  1. Dynamic Power Flow Controller: Compact Dynamic Phase Angle Regulators for Transmission Power Routing

    SciTech Connect (OSTI)

    2012-01-03

    GENI Project: Varentec is developing compact, low-cost transmission power controllers with fractional power rating for controlling power flow on transmission networks. The technology will enhance grid operations through improved use of current assets and by dramatically reducing the number of transmission lines that have to be built to meet increasing contributions of renewable energy sources like wind and solar. The proposed transmission controllers would allow for the dynamic control of voltage and power flow, improving the grid’s ability to dispatch power in real time to the places where it is most needed. The controllers would work as fail-safe devices whereby the grid would be restored to its present operating state in the event of a controller malfunction instead of failing outright. The ability to affordably and dynamically control power flow with adequate fail-safe switchgear could open up new competitive energy markets which are not possible under the current regulatory structure and technology base.

  2. Power superconducting power transmission cable

    DOE Patents [OSTI]

    Ashworth, Stephen P.

    2003-01-01

    The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

  3. Power superconducting power transmission cable

    DOE Patents [OSTI]

    Ashworth, Stephen P.

    2003-06-10

    The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

  4. HVDC power transmission technology assessment

    SciTech Connect (OSTI)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D.; Johnson, B.K.; Stewart, J.R.; Fink, J.L.

    1997-04-01

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  5. Career Map: Power Systems/Transmission Engineer

    Broader source: Energy.gov [DOE]

    The Wind Program's Career Map provides job description information for Power Systems and Transmission Engineer positions.

  6. Distributed Power Flow Control: Distributed Power Flow Control using Smart Wires for Energy Routing

    SciTech Connect (OSTI)

    2012-04-24

    GENI Project: Smart Wire Grid is developing a solution for controlling power flow within the electric grid to better manage unused and overall transmission capacity. The 300,000 miles of high-voltage transmission line in the U.S. today are congested and inefficient, with only around 50% of all transmission capacity utilized at any given time. Increased consumer demand should be met in part with more efficient and an economical power flow. Smart Wire Grid’s devices clamp onto existing transmission lines and control the flow of power within—much like how internet routers help allocate bandwidth throughout the web. Smart wires could support greater use of renewable energy by providing more consistent control over how that energy is routed within the grid on a real-time basis. This would lessen the concerns surrounding the grid’s inability to effectively store intermittent energy from renewables for later use.

  7. 1993 Wholesale Power and Transmission Rate Schedules.

    SciTech Connect (OSTI)

    US Bonneville Power Administration

    1993-10-01

    Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

  8. Concurrent Wind Cooling in Power Transmission Lines

    SciTech Connect (OSTI)

    Jake P Gentle

    2012-08-01

    Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

  9. An Introduction to Electric Power Transmission | Open Energy...

    Open Energy Info (EERE)

    An Introduction to Electric Power Transmission Jump to: navigation, search OpenEI Reference LibraryAdd to library General: An Introduction to Electric Power Transmission Abstract...

  10. Power Flow Controller for Renewables: Transformer-less Unified Power Flow Controller for Wind and Solar Power Transmission

    SciTech Connect (OSTI)

    2012-02-08

    GENI Project: MSU is developing a power flow controller to improve the routing of electricity from renewable sources through existing power lines. The fast, innovative, and lightweight circuitry that MSU is incorporating into its controller will eliminate the need for a separate heavy and expensive transformer, as well as the construction of new transmission lines. MSU’s controller is better suited to control power flows from distributed and intermittent wind and solar power systems than traditional transformer-based controllers are, so it will help to integrate more renewable energy into the grid. MSU‘s power flow controller can be installed anywhere in the existing grid to optimize energy transmission and help reduce transmission congestion.

  11. J.S. 24 POWER TRANSMISSION AND DISTRIBUTION; VECTORS; ELECTRIC...

    Office of Scientific and Technical Information (OSTI)

    power and power factor of instantaneous phasors Hsu, J.S. 24 POWER TRANSMISSION AND DISTRIBUTION; VECTORS; ELECTRIC CURRENTS; ELECTRIC POTENTIAL; MONITORING; POWER SYSTEMS;...

  12. Termination for superconducting power transmission systems

    DOE Patents [OSTI]

    Forsyth, E.B.; Jensen, J.E.

    1975-08-26

    This patent relates to a cold, electrical gradient, terminal section for a superconducting cable for alternating current power transmission. A cold electrical gradient section filled with a gaseous coolant acting as an insulator is provided in series with a separate thermal gradient section. (auth)

  13. RAPID/BulkTransmission/Power Plant | Open Energy Information

    Open Energy Info (EERE)

    RAPIDBulkTransmissionPower Plant < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk...

  14. Wireless power transmission: The key to solar power satellites

    SciTech Connect (OSTI)

    Nansen, R.H.

    1995-12-31

    In the years following the OPEC oil embargo of 1973--74, the US aggressively researched alternative energy options. Among those studied was the concept of Solar Power Satellites -- generating electricity in space from solar energy on giant satellites and sending the energy to the earth with wireless power transmission. Much has happened in the fifteen years since the studies were terminated. Maturing of the enabling technologies has provided much of the infrastructure to support the development of a commercial Solar Power Satellite program. All of this will reduce the cost by one to two orders of magnitude so development can now be undertaken by industry instead of relying on a massive government program. Solar Space Industries was formed to accomplish this goal. The basis of their development plan for Solar Power Satellites is to build a Ground Test Installation that will duplicate, in small scale on the earth, all aspects of the power generating and power transmission systems for the Solar Power Satellite concept except for the space environment and the range and size of the energy beam. Space operations issues will be separated from the power generation function and verified by testing using the NASA Space Station and Space Shuttle. Solar Space Industries` concept is to built a Ground Test Installation that couples an existing 100 kW terrestrial solar cell array, furnished by an interested utility, to a phased-array wireless power transmitter based on the subarray developed by William Brown and The Center for Space Power. Power will be transmitted over a 1 1/4 mile range to a receiving antenna (rectenna) and then fed into a commercial utility power grid. The objective is to demonstrate the complete function of the Solar Power Satellites, with the primary issue being the validation of practical wireless power transmission. The key features to demonstrate are; beam control, stability, steering, efficiency, reliability, cost, and safety.

  15. EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4, ...

  16. NREL: Transmission Grid Integration - Solar Power Data for Integration...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power Data for Integration Studies The Solar Power Data for Integration Studies are synthetic ... 2006. The data are intended for use by energy professionals such as transmission ...

  17. Vehicle routing for the last mile of power system restoration

    SciTech Connect (OSTI)

    Bent, Russell W; Coffrin, Carleton; Van Hentenryck, Pascal

    2010-11-23

    This paper studied a novel problem in power system restoration: the Power Restoration Vehicle Routing Problem (PRVRP). The goal of PRVRPs is to decide how coordinate repair crews effectively in order to recover from blackouts as fast as possible after a disaster has occurred. PRVRPs are complex problems that combine vehicle routing and power restoration scheduling problems. The paper proposed a multi-stage optimization algorithm based on the idea of constraint injection that meets the aggressive runtime constraints necessary for disaster recovery. The algorithms were validated on benchmarks produced by the Los Alamos National Laboratory, using the infrastructure of the United States. The disaster scenarios were generated by state-of-the-art hurricane simulation tools similar to those used by the National Hurricane Center. Experimental results show that the constraint-injection algorithms can reduce the blackouts by 50% or more over field practices. Moreover, the results show that the constraint-injection algorithm using large neighborhood search over a blackbox simulator provide competitive quality and scales better than using a MIP solver on the subproblems.

  18. Green Power Transmission Line Given New Life | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Transmission Line Given New Life Green Power Transmission Line Given New Life March 11, 2010 - 4:34pm Addthis Poles for the Montana-Alberta Tie Line are unloaded outside Shelby, Mont. | Photo courtesy of Tonbridge Power Poles for the Montana-Alberta Tie Line are unloaded outside Shelby, Mont. | Photo courtesy of Tonbridge Power Stephen Graff Former Writer & editor for Energy Empowers, EERE Thanks to funds from the American Recovery and Reinvestment Act, construction of a green power

  19. Final EIS for Champlain Hudson Power Express Transmission Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project CEQ Releases Two Handbooks on Improving Efficiency of Federal ...

  20. Wind Concurrent Cooling Could Increase Power Transmission Potential...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Concurrent Cooling Could Increase Power Transmission Potential by as Much as 40% Wind ... In areas where wind farms are being developed, there is potential to take advantage of ...

  1. HEADLINE: BPA RAISES RATES TO BOLSTER FEDERAL POWER AND TRANSMISSION...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    high-voltage transmission lines that serve Northwest public utilities." For Bonneville's utility power customers, the wholesale rate increase will be an average of 9 percent...

  2. NREL: Transmission Grid Integration - Active Power Controls

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Active Power Controls NREL has teamed with a number of organizations, including the Electric Power Research Institute and the University of Colorado, to research the potential of wind power plants to provide active power control (also known as real power or frequency control) to the electric power system. Released January 2014 Active Power Controls from Wind Power: Bridging the Gaps Project study report explores how wind power can support power system reliability, and do so economically with

  3. Apparatus and method for routing a transmission line through a downhole tool

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David S.; Briscoe, Michael; Reynolds, Jay

    2006-07-04

    A method for routing a transmission line through a tool joint having a primary and secondary shoulder, a central bore, and a longitudinal axis, includes drilling a straight channel, at a positive, nominal angle with respect to the longitudinal axis, through the tool joint from the secondary shoulder to a point proximate the inside wall of the centtral bore. The method further includes milling back, from within the central bore, a second channel to merge with the straight channel, thereby forming a continuous channel from the secondary shoulder to the central bore. In selected embodiments, drilling is accomplished by gun-drilling the straight channel. In other embodiments, the method includes tilting the tool joint before drilling to produce the positive, nominal angle. In selected embodiments, the positive, nominal angle is less than or equal to 15 degrees.

  4. Ecological benefits of dc power transmission

    SciTech Connect (OSTI)

    Kutuzova, N. B.

    2011-05-15

    The environmental effects of dc overhead transmission lines are examined. The major effects of ac and dc transmission lines are compared. Dc lines have advantages compared to ac lines in terms of electrical safety for people under the lines, biological effects, corona losses, and clearance width.

  5. Directional Reactive Power Ground Plane Transmission - Energy...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Marketing SummaryORNL researchers have developed a pioneering power alternative to batteries using directional reactive power. Batteries are currently the primary option for...

  6. Final environmental impact statement, Washington Water Power/B.C. Hydro Transmission Interconnection Project

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    Washington Water Power (WWP) proposes to construct and operate an electric transmission line that would connect with the electrical system of the British Columbia Hydro and Power Authority (B.C. Hydro). The project would be composed of a double-circuit, 230-kilovolt (kV) transmission line from WWP`s existing Beacon Substation located northeast of Spokane, Washington to the international border located northwest of Metaline Falls, Washington. The original Presidential permit application and associated proposed route presented in the draft environmental impact statement (DEIS) have been modified to terminate at the Beacon Substation, instead of WWP`s initially proposed termination point at the planned Marshall Substation located southwest of Spokane. A supplemental draft EIS was prepared and submitted for review to not only examine the new proposed 5.6 miles of route, but to also compare the new Proposed Route to the other alternatives previously analyzed in the DEIS. This final EIS (FEIS) assesses the environmental effects of the proposed transmission line through construction, operation, maintenance, and abandonment activities and addresses the impacts associated with the Proposed Action, Eastern Alternative, Western Alternative, Northern Crossover Alternative, Southern Crossover Alternative, and No Action Alternative. The FEIS also contains the comments received and the responses to these comments submitted on the DEIS and Supplemental DEIS.

  7. Applications for space power by laser transmission

    SciTech Connect (OSTI)

    Landis, G.A.

    1994-12-31

    A new method for providing power to space consists of using high-power CW lasers on the ground to beam power to photovoltaic receivers in space. Such large lasers could be located at cloud-free sites at one or more ground locations, and use large mirrors with adaptive optical correction to reduce the beam spread due to diffraction or atmospheric turbulence. This can result in lower requirements for battery storage, due to continuous illumination of arrays even during periods of shadow by the Earth, and higher power output, due to the higher efficiency of photovoltaic arrays under laser illumination compared to solar and the ability to achieve higher intensities of illumination. Applications include providing power for satellites during eclipse, providing power to resurrect satellites which are failing due to solar array degradation, powering orbital transfer vehicles or lunar transfer shuttles, and providing night power to a solar array on the moon.

  8. TRANSMISSION AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED...

    Office of Scientific and Technical Information (OSTI)

    AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED COST; CALCULATION METHODS; PLANNING; COST ESTIMATION; MATHEMATICAL MODELS The displacement or deferral of substation...

  9. Western Area Power Administration Transmission Infrastructure Program

    Energy Savers [EERE]

    Department of Energy Western Area Power Administration Borrowing Authority, Recovery Act Western Area Power Administration Borrowing Authority, Recovery Act PDF icon Microsoft Word - PSRP May 15 2009 _WAPA Borrowing Authority_ Final.docx More Documents & Publications WAPA Recovery Act Implementation Appropriation Microsoft Word - PSRP Updates 6-25-10_v2 Bonneville Power Administration Program Specific Recovery Plan

    TIP Program Overview Craig Knoell, Program Manager November 2009 TIP

  10. EIS-0377: Big Stone II Power Plant and Transmission Project

    Broader source: Energy.gov [DOE]

    A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission...

  11. DC power transmission from the Leningradskaya Nuclear Power Plant to Vyborg

    SciTech Connect (OSTI)

    Koshcheev, L. A.; Shul'ginov, N. G.

    2011-05-15

    DC power transmission from the Leningradskaya Nuclear Power Plant (LAES) to city of Vyborg is proposed. This will provide a comprehensive solution to several important problems in the development and control of the unified power system (EES) of Russia.

  12. Pulse transmission transceiver architecture for low power communications

    DOE Patents [OSTI]

    Dress, Jr., William B.; Smith, Stephen F.

    2003-08-05

    Systems and methods for pulse-transmission low-power communication modes are disclosed. A method of pulse transmission communications includes: generating a modulated pulse signal waveform; transforming said modulated pulse signal waveform into at least one higher-order derivative waveform; and transmitting said at least one higher-order derivative waveform as an emitted pulse. The systems and methods significantly reduce lower-frequency emissions from pulse transmission spread-spectrum communication modes, which reduces potentially harmful interference to existing radio frequency services and users and also simultaneously permit transmission of multiple data bits by utilizing specific pulse shapes.

  13. Princeton Power Systems (TRL 5 6 Component)- Marine High-Voltage Power Conditioning and Transmission System with Integrated Energy Storage

    Broader source: Energy.gov [DOE]

    Princeton Power Systems (TRL 5 6 Component) - Marine High-Voltage Power Conditioning and Transmission System with Integrated Energy Storage

  14. HVDC power transmission electrode siting and design

    SciTech Connect (OSTI)

    Holt, R.J. [NDT Engineering, Inc., Shrewbury, MA (United States); Dabkowski, J. [Electro-Sciences, Inc., Crystal Lake, IL (United States); Hauth, R.L. [New England Power Service Co., Westborough, MA (United States)

    1997-04-01

    This research strives to shed light on the feasibility and practicality of using deep earth electrodes to permit their use for extended periods without adverse consequences. This report begins with a review of the fundamentals associated with current conduction in earth, including the various techniques available for measuring the earth`s electrical properties. The sources of existing data are discussed and some specific data for selected regions of the U.S. and Canada are reviewed as examples. Electrode technology and design issues are reviewed and recent experience gained by New England Power and Hydro-Quebec is discussed. The issues associated with direct current flowing in underground pipelines (and other facilities) are described and the present-day mitigation measures are evaluated. Suggestions are made for further R&D in the coordination of cathodic protection systems, an area that has evolved as an empirical, trial- and-error art more than a science.

  15. Transmission

    Energy Savers [EERE]

    ~ Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of

  16. High-Power Microwave Transmission and Mode Conversion Program

    SciTech Connect (OSTI)

    Vernon, Ronald J.

    2015-08-14

    This is a final technical report for a long term project to develop improved designs and design tools for the microwave hardware and components associated with the DOE Plasma Fusion Program. We have developed basic theory, software, fabrication techniques, and low-power measurement techniques for the design of microwave hardware associated gyrotrons, microwave mode converters and high-power microwave transmission lines. Specifically, in this report we discuss our work on designing quasi-optical mode converters for single and multiple frequencies, a new method for the analysis of perturbed-wall waveguide mode converters, perturbed-wall launcher design for TE0n mode gyrotrons, quasi-optical traveling-wave resonator design for high-power testing of microwave components, and possible improvements to the HSX microwave transmission line.

  17. Electric power transmission for a Hanford Nuclear Energy Center (HNEC)

    SciTech Connect (OSTI)

    Harty, H.; Dowis, W.J.

    1983-06-01

    The original study of transmission for a Hanford Nuclear Energy Center (HNEC), which was completed in September 1975, was updated in June 1978. The present 1983 revision takes cognizance of recent changes in the electric power situation of the PNW with respect to: (1) forecasts of load growth, (2) the feasibility of early use of 1100 kV transmission, and (3) the narrowing opportunities for siting nuclear plants in the region. The purpose of this update is to explore and describe additions to the existing transmission system that would be necessary to accommodate three levels of generation at HNEC. Comparisons with a PNW system having new thermal generating capacity distributed throughout the marketing region are not made as was done in earlier versions.

  18. Cryogenic System for a High Temperature Superconducting Power Transmission Cable

    SciTech Connect (OSTI)

    Demko, J.A.; Gouge, M.J.; Hughey, R.L.; Lue, J.W.; Martin, R.; Sinha, U.; Stovall, J.P.

    1999-07-12

    High-temperature superconducting (HTS) cable systems for power transmission are under development that will use pressurized liquid nitrogen to provide cooling of the cable and termination hardware. Southwire Company and Oak Ridge National Laboratory have been operating a prototype HTS cable system that contains many of the typical components needed for a commercial power transmission application. It is being used to conduct research in the development of components and systems for eventual commercial deployment. The cryogenic system was built by Air Products and Chemicals, Allentown, Pennsylvania, and can circulate up to 0.35 kg/s of liquid nitrogen at temperatures as low as 67 K at pressures of 1 to 10 bars. Sufficient cooling is provided for testing a 5-m-long HTS transmission cable system that includes the terminations required for room temperature electrical connections. Testing of the 5-m HTS transmission cable has been conducted at the design ac conditions of 1250 A and 7.5 kV line to ground. This paper contains a description of the essential features of the HTS cable cryogenic system and performance results obtained during operation of the system. The salient features of the operation that are important in large commercial HTS cable applications will be discussed.

  19. EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

  20. Central Wind Power Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities

    SciTech Connect (OSTI)

    Porter, K.; Rogers, J.

    2009-12-01

    The report addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America.

  1. BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-08-01

    Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

  2. EIS-0173: Bonneville Power Administration/Puget Power Northwest Washington Transmission Project

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) prepared this environmental impact statement to analyze the environmental impacts of an upgrade that BPA and Puget Sound Power & Light Company are considering implementing on the existing high-voltage transmission system in the Whatcom and Skagit Counties area of the State of Washington, between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995.

  3. Ultra high performance connectors for power transmission applications

    DOE Patents [OSTI]

    Wang, Jy-An; Ren, Fei; Lee, Dominic F; Jiang, Hao

    2014-03-04

    Disclosed are several examples of an apparatus for connecting the free ends of two electrical power transmission lines having conductor strands disposed around a central, reinforcing core. The examples include an inner sleeve having a body defining an inner bore passing through an axially-extending, central axis, an outer rim surface disposed radially outward from the central bore, and one or more axially-extending grooves penetrating the body at the outer rim surface. Also included is an outer splice having a tubular shaped body with a bore passing coaxially through the central axis, the bore defining an inner rim surface for accepting the inner sleeve. The inner bore of the inner sleeve accepts the reinforcement cores of the two conductors, and the grooves accept the conductor strands in an overlapping configuration so that a majority of the electrical current flows between the overlapped conductor strands when the conductors are transmitting electrical current.

  4. Wind Concurrent Cooling Could Increase Power Transmission Potential by as Much as 40%

    Broader source: Energy.gov [DOE]

    Researchers at DOE’s Idaho National Laboratory are working with industry to model wind’s cooling effects on power transmission lines to dynamically couple transmission systems with concurrent cooling processes.

  5. Renewable Energy and Inter-Island Power Transmission (Presentation)

    SciTech Connect (OSTI)

    Gevorgian, V.

    2011-05-01

    This presentation summarizes recent findings pertaining to inter-island connection of renewable and other energy sources, in particular, as these findings relate cable options, routing, specifications, and pros and cons.

  6. EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland

    Energy Savers [EERE]

    and Delaware | Department of Energy 5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4, 2011 EIS-0465: Notice of Intent to Prepare an Environmental Impact Statement Construction of Phase II of the Mid-Atlantic Power Pathway Transmission Line Project, in Maryland and Delaware February 4, 2011 EIS-0465: Announcement of Public Scoping Meetings Construction of Phase II of

  7. Trends In U.S. Electric Power Transmission

    SciTech Connect (OSTI)

    NONE

    2007-11-15

    The report provides an overview of the changes that are occurring in the industry to implement the goals of improved reliability and reduced congestion costs. As the electric industry works to become a more efficient market, transmission stands as a key link between the competitive generation and the regulated distribution sectors. In this role as a key link, transmission is a major focus of government efforts to improve reliability and reduce congestion costs. The scope of the report is to analyze the dominant reliability, investment, siting, and competition/open access trends that are occurring in the domestic electric transmission industry. Topics covered include: the impact of the 2003 Northeast blackout on reliability rules; the move from voluntary to mandatory reliability standards; the advent of real-time transmission system monitoring; ISO/RTO efforts to improve system reliability; the drivers of government intervention in transmission investment; the move towards incentive-based rates for transmission investment; legislative and regulatory efforts to spur transmission investment to support renewable energy resources; the emergence of merchant transmission; the need for federal backstop authority on regional transmission projects; the designation of national interest electric transmission corridors; FERC Orders on siting transmission; the need for changes in open access and competition regulations; FERC efforts to increase open access and competition; legislative efforts to increase competition; and, current competitive issues in the industry.

  8. Low loss conductor for ac or dc power transmission

    DOE Patents [OSTI]

    Sampson, W.B.; Garber, M.

    1973-03-13

    The patent describes a compact, easy to fabricate, noninductive, low surface magnetic field superconductor transmission line that has minimal stray fields.

  9. Low Loss Conductor for AC or DC Power Transmission

    DOE Patents [OSTI]

    Sampson, W. B.; Garber, M.

    1973-03-13

    The patent describes a compact, easy to fabricate, noninductive, low surface magnetic field superconductor transmission line that has minimal stray fields.

  10. Administrator's Final Record of Decision, BP-14 Power and Transmission...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    understanding of specific topics, generate ideas, and bring forward alternative proposals. The workshops placed significant emphasis on transmission and ancillary and control...

  11. The integration of renewable energy sources into electric power transmission systems

    SciTech Connect (OSTI)

    Barnes, P.R.; Dykas, W.P.; Kirby, B.J.; Purucker, S.L.; Lawler, J.S.

    1995-07-01

    Renewable energy technologies such as photovoltaics, solar thermal power plants, and wind turbines are nonconventional, environmentally attractive sources of energy that can be considered for electric power generation. Many of the areas with abundant renewable energy resources (very sunny or windy areas) are far removed from major load centers. Although electrical power can be transmitted over long distances of many hundreds of miles through high-voltage transmission lines, power transmission systems often operate near their limits with little excess capacity for new generation sources. This study assesses the available capacity of transmission systems in designated abundant renewable energy resource regions and identifies the requirements for high-capacity plant integration in selected cases. In general, about 50 MW of power from renewable sources can be integrated into existing transmission systems to supply local loads without transmission upgrades beyond the construction of a substation to connect to the grid. Except in the Southwest, significant investment to strengthen transmission systems will be required to support the development of high-capacity renewable sources of 1000 MW or greater in areas remote from major load centers. Cost estimates for new transmission facilities to integrate and dispatch some of these high-capacity renewable sources ranged from several million dollars to approximately one billion dollars, with the latter figure an increase in total investment of 35%, assuming that the renewable source is the only user of the transmission facility.

  12. NREL: Transmission Grid Integration - NREL Power Systems Engineering

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Researchers Publish 33 Articles in Last Year Power Systems Engineering Researchers Publish 33 Articles in Last Year February 18, 2016 NREL's Power Systems Engineering Center published 33 journal and magazine articles in the past year highlighting recent research in integrating renewable energy into power systems. NREL would like to acknowledge the U.S. Department of Energy for the funding support that made this research possible. Integrated Devices and Systems Research Lab Tests: Verifying

  13. Chapter 3: Enabling Modernization of the Electric Power System Technology Assessment | Transmission and Distribution Components

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Enabling Modernization of the Electric Power System Technology Assessments Cyber and Physical Security Designs, Architectures, and Concepts Electric Energy Storage Flexible and Distributed Energy Resources Measurements, Communications, and Controls Transmission and Distribution Components ENERGY U.S. DEPARTMENT OF Quadrennial Technology Review 2015 1 Quadrennial Technology Review 2015 Transmission and Distribution Components Chapter 3: Technology Assessments Introduction Today's electric

  14. EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York

    Broader source: Energy.gov [DOE]

    This EIS evaluated the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City.

  15. THURSDAY: Deputy Secretary of Energy to Visit Western Area Power Administration Transmission Substation

    Broader source: Energy.gov [DOE]

    Deputy Secretary of Energy Elizabeth Sherwood-Randall will visit the Western Area Power Administration for a ceremony at the Electrical District No. 5 Substation to view progress on the Electrical District 5-to-Palo Verde transmission project.

  16. EIS-0097: Bonneville Power Administration Transmission Facilities Vegetation Management Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Bonneville Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with implementing a vegetation management program.

  17. Electrical Collection and Transmission Systems for Offshore Wind Power: Preprint

    SciTech Connect (OSTI)

    Green, J.; Bowen, A.; Fingersh, L.J.; Wan, Y.

    2007-03-01

    The electrical systems needed for offshore wind farms to collect power from wind turbines--and transmit it to shore--will be a significant cost element of these systems. This paper describes the development of a simplified model of the cost and performance of such systems.

  18. Diné Power Authority - Navajo Transmission Project and other...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting Denver, CO PA D D I N E ' P O W E R A U T H O R I T Y DPA Overview * Din Power ... Segment 2: 62 miles, crossing 23.66 miles of Bennett Freeze area & 0.44 miles of Navajo ...

  19. EIS-0141: Washington Water Power/B.C. Hydro Transmission Interconnection Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the environmental impacts of constructing and operating a double-circuit 230-kilovolt electrical transmission line that would link the electrical systems of the Washington Water Power Company and the British Columbia Hydro and Power Authority.

  20. Transmission Benefits of Co-Locating Concentrating Solar Power and Wind

    SciTech Connect (OSTI)

    Sioshansi, R.; Denholm, P.

    2012-03-01

    In some areas of the U.S. transmission constraints are a limiting factor in deploying new wind and concentrating solar power (CSP) plants. Texas is an example of one such location, where the best wind and solar resources are in the western part of the state, while major demand centers are in the east. The low capacity factor of wind is a compounding factor, increasing the relative cost of new transmission per unit of energy actually delivered. A possible method of increasing the utilization of new transmission is to co-locate both wind and concentrating solar power with thermal energy storage. In this work we examine the benefits and limits of using the dispatachability of thermal storage to increase the capacity factor of new transmission developed to access high quality solar and wind resources in remote locations.

  1. Hybrid powertrain system including smooth shifting automated transmission

    DOE Patents [OSTI]

    Beaty, Kevin D.; Nellums, Richard A.

    2006-10-24

    A powertrain system is provided that includes a prime mover and a change-gear transmission having an input, at least two gear ratios, and an output. The powertrain system also includes a power shunt configured to route power applied to the transmission by one of the input and the output to the other one of the input and the output. A transmission system and a method for facilitating shifting of a transmission system are also provided.

  2. Control system and method for a power delivery system having a continuously variable ratio transmission

    DOE Patents [OSTI]

    Frank, A.A.

    1984-07-10

    A control system and method for a power delivery system, such as in an automotive vehicle, having an engine coupled to a continuously variable ratio transmission (CVT). Totally independent control of engine and transmission enable the engine to precisely follow a desired operating characteristic, such as the ideal operating line for minimum fuel consumption. CVT ratio is controlled as a function of commanded power or torque and measured load, while engine fuel requirements (e.g., throttle position) are strictly a function of measured engine speed. Fuel requirements are therefore precisely adjusted in accordance with the ideal characteristic for any load placed on the engine. 4 figs.

  3. Control system and method for a power delivery system having a continuously variable ratio transmission

    DOE Patents [OSTI]

    Frank, Andrew A.

    1984-01-01

    A control system and method for a power delivery system, such as in an automotive vehicle, having an engine coupled to a continuously variable ratio transmission (CVT). Totally independent control of engine and transmission enable the engine to precisely follow a desired operating characteristic, such as the ideal operating line for minimum fuel consumption. CVT ratio is controlled as a function of commanded power or torque and measured load, while engine fuel requirements (e.g., throttle position) are strictly a function of measured engine speed. Fuel requirements are therefore precisely adjusted in accordance with the ideal characteristic for any load placed on the engine.

  4. Marine High Voltage Power Conditioning and Transmission System with Integrated Storage DE-EE0003640 Final Report

    SciTech Connect (OSTI)

    Frank Hoffmann, PhD; Aspinall, Rik

    2012-12-10

    Design, Development, and test of the three-port power converter for marine hydrokinetic power transmission. Converter provides ports for AC/DC conversion of hydrokinetic power, battery storage, and a low voltage to high voltage DC port for HVDC transmission to shore. The report covers the design, development, implementation, and testing of a prototype built by PPS.

  5. Magnet Lattice Design for the Transmission of Power Using Particle Beams

    SciTech Connect (OSTI)

    Marley, Daniel; /North Carolina State U. /SLAC

    2012-08-24

    As the amount of electricity generated by renewable energy sources continues to increase, the current method of power transmission will not serve as an adequate method for transmitting power over very long distances. A new method for transmitting power is proposed using particle beams in a storage ring. Particle beams offer an incredibly energy efficient alternative to transmission lines in transmitting power over very long distances. A thorough investigation of the magnet lattice design for this storage ring is presented. The design demonstrates the ability to design a ring with stable orbits over a 381.733 km circumference. Double bend achromats and FODO cells are implemented to achieve appropriate {beta} functions and dispersion functions for 9-11 GeV electron beams.

  6. Method To Monitor Nuclear Power Plant Risk from Transmission Grid Conditions

    SciTech Connect (OSTI)

    B. Gregg; K Canavan

    2004-10-30

    This report examines a method to monitor and trend the transmission grid in the local vicinity of a nuclear o other generating station. The method addresses the potential for a loss of off-site power following a plant trip or a loss-of-coolant accident.

  7. Bias-field controlled phasing and power combination of gyromagnetic nonlinear transmission lines

    SciTech Connect (OSTI)

    Reale, D. V. Bragg, J.-W. B.; Gonsalves, N. R.; Johnson, J. M.; Neuber, A. A.; Dickens, J. C.; Mankowski, J. J.

    2014-05-15

    Gyromagnetic Nonlinear Transmission Lines (NLTLs) generate microwaves through the damped gyromagnetic precession of the magnetic moments in ferrimagnetic material, and are thus utilized as compact, solid-state, frequency agile, high power microwave (HPM) sources. The output frequency of a NLTL can be adjusted by control of the externally applied bias field and incident voltage pulse without physical alteration to the structure of the device. This property provides a frequency tuning capability not seen in many conventional e-beam based HPM sources. The NLTLs developed and tested are mesoband sources capable of generating MW power levels in the L, S, and C bands of the microwave spectrum. For an individual NLTL the output power at a given frequency is determined by several factors including the intrinsic properties of the ferrimagnetic material and the transmission line structure. Hence, if higher power levels are to be achieved, it is necessary to combine the outputs of multiple NLTLs. This can be accomplished in free space using antennas or in a transmission line via a power combiner. Using a bias-field controlled delay, a transient, high voltage, coaxial, three port, power combiner was designed and tested. Experimental results are compared with the results of a transient COMSOL simulation to evaluate combiner performance.

  8. System for routing messages in a vertex symmetric network by using addresses formed from permutations of the transmission line indicees

    DOE Patents [OSTI]

    Faber, Vance; Moore, James W.

    1992-01-01

    A network of interconnected processors is formed from a vertex symmetric graph selected from graphs .GAMMA..sub.d (k) with degree d, diameter k, and (d+1)!/(d-k+1)! processors for each d.gtoreq.k and .GAMMA..sub.d (k,-1) with degree 3-1, diameter k+1, and (d+1)!/(d-k+1)! processors for each d.gtoreq.k.gtoreq.4. Each processor has an address formed by one of the permutations from a predetermined sequence of letters chosen a selected number of letters at a time, and an extended address formed by appending to the address the remaining ones of the predetermined sequence of letters. A plurality of transmission channels is provided from each of the processors, where each processor has one less channel than the selected number of letters forming the sequence. Where a network .GAMMA..sub.d (k,-1) is provided, no processor has a channel connected to form an edge in a direction .delta..sub.1. Each of the channels has an identification number selected from the sequence of letters and connected from a first processor having a first extended address to a second processor having a second address formed from a second extended address defined by moving to the front of the first extended address the letter found in the position within the first extended address defined by the channel identification number. The second address is then formed by selecting the first elements of the second extended address corresponding to the selected number used to form the address permutations.

  9. The development of a subsea power transmission system for deep water boosting applications

    SciTech Connect (OSTI)

    Godinho, C.A.; Campagnac, L.A.; Nicholson, A.; Magalhaes, W.M.

    1996-12-31

    This paper presents the development of a subsea power transmission in medium voltage and variable frequency, as a key system for application of Boosting Technology and, more particularly, for Electrical Submersible Pumping in deep water wells. The focuses of this paper are mainly on the design and manufacture of subsea power cables and transformers for 1,000 m water depth. The production from a subsea well equipped with ESP`s is a fact since October/94, with the first installation in the Campos Basin, Brazil. The development of the subsea power transmission in medium voltage and variable frequency will allow the installation of a Boosting System in deep water at long distance (25 km or more) from the production platform. The design and manufacture of subsea power cables and subsea power transformers, as well as the integration of the complete power system is a result of a Technological Cooperation Agreement with Tronic, Pirelli, Siemens A.G. and Siemens Brazil. As a result from this agreement subsea power cables up to 12/20 kV voltage level, conductor sizes from 35 to 150 mm{sup 2}, oil filled subsea power transformer rated at 750 kVA, nominal voltage ratio 10,000/3,000 V and the electrical connectors to X-tree will be developed and manufactured.

  10. ANUEADflM-31 Electric Power High-Voltage Transmission Lines:

    Office of Scientific and Technical Information (OSTI)

    ANUEADflM-31 Electric Power High-Voltage Transmission Lines: Design Options, Cost, and Electric and Magnetic Field Levels by J.B. Stoffel,' E.D. Pentecost, R.D. Roman, and P.A. Traczyk Environmental Assessment Division, Argonne National Laboratory, 9700 South Cass Avenue, Argonne, Illinois 60439 November 1994 Work sponsored by United States Department of Energy, Assistant Secretary for Fossil Energy, Office of Fuels Program Stoffel is affiliated with Argonne's Electronics and Computing

  11. Termination for a superconducting power transmission line including a horizontal cryogenic bushing

    DOE Patents [OSTI]

    Minati, Kurt F.; Morgan, Gerry H.; McNerney, Andrew J.; Schauer, Felix

    1984-01-01

    A termination for a superconducting power transmission line is disclosed which is comprised of a standard air entrance insulated vertical bushing with an elbow, a horizontal cryogenic bushing linking the pressurized cryogenic cable environment to the ambient temperature bushing and a stress cone which terminates the cable outer shield and transforms the large radial voltage gradient in the cable dielectric into a much lower radial voltage gradient in the high density helium coolant at the cold end of the cryogenic bushing.

  12. Horizontal cryogenic bushing for the termination of a superconducting power-transmission line

    DOE Patents [OSTI]

    Minati, K.F.; Morgan, G.H.; McNerney, A.J.; Schauer, F.

    1982-07-29

    A termination for a superconducting power transmission line is disclosed which is comprised of a standard air entrance insulated vertical bushing with an elbow, a horizontal cryogenic bushing linking the pressurized cryogenic cable environment to the ambient temperature bushing and a stress cone which terminated the cable outer shield and transforms the large radial voltage gradient in the cable dielectric into a much lower radial voltage gradient in the high density helium coolant at the cold end of the cryogenic bushing.

  13. Renewable Electricity Futures Study Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning

    Broader source: Energy.gov [DOE]

    This volume focuses on the role of variable renewable generation in creating challenges to the planning and operations of power systems and the expansion of transmission to deliver electricity from remote resources to load centers. The technical and institutional changes to power systems that respond to these challenges are, in many cases, underway, driven by the economic benefits of adopting more modern communication, information, and computation technologies that offer significant operational cost savings and improved asset utilization. While this volume provides background information and numerous references, the reader is referred to the literature for more complete tutorials.

  14. EIS-0078: Jonesboro-Hergett 161-kV Transmission Line

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Southwestern Power Administration developed this statement to assess the environmental and socioeconomic impacts of a 161-kilovolt transmission line in Craighead County, Arkansas, including its proposed and alternate routes.

  15. Energy harvesting and wireless energy transmission for powering SHM sensor nodes

    SciTech Connect (OSTI)

    Taylor, Stuart G; Farinholt, Kevin M; Park, Gyuhae; Farrar, Charles R

    2009-01-01

    In this paper, we present a feasibility study of using energy harvesting and wireless energy transmission systems to operate SHM sensor nodes. The energy harvesting approach examines the use of kinetic energy harvesters to scavenge energy from the ambient sources. Acceleration measurements were made on a bridge, and serve as the basis for a series of laboratory experiments that replicate these sources using an electromagnetic shaker. We also investigated the use of wireless energy transmission systems to operate SHM sensor nodes. The goal of this investigation is to develop SHM sensing systems which can be permanently embedded in the host structure and do not require on-board power sources. This paper summarizes considerations needed to design such systems, experimental procedures and results, and additional issues that can be used as guidelines for future investigations.

  16. Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-08-27

    Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or conductors, and two neutral ground wires that would provide both lightning protection and fiber optic communications, on a single set of support structures. The transmission line would originate at TEP's existing South Substation (which TEP would expand), in the vicinity of Sahuarita, Arizona, and interconnect with the Citizens Communications (Citizens) system at a Gateway Substation that TEP would construct west of Nogales, Arizona. The double-circuit transmission line would continue from the Gateway Substation south to cross the U.S.-Mexico border and extend approximately 60 miles (mi) (98 kilometers [km]) into the Sonoran region of Mexico, connecting with the Comision Federal de Electricidad (CFE, the national electric utility of Mexico) at CFE's Santa Ana Substation.

  17. Sandia Energy - Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Grid Integration Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Grid Integration Transmission Grid Integration Transmission Grid...

  18. High power microwave beam steering based on gyromagnetic nonlinear transmission lines

    SciTech Connect (OSTI)

    Romanchenko, I. V. Rostov, V. V.; Gunin, A. V.; Konev, V. Yu.

    2015-06-07

    We demonstrate electronically controlled beam steering by high power RF pulses produced by two gyromagnetic nonlinear transmission lines (NLTLs) connected to a one high voltage driver. Each NLTL is capable of producing several ns RF pulses with peak power from 50 to 700 MW (6% standard deviation) at frequencies from 0.5 to 1.7 GHz (1% standard deviation) with 100 Hz repetition rate. Using a helix antenna allows irradiating of RF pulses with almost circular polarization and 350 MW maximum peak power, which corresponds to 350 kV effective potential of radiation. At the installation of two identical channels, we demonstrate the possibility of beam steering within ±15° in the horizontal plane by coherent RF pulses with circular polarization at 1.0 GHz center frequency. Fourfold increase in the power flux density for in-phase irradiation of RF pulses is confirmed by comparison with one-channel operation.

  19. Laboratory Shuttle Bus Routes: Combined Routes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Combined Routes & Schedules Blue Route Orange Route Rockridge Route Potter St.JBEI Route Combined Routes and Schedules (On-SiteOff-Site) Scroll down or click here for schedule...

  20. Co-optimizing Generation and Transmission Expansion with Wind Power in Large-Scale Power Grids Implementation in the US Eastern Interconnection

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    You, Shutang; Hadley, Stanton W.; Shankar, Mallikarjun; Liu, Yilu

    2016-01-12

    This paper studies the generation and transmission expansion co-optimization problem with a high wind power penetration rate in the US Eastern Interconnection (EI) power grid. In this paper, the generation and transmission expansion problem for the EI system is modeled as a mixed-integer programming (MIP) problem. Our paper also analyzed a time series generation method to capture the variation and correlation of both load and wind power across regions. The obtained series can be easily introduced into the expansion planning problem and then solved through existing MIP solvers. Simulation results show that the proposed planning model and series generation methodmore » can improve the expansion result significantly through modeling more detailed information of wind and load variation among regions in the US EI system. Moreover, the improved expansion plan that combines generation and transmission will aid system planners and policy makers to maximize the social welfare in large-scale power grids.« less

  1. Overhead electric power transmission line jumpering system for bundles of five or more subconductors

    DOE Patents [OSTI]

    Winkelman, Paul F.

    1982-01-01

    Jumpering of electric power transmission lines at a dead end tower. Two transmission line conductor bundles each contain five or more spaced apart subconductors (5) arranged in the shape of a cylinder having a circular cross section. The ends of each bundle of subconductors are attached with insulators to a dead end tower (1). Jumpering allows the electric current to flow between the two bundles of subconductors using jumper buses, internal jumper conductors, and external jumper conductors. One or more current collecting jumper buses (37) are located inside each bundle of subconductors with each jumper bus being attached to the end of a subconductor. Small-diameter internal jumper conductors (33) are located in the inherently electrically shielded area inside each bundle of subconductors with each subconductor (except ones having an attached jumper bus) having one internal jumper conductor connected between that subconductor's end and a jumper bus. Large-diameter external jumper conductors (9) are located outside each bundle of subconductors with one or more external jumper conductors being connected between the jumper buses in one bundle of subconductors and the jumper buses in the other bundle.

  2. Amended Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line: Federal Register Notice, Volume 79, No. 222- Nov. 18, 2014

    Broader source: Energy.gov [DOE]

    Minnesota Power, Great Northern Transmission Line has submitted an amended application for a Presidential Permit to construct, operate, maintain and connect an electric transmission line across the United States border with Canada.

  3. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  4. Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line

    Broader source: Energy.gov [DOE]

    State Department Response on the GNTL application to construct, operate, and maintain electric transmission facilities at the U.S. - Canada border.

  5. Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line

    Broader source: Energy.gov [DOE]

    Response letter for GNTL from Department of Defense to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border.

  6. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management approach that fosters low-growing plant communities.

  7. ANUEADflM-31 Electric Power High-Voltage Transmission Lines:

    Office of Scientific and Technical Information (OSTI)

    ... design options to reduce human exposure to EMFs from high-voltage transmission lines. ... assumed for the 345-kV designs: 150-R rights-of-way for overhead lines, 50-ft ...

  8. Heavy duty insulator assemblies for 500-kV bulk power transmission line with large diameter octagonalbundled conductor

    SciTech Connect (OSTI)

    Tsujimoto, K.; Hayase, I.; Hirai, J.; Inove, M.; Naito, K.; Yukino, T.

    1982-11-01

    This paper describes the design procedure and the results of field tests on mechanical performances of insulator assemblies newly developed to support octagonal-bundled conductors for 500-kV bulk power transmission. Taking account of conductor-motion-induced peak tensile load, fatigue, torsional torque and others, a successful design has been achieved in two prototype assemblies for such heavy mechanical duties as encountered during conductor galloping or swing. This has been proved throughout three years of the field tests.

  9. EIS-0032: 500 kV International Transmission Line NSP-TR-1, Forbes, Minnesota to Manitoba, Canada, Northern States Power Company

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration developed this EIS to evaluate the environmental impacts of a 500-kilovolt transmission line proposed by the Northern States Power Company to provide a transmission facility for the exchange of electrical energy between Canada and the United States.

  10. WP-96/TR-96 & TC-96 Power and Transmission Rate Case (rates/ratecases...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Of Decision (WP-96 ROD) Final Studies And Documentation (WP-96-FS) Loads and Resources Revenue Requirement Segmentation Marginal Cost Analysis Wholesale Power Rate Development...

  11. Planar Optical Waveguide Coupler Transformers for High-Power Solar Enegy Collection and Transmission

    Broader source: Energy.gov [DOE]

    This presentation was delivered at the SunShot Concentrating Solar Power (CSP) Program Review 2013, held April 23–25, 2013 near Phoenix, Arizona.

  12. Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line: Comments from Roseau County Board of Commissioners

    Broader source: Energy.gov [DOE]

    Motion was made by Commissioner Miller, seconded by Commissioner Falk on Minnesota Power - GNTL application to construct, operate, and maintain electric transmission facilities at the U.S. - Canada...

  13. Transmission SEAB Presentation

    Broader source: Energy.gov (indexed) [DOE]

    Market Power 368 Corridors ... evaluation of transmission applications Increase efficiency in administration ... MATL Project New t-line Financier Minority ...

  14. Efficient algorithm for locating and sizing series compensation devices in large power transmission grids: II. Solutions and applications

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Frolov, Vladimir; Backhaus, Scott; Chertkov, Misha

    2014-10-01

    In a companion manuscript, we developed a novel optimization method for placement, sizing, and operation of Flexible Alternating Current Transmission System (FACTS) devices to relieve transmission network congestion. Specifically, we addressed FACTS that provide Series Compensation (SC) via modification of line inductance. In this manuscript, this heuristic algorithm and its solutions are explored on a number of test cases: a 30-bus test network and a realistically-sized model of the Polish grid (~ 2700 nodes and ~ 3300 lines). The results on the 30-bus network are used to study the general properties of the solutions including non-locality and sparsity. The Polishmore » grid is used as a demonstration of the computational efficiency of the heuristics that leverages sequential linearization of power flow constraints and cutting plane methods that take advantage of the sparse nature of the SC placement solutions. Using these approaches, the algorithm is able to solve an instance of Polish grid in tens of seconds. We explore the utility of the algorithm by analyzing transmission networks congested by (a) uniform load growth, (b) multiple overloaded configurations, and (c) sequential generator retirements.« less

  15. Efficient algorithm for locating and sizing series compensation devices in large power transmission grids: II. Solutions and applications

    SciTech Connect (OSTI)

    Frolov, Vladimir; Backhaus, Scott; Chertkov, Misha

    2014-10-01

    In a companion manuscript, we developed a novel optimization method for placement, sizing, and operation of Flexible Alternating Current Transmission System (FACTS) devices to relieve transmission network congestion. Specifically, we addressed FACTS that provide Series Compensation (SC) via modification of line inductance. In this manuscript, this heuristic algorithm and its solutions are explored on a number of test cases: a 30-bus test network and a realistically-sized model of the Polish grid (~ 2700 nodes and ~ 3300 lines). The results on the 30-bus network are used to study the general properties of the solutions including non-locality and sparsity. The Polish grid is used as a demonstration of the computational efficiency of the heuristics that leverages sequential linearization of power flow constraints and cutting plane methods that take advantage of the sparse nature of the SC placement solutions. Using these approaches, the algorithm is able to solve an instance of Polish grid in tens of seconds. We explore the utility of the algorithm by analyzing transmission networks congested by (a) uniform load growth, (b) multiple overloaded configurations, and (c) sequential generator retirements.

  16. Efficient algorithm for locating and sizing series compensation devices in large power transmission grids: I. Model implementation

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Frolov, Vladimir; Backhaus, Scott; Chertkov, Misha

    2014-10-24

    We explore optimization methods for planning the placement, sizing and operations of Flexible Alternating Current Transmission System (FACTS) devices installed to relieve transmission grid congestion. We limit our selection of FACTS devices to Series Compensation (SC) devices that can be represented by modification of the inductance of transmission lines. Our master optimization problem minimizes the l1 norm of the inductance modification subject to the usual line thermal-limit constraints. We develop heuristics that reduce this non-convex optimization to a succession of Linear Programs (LP) which are accelerated further using cutting plane methods. The algorithm solves an instance of the MatPower Polishmore » Grid model (3299 lines and 2746 nodes) in 40 seconds per iteration on a standard laptop—a speed up that allows the sizing and placement of a family of SC devices to correct a large set of anticipated congestions. We observe that our algorithm finds feasible solutions that are always sparse, i.e., SC devices are placed on only a few lines. In a companion manuscript, we demonstrate our approach on realistically-sized networks that suffer congestion from a range of causes including generator retirement. In this manuscript, we focus on the development of our approach, investigate its structure on a small test system subject to congestion from uniform load growth, and demonstrate computational efficiency on a realistically-sized network.« less

  17. Efficient algorithm for locating and sizing series compensation devices in large power transmission grids: I. Model implementation

    SciTech Connect (OSTI)

    Frolov, Vladimir; Backhaus, Scott; Chertkov, Misha

    2014-10-24

    We explore optimization methods for planning the placement, sizing and operations of Flexible Alternating Current Transmission System (FACTS) devices installed to relieve transmission grid congestion. We limit our selection of FACTS devices to Series Compensation (SC) devices that can be represented by modification of the inductance of transmission lines. Our master optimization problem minimizes the l1 norm of the inductance modification subject to the usual line thermal-limit constraints. We develop heuristics that reduce this non-convex optimization to a succession of Linear Programs (LP) which are accelerated further using cutting plane methods. The algorithm solves an instance of the MatPower Polish Grid model (3299 lines and 2746 nodes) in 40 seconds per iteration on a standard laptop—a speed up that allows the sizing and placement of a family of SC devices to correct a large set of anticipated congestions. We observe that our algorithm finds feasible solutions that are always sparse, i.e., SC devices are placed on only a few lines. In a companion manuscript, we demonstrate our approach on realistically-sized networks that suffer congestion from a range of causes including generator retirement. In this manuscript, we focus on the development of our approach, investigate its structure on a small test system subject to congestion from uniform load growth, and demonstrate computational efficiency on a realistically-sized network.

  18. Final EIS for Champlain Hudson Power Express Transmission Project Now Available

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) has prepared a Final Environmental Impact Statement (EIS) to evaluate the potential environmental impacts in the United States of the proposed action to issue a Presidential permit to the Applicant, Champlain Hudson Power Express, Inc. (CHPEI), and the range of reasonable alternatives.

  19. EIS-0339: Presidential Permit Application, GenPower 500 kV Submarine Electric Transmission Cable from Nova Scotia to New York

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) announced its intent to prepare an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act of 1969 (NEPA) for GenPower New York, L.L.C.’s (GenPower) request for a Presidential permit for a proposed international electric transmission line.

  20. EIS-0411: Transmission Agency of Northern California Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

  1. Evaluating the Effect of Upgrade, Control and Development Strategies on Robustness and Failure Risk of the Power Transmission Grid

    SciTech Connect (OSTI)

    Newman, David E; Carreras, Benjamin A; Lynch, Vickie E; Dobson, Ian

    2008-01-01

    We use the OPA complex systems model of the power transmission system to investigate the effect of a series of different network upgrade scenarios on the long time dynamics and the probability of large cascading failures. The OPA model represents the power grid at the level of DC load flow and LP generation dispatch and represents blackouts caused by randomly triggered cascading line outages and overloads. We examine the effect of increased component reliability on the long-term risks, the effect of changing operational margins and the effect of redundancy on those same long-term risks. The general result is that while increased reliability of the components decreases the probability of small blackouts, depending on the implementation, it actually can increase the probability of large blackouts. When we instead increase some types of redundancy of the system there is an overall decrease in the large blackouts. As some of these results are counter intuitive these studies suggest that care must be taken when making what seem to be logical upgrade decisions.

  2. EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah

    Broader source: Energy.gov [DOE]

    This EIS is being prepared jointly by DOE’s Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western’s proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska.

  3. Transmission Losses Product (pbl/products)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wind Smoothing and Intertie Service (Pilot) Firstgov Pricing for Transmission Losses Product Bonneville Power Administration (BPA) Power Services offers to sell transmission...

  4. Wireless Power Transmission

    Office of Scientific and Technical Information (OSTI)

    ... incident field will change as compared to that of a ... I.6. SYSTEM CONSIDERATIONS Some additional system ... or GaAs FETs (tens of watts at X-band in class AB). ...

  5. Electrical Engineer- Transmission Lines

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration, Upper Great Plains Region, Maintenance, North Dakota Maintenance, Transmission...

  6. Current Transmission Rates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases Rate Information Current Power Rates Current Transmission Rates...

  7. Previous Transmission Rates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases Rate Information Current Power Rates Current Transmission Rates...

  8. National Transmission Grid Study

    Office of Environmental Management (EM)

    ... to meet present demand, daily transmission constraints or ... stations located close to fuel supplies or needed ... the Southwest Power Pool within the Eastern Interconnection. ...

  9. Electricity Transmission, A Primer

    Energy Savers [EERE]

    ... Biomass plants are best built near their source of fuel for ... the transmission grid by an authorized scheduling utility. ... Power Pool: Two or more inter- connected electric systems ...

  10. Collaborative Transmission Technology Roadmap

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Addendum to the Collaborative Transmission Technology Roadmap March 2014 Bonneville Power Administration Enhanced PDF Functionality Functionality of the PDF version of this...

  11. Drill string transmission line

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David S.; Bradford, Kline; Fox, Joe

    2006-03-28

    A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

  12. Transmission Siting_071508.indd

    Energy Savers [EERE]

    Transmission SEAB Presentation Transmission SEAB Presentation PDF icon Transmission SEAB Presentation More Documents & Publications Before House Natural Resources Committee QER - Comment of American Public Power Association 5 Before the House Committee on Natural Resources

    Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of

  13. Comments by the American Electric Power System on Proposed Coordination of Federal Authorizations for Electric Transmission Facilities

    Broader source: Energy.gov [DOE]

     Proposed Coordination of Federal Authorizations for Electric Transmission Facilities – Interim Final Rule and Proposed Rule (DOE, 10 CR Part 900): The utility operating companies of the American...

  14. Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.

    SciTech Connect (OSTI)

    Eyer, James M. (Distributed Utility Associates, Livermore, CA); Butler, Paul Charles; Iannucci, Joseph J., Jr.

    2005-11-01

    This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.

  15. NREL: Transmission Grid Integration - Transmission Planning and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for

  16. Transmission Planning Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identifymore » weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.« less

  17. Power Electronics for Distributed Energy Systems and Transmission and Distribution Applications: Assessing the Technical Needs for Utility Applications

    SciTech Connect (OSTI)

    Tolbert, L.M.

    2005-12-21

    Power electronics can provide utilities the ability to more effectively deliver power to their customers while providing increased reliability to the bulk power system. In general, power electronics is the process of using semiconductor switching devices to control and convert electrical power flow from one form to another to meet a specific need. These conversion techniques have revolutionized modern life by streamlining manufacturing processes, increasing product efficiencies, and increasing the quality of life by enhancing many modern conveniences such as computers, and they can help to improve the delivery of reliable power from utilities. This report summarizes the technical challenges associated with utilizing power electronics devices across the entire spectrum from applications to manufacturing and materials development, and it provides recommendations for research and development (R&D) needs for power electronics systems in which the U.S. Department of Energy (DOE) could make a substantial impact toward improving the reliability of the bulk power system.

  18. Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska

    SciTech Connect (OSTI)

    Not Available

    1991-06-01

    This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

  19. Storage & Transmission Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CAPACITY ALL FIGURES AS OF MARCH 2015 STORAGE & TRANSMISSION PROJECT LOAN PROGRAM ... Transmission LS Power Associates, NV Energy & John Hancock Eastern Nevada Loan ...

  20. Notice of Availability (NOA) for the Draft Environmental Impact Statement (EIS) and Announcement of Public Hearings for the Proposed New England Clean Power Link (NECPL) Transmission Line: Federal Register Notice, Volume 80, No. 113- Jun. 12, 2015

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announces the availability of the “Draft Environmental Impact Statement for the New England Clean Power Link Transmission Line Project” (DOE/EIS-0503) for public review and comment.

  1. Automated manual transmission controller

    DOE Patents [OSTI]

    Lawrie, Robert E.; Reed, Jr., Richard G.; Bernier, David R.

    1999-12-28

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  2. Transmission SEAB Presentation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission SEAB Presentation Transmission SEAB Presentation PDF icon Transmission SEAB Presentation More Documents & Publications Before House Natural Resources Committee QER - Comment of American Public Power Association 5 Before the House Committee on Natural Resources

  3. Class network routing

    DOE Patents [OSTI]

    Bhanot, Gyan; Blumrich, Matthias A.; Chen, Dong; Coteus, Paul W.; Gara, Alan G.; Giampapa, Mark E.; Heidelberger, Philip; Steinmacher-Burow, Burkhard D.; Takken, Todd E.; Vranas, Pavlos M.

    2009-09-08

    Class network routing is implemented in a network such as a computer network comprising a plurality of parallel compute processors at nodes thereof. Class network routing allows a compute processor to broadcast a message to a range (one or more) of other compute processors in the computer network, such as processors in a column or a row. Normally this type of operation requires a separate message to be sent to each processor. With class network routing pursuant to the invention, a single message is sufficient, which generally reduces the total number of messages in the network as well as the latency to do a broadcast. Class network routing is also applied to dense matrix inversion algorithms on distributed memory parallel supercomputers with hardware class function (multicast) capability. This is achieved by exploiting the fact that the communication patterns of dense matrix inversion can be served by hardware class functions, which results in faster execution times.

  4. Railroad Routing Model

    Energy Science and Technology Software Center (OSTI)

    1995-01-05

    INTERLINE/PC is an interactive program designed to simulate the routing practices of the United States rail system. The rail industry is divided into a large number of independent competing companies. The INTERLINE data base represents these rail companies as 94 separate subnetworks. An additional two subnetworks represent navigable inland/intracoastal and deep draft marine routes. Interchange points between individual rail systems and waterway systems are also identified.

  5. Washington/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Avista, Pacificorp, Puget Sound Energy, Tacoma Public Utilities, Bonneville Power Administration, Columbia Grid, Northern Tier Transmission Group, and Seattle City...

  6. Transmission Infrastructure: FERCs Role

    U.S. Energy Information Administration (EIA) Indexed Site

    power by reducing transmission congestion congestion - - promote capital investment in the promote capital investment in the enlargement, improvement, maintenance, enlargement, ...

  7. Generation and Transmission Maximization Model | Open Energy...

    Open Energy Info (EERE)

    its limited energy and transmission resources, but also firm contracts, independent power producer (IPP) agreements, and bulk power transaction opportunities on the spot...

  8. Wyoming/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Lower Valley Energy, High West Energy, Western Area Power Administration, Bonneville Power Administration, Tri-State Generation and Transmission Association, Inc., and Rocky...

  9. California/Transmission | Open Energy Information

    Open Energy Info (EERE)

    San Diego Gas & Electric, Sacramento Municipal Utility District, PacifiCorp, Bonneville Power Administration, Transmission Agency of Northern California, and Western Area Power...

  10. Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Grid Integration - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  11. Development of NS-TACSR with extremely suppressed aeolian noise and its application to 500 kV overhead transmission lines

    SciTech Connect (OSTI)

    Tsujimoto, K.; Furukawa, S. (Kansai Electric Power Co., Inc., Osaka (Japan)); Shimojima, K.; Yamamoto, K. (Hitachi Cable, Ltd., Hitachi (JP))

    1991-10-01

    Recently in Japan, with the unprecedented advance of residential area development in the suburbs of large cities, it has become quite difficult to secure the routes of EHV transmission lines from nuclear power plants in remote places to the suburbs of large cities, urging resolution of environmental problems related to transmission lines. In Japan, aerodynamic sound produced by conductors and insulators frequently caused noise problems. Having an opportunity of constructing a 500 kV transmission line through a residential are, we made a research to resolve this noise problem. This paper describes the characteristics of aeolian noise and preventive measures against it.

  12. Transmission Developers Inc.

    Energy Savers [EERE]

    ' % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of

  13. Hydromechanical transmission

    DOE Patents [OSTI]

    Orshansky, Jr. deceased, Elias; Weseloh, William E.

    1978-01-01

    A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

  14. Collective network routing

    DOE Patents [OSTI]

    Hoenicke, Dirk

    2014-12-02

    Disclosed are a unified method and apparatus to classify, route, and process injected data packets into a network so as to belong to a plurality of logical networks, each implementing a specific flow of data on top of a common physical network. The method allows to locally identify collectives of packets for local processing, such as the computation of the sum, difference, maximum, minimum, or other logical operations among the identified packet collective. Packets are injected together with a class-attribute and an opcode attribute. Network routers, employing the described method, use the packet attributes to look-up the class-specific route information from a local route table, which contains the local incoming and outgoing directions as part of the specifically implemented global data flow of the particular virtual network.

  15. Transmission Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Grid Tech Team U.S. Department of Energy DOE Grid Tech Team (GTT) The Grid Tech Team ... regional diversity, AC-DC transmission and distribution solutions, ...

  16. Transmission decisions

    SciTech Connect (OSTI)

    Ellison, C.T. )

    1993-03-01

    As the US FERC moves forward to implement the transmission access provisions of the National Energy Policy Act of 1992, the debate over Regional Transmission Groups continues. Independent energy producers have much at stake in this debate and their reaction to the general RTG concept and to specific RTG proposals will weigh heavily in determining the fate of these proposals.

  17. Wind Integration, Transmission, and Resource Assessment and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Characterization Projects | Department of Energy Integration, Transmission, and Resource Assessment and Characterization Projects Wind Integration, Transmission, and Resource Assessment and Characterization Projects This report covers the Wind and Water Power Technologies Office's Wind integration, transmission, and resource assessment and characterization projects from fiscal years 2006 to 2014. PDF icon Wind Integration, Transmission, and Resource Assessment and Characterization Projects

  18. Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line: Federal Register Notice, Vol. 79, No. 93- May 14, 2014

    Broader source: Energy.gov [DOE]

    Application from Great Northern  (GNTL) to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. Federal Register Notice.

  19. Property:EIA/861/ActivityTransmission | Open Energy Information

    Open Energy Info (EERE)

    Description: Activity Transmission Entity engages in power transmission activity (Y or N) 1 References EIA Form EIA-861 Final Data File for 2008 - F861 File...

  20. Fact #802: November 4, 2013 Market Share by Transmission Type

    Broader source: Energy.gov [DOE]

    The variety of transmission technologies has increased as manufacturers seek more efficient ways of transferring power from the engine to the wheels of the vehicles. Automatic transmissions with...

  1. Tri State Generation and Transmission Association Inc | Open...

    Open Energy Info (EERE)

    and Transmission Association Inc Place: Westminster, Colorado Zip: 80234 Product: A wholesale electric power asset operator and transmission grid. Coordinates: 43.07212,...

  2. NREL: Transmission Grid Integration - Glossary of Transmission Grid

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Integration Terms Glossary of Transmission Grid Integration Terms The following glossary defines common transmission grid integration terms and concepts. Ancillary services Services that help grid operators maintain balance on electric power systems. These include regulation and the contingency reserves: spinning, non-spinning, and, in some regions, supplemental operating. Balancing authority area A metered segment of the electric power system in which electrical balance is maintained. In a

  3. EIS-0231: Navajo Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned...

  4. Automated manual transmission clutch controller

    DOE Patents [OSTI]

    Lawrie, Robert E.; Reed, Jr., Richard G.; Rausen, David J.

    1999-11-30

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  5. Transmission Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Services BPA Clarifications on the DSO216 1 Document updated on 2242015 at 3:29:25 PM B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Clarifications on...

  6. Transmission line capital costs

    SciTech Connect (OSTI)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  7. VHDL Control Routing Simulator

    Energy Science and Technology Software Center (OSTI)

    1995-07-10

    The control router simulates a backplane consisting of up to 16 slot. Slot 0, reserved for a control module (cr-ctrl), generates the system clocks and provides the serial interface to the Gating Logic. The remaining 15 slots (1-15) contain routing modules (cr mod), each having up to 64 serial inputs and outputs with FIFOs. Messages to be transmitted to the Control Router are taken from text files. There are currently 17 such source files. Inmore » the model, the serial output of each source is connected to multiple receivers, so that there are 8 identical messages transmitted to the router for each message file entry.« less

  8. Southline Transmission Line | Open Energy Information

    Open Energy Info (EERE)

    Analysis Type EIS Applicant Southline Transmission, LLC, a subsidiary of Hunt Power L.P. Consultant SWCA Environmental Consultants Geothermal Area Project Location Project...

  9. Microsoft Word - 20140522 Petroleum Transmission Storage and...

    Broader source: Energy.gov (indexed) [DOE]

    ... Perhaps foremost was the interdependency of liquids transmission and electrical generation. Widespread power outages, coupled with reliance of the fuel pumping facilities and ...

  10. Nevada/Transmission | Open Energy Information

    Open Energy Info (EERE)

    own transmission facilities in the State of Nevada: NV Energy, Bonneville Power Administration, and Valley Electric Association, Colorado River Commission, Los...

  11. Oregon/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Electric Cooperative, Columbia Grid, Northern Tier Transmission Group, and Bonneville Power Administration. Oregon Energy Policy The Oregon Department of Energy's Governor's...

  12. Supervisory Transmission Lines and Substation Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  13. International 345 kV transmission line to Highgate, Vermont: environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1985-02-01

    The action under consideration is the issuance of a Presidential permit to the Vermont Electric Power Company, Inc. (VELCO) for the construction, operation, maintenance and connection of a facility that will cross the United States-Canada border for international transmission of electric energy. The proposed transmission facilities will consist of a 7.5 mile, alternating current (ac) transmission line and a 200 MW back-to-back direct current (dc) converter terminal station. None of the facilities will involve any polluting emissions. The construction and maintenance of the proposed converter terminal station and transmission facilities will have little or no impact on the geologic features of the region. The transmission line will have little or no effect on agricultural land. Impacts on commercial forestry in the area will be minimal. The proposed route will require clearing about 36 acres of forest. The proposed transmission line and converter terminal site will have no effect on recreational activities, mining activites, residential, commercial, or industrial land use. The proposed corridor will have a minimal impact on area terrestrial wildlife and plant communities. The proposed project will have little or no impact on future population distribution, the operation of local services, employment and economic benefit, or housing in either Franklin or Highgate. 16 references, 3 figures. (ACR)

  14. Energy Efficiency, Renewables, Advanced Transmission and Distribution

    Energy Savers [EERE]

    Technologies (2008) | Department of Energy Renewables, Advanced Transmission and Distribution Technologies (2008) Energy Efficiency, Renewables, Advanced Transmission and Distribution Technologies (2008) PDF icon Energy Efficiency, Renewables, Advanced Transmission and Distribution Technologies (2008) More Documents & Publications Financial Institution Partnership Program - Commercial Technology Renewable Energy Generation Projects Issued: October 7, 2009 Nuclear Power Facilities (2008)

  15. Regional Transmission Projects: Finding Solutions

    SciTech Connect (OSTI)

    The Keystone Center

    2005-06-15

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

  16. NREL: Transmission Grid Integration - Eastern and Western Wind...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Geographic diversity Load correlation Estimate power ... variability Potential transmission line loadings Simple economic ... Office of Energy Efficiency and Renewable Energy, ...

  17. Power System Dispatcher (Trainer)

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Power System Operations Transmission Switching (J4100) 5555...

  18. Supervisory Power System Dispatcher

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Power System Operations, J4800 Transmission Scheduling &...

  19. Power System Dispatcher

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Power System Operations Transmission Switching (J4100) 5555...

  20. Transmission | Department of Energy

    Energy Savers [EERE]

    resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on...

  1. Transmission Business Line

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Business Line Non-Federal Financing of Transmission Projects - March 2004 Critical paths on the Northwest transmission grid are congested and the system is near or at...

  2. NREL: Transmission Grid Integration Home Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photo of transmission lines with a city in the background. NREL works with electric utilities, energy policymakers, and other industry partners to integrate large-scale renewable energy into the transmission system. Researchers study transmission and grid integration issues and provide data, analysis, and models to enable the electric power system to more efficiently manage the variability of renewables such as solar and wind power. Wind and solar energy offer environmental benefits, low

  3. RAIL ROUTING PRACTICES AND PROPOSED ALTERNATIVES

    Office of Environmental Management (EM)

    on "Strawman" Report: RAIL ROUTING PRACTICES AND PROPOSED ALTERNATIVES Number Section Comment Response RTG-1-AAR SECTION II Safeguards Routing Regulations, Para. 2 The NRC has identified five types of route characteristics that receive special consideration when NRC staff review routes for approval pursuant to 10 CFR 73: (1) routes through highly populated areas; (2) routes that would place the shipment or escort vehicle in a significantly disadvantageous position (for example, tunnels

  4. Proposed amendment for Presidential Permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada Northern States Power Company. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Northern States Power Company, (NSP), a Minnesota investor owned utility has applied to the Office of Fossil Energy, United States Department of Energy, to amend Presidential Permit PP-63 to allow for alterations to the 500 kV transmission line and as sedated facilities currently regulated by this permit. The alterations proposed for the 500 kV line owned by NSP are part of a long term effort sponsored by NSP to upgrade the existing NSP transmission system to allow for increased exchange of electricity with the Manitoba Hydro-Electric Board. Presidential Permit PP-63 authorized NSP to construct, connect, operate and maintain a 500 kV line at the United States/Canadian border approximately seven-and-a-half miles west of Warroad in Roseau County, Minnesota. This line connects with a 500 kV line owned and operated by the Manitoba Hydro-Electric Board (MHEB), which extends from Dorsey, Manitoba, Canada to the United States/Canadian border. NSP proposes to increase the electricity transfer capability of this transmission facility by constructing a new 80-acre substation on the existing 500 kV line in Roseau County, Minnesota, and upgrading the existing substation at Forbes, Minnesota. The proposed Roseau substation would contain two 41.5 ohm series capacitor banks. In addition, static VAR compensators are to be installed at the existing Forbes Substation. Approximately 5 acres would be added to the 30-acre Forbes site to house the additional equipment. No new lines would enter or exit the facility. NSP proposes to place the new Roseau Substation in service in May 1993 and to complete the upgrading of the Forbes Substation in March 1994. The primary, initial purpose of these modifications is to enable NSP to import 400 megawatts of electric power from MHEB during the summer months to meet peak electrical demand in the Minneapolis-St. Paul area. It is expected that this power transfer would begin in 1993.

  5. DOE Transmission Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Order No. 1000 Transmission Ratemaking Enabling New Resources - Demand Response - Variable Generation - Storage 2 Stages of Transmission Planning - Local, ...

  6. 2006 Final Transmission Proposal: Revenue Requirements Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2005-06-01

    The purpose of the Revenue Requirement Study (Study) is to establish the level of revenues needed from rates for Bonneville Power Administration's (BPA's) transmission and ancillary services to recover, in accordance with sound business principles, costs associated with the transmission of electric power over the Federal Columbia River Transmission System (FCRTS). The FCRTS is part of the larger Federal Columbia River Power System (FCRPS) which also includes the hydroelectric, multipurpose facilities constructed and operated by the U.S. Army Corps of Engineers and the Bureau of Reclamation in the Pacific Northwest. The FCRPS costs that are not included in the FCRTS costs are funded and repaid through BPA power rates. The transmission revenue requirements herein include: recovery of the Federal investment in transmission and transmission-related assets; the operations and maintenance (O&M) and other annual expenses associated with the provision of transmission and ancillary services; the cost of generation inputs for ancillary services and other between business-line services necessary for the transmission of power; and all other transmission-related costs incurred by the Administrator. The cost evaluation period for this rate proposal includes Fiscal Years (FYs) 2005-2007, the period extending from the last year for which historical information is available through the proposed rate test period. The Study includes the transmission revenue requirements for the rate test period, FYs 2006-2007 (Rate Period) and the results of transmission repayment studies. This Study outlines the policies, forecasts, assumptions, and calculations used to determine BPA's transmission revenue requirements. Legal requirements are summarized in Chapter 5 of this Study. The Revenue Requirement Study Documentation (Documentation), TR-06-FS-BPA-01A, contains key technical assumptions and calculations, the results of the transmission repayment studies, and a further explanation of the repayment inputs and its outputs.

  7. Final Report Navajo Transmission Project (NTP)

    SciTech Connect (OSTI)

    Bennie Hoisington; Steven Begay

    2006-09-14

    The Din Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

  8. National Electric Transmission Congestion Studies

    Office of Energy Efficiency and Renewable Energy (EERE)

    Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to include in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmission capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor).

  9. RAPID/BulkTransmission/Transmission Siting & Interconnection...

    Open Energy Info (EERE)

    federal review). Bulk Transmission Transmission Siting & Interconnection in New Mexico New Mexico Statutes (N.M.S.) 62-9-1, 62-9-3(B), and 62-9-3.2 No Location Permit may be...

  10. A New Route to Nano Self-Assembly

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A New Route to Nano Self-Assembly A New Route to Nano Self-Assembly Print Wednesday, 24 February 2010 00:00 If the promise of nanotechnology is to be fulfilled, nanoparticles will have to be able to make something of themselves. An important advance toward this goal has been achieved by researchers who have found a simple and yet powerfully robust way to induce nanoparticles to assemble themselves into complex arrays. By adding specific types of small molecules to mixtures of nanoparticles and

  11. NREL: Transmission Grid Integration - Research Staff

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Staff NREL's transmission and grid integration research staff work to incorporate renewable energy into the transmission system primarily through NREL's Power Systems Engineering Center. Photo of Barbara O'Neill Barbara O'Neill, Transmission and Grid Integration Group Manager M.S., Energy Management and Policy, University of Pennsylvania Engineering Diploma, Petroleum Economics and Management, French Institute of Petroleum B.S., Electrical Engineering, Pratt Institute Barbara has a

  12. Power system

    DOE Patents [OSTI]

    Hickam, Christopher Dale

    2008-03-18

    A power system includes a prime mover, a transmission, and a fluid coupler having a selectively engageable lockup clutch. The fluid coupler may be drivingly connected between the prime mover and the transmission. Additionally, the power system may include a motor/generator drivingly connected to at least one of the prime mover and the transmission. The power-system may also include power-system controls configured to execute a control method. The control method may include selecting one of a plurality of modes of operation of the power system. Additionally, the control method may include controlling the operating state of the lockup clutch dependent upon the mode of operation selected. The control method may also include controlling the operating state of the motor/generator dependent upon the mode of operation selected.

  13. Transmission Capacity Forum

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Email Address: Name: Organization Entity Type: Select the best fit for your role... Energy Trader Transmission Provider Employee Transmission Purchaser Energy Scheduler...

  14. Transmission Line Security Monitor: Final Report

    SciTech Connect (OSTI)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  15. Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500-kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada, Northern States Power Company. Addendum to the final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

  16. Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    SciTech Connect (OSTI)

    Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

    2011-02-01

    The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

  17. 2006 National Electric Transmission Congestion Study and Related Materials

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy 6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints and identifies areas that are transmission-constrained. This is the first Congestion Study the Department conducted. Based on this study, two National Interest Electric

  18. 2009 Electric Transmission Congestion Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in

  19. EIS-0285: Transmission System Vegetation Management Program

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations. This...

  20. Agenda: Electricity Transmission, Storage and Distribution- West

    Broader source: Energy.gov [DOE]

    The subject of transmission has many facets: its role in bulk power reliability, including how to maintain reliability with a changing resource mix; the planning, cost-allocation and state &...

  1. Wind Energy Transmission | Open Energy Information

    Open Energy Info (EERE)

    Wind Energy Transmission Jump to: navigation, search Photoshop art created from two NREL-PIX photos (10929 & 15185) of a sunset view of electrical power towers combined with wind...

  2. TEC Working Group Topic Groups Routing

    Broader source: Energy.gov [DOE]

    The Routing Topic Group has been established to examine topics of interest and relevance concerning routing of shipments of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) to a...

  3. Automated manual transmission shift sequence controller

    DOE Patents [OSTI]

    Lawrie, Robert E.; Reed, Richard G.; Rausen, David J.

    2000-02-01

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  4. Automated manual transmission mode selection controller

    DOE Patents [OSTI]

    Lawrie, Robert E.

    1999-11-09

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  5. TEC Working Group Topic Groups Routing Meeting Summaries | Department...

    Office of Environmental Management (EM)

    Routing Meeting Summaries TEC Working Group Topic Groups Routing Meeting Summaries MEETING SUMMARIES PDF icon Atlanta TEC Meeting, Routing Topic Group Summary More Documents &...

  6. Placing power linres : GIS helps site energy corridors.

    SciTech Connect (OSTI)

    Kuiper, J. A.; Cantwell, B.; Hlohowskyj, I.; Moore, H. R.

    2011-08-01

    Turn the lights on when you enter a room, then turn the lights off when you leave. Most of us repeat this sequence many times each day, and never give it another thought. But that seemingly simple light switch on the wall connects us to one of the most complex systems in the world: the electrical grid. Most of the United States is served by a highly reliable and adequate supply of electrical power, which is distributed through a grid of thousands of miles of electricity-transmission lines. However, as the electricity-supply infrastructure ages and consumer demand for electricity grows, the capacity to deliver electrical power hasn't kept pace with demand, and upgrading the electrical-transmission grid has become a more pressing need. From 1988-1998, demand for transmission grew by 30 percent while transmission grew by only 15 percent. From 1999-2009, demand grew by 20 percent and transmission by only 3 percent Despite a short-term decline related to the economic downturn and improved efficiency, U.S. energy consumption is expected to increase by 14 percent between 2008 and 2035. This growth will drive the need to develop viable routes for new transmission lines. Because transmission lines extend over large distances, they typically cross many federal, tribal, state, local and private land jurisdictions, each with a complex and varying set of siting issues and land-management practices. And as the existing grid needs improvement to meet growing demand, the U.S. is rapidly developing renewable energy sources, particularly solar and wind energy, often in areas far removed from existing electricity-transmission infrastructure and energy-consumption areas.

  7. NREL: Transmission Grid Integration - Western Wind and Solar...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (e.g., loss of a large power plant or a major transmission line) is critical to system ... of Energy, Office of Energy Efficiency and Renewable Energy, operated ...

  8. NREL: Transmission Grid Integration - NREL Study Indicates Economic...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wyoming wind power to the California marketplace via a 3,000 megawatt high-voltage direct current transmission line. ... energy and energy efficiency research and development. ...

  9. Lane-Wendson No. 1 Transmission Line Rebuild Project

    Office of Environmental Management (EM)

    No. 1 Transmission Line Rebuild Project Finding of ... OF ENERGY Bonneville Power Administration DOEEA-1952 ... right-of-way and easements to minimize impacts to ...

  10. EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...

    Energy Savers [EERE]

    Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental...

  11. EIS-0451: Hooper Springs Transmission Project, Caribou County...

    Broader source: Energy.gov (indexed) [DOE]

    DOE's Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line from BPA's...

  12. Midwest Independent Transmission System Operator Smart Grid Project...

    Open Energy Info (EERE)

    to optimize the dispatch and operation of power plants while improving the reliability of the bulk transmission system. This project deploys phasor measurement units...

  13. Report on Transmission Cost Allocation for RTOs and Others (Presentation)

    SciTech Connect (OSTI)

    Coles, L.; Porter, K.

    2011-05-01

    This presentation describes in summary fashion some present transmission cost allocation methods, especially as this relates to the development of utility-scale renewable power sources.

  14. RAPID/BulkTransmission/Environment/Texas | Open Energy Information

    Open Energy Info (EERE)

    to Electric Power Transmission CCP Art. 49 Inquests upon dead bodies Fact Sheet - Air Quality Permitting Form PI-1 General Application for Air Preconstruction Permit RRC -...

  15. DOE Announces Webinars on Transmission for Tribal Energy Development...

    Energy Savers [EERE]

    Attendees will have an opportunity to learn from tribal energy and power industry experts on topics such as grid fundamentals, transmission markets, interconnection request ...

  16. RAPID/Geothermal/Transmission Siting & Interconnection/Hawaii...

    Open Energy Info (EERE)

    plant or equipment, or any part thereof, directly or indirectly for public use...for production, conveyance, transmission, delivery, or furnishing of light, power, heat, cold,...

  17. Wind Integration, Transmission, and Resource Assessment andCharacteri...

    Office of Environmental Management (EM)

    Wind Integration, Transmission, and Resource Assessment and Characterization Projects This report covers the Wind and Water Power Technologies Office's Wind integration, ...

  18. Bonneville Power Administration

    Energy Savers [EERE]

    March 2015 Bonneville Power Administration's Hooper ... circuit 115-kV transmission line that will extend generally ... new land rights acquired for ROW or access road easements. ...

  19. BPA Power Services (PBL)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Executives Hydro Power 2010 Modified Streamflows BPA Fuel Mix Site Map Other Related Web Sites: BPA Energy Efficiency (EE) BPA Transmission Services BPA Environment, Fish, &...

  20. Current Power Rates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases Rate Information Current Power Rates Current Transmission Rates...

  1. Previous Power Rates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases Rate Information Current Power Rates Current Transmission Rates...

  2. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    O&M Costs (Column AZ) Present Value of Periodic Capital Replacement Cost (Column BA) Power System Transmission System Coincident Factor (Column BB) Distribution System...

  3. PowerPoint Presentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric Power System Transition to a Modern Grid Distribution ... farms * Higher DC and AC transmission voltages - Reduce line losses * Low loss cables * Cyber ...

  4. A New Route to Nano Self-Assembly

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A New Route to Nano Self-Assembly Print If the promise of nanotechnology is to be fulfilled, nanoparticles will have to be able to make something of themselves. An important advance toward this goal has been achieved by researchers who have found a simple and yet powerfully robust way to induce nanoparticles to assemble themselves into complex arrays. By adding specific types of small molecules to mixtures of nanoparticles and polymers, they were able to direct the self-assembly of the

  5. A New Route to Nano Self-Assembly

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A New Route to Nano Self-Assembly Print If the promise of nanotechnology is to be fulfilled, nanoparticles will have to be able to make something of themselves. An important advance toward this goal has been achieved by researchers who have found a simple and yet powerfully robust way to induce nanoparticles to assemble themselves into complex arrays. By adding specific types of small molecules to mixtures of nanoparticles and polymers, they were able to direct the self-assembly of the

  6. A New Route to Nano Self-Assembly

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A New Route to Nano Self-Assembly Print If the promise of nanotechnology is to be fulfilled, nanoparticles will have to be able to make something of themselves. An important advance toward this goal has been achieved by researchers who have found a simple and yet powerfully robust way to induce nanoparticles to assemble themselves into complex arrays. By adding specific types of small molecules to mixtures of nanoparticles and polymers, they were able to direct the self-assembly of the

  7. A New Route to Nano Self-Assembly

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A New Route to Nano Self-Assembly Print If the promise of nanotechnology is to be fulfilled, nanoparticles will have to be able to make something of themselves. An important advance toward this goal has been achieved by researchers who have found a simple and yet powerfully robust way to induce nanoparticles to assemble themselves into complex arrays. By adding specific types of small molecules to mixtures of nanoparticles and polymers, they were able to direct the self-assembly of the

  8. EIS-0390: Eastern Plains Transmission Project, Colorado and Kansas.

    Broader source: Energy.gov [DOE]

    This EIS is for Western Area Power Administration's proposal to participate with Tri-State Generation and Transmission Association, Inc. (Tri-State), to construct the proposed Eastern Plains Transmission Project (Project). Western’s participation with Tri-State would be in exchange for capacity rights on the transmission lines.

  9. Zone routing in a torus network

    DOE Patents [OSTI]

    Chen, Dong; Heidelberger, Philip; Kumar, Sameer

    2013-01-29

    A system for routing data in a network comprising a network logic device at a sending node for determining a path between the sending node and a receiving node, wherein the network logic device sets one or more selection bits and one or more hint bits within the data packet, a control register for storing one or more masks, wherein the network logic device uses the one or more selection bits to select a mask from the control register and the network logic device applies the selected mask to the hint bits to restrict routing of the data packet to one or more routing directions for the data packet within the network and selects one of the restricted routing directions from the one or more routing directions and sends the data packet along a link in the selected routing direction toward the receiving node.

  10. State action in regional transmission groups

    SciTech Connect (OSTI)

    Rokach, J.Z.

    1994-12-01

    States should participate in coordinated transmission planning through regional transmission groups, while reserving their right to pass upon transmission planning. This would smooth an otherwise difficult transition, as FERC and state regulators seek to facilitate a competitive bulk power market that ignores arbitrary jurisdiction lines. Since the Federal Energy Regulatory Commission issued its Policy Statement on Regional Transmission Groups, two RTG`s, the Western Regional Transmission Association and the Southwest Regional Transmission Association, have gained conditional approval from FERC. A third, the Northwest Regional Transmission Association, files its governing agreement with the Commission, seeking FERC`s approval. Price setting within RTGs and information exchanges involved in planning the grid raise questions of the legality of these collective actions under the antitrust laws. All three agreements allow for exchanges of commercial and planning information, but, conspicuously, do not set transmission prices. For the moment, therefore, antitrust liability for RTGs would arise out of the information exchanges involved in planning the grid. In addition, with FERC pushing for `restructuring` at the wholesale level through open access and the states becoming aggressive in trying to institute competition at the consumer level through retail wheeling, issues of federal-state jurisdiction in transmission have come to the fore.

  11. 2012 Wholesale Power and Transmission Rate

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B - PF-02 Customer Percentages and Customer-Specific PF-02 Refunds Exhibit C - Renewable Energy Certificates and Carbon Attributes to IOUs Exhibit D - Illustrative Table for...

  12. HVDC power transmission environmental issues review

    SciTech Connect (OSTI)

    Bailey, W.H.; Weil, D.E. [Bailey Research Associates, Inc., New York, NY (United States); Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States)

    1997-04-01

    This report strives to define the various environmental effects associated with HVDC lines, discusses the current knowledge of their potential effects on biological and non-biological systems, and compares these effects associated with ac lines where appropriate.

  13. Westgate Alternate Routes | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Westgate Alternate Routes Avoid the white-knuckled commute and antacids for breakfast! If you take I-55 north to Lemont Road to enter through Westgate in the morning, you may want to consider taking an alternate route in order to avoid potential traffic safety risks. Three alternate routes are mapped out, and turn-by-turn directions are listed below. Alternate Route 1 If you're coming from the north: Head south on I-355, and take either the 75th Street exit heading east or the 87th Street

  14. Which route to coal liquefaction

    SciTech Connect (OSTI)

    Nene, R.G.

    1981-11-01

    Two main methods for producing liquid fuels from coal are currently undergoing intensive evaluation. One, direct liquefaction (e.g., SRC-II, Exxon Donor Solvent (EDS), and H-Coal) produces liquid fuels directly from coal; the other, indirect liquefaction (e.g., Lurgi gasifier followed by Fischer-Tropsch, and Shell-Koppers gasifier followed by methanol synthesis and Mobil's MTG process) first gasifies coal and then converts the gaseous material into liquid products. This paper compares both routes basing its assessment on yields, thermal efficiencies, elemental balances, investment, complexity, and state of development. It is shown that direct liquefaction is more efficient and produces more product per investment dollar. Higher efficiency for direct liquefaction is verified bY stoichiometric and thermodynamic analysis. All approaches require about the same capital investment per unit of feed. Indirect liquefaction can be either more or less complex than direct liquefaction, depending upon the process. Direct liquefaction is least developed. 8 refs.

  15. EIS-0474: Southline Transmission Line Project; Arizona and New Mexico |

    Energy Savers [EERE]

    Department of Energy 474: Southline Transmission Line Project; Arizona and New Mexico EIS-0474: Southline Transmission Line Project; Arizona and New Mexico Summary The Bureau of Land Management and Western Area Power Administration are preparing an EIS as joint lead agencies to evaluate the potential environmental impacts of the proposed Southline Transmission Project and address associated potential land use plan amendments. The project would consist of a new 225-mile transmission line

  16. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Open Access Tariff Standards of Conduct Transmission Planning Open Access Tariff Pursuant to an agreement between Southwestern and Southwest Power Pool, Inc. (SPP), which became effective April 1, 2005, SPP administers Southwestern's Tariff for all new transactions using Southwestern's transmission system. All new requests for transmission service using Southwestern's transmission facilities should be made through SPP. Background In Order No. 888, the Federal Energy Regulatory Commission (FERC)

  17. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Carlos Valencia Named Director of Transmission Engineering and Planning Carlos Valencia Named Director of Division of Transmission Engineering and Planning Carlos Valencia Carlos Valencia has been selected to serve as Director of the Division of Transmission Engineering and Planning at Southwestern Power Administration (Southwestern), effective June 29, 2014. Valencia, who has served as the agency's Director of Maintenance since 2009, has extensive experience in the management of transmission

  18. NREL: Transmission Grid Integration - Data and Resources

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Data and Resources NREL offers the following transmission integration-related data and resources. Wind Integration Datasets The Wind Integration Datasets provide energy professionals with a consistent set of wind profiles for the United States. These include the Eastern Wind Dataset, Western Wind Dataset, and Wind Integration National Dataset (WIND) Toolkit. Solar Power Data for Integration Studies The Solar Power Data for Integration Studies consist of one year (2006) of 5-minute solar power

  19. Energy Transmission and Infrastructure

    SciTech Connect (OSTI)

    Mathison, Jane

    2012-12-31

    The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

  20. Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line: Notice of Intent to Prepare an Environmental Impact Statement: Federal Register Notice, Volume 79, No. 124, June 27, 2014

    Broader source: Energy.gov [DOE]

    Application for Presidential Permit OE Docket No. PP-398 Great Northern Transmission Line: Notice of Intent to Prepare an Environmental Impact Statement

  1. Generation and Transmission Maximization Model

    Energy Science and Technology Software Center (OSTI)

    2001-04-05

    GTMax was developed to study complex marketing and system operational issues facing electric utility power systems. The model maximizes the value of the electric system taking into account not only a single system''s limited energy and transmission resources but also firm contracts, independent power producer (IPP) agreements, and bulk power transaction opportunities on the spot market. GTMax maximizes net revenues of power systems by finding a solution that increases income while keeping expenses at amore » minimum. It does this while ensuring that market transactions and system operations are within the physical and institutional limitations of the power system. When multiple systems are simulated, GTMax identifies utilities that can successfully compete on the market by tracking hourly energy transactions, costs, and revenues. Some limitations that are modeled are power plant seasonal capabilities and terms specified in firm and IPP contracts. GTMax also considers detaile operational limitations such as power plant ramp rates and hydropower reservoir constraints.« less

  2. Integrated Transmission and Distribution Control

    SciTech Connect (OSTI)

    Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

    2013-01-16

    Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

  3. Series Transmission Line Transformer

    DOE Patents [OSTI]

    Buckles, Robert A.; Booth, Rex; Yen, Boris T.

    2004-06-29

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  4. Transmission - Contact Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact-Information-Transmission Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  5. 2012 Transmission Rate Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Transmission, Ancillary, and Control Area Service Rate Schedules and General Rate Schedule Provisions (FY 2014-2015) October 2013 United States Department of Energy...

  6. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedules Skip Navigation Links Excess Energy Hydro Peaking Power Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative (Rayburn) Hydro Power and Energy Sold to Sam Rayburn Municipal Power Agency (Willis) Non-Federal Transmission/Interconnection Facilities Service Contact swparates@swpa.gov Last Updated: January 05, 2016

  7. PP-76-1 The Vermont Electric Transmission Company | Department of Energy

    Energy Savers [EERE]

    76-1 The Vermont Electric Transmission Company PP-76-1 The Vermont Electric Transmission Company Presidential Permit authorizing The Vermont Electric Transmission Company to construct, operate, and maintain transmission facilities at the U.S. - Canada Border PDF icon PP-76-1 The Vermont Electric Transmission Company More Documents & Publications PP-76 The Vermont Electric Transmission Company PP-69 Vermont Electric Cooperative, Inc. PP-66-1 Vermont Electric Power Company, Inc.

  8. 2006 Final Transmission Proposal: Revenue Requirement Study Documentation.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2005-06-01

    The purpose of the Revenue Requirement Study (Study) is to establish the level of revenues needed from rates for Bonneville Power Administration's (BPA's) transmission and ancillary services to recover, in accordance with sound business principles, costs associated with the transmission of electric power over the Federal Columbia River Transmission System (FCRTS). The FCRTS is part of the larger Federal Columbia River Power System (FCRPS) which also includes the hydroelectric, multipurpose facilities constructed and operated by the U.S. Army Corps of Engineers and the Bureau of Reclamation in the Pacific Northwest. The FCRPS costs that are not included in the FCRTS costs are funded and repaid through BPA power rates. The transmission revenue requirements herein include: recovery of the Federal investment in transmission and transmission-related assets; the operations and maintenance (O&M) and other annual expenses associated with the provision of transmission and ancillary services; the cost of generation inputs for ancillary services and other between business-line services necessary for the transmission of power; and all other transmission-related costs incurred by the Administrator. The cost evaluation period for this rate proposal includes Fiscal Years (FYs) 2005-2007, the period extending from the last year for which historical information is available through the proposed rate test period. The Study includes the transmission revenue requirements for the rate test period, FYs 2006-2007 (Rate Period) and the results of transmission repayment studies. This Study outlines the policies, forecasts, assumptions, and calculations used to determine BPA's transmission revenue requirements. Legal requirements are summarized in Chapter 5 of this Study. The Revenue Requirement Study Documentation (Documentation), TR-06-FS-BPA-01A, contains key technical assumptions and calculations, the results of the transmission repayment studies, and a further explanation of the repayment inputs and its outputs.

  9. Corn Belt Power Cooperative Rebate Program

    Broader source: Energy.gov [DOE]

    Corn Belt Power Cooperative is a generation and transmission electric cooperative that provides power to nine distribution rural electric cooperatives and one municipal electric cooperative. These...

  10. PowerBeam Inc | Open Energy Information

    Open Energy Info (EERE)

    Product: PowerBeam holds the patent to a power transmission technology that produces wireless electricity. Coordinates: 32.780338, -96.547405 Show Map Loading map......

  11. Federal Power Act | Open Energy Information

    Open Energy Info (EERE)

    Regulatory commission) as the licensing authority certain interstate transmission and wholesale power sales and most hydroelectric power. Published NA Year Signed or Took Effect...

  12. United Power- Business Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    United Power, in conjunction with wholesale power supplier Tri-State Generation & Transmission (TSGT), offers rebates for the installation of a variety of commercial energy efficient equipment...

  13. EIS-0116-S1: Final Supplemental Environmental Impact Statement for the Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project, Grand and Summit Counties, Colorado

    Broader source: Energy.gov [DOE]

    This supplemental environmental impact statement by the Western Area Power Administration assesses the environmental effects of constructing, operating, and maintaining about 30 miles of 230/345-kV transmission line between the existing Gore Pass Substation northwest of Kremmling, Colorado, and a proposed new substation (not part of this action) near the Ute Pass Road. Alternatives assessed included routing and design alternatives plus the alternatives addressed in the Hayden-Blue River Final EIS, issued by the Rural Electrification Administration in July 1982 and adopted by DOE in June 1985 (see DOE/EIS-0116).

  14. Transmission Line Security Monitor

    ScienceCinema (OSTI)

    None

    2013-05-28

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  15. Transmission Line Security Monitor

    SciTech Connect (OSTI)

    2011-01-01

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  16. WINDExchange: Selling Wind Power

    Wind Powering America (EERE)

    Market Sectors Printable Version Bookmark and Share Utility-Scale Wind Distributed Wind Motivations for Buying Wind Power Buying Wind Power Selling Wind Power Selling Wind Power Owners of wind turbines interconnected directly to the transmission or distribution grid, or that produce more power than the host consumes, can sell wind power as well as other generation attributes. Wind-Generated Electricity Electricity generated by wind turbines can be used to cover on-site energy needs

  17. PP-13 Federal Power Commission | Department of Energy

    Office of Environmental Management (EM)

    3 Federal Power Commission PP-13 Federal Power Commission Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission ...

  18. PP-234 Baja California Power Inc | Department of Energy

    Energy Savers [EERE]

    234 Baja California Power Inc PP-234 Baja California Power Inc Presidential permit authorizing Baja California Power Inc to construct, operate, and maintain electric transmission ...

  19. Frequency Control Concerns in the North American Electric Power...

    Office of Scientific and Technical Information (OSTI)

    Control Concerns in the North American Electric Power System Kirby, B.J. 24 POWER TRANSMISSION AND DISTRIBUTION; EFFICIENCY; FREQUENCY CONTROL; MARKET; PERFORMANCE; POWER...

  20. October 1996 - September 2001 Wholesale Power Rates (rates/previous...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    affecting a specific power purchase. For more specific information see: 1996 Final Wholesale Power and Transmission Rate Schedules: Power Rates (PDF, 84 pages, 188 kb) Ancillary...

  1. Synthesis of carbon micro-rods via a solvothermal route

    SciTech Connect (OSTI)

    Mi Yuanzhu Hu Weibing; Dan Youmeng

    2009-04-02

    Novel carbon micro-rods with regular and uniform shape have been synthesized in high yield by magnesium acetate and n-butyl alcohol as the precursors via a solvothermal route. The resulting products were characterized by combined techniques including X-ray powder diffraction (XRD), scanning electron microscopy (SEM), transmission electron microscopy (TEM), energy-dispersive X-ray (EDX) and Raman spectroscopy. The carbon micro-rods exhibit diameters ranging from 500 nm to 1 {mu}m and up to 5-10 {mu}m in length. We have found that the optimal reaction conditions for the growth of the carbon micro-rods were 500 deg. C and 12 h.

  2. Comments of Lawrence J. Reilly Chairman, Vermont Electric Power...

    Broader source: Energy.gov (indexed) [DOE]

    nation's first statewide "transmission only" company in order to create and maintain an interconnected electric transmission grid capable of sharing access to clean hydro power. ...

  3. A novel solution-phase route for the synthesis of crystalline silver nanowires

    SciTech Connect (OSTI)

    Liu Yang; Chu Ying . E-mail: chuying@nenu.edu.cn; Yang Likun; Han Dongxue; Lue Zhongxian

    2005-10-06

    A unique solution-phase route was devised to synthesize crystal Ag nanowires with high aspect-ratio (8-10 nm in diameter and length up to 10 {mu}m) by the reduction of AgNO{sub 3} with Vitamin C in SDS/ethanol solution. The resultant nanoproducts were characterized by transmission electron microscope (TEM), X-ray diffraction (XRD) and electron diffraction (ED). A soft template mechanism was put forward to interpret the formation of metal Ag nanowires.

  4. A Versatile Synthetic Route for the Preparation of Titanium Metal...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A Versatile Synthetic Route for the Preparation of Titanium Metal-Organic Frameworks ... A Versatile Synthetic Route for the Preparation of Titanium Metal-Organic Frameworks. ...

  5. Innovative Nano-structuring Routes for Novel ThermoelectricMaterials...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nano-structuring Routes for Novel Thermoelectric Materials;Phonon Blocking & DOS Engineering Innovative Nano-structuring Routes for Novel Thermoelectric Materials;Phonon Blocking & ...

  6. TEC Working Group Topic Groups Routing Key Documents | Department...

    Office of Environmental Management (EM)

    Key Documents TEC Working Group Topic Groups Routing Key Documents KEY DOCUMENTS PDF icon Proposed Task Plan - Routing Topic Group More Documents & Publications TEC Working Group...

  7. TEC Working Group Topic Groups Routing Conference Call Summaries...

    Office of Environmental Management (EM)

    Routing Conference Call Summaries TEC Working Group Topic Groups Routing Conference Call Summaries CONFERENCE CALL SUMMARIES PDF icon January 31, 2008 PDF icon December 6, 2007 PDF...

  8. A Solution Route to Thermoelectric Oxide Nanoparticles - A Sol...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A Solution Route to Thermoelectric Oxide Nanoparticles - A Sol-Gel Process Employing Heterometallic Alkoxides A Solution Route to Thermoelectric Oxide Nanoparticles - A Sol-Gel ...

  9. New route toward integrating large nickel nanocrystals onto mesoporous...

    Office of Scientific and Technical Information (OSTI)

    New route toward integrating large nickel nanocrystals onto mesoporous carbons This content will become publicly available on December 30, 2016 Title: New route toward integrating ...

  10. Methods and systems for micro transmissions

    SciTech Connect (OSTI)

    Stalford, Harold L

    2014-12-23

    Methods and systems for micro transmissions for a micro machine may comprise an input shaft assembly coupled to a micro actuator, an output shaft assembly coupled to a micro shaft, and one or more power conversion elements operable to convert a first type of movement from the micro actuator into a second, disparate type of movement for the micro shaft.

  11. The power grid of the future is a platform that

    Energy Savers [EERE]

    in the substation automatically, automated feeder switches that re-route power around problems, and storage batteries that store excess energy and make it available later to the ...

  12. Down hole transmission system

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

    2007-07-24

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

  13. Downhole transmission system

    DOE Patents [OSTI]

    Hall, David R.; Fox, Joe

    2008-01-15

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

  14. Transmission Access Resources

    Broader source: Energy.gov [DOE]

    Historically, the addition of new electric generation facilities has been accompanied by new transmission systems. For example, large nuclear and coal plants built in the 1960s and 1970s required...

  15. Electric Transmission System Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System ... Can we agree on several key design attributes for the future grid? Taking Action in the ...

  16. Transmission Grid Integration

    Broader source: Energy.gov [DOE]

    The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

  17. Transmission Infrastructure Program

    Energy Savers [EERE]

    TRANSMISSION INFRASTRUCTURE PROGRAM DOE Tribal Energy Summit 2015 SECRETARYOF ENERGY'S FINANCING ROUNDTABLE Tracey A. LeBeau Senior Vice President & Transmission Infrastructure Program Manager 1 Program Description Western's Loan Authority * $3.25 billion permanent authority (revolving) * Goal: Attract investment in infrastructure & address market needs * Commercial underwriting standards TIP Portfolio Management Fundamentals * Reflective of Market Need(s) * Ensure Funds Revolve 2 Recent

  18. National transmission grid study

    SciTech Connect (OSTI)

    Abraham, Spencer

    2003-05-31

    The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE’s Policy Office Electricity Modeling System (POEMS). DOE’s analysis, presented in Section 2, confirms the central role of the nation’s transmission system in lowering costs to consumers through increased trade. More importantly, DOE’s analysis also confirms the results of previous studies, which show that transmission bottlenecks and related transmission system market practices are adding hundreds of millions of dollars to consumers’ electricity bills each year. A more detailed technical overview of the use of POEMS is provided in Appendix A. DOE led an extensive, open, public input process and heard a wide range of comments and recommendations that have all been considered.1 More than 150 participants registered for three public workshops held in Detroit, MI (September 24, 2001); Atlanta, GA (September 26, 2001); and Phoenix, AZ (September 28, 2001).

  19. GTT 2012 Transmission Workshop - Documents | Department of Energy

    Energy Savers [EERE]

    Transmission Workshop - Documents GTT 2012 Transmission Workshop - Documents Use the links below to download documents from the GTT's Transmission Workshop, held November 1-2, 2012 PDF icon Agenda PDF icon Roster of Attendees PDF icon Presentation - Overview - Anjan Bose, DOE PDF icon Presentation - EERE Issues and Opportunities - David Danielson, DOE PDF icon Presentation - Vision for the Future - Lauren Azar, DOE PDF icon Presentation - Tomorrow's Power System - Michael Heyeck, EPRI PDF icon

  20. Coordinating Interstate ElectricTransmission Siting: An Introduction to the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Debate | Department of Energy Coordinating Interstate ElectricTransmission Siting: An Introduction to the Debate Coordinating Interstate ElectricTransmission Siting: An Introduction to the Debate In recent years, experts have started drawing att ention to the need to improve the system that transmits electricity from power plants to demand centers. Congestion on existing lines, increased energy demand that suggests a need for new electric transmission and the challenge of connecting

  1. 2006 National Electric Transmission Congestion Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate

  2. 2009 National Electric Transmission Congestion Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate

  3. 2016 Tribal Energy and Economic Development March Webinar: Transmission and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grid Basics for Tribal Economic and Energy Development | Department of Energy March Webinar: Transmission and Grid Basics for Tribal Economic and Energy Development 2016 Tribal Energy and Economic Development March Webinar: Transmission and Grid Basics for Tribal Economic and Energy Development The U.S. Department of Energy (DOE) Office of Indian Energy, in partnership with Western Area Power Administration (Western), hosted a webinar on "Transmission and Grid Basics for Tribal Economic

  4. Transmission Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the

  5. EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western’s transmission system.

  6. ITC Transmission | Open Energy Information

    Open Energy Info (EERE)

    ITC Transmission Jump to: navigation, search Name: ITC Transmission Place: Michigan Phone Number: Western Michigan Office: (269) 792-7223 -- Northern Michigan Office: (989)...

  7. TEC Working Group Topic Groups Archives Route Identification Process |

    Office of Environmental Management (EM)

    Department of Energy Route Identification Process TEC Working Group Topic Groups Archives Route Identification Process Route Identification Process Items Available for Download PDF icon Routing Discussion Paper (April 1998) More Documents & Publications TEC Meeting Summaries - January 1997 TEC Meeting Summaries - July 1997 TEC Meeting Summaries - January 1998

  8. EIS-0005-S2: Bonneville Power Administration Proposed FY 1979 Program Facility Planning Supplement Southwest Oregon Area Service, Supplemental

    Broader source: Energy.gov [DOE]

    This statement, one of a series prepared by the U.S. Department of Energy’s Bonneville Power Administration on various facets of its construction and maintenance activities, addresses the potential impact of a major new facility proposed for fiscal year 1979. To allow power generated in Wyoming to be delivered to Southwest Oregon and to facilitate the exchange of electric power between the Pacific Northwest and the Middle Snake region, two basic plans of service, each with two corridor routing options, have been identified to meet system requirements. BPA proposes construction of the following two transmission facilities: (1) a 500-kV line from Idaho Power Company's Brownlee Substation in Idaho to BPA's Slatt Substation near Arlington, Oregon, and (2) a 500-kV line from Buckley (near Maupin, Oregon) to Malin, Oregon. This statement must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report (The ""Role EIS""), particularly Appendix B - BPA Power Transmission.

  9. EIS-0124: Conrad-Shelby Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

  10. EIS-0499: Great Northern Transmission Line Project, Minnesota

    Broader source: Energy.gov [DOE]

    This EIS will evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 883-megawatt electric transmission system across the U.S.-Canada border. The proposed 220 mile transmission line would cross the border near Roseau, Minnesota, and continue to Grand Rapids, Minnesota.

  11. An Indirect Route for Ethanol Production

    SciTech Connect (OSTI)

    Eggeman, T.; Verser, D.; Weber, E.

    2005-04-29

    The ZeaChem indirect method is a radically new approach to producing fuel ethanol from renewable resources. Sugar and syngas processing platforms are combined in a novel way that allows all fractions of biomass feedstocks (e.g. carbohydrates, lignins, etc.) to contribute their energy directly into the ethanol product via fermentation and hydrogen based chemical process technologies. The goals of this project were: (1) Collect engineering data necessary for scale-up of the indirect route for ethanol production, and (2) Produce process and economic models to guide the development effort. Both goals were successfully accomplished. The projected economics of the Base Case developed in this work are comparable to today's corn based ethanol technology. Sensitivity analysis shows that significant improvements in economics for the indirect route would result if a biomass feedstock rather that starch hydrolyzate were used as the carbohydrate source. The energy ratio, defined as the ratio of green energy produced divided by the amount of fossil energy consumed, is projected to be 3.11 to 12.32 for the indirect route depending upon the details of implementation. Conventional technology has an energy ratio of 1.34, thus the indirect route will have a significant environmental advantage over today's technology. Energy savings of 7.48 trillion Btu/yr will result when 100 MMgal/yr (neat) of ethanol capacity via the indirect route is placed on-line by the year 2010.

  12. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 20, 2015 Scott Carpenter Named Southwestern Administrator Scott Carpenter Scott Carpenter Administrator TULSA, OK - Scott Carpenter was named the new Administrator of the Southwestern Power Administration (Southwestern) in Tulsa, Oklahoma, on November 19, 2015. Mr. Carpenter has over 20 years of utility and architectural engineering consulting experience, including utility load and fuel price forecasting, transmission and generation planning, transmission congestion forecasting, and

  13. Prospects of development of the power industry in the zone of influence of the transcontinental railroad

    SciTech Connect (OSTI)

    Fel`dman, B.N.; Luk`yanov, V.A.

    1994-02-01

    The authors examine the possibilities of developing a power industry in the zone of influence of the transcontinental railroad (TCR). Two aspects of development are studied in particular: (1) the electric power supply for construction and subsequently for the operating railroad in coordination with simultaneous provision for the needs of adjacent regions; (2) the construction of a transcontinental transmission line with the use of a tunnel and railroad for its construction and with the creation of a unified transport--power corridor. Of great interest are the possibilities of constructing hydrostations in regions of the Sakha Republic (Yakutia), Chukchi Peninsula, and in the southern part of the Magadan region. The route of the proposed main line is located in the zone of influence of a number of prospective hydropower installations. 2 tabs.

  14. EIS-0106: Great Falls-Conrad Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

  15. Reduced Form of Detailed Modeling of Wind Transmission and Intermitten...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WinDS to calculate transmission distances, as well as the benefits of dispersed wind farms supplying power to a demand region. 3 Figure 2. Regions within WinDS As shown in...

  16. EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

  17. PowerPoint Presentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EN debt. <4 Adjusted Net Revenue is calculated by adding Power Services and Transmission Services Net Revenues. <5 Financial reserves consist of BPA cash, investments in U.S....

  18. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    SciTech Connect (OSTI)

    Mills, Andrew D.; Wiser, Ryan; Porter, Kevin

    2009-02-02

    The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS and WinDS). The authors and general location of the 40 detailed transmission studies included in our review are illustrated in Figure ES-1. As discussed in the body of the report, these studies vary considerably in scope, authorship, objectives, methodology, and tools. Though we recognize this diversity and are cognizant that comparisons among these studies are therefore somewhat inappropriate, we nonetheless emphasize such simple comparisons in this report. We do so in order to improve our understanding of the range of transmission costs needed to access greater quantities of wind, and to highlight some of the drivers of those costs. In so doing, we gloss over many important details and differences among the studies in our sample. In emphasizing simple comparisons, our analysis focuses primarily on the unit cost of transmission implied by each of the studies. The unit cost of transmission for wind in $/kW terms on a capacity-weighted basis is estimated by simply dividing the total transmission cost in a study by the total amount of incremental generation capacity (wind and non-wind) modeled in that study. In so doing, this metric assumes that within any individual study all incremental generation capacity imposes transmission costs in proportion to its nameplate capacity rating. The limitations to this approach are described in some detail in the body of the report.

  19. 2014 Transmission Reliability Program Peer Review - Day 2 Presentations |

    Energy Savers [EERE]

    Department of Energy 2 Presentations 2014 Transmission Reliability Program Peer Review - Day 2 Presentations The Transmission Reliability Program Peer Review included 6 sessions over 2 days on June 3- 4, 2014. Presentations from Day 2 (Sessions V and VI) are available below. Session V: Simon Mo (Electric Power Group), Jim Thorp (VA Tech), Scott Ghiocel (RPI), Dave Schoenwald (Sandia) Session VI: Bharat Bhargava (Electric Power Group), Brett Amidan (PNNL), Philip Irminger (ORNL) PDF icon 2014

  20. NREL: Transmission Grid Integration - Issues Affecting Renewable Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Integration Issues Affecting Renewable Energy Integration NREL is investigating issues related to the integration of renewable energy sources into the transmission system. Developing solutions to these challenges will enable higher penetrations of renewable generation sources on the electric power system and the future growth of renewable energy. The integration of large quantities of renewable energy sources such as wind and solar power will require changes in how our transmission system

  1. Integrated survey and design for transmission lines

    SciTech Connect (OSTI)

    Miller, M.A.; Simpson, K.D.

    1994-12-31

    Gathering and compiling information on the features and uses of the land within a proposed corridor provides the basis for selecting a route, obtaining easements, and designing and constructing a transmission line. Traditionally, gathering this information involved searches of existing maps and records to obtain the available information, which would then be supplemented with aerial photography to record current conditions. Ground surveys were performed to collect topographic data for design purposes. This information was manually transferred to drawings and other documents to show the terrain, environmentally sensitive areas, property ownership, and existing facilities. These drawing served as the base to which the transmission line right-of-way, structures, and other design information were added. As the design was completed, these drawings became the source of information for constructing the line and ultimately, the record of the facility. New technologies and the every growing need for instantly accessible information have resulted in changes in almost every step of gathering, storing and using information. Electronic data collection, global positioning systems (GPS), digitized terrain models, computerized design techniques, development of drawings using CAD, and graphical information systems (GIS) have individually resulted in significant advancements in this process. Combining these components into an integrated system, however, is truly revolutionizing transmission line engineering. This paper gives an overview of the survey and mapping information that is required for transmission line projects, review the traditional techniques that have been employed to obtain and utilize this information, and discuss the recent advances in the technology. Additionally, a system is presented that integrates the components in this process to achieve efficiency, minimize chances of errors, and provide improved access to project information.

  2. NREL: Transmission Grid Integration - Publications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study

  3. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

    1991-08-27

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

  4. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

    1991-01-01

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

  5. Device for adapting continuously variable transmissions to infinitely variable transmissions with forward-neutral-reverse capabilities

    DOE Patents [OSTI]

    Wilkes, Donald F.; Purvis, James W.; Miller, A. Keith

    1997-01-01

    An infinitely variable transmission is capable of operating between a maximum speed in one direction and a minimum speed in an opposite direction, including a zero output angular velocity, while being supplied with energy at a constant angular velocity. Input energy is divided between a first power path carrying an orbital set of elements and a second path that includes a variable speed adjustment mechanism. The second power path also connects with the orbital set of elements in such a way as to vary the rate of angular rotation thereof. The combined effects of power from the first and second power paths are combined and delivered to an output element by the orbital element set. The transmission can be designed to operate over a preselected ratio of forward to reverse output speeds.

  6. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1993-03-23

    A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  7. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

    1993-01-01

    A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  8. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

    1997-01-01

    A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

  9. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1997-03-25

    A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

  10. Central Wind Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities: Revised Edition

    SciTech Connect (OSTI)

    Rogers, J.; Porter, K.

    2011-03-01

    The report and accompanying table addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America. The first part of the table focuses on electric utilities and regional transmission organizations that have central wind power forecasting in place; the second part focuses on electric utilities and regional transmission organizations that plan to adopt central wind power forecasting in 2010. This is an update of the December 2009 report, NREL/SR-550-46763.

  11. Single transmission line data acquisition system

    DOE Patents [OSTI]

    Fasching, George E.

    1984-01-01

    A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

  12. Conductive Channel for Energy Transmission

    SciTech Connect (OSTI)

    Apollonov, Victor V. [A.M. Prokhorov General Physics Institute, Vavilov Str. 38, Moscow, 119991 (Russian Federation)

    2011-11-10

    For many years the attempts to create conductive channels of big length were taken in order to study the upper atmosphere and to settle special tasks, related to energy transmission. There upon the program of creation of 'Impulsar' represents a great interest, as this program in a combination with high-voltage high repetition rate electrical source can be useful to solve the above mentioned problems (N. Tesla ideas for the days of high power lasers). The principle of conductive channel production can be shortly described as follows. The 'Impulsar' - laser jet engine vehicle - propulsion take place under the influence of powerful high repetition rate pulse-periodic laser radiation. In the experiments the CO{sub 2}-laser and solid state Nd:YAG laser systems had been used. Active impulse appears thanks to air breakdown (<30 km) or to the breakdown of ablated material on the board (>30 km), placed in the vicinity of the focusing mirror-acceptor of the breakdown waves. With each pulse of powerful laser the device rises up, leaving a bright and dense trace of products with high degree of ionization and metallization by conductive nano-particles due to ablation. Conductive dust plasma properties investigation in our experiments was produced by two very effective approaches: high power laser controlled ablation and by explosion of wire. Experimental and theoretical results of conductive canal modeling will be presented. The estimations show that with already experimentally demonstrated figures of specific thrust impulse the lower layers of the Ionosphere can be reached in several ten seconds that is enough to keep the high level of channel conductivity and stability with the help of high repetition rate high voltage generator. Some possible applications for new technology are highlighted.

  13. Wind Integration, Transmission, and Resource Assessment and Characterization Projects, Fiscal Years 2006-2014

    SciTech Connect (OSTI)

    None, None

    2014-04-01

    This report covers the Wind and Water Power Technologies Office's Wind Integration, Transmission, and Resource Assessment and Characterization Projects from 2006 to 2014.

  14. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...

    Energy Savers [EERE]

    No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the...

  15. April 19 PSERC Webinar: Robust Transmission Planning Under Uncertain Generation Investment and Retirement

    Broader source: Energy.gov [DOE]

    The DOE-funded Power Systems Engineering Research Center (PSERC) is offering a free public webinar that will present a new robust optimization model for transmission planning.

  16. Hydraulic system for a ratio change transmission

    DOE Patents [OSTI]

    Kalns, Ilmars

    1981-01-01

    Disclosed is a drive assembly (10) for an electrically powered vehicle (12). The assembly includes a transaxle (16) having a two-speed transmission (40) and a drive axle differential (46) disposed in a unitary housing assembly (38), an oil-cooled prime mover or electric motor (14) for driving the transmission input shaft (42), an adapter assembly (24) for supporting the prime mover on the transaxle housing assembly, and a hydraulic system (172) providing pressurized oil flow for cooling and lubricating the electric motor and transaxle and for operating a clutch (84) and a brake (86) in the transmission to shift between the two-speed ratios of the transmission. The adapter assembly allows the prime mover to be supported in several positions on the transaxle housing. The brake is spring-applied and locks the transmission in its low-speed ratio should the hydraulic system fail. The hydraulic system pump is driven by an electric motor (212) independent of the prime mover and transaxle.

  17. Greg Rutherford Executive Director Global Power & Utilities Investment...

    Broader source: Energy.gov (indexed) [DOE]

    Rutherford Executive Director Global Power & Utilities Investment Banking Morgan Stanley Bankability of Electricity Transmission, Storage and Distribution Infrastructure Investment...

  18. The Applied Mathematics for Power Systems (AMPS) (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    ... Subject: 24 POWER TRANSMISSION AND DISTRIBUTION; 99 GENERAL AND MISCELLANEOUSMATHEMATICS, COMPUTING, AND INFORMATION SCIENCE; 97 MATHEMATICAL METHODS AND COMPUTING; ALGORITHMS; ...

  19. CDX 4608, Guard Tower Power and Fiber Reroute (4608)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Guard Tower Power and Fiber Reroute (4608) Y-12 Site Office Oak Ridge, Anderson County, Tennessee The proposed action is to design and re-route power and fiber to 9949-AR (Guard...

  20. Transmission and Storage Operations

    Energy Savers [EERE]

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014 Agenda * DTE Gas Snapshot * NOx & CO - Combustion stability * Methane - Packing - Blowdowns * Capture vs Flare 2 SNAPSHOT * DTE Gas - 41 Units * Age Range: 8-59yrs (Average 45yrs) - 118,200HP * 1,000-15,000HP - 7 different manufacturers * Cooper-Bessemer, Solar, Waukesha, DeLaval, IR, CAT, Ariel - Complete Mixture *

  1. Appendix TFIELD: Transmissivity Fields

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Appendix TFIELD-2014 Transmissivity Fields United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Appendix TFIELD-2014 Table of Contents TFIELD-1.0 Overview of the T-field Development, Calibration, and Mining Modification Process TFIELD-2.0 Geologic Data TFIELD-2.1 Culebra Hydrogeologic Setting TFIELD-2.2 Refinement of Geologic Boundaries TFIELD-2.2.1 Rustler Halite Margins TFIELD-2.2.2 Salado

  2. PP-64 Basin Electric Power Cooperative | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Basin Electric Power Cooperative to construct, operate, and maintain transmission facilities at the U.S. - Canada Border. PDF icon PP-64 Basin Electric Power Cooperative More ...

  3. PP-231 Northern States Power Company | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Northern States Power Company to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border. PDF icon PP-231 Northern States Power Company More ...

  4. PP-43 Maine Electric Power Company, Inc. | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Maine Electric Power Company, Inc. to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PDF icon PP-43 Maine Electric Power Company, ...

  5. PP-78 Minnesota Power & Light Company | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Minnesota Power & Light Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PDF icon PP-78 Minnesota Power & Light Company ...

  6. Shanghai Municipal Electric Power Company SMEPC | Open Energy...

    Open Energy Info (EERE)

    Shanghai Municipal Electric Power Company is a large enterprise engaging in Shanghai electric power transmission, distribution and sales. Coordinates: 31.247709,...

  7. Planar Optical Waveguide Coupler Transformers for High-Power...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planar Optical Waveguide Coupler Transformers for High-Power Solar Enegy Collection and Transmission Planar Optical Waveguide Coupler Transformers for High-Power Solar Enegy ...

  8. NIST cooperative laboratory for OSI routing technology

    SciTech Connect (OSTI)

    Montgomery, D.

    1994-05-23

    This document is one of two reports on the Integrated ISIS protocol. Required by the IAB/IESG in order for an Internet routing protocol to advance to Draft Standard Status. Integrated ISIS is an Interior Gateway Protocol and is designed to carry both IP and ISO CLNP routing information. Integrated ISIS is currently designated as a Proposed Standard. The protocol was first published in RFC 1195. Internet Draft was published subsequently to RFC 1195 and documents the current version of the protocol. This report documents experience with Integrated ISIS. This includes reports on interoperability testing, field experience and the current state of Integrated ISIS implementations. It also presents a summary of the Integrated ISIS Management Information Base (MIB), and a summary of the Integrated ISIS authentication mechanism.

  9. DOE HQ Shuttle Bus Schedule and Route | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Shuttle Bus Schedule and Route DOE HQ Shuttle Bus Schedule and Route The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. The shuttle bus departure and arrival times may be impacted by traffic, weather, or other logistical interruptions.

  10. Charting a New Carbon Route to Development | Open Energy Information

    Open Energy Info (EERE)

    www.beta.undp.orgcontentundpenhomeourworkenvironmentandenergyfo Cost: Free Language: English Charting a New Carbon Route to Development Screenshot "UNDP recognizes the...

  11. National Electric Transmission Congestion Study

    Energy Savers [EERE]

    Electric Transmission Congestion Study September 2015 United States Department of Energy Washington, DC 20585 U.S. Department of Energy | September 2015 National Electric Transmission Congestion Study | Page i Message from the Secretary In this study, the U.S. Department of Energy (DOE, the Department) seeks to provide information about transmission congestion by focusing on specific indications of transmission constraints and congestion and their consequences. The study focuses primarily on a

  12. Geothermal Resources and Transmission Planning

    Broader source: Energy.gov [DOE]

    This project addresses transmission-related barriers to utility-scale deployment of geothermal electric generation technologies.

  13. EIS-0011: New Melones 230-kV Electrical Transmission Line, Central Valley Project, California

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Western Area Power Administration prepared this statement to evaluate the environmental impacts of proposed development of an electrical transmission system for the New Melones Power Plant.

  14. A simple route to synthesize manganese germanate nanorods

    SciTech Connect (OSTI)

    Pei, L.Z. Yang, Y.; Yuan, C.Z.; Duan Taike; Zhang Qianfeng

    2011-06-15

    Manganese germanate nanorods have been synthesized by a simple route using germanium dioxide and manganese acetate as the source materials. X-ray diffraction observation shows that the nanorods are composed of orthorhombic and monoclinic manganese germanate phases. Scanning electron microscopy and transmission electron microscopy observations display that the manganese germanate nanorods have flat tips with the length of longer than 10 micrometers and diameter of 60-350 nm, respectively. The role of the growth conditions on the formation of the manganese germanate nanorods shows that the proper selection and combination of the growth conditions are the key factor for controlling the formation of the manganese germanate nanorods. The photoluminescence spectrum of the manganese germanate nanorods exhibits four fluorescence emission peaks centered at 422 nm, 472 nm, 487 nm and 530 nm showing the application potential for the optical devices. - Research Highlights: {yields} Manganese germanate nanorods have been synthesized by simple hydrothermal process. {yields} The formation of manganese germanate nanorods can be controlled by growth conditions. {yields} Manganese germanate nanorods exhibit good PL emission ability for optical device.

  15. UTILITIES COLORADO WESTERN POWER ADMIN POC Cheryl Drake Telephone

    Energy Savers [EERE]

    UTILITIES COLORADO WESTERN POWER ADMIN POC Cheryl Drake Telephone (720) 962-7154 Email drake@wapa.gov Electric Bulk Power Transmission and Control 221121 Electric Power Distribution 221122 GEORGIA SOUTHEASTERN POWER ADMIN POC Ann Craft Telephone (706) 213-3823 Email annc@sepa.doe.gov Electric Bulk Power Transmission and Control 221121 Electric Power Distribution 221122 OKLAHOMA SOUTHWESTERN POWER ADMIN POC Gary Bridges Telephone (918) 595-6671 Email gary.bridges@swpa.gov Electric Bulk Power

  16. Electricity Transmission, A Primer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system, the economics, and the policies. PDF icon Electricity Transmission, A Primer More Documents & Publications Draft Chapter 4: Transmission Adequacy Chapter 4 Transmission Adequacy Electricity Grid Basics Webinar Presentation Slides and Text Version

  17. Colorado Electrical Transmission Grid

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2012-02-01

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Xcel Energy Publication Date: 2012 Title: Colorado XcelEnergy NonXcel Transmission Network Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains transmission network of Colorado Spatial Domain: Extent: Top: 4540689.017558 m Left: 160606.141934 m Right: 758715.946645 m Bottom: 4098910.893397m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shapefile

  18. PP-6 Puget Sound Power & Light Company

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing Puget Sound Power & Light Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. - Signed 4/28/1981

  19. PP-62 Central Maine Power Company

    Broader source: Energy.gov [DOE]

    Presidential Permit authorizing Central Maine Power Company to construct, operate, and maintain transmission facilities at the U.S. -Ca nada Border.

  20. Categorical Exclusion Determinations: Bonneville Power Administration...

    Energy Savers [EERE]

    Power Administration July 9, 2015 CX-013781: Categorical Exclusion Determination Acquisition of Multiple Access Road Easements for the Holcomb-Naselle No. 1 Transmission Line ...

  1. Bonneville Power Administration Midway-Moxee Rebuild

    Energy Savers [EERE]

    Bonneville Power Administration 1 Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line Project ... does not currently hold easements. Although some crops ...

  2. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to maintain reliable transmission service at low rates and meet growing demands for electricity. Over the past several years, numerous power generation projects, including large...

  3. Chapter 4 Transmission Adequacy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is ...

  4. RAPID/Bulk Transmission | Open Energy Information

    Open Energy Info (EERE)

    Page Edit History RAPIDBulk Transmission < RAPID(Redirected from RAPIDOverviewBulkTransmission) Redirect page Jump to: navigation, search REDIRECT RAPIDBulkTransmission...

  5. Bordertown to California Transmission | Open Energy Information

    Open Energy Info (EERE)

    Transmission EIS Bordertown to California 120kV Transmission Line Project Environmental Impact Statement General NEPA Document Info Energy Sector Transmission Environmental...

  6. Electricity Transmission, A Primer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the...

  7. Value-based reliability transmission planning

    SciTech Connect (OSTI)

    Dalton, J.G. III; Garrison, D.L.; Fallon, C.M.

    1996-08-01

    This paper presents a new value-based reliability planning (VBRP) process proposed for planning Duke Power Company`s (DPC) regional transmission system. All transmission served customers are fed from DPC`s regional transmission system which consists of a 44-kV predominantly radial system and a 100-kV predominantly non-radial system. In the past, any single contingency that could occur during system peak conditions and cause a thermal overload required the overloaded facility to be upgraded, regardless of the costs or the likelihood of the overload occurring. The new VBRP process is based on transmission system reliability evaluation and includes the following important elements: (1) a ten-year historical data base describing the probabilities of forced outages for lines and transformers; (2) a five-year average load duration curve describing the probability of an overload should a contingency occur; (3) a customer outage cost data base; (4) and probabilistic techniques. The new process attempts to balance the costs of improving service reliability with the benefits or value that these improvements bring to these customers. The objective is to provide the customers their required level of reliability while minimizing the Total Cost of their electric service.

  8. EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management and the U.S. Forest Service are preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct about 305 miles of 500-kV transmission line from northeast Oregon to southwest Idaho. BPA’s proposed action is to partially fund part the transmission line.

  9. May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission

    Energy Savers [EERE]

    Planning Efforts | Department of Energy May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 24, 2013 - 3:41pm Addthis The U.S. Department of Energy Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series

  10. 2015 Transmission Reliability Program Peer Review - Day 2 Presentations |

    Energy Savers [EERE]

    Department of Energy 2 Presentations 2015 Transmission Reliability Program Peer Review - Day 2 Presentations The 2015 Transmission Reliability Program Peer Review included 8 sessions over 2 days on June 10 - 11, 2015, in Washington, DC. Presentations from Day 2 (Sessions V through VIII) are available below. Session V: Alejandro Dominguez-Garcia/Pete Sauer (U Illinois), Carlos Martinez (ASR), Song Xue (Electric Power Group) Session VI: Pavel Etingov (PNNL, two presentations), Bharat Bhargava

  11. EIS-0451: Hooper Springs Transmission Project, Caribou County, Idaho

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line from BPA's proposed Hooper Springs Substation near Soda Springs, Idaho, to either an existing Lower Valley Energy (LVE) substation or a proposed BPA connection with LVE's existing transmission system in northeastern Caribou County. Additional information is available at http://efw.bpa.gov/environmental_services/Document_Library/HooperSprings/.

  12. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SWPA Crime Witness Program 918-728-5742 Crime Witness Program Southwestern needs your help. Because much of our electrical transmission lines and equipment is located in secluded, rural areas, we need help protecting it from crimes such as: Shooting at Southwestern's insulators, power lines, transmission towers, or substation equipment Dumping waste or other materials on Southwestern property Vandalizing Southwestern's property, buildings, or vehicles Stealing Southwestern's equipment, supplies,

  13. Dynamic Transmission Electron Microscopy

    SciTech Connect (OSTI)

    Evans, James E.; Jungjohann, K. L.; Browning, Nigel D.

    2012-10-12

    Dynamic transmission electron microscopy (DTEM) combines the benefits of high spatial resolution electron microscopy with the high temporal resolution of ultrafast lasers. The incorporation of these two components into a single instrument provides a perfect platform for in situ observations of material processes. However, previous DTEM applications have focused on observing structural changes occurring in samples exposed to high vacuum. Therefore, in order to expand the pump-probe experimental regime to more natural environmental conditions, in situ gas and liquid chambers must be coupled with Dynamic TEM. This chapter describes the current and future applications of in situ liquid DTEM to permit time-resolved atomic scale observations in an aqueous environment, Although this chapter focuses mostly on in situ liquid imaging, the same research potential exists for in situ gas experiments and the successful integration of these techniques promises new insights for understanding nanoparticle, catalyst and biological protein dynamics with unprecedented spatiotemporal resolution.

  14. Articles about Grid Integration and Transmission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grid Integration and Transmission Articles about Grid Integration and Transmission RSS Below are stories about grid integration and transmission featured by the U.S. Department of Energy (DOE) Wind Program. March 28, 2016 DOE's 1.5-MW wind turbine at the National Wind Technology Center is being used to demonstrate that wind farms can provide the frequency-responsive back-up or "ancillary services" currently supplied to the electrical grid by conventional power plants. (Photo by Dennis

  15. The makings of a regional transmission group

    SciTech Connect (OSTI)

    Peterson, H.

    1994-04-15

    The Southwest Regional Transmission Association (SWRTA) plans to file this month at the Federal Energy Regulatory Commission (FERC) for recognition as a regional transmission group (RTG), pursuant to the FERC's July 1993 policy statement on RTGs. As the provision of electricity becomes less regulated and more competitive, many industry observers expect RTGs to play a key role in increasing the efficiency of our nation's electricity supply system. What exactly is an RTG There are as many definitions as there are interested parties. SWRTA's working group has spent over two years turning an idea into an RTG. Along the way they have learned a few important things about the FERC, congressional intent, the amended Federal Power Act, the dynamics of large groups, and fairness. This article describes the creation of the SWRTA RTG.

  16. Power line detection system

    DOE Patents [OSTI]

    Latorre, V.R.; Watwood, D.B.

    1994-09-27

    A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard. 4 figs.

  17. Power line detection system

    DOE Patents [OSTI]

    Latorre, Victor R.; Watwood, Donald B.

    1994-01-01

    A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard.

  18. Transmission Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system

  19. 2012 National Electric Transmission Congestion Study: Presentation...

    Energy Savers [EERE]

    2012 National Electric Transmission Congestion Study: Presentation from Congestion Study Webinar Series 2012 National Electric Transmission Congestion Study: Presentation from...

  20. Vice President, Transmission System Operations

    Broader source: Energy.gov [DOE]

    The VP for Transmission System Operations provides strategic leadership, direction, and oversight of the people, business processes, and systems that are responsible for the safe, reliable, and...

  1. AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION

    Broader source: Energy.gov [DOE]

    The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

  2. DOE Electricity Transmission System Workshop

    Broader source: Energy.gov (indexed) [DOE]

    ... Activities can span from basic R&D through demonstration projects. Parallel Breakout Sessions (see white paper: "DOE Action Plan Addressing the Electricity Transmission System") ...

  3. Transmission Expansion in the Midwest

    Broader source: Energy.gov [DOE]

    At this unique forum, participants will hear top executives from the area's RTOs, utilities, transmission developers, and state regulatory agencies discuss and debate the most critical issues...

  4. Small passenger car transmission test: Chevrolet Luv transmission

    SciTech Connect (OSTI)

    Bujold, M.P.

    1980-06-01

    The small passenger car transmission test was initiated to supply electric vehicle manufacturers with technical information regarding the performance of commercially available transmissions. This information would enable EV manufacturers to design a more energy efficient vehicle. With this information the manufacturers would be able to estimate vehicle driving range as well as speed and torque requirements for specific roadload performance characteristics. This report covers the 1978 Chevrolet Luv Truck manual transmission. This transmission was tested per a passenger car automatic transmission test code (SAE J65lb) which required drive performance, coast performance, and no load test conditions. The portion of the test code which involved the throttle valve modulation and line pressure were deleted since they did not apply to the manual transmission. Under these test conditions the transmission attained maximum efficiencies in the upper 90% range at rated load for both drive performance tests and coast performance tests. The major results of this test are the torque speed and efficiency curves which are located in the data section of this report. These graphs map the complete performance characteristics for the Chevrolet Luv Truck Manual transmission. This information will facilitate the vehicle manufacturer in the design of a more energy efficient vehicle.

  5. Thermoelectric Applications to Truck Essential Power

    SciTech Connect (OSTI)

    John C. Bass; Norbert B. Elsner

    2001-12-12

    The subjects covered in this report are: thermoelectrics, 1-kW generator for diesel engine; self-powered heater; power for wireless data transmission; and quantum-well thermoelectrics.

  6. NWTC Transmission and Grid Integration (Revised) (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-04-01

    The rapid growth of alternative power sources, especially wind power, is creating challenges that affect the existing electric grid. To keep up with this rapid growth, researchers in the Transmission and Grid Integration Group provide scientific, engineering, and analytical expertise to help advance alternative energy and accelerate its integration into the nation's electrical grid. For example, we evaluate U.S. wind energy resources and collect and analyze data about the impact of wind development on the electrical grid. Researchers in the Transmission and Grid Integration Group offer assistance to utility industry partners in the following integration areas.

  7. EC Transmission Line Materials

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-05-01

    The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

  8. DOE HQ Shuttle Bus Route and Schedule, April 2016

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April, 2016 DOE HQ Shuttle Bus Route and Schedule The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. Headquarters employees are reminded of the statutory provisions that authorize and limit the use of the shuttle bus service. Specific

  9. Transportation Routing Analysis Geographic Information System (TRAGIS) User's Manual

    SciTech Connect (OSTI)

    Johnson, PE

    2003-09-18

    The Transportation Routing Analysis Geographic Information System (TRAGIS) model is used to calculate highway, rail, or waterway routes within the United States. TRAGIS is a client-server application with the user interface and map data files residing on the user's personal computer and the routing engine and network data files on a network server. The user's manual provides documentation on installation and the use of the many features of the model.

  10. Cost-Effective Fabrication Routes for the Production of Quantum...

    Broader source: Energy.gov (indexed) [DOE]

    Cost-Effective Fabrication Routes for the Productionof Quantum-Well-Type Structures and Recovoery of Waste Heat from Heavy-Duty Trucks Thermoelectric Developments for Vehicular ...

  11. Photochemical route to actinide-transition metal bonds: synthesis...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Photochemical route to actinide-transition metal bonds: synthesis, characterization and reactivity of a series of thorium and uranium heterobimetallic complexes ...

  12. Bolivia-Brazil gas line route detailed

    SciTech Connect (OSTI)

    Not Available

    1992-05-11

    This paper reports that state oil companies of Brazil and Bolivia have signed an agreement outlining the route for a 2,270 km pipeline system to deliver natural gas from Bolivian fields to Southeast Brazil. The two sides currently are negotiating details about construction costs as well as contract volumes and prices. Capacity is projected at 283-565 MMcfd. No official details are available, but Roberto Y. Hukai, a director of the Sao Paulo engineering company Jaako Poyry/Technoplan, estimates transportation cost of the Bolivian gas at 90 cents/MMBTU. That would be competitive with the price of gas delivered to the Sao Paulo gas utility Comgas, he the. Brazil's Petroleos Brasileiro SA estimates construction of the pipeline on the Brazilian side alone with cost $1.2-1.4 billion. Bolivia's Yacimientos Petroliferos Fiscales Bolivianos (YPFB) is negotiating with private domestic and foreign investors for construction of the Bolivian portion of the project.

  13. Identification and definition of unbundled electric generation and transmission services

    SciTech Connect (OSTI)

    Kirby, B.; Hirst, E.; Vancoevering, J.

    1995-03-01

    State and federal regulators, private and public utilities, large and small customers, power brokers and marketers, and others are engaged in major debates about the future structure of the electric industry. Although the outcomes are far from certain, it seems clear that customers will have much greater choices about the electric services they purchase and from whom they buy these services. This report examines the ``ancillary`` services that are today buried within the typical vertically integrated utility. These ancillary services support and make possible the provision of the basic services of generating capacity, energy supply, and power delivery. These ancillary services include: Management of generating units; reserve generating capacity to follow variations in customer loads, to provide capacity and energy when generating units or transmission lines suddenly fall, to maintain electric-system stability, and to provide local-area security; transmission-system monitoring and control; replacement of real power and energy losses; reactive-power management and voltage regulation; transmission reserves; repair and maintenance of the transmission network; metering, billing, and communications; and assurance of appropriate levels of power quality. Our focus in this report, the first output from a larger Oak Ridge National Laboratory project, is on identification and definition of these services. Later work in this project will examine more closely the costs and pricing options for each service.

  14. PP-190 Niagara Mohawk Power Corporation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    190 Niagara Mohawk Power Corporation PP-190 Niagara Mohawk Power Corporation Presidential permit authorizing Niagara Mohawk Power Corporation to construct, operate, and maintain electric transmission facilitates at the U.S-Canadian border. PDF icon PP-190 Niagara Mohawk Power Corporation More Documents & Publications PP-230-2 International Transmission Company Proposed Open Access Requirement for International Electric Transmission Facilities and Delegation to the Federal Energy Regulatory

  15. Wireless Sensor Network for Electric Transmission Line Monitoring

    SciTech Connect (OSTI)

    Alphenaar, Bruce

    2009-06-30

    Generally, federal agencies tasked to oversee power grid reliability are dependent on data from grid infrastructure owners and operators in order to obtain a basic level of situational awareness. Since there are many owners and operators involved in the day-to-day functioning of the power grid, the task of accessing, aggregating and analyzing grid information from these sources is not a trivial one. Seemingly basic tasks such as synchronizing data timestamps between many different data providers and sources can be difficult as evidenced during the post-event analysis of the August 2003 blackout. In this project we investigate the efficacy and cost effectiveness of deploying a network of wireless power line monitoring devices as a method of independently monitoring key parts of the power grid as a complement to the data which is currently available to federal agencies from grid system operators. Such a network is modeled on proprietary power line monitoring technologies and networks invented, developed and deployed by Genscape, a Louisville, Kentucky based real-time energy information provider. Genscape measures transmission line power flow using measurements of electromagnetic fields under overhead high voltage transmission power lines in the United States and Europe. Opportunities for optimization of the commercial power line monitoring technology were investigated in this project to enable lower power consumption, lower cost and improvements to measurement methodologies. These optimizations were performed in order to better enable the use of wireless transmission line monitors in large network deployments (perhaps covering several thousand power lines) for federal situational awareness needs. Power consumption and cost reduction were addressed by developing a power line monitor using a low power, low cost wireless telemetry platform known as the ''Mote''. Motes were first developed as smart sensor nodes in wireless mesh networking applications. On such a platform, it has been demonstrated in this project that wireless monitoring units can effectively deliver real-time transmission line power flow information for less than $500 per monitor. The data delivered by such a monitor has during the course of the project been integrated with a national grid situational awareness visualization platform developed by Oak Ridge National Laboratory. Novel vibration energy scavenging methods based on piezoelectric cantilevers were also developed as a proposed method to power such monitors, with a goal of further cost reduction and large-scale deployment. Scavenging methods developed during the project resulted in 50% greater power output than conventional cantilever-based vibrational energy scavenging devices typically used to power smart sensor nodes. Lastly, enhanced and new methods for electromagnetic field sensing using multi-axis magnetometers and infrared reflectometry were investigated for potential monitoring applications in situations with a high density of power lines or high levels of background 60 Hz noise in order to isolate power lines of interest from other power lines in close proximity. The goal of this project was to investigate and demonstrate the feasibility of using small form factor, highly optimized, low cost, low power, non-contact, wireless electric transmission line monitors for delivery of real-time, independent power line monitoring for the US power grid. The project was divided into three main types of activity as follows; (1) Research into expanding the range of applications for non-contact power line monitoring to enable large scale low cost sensor network deployments (Tasks 1, 2); (2) Optimization of individual sensor hardware components to reduce size, cost and power consumption and testing in a pilot field study (Tasks 3,5); and (3) Demonstration of the feasibility of using the data from the network of power line monitors via a range of custom developed alerting and data visualization applications to deliver real-time information to federal agencies and others tasked with grid reliability (Tasks 6,8).

  16. Electric and magnetic field reduction by alternative transmission line options

    SciTech Connect (OSTI)

    Stewart, J.R. (Power Technologies, Inc., Schenectady, NY (United States)); Dale, S.J. (Oak Ridge National Lab., TN (United States)); Klein, K.W. (Energetics, Inc., Columbia, MD (United States))

    1991-01-01

    Ground level electric, and more recently magnetic, fields from overhead power transmission lines are increasingly important considerations in right of way specification, with states setting or planning to set edge of right of way limits. Research has been conducted in high phase order power transmission wherein six of twelve phases are used to transmit power in less physical space and with reduced electrical environmental effects than conventional designs. The first magnetic field testing, as reported in this paper, has verified predictive methods for determination of magnetic fields from high phase order lines. Based on these analytical methods, field profiles have been determined for lines of different phase order of comparable power capacity. Potential advantages of high phase order as a means of field mitigation are discussed. 10 refs., 12 figs., 3 tabs.

  17. Photonic surfaces for designable nonlinear power shaping

    SciTech Connect (OSTI)

    Biswas, Roshni Povinelli, Michelle L.

    2015-02-09

    We propose a method for designing nonlinear input-output power response based on absorptive resonances of nanostructured surfaces. We show that various power transmission trends can be obtained by placing a photonic resonance mode at the appropriate detuning from the laser wavelength. We demonstrate our results in a silicon photonic crystal slab at a laser wavelength of 808 nm. We quantify the overall spectral red shift as a function of laser power. The shift results from absorptive heating and the thermo-optic effect. We then demonstrate devices with increasing, decreasing, and non-monotonic transmission as a function of laser power. The transmission changes are up to 7.5 times larger than in unpatterned silicon. The strong nonlinear transmission is due to a combination of resonantly enhanced absorption, reduced thermal conductivity, and the resonant transmission lineshape. Our results illustrate the possibility of designing different nonlinear power trends within a single materials platform at a given wavelength of interest.

  18. Single transmission line interrogated multiple channel data acquisition system

    DOE Patents [OSTI]

    Fasching, George E. (Morgantown, WV); Keech, Jr., Thomas W. (Morgantown, WV)

    1980-01-01

    A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensor circuits each monitors a specific process variable and each transmits measurement values over a single transmission line to a master interrogating station when addressed by said master interrogating station. Typically, as many as 330 remote stations may be parallel connected to the transmission line which may exceed 7,000 feet. The interrogation rate is typically 330 stations/second. The master interrogating station samples each station according to a shared, charging transmit-receive cycle. All remote station address signals, all data signals from the remote stations/sensors and all power for all of the remote station/sensors are transmitted via a single continuous terminated coaxial cable. A means is provided for periodically and remotely calibrating all remote sensors for zero and span. A provision is available to remotely disconnect any selected sensor station from the main transmission line.

  19. Pulse transmission transmitter including a higher order time derivate filter

    DOE Patents [OSTI]

    Dress, Jr., William B.; Smith, Stephen F.

    2003-09-23

    Systems and methods for pulse-transmission low-power communication modes are disclosed. A pulse transmission transmitter includes: a clock; a pseudorandom polynomial generator coupled to the clock, the pseudorandom polynomial generator having a polynomial load input; an exclusive-OR gate coupled to the pseudorandom polynomial generator, the exclusive-OR gate having a serial data input; a programmable delay circuit coupled to both the clock and the exclusive-OR gate; a pulse generator coupled to the programmable delay circuit; and a higher order time derivative filter coupled to the pulse generator. The systems and methods significantly reduce lower-frequency emissions from pulse transmission spread-spectrum communication modes, which reduces potentially harmful interference to existing radio frequency services and users and also simultaneously permit transmission of multiple data bits by utilizing specific pulse shapes.

  20. Great Plains Wind Energy Transmission Development Project

    SciTech Connect (OSTI)

    Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

    2012-06-09

    In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

  1. On-chip electrically controlled routing of photons from a single quantum dot

    SciTech Connect (OSTI)

    Bentham, C.; Coles, R. J.; Royall, B.; O'Hara, J.; Prtljaga, N.; Fox, A. M.; Skolnick, M. S.; Wilson, L. R.; Itskevich, I. E.; Clarke, E.

    2015-06-01

    Electrical control of on-chip routing of photons emitted by a single InAs/GaAs self-assembled quantum dot (SAQD) is demonstrated in a photonic crystal cavity-waveguide system. The SAQD is located inside an H1 cavity, which is coupled to two photonic crystal waveguides. The SAQD emission wavelength is electrically tunable by the quantum-confined Stark effect. When the SAQD emission is brought into resonance with one of two H1 cavity modes, it is preferentially routed to the waveguide to which that mode is selectively coupled. This proof of concept provides the basis for scalable, low-power, high-speed operation of single-photon routers for use in integrated quantum photonic circuits.

  2. System for computer controlled shifting of an automatic transmission

    DOE Patents [OSTI]

    Patil, Prabhakar B.

    1989-01-01

    In an automotive vehicle having an automatic transmission that driveably connects a power source to the driving wheels, a method to control the application of hydraulic pressure to a clutch, whose engagement produces an upshift and whose disengagement produces a downshift, the speed of the power source, and the output torque of the transmission. The transmission output shaft torque and the power source speed are the controlled variables. The commanded power source torque and commanded hydraulic pressure supplied to the clutch are the control variables. A mathematical model is formulated that describes the kinematics and dynamics of the powertrain before, during and after a gear shift. The model represents the operating characteristics of each component and the structural arrangement of the components within the transmission being controlled. Next, a close loop feedback control is developed to determine the proper control law or compensation strategy to achieve an acceptably smooth gear ratio change, one in which the output torque disturbance is kept to a minimum and the duration of the shift is minimized. Then a computer algorithm simulating the shift dynamics employing the mathematical model is used to study the effects of changes in the values of the parameters established from a closed loop control of the clutch hydraulic and the power source torque on the shift quality. This computer simulation is used also to establish possible shift control strategies. The shift strategies determine from the prior step are reduced to an algorithm executed by a computer to control the operation of the power source and the transmission.

  3. Closed loop computer control for an automatic transmission

    DOE Patents [OSTI]

    Patil, Prabhakar B.

    1989-01-01

    In an automotive vehicle having an automatic transmission that driveably connects a power source to the driving wheels, a method to control the application of hydraulic pressure to a clutch, whose engagement produces an upshift and whose disengagement produces a downshift, the speed of the power source, and the output torque of the transmission. The transmission output shaft torque and the power source speed are the controlled variables. The commanded power source torque and commanded hydraulic pressure supplied to the clutch are the control variables. A mathematical model is formulated that describes the kinematics and dynamics of the powertrain before, during and after a gear shift. The model represents the operating characteristics of each component and the structural arrangement of the components within the transmission being controlled. Next, a close loop feedback control is developed to determine the proper control law or compensation strategy to achieve an acceptably smooth gear ratio change, one in which the output torque disturbance is kept to a minimum and the duration of the shift is minimized. Then a computer algorithm simulating the shift dynamics employing the mathematical model is used to study the effects of changes in the values of the parameters established from a closed loop control of the clutch hydraulic and the power source torque on the shift quality. This computer simulation is used also to establish possible shift control strategies. The shift strategies determined from the prior step are reduced to an algorithm executed by a computer to control the operation of the power source and the transmission.

  4. Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions

    Broader source: Energy.gov [DOE]

    Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed that gap in recent...

  5. Fiber optically isolated and remotely stabilized data transmission system

    DOE Patents [OSTI]

    Nelson, Melvin A.

    1992-01-01

    A fiber optically isolated and remotely stabilized data transmission system s described wherein optical data may be transmitted over an optical data fiber from a remote source which includes a data transmitter and a power supply at the remote source. The transmitter may be remotely calibrated and stabilized via an optical control fiber, and the power source may be remotely cycled between duty and standby modes via an optical control fiber.

  6. Fiber optically isolated and remotely stabilized data transmission system

    DOE Patents [OSTI]

    Nelson, M.A.

    1992-11-10

    A fiber optically isolated and remotely stabilized data transmission systems described wherein optical data may be transmitted over an optical data fiber from a remote source which includes a data transmitter and a power supply at the remote source. The transmitter may be remotely calibrated and stabilized via an optical control fiber, and the power source may be remotely cycled between duty and standby modes via an optical control fiber. 3 figs.

  7. Electrical transmission line diametrical retainer

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David; Dahlgren, Scott; Sneddon, Cameron; Briscoe, Michael; Fox, Joe

    2004-12-14

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

  8. Generation and transmission expansion planning for renewable energy integration

    SciTech Connect (OSTI)

    Bent, Russell W; Berscheid, Alan; Toole, G. Loren

    2010-11-30

    In recent years the expansion planning problem has become increasingly complex. As expansion planning (sometimes called composite or integrated resource planning) is a non-linear and non-convex optimization problem, researchers have traditionally focused on approximate models of power flows to solve the problem. The problem has also been split into generation expansion planning (GEP) and transmission network expansion planning (TNEP) to improve computational tractability. Until recently these approximations have produced results that are straight-forward to combine and adapt to the more complex and complete problem. However, the power grid is evolving towards a state where the adaptations are no longer easy (e.g. large amounts of limited control, renewable generation, comparable generation and transmission construction costs) and necessitates new approaches. Recent work on deterministic Discrepancy Bounded Local Search (DBLS) has shown it to be quite effective in addressing the TNEP. In this paper, we propose a generalization of DBLS to handle simultaneous generation and transmission planning.

  9. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 27, 2012 Turner Named Southwestern Administrator Chris Turner Chris Turner Christopher Turner has been named as the new Administrator of the Southwestern Power Administration (Southwestern) in Tulsa, OK, effective July 29, 2012. Mr. Turner brings to Southwestern 30 years' experience in the electric utility industry, including various leadership positions involving transmission and distribution construction, energy trading, bulk power operations, resource planning, and compliance with

  10. Cost estimation of HVDC transmission system of Bangkas NPP candidates

    SciTech Connect (OSTI)

    Liun, Edwaren Suparman

    2014-09-30

    Regarding nuclear power plant development in Bangka Island, it can be estimated that produced power will be oversupply for the Bangka Island and needs to transmit to Sumatra or Java Island. The distance between the regions or islands causing considerable loss of power in transmission by alternating current, and a wide range of technical and economical issues. The objective of this paper addresses to economics analysis of direct current transmission system to overcome those technical problem. Direct current transmission has a stable characteristic, so that the power delivery from Bangka to Sumatra or Java in a large scale efficiently and reliably can be done. HVDC system costs depend on the power capacity applied to the system and length of the transmission line in addition to other variables that may be different.

  11. Chemical Routes to Colloidal Chalcogenide Nanosheets

    SciTech Connect (OSTI)

    Schaak, Raymond

    2015-02-19

    This project sought to develop new low-temperature synthetic pathways to intermetallic and chalcogenide nanostructures and powders, with an emphasis on systems that are relevant to advancing the synthesis, processing, and discovery of superconducting materials. The primary synthetic routes involved solution chemistry methods, and several fundamental synthetic challenges that underpinned the formation of these materials were identified and investigated. Methods for incorporating early transition metals and post transition metals into nanoscale and bulk crystals using low-temperature solution chemistry methods were developed and studied, leading to colloidal nanocrystals of elemental indium, manganese, and germanium, as well as nanocrystalline and bulk intermetallic compounds containing germanium, gallium, tin, indium, zinc, bismuth, and lithium. New chemical tools were developed to help target desired phases in complex binary intermetallic and metal chalcogenide systems that contain multiple stable phases, including direct synthesis methods and chemical routes that permit post-synthetic modification. Several phases that are metastable in bulk systems were targeted, synthesized, and characterized as nanocrystalline solids and bulk powders, including the L12-type intermetallic compounds Au3Fe, Au3Ni, and Au3Co, as well as wurtzite-type MnSe. Methods for accessing crystalline metal borides and carbides using direct solution chemistry methods were also developed, with an emphasis on Ni3B and Ni3C, which revealed useful correlations of composition and magnetic properties. Methods for scale-up and nanoparticle purification were explored, providing access to centimeter-scale pressed pellets of polyol-synthesized nanopowders and a bacteriophage-mediated method for separating impure nanoparticle mixtures into their components. Several advances were made in the synthesis of iron selenide and related superconducting materials, including the production of colloidal FeSe nanosheets and a post-synthetic method for selectively leaching excess selenium from chalcogen-rich Fe-Se samples to precisely target the desired superconducting FeSe polymorph. The insights into FeSe nanosheet formation were applied to other metal chalcogenide systems, including SnSe, SnS, GeSe, and GeS, which led to advances in the synthesis and characterization of 0D, 1D, 2D, and 3D metal chalcogenide nanostructures, including morphology-dependent crystal structures in the SnS system.

  12. Microsoft Word - 2007_10_IPv6_Report_FINAL_RevAppv3LPhillips...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... and any additional header length may increase packet delays. ... routing, through faster route lookup and reduced latency. ... such as power plants, transmission substations, and ...

  13. EIS-0090: Fort Peck-Havre Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of its proposed action to construct and operate a 230kV transmission line from Fort Peck to Havre, Montana, with three intermediate interconnecting substations.

  14. EIS-0114: Fall River/Lower Valley Transmission System Reinforcement

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this EIS to explore reinforcing the electrical transmission system in southeastern Idaho by adding a 161-kilovolt partly single- and double-circuit line from the Goshen to Drummond Substations in order to maintain reliable electric service in the area.

  15. EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada.

  16. Reactive Power Compensating System.

    DOE Patents [OSTI]

    Williams, Timothy J.; El-Sharkawi, Mohamed A.; Venkata, Subrahmanyam S.

    1985-01-04

    The circuit was designed for the specific application of wind-driven induction generators. It has great potential for application in any situation where a varying reactive power load is present, such as with induction motors or generators, or for transmission network compensation.

  17. Hybrid vehicle powertrain system with power take-off driven vehicle accessory

    DOE Patents [OSTI]

    Beaty, Kevin D.; Bockelmann, Thomas R.; Zou, Zhanijang; Hope, Mark E.; Kang, Xiaosong; Carpenter, Jeffrey L.

    2006-09-12

    A hybrid vehicle powertrain system includes a first prime mover, a first prime mover driven power transmission mechanism having a power take-off adapted to drive a vehicle accessory, and a second prime mover. The second prime mover is operable to drive the power transmission mechanism alone or in combination with the first prime mover to provide power to the power take-off through the power transmission mechanism. The invention further includes methods for operating a hybrid vehicle powertrain system.

  18. Transmission Services Product Pricing Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and 09:00 PPT on the above effective date. On October 15, 2013, at 08:00 (PPT), Transmission Services will be updating the OASIS default product prices to reflect the 2014...

  19. Transmission Services Product Pricing Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and 12:00 PPT on the above effective date. On October 1, 2015, at 11:00 (PPT), Transmission Services will be updating the OASIS default product prices to reflect the 2016...

  20. Transmission Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity ...

  1. Electricity Generation, Transmission and Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generation, Transmission and Energy Storage Systems Utilities and other electricity and transmission providers and regulators often require that equipment be proven safe and reliable before it is permitted on the grid. However, energy storage manufacturers and integrators are often unable to afford or provide the logistics necessary for this long-term testing and monitoring. The Energy Storage Test Pad (ESTP) in conjunction with the Energy Storage Analysis Laboratory (ESAL) provides trusted,

  2. NREL: Transmission Grid Integration - Webinars

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Past Webinars The Rise of Renewables: Integration Challenges and Opportunities Thursday, May 29, 2014 As states reach higher levels of renewable energy, challenges can arise because of larger amounts of wind and solar energy on

  3. Transmission Reliability | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will

  4. Technical Progress Report, Phase II Inventory of Wind Green Pricing report Fact Sheets Liability Insurance for Small Wind Energy Systems Zoning Issues for Small Wind Systems Small Wind System Slideshow Small Wind State by State Information Wind Power and Electric transmission Policy: Constructs, Constraints and Critical Path

    SciTech Connect (OSTI)

    Swisher, Randall Holt, Edward Wooley, David

    2002-05-08

    Status report on Green power Factsheets and product database. Small wind turbines as a distributed power

  5. EIS-0496: San Luis Transmission Project; Alameda, Merced, San Joaquin and Stanislaus Counties, California

    Broader source: Energy.gov [DOE]

    Western Area Power Administration and the San Luis & Delta-Mendota Water Authority (Authority) as joint federal and state lead agencies, are preparing an EIS/Environmental Impact Report that assesses the potential environmental impacts of the proposed San Luis Transmission Project. Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line between its Tracy and San Luis Substations and a new 70-kV transmission line between the San Luis and O'Neill Substations.

  6. EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

  7. EA-1972: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild;

    Energy Savers [EERE]

    Pinal County, Arizona | Department of Energy 2: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild; Pinal County, Arizona EA-1972: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild; Pinal County, Arizona SUMMARY Western Area Power Administration prepared an EA that assesses the potential environmental impacts of the proposed rebuild of a 35.6-mile transmission line that Western operates and maintains under an agreement with the Central Arizona Project. Additional

  8. Electric Transmission Siting | Open Energy Information

    Open Energy Info (EERE)

    OtherOther: Electric Transmission SitingLegal Abstract Brief overview of the California Public Utilities Commission's process for siting of electric transmission lines. Published...

  9. Hydrogen Transmission and Distribution Workshop | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Transmission and Distribution Workshop The U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) held a Hydrogen Transmission and Distribution ...

  10. Energy Efficiency, Renewable Energy and Advanced Transmission...

    Energy Savers [EERE]

    Renewable Energy and Advanced Transmission and Distribution Technologies Issued: July 29, 2009 Energy Efficiency, Renewable Energy and Advanced Transmission and Distribution ...

  11. Midwest Independent Transmission System Operator | Open Energy...

    Open Energy Info (EERE)

    Midwest Independent Transmission System Operator Jump to: navigation, search Name: Midwest Independent Transmission System Operator Place: Carmel, IN References: SGIC1 This...

  12. American Transmission Systems Inc | Open Energy Information

    Open Energy Info (EERE)

    American Transmission Systems Inc Jump to: navigation, search Name: American Transmission Systems Inc Place: Ohio Website: www.atcllc.com Twitter: @amertransco References: EIA...

  13. Interconnection-Wide Transmission Planning Initiative: Topic...

    Energy Savers [EERE]

    the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas ...

  14. DOE Transmission Capacity Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission systems both complement and substitute for generation. Transmission generally ... load growth, generator construction, and other factors affecting the electric system. ...

  15. Lone Star Transmission LLC | Open Energy Information

    Open Energy Info (EERE)

    Transmission LLC Jump to: navigation, search Name: Lone Star Transmission LLC Place: Juno Beach, Florida Zip: 33408 Product: Wholly owned subsidiary of FPL Energy, developing...

  16. Transmission Capital Limited | Open Energy Information

    Open Energy Info (EERE)

    Transmission Capital Limited Jump to: navigation, search Name: Transmission Capital Limited Place: London, United Kingdom Zip: EC2V 7HR Sector: Renewable Energy, Services Product:...

  17. Southwest Transmission Cooperative, Inc. Smart Grid Project ...

    Open Energy Info (EERE)

    syntax: * Display map References ARRA Smart Grid Investment Grants1 Southwest Transmission Cooperative Award2 Southwest Transmission Cooperative, Inc., located in Benson,...

  18. 2006 National Electric Transmission Congestion Study | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor). ...

  19. 2009 National Electric Transmission Congestion Study | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor). ...

  20. 2006 National Electric Transmission Congestion Study Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

  1. Interconnection-Wide Transmission Planning Initiative - Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to ...

  2. Impact of Distribution-Connected Large-Scale Wind Turbines on Transmission System Stability during Large Disturbances: Preprint

    SciTech Connect (OSTI)

    Zhang, Y.; Allen, A.; Hodge, B. M.

    2014-02-01

    This work examines the dynamic impacts of distributed utility-scale wind power during contingency events on both the distribution system and the transmission system. It is the first step toward investigating high penetrations of distribution-connected wind power's impact on both distribution and transmission stability.

  3. EIS-0378: Port Angeles-Juan de Fuca Transmission Project, WA

    Broader source: Energy.gov [DOE]

    This EIS assesses DOE decision to approve the Sea Breeze Transmission project for a Presidential permit for through DOE's Office of Electricity Delivery and Energy Reliability and for approval for interconnection into the federal transmission system through the Bonneville Power Administration (BPA).

  4. EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

  5. Montana/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Montana Electric Power Cooperative, Western Area Power Administration, Bonneville Power Administration, Western Area Power Administration, Columbia Grid, Northern Tier...

  6. Computer controllable synchronous shifting of an automatic transmission

    DOE Patents [OSTI]

    Davis, R.I.; Patil, P.B.

    1989-08-08

    A multiple forward speed automatic transmission produces its lowest forward speed ratio when a hydraulic clutch and hydraulic brake are disengaged and a one-way clutch connects a ring gear to the transmission casing. Second forward speed ratio results when the hydraulic clutch is engaged to connect the ring gear to the planetary carrier of a second gear set. Reverse drive and regenerative operation result when an hydraulic brake fixes the planetary and the direction of power flow is reversed. Various sensors produce signals representing the torque at the output of the transmission or drive wheels, the speed of the power source, and the hydraulic pressure applied to a clutch and brake. A control algorithm produces input data representing a commanded upshift, a commanded downshift, a commanded transmission output torque, and commanded power source speed. A microprocessor processes the inputs and produces a response to them in accordance with the execution of a control algorithm. Output or response signals cause selective engagement and disengagement of the clutch and brake at a rate that satisfies the requirements for a short gear ratio change and smooth torque transfer between the friction elements. 6 figs.

  7. Computer controlled synchronous shifting of an automatic transmission

    DOE Patents [OSTI]

    Davis, Roy I.; Patil, Prabhakar B.

    1989-01-01

    A multiple forward speed automatic transmission produces its lowest forward speed ratio when a hydraulic clutch and hydraulic brake are disengaged and a one-way clutch connects a ring gear to the transmission casing. Second forward speed ratio results when the hydraulic clutch is engaged to connect the ring gear to the planetary carrier of a second gear set. Reverse drive and regenerative operation result when an hydraulic brake fixes the planetary and the direction of power flow is reversed. Various sensors produce signals representing the torque at the output of the transmission or drive wheels, the speed of the power source, and the hydraulic pressure applied to a clutch and brake. A control algorithm produces input data representing a commanded upshift, a commanded downshift, a commanded transmission output torque, and commanded power source speed. A microprocessor processes the inputs and produces a response to them in accordance with the execution of a control algorithm. Output or response signals cause selective engagement and disengagement of the clutch and brake at a rate that satisfies the requirements for a short gear ratio change and smooth torque transfer between the friction elements.

  8. EIS-0008: Dickey-Lincoln School Lakes Transmission Project, Maine, New Hampshire, and Vermont

    Broader source: Energy.gov [DOE]

    The U.S. Army Corps of Engineers and the U.S. Department of Energy's Bonneville Power Administration developed this statement to evaluate the environmental impacts of the Dickey-Lincoln School Lakes Transmission Project.

  9. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

  10. A simple route to the synthesis of single crystalline copper metagermanate nanowires

    SciTech Connect (OSTI)

    Pei, L.Z.; Zhao, H.S.; Tan, W.; Yu, H.Y.; Chen, Y.W.; Zhang Qianfeng; Fan, C.G.

    2009-12-15

    Single crystalline copper metagermanate (CuGeO{sub 3}) nanowires with the diameter of 30-300 nm and length of longer than 100 {mu}m have been prepared by a simple hydrothermal deposition route. X-ray diffraction (XRD), selected area electron diffraction (SAED), high-resolution transmission electron microscopy (HRTEM) and Raman analyses confirm that the nanowires are orthorhombic single crystals with a main growth direction along <101>. Room temperature photoluminescence (PL) measurement shows a strong blue emission peak at 442 nm with a broad emission band. The blue emission may be ascribed to radiative recombination of oxygen vacancies and oxygen-germanium vacancies. The formation process of CuGeO{sub 3} nanowires is also discussed.

  11. Building a Better Transmission Tower | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Better Transmission Tower Building a Better Transmission Tower May 20, 2011 - 9:41am Addthis A helicopter hoists platforms for linemen during the construction of this single-circuit 500-kilovolt tower – one of hundreds on the McNary-John Day line saving BPA big bucks. | Photo courtesy of Bonneville Power Administration A helicopter hoists platforms for linemen during the construction of this single-circuit 500-kilovolt tower - one of hundreds on the McNary-John Day line saving BPA big

  12. Western Area Power Administration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ,v*Zy- i , . r ,v * -i S # Af [, (e- . - o -A tl }r- 0 v-" l^~4~S J l ^-)^ I^U^ck iM clti ^ <p< ^^i~oeii ^' Western Area Power Administration Follow-up to Nov. 25, 2008 Transition Meeting Undeveloped Transmission Right-of-Way Western has very little undeveloped transmission right-of-way. There is a 7-mile right- of-way between Folsom, CA and Roseville, CA where Western acquired a 250' wide right-of-way but is only using half of it. Another line could be built parallel to Western's

  13. 2012 Wholesale Power and Transmission Rate Adjustment Proceeding

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    proposals for a balancing reserve capacity product that could be used to manage wind-related tail events but that would not necessarily be available at all hours of all days....

  14. Hydromechanical transmission with compound planetary assembly

    DOE Patents [OSTI]

    Orshansky, Jr., deceased, Elias; Weseloh, William E.

    1980-01-01

    A power transmission having three distinct ranges: (1) hydrostatic, (2) simple power-split hydromechanical, and (3) compound power-split hydromechanical. A single compound planetary assembly has two sun gears, two ring gears, and a single carrier with two sets of elongated planet gears. The two sun gears may be identical in size, and the two ring gears may be identical in size. A speed-varying module in driving relationship to the first sun gear is clutchable, in turn, to (1) the input shaft and (2) the second sun gear. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being the one clutchable to either the input shaft or to the second sun gear. The other unit, which may have a fixed stroke, is connected in driving relation to the first sun gear. A brake grounds the carrier in the first range and in reverse and causes drive to be delivered to the output shaft through the first ring gear in a hydrostatic mode, the first ring gear being rigidly connected to the output shaft. The input shaft is also clutchable to the second ring gear of the compound planetary assembly.

  15. Cost-Effective Fabrication Routes for the Productionof Quantum...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Productionof Quantum-Well-Type Structures and Recovoery of Waste Heat from Heavy-Duty Trucks Cost-Effective Fabrication Routes for the Productionof Quantum-Well-Type Structures and ...

  16. System for Import/Export Routing and Recovery Analysis | NISAC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for ImportExport Routing and Recovery Analysis content top Network Optimization Models (RNAS and ATOM) Posted by Admin on Mar 1, 2012 in | Comments 0 comments Many critical...

  17. A New Route to Nano Self-Assembly

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A New Route to Nano Self-Assembly Print If the promise of nanotechnology is to be fulfilled, nanoparticles will have to be able to make something of themselves. An important...

  18. Jobs and Economic Development from New Transmission and Generation in Wyoming Fact Sheet

    SciTech Connect (OSTI)

    2011-05-10

    Wyoming is a significant energy exporter, producing nearly 40% of the nation's coal and 10% of the nation's natural gas. However, opportunities to add new energy exports in the form of power generation are limited by insufficient transmission capacity. This fact sheet summarizes results from a recent analysis conducted by NREL for the Wyoming Infrastructure Authority that estimates jobs and economic development activity that could occur in Wyoming should the market support new investments in power generation and transmission in the state.

  19. Optimizing your options: Extracting the full economic value of transmission when planning under uncertainty

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Munoz, Francisco D.; Watson, Jean -Paul; Hobbs, Benjamin F.

    2015-06-04

    In this study, the anticipated magnitude of needed investments in new transmission infrastructure in the U.S. requires that these be allocated in a way that maximizes the likelihood of achieving society's goals for power system operation. The use of state-of-the-art optimization tools can identify cost-effective investment alternatives, extract more benefits out of transmission expansion portfolios, and account for the huge economic, technology, and policy uncertainties that the power sector faces over the next several decades.

  20. PP-61 Minnkota Power Cooperative (MPC) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    electric transmission facilities at the U.S. - Canada Border. PDF icon PP-61 Minnkota Power Cooperative (MPC) More Documents & Publications PP-61-

  1. INL and NREL Demonstrate Power Grid Simulation at a Distance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    such as the loss of a power generator or a sudden ... Then, the INL transmission line also will respond appropriately to ... Office of Energy Efficiency and Renewable Energy ...

  2. Uttar Pradesh Power Corporation Ltd UPPCL | Open Energy Information

    Open Energy Info (EERE)

    Pradesh, India Product: Indian utility which is responsible for planning and managing the power sector of Uttar Pradesh State through its transmission, distribution and supply of...

  3. RAPID/Geothermal/Power Plant | Open Energy Information

    Open Energy Info (EERE)

    transmission, delivery, or furnishing of light, power, heat, cold, water, gar, or oil. However, the definition of public utility does not include any user, owner, or...

  4. Carbon Power & Light- Residential and Commercial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Carbon Power and Light, in collaboration with Tri-State Generation and Transmission Association, offers financial incentives for members to increase the energy efficiency of homes and facilities....

  5. Energy Department Report Calculates Emissions and Costs of Power...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    does not consider other factors such as capital costs of construction for wind, solar, fossil-fueled power plants, or transmission. These costs are significant, but outside the...

  6. Power Function Review Final Report, June 24, 2005

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Payments to IOUs 323M* Transmission Purchases, ReserveAncillary Services 184M Fish and Wildlife Direct Program 143M Other 105M Internal Operations Charged to Power...

  7. NEVADA NATIONAL SECURITY SITE (NNSS) DRIVERS ROUTE/SHIPMENT INFORMATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (NNSS) DRIVERS ROUTE/SHIPMENT INFORMATION (12/2014 Log No. 2014-229) NOTE: THIS FORM IS TWO (2) PAGES - YOU MUST COMPLETE BOTH PAGES NNSS SHIPMENT NUMBER: CARRIER NAME: TRACTOR NO.: TRAILER NO.: AT ORIGIN AT NNSS Main Gate NNSS OFFICE USE ONLY DEPARTURE DATE: ARRIVAL DATE: DESTINATION AREA: Area 5 DEPARTURE TIME: ARRIVAL TIME: NNSS DEPARTURE TIME: LOCATION: HELD OVER? No Yes REASON: ROUTE INFORMATION REVIEWED BY: ONSITE SHIPMENT (MAP NOT APPLICABLE) DROP YARD; LEAVE THIS FORM WITH SHIPPING

  8. Photochemical route to actinide-transition metal bonds: synthesis,

    Office of Scientific and Technical Information (OSTI)

    characterization and reactivity of a series of thorium and uranium heterobimetallic complexes (Journal Article) | SciTech Connect Journal Article: Photochemical route to actinide-transition metal bonds: synthesis, characterization and reactivity of a series of thorium and uranium heterobimetallic complexes Citation Details In-Document Search Title: Photochemical route to actinide-transition metal bonds: synthesis, characterization and reactivity of a series of thorium and uranium

  9. Systems for the Intermodal Routing of Spent Nuclear Fuel

    SciTech Connect (OSTI)

    Peterson, Steven K; Liu, Cheng

    2015-01-01

    The safe and secure movement of spent nuclear fuel from shutdown and active reactor facilities to intermediate or long term storage sites may, in some instances, require the use of several modes of transportation to accomplish the move. To that end, a fully operable multi-modal routing system is being developed within Oak Ridge National Laboratory s (ORNL) WebTRAGIS (Transportation Routing Analysis Geographic Information System). This study aims to provide an overview of multi-modal routing, the existing state of the TRAGIS networks, the source data needs, and the requirements for developing structural relationships between various modes to create a suitable system for modeling the transport of spent nuclear fuel via a multimodal network. Modern transportation systems are comprised of interconnected, yet separate, modal networks. Efficient transportation networks rely upon the smooth transfer of cargoes at junction points that serve as connectors between modes. A key logistical impediment to the shipment of spent nuclear fuel is the absence of identified or designated transfer locations between transport modes. Understanding the potential network impacts on intermodal transportation of spent nuclear fuel is vital for planning transportation routes from origin to destination. By identifying key locations where modes intersect, routing decisions can be made to prioritize cost savings, optimize transport times and minimize potential risks to the population and environment. In order to facilitate such a process, ORNL began the development of a base intermodal network and associated routing code. The network was developed using previous intermodal networks and information from publicly available data sources to construct a database of potential intermodal transfer locations with likely capability to handle spent nuclear fuel casks. The coding development focused on modifying the existing WebTRAGIS routing code to accommodate intermodal transfers and the selection of prioritization constraints and modifiers to determine route selection. The limitations of the current model and future directions for development are discussed, including the current state of information on possible intermodal transfer locations for spent fuel.

  10. Interconnection Transmission Planning: Awards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and Reinvestment Act organized by interconnection including the organization and amount of Recovery Act funding PDF icon Interconnection Transmission Planning: Awards More Documents & Publications EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 Report: Impacts of Demand-Side

  11. Energy Department, Arizona Utilities Announce Transmission Infrastructure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Energization | Department of Energy Arizona Utilities Announce Transmission Infrastructure Project Energization Energy Department, Arizona Utilities Announce Transmission Infrastructure Project Energization February 12, 2015 - 2:30pm Addthis News Media Contact 202 586 4940 DOENews@hq.doe.gov Energy Department, Arizona Utilities Announce Transmission Infrastructure Project Energization Transmission Line Increases Reliability, Access to Affordable Energy in Southwest States WASHINGTON

  12. Synthesis of graphene platelets by chemical and electrochemical route

    SciTech Connect (OSTI)

    Ramachandran, Rajendran; Felix, Sathiyanathan [Centre for Nanotechnology Research, VIT University, Vellore 632014, Tamil Nadu (India); Joshi, Girish M. [Materials Physics Division, School of Advanced Sciences, VIT University, Vellore 632014, Tamil Nadu (India); Raghupathy, Bala P.C., E-mail: balapraveen2000@yahoo.com [Centre for Nanotechnology Research, VIT University, Vellore 632014, Tamil Nadu (India); Research and Advanced Engineering Division (Materials), Renault Nissan Technology and Business Center India (P) Ltd., Chennai, Tamil Nadu (India); Jeong, Soon Kwan, E-mail: jeongsk@kier.re.kr [Climate Change Technology Research Division, Korea Institute of Energy Research, Yuseong-gu, Daejeon 305-343 (Korea, Republic of); Grace, Andrews Nirmala, E-mail: anirmalagrace@vit.ac.in [Centre for Nanotechnology Research, VIT University, Vellore 632014, Tamil Nadu (India); Climate Change Technology Research Division, Korea Institute of Energy Research, Yuseong-gu, Daejeon 305-343 (Korea, Republic of)

    2013-10-15

    Graphical abstract: A schematic showing the overall reduction process of graphite to reduced graphene platelets by chemical and electrochemical route. - Highlights: Graphene was prepared by diverse routes viz. chemical and electrochemical methods. NaBH{sub 4} was effective for removing oxygen functional groups from graphene oxide. Sodium borohydride reduced graphene oxide (SRGO) showed high specific capacitance. Electrochemical rendered a cheap route for production of graphene in powder form. - Abstract: Graphene platelets were synthesized from graphene oxide by chemical and electrochemical route. Under the chemical method, sodium borohydride and hydrazine chloride were used as reductants to produce graphene. In this paper, a novel and cost effective electrochemical method, which can simplify the process of reduction on a larger scale, is demonstrated. The electrochemical method proposed in this paper produces graphene in powder form with good yield. The atomic force microscopic images confirmed that the graphene samples prepared by all the routes have multilayers of graphene. The electrochemical process provided a new route to make relatively larger area graphene sheets, which will have interest for further patterning applications. Attempt was made to quantify the quantum of reduction using cyclic voltammetry and choronopotentiometry techniques on reduced graphene samples. As a measure in reading the specific capacitance values, a maximum specific capacitance value of 265.3 F/g was obtained in sodium borohydride reduced graphene oxide.

  13. The fuel efficient missile combat crew routing network. Master's thesis

    SciTech Connect (OSTI)

    Jacques, E.O. Jr.; Woolley, M.G.

    1980-06-01

    Missile combat crew vehicles are the highest mileage accumulators within SAC and, in the interest of energy conservation, Vice CINCSAC has initiated a long-term study examining utilization of more fuel efficient crew vehicles. This thesis extends the SAC study by determining if alternate dispatch procedures and routes of travel, using currently assigned vehicles, would result in fuel conservation. A network routing model is used to determine the routes of travel for three deployment strategies and five vehicle types at the Minot AFB, ND test base. Fuel efficiency for these fifteen alternatives, measured as gallons of fuel consumed per passenger, is compared with the existing missile combat crew routing network. This study found that ten of the fifteen vehicle/deployment strategy combinations, when employed over the shortest authorized routes of travel that were developed, provided improvement over the fuel efficiency of the MCC routing system that was in effect as of 31 August 1979. The largest potential savings amounted to 52% or 26,255 gallons of fuel per year.

  14. Utility-Scale Power Router: Dynamic Control of Grid Assets Using Direct AC Converter Cells

    SciTech Connect (OSTI)

    2010-09-01

    ADEPT Project: Georgia Tech is developing a cost-effective, utility-scale power router that uses an enhanced transformer to more efficiently direct power on the grid. Existing power routing technologies are too expensive for widespread use, but the ability to route grid power to match real-time demand and power outages would significantly reduce energy costs for utilities, municipalities, and consumers. Georgia Tech is adding a power converter to an existing grid transformer to better control power flows at about 1/10th the cost of existing power routing solutions. Transformers convert the high-voltage electricity that is transmitted through the grid into the low-voltage electricity that is used by homes and businesses. The added converter uses fewer steps to convert some types of power and eliminates unnecessary power storage, among other improvements. The enhanced transformer is more efficient, and it would still work even if the converter fails, ensuring grid reliability.

  15. Design Considerations of Fast-cycling Synchrotrons Based on Superconducting Transmission Line Magnets

    SciTech Connect (OSTI)

    Piekarz, H.; Hays, S.; Huang, Y.; Shiltsev, V.; /Fermilab

    2008-06-01

    Fast-cycling synchrotrons are key instruments for accelerator based nuclear and high-energy physics programs. We explore a possibility to construct fast-cycling synchrotrons by using super-ferric, {approx}2 Tesla B-field dipole magnets powered with a superconducting transmission line. We outline both the low temperature (LTS) and the high temperature (HTS) superconductor design options and consider dynamic power losses for an accelerator with operation cycle of 0.5 Hz. We also briefly outline possible power supply system for such accelerator, and discuss the quench protection system for the magnet string powered by a transmission line conductor.

  16. March 30 Tribal Webinar to Focus on Transmission and Grid Basics |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy March 30 Tribal Webinar to Focus on Transmission and Grid Basics March 30 Tribal Webinar to Focus on Transmission and Grid Basics March 15, 2016 - 10:35am Addthis According to the U.S. Department of Energy (DOE), the U.S. electric energy industry comprises more than 7,000 power plants representing 1,151,812 megawatts of generation connected to more than 360,000 miles of high-voltage transmission lines. Understanding the basics of this industry, specifically transmission,

  17. Pulse transmission receiver with higher-order time derivative pulse correlator

    DOE Patents [OSTI]

    Dress, Jr., William B.; Smith, Stephen F.

    2003-09-16

    Systems and methods for pulse-transmission low-power communication modes are disclosed. A pulse transmission receiver includes: a higher-order time derivative pulse correlator; a demodulation decoder coupled to the higher-order time derivative pulse correlator; a clock coupled to the demodulation decoder; and a pseudorandom polynomial generator coupled to both the higher-order time derivative pulse correlator and the clock. The systems and methods significantly reduce lower-frequency emissions from pulse transmission spread-spectrum communication modes, which reduces potentially harmful interference to existing radio frequency services and users and also simultaneously permit transmission of multiple data bits by utilizing specific pulse shapes.

  18. Factors affecting route selection and survival of steelhead kelts at Snake River dams in 2012 and 2013

    SciTech Connect (OSTI)

    Harnish, Ryan A.; Colotelo, Alison H. A.; Li, Xinya; Fu, Tao; Ham, Kenneth D.; Deng, Zhiqun; Green, Ethan D.

    2015-03-31

    In 2012 and 2013, Pacific Northwest National Laboratory (PNNL) conducted a study that summarized the passage route proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged kelts. Kelts were also tagged with passive integrated transponder tags to monitor passage through juvenile bypass systems (JBS) and detect returning fish. The current study evaluated data collected in 2012 and 2013 to identify environmental, temporal, operational, individual, and behavioral variables that were related to forebay residence time, route of passage, and survival of steelhead kelts at FCRPS dams on the Snake River. Multiple approaches, including 3-D tracking, bivariate and multivariable regression modeling, and decision tree analyses were used to identify the environmental, temporal, operational, individual, and behavioral variables that had the greatest effect on forebay residence time, route of passage, and route-specific and overall dam passage survival probabilities for tagged kelts at Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams. In general, kelt behavior and discharge appeared to work independently to affect forebay residence times. Kelt behavior, primarily approach location, migration depth, and “searching” activities in the forebay, was found to have the greatest influence on their route of passage. The condition of kelts was the single most important factor affecting their survival. The information gathered in this study may be used by dam operators and fisheries managers to identify potential management actions to improve in-river survival of kelts or collection methods for kelt reconditioning programs to aid the recovery of Snake River steelhead populations.

  19. Incremental cost pricing of transmission services. Final report

    SciTech Connect (OSTI)

    Not Available

    1994-12-01

    This report, prepared by ICF Resources, under a sub-contract with IT Corporation, is concerned chiefly with examining the economic concepts underlying an Incremental Cost Pricing Framework (ICPF), which is defined here as a pricing regime that takes into account several factors: economic efficiency in terms of sending the correct long-term price signals to both users and owners of transmission assets; pricing of individual services in relationship to cost causation; full recovery of costs associated with transmission service; and applicability to real-world power systems without extraordinary administrative burdens. In the course of this examination, the report makes assumptions, as necessary, and assesses the extent to which they may or may not comport with real-world conditions. It also assesses the pros and cons of different approaches to pricing various components of transmission service without making a recommendation as to the superiority of one approach over another from a public policy perspective.

  20. Wireless Power Transfer

    SciTech Connect (OSTI)

    2013-07-22

    Wireless Power Transfer is an innovative approach using magnetic resonance coupling of air core transformers designed for today's growing plug-in electric vehicle market. This technology can provide a convenient, safe and flexible means to charge electric vehicles under stationary and dynamic conditions. Plug-in Electric Vehicles (PEV) are burdened by the need for cable and plug charger, galvanic isolation of the on-board electronics, bulk and cost of this charger and the large energy storage system (ESS) packs needed. With a system where you have to physically plug in there are a number of occasions where the owner could very well forget to charge the vehicle. For stationary applications (like charging of a PHEV at home), ORNL's innovative wireless power transfer technology adds a convenience factor compared to actually plugging in which will mean that the vehicle will have a full charge every morning. Electric vehicle charging must be safe, compact and efficient in order to be convenient for customers. By reconfiguring the transformer and altering the resonance frequency, energy is transferred to the battery with lower energy losses and with fewer demands on the primary circuit by the rest of the transformer system. The ORNL discovery shows that sufficient power for the battery can be transferred from the primary to secondary circuits without significant energy losses if the operating frequency is set at 50% to 95% of the resonance frequency of the circuit. The electrical power is then transmitted to the chargeable battery, which is electrically coupled to the secondary circuit through the air core transformer. Some advantages include: Reduced energy losses during transfer of energy to the battery; A charge potential that is relatively unaffected by up to 25% misalignment of vehicle; and Other receiving components draw less power from the primary circuit. These advantages allow wireless power technology applications to expand at the workplace and beyond as the demand for EV rises. For vehicles that operate over a fixed route such as busses and shuttle vehicles, Wireless Power Transfer (WPT) means that a smaller battery pack can be used. In the traditional system, the battery pack is designed to accommodate the needs of the entire route or shift. With WPT the battery can be downsized because it can be charged when the vehicle stops on its route (a rental car shuttle bus, for example, can charge when it waits in the terminal and again when it waits at the rental car place. Thus the battery only needs enough charge to get to the next stop. This decrease in battery size means significant cost savings to electrify the vehicle. This technology enables efficient "opportunity charging stations" for predefined routes and planned stops reducing down time. Charging can occur in minutes. This improvement also eliminates the harmful emissions that occur in garages while buses are at idle during charging. In larger cities, dynamic charging offers an even greater impact utilizing existing infrastructure. As vehicles travel along busy freeways and interstate systems, wireless charging can occur while the vehicle is in motion. With this technology a vehicle essentially has unlimited electric range while using a relatively small battery pack. In-motion charging stations use vehicle sensors to alert the driver. Traveling at normal speeds, sensors establish in-motion charging. WPT transmit pads sequentially energize to the negotiated power level based on vehicle speed and its requested charging energy. Lower power when vehicle speed is slow and much higher power for faster moving vehicles. Vehicle to Infrastructure communications (V2I) coordinates WPT charging level according to on-board battery pack state-of-charge. V2I activates the roadway transmit pads placing them in standby mode and negotiates charging fee based on prevailing grid rate and vehicle energy demand. Dynamic charging would allow electricity to supply a very large fraction of the energy for the transportation sector and reduce greatly petroleum consump

  1. Microsoft Word - Broadband Over Power Lines_FINAL.06.01.10.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Broadband over Powerlines Can Accelerate the Transmission Smart Grid May 25, 2010 DOE/NETL-2010/1418 Broadband Over Power Lines Could Accelerate the Transmission Smart Grid Broadband Over Power Lines Could Accelerate the Transmission Smart Grid 1 Prepared by: Booz Allen Hamilton (BAH) Bruce Renz Renz Consulting, LLC DOE Contract number: DE-FE000400 Broadband Over Power Lines Could Accelerate the Transmission Smart Grid 2 Acknowledgements This report was prepared by Booz Allen Hamilton, Inc.

  2. Wireless energy transmission to supplement energy harvesters in sensor network applications

    SciTech Connect (OSTI)

    Farinholt, Kevin M; Taylor, Stuart G; Park, Gyuhae; Farrar, Charles R

    2010-01-01

    In this paper we present a method for coupling wireless energy transmission with traditional energy harvesting techniques in order to power sensor nodes for structural health monitoring applications. The goal of this study is to develop a system that can be permanently embedded within civil structures without the need for on-board power sources. Wireless energy transmission is included to supplement energy harvesting techniques that rely on ambient or environmental, energy sources. This approach combines several transducer types that harvest ambient energy with wireless transmission sources, providing a robust solution that does not rely on a single energy source. Experimental results from laboratory and field experiments are presented to address duty cycle limitations of conventional energy harvesting techniques, and the advantages gained by incorporating a wireless energy transmission subsystem. Methods of increasing the efficiency, energy storage medium, target applications and the integrated use of energy harvesting sources with wireless energy transmission will be discussed.

  3. Capricious Cables: Understanding the Key Concepts in Transmission Expansion Planning and Its Models

    SciTech Connect (OSTI)

    Donohoo, P.; Milligan, M.

    2014-06-01

    The extra-high-voltage transmission network is the bulk transport network of the electric power system. To understand how the future power system may react to planning decisions today, wide-area transmission models are increasingly used to aid decision makers and stakeholders. The goal of this work is to illuminate these models for a broader audience that may include policy makers or relative newcomers to the field of transmission planning. This paper explains the basic transmission expansion planning model formulation. It highlights six of the major simplifications made in transmission expansion planning models and the resulting need to contextualize model results using knowledge from other models and knowledge not captured in the modeling process.

  4. Integrating Wind into Transmission Planning: The Rocky Mountain Area Transmission Study (RMATS): Preprint

    SciTech Connect (OSTI)

    Hamilton, R.; Lehr, R.; Olsen, D.; Nielsen, J.; Acker, T.; Milligan, M.; Geller, H.

    2004-03-01

    Plans to expand the western grid are now underway. Bringing power from low-cost remote resources--including wind--to load centers could reduce costs for all consumers. But many paths appear to be already congested. Locational marginal price-based modeling is designed to identify the most cost-effective paths to be upgraded. The ranking of such paths is intended as the start of a process of political and regulatory approvals that are expected to result in the eventual construction of new and upgraded lines. This paper reviews the necessary data and analytical tasks to accurately represent wind in such modeling, and addresses some policy and regulatory issues that can help with wind integration into the grid. Providing wind fair access to the grid also (and more immediately) depends on tariff and regulatory changes. Expansion of the Rocky Mountain Area Transmission Study (RMATS) study scope to address operational issues supports the development of transmission solutions that enable wind to connect and deliver power in the next few years--much sooner than upgrades can be completed.

  5. Method and apparatus for routing data in an inter-nodal communications lattice of a massively parallel computer system by routing through transporter nodes

    DOE Patents [OSTI]

    Archer, Charles Jens; Musselman, Roy Glenn; Peters, Amanda; Pinnow, Kurt Walter; Swartz, Brent Allen; Wallenfelt, Brian Paul

    2010-11-16

    A massively parallel computer system contains an inter-nodal communications network of node-to-node links. An automated routing strategy routes packets through one or more intermediate nodes of the network to reach a destination. Some packets are constrained to be routed through respective designated transporter nodes, the automated routing strategy determining a path from a respective source node to a respective transporter node, and from a respective transporter node to a respective destination node. Preferably, the source node chooses a routing policy from among multiple possible choices, and that policy is followed by all intermediate nodes. The use of transporter nodes allows greater flexibility in routing.

  6. Method and apparatus for routing data in an inter-nodal communications lattice of a massively parallel computer system by dynamically adjusting local routing strategies

    DOE Patents [OSTI]

    Archer, Charles Jens; Musselman, Roy Glenn; Peters, Amanda; Pinnow, Kurt Walter; Swartz, Brent Allen; Wallenfelt, Brian Paul

    2010-03-16

    A massively parallel computer system contains an inter-nodal communications network of node-to-node links. Each node implements a respective routing strategy for routing data through the network, the routing strategies not necessarily being the same in every node. The routing strategies implemented in the nodes are dynamically adjusted during application execution to shift network workload as required. Preferably, adjustment of routing policies in selective nodes is performed at synchronization points. The network may be dynamically monitored, and routing strategies adjusted according to detected network conditions.

  7. Transmission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volunteers - Sign Up About Science Bowl Curriculum and Activities How to Build a Motor The Great Marble Drop How to Build a Turbine How to Build a Tower Classroom...

  8. Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene and Comments

    Broader source: Energy.gov [DOE]

    Answer of International Transmission Company to late motions to intervene and comments of Baltimore Gas and Electric Company, American Electric Power, and Pepco Holdings, Inc.

  9. The Mesaba Energy Project: Clean Coal Power Initiative, Round 2

    SciTech Connect (OSTI)

    Stone, Richard; Gray, Gordon; Evans, Robert

    2014-07-31

    The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a total of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage Transmission Line Route, and Natural Gas Pipeline Route Permits for a Large Electric Power Generating Plant to be located in Taconite, Minnesota. In addition, major pre-construction permit applications have been filed requesting authorization for the Project to i) appropriate water sufficient to accommodate its worst case needs, ii) operate a major stationary source in compliance with regulations established to protect public health and welfare, and iii) physically alter the geographical setting to accommodate its construction. As of the current date, the Water Appropriation Permits have been obtained.

  10. A Tariff for Reactive Power

    SciTech Connect (OSTI)

    Kueck, John D; Kirby, Brendan J; Li, Fangxing; Tufon, Christopher; Isemonger, Alan

    2008-07-01

    Two kinds of power are required to operate an electric power system: real power, measured in watts, and reactive power, measured in volt-amperes reactive or VARs. Reactive power supply is one of a class of power system reliability services collectively known as ancillary services, and is essential for the reliable operation of the bulk power system. Reactive power flows when current leads or lags behind voltage. Typically, the current in a distribution system lags behind voltage because of inductive loads such as motors. Reactive power flow wastes energy and capacity and causes voltage droop. To correct lagging power flow, leading reactive power (current leading voltage) is supplied to bring the current into phase with voltage. When the current is in phase with voltage, there is a reduction in system losses, an increase in system capacity, and a rise in voltage. Reactive power can be supplied from either static or dynamic VAR sources. Static sources are typically transmission and distribution equipment, such as capacitors at substations, and their cost has historically been included in the revenue requirement of the transmission operator (TO), and recovered through cost-of-service rates. By contrast, dynamic sources are typically generators capable of producing variable levels of reactive power by automatically controlling the generator to regulate voltage. Transmission system devices such as synchronous condensers can also provide dynamic reactive power. A class of solid state devices (called flexible AC transmission system devices or FACTs) can provide dynamic reactive power. One specific device has the unfortunate name of static VAR compensator (SVC), where 'static' refers to the solid state nature of the device (it does not include rotating equipment) and not to the production of static reactive power. Dynamic sources at the distribution level, while more costly would be very useful in helping to regulate local voltage. Local voltage regulation would reduce system losses, increase circuit capacity, increase reliability, and improve efficiency. Reactive power is theoretically available from any inverter-based equipment such as photovoltaic (PV) systems, fuel cells, microturbines, and adjustable-speed drives. However, the installation is usually only economical if reactive power supply is considered during the design and construction phase. In this report, we find that if the inverters of PV systems or the generators of combined heat and power (CHP) systems were designed with capability to supply dynamic reactive power, they could do this quite economically. In fact, on an annualized basis, these inverters and generators may be able to supply dynamic reactive power for about $5 or $6 per kVAR. The savings from the local supply of dynamic reactive power would be in reduced losses, increased capacity, and decreased transmission congestion. The net savings are estimated to be about $7 per kVAR on an annualized basis for a hypothetical circuit. Thus the distribution company could economically purchase a dynamic reactive power service from customers for perhaps $6/kVAR. This practice would provide for better voltage regulation in the distribution system and would provide an alternate revenue source to help amortize the cost of PV and CHP installations. As distribution and transmission systems are operated under rising levels of stress, the value of local dynamic reactive supply is expected to grow. Also, large power inverters, in the range of 500 kW to 1 MW, are expected to decrease in cost as they become mass produced. This report provides one data point which shows that the local supply of dynamic reactive power is marginally profitable at present for a hypothetical circuit. We expect that the trends of growing power flow on the existing system and mass production of inverters for distributed energy devices will make the dynamic supply of reactive power from customers an integral component of economical and reliable system operation in the future.

  11. PP-45 Northern States Power Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Northern States Power Company PP-45 Northern States Power Company Presidential Permit authorizing Northern States Power Company to construct, operate, and maintain elextric transmission facilities at the U.S. - Canada Border. PDF icon PP-45 Northern States Power Company More Documents & Publications PP-45-2 Northern States Power Company PP-45-1

  12. PP-94 Central Power & Light Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Central Power & Light Company PP-94 Central Power & Light Company Presidental Permit authorizing Central Power & Light Company to construct, operate, and maintain electric transmission facilities at the U.S. - Mexico Border. PDF icon PP-94 Central Power & Light Company More Documents & Publications PP-92 El Paso Electric Company (EPE) PP-82 Vermont Electric Power Company, Inc. (VELCO)

  13. Facile route to hierarchical silver microstructures with high catalytic activity for the reduction of p-nitrophenol

    SciTech Connect (OSTI)

    Gu, Sasa; Wang, Wei Tan, Fatang; Gu, Jian; Qiao, Xueliang; Chen, Jianguo

    2014-01-01

    Graphical abstract: - Highlights: • A facile route was developed to prepare hierarchical silver microstructures. • The shape and size of secondary units can be tailed by varying reaction conditions. • Hierarchical silver microstructures have excellent catalytic activity. • The morphology and crystallinity of silver particles affect the catalytic activity. - Abstract: A facile, cost-effective and environmentally friendly route was developed to synthesize hierarchical silver microstructures consisting of different shaped secondary units through reducing concentrated silver nitrate with ascorbic acid in the absence of any surfactant. The as-obtained samples were characterized by X-ray diffraction (XRD), field-emission scanning electron microscopy (FESEM) and transmission electron microscopy (TEM). The investigation on the morphology evolution revealed that the molar ratio of ascorbic acid to silver nitrate was critical to control the shape of secondary structures. The length of plate-like secondary structures which composed hierarchical silver particles could be controlled by changing the reactant concentrations, and it had a key relationship with the catalytic activity for the reduction of p-nitrophenol by NaBH{sub 4}. The catalytic activity of these surfactant-free silver microstructures was about ten times higher than that of silver nanoparticles, and even comparable to that of gold nanoplates, which indicates that the as-obtained silver microstructures are very promising candidates for the catalytic reduction of p-nitrophenol due to the simple synthesis route and high catalytic activity.

  14. NREL: Transmission Grid Integration - News

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News The following news items represent work being done by the National Renewable Energy Laboratory (NREL). February 18, 2016 NREL Power Systems Engineering Researchers Publish 33 Articles in Last Year NREL's Power Systems Engineering Center published 33 journal and magazine articles in the past year highlighting recent research in integrating renewable energy into power systems. January 28, 2016 NREL and Partners Demonstrate First-of-a-Kind Use of Utility-Scale PV for Ancillary Services

  15. EA-1849: Department of Energy Loan Guarantee to Ormat Nevada, Inc. for a Geothermal Power Facility in Nevada

    Broader source: Energy.gov [DOE]

    Ormat Nevada Inc. (ORMAT), through its subsidiaries, proposes to construct and operate three geothermal power production facilities and associated power transmission lines in northern Nevada. The...

  16. Present state-of-the-art of transmission line icing

    SciTech Connect (OSTI)

    Pohlman, J.C.; Landers, P.

    1982-08-01

    Icing of overhead power lines is a serious problem for electric utilities. The loads resulting from iced conductors take many forms. Existing Codes and Guides offer little help in establishing adequate design criteria. Each transmission line designer must, therefore, rely heavily on intuitive judgment to set performance levels for transmission lines to be built within his particular service area. A special study was undertaken by author Pohlman in behalf of the Electric Power Research Institute (EPRI) to accomplish the following objectives: Improve the general understanding of the total problem; Sample utility perceptions and experience with the problem; Accumulate and review professional opinion on the subject; Inventory past and on-going research activities; Consolidate the above into a definition of the present state-of-the-art to define the need for future research.

  17. NREL: Transmission Grid Integration - Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Researchers are exploring the potential impacts of higher penetrations of solar and wind power on system operations. Our projects provide insights that enable improved and ...

  18. OpenEI Community - transmission

    Open Energy Info (EERE)

    p> http:en.openei.orgcommunityblogwhat-do-you-know-about-gridcomments black out brown out bulk power system electricity grid future grid grid history security Smart Grid...

  19. Sandia Energy Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    eer-of-the-year-awardsfeed 0 Sandian Contributes to Western Electricity Coordinating Council Photovoltaic Power Plant Model Validation Guideline http:energy.sandia.gov...

  20. Defect tolerant transmission lithography mask

    DOE Patents [OSTI]

    Vernon, Stephen P.

    2000-01-01

    A transmission lithography mask that utilizes a transparent substrate or a partially transparent membrane as the active region of the mask. A reflective single layer or multilayer coating is deposited on the membrane surface facing the illumination system. The coating is selectively patterned (removed) to form transmissive (bright) regions. Structural imperfections and defects in the coating have negligible effect on the aerial image of the mask master pattern since the coating is used to reflect radiation out of the entrance pupil of the imaging system. Similarly, structural imperfections in the clear regions of the membrane have little influence on the amplitude or phase of the transmitted electromagnetic fields. Since the mask "discards," rather than absorbs, unwanted radiation, it has reduced optical absorption and reduced thermal loading as compared to conventional designs. For EUV applications, the mask circumvents the phase defect problem, and is independent of the thermal load during exposure.

  1. Wave transmission over submerged breakwaters

    SciTech Connect (OSTI)

    Kobayashi, N.; Wurjanto, A. )

    1989-09-01

    Monochromatic wave reflection and transmission over a submerged impermeable breakwater is predicted numerically by slightly modifying the numerical model developed previously for predicting wave reflection and run-up on rough or smooth impermeable slopes. The slight modification is related to the landward boundary condition required for the transmitted wave propagating landward. In addition to the conservation equations of mass and momentum used to compute the flow field, an equation of energy is derived to estimate the rate of energy dissipation due to wave breaking. The computed reflection and transmission coefficients are shown to be in agreement with available small-scale test data. The numerical model also predicts the spatial variation of the energy dissipation, the mean water level difference, and the time-averaged volume flux per unit width, although available measurements are not sufficient for evaluating the capabilities and limitations of the numerical model for predicting these quantities.

  2. PP-85-3 Boliden Power Limited | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Power Limited to construct, operate, and maintain transmission facilities at the U.S. - Canada Border. PDF icon PP 85-3 Boliden Power Limited More Documents & Publications PP-85-2 ...

  3. In Situ Transmission Electron Microscopy

    Office of Scientific and Technical Information (OSTI)

    In Situ Transmission Electron Microscopy Katherine Jungjohann & Yang Liu Sandia National Laboratories, Albuquerque, New Mexico 87185 cint.lanl.gov * Adjustable HT: 100-300 kV * EDAX EDS Detector * Gatan Tridiem GIF * ADF STEM Detector * HAADF STEM Detector * BF STEM Detector * 2.0 A resolution in TEM * 1.9 A resolution in STEM * High resolution videos using Gatan Ultrascan CCD camera * Simultaneous BF and HAADF STEM imaging * EDS and EELS mapping * Energy-filtered imaging Sample Preparation

  4. NREL: Transmission Grid Integration - Webmaster

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Webmaster Please enter your name and email address in the boxes provided, and then type your message below. When you are finished, click the "Send Message" button. NOTE: If you enter your email address incorrectly, we will be unable to reply. Your name: Your email address: Your message: Send Message Printable Version Transmission Grid Integration Home Issues Projects Research Staff Working with Us Publications Webinars Data & Resources News Did you find what you needed? Yes 1 No 0

  5. Recovery Act Interconnection Transmission Planning

    Broader source: Energy.gov [DOE]

    Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

  6. Midwest Transmission Workshop II Summary

    SciTech Connect (OSTI)

    Kevin Bryan

    2002-12-05

    OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

  7. Coiled transmission line pulse generators

    DOE Patents [OSTI]

    McDonald, Kenneth Fox

    2010-11-09

    Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

  8. High power microwave generator

    DOE Patents [OSTI]

    Ekdahl, Carl A. (Albuquerque, NM)

    1986-01-01

    A microwave generator efficiently converts the energy of an intense relativistic electron beam (REB) into a high-power microwave emission using the Smith-Purcell effect which is related to Cerenkov radiation. Feedback for efficient beam bunching and high gain is obtained by placing a cylindrical Smith-Purcell transmission grating on the axis of a toroidal resonator. High efficiency results from the use of a thin cold annular highly-magnetized REB that is closely coupled to the resonant structure.

  9. High power microwave generator

    DOE Patents [OSTI]

    Ekdahl, C.A.

    1983-12-29

    A microwave generator efficiently converts the energy of an intense relativistic electron beam (REB) into a high-power microwave emission using the Smith-Purcell effect which is related to Cerenkov radiation. Feedback for efficient beam bunching and high gain is obtained by placing a cylindrical Smith-Purcell transmission grating on the axis of a toroidal resonator. High efficiency results from the use of a thin cold annular highly-magnetized REB that is closely coupled to the resonant structure.

  10. PowerPoint Presentation

    Energy Savers [EERE]

    ISO New England Comments on the National Electric Transmission Congestion Study Department of Energy Workshop Philadelphia, PA December 6, 2011 Michael I. Henderson Director Regional Planning and Coordination, System Planning DOE Workshop - December 6, 2011 © 2011 ISO New England Inc. Key Facts About New England's Electric Power System and Wholesale Electricity Markets 2 6.5 million households and businesses; population 14 million Over 300 generators totaling 32,000 MW of capacity Over 8,000

  11. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Danny Johnson Named Director of Maintenance Danny Johnson Named Director of Maintenance Danny Johnson Danny Johnson has been selected as Director of the Division of Maintenance at Southwestern Power Administration (Southwestern), effective July 13, 2014. Johnson has been with the agency since 1986 as an Electrical/Electronics Engineer and has extensive experience in the management of substation, transmission, and communications projects. Johnson began his Southwestern career in 1985 as an intern

  12. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Changing Utility Industry Prompts Realignment of Resources With the onset of energy markets, increased regulation, clean energy trends, and efforts to modernize the transmission grid, the utility industry is being challenged to keep up. According to Southwestern Power Administration (Southwestern) Administrator Chris Turner, Southwestern, too, has found itself responding to meet the challenges of a shifting business environment. Organizational Realignment "Our people are our greatest

  13. United Power- Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    United Power, together with Tri-State Generation and Transmission (TSGT), offers rebates for the installation of a variety of energy efficient equipment including heating and cooling systems, water...

  14. PG&E Trading-Power

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... the same principles of comparable open access and non-discrimination that apply to transmission in interstate commerce. (See Enron Power Marketing, Inc., 77 FERC 61,013 (1996)). ...

  15. The price of commitment in online stochastic vehicle routing

    SciTech Connect (OSTI)

    Bent, Russell W; Van Hentenryck, Pascal

    2009-01-01

    This paper considers online stochastic multiple vehicle routing with time windows in which requests arrive dynamically and the goal is to maximize the number of serviced customers. Early work has focused on very flexible routing settings where the decision to assign a vehicle to a customer is delayed until a vehicle is actually deployed to the customer. Motivated by real applications that require stability in the decision making, this paper considers a setting where the decision to assign a customer request to a vehicle must be taken when that request is accepted. Experimental results suggest that this constraint severely degrades the performance of existing algorithms. However, the paper shows how the use of stochastic information for vehicle assignment and request acceptance improves decision quality considerably. Moreover, the use of resource augmentation quantifies precisely the cost of commitment in online vehicle routing.

  16. PP-362 Champlain Hudson Power Express, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Champlain Hudson Power Express, Inc. PP-362 Champlain Hudson Power Express, Inc. Presidential Permit authorizing Champlain Hudson Power Express, Inc. (CHPEI) to construct, operate and maintain electric transmission facilities at the U.S. - Canada border. PDF icon PP-362 CHPE FINAL.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc.: Record of Decision for Issuing a Presidential Permit for the CHPE Transmission Line

  17. Utah/Transmission | Open Energy Information

    Open Energy Info (EERE)

    all of these service territories. Intermountain Power Agency, Western Area Power Administration, Bonneville Power Association, Western Area Power Administration, Columbia Grid,...

  18. NREL: Water Power Research - Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grid Integration High-voltage transmission lines and towers silouetted against a blue sky with the first glow of the rising sun on the horizon behind them. The national need for transmission improvements will have a direct impact on the effective use of renewable energy sources. For marine and hydrokinetic technologies to play a larger role in supplying the nation's energy needs, integration into the U.S. power grid is an important challenge to address. Efficient integration of variable power

  19. EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billings, Williams, McKenzie, and Mountrail Counties, North Dakota

    Broader source: Energy.gov [DOE]

    USDA Rural Utilities Service prepared an EIS that evaluates the potential environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE’s Western Area Power Administration, a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to Western’s transmission system.

  20. A New Route to Nanoscale Conducting Channels in Insulating Oxides

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A New Route to Nanoscale Conducting Channels in Insulating Oxides A New Route to Nanoscale Conducting Channels in Insulating Oxides Print Wednesday, 29 August 2012 00:00 Two-dimensional electron gases (2DEGs)-narrow conducting channels at the surfaces and interfaces of semiconductor materials-are the bedrock of conventional electronics. The startling 2004 discovery that such 2DEGs could be engineered at the interface between two insulating transition-metal oxides, SrTiO3 and LaAlO3, initiated a

  1. EIS-0129: New England/Hydro-Quebec 450 kV Transmission Line Interconnection- Phase II

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration issued this EIS to explore the impacts of amending Presidential Permit PP-76 to allow the Vermont Electrical Company to operate at power levels above those stipulated in the permit and to build additional transmission facilities to distribute the increased power. Phase I of this project is detailed in EIS-0103.

  2. Transmission Infrastructure Investment Projects (2009) | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Transmission Infrastructure Investment Projects (2009) More Documents & Publications Financial Institution Partnership Program - Commercial Technology Renewable Energy Generation...

  3. California - Establishing Transmission Project Review Streamlining...

    Open Energy Info (EERE)

    Regulatory Guidance - Supplemental Material: California - Establishing Transmission Project Review Streamlining DirectivesPermittingRegulatory GuidanceSupplemental Material...

  4. NREL: Measurements and Characterization - Transmission/Scanning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Electron Microscopy Transmission/Scanning Transmission Electron Microscopy In transmission electron microscopy (TEM), a thin sample, typically less than 200 nm, is bombarded by a highly focused beam of single-energy electrons. The beam has enough energy for the electrons to be transmitted through the sample, and the transmitted or scattered electron signal is greatly magnified by a series of electromagnetic lenses. The magnified signal may be observed by electron diffraction,

  5. Agenda: Electricity Transmission and Distribution- East

    Broader source: Energy.gov [DOE]

    Quadrennial Energy Review Public Meeting in Newark, NJ. September 8, 2014. Electricity Transmission and Distribution - Eastern Interconnection

  6. Transmission Project Reporting FPA 216h

    Broader source: Energy.gov [DOE]

    A link to the searchable database of all transmission projects requiring Federal authorizations currently being tracked by DOE.

  7. Environmental Recommendations for Transmission Planning | Open...

    Open Energy Info (EERE)

    generation resources, energy policies, technology costs, impacts on transmission reliability, and emissions is anticipated to facilitate collaborative and comprehensive...

  8. Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues

    SciTech Connect (OSTI)

    Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

    2008-07-01

    California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

  9. QER- Comment of American Public Power Association 6

    Broader source: Energy.gov [DOE]

    To whom it may concern: Please find attached comments jointly filed by the American Public Power Association, Large Public Power Council, and Transmission Access Policy Study Group, in relation to the issues discussed at the October 6, 2014, QER Public Stakeholder Meeting on Finance (Transmission, Storage and Distribution).

  10. PP-54 Ontario Hydro Electric Power Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Ontario Hydro Electric Power Commission PP-54 Ontario Hydro Electric Power Commission Presidential Permit authorizing Ontario Hydro Electric Power Commission to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PDF icon PP-54 Ontario Hydro Electric Power Commission More Documents & Publications PP-369 British Columbia Hydro and Power Authority PP-64 Basin Electric Power Cooperative PP-61 Minnkota Power Cooperative (MPC)

  11. U.S. Department of Energy Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    02 and 3002A Electrical Transmission Line Reconductoring Project Program or Field Office: Southwestern Power Administration Location(s) (Cit) /County/State): Butler, and Stoddard Counties, Missouri Proposed Action Description: Southwestern Power Administration proposes replace utility poles and transmission line conductor along portions of an existing transmission line to accommodate increased electrical loading and prevent electrical outages due to overloading of the electrical grid system with

  12. POWER Templates

    Broader source: Energy.gov (indexed) [DOE]

    ... 16 ELECTRIC FIELD AFFECTS ... for Electrical Transmission Line Structural Loading NA Not ... In addition, the corona losses along the line will be ...

  13. Top 9 Things You Didn't Know About America's Power Grid | Department...

    Broader source: Energy.gov (indexed) [DOE]

    power plants and transformers connected by more than 450,000 miles of high-voltage transmission lines. The basic process: Electric power is generated at power plants and then...

  14. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    SciTech Connect (OSTI)

    Kirby, Brendan J

    2006-07-01

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

  15. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, R.B.

    1985-08-15

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  16. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, Russell B.

    1987-01-01

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  17. transmission | OpenEI Community

    Open Energy Info (EERE)

    Dc(266) Contributor 31 October, 2014 - 10:58 What do you know about the grid? black out brown out bulk power system electricity grid future grid grid history security Smart Grid...

  18. The Adversarial Route Analysis Tool: A Web Application

    SciTech Connect (OSTI)

    Casson, William H. Jr.

    2012-08-02

    The Adversarial Route Analysis Tool is a type of Google maps for adversaries. It's a web-based Geospatial application similar to Google Maps. It helps the U.S. government plan operations that predict where an adversary might be. It's easily accessible and maintainble and it's simple to use without much training.

  19. Generalized chemical route to develop fatty acid capped highly dispersed semiconducting metal sulphide nanocrystals

    SciTech Connect (OSTI)

    Patel, Jayesh D.; Chemical Engineering Department, University of Laval, Quebec, QC, G1K 7P4 ; Mighri, Frej; Chemical Engineering Department, University of Laval, Quebec, QC, G1K 7P4 ; Ajji, Abdellah; Chemical Engineering Department, Ecole Polytechnique, C.P. 6079, Succ. Centre-Ville Montreal, QC, H3C 3A7

    2012-08-15

    Highlights: ► Chemical route for the synthesis of OA-capped CdS, ZnS and PbS at low temperature. ► Synthesized nanocrystals via thermolysis of their metal–oleate complexes. ► Size quantized nanocrystals were highly dispersed and stable at room temperature. -- Abstract: This work deals with the synthesis of highly dispersed semiconducting nanocrystals (NCs) of cadmium sulphide (CdS), zinc sulphide (ZnS) and lead sulphide (PbS) through a simple and generalized process using oleic acid (OA) as surfactant. To synthesize these NCs, metal–oleate (M–O) complexes were obtained from the reaction at 140 °C between metal acetates and OA in hexanes media. Subsequently, M–O complexes were sulphurized using thioacetamide at the same temperature. Transmission electron microscopy (TEM) and X-ray diffraction (XRD) characterizations show that the synthesized products are of nanoscale-size with highly crystalline cubic phase. The optical absorption of OA-capped metal sulphide NCs confirms that their size quantization induced a large shift towards visible region. Photoluminescence (PL) spectrum of CdS NCs shows a broad band-edge emission with shallow and deep-trap emissions, while PL spectrum of ZnS NCs reveals a broad emission due to defects states on the surface. The thermogravimetric analysis (TGA) and Fourier transform infrared (FTIR) spectroscopy indicate that fatty acid monolayers were bound strongly on the nanocrystal surface as a carboxylate and the two oxygen atoms of the carboxylate were coordinated symmetrically to the surface of the NCs. The strong binding between the fatty acid and the NCs surface enhances the stability of NCs colloids. In general, this generalized route has a great potential in developing nanoscale metal sulphides for opto-electronic devices.

  20. EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Program

    Broader source: Energy.gov [DOE]

    Western Area Power Administration prepared an EA that assesses potential environmental impacts of the proposed continuation of operation and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System in Arizona, California, and Nevada. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.