, power electronics

Yang Zhou; Dao Zhuojiang; Yu Fenwang

2012-07-01T23:59:59.000Z

246

Electricity Transmission Data Needs Focus Group Results  

U.S. Energy Information Administration (EIA)

power, transmission flows within states, the implications of transmission on capacity expansion decisions and costs; age of transformers and other facilities;

247

NREL: Transmission Grid Integration - Eastern Renewable Generation...  

NLE Websites -- All DOE Office Websites (Extended Search)

transmission? How does geographic diversity of wind reduce wind integration costs? How do offshore and onshore wind power compare? What transmission is needed to facilitate higher...

248

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

249

A review of the monitoring of market power : the possible roles of TSOs in monitoring for market power issues in congested transmission systems  

E-Print Network (OSTI)

The paper surveys the literature and publicly available information on market power monitoring in electricity wholesale markets. After briefly reviewing definitions, strategies and methods of mitigating market power we ...

Twomey, Paul

2005-01-01T23:59:59.000Z

250

Message-driven based energy-efficient routing in heterogeneous delay-tolerant networks  

Science Conference Proceedings (OSTI)

Delay-Tolerant Network (DTN) nodes are mostly energy-limited devices that run on battery power. DTN routing strategies on such resource-constrained nodes therefore need to be energy efficient. Contemporary routing protocols such as Two-Hop Routing (2HR) ... Keywords: dtn, energy efficiency, heterogeneity, performance modeling, routing

V. K. Chaithanya Manam; V. Mahendran; C. Siva Ram Murthy

2012-10-01T23:59:59.000Z

251

Western Area Power Administration, Desert Southwest Region Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm  

NLE Websites -- All DOE Office Websites (Extended Search)

Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Replacements at Structure 0/7 - Continuation Sheet Special Conditions Biological Resources 1. To avoid impacts to nesting birds, project activities will be scheduled between August 1 and February 15, as feasible. Crews shall not cause injury or death to nesting birds, active nests, eggs, or nestlings. If evidence of a nesting bird is found in the project area, crews shall immediately stop work in that area until Western's Environmental Group has been contacted. 2. A qualified biologist will be present during all project activities and serve as the project's Biological Monitor. The Biological Monitor will be authorized by Western to temporarily halt construction activity if needed to prevent harm to desert tortoise. The Biological Monitor's

252

A Study On High Voltage AC Power Transmission Line Electric And Magnetic Field Coupling With Nearby Metallic Pipelines.  

E-Print Network (OSTI)

??In the recent years, there has been a trend to run metallic pipelines carrying petroleum products and high voltage AC power lines parallel to each… (more)

Gupta, Abhishek

2006-01-01T23:59:59.000Z

253

Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.  

SciTech Connect

This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.

Eyer, James M. (Distributed Utility Associates, Livermore, CA); Butler, Paul Charles; Iannucci, Joseph J., Jr. (,.Distributed Utility Associates, Livermore, CA)

2005-11-01T23:59:59.000Z

254

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

case study of U.S. transmission line siting,” Energy Policy,Dual variable on transmission line k’s power flownetwork branches (transmission lines), it is possible to

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

255

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

256

Automated manual transmission controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

257

SunShot Initiative: Transmission Grid Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Grid Integration to Transmission Grid Integration to someone by E-mail Share SunShot Initiative: Transmission Grid Integration on Facebook Tweet about SunShot Initiative: Transmission Grid Integration on Twitter Bookmark SunShot Initiative: Transmission Grid Integration on Google Bookmark SunShot Initiative: Transmission Grid Integration on Delicious Rank SunShot Initiative: Transmission Grid Integration on Digg Find More places to share SunShot Initiative: Transmission Grid Integration on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards

258

Notice of Intent for the Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota (5/27/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 16 Federal Register / Vol. 70, No. 102 / Friday, May 27, 2005 / Notices Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Note that also there is an ''eSubscription'' link on the web site that enables subscribers to receive e- mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659. Comment Date: June 9, 2005. Magalie R. Salas, Secretary. [FR Doc. E5-2702 Filed 5-26-05; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Western Area Power Administration Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota

259

Theory of intense radio waves in an underdense ionosphere: application to solar power satellite transmissions. Final report  

DOE Green Energy (OSTI)

The instabilities in the F-region plasma are investigated that can be created by the passage of a solar power satellite beam (2.45 Ghz frequency, at a power flux of 23 mW/cm/sup 2/) at frequencies much higher than the cut-off plasma frequency of the ionosphere. The threshold geometry and frequency and intensity scaling laws are calculated for the thermal self-focusing instability, and its saturation level is estimated. The possibility is considered of scaled experiments at HF power to detect the thermal self-focusing instability for an underdense ionosphere. Other experimental possibilities are discussed in terms of the scaling laws. (LEW)

Goldman, M.V.

1980-11-01T23:59:59.000Z

260

Information transmission through lossy bosonic memory channels  

E-Print Network (OSTI)

We study the information transmission through a quantum channel, defined over a continuous alphabet and losing its energy en route, in presence of correlated noise among different channel uses. We then show that entangled inputs improve the rate of transmission of such a channel.

Giovanna Ruggeri; Giulio Soliani; Vittorio Giovannetti; Stefano Mancini

2005-02-15T23:59:59.000Z

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

McNary-John Day Transmission Line Project Record of Decision (DOE/EIs-0332), (11/08/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Record of Decision Decision The Bonneville Power Administration (Bonneville) has decided to construct the proposed McNary-John Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. Bonneville has decided to implement the proposed action identified in the McNary-John Day Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0332, August 2002). The proposed action consists of building 79 miles of 500-kilovolt (kV) transmission line between Bonneville's McNary Substation and John Day Substation. As part of the proposed action, Bonneville has also decided to construct certain short-line routing alternatives identified in the Final EIS. These alternatives are the

262

An ant swarm-inspired energy-aware routing protocol for wireless ad-hoc networks  

Science Conference Proceedings (OSTI)

Primitive routing protocols for ad-hoc networks are ''power hungry'' and can therefore consume considerable amount of the limited amount of battery power resident in the nodes. Thus, routing in ad-hoc networks is very much energy-constrained. Continuous ... Keywords: Ad-hoc networks, Ant colony optimization, Energy-efficiency, Performance evaluation, Routing, Simulation

Sudip Misra; Sanjay K. Dhurandher; Mohammad S. Obaidat; Pushkar Gupta; Karan Verma; Prayag Narula

2010-11-01T23:59:59.000Z

263

A Review of the Monitoring of Market Power The Possible Roles of TSOs in Monitoring for Market Power Issues in Congested Transmission Systems  

E-Print Network (OSTI)

independence. JEL: D43, L13, L51, L94 Keywords: Electricity, liberalisation, market power, regulation 1 We would like to thank Michael Metcalf for helpful comments. Financial support from the Association...

Twomey, Paul; Green, Richard J; Neuhoff, Karsten; Newbery, David

2006-03-14T23:59:59.000Z

264

Routing Technique Based on Clustering for Data Duplication Prevention in Wireless Sensor Network  

E-Print Network (OSTI)

Wireless Sensor Networks is important to nodes energy consumption for long activity of sensor nodes because nodes that compose sensor network are small size, and battery capacity is limited. For energy consumption decrease of sensor nodes, sensor networks routing technique is divided by flat routing and hierarchical routing technique. Specially, hierarchical routing technique is energy efficient routing protocol to pare down energy consumption of whole sensor nodes and to scatter energy consumption of sensor nodes by forming cluster and communicating with cluster head. but though hierarchical routing technique based on clustering is advantage more than flat routing technique, this is not used for reason that is not realistic. The reason that is not realistic is because hierarchical routing technique does not consider data transmission radius of sensor node in actually. so this paper propose realistic routing technique base on clustering.

Kim, Boseung; Shin, Yongtae

2009-01-01T23:59:59.000Z

265

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

266

Transmission SEAB Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

267

DOE Transmission Capacity Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

268

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

conventional power and wind power make transmission more300 MW or more of new wind power and focus on the deeperthe trend toward wind power’s inclusion in regional

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

269

Laboratory Shuttle Bus Routes: Blue Route  

NLE Websites -- All DOE Office Websites (Extended Search)

Blue Route Map (On-Site/Off-Site) Blue Route Map (On-Site/Off-Site) Scroll down or click here for schedule ↓ Printable Map Blue Route map Blue Route Schedule Effective May 3, 2013 Text Box: BLUE SHUTTLE SCHEDULE BLUE Route # 65 DOWNHILL BART 65 UPHILL 62/66 1 6:20 AM 6:30 AM 6:40 AM 6:52 AM 2 6:30 AM 6:40 AM 6:50 AM 7:02 AM 3 6:40 AM 6:50 AM 7:00 AM 7:12 AM 4 6:50 AM 7:00 AM 7:10 AM 7:22 AM 1 7:04 AM 7:16 AM 7:28 AM 7:40 AM 2 7:16 AM 7:28 AM 7:40 AM 7:52 AM 3 7:28 AM 7:40 AM 7:52 AM 8:04 AM 4 7:40 AM 7:52 AM 8:04 AM 8:16 AM 1 7:52 AM 8:04 AM 8:16 AM 8:28 AM 2 8:04 AM 8:16 AM 8:28 AM 8:40 AM 3 8:16 AM 8:28 AM 8:40 AM 8:52 AM 4 8:28 AM 8:40 AM 8:52 AM 9:04 AM 1 8:40 AM 8:52 AM 9:04 AM 9:16 AM 2 8:52 AM 9:04 AM 9:16 AM 9:28 AM 3 9:04 AM 9:16 AM 9:28 AM 9:40 AM 4 9:16 AM 9:28 AM 9:40 AM 9:52 AM 1 9:28 AM 9:40 AM 9:52 AM 10:04 AM 2 9:40 AM 9:52 AM 10:04 AM 10:16 AM 3 9:52 AM 10:04 AM

270

Modeling Routing Overhead Generated by Wireless Reactive Routing Protocols  

E-Print Network (OSTI)

In this paper, we have modeled the routing over- head generated by three reactive routing protocols; Ad-hoc On-demand Distance Vector (AODV), Dynamic Source Routing (DSR) and DYnamic MANET On-deman (DYMO). Routing performed by reactive protocols consists of two phases; route discovery and route maintenance. Total cost paid by a protocol for efficient routing is sum of the cost paid in the form of energy consumed and time spent. These protocols majorly focus on the optimization performed by expanding ring search algorithm to control the flooding generated by the mechanism of blind flooding. So, we have modeled the energy consumed and time spent per packet both for route discovery and route maintenance. The proposed framework is evaluated in NS-2 to compare performance of the chosen routing protocols.

Javaid, Nadeem; Javaid, Akmal; Malik, Shahzad A

2011-01-01T23:59:59.000Z

271

Energy Efficient Routing in Ad Hoc Disaster Recovery Networks  

E-Print Network (OSTI)

disaster site, the Wireless Emergency Response Team (WERT) attempted to locate survivors through signalsEnergy Efficient Routing in Ad Hoc Disaster Recovery Networks Gil Zussman and Adrian Segall. Keywords: Routing, Energy efficient, Energy conserving, Power aware, Disaster recovery networks, Ad hoc

Zussman, Gil

272

Cluster based dynamic routing on powerline carrier network  

Science Conference Proceedings (OSTI)

Topology of power line carrier network (PLCN) is complex, fast changeable and its channel is time-variant. To enhance the availability and effectiveness of network communication, a cluster based dynamic routing algorithm (CBDR) is proposed in the paper. ... Keywords: cluster algorithm, dynamic route, powerline carrier network, tree-topology

Hong Li; Wang Kensheng; Li Shurong; Zou Weixia; Zhou Zheng

2009-09-01T23:59:59.000Z

273

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

274

Post-processing of polymer foam tissue scaffolds with high power ultrasound: a route to increased pore interconnectivity, pore size and fluid transport  

E-Print Network (OSTI)

We expose thick polymer foam tissue scaffolds to high power ultrasound and study its effect on the openness of the pore architecture and fluid transport through the scaffold. Our analysis is supported by measurements of fluid uptake during insonification and imaging of the scaffold microstructure via x-ray computed tomography, scanning electron microscopy and acoustic microscopy. The ultrasonic treatment is found to increase the mean pore size by over 10%. More striking is the improvement in fluid uptake: for scaffolds with only 40% water uptake via standard immersion techniques, we can routinely achieve full saturation of the scaffold over approximately one hour of exposure. These desirable modifications occur with no loss of scaffold integrity and negligible mass loss, and are optimized when the ultrasound treatment is coupled to a pre-wetting stage with ethanol. Our findings suggest that high power ultrasound is a highly targetted and efficient means to promote pore interconnectivity and fluid transport in...

Watson, N J; Reinwald, Y; White, L J; Ghaemmaghami, A M; Morgan, S P; Rose, F R A J; Povey, M J W; Parker, N G

2013-01-01T23:59:59.000Z

275

Post-processing of polymer foam tissue scaffolds with high power ultrasound: a route to increased pore interconnectivity, pore size and fluid transport  

E-Print Network (OSTI)

We expose thick polymer foam tissue scaffolds to high power ultrasound and study its effect on the openness of the pore architecture and fluid transport through the scaffold. Our analysis is supported by measurements of fluid uptake during insonification and imaging of the scaffold microstructure via x-ray computed tomography, scanning electron microscopy and acoustic microscopy. The ultrasonic treatment is found to increase the mean pore size by over 10%. More striking is the improvement in fluid uptake: for scaffolds with only 40% water uptake via standard immersion techniques, we can routinely achieve full saturation of the scaffold over approximately one hour of exposure. These desirable modifications occur with no loss of scaffold integrity and negligible mass loss, and are optimized when the ultrasound treatment is coupled to a pre-wetting stage with ethanol. Our findings suggest that high power ultrasound is a highly targetted and efficient means to promote pore interconnectivity and fluid transport in thick foam tissue scaffolds.

N J Watson; R K Johal; Y Reinwald; L J White; A M Ghaemmaghami; S P Morgan; F R A J Rose; M J W Povey; N G Parker

2013-02-18T23:59:59.000Z

276

Hydromechanical transmission  

DOE Patents (OSTI)

A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

Orshansky, Jr. deceased, Elias (LATE OF San Francisco, CA); Weseloh, William E. (San Diego, CA)

1978-01-01T23:59:59.000Z

277

Mutual Design Considerations for Overhead AC Transmission Lines and Gas Transmission Pipelines, Volume 1: Engineering Analysis  

Science Conference Proceedings (OSTI)

This reference book presents data on an investigation into the mutual effects of electric power transmission lines and natural gas transmission pipelines sharing rights-of-way. Information is useful to both power and pipeline industry users.

1978-09-01T23:59:59.000Z

278

Aerosol Route Synthesis of Copper Oxide Nanoparticles Using ...  

Science Conference Proceedings (OSTI)

Presentation Title, Aerosol Route Synthesis of Copper Oxide Nanoparticles Using Copper Nitrate Solution ... Phase Transformation Hardening by Using High -Power Direct Diode Laser ... Defect Energetics and Fission Product Transport in ZrC.

279

Author manuscript, published in "ChinaCom2008, Chine (2008)" Energy-Efficient Cooperative Routing in BER Constrained Multihop Networks  

E-Print Network (OSTI)

Abstract — Due to the limited energy supplies of nodes, in many applications like wireless sensor networks energy-efficiency is crucial for extending the lifetime of these networks. We study the routing problem for multihop wireless ad hoc networks based on cooperative transmission. The source node wants to transmit messages to a single destination. Other nodes in the network may operate as relay nodes. In this paper, we propose a cooperative multihop routing for the purpose of power savings, constrained on a required bit error rate (BER) at the destination. We derive analytical results for line network topology. It is shown that energy savings of 100 % are achievable in line networks with a large number of nodes for BER = 10 ?4 constraint at the destination. I.

Behrouz Maham; Mérouane Debbah; Are Hjørungnes

2009-01-01T23:59:59.000Z

280

NREL: Transmission Grid Integration - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

282

Route guidance information for elderly passengers: route naming methods  

E-Print Network (OSTI)

The effect of bus route names on elderly transit riders' route-finding performance was investigated. A survey of public transit companies indicated that most identify routes with names and numbers, plus color coding, and that most route names correspond to the streets on which the routes travel or to the route's destinations. A survey of college undergraduate students indicated a preference for route names that included "North", "South", "East", or "West" to indicate the area of the city in which a route travels. The maps and timetables from the Vancouver, Washington bus system were used to test trip-planning performance; this system was selected because (1) its map and timetable package met many of the criteria in previous literature for ease of use and (2) Vancouver is an unfamiliar city to most residents of Bryan-College Station, Texas, where this study was conducted. Two versions of the materials were prepared; "North", "South", etc. were added to the bus route names in one version of the materials. Thirty-two Bryan-College Station residents, aged 55 years and older, were each given one version of the route guidance materials and asked to plan three trips on the bus using those materials. No significant difference in trip-planning accuracy or speed was realized between the two groups of test participants. Very few participants used route names to select the routes they needed, relying instead on route numbers and colors. On the questionnaire which followed the trip-planning exercise, participants ranked route names as the least helpful route-finding tool, below color coding and route numbers. Problems encountered by participants during the trip-planning process and their comments and suggestions indicate that color coding, map detail and the addition of map use examples and/or instructions may be important issues for future investigation.

Higgins, Laura Lynne

1993-01-01T23:59:59.000Z

283

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Idaho, the state's siting authority is limited to siting approvals on state property, and high voltage transmission lines (115kV or greater) within a National Interstate Electric Transmission Corridor (NIETC). Under these circumstances a Route Permit would be required by the Idaho Public Utilities Commission (IPUC); however, no such corridors have been designated and therefore the process has not been tested. Local governments

284

Steady state modelling and analysis of flexible AC transmission systems.  

E-Print Network (OSTI)

??As electric utilities move into more competitive generation supply regimes, with limited scope to expand transmission facilities, the optimisation of existing transmission corridors for power… (more)

Fuerte Esquivel, Claudio Rubén

1997-01-01T23:59:59.000Z

285

PP-369 British Columbia Transmission Corporation and British...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority PP-369 British Columbia Transmission Corporation and British Columbia Hydro and...

286

Comments of New England Electric Transmission Corporation on Proposed Open  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New England Electric Transmission Corporation on New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Motion to intervene out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and New England Power Company. Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities FE Docket No 99-1 (PP-76/EA-76) More Documents & Publications Ontario Power Generation Motion to Intervene & Comments in FE Docket No.

287

On False Data Injection Attacks against Distributed Energy Routing in Smart Grid  

Science Conference Proceedings (OSTI)

Smart Grid is a new type of energy-based cyber physical system (CPS) that will provide reliable, secure, and efficient energy transmission and distribution. The way to secure the distributed energy routing process that efficiently utilizes the distributed ... Keywords: Smart grid, Distributed energy routing, False data injection attacks, Energy distribution

Jie Lin; Wei Yu; Xinyu Yang; Guobin Xu; Wei Zhao

2012-04-01T23:59:59.000Z

288

Transmission planning in China  

Science Conference Proceedings (OSTI)

Though China is well along in restructuring its power markets, it still has some way to travel before economic considerations receive adequate weight in transmission planning decisions. Adoption of more sophisticated tools such as multi-agent modeling will help China continue in its progress in achieving this. (author)

Dong, Jun; Zhang, Jing

2009-07-15T23:59:59.000Z

289

A Co-optimization Routing Algorithm in Wireless Sensor Network  

Science Conference Proceedings (OSTI)

The MACORA is presented to solve the collision between mobile agent and multicast suppression in channel competitive process. With two-layer graph model, the channel converter problem in the dual-channel wireless sensor networks can be simplified into ... Keywords: Co-optimization, Dual-channel, Mobile agent, Packet transmission, The optimal route Restoring, Wireless sensor networks

Ran Jin, Chunhai Kou, Ruijuan Liu, Yefeng Li

2013-06-01T23:59:59.000Z

290

QoS Routing in Smart Grid  

E-Print Network (OSTI)

Smart grid is an emerging technology which is able to control the power load via price signaling. The communication between the power supplier and power customers is a key issue in smart grid. Performance degradation like delay or outage may cause significant impact on the stability of the pricing based control and thus the reward of smart grid. Therefore, a QoS mechanism is proposed for the communication system in smart grid, which incorporates the derivation of QoS requirement and applies QoS routing in the communication network. For deriving the QoS requirement, the dynamics of power load and the load-price mapping are studied. The corresponding impacts of different QoS metrics like delay are analyzed. Then, the QoS is derived via an optimization problem that maximizes the total revenue. Based on the derived QoS requirement, a simple greedy QoS routing algorithm is proposed for the requirement of high speed routing in smart grid. It is also proven that the proposed greedy algorithm is a $K$-approximation. ...

Li, Husheng

2010-01-01T23:59:59.000Z

291

Kentucky Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

EPRI, in conjunction with Georgia Transmission Corporation (GTC) and Photo Science, Inc. (PSI), developed a standardized methodology for siting overhead electric transmission lines. EPRI report 1013080, EPRI-GTC Overhead Electric Transmission Line Siting Methodology, published February 2006, provides additional information. This methodology has been applied in Georgia and currently is being applied to projects in Kentucky by East Kentucky Power Cooperative and E.ON U.S. on behalf of Louisville Gas and El...

2007-12-18T23:59:59.000Z

292

Duke Energy's Transmission Roadmap Initiative  

Science Conference Proceedings (OSTI)

Duke Energy's Transmission Roadmap Initiative advances a vision for development of a power delivery communications and automation infrastructure. The initiative describes performance of a communications upgrade to substations, implementation of select technologies and applications, and integration of enterprise applications, databases, and systems. This report provides a comprehensive view of Duke's Transmission Roadmap Initiative, with a complete technology assessment, infrastructure overview, and discu...

2009-09-18T23:59:59.000Z

293

Transportation Routing Analysis Geographic Information System (TRAGIS)  

E-Print Network (OSTI)

Transportation Routing Analysis Geographic Information System (TRAGIS) Model and Network Databases The Transportation Routing Analysis Geographic Information System (TRAGIS) model is a geographic information system tool for modeling transportation routing. TRAGIS offers numerous options for route calculation

294

Transmission Developers Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

295

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

296

National Electric Transmission Congestion Studies  

Energy.gov (U.S. Department of Energy (DOE))

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission...

297

Bulk Power System Dynamics and Control -VI, August 22-27, 2004, Cortina d'Ampezzo, Italy Transmission Investment in Competitive Electricity Markets  

E-Print Network (OSTI)

Transmission Investment in Competitive Electricity Markets Javier Contreras George Gross E.T.S. de Ingenieros of the transmission network were in the hands of a single central entity. However, the unbundling of the electricity Industriales Department of Electrical and Computer Engineering Universidad de Castilla ­ La Mancha University

Gross, George

298

Soil Thermal Properties Manual for Underground Power Transmission: Soil Thermal Property Measurements, Soil Thermal Stability, and the Use of Corrective Thermal Backfills  

Science Conference Proceedings (OSTI)

The thermal properties of soil used to bury underground transmission cables -- often only crudely estimated in the past -- can have a large impact on the capacity of a transmission system. This guide provides comprehensive information on soil thermal property measurement, surveying, interpretation, and improvement.

1997-12-02T23:59:59.000Z

299

The role of transmission investment in the coordination between generation and transmission  

E-Print Network (OSTI)

generation and transmission of electricity into distinct modules. The governance structure of transmission the governance of electricity transmission assets influences the implementation of power flow management. Finally to coordinate generation and transmission of electricity is in real organizations. 1 Assistant Professors

Paris-Sud XI, Université de

300

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Automated manual transmission clutch controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

1999-11-30T23:59:59.000Z

302

Routing algorithms for large scale wireless sensor networks  

E-Print Network (OSTI)

Routing in sensor networks is a challenging issue due to inherent constraints such as power, memory, and CPU processing capabilities. In this thesis, we assume an All to All communication mode in an N × N grid sensor network. We explore routing algorithms which load balance the network without compromising the shortest paths constrain. We analyzed the Servetto method and studied two routing strategies, namely Horizontal-Vertical routing and Zigzag routing. The problem is divided into two scenarios, one being the static case (without failed nodes), and the other being the dynamic case (with failed nodes). In static network case, we derived mathematical formulae representing the maximum and minimum loads on a sensor grid, when specific routing strategies are employed. We show improvement in performance in load balancing of the grid by using Horizontal-Vertical method instead of the existing Servetto method. In the dynamic network scenario, we compare the performance of routing strategies with respect to probability of failure of nodes in the grid network. We derived the formulae for the success-ratio, in specific strategies, when nodes fail with a probability of p in a predefined source-destination pair communication. We show that the Servetto method does not perform well in both scenarios. In addition, Hybrid strategy proposed does not perform well compared to the studied strategies. We support the derived formulae and the performance of the routing strategies with extensive simulations.

Nittala Venkata, Lakshmana Prasanth

2004-12-01T23:59:59.000Z

303

A Guide for Transmission Line Voltage Upgrade  

Science Conference Proceedings (OSTI)

In the last few decades, construction of new transmission facilities has not caught up with the demand for electric power. The problem of transmission capacity shortage was further compounded by deregulation of the power industry, which allows power to be dispatched from any generation source for the lowest energy cost. As a result, lines that were not planned for these power flows may now be overloaded. A number of bottlenecks were thus created, restricting power transfer from one location to another. U...

2008-12-09T23:59:59.000Z

304

NREL: Transmission Grid Integration - Solar Integration National...  

NLE Websites -- All DOE Office Websites (Extended Search)

of the Western Wind and Solar Integration Study and Eastern Wind Integration and Transmission Study datasets greatly advanced the modeling of wind and solar power production...

305

Coordination of Federal Authorizations for Electric Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy...

306

DOE Transmission System Integration Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

307

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

308

Western Area Power Administration, Desert Southwest Region  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration, Desert Southwest Region Liberty-Parker #2 230-kV Transmission Line Optical Power Ground Wire Repairs - Continuation Sheet Project Description The scope of work includes digging a trenching and burying a 1.25-inch OPGW conduit. The conduit trench will be about 4 feet deep and 10 inches wide, with warning tape placed above the conduit in the trench. Once the conduit has been placed, the trench will be backfilled with the original surface material. About 5.3 linear miles of trenching will be required, mostly within the existing dirt access road associated with the LIB-PAD #2 transmission line. Four pullboxes will be installed along the route. The pullboxes measure 2 feet by 3 feet by 2 feet and will be installed at least 24 inches below grade. An

309

Western Area Power Administration, Desert Southwest Region  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 Western Area Power Administration, Desert Southwest Region Liberty-Parker #2 230-kV Transmission Line Optical Power Ground Wire Repairs - Continuation Sheet Project Description The scope of work includes digging a trenching and burying a 1.25-inch OPGW conduit. The conduit trench will be about 4 feet deep and 10 inches wide, with warning tape placed above the conduit in the trench. Once the conduit has been placed, the trench will be backfilled with the original surface material. About 5.3 linear miles of trenching will be required, mostly within the existing dirt access road associated with the LIB-PAD #2 transmission line. Four pullboxes will be installed along the route. The pullboxes measure 2 feet by 3 feet by 2 feet and will be installed at least 24 inches below grade. An

310

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

at: http://www.ftloutreach.com Xcel Energy, TransmissionCBED CapX Utilities Midwest Xcel Energy Voluntary UtilityElectric Transmission Study Xcel-31A Southwest Power Pool (

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

311

Selfish Routing in Capacitated Networks  

E-Print Network (OSTI)

According to Wardrop's first principle, agents in a congested network choose their routes selfishly, a behavior that is captured by the Nash equilibrium of the underlying ...

Correa, Jose R.

2003-08-01T23:59:59.000Z

312

A Smarter Transmission Grid  

Science Conference Proceedings (OSTI)

Our modern transmission grid transports bulk power over long distances and across many provincial boundaries, but ever-increasing energy demands are significantly transforming it. Worldwide, many catalysts are driving this transformation, including emerging supply- and demand-side technologies, cyber security concerns, and aging infrastructures, to name just a few. As the grid transforms and more grid-connected renewable resources complicate reliability, it will be increasingly difficult to meet its futu...

2010-12-31T23:59:59.000Z

313

Transportation Center Seminar........ "Proactive Transmission Planning in  

E-Print Network (OSTI)

Transportation Center Seminar........ "Proactive Transmission Planning in Electricity Networks of the biggest problems of actual power-systems transmission planning is its reactive nature. We formulate-systems transmission planning, generation investment, and market operation decisions and propose a methodology to solve

Bustamante, Fabián E.

314

A scalable wireless routing protocol secure against route truncation attacks  

Science Conference Proceedings (OSTI)

Wireless routing protocols allow transmitting nodes to have some knowledge of the topology in order to decide when to forward a packet (via broadcast) and when to drop it. Since a routing protocol forms the backbone of any network, it is a lucrative ...

Amitabh Saxena; Ben Soh

2010-05-01T23:59:59.000Z

315

Routing Protocols to Maximize Battery Efficiency  

E-Print Network (OSTI)

In this paper we propose a routing protocol for wireless ad hoc networks whose nodes are largely battery powered. The battery capacity of the nodes is viewed as a common resource of the system and its use is to be optimized. Results from a previous study on battery management have shown that: (1) pulsed current discharge outperforms constant current discharge, (2) battery capacity can be improved by using a bursty discharge pattern due to charge recovery effects that take place during idle periods, (3) given a certain value of current drawn off the battery, higher current impulses degrade battery performance, even if the percentage of higher current impulses is relatively small. We develop a network protocol based on these findings. This protocol favors routes whose links have a low energy cost. We also distribute multihop traffic in a manner that allows all nodes a good chance to recover their battery energy reserve.

Carla F. Chiasserini; Ramesh R. Rao

2000-01-01T23:59:59.000Z

316

Regional Transmission Projects: Finding Solutions  

Science Conference Proceedings (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

317

Laboratory Shuttle Bus Routes  

NLE Websites -- All DOE Office Websites (Extended Search)

Rear bike rack image Rear bike rack image The Laboratory provides shuttle bus services, contracted through MV Transportation Services. Routes run throughout its 200-acre facility, downtown Berkeley, local off-site facilities, UC Campus, Downtown Berkeley BART, and Rockridge BART stations. Shuttles offer free wifi onboard. Riders are asked to adhere to riding instructions. Active shuttle stops are marked with this sign: Bus sign image Shuttles run Monday through Friday, except Laboratory holidays. There is no weekend service. Special service for tours, group travel, etc. is available for a fee. All shuttles are equipped with Nextbus which uses GPS technology to enable riders to obtain real-time information on bus arrivals. Contact Bus Services at busservices@lbl.gov or 510-486-4165 to provide

318

Node-Capacitated Ring Routing  

Science Conference Proceedings (OSTI)

We consider the node-capacitated routing problem in an undirected ring network along with its fractional relaxation, the node-capacitated multicommodity flow problem. For the feasibility problem, Farkas' lemma provides a characterization for general ... Keywords: half-integral flow, multicommodity flow, ring routing

AndrÁs Frank; Bruce Shepherd; Vivek Tandon; Zoltán Végh

2002-05-01T23:59:59.000Z

319

Technical Architecture for Transmission Operations and Protection  

Science Conference Proceedings (OSTI)

Transmission systems are a critical power transport backbone and are increasingly necessary for integration of new and more diverse power generation from a variety of sources. In some areas, customers are generating their own power through renewable sources and may have surpluses that get "pushed back" into the power grid. This situation will be further exacerbated with plug-in hybrid vehicles, large wind farms, photovoltaic arrays, and other sources as energy continues to dominate the economy. Transmiss...

2008-12-23T23:59:59.000Z

320

Alternative Transmission Technologies for Joint Planning Studies  

Science Conference Proceedings (OSTI)

This report describes a detailed analysis of joint transmission planning needs and capabilities, including an assessment of current research in the area. The report has value as a starting point and reference for transmission planners engaged in joint planning exercises because it focuses on technologies that could facilitate joint transmission planning of a bulk power grid. A joint planning exercise involves the collaboration of multiple transmission planning groups that may each have ...

2013-12-09T23:59:59.000Z

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Autonomous routing algorithms for networks with wide-spread failures : a case for differential backlog routing  

E-Print Network (OSTI)

We study the performance of a differential backlog routing algorithm in a network with random failures. Differential Backlog routing is a novel routing algorithm where packets are routed through multiple paths to their ...

Khan, Wajahat Faheem

2008-01-01T23:59:59.000Z

322

Electrical Effects of HVDC Transmission Lines  

Science Conference Proceedings (OSTI)

High-voltage direct current (HVDC) transmission lines are used to transmit large amounts of power over long distances. The Electric Power Research Institute (EPRI) and others have produced many publications over approximately the past three decades, expounding on this topic. Several HVDC transmission lines have been built and have been in operation around the world over that period, and recently, there has been increased interest in the advantages that HVDC transmission affords. HVDC lines, like high-vol...

2010-12-23T23:59:59.000Z

323

Notice of Intent to Prepare an Environmental Impact Statement for the proposed Griffith Power Plant and Transmission Line Project, Mojave County, AZ  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

96 96 Federal Register / Vol. 63, No. 64 / Friday, April 3, 1998 / Notices Metered Entities the ISO and Alta Power Generation, L.L.C., for acceptance by the Commission. The ISO states that this filing has been served on all parties listed on the official service list in Docket Nos. EC96- 19-003 and ER96-1663-003, including the California Public Service Commission. Comment date: April 9, 1998, in accordance with Standard Paragraph E at the end of this notice. 16. Allegheny Power Service Corp., on Behalf of Monongahela Power The Potomac Edison Company, and West Penn Power Company (Allegheny Power) [Docket No. ER98-2307-000] Take notice that on March 24, 1998, Allegheny Power Service Corporation on behalf of Monongahela Power Company, The Potomac Edison Company and West Penn Power

324

Airspace: Antarctic Sound Transmission  

E-Print Network (OSTI)

Antarctic Sound Transmission Andrea Polli Director,investigates how sound transmission can contribute to thePoles. How have such transmission-based projects developed

Polli, Andrea

2009-01-01T23:59:59.000Z

325

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

326

Hawaii International Conference on System Sciences, January 3-6, 2001, Maui, Hawaii. 2001 IEEE Modeling Blackout Dynamics in Power Transmission Networks  

E-Print Network (OSTI)

dynamics of cascading overloads and outages. The model dynamics are demonstrated on the simple power system to the time series of historical data for North American power grid blackouts. The sandpile was not a model from the historical data for North American power grid blackouts. Here we describe the implementation

327

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Estimates of Congestion Costs. The Electricity Journal 17,Incremental Transmission Costs Due to Wind Power. Rockville,and Intermittency Really Cost? Supply Curves for Electricity

Mills, Andrew D.

2009-01-01T23:59:59.000Z

328

Transmission Valuation and Cost Recovery  

Science Conference Proceedings (OSTI)

This technical update provides information on the status of the electric power industry regarding the economic valuation of transmission projects. Such valuations became critical with the introduction of economic transmission projects in the context of competitive electricity markets. Economic valuation is also becoming increasingly important for traditional reliability upgrades, because of the need for consistency in cost allocations between the two types of upgrades. The year 2005 has brought significa...

2005-12-22T23:59:59.000Z

329

NEPA Review Routing Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

South Composting Facility South Composting Facility Document Number: 300 Date of Routing: 12/01/2010 (after MJT review 11/30/2010) Name Reviewed Signature Forwarded To Forwarded Date /"'. Date Anne Theriault 12/01/2010 ~A~ """'S" VL'f Steve Ames 12/01/201 0 Steve Ames 12/01/2010 '-~~~J.A.Pt ~..vi Email MJT 12/01/2010 Steve Ames 12/01/2010 <::)f.~ a 1...,.. D .-s~ Jeff Christiansen 12/01 /2010 . / / / / Jeff Christiansen 12/01/2010 4H /""-. :.-- Mike Taylor 12/01 /2010 ,,, /?1. y L (J ,:2_ 12./:L/11? Nf"f..b5 W~J2k: ~f€\J£' 14rf11'5 JZ.. /z./to 'S r ,.:-. j ~-- .A .ItA ~ s I Z / ,£ / 11 fiA t K t.. T .A" I Ur I l / 1.../JC J /41('~ /2. !2../.e.. I It? P?2'. / / <;7/?;.,L::_

330

NEPA Review Routing Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Concrete Storage Yard Concrete Storage Yard Document Number: 301 Date of Routing: 12/01/2010 (after MJT review 11/30/2010) Name Reviewed Signature Forwarded To Forwarded Date Date Anne Theriault 12/01/2010 ~ ..... --1 .L - Steve Ames 12/01/2010 Steve Ames 12/01/2010 :"#-~- /2--........, Email MJT 12/01/2010 Steve Ames 12/01/2010 s.£~ ~~ Jeff Christiansen 12/01/2010 ~ / / Jeff Christiansen 12/01/2010 /7~ A"' A'"~ Mike Taylor 12/01/2010 ~~"'' 1-4'1''-..t:P~ JZ-/2.//C> AJ El'l>S t..Ji!) ~K tf7TIJ c ,t/rtf f ~ !:z..Lz_L/.o , r S·rP:IIE At11Ef' .~ { L/lt:- ~.a A\ lt"L"' 1A'l1Al I 1-- I 'f../ /0 _.., _, ---r79 '(_L47 /2--. 12-/.L I IP ~L"/Y~A sn:vc 19"1r5 12-/2//P

331

NEPA Review Routing Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

North Composting Facility North Composting Facility Document Number: 299 Date of Routing: 12/01/2010 (after MJT review 11/30/2010) Name Reviewed Signature Forwarded To Forwarded Date ..... Date Anne Theriault 12/01/2010 tl-i.A 1 ../\ _/ ~ Steve Ames 12/01/2010 Steve Ames 12/01/2010 t.::}wtLA Email MJT 12/01/2010 Steve Ames 12/01/2010 .LZ..L.-1 Jeff Christiansen 12/01/2010 . ~ "/ / / Jeff Christiansen 12/01/2010 ,(J,U y n--(/' Mike Taylor 12/01/2010 '~"' --r7j I{ LLtJ I? JZ../2../!b Nr_4l./)5 w&ll. K .S T£ v C AIV\ cs 12../2.../ I 0 ( .e:.,~:,/t.; AM IF s I t-fi. /,,s (J.,..,.M ·/A,_r_, 7AYtoJ- IZ....(z../lq ~ .... / --r-?JY~e t<.j .z..j / e:> I#'~ y ../"'~--< 5Tt: \J C /1 J111 C 5 t<-./z_j/0

332

Transportation Routing Analysis Geographic Information System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transportation Routing Analysis Geographic Information System (TRAGIS) to Spent Fuel Routing Analysis P. E. Johnson R.R. Rawl Oak Ridge National Laboratory TRAGIS is being used by...

333

Optimization Online - The Freight Train Routing Problem  

E-Print Network (OSTI)

Jul 21, 2013 ... Abstract: We consider the following freight train routing problem (FTRP). Given is a transportation network with fixed routes for passenger trains ...

334

Proposed amendment for Presidential Permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada Northern States Power Company. Final Environmental Assessment  

SciTech Connect

Northern States Power Company, (NSP), a Minnesota investor owned utility has applied to the Office of Fossil Energy, United States Department of Energy, to amend Presidential Permit PP-63 to allow for alterations to the 500 kV transmission line and as sedated facilities currently regulated by this permit. The alterations proposed for the 500 kV line owned by NSP are part of a long term effort sponsored by NSP to upgrade the existing NSP transmission system to allow for increased exchange of electricity with the Manitoba Hydro-Electric Board. Presidential Permit PP-63 authorized NSP to construct, connect, operate and maintain a 500 kV line at the United States/Canadian border approximately seven-and-a-half miles west of Warroad in Roseau County, Minnesota. This line connects with a 500 kV line owned and operated by the Manitoba Hydro-Electric Board (MHEB), which extends from Dorsey, Manitoba, Canada to the United States/Canadian border. NSP proposes to increase the electricity transfer capability of this transmission facility by constructing a new 80-acre substation on the existing 500 kV line in Roseau County, Minnesota, and upgrading the existing substation at Forbes, Minnesota. The proposed Roseau substation would contain two 41.5 ohm series capacitor banks. In addition, static VAR compensators are to be installed at the existing Forbes Substation. Approximately 5 acres would be added to the 30-acre Forbes site to house the additional equipment. No new lines would enter or exit the facility. NSP proposes to place the new Roseau Substation in service in May 1993 and to complete the upgrading of the Forbes Substation in March 1994. The primary, initial purpose of these modifications is to enable NSP to import 400 megawatts of electric power from MHEB during the summer months to meet peak electrical demand in the Minneapolis-St. Paul area. It is expected that this power transfer would begin in 1993.

Not Available

1992-02-01T23:59:59.000Z

335

Selfish routing with side constraints  

E-Print Network (OSTI)

seminal work of Roughgarden and Tardos [6] on the price of anarchy for selfish routing. Their model ... pay more than a certain amount for gas or tolls. So far ...

336

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

337

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

338

NREL: Transmission Grid Integration - Research Staff  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Staff Research Staff NREL's transmission grid integration research staff work to incorporate renewable energy into the transmission system primarily through NREL's Power Systems Engineering Center. Photo of Barbara O'Neill Barbara O'Neill, Transmission and Grid Integration Group Manager M.S., Energy Management and Policy, University of Pennsylvania Engineering Diploma, Petroleum Economics and Management, French Institute of Petroleum B.S., Electrical Engineering, Pratt Institute Barbara has a diverse background with expertise in such fields as wind and solar project development, energy forecasting, renewable energy power purchase agreements, interconnection issues, market structures, and stakeholder engagement. Barbara currently manages the Transmission and Grid

339

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

340

Identification of Severe Multiple Contingencies in Electric Power Networks  

E-Print Network (OSTI)

we identify a few transmission lines in a large power systemphase angles ? . When transmission lines are removed fromthat afternoon, just three transmission lines that underwent

Donde, Vaibhav; Lopez, Vanessa; Lesieutre, Bernard; Pinar, Ali; Yang, Chao; Meza, Juan

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Energy Efficient Routing in Ad Hoc Disaster Recovery Networks  

E-Print Network (OSTI)

, during the rescue attempts in the World Trade Center disaster site, the Wireless Emergency Response TeamEnergy Efficient Routing in Ad Hoc Disaster Recovery Networks Gil Zussman and Adrian Segall, energy conserving, power aware, disaster recovery networks, ad hoc networks, smart badges, IEEE 802.15 1

Zussman, Gil

342

Maximizing Battery Life Routing in Wireless Ad Hoc Networks  

E-Print Network (OSTI)

Maximizing Battery Life Routing in Wireless Ad Hoc Networks Weifa Liang Department of Computer Abstract--Most wireless ad hoc networks consist of mobile devices which operate on batteries. Power con, for an ad hoc network consisting of the same type of battery mobile nodes, two approximation algorithms

Liang, Weifa

343

Survey A survey of routing protocols for smart grid communications  

Science Conference Proceedings (OSTI)

With the recent initiatives to upgrade the existing power grid to the Smart Grid (SG), there has been a significant interest in the design and development of an efficient communications infrastructure for connecting different components of the SG. In ... Keywords: HANs, NANs, Routing, Smart grid, Smart grid communications network, WANs

Nico Saputro; Kemal Akkaya; Suleyman Uludag

2012-07-01T23:59:59.000Z

344

Energy-Efficient Networking Energy-Aware Routing Protocol  

E-Print Network (OSTI)

from to a physical server in another DC, when, the second DC has access to the renewable energy sourcesEnergy-Efficient Networking Energy-Aware Routing Protocol Minimum Power Topology Energy-Aware Admission Control Management of Resources in the Liquid Network Summary Energy Efficient Protocols in Self

Tobagi, Fouad

345

Routing in sparse splitting optical networks with multicast traffic  

Science Conference Proceedings (OSTI)

In this paper, we investigate the problem of Multicast Routing in Sparse Splitting Networks (MR-SSN). Given a network topology with the multicast capable nodes distributed uniformly throughout the network, and a multicast session, the MR-SSN problem ... Keywords: Steiner tree, Tabu search, light splitting, multicast, power issues

Shuguang Yan; Jitender S. Deogun; Maher Ali

2003-01-01T23:59:59.000Z

346

Optimal Routing and Scheduling in Multihop Wireless Renewable Energy Networks  

E-Print Network (OSTI)

Optimal Routing and Scheduling in Multihop Wireless Renewable Energy Networks MHR. Khouzani-constrained wireless ad-hoc networks where nodes are powered by renewable energy sources. We take into account the fact that renewable energy harvesting processes are unpredictable and stochastic in nature ­ typically depending

Sarkar, Saswati

347

Customized BGP Route Selection Using BGP/MPLS VPNs  

E-Print Network (OSTI)

Customized route selection mechanisms at ASBR Use Virtual Routing and Forwarding (VRF) instances to build

Bonaventure, Olivier

348

Modeling complexity of enterprise routing design  

Science Conference Proceedings (OSTI)

Enterprise networks often have complex routing designs given the need to meet a wide set of resiliency, security and routing policies. In this paper, we take the position that minimizing design complexity must be an explicit objective of routing design. ... Keywords: network complexity, routing design, top-down modeling

Xin Sun; Sanjay G. Rao; Geoffrey G. Xie

2012-12-01T23:59:59.000Z

349

2009 Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Electric Transmission Congestion Study 9 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

350

DOE EAC Electricity Adequacy Report. Transmission Section - September 15,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Section - Transmission Section - September 15, 2008 DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 There is a critical need to upgrade the nation's electric transmission grid. Two reasons in particular drive this need. First, increasing transmission capability will help ensure a reliable electric supply and provide greater access to economically-priced power. Second, with the growth in state-adopted renewable performance standards (RPS) and the increasing possibility of a national RPS, significant new transmission, much of it interregional, is needed to access renewable resources. DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 More Documents & Publications DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT-

351

2009 Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

352

PP-369 British Columbia Transmission Corporation and British Columbia Hydro  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PP-369 British Columbia Transmission Corporation and British PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Presidential Permit authorizing British Columbia Transmission Corporation and British Columbia Hydro and Power Authority to construct, operate,a dn maintain electric transmission facilities at the U.S. - Canada Border. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority More Documents & Publications PP-369 British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application to Amend Presidential Permit OE Docket No. PP-022-4 British

353

Geothermal/Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Transmission < Geothermal Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Leasing Exploration Well Field Power Plant Transmission Environment Water Use Print PDF Geothermal Transmission General Regulatory Roadmap NEPA (5) The Geysers power plant showing condensers being retrofitted with direct contact condensers (DCCs). The DCCs were designed by NREL researchers working with Calpine Corporation for improved efficiency. With a 750-megawatt output from 14 units, the Geysers is the largest producer of geothermal power in the world. Geothermal power plants are located very close to the geothermal resource because the hot water/steam would cool down before reaching the power plant, unlike a natural gas plant which pipe gas hundreds or even thousands

354

The Consistent Vehicle Routing Problem  

SciTech Connect

In the small package shipping industry (as in other industries), companies try to differentiate themselves by providing high levels of customer service. This can be accomplished in several ways, including online tracking of packages, ensuring on-time delivery, and offering residential pickups. Some companies want their drivers to develop relationships with customers on a route and have the same drivers visit the same customers at roughly the same time on each day that the customers need service. These service requirements, together with traditional constraints on vehicle capacity and route length, define a variant of the classical capacitated vehicle routing problem, which we call the consistent VRP (ConVRP). In this paper, we formulate the problem as a mixed-integer program and develop an algorithm to solve the ConVRP that is based on the record-to-record travel algorithm. We compare the performance of our algorithm to the optimal mixed-integer program solutions for a set of small problems and then apply our algorithm to five simulated data sets with 1,000 customers and a real-world data set with more than 3,700 customers. We provide a technique for generating ConVRP benchmark problems from vehicle routing problem instances given in the literature and provide our solutions to these instances. The solutions produced by our algorithm on all problems do a very good job of meeting customer service objectives with routes that have a low total travel time.

Groer, Christopher S [ORNL; Golden, Bruce [University of Maryland; Edward, Wasil [American University

2009-01-01T23:59:59.000Z

355

Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WORKSHOP WORKSHOP DOUBLETREE CRYSTAL CITY NOVEMBER 1-2, 2012 Anjan Bose, Grid Tech Team U.S. Department of Energy DOE Grid Tech Team (GTT)  The Grid Tech Team (GTT), established by the Office of the Undersecretary of Energy, was tasked with coordinating grid-related activities across the Department and accelerating modernization of the electric power system.  Currently, the GTT comprise of representatives from OE, EERE, ARPA-E, Fossil Energy, Science, Policy and International Affairs, CFO, and the Office of the Secretary of Energy. Vision of the Future Grid A seamless, cost-effective electricity system, from generation to end- use, capable of meeting all clean energy demands and capacity requirements, while allowing consumer participation and electricity

356

NWCC Transmission Case Study III  

DOE Green Energy (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

357

EPRI Increased Transmission Capacity Workshop Proceedings  

Science Conference Proceedings (OSTI)

This report documents the proceedings of EPRI's Increased Overhead Transmission Capacity Workshop. The workshop was held on September 20, 2011 at the offices of the American Transmission Company in Waukesha, Wisconsin. Participants included members of the EPRI Increased Overhead Transmission Capacity Task Force. The workshop was a joint effort of two EPRI research projects: (1) Increased Power Flow Guidebook and Ratings for Overhead Lines, and (2) Impact of High Temperature Operation on Conductor Systems...

2011-11-30T23:59:59.000Z

358

Transmission Line Security Monitor: Final Report  

SciTech Connect

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

359

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

360

Regulations for Electric Transmission and Fuel Gas Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long...

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Link power coordination for energy conservation in complex communication networks  

E-Print Network (OSTI)

Communication networks consume huge, and rapidly growing, amount of energy. However, a lot of the energy consumption is wasted due to the lack of global link power coordination in these complex systems. This paper proposes several link power coordination schemes to achieve energy-efficient routing by progressively putting some links into energy saving mode and hence aggregating traffic during periods of low traffic load. We show that the achievable energy savings not only depend on the link power coordination schemes, but also on the network topologies. In the random network, there is no scheme that can significantly outperform others. In the scale-free network, when the largest betweenness first (LBF) scheme is used, phase transition of the networks' transmission capacities during the traffic cooling down phase is observed. Motivated by this, a hybrid link power coordination scheme is proposed to significantly reduce the energy consumption in the scale-free network. In a real Internet Service Provider (ISP)'...

Zhang, Guo-Qiang

2010-01-01T23:59:59.000Z

362

A study of Schwarz converters for nuclear powered spacecraft  

DOE Green Energy (OSTI)

High power space systems which use low dc voltage, high current sources such as thermoelectric generators, will most likely require high voltage conversion for transmission purposes. This study considers the use of the Schwarz resonant converter for use as the basic building block to accomplish this low-to-high voltage conversion for either a dc or an ac spacecraft bus. The Schwarz converter has the important assets of both inherent fault tolerance and resonant operation and parallel operation in modular form is possible. A regulated dc spacecraft bus requires only a single stage converter while a constant frequency ac bus requires a cascaded Schwarz converter configuration. If the power system requires constant output power from the dc generator, then a second converter is required to route unneeded power to a ballast load.

Stuart, T.A. [Univ. of Toledo, OH (United States); Schwarze, G.E. [Lewis Research Center, Cleveland, OH (United States)

1994-09-01T23:59:59.000Z

363

DOE Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop November 1, 2012 Federal Energy Regulatory Commission Commissioner Cheryl LaFleur 1 FERC's Transmission Efforts Reliability and Grid Security Planning...

364

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Usage Transmission Transmission Once electricity is generated -- whether by burning fossil fuels; through nuclear fission; or by harnessing wind, solar, geothermal, or hydro...

365

Merchant transmission investment  

E-Print Network (OSTI)

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

366

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

367

Transmission policy in the United States  

E-Print Network (OSTI)

This paper provides an overview of the development of electric power transmission access, pricing and investment policies in the U.S. over the last 15 years and evaluates the current state of those policies. Pre-liberalization ...

Joskow, Paul L.

2004-01-01T23:59:59.000Z

368

RFI Comments - Electric Power Coalition  

Science Conference Proceedings (OSTI)

... The power grid is a complex infrastructure made up of networked generation, transmission, distribution, control, and communication technologies ...

2013-04-10T23:59:59.000Z

369

Transmission Requirements for Off-Shore Wind Integration: A study of the merits of AC and HVDC transmission connection options  

Science Conference Proceedings (OSTI)

This report presents a study of two transmission technologies, AC and HVDC, that could be employed to connect a distant wind farm to the Great Britain (GB) electricity transmission system. A review of the GB electricity transmission system industry codes makes it clear that particular consideration must be given in the design stage to the power factor and voltage control requirements at the interface between the wind farm and the transmission system. The ability of the transmission link and the wind ...

2013-11-20T23:59:59.000Z

370

Adaptive Routing for Road Traffic  

Science Conference Proceedings (OSTI)

Several technologies for motorists ease their travel on today's congested roads. However, these services aren't linked to each other and using them while driving can be dangerously distracting. This article reports on an integrated system that uses congestion ... Keywords: routing, congestion, Trafficmaster, GPS, GSM.

John Fawcett; Peter Robinson

2000-05-01T23:59:59.000Z

371

Power Contracts - Sierra Nevada Region (SNR) - Western Area Power...  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Operations Outage Coordination Standards of Conduct Transmission Planning You are here: SN Home page > Power Operations > Outage Coordination Outage Coordination Outage...

372

Power system  

DOE Patents (OSTI)

A power system includes a prime mover, a transmission, and a fluid coupler having a selectively engageable lockup clutch. The fluid coupler may be drivingly connected between the prime mover and the transmission. Additionally, the power system may include a motor/generator drivingly connected to at least one of the prime mover and the transmission. The power-system may also include power-system controls configured to execute a control method. The control method may include selecting one of a plurality of modes of operation of the power system. Additionally, the control method may include controlling the operating state of the lockup clutch dependent upon the mode of operation selected. The control method may also include controlling the operating state of the motor/generator dependent upon the mode of operation selected.

Hickam, Christopher Dale (Glasford, IL)

2008-03-18T23:59:59.000Z

373

Optimal Transmission Switching in Electric Networks for Improved Economic Operations1  

E-Print Network (OSTI)

1 Optimal Transmission Switching in Electric Networks for Improved Economic Operations1 Emily. Abstract Growing demand for electric power seems to necessitate new transmission lines, but obstacles" bulk electric grid, one that is more controllable and flexible. Optimal transmission switching

Ferris, Michael C.

374

Placing power linres : GIS helps site energy corridors.  

Science Conference Proceedings (OSTI)

Turn the lights on when you enter a room, then turn the lights off when you leave. Most of us repeat this sequence many times each day, and never give it another thought. But that seemingly simple light switch on the wall connects us to one of the most complex systems in the world: the electrical grid. Most of the United States is served by a highly reliable and adequate supply of electrical power, which is distributed through a grid of thousands of miles of electricity-transmission lines. However, as the electricity-supply infrastructure ages and consumer demand for electricity grows, the capacity to deliver electrical power hasn't kept pace with demand, and upgrading the electrical-transmission grid has become a more pressing need. From 1988-1998, demand for transmission grew by 30 percent while transmission grew by only 15 percent. From 1999-2009, demand grew by 20 percent and transmission by only 3 percent Despite a short-term decline related to the economic downturn and improved efficiency, U.S. energy consumption is expected to increase by 14 percent between 2008 and 2035. This growth will drive the need to develop viable routes for new transmission lines. Because transmission lines extend over large distances, they typically cross many federal, tribal, state, local and private land jurisdictions, each with a complex and varying set of siting issues and land-management practices. And as the existing grid needs improvement to meet growing demand, the U.S. is rapidly developing renewable energy sources, particularly solar and wind energy, often in areas far removed from existing electricity-transmission infrastructure and energy-consumption areas.

Kuiper, J. A.; Cantwell, B.; Hlohowskyj, I.; Moore, H. R. (Environmental Science Division)

2011-08-01T23:59:59.000Z

375

Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500-kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada, Northern States Power Company. Addendum to the final Environmental Assessment  

SciTech Connect

This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

Not Available

1992-10-01T23:59:59.000Z

376

Automated manual transmission mode selection controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI)

1999-11-09T23:59:59.000Z

377

Automated manual transmission shift sequence controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Richard G. (Royal Oak, MI); Rausen, David J. (Denver, CO)

2000-02-01T23:59:59.000Z

378

Arizona/Transmission/State Regulations | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State Siting Process The requirements for routing and permitting electric transmission lines are found in Arizona State Legislature Revised Statutes Title 40, Chapter 2, Article 6.2. According to statute, every person contemplating construction of any transmission line within the state during any 10-year period must file a 10-year with the Arizona Corporation Commission (ACC) on or before January 31 of each year.[1] Prior to beginning construction of a

379

PowerBeam Inc | Open Energy Information  

Open Energy Info (EERE)

PowerBeam, Inc. Place Sunnyvale, California Zip CA 94085 Product PowerBeam holds the patent to a power transmission technology that produces wireless electricity. Coordinates...

380

A comparison of routing sets for robust network design  

E-Print Network (OSTI)

compare the optimal capacity allocation costs for six routing sets: affine routing, ... made in the long term while the routing decisions depend on the realization of.

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Fountain Valley Electric Carrier Route Vehicle Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

13 miles per test. The distance of the 36 route tests ranged from 4 to 34 miles. Both miles driven and State-of- Charge (SOC) data was collected for only 28 of the route tests....

382

NIRA : a new Internet routing architecture  

E-Print Network (OSTI)

(cont.) mechanism, a user only needs to know a small region of the Internet in order to select a route to reach a destination. In addition, a novel route representation and packet forwarding scheme is designed such that a ...

Yang, Xiaowei, 1974-

2004-01-01T23:59:59.000Z

383

Kangley - Echo Lake Transmission Line Project Supplemental Draft Environmental Impact Statement  

SciTech Connect

Bonneville Power Administration (BPA) is proposing to build a new transmission line to accommodate increasing demand for electricity and address reliability concerns in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmission line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as during a winter cold snap, could cause voltage instability and a loss of power in the King County area. System planners have projected total system load using normal growth in demand and determined that system instability could develop as early as the winter of 2002-03. Besides meeting this need for system reliability, this project would enhance the United States' delivery of power to Canada as required under the Columbia River Treaty of 1961. BPA described and analyzed transmission route alternatives in a draft environmental impact statement (DEIS) released in June 2001. The DEIS identified a preferred alternative that would parallel an existing BPA transmission line through the Cedar River Municipal Watershed. BPA received over 700 comments from landowners, agencies, tribes and special interest groups on the DEIS. Many of the comments suggested BPA re-evaluate the range of alternatives considered and prepare a supplemental draft environmental impact statement (SDEIS). After reviewing the comments and refining the cost estimates associated with BPA's preferred alternative, BPA decided to prepare this SDEIS to re-evaluate alternatives not analyzed in detail in the DEIS. The added transmission alternatives, all located outside of the Cedar River Watershed, were initially considered but dropped from detailed analysis. They are identified as Alternatives A, B, C, and D. Alternatives A and C are located to the west of the Cedar River Watershed boundary. Alternatives B and D cross the Mt. Baker-Snoqualmie and Okanogan-Wenatchee National Forests. Under all transmission alternatives, Echo Lake Substation would be expanded about three acres to the east and new equipment to accommodate the new line would be installed. BPA is also considering a Non-Transmission Alternative and the No Action Alternative.

N /A

2003-01-10T23:59:59.000Z

384

Midwest Transmission Workshop III Summary  

DOE Green Energy (OSTI)

OAK-B135 On March 12-13, 2002, the National Wind Coordinating Committee (NWCC), in cooperation with regional stakeholders, held a two-day workshop: Planning for Electrical Transmission Needs in the Upper Midwest. The workshop was the outgrowth of an effort to develop a forum and process for consideration of transmission options that strives for equitable allocation of benefits and impacts among all affected parties. The goal of this workshop was to provide a catalyst for an enhanced, inclusive process for transmission planning with participation of and acceptance by all affected stakeholders. Participants in the meeting included representatives of state and regional regulatory agencies, utilities and power generators, the wind industry, environmental and landowner interests, and other interested parties (see Attachment A for a list of meeting participants).

Kevin Bryan

2003-03-12T23:59:59.000Z

385

The hidden value of transmission assets  

SciTech Connect

Numerous utilities have realized that they can do better with their transmission assets than neutering them into ISOs and have proposed the creation of for-profit transmission companies (Transcos). This would turn transmission assets into equity with higher risk but also returns potentially higher than the regulated cost of capital. This article's contribution to the ongoing debate is to show that Transcos constitute a simple and robust solution to transmission congestion problems that would otherwise jeopardize the advent of competitive power markets. Policymakers and regulators should therefore view favorably the emergence of for-profit, regulated transmission companies, and leave them with reasonable room to recover their cost and earn a fully compensatory return on investment. Regulatory benevolence is crucial for Transcos, for electric power transmission is arguably the ultimate regulated activity: significant economies of scale and wide-ranging network externalities (the infamous loop flows) make operation and management of the grid a natural monopoly that must be regulated. A significant share of the value at stake therefore hinges on the regulator's attitude towards the for-profit transmission company: if the regulator is favorable, she will leave enough room to recover the variable and capital costs. If she is unfavorable, the proposition is simply a non-starter. This article first builds a public policy argument in favor of transmission companies, then discusses the key success factors required to create significant value in transmission: regulatory prowess and superior network management.

Nasser, T.O. (McKinsey and Co., Washington, DC (United States))

1999-06-01T23:59:59.000Z

386

Microsoft Word - DOE RFI on Transmission Planning - PGE Comments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

delivery of power from multiple resource areas in California. PG&E believes that greater transmission availability enables competitive markets by providing procurement options in...

387

Transmission Problem Between Two Herschel-Bulkley Fluids  

E-Print Network (OSTI)

The paper is devoted to the study of transmission problem between two Herschel-Bulkley fluids with different viscosities, yield limits and power law index.

Farid Messelmi

2011-02-28T23:59:59.000Z

388

FRN Request for Proposals for New or Upgraded Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 AGENCY:...

389

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

states: "Plans should designate sites of power generation and the location of electric transmission lines in areas intended to support desired levels of urban and rural...

390

Report on Transmission Cost Allocation for RTOs and Others (Presentation)  

SciTech Connect

This presentation describes in summary fashion some present transmission cost allocation methods, especially as this relates to the development of utility-scale renewable power sources.

Coles, L.; Porter, K.

2011-05-01T23:59:59.000Z

391

Capacity Assessment of a Transmission Tower under Wind Loading.  

E-Print Network (OSTI)

??Transmission towers play a vital role in power distribution networks and are often subject to strong wind loads. Lattice tower design is often based on… (more)

Mara, Thomas G

2013-01-01T23:59:59.000Z

392

State space representation of routing flexibility  

Science Conference Proceedings (OSTI)

This paper describes a state space representation for sequencing and routing flexibility in manufacturing systems. Routing flexibility is represented using five different stages as follows: (i) Precedence Graph of Operations; (ii) State Transition Graph ... Keywords: Flexible manufacturing systems, Routing flexibility, Sequencing flexibility, State space representation

Leonardo Rosa Rohde; Denis Borenstein

2005-12-01T23:59:59.000Z

393

Building programmable routing service for sensor networks  

Science Conference Proceedings (OSTI)

Current routing services for sensor networks are application-specific. They are pre-configured into nodes, and thus have difficulty in adapting to different applications and network conditions. This paper describes a framework to build programmable routing ... Keywords: Energy saving, Parameterization, Programmable, Routing, Sensor networks

Yu He; Cauligi S. Raghavendra

2005-04-01T23:59:59.000Z

394

A hierarchical model for BGP routing policies  

Science Conference Proceedings (OSTI)

BGP routing policies are mainly used by network operators to enforce business relationships between Autonomous Systems (AS), and to prefer some routes over others. In this paper, we propose a hierarchical policy model to express each policy at the most ... Keywords: bgp, network configuration, routing policies

Laurent Vanbever; Bruno Quoitin; Olivier Bonaventure

2009-08-01T23:59:59.000Z

395

Xl: an efficient network routing algorithm  

Science Conference Proceedings (OSTI)

In this paper, we present a new link-state routing algorithm called Approximate Link state (XL) aimed at increasing routing efficiency by suppressing updates from parts of the network. We prove that three simple criteria for update propagation are sufficient ... Keywords: link-state, routing protocol

Kirill Levchenko; Geoffrey M. Voelker; Ramamohan Paturi; Stefan Savage

2008-08-01T23:59:59.000Z

396

On inferring and characterizing internet routing policies  

Science Conference Proceedings (OSTI)

Border Gateway Protocol allows Autonomous Systems (ASs) to apply diverse routing policies for selecting routes and for propagating reachability information to other ASs. Although a significant number of studies have been focused on the Internet topology, ... Keywords: BGP, routing policies, traffic engineering

Feng Wang; Lixin Gao

2003-10-01T23:59:59.000Z

397

Voltage Control Optimization to Improve Transmission Efficiency  

Science Conference Proceedings (OSTI)

An optimal power flow solution is unique from a conventional power flow solution in that an objective function and user-specified constraints are enforced and satisfied to reach a valid solution. This report presents an analytical study on the optimization of power flow in order to minimize reactive power losses via the modification of generator voltage schedules and transmission switched shunt status. The study examines the potential benefits and applicability of near-real-time voltage control ...

2012-11-08T23:59:59.000Z

398

AN ITERATIVE ROUTE CONSTRUCTION AND IMPROVEMENT ALGORITHM FOR THE VEHICLE ROUTING PROBLEM WITH SOFT  

E-Print Network (OSTI)

generalized costs Data: C : Set of customers to route (not including the depot 0v ) LLimit = initial number . The function k ( , )s R s orders the set of routes R from smallest to largest based on the number of customers per route and then returns a set of 1s routes with the least number of customers; e.g. k ( ,1)s R

Bertini, Robert L.

399

Independent transmission company (ITC) and markets for transmission  

E-Print Network (OSTI)

Independent Abstract-- transmission company (ITC) and markets for transmission Yong T. Yoon Marija a fundamental structure for the transmission provider (TP) composed of the independent transmission company (ITC out the associated functions including managing transmission congestion. At the minimum

Ilic, Marija D.

400

Regional Transmission Planning Webinar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

402

Application of Two-Speed Dual Clutch Transmission in Pure Electric Vehicle  

Science Conference Proceedings (OSTI)

Two-speed dual clutch transmission is used in electric vehicle to improve vehicle power performance and efficiency of an electric driveline. To illustrate the improvement of power performance and efficiency, single-speed transmission system was introduced ... Keywords: pure electric vehicle, dual clutch transmission, single-speed transmission

Yongdao Song; Xiusheng Cheng; Zhonghua Lu; Xueshong Li

2012-10-01T23:59:59.000Z

403

Three essays concerning information transmission  

E-Print Network (OSTI)

Transmissionas an Information-Transmission Mechanism,” American EconomicConcerning Information Transmission A dissertation submitted

Boone, Johnathan

2010-01-01T23:59:59.000Z

404

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

405

ROD for the Interconnection of the Griffith Power Plant With the Western Area Power Administration's Parker-Davis and Pacific Northwest-Pacific Southwest Intertie Transmission Systems (5/28/99)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23 23 Federal Register / Vol. 64, No. 103 / Friday, May 28, 1999 / Notices 129, Main Street, Madison, ME 04950, (207) 696-1225. l. FERC contact: Nan Allen, nan.allen@ferc.fed.us, (202) 219-2948. m. Pursuant to 18 CFR 16.9(b)(1) each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by May 1, 2002. David P. Boergers, Secretary. [FR Doc. 99-13617 Filed 5-27-99; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Western Area Power Administration [DOE/EIS-0297] Record of Decision for the Interconnection of the Griffith Power Plant With the Western Area Power Administration's Parker-Davis and Pacific Northwest-Pacific Southwest

406

RM Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

in 1990. The projects serve Colorado, Kansas, Nebraska and Wyoming with 830 MW of installed capacity and 3,360 miles of transmission line. About Power Marketing...

407

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

408

A Real Time Price Signal for FACTS Devices to Reduce Transmission Congestion  

Science Conference Proceedings (OSTI)

The challenge of operating the electric power system while not being able to directly control power flows on the transmission grid is exacerbated as industry restructuring substantially alters the use of the aging transmission system. This paper investigates ...

Judith Cardell

2007-01-01T23:59:59.000Z

409

Electricity generation with looped transmission networks: Bidding to an ISO  

E-Print Network (OSTI)

Electricity generation with looped transmission networks: Bidding to an ISO Xinmin Hu Daniel Ralph to model markets for delivery of electrical power on looped transmission networks. It analyzes in transmission capacity mean the ISO potentially sets a different electricity price at each node of the trans

Ferris, Michael C.

410

Transmission Pricing and Congestion Management: Efficiency, Simplicity and Open Access  

E-Print Network (OSTI)

to the transmission grid is the essential centerpiece for a competitive electricity market. Order 888 and Order 889 for the electric power industry restructuring. These orders provide guidelines for nondiscriminatory transmission functions of the ISO. In an open access, competitive electricity system a transmission pricing scheme should

Oren, Shmuel S.

411

EIS-0474: Southline Transmission Project, Arizona and New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

DOE’s Western Area Power Administration is preparing this EIS to evaluate the environmental impacts of the proposed Southline Transmission Project, which would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing transmission lines between the Apache and Saguaro, Arizona substations.

412

Environmental analysis of proposed 230 kV transmission line from Teeland substation to Reed substation  

SciTech Connect

The environmental effects of an electric power transmission line approximately 20 miles long proposed near Anchorage, Alaska, are discussed.

1975-01-01T23:59:59.000Z

413

POWER MARKETING ADMINISTRATIONS'INSTALLATION OF FIBER OPTICS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(Bonneville), Western Area Power Administration (Western), and Southwestern Power Administration (Southwestern) - own and operate transmission lines that cross 22...

414

Semantic Routed Network for Distributed Search Engines  

E-Print Network (OSTI)

Searching for textual information has become an important activity on the web. To satisfy the rising demand and user expectations, search systems should be fast, scalable and deliver relevant results. To decide which objects should be retrieved, search systems should compare holistic meanings of queries and text document objects, as perceived by humans. Existing techniques do not enable correct comparison of composite holistic meanings like: "evidences on role of DR2 gene in development of diabetes in Caucasian population", which is composed of multiple elementary meanings: "evidence", "DR2 gene", etc. Thus these techniques can not discern objects that have a common set of keywords but convey different meanings. Hence we need new methods to compare composite meanings for superior search quality. In distributed search engines, for scalability, speed and efficiency, index entries should be systematically distributed across multiple index-server nodes based on the meaning of the objects. Furthermore, queries should be selectively sent to those index nodes which have relevant entries. This requires an overlay Semantic Routed Network which will route messages, based on meaning. This network will consist of fast response networking appliances called semantic routers. These appliances need to: (a) carry out sophisticated meaning comparison computations at high speed; and (b) have the right kind of behavior to automatically organize an optimal index system. This dissertation presents the following artifacts that enable the above requirements: (1) An algebraic theory, a design of a data structure and related techniques to efficiently compare composite meanings. (2) Algorithms and accelerator architectures for high speed meaning comparisons inside semantic routers and index-server nodes. (3) An overlay network to deliver search queries to the index nodes based on meanings. (4) Algorithms to construct a self-organizing, distributed meaning based index system. The proposed techniques can compare composite meanings ~105 times faster than an equivalent software code and existing hardware designs. Whereas, the proposed index organization approach can lead to 33% savings in number of servers and power consumption in a model search engine having 700,000 servers. Therefore, using all these techniques, it is possible to design a Semantic Routed Network which has a potential to improve search results and response time, while saving resources.

Biswas, Amitava

2010-05-01T23:59:59.000Z

415

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

Planning.pdf NWCC. 2007a. FERC Order 890: What Does It Meanof wholesale power competition. FERC Order 2000 providesISO/RTO are being pushed by FERC to expand the transmission

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

416

Transmission Policies for Asymmetric Interference Channels with Energy Harvesting Nodes  

E-Print Network (OSTI)

Transmission Policies for Asymmetric Interference Channels with Energy Harvesting Nodes Kaya power policies to maximize sum capacity in an energy harvesting setting. It is shown derive optimal power allocation policies for interference channels comprised of energy harvesting

Yener, Aylin

417

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

418

Arnold Schwarzenegger TRANSMISSION BENEFIT  

E-Print Network (OSTI)

California Edison's (SCE) initial Tehachapi transmission trunk-line proposal for integration of wind. The Tehachapi Transmission Project to integrate 4,500 MW of renewable wind energy has since been approved after

419

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Line Line (Redirected from Definition:Transmission lines) Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

420

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Transmission Investment Incentives  

Science Conference Proceedings (OSTI)

This report documents the use of agent-based simulation as a tool for studying transmission investment incentives, and it is meant to illuminate what accounts for the difficulties in aligning incentives for enhancing the transmission system. The report suggests that a new method of calculation for bid optimization be applied to the economic analysis of long-term incentives for transmission investment. This technology can be broadly applied to help negotiators in transmission planning quantify their count...

2006-12-21T23:59:59.000Z

422

ELECTRICITY TRANSMISSION IN DEREGULATED MARKETS; CONFERENCE AT CARNEGIE MELLON UNIVERSITY, PITTSBURGH PA USA DECEMBER 2004 1 A criticality approach to monitoring cascading  

E-Print Network (OSTI)

ELECTRICITY TRANSMISSION IN DEREGULATED MARKETS; CONFERENCE AT CARNEGIE MELLON UNIVERSITY the risk of cascading failure of electric power transmission systems as overall loading is increased failure is the usual mechanism for large blackouts of electric power transmission systems. For example

Dobson, Ian

423

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

cable transmission systems:5 two 500 kV circuits, a high-voltage direct current (HVDC) system and two to serve VI and the HVDC link is expected to be completely retired in 2007. This erosion in transmission / replacement of the HVDC cables (at a cost of $230 million), as well as transmission upgrades on the mainland

424

Engineering Technical Training Module (ETTM) - Instrumentation Sensing, Line Routing, and Separation Version 1.0  

Science Conference Proceedings (OSTI)

Engineering Technical Training Module (ETTM) – Instrumentation Sensing, Line Routing, and Separation, Version 1.0 is a computer-based training module that allows users to access training when desired and review it at their own pace.This course provides training for Power Plant Instrumentation Engineers on instrumentation sensing line devices, their functions, and recommended use in nuclear plants.  This module will familiarize the student with guidelines for routing and ...

2013-08-08T23:59:59.000Z

425

Power and energy  

Science Conference Proceedings (OSTI)

The design and manufacture of electric power equipment, the one electrotechnology in which Europe could gain worldwide dominance by the end of the century, is examined. All three power-equipment categories-generation, transmission, and distribution-are ...

G. Zorpette

1990-04-01T23:59:59.000Z

426

2006 National Electric Transmission Congestion Study and Related Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study and Related 6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints and identifies areas that are transmission-constrained. This is the first Congestion Study the Department conducted. Based on this study, two National Interest Electric Transmission Corridors were designated in 2007. They were invalidated by a federal appeals court in 2011. Comments and form letters were submitted by the public in response to this study. National Electric Transmission Congestion Study 2006 Executive Summary Full Text of the National Electric Transmission Congestion Study 2006

427

RAIL ROUTING PRACTICES AND PROPOSED ALTERNATIVES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

"Strawman" Report: "Strawman" Report: RAIL ROUTING PRACTICES AND PROPOSED ALTERNATIVES Number Section Comment Response RTG-1-AAR SECTION II Safeguards Routing Regulations, Para. 2 The NRC has identified five types of route characteristics that receive special consideration when NRC staff review routes for approval pursuant to 10 CFR 73: (1) routes through highly populated areas; (2) routes that would place the shipment or escort vehicle in a significantly disadvantageous position (for example, tunnels which would prevent the escort vehicle from maintaining continuous surveillance of the shipment vehicle); [Note this assumes a highway chase vehicle for rail. We expect security for rail shipments to be on the train with the shipment, and not a chase vehicle. Chase vehicles has their own inherent

428

Self-Adjustable Trust-Based Energy Efficient Routing for Smart Grid Systems  

Science Conference Proceedings (OSTI)

Smart Grid is the trend of next generation electrical power system which makes the power grid intelligent and energy efficient. It requires high level of network reliability to support two-way communication among electrical services, electrical units ... Keywords: Smart Grid, wireless mesh network, trust-based geographical routing, vulnearabilities and attacks, energy efficiency

Ming Xiang; Quan Bai; William Liu

2012-12-01T23:59:59.000Z

429

Multiple Use of Existing Transmission Corridors  

Science Conference Proceedings (OSTI)

Multiple use utility corridors can provide significant benefits for the utilities and the public. However, increasing the power flow in the power system can raise compatibility issues with other utilities or systems that share the corridor. This report provides case studies of three common corridors for which compatibility issues were raised as a result of planned increases in power transmission capacity. The case studies review the criteria used to evaluate compatibility and the need for mitigation meas...

2007-12-18T23:59:59.000Z

430

Overhead Transmission Line Inspector Workshop Proceedings - 2012  

Science Conference Proceedings (OSTI)

 This report presents the proceedings of the Electric Power Research Institute (EPRI) Overhead Transmission Line Inspector Workshop, which was held Monday, July 30, through Wednesday, August 1, 2012, at the Hyatt Place Hotel and at Georgia Power’s Klondike Training Center in Lithonia, Georgia.The first half day of the workshop focused on inspection and assessment, with a participant roundtable discussion, followed by utility, vendor and EPRI presentations on the ...

2012-11-14T23:59:59.000Z

431

Coordination of Federal Authorizations for Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordination of Federal Authorizations for Electric Transmission Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy ("DOE") for its ongoing commitment to implement the provisions of the Energy Policy Act of 2005 ("EPAct"), specifically, as addressed here, the DOE's continuing effort to establish procedures under which entities may request that DOE coordinate Federal authorizations for the siting of interstate transmission facilities. Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule

432

IntelliGrid Transmission Architecture Development  

Science Conference Proceedings (OSTI)

Objective Future transmission system operations require the development of a distributed computing infrastructure that can keep up with the demands of new applications as well as the technical pressures being placed on power systems. This project identifies issues related to the supporting communications and distributed computing infrastructures necessary to support the next generation of transmission monitoring, control, and operations. Although substantial work has been completed, more is needed to dev...

2008-03-31T23:59:59.000Z

433

Information Sharing Across Transmission and Distribution Operations  

Science Conference Proceedings (OSTI)

In the real-time operation of the grid, there is a natural dividing line between the bulk power, or transmission, system and the distribution system. The increasing deployment of distributed resourcesincluding distributed energy resources (distributed generation) and curtailable load (demand response)will require update of transmission and distribution system processes and applications that ensure reliable and efficient grid operation. Closer coordination of activities will be necessary as both systems a...

2010-12-22T23:59:59.000Z

434

Definition: Transmission Service Provider | Open Energy Information  

Open Energy Info (EERE)

Transmission Service Provider The entity that administers the transmission tariff and provides Transmission Service to Transmission Customers under applicable...

435

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications 2013 Transmission Reliability Program Peer Review - Day 1...

436

Large Neighborhood Search for LNG Inventory Routing  

E-Print Network (OSTI)

Feb 3, 2012 ... Large Neighborhood Search for LNG Inventory Routing. Vikas Goel (vikas.goel ** *at*** exxonmobil.com) Kevin Furman (kevin.c.furman ***at*** ...

437

MIRPLib: A Maritime Inventory Routing Problem Library  

E-Print Network (OSTI)

Aug 28, 2013 ... Abstract: This paper presents a detailed description of a particular class of deterministic single product maritime inventory routing problems ...

438

UFO: A Resilient Layered Routing Architecture  

E-Print Network (OSTI)

Conventional wisdom has held that routing protocols cannot achieve both scalability and high availability. Despite scaling relatively well, today’s Internet routing system does not react quickly to changing network conditions (e.g., link failures or excessive congestion). Overlay networks, on the other hand, can respond quickly to changing network conditions, but their reliance on aggressive probing does not scale to large topologies. The paper presents a layered routing architecture called UFO (Underlay Fused with Overlays), which achieves the best of both worlds by having the “underlay” provide explicit notification about network conditions to help improve the efficiency and scalability of routing overlays.

Yaping Zhu; Andy Bavier; Nick Feamster; Sampath Rangarajan; Jennifer Rexford

2008-01-01T23:59:59.000Z

439

Network harness: bundles of routes in public transport networks  

E-Print Network (OSTI)

Public transport routes sharing the same grid of streets and tracks are often found to proceed in parallel along shorter or longer sequences of stations. Similar phenomena are observed in other networks built with space consuming links such as cables, vessels, pipes, neurons, etc. In the case of public transport networks (PTNs) this behavior may be easily worked out on the basis of sequences of stations serviced by each route. To quantify this behavior we use the recently introduced notion of network harness. It is described by the harness distribution P(r,s): the number of sequences of s consecutive stations that are serviced by r parallel routes. For certain PTNs that we have analyzed we observe that the harness distribution may be described by power laws. These power laws observed indicate a certain level of organization and planning which may be driven by the need to minimize the costs of infrastructure and secondly by the fact that points of interest tend to be clustered in certain locations of a city. T...

Berche, B; Holovatch, T

2009-01-01T23:59:59.000Z

440

Energy Transmission and Infrastructure  

SciTech Connect

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

A New Route to Nano Self-Assembly  

NLE Websites -- All DOE Office Websites (Extended Search)

A New Route to Nano Self-Assembly Print A New Route to Nano Self-Assembly Print If the promise of nanotechnology is to be fulfilled, nanoparticles will have to be able to make something of themselves. An important advance toward this goal has been achieved by researchers who have found a simple and yet powerfully robust way to induce nanoparticles to assemble themselves into complex arrays. By adding specific types of small molecules to mixtures of nanoparticles and polymers, they were able to direct the self-assembly of the nanoparticles into arrays of one, two, and even three dimensions with no chemical modification of either the nanoparticles or the block copolymers. In addition, the application of external stimuli, such as light and/or heat, can be used to further direct the assemblies of nanoparticles for even finer and more complex structural details, a result verified by small-angle x-ray scattering (SAXS) at the ALS.

442

A New Route to Nano Self-Assembly  

NLE Websites -- All DOE Office Websites (Extended Search)

A New Route to Nano Self-Assembly Print A New Route to Nano Self-Assembly Print If the promise of nanotechnology is to be fulfilled, nanoparticles will have to be able to make something of themselves. An important advance toward this goal has been achieved by researchers who have found a simple and yet powerfully robust way to induce nanoparticles to assemble themselves into complex arrays. By adding specific types of small molecules to mixtures of nanoparticles and polymers, they were able to direct the self-assembly of the nanoparticles into arrays of one, two, and even three dimensions with no chemical modification of either the nanoparticles or the block copolymers. In addition, the application of external stimuli, such as light and/or heat, can be used to further direct the assemblies of nanoparticles for even finer and more complex structural details, a result verified by small-angle x-ray scattering (SAXS) at the ALS.

443

A New Route to Nano Self-Assembly  

NLE Websites -- All DOE Office Websites (Extended Search)

A New Route to Nano Self-Assembly Print A New Route to Nano Self-Assembly Print If the promise of nanotechnology is to be fulfilled, nanoparticles will have to be able to make something of themselves. An important advance toward this goal has been achieved by researchers who have found a simple and yet powerfully robust way to induce nanoparticles to assemble themselves into complex arrays. By adding specific types of small molecules to mixtures of nanoparticles and polymers, they were able to direct the self-assembly of the nanoparticles into arrays of one, two, and even three dimensions with no chemical modification of either the nanoparticles or the block copolymers. In addition, the application of external stimuli, such as light and/or heat, can be used to further direct the assemblies of nanoparticles for even finer and more complex structural details, a result verified by small-angle x-ray scattering (SAXS) at the ALS.

444

A New Route to Nano Self-Assembly  

NLE Websites -- All DOE Office Websites (Extended Search)

A New Route to Nano Self-Assembly Print A New Route to Nano Self-Assembly Print If the promise of nanotechnology is to be fulfilled, nanoparticles will have to be able to make something of themselves. An important advance toward this goal has been achieved by researchers who have found a simple and yet powerfully robust way to induce nanoparticles to assemble themselves into complex arrays. By adding specific types of small molecules to mixtures of nanoparticles and polymers, they were able to direct the self-assembly of the nanoparticles into arrays of one, two, and even three dimensions with no chemical modification of either the nanoparticles or the block copolymers. In addition, the application of external stimuli, such as light and/or heat, can be used to further direct the assemblies of nanoparticles for even finer and more complex structural details, a result verified by small-angle x-ray scattering (SAXS) at the ALS.

445

A New Route to Nano Self-Assembly  

NLE Websites -- All DOE Office Websites (Extended Search)

A New Route to Nano Self-Assembly Print A New Route to Nano Self-Assembly Print If the promise of nanotechnology is to be fulfilled, nanoparticles will have to be able to make something of themselves. An important advance toward this goal has been achieved by researchers who have found a simple and yet powerfully robust way to induce nanoparticles to assemble themselves into complex arrays. By adding specific types of small molecules to mixtures of nanoparticles and polymers, they were able to direct the self-assembly of the nanoparticles into arrays of one, two, and even three dimensions with no chemical modification of either the nanoparticles or the block copolymers. In addition, the application of external stimuli, such as light and/or heat, can be used to further direct the assemblies of nanoparticles for even finer and more complex structural details, a result verified by small-angle x-ray scattering (SAXS) at the ALS.

446

A New Route to Nano Self-Assembly  

NLE Websites -- All DOE Office Websites (Extended Search)

A New Route to Nano Self-Assembly Print A New Route to Nano Self-Assembly Print If the promise of nanotechnology is to be fulfilled, nanoparticles will have to be able to make something of themselves. An important advance toward this goal has been achieved by researchers who have found a simple and yet powerfully robust way to induce nanoparticles to assemble themselves into complex arrays. By adding specific types of small molecules to mixtures of nanoparticles and polymers, they were able to direct the self-assembly of the nanoparticles into arrays of one, two, and even three dimensions with no chemical modification of either the nanoparticles or the block copolymers. In addition, the application of external stimuli, such as light and/or heat, can be used to further direct the assemblies of nanoparticles for even finer and more complex structural details, a result verified by small-angle x-ray scattering (SAXS) at the ALS.

447

A New Route to Nano Self-Assembly  

NLE Websites -- All DOE Office Websites (Extended Search)

A New Route to Nano Self-Assembly Print A New Route to Nano Self-Assembly Print If the promise of nanotechnology is to be fulfilled, nanoparticles will have to be able to make something of themselves. An important advance toward this goal has been achieved by researchers who have found a simple and yet powerfully robust way to induce nanoparticles to assemble themselves into complex arrays. By adding specific types of small molecules to mixtures of nanoparticles and polymers, they were able to direct the self-assembly of the nanoparticles into arrays of one, two, and even three dimensions with no chemical modification of either the nanoparticles or the block copolymers. In addition, the application of external stimuli, such as light and/or heat, can be used to further direct the assemblies of nanoparticles for even finer and more complex structural details, a result verified by small-angle x-ray scattering (SAXS) at the ALS.

448

High Power Converters for Efficient Transmission Solutions  

Science Conference Proceedings (OSTI)

... Single Valve Double Valve Quadruple Valve ... Includes 14 x 250 MVA 1-phase converter ... Serves 80 x 5 MW offshore wind turbine generators ...

2013-03-01T23:59:59.000Z

449

HVDC power transmission environmental issues review  

SciTech Connect

This report strives to define the various environmental effects associated with HVDC lines, discusses the current knowledge of their potential effects on biological and non-biological systems, and compares these effects associated with ac lines where appropriate.

Bailey, W.H.; Weil, D.E. [Bailey Research Associates, Inc., New York, NY (United States); Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States)

1997-04-01T23:59:59.000Z

450

Western Area Power Administration Transmission Infrastructure...  

NLE Websites -- All DOE Office Websites (Extended Search)

OVERALL ED5-PVH PROJECT BENEFITS April 2011 19 * "Right-sized" to promote renewable energy development in region, especially solar * Stimulate local economy - jobs * Upgrading...

451

NREL: Transmission Grid Integration - Webinars  

NLE Websites -- All DOE Office Websites (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

452

transmission | OpenEI Community  

Open Energy Info (EERE)

21 21 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235321 Varnish cache server transmission Home Kyoung's picture Submitted by Kyoung(155) Contributor 12 November, 2012 - 09:17 Legal Reviews are Underway BHFS Legal review permitting power plant roadmap transmission The legal review of the Regulatory Roadmap flowcharts and supporting content is well underway and will continue for the next several months with our legal team at [www.bhfs.com Brownstein Hyatt Farber and Schreck]. The

453

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

454

Routing SCADA data through an enterprise WAN  

SciTech Connect

Houston Lighting and Power (HL and P) and many other large utilities have investigated substantial resources in developing integrated enterprise wide area networks (WANs). The WAN provides unprecedented opportunities for integrating information throughout the corporation, resulting in improved efficiency and reduced costs of operation. In contrast, present dedicated point-to-point SCADA data circuits from the energy management system (EMS) to remote terminal units (RTUs) are not currently integrated with the network, nor replicated in any offsite backup system. An integrated approach might integrate communications from selected RTUs over the WAN to a backup system or the EMS. Such an approach would potentially provide improved disaster recovery, more efficient use of communications, reduced maintenance costs, and improved availability of operational data. RTU data, however, is fundamentally different from most other WAN traffic in that it is critical to the moment-to-moment operation of the utility and consists of a large number of messages repeated frequently and continuously. There are valid concerns as to whether the stability, availability, and inherent latency of the WAN would be adequate to support operations of a backup or primary SCADA system. There are also concerns about the adverse effects that SCADA traffic might have on the WAN. These concerns led to the project featured in this article, which tested the operational suitability and effectiveness of routing SCADA data between selected RTUs and a central site on the WAN.

Flowers, T.; Houle, B. [Houston Lighting and Power, TX (United States); Retzer, J.; Ramanathan, R. [National Systems and Research, Camas, WA (United States)

1995-07-01T23:59:59.000Z

455

Best routes selection in international intermodal networks  

Science Conference Proceedings (OSTI)

This study focuses on one of the intermodal operational issues: how to select best routes for shipments through the international intermodal network. International intermodal routing is complicated by three important characteristics: (1) multiple objectives; ... Keywords: Economies of scale, Intermodal, Multicommodity, Multiobjective

Tsung-Sheng Chang

2008-09-01T23:59:59.000Z

456

An autonomic routing framework for sensor networks  

Science Conference Proceedings (OSTI)

Current routing services for sensor networks are often designed for specific applications and network conditions, thus have difficulty in adapting to application and network dynamics. This paper proposes an autonomic framework to promote the adaptivity ... Keywords: Autonomic routing, Feature functions, Monitoring policies, Sensor networks

Yu He; Cauligi S. Raghavendra; Steven Berson; Robert Braden

2006-04-01T23:59:59.000Z

457

Jumping ant routing algorithm for sensor networks  

Science Conference Proceedings (OSTI)

Enterprises that may rely on critical equipments which are constantly moving around, for example, hospitals - need to ensure they can know the current location of vital but mobile assets. Besides, the sensor node on each device should inform us whether ... Keywords: ARAMA (Ant Routing Algorithm for Mobile Ad-hoc Networks), Ad-hoc, JARA (Jumping Ant Routing Algorithm), MANET

Wei-Ming Chen; Chung-Sheng Li; Fu-Yu Chiang; Han-Chieh Chao

2007-10-01T23:59:59.000Z

458

Shortage leads to green route to olefins  

Science Conference Proceedings (OSTI)

A new study examines a green route to glycerol via ultraviolet irradiation of fats and vegetable oils that may lead to a biobased source of acrylic acid and long-chain olefins. Shortage leads to green route to olefins Publications aocs articles bo

459

Understanding slow BGP routing table transfers  

Science Conference Proceedings (OSTI)

Researchers and network operators often say that BGP table transfers are slow. Despite this common knowledge, the reasons for slow BGP transfers are not well understood. This paper explains BGP table transfer delays by combining BGP messages collected ... Keywords: bgp, route propagation, routing convergence

Zied Ben Houidi; Mickael Meulle; Renata Teixeira

2009-11-01T23:59:59.000Z

460

Advanced Routing Worm and Its Security Challenges  

Science Conference Proceedings (OSTI)

Most well-known worms, such as Code Red, Slammer, Blaster, and Sasser, infected vulnerable computers by scanning the entire IPv4 address space. In this article, the authors present an advanced worm called the "routing worm," which implements two new ... Keywords: Network security, modeling, routing worm

Cliff C. Zou; Don Towsley; Weibo Gong; Songlin Cai

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

All-to-all disjoint multipath routing using cycle embedding  

Science Conference Proceedings (OSTI)

In this paper, we evaluate the performance of disjoint multipath routing approaches for all-to-all routing in packet-switched networks with respect to packet overhead, path length, and routing table size. We develop a novel approach based on cycle embedding ... Keywords: All-to-all routing, Cycle embedding, Disjoint multipath routing

Sandeep K. Ahuja; Srinivasan Ramasubramanian

2008-05-01T23:59:59.000Z

462

Video Transmission Jerkiness Measure.  

E-Print Network (OSTI)

??Digital video transmission is widely used nowadays in multimedia. Frame dropping, freeze and reduced number of frames in the transmitted video are common symptoms of… (more)

Abdelsamad, Deena

2013-01-01T23:59:59.000Z

463

NIST Transmission SEM  

Science Conference Proceedings (OSTI)

... As a result, more electrons will scatter, to provide the ... RR Keller, "Transmission EBSD in the Scanning Electron Microscope," Microscopy Today vol. ...

2013-07-29T23:59:59.000Z

464

Patterns of transmission investment  

E-Print Network (OSTI)

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

465

Highway and interline transportation routing models  

Science Conference Proceedings (OSTI)

The potential impacts associated with the transportation of hazardous materials are important issues to shippers, carriers, and the general public. Since transportation routes are a central characteristic in most of these issues, the prediction of likely routes is the first step toward the resolution of these issues. In addition, US Department of Transportation requirements (HM-164) mandate specific routes for shipments of highway controlled quantities of radioactive materials. In response to these needs, two routing models have been developed at Oak Ridge National Laboratory under the sponsorship of the U.S. Department of Energy (DOE). These models have been designated by DOE`s Office of Environmental Restoration and Waste Management, Transportation Management Division (DOE/EM) as the official DOE routing models. Both models, HIGHWAY and INTERLINE, are described.

Joy, D.S.; Johnson, P.E.

1994-06-01T23:59:59.000Z

466

Property:EIA/861/ActivityTransmission | Open Energy Information  

Open Energy Info (EERE)

EIA/861/ActivityTransmission EIA/861/ActivityTransmission Jump to: navigation, search This is a property of type Boolean. Description: Activity Transmission Entity engages in power transmission activity (Y or N) [1] References ↑ EIA Form EIA-861 Final Data File for 2008 - F861 File Layout-2008.doc Pages using the property "EIA/861/ActivityTransmission" Showing 25 pages using this property. (previous 25) (next 25) A A & N Electric Coop (Virginia) + true + AEP Texas Central Company + true + AEP Texas North Company + true + Alabama Power Co + true + Alaska Electric & Energy Coop + true + Alaska Electric Light&Power Co + true + Alaska Energy Authority + true + Alaska Power and Telephone Co + true + Allegheny Electric Coop Inc + true + Ameren Illinois Company + true +

467

Microsoft Word - LS Power Comments.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Reinvestment Act of 2009 ("Recovery Act"). 1. Introduction LS Power is an independent power generation and transmission group with a proven track record of successful...

468

Western Area Power Administration, Desert Southwest Region  

NLE Websites -- All DOE Office Websites (Extended Search)

5 Western Area Power Administration, Desert Southwest Region Liberty-Parker 2 230-kV Transmission Line Optical Power Ground Wire Repairs - Continuation Sheet Project Description...

469

Laboratory Shuttle Bus Routes: Potter St./JBEI Shuttle Bus Routes  

NLE Websites -- All DOE Office Websites (Extended Search)

Combined Routes & Schedules Blue Route Orange Route Rockridge Route Potter St./JBEI Route Combined Routes & Schedules Blue Route Orange Route Rockridge Route Potter St./JBEI Route Potter St./JBEI Map Scroll down or click here for schedule ↓ Printable Map | Printable Schedule Potter St/JBEI Route Potter St./JBEI Schedule Bus Service @ lbl.gov email link LBNL - POTTER ST/JBEI START - LBL STOP 65 CORY HALL SHATTUCK BART JCAP POTTER CFO JBEI SHATTUCK BART CORY HALL Depart on the 08's and 38's Depart on the 10's and 40's Depart on the 15's and 45's Depart on the 28's and 58's Depart on the 00's and 30's Depart on the 05's and 35's Depart on the 08's and 35's Depart on the 20's and 50's Depart on the 25's and 55's 1 8:08 AM 8:10 AM 8:15 AM 8:28 AM 8:30 AM 8:35 AM 8:38 AM 8:50 AM 8:55 AM 2 8:38 AM 8:40 AM 8:45 AM 8:58 AM 9:00 AM 9:05 AM 9:08 AM 9:20 AM 9:25 AM

470

PP-234 Baja California Power Inc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

234 Baja California Power Inc PP-234 Baja California Power Inc Presidential permit authorizing Baja California Power Inc to construct, operate, and maintain electric transmission...

471

GTT 2012 Transmission Workshop - Documents | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop - Documents Transmission Workshop - Documents GTT 2012 Transmission Workshop - Documents Use the links below to download documents from the GTT's Transmission Workshop, held November 1-2, 2012 Agenda Roster of Attendees Presentation - Overview - Anjan Bose, DOE Presentation - EERE Issues and Opportunities - David Danielson, DOE Presentation - Vision for the Future - Lauren Azar, DOE Presentation - Tomorrow's Power System - Michael Heyeck, EPRI Presentation - FERC Overview - Cheryl LaFleur, FERC Presentation - ISO/RTO Challenges and Opportunities - Carl Monroe, Southwest Power Pool Product - Future Vision & Grid Challenges: Summary Results of Breakout Group Discussions Product - Opportunities to Overcome Key Challenges: Summary Results of Breakout Group Discussions Product - Final Discussion Summary Report

472

Colorado/Transmission/Regulatory Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission Regulatory Roadmap Roadmap State Data Regulatory Overview General TOOLS Regulatory Roadmap Regulatory Wizard Best Practices Document Library NEPA Database Glossary TECHNOLOGIES Geothermal Solar Water Wind TOPICS Land Use Planning Land Access Exploration Well Field Power Plant Transmission Water Rights Environment The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart

473

Opportunistic Routing in Ad Hoc Networks: How many relays should there be? What rate should nodes use?  

E-Print Network (OSTI)

Opportunistic routing is a multi-hop routing scheme which allows for selection of the best immediately available relay. In blind opportunistic routing protocols, where transmitters blindly broadcast without knowledge of the surrounding nodes, two fundamental design parameters are the node transmission probability and the transmission spectral efficiency. In this paper these parameters are selected to maximize end-to-end performance, characterized by the product of transmitter density, hop distance and rate. Due to the intractability of the problem as stated, an approximation function is examined which proves reasonably accurate. Our results show how the above design parameters should be selected based on inherent system parameters such as the path loss exponent and the noise level.

Blomer, Joseph

2010-01-01T23:59:59.000Z

474

The progressive transmission disadvantage  

Science Conference Proceedings (OSTI)

The disadvantage of progressive transmission, compared to transmission in a single step, is analyzed for the high-rate case using a polytope that is self-similar under binary subdivision. This disadvantage is calculated to be 0.3424 dB or 0.057 bit compared ...

M. J. Durst

1997-01-01T23:59:59.000Z

475

Improving the interaction between overlay routing and traffic engineering  

Science Conference Proceedings (OSTI)

Overlay routing has been successful as an incremental method to improve Internet routing by allowing its own users to select their logical routing. In the meantime, traffic engineering (TE) are being used to reduce the whole network cost by adapting ...

Gene Moo Lee; Taehwan Choi

2008-05-01T23:59:59.000Z

476

Routing Protocols and Concepts, CCNA Exploration Companion Guide  

Science Conference Proceedings (OSTI)

Routing Protocols and Concepts CCNA Exploration Companion Guide Routing Protocols and Concepts, CCNA Exploration Companion Guide is the official supplemental textbook for the Routing Protocols and Concepts course in the Cisco Networking Academy CCNA ...

Rick Graziani; Allan Johnson

2007-12-01T23:59:59.000Z

477

ORNL and SuperPower Sign Superconducting Wire Agreement  

for more efficient transmission of electricity. ... line networks; and increase power-transmission capacity. Second-generation (2G) wires made by

478

A Simple Cooperative Transmission Protocol for Energy-Efficient Broadcasting Over Multi-Hop Wireless Networks  

E-Print Network (OSTI)

This paper analyzes a broadcasting technique for wireless multi-hop sensor networks that uses a form of cooperative diversity called opportunistic large arrays (OLAs). We propose a method for autonomous scheduling of the nodes, which limits the nodes that relay and saves as much as 32% of the transmit energy compared to other broadcast approaches, without requiring Global Positioning System (GPS), individual node addressing, or inter-node interaction. This energy-saving is a result of cross-layer interaction, in the sense that the Medium Access Control (MAC) and routing functions are partially executed in the Physical (PHY) layer. Our proposed method is called OLA with a transmission threshold (OLA-T), where a node compares its received power to a threshold to decide if it should forward. We also investigate OLA with variable threshold (OLA-VT), which optimizes the thresholds as a function of level. OLA-T and OLA-VT are compared with OLA broadcasting without a transmission threshold, each in their minimum ene...

Kailas, Aravind; Ingram, Mary Ann

2009-01-01T23:59:59.000Z

479

Integrated Decision Algorithms for Auto-steered Electric Transmission System Asset Management  

Science Conference Proceedings (OSTI)

Electric power transmission systems are comprised of a large number of physical assets, including transmission lines, power transformers, and circuit breakers, that are capital-intensive, highly distributed, and may fail. Managing these assets under ... Keywords: Benders decomposition, asset management, condition monitoring, decision algorithms, electric transmission, optimization, service-oriented architecture, software-hardware

James Mccalley; Vasant Honavar; Sarah Ryan; William Meeker; Daji Qiao; Ron Roberts; Yuan Li; Jyotishman Pathak; Mujing Ye; Yili Hong

2007-05-01T23:59:59.000Z

480

A New Route to Nano Self-Assembly  

NLE Websites -- All DOE Office Websites (Extended Search)

A New Route to Nano Self-Assembly A New Route to Nano Self-Assembly A New Route to Nano Self-Assembly Print Wednesday, 24 February 2010 00:00 If the promise of nanotechnology is to be fulfilled, nanoparticles will have to be able to make something of themselves. An important advance toward this goal has been achieved by researchers who have found a simple and yet powerfully robust way to induce nanoparticles to assemble themselves into complex arrays. By adding specific types of small molecules to mixtures of nanoparticles and polymers, they were able to direct the self-assembly of the nanoparticles into arrays of one, two, and even three dimensions with no chemical modification of either the nanoparticles or the block copolymers. In addition, the application of external stimuli, such as light and/or heat, can be used to further direct the assemblies of nanoparticles for even finer and more complex structural details, a result verified by small-angle x-ray scattering (SAXS) at the ALS.

Note: This page contains sample records for the topic "transmission power routing" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Wyoming/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Wyoming/Transmission < Wyoming Jump to: navigation, search WyomingTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Wyoming is part of the WestConnect Transmission Planning area, and covers the southwest of the United States. Within the WestConnect system, Wyoming is part of the Colorado Coordinated Planning Group (CCPG) power grid that covers Colorado and portions of Wyoming.

482

Novel route to synthesize CuO nanoplatelets  

SciTech Connect

A new synthesis route to obtain high-purity cupric oxide, CuO, using the hydrothermal reaction of copper sulfide and a NaOH solution in an oxygen atmosphere has been developed. The synthesized products showed nanoplatelet-like morphologies with rectangular cross-sections and dimensions at the nanometric scale. Variations in the oxygen partial pressure and synthesis temperature produced changes in size and shape, being found that the proliferation of nanoplatelet structures occurred at 200 deg. C and 30 bar. - Graphical abstract: Transmission electron microscopy image of a CuO nanoplatelet. The inset is an electron diffraction pattern of this twined CuO nanoplatelet exhibiting a monoclinic crystal structure.

Zarate, R.A. [Departamento de Fisica, Facultad de Ciencias, Universidad Catolica del Norte, Casilla 1280, Antofagasta (Chile)], E-mail: rzarate@ucn.cl; Hevia, F. [Departamento de Quimica, Facultad de Ciencias, Universidad Catolica del Norte, Casilla 1280, Antofagasta (Chile); Fuentes, S. [Departamento de Fisica, Facultad de Ciencias, Universidad Catolica del Norte, Casilla 1280, Antofagasta (Chile); Fuenzalida, V.M. [Departamento de Fisica, Facultad de Ciencias Fisicas y Matematicas, Universidad de Chile, Av. Blanco Encalada 2008, Santiago (Chile); Zuniga, A. [Departamento de Ingenieria Mecanica, Facultad de Ciencias Fisicas y Matematicas, Universidad de Chile, Beauchef 850, Santiago (Chile)

2007-04-15T23:59:59.000Z

483

Proactive techniques for correct and predictable Internet routing  

E-Print Network (OSTI)

The Internet is composed of thousands of autonomous, competing networks that exchange reachability information using an interdomain routing protocol. Network operators must continually reconfigure the routing protocols to ...

Feamster, Nicholas G. (Nicholas Greer), 1979-

2006-01-01T23:59:59.000Z

484

DOE Office of Nuclear Energy Transportation Planning, Route Selection...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Nuclear Energy Transportation Planning, Route Selection, and Rail Issues DOE Office of Nuclear Energy Transportation Planning, Route Selection, and Rail Issues...

485