Powered by Deep Web Technologies
Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

GRR/Section 8 - Transmission Overview | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 8 - Transmission Overview GRR/Section 8 - Transmission Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8 - Transmission Overview 08 - TransmissionOverview.pdf Click to View Fullscreen Contact Agencies Federal Energy Regulatory Commission Regulations & Policies FERC Order No. 2003 FERC Order No. 2006 Triggers None specified Click "Edit With Form" above to add content 08 - TransmissionOverview.pdf 08 - TransmissionOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The siting of an individual project can have a major impact on transmission and interconnection. 8.1 - Will the Power Plant Developer Negotiate an Interconnection

2

Colorado/Transmission/Regulatory Overview | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Regulatory Overview < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission Regulatory Overview Roadmap State Data Regulatory Overview General Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution.

3

EIA - Annual Energy Outlook 2008 - Overview Section  

Gasoline and Diesel Fuel Update (EIA)

Overview Overview Annual Energy Outlook 2008 with Projections to 2030 Energy Trends to 2030 In preparing projections for the Annual Energy Outlook 2008 (AEO2008), the Energy Information Administration (EIA) evaluated a wide range of trends and issues that could have major implications for U.S. energy markets between today and 2030. This overview focuses on one case, the reference case, which is presented and compared with the Annual Energy Outlook 2007 (AEO2007) reference case (see Table 1). Readers are encouraged to review the full range of alternative cases included in other sections of AEO2008. As in previous editions of the Annual Energy Outlook (AEO), the reference case assumes that current policies affecting the energy sector remain unchanged throughout the projection period. The reference case provides a clear basis against which alternative cases and policies can be compared. Although current laws and regulations may change over the next 25 years, and new ones may be created, it is not possible to predict what they will be or how they will be implemented [1].

4

DOE EAC Electricity Adequacy Report. Transmission Section - September 15,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Section - Transmission Section - September 15, 2008 DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 There is a critical need to upgrade the nation's electric transmission grid. Two reasons in particular drive this need. First, increasing transmission capability will help ensure a reliable electric supply and provide greater access to economically-priced power. Second, with the growth in state-adopted renewable performance standards (RPS) and the increasing possibility of a national RPS, significant new transmission, much of it interregional, is needed to access renewable resources. DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 More Documents & Publications DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT-

5

Category:Regulatory Roadmap Overview Sections | Open Energy Information  

Open Energy Info (EERE)

Sections Sections Jump to: navigation, search GRR-logo.png Looking for the Geothermal Regulatory Roadmap? Click here for a user-friendly list of Geothermal Regulatory Roadmap pages. This is the Regulatory Roadmap Overview Sections category. Add.png Add an Section Pages in category "Regulatory Roadmap Overview Sections" The following 22 pages are in this category, out of 22 total. G GRR/Section 1 - Land Use Overview GRR/Section 10 - On-Site Evaluation Process GRR/Section 11 - Cultural Resource Assessment GRR/Section 12 - Flora & Fauna Resource Assessment Process GRR/Section 13 - Land Use Assessment Process GRR/Section 14 - Water Resource Assessment GRR/Section 15 - Air Quality Assessment Process GRR/Section 16 - Geological Resources Assessment Process G cont.

6

GRR/Section 5 - Drilling Overview | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 5 - Drilling Overview GRR/Section 5 - Drilling Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 5 - Drilling Overview 05DrillingPermittingOverview.pdf Click to View Fullscreen Contact Agencies BLM Regulations & Policies 30 USC § 1001 Triggers None specified On top of acquiring the correct drilling permits a developer needs to consider issues such as land and mineral ownership and right of way access. 05DrillingPermittingOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 5.1 - Review Potential Construction Permits In addition to drilling permits, the developer may require other

7

GRR/Section 9 - Environmental Overview | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 9 - Environmental Overview GRR/Section 9 - Environmental Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9 - Environmental Overview 09EnvironmentalOverview.pdf Click to View Fullscreen Contact Agencies United States Environmental Protection Agency BLM United States Forest Service DOE United States Department of Defense Regulations & Policies National Environmental Policy Act 40 CFR 1508.18 Major Federal Action Triggers None specified Click "Edit With Form" above to add content 09EnvironmentalOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The National Environmental Policy Act (NEPA) was signed into law on January

8

GRR/Section 6 - Construction Permits Overview | Open Energy Information  

Open Energy Info (EERE)

6 - Construction Permits Overview 6 - Construction Permits Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6 - Construction Permits Overview 06 - ConstructionPermitsOverview.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 06 - ConstructionPermitsOverview.pdf 06 - ConstructionPermitsOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Constructing a geothermal power plant requires numerous permits from Federal, state, and local governments, related to transporting construction materials, encroaching upon Federal and state right-of-ways, demolishing existing structures and building new structures.

9

File:08 - TransmissionOverview.pdf | Open Energy Information  

Open Energy Info (EERE)

TransmissionOverview.pdf TransmissionOverview.pdf Jump to: navigation, search File File history File usage Metadata File:08 - TransmissionOverview.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 65 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:20, 1 August 2013 Thumbnail for version as of 12:20, 1 August 2013 1,275 × 1,650, 2 pages (65 KB) Apalazzo (Talk | contribs) 15:43, 1 July 2013 Thumbnail for version as of 15:43, 1 July 2013 1,275 × 1,650, 2 pages (65 KB) Apalazzo (Talk | contribs) 17:37, 16 January 2013 Thumbnail for version as of 17:37, 16 January 2013 1,275 × 1,650, 2 pages (66 KB) Dfitzger (Talk | contribs)

10

GRR/Section 4 - Exploration Overview | Open Energy Information  

Open Energy Info (EERE)

4 - Exploration Overview 4 - Exploration Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4 - Exploration Overview 04ExplorationPermittingOverview (3).pdf Click to View Fullscreen Contact Agencies BLM United States Forest Service Regulations & Policies 30 USC § 1001 Triggers None specified Click "Edit With Form" above to add content 04ExplorationPermittingOverview (3).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The exploration process requires consideration of right of way access, geothermal leasing, and state and federal exploration permits. 4.1 and 4.2 - Will the Developer Engage in Coproduction on an Existing

11

GRR/Section 20 - Plant Decommissioning Overview | Open Energy Information  

Open Energy Info (EERE)

20 - Plant Decommissioning Overview 20 - Plant Decommissioning Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 20 - Plant Decommissioning Overview 20PlantDecommissioningOverview (1).pdf Click to View Fullscreen Contact Agencies BLM Regulations & Policies 43 CFR 3263.10-3263.15: Well Abandonment Geothermal Resources Operational Order No.3 Triggers None specified Click "Edit With Form" above to add content 20PlantDecommissioningOverview (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative State and federal laws have specific requirements for the decommissioning process. 20.1 to 20.2 - Will a Geothermal Well be Abandoned?

12

GRR/Section 1 - Land Use Overview | Open Energy Information  

Open Energy Info (EERE)

1 - Land Use Overview 1 - Land Use Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 1 - Land Use Overview 01LandUseOverview.pdf Click to View Fullscreen Contact Agencies Bureau of Land Management U S Army Corps of Engineers United States Environmental Protection Agency Fish and Wildlife Service United States Department of Defense Regulations & Policies Federal Land Policy and Management Act of 1976 Endangered Species Act Clean Water Act Clean Air Act Farmland Protection Policy Act Sikes Act National Historic Preservation Act (NHPA) - specifically, Section 106 Native American Graves Protection Act Archaeological Resource Protection Act Triggers None specified Click "Edit With Form" above to add content

13

Overview of recent U235 neutron cross section evaluation work  

Science Conference Proceedings (OSTI)

This report is an overview (through 1997) of the U235 neutron cross section evaluation work at Oak Ridge National Laboratory (ORNL), AEA Technology (Harwell) and Lockheed Martin Corp.-Schenectady (LMS), which has influenced, or appeared in, ENDF/B-VI through Release 5. The discussion is restricted to the thermal and resolved resonance regions, apart from some questions about the unresolved region which still need investigation. The important role which benchmark testing has played will be touched on.

Lubitz, C. [Lockheed Martin Corp., Schenectady, NY (United States)

1998-10-01T23:59:59.000Z

14

Transmission and distribution technologies: Program overview, FY 1993--FY 1994  

SciTech Connect

Electricity is the lifeblood of our Nation`s economy and a critical contributor to our standard of living. For decades, increases in the gross domestic product (GDP) have been accompanied by increases in electricity use. This overview provides the reader with an introduction to the US Department of Energy`s (DOE`s) T&D Technologies Program. It shows how the program is meeting the challenges being imposed on the T&D infrastructure by the changing electric power industry and how the Nation will benefit from its efforts. The overview describes the program`s ongoing projects and discusses the new projects being initiated in fiscal year (FY) 1995.

1995-06-01T23:59:59.000Z

15

Electricity transmission: an overview of the current debate  

E-Print Network (OSTI)

, FERC, pursued the implementation of a Standard Market Design and encouraging larger Regional Transmission Organisations to facilitate efficient trade over wider areas and transmission investment. In Europe, under prompting from the European... will soon be) implemented in some variation in several states in the US (e.g. PJM, New York, New England, Texas and California) and is a cornerstone of FERCs proposed Standard Market Design. For short-run congestion management there is agreement that a...

Brunekreeft, Gert; Neuhoff, Karsten; Newbery, David

2006-03-14T23:59:59.000Z

16

GRR/Section 19-TX-a - Water Access and Water Issues Overview | Open Energy  

Open Energy Info (EERE)

9-TX-a - Water Access and Water Issues Overview 9-TX-a - Water Access and Water Issues Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-TX-a - Water Access and Water Issues Overview 19TXAWaterAccessAndWaterRightsIssuesOverview.pdf Click to View Fullscreen Contact Agencies Texas Commission on Environmental Quality Regulations & Policies Tex. Water Code § 11 Triggers None specified Click "Edit With Form" above to add content 19TXAWaterAccessAndWaterRightsIssuesOverview.pdf 19TXAWaterAccessAndWaterRightsIssuesOverview.pdf 19TXAWaterAccessAndWaterRightsIssuesOverview.pdf 19TXAWaterAccessAndWaterRightsIssuesOverview.pdf Flowchart Narrative In the late 1960's Texas transitioned its water law system, switching

17

GRR/Section 6-MT-d - Other Overview | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 6-MT-d - Other Overview GRR/Section 6-MT-d - Other Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-MT-d - Other Overview 06MTDOtherOverview.pdf Click to View Fullscreen Contact Agencies Montana Department of Natural Resources & Conservation Montana Department of Environmental Quality Montana Fish, Wildlife & Parks Triggers None specified Click "Edit With Form" above to add content 06MTDOtherOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This overview is intended to direct the developer to additional construction permits. For projects intended near waterways, Montana also provides a joint

18

EIA - Annual Energy Outlook 2008 - Overview Section Notes  

Annual Energy Outlook 2012 (EIA)

Chapters pdf image Overview pdf image Market Trends in Economic Activity pdf image Energy Demand Projections pdf image Electricity Forecast pdf image Oil and Natural Gas...

19

GRR/Section 6-HI-d - Other Overview | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » GRR/Section 6-HI-d - Other Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-HI-d - Other Overview 06HIDOtherOverview.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 06HIDOtherOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Add Text Print PDF Retrieved from "http://en.openei.org/w/index.php?title=GRR/Section_6-HI-d_-_Other_Overview&oldid=685852"

20

GRR/Section 11-CO-a - State Cultural Considerations Overview | Open Energy  

Open Energy Info (EERE)

GRR/Section 11-CO-a - State Cultural Considerations Overview GRR/Section 11-CO-a - State Cultural Considerations Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-CO-a - State Cultural Considerations Overview 11COAStateCulturalConsiderationsOverview.pdf Click to View Fullscreen Contact Agencies Colorado Office of Archaeology and Historic Preservation Regulations & Policies CRS 24-80-1301, et seq. Triggers None specified Click "Edit With Form" above to add content 11COAStateCulturalConsiderationsOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 11-CO-a.1 - Have Potential Human Remains Been Discovered?

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

GRR/Section 11-TX-a - State Cultural Considerations Overview | Open Energy  

Open Energy Info (EERE)

GRR/Section 11-TX-a - State Cultural Considerations Overview GRR/Section 11-TX-a - State Cultural Considerations Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-TX-a - State Cultural Considerations Overview 11TXAStateCulturalConsiderationsOverview.pdf Click to View Fullscreen Contact Agencies Texas Historical Commission Regulations & Policies NRC Ch. 191: Antiquities Code CCP Ch. 49: Inquests Upon Dead Bodies Triggers None specified Click "Edit With Form" above to add content 11TXAStateCulturalConsiderationsOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 11-TX-a.1 - Have Potential Human Remains Been Discovered?

22

GRR/Section 3-WA-b - Land Access Overview | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-b - Land Access Overview GRR/Section 3-WA-b - Land Access Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-b - Land Access Overview 3-WA-b - Land Access Overview.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Triggers None specified Any developer that needs access to or through state lands must obtain the appropriate permit or lease. The developer will obtain such permit or lease through the Washington State Department of Natural Resources. 3-WA-b - Land Access Overview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

23

GRR/Section 3-UT-c - State Encroachment Overview | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-UT-c - State Encroachment Overview GRR/Section 3-UT-c - State Encroachment Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-UT-c - State Encroachment Overview 03UTCStateEncroachmentOverview.pdf Click to View Fullscreen Contact Agencies Utah Department of Transportation Triggers None specified Click "Edit With Form" above to add content 03UTCStateEncroachmentOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Utah Department of Transportation's Region Permits Offices protect the State's right-of-way and facilitate and coordinate other highway users and provide for safe and efficient operation of Utah's highways. The

24

GRR/Section 7 - Power Plant Siting, Construction, and Regulation Overview |  

Open Energy Info (EERE)

GRR/Section 7 - Power Plant Siting, Construction, and Regulation Overview GRR/Section 7 - Power Plant Siting, Construction, and Regulation Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7 - Power Plant Siting, Construction, and Regulation Overview 07PowerPlantSitingConstructionOverview (2).pdf Click to View Fullscreen Contact Agencies Federal Energy Regulatory Commission Triggers None specified Click "Edit With Form" above to add content 07PowerPlantSitingConstructionOverview (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The power plant's location, size, type of customer the power plant sells energy to, and whether the power plant sells energy in "interstate

25

GRR/Section 3 - Land Access Process Overview | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3 - Land Access Process Overview GRR/Section 3 - Land Access Process Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3 - Land Access Process Overview 03LandAccessOverview (4).pdf Click to View Fullscreen Contact Agencies Bureau of Land Management United States Forest Service Bureau of Indian Affairs Fish and Wildlife Service Bureau of Reclamation United States Department of Energy United States Department of Defense Regulations & Policies National Environmental Policy Act (NEPA) Energy Policy Act of 2005 (EPAct) Energy Policy Act, Section 1835 - Split Estate Geothermal Steam Act of 1970 Federal Geothermal Leasing - 2007 Rules (43 CFR Part 3200) 43 C.F.R. 3203 Competitive Leasing 43 C.F.R. 3104 Performance Bond

26

GRR/Section 19-CO-a - Water Access and Water Rights Issues Overview | Open  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 19-CO-a - Water Access and Water Rights Issues Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-CO-a - Water Access and Water Rights Issues Overview 19COAWaterAccessAndWaterRightsIssuesOverview.pdf Click to View Fullscreen Contact Agencies Colorado Division of Water Resources Colorado Ground Water Commission Triggers None specified Click "Edit With Form" above to add content 19COAWaterAccessAndWaterRightsIssuesOverview.pdf 19COAWaterAccessAndWaterRightsIssuesOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

27

GRR/Section 3-MT-c - Encroachment Overview | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 3-MT-c - Encroachment Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-MT-c - Encroachment Overview 03MTCEncroachmentOverview.pdf Click to View Fullscreen Contact Agencies Montana Department of Natural Resources & Conservation Triggers None specified Click "Edit With Form" above to add content 03MTCEncroachmentOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative There are several individual right of way or encroachment procedures in Montana. This overview is intended to lead the developer to the appropriate

28

GRR/Section 11-WA-a - State Cultural Considerations Overview | Open Energy  

Open Energy Info (EERE)

GRR/Section 11-WA-a - State Cultural Considerations Overview GRR/Section 11-WA-a - State Cultural Considerations Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-WA-a - State Cultural Considerations Overview 11-WA-a - State Cultural Considerations Overview.pdf Click to View Fullscreen Triggers None specified The developer will be required to comply with Washington state law when human remains or other cultural resources are discovered on a project site. Cultural resources include both historic and archaeological resources and sites. The discovery of cultural resources may require obtaining a permit and providing public notice and notice to Indian Tribes. Once the necessary procedures have been followed, the developer may continue with the project.

29

GRR/Section 19 - Water Access & Water Rights Overview | Open Energy  

Open Energy Info (EERE)

- Water Access & Water Rights Overview - Water Access & Water Rights Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19 - Water Access & Water Rights Overview 19WaterAccessWaterRightsOverview.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 19WaterAccessWaterRightsOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer may require water for such uses as dust suppression for roads, construction activities, drilling operations, extraction of geothermal resources, plant cooling operations, etc. Water access and water rights are predominantly handled by state law.

30

GRR/Section 3-CO-c - Encroachment Overview | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » GRR/Section 3-CO-c - Encroachment Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-CO-c - Encroachment Overview 03COCEncroachmentOverview.pdf Click to View Fullscreen Contact Agencies Colorado Department of Transportation Regulations & Policies Rule 2.2.1.1 Triggers None specified Click "Edit With Form" above to add content 03COCEncroachmentOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

31

GRR/Section 19-WA-a - Water Access and Water Rights Overview | Open Energy  

Open Energy Info (EERE)

9-WA-a - Water Access and Water Rights Overview 9-WA-a - Water Access and Water Rights Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-a - Water Access and Water Rights Overview 19-WA-a - Water Access and Water Rights Overview.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington Chapter 90.03 Revised Code of Washington Chapter 90.44 RCW 90.44.050 Triggers None specified Similar to many western states, only a small amount of water is available for appropriation in Washington. As a result, Washington has developed a comprehensive regulatory scheme for the distribution of water rights and use of water in the state. Washington employs a prior appropriation or

32

GRR/Section 9-WA-a - State Environmental Overview | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 9-WA-a - State Environmental Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-WA-a - State Environmental Overview 9-WA-a - State Environmental Overview.pdf Click to View Fullscreen Triggers None specified The Washington State Environmental Policy Act (SEPA), chapter 43.21 RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. Washington uses an Environmental Checklist and Environmental Review (ER) to provide information to help government agencies identify impacts from their proposals and determine whether an Environmental Impact Statement (EIS) is necessary.

33

GRR/Section 8-TX-a - Transmission Siting | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 8-TX-a - Transmission Siting GRR/Section 8-TX-a - Transmission Siting < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-TX-a - Transmission Siting 08TXATransmissionSiting.pdf Click to View Fullscreen Contact Agencies Public Utility Commission of Texas Regulations & Policies PUCT Substantive 25.83: Transmission Construction Reports PUCT Substantive Rule 25.101: Certification Criteria Triggers None specified Click "Edit With Form" above to add content 08TXATransmissionSiting.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Transmission siting is handled by the Public Utility Commission of Texas

34

GRR/Section 8-UT-a - State Transmission Siting | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 8-UT-a - State Transmission Siting GRR/Section 8-UT-a - State Transmission Siting < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-UT-a - State Transmission Siting 08UTAStateTransmissionSitingProcess.pdf Click to View Fullscreen Contact Agencies Federal Energy Regulatory Commission Utah Public Service Commission Regulations & Policies Utah Code Title 54 - Public Utilities Siting of High Voltage Power Line Act Utah Code 10-9a-508 Triggers None specified Click "Edit With Form" above to add content 08UTAStateTransmissionSitingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

35

GRR/Section 8-CA-a - State Transmission | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 8-CA-a - State Transmission GRR/Section 8-CA-a - State Transmission < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-CA-a - State Transmission 08CAACaliforniaTransmission.pdf Click to View Fullscreen Contact Agencies California Energy Commission Regulations & Policies CPUC General Order (G.O) 131-D Triggers None specified Click "Edit With Form" above to add content 08CAACaliforniaTransmission.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 8-CA-a.1 to 8-CA-a.2 - Is the Planned Geothermal Plant Capacity Greater than 50 MW The California Energy Commission (CEC) has the statutory responsibility for

36

Overview  

E-Print Network (OSTI)

Per the guidance in the August 25 memorandum, this update highlights the U.S. Nuclear Regulatory Commissions (NRCs) overall accomplishments in implementing the E-Government Act and discusses the Agencywide Documents Access and Management System (ADAMS), the NRCs document and records management system, as an example of an internal agencyspecific E-Government (E-Gov) initiative. Sections 2 and 3 of this update address the agencys process for determining which information should be made available on the NRCs public Web site and how information dissemination activities are coordinated with NRCs Freedom of Information Act (FOIA) operations. Section 1 Provide a brief overview of your agencys implementation of the Act, including a description of an internal agency-specific E-Government initiative. 1.a. Provide a brief overview of your agencys implementation of the Act. This section highlights the NRCs progress in implementing the E-Government Act under the following headings:

unknown authors

2006-01-01T23:59:59.000Z

37

GRR/Section 8-ID-a - State Transmission | Open Energy Information  

Open Energy Info (EERE)

8-ID-a - State Transmission 8-ID-a - State Transmission < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-ID-a - State Transmission 08IDAStateTransmission.pdf Click to View Fullscreen Contact Agencies Idaho Public Utilities Commission Regulations & Policies IC §67-6508: Local Land Use Planning Duties IC §61-526: Certificate of Public Convenience and Necessity Triggers None specified Click "Edit With Form" above to add content 08IDAStateTransmission.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 8-ID-a.1 - Will the Transmission Project Be Undertaken by a Public Utility?

38

GRR/Section 8-HI-a - Transmission Line Approval | Open Energy Information  

Open Energy Info (EERE)

8-HI-a - Transmission Line Approval 8-HI-a - Transmission Line Approval < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-HI-a - Transmission Line Approval 08HIATransmissionLineApproval.pdf Click to View Fullscreen Contact Agencies Hawaii Public Utilities Commission Triggers None specified Click "Edit With Form" above to add content 08HIATransmissionLineApproval.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer must obtain Transmission Line Approval from the Hawaii Public Utilities Commission (PUC) to interconnect a proposed renewable energy project to the existing grid, when new transmission lines are required.

39

GRR/Section 8-OR-a - State Transmission Siting | Open Energy Information  

Open Energy Info (EERE)

8-OR-a - State Transmission Siting 8-OR-a - State Transmission Siting < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-OR-a - State Transmission Siting 08ORAStateTransmissionSitingProcess (1).pdf Click to View Fullscreen Contact Agencies Oregon Department of Energy Oregon Energy Facility Siting Council Regulations & Policies ORS 469: Energy and Conservation OAR 345-015: Department of Energy Proceedings OAR 345-023: Need Standard OAR 345-024: Specific Standards for Siting Facilities Triggers None specified Click "Edit With Form" above to add content 08ORAStateTransmissionSitingProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

40

Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-------------------------Chapter 7.3 (September, 2013) ACQUISITION PLANNING IN THE M&O ENVIRONMENT Overview The purpose of this chapter is to discuss the unique acquisition planning and approval requirements associated with the Management and Operating (M&O) form of contract. References 1. FAR Part 7 Acquisition Planning 2. FAR Subpart 17.6 Management and Operating Contracts 3. DEAR 970.1706 Management and Operating Contracts 4. DOE Acquisition Guide, Chapter 7.1 Acquisition Planning 5. DOE Acquisition Guide, Chapter 71.1 Headquarters Business Clearance Process Background Subpart 17.6 of the FAR prescribes policies and procedures for the award, renewal, and extension of M&O contracts. Section 17.602 permits Heads of Agencies to award and renew

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

GRR/Section 8-AK-a - Transmission | Open Energy Information  

Open Energy Info (EERE)

8-AK-a - Transmission 8-AK-a - Transmission < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-AK-a - Transmission 08AKATransmission.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 08AKATransmission.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Under the Alaska Public Utilities Regulatory Act, transmission is included in Alaska's regulation of public utilities. According to AS 42.05.990(5), "public utility" or "utility" includes every corporation whether public, cooperative, or otherwise, company, individual, or association of

42

GRR/Section 8-MT-a - Transmission Siting Process | Open Energy Information  

Open Energy Info (EERE)

8-MT-a - Transmission Siting Process 8-MT-a - Transmission Siting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-MT-a - Transmission Siting Process 08MTATransmission (3).pdf Click to View Fullscreen Contact Agencies Montana Department of Environmental Quality Regulations & Policies Montana Code Annotated Title 75, Chapter 20 Montana Environmental Policy Act MCA 75-20-301 Findings Necessary for Certification ARM 17.20.1606 Electric Transmission Lines, Need Standard ARM 17.20.907 ARM 17.20.920 ARM 17.20.921 ARM 17.20.923 ARM 17.20.1902 Triggers None specified Click "Edit With Form" above to add content 08MTATransmission (3).pdf 08MTATransmission (3).pdf Error creating thumbnail: Page number not in range.

43

Overview  

Science Conference Proceedings (OSTI)

Overview. A, B, C. 1, Validation, Tab, Note. 2, Codes and other facets must have definitions. FacetBlankDefs, Fixed and added ...

2013-07-08T23:59:59.000Z

44

> PAPER FOR THE SPECIAL SECTION ON TRANSMISSION INVESTMENT, PRICING AND CONSTRUCTION < 1 Abstract--From an economic perspective, the appropriate  

E-Print Network (OSTI)

the impacts of an electricity transmission project on different players may vary, such side payments a multi-stage game-theoretic framework for electricity transmission investment as a new planning paradigm> PAPER FOR THE SPECIAL SECTION ON TRANSMISSION INVESTMENT, PRICING AND CONSTRUCTION

45

Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overview Overview The mission of the Department of Energy is to ensure America's security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. A cornerstone of technology leadership and its accompanying jobs is a vibrant science and technology enterprise. To achieve this, the Department needs to cultivate the entire technology innovation chain, from enabling discoveries to research, development, demonstration, and deployment. The Department must create the conditions today that will harness the next generation of scientists and engineers to support its mission, administer its programs, and conduct the research that will support energy economic development and realize the nation's science, technology, and

46

GRR/Section 7 - Power Plant Siting/Construction Overview | Open...  

Open Energy Info (EERE)

with form History Share this page on Facebook icon Twitter icon GRRSection 7 - Power Plant SitingConstruction Overview < GRR Jump to: navigation, search GRR-logo.png...

47

Overview  

Gasoline and Diesel Fuel Update (EIA)

8 8 First Quarter 2008 Key Findings Net Income $28.3 billion Revenues $343.4 billion Highlights Major energy companies reported an 18-percent increase in net income relative to first quarter of 2007 (42-percent increase relative to the first-quarter average for 2003- 2007). Return on sales (net income ÷ revenue) fell from 9.5 percent in the first quarter of 2007 to 8.2 percent in the first quarter of 2008 due to the 37 percent increase in revenue. The effects of higher oil and natural gas prices overwhelm lower worldwide oil production and U.S. refining margins. Overview Nineteen major energy companies [1] reported overall net income (excluding unusual items) of $28.3 billion on revenues of $343.4 billion during the first quarter of 2008 (Q108). The level of net income for Q108 was 18-

48

Overview  

Gasoline and Diesel Fuel Update (EIA)

7 7 Third Quarter 2007 Key Findings Net Income $26.5 billion Revenues $301.8 billion Highlights 11-percent decrease in net income relative to third quarter of 2006 (25-percent increase relative to the third-quarter average for 2003-2006) effects of higher oil prices overwhelmed by lower worldwide oil production and U.S. refining margins Overview Twenty-two major energy companies 1 reported overall net income (excluding unusual items) of $26.5 billion on revenues of $301.8 billion during the third quarter of 2007 (Q307). The level of net income for Q307 was 11- percent lower than in the third quarter of 2006 (Q306) (Table 1), but was 25-percent higher than the third-quarter average for 2003-2006 after adjusting for price changes. Net income for Q307 decreased as the effects of lower

49

Overview  

Gasoline and Diesel Fuel Update (EIA)

8 8 Second Quarter 2008 Key Findings Net Income $30.4 billion Revenues $423.4 billion Highlights Major energy companies reported a 1-percent decline in net income relative to second quarter of 2007. However, this also represents a 31-percent increase relative to the second-quarter average for 2003-2007. Return on sales (net income ÷ revenue) fell from 10.5 percent in the second quarter of 2007 to 7.2 percent in the second quarter of 2008 due to the 44 percent increase in revenue. The effects of higher oil and natural gas prices overwhelm lower worldwide oil production and world-wide refining margins. Overview Nineteen major energy companies [1] reported overall net income (excluding unusual items) of $30.4 billion on revenues of $423.4 billion during the second quarter of 2008 (Q208). The level of net income for Q208 was 1-

50

Overview  

Gasoline and Diesel Fuel Update (EIA)

Companies, First Quarter 2007 Companies, First Quarter 2007 Overview First Quarter 2007 Key Findings Net Income $23.9 billion Revenues $261.2 billion Trends Unchanged net income relative to first quarter of 2006 Lower oil and gas prices, higher oil and gas production Twenty major energy companies reported overall net income (excluding unusual items) of $23.9 billion on revenues of $261.2 billion during the first quarter of 2007 (Q107). The level of net income for Q107 was essentially unchanged relative to the first quarter of 2006 (Q106) (Table 1). Net income for Q107 was unchanged as the effects of lower prices were offset by the effects of higher worldwide production of crude oil and natural gas liquids, and increased domestic production of natural gas. Overall, the petroleum line of business (which includes both oil and natural gas production and

51

Overview  

Gasoline and Diesel Fuel Update (EIA)

2007 Overview Second Quarter 2007 Key Findings Net Income $30.7 billion Revenues $301.7 billion Trends 4-percent increase in net income relative to second quarter of 2006 Lower oil prices, and lower oil and gas production Twenty-two major energy companies a reported overall net income (excluding unusual items) of $30.7 billion on revenues of $301.7 billion during the second quarter of 2007 (Q207). The level of net income for Q207 was 4-percent higher than in the second quarter of 2006 (Q206) (Table 1). Net income for Q207 increased as the effects of higher natural gas prices and much higher refining margins offset the effects of lower oil prices, lower worldwide production of oil and natural gas, and lower refinery throughput. Overall, the petroleum line of business (which includes both oil and natural gas production and

52

Overview  

Gasoline and Diesel Fuel Update (EIA)

7 7 Fourth Quarter 2007 Key Findings Net Income $28.3 billion Revenues $329.6 billion Highlights 24-percent increase in net income relative to fourth quarter of 2006 (31-percent increase relative to the fourth-quarter average for 2003-2006) effects of higher oil and natural gas prices overwhelm lower worldwide oil production and U.S. refining margins Overview Sixteen major energy companies [1] reported overall net income (excluding unusual items) of $28.3 billion on revenues of $329.6 billion during the fourth quarter of 2007 (Q407). The level of net income for Q407 was 24- percent higher than in the fourth quarter of 2006 (Q406) (Table 1), and was 31-percent higher than the fourth- quarter average for 2003-2006 after adjusting for inflation. Net income for Q407 increased as the effects of lower

53

GRR/Section 8-NV-a - Transmission | Open Energy Information  

Open Energy Info (EERE)

of wastewater, which support or service an electric generating plant. 2. Electric transmission lines and transmission substations that: (a) Are designed to operate at 200...

54

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

55

GRR/Section 8-CO-a - State Transmission | Open Energy Information  

Open Energy Info (EERE)

Will the Transmission Encroach on a State Highway ROW? If the developer intends to build transmission lines that encroach on state highway rights-of-way, it will need to acquire a...

56

Transmission of information and synchronization in a pair of coupled chaotic circuits: an experimental overview  

E-Print Network (OSTI)

We propose a rationale for experimentally studying the intricate relationship between the rate of information transmission and synchronization level in active networks, applying theoretical results recently proposed. We consider two non-identical coupled Chua's circuit with non-identical coupling strengths in order to illustrate the proceeding for experimental scenarios of very few data points coming from highly non-coherent coupled systems, such that phase synchronization can only be detected by methods that do not rely explicitely on the calculation of the phase. A relevant finding is to show that for the coupled Chua's circuit, the larger the level of synchronization the larger the rate of information exchanged between both circuits. We further validate our findings with data from numerical simulations, and discuss an extension to arbitrarily large active networks.

M. S. Baptista; S. P. Garcia; S. K. Dana; J. Kurths

2008-02-21T23:59:59.000Z

57

Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S-1 Summary This summary covers the major points of the draft environmental impact statement (DEIS) prepared for the Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project (Libby-Troy Project). This DEIS was prepared by Bonneville Power Administration (BPA). The project would include rebuilding a 17-mile section of an existing BPA transmission line located between Libby and Troy, Montana. S.1 Purpose of and Need for Action Historically, BPA has served electrical loads in northwestern Montana and northern Idaho with transmission facilities from Libby Dam east of Libby, Montana through Bonners Ferry Substation west of Bonners Ferry, Idaho to Albeni Falls Dam near the Idaho-Washington border (Figure S-1). These

58

An Energy Overview of Croatia  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Croatia. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-17T23:59:59.000Z

59

An Energy Overview of Argentina  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Argentina. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-20T23:59:59.000Z

60

An Energy Overview of Romania  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Romania. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-20T23:59:59.000Z

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

An Energy Overview of Slovenia  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Slovenia. The site is designed to be dynamic. Updates to the overviews will be made as need and resource s permit.

anon.

2003-10-20T23:59:59.000Z

62

An Energy Overview of Peru  

SciTech Connect

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Peru. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-20T23:59:59.000Z

63

An Energy Overview of Venezuela  

Science Conference Proceedings (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Venezuela. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-20T23:59:59.000Z

64

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROPOSAL PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge ....................................................................................................................................... 1 2. The Solution .......................................................................................................................................... 1 SECTION I: STATUTORY CRITERIA 1. General Description of the Entity ................................................................................................... 4 2. Project Description ............................................................................................................................. 5

65

Inspection and Assessment of Overhead Transmission Line Hardware, Conductors and Shield Wires: Technology Overview of Conductor Inspection Tools  

Science Conference Proceedings (OSTI)

This report summarizes in detail the theory and operation of technologies for the inspection of overhead transmission line conductors and evaluates their effectiveness. It covers existing technologies and technologies that are commercially available but have the promise of becoming effective screening and, in some cases, predictive tools in the future. Technologies described and assessed include:The Cormon overhead line corrosion detectorThe Cross-Checker ...

2013-12-22T23:59:59.000Z

66

An Energy Overview of Bolivia  

Science Conference Proceedings (OSTI)

The DOE Office of Fossil Energy maintained a web site that was meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consisted of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There were also more than 30 Country Energy Overviews at the web site -- each of these was a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Bolivia.

anon.

2003-08-13T23:59:59.000Z

67

Transmission Electron Microscope and Scanning Electron Microscopes -  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities > Transmission Electron Facilities > Transmission Electron Microscope and Scanning Electron Microscopes FACILITIES Transmission Electron Microscope and Scanning Electron Microscopes Overview Other Facilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Transmission Electron Microscope and Scanning Electron Microscopes The research activities of the Corrosion and Mechanics of Materials Section are supported by complete metallography/sample preparation rooms equipped with several optical and electron microscopes: a Transmission Electron Microscope and two Scanning Electron Microscopes. Bookmark and Share Transmission electron microscope (TEM) Detail of JEOL 100CXII TEM Figure 1: Detail of JEOL 100CXII TEM. Click on image to view larger image.

68

An Energy Overview of the Czech Republic  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is the Czech Republic. The site is designed to be dynamic. Updates to the overviews will be made as need an d resources permit.

anon.

2003-10-17T23:59:59.000Z

69

An Energy Overview of the Slovak Republic  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Slovakia. The site is designed to be dynamic. Updates to the overviews will be made as need and resource s permit.

anon.

2003-10-20T23:59:59.000Z

70

DOE Corporate Overview - 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy, 2012 Section One, page 1 U.S. Department of Energy, 2012 Section One, page 1 SECTION ONE INTRODUCTION TO THE DEPARTMENT OF ENERGY EXECUTIVE SUMMARY Welcome to the Department of Energy. This book provides an overview of the Department of Energy (DOE). The opening sections describe the mission areas, organizational structure and upcoming critical issues of the Department, followed by brief descriptions of DOE's goals and programs. Later sections provide overviews of the Department's budget, staffing, contract management, project management, Congressional jurisdiction, Government Accountability Office (GAO) and DOE's Inspector General (IG) oversight and DOE high-visibility

71

An Energy Overview of the Republic of Kyrgyzstan  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Kyrgyzstan. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-20T23:59:59.000Z

72

An Energy Overview of the Republic of Kazakhstan  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Kazakhstan. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-20T23:59:59.000Z

73

An Energy Overview of the Republic of Poland  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Poland. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-20T23:59:59.000Z

74

An Energy Overview of the Republic of Uzbekistan  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Uzbekistan. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-20T23:59:59.000Z

75

An Energy Overview of the Republic of Armenia  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Armenia. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-20T23:59:59.000Z

76

An Energy Overview of the Republic of Tajikistan  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Tajikistan. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-20T23:59:59.000Z

77

An Energy Overview of the Kingdom of Thailand  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Thailand. The site is designed to be dynamic. Updates to the overviews will be made as need and resource s permit.

anon.

2003-10-20T23:59:59.000Z

78

An Energy Overview of the Republic of Moldova  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Moldova. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-20T23:59:59.000Z

79

An Energy Overview of the Republic of Bulgaria  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Bulgaria. The site is designed to be dynamic. Updates to the overviews will be made as need and resource s permit.

anon.

2003-10-16T23:59:59.000Z

80

An Energy Overview of the Republic of Hungary  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Hungary. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-20T23:59:59.000Z

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

An Energy Overview of the Republic of Egypt  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Egypt. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-17T23:59:59.000Z

82

An Energy Overview of the Republic of Latvia  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Latvia. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-20T23:59:59.000Z

83

An Energy Overview of the Republic of Lithuania  

DOE Green Energy (OSTI)

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Lithuania. The site is designed to be dynamic. Updates to the overviews will be made as need and resources permit.

anon.

2003-10-20T23:59:59.000Z

84

An Energy Overview of the Kingdom of Thailand  

SciTech Connect

The DOE Office of Fossil Energy is maintaining a web site that is meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consists of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There are also more than 30 Country Energy Overviews at the web site -- each of these is a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Thailand. The site is designed to be dynamic. Updates to the overviews will be made as need and resource s permit.

anon.

2003-10-20T23:59:59.000Z

85

An Energy Overview of the Republic of Azerbaijan  

Science Conference Proceedings (OSTI)

The DOE Office of Fossil Energy had maintained a web site that was meant to provide useful business- and energy-related information about countries and regions of the world for exporters, project developers, and researchers. The site consisted of more than 130 country pages (organized into seven different world regions), with each country page having its own set of links to information sources about that country. There were also more than 30 Country Energy Overviews at the web site -- each of these was a comprehensive review of a specific country's entire energy situation, including sections on Energy Policy, Oil, Natural Gas, Coal, Hydroelectric/Renewables, Nuclear Power, Energy Transmission Infrastructure, Electricity, Electric Industry Overview, Environmental Activities, Privatization, Trade, and Economic Situation. The specific country highlighted in this Country Energy Overview is Azerbaijan.

anon.

2004-06-21T23:59:59.000Z

86

Duke Energy's Transmission Roadmap Initiative  

Science Conference Proceedings (OSTI)

Duke Energy's Transmission Roadmap Initiative advances a vision for development of a power delivery communications and automation infrastructure. The initiative describes performance of a communications upgrade to substations, implementation of select technologies and applications, and integration of enterprise applications, databases, and systems. This report provides a comprehensive view of Duke's Transmission Roadmap Initiative, with a complete technology assessment, infrastructure overview, and discu...

2009-09-18T23:59:59.000Z

87

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

88

Transmission INTRODUCTION  

E-Print Network (OSTI)

Transmission INTRODUCTION An electrical power system requires constant, second by second, balancing to maintain control over the transmission system can result in failure of the entire electrical system of supply, demand, and transmission capability. Transmission system operators are primarily responsible

89

An Overview  

Science Conference Proceedings (OSTI)

Conference Tools for 2010 TMS Annual Meeting & Exhibition ... An overview of the state-of-the-art based on the published literature is also presented.

90

Thailand Overview  

U.S. Energy Information Administration (EIA)

Countries Thailand Last Updated: February 20, 2013 (Notes) full report Overview Thailand is a net importer of oil and natural gas, although the ...

91

NGL Overview  

Gasoline and Diesel Fuel Update (EIA)

2 EIA's Proposed NGL Realignment: Overview June 4, 2013 Butanes include normal butane and isobutane. 3 Changes proposed by EIA to realign NGL data and related terminology...

92

EXECUTIVE OVERVIEW  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

at the Waste Management Conference ("Visible, Endurable, Enforceable Institutional Controls: Weldon Spring Site-A 10-Year Journey"). EXECUTIVE OVERVIEW U.S. Department of Energy...

93

Kazakhstan Overview  

U.S. Energy Information Administration (EIA)

Countries Kazakhstan Last Updated: October 28, 2013 (Notes) full report Overview Kazakhstan, an oil producer since 1911, has the second largest oil ...

94

RPWG Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

RPWG RPWG Overview of the Radiative Processes Working Group Dave Turner RPWG Chair 2008 ARM Science Team Meeting 11 March 2008 Norfolk, Virginia Overview of the RPWG RPWG Steering Group * Bob Ellingson * Chuck Long * Sally McFarlane * Andy Vogelmann Represent about 40 RPWG members Overview of the RPWG ARM Program Objectives * Relate observed radiative energy (spectrally and temporally resolved) to temperature and composition of the atmosphere * Develop and test parameterizations of the radiative properties and processes of water vapor, clouds, and aerosols, and incorporate these parameterizations in GCMs ARM Science Plan October 2004 Overview of the RPWG Clear-sky GCM vs observations comparisons Wild, Long, Ohmura, 2006, JGR Improved agreement for clear-sky SW from AMIP1

95

Transmission policy in the United States  

E-Print Network (OSTI)

This paper provides an overview of the development of electric power transmission access, pricing and investment policies in the U.S. over the last 15 years and evaluates the current state of those policies. Pre-liberalization ...

Joskow, Paul L.

2004-01-01T23:59:59.000Z

96

Running Jobs Overview for Edison  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview Overview Overview Overview and Basic Description Jobs on Edison execute on one or more "compute" nodes dedicated to that job. These nodes are distinct from the shared "login" nodes that host interactive sessions and the shared "MOM" nodes that execute commands from a "batch script" that controls how the job runs. Typically, users write the batch script with a text editor and submit it to the system using the "qsub" command. The batch script contains a number of job control directives and also the "aprun" command that actually runs the program in parallel on the compute nodes. It is possible to run small, short parallel jobs interactively as described in the pages in this section. Pages in this section explain the process in more detail.

97

Running Jobs Overview for Edison  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview Overview Overview Overview and Basic Description Jobs on Edison execute on one or more "compute" nodes dedicated to that job. These nodes are distinct from the shared "login" nodes that host interactive sessions and the shared "MOM" nodes that execute commands from a "batch script" that controls how the job runs. Typically, users write the batch script with a text editor and submit it to the system using the "qsub" command. The batch script contains a number of job control directives and also the "aprun" command that actually launches the program on to the compute nodes. It is possible to run small, short parallel jobs interactively as described in the pages in this section. Pages in this section explain the process in more detail.

98

Overview of Demand Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08 PJM 08 PJM www.pjm.com ©2003 PJM Overview of Demand Response PJM ©2008 PJM www.pjm.com ©2003 PJM Growth, Statistics, and Current Footprint AEP, Dayton, ComEd, & DUQ Dominion Generating Units 1,200 + Generation Capacity 165,000 MW Peak Load 144,644 MW Transmission Miles 56,070 Area (Square Miles) 164,250 Members 500 + Population Served 51 Million Area Served 13 States and DC Generating Units 1,200 + Generation Capacity 165,000 MW Peak Load 144,644 MW Transmission Miles 56,070 Area (Square Miles) 164,250 Members 500 + Population Served 51 Million Area Served 13 States and DC Current PJM RTO Statistics Current PJM RTO Statistics PJM Mid-Atlantic Integrations completed as of May 1 st , 2005 ©2008 PJM

99

Systems Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Partnership Program Partnership Program Presented to the Nuclear Energy Advisory Committee Paul Lisowski Deputy Assistant Secretary for Fuel Cycle Technology/GNEP Deputy Program Manager Office of Nuclear Energy U.S. Department of Energy April 21, 2008 April 21, 2007 NEAC GNEP Overview 2 Outline The Global Nuclear Energy Partnership Program - GNEP Program overview - Major Program Accomplishments - Summary Industry Input - Dan Stout - DOE Research and Development Program - Phillip Finck INL International Program - Ed McGinnis - DOE April 21, 2007 NEAC GNEP Overview 3 World energy demand is growing substantially, especially in developing nations World energy consumption is predicted by the Energy Information Administration to increase by 57 percent through 2030. Total energy consumption in non-

100

Management Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VHTR Materials Overview VHTR Materials Overview Richard Wright Idaho National Laboratory DOE-NE Materials Crosscut Coordination Meeting Tuesday July 30, 2013 High Temperature Metals Overview  Focus of the program is characterization of Alloy 617 behavior and high temperature design methods for ASME Code qualification  ASME Task Group on Alloy 617 Qualification has been established - Two part activity * Subsection NB Below 427 o C data nearly complete - fatigue design curve remaining to be determined * Subsection NH above 427 o C significant ongoing elevated temperature testing  Support from NGNP Program, Small Modular Reactor Program and NEUP 2 100 1000 10000 1.E+02 1.E+04 1.E+06 1.E+08 1.E+10 S (MPa) Cycles to Failure Si=0.5(Det)E Diercks design curve I-9.5M hypothetical design curve

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Regulatory overview  

Science Conference Proceedings (OSTI)

The end of 2012 and beginning of 2013 was a busy time for US regulators and standard-setters as two regulations and one consensus standard made the news. All have implications for oilseed processing and edible oil refining. Regulatory overview Public

102

Climate Science Overview  

Science Conference Proceedings (OSTI)

NIST Home > Climate Science Overview. NIST Greenhouse Gas Measurements and Climate Research Program Overview. Earth's climate is ...

2010-07-06T23:59:59.000Z

103

2006 National Electric Transmission Congestion Study and Related...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion Electric Transmission Study, required by section...

104

Energy Overview  

Gasoline and Diesel Fuel Update (EIA)

Overview Overview for CNA Panel Discussion May 8, 2013 | Crystal City, VA by Howard Gruenspecht, Deputy Administrator Non-OECD nations drive the increase in energy demand 2 world energy consumption quadrillion Btu Source: EIA, International Energy Outlook 2011 0 100 200 300 400 500 1990 1995 2000 2005 2010 2015 2020 2025 2030 2035 Non-OECD OECD 244 260 482 288 History Projections 2008 Howard Gruenspecht , CNA Panel May 8, 2013 Growth in income and population drive rising energy use; energy intensity improvements moderate increases in energy demand 3 average annual change (2008-2035) percent per year Source: EIA, International Energy Outlook 2011 -4 -3 -2 -1 0 1 2 3 4 5 6 7 U.S. OECD Europe Japan South Korea China India Brazil Middle East Africa Russia

105

Management Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overview - Fast Reactor and Overview - Fast Reactor and LWR Fuel Cladding Stuart A. Maloy Core Materials Technical Lead for Fuels Los Alamos National Laboratory DOE NE Materials-Cross-Coordination Webinar July 30, 2013 LA-UR-13-25972 2 Contributors  LANL: Tarik Saleh, Toby Romero, Bill Crooks, Ed Garcia, Rob Aikin jr., Osman Anderoglu, Ming Tang, Sara Perez-Berquist, Mark Bourke, Don Brown, Bjorn Clausen  PNNL: Mychailo Toloczko, Glenn Grant, David Senor, Jim Buelt  INL: Jim Cole, Randy Fielding, Jian Gan, Mitch Meyer, Bulent H. Sencer, Emmanuel Perez, Michael Teague  ORNL: T.S. Byun, David Hoelzer, M. Brady, K. Terrani, M. Fechter, L. Snead, B. Pint  Techsource: F. Garner  UCSB: G.R. Odette  UCB: P. Hosemann  SDSMT: M. West, B. Jasthi

106

A Computer Package for Transmission Line Analysis  

Science Conference Proceedings (OSTI)

A computer program, LIGNE, has been developed as a comprehensive teaching aid for the section on transmission line theory in an electromagnetics course. The program assists the student in the analysis of transmission lines, enabling him to quickly assess ...

Georges-Andre Chaudron; Manfred Nachman

1987-11-01T23:59:59.000Z

107

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

108

Transmission Enhancement Technology Report  

E-Print Network (OSTI)

to increase transmission capability. Section 3 documents existing technologies used in the industry today the traditional types of design alternatives used by Western and the electric industry. The primary system operate at three times the ampacity of Aluminum Conductor Steel Reinforced (ACSR) conductor and has a much

109

National Electric Transmission Congestion Studies  

Energy.gov (U.S. Department of Energy (DOE))

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission...

110

Overview: The Increasing Importance and Capabilities of Biomass...  

NLE Websites -- All DOE Office Websites (Extended Search)

IB IN DEPTH-Special Section on Advances in Biomass Characterization Technology brian h. davison, guest editor Overview: The Increasing Importance and Capabilities of Biomass...

111

MEETING OVERVIEW  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Las Vegas Meeting - January 1998 Las Vegas Meeting - January 1998 MEETING OVERVIEW The Transportation External Coordination Working Group (TEC/WG) held its 13th semi-annual meeting January 20-22, 1998 in Las Vegas, Nevada. Over 150 members, participants, and observers representing state, tribal, and local governments, regional groups, industry and professional organizations, and the Department of Energy met to address a variety of issues related to DOE's transportation activities for radioactive materials. A number of Departmental programs with transportation components were represented, including: the Office of Environmental Management (EM); the Office of Civilian Radioactive Waste Management; the Office of Naval Reactors (NR); the Waste

112

Management Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Partnership Partnership Status of Industry Engagement Nuclear Energy Advisory Committee (NEAC) Dan Stout Director of Nuclear Fuel Recycling Office of Nuclear Energy April 21, 2008 April 21, 2008 NEAC Meeting 2 Outline Industry Engagement Activities Funding Opportunity Announcement (FOA) - Scope, Design Requirements, Selection Criteria Industry Teams Awarded Cooperative Agreements DOE Evaluation of Industry Deliverables - Overview, initial facilities, approaches, issues and summary Next Steps April 21, 2008 NEAC Meeting 3 GNEP Industry Engagement Activities Expressions of Interest (2006) - Requested August 2006 - Received responses in September 2006 - Description: * Confidence that large facilities could be deployed by 2020 (using mature technologies) * Submittals were "proprietary"

113

MEETING OVERVIEW  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Jacksonville 1999 Meeting Jacksonville 1999 Meeting Jacksonville 1999 Meeting MEETING OVERVIEW The Transportation External Coordination Working Group (TEC/WG) held its 14th semi-annual meeting January 20-22, 1999 in Jacksonville, Florida. Over 160 members, participants, and observers representing state, tribal, and local governments, regional groups, industry and professional organizations, and the Department of Energy (DOE) met to address a variety of issues related to DOE's transportation activities for radioactive materials. A number of Departmental programs with transportation components were represented, including: the Office of Environmental Management (EM); the Office of Civilian Radioactive Waste Management

114

DOE Action Plan Addressing the Electricity Transmission System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. DEPARTMENT OF ENERGY U.S. DEPARTMENT OF ENERGY ACTION PLAN ADDRESSING THE ELECTRICITY TRANSMISSION SYSTEM ~DRAFT~ DOE Action Plan Addressing the Electricity Transmission System 1 Table of Contents * INTRODUCTION ................................................................................................................... 2 The Grid Tech Team ...................................................................................................... 2 Focus on Transmission .................................................................................................. 3 Roadmap Goals ............................................................................................................. 4 * PROCESS OVERVIEW ........................................................................................................... 5

115

Computer aided design of long-haul optical transmission systems  

Science Conference Proceedings (OSTI)

We present a general overview of the role of computer models in the design and optimization of commercial optical transmission systems. Specifically, we discuss (1) the role of modeling in a commercial setting, (2) achieving the proper balance between ... Keywords: Long-Haul (LH) transmission, Ultra-Long Haul (ULH) transmission, optical communication, optical modeling

James G. Maloney; Brian E. Brewington; Curtis R. Menyuk

2002-06-01T23:59:59.000Z

116

Smart Grid Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Grid Overview Ben Kroposki, PhD, PE Director, Energy Systems IntegraLon NaLonal Renewable Energy Laboratory What is t he S mart Grid? and DER Source: NIST/EPRI Architecture Task Group The S mart Grid is the electricity producHon a nd delivery s ystem along with consumpHon integrated with communicaHons and informaHon technology The S mart Grid is an automated, widely distributed energy delivery network characterized by a two---way flow of electricity and informaHon, capable of monitoring a nd responding t o changes in everything f rom power plants to customer preferences t o individual appliances. 2 Grid ModernizaHon - Smart Grid Scope Transmission DistribuHon End---Use and DER 2010 Smart Grid System Report, February 2012 hNp://energy.gov/sites/prod/files/2010%20Smart%20Grid%20System%20Report.pdf 3 Smart Grid Vision

117

Accounting-related transmission issues  

Science Conference Proceedings (OSTI)

Various initiatives have been undertaken by the Federal Energy Regulatory Commission (FERC) to deregulate wholesale electric energy markets. These initiatives have focused on restructuring the transmission systems in the US and recently have culminated in a proposal requiring formation of and participation in regional transmission organizations. The overall form of regulation selected to determine rates for transmission entities as well as underlying regulatory decisions reached on key issues will have profound implications for transmission entities. For example, traditional cost-based regulation would require one set of accounting and reporting rules, while incentive-based regulation may not be subject to those same rules. An overview of some of the major accounting and financial reporting issues that will need to be considered is presented.

Niehaus, M.; Bjorn, P.; Pate, G.

1999-12-01T23:59:59.000Z

118

Overview Brochures  

Office of Science (SC) Website

Brochures Brochures Basic Energy Sciences (BES) BES Home About Research Facilities Science Highlights Benefits of BES Funding Opportunities Basic Energy Sciences Advisory Committee (BESAC) News & Resources Program Summaries Brochures Reports Accomplishments Presentations BES and Congress Science for Energy Flow Seeing Matter Scale of Things Chart Contact Information Basic Energy Sciences U.S. Department of Energy SC-22/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3081 F: (301) 903-6594 E: sc.bes@science.doe.gov More Information » News & Resources Brochures Print Text Size: A A A RSS Feeds FeedbackShare Page The Basic Energy Sciences (BES) informational brochures provide an overview of BES research areas, scientific user facilities, and the relevance of the

119

Hybrid: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

button highlighted Starting Button Cruising Button Passing Button Braking Button Stopped Button subbanner graphic: gray bar button highlighted Starting Button Cruising Button Passing Button Braking Button Stopped Button subbanner graphic: gray bar OVERVIEW Hybrid-electric vehicles combine the benefits of gasoline engines and electric motors to provide improved fuel economy. The engine provides most of the vehicle's power, and the electric motor provides additional power when needed, such as for accelerating and passing. This allows a smaller, more-efficient engine to be used. The electric power for the motor is generated from regenerative braking and from the gasoline engine, so hybrids don't have to be "plugged in" to an electrical outlet to recharge. stage graphic: vertical blue rule Main stage: See through car with battery, engine, and electric motor visible. The car is stopped at an intersection.

120

MEETING OVERVIEW  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Charleston Meeting - January 1997 Charleston Meeting - January 1997 MEETING OVERVIEW The Transportation External Coordination Working Group (TEC/WG) held its eleventh semi-annual meeting January 14-16, 1997 in Charleston, South Carolina. Over one hundred participants, representing state, tribal and local governments, regional groups, industry, professional organizations, and the U.S. Department of Energy, met to address a variety of issues related to DOE's transportation activities for radioactive materials. The following summarizes the major discussions and action items from the meeting. TOPIC GROUP SUMMARIES Topic Groups have been formed with TEC/WG participants having particular interest or expertise in each of four areas: Route Identification, Funding and Technical Assistance for Emergency Preparedness, Railroad Operational

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Hybrid: Overview  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

button highlighted Starting Button Cruising Button Passing Button Braking Button Stopped Button subbanner graphic: gray bar button highlighted Starting Button Cruising Button Passing Button Braking Button Stopped Button subbanner graphic: gray bar OVERVIEW Hybrid-electric vehicles combine the benefits of gasoline engines and electric motors to provide improved fuel economy. The engine provides most of the vehicle's power, and the electric motor provides additional power when needed, such as for accelerating and passing. This allows a smaller, more-efficient engine to be used. The electric power for the motor is generated from regenerative braking and from the gasoline engine, so hybrids don't have to be "plugged in" to an electrical outlet to recharge. stage graphic: vertical blue rule Main stage: See through car with battery, engine, and electric motor visible. The car is stopped at an intersection.

122

JGI - CSP Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview of the Community Science Program CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ What is the Community Science Program?...

123

UnitOverview  

NLE Websites -- All DOE Office Websites (Extended Search)

UNIT OVERVIEW A general overview of LHC physics, accelerator and detector design, and how data inform claims and reasoning begins with an exploration of the "Big Questions" that...

124

Federal Buildings Supplemental Survey -- Overview  

U.S. Energy Information Administration (EIA) Indexed Site

Survey > Overview Survey > Overview Overview Percent of FBSS Buildings and Floorspace by Selected Agencies, FY 1993 Percent of FBSS Buildings and Floorspace by Selected Agencies, FY 1993 Sources: Energy Information Administration, Energy Markets and End Use, 1993 Federal Buildings Supplemental Survey. Divider Line Highlights on Federal Buildings The Federal Buildings Supplemental Survey 1993 provides building-level energy-related characteristics for a special sample of commercial buildings owned by the Government. Extensive analysis of the data was not conducted because this report represents the 881 responding buildings (buildings for which interviews were completed) and cannot be used to generalize about Federal buildings in each region. Crosstabulations of the data from the 881 buildings are provided in the Detailed Tables section.

125

NETL Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

System System Asset Optimization Activity 430.01.03 March 4, 2011 Sponsored by the U.S. Department of Energy, Office of Fossil Energy - Strategic Center for Coal 2 Approach * Searched literature to understand current state of industry thinking around Asset Optimization * Reviewed previous NETL SGIS work to give team members a clear understanding of asset optimization opportunities "offered" by the Smart Grid * Used team members' utility experiences * Identified opportunities for further research (areas not currently getting much attention) 3 What is Asset Optimization? * General Definition - A broad set of interrelated decisions on obtaining, operating, and maintaining physical and human resources for electricity generation, transmission, and distribution that minimize the total cost of providing

126

GTT 2012 Transmission Workshop - Documents | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop - Documents Transmission Workshop - Documents GTT 2012 Transmission Workshop - Documents Use the links below to download documents from the GTT's Transmission Workshop, held November 1-2, 2012 Agenda Roster of Attendees Presentation - Overview - Anjan Bose, DOE Presentation - EERE Issues and Opportunities - David Danielson, DOE Presentation - Vision for the Future - Lauren Azar, DOE Presentation - Tomorrow's Power System - Michael Heyeck, EPRI Presentation - FERC Overview - Cheryl LaFleur, FERC Presentation - ISO/RTO Challenges and Opportunities - Carl Monroe, Southwest Power Pool Product - Future Vision & Grid Challenges: Summary Results of Breakout Group Discussions Product - Opportunities to Overcome Key Challenges: Summary Results of Breakout Group Discussions Product - Final Discussion Summary Report

127

Cooperation (Transmission  

E-Print Network (OSTI)

Pricing in Wireless Networks Peter Marbach Department of Computer Science University of Toronto #12; Model/Terminology A B #15; Routes are Fixed #15; C r : Capacity of Node r #15; U r (x r ): Utility Function of Node r 6 #12; Model/Terminology #15; x r : Transmission Rate of Node r #15; y r

Marbach, Peter

128

An Overview of the Operation of Ontario's Electricity Market  

E-Print Network (OSTI)

reserves as well as a financial market for transmission rights, administered by the Independent Electricity, Ontario power industry, electricity market design, transmission rights. I. INTRODUCTION THE electric power1 An Overview of the Operation of Ontario's Electricity Market H. Zareipour, Student Member, IEEE

Cañizares, Claudio A.

129

Transmission/Resource Library | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transmission/Resource Library < Transmission Jump to: navigation, search ResourceLibraryHeader.png Public Involvement Resources GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database About Transmission Electricity Transmission: A Primer Overview of the grid system and the role of states in overseeing this system. The Design, Construction, and Operation of Long-Distance High-Voltage

130

Overview of Rocky Mountain Region's Capital Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Workshop Planning Workshop Overview of Western's Current Transmission Planning Activities Robert H. Easton aeaston@wapa.gov (970) 461-7272 Transmission Planning - North Loveland, CO June 21, 2011 1 Transmission Planning Workshop AGENDA - 10-Yr Network Study Process NERC TPL- Study Process Capital Investment Plan 2 Transmission Planning Workshop 2011 10-YR Network Load Forecast Study and Process Transmission Planning Loveland, CO June 21, 2011 3 Purpose  Evaluate the steady state load serving capability of the integrated system.  Identify problem areas due to projected system load growth.  Allows for inclusion of necessary projects in Capital Investment Plan (CIP).  Ensure that system development keeps pace with load growth in order to continue serving Preference

131

European Section  

Science Conference Proceedings (OSTI)

European geographical region. European Section Sections achievement application award awards canadian distinguished division fats member membership memorial network nomination oils poster program recognizing research section service European Secti

132

Electrical transmission line diametrical retainer  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

133

2004 Power Marketing Plan - Base Resource Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Contract Overview Contract Overview 08/16/00 1 of 3 2004 Power Marketing Plan Base Resource Contract Overview The following summarizes the main provisions of the Base Resource Contract: Section 4 (Termination of amendment for right to purchase after 2004): * Terminates the existing contract amendments that provide for a customer's right to purchase power from Western after 2004. Execution of the Base Resource contract sustains a customer's right to purchase after 2004. Section 5 (Effective date and term of contract): Provides for: * Base Resource contracts to be effective upon execution by Western. * Base Resource contracts to remain in effect until December 31, 2024, subject to prior termination. * Service to begin under the Base Resource contract on January 1, 2005. Section 7 (Base Resource estimates and availability forecast):

134

Airspace: Antarctic Sound Transmission  

E-Print Network (OSTI)

Antarctic Sound Transmission Andrea Polli Director,investigates how sound transmission can contribute to thePoles. How have such transmission-based projects developed

Polli, Andrea

2009-01-01T23:59:59.000Z

135

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

136

Hanford System Overview  

CHG0612-16.0 CH2M-32399-VA Hanford System Overview Hanford System Overview January 23-24, 2007 Paul Certa Tom Crawford Aluminum and Chromium Leaching for

137

Structural Repairs for Transmission Structures: Anchors, Poles, and Lattice Construction  

Science Conference Proceedings (OSTI)

This document provides a brief overview of repair methods for transmission line lattice and pole structures and provides guidance on the complex financial issue of how to determine whether a corrosion repair should be accounted for as capital or expense. BackgroundAs the North American electrical transmission system ages, many issues have to be addressed to keep the system functioning. The high voltage ...

2012-12-12T23:59:59.000Z

138

Microsoft Word - 2006_INSF-Overview.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

INSF Overview INSF Overview Section 2-5-1 Interfacial and Nanoscale Science Facility The Interfacial & Nanoscale Science Facility (INSF) is a world-class resource for scientific expertise and instrumentation focused on the study of interfacial phenomena and nano- science and technology. This section summarizes the capabilities available in the INSF, along with research programs associated with facility users. Activities in the facility address national needs in environmental restoration, waste management, pollution prevention, energy production and storage, and national and homeland security through research that specializes in preparation, characterization, and reactivity of surfaces and interfaces. The range of scientific expertise and instrumentation within the facility provides a unique

139

Arizona/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

140

Termination for superconducting power transmission systems  

DOE Patents (OSTI)

This patent relates to a cold, electrical gradient, terminal section for a superconducting cable for alternating current power transmission. A cold electrical gradient section filled with a gaseous coolant acting as an insulator is provided in series with a separate thermal gradient section. (auth)

Forsyth, E.B.; Jensen, J.E.

1975-08-26T23:59:59.000Z

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

2009 Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Electric Transmission Congestion Study 9 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

142

2009 Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

143

Australasian Section  

Science Conference Proceedings (OSTI)

The Australasian Section brings together professionals in the Australia and Pacific Rim geographical regions. Australasian Section Sections achievement application award awards canadian distinguished division fats member membership memorial networ

144

Asian Section  

Science Conference Proceedings (OSTI)

Taiwan, Japan, and Korea geographical regions. Asian Section Sections achievement application award awards canadian distinguished division fats member membership memorial network nomination oils poster program recognizing research section service

145

Colorado/Transmission/Regulatory Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission Regulatory Roadmap Roadmap State Data Regulatory Overview General TOOLS Regulatory Roadmap Regulatory Wizard Best Practices Document Library NEPA Database Glossary TECHNOLOGIES Geothermal Solar Water Wind TOPICS Land Use Planning Land Access Exploration Well Field Power Plant Transmission Water Rights Environment The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart

146

Canadian Section  

Science Conference Proceedings (OSTI)

Bringing together professionals from Canadian geographical regions. Canadian Section Sections achievement application award awards canadian distinguished division fats member membership memorial network nomination oils poster program recognizing r

147

Regional Transmission Projects: Finding Solutions  

Science Conference Proceedings (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

148

Hydromechanical transmission  

DOE Patents (OSTI)

A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

Orshansky, Jr. deceased, Elias (LATE OF San Francisco, CA); Weseloh, William E. (San Diego, CA)

1978-01-01T23:59:59.000Z

149

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

150

EPAct 2005 Metering Guidance Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPAct 2005 Metering Guidance EPAct 2005 Metering Guidance Overview Dave Hunt Pacific Northwest National Laboratory Section 103 Requirements * What to meter - Building electric usage - All buildings * How to meter - Standard meters - Advanced meters * When - by 10/1/2012 FEMP's Response * Metering guidance document * Agency planning workshops * Metering training course * Metering Best Practices Guide (FY 2007) Important Dates * August 3, 2006 - agency plans due * As determined by individual agencies - site metering plans * October 1, 2012 - compliance deadline Issues * Funding * Practicability * EPAct time-based rate schedule * Agency policies/guidance Potential Roles for Utilities * Guidance/updates on time-based pricing * Metering services * Finance installations * Other? Useful Documents

151

Overview of Geothermal Energy Development  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Geothermal Energy Geothermal Energy Development Kermit Witherbee Geothermal Geologist/Analyst DOE Office of Indian Energy Webcast: Overview of Geothermal Energy Development Tuesday, January 10, 2012 Geothermal Geology and Resources Environmental Impacts Geothermal Technology - Energy Conversion Geothermal Leasing and Development 2 PRESENTATION OUTLINE GEOTHERMAL GEOLOGY AND RESOURCES 3 Geology - Plate Tectonics 4 Plate Tectonic Processes Schematic Cross-Section "Extensional" Systems- "Rifting" Basin and Range Rio Grand Rift Imperial Valley East Africa Rift Valley "Magmatic" Systems Cascade Range 6 Geothermal Resources(USGS Fact Sheet 2008-3062) 7 State Systems

152

Photovoltaics: Program overview fiscal year 1993  

SciTech Connect

This overview is divided into sections titled: 1993 PV program accomplishments, PV systems for today`s markets generate power and experience, systems development and testing prepares products for market, advances in manufacturing hasten availability of innovations, cooperative research improves PV technology, additional achievements in cooperative R&D, and summary of PV program services. Figs, tabs.

1994-02-01T23:59:59.000Z

153

DOE Solar Energy Technologies Program: Overview and Highlights  

DOE Green Energy (OSTI)

A non-technical overview of the U.S. Department of Energy's Solar Energy Technologies Program, including sections on photovoltaics (PV), concentrating solar power, and solar heating and lighting R&D.

Not Available

2006-05-01T23:59:59.000Z

154

Idaho/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Roadmap Idaho/Transmission/Roadmap < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

155

Renewable Project Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Overview Project Overview Federal Utility Partnership Working Group 5/6/09 Chandra Shah, NREL 303-384-7557, chandra.shah@nrel.gov National Renewable Energy Laboratory Innovation for Our Energy Future Presentation Overview Federal and utility renewable requirements Power Purchase Agreements (PPA) Western Area Power Administration Federal Renewable Program UESC and renewables * Participating in utility renewable programs - Opportunity Announcement process Renewable projects implemented using appropriations National Renewable Energy Laboratory Innovation for Our Energy Future Biomass Resource

156

Hydropower Program Technology Overview  

DOE Green Energy (OSTI)

New fact sheets for the DOE Office of Power Technologies (OPT) that provide technology overviews, description of DOE programs, and market potential for each OPT program area.

Not Available

2001-10-01T23:59:59.000Z

157

Overview Documents: Document 0706963  

NLE Websites -- All DOE Office Websites (Extended Search)

Related Sites Feedback Overview Documents Page 143 Next - - - > < - Previous Atomic Energy Commission Plan for Expansion of Research in Biology and Medicine. Note by the...

158

Overview Documents: Document 0703019  

NLE Websites -- All DOE Office Websites (Extended Search)

Sites Feedback Overview Documents Page 19 Next - - - > < - Previous U.S. Atomic Energy Commission Minutes of Commissioners' Executive Session 74 - 29 May 13, 1974 Document...

159

SF6 Emissions Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

SF 6 Emissions Overview Joanna Eckstein and Penny Avery Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned...

160

EV Project Overview Report  

NLE Websites -- All DOE Office Websites (Extended Search)

EV Project Overview Report Project to Date through March 2011 Charging Infrastructure Number of EV Project Number of Electricity Charging Units Charging Events Consumed Region...

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

FRN Request for Proposals for New or Upgraded Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 AGENCY:...

162

National Nuclear Security Administration Overview | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Security Administration Overview National Nuclear Security Administration Overview National Nuclear Security Administration Overview More Documents & Publications National...

163

Transportation Emergency Preparedness Program Exercise Overview...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Exercise Overview Transportation Emergency Preparedness Program Exercise Overview Transportation Emergency Preparedness Program Exercise Overview More Documents &...

164

USA Section  

Science Conference Proceedings (OSTI)

Section is made up of professionals in the USA. USA Section Membership Information achievement application award Awards distinguished division Divisions fats job Join lipid lipids Member member get a member Membership memorial nomination oils post

165

Indian Section  

Science Conference Proceedings (OSTI)

Bringing together professionals in the geographic area of India. Indian Section Sections achievement application award awards canadian distinguished division fats member membership memorial network nomination oils poster program recognizing resear

166

Department of Energy Corporate Overview - 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Corporate Overview - 2012 Department of Energy Corporate Overview - 2012 Department of Energy Corporate Overview - 2012 This book provides an overview of the Department of Energy (DOE). The opening sections describe the mission areas, organizational structure and upcoming critical issues of the Department, followed by brief descriptions of DOE's goals and programs. Later sections provide overviews of the Department's budget, staffing, contract management, project management, Congressional jurisdiction, Government Accountability Office (GAO) and DOE's Inspector General (IG) oversight and DOE high-visibility rulemakings. We hope that this document enables you to acquire useful information about DOE. If you have any questions, please contact the Office of Program Analysis and Evaluation, at 202-586-1911.

167

RRTT - Rapid Response Team for Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rapid Response Team- Rapid Response Team- Transmission Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West TRIBAL LEADER FORUM SERIES February 7, 2012 Laura Smith Morton Department of Energy Laura.morton@hq.doe.gov Nine Agency MOU * Improves uniformity, consistency, and transparency - Establishes the roles and responsibilities of the nine signatory agencies regarding electric transmission infrastructure project applicants * Provides single point of contact for coordinating all federal authorizations required to locate electric transmission facilities on federal land * Establishes DOE (under authority pursuant to section 216(h) of the FPA) as lead agency for coordinating all federal authorizations and related environmental

168

SECTION THIRTY SEVEN Consultants Section Thirty Seven Consultants, Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THIRTY SEVEN THIRTY SEVEN Consultants Section Thirty Seven Consultants, Inc. A California Corporation 1 DEPARTMENT OF ENERGY [OE Docket No. RRTT-IR-001] Rapid Response Team for Transmission AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy, DoE. ACTION: Request for information. (1) The development timelines for generation and attendant transmission are often not coordinated or run concurrently. Because of the lengthy time to obtain regulatory reviews, permits and approvals (collectively ''Regulatory Permits''), major new transmission lines can take significantly longer to develop than some types of generation to which the transmission would connect. This Request for Information will refer to the difference in development times between generation and transmission as

169

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

170

Regulations for Electric Transmission and Fuel Gas Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long...

171

DOE Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop November 1, 2012 Federal Energy Regulatory Commission Commissioner Cheryl LaFleur 1 FERC's Transmission Efforts Reliability and Grid Security Planning...

172

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Usage Transmission Transmission Once electricity is generated -- whether by burning fossil fuels; through nuclear fission; or by harnessing wind, solar, geothermal, or hydro...

173

Merchant transmission investment  

E-Print Network (OSTI)

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

174

Microsoft Word - 2006_MSCF_Overview.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

MSCF Overview MSCF Overview Section 2-6-1 Molecular Science Computing Facility The Molecular Science Computing Facility (MSCF) supports a wide range of computational activities in environmental molecular research, from benchmark calculations on small molecules to reliable calculations on large molecules, from solids to simulations of large biomolecules, and from reactive chemical transport modeling to regional cloud climate modeling. MSCF provides an integrated production computing environment with links to external facilities and laboratories within the U.S. Department of Energy (DOE) system, collaborating universities, and industry. Capabilities MSCF provides computational resources for Computational Grand Challenges in environmental molecular science and basic and applied research

175

Microsoft Word - 2006_ESB_Overview.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

ES&B Overview ES&B Overview Section 2-2-1 Environmental Spectroscopy and Biogeochemistry Facility The Environmental Spectroscopy and Biogeochemistry (ES&B) Facility supports experimental and modeling studies of chemical phenomena and mechanisms on mineral and microbe surfaces and on complex heterogeneous environmental materials from soils, sediments, and groundwater zones. ES&B Facility staff members, along with other Pacific Northwest National Laboratory staff, form a multidisciplinary research team with expertise in chemistry, mineral physics, geochemistry, soil chemistry, microbiology, and hydrology and advanced computational methods. Capabilities Capabilities are available for materials characterization, aqueous- and solid-phase speciation

176

Transmission Planning for Wind Energy: Status and Prospects  

Science Conference Proceedings (OSTI)

This paper provides an overview of major transmission planning activities related to wind integration studies in the US and Europe. Transmission planning for energy resources is different from planning for capacity resources. Those differences are explained, and illustrated with examples from several regions of the US and Europe. Transmission planning for wind is becoming an iterative process consisting of generation expansion planning, economic-based transmission planning, system reliability analysis, and wind integration studies. A brief look at the policy environment in which this activity is taking place is provided.

Smith, J. C.; Osborn, D.; Piwko, R.; Zavadil, R.; Parsons, B.; Hawkins, D.; Lasher, W.; Nickell, B.

2009-01-01T23:59:59.000Z

177

NOTATION........................................................................................................................... vii 1 ELECTRICITY TRANSMISSION SYSTEM OVERVIEW......................................... 1  

E-Print Network (OSTI)

gallon reservoir, in a hot water bath, microcrystalline wax in keroser.e solutions and several crude Oil anvestigatea para::tr aepcsataon usng #12;-- 17 -- a deporsiion ce:Ll in a circulation loop as developed was maintained ac 2tt C ann clrcujatea tarougi. te deposition cell at the rate of 1.06 cm/S waich corresponcied

Argonne National Laboratory

178

Property:GRR/SectionNumber | Open Energy Information  

Open Energy Info (EERE)

SectionNumber SectionNumber Jump to: navigation, search Property Name GRR/SectionNumber Property Type Number Description The section number of a section in the Geothermal Regulatory Roadmap. The value of this property is derived automatically by the section template and is used in sorting sections on the GRR Home page. Subproperties This property has the following 2 subproperties: G GRR/Section 6-HI-d - Oversize and/or Overweight Vehicles and Loads Permit GRR/Section 7 - Power Plant Siting/Construction Overview Pages using the property "GRR/SectionNumber" Showing 25 pages using this property. (previous 25) (next 25) G GRR/Section 1 - Land Use Overview + 1 + GRR/Section 1-AK-a - Land Use Considerations + 1 + GRR/Section 1-CA-a - State Land Use Planning + 1 +

179

AEO2014 Early Release Overview  

U.S. Energy Information Administration (EIA)

U.S. Energy Information Administration Annual Energy Outlook 2014 Early Release Overview 3 AEO2014 Early Release Overview decade for the first time ...

180

WebMetrics: Technical Overview  

Science Conference Proceedings (OSTI)

VUG Home Page NIST Web Metrics Technical Overview. Technical Overview. NIST Logo. Good usability is critical to the success of a website. ...

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Notice of Intent for the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line (DOE/EIS-0379) (05/05/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

56 56 Federal Register / Vol. 70, No. 86 / Thursday, May 5, 2005 / Notices Angeles to change between direct current and alternating current. This proposed converter station would be located in the vicinity of BPA's Port Angeles Substation in Clallam County, Washington, and would occupy from one to two acres. OC has proposed that the converter station be sited within the existing boundary of the Port Angeles Substation on property leased or otherwise transferred from BPA to OC. OC has proposed to begin construction of the HVDC transmission line and converter station by June 2006. Under this schedule, the HVDC system would be interconnected to the FCRTS in the fall of 2007, with a proposed operation date of December 2007. Once constructed, all existing land use and

182

Advanced Vehicle Testing Activity: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview to Overview to someone by E-mail Share Advanced Vehicle Testing Activity: Overview on Facebook Tweet about Advanced Vehicle Testing Activity: Overview on Twitter Bookmark Advanced Vehicle Testing Activity: Overview on Google Bookmark Advanced Vehicle Testing Activity: Overview on Delicious Rank Advanced Vehicle Testing Activity: Overview on Digg Find More places to share Advanced Vehicle Testing Activity: Overview on AddThis.com... Home Overview Light-Duty Vehicles Medium- and Heavy-Duty Vehicles Publications Overview The marketplace for advanced transportation technologies and the focus, direction, and funding of transportation programs are continually changing. The Advanced Vehicle Testing Activity's "2005 Overview of Advanced Technology Transportation" (PDF 736 KB) gives the latest information about

183

Western Regional Partnership Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Partnership Overview Regional Partnership Overview June 2013 Briefing Overview  WRP Background  Importance of Region  WRP Tribal Relations Committee  WRP Energy Committee WRP Region's Uniqueness  5 states stretching from the Great Plains to the Pacific Ocean  Diverse terrain ranging from desert valleys to forested mountains  Significant State Trust Landholdings  Approximately 188 Federally recognized Tribes  Significant amounts of Federally managed land  According to GSA 2004 study, WRP states range from 41.8% - 84.5% of total state land WRP Region's Importance to DoD  Extensive Training Ranges  Interconnected ground/air ranges provide unmatched warfighter training opportunities

184

Dispersion-free radial transmission lines  

SciTech Connect

A dispersion-free radial transmission line ("DFRTL") preferably for linear accelerators, having two plane conductors each with a central hole, and an electromagnetically permeable material ("EPM") between the two conductors and surrounding a channel connecting the two holes. At least one of the material parameters of relative magnetic permeability, relative dielectric permittivity, and axial width of the EPM is varied as a function of radius, so that the characteristic impedance of the DFRTL is held substantially constant, and pulse transmission therethrough is substantially dispersion-free. Preferably, the EPM is divided into concentric radial sections, with the varied material parameters held constant in each respective section but stepwise varied between sections as a step function of the radius. The radial widths of the concentric sections are selected so that pulse traversal time across each section is the same, and the varied material parameters of the concentric sections are selected to minimize traversal error.

Caporaso, George J. (Livermore, CA); Nelson, Scott D. (Patterson, CA)

2011-04-12T23:59:59.000Z

185

Overview - Data Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Help > Data Management Help > Data Management Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Overview Welcome to the data management pages for data providers to the ORNL Distributed Active Archive (DAAC). These pages provide an overview of data management planning and preparation and offer practical methods to successfully share and archive your data. Plan - write a short data management plan while preparing your research proposal, Manage - assign logical, descriptive file names, define the contents of your data files, and use consistent data values when preparing

186

Franklin Job Launch Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Job Launch Overview Job Launch Overview Job Launch Overview Overview and Basic Description Franklin has three basic types of nodes. Compute Nodes The 9,572 compute nodes each have a quad-core 2.3 GHz Opteron processor and 8 GB of memory shared by the 4 cores. The compute nodes run a restricted low-overhead operating system optimized for high performance computing. This OS supports only a limited number of system calls and UNIX commands, and does not officially support user-created dynamic-load libraries. A single given compute node is always allocated to run a single user job; multiple jobs never share a compute node. Service Nodes (Login Nodes) Franklin's service nodes run a full Linux operating system and provide support services for the system. Some of these service nodes serve

187

Synoptic Overview of RACORO  

NLE Websites -- All DOE Office Websites (Extended Search)

March 31 st , 2009 Louisville, KY Synoptic Overview * What is going on with the weather? * The following slides will give some insight into why the weather has been so...

188

Technical Reference OVERVIEW  

NLE Websites -- All DOE Office Websites (Extended Search)

and the ENERGY STAR Score in the United States and Canada Page 1 Parking and the ENERGY STAR Score in the United States and Canada Technical Reference OVERVIEW The ENERGY STAR...

189

Independent transmission company (ITC) and markets for transmission  

E-Print Network (OSTI)

Independent Abstract-- transmission company (ITC) and markets for transmission Yong T. Yoon Marija a fundamental structure for the transmission provider (TP) composed of the independent transmission company (ITC out the associated functions including managing transmission congestion. At the minimum

Ilic, Marija D.

190

Geothermal environmental overview project  

DOE Green Energy (OSTI)

The basic purpose of the Geothermal Environmental Overview Project is to summarize and assess the state of environmental issues of the top priority KGRAs from among the 37 KGRAs currently identified by the Division of Geothermal Energy as having possibility for commercial development. The objectives of the Overview Project are inventory of available data, assessment of available data, identification of data gaps, and identification of key issues. (JGB)

Anspaugh, L.R.

1977-10-25T23:59:59.000Z

191

Three essays concerning information transmission  

E-Print Network (OSTI)

Transmissionas an Information-Transmission Mechanism, American EconomicConcerning Information Transmission A dissertation submitted

Boone, Johnathan

2010-01-01T23:59:59.000Z

192

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

193

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

194

GTC Overview Slide  

NLE Websites -- All DOE Office Websites (Extended Search)

and application of Grid-Scale Power Electronics Devices and Systems Vision An advanced electricity transmission and distribution network that: *Is efficient, reliable, and...

195

NATURALHY Project Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

and might have impact on: * Safety aspects of transmission - distribution - end use * Pipeline durability * Pipeline integrity * End user appliances' performance Prepared by O....

196

Colorado/Transmission/State Data Documents | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/State Data Documents < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission State Data Documents Roadmap State Data Regulatory Overview General Print PDF Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution.

197

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

198

Data transmission element for downhole drilling components  

DOE Patents (OSTI)

A robust data transmission element for transmitting information between downhole components, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The data transmission element components include a generally U-shaped annular housing, a generally U-shaped magnetically conductive, electrically insulating element such as ferrite, and an insulated conductor. Features on the magnetically conducting, electrically insulating element and the annular housing create a pocket when assembled. The data transmission element is filled with a polymer to retain the components within the annular housing by filling the pocket with the polymer. The polymer can bond with the annular housing and the insulated conductor but preferably not the magnetically conductive, electrically insulating element. A data transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT)

2006-01-31T23:59:59.000Z

199

Section J  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

M-1 Section J Appendix M Key Design, Licensing and Site Management M&O Milestone Chart Activity Planned Date Develop and Submit CD-2 (25%-30%) 082009 Submission of Construction...

200

SECTION M  

NLE Websites -- All DOE Office Websites (Extended Search)

using the policies and procedures in FAR Part 15 and DEAR Part 915. A Source Evaluation Board (SEB) will evaluate proposals using the criteria in this Section M. The Source...

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

AEO2008 Overview - Early Release  

Gasoline and Diesel Fuel Update (EIA)

08 08 Overview Energy Trends to 2030 In preparing projections for the Annual Energy Out- look 2008 (AEO2008), the Energy Information Ad- ministration (EIA) evaluated a wide range of trends and issues that could have major implications for U.S. energy markets between today and 2030. 1 This over- view focuses on one case, the reference case, which is presented and compared with the Annual Energy Outlook 2007 (AEO2007) reference case (see Table 1). Readers are encouraged to review the full range of alternative cases included in other sections of AEO2008. As in previous editions of the Annual Energy Outlook (AEO), the reference case assumes that current poli- cies affecting the energy sector remain unchanged throughout the projection period. Some possible pol- icy changes-notably, the adoption of policies to limit or reduce greenhouse gas emissions-could change the reference case projections

202

2006 National Electric Transmission Congestion Study and Related Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study and Related 6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints and identifies areas that are transmission-constrained. This is the first Congestion Study the Department conducted. Based on this study, two National Interest Electric Transmission Corridors were designated in 2007. They were invalidated by a federal appeals court in 2011. Comments and form letters were submitted by the public in response to this study. National Electric Transmission Congestion Study 2006 Executive Summary Full Text of the National Electric Transmission Congestion Study 2006

203

Trends In U.S. Electric Power Transmission  

SciTech Connect

The report provides an overview of the changes that are occurring in the industry to implement the goals of improved reliability and reduced congestion costs. As the electric industry works to become a more efficient market, transmission stands as a key link between the competitive generation and the regulated distribution sectors. In this role as a key link, transmission is a major focus of government efforts to improve reliability and reduce congestion costs. The scope of the report is to analyze the dominant reliability, investment, siting, and competition/open access trends that are occurring in the domestic electric transmission industry. Topics covered include: the impact of the 2003 Northeast blackout on reliability rules; the move from voluntary to mandatory reliability standards; the advent of real-time transmission system monitoring; ISO/RTO efforts to improve system reliability; the drivers of government intervention in transmission investment; the move towards incentive-based rates for transmission investment; legislative and regulatory efforts to spur transmission investment to support renewable energy resources; the emergence of merchant transmission; the need for federal backstop authority on regional transmission projects; the designation of national interest electric transmission corridors; FERC Orders on siting transmission; the need for changes in open access and competition regulations; FERC efforts to increase open access and competition; legislative efforts to increase competition; and, current competitive issues in the industry.

NONE

2007-11-15T23:59:59.000Z

204

Section 120  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 Web Based Atmospheric Radiation Measurement Satellite and Mesonet Data Viewers (http://www.xdc.arm.gov/sisg/data_viewers) L. Benedict, R. Wagener, J. Tichler and S. A. Barr-Kumarakulasinghe ARM External Data Center (XDC) Brookhaven National Laboratory Upton, New York P. Minnett Rosentiel School of Marine and Atmospheric Science University of Miami Miami, Florida Abstract The implementation of a set of web-based viewers for mesonet and satellite data is presented. The mesonet data viewers were created to allow data users to plot different variables contained within a data set. The satellite data viewers were created to give a data user a quick overview of the conditions, data quality, and data availability during a particular time period as depicted by the satellite imagery. The overall aim of the web-

205

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

206

Arnold Schwarzenegger TRANSMISSION BENEFIT  

E-Print Network (OSTI)

California Edison's (SCE) initial Tehachapi transmission trunk-line proposal for integration of wind. The Tehachapi Transmission Project to integrate 4,500 MW of renewable wind energy has since been approved after

207

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

208

Transmission Investment Incentives  

Science Conference Proceedings (OSTI)

This report documents the use of agent-based simulation as a tool for studying transmission investment incentives, and it is meant to illuminate what accounts for the difficulties in aligning incentives for enhancing the transmission system. The report suggests that a new method of calculation for bid optimization be applied to the economic analysis of long-term incentives for transmission investment. This technology can be broadly applied to help negotiators in transmission planning quantify their count...

2006-12-21T23:59:59.000Z

209

Corrugated outer sheath gas-insulated transmission line  

DOE Patents (OSTI)

A gas-insulated transmission line includes two transmission line sections each of which are formed of a corrugated outer housing enclosing an inner high-voltage conductor disposed therein, with insulating support means supporting the inner conductor within the outer housing and an insulating gas providing electrical insulation therebetween. The outer housings in each section have smooth end sections at the longitudinal ends thereof which are joined together by joining means which provide for a sealing fixed joint.

Kemeny, George A. (Pittsburgh, PA); Cookson, Alan H. (Churchill Boro, PA)

1981-01-01T23:59:59.000Z

210

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

cable transmission systems:5 two 500 kV circuits, a high-voltage direct current (HVDC) system and two to serve VI and the HVDC link is expected to be completely retired in 2007. This erosion in transmission / replacement of the HVDC cables (at a cost of $230 million), as well as transmission upgrades on the mainland

211

Hadoop and Pig Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Outline of Tutorial Outline of Tutorial * Hadoop and Pig Overview * Hands-on 1 Hadoop and Pig Overview Lavanya Ramakrishnan Shane Canon Lawrence Berkeley National Lab October 2011 Overview * Concepts & Background - MapReduce and Hadoop * Hadoop Ecosystem - Tools on top of Hadoop * Hadoop for Science - Examples, Challenges * Programming in Hadoop - Building blocks, Streaming, C-HDFS API 3 Processing Big Data * Internet scale generates BigData - Terabytes of data/day - just reading 100 TB can be overwhelming * using clusters of standard commodity computers for linear scalability * Timeline - Nutch open source search project (2002-2004) - MapReduce & DFS implementation and Hadoop splits out of Nutch (2004-2006) 4 MapReduce * Computation performed on large

212

Lighting Group: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview Overview Overview of the Lighting Research Group The Lighting Research Group at Lawrence Berkeley National Laboratory performs research aimed at improving the energy efficiency of lighting systems in buildings and homes, throughout the State of California and across the Nation. The goal is to reduce lighting energy consumption by 50% over twenty years by improving the efficiency of light sources, and controlling and delivering illumination so that it is available, where and when needed, and at the required intensity. Research in the Lighting Group falls into three main areas: Sources and Ballasts, Light Distribution Systems and Controls and Communications. Click on a link below for more information about each of these research areas. Sources and Ballasts investigates next generation light sources, such as

213

Overview | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APS Overview: APS Overview: Introduction APS Systems Map LINAC Booster Synchrotron Storage Ring Insertion Devices Experiment Hall LOMs & Beamlines Overview of the APS The Advanced Photon Source (APS) at the U.S. Department of Energy's Argonne National Laboratory provides this nation's (in fact, this hemisphere's) brightest storage ring-generated x-ray beams for research in almost all scientific disciplines. Photo: Aerial Photo of APS Aerial photo of the Advanced Photon Source These x-rays allow scientists to pursue new knowledge about the structure and function of materials in the center of the Earth and in outer space, and all points in between. The knowledge gained from this research can impact the evolution of combustion engines and microcircuits, aid in the development of new pharmaceuticals, and pioneer nanotechnologies whose

214

Overview | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overview Overview Overview The Asset Revitalization Initiative (ARI) focuses on communicating past efforts and lessons learned from DOE's long history of asset revitalization and focus current and future efforts to improve the efficiency and effectiveness of future land, asset and facility transfer and beneficial reuse. Since the 1950's, DOE and its predecessor agencies have completed 95 transfers of approximately 25,500 acres of land, facilities and other assets for beneficial reuse, including excess fire stations, water treatment plants, water production facilities and other land, assets and facilities that local communities are using to support their civic, economic and social needs. DOE has already supported the cleanup and closure of approximately 90 sites that were involved in US

215

Safety Overview Committee (SOC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Safety Overview Committee (SOC) Charter Safety Overview Committee (SOC) Charter 1. Purpose The Safety Overview Committee establishes safety policies and ad hoc safety committees. 2. Membership Membership will include the following individuals: APS Director APS Division Directors PSC ESH/QA Coordinator - Chair 3. Method The Committee will: Establish safety policies for the management of business within the APS. Create short-term committees, as appropriate, to address safety problems not covered by the existing committee structure. The committee chairperson meets with relevant safety representatives to discuss safety questions. 4. Frequency of Meetings Safety topics and policies normally are discussed and resolved during meetings of the Operations Directorate or the PSC ALD Division Directors. Otherwise, any committee member may request that a meeting be held of the

216

FOIA Process Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process Overview Process Overview The FOIA process begins when requesters file FOIA requests with DOE to obtain agency records. FOIA requests may be filed with DOE; however, the records must be in the Agency's possession and control and must be located after a reasonable search. Agencies are not required to perform additional researches, analyze data, answer written questions or create records. 1. Request Received by FOIA Office  The written request initially goes to the FOIA Officer in the Department's FOIA office in the Office of Information Resources. The requests should be as specific as possible.  Upon receipt, the FOIA Officer must decide within 20 days whether to grant the request

217

ESPC PPA Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ESPC PPA Overview ESPC PPA Overview Tracy Logan Program Analyst 2 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov * OMB/CEQ Memo: "Supporting Energy and Sustainability Goal Achievement Through Efficiency and Deployment of Clean Energy Technology" (August 16, 2011) http://www.whitehouse.gov/sites/default/files/omb/procurement/memo/supporting-energy-and-sustainability-goal-achievement-through- efficiency-and-deployment-of-clean-energy-technology.pdf) - "ESPCs can incorporate purchase of on-site renewable energy, if the result is lower energy consumption and costs to the Government [...] Agencies should [ ] submit to OMB for review all proposals for PPAs entered into under ESPC authority..." * Note: The process for submitting this information to

218

FOIA Process Overview | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOIA Process Overview FOIA Process Overview A Brief Explanation of the FOIA Request Process at DOE FOIA Process Overview More Documents & Publications How to Make a FOIA Request...

219

Safety and Security Enforcement Process Overview | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process Overview Safety and Security Enforcement Process Overview August 1, 2012 This Enforcement Process Overview (EPO) sets forth the processes used by the U.S. Department of...

220

Sandia National Laboratories Overview- small business program...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sandia National Laboratories Overview- small business program Sandia National Laboratories Overview- small business program NMSU, MBA program Sandia National Laboratories Overview-...

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EC Transmission Line Materials  

SciTech Connect

The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

Bigelow, Tim S [ORNL

2012-05-01T23:59:59.000Z

222

Section J  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

L-1 L-1 Section J Appendix L MEMORANDUM FROM DAVID R. HILL, GENERAL COUNSEL, DATED NOVEMBER 30, 2006, SUBJECT: ONGOING LICENSING SUPPORT NETWORK ("LSN") OBLIGATIONS Contract No.: DE-RW0000005 QA:QA J-L-2 Contract No.: DE-RW0000005 QA:QA J-L-3 Contract No.: DE-RW0000005

223

Automated manual transmission controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

224

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

225

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications 2013 Transmission Reliability Program Peer Review - Day 1...

226

Definition: Transmission Service Provider | Open Energy Information  

Open Energy Info (EERE)

Transmission Service Provider The entity that administers the transmission tariff and provides Transmission Service to Transmission Customers under applicable...

227

A fuel cell overview  

SciTech Connect

This paper is an overview of the fuel cell as an efficient and environmentally benign energy conversion technology. The topics of the paper include their physical arrangement, types of fuel cells, status of commercial development, applications of the fuel cell power plants and comparison with existing alternatives, and good design practice for fuel cell safety.

Krumpelt, M. [Argonne National Lab., IL (United States); Reiser, C.

1994-10-01T23:59:59.000Z

228

ASHRAE Research PROGRAM OVERVIEW  

E-Print Network (OSTI)

ASHRAE Research PROGRAM OVERVIEW November 8, 2011 Michael R. Vaughn, P.E. Manager, Research and Technical Services MORTS@ashrae.net #12;What we will cover · Introduction to ASHRAE Research · ASHRAE's Strategic Plan for Research · Research and Objectives related to Heat Pumps · GSHP System at ASHRAE HQ

Oak Ridge National Laboratory

229

Section 64  

NLE Websites -- All DOE Office Websites (Extended Search)

Do Clouds Mitigate the Biological Effects of Ozone Do Clouds Mitigate the Biological Effects of Ozone Depletion in the Antarctic? P. Ricchiazzi, C. Gautier, and S. Yang Institute for Computational Earth System Science University of California, Santa Barbara Introduction Method Recent studies have shown that biological production in the To distinguish the cloud effect from the strong modulating maritime Antarctic is affected by the ratio of irradiance in the effects of the total ozone, we developed a retrieval technique UVB band to that in the UVA or PAR radiation bands (Smith which simultaneously retrieves column ozone and cloud and Cullen 1995). This result is consistent with the idea that opacity. The retrieval technique is based on the idea that the overall productivity is determined by how well the atmospheric transmission for pass-bands in the UVA and

230

Section 48  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Comparison of Water Vapor Data at the Southern Great Plains Site and its Implications for Water Vapor Continuum Absorption in the Near-Infrared During the ARM Enhanced Shortwave Experiment Period A. M. Vogelmann, V. Ramanathan and W. C. Conant Center for Atmospheric Sciences and Center for Clouds, Chemistry and Climate Scripps Institution of Oceanography La Jolla, California Introduction ARESE Data and Modeling Several studies find that the observed atmospheric solar Narrowband water vapor transmission and aerosol optical absorption is systematically greater than that computed by depths are retrieved from direct beam irradiances measured by models in clear skies (Wild et al. 1995; Charlock and Alberta the Multifilter Rotating Shadow-band Radiometer (MFRSR)

231

Section 66  

NLE Websites -- All DOE Office Websites (Extended Search)

CFCl CFCl 3 ) (CF 2 Cl 2 ) (CHFCl 2 ) CF 4 CCl 4 (CFCl 3 ) (CF 2 Cl 2 ) (CHFCl 2 ) SF 6 CF 4 CCl 4 Session Papers 277 Figure 1. Spectral absorption cross-sections of CF 4 between 1281 and 1284 cm . The experimental -1 conditions correspond to the surface, 5-km, and 19-km levels of the U.S. Standard Atmosphere. Figure 2. Spectral absorption cross-sections of CCl 4 between 755 and 810 cm . The experimental conditions -1 correspond to the surface, 5-km, and 19-km levels of the U.S. Standard Atmosphere. Laboratory Spectroscopy in Support of the Atmospheric Radiation Measurement Program P. Varanasi Institute for Terrestrial and Planetary Atmospheres The University at Stony Brook Stony Brook, New York There is considerable world-wide interest in the remote sensing of chlorofluorocarbons (CFCs), especially CFC-11

232

Colorado/Transmission/State Data | Open Energy Information  

Open Energy Info (EERE)

Data Data < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission State Data Roadmap State Data Regulatory Overview General Print PDF Under DevelopmentThis page is part of the redesign of the Regulatory Roadmap. Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution. State Siting Act None State Preemptive Authority The CPUC has backstop authority only. If a permit is denied by the local government, the applicant may appeal to the CPUC if certain conditions are met (CRS 29-20-108).

233

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

234

Charging and Transport of Aerosols near AC Transmission Lines: A Literature Review  

Science Conference Proceedings (OSTI)

It has been hypothesized that the charging of airborne pollutant particles by alternating current (AC) transmission lines results in enhanced deposition and retention of these particles in the respiratory tract. This report provides an overview of the effect of AC transmission line corona on ion formation and the transfer of charge to aerosols. A literature review identified gaps in the information required to model the charging of aerosols by AC transmission lines and their dispersal downwind, so that e...

2003-12-08T23:59:59.000Z

235

Transmission Infrastructure: FERCs Role  

U.S. Energy Information Administration (EIA) Indexed Site

Transmission Incentives Transmission Incentives Transmission Incentives P. Kumar Agarwal P. Kumar Agarwal Acting Director, Division of Reliability & Acting Director, Division of Reliability & Engineering Services Engineering Services Federal Energy Regulatory Commission Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration U.S. DOE, Energy Information Administration 2009 Energy Conference 2009 Energy Conference Washington, DC Washington, DC April 7, 2009 April 7, 2009 2 2 History History   Energy Policy Act of 2005, August 5, Energy Policy Act of 2005, August 5, 2005 2005 - - Created FPA Section 219 Created FPA Section 219   FERC issued order No. 679 on July 20, FERC issued order No. 679 on July 20, 2006 adopting regulations to promote 2006 adopting regulations to promote

236

Overview | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Overview | National Nuclear Security Administration Overview | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Overview Home > About Us > Our Programs > Defense Programs > Future Science & Technology Programs > Office of Advanced Simulation and Computing and Institutional R&D Programs > About ASC > Overview Overview

237

Video Transmission Jerkiness Measure.  

E-Print Network (OSTI)

??Digital video transmission is widely used nowadays in multimedia. Frame dropping, freeze and reduced number of frames in the transmitted video are common symptoms of (more)

Abdelsamad, Deena

2013-01-01T23:59:59.000Z

238

NIST Transmission SEM  

Science Conference Proceedings (OSTI)

... As a result, more electrons will scatter, to provide the ... RR Keller, "Transmission EBSD in the Scanning Electron Microscope," Microscopy Today vol. ...

2013-07-29T23:59:59.000Z

239

Patterns of transmission investment  

E-Print Network (OSTI)

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

240

SECTION J  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

J-F-1 SECTION J APPENDIX F CRITICAL STAFF Subject Matter Expert Subject Matter Canister Transfer Machine Engineering Waste Package Transfer Trolley Engineering Transport and Emplacement Vehicle Engineering Cask Transfer Trolley Engineering Criticality and Nuclear Engineering Subsurface Thermal Management Engineering Pre-closure Safety Analysis Specialist Waste Package and Drip Shields Engineering Waste Package Closure System Engineering NOG-1 Cranes Engineering Subsurface Design Engineering Structural Seismic Design Engineering Transport, Aging, and Disposal (TAD) interface with repository systems Note: The Contractor shall identify names of at least one individual which shall function in each of the subject matter areas identified above. Qualification requirements for these individuals are

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

SECTION J  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D-1 D-1 SECTION J APPENDIX D KEY PERSONNEL Name Position Doug Cooper General Manager John Donnell Repository Licensing Lead Al Ebner, PE, PhD Repository Design Lead Steve Piccolo Deputy General Manager Steve White Quality & Performance Assurance Lead George Clare Project Management & Integration Lead Mike Hitchler Preclosure Safety Analysis Lead Contract No.: DE-RW0000005 QA:QA J-D-2 POSITION DESCRIPTIONS OCRWM SPECIFIED KEY PERSONNEL 1. General Manager: Requires 10 years experience as a Senior Manager, responsible for the licensing and/or design and/or operation of a large complex nuclear facility. Must have experience as a

242

Microsoft Word - 2006_HFMRF_Overview.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

HFMRF Overview HFMRF Overview Section 2-3-1 High-Field Magnetic Resonance Facility The High-Field Magnetic Resonance Facility (HFMRF) brings a powerful synergy of creative scientific staff and unique instrumentation to bear on complex scientific problems. HFMRF is equipped with state-of-the-art nuclear magnetic resonance (NMR) and pulsed electron paramagnetic resonance (EPR) instruments, all of which play a role in determining molecular structures that are relevant to environmental remediation efforts, materials development for national energy needs, and biological health effects. HFMRF offers unique tools and techniques designed in-house to enable novel research, including 1) in situ catalysis probes, 2) radionuclide NMR capabilities, 3) solid-state NMR cryogenic probes for direct

243

Microsoft Word - 2006 CPCS_Overview.DOC  

NLE Websites -- All DOE Office Websites (Extended Search)

CPCS Overview CPCS Overview Section 2-1-1 Chemistry and Physics of Complex Systems Facility The Chemistry and Physics of Complex Systems (CPCS) Facility supports the U.S. Department of Energy (DOE) mission of fostering fundamental research in the natural sciences to provide the basis for new and improved energy technologies and for understanding and mitigating the environmental impacts of energy use and contaminant releases. This research provides a foundation for understanding interactions of atoms, molecules, and ions with materials and with photons and electrons. Particular emphasis is on interfacial processes. A distinguishing feature of research at national laboratories is their approach to problem solving. Significant scientific issues are addressed using focused and multidisciplinary

244

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

245

Section 24  

NLE Websites -- All DOE Office Websites (Extended Search)

8)&J 8)&J exp (",8) ' k(",8)J k(",8) '2B "& 0 f(N)sinNdN J(8) ' Q ext (8,r)S(r)dr J(8)f(N,8) ' Q N (8,N,r)S(r)dr J exp (8,") ' Q(8,",r)S(r)dr Q(8,",r)' Q ext (8,r)&2B "& 0 Q N (8,N,r)sinNdN Session Papers 105 (1) (2) (3) (4) (5) (6) Estimations of Cloud Particle's Effective Radii from Ground-Based Measurements of Solar Radiation Transmission by Semi-Transparent Clouds G. S. Golitsyn, P. P. Anikin, and M. A. Sviridenkov Institute of Atmospheric Physics, Russian Academy of Sciences Moscow, Russia Introduction Effective radius of cloud particles (i.e., the ratio of third to second moment of size distribution) is an important parameter, which enables to estimate optical characteristics of clouds and, comparing with optical depth, the liquid (crystal)

246

Section 27  

NLE Websites -- All DOE Office Websites (Extended Search)

0.2 0.2 0.4 0.6 0.8 1 0.9 0.92 0.94 0.96 0.98 1 Clear Sky Transmittance θ θ o =60 o from TOA to surface from TOA to 0.5 km from TOA to 5 km from TOA to 1 km Transmittance wavelength ( µ µm) 0transmission spectra for solar zenith angle 2 = 60°. From the top: from TOA to 5 km, 0 from TOA to 1 km, from TOA to 0.5 km and, finally, from TOA to surface. (1) Biases in Shortwave Column Absorption in the Presence of Fractal Clouds W. Wiscombe, A. Marshak, A. Davis and R. Cahalan NASA/Goddard Space Flight Center Greenbelt, Maryland Introduction The goal of this study is to understand inter-droplet cloud absorption in horizontally inhomogeneous clouds. In order to minimize the absorption by cloud drops, a spectral band

247

Pathway and Resource Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Pathway and Resource Overview Pathway and Resource Overview Delivering Renewable Hydrogen Workshop - A Focus on Near-Term Applications Mark F. Ruth November 16, 2009 Palm Springs, CA NREL/PR-6A1-47108 National Renewable Energy Laboratory Innovation for Our Energy Future Definition and Presentation Outline Hydrogen pathway analysis is analysis of the total levelized cost (including return on investment), well-to- wheels (WTW) energy use, and WTW emissions for hydrogen production, delivery, and distribution pathways. This presentation focuses on * Pathway analyses using the Macro-System Model (MSM) * Resource and pathway analysis using the Hydrogen Demand and Resource Analysis Tool (HyDRA) * Status of water-electrolysis technology

248

Full Hybrid: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

highlighted Stop/Start button banner graphic: blue bar highlighted Stop/Start button banner graphic: blue bar subbanner graphic: gray bar Overview Button highlighted Starting button Low Speed button Cruising button Passing button Braking button Stopped button OVERVIEW Full hybrids use a gasoline engine as the primary source of power, and an electric motor provides additional power when needed. In addition, full hybrids can use the electric motor as the sole source of propulsion for low-speed, low-acceleration driving, such as in stop-and-go traffic or for backing up. This electric-only driving mode can further increase fuel efficiency under some driving conditions. stage graphic: vertical blue rule Main stage: See through car with battery, engine, generator, power split device, and electric motor visible. The car is stopped at an intersection.

249

Fuel Cell Technologies Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

States Energy Advisory Board (STEAB) States Energy Advisory Board (STEAB) Washington, DC Dr. Sunita Satyapal U.S. Department of Energy Fuel Cell Technologies Program Program Manager 3/14/2012 2 | Fuel Cell Technologies Program Source: US DOE 3/19/2013 eere.energy.gov * Introduction - Technology and Market Overview * DOE Program Overview - Mission & Structure - R&D Progress - Demonstration & Deployments * State Activities - Examples of potential opportunities Outline 3 | Fuel Cell Technologies Program Source: US DOE 3/19/2013 eere.energy.gov Fuel cells - convert chemical energy directly into electrical energy, bypassing inefficiencies associated with thermal energy conversion. Available energy is equal to the Gibbs free energy. Combustion Engines - convert chemical energy into thermal energy and

250

Standard Review Plan Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Framework for EM Projects Critical Decision (CD) Technical Framework for EM Projects Critical Decision (CD) Milestones Review & Approval Standard Review Plan (SRP) E n v i r o n m e n t a l M a n a g e m e n t DOE - EM - SRP - 2010 2nd Edition Overview March 2010 This page intentionally left blank. Standard Review Plan, 2 nd Edition, March 2010 1 Standard Review Plan Overview Technical Framework for EM Projects Critical Decision Milestones Review and Approval The Office of Environmental Management (EM) is responsible for managing the design, construction, operation, and eventual disposition of mission-critical projects/facilities. Coupled with this ongoing mission is the added responsibility for EM to diligently leverage and apply American Recovery and Reinvestment Act (ARRA) funds to accelerate the completion of its

251

Stop/Start: Overview  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Stop/Start button highlighted banner graphic: blue bar Stop/Start button highlighted banner graphic: blue bar subbanner graphic: gray bar Overview button highlighted Driving button Braking button subbanner graphic: gray bar OVERVIEW Stop/Start hybrids are not true hybrids since electricity from the battery is not used to propel the vehicle. However, the Stop/Start feature is an important, energy-saving building block used in hybrid vehicles. Stop/Start technology conserves energy by shutting off the gasoline engine when the vehicle is at rest, such as at a traffic light, and automatically re-starting it when the driver pushes the gas pedal to go forward. stage graphic: vertical blue rule Main stage: See through car with battery, engine, and electric starter/generator visible. Car is stopped at an intersection.

252

Overview - WIPP Effluent Monitoring  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview of the WIPP Effluent Monitoring Program Compliance with Title 40 CFR Part 191, Subpart A Environmental Standards for Management and Storage L. Frank-Supka, D. J. Harward, S. C. Casey May 2005 INTRODUCTION This document provides an overview of the effluent air monitoring activities at the Waste Isolation Pilot Plant (WIPP), in Carlsbad, New Mexico. The WIPP Effluent Monitoring Program is designed to comply with the U.S. Environmental Protection Agency (EPA) radiation protection standards for management and storage of spent nuclear fuel, high-level radioactive waste and transuranic (TRU)-waste at the WIPP. The standards issued by the EPA are contained in Title 40 Code of Federal Regulations (CFR), Part 191, Subpart A. The standards require the

253

OVERVIEW: UNDERGROUND INJECTION  

E-Print Network (OSTI)

collected, edited and integrated large amounts of information to create this technical reference document. During development of the original overview in 1991, the detailed editorial/technical assistance of Tom Belk (Office of Drinking Water), Marc Herman (Supe rfund Branch, Region VIII) an d Marion Yoder (Office of Regional C ounsel, Region VIII) helped to improve the readability of this document. Virginia Rose (Drinking Water Branch) made the original document possible by retyping numerous drafts containing never-ending changes.

unknown authors

2001-01-01T23:59:59.000Z

254

Research reactors - an overview  

SciTech Connect

A broad overview of different types of research and type reactors is provided in this paper. Reactor designs and operating conditions are briefly described for four reactors. The reactor types described include swimming pool reactors, the High Flux Isotope Reactor, the Mark I TRIGA reactor, and the Advanced Neutron Source reactor. Emphasis in the descriptions is placed on safety-related features of the reactors. 7 refs., 7 figs., 2 tabs.

West, C.D.

1997-03-01T23:59:59.000Z

255

Overview and Outlook  

E-Print Network (OSTI)

This report is based on the talk given by the author in the concluding session of the workshop on Canonical Methods in Classical and Quantum General Relativity, held a Bad-Honef, Germany, in September 93. It contains an assessment of the canonical approach in general, an overview of recent developments within the canonical approach based on connections and loops, and some suggestions for future work.

Abhay Ashtekar

1994-03-18T23:59:59.000Z

256

File:03UTCStateEncroachmentOverview.pdf | Open Energy Information  

Open Energy Info (EERE)

UTCStateEncroachmentOverview.pdf UTCStateEncroachmentOverview.pdf Jump to: navigation, search File File history File usage File:03UTCStateEncroachmentOverview.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 25 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:13, 30 August 2012 Thumbnail for version as of 11:13, 30 August 2012 1,275 × 1,650 (25 KB) Jnorris (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 3-UT-c - State Encroachment Overview

257

DOE EAC Electricity Adequacy Report. Transmission Section - September...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Electricity Delivery & Energy Reliability Search form Search Office of Electricity Delivery & Energy Reliability Services Electricity...

258

regulation coexist. Chapter 2 presents an overview of the ·  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

regulation coexist. Chapter 2 presents an overview of the · regulation coexist. Chapter 2 presents an overview of the · Continuing a discussion at the Federal level Chapter 7 industry's historyfrominceptiontoapproximatelywhen presents FERC's role in promoting competitive whole- deregulation and restructuring started. Chapter 3 sale electric power markets and restructuring the man- explains the infrastructure of the industry, detailing its agement, operation, and possibly the ownership of the generating, transmitting, and distributing components. Nation's high voltage bulk power transmission system. It also presents industry-wide statistics depicting how Although the bulk power transmission system does rot restructuring has changed the composition of the in- receive wide public attention, it plays a key role in the

259

The progressive transmission disadvantage  

Science Conference Proceedings (OSTI)

The disadvantage of progressive transmission, compared to transmission in a single step, is analyzed for the high-rate case using a polytope that is self-similar under binary subdivision. This disadvantage is calculated to be 0.3424 dB or 0.057 bit compared ...

M. J. Durst

1997-01-01T23:59:59.000Z

260

GTC Overview Slide  

NLE Websites -- All DOE Office Websites (Extended Search)

NETL-Regional University Alliance NETL-Regional University Alliance Grid Technologies Collaborative (GTC) An integrated industry/university/government research & development group that advances the state of the art in transmission and distribution system power electronics technologies Mission Become a world leader in the development, demonstration, and application of Grid-Scale Power Electronics Devices and Systems Vision An advanced electricity transmission and distribution network that: *Is efficient, reliable, and resilient to disruptions and other contingency events on the power grid *Integrates clean energy generation resources, energy storage capacity, and alternate operational concepts *Delivers the most suitable forms of electricity in the most economic manner to the end-user

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

EIA - The National Energy Modeling System: An Overview 2003  

Gasoline and Diesel Fuel Update (EIA)

The National Energy Modeling System: An Overview 2003 This report provides a summary description of the NEMS which was used to generate the projections of energy production, demand, imports, and prices through the year 2025 for the Annual Energy Outlook 2003. Preface Introduction Overview of NEMS Carbon Dioxide and Methane Emissions Macroeconomic Activity Module International Energy Module Residential Demand Module Commercial Demand Module Industrial Demand Module Transportation Demand Module Electricity Market Module Renewable Fuels Module Oil and Gas Supply Module Natural Gas Transmission and Distribution Module Petroleum Market Module Coal Market Module Bibliography Download the Report NEMS: An Overview 2003 Cover. Need help, contact the National Energy Information Center at 202-586-8800.

262

Section 19  

NLE Websites -- All DOE Office Websites (Extended Search)

Observations and Applications of Data Taken with the Observations and Applications of Data Taken with the Cloud Profiling Radar System J. M. Firda, S. M. Sekelsky, S. P. Lohmeier, R. E. McIntosh Microwave Remote Sensing Laboratory, University of Massachusetts Amherst, Massachusetts Introduction During the past year, the University of Massachusetts' Cloud Profiling Radar System (CPRS) team has been active in collecting and processing data. Participation in several field campaigns has produced new and interesting data sets. A classification software was also developed using rule-based techniques and neural networks to identify cloud particles. This paper describes the activities of CPRS from March of 1995 to March of 1996. In the first section, involvement in field experiments is briefly described. This is followed by a

263

Section Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLE DIRECTIVES Pursuant to the contract clause entitled, "Laws, Regulations, and DOE Directives," the following list of directives is applicable to this contract. List A Pursuant to the contract clause entitled, "Laws, Regulations, and DOE Directives," the Contractor shall comply with the requirements of applicable Federal, State, and local laws and regulations, unless relief has been granted in writing by the appropriate regulatory agency. Omission of any applicable law or regulation from this list does not affect the obligation of the contractor to comply with such law or regulation. Laws & Regulations Title 10 CFR Part 2 Rules of Practice for Domestic Licensing Proceedings and Issuance of Orders

264

SECTION J  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

H-1 H-1 SECTION J APPENDIX H CONTRACT GUIDANCE FOR PREPARATION OF DIVERSITY PLAN This Guidance is to assist the Contractor in understanding the information being sought by the Department for each of the Diversity elements and where these issues may already be addressed in the contract. To the extent these issues are already addressed in the contract, the Contractor need only cross reference the location. Contractor's Workforce The Department's contracts contain clauses on Equal Employment Opportunity (EEO) and Affirmative Action (AA). The Plan may discuss how the contractor has or plans to establish and maintain result-oriented EEO and AA programs in accordance with the requirements of these clauses, and how the contractor's organization includes

265

Section J  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

M-1 M-1 Section J Appendix M Key Design, Licensing and Site Management M&O Milestone Chart Activity Planned Date Develop and Submit CD-2 (25%-30%) 08/2009 Submission of Construction Performance Specifications - Balance of Plant Support Facilities (OCRWM Start of Construction 3/2012) TBD Submission of Construction Performance Specifications - Initial Handling Facility (IHF) (OCRWM Start of Construction for IHF: 9/2013) TBD Submission of Construction Performance Specifications - Wet Handling Facility (WHF) (OCRWM Start of Construction for WHF: 12/2012) TBD Submission of Construction Performance Specifications - Canister Receipt and Closure Facility (CRCF) (OCRWM Start of Construction for CRCF-1: 10/2011) TBD Submission of Construction Performance Specifications - Panel 1

266

Request for Proposals for New or Upgraded Transmission Line Projects...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012...

267

Nonlinear magnetoinductive transmission lines  

E-Print Network (OSTI)

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent cap...

Lazarides, Nikos; Tsironis, G P

2011-01-01T23:59:59.000Z

268

FOR ELECTRIC POWER TRANSMISSION  

E-Print Network (OSTI)

A contract network extends the concept of a contract path to address the problem of loop flow and congestion in electric power transmission systems. A contract network option provides a well defined, internally consistent framework for assigning long-term capacity rights to a complicated electric transmission network. The contract network respects the special conditions induced by Kirchoff's Laws; accommodates thermal, voltage and contingency constraints on transmission capacity; and can be adopted without disturbing existing methods for achieving an economic power dispatch subject to these constraints. By design, a contract network would maintain short-run efficiency through optimal spot price determination of transmission prices. Through payment of congestion rentals, the contract network makes a long-term capacityright holder indifferent between delivery of the power or receipt of payments in a settlement system. And the contract network framework can support allocation of transmission capacity rights through a competitive bidding process. CONTRACT NETWORKS

William W. Hogan; William W. Hogan

1990-01-01T23:59:59.000Z

269

Transmission line environmental assessment guidance document  

Science Conference Proceedings (OSTI)

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

270

* Intellectual Property Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

* national security technologies classified or sensitive under Section 148 of the Atomic Energy Act (42 U.S.C. 2168); and * inventions made under any agreement, contract or...

271

Human Accelerator - Teacher Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

electrons. The cavities are arranged in two long, straight sections called Linear Accelerators. In this activity, students pass tennis balls down a line like Jefferson Lab's...

272

EIS-0421: Big Eddy-Knight Transmission Line | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21: Big Eddy-Knight Transmission Line 21: Big Eddy-Knight Transmission Line EIS-0421: Big Eddy-Knight Transmission Line Overview BPA is proposing to build a new 500 kilovolt (kV) transmission line in Wasco County, Oregon and Klickitat County, Washington and a new substation in Klickitat County. The new BPA transmission line would extend generally northeast from BPA's existing Big Eddy Substation in The Dalles, Oregon, to a new substation (Knight Substation) proposed to be connected to an existing BPA line about 4 miles northwest of Goldendale, Washington. The proposed Big Eddy Knight Transmission Project is needed to increase transmission capacity to respond to requests for transmission service in this area. Public Comment Opportunities No public comment opportunities available at this time.

273

Model documentation: Natural Gas Transmission and Distribution Model of the National Energy Modeling System; Volume 1  

SciTech Connect

The Natural Gas Transmission and Distribution Model (NGTDM) is a component of the National Energy Modeling System (NEMS) used to represent the domestic natural gas transmission and distribution system. NEMS is the third in a series of computer-based, midterm energy modeling systems used since 1974 by the Energy Information Administration (EIA) and its predecessor, the Federal Energy Administration, to analyze domestic energy-economy markets and develop projections. This report documents the archived version of NGTDM that was used to produce the natural gas forecasts used in support of the Annual Energy Outlook 1994, DOE/EIA-0383(94). The purpose of this report is to provide a reference document for model analysts, users, and the public that defines the objectives of the model, describes its basic design, provides detail on the methodology employed, and describes the model inputs, outputs, and key assumptions. It is intended to fulfill the legal obligation of the EIA to provide adequate documentation in support of its models (Public Law 94-385, Section 57.b.2). This report represents Volume 1 of a two-volume set. (Volume 2 will report on model performance, detailing convergence criteria and properties, results of sensitivity testing, comparison of model outputs with the literature and/or other model results, and major unresolved issues.) Subsequent chapters of this report provide: (1) an overview of the NGTDM (Chapter 2); (2) a description of the interface between the National Energy Modeling System (NEMS) and the NGTDM (Chapter 3); (3) an overview of the solution methodology of the NGTDM (Chapter 4); (4) the solution methodology for the Annual Flow Module (Chapter 5); (5) the solution methodology for the Distributor Tariff Module (Chapter 6); (6) the solution methodology for the Capacity Expansion Module (Chapter 7); (7) the solution methodology for the Pipeline Tariff Module (Chapter 8); and (8) a description of model assumptions, inputs, and outputs (Chapter 9).

NONE

1994-02-24T23:59:59.000Z

274

2006 National Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study 6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor). Based on the 2006 study, two National Interest Electric Transmission Corridors were designated in 2007. These were invalidated by a federal appeals court in

275

EIA - The National Energy Modeling System: An Overview 2003-Natural Gas  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Transmission and Distribution Module Natural Gas Transmission and Distribution Module The National Energy Modeling System: An Overview 2003 Natural Gas Transmission and Distribution Module Figure 15. Natural Gas Transmission and Distribution Module Structure. Need help, contact the National Energy Information Center at 202-586-8800. Figure 16. Natural Gas Transmission and distribution Module Network. Need help, contact the National Energy Information Center at 202-586-8800. Natural Gas Transmission and distribution Module Table. Need help, contact the National Energy Information Center at 202-586-8800. The natural gas transmission and distribution module (NGTDM) of NEMS represents the natural gas market and determines regional market–clearing prices for natural gas supplies and for end–use consumption, given the

276

Microsoft Word - 2006_Overview.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Section 1-1-1 Overview This 2006 EMSL Annual Report describes the research and accomplishments of staff and users of the William R. Wiley Environmental Molecular Sciences Laboratory (EMSL), located in Richland, Washington. Mission EMSL, a national scientific user facility at Pacific Northwest National Laboratory (PNNL), provides integrated experimental and computational resources for discovery and technological innovation in the environmental molecular sciences to support the needs of DOE and the nation. EMSL strives for simultaneous excellence in 1) high-impact science and marquee capabilities, 2) outstanding management and operations, and 3) exceptional user outreach and services, and uses these tenets to deliver its mission and implement its strategy. The

277

Renewables Portfolio Standard Overview  

DOE Green Energy (OSTI)

A Renewables Portfolio Standard (RPS) is a requirement on electric utilities and other electric suppliers to supply a minimum percentage or amount of their load with eligible sources of renewable energy. The RPS has become increasingly popular because of its benefits and the public benefits of renewable energy. A well-designed state RPS can effectively deliver a renewable energy supply and associated benefits, at a low cost or even with consumer savings. This fact sheet provides an overview of an effective RPS design.

Not Available

2005-02-01T23:59:59.000Z

278

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

279

May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 29 Tribal Renewable Energy Webinar to Highlight Regional May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 24, 2013 - 3:41pm Addthis The U.S. Department of Energy Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series webinar, "Regional Transmission Planning," on Wednesday, May 29, 2013, from 1:00 p.m. to 2:30 p.m. Eastern Time. Speakers from WAPA's Rocky Mountain Region, its Upper Great Plains Region, and WestConnect will provide an overview of various interconnection-based regional transmission planning efforts. Helpful background information on

280

May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 29 Tribal Renewable Energy Webinar to Highlight Regional May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 24, 2013 - 3:41pm Addthis The U.S. Department of Energy Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series webinar, "Regional Transmission Planning," on Wednesday, May 29, 2013, from 1:00 p.m. to 2:30 p.m. Eastern Time. Speakers from WAPA's Rocky Mountain Region, its Upper Great Plains Region, and WestConnect will provide an overview of various interconnection-based regional transmission planning efforts. Helpful background information on

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Geothermal Energy Program Technology Overview  

DOE Green Energy (OSTI)

New fact sheets for the DOE Office of Power Technologies (OPT) that provide technology overviews, description of DOE programs, and market potential for each OPT program area.

Not Available

2001-11-01T23:59:59.000Z

282

Utility Partnerships Program Overview (Brochure)  

Science Conference Proceedings (OSTI)

Program overview brochure for the Utility Partnerships Program within the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP).

Not Available

2011-07-01T23:59:59.000Z

283

Center for Transportation Analysis Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Center for Transportation Analysis Overview The mission of the Center for Transportation Analysis (CTA) at Oak Ridge National Laboratory (ORNL) is to provide solutions for assuring...

284

Central Appalachian Coal Futures Overview  

U.S. Energy Information Administration (EIA)

Central Appalachian Coal Futures Overview In 1996, the New York Mercantile Exchange (NYMEX) began providing companies in the electric power industry with secure and ...

285

ARM Orientation: Overview and History  

NLE Websites -- All DOE Office Websites (Extended Search)

and History Overview and History Mar 2007 ARM Orientation 2 ARM ARM Atmospheric Radiation Measurement Atmospheric Radiation Measurement ARM Chief Scientist Team ARM Chief...

286

Down hole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

287

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

288

Transmission Electron Microscopy (TEM)  

Science Conference Proceedings (OSTI)

...Transmission electron microcopy (TEM) has been used since the 1950s to obtain very high resolution images of microstructures. As TEMs were enhanced to include features such as digitally scanned point beams and energy dispersive x-ray detectors

289

Designing electricity transmission auctions  

E-Print Network (OSTI)

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

290

Downhole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2008-01-15T23:59:59.000Z

291

Cloud Transmissivities for Canada  

Science Conference Proceedings (OSTI)

Transmissivities are determined for different cloud types using nine years of hourly irradiance measurements under overcast skies at six Canadian stations. Values for individual stations and for pooled data using irradiances uncorrected for ...

J. A. Davies; M. Abdel-Wahab; J. E. Howard

1985-03-01T23:59:59.000Z

292

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

293

Superconductivity Program Overview High-Temperature Superconductivity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SuperconducTiviTy program haS Three FocuS areaS: SuperconducTiviTy program haS Three FocuS areaS: SuperconducTiviTy applicaTionS Developing HTS-based electric power equipment such as transmission and distribution cables and fault current limiters Second-generaTion Wire developmenT Developing high-performance, low-cost, second- generation HTS wire at long lengths STraTegic reSearch Supporting fundamental research activities to better understand relationships between the microstructure of HTS materials and their ability to carry large electric currents over long lengths Superconductivity Program Overview High-Temperature Superconductivity for Electric Systems Office of Electricity Delivery and Energy Reliability www.oe.energy.gov Office of Electricity Delivery and Energy Reliability, OE-1 U.S. Department of Energy - 1000 Independence Avenue, SW - Washington, DC 20585

294

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

295

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

296

Workshop title: Transmission and Utility Scale Solar Opportunities "South of Phoenix" (or should we say "in Arizona" if we inc  

NLE Websites -- All DOE Office Websites (Extended Search)

Purpose: A stakeholder communication with transmission customers, Tribes, developers, state Purpose: A stakeholder communication with transmission customers, Tribes, developers, state and federal agencies, and utilities about Western Area Power Administration's (Western) Rocky Mountain Region (RMR) and its Transmission Planning and Business Unit. The workshop will provide an overview of Western RMR's transmission planning and services and provide an opportunity for open discussion on overcoming transmission challenges in the region. The workshop will also meet the local transmission planning process requirements for FERC Order 890 as outlined in Western's Open Access Transmission Tariff.

297

Overview of Recovery Act FAR Clauses  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act FAR Clauses Recovery Act FAR Clauses The Table below provides a brief overview of the FAR clauses in FAC 2005-32. These clauses and H.999 Special provisions relating to work funded under American Recovery and Reinvestment Act of 2009 must be incorporated into all contracts and orders that will have Recovery Act funds. ARRA Requirement Clause Number Prescription 52.225-21 Include in Recovery Act funded contracts for construction projects under $7,443,000 - replaces 52.225-9 52.225-22 Include if using 52.225-21 - replaces 52.225-10 52.225-23 Include Recovery Act funded contracts for construction projects of $7,443,000 or more - replaces 52.225-11 Section 1605 Buy American 52.225-24 Include if using 52.225-23 - replaces 52.225-12 Section 1552 Whistleblower

298

Definition: Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Jump to: navigation, search Dictionary.png Transmission An interconnected group of lines and associated equipment for the movement or transfer of electric energy...

299

An overview of U.S. decommissioning experience -- A basic introduction  

Science Conference Proceedings (OSTI)

This paper presents an overview of the US experiences in the decommissioning technical area. Sections included are: (1) an overview of the magnitude of the problem, (2) a review of the US decommissioning process, (3) regulation of decommissioning, (4) regulatory and funding requirements for decommissioning, and (5) a general overview of all on-going and completed decommissioning projects to date in the US. The final section presents a review of some issues in the decommissioning area currently being debated in the technical specialists community.

Boing, L.E.

1998-03-09T23:59:59.000Z

300

National Electric Transmission Congestion Study 2006 Executive Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EXECUTIVE EXECUTIVE SUMMARY AUGUST 2006 U.S. Department of Energy NATIONAL ELECTRIC TRANSMISSION CONGESTION STUDY EXECUTIVE SUMMARY AUGUST 2006 U.S. Department of Energy Executive Summary Section 1221(a) of the Energy Policy Act of 2005 amended the Federal Power Act (FPA) by adding a new section 216 to that Act. FPA section 216(a) di- rected the Secretary of Energy to conduct a nation- wide study of electric transmission congestion 1 by August 8, 2006. Based upon the congestion study, comments thereon, and considerations that include economics, reliability, fuel diversity, national en- ergy policy, and national security, the Secretary may designate "any geographic area experiencing electric energy transmission capacity constraints or congestion that adversely affects customers as a na- tional interest electric transmission corridor." The national congestion study

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Power Electronics-Based Transmission Controllers Reference Book  

Science Conference Proceedings (OSTI)

EPRI is sponsoring development of a first edition of the EPRI Power Electronics-Based Transmission Controllers Reference Book. The book will provide a broad overview on power electronics-based controllerswith information on historical perspectives, basic design considerations, factory testing, site installations, commissioning, operating performance, operation and maintenance, and future trends. The document will assist users in planning, developing, installing, and utilizing this technology.

2005-12-02T23:59:59.000Z

302

Interconnection Transmission Planning: Awards | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and...

303

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

ColoradoTransmissionAgencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary...

304

Hydrogen Storage- Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

- - Overview George Thomas, Hydrogen Consultant to SNL * and Jay Keller, Hydrogen Program Manager Sandia National Laboratories H 2 Delivery and Infrastructure Workshop May 7-8, 2003 * Most of this presentation has been extracted from George Thomas' invited BES Hydrogen Workshop presentation (May 13-14, 2003) Sandia National Laboratories 4/14/03 2 Sandia National Laboratories From George Thomas, BES workshop 5/13/03 H 2 storage is a critical enabling technology for H 2 use as an energy carrier The low volumetric density of gaseous fuels requires a storage method which compacts the fuel. Hence, hydrogen storage systems are inherently more complex than liquid fuels. Storage technologies are needed in all aspects of hydrogen utilization. production distribution utilization

305

Partnership Overview and Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

Phase III Field Test Phase III Field Test Overview and Summary RCSP Initiative Annual Review Meeting Pittsburgh, PA October 6 - 8, 2008 Presented by Brian J. McPherson Southwest Regional Partnership on Carbon Sequestration New Mexico Tech 2 Southwest Regional Partnership on Carbon Sequestration Acknowledgements * Many thanks to the U.S. Department of Energy and NETL for supporting this project * We express our gratitude also to our many industry partners, who have committed a great deal of time, funding and other general support for these projects * The work presented today is co-authored by all partners in the Southwest Partnership 3 Southwest Regional Partnership on Carbon Sequestration * Phase II - Phase III Integration * Summary of Phase III Project * location * site characterization

306

Chemical Storage-Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Storage - Storage - Overview Ali T-Raissi, FSEC Hydrogen Storage Workshop Argonne National Laboratory, Argonne, Illinois August 14-15, 2002 Hydrogen Fuel - Attributes * H 2 +½ O 2 → H 2 O (1.23 V) * High gravimetric energy density: 27.1 Ah/g, based on LHV of 119.93 kJ/g * 1 wt % = 189.6 Wh/kg (0.7 V; i.e. η FC = 57%) * Li ion cells: 130-150 Wh/kg Chemical Hydrides - Definition * They are considered secondary storage methods in which the storage medium is expended - primary storage methods include reversible systems (e.g. MHs & C-nanostructures), GH 2 & LH 2 storage Chemical Hydrides - Definition (cont.) * The usual chemical hydride system is reaction of a reactant containing H in the "-1" oxidation state (hydride) with a reactant containing H in the "+1" oxidation

307

National Climate Assessment: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Production Team Production Team Indicators System Coastal Resilience Resources Make Our Science Accessible Link Climate Change & Health Provide Data and Tools Coordinate Internationally National Climate Assessment: Overview Print E-mail What is the National Climate Assessment (NCA)? The NCA is an important resource for understanding and communicating climate change science and impacts in the United States. It informs the nation about already observed changes, the current status of the climate, and anticipated trends for the future. The NCA report process integrates scientific information from multiple sources and sectors to highlight key findings and significant gaps in our knowledge. The NCA also establishes consistent methods for evaluating climate impacts in the U.S. in the context of broader global change. Finally, findings from the NCA provide input to Federal science priorities and are used by U.S. citizens, communities, and businesses as they create more sustainable and environmentally sound plans for the nation's future.

308

Technical Reference OVERVIEW  

NLE Websites -- All DOE Office Websites (Extended Search)

Parking and the ENERGY STAR Score in the United States and Canada Page 1 Parking and the ENERGY STAR Score in the United States and Canada Page 1 Parking and the ENERGY STAR Score in the United States and Canada Technical Reference OVERVIEW The ENERGY STAR score provides a fair assessment of the energy performance of a property relative to its peers, taking into account the climate, weather, and business activities at the property. Parking areas are not eligible to earn the ENERGY STAR score. However, because parking is a common amenity at other commercial building types (i.e., office and hotels), the ENERGY STAR score does make adjustments to accommodate for the presence of parking.

309

Fuel Cell Technologies Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

4/3/2012 4/3/2012 eere.energy.gov Fuel Cell Technologies Overview Flow Cell Workshop Washington, DC Dr. Sunita Satyapal & Dr. Dimitrios Papageorgopoulos U.S. Department of Energy Fuel Cell Technologies Program 3/7/2011 Flow Cells for Energy Storage Workshop Purpose To understand the applied research and development needs and the grand challenges for the use of flow cells as energy-storage devices. Objectives 1. Understand the needs for applied research from stakeholders. 2. Gather input for future development of roadmaps and technical targets for flow cells for various applications. 3. Identify grand challenges and prioritize R&D needs. Flow cells combine the unique advantages of batteries and fuel cells and can offer benefits for multiple energy storage applications.

310

Gasification … Program Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

th th Annual International Colloquium on Environmentally Preferred Advanced Power Generation, Costa Mesa, CA, February 7, 2012 An Overview of U.S. DOE's Gasification Systems Program Jenny B. Tennant Technology Manager - Gasification 2 Gasification Program Goal "Federal support of scientific R&D is critical to our economic competitiveness" Dr. Steven Chu, Secretary of Energy November 2010 The goal of the Gasification Program is to reduce the cost of electricity, while increasing power plant availability and efficiency, and maintaining the highest environmental standards 3 U.S. Coal Resources Low rank: lignite and sub-bituminous coal - About 50% of the U.S. coal reserves - Nearly 50% of U.S. coal production - Lower sulfur Bituminous coal

311

Partnership Overview and Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

SWP Phase 3 Deployment Project: SWP Phase 3 Deployment Project: Overview and Summary Brian McPherson and Reid Grigg RCSP Annual Review Meeting October 5-7, 2010 Pittsburgh, PA 2 Acknowledgements * Many thanks to the U.S. Department of Energy and NETL for supporting this project * We express our gratitude also to our many industry partners, who have committed a great deal of time, funding and other general support for these projects * The work presented today is co-authored by all partners in the Southwest Partnership 3 Southwest Regional Partnership In all partner states: * major universities * geologic survey * other state agencies * over 50 partners as well as * Western Governors Association * five major utilities * seven energy companies * three federal agencies * the Navajo Nation * many other critical partners

312

Full Hybrid: Overview  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

highlighted Starting button Low Speed button Cruising button Passing button Braking button Stopped button highlighted Starting button Low Speed button Cruising button Passing button Braking button Stopped button OVERVIEW Full hybrids use a gasoline engine as the primary source of power, and an electric motor provides additional power when needed. In addition, full hybrids can use the electric motor as the sole source of propulsion for low-speed, low-acceleration driving, such as in stop-and-go traffic or for backing up. This electric-only driving mode can further increase fuel efficiency under some driving conditions. stage graphic: vertical blue rule Main stage: See through car with battery, engine, generator, power split device, and electric motor visible. The car is stopped at an intersection. Main stage: See through car with battery, engine, generator, power split device, and electric motor visible. The car is stopped at an intersection.

313

Electricity Transmission, A Primer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

314

2009 National Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 National Electric Transmission Congestion Study 9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor). The 2009 study is the second Congestion Study that the Department conducted. The first Congestion Study was conducted in 2006. Preparations

315

SAMS Overview | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Materials Management & Safeguards System > SAMS Overview SAMS Overview U.S. Department of Energy U.S. Nuclear Regulatory Commission Nuclear Materials Management & Safeguards...

316

Risk Management Process Overview | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cybersecurity Risk Management Process Risk Management Process Overview Risk Management Process Overview figure depicting three tier risk management process The cybersecurity...

317

Superconductivity Program Overview | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Overview Superconductivity Program Overview High-Temperature Superconductivity (HTS) has the potential for achieving a more fundamental change to electric power...

318

Overview of Geothermal Energy Development Webcast | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home Overview of Geothermal Energy Development Webcast Overview of Geothermal Energy Development Webcast...

319

Oak Ridge ARI Overview | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Centers Field Sites Power Marketing Administration Other Agencies You are here Home Oak Ridge ARI Overview Oak Ridge ARI Overview This fact sheet covers the asset...

320

Smart Grid Overview | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Grid Overview Smart Grid Overview Presentation-given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting-discusses the Smart Grid including the...

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

NERSC/DOE HPC Requirements Workshops Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview NERSC HPC Program Requirements Reviews Overview Scope These workshops are focused on determining the computational challenges facing research teams and the computational...

322

Renewable Energy Project Overview | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Energy Project Overview Renewable Energy Project Overview Presentation-given at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meeting-covers federal...

323

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

324

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

325

Electric Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

326

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

327

Merchant Transmission Investment  

E-Print Network (OSTI)

merchant transmission model of the type described above, though Australia has adopted a mixed merchant and regu- 6 lated transmission model.3 However, recent academic proposals,4 as well as FERCs July 2002 Standard Market Design (SMD) proposals, call... that a nodal or locational marginal pricing (LMP) system is in place with attributes similar to those being proposed by the U.S. Federal Energy Regulatory Commission (FERC) in its SMD proposals and to what is in operation in New 3Two merchant lines...

Joskow, Paul; Tirole, Jean

2004-06-16T23:59:59.000Z

328

NREL: Energy Analysis: Transmission Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

329

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

330

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

331

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission lines between two adjacent periodic intersections to be longer than the other. 5 figs.

Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; deGrassie, J.S.

1990-03-02T23:59:59.000Z

332

Overview of locking systems  

Science Conference Proceedings (OSTI)

The purpose of this document is to present technical information that should be useful for understanding and applying locking systems for physical protection and control. There are major sections on hardware for locks, vaults, safes, and security containers. Other topics include management of lock systems and safety considerations. This document also contains notes on standards and specifications and a glossary.

Gee, K.T.; Scott, S.H.; Wilde, M.G. [Sandia National Labs., Albuquerque, NM (United States); Highland, S.E. [Albuquerque Safe Co., Albuquerque, NM (United States)

1993-12-01T23:59:59.000Z

333

EIA - Annual Energy Outlook 2007 with Projections to 2030 - Overview  

Gasoline and Diesel Fuel Update (EIA)

Overview Overview Annual Energy Outlook 2007 with Projections to 2030 Energy Trends to 2030 EIA, in preparing projections for the AEO2007, evalu-ated a wide range of trends and issues that could have major implications for U.S. energy markets between today and 2030. This overview focuses on one case, the reference case, which is presented and compared with the AEO2006 reference case (see Table 1). Readers are encouraged to review the full range of alternative cases included in other sections of AEO2007. As in previous editions of the Annual Energy Outlook (AEO), the reference case assumes that current policies affecting the energy sector remain unchanged throughout the projection period. Some possible policy changes-notably, the adoption of policies to limit or reduce greenhouse gas emissions-could change the reference case projections significantly.

334

Transmission SEAB Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

335

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

1993-01-01T23:59:59.000Z

336

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

337

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

involves the construction of an approximate 1000 mile HVAC and HVDC transmission project from British ACSR. (Northern Segment) b) A 3000 MVA, 500 kV HVAC to +/-500 kV HVDC Converter at the NEO Station. c) A +/-500 kV HVDC line from the NEO Station to the proposed Collinsville Substation in the San Francisco Bay

338

LAP Transmission Rate  

NLE Websites -- All DOE Office Websites (Extended Search)

LAP Transmission Rate 4.50 4.00 3.82 3.50 3.00 of 2.50 c 0 2.I2 2.68 I 3: 2.00 1.50 1.00 0.50 0.00 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012...

339

Transmission Services J7000  

NLE Websites -- All DOE Office Websites (Extended Search)

C T D E S E R T S O U T H W E S T R E G I O N R O C K Y M O U N T A I N R E G I O N Transmission Services J7000 Ensuring the Reliability of the Bulk Electric System Western's...

340

Transmission planning in China  

Science Conference Proceedings (OSTI)

Though China is well along in restructuring its power markets, it still has some way to travel before economic considerations receive adequate weight in transmission planning decisions. Adoption of more sophisticated tools such as multi-agent modeling will help China continue in its progress in achieving this. (author)

Dong, Jun; Zhang, Jing

2009-07-15T23:59:59.000Z

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

342

Omega Transmission Lines  

E-Print Network (OSTI)

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

343

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

Kotlyar, O.M.

1997-03-25T23:59:59.000Z

344

Steps to Establish a Real-Time Transmission Monitoring System for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steps to Establish a Real-Time Transmission Monitoring System for Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western Interconnections Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western Interconnections Steps to establish a real-time transmission monitoring system for transmission owners and operators within the Eastern and Western interconnections: a report to congress pursuant to section 1839 of the Energy Policy Act of 2005. Section 1839 of the Energy Policy Act of 2005 (EPAct 2005) directs the Secretary of Energy (DOE) and the Federal Energy Regulatory Commission (Commission) to study and report to Congress on the steps that must be taken to establish a system to make available to all transmission owners

345

Australasian Section Newsletter  

Science Conference Proceedings (OSTI)

Read the Australasian Section Newsletter. Australasian Section Newsletter Australasian Section aaocs aocs australasian Australasian Sections Australia award awards excellence fats global inform job listings member membership network oils Pacific Rim Prof

346

Part I, DAA Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AODR Role-Based Training AODR Role-Based Training Office of the Chief Information Officer Objectives Gain Understanding and Working Knowledge of: AODR Authority, Role and Responsibilities Key Cyber Security Terms Cyber Security Program Management Structure Policy Hierarchy Risk Management Framework and Certification and Accreditation Process Relationship Pre-AO C&A Package Review Accreditation Forms, Boundaries and Common Controls and Inheritance Accreditation Decision and Package Transmission Continuous Monitoring Office of the Chief Information Officer Who is the AODR?  Authorizing Official Designated Representative (AODR)  AODRs are appointed by the AO  AODR function can be performed by AO  AODR role is not a required role by DOE Order or National policy  If AODR position is appointed it can be filled by one

347

RIA Overview and Status  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Science Office of Science U.S. Department of Energy Guy Savard Argonne National Laboratory & University of Chicago Based on Material presented at the ATLAS Operation's Review December 8-10, 2003 by The Californium Source Upgrade 2 Pioneering Science and Technology Office of Science U.S. Department of Energy 12/8-10/2003 ATLAS Upgrade Guy Savard ATLAS Status * ATLAS only low-energy accelerator for stable ions operating as a User Facility with well documented characteristics (reliability, beam quality, transmission, timing,...) * Excellent and varied physics program with a large User community * What lies ahead for ATLAS * Maintain position as premier low-energy heavy ion accelerator * Address open physics/technical questions leading to RIA * Help the community in the "pre-RIA"

348

Lawrence Berkeley National Laboratory Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Berkeley National Laboratory Berkeley National Laboratory Overview Ashok Gadgil Division Director Environmental Energy Technologies Division May 2011 | LBNL Overview | 2 Berkeley Lab Mission Managed by the University of California for the United States Department of Energy * Solve the most pressing and profound scientific problems facing humankind - Basic science for a secure energy future - Understand living systems to improve the environment and energy supply - Understand matter and energy in the universe * Build and safely operate world-class scientific facilities * Train the next generation of scientists and engineers | LBNL Overview | 3 Founded on the Berkeley campus in 1931, moved to the current site in 1940 | LBNL Overview | 4 Lawrence Introduces Big Team Science LBNL: The First DOE National Laboratory

349

Batteries: Overview of Battery Cathodes  

E-Print Network (OSTI)

Challenges in Future Li-Battery Research. Phil Trans. RoyalBatteries: Overview of Battery Cathodes Marca M. Doeffduring cell discharge. Battery-a device consisting of one or

Doeff, Marca M

2011-01-01T23:59:59.000Z

350

OVERVIEW OF PROPOSED TRANSPORTATION ENERGY  

E-Print Network (OSTI)

OVERVIEW OF PROPOSED TRANSPORTATION ENERGY ANALYSES FOR THE 2007 INTEGRATED ENERGY POLICY REPORT Jim Page, Malachi Weng-Gutierrez, and Gordon Schremp Fossil Fuels Office Fuels and Transportation....................................................................................................... 3 SUMMARY OF PROPOSED TRANSPORTATION ENERGY ANALYSES ............... 4 Background

351

AEO2012 Early Release Overview  

Gasoline and Diesel Fuel Update (EIA)

AEO2012 Early Release Overview Total U.S. consumption of liquid fuels, including both fossil fuels and biofuels, grows from 37.2 quadrillion Btu (19.2 million barrels per day)...

352

ICME Case Studies and Overviews  

Science Conference Proceedings (OSTI)

D.G. Backman et al., General Electric. JOM overview of AIM initiative supported by DARPA, 0, 1220, Cathy Rohrer, 2/8/2007 11:40 PM by Cathy Rohrer.

353

Lesson 2: Energy Sources Overview  

E-Print Network (OSTI)

Lesson 2: Energy Sources #12;Overview · Most geologic disasters involve the release of large amounts of energy either quickly or slowly. To understand these processes, we need to know where the energy released was derived from. #12

Chen, Po

354

File:06HIDOtherOverview.pdf | Open Energy Information  

Open Energy Info (EERE)

6HIDOtherOverview.pdf 6HIDOtherOverview.pdf Jump to: navigation, search File File history File usage File:06HIDOtherOverview.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 28 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:25, 23 October 2012 Thumbnail for version as of 11:25, 23 October 2012 1,275 × 1,650 (28 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 6-HI-d - Other Overview Retrieved from "http://en.openei.org/w/index.php?title=File:06HIDOtherOverview.pdf&oldid=528994

355

Depleted UF6 Management Program Overview Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Depleted UF6 Management Program Overview Presentation Cylinders Photo Next Screen A Legacy of Uranium Enrichment...

356

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

357

GRR/Sections | Open Energy Information  

Open Energy Info (EERE)

GRR/Sections GRR/Sections < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Roadmap Coverage The roadmapping initiative covers the states show in green on the map below, including California, Nevada, Hawai'i, Alaska, Idaho, Utah, Oregon, and Montana. The roadmap is being developed at the federal and state levels, allowing for future expansion to the local (county) level. Development of the roadmap for two additional states (Colorado and Texas) is underway for Fiscal Year 2013. Click on a state to view Regulatory Roadmap information specific to that state. List of Roadmap Sections Overview Flowchart The flowcharts listed below were developed as part of the Geothermal Regulatory Roadmap project. The flowcharts cover the major requirements for

358

Transmission Developers Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

359

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

360

Transmission Siting_071508.indd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

A Smarter Transmission Grid  

Science Conference Proceedings (OSTI)

Our modern transmission grid transports bulk power over long distances and across many provincial boundaries, but ever-increasing energy demands are significantly transforming it. Worldwide, many catalysts are driving this transformation, including emerging supply- and demand-side technologies, cyber security concerns, and aging infrastructures, to name just a few. As the grid transforms and more grid-connected renewable resources complicate reliability, it will be increasingly difficult to meet its futu...

2010-12-31T23:59:59.000Z

362

Transmission Price Risk Management  

Science Conference Proceedings (OSTI)

This report is concerned with the financial risks that arise from the uncertain price of transmission service in restructured or competitive electricity markets. These risks are most severe in markets with locational pricing (LMP), but they also exist in more traditionally organized electricity markets. This report has two main purposes. The first is to review the existing mathematical models of electricity price formation in spot and forward markets that may be helpful as the foundations for developing ...

2006-12-04T23:59:59.000Z

363

Green Transmission Efficiency Initiative  

Science Conference Proceedings (OSTI)

As a consequence of escalating interest in the environment and climate changea national focus on energy efficiency, and growing electricity demandthe time is right to assess energy efficiency from both an end-use perspective as well as across the utility value chain, from generation, to transmission, to distribution. The reduction of our carbon footprint and increasing the role of renewable energy are an important part of the strategy for the greening for electric energy supply. As a result, efficient po...

2009-07-31T23:59:59.000Z

364

NWCC Transmission Case Study Conclusions Summary  

DOE Green Energy (OSTI)

OAK-B135 The NWCC Transmission Case Studies Conclusions Summary In the spring of 1999, the Utility Wind Interest Group (UWIG), with the cooperation of the National Wind Coordinating Committee (NWCC), conducted a forum on transmission issues associated with the production of energy from wind. As a result of this forum, a number of issues were identified which, if successfully resolved, could help reduce barriers to the future expansion of wind power. The NWCC, being a multi-stakeholder group, was in an ideal position to conduct follow-up activities among a cross-section of the interested parties. The follow-up activities took the form of three case studies in the areas of interest identified by forum participants: (1) Transmission policy and pricing; (2) ''Virtual wheeling'' arrangements; and, (3) Transmission system improvements. The case studies provide an interesting snapshot in time dealing with a range of issues associated with scheduled or planned regulatory and restructuring proceedings related to energy transmission. The NWCC Transmission Subcommittee and the UWIG reviewed early drafts of the case studies in November 1999. The case studies were conducted through a questionnaire and interview process with interested parties. In writing each case study, NWCC staff attempted to identify all stakeholder groups with an interest in each topic and solicit their input. While all parties do not agree on every issue presented, a serious effort has been made to present all views in an unbiased fashion. At the end of each case study, relevant conclusions are drawn and recommendations for next steps are provided where appropriate.

Steve Wiese, Terry Allison

2000-09-01T23:59:59.000Z

365

The EMMA Accelerator, a Diagnostic Systems Overview  

Science Conference Proceedings (OSTI)

The 'EMMA' Non-Scaling Fixed Field Alternating Gradient (ns-FFAG) international project is currently being commissioned at Daresbury Laboratory, UK. This accelerator has been equipped with a number of diagnostic systems to facilitate this. These systems include a novel time-domain-multiplexing BPM system, moveable screen systems, a time-of-flight instrument, Faraday cups, and injection/extraction tomography sections to analyze the single bunch beams. An upgrade still to implement includes the installation of wall current monitors. This paper gives an overview of these systems and shows some data and results from the diagnostics that have contributed to the successful demonstration of a serpentine acceleration by this novel accelerator.

Kalinin, A.; Berg, J.; Bliss, N. Cox, G.; Dufau, M.; Gallagher, A.; Hill, C.; Jones, J.; Ma, L.; McIntosh, P.; Muratori, B.; Oates, A.; Shepherd B.; Smith, R.; Hock, K.; Holder, D.; Ibison, M., Kirkman I.; Borrell, R.; Crisp, J.; Fellenz, B.; Wendt, M.

2011-09-04T23:59:59.000Z

366

WestConnect Transmission Product  

NLE Websites -- All DOE Office Websites (Extended Search)

WestConnect Transmission Product Federal Register Notices Customer Notifications Customer Comments Approved Rate Order FERC Confirmation...

367

Transmission eigenvalues for elliptic operators  

E-Print Network (OSTI)

A reduction of the transmission eigenvalue problem for multiplicative sign-definite perturbations of elliptic operators with constant coefficients to an eigenvalue problem for a non-selfadjoint compact operator is given. Sufficient conditions for the existence of transmission eigenvalues and completeness of generalized eigenstates for the transmission eigenvalue problem are derived. In the trace class case, the generic existence of transmission eigenvalues is established.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Pivrinta

2010-07-03T23:59:59.000Z

368

Electricity Transmission and Distribution Technologies ...  

Electricity Transmission and Distribution Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research ...

369

Transmission Planning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to...

370

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

B. Kirby. 2001. Transmission Planning for a Restructuringindustry_issues/energy_infrastructure/transmission/transmission_hirst.pdf Joskow, P.L. 2005a. Transmission

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

371

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theMontana-Alberta Tie 230 kV Transmission Line: TransmissionNorthern California Transmission Line Project, Technical

Mills, Andrew D.

2009-01-01T23:59:59.000Z

372

STEPS TO ESTABLISH A REAL-TIME TRANSMISSION MONITORING SYSTEM FOR TRANSMISSION OWNERS AND OPERATORS WITHIN THE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STEPS TO ESTABLISH A REAL-TIME TRANSMISSION MONITORING STEPS TO ESTABLISH A REAL-TIME TRANSMISSION MONITORING SYSTEM FOR TRANSMISSION OWNERS AND OPERATORS WITHIN THE EASTERN AND WESTERN INTERCONNECTIONS A REPORT TO CONGRESS PURSUANT TO SECTION 1839 OF THE ENERGY POLICY ACT OF 2005 Prepared by United States Department of Energy & Federal Energy Regulatory Commission February 3, 2006 Report to Congress Joint Report by the Department of Energy and Federal Energy Regulatory Commission on Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western Interconnections February 2006 Executive Summary In August 2003, an electrical outage in one state precipitated a cascading blackout across seven other states and as far north as a province in Canada, leaving more than 50 million

373

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

374

User_Sup_Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Employees (Supervisors) Employees (Supervisors) © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Managing Employees (Supervisors) Purpose The purpose of this job aid is to guide supervisor users through the step-by-step process of managing employees within SuccessFactors Learning. Task A. Open and View a Employee's Record From the Home page, select the My Employees tab. 1 1 Run Reports 5 Steps Task C Approve or Deny Training Requests 9 Steps Task B Open and View an Employee's Record 5 Steps Task A SuccessFactors Learning v 6.4 User Job Aid Managing Employees (Supervisors) © 2011 SuccessFactors, Inc. - 2 - SuccessFactors Learning Confidential. All rights reserved. The My Employees section is designed to

375

Bulk Power Transmission Study  

E-Print Network (OSTI)

"Texans now have a choice. We can become more efficient and maintain our standard of living, or we can continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled, the extensive natural gas pipeline network moved energy easily within the state. In recent years two things have changed: 1. Electric utilities have made extensive investment in lignite, coal, and nuclear plants and, 2. Improvements in gas turbine technology and the removal of institutional barriers has encouraged cogeneration at many of our energy intensive process industries. This energy diversity means that there are now significant differences in energy costs between units. The variable costs of generation of power can vary between units by a ratio of 2 or 3 to 1 and this difference will be accentuated when energy costs rise (and they will; its a question of when, not if). The potential for costs savings by optional dispatching of the entire interconnected system are greater than ever before as demonstrated by the PUC's Bulk Power Transmission Study. And the potential can be enhanced with added transmission system investment. Cogeneration and small power production has proven to be the most cost effective way for Texas to add additional generating capacity needed to supply an economy that is starting to rebound and to replace old, obsolete power plants. The freedom to locate these facilities at the fuel source or at the site of large thermal demand makes real economic and environmental sense. The use of renewable or waste fuels allows something that would otherwise be wasted to contribute to our economy. Fossil fuels that are displaced can be redirected to another use or consumed for future benefit. By integrating a gas turbine generator with a. process plant, the natural gas required for producing electricity can be reduced by 40% below that required for a combined cycle. The heat rejected from a gas turbine, combined cycle, or steam plant can be redirected to a process use that contributes to our economy by producing something of value to world markets. By contrast a conventional power plant is paid for by the rate payers and consumes Texas natural resources and therefore is a burden rather than an enhancement to our economy. The optimal location of facilities are possible only if there is an adequate transmission system. Utility, consumer and industry must cooperate to improve our transmission system for the benefit of all Texas. The Texas Public Utilities Commission has taken the lead in promoting efficiency by requiring transmission wheeling between qualifying facilities and electric utilities. Several cogeneration facilities have been constructed as a result. In order to encourage small power production, the rule needs to be expanded to include projects interconnected with distribution systems. Most renewable resource projects are relatively small and cannot afford the cost of a high voltage interconnect, and yet their characteristics match a baseload need. The ability to wheel power to a utility that needs base load power from a distribution level interconnection is essential to development of these smaller projects."

John, T.

1988-09-01T23:59:59.000Z

376

2012 CERTS R&M Peer Review - Transmission Investment Assessment Under Uncertainty - Ben Hobbs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Investments Under Uncertainty & Transmission Investments Under Uncertainty & High Renewable Penetration: Representing Market Response using a Multi-stage Stochastic Model Approach with Recourse Model Approach with Recourse Benjamin F. Hobbs & Francisco Munoz Geography & Environmental Engineering Applied Math & Stat Geography & Environmental Engineering, Applied Math & Stat. Environment, Energy, Sustainability & Health Institute The Johns Hopkins University Richard E Schuler Richard E. Schuler Civil & Environmental Engineering, and Economics Cornell University August 2, 2011 Thanks to Saamrat Kasina and Harry van der Weijde for their assistance, and DOE CERTS for funding and DOE CERTS for funding O i Overview 1. The problem 1. The problem

377

User_OrgOwner_Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Organization Owner Overview Organization Owner Overview © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Organization Owner Overview Purpose The purpose of this job aid is to guide organization owners through the step-by-step process of available features within SuccessFactors Learning. The organization dashboard is a collection of charts and data tables that summarize learning data for your organizations and sub-organizations. Note: Depending on how permissions were configured in, access to the following features will vary for each organization. Task A. Organization Dashboard From the Home page, roll-over the Organization tab and select Dashboard from the list. 1 1 Succession Planner 7 Steps

378

NETL: Carbon Storage - Program Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Overview Program Overview Carbon Storage Program Overview The Carbon Storage Program involves three key elements for technology development: Core Research and Development (Core R&D), Infrastructure, and Global Collaborations. The image below displays the relationship among the three elements and provides a means for navigation throughout NETL's Storage Program Website. Click on Image to Navigate Storage Website Content on this page requires a newer version of Adobe Flash Player. Get Adobe Flash player NETL's Carbon Storage Program Structure CORE R&D Core R&D is driven by industry's technology needs and segregates those needs into focus areas to more efficiently obtain solutions that can then be tested and deployed in the field. The Core R&D Element contains four

379

AEO2013 Early Release Overview  

Gasoline and Diesel Fuel Update (EIA)

3 Early Release Overview 3 Early Release Overview AEO2013 Early Release Overview Executive summary Projections in the Annual Energy Outlook 2013 (AEO2013) Reference case focus on the factors that shape U.S. energy markets through 2040, under the assumption that current laws and regulations remain generally unchanged throughout the projection period. This early release focuses on the AEO2013 Reference case, which provides the basis for examination and discussion of energy market trends and serves as a starting point for analysis of potential changes in U.S. energy policies, rules, or regulations or potential technology breakthroughs. Readers are encouraged to review the full range of cases that will be presented when the complete AEO2013 is released in early 2013, exploring key uncertainties in the Reference case. Major highlights in the AEO2013 Reference case include:

380

AEO2014 Early Release Overview  

U.S. Energy Information Administration (EIA) Indexed Site

Administration | Annual Energy Outlook 2014 Early Release Overview Administration | Annual Energy Outlook 2014 Early Release Overview AEO2014 Early Release Overview Executive summary Projections in the Annual Energy Outlook 2014 (AEO2014) Reference case focus on the factors that shape U.S. energy markets through 2040, under the assumption that current laws and regulations remain generally unchanged throughout the projection period. The early release provides a basis for the examination and discussion of energy market trends and serves as a starting point for analysis of potential changes in U.S. energy policies, rules, or regulations or possible technology breakthroughs. Readers are encouraged to review the full range of cases that will be presented when the complete AEO2014 is released in 2014, exploring key

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

382

NREL: Transmission Grid Integration - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

383

Section Administration and Resources  

Science Conference Proceedings (OSTI)

Section Information, Membership, Newsletters and Awards Section Administration and Resources Awards Program aocs award Awards baldwin fats global inform job listings member membership network oils ...

384

Overview: Physical & DataLink LayersOverview: Physical & DataLink Layers How are frames assembled and transmitted ?  

E-Print Network (OSTI)

is SONET?What is SONET? q Synchronous optical network q Standard for digital optical transmission (bit pipe Section Overhead 3 Rows Path Overhead 90 Columns Synchronous Payload Envelope 9 Rows Line Overhead 6 Rows Line Overhead 6 Rows #12;Raj JainThe Ohio State University 13 Location of SPE in STS-1Location of SPE

Murphy, John

385

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications Proceedings of the March 25-26, 2009 Conference for the...

386

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

stability analysisoftransmissionanddistributionVoltageRecovery,NERCTransmissionIssues SubcommitteAirConditionerResponsetoTransmissionFaults. ,IEEE

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

387

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

differences: models for transmission property rights, IEEEto solve power transmission network design problems, IEEES. A. "Network topologies and transmission investment under

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

388

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

Georgia Transmission Corp Place Georgia Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission Yes...

389

A PRECISION ANALOG FIBER OPTIC TRANSMISSION SYSTEM  

E-Print Network (OSTI)

Optical Fibers for Transmission, John Wiley and Sons, 9.Laboratories, Transmission Systems for Communications, BellANALOG FIBER OPTIC TRANSMISSION SYSTEM G. Stover M.S. Thesis

Stover, G.

2010-01-01T23:59:59.000Z

390

Definition: Transmission Customer | Open Energy Information  

Open Energy Info (EERE)

Load-Serving Entity, or Purchasing-Selling Entity.1 Related Terms transmission service, transmission lines, transmission line References Glossary of Terms Used in Reliability...

391

Definition: Transmission Owner | Open Energy Information  

Open Energy Info (EERE)

facilities.1 Related Terms Transmission Operatortransmission lines, transmission line, transmission lines References Glossary of Terms Used in Reliability Standards An in...

392

Automated manual transmission clutch controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

1999-11-30T23:59:59.000Z

393

Transmission Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

394

Training Work Group Status Overview - July 2012 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Work Group Status Overview - July 2012 Training Work Group Status Overview - July 2012 Documents Available for Download July 2012 Status Overviews More Documents &...

395

Gamma Industry Processing Alliance Overview | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Gamma Industry Processing Alliance Overview Gamma Industry Processing Alliance Overview Gamma Industry Processing Alliance Overview More Documents & Publications 2011 NTSF Meeting...

396

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network (OSTI)

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

397

Packed Bed Combustion: An Overview  

E-Print Network (OSTI)

Packed Bed Combustion: An Overview William Hallett Dept. of Mechanical Engineering Université d'Ottawa - University of Ottawa #12;Packed Bed Combustion - University of Ottawa - CICS 2005 Introduction air fuel feedproducts xbed grate Packed Bed Combustion: fairly large particles of solid fuel on a grate, air supplied

Hallett, William L.H.

398

PNNL Overview March 14, 2013  

E-Print Network (OSTI)

1 PNNL Overview March 14, 2013 PNNL-SA-94292 #12;The National Laboratory system #12; Operated and academia PNNL is mission-driven We TRANSFORM THE WORLD through courageous DISCOVERY and INNOVATION. #12;What PNNL does and why it does it PNNL science and technology inspires and enables the world to live

399

Overview of Reactor and Nuclear  

E-Print Network (OSTI)

and Safety Gary Mays Nuclear Data and Criticality Safety Mike Dunn Nuclear Security Modeling Tim Valentine - Office of Environmental Management - Office of Intelligence · National Nuclear Security AdministrationOverview of Reactor and Nuclear Systems Division Cecil Parks RNS Division Director parkscv

400

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

2013 Transmission Reliability R&D Peer Review Presentations Available |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Transmission Reliability R&D Peer Review Presentations 3 Transmission Reliability R&D Peer Review Presentations Available 2013 Transmission Reliability R&D Peer Review Presentations Available September 9, 2013 - 3:25pm Addthis The agendas and presentations from the June and August 2013 Transmission Reliability R&D Program reviews are now available for download. The June 27-28 Transmission Reliability Program review combined the North American Synchrophasor Initiative (NASPI) and Advanced Application Development subprograms. The 2-day review included an overview of the program and six sessions of presentations from researchers funded by OE. The NASPI working group addresses the installation of synchrophasor networks across the United States with Recovery Act Smart Grid Investment Grant funds. Advanced Application Development projects include

402

Greenhouse Gas Program Overview (Revised) (Fact Sheet)  

SciTech Connect

Overview of the Federal Energy Management Program (FEMP) Greenhouse Gas program, including Federal requirements, FEMP services, and contacts.

Not Available

2010-06-01T23:59:59.000Z

403

Wind Powering America Program Overview (Fact Sheet)  

DOE Green Energy (OSTI)

This fact sheet provides an overview of the U.S. Department of Energy's Wind Powering America Program.

Not Available

2008-04-01T23:59:59.000Z

404

Overview of Offshore Wind Technology: Preprint  

SciTech Connect

This paper provides a short overview of some of the challenges facing the growth of offshore wind energy technology.

Butterfield, C. P.; Musial, W.; Jonkman, J.

2007-10-01T23:59:59.000Z

405

NEHRP - Summary Overview of the Research and ...  

Science Conference Proceedings (OSTI)

Library. Summary Overview of the Research and Development (R&D) Roadmap. The National Earthquake Hazards Reduction ...

406

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest...

407

The Electricity Transmission System Opportunities to Overcome Key Challenges  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Opportunities to Overcome Key Challenges Opportunities to Overcome Key Challenges Summary Results of Breakout Group Discussions Electricity Transmission Workshop Double Tree Crystal City, Arlington, Virginia November 2, 2012 Breakout Group Discussion Overview Opportunities to Overcome Key Challenges Each of the four breakout groups prioritized the critical issues facing the grid from the list of synthesized challenges identified in the first breakout session of the workshop. Focusing on these top priorities, each group proposed specific R&D activities and initiatives that DOE can pursue to overcome these challenges and address existing gaps. Summary of Synthesized Challenges A. Need improved understanding of the availability, utility, maintenance, exchange, and security of data and associated requirements.

408

Kentucky Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

EPRI, in conjunction with Georgia Transmission Corporation (GTC) and Photo Science, Inc. (PSI), developed a standardized methodology for siting overhead electric transmission lines. EPRI report 1013080, EPRI-GTC Overhead Electric Transmission Line Siting Methodology, published February 2006, provides additional information. This methodology has been applied in Georgia and currently is being applied to projects in Kentucky by East Kentucky Power Cooperative and E.ON U.S. on behalf of Louisville Gas and El...

2007-12-18T23:59:59.000Z

409

NREL: Transmission Grid Integration - Webmaster  

NLE Websites -- All DOE Office Websites (Extended Search)

reply. Your name: Your email address: Your message: Send Message Printable Version Transmission Grid Integration Home Issues Projects Research Staff Working with Us Publications...

410

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(including regional diversity, AC-DC transmission and distribution solutions, microgrids, energy storage, and centralized-decentralized control) * Accommodates two-way flows...

411

NREL: Transmission Grid Integration - Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Generation Integration Study Oahu Wind Integration and Transmission SIND Toolkit Electricity Market Design Energy Imbalance Markets Flexible Energy Scheduling Tool for...

412

EIS-0391-FEIS-Volume3-Section_1-2-2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SECTION 1 SECTION 1 OVERVIEW OF THE PUBLIC COMMENT PROCESS 1-1 SECTION 1 OVERVIEW OF THE PUBLIC COMMENT PROCESS This section of this Comment-Response Document (CRD) describes the public comment process for the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Draft TC & WM EIS) and the procedures used to respond to public comments. Section 1.1 summarizes the organization of this CRD. Section 1.2 discusses the public comment process and the means through which comments on the draft environmental impact statement (EIS) were received and addressed. Section 1.3 describes the public hearings on the Draft TC & WM EIS, including hearing locations and dates. Section 1.4 notes the role of the cooperating agencies.

413

Overview of the United Nations Environment Programme's Solar...  

Open Energy Info (EERE)

Overview of the United Nations Environment Programme's Solar and Wind Energy Resource Assessment (SWERA) Project (Abstract):Project overview describing...

414

Transmission/Permitting Atlas/State Data | Open Energy Information  

Open Energy Info (EERE)

Transmission/Permitting Atlas/State Data Transmission/Permitting Atlas/State Data < Transmission‎ | Permitting Atlas Jump to: navigation, search PermittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State State Siting Act State Preemptive Authority Siting/Permitting Entities Permit Processing Timeframe Arizona None If TLSC finds compliance with local land use unreasonable or unfeasible, then the TLSC may grant a certificate Arizona Corporation Commission (ACC); Transmission Line Siting Committee (TLSC) 210-240 Days California Public Utilities Code Section 1001 Local jurisdictions are preempted from regulating electric power line projects California Public Utilities Commission (CPUC) 18 months

415

The interior transmission problem and bounds on transmission eigenvalues  

E-Print Network (OSTI)

We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Pivrinta

2010-09-28T23:59:59.000Z

416

The interior transmission problem and bounds on transmission eigenvalues  

E-Print Network (OSTI)

We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

Hitrik, Michael; Ola, Petri; Pivrinta, Lassi

2010-01-01T23:59:59.000Z

417

European Section Articles of interest.  

Science Conference Proceedings (OSTI)

European geographical region. European Section Articles of interest. Sections award awards canadian division fats member membership network oils section European Section aocs awards European Section European Section Awards for Young Lipid Scienti

418

SAMS Overview | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

SAMS Overview | National Nuclear Security Administration SAMS Overview | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog SAMS Overview Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management & Safeguards System > SAMS Overview SAMS Overview U.S. Department of Energy / U.S. Nuclear Regulatory Commission

419

Overview of Rocky Mountain Region's Capital Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Capital Investment Plan 2 Transmission Planning Workshop 2011 10-YR Network Load Forecast Study and Process Transmission Planning Loveland, CO June 21, 2011 3 Purpose ...

420

Overview of the ESCO Selection Process and FEMP ESPC Templates  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Overview of the ESCO Selection Process and FEMP ESPC Templates A high-level overview of the steps towards ESCO selection is depicted in the figure below. The corresponding ESPC templates created to assist with each step are indicated on the right-hand side. This is not a comprehensive view of all DOE IDIQ task order award procedures. Please consult the IDIQ for more specific procedures. Circle A in the diagram represents the IDIQ section H3.1 "Selection Based on Qualifications (SBQA) Method" and Circle B represents the H3.1 "Selection Based on Preliminary Assessment" Method (SBPA). ESCO Selection Steps & Templates Contact FFS & plan acquisition 01 - Acquisition Plan 02 - Milestone Plan 03 - Notice of Opportunity 04 -

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Overview of Federal Energy Management Policy and Mandates  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview of Federal Energy Management Policy and Mandates Overview of Federal Energy Management Policy and Mandates Energy Intensity Reduction Goal The National Energy Conservation Policy Act (NECPA), as amended, requires Federal agencies to improve energy management in their facilities and operations. (42 U.S.C. 8253) Amendments to NECPA made by the Federal Energy Management Improvement Act of 1988 (P.L. 100-615), required each agency to achieve a 10 percent reduction in energy consumption in its Federal buildings by FY 1995, when measured against a FY 1985 baseline on a Btu-per-gross-square-foot (Btu/GSF) basis. It also directed DOE to establish life-cycle costing methods and coordinate Federal conservation activities through the Interagency Energy Management Task Force. Section 543 of NECPA contained provisions requiring a reduction in Btu/GSF of 20 percent by 2000,

422

Overview of Federal Energy Management Policy and Mandates  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overview of Federal Energy Management Policy and Mandates Overview of Federal Energy Management Policy and Mandates Energy Intensity Reduction Goal The National Energy Conservation Policy Act (NECPA), as amended, requires Federal agencies to improve energy management in their facilities and operations. (42 U.S.C. 8253) Amendments to NECPA made by the Federal Energy Management Improvement Act of 1988 (P.L. 100-615), required each agency to achieve a 10 percent reduction in energy consumption in its Federal buildings by FY 1995, when measured against a FY 1985 baseline on a Btu-per-gross-square-foot (Btu/GSF) basis. It also directed DOE to establish life-cycle costing methods and coordinate Federal conservation activities through the Interagency Energy Management Task Force. Section 543 of NECPA contained provisions requiring a reduction in Btu/GSF of 20 percent by 2000,

423

Overview Of The Lake City, California Geothermal System | Open Energy  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Overview Of The Lake City, California Geothermal System Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Paper: Overview Of The Lake City, California Geothermal System Details Activities (1) Areas (1) Regions (0) Abstract: Following a spectacular mud volcano eruption in 1951, the Lake City geothermal system has been intermittently explored for 44 years. A discovery well was drilled 30 years ago. The geothermal system is associated with a two mile-long, north-south trending, abnormally complex section of the active Surprise Valley fault zone that has uplifted the

424

Chapter 4 Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

425

Division and Section Awards  

Science Conference Proceedings (OSTI)

Division and Section Awards Division and Section Awards Divisions achievement agricultural analytical application award awards biotechnology detergents distinguished division Divisions edible fats food Interest Area lipid lipids member membership

426

Sections / Geographical Regions Information  

Science Conference Proceedings (OSTI)

AOCS Sections provide a local forum for fats and oils professionals. Building a Stronger Global Association Sections / Geographical Regions Information Divisions achievement agricultural analytical application award awards biotechnology detergents

427

Appendix 7 - Stripes Architecture Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Name: Department of Energy iManage Program Name: Department of Energy iManage Program Project ID: iManage Program STRIPES Project Project Manager: Mathew Sparks Program Mgr: Lajos Grof-Tisza Doc ID: STRIPES Technical Architecture Page i 8/30/2012 U.S. Department of Energy Office of the Chief Financial Officer iManage Strategic Integrated Procurement Enterprise System STRIPES Technical Architecture Overview Status of Document Draft Delivered Accepted Program Name: Department of Energy iManage Program Project ID: iManage Program STRIPES Project Project Manager: Mathew Sparks Program Mgr: Lajos Grof-Tisza Doc ID: STRIPES Technical Architecture Page ii 8/30/2012 Title Page Document Name: Strategic Integrated Procurement Enterprise System (STRIPES) Technical Architecture Overview

428

CMS e-Lab Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

CMS e-Lab Overview     CMS e-Lab Overview &nbsp&nbsp&nbsp With the CMS e-Lab students can join a scientific collaboration in this series of studies of high-energy collisions from the Large Hadron Collider (LHC) at CERN. We are collaborating with the Compact Muon Solenoid (CMS) experiment to produce a student-led, teacher-guided project. At the present, we have test beam, Monte Carlo (simulated) data and run data. We expect more data through 2010 and 2011. By using the web, students are able to analyze and share these data with fellow students and other researchers. Students write a researchable question and analyze data in much the same way as professional scientists. e-Lab tools facilitate collaboration among students as they develop their investigations and report their results.

429

First National Climate Assessment: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview Print E-mail Overview Print E-mail Below you will find answers to the most frequently asked questions about the First National Climate Assessment Report. alt Goal and Architecture Organization and Mandate Regions Sectors Synthesis Report Scenarios Relationship to Other Activities Goal and Architecture What was the goal of the First National Assessment? The overall goal of the National Assessment was to analyze and evaluate what was known about the potential consequences of climate variability and change for the nation in the context of other pressures on the public, the environment, and the nation's resources. Special efforts were made to involve the end users - such as water resource managers, farmers, and decisionmakers - in all stages of the Assessment so that the final outcome was useful to the widest audience possible and was truly developed through a participatory process.

430

Fuel Cell Technologies Program Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

IEA HIA Hydrogen Safety Stakeholder IEA HIA Hydrogen Safety Stakeholder Workshop Bethesda, Maryland Fuel Cell Technologies Program Overview Dr. Sunita Satyapal U.S. Department of Energy Fuel Cell Technologies Program Program Manager 10/2/2012 2 | Fuel Cell Technologies Program eere.energy.gov Overview Fuel Cells - An Emerging Global Industry Clean Energy Patent Growth Index [1] shows that fuel cell patents lead in the clean energy field with over 950 fuel cell patents issued in 2011. * Nearly double the second place holder, solar, which has ~540 patents. [1] http://cepgi.typepad.com/files/cepgi-4th-quarter-2011-1.pdf United States 46% Germany 7% Korea 7% Canada 3% Taiwan 1% Great Britain 1% France 1% Other 3% Japan 31% Fuel Cell Patents Geographic Distribution 2002-2011 Top 10 companies: GM, Honda, Samsung,

431

Appendix 5 - STARS Architectual Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Last saved by Coombs Page 1 7/27/2012 Last saved by Coombs Page 1 7/27/2012 Draft Appendix 5 - STARS Architectural Overview ARC101 - Architectural Overview for Department of Energy iManage Program - STARS Project Deliverable ID: IT0013 Version number: 1.09 Draft/Final as of: 18 Oct 2005 Printed on: 27 Jul 2012 Author: Richard Popovich, STARS System Architect Richard.Popovich@hq.doe.gov (301) 903-2223 Owner: Laura Kramer, STARS Project Manager Status of Document Draft Delivered Accepted Last saved by Coombs Page 2 7/27/2012 Draft Document information Document source This document is maintained as an online document. Contact the author for the latest version. Revision history Version number Date Summary of changes Revised By 1.01 08 Jul 03 Version 1 Richard Popovich,

432

AEO2010 Early Release Overview  

Gasoline and Diesel Fuel Update (EIA)

10 10 Early Release Overview December 2009 Energy Trends to 2035 In preparing the Annual Energy Outlook 2010 (AEO- 2010), the Energy Information Administration (EIA) evaluated a wide range of trends and issues that could have major implications for U.S. energy markets. This overview focuses primarily on one case, the AEO2010 reference case, which is presented and com- pared with the updated Annual Energy Outlook 2009 (updated AEO2009) reference case released in April 2009 1 (see Table 1). Because of the uncertainties in- herent in any energy market projection, particularly in periods of high price volatility, rapid market trans- formation, or active changes in legislation, the refer- ence case results should not be viewed in isolation. Readers are encouraged to review the alternative cases when the complete AEO2010 publication is re- leased in order to gain perspective on how variations

433

Program Overview | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information Center » DOE Technical Standards Program » Program Information Center » DOE Technical Standards Program » Program Overview Program Overview Vision The culture of the DOE community will be based on standards. Technical standards will formally integrate part of all DOE facility, program and project activities. The DOE will be recognized as a participant in the use and development of technical standards. The Technical Standards Program will be a benchmark for efficiency, value and support for the DOE customer. Mission In support of the Department's Standards Program and in partnership with all stakeholders, the mission is to enhance DOE's transition to a standards-based culture by providing information, coordinating activities, and promoting the use of consensus standards, and when needed, the development of DOE technical standards.

434

ACHRE Report: Part I Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Part I: Overview Part I: Overview When the Advisory Committee began work in April 1994 we were charged with determining whether "the [radiation] experiments' design and administration adequately met the ethical and scientific standards, including standards of informed consent, that prevailed at the time of the experiments and that exist today" and also to "determine the ethical and scientific standards and criteria by which it shall evaluate human radiation experiments." Although this charge seems straightforward, it is in fact difficult to determine what the appropriate standards should be for evaluating the conduct and policies of thirty or fifty years ago. First, we needed to determine the extent to which the standards of that time are similar to the standards of today. To the extent that there were differences we needed to determine the relative roles of each in making moral evaluations.

435

Fuel Cell Technologies Program Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Fuel Cell Technologies Fuel Cell Technologies Program Overview Program Overview Richard Farmer Richard Farmer Acting Acting Program Program Manager Manager Acting Acting Program Program Manager Manager 2010 Annual Merit Review and Peer Evaluation Meeting 2010 Annual Merit Review and Peer Evaluation Meeting (7 June 2010) (7 June 2010) The Administration's Clean Energy Goals 9 9 Double Renewable Double Renewable Energy Capacity by 2012 9 Invest $150 billion over ten years i in energy R&D to transition to a clean energy economy clean energy economy 9 Reduce GHG emissions 83% by 2050 2 t t Æ Æ F l ll ff hi hl ffi i di f l d Fuel Cells Address Our Key Energy Challenges Increasing Energy Increasing Energy Ef ficiency and Resource Diversity Efficiency and Resource Diversity Æ Æ Fuel cells offer a highly efficient way to use diverse fuels and energy sources.

436

Annual Energy Outlook 2001 - Overview  

Gasoline and Diesel Fuel Update (EIA)

Overview Overview Key Energy Issues to 2020 Prices Consumption Energy Intensity Electricity Generation Production and Imports Carbon Dioxide Emissions Key Energy Issues to 2020 Currently, most attention in energy markets is focused on near-term issues of world oil supply and prices, U.S. natural gas prices, and the transition to restructured electricity markets in several regions of the country. The Annual Energy Outlook 2001 (AEO2001) addresses the longer-term trends of electricity industry restructuring, fossil fuel supply and prices, and the impacts of economic growth on projected energy use and carbon dioxide emissions. AEO2001 does not project short-term events, such as supply disruptions or severe weather. The AEO2001 projections assume a transition to full competitive pricing of

437

Semiclassical transmission across transition states  

E-Print Network (OSTI)

It is shown that the probability of quantum-mechanical transmission across a phase space bottleneck can be compactly approximated using an operator derived from a complex Poincar\\'e return map. This result uniformly incorporates tunnelling effects with classically-allowed transmission and generalises a result previously derived for a classically small region of phase space.

Stephen C. Creagh

2005-06-01T23:59:59.000Z

438

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

439

ITC Transmission | Open Energy Information  

Open Energy Info (EERE)

ITC Transmission ITC Transmission Jump to: navigation, search Name ITC Transmission Place Michigan Utility Id 56068 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=ITC_Transmission&oldid=410858" Categories: EIA Utility Companies and Aliases Utility

440

PROPOSAL FOR CONTINGENT TRANSMISSION PLANS  

E-Print Network (OSTI)

How should the WECCs RTEP process develop a 10-year transmission plan based upon transmission studies completed over the past several years? This paper explores the notion of a plan that consists of a package containing a small number of contingent plans that would correspond to a limited number of future states of the world by 2020. The rationale for developing transmission plans on a contingent basis is based on the following observations. Contingencies. Insights from TEPPC transmission planning over the past several years indicate that the demand for future transmission expansion in the West is contingent upon a number of important drivers including: (1) Levels of state renewable portfolio standards (RPS); (2) Development of remote versus local renewable generation; (3) Load growth given DSM policies and economic growth; (4) Policies to reduce greenhouse gas (GHG) emissions; (5) Shifts of innovation and cost competitiveness between wind and solar energy; (6) Advances in distributed generation technologies;

unknown authors

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Transmission Reliability | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

442

Energy Transmission and Infrastructure  

SciTech Connect

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); analyze the potential within the district to utilize farm wastes to produce biofuels; enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; identify the policy, regulatory, and financial barriers impeding development of a new energy system; and improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the Colleges yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

443

Downhole Data Transmission System  

DOE Patents (OSTI)

A system for transmitting data through a string of down-hole components. In accordance with one aspect, the system includes a plurality of downhole components, such as sections of pipe in a drill string. Each downhole component includes a pin end and a box end, with the pin end of one downhole component being adapted to be connected to the box end of another. Each pin end includes external threads and an internal pin face distal to the external threads. Each box end includes an internal shoulder face with internal threads distal to the internal shoulder face. The internal pin face and the internal shoulder face are aligned with and proximate each other when the pin end of the one component is threaded into a box end of the other component.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT)

2004-04-06T23:59:59.000Z

444

NWCC Transmission Case Study III  

DOE Green Energy (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

445

The Cost of Transmission for Wind Energy: A Review of Transmission...  

NLE Websites -- All DOE Office Websites (Extended Search)

Wind Energy: A Review of Transmission Planning Studies Title The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies Publication Type Report Year of...

446

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theand Preference in Transmission Service. Washington, D.C. :Integrating Wind into Transmission Planning: The Rocky

Mills, Andrew D.

2009-01-01T23:59:59.000Z

447

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

low unit transmission costs, there were still numerous studies with high transmission voltages that had much higher unit costs than studies with transmission lines

Mills, Andrew D.

2009-01-01T23:59:59.000Z

448

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

Transmission Planning and Wind Energy. Issue Brief. August.of new transmission for wind energy due to the complex andincreasingly including wind energy in transmission plans. We

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

449

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

such as major transmission lines or large generators, areto the nearest bulk transmission line is the only dedicatedon constrained transmission lines (or conversely, pay

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

450

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

transmission cost barrier for wind energy. A secondary goalfocus on the cost of transmission for wind energy does notincremental cost of transmission for wind energy implied by

Mills, Andrew D.

2009-01-01T23:59:59.000Z

451

Diboson production cross section at LHC  

E-Print Network (OSTI)

This paper presents an overview of the diboson production cross-section measurements and constraints on anomalous triple-gauge boson couplings performed by the ATLAS and CMS collaborations using proton-proton collisions produced at a centre-of-mass energy of sqrt{s} = 7 and 8 TeV at LHC. Results for all combinations of W, Z and \\gamma\\ gauge bosons (excluding \\gamma\\gamma) are presented with emphasis on the new WZ and ZZ production cross sections measured by ATLAS at sqrt{s} = 8 TeV and on the new constraints on anomalous triple-gauge couplings set by CMS in the WW and Z\\gamma\\ modes.

Vincenzo Lombardo

2013-05-16T23:59:59.000Z

452

SunShot Initiative: Transmission Grid Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Grid Integration to Transmission Grid Integration to someone by E-mail Share SunShot Initiative: Transmission Grid Integration on Facebook Tweet about SunShot Initiative: Transmission Grid Integration on Twitter Bookmark SunShot Initiative: Transmission Grid Integration on Google Bookmark SunShot Initiative: Transmission Grid Integration on Delicious Rank SunShot Initiative: Transmission Grid Integration on Digg Find More places to share SunShot Initiative: Transmission Grid Integration on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards

453

Midwest Transmission Workshop I Summary  

SciTech Connect

OAK-B135 The meeting was opened with a review of the purposes of the workshop: (1) Present and discuss key studies and assessments of transmission upgrades, additions and related issues for the upper Midwest, including work that addresses the full range of views on these topics; (2) Understand the various transmission issues in the upper Midwest and discuss options for addressing the issues; and (3) Identify the decision makers and entities that need to play an active role if transmission issues are to be resolved, and agree on next steps for engaging these individuals and organizations through education, outreach, and information dissemination.

Kevin Bryan

2001-05-01T23:59:59.000Z

454

GRR/Section 3-AK-c - Encroachment Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-AK-c - Encroachment Permit GRR/Section 3-AK-c - Encroachment Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-AK-c - Encroachment Permit 03AKCEncroachmentOverview.pdf Click to View Fullscreen Contact Agencies Alaska Department of Transportation and Public Facilities Regulations & Policies 17 AAC 10.011: Encroachments Authorized 17 AAC 10.012: Approval Requirements 17 AAC 15.011: Utility Permits Triggers None specified Click "Edit With Form" above to add content 03AKCEncroachmentOverview.pdf 03AKCEncroachmentOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 3-AK-c.1 - Will the Developer Construct a Utility Within ADOT ROW or

455

Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Visit to Fermilab National Accelerator Laboratory (FNAL) by the Visit to Fermilab National Accelerator Laboratory (FNAL) by the Committee on the Status of Women in Physics and the Committee on Minorities in Physics of the American Physical Society Introduction and Background. The Committee on the Status of Women in Physics (CSWP) and the Committee on Minorities (COM) of the American Physical Society (APS) jointly organized and conducted a site visit to Fermilab National Accelerator Laboratory (FNAL) at the request of the Laboratory Director, Piermaria Oddone. The purpose of the visit was to assess the Laboratory's climate for women and minorities in physics and closely related fields, and to provide advice to the Laboratory's leadership on how to improve inclusiveness. The visit was recommended in 2007 by the FNAL Committee on Hiring and Retention of Scientific Staff. The visit was held

456

Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Office Office of Science, the Atmospheric Radiation Measurement (ARM) Climate Research Facility maintains heavily instrumented field sites in Oklahoma, Alaska, and the tropics. Operating since the mid-1990s, these fixed sites obtain continuous measurements of a broad range of atmospheric conditions, such as cloud profiles, aerosols, precipitation, and solar and terrestrial radiation. Mirroring these permanent sites, two ARM Mobile Facilities provide portable instrumented platforms for obtaining measurements in data-poor regions for up to 12 months at a time. Supplementing these ground-based measurement capabilities, similar airborne measurements are obtained through the ARM Aerial Facility. These data allow researchers around the world to study and improve the way atmospheric processes

457

Overview  

Science Conference Proceedings (OSTI)

...of solute-solute and solute-solvent equilibria Kinetic investigations Structure determination in solution Examples of Applications Analysis and characterization of metals in commercial chemicals,

458

Overview  

Office of Legacy Management (LM)

This page intentionally left blank U.S. Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. No. S03496-7.0-Final Attachment E-Community...

459

Overview  

Science Conference Proceedings (OSTI)

... Jerde, ID Technology Partners (NIST Contractor) Yooyoung Lee, Department of Computer Engineering, University of Chung-Ang, Korea (NIST ...

2012-11-09T23:59:59.000Z

460

Overview  

Science Conference Proceedings (OSTI)

... TSB (foreground, left side) with a bridge walkway connecting ... H2 gas lines run through a support structure for ... flow through a series of pipes and ring ...

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Overview  

Science Conference Proceedings (OSTI)

... Space; Underwater; USPS; Underground coal mining. 1. Multiple Hierarchical Control Levels. A control system contains multiple ...

2011-01-14T23:59:59.000Z

462

Overview  

E-Print Network (OSTI)

This report highlights the U.S. Nuclear Regulatory Commissions (NRCs) accomplishments in implementing the E-Government Act of 2002 (E-Gov Act), describes the agencys National Source Tracking System to illustrate an agency-specific E-Gov initiative, and explains NRCs process for determining whether to make information publically available on the Internet. Agencys Overall Implementation of the E-Gov Act Compliance With OMB Guidance: NRC has taken a number of steps to institutionalize OMBs guidance on the E-Gov program. The Office of Administration has instructed NRCs Contract Management Centers to use the SmartBuy contract as the preferred choice for software acquisitions. NRC has added an acquisition official from the Office of Administration to its Information Technology Business Council (ITBC) to ensure that agency investments in information technology do not overlap E-Gov initiatives. NRC has also given OMB NRCs E-Gov implementation plan and has begun tracking high-risk E-Gov initiatives as required. Implementations Completed/Planned: NRC has completed migrations to E-Payroll, E-Clearance (E-Qip), and a number of Integrated Acquisition System (IAS) sub components and has a working agreement with USA Services. In addition to basic services, USA Services will provide help desk support for the licensing proceeding for the proposed high-level waste repository at Yucca Mountain. NRC is currently migrating to four other initiatives: E-Training,

On E-government; Act Of

2005-01-01T23:59:59.000Z

463

Overview  

National Nuclear Security Administration (NNSA)

Malaysia Netherlands Oman Pakistan Panama Panama Panama Portugal Singapore South Korea Spain Sri Lanka Taiwan Thailand United Kingdom *SFI Ports Status of Megaports...

464

Overview  

E-Print Network (OSTI)

Subject: ESP-SCSI for Parameter Data This proposal defines a mechanism for applying SA parameter data to descriptors that are transferred in data-in buffer and/or data-out buffer parameter data.

From Ralph; O. Weber; Matt Ball; David Black

2007-01-01T23:59:59.000Z

465

Overview  

Science Conference Proceedings (OSTI)

... The recording drives used in this study include the Sony DRU-510A, 700A , 800A, Pioneer DVR-A09 , Plextor PX-716SA and NEC ND -2510A . ...

466

Overview  

U.S. Energy Information Administration (EIA)

demand for kerosene in home heating. ... R&D of energy technology since the 1970s have substantially increased energy efficiency. Sector organization

467

Overview  

Gasoline and Diesel Fuel Update (EIA)

Producers, Third Quarter 2010 Producers, Third Quarter 2010 Third Quarter 2010 Key Findings Net Income $17.4 billion Revenues $285.0 billion Highlights Twenty major energy producers reported a 32-percent increase in third-quarter net income relative to the third quarter of 2009 (Q309). This percentage increase in the third quarter of 2010 (Q310) was primarily because net income in Q309 was unusually low. Q310 income was 41- percent lower than the third-quarter average for 2005- 2009. The effects of higher crude oil and natural gas prices, higher foreign oil and worldwide natural gas production, higher U.S. refining margins, and higher U.S. refinery throughput overwhelmed the effects of lower U.S. crude oil production and lower foreign refinery throughput and led to higher net income.

468

Overview  

Science Conference Proceedings (OSTI)

... The H2 condenser is seen above the beam port; warm H2 gas lines run through a support structure for MACS to a ballast tank seen on the left. ...

469

Overview  

Emergency response dispersion models use the space- and time-dependent meterological data provided by this model to supplement local and regional ...

470

Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AGENDA TUESDAY, FEBRUARY 7 MEETING ROOM-WINDOWS ROOM 8:30am - 8:50am WELCOME, INTRODUCTIONS AND OPENING REMARKS CONTINENTAL BREAKFAST WILL BE SERVED Tracey A. LeBeau, Director, DOE Office of Indian Energy Lamont Jackson, Representative, DOE Office of Electricity Delivery and Energy Reliability Introductions 8:50am - 9:10am FEDERAL TRANSMISSION DISCUSSION: TRANSMISSION EXPANSION IN THE WEST Timothy Meeks, Administrator, Western Area Power Administration 9:10am - 9:30am TRANSMISSION DEVELOPMENT IN THE PACIFIC: PERSPECTIVES FROM BONNEVILLE POWER ADMINISTRATION Bill Drummond, Deputy Administrator, Bonneville Power Administration 9:30am - 10:45am TRANSMISSION POLICY AND REGULATION PRIMER: OVERVIEW OF JURISDICTIONAL AUTHORITIES & CURRENT POLICY TRENDS

471

Multiphase inverse modeling: An Overview  

DOE Green Energy (OSTI)

Inverse modeling is a technique to derive model-related parameters from a variety of observations made on hydrogeologic systems, from small-scale laboratory experiments to field tests to long-term geothermal reservoir responses. If properly chosen, these observations contain information about the system behavior that is relevant to the performance of a geothermal field. Estimating model-related parameters and reducing their uncertainty is an important step in model development, because errors in the parameters constitute a major source of prediction errors. This paper contains an overview of inverse modeling applications using the ITOUGH2 code, demonstrating the possibilities and limitations of a formalized approach to the parameter estimation problem.

Finsterle, S.

1998-03-01T23:59:59.000Z

472

Transmission Planning | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

473

Scanning/Transmission Electron Microscopes  

NLE Websites -- All DOE Office Websites (Extended Search)

ScanningTransmission Electron Microscopes Nion UltraSTEM 60-100 dedicated aberration-corrected STEM for low- to mid-voltage operation and Enfina EELS Contact: Juan-Carlos Idrobo,...

474

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

The objective of this project is to reduce capital cost by extending life expectancy of overhead transmission wood structures through inspection and assessment procedures and through aging mitigation techniques and tools.

2005-11-29T23:59:59.000Z

475

Special Section on RFID  

E-Print Network (OSTI)

The eight articles in this special section describe state-of-the-art technologies and tools and one application of RFID.

Engels, Daniel W.

476

Section J: HOUSEHOLD CHARACTERISTICS  

U.S. Energy Information Administration (EIA)

2001 Residential Energy Consumption Survey Form EIA-457A (2001)--Household Questionnaire OMB No.: 1905-0092, Expiring February 29, 2004 42 Section J: HOUSEHOLD ...

477

Section D: SPACE HEATING  

U.S. Energy Information Administration (EIA)

2005 Residential Energy Consumption Survey Form EIA-457A (2005)--Household Questionnaire OMB No.: 1905-0092, Expiring May 31, 2008 33 Section D: SPACE HEATING

478

Transmission Structure Foundation Design Guide  

Science Conference Proceedings (OSTI)

This guide contains the most current and comprehensive information for the design of foundations for overhead line structures. The guide covers the complete transmission structure foundation design process from the subsurface investigations and design of the foundations, to the construction and inspection of the foundation. Reference documents to assist transmission structure foundation designers in the development of specifications such as for subsurface investigations and foundation construction ...

2012-11-28T23:59:59.000Z

479

Transmission Valuation and Cost Recovery  

Science Conference Proceedings (OSTI)

This technical update provides information on the status of the electric power industry regarding the economic valuation of transmission projects. Such valuations became critical with the introduction of economic transmission projects in the context of competitive electricity markets. Economic valuation is also becoming increasingly important for traditional reliability upgrades, because of the need for consistency in cost allocations between the two types of upgrades. The year 2005 has brought significa...

2005-12-22T23:59:59.000Z

480

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

Transmission and distribution infrastructures throughout the world are aging. As such, inspection, assessment, and maintenance of existing facilities have become increasingly important topics. This valuable reference provides an in-depth look at all facets of an inspection, assessment, and maintenance program for transmission line wood structures to help utilities develop and refine individual maintenance programs. The report is part of a broader multi-year effort by EPRI to develop a comprehensive handb...

2006-09-28T23:59:59.000Z

Note: This page contains sample records for the topic "transmission overview section" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

"Weekly U.S. Coal Production Overview"  

U.S. Energy Information Administration (EIA) Indexed Site

2" "Report Released: August 15, 2013" "Next Release Date: August 22, 2013" "Weekly U.S. Coal Production Overview" "(thousand short tons)" "Coal-Producing","Week...

482

Distributed Energy Resources Program Technology Overview  

DOE Green Energy (OSTI)

New fact sheets for the DOE Office of Power Technologies (OPT) that provide technology overviews, description of DOE programs, and market potential for each OPT program area.

Not Available

2001-11-01T23:59:59.000Z

483

Standard Review Plan - Overview | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review Plan Overview More Documents & Publications Preliminary Safety Design RM Quality Assurance for Critical Decision Reviews RM Checkout, Testing, and Commissioning Plan RM...

484

IAPMO/PMI CCE Overview and Update  

NLE Websites -- All DOE Office Websites (Extended Search)

BUILDING TECHNOLOGIES PROGRAM Energy Conservation Program for Consumer Products and Commercial and Industrial Equipment IAPMOPMI CCE Overview and Update June 24, 2011 2 |...

485

Course Overview Pump Systems Matter Optimization | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Course Overview Pump Systems Matter Optimization Attendees of the "Pump Systems Optimization" one-day course will gain valuable new skills to help them improve...

486

Solar Energy Technologies Program Technology Overview  

Science Conference Proceedings (OSTI)

New fact sheets for the DOE Office of Power Technologies (OPT) that provide technology overviews, description of DOE programs, and market potential for each OPT program area.

Not Available

2001-11-01T23:59:59.000Z

487

SLAC National Accelerator Laboratory - SLAC Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

SLAC Overview An aerial image of SLAC's facilities SLAC National Accelerator Laboratory is one of 10 Department of Energy (DOE) Office of Science laboratories and is operated by...

488

AEDG Recommendations -- Envelope Overview | Building Energy Codes...  

NLE Websites -- All DOE Office Websites (Extended Search)

provides an overview of the envelope recommendations provided in the ASHRAE Advanced Energy Design Guides (30% Series). Estimated Length: 1 hour, 2 minutes Presenters: John...

489

AEDG Recommendations -- Mechanical Overview | Building Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

provides an overview of the mechanical recommendations provided in the ASHRAE Advanced Energy Design Guides (30% Series). Estimated Length: 40 minutes Presenters: Paul...

490

PPPL Overview | Princeton Plasma Physics Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

Join Our Mailing List A Collaborative National Center for Fusion & Plasma Research Search form Search Search Home About Overview Learn More Visiting PPPL History...

491

Ultra-Long-Haul WDM transmission systems  

Science Conference Proceedings (OSTI)

This paper discusses the key transmission issues and design considerations for ultra-long-haul WDM systems. The key enabling technologies for the current generation of ultra-long-haul WDM transmission are described. Noise analysis and transmission modelling ...

Y. R. Zhou; A. Lord; S. R. Sikora

2002-10-01T23:59:59.000Z

492

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

case study of U.S. transmission line siting, Energy Policy,Dual variable on transmission line ks power flownetwork branches (transmission lines), it is possible to

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

493

Natural gas pipeline technology overview.  

Science Conference Proceedings (OSTI)

The United States relies on natural gas for one-quarter of its energy needs. In 2001 alone, the nation consumed 21.5 trillion cubic feet of natural gas. A large portion of natural gas pipeline capacity within the United States is directed from major production areas in Texas and Louisiana, Wyoming, and other states to markets in the western, eastern, and midwestern regions of the country. In the past 10 years, increasing levels of gas from Canada have also been brought into these markets (EIA 2007). The United States has several major natural gas production basins and an extensive natural gas pipeline network, with almost 95% of U.S. natural gas imports coming from Canada. At present, the gas pipeline infrastructure is more developed between Canada and the United States than between Mexico and the United States. Gas flows from Canada to the United States through several major pipelines feeding U.S. markets in the Midwest, Northeast, Pacific Northwest, and California. Some key examples are the Alliance Pipeline, the Northern Border Pipeline, the Maritimes & Northeast Pipeline, the TransCanada Pipeline System, and Westcoast Energy pipelines. Major connections join Texas and northeastern Mexico, with additional connections to Arizona and between California and Baja California, Mexico (INGAA 2007). Of the natural gas consumed in the United States, 85% is produced domestically. Figure 1.1-1 shows the complex North American natural gas network. The pipeline transmission system--the 'interstate highway' for natural gas--consists of 180,000 miles of high-strength steel pipe varying in diameter, normally between 30 and 36 inches in diameter. The primary function of the transmission pipeline company is to move huge amounts of natural gas thousands of miles from producing regions to local natural gas utility delivery points. These delivery points, called 'city gate stations', are usually owned by distribution companies, although some are owned by transmission companies. Compressor stations at required distances boost the pressure that is lost through friction as the gas moves through the steel pipes (EPA 2000). The natural gas system is generally described in terms of production, processing and purification, transmission and storage, and distribution (NaturalGas.org 2004b). Figure 1.1-2 shows a schematic of the system through transmission. This report focuses on the transmission pipeline, compressor stations, and city gates.

Folga, S. M.; Decision and Information Sciences

2007-11-01T23:59:59.000Z

494

Energia Sierra Juarez U.S. Transmission Line Final EIS Volume 3a, part 1 of 3  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energia Sierra Juarez U.S. Transmission Line Project Energia Sierra Juarez U.S. Transmission Line Project Final Environmental Impact Statement Volume 3 - Comments and Responses Document May 2012 U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Washington, DC 20585 Cooperating Agency - County of San Diego San Diego, CA DOE/EIS-0414 Energia Sierra Juarez U.S. Transmission Line Final EIS i May2012 Table of Contents VOLUME 1 FINAL ENVIRONMENTAL IMPACT STATEMENT Distribution Letter Cover Sheet Summary ................................................................................................................................................... S-1 S.1 Background and Overview ............................................................................................... S-1

495

EIA - Greenhouse Gas Emissions Overview  

Gasoline and Diesel Fuel Update (EIA)

1. Greenhouse Gas Emissions Overview 1. Greenhouse Gas Emissions Overview 1.1 Total emissions Total U.S. anthropogenic (human-caused) greenhouse gas emissions in 2009 were 5.8 percent below the 2008 total (Table 1). The decline in total emissions-from 6,983 million metric tons carbon dioxide equivalent (MMTCO2e) in 2008 to 6,576 MMTCO2e in 2009-was the largest since emissions have been tracked over the 1990-2009 time frame. It was largely the result of a 419-MMTCO2e drop in carbon dioxide (CO2) emissions (7.1 percent). There was a small increase of 7 MMTCO2e (0.9 percent) in methane (CH4) emissions, and an increase of 8 MMTCO2e (4.9 percent), based on partial data, in emissions of man-made gases with high global warming potentials (high-GWP gases). (Draft estimates for emissions of HFC and PFC

496

Sectional device handling tool  

DOE Patents (OSTI)

Apparatus for remotely handling a device in an irradiated underwater environment includes a plurality of tubular sections interconnected end-to-end to form a handling structure, the bottom section being adapted for connection to the device. A support section is connected to the top tubular section and is adapted to be suspended from an overhead crane. Each section is flanged at its opposite ends. Axially retractable bolts in each bottom flange are threadedly engageable with holes in the top flange of an adjacent section, each bolt being biased to its retracted position and retained in place on the bottom flange. Guide pins on each top flange cooperate with mating holes on adjacent bottom flanges to guide movement of the parts to the proper interconnection orientation. Each section carries two hydraulic line segments provided with quick-connect/disconnect fittings at their opposite ends for connection to the segments of adjacent tubular sections upon interconnection thereof to form control lines which are connectable to the device and to an associated control console.

Candee, Clark B. (Monroeville, PA)

1988-07-12T23:59:59.000Z

497

Section Building Training Manual  

E-Print Network (OSTI)

) to enter search criteria. 3. Enter the term you are searching in. 4. Enter section search criteria (subject Exit #12;6 Adding a Section of a Course 1. Access the Schedule Form (SSASECT). 2. Enter the term code. 14. Tab to the Part of Term field. Enter the Part of Term code (will be 1 for Fall, Spring and Summer

Kelly, Scott David

498

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations March 6, 2008 - 11:54am Addthis...

499

DOE National Interest Electric Transmission Corridors Conference  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Interest Electric Transmission Corridors Conference March 29, 2006 Hilton Garden Hotel Chicago, IL William H. Whitehead General Manager, Transmission Strategy PJM...

500

Electricity Transmission Data Needs Focus Group Results  

U.S. Energy Information Administration (EIA)

power, transmission flows within states, the implications of transmission on capacity expansion decisions and costs; age of transformers and other facilities;