National Library of Energy BETA

Sample records for transmission planning initiative

  1. Interconnection-Wide Transmission Planning Initiative - Meeting...

    Energy Savers [EERE]

    Recovery Act Interconnection Transmission Planning Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning...

  2. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency...

  3. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Environmental Management (EM)

    A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the...

  4. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Environmental Management (EM)

    Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern...

  5. Interconnection-Wide Transmission Planning Initiative: Topic...

    Broader source: Energy.gov (indexed) [DOE]

    Western Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards...

  6. Renewable Energy Transmission Initiative Phase 1A

    E-Print Network [OSTI]

    Renewable Energy Transmission Initiative Phase 1A DRAFT REPORT MARCH 2008 RETI-1000-2008-001-D #12;RETI Stakeholder Steering Committee Renewable Energy Transmission Initiative Phase 1A DRAFT REPORT B are registered trademarks of Black & Veatch Holding Company #12;RETI Stakeholder Steering Committee Renewable

  7. Marketing Plan for Transmission Planning Services

    E-Print Network [OSTI]

    Tu, Linh

    2006-12-15

    in the non-consulting side of the firm, the following are services provided on the consulting side, still known as Consultation Company: ? Cogeneration services ? Energy facilities planning ? Energy supply management ? Transmission ? Utility formation... Consultation Company?s competitive advantage in the electrical industry is their experience and expertise in the energy market. The company has been working with companies and individuals to help plan, develop and build power plants for over twenty years...

  8. Factsheet: An Initiative to Help Modernize Natural Gas Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Factsheet: An Initiative to Help Modernize Natural Gas Transmission and Distribution Infrastructure Factsheet: An Initiative to Help Modernize Natural Gas Transmission and...

  9. Hanford tanks initiative plan

    SciTech Connect (OSTI)

    McKinney, K.E.

    1997-07-01

    Abstract: The Hanford Tanks Initiative (HTI) is a five-year project resulting from the technical and financial partnership of the U.S. Department of Energy`s Office of Waste Management (EM-30) and Office of Science and Technology Development (EM-50). The HTI project accelerates activities to gain key technical, cost performance, and regulatory information on two high-level waste tanks. The HTI will provide a basis for design and regulatory decisions affecting the remainder of the Tank Waste Remediation System`s tank waste retrieval Program.

  10. Transmission Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand,...

  11. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    DOE). 2006. National Electric Transmission Congestion Study.Division. 2003. Electric Transmission Plan for RenewableIdentifying Minnesota’s Electric Transmission Infrastructure

  12. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Certificates of Need for Transmission Lines to Support theand Preference in Transmission Service. ” Washington, D.C. :Integrating Wind into Transmission Planning: The Rocky

  13. Plan to Conduct Electric Transmission Congestion Study: Federal...

    Office of Environmental Management (EM)

    Plan to Conduct Electric Transmission Congestion Study: Federal Register Volume 76, No. 218 - Nov. 10, 2011 Plan to Conduct Electric Transmission Congestion Study: Federal Register...

  14. Linear relaxations for transmission system planning

    E-Print Network [OSTI]

    Taylor, Joshua A.

    We apply a linear relaxation procedure for polynomial optimization problems to transmission system planning. The approach recovers and improves upon existing linear models based on the DC approximation. We then consider ...

  15. Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission

    E-Print Network [OSTI]

    Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission Summary of Key..................................................................................................................................... 1 Northwest Transmission Planning), there was concern that there had been little progress on addressing the developing transmission issues in the region

  16. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01

    it to traditional utility planning. We then summarize theCoordination of utility transmission planning efforts helpedof planning for reliability across multiple utilities.

  17. Value-based reliability transmission planning

    SciTech Connect (OSTI)

    Dalton, J.G. III; Garrison, D.L.; Fallon, C.M.

    1996-08-01

    This paper presents a new value-based reliability planning (VBRP) process proposed for planning Duke Power Company`s (DPC) regional transmission system. All transmission served customers are fed from DPC`s regional transmission system which consists of a 44-kV predominantly radial system and a 100-kV predominantly non-radial system. In the past, any single contingency that could occur during system peak conditions and cause a thermal overload required the overloaded facility to be upgraded, regardless of the costs or the likelihood of the overload occurring. The new VBRP process is based on transmission system reliability evaluation and includes the following important elements: (1) a ten-year historical data base describing the probabilities of forced outages for lines and transformers; (2) a five-year average load duration curve describing the probability of an overload should a contingency occur; (3) a customer outage cost data base; (4) and probabilistic techniques. The new process attempts to balance the costs of improving service reliability with the benefits or value that these improvements bring to these customers. The objective is to provide the customers their required level of reliability while minimizing the Total Cost of their electric service.

  18. Biennial Assessment of the Fifth Power Plan Transmission Issues

    E-Print Network [OSTI]

    unscheduled electricity flows over transmission lines leading to increased risks to electric system-construction alternatives to transmission; · Inability to effectively monitor the wholesale electricity market, identifyBiennial Assessment of the Fifth Power Plan Transmission Issues INTRODUCTION The Fifth Power Plan

  19. Scheduling Planned Maintenance of Electrical Power Transmission Networks Using

    E-Print Network [OSTI]

    Fernandez, Thomas

    Scheduling Planned Maintenance of Electrical Power Transmission Networks Using Genetic Algorithms Technical Report: CSRP­97­26 10 November 1997 Abstract The maintenance of the electrical power transmission Plan­ ning, Electricity Transmission Networks. 1 To appear in In Gennady K. Voronovsky and Serguey A

  20. 10 Year Transmission Plan for the Western Electricity Interconnection Released

    Broader source: Energy.gov [DOE]

    The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities.

  1. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Transmission Cost Incremental Generation as Only BeneficiaryUnit of Incremental Generation Equipment Cost Assumptions2003 Least Cost Resource Plan Wind Generation. Xcel Energy

  2. Transmission investment and expansion planning in a restructured electricity market

    E-Print Network [OSTI]

    Leung, Ka-Cheong

    Transmission investment and expansion planning in a restructured electricity market F.F Wua,b , F.L. Zhengb,c , F.S. Wena,b, * a Center for Electrical Energy Systems, University of Hong Kong, Pokfulam Road, Guangzhou, 510640, China Abstract Transmission planning in a restructured electricity market becomes

  3. Transmission Expansion Planning with Re-design

    E-Print Network [OSTI]

    2010-05-17

    Expanding an electrical transmission network requires heavy investments that ... would be too complex to handle, electrical transmission and energy genera- ... Our new modelling introduces more flexibility and is general, in the sense that it ...

  4. Recovery Act Interconnection Transmission Planning | Department...

    Energy Savers [EERE]

    - are identifying transmission requirements under a broad range of alternative electricity futures (including intensive application of demand-side technologies), and...

  5. NREL: Transmission Grid Integration - Transmission Planning and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass map shines lightGeospatial ToolkitSMARTS -BeingFutureResearch StaffTransmission

  6. Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission

    E-Print Network [OSTI]

    Budhraja, Vikram

    2010-01-01

    Upgrading California’s Electric Transmission System: Issuesshould be adapted to transmission electric system planning,Mobasheri, (Electric Power Group, LLC). 2008. Transmission

  7. Generation and transmission expansion planning for renewable energy integration

    SciTech Connect (OSTI)

    Bent, Russell W; Berscheid, Alan; Toole, G. Loren

    2010-11-30

    In recent years the expansion planning problem has become increasingly complex. As expansion planning (sometimes called composite or integrated resource planning) is a non-linear and non-convex optimization problem, researchers have traditionally focused on approximate models of power flows to solve the problem. The problem has also been split into generation expansion planning (GEP) and transmission network expansion planning (TNEP) to improve computational tractability. Until recently these approximations have produced results that are straight-forward to combine and adapt to the more complex and complete problem. However, the power grid is evolving towards a state where the adaptations are no longer easy (e.g. large amounts of limited control, renewable generation, comparable generation and transmission construction costs) and necessitates new approaches. Recent work on deterministic Discrepancy Bounded Local Search (DBLS) has shown it to be quite effective in addressing the TNEP. In this paper, we propose a generalization of DBLS to handle simultaneous generation and transmission planning.

  8. AC transmission system planning choosing lines from a discrete set

    E-Print Network [OSTI]

    Gilbertson, Eric W.

    2013-04-24

    Transmission system planning (TSP) is a difficult nonlinear optimization problem involving non-convex quadratic terms, as well as discrete variables. We extend prior results for linear relaxations, drawing on a preliminary ...

  9. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01

    179c/179c9e0086c0.pdf National Wind CoordinatingTransmission Planning and Wind Energy. Issue Brief. August.and Renewable Energy, Wind & Hydropower Technologies Program

  10. Initial Studies Toward Real-Time Transmission Path Rating

    SciTech Connect (OSTI)

    Singh, Ruchi; Diao, Ruisheng; Cai, Niannian; Huang, Zhenyu; Tuck, Brian; Guo, Xinxin

    2012-07-26

    Demand continues to increase while transmission line construction is being constrained by multiple factors— economic, environmental, and political. Effective and efficient utilization of transmission lines is thus of great importance in an open access environment. Large blocks of power are transferred from areas with inexpensive generation to heavy load demand areas or areas with high generation costs. This results in some transmission paths being loaded closer to their path ratings, which limits further power transfer between areas. Traditionally, rating of important paths was determined off line by assuming the worst-case study scenario; once determined, it could be used for years. With increasing uncertainty arising from rapid growth of renewable energy and smart technologies, path rating studies are needed in near-real time to account for the latest system status and support a reliable and economic power grid. This paper adopts a simplified procedure based on standards of the North American Electric Reliability Corporation (NERC) to determine total transfer capability (TTC) or transfer limit for the purpose of demonstrating the benefits and necessity of real-time path rating. Initial studies are conducted to compute TTC of a two-area test system and a 39-bus test system. Results indicate that path rating can be significantly affected by loading conditions, generator schedules, system topology and other factors.

  11. Transmission planning in the era of integrated resource planning: A survey of recent cases

    SciTech Connect (OSTI)

    Baldick, R.; Kahn, E.P.

    1992-09-01

    State action is critical to the expansion of the high-voltage transmission network, because regulated utilities must seek approval from utility commissions for proposals to site new lines. It is the purpose of this report to survey the regulatory treatment of issues that are unique to or ubiquitous in transmission planning and use. The authors review recent transmission siting cases to examine how the issues are presented to and resolved by state regulatory commissions and to provide a perspective for more general discussion of transmission policy. Their primary focus is on planning issues. Transmission capacity expansion is not typically treated in integrated resource planning. It is usually assumed that there is adequate transmission to achieve any particular plan. The authors believe that one important reason for this omission is the inherent complexity of transmission system expansion. Regulators and competitors may be at a serious disadvantage in negotiating or adjudicating specific transmission proposals with utilities, who generally have greater knowledge of both general technological considerations and case specifics. This problem of asymmetric information must be addressed at some level in planning or dispute resolution. However, they observe that explicit consideration of the information problem is absent from most regulatory and technical analysis of transmission. The goal of this survey is to share knowledge about the problems facing state regulators over the siting of new transmission facilities, and help to define constructive approaches to them.

  12. Hanford Tanks Initiative quality assurance implementation plan

    SciTech Connect (OSTI)

    Huston, J.J.

    1998-06-23

    Hanford Tanks Initiative (HTI) Quality Assurance Implementation Plan for Nuclear Facilities defines the controls for the products and activities developed by HTI. Project Hanford Management Contract (PHMC) Quality Assurance Program Description (QAPD)(HNF-PRO599) is the document that defines the quality requirements for Nuclear Facilities. The QAPD provides direction for compliance to 10 CFR 830.120 Nuclear Safety Management, Quality Assurance Requirements. Hanford Tanks Initiative (HTI) is a five-year activity resulting from the technical and financial partnership of the US Department of Energy`s Office of Waste Management (EM-30), and Office of Science and Technology Development (EM-50). HTI will develop and demonstrate technologies and processes for characterization and retrieval of single shell tank waste. Activities and products associated with HTI consist of engineering, construction, procurement, closure, retrieval, characterization, and safety and licensing.

  13. Transmission network expansion planning with simulation optimization

    SciTech Connect (OSTI)

    Bent, Russell W [Los Alamos National Laboratory; Berscheid, Alan [Los Alamos National Laboratory; Toole, G. Loren [Los Alamos National Laboratory

    2010-01-01

    Within the electric power literatW''e the transmi ssion expansion planning problem (TNEP) refers to the problem of how to upgrade an electric power network to meet future demands. As this problem is a complex, non-linear, and non-convex optimization problem, researchers have traditionally focused on approximate models. Often, their approaches are tightly coupled to the approximation choice. Until recently, these approximations have produced results that are straight-forward to adapt to the more complex (real) problem. However, the power grid is evolving towards a state where the adaptations are no longer easy (i.e. large amounts of limited control, renewable generation) that necessitates new optimization techniques. In this paper, we propose a generalization of the powerful Limited Discrepancy Search (LDS) that encapsulates the complexity in a black box that may be queJied for information about the quality of a proposed expansion. This allows the development of a new optimization algOlitlun that is independent of the underlying power model.

  14. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    SciTech Connect (OSTI)

    Mills, Andrew D.; Wiser, Ryan; Porter, Kevin

    2009-02-02

    The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS and WinDS). The authors and general location of the 40 detailed transmission studies included in our review are illustrated in Figure ES-1. As discussed in the body of the report, these studies vary considerably in scope, authorship, objectives, methodology, and tools. Though we recognize this diversity and are cognizant that comparisons among these studies are therefore somewhat inappropriate, we nonetheless emphasize such simple comparisons in this report. We do so in order to improve our understanding of the range of transmission costs needed to access greater quantities of wind, and to highlight some of the drivers of those costs. In so doing, we gloss over many important details and differences among the studies in our sample. In emphasizing simple comparisons, our analysis focuses primarily on the unit cost of transmission implied by each of the studies. The unit cost of transmission for wind in $/kW terms on a capacity-weighted basis is estimated by simply dividing the total transmission cost in a study by the total amount of incremental generation capacity (wind and non-wind) modeled in that study. In so doing, this metric assumes that within any individual study all incremental generation capacity imposes transmission costs in proportion to its nameplate capacity rating. The limitations to this approach are described in some detail in the body of the report.

  15. WECC releases its first-ever transmission plan for the Western Interconnection

    Broader source: Energy.gov [DOE]

    The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection.

  16. California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning

    E-Print Network [OSTI]

    Eto, Joseph; Stovall, John P.

    2003-01-01

    The Future of Electric Transmission in the United States.Environmental Impacts of Electric Transmission In order toTransmission R&D Planning Underwater application of electric

  17. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01

    Generation Outlet Electric Transmission Study. May.Identifying Minnesota’s Electric Transmission InfrastructureGeneration Outlet Electric Transmission Study Xcel-31A

  18. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    additional transmission costs to new electricity generators,additional transmission costs to new electricity generators,Electricity Coordinating Council / California - 13 transmission

  19. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    building transmission to meet peak wind conditions during peak transmission usage periods, and the magnitude of curtailment may be small

  20. Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLforLDRDEnergy Copyrights ASite ForResearch,The documentsCoP)List

  1. Interconnection-Wide Transmission Planning Initiative: Topic A,

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservationEnergy5975-01TransactionsDepartmentServices

  2. Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservationEnergy5975-01TransactionsDepartmentServicesAmong States

  3. Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservationEnergy5975-01TransactionsDepartmentServicesAmong

  4. Interconnection-Wide Transmission Planning Initiative: Topic B, State

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservationEnergy5975-01TransactionsDepartmentServicesAmongAgency

  5. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    in Transmission Service. ” Washington, D.C. : Federal EnergyNational Transmission Grid Study. Washington, D.C. : U.S.California Transmission Options Study NTAC - 2A Submarine DC

  6. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01

    A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROMof establishing a wind transmission cost adder with respectthat involve wind and divide the cost by the relative share

  7. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Generation and Transmission and Western Area Power Administration Clean and Diversified Energy Advisory Committee (CDEAC) Transmission Task Force NorthWestern Energy ElectricGeneration and Transmission and Western Area Power Administration Clean and Diversified Energy Advisory Committee (CDEAC) Transmission Task Force NorthWestern Energy Electric

  8. The transmission dynamics of syphilis and the CDC's elimination plan Romulus Breban1

    E-Print Network [OSTI]

    Blower, Sally

    1 The transmission dynamics of syphilis and the CDC's elimination plan Romulus Breban1 , Virginie that their control strategies will be effective it is important to understand the transmission dynamics of syphilis), and the analysis of a syphilis transmission model. We use spectral analysis to reanalyze the CDC's data set

  9. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    Impact 12% Renewables (TWh/yr) Geothermal Biomass Resource Composition Hydro Wind SolarImpact 12% Renewables (TWh/yr) Geothermal Biomass Resource Composition Hydro Wind Solarwind and solar in resource portfolios should be explicitly considered in alternative transmission planning scenarios. The impact

  10. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    on U.S. Wind Power Installation, Cost, and PerformanceTransmission ($/kW-wind) Unit Cost (Capacity-weighted) Windof Transmission ($/MWh- wind) Unit Cost (Capacity-weighted)

  11. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Annual Report on U.S. Wind Power Installation, Cost, andcost of transmission implied by this study is $207/kW-wind (U.S.lead us to overstate the unit cost of transmission for wind.

  12. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    NREL/CP-500-35969. Global WindPower Conference. Chicago,Transmission Projects. ” Windpower 2007 Conference. Los

  13. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Mexico to Arizona January 2008 SWAT Transmission to access renewable resource zones in Arizona NorthWestern Energy

  14. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    2006. Transmission and Wind Energy: Capturing the Prevailingand Renewable Energy (Wind & Hydropower Technologiesand Renewable Energy Wind & Hydropower Technologies Program

  15. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01

    transmission upgrades do not involve building new lines, such as DCD.C. , June. Available at: http://www.eei.org/industry_issues/energy_infrastructure/transmission/DC converters between links. Traditionally, utilities have been responsible for ensuring that the local transmission

  16. Capricious Cables: Understanding the Key Concepts in Transmission Expansion Planning and Its Models

    SciTech Connect (OSTI)

    Donohoo, P.; Milligan, M.

    2014-06-01

    The extra-high-voltage transmission network is the bulk transport network of the electric power system. To understand how the future power system may react to planning decisions today, wide-area transmission models are increasingly used to aid decision makers and stakeholders. The goal of this work is to illuminate these models for a broader audience that may include policy makers or relative newcomers to the field of transmission planning. This paper explains the basic transmission expansion planning model formulation. It highlights six of the major simplifications made in transmission expansion planning models and the resulting need to contextualize model results using knowledge from other models and knowledge not captured in the modeling process.

  17. Microsoft Word - DOE RFI on Transmission Planning - PGE Comments...

    Broader source: Energy.gov (indexed) [DOE]

    California. PG&E engages in the businesses of electricity and natural gas distribution, electricity generation, procurement and transmission, and natural gas procurement,...

  18. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Estimates of Congestion Costs. The Electricity Journal 17,Incremental Transmission Costs Due to Wind Power. Rockville,and Intermittency Really Cost? Supply Curves for Electricity

  19. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    SciTech Connect (OSTI)

    Kirby, Brendan J

    2006-07-01

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

  20. Transmission System Expansion Plans in View Point of Deterministic, Probabilistic and Security Reliability Criteria

    E-Print Network [OSTI]

    Transmission System Expansion Plans in View Point of Deterministic, Probabilistic and Security reliability criterion, probabilistic reliability criterion and security criterion based on N- contingency control system as well as reasonable strength of grid originally. Because investment for power system

  1. Department of Industrial Engineering Fall 2011 Transmission Component Reverse Engineering and Process Planning

    E-Print Network [OSTI]

    Demirel, Melik C.

    PENNSTATE Department of Industrial Engineering Fall 2011 Transmission Component Reverse Engineering to fabricate the parts in the Industrial Engineering Department Factory for Advanced Manufacturing Education of the transmission to reverse engineer and develop process plans for efficient fabrication in a low volume setting

  2. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    SciTech Connect (OSTI)

    Mills, Andrew; Phadke, Amol; Wiser, Ryan

    2010-02-16

    Building transmission to reach renewable energy (RE) goals requires coordination among renewable developers, utilities and transmission owners, resource and transmission planners, state and federal regulators, and environmental organizations. The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this report we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33% of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Of the renewable resources in WREZ resource hubs, and under the assumptions described in this report, our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33% RE target across nearly all scenarios analyzed (38-65%). Solar energy is almost always the second largest source (14-41%). Solar exceeds wind by a small margin only when solar thermal energy is assumed to experience cost reductions relative to all other technologies. Biomass, geothermal, and hydropower are found to represent a smaller portion of the selected resources, largely due to the limited resource quantity of these resources identified within the WREZ-identified hubs (16-23% combined). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Uncertainties and policies that impact bus-bar costs are the most important to evaluate carefully, but factors that impact transmission costs and the relative market value of each renewable option can also be important. Under scenarios in which each load zone must meet 33% of its load with delivered renewable energy from the WREZ-identified resource hubs, the total transmission investment required to meet the 33% west-wide RE target is estimated at between $22 billion and $34 billion. Although a few of the new transmission lines are very long - over 800 miles - most are relatively short, with average transmission distances ranging from 230-315 miles, depending on the scenario. Needed transmission expenditure are found to decline to $17 billion if wide use of renewable energy credits is allowed; consideration of renewable resources outside of WREZ-identified hubs would further reduce this transmission cost estimate. Even with total transmission expenditures of $17-34 billion, however, these costs still represent just 10-19% of the total delivered cost of renewable energy.

  3. 1394 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 4, NOVEMBER 2007 Economic Criteria for Planning Transmission

    E-Print Network [OSTI]

    Oren, Shmuel S.

    for Planning Transmission Investment in Restructured Electricity Markets Enzo E. Sauma, Member, IEEE. In reality, however, since the impacts of an electricity transmission project on different players may vary that should be considered when planning electricity transmission investments. We propose an electricity

  4. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    physics of electricity flow in transmission networks. Thefact that the electricity lost through transmission lines isthe resulting electricity to the nearest transmission system

  5. Abstract--This paper proposes an optimization based method of planning reactive power control for electric transmission

    E-Print Network [OSTI]

    Kumar, Ratnesh

    for electric transmission systems to endow them with the capability of being reconfigured to a secure of the electric transmission system. There are three basic options for strengthening transmission systems: (1-term planning to strengthen transmission capability is necessary to increase future reliability levels

  6. Transmission/Resource Library/Planning | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al., 2013)OpenEnergyTrail Canyon GeothermalTransmissionLibrary/MOUPlanning

  7. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  8. The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.

    E-Print Network [OSTI]

    Wiser, Ryan

    2014-01-01

    on U. S . Wind Power Installation, Cost, and Performance30% wind penetration. Wind transmission costs in the severalof Transmission ($/kW-wind) Unit Cost of Transmission ($/

  9. Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01

    Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

  10. Neutron Resonance Transmission Analysis (NRTA): A Nondestructive Assay Technique for the Next Generation Safeguards Initiative’s Plutonium Assay Challenge

    SciTech Connect (OSTI)

    J. W. Sterbentz; D. L. Chichester

    2010-12-01

    This is an end-of-year report for a project funded by the National Nuclear Security Administration's Office of Nuclear Safeguards (NA-241). The goal of this project is to investigate the feasibility of using Neutron Resonance Transmission Analysis (NRTA) to assay plutonium in commercial light-water-reactor spent fuel. This project is part of a larger research effort within the Next-Generation Safeguards Initiative (NGSI) to evaluate methods for assaying plutonium in spent fuel, the Plutonium Assay Challenge. The first-year goals for this project were modest and included: 1) developing a zero-order MCNP model for the NRTA technique, simulating data results presented in the literature, 2) completing a preliminary set of studies investigating important design and performance characteristics for the NRTA measurement technique, and 3) documentation of this work in an end of the year report (this report). Research teams at Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Pacific Northwest National Laboratory (PNNL), and at several universities are also working to investigate plutonium assay methods for spent-fuel safeguards. While the NRTA technique is well proven in the scientific literature for assaying individual spent fuel pins, it is a newcomer to the current NGSI efforts studying Pu assay method techniques having just started in March 2010; several analytical techniques have been under investigation within this program for two to three years or more. This report summarizes a nine month period of work.

  11. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    Marginal Production Cost Generation as Percent of Resourcezone (considering generation costs and transmission costs),about transmission costs and different generation profiles.

  12. September 24, 2014 Delaware Will Shine Strategic Planning Initiative

    E-Print Network [OSTI]

    Firestone, Jeremy

    1 September 24, 2014 Delaware Will Shine Strategic Planning: CONCEPT PAPER NOTE: The goal of this strategic planning working group CORE VALUES are offered by this strategic planning working group

  13. 1620 IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 27, NO. 3, JULY 2012 Hybrid AC/DC Transmission Expansion Planning

    E-Print Network [OSTI]

    Fu, Yong

    1620 IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 27, NO. 3, JULY 2012 Hybrid AC/DC Transmission--This paper proposes a hybrid algorithm for the ac/dc transmission expansion planning (TEP). The stochastic simulation method would consider random outages of generating units and ac/dc transmission lines as well

  14. Policy Flash 2014-39 Initiatives to Achieve Strategic Plan 2014...

    Energy Savers [EERE]

    to Achieve Strategic Plan 2014-2018 Performance Goal Focused on Cost Savings Policy Flash 2014-39 Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused...

  15. National Electric Transmission Congestion Study Webinars | Department...

    Energy Savers [EERE]

    Services Electricity Policy Coordination and Implementation Transmission Planning National Electric Transmission Congestion Study National Electric Transmission...

  16. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    Hild. 2004. “The Value of Wind Energy as a Function of Wind2: Capacity credit. ” Wind Energy 3(4): 167–206. Milligan,of Transmission for Wind Energy: A Review of Transmission

  17. Energy-water analysis of the 10-year WECC transmission planning study cases.

    SciTech Connect (OSTI)

    Tidwell, Vincent Carroll; Passell, Howard David; Castillo, Cesar; Moreland, Barbara

    2011-11-01

    In 2011 the Department of Energy's Office of Electricity embarked on a comprehensive program to assist our Nation's three primary electric interconnections with long term transmission planning. Given the growing concern over water resources in the western U.S. the Western Electricity Coordinating Council (WECC) requested assistance with integrating water resource considerations into their broader electric transmission planning. The result is a project with three overarching objectives: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western Interconnection to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Western States Water Council (WSWC) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and WSWC. The foundation for the Energy-Water DSS is Sandia National Laboratories Energy-Power-Water Simulation (EPWSim) model (Tidwell et al. 2009). The modeling framework targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. This framework provides an interactive environment to explore trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., state, county, watershed, interconnection). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. The framework currently supports modules for calculating water withdrawal and consumption for current and planned electric power generation; projected water demand from competing use sectors; and, surface and groundwater availability. WECC's long range planning is organized according to two target planning horizons, a 10-year and a 20-year. This study supports WECC in the 10-year planning endeavor. In this case the water implications associated with four of WECC's alternative future study cases (described below) are calculated and reported. In future phases of planning we will work with WECC to craft study cases that aim to reduce the thermoelectric footprint of the interconnection and/or limit production in the most water stressed regions of the West.

  18. Moving Beyond Paralysis: How States and Regions Are Creating Innovative Transmission Projects

    SciTech Connect (OSTI)

    Schumacher, A.; Fink, S.; Porter, K.

    2009-10-01

    This report profiles certain state and regional transmission policy initiatives aimed at promoting transmission development, mainly to access renewable resources – including renewable energy zones, location-constrained tariffs, open seasons, and balanced portfolio plans. In particular, this article focuses on transmission initiatives intended to plan and build transmission in advance of new generation, instead of waiting for enough planned new generation to justify the development of a new transmission line of sufficient capability.

  19. Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission

    E-Print Network [OSTI]

    Budhraja, Vikram

    2010-01-01

    impacts of new electricity transmission projects generallyof high- voltage electricity transmission projects, such asby others. Electricity transmission facilities fit these

  20. EM's Strategic Planning Initiative Examines Impact of Lower Funding Targets

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM is conducting a strategic planning effort that aims to optimize progress in the organization’s environmental cleanup program.

  1. Transmission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired SolarAbout / Transforming Y-12 Transforming Y-12ComplexTransmission

  2. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    high-quality renewable energy resources in environmentallyWREZ- identified renewable energy resource hubs. The secondon renewable energy resource selection, transmission

  3. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    from existing state renewable energy policy requirements,renewable energy procurement, technology cost, transmission, and policypolicies (including renewable development and energy

  4. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    from existing state renewable energy policy requirements,for renewable energy to different assumptions and policiesrenewable energy procurement, technology cost, transmission, and policy

  5. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    operating costs, and substation costs for substations thatsubstation, and are derived from a simple levelized-cost-of-above) transmission substation. Capital costs vary for the

  6. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    reduction in average renewable energy costs WECC-wide byto reduce the average renewable energy costs WECC-wide byscenarios on renewable energy supply costs and transmission

  7. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    SciTech Connect (OSTI)

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  8. The Effect of Municipal Initiatives on State Climate Change Plans

    E-Print Network [OSTI]

    Fenton, Barbara Parsons

    2009-08-11

    Faced with near-unanimous scientific consensus that climate change is being accelerated by human activity and no decisive federal policy on the issue, U.S. states and municipalities are taking the initiative to mitigate ...

  9. Renewable Electricity Futures Study Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning

    Office of Energy Efficiency and Renewable Energy (EERE)

    This volume focuses on the role of variable renewable generation in creating challenges to the planning and operations of power systems and the expansion of transmission to deliver electricity from remote resources to load centers. The technical and institutional changes to power systems that respond to these challenges are, in many cases, underway, driven by the economic benefits of adopting more modern communication, information, and computation technologies that offer significant operational cost savings and improved asset utilization. While this volume provides background information and numerous references, the reader is referred to the literature for more complete tutorials.

  10. 2008, Illinois GIS Strategic Planning Committee The Illinois Statewide GIS Initiative will provide the vision for

    E-Print Network [OSTI]

    Frank, Thomas D.

    © 2008, Illinois GIS Strategic Planning Committee The Illinois Statewide GIS Initiative will provide the vision for GIS leadership, coordination and services to public and private entities by a tactical agency that implements the GIS initiatives is envisioned. The appointment of an Illinois GIO

  11. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    Colorado: National Renewable Energy Laboratory. NREL/SR-Decisions in the Western Renewable Energy Zone Initiative.Finn, J. 2009. Western Renewable Energy Zones, Phase 1: QRA

  12. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    Colorado: National Renewable Energy Laboratory. NREL/SR-Decisions in the Western Renewable Energy Zone Initiative.Moore, and C.K. Woo. 2009. “Renewable Portfolio Standards,

  13. Concurrent Probabilistic Temporal Planning : Initial Results Mausam and Daniel S. Weld

    E-Print Network [OSTI]

    Concurrent Probabilistic Temporal Planning : Initial Results Mausam and Daniel S. Weld Dept of Computer Science and Engineering University of Washington Seattle, WA-98195 {mausam,weld & Weld 2004)) to efficiently solve concurrent MDPs with actions of unit length. The focus of this paper

  14. Concurrent Probabilistic Temporal Planning : Initial Results Mausam and Daniel S. Weld

    E-Print Network [OSTI]

    Mausam

    Concurrent Probabilistic Temporal Planning : Initial Results Mausam and Daniel S. Weld Dept of Computer Science and Engineering University of Washington Seattle, WA­98195 {mausam,weld & Weld 2004)) to efficiently solve concurrent MDPs with actions of unit length. The focus of this paper

  15. Energy Security, Innovation & Sustainability Initiative Prioritize.A 100-Day Energy Action Plan

    E-Print Network [OSTI]

    Energy Security, Innovation & Sustainability Initiative Prioritize.A 100-Day Energy Action Plan recognizes that energy will be a defining challenge for the new Administration--for economic competitiveness, national security and long-term environmental sus- tainability. Energy price and supply volatility impact

  16. Phased Startup Initiative Phases 3 and 4 Test Plan and Test Specification (OCRWM)

    SciTech Connect (OSTI)

    PITNER, A.L.

    2000-02-28

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. These tests are described in separate planning documents. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: (1) Define the test scope for the FRS and IWTS; (2) Provide detailed test requirements that can be used to write the specific test procedures; (3) Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and (4) Define specific test objectives and acceptance criteria.

  17. Breckinridge Project, initial effort. Report VII, Volume 4. Safety and health plan

    SciTech Connect (OSTI)

    none,

    1982-01-01

    The Safety and Health Plan recognizes the potential hazards associated with the Project and has been developed specifically to respond to these risks in a positive manner. Prevention, the primary objective of the Plan, starts with building safety controls into the process design and continues through engineering, construction, start-up, and operation of the Project facilities and equipment. Compliance with applicable federal, state, and local health and safety laws, regulations, and codes throughout all Project phases is required and assured. The Plan requires that each major Project phase be thoroughly reviewed and analyzed to determine that those provisions required to assure the safety and health of all employees and the public, and to prevent property and equipment losses, have been provided. The Plan requires followup on those items or situations where corrective action needs were identified to assure that the action was taken and is effective. Emphasis is placed on loss prevention. Exhibit 1 provides a breakdown of Ashland Synthetic Fuels, Inc.'s (ASFI's) Loss Prevention Program. The Plan recognizes that the varied nature of the work is such as to require the services of skilled, trained, and responsible personnel who are aware of the hazards and know that the work can be done safely, if done correctly. Good operating practice is likewise safe operating practice. Training is provided to familiarize personnel with good operational practice, the general sequence of activities, reporting requirements, and above all, the concept that each step in the operating procedures must be successfully concluded before the following step can be safely initiated. The Plan provides for periodic review and evaluation of all safety and loss prevention activities at the plant and departmental levels.

  18. California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning

    SciTech Connect (OSTI)

    Eto, Joseph; Stovall, John P.

    2003-04-01

    The California Energy Commission directed the Consortium for Electric Reliability Technology Solutions to analyze possible future scenarios for the California electricity system and assess transmission research and development (R&D) needs, with special emphasis on prioritizing public-interest R&D needs, using criteria developed by the Energy Commission. The scenarios analyzed in this report are not predictions, nor do they express policy preferences of the project participants or the Energy Commission. The public-interest R&D needs that are identified as a result of the analysis are one input that will be considered by the Energy Commission's Public Interest Energy Research staff in preparing a transmission R&D plan.

  19. California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning

    E-Print Network [OSTI]

    Eto, Joseph; Stovall, John P.

    2003-01-01

    Impacts of Electricity Transmission Scenario Analysis forImpacts of Electricity Transmission Scenario Analysis forhas also commissioned Electricity Transmission Research and

  20. Initial

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACT EVALUATION PLAN FOR0987P Uncertainty inInhibiting

  1. Phase Startup Initiative Phases 3 and 4 Test Plan and Test Specification ( OCRWM)

    SciTech Connect (OSTI)

    PAJUNEN, A.L.; LANGEVIN, M.J.

    2000-08-07

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: Define the Phase 3 and 4 test scope for the FRS and IWTS; Provide detailed test requirements that can be used to write the specific test procedures; Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and Define specific test objectives and acceptance criteria.

  2. Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission

    E-Print Network [OSTI]

    Budhraja, Vikram

    2010-01-01

    renewable and fuel based), new transmission, and energy conservation. Extreme- Event Benefits (Renewable Energy and Energy Efficiency Stakeholder Consensus – Delphi Approach Assemble stakeholders Define societal benefitrenewable energy resources and reduce greenhouse gas emissions. Incorporating more formal evaluations of these important benefits

  3. Improving Electricity Resource-Planning Processes by Consideringthe Strategic Benefits of Transmission

    SciTech Connect (OSTI)

    Budhraja, Vikram; Mobasheri, Fred; Ballance, John; Dyer, Jim; Silverstein, Alison; Eto, Joseph

    2009-03-02

    Current methods of evaluating the economic impacts of new electricity transmission projects fail to capture the many strategic benefits of these projects, such as those resulting from their long life, dynamic changes to the system, access to diverse fuels, and advancement of public policy goals to integrate renewable-energy resources and reduce greenhouse gas emissions.

  4. Transmission Planning Process and Opportunities for Utility-Scale Solar Engagement within the Western Electricity Coordinating Council (WECC)

    SciTech Connect (OSTI)

    Hein, J.; Hurlbut, D.; Milligan, M.; Coles, L.; Green, B.

    2011-11-01

    This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. Market barriers unrelated to technology often limit the expansion of utility-scale solar power, even in areas with exceptional resource potential. Many of these non-technical barriers have to do with policy, regulation, and planning, and hardly ever do they resolve themselves in a timely fashion. In most cases, pre-emptive intervention by interested stakeholders is the easiest way to remove/address such barriers, but it requires knowing how to navigate the institutional waters of the relevant agencies and boards. This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. It focuses on the Western Interconnection (WI), primarily because the quality of solar resources in the Southwest makes utility-scale concentrating solar power (CSP) and photovoltaics (PV) economically feasible, and because the relevant institutions have evolved in a way that has opened up opportunities for removing non-technical market barriers. Developers will find in this report a high-level field manual to identify the venues for mitigating and possibly eliminating systemic market obstacles and ensuring that the economic playing field is reasonably level. Project-specific issues such as siting for transmission and generation resources are beyond the scope of this report. Instead, the aim is to examine issues that pervasively affect all utility-scale PV and CSP in the region regardless of where the project may be. While the focus is on the WI, many of the institutions described here also have their counterparts in the Eastern and the Texas interconnections. Specifically, this report suggests a number of critical engagement points relating to generation and transmission planning.

  5. Planning and processing of new or upgraded electric transmission systems in New Mexico

    SciTech Connect (OSTI)

    Toole, Gasper Loren [Los Alamos National Laboratory

    2009-01-01

    RETA has been requested to identify and prioritize renewable energy resource zones in New Mexico that have a potential to support industry development among renewable energy developers for renewable resource generation projects. Moreover, Senate Memorial 44 requests that RETA identify and prioritize the best viable options for potential transmission corridors to accommodate renewable energy export from New Mexico in accordance with a defined time-line and to convene a working group to submit recommendations to the legislature for establishing a process to streamline procedures for establishing renewable energy transmission projects in New Mexico. RETA's July 9, 2009 request for comments outlined seven topical areas of specific value to Senate Memorial 44. This document addresses Topics 1, 3 and 4.

  6. Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

    SciTech Connect (OSTI)

    Casella, Amanda J.; Pereira, Mario M.; Steen, Franciska H.

    2013-01-01

    This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

  7. Next generation safeguards initiative (NGSI) program plan for safeguards by design

    SciTech Connect (OSTI)

    Demuth, Scott F [Los Alamos National Laboratory; Budlong - Sylvester, Kory [Los Alamos National Laboratory; Lockwood, Dunbar [DOE/NA-243

    2010-01-01

    Safeguards by Design (SBD) is defined as the incorporation of safeguards features early in the design phase of a new nuclear facility in order to avoid the need to redesign the facility at a later date, or retrofit the completed facility. Not only can SBD avoid the need for redesign or retrofit, but consideration of safeguards features early in the facility design effort can provide for a more efficient and effective safeguards design. A program has been initiated by the United States Department of Energy during the past several years to develop, demonstrate and institutionalization SBD. This plan has been developed in parallel with a similar effort at the IAEA while taking into account their achievements and future plans. The United States SBD program is focused on (1) identification of best practices that satisfy existing safeguards requirements, (2) identification of advanced concepts where best practices can be improved, and (3) institutionalizing SBD by gaining its acceptance as a global norm for the design of new nuclear facilities. SBD guidance documents are being prepared as an aid to industry for their design activities, to describe the relationship between requirements, best practices, and advanced concepts. SBD 'lessons learned' studies have been conducted to help identify the existing best practices and potential areas for improvement. Finally, acceptance as a global norm is being pursued by way of international workshops, engagement with industry and the IAEA, and setting an example by way of its use in new nuclear facilities in the United States.

  8. Global Threat Reduction Initiative Fuel-Thermo-Physical Characterization Project Quality Assurance Plan

    SciTech Connect (OSTI)

    Pereira, Mario M.; Slonecker, Bruce D.

    2012-06-01

    The charter of the Fuel Thermo-Physical Characterization Project is to ready Pacific Northwest National Laboratory (PNNL) facilities and processes for the receipt of unirradiated and irradiated low enriched uranium (LEU) molybdenum (U-Mo) fuel element samples, and to perform analysis to support the Global Threat Reduction Initiative conversion program. PNNL’s support for the program will include the establishment of post-irradiation examination processes, including thermo-physical properties, unique to the U.S. Department of Energy laboratories. These processes will ultimately support the submission of the base fuel qualification (BFQ) to the U.S. Nuclear Regulatory Commission (NRC) and revisions to High Performance Research Reactor Safety Analysis Reports to enable conversion from highly enriched uranium to LEU fuel. This quality assurance plan (QAP) provides the quality assurance requirements and processes that support the NRC BFQ. This QAP is designed to be used by project staff, and prescribes the required management control elements that are to be met and how they are implemented. Additional controls are captured in Fuel Thermo-Physical Characterization Project plans, existing procedures, and procedures to be developed that provide supplemental information on how work is conducted on the project.

  9. Decision Support for Water Planning: the ZeroNet Water-Energy Initiative.

    SciTech Connect (OSTI)

    Rich, P. M. (Paul M.); Weintraub, Laura H. Z.; Ewers, Mary E.; Riggs, T. L. (Thomas L.); Wilson, C. J. (Cathy J.)

    2005-01-01

    Rapid population growth and severe drought are impacting water availability for all sectors (agriculture, energy, municipal, industry...), particularly in arid regions. New generation decision support tools, incorporating recent advances in informatics and geographic information systems (GIS), are essential for responsible water planning at the basin scale. The ZeroNet water-energy initiative is developing a decision support system (DSS) for the San Juan River Basin, with a focus on drought planning and economic analysis. The ZeroNet DSS provides a computing environment (cyberinfrastructure) with three major components: Watershed Tools, a Quick Scenario Tool, and a Knowledge Base. The Watershed Tools, based in the Watershed Analysis Risk Management Framework (WARMF), provides capabilities (1) to model surface flows, both the natural and controlled, as well as water withdrawals, via an engineering module, and (2) to analyze and visualize results via a stakeholder module. A new ZeroNet module for WARMF enables iterative modeling and production of 'what if' scenario libraries to examine consequences of changes in climate, landuse, and water allocation. The Quick Scenario Tool uses system dynamics modeling for rapid analysis and visualization for a variety of uses, including drought planning, economic analysis, evaluation of management alternatives, and risk assessment. The Knowledge Base serves simultaneously as the 'faithful scribe' to organize and archive data in easily accessible digital libraries, and as the 'universal translator' to share data from diverse sources and for diverse uses. All of the decision tools depend upon GIS capabilities for data/model integration, map-based analysis, and advanced visualization. The ZeroNet DSS offers stakeholders an effective means to address complex water problems.

  10. Transmission Grid Integration | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    utility operations, engage in transmission planning forums, and model generator output. More information on transmission grid integration is available in the Transmission...

  11. California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning

    E-Print Network [OSTI]

    Eto, Joseph; Stovall, John P.

    2003-01-01

    asset monitoring and analysis tools for reliability management B. Transmission power-asset monitoring and analysis tools for reliability management. B. Transmission power-asset monitoring and analysis tools for reliability management. B. Transmission power-

  12. Global Threat Reduction Initiative Africa and Middle East Project Plan 2012

    SciTech Connect (OSTI)

    Jamison, Jeremy D.

    2012-02-01

    GTRI Africa and Middle East Project Plan submitted for school project to American Graduate University.

  13. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect (OSTI)

    VAN BEEK, J.E.

    1999-09-02

    Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AP-108, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the Privatized waste processing plant and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump based retrieval system for any DST. This Project Management Plan (PMP) documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering.

  14. Special initiatives FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 5.0

    SciTech Connect (OSTI)

    Jekel, R.A.

    1994-09-01

    The Special Initiatives mission supports programmatic requests for service to DOE offices, other organizations and agencies. These requests can include the following: Supporting priority DOE initiatives; Researching special programs; Studying locating new activities at the Hanford Site; Producing specialty materials; Providing consulting support to other sites; Managing a broad spectrum of US and international test programs.

  15. Abstract--The transmission system plays an essential role in the new deregulated scenario. Aspects such as planning are

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    . · Energy prices determined by the congestion of the transmission system's lines are impacted. II1 Abstract-- The transmission system plays an essential role in the new deregulated scenario this methodology are the expanded transmission system and the agents involved in the expansion, together

  16. GLOBAL THREAT REDUCTION INITIATIVE REACTOR CONVERSION PROGRAM: STATUS AND CURRENT PLANS

    SciTech Connect (OSTI)

    Staples, Parrish A.; Leach, Wayne; Lacey, Jennifer M.

    2009-10-07

    The U.S. Department of Energy’s National Nuclear Security Administration (NNSA) Reactor Conversion Program supports the minimization, and to the extent possible, elimination of the use of high enriched uranium (HEU) in civilian nuclear applications by working to convert research and test reactors and radioisotope production processes to the use of low enriched uranium (LEU). The Reactor Conversion Program is a technical pillar of the NNSA Global Threat Reduction Initiative (GTRI) which is a key organization for implementing U.S. HEU minimization policy and works to reduce and protect vulnerable nuclear and radiological material domestically and abroad.

  17. Transmission Line MTF: Magnetized Target Fusion

    E-Print Network [OSTI]

    Transmission Line MTF: Magnetized Target Fusion Initial target: preheated & magnetized Subsequent for the FRC. Abstract Block Diagram theta coil transmission line Bias cap. bank maincapacitor inductor PI cap

  18. DRAFT WORKING PAPER JULY 2006 DO NOT QUOTE OR CITE Topological Elements of Transmission Pricing and Planning

    E-Print Network [OSTI]

    Blumsack, Seth

    -management or systems problem and not one of identifying specific beneficiaries. 1. The Transmission Puzzle The blackout the official blackout report issued by the joint U.S.-Canadian task force (Blackout Task Force 2003) avoided built in the U.S. using market-based compensation (Joskow 2005b). Largely in response to the blackout

  19. Designing electricity transmission auctions

    E-Print Network [OSTI]

    Greve, Thomas; Pollitt, Michael G.

    2012-10-26

    The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

  20. Planning electricity transmission to accommodate renewables: Using two-stage programming to evaluate flexibility and the cost of disregarding uncertainty

    E-Print Network [OSTI]

    van der Weijde, Adriaan Hendrik; Hobbs, Benjamin F.

    2011-01-31

     Niall Duncan (Univ. Edinburgh) for generating the hydro output data and to  lex Haffner  (National  Grid)  for  supplying  the  demand  data.  However,  any  errors  or  views  expressed  are  ntirely our own responsibility.  A e   2  A at...   system. The resulting model is then used to determine the optimally expansion plan under  uncertainty. We compare  these  results  to  those  that would occur under more  traditional  planning methods...

  1. Helicopter aids transmission pole replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Helicopter-aids-transmission-pole-replacement Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects...

  2. Richmond Electric Vehicle Initiative Electric Vehicle Readiness...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richmond Electric Vehicle Initiative Electric Vehicle Readiness Plan Richmond Electric Vehicle Initiative Electric Vehicle Readiness Plan The REVi plan addresses the electric...

  3. Moving Beyond Paralysis: How States and Regions Are Creating Innovative Transmission Projects; May 2009 - May 2010

    SciTech Connect (OSTI)

    Schumacher, A.; Fink, S.; Porter, K.

    2009-10-01

    This report profiles certain state and regional transmission policy initiatives aimed at promoting transmission development, mainly to access renewable resources.

  4. Plan

    National Nuclear Security Administration (NNSA)

    Information P.O. Box 62 Oak Ridge, TN 37831-0062 (423) 576-8401 DOENV-11432-244 Nevada Test Site Routine Radiological Environmental Monitoring Plan December 1998 Work Performed...

  5. Transmission Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report1538-1950 Timeline of Events:Smart

  6. System planning analysis applied to OTEC: initial cases by Florida Power Corporation. Task II report No. FC-5237-2

    SciTech Connect (OSTI)

    None

    1980-03-01

    The objective of the task was to exercise the FPC system planning methodology on: (1) Base Case, 10 year generation expansion plan with coal plants providing base load expansion, and (2) same, but 400 MW of OTEC substituting for coal burning units with equal resultant system reliability. OTEC inputs were based on reasonable economic projections of direct capital cost and O and M costs for first-generation large commercial plants. OTEC inputs discussed in Section 2. The Base Case conditions for FPC system planning methodology involved base load coal fueled additions during the 1980's and early 1990's. The first trial runs of the PROMOD system planning model substituted OTEC for 400 MW purchases of coal generated power during 1988-1989 and then 400 MW coal capacity thereafter. Result showed higher system reliability than Base Case runs. Reruns with greater coal fueled capacity displacement showed that OTEC could substitute for 400 MW purchases in 1988-1989 and replace the 800 MW coal unit scheduled for 1990 to yield equivalent system reliability. However, a 1995 unit would need to be moved to 1994. Production costing computer model runs were used as input to Corporate Model to examine corporate financial impact. Present value of total revenue requirements were primary indication of relative competitiveness between Base Case and OTEC. Results show present value of total revenue requirements unfavorable to OTEC as compared to coal units. The disparity was in excess of the allowable range for possible consideration.

  7. National transmission grid study

    SciTech Connect (OSTI)

    Abraham, Spencer

    2003-05-31

    The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE’s Policy Office Electricity Modeling System (POEMS). DOE’s analysis, presented in Section 2, confirms the central role of the nation’s transmission system in lowering costs to consumers through increased trade. More importantly, DOE’s analysis also confirms the results of previous studies, which show that transmission bottlenecks and related transmission system market practices are adding hundreds of millions of dollars to consumers’ electricity bills each year. A more detailed technical overview of the use of POEMS is provided in Appendix A. DOE led an extensive, open, public input process and heard a wide range of comments and recommendations that have all been considered.1 More than 150 participants registered for three public workshops held in Detroit, MI (September 24, 2001); Atlanta, GA (September 26, 2001); and Phoenix, AZ (September 28, 2001).

  8. Richard Shaheen named Senior VP of Transmission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transmission lines and initiated upgrades to Celilo Substation and the Pacific Direct Current Intertie. "Richard is an excellent leader, and his 25-plus years of experience at a...

  9. Transmission Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Services BPA Clarifications on the DSO216 1 Document updated on 2242015 at 3:29:25 PM B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Clarifications on...

  10. Transmission line capital costs

    SciTech Connect (OSTI)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  11. Initiating the Validation of CCIM Processability for Multi-phase all Ceramic (SYNROC) HLW Form: Plan for Test BFY14CCIM-C

    SciTech Connect (OSTI)

    Vince Maio

    2014-08-01

    This plan covers test BFY14CCIM-C which will be a first–of–its-kind demonstration for the complete non-radioactive surrogate production of multi-phase ceramic (SYNROC) High Level Waste Forms (HLW) using Cold Crucible Induction Melting (CCIM) Technology. The test will occur in the Idaho National Laboratory’s (INL) CCIM Pilot Plant and is tentatively scheduled for the week of September 15, 2014. The purpose of the test is to begin collecting qualitative data for validating the ceramic HLW form processability advantages using CCIM technology- as opposed to existing ceramic–lined Joule Heated Melters (JHM) currently producing BSG HLW forms. The major objectives of BFY14CCIM-C are to complete crystalline melt initiation with a new joule-heated resistive starter ring, sustain inductive melting at temperatures between 1600 to 1700°C for two different relatively high conductive materials representative of the SYNROC ceramic formation inclusive of a HLW surrogate, complete melter tapping and pouring of molten ceramic material in to a preheated 4 inch graphite canister and a similar canister at room temperature. Other goals include assessing the performance of a new crucible specially designed to accommodate the tapping and pouring of pure crystalline forms in contrast to less recalcitrant amorphous glass, assessing the overall operational effectiveness of melt initiation using a resistive starter ring with a dedicated power source, and observing the tapped molten flow and subsequent relatively quick crystallization behavior in pans with areas identical to standard HLW disposal canisters. Surrogate waste compositions with ceramic SYNROC forming additives and their measured properties for inductive melting, testing parameters, pre-test conditions and modifications, data collection requirements, and sampling/post-demonstration analysis requirements for the produced forms are provided and defined.

  12. Topic A Awardee: Eastern Interconnection Planning Collaborative...

    Energy Savers [EERE]

    policy makers Consumer and environmental interests Transmission Planning Authorities Market participants generating, transmitting or consuming electricity within the Eastern...

  13. Regional Transmission Projects: Finding Solutions

    SciTech Connect (OSTI)

    The Keystone Center

    2005-06-15

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

  14. Interstate Transmission Challenges for Renewable Energy: A Federalism...

    Open Energy Info (EERE)

    structures and cost allocation opportunities to better plan for and site the transmission build out necessary to meet renewable energy goals. Authors Alexandra Klass and Elizabeth...

  15. Proposed Southline Transmission Line Project - Volume 4 of 4...

    Office of Environmental Management (EM)

    2 Appendix J J-1 Southline Transmission Line Project Draft Environmental Impact Statement and Draft Resource Management Plan Amendment BLM LAND USE AUTHORIZATIONS 1...

  16. Reprinted from Advanced Planning Technology: Technological Achievements of the ARPA/Rome Laboratory Planning Ini-tiative (Austin Tate, editor), Menlo Park, California: AAAI Press, 1996, pp. 130-135.

    E-Print Network [OSTI]

    Reeves, Douglas S.

    Reprinted from Advanced Planning Technology: Technological Achievements of the ARPA/Rome Laboratory Planning Ini- tiative (Austin Tate, editor), Menlo Park, California: AAAI Press, 1996, pp. 130-135. Toward Rational Planning and Replanning Rational Reason Maintenance, Reasoning Economies, and Qualitative

  17. Phase 2 Report: Oahu Wind Integration and Transmission Study...

    Office of Environmental Management (EM)

    OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory) Initial Economic Analysis of Utility-scale Wind Integration in Hawaii...

  18. Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    SciTech Connect (OSTI)

    Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

    2011-02-01

    The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

  19. Introduction Synaptic transmission

    E-Print Network [OSTI]

    Stoltz, Brian M.

    Introduction ·Synaptic transmission throughout the nervous system is predominantly chemical ·At Channels #12;Neuroreceptors & Synaptic Transmission Synapse Neurotransmitter Receptor/Ion Channel Ion Flow

  20. Merchant transmission investment

    E-Print Network [OSTI]

    Joskow, Paul L.

    2003-01-01

    We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

  1. 1406 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 4, NOVEMBER 2007 Market-Based Coordination of Transmission

    E-Print Network [OSTI]

    Fu, Yong

    with competitive generation capacity planning in electricity markets. The purpose of the model is a holistic, competitive electricity markets, generation capacity planning, Lagrangian relaxation, merchant transmission simulation of generation and transmission capacity expansion in the market environment. The solution

  2. GLOBAL DYNAMICS OF AN SEIR EPIDEMIC MODEL WITH VERTICAL TRANSMISSION

    E-Print Network [OSTI]

    Li, Michael

    GLOBAL DYNAMICS OF AN SEIR EPIDEMIC MODEL WITH VERTICAL TRANSMISSION MICHAEL Y. LI, HAL L. SMITH population through both horizontal and vertical transmission. The total host population is assumed to have at an endemic equilibrium state if it initially exists. The contribution of the vertical transmission

  3. Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project

    SciTech Connect (OSTI)

    Woodford, D.

    2011-02-01

    This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands.

  4. Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project

    SciTech Connect (OSTI)

    Woodford, D.

    2011-02-01

    This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

  5. Department of Energy Announces Plans for Additional Comment Period...

    Office of Environmental Management (EM)

    Department of Energy Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors Department of Energy Announces Plans for Additional Comment...

  6. Concurrent Wind Cooling in Power Transmission Lines

    SciTech Connect (OSTI)

    Jake P Gentle

    2012-08-01

    Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

  7. Uncertain Power Flows and Transmission Planning

    E-Print Network [OSTI]

    ). PSERC is a multi-university Center conducting research on challenges facing a restructuring electric For information about this project contact: Gerald T. Heydt Arizona State University Department of Electrical University of Illinois at Urbana-Champaign Department of Electrical and Computer Engineering 1406 W. Green St

  8. Transmission Expansion Planning Using an AC Model ...

    E-Print Network [OSTI]

    Periodicals

    2013-01-02

    Two nonlinear programming (NLP) relaxation models are then proposed by ... H. D. Mittelmann is with the School of Mathematical and Statistical Sci- ences ...... Oct. 1970. [12] R. Fourer, D. M. Gay and B. W. Kernighan, AMPL: A Modeling Lan

  9. Environmental Recommendations for Transmission Planning | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, AlabamaETEC GmbH JumpEllenville,Power Corp Jump to: navigation, search Name:Restore

  10. Interconnection Transmission Planning: Awards | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLforLDRDEnergy Copyrights ASite ForResearch,The documentsCoP)List of

  11. Transmission Line Security Monitor: Final Report

    SciTech Connect (OSTI)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  12. Milestone Plan Process Improvement

    Office of Environmental Management (EM)

    community's concern over the milestone plan (MP) process within the system, the STRIPES Project Office initiated an in-depth evaluation of the required steps and issues...

  13. Transmission Commercial Project Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open Season (NOS) PTSA Reform North American Energy...

  14. American Samoa Initial Technical Assessment Report

    SciTech Connect (OSTI)

    Busche, S.; Conrad, M.; Funk, K.; Kandt, A.; McNutt, P.

    2011-09-01

    This document is an initial energy assessment for American Samoa, the first of many steps in developing a comprehensive energy strategy. On March 1, 2010, Assistant Secretary of the Interior Tony Babauta invited governors and their staff from the Interior Insular Areas to meet with senior principals at the National Renewable Energy Laboratory (NREL). Meeting discussions focused on ways to improve energy efficiency and increase the deployment of renewable energy technologies in the U.S. Pacific Territories. In attendance were Governors Felix Camacho (Guam), Benigno Fitial (Commonwealth of the Northern Mariana Islands), and Togiola Tulafono, (American Samoa). This meeting brought together major stakeholders to learn and understand the importance of developing a comprehensive strategic plan for implementing energy efficiency measures and renewable energy technologies. For several decades, dependence on fossil fuels and the burden of high oil prices have been a major concern but never more at the forefront as today. With unstable oil prices, the volatility of fuel supply and the economic instability in American Samoa, energy issues are a high priority. In short, energy security is critical to American Samoa's future economic development and sustainability. Under an interagency agreement, funded by the Department of Interior's Office of Insular Affairs, NREL was tasked to deliver technical assistance to the islands of American Samoa. Technical assistance included conducting an initial technical assessment to define energy consumption and production data, establish an energy consumption baseline, and assist with the development of a strategic plan. The assessment and strategic plan will be used to assist with the transition to a cleaner energy economy. NREL provided an interdisciplinary team to cover each relevant technical area for the initial energy assessments. Experts in the following disciplines traveled to American Samoa for on-island site assessments: (1) Energy Efficiency and Building Technologies; (2) Integrated Wind-Diesel Generation; (3) Transmission and Distribution; (4) Solar Technologies; and (5) Biomass and Waste-to-Energy. In addition to these core disciplines, team capabilities also included expertise in program analysis, project financing, energy policy and energy planning. The intent of the technical assessment was to provide American Samoa with a baseline energy assessment. From the baseline, various scenarios and approaches for deploying cost effective energy efficiency and renewable energy technologies could be created to meet American Samoa's objectives. The information provided in this energy assessment will be used as input in the development of a draft strategic plan and the development of scenarios and strategies for deploying cost-effective energy efficiency and renewable products.

  15. Transmission through the

    E-Print Network [OSTI]

    Yanikomeroglu, Halim

    Optimum Transmission through the GMAC D. Calabuig, R. Gohary, H. Yanikomero. 1/22 Introduction System model Optimization Algorithm Conclusions Optimum Transmission through the Gaussian Multiple Access Engineering Carleton University Ottawa, Canada July 8, 2013 #12;Optimum Transmission through the GMAC D

  16. Performance Incentives for Transmission

    E-Print Network [OSTI]

    Oren, Shmuel S.

    Performance Incentives for Transmission FERC's Standard Market Design should accommodate a performance-based regulation mechanism that is designed to align the interests of transmission operators to investment, transmission investors would be entitled to the CRRs or CRR auc- tion revenues engendered

  17. Transmission Enhancement Technology Report

    E-Print Network [OSTI]

    a recommendation of the most cost-effective methods and technologies to enhance electricity transmission from a review of methods and technologies with potential to enhance electricity transmission capability-traditional methods and technologies to increase the capacity of the high voltage electric power transmission system

  18. Vice President, Planning and Asset Management

    Broader source: Energy.gov [DOE]

    THIS VACANCY ANNOUNCEMENT HAS BEEN MODIFIED TO EXTEND THE CLOSING DATE TO 7/10/2015. Planning and Asset Management is responsible for overseeing Bonneville Power Administration's transmission...

  19. Automated manual transmission controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

    1999-12-28

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  20. Using Natural Gas Transmission Pipeline Costs to Estimate Hydrogen Pipeline Costs

    E-Print Network [OSTI]

    Parker, Nathan

    2004-01-01

    higher demand push US natural gas construction plans. ”Using Natural Gas Transmission Pipeline Costs to Estimatethe construction costs of natural gas, oil, and petroleum

  1. MPhil initiatives summary

    E-Print Network [OSTI]

    2009-07-13

    stream_source_info CMI MPhil Initiatives.doc.txt stream_content_type text/plain stream_size 3755 Content-Encoding UTF-8 stream_name CMI MPhil Initiatives.doc.txt Content-Type text/plain; charset=UTF-8 CMI Summary of MPhil... 2003) Sustainable development for large infrastructure projects (50% input from CU, 50% from MIT) Planning for sustainable development (MIT course tailored for CU) Sustainable energy (MIT course tailored for CU) Design for developing countries (MIT...

  2. Initiatives | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACT EVALUATION PLAN FOR0987P UncertaintyInitiatives Initiatives Through

  3. Series Transmission Line Transformer

    DOE Patents [OSTI]

    Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

    2004-06-29

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  4. 2010 -2013 Strategic Plan

    E-Print Network [OSTI]

    Sin, Peter

    2010 - 2013 Strategic Plan College of Liberal Arts and Sciences DISCOVER. TEACH. ENGAGE. #12;The strategy for these new and challenging times, I initiated a year-long strategic planning process. Paul D'Anieri, Dean Introduction College of Liberal Arts and Sciences Strategic Plan1 #12;College

  5. Supply-Side Planning in Texas--Past, Present and Future 

    E-Print Network [OSTI]

    Hughes, H. L. Jr.

    1986-01-01

    it was believed that the utilities were already doing these types of studies. The lack of information in the plans was an entirely unexpected result. In the interim between the initial fil ings and the latest filings, PUC staff and numerous utilities met... fil ing are transmission and distribution co-ops and this is the only option open to them. Typical T&D programs are: transformer evaluation studies, voltage reduction studies and load flow studies to optimize voltage levels for distribution...

  6. Transmission and Storage Operations

    Energy Savers [EERE]

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014...

  7. Collaborative Transmission Technology Roadmap

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Addendum to the Collaborative Transmission Technology Roadmap March 2014 Bonneville Power Administration Enhanced PDF Functionality Functionality of the PDF version of this...

  8. Patterns of transmission investment

    E-Print Network [OSTI]

    Joskow, Paul L.

    2005-01-01

    This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

  9. Operations Strategic Planning Committee | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Strategic Planning Committee The Operations Strategic Planning Committee has come up with an initial list of new opportunities and opportunities for improvement over the...

  10. New Developments in Transmission Electron Microscopy for Nanotechnology**

    E-Print Network [OSTI]

    Wang, Zhong L.

    New Developments in Transmission Electron Microscopy for Nanotechnology** By Zhong Lin Wang* 1. Electron Microscopy and Nanotechnology Nanotechnology, as an international initiative for science manufacturing are the foundation of nanotechnology. Tracking the historical background of why nanotechnology

  11. EC Transmission Line Risk Identification and Analysis

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-04-01

    The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

  12. Transmission Line Security Monitor

    ScienceCinema (OSTI)

    None

    2013-05-28

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  13. Transmission Line Security Monitor

    SciTech Connect (OSTI)

    2011-01-01

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  14. Transmission Design at the National Level: Benefits, Risks and Possible Paths Forward

    E-Print Network [OSTI]

    Electric Energy System #12;Transmission Design at the National Level: Benefits, Risks and Possible Paths Planning, Western Electricity Coordinating Council (WECC) · Dale Osborn, Consulting Advisor, Transmission to move electric energy interregionally is limited to the capacity of the existing transmission system

  15. Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues

    E-Print Network [OSTI]

    Budhraja, Vikram

    2008-01-01

    for transfer of renewable energy from the L.A.  Basin  Area April 2008.   Renewable Energy Transmission Initiative.  Commission  Competitive Renewable Energy Zones  California 

  16. Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    SciTech Connect (OSTI)

    Fink, S.; Rogers, J.; Porter, K.

    2010-07-01

    This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

  17. EIS-0411: Transmission Agency of Northern California Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

  18. Electricity Transmission, Pipelines, and National Trails. An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, Alaska, and Hawaii

    SciTech Connect (OSTI)

    Kuiper, James A; Krummel, John R; Hlava, Kevin J; Moore, H Robert; Orr, Andrew B; Schlueter, Scott O; Sullivan, Robert G; Zvolanek, Emily A

    2014-03-25

    As has been noted in many reports and publications, acquiring new or expanded rights-of-way for transmission is a challenging process, because numerous land use and land ownership constraints must be overcome to develop pathways suitable for energy transmission infrastructure. In the eastern U.S., more than twenty federally protected national trails (some of which are thousands of miles long, and cross many states) pose a potential obstacle to the development of new or expanded electricity transmission capacity. However, the scope of this potential problem is not well-documented, and there is no baseline information available that could allow all stakeholders to study routing scenarios that could mitigate impacts on national trails. This report, Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). Argonne was tasked by DOE to analyze the “footprint” of the current network of National Historic and Scenic Trails and the electricity transmission system in the 37 eastern contiguous states, Alaska, and Hawaii; assess the extent to which national trails are affected by electrical transmission; and investigate the extent to which national trails and other sensitive land use types may be affected in the near future by planned transmission lines. Pipelines are secondary to transmission lines for analysis, but are also within the analysis scope in connection with the overall directives of Section 368 of the Energy Policy Act of 2005, and because of the potential for electrical transmission lines being collocated with pipelines. Based on Platts electrical transmission line data, a total of 101 existing intersections with national trails on federal land were found, and 20 proposed intersections. Transmission lines and pipelines are proposed in Alaska; however there are no locations that intersect national trails. Source data did not indicate any planned transmission lines or pipelines in Hawaii. A map atlas provides more detailed mapping of the topics investigated in this study, and the accompanying GIS database provides the baseline information for further investigating locations of interest. In many cases the locations of proposed transmission lines are not accurately mapped (or a specific route may not yet be determined), and accordingly the specific crossing locations are speculative. However since both national trails and electrical transmission lines are long linear systems, the characteristics of the crossings reported in this study are expected to be similar to both observed characteristics of the existing infrastructure provided in this report, and of the new infrastructure if these proposed projects are built. More focused study of these siting challenges is expected to mitigate some of potential impacts by choosing routes that minimize or eliminate them. The current study primarily addresses a set of screening-level characterizations that provide insights into how the National Trail System may influence the siting of energy transport facilities in the states identified under Section 368(b) of the Energy Policy Act of 2005. As such, it initializes gathering and beginning analysis of the primary environmental and energy data, and maps the contextual relationships between an important national environmental asset and how this asset intersects with energy planning activities. Thus the current study sets the stage for more in-depth analyses and data development activities that begin to solve key transmission siting constraints. Our recommendations for future work incorporate two major areas: (1) database development and analytics and (2) modeling and scenario analysis for energy planning. These recommendations provide a path forward to address key issues originally developed under the Energy Policy Act of 2005 that are now being carried forward under the President’s Climate Action Plan.

  19. Energy Transmission and Infrastructure

    SciTech Connect (OSTI)

    Mathison, Jane

    2012-12-31

    The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

  20. SCB initiator

    DOE Patents [OSTI]

    Bickes Jr., Robert W.; Renlund, Anita M.; Stanton, Philip L.

    1994-11-01

    A detonator for high explosives initiated by mechanical impact includes a cylindrical barrel, a layer of flyer material mechanically covering the barrel at one end, and a semiconductor bridge ignitor including a pair of electrically conductive pads connected by a semiconductor bridge. The bridge is in operational contact with the layer, whereby ignition of said bridge forces a portion of the layer through the barrel to detonate the explosive. Input means are provided for igniting the semiconductor bridge ignitor.

  1. SCB initiator

    DOE Patents [OSTI]

    Bickes, Jr., Robert W. (Albuquerque, NM); Renlund, Anita M. (Albuquerque, NM); Stanton, Philip L. (Albuquerque, NM)

    1994-01-01

    A detonator for high explosives initiated by mechanical impact includes a cylindrical barrel, a layer of flyer material mechanically covering the barrel at one end, and a semiconductor bridge ignitor including a pair of electrically conductive pads connected by a semiconductor bridge. The bridge is in operational contact with the layer, whereby ignition of said bridge forces a portion of the layer through the barrel to detonate the explosive. Input means are provided for igniting the semiconductor bridge ignitor.

  2. Down hole transmission system

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

    2007-07-24

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

  3. Downhole transmission system

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

    2008-01-15

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

  4. Patterns of Transmission Investment

    E-Print Network [OSTI]

    Joskow, Paul

    2006-03-14

    influenced by uncertainty, contingency criteria and associated engineering reliability rules. I illustrate how the wholesale market and transmission investment frameworks have addressed these issues in England and Wales (E&W) since 1990 and in the PJM...

  5. Factsheet: An Initiative to Help Modernize Natural Gas Transmission...

    Office of Environmental Management (EM)

    Reductions (MONITOR) program. This program seeks to fund disruptive technologies for low-cost, highly sensitive systems for the detection and measurement of methane associated...

  6. Hawaii Clean Energy Initiative - Transmission Line Approval Permit Packet |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynnMassachusetts:Ohio: EnergyMinnesota:Havre deBioEnergy LLCOpen Energy

  7. Factsheet: An Initiative to Help Modernize Natural Gas Transmission and

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann JacksonDepartment ofOffice ofofWindUpcoming events intheSafety ProgramsNatural

  8. Transmission and Storage Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState ofSavingsTransmission SEAB PresentationTransmission and

  9. Integrated Transmission and Distribution Control

    SciTech Connect (OSTI)

    Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

    2013-01-16

    Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

  10. TRANSMISSION MEDIA 4.1 Guided Transmission Media

    E-Print Network [OSTI]

    Scarano, Vittorio

    CHAPTER 4 TRANSMISSION MEDIA 4.1 Guided Transmission Media Twisted Pair Coaxial Cable Optical Fiber 4.2 Wireless Transmission Antennas Terrestrial Microwave Satellite Microwave Broadcast Radio.4 Line-of-Sight Transmission Free Space Loss Atmospheric Absorption Multipath Refraction 4.5 Recommended

  11. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

    1991-08-27

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

  12. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

    1991-01-01

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

  13. Managing Critical Management Improvement Initiatives

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-10-01

    Provides requirements and responsibilities for planning, executing and assessing critical management improvement initiatives within DOE. DOE N 251.59, dated 9/27/2004, extends this Notice until 10/01/2005. Archived 11-8-10. Does not cancel other directives.

  14. IDC Integrated Master Plan.

    SciTech Connect (OSTI)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  15. Budget & Planning Strategic Plan

    E-Print Network [OSTI]

    Harms, Kyle E.

    Budget & Planning Strategic Plan Strategic Goal 1: Maintain a suitably staffed, effective the budget and planning needs of the institution. Strategic Goal 5: Identify ways in which B&P information and training opportunities to remain at the forefront of national trends Strategic Goal 2: Continue to meet

  16. Management Plan Management Plan

    E-Print Network [OSTI]

    Management Plan Management Plan "Management and restoration programs for native salmonids have communities" J. Lichatowich et al. 1998. A Conceptual Foundation for the Management of Native Salmonids in the Deschutes River. The Management Plan consists of five elements described in the Council's program: 1

  17. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1997-03-25

    A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

  18. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

    1997-01-01

    A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

  19. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1993-03-23

    A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  20. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

    1993-01-01

    A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  1. Operating plan FY 1998

    SciTech Connect (OSTI)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  2. Abstract--Under the need for anticipatory efficient investment in transmission, several problems arise at the regulation and

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    electricity market. Index Terms--Transmission planning, transmission investment, regulation, additional lines electric system. Without anticipatory investment, the net number of lines in the long term may1 Abstract--Under the need for anticipatory efficient investment in transmission, several problems

  3. > PAPER FOR THE SPECIAL SECTION ON TRANSMISSION INVESTMENT, PRICING AND CONSTRUCTION < 1 Abstract--From an economic perspective, the appropriate

    E-Print Network [OSTI]

    the impacts of an electricity transmission project on different players may vary, such side payments a multi-stage game-theoretic framework for electricity transmission investment as a new planning paradigm> PAPER FOR THE SPECIAL SECTION ON TRANSMISSION INVESTMENT, PRICING AND CONSTRUCTION

  4. Reinforcing Power Grid Transmission with FACTS Devices

    E-Print Network [OSTI]

    Frolov, Vladimir; Chertkov, Misha

    2013-01-01

    We explore optimization methods for planning the placement, sizing and operations of Flexible Alternating Current Transmission System (FACTS) devices installed into the grid to relieve congestion created by load growth or fluctuations of intermittent renewable generation. We limit our selection of FACTS devices to those that can be represented by modification of the inductance of the transmission lines. Our master optimization problem minimizes the $l_1$ norm of the FACTS-associated inductance correction subject to constraints enforcing that no line of the system exceeds its thermal limit. We develop off-line heuristics that reduce this non-convex optimization to a succession of Linear Programs (LP) where at each step the constraints are linearized analytically around the current operating point. The algorithm is accelerated further with a version of the cutting plane method greatly reducing the number of active constraints during the optimization, while checking feasibility of the non-active constraints post...

  5. Drill string transmission line

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

    2006-03-28

    A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

  6. Transmission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al., 2013)OpenEnergyTrail Canyon GeothermalTransmission (Redirected from

  7. Transmission Siting_071508.indd

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState ofSavingsTransmission SEAB Presentation

  8. Boardman to Hemingway Transmission Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open Season (NOS) PTSA Reform North American Energy...

  9. Transmission eigenvalues for elliptic operators

    E-Print Network [OSTI]

    Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

    2010-07-03

    A reduction of the transmission eigenvalue problem for multiplicative sign-definite perturbations of elliptic operators with constant coefficients to an eigenvalue problem for a non-selfadjoint compact operator is given. Sufficient conditions for the existence of transmission eigenvalues and completeness of generalized eigenstates for the transmission eigenvalue problem are derived. In the trace class case, the generic existence of transmission eigenvalues is established.

  10. Hopi Sustainable Energy Plan

    SciTech Connect (OSTI)

    Norman Honie, Jr.; Margie Schaff; Mark Hannifan

    2004-08-01

    The Hopi Tribal Government as part of an initiative to ?Regulate the delivery of energy and energy services to the Hopi Reservation and to create a strategic business plan for tribal provision of appropriate utility, both in a manner that improves the reliability and cost efficiency of such services,? established the Hopi Clean Air Partnership Project (HCAPP) to support the Tribe?s economic development goals, which is sensitive to the needs and ways of the Hopi people. The Department of Energy (DOE) funded, Formation of Hopi Sustainable Energy Program results are included in the Clean Air Partnership Report. One of the Hopi Tribe?s primary strategies to improving the reliability and cost efficiency of energy services on the Reservation and to creating alternative (to coal) economic development opportunities is to form and begin implementation of the Hopi Sustainable Energy Program. The Hopi Tribe through the implementation of this grant identified various economic opportunities available from renewable energy resources. However, in order to take advantage of those opportunities, capacity building of tribal staff is essential in order for the Tribe to develop and manage its renewable energy resources. As Arizona public utilities such as APS?s renewable energy portfolio increases the demand for renewable power will increase. The Hopi Tribe would be in a good position to provide a percentage of the power through wind energy. It is equally important that the Hopi Tribe begin a dialogue with APS and NTUA to purchase the 69Kv transmission on Hopi and begin looking into financing options to purchase the line.

  11. Federal Register Notice: Plan for Conduct of 2012 Electric Transmissio...

    Broader source: Energy.gov (indexed) [DOE]

    a Federal Register Notice initiating preparations for development of the 2012 National Electric Transmission Congestion Study. The Department is seeking comments on what...

  12. Transmission Line Circuit Alexander Glasser

    E-Print Network [OSTI]

    Anlage, Steven

    Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

  13. Asset Revitalization Initiative Guide for Sustainable Asset Management...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G 430.1-8, Asset Revitalization Initiative Guide for Sustainable Asset Management and Reuse by Website Administrator The Guide is intended to assist sites in sustainable planning,...

  14. Better Buildings Neighborhood Initiative Upgrades 100,000 Buildings...

    Broader source: Energy.gov (indexed) [DOE]

    Building on President Obama's Climate Action Plan and the Administration's Better Buildings Initiative, the Energy Department announced today that the Department's Better...

  15. New Mexico/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Western Area Power Administration, provide transmission in the state of New Mexico. Renewable Energy Transmission Authority The New Mexico Renewable Energy Transmission Authority...

  16. 2015 National Electric Transmission Congestion Study | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 National Electric Transmission Congestion Study 2015 National Electric Transmission Congestion Study 2015 National Electric Transmission Congestion Study Section 1221(a) of...

  17. Flexible Transmission in the Smart Grid

    E-Print Network [OSTI]

    Hedman, Kory Walter

    2010-01-01

    models of the electric transmission network flow problem.requirements in the electric transmission grid is provided.operations of the electric transmission grid. It also

  18. Cyclical-Transmission-Schedule Reservation Technique

    E-Print Network [OSTI]

    Garcia-Luna-Aceves, J.J.

    2010-01-01

    52) (58) (56) CYCLICAL-TRANSMISSION-SCHEDULE 6,118,787 A *for Topology Dependent Transmission Scheduling, in Proc.times an associ- ated transmission waiting time; and

  19. Flexible Transmission in the Smart Grid

    E-Print Network [OSTI]

    Hedman, Kory Walter

    2010-01-01

    differences: models for transmission property rights,” IEEEto solve power transmission network design problems,” IEEES. A. "Network topologies and transmission investment under

  20. Transmission Power Management for Wireless Health Applications

    E-Print Network [OSTI]

    Amini, Navid

    2012-01-01

    Experimental Analysis of RF Transmission Characteristics foroptimal low-energy transmission strategy for ieee 802.11a/h.Distributed algorithms for transmission power control in

  1. Device-to-Device Assisted Video Transmission

    E-Print Network [OSTI]

    Shen, Y; Zhou, W; Wu, P; Toni, L; Cosman, P C; Milstein, L B

    2013-01-01

    Equipment (UE) radio transmission and reception (3GPP TSand Mobile Ad Hoc Networks: Transmission-Capacity Tradeoff”,Device Assisted Video Transmission Yichao Shen, Wenwen Zhou,

  2. Electricity Transmission, A Primer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the...

  3. FUTURE POWER GRID INITIATIVE GridOPTICSTM

    E-Print Network [OSTI]

    FUTURE POWER GRID INITIATIVE GridOPTICSTM : A Software Framework for Power System Operations technologies needed to support the operations and planning of the future power grid » provide a framework to the GridPACK numerical library that is being developed in the Future Power Grid Initiative APPROACH

  4. Automated manual transmission clutch controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

    1999-11-30

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  5. 2014 Annual Planning Summary for the NNSA Global Threat Reduction...

    Energy Savers [EERE]

    Global Threat Reduction Initiative Office 2014 Annual Planning Summary for the NNSA Global Threat Reduction Initiative Office The ongoing and projected Environmental Assessments...

  6. Heat transmission in Relativity

    E-Print Network [OSTI]

    A. Brotas; J. C. Fernandes

    2003-07-16

    The simultaneous study of deformation and heat transmission in a bar was ignored for about 150 years. The traditional Fourier equation just allows to study the evolution of temperature in a undeformable bar. The search for its relativistic variant is a task which must fail because in Relativity there are no undeformable bars. Rigid bodies, in the sense as rigid as possible, are deformables. In this work we show how to write in Relativity the system of equations necessary to study simultaneously deformation and temperature evolution along a rigid bar.

  7. Transmission SEAB Presentation

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE- Non-ResidentialAlliantPGEDepartmentfan system' % ~ TransmissionAvailable

  8. DOE Transmission Workshop

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i pStateDOE FederalTheofHeyeck, AEP, Sr. Vice President, Transmission

  9. Transmission Business Line

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking With U.S.Week DayDr.Theories81TowardsTrackingCarbon2Transmission

  10. Central Wind Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities: Revised Edition

    SciTech Connect (OSTI)

    Rogers, J.; Porter, K.

    2011-03-01

    The report and accompanying table addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America. The first part of the table focuses on electric utilities and regional transmission organizations that have central wind power forecasting in place; the second part focuses on electric utilities and regional transmission organizations that plan to adopt central wind power forecasting in 2010. This is an update of the December 2009 report, NREL/SR-550-46763.

  11. Light Transmission through Sub-Wavelength Apertures

    E-Print Network [OSTI]

    Visser, Taco D.

    Light Transmission through Sub-Wavelength Apertures #12;#12;VRIJE UNIVERSITEIT Light Transmission Transmission through a Single Sub-wavelength Slit 59 3.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60 3.2 The configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61 3.3 Transmission

  12. EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona

    Broader source: Energy.gov [DOE]

    Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

  13. 2012 National Electric Transmission Congestion Study: Presentation...

    Energy Savers [EERE]

    2012 National Electric Transmission Congestion Study: Presentation from Congestion Study Webinar Series 2012 National Electric Transmission Congestion Study: Presentation from...

  14. 2009 National Electric Transmission Congestion Study Workshops...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Congestion Studies 2009 Congestion Study 2009 National Electric Transmission Congestion Study Workshops 2009 National Electric Transmission Congestion Study Workshops DOE...

  15. Transmission Eigenvalues in Inverse Scattering Theory

    E-Print Network [OSTI]

    2012-04-22

    TE and Scattering Theory. Spherically Stratified Media. Transmission Eigenvalues. Open Problem. Transmission Eigenvalues in Inverse. Scattering Theory.

  16. Transmission Reliability Program 2015 Reliability & Markets Peer...

    Office of Environmental Management (EM)

    Transmission Reliability Program 2015 Reliability & Markets Peer Review Materials Available Transmission Reliability Program 2015 Reliability & Markets Peer Review Materials...

  17. Manual transmission shift linkage

    SciTech Connect (OSTI)

    Sewell, J.S.

    1991-10-01

    This patent describes a sliding gear manual transmission (10) for an automotive vehicle including a transmission housing (11), an input shaft (12) journalled in the housing, an output shaft (13) axially aligned with the input shaft and journalled in the housing, a countershaft (15) journalled in the housing and carrying a cluster gear (17) thereon, the input shaft (12) terminating in an input gear (14), a plurality of gears (26,27,28,29,31,31) on the output shaft (13) in meshing engagement with the cluster gear (17), and a plurality of synchronizing clutches (36,38,41,42) on the output shaft and countershaft for engagement of gear ratios of the meshing gears, and an axially movable and rotatable shift rail (81) located in the housing and operatively connected to a shift lever (82) actuated by the vehicle operator, the improvement comprising an auxiliary shift rail (98) located in the housing (11) generally paralleling the first mentioned shift rail (81) to provide for actuation of fifth, sixth and reverse gears the auxiliary shift rail (98) having a 5-6 shift arm (104) journalled thereon for axial movement relative thereto, and a reverse shift arm (99) rotatably mounted thereon for axial movement therewith.

  18. Colorado Electrical Transmission Grid

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2012-02-01

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Xcel Energy Publication Date: 2012 Title: Colorado XcelEnergy NonXcel Transmission Network Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains transmission network of Colorado Spatial Domain: Extent: Top: 4540689.017558 m Left: 160606.141934 m Right: 758715.946645 m Bottom: 4098910.893397m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shapefile

  19. Speakers’ Perspectives in Utterance Planning revisited. 

    E-Print Network [OSTI]

    MacDonald, Rhiannon

    2007-01-01

    How do speakers plan utterances? Horton and Keysar (1996) suggested that speakers initially plan utterances without regard for their intended addressee. However there are a number of concerns over the methods, which they ...

  20. National Nanotechnology Initiative's Signature Initiative Sustainable...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    will include manufactured products based on: * Carbon-based nanomaterials * Optical metamaterials * Cellulosic nanomaterials National Nanotechnology Initiative Three requirements...

  1. Case study on the US superconducting power transmission program

    SciTech Connect (OSTI)

    Hammel, E.F.

    1996-02-01

    After the 1911 discovery of superconductivity (the abrupt loss of electrical resistance in certain materials at very low temperatures), attempts were made to make practical use of this phenomenon. Initially these attempts failed, but in the early 1960s (after 50 years of research) they succeeded. By then, the projected growth in the production and consumption of electrical energy required much higher capacity power transmission capabilities than were available or likely to become available from incremental improvements in existing transmission technology. Since superconductors were capable in principle of transmitting huge amounts of power, research programs to develop and demonstrate superconducting transmission lines were initiated in the US and abroad. The history of the US program, including the participants, their objectives, funding and progress made, is outlined. Since the R&D program was terminated before the technology was completely demonstrated, the reasons for and consequences of this action are discussed in a final section.

  2. Dynamic Transmission Electron Microscopy

    SciTech Connect (OSTI)

    Evans, James E.; Jungjohann, K. L.; Browning, Nigel D.

    2012-10-12

    Dynamic transmission electron microscopy (DTEM) combines the benefits of high spatial resolution electron microscopy with the high temporal resolution of ultrafast lasers. The incorporation of these two components into a single instrument provides a perfect platform for in situ observations of material processes. However, previous DTEM applications have focused on observing structural changes occurring in samples exposed to high vacuum. Therefore, in order to expand the pump-probe experimental regime to more natural environmental conditions, in situ gas and liquid chambers must be coupled with Dynamic TEM. This chapter describes the current and future applications of in situ liquid DTEM to permit time-resolved atomic scale observations in an aqueous environment, Although this chapter focuses mostly on in situ liquid imaging, the same research potential exists for in situ gas experiments and the successful integration of these techniques promises new insights for understanding nanoparticle, catalyst and biological protein dynamics with unprecedented spatiotemporal resolution.

  3. AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION

    Office of Energy Efficiency and Renewable Energy (EERE)

    The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

  4. Vice President, Transmission System Operations

    Broader source: Energy.gov [DOE]

    The VP for Transmission System Operations provides strategic leadership, direction, and oversight of the people, business processes, and systems that are responsible for the safe, reliable, and...

  5. Transmission Workshop | Department of Energy

    Energy Savers [EERE]

    which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions...

  6. Great Plains Wind Energy Transmission Development Project

    SciTech Connect (OSTI)

    Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

    2012-06-09

    In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

  7. The interior transmission problem and bounds on transmission eigenvalues

    E-Print Network [OSTI]

    Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

    2010-09-28

    We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

  8. Office of Campus Sustainability Business Plan

    E-Print Network [OSTI]

    Eustice, Ryan

    ...........................................................9 Appendix B Annual Report on 6-Point Environmental & Energy Initiative Plan................ 16....................................................................................................... 17 Point 2--Renewable Energy.......................................................................................... 28 Point 5--New Construction/Renovation Projects

  9. Task Plans

    Office of Environmental Management (EM)

    Task Plans This page contains links to a tentative listing of active and closed TEC Task Plans. Final status of these task plans will be determined after the July 2000 TEC meeting....

  10. Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions

    Broader source: Energy.gov [DOE]

    Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed that gap in recent...

  11. HVDC power transmission technology assessment

    SciTech Connect (OSTI)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D.; Johnson, B.K.; Stewart, J.R.; Fink, J.L.

    1997-04-01

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  12. 2010 Climate Action Plan Environmental

    E-Print Network [OSTI]

    Capecchi, Mario R.

    2010 Climate Action Plan Energy and Environmental Stewardship Initiative: Prepared by: The Office.........................................................................................................................17 4A. Curriculum, Education, and Research environmental stewardship and reduces our own carbon footprint on campus. Through the U's Office

  13. EC Transmission Line Materials

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-05-01

    The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

  14. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric...

    Broader source: Energy.gov (indexed) [DOE]

    demonstration, technology transfer, and policy development activities for the electric transmission and distribution system. OE has prepared this program plan pursuant...

  15. Sustainable Forest Bioenergy Initiative

    SciTech Connect (OSTI)

    Breger, Dwayne; Rizzo, Rob

    2011-09-20

    In the state’s Electricity Restructuring Act of 1998, the Commonwealth of Massachusetts recognized the opportunity and strategic benefits to diversifying its electric generation capacity with renewable energy. Through this legislation, the Commonwealth established one of the nation’s first Renewable Energy Portfolio Standard (RPS) programs, mandating the increasing use of renewable resources in its energy mix. Bioenergy, meeting low emissions and advanced technology standards, was recognized as an eligible renewable energy technology. Stimulated by the state’s RPS program, several project development groups have been looking seriously at building large woody biomass generation units in western Massachusetts to utilize the woody biomass resource. As a direct result of this development, numerous stakeholders have raised concerns and have prompted the state to take a leadership position in pursuing a science based analysis of biomass impacts on forest and carbon emissions, and proceed through a rulemaking process to establish prudent policy to support biomass development which can contribute to the state’s carbon reduction commitments and maintain safeguards for forest sustainability. The Massachusetts Sustainable Forest Bioenergy Initiative (SFBI) was funded by the Department of Energy and started by the Department of Energy Resources before these contentious biomass issues were fully raised in the state, and continued throughout the substantive periods of this policy development. Thereby, while SFBI maintained its focus on the initially proposed Scope of Work, some aspects of this scope were expanded or realigned to meet the needs for groundbreaking research and policy development being advanced by DOER. SFBI provided DOER and the Commonwealth with a foundation of state specific information on biomass technology and the biomass industry and markets, the most comprehensive biomass fuel supply assessment for the region, the economic development impact associated with biomass usage, an understanding of forest management trends including harvesting and fuel processing methods, and the carbon profile of utilizing forest based woody biomass for the emerging biomass markets. Each of the tasks and subtasks have provided an increased level of understanding to support new directives, policies and adaptation of existing regulations within Massachusetts. The project has provided the essential information to allow state policymakers and regulators to address emerging markets, while ensuring forest sustainability and understanding the complex science on CO2 accounting and impacts as a result of biomass harvesting for power generation. The public at large and electricity ratepayers in Massachusetts will all benefit from the information garnered through this project. This is a result of the state’s interest to provide financial incentives to only biomass projects that demonstrate an acceptable carbon profile, an efficient use of the constrained supply of fuel, and the harvest of biomass to ensure forest sustainability. The goals of the Massachusetts Sustainable Forest Bioenergy Initiative as proposed in 2006 were identified as: increase the diversity of the Massachusetts energy mix through biomass; promote economic development in the rural economy through forest industry job creation; help fulfill the state’s energy and climate commitments under the Renewable Energy Portfolio Standard and Climate Protection Plan; assist the development of a biomass fuel supply infrastructure to support energy project demands; provide education and outreach to the public on the benefits and impacts of bioenergy; improve the theory and practice of sustainable forestry in the Commonwealth. Completed project activities summarized below will demonstrate the effectiveness of the project in meeting the above goals. In addition, as discussed above, Massachusetts DOER needed to make some modifications to its work plan and objectives during the term of this project due to changing public policy demands brought forth in the course of the public discours

  16. Y-12 Site Sustainability Plan

    SciTech Connect (OSTI)

    none,; Erhart, S C; Spencer, C G

    2013-12-01

    This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

  17. RAPID/BulkTransmission/Transmission Siting & Interconnection | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsourceBulkTransmission/Environment/Nevada < RAPID‎RAPID/BulkTransmission/Site Considerations <

  18. Two-particle quantum transmission

    E-Print Network [OSTI]

    Ron Folman

    2012-11-25

    Two-photon interference is a fundamental phenomenon in quantum mechanics and stands at the base of numerous experimental observations. Here another manifestation of this phenomenon is described, taking place at a Y junction. Specifically it is shown how the r^2+t^2 term which is behind previous observations of two-photon interference, may give rise to different states at a beam-splitter and different two-particle transmission coefficients at a Y junction. Different from previous descriptions of quantum transmission based on one-particle physics, the enhanced transmission described here is due to two-particle physics.

  19. Electrical transmission line diametrical retainer

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

    2004-12-14

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

  20. Transmission probabilities and the Miller-Good transformation

    E-Print Network [OSTI]

    Petarpa Boonserm; Matt Visser

    2009-01-08

    Transmission through a potential barrier, and the related issue of particle production from a parametric resonance, are topics of considerable general interest in quantum physics. The authors have developed a rather general bound on quantum transmission probabilities, and recently applied it to bounding the greybody factors of a Schwarzschild black hole. In the current article we take a different tack -- we use the Miller-Good transformation (which maps an initial Schrodinger equation to a final Schrodinger equation for a different potential) to significantly generalize the previous bound.

  1. Transmission probabilities and the Miller-Good transformation

    E-Print Network [OSTI]

    Boonserm, Petarpa

    2008-01-01

    Transmission through a potential barrier, and the related issue of particle production from a parametric resonance, are topics of considerable general interest in quantum physics. The authors have developed a rather general bound on quantum transmission probabilities, and recently applied it to bounding the greybody factors of a Schwarzschild black hole. In the current article we take a different tack -- we use the Miller-Good transformation (which maps an initial Schrodinger equation to a final Schrodinger equation for a different potential) to significantly generalize the previous bound.

  2. Guidelines for strategic planning

    SciTech Connect (OSTI)

    Not Available

    1991-07-01

    Strategic planning needs to be done as one of the integral steps in fulfilling our overall Departmental mission. The role of strategic planning is to assure that the longer term destinations, goals, and objectives which the programs and activities of the Department are striving towards are the best we can envision today so that our courses can then be set to move in those directions. Strategic planning will assist the Secretary, Deputy Secretary, and Under Secretary in setting the long-term directions and policies for the Department and in making final decisions on near-term priorities and resource allocations. It will assist program developers and implementors by providing the necessary guidance for multi-year program plans and budgets. It is one of the essential steps in the secretary's Strategic Planning Initiative. The operational planning most of us are so familiar with deals with how to get things done and with the resources needed (people, money, facilities, time) to carry out tasks. Operating plans like budgets, capital line item projects, R D budgets, project proposals, etc., are vital to the mission of the Department. They deal, however, with how to carry out programs to achieve some objective or budget assumption. Strategic planning deals with the prior question of what it is that should be attempted. It deals with what objectives the many programs and activities of the Department of Department should be striving toward. The purpose of this document is to provide guidance to those organizations and personnel starting the process for the first time as well as those who have prepared strategic plans in the past and now wish to review and update them. This guideline should not be constructed as a rigid, restrictive or confining rulebook. Each organization is encouraged to develop such enhancements as they think may be useful in their planning. The steps outlined in this document represent a very simplified approach to strategic planning. 9 refs.

  3. Transmission eigenvalue distributions in highly conductive molecular junctions

    E-Print Network [OSTI]

    Bergfield, Justin P; Barr, Joshua D; Stafford, Charles A

    2012-01-01

    Transmission eigenvalue distributions in highly conductivesingle-molecule junction; transmission eigenchannels Openuniquely characterized by its transmission eigenvalues ? n .

  4. Incorporating Energy Efficiency into Western Interconnection Transmission Planning

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01

    Association. 2010. Improving Energy Efficiency for Alberta’sStudy. Nexant. 2010. NorthWestern Energy Assessmentof Energy Efficiency Potentials (2010-2029). Quantec. 2007.

  5. Incorporating Energy Efficiency into Western Interconnection Transmission Planning

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01

    2010. Improving Energy Efficiency for Alberta’s IndustrialEnergy Assessment of Energy Efficiency Potentials (2010-2010. Improving Energy Efficiency for Alberta’s Industrial

  6. Incorporating Energy Efficiency into Western Interconnection Transmission Planning

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01

    types of DSM resources: energy efficiency, demand response (with New Mexico’s energy efficiency resource standard. Theand Texas' energy efficiency resource standards. From 2022

  7. Microsoft Word - Impact_DSR_on_Transmission_Planning_Final.docx

    Energy Savers [EERE]

    CO2R RPSN BAU EEDR CO2N CO2R RPSN BAU EEDR CO2N CO2R RPSN Southwest Southeast Midwest Central Northeast Genertion (TWh) Low Demand Base Demand High Demand 15 In the...

  8. Incorporating Demand Response into Western Interconnection Transmission Planning

    E-Print Network [OSTI]

    Satchwell, Andrew

    2014-01-01

    Aggregator Programs. Demand Response Measurement andIncorporating Demand Response into Western Interconnection13 Demand Response Dispatch

  9. Incorporating Energy Efficiency into Western Interconnection Transmission Planning

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01

    Incorporating Demand Response into Western Interconnectiongeneration DR – demand response DSM – demand-side managementenergy efficiency, demand response (DR), and distributed

  10. Interstate Strategies for Transmission Planning and Expansion | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas: Energy ResourcesOrder at 8, 13Renewable Power

  11. Federal Register Notice: Plan for Conduct of 2012 Electric Transmission

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLforLDRD Report to Congress MoreHydlogo_femp.pngAddthis853Energy

  12. Plan to Conduct Electric Transmission Congestion Study: Federal Register

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidential PermitDAYS - WE NEED ADr. PeterPV),

  13. BPA selects new VP of Transmission Planning and Asset Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory of raregovAboutRecovery ActTools to someoneAstrophysicsAwardsBESResearch

  14. DOE Action Plan Addressing the Electricity Transmission System

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p aDepartmentEnergyEveryCustomerD=DISCLAIMER:1904-AC23,T A *Chapter

  15. Transmission Planning: Institutional Issues in the West | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState ofSavings forTitleJulyAmyDepartmentEnergy'

  16. Impacts of Demand-Side Resources on Electric Transmission Planning |

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservation Standards andEnergy Illinois StateEnergyDepartment

  17. Recovery Act Interconnection Transmission Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow Your

  18. Transmission Services Product Pricing Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and 09:00 PPT on the above effective date. On October 15, 2013, at 08:00 (PPT), Transmission Services will be updating the OASIS default product prices to reflect the 2014...

  19. Transmission Services Product Pricing Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and 12:00 PPT on the above effective date. On October 1, 2015, at 11:00 (PPT), Transmission Services will be updating the OASIS default product prices to reflect the 2016...

  20. TRANSMISSION AND GENERATION INVESTMENT IN ...

    E-Print Network [OSTI]

    2015-03-04

    Mar 4, 2015 ... generation capacity by private firms in liberalized electricity markets. ... Electricity Markets, Network Expansion, Transmission Management. 1 ...... renewables: Using two-stage optimisation to evaluate flexibility and the cost of.

  1. Immunology of naturally transmissible tumours

    E-Print Network [OSTI]

    Siddle, Hannah V.; Kaufman, Jim

    2014-09-04

    understanding of the vertebrate immune response to allografts. Two naturally occurring contagious cancers are currently active in the animal kingdom, Canine Transmissible Venereal Tumour (CTVT) that spreads among dogs and Devil Facial Tumour Disease (DFTD) among...

  2. MONTANA PALLADIUM RESEARCH INITIATIVE

    SciTech Connect (OSTI)

    Peters, John McCloskey, Jay Douglas, Trevor Young, Mark Snyder, Stuart Gurney, Brian

    2012-05-09

    Project Objective: The overarching objective of the Montana Palladium Research Initiative is to perform scientific research on the properties and uses of palladium in the context of the U.S. Department of Energy'Ă?Â?Ă?Â?Ă?Â?Ă?Â?Ă?Â?Ă?Â?Ă?Â?Ă?Â?s Hydrogen, Fuel Cells and Infrastructure Technologies Program. The purpose of the research will be to explore possible palladium as an alternative to platinum in hydrogen-economy applications. To achieve this objective, the Initiatives activities will focus on several cutting-edge research approaches across a range of disciplines, including metallurgy, biomimetics, instrumentation development, and systems analysis. Background: Platinum-group elements (PGEs) play significant roles in processing hydrogen, an element that shows high potential to address this need in the U.S. and the world for inexpensive, reliable, clean energy. Platinum, however, is a very expensive component of current and planned systems, so less-expensive alternatives that have similar physical properties are being sought. To this end, several tasks have been defined under the rubric of the Montana Palladium Research Iniative. This broad swath of activities will allow progress on several fronts. The membrane-related activities of Task 1 employs state-of-the-art and leading-edge technologies to develop new, ceramic-substrate metallic membranes for the production of high-purity hydrogen, and develop techniques for the production of thin, defect-free platinum group element catalytic membranes for energy production and pollution control. The biomimetic work in Task 2 explores the use of substrate-attached hydrogen-producing enzymes and the encapsulation of palladium in virion-based protein coats to determine their utility for distributed hydrogen production. Task 3 work involves developing laser-induced breakdown spectroscopy (LIBS) as a real-time, in situ diagnostic technique to characterize PGEs nanoparticles for process monitoring and control. The systems engineering work in task 4 will determine how fuel cells Ă?Â?Ă?Â?Ă?Â?Ă?Â?Ă?Â?Ă?Â?Ă?Â?Ă?Â?taken as systems behave over periods of time that should show how their reformers and other subsystems deteriorate with time.

  3. 2009 National Electric Transmission Congestion Study | Department...

    Energy Savers [EERE]

    Congestion Studies 2009 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended...

  4. 2006 National Electric Transmission Congestion Study Federal...

    Office of Environmental Management (EM)

    6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

  5. 2006 National Electric Transmission Congestion Study | Department...

    Office of Environmental Management (EM)

    6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

  6. Exploring the Business Link Opportunity: Transmission & Clean...

    Office of Environmental Management (EM)

    Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the...

  7. Transmission Reassignment Reporting Requirement - April 2, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Transmission Reassignment Reporting Requirement This notice serves as a reminder to transmission...

  8. Transmission/Nepa Database | Open Energy Information

    Open Energy Info (EERE)

    Nepa Database < Transmission Jump to: navigation, search NepaHeader.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New...

  9. Transmission Eigenvalues in Inverse Scattering Theory

    E-Print Network [OSTI]

    Title: Transmission Eigenvalues in Inverse Scattering Theory Abstract: The transmission eigenvalue problem is a new class of eigenvalue problems that has

  10. WEYL ASYMPTOTICS OF THE TRANSMISSION EIGENVALUES ...

    E-Print Network [OSTI]

    2014-09-02

    plex internal transmission eigenvalues when the domain is a ball and the index ... formulas for the counting function of the real Interior Transmission Eigenvalues.

  11. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01

    Solar Capacity Factor Capacity Energy TC = c c ( P w + P c +cost weighted by energy or capacity has far less importancerelative share of capacity and energy from the modeled wind

  12. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Wind Energy Project. New England Electricity Scenario Analysis: Exploring the economic, reliability, and environmental impacts

  13. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    to Support the Development of Wind Powered Generation inExtraeuropean Options for an Energy Supply with Wind Power,”Conference on Wind Power for the 21 st Century, Kassel,

  14. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    pdf/0554(2008).pdf European Wind Energy Association (EWEA).Large Scale Integration of Wind Energy in the European PowerPrepared by the European Wind Energy Association. http://

  15. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    line cost and substation costs. The resulting broad range inthe cost of all associated equipment such as substations,

  16. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Assumptions to the Annual Energy Outlook 2008. Washington,to produce the EIA’s Annual Energy Outlook. As shown in theby the EIA in its Annual Energy Outlook (AEO), as well as to

  17. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  18. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  19. Institutional plan. Fiscal year, 1997--2002

    SciTech Connect (OSTI)

    NONE

    1996-10-01

    The Institutional Plan is the culmination of Argonne`s annual planning cycle. The document outlines what Argonne National Laboratory (ANL) regards as the optimal development of programs and resources in the context of national research and development needs, the missions of the Department of Energy and Argonne National Laboratory, and pertinent resource constraints. It is the product of ANL`s internal planning process and extensive discussions with DOE managers. Strategic planning is important for all of Argonne`s programs, and coordination of planning for the entire institution is crucial. This Institutional Plan will increasingly reflect the planning initiatives that have recently been implemented.

  20. Specialty Fibers for Terahertz Generation and Transmission: A Review

    E-Print Network [OSTI]

    Barh, Ajanta; Agrawal, G P; Varshney, R K; Rahman, B M A

    2015-01-01

    Terahertz (THz) frequency range, lying between the optical and microwave range covers a significant portion of the electro-magnetic spectrum. Though its initial usage started in the 1960s, active research in the THz field started only in the 1990s by researchers from both optics and microwaves disciplines. The use of optical fibers for THz application has attracted considerable attention in recent years. In this article, we review the progress and current status of optical fiber-based techniques for THz generation and transmission. The first part of this review focuses on THz sources. After a review on various types of THz sources, we discuss how specialty optical fibers can be used for THz generation. The second part of this review focuses on the guided wave propagation of THz waves for their transmission. After discussing various wave guiding schemes, we consider new fiber designs for THz transmission.

  1. Grid Expansion Planning for Carbon Emissions Reduction

    SciTech Connect (OSTI)

    Bent, Russell W. [Los Alamos National Laboratory; Toole, Gasper L. [Los Alamos National Laboratory

    2012-07-18

    There is a need to upgrade and expand electric power transmission and generation to meet specified renewable energy targets and simultaneously minimize construction cost and carbon emissions. Some challenges are: (1) Renewable energy sources have variable production capacity; (2) Deficiency of transmission capacity at desirable renewable generation locations; (3) Need to incorporate models of operations into planning studies; and (4) Prevent undesirable operational outcomes such as negative dispatch prices or curtailment of carbon neutral generation.

  2. WELLCOME TRUST STRATEGIC PLAN 2005-2010

    E-Print Network [OSTI]

    Rambaut, Andrew

    WELLCOME TRUST STRATEGIC PLAN 2005-2010 SUMMARY OF PROGRESS AND ACHIEVEMENTS FEBRUARY 2010 #12;STRATEGIC PLAN 2005-2010 ­ PROGRESS AND ACHIEVEMENTS This document provides an overview of the Wellcome-year Strategic Plan 2005-2010. It highlights the major activities and funding initiatives we developed

  3. an educational alternative futures wildland planning game

    E-Print Network [OSTI]

    an educational alternative futures wildland planning game Edward C. Thor James L. Creighton PACIFIC. ACKNOWLEDGMENT The Mystic Mountain Game was initially developed for a workshop on alternative futures planning alternative futures wildland planning game. Gen. Tech. Rep. PSW-30, 8 p., illus. Pacific South- west Forest

  4. Energy Transition Initiative: Islands Playbook (Book)

    SciTech Connect (OSTI)

    Not Available

    2015-01-01

    The Island Energy Playbook (the Playbook) provides an action-oriented guide to successfully initiating, planning, and completing a transition to an energy system that primarily relies on local resources to eliminate a dependence on one or two imported fuels. It is intended to serve as a readily available framework that any community can adapt to organize its own energy transition effort.

  5. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  6. APEC Smart Grid Initiative

    SciTech Connect (OSTI)

    Bloyd, Cary N.

    2012-03-01

    This brief paper describes the activities of the Asia Pacific Economic Cooperation (APEC) Smart Grid Initiative (ASGI) which is being led by the U.S. and developed by the APEC Energy Working Group. In the paper, I describe the origin of the initiative and briefly mention the four major elements of the initiative along with existing APEC projects which support it.

  7. GLOBAL TAXONOMY INITIATIVE

    E-Print Network [OSTI]

    Grant, Taran

    #12;THE GLOBAL TAXONOMY INITIATIVE: Using Systematic Inventories to Meet Country and Regional Needs (COP) to the Convention on Biological Diversity (CBD) has endorsed a GlobalTaxonomy Initiative (GTI workshop, The Global Taxonomy Initiative: Shortening the Distance between Discovery and Delivery, made

  8. Proactive Planning 

    E-Print Network [OSTI]

    Wythe, Kathy

    2008-01-01

    an opportunity to voice their opinions and help draft the watershed protection plan for the reservoir. The plan, which will outline ways to reduce pollution and improve water quality, is an outgrowth of years of water quality monitoring and research by TRWD... in stakeholder-based watershed protection planning focused on holistic solutions to water pollution by exam- ining the impacts of upstream activities. Watershed-based planning is a relatively new approach to pollution reduction in all sizes of water bodies...

  9. TRANSMISSION EIGENVALUES LASSI PAIVARINTA AND JOHN SYLVESTER

    E-Print Network [OSTI]

    Sylvester, John

    TRANSMISSION EIGENVALUES LASSI P¨AIV¨ARINTA AND JOHN SYLVESTER Abstract. The scattering of a time. A transmission eigenvalue is a wavenumber at which the scattering operator has a non-trivial kernel or cokernel that are not transmission eigenvalues, they have been studied for some time. Nevertheless, the existence of transmission

  10. Studying localized corrosion using liquid cell transmission electron microscopy

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Chee, See Wee; Pratt, Sarah H.; Hattar, Khalid; Duquette, David; Ross, Frances M.; Hull, Robert

    2014-11-07

    Using liquid cell transmission electron microscopy (LCTEM), localized corrosion of Cu and Al thin films immersed in aqueous NaCl solutions was studied. We demonstrate that potentiostatic control can be used to initiate pitting and that local compositional changes, due to focused ion beam implantation of Au+ ions, can modify the corrosion susceptibility of Al films. A discussion on strategies to control the onset of pitting is also presented.

  11. Prudent behaviour accelerates disease transmission

    E-Print Network [OSTI]

    Scarpino, Samuel V; Hebert-Dufresne, Laurent

    2015-01-01

    Infectious diseases often spread faster near their peak than would be predicted given early data on transmission. Despite the commonality of this phenomena, there are no known general mechanisms able to cause an exponentially spreading dis- ease to begin spreading faster. Indeed most features of real world social networks, e.g. clustering1,2 and community structure3, and of human behaviour, e.g. social distancing4 and increased hygiene5, will slow disease spread. Here, we consider a model where individuals with essential societal roles-e.g. teachers, first responders, health-care workers, etc.- who fall ill are replaced with healthy individuals. We refer to this process as relational exchange. Relational exchange is also a behavioural process, but one whose effect on disease transmission is less obvious. By incorporating this behaviour into a dynamic network model, we demonstrate that replacing individuals can accelerate disease transmission. Furthermore, we find that the effects of this process are trivial w...

  12. Business Plan in Brief : Draft.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA`s draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA`s first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization.

  13. National Electric Transmission Congestion Study

    Office of Environmental Management (EM)

    DOE U.S. Department of Energy DSIRE Database of State Incentives for Renewables & Efficiency EIA Energy Information Administration EISPC Eastern Interconnection States Planning...

  14. The role of transmission investment in the coordination between generation and transmission

    E-Print Network [OSTI]

    Boyer, Edmond

    1 The role of transmission investment in the coordination between generation and transmission Abstract This paper examines how transmission coordinates with generation to the long term in a liberalized generation and transmission of electricity into distinct modules. The governance structure of transmission

  15. American particle and nuclear physics planning

    SciTech Connect (OSTI)

    Montgomery, Hugh E.

    2014-10-01

    In the United States the planning process relevant to future deep inelastic scattering involves both the high energy physics and nuclear physics funding and the two communities. In Canada there is no such split between the communities. Within the past two years there have been several planning initiatives and there may be more to come. We review the current status of both the planning and the plans.

  16. Progress in Initiator Modeling

    SciTech Connect (OSTI)

    Hrousis, C A; Christensen, J S

    2009-05-04

    There is great interest in applying magnetohydrodynamic (MHD) simulation techniques to the designs of electrical high explosive (HE) initiators, for the purpose of better understanding a design's sensitivities, optimizing its performance, and/or predicting its useful lifetime. Two MHD-capable LLNL codes, CALE and ALE3D, are being used to simulate the process of ohmic heating, vaporization, and plasma formation in the bridge of an initiator, be it an exploding bridgewire (EBW), exploding bridgefoil (EBF) or slapper type initiator. The initiation of the HE is simulated using Tarver Ignition & Growth reactive flow models. 1-D, 2-D and 3-D models have been constructed and studied. The models provide some intuitive explanation of the initiation process and are useful for evaluating the potential impact of identified aging mechanisms (such as the growth of intermetallic compounds or powder sintering). The end product of this work is a simulation capability for evaluating margin in proposed, modified or aged initiation system designs.

  17. Power superconducting power transmission cable

    DOE Patents [OSTI]

    Ashworth, Stephen P. (Cambridge, GB)

    2003-01-01

    The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

  18. SYSTEMS BIOLOGY Accurate information transmission

    E-Print Network [OSTI]

    Tsimring, Lev S.

    SYSTEMS BIOLOGY Accurate information transmission through dynamic biochemical signaling networks) and variability in cellular states (extrinsic noise) degrade information transmitted through signaling networks-induced information loss. In the extracellular signal­regulated kinase (ERK), calcium (Ca2+ ), and nuclear factor

  19. Pacific Northwest National Laboratory Institutional Plan FY 2004-2008

    SciTech Connect (OSTI)

    Quadrel, Marilyn J.

    2004-04-15

    This Institutional Plan for FY 2004-2008 is the principal annual planning document submitted to the Department of Energy's Office of Science by Pacific Northwest National Laboratory in Richland, Washington. This plan describes the Laboratory's mission, roles, and technical capabilities in support of Department of Energy priorities, missions, and plans. It also describes the Laboratory strategic plan, key planning assumptions, major research initiatives, and program strategy for fundamental science, energy resources, environmental quality, and national security.

  20. Energy Organizational Planning

    SciTech Connect (OSTI)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty – control and manage their natural resource assets – i.e. develop its own energy resources, meet the current and projected energy needs of their community, and “sit at the table” with other regional energy providers to deal with issues on a peer-to-peer basis.

  1. About the Initiative

    SciTech Connect (OSTI)

    Not Available

    2007-06-01

    This factsheet gives an overview of the Solar America Initiative (SAI), including goals, research and development strategy, market transformation strategy, and benefits to nation.

  2. Strategic Growth Initiative (Michigan)

    Broader source: Energy.gov [DOE]

    A joint venture between Michigan Department of Agriculture and Rural Development (MDARD) and the Michigan Economic Development Corporation (MEDC), the Strategic Growth Initiative Grant Program was...

  3. Innovation Ecosystem Development Initiative

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ideas that address today's most urgent energy challenges. For More Information For more information about the Innovation Ecosystem Initiative, please visit eere.energy.gov...

  4. Salt Waste Processing Initiatives

    Office of Environmental Management (EM)

    Patricia Suggs Salt Processing Team Lead Assistant Manager for Waste Disposition Project Office of Environmental Management Savannah River Site Salt Waste Processing Initiatives 2...

  5. UW-Milwaukee Strategic Planning Expanded Core Team Meeting Minutes

    E-Print Network [OSTI]

    Saldin, Dilano

    UW-Milwaukee Strategic Planning Expanded Core Team Meeting Minutes April 9, 2014 The strategic plan a chancellor as a "rock star." We are (all) UWM. The complete strategic plan will not be reported today draft strategic goals supported by 16 initiatives. Action plans and metrics will come be developed

  6. O&M strategic plan April 7, 2015

    E-Print Network [OSTI]

    Update on O&M strategic plan April 7, 2015 #12;Background Over the past three decades, BPA has mitigation requirements. 2 #12;O&M Strategic planning Planning Elements Fish and Wildlife Committee Initial (Programmatic Issue #C) Asset Management Strategy Developing a Strategic Plan for Public Review 3 #12

  7. Method and apparatus for executing a shift in a hybrid transmission

    DOE Patents [OSTI]

    Gupta, Pinaki; Kaminsky, Lawrence A; Demirovic, Besim

    2013-09-03

    A method for executing a transmission shift in a hybrid transmission including first and second electric machines includes executing a shift-through-neutral sequence from an initial transmission state to a target transmission state including executing an intermediate shift to neutral. Upon detecting a change in an output torque request while executing the shift-through-neutral sequence, possible recovery shift paths are identified. Available ones of the possible recovery shift paths are identified and a shift cost for each said available recovery shift path is evaluated. The available recovery shift path having a minimum shift cost is selected as a preferred recovery shift path and is executed to achieve a non-neutral transmission state.

  8. Transmission of a quantum state in a periodically poled nonlinear crystal

    E-Print Network [OSTI]

    Ranjit Singh

    2010-05-03

    Theoretical calculations on transmission of quantum states such as Schr\\"{o}dinger cat (SC) states are considered in a periodically poled nonlinear crystal (PPNC). Combinations of various initial states (SC, coherent (C),and vacuum (V)) of light waves at frequencies $\\omega_{e}$ and $3\\omega_{e}$ at the input of a PPNC are studied. It is shown that the transmission and interference between superposition of macroscopically distinguishable states can be achieved by using a PPNC. Visualization and analyzes of transmission and interference processes are demonstrated with the help of reduced Wigner quasi-probability distribution functions of considered light waves.

  9. Electric and magnetic field reduction by alternative transmission line options

    SciTech Connect (OSTI)

    Stewart, J.R. (Power Technologies, Inc., Schenectady, NY (United States)); Dale, S.J. (Oak Ridge National Lab., TN (United States)); Klein, K.W. (Energetics, Inc., Columbia, MD (United States))

    1991-01-01

    Ground level electric, and more recently magnetic, fields from overhead power transmission lines are increasingly important considerations in right of way specification, with states setting or planning to set edge of right of way limits. Research has been conducted in high phase order power transmission wherein six of twelve phases are used to transmit power in less physical space and with reduced electrical environmental effects than conventional designs. The first magnetic field testing, as reported in this paper, has verified predictive methods for determination of magnetic fields from high phase order lines. Based on these analytical methods, field profiles have been determined for lines of different phase order of comparable power capacity. Potential advantages of high phase order as a means of field mitigation are discussed. 10 refs., 12 figs., 3 tabs.

  10. Coordination of Transmission Line Transfer Capabilities

    E-Print Network [OSTI]

    Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Industry Representative Richard Goddard Portland General Electric Research Team Students Yuan Li Yonghong

  11. Wireless power transmission for medical applications

    E-Print Network [OSTI]

    Payne, Joshua E.

    We studied the wireless power transmission capabilities of microwave through human skin-tissue. Microwave transmission through simulated human skins was tested with rectenna array as a power receiver located under the ...

  12. WECC Variable Generation Planning Reference Book: Appendices

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Du, Pengwei; Etingov, Pavel V.; Ma, Jian; Vyakaranam, Bharat

    2013-05-13

    The document titled “WECC Variable Generation Planning Reference Book”. This book is divided into two volumes; one is the main document (volume 1)and the other is appendices (volume 2). The main document is a collection of the best practices and the information regarding the application and impact of variables generation on power system planning. This volume (appendices) has additional information on the following topics: Probabilistic load flow problems. 2. Additional useful indices. 3. high-impact low-frequency (HILF) events. 4. Examples of wide-area nomograms. 5. Transmission line ratings, types of dynamic rating methods. 6. Relative costs per MW-km of different electric power transmission technologies. 7. Ultra-high voltage (UHV) transmission. 8.High voltage direct current (VSC-HVDC). 9. HVDC. 10. Rewiring of existing transmission lines. 11. High-temperature low sag (HTLS) conductors. 12. The direct method and energy functions for transient stability analysis in power systems. 13.Blackouts caused by voltage instability. 14. Algorithm for parameter continuation predictor-corrector methods. 15. Approximation techniques available for security regions. 16. Impacts of wind power on power system small signals stability. 17. FIDVR. 18. FACTS. 19. European planning standard and practices. 20. International experience in wind and solar energy sources. 21. Western Renewable Energy Zones (WREZ). 22. various energy storage technologies. 23. demand response. 24. BA consolidation and cooperation options. 25. generator power management requirements and 26. European planning guidelines.

  13. Transmission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState ofSavings forTitleJulyAmyDepartment ofMelissa~

  14. Midwest Transmission Workshop II Summary

    SciTech Connect (OSTI)

    Kevin Bryan

    2002-12-05

    OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

  15. Analytic bounds on transmission probabilities

    E-Print Network [OSTI]

    Boonserm, Petarpa

    2009-01-01

    We develop some new analytic bounds on transmission probabilities (and the related reflection probabilities and Bogoliubov coefficients) for generic one-dimensional scattering problems. To do so we rewrite the Schrodinger equation for some complicated potential whose properties we are trying to investigate in terms of some simpler potential whose properties are assumed known, plus a (possibly large) "shift" in the potential. Doing so permits us to extract considerable useful information without having to exactly solve the full scattering problem.

  16. Energy Transmission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015 Infographic courtesyEducationNevadaSessionToo! |October 4,Transmission

  17. Average transmission probability of a random stack

    E-Print Network [OSTI]

    Yin Lu; Christian Miniatura; Berthold-Georg Englert

    2009-07-31

    The transmission through a stack of identical slabs that are separated by gaps with random widths is usually treated by calculating the average of the logarithm of the transmission probability. We show how to calculate the average of the transmission probability itself with the aid of a recurrence relation and derive analytical upper and lower bounds. The upper bound, when used as an approximation for the transmission probability, is unreasonably good and we conjecture that it is asymptotically exact.

  18. Transmission and Generation Investment in Electricity Markets

    E-Print Network [OSTI]

    Mar 4, 2015 ... Transmission and Generation Investment in Electricity Markets: The Effects of Market Splitting and Network Fee Regimes.

  19. Washington/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Avista, Pacificorp, Puget Sound Energy, Tacoma Public Utilities, Bonneville Power Administration, Columbia Grid, Northern Tier Transmission Group, and Seattle City...

  20. Guide to IT Capital Planning and Investment Control

    Office of Environmental Management (EM)

    improve how they plan, select, fund, control, and evaluate IT initiatives. The Clinger-Cohen Act, formerly the Information Technology Management Reform Act of 1996 (ITMRA),...

  1. Reports of the Fusion Energy Science Advisory Committee Strategic Planning

    E-Print Network [OSTI]

    Strategic Planning for U.S. Fusion Energy Sciences Program of recommended strategic initiatives and associated program-wide FES investments. FESAC recommends more extensive

  2. State Energy Program Strategic Plan for the 21st Century

    Broader source: Energy.gov [DOE]

    Representatives of DOE and the States initiated development of this Strategic Plan to clearly define the program's goals for the next 10 years.

  3. Coiled transmission line pulse generators

    DOE Patents [OSTI]

    McDonald, Kenneth Fox (Columbia, MO)

    2010-11-09

    Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

  4. Planning & Budgeting Brief http://www.washington.edu/admin/pb/home/

    E-Print Network [OSTI]

    Van Volkenburgh, Elizabeth

    Planning & Budgeting Brief http://www.washington.edu/admin/pb/home/ Page 1 Date: May 15, 2012 Subject: University of Washington Update on Current Seattle Campus Planning Initiatives The Office of Planning and Budgeting (OPB) coordinates and oversees physical campus planning initiatives

  5. BPA, Electric Transmission Overview, October 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Electric Transmission Overview Electric transmission Electric transmission is the process by which large amounts of...

  6. July 2, 2007 1 Optimal Transmission Switching

    E-Print Network [OSTI]

    Mangasarian, Olvi L.

    . INTRODUCTION n large electric networks, transmission is traditionally characterized as a static systemJuly 2, 2007 1 Optimal Transmission Switching Emily Bartholomew Fisher, Student Member, IEEE an optimal generation dispatch and transmission topology to meet a specific inflexible load as a mixed

  7. Smart Grid Application of Optimal Transmission Switching

    E-Print Network [OSTI]

    Ferris, Michael C.

    ;6 Introduction continued Electric Transmission Network Flow Problem Optimal Power Flow (OPF) AlternatingSmart Grid Application of Optimal Transmission Switching By, Kory W. Hedman, et al.* University (Professor, UC Berkeley) #12;2 Motivation Co-optimize transmission topology and generation dispatch

  8. Chopper Modulation Improves OTA Information Transmission

    E-Print Network [OSTI]

    Maryland at College Park, University of

    Chopper Modulation Improves OTA Information Transmission Nicole M Nelson and Pamela A Abshire 20742 Email: {nmnelson,pabshire}@umd.edu Abstract-- We have investigated information transmission- ing the channel capacity for transmission of analog signals through an OTA using an information

  9. Transmission eigenvalues for degenerate and singular cases

    E-Print Network [OSTI]

    Sylvester, John

    Transmission eigenvalues for degenerate and singular cases Valery Serov and John Sylvester Abstract We prove the existence of infinitely many real interior transmission eigenvalues for positive transmission eigenvalues. We will prove that positive values of the square of the wavenumber k2 for which

  10. Social transmission of face preferences among humans

    E-Print Network [OSTI]

    Indiana University

    Social transmission of face preferences among humans Benedict C. Jones1,*, Lisa M. DeBruine1 researchers to propose that social transmission of mate preferences may influence sexual selection for male traits. Although it has been suggested that social transmission may also influence mate preferences

  11. Transmission Eigenvalues in One Dimension John Sylvester

    E-Print Network [OSTI]

    Sylvester, John

    Transmission Eigenvalues in One Dimension John Sylvester Abstract We show how to locate all the transmission eigenvalues for a one dimensional constant index of refraction on an interval. 1 Introduction #12;Whenever such a nontrivial pair exists, we say that k2 is an interior transmission eigenvalue

  12. Transmission consequences of coinfection: cytokines writ large?

    E-Print Network [OSTI]

    Transmission consequences of coinfection: cytokines writ large? Andrea L. Graham1 , Isabella M between- host transmission. Cytokines, immune signalling mol- ecules with a fundamental role-host transmission represents a major challenge in parasite ecology and applied biomedicine [1­5]. Co- infection (see

  13. Haykin Chapter 4 Baseband Pulse Transmission

    E-Print Network [OSTI]

    Al-Ghadhban, Samir

    1/30/2014 1 Haykin Chapter 4 Baseband Pulse Transmission EE571 Dr. Samir Alghadhban KFUPM 1 · In this chapter we study the transmission of digital data (of whatever origin) over a baseband channel. · Baseband transmission of digital data requires the use of a lowpass channel with a bandwidth large enough

  14. A Distributed System for Cooperative MIMO Transmissions

    E-Print Network [OSTI]

    Kalyanaraman, Shivkumar

    a distributed system for facilitating cooperative MIMO transmissions in networks without multiple antenna diversity can be leveraged at the network, link or physical layers to provide energy efficient transmissions for reliable low-power transmissions. The rest of this paper is organized as follows: the proposed system

  15. Energy Transition Initiative

    Office of Energy Efficiency and Renewable Energy (EERE)

    Through the Energy Transition Initiative (ETI), the U.S. Department of Energy and its partners work with government entities and other stakeholders to establish a long-term energy vision and successfully implement energy efficiency and renewable energy solutions.

  16. Comments of New England Electric Transmission Corporation on...

    Office of Environmental Management (EM)

    out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and...

  17. Idaho/Transmission/State Regulations | Open Energy Information

    Open Energy Info (EERE)

    direct authority to site high-voltage transmission lines is limited to transmission lines located within National Interstate Electric Transmission Corridors (NIETC); however,...

  18. Electricity transmission congestion costs: A review of recent reports

    E-Print Network [OSTI]

    Lesieutre, Bernard C.; Eto, Joseph H.

    2003-01-01

    Commission). 2001. Electric Transmission Constraint Study.by the Office of Electric Transmission and Distribution ofCommission (FERC), Electric Transmission Constraint Study (

  19. 2009 Electric Transmission Congestion Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the...

  20. Transmission Project Reporting FPA 216h | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information Center Reporting Transmission Project Reporting FPA 216h Transmission Project Reporting FPA 216h View the searchable database of all transmission projects...

  1. Oahu Wind Integration and Transmission Study (OWITS): Hawaiian...

    Office of Environmental Management (EM)

    Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands...

  2. Modeling Interregional Transmission Congestion in the National Energy Modeling System

    E-Print Network [OSTI]

    Gumerman, Etan; Chan, Peter; Lesieutre, Bernard; Marnay, Chris; Wang, Juan

    2006-01-01

    NEMS does not track electricity transmission within regions,international electricity transmission with Canada andwhen solving for electricity transmission, the coal plants

  3. Electricity transmission congestion costs: A review of recent reports

    E-Print Network [OSTI]

    Lesieutre, Bernard C.; Eto, Joseph H.

    2003-01-01

    LBNL-54049 Electricity Transmission Congestion Costs: Astate of U.S. electricity transmission system and whether itof the U.S. electricity transmission system for enabling

  4. Allocating Transmission to Mitigate Market Power in Electricity Markets

    E-Print Network [OSTI]

    Gilbert, Richard; Neuhoff, Karsten; Newberry, David

    2002-01-01

    A. In Europe most electricity transmission auctions areare possible on every electricity transmission link in thepassive transmission rights in congested electricity systems

  5. Initiatives | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuelsof EnergyApril 2014 | Department ofInfrastructure andInitiatives Initiatives

  6. Building Registration Plans (Plan Ahead)

    E-Print Network [OSTI]

    Pavlov, Ronnie

    or edit plans you've already created. #12;Now enter your course search requirements. Then click the Search not be offered in the term you are creating. You can search by Subject, Course Number, Keyword, Title, Level to the Registration Screen, click on Plan Ahead. Next, you need to select the term for which you wish to create

  7. Distortion-transmission trade-off in real-time transmission of Gauss-Markov sources

    E-Print Network [OSTI]

    Mahajan, Aditya

    Distortion-transmission trade-off in real-time transmission of Gauss-Markov sources Jhelum.mahajan@mcgill.ca Abstract--The problem of optimal real-time transmission of a Gauss-Markov source under constraints on the expected number of transmissions is considered. This setup is motivated by applica- tions where

  8. Real Time Voice Transmission Darshana Shah Real Time Voice transmission over Wireless medium using

    E-Print Network [OSTI]

    Yu, Chansu

    to 300+ MHz Receiver #12;Real Time Voice Transmission Darshana Shah - 3 - LFTX -- DC-30 MHz TransmitterReal Time Voice Transmission Darshana Shah - 1 - Real Time Voice transmission over Wireless medium Yu 06/07/2009 #12;Real Time Voice Transmission Darshana Shah - 2 - Abstract My project is to transmit

  9. Automated manual transmission mode selection controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (Whitmore Lake, MI)

    1999-11-09

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  10. Automated manual transmission shift sequence controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (Whitmore Lake, MI); Reed, Richard G. (Royal Oak, MI); Rausen, David J. (Denver, CO)

    2000-02-01

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  11. SUBMITTED TO IEEE TRANSACTIONS ON POWER SYSTEMS, FEBRUARY 2002 1 Quantifying Transmission Reliability Margin

    E-Print Network [OSTI]

    small enough to permit accurate Monte-Carlo simulations. The formula contributes to more accurate congestion contracts. In both planning and operations, transmission capability can be used to assess power centers-small firms collaborative R&D ini- tiative grant EEC-9815325 and grant ECS-9988574 is gratefully

  12. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, Russell B. (Oakland, CA)

    1987-01-01

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  13. DOE Transmission System Integration Workshop

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i pStateDOE FederalTheofHeyeck, AEP, Sr. Vice President, Transmission and

  14. Sandia Energy - Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II)GeothermalFuel Magnetization andStochasticuniqueCuriosity'sTransmission

  15. Recovery Act: Local Energy Assurance Planning Initiatives | Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    will help ensure local governments can recover and restore power quickly following any energy supply disruptions. PRESS RELEASES February 19, 2010 Secretary Chu Announces Over...

  16. Operational Plan and Desktop Reference - Veterans Employment Initiative |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergy Managing853926 NewsORMATDepartmentEnergy AprilDecember 10,Department

  17. Richmond Electric Vehicle Initiative Electric Vehicle Readiness Plan |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct.7,BreakoutRetoolingREVIEWRichard Karney AboutDepartment

  18. Best-In-Class Project Management Initiative Corporate Implementation Plan |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p a l De p uBUSEnergy| Department

  19. Implementation Plan and Initial Development of Nuclear Concrete Materials

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12,ExecutiveFinancingREnergy Tools forEnergyofDepartment

  20. Recovery Act Local Energy Assurance Planning (LEAP) Initiative Funding

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget ||DepartmentReadoutReviewRecordRecovery Act

  1. Best-in-Class Project Management Initiative Corporate Implementation Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram:Y-12Power, Inc |BartlesvilleRestoring ElectricalConstruction

  2. Recovery Act: Local Energy Assurance Planning Initiatives | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow YourDepartment

  3. The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions

    E-Print Network [OSTI]

    transmission right, electricity auction, simultaneous feasibility, transmission pricing. I. INTRODUCTION POINTThe Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions Shi as financial transmission rights (FTRs), resulting from centralized auctions conducted by Independent System

  4. RCRA facility stabilization initiative

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    The RCRA Facility Stabilization Initiative was developed as a means of implementing the Corrective Action Program`s management goals recommended by the RIS for stabilizing actual or imminent releases from solid waste management units that threaten human health and the environment. The overall goal of stabilization is to, as situations warrant, control or abate threats to human health and/or the environment from releases at RCRA facilities, and/or to prevent or minimize the further spread of contamination while long-term remedies are pursued. The Stabilization initiative is a management philosophy and should not be confused with stabilization technologies.

  5. Clean Coal Power Initiative

    SciTech Connect (OSTI)

    Doug Bartlett; Rob James; John McDermott; Neel Parikh; Sanjay Patnaik; Camilla Podowski

    2006-03-31

    This report is the fifth quarterly Technical Progress Report submitted by NeuCo, Incorporated, under Award Identification Number, DE-FC26-04NT41768. This award is part of the Clean Coal Power Initiative (''CCPI''), the ten-year, $2B initiative to demonstrate new clean coal technologies in the field. This report is one of the required reports listed in Attachment B Federal Assistance Reporting Checklist, part of the Cooperative Agreement. The report covers the award period January 1, 2006 - March 31, 2006 and NeuCo's efforts within design, development, and deployment of on-line optimization systems during that period.

  6. Terahertz Quantum-Cascade Transmission-Line Metamaterials

    E-Print Network [OSTI]

    Tavallaee, Amir Ali

    2012-01-01

    Transmission-Line Metamaterials . . . . . . . Terahertz CRLHCRLH Transmission-Line Metamaterials . . . . . . . 112losses in negative-index metamaterials by optical parametric

  7. Report of the Task Force on Statewide Transmission Siting and...

    Open Energy Info (EERE)

    and disadvantages of a statewide transmission siting and permitting framwork for electric transmission facilities, and provides recommendations for improvement. Author...

  8. Modeling Interregional Transmission Congestion in the National Energy Modeling System

    E-Print Network [OSTI]

    Gumerman, Etan; Chan, Peter; Lesieutre, Bernard; Marnay, Chris; Wang, Juan

    2006-01-01

    to a load center via a DC transmission line such that flowsD.C. 127 pages. Modeling Interregional Transmission

  9. Wind Integration, Transmission, and Resource Assessment andCharacteri...

    Office of Environmental Management (EM)

    Integration, Transmission, and Resource Assessment and Characterization Projects Wind Integration, Transmission, and Resource Assessment and Characterization Projects This report...

  10. Palouse Subbasin Management Plan 3. Management Plan

    E-Print Network [OSTI]

    Palouse Subbasin Management Plan 3. Management Plan FINAL DRAFT ~ May 2004 Project Lead: Palouse-Rock Lake Conservation District Trevor Cook, Project Manager PO Box 438 St. John WA 99171 (509) 648;Palouse Subbasin Plan: MANAGEMENT PLAN Management Plan: Page 3 - 1 3. Management Plan 3.1 Background

  11. Institutional Plan FY 2001-2005

    SciTech Connect (OSTI)

    Chartock, Michael; Hansen, Todd, editors

    2000-07-01

    The FY 2001-2005 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.

  12. Sustainability Initiative Executive Summary

    E-Print Network [OSTI]

    Sheridan, Jennifer

    UW­Madison Sustainability Initiative Executive Summary October 2010 #12;2 We are pleased to present the final report of the campus Sustainability Task Force. This report fulfills the charge we gave to sustainability for consideration by UW­Madison's leadership and campus community. There are many reasons why

  13. Initiative for Explosives Detection

    E-Print Network [OSTI]

    of electromagnetic radiation, or to detect with currently fielded technologies. Approaches to improving detectionInitiative for Explosives Detection Highly Concealed Bulk Explosives Detection This focus area emphasizes the detection of explosives or IEDs hidden in vehicles, buildings or various types of containers

  14. Monolithic exploding foil initiator

    DOE Patents [OSTI]

    Welle, Eric J; Vianco, Paul T; Headley, Paul S; Jarrell, Jason A; Garrity, J. Emmett; Shelton, Keegan P; Marley, Stephen K

    2012-10-23

    A monolithic exploding foil initiator (EFI) or slapper detonator and the method for making the monolithic EFI wherein the exploding bridge and the dielectric from which the flyer will be generated are integrated directly onto the header. In some embodiments, the barrel is directly integrated directly onto the header.

  15. Clean Energy Manufacturing Initiative

    SciTech Connect (OSTI)

    2013-04-01

    The initiative will strategically focus and rally EERE’s clean energy technology offices and Advanced Manufacturing Office around the urgent competitive opportunity for the United States to be the leader in the clean energy manufacturing industries and jobs of today and tomorrow.

  16. BRAZIL RESEARCH INITIATIVES

    E-Print Network [OSTI]

    Liu, Taosheng

    BRAZIL RESEARCH INITIATIVES Michigan State University (MSU) identifies Brazil as a global priority and challenges become increasingly part of the U.S.-Brazil agenda, MSU desires partnerships aimed at producing in the U.S. and one in Brazil, to share research strategies and explore joint projects in several research

  17. Concurrent in situ ion irradiation transmission electron microscope

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hattar, K.; Bufford, D. C.; Buller, D. L.

    2014-08-29

    An in situ ion irradiation transmission electron microscope has been developed and is operational at Sandia National Laboratories. This facility permits high spatial resolution, real time observation of electron transparent samples under ion irradiation, implantation, mechanical loading, corrosive environments, and combinations thereof. This includes the simultaneous implantation of low-energy gas ions (0.8–30 keV) during high-energy heavy ion irradiation (0.8–48 MeV). In addition, initial results in polycrystalline gold foils are provided to demonstrate the range of capabilities.

  18. USDrive Partnership Plan, December 2014

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-Sessions | Department ofVP of TransmissionIT Tools JOHNand DemonstrationPlan

  19. Method and apparatus for executing an asynchronous clutch-to-clutch shift in a hybrid transmission

    DOE Patents [OSTI]

    Demirovic, Besim; Gupta, Pinaki; Kaminsky, Lawrence A.; Naqvi, Ali K.; Heap, Anthony H.; Sah, Jy-Jen F.

    2014-08-12

    A hybrid transmission includes first and second electric machines. A method for operating the hybrid transmission in response to a command to execute a shift from an initial continuously variable mode to a target continuously variable mode includes increasing torque of an oncoming clutch associated with operating in the target continuously variable mode and correspondingly decreasing a torque of an off-going clutch associated with operating in the initial continuously variable mode. Upon deactivation of the off-going clutch, torque outputs of the first and second electric machines and the torque of the oncoming clutch are controlled to synchronize the oncoming clutch. Upon synchronization of the oncoming clutch, the torque for the oncoming clutch is increased and the transmission is operated in the target continuously variable mode.

  20. Magnetically insulated transmission line oscillator

    DOE Patents [OSTI]

    Bacon, L.D.; Ballard, W.P.; Clark, M.C.; Marder, B.M.

    1987-05-19

    A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields are produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap. 11 figs.

  1. Superconducting transmission line particle detector

    DOE Patents [OSTI]

    Gray, Kenneth E. (Naperville, IL)

    1989-01-01

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

  2. Shock transmissibility of threaded joints

    SciTech Connect (OSTI)

    Hansen, N.R.; Bateman, V.I.; Brown, F.A.

    1996-12-31

    Sandia National Laboratories (SNL) designs mechanical systems with threaded joints that must survive high shock environments. These mechanical systems include penetrators that must survive soil and rock penetration; drilling pipe strings that must survive rock-cutting, shock environments; and laydown weapons that must survive delivery impact shock. This paper summarizes an analytical study and an experimental evaluation of compressive, one-dimensional, shock transmission through a threaded joint in a split Hopkinson bar configuration. Thread geometries were scaled to simulate large diameter threaded joints with loadings parallel to the axis of the threads. Both strain and acceleration were evaluated with experimental measurements and analysis. Analytical results confirm the experimental conclusions that in this split Hopkinson bar configuration, the change in the one-dimensional shock wave by the threaded joint is localized to a length equal to a few diameters` length beyond the threaded joint.

  3. Magnetically insulated transmission line oscillator

    DOE Patents [OSTI]

    Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

    1988-01-01

    A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

  4. Superconducting transmission line particle detector

    DOE Patents [OSTI]

    Gray, K.E.

    1988-07-28

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

  5. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Reliability Projects Expand Projects Skip navigation links Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement...

  6. WESTERN MONTANA ELECTRIC GENERATING & TRANSMISSION COOPERATIVE, INC.

    E-Print Network [OSTI]

    1 WESTERN MONTANA ELECTRIC GENERATING & TRANSMISSION COOPERATIVE, INC. 1001 SW Higgins, Panorama, but not the more fundamental issues of stakeholder definition, future role, governance and structure. We

  7. DOE Affirms National Interest Electric Transmission Corridor...

    Broader source: Energy.gov (indexed) [DOE]

    requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as...

  8. Coordination of Federal Authorizations for Electric Transmission...

    Broader source: Energy.gov (indexed) [DOE]

    rulemaking and opportunity for comment on the coordination of federal authorizations for electric transmission facilities, September 19, 2008 Coordination of Federal...

  9. Transmission Services Product Pricing Validation - September...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission-Services-Product-Pricing-Validation---September-17,-2015 Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer...

  10. California - Establishing Transmission Project Review Streamlining...

    Open Energy Info (EERE)

    California - Establishing Transmission Project Review Streamlining Directives Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  11. Transmission eigenvalues for operators with constant coefficients

    E-Print Network [OSTI]

    Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

    2010-04-28

    In this paper we study the interior transmission problem and transmission eigenvalues for multiplicative perturbations of linear partial differential operator of order $\\ge 2$ with constant real coefficients. Under suitable growth conditions on the symbol of the operator and the perturbation, we show the discreteness of the set of transmission eigenvalues and derive sufficient conditions on the existence of transmission eigenvalues. We apply these techniques to the case of the biharmonic operator and the Dirac system. In the hypoelliptic case we present a connection to scattering theory.

  12. Northern Pass Transmission Line Project Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    the location of the September 26 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. On...

  13. Memorandum of Understanding Regarding Transmission Siting on...

    Open Energy Info (EERE)

    Memorandum of Understanding Regarding Transmission Siting on Federal Land (2009) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Memorandum of...

  14. Transmission Services Commercial Systems Support and Development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Call Agenda This customer conference call will provide updates concerning BPA Transmission Services' commercial systems support and development efforts. It will also provide...

  15. Reminder: Transmission Services Product Pricing Validation -...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission-Services-Product-Pricing-Validation---September-24,-2015 Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer...

  16. Memorandum of Understanding Regarding Transmission Siting on...

    Open Energy Info (EERE)

    Memorandum of Understanding Regarding Transmission Siting on Federal Land (2006) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Memorandum of...

  17. State Strategies for Accelerating Transmission Development for...

    Open Energy Info (EERE)

    State Strategies for Accelerating Transmission Development for Renewable Energy Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: State Strategies for...

  18. Flexible Transmission in the Smart Grid

    E-Print Network [OSTI]

    Hedman, Kory Walter

    2010-01-01

    New England Outlook: Smart Grid is About Consumers,” Apr. [Transmission in the Smart Grid By Kory Walter Hedman ATransmission in the Smart Grid by Kory Walter Hedman Doctor

  19. Energy Department, Arizona Utilities Announce Transmission Infrastruct...

    Office of Environmental Management (EM)

    Group, a collection of public power companies that include several Western firm electric and transmission service customers. Western's borrowing authority, received as part...

  20. Wyoming/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Lower Valley Energy, High West Energy, Western Area Power Administration, Bonneville Power Administration, Tri-State Generation and Transmission Association, Inc., and Rocky...

  1. California/Transmission | Open Energy Information

    Open Energy Info (EERE)

    San Diego Gas & Electric, Sacramento Municipal Utility District, PacifiCorp, Bonneville Power Administration, Transmission Agency of Northern California, and Western Area Power...

  2. Nevada/Transmission | Open Energy Information

    Open Energy Info (EERE)

    own transmission facilities in the State of Nevada: NV Energy, Bonneville Power Administration, and Valley Electric Association, Colorado River Commission, Los...

  3. Oregon/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Electric Cooperative, Columbia Grid, Northern Tier Transmission Group, and Bonneville Power Administration. Oregon Energy Policy The Oregon Department of Energy's Governor's...

  4. Detonator comprising a nonlinear transmission line

    DOE Patents [OSTI]

    Elizondo-Decanini, Juan M

    2014-12-30

    Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

  5. Western Area Power Administration Transmission Infrastructure...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    connecting near line's midpoint 161 million in TIP funding; 213 million project cost Substation construction began June 2010 Transmission construction began...

  6. Briefing Memo: Petroleum Product Transmission & Distribution...

    Broader source: Energy.gov (indexed) [DOE]

    PDF of the briefing memo. Briefing Memo More Documents & Publications Briefing Memo: Petroleum Product Transmission & Distribution The Quadrennial Energy Review (Full Report)...

  7. Proponent's Environmental Assessment (PEA) Checklist for Transmission...

    Open Energy Info (EERE)

    Proponent's Environmental Assessment (PEA) Checklist for Transmission Line and Substation Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  8. Institutional plan. FY 1997-2002

    SciTech Connect (OSTI)

    NONE

    1996-06-01

    The FY 1997-2002 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. Of particular significance this year is the role of computing sciences in supporting a broad range of research activities, at Berkeley Lab in particular and throughout the entire Department of Energy system in general. The Institutional Plan is a management report for integration with the Department of Energy`s mission and programs and is an element of Department of Energy`s strategic management planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives.

  9. Strategic Planning Student Town Hall Event December 2, 2014

    E-Print Network [OSTI]

    Sun, Yi

    Strategic Planning Student Town Hall Event December 2, 2014 into the College's strategic planning initiative. Introductory remarks included a description of the Provost's role at the College and of his charge to help create the strategic plan with broadbased campus input

  10. O&M strategic plan Fish and Wildlife Committee

    E-Print Network [OSTI]

    Update on O&M strategic plan Fish and Wildlife Committee February 10, 2015 #12;Background Over, but will continue to help BPA meet its mitigation requirements. 2 #12;O&M Strategic planning Initial steps #C) Next steps in developing a Strategic Plan for Public Review Proposed Categories Screens

  11. Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

  12. An Addendum to Texas Tech University's Making it possible... 2010-2020 Strategic Plan Strategic Plan for Research

    E-Print Network [OSTI]

    Rock, Chris

    An Addendum to Texas Tech University's Making it possible... 2010-2020 Strategic Plan Strategic in direction? in the fall of 2008 President Guy Bailey met with the Texas Tech University (TTU) strategic Plan- ning council and initiated a strategic planning process utilizing a paper entitled, "What makes

  13. Molecular insight into conformational transmission of human P-glycoprotein

    SciTech Connect (OSTI)

    Chang, Shan-Yan [Department of Biochemical Engineering and Key Laboratory of Systems Bioengineering of the Ministry of Education, School of Chemical Engineering and Technology, Tianjin University, Tianjin 300072 (China)] [Department of Biochemical Engineering and Key Laboratory of Systems Bioengineering of the Ministry of Education, School of Chemical Engineering and Technology, Tianjin University, Tianjin 300072 (China); Liu, Fu-Feng, E-mail: fufengliu@tju.edu.cn, E-mail: ysun@tju.edu.cn; Dong, Xiao-Yan; Sun, Yan, E-mail: fufengliu@tju.edu.cn, E-mail: ysun@tju.edu.cn [Department of Biochemical Engineering and Key Laboratory of Systems Bioengineering of the Ministry of Education, School of Chemical Engineering and Technology, Tianjin University, Tianjin 300072 (China) [Department of Biochemical Engineering and Key Laboratory of Systems Bioengineering of the Ministry of Education, School of Chemical Engineering and Technology, Tianjin University, Tianjin 300072 (China); Collaborative Innovation Center of Chemical Science and Engineering (Tianjin), Tianjin 300072 (China)

    2013-12-14

    P-glycoprotein (P-gp), a kind of ATP-binding cassette transporter, can export candidates through a channel at the two transmembrane domains (TMDs) across the cell membranes using the energy released from ATP hydrolysis at the two nucleotide-binding domains (NBDs). Considerable evidence has indicated that human P-gp undergoes large-scale conformational changes to export a wide variety of anti-cancer drugs out of the cancer cells. However, molecular mechanism of the conformational transmission of human P-gp from the NBDs to the TMDs is still unclear. Herein, targeted molecular dynamics simulations were performed to explore the atomic detail of the conformational transmission of human P-gp. It is confirmed that the conformational transition from the inward- to outward-facing is initiated by the movement of the NBDs. It is found that the two NBDs move both on the two directions (x and y). The movement on the x direction leads to the closure of the NBDs, while the movement on the y direction adjusts the conformations of the NBDs to form the correct ATP binding pockets. Six key segments (KSs) protruding from the TMDs to interact with the NBDs are identified. The relative movement of the KSs along the y axis driven by the NBDs can be transmitted through ?-helices to the rest of the TMDs, rendering the TMDs to open towards periplasm in the outward-facing conformation. Twenty eight key residue pairs are identified to participate in the interaction network that contributes to the conformational transmission from the NBDs to the TMDs of human P-gp. In addition, 9 key residues in each NBD are also identified. The studies have thus provided clear insight into the conformational transmission from the NBDs to the TMDs in human P-gp.

  14. Low Frequency Transmission Final Project Report

    E-Print Network [OSTI]

    Low Frequency Transmission Final Project Report Power Systems Engineering Research Center Empowering Minds to Engineer the Future Electric Energy System #12;Low Frequency Transmission Final Project This is the final report for the Power Systems Engineering Research Center (PSERC) research project S-42 titled "Low

  15. Policy Issues for Retail Beamed Power Transmission

    E-Print Network [OSTI]

    electric power on Earth is transmitted using wired power transmission systems. In this system, electricalPolicy Issues for Retail Beamed Power Transmission Girish Chowdhary, Rajeev Gadre, Narayanan solar electric power using retail delivery of beamed power. Recent advances in power beaming have made

  16. Spatial mode properties of plasmon assisted transmission

    E-Print Network [OSTI]

    Xi-Feng Ren; Guo-Ping Guo; Yun-Feng Huang; Zhi-Wei Wang; Guang-Can Guo

    2006-09-11

    Orbital angular momentum of photons is explored to study the spatial mode properties of plasmon assisted transmission process. We found that photons carrying different orbital angular momentums have different transmission efficiencies, while the coherence between these spatial modes can be preserved.

  17. Ecological benefits of dc power transmission

    SciTech Connect (OSTI)

    Kutuzova, N. B.

    2011-05-15

    The environmental effects of dc overhead transmission lines are examined. The major effects of ac and dc transmission lines are compared. Dc lines have advantages compared to ac lines in terms of electrical safety for people under the lines, biological effects, corona losses, and clearance width.

  18. Neuromotor Transmissibility of Horizontal Seatpan Vibration

    E-Print Network [OSTI]

    Channamallu, Raghu Ram

    2007-12-16

    for a frequency range of 3-14 Hz at 1 RMS (ms-2) and 2 RMS (ms-2) vibration magnitudes. The mechanical transmission to lumbar rotations did not exhibit resonance within the measured frequency range without the backrest. The mechanical transmission with a...

  19. The New York Transmission Congestion Contract Market

    E-Print Network [OSTI]

    Oren, Shmuel S.

    The New York Transmission Congestion Contract Market: Is It Truly Working Efficiently? An analysis indicates that the financial point-to-point transmission rights auction implemented by the New York, Elsevier Inc., 1040-6190/$­see front matter doi:/10.1016/j.tej.2003.09.006 1 #12;spring of 2000 in the New

  20. RESEARCH INITIATIVE 15: Multiple Roles for GIS in US Global Change Research

    E-Print Network [OSTI]

    California at Santa Barbara, University of

    RESEARCH INITIATIVE 15: Multiple Roles for GIS in US Global Change Research REPORT OF THE FIRST, for their assistance with the conference. #12;2 #12;3 TABLE OF CONTENTS Introduction Background Research Initiative 15" Global change research communities The issues NCGIA plans for the initiative Data Issues Data quality

  1. Future land use plan

    SciTech Connect (OSTI)

    NONE

    1995-08-31

    The US Department of Energy`s (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ``Future Land Use`` initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities` interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory`s view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts.

  2. TRUPACT-1 implementation plan

    SciTech Connect (OSTI)

    Hurley, J.D.; Tappen, J.J. . Joint Integration Office); Christensen, D.S. )

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  3. Through bulkhead initiator studies

    SciTech Connect (OSTI)

    Begeal, D.R.

    1997-03-01

    This report describes recent work done to demonstrate feasibility of a fail-safe Through Bulkhead Initiator with minimum dimensions and suitable for use in cyclical thermal environments. Much of the ground work for a fail-safe TBI was previously done by A.C. Schwartz. This study is an expansion of Schwartz`s work to evaluate devices with bulkheads of 304 stainless steel and Inconel 718; explosive donors of PETN, BNCP, and a 0.005 inch thick steel flying plate donor traveling at 2.6 mm/{micro}s; and explosive acceptors of PETN and BNCP. Bulkhead thickness were evaluated in the range of 0.040 to 0.180 inch. The explosive acceptors initiated a small HMX pellet to drive a 0.005 inch thick steel flying plate, and VISAR histories of the HMX-driven flying plates were the measure of acceptable performance. A companion set of samples used a PMMA acceptor to measure the particle velocities at the bulkhead/PMMA interface with VISAR. These data were used to compute the input pressure to the acceptor explosives in an attempt to measure initiation threshold. Unfortunately, the range of bulkhead thicknesses tested did not give any failures, thus the threshold was not determined. It was found that either explosive or the flying plate would perform as a TBI in the bulkhead thickness range tested. The optimum TBI is about 0.060 inches thick, and steel bulkheads seem to be more structurally sound than those made of Inconel. That is, cross section views of the Inconel bulkheads showed it to be more prone to stress cracking than was the 304 stainless steel. Both PETN and BNCP showed good performance when tested at {minus}65 F following thermal cycling of {minus}65 F to +165 F. Analysis of the TBI function times showed that BNCP acceptor explosives were undergoing the classical deflagration to detonation process. The PETN acceptors were undergoing prompt detonation.

  4. Lift-and-Project Relaxations of AC Microgrid Distribution System Planning

    E-Print Network [OSTI]

    Taylor, Joshua A.

    2011-01-01

    We apply relaxation procedures to polynomial optimization problems that originate in transmission system planning, and obtain new convex formulations for the AC case. The approach is novel because the optimization is ...

  5. Recent Developments in the Regulation of Electric Utility Resource Planning in Texas 

    E-Print Network [OSTI]

    Totten, J.; Adib, P.; Matlock, R.; Treadway, N.

    1993-01-01

    The Texas Legislature has charged the Public Utility Commission of Texas with the responsibility to license utility power plants and transmission lines, and develop a statewide electrical energy plan. Related duties include the encouragement...

  6. UNLV Nuclear Hydrogen Initiative

    SciTech Connect (OSTI)

    Hechanova, Anthony E.; Johnson, Allen; O'Toole, Brendan; Trabia, Mohamed; Peterson, Per

    2012-10-25

    Evaluation of the Crack growth rate (CGR) of Alloy 617 and Alloy 276 under constant K at ambient temperature has been completed. Creep deformation of Alloy 230 at different temperature range and load level has been completed and heat to heat variation has been noticed. Creep deformation study of Alloy 276 has been completed under an applied initial stress level of 10% of yield stress at 950şC. The grain size evaluation of the tested creep specimens of Alloy 276 has been completed.

  7. Feedback stabilization initiative

    SciTech Connect (OSTI)

    NONE

    1997-06-01

    Much progress has been made in attaining high confinement regimes in magnetic confinement devices. These operating modes tend to be transient, however, due to the onset of MHD instabilities, and their stabilization is critical for improved performance at steady state. This report describes the Feedback Stabilization Initiative (FSI), a broad-based, multi-institutional effort to develop and implement methods for raising the achievable plasma betas through active MHD feedback stabilization. A key element in this proposed effort is the Feedback Stabilization Experiment (FSX), a medium-sized, national facility that would be specifically dedicated to demonstrating beta improvement in reactor relevant plasmas by using a variety of MHD feedback stabilization schemes.

  8. 2006 Initial Allocation Awards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDidDevelopmentataboutScalablePhysicist:Possible6 Awards 2006 Initial

  9. Asset Revitalization Initiative ARI

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p a l De p u tCorporationIt's Potential from Tidal StreamsInitiative (

  10. Strategic Planning for Landowners 

    E-Print Network [OSTI]

    Johnson, Jason; Polk, Wade

    2008-09-16

    Strategic planning is crucial to the success of any business. This publication explains the planning process, from establishing the mission, to setting goals, to developing a business plan....

  11. Guidance for Planning Exercises

    Office of Environmental Management (EM)

    blank table of contents Transportation Emergency Preparedness Program (TEPP) planning tools planning tools Guidance f Guidance f Guidance f Guidance f Guidance for Planning,...

  12. Walkability Planning in Jakarta

    E-Print Network [OSTI]

    Lo, Ria S. Hutabarat

    2011-01-01

    key goals in relation to pedestrian planning? What trends dotransportation and planning in Jakarta in the future?pedestrian research or planning in Indonesia, the notion of

  13. Unpredictability and the transmission of numbers

    E-Print Network [OSTI]

    Myers, John M

    2015-01-01

    Curiously overlooked in physics is its dependence on the transmission of numbers. For example the transmission of numerical clock readings is implicit in the concept of a coordinate system. The transmission of numbers and other logical distinctions is often achieved over a computer-mediated communications network in the face of an unpredictable environment. By unpredictable we mean something stronger than the spread of probabilities over given possible outcomes, namely an opening to unforeseeable possibilities. Unpredictability, until now overlooked in theoretical physics, makes the transmission of numbers interesting. Based on recent proofs within quantum theory that provide a theoretical foundation to unpredictability, here we show how regularities in physics rest on a background of channels over which numbers are transmitted. As is known to engineers of digital communications, numerical transmissions depend on coordination reminiscent of the cycle of throwing and catching by players tossing a ball back and...

  14. Adaptation Plan 

    E-Print Network [OSTI]

    Durnbaugh, A.

    2011-01-01

    Response Update the extreme weather operation plan, focusing on vulnerable populations. Add climate-sensitive disease surveillance. Roads Pilot & implement new road materials to manage stormwater, decrease urban heat island effect, & maintain... and dry summers Source: Hayhoe et al. Journal of Great Lakes Research, 2010. Summers % changes relative to a 1961-1990 average ESL-KT-11-11-16 6 What is CCAP? Our goals to reduce Chicago?s greenhouse gas emissions and prepare for climate change?s...

  15. STRATEGIC PLAN

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematics AndBeryllium Disease |Records Management FieldSOLANA SOLANA SOLANA SOLANA-2020 STRATEGIC PLAN and

  16. Plan Execution Failure Analysis Using Plan Deconstruction 

    E-Print Network [OSTI]

    McNeill, F.; Bundy, Alan; Walton, Ch.; Schorlemmer, Marco

    We consider the challenges that arise when plans are based on an incorrect representation of the domain in which they are executed. We describe how information about plan formation, and how the way in which each plan step ...

  17. Initiatives for proliferation prevention

    SciTech Connect (OSTI)

    1997-04-01

    Preventing the proliferation of weapons of mass destruction is a central part of US national security policy. A principal instrument of the Department of Energy`s (DOE`s) program for securing weapons of mass destruction technology and expertise and removing incentives for scientists, engineers and technicians in the newly independent states (NIS) of the former Soviet Union to go to rogue countries or assist terrorist groups is the Initiatives for Proliferation Prevention (IPP). IPP was initiated pursuant to the 1994 Foreign Operations Appropriations Act. IPP is a nonproliferation program with a commercialization strategy. IPP seeks to enhance US national security and to achieve nonproliferation objectives by engaging scientists, engineers and technicians from former NIS weapons institutes; redirecting their activities in cooperatively-developed, commercially viable non-weapons related projects. These projects lead to commercial and economic benefits for both the NIS and the US IPP projects are funded in Russian, Ukraine, Kazakhstan and Belarus. This booklet offers an overview of the IPP program as well as a sampling of some of the projects which are currently underway.

  18. Precision flyer initiator

    DOE Patents [OSTI]

    Frank, A.M.; Lee, R.S.

    1998-05-26

    A precision flyer initiator forms a substantially spherical detonation wave in a high explosive (HE) pellet. An explosive driver, such as a detonating cord, a wire bridge circuit or a small explosive, is detonated. A flyer material is sandwiched between the explosive driver and an end of a barrel that contains an inner channel. A projectile or ``flyer`` is sheared from the flyer material by the force of the explosive driver and projected through the inner channel. The flyer than strikes the HE pellet, which is supported above a second end of the barrel by a spacer ring. A gap or shock decoupling material delays the shock wave in the barrel from predetonating the HE pellet before the flyer. A spherical detonation wave is formed in the HE pellet. Thus, a shock wave traveling through the barrel fails to reach the HE pellet before the flyer strikes the HE pellet. The precision flyer initiator can be used in mining devices, well-drilling devices and anti-tank devices. 10 figs.

  19. Precision flyer initiator

    DOE Patents [OSTI]

    Frank, Alan M. (Livermore, CA); Lee, Ronald S. (Livermore, CA)

    1998-01-01

    A precision flyer initiator forms a substantially spherical detonation wave in a high explosive (HE) pellet. An explosive driver, such as a detonating cord, a wire bridge circuit or a small explosive, is detonated. A flyer material is sandwiched between the explosive driver and an end of a barrel that contains an inner channel. A projectile or "flyer" is sheared from the flyer material by the force of the explosive driver and projected through the inner channel. The flyer than strikes the HE pellet, which is supported above a second end of the barrel by a spacer ring. A gap or shock decoupling material delays the shock wave in the barrel from predetonating the HE pellet before the flyer. A spherical detonation wave is formed in the HE pellet. Thus, a shock wave traveling through the barrel fails to reach the HE pellet before the flyer strikes the HE pellet. The precision flyer initiator can be used in mining devices, well-drilling devices and anti-tank devices.

  20. Wireless Transmission of Monitoring Data out of the HADES Underground Laboratory - 12450

    SciTech Connect (OSTI)

    Schroeder, T.J.; Hart, J. [Nuclear Research and Consultancy Group (NRG), P.O. Box 25, NL-1755 ZG Petten (Netherlands)

    2012-07-01

    As part of the European 7. framework project MoDeRn, Nuclear Research and Consultancy Group (NRG) performed experiments in order to demonstrate the feasibility of wireless data transmission through the subsurface over larger distances by low frequency magnetic fields. The main objective of NRG's contribution is to characterize and optimize the energy use of this technique within the specific context of post-closure monitoring. For this, measurements have been performed in the HADES underground laboratory located at Mol, Belgium, at 225 m depth. The experimental set-up makes use of a loop antenna for the transmitter that has been matched into the existing infrastructure of the HADES. The experimental work of NRG is divided into several stages: in 2010, the necessary hardware has been designed and assembled and tested in the Netherlands. Site-specific magnetic background noise in Mol and frequency-dependent signal attenuation by the geologic medium has been measured. Signal transmission has been demonstrated and several transmission channels around 1 kHz have been identified. In 2011, additional measures and experiments have been performed in order to characterize and test relevant element of the transmission chain and to optimize the energy use of the set-up. A mathematical model description has been developed that includes the most relevant characteristics of the transmitter, receiver and transmission path and was used to analyse possible options to optimize the set-up. In 2012, experiments are planned in order to test several data transmission options. Results so far have shown that signal transmission over larger distances through the subsurface is feasible. However, to make quantitative conclusions on the energy need per bit of transmitted data, additional experiments planned in 2012 are necessary. The experimental and theoretical results gained by NRG, as part of the European 7. framework project MoDeRn, so far demonstrated that signal transmission through 225 m of a geological medium is feasible, even in case of a 'good conductor' as present in Mol. At this particular site the transmission distance through the different layers of clay and sandy aquifers is larger than the skin depth and clearly extends the near-field. The step from signal to data transmission will be made in 2012 and is essential to be able to make quantitative statements of the energy use per transmitted data bit. (authors)

  1. CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN

    E-Print Network [OSTI]

    Kim, Duck O.

    Biological Safety Officer Ergonomic Specialist 2723 Radiation Safety 2250 Facilities Management Office 2125. ANNUAL REVIEW AND EVALUATION OF EFFECTIVENESS OF THE CHEMICAL HYGIENE PLAN 9. HAZARD COMMUNICATION PLAN

  2. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    tax credit Renewable energy Renewable energy credit RegionalColorado: National Renewable Energy Laboratory. http://Colorado: National Renewable Energy Laboratory. NREL/SR-550-

  3. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    wind energy and solar technologies without thermal storageof wind energy and solar technologies that lack thermala small margin only when solar thermal energy is assumed to

  4. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    TOD energy value, and integration cost calculations. Theenergy value)—are subtracted from the delivered cost. Figure 2 illustrates this calculationcalculations, however, this does Marginal Production Cost ($/MWh) The median, 10 th , and 90 th percentile of the TOD energy

  5. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    over the PTC. Lower capital costs and higher and capacityevery 150 miles (mi). The capital cost and transfer capacity6 Table 2. Range of capital costs, capacity factors, and

  6. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    Colorado: National Renewable Energy Laboratory. http://Colorado: National Renewable Energy Laboratory. NREL/SR-550-Finn, J. 2009. Western Renewable Energy Zones, Phase 1: QRA

  7. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    PV Equal Solar Finance Solar Cost Low Cost Solar Thermal LowTech. Equal Solar Finance Solar Cost Low Cost Sol Thrm WindSensitivity Solar Tech. Solar Cost Wind RECs Sol Thrm Wet no

  8. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    33% RE target in the solar cost reduction cases, compared toprocure solar in any of the solar cost reduction cases areprocures solar. Solar Technology and Cost Cases Using the

  9. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    Low Cost Fixed PV Low Cost Wind High Wind Integration Cost$5/MWh. Integration costs for PV and solar thermal withoutNo Fed. ITC or PTC Low Cost Fxd PV High Utilization Sol Thrm

  10. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    REC Short Line Fixed PV 30K Cost Relative to Base Case ($/REC Short Line Fixed PV 30K Cost Relative to Base Case ($/$5/MWh. Integration costs for PV and solar thermal without

  11. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    Tucson to shift to New Mexico wind and Las Vegas to shift toArizona solar to New Mexico wind, and increased procurements procurement of New Mexico wind and Las Vegas’s procurement

  12. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    portfolio in the 33% renewable energy cases. One of the mostThe renewable energy target, in this case, is abstractedincremental renewable energy added in this case is delivered

  13. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    portfolio in the 33% renewable energy cases presented in270% from the 12% renewable energy case to the 33% case, thein 33% renewable energy scenarios Sensitivity Cases The

  14. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    lbnl-1642e.pdf Bonneville Power Administration (BPA). 2009.Oregon: Bonneville Power Administration. www.bpa.gov/

  15. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    pdf. Bonneville Power Administration (BPA). 2009. 2010 BPAOregon: Bonneville Power Administration. www.bpa.gov/

  16. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    from Arizona solar to New Mexico wind, and increasedMexico Nevada Oregon Texas Utah Washington Wyoming Geothermal Biomass Hydro Wind SolarMexico Nevada Oregon Texas Utah Washington Wyoming Geothermal Biomass Hydro Wind Solar

  17. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    for deployment of solar thermal in the southwest UnitedGeothermal Wind Wet Cooled Solar Thermal with StorageWet Cooled Solar Thermal without Storage Dry Cooled Solar

  18. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    Abbreviations ADC AWEA B&V CAES CCGT CDEAC CPUC DOE E3 GAMSair energy storage (CAES) with a generation capacity

  19. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    geothermal, biomass, and hydropower). Finally, Olson etthe contributions of hydropower, biomass, and geothermal dothe contribution of hydropower, biomass, and geothermal

  20. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    consists of biomass and hydropower resources. The technologyBiomass, geothermal, and hydropower are found to represent acost of Washington (WA) hydropower under the competitive

  1. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    substation, and are derived from a simple levelized-cost-substation, the capacity factor of the renewable resource, and financing parameters—including the capital structure, cost

  2. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    economics of large-scale wind power in a carbon constrainedwith large amounts of wind power. Final Report, Phase oneModeling utility-scale wind power plants. Part 2: Capacity

  3. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    gas Gigawatt Independent power producer Investment taxbe financed with independent power producer (IPP) financing

  4. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    on the costs and impacts of intermittent generation on theunadjusted) delivered cost as the generation (or bus-barcapital and operating cost of the generation facility, the

  5. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    solar thermal technology without thermal storage and the fixed-plate PV technologiesof fixed PV relative to wet-cooled solar thermal technology

  6. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    uncertainty of wind energy and solar technologies that lackthan wind energy, depending on the solar technology used,wind energy, at least when relying on the WREZ starting point assumptions for the cost and performance of various renewable technologies.

  7. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    profiles for wind energy and solar technologies withoutuncertainty of wind energy and solar technologies that lackof Wind and Solar Technology with Conventional Energy

  8. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    on Concentrating Solar Power Market Penetration. Las Vegas,the relatively higher market value of solar compared to windfind that the market value of solar, which is considerably

  9. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    on Concentrating Solar Power Market Penetration. Las Vegas,S. 2008. The Market Value and Cost of Solar PhotovoltaicSolar Power and Utility-Scale Photovoltaics into Regional Electricity Markets.

  10. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    Renewable Energy Laboratory. NREL/SR- 550-47078. http://Energy Laboratory. NREL/SR-6A2-46877. www.nrel.gov/Miller (PG&E), David Hurlbut (NREL), Lynn Coles (NREL), and

  11. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    reduction in average renewable energy costs WECC-wide byscenarios on renewable energy supply costs and transmissiondifferent renewable energy procurement, technology cost,

  12. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    Hild. 2004. “The Value of Wind Energy as a Function of Wind2: Capacity credit. ” Wind Energy 3(4): 167–206. Milligan,Energy (DOE). 2008. 20% Wind Energy by 2030: Increasing Wind

  13. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    33% RE Renewable Energy (TWh/yr) Wind Solar Hydro Biomass$/MWh) Energy- Weighted Median (10th; 90th Percentile) Hydroenergy. Load-sited CCGT (Sacramento) Geothermal Biomass Hydro

  14. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    by economic factors. Hydro Energy From Each Resource (TWh/model TOD Energy Factor Technology Hydro Biomass Geothermal33% RE Renewable Energy (TWh/yr) Wind Solar Hydro Biom as s

  15. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    M. Taylor. 2008. Photovoltaic Capacity Valuation Methods.of photovoltaic power generation on required capacity for

  16. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    procures solar. Solar Technology and Cost Cases Using theconstraints. Solar Technology and Cost Cases The three solarBase case. Solar Technology and Cost Cases The three solar

  17. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    Cooled Solar Thermal with Storage Fixed PV TOD Energy Valueof wind energy and solar technologies that lack thermalEnergy- Weighted Median (10th; 90th Percentile) Hydro Biomass Geothermal Wind Wet Cooled Solar Thermal

  18. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    a small margin only when solar thermal energy is assumed todelivered cost of solar thermal energy. Wind energy, on thecreate a simple “energy-balance” type solar thermal dispatch

  19. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01

    Thermal, Dry Cooling with Storage Solar Thermal, Wet Coolingas wind and solar without thermal storage—are added to theWind Wet Cooled Solar Thermal with Storage Wet Cooled Solar

  20. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    more valuable than solar without storage. not appear topenetration of solar without storage cannot be as readilypenetration of solar without storage, the marginal capacity