Powered by Deep Web Technologies
Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Transmission Reliability "Load as a Resource" Peer Review Materials...  

Broader source: Energy.gov (indexed) [DOE]

Transmission Reliability "Load as a Resource" Peer Review Materials Now Available Transmission Reliability "Load as a Resource" Peer Review Materials Now Available September 25,...

2

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

components such as power sources, loads,  transformers and components such as power sources, loads,  transformers and 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

3

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

Air Conditioner Testing in WECC,” IEEE Power  Engineering Air Conditioner Modeling, WECC Load Modeling Task  Force in power system studies: WECC progress update,? Power and 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

4

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

Lights HVAC Figure 15 Demand Response and Market AnalysisHVAC Load % of Total Hour of Day Figure 16 Demand Response and Market

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

5

Load-resistant coaxial transmission line  

DOE Patents [OSTI]

A transmission line for downhole tools that make up all or part of a tool string for drilling and production of oil, gas, and geothermal wells that can withstand the dynamic gravitational forces and other accelerations associated with downhole excavations. The transmission line has a metal tube, or outer conductor, that houses a coaxial wire inner conductor. A non-metallic dielectric material is interposed between the inner and outer conductors. The outer and inner conductors and the dielectric are sufficiently compressed together so that independent motion between them is abated. Compression of the components of the transmission line may be achieved by drawing the transmission through one or more dies in order to draw down the outer conductor onto the dielectric, or by expanding the inner conductor against the dielectric using a mandrel or hydraulic pressure. Non-metallic bead segments may be used in aid of the compression necessary to resist the dynamic forces and accelerations of drilling.

Hall, David R.; Fox, Joe

2006-01-03T23:59:59.000Z

6

Non-transposed, three phase transmission lines: a study of their effect on load voltages.  

E-Print Network [OSTI]

TRANSMISSION LINES A S'PJDY OF THEIR EFFECT ON LOAD VOLTAGES A Thesis By Robert Dean Chenoweth August 1951 NON-TRANSPOSED~ THREE PHASE TRANSMISSION LINES A STUDY OF THEIR EFFECT ON LOAD VOLTAGES A Thesis Submitted to the Faculty of the Agricultural... all large blocks of alternating current power are transmitted from the generating station to the load by means of three phase transmission lines. With present day equipment this method is economical and when ~ properly designed gives very...

Chenoweth, Robert Dean

1951-01-01T23:59:59.000Z

7

Aging and service wear of spring-loaded pressure relief valves used in safety-related systems at nuclear power plants  

SciTech Connect (OSTI)

Spring-loaded pressure relief valves (PRVS) are used in some safety-related applications at nuclear power plants. In general, they are used in systems where, during accidents, pressures may rise to levels where pressure safety relief is required for protection of personnel, system piping, and components. This report documents a study of PRV aging and considers the severity and causes of service wear and how it is discovered and corrected in various systems, valve sizes, etc. Provided in this report are results of the examination of the recorded failures and identification of trends and relationships/correlations in the failures when all failure-related parameters are considered. Components that comprise a typical PRV, how those components fail, when they fail, and the current testing frequencies and methods are also presented in detail.

Staunton, R.H.; Cox, D.F. [Oak Ridge National Lab., TN (United States)

1995-03-01T23:59:59.000Z

8

Three-dimensional isotropic perfect lens based on LC-loaded transmission lines  

E-Print Network [OSTI]

An isotropic three-dimentional perfect lens based on cubic meshes of interconnected transmission lines and bulk loads is proposed. The lens is formed by a slab of a loaded mesh placed in between two similar unloaded meshes. The dispersion equations and the characteristic impedances of the eigenwaves in the meshes are derived analytically, with an emphasis on generality. This allows designing of transmission-line meshes with desired dispersion properties. The required backward-wave mode of operation in the lens is realized with simple inductive and capacitive loads. An analytical expression for the transmission through the lens is derived and the amplification of evanescent waves is demonstrated. Factors that influence enhancement of evanescent waves in the lens are studied and the corresponding design criteria are established. A possible realization of the structure is outlined.

P. Alitalo; S. Maslovski; S. Tretyakov

2005-09-16T23:59:59.000Z

9

Investigation of a high impedance magnetically insulated transmission line oscillator with hollow load  

SciTech Connect (OSTI)

A novel high-impedance magnetically insulated transmission line oscillator (MILO) with greatly restrained power deposition on the anode has been investigated. Methods to increase the MILO impedance and decrease the anode current are discussed. A MILO with impedance of 30 {Omega} and power conversion efficiency of 25% is presented by particle-in-cell simulations. Compared with the previous MILO in our lab, the anode current of the proposed MILO is reduced about 50%, the power conversion efficiency doubles, and the power deposition on anode is reduced nearly one half. Furthermore, considerations for reducing the power deposition on load have also been carried out in MILO design, and the load current is reduced to 4.6 kA, only 17% of the total anode current. Finally, a hollow load was introduced to reduce the power deposition density on the load, without decreasing the power conversion efficiency.

Zhou Heng; Shu Ting; Li Zhiqiang [College of Opto-electric Science and Engineering, National University of Defense Technology, Hunan 410073 (China)

2012-09-15T23:59:59.000Z

10

Managing transmission curtailment risk in wholesale power markets  

SciTech Connect (OSTI)

Risk resulting from transmission loading relief calls made by transmission system operators can be managed with information estimated by a statistical model capable of predicting one day in advance the probability that a particular wholesale power transaction might be curtailed. The model predicts this probability with a reasonable degree of accuracy using information on variables that can be obtained publicly. (author)

Morey, Mathew J.; Kirsch, Laurence D.

2009-11-15T23:59:59.000Z

11

Cost-Effectivenessof PhotovoltaicGenerationIn A Transmission-Constrained Load Area of An InterconnectedSystem  

E-Print Network [OSTI]

Cost-Effectivenessof PhotovoltaicGenerationIn A Transmission-Constrained Load Area examines and evaluates the applicability and cost-effectiveness of Photovoltaic(PV) generation the construction of many large power stations with high efficiency, which were located far fi-om customer sites

Gross, George

12

Effect of Large Scale Transmission Limitations on Renewable Energy Load Matching for Western U.S.: Preprint  

SciTech Connect (OSTI)

Based on the available geographically dispersed data for the Western U.S. (excluding Alaska), we analyze to what extent the geographic diversity of these resources can offset their variability. Without energy storage and assuming unlimited energy flows between regions, wind and PV can meet up to 80% of loads in Western U.S. while less than 10% of the generated power is curtailed. Limiting hourly energy flows by the aggregated transmission line carrying capacities decreases the fraction of the load that can be met with wind and PV generation to approximately 70%.

Diakov, V.; Short, W.; Gilchrist, B.

2012-06-01T23:59:59.000Z

13

Transmission  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for Transmission ,...

14

Pressure relief valve/safety relief valve testing  

SciTech Connect (OSTI)

Pressure vessels and piping systems are protected form overpressurization by pressure relief valves. These safety features are required to be tested-inspected on some periodic basis and, in most cases witnessed by a third party inspector. As a result nonconformances found by third parties Westinghouse Hanford Company initiated a task team to develop a pressure safety program. This paper reveals their findings.

Murray, W.A.; Hamm, E.R.; Barber, J.R.

1994-02-01T23:59:59.000Z

15

Strain relief and AlSb buffer layer morphology in GaSb heteroepitaxial films grown on Si as revealed by high-angle annular dark-field scanning transmission electron microscopy  

SciTech Connect (OSTI)

The interfacial misfit (IMF) dislocation array of an epitaxial GaSb film on a Si substrate has been imaged with high-angle annular dark-field scanning transmission electron microscopy (HAADF-STEM). The mismatch strain accommodation through dislocation formation has been investigated using geometric phase analysis (GPA) on HAADF-STEM images with atomic resolution to probe the defects' local strain distribution. These measurements indicate that the lattice parameter of the epitaxial film recovers its bulk value within three unit cells from the interface due to the relaxation through IMF dislocations. The atomic number contrast of the HAADF-STEM images and energy dispersive x-ray spectrometry illustrate the formation of islands of AlSb buffer layer along the interface. The role of the AlSb buffer layer in facilitating the GaSb film growth on Si is further elucidated by investigating the strain field of the islands with the GPA.

Vajargah, S. Hosseini; Couillard, M.; Cui, K. [Department of Material Science and Engineering, McMaster University, 1280 Main St. W., Hamilton, Ontario L8S 4M1 (Canada); Tavakoli, S. Ghanad; Robinson, B.; Kleiman, R. N.; Preston, J. S. [Department of Engineering Physics, McMaster University, Hamilton, Ontario L8S 4M1 (Canada); Botton, G. A. [Department of Material Science and Engineering, McMaster University, 1280 Main St. W., Hamilton, Ontario L8S 4M1 (Canada); Canadian Centre for Electron Microscopy, McMaster University, Hamilton, Ontario L8S 4M1 (Canada)

2011-02-21T23:59:59.000Z

16

Analysis of inservice inspection relief requests  

SciTech Connect (OSTI)

Nuclear Regulatory Commission (NRC) regulations require inspection (ISI) of boiling or pressurized water-cooled nuclear power plants be performed in accordance with a referenced edition and addenda of Section XI, ``Rules for Inservice Inspection of Nuclear Power Plant components,`` of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. The regulations permit licensees to request relief from the NRC from specific ASME Code requirements that are determined to be impractical for the specific licensee. The NRC evaluates these requests and may grant such relief, but the NRC may also impose alternative or augmented inspections to assure structural reliability. The purpose,of this task was to evaluate the basis for ISI nondestructive examination (NDE) relief requests and to evaluate the effect of proposed ASME Code changes that would reduce the need for such requests or provide for more complete information in relief requests. This report contains the results of an analysis of an ISI relief request data base that has been expanded to include 1195 ISI relief requests versus the 296 relief requests covered in the first report in April 1987, EGG-SD-7430. Also relief requests were added to the data base which came from both first and second 10-year inspection intervals for several facilities. This provided the means to analyze the effect of recently approved ASME Code cases and updated Code requirements, some of which have been published as a result of earlier work on this task.

Aldrich, D.A.; Cook, J.F.

1989-08-01T23:59:59.000Z

17

E-Print Network 3.0 - assistance relief services Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Relief Options Paper October 2008 Summary: : A mortgage relief scheme is essentially a public support service, providing financial assistance... relief assistance in NSW and...

18

Omega Transmission Lines  

E-Print Network [OSTI]

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

19

Helium pressures in RHIC vacuum cryostats and relief valve requirements from magnet cooling line failure  

SciTech Connect (OSTI)

A catastrophic failure of the RHIC magnet cooling lines, similar to the LHC superconducting bus failure incident, would pressurize the insulating vacuum in the magnet and transfer line cryostats. Insufficient relief valves on the cryostats could cause a structural failure. A SINDA/FLUINT{reg_sign} model, which simulated the 4.5K/4 atm helium flowing through the magnet cooling system distribution lines, then through a line break into the vacuum cryostat and discharging via the reliefs into the RHIC tunnel, had been developed to calculate the helium pressure inside the cryostat. Arc flash energy deposition and heat load from the ambient temperature cryostat surfaces were included in the simulations. Three typical areas: the sextant arc, the Triplet/DX/D0 magnets, and the injection area, had been analyzed. Existing relief valve sizes were reviewed to make sure that the maximum stresses, caused by the calculated maximum pressures inside the cryostats, did not exceed the allowable stresses, based on the ASME Code B31.3 and ANSYS results. The conclusions are as follows: (1) The S/F simulation results show that the highest internal pressure in the cryostats, due to the magnet line failure, is {approx}37 psig (255115 Pa); (2) Based on the simulation, the temperature on the cryostat chamber, INJ Q8-Q9, could drop to 228 K, which is lower than the material minimum design temperature allowed by the Code; (3) Based on the ASME Code and ANSYS results, the reliefs on all the cryostats inside the RHIC tunnel are adequate to protect the vacuum chambers when the magnet cooling lines fail; and (4) In addition to the pressure loading, the thermal deformations, due to the temperature decrease on the cryostat chambers, could also cause a high stress on the chamber, if not properly supported.

Liaw, C.J.; Than, Y.; Tuozzolo, J.

2011-03-28T23:59:59.000Z

20

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

32   Figure  13  Voltage  Oscillation  Test.   The  applied calculated from measurements for the voltage oscillation from  measurements  for  the  voltage  oscillation 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

the set temperature ? Power loss and initial electronicsprotection even at total power loss Table 5 provides thenot activate with total power loss or electronics shutdown ?

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

22

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

2009.   Inverter  Test Procedures Solar Generation Impact Conditioner Testing Procedures  Appendix B: Air Conditioner air conditioner testing procedures and results from studies 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

23

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

Unit Evaporator Coil Size (Tons) Compressor Type Refrigerant SEER FANUnit Evaporator Coil Size (Tons) Compressor Type Refrigerant SEER FANUnit Evaporator Coil Size (Tons) Compressor Type Refrigerant SEER FAN

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

24

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

to be the compact fluorescent bulbs (CFBs) that the engineerbulbs with compact fluorescent bulbs (CFBs) continues to

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

25

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

pump heating fraction, EF heatpump , shall be the fraction q P p P q (P) (Q) (B) Lighting Washing Heating 0.1F heatpump0.3F heatpump Cooling Refrigeration Z q Hotwater Plugs Z p (

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

26

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

2, 2007, report issued by EPRI under SCE contract.   Reza, 2, 2007, report issued by EPRI under SCE contract. R. Bravo,System Stability and Control, EPRI Power System Engineering

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

27

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

commercial building energy use and cost analysis. With input of building layout, construction types, space usage,

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

28

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

solar insulation.    PV variable voltage input DC-DC converter with peak power trackersolar insolation.    PV variable voltage input DC-DC converter with peak power tracker

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

29

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

like hardware (PMU), software and data communication. TheSpecifications and Technical Data PMU Model Number of NumberPMU Specifications and Technical Data ..

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

30

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

R22 PMAXLow (PSI) Phase Refrigerant Charge (LBS) Voltage (V)LRA (AMPS) Phase Refrigerant Charge (LBS) Voltage (V) PMAXR22 PMAXLow (PSI) Phase Refrigerant Charge (LBS) Voltage (V)

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

31

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

9   1.2.1.   Air Conditioner Testing and 16   2.0   Air Conditioner Results of Residential Air Conditioner Testing in WECC,” 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

32

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

value for all renewable resource and load zone combinationsvalue for all renewable resource and load zone combinationsidentify attractive renewable resources and the transmission

Mills, Andrew

2010-01-01T23:59:59.000Z

33

The humanitarian relief supply chain : analysis of the 2004 South East Asia earthquake and Tsunami  

E-Print Network [OSTI]

Humanitarian relief supply chains are not well documented. This thesis describes humanitarian relief supply chains in general and those specifically utilized in the 2004 South East Asia Earthquake and Tsunami relief effort. ...

Russell, Timothy Edward

2005-01-01T23:59:59.000Z

34

Transmission Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Return to Daylight Saving Time Posted: 2232015 Effective Date: 382015 This document provides the procedure for reserving and scheduling transmission that spans the time change...

35

Complex Dynamics of Blackouts in Power Transmission Systems B. A. Carreras and V. E. Lynch  

E-Print Network [OSTI]

the loss of load due to transmission lines reaching their load limits but no line outages. The second type to a dynamic equilibrium. Blackouts are modeled by overloads and outages of transmission lines determined

36

Transmission System Performance Analysis for High-Penetration Photovoltaics  

SciTech Connect (OSTI)

This study is an assessment of the potential impact of high levels of penetration of photovoltaic (PV) generation on transmission systems. The effort used stability simulations of a transmission system with different levels of PV generation and load.

Achilles, S.; Schramm, S.; Bebic, J.

2008-02-01T23:59:59.000Z

37

Blast overpressure relief using air vacated buffer medium  

E-Print Network [OSTI]

Blast waves generated by intense explosions cause damage to structures and human injury. In this thesis, a strategy is investigated for relief of blast overpressure resulting from explosions in air. The strategy is based ...

Avasarala, Srikanti Rupa

2009-01-01T23:59:59.000Z

38

Transmission Services J7000  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Business Unit - J7300 CRSP - DSW - RMR Open Access Transmission Tariff Management Transmission Service Requests Interconnection Requests OASIS...

39

Statistical Performance Evaluation Of Soft Seat Pressure Relief Valves  

SciTech Connect (OSTI)

Risk-based inspection methods enable estimation of the probability of failure on demand for spring-operated pressure relief valves at the United States Department of Energy's Savannah River Site in Aiken, South Carolina. This paper presents a statistical performance evaluation of soft seat spring operated pressure relief valves. These pressure relief valves are typically smaller and of lower cost than hard seat (metal to metal) pressure relief valves and can provide substantial cost savings in fluid service applications (air, gas, liquid, and steam) providing that probability of failure on demand (the probability that the pressure relief valve fails to perform its intended safety function during a potentially dangerous over pressurization) is at least as good as that for hard seat valves. The research in this paper shows that the proportion of soft seat spring operated pressure relief valves failing is the same or less than that of hard seat valves, and that for failed valves, soft seat valves typically have failure ratios of proof test pressure to set pressure less than that of hard seat valves.

Harris, Stephen P.; Gross, Robert E.

2013-03-26T23:59:59.000Z

40

Loads Providing Ancillary Services: Review of International Experience...  

Broader source: Energy.gov (indexed) [DOE]

Trading and Transmission Arrangement BUL Balancing Up Loads DSR Demand Side Response CERTS Consortium for Electric Reliability Technology Solutions EEX European...

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Transmission INTRODUCTION  

E-Print Network [OSTI]

, to a significant degree, on a well-functioning wholesale power market. The transmission system is integral the consequences of a poorly designed wholesale power market, and the Council does not want to see those Regulatory Commission began taking actions to further facilitate competition in wholesale power supply. Today

42

Online Transmission Line Loadability Assessment Using Synchrophasor Measurements  

E-Print Network [OSTI]

a stable operation. Transmission line loading limits are also essential to deter- mine locational marginal loading margins provide a useful metric to operate the power sys- tem to satisfy demands while ensuring prices in power markets. Therefore, the assessment of transmission line loadability under various

Liberzon, Daniel

43

Transmission Workshop  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof theRestorationAdvisoryManagement andTopKnow? |Transmission

44

New approach for modelling distributed MEMS transmission lines  

E-Print Network [OSTI]

New approach for modelling distributed MEMS transmission lines K. Topalli, M. Unlu, S. Demir, O for the distributed MEMS transmission line (DMTL) structures. In this new model, the MEMS bridges that are used as the loading elements of the DMTL structures are represented as low-impedance transmission lines, rather than

Akin, Tayfun

45

Plug Load  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006Photovoltaic Theory andVelocityPlatinum-LoadingPlug-Load Sign In

46

Optoelectronics 514 Transmission Hologram Transmission Hologram  

E-Print Network [OSTI]

Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

Collins, Gary S.

47

Transmission Lines Emulating Moving Media  

E-Print Network [OSTI]

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

48

Spinning Reserve from Pump Load: A Technical Findings Report to the California Department of Water Resources  

SciTech Connect (OSTI)

The Oak Ridge National Laboratory (ORNL), at the request of the California Energy Commission and the U.S. Department of Energy, is investigating opportunities for electrical load to provide the ancillary service of spinning reserve to the electric grid. The load would provide this service by stopping for a short time when there is a contingency on the grid such as a transmission line or generator outage. There is a possibility that a significant portion of the California Independent System Operator's (CAISO's) spinning reserve requirement could be supplied from the California Department of Water Resources (CDWR) pumping load. Spinning reserve has never been supplied from load before, and rule changes would be needed to allow it. In this report, we are presenting technical findings on the possibility of supplying spinning reserve from pumping system load. In parallel, we are pursuing the needed rule changes with the North American Electric Reliability Council (NERC), the Federal Energy Regulatory Commission (FERC), the Western Electricity Coordinating Council (WECC), and the CAISO. NERC and FERC have agreed that they have no prohibition against supplying spinning reserve from load. The WECC Minimum Operability Reliability Criteria working group has agreed that the concept should be considered, and they are presently discussing the needed tariff and rule changes. Presently, spinning reserve is provided by generation that is actually spinning but is operating at low power levels and can be ramped up quickly to provide reserve power. In a sense, this is an inefficient and environmentally unfriendly way of providing reserves because it requires the generator to operate at a low power level that may be inefficient and may discharge more pollutants per kW than operating at rated power. It would be better if this generation capacity were in a position to bid into the energy market. Providing an additional supply of spinning reserve would tend to reduce prices for both reserves and the regular electric energy market. The CAISO is presently in the process of redesigning its market rules for ancillary services. The time is right to pursue this opportunity to supply spinning reserve from load. It is our hope that the CDWR will endorse this recommendation. ORNL will then work with FERC, NERC, WECC, and the CAISO to obtain the needed rule changes. This project would provide the CDWR with another option in the complex process of obtaining its energy at the lowest possible cost, while at the same time providing more flexibility to the ISO and relief to the energy market. After this project is implemented in California, we hope that the practice spreads across the nation, allowing much more flexibility in energy markets and increasing the availability of reserve services.

Kirby, BJ

2005-05-06T23:59:59.000Z

49

Load Management for Industry  

E-Print Network [OSTI]

In the electric utility industry, load management provides the opportunity to control customer loads to beneficially alter a utility's load curve Load management alternatives are covered. Load management methods can be broadly classified into four...

Konsevick, W. J., Jr.

1982-01-01T23:59:59.000Z

50

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

51

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

52

Merchant transmission investment  

E-Print Network [OSTI]

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

53

2012 Transmission and Energy Storage Peer Review Presentations Available  

Broader source: Energy.gov [DOE]

Presentations from theTransmission Reliability R&D Load as a Resource peer review and Energy Storage Systems peer review, both held in September 2012, are now available.

54

A Personification of Demos on a New Attic Document Relief  

E-Print Network [OSTI]

- vations on the north slope of the Acropolis conducted by Oscar Broneer ke v in gl owac ki448 and the American School of Classical Studies at Athens prior to World War II. As with the examples found elsewhere on the slopes of the citadel, it is most likely... Oscar Broneer for permission to study the material from his excavations on the north and east slopes of the Acropolis from 1931 to 1939. For photographs of document reliefs and permission to reproduce them here I am grateful to the First and Third...

Glowacki, Kevin

2003-01-01T23:59:59.000Z

55

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

56

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, R.B.

1985-08-15T23:59:59.000Z

57

Integrated Transmission and Distribution Control  

SciTech Connect (OSTI)

Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

2013-01-16T23:59:59.000Z

58

Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 4. Evaluation of other loads and load combinations  

SciTech Connect (OSTI)

Six topical areas were covered by the Task Group on Other Dynamic Loads and Load Combinations as described below: Event Combinations - dealing with the potential simultaneous occurrence of earthquakes, pipe ruptures, and water hammer events in the piping design basis; Response Combinations - dealing with multiply supported piping with independent inputs, the sequence of combinations between spacial and modal components of response, and the treatment of high frequency modes in combination with low frequency modal responses; Stress Limits/Dynamic Allowables - dealing with inelastic allowables for piping and strain rate effects; Water Hammer Loadings - dealing with code and design specifications for these loadings and procedures for identifying potential water hammer that could affect safety; Relief Valve Opening and Closing Loads - dealing with the adequacy of analytical tools for predicting the effects of these events and, in addition, with estimating effective cycles for fatigue evaluations; and Piping Vibration Loads - dealing with evaluation procedures for estimating other than seismic vibratory loads, the need to consider reciprocating and rotary equipment vibratory loads, and high frequency vibratory loads. NRC staff recommendations or regulatory changes and additional study appear in this report.

Not Available

1984-12-01T23:59:59.000Z

59

Economic Congestion Relief Across Multiple Regions Requires Tradable Physical Flow-gate Rights  

E-Print Network [OSTI]

PWP-076 Economic Congestion Relief Across Multiple Regions Requires Tradable Physical Flow.ucei.berkeley.edu/ucei #12;Economic Congestion Relief Across Multiple Regions Requires Tradable Physical Flow-gate Rights- mission use. The North American Electric Reliability Council NERC is in the process of implementing

California at Berkeley. University of

60

NREL: Transmission Grid Integration - Glossary of Transmission...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

capacity). Contingency events are big (many megawatt) and fast (within a few cycles). Demand response Voluntary (and compen-sated) load reduction used as a bulk system...

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Coiled transmission line pulse generators  

DOE Patents [OSTI]

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

62

Transmission Commercial Project Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

63

Automated manual transmission controller  

DOE Patents [OSTI]

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

64

Improve the design of fire emergency relief systems  

SciTech Connect (OSTI)

In recognition of the potential severe consequences of a process vessel rupture under fire exposure, industry codes such as the National Fire Protection Association (NFPA) 30 and the American Petroleum Institute (API) Standard 2000 have been established for the specification of emergency relief systems (ERSs). The intent is to reduce the risk of human injury and asset losses associated with process plant fires. These codes are largely prescriptive in nature. That is, they provide specific details on how to achieve safe design. Prescriptive standards are easy to apply, because they are simplified approaches which generally apply to many (but not all) situations. But they also have limitations, including the tendency to result in, at best, suboptimal (overly conservative) designs, and in some instances potentially unsafe designs. As the fire community moves toward performance-based standards for building protection, perhaps it is time to consider a similar approach for vessel protection in a fire. The design issues addressed in this article include: Use of heat input based on actual fuel burning rate, heat of combustion, and flame emissive power, vs. NFPA 30 and API 2000 heat-input equations; Effect of drainage (from vessel to sump) on fire duration, rather than heat input; Use of risk assessment to determine the relative frequency of fire and process-induced incidents; and design for containment, rather than vessel protection when fire probability is low

Stickles, R.P.; Melhem, G.A.; Eckhardt, D.R.

1995-11-01T23:59:59.000Z

65

Oregon/Transmission | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(UtilityCounty, Michigan:OregonTransmissionHeader.png Roadmap Agency Links Local

66

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

67

School of Art & Design 3D Printing of Relief Forms onto Ceramic Tiles  

E-Print Network [OSTI]

School of Art & Design 3D Printing of Relief Forms onto Ceramic Tiles Lead: Lharne Shaw 3D printing tile production. It will also assess the feasibility of introducing a 3D slip printing system into both

Evans, Paul

68

Picking up the pieces : transitional shelters for disaster relief in the northern mountainous regions of Pakistan  

E-Print Network [OSTI]

This thesis seeks to tackle a complex problem - disaster housing relief - from the angle of architecture design discipline and attempts to find a logical approach to solve such a problem via an in depth examination of a ...

Lee, Weifeng Victoria

2006-01-01T23:59:59.000Z

69

Working Families Tax Relief Act of 2004 (released in AEO2005)  

Reports and Publications (EIA)

The Working Families Tax Relief Act of 2004 was signed into law on October 13, 2004. Primarily, the Act reduces taxes for individuals and businesses. At least two provisions relate to energy: Depletion of marginal properties and qualified vehicles.

2005-01-01T23:59:59.000Z

70

Transitional development within shifting spheres of conflict : the Union of Palestinian Medical Relief Committee  

E-Print Network [OSTI]

This thesis examines how an NGO can function and create change within the shifting domains of Palestinian stability and conflict through the case study of the Union of Palestinian Medical Relief Committee (UPMRC). Palestinian ...

Erekat, Dana (Dana M.)

2009-01-01T23:59:59.000Z

71

Electric Transmission Lines (Nebraska)  

Broader source: Energy.gov [DOE]

The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway crossings. This section contains general regulations...

72

Patterns of transmission investment  

E-Print Network [OSTI]

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

73

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

Authors James Bartridge Judy Grau Mark Hesters Don Kondoleon Chuck Najarian Contributing Authors Grace: Bartridge, James, Judy Grau, Mark Hesters, Don Kondoleon, Chuck Najarian. 2007 Strategic Transmission

74

Collaborative Transmission Technology Roadmap  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

techniques, and tools to analyze data from power quality recorders Size-up demand response opportunities Transmission level monitoring with PMUs is not sufficient and needs to...

75

Load Component Database of Household Appliances and Small Office Equipment  

SciTech Connect (OSTI)

This paper discusses the development of a load component database for household appliances and office equipment. To develop more accurate load models at both transmission and distribution level, a better understanding on the individual behaviors of home appliances and office equipment under power system voltage and frequency variations becomes more and more critical. Bonneville Power Administration (BPA) has begun a series of voltage and frequency tests against home appliances and office equipments since 2005. Since 2006, Researchers at Pacific Northwest National Laboratory has collaborated with BPA personnel and developed a load component database based on these appliance testing results to facilitate the load model validation work for the Western Electricity Coordinating Council (WECC). In this paper, the testing procedure and testing results are first presented. The load model parameters are then derived and grouped. Recommendations are given for aggregating the individual appliance models to feeder level, the models of which are used for distribution and transmission level studies.

Lu, Ning; Xie, YuLong; Huang, Zhenyu; Puyleart, Francis; Yang, Steve

2008-07-24T23:59:59.000Z

76

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

77

Transmission Enhancement Technology Report  

E-Print Network [OSTI]

of Existing Transmission 6 5. Potential New Equipment to Improve Transmission Capability 9 6. Potential New parties for the sites that should be studied as potential locations for new generation and to consult lignite and wind energy. " As per the requirements of the above-referenced Congressional direction

78

The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations  

SciTech Connect (OSTI)

Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

Kirby, Brendan J [ORNL

2006-07-01T23:59:59.000Z

79

Load sensing system  

DOE Patents [OSTI]

A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast

Sohns, Carl W. (Oak Ridge, TN); Nodine, Robert N. (Knoxville, TN); Wallace, Steven Allen (Knoxville, TN)

1999-01-01T23:59:59.000Z

80

Loading margin Stable operating  

E-Print Network [OSTI]

Linear approximation at p1 Actual loading margin Loadingmargin Parameter p p1 p2 p3 IEEE Transactions collapse. Linear and quadratic estimates to the variation of the loading margin with respect to any sys power support, wheeling, load model param- eters, line susceptance, and generator dispatch. The accuracy

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

82

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

83

Multi-Carrier Multiple Access is Sum-Rate Optimal for Block Transmissions over Circulant ISI Channels*  

E-Print Network [OSTI]

. Single-user multi-carrier transmissions loaded according to the CSI-based "water-pouring"principleMulti-Carrier Multiple Access is Sum-Rate Optimal for Block Transmissions over Circulant ISI at the transmitter. Cir- culant ISI channels are ensured either with cyclic pre`xed block transmissions

Giannakis, Georgios

84

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

85

Down hole transmission system  

DOE Patents [OSTI]

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

86

Transmission Services Bulletin  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Standard Time On the first Sunday in November Transmission Services sets clocks from Daylight Savings Time (PD) back to Standard Time (PS). At 02:00 the time becomes 01:00. In...

87

Transmission Grid Integration  

Broader source: Energy.gov [DOE]

The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

88

Designing electricity transmission auctions  

E-Print Network [OSTI]

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

89

National Electric Transmission Congestion Study Webinars | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

90

Flexible Transmission in the Smart Grid  

E-Print Network [OSTI]

Planning . 102 vi Transmission Line Maintenance Scheduling 103 Just-in-time Transmission 103 Flexible Transmission in the Smart Grid

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

91

Honda Transmission Technical Center  

High Performance Buildings Database

Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

92

Bulk Power Transmission Study  

E-Print Network [OSTI]

BULK POWER TRANSMISSION STUDY TOMMY JOH~ P. E. Manager of Resource Recovery Waste Management of North America, Inc. Houston, Texas Texans now have a choice. We can become more efficient and maintain our standard of living, or we can... continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled...

John, T.

93

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

94

Reliable Packet Transmissions in Multipath Routed Wireless Networks  

E-Print Network [OSTI]

loss (PPL) in wireless networks. Path diversification uses erasure codes and multiple paths. We show that for low PPL, blind load balancing outperforms single-path transmission. In the second how to distribute the fragments for minimized PPL, and maximized efficiency given a bound on PPL. We

Valaee, Shahrokh

95

Estimating the Actual Cost of Transmission System Congestion  

E-Print Network [OSTI]

of the utility's generation, load and tie-line flows over the study time period. Due to the common lack by most be used by a utility to estimate the actual cost of congestion on its transmission system using limited interconnected grid (i.e., the Eastern Interconnect), costs for the utility's generators, and then hourly values

96

Energy Efficient Transmissions in MIMO Cognitive Radio Networks  

E-Print Network [OSTI]

Energy Efficient Transmissions in MIMO Cognitive Radio Networks Liqun Fu The Institute of Network@ie.cuhk.edu.hk Abstract--In this paper, we consider energy efficient transmis- sions for MIMO cognitive radio networks on the traffic load of the secondary system. Index Terms--Cognitive radio networks, MIMO, Energy- efficiency. I

Huang, Jianwei

97

Analysis of HFIR pressurizer pump overspeed transients and relief valve performance  

SciTech Connect (OSTI)

The pressurizer pump overspeed transients at the High Flux Isotope Reactor (HFIR) fall in the category of {open_quotes}increase in coolant inventory transients.{close_quotes} They are among the accident transients to be performed for Chapter 15 of the HFIR safety analysis report (SAR). The pressurizer pump speed starting to increase inadvertently to reach its maximum speed of 3,560 rpm while the reactor operates under normal conditions is the cause of this transient. Increased primary coolant system pressure due to increased pressurizer pump flow into the primary coolant head tank challenges the relief valves to open. If the relief valves do not open, increased primary coolant system pressure will challenge the integrity of the high pressure boundary. Two sets of analyses were performed to analyze the pressurizer pump overspeed transients. The purpose of the first analysis is to estimate how long it will take for the relief valves to open under different conditions and whether or not they will chatter or flutter for a considerable amount of time. The analysis estimates relief valve performance and stability using four different relief valve subsystem models. The relief valve subsystem models are not attached to the primary coolant system model. Vigorous pressure oscillations were produced in all of the computations performed as part of the first analysis. The second analysis includes new simulations of the pressurizer pump overspeed transients that were previously simulated using the RELAP5 thermal-hydraulic computer code. The HFIRSYS, High Flux Isotope Reactor System Transient Analysis computer code, was utilized for these simulations providing referable results for comparisons. The increased pressurizer pump flow due to runaway pressurizer pump speed pressurizes the primary coolant system. The assumptions were made in such a way to form constraining conditions at initiation of and during the transients to generate as high an overpressure situation as possible.

Sozer, M.C.

1992-09-11T23:59:59.000Z

98

ANALYSIS OF SAFETY RELIEF VALVE PROOF TEST DATA TO OPTIMIZE LIFECYCLE MAINTENANCE COSTS  

SciTech Connect (OSTI)

Proof test results were analyzed and compared with a proposed life cycle curve or hazard function and the limit of useful life. Relief valve proof testing procedures, statistical modeling, data collection processes, and time-in-service trends are presented. The resulting analysis of test data allows for the estimation of the PFD. Extended maintenance intervals to the limit of useful life as well as methodologies and practices for improving relief valve performance and reliability are discussed. A generic cost-benefit analysis and an expected life cycle cost reduction concludes that $90 million maintenance dollars might be avoided for a population of 3000 valves over 20 years.

Gross, Robert; Harris, Stephen

2007-08-01T23:59:59.000Z

99

Load regulating expansion fixture  

DOE Patents [OSTI]

A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils is disclosed. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components. 1 fig.

Wagner, L.M.; Strum, M.J.

1998-12-15T23:59:59.000Z

100

Load regulating expansion fixture  

DOE Patents [OSTI]

A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components.

Wagner, Lawrence M. (San Jose, CA); Strum, Michael J. (San Jose, CA)

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Load sensing system  

DOE Patents [OSTI]

A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast inventories of stored nuclear material can be continuously monitored and inventoried of minimal cost. 4 figs.

Sohns, C.W.; Nodine, R.N.; Wallace, S.A.

1999-05-04T23:59:59.000Z

102

Hybrid Transmission Corridor study  

SciTech Connect (OSTI)

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

103

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

104

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

SciTech Connect (OSTI)

California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

2008-07-01T23:59:59.000Z

105

16 Load Data Cleansing and Bus Load  

E-Print Network [OSTI]

-to-day operations, system analysis in smart grids, system visualization, system performance reliability, energy..............................................................................................................397 #12;376 Smart Grids The load forecast generally provides annual peak values for the whole system saving, and accuracy in system planning [1­4]. * This work is partly supported by a collaborative

Wang, Ke

106

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

107

contingency Nominal loading margin  

E-Print Network [OSTI]

is estimated. First a nose curve is computed by continuation to obtain a nominal loading margin. Then linear and the very fast computation of the linear estimates. Keywords: Power system security, contingency analy- sis formulas derived in [4]. The computations are summarized: 1 A pattern of load increase, generator dispatch

108

Low Frequency Transmission Final Project Report  

E-Print Network [OSTI]

to HVDC transmission and conventional AC transmission in different configurations. The issue is quite

109

Impact of relief accuracy on flood simulations and road network vulnerability analysis  

E-Print Network [OSTI]

network by forcing users to take detours. In a risk preventive viewpoint, the network administrator has 1 Impact of relief accuracy on flood simulations and road network vulnerability analysis Jean in the water level and its consequences on the road network vulnerability. The first part focuses

Paris-Sud XI, Université de

110

ABSTRACT. The stress-relief cracking (SRC) susceptibility of single-pass welds  

E-Print Network [OSTI]

steel, HCM2S, has been evaluated and compared to 2.25Cr-1Mo steel using Gleeble thermal simulation and pressure vessels for chemical and fossil power plants. Many components in these power plants oper- ate techniques. HCM2S was found to be more susceptible to stress-relief cracking than 2.25Cr-1Mo steel. Simulated

DuPont, John N.

111

Scalable Load Distribution and Load Balancing for Dynamic Parallel Programs  

E-Print Network [OSTI]

shown that the algorithm scales according to the definition of scalability given following. LoadScalable Load Distribution and Load Balancing for Dynamic Parallel Programs E. Berger and J. C of an integrated load distribution-load balancing algorithm which was targeted to be both efficient and scalable

Berger, Emery

112

Borehole data transmission apparatus  

DOE Patents [OSTI]

A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

1993-01-01T23:59:59.000Z

113

Autonomous data transmission apparatus  

DOE Patents [OSTI]

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

114

Autonomous data transmission apparatus  

DOE Patents [OSTI]

A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

Kotlyar, O.M.

1997-03-25T23:59:59.000Z

115

Borehole data transmission apparatus  

DOE Patents [OSTI]

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

116

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

SciTech Connect (OSTI)

The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS and WinDS). The authors and general location of the 40 detailed transmission studies included in our review are illustrated in Figure ES-1. As discussed in the body of the report, these studies vary considerably in scope, authorship, objectives, methodology, and tools. Though we recognize this diversity and are cognizant that comparisons among these studies are therefore somewhat inappropriate, we nonetheless emphasize such simple comparisons in this report. We do so in order to improve our understanding of the range of transmission costs needed to access greater quantities of wind, and to highlight some of the drivers of those costs. In so doing, we gloss over many important details and differences among the studies in our sample. In emphasizing simple comparisons, our analysis focuses primarily on the unit cost of transmission implied by each of the studies. The unit cost of transmission for wind in $/kW terms on a capacity-weighted basis is estimated by simply dividing the total transmission cost in a study by the total amount of incremental generation capacity (wind and non-wind) modeled in that study. In so doing, this metric assumes that within any individual study all incremental generation capacity imposes transmission costs in proportion to its nameplate capacity rating. The limitations to this approach are described in some detail in the body of the report.

Mills, Andrew D.; Wiser, Ryan; Porter, Kevin

2009-02-02T23:59:59.000Z

117

Pulse transmission transmitter including a higher order time derivate filter  

DOE Patents [OSTI]

Systems and methods for pulse-transmission low-power communication modes are disclosed. A pulse transmission transmitter includes: a clock; a pseudorandom polynomial generator coupled to the clock, the pseudorandom polynomial generator having a polynomial load input; an exclusive-OR gate coupled to the pseudorandom polynomial generator, the exclusive-OR gate having a serial data input; a programmable delay circuit coupled to both the clock and the exclusive-OR gate; a pulse generator coupled to the programmable delay circuit; and a higher order time derivative filter coupled to the pulse generator. The systems and methods significantly reduce lower-frequency emissions from pulse transmission spread-spectrum communication modes, which reduces potentially harmful interference to existing radio frequency services and users and also simultaneously permit transmission of multiple data bits by utilizing specific pulse shapes.

Dress Jr., William B.; Smith, Stephen F.

2003-09-23T23:59:59.000Z

118

Load research manual. Volume 3. Load research for advanced technologies  

SciTech Connect (OSTI)

This three-volume manual presents technical guidelines for electric utility load research. Special attention is given to issues raised by the load data reporting requirements of the Public Utility Regulatory Policies Act of 1978 and to problems faced by smaller utilities that are initiating load research programs. The manual includes guides to load research literature and glossaries of load research and statistical terms. In Volume 3, special load research procedures are presented for solar, wind, and cogeneration technologies.

None

1980-11-01T23:59:59.000Z

119

Load Monitoring CEC/LMTF Load Research Program  

SciTech Connect (OSTI)

This white paper addresses the needs, options, current practices of load monitoring. Recommendations on load monitoring applications and future directions are also presented.

Huang, Zhenyu; Lesieutre, B.; Yang, Steve; Ellis, A.; Meklin, A.; Wong, B.; Gaikwad, A.; Brooks, D.; Hammerstrom, Donald J.; Phillips, John; Kosterev, Dmitry; Hoffman, M.; Ciniglio, O.; Hartwell, R.; Pourbeik, P.; Maitra, A.; Lu, Ning

2007-11-30T23:59:59.000Z

120

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Integration of MHD load models with circuit representations the Z generator.  

SciTech Connect (OSTI)

MHD models of imploding loads fielded on the Z accelerator are typically driven by reduced or simplified circuit representations of the generator. The performance of many of the imploding loads is critically dependent on the current and power delivered to them, so may be strongly influenced by the generators response to their implosion. Current losses diagnosed in the transmission lines approaching the load are further known to limit the energy delivery, while exhibiting some load dependence. Through comparing the convolute performance of a wide variety of short pulse Z loads we parameterize a convolute loss resistance applicable between different experiments. We incorporate this, and other current loss terms into a transmission line representation of the Z vacuum section. We then apply this model to study the current delivery to a wide variety of wire array and MagLif style liner loads.

Jennings, Christopher A.; Ampleford, David J.; Jones, Brent Manley; McBride, Ryan D.; Bailey, James E.; Jones, Michael C.; Gomez, Matthew Robert.; Cuneo, Michael Edward; Nakhleh, Charles; Stygar, William A.; Savage, Mark Edward; Wagoner, Timothy C.; Moore, James K.

2013-03-01T23:59:59.000Z

122

Composite Load Model Evaluation  

SciTech Connect (OSTI)

The WECC load modeling task force has dedicated its effort in the past few years to develop a composite load model that can represent behaviors of different end-user components. The modeling structure of the composite load model is recommended by the WECC load modeling task force. GE Energy has implemented this composite load model with a new function CMPLDW in its power system simulation software package, PSLF. For the last several years, Bonneville Power Administration (BPA) has taken the lead and collaborated with GE Energy to develop the new composite load model. Pacific Northwest National Laboratory (PNNL) and BPA joint force and conducted the evaluation of the CMPLDW and test its parameter settings to make sure that: • the model initializes properly, • all the parameter settings are functioning, and • the simulation results are as expected. The PNNL effort focused on testing the CMPLDW in a 4-bus system. An exhaustive testing on each parameter setting has been performed to guarantee each setting works. This report is a summary of the PNNL testing results and conclusions.

Lu, Ning; Qiao, Hong (Amy)

2007-09-30T23:59:59.000Z

123

Patterns of Transmission Investment  

E-Print Network [OSTI]

long term performance contracts with a developer of an HVDC transmission link to expand “interconnection” capacity between TSOs with no or limited interconnections and with large sustained differences in prices. Merchant investments supported... truly separate AC networks. For example, by building HVDC inter-connectors between two separate networks, opportunities to increase trades of power from high price to low priced areas can be exploited. The HVDC link between the England and France...

Joskow, Paul

2006-03-14T23:59:59.000Z

124

DOE Transmission Workshop  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Deliciouscritical_materials_workshop_presentations.pdf MoreProgramofContract at itsSelections for ReducingTransmission

125

Geothermal Resources and Transmission Planning  

Broader source: Energy.gov [DOE]

This project addresses transmission-related barriers to utility-scale deployment of geothermal electric generation technologies.

126

Boardman to Hemingway Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

127

Transmission Issues Policy Steering Committee  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business Practices CommitteesTeams Joint Operating Committee Transmission Issues Policy Steering Committee Customer Training Interconnection Notices Rates Standards of...

128

The integration of renewable energy sources into electric power transmission systems  

SciTech Connect (OSTI)

Renewable energy technologies such as photovoltaics, solar thermal power plants, and wind turbines are nonconventional, environmentally attractive sources of energy that can be considered for electric power generation. Many of the areas with abundant renewable energy resources (very sunny or windy areas) are far removed from major load centers. Although electrical power can be transmitted over long distances of many hundreds of miles through high-voltage transmission lines, power transmission systems often operate near their limits with little excess capacity for new generation sources. This study assesses the available capacity of transmission systems in designated abundant renewable energy resource regions and identifies the requirements for high-capacity plant integration in selected cases. In general, about 50 MW of power from renewable sources can be integrated into existing transmission systems to supply local loads without transmission upgrades beyond the construction of a substation to connect to the grid. Except in the Southwest, significant investment to strengthen transmission systems will be required to support the development of high-capacity renewable sources of 1000 MW or greater in areas remote from major load centers. Cost estimates for new transmission facilities to integrate and dispatch some of these high-capacity renewable sources ranged from several million dollars to approximately one billion dollars, with the latter figure an increase in total investment of 35%, assuming that the renewable source is the only user of the transmission facility.

Barnes, P.R.; Dykas, W.P.; Kirby, B.J.; Purucker, S.L. [Oak Ridge National Lab., TN (United States); Lawler, J.S. [Univ. of Tennessee, Knoxville, TN (United States)

1995-07-01T23:59:59.000Z

129

Investigation Of Adhesion Formation In New Stainless Steel Trim Spring Operated Pressure Relief Valves  

SciTech Connect (OSTI)

Examination of proof test data for new (not previously installed) stainless steel (SS) trim spring operated pressure relief valves (SOPRV) reveals that adhesions form between the seat and disc in about 46% of all such SOPRV. The forces needed to overcome these adhesions can be sufficiently large to cause the SOPRV to fail its proof test (FPT) prior to installation. Furthermore, a significant percentage of SOPRV which are found to FPT are also found to ''fail to open'' (FTO) meaning they would not relief excess pressure in the event of an overpressure event. The cases where adhesions result in FTO or FPT appear to be confined to SOPRV with diameters < 1 in and set pressures < 150 psig and the FTO are estimated to occur in 0.31% to 2.00% of this subpopulation of SS trim SOPRV. The reliability and safety implications of these finding for end-users who do not perform pre-installation testing of SOPRV are discussed.

Gross, Robert E. [Savannah River Site (SRS), Aiken, SC (United States); Bukowski, Julia V. [Villanova University, Villanova, PA (United States); Goble, William M. [exida, Sellersville, PA (United States)

2013-04-16T23:59:59.000Z

130

Automated manual transmission clutch controller  

DOE Patents [OSTI]

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

1999-11-30T23:59:59.000Z

131

Transmission - Contact Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler TinaContact-Information-Transmission Sign In About |

132

Transmission Capacity Forum  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler TinaContact-Information-Transmission Sign In About

133

Transmission Contact Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler TinaContact-Information-Transmission Sign In

134

Transmission Developers Inc.  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for' % ~ Transmission

135

Transmission and Storage Operations  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for' %Transmission and

136

Electricity Transmission, A Primer  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatementNOTElectricity Transmission System

137

Transmission Right Of Way  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layered NbS2Topo II: AnTraining andfordefault SignTransmissionAbout

138

Transmission SEAB Presentation  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of EnergyProgram2-26 Date: March 2, 2012Department ofTransmissionOvercoming

139

Great Plains Wind Energy Transmission Development Project  

SciTech Connect (OSTI)

In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

2012-06-09T23:59:59.000Z

140

Abstract --Under a context of transmission open access, a methodology to define a common transmission trunk system  

E-Print Network [OSTI]

Terms--Transmission systems, Transmission pricing, Cooperative games, Shapley value, Transmission open

Catholic University of Chile (Universidad CatĂłlica de Chile)

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Mobile medical disaster relief technology : enhancing communication, medical logistics, data creation, and crisis mapping for vulnerable communities  

E-Print Network [OSTI]

This thesis explores the field of disaster relief and recovery, and the application of emerging technologies that are both used by, and use the data generated by communities affected by natural disaster. This thesis analyzes ...

Intrator, Kira (Kira Rachel)

2012-01-01T23:59:59.000Z

142

Sensations: a fabric of natural alcoves to provide relief from city life and stimulate the five senses  

E-Print Network [OSTI]

Cities have always been, and will likely always be, hectic. With every new technological advance this characteristic becomes amplified, and today city life offers little relief from cell phone chatter, honking car horns, ...

Brown, Megan (Megan Francesca)

2008-01-01T23:59:59.000Z

143

The 1,000 dollar home : a scalable business model to build disaster relief dwellings and upgrade slums  

E-Print Network [OSTI]

This thesis proposes a new model for the private markets to build disaster relief dwellings or to upgrade degraded neighborhoods of very low income communities. The study offers a way to empower the dwellers of very poor ...

Cańzio, Luis (Del Cańzio)

2006-01-01T23:59:59.000Z

144

Increasing transmission loadability by the application of shunt capacitors  

SciTech Connect (OSTI)

The companies located in the eastern portion of the Pennsylvania-New Jersey-Maryland Interconnection (PJM) have installed oil-fired generation to meet strict environmental requirements. In an attempt to reduce the use of oil, PJM has been purchasing energy from systems to the west of PJM where the primary fuel is coal. These west-to-east energy transfers have increased the loading on the 500kV transmission system. The heavy loadings have resulted in voltage limitations on the 500kV system that limit flows to well below the thermal capability. Results of an analysis of this problem and recommendations for removing the voltage limitations are presented. It is primarily recommended to use shunt capacitors to supply the transmission system reactive losses.

Palmer, R.

1981-05-01T23:59:59.000Z

145

Colorado Electrical Transmission Grid  

SciTech Connect (OSTI)

Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Xcel Energy Publication Date: 2012 Title: Colorado XcelEnergy NonXcel Transmission Network Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains transmission network of Colorado Spatial Domain: Extent: Top: 4540689.017558 m Left: 160606.141934 m Right: 758715.946645 m Bottom: 4098910.893397m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shapefile

Zehner, Richard E.

2012-02-01T23:59:59.000Z

146

Demand Relief and Weather Sensitivity in Large California Commercial Office Buildings  

E-Print Network [OSTI]

implemented or are under consideration. Historically, the target customers have been large industrial users who can reduce the equivalent load of several large office buildings. While the individual load reduction from an individual office building may be less...

Kinney, S.; Piette, M. A.; Gu, L.; Haves, P.

2001-01-01T23:59:59.000Z

147

Load Management Made Simple  

E-Print Network [OSTI]

Company have moved to a demand side or load management mode which seeks to influence customers to change electric usage patterns to more efficiently use available generating capacity. Since 1970, the TUEC system peak demand has more than doubled from about...

Schneider, K.

1985-01-01T23:59:59.000Z

148

Cooling load estimation methods  

SciTech Connect (OSTI)

Ongoing research on quantifying the cooling loads in residential buildings, particularly buildings with passive solar heating systems, is described. Correlations are described that permit auxiliary cooling estimates from monthly average insolation and weather data. The objective of the research is to develop a simple analysis method, useful early in design, to estimate the annual cooling energy required of a given building.

McFarland, R.D.

1984-01-01T23:59:59.000Z

149

Boost type PWM HVDC transmission system  

SciTech Connect (OSTI)

This paper reports that conventional HVdc is built around the mercury arc rectifier or the thyristor which requires line commutation. The advances of fast, high power GTO's and future devices such as MCT's with turn off capabilities, are bringing PWM techniques within the range of HVdc applications. By combining PWM techniques to the boost type bridge topology, one has an alternate system of HVdc Transmission. On the ac side, the converter station has active controls over: the voltage amplitude, the voltage angle and the frequency. On the dc side, parallel connections facilitate multi-terminal load sharing by simple local controls so that redundant communication channels are not required. Bidirectional power through each station is accomplished by the reversal of the direction of dc current flow. These claims have been substantiated by experimental results from laboratory size multi-terminal models.

Ooi, B.T.; Wang, X. (McGill Univ., Montreal, PQ (Canada). Dept. of Electrical Engineering)

1991-10-01T23:59:59.000Z

150

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION  

Broader source: Energy.gov [DOE]

The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

151

Radio-frequency and microwave load comprising a carbon-bonded carbon fiber composite  

DOE Patents [OSTI]

A billet of low-density carbon-bonded carbon fiber (CBCF) composite is machined into a desired attenuator or load element shape (usually tapering). The CBCF composite is used as a free-standing load element or, preferably, brazed to the copper, brass or aluminum components of coaxial transmission lines or microwave waveguides. A novel braze method was developed for the brazing step. The resulting attenuator and/or load devices are robust, relatively inexpensive, more easily fabricated, and have improved performance over conventional graded-coating loads. 9 figs.

Lauf, R.J.; McMillan, A.D.; Johnson, A.C.; Everleigh, C.A.; Moorhead, A.J.

1998-04-21T23:59:59.000Z

152

Radio-frequency and microwave load comprising a carbon-bonded carbon fiber composite  

DOE Patents [OSTI]

A billet of low-density carbon-bonded carbon fiber (CBCF) composite is machined into a desired attenuator or load element shape (usually tapering). The CBCF composite is used as a free-standing load element or, preferably, brazed to the copper, brass or aluminum components of coaxial transmission lines or microwave waveguides. A novel braze method was developed for the brazing step. The resulting attenuator and/or load devices are robust, relatively inexpensive, more easily fabricated, and have improved performance over conventional graded-coating loads.

Lauf, Robert J. (Oak Ridge, TN); McMillan, April D. (Knoxville, TN); Johnson, Arvid C. (Lake in the Hills, IL); Everleigh, Carl A. (Raleigh, NC); Moorhead, Arthur J. (Knoxville, TN)

1998-01-01T23:59:59.000Z

153

Direct current power transmission systems  

SciTech Connect (OSTI)

This book represents text on HVDC transmission available. It deals with the various aspects of the state of the art in HVDC transmission technology. This book presents many aspects of interactions of AC/DC systems. Modeling and analysis of DC systems are also discussed in detail.

Padiyar, K.R.

1991-01-01T23:59:59.000Z

154

HVDC power transmission technology assessment  

SciTech Connect (OSTI)

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

155

Load Management: Opportunity or Calamity?  

E-Print Network [OSTI]

larger now than prior to 1973. Utilities are examining two options which can be termed load management. One option is to control discretionary loads during peak periods. Cycling of residential water heaters or shutting off industrial electric furnaces...

Males, R.; Hassig, N.

1981-01-01T23:59:59.000Z

156

Key-shift transmission  

SciTech Connect (OSTI)

A key-shift transmission is described, characterized by the speed-change shaft being divided into a pair of trough-shaped shaft halves each having an arched inner surface which defines a part of a cylindrical bore extending axially through the speed-change shaft thereby the shaft being formed into a hollow shaft, and by each of the shaft halves including a pair of flattened end surfaces which extend axially of each shaft half at both sides of the inner surface, one of the end surfaces having thereon an axially elongated projection and the other of the end surfaces having herein an axially elongated recess of a depth smaller than the height of the projection. The pair of shaft halves are engaged to each other co-rotatably by fitting the projections of the respective shaft halves into the recesses of the respective shaft halves so as to form in an outer surface of the speed-change shaft a pair of elongated axial grooves which are located radially outwardly of the elongated projections of the respective shaft halves and between the flattened end surfaces of the respective shaft halves. A pair of the shift keys are disposed within the pair of elongated axial grooves.

Nemoto, S.

1989-03-07T23:59:59.000Z

157

Control system and method for a power delivery system having a continuously variable ratio transmission  

DOE Patents [OSTI]

A control system and method for a power delivery system, such as in an automotive vehicle, having an engine coupled to a continuously variable ratio transmission (CVT). Totally independent control of engine and transmission enable the engine to precisely follow a desired operating characteristic, such as the ideal operating line for minimum fuel consumption. CVT ratio is controlled as a function of commanded power or torque and measured load, while engine fuel requirements (e.g., throttle position) are strictly a function of measured engine speed. Fuel requirements are therefore precisely adjusted in accordance with the ideal characteristic for any load placed on the engine.

Frank, Andrew A. (1034 Hillside Ave., Madison, WI 53705)

1984-01-01T23:59:59.000Z

158

Control system and method for a power delivery system having a continuously variable ratio transmission  

DOE Patents [OSTI]

A control system and method for a power delivery system, such as in an automotive vehicle, having an engine coupled to a continuously variable ratio transmission (CVT). Totally independent control of engine and transmission enable the engine to precisely follow a desired operating characteristic, such as the ideal operating line for minimum fuel consumption. CVT ratio is controlled as a function of commanded power or torque and measured load, while engine fuel requirements (e.g., throttle position) are strictly a function of measured engine speed. Fuel requirements are therefore precisely adjusted in accordance with the ideal characteristic for any load placed on the engine. 4 figs.

Frank, A.A.

1984-07-10T23:59:59.000Z

159

Regional Transmission Projects: Finding Solutions  

SciTech Connect (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

160

NWCC Transmission Case Study III  

SciTech Connect (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Energy Transmission and Infrastructure  

SciTech Connect (OSTI)

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

162

Pressure Relief Devices for High-Pressure Gaseous Storage Systems: Applicability to Hydrogen Technology  

SciTech Connect (OSTI)

Pressure relief devices (PRDs) are viewed as essential safety measures for high-pressure gas storage and distribution systems. These devices are used to prevent the over-pressurization of gas storage vessels and distribution equipment, except in the application of certain toxic gases. PRDs play a critical role in the implementation of most high-pressure gas storage systems and anyone working with these devices should understand their function so they can be designed, installed, and maintained properly to prevent any potentially dangerous or fatal incidents. As such, the intention of this report is to introduce the reader to the function of the common types of PRDs currently used in industry. Since high-pressure hydrogen gas storage systems are being developed to support the growing hydrogen energy infrastructure, several recent failure incidents, specifically involving hydrogen, will be examined to demonstrate the results and possible mechanisms of a device failure. The applicable codes and standards, developed to minimize the risk of failure for PRDs, will also be reviewed. Finally, because PRDs are a critical component for the development of a successful hydrogen energy infrastructure, important considerations for pressure relief devices applied in a hydrogen gas environment will be explored.

Kostival, A.; Rivkin, C.; Buttner, W.; Burgess, R.

2013-11-01T23:59:59.000Z

163

Bibliography on transmission access issues  

SciTech Connect (OSTI)

This paper presents a bibliography on issues related to transmission access in electric power systems. There are 233 citations referenced in this bibliography. This bibliography presents a collection of selected literature on issues related to transmission access. It does not contain all of the material available on this subject or the categories contained herein. Some readers may feel that citations within this bibliography should be strictly limited to transmission system issues and not include energy pricing or reliability issues. However, it was the decision of the Subcommittee of the IEEE Task Force on Transmission Access and Nonutility Generation that selected entries relating to reliability and energy pricing, most relevant to transmission access, should be included. This decision was made because certain issues relating to reliability, transmission and energy pricing are perceived by the industry to be critical in the discussion of transmission access. The bibliography has been divided into the following sections or sub-sections: 2.0 Operational (Engineering) Issues, 3.0 Planning, 4.0 Reliability, 5.1 Economics: Costing, 5.2(a) Economics: Location-Differentiated Pricing, 5.2(b) Economics: Time-Differentiated Pricing, 5.3 Economics: Brokering, Bidding, and Auctioning, 6.0 Regulatory, and 7.0 General. Although the content of many publications spanned two or more of these sections, the desire to limit document length required that all publications be placed in the single most appropriate section. Publications are sorted according to author or publication resource.

Lankford, C.B. [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States)] [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States); McCalley, J.D. [Iowa State Univ., Ames, IA (United States)] [Iowa State Univ., Ames, IA (United States); Saini, N.K. [Entergy Services Corp., Metairie, LA (United States)] [Entergy Services Corp., Metairie, LA (United States)

1996-02-01T23:59:59.000Z

164

AC and DC power transmission  

SciTech Connect (OSTI)

The technical and economic assessment of AC and DC transmission systems; long distance transmission, cable transmission, system inter-connection, voltage support, reactive compensation, stabilisation of systems; parallel operation of DC links with AC systems; comparison between alternatives for particular schemes. Design and application equipment: design, testing and application of equipment for HVDC, series and shunt static compensated AC schemes, including associated controls. Installations: overall design of stations and conductor arrangements for HVDC, series and shunt static AC schemes including insulation co-ordination. System analysis and modelling.

Not Available

1985-01-01T23:59:59.000Z

165

Electrical transmission line diametrical retainer  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

166

Midwest Transmission Workshop I Summary  

SciTech Connect (OSTI)

OAK-B135 The meeting was opened with a review of the purposes of the workshop: (1) Present and discuss key studies and assessments of transmission upgrades, additions and related issues for the upper Midwest, including work that addresses the full range of views on these topics; (2) Understand the various transmission issues in the upper Midwest and discuss options for addressing the issues; and (3) Identify the decision makers and entities that need to play an active role if transmission issues are to be resolved, and agree on next steps for engaging these individuals and organizations through education, outreach, and information dissemination.

Kevin Bryan

2001-05-01T23:59:59.000Z

167

Omega Transmission Lines with Applications to Effective Medium Models of Metamaterials  

E-Print Network [OSTI]

In this paper we introduce the concept of transmission lines with inherent bi-anisotropy and establish an analogy between these lines and volumetric bi-anisotropic materials. In particular, we find under what conditions a periodically loaded transmission line can be treated as an effective omega medium. Two example circuits are introduced and analyzed. The results have two-fold implications: opening a route to emulate electromagnetic properties of bi-anisotropic omega media using transmission-line meshes and understanding and improving effective medium models of composite materials with the use of effective circuit models of unit cells.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

168

Video transmission over wireless networks  

E-Print Network [OSTI]

Compressed video bitstream transmissions over wireless networks are addressed in this work. We first consider error control and power allocation for transmitting wireless video over CDMA networks in conjunction with multiuser detection. We map a...

Zhao, Shengjie

2005-08-29T23:59:59.000Z

169

EIS-0231: Navajo Transmission Project  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned...

170

WINDExchange Offshore Wind Webinar: Transmission Planning and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind WINDExchange Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind...

171

2006 National Electric Transmission Congestion Study Federal...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

172

National Electric Transmission Congestion Study | Department...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Study National Electric Transmission Congestion Study National Electric Transmission Congestion Study Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C....

173

2009 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

174

2006 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

175

National Electric Transmission Congestion Study Workshops | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study Workshops National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops to receive input...

176

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

177

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2013 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

178

Natural Gas Transmission and Distribution Module This  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2012 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

179

DEPARTMENT OF ENERGY National Electric Transmission Congestion...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Report Docket No. 2007-OE-01, Mid-Atlantic Area National Interest Electric Transmission Corridor; Docket No. 2007-0E-02, Southwest Area...

180

Directly correlated transmission electron microscopy and atom...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directly correlated transmission electron microscopy and atom probe tomography of grain boundary oxidation in a Ni-Al binary Directly correlated transmission electron microscopy...

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Online Load Balancing for Related Machines  

E-Print Network [OSTI]

of entire schedule s as follows: load(s; i) = 1 v i X s(j)=i p j ; Load(s) = max i load(s; i) It is easyOn­line Load Balancing for Related Machines Piotr Berman \\Lambda Moses Charikar y Marek Karpinski z­line load balancing was studied extensively over the years (cf., e.g., [7], [3], [4], and [2

Karpinski, Marek

182

Deepwater royalty relief product of 3 1/2 year U.S. political effort  

SciTech Connect (OSTI)

Against the backdrop of more than 20 years of increasingly stringent environmental regulation, ever-expanding exploration and development moratoria on the Outer Continental Shelf (OCS), and reductions in producer tax incentives, oil and natural gas exploration companies active in deep waters of the Gulf of Mexico recently won a significant legislative victory. On Nov. 28, 1995, President Clinton signed into law S.395, the Alaska Power Administration Sale Act. Title 3 of S.395 embodies the Outer Continental Shelf Deep Water Royalty Relief Act. This landmark legislation provides substantial incentives for oil and natural gas production in the gulf of Mexico by temporarily eliminating royalties on certain deepwater leases. It is the first direct incentive for oil and gas production enacted at the federal level in many years. This paper reviews the elements used to arrive at this successful legislation including the congressional leadership. It describes debates, cabinet level discussions, and use of parlimentary procedures.

Davis, R.E. [Stuntz and Davis, Washington, DC (United States); Neff, S. [Senate Energy and Natural Resources Committee, Washington, DC (United States)

1996-04-01T23:59:59.000Z

183

THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES  

SciTech Connect (OSTI)

The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accounted for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.

Harris, S.; Gross, R.

2014-04-01T23:59:59.000Z

184

Dynamic load balancing of applications  

DOE Patents [OSTI]

An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated.

Wheat, Stephen R. (Albuquerque, NM)

1997-01-01T23:59:59.000Z

185

Demand Response: Load Management Programs  

E-Print Network [OSTI]

CenterPoint Load Management Programs CATEE Conference October, 2012 Agenda Outline I. General Demand Response Definition II. General Demand Response Program Rules III. CenterPoint Commercial Program IV. CenterPoint Residential Programs... V. Residential Discussion Points Demand Response Definition of load management per energy efficiency rule 25.181: ? Load control activities that result in a reduction in peak demand, or a shifting of energy usage from a peak to an off...

Simon, J.

2012-01-01T23:59:59.000Z

186

Dynamic load balancing of applications  

DOE Patents [OSTI]

An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers is disclosed. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated. 13 figs.

Wheat, S.R.

1997-05-13T23:59:59.000Z

187

High-Power Rf Load  

DOE Patents [OSTI]

A compact high-power RF load comprises a series of very low Q resonators, or chokes [16], in a circular waveguide [10]. The sequence of chokes absorb the RF power gradually in a short distance while keeping the bandwidth relatively wide. A polarizer [12] at the input end of the load is provided to convert incoming TE.sub.10 mode signals to circularly polarized TE.sub.11 mode signals. Because the load operates in the circularly polarized mode, the energy is uniformly and efficiently absorbed and the load is more compact than a rectangular load. Using these techniques, a load having a bandwidth of 500 MHz can be produced with an average power dissipation level of 1.5 kW at X-band, and a peak power dissipation of 100 MW. The load can be made from common lossy materials, such as stainless steel, and is less than 15 cm in length. These techniques can also produce loads for use as an alternative to ordinary waveguide loads in small and medium RF accelerators, in radar systems, and in other microwave applications. The design is easily scalable to other RF frequencies and adaptable to the use of other lossy materials.

Tantawi, Sami G. (San Mateo, CA); Vlieks, Arnold E. (Livermore, CA)

1998-09-01T23:59:59.000Z

188

Alternative Economic Criteria and Proactive Planning for Transmission Investment in Deregulated Power Systems  

E-Print Network [OSTI]

Alternative Economic Criteria and Proactive Planning for Transmission Investment in Deregulated as the economic objective of connecting load areas to remote cheap generation resources. This was done within for pricing and return on investments have increased the burden of economic justification for investment

Oren, Shmuel S.

189

The Centre for Power Transmission  

E-Print Network [OSTI]

circuit in which linear actuators act as pump, and a hydraulic motor drives an electric generator buoy and waves, and load characteristics of generators connected to an electrical grid must

Burton, Geoffrey R.

190

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 17, NO. 1, FEBRUARY 2002 159 Economic Congestion Relief Across Multiple  

E-Print Network [OSTI]

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 17, NO. 1, FEBRUARY 2002 159 Economic Congestion Relief, and Andrew M. Ross Abstract--This paper is concerned with market-based protocols for relieving congestion caused by transactions outside the control area in which the congestion occurred. One approach, proposed

191

Geographia Technica, Special Issue, 2010, pp. 90 to 95 AUTOMATED SMALL-SCALE RELIEF SHADING: A NEW METHOD  

E-Print Network [OSTI]

for the generalization of digital elevation models specifically designed to process digital elevation data visible at small scales. Small- scale shaded relief derived automatically from high-resolution digital are applied to digital terrain data, important ridges and valley edges are blurred, and their characteristic

Jenny, Bernhard

192

Where Did All the Money Go? Congress approved the Troubled Asset Relief Program (TARP) to jump start the credit  

E-Print Network [OSTI]

Where Did All the Money Go? Congress approved the Troubled Asset Relief Program (TARP) to jump forward that unfortunately remains vague. Inexplicably, the TARP II money did not come with a mandate to use the money to increase lending. Now, covenants come with the distribution of the remaining TARP

Ahmad, Sajjad

193

Identification and definition of unbundled electric generation and transmission services  

SciTech Connect (OSTI)

State and federal regulators, private and public utilities, large and small customers, power brokers and marketers, and others are engaged in major debates about the future structure of the electric industry. Although the outcomes are far from certain, it seems clear that customers will have much greater choices about the electric services they purchase and from whom they buy these services. This report examines the ``ancillary`` services that are today buried within the typical vertically integrated utility. These ancillary services support and make possible the provision of the basic services of generating capacity, energy supply, and power delivery. These ancillary services include: Management of generating units; reserve generating capacity to follow variations in customer loads, to provide capacity and energy when generating units or transmission lines suddenly fall, to maintain electric-system stability, and to provide local-area security; transmission-system monitoring and control; replacement of real power and energy losses; reactive-power management and voltage regulation; transmission reserves; repair and maintenance of the transmission network; metering, billing, and communications; and assurance of appropriate levels of power quality. Our focus in this report, the first output from a larger Oak Ridge National Laboratory project, is on identification and definition of these services. Later work in this project will examine more closely the costs and pricing options for each service.

Kirby, B.; Hirst, E.; Vancoevering, J.

1995-03-01T23:59:59.000Z

194

Transmission needs across a fully renewable European power system  

E-Print Network [OSTI]

The residual load and excess power generation of 27 European countries with a 100% penetration of variable renewable energy sources are explored in order to quantify the benefit of power transmission between countries. Estimates are based on extensive weather data, which allows for modelling of hourly mismatches between the demand and renewable generation from wind and solar photovoltaics. For separated countries, balancing is required to cover around 24% of the total annual energy consumption. This number can be reduced down to 15% once all countries are networked together with uncon- strained interconnectors. The reduction represents the maximum possible benefit of transmission for the countries. The total Net Transfer Capacity of the unconstrained interconnectors is roughly twelve times larger than current values. However, constrained interconnector capacities six times larger than the current values are found to provide 97% of the maximum possible benefit of cooperation. This motivates a detailed investig...

Rodriguez, Rolando A; Andresen, Gorm B; Heide, Dominik; Greiner, Martin

2013-01-01T23:59:59.000Z

195

July 2, 2007 1 Optimal Transmission Switching  

E-Print Network [OSTI]

d to node n. zk: binary variable indicating whether transmission line k is removed from the system limit on number of open transmission lines Manuscript received July 2, 2007. This work was supported-mail: ferris@cs.wisc.edu). Sets : Set of all transmission lines L: Set of open transmission lines in solution

Mangasarian, Olvi L.

196

ELECTRICITY TRANSMISSION IN DEREGULATED MARKETS; CONFERENCE AT CARNEGIE MELLON UNIVERSITY, PITTSBURGH PA USA DECEMBER 2004 1 A criticality approach to monitoring cascading  

E-Print Network [OSTI]

ELECTRICITY TRANSMISSION IN DEREGULATED MARKETS; CONFERENCE AT CARNEGIE MELLON UNIVERSITY, PITTSBURGH PA USA DECEMBER 2004 1 A criticality approach to monitoring cascading failure risk and failure the risk of cascading failure of electric power transmission systems as overall loading is increased

Dobson, Ian

197

Midwest Transmission Workshop III Summary  

SciTech Connect (OSTI)

OAK-B135 On March 12-13, 2002, the National Wind Coordinating Committee (NWCC), in cooperation with regional stakeholders, held a two-day workshop: Planning for Electrical Transmission Needs in the Upper Midwest. The workshop was the outgrowth of an effort to develop a forum and process for consideration of transmission options that strives for equitable allocation of benefits and impacts among all affected parties. The goal of this workshop was to provide a catalyst for an enhanced, inclusive process for transmission planning with participation of and acceptance by all affected stakeholders. Participants in the meeting included representatives of state and regional regulatory agencies, utilities and power generators, the wind industry, environmental and landowner interests, and other interested parties (see Attachment A for a list of meeting participants).

Kevin Bryan

2003-03-12T23:59:59.000Z

198

Spring loaded locator pin assembly  

DOE Patents [OSTI]

This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece.

Groll, Todd A. (Idaho Falls, ID); White, James P. (Pocatelo, ID)

1998-01-01T23:59:59.000Z

199

Spring loaded locator pin assembly  

DOE Patents [OSTI]

This invention deals with spring loaded locator pins. Locator pins are sometimes referred to as captured pins. This is a mechanism which locks two items together with the pin that is spring loaded so that it drops into a locator hole on the work piece. 5 figs.

Groll, T.A.; White, J.P.

1998-03-03T23:59:59.000Z

200

Load Forecasting of Supermarket Refrigeration  

E-Print Network [OSTI]

energy system. Observed refrigeration load and local ambient temperature from a Danish su- permarket renewable energy, is increasing, therefore a flexible energy system is needed. In the present ThesisLoad Forecasting of Supermarket Refrigeration Lisa Buth Rasmussen Kongens Lyngby 2013 M.Sc.-2013

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Wind load reduction for heliostats  

SciTech Connect (OSTI)

This report presents the results of wind-tunnel tests supported through the Solar Energy Research Institute (SERI) by the Office of Solar Thermal Technology of the US Department of Energy as part of the SERI research effort on innovative concentrators. As gravity loads on drive mechanisms are reduced through stretched-membrane technology, the wind-load contribution of the required drive capacity increases in percentage. Reduction of wind loads can provide economy in support structure and heliostat drive. Wind-tunnel tests have been directed at finding methods to reduce wind loads on heliostats. The tests investigated primarily the mean forces, moments, and the possibility of measuring fluctuating forces in anticipation of reducing those forces. A significant increase in ability to predict heliostat wind loads and their reduction within a heliostat field was achieved.

Peterka, J.A.; Hosoya, N.; Bienkiewicz, B.; Cermak, J.E.

1986-05-01T23:59:59.000Z

202

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

transmission right, electricity auction, simultaneous feasibility, transmission pricing. I. INTRODUCTION POINT

203

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

, transmission pricing. I. INTRODUCTION POINT-TO-POINT financial transmission rights (FTRs) (see [2] and [7

204

WILEY WIRELESS COMMUNICATIONS AND MOBILE COMPUTING 1 DSP Implementation of a Bit Loading  

E-Print Network [OSTI]

Wireless Communications and Networking Conference (WCNC), Las Vegas, Nevada, USA. This work was generously loading, DSP implementation. I. INTRODUCTION Deployed in a wide range of high data rate transmission applications, e.g., digital subscriber line (DSL) modems [1] and wireless local area network (WLAN) systems [2

Kansas, University of

205

Power superconducting power transmission cable  

DOE Patents [OSTI]

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

206

Power Transmission, Distribution and Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Transmission, Distribution and Plants A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Abdel-Aal, Radwan E. - Computer Engineering Department, King Fahd University of...

207

Fluoroscopically Guided Feeding Tube Insertion for Relief of Postoperative Gastrointestinal Anastomotic Obstruction and Leakage  

SciTech Connect (OSTI)

Purpose. To evaluate the feasibility and effectiveness of feeding tube insertion and enteral feeding for the treatment of postoperative gastrointestinal anastomotic obstruction and leakage. Materials and Methods. From June 1999 to June 2002, thirty-four cases of postoperative gastrointestinal anastomotic obstruction and leakage after surgery for gastric carcinoma were treated by insertion of a feeding tube under fluoroscopic guidance. Twenty-one patients were male and 13 were female. The patients' ages ranged from 39 to 74 years (mean age: 61 years). All the patients experienced vomiting, and 15 patients had anastomotic site or duodenal stump leakage. We evaluated the feasibility of feeding tube insertion for enteral feeding to improve the obstruction and facilitate leakage site closure, and the patients' nutritional benefit was also evaluated by checking the serum albumin level between pre- and post-enteral feeding via the feeding tube.Results. Thirty-two patients (94%) were successfully managed by feeding tube insertion, but the remaining two were not managed, and this was due to severe angulations at the anastomotic site. The procedure times for feeding tube insertion ranged from 15 to 60 minutes (mean time: 45 minutes). Twenty-eight patients experienced symptomatic relief of gastrointestinal obstruction, and they were able to resume a normal regular diet after feeding tube removal. Three patients underwent stent insertion due to recurrent symptoms, and one patient underwent jejunostomy feeding due to the presence of a persistent leakage site. Eleven patients achieved leakage site closure after enteral feeding via a feeding tube. The serum albumin level was significant, increased from pre-enteral feeding (2.65 {+-} 0.37 g/dL) to the post-enteral feeding (3.64 {+-} 0.58 g/dL) via the feeding tube (p < 0.001). The duration of follow-up ranged from one to 53 months (mean: 23 months). Conclusion. The insertion of a feeding tube for enteral feeding under fluoroscopic guidance is safe, and it provides effective relief from gastrointestinal anastomotic site obstruction and leakage after gastric surgery. Moreover, our findings indicate that feeding tube insertion for enteral feeding may be used as the primary procedure to treat postoperative anastomotic obstruction and leakage.

Han, Young-Min [Chonbuk National University Medical School and Hospital, Department of Radiology (Korea, Republic of)], E-mail: ymhan@chonbuk.ac.kr; Kim, Chan-Young; Yang, Doo-Hyun [Chonbuk National University Medical School and Hospital, Department of Surgery (Korea, Republic of); Kwak, Hyo-Sung; Jin, Gong-Yong [Chonbuk National University Medical School and Hospital, Department of Radiology (Korea, Republic of)

2006-06-15T23:59:59.000Z

208

Electrical and Production Load Factors  

E-Print Network [OSTI]

, Texas Abstract Load factors and operating hours of small and medium-sized industrial plants are analyzed to classify shift-work patterns and develop energy conservation diagnostic tools. This paper discusses two types of electric load factors... for each shift classification within major industry groups. The load factor based on billing hours (ELF) increases with operating hours from about 0.4 for a nominal one shift operation, to about 0.7 for around-the-clock operation. On the other hand...

Sen, T.; Heffington, W. M.

209

RAPID/BulkTransmission/Transmission Siting & Interconnection | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: EnergyPotentialUrbanUtilityScalePVCapacityPulaskiRAPID/BulkTransmission/Texas < RAPID‎ |

210

Environmental Assessment of Urgent-Relief Acceptance of Foreign Research Reactor Spent Nuclear Fuel  

SciTech Connect (OSTI)

The Department of Energy has completed the Environmental Assessment (EA) of Urgent-Relief Acceptance of Foreign Research Reactor Spent Nuclear Fuel and issued a Finding of No Significant Impact (FONSI) for the proposed action. The EA and FONSI are enclosed for your information. The Department has decided to accept a limited number of spent nuclear fuel elements (409 elements) containing uranium that was enriched in the United States from eight research reactors in Austria, Denmark, Germany, Greece, the Netherlands, Sweden, and Switzerland. This action is necessary to maintain the viability of a major US nuclear weapons nonproliferation program to limit or eliminate the use of highly enriched uranium in civil programs. The purpose of the EA is to maintain the cooperation of the foreign research reactor operators with the nonproliferation program while a more extensive Environmental Impact Statement (EIS) is prepared on a proposed broader policy involving the acceptance of up to 15,000 foreign research reactor spent fuel elements over a 10 to 15 year period. Based on an evaluation of transport by commercial container liner or chartered vessel, five eastern seaboard ports, and truck and train modes of transporting the spent fuel overland to the Savannah River Sits, the Department has concluded that no significant impact would result from any combination of port and made of transport. In addition, no significant impacts were found from interim storage of spent fuel at the Savannah River Site.

Not Available

1994-04-01T23:59:59.000Z

211

Sandia Wind Turbine Loads Database  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The Sandia Wind Turbine Loads Database is divided into six files, each corresponding to approximately 16 years of simulation. The files are text files with data in columnar format. The 424MB zipped file containing six data files can be downloaded by the public. The files simulate 10-minute maximum loads for the NREL 5MW wind turbine. The details of the loads simulations can be found in the paper: “Decades of Wind Turbine Loads Simulations”, M. Barone, J. Paquette, B. Resor, and L. Manuel, AIAA2012-1288 (3.69MB PDF). Note that the site-average wind speed is 10 m/s (class I-B), not the 8.5 m/s reported in the paper.

212

Building load control and optimization  

E-Print Network [OSTI]

Researchers and practitioners have proposed a variety of solutions to reduce electricity consumption and curtail peak demand. This research focuses on load control by improving the operations in existing building HVAC ...

Xing, Hai-Yun Helen, 1976-

2004-01-01T23:59:59.000Z

213

Lumped transmission line avalanche pulser  

DOE Patents [OSTI]

A lumped linear avalanche transistor pulse generator utilizes stacked transistors in parallel within a stage and couples a plurality of said stages, in series with increasing zener diode limited voltages per stage and decreasing balanced capacitance load per stage to yield a high voltage, high and constant current, very short pulse. 8 figs.

Booth, R.

1995-07-18T23:59:59.000Z

214

Lumped transmission line avalanche pulser  

DOE Patents [OSTI]

A lumped linear avalanche transistor pulse generator utilizes stacked transistors in parallel within a stage and couples a plurality of said stages, in series with increasing zener diode limited voltages per stage and decreasing balanced capacitance load per stage to yield a high voltage, high and constant current, very short pulse.

Booth, Rex (Livermore, CA)

1995-01-01T23:59:59.000Z

215

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

2007. “Inclusion of Wind in the MISO Transmission Expansionhttp://www.jcspstudy.org/ Midwest ISO (MISO). 2007. Midwest+Planning Midwest ISO (MISO). 2003. Midwest Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

216

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

SciTech Connect (OSTI)

The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this paper we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33percent of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33percent RE target across nearly all scenarios analyzed (38-65percent). Solar energy is almost always the second largest source (14-41percent). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Further, we find that even with total transmission expenditures of $17-34 billion these costs still represent just 10-19percent of the total delivered cost of renewable energy.

Mills, Andrew D.; Phadke, Amol A.; Wiser, Ryan H.

2010-06-10T23:59:59.000Z

217

Transmission  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler Tina ButlerTodayTransForumEnergyTransit

218

Midwest Transmission Workshop II Summary  

SciTech Connect (OSTI)

OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

Kevin Bryan

2002-12-05T23:59:59.000Z

219

Florida Electric Transmission Line Siting Act (Florida)  

Broader source: Energy.gov [DOE]

The Transmission Line Siting Act (TLSA) is the state’s centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15...

220

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Cooling load design tool for UFAD systems.  

E-Print Network [OSTI]

Underfloor Air Distribution (UFAD) Design Guide. Atlanta:Load Design Tool for Underfloor Air Distribution Systems. ”for design cooling loads in underfloor air distribution (

Bauman, Fred; Schiavon, Stefano; Webster, Tom; Lee, Kwang Ho

2010-01-01T23:59:59.000Z

222

Self-aligning biaxial load frame  

DOE Patents [OSTI]

An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed crosshead, and by alignment and linear motion elements of one load assembly relative to the load frame.

Ward, Michael B. (Idaho Falls, ID); Epstein, Jonathan S. (Idaho Falls, ID); Lloyd, W. Randolph (Idaho Falls, ID)

1994-01-01T23:59:59.000Z

223

Self-aligning biaxial load frame  

DOE Patents [OSTI]

An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed cross head, and by alignment and linear motion elements of one load assembly relative to the load frame. 3 figures.

Ward, M.B.; Epstein, J.S.; Lloyd, W.R.

1994-01-18T23:59:59.000Z

224

Articles about Grid Integration and Transmission  

Broader source: Energy.gov [DOE]

Stories about grid integration and transmission featured by the U.S. Department of Energy (DOE) Wind Program.

225

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

SciTech Connect (OSTI)

Building transmission to reach renewable energy (RE) goals requires coordination among renewable developers, utilities and transmission owners, resource and transmission planners, state and federal regulators, and environmental organizations. The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this report we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33% of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Of the renewable resources in WREZ resource hubs, and under the assumptions described in this report, our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33% RE target across nearly all scenarios analyzed (38-65%). Solar energy is almost always the second largest source (14-41%). Solar exceeds wind by a small margin only when solar thermal energy is assumed to experience cost reductions relative to all other technologies. Biomass, geothermal, and hydropower are found to represent a smaller portion of the selected resources, largely due to the limited resource quantity of these resources identified within the WREZ-identified hubs (16-23% combined). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Uncertainties and policies that impact bus-bar costs are the most important to evaluate carefully, but factors that impact transmission costs and the relative market value of each renewable option can also be important. Under scenarios in which each load zone must meet 33% of its load with delivered renewable energy from the WREZ-identified resource hubs, the total transmission investment required to meet the 33% west-wide RE target is estimated at between $22 billion and $34 billion. Although a few of the new transmission lines are very long - over 800 miles - most are relatively short, with average transmission distances ranging from 230-315 miles, depending on the scenario. Needed transmission expenditure are found to decline to $17 billion if wide use of renewable energy credits is allowed; consideration of renewable resources outside of WREZ-identified hubs would further reduce this transmission cost estimate. Even with total transmission expenditures of $17-34 billion, however, these costs still represent just 10-19% of the total delivered cost of renewable energy.

Mills, Andrew; Phadke, Amol; Wiser, Ryan

2010-02-16T23:59:59.000Z

226

Transmission Dr. Sandra Cruz-Pol  

E-Print Network [OSTI]

Transmission Lines Dr. Sandra Cruz-Pol ECE Dept. UPRM Exercise 11.3 n A 40-m long TL has Vg=15 Vrms to electric circuits! cmc kmc GHz Hz 15000,000,2000/ 000,560/ 2 60 == == Transmission Lines I. TL parameters-wave transformer ¨ Slotted line ¨ Single stub VI. Microstrips Transmission Lines (TL) n TL have two conductors

Cruz-Pol, Sandra L.

227

Influence of loading rate on axially loaded piles in clay  

E-Print Network [OSTI]

. Coyle (Member) ave u ofs (Member) . Hsrsc (Head of Department) May 1984 ABSTRACT Influence of Loading Rate on Axially Loaded Piles in Clay. (May 1984) Enrique Eduardo Garland Ponce, B. S. , Texas A8M University Chairman of Committee: Dr. Jean... and support during all phases of this study. The author also wishes to acknowledge Drs. Harry M. Coyle and David Dubofski who served as members of the advisory committee. Special notes of gratitude to Dr . Wayne A. Dunlap for his aid in the design...

Garland Ponce, Enrique Eduardo

1984-01-01T23:59:59.000Z

228

{Control of Residential Load Management Networks Using Real Time Pricing  

E-Print Network [OSTI]

loads to deliver load following and regulation, withproducts like load following and spinning reserve.following of constant power references. Chapter 7 Implications of Load

Burke, William Jerome

2010-01-01T23:59:59.000Z

229

Site-specific EIS ordered but injunctive relief deined in nuclear waste storage case  

SciTech Connect (OSTI)

The Energy Research and Development Administration (ERDA) received appropriations in 1976-77 to construct 22 tanks for storage of high level radioactive wastes generated by its nuclear weapons materials production program. The tanks were to replace older, leaking tanks at the Hanford Reservation in Richland, Washington and the Savannah River Plant in Aiken, South Carolina. The Natural Resources Defense Council (NRDC) had unsuccessfully requested that ERDA obtain a construction permit from the Nuclear Regulatory Commission (NRC). NRDC also petitioned NRC to exercise its licensing authority over the tanks under Section 202(4) of the Energy Reorganization Act of 1974. In response to the NRDC request, ERDA claimed the tanks were only for short-term storage and therefore a license was unnecessary. NRC claimed it lacked jurisdiction over the tanks. NRDC filed suit in United States District Court for the District of Columbia, alleging that ERDA had violated Section 102(2)(C) of the National Environmental Policy Act, and that both ERDA and NRC had violated Section 202(4) of the Energy Reorganization Act. NRDC requested an injunction against further construction of the tanks. Although ERDA did not have to obtain an NRC construction permit for the nuclear waste storage tanks at Hanford Reservation and Savannah River Plant, the programmatic Environmental Impact Statement submitted was insufficient and site-specific statements must be prepared. Injunctive relief pending the statements was denied for the social and economic costs of delaying the tanks project. NRC decisions even remotely connected to its licensing power should be contested in federal courts of appeals, not district courts. The court gave NRDC a hollow victory by ordering a more specific EIS, but denying an injunction.

Barnhart y Chavez, S.

1980-01-01T23:59:59.000Z

230

Comments of New England Electric Transmission Corporation on...  

Broader source: Energy.gov (indexed) [DOE]

out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and...

231

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian...  

Energy Savers [EERE]

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands...

232

Fact #850: December 8, 2014 Automatic Transmissions have closed...  

Broader source: Energy.gov (indexed) [DOE]

Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed...

233

Transmission Reliability "Load as a Resource" Peer Review Materials Now  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for' % ~Available |

234

Automated manual transmission shift sequence controller  

DOE Patents [OSTI]

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Richard G. (Royal Oak, MI); Rausen, David J. (Denver, CO)

2000-02-01T23:59:59.000Z

235

Automated manual transmission mode selection controller  

DOE Patents [OSTI]

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI)

1999-11-09T23:59:59.000Z

236

MODELING AND CONTROL OF THERMOSTATICALLY CONTROLLED LOADS  

E-Print Network [OSTI]

controlled loads (TCLs) has demonstrated that such load following is feasible, but analyt- ical models) is well matched to the role of load following. Re- search into the behavior of TCLs began with the work was then employed in a minimum variance control law to demonstrate the load following capability of a population

Hiskens, Ian A.

237

Flow Duration Curve Load Duration Curve  

E-Print Network [OSTI]

#12;Flow Duration Curve Load Duration Curve #12;1. Develop Flow Duration Curve 2. Estimate load given flow and concentration data--select appropriate conversion factors 3. Develop Load Duration Curve 4. Plot observed data with Load Duration Curve #12;What are they? How do you make one? #12;Describes

238

Flow Duration Curve Load Duration Curve  

E-Print Network [OSTI]

Flow Duration Curve Load Duration Curve 1. Develop Flow Duration Curve 2. Estimate load given flow and concentration data--select appropriate conversion factors 3. Develop Load Duration Curve 4. Plot observed data with Load Duration Curve What are they? How do you make one? Describes the percent of time a flow rate

239

Loaded transducer for downhole drilling components  

DOE Patents [OSTI]

A robust transmission element for transmitting information between downhole tools, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The transmission element maintains reliable connectivity between transmission elements, thereby providing an uninterrupted flow of information between drill string components. A transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe. To close gaps present between transmission elements, transmission elements may be biased with a "spring force, urging them closer together."

Hall, David R.; Hall Jr., H. Tracy; Pixton, David S.; Briscoe, Michael A.; Dahlgren, Scott Steven; Fox, Joe; Sneddon, Cameron

2006-02-21T23:59:59.000Z

240

Loaded Transducer Fpr Downhole Drilling Component  

DOE Patents [OSTI]

A robust transmission element for transmitting information between downhole tools, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The transmission element maintains reliable connectivity between transmission elements, thereby providing an uninterrupted flow of information between drill string components. A transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe. To close gaps present between transmission elements, transmission elements may be biased with a "spring force," urging them closer together.

Hall, David R. (Provo, UT); Hall, H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2005-07-05T23:59:59.000Z

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Analysis of Flow in Pilot Operated Safety and Relief Valve of Nuclear Reactor Coolant System  

SciTech Connect (OSTI)

When the POSRV equipped in a nuclear power plant opens in instant by a failure in coolant system of PWR, a moving shock wave generates, and propagates downstream of the valve, inducing a complicated unsteadiness. The moving shock wave may exert severe load to the structure. In this connection, a method of gradual opening of the valve is used to reduce the load acting on the wall at the downstream of the POSRV. In the present study, experiments and calculations are performed to investigate the detail unsteady flow at the various pipe units and the effect of valve opening time on the flow downstream of the valve. In calculation by using of air as working fluid, 2-dimensional, unsteady compressible Navier-Stokes equations are solved by finite volume method. It was found that when the incident shock wave passes through the pipe unit, it may experience diffraction, reflection and interaction with a vortex. Furthermore, the geometry of the pipe unit affects the reflection type of shock wave and changes the load acting on the wall of pipe unit. It was also turned out that the maximum force acting on the wall of the pipe unit becomes in order of T-junction, 108 deg. elbow and branch in magnitude, respectively. And, the results obtained that show that the rapid pressure rise due to the moving shock wave by instant POSRV valve opening is attenuated by employing the gradual opening. (authors)

Kwon, Soon-Bum; Lee, Dong-Won [Department of Mechanical Engineering, Kyungpook National University, 1370, Sankyuk-dong, Daegu 702-701 (Korea, Republic of); Kim, In-Goo; Ahn, Hyung-Joon; Kim, Hho-Jung [Korea Institute of Nuclear Safety, 19, Kusungdong, Yousungku, Daejon 305-338 (Korea, Republic of)

2004-07-01T23:59:59.000Z

242

Relativistic tunneling and accelerated transmission  

E-Print Network [OSTI]

We obtain the solutions for the tunneling zone of a one-dimensional electrostatic potential in the relativistic (Dirac to Klein-Gordon) wave equation regime when the incoming wave packet exhibits the possibility of being almost totally transmitted through the potential barrier. The conditions for the occurrence of accelerated and, eventually, superluminal tunneling transmission probabilities are all quantified and the problematic superluminal interpretation originated from the study based on non-relativistic dynamics of tunneling is overcome. The treatment of the problem suggests revealing insights into condensed-matter experiments using electrostatic barriers in single- and bi-layer graphene, for which the accelerated tunneling effect deserves a more careful investigation.

Alex E. Bernardini

2007-06-26T23:59:59.000Z

243

Electric Transmission Line Siting Compact  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement Tuesday,DepartmentTheandElectric Transmission

244

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Transmission UpdateBPA Transmission Update  

E-Print Network [OSTI]

quality wind and solar resource potential are east of the Cascades Demand for NW exports to California. solar, wind in different locations)? Most of the regional load is west of the Cascades, but higher Recent BPA transmission upgrades provide increased capacity west out of the Lower Snake and Lowerp y

245

History of wireless power transmission  

SciTech Connect (OSTI)

The history of wireless power transmission at microwave frequencies is reviewed with emphasis upon the time period starting with the post World War II efforts to use the new microwave technology developed during the war. A nationally televised demonstration of a microwave powered helicopter at the Spencer Laboratory of the Raytheon Co., in 1964 was the result of these early efforts and broadly introduced the concept of wireless power transmission to scientific and engineering communities and to the public. Subsequent development efforts centered on improving the efficiency of the interconversion of d.c. and microwave power at the ends of the system to reach a demonstrated overall d.c. to d.c. system efficiency of 54% in 1974. The response to the requirements of applications such as the Solar Power Satellite and high altitude microwave powered aircraft have changed the direction of technology development and greatly expanded the technology base. Recent and current efforts are centered on examining the use of higher frequencies than the baseline 2.45 GHz, and in reducing the system costs at 2.45 GHz. 26 refs., 14 figs.

Brown, W.C. [Microwave Power Transmission Systems, Weston, MA (United States)] [Microwave Power Transmission Systems, Weston, MA (United States)

1996-12-31T23:59:59.000Z

246

Wind Integration, Transmission, and Resource Assessment andCharacteri...  

Broader source: Energy.gov (indexed) [DOE]

Integration, Transmission, and Resource Assessment and Characterization Projects Wind Integration, Transmission, and Resource Assessment and Characterization Projects From 2006 to...

247

Online Load Balancing for Related Machines 1 Piotr Berman  

E-Print Network [OSTI]

), the load of a machine i in schedule s and Load(s), the load of entire schedule s as follows: load(s; i) = 1On­line Load Balancing for Related Machines 1 Piotr Berman The Pennsylvania State University of randomized algorithms for this problem. Key Words: on­line algorithm, load balancing, related machines

Charikar, Moses

248

Non-Linear Transmission Line (NLTL) Microwave Source Lecture Notes the United States Particle Accelerator School  

SciTech Connect (OSTI)

We will quickly go through the history of the non-linear transmission lines (NLTLs). We will describe how they work, how they are modeled and how they are designed. Note that the field of high power, NLTL microwave sources is still under development, so this is just a snap shot of their current state. Topics discussed are: (1) Introduction to solitons and the KdV equation; (2) The lumped element non-linear transmission line; (3) Solution of the KdV equation; (4) Non-linear transmission lines at microwave frequencies; (5) Numerical methods for NLTL analysis; (6) Unipolar versus bipolar input; (7) High power NLTL pioneers; (8) Resistive versus reactive load; (9) Non-lineaer dielectrics; and (10) Effect of losses.

Russell, Steven J. [Los Alamos National Laboratory; Carlsten, Bruce E. [Los Alamos National Laboratory

2012-06-26T23:59:59.000Z

249

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

250

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

251

Independent review of estimated load reductions for PJM's small customer load response pilot project  

E-Print Network [OSTI]

of Estimated Load Reductions for PJM’s Small Customer Loadof Estimated Load Reductions for PJM’s Small Customer LoadResponse Pilot Project Prepared for PJM Interconnection, LLC

Heffner, G.; Moezzi, M.; Goldman, C.

2004-01-01T23:59:59.000Z

252

Transmission Reassignment Reporting Requirement - April 2, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Transmission Reassignment Reporting Requirement This notice...

253

Transmission and Generation Investment in Electricity Markets  

E-Print Network [OSTI]

Mar 4, 2015 ... The model incorporates investment decisions of the transmission operator and private firms in expectation of an energy-only market and ...

Grimm Veronika

2015-03-04T23:59:59.000Z

254

2009 National Electric Transmission Congestion Study - Oklahoma...  

Broader source: Energy.gov (indexed) [DOE]

- Oklahoma City Workshop 2009 National Electric Transmission Congestion Study - Oklahoma City Workshop On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City,...

255

Natural Gas Transmission Pipeline Siting Act (Florida)  

Broader source: Energy.gov [DOE]

This Act establishes a centralized and coordinated permitting process for the location of natural gas transmission pipeline corridors and the construction and maintenance of natural gas...

256

Final Report Navajo Transmission Project (NTP)  

SciTech Connect (OSTI)

The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

Bennie Hoisington; Steven Begay

2006-09-14T23:59:59.000Z

257

Transmission Expansion Planning Using an AC Model ...  

E-Print Network [OSTI]

Western Interconnection” under contract DOE-FOA0000068. ... problem to determine locations for placing new transmission ... KNITRO and BONMIN are de

Periodicals

2013-01-02T23:59:59.000Z

258

SunZia Southwest Transmission Project Comments  

Energy Savers [EERE]

Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

259

2012 National Electric Transmission Congestion Study: Preliminary...  

Broader source: Energy.gov (indexed) [DOE]

Meyer Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 2012 National Electric Transmission Congestion Study Preliminary Findings Stakeholder...

260

Energy Department, Arizona Utilities Announce Transmission Infrastruct...  

Office of Environmental Management (EM)

project that will serve the state's growing electrical energy needs, attract renewable energy development to the area, and strengthen the transmission system in the Southwestern...

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Exploring the Business Link Opportunity: Transmission & Clean...  

Energy Savers [EERE]

Jennifer Weddle, Greenberg Traurig LLP Rapid Response Team for Transmission: Laura Smith Morton, DOE Energy Storage: Michael Stosser, Day Pitney LLP Centennial West Clean...

262

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

263

Flexible Transmission in the Smart Grid  

E-Print Network [OSTI]

New England Outlook: Smart Grid is About Consumers,” Apr. [Transmission in the Smart Grid By Kory Walter Hedman ATransmission in the Smart Grid by Kory Walter Hedman Doctor

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

264

Detonator comprising a nonlinear transmission line  

DOE Patents [OSTI]

Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

Elizondo-Decanini, Juan M

2014-12-30T23:59:59.000Z

265

TransWest Express Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of the Anschutz Corporation. The Project consists of an overhead transmission line extending approximately 725 miles from south-central Wyoming crossing Colorado and...

266

1634 IEEE ANTENNAS AND WIRELESS PROPAGATION LETTERS, VOL. 12, 2013 A Compact Dual-Band Rectenna Using Slot-Loaded  

E-Print Network [OSTI]

, dual-band rectenna, dual-band rectifier, energy harvesting, wireless power transmission. I bands, RF energy harvesters capable of operating in multiple bands are of great importance. Nowadays by a microwave signal of available power of 9 dBm for a load resistor of 2.2 k . Index Terms--Dipole antenna

Tentzeris, Manos

267

Spinning Reserve From Responsive Loads  

SciTech Connect (OSTI)

Responsive load is the most underutilized reliability resource available to the power system today. It is currently not used at all to provide spinning reserve. Historically there were good reasons for this, but recent technological advances in communications and controls have provided new capabilities and eliminated many of the old obstacles. North American Electric Reliability Council (NERC), Federal Energy Regulatory Commission (FERC), Northeast Power Coordinating Council (NPCC), New York State Reliability Council (NYSRC), and New York Independent System Operator (NYISO) rules are beginning to recognize these changes and are starting to encourage responsive load provision of reliability services. The Carrier ComfortChoice responsive thermostats provide an example of these technological advances. This is a technology aimed at reducing summer peak demand through central control of residential and small commercial air-conditioning loads. It is being utilized by Long Island Power Authority (LIPA), Consolidated Edison (ConEd), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E). The technology is capable of delivering even greater response in the faster spinning reserve time frame (while still providing peak reduction). Analysis of demand reduction testing results from LIPA during the summer of 2002 provides evidence to back up this claim. It also demonstrates that loads are different from generators and that the conventional wisdom, which advocates for starting with large loads as better ancillary service providers, is flawed. The tempting approach of incrementally adapting ancillary service requirements, which were established when generators were the only available resources, will not work. While it is easier for most generators to provide replacement power and non-spinning reserve (the slower response services) than it is to supply spinning reserve (the fastest service), the opposite is true for many loads. Also, there is more financial reward for supplying spinning reserve than for supplying the other reserve services as a result of the higher spinning reserve prices. The LIPAedge program (LIPA's demand reduction program using Carrier ComfortChoice thermostats) provides an opportunity to test the use of responsive load for spinning reserve. With potentially 75 MW of spinning reserve capability already installed, this test program can also make an important contribution to the capacity needs of Long Island during the summer of 2003. Testing could also be done at ConEd ({approx}30 MW), SCE ({approx}15 MW), and/or SDG&E ({approx}15 MW). This paper is divided into six chapters. Chapter 2 discusses the contingency reserve ancillary services, their functions in supporting power system reliability, and their technical requirements. It also discusses the policy and tariff requirements and attempts to distinguish between ones that are genuinely necessary and ones that are artifacts of the technologies that were historically used to provide the services. Chapter 3 discusses how responsive load could provide contingency reserves (especially spinning reserve) for the power system. Chapter 4 specifically discusses the Carrier ComfortChoice responsive thermostat technology, the LIPAedge experience with that technology, and how the technology could be used to supply spinning reserve. Chapter 5 discusses a number of unresolved issues and suggests areas for further research. Chapter 6 offers conclusions and recommendations.

Kirby, B.J.

2003-04-08T23:59:59.000Z

268

PASSIVE DETECTION OF VEHICLE LOADING  

SciTech Connect (OSTI)

The Digital Imaging and Remote Sensing Laboratory (DIRS) at the Rochester Institute of Technology, along with the Savannah River National Laboratory is investigating passive methods to quantify vehicle loading. The research described in this paper investigates multiple vehicle indicators including brake temperature, tire temperature, engine temperature, acceleration and deceleration rates, engine acoustics, suspension response, tire deformation and vibrational response. Our investigation into these variables includes building and implementing a sensing system for data collection as well as multiple full-scale vehicle tests. The sensing system includes; infrared video cameras, triaxial accelerometers, microphones, video cameras and thermocouples. The full scale testing includes both a medium size dump truck and a tractor-trailer truck on closed courses with loads spanning the full range of the vehicle's capacity. Statistical analysis of the collected data is used to determine the effectiveness of each of the indicators for characterizing the weight of a vehicle. The final sensing system will monitor multiple load indicators and combine the results to achieve a more accurate measurement than any of the indicators could provide alone.

Garrett, A.

2012-01-03T23:59:59.000Z

269

Abstract--Electric energy transmission is essential for the operation of competitive energy markets. Transmission  

E-Print Network [OSTI]

1 Abstract-- Electric energy transmission is essential for the operation of competitive energy markets. Transmission expansion planning has been defined as a complex combinatorial optimization problem. The model proposed generates expansion plans under the Pareto optimality approach. It shows acceptable

Catholic University of Chile (Universidad CatĂłlica de Chile)

270

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network [OSTI]

Report.pdf Midwest ISO (MISO). 2003. Midwest TransmissionConference September 2007 MISO. 2007. Midwest Transmission2006 SDG&E Midwest ISO (MISO) ISO/RTO February 2007 MISO '06

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

271

Summit-Watertown transmission line project, South Dakota. Final Environmental Assessment  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) needs to rebuild the existing Summit-Watertown 115-kV transmission line, located in northeastern South Dakota, and western Minnesota. Nearly 60 percent of the existing facility was replaced in 1965 after severe ice-loading broke structures and wires. Because of the extensive loss of the line, surplus poles had to be used to replace the damaged H-frame structures. These were of varying sizes, causing improper structure loading. Additionally, the conductors and overhead shield wires have been spliced in numerous places. This provides additional space on these wires for icing and wind resistance, which in turn create problems for reliability. Finally, a progressive fungal condition has weakened the poles and, along with the improper loading, has created an unsafe condition for maintenance personnel and the general public.

Not Available

1993-12-01T23:59:59.000Z

272

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

2006. Transmission and Wind Energy: Capturing the Prevailingand Renewable Energy (Wind & Hydropower Technologiesand Renewable Energy Wind & Hydropower Technologies Program

Mills, Andrew D.

2009-01-01T23:59:59.000Z

273

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Interconnectivity.degree of network interconnectivity; and the level of studyof Transmission Network Interconnectivity A number of the

Mills, Andrew D.

2009-01-01T23:59:59.000Z

274

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

NREL/CP-500-35969. Global WindPower Conference. Chicago,Transmission Projects. ” Windpower 2007 Conference. Los

Mills, Andrew D.

2009-01-01T23:59:59.000Z

275

Residential Load Management Program and Pilot  

E-Print Network [OSTI]

In 1986 LCRA embarked on residential load management to control peak summer loads. At that time, LCRA was considered a summer peaking utility, and residential air conditioning and water heating systems were selected for control. The program...

Haverlah, D.; Riordon, K.

1994-01-01T23:59:59.000Z

276

Helicase Loading at Chromosomal Origins of Replication  

E-Print Network [OSTI]

Loading of the replicative DNA helicase at origins of replication is of central importance in DNA replication. As the first of the replication fork proteins assemble at chromosomal origins of replication, the loaded helicase ...

Bell, Stephen P.

277

Communication Load Reduction for Neural Network Implementations  

E-Print Network [OSTI]

the total amount of communication load, followed by a placement of partitions onto proces- sors 3]. We

Behnke, Sven

278

Plug Load Behavioral Change Demonstration Project  

SciTech Connect (OSTI)

This report documents the methods and results of a plug load study of the Environmental Protection Agency's Region 8 Headquarters in Denver, Colorado, conducted by the National Renewable Energy Laboratory. The study quantified the effect of mechanical and behavioral change approaches on plug load energy reduction and identified effective ways to reduce plug load energy. Load reduction approaches included automated energy management systems and behavioral change strategies.

Metzger, I.; Kandt, A.; VanGeet, O.

2011-08-01T23:59:59.000Z

279

Analysis Methodology for Industrial Load Profiles  

E-Print Network [OSTI]

ANALYSIS METHODOLOGY FOR INDUSTRIAL LOAD PROFILES Thomas W. Reddoch Executive Vice President Eleclrolek Concepts, Inc. Knoxvillc, Tennessee ABSTRACT A methodology is provided for evaluating the impact of various demand-side management... (OSM) options on industrial customers. The basic approach uses customer metered load profile data as a basis for the customer load shape. OSM technologies are represented as load shapes and are used as a basis for altering the customers existing...

Reddoch, T. W.

280

A Novel Approach to Determining Motor Load  

E-Print Network [OSTI]

A NOVEL APPROACH TO DETERMINING MOTOR LOAD by Michael Brown Georgia Tech Research Institute Atlanta, Georgia ABSTRACf Properly sized electric motors are essential if industrial plant efficiency is to be optimized and energy costs... minimized. Because of the difficully in making power measurements on three phase motors, loading is rarely, if ever, checked. A simple indication of motor load can be achieved by measuring operating speed because speed and load are almost linearly...

Brown, M.

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Investigation of sands subjected to dynamic loading  

E-Print Network [OSTI]

become apparent that dynamic, or sud- denly applied loads, present a different type of problem to the engineer. Wind loads on tall structures, pile driving, nuclear blasts, and many other familiar loading conditions cannot be de- scribed or handled... an earthquake or nuclear blast. Also under this category of loading is the pulse which would be purposely induced to fail the soil structure for the purpose of excavation or pile driving. As part of a broader research project concerned with pile dri- ving...

Reeves, Gary Neil

1967-01-01T23:59:59.000Z

282

System and method employing a minimum distance and a load feature database to identify electric load types of different electric loads  

DOE Patents [OSTI]

A method identifies electric load types of a plurality of different electric loads. The method includes providing a load feature database of a plurality of different electric load types, each of the different electric load types including a first load feature vector having at least four different load features; sensing a voltage signal and a current signal for each of the different electric loads; determining a second load feature vector comprising at least four different load features from the sensed voltage signal and the sensed current signal for a corresponding one of the different electric loads; and identifying by a processor one of the different electric load types by determining a minimum distance of the second load feature vector to the first load feature vector of the different electric load types of the load feature database.

Lu, Bin; Yang, Yi; Sharma, Santosh K; Zambare, Prachi; Madane, Mayura A

2014-12-23T23:59:59.000Z

283

Renewable Energy Transmission Initiative Phase 1A  

E-Print Network [OSTI]

Renewable Energy Transmission Initiative Phase 1A DRAFT REPORT MARCH 2008 RETI-1000-2008-001-D #12;RETI Stakeholder Steering Committee Renewable Energy Transmission Initiative Phase 1A DRAFT REPORT B are registered trademarks of Black & Veatch Holding Company #12;RETI Stakeholder Steering Committee Renewable

284

TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM  

E-Print Network [OSTI]

RFC: 793 TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM PROTOCOL SPECIFICATION September 1981 Admiralty Way Marina del Rey, California 90291 #12;#12;September 1981 Transmission Control Protocol TABLE ........................................... 12 2.9 Precedence and Security ...................................... 13 2.10 Robustness Principle

McBrien, Peter

285

Executive Forum on Solutions to Transmission Investment  

E-Print Network [OSTI]

. California ISO CenterPoint Energy Duke Energy Entergy EPRI Exelon FirstEnergy GE Energy Institut de recherche Transmission Co. MidAmerican Energy Midwest Independent Transmission System Operator (MISO) National Grid USA National Rural Electric Coop. Assn. New York ISO New York Power Authority Pacific Gas and Electric PJM

286

Electric Transmission Line Flashover Prediction System  

E-Print Network [OSTI]

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

287

Precision electron flow measurements in a disk transmission line.  

SciTech Connect (OSTI)

An analytic model for electron flow in a system driving a fixed inductive load is described and evaluated with particle in cell simulations. The simple model allows determining the impedance profile for a magnetically insulated transmission line given the minimum gap desired, and the lumped inductance inside the transition to the minimum gap. The model allows specifying the relative electron flow along the power flow direction, including cases where the fractional electron flow decreases in the power flow direction. The electrons are able to return to the cathode because they gain energy from the temporally rising magnetic field. The simulations were done with small cell size to reduce numerical heating. An experiment to compare electron flow to the simulations was done. The measured electron flow is {approx}33% of the value from the simulations. The discrepancy is assumed to be due to a reversed electric field at the cathode because of the inductive load and falling electron drift velocity in the power flow direction. The simulations constrain the cathode electric field to zero, which gives the highest possible electron flow.

Clark, Waylon T.; Pelock, Michael D.; Martin, Jeremy Paul; Jackson, Daniel Peter Jr.; Savage, Mark Edward; Stoltzfus, Brian Scott; Mendel, Clifford Will, Jr.; Pointon, Timothy David

2008-01-01T23:59:59.000Z

288

Properly Evaluating load-following products  

SciTech Connect (OSTI)

The authors briefly survey the jurisdictions where load-following products have been successfully used, examine the characteristics of the load-following products, and explain the shortcomings and inaccurate conclusions of previous analyses. A more thorough analysis reveals that the load-following products fulfill the public policy objectives for which they have been designed and do not adversely impact wholesale electricity markets.

Cavicchi, Joseph; Lemon, Andrew

2009-01-15T23:59:59.000Z

289

Transmission Congestion Study COMMENTS OF CONSOLIDATED EDISION...  

Broader source: Energy.gov (indexed) [DOE]

loads and improving reliability through the use of aggressive energy efficiency and demand response programs, and has added new generation since 2006." And, at the Workshop,...

290

1993 Pacific Northwest Loads and Resources Study.  

SciTech Connect (OSTI)

The Loads and Resources Study is presented in three documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The forecasted future electricity demands -- firm loads -- are subtracted from the projected capability of existing and {open_quotes}contracted for{close_quotes} resources to determine whether Bonneville Power Administration (BPA) and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, and additional conservation, contract purchases, or generating resources will be needed to meet load growth. The Pacific Northwest Loads and Resources Study analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resource in addition to the Federal system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. This study presents the Federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1994--95 through 2003--04.

United States. Bonneville Power Administration.

1993-12-01T23:59:59.000Z

291

Non destructive neutron diffraction measurements of cavities, inhomogeneities, and residual strain in bronzes of Ghiberti's relief from the Gates of Paradise  

SciTech Connect (OSTI)

Quantitative neutron studies of cultural heritage objects provide access to microscopic, mesoscopic, and macroscopic structures in a nondestructive manner. In this paper we present a neutron diffraction investigation of a Ghiberti Renaissance gilded bronze relief devoted to the measurement of cavities and inhomogeneities in the bulk of the sample, along with the bulk phase composition and residual strain distribution. The quantitative measurements allowed the determination of the re-melting parts extension, as well as improving current knowledge about the manufacturing process. The study provides significant and unique information to conservators and restorators about the history of the relief.

Festa, G.; Senesi, R.; Alessandroni, M.; Andreani, C.; Vitali, G. [Universita degli Studi di Roma Tor Vergata, Dipartimento di Fisica and Centre NAST Via della R. Scientifica 1, Rome (Italy); Porcinai, S.; Giusti, A. M. [Opificio delle Pietre Dure, Florence (Italy); Materna, T. [Institut Laue-Langevin 6, rue Jules Horowitz, BP 156, 38042 Grenoble Cedex 9 (France); Paradowska, A. M. [ISIS Neutron Scattering Facility-Science and Technology Facility Council, Rutherford Appleton Laboratory, Harwell Science and Innovation Campus, Didcot, OX11 0QX (United Kingdom)

2011-03-15T23:59:59.000Z

292

High loading uranium fuel plate  

DOE Patents [OSTI]

Two embodiments of a high uranium fuel plate are disclosed which contain a meat comprising structured uranium compound confined between a pair of diffusion bonded ductile metal cladding plates uniformly covering the meat, the meat having a uniform high fuel loading comprising a content of uranium compound greater than about 45 Vol. % at a porosity not greater than about 10 Vol. %. In a first embodiment, the meat is a plurality of parallel wires of uranium compound. In a second embodiment, the meat is a dispersion compact containing uranium compound. The fuel plates are fabricated by a hot isostatic pressing process.

Wiencek, Thomas C. (Bolingbrook, IL); Domagala, Robert F. (Indian Head Park, IL); Thresh, Henry R. (Palos Heights, IL)

1990-01-01T23:59:59.000Z

293

Automated fuel pin loading system  

DOE Patents [OSTI]

An automated loading system for nuclear reactor fuel elements utilizes a gravity feed conveyor which permits individual fuel pins to roll along a constrained path perpendicular to their respective lengths. The individual lengths of fuel cladding are directed onto movable transports, where they are aligned coaxially with the axes of associated handling equipment at appropriate production stations. Each fuel pin can be reciprocated axially and/or rotated about its axis as required during handling steps. The fuel pins are inserted as a batch prior to welding of end caps by one of two disclosed welding systems.

Christiansen, David W. (Kennewick, WA); Brown, William F. (West Richland, WA); Steffen, Jim M. (Richland, WA)

1985-01-01T23:59:59.000Z

294

Dynamic Load Balancing of Virtualized Database Services Using Hints and Load  

E-Print Network [OSTI]

server during runtime. Figure 1 shows the load curve of a typical interactive service. In the morningDynamic Load Balancing of Virtualized Database Services Using Hints and Load Forecasting Daniel-organizing infrastructures to react proactively. For this pur- pose we present two techniques: Short-term load forecasting

Kemper, Alfons

295

High payload six-axis load sensor  

DOE Patents [OSTI]

A repairable high-payload six-axis load sensor includes a table, a base, and at least three shear-pin load transducers removably mounted between the table and the base. Removable mounting permits easy replacement of damaged shear pins. Preferably, the shear-pin load transducers are responsive to shear forces imparted along the two axes perpendicular to an axis of minimum sensitivity characteristic of the transducer. Responsive to an applied shear force, each shear-pin load transducer can produce an electrical signal proportional to the reaction force. The load sensor can further include a structure for receiving the proportional electrical signals and computing the applied load corresponding to the proportional electrical signals. The computed load can be expressed in terms of a three-dimensional XYZ Cartesian coordinate system.

Jansen, John F. (Knoxville, TN); Lind, Randall F. (Knoxville, TN)

2003-01-01T23:59:59.000Z

296

Conductive Channel for Energy Transmission  

SciTech Connect (OSTI)

For many years the attempts to create conductive channels of big length were taken in order to study the upper atmosphere and to settle special tasks, related to energy transmission. There upon the program of creation of 'Impulsar' represents a great interest, as this program in a combination with high-voltage high repetition rate electrical source can be useful to solve the above mentioned problems (N. Tesla ideas for the days of high power lasers). The principle of conductive channel production can be shortly described as follows. The 'Impulsar' - laser jet engine vehicle - propulsion take place under the influence of powerful high repetition rate pulse-periodic laser radiation. In the experiments the CO{sub 2}-laser and solid state Nd:YAG laser systems had been used. Active impulse appears thanks to air breakdown (<30 km) or to the breakdown of ablated material on the board (>30 km), placed in the vicinity of the focusing mirror-acceptor of the breakdown waves. With each pulse of powerful laser the device rises up, leaving a bright and dense trace of products with high degree of ionization and metallization by conductive nano-particles due to ablation. Conductive dust plasma properties investigation in our experiments was produced by two very effective approaches: high power laser controlled ablation and by explosion of wire. Experimental and theoretical results of conductive canal modeling will be presented. The estimations show that with already experimentally demonstrated figures of specific thrust impulse the lower layers of the Ionosphere can be reached in several ten seconds that is enough to keep the high level of channel conductivity and stability with the help of high repetition rate high voltage generator. Some possible applications for new technology are highlighted.

Apollonov, Victor V. [A.M. Prokhorov General Physics Institute, Vavilov Str. 38, Moscow, 119991 (Russian Federation)

2011-11-10T23:59:59.000Z

297

Low reflectance radio frequency load  

DOE Patents [OSTI]

A load for traveling microwave energy has an absorptive volume defined by cylindrical body enclosed by a first end cap and a second end cap. The first end cap has an aperture for the passage of an input waveguide with a rotating part that is coupled to a reflective mirror. The inner surfaces of the absorptive volume consist of a resistive material or are coated with a coating which absorbs a fraction of incident RF energy, and the remainder of the RF energy reflects. The angle of the reflector and end caps is selected such that reflected RF energy dissipates an increasing percentage of the remaining RF energy at each reflection, and the reflected RF energy which returns to the rotating mirror is directed to the back surface of the rotating reflector, and is not coupled to the input waveguide. Additionally, the reflector may have a surface which generates a more uniform power distribution function axially and laterally, to increase the power handling capability of the RF load. The input waveguide may be corrugated for HE11 mode input energy.

Ives, R. Lawrence; Mizuhara, Yosuke M

2014-04-01T23:59:59.000Z

298

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect (OSTI)

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

299

ESTIMATED SIL LEVELS AND RISK COMPARISONS FOR RELIEF VALVES AS A FUNCTION OF TIME-IN-SERVICE  

SciTech Connect (OSTI)

Risk-based inspection methods enable estimation of the probability of spring-operated relief valves failing on demand at the United States Department of Energy's Savannah River Site (SRS) in Aiken, South Carolina. The paper illustrates an approach based on application of the Frechet and Weibull distributions to SRS and Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD) proof test results. The methodology enables the estimation of ANSI/ISA-84.00.01 Safety Integrity Levels (SILs) as well as the potential change in SIL level due to modification of the maintenance schedule. Current SRS practices are reviewed and recommendations are made for extending inspection intervals. The paper compares risk-based inspection with specific SILs as maintenance intervals are adjusted. Groups of valves are identified in which maintenance times can be extended as well as different groups in which an increased safety margin may be needed.

Harris, S.

2012-03-26T23:59:59.000Z

300

Hydrogen Delivery Technologies and Pipeline Transmission of Hydrogen  

E-Print Network [OSTI]

Hydrogen Delivery Technologies and Systems Pipeline Transmission of Hydrogen Strategic Initiatives, and Infrastructure Technologies Program #12;Pipeline Transmission of Hydrogen --- 2 Copyright: Design & Operation development) #12;Pipeline Transmission of Hydrogen --- 3 Copyright: Future H2 Infrastructure Wind Powered

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Spatially and polarization resolved plasmon mediated transmission through continuous metal  

E-Print Network [OSTI]

Spatially and polarization resolved plasmon mediated transmission through continuous metal films Y transmission through an embedded undulated continuous thin metal film under normal incidence. 1D undulations resolved, polarization independent transmission. Whereas the needed submicron microstructure lends itself

Boyer, Edmond

302

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES  

E-Print Network [OSTI]

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES ANNE-SOPHIE BONNET propagation in the microstrip transmission lines used in microelectronics. In the first part, the case of the perfectly conducting strip. Key words. superconducting transmission lines, waveguides, spectral analysis

Ramdani, Karim - Institut de Mathématiques �lie Cartan, Université Henri Poincaré

303

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines  

E-Print Network [OSTI]

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines Martin Gander problem for multiple coupled transmission lines by a so-called transverse partitioning technique. The WR mode transmission line problems. Previous longitudinal partitioning work using the classical WR

Gander, Martin J.

304

CHARACTERIZING LOSSES IN MICROSTRIP TRANSMISSION LINES Rashmi Pathak  

E-Print Network [OSTI]

CHARACTERIZING LOSSES IN MICROSTRIP TRANSMISSION LINES by Rashmi Pathak A dissertation submitted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1 Transmission Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2 Engineering) at the UNIVERSITY OF WISCONSIN­MADISON Summer 2005 #12;i Characterizing Losses in Transmission

Timbie, Peter

305

Investigation of Multi-Frequency Power Transmission and System  

E-Print Network [OSTI]

BACKGROUND .................................................................................. 6 A. High Voltage Direct Current Transmission (HVDC) ................ 6 B. Flexible AC Transmission System (FACTS) ............................ 12... ......................................................................................................................... 80 viii LIST OF FIGURES FIGURE Page 1 Schematic of a HVDC Transmission Line...

Barazarte Conte, Ronald

2012-10-19T23:59:59.000Z

306

Decision-Support Software for Grid Operators: Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation  

SciTech Connect (OSTI)

GENI Project: The CRA team is developing control technology to help grid operators more actively manage power flows and integrate renewables by optimally turning on and off entire power lines in coordination with traditional control of generation and load resources. The control technology being developed would provide grid operators with tools to help manage transmission congestion by identifying the facilities whose on/off status must change to lower generation costs, increase utilization of renewable resources and improve system reliability. The technology is based on fast optimization algorithms for the near to real-time change in the on/off status of transmission facilities and their software implementation.

None

2012-03-16T23:59:59.000Z

307

Bulk Modulus Capacitor Load Cells  

SciTech Connect (OSTI)

Measurement of forces present at various locations within the SSC Model Dipole collared coil assembly is of great practical interest to development engineers. Of particular interest are the forces between coils at the parting plane and forces that exist between coils and pole pieces. It is also desired to observe these forces under the various conditions that a magnet will experience such as: during the collaring process, post-collaring, under the influence of cryogens, and during field excitation. A twenty eight thousandths of an inch thick capacitor load cell which utilizes the hydrostatic condition of a stressed plastic dielectric has been designed. These cells are currently being installed on SSC Model Dipoles. The theory, development, and application of these cells will be discussed.

Dickey, C.E.

1990-04-01T23:59:59.000Z

308

High voltage load resistor array  

DOE Patents [OSTI]

A high voltage resistor comprising an array of a plurality of parallel electrically connected resistor elements each containing a resistive solution, attached at each end thereof to an end plate, and about the circumference of each of the end plates, a corona reduction ring. Each of the resistor elements comprises an insulating tube having an electrode inserted into each end thereof and held in position by one or more hose clamps about the outer periphery of the insulating tube. According to a preferred embodiment, the electrode is fabricated from stainless steel and has a mushroom shape at one end, that inserted into the tube, and a flat end for engagement with the end plates that provides connection of the resistor array and with a load.

Lehmann, Monty Ray (Smithfield, VA)

2005-01-18T23:59:59.000Z

309

Transmission Policy in the United States  

E-Print Network [OSTI]

Market Design (SMD) proposal. PJM’s market rules and transmission pricing, planning and investment policies are reviewed as an articulation of FERC’s RTO and SMD visions....

Joskow, Paul

2006-03-14T23:59:59.000Z

310

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

311

Transmission policy in the United States  

E-Print Network [OSTI]

This paper provides an overview of the development of electric power transmission access, pricing and investment policies in the U.S. over the last 15 years and evaluates the current state of those policies. Pre-liberalization ...

Joskow, Paul L.

2004-01-01T23:59:59.000Z

312

Data transmission element for downhole drilling components  

DOE Patents [OSTI]

A robust data transmission element for transmitting information between downhole components, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The data transmission element components include a generally U-shaped annular housing, a generally U-shaped magnetically conductive, electrically insulating element such as ferrite, and an insulated conductor. Features on the magnetically conducting, electrically insulating element and the annular housing create a pocket when assembled. The data transmission element is filled with a polymer to retain the components within the annular housing by filling the pocket with the polymer. The polymer can bond with the annular housing and the insulated conductor but preferably not the magnetically conductive, electrically insulating element. A data transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT)

2006-01-31T23:59:59.000Z

313

Transmission Issues and Power Exchanges in Texas  

E-Print Network [OSTI]

to build. This paper presents a historical background on the development of the transmission system and describes the problems of assessing the impact and properly pricing certain bulk power transactions. In addition, it briefly describes the Electro...

Hughes, H. L.

314

Electric Power Generation and Transmission (Iowa)  

Broader source: Energy.gov [DOE]

Electric power generating facilities with a combined capacity greater than 25 MW, as well as associated transmission lines, may not be constructed or begin operation prior to the issuance of a...

315

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network [OSTI]

In PJM for example, loads and generators that can follow theto generators and loads, who can follow operator’s second bya reflection of the load’s inability to follow minute-by-

Heffner, Grayson

2008-01-01T23:59:59.000Z

316

Preliminary Evaluation of Load Management for Electricity End Users  

E-Print Network [OSTI]

The planning, design and implementation of load management is complex and expensive. The results of a load management program are subject to numerous uncertainties related to load characteristics, power cost savings, load management costs...

Collier, S. E.

1984-01-01T23:59:59.000Z

317

A reliability cost-benefit analysis for HVDC transmission expansion planning  

SciTech Connect (OSTI)

A major portion of Manitoba Hydro's generation is located in the North on the Nelson River. The lower Nelson River generation is brought into the load centre in Southern Manitoba through an HVDC transmission system consisting of two bipoles, the first rated at 1680 MW at the rectifier and the second at 2000 MW. This paper presents the methodology used in arriving at the optimum Bipole 3 size using a reliability cost-benefit analysis. The analysis considers the forced outages of the generation and transmission systems using system outage statistics. The generator and valve group maintenance and the reduction in capability of thyristor valve groups during the summer season were also incorporated in the analysis. The load model used in the study was based on system data for the period 1980-1984. The criterion used in choosing the Bipole 3 size is to optimize the present worth value of the annual energy curtailment due to the HVDC system forced outages and the incremental installation cost of the transmission as the capacity of Bipole 3 is increased. The optimum Bipole 3 size based on the study is 2200 MW. This value is significantly lower than that based on a pole spare criterion used in the earlier development of the HVDC system. Finally, the need for validation of the outage data in evaluating future HVDC projects and the need for data collection and classification is indicated.

Kuruganty, P.R.S. (Manitoba Hydro, Winnipeg, Manitoba (CA)); Woodford, D.A. (Manitoba HVDC Research Centre, Winnipeg, Manitoba (CA))

1988-07-01T23:59:59.000Z

318

EIS-0447: Champlain Hudson Power Express Transmission Line Project...  

Broader source: Energy.gov (indexed) [DOE]

7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the...

319

EA-1880: Big Bend to Witten Transmission Line Project, South...  

Office of Environmental Management (EM)

880: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with...

320

OAHU Wind Integration And Transmission Study: Summary Report...  

Office of Environmental Management (EM)

OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory) OAHU Wind Integration And Transmission Study: Summary Report, NREL...

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Eastern Wind Integration and Transmission Study: Executive Summary...  

Office of Environmental Management (EM)

Eastern Wind Integration and Transmission Study: Executive Summary and Project Overview Eastern Wind Integration and Transmission Study: Executive Summary and Project Overview This...

322

Phase 2 Report: Oahu Wind Integration and Transmission Study...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba...

323

2006 National Electric Transmission Congestion Study and Related...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion...

324

Draft National Electric Transmission Congestion Study Now Available...  

Broader source: Energy.gov (indexed) [DOE]

Draft National Electric Transmission Congestion Study Now Available for Public Comment Draft National Electric Transmission Congestion Study Now Available for Public Comment August...

325

Plan to Conduct Electric Transmission Congestion Study: Federal...  

Broader source: Energy.gov (indexed) [DOE]

Plan to Conduct Electric Transmission Congestion Study: Federal Register Volume 76, No. 218 - Nov. 10, 2011 Plan to Conduct Electric Transmission Congestion Study: Federal Register...

326

In-situ Transmission Electron Microscopy and Spectroscopy Studies...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Electron Microscopy and Spectroscopy Studies of Interfaces in Li-ion Batteries: Challenges and In-situ Transmission Electron Microscopy and Spectroscopy Studies of...

327

Factsheet: An Initiative to Help Modernize Natural Gas Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Factsheet: An Initiative to Help Modernize Natural Gas Transmission and Distribution Infrastructure Factsheet: An Initiative to Help Modernize Natural Gas Transmission and...

328

QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution Meeting Date and...

329

QER Public Meeting in Portland, OR: Electricity Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Portland, OR: Electricity Transmission, Storage and Distribution - West QER Public Meeting in Portland, OR: Electricity Transmission, Storage and Distribution - West Meeting Date...

330

QER Public Meeting in Newark, NJ: Electricity Transmission and...  

Energy Savers [EERE]

Newark, NJ: Electricity Transmission and Distribution - East QER Public Meeting in Newark, NJ: Electricity Transmission and Distribution - East New Jersey Institute of Technology...

331

2012 Transmission and Energy Storage Peer Review Presentations...  

Broader source: Energy.gov (indexed) [DOE]

Transmission and Energy Storage Peer Review Presentations Available 2012 Transmission and Energy Storage Peer Review Presentations Available December 3, 2012 - 1:26pm Addthis...

332

Request for Information on Permitting of Transmission Lines:...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

333

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

334

Eastern Wind Integration and Transmission Study -- Preliminary Findings: Preprint  

SciTech Connect (OSTI)

This paper reviews the Eastern Wind Integration and Transmission Study, the development of wind datasets, the transmission analysis, and the results of wind integration analysis for four scenarios.

Corbus, D.; Milligan, M.; Ela, E.; Schuerger, M.; Zavadil, B.

2009-09-01T23:59:59.000Z

335

QER Public Meeting in New Orleans, LA: Petroleum Product Transmission...  

Energy Savers [EERE]

Orleans, LA: Petroleum Product Transmission & Distribution QER Public Meeting in New Orleans, LA: Petroleum Product Transmission & Distribution Meeting Date and Location: May 27,...

336

Dynamics of soft Nanomaterials captured by transmission electron...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Dynamics of soft Nanomaterials captured by transmission electron microscopy in liquid water. Dynamics of soft Nanomaterials captured by transmission electron microscopy in liquid...

337

DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 The purpose of...

338

Online Load Balancing for Related Machines 1 (Revised Piotr Berman  

E-Print Network [OSTI]

s as follows: load(s; i) = 1 v i X s(j)=i p j ; Load(s) = max i load(s; i) It is easy to observe that findingOn­line Load Balancing for Related Machines 1 (Revised Version) Piotr Berman The Pennsylvania State of randomized algorithms for this problem. Key Words: on­line algorithm, load balancing, related machines

Karpinski, Marek

339

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network [OSTI]

Load Following)Imbalance Management (Load Following) Energy Imbalanceload participation in ancillary service markets, we offer the following

Heffner, Grayson

2008-01-01T23:59:59.000Z

340

Loads Providing Ancillary Services: Review of International Experience  

E-Print Network [OSTI]

for generators. A partial list of load attributes andpartial list includes: • Minimum run times • Minimum off times • Minimum load

Heffner, Grayson

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

An Annotated Bibliography of High-Voltage Direct-Current Transmission and Flexible AC Transmission (FACTS) Devices, 1991-1993.  

SciTech Connect (OSTI)

References are contained for HVDC systems, converter stations and components, overhead transmission lines, cable transmission, system design and operations, simulation of high voltage direct current systems, high-voltage direct current installations, and flexible AC transmission system (FACTS).

Litzenberger, Wayne; Lava, Val

1994-08-01T23:59:59.000Z

342

Abstract --The need to determine adequate regulations in the transmission activity in deregulated environments does not  

E-Print Network [OSTI]

be followed. Index Terms--Transmission expansion, Transmission planning, Transmission systems, Transmission pricing, Open access. I INTRODUCTION he presence of economies of scale and the specificity

Dixon, Juan

343

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

2006. Transmission and Wind Energy: Capturing the Prevailing40 6.2 20% Wind Energy: Wind Deployment System (and Renewable Energy (Wind & Hydropower Technologies

Mills, Andrew D.

2009-01-01T23:59:59.000Z

344

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Planning (Xcel). 2006. Wind Integration Study Report OfTransmission Vision for Wind Integration. White Paper.Charles Smith (Utility Wind Integration Group), Lynn Coles (

Mills, Andrew D.

2009-01-01T23:59:59.000Z

345

Decentralized customerlevel under frequency load shedding in...  

Open Energy Info (EERE)

project focuses on a smart demand side management of household consumers. Modern communication technology enables the management of large groups of distributed loads under a...

346

System and method employing a self-organizing map load feature database to identify electric load types of different electric loads  

SciTech Connect (OSTI)

A method identifies electric load types of a plurality of different electric loads. The method includes providing a self-organizing map load feature database of a plurality of different electric load types and a plurality of neurons, each of the load types corresponding to a number of the neurons; employing a weight vector for each of the neurons; sensing a voltage signal and a current signal for each of the loads; determining a load feature vector including at least four different load features from the sensed voltage signal and the sensed current signal for a corresponding one of the loads; and identifying by a processor one of the load types by relating the load feature vector to the neurons of the database by identifying the weight vector of one of the neurons corresponding to the one of the load types that is a minimal distance to the load feature vector.

Lu, Bin; Harley, Ronald G.; Du, Liang; Yang, Yi; Sharma, Santosh K.; Zambare, Prachi; Madane, Mayura A.

2014-06-17T23:59:59.000Z

347

Wind loading on solar collectors  

SciTech Connect (OSTI)

The present design methodology for the determination of wind loading on the various solar collectors has been reviewed and assessed. The total force coefficients of flat plates of aspect ratios 1.0 and 3.0, respectively, at various angles of attack obtained by using the guidelines of the ANSI A58.1-1982, have been compared with those obtained by using the methodology of the ASCE Task Committee, 1961, and the experimental results of the full-scale test of heliostats by Peglow. The turbulent energy spectra, currently employed in the building code, are compared with those of Kaimal et al., Lumley, and Ponofsky for wind velocities of 20.0 m/s and 40.24 m/s at an elevation of 9.15 m. The longitudinal spectra of the building code overestimates the Kaimal spectra in the frequency range of 0.007 Hz to 0.08 Hz and underestimates beyond the frequency of 0.08 Hz. The peak angles of attack, on the heliostat, stowed in horizontal position, due to turbulent vertical and lateral components of wind velocity, have been estimated by using Daniel's methodology for three wind velocities and compared with the value suggested by the code. The experimental results of a simple test in the laboratory indicate the feasibility of decreasing the drag forces of the flat plate by reducing the solidity ratio.

Bhaduri, S.; Murphy, L.M.

1985-06-01T23:59:59.000Z

348

Effects of dynamic conditions and sheave efficiency on hook load, derrick load, and line tension  

E-Print Network [OSTI]

EFFECTS OF DYNAMIC CONDITIONS AND SHEAVE EFFICIENCY ON HOOK LOAD, DERRICK LOAD, AND LINE TENSION A Thesis by GREGORY ROBERT LUKE Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE May 1991 Major Subject: Petroleum Engineering EFFECTS OF DYNAMIC CONDITIONS AND SHEAVE EFFICIENCY ON HOOK LOAD, DERRICK LOAD, AND LINE TENSION A Thesis by GREGORY ROBERT LUKE Approved as to style and content by: Hans...

Luke, Gregory Robert

1991-01-01T23:59:59.000Z

349

Heavy duty insulator assemblies for 500-kV bulk power transmission line with large diameter octagonalbundled conductor  

SciTech Connect (OSTI)

This paper describes the design procedure and the results of field tests on mechanical performances of insulator assemblies newly developed to support octagonal-bundled conductors for 500-kV bulk power transmission. Taking account of conductor-motion-induced peak tensile load, fatigue, torsional torque and others, a successful design has been achieved in two prototype assemblies for such heavy mechanical duties as encountered during conductor galloping or swing. This has been proved throughout three years of the field tests.

Tsujimoto, K.; Hayase, I.; Hirai, J.; Inove, M.; Naito, K.; Yukino, T.

1982-11-01T23:59:59.000Z

350

Hydraulic system for a ratio change transmission  

DOE Patents [OSTI]

Disclosed is a drive assembly (10) for an electrically powered vehicle (12). The assembly includes a transaxle (16) having a two-speed transmission (40) and a drive axle differential (46) disposed in a unitary housing assembly (38), an oil-cooled prime mover or electric motor (14) for driving the transmission input shaft (42), an adapter assembly (24) for supporting the prime mover on the transaxle housing assembly, and a hydraulic system (172) providing pressurized oil flow for cooling and lubricating the electric motor and transaxle and for operating a clutch (84) and a brake (86) in the transmission to shift between the two-speed ratios of the transmission. The adapter assembly allows the prime mover to be supported in several positions on the transaxle housing. The brake is spring-applied and locks the transmission in its low-speed ratio should the hydraulic system fail. The hydraulic system pump is driven by an electric motor (212) independent of the prime mover and transaxle.

Kalns, Ilmars (Northville, MI)

1981-01-01T23:59:59.000Z

351

REACTIVE LOAD MODELINGIMPACTS ONNODAL PRICESINPOOL MODELELECTRICITYMARKETS  

E-Print Network [OSTI]

REACTIVE LOAD MODELINGIMPACTS ONNODAL PRICESINPOOL MODELELECTRICITYMARKETS EttoreBompard, Enrico of the nodal prices in competitive electricity markets based on the Pool paradigm. Such prices focus of the paper is on the explicit evaluation of the impactsof the reactive load onthenodal real

Gross, George

352

1997 Pacific Northwest Loads and Resources Study.  

SciTech Connect (OSTI)

The 1997 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. Data detailing Pacific Northwest non-utility generating (NUG) resources is also available upon request. This analysis updates the 1996 pacific Northwest Loads and Resources Study, published in December 1996. In this loads and resources study, resource availability is compared with a medium forecast of electricity consumption. This document analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system which includes loads and resources in addition to the Federal system. This study presents the Federal system and regional analyses for the medium load forecast. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1998--99 through 2007--08.

United States. Bonneville Power Administration.

1997-12-01T23:59:59.000Z

353

Load Management DSM: Past, Present & Future  

E-Print Network [OSTI]

Load Management has grown in acceptance over the past several decades as a reliable means to provide a demand-side resource of demand capacity. This paper first reviews the significant break-throughs of load management technology then sets the stage...

Gardner, E.

1994-01-01T23:59:59.000Z

354

Nonparametric models for electricity load forecasting  

E-Print Network [OSTI]

Electricity consumption is constantly evolving due to changes in people habits, technological innovations1 Nonparametric models for electricity load forecasting JANUARY 23, 2015 Yannig Goude, Vincent at University Paris-Sud 11 Orsay. His research interests are electricity load forecasting, more generally time

Genève, Université de

355

Static load testing of a heliostat drive  

SciTech Connect (OSTI)

The drive designed and built by the Solar Power Engineering Company (SPECO) for its large area heliostat failed under high wind loads during a winter storm. This report details the testing and analysis done to verify the load capabilities of the rebuilt heliostat drive. Changes in design and improvements in fabrication resulted in a usable drive. 12 figs., 7 tabs.

Grossman, J.W.

1991-10-01T23:59:59.000Z

356

Apparatus for loading a band saw blade  

DOE Patents [OSTI]

A band saw blade is loaded between pairs of guide wheels upon tensioning the blade by guiding the blade between pairs of spaced guide plates which define converging slots that converge toward the guide wheels. The approach is particularly useful in loading blades on underwater band saw machines used to cut radioactive materials. 2 figs.

Reeves, S.R.

1990-03-20T23:59:59.000Z

357

Thermionic converter in load-switching mode  

SciTech Connect (OSTI)

An electrical equivalent circuit is proposed for a thermionic electrogenerating element. It is suitable for calculation of transients in load-switching mode. Formulas are given for estimating circuit parameters. A sample numerical calculation is given for the transient between no-load and short-circuit regimes. The results may be employed to identify experimental data in the frequency domain.

Mendel'baum, M.A.; Es'kov, V.D.

1983-01-01T23:59:59.000Z

358

Load Forecast For use in Resource Adequacy  

E-Print Network [OSTI]

-term Electricity Demand Forecasting System 1) Obtain Daily Regional Temperatures 6) Estimate Daily WeatherLoad Forecast 2019 For use in Resource Adequacy Massoud Jourabchi #12;In today's presentation d l­ Load forecast methodology ­ Drivers of the forecast f i­ Treatment of conservation

359

Steam Load Reduction Guidance Emergency Management Program  

E-Print Network [OSTI]

Steam Load Reduction Guidance Emergency Management Program v October 2014 Steam_Load_Reduction_Guidance_DSRDSR 1.0 PurposeandScope Utilities provides steam to the campus community for space heating, hot water in the steam distribution system or the Central Energy Plant, the preservation of building infrastructure

Pawlowski, Wojtek

360

Using Utility Load Data to Estimate Demand for Space Cooling and Potential for Shiftable Loads  

SciTech Connect (OSTI)

This paper describes a simple method to estimate hourly cooling demand from historical utility load data. It compares total hourly demand to demand on cool days and compares these estimates of total cooling demand to previous regional and national estimates. Load profiles generated from this method may be used to estimate the potential for aggregated demand response or load shifting via cold storage.

Denholm, P.; Ong, S.; Booten, C.

2012-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

An Evaluation of the HVAC Load Potential for Providing Load Balancing Service  

SciTech Connect (OSTI)

This paper investigates the potential of providing aggregated intra-hour load balancing services using heating, ventilating, and air-conditioning (HVAC) systems. A direct-load control algorithm is presented. A temperature-priority-list method is used to dispatch the HVAC loads optimally to maintain consumer-desired indoor temperatures and load diversity. Realistic intra-hour load balancing signals were used to evaluate the operational characteristics of the HVAC load under different outdoor temperature profiles and different indoor temperature settings. The number of HVAC units needed is also investigated. Modeling results suggest that the number of HVACs needed to provide a {+-}1-MW load balancing service 24 hours a day varies significantly with baseline settings, high and low temperature settings, and the outdoor temperatures. The results demonstrate that the intra-hour load balancing service provided by HVAC loads meet the performance requirements and can become a major source of revenue for load-serving entities where the smart grid infrastructure enables direct load control over the HAVC loads.

Lu, Ning

2012-09-30T23:59:59.000Z

362

Time and Cognitive Load 1 Time and Cognitive Load in Working Memory  

E-Print Network [OSTI]

Time and Cognitive Load 1 Time and Cognitive Load in Working Memory Pierre Barrouillet*, Sophie Bourgogne Running head: Time and Cognitive Load Corresponding author: Pierre Barrouillet Pierre manuscript, published in "Journal of Experimental Psychology: Learning, Memory, and Cognition 33, 3 (2007

Paris-Sud XI, Université de

363

The inherent inefficiency of simultaneously feasible financial transmission rights auctions  

E-Print Network [OSTI]

Electricity auction Simultaneous feasibility Transmission pricing Empirical evidence from the New York ISO

Oren, Shmuel S.

364

Questions and Issues on Hydrogen Pipeline Transmission of Hydrogen  

E-Print Network [OSTI]

Questions and Issues on Hydrogen Pipelines Pipeline Transmission of Hydrogen Doe Hydrogen Pipeline Working Group Meeting August 31, 2005 #12;Pipeline Transmission of Hydrogen --- 2 Copyright: Air Liquide Transmission of Hydrogen --- 3 Copyright: #12;Pipeline Transmission of Hydrogen --- 4 Copyright: 3. Special

365

Single-mode optical fiber for high-power, low-loss UV transmission  

E-Print Network [OSTI]

We report large-mode-area solid-core photonic crystal fibers made from fused silica which resist ultraviolet (UV) solarization even at relatively high optical powers. Using a process of hydrogen loading and UV irradiation of the fibers, we demonstrate stable single-mode transmission for fiber output powers of 10 mW at 280 nm and 125 mW at 313 nm (limited only by the available laser power) over hundreds of hours. Fiber attenuation ranges from 0.87 dB/m to 0.13 dB/m at these wavelengths, and is unaffected by bending for radii above 50 mm.

Colombe, Yves; Wilson, Andrew C; Leibfried, Dietrich; Wineland, David J

2014-01-01T23:59:59.000Z

366

Single-mode optical fiber for high-power, low-loss UV transmission  

E-Print Network [OSTI]

We report large-mode-area solid-core photonic crystal fibers made from fused silica that resist ultraviolet (UV) solarization even at relatively high optical powers. Using a process of hydrogen loading and UV irradiation of the fibers, we demonstrate stable single-mode transmission over hundreds of hours for fiber output powers of 10 mW at 280 nm and 125 mW at 313 nm (limited only by the available laser power). Fiber attenuation ranges from 0.9 dB/m to 0.13 dB/m at these wavelengths, and is unaffected by bending for radii above 50 mm.

Yves Colombe; Daniel H. Slichter; Andrew C. Wilson; Dietrich Leibfried; David J. Wineland

2014-08-08T23:59:59.000Z

367

Wave transmission and mooring-force characteristics of pipe-tire floating breakwaters  

SciTech Connect (OSTI)

The results are presented of a series of prototype scale tests of a floating breakwater that incorporates massive cylindrical members (steel or concrete pipes, telephone poles, etc.) in a matrix of scrap truck or automobile tires, referred to as the Pipe-Tire Breakwater (PT-Breakwater). Tests were conducted in the large wave tank at the US Army Coastal Engineering Research Center (CERC). Breakwater modules were preassembled at SUNY in Buffalo, New York, and then transported to CERC by truck, where final assembly on location was again performed by SUNY personnel. Wave-tank tests were conducted jointly by CERC and SUNY personnel. A series of wave-tank experiments and mooring system load-deflection tests were performed, and are described. Wave-transmission and mooring-load characteristics, based on 402 separate tests, were established and are reported. (LCL)

Harms, Volker W.; Westerink, Joannes J.

1980-10-01T23:59:59.000Z

368

Downhole transmission system comprising a coaxial capacitor  

DOE Patents [OSTI]

A transmission system in a downhole component comprises a plurality of data transmission elements. A coaxial cable having an inner conductor and an outer conductor is disposed within a passage in the downhole component such that at least one capacitor is disposed in the passage and having a first terminal coupled to the inner conductor and a second terminal coupled to the outer conductor. Preferably the transmission element comprises an electrically conducting coil. Preferably, within the passage a connector is adapted to electrically connect the inner conductor of the coaxial cable and the lead wire. The coaxial capacitor may be disposed between and in electrically communication with the connector and the passage. In another embodiment a connector is adapted to electrical connect a first and a second portion of the inner conductor of the coaxial cable and a coaxial capacitor is in electrical communication with the connector and the passage.

Hall, David R. (Provo, UT); Pixton, David S. (Lehi, UT); Johnson, Monte L. (Orem, UT); Bartholomew, David B. (Springville, UT); Hall, Jr., H. Tracy (Provo, UT); Rawle, Michael (Springville, UT)

2011-05-24T23:59:59.000Z

369

MIDWEST ISO UPDATE Sherman Elliott  

E-Print Network [OSTI]

power congestion through locational marginal pricing (LMP) energy market Long term regional transmission minutes · Manage congestion via Locational Marginal Pricing (LMP), Transmission Loading Relief (TLR reserve margin #12;9 MISO Market Operations Locational Marginal Pricing (LMP) based upon Security

Tesfatsion, Leigh

370

EC Transmission Line Risk Identification and Analysis  

SciTech Connect (OSTI)

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

371

Transmission grid access and pricing in Norway, Spain, and California: A comparative study  

E-Print Network [OSTI]

incentives given by transmission pricing form the foundationhas focussed on transmission pricing, monopoly regulation,

Gronli, Helle; Gomez San Ramon, Tomas; Marnay, Chris

1999-01-01T23:59:59.000Z

372

Radio-Frequency Interference (RFI) From Extra-High-Voltage (EHV) Transmission Lines  

E-Print Network [OSTI]

-current (HVAC) transmission lines; high-voltage direct-current (HVDC) transmission lines will be addressed

Ellingson, Steven W.

373

Synthesis of polyoxometalate-loaded epoxy composites  

DOE Patents [OSTI]

The synthesis of a polyoxometalate-loaded epoxy uses a one-step cure by applying an external stimulus to release the acid from the polyoxometalate and thereby catalyze the cure reaction of the epoxy resin. Such polyoxometalate-loaded epoxy composites afford the cured epoxy unique properties imparted by the intrinsic properties of the polyoxometalate. For example, polyoxometalate-loaded epoxy composites can be used as corrosion resistant epoxy coatings, for encapsulation of electronics with improved dielectric properties, and for structural applications with improved mechanical properties.

Anderson, Benjamin J

2014-10-07T23:59:59.000Z

374

Marketing Plan for Transmission Planning Services  

E-Print Network [OSTI]

well because of its people, business market and industry; it is always a good idea to be on the lookout for new markets and clients in other industries and markets. Transmission planning has always been a steady market for the electrical industry...

Tu, Linh

2006-12-15T23:59:59.000Z

375

A neutron transmission study of environmental Gd  

E-Print Network [OSTI]

A new method for the determination of environmental Gd by neutron transmission (NT) experiments is proposed. The NT method is based on the measurements of neutron spectra passing through a target. From the attenuation neutron spectra new data as concentration, width, resonance energies and cross section have been obtained.

Cristiana Oprea; Ioan Alexandru Oprea; Alexandru Mihul

2014-06-02T23:59:59.000Z

376

Transmission line environmental assessment guidance document  

SciTech Connect (OSTI)

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

377

Extraordinary acoustic transmission mediated by Helmholtz resonators  

SciTech Connect (OSTI)

We demonstrate perfect transmission of sound through a rigid barrier embedded with Helmholtz resonators. The resonators are confined within a waveguide and they are oriented such that one neck protrudes onto each side of the barrier. Perfect sound transmission occurs even though the open area of the necks is less than 3% of the barrier area. Maximum transmission occurs at the resonant frequency of the Helmholtz resonator. Because the dimensions of the Helmholtz resonators are much smaller than the resonant wavelength, the transmission is independent of the direction of sound on the barrier and of the relative placement of the necks. Further, we show that the transmitted sound experiences a continuous phase transition of ? radians as a function of frequency through resonance. In simulations of adjacent resonators with slightly offset resonance frequencies, the phase difference leads to destructive interference. By expanding the simulation to a linear array of tuned Helmholtz resonators we show that it is possible to create an acoustic lens. The ability of Helmholtz resonator arrays to manipulate the phase of a plane acoustic wave enables a new class of sonic beam-forming devices analogous to diffractive optics.

Koju, Vijay [Computation Science Program, Middle Tennessee State University, Murfreesboro, Tennessee 37132 (United States); Rowe, Ebony [Department of Physics and Astronomy, Middle Tennessee State University, Murfreesboro, Tennessee 37132 (United States); Robertson, William M., E-mail: William.Robertson@mtsu.edu [Computation Science Program, Middle Tennessee State University, Murfreesboro, Tennessee 37132 (United States); Department of Physics and Astronomy, Middle Tennessee State University, Murfreesboro, Tennessee 37132 (United States)

2014-07-15T23:59:59.000Z

378

HVDC transmission: a path to the future?  

SciTech Connect (OSTI)

Direct current transmission has been the poor stepchild of the U.S. electric industry. Although early-generation plants were based on DC technology, it was soon deemed uneconomical to transmit electricity over long distances, but it now appears poised for a change. Both the increasing technical potential and changing economics of HVDC lines promise a growing role in the future. (author)

Teichler, Stephen L.; Levitine, Ilia

2010-05-15T23:59:59.000Z

379

Policy Issues for Retail Beamed Power Transmission  

E-Print Network [OSTI]

solar electric power using retail delivery of beamed power. Recent advances in power beaming have made to enable widespread adoption of this clean and sustainable contribution to meeting energy needs. It is seen to micro-renewable energy resource exploitation since wired power transmission is only cost effective over

380

Transmission Rights and Market Power James Bushnell  

E-Print Network [OSTI]

wholesale electricity markets, and their associated Independent System Operators (ISOs), now formingPWP-062 Transmission Rights and Market Power James Bushnell April, 1999 This paper is part of the working papers series of the Program on Workable Energy Regulation (POWER). POWER is a program

California at Berkeley. University of

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

TRANSMISSION OPEN ACCESS IN CHILE Hugh Rudnick  

E-Print Network [OSTI]

increasing attention by power utilities and regulatory state bodies worldwide [1]. Many countries have Policy Group, John F. Kennedy School of Government, Cambridge, Massachusetts, October 27-28th, 1994 and consumers. The system is to be paid by all users (included the user actually owning the transmission network

Catholic University of Chile (Universidad CatĂłlica de Chile)

382

Methods and systems for micro transmissions  

DOE Patents [OSTI]

Methods and systems for micro transmissions for a micro machine may comprise an input shaft assembly coupled to a micro actuator, an output shaft assembly coupled to a micro shaft, and one or more power conversion elements operable to convert a first type of movement from the micro actuator into a second, disparate type of movement for the micro shaft.

Stalford, Harold L

2014-12-23T23:59:59.000Z

383

Bordereau de transmission accident du travail  

E-Print Network [OSTI]

Bordereau de transmission accident du travail Service des pensions et accidents du travail accidents du travail du CNRS Accompagné des pièces requises Nom .................................................... Prénom ........................ Matricule ...... Composition du dossier Observations Déclaration d'accident

Pouyanne, Nicolas

384

Efficient Spectral Methods for Transmission Eigenvalues and ...  

E-Print Network [OSTI]

Mar 20, 2014 ... Recently a new method using transmission eigen- values to estimate the index of ..... eigenvalue µ(D) coincides with the value k1(D,n) obtained from the far field data: AlgorithmN n0 ..... H1 semi-norm by u 2 ? =? 1. ?1 u2 ?dt ...

2014-03-24T23:59:59.000Z

385

Technical evaluation report, TMI action NUREG-0737 (II.D.1), relief and safety valve testing, Comanche Peak, Unit 2, Docket No. 50-446  

SciTech Connect (OSTI)

In the past, safety and relief valves installed in the primary coolant system of light water reactors have performed improperly. As a result, the authors of NUREG-0578 (TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations) and, subsequently, NUREG-0737 (Clarification of TMI Action Plan Requirements) recommended development and completion of programs to do two things. First, the programs should reevaluate the functional performance capabilities of pressurized water reactor safety, relief, and block valves. Second, they should verify the integrity of the pressurizer safety and relief valve piping systems for normal, transient, and accident conditions. This report documents the review of those programs by EG&G Idaho, Inc. Specifically, this report documents the review of the Comanche Peak, Unit 2, Applicant response to the requirements of NUREG-0578 and NUREG-0737. This review found the Applicant provided an acceptable response reconfirming they met General Design Criteria 14, 15, and 30 of Appendix A to 10 CFR 50 for the subject equipment.

Fineman, C.P.

1993-01-01T23:59:59.000Z

386

Load apparatus and method for bolt-loaded compact tension test specimen  

DOE Patents [OSTI]

A bolt-loaded compact tension test specimen load apparatus includes: (a) a body having first and second opposing longitudinal ends, the first end comprising an externally threaded portion sized to be threadedly received within the test specimen threaded opening; (b) a longitudinal loading rod having first and second opposing longitudinal ends, the loading rod being slidably received in a longitudinal direction within the body internally through the externally threaded portion and slidably extending longitudinally outward of the body first longitudinal end; (c) a force sensitive transducer slidably received within the body and positioned to engage relative to the loading rod second longitudinal end; and (d) a loading bolt threadedly received relative to the body, the loading bolt having a bearing end surface and being positioned to bear against the transducer to forcibly sandwich the transducer between the loading bolt and loading rod. Also disclosed is a method of in situ determining applied force during crack propagation in a bolt-loaded compact tension test specimen. 6 figs.

Buescher, B.J. Jr.; Lloyd, W.R.; Ward, M.B.; Epstein, J.S.

1997-02-04T23:59:59.000Z

387

Load apparatus and method for bolt-loaded compact tension test specimen  

DOE Patents [OSTI]

A bolt-loaded compact tension test specimen load apparatus includes: a) a body having first and second opposing longitudinal ends, the first end comprising an externally threaded portion sized to be threadedly received within the test specimen threaded opening; b) a longitudinal loading rod having first and second opposing longitudinal ends, the loading rod being slidably received in a longitudinal direction within the body internally through the externally threaded portion and slidably extending longitudinally outward of the body first longitudinal end; c) a force sensitive transducer slidably received within the body and positioned to engage relative to the loading rod second longitudinal end; and d) a loading bolt threadedly received relative to the body, the loading bolt having a bearing end surface and being positioned to bear against the transducer to forcibly sandwich the transducer between the loading bolt and loading rod. Also disclosed is a method of in situ determining applied force during crack propagation in a bolt-loaded compact tension test specimen.

Buescher, Jr., Brent J. (Idaho Falls, ID); Lloyd, W. Randolph (Idaho Falls, ID); Ward, Michael B. (Idaho Falls, ID); Epstein, Jonathan S. (Idaho Falls, ID)

1997-01-01T23:59:59.000Z

388

Load-follow control simulation with optimization  

SciTech Connect (OSTI)

For the simulation of load-follow control operation of pressurized water reactors (PWRs), the system model needs to describe both primary and secondary system behaviors, because the load-change signal in the secondary system delivers a change in the primary system through the thermal-hydraulic interactions in the steam generator. In this study, the characteristics of load-follow control for a PWR were investigated using a one-dimensional core model combined with a simplified nuclear steam supply system model using optimization. The overall system model includes one-dimensional core neutronics with all the space-dependent feedback effects, Xe-I dynamics, core thermal balances, primary loop thermal balances, and steam generator dynamic responses to turbine load changes. The final system equations were manipulated for the lumped parameter representations by using the model expansion technique for the core model.

Yim, Man-Sung; Christenson, J.M.

1989-01-01T23:59:59.000Z

389

Modeling and control of thermostatically controlled loads  

SciTech Connect (OSTI)

As the penetration of intermittent energy sources grows substantially, loads will be required to play an increasingly important role in compensating the fast time-scale fluctuations in generated power. Recent numerical modeling of thermostatically controlled loads (TCLs) has demonstrated that such load following is feasible, but analytical models that satisfactorily quantify the aggregate power consumption of a group of TCLs are desired to enable controller design. We develop such a model for the aggregate power response of a homogeneous population of TCLs to uniform variation of all TCL setpoints. A linearized model of the response is derived, and a linear quadratic regulator (LQR) has been designed. Using the TCL setpoint as the control input, the LQR enables aggregate power to track reference signals that exhibit step, ramp and sinusoidal variations. Although much of the work assumes a homogeneous population of TCLs with deterministic dynamics, we also propose a method for probing the dynamics of systems where load characteristics are not well known.

Backhaus, Scott N [Los Alamos National Laboratory; Sinitsyn, Nikolai [Los Alamos National Laboratory; Kundu, S. [UNIV OF MICHIGAN; Hiskens, I. [UNIV OF MICHIGAN

2011-01-04T23:59:59.000Z

390

Impact of load type on microgrid stability  

E-Print Network [OSTI]

Microgrids show great promise as a means of integrating distributed generation sources into the public grid distribution system. In order to provide uninterrupted,high quality power to local loads, microgrids must have the ...

Monnin, Jared P

2012-01-01T23:59:59.000Z

391

Raman spectra of aligned carbon micro-coils and their impedance characteristics under loads  

SciTech Connect (OSTI)

Scanning and transmission electron microscopy were used to characterize the morphology of the carbon microcoils (CMCs). The Raman spectra showed that CMCs had local regular structure as I{sub D}/I{sub G}?=?0.841. Then, aligned CMCs/silicone–rubber composites (5?×?5?×?1 mm{sup 3}) were fabricated by coating of silicone rubber on the CMCs. Their alternating current impedance characteristics were measured as a function of applied load and the pressure sensitivity was discussed. The results showed that the impedance decreased as the increasing applied load, and the sample with less CMCs owned high pressure sensitivity, which indicated a novel composite film could act as an alternative of tactile sensor.

Tao, Wang; Yabo, Zhu, E-mail: zhuyabo@163.com; Heliang, Fan; Zhicheng, Ju; Lei, Chen; Zhengyuan, Wang [School of Materials Science and Engineering, China University of Mining and Technology, Xu Zhou, Jiangsu 221116 (China)

2014-02-21T23:59:59.000Z

392

System for loading executable code into volatile memory in a downhole tool  

DOE Patents [OSTI]

A system for loading an executable code into volatile memory in a downhole tool string component comprises a surface control unit comprising executable code. An integrated downhole network comprises data transmission elements in communication with the surface control unit and the volatile memory. The executable code, stored in the surface control unit, is not permanently stored in the downhole tool string component. In a preferred embodiment of the present invention, the downhole tool string component comprises boot memory. In another embodiment, the executable code is an operating system executable code. Preferably, the volatile memory comprises random access memory (RAM). A method for loading executable code to volatile memory in a downhole tool string component comprises sending the code from the surface control unit to a processor in the downhole tool string component over the network. A central processing unit writes the executable code in the volatile memory.

Hall, David R. (Provo, UT); Bartholomew, David B. (Springville, UT); Johnson, Monte L. (Orem, UT)

2007-09-25T23:59:59.000Z

393

MCO loading and cask loadout technical manual  

SciTech Connect (OSTI)

A compilation of the technical basis for loading a multi-canister overpack (MCO) with spent nuclear fuel and then placing the MCO into a cask for shipment to the Cold Vacuum Drying Facility. The technical basis includes a description of the process, process technology that forms the basis for loading alternatives, process control considerations, safety considerations, equipment description, and a brief facility structure description.

PRAGA, A.N.

1998-10-01T23:59:59.000Z

394

Gearbox Reliability Collaborative (GRC) Description and Loading  

SciTech Connect (OSTI)

This document describes simulated turbine load cases in accordance to the IEC 61400-1 Ed.3 standard, which is representative of the typical wind turbine design process. The information presented herein is intended to provide a broad understanding of the gearbox reliability collaborative 750kW drivetrain and turbine configuration. In addition, fatigue and ultimate strength drivetrain loads resulting from simulations are presented. This information provides the bases for the analytical work of the gearbox reliability collaborative effort.

Oyague, F.

2011-11-01T23:59:59.000Z

395

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project  

SciTech Connect (OSTI)

This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands.

Woodford, D.

2011-02-01T23:59:59.000Z

396

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York)  

Broader source: Energy.gov [DOE]

Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and...

397

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

SciTech Connect (OSTI)

This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

Woodford, D.

2011-02-01T23:59:59.000Z

398

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

of incremental wind development. At the extreme, still otherextreme assumption, the implied unit cost of transmission for windon wind power in their analysis. On one extreme, a number of

Mills, Andrew D.

2009-01-01T23:59:59.000Z

399

Harmonic approaches to non-intrusive load diagnostics  

E-Print Network [OSTI]

The Non-Intrusive Load Monitor (NILM) is a system that monitors, records and processes voltage and current measurements to establish the operating characteristics of individual loads on a load center from a single aggregate ...

Fuller, Ashley E. (Ashley Eliot)

2008-01-01T23:59:59.000Z

400

Psychosocial mediators of ethnic disparities in Allostatic Load /  

E-Print Network [OSTI]

in Allostatic Load A dissertation submitted in partialPartial Associations between Posited Mediators with Ethnicity and Allostatic Load……………………………………………………………………………………Partial Associations between Posited Mediators with Ethnicity and Allostatic Load

Tomfohr, Lianne Marie

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

axial compressive load: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

as the electromagnetic and thermal contraction loads are large but also for the heat load from the AC coupling loss. Reduction of the transverse load and warm-up cool-down...

402

axial compressive loading: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

as the electromagnetic and thermal contraction loads are large but also for the heat load from the AC coupling loss. Reduction of the transverse load and warm-up cool-down...

403

General solutions for thermopiezoelectrics with various holes under thermal loading  

E-Print Network [OSTI]

induced by thermal loads. The loads may be uniform remote heat ÂŻow, point heat source and temperature elastic plate with an hole of various shapes subjected to remote uniform mechanical loading. For plane

Qin, Qinghua

404

PO. 254 Control of Power Train Loads  

E-Print Network [OSTI]

Abstract summary Variable loads along the power train are the primary cause attributed to the failure of gears, bearings, and other mechanical components. The concept of anticipatory control applied to a wind power train is presented. This new approach to power train load management is based on the data reflecting the current status of the power train. The model driving the optimization of the power train loads considers four different objectives, including minimization of the torque variability and power maximization. A software tool for power train load management is presented. This new approach to power train load control is based on the data reflecting the current status of the power train. Such data is collected by a typical SCADA system. The model driving the optimization of the power train loads considers four different objectives, including minimization of the torque variability and power maximization. Details of the model that is applicable to different turbines are presented Objectives Goal: Transform a wind a farm into a wind power plant Example objectives: ? Minimization of the torque ramp rate ? Maximization of the power produced ? Maximization of the power quality Modify the shape of the power curve Methods Data mining/Knowledge discovery

Andrew Kusiak

405

Probabilistic Approach to Quantifying the Contribution of Variable Generation and Transmission to System Reliability: Preprint  

SciTech Connect (OSTI)

The increasing electrical load served by variable generation (VG), such as wind and solar energy, in the United States and many other countries has stimulated an interesting line of research to better quantify the capacity value of these resources. Methods applied traditionally to thermal units based on their average outage rates do not apply to VG because of their uncertain and non-dispatchable nature. The North American Electric Reliability Corporation's Integration of Variable Generation Task Force recently released a report that highlighted the need to develop and benchmark underlying loss-of-load expectation and related metrics that reasonably and fairly calculate the contribution to planning reserves, or capacity value, of solar and wind power. As the fraction of generation coming from VG becomes more significant, their estimated capacity value will have a larger impact on system planning. In this paper, we provide a method to include VG in traditional probabilistic-based adequacy methods. This method has been implemented in the Renewable Energy Probabilistic Resource Assessment tool developed at the National Renewable Energy Laboratory. Through an example based on the U.S. Western Interconnection, this method is applied to assess the effect that transmission can have on resource adequacy. We also analyze the interactions between available transmission and capacity value for VG.

Ibanez, E.; Milligan, M.

2012-09-01T23:59:59.000Z

406

1999 Pacific Northwest Loads and Resources Study.  

SciTech Connect (OSTI)

The Pacific Northwest Loads and Resources Study (White Book) is published annually by BPA and establishes the planning basis for supplying electricity to customers. It serves a dual purpose. First, the White Book presents projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. Second, the White Book serves as a benchmark for annual BPA determinations made pursuant to its regional power sales contracts. Specifically, BPA uses the information in the White Book for determining the notice required when customers request to increase or decrease the amount of power purchased from BPA. The White Book will not be used in calculations for the 2002 regional power sales contract subscription process. The White Book compiles information obtained from several formalized resource planning reports and data submittals, including those from the Northwest Power Planning Council (Council) and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions, including expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. In this loads and resources study, resource availability is compared with a medium forecast of electricity consumption. The forecasted future electricity demands--firm loads--are subtracted from the projected capability of existing and ''contracted for'' resources to determine whether BPA and the region will be surplus or deficit. If Federal system resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA may use or market to increase revenues. Conversely, if Federal system firm loads exceed available resources, there is a deficit of energy and/or capacity and BPA would add conservation or contract purchases as needed to meet its firm loads. The load forecast is derived by using econometric models and analysis to predict the loads that will be placed on electric utilities in the region. This study incorporates information on contract obligations and contract resources, combined with the resource capabilities obtained from public utility and investor-owned utility (IOU) customers through their annual data submittals to the PNUCC, from BPA's Firm Resource Exhibit (FRE Exhibit I) submittals, and through analysis of the Federal hydroelectric power system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. The PNCA defines the planning and operation of the regional hydrosystem. The 1999 White Book is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; and (2) a technical appendix (available electronically only) detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the December 1998 Pacific Northwest Loads and Resources Study. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 2000-01 through 2009-10. The study shows the Federal system's and the region's monthly estimated maximum electricity demand, monthly energy demand, monthly energy generation, and monthly maximum generating capability--capacity--for OY 2000-01, 2004-05, and 2009-10. The Federal system and regional monthly capacity surplus/deficit projections are summarized for 10 operating years. This document analyzes the Pacific Northwest's projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for wh

United States. Bonneville Power Administration.

1999-12-01T23:59:59.000Z

407

Y-12 Finishes Initial HEUMF Loading Ahead of Schedule | National...  

National Nuclear Security Administration (NNSA)

Home Field Offices Welcome to the NNSA Production Office NPO News Releases Y-12 Finishes Initial HEUMF Loading Ahead of Schedule Y-12 Finishes Initial HEUMF Loading...

408

acute acid loading an: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 queries Meagher, Mary 29 An Automatic Load Sharing Approach for a DFIG Based Wind Generator in a Microgrid Engineering Websites Summary: An Automatic Load Sharing Approach...

409

Characterization of Dynamic Loads on Solar Modules with Respect...  

Broader source: Energy.gov (indexed) [DOE]

Characterization of Dynamic Loads on Solar Modules with Respect to Fracture of Solar Cells Characterization of Dynamic Loads on Solar Modules with Respect to Fracture of Solar...

410

Effect of Compression Ratio and Piston Geometry on RCCI load...  

Broader source: Energy.gov (indexed) [DOE]

Compression Ratio and Piston Geometry on RCCI load limit Effect of Compression Ratio and Piston Geometry on RCCI load limit Explores the effect of compression ratio and piston...

411

Development of an Accelerated Ash-Loading Protocol for Diesel...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

an Accelerated Ash-Loading Protocol for Diesel Particulate Filters Development of an Accelerated Ash-Loading Protocol for Diesel Particulate Filters Poster presentation at the 2007...

412

The Development of a Small Engine Based Accelerated Ash Loading...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Accelerated Ash Loading Protocol The Development of a Small Engine Based Accelerated Ash Loading Protocol Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan....

413

Local Soot Loading Distribution in Cordierite Diesel Particulate...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Local Soot Loading Distribution in Cordierite Diesel Particulate Filters by Dynamic Neutron Radiography Local Soot Loading Distribution in Cordierite Diesel Particulate Filters by...

414

Load controller and method to enhance effective capacity of a photovoltaic power supply using a dynamically determined expected peak loading  

DOE Patents [OSTI]

A load controller and method are provided for maximizing effective capacity of a non-controllable, renewable power supply coupled to a variable electrical load also coupled to a conventional power grid. Effective capacity is enhanced by monitoring power output of the renewable supply and loading, and comparing the loading against the power output and a load adjustment threshold determined from an expected peak loading. A value for a load adjustment parameter is calculated by subtracting the renewable supply output and the load adjustment parameter from the current load. This value is then employed to control the variable load in an amount proportional to the value of the load control parameter when the parameter is within a predefined range. By so controlling the load, the effective capacity of the non-controllable, renewable power supply is increased without any attempt at operational feedback control of the renewable supply.

Perez, Richard

2005-05-03T23:59:59.000Z

415

Dispersion-free radial transmission lines  

DOE Patents [OSTI]

A dispersion-free radial transmission line ("DFRTL") preferably for linear accelerators, having two plane conductors each with a central hole, and an electromagnetically permeable material ("EPM") between the two conductors and surrounding a channel connecting the two holes. At least one of the material parameters of relative magnetic permeability, relative dielectric permittivity, and axial width of the EPM is varied as a function of radius, so that the characteristic impedance of the DFRTL is held substantially constant, and pulse transmission therethrough is substantially dispersion-free. Preferably, the EPM is divided into concentric radial sections, with the varied material parameters held constant in each respective section but stepwise varied between sections as a step function of the radius. The radial widths of the concentric sections are selected so that pulse traversal time across each section is the same, and the varied material parameters of the concentric sections are selected to minimize traversal error.

Caporaso, George J. (Livermore, CA); Nelson, Scott D. (Patterson, CA)

2011-04-12T23:59:59.000Z

416

127 Natural Gas Transmission and Distribution Module  

E-Print Network [OSTI]

and border prices, end-use prices, and flows of natural gas through a regional interstate representative pipeline network, for both a peak (December through March) and off-peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of the supply options available to bring gas to market centers within each of the NGTDM regions (Figure 9). The major assumptions used within the NGTDM are grouped into four general categories. They relate to (1) structural components of the model, (2) capacity expansion and pricing of transmission and distribution services, (3) Arctic pipelines, and (4) imports and exports. A complete listing of NGTDM assumptions and in-depth

Key Assumptions

417

Acoustic data transmission through a drillstring  

DOE Patents [OSTI]

A method and apparatus for acoustically transmitting data along a drillstring is presented. In accordance with one embodiment of the present invention, acoustic data signals are conditioned to counteract distortions caused by the drillstring. Preferably, this conditioning step comprises multiplying each frequency component of the data signal by exp (-ikL) where L is the transmission length of the drillstring, k is the wave number in the drillstring at the frequency of each component and i is (-1).sup.1/2. In another embodiment of this invention, data signals having a frequency content in at least one passband of the drillstring are generated preferably traveling in only one direction (e.g., up the drillstring) while echoes in the drillstring resulting from the data transmission are suppressed.

Drumheller, Douglas S. (Cedar Crest, NM)

1992-01-01T23:59:59.000Z

418

Acoustic data transmission through a drillstring  

DOE Patents [OSTI]

A method and apparatus for acoustically transmitting data along a drillstring are presented. In accordance with one embodiment of the present invention, acoustic data signals are conditioned to counteract distortions caused by the drillstring. Preferably, this conditioning step comprises multiplying each frequency component of the data signal by exp ([minus]ikL) where L is the transmission length of the drillstring, k is the wave number in the drillstring at the frequency of each component and i is ([minus]1)[sup 1/2]. In another embodiment of this invention, data signals having a frequency content in at least one passband of the drillstring are generated preferably traveling in only one direction (e.g., up the drillstring) while echoes in the drillstring resulting from the data transmission are suppressed. 20 figs.

Drumheller, D.S.

1992-07-07T23:59:59.000Z

419

Idaho/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:GreerHiCalifornia:ISI Solar JumpObtainTransmission/Agency

420

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:GreerHiCalifornia:ISI Solar JumpObtainTransmission/AgencyState'sIdaho,

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Forced cooling of underground electric power transmission lines : design manual  

E-Print Network [OSTI]

The methodology utilized for the design of a forced-cooled pipe-type underground transmission system is presented. The material is divided into three major parts: (1) The Forced-cooled Pipe-Type Underground Transmission ...

Brown, Jay A.

1978-01-01T23:59:59.000Z

422

An improved speech transmission index for intelligibility prediction Belinda Schwerin  

E-Print Network [OSTI]

transmission index; Modulation transfer function; Speech enhancement; Objective evaluation; Speech intelligibility; Short-time modulation spectrum 1. Introduction The enhancement of speech corrupted by noise hasAn improved speech transmission index for intelligibility prediction Belinda Schwerin , Kuldip

423

20% Wind Energy by 2030 - Chapter 4: Transmission and Integration...  

Broader source: Energy.gov (indexed) [DOE]

4: Transmission and Integration into the U.S. Electric System Summary Slides 20% Wind Energy by 2030 - Chapter 4: Transmission and Integration into the U.S. Electric System Summary...

424

Mode conversation losses in overmolded millimeter wave transmission lines  

E-Print Network [OSTI]

Millimeter wave transmission lines are integral components for many important applications like nuclear fusion and NMR spectroscopy. In low loss corrugated transmission lines propagating the HE,1 mode with a high waveguide ...

Tax, David S. (David Samuel)

2008-01-01T23:59:59.000Z

425

EIS-0421: Big Eddy-Knight Transmission Line  

Broader source: Energy.gov [DOE]

BPA is proposing to build a new 500 kilovolt (kV) transmission line in Wasco County, Oregon and Klickitat County, Washington and a new substation in Klickitat County. The new BPA transmission line...

426

Biennial Assessment of the Fifth Power Plan Transmission Issues  

E-Print Network [OSTI]

unscheduled electricity flows over transmission lines leading to increased risks to electric system by the partners in the Colstrip 500 kV transmission lines (Northwestern Energy, Puget Sound Energy, Portland

427

Statistical Image Reconstruction Algorithms Using Paraboloidal Surrogates for PET Transmission  

E-Print Network [OSTI]

Statistical Image Reconstruction Algorithms Using Paraboloidal Surrogates for PET Transmission Reconstruction Algorithms Using Paraboloidal Surrogates for PET Transmission Scans by Hakan Erdogan Chair: Jeffrey A. Fessler Positron Emission Tomography (PET) is a diagnostic imaging tool that provides images

Fessler, Jeffrey A.

428

Aggregate Model for Heterogeneous Thermostatically Controlled Loads with Demand Response  

SciTech Connect (OSTI)

Due to the potentially large number of Distributed Energy Resources (DERs) – demand response, distributed generation, distributed storage - that are expected to be deployed, it is impractical to use detailed models of these resources when integrated with the transmission system. Being able to accurately estimate the fast transients caused by demand response is especially important to analyze the stability of the system under different demand response strategies. On the other hand, a less complex model is more amenable to design feedback control strategies for the population of devices to provide ancillary services. The main contribution of this paper is to develop aggregated models for a heterogeneous population of Thermostatic Controlled Loads (TCLs) to accurately capture their collective behavior under demand response and other time varying effects of the system. The aggregated model efficiently includes statistical information of the population and accounts for a second order effect necessary to accurately capture the collective dynamic behavior. The developed aggregated models are validated against simulations of thousands of detailed building models using GridLAB-D (an open source distribution simulation software) under both steady state and severe dynamic conditions caused due to temperature set point changes.

Zhang, Wei; Kalsi, Karanjit; Fuller, Jason C.; Elizondo, Marcelo A.; Chassin, David P.

2012-07-22T23:59:59.000Z

429

Wind Integration, Transmission, and Resource Assessment andCharacteri...  

Energy Savers [EERE]

& Publications Wind Integration, Transmission, and Resource Assessment and Characterization Projects Offshore Wind Projects Testing, Manufacturing, and Component Development...

430

Transmission Project Reporting FPA 216h | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Disturbance Events Incident Reporting Emergency Situation Reports Energy Assurance Daily Transmission Project Reporting Library New Reports & Other Materials Meetings & Events...

431

2006 Pacific Northwest Loads and Resources Study.  

SciTech Connect (OSTI)

The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues, although the database that generates the data for the White Book analysis contributes to the development of BPA's inventory and ratemaking processes. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions that include expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. The load resource balance of both the Federal system and the region is determined by comparing resource availability to an expected level of total retail electricity consumption. Resources include projected energy capability plus contract purchases. Loads include a forecast of retail obligations plus contract obligations. Surplus energy is available when resources are greater than loads. This surplus energy could be marketed to increase revenues. Energy deficits occur when resources are less than loads. These energy deficits will be met by any combination of the following: better-than-critical water conditions, demand-side management and conservation programs, permanent loss of loads due to economic conditions or closures, additional contract purchases, and/or the addition of new generating resources. This study incorporates information on Pacific Northwest (PNW) regional retail loads, contract obligations, and contract resources. This loads and resources analysis simulates the operation of the power system in the PNW. The simulated hydro operation incorporates plant characteristics, streamflows, and non-power requirements from the current Pacific Northwest Coordination Agreement (PNCA). Additional resource capability estimates were provided by BPA, PNW Federal agency, public agency, cooperative, U.S. Bureau of Reclamation (USBR), and investor-owned utility (IOU) customers furnished through annual PNUCC data submittals for 2005 and/or direct submittals to BPA. The 2006 White Book is presented in two documents: (1) this summary document of Federal system and PNW region loads and resources, and (2) a technical appendix which presents regional loads, grouped by major PNW utility categories, and detailed contract and resource information. The technical appendix is available only in electronic form. Individual customer information for marketer contracts is not detailed due to confidentiality agreements. The 2006 White Book analysis updates the 2004 White Book. This analysis shows projections of the Federal system and region's yearly average annual energy consumption and resource availability for the study period, OY 2007-2016. The study also presents projections of Federal system and region expected 1-hour monthly peak demand, monthly energy demand, monthly 1-hour peak generating capability, and monthly energy generation for OY 2007, 2011, and 2016. BPA is investigating a new approach in capacity planning depicting the monthly Federal system 120-hour peak generating capability and 120-hour peak surplus/deficit for OY 2007, 2011, and 2016. This document analyzes the PNW's projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency;

United States. Bonneville Power Administration.

2006-03-01T23:59:59.000Z

432

On-line Load Balancing for Related Machines 1 Piotr Berman  

E-Print Network [OSTI]

s and Load(s), the load of entire schedule s as follows: load(s;i) = 1 vi X s(j)=i pj; Load(s) = maxi loadOn-line Load Balancing for Related Machines 1 (Revised Version) Piotr Berman The Pennsylvania State for this problem. Key Words: on-line algorithm, load balancing, related machines, competitive ratio 1A preliminary

Eckmiller, Rolf

433

Structural Optimization of High Voltage Transmission Line Towers considering  

E-Print Network [OSTI]

Structural Optimization of High Voltage Transmission Line Towers considering Continuum and Discrete/or to common designs largely repeated (e.g. automotive compo- nents), and high voltage transmission towers can than conventional designs of high voltage transmission line towers. The optimization model proposed

Colominas, Ignasi

434

Free Vibrations of Coupled Spans of Overhead Transmission Lines  

E-Print Network [OSTI]

damage to the cables. Figure 1: Overhead transmission lines. Spans are suspended between towers fromFree Vibrations of Coupled Spans of Overhead Transmission Lines Sjoerd W. Rienstra Department transmission lines is studied. It is shown that the natural vibration is the gravity mode, which is free from

Eindhoven, Technische Universiteit

435

Classification of the Visual Landscape for Transmission Planning1  

E-Print Network [OSTI]

. The third concept is that the specific design of transmission towers can result in a negative re- sponseClassification of the Visual Landscape for Transmission Planning1 Curtis Miller2/ , Nargis Jetha3 can be made of the visual change to the landscape due to the introduction of transmission facilities

Standiford, Richard B.

436

Transmission Pricing and Congestion Management: Efficiency, Simplicity and Open Access  

E-Print Network [OSTI]

Transmission Pricing and Congestion Management: Efficiency, Simplicity and Open Access Shmuel S-1403 Email OREN@IEOR.Berkeley.edu Abstract Transmission pricing and congestion management are the key the objectives of a transmission pricing and congestion management scheme. I contrast two extreme approaches

Oren, Shmuel S.

437

Application of High-Angle Annular Dark Field Scanning Transmission  

E-Print Network [OSTI]

Transmission Electron Microscopy-Energy Dispersive X-ray Spectrometry, and Energy-Filtered Transmission field scanning transmission electron microscopy (HAADF-STEM), STEM-energy-dispersive X-ray spectrometry). Techniquesthatareusefulinanalyzingultrafineatmospheric particles, such as STEM, EELS (electron energy loss spec- trometry), AFM, and mass spectrometry

Utsunomiya, Satoshi

438

Electricity generation with looped transmission networks: Bidding to an ISO  

E-Print Network [OSTI]

on a transmission network from net generation nodes to net consumption nodes is governed by the Kirchoff Laws [45Electricity generation with looped transmission networks: Bidding to an ISO Xinmin Hu Daniel Ralph to model markets for delivery of electrical power on looped transmission networks. It analyzes

Ferris, Michael C.

439

EIS-0390: Eastern Plains Transmission Project, Colorado and Kansas.  

Broader source: Energy.gov [DOE]

This EIS is for Western Area Power Administration's proposal to participate with Tri-State Generation and Transmission Association, Inc. (Tri-State), to construct the proposed Eastern Plains Transmission Project (Project). Western’s participation with Tri-State would be in exchange for capacity rights on the transmission lines.

440

TRANSMISSION ELECTRON MICROSCOPY OF WEAKLY DEFORMED ALKALI HALIDE CRYSTALS  

E-Print Network [OSTI]

377 TRANSMISSION ELECTRON MICROSCOPY OF WEAKLY DEFORMED ALKALI HALIDE CRYSTALS H. STRUNK Max'importance croissante du durcissement de la solution solide. Abstract. 2014 Transmission electron microscopy (TEM Abstracts 7j66 - 7 I' 1. Introduction. - It is only some years ago that transmission electron microscopy

Boyer, Edmond

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Queue Prediction: an efficient scheduler for fast ATM cell transmission  

E-Print Network [OSTI]

Queue Prediction: an efficient scheduler for fast ATM cell transmission Peter Fenwick Department, if not impossible within the time constraints of fast ATM transmission (622 Mbps or higher). This paper presents a solution to this problem. By scheduling in advance the transmissions from queues it allows all output

Fenwick, Peter

442

Reference: RGL 83-09 Subject: POWER TRANSMISSION LINES  

E-Print Network [OSTI]

Reference: RGL 83-09 Subject: POWER TRANSMISSION LINES Title: MARKING OF AERIAL POWER TRANSMISSION. 1. The marking of aerial power transmission lines, cables, and structures over the navigable waters LINES, CABLES, & STRUCTURES Issued: 07/13/83 Expires: 12/31/85 Originator: DAEN-CWO-N Description: ARMY

US Army Corps of Engineers

443

Using Transmission Lines for Global On-Chip Communication  

E-Print Network [OSTI]

1 Using Transmission Lines for Global On-Chip Communication Aaron Carpenter, Jianyun Hu, Jie Xu-switched network-on-chip a less attractive option. An alternative solution uses well-engineered transmission lines as communication links. These transmission lines, along with simple, practical circuits using modern CMOS technol

Huang, Michael C.

444

Asymmetric parametric amplification in nonlinear left-handed transmission lines  

E-Print Network [OSTI]

Asymmetric parametric amplification in nonlinear left-handed transmission lines David A. Powell amplification in nonlinear left-handed transmission lines, which serve as model systems for nonlinear negative-handed regime. © 2009 American Institute of Physics. DOI: 10.1063/1.3089842 Left-handed transmission lines

445

Nonlinear Free Vibrations of Coupled Spans of Overhead Transmission Lines  

E-Print Network [OSTI]

Nonlinear Free Vibrations of Coupled Spans of Overhead Transmission Lines Sjoerd W. Rienstra transmission lines is studied. It is shown that the natural vibration is the gravity mode, of which of the phenomenon of galloping, which is a high amplitude periodic oscillation of overhead transmission lines due

Rienstra, Sjoerd W.

446

Multifrequency Wilkinson Power Divider Using Microstrip Nonuniform Transmission Lines  

E-Print Network [OSTI]

Multifrequency Wilkinson Power Divider Using Microstrip Nonuniform Transmission Lines Mohammad desired frequencies. The proposed structure contains two Microstrip Nonuniform Transmission Lines (MNTLs­6] and using composite right/left-handed transmission line (CRLH) [7]. The main disadvantage of multistage

Paris-Sud XI, Université de

447

Dielectric breakdown model for conductor-loaded and insulator-loaded composite materials P. Bergero,1  

E-Print Network [OSTI]

Dielectric breakdown model for conductor-loaded and insulator-loaded composite materials P. Bergero strength is highly desirable, and in the past years composite materials such as resin matrix filled- tors, and composites containing carbon black and titanium dioxide have recently been tested

Peruani, Fernando

448

Reconstruction of a wind turbine's endured load spectrum using a short-time load measurement  

E-Print Network [OSTI]

Reconstruction of a wind turbine's endured load spectrum using a short-time load measurement Abstract Wind turbines (WT) are normally designed for a service life (SL) of 20 years. In Germany, over safety. 1 Introduction A wind turbine (WT) is normally designed, tested and certified for a design life

Berlin,Technische Universität

449

Improved Load Distribution for Load Rating of Low-Fill Box Structures  

E-Print Network [OSTI]

. The distribution of live loads on the top slab of a box culvert plays a major role in determining the rating factor of the culvert. The current AASHTO guidelines do not consider the effects of pavements present above the fill while determining the load distribution...

Acharya, Raju

2012-12-31T23:59:59.000Z

450

Modality Effects on Cognitive Load and Performance in High-Load Information Presentation  

E-Print Network [OSTI]

INTRODUCTION Intelligent human-computer interfaces are often multimodal, i.e. the human-computer communications into the modality planning procedure for systems that support high-load human-computer interaction. Author Keywords-load information presenta- tion scenario. Mainly based on modality-related psychology theories, we selected five

Nijholt, Anton

451

Independent review of estimated load reductions for PJM's small customer load response pilot project  

E-Print Network [OSTI]

water heater (EWH) load control program operated as part of PJM Interconnection’s Demand ResponseDemand Response Economic and Emergency Load Response Programs Electric Thermal Storage Electric Water Heaterwater pumps and electric thermal storage space heaters. The CSP is also participating in PJM’s pilot Demand Response

Heffner, G.; Moezzi, M.; Goldman, C.

2004-01-01T23:59:59.000Z

452

CALIFORNIA'S NEXT GENERATION OF LOAD MANAGEMENT STANDARDS  

E-Print Network [OSTI]

eliminate the need for new peaking generation capacity and associated transmission and distribution capacity. By reducing capacity, generation and infrastructure costs, it can lower total power costs and customer bills wholesale power spot markets more competitive and efficient and less subject to the abuse of market power

453

CALIFORNIA'S NEXT GENERATION OF LOAD MANAGEMENT STANDARDS  

E-Print Network [OSTI]

the need for new peaking generation capacity and associated transmission and distribution capacity. By reducing capacity, generation and infrastructure costs, it can lower total power costs and customer bills wholesale power spot markets more competitive and efficient and less subject to the abuse of market power

454

Capturing the cloud of MRSA diversity after transmission and during infection 2 reveals complex and heterogenous carriage and transmission  

E-Print Network [OSTI]

1 Capturing the cloud of MRSA diversity after transmission and during infection 1 reveals complex and heterogenous carriage and transmission 2 3 Running title: MRSA tracking and the cloud of diversity 4 5 Gavin K. Paterson 1#¶, Ewan M... transmission event. To 55 further understand the cloud of diversity that exists within colonized individuals and 56 5 during transmission, we undertook deep sequencing of a methicillin-resistant S. aureus 57 (MRSA) ‘outbreak’ at a veterinary hospital...

Paterson, Gavin K.; Harrison, Ewan M.; Murray, Gemma G.R.; Welch, John J.; Warland, James H.; Holden, Matthew T.G.; Morgan, Fiona J.E.; Ba, Xiaoliang; Koop, Gerrit; Harris, Simon R.; Maskell, Duncan J.; Peacock, Sharon J.; Herrtage, Michael E.; Parkhill, Julian; Holmes, Mark A.

2015-01-01T23:59:59.000Z

455

Load attenuating passively adaptive wind turbine blade  

DOE Patents [OSTI]

A method and apparatus for improving wind turbine performance by alleviating loads and controlling the rotor. The invention employs the use of a passively adaptive blade that senses the wind velocity or rotational speed, and accordingly modifies its aerodynamic configuration. The invention exploits the load mitigation prospects of a blade that twists toward feather as it bends. The invention includes passively adaptive wind turbine rotors or blades with currently preferred power control features. The apparatus is a composite fiber horizontal axis wind-turbine blade, in which a substantial majority of fibers in the blade skin are inclined at angles of between 15 and 30 degrees to the axis of the blade, to produces passive adaptive aeroelastic tailoring (bend-twist coupling) to alleviate loading without unduly jeopardizing performance.

Veers, Paul S. (Albuquerque, NM); Lobitz, Donald W. (Albuquerque, NM)

2003-01-01T23:59:59.000Z

456

MEASUREMENT OF WASTE LOADING IN SALTSTONE  

SciTech Connect (OSTI)

One of the goals of the Saltstone variability study is to identify the operational and compositional variables that control or influence the important processing and performance properties of Saltstone grout mixtures. One of those properties of importance is the Waste Loading (WL) of the decontaminated salt solution (DSS) in the Saltstone waste form. Waste loading is a measure of the amount of waste that can be incorporated within a waste form. The value of the Saltstone waste loading ultimately determines the number of vaults that will be required to disposition all of the DSS. In this report, the waste loading is defined as the volume in milliliters of DSS per liter of Saltstone waste form. The two most important parameters that determine waste loading for Saltstone are water to cementitious material (w/cm) ratio and the cured grout density. Data are provided that show the dependence of waste loading on the w/cm ratio for a fixed DSS composition using the current premix material (45% Blast Furnace Slag (BFS), 45% Fly Ash (FA) and 10% Ordinary Portland Cement (OPC)). The impact of cured grout density on waste loading was also demonstrated. Mixes (at 0.60 w/cm) made with a Modular Caustic side extraction Unit (MCU) simulant and either OPC or BFS have higher cured grout densities than mixes made with premix and increase the WL to 709 mL/L for the OPC mix and 689 mL/L for the BFS mix versus the value of 653 mL/L for MCU in premix at 0.60 w/cm ratio. Bleed liquid reduces the waste loading and lowers the effective w/cm ratio of Saltstone. A method is presented (and will be used in future tasks) for correcting the waste loading and the w/cm ratio of the as-batched mixes in those cases where bleed liquid is present. For example, the Deliquification, Dissolution and Adjustment (DDA) mix at an as-batched 0.60 w/cm ratio, when corrected for % bleed, gives a mix with a 0.55 w/cm ratio and a WL that has been reduced from 662 to 625 mL/L. An example is provided that demonstrated the quantitative impact of WL on the number of cells (each Saltstone vault contains two cells) required to disposition all of the {approx}100 million gallons of DSS available in the tanks. This calculation revealed that the number of cells required over the range of 0.48 to 0.62 w/cm ratio (equivalent to a WL range of 591 to 666 mL/L) varies from 65 to 57 cells (33 to 29 vaults). The intent of this oversimplified example was to show the range of variation in vaults expected due to w/cm ratio rather than to estimate the actual number of vaults required. There is a tradeoff between the waste loading and the processing and performance properties of Saltstone. The performance properties improve in general as the w/cm ratio decreases whereas the waste loading is reduced at lower w/cm ratios resulting in a larger number of Saltstone vaults. The final performance and processing requirements of Saltstone will determine the maximum waste loading achievable.

Harbour, J; Vickie Williams, V

2008-07-18T23:59:59.000Z

457

Load attenuating passively adaptive wind turbine blade  

DOE Patents [OSTI]

A method and apparatus for improving wind turbine performance by alleviating loads and controlling the rotor. The invention employs the use of a passively adaptive blade that senses the wind velocity or rotational speed, and accordingly modifies its aerodynamic configuration. The invention exploits the load mitigation prospects of a blade that twists toward feather as it bends. The invention includes passively adaptive wind turbine rotors or blades with currently preferred power control features. The apparatus is a composite fiber horizontal axis wind-turbine blade, in which a substantial majority of fibers in the blade skin are inclined at angles of between 15 and 30 degrees to the axis of the blade, to produces passive adaptive aeroelastic tailoring (bend-twist coupling) to alleviate loading without unduly jeopardizing performance.

Veers, Paul S.; Lobitz, Donald W.

2003-01-07T23:59:59.000Z

458

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(Utility Company) Jump to: navigation, searchOhio:MO)Land Office Jumpwebpage

459

Gateway West Transmission Line | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation, search Equivalent6894093° Loading69.County, North Carolina:GatewayWest

460

IN-SERVICE LOAD & RESISTANCE FACTOR RATING METHOD FOR BRIDGES  

E-Print Network [OSTI]

Stress Rating method (noted ASR in the following), Load Factor Rating method (noted LFR in the followingIN-SERVICE LOAD & RESISTANCE FACTOR RATING METHOD FOR BRIDGES Degang Li1 , Baidurya Bhattacharya2 are evaluated using allowable stress and load factor rating methods. Load rating made in these traditional

Bhattacharya, Baidurya

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Randomized Load Balancing by Joining and Splitting Bins James Aspnes  

E-Print Network [OSTI]

Consider the following load balancing scenario: a certain amount of work load is distributed among a setRandomized Load Balancing by Joining and Splitting Bins James Aspnes Yitong Yin § 1 Introduction, one of the existing machines gives some of its load to the new machine; and upon a departure

Aspnes, James

462

Classification and forecasting of load curves Nolwen Huet  

E-Print Network [OSTI]

Classification and forecasting of load curves Nolwen Huet Abstract The load curve, which gives of electricity customer uses. This load curve is only available for customers with automated meter reading. For the others, EDF must estimate this curve. Usually a clustering of the load curves is performed, followed

Cuesta, Juan Antonio

463

Discharge indices for water quality loads Richard M. Vogel  

E-Print Network [OSTI]

: effective discharge, transport, sediment, constituents, rating curve, half-load Citation: Vogel, R. M., J. RDischarge indices for water quality loads Richard M. Vogel Department of Civil and Environmental load is ultimately the quantity of interest, we define a new index, the half-load discharge, which

Vogel, Richard M.

464

ANALYTICAL APPROACH TO TRANSIENT HEAT CONDUCTION IN COOLING LOAD CALCULATIONS  

E-Print Network [OSTI]

equation in cooling load calculations. The performance of nine different procedures (the four methods and

Michal Duška; Martin Barták; František Drkal; Jan Hensen

465

Demand-Side Response from Industrial Loads  

SciTech Connect (OSTI)

Through a research study funded by the Department of Energy, Smart Grid solutions company ENBALA Power Networks along with the Oak Ridge National Laboratory (ORNL) have geospatially quantified the potential flexibility within industrial loads to leverage their inherent process storage to help support the management of the electricity grid. The study found that there is an excess of 12 GW of demand-side load flexibility available in a select list of top industrial facilities in the United States. Future studies will expand on this quantity of flexibility as more in-depth analysis of different industries is conducted and demonstrations are completed.

Starke, Michael R [ORNL; Alkadi, Nasr E [ORNL; Letto, Daryl [Enbala Power Networks; Johnson, Brandon [University of Tennessee, Knoxville (UTK); Dowling, Kevin [University of Tennessee, Knoxville (UTK); George, Raoule [Enbala Power Networks; Khan, Saqib [University of Texas, Austin

2013-01-01T23:59:59.000Z

466

Taking a Bite out of Lighting Loads  

E-Print Network [OSTI]

Take a Bite Out of Lighting Loads With LEDs Stephen Williams Toshiba Sales Support Manager ESL-KT-13-12-34 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Some LED Advantages • Less electricity ? 18w LED... = 100w PAR38 • No maintenance for years ? 50,000 LED vs.10,000 CFL • Improved light quality ? 80 CRI LED vs. 25 CRI HPS • Reduce HVAC cooling load • Advanced control options ESL-KT-13-12-34 CATEE 2013: Clean Air Through Energy Efficiency Conference, San...

Williams, S.

2013-01-01T23:59:59.000Z

467

Power Transmission From The ITER Model Negative Ion Source  

SciTech Connect (OSTI)

In Cadarache development on negative ion sources is being carried out on the KAMABOKO III ion source on the MANTIS test bed. This is a model of the ion source designed for the neutral beam injectors of ITER. This ion source has been developed in collaboration with JAERI, Japan, who also designed and supplied the ion source. Its target performance is to accelerate a D- beam, with a current density of 200 A/m2 and <1 electron extracted per accelerated D- ion, at a source filling pressure of 0.3 Pa. For ITER a continuous ion beam must be assured for pulse lengths of 1000 s, but beams of up to 3,600 s are also envisaged. The ion source is attached to a 3 grid 30 keV accelerator (also supplied by JAERI) and the accelerated negative ion current is determined from the energy deposited on a calorimeter. During long pulse operation ({<=}1000 s) it was found that the current density of both D- and H- beams, measured at the calorimeter was lower than expected and that a large discrepancy existed between the accelerated currents measured electrically and those transmitted to the calorimeter. The possibility that this discrepancy arose because the accelerated current included electrons (which would not be able to reach the calorimeter) was investigated and subsequently eliminated. Further studies have shown that the fraction of the electrical current reaching the calorimeter varies with the pulse length, which led to the suggestion that one or more of the accelerator grids were distorting due to the incident power during operation, leading to a progressive deterioration in the beam quality.. New extraction and acceleration grids have been designed and installed, which should have a better tolerance to thermal loads than those previously used. This paper describes the measurements of the power transmission and distribution using these grids.

Boilson, D. [Association EURATOM-DCU, PRL/NCPST, Glasnevin, Dublin 13 (Ireland); Esch, H. P. L. de; Grand, C.; Hemsworth, R. S.; Krylov, A. [Association EURATOM-CEA, CEA/DSM/DRFC, CEA-Cadarache, 13108 St Paul-Lez-Durance (France)

2007-08-10T23:59:59.000Z

468

Ponderomotive phase plate for transmission electron microscopes  

DOE Patents [OSTI]

A ponderomotive phase plate system and method for controllably producing highly tunable phase contrast transfer functions in a transmission electron microscope (TEM) for high resolution and biological phase contrast imaging. The system and method includes a laser source and a beam transport system to produce a focused laser crossover as a phase plate, so that a ponderomotive potential of the focused laser crossover produces a scattering-angle-dependent phase shift in the electrons of the post-sample electron beam corresponding to a desired phase contrast transfer function.

Reed, Bryan W. (Livermore, CA)

2012-07-10T23:59:59.000Z

469

Utah/Transmission | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformation UC 19-6-401UpsonUtah State HistoricInformationTransmission

470

Transmission Access Resources | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for Transmission

471

Electricity Transmission, A Primer | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQ Contract ESPCElectrical Safety2011:2011:EnergyofTransmission,

472

Sandia National Laboratories: transmission grid integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1developmentturbineredox-activeNational SolartSSLPV materialsmethodstransmission

473

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd JumpGTZHolland, Illinois:5717551°Farms Ltd Jump to:Southline Transmission

474

Transmission/Resource Library | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,LtdInformation Dixie ValleyLibrary < Transmission Jump to:

475

A Note on Online Load Balancing for Related Machines  

E-Print Network [OSTI]

(j) that will execute it. We define the load of a machine i and the load of entire schedule s as follows: load(s; i) = 1A Note on On­line Load Balancing for Related Machines Piotr Berman \\Lambda Marek Karpinski y that differ in speed but are related in the following sence: a job of size p requires time p=v on a machine

Eckmiller, Rolf

476

Independent review of estimated load reductions for PJM's small customer load response pilot project  

SciTech Connect (OSTI)

This study describes the results of a low-cost approach used to measure reported load reductions from a residential electric water heater (EWH) load control program operated as part of PJM Interconnection's Demand Response small customer pilot program. Lawrence Berkeley National Laboratory (LBNL) conducted this independent review of the engineering estimates for EWH load control reported by a Curtailment Service Provider (CSP) at PJM's request. LBNL employed low-cost measurement and verification (M&V) approaches that utilized existing interval metering equipment to monitor results for a series of load control tests. The CSP collected hourly load data for two substations and several hundred households over a six-week period in October and November 2003. During this time period, the CSP operated its electric water heater load control program during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems signifiogram during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems significantly limit our ability to differentiate between control-related and non-control related differences in substation-level load shape data. The usefulness and accuracy of the results were hampered by operational problems encountered during the measurement period as well as in sufficient number of load research grade interval meters at one cooperative. Given the larger sample size at one electric cooperative and more statistically-robust results, there is some basis to suggest that the Adjusted Diversified Demand Factor (ADDF) values used by the CSP somewhat over-state the actual load reductions. Given the results and limitations of the M&V approach as implemented, we suggest several options for PJM to consider: (1) require load aggregators participating in ISODR programs to utilize formal PURPA-compliant load research samples in their M&V plans, and (2) continue developing lower cost M&V approaches for mass market load control programs that incorporate suggested improvements described in this study.

Heffner, G.; Moezzi, M.; Goldman, C.

2004-06-01T23:59:59.000Z

477

Analysis of the Load Impacts and Economic  

E-Print Network [OSTI]

of the Time of Use (TOU) rate plan, called "Analysis of the Load Impacts and Economic Benefits model. The TOU data was rerun through the new spreadsheet model and the results are reported here. · Participation in the TOU rate option also resulted in an average net reduction of 292 kWh/year in annual

478

Improving Electric Load Forecasts Using Network Committees  

E-Print Network [OSTI]

, King Fahd University of Petroleum and Minerals, Dhahran 31261, Saudi Arabia Address for corresponding author: Dr. R. E. Abdel-Aal P. O. Box 1759 KFUPM Dhahran 31261 Saudi Arabia e-mail: radwan load and weather data at power utilities has encouraged the use of data-based machine learning modeling

Abdel-Aal, Radwan E.

479

Fig. 1. Example System phase loads  

E-Print Network [OSTI]

power system (SPS) consists of various components such as generators, cables, switchboards, load centers Transformer 9 25 12 Alternate path Generator switchboard Bus-tie breaker Generator 1 Generator 3 Generator 2 4 26 G 29 7 8 ABT 3 single phase cables Visualization for Shipboard Power Systems Karen L. Butler

480

Load forecast and treatment of conservation  

E-Print Network [OSTI]

conservation is implicitly incorporated in the short-term demand forecast? #12;3 Incorporating conservationLoad forecast and treatment of conservation July 28th 2010 Resource Adequacy Technical Committee in the short-term model Our short-term model is an econometric model which can not explicitly forecast

Note: This page contains sample records for the topic "transmission loading relief" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Load responsive multilayer insulation performance testing  

SciTech Connect (OSTI)

Cryogenic insulation designed to operate at various pressures from one atmosphere to vacuum, with high thermal performance and light weight, is needed for cryogenically fueled space launch vehicles and aircraft. Multilayer insulation (MLI) performs well in a high vacuum, but the required vacuum shell for use in the atmosphere is heavy. Spray-on foam insulation (SOFI) is often used in these systems because of its light weight, but can have a higher heat flux than desired. We report on the continued development of Load Responsive Multilayer Insulation (LRMLI), an advanced thermal insulation system that uses dynamic beam discrete spacers that provide high thermal performance both in atmosphere and vacuum. LRMLI consists of layers of thermal radiation barriers separated and supported by micromolded polymer spacers. The spacers have low thermal conductance, and self-support a thin, lightweight vacuum shell that provides internal high vacuum in the insulation. The dynamic load responsive spacers compress to support the external load of a vacuum shell in one atmosphere, and decompress under reduced atmospheric pressure for lower heat leak. Structural load testing was performed on the spacers with various configurations. LRMLI was installed on a 400 liter tank and boil off testing with liquid nitrogen performed at various chamber pressures from one atmosphere to high vacuum. Testing was also performed with an MLI blanket on the outside of the LRMLI.

Dye, S.; Kopelove, A. [Quest Thermal Group, 6452 Fig Street Suite A, Arvada, CO 80004 (United States); Mills, G. L. [Ball Aerospace and Technologies Corp, 1600 Commerce Street, Boulder, CO 80301 (United States)

2014-01-29T23:59:59.000Z

482

Valve for fuel pin loading system  

DOE Patents [OSTI]

A cyclone valve surrounds a wall opening through which cladding is projected. An axial valve inlet surrounds the cladding. Air is drawn through the inlet by a cyclone stream within the valve. An inflatable seal is included to physically engage a fuel pin subassembly during loading of fuel pellets.

Christiansen, D.W.

1984-01-01T23:59:59.000Z

483

Valve for fuel pin loading system  

DOE Patents [OSTI]

A cyclone valve surrounds a wall opening through which cladding is projected. An axial valve inlet surrounds the cladding. Air is drawn through the inlet by a cyclone stream within the valve. An inflatable seal is included to physically engage a fuel pin subassembly during loading of fuel pellets.

Christiansen, David W. (Kennewick, WA)

1985-01-01T23:59:59.000Z

484

Fuel loading and homogeneity analysis of HFIR design fuel plates loaded with uranium silicide fuel  

SciTech Connect (OSTI)

Twelve nuclear reactor fuel plates were analyzed for fuel loading and fuel loading homogeneity by measuring the attenuation of a collimated X-ray beam as it passed through the plates. The plates were identical to those used by the High Flux Isotope Reactor (HFIR) but were loaded with uranium silicide rather than with HFIR`s uranium oxide fuel. Systematic deviations from nominal fuel loading were observed as higher loading near the center of the plates and underloading near the radial edges. These deviations were within those allowed by HFIR specifications. The report begins with a brief background on the thermal-hydraulic uncertainty analysis for the Advanced Neutron Source (ANS) Reactor that motivated a statistical description of fuel loading and homogeneity. The body of the report addresses the homogeneity measurement techniques employed, the numerical correction required to account for a difference in fuel types, and the statistical analysis of the resulting data. This statistical analysis pertains to local variation in fuel loading, as well as to ``hot segment`` analysis of narrow axial regions along the plate and ``hot streak`` analysis, the cumulative effect of hot segment loading variation. The data for all twelve plates were compiled and divided into 20 regions for analysis, with each region represented by a mean and a standard deviation to report percent deviation from nominal fuel loading. The central regions of the plates showed mean values of about +3% deviation, while the edge regions showed mean values of about {minus}7% deviation. The data within these regions roughly approximated random samplings from normal distributions, although the chi-square ({chi}{sup 2}) test for goodness of fit to normal distributions was not satisfied.

Blumenfeld, P.E.

1995-08-01T23:59:59.000Z

485

2004 Pacific Northwest Loads and Resources Study.  

SciTech Connect (OSTI)

The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues, although the database that generates the data for the White Book analysis contributes to the development of BPA's inventory and ratemaking processes. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions that include expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. The load resource balance of BPA and/or the region is determined by comparing resource availability to an expected level of total retail electricity consumption. Resources include projected energy capability plus contract purchases. Loads include a forecast of retail obligations plus contract obligations. Surplus energy is available when resources are greater than loads. This energy could be marketed to increase revenues. Energy deficits occur when resources are less than loads. These deficits could be met by any combination of the following: better-than-critical water conditions, demand-side management and conservation programs, permanent loss of loads due to economic conditions or closures, additional contract purchases, and/or the addition of new generating resources. The loads and resources analysis in this study simulates the operation of the power system under the current Pacific Northwest Coordination Agreement (PNCA). The PNCA defines the planning and operation of seventeen U.S. Pacific Northwest utilities and other parties with generating facilities within the region's hydroelectric (hydro) system. The hydroregulation study used for the 2004 White Book incorporates measures from the National Oceanographic and Atmospheric Administration Fisheries (NOAA Fisheries) Biological Opinion dated December 2000, and the U.S. Fish and Wildlife Service's 2000 Biological Opinion (2000 FCRPS BiOps) for the Snake River and Columbia River projects. These measures include: (1) Increased flow augmentation for juvenile fish migrations in the Snake and Columbia rivers in the spring and summer; (2) Mandatory spill requirements at the Lower Snake and Columbia dams to provide for non-turbine passage routes for juvenile fish migrants; and (3) Additional flows for Kootenai River white sturgeon in the spring; The hydroregulation criteria for this analysis includes the following: (1) Detailed Operation Plan operation for Treaty reservoirs for Operating Year (OY) 2004; (2) PNCA planning criteria for OY 2004; and (3) Juvenile fish bypass spill levels for 2000 FCRPS BiOps implementation. The 2004 White Book is presented in two documents: (1) this summary document of Federal system and PNW region loads and resources, and (2) a technical appendix which presents regional loads, grouped by major PNW utility categories, and detailed contract and resource information. The technical appendix is available only in electronic form. Individual customer information for marketer contracts is not detailed due to confidentiality agreements. The 2004 White Book analysis updates the 2003 White Book. This analysis projects the yearly average energy consumption and resource availability for the study period, OY 2006 through 2015. The study shows the Federal s

United States. Bonneville Power Administration.

2004-12-01T23:59:59.000Z

486

2003 Pacific Northwest Loads and Resources Study.  

SciTech Connect (OSTI)

The Pacific Northwest Loads and Resources Study (White Book), which is published annually by the Bonneville Power Administration (BPA), establishes one of the planning bases for supplying electricity to customers. The White Book contains projections of regional and Federal system load and resource capabilities, along with relevant definitions and explanations. The White Book also contains information obtained from formalized resource planning reports and data submittals including those from individual utilities, the Northwest Power and Conservation Council (Council), and the Pacific Northwest Utilities Conference Committee (PNUCC). The White Book is not an operational planning guide, nor is it used for determining BPA revenues, although the database that generates the data for the White Book analysis contributes to the development of BPA's inventory and ratemaking processes. Operation of the Federal Columbia River Power System (FCRPS) is based on a set of criteria different from that used for resource planning decisions. Operational planning is dependent upon real-time or near-term knowledge of system conditions that include expectations of river flows and runoff, market opportunities, availability of reservoir storage, energy exchanges, and other factors affecting the dynamics of operating a power system. In this loads and resources study, resource availability is compared to an expected level of total retail electricity consumption. The forecasted annual energy electricity retail load plus contract obligations are subtracted from the sum of the projected annual energy capability of existing resources and contract purchases to determine whether BPA and/or the region will be surplus or deficit. Surplus energy is available when resources are greater than loads. This energy could be marketed to increase revenues. Deficits occur when resources are less than loads. Energy deficits could be met by any combination of the following: better-than-critical water conditions, demand-side management and conservation programs, permanent loss of a load (i.e., due to economic conditions or closures), additional contract purchases, and/or new generating resources. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA). The PNCA defines the planning and operation of seventeen U.S. Pacific Northwest utilities and other parties with generating facilities within the region's hydroelectric (hydro) system. The hydroregulation study used for the 2003 White Book incorporates measures from the National Oceanographic and Atmospheric Administration Fisheries (NOAA Fisheries) Biological Opinion dated December 2000, and the U.S. Fish and Wildlife Service's 2000 Biological Opinion (2000 FCRPS BiOps) for the Snake River and Columbia River projects. These measures include: (1) Increased flow augmentation for juvenile fish migrations in the Snake and Columbia rivers in the spring and summer; (2) Mandatory spill requirements at the Lower Snake and Columbia dams to provide for non-turbine passage routes for juvenile fish migrants; and (3) Additional flows for Kootenai River white sturgeon in the spring. The hydroregulation criteria for this analysis includes: an updated Detailed Operation Plan for Treaty reservoirs for Operating Year (OY) 2004, updated PNCA planning criteria for OY 2003, and revised juvenile fish bypass spill levels for 2000 FCRPS BiOps implementation. The 2003 White Book is presented in two documents: (1) this summary document of Federal system and PNW region loads and resources, and (2) a technical appendix which presents regional loads, grouped by major PNW utility categories, and detailed contract and resource information. The technical appendix is available only in electronic form. Individual customer information regarding marketer contracts is not detailed due to confidentiality agreements. The 2003 White Book analysis updates the December 2002 White Book. This analysis projects the yearly average energy consumption and resource availability

United States. Bonneville Power Administration.

2003-12-01T23:59:59.000Z

487

Incorporating Demand Response into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Environmental Energy Technologies Division July 2013 Theprograms types: pricing with enabling technology, pricingwithout enabling technology, direct load control,

Satchwell, Andrew

2014-01-01T23:59:59.000Z

488

Modularization and simulation techniques for heat balance-based energy and load calculation  

E-Print Network [OSTI]

the Loads Toolkit research project is to obtain a heat balance based load calculation procedure that

Richard K. Strand

2001-01-01T23:59:59.000Z

489

Load controller and method to enhance effective capacity of a photovotaic power supply using a dynamically determined expected peak loading  

DOE Patents [OSTI]

A load controller and method are provided for maximizing effective capacity of a non-controllable, renewable power supply coupled to a variable electrical load also coupled to a conventional power grid. Effective capacity is enhanced by monitoring power output of the renewable supply and loading, and comparing the loading against the power output and a load adjustment threshold determined from an expected peak loading. A value for a load adjustment parameter is calculated by subtracting the renewable supply output and the load adjustment parameter from the current load. This value is then employed to control the variable load in an amount proportional to the value of the load control parameter when the parameter is within a predefined range. By so controlling the load, the effective capacity of the non-controllable, renewable power supply is increased without any attempt at operational feedback control of the renewable supply. The expected peak loading of the variable load can be dynamically determined within a defined time interval with reference to variations in the variable load.

Perez, Richard (Delmar, NY)

2003-04-01T23:59:59.000Z

490

Seismic considerations in the evaluation of temporary loads  

SciTech Connect (OSTI)

Temporary loads in nuclear power facilities can result from a number of activities including special one time operating conditions, repair and upgrade conditions, and ALARA requirements for operation, inspection and maintenance. Many times evaluation of these loadings includes their consideration in conjunction with other design basis loadings such as normal loads and extreme event loads including earthquake loadings. At times this combination with design basis extreme loads, such as earthquake, results in predicted structural demands which exceed the design basis capacity. Many times a major contributor to this demand prediction is the earthquake loadings. Discussed in this paper are analytical methods, probabilistic considerations, and earthquake experienced based evaluations which can be applied to reduce the earthquake demand for short term temporary loadings.

Adams, T.M. [Stevenson and Associates, Cleveland, OH (United States); Stevenson, J.D.

1996-12-01T23:59:59.000Z

491

Loading and pre-loading processes generate a distinct siRNA population in Tetrahymena  

SciTech Connect (OSTI)

Highlights: •The Tetrahymena Argonaute protein Twi1p binds to ?28–30-nt siRNAs called scnRNAs. •The size of scnRNAs is determined during a pre-loading process. •The 5? uracil bias of scnRNAs is attributed to pre-loading and loading processes. •The thermodynamic asymmetry of scnRNA duplex doesnot affect the guide strand decision. •scnRNAs may be produced non-sequentially from dsRNA substrates by Dicer. -- Abstract: The various properties of small RNAs, such as length, terminal nucleotide, thermodynamic asymmetry and duplex mismatches, can impact their sorting into different Argonaute proteins in diverse eukaryotes. The developmentally regulated 26- to 32-nt siRNAs (scnRNAs) are loaded to the Argonaute protein Twi1p and display a strong bias for uracil at the 5? end. In this study, we used deep sequencing to analyze loaded and unloaded populations of scnRNAs. We show that the size of the scnRNA is determined during a pre-loading process, whereas their 5? uracil bias is attributed to both pre-loading and loading processes. We also demonstrate that scnRNAs have a strong bias for adenine at the third base from the 3? terminus, suggesting that most scnRNAs are direct Dicer products. Furthermore, we show that the thermodynamic asymmetry of the scnRNA duplex does not affect the guide and passenger strand decision. Finally, we show that scnRNAs frequently have templated uracil at the last base without a strong bias for adenine at the second base indicating non-sequential production of scnRNAs from substrates. These findings provide a biochemical basis for the varying attributes of scnRNAs, which should help improve our understanding of the production and turnover of scnRNAs in vivo.

Mochizuki, Kazufumi, E-mail: kazufumi.mochizuki@imba.oeaw.ac.at; Kurth, Henriette M.

2013-07-05T23:59:59.000Z

492

Methods for Analyzing Electric Load Shape and its Variability  

SciTech Connect (OSTI)

Current methods of summarizing and analyzing electric load shape are discussed briefly and compared. Simple rules of thumb for graphical display of load shapes are suggested. We propose a set of parameters that quantitatively describe the load shape in many buildings. Using the example of a linear regression model to predict load shape from time and temperature, we show how quantities such as the load?s sensitivity to outdoor temperature, and the effectiveness of demand response (DR), can be quantified. Examples are presented using real building data.

Price, Philip

2010-05-12T23:59:59.000Z

493

Radio frequency communication system utilizing radiating transmission lines  

DOE Patents [OSTI]

A radio communication system for use in tunnels, mines, buildings or other shielded locations in which a pair of radiating transmission lines (30), (31) extend through such location in spaced coextensive relation to each other. Each transmission line (30), (31) has at least one unidirectional amplifier (32), (33) interposed therein with the sense of the unidirectional amplifier (32) of one transmission line (30) being opposite to the sense of the unidirectional amplifier (33) of the other transmission line (31). Each of the amplifiers (32), (33) has a gain which is less than the coupling loss between the transmission lines (30), (31). Two or more mobile transceivers (35) in the location served by the system are coupled to the transmission lines (30), (31) by electromagnetic wave propagation in space in order to communicate directly with each other at a given radio frequency within the frequency range of the system.

Struven, Warren C. (San Carlos, CA)

1984-01-01T23:59:59.000Z

494

Discontinuities in transmission lines and wave guides  

E-Print Network [OSTI]

transmission 11ne: nd cosx1sl cables have discrete support and separators. These suoports may be either d1electrics or conductors. In general the support" are desicned to introduce no discontinuity at one freouenCy, hut at other frequencies, they do...=- formin~ ths t of s he 1 ix. Co-xl l cable HC-6 r ansmi as 1 on 1 1 re in t hs f orm 5/U with t 1 e 1nner conductor in the form of s helix with ch:racter1st1c 1mpedance of 95C ohms has been manufactured. The aut hor hs c made h1ph- 1mpedance cable...

Mathis, Harold Fletcher

2012-06-07T23:59:59.000Z

495

Giant vacuum forces via transmission lines  

E-Print Network [OSTI]

Quantum electromagnetic fluctuations induce forces between neutral particles, known as the van der Waals (vdW) and Casimir interactions. These fundamental forces, mediated by virtual photons from the vacuum, play an important role in basic physics and chemistry, and in emerging technologies involving, e.g. micro-electromechanical systems or quantum information processing. Here we show that these interactions can be enhanced by many orders of magnitude upon changing the character of the mediating vacuum-modes. By considering two polarizable particles in the vicinity of any standard electric transmission line, along which photons can propagate in one dimension (1d), we find a much stronger and longer-range interaction than in free-space. This enhancement may have profound implications on many-particle and bulk systems, and impact the quantum technologies mentioned above. The predicted giant vacuum force is estimated to be measurable in a coplanar waveguide line.

Ephraim Shahmoon; Igor Mazets; Gershon Kurizki

2014-07-23T23:59:59.000Z

496

GTO thyristor applications for HVDC transmission systems  

SciTech Connect (OSTI)

The development of a large capacity gate turn off thyristor (GTO) has made it possible to manufacture self-commutated convertors employing GTO for power applications. In this paper, conceptual designs for convertor station equipment for a HVDC transmission system employing current as well as voltage source type GTO convertors (simply referred to as VSTGC and CSTGC) are presented. The study result indicates that the VSTGC is preferable over the CSTGC. Also presented in this paper is a preliminary economic comparison between two HVDC system alternatives for applying power to a weak ac system, one employing a self-commutated GTO convertor and the other employing a combination of line-commutated convertor and a synchronous condenser. The result indicates that the two HVDC convertor station alternatives cost about the same.

Yamada, H.; Sampei, M. (Electric Power Development Co. Ltd., Tokyo (Japan)); Kashiwazaki, H.; Tanaka, C. (Hitachi Ltd., Tokyo (Japan)); Takahashi, T.; Horivchi, T. (Toshiba Corp., Tokyo (JP))

1990-07-01T23:59:59.000Z

497

QER Public Meeting: Petroleum Product Transmission & Distribution  

Broader source: Energy.gov [DOE]

May 27, 2014 Public Meeting: Petroleum Product Transmission & Distribution (including CO2/EOR) On May 27, 2014, the DOE will hold a public meeting in New Orleans, Louisiana. The May 27, 2014 public meeting will feature facilitated panel discussions, followed by an open microphone session. Persons desiring to speak during the 6 open microphone session at the public meeting should come prepared to speak for no more than 3 minutes and will be accommodated on a first- come, first- serve basis, according to the order in which they register to speak on a sign-in sheet available at the meeting location, on the morning of the meeting. In advance of the meeting, DOE anticipates making publicly available a briefing memorandum providing useful background information regarding the topics under discussion at the meeting. DOE will post this memorandum on its website: http://energy.gov

498

Deterministic Josephson Vortex Ratchet with a load  

E-Print Network [OSTI]

We investigate experimentally a deterministic underdamped Josephson vortex ratchet -- a fluxon-particle moving along a Josephson junction in an asymmetric periodic potential. By applying a sinusoidal driving current one can compel the vortex to move in a certain direction, producing average dc voltage across the junction. Being in such a rectification regime we also load the ratchet, i.e., apply an additional dc bias current I_dc (counterforce) which tilts the potential so that the fluxon climbs uphill due to the ratchet effect. The value of the bias current at which the fluxon stops climbing up defines the strength of the ratchet effect and is determined experimentally. This allows us to estimate the loading capability of the ratchet, the output power and efficiency. For the quasi-static regime we present a simple model which delivers simple analytic expressions for the above mentioned figures of merit.

M. Knufinke; K. Ilin; M. Siegel; D. Koelle; R. Kleiner; E. Goldobin

2011-09-29T23:59:59.000Z

499

Methods, apparatus, and systems for monitoring transmission systems  

DOE Patents [OSTI]

A sensing platform for monitoring a transmission system, and method therefor, may include a sensor that senses one or more conditions relating to a condition of the transmission system and/or the condition of an environment around the transmission system. A control system operatively associated with the sensor produces output data based on an output signal produced by the sensor. A transmitter operatively associated with the control system transmits the output data from the control system.

Polk, Robert E. (Idaho Falls, ID) [Idaho Falls, ID; Svoboda, John M. (Idaho Falls, ID) [Idaho Falls, ID; West, Phillip B. (Idaho Falls, ID) [Idaho Falls, ID; Heath, Gail L. (Iona, ID) [Iona, ID; Scott, Clark L. (Idaho Falls, ID) [Idaho Falls, ID

2010-08-31T23:59:59.000Z

500

Electricity pricing for conservation and load shifting  

SciTech Connect (OSTI)

The electricity industry is facing the challenge of increasing costs of reliably meeting demand growth and fully complying with legislative renewable portfolio standards and greenhouse gas reduction targets. However, an electric utility's existing tariffs often don't have rates that increase with consumption volume or vary by time of use, thus not fully exploiting the potential benefits from customer conservation and load shifting. (author)

Orans, Ren; Woo, C.K.; Horii, Brian; Chait, Michele; DeBenedictis, Andrew

2010-04-15T23:59:59.000Z