Powered by Deep Web Technologies
Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,...

2

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Broader source: Energy.gov (indexed) [DOE]

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

3

Application Filling Requirements for Transmission Line and Substation  

Broader source: Energy.gov (indexed) [DOE]

Application Filling Requirements for Transmission Line and Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Wind Solar Program Info

4

Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

United States. Bonneville Power Administration.

1992-02-01T23:59:59.000Z

5

Canby Area Service Project substation and associated transmission line. Environmental Assessment  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

Not Available

1992-02-01T23:59:59.000Z

6

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

7

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado. Additional information is available on Western’s project website.

8

Granby Pumping Plant Switchyard - Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado: Final Environmental Impact Statement Appendices  

Broader source: Energy.gov (indexed) [DOE]

PUMPING PLANT SWITCHYARD - WINDY GAP PUMPING PLANT SWITCHYARD - WINDY GAP SUBSTATION TRANSMISSION LINE REBUILD, GRAND COUNTY, COLORADO DOE/EIS-0400 Final Environmental Impact Statement Appendices Grand County, Colorado June 2013 Appendix A EIS Scoping Report GRANBY PUMPING PLANT - WINDY GAP TRANSMISSION LINE REBUILD PROJECT ENVIRONMENTAL IMPACT STATEMENT SCOPING SUMMARY REPORT December 4, 2007

9

Granby Pumping Plant Switchyard - Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado: Final Environmental Impact Statement Executive Summary  

Broader source: Energy.gov (indexed) [DOE]

PUMPING PLANT SWITCHYARD - WINDY GAP PUMPING PLANT SWITCHYARD - WINDY GAP SUBSTATION TRANSMISSION LINE REBUILD, GRAND COUNTY, COLORADO DOE/EIS-0400 Final Environmental Impact Statement Executive Summary Grand County, Colorado June 2013 Granby Pumping Plant-Windy Gap Substation Transmission Line Rebuild Project FEIS Executive Summary ES-1 EXECUTIVE SUMMARY Introduction Western Area Power Administration (Western), a power marketing administration within the U.S. Department of Energy (DOE), is proposing to rebuild and upgrade the Granby Pumping Plant Switchyard-Windy Gap Substation transmission line in Grand County, Colorado (Grand County). This Environmental Impact Statement (EIS) analyzes the impacts associated with the proposal to remove approximately 13.6 miles of 69-kilovolt (kV) transmission line, construct approximately

10

EA-1671: Big River Substation to Poston Substation 69-Kilovolt...  

Broader source: Energy.gov (indexed) [DOE]

671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California EA-1671: Big River Substation to Poston Substation 69-Kilovolt...

11

Line Rebuild, Relocation and Substation Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Palisades-Goshen Rebuild Wind Projects Line Rebuild, Relocation and Substation Projects BPA has identified several critical rebuild and substation projects...

12

EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission  

Broader source: Energy.gov (indexed) [DOE]

EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Summary Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69-kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing

13

EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission  

Broader source: Energy.gov (indexed) [DOE]

00: Granby Pumping Plant Switchyard-Windy Gap Substation 00: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Summary Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69-kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing

14

Proposed Transmission Towers Proposed New Substation Sites Proposed...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6-1E: Recreation Inset Maps for Map 6-1C and Map 6-1D Proposed Transmission Towers Proposed New Substation Sites Proposed Route Segments (not drawn to scale) New Access Roads...

15

Categorical Exclusion (CX) Determination Proposed Action: Elliot 115kV/43.8kV Transmission Substation Construction and Elliot  

Broader source: Energy.gov (indexed) [DOE]

Elliot 115kV/43.8kV Transmission Substation Construction and Elliot Elliot 115kV/43.8kV Transmission Substation Construction and Elliot 43.8kV Transmission Line. Description of Proposed Action: The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, ND to be owned and operated by Western under Western's Valley City to Forman 115kV transmission line in addition to 8 miles of new 43.8kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.l1: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

16

Construction of Central Ferry-Lower Monumental Transmission Line...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

power line capabilities include transmission, overhead and underground distribution and substation projects. BPA also will be holding two "Meet the Builder" open-houses in late...

17

Dynamic sub-transmission substation expansion planning using learning automata  

Science Journals Connector (OSTI)

This paper presents a new method to solve the dynamic sub-transmission substation expansion planning (SSEP) in electric power distribution networks. The method employs a new algorithm based on learning automata for optimization process. The developed algorithm includes different electrical constraints such as voltage drops, thermal limits, power flow and radial flow constraints. Moreover, prevalent cost indices are taken into consideration. The proposed method is used to solve the dynamic SSEP for Birjand city, center of South-Khorasan province of Iran, up to the year 2024. In addition, effects of the dynamic and pseudo-dynamic planning models are investigated at the study region and the obtained results are compared to those of genetic algorithm. Detailed numerical results and comparisons presented in the paper show that the proposed approach leads to proper solutions and can be used as an effective tool for the dynamic sub-transmission substation expansion planning in an actual large scale distribution network.

Seyed Mahdi Mazhari; Hassan Monsef

2013-01-01T23:59:59.000Z

18

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Broader source: Energy.gov (indexed) [DOE]

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

19

EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line...  

Broader source: Energy.gov (indexed) [DOE]

line. BPA's proposed action is to interconnect the transmission line to an existing BPA substation. Additional information is available at http:www.blm.govordistricts...

20

Electric currents in power transmission line induced by auroral activity  

Science Journals Connector (OSTI)

... the induced current in the Healy-Fairbanks transmission line at one of the transformer sites (substations) in Fairbanks. We show here the simultaneous H component magnetic record and the induced ... approximately the total current flowing in the Healy-Fairbanks line from our measurement at the substation. On the basis of our measurement and the model study, it is indicated that ...

S.-I. AKASOFU; R. P. MERRITT

1979-05-24T23:59:59.000Z

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Environmental Assessment of Proposed Haskill Substation and Tap Line.  

SciTech Connect (OSTI)

To solve the service problems in the Marion area, BPA is proposing to construct a new 230/24.9-kV substation to tap BPA's existing Libby-Conkelly 230-kV line (different than Hot Springs-Conkelly 230-kV line, but an equally acceptable source). Haskill Substation would be approximately one mile northeast of the town of Marion, Montana, and would serve the western portion of Flathead Electric Cooperative's service area. This report describes possible environmental impacts of the proposed action. 8 refs., 4 figs.

Not Available

1984-05-01T23:59:59.000Z

22

BPA transmission, I-5 corridor reinforcement project, updated...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities Proposed New Substation sde.SDE.BPAPlannedTlines sde.SDE.BPAPlannedTlines BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

23

BPA, proposed I-5 Corridor Reinforcement transmission project...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Regional GIS Database, 2009. Facilities Proposed New Substation Proposed Route Segments BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

24

THURSDAY: Deputy Secretary of Energy to Visit Western Area Power Administration Transmission Substation  

Broader source: Energy.gov [DOE]

Deputy Secretary of Energy Elizabeth Sherwood-Randall will visit the Western Area Power Administration for a ceremony at the Electrical District No. 5 Substation to view progress on the Electrical District 5-to-Palo Verde transmission project.

25

EIS-0421: Big Eddy-Knight Transmission Line | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

21: Big Eddy-Knight Transmission Line 21: Big Eddy-Knight Transmission Line EIS-0421: Big Eddy-Knight Transmission Line Overview BPA is proposing to build a new 500 kilovolt (kV) transmission line in Wasco County, Oregon and Klickitat County, Washington and a new substation in Klickitat County. The new BPA transmission line would extend generally northeast from BPA's existing Big Eddy Substation in The Dalles, Oregon, to a new substation (Knight Substation) proposed to be connected to an existing BPA line about 4 miles northwest of Goldendale, Washington. The proposed Big Eddy Knight Transmission Project is needed to increase transmission capacity to respond to requests for transmission service in this area. Public Comment Opportunities No public comment opportunities available at this time.

26

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

27

Transmission line modeling with explicit grounding representation  

Science Journals Connector (OSTI)

This paper presents a new model of an overhead transmission line for electromagnetic transient computations. The unique feature of the model is the explicit representation of the tower grounding configuration and terminal substation grounds. Other properties of the model are: (1) accurate frequency dependent parameter representation from DC to several MHz; (2) explicit modeling of line asymmetries; and (3) high numerical efficiency. The model implementation is based on the solution of the transmission line differential equations resulting in a set of step response functions, forming a matrix. The step response matrix is utilized in a time domain simulation of electric power networks by a linear convolution scheme. The transmission line model is validated with actual system test data. The model is useful for computing the ground potential rise of transmission towers due to lightning or switching surges, insulation stress, etc. Typical applications are described in the paper.

G.J. Cokkinides; A.P.Sakis Meliopoulos

1988-01-01T23:59:59.000Z

28

Transmission Line Security Monitor  

SciTech Connect (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

29

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

30

EIS-0124: Conrad-Shelby Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

31

Design, Simulation, and Analysis of Substation Automation Networks  

E-Print Network [OSTI]

on the Substation Automation Systems (SAS). Substations are nodes in the smart grid infrastructure that help the in transportation of power by connecting the transmission and distribution lines. The SAS applications are con figured to operate with minimal human...

Kembanur Natarajan, Elangovan

2012-07-16T23:59:59.000Z

32

The effect of Relay Protection on the Substation Reliability  

Science Journals Connector (OSTI)

This paper presents a model for evaluating the reliability of the substation actions after transmission grid faults. The model ... of different line protection systems by using the substation reliability model is...

Liisa Pottonen; Urho Pulkkinen…

2004-01-01T23:59:59.000Z

33

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

34

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

35

Substation voltage upgrading  

SciTech Connect (OSTI)

This report addresses specific issues to support sound yet not unduly conservative uprating practices for substations. The main parts of the report cover the insulation withstand and overvoltage protection aspects, environmental measurements, reliability criteria, and industry experience. First the insulation design concerns are addressed. Substation stress by a backflashover of the line insulation due to lightning in the vicinity of the substation is recognized as a critical stress. A representative part of a 550 kV BIL substation was erected at the EPRI High Voltage Transmission Research Center, where also a special test circuit was assembled to produce a fast front, slow tail (0.2/200 {mu}s) wave. The substation as well as some special configurations were tested for line-to-ground and line-to-line withstand. Computer studies were performed to complement the test results. A number of important conclusions was reached. The most prominent result in that the high frequency oscillations, as caused by reflections within the substation, do not effect the Critical Flashover Voltage (CFO). The present practice, based on the highest peak is therefore very conservative. The slow tail of the wave appears to dictate the CFO. An arrester model for computer studies to represent very fast as well as slow phenomena was derived. It is based on full scale arrester test data, made available in this project. The computer program to calculate arrester model parameters is also a part of the report. The electric environmental measurements are reported for the tested substation at the HVTRC and for the uprated substation of Public Service Company of Colorado, both before and after the uprating. The performance is satisfactory when corona free hardware is used. Insulation design criteria are analyzed based on substation reliability, the system viewpoint and consequences of the failure. Utility experience with uprated substations is reviewed.

Panek, J.; Elahi, H.; Lux, A.; Imece, A.F. (General Electric Co., Schenectady, NY (United States). Power Systems Engineering Dept.); LaPanse, R.A.; Stewart, J.R. (Public Service Co. of Colorado, Denver, CO (United States))

1992-04-01T23:59:59.000Z

36

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

37

Study on integrated automation system of traction substation for express railway lines  

Science Journals Connector (OSTI)

The structure and function of integrated automation system of traction substation for express electric railway lines developed by our university are discussed in this paper. The paper mainly describes the function installation of monitoring and communication ...

Gao Shibin; Chen Xiaochuan; Wang Qian; Wang Ren; Chen Weirong; Xiong Liebin

2002-11-01T23:59:59.000Z

38

BPA, Transmission, I-5 Corridor Reinforcement Project Map, August...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

lettered route segments added for consideration Segments no longer being considered 5 K BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

39

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

40

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

42

Transmission Line Circuit Alexander Glasser  

E-Print Network [OSTI]

Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

Anlage, Steven

43

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network [OSTI]

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

44

Electric Transmission Line Siting Compact  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

45

Kangley - Echo Lake Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

STATEMENT STATEMENT Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Kangley-Echo Lake Transmission Line Project State Involved: Washington Abstract: BPA is proposing to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmis- sion line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as

46

EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

47

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |  

Broader source: Energy.gov (indexed) [DOE]

80: Big Bend to Witten Transmission Line Project, South Dakota 80: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with DOE's Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download April 12, 2011

48

Research on Secure Message Transmission of Smart Substation Based on GCM Algorithm  

Science Journals Connector (OSTI)

Based on IEC61850 standard smart substation system using ethernet architecture is required for ... , MMS are common messages used in smart substation , whether these messages can be transmitted ... is critical to...

BaoYi Wang; MinAn Wang; ShaoMin Zhang

2012-01-01T23:59:59.000Z

49

Electrical transmission line diametrical retainer  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

50

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

51

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota  

Broader source: Energy.gov [DOE]

The USDA Rural Utilities Service, with DOE’s Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1).)

52

EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service’s construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

53

Substation grounding programs  

SciTech Connect (OSTI)

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 2, is a users manual and an installation and validation manual for the computer program SMECC (Substation Maximum Earth Current Computation Program). This program analyzes the electric current distribution among grounded structures inside and outside a substation for different fault conditions. The fault conditions are automatically selected by the program, or they may be specified by the user, or both. The fault condition resulting in maximum substation earth current is identified and reported. Data requirements for this program are: ground impedance, transformer data, transmission line data, transmission line grounding impedances, etc. The program provides four types of standard outputs: (1) a report of voltages and current flow in the unfaulted system, (2) a brief report of the maximum ground potential rise (worst fault condition), (3) a summary report of all fault conditions which have been analyzed by the program, and (4) a detailed report of voltages and current flow for a selected set of fault conditions.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

54

Chapter 3 - Substation Layouts  

Science Journals Connector (OSTI)

Publisher Summary Substations are the points in the power network, where transmission lines and distribution feeders are connected together through circuit breakers or switches via busbars and transformers. This allows for the control of power flows in the network and general switching operations for maintenance purposes. This chapter describes the principal substation layouts, the effects of advancements in substation equipment, the modular design, the compact substations, and the moves toward design and construction “turnkey” contract work. The descriptions concentrate on air insulated switchgear (AIS) outdoor open terminal designs at rated voltages of 72 kV and higher. In an ideal situation all circuits and substation equipment would be duplicated such that following a fault or during maintenance a connection remains available. This would involve very high cost. Methods have therefore been adopted to achieve a compromise between complete security of supply and capital investment. A measure of circuit duplication is adopted while recognizing that duplication may itself reduce the security of supply by, for example, providing additional leakage paths to earth.

C.R. Bayliss; B.J. Hardy

2012-01-01T23:59:59.000Z

55

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

Appendix A Appendix A Consultation Letters Appendix A- Consultation Letters A-1 APPENDIX A CONTENTS A-2 Letter from the State Historic Preservation Office regarding Certificate of Environmental Compatibility Case No. 111: The Proposed Tucson Electric Power Company (TEP) South Substation to Nogales Transmission Line, Pima and Santa Cruz Counties, Arizona A-6 Letter from Tetra Tech, Inc. to El Paso Natural Gas, regarding the Proposed Tucson Electric Power Transmission Line Adjacent to an El Paso Natural Gas Company Pipeline A-8 Letter from Tetra Tech, Inc. to the Drug Enforcement Administration, regarding the Proposed Tucson Electric Power Transmission Line near Nogales, Arizona A-10 Letter from Tetra Tech, Inc. to the U.S. Immigration and Naturalization Service, regarding the

56

Substation reliability -- Practical application and system approach  

SciTech Connect (OSTI)

Practical application of reliability analysis was made for the comparison of alternate line and bus arrangements of a future transmission substation with potential savings of up to $3.6 M. The paper describes how both the substation and the power system were simulated by using computer programs STAREL and COMREL. It presents the method used to obtain the most accurate estimates for the outage data of the system components. Finally, it expresses the results with simple reliability indices which can be meaningful for management. The results of the study show the need to include the reliability of the transmission system in a substation reliability evaluation.

Save, P. [Southern California Edison Co., Rosemead, CA (United States)] [Southern California Edison Co., Rosemead, CA (United States)

1995-02-01T23:59:59.000Z

57

Substation reliability -- Practical application and system approach  

SciTech Connect (OSTI)

Practical application of reliability analysis was made for the comparison of alternate line and bus arrangements of a future transmission substation with potential savings of up to 53.6 M. The paper describes how both the substation and the power system were simulated by using computer programs STAREL and COMREL. It presents the method used to obtain the most accurate estimates for the outage data of the system components. Finally, it expresses the results with simple reliability indices which can be meaningful for management. The results of the study show the need to include the reliability of the transmission system in a substation reliability evaluation.

Save, P. [Southern California Edison Co., Rosemead, CA (United States)

1994-12-31T23:59:59.000Z

58

Coordination of Transmission Line Transfer Capabilities  

E-Print Network [OSTI]

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

59

Transmission Lines Emulating Moving Media  

E-Print Network [OSTI]

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

60

Montana-to-Washington Transmission System Upgrade Project - M2W  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

an existing BPA transmission line, and the proposed addition of a new series compensation substation along other existing BPA transmission lines. To understand the potential...

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EA-1982: Parker-Davis Transmission System Programmatic Operations...  

Energy Savers [EERE]

on Western's Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance...

62

BPA, Transmission, I-5 Corridor Project, data by segments and...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

alternatives for new transmission system facilities, including the new transmission line and substations proposed for the I-5 Corridor Reinforcement Project. Foremost is...

63

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

64

McNary-John Day Transmission Line Project Record of Decision (DOE/EIs-0332), (11/08/02)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Record of Decision Decision The Bonneville Power Administration (Bonneville) has decided to construct the proposed McNary-John Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. Bonneville has decided to implement the proposed action identified in the McNary-John Day Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0332, August 2002). The proposed action consists of building 79 miles of 500-kilovolt (kV) transmission line between Bonneville's McNary Substation and John Day Substation. As part of the proposed action, Bonneville has also decided to construct certain short-line routing alternatives identified in the Final EIS. These alternatives are the

65

EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California  

Broader source: Energy.gov [DOE]

The Department of the Interior’s Bureau of Indian Affairs is preparing this EA, with DOE’s Western Area Power Administration as a cooperating agency.

66

EPON’s Research on Transmission of Sampling Value in Process Level of Digital Substation  

Science Journals Connector (OSTI)

Non-conventional instrument transformers and optical fiber communication are utilized in secondary system of digital substation. Sampling value signals are transmitted to Merging ... Finally, the deployment of EP...

Qiu Ming-yi; Xu Xi-dong

2013-01-01T23:59:59.000Z

67

Coiled transmission line pulse generators  

DOE Patents [OSTI]

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

68

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

69

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Impact Statement for the Southline Transmission Line Project General NEPA Document Info Energy Sector Transmission Environmental Analysis Type EIS Applicant Southline...

70

Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

N /A

2003-06-20T23:59:59.000Z

71

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

72

EIS-0107: Mead-Phoenix +500-kV Direct Current Transmission Line  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration (WAPA) prepared this statement to analyze the potential environmental and socioeconomic impacts arising from WAPA and regional project sponsors’ proposal to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC), connecting the Westwing Substation, located north of Phoenix, Arizona, with a new McCullough II Substation, located approximately 14 miles west of Boulder City, Nevada. This statement modifies a previously prepared federal statement from which the participants' election to proceed had not occurred at the time this statement was prepared.

73

MagLab - Transmission Lines Tutorial  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tweet Education Home > MagLab U > Interactive Tutorials Arrow Transmission Lines More than half a million miles of high-voltage transmission lines criss-cross the United States. If...

74

EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

75

Spectral Theory for Nonconservative Transmission Line Networks  

E-Print Network [OSTI]

Spectral Theory for Nonconservative Transmission Line Networks Robert Carlson Department The global theory of transmission line networks with nonconserva- tive junction conditions is developed from is determined. Specialized results are developed for rational graphs. 1 #12;1 Introduction The transmission line

Carlson, Bob

76

Estes-Flatiron Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

77

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

78

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

79

Magnetically insulated transmission line oscillator  

DOE Patents [OSTI]

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

80

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Environmental Assessment of Proposed Filbert Substation and Tap Project.  

SciTech Connect (OSTI)

The proposal is a cooperative (jointly funded and owned) action between Bonneville Power Administration (BPS) and FGLandP involving construction of the 115/12.5-kV Filbert Substation. BPA would also build a 0.8-mile overhead 115-kV tapline from BPA's Forest Grove-McMinnville 115-kV line to the proposed substation. The Forest Grove-McMinnville transmission line has available capacity to support the proposed substation. The FGLandP would build four underground distribution circuits to connect the substation to its existing distribution system. It is normally BPA's practice to consider several substation location alternatives as a part of its facility siting process. The proposed substation site was recommended after a preliminary field evaluation by BPA determined that building on the proposed site was preferable because available sites south of the Tualatin Valley Highway and Southern Pacific Railroad were either on presently cultivated farmland, were in a floodplain, or were inaccessible without extensive access road construction. The proposed substation site is owned by FGLandP, is designated for use as a utility substation in the Forest Grove Comprehensive Plan, and was purchased by FGLandP in anticipation of a need for its use as a substation site because of its central location in relation to existing and forecasted loads. The site is accessible from Filbert Street (city road), and is gently sloping. This report describes potential environmental impacts of the proposed actions.

United States. Bonneville Power Administration.

1984-03-01T23:59:59.000Z

82

EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington  

Broader source: Energy.gov [DOE]

The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 60- to 67-mile long 230-kV transmission line. BPA’s proposed action is to interconnect the transmission line to an existing BPA substation. Additional information is available at http://www.blm.gov/or/districts/spokane/plans/vph230/.

83

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft Envrionmental Impact Statement(02/2002)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Draft Environmental Impact Statement (DOE/EIS -0332) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior: U.S. Fish and Wildlife Service, Bureau of Land Management, and Bureau of Indian Affairs. Department of Army: Corps of Engineers. States Involved: Oregon and Washington Abstract: Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt- transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about

84

Transmission Line MTF: Magnetized Target Fusion  

E-Print Network [OSTI]

Transmission Line MTF: Magnetized Target Fusion Initial target: preheated & magnetized Subsequent for the FRC. Abstract Block Diagram theta coil transmission line Bias cap. bank maincapacitor inductor PI cap compression to fusion conditions Magnetic field of at least 5 T in a closed-field line topology Density ~ 1017

85

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

nearest transmission system substation, and are derived fromthe nearest transmission substation, the capacity factor of

Mills, Andrew D

2011-01-01T23:59:59.000Z

86

EIS-0365: Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov [DOE]

On February 27, 2001, Baja California Power, Inc. (hereafter referred to as Intergen), InterGen Aztec Energy, V.B.V., filed an application with DOE, Office of Fossil Energy, for a Presidential permit that would allow construction and connection of a double-circuit, 230-kV transmission line extending from the Imperial Valley Substation in California for a distance of about 6 mi (10 km) to a point west of Calexico at the U.S.-Mexico border.

87

Intelligent fault diagnosis of power transmission line; -.  

E-Print Network [OSTI]

??This dissertation presents the application of recent intelligent newlinetechniques for fault diagnosis in electrical power transmission line Fault newlinesection identification classification and location are the… (more)

Malathi, V

2014-01-01T23:59:59.000Z

88

Big Bend-Witten Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Bend-Witten Transmission Line Project The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared a draft environmental...

89

Detonator comprising a nonlinear transmission line  

DOE Patents [OSTI]

Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

Elizondo-Decanini, Juan M

2014-12-30T23:59:59.000Z

90

Williston to Stateline Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Williston to Stateline Transmission Line Project, ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental...

91

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

92

Crews repair transmission lines after Washington wildfire  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Privacy Publications Tribal Affairs Newsroom Search News Articles... Search Crews repair transmission lines after Washington wildfire 662014 12:00 AM Tweet Page Content BPA...

93

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

94

East Grangeville Substation : Environmental Assessment.  

SciTech Connect (OSTI)

BPA proposes to build a 6/8 MVA, 115/13.8-kV substation about 0.7 mile (1.2 km) east of Grangeville, Idaho. BPA's substation yard would comprise an area of 70 by 72 feet (21 by 22 m) containing a 115/13.8-kV transformer. Energization for the substation is scheduled for September 1983. In connected actions the Co-op would build a 13.8-kV switching station and a 13.8/34.5-kV step-up station. The Co-op would require an area of 100 by 55 feet (31 by 17 m) in addition to the BPA yard. The total area needed for the combined BPA/Co-op substation would be approximately 170 by 127 feet (52 by 40 m) or one-half of an acre (0.20 ha). The Co-op would also build two 13.8-kV feeders and one 34.5-kV feeder underground south of the substation to overhead distribution lines along State Highway 13 with space for one future feeder. Another 13.8-kV feeder would exit the substation underground and loop around to the north to reconnect to the existing 13.8-kV overhead line. TWWP would build a tapline from their Grangeville-Kamiah-Nez Perce (Grangeville-Nez Perce No. 2) 115-kV transmission line to the substation. This line would be approximately 0.75 mile (1.2 km) long and would consist of single wood pole structures built on the route of an existing Co-op distribution line. The new and existing lines would use the same poles. A temporary access road would be built for 0.25 mile (0.4 km). The remaining 0.5 mile (0.8 km) section would be adjacent to a county road and would not require an access road. Two sites were identified as meeting the technical requirements. Site 2 is recommended.

United States. Bonneville Power Administration.

1983-03-01T23:59:59.000Z

95

Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed.

N /A

2002-08-16T23:59:59.000Z

96

Ashland Area Support Substation Project  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power Light Company's (PP L) 115-kilovolt (kV) transmission lines and through PP L's Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP L to allow transfer of three megawatts (MW's) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them.

Not Available

1992-06-01T23:59:59.000Z

97

BPA, Transmission, I-5 Corridor Reinforcement Project, August...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Administration has refined the potential transmission line route segments and substation sites for the proposed I-5 Corridor Reinforcement Project. The refinements are...

98

BPA, transmission, I-5 Corridor Reinforcement Project, new Permission...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

also identify protective measures that BPA would take during the construction process if BPA decides to build a transmission line or substation. An archeologist or historian may...

99

BPA Transmission, I-5 Corridor Reinforcement Project, Scoping...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the transmission lines and consider energy efficiency strategies. Commenters also asked BPA to consider whether a new substation will be needed half-way between Troutdale and...

100

BPA, Transmission, presentation on I-5 Corridor Reinforcement...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

high-voltage line between two proposed substations in Castle Rock, Washington and Troutdale, Oregon. Would relieve a major transmission bottleneck in the Northwest. BPA has not...

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Electric Transmission Line Flashover Prediction System  

E-Print Network [OSTI]

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

102

Transmission line protection based on travelling waves  

Science Journals Connector (OSTI)

Major problem of tripping signal of a relay based on steady state component does not warranty faster tripping schemes for protection of extra high voltage transmission lines. Proposed work has made an attempt to find solution to the problem of fault ... Keywords: postfault voltage, relaying signals, surge impedence, transmission line protection, travelling waves

Anuradha S. Deshpande; Grishma S. Shah

2011-12-01T23:59:59.000Z

103

A distributed on-line HV transmission condition monitoring information system  

SciTech Connect (OSTI)

China Light and Power Company Ltd. (CLP) is responsible for supplying electricity to the whole of Hong Kong except Hong Kong Island and Lamma Island. In CLP`s Castle Peak power plant, 19 kV and 23 kV electric supplies are generated. The voltage is then stepped up to 400 kV for transmission. The intermediate control between those transformers and the major 400 kV overhead transmission system lies with a standard One and a half Breaker Configuration switch substations. The substation houses single phase encapsulated SF{sub 6} circuit breakers. In the urban centers, 400 kV substations are installed to step down 400 kV to 132 kV or further to 11 kV for distribution. This paper describes the development of a on-line distributed information system for monitoring the conditions of the whole HV transmission system. The system continuously monitors status of each circuit breaker (CB) together with important operational parameters, such as duration during making and breaking, operations of hydraulic pumps and SF{sub 6} gas pressure etc. Each group of CBs is monitored by a standalone microcontroller using a local area network with a baud rate of 9,600. The information can be recorded on the harddisk of an on-site microcomputer and further transmitted back to a remote computer for alarm generation and multi-station supervision. The CLP 400 kV substation and the Tsz Wan Shan 400 kV substation are among the first targets for development.

Chan, W.L. [Hong Kong Polytechnic Univ., Kowloon (Hong Kong)] [Hong Kong Polytechnic Univ., Kowloon (Hong Kong); Pang, S.L.; Chan, T.M. [China Light and Power Co. Ltd., Hong Kong (Hong Kong)] [China Light and Power Co. Ltd., Hong Kong (Hong Kong); So, A.T.P. [City Univ. of Hong Kong, Kowloon (Hong Kong)] [City Univ. of Hong Kong, Kowloon (Hong Kong)

1997-04-01T23:59:59.000Z

104

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

105

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

106

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

107

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Line Line (Redirected from Definition:Transmission lines) Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

108

Inter substation data communications  

SciTech Connect (OSTI)

The paper briefly describes the scada system operated by ComEd for substation communications. This system has proven a reliable means for monitor and control of the generation, transmission, and distribution system. An attempt to automate stand-alone substation functions into the RTU has had limited success. An automated substation capacitor control algorithm was incorporated into a PC. The PC directly interfaced with the RTU through the serial port for analog monitoring and control of the capacitor banks. There were no further enhancements or development of other control algorithms with the PC. The paper discusses the power system data evolution, the proposed design improvements, and implementation concerns.

Lukas, M.R. [ComEd, Chicago, IL (United States)

1996-10-01T23:59:59.000Z

109

Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or conductors, and two neutral ground wires that would provide both lightning protection and fiber optic communications, on a single set of support structures. The transmission line would originate at TEP's existing South Substation (which TEP would expand), in the vicinity of Sahuarita, Arizona, and interconnect with the Citizens Communications (Citizens) system at a Gateway Substation that TEP would construct west of Nogales, Arizona. The double-circuit transmission line would continue from the Gateway Substation south to cross the U.S.-Mexico border and extend approximately 60 miles (mi) (98 kilometers [km]) into the Sonoran region of Mexico, connecting with the Comision Federal de Electricidad (CFE, the national electric utility of Mexico) at CFE's Santa Ana Substation.

N /A

2003-08-27T23:59:59.000Z

110

fault diagnosis of a high voltage transmission line using waveform ...  

E-Print Network [OSTI]

Oct 4, 2013 ... FAULT DIAGNOSIS OF A HIGH VOLTAGE TRANSMISSION LINE USING ... Fault types such as single line to ground, line to line, double line to ...

Ripunjoy Phukan

2013-10-04T23:59:59.000Z

111

Single transmission line data acquisition system  

DOE Patents [OSTI]

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

Fasching, George E. (Morgantown, WV)

1984-01-01T23:59:59.000Z

112

Microsoft Word - CX_DeMoss_Substation_Expansion_130531  

Broader source: Energy.gov (indexed) [DOE]

Alaric Hsu Alaric Hsu Project Manager - TEP-CSB-2 Proposed Action: De Moss Substation Expansion Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Sherman County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to expand its De Moss Substation yard located in Sherman County, Oregon. The expansion is necessary to install additional reactors that would provide the necessary reactive support to address the extreme high voltage at De Moss Substation resulting from the loss of the Big Eddy - DeMoss transmission line during winter peak conditions. The equipment at De Moss Substation is currently sustaining voltage

113

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

114

Gila to North Gila Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Gila to North Gila Transmission Line Rebuild and Upgrade Project News and updates: On March 21, 2014, Western issued a Finding of No Significant Impact for the proposed action,...

115

Synthesis of Lumped Transmission-Line Analogs  

E-Print Network [OSTI]

Transmission lines and their lumped approximating networks have long been incorporated into radio-frequency power amplifiers to improve efficiency and shape circuit waveforms and are beginning to perform a similar roles ...

Phinney, Joshua W.

116

Life cycle assessment of electricity transmission and distribution—part 2: transformers and substation equipment  

Science Journals Connector (OSTI)

The purpose of this paper is to characterize the environmental impacts of equipment used in power transmission and distribution. This study is divided in two parts, each addressing different main components of th...

Raquel Santos Jorge; Troy R. Hawkins…

2012-02-01T23:59:59.000Z

117

Wild Horse 69-kV transmission line environmental assessment  

SciTech Connect (OSTI)

Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

NONE

1996-12-01T23:59:59.000Z

118

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines  

E-Print Network [OSTI]

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines Martin Gander problem for multiple coupled transmission lines by a so-called transverse partitioning technique. The WR mode transmission line problems. Previous longitudinal partitioning work using the classical WR

Gander, Martin J.

119

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES  

E-Print Network [OSTI]

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES ANNE-SOPHIE BONNET propagation in the microstrip transmission lines used in microelectronics. In the first part, the case of the perfectly conducting strip. Key words. superconducting transmission lines, waveguides, spectral analysis

Ramdani, Karim - Institut de Mathématiques �lie Cartan, Université Henri Poincaré

120

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

SciTech Connect (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

A numerical tool for transmission lines  

Science Journals Connector (OSTI)

The electric line numerical study is usually made through a harmonic approach with the impedance concept based on the Finite Difference discretization in both the time and space domains. These methods present severe drawbacks when used in impulse working ... Keywords: differential system, finite element method, impulse voltage, stiff time problem, transmission line

Hervé Bolvin; André Chambarel; Philippe Neveux

2005-05-01T23:59:59.000Z

122

Auroral effects on power transmission line systems  

Science Journals Connector (OSTI)

... -south direction ( 166 km), is terminated at an autotransformer at the Gold Hill substation which is located just outside the city of Fairbanks. Aurora-induced current fluctuations in ... voltage developed across a 62.5 ?,O resistor inserted between the autotransformer neutral and substation ground.

S.-I. Akasofu; J. D. Aspnes

1982-01-14T23:59:59.000Z

123

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hot Springs to Anaconda Transmission Line Rebuild Project, Montana EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power...

124

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy Savers [EERE]

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

125

Request for Information on Permitting of Transmission Lines:...  

Broader source: Energy.gov (indexed) [DOE]

Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

126

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild...  

Energy Savers [EERE]

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon Summary...

127

EIS-0499: Great Northern Transmission Line Project, Minnesota...  

Energy Savers [EERE]

EIS-0499: Great Northern Transmission Line Project, Minnesota EIS-0499: Great Northern Transmission Line Project, Minnesota SUMMARY This EIS will evaluate the potential...

128

Amended Notice of Intent for the Northern Pass Transmission Line...  

Broader source: Energy.gov (indexed) [DOE]

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Amended Notice of Intent for the Northern Pass Transmission Line Project...

129

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant...  

Broader source: Energy.gov (indexed) [DOE]

0: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties,...

130

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon...  

Broader source: Energy.gov (indexed) [DOE]

1: Alvey-Fairview Transmission Line Rebuild Project, Oregon EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon Summary Bonneville Power Administration prepared an EA...

131

Substation grounding programs  

SciTech Connect (OSTI)

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 5, is an applications guide of the three computer programs. SOMIP, SMECC, and SGSYS, for the purpose of designing a safe substation grounding system. The applications guide utilizes four example substation grounding systems for the purpose of illustrating the application of the programs, SOMIP, SMECC, and SGSYS. The examples are based on data provided by four contributing utilities, namely, Houston Lighting and Power Company, Southern Company Services, Puget Sound Power and Light Company, and Arizona Public Service Company. For the purpose of illustrating specific capabilities of the computer programs, the data have been modified. As a result, the final designs of the four systems do not necessarily represent actual grounding system designs by these utilities. The example system 1 is a 138 kV/35 kV distribution substation. The example system 2 is a medium size 230 kV/115 kV transmission substation. The third example system is a generation substation while the last is a large 525 kV/345 kV/230 kV transmission substation. The four examples cover most of the practical problems that a user may encounter in the design of substation grounding systems.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

132

Substation flood protection: A case study  

SciTech Connect (OSTI)

On July 18, 1996, the City of Naperville, Illinois encountered a substantial storm event ranging from nine to fourteen inches of rainfall across town in less than twelve hours, with the majority falling over a four-hour period. The watershed containing the City`s Westside substation encountered the most significant rainfall totals, resulting in a flood crest in the substation area of approximately thirteen inches of water. The station is a 138 kV substation, and the flooding of this station caused a power loss to approximately 60% of the City`s customers for more than eight hours. The water level posed no threat to yard equipment, however, within the substation control building, flood water shorted out control circuits and damaged transmission line relay systems. Crews worked round-the-clock for most of a week to return all transmission lines and transformers to normal service. The 15 kV switchgear ultimately had to be replaced due to recurring control circuit problems. Once the station was restored and the cleanup efforts underway, the City embarked on an evaluation to determine what condition or conditions allowed the flooding to occur, and what could be done in the future to avoid this problem to ensure that the customers of Naperville would not experience another service outage of this magnitude due to flooding.

Gacek, D.B. [City of Naperville, IL (United States); McGovern, L.L. [Burns and McDonnell, Westmont, IL (United States)

1999-11-01T23:59:59.000Z

133

Substation grounding.  

E-Print Network [OSTI]

??Designing a proper substation grounding system is quite complicating. Many parameters affect its design. In order for a grounding design to be safe, it needs… (more)

Baleva, Inna

2012-01-01T23:59:59.000Z

134

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

135

Electric Transmission Lines (Nebraska) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Nebraska) Nebraska) Electric Transmission Lines (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Siting and Permitting Provider Public Service Commission The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway

136

EC Transmission Line Risk Identification and Analysis  

SciTech Connect (OSTI)

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

137

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

nearest transmission system substation, and are derived fromthe nearest transmission substation, the capacity factor ofor above) transmission substation. Capital costs vary for

Mills, Andrew

2010-01-01T23:59:59.000Z

138

Substation Operation  

Science Journals Connector (OSTI)

... THIS book is intended to help the workman to understand the principles of substation operation. It is a good attempt at giving somewhat advanced technical knowledge in such ... ." We are told not to use water to put out a fire at a substation before the station has been made completely " dead." The reason given for this ...

1925-08-01T23:59:59.000Z

139

Proceedings: Tenth EPRI Substation Equipment Diagnostics Conference  

SciTech Connect (OSTI)

Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The tenth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

None

2002-06-01T23:59:59.000Z

140

Proceedings: Substation Equipment Diagnostics Conference IX  

SciTech Connect (OSTI)

Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The ninth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

None

2001-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Proceedings: Substation Equipment Diagnostics Conference VIII  

SciTech Connect (OSTI)

Advanced monitoring and diagnostic sensors and systems are needed to provide reliable and accurate information for determining the condition of major transmission substation equipment. The eighth EPRI Substation Equipment Diagnostics Conference highlighted the work of researchers, universities, manufacturers, and utilities in producing advanced monitoring and diagnostic equipment for substations.

None

2000-06-01T23:59:59.000Z

142

COMPLETE FAULT ANALYSIS FOR LONG TRANSMISSION LINE USING  

E-Print Network [OSTI]

COMPLETE FAULT ANALYSIS FOR LONG TRANSMISSION LINE USING SYNCHRONIZED SAMPLING Nan Zhang Mladen 77843-3128, U.S.A. Abstract: A complete fault analysis scheme for long transmission line represented fault analysis tool for transmission lines is very useful for on-line confirmation and off-line trouble

143

Transmission line environmental assessment guidance document  

SciTech Connect (OSTI)

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

144

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-96) Snohomish District Substations  

Broader source: Energy.gov (indexed) [DOE]

6) 6) - Snohomish District Substations Dennis Sjoquist - TFN/Snohomish Snohomish Regional Manager Proposed Action: Vegetation Management for the following facilities located in the Snohomish District: Bellingham Custer Fidalgo Intalco Lopez Island Monroe Murray, V.M. Snohomish Snoking Whatcom Whatcom Skagit Whatcom San Juan Snohomish Snohomish Snohomish Snohomish Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bareground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Snohomish District of the Snohomish Region. Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities.

145

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-94) Covington District Substations  

Broader source: Energy.gov (indexed) [DOE]

4) 4) - Covington District Substations Dennis Sjoquist - TFN/Snohomish Snohomish Regional Manager Proposed Action: Vegetation Management for the following facilities located in the Covington District: Covington Echo Lake Lynch Creek Maple Valley Narrows Raver, P.J. South Tacoma Steilacoom Surprise Lake Tacoma King King Pierce King Pierce King Pierce Pierce Pierce Pierce Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bareground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Covington District of the Snohomish Region. Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities.

146

Design of a differential protection scheme for a 345 kV transmission line using SEL 311L relays.  

E-Print Network [OSTI]

??Transmission networks are an important part of an electric power system. They help transfer power from the point of generation (power plants) to the substation.… (more)

Subrahmanyam, Tarangini Karoor

2014-01-01T23:59:59.000Z

147

DOE/EA-1596: Finding of No Significant Impact for Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota (02/18/09)  

Broader source: Energy.gov (indexed) [DOE]

WESTERN AREA POWER ADMINISTRATION WESTERN AREA POWER ADMINISTRATION UPPER GREAT PLAINS CUSTOMER SERVICE REGION FINDING OF NO SIGNIFICANT IMPACT Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota DOEIEA-1596 AGENCY: U.S. Department of Energy (DOE), Western Area Power Administration (Western) ACTION: Finding of No Significant Impact SUMMARY: Basin Electric Power Cooperative (Basin) has requested to interconnect their proposed new Belfield to Rhame 230-kilovolt (kV) transmission line and new Rhame Substation (Project) to the Western Area Power Administration's (Western) transmission system at Western's existing Belfield Substation. Under its Open Access Transmission Service Tariff (Tariff), Western is required to respond to Basin's interconnection requests. Western's Tariff

148

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

149

Ashland Area Support Substation Project : Environmental Assessment.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power & Light Company`s (PP&L) 115-kilovolt (kV) transmission lines and through PP&L`s Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP&L to allow transfer of three megawatts (MW`s) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP&L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them.

United States. Bonneville Power Administration.

1992-06-01T23:59:59.000Z

150

A CURRENT CONTROLLED VARIABLE DELAY SUPERCONDUCTING TRANSMISSION LINE  

E-Print Network [OSTI]

I I I I 1388 A CURRENT CONTROLLED VARIABLE DELAY SUPERCONDUCTING TRANSMISSION LINE S. M. Anlage, H line. The device makes use of the change in kinetic inductance of a superconducting transmission line, fabrication of transmission lines with such films provides the means for constructing a continuously variable

Anlage, Steven

151

Feasibility of thyristor controlled series capacitor for distribution substation enhancements  

SciTech Connect (OSTI)

While Thyristor Controlled Series Capacitors (TCSCs) are already being used for control of transmission system power flows, the dynamic adjustment of transmission infeed impedances presents other system enhancement opportunities. In the case of the Con Edison system, distributing substation upgrades are severely constrained by limits to existing circuit breaker interrupting capabilities. Because additional transmission line infeeds cannot be provided without increasing fault current levels, a TCSC was investigated for use as a fault current limiter. In order to demonstrate proper operation in the current limiting mode, Electromagnetic Transients Program (EMTP) simulations were conducted. Three TCSC configurations are presented to illustrate that additional power can be provided during normal operation without increasing fault currents at the substation: (1) series compensation of existing 138 kV infeeds (to allow higher substation MVA uprates), (2) series compensation of new 138 kV infeeds (without fault current increases), and (3) a 13.8 kV TCSC compensated link between two substations (to allow regulated power transfer between substation buses).

Godart, T.F.; Imece, A.F.; McIver, J.C. [GE Industrial and Power Systems, Schenectady, NY (United States). Power Systems Engineering Dept.; Chebli, E.A. [Consolidated Edison Co. of NY, Inc., New York, NY (United States)

1994-12-31T23:59:59.000Z

152

Feasibility of thyristor controlled series capacitor for distribution substation enhancements  

SciTech Connect (OSTI)

While Thyristor Controlled Series Capacitors (TCSCs) are already being used for control of transmission system power flows, the dynamic adjustment of transmission infeed impedances presents other system enhancement opportunities. In the case of the Con Edison system, distribution substation upgrades are severely constrained by limits to existing circuit breaker interrupting capabilities. Because additional transmission line infeeds cannot be provided without increasing fault current levels, a TCSC was investigated for use as a fault current limiter. In order to demonstrate proper operation in the current limiting mode, Electromagnetic Transients Program (EMTP) simulations were conducted. Three TCSC configurations are presented to illustrate that additional power can be provided during normal operation without increasing fault currents at the substation: (1) series compensation of existing 138 kV infeeds (to allow higher substation MVA uprates), (2) series compensation of new 138 kV infeeds (without fault current increases), and (3) a 13.8 kV TCSC compensated link between two substations (to allow regulated power transfer between substation buses).

Godart, T.F.; Imece, A.F.; McIver, J.C. [GE Industrial and Power Systems, Schenectady, NY (United States). Power Systems Engineering Dept.] [GE Industrial and Power Systems, Schenectady, NY (United States). Power Systems Engineering Dept.; Chebli, E.A. [Consolidated Edison Co. of New York Inc., New York, NY (United States)] [Consolidated Edison Co. of New York Inc., New York, NY (United States)

1995-01-01T23:59:59.000Z

153

Environmental Assessment : Happy Valley [Substation Project].  

SciTech Connect (OSTI)

The proposed Happy Valley project consists of construction of a new BPA customer service 69-kV substation south of Sequim in Clallam County, Washington. A tie line, to be constructed by the customer as part of this project, will link the new BPA facility to the existing customer's transmission system in the area. This project responds to rapid load growth in the Olympic Peninsula, and will strengthen the existing BPA system and interconnected utility systems. It will reduce transmission losses presently incurred, especially on the BPA system supplying power to the Olympic Peninsula. This report describes the potential environmental impact of the proposed actions. 2 figs., 1 tab.

United States. Bonneville Power Administration.

1982-05-01T23:59:59.000Z

154

Application and field experience of a digital substation switch  

SciTech Connect (OSTI)

There has been an increase in the use of solid-state, microprocessor-based relays, fault recorders, meters, and programmable controllers; in transmission and distribution substations. These devices can be remotely interrogated or programmed, and can send reports back to a host computer through their RS-232 communications ports. These devices use a wide variety of communications software and protocols. Because these devices can be located in the substation yard, induced surges and voltages can be present on the communication lines. This can impair the ability to communicate over RS-232 lines, and even cause equipment damage. In addition. the distance from the control house to the substation yard can limit the use of standard RS-232 protocol. For greater system economy, several devices must use the same communications channel. This requires a means of reliably connecting several devices to the incoming and outgoing communications circuits. This paper describes a digital substation switch (DSS) that was designed for this application, and its initial installation and field experience at Savannah Electric. The DSS connects various meters, transmission relays, and distribution relays to PCs in remote locations through a voice-grade telephone circuit. In this application, the DSS uses a fiber loop to communicate with the devices in the substation yard.

Spain, R.; Fodero, K.

1994-12-31T23:59:59.000Z

155

Kangley - Echo Lake Transmission Line Project Supplemental Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) is proposing to build a new transmission line to accommodate increasing demand for electricity and address reliability concerns in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmission line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as during a winter cold snap, could cause voltage instability and a loss of power in the King County area. System planners have projected total system load using normal growth in demand and determined that system instability could develop as early as the winter of 2002-03. Besides meeting this need for system reliability, this project would enhance the United States' delivery of power to Canada as required under the Columbia River Treaty of 1961. BPA described and analyzed transmission route alternatives in a draft environmental impact statement (DEIS) released in June 2001. The DEIS identified a preferred alternative that would parallel an existing BPA transmission line through the Cedar River Municipal Watershed. BPA received over 700 comments from landowners, agencies, tribes and special interest groups on the DEIS. Many of the comments suggested BPA re-evaluate the range of alternatives considered and prepare a supplemental draft environmental impact statement (SDEIS). After reviewing the comments and refining the cost estimates associated with BPA's preferred alternative, BPA decided to prepare this SDEIS to re-evaluate alternatives not analyzed in detail in the DEIS. The added transmission alternatives, all located outside of the Cedar River Watershed, were initially considered but dropped from detailed analysis. They are identified as Alternatives A, B, C, and D. Alternatives A and C are located to the west of the Cedar River Watershed boundary. Alternatives B and D cross the Mt. Baker-Snoqualmie and Okanogan-Wenatchee National Forests. Under all transmission alternatives, Echo Lake Substation would be expanded about three acres to the east and new equipment to accommodate the new line would be installed. BPA is also considering a Non-Transmission Alternative and the No Action Alternative.

N /A

2003-01-10T23:59:59.000Z

156

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Broader source: Energy.gov (indexed) [DOE]

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

157

DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (02/09/09)  

Broader source: Energy.gov (indexed) [DOE]

09 09 REPLY TO ATTN OF: KEC-4 SUBJECT: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332/SA-1) Mark Korsness, Project Manager, McNary-John Day Transmission Line Project Proposed Action: McNary-John Day Transmission Line - Review for significant new circumstances or information Proposed by: Bonneville Power Administration (BPA) Location: Umatilla and Sherman Counties, Oregon; Benton and Klickitat Counties, Washington. Background: In 2002, BPA completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. This line was proposed in early 2000 to

158

Mode conversation losses in overmolded millimeter wave transmission lines  

E-Print Network [OSTI]

Millimeter wave transmission lines are integral components for many important applications like nuclear fusion and NMR spectroscopy. In low loss corrugated transmission lines propagating the HE,1 mode with a high waveguide ...

Tax, David S. (David Samuel)

2008-01-01T23:59:59.000Z

159

EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project...  

Broader source: Energy.gov (indexed) [DOE]

5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4,...

160

EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho...  

Broader source: Energy.gov (indexed) [DOE]

7: Boardman-Hemingway Transmission Line, Oregon and Idaho EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho SUMMARY The Bureau of Land Management and the U.S. Forest...

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Dispersion-free radial transmission lines  

DOE Patents [OSTI]

A dispersion-free radial transmission line ("DFRTL") preferably for linear accelerators, having two plane conductors each with a central hole, and an electromagnetically permeable material ("EPM") between the two conductors and surrounding a channel connecting the two holes. At least one of the material parameters of relative magnetic permeability, relative dielectric permittivity, and axial width of the EPM is varied as a function of radius, so that the characteristic impedance of the DFRTL is held substantially constant, and pulse transmission therethrough is substantially dispersion-free. Preferably, the EPM is divided into concentric radial sections, with the varied material parameters held constant in each respective section but stepwise varied between sections as a step function of the radius. The radial widths of the concentric sections are selected so that pulse traversal time across each section is the same, and the varied material parameters of the concentric sections are selected to minimize traversal error.

Caporaso, George J. (Livermore, CA); Nelson, Scott D. (Patterson, CA)

2011-04-12T23:59:59.000Z

162

Online Transmission Line Loadability Assessment Using Synchrophasor Measurements  

E-Print Network [OSTI]

Online Transmission Line Loadability Assessment Using Synchrophasor Measurements Jiangmeng Zhang}@illinois.edu Abstract--This paper proposes a measurement-based method to assess transmission line loadability a stable operation. Transmission line loading limits are also essential to deter- mine locational marginal

Liberzon, Daniel

163

New approach for modelling distributed MEMS transmission lines  

E-Print Network [OSTI]

New approach for modelling distributed MEMS transmission lines K. Topalli, M. Unlu, S. Demir, O for the distributed MEMS transmission line (DMTL) structures. In this new model, the MEMS bridges that are used as the loading elements of the DMTL structures are represented as low-impedance transmission lines, rather than

Akin, Tayfun

164

Experimental characterisations of thin film transmission line losses  

E-Print Network [OSTI]

Experimental characterisations of thin film transmission line losses D. Kim, H. Kim and Y. Eo New frequency-variant losses of planar thin film transmission lines are experimentally investigated in a broad frequency range. The fre- quency-variant transmission line parameters are accurately determined

165

Optimized Waveform Relaxation Solution of RLCG Transmission Line Type Circuits  

E-Print Network [OSTI]

Optimized Waveform Relaxation Solution of RLCG Transmission Line Type Circuits Mohammad D. Al to transmission line circuit problems based on the longitudinal partitioning into segments. This greatly improves the convergence for strongly coupled RLCG transmission line (TL) type circuits. The method can be applied to other

Gander, Martin J.

166

Using Transmission Lines for Global On-Chip Communication  

E-Print Network [OSTI]

1 Using Transmission Lines for Global On-Chip Communication Aaron Carpenter, Jianyun Hu, Jie Xu-switched network-on-chip a less attractive option. An alternative solution uses well-engineered transmission lines as communication links. These transmission lines, along with simple, practical circuits using modern CMOS technol

Huang, Michael C.

167

Transmission Line Boundary Protection Using Wavelet Transform and Neural Network  

E-Print Network [OSTI]

1 Transmission Line Boundary Protection Using Wavelet Transform and Neural Network Nan Zhang of transmission line protection are: a) differentiating precisely the internal faults from external, and b is verified using frequency-dependent transmission line model and the test results prove its enhanced

168

EXTENSION OF THE TRANSMISSION LINE THEORY APPLICATION WITH MODIFIED  

E-Print Network [OSTI]

1 EXTENSION OF THE TRANSMISSION LINE THEORY APPLICATION WITH MODIFIED ENHANCED PER introduces a modified enhanced transmission-line theory to account for higher-order modes while using a standard transmission line equation solver or equivalently a Baum, Liu and Tesche (BLT) equation solver

Paris-Sud XI, Université de

169

Asymmetric parametric amplification in nonlinear left-handed transmission lines  

E-Print Network [OSTI]

Asymmetric parametric amplification in nonlinear left-handed transmission lines David A. Powell amplification in nonlinear left-handed transmission lines, which serve as model systems for nonlinear negative-handed regime. © 2009 American Institute of Physics. DOI: 10.1063/1.3089842 Left-handed transmission lines

170

Transmission line including support means with barriers  

DOE Patents [OSTI]

A gas insulated transmission line includes an elongated outer sheath, a plurality of inner conductors disposed within and extending along the outer sheath, and an insulating gas which electrically insulates the inner conductors from the outer sheath. A support insulator insulatably supports the inner conductors within the outer sheath, with the support insulator comprising a main body portion including a plurality of legs extending to the outer sheath, and barrier portions which extend between the legs. The barrier portions have openings therein adjacent the main body portion through which the inner conductors extend.

Cookson, Alan H. (Pittsburgh, PA)

1982-01-01T23:59:59.000Z

171

Transmission line route selection by goal programming  

Science Journals Connector (OSTI)

A two-stage solution for transmission line route selection is presented. The generalized double-sweep method has been used to select the K least costly routes. The selected routes are subjected to social and environmental constraints (SEC). The SEC problem is formulated as a zero-one goal-programming model and solved by the implicit enumeration method. The two-stage solution algorithm has been applied to two problems. The results indicate the suitability of the method for route selection provided that acceptable SEC criteria can be found. The results also indicate the viability of the goal-programming technique for choosing power network interconnection concepts.

I.M. Elamin; S.O. Duffuaa; H.A. Yassein

1990-01-01T23:59:59.000Z

172

Transmission Line Structure Spotting and Optimization within a Defined Transmission Line Routing Centerline Using Non-Linear Programming Models  

E-Print Network [OSTI]

and optimize structure heights for overhead transmission lines. The modeling tool will address common problems in determining overhead transmission line structure heights and locations. Some of the common problems consist of structure locations often having...

Cockrum, Joshua W.

2010-05-14T23:59:59.000Z

173

Multi-transmission-line-beam interactive system  

SciTech Connect (OSTI)

We construct here a Lagrangian field formulation for a system consisting of an electron beam interacting with a slow-wave structure modeled by a possibly non-uniform multiple transmission line (MTL). In the case of a single line we recover the linear model of a traveling wave tube due to J. R. Pierce. Since a properly chosen MTL can approximate a real waveguide structure with any desired accuracy, the proposed model can be used in particular for design optimization. Furthermore, the Lagrangian formulation provides: (i) a clear identification of the mathematical source of amplification, (ii) exact expressions for the conserved energy and its flux distributions obtained from the Noether theorem. In the case of uniform MTLs we carry out an exhaustive analysis of eigenmodes and find sharp conditions on the parameters of the system to provide for amplifying regimes.

Figotin, Alexander; Reyes, Guillermo [Department of Mathematics, University of California at Irvine, Irvine, California 92697-3875 (United States)] [Department of Mathematics, University of California at Irvine, Irvine, California 92697-3875 (United States)

2013-11-15T23:59:59.000Z

174

Giant vacuum forces via transmission lines  

E-Print Network [OSTI]

Quantum electromagnetic fluctuations induce forces between neutral particles, known as the van der Waals (vdW) and Casimir interactions. These fundamental forces, mediated by virtual photons from the vacuum, play an important role in basic physics and chemistry, and in emerging technologies involving, e.g. micro-electromechanical systems or quantum information processing. Here we show that these interactions can be enhanced by many orders of magnitude upon changing the character of the mediating vacuum-modes. By considering two polarizable particles in the vicinity of any standard electric transmission line, along which photons can propagate in one dimension (1d), we find a much stronger and longer-range interaction than in free-space. This enhancement may have profound implications on many-particle and bulk systems, and impact the quantum technologies mentioned above. The predicted giant vacuum force is estimated to be measurable in a coplanar waveguide line.

Ephraim Shahmoon; Igor Mazets; Gershon Kurizki

2013-04-07T23:59:59.000Z

175

Multi-transmission-line-beam interactive system  

E-Print Network [OSTI]

We construct here a Lagrangian field formulation for a system consisting of an electron beam interacting with a slow-wave structure modeled by a possibly non-uniform multiple transmission line (MTL). In the case of a single line we recover the linear model of a traveling wave tube (TWT) due to J.R. Pierce. Since a properly chosen MTL can approximate a real waveguide structure with any desired accuracy, the proposed model can be used in particular for design optimization. Furthermore, the Lagrangian formulation provides for: (i) a clear identification of the mathematical source of amplification, (ii) exact expressions for the conserved energy and its flux distributions obtained from the Noether theorem. In the case of uniform MTLs we carry out an exhaustive analysis of eigenmodes and find sharp conditions on the parameters of the system to provide for amplifying regimes.

Alexander Figotin; Guillermo Reyes

2013-04-19T23:59:59.000Z

176

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

177

Marion Industrial Substation Project : Environmental Assessment.  

SciTech Connect (OSTI)

Consumers Power, Inc. (CPI), proposes to construct a new distribution substation under the existing Bonneville Power Administration (BPA) Albay-Lebanon transmission line near the city of Albany in Linn County, Oregon. BPA is proposing to grant a new Point of Delivery to CPI at this substation. The purpose of the project is to serve the developing industrial needs in the Marion Industrial Park and on the 550 acres of nearby land within CPI's service area that are zoned for residential use. CPI prepared, and the Rural Electrification Administration (REA) has approved a Borrower's Environmental Report (BER) which addresses this action along with several other proposed projects in the CPI service area. Portions of this BER are summarized in this brief EA. BPA is preparing its own EA since Department of Energy National Environmental Policy Act (NEPA) guidelines require additional environmental concerns to be addressed than are required by REA's NEPA guidelines.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

178

Marion Industrial Substation Project : Environmental Assessment.  

SciTech Connect (OSTI)

Consumers Power, Inc. (CPI), proposes to construct a new distribution substation under the existing Bonneville Power Administration (BPA) Albay-Lebanon transmission line near the city of Albany in Linn County, Oregon. BPA is proposing to grant a new Point of Delivery to CPI at this substation. The purpose of the project is to serve the developing industrial needs in the Marion Industrial Park and on the 550 acres of nearby land within CPI`s service area that are zoned for residential use. CPI prepared, and the Rural Electrification Administration (REA) has approved a Borrower`s Environmental Report (BER) which addresses this action along with several other proposed projects in the CPI service area. Portions of this BER are summarized in this brief EA. BPA is preparing its own EA since Department of Energy National Environmental Policy Act (NEPA) guidelines require additional environmental concerns to be addressed than are required by REA`s NEPA guidelines.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

179

Method for bonding a transmission line to a downhole tool  

DOE Patents [OSTI]

An apparatus for bonding a transmission line to the central bore of a downhole tool includes a pre-formed interface for bonding a transmission line to the inside diameter of a downhole tool. The pre-formed interface includes a first surface that substantially conforms to the outside contour of a transmission line and a second surface that substantially conforms to the inside diameter of a downhole tool. In another aspect of the invention, a method for bonding a transmission line to the inside diameter of a downhole tool includes positioning a transmission line near the inside wall of a downhole tool and placing a mold near the transmission line and the inside wall. The method further includes injecting a bonding material into the mold and curing the bonding material such that the bonding material bonds the transmission line to the inside wall.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2007-11-06T23:59:59.000Z

180

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Nonlinear transmission line based electron beam driver  

SciTech Connect (OSTI)

Gated field emission cathodes can provide short electron pulses without the requirement of laser systems or cathode heating required by photoemission or thermionic cathodes. The large electric field requirement for field emission to take place can be achieved by using a high aspect ratio cathode with a large field enhancement factor which reduces the voltage requirement for emission. In this paper, a cathode gate driver based on the output pulse train from a nonlinear transmission line is experimentally demonstrated. The application of the pulse train to a tufted carbon fiber field emission cathode generates short electron pulses. The pulses are approximately 2 ns in duration with emission currents of several mA, and the train contains up to 6 pulses at a frequency of 100 MHz. Particle-in-cell simulation is used to predict the characteristic of the current pulse train generated from a single carbon fiber field emission cathode using the same technique.

French, David M.; Hoff, Brad W.; Tang Wilkin; Heidger, Susan; Shiffler, Don [Directed Energy Directorate, Air Force Research Laboratory, Kirtland AFB, New Mexico 87117 (United States); Allen-Flowers, Jordan [Program in Applied Mathematics, University of Arizona, Tucson, Arizona 85721 (United States)

2012-12-15T23:59:59.000Z

182

Enhanced Transmission Line Theory: Frequency-Dependent Line Parameters And Their Insertion in a  

E-Print Network [OSTI]

Enhanced Transmission Line Theory: Frequency- Dependent Line Parameters And Their Insertion in a Classical Transmission Line Equation Solver S. Chabane, P. Besnier IETR: Institute of Electronics--In this paper, a modified enhanced transmission- line theory taking into account higher-order modes is described

Paris-Sud XI, Université de

183

Proposed amendment for Presidential Permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada Northern States Power Company. Final Environmental Assessment  

SciTech Connect (OSTI)

Northern States Power Company, (NSP), a Minnesota investor owned utility has applied to the Office of Fossil Energy, United States Department of Energy, to amend Presidential Permit PP-63 to allow for alterations to the 500 kV transmission line and as sedated facilities currently regulated by this permit. The alterations proposed for the 500 kV line owned by NSP are part of a long term effort sponsored by NSP to upgrade the existing NSP transmission system to allow for increased exchange of electricity with the Manitoba Hydro-Electric Board. Presidential Permit PP-63 authorized NSP to construct, connect, operate and maintain a 500 kV line at the United States/Canadian border approximately seven-and-a-half miles west of Warroad in Roseau County, Minnesota. This line connects with a 500 kV line owned and operated by the Manitoba Hydro-Electric Board (MHEB), which extends from Dorsey, Manitoba, Canada to the United States/Canadian border. NSP proposes to increase the electricity transfer capability of this transmission facility by constructing a new 80-acre substation on the existing 500 kV line in Roseau County, Minnesota, and upgrading the existing substation at Forbes, Minnesota. The proposed Roseau substation would contain two 41.5 ohm series capacitor banks. In addition, static VAR compensators are to be installed at the existing Forbes Substation. Approximately 5 acres would be added to the 30-acre Forbes site to house the additional equipment. No new lines would enter or exit the facility. NSP proposes to place the new Roseau Substation in service in May 1993 and to complete the upgrading of the Forbes Substation in March 1994. The primary, initial purpose of these modifications is to enable NSP to import 400 megawatts of electric power from MHEB during the summer months to meet peak electrical demand in the Minneapolis-St. Paul area. It is expected that this power transfer would begin in 1993.

Not Available

1992-02-01T23:59:59.000Z

184

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

185

Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

S-1 S-1 Summary This summary covers the major points of the draft environmental impact statement (DEIS) prepared for the Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project (Libby-Troy Project). This DEIS was prepared by Bonneville Power Administration (BPA). The project would include rebuilding a 17-mile section of an existing BPA transmission line located between Libby and Troy, Montana. S.1 Purpose of and Need for Action Historically, BPA has served electrical loads in northwestern Montana and northern Idaho with transmission facilities from Libby Dam east of Libby, Montana through Bonners Ferry Substation west of Bonners Ferry, Idaho to Albeni Falls Dam near the Idaho-Washington border (Figure S-1). These

186

Monte Carlo method for estimating backflashover rates on high voltage transmission lines  

Science Journals Connector (OSTI)

Abstract This paper presents a novel Monte-Carlo based model for the analysis of backflashover rate (BFOR) on high voltage transmission lines. The proposed model aims to take into the account following aspects of the BFOR phenomenon: transmission line (TL) route keraunic level(s), statistical depiction of lightning-current parameters (including statistical correlation), electrogeometric model of lightning attachment, frequency-dependence of TL parameters and electromagnetic coupling effects, tower geometry and surge impedance, tower grounding impulse impedance (with soil ionization), lightning-surge reflections from adjacent towers, non-linearity of the insulator strings flashover characteristic, distribution of lightning strokes along the TL span and power frequency voltage. In the analysis of the BFOR, special attention is given to the influences emanating from the insulator strings flashover characteristic and lightning statistics. The model could be applied to the transmission line as a whole or some of its portions, e.g. first several towers emanating from the substation or several towers crossing a mountain ridge.

Petar Sarajcev

2015-01-01T23:59:59.000Z

187

EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada |  

Broader source: Energy.gov (indexed) [DOE]

60: Townsite Solar Project Transmission Line, Clark County, 60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 28, 2013 EA-1960: Finding of No Significant Impact Townsite Solar Project Transmission Line, Clark County, Nevada June 28, 2013 EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada

188

Radio frequency communication system utilizing radiating transmission lines  

DOE Patents [OSTI]

A radio communication system for use in tunnels, mines, buildings or other shielded locations in which a pair of radiating transmission lines (30), (31) extend through such location in spaced coextensive relation to each other. Each transmission line (30), (31) has at least one unidirectional amplifier (32), (33) interposed therein with the sense of the unidirectional amplifier (32) of one transmission line (30) being opposite to the sense of the unidirectional amplifier (33) of the other transmission line (31). Each of the amplifiers (32), (33) has a gain which is less than the coupling loss between the transmission lines (30), (31). Two or more mobile transceivers (35) in the location served by the system are coupled to the transmission lines (30), (31) by electromagnetic wave propagation in space in order to communicate directly with each other at a given radio frequency within the frequency range of the system.

Struven, Warren C. (San Carlos, CA)

1984-01-01T23:59:59.000Z

189

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Description New 500 kV substation into Southwest PowerlinkLine Expand Midpoint Substation and construct thirdto Kramer Jct. and Lugo Substation 2010 20% RPS target with

Mills, Andrew D.

2009-01-01T23:59:59.000Z

190

Notice of Availability of Plains & Eastern Clean Line Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Notice of Availability of Plains & Eastern Clean Line Transmission Project Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume 79, No. 242 -...

191

The impact on transmission line terminations on radiated emissions.  

E-Print Network [OSTI]

??Terminating transmission lines at either the source or the load end with a damping resistor is frequently used to improve the signal integrity of clock… (more)

Wong, Wei-Juet

2007-01-01T23:59:59.000Z

192

Millimeter wave interconnect and slow wave transmission lines in CMOS.  

E-Print Network [OSTI]

??When heading into the millimeter wave frequency band, even wires on CMOS exhibit transmission line effects, this thesis therefore presents models, simulation and measurements for… (more)

Bjørndal, Øystein

2013-01-01T23:59:59.000Z

193

NEW ACCURATE FAULT LOCATION ALGORITHM FOR PARALLEL TRANSMISSION LINES.  

E-Print Network [OSTI]

??Electric power systems have been in existence for over a century. Electric power transmission line systems play an important role in carrying electrical power to… (more)

Chaiwan, Pramote

2011-01-01T23:59:59.000Z

194

Numerical and Experimental Studies of Transmission Lines Subjected to Tornadoes.  

E-Print Network [OSTI]

??The majority of worldwide weather-related transmission line failures have been attributed to High Intensity Wind (HIW) events in the form of tornadoes and downbursts. The… (more)

Hamada, Ahmed

2014-01-01T23:59:59.000Z

195

A TEM horn radiator for a nonlinear transmission line.  

E-Print Network [OSTI]

??A nonlinear transmission line (NLTL) provides a solid-state means of generating high power, microwave pulses. Although the design and construction of an NLTL is rather… (more)

Simmons, Christopher

2014-01-01T23:59:59.000Z

196

EIS-0317: Kangley-Echo Lake Transmission Line Project  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

197

High voltage overhead long transmission line design and fault analysis.  

E-Print Network [OSTI]

??The goal of this project is to design a reliable high voltage overhead long transmission line that satisfies specific design criteria including voltage regulation, efficiency,… (more)

Elzain, Mohamed Ali

2011-01-01T23:59:59.000Z

198

Sun Valley to Morgan Transmission Line | Open Energy Information  

Open Energy Info (EERE)

to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: Sun Valley to Morgan Transmission Line EIS at na for na Environmental Impact Statement...

199

Appendix S-51 - Transmission Line Approval - Public Utilities...  

Open Energy Info (EERE)

Transmission Line Approval - Public Utilities Commission Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Instructions: Appendix...

200

Guide to Permitting Electric Transmission Lines in Wyoming |...  

Open Energy Info (EERE)

Permitting Electric Transmission Lines in Wyoming Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Guide to...

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Hawaii Clean Energy Initiative - Transmission Line Approval Permit...  

Open Energy Info (EERE)

Hawaii Clean Energy Initiative - Transmission Line Approval Permit Packet Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

202

500 kV transmission line design and fault analysis.  

E-Print Network [OSTI]

??To be able to keep up with energy demands new transmission lines need to be designed and built. Design and planning is a long process… (more)

Haskovic, Mensur

2012-01-01T23:59:59.000Z

203

The high-voltage substation configuration influence on the estimated lightning performance  

Science Journals Connector (OSTI)

The substation configuration has a great influence on the ... at the lines connected in front of the substations. In most of the analyses the critical substation configuration is assumed with only one connected ....

Z. Stojkovi?; M. S. Savi?

1997-08-01T23:59:59.000Z

204

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Broader source: Energy.gov (indexed) [DOE]

7: Champlain Hudson Power Express Transmission Line Project, 7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City. Public Comment Opportunities None available at this time. Documents Available for Download December 6, 2013 EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York

205

Flatiron-Erie 115kV transmission line project, Larimer, Weld and Boulder Counties, Colorado. Draft environmental impact statement  

SciTech Connect (OSTI)

Western Area Power Administration (Western) proposes to uprate its existing 115-kV Flatiron-Erie transmission line. The line is located in Larimer, Weld and Boulder Counties, Colorado, and passes through the City of Longmont. The line connects Flatiron Substation and several of the substations supplying Longmont. It is a single circuit 115-kV line, 31.5 miles long, and was built in 1950-51 on a 75-foot wide right-of-way (ROW) using wood H-frame structures. Western proposes to build 27 new structures along the line, to replace or modify 45 of the existing structures and to remote 11 of them. Many of these additions and changes would involve structures that are approximately 5 to 15 feet taller than the existing ones. The existing conductors and ground wires would remain in place. The purpose of these actions would be to allow the power carrying capability of the line to be increased and to replace deteriorating/structural members. Western would be the sole participant in the proposed project. This report gives an analysis of the study area environment and the development of alternative routes. An assessment is presented of the impacts of the primary alternative routes. The environmental consequences of this project are addressed.

Not Available

1993-05-01T23:59:59.000Z

206

Substation grounding programs  

SciTech Connect (OSTI)

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. This report, Volume 3, is a users manual and an installation and validation manual for the computer program SGSYS (Substation Grounding SYStem Analysis Program). This program analyzes the substation ground field given the total electric current injected into the ground field and the design of the grounding system. Standard outputs of the program are (1) total ground resistance, (2) step voltage, (3) touch voltage, (4) voltages on a grid of points, (5) voltage profile along straight lines, (6) transfer voltages, (7) ground potential rise, (8) body currents, (9) step voltage profile along straight lines, and (10) touch voltage profile along straight lines. This program can be utilized in an interactive or batch mode. In the interactive mode, the user defines the grounding system geometry, soil parameters, and output requests interactively, with the use of a user friendly conversational program. The users manual describes data requirements and data preparation procedures. An appendix provides forms which facilitate data collection procedures. The installation and validation manual describes the computer files which make up the program SGSYS and provides a test case for validation purposes.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

207

Nondestructive Testing of Overhead Transmission Lines: Numerical and Experimental Investigation  

E-Print Network [OSTI]

Overhead transmission lines are periodically inspected using both on-ground and helicopter-aided visual inspection. Factors including sun glare, cloud cover, close proximity to power lines and the rapidly changing visual circumstances make airborne...

Kulkarni, Salil Subhash

2011-02-22T23:59:59.000Z

208

Radio-Frequency Inverters With Transmission-Line Input Networks  

E-Print Network [OSTI]

A soft-switching inverter topology (the Class Phi ) is presented which draws dc source current through a transmission line or a lumped-network approximation of a distributed line. By aligning the inverter switching frequency ...

Phinney, Joshua W.

209

Construction of transmission lines above valuable standing timber  

Science Journals Connector (OSTI)

Problems with the construction of transmission lines above a forest are examined. Construction of lines above standing timber makes it possible to shorten the length of the route, eliminate the clearing of a cont...

L. O. Aizenberg; E. A. Khvoles

2007-11-01T23:59:59.000Z

210

Definition: Transmission Line Monitoring System | Open Energy Information  

Open Energy Info (EERE)

Monitoring System Monitoring System Jump to: navigation, search Dictionary.png Transmission Line Monitoring System Hardware, software, including sensors for voltage, current, temperature, mechanical load, wind speed, or other electrical or environmental parameters, including synchrophasors. These systems are designed to provide precise information that determine the operating conditions and ratings of transmission lines. Such a system can monitor line conditions and alert grid operators of trouble.[1] Related Terms transmission lines, transmission line References ↑ https://www.smartgrid.gov/category/technology/transmission_line_monitoring_system [[Ca LikeLike UnlikeLike You like this.Sign Up to see what your friends like. tegory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid,

211

Florida Electric Transmission Line Siting Act (Florida) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission Line Siting Act (Florida) Electric Transmission Line Siting Act (Florida) Florida Electric Transmission Line Siting Act (Florida) < Back Eligibility Commercial Construction Developer Fed. Government Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection The Transmission Line Siting Act (TLSA) is the state's centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15 miles or longer. An

212

BPA, transmission, I-5 Corridor Reinforcement Project, letter...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

made to the PEP form and how they affect any rights you may or have granted. Background - BPA is proposing to build a 500-kilovolt transmission line and associated substations. The...

213

BPA, Transmission, I-5 Corridor Reinforcement Project, abbreviated...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Project 500-kilovolt transmission New substations at - Castle Rock, Wash. - Troutdale, Ore. 70 miles apart Many route segments 9 Benefits of a new line Keeps the lights...

214

EIS-0496: San Luis Transmission Project, Alameda, Merced, San...  

Energy Savers [EERE]

proposes at a minimum to construct, own, operate, and maintain a new 230-kilovolt (kV) transmission line about 62 miles in length between Western's Tracy Substation and...

215

Grounding Analysis in Heterogeneous Soil Models: Application to Underground Substations  

E-Print Network [OSTI]

Grounding Analysis in Heterogeneous Soil Models: Application to Underground Substations Ignasi category includes all step- up and step-down transmission substations, as well as a number of distribution substations indeed. Nevertheless, the current trend in electric power Engineering moves in another direction

Colominas, Ignasi

216

Comments on RFI on Permitting of Transmission Lines Available | Department  

Broader source: Energy.gov (indexed) [DOE]

Comments on RFI on Permitting of Transmission Lines Available Comments on RFI on Permitting of Transmission Lines Available Comments on RFI on Permitting of Transmission Lines Available April 3, 2012 - 2:12pm Addthis On October 5, 2011, the White House announced the creation of a Rapid Response Team for Transmission (RRTT). In support of the RRTT the Department of Energy's Office of Electricity Delivery and Energy Reliability released a Federal Register Notice seeking information on questions related to permitting of transmission lines. The Request for Information focused on making the development times for generation and transmission more commensurate with one another. Public comments received from the following organizations are now available for review and downloading. - Allegheny Highlands Alliance - American Electric Power

217

Green Power Transmission Line Given New Life | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Green Power Transmission Line Given New Life Green Power Transmission Line Given New Life Green Power Transmission Line Given New Life March 11, 2010 - 4:34pm Addthis Poles for the Montana-Alberta Tie Line are unloaded outside Shelby, Mont. | Photo courtesy of Tonbridge Power Poles for the Montana-Alberta Tie Line are unloaded outside Shelby, Mont. | Photo courtesy of Tonbridge Power Stephen Graff Former Writer & editor for Energy Empowers, EERE Thanks to funds from the American Recovery and Reinvestment Act, construction of a green power transmission line stretching from Lethbridge, Alberta in Canada, down to Great Falls, Mont., was put back on track after a bank failure. Currently under construction, the Montana-Alberta Tie Line, which is owned by Toronto-based Tonbridge Power, will connect the electricity markets of

218

EIS-0101: Thermopolis, Alcova, Casper Transmission Line Project  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this statement to evaluate the environmental impacts of constructing, operating and maintaining a 230-kilovolt transmission line between Thermopolis, Wyoming, and Alcova, Wyoming, and a 230/345-kilovolt transmission line between Alcova, Wyoming, and Casper, Wyoming.

219

The implementation of substation automation coordinated with numerical protection relaying  

SciTech Connect (OSTI)

During 1987 Eskom embarked on a process of defining user requirements in the area of substation control. This ultimately resulted in a project being established for the procurement and development of a new generation of substation control equipment. At the same time it was decided to establish a new generation of protection schemes for transmission substations, based on numerical protection relays. From the outset, a high degree of coordination was planned between the substation control and protection equipment. Development contracts were placed with suppliers during late 1990 for the protection schemes and during early 1991 for the substation control equipment. These contracts are nearing completion and the first large installations will commence during 1994. The Transmission Group has committed to employing this new technology in all new substations and all substations to be refurbished. This paper discusses the concept of coordinated substation control and protection and gives insight into implementation issues and functional compromises which had to be made to meet project deadlines.

Welie, G. van; Carolin, T.

1994-12-31T23:59:59.000Z

220

Voltage asymmetry at the buses of a combined substation  

Science Journals Connector (OSTI)

The voltage asymmetry at the buses of a combined (ac/dc) substation is calculated by phase method, using Mathcad ... , power may be supplied to a combined substation along a common line from a limited-...

A. G. Pakulin; V. A. Zagorskii; V. F. Put’ko

2013-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

TEP Sahuarita-Nogales Transmission Line Final EIS TEP Sahuarita-Nogales Transmission Line Final EIS 2-4 Figure 2.1-1. Close-up of Alternative Study Corridors Near Sahuarita and Green Valley. Chapter 2- Proposed Action and Alternatives 2-5 Figure 2.1-2. Close-up of Alternative Study Corridors Near Amado. TEP Sahuarita-Nogales Transmission Line Final EIS 2-6 Figure 2.1-3. Close-up of Alternative Study Corridors Near Nogales. TEP Sahuarita-Nogales Transmission Line Final EIS 2-8 Figure 2.1-4. Western Corridor on the Coronado National Forest. Chapter 2-Proposed Action and Alternatives 2-13 Figure 2.1-5. Central Corridor on the Coronado National Forest. Chapter 2-Proposed Action and Alternatives 2-15 Figure 2.1-6. Crossover Corridor on the Coronado National Forest. TEP Sahuarita-Nogales Transmission Line Final EIS

222

Northern Pass Transmission Line Project Environmental Impact Statement:  

Broader source: Energy.gov (indexed) [DOE]

Northern Pass Transmission Line Project Environmental Impact Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 DOE has changed the location of the September 26 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. On September 6, 2013, the U.S. Department of Energy (DOE) published in the Federal Register an amended Notice of Intent (NOI) to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement

223

Transmission-Line Metamaterial Design of an Embedded Line Source in a Ground Recess.  

E-Print Network [OSTI]

??A transmission-line metamaterial design of a material-embedded electric line source radiating inside a ground recess is investigated. The media embedding the recessed line source are… (more)

EMIROGLU, CAGLAR D

2011-01-01T23:59:59.000Z

224

E-Print Network 3.0 - ac transmission lines Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

lines Search Powered by Explorit Topic List Advanced Search Sample search results for: ac transmission lines...

225

E-Print Network 3.0 - ac transmission line Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

line Search Powered by Explorit Topic List Advanced Search Sample search results for: ac transmission line...

226

Hyperreal Waves on Transfinte, Terminated, Distortionless and Lossless, Transmission Lines  

E-Print Network [OSTI]

A prior work (see Chapter 8 of the book, ``Graphs and Networks: Transfinite and Nonstandard,'' Birkhauser-Boston, Cambridge, Mass., USA, 2004) examined the propagation of an electromagnetic wave on a transfinite transmission line, transfinite in the sense that infinitely many one-way infinite transmission lines are connected in cascade. That there are infinitely many such one-way infinite lines results in the wave propagating without ever reflecting at some discontinuity. The present work examines the cascade where the cascade terminates after only finitely many one-way infinite transmission lines, with the result that reflected waves are now produced at both the far end as well as at the initial end of the transfinite transmission line. The question of whether the reflected waves are infini tesimal or appreciable and whether they sum to an infinitesimal or appreciable amount are resolved for both distortionless and lossless lines. Finally, the generalizations to higher ranks of transfiniteness is briefly summarized.

A. H. Zemanian

2004-06-10T23:59:59.000Z

227

Scoping study: Substation design workstation  

SciTech Connect (OSTI)

This project conducted a survey, consisting of a written questionaire, a workshop, and site visits to determine what facets of substation engineering would benefit from incorporation into a workstation environment. Based on the needs expressed by the respondents, a program for the staged development of a Substation Workstation is recommended. Six analytical function modules for assisting in substation engineering were identified for potential inclusion in the workstation: Initial Planning Activities; Physical Plant Design; Analytical Functions; Civil/Structural Design; Environmental Design; and Project Management. The initial release of the Substation Workstation is recommended to include the workstation environment (including MENTOR -- a concept for on-line help, tutorials, notepad, a minor spreadsheet, and interfaces to other regular desktop functions) and portions of the first three functional modules listed above. Recommendations for progress beyond this first release of the workstation included the development of additional capabilities within the initial functional modules, as well as the development of the remaining modules. An overlap exists between the analytical requirements for this workstation and those already included in the EPRI TLWorkstation and the ICWorkstation. In some cases, elements of these other workstations are also suggested for incorporation into the Substation Workstation (such as the foundation analyses from the TLWorkstation), and in others, an assimilation of the other workstation into the Substation Workstation is recommended (as with the ICWorkstation). Estimated resources for implementing the recommended program, including both costs and development time, are also provided.

Mauser, S.F. (Power Technologies, Inc., Wilmerding, PA (United States)); Conroy, M.W. (Sargent and Lundy, Chicago, IL (United States)); Singh, N.M. (Power Computing, Dallas, TX (United States))

1993-03-01T23:59:59.000Z

228

Request for Information on Permitting of Transmission Lines: Federal  

Broader source: Energy.gov (indexed) [DOE]

Request for Information on Permitting of Transmission Lines: Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 The Department of Energy's Office of Electricity Delivery and Energy Reliability requested information on questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion

229

DOE Seeking Information on Transmission Line Permitting | Department of  

Broader source: Energy.gov (indexed) [DOE]

Seeking Information on Transmission Line Permitting Seeking Information on Transmission Line Permitting DOE Seeking Information on Transmission Line Permitting February 27, 2012 - 3:25pm Addthis The Department of Energy's Office of Electricity Delivery and Energy Reliability is seeking information on the questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local, and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion projects of national and regional significance. This Request for

230

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

447: Champlain Hudson Power Express Transmission Line Project, 447: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line will run from the Canadian Province of Quebec to New York City. DOE also published a notice correcting the location of the public hearing that was held on November 19, 2013. Public Comment Opportunities As of December 6, 2013 - Comment Period Extended through 1/15/14 Written comments must be received by January 15, 2014. Comments submitted

231

Request for Information on Permitting of Transmission Lines: Federal  

Broader source: Energy.gov (indexed) [DOE]

Request for Information on Permitting of Transmission Lines: Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 The Department of Energy's Office of Electricity Delivery and Energy Reliability requested information on questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion

232

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana  

Broader source: Energy.gov [DOE]

This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations.

233

EIS-0100: Liberty-Coolidge 230-kV Transmission Line, Arizona  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with an upgrade of electrical transmission capability between the Liberty and Coolidge Substations.

234

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

235

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. Additional information is available at the project...

236

EIS-0106: Great Falls-Conrad Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

237

Single transmission line interrogated multiple channel data acquisition system  

DOE Patents [OSTI]

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensor circuits each monitors a specific process variable and each transmits measurement values over a single transmission line to a master interrogating station when addressed by said master interrogating station. Typically, as many as 330 remote stations may be parallel connected to the transmission line which may exceed 7,000 feet. The interrogation rate is typically 330 stations/second. The master interrogating station samples each station according to a shared, charging transmit-receive cycle. All remote station address signals, all data signals from the remote stations/sensors and all power for all of the remote station/sensors are transmitted via a single continuous terminated coaxial cable. A means is provided for periodically and remotely calibrating all remote sensors for zero and span. A provision is available to remotely disconnect any selected sensor station from the main transmission line.

Fasching, George E. (Morgantown, WV); Keech, Jr., Thomas W. (Morgantown, WV)

1980-01-01T23:59:59.000Z

238

EIS-0499: Great Northern Transmission Line Project, Minnesota  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 750-megawatt electric transmission system across the U.S.-Canada border. The proposed 220 mile transmission line would cross the border near Roseau, Minnesota, and continue to Grand Rapids, Minnesota.

239

Electrical and Biological Effects of Transmission Lines: A Review.  

SciTech Connect (OSTI)

This review describes the electrical properties of a-c and d-c transmission lines and the resulting effects on plants, animals, and people. Methods used by BPA to mitigate undesirable effects are also discussed. Although much of the information in this review pertains to high-voltage transmission lines, information on distribution lines and electrical appliances is included. The electrical properties discussed are electric and magnetic fields and corona: first for alternating-current (a-c) lines, then for direct current (d-c).

Lee, Jack M.

1989-06-01T23:59:59.000Z

240

Neural net application to transmission line fault detection and classification  

E-Print Network [OSTI]

NEURAL NET APPLICATION TO TRANSMISSION LINE FAULT DETECTION AND CLASSIFICATION A Thesis by IGOR RIKALO Submitted to Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE Approve as to style... Applicanon to Transmission Line Fault Detection and Classification. (December 1994) Igor Rikalo, B. S. University of Sarajevo Chair of Advisory Committee: Dr. Mladen Kezunovic Today, in electric power systems, a large amount of data is made readily...

Rikalo, Igor

2012-06-07T23:59:59.000Z

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho  

Broader source: Energy.gov [DOE]

The Bureau of Land Management and the U.S. Forest Service are preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct about 305 miles of 500-kV transmission line from northeast Oregon to southwest Idaho. BPA’s proposed action is to partially fund part the transmission line. Additional information is available at www.boardmantohemingway.com.

242

Corrugated outer sheath gas-insulated transmission line  

DOE Patents [OSTI]

A gas-insulated transmission line includes two transmission line sections each of which are formed of a corrugated outer housing enclosing an inner high-voltage conductor disposed therein, with insulating support means supporting the inner conductor within the outer housing and an insulating gas providing electrical insulation therebetween. The outer housings in each section have smooth end sections at the longitudinal ends thereof which are joined together by joining means which provide for a sealing fixed joint.

Kemeny, George A. (Pittsburgh, PA); Cookson, Alan H. (Churchill Boro, PA)

1981-01-01T23:59:59.000Z

243

Gas insulated transmission line having tapered particle trapping ring  

DOE Patents [OSTI]

A gas-insulated transmission line includes an outer sheath, an inner conductor, insulating supports and an insulating gas. A particle-trapping ring is secured to each insulating support, and it is comprised of a central portion and two tapered end portions. The ends of the particle trapping ring have a smaller diameter than the central portion of the ring, so as to enable the use of the particle trapping ring in a curved transmission line.

Cookson, Alan H. (Pittsburgh, PA)

1982-01-01T23:59:59.000Z

244

Estimation of the minimum shielding failure flashover current for first and subsequent lightning strokes to overhead transmission lines  

Science Journals Connector (OSTI)

Abstract ATP-EMTP simulations are performed to estimate the minimum shielding failure current causing flashover in overhead transmission lines with operating voltage in the range of 66 kV up to 735 kV. This critical current, affecting shielding failure flashover rate, is of great importance for assessing the insulation coordination of overhead transmission lines and the connected substations. The minimum shielding failure current causing flashover of line insulation is highly dependent upon insulator string flashover modelling and, also, markedly higher than that calculated according to the relevant IEEE Std 1243-1997 simplified expression. A modification of the latter is suggested by using multiplication factors of 1.5 and 1.65 for first and subsequent lightning strokes, respectively, so as to account for the increased dielectric strength of line insulator strings under non-standard lightning overvoltage surges. Alternatively, the critical currents can be respectively estimated by using average negative breakdown gradients per unit length of insulator string of 680 kV/m and 750 kV/m. The shielding failure flashover rate of the overhead transmission lines, being greatly influenced by insulator string flashover modelling, is lower than that obtained based on the critical current according to IEEE Std 1243-1997.

Zacharias G. Datsios; Pantelis N. Mikropoulos; Thomas E. Tsovilis

2014-01-01T23:59:59.000Z

245

Some operating features of a 100,000-volt transmission  

E-Print Network [OSTI]

of the thesis - - - - - - Page 2. (2) Introductory description of line - - - Page 5* A* Stations in operation, B. Plan and profile of route, C. Mechanical construction. D. Mechanical weakness of line - - - Paige 10. a^ Excessive lengths of spans. b... Superstructure Denver Substation - 7 Profile of the Transmission Line 8a Plan of the Transmission Line - - - - - 8b Transmission Line at Hell Gate - - - - - 11 Sleet on the Argentine Crest Tower 13 Tower Crushed by Snow Slide - - - - - 13 Curve of Sparking...

Jones, Raymond

1914-03-17T23:59:59.000Z

246

Study of Compact Tunable Filters Using Negative Refractive Index Transmission Lines  

E-Print Network [OSTI]

NOMENCLATURE CTL Composite (right/left-hand) Transmission Line LH Left-Handed LHTL Left-Handed Transmission Line NRI Negative Refractive Index PRI Positive Refractive Index RHTL Right-Handed Transmission Line SRF Self-Resonant Frequency TL... NOMENCLATURE CTL Composite (right/left-hand) Transmission Line LH Left-Handed LHTL Left-Handed Transmission Line NRI Negative Refractive Index PRI Positive Refractive Index RHTL Right-Handed Transmission Line SRF Self-Resonant Frequency TL...

Lewis, Brian Patrick

2011-08-08T23:59:59.000Z

247

Electric Companies and Electric Transmission Lines (North Dakota) |  

Broader source: Energy.gov (indexed) [DOE]

Electric Companies and Electric Transmission Lines (North Dakota) Electric Companies and Electric Transmission Lines (North Dakota) Electric Companies and Electric Transmission Lines (North Dakota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State North Dakota Program Type Line Extension Analysis The Public Service Commission has the authority to regulate the

248

EA-1972: Electric District 2 to Saguaro No. 2 Transmission Line...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EA-1972: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona EA-1972: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal...

249

Stand-off transmission lines and method for making same  

DOE Patents [OSTI]

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress. 16 figures.

Tuckerman, D.B.

1991-05-21T23:59:59.000Z

250

Stand-off transmission lines and method for making same  

DOE Patents [OSTI]

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress.

Tuckerman, David B. (Livermore, CA)

1991-01-01T23:59:59.000Z

251

Discontinuities in transmission lines and wave guides  

E-Print Network [OSTI]

IN THANSMISSION LINES AND ltrAVEGLIDES By Harold Fletcher Mathis A Thesis Submitted to the Graduate School of the Agricultural and Mechanical College of Texas in partial fulfillment of the requirements for the aegree of ELECTRICAL ENGIN~ May 1952 Major... s component to perform a pecific function and 1ts input impedance is not the proper v lue to give no discon- t1nuity, For example, an antenna which is to be fed by a 52-ohm coaxial cable is designed to give a desired red 1st ion pattern, but 1ts input...

Mathis, Harold Fletcher

2012-06-07T23:59:59.000Z

252

A novel fast distance relay for long transmission lines  

Science Journals Connector (OSTI)

Abstract The measuring accuracy and the measurement stability of conventional distance relay will be influenced by complex and remarkable harmonic components due to the large capacitance of the line when it is used for a long line. Correspondingly, the tripping speed will be delayed to some extent. To solve this problem, a fast distance relay for long transmission lines is presented, which is on the basis of the differential equation algorithm using ? transmission line model and the theory of Equal Transfer Process of Transmission Lines (ETPTL). The shortcomings of ? model differential equation algorithm due to the impact of high frequency components can be overcome by using a low-pass filter. The problem resulting from the difference between the transfer feature of the voltages used by the distance protection and that of the currents due to the transient characteristic of coupling capacitor voltage transformers (CCVT) can be solved by using virtual digital CCVT. Then, the new distance relay can trip quickly by re-structuring the voltage at the fault point and iterative calculations. A variety of ATP simulation tests show that the new relay has fast tripping speed and high reliability when applied to the long transmission lines.

Minghao Wen; Deshu Chen; Xianggen Yin

2014-01-01T23:59:59.000Z

253

Energia Sierra Juarez U.S. Transmission Line Draft EIS  

Broader source: Energy.gov (indexed) [DOE]

Energia Sierra Juarez U.S. Transmission Line Project Energia Sierra Juarez U.S. Transmission Line Project Draft Environmental Impact Statement Summary August 2010 U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Washington, DC 20585 Cooperating Agency - County of San Diego San Diego, CA DOE/EIS-0414 Department of Energy Washington, DC 20585 August 2010 Dear Sir/Madam: Enclosed for your review and comment is the Energia Sierra Juarez U.S. Transmission Line Project Draft Environmental Impact Statement (DOE/EIS-0414), prepared by the Department of Energy (DOE) pursuant to the National Environmental Policy Act of 1969 (NEPA) and its implementing regulations. The County of San Diego, California, is a cooperating agency in the preparation of this Draft EIS.

254

Multimode circuit QED with hybrid metamaterial transmission lines  

E-Print Network [OSTI]

Quantum transmission lines are a central to superconducting and hybrid quantum computing. Parallel to these developments are those of left-handed meta-materials. They have a wide variety of applications in photonics from the microwave to the visible range such as invisibility cloaks and perfect flat lenses. For classical guided microwaves, left-handed transmission lines have been proposed and studied on the macroscopic scale. We combine these ideas in presenting a left-handed/right-handed hybrid transmission line for applications in quantum optics on a chip. The resulting system allows circuit QED to reach a new regime: multi-mode ultra-strong coupling. Out of the many potential applications of this novel device, we discuss two; the preparation of multipartite entangled states and its use as a quantum simulator for the spin-boson model where a quantum phase transition is reached up to finite size-effects.

Daniel J. Egger; Frank K. Wilhelm

2013-02-22T23:59:59.000Z

255

Many Body Physics with Coupled Transmission Line Resonators  

E-Print Network [OSTI]

We present the Josephson junction intersected superconducting transmission line resonator. In contrast to the Josephson parametric amplifier, Josephson bifurcation amplifier and Josephson parametric converter we consider the regime of few microwave photons. We review the derivation of eigenmode frequencies and zero point fluctuations of the nonlinear transmission line resonator and the derivation of the eigenmode Kerr nonlinearities. Remarkably these nonlinearities can reach values comparable to Transmon qubits rendering the device ideal for accessing the strongly correlated regime. This is particularly interesting for investigation of quantum many-body dynamics of interacting particles under the influence of drive and dissipation. We provide current profiles for the device modes and investigate the coupling between resonators in a network of nonlinear transmission line resonators.

Martin Leib; Michael J. Hartmann

2012-08-01T23:59:59.000Z

256

E-Print Network 3.0 - aerial transmission lines Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Overhead Power-line Broadband Communications; Transmission Capacity and Electromagnetic Interference Summary: Medium Voltage Overhead Power-line Broadband Communications;...

257

Substation voltage upgrading  

SciTech Connect (OSTI)

Substation voltage uprating, i.e., conversion of a substation from a lower rated voltage to a higher rated voltage without a complete substation rebuild, can lead to excellent economic benefits. Utilization of the old substation layout and/or the existing equipment, to some extent, is the practical objective of such an uprating. The objective of this project was to assess the opportunities for substation uprating in the industry, to establish feasibility for such uprating and to study methods for accomplishing it. The final aim of the project was to provide guidance to utilities interested in uprating. 56 refs., 41 figs., 18 tabs.

Panek, J.; Elahi, H.; Sublich, M. (General Electric Co., Schenectady, NY (USA). Systems Development and Engineering Dept.)

1989-08-01T23:59:59.000Z

258

Exposure to transmission line electric fields during farming operations  

SciTech Connect (OSTI)

This paper describes an analysis of exposure to transmission line electric fields during typical farming operations. This analysis makes use of experimentally determined ''activity factors'' and time budget information for typical farms as compiled by the U.S. Department of Agriculture. A detailed exposure assessment for 18 ''typical farms'' (as defined by USDA) is provided for a base case 345 kV design. Exposure estimates for transmission lines ranging from 115-765 kV are provided for a representative farm.

Silva, M.; Huber, D.

1985-09-01T23:59:59.000Z

259

Self-monitoring high voltage transmission line suspension insulator  

DOE Patents [OSTI]

A high voltage transmission line suspension insulator (18 or 22) which monitors its own dielectric integrity. A dielectric rod (10) has one larger diameter end fitting attachable to a transmission line and another larger diameter end fitting attachable to a support tower. The rod is enclosed in a dielectric tube (14) which is hermetically sealed to the rod's end fittings such that a liquidtight space (20) is formed between the rod and the tube. A pressurized dielectric liquid is placed within that space. A discoloring dye placed within this space is used to detect the loss of the pressurized liquid.

Stemler, Gary E. (Vancouver, WA); Scott, Donald N. (Vancouver, WA)

1981-01-01T23:59:59.000Z

260

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Broader source: Energy.gov (indexed) [DOE]

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

A Study on Crosstalk Analysis in Aggregative Transmission Lines with Turning Vias Tapobrata Bandyopadhyay1  

E-Print Network [OSTI]

A Study on Crosstalk Analysis in Aggregative Transmission Lines with Turning Vias Tapobrata and signal integrity in high-speed signal channels is extremely important. Transmission lines and vias transmission lines (4 mil width) of different lengths arranged in bundles. The eight transmission line bundles

Swaminathan, Madhavan

262

Characterization of Co-planar Silicon Transmission Lines with and without Slow-waveEffect  

E-Print Network [OSTI]

Characterization of Co-planar Silicon Transmission Lines with and without Slow-waveEffect Woopoung and package transmission lines has been explained showing that the slow-wave mode cannot be represented only][2][3][4], characterization methods for package transmission lines have been applied to silicon transmission lines under

Swaminathan, Madhavan

263

Number and propagation of line outages in cascading events in electric power transmission systems  

E-Print Network [OSTI]

Number and propagation of line outages in cascading events in electric power transmission systems of transmission lines. We estimate from observed utility data how transmission line outages propagate, and obtain of transmission lines. The multiple mechanisms involved these cascading outages are many and varied, and the power

Dobson, Ian

264

TLSync: Support for Multiple Fast Barriers Using On-Chip Transmission Lines  

E-Print Network [OSTI]

TLSync: Support for Multiple Fast Barriers Using On-Chip Transmission Lines Jungju Oh jungju in a transmission-line broadcast network, thus leaving the transmission line network free for non-modulated (base--Interconnection architectures General Terms Design, Performance Keywords Multi-core, Synchronization, Barrier, Transmission Line

Prvulovic, Milos

265

DOE/EIS-0285/SA-134: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (Bandon-Rogue-GoldBeach)(3/24/03)  

Broader source: Energy.gov (indexed) [DOE]

4, 2003 4, 2003 REPLY TO ATTN OF: KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-134-Bandon-Rogue-GoldBeach) Ben Tilley Natural Resource Specialist - TFE/Alvey Proposed Action: Vegetation Management for the Bandon-Rogue-Gold Beach transmission line corridor. This corridor includes the Bandon-Rogue #1 115 kV transmission line from Bandon Substation to Rogue Substation and the Rogue-Gold Beach #1 and #2 115kV transmission lines, starting at Rogue Substation and ending at Gold Beach Substation. In addition the project includes adjacent portions of the Fairview-Rogue #1 230 kV Transmission Line. Location: The project is located in the BPA Eugene Region, Coos and Curry Counties, Oregon.

266

Tests with a line-commutated converter as a variable inductive load on the Bonneville Power Administration transmission system  

SciTech Connect (OSTI)

A twelve-pulse, line-commutated converter, with a steady-state rating of 2.5 kV and 5.5 kA, formerly used for charging and discharging a superconducting magnet, was reconfigured as a static reactive power load. Tests staged at the Tacoma, WA, substation of the Bonneville Power Administration (BPA) revealed that the converter could be used as a variable inductive load, provided a stable current controller was installed. The unit was modulated as a variable VAR load following a sinusoidal VAR demand signal with an amplitude up to 14.8 MVAR. The total losses at maximum VAR output were 370 kW. This paper explains the necessary modifications of the converter to operate as a variable reactive load. Measured current waveshapes are analyzed. The effects of such a load on the BPA transmission system are presented.

Boenig, H.J.; Hauer, J.F.; Nielsen, R.G.

1986-01-01T23:59:59.000Z

267

High voltage gas insulated transmission line with continuous particle trapping  

DOE Patents [OSTI]

This invention provides a novel high voltage gas insulated transmission line utilizing insulating supports spaced at intervals with snap-in means for supporting a continuous trapping apparatus and said trapping apparatus having perforations and cutouts to facilitate trapping of contaminating particles and system flexibility.

Cookson, Alan H. (Pittsburgh, PA); Dale, Steinar J. (Monroeville, PA)

1983-01-01T23:59:59.000Z

268

Buffalo Flat Service 115-KV Transmission Project : Environmental Assessment.  

SciTech Connect (OSTI)

BPA, in conjunction with Midstate Electric Cooperative (Midstate), proposed to construct two sections of a new 115-kV transmission line in central Oregon: one section from BPA's LaPine Substation to Midstate's Fort Rock Substation (BPA), and the other from Fort Rock Substation to the proposed US Air Force radar transmitter site at Buffalo Flat (Midstate). The proposed line would be a total of about 74 miles long, and of either wood or steel single-pole construction; it would parallel existing corridors and/or roads for much of the distance. 23 refs., 6 figs., 5 tabs.

United States. Bonneville Power Administration.

1987-07-01T23:59:59.000Z

269

Damping of bending waves in truss beams by electrical transmission lines with PZT actuators  

E-Print Network [OSTI]

Damping of bending waves in truss beams by electrical transmission lines with PZT actuators F. dell of the truss beam with an electrical transmission line by a line distribution of PZT actuators. It has been-order transmission line, and that such a line is not suitable to damp bending waves. In the present paper, we propose

Boyer, Edmond

270

RESONANCES FOR MICROSTRIP TRANSMISSION LINES HABIB AMMARI y AND FAOUZI TRIKI y  

E-Print Network [OSTI]

RESONANCES FOR MICROSTRIP TRANSMISSION LINES #3; HABIB AMMARI y AND FAOUZI TRIKI y Abstract of the line goes to zero. Key words. microstrip transmission lines, waveguides, resonances, characteristic in mi- crostrip transmission lines mounted on planar open waveguides. Microstrip transmis- sion lines

Ammari, Habib

271

DOE Transmission Capacity Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

272

Substation fire protection features  

SciTech Connect (OSTI)

This paper describes Commonwealth Edison`s (ComEd) approach to substation fire protection. Substation fires can have a major operational, financial, as well as political impact on a utility. The overall Company philosophy encompasses both active and passive fire protection features to provide prompt detection, notification, and confinement of fire and its by-products. Conservatively designed smoke detection systems and floor and wall penetration seals form the backbone of this strategy. The Company has implemented a program to install these features in new and existing substations. Thus far these measures have been successful in mitigating the consequences of substation fires.

Hausheer, T.G. [Commonwealth Edison Co., Chicago, IL (United States)

1995-10-01T23:59:59.000Z

273

Substation PSA Model  

Science Journals Connector (OSTI)

Chapter 6 describes how to create the substation model, the core of the PSA application... Chap. 4 . First, the modelling principles and then the details of the mode...

Liisa Haarla; Mikko Koskinen; Ritva Hirvonen…

2011-01-01T23:59:59.000Z

274

Substation grounding optimization.  

E-Print Network [OSTI]

??Substation grounding is a critical part of the overall electric power system. It is designed to not only provide a path to dissipate electric currents… (more)

Balev, Vadim

2014-01-01T23:59:59.000Z

275

ECEN 720 High-Speed Links Circuits and Systems Lab1 -Transmission Lines  

E-Print Network [OSTI]

1 ECEN 720 High-Speed Links Circuits and Systems Lab1 - Transmission Lines Objective To learn transmission lines and time-domain refectometer (TDR). Introduction Wires are used to transmit clocks and data data communication chip design, the wires are often treated as transmission lines. Proper transmission

Palermo, Sam

276

Transmission Line Theory 51 MOTOROLAECLinPS and ECLinPS Lite  

E-Print Network [OSTI]

Transmission Line Theory 5­1 MOTOROLAECLinPS and ECLinPS Lite DL140 -- Rev 3 SECTION 2 Transmission interconnects to determine if transmission line phenomena will occur. A handy rule of thumb to determine if an interconnect trace should be considered a transmission line is if the interconnect delay is greater than 1/8th

McNeill, John A.

277

Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

S-1 S.1 Introduction This document is both a State of Montana Supplemental Draft Environmental Impact Statement (EIS) and a U.S. Department of Energy (DOE) Federal Draft EIS (referred to herein as the Draft EIS for both state and federal purposes) prepared for the United States portion of the proposed Montana Alberta Tie Ltd. (MATL) 230-kilovolt (kV) transmission line. MATL has proposed to construct an international 230-kV alternating current merchant (private) transmission line that would originate at an existing NorthWestern Energy (NWE) 230-kV switch yard at Great Falls, Montana, and extend north to a new substation to be constructed northeast of Lethbridge, Alberta, crossing the U.S.-Canada international border north of Cut Bank, Montana (proposed Project). Approximately

278

EIS-0451: Hooper Springs Transmission Project, Caribou County, Idaho  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) is preparing an EIS to assess the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line that would extend from BPA's proposed Hooper Springs Substation near Soda Springs, Idaho, to either an existing Lower Valley Energy (LVE) substation or a proposed BPA connection facility that would connect with LVE's existing transmission system in northeastern Caribou County. The proposed new transmission line would be about 22 to 33 miles depending on the route alternative or option.

279

Environmental Assessment for the USK Loop Line 230 kV Transmission Project.  

SciTech Connect (OSTI)

This Environmental Assessment (EA) covers the transmission/substation facilities that would be constructed or modified. It has been prepared by an interdisciplinary team, as well as through consultation on the Federal, state and local levels. It is subject to a 60-day review by the general public and other agencies and will generally coincide with the release of the final state EIS. This EA presents an expansion of those transmission-related discussions in the state EIS where BPA could undertake their construction or modifiction.

United States. Bonneville Power Administration.

1985-09-01T23:59:59.000Z

280

EIS-0486: Plains & Eastern Clean Line Transmission Project  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Gas insulated transmission line with insulators having field controlling recesses  

DOE Patents [OSTI]

A gas insulated transmission line having a novel insulator for supporting an inner conductor concentrically within an outer sheath. The insulator has a recess contiguous with the periphery of one of the outer and inner conductors. The recess is disposed to a depth equal to an optimum gap for the dielectric insulating fluid used for the high voltage insulation or alternately disposed to a large depth so as to reduce the field at the critical conductor/insulator interface.

Cookson, Alan H. (Pittsburgh, PA); Pederson, Bjorn O. (Chelmsford, MA)

1984-01-01T23:59:59.000Z

282

Calculation of Ramp Response of Lossy Transmission Lines Using Two-port Network Functions  

E-Print Network [OSTI]

1 Calculation of Ramp Response of Lossy Transmission Lines Using Two-port Network Functions Payam-port representation of the transmission line and accounts for the output resistance of the driver and the line response of lossy transmission line which expands the reciprocal of transfer function of the system

Pedram, Massoud

283

Performance Optimization by Wire and Buffer Sizing Under the Transmission Line Model \\Lambda  

E-Print Network [OSTI]

Performance Optimization by Wire and Buffer Sizing Under the Transmission Line Model \\Lambda Tai to the time­of­flight delay of a line, it is necessary to consider the transmission line behavior for de­ lay on this formula, we show the property that the minimum delay for a transmission line with reflection occurs when

Chen, Tai-Chen

284

Adapting the Transmission Reach in Mixed Line Rates WDM Transport Networks  

E-Print Network [OSTI]

Adapting the Transmission Reach in Mixed Line Rates WDM Transport Networks K. Christodoulopoulos, K to support the transmission at different line rates. Previously proposed planning algorithms, have used a transmission reach limit for each modulation format/line rate, mainly driven by single line rate systems

Varvarigo, Emmanouel "Manos"

285

Optimized Waveform Relaxation Methods for the Longitudinal Partitioning of Transmission Lines  

E-Print Network [OSTI]

1 Optimized Waveform Relaxation Methods for the Longitudinal Partitioning of Transmission Lines convergence. Here we consider transmission line circuits since they represent an important part of a Spice type circuit solver. For transmission lines, the coupling between different lines is relatively weak

Gander, Martin J.

286

Experimental adoption of RCM in EDF substations  

SciTech Connect (OSTI)

EDF, after testing Reliability Centered Maintenance (RCM) on systems used in nuclear power plants, has now successfully extended RCM to all of its nuclear power plants. In the light of this experience, EDF has committed itself to a pilot study on a line bay of a 400 kV substation in 1992. The RCM method as applied benefited from EDF`s policy of maintenance, introduced five years ago on all substations, which has enhanced prospects of reliability. The original feature in the selection of maintenance tasks was that it brought into play two criteria for failure assessment - frequency and seriousness - and two criteria for maintenance task selection - efficiency and facility. The final outcome of RCM as applied to substation maintenance is to categorize maintenance tasks into: (1) essential maintenance tasks, (2) optional tasks, depending on the type and location of the substation, as well as on factors relating to local management of maintenance policy, and (3) unnecessary tasks.

Heroin, G.; Aupied, J. [Electricite de France, Clarmart (France); Sanchis, G. [Direction EDF Production Transport, Courbevoie (France)

1996-08-01T23:59:59.000Z

287

Substation Expansion Planning  

Science Journals Connector (OSTI)

Consider an 11-load node case as depicted in Fig. 7.1..., fed in 33 kV and to be supplied through high-voltage (HV) substation(s) (say 230 kV:33 kV)... Fig. 7.1 ...

Hossein Seifi; Mohammad Sadegh Sepasian

2011-01-01T23:59:59.000Z

288

Ventilation of Electrical Substations  

Science Journals Connector (OSTI)

... THE type of construction used for substations is generally governed by requirements, for example, fire and air-raid precautions, which ... Electrical Engineers, F. Favell and E. W. Connon record their experiences in overcoming substation ventilation problems in particular cases. Adequate and suitably planned ventilation will maintain ...

1943-05-01T23:59:59.000Z

289

Design Considerations for a Large-Scale Wireless Sensor Network for Substation Monitoring  

E-Print Network [OSTI]

Design Considerations for a Large-Scale Wireless Sensor Network for Substation Monitoring Asis University City Blvd. Charlotte, NC 28223 Luke Van der Zel and Bienvenido Rodriguez Substations Group EPRI-Transmissions & Substations 9625 Research Drive Charlotte, NC 28262 Ralph McKosky Technology Innovation, Environment

Nasipuri, Asis

290

Demo Abstract: Wireless Sensor Network for Substation Monitoring: Design and Deployment  

E-Print Network [OSTI]

Demo Abstract: Wireless Sensor Network for Substation Monitoring: Design and Deployment Asis-Transmissions & Substations 9625 Research Drive Charlotte, NC 28262 {lvanderz,birodriguez} @epri.com Ralph McKosky, Joseph in a substation for monitoring the health of power subsystems such as circuit breakers, trans- formers

Nasipuri, Asis

291

Research on Smart Substation Equipment Condition Monitoring System Based on Wireless Sensor Networks  

Science Journals Connector (OSTI)

Reference to characteristics of wireless sensor networks (WSNs) technology and the three-tier architecture of smart substation, the paper designs an on-line condition monitoring system of smart substation equipme...

Jie He; Xiaoqing Huang; Yang Yang

2012-01-01T23:59:59.000Z

292

Substation Configuration Reliability 1 Reliability of Substation Configurations  

E-Print Network [OSTI]

Substation Configuration Reliability 1 Reliability of Substation Configurations Daniel Nack, Iowa substation, it still contains what could be described as weak points or points of failure that would lead to loss of load. By knowing how to calculate the reliability of different substation configurations

McCalley, James D.

293

Sundial Substation Site Baxter Road Substation Site Casey Road  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sundial Substation Site Baxter Road Substation Site Casey Road Substation Site Monahan Creek Substation Site YALE DAM MERWIN DAM S i l v e r L a k e Lake Merwin Y a l e L a k e V a...

294

EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billings, Williams, McKenzie, and Mountrail Counties, North Dakota  

Broader source: Energy.gov [DOE]

USDA Rural Utilities Service prepared an EIS that evaluates the potential environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE’s Western Area Power Administration, a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to Western’s transmission system.

295

Analytical time domain electromagnetic field propagators and closed-form solutions for transmission lines  

E-Print Network [OSTI]

An analytical solution for the coupled telegrapher’s equations in terms of the voltage and current on a homogeneous lossy transmission line and multiconductor transmission line is presented. The resulting telegrapher’s equation solution is obtained...

Jeong, Jaehoon

2009-05-15T23:59:59.000Z

296

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Energy Savers [EERE]

52: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville...

297

Sensor Technologies for a Smart Transmission System An EPRI White Paper  

Broader source: Energy.gov (indexed) [DOE]

Sensor Technologies for a Smart Transmission System Sensor Technologies for a Smart Transmission System An EPRI White Paper December 2009 December 2009 Page 2 An EPRI White Paper Sensor Technologies for a Smart Transmission System Aging equipment and tight O&M budgets are putting the squeeze on transmission line and substation managers. A new gen- eration of low-cost sensors can help diag- nose equipment health to optimize mainte- nance and prevent catastrophic failures. Power delivery systems are among the largest and most diverse, remotely located investments. There are a num- ber of challenges that utilities face with their transmis- sion line and substation assets: * Existing transmission lines and substations are aging while the required reliability is increasing and the availability of clearance to perform maintenance is

298

Transient Simulation of On-Chip Transmission Lines via Exact Pole Extraction  

E-Print Network [OSTI]

Transient Simulation of On-Chip Transmission Lines via Exact Pole Extraction Guoqing Chen and Eby G response at the far end of a transmission line is proposed in this paper. Unlike approximating the poles, on-chip interconnects exhibit significant transmission line behavior. An efficient solution

Friedman, Eby G.

299

Efficient Macromodeling of Power Distribution Planes using Delay Extraction based Transmission Line Representation  

E-Print Network [OSTI]

Efficient Macromodeling of Power Distribution Planes using Delay Extraction based Transmission Line plane structures are based on discretization of the plane into a grid of transmission lines [3]-[6]. Macromodeling the transmission line network using conventional lumped RLGC elements [4]- [6] can provide

Roy, Sourajeet

300

Longitudinal Partitioning Based Waveform Relaxation Algorithm for Transient Analysis of Long Delay Transmission Lines  

E-Print Network [OSTI]

Transmission Lines Sourajeet Roy and Anestis Dounavis Department of Electrical and Computer Engineering networks. The proposed methodology represents lossy transmission lines as a cascade of lumped circuit of characteristics. This allows the transmission line to be naturally partitioned into smaller, weakly coupled

Roy, Sourajeet

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

ECEN 720 High-Speed Links: Circuits and Systems Lab1 -Transmission Lines  

E-Print Network [OSTI]

1 ECEN 720 High-Speed Links: Circuits and Systems Lab1 - Transmission Lines Objective To learn about transmission lines and time-domain reflectometer (TDR). Introduction Wires are used to transmit. In high speed data communication chip design, the wires are often treated as transmission lines. Proper

Palermo, Sam

302

A new expression for the ground transient resistance matrix elements of multiconductor overhead transmission lines  

E-Print Network [OSTI]

transmission lines F. Rachidi a, *, S.L. Loyka b , C.A. Nucci c , M. Ianoz a a Swiss Federal Institute The ground impedance matrix elements of a multiconductor overhead transmission line do not have analytical-singular, and which describe, within the limits of transmission line theory, both the early-time and late

Loyka, Sergey

303

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect  

E-Print Network [OSTI]

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect Aaron Carpenter-performance interconnect fabric that is energy-efficient. Well-engineered transmission line- based communication systems-based analysis, we show that a shared-medium fabric based on transmission line can offer better performance

Wu, Hui

304

Tailoring of electron flow current in magnetically insulated transmission lines J. P. Martin,2,3  

E-Print Network [OSTI]

Tailoring of electron flow current in magnetically insulated transmission lines J. P. Martin,2,3 M of the drive pulse. It is clear that neither fixed gap nor constant-impedance transmission lines are optimal the impedance profiles developed in a radial disk magnetically insulated transmission line geometry. The input

305

An empirical study of the economies of scale in AC transmission line construction costs  

E-Print Network [OSTI]

1 An empirical study of the economies of scale in AC transmission line construction costs Krishnan the interconnection (Western, ERCOT, Eastern) in which the transmission was built, and · the capacity of the line. We the change in "Available Transmission Capability" (ATC) [4] between the cases of having the line in and out

Baldick, Ross

306

EIS Studies of Porous Oxygen Electrodes with Discrete II. Transmission Line Modeling  

E-Print Network [OSTI]

EIS Studies of Porous Oxygen Electrodes with Discrete Particles II. Transmission Line Modeling Chad conclusions. We describe a new model based on an array of parallel, nonuniform transmission lines to be the first porous electrode transmission line model that incorporates such physically realistic features

307

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect  

E-Print Network [OSTI]

A Design Space Exploration of Transmission-Line Links for On-Chip Interconnect Aaron Carpenter-performance interconnect fabric that is energy-efficient. Well-engineered transmission line-based commu- nication systems-based analysis, we show that a shared-medium fabric based on transmission line can offer better performance

Huang, Michael C.

308

Metamaterial polarization spectral filter: Isolated transmission line at any prescribed wavelength  

E-Print Network [OSTI]

Metamaterial polarization spectral filter: Isolated transmission line at any prescribed wavelength.1063/1.3656286] One of the most elegant polarization spectral filters exhibiting a single isolated transmission line state of light, a high background- and ripple-free transmission line centered at the isoindex point

Zheludev, Nikolay

309

A quadruple transmission line nitrogen laser P. Persephonis, B. Giannetas and R. Rigopoulos  

E-Print Network [OSTI]

295 A quadruple transmission line nitrogen laser P. Persephonis, B. Giannetas and R. Rigopoulos. Abstract. 2014 Theoretical considerations on the advantages of a quadruple parallel-plate transmission line nitrogen laser comparatively to a double transmission line one are given. Experimental verihcation shows

Boyer, Edmond

310

Lossy Electric Transmission Line Soft Fault Diagnosis: an Inverse Scattering Approach  

E-Print Network [OSTI]

1 Lossy Electric Transmission Line Soft Fault Diagnosis: an Inverse Scattering Approach Huaibin transmission lines is studied through the inverse scattering approach. The considered soft faults are modeled as continuous spatial variations of distributed characteristic parameters of transmission lines. The diagnosis

Paris-Sud XI, Université de

311

PHYSICAL REVIEW B 87, 144301 (2013) Parametric amplification in Josephson junction embedded transmission lines  

E-Print Network [OSTI]

transmission lines O. Yaakobi,1,* L. Friedland,2 C. Macklin,3 and I. Siddiqi3 1 INRS-EMT, 1650 Boul. Lionel; published 1 April 2013) An electronic transmission line that contains an array of nonlinear elements of the node flux along the transmission line is derived. It is shown that due to the nonlinearity

Friedland, Lazar

312

AN INFINITE DIMENSIONAL DESCRIPTOR SYSTEM MODEL FOR ELECTRICAL CIRCUITS WITH TRANSMISSION LINES  

E-Print Network [OSTI]

AN INFINITE DIMENSIONAL DESCRIPTOR SYSTEM MODEL FOR ELECTRICAL CIRCUITS WITH TRANSMISSION LINES TIMO REIS Abstract. In this paper a model of linear electrical circuits with transmission lines is de-coupled with the telegraph equations who describe the behavior of the transmission lines. The resulting system of equations

Reis, Timo

313

Cascadability and reshaping properties of a saturable absorber inserted inside a RZ transmission line for future  

E-Print Network [OSTI]

absorber component cascaded into a 100-km SMF RZ transmission line in order to annihilate the ghost paid to transmission lines working at higher bit-rates, such as 160 Gbit/s [1]. However, many studies Absorber device cascaded inside a 100-km Single Mode Fiber (SMF)- based RZ transmission line cadenced

Paris-Sud XI, Université de

314

Multistability in nonlinear left-handed transmission lines David A. Powell,a  

E-Print Network [OSTI]

Multistability in nonlinear left-handed transmission lines David A. Powell,a Ilya V. Shadrivov; published online 2 July 2008 Employing a nonlinear left-handed transmission line as a model system, we, which at higher power may result in chaotic dynamics of the transmission line. © 2008 American Institute

315

Solution of Large Transmission Line Type Circuits Using a New Optimized Waveform Relaxation Partitioning  

E-Print Network [OSTI]

Solution of Large Transmission Line Type Circuits Using a New Optimized Waveform Relaxation. However, so far the partitioning of strongly coupled circuits like transmission lines has been di#cult. We. We analyze convergence for the case of a transmission line type circuit and illustrate the method

Gander, Martin J.

316

Application of the Transmission Line Matrix method for outdoor sound propagation modelling Part 2  

E-Print Network [OSTI]

Application of the Transmission Line Matrix method for outdoor sound propagation modelling ­ Part 2 propagation model. The time-domain acoustic model is based on the Transmission Line Matrix method. Its.apacoust.2013.07.015 #12;Part 1, the presentation and evaluation of the Transmission Line Matrix method showed

Paris-Sud XI, Université de

317

Uniqueness in the simultaneous reconstruction of multiparameters of a transmission line  

E-Print Network [OSTI]

Uniqueness in the simultaneous reconstruction of multiparameters of a transmission line Dongwoo of the physical parameters of a nonuniform transmission line is presented. The approach is based on the transfor of the line. 1 Introduction Methods for reconstructing the physical parameters of a nonuniform transmission

Sheen, Dongwoo

318

An objective approach for selecting ice or wet–snow design loads on transmission lines  

Science Journals Connector (OSTI)

...assessing iceloads for a transmission-line route in southern Norway...wet-snow loads along a transmission-line route, it will be useful...Figure 9. The 420 kV transmission line from Kristiansand to Holen. The nal route follows the alternatives...

2000-01-01T23:59:59.000Z

319

Implementation of superconducting fault current limiter for flexible operation in the power substation  

Science Journals Connector (OSTI)

Abstract The concentration of large-scale power loads located in the metropolitan areas have resulted in high fault current levels during a fault thereby requiring the substation to operate in the double busbar configuration mode. However, the double busbar configuration mode results in deterioration of power system reliability and unbalanced power flow in the adjacent transmission lines which may result in issues such as overloading of lines. This paper proposes the implementation of the superconducting fault current limiter (SFCL) to be installed between the two substation busbars for a more efficient and flexible operation of the substation enabling both single and double busbar configurations depending on the system conditions for guaranteeing power system reliability as well as fault current limitations. Case studies are being performed for the effectiveness of the SFCL installation and results are compared for the cases where the substation is operating in single and double busbar mode and with and without the installation of the SFCL for fault current mitigation.

Chong Suk Song; Hansang Lee; Yoon-sung Cho; Jaewan Suh; Gilsoo Jang

2014-01-01T23:59:59.000Z

320

Analysis of the ITER LFS Reflectometer Transmission Line System  

SciTech Connect (OSTI)

A critical issue in the design of the ITER Low Field Side (LFS) reflectometer is the transmission line (TL) system. A TL connects each launcher to a diagnostic instrument. Each TL will typically consist of ~42 m of corrugated waveguide and up to 10 miter bends. Important issues for the performance of the TL system are mode conversion and reflections. Minimizing mode conversion and reflections in the waveguide are critical to minimizing standing waves and phase errors in the reflectometer-measured phase. The performance of the corrugated waveguide and miter bends is analyzed and recommendations given.

Hanson, Gregory R [ORNL; Wilgen, John B [ORNL; Bigelow, Tim S [ORNL; Diem, Stephanie J [ORNL; Biewer, Theodore M [ORNL

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Microsoft PowerPoint - FY12 RMR - CRSP TRANSMISSION PLANNING MEETING_Final.PPT [Compatibility Mode]  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

TRANSMISSION TRANSMISSION PLANNING MEETING PLANNING MEETING December 6, 2011 December 6, 2011 1 Agenda g Introductions CRSP North (Loveland) Program CRSP South (Phoenix) Program CRSP South (Phoenix) Program Open Forum 2 CRSP North (Loveland) ( ) Capital Program Transmission Lines Substations Communications Communications Control, Protection and Metering M bil & H E i t Mobile & Heavy Equipment Programmatic Improvements 3 Transmission Lines Line Equipment Replacements 50k in FY12 & every year after Pleasant View 24.9-kV Line Replacement Estimated Project Cost (EPC) $ 1,000k FY15 $200K FY16 $800K 4 Substations Annual Equipment Replacement Program Substation Test Equipment Combined all test equipment categories under movable property, "Test Equipment Replacements"

322

Analysis of Lightning-induced Voltages in Overhead Transmission Lines  

Science Journals Connector (OSTI)

Abstract In this work we study the coupling of lightning induced voltages in Overhead Transmission Lines .The study is led directly in the time domain with hold in account the effect of a finite conductivity of the soil. After discretization by the method so-called FDTD (Finite Difference Time Domain) of the lines equations excited by a lightning wave and the application in every node of the network in current and voltage, we deduct a equations system, of which the resolution permits us to deduct the induced electric quantities in every node of the network. In order to confirm our theoretical work, we present a set of applications that allows validating this study.

Mostefa. Boumaiza; Djamel. Labed

2014-01-01T23:59:59.000Z

323

SunZia Southwest Transmission Project Comments  

Broader source: Energy.gov (indexed) [DOE]

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

324

$Nb_{3}Al$ prototype conductor for the transmission line magnet  

E-Print Network [OSTI]

The Very Large Hadron Collider (VLHC), under consideration for construction at Fermilab in the next 1-2 decades, is a 100 TeV cm pp collider. A major cost driver is the magnet. R&D is underway on several possible magnet designs. A low-field (2T) superferric magnet, sometimes called a transmission line magnet, may be the most cost- effective route to the VLHC. Although NbTi is now the cheapest superconductor measured in cost/kA-meter, Nb/sub 3/Al has the potential advantage that it remains superconducting at higher temperature. It may be particularly suited to the single "turn" and long straight lengths of the transmission line design. The combination of the simple magnet design and the higher strain tolerance than e.g. Nb/sub 3/Sn allows a simple process of cable fabrication, reaction, and magnet assembly. This higher strain tolerance is an advantage for splicing in the field. Sumitomo Electric Industries is producing an Nb/sub 3/Al conductor for the Fermilab low-field magnet program. (9 refs).

Barzi, E; Malamud, E; Mazur, P O; Piekarz, H; Wake, M; Hayashi, K; Koganeya, M

1999-01-01T23:59:59.000Z

325

Microsoft Word - Ringold Substation Upgrade CX.doc  

Broader source: Energy.gov (indexed) [DOE]

1, 2011 1, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum Myra Lovell - TELP-TPP-3 Proposed Action: Ringold Substation Structure Replacement Project Budget Information: Work Order # 00272078 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B4.6 "Additions or modifications to electric power transmission facilities..." Location: Franklin County, Washington - Township 12 North, Range 29 East, Section 26 of the Basin City Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to replace the single pole structure 8/9 of the Benton-Scooteney No. 1 115-kV transmission line, the attached vertically mounted disconnect switch,

326

EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental  

Broader source: Energy.gov [DOE]

This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

327

Environmental Assessment of Proposed Lynch Creek Substation Project : Service to Eatonville and the Ohop Valley.  

SciTech Connect (OSTI)

Bonneville Power Administation (BPA) proposes to construct 3.2 miles of 115-kV transmission line from a tap point on Tacoma City Light's Cowlitz-LaGrande 115-kV line to a new 115/12.5-kV, 15/20/25 MVA substation to be located about 1 mile northwest of Eatonville, adjacent to the Eatonville cutoff road. This plan was selected following initial consideration of five alternative plans for satisfying electrical needs in the project area and following agreement with BPA's customers on a vicinity for the substation site. The vicinity selected is midway between the two load centers and would require the least construction of distribution line. Subsequently, four alternative line routes and two substation sites have been evaluated. These alternatives provide a range of costs, engineering solutions, and potential environmental impacts. This evaluation led to the selection of one line route. This document describes possible environmental impacts of the proposed actions. 7 refs, 9 figs., 5 tabs.

United States. Bonneville Power Administration.

1983-05-01T23:59:59.000Z

328

Notice of Intent for the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line (DOE/EIS-0379) (05/05/05)  

Broader source: Energy.gov (indexed) [DOE]

56 56 Federal Register / Vol. 70, No. 86 / Thursday, May 5, 2005 / Notices Angeles to change between direct current and alternating current. This proposed converter station would be located in the vicinity of BPA's Port Angeles Substation in Clallam County, Washington, and would occupy from one to two acres. OC has proposed that the converter station be sited within the existing boundary of the Port Angeles Substation on property leased or otherwise transferred from BPA to OC. OC has proposed to begin construction of the HVDC transmission line and converter station by June 2006. Under this schedule, the HVDC system would be interconnected to the FCRTS in the fall of 2007, with a proposed operation date of December 2007. Once constructed, all existing land use and

329

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect (OSTI)

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

330

Criteria for phase-to-phase clearances of HV substations  

SciTech Connect (OSTI)

To facilitate uprating of HV substations, the paper re-examines line-to-line insulation design criteria. The basis for existing practices and the principles of line-to-line lightning surge overvoltage stresses are reviewed. Results of a digital study for a realistic substation are presented. The conclusions show that the line-to-line stresses, as limited by surge arresters, are substantially higher than line-to-ground stresses. This represents increased requirements as compared to existing standards. However, due to low protective levels of modern arresters, substantial reduction of line-to-line clearances is still feasible.

Panek, J.; Sublich, M.; Elahi, H. (GE Industry and Utility Sales, Schenectady, NY (US))

1990-01-01T23:59:59.000Z

331

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

332

EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

333

On PMU Location Selection for Line Outage Detection in Wide-area Transmission Networks  

E-Print Network [OSTI]

1 On PMU Location Selection for Line Outage Detection in Wide-area Transmission Networks Yue Zhao locations to collect voltage phase angle measurements for detecting line outages in wide-area transmission measurements. Index Terms--Phasor measurement unit, location selection, outage detection, transmission networks

Zhao, Yue

334

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

Office of Fossil Energy U.S. Department of Energy 1000 Independence Avenue, S.W. Washington, DC 20585 Cooperating Agencies: U.S. Department of the Interior Bureau of Land Management U.S. Department of Agriculture Forest Service COVER SHEET Responsible Agency: U.S. Department of Energy (DOE), Office of Fossil Energy (FE) Cooperating Agencies: U.S. Department of Agriculture Forest Service (USFS), U.S. Department of the Interior Bureau of Land Management (BLM) Title: Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line Final Environmental Impact Statement (EIS) Location: Pima and Santa Cruz Counties, Arizona Contacts: For additional information on this Final Environmental Impact Statement (EIS), contact: For general information on the DOE

335

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

SUMMARY Office of Fossil Energy U.S. Department of Energy 1000 Independence Avenue, S.W. Washington, DC 20585 Cooperating Agencies: U.S. Department of the Interior Bureau of Land Management U.S. Department of Agriculture Forest Service Tucson Electric Power Company Sahuarita-Nogales Transmission Line Final Environmental Impact Statement January 2005 DOE/EIS - 0336 BLM Reference No. AZA 31746 SUMMARY Office of Fossil Energy U.S. Department of Energy 1000 Independence Avenue, S.W. Washington, DC 20585 Cooperating Agencies: U.S. Department of the Interior Bureau of Land Management U.S. Department of Agriculture Forest Service COVER SHEET Responsible Agency: U.S. Department of Energy (DOE), Office of Fossil Energy (FE)

336

Transmission-line decelerators for atoms in high Rydberg states  

E-Print Network [OSTI]

Beams of helium atoms in Rydberg states with principal quantum number $n=52$, and traveling with an initial speed of 1950 m/s, have been accelerated, decelerated and guided while confined in moving electric traps generated above a curved, surface-based electrical transmission line with a segmented center conductor. Experiments have been performed with atoms guided at constant speed, and with accelerations exceeding $10^7$ m/s$^2$. In each case the manipulated atoms were detected by spatially resolved, pulsed electric field ionization. The effects of tangential and centripetal accelerations on the effective trapping potentials experienced by the atoms in the decelerator have been studied, with the resulting observations highlighting contributions from the density of excited Rydberg atoms to the acceleration, deceleration and guiding efficiencies in the experiments.

Lancuba, P

2014-01-01T23:59:59.000Z

337

Monolithic high voltage nonlinear transmission line fabrication process  

DOE Patents [OSTI]

A process for fabricating sequential inductors and varistor diodes of a monolithic, high voltage, nonlinear, transmission line in GaAs is disclosed. An epitaxially grown laminate is produced by applying a low doped active n-type GaAs layer to an n-plus type GaAs substrate. A heavily doped p-type GaAs layer is applied to the active n-type layer and a heavily doped n-type GaAs layer is applied to the p-type layer. Ohmic contacts are applied to the heavily doped n-type layer where diodes are desired. Multiple layers are then either etched away or Oxygen ion implanted to isolate individual varistor diodes. An insulator is applied between the diodes and a conductive/inductive layer is thereafter applied on top of the insulator layer to complete the process. 6 figs.

Cooper, G.A.

1994-10-04T23:59:59.000Z

338

Monolithic high voltage nonlinear transmission line fabrication process  

DOE Patents [OSTI]

A process for fabricating sequential inductors and varactor diodes of a monolithic, high voltage, nonlinear, transmission line in GaAs is disclosed. An epitaxially grown laminate is produced by applying a low doped active n-type GaAs layer to an n-plus type GaAs substrate. A heavily doped p-type GaAs layer is applied to the active n-type layer and a heavily doped n-type GaAs layer is applied to the p-type layer. Ohmic contacts are applied to the heavily doped n-type layer where diodes are desired. Multiple layers are then either etched away or Oxygen ion implanted to isolate individual varactor diodes. An insulator is applied between the diodes and a conductive/inductive layer is thereafter applied on top of the insulator layer to complete the process.

Cooper, Gregory A. (346 Primrose Dr., Pleasant Hill, CA 94523)

1994-01-01T23:59:59.000Z

339

Microsoft Word - CX-ColumbiaREADaytonSubstationTap_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2011 7, 2011 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Mike Normandeau Customer Account Executive - PSE-SPOKANE Proposed Action: Columbia Rural Electric Association (Columbia REA) Dayton Substation Tap Line Project Budget Information: Work Order 00118303, Task 17 PP&A Project No.: PP&A 2089 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.12: Construction of electric power lines approximately 10 miles in length or less that are not for the integration of major new generation resources into a main transmission system. Location: Dayton, Columbia County, Washington Township 10 North, Range 39 East, Sections 14-17, 20 & 24 Township 10 North, Range 40 East, Sections 19 & 30

340

Microsoft Word - CX-Covington_Substation_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Harvey Schowe Harvey Schowe Project Manager - TESF-CSB-2 Proposed Action: Installation of new water system (potable and fire suppression) to entire Covington Complex PP&A Project No.: PP&A-1601 Budget Information: Work Order # 00257082 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions/modifications to electric power transmission facilities within previously developed area. Location: Covington Substation in King County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In order to provide adequate potable and fire-suppression water to buildings within the Covington Complex, BPA proposes to install approximately 1,500 feet of new potable water line and fire main line. One trench will be dug at a depth of 4-5 feet to carry both new pipes for the

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

USFS Electric Transmission Line Easement Form FS-2700-31 | Open...  

Open Energy Info (EERE)

USFS Electric Transmission Line Easement Form FS-2700-31 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: USFS Electric Transmission...

342

1 INTRODUCTION We consider network protection (NP) by line switch-  

E-Print Network [OSTI]

framework applied to a realistic case study, i.e. the Italian 380kV power transmission grid, are summa as a network of N nodes (substations or buses) and K edges (transmission lines). Two types of buses that minimizes the consequences of cascading failures on an electrical grid. The 380 kV Italian power

Paris-Sud XI, Université de

343

EIS-0474: Southline Transmission Project, Arizona and New Mexico |  

Broader source: Energy.gov (indexed) [DOE]

4: Southline Transmission Project, Arizona and New Mexico 4: Southline Transmission Project, Arizona and New Mexico EIS-0474: Southline Transmission Project, Arizona and New Mexico Summary The Department of the Interior's Bureau of Land Management (BLM) and Department of Energy's Western Area Power Administration (Western) are preparing this EIS as joint lead agencies to evaluate the environmental impacts of the proposed Southline Transmission Project and address associated potential land use plan amendments. The project would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing transmission lines between the Apache and Saguaro, Arizona substations. Project website: http://www.blm.gov/nm/southline.

344

Substation automation problems and possibilities  

SciTech Connect (OSTI)

The evolutionary growth in the use and application of microprocessors in substations has brought the industry to the point of considering integrated substation protection, control, and monitoring systems. An integrated system holds the promise of greatly reducing the design, documentation, and implementation cost for the substation control, protection, and monitoring systems. This article examines the technical development path and the present implementation problems.

Smith, H.L.

1996-10-01T23:59:59.000Z

345

Meteorological conditions associated with the full-span galloping oscillations of overhead transmission lines  

E-Print Network [OSTI]

transmission lines J. C.R. Hunt, M.A., Ph.D., A.F.I.M.A., and M.D. Rowbottom,B.Sc., PhJD., A.F.I.M.A. Indexing transmission lines over a 7-year period have been correlated in the form of histograms of number of faults-span galloping oscillations of ice-accreted bundled overhead transmission lines. The main assumption made

Hunt, Julian

346

Non-transposed, three phase transmission lines: a study of their effect on load voltages.  

E-Print Network [OSTI]

TRANSMISSION LINES A S'PJDY OF THEIR EFFECT ON LOAD VOLTAGES A Thesis By Robert Dean Chenoweth August 1951 NON-TRANSPOSED~ THREE PHASE TRANSMISSION LINES A STUDY OF THEIR EFFECT ON LOAD VOLTAGES A Thesis Submitted to the Faculty of the Agricultural... all large blocks of alternating current power are transmitted from the generating station to the load by means of three phase transmission lines. With present day equipment this method is economical and when ~ properly designed gives very...

Chenoweth, Robert Dean

2012-06-07T23:59:59.000Z

347

GRR/Section 8-HI-a - Transmission Line Approval | Open Energy Information  

Open Energy Info (EERE)

8-HI-a - Transmission Line Approval 8-HI-a - Transmission Line Approval < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-HI-a - Transmission Line Approval 08HIATransmissionLineApproval.pdf Click to View Fullscreen Contact Agencies Hawaii Public Utilities Commission Triggers None specified Click "Edit With Form" above to add content 08HIATransmissionLineApproval.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer must obtain Transmission Line Approval from the Hawaii Public Utilities Commission (PUC) to interconnect a proposed renewable energy project to the existing grid, when new transmission lines are required.

348

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

349

Microsoft Word - Deering Lake-Eckley 115-kV Transmission Line...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Deering Lake-Eckley 115-kV Transmission Line Structure Replacements Yuma County, Colorado 1 A. Brief Description of Proposal: Western Area Power Administration (Western) proposes...

350

EIS-0344: Grand Coulee-Bell 500 kV Transmission Line  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

351

Design of overhead transmission lines subject to localized high intensity wind.  

E-Print Network [OSTI]

??Wind loading considered in the design of overhead transmission lines is based on extreme values of synoptic wind, i.e. boundary layer wind originating from largescale… (more)

Langlois, Sébastien, 1981-

2007-01-01T23:59:59.000Z

352

Mead-Liberty 345-kV Transmission Line Access Road Maintenance...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Mead-Liberty 345-kV Transmission Line Access Road Maintenance and Localized Vegetation Management Maricopa County, Arizona Categorical Exclusion Continuation Sheet Project...

353

Bouse Hills Pumping Plant to Harcuvar 115-kV Transmission Line  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bouse Hills Pumping Plant to Harcuvar 115-kV Transmission Line Inset Structure Installation La Paz County, Arizona Categorical Exclusion Continuation Sheet Special Conditions 1....

354

Blythe-Knob\t161-kV\tTransmission\tLine  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Blythe-Knob 161-kV Transmission Line Maintenance Project - Continuation Sheet Project Description (continued) The proposed project also includes vegetation management in one...

355

Substation asset management study  

SciTech Connect (OSTI)

This paper will present an overview of our recent findings in the area of substation asset management and will describe how several utilities, in response to the issues listed above, are re-examining their present maintenance practices in search of more cost-effective programs.

Conroy, M.W.; Conidi, J. [Sargent & Lundy, Chicago, IL (United States)

1996-03-01T23:59:59.000Z

356

Schultz-Hanford Area Transmission Line Project (DOE-eis-0325)  

Broader source: Energy.gov (indexed) [DOE]

Schultz-Hanford Area Transmission Line Project Schultz-Hanford Area Transmission Line Project Record of Decision March 2003 Bonneville Power Administration Schultz-Hanford Area Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Schultz-Hanford Area Transmission Line Project in Benton, Douglas, Grant, Kittitas, and Yakima Counties, Washington. BPA has decided to implement the Agency Preferred Alternative identified in the Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0325, January 2003), with the exception of Option 1 of the Sickler-Schultz Reroute. Due to landowner concerns, BPA will now implement Option 2 of the Sickler-Schultz Reroute. The Agency Preferred Alternative consists of constructing a new 500-kilovolt (kV) transmission

357

INSTRUMENTATION FOR SURVEYING ACOUSTIC SIGNALS IN NATURAL GAS TRANSMISSION LINES  

SciTech Connect (OSTI)

In the U.S. natural gas is distributed through more than one million miles of high-pressure transmission pipelines. If all leaks and infringements could be detected quickly, it would enhance safety and U.S. energy security. Only low frequency acoustic waves appear to be detectable over distances up to 60 km where pipeline shut-off valves provide access to the inside of the pipeline. This paper describes a Portable Acoustic Monitoring Package (PAMP) developed to record and identify acoustic signals characteristic of: leaks, pump noise, valve and flow metering noise, third party infringement, manual pipeline water and gas blow-off, etc. This PAMP consists of a stainless steel 1/2 inch NPT plumbing tree rated for use on 1000 psi pipelines. Its instrumentation is designed to measure acoustic waves over the entire frequency range from zero to 16,000 Hz by means of four instruments: (1) microphone, (2) 3-inch water full range differential pressure transducer with 0.1% of range sensitivity, (3) a novel 3 inch to 100 inch water range amplifier, using an accumulator with needle valve and (4) a line-pressure transducer. The weight of the PAMP complete with all accessories is 36 pounds. This includes a remote control battery/switch box assembly on a 25-foot extension chord, a laptop data acquisition computer on a field table and a sun shield.

John L. Loth; Gary J. Morris; George M. Palmer; Richard Guiler; Deepak Mehra

2003-09-01T23:59:59.000Z

358

Miter bend loss and higher order mode content measurements in overmoded millimeter-wave transmission lines  

E-Print Network [OSTI]

High power applications require an accurate calculation of the losses on overmoded corrugated cylindrical transmission lines. Previous assessments of power loss on these lines have not considered beam polarization or higher ...

Kowalski, Elizabeth J. (Elizabeth Joan)

2010-01-01T23:59:59.000Z

359

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

79: Grand Coulee's Third Powerplant 500-kV Transmission Line 79: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington Summary This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior's Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011. BPA website: http://efw.bpa.gov/environmental_services/Document_Library/Grand_Coulee/

360

Radio-Frequency Interference (RFI) From Extra-High-Voltage (EHV) Transmission Lines  

E-Print Network [OSTI]

discharges are a design issue. Extra-high-voltage (EHV) transmission lines have operating voltages of 345 kV building a 345-kV transmission line from Red Hill, NM to Deming, NM which would run east along US60 to its with respect to radio noise: (1) lines with voltages below 70 kV and (2) lines with voltages above 110 kV

Ellingson, Steven W.

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Transmission of HIV-1 minority resistant variants and response to first-line antiretroviral therapy  

E-Print Network [OSTI]

1 Transmission of HIV-1 minority resistant variants and response to first-line antiretroviral: Transmission of minority resistant HIV-1 1 Table, 2 Figures Text : 3483 words Abstract : 250 words Presented 2008;22(12):1417-23" DOI : 10.1097/QAD.0b013e3283034953 #12;2 Abstract Background: The transmission

Paris-Sud XI, Université de

362

Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Keeler-to-Tillamook Transmission Line Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment October 2013 This page deliberately left blank. Bonneville Power Administration i Contents Chapter 1 Purpose and Need for Action ............................................................................................ 1-1 1.1 Introduction ................................................................................................................................. 1-1 1.2 Need for Action ............................................................................................................................ 1-1 1.3 Purposes of Action ....................................................................................................................... 1-2

363

Fabrication of curved-line nanostructures on membranes for transmission electron microscopy investigations of domain walls  

E-Print Network [OSTI]

Fabrication of curved-line nanostructures on membranes for transmission electron microscopy, Cambridge CB2 3QZ, United Kingdom Available online 28 February 2006 Abstract We have fabricated curved-line ferromagnetic nanostructures on membranes for transmission electron microscopy investigations of the equilibrium

Dunin-Borkowski, Rafal E.

364

Electric Utility Transmission and Distribution Line Engineering Program  

SciTech Connect (OSTI)

Economic development in the United States depends on a reliable and affordable power supply. The nation will need well educated engineers to design a modern, safe, secure, and reliable power grid for our future needs. An anticipated shortage of qualified engineers has caused considerable concern in many professional circles, and various steps are being taken nationwide to alleviate the potential shortage and ensure the North American power system's reliability, and our world-wide economic competitiveness. To help provide a well-educated and trained workforce which can sustain and modernize the nation's power grid, Gonzaga University's School of Engineering and Applied Science has established a five-course (15-credit hour) Certificate Program in Transmission and Distribution (T&D) Engineering. The program has been specifically designed to provide working utility engineering professionals with on-line access to advanced engineering courses which cover modern design practice with an industry-focused theoretical foundation. A total of twelve courses have been developed to-date and students may select any five in their area of interest for the T&D Certificate. As each course is developed and taught by a team of experienced engineers (from public and private utilities, consultants, and industry suppliers), students are provided a unique opportunity to interact directly with different industry experts over the eight weeks of each course. Course material incorporates advanced aspects of civil, electrical, and mechanical engineering disciplines that apply to power system design and are appropriate for graduate engineers. As such, target students for the certificate program include: (1) recent graduates with a Bachelor of Science Degree in an engineering field (civil, mechanical, electrical, etc.); (2) senior engineers moving from other fields to the utility industry (i.e. paper industry to utility engineering or project management positions); and (3) regular working professionals wishing to update their skills or increase their knowledge of utility engineering design practices and procedures. By providing graduate educational opportunities for the above groups, the T&D Program will help serve a strong industry need for training the next generation of engineers in the cost-effective design, construction, operation, and maintenance of modern electrical transmission and distribution systems. In addition to developing the on-line engineering courses described above, the T&D Program also focused significant efforts towards enhancing the training opportunities available to power system operators in the northwest. These efforts have included working with outside vendors to provide NERC-approved training courses in Gonzaga University's (GU) system operator training facility, support for an accurate system model which can be used in regional blackstart exercises, and the identification of a retired system operator who could provide actual regional training courses. The GU system operator training facility is also being used to recruit young workers, veterans, and various under-represented groups to the utility industry. Over the past three years students from Columbia Gorge Community College, Spokane Falls Community College, Walla Walla Community College, Central Washington University, Eastern Washington University, Gonzaga University, and various local high schools have attended short (one-day) system operator training courses free of charge. These collaboration efforts has been extremely well received by both students and industry, and meet T&D Program objectives of strengthening the power industry workforce while bridging the knowledge base across power worker categories, and recruiting new workers to replace a predominantly retirement age workforce. In the past three years the T&D Program has provided over 170 utility engineers with access to advanced engineering courses, been involved in training more than 300 power system operators, and provided well over 500 college and high school students with an experienc

Peter McKenny

2010-08-31T23:59:59.000Z

365

EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

366

EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild  

Broader source: Energy.gov (indexed) [DOE]

17: Lovell-Yellowtail and Basin-Lovell Transmission Line 17: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana Summary DOE's Western Area Power Administration prepared this EA and a finding of no significant impact for a proposal to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kV transmission lines, located in Big Horn County, Wyoming, and Big Horn and Carbon Counties in Montana, and the Basin-Lovell 115-kV transmission line in Big Horn County, Wyoming. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

367

DOE/EA-1485: Environmental Assessment for the Nisqually Transmission Line Relocation Project (January 2005)  

Broader source: Energy.gov (indexed) [DOE]

Nisqually Transmission Line Relocation Project Nisqually Transmission Line Relocation Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1485 Bonneville Power Administration January 2005 Nisqually Transmission Line Relocation Project Revision Sheet for Final Environmental Assessment 1 Revision Sheet for the Nisqually Transmission Line Relocation Project Final Environmental Assessment DOE/EA -1485 Summary This revision sheet documents the changes to be incorporated into the Nisqually Transmission Line Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On October 18, 2004, the Preliminary EA was sent to agencies and interested parties. Notification

368

Omega transmission lines with applications to effective medium models of metamaterials  

Science Journals Connector (OSTI)

In this paper we introduce the concept of transmission lines with inherent bi-anisotropy and establish an analogy between these lines and volumetric bi-anisotropic materials. In particular we find under what conditions a periodically loaded transmission line can be treated as an effective omega medium. Two example circuits are introduced and analyzed. The results have two-fold implications: opening a route to emulate electromagnetic properties of bi-anisotropic omega media using transmission-line meshes and understanding and improving effective medium models of composite materials with the use of effective circuit models of unit cells.

2014-01-01T23:59:59.000Z

369

Omega Transmission Lines with Applications to Effective Medium Models of Metamaterials  

E-Print Network [OSTI]

In this paper we introduce the concept of transmission lines with inherent bi-anisotropy and establish an analogy between these lines and volumetric bi-anisotropic materials. In particular, we find under what conditions a periodically loaded transmission line can be treated as an effective omega medium. Two example circuits are introduced and analyzed. The results have two-fold implications: opening a route to emulate electromagnetic properties of bi-anisotropic omega media using transmission-line meshes and understanding and improving effective medium models of composite materials with the use of effective circuit models of unit cells.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

370

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

371

IEEE TRANSACTIONS ON ELECTRON DEVICES, VOL. 53, NO. 2, FEBRUARY 2006 235 De-Embedding Transmission Line Measurements for  

E-Print Network [OSTI]

of parasitic structures from transmission line measurements is presented and applied to microstrip lines technologies, integrated circuits, interconnect, losses, microstrip lines, slotted ground planes, transmission comparable to on-chip component dimensions. Hence, transmission lines play an in- creasingly vital role

Voinigescu, Sorin Petre

372

The different impedances needed for the suspended coaxial transmission line can be achieved by varying the size of the centre  

E-Print Network [OSTI]

The different impedances needed for the suspended coaxial transmission line can be achieved conductor of the resulting suspended coaxial transmission line is shown in Figure 2(a), with the cross-sections of the 50 line and the stubs shown in Figure 2(b). The input and output of the suspended transmission line

Terry, Fred L.

373

EIS-0166: Bangor Hydro-Electric Transmission Line, Maine  

Broader source: Energy.gov [DOE]

The Department of Energy prepared this environmental impact statement while considering whether to authorize a Presidential permit for Bangor Hydro to construct a new electric transmission facility at the U.S. border with Canada.

374

AC transmission system planning choosing lines from a discrete set  

E-Print Network [OSTI]

Transmission system planning (TSP) is a difficult nonlinear optimization problem involving non-convex quadratic terms, as well as discrete variables. We extend prior results for linear relaxations, drawing on a preliminary ...

Gilbertson, Eric W.

2013-04-24T23:59:59.000Z

375

Kangley - Echo Lake Transmission Line Project, Supplemental Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration P.O. Box 491 Vancouver, Washington 98666-0491 TRANSMISSION BUSINESS LINE January 14, 2003 In reply refer to: T-DITT-2 To: People Interested in the Kangley-Echo Lake Transmission Line Project Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives. This letter provides

376

Cutting costs through substation ownership  

SciTech Connect (OSTI)

The term applied to service through a customer-owned main substation is primary service, and such customers are billed at primary metering rates. These terms denote that the customer accepts service (and billing metering is located) on the primary, rather than secondary, side of the main transformer. Some electric utilities are prepared to offer extremely attractive billing reductions to those customers willing to invest in their own main substations instead of renting a substation purchased with utility company capital. Depending on the utility and the particular circumstances, some plants can recover their investment in primary substation equipment in as little as 1 or 2 years.

Keithly, D. (ABB Electric, Waukesba, WI (US))

1989-06-22T23:59:59.000Z

377

THE COUNCIL OF STATE GOVERNMENTS THE ELECTRIC TRANSMISSION LINE SITING COMPACT  

Broader source: Energy.gov (indexed) [DOE]

COUNCIL OF STATE GOVERNMENTS COUNCIL OF STATE GOVERNMENTS THE ELECTRIC TRANSMISSION LINE SITING COMPACT LEGISLATIVE BRIEFING Background and Summary Background and Need The siting of interstate transmission lines has long been a problem that has vexed both states and the federal government. With the expected growth in electricity demand, coupled with the need to bring renewable energy to market and the necessity to enhance and secure the nation's energy infrastructure, the need for added transmission capacity has never been more apparent. National need and parochial interests, however, often do not align and have led to an underdeveloped and overstressed electricity transmission system.

378

EIS-0486: Plains & Eastern Clean Line Transmission Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

86: Plains & Eastern Clean Line Transmission Project 86: Plains & Eastern Clean Line Transmission Project EIS-0486: Plains & Eastern Clean Line Transmission Project SUMMARY This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA). PUBLIC COMMENT OPPORTUNITIES None available at this time.

379

Josephson junction-embedded transmission-line resonators: from Kerr medium to in-line transmon  

E-Print Network [OSTI]

We provide a general method to find the Hamiltonian of a linear circuit in the presence of a nonlinearity. Focussing on the case of a Josephson junction embedded in a transmission-line resonator, we solve for the normal modes of the system by taking into account exactly the effect of the quadratic (i.e. inductive) part of the Josephson potential. The nonlinearity is then found to lead to self and cross-Kerr effect, as well as beam-splitter type interactions between modes. By adjusting the parameters of the circuit, the Kerr coefficient K can be made to reach values that are weak (K \\kappa) or even very strong (K >> \\kappa) with respect to the photon-loss rate \\kappa. In the latter case, the resonator+junction circuit corresponds to an in-line version of the transmon. By replacing the single junction by a SQUID, the Kerr coefficient can be tuned in-situ, allowing for example the fast generation of Schr\\"odinger cat states of microwave light. Finally, we explore the maximal strength of qubit-resonator coupling...

Bourassa, J; Gambetta, Jay M; Blais, A

2012-01-01T23:59:59.000Z

380

Implications, Monitoring, and Control of Accidental Transmission of Lymphocytic Choriomeningitis Virus within Hamster Tumor Cell Lines  

Science Journals Connector (OSTI)

...communication). These lines included duodenal, pmostatic...various rat and mouse tumor lines (P. D. Walter, personal...supplier of such tumor cell lines stopped distribution...Factors influencing the transmission of LCM infection to humans...been implicated as 1 route (4, 7, 19). The...

Robert J. Biggar; Rudolf Deibel; and John P. Woodall

1976-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

HEMP-induced transients in electric power substations. Final report  

SciTech Connect (OSTI)

A nuclear detonation in or above the earth`s atmosphere produces an intense electromagnetic pulse (EMP). A large portion of the EMP electromagnetic energy is within the RF spectrum. A detonation at high altitudes above 40 km produces an EMP called high-altitude EMP (HEMP). HEMP is a steep-front short duration transient with a rise time on the order of a few nanoseconds which decays to near zero in less than a microsecond. A single high-altitude burst can subject much of the continental United States to intense HEMP electric fields on the order of tens of kilovolts per meter. The intense transient HEMP will induce fast transients in high-voltage transmission lines and bus structures, instrumentation cables, and control wires in power transmission and distribution (T & D) substations. A system of traveling wave coupling models for a 500 kV substation, including models for the high voltage primary bus, components (circuit breakers, disconnect switches, power transformers, and current and voltage instrument transformers), low voltage control wiring circuits, and a number of conducted and radiated interference coupling modes, had been developed earlier by EPRI. These EPRI served as the baseline for the present HEMP coupling investigations. The HEMP effects on protective relays were assessed for a nominal HEMP environment using several new field coupling models merged with the switching transient data. It is found that a representative solid state relay is unlikely to be damaged or to misoperate by the nominal HEMP threat with a peak field strength of 50 kV/m. However, it is possible for both DC control wires to flash over to ground simultaneously, causing fuses to blow and placing the relay in an inoperative state.

Wiggins, C.M.; Thomas, D.E.; Salas, T.M. [BDM International, Inc., Albuquerque, NM (United States)

1992-02-01T23:59:59.000Z

382

HEMP-induced transients in electric power substations  

SciTech Connect (OSTI)

A nuclear detonation in or above the earth's atmosphere produces an intense electromagnetic pulse (EMP). A large portion of the EMP electromagnetic energy is within the RF spectrum. A detonation at high altitudes above 40 km produces an EMP called high-altitude EMP (HEMP). HEMP is a steep-front short duration transient with a rise time on the order of a few nanoseconds which decays to near zero in less than a microsecond. A single high-altitude burst can subject much of the continental United States to intense HEMP electric fields on the order of tens of kilovolts per meter. The intense transient HEMP will induce fast transients in high-voltage transmission lines and bus structures, instrumentation cables, and control wires in power transmission and distribution (T D) substations. A system of traveling wave coupling models for a 500 kV substation, including models for the high voltage primary bus, components (circuit breakers, disconnect switches, power transformers, and current and voltage instrument transformers), low voltage control wiring circuits, and a number of conducted and radiated interference coupling modes, had been developed earlier by EPRI. These EPRI served as the baseline for the present HEMP coupling investigations. The HEMP effects on protective relays were assessed for a nominal HEMP environment using several new field coupling models merged with the switching transient data. It is found that a representative solid state relay is unlikely to be damaged or to misoperate by the nominal HEMP threat with a peak field strength of 50 kV/m. However, it is possible for both DC control wires to flash over to ground simultaneously, causing fuses to blow and placing the relay in an inoperative state.

Wiggins, C.M.; Thomas, D.E.; Salas, T.M. (BDM International, Inc., Albuquerque, NM (United States))

1992-02-01T23:59:59.000Z

383

Monitoring voltage collapse margin with synchrophasors across transmission corridors with multiple lines and multiple contingencies  

E-Print Network [OSTI]

We use synchrophasor measurements of the complex voltage and current at both ends of multiple transmission lines that connect areas of a power system to monitor the online voltage collapse margin. A new reduction is used to reduce the multiple transmission lines to a single line equivalent and determine how to combine the synchrophasor measurements. Generator reactive power limits can be accommodated. The results show that this methodology can capture the effect of multiple contingencies inside the transmission corridors, giving awareness to the operators about the severity of contingencies with respect to voltage stability.

Ramirez, Lina

2014-01-01T23:59:59.000Z

384

Sensor, method and system of monitoring transmission lines  

SciTech Connect (OSTI)

An apparatus, method, and system for measuring the magnetic field produced by phase conductors in multi-phase power lines. The magnetic field measurements are used to determine the current load on the conductors. The magnetic fields are sensed by coils placed sufficiently proximate the lines to measure the voltage induced in the coils by the field without touching the lines. The x and y components of the magnetic fields are used to calculate the conductor sag, and then the sag data, along with the field strength data, can be used to calculate the current load on the line and the phase of the current. The sag calculations of this invention are independent of line voltage and line current measurements. The system applies a computerized fitter routine to measured and sampled voltages on the coils to accurately determine the values of parameters associated with the overhead phase conductors.

Syracuse, Steven J.; Clark, Roy; Halverson, Peter G.; Tesche, Frederick M.; Barlow, Charles V.

2012-10-02T23:59:59.000Z

385

500-kV Central Ferry Substation ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Central Ferry Substation in Garfield County, Wash., to BPA's 500-kV Lower Monumental Substation in Walla Walla County, Wash. BPA is currently considering two routing...

386

CYBER SECURITY OF SUBSTATION AUTOMATION SYSTEMS .  

E-Print Network [OSTI]

??Cyber intrusions into substations of a power grid are a source of vulnerability since most substations are unmanned and with limited protection of the cyber… (more)

[No author

2014-01-01T23:59:59.000Z

387

Substation automation gains momentum with modern options  

SciTech Connect (OSTI)

This paper discusses issues associated with utility substation automation. Monitoring equipment for monitoring power flow, quality, and harmonics for three substations simultaneously is described.

Beaty, W.

1996-12-01T23:59:59.000Z

388

Calculation of electric field and audible noise from transmission lines with non-parallel conductors  

SciTech Connect (OSTI)

In order to investigate the feasibility of using new transmission line configurations with non-parallel conductors, for managing magnetic field in critical areas, techniques are needed to assess the effects of different three-dimensional line arrangements on other important design parameters. A new method for calculation of electric field and corona-generated audible noise from non-parallel conductors is described and implemented as a computer tool. This method uses linearly varying line charges to simulate charge distribution along the axial direction of the transmission line. New algorithms are developed for calculating electric field and audible noise due to non-uniform line charges and illustrated by examples of low magnetic field transmission line designs.

Liu, Y. [Virginia Tech, Blacksburg, VA (United States)] [Virginia Tech, Blacksburg, VA (United States); Zaffanella, L.E. [Enertech Consultants, Lee, MA (United States)] [Enertech Consultants, Lee, MA (United States)

1996-07-01T23:59:59.000Z

389

Substation grounding programs  

SciTech Connect (OSTI)

The five volume report comprises the user manual, installation, and validation manual and an applications guide for the SGA (Substation Grounding Analysis) software package. SGA consists of four computer programs: (1) SOMIP, (2) SMECC, (3) SGSYS, and (4) TGRND. The first three programs provide a comprehensive analysis tool for the design of substation grounding systems to meet safety standards. The fourth program, TGRND, provides a state of the art analysis tool for computing transient ground potential rise and ground system impedance. This part of the report, Volume 1, is a users manual and an installation and validation manual for the computer program SOMIP (SOil Measurement Interpretation Program). This program computes the best estimate of the parameters of a two layer soil model from usual soil resistivity measurements. Four pin or three pin soil measurements can be accommodated. In addition, it provides error bounds on the soil parameters for a given confidence level. The users manual describes data requirements and data preparation procedures. The installation and validation manual describes the computer files which make up the program SOMIP and provides two test cases for validation purposes. 4 refs.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). School of Electrical Engineering)

1992-05-01T23:59:59.000Z

390

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

50: Grand Coulee-Creston Transmission Line Rebuild; Grant and 50: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington SUMMARY Bonneville Power Administration is preparing this EA to assess the potential environmental impacts of the proposed rebuild of approximately 28 miles of transmission line between the cities of Coulee Dam in Grant County and Creston in Lincoln County, Washington. The proposed project would include replacing all wood pole structures and conductor, improving existing access roads, and developing temporary access roads. Additional information is available at the project website: http://www.bpa.gov/goto/CouleeCrestonRebuild. PUBLIC COMMENT OPPORTUNITIES Draft EA: Comment Period Ends 2/3/14.

391

Adaptive neurofuzzy inference system-based pollution severity prediction of polymeric insulators in power transmission lines  

Science Journals Connector (OSTI)

This paper presents the prediction of pollution severity of the polymeric insulators used in power transmission lines using adaptive neurofuzzy inference system (ANFIS) model. In this work, laboratory-based pollution performance tests were carried out ...

C. Muniraj; S. Chandraseka

2011-01-01T23:59:59.000Z

392

EIS-0332: McNary-John Day Transmission Line Project, OR  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

393

Electronically controllable transmission line design for traveling wave array antenna feed network  

E-Print Network [OSTI]

In this thesis, an electronically controllable transmission line (ECTL) is presented. By modulating the conductivity of a doped Si modulator in the ECTL, the wave propagation constant in the ECTL is controlled. Measured results show a phase...

Shin, Chang-Seok

2012-06-07T23:59:59.000Z

394

Effects of un-transposed UHV transmission line on fault analysis of power systems  

Science Journals Connector (OSTI)

The conventional fault analysis method based on symmetrical components supposes that the three-phase parameters of un-transposed transmission line are symmetrical in case of fault. The errors caused by the method...

Anning Wang ???; Qing Chen ? ?; Zhanping Zhou ???

2008-06-01T23:59:59.000Z

395

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

396

Regulations for Gas Transmission Lines Less than Ten Miles Long (New York)  

Broader source: Energy.gov [DOE]

Any person who wishes to construct a gas transmission line that is less than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of...

397

Montana ARM 17.20.1606, Electric Transmission Lines, Need Standard...  

Open Energy Info (EERE)

0.1606, Electric Transmission Lines, Need Standard Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Montana ARM 17.20.1606,...

398

EIS-0399: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line  

Broader source: Energy.gov [DOE]

DOE, jointly with the Montana Department of Environmental Quality (MDEQ), prepared an EIS that evaluated the potential environmental impacts of a proposed international transmission line that would cross the U.S.-Canada border in northwest Montana.

399

EIS-0078: Jonesboro-Hergett 161-kV Transmission Line  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Southwestern Power Administration developed this statement to assess the environmental and socioeconomic impacts of a 161-kilovolt transmission line in Craighead County, Arkansas, including its proposed and alternate routes.

400

Grounding of a 230 kV Transmission line over a Limestone Ridge.  

E-Print Network [OSTI]

?? This thesis is a case study of a 230 kV transmission line in Lao P.D.R. Grounding of electrical systems is essential for safety and… (more)

Grubbström, Emma

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

402

Polarizer with Nonrectangular Grooves in the HE11 Mode Transmission Line  

Science Journals Connector (OSTI)

This paper presents experimental results on polarizers with nonrectangular grooves to be used in high power millimeter wave transmission lines for electron cyclotron heating (ECH) of fusion plasmas. A low-powe...

K. Nagasaki; Y. Itoh; H. Morioka; T. Obiki

1999-05-01T23:59:59.000Z

403

Substation alarm multiplexing system (SAMS)  

SciTech Connect (OSTI)

This paper describes an on going R&D project to develop, design, install, and assess the field performance of an advanced substation alarm system. SAMS provides a highly fault-tolerant system for the reporting of equipment alarms. SAMS separates and identifies each of the multiple alarm contacts, transmits an alarm condition over existing substation two-wire system, and displays the alarm source, and its associated technical information, on a touch-screen monitor inside the substation control room, and a remote central location and on a hand held terminal which may be carried anywhere within the substation. SAMS is currently installed at the Sherman Creek substation in the Bronx for the purpose of a three month field evaluation.

ElBadaly, H.; Gaughan, J.; Ward, G.; Amengual, S.

1996-03-01T23:59:59.000Z

404

736 IEEE TRANSACTIONS ON ADVANCED PACKAGING, VOL. 28, NO. 4, NOVEMBER 2005 Simulation of Lossy Package Transmission Lines  

E-Print Network [OSTI]

Package Transmission Lines Using Extracted Data From One-Port TDR Measurements and Nonphysical RLGC Models, the frequency-dependent characteristic impedance and propagation constant of lossy transmission lines have been ( ), conductance ( ) and capacitance ( ) (RLGC) models have been developed for simulating lossy transmission lines

Swaminathan, Madhavan

405

Power Transmission Lines: A New Interconnect Design to Eliminate Simultaneous Switching Noise A. Ege Engin and Madhavan Swaminathan  

E-Print Network [OSTI]

Power Transmission Lines: A New Interconnect Design to Eliminate Simultaneous Switching Noise A occurs at discontinuities of the transmission line, wherever there is an interruption of the current that is connected to a transmission line. To reduce this discontinuity, current designs try to maintain a low

Swaminathan, Madhavan

406

The mesa merging oxidation method for creating low-loss dielectrics and transmission lines on low-resistivity silicon  

E-Print Network [OSTI]

The mesa merging oxidation method for creating low-loss dielectrics and transmission lines on low.1088/0960-1317/21/6/065020 The mesa merging oxidation method for creating low-loss dielectrics and transmission lines on low steps to create high aspect ratio coplanar waveguide (hicoplanar) transmission lines. The large SiO2

Bowers, John

407

Simulation of Eye-Diagrams on Lossy Transmission Lines using Extracted Data from 1-port TDR Measurements  

E-Print Network [OSTI]

Simulation of Eye-Diagrams on Lossy Transmission Lines using Extracted Data from 1-port TDR of transmission lines were measured from 1- port TDR measurements. Using the extracted data, eye- diagrams of lossy transmission lines were simulated based on a non-physical RLGC model. Conventional W element

Swaminathan, Madhavan

408

Topology and Design of Wide-Band 3D Metamaterials made of Periodically Loaded Transmission Line Arrays  

E-Print Network [OSTI]

Topology and Design of Wide-Band 3D Metamaterials made of Periodically Loaded Transmission Line index over a wide frequency band. These metamaterials consist of a three- dimensional transmission line and permeability. The cubic-cell transmission line host network is a physical realization of the 3D distributed

Tentzeris, Manos

409

Application of the Transmission Line Matrix method for outdoor sound propagation modelling Part 2: Experimental validation using  

E-Print Network [OSTI]

Application of the Transmission Line Matrix method for outdoor sound propagation modelling ­ Part 2 Received in revised form 9 July 2013 Accepted 23 July 2013 Keywords: Meso-NH Transmission Line Matrix model-domain acoustic model is based on the Transmission Line Matrix method. Its develop- ment has also been promoted

Ribes, Aurélien

410

IEEE TRANSACTIONS ON MICROWAVE THEORY AND TECHNIQUES, VOL. 45, NO. 6, JUNE 1997 939 Characteristics of Coplanar Transmission Lines on  

E-Print Network [OSTI]

of Coplanar Transmission Lines on Multilayer Substrates: Modeling and Experiments Erli Chen and Stephen Y. Chou, Senior Member, IEEE Abstract-- Characteristics of coplanar transmission lines on multilayer of these for- mulas has been verified experimentally on a variety of copla- nar transmission lines using

411

650 IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 26, NO. 2, APRIL 2011 Hourly Scheduling of DC Transmission Lines in  

E-Print Network [OSTI]

Transmission Lines in SCUC With Voltage Source Converters Azim Lotfjou, Mohammad Shahidehpour, Fellow, IEEE transmission lines, se- curity-constrained unit commitment, voltage-source converters. NOMENCLATURE Index of ac;LOTFJOU et al.: HOURLY SCHEDULING OF DC TRANSMISSION LINES 651 , Vector of real and reactive power

Fu, Yong

412

1076 IEEE TRANSACTIONS ON SMART GRID, VOL. 4, NO. 2, JUNE 2013 Wireless Network Design for Transmission Line  

E-Print Network [OSTI]

for Transmission Line Monitoring in Smart Grid Benazir Fateh, Student Member, IEEE, Manimaran Govindarasu, Senior wireless link behavior, non-uniform cellular coverage, etc. Our analysis shows that a transmission line need to equip the age old transmission line infrastruc- ture with a high-performance data communication

Manimaran, Govindarasu

413

Nonlinear control of a coupled PDE/ODE system modeling a switched power converter with a transmission line  

E-Print Network [OSTI]

with a transmission line Jamal Daafouz, Marius Tucsnak and Julie Valein Avril 2014 Abstract We consider an infinite dimensional system modeling a boost converter connected to a load via a transmission line. The governing.tucsnak@univ-lorraine.fr, julie.valein@univ-lorraine.fr 1 #12;converters connected to transmission lines is a very difficult task

Valein, Julie - Institut de Mathématiques �lie Cartan, Université Henri Poincaré

414

Hyperbolic transmission-line metamaterials Alyona V. Chshelokova, Polina V. Kapitanova, Alexander N. Poddubny, Dmitry S. Filonov, Alexey P.  

E-Print Network [OSTI]

Hyperbolic transmission-line metamaterials Alyona V. Chshelokova, Polina V. Kapitanova, Alexander N by the AIP Publishing Articles you may be interested in Omega transmission lines with applications verification of field rotating with invisibility by full tensor transmission-line metamaterials Appl. Phys

415

Renewable portfolio standards, Greenhouse gas reduction, and Long-Line transmission investments in the WECC  

SciTech Connect (OSTI)

New, long-distance transmission lines to remote areas with concentrations of high-quality renewable resources can help western states meet the challenges of increasing renewable energy procurement and reducing greenhouse gas emissions more cost-effectively than reliance on local resources alone. The approach applied here to the Western Electricity Coordinating Council is useful for an initial determination of the net benefits of long-line transmission between regions with heterogeneous resource quality. (author)

Olson, Arne; Orans, Ren; Allen, Doug; Moore, Jack; Woo, C.K.

2009-11-15T23:59:59.000Z

416

Quantum Theory of Transmission Line Resonator-Assisted Cooling of a Micromechanical Resonator  

E-Print Network [OSTI]

We propose a quantum description of the cooling of a micromechanical flexural oscillator by a one-dimensional transmission line resonator via a force that resembles cavity radiation pressure. The mechanical oscillator is capacitively coupled to the central conductor of the transmission line resonator. At the optimal point, the micromechanical oscillator can be cooled close to the ground state, and the cooling can be measured by homodyne detection of the output microwave signal.

Yong Li; Ying-Dan Wang; Fei Xue; C. Bruder

2008-04-30T23:59:59.000Z

417

INSITE: An emerging standard for substation monitoring  

SciTech Connect (OSTI)

The functions of the INSITE Substation Apparatus Monitoring System can be broken into two, somewhat arbitrary categories. (1) Data acquisition, storage and communications, (2) Data analysis and apparatus condition assessment. We have defined the first set of functions as comprising the {open_quotes}platform{close_quotes}, the second as an {open_quotes}application{close_quotes}. We have made the distinction to encourage users to contemplate other possible {open_quotes}applications{close_quotes} which may be implemented using the platform. The intent of this paper is to describe in detail the platform functions. The requirements for the platform derive from several overall goals of a substation apparatus monitoring system: (1) Comprehensive: The ability to monitor all important types of substation apparatus, combined with all the tools - the sensors, the Data Acquisition Unit, and the analysis and communications software - for an on-line, real-time condition assessment of your equipment, with critical information at everyone`s fingertips. (2) Dependable: Built-in self-diagnosis that assures optimum system performance. (3) Reliable: From an extremely hot to extremely cold environment, capable of functioning reliably in electrically noisy substations. (4) Expandable: Easily upgradable to accommodate additional sensors available today and any new types developed tomorrow - as well as new software, for monitoring other equipment down the road. (5) Open: The ability to accept non-Doble supplied sensors - with future capability for integrating RS-232-compatible intelligent sensors. (6) Complementary: Compatibility with existing DTA technology, for example, making comparison of both out-of-service and in-service data possible. (7) Easy-to-Use: A Windows application with user-friendly pull-down menus, simple icons and buttons, and dialog sessions that can be mastered easily. On-line Help is also available. (8) Lowest possible cost.

Woodward, R.C. [Doble Engineering Company, Watertown, MA (United States)

1996-03-01T23:59:59.000Z

418

EA-1982: Parker-Davis Transmission System Programmatic Operations and Maintenance Project; Arizona, California, and Nevada  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

419

Design of the Wireless Temperature Measurement Alarming System in the High-Voltage Transformer Substation  

Science Journals Connector (OSTI)

Due to electric power overload and equipment aging, fire and explosion occur at transmission circuitry joints in high-voltage transformer substation caused by high temperatures accumulated at these...

Qiang Gao; Hongli Wang; Huaxiang Wang

2008-01-01T23:59:59.000Z

420

EIS-0118: Proposed Eugene-Medford 500-kV Transmission Line  

Broader source: Energy.gov [DOE]

The U.S. Department of Interior developed this statement to assess the environmental impact of a proposed 500-kilovolt transmission line linking Eugene and Medford, Oregon, that would cross through public lands. The Bonneville Power Administration (BPA) would provide service to the proposed line and is a cooperating agency in the statement. BPA adopted the EIS on 7/10/1985.

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Recent developments in subtransmission substations  

SciTech Connect (OSTI)

Equipment is described which offers the utility engineer flexibility in the layout and location of substations. It is possible with these designs to place HV connected substations directly into load centers and reduce the losses with connections at a lower voltage level. An added advantage of these designs are reduced expenses for engineering, site preparation, foundations, installation and interest payments due to the shorter time between equipment delivery and possible energization of a substation. Reduced maintenance, longer maintenance intervals, small gas leakage, are built-in advantages of this equipment.

Watson, P.W.; Leibold, A.A.; Koglin, B.B.

1980-05-01T23:59:59.000Z

422

Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick  

SciTech Connect (OSTI)

This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

NONE

1993-10-01T23:59:59.000Z

423

Big Eddy-Knight Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPA's existing Big Eddy Substation in The Dalles, Oregon, to a proposed new Knight Substation that would be connected to an existing BPA line about 4 miles northwest of...

424

Electric power substation capital costs  

SciTech Connect (OSTI)

The displacement or deferral of substation equipment is a key benefit associated with several technologies that are being developed with the support of the US Department of Energy`s Office of Utility Technologies. This could occur, for example, as a result of installing a distributed generating resource within an electricity distribution system. The objective of this study was to develop a model for preparing preliminary estimates of substation capital costs based on rudimentary conceptual design information. The model is intended to be used by energy systems analysts who need ``ballpark`` substation cost estimates to help establish the value of advanced utility technologies that result in the deferral or displacement of substation equipment. This cost-estimating model requires only minimal inputs. More detailed cost-estimating approaches are recommended when more detailed design information is available. The model was developed by collecting and evaluating approximately 20 sets of substation design and cost data from about 10 US sources, including federal power marketing agencies and private and public electric utilities. The model is principally based on data provided by one of these sources. Estimates prepared with the model were compared with estimated and actual costs for the data sets received from the other utilities. In general, good agreement (for conceptual level estimating) was found between estimates prepared with the cost-estimating model and those prepared by the individual utilities. Thus, the model was judged to be adequate for making preliminary estimates of typical substation costs for US utilities.

Dagle, J.E.; Brown, D.R.

1997-12-01T23:59:59.000Z

425

Experimental verification of the key properties of a three-dimensional isotropic transmission line based superlens  

E-Print Network [OSTI]

Design and experimental realization of a three-dimensional superlens based on LC-loaded transmission lines are presented. Commercially available components and materials are used in the design. Transmission properties of the designed structure are studied experimentally and the observed lens properties are compared with analytical predictions. Backward-wave propagation and amplification of evanescent waves in the prototype structure are verified both analytically and experimentally.

Pekka Alitalo; Stanislav Maslovski; Sergei Tretyakov

2006-01-10T23:59:59.000Z

426

Power Line Communication as a Transmission Medium for OpenADR Signals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Line Communication as a Transmission Medium for OpenADR Signals Power Line Communication as a Transmission Medium for OpenADR Signals Speaker(s): Javier Matanza Domingo Date: December 14, 2011 - 1:30pm Location: 90-3075 Seminar Host/Point of Contact: Maya Minamihara Power Line Communication (PLC) is currently considered an emerging technology and is attracting the attention of the scientific community due to the promise of new ways to transmit information. Since this transmission path reaches wherever electricity is present, one of the main motivations is its use in all kinds of energy-related applications. Some examples are: remote-metering, remote-control and demand management. However, not everything about PLC is advantageous, due to the fact that it uses a physical media, which was not designed for transmit information, and it

427

Non-Linear Transmission Line (NLTL) Microwave Source Lecture Notes the United States Particle Accelerator School  

SciTech Connect (OSTI)

We will quickly go through the history of the non-linear transmission lines (NLTLs). We will describe how they work, how they are modeled and how they are designed. Note that the field of high power, NLTL microwave sources is still under development, so this is just a snap shot of their current state. Topics discussed are: (1) Introduction to solitons and the KdV equation; (2) The lumped element non-linear transmission line; (3) Solution of the KdV equation; (4) Non-linear transmission lines at microwave frequencies; (5) Numerical methods for NLTL analysis; (6) Unipolar versus bipolar input; (7) High power NLTL pioneers; (8) Resistive versus reactive load; (9) Non-lineaer dielectrics; and (10) Effect of losses.

Russell, Steven J. [Los Alamos National Laboratory; Carlsten, Bruce E. [Los Alamos National Laboratory

2012-06-26T23:59:59.000Z

428

Substation grounding programs  

SciTech Connect (OSTI)

This document is a users manual and applications guide for the software package SGA. This package comprises four computer programs, namely SOMIP, SMECC, SGSYS, and TGRND. The first three programs are analysis models which are to be used in the design process of substation grounding systems. The fourth program, TGRND, is an analysis program for determining the transient response of a grounding system. It can be used to compute transient ground potential rise due to lightning or switching, and the ground impedance (i.e. resistance and reactance) at specified frequencies. This report, Volume 4, is a users manual and an installation and validation manual for the computer program TGRND (Transient GRouNDing System Analysis Program). This program computes transient ground potential rise resulting from lightning, switching, or other transient electric currents injected to a grounding system. The program also computes the impedance (i.e. resistance and reactance) of a grounding system as a function of frequency. This program can be utilized in an interactive or batch mode. The users manual describes data requirements and data preparation procedures. The installation and validation manual describes the computer files which make up the program TGRND and provides a test case for validation purposes.

Meliopoulos, A.P.S. (Georgia Inst. of Tech., Atlanta, GA (United States). Electric Power Lab.)

1992-05-01T23:59:59.000Z

429

EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Plan  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

430

Controlled generation of field squeezing with cold atomic clouds coupled to a superconducting transmission line resonator  

SciTech Connect (OSTI)

We propose an efficient method for controlled generation of field squeezing with cold atomic clouds trapped close to a superconducting transmission line resonator. It is shown that, based on the coherent strong magnetic coupling between the collective atomic spins and microwave fields in the transmission line resonator, two-mode or single-mode field squeezed states can be generated through coherent control on the dynamics of the system. The degree of squeezing and preparing time can be directly controlled through tuning the external classical fields. This protocol may offer a promising platform for implementing scalable on-chip quantum information processing with continuous variables.

Li Pengbo; Li Fuli [MOE Key Laboratory for Nonequilibrium Synthesis and Modulation of Condensed Matter, Department of Applied Physics, Xi'an Jiaotong University, Xi'an 710049 (China)

2010-03-15T23:59:59.000Z

431

Measuring Hawking Radiation of a Kerr-Newman Black Hole in a Superconducting Transmission Line  

E-Print Network [OSTI]

Applying a dimensional reduction technique and a coordinates transformation approach, we deduce the Kerr-Newman space-time into a Painlev\\'{e}-like form, and obtain its corresponding event horizon and the Hawking radiation temperature. We find that, the event horizon of a Kerr-Newman black hole can be simulated in a superconducting transmission line. Moreover, by running some numerical simulation, we confirm that the Hawking radiation of a Kerr-Newman Black Hole can be experimentally measured in a superconducting transmission line.

X. G. Lan; D. Y. Chen; L. F. Wei

2014-01-15T23:59:59.000Z

432

Controlled generation of field squeezing with cold atomic clouds coupled to a superconducting transmission line resonator  

E-Print Network [OSTI]

We propose an efficient method for controlled generation of field squeezing with cold atomic clouds trapped close to a superconducting transmission line resonator. It is shown that, based on the coherent strong magnetic coupling between the collective atomic spins and microwave fields in the transmission line resonator, two-mode or single mode field squeezed states can be generated through coherent control on the dynamics of the system. The degree of squeezing and preparing time can be directly controlled through tuning the external classical fields. This protocol may offer a promising platform for implementing scalable on-chip quantum information processing with continuous variables.

Peng-Bo Li; Fu-Li Li

2010-02-26T23:59:59.000Z

433

Calculation of large ion densities under HVdc transmission lines by the finite difference method  

SciTech Connect (OSTI)

A calculation method for large ion densities (charged aerosols) under HVdc transmission lines was developed considering both the charging mechanism of aerosols by small ions and the drifting process by wind. Large ion densities calculated by this method agreed well with the ones measured under the Shiobara HVdc test line on the lateral profiles at ground level up to about 70m downwind from the line. Measured values decreased more quickly than calculated ones farther downwind from the line. Considering the effect of point discharge from ground cover (earth corona) improved the agreement in the farther downwind region.

Suda, Tomotaka; Sunaga, Yoshitaka [Central Research Institute of Electrical Power Industry, Komae, Tokyo (Japan)] [Central Research Institute of Electrical Power Industry, Komae, Tokyo (Japan)

1995-10-01T23:59:59.000Z

434

Identification of ions near HVDC (high-voltage direct-current) transmission lines: Final report  

SciTech Connect (OSTI)

Positive and negative ion species were identified and studied at two separate field sites and one laboratory site. The first field study was conducted under an operating HVDC transmission line. The second was near a HVDC test line and measurements were performed with the line in both an energized and de-energized state. During clear, sunny days HSO/sub 4//sup /minus///center dot/H/sub 2/SO/sub 4/ was observed to be the dominant negative ion in the natural ion spectrum. At night, however, HSO/sub 4//sup /minus// core ions virtually disappeared, and were replaced by NO/sub 3//sup /minus// core ions and their first nitric acid cluster. Both negative spectra also typically contained lesser concentrations of the malonate ion. The transmission line negative spectra were similar but were typically dominated by the NO/sub 3//sup /minus// core ions during both day and night. The positive ions observed under HVDC lines were typically either NH/sub 4//sup +/ or C/sub 5/H/sub 6/N/sup +/, which reacted with higher proton affinity species (such as methylpyridines, trimethylamine and quinoline) farther from or in the absence of the transmission line. The observed differences between natural and anthropogenic ion spectra near HVDC lines are attributed primarily to a shortening of ion lifetimes by the strong electric field associated with the HVDC lines. One exception is the production of potassium and probably sodium based ions from the decomposition of insects in transmission line coronas. 22 refs., 29 figs.

Eisele, F.L.

1989-05-01T23:59:59.000Z

435

Modulated waves and pattern formation in coupled discrete nonlinear LC transmission lines  

Science Journals Connector (OSTI)

The conditions for the propagation of modulated waves on a system of two coupled discrete nonlinear LC transmission lines with negative nonlinear resistance are examined, each line of the network containing a finite number of cells. Our theoretical analysis shows that the telegrapher equations of the electrical transmission line can be reduced to a set of two coupled discrete complex Ginzburg-Landau equations. Using the standard linear stability analysis, we derive the expression for the growth rate of instability as a function of the wave numbers and system parameters, then obtain regions of modulational instability. Using numerical simulations, we examine the long-time dynamics of modulated waves in the line. This leads to the generation of nonlinear modulated waves which have the shape of a soliton for the fast and low modes. The effects of dissipative elements on the propagation are also shown. The analytical results are corroborated by numerical simulations.

Fabien II Ndzana; Alidou Mohamadou; Timoléon C. Kofané; Lars Q. English

2008-07-29T23:59:59.000Z

436

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

SciTech Connect (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

437

Availabilty of corona cage for predicting radio interference generated from HVDC transmission line  

SciTech Connect (OSTI)

This paper describes a prospect that a corona cage is available for predicting radio interference (RI) generated from HVDC transmission lines. This is based on the assumption that the generation quantity of RI is determined by Fmax (the true maximum conductor surface gradient in the presence of space charge), regardless of surrounding electrode arrangement. This assumption has been verified by tests using corona cages and a test line.

Nakano, Y.; Sunaga, Y. (Central Research Inst. of Electric Power Industry, Tokyo (Japan))

1990-07-01T23:59:59.000Z

438

Availability of corona cage for predicting audible noise generated from HVDC transmission line  

SciTech Connect (OSTI)

This paper describes a prospect that a corona cage is available for predicting audible noise (AN) generated from HVDC transmission line. This is based on the assumption that generation quantities of AN and corona current are determined by Fmax (the true maximum conductor surface gradient in the presence of space charge) regardless of the surrounding electrode arrangement. This assumption has been verified by tests using corona cages and a test line.

Nakano, Y.; Sunaga, Y.

1989-04-01T23:59:59.000Z

439

Three-dimensional isotropic perfect lens based on LC-loaded transmission lines  

E-Print Network [OSTI]

An isotropic three-dimentional perfect lens based on cubic meshes of interconnected transmission lines and bulk loads is proposed. The lens is formed by a slab of a loaded mesh placed in between two similar unloaded meshes. The dispersion equations and the characteristic impedances of the eigenwaves in the meshes are derived analytically, with an emphasis on generality. This allows designing of transmission-line meshes with desired dispersion properties. The required backward-wave mode of operation in the lens is realized with simple inductive and capacitive loads. An analytical expression for the transmission through the lens is derived and the amplification of evanescent waves is demonstrated. Factors that influence enhancement of evanescent waves in the lens are studied and the corresponding design criteria are established. A possible realization of the structure is outlined.

P. Alitalo; S. Maslovski; S. Tretyakov

2005-09-16T23:59:59.000Z

440

The Reliability Investigation on ACSR Splice Connector Systems Used in Overhead Power transmission Lines  

SciTech Connect (OSTI)

Due to material discontinuity and inherited forming mechanism from a crimped-type splice connector, the associated conductor-connector system is highly sensitive to system components aging, especially during high-temperature operations. Furthermore, due to the increase in power demand and limited investment in new infrastructure, existing overhead power transmission lines often need to operate at temperatures higher than the original designed values. This has led to the accelerated aging and degradation of conductor-connector systems. The implications of connector aging are two-fold: (1) significant increase in resistivity of the splice connector and (2) significant reduction in the connector clamping strength. Therefore, splice connectors are one of the weakest links in the electric power transmission infrastructure. In this paper we will discuss the reliability of splice connector systems, including both single stage and two stage splice connectors, used in ACSR conductor of transmission lines under high temperature operations.

Wang, Jy-An John [ORNL] [ORNL; Jiang, Hao [ORNL] [ORNL; Ren, Fei [ORNL] [ORNL

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Entanglement of nitrogen-vacancy-center ensembles using transmission line resonators and a superconducting phase qubit  

SciTech Connect (OSTI)

We propose a potentially practical scheme for creating entanglement between two distant nitrogen-vacancy-center (N-V) spin ensembles using a current-biased Josephson junction superconducting qubit and transmission line resonators. The idea provides a scalable way to an N-V ensemble-based quantum network, which is close to the reach with currently available technology.

Yang, W. L.; Feng, M. [State Key Laboratory of Magnetic Resonance and Atomic and Molecular Physics, Wuhan Institute of Physics and Mathematics, Chinese Academy of Sciences, and Wuhan National Laboratory for Optoelectronics, Wuhan 430071 (China); Hu, Y. [Department of Physics, Huazhong University of Science and Technology, Wuhan 430074 (China); Yin, Z. Q. [Key Laboratory of Quantum Information, University of Science and Technology of China, Chinese Academy of Sciences, Hefei 230026 (China); Deng, Z. J. [Department of Physics, National University of Defense Technology, Changsha 410073 (China)

2011-02-15T23:59:59.000Z

442

A MODIFIED TRANSMISSION LINE MODEL FOR LIGHTNING RETURN STROKE FIELD CALCULATIONS  

E-Print Network [OSTI]

- 229 - 44Hl A MODIFIED TRANSMISSION LINE MODEL FOR LIGHTNING RETURN STROKE FIELD CALCULATIONS V. The modifications considered differ from each other by the height dependent attenuation factor for the return stroke data available. Some problems with modeling of the early and late stages of the return stroke process

Florida, University of

443

A new time-frequency approach for hybrid differential and impedance protection of transmission lines  

Science Journals Connector (OSTI)

A new current differential protection of transmission lines is presented in this paper using an S-transform variant having very fast computational speed suitable for real-time applications. The conventional S-transform used earlier for transmission line protection has large computational overhead and thus is not suitable for generating decisions regarding the occurrence of a fault and its type on a transmission line. The new S-transform variant is based on different types of frequency scaling, band pass filtering, and interpolation techniques to achieve a significant reduction of computation time in comparison to the original S-transform. For wide area protection as in the case of smart grid the current differential protection is realised by extracting the relevant features from the current signals at both the sending end and receiving end terminals from the new S-transform generated contours. This paper focuses on the fault detection, classification, and location aspects using a new S-transform variant applied to synchronised measurement of the differential and average energy of current signals. Digital simulation results using EMTP for a long distance transmission line show the computational speed and efficiency of this new algorithm.

S.K. Swain; P.K. Dash

2014-01-01T23:59:59.000Z

444

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

445

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

446

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

447

EIS-0103: New England/Hydro-Quebec 450-kV Direct Current Transmission Line Interconnection  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration prepared this statement to evaluate the environmental impacts of the construction, maintenance and operation of a 57-mile transmission line from Monroe, New Hampshire, to the U.S./Canadian border for the purpose of economic exchange of power and increased reliability.

448

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana  

Broader source: Energy.gov [DOE]

DOE’s Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental impacts of a proposal to rebuild approximately 120 miles of existing transmission line in Sanders, Lake, Missoula, Granite, Powell, and Deer Lodge Counties in Montana.

449

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register  

Broader source: Energy.gov [DOE]

The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

450

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-141- SalemAlbany #2)  

Broader source: Energy.gov (indexed) [DOE]

1- SalemAlbany #2) 1- SalemAlbany #2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Salem Albany #2 115 kV transmission line from Salem Substation to Albany Substation. Location: The project is located in the BPA Eugene Region, within Marion, Polk, and Benton Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission

451

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-140- SalemAlbany1)  

Broader source: Energy.gov (indexed) [DOE]

0- SalemAlbany1) 0- SalemAlbany1) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Salem Albany #1 115 kV transmission line from Salem Substation to Albany Substation. Location: The project is located in the BPA Eugene Region, Marion, Linn, and Benton County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission

452

A complete and normalized 61850 substation (Smart Grid Project) | Open  

Open Energy Info (EERE)

complete and normalized 61850 substation (Smart Grid Project) complete and normalized 61850 substation (Smart Grid Project) Jump to: navigation, search Project Name A complete and normalized 61850 substation Country Spain Headquarters Location Madrid, Spain Coordinates 40.488735°, -3.284912° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.488735,"lon":-3.284912,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

453

Microcomputer Applications in Power System Substation Automation  

Science Journals Connector (OSTI)

The object of this chapter is to describe power system applications of microcomputers, particularly in the area of power substation automation.The major functions required in substation automation are reviewed an...

C. T. Nguyen; R. Grondin; A. St-Jacques…

1983-01-01T23:59:59.000Z

454

EIS-0496: San Luis Transmission Project, Alameda, Merced, San Joaquin and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

96: San Luis Transmission Project, Alameda, Merced, San 96: San Luis Transmission Project, Alameda, Merced, San Joaquin and Stanislaus Counties, California EIS-0496: San Luis Transmission Project, Alameda, Merced, San Joaquin and Stanislaus Counties, California Summary DOE's Western Area Power Administration, with the Bureau of Reclamation as a cooperating agency, is preparing a joint EIS and environmental impact report (under the California Environmental Quality Act) to evaluate the potential environmental impacts of the proposed interconnection of certain San Luis Unit facilities to Western's Central Valley Project Transmission System. Western proposes at a minimum to construct, own, operate, and maintain a new 230-kilovolt (kV) transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a

455

DOE/EIS-0285-SA-137: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Chemawa-Salem 1&2 (4/1/03)  

Broader source: Energy.gov (indexed) [DOE]

7- Chemawa-Salem1&2) 7- Chemawa-Salem1&2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Chemawa-Salem #1 115 kV and #2 230 kV transmission lines from Chemawa Substation to Salem Substation. Location: The project is located in the BPA Eugene Region, Marion County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-

456

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2  

Broader source: Energy.gov (indexed) [DOE]

2- KeelerOregon City #2) 2- KeelerOregon City #2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Keeler-Oregon City #2 115 kV transmission line from Keeler Substation to Oregon City Substation. Includes 5 miles of the St. Johns- Oregon City #2 69 kV transmission line. Location: The project is located in the BPA Eugene Region, Washington County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation via hand cutting along the right-of-way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with

457

Seismic fragility analysis of equipment and structures in a Memphis Electric substation. Technical report  

SciTech Connect (OSTI)

This report presents a seismic fragility analysis of equipment and structures in an electric substation in Memphis, Tennessee. These include the pothead structure, 115 kv switch structure, 97 kv lightning arresters, control house, capacitor banks, 115/12 kv transformers, 12 kv regulators, 115 kv oil circuit breakers, and 12 kv oil circuit breakers. The results from this fragility analysis provide the expected performance of equipment and structures in a substation. They can also be used to evaluate the seismic performance of the entire electric substation and to perform a system reliability analysis of the electric transmission system.

Huo, J.R.; Hwang, H.H.M.

1995-08-10T23:59:59.000Z

458

McMinnville Area Support Transmission Project : Environmental Assessment.  

SciTech Connect (OSTI)

This document discusses a project to provide continuing reliable electrical service to the McMinnville, Oregon, area. BPA proposes to participate with the City of McMinnville Water and Light Department in constructing a new 230-kilovolt transmission line and substation. BPA has prepared an environmental assessment evaluating the proposed project. Reasons that constructing the line and substation would not cause significant environmental impact include: consistency with local land use plans, consistency of appearance with existing transmission and manufacturing facilities in the area, only slight effect on farmland, and avoidance of wetlands and other environmentally sensitive areas. A finding is included that there is no practicable alternative to locating the project within a 100-year floodplain. 1 fig.

United States. Bonneville Power Administration.

1990-01-01T23:59:59.000Z

459

Getting the Crop to Market: Siting and Permitting Transmission Lines on Buffalo Ridge, Minnesota  

Science Journals Connector (OSTI)

Publisher Summary The rapid development of wind technology in southwest Minnesota has prompted the need to improve the transmission system in this area. The Minnesota Public Utilities Commission approved four major transmission line projects in 2003 to meet this need, including an 87-mile 345 kV transmission line. Northern States Power Company, d/b/a Xcel Energy, currently is involved in the State siting process with the projects and has been gathering public and agency input. Gathering the information early in the process has proven to be invaluable in deciding route locations and permitting strategies. In addition, public reception for the projects has been primarily positive since these facilities will allow additional wind generation to be developed in the area. This chapter describes the Xcel Energy projects, public reactions to the project, and the routing and siting issues, including some unique to these projects. Xcel Energy will highlight the primary lessons learned that can be used in future projects for routing transmission lines.

Michelle F. Bissonnette; Angela G.L. Piner; Pamela J. Rasmussen

2008-01-01T23:59:59.000Z

460

Integrating modified Delphi method with fuzzy AHP for optimal power substation location selection  

Science Journals Connector (OSTI)

Evaluation and selection of power substation location is an important strategic decision making problem for both public and private sector. The multi-dimensional, multi-criteria nature of the power substation location problem limits the usefulness of any particular single objective model. Studies have shown that electromagnetic radiations emanating from the high voltage lines and substations, pose serious adverse health consequences to living beings. In this study, social, technological, economical, environmental and site characteristics factors and sub criteria, have been derived to make the optimal power substation location selection decision more realistic and effectual. In this paper, an improved and more appropriate power substation location evaluation and selection model has been developed by integrating Modified Delphi method with Fuzzy Analytic Hierarchy Process (FAHP). A numerical example is presented to show applicability and performance of the proposed methodology followed by a sensitivity analysis to discuss and explain the results.

Golam Kabir; M. Ahsan Akhtar Hasin

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Power substation location selection using fuzzy analytic hierarchy process and PROMETHEE: A case study from Bangladesh  

Science Journals Connector (OSTI)

Abstract Electromagnetic radiations emanating from the high voltage lines and substations pose serious adverse health consequences to living beings. As a result, selection of power substation location is an important strategic decision-making problem for both public and private sectors. In general, many conflicting factors affect the appropriate substation location selection problem which adheres to uncertain and imprecise data. In this paper, a simple, systematic and logical scientific approach is structured to evaluate power substation location through integrating Fuzzy Analytical Hierarchy Process (FAHP) with the Preference Ranking Organization Method for Enrichment Evaluations (PROMETHEE). The proposed integrated approach provides more realistic and reliable results, and facilitates the decision-maker to handle multiple contradictory decision perspectives through eliminating the limitations of FAHP and PROMETHEE methods. To accredit the proposed model, it is implemented in a power substation location selection problem in Bangladesh.

Golam Kabir; Razia Sultana Sumi

2014-01-01T23:59:59.000Z

462

Breaking the ice: de-icing power transmission lines with high-frequency, high-voltage excitation  

E-Print Network [OSTI]

Breaking the ice: de-icing power transmission lines with high-frequency, high-voltage excitation of this work in other works must be obtained from the IEEE. #12;CING OF POWER TRANSMISSION lines during winter that applies 33-kV, 100-kHz power. TheoverallsystemisillustratedinFigure1.Itcouldbede- ployed in two different

463

MOV surge arresters: improved substation equipment protection  

SciTech Connect (OSTI)

The introduction of metal-oxide-varistor (MOV) surge arresters has added a new dimension to substation equipment protection. Through the optimal use of these arresters, it is possible to lower surge arrester ratings and thereby improve protective margins, resulting in a possible reduction of the insulation levels (BIL) of substation equipment. This reduction in BIL can lead to a significant reduction in the cost of substation equipment. General methods are delineated for selecting MOV surge arresters for substation protection and the resulting effect on substation equipment insulation levels.

Niebuhr, W.D.

1985-07-01T23:59:59.000Z

464

BE 400/18 kV Substation Renovation Project  

E-Print Network [OSTI]

The 400/18 kV SPS main substation was designed for the 400 GeV SPS project and was commissioned in 1974. It has been upgraded several times to form the present 400/66/18 kV SPS and LEP transmission power comprising 490 MVA and 240 MVAR installed power. The beginning of the LHC project and the obsolescence of the main elements, and consequently limited reliability, made it necessary to begin a complete renovation program. The new configuration of the substation will integrate the new compensator of reactive power efficiently into the 18 kV pulsed network. In this way the new compensator will facilitate the functioning of the pulsed network with the new loads and it will improve the performance of the electrical substation. The renovation program consists in a global reorganisation of the substation, with the total replacement of the 18 kV power equipment, a set up of new control and protection systems for the 18 kV and 400 kV section and the reconditioning of all the 400 kV equipment.

Vairo, Antonio

2001-01-01T23:59:59.000Z

465

EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer,  

Broader source: Energy.gov (indexed) [DOE]

8: Antelope Valley Station to Neset Transmission Project, 8: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND SUMMARY USDA Rural Utilities Service is preparing this EIS to evaluate the environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE's Western Area Power Administration (WAPA), a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to Western's transmission system. PUBLIC COMMENT OPPORTUNITIES No Public Comment Opportunities at this time

466

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENT, FISH AND WILDLIFE August 30, 2002 In reply refer to: T To: People Interested in the McNary-John Day Transmission Line Project Bonneville Power Administration (Bonneville) has finalized the enclosed Environmental Impact Statement (EIS) for the McNary-John Day Transmission Line Project. In March, we sent you the draft EIS, asked for your comments and had three public meetings. The response was great; we received about 350 comments on the draft document. Thank you for taking the time to read the document and tell us your ideas. This letter briefly describes the final EIS, outlines our next steps and tells where to call if you have questions. The final EIS is abbreviated, consisting of an introduction to the document, changes to the draft

467

Wallula-McNary Transmission Line Project and Wallula Power Project EIS (DOE/EIS-0030)  

Broader source: Energy.gov (indexed) [DOE]

RECORD OF DECISION for the Wallula-McNary Transmission Line Project and Wallula Power Project THE DECISION The Bonneville Power Administration (BPA) has decided to implement its portion of the proposed action identified in the Wallula Power Project and Wallula-McNary Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0330, August 2002). The proposed action includes construction of the Wallula Power Project (Wallula Project) that has been proposed by Wallula Generation, LLC (Wallula LLC). The proposed Wallula Project is a 1,300- megawatt (MW) natural-gas-fired, combined-cycle turbine power plant that Wallula LLC is planning to construct on a site near the Columbia River in Walla Walla County, Washington, approximately eight miles south of the City of Pasco. BPA's portion of the proposed action

468

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

and and Wallula - McNary Transmission Line Project Final Environmental Impact Statement DOE/EIS-0330 Lead Agencies Bonneville Power Administration Washington State Energy Facility Site Evaluation Council Cooperating Agencies Bureau of Land Management U.S. Fish and Wildlife Service August 2002 EFSEC Washington State Energy Facility Site Evaluation Council August 2002 Dear Reader: Enclosed for your reference is the abbreviated form Final Environmental Impact Statement (FEIS) for the proposed Wallula Power Project and Wallula-McNary Transmission Line Project. This document is designed to supplement or correct information provided in the Draft Environmental Impact Statement (DEIS). The proponent, Wallula Generation, LLC, has requested to build a 1,300-megawatt, gas-fired

469

DOE/EA-1602: Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (November 2008)  

Broader source: Energy.gov (indexed) [DOE]

Alternative Intake Project Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment November 2008 DOE/EA-1602 DOE/EA-1602 Final Environmental Assessment for the Western Area Power Administration Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water quality strategy to protect and improve water quality for its customers, the Contra Costa Water District (CCWD) is implementing the Alternative Intake Project (AIP). The AIP will enable CCWD to relocate some of its existing diversions to Victoria Canal, a Delta location with higher-quality source water than is currently available at its Old River and Rock Slough intakes. The AIP project purpose is to protect and improve the quality of water delivered to CCWD's untreated-

470

Schultz-Hanford Area Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense January 2003 Final Environmental Impact Statement Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA), Richland Operations Office (RL); U.S. Department of Defense, Department of Army (USDOA); U.S. Department of Interior, Bureau of Land Management (BLM), Bureau of Reclamation (BOR), Fish and Wildlife Service (USFWS). Title of Proposed Project: Schultz-Hanford Area Transmission Line Project - DOE/EIS-0325 State Involved: Washington Abstract: BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project

471

AC and lightning performance of fiberglass crossarms aged in 115 kV transmission line  

SciTech Connect (OSTI)

This paper presents the results of an investigation of the electrical performance of 115 kV transmission line fiberglass cross-arm used by Mississippi Power and Light Company. A transmission line fiberglass crossarm removed from service and companion cross-arms outdoors but not in service were examined. The evaluation of electrical performance was based on flashover voltage value at AC voltage and standard lightning impulses as well as under dry and wet conditions. The tests were performed in the Mississippi State University High Voltage Laboratory. The obtained flashover voltages show no large differences in electrical strength of fiberglass crossarms removed from service and those stored outdoors. The Added CFO voltage by fiberglass crossarm to the porcelain suspension insulators is presented versus the length of the fiberglass crossarm for dry and wet conditions.

Grzybowski, S. (Mississippi State Univ., Mississippi State, MS (United States). Dept. of Electrical and Computer Engineering); Jenkins, E.B. (Entergy, New Orleans, LA (United States). Generation and Transmission Group)

1993-10-01T23:59:59.000Z

472

Hybrid particle traps and conditioning procedure for gas insulated transmission lines  

DOE Patents [OSTI]

A gas insulated transmission line includes an outer sheath, an inner condor within the outer sheath, insulating supports supporting the inner conductor within the outer sheath, and an insulating gas electrically insulating the inner conductor from the outer sheath. An apertured particle trapping ring is disposed within the outer sheath, and the trapping ring has a pair of dielectric members secured at each longitudinal end thereof, with the dielectric members extending outwardly from the trapping ring along an arc. A support sheet having an adhesive coating thereon is secured to the trapping ring and disposed on the outer sheath within the low field region formed between the trapping ring and the outer sheath. A conditioning method used to condition the transmission line prior to activation in service comprises applying an AC voltage to the inner conductor in a plurality of voltage-time steps, with the voltage-time steps increasing in voltage magnitude while decreasing in time duration.

Dale, Steinar J. (Monroeville, PA); Cookson, Alan H. (Churchill, PA)

1982-01-01T23:59:59.000Z

473

Modelling Quantum Mechanics by the Quantumlike Description of the Electric Signal Propagation in Transmission Lines  

E-Print Network [OSTI]

It is shown that the transmission line technology can be suitably used for simulating quantum mechanics. Using manageable and at the same time non-expensive technology, several quantum mechanical problems can be simulated for significant tutorial purposes. The electric signal envelope propagation through the line is governed by a Schrodinger-like equation for a complex function, representing the low-frequency component of the signal, In this preliminary analysis, we consider two classical examples, i.e. the Frank-Condon principle and the Ramsauer effect.

R. Fedele; M. A. Man'ko; V. I. Man'ko; V. G. Vaccaro

2002-07-30T23:59:59.000Z

474

Event-based Transmission Line Matrix Method for Simulating Site-Specific Multipath Propagation Characteristics  

SciTech Connect (OSTI)

Accurate radio channel modeling is essential for deploying advanced wireless sensors in harsh industrial and urban environments. Site-specific propagation modeling tools are required to understand the channel parameters with in these environments. Multipath delay spread determines the frequency-selective fading characteristics of the channel. This paper describes a novel computationally inexpensive technique to determine multipath delay spread. Event-based transmission line matrix-based method is used to simulate the channel.

Kuruganti, Phani Teja [ORNL] [ORNL; Nutaro, James J [ORNL] [ORNL; Djouadi, Seddik M [ORNL] [ORNL

2012-01-01T23:59:59.000Z

475

EIS-0301: NRG Energy Services, Inc., Arizona-Baja California 500 kV Transmission Line  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's decision to approve NRG Energy, Inc. (NRG) for a Presidential permit to construct a 500,000-volt transmission line originating at the switchyard of the Palo Verde Nuclear Generating Station near Phoenix, Arizona, and extending approximately 177 miles to the southwest, where it would cross the United States (U.S.) border with Mexico in the vicinity of Calexico, California.

476

EA-1551: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line  

Broader source: Energy.gov [DOE]

DOE started to prepare, jointly with the Montana Department of Environmental Quality (MDEQ), an EA that would also serve as a state EIS. The document would evaluate the potential environmental impacts of a proposed international transmission line that would cross the U.S.-Canada border in northwest Montana. Based on comments received on the DOE Draft EA/MDEQ Draft EIS, DOE cancelled preparation of the EA and announced preparation of DOE/EIS-0399 (of the same title).

477

Compact Reflection-Type Phaser Using Quarter-Wavelength Transmission Line Resonators  

E-Print Network [OSTI]

A compact reflection-type phaser composed of quarter-wavelength transmission line resonators interconnected by alternating K- and J-inverters is proposed. A design method is also presented. To validate this method, a 4th-order example is designed and fabricated. The proposed phaser is shown to exhibit the benefits of smaller size, easier fabrication and suppressed even-order harmonics compared with previously reported half-wavelength phasers.

Liao, Weiwei; Chen, Yifan; Caloz, Christophe

2014-01-01T23:59:59.000Z

478

Probing semiconductor quantum dot state and manipulation with superconducting transmission line resonator  

E-Print Network [OSTI]

A coupled system of a superconducting transmission line resonator with a semiconductor double quantum dot is analyzed. We simulate the phase shift of the microwave signal in the resonator, which is sensitive to the quantum dot qubit state and manipulation. The measurement quality is sufficiently high and the results demonstrate a solid-state quantum processor based on this type of circuit can be envisioned.

Zhe Guan

2013-12-08T23:59:59.000Z

479

Particle trap with dielectric barrier for use in gas insulated transmission lines  

DOE Patents [OSTI]

A gas-insulated transmission line includes an outer sheath, an inner conductor within the outer sheath, insulating supports supporting the inner conductor within the outer sheath, and an insulating gas electrically insulating the inner conductor from the outer sheath. An apertured particle trapping electrode is disposed within the outer sheath, and the electrode has a pair of dielectric members secured at each longitudinal end thereof, with the dielectric members extending outwardly from the apertured electrode.

Dale, Steinar J. (Monroeville, PA)

1982-01-01T23:59:59.000Z

480

Termination for a superconducting power transmission line including a horizontal cryogenic bushing  

DOE Patents [OSTI]

A termination for a superconducting power transmission line is disclosed which is comprised of a standard air entrance insulated vertical bushing with an elbow, a horizontal cryogenic bushing linking the pressurized cryogenic cable environment to the ambient temperature bushing and a stress cone which terminates the cable outer shield and transforms the large radial voltage gradient in the cable dielectric into a much lower radial voltage gradient in the high density helium coolant at the cold end of the cryogenic bushing.

Minati, Kurt F. (Northport, NY); Morgan, Gerry H. (Patchogue, NY); McNerney, Andrew J. (Shoreham, NY); Schauer, Felix (Upton, NY)

1984-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission lines substations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

EA-1972: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona  

Broader source: Energy.gov [DOE]

Draft EA: Comment Period Ends 12/23/2014Western Area Power Administration issued a Draft EA that assesses the potential environmental impacts of the proposed rebuild of a 35.6-mile transmission line that Western operates and maintains under an agreement with the Central Arizona Project. Additional information is available on the project website, http://www.wapa.gov/dsw/environment/ED2DOEEA1972.htm.

482

A B C D E F G H I J K RETI PHASE 2A TRANSMISSION LINE SEGMENT ANALYSIS  

E-Print Network [OSTI]

37 38 39 A B C D E F G H I J K RETI PHASE 2A TRANSMISSION LINE SEGMENT ANALYSIS MDPT_DESC_1 DESC D E F G H I J K RETI PHASE 2A TRANSMISSION LINE SEGMENT ANALYSIS IRMT_SCEJ_2 SCEJ_CAMI_1 SCEJ_PISG_1 Monument X Other Relevant Information (e.g., line size) ROW/Corridor Information 1 ROW no change X X X X 2

483

Using Dielectric Losses to De-Ice Power Transmission Lines with 100 kHz High-Voltage  

E-Print Network [OSTI]

capable of exciting a 1 m test line to 30 kV has been tested and show to be capable of removing a 7 mm iceUsing Dielectric Losses to De-Ice Power Transmission Lines with 100 kHz High-Voltage Excitation J DIELECTRIC LOSSES TO DE-ICE POWER TRANSMISSION LINES . . . 1 Using Dielectric Losses to De-Ice Power

484

Application of Goubau Surface Wave Transmission Line for Improved Bench Testing of Diagnostic Beamline Elements  

SciTech Connect (OSTI)

In-air test fixtures for beamline elements typically utilize an X-Y positioning stage, and a wire antenna excited by an RF source. In most cases, the antenna contains a standing wave, and is useful only for coarse alignment measurements in CW mode. A surface-wave (SW) based transmission line permits RF energy to be launched on the wire, travel through the beamline component, and then be absorbed in a load. Since SW transmission lines employ travelling waves, the RF energy can be made to resemble the electron beam, limited only by ohmic losses and dispersion. Although lossy coaxial systems are also a consideration, the diameter of the coax introduces large uncertainties in centroid location. A SW wire is easily constructed out of 200 micron magnet wire, which more accurately approximates the physical profile of the electron beam. Benefits of this test fixture include accurate field mapping, absolute calibration for given beam currents, Z-axis independence, and temporal response measurements of sub-nanosecond pulse structures. Descriptions of the surface wave launching technique, transmission line, and instrumentation are presented, along with measurement data.

John Musson, Keith Cole, Sheldon Rubin

2009-05-01T23:59:59.000Z

485

Delayed Feedback and Chaos on the Driven Diode-Terminated Transmission Line  

E-Print Network [OSTI]

A simple model of a distributed, non-linear circuit that produces chaos at GHz frequencies is introduced and tested experimentally. The model circuit is a driven diode-terminated transmission line with the transmission line impedance mismatched to that of the source. Experiments were performed with sinusoidal driving frequencies of 10 MHz to 1.2 GHz, driving powers of -30 to +50 dBm and transmission line delay times from 3 to 20 ns. Diode reverse recovery times ranged from 4 to 100 ns. As a result of many experiments, it was found that chaotic behavior was strongly dependent on the unbiased, small-signal reactance of the system as seen by the driving source, and influenced by an applied DC voltage-bias across the diode. In the experiments that showed period-doubling and / or chaos, the reverse recovery times of the diodes were on the order of both the driving period and the delay time of the circuits. Comparisons between theory and experiment are in general agreement. Chaos produced with a driving frequency of 1.105 GHz has been observed experimentally.

Vassili Demergis; Alexander Glasser; Marshal Miller; Thomas M. Antonsen Jr.; Edward Ott; Steven M. Anlage

2006-05-18T23:59:59.000Z

486

Experimental observation of delay-induced radio frequency chaos in a transmission line oscillator  

Science Journals Connector (OSTI)

We report an experimental study of fast chaotic dynamics in a delay dynamical system. The system is an electronic device consisting of a length of coaxial cable terminated on one end with a diode and on the other with a negative resistor. When the negative resistance is large the system evolves to a steady state. As the negative resistance is decreased a Hopf bifurcation occurs. By varying the length of the transmission line we observe Hopf frequencies from 7–53? MHz . With the transmission line length fixed we observe a period doubling route to chaos as the negative resistance is further reduced providing the first experimental confirmation of an existing theoretical model for nonlinear dynamics in transmission line oscillators [Corti et al. IEEE Trans. Circ. Syst. I: Fundam. Theory Appl. 41 730 (1994)]. However other experimental results indicate limitations to this model including an inability to predict the Hopf frequency or to produce realistic continuous wave forms. We extend the model to include finite bandwidth effects present in a real negative resistor. The resulting model is a neutral delay differential equation that provides better agreement with experimental results.

Jonathan N. Blakely; Ned J. Corron

2004-01-01T23:59:59.000Z

487

BPA, Transmission, I-5 Corridor Reinforcement, scoping meeting...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

line from a new substation near Castle Rock WA to a near Castle Rock, WA to a new substation near Troutdale, OR. BPA is proposing route segments that will be refined into...

488

Electromagnetic interference from transmission lines located in central region of Saudi Arabia  

SciTech Connect (OSTI)

This paper discusses the electromagnetic interference (EMI) generated by transmission lines operating in the Central Region of Saudi Arabia. These lines have operating voltages of 132, 230 and 380 kV and are located in a hot, dry arid desert land where precipitaton is very low. Measurements of typical EMI characteristics such as frequency spectrum, lateral profile and statistical variation are performed for each type of line and results are analyzed. It is found that general noise characteristic of these lines are similar to those reported in the literature for other lines which are located in relatively wet environment. The results further show that if operating gradients are low, the increase of EMI due to rain is lower than 20 dB value usually observed. The presence of sand and dust storms does not increase EMI level in any appreciable manner. The fair weather EMI level of these lines can be predicted with reasonable accuracy by using the CIGRE formula. Results are also presented for power line carrier related EMI.

Al-Arainy, A.A.; Malik, N.H.; Abdul-Aal, L.N.

1988-01-01T23:59:59.000Z

489

Electromagnetic interference from transmission lines located in central region of Saudi Arabia  

SciTech Connect (OSTI)

This paper discusses the electromagnetic interference (EMI) generated by transmission lines operating in the Central Region of Saudi Arabia. These lines have operating voltages of 132, 230 and 380 kV and are located in a hot, dry arid desert land where precipitation is very low. Measurements of typical EMI characteristics such as frequency spectrum, lateral profile and statistical variation are performed for each type of line and results are analyzed. It is found that general noise characteristic of these lines are similar to those reported in the literature for other lines which are located in relatively wet environment. The results further show that if operating gradients are low, the increase of EMI due to rain is lower than 20 dB value usually observed. The presence of sand and dust storms does not increase EMI level in any appreciable manner. The fair weather EMI level of these lines can be predicted with reasonable accuracy by using the CIGRE formula. Results are also presented for power line carrier related EMI.

Al-Arainy, A.A.; Malik, N.H.; Abdul-Aal, L.N.

1989-01-01T23:59:59.000Z

490

Transient electromagnetic interference in substations  

SciTech Connect (OSTI)

Electromagnetic interference levels on sensitive electronic equipment are quantified experimentally and theoretically in air and gas insulated substations of different voltages. Measurement techniques for recording interference voltages and currents and electric and magnetic fields are reviewed and actual interference data are summarized. Conducted and radiated interference coupling mechanisms and levels in substation control wiring are described using both measurement results and electromagnetic models validated against measurements. The nominal maximum field and control wire interference levels expected in the switchyard and inside the control house from switching operations, faults, and an average lightning strike are estimated using high frequency transient coupling models. Comparisons with standards are made and recommendations given concerning equipment shielding and surge protection.

Wiggins, C.M.; Thomas, D.E.; Nickel, F.S.; Salas, T.M. (BDM International, Inc., Albuquerque, NM (United States)); Wright, S.E. (Electric Power Research Inst., Palo Alto, CA (United States))

1994-10-01T23:59:59.000Z

491

Energia Sierra Juarez U.S. Transmission Line Final EIS Volume 3a, part 1 of 3  

Broader source: Energy.gov (indexed) [DOE]

Energia Sierra Juarez U.S. Transmission Line Project Energia Sierra Juarez U.S. Transmission Line Project Final Environmental Impact Statement Volume 3 - Comments and Responses Document May 2012 U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Washington, DC 20585 Cooperating Agency - County of San Diego San Diego, CA DOE/EIS-0414 Energia Sierra Juarez U.S. Transmission Line Final EIS i May2012 Table of Contents VOLUME 1 FINAL ENVIRONMENTAL IMPACT STATEMENT Distribution Letter Cover Sheet Summary ................................................................................................................................................... S-1 S.1 Background and Overview ............................................................................................... S-1

492

Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Assessment Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA -1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA-1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Table of Contents CH-MM & AU-CH Transmission Line Rebuild Table of Contents i Table of Contents Summary ......................................................................................................................................... 1 1.0 Introduction ..................................................................................................................

493

Effect of Pressure Transmission Lines on the Frequency Response of Pressure Transducers  

SciTech Connect (OSTI)

It is well known that the length and diameter of the transmission lines between a pressure transducer and the pressure source can significantly affect the dynamic frequency response of the transducer. A new lumped parameter model has been developed to predict the time and frequency response of any number of different transducers connected in parallel in a manifold. While the model is simple to apply, it can provide quantitative information given the transducer and transmission line characteristic parameters. More importantly, the model can be used to evaluate the measured, in-situ response. this provides the natural frequency and the effective damping which can then be used to generate a frequency response curve. The model is also useful for designing a new pressure transmission system, which will have the required frequency response. The model was qualified by comparison to measurements of the step-function pressure response of a number of different transducers and test installations. With the aid of the model, the system resonant frequency and damping can be determined. Additional damping can be added if necessary to prevent ringing of the signal and to assure an accurate pressure measurement with a flat frequency response. For all of the experimental systems evaluated in this work, the response at the natural frequency was significantly underdamped and ringing was observed. This means that to perform accurate measurements damping needs to be added to the system. It was observed that the use of flexible pressure lines versus hard lines does increase the damping and may therefore be useful in certain situations. Equations were developed to permit sizing an orifice to be added to the system to provide the necessary damping.

G.J. Kirouac

2000-11-13T23:59:59.000Z

494

Amended Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line: Federal Register Notice, Volume 79, No. 222- Nov. 18, 2014  

Broader source: Energy.gov [DOE]

Minnesota Power, Great Northern Transmission Line has submitted an amended application for a Presidential Permit to construct, operate, maintain and connect an electric transmission line across the United States border with Canada.

495

BPA, Transmission, I-5 Corridor Reinforcement Project, presentation...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Project 500-kilovolt transmission New substations at - Castle Rock, Wash. - Troutdale, Ore. 70 miles apart Many route segments 17 Factors we consider Electrical needs for...

496

Living and Working Safely Around High-Voltage Power Lines.  

SciTech Connect (OSTI)

High-voltage transmission lines can be just as safe as the electrical wiring in the homes--or just as dangerous. The crucial factor is ourselves: they must learn to behave safely around them. This booklet is a basic safety guide for those who live and work around power lines. It deals primarily with nuisance shocks due to induced voltages, and with potential electric shock hazards from contact with high-voltage lines. References on possible long-term biological effects of transmission lines are shown. In preparing this booklet, the Bonneville Power Administration has drawn on more than 50 years of experience with high-voltage transmission. BPA operates one of the world`s largest networks of long-distance, high-voltage lines. This system has more than 400 substations and about 15,000 miles of transmission lines, almost 4,400 miles of which are operated at 500,000 volts.

United States. Bonneville Power Administration.

2001-06-01T23:59:59.000Z

497

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

the the Interior Bureau of Land Management Las Vegas Field Office Las Vegas, Nevada March 2004 Interstate Intertie Centennial Plan Environmental Assessment Harry Allen - Mead 500kV Transmission Line DOE/EA-1470 Harry Allen-Mead 500kV Transmission Line Project Harry Allen-Mead 500kV Transmission Line Environmental Assessment 1 Chapter 1 Purpose and Need 1.1 Introduction The construction of new transmission and distribution facilities is required throughout the western United States to meet the increasing demand for power as more people move to many of the fastest growing communities. According to Executive Order 13212 dated May 18, 2001, "The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people...agencies shall take appropriate actions, to the extent

498

EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 34-mile Midway-Moxee transmission line in Benton and Yakima Counties, Washington.

499

Geotechnical, Geological, and Hydrologic Characterization of a 52 km Electrical Power Transmission Line Alignment Route in Southeastern Nigeria  

Science Journals Connector (OSTI)

A 132 kVA electrical transmission line has been proposed to connect the towns ... hydrological study was performed to geotechnically characterize the route alignment and to provide data for design of the foundati...

A. O. Ilori; N. U. Essien; A. E. Edet

2010-11-01T23:59:59.000Z

500

Blythe-Knob\t161-kV\tTransmission\tLine Cross\tArm\tReplacements\t...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 Blythe-Knob 161-kV Transmission Line Cross Arm Replacements - Continuation Sheet Project Description (continued) The wood cross arms on a number of wood H-frame structures have...