Generation and transmission expansion planning for renewable energy integration  

SciTech Connect (OSTI)

In recent years the expansion planning problem has become increasingly complex. As expansion planning (sometimes called composite or integrated resource planning) is a non-linear and non-convex optimization problem, researchers have traditionally focused on approximate models of power flows to solve the problem. The problem has also been split into generation expansion planning (GEP) and transmission network expansion planning (TNEP) to improve computational tractability. Until recently these approximations have produced results that are straight-forward to combine and adapt to the more complex and complete problem. However, the power grid is evolving towards a state where the adaptations are no longer easy (e.g. large amounts of limited control, renewable generation, comparable generation and transmission construction costs) and necessitates new approaches. Recent work on deterministic Discrepancy Bounded Local Search (DBLS) has shown it to be quite effective in addressing the TNEP. In this paper, we propose a generalization of DBLS to handle simultaneous generation and transmission planning.

Bent, Russell W [Los Alamos National Laboratory; Berscheid, Alan [Los Alamos National Laboratory; Toole, G. Loren [Los Alamos National Laboratory

2010-11-30T23:59:59.000Z

2

Dynamic sub-transmission substation expansion planning using learning automata  

Science Journals Connector (OSTI)

This paper presents a new method to solve the dynamic sub-transmission substation expansion planning (SSEP) in electric power distribution networks. The method employs a new algorithm based on learning automata for optimization process. The developed algorithm includes different electrical constraints such as voltage drops, thermal limits, power flow and radial flow constraints. Moreover, prevalent cost indices are taken into consideration. The proposed method is used to solve the dynamic SSEP for Birjand city, center of South-Khorasan province of Iran, up to the year 2024. In addition, effects of the dynamic and pseudo-dynamic planning models are investigated at the study region and the obtained results are compared to those of genetic algorithm. Detailed numerical results and comparisons presented in the paper show that the proposed approach leads to proper solutions and can be used as an effective tool for the dynamic sub-transmission substation expansion planning in an actual large scale distribution network.

Seyed Mahdi Mazhari; Hassan Monsef

2013-01-01T23:59:59.000Z

3

Randomized discrepancy bounded local search for transmission expansion planning  

SciTech Connect (OSTI)

In recent years the transmission network expansion planning problem (TNEP) has become increasingly complex. As the TNEP is a non-linear and non-convex optimization problem, researchers have traditionally focused on approximate models of power flows to solve the TNEP. Existing approaches are often tightly coupled to the approximation choice. Until recently these approximations have produced results that are straight-forward to adapt to the more complex (real) problem. However, the power grid is evolving towards a state where the adaptations are no longer easy (e.g. large amounts of limited control, renewable generation) and necessitates new approaches. Recent work on deterministic Discrepancy Bounded Local Search (DBLS) has shown it to be quite effective in addressing this question. DBLS encapsulates the complexity of power flow modeling in a black box that may be queried for information about the quality of proposed expansions. In this paper, we propose a randomization strategy that builds on DBLS and dramatically increases the computational efficiency of the algorithm.

Bent, Russell W [Los Alamos National Laboratory; Daniel, William B [Los Alamos National Laboratory

2010-11-23T23:59:59.000Z

4

Capricious Cables: Understanding the Key Concepts in Transmission Expansion Planning and Its Models  

SciTech Connect (OSTI)

The extra-high-voltage transmission network is the bulk transport network of the electric power system. To understand how the future power system may react to planning decisions today, wide-area transmission models are increasingly used to aid decision makers and stakeholders. The goal of this work is to illuminate these models for a broader audience that may include policy makers or relative newcomers to the field of transmission planning. This paper explains the basic transmission expansion planning model formulation. It highlights six of the major simplifications made in transmission expansion planning models and the resulting need to contextualize model results using knowledge from other models and knowledge not captured in the modeling process.

Donohoo, P.; Milligan, M.

2014-06-01T23:59:59.000Z

5

The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations  

SciTech Connect (OSTI)

Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

Kirby, Brendan J [ORNL

2006-07-01T23:59:59.000Z

6

A reliability cost-benefit analysis for HVDC transmission expansion planning  

SciTech Connect (OSTI)

A major portion of Manitoba Hydro's generation is located in the North on the Nelson River. The lower Nelson River generation is brought into the load centre in Southern Manitoba through an HVDC transmission system consisting of two bipoles, the first rated at 1680 MW at the rectifier and the second at 2000 MW. This paper presents the methodology used in arriving at the optimum Bipole 3 size using a reliability cost-benefit analysis. The analysis considers the forced outages of the generation and transmission systems using system outage statistics. The generator and valve group maintenance and the reduction in capability of thyristor valve groups during the summer season were also incorporated in the analysis. The load model used in the study was based on system data for the period 1980-1984. The criterion used in choosing the Bipole 3 size is to optimize the present worth value of the annual energy curtailment due to the HVDC system forced outages and the incremental installation cost of the transmission as the capacity of Bipole 3 is increased. The optimum Bipole 3 size based on the study is 2200 MW. This value is significantly lower than that based on a pole spare criterion used in the earlier development of the HVDC system. Finally, the need for validation of the outage data in evaluating future HVDC projects and the need for data collection and classification is indicated.

Kuruganty, P.R.S. (Manitoba Hydro, Winnipeg, Manitoba (CA)); Woodford, D.A. (Manitoba HVDC Research Centre, Winnipeg, Manitoba (CA))

1988-07-01T23:59:59.000Z

7

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan was prepared Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CTF. #12; ii #12; iii

8

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007 Investment Plan was prepared with contribution from the following Energy Commission staff and consultants Kondoleon, Chuck Najarian. 2007 Strategic Transmission Investment Plan. California Energy Commission

9

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

10

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

11

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

12

10-Yr. Transmission Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

13

Marketing Plan for Transmission Planning Services  

E-Print Network [OSTI]

not specifically related to transmission planning and not to outside companies who may require the help in transmission planning. It is essential that we take the market opportunity that currently exists to expand our services to our existing and new clients...

Tu, Linh

2006-12-15T23:59:59.000Z

14

WINDExchange Offshore Wind Webinar: Transmission Planning and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind WINDExchange Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind...

15

Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

16

Recovery Act Interconnection Transmission Planning  

Broader source: Energy.gov [DOE]

Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

17

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

18

Regional Transmission Planning Webinar | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

19

Plan to Conduct Electric Transmission Congestion Study: Federal...  

Broader source: Energy.gov (indexed) [DOE]

Plan to Conduct Electric Transmission Congestion Study: Federal Register Volume 76, No. 218 - Nov. 10, 2011 Plan to Conduct Electric Transmission Congestion Study: Federal Register...

20

Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |  

Broader source: Energy.gov (indexed) [DOE]

Technology Development » Transmission Planning » Technology Development » Transmission Planning » Recovery Act Interconnection Transmission Planning » Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to access each awardee's meeting and events calendar. Eastern Interconnection Topic A Awardee: Eastern Interconnection Planning Collaborative Topic B Awardee: Eastern Interconnection States' Planning Council Western Interconnection Topic A Awardee: Western Electricity Coordinating Council Topic B Awardee: Western Governors' Association Texas Interconnection Topic A and B Awardee: Electric Reliability Council of Texas Electricity Advisory Committee Technology Development Transmission Planning

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

22

Financial Analysis of Electric Sector Expansion Plans (FINPLAN) | Open  

Open Energy Info (EERE)

Financial Analysis of Electric Sector Expansion Plans (FINPLAN) Financial Analysis of Electric Sector Expansion Plans (FINPLAN) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Financial Analysis of Electric Sector Expansion Plans (FINPLAN) Agency/Company /Organization: International Atomic Energy Agency Sector: Energy Focus Area: Renewable Energy, Energy Efficiency Topics: Market analysis Resource Type: Software/modeling tools Website: www-tc.iaea.org/tcweb/abouttc/strategy/Thematic/pdf/presentations/ener References: Overview of IAEA PESS Models [1] "In developing countries, financial constraints are often the most important obstacle to implementing optimal electricity expansion plans. FINPLAN helps assess the financial viability of plans and projects. It takes into account different financial sources - including export credits,

23

Impact of GHG Emission Reduction on Power Generation Expansion Planning  

Science Journals Connector (OSTI)

In this work the impact of greenhouse gas (GHG) emission reduction on Power Generation Expansion Planning ... models, which also consider environmental constraints and GHG emission limits, is presented. After a s...

F. Careri; C. Genesi; P. Marannino; M. Montagna

2012-01-01T23:59:59.000Z

24

10 Year Transmission Plan for the Western Electricity Interconnection  

Broader source: Energy.gov (indexed) [DOE]

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

25

ARM - Lesson Plans: Thermal Expansion of Water  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of sea water expands. It is this thermal expansion of the ocean water which makes the sea level rise. Recently, it was asked why a bunsen burner was heating the Erlenmeyer flask in...

26

216-B-3 expansion ponds closure plan  

SciTech Connect (OSTI)

This document describes the activities for clean closure under the Resource Conservation and Recovery Act of 1976 (RCRA) of the 216-B-3 Expansion Ponds. The 216-B-3 Expansion Ponds are operated by the US Department of Energy, Richland Operations Office (DOE-RL) and co-operated by Westinghouse Hanford Company (Westinghouse Hanford). The 216-B-3 Expansion Ponds consists of a series of three earthen, unlined, interconnected ponds that receive waste water from various 200 East Area operating facilities. The 3A, 3B, and 3C ponds are referred to as Expansion Ponds because they expanded the capability of the B Pond System. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the Bypass pipe (Project X-009). Water discharged to the Bypass pipe flows directly into the 216-B-3C Pond. The ponds were operated in a cascade mode, where the Main Pond overflowed into the 3A Pond and the 3A Pond overflowed into the 3C Pond. The 3B Pond has not received waste water since May 1985; however, when in operation, the 3B Pond received overflow from the 3A Pond. In the past, waste water discharges to the Expansion Ponds had the potential to have contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the dangerous waste portion of mixed waste is regulated under RCRA.

Not Available

1994-10-01T23:59:59.000Z

27

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Broader source: Energy.gov (indexed) [DOE]

A, A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning

28

Interconnection-Wide Transmission Planning Initiative: Topic B, State  

Broader source: Energy.gov (indexed) [DOE]

State Agency Input Regarding Electric Resource and Transmission Planning in State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection A description of the requirements for Topic B for the Texas Interconnect under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the

29

Powering the people: India's capacity expansion plans  

SciTech Connect (OSTI)

India has become a global business power even though hundreds of millions of its citizens still live in poverty. To sustain economic growth and lift its people out of poverty, India needs more and more reliable power. Details of government plans for achieving those goals demonstrate that pragmatism may be in shorter supply than ambition and political will. 1 ref., 12 figs., 1 tab.

Patel, S.

2009-05-15T23:59:59.000Z

30

DOE Action Plan Addressing the Electricity Transmission System  

Broader source: Energy.gov (indexed) [DOE]

U.S. DEPARTMENT OF ENERGY U.S. DEPARTMENT OF ENERGY ACTION PLAN ADDRESSING THE ELECTRICITY TRANSMISSION SYSTEM ~DRAFT~ DOE Action Plan Addressing the Electricity Transmission System 1 Table of Contents * INTRODUCTION ................................................................................................................... 2 The Grid Tech Team ...................................................................................................... 2 Focus on Transmission .................................................................................................. 3 Roadmap Goals ............................................................................................................. 4 * PROCESS OVERVIEW ........................................................................................................... 5

31

Biennial Assessment of the Fifth Power Plan Transmission Issues  

E-Print Network [OSTI]

by the partners in the Colstrip 500 kV transmission lines (Northwestern Energy, Puget Sound Energy, Portland unscheduled electricity flows over transmission lines leading to increased risks to electric systemBiennial Assessment of the Fifth Power Plan Transmission Issues INTRODUCTION The Fifth Power Plan

32

Mirror Film Company Has 'Concentrated' Plans for Expansion | Department of  

Broader source: Energy.gov (indexed) [DOE]

Mirror Film Company Has 'Concentrated' Plans for Expansion Mirror Film Company Has 'Concentrated' Plans for Expansion Mirror Film Company Has 'Concentrated' Plans for Expansion September 10, 2010 - 1:19pm Addthis Lorelei Laird Writer, Energy Empowers In concentrating solar power, glass is king-but it's fighting to hold on to its crown. The reflectivity of glass mirrors makes them a great choice for focusing sunlight onto a heat generator. However, the glass mirrors can be expensive and heavy -- reducing their ability to compete with conventional energy sources. ReflecTech Inc. has an option: a silvered polymer-based film that does the same job, but with half the weight and cost. Using that film, the company can make 100,000 square feet of mirror panels per year at its factory in Arvada, Colo. Through an Advanced Manufacturing 48C tax credit through the Recovery Act,

33

Abstract --The need to determine adequate regulations in the transmission activity in deregulated environments does not  

E-Print Network [OSTI]

be followed. Index Terms--Transmission expansion, Transmission planning, Transmission systems, Transmission pricing, Open access. I INTRODUCTION he presence of economies of scale and the specificity

Dixon, Juan

34

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic B, Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

35

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Initiative: Topic B, Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

36

Microsoft Word - DOE RFI on Transmission Planning - PGE Comments...  

Energy Savers [EERE]

approach to guiding development toward appropriate locations within the southern California deserts, while also providing a road map for transmission planning in these regions....

37

Technology Transfer Expansion Planned UTCA is conducting a major project  

E-Print Network [OSTI]

Technology Transfer Expansion Planned UTCA is conducting a major project to evaluate and extend its technology transfer activities (UTCA project 03217). Steven Jones and David Eckhoff of UAB are working to expand the current technology transfer program to showcase the successes of the UTCA projects. Samples

Carver, Jeffrey C.

38

NREL: Energy Analysis: Transmission Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

39

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Planning (Xcel). 2006. Wind Integration Study Report OfTransmission Vision for Wind Integration. White Paper.Charles Smith (Utility Wind Integration Group), Lynn Coles (

Mills, Andrew D.

2009-01-01T23:59:59.000Z

40

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

Cost with Starting Point Assumptions ($/MWh) Energy- Weighted Median (10th; 90th Percentile) Hydro Biomass Geothermalenergy levels on resource composition, costs, and transmission expansion Impact 12% Renewables (TWh/yr) Geothermal

Mills, Andrew D

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Meter Expansion Plan Existing Multi-Space Meter  

E-Print Network [OSTI]

Meter Expansion Plan 11 35 9 7 10 20 12 11 12 46 23 15 15 60 23 Existing Multi-Space Meter Split Regulations 136 New Multi-Space Meter Visitor Only New Multi-Space Meter Split Regulations KEY 97 Updated 7/8/13 11 5 #12;HAVE.HAVE. UNION DR. 1 2 3 4 5 New Multi-space Meter After: 5 Meter Spaces Regulations

Duchowski, Andrew T.

42

On optimal multistage electric power distribution networks expansion planning  

Science Journals Connector (OSTI)

Abstract The optimal expansion planning of electric power distribution network to meet system load growth and overcome to pseudo dynamic behavior of network parameters considering a large number of constraints is a hard satisfactory multiobjective optimization problem. This paper implements new developed Imperialist Competitive Algorithm (ICA) for the optimal expansion planning of distribution network. The topology of medium voltage (MV) distribution network as backbone of electric power distribution systems is designed by optimal sizing, siting and timing of medium voltage network components such as HV substation and MV feeders routes. A multistage expansion planning is proposed to consider dynamic behavior of the system parameters asset management and geographical constraints. In order to reach the global solution an efficient coding is developed for ICA parameters. The Greedy algorithm is used to solve the minimum spanning tree problem to construct a radial configuration of the mesh network. At each stage of the problem the results are fully illustrated either by figures or by tables. A sensitivity analysis is used to show the robustness of the results with respect to ICA parameters variation. The obtained results are compared with GA as well known heuristic optimization tool. The efficiency and capability of the methodology has been tested on an under developed relatively large-scale distribution network.

S. Najafi Ravadanegh; R. Gholizadeh Roshanagh

2014-01-01T23:59:59.000Z

43

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Broader source: Energy.gov (indexed) [DOE]

Cooperation Among States in the Western Interconnection on Electric Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Western Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning

44

West Elk Mine expansion and degasification plans approved  

SciTech Connect (OSTI)

West Elk Mine recently applied for and received approval for an expansion of its mining and methane drainage operation sin Gunnison County, Colorado. The deliberation over this planned expansion among several federal agencies and other groups received considerable local press coverage. One of the key issues focused on the fate of the additional; methane that would be emitted from the mine's degasification system. This article summarizes this process, which highlights the numerous barriers that still affect many coal mine methane (CMM) project opportunities is the United states. As the debate over climate change legislation moves forward in the US Congress and awareness of greenhouse gas emissions increases around the country, lawmakers, regulators, and non-governmental organizations will continue to focus more attention on CMM reduction opportunities,.

NONE

2008-04-01T23:59:59.000Z

45

AC transmission system planning choosing lines from a discrete set  

E-Print Network [OSTI]

Transmission system planning (TSP) is a difficult nonlinear optimization problem involving non-convex quadratic terms, as well as discrete variables. We extend prior results for linear relaxations, drawing on a preliminary ...

Gilbertson, Eric W.

2013-04-24T23:59:59.000Z

46

Federal Register Notice: Plan for Conduct of 2012 Electric Transmission  

Broader source: Energy.gov (indexed) [DOE]

Notice: Plan for Conduct of 2012 Electric Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study November 10, 2011 - 1:42pm Addthis The Department has issued a Federal Register Notice initiating preparations for development of the 2012 National Electric Transmission Congestion Study. The Department is seeking comments on what publicly-available data and information should be considered, and what types of analysis should be performed to identify and understand the significance and character of transmission congestion. DOE will host four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the study. Addthis Related Articles 2012 Congestion Study Workshops to be Held in December; Agendas Now

47

Transmission Expansion Planning with Re-design - Optimization ...  

E-Print Network [OSTI]

Proof. We show how to write a Steiner-tree graph problem in the form (TEP), by suitably choosing ...... In the objective function above, each penalty factor ph.

2010-05-17T23:59:59.000Z

48

Transmission investment and expansion planning in a restructured electricity market  

E-Print Network [OSTI]

such as phase shifting transformers (PST), high-voltage direct-current (HVDC) lines, and other power

Leung, Ka-Cheong

49

Recovery Act Interconnection Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Act Interconnection Act Interconnection Transmission Planning Recovery Act Interconnection Transmission Planning View a Map of the Interconnections View a Map of the Interconnections Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. Pursuant to Title IV of the American Reinvestment and Recovery Act (2009), the Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48

50

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

SciTech Connect (OSTI)

The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this paper we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33percent of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33percent RE target across nearly all scenarios analyzed (38-65percent). Solar energy is almost always the second largest source (14-41percent). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Further, we find that even with total transmission expenditures of $17-34 billion these costs still represent just 10-19percent of the total delivered cost of renewable energy.

Mills, Andrew D.; Phadke, Amol A.; Wiser, Ryan H.

2010-06-10T23:59:59.000Z

51

Exploration of resource and transmission expansion decisions in the Western Renewable Energy Zone initiative  

Science Journals Connector (OSTI)

The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this paper we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33% of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33% RE target across nearly all scenarios analyzed (3865%). Solar energy is almost always the second largest source (1441%). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Further, we find that even with total transmission expenditures of $1734 billion these costs still represent just 1019% of the total delivered cost of renewable energy.

Andrew Mills; Amol Phadke; Ryan Wiser

2011-01-01T23:59:59.000Z

52

Regulatory Factors and Capacity-Expansion Planning in Global Chemical Supply Chains  

Science Journals Connector (OSTI)

In what follows, we first extensively review the existing work on capacity-expansion planning to highlight the scarcity of literature considering regulatory factors. ... The model determines new processes, expansion plans, and shutdown policies to maximize the net present value of a project given the forecasts of prices and demands of the chemicals over a long planning horizon. ... Using the sales forecast from the marketing division, the multinational company wishes to develop an optimum, strategic, and global capacity-expansion plan over a planning horizon of T fiscal years or periods (t = 1, 2, ..., T). ...

Hong-Choon Oh; I. A. Karimi

2004-05-28T23:59:59.000Z

53

Dynamic simulation method for transmission and distribution planning  

Science Journals Connector (OSTI)

Under the conditions of liberalised market development optimisation role is not to be decreasing but even increasing. Basic definitions and model structure of optimisation system under market conditions is discussed in a paper, as well the experience ... Keywords: development optimisation, liberalised electricity market, power generation, power system planning, power system simulation, power transmission, risk analysis, uncertainty

Z. Krishans; I. Oleinikova; A. Mutule; J. Runcs

2006-12-01T23:59:59.000Z

54

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

SciTech Connect (OSTI)

Building transmission to reach renewable energy (RE) goals requires coordination among renewable developers, utilities and transmission owners, resource and transmission planners, state and federal regulators, and environmental organizations. The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this report we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33% of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Of the renewable resources in WREZ resource hubs, and under the assumptions described in this report, our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33% RE target across nearly all scenarios analyzed (38-65%). Solar energy is almost always the second largest source (14-41%). Solar exceeds wind by a small margin only when solar thermal energy is assumed to experience cost reductions relative to all other technologies. Biomass, geothermal, and hydropower are found to represent a smaller portion of the selected resources, largely due to the limited resource quantity of these resources identified within the WREZ-identified hubs (16-23% combined). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Uncertainties and policies that impact bus-bar costs are the most important to evaluate carefully, but factors that impact transmission costs and the relative market value of each renewable option can also be important. Under scenarios in which each load zone must meet 33% of its load with delivered renewable energy from the WREZ-identified resource hubs, the total transmission investment required to meet the 33% west-wide RE target is estimated at between $22 billion and $34 billion. Although a few of the new transmission lines are very long - over 800 miles - most are relatively short, with average transmission distances ranging from 230-315 miles, depending on the scenario. Needed transmission expenditure are found to decline to $17 billion if wide use of renewable energy credits is allowed; consideration of renewable resources outside of WREZ-identified hubs would further reduce this transmission cost estimate. Even with total transmission expenditures of $17-34 billion, however, these costs still represent just 10-19% of the total delivered cost of renewable energy.

Mills, Andrew; Phadke, Amol; Wiser, Ryan

2010-02-16T23:59:59.000Z

55

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network [OSTI]

stakeholders in transmission-line route planning and sitingan optimal transmission line route-finding tool. This tool

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

56

Impact of unit commitment constraints on generation expansion planning with renewables  

E-Print Network [OSTI]

Growing use of renewables pushes thermal generators against operating constraints - e.g. ramping, minimum output, and operating reserves - that are traditionally ignored in expansion planning models. We show how including ...

Palmintier, Bryan Stephen

57

Planning considerations for the intermountain HVDC transmission system  

SciTech Connect (OSTI)

Planning of an HVDC transmission system embedded into an existing ac network may require unique control and converter equipment capability in order to satisfy stability requirements of the network. The planning and design of the Intermountain Power Project HVDC transmission system are based on unique control performance features for power transfers during terminal ac faults, rapid power recovery following fault clearing and utilization of exceptionally high transient overload capability of 2 per unit during the post-fault period to maintain system stability. The Department, in its efforts to meet the Western Systems Coordinating Council's (WSCC) reliability criteria, developed and incorporated into its HVDC specifications very rigorous reliability and availability requirements. One objective of this project was to attain the unusually low bipolar converter system outage frequency goal of one outage in five years to achieve a bipole performance rating equivalent to two ac circuits of similar capability. The reliability goals of this project have provided one of the impetus for revisions to the WSCC Reliability Criteria for System Design. The reliability goals and other features adopted for the Intermountain HVDC transmission system are discussed in this paper and study results are included to demonstrate the effectiveness of various controls implemented as stability enhancement techniques.

Lee, R.L.; Beshir, M.J.; Gee, J.H.

1986-01-01T23:59:59.000Z

58

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

nearest transmission system substation, and are derived fromthe nearest transmission substation, the capacity factor of

Mills, Andrew D

2011-01-01T23:59:59.000Z

59

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Equipment Transmission Lines 765 kV (no description) 500Montana-Alberta Tie 230 kV Transmission Line: TransmissionMontana-Alberta Tie 230 kV Transmission Line: Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

60

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

nearest transmission system substation, and are derived fromthe nearest transmission substation, the capacity factor ofor above) transmission substation. Capital costs vary for

Mills, Andrew

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Multiobjective electric distribution system expansion planning using hybrid energy hub concept  

Science Journals Connector (OSTI)

This paper presents a novel approach for optimal electric distribution system expansion planning (OEDSEP) using a hybrid energy hub concept. The proposed method uses an energy hub model to explore the impacts of energy carrier systems on OEDSEP procedure. This algorithm decomposes the OEDSEP problem into three subproblems to achieve an optimal expansion planning of a system in which the investment and operational costs are minimized, while the reliability of the system is maximized. The algorithm was successfully tested in the present research for an urban distribution system.

Mehrdad Setayesh Nazar; Mahmood R. Haghifam

2009-01-01T23:59:59.000Z

62

OPEC production: Capital limitations, environmental movements may interfere with expansion plans  

SciTech Connect (OSTI)

Obtaining capital is a critical element in the production expansion plans of OPEC member countries. Another issue that may impact the plans is the environmental taxes that may reduce the call on OPEC oil by 5 million b/d in 2000 and about 16 million b/d in the year 2010. This concluding part of a two-part series discusses the expansion possibilities of non-Middle East OPEC members, OPEC's capital requirements, and environmental concerns. Non-Middle East OPEC includes Algeria, Gabon, Indonesia, Libya, Nigeria, and Venezuela.

Ismail, I.A.H. (Organization of the Petroleum Exporting Countries, Vienna (Austria))

1994-05-09T23:59:59.000Z

63

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

building a new 500 kV transmission line delivering roughlycost 500 kV HVDC lines rather than the New Transmission1500 MW, 500 kV lines. Cooperative transmission investments

Mills, Andrew D

2011-01-01T23:59:59.000Z

64

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

building a new 500 kV transmission line delivering roughlyinvestment in a 500 kV transmission line delivering 1,500 MWthe fact that 500 kV transmission lines can only be built in

Mills, Andrew

2010-01-01T23:59:59.000Z

65

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

SEC). 2008. Form 10-K: Xcel Energy Inc. http://www.sec.gov/cost of transmission proposed in Xcel Energy 2001). SouthernApril. http://www.ftloutreach.com Xcel Energy Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

66

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network [OSTI]

at: http://www.ftloutreach.com Xcel Energy, TransmissionCBED CapX Utilities Midwest Xcel Energy Voluntary UtilityElectric Transmission Study Xcel-31A Southwest Power Pool (

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

67

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

NREL/CP-500-35969. Global WindPower Conference. Chicago,Transmission Projects. Windpower 2007 Conference. Los

Mills, Andrew D.

2009-01-01T23:59:59.000Z

68

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

2006. Transmission and Wind Energy: Capturing the Prevailingand Renewable Energy (Wind & Hydropower Technologiesand Renewable Energy Wind & Hydropower Technologies Program

Mills, Andrew D.

2009-01-01T23:59:59.000Z

69

Introduction Framework Multiscale Expansion Axisymmetric Problems FEM Simulations Postprocessing A Transmission Problem in Electromagnetism with a  

E-Print Network [OSTI]

A Transmission Problem in Electromagnetism with a Singular Interface GABRIEL CALOZ 2 MONIQUE DAUGE 2 ERWAN FAOU 2´eron A Transmission Problem in Electromagnetism with a Singular Interface 1 / 33 inria-00528523,version1-22Oct2010 of electromagnetic fields with depth inside the conductor. The Skin Depth : () = 2/µ0 V. P´eron A Transmission

Paris-Sud XI, Université de

70

Incorporating Energy Efficiency into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Columbia Transmission Corporation BPA Bonneville Powerthis treatment vary. For BPA and most of the northwesternPACW broader adjustment BPA, CHPD, DOPD, GCPD, TPWR: Impact

Barbose, Galen

2014-01-01T23:59:59.000Z

71

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

value for all renewable resource and load zone combinationsvalue for all renewable resource and load zone combinationsidentify attractive renewable resources and the transmission

Mills, Andrew

2010-01-01T23:59:59.000Z

72

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

from existing state renewable energy policy requirements,for renewable energy to different assumptions and policiesrenewable energy procurement, technology cost, transmission, and policy

Mills, Andrew D

2011-01-01T23:59:59.000Z

73

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

from existing state renewable energy policy requirements,renewable energy procurement, technology cost, transmission, and policypolicies (including renewable development and energy

Mills, Andrew

2010-01-01T23:59:59.000Z

74

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Estimates of Congestion Costs. The Electricity Journal 17,Incremental Transmission Costs Due to Wind Power. Rockville,and Intermittency Really Cost? Supply Curves for Electricity

Mills, Andrew D.

2009-01-01T23:59:59.000Z

75

Department of Industrial Engineering Fall 2011 Transmission Component Reverse Engineering and Process Planning  

E-Print Network [OSTI]

PENNSTATE Department of Industrial Engineering Fall 2011 Transmission Component Reverse Engineering to fabricate the parts in the Industrial Engineering Department Factory for Advanced Manufacturing Education of the transmission to reverse engineer and develop process plans for efficient fabrication in a low volume setting

Demirel, Melik C.

76

Incorporating Energy Efficiency into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Springs Utilities Demand-Side Management Potential Study and2009. Idaho Power Demand Side Management Potential Study.2012 Long-Term Demand Side Management Plan. Pending further

Barbose, Galen

2014-01-01T23:59:59.000Z

77

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

of incremental wind development. At the extreme, still otherextreme assumption, the implied unit cost of transmission for windon wind power in their analysis. On one extreme, a number of

Mills, Andrew D.

2009-01-01T23:59:59.000Z

78

Electric Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

79

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

80

Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.  

SciTech Connect (OSTI)

The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Microsoft PowerPoint - FY12 RMR - CRSP TRANSMISSION PLANNING MEETING_Final.PPT [Compatibility Mode]  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

TRANSMISSION TRANSMISSION PLANNING MEETING PLANNING MEETING December 6, 2011 December 6, 2011 1 Agenda g Introductions CRSP North (Loveland) Program CRSP South (Phoenix) Program CRSP South (Phoenix) Program Open Forum 2 CRSP North (Loveland) ( ) Capital Program Transmission Lines Substations Communications Communications Control, Protection and Metering M bil & H E i t Mobile & Heavy Equipment Programmatic Improvements 3 Transmission Lines Line Equipment Replacements 50k in FY12 & every year after Pleasant View 24.9-kV Line Replacement Estimated Project Cost (EPC) $ 1,000k FY15 $200K FY16 $800K 4 Substations Annual Equipment Replacement Program Substation Test Equipment Combined all test equipment categories under movable property, "Test Equipment Replacements"

82

Transmission Planning Process and Opportunities for Utility-Scale Solar Engagement within the Western Electricity Coordinating Council (WECC)  

SciTech Connect (OSTI)

This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. Market barriers unrelated to technology often limit the expansion of utility-scale solar power, even in areas with exceptional resource potential. Many of these non-technical barriers have to do with policy, regulation, and planning, and hardly ever do they resolve themselves in a timely fashion. In most cases, pre-emptive intervention by interested stakeholders is the easiest way to remove/address such barriers, but it requires knowing how to navigate the institutional waters of the relevant agencies and boards. This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. It focuses on the Western Interconnection (WI), primarily because the quality of solar resources in the Southwest makes utility-scale concentrating solar power (CSP) and photovoltaics (PV) economically feasible, and because the relevant institutions have evolved in a way that has opened up opportunities for removing non-technical market barriers. Developers will find in this report a high-level field manual to identify the venues for mitigating and possibly eliminating systemic market obstacles and ensuring that the economic playing field is reasonably level. Project-specific issues such as siting for transmission and generation resources are beyond the scope of this report. Instead, the aim is to examine issues that pervasively affect all utility-scale PV and CSP in the region regardless of where the project may be. While the focus is on the WI, many of the institutions described here also have their counterparts in the Eastern and the Texas interconnections. Specifically, this report suggests a number of critical engagement points relating to generation and transmission planning.

Hein, J.; Hurlbut, D.; Milligan, M.; Coles, L.; Green, B.

2011-11-01T23:59:59.000Z

83

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

500 and 230 kV 765 kV and 800 kV HVDC 500 and 230 kV 500 kVmi) 138 and 345 kV 345 kV 345 kV 345 kV and HVDC 345kV and HVDC 345 kV 345 kV Note: Total transmission cost is

Mills, Andrew D.

2009-01-01T23:59:59.000Z

84

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network [OSTI]

California Energy Commission Transmission Planning Analysis92, No. 5, Dec. CEC (California Energy Commission). 2004.of MCPs. California Energy Commission. Nov. CERTS PIER

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

85

Distribution expansion planning considering reliability and security of energy using modified PSO (Particle Swarm Optimization) algorithm  

Science Journals Connector (OSTI)

Abstract Distribution feeders and substations need to provide additional capacity to serve the growing electrical demand of customers without compromising the reliability of the electrical networks. Also, more control devices, such as DG (Distributed Generation) units are being integrated into distribution feeders. Distribution networks were not planned to host these intermittent generation units before construction of the systems. Therefore, additional distribution facilities are needed to be planned and prepared for the future growth of the electrical demand as well as the increase of network hosting capacity by DG units. This paper presents a multiobjective optimization algorithm for the MDEP (Multi-Stage Distribution Expansion Planning) in the presence of \\{DGs\\} using nonlinear formulations. The objective functions of the MDEP consist of minimization of costs, END (Energy-Not-Distributed), active power losses and voltage stability index based on SCC (Short Circuit Capacity). A MPSO (modified Particle Swarm Optimization) algorithm is developed and used for this multiobjective MDEP optimization. In the proposed MPSO algorithm, a new mutation method is implemented to improve the global searching ability and restrain the premature convergence to local minima. The effectiveness of the proposed method is tested on a typical 33-bus test system and results are presented.

Jamshid Aghaei; Kashem M. Muttaqi; Ali Azizivahed; Mohsen Gitizadeh

2014-01-01T23:59:59.000Z

86

Review of Jamaica Public Service Company, Ltd. least-cost expansion plan.  

SciTech Connect (OSTI)

Argonne National Laboratory has been asked to review the least-cost expansion plan (LCEP) of the Jamaica Public Service Company, Ltd. (JPSCo). The material that has been initially provided to Argonne included: (1) An electronic copy of the data and results from JPSCo's running the WASP electric system expansion planning model, (2) Approximately 20 pages of a document 'JPSCo Generation Expansion Plan', marked 'DRAFT 002', date unknown, and (3) The report 'JPSCo Least Cost Generation Expansion Plans, (1999-2009)', January 1999. It was noticed that the 20 pages from the 'DRAFT 002' document were different from the January 1999 report. An explanation was provided to Argonne that the excerpt was from an earlier draft and that the review should focus on the January 1999 report. Further, the electronic copy of the WASP case did not correspond to either the January 1999 report or to the 20-page excerpt. Again, the reason for these discrepancies was that the WASP case provided to Argonne was an earlier case and not the final one that was presented in the report. Based on the review of the available material, Argonne experts have prepared and submitted to the National Investment Bank of Jamaica (NIBJ) a preliminary draft report containing the initial findings, comments, questions and observations. As many of the comments and questions raised in the preliminary review needed to be discussed with the appropriate staff of JPSCo and other Jamaican experts, a 3-day mission to Jamaica was carried out by one Argonne expert (V. Koritarov) in the period July 20-23, 1999. Besides JPSCo experts, the discussions and the review of the LCEP during the mission included several experts from NIBJ, Ministry of Energy, and the Petroleum Corporation of Jamaica. Mr. Koritarov also worked with the JPSCo technical staff to reconstruct the WASP base case that was used as a basis for the January 1999 report. The first step was to verify that the results obtained after the resimulation of this case were identical to those presented in the January 1999 report. Then, in the next step, the Argonne expert and JPSCo team reviewed this case in detail and performed certain modifications and improvements of data where necessary. These modifications and data adjustments resulted in a new base case that served as a basis for further review and for the sensitivity analyses. Several sensitivity analyses were performed together with JPSCo experts and the results were discussed with the JPSCo management and other Jamaican experts at the end of the mission. Additional sensitivity analyses, as well as the cases for high and low load forecasts, were conducted by Mr. Koritarov after returning from Jamaica. The main findings of the review and issues that have been discussed with the Jamaican team can be summarized.

Koritarov, V.; Buehring, W.; Cirillo, R.; Decision and Information Sciences

2008-02-28T23:59:59.000Z

87

Plan to Conduct Electric Transmission Congestion Study: Federal Register Volume 76, No. 218- Nov. 10, 2011  

Broader source: Energy.gov [DOE]

Section 216(a)(1) of the Federal Power Act (FPA) requires the Department of Energy to complete a study of electric transmission congestion every three years. On November 10, 2011, the Department issued a plan to conduct the current Congestion Study.

88

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

large, but conceptual, transmission lines such as the C/PNW-very conceptual transmission lines that resemble radialand voltage of transmission lines added in the study, as

Wiser, Ryan

2014-01-01T23:59:59.000Z

89

Microsoft Word - DOE RFI on Transmission Planning - PGE Comments.DOC  

Broader source: Energy.gov (indexed) [DOE]

Comments of Pacific Gas & Electric Company Comments of Pacific Gas & Electric Company Department of Energy Request for Information on Transmission Permitting [OE Docket No. RRTT-IR-001] Pacific Gas & Electric Company (PG&E) appreciates the opportunity to respond to the questions from the Department of Energy (DOE) in its Request for Information (RFI) related to the permitting of transmission lines. The RFI lists six (6) questions, several of them with subparts. PG&E responds to the questions sequentially as they are listed in the RFI. As discussed in more detail below, increased alignment across the federal, state and local agencies for permitting and improved planning coordination would improve the development time for transmission and generation. Improved focus on planning would result in a more

90

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

wind with transmission alternative 7b (500 kV AC line fromkV line CAISO - A4 Central California Clean Energy TransmissionTransmission Line: Transmission Development Facilities Application Volume One MATL New 230 kV

Wiser, Ryan

2014-01-01T23:59:59.000Z

91

Energy-water analysis of the 10-year WECC transmission planning study cases.  

SciTech Connect (OSTI)

In 2011 the Department of Energy's Office of Electricity embarked on a comprehensive program to assist our Nation's three primary electric interconnections with long term transmission planning. Given the growing concern over water resources in the western U.S. the Western Electricity Coordinating Council (WECC) requested assistance with integrating water resource considerations into their broader electric transmission planning. The result is a project with three overarching objectives: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western Interconnection to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Western States Water Council (WSWC) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and WSWC. The foundation for the Energy-Water DSS is Sandia National Laboratories Energy-Power-Water Simulation (EPWSim) model (Tidwell et al. 2009). The modeling framework targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. This framework provides an interactive environment to explore trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., state, county, watershed, interconnection). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. The framework currently supports modules for calculating water withdrawal and consumption for current and planned electric power generation; projected water demand from competing use sectors; and, surface and groundwater availability. WECC's long range planning is organized according to two target planning horizons, a 10-year and a 20-year. This study supports WECC in the 10-year planning endeavor. In this case the water implications associated with four of WECC's alternative future study cases (described below) are calculated and reported. In future phases of planning we will work with WECC to craft study cases that aim to reduce the thermoelectric footprint of the interconnection and/or limit production in the most water stressed regions of the West.

Tidwell, Vincent Carroll; Passell, Howard David; Castillo, Cesar; Moreland, Barbara

2011-11-01T23:59:59.000Z

92

WECC 10-Year Plan general presentation  

Broader source: Energy.gov (indexed) [DOE]

Bradley Nickell Bradley Nickell Director of Transmission Planning Regional Transmission Expansion Planning (RTEP) DOE EAC Meeting October 20, 2011 2 Regional Transmission Expansion Planning What have we been asked to do? Regional Transmission Expansion Planning (RTEP) Expand the breadth and depth of WECC's existing regional transmission planning processes. * Expand stakeholder participation * Increase the understanding of the connection between reliability, cost, and environment * Produce credible, publically available data and models 3 RTEP Organizational Funding Diagram VGS Integration Topic B WGA WIRAB/CREPC Public Policy $12.0M WREZ Phases 3 & 4 National Labs Request for Technical Assistance/Coordination Topic A WECC/TEPPC Interconnection-wide Planning $14.5M Columbia

93

A scenario driven multiobjective PrimarySecondary Distribution System Expansion Planning algorithm in the presence of wholesaleretail market  

Science Journals Connector (OSTI)

This paper presents a novel approach for Integrated Generation and PrimarySecondary Distribution System Expansion Planning (IGDSEP) in the presence of wholesale and retail markets. The proposed method uses a model to explore the impacts of wholesale and retail market on IGDSEP procedure. This algorithm decomposes the IGDSEP problem into six subproblems to achieve an optimal expansion planning of a system, in which the investment and operational costs are minimized, while the reliability of the system is maximized. The proposed model of IGDSEP is a Mixed Integer Non Linear Programming (MINLP) problem and a Scenario Driven MINLP (SCMINLP) method is proposed for solving the problem. The algorithm was successfully tested for an urban distribution system.

Mehrdad Setayesh Nazar; Mahmood R. Haghifam; Mhran Naar

2012-01-01T23:59:59.000Z

94

Transmission  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

95

Abstract-Electricity transmission planning does not have a common solution worldwide, with most countries trusting on  

E-Print Network [OSTI]

Abstract- Electricity transmission planning does not have a common solution worldwide, with most-growing conditions of the Chilean energy market, driven by private agents, meant the need to introduce changes issue in the restructuring of the electricity market all over the world. Transmission systems costs

Catholic University of Chile (Universidad Católica de Chile)

96

Using a Collaborative Approach to Interconnection-Wide Transmission Analyses  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Planning in Interconnection-Wide Planning in the Eastern Interconnection EIPC Update for the DOE Electricity Advisory Committee October 20, 2011 David A. Whiteley Presentation Topics * Update on process and structure * Study results so far * Value unlocked * What's next 2 Update on Process and Structure * EIPC - 26 EI Planning Authorities (Planning Coordinators) * Integrate and analyze approved regional plans * Develop interregional expansion scenarios to be studied * Develop interregional transmission expansion options * Consistent with Orders 890 and 1000 * Self-funded * Primary activity is DOE funded interconnection studies project - 2 phases 3 Who are the PAs? * Alcoa Power Generating * American Transmission Co. * Duke Energy Carolinas * Electric Energy Inc. * Entergy *

97

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

SEC). 2008. Form 10-K: Xcel Energy Inc. http://www.sec.gov/cost of transmission proposed in Xcel Energy 2001). SouthernApril. http://www.ftloutreach.com Xcel Energy Transmission

Wiser, Ryan

2014-01-01T23:59:59.000Z

98

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

99

On Integrating Theories of International Economics in the Strategic Planning of Global Supply Chains and Dynamic Supply Chain Reconfiguration with Capacity Expansion and Contraction  

E-Print Network [OSTI]

of the dissertation deals with the DSCR model with capacity expansion and contraction. The strategic dynamic supply chain reconfiguration (DSCR) problem is to prescribe the location and capacity of each facility, select links used for transportation, and plan...

Lee, Chaehwa

2012-02-14T23:59:59.000Z

100

Eastern Interconnection Planning Collaborative News Release | Department of  

Broader source: Energy.gov (indexed) [DOE]

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes 2012 National Electric Transmission Congestion Study - Philadelphia Workshop EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Audit Report - Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009  

Broader source: Energy.gov (indexed) [DOE]

Audit Report Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009 OAS-RA-13-26 June 2013 Department of Energy Washington, DC 20585 June 19, 2013 MEMORANDUM FOR THE ASSISTANT SECRETARY FOR ELECTRICITY DELIVERY AND ENERGY RELIABILITY FROM: Rickey R. Hass Deputy Inspector General for Audit and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009" BACKGROUND Under the American Recovery and Reinvestment Act of 2009 (Recovery Act), the Department of

102

Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bulk Electric Power Systems: Bulk Electric Power Systems: Operations and Transmission Planning Volume 4 of 4 Volume 2 PDF Volume 3 PDF Volume 1 PDF Volume 4 PDF NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable Energy Laboratory Baldwin, S. U.S. Department of Energy DeMeo, E. Renewable Energy Consulting Services, Inc. Reilly, J.M. Massachusetts Institute of Technology Mai, T. National Renewable Energy Laboratory Arent, D. Joint Institute for Strategic Energy Analysis Porro, G. National Renewable Energy Laboratory Meshek, M. National Renewable Energy Laboratory Sandor, D. National Renewable

103

State Environmental Policy Act (SEPA) Environmental Checklist Form 216-B-3 Expansion Ponds Closure Plan. Revision 1  

SciTech Connect (OSTI)

The 216-B-3 Expansion Ponds Closure Plan (Revision 1) consists of a Part A Dangerous Waste Permit Application and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. The 216-B-3 Pond System consists of a series of four earthen, unlined, interconnected ponds and the 216-B-3-3 Ditch that receive waste water from various 200 East Area operating facilities. These four ponds, collectively. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the 216-B-3-3 Ditch. Water discharged to the 216-8-3-3 Ditch flows directly into the 216-B-3 Pond. In the past, waste water discharges to B Pond and the 216-B-3-3 Ditch contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the nonradioactive dangerous portion of mixed waste is regulated under RCRA. Mixed waste also may be considered a hazardous substance under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) when considering remediation of waste sites.

Not Available

1993-12-01T23:59:59.000Z

104

Report: Impacts of Demand-Side Resources on Electric Transmission Planning  

Broader source: Energy.gov [DOE]

Demand for new transmission can be driven by different factors, including connection of new generation, reliability, economics, environmental policy compliance and replacement of retiring infrastructure. This report assesses the relationship between high levels of demand-side resources (including end-use efficiency, demand response, and distributed generation) and investment in new transmission or utilization of existing transmission.

105

Transmission planning for Indian power grid: a mixed integer programming approachp  

E-Print Network [OSTI]

) time-block (peak, intermediate, base) l index for transmission line voltage level (400, 220 and 132 kV transmission line, Rs/km LCAP power carrying capacity of an inter-state tie line for a particular voltage class, MW LF transmission loss factor per unit power transfer per km line length, MWh/MWh- km LGTH length

Dragoti-?ela, Eranda

106

Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.  

SciTech Connect (OSTI)

Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

107

Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project (DOE/EIS-0128) (12/3/03)  

Broader source: Energy.gov (indexed) [DOE]

2 Date: December 3, 2003 1 2 Date: December 3, 2003 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a power marketing administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi-use water projects in the western United States, including California. The Path 15 Project, located in California's western

108

(DOE/EIS-0128): Mitigation Action Plan for the Los Banos-Gates Transmission project 1/28/03  

Broader source: Energy.gov (indexed) [DOE]

Date: ____________________________ 1 Date: ____________________________ 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a Power Marketing Administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi- use water projects in the western United States, including California. The

109

Substation Expansion Planning  

Science Journals Connector (OSTI)

Consider an 11-load node case as depicted in Fig.7.1..., fed in 33kV and to be supplied through high-voltage (HV) substation(s) (say 230kV:33kV)... Fig.7.1 ...

Hossein Seifi; Mohammad Sadegh Sepasian

2011-01-01T23:59:59.000Z

110

Planning and processing of new or upgraded electric transmission systems in New Mexico  

SciTech Connect (OSTI)

RETA has been requested to identify and prioritize renewable energy resource zones in New Mexico that have a potential to support industry development among renewable energy developers for renewable resource generation projects. Moreover, Senate Memorial 44 requests that RETA identify and prioritize the best viable options for potential transmission corridors to accommodate renewable energy export from New Mexico in accordance with a defined time-line and to convene a working group to submit recommendations to the legislature for establishing a process to streamline procedures for establishing renewable energy transmission projects in New Mexico. RETA's July 9, 2009 request for comments outlined seven topical areas of specific value to Senate Memorial 44. This document addresses Topics 1, 3 and 4.

Toole, Gasper Loren [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

111

Introduction Uniform Estimates for Transmission Problems 3D Multiscaled Asymptotic Expansion Numerical Simulations Skin-Effect Description in Electromagnetism with a  

E-Print Network [OSTI]

Numerical Simulations Skin-Effect Description in Electromagnetism with a Scaled Asymptotic Expansion Gabriel.08.2009 V. P´eron Skin-Effect Description in Electromagnetism with a Scaled Asymptotic Expansion 1 / 32 and Electromagnetism MONIQUE DAUGE, ERWAN FAOU, VICTOR P ´ERON (2009) Asymptotic Behavior at High Conductivity of Skin

Paris-Sud XI, Université de

112

1406 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 4, NOVEMBER 2007 Market-Based Coordination of Transmission  

E-Print Network [OSTI]

with competitive generation capacity planning in electricity markets. The purpose of the model is a holistic simulation of generation and transmission capacity expansion in the market environment. The solution a joint energy and transmission auction market and a capacity mechanism. The joint auction market enables

Fu, Yong

113

Electric Transmission and Distribution Future R&D Needs Planning, Operation, Control, and Visualization  

Broader source: Energy.gov (indexed) [DOE]

27-28, 2013 27-28, 2013 Washington, DC FY13 DOE/CERTS Transmission Reliability R&D Internal Program Review Research Projects Reliability Standards Analysis and Assessments  Frequency Response Event Collection and Analysis  NERC Interconnections 2012 Annual Grid Reliability Performance Analysis and Report Page 1 Reliability Standards Analysis and Assessment  Objective: Collect grid data and conduct grid reliability performance analysis to support the NERC committees/groups (Resources Subcommittee and RS- Frequency Working Group) in the following ways: - Perform grid reliability metrics analysis using data collected in CERTS applications as requested by the RS - Analyze collected data to assess reliability performance at different levels - Interconnection, Reliability Coordinator, Balancing Authority

114

Transmission | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

115

Comments from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages  

Broader source: Energy.gov (indexed) [DOE]

COMMONWEALTH of VIRGINIA COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY Street address: 629 East Main Street, Richmond, Virginia 23219 Mailing address: P.O. Box 10009, Richmond, Virginia 23240 Fax (804) 698-4500 TDD (804) 698-4021 www.deq.virginia.gov W. Tayloe Murphy, Jr. Secretary of Natural Resources Robert G. Burnley Director (804) 698-4000 1-800-592-5482 January 5, 2006 The Honorable Samuel W. Bodman Secretary of Energy United States Department of Energy 1000 Independence Avenue, S.W. Washington, D.C. 20585 Re: District of Columbia Public Service Commission Docket No. EO-05-01 Dear Secretary Bodman: The Virginia Department of Environmental Quality (DEQ) strongly opposes the Potomac Electric Power Company's (PEPCO) intention to commence planned maintenance outages of the

116

Regional Transmission Projects: Finding Solutions  

SciTech Connect (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

117

VI Symposium of Specialists in Electric Operational and Expansion Planning -VI SEPOPE, May 24-29,1998, Bahia, Brazil POWER SYSTEM PLANNING IN THE SOUTH AMERICA  

E-Print Network [OSTI]

the execution of a few macro projects, capital intensive, with high impact on the economic development of each country, and where their revenues depend on the local conditions and the development of future projects in infrastructure development and the required regulations in the energy field. It describes how the planning

Catholic University of Chile (Universidad Católica de Chile)

118

Modelling locational price spreads in competitive electricity markets; applications for transmission rights valuation and replication  

Science Journals Connector (OSTI)

......historical data to calibrate...training data can make...capacity of the transmission line, in megawatts...transmission outages or expansion...training data can make...capacity of the transmission line, in megawatts...transmission outages or expansion......

Petter Skantze; Marija Ilic; Andrej Gubina

2004-10-01T23:59:59.000Z

119

EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Plan  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Westerns Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

120

Eastern Interconnection Planning Collaborative News Release | Department of  

Broader source: Energy.gov (indexed) [DOE]

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 Application to Export Electric Energy OE Docket No. EA-352 NaturEner Tie

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Sustainable resource planning in energy markets  

Science Journals Connector (OSTI)

Abstract This study investigates the role of sustainable energy volatility in a market participants competitive expansion planning problem. The incomplete information non-cooperative game-theoretic method is utilized in which each generation company (GENCO) perceives strategies of other market participants in order to make a decision on its strategic generation capacity expansion. Sustainable generation incentives, carbon emission penalties, and fuel price forecast errors are considered in the strategic decisions. The market clearing process for energy and reserves is simulated by each GENCO for deriving generation expansion decisions. A merit criterion (i.e., the utility value) is proposed for a more realistic calculation of the expected payoff of a GENCO with sustainable energy resources. Finally, the impact of transmission constraints is investigated on the GENCOs expansion planning decision. The case studies illustrate the effectiveness of the proposed method.

Saeed Kamalinia; Mohammad Shahidehpour; Lei Wu

2014-01-01T23:59:59.000Z

122

Current conflicts in U.S. Electric transmission planning, cost allocation and renewable energy policies: More heat than light?  

SciTech Connect (OSTI)

To surmount obstacles to expanding and upgrading the nation's transmission system that are impeding development of the renewables sector, it is critical that these issues be resolved quickly and on a consistent rather than ad hoc basis. (author)

Bloom, David; Forrester, J. Paul; Klugman, Nadav

2010-12-15T23:59:59.000Z

123

Abstract--This paper proposes an optimization based method of planning reactive power control for electric transmission  

E-Print Network [OSTI]

Research under the Electric Power Networks Efficiency and Security (EPNES) program, award ECS0323734. H for electric transmission systems to endow them with the capability of being reconfigured to a secure. The modified New England 39-bus system and a North American power system with 6358 buses are adopted

Kumar, Ratnesh

124

National Transmission Grid Study  

Broader source: Energy.gov (indexed) [DOE]

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

125

Designing electricity transmission auctions  

E-Print Network [OSTI]

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

126

Mitigation Action Plan for the McNary-John Day Transmission Line Project,(DOE/EIS-0332)  

Broader source: Energy.gov (indexed) [DOE]

Measures Adopted Measures Adopted for the McNary-John Day Transmission Line Project Land Use and Recreation Locate towers and roads so as not to disrupt irrigation circles, where possible. Locate structures and roads outside of agricultural fields, orchards, and vineyards, where possible. Coordinate with landowners for farm operations, including plowing, crop dusting, and harvesting. Redesign irrigation equipment and compensate landowner for additional reasonable costs where new right-of-way needs to be acquired. Compensate farmers for crop damage and restore compacted soils. Control weeds around the base of the towers. Keep gates and fences closed and in good repair to contain livestock. Repair damages to access roads caused by or arising out of Bonneville use, leaving roads in good or better

127

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

128

Chapter 4 Transmission Adequacy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

129

Mitigation Action Implementation Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany and Laramie Counties, Wyoming, and Weld County, Colorado  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany, and Laramie Counties, Wyoming, and Weld County, Colorado September 2006 CH-MM and AU-CH Mitigation Action Plan Sept. 2006 1 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Resources for Which the Mitigation Will Be Implemented Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Land use, transportation Construction Contractor Western Maintenance The contractor will limit the movement of crews and equipment to the ROW, including access routes. The contractor will limit movement on the ROW to minimize damage to

130

Federal Register Notice: Plan for Conduct of 2012 Electric Transmissio...  

Energy Savers [EERE]

Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study...

131

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

132

National Transmission Grid Study: 2002  

Broader source: Energy.gov [DOE]

National Transmission Grid Study: The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity...

133

Eastern Interconnection Planning Collaborative News Release  

Broader source: Energy.gov (indexed) [DOE]

1 1 NEWS RELEASE FOR IMMEDIATE RELEASE May 23, 2011 Contact: David Whiteley d.a.whiteley@att.net 314-753-6200 Eastern Interconnection Grid Planning Authorities to Study Set of Stakeholder-Identified Electric System Futures The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). "We have taken a major step forward with the stakeholder-defined specifications for the resource futures to be considered in the macroeconomic analysis in Phase I of the Project. The stakeholders are to be congratulated for their hard work in achieving a

134

Transmission Workshop | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

135

EA-1891: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan EA-1891: Mitigation Action Plan Alvey-Fairview Transmission Line Rebuild Project, Oregon This Mitigation Action Plan (MAP) is part of the Finding of No...

136

Transmission Reliability | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

137

2012 CERTS R&M Peer Review - Summary: Transmission Investment Under Uncertainty - Ben Hobbs  

Broader source: Energy.gov (indexed) [DOE]

Investment Assessment Under Uncertainty about Fuel Prices, Investment Assessment Under Uncertainty about Fuel Prices, Technology, Renewables Penetration and Market Responses using a Multi-Stage Stochastic Model Approach with Recourse (Year 2) Project Lead: Hobbs Co-investigators: Schuler, Zimmerman July 20, 2012 1. Project objective To develop and apply a methodology for evaluating the impact of market, technology, and policy uncertainties upon transmission planning on a regional and multi-decadal time scale. The methodology will integrate transmission capacity expansion decisions and OPF methodologies in a decomposition scheme in order to rigorously capture operational constraints such as security constraints, ramp limitations, and transmission flow limits, as well as longer term investment issues. The methodology would address questions such

138

Open Access Transmission Tariff  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

139

Assumptions to the Annual Energy Outlook 1999 - Natural Gas Transmission  

Gasoline and Diesel Fuel Update (EIA)

The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by obtaining market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. In addition, natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of gas supply options as translated to the represented market “hubs.” The major assumptions used within the NGTDM are grouped into five general categories. They relate to (1) the classification of demand into core and noncore transportation service classes, (2) the pricing of transmission and distribution services, (3) pipeline and storage capacity expansion and utilization, (4) the implementation of recent regulatory reform, and (5) the implementation of provisions of the Climate Change Action Plan (CCAP). A complete listing of NGTDM assumptions and in-depth methodology descriptions are presented in Model Documentation Report: Natural Gas Transmission and Distribution Model of the National Energy Modeling System, DOE/EIA-MO62/1, January 1999.

140

Assumptions to the Annual Energy Outlook 2000 - Natural Gas Transmission  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. In addition, natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of gas supply options as translated to the represented market “hubs.” The major assumptions used within the NGTDM are grouped into five general categories. They relate to (1) the classification of demand into core and noncore transportation service classes, (2) the pricing of transmission and distribution services, (3) pipeline and storage capacity expansion and utilization, (4) the implementation of recent regulatory reform, and (5) the implementation of provisions of the Climate Change Action Plan (CCAP). A complete listing of NGTDM assumptions and in-depth methodology descriptions are presented in Model Documentation: Natural Gas Transmission and Distribution Model of the National Energy Modeling System, Model Documentation 2000, DOE/EIA-M062(2000), January 2000.

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Colorado/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

Colorado/Transmission/Local Regulations Colorado/Transmission/Local Regulations < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Local Siting Process Under state law, Colorado counties and municipalities are given broad authority to plan for and regulate the use of land within their jurisdictions.[1] State statutes give local governments (counties and municipalities) the authorization to; Appoint planning commissions [2] which are required to prepare and adopt master plans or comprehensive plans for physical development within

142

Integrated Energy-Water Planning in the Western and Texas Interconnections  

SciTech Connect (OSTI)

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliability Council of Texas) with western water planners (Western Governors Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.

Vincent Tidwell; John Gasper; Robert Goldstein; Jordan Macknick; Gerald Sehlke; Michael Webber; Mark Wigmosta

2013-07-01T23:59:59.000Z

143

APEX user`s guide - (Argonne production, expansion, and exchange model for electrical systems), version 3.0  

SciTech Connect (OSTI)

This report describes operating procedures and background documentation for the Argonne Production, Expansion, and Exchange Model for Electrical Systems (APEX). This modeling system was developed to provide the U.S. Department of Energy, Division of Fossil Energy, Office of Coal and Electricity with in-house capabilities for addressing policy options that affect electrical utilities. To meet this objective, Argonne National Laboratory developed a menu-driven programming package that enables the user to develop and conduct simulations of production costs, system reliability, spot market network flows, and optimal system capacity expansion. The APEX system consists of three basic simulation components, supported by various databases and data management software. The components include (1) the investigation of Costs and Reliability in Utility Systems (ICARUS) model, (2) the Spot Market Network (SMN) model, and (3) the Production and Capacity Expansion (PACE) model. The ICARUS model provides generating-unit-level production-cost and reliability simulations with explicit recognition of planned and unplanned outages. The SMN model addresses optimal network flows with recognition of marginal costs, wheeling charges, and transmission constraints. The PACE model determines long-term (e.g., longer than 10 years) capacity expansion schedules on the basis of candidate expansion technologies and load growth estimates. In addition, the Automated Data Assembly Package (ADAP) and case management features simplify user-input requirements. The ADAP, ICARUS, and SMN modules are described in detail. The PACE module is expected to be addressed in a future publication.

VanKuiken, J.C.; Veselka, T.D.; Guziel, K.A.; Blodgett, D.W.; Hamilton, S.; Kavicky, J.A.; Koritarov, V.S.; North, M.J.; Novickas, A.A.; Paprockas, K.R. [and others

1994-11-01T23:59:59.000Z

144

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

145

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect (OSTI)

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

146

EIS-0332: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

kilovolt transmission line between Bonneville Power Administration's existing McNary and John Day substations. Mitigation Action Plan for the McNary-John Day Transmission Line...

147

BPA to share costs with PUDs in regional planning project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

transmission planning. They will share the costs of building a 14 million high-voltage transmission line in Central Washington developed through collaborative assessment and...

148

Definition: Transmission Planner | Open Energy Information  

Open Energy Info (EERE)

Planner Planner Jump to: navigation, search Dictionary.png Transmission Planner The entity that develops a long-term (generally one year and beyond) plan for the reliability (adequacy) of the interconnected bulk electric transmission systems within its portion of the Planning Authority Area.[1] Related Terms transmission lines, transmission line, planning authority, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Planner&oldid=502606" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

149

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

150

500 kV transmission line design and fault analysis.  

E-Print Network [OSTI]

??To be able to keep up with energy demands new transmission lines need to be designed and built. Design and planning is a long process (more)

Haskovic, Mensur

2012-01-01T23:59:59.000Z

151

Transmission Policy in the United States  

E-Print Network [OSTI]

Market Design (SMD) proposal. PJMs market rules and transmission pricing, planning and investment policies are reviewed as an articulation of FERCs RTO and SMD visions....

Joskow, Paul

2006-03-14T23:59:59.000Z

152

Executive Forum on Solutions to Transmission Investment  

E-Print Network [OSTI]

d'Hydro-Québec (IREQ) ISO New England Korea Electric Power Research Institute Michigan Electric. Business and Economics Small Groups ........................................................10 B. Planning and Transmission Investment Policy Small Groups ......................10 C. Technology Small Groups

153

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

154

STAFF PAPER A Review of Transmission Losses in  

E-Print Network [OSTI]

Electricity Analysis Office Electricity Supply Analysis Division California Energy Commission and distribution loss values in planning studies. In this effort, staff analyzed data, researched literature STAFF PAPER A Review of Transmission Losses in Planning Studies Lana Wong

155

Magnus expansion generator  

Science Journals Connector (OSTI)

A recursion formula for the Magnus expansion is presented which can be used to deduce higher-order terms and to investigate their properties. The application of this formula is illustrated with several examples which were motivated by NMR spectroscopy.

D. P. Burum

1981-10-01T23:59:59.000Z

156

Energy Planning for Progressive Estimation in Multihop Sensor Networks  

E-Print Network [OSTI]

routing tree establishment, transmission energy plan- ninglarge gap of energy between the single-hop tree and therouting tree finding and the transmis- sion energy planning

Huang, Yi; Hua, Yingbo

2009-01-01T23:59:59.000Z

157

EA-1595: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan EA-1595: Mitigation Action Plan Davis-Mead 230-kV Transmission Line Reconductor Project Western Area Power Administration proposes to reconductor...

158

EIS-0422: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Action Plan EIS-0422: Mitigation Action Plan Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Mitigation measures and estimated time of implementation within...

159

EA-1679: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Action Plan EA-1679: Mitigation Action Plan Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington This MAP is for...

160

Transmission Investment: A Primer  

SciTech Connect (OSTI)

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at...

162

Bibliography on transmission access issues  

SciTech Connect (OSTI)

This paper presents a bibliography on issues related to transmission access in electric power systems. There are 233 citations referenced in this bibliography. This bibliography presents a collection of selected literature on issues related to transmission access. It does not contain all of the material available on this subject or the categories contained herein. Some readers may feel that citations within this bibliography should be strictly limited to transmission system issues and not include energy pricing or reliability issues. However, it was the decision of the Subcommittee of the IEEE Task Force on Transmission Access and Nonutility Generation that selected entries relating to reliability and energy pricing, most relevant to transmission access, should be included. This decision was made because certain issues relating to reliability, transmission and energy pricing are perceived by the industry to be critical in the discussion of transmission access. The bibliography has been divided into the following sections or sub-sections: 2.0 Operational (Engineering) Issues, 3.0 Planning, 4.0 Reliability, 5.1 Economics: Costing, 5.2(a) Economics: Location-Differentiated Pricing, 5.2(b) Economics: Time-Differentiated Pricing, 5.3 Economics: Brokering, Bidding, and Auctioning, 6.0 Regulatory, and 7.0 General. Although the content of many publications spanned two or more of these sections, the desire to limit document length required that all publications be placed in the single most appropriate section. Publications are sorted according to author or publication resource.

Lankford, C.B. [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States)] [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States); McCalley, J.D. [Iowa State Univ., Ames, IA (United States)] [Iowa State Univ., Ames, IA (United States); Saini, N.K. [Entergy Services Corp., Metairie, LA (United States)] [Entergy Services Corp., Metairie, LA (United States)

1996-02-01T23:59:59.000Z

163

Transmission A  

Gasoline and Diesel Fuel Update (EIA)

decreases decreases were related to decreases in electric utility con- sumption in each State and by decreased industrial con- sumption in each of the States except New York. However, all of the States reported significantly increased residential and commercial consumption. In general, increased inter- state movements up the eastern seaboard States helped to meet the overall increased total demand in the middle At- lantic and New England areas. Imports and Exports In 1996, net imports of natural gas rose for the 10th consecutive year, representing almost 13 percent of U.S. gas consumption. Exports remained at nearly the same level as one year ago. Canada continued its role as the major supplier of gas imported into the United States. However, the growth rate of U.S. imports of Canadian gas slowed as pipeline capacity utilization remained near its maximum level and capacity expansion

164

Penn State Engineering Search for 6 Faculty Positions Dean's Frontier Faculty As part of a plan for substantial expansion of the faculty in both core and emerging fields, the Penn  

E-Print Network [OSTI]

and imaging; nanomanufacturing; additive manufacturing; new materials for sustainability and enhanced Advanced Manufacturing for Medical and Mechanical Sciences: bioprinting; biomedical sensing, devices will be determined during the hiring process. Additional information about these positions and the College's plan

Maranas, Costas

165

The Universe Adventure - Expansion  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Expansion: Chunk-by-Chunk Expansion: Chunk-by-Chunk A sample of the Universe. A very small portion of the Universe. In order to better understand the significance of expansion, let's look at a cubic sample of space. By considering a finite volume we can follow changes in the size of the Universe as we move forwards and backwards in time. Remember, only the size of the cube will change. The galaxies inside the cube stay the same size. This animation illustrates how our cubic piece of the Universe changes with time. If the Universe followed the simplest expansionary models, its size would increase linearly with time. The Universe would continue to expand at a constant rate forever. If you look at only a narrow time-slice of the Universe's history, it does, in fact, appear that this is how the Universe

166

Management Plan Management Plan  

E-Print Network [OSTI]

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

167

Optoelectronics 514 Transmission Hologram Transmission Hologram  

E-Print Network [OSTI]

Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

Collins, Gary S.

168

Chemical Plant Expansion  

Science Journals Connector (OSTI)

Despite $4 billion of capital expenditure for plant expansion over the past seven years, a high level of construction activity is expected to continue ... A marked increase in capital expenditures of t h e six largest chemical companies too place in 1951 over 1950. ...

JOHN M. WEISS

1952-06-09T23:59:59.000Z

169

Static gas expansion cooler  

DOE Patents [OSTI]

Disclosed is a cooler for television cameras and other temperature sensitive equipment. The cooler uses compressed gas ehich is accelerated to a high velocity by passing it through flow passageways having nozzle portions which expand the gas. This acceleration and expansion causes the gas to undergo a decrease in temperature thereby cooling the cooler body and adjacent temperature sensitive equipment.

Guzek, J.C.; Lujan, R.A.

1984-01-01T23:59:59.000Z

170

Some operating features of a 100,000-volt transmission  

E-Print Network [OSTI]

of the thesis - - - - - - Page 2. (2) Introductory description of line - - - Page 5* A* Stations in operation, B. Plan and profile of route, C. Mechanical construction. D. Mechanical weakness of line - - - Paige 10. a^ Excessive lengths of spans. b... Superstructure Denver Substation - 7 Profile of the Transmission Line 8a Plan of the Transmission Line - - - - - 8b Transmission Line at Hell Gate - - - - - 11 Sleet on the Argentine Crest Tower 13 Tower Crushed by Snow Slide - - - - - 13 Curve of Sparking...

Jones, Raymond

1914-03-17T23:59:59.000Z

171

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Strategic Plan science-innovationassetsimagesicon-science.jpg Strategic Plan x Strategic Plan Los Alamos National Laboratory Strategic Plan - 2014 (pdf) Our Strategic Plan...

172

EA-1934: Expansion of Active Borrow Areas, Hanford Site, Richland,  

Broader source: Energy.gov (indexed) [DOE]

EA-1934: Expansion of Active Borrow Areas, Hanford Site, Richland, EA-1934: Expansion of Active Borrow Areas, Hanford Site, Richland, Washington EA-1934: Expansion of Active Borrow Areas, Hanford Site, Richland, Washington SUMMARY This EA evaluates the potential environmental impacts of expansion or continued use of existing sand and gravel pits located on the Hanford Site (Pits F, H, N, 6, 9, 18, 21, 23, 24, 30, and 34) and establishing one new borrow area source in the 100 Area for ongoing construction activities and fill material following remediation activities. The scope of this EA does not include borrow sources for silt-loam material. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 15, 2013 EA-1934: Mitigation Action Plan Expansion of Active Borrow Areas, Hanford Site, Richland, Washington

173

EA-1934: Expansion of Active Borrow Areas, Hanford Site, Richland,  

Broader source: Energy.gov (indexed) [DOE]

4: Expansion of Active Borrow Areas, Hanford Site, Richland, 4: Expansion of Active Borrow Areas, Hanford Site, Richland, Washington EA-1934: Expansion of Active Borrow Areas, Hanford Site, Richland, Washington SUMMARY This EA evaluates the potential environmental impacts of expansion or continued use of existing sand and gravel pits located on the Hanford Site (Pits F, H, N, 6, 9, 18, 21, 23, 24, 30, and 34) and establishing one new borrow area source in the 100 Area for ongoing construction activities and fill material following remediation activities. The scope of this EA does not include borrow sources for silt-loam material. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 15, 2013 EA-1934: Mitigation Action Plan Expansion of Active Borrow Areas, Hanford Site, Richland, Washington

174

Recovery Act Interconnection Transmission Planning | Department...  

Office of Environmental Management (EM)

integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the...

175

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

176

SUMMARY PLAN DESCRIPTION Plan Name: MCWAH Vision Plan [Plan # 505  

E-Print Network [OSTI]

to pay for such coverage. Review this summary plan description and the documents governing the planSUMMARY PLAN DESCRIPTION Plan Name: MCWAH Vision Plan [Plan # 505] Plan Type: Group Vision Insurance Plan Year: July 1 ­ June 30 Employer\\Policyholder\\Plan Administrator\\Plan Sponsor: Medical College

177

Wyoming/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Wyoming/Transmission < Wyoming Jump to: navigation, search WyomingTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Wyoming is part of the WestConnect Transmission Planning area, and covers the southwest of the United States. Within the WestConnect system, Wyoming is part of the Colorado Coordinated Planning Group (CCPG) power grid that covers Colorado and portions of Wyoming.

178

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

179

Jeff Lab director plans retirement (Daily Press) | Jefferson...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Jefferson Science Associates chairman - praised Leemann's leadership during the transition to a new management contract last year and on the expansion plans. "This...

180

Inhomogeneity implies accelerated expansion  

Science Journals Connector (OSTI)

The Einstein equations for an inhomogeneous irrotational dust universe are analyzed. A set of mild assumptions, all of which are shared by the standard Friedmann-Lemaitre-Robertson-Walkertype scenarios, results in a model that depends only on the distribution of scalar spatial curvature. If the shape of this distribution is made to fit the structure of the present Universe, with most of the matter in galaxy clusters and very little in the voids that will eventually dominate the volume, then there is a period of accelerated expansion after cluster formation, even in the absence of a cosmological constant.

Harald Skarke

2014-02-10T23:59:59.000Z

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Load regulating expansion fixture  

DOE Patents [OSTI]

A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils is disclosed. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components. 1 fig.

Wagner, L.M.; Strum, M.J.

1998-12-15T23:59:59.000Z

182

Load regulating expansion fixture  

DOE Patents [OSTI]

A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components.

Wagner, Lawrence M. (San Jose, CA); Strum, Michael J. (San Jose, CA)

1998-01-01T23:59:59.000Z

183

Topic A Awardee: Eastern Interconnection Planning Collaborative |  

Broader source: Energy.gov (indexed) [DOE]

A Awardee: Eastern Interconnection Planning A Awardee: Eastern Interconnection Planning Collaborative Topic A Awardee: Eastern Interconnection Planning Collaborative Eastern Interconnection Planning Collaborative The Eastern Interconnection Planning Collaborative (EIPC) was initiated by a coalition of regional Planning Authorities. These Planning Authorities are entities listed on the NERC compliance registry as Planning Authorities and represent the entire Eastern Interconnection. The EIPC was founded to be a broad-based, transparent collaborative process among all interested stakeholders: State and Federal policy makers Consumer and environmental interests Transmission Planning Authorities Market participants generating, transmitting or consuming electricity within the Eastern Interconnection. The EIPC will provide a grass-roots approach which builds upon the regional

184

Electric utility system master plan  

SciTech Connect (OSTI)

This publication contains the electric utility system plan and guidelines for providing adequate electric power to the various facilities of Lawrence Livermore National Laboratory in support of the mission of the Laboratory. The topics of the publication include general information on the current systems and their operation, a planning analysis for current and future growth in energy demand, proposed improvements and expansions required to meet long range site development and the site`s five-year plan.

Erickson, O.M.

1992-10-01T23:59:59.000Z

185

The early planning and development of Oklahoma City  

E-Print Network [OSTI]

An analysis of the planning, development, and implementation of Oklahoma City's Grand Boulevard. In the early days of 1909, a plan emerged to build an expansive parks and boulevard system to encircle Oklahoma City. Such ...

Humphreys, Blair D. (Blair David)

2009-01-01T23:59:59.000Z

186

Dissipative expansion chambers with two concentric layers of fibrous material  

Science Journals Connector (OSTI)

The acoustic performance of a dissipative expansion chamber lined with two concentric, annular layers of fibrous material with different resistances is investigated. A two-dimensional analytical approach is used to determine the transmission loss of this dissipative silencer. From the boundary conditions at the rigid wall, and the interfaces between the fibre layers and the central airway, the characteristic function and thus eigenvalues and eigenfunctions for sound propagation in the dissipative chamber are obtained, leading to transmission loss through application of pressure and velocity matching. The effects of geometry and fibre properties on the acoustic attenuation are also discussed.

A. Selamet; M.B. Xu; I.J. Lee; N.T. Huff

2005-01-01T23:59:59.000Z

187

Thermal Expansion of Confined Water  

Science Journals Connector (OSTI)

Typical results for expansion measurements on the bulk liquid, reported in ref 3, agreed with the handbook values with errors DOE Contract DEFG 02-97ER45642. ...

Shuangyan Xu; George W. Scherer; T. S. Mahadevan; Stephen H. Garofalini

2009-03-10T23:59:59.000Z

188

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

189

Colorado/Transmission/Regulatory Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission Regulatory Roadmap Roadmap State Data Regulatory Overview General TOOLS Regulatory Roadmap Regulatory Wizard Best Practices Document Library NEPA Database Glossary TECHNOLOGIES Geothermal Solar Water Wind TOPICS Land Use Planning Land Access Exploration Well Field Power Plant Transmission Water Rights Environment The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart

190

Microsoft Word - CX_DeMoss_Substation_Expansion_130531  

Broader source: Energy.gov (indexed) [DOE]

Alaric Hsu Alaric Hsu Project Manager - TEP-CSB-2 Proposed Action: De Moss Substation Expansion Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Sherman County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to expand its De Moss Substation yard located in Sherman County, Oregon. The expansion is necessary to install additional reactors that would provide the necessary reactive support to address the extreme high voltage at De Moss Substation resulting from the loss of the Big Eddy - DeMoss transmission line during winter peak conditions. The equipment at De Moss Substation is currently sustaining voltage

191

May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission  

Broader source: Energy.gov (indexed) [DOE]

May 29 Tribal Renewable Energy Webinar to Highlight Regional May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 24, 2013 - 3:41pm Addthis The U.S. Department of Energy Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series webinar, "Regional Transmission Planning," on Wednesday, May 29, 2013, from 1:00 p.m. to 2:30 p.m. Eastern Time. Speakers from WAPA's Rocky Mountain Region, its Upper Great Plains Region, and WestConnect will provide an overview of various interconnection-based regional transmission planning efforts. Helpful background information on

192

May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission  

Broader source: Energy.gov (indexed) [DOE]

May 29 Tribal Renewable Energy Webinar to Highlight Regional May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 24, 2013 - 3:41pm Addthis The U.S. Department of Energy Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series webinar, "Regional Transmission Planning," on Wednesday, May 29, 2013, from 1:00 p.m. to 2:30 p.m. Eastern Time. Speakers from WAPA's Rocky Mountain Region, its Upper Great Plains Region, and WestConnect will provide an overview of various interconnection-based regional transmission planning efforts. Helpful background information on

193

2009 National Electric Transmission Congestion Study Workshops | Department  

Broader source: Energy.gov (indexed) [DOE]

Services » Technology Development » Transmission Planning » Services » Technology Development » Transmission Planning » Congestion Studies » 2009 Congestion Study » 2009 National Electric Transmission Congestion Study Workshops 2009 National Electric Transmission Congestion Study Workshops DOE hosted six regional pre-study workshops in mid-2008 to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study, including comments on practical metrics for gauging levels and significance of transmission congestion. Each workshop featured a panel of invited speakers to present their views and comments. For details, including agendas, transcripts, and documents submitted for consideration for the 2009 study, please select a workshop, below. June 11, 2008 San Francisco, CA June 18, 2008 Oklahoma City, OK

194

EIS-0231: Navajo Transmission Project | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31: Navajo Transmission Project 31: Navajo Transmission Project EIS-0231: Navajo Transmission Project SUMMARY This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 1, 1996 EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project

195

EIS-0404: Los Vaqueros Reservoir Expansion Project, California | Department  

Broader source: Energy.gov (indexed) [DOE]

404: Los Vaqueros Reservoir Expansion Project, California 404: Los Vaqueros Reservoir Expansion Project, California EIS-0404: Los Vaqueros Reservoir Expansion Project, California Summary This EIS/Environmental Impact Report was prepared by the Department of the Interior (Bureau of Reclamation, Mid-Pacific Region) and the Contra Costa Water District to evaluate the environmental impacts of a proposal to enlarge the existing Los Vaqueros Reservoir in Contra Costa County, California. DOE's Western Area Power Administration (Western) was a cooperating agency because it has jurisdiction over transmission facilities that were expected to be relocated under the proposed action. Based on project changes, however, Western has no action and therefore will not adopt the EIS or issue a ROD. Public Comment Opportunities No public comment opportunities available at this time.

196

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

197

Transmission Utilization Group (TUG)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Intertie Initiatives Intertie Open Season Transmission Utilization...

198

Transmission Commercial Project Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

199

Underground Power Transmission  

Science Journals Connector (OSTI)

...The type of transmission line for a particular...will force rt transmission lines to be ground near...history of power transmission shows that d-c...characteristics of a d-c line, it is easy to...Best data fit III II I...

P. H. Rose

1970-10-16T23:59:59.000Z

200

EIS-0332: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

kV transmission line between Bonneville Power Administration's existing McNary and John Day substations. DOEEIS-0332: Mitigation Action Plan for the McNary-John Day Transmission...

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

> PAPER FOR THE SPECIAL SECTION ON TRANSMISSION INVESTMENT, PRICING AND CONSTRUCTION < 1 Abstract--From an economic perspective, the appropriate  

E-Print Network [OSTI]

a multi-stage game-theoretic framework for electricity transmission investment as a new planning paradigm and the impact of transmission on spot energy prices. We formulate transmission planning as an optimization may be used to distribute the social gains among all market players. In reality, however, since

202

Vice President, Transmission Marketing & Sales  

Broader source: Energy.gov [DOE]

Within Transmission Services at Bonneville Power Administration (BPA), Transmission Marketing and Sales (TS) provides open access to the Federal Transmission System (FTS) consistent with...

203

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

204

Business plan proposal  

E-Print Network [OSTI]

about you and your business. The following guideline has been provided to ensure that important points are included in the executive summary. Your business may believe that other information may be pertinent to the completion of the agribusiness plan..., partnership, corporation), if it is a merchandising, processing, or service related business. Is it a new business? an expansion? or a relocation? If it is a relocation, where are you currently located? Trace the history of your business: when was it formed...

Kucera, Carolyn

1991-01-01T23:59:59.000Z

205

Idaho/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Local Regulations Idaho/Transmission/Local Regulations < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Local Siting Process The typical siting process for a transmission line in Idaho will fall to the local units of government in the form of local siting permits, because NIETCs are lacking within Idaho. Chapter 65, Title 67 of Idaho Code extends authority to the counties to include transmission corridors in their comprehensive plans and provides ordinance authority and processes for granting such permits. When the siting process falls to the county level,

206

Crossroads Expansion | Open Energy Information  

Open Energy Info (EERE)

Expansion Expansion Jump to: navigation, search Name Crossroads Expansion Facility Crossroads Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Oklahoma Gas & Electric Developer RES Americas Energy Purchaser Oklahoma Gas & Electric Coordinates 36.021°, -98.667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.021,"lon":-98.667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

207

Clocking the Early Universe's Expansion  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Expansion Calculations Performed at NERSC Help Scientists Close in on the Nature of Dark Energy April 17, 2014 Margie Wylie, mwylie@lbl.gov, +1 510 486 7421 NERSC PI: David...

208

Thermal expansion of SOFC materials  

Science Journals Connector (OSTI)

A short overview is given for the thermal expansion of solid oxide fuel cell materials. The thermomechanical compatibility of state-of-the-art materials is compared with alternative, new materials. With these ...

F. Tietz

1999-01-01T23:59:59.000Z

209

Workshop title: Transmission and Utility Scale Solar Opportunities "South of Phoenix" (or should we say "in Arizona" if we inc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Purpose: A stakeholder communication with transmission customers, Tribes, developers, state Purpose: A stakeholder communication with transmission customers, Tribes, developers, state and federal agencies, and utilities about Western Area Power Administration's (Western) Rocky Mountain Region (RMR) and its Transmission Planning and Business Unit. The workshop will provide an overview of Western RMR's transmission planning and services and provide an opportunity for open discussion on overcoming transmission challenges in the region. The workshop will also meet the local transmission planning process requirements for FERC Order 890 as outlined in Western's Open Access Transmission Tariff.

210

OMV studies ethylene expansion in Germany  

SciTech Connect (OSTI)

OMV(Vienna) is evaluating plans to debottleneck its ethylene plant at Burghausen from 310,000 m.t./year to at least 400,000 m.t./year. Senior v.p. Jochen Berger says OMV is studying the limits to which the cracker can be expanded. {open_quotes}We`re pretty sure we can go to 400,000 m.t./year, but in two months we`ll have a better idea,{close_quotes} says Berger. The expansion will also depend on the future requirements of downstream operations at the Burghausen site, which include OMV plastics subsidiary PCD`s high-density polyethylene and polypropylene units and the vinyl chloride monomer and polyvinyl chloride units operated by Hoechst-Wacker joint venture Vinnolit.

NONE

1996-10-23T23:59:59.000Z

211

EC Transmission Line Risk Identification and Analysis  

SciTech Connect (OSTI)

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

212

2012 National Electric Transmission Congestion Study Workshops | Department  

Broader source: Energy.gov (indexed) [DOE]

Transmission Planning » Transmission Planning » Congestion Studies » 2012 National Electric Transmission Congestion Study Workshops 2012 National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. For details, please select a workshop, below. Agendas, presentations, and transcripts are available on the individual workshop pages; please select a workshop from the list below. Note: The November 10, 2011 Federal Register notice incorrectly stated that the four regional workshops would be simulcast over the Internet and that advanced registration for the Webcasts was required. The workshops were not simulcast. The Department requested, but did not require, those who

213

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

214

Stream Control Transmission Protocol  

Science Journals Connector (OSTI)

This document describes the Stream Control Transmission Protocol (SCTP). SCTP is designed to transport PSTN signaling messages over IP networks, but is capable of broader applications.

R. Stewart; Q. Xie; K. Morneault; C. Sharp; H. Schwarzbauer; T. Taylor; I. Rytina; M. Kalla; L. Zhang; V. Paxson

2000-10-01T23:59:59.000Z

215

Transmission Design at the National Level: Benefits, Risks and Possible Paths Forward  

E-Print Network [OSTI]

Electric Energy System #12;Transmission Design at the National Level: Benefits, Risks and Possible Paths of Transmission and Distribution, Southern Company Brad Nickell, Director of Transmission Planning, Western interconnection consisting of one (in the case of ERCOT) or more regions. The ability to move electric energy

216

Adapting the Transmission Reach in Mixed Line Rates WDM Transport Networks  

E-Print Network [OSTI]

Adapting the Transmission Reach in Mixed Line Rates WDM Transport Networks K. Christodoulopoulos, K to support the transmission at different line rates. Previously proposed planning algorithms, have used a transmission reach limit for each modulation format/line rate, mainly driven by single line rate systems

Varvarigo, Emmanouel "Manos"

217

Transmission Line Security Monitor  

SciTech Connect (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

218

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

219

127 Natural Gas Transmission and Distribution Module  

E-Print Network [OSTI]

and border prices, end-use prices, and flows of natural gas through a regional interstate representative pipeline network, for both a peak (December through March) and off-peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of the supply options available to bring gas to market centers within each of the NGTDM regions (Figure 9). The major assumptions used within the NGTDM are grouped into four general categories. They relate to (1) structural components of the model, (2) capacity expansion and pricing of transmission and distribution services, (3) Arctic pipelines, and (4) imports and exports. A complete listing of NGTDM assumptions and in-depth

Key Assumptions

220

E-Print Network 3.0 - agriculture planning part Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Science, University of Lethbridge Collection: Mathematics 72 Sharpening the Focus of Yolo County Land Use Policy Summary: plans for urban expansion while maintaining land in...

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Targeting DSM for transmission and distributions benefits: A case study of PG E's Delta District  

SciTech Connect (OSTI)

This study describes the results of evaluating the impact of a variety of DSM programs on the capacity expansion plan of an actual distribution planning area in Pacific Gas and Electric Company's service territory. The study makes use of a number of new techniques to develop area specific marginal costs, loads and DSM load impacts. The detailed data is used to develop an integrated least-cost distribution plan for the area. The integrated plan is approximately 30 percent less expansive than the unintegrated distribution expansion plan. PG E is among a number of utilities that are now beginning to work on increasing the cost-effectiveness of DSM programs with the use of integrated T D planning. Most of these utilities are experiencing higher T D costs relative to their costs of generation.

Orans, R.; Woo, C.K.; Swisher, J.N. (Energy and Environmental Economics, San Francisco, CA (United States)); Wiersma, B.: Horii, B. (Pacific Gas and Electric Co., San Francisco, CA (United States))

1992-05-01T23:59:59.000Z

222

Definition: Advanced Transmission Applications | Open Energy Information  

Open Energy Info (EERE)

Applications Applications Jump to: navigation, search Dictionary.png Advanced Transmission Applications Software that utilizes synchrophasor information for real-time grid operations or planning and off-line analysis. These applications are aimed at providing wide-area situational awareness, grid monitoring, and detailed power system analysis and the improvement or validation of power system models.[1] Related Terms smart grid References ↑ https://www.smartgrid.gov/category/technology/advanced_transmission_applications [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitionssustainability, |Template:BASEPAGENAME]]sustainability, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Advanced_Transmission_Applications&oldid=502495

223

EIS-0474: Southline Transmission Project, Arizona and New Mexico |  

Broader source: Energy.gov (indexed) [DOE]

4: Southline Transmission Project, Arizona and New Mexico 4: Southline Transmission Project, Arizona and New Mexico EIS-0474: Southline Transmission Project, Arizona and New Mexico Summary The Department of the Interior's Bureau of Land Management (BLM) and Department of Energy's Western Area Power Administration (Western) are preparing this EIS as joint lead agencies to evaluate the environmental impacts of the proposed Southline Transmission Project and address associated potential land use plan amendments. The project would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing transmission lines between the Apache and Saguaro, Arizona substations. Project website: http://www.blm.gov/nm/southline.

224

Microsoft Word - PearlSubExpansion_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

3, 2012 3, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Johny Luiz - TEP-CSB-2 Proposed Action: Pearl Substation 500-kilovolt (kV) #6 Bay Addition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Clackamas County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The proposed project includes modification of existing substation equipment, the addition of a new 500-kV Bay 6, and a one-half acre yard expansion in the southwest corner of the substation. The yard expansion area is within BPA property, consists of mowed grass, and is to facilitate a 40 square foot addition to the Pearl Control House

225

ACQUISITION PLANNING  

Office of Environmental Management (EM)

PLANNING Guiding Principles Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory,...

226

STRATEGIC PLAN  

Energy Savers [EERE]

STRATEGIC PLAN 2015 - 2018 Message from the Associate Under Secretary for Environment, Health, Safety and Security I am proud to introduce this strategic plan for the Office of...

227

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

228

Integrated Transmission and Distribution Control  

SciTech Connect (OSTI)

Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: Develop a simulation environment for integrating transmission and distribution control, Construct reduced-order controllable models for smart grid assets at the distribution level, Design and validate closed-loop control strategies for distributed smart grid assets, and Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

2013-01-16T23:59:59.000Z

229

Transmission Access Resources  

Broader source: Energy.gov [DOE]

Historically, the addition of new electric generation facilities has been accompanied by new transmission systems. For example, large nuclear and coal plants built in the 1960s and 1970s required...

230

Performance Incentives for Transmission  

E-Print Network [OSTI]

The Federal Energy Regulatory Commission's Standard Market Design Notice of Public Rule- making (SMD NOPRPerformance Incentives for Transmission FERC's Standard Market Design should accommodate of California at Berkeley. The research described in this article was supported by National Grid, USA

Oren, Shmuel S.

231

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

232

Audio Transmission Systems  

Science Journals Connector (OSTI)

Audio transmission systems are the means by which audio signals are routed, processed, and assigned to the desired monitor and recording output channels. In the early days of electrical recording, rarely more ...

John Eargle

1986-01-01T23:59:59.000Z

233

Transmission Grid Integration  

Broader source: Energy.gov [DOE]

The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

234

Honda Transmission Technical Center  

High Performance Buildings Database

Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

235

Transmission/Resource Library/GIS Tools | Open Energy Information  

Open Energy Info (EERE)

Transmission/Resource Library/GIS Tools Transmission/Resource Library/GIS Tools < Transmission‎ | Resource Library Jump to: navigation, search ResourceLibraryHeader.png Planning Public Involvement GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database ACEII.jpg ACE-II: Areas of Conservation Emphasis Provides an easily-accessible and standardized way to view the best available statewide data on California's biological richness and biodiversity CAPS.jpg CAPS: Crucial Areas Planning System Online tool that maps crucial habitat as well as key wildlife connectivity areas in Montana. The aim of the mapping system is to consider fish,

236

Transmission Right Of Way  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

237

Arizona/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

Regulations Regulations < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Local Siting Process A CEC granted by the TLSC must be in compliance with all applicable ordinances, master plans and regulations of the state, a county or an incorporated city or town in which a facility will be located.[1] [This is subject to the power to grant a CEC "notwithstanding any such ordinance, master plan or regulation, exclusive of franchises, if the committee finds as a fact that compliance with such ordinance, master plan or regulation is

238

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

Agencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary General Transmission...

239

National Electric Transmission Congestion Study Webinars | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

240

EA-1508: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

508: Mitigation Action Plan 508: Mitigation Action Plan EA-1508: Mitigation Action Plan Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado This is the mitigation action plan (MAP) for use during construction of the Beaver Creek-Hoyt-Erie transmission line upgrades, including right-of ways (ROWS), hydrology, vegetation, construction debris and dewatering, landscape engineering, borrow pits and recommended procedures for Raptors and powerline construction. Mitigation Action Plan to Implement Mitigation Requirements for Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado November 2005 More Documents & Publications EA-1617: Mitigation Action Plan EA-1456: Mitigation Action Plan EA-1611: Mitigation Action Plan

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Electricity Transmission, A Primer | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

242

Cosmic antifriction and accelerated expansion  

Science Journals Connector (OSTI)

We explain an accelerated expansion of the present Universe, suggested from observations of supernovae of type Ia at high redshift, by introducing an antifrictional force that is self-consistently exerted on the particles of the cosmic substratum. Cosmic antifriction, which is intimately related to particle production, is shown to give rise to an effective negative pressure of the cosmic medium. While other explanations for an accelerated expansion (cosmological constant, quintessence) introduce a component of dark energy in addition to standard cold dark matter (CDM) we resort to a phenomenological one-component model of CDM with internal self-interactions. We demonstrate how the dynamics of the cold dark matter model with a cosmological constant may be recovered as a special case of cosmic antifriction. We discuss the connection with two-component models and obtain an attractor behavior for the ratio of the energy densities of both components which provides a possible phenomenological solution to the coincidence problem.

Winfried Zimdahl; Dominik J. Schwarz; Alexander B. Balakin; Diego Pavn

2001-08-03T23:59:59.000Z

243

EA-1591: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

91: Mitigation Action Plan 91: Mitigation Action Plan EA-1591: Mitigation Action Plan Palisades-Goshen Transmission Line Reconstruction Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Palisades-Goshen Transmission Line Reconstruction Project. The project involves reconstruction of the existing Palisades-Goshen 115-kV transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. Mitigation Action Plan for the Palisades-Goshen Transmission Line Reconstruction Project More Documents & Publications EA-1591: Final Environmental Assessment, Finding of No Significant Impact, and Mitigation Action Plan EA-1591: Finding of No Significant Impact

244

Hybrid Transmission Corridor study  

SciTech Connect (OSTI)

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

245

1/N expansion in noncommutative quantum mechanics  

SciTech Connect (OSTI)

We study the 1/N expansion in noncommutative quantum mechanics for the anharmonic and Coulombian potentials. The expansion for the anharmonic oscillator presented good convergence properties, but for the Coulombian potential, we found a divergent large N expansion when using the usual noncommutative generalization of the potential. We proposed a modified version of the noncommutative Coulombian potential which provides a well-behaved 1/N expansion.

Ferrari, A. F. [Universidade Federal do ABC, Centro de Ciencias Naturais e Humanas, Rua Santa Adelia, 166, 09210-170, Santo Andre, SP (Brazil); Gomes, M.; Stechhahn, C. A. [Instituto de Fisica, Universidade de Sao Paulo, Caixa Postal 66318, 05315-970, Sao Paulo - SP (Brazil)

2010-08-15T23:59:59.000Z

246

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

247

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

248

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

249

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

250

Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.  

SciTech Connect (OSTI)

For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA`s Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

United States. Bonneville Power Administration. Office of Engineering.

1992-05-01T23:59:59.000Z

251

Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.  

SciTech Connect (OSTI)

For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA's Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

United States. Bonneville Power Administration. Office of Engineering.

1992-05-01T23:59:59.000Z

252

Electric Utility Strategic Planning at the PUCT: An Overview  

E-Print Network [OSTI]

the sponsorship of the Electric Power Research Institute (EPRI). Both econometric and end-use models rely upon forecasts of economic and demographic factors. Since such projections are cOllllllonly not available at the appropriate geographical level... Regulatory Research Institute's (NRRI) Capacity Expansion and Reliability Evaluation System (CERES) was implemented for the HL&P system. There are also plans to experiment with EPRI's Electric Generation Expansion Planning (EGEAS) model in the future...

Zarnikau, J.

253

Indian Policy and Westward Expansion  

E-Print Network [OSTI]

Transition in Indian Policy, 1840-48 85 First settlements in OregonOregon Trail, roads and military- postsSanta F Trail and the southwestern commercePur chase of right of way for Oregon Trail recommendedOrgani zation of Oregon and Nebraska proposed...Effect on Indian policy. Development of the Four Great Factors, 1848-5J? 40 Westward Expansion and Settlement of the Pacific Coast 41 Summary o early periodPopulation when organizedOregon emigration after 1848California emigration after 1848Re lation...

Malin, James Claude

1921-11-01T23:59:59.000Z

254

Transmission SEAB Presentation  

Broader source: Energy.gov (indexed) [DOE]

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

255

Continuously variable transmission  

SciTech Connect (OSTI)

This patent describes a power transmission apparatus. It comprises: a body, a pinion gear, a cam means, first and second gear rack pairs, preventing means;l first and second rack support means, a rotor mounted for rotation about a rotor axis, the rotor having rotor engaging means for engaging the rack support means so as to transmit power therebetween.

Irvin, P.J.E.

1992-07-14T23:59:59.000Z

256

Autonomous data transmission apparatus  

DOE Patents [OSTI]

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

257

Borehole data transmission apparatus  

DOE Patents [OSTI]

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

258

Reinforcing Power Grid Transmission with FACTS Devices  

E-Print Network [OSTI]

We explore optimization methods for planning the placement, sizing and operations of Flexible Alternating Current Transmission System (FACTS) devices installed into the grid to relieve congestion created by load growth or fluctuations of intermittent renewable generation. We limit our selection of FACTS devices to those that can be represented by modification of the inductance of the transmission lines. Our master optimization problem minimizes the $l_1$ norm of the FACTS-associated inductance correction subject to constraints enforcing that no line of the system exceeds its thermal limit. We develop off-line heuristics that reduce this non-convex optimization to a succession of Linear Programs (LP) where at each step the constraints are linearized analytically around the current operating point. The algorithm is accelerated further with a version of the cutting plane method greatly reducing the number of active constraints during the optimization, while checking feasibility of the non-active constraints post...

Frolov, Vladimir; Chertkov, Misha

2013-01-01T23:59:59.000Z

259

Image processing application maps optimal transmission routes  

SciTech Connect (OSTI)

The process of selecting an optimal route for a transmission line is complex as it involves technical, social, economic, environmental, and planning aspects. A new method was developed to help engineers select routes of specific transmission lines. The methodology is based on the use of satellite images of the geographic region in which the line will cross. The selection process searches for the most economical alternative and the one with the least environmental impact within the area of concern. This is achieved by using an image recognition software package and a program that uses minimal path techniques with support of weight restrictions. This article defines the methodology and uses a region of Mexico as an example to illustrate the optimal route-selection process.

Vega, M.; Sarmiento, H.G.

1996-04-01T23:59:59.000Z

260

Hoechst plans Mexican unit  

SciTech Connect (OSTI)

Hoechst is considering plans to build its first ethoxylates project in Mexico, Mark Sijthoff, head of surfactants and auxiliaries for Hoechst`s specialty chemical business unit, tells CW. The company expects to make a decision on the 30,000-m.t./year project by the end of the year. Sijthoff would not disclose the site or where ethylene oxide (EO) feed would be obtained. The plan may depend on results of the privatization of Petroleos Mexicanos (Pemex), which is the only producer of EO in Mexico. Hoechst is part of a consortium bidding on the privatization. Sources say the unit will be built at Quimica Hoechst`s Coatzacoalcos site, close to Pemex`s EO plants at Cangregera and Morelos. A planned EO expansion at Morelos will probably move ahead when the sell-off is completed. Sijthoff says that Hoechst is also looking at improving its US surfactants position, although the company has no plans to expand ethoxylates, as there is {open_quotes}plenty of capacity.{close_quotes} Hoechst started up a 150-million lbs/year plant at Clear Lake, TX last year, ending a tolling agreement with Union Carbide. In addition, Rhone-Poulenc recently started a unit at Marcus Hook, PA, and Condea Vista is doubling its ethoxylation capacity at Lake Charles, LA. Meanwhile, Hoechst is still considering construction of 30,000-m.t./year ethoxylation plant in India or China. A decision is expected later this year.

Wood, A.; Alperowicz, N.

1996-05-22T23:59:59.000Z

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

High thermal expansion, sealing glass  

DOE Patents [OSTI]

A glass composition is described for hermetically sealing to high thermal expansion materials such as aluminum alloys, stainless steels, copper, and copper/beryllium alloys, which includes between about 10 and about 25 mole percent Na[sub 2]O, between about 10 and about 25 mole percent K[sub 2]O, between about 5 and about 15 mole percent Al[sub 2]O[sub 3], between about 35 and about 50 mole percent P[sub 2]O[sub 5] and between about 5 and about 15 mole percent of one of PbO, BaO, and mixtures thereof. The composition, which may also include between 0 and about 5 mole percent Fe[sub 2]O[sub 3] and between 0 and about 10 mole percent B[sub 2]O[sub 3], has a thermal expansion coefficient in a range of between about 160 and 210[times]10[sup [minus]7]/C and a dissolution rate in a range of between about 2[times]10[sup [minus]7] and 2[times]10[sup [minus]9]g/cm[sup 2]-min. This composition is suitable to hermetically seal to metallic electrical components which will be subjected to humid environments over an extended period of time.

Brow, R.K.; Kovacic, L.

1993-11-16T23:59:59.000Z

262

Sixth Northwest Conservation and Electric Power Plan Appendix E: Conservation Supply Curve  

E-Print Network [OSTI]

Sixth Northwest Conservation and Electric Power Plan Appendix E: Conservation Supply Curve....................................................................................................... 11 Value of Energy Saved ............................................................................................................. 11 Value of Deferred Transmission and Distribution Capacity

263

Bureau of Land Management - Examples of Non-LUP Prep Plan or...  

Open Energy Info (EERE)

LandManagement-ExamplesofNon-LUPPrepPlanorEISPrepPlan&oldid793329" Categories: References Geothermal References Solar References Utilities References Bulk Transmission...

264

POLYGALACTURONASE INVOLVED IN EXPANSION1 Functions in Cell Elongation and Flower Development in Arabidopsis  

Science Journals Connector (OSTI)

...might act as downstream components of the regulatory networks that control cell expansion...each genotype) were recorded using a Plan Neofluar 10 0.3-numerical aperture...methylesterase and its proteinaceous inhibitor: a review. Carbohydr. Res. 345 : 2583-2595...

Chaowen Xiao; Chris Somerville; Charles T. Anderson

2014-03-28T23:59:59.000Z

265

Simulated impact of urban expansion on future temperature heatwaves in Sydney  

E-Print Network [OSTI]

on 2-m temperature are investigated over Greater Sydney using the Weather Research and Forecasting (WRF the expected urban expansion in the future simulation according to local government urbanisation plans, are partly explained by the prevalent direction of winds that compensate or intensify the effect urbanisation

Evans, Jason

266

Regulations for Gas Transmission Lines Less than Ten Miles Long (New York)  

Broader source: Energy.gov [DOE]

Any person who wishes to construct a gas transmission line that is less than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of...

267

Transmission Developers Inc.  

Broader source: Energy.gov (indexed) [DOE]

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

268

Transmission Siting_071508.indd  

Broader source: Energy.gov (indexed) [DOE]

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

269

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

270

Patterns of Transmission Investment  

E-Print Network [OSTI]

long term performance contracts with a developer of an HVDC transmission link to expand interconnection capacity between TSOs with no or limited interconnections and with large sustained differences in prices. Merchant investments supported... truly separate AC networks. For example, by building HVDC inter-connectors between two separate networks, opportunities to increase trades of power from high price to low priced areas can be exploited. The HVDC link between the England and France...

Joskow, Paul

2006-03-14T23:59:59.000Z

271

Boardman to Hemingway Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

272

Central Wind Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities: Revised Edition  

SciTech Connect (OSTI)

The report and accompanying table addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America. The first part of the table focuses on electric utilities and regional transmission organizations that have central wind power forecasting in place; the second part focuses on electric utilities and regional transmission organizations that plan to adopt central wind power forecasting in 2010. This is an update of the December 2009 report, NREL/SR-550-46763.

Rogers, J.; Porter, K.

2011-03-01T23:59:59.000Z

273

GENCOs multiperiod expansion model in a competitive electricity market  

Science Journals Connector (OSTI)

Over the past two decades, several countries have restructured their electricity industry by significantly reducing the government's role in the ownership and management of energy sector. The generation sector was the first activity of the vertically integrated industry to be open for the competition and therefore, it presents the highest level of competitiveness and experience. In the new restructured electricity markets, the objective of each generation company (GENCO) is to maximise its total expected profit over a planning horizon while following the grid-code and system operators' directive for the safe operation of the power system. In the expansion plan of generating companies, the problem is to be reformulated incorporating several uncertainty factors such as demand growth, the volatility of market prices for electricity and fuels, delay in project completion, financial constraints, etc. In this paper, a long-term multi-period expansion model for a generation company operating in the deregulated electricity industry is presented. The effectiveness of the proposed approach is demonstrated on numerical examples.

Daniel Hernández-González; Guillermo Gutiérrez-Alcaraz; S.N. Singh

2012-01-01T23:59:59.000Z

274

Transmission Line Circuit Alexander Glasser  

E-Print Network [OSTI]

Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

Anlage, Steven

275

EIS-0128: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

28: Mitigation Action Plan 28: Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos - Gates (Path 15) Transmission Project, Revision 2 Revision 2: This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Electric, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE-0128-MAP-02, Western Area Power Administration, Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project, Revision 2 (December 2003) More Documents & Publications EIS-0128: Mitigation Action Plan EA-1456: Mitigation Action Plan

276

EIS-0128: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

: Mitigation Action Plan : Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos - Gates (Path 15) Transmission Project, Revision 2 Revision 2: This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Electric, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE-0128-MAP-02, Western Area Power Administration, Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project, Revision 2 (December 2003) More Documents & Publications EIS-0128: Mitigation Action Plan EA-1456: Mitigation Action Plan

277

Cosmic Growth History and Expansion History  

E-Print Network [OSTI]

of the expansion history dark energy equation of state,and growth history constraints on the dark energy equationand growth history constraints on the dark energy equation

Linder, Eric V.

2009-01-01T23:59:59.000Z

278

Generation capacity expansion in restructured energy markets.  

E-Print Network [OSTI]

??With a significant number of states in the U.S. and countries around the world trading electricity in restructured markets, a sizeable proportion of capacity expansion (more)

Nanduri, Vishnuteja

2009-01-01T23:59:59.000Z

279

National Electric Transmission Congestion Study 2012 Workshops | Department  

Broader source: Energy.gov (indexed) [DOE]

Transmission Congestion Study 2012 Workshops Transmission Congestion Study 2012 Workshops National Electric Transmission Congestion Study 2012 Workshops DOE will host four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the National Electric Transmission Congestion Study 2012. For details, please see the pdfs, below. Online registration for these workshops is now available. Agendas are available below. Note: The November 10, 2011 Federal Register notice incorrectly stated that the four regional workshops will be simulcast over the Internet and that advanced registration for the Webcasts is required. The workshops will not be simulcast. The Department requests, but does not require, those who are planning to attend the workshops in person to pre-register using the link

280

2012 National Electric Transmission Congestion Study: Presentation from  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study: Presentation National Electric Transmission Congestion Study: Presentation from Congestion Study Webinar Series 2012 National Electric Transmission Congestion Study: Presentation from Congestion Study Webinar Series August 21, 2012 - 12:29pm Addthis The Department is preparing the 2012 Congestion Study now, and is hosting three webinars in August 2012 to receive input and suggestions concerning the preliminary findings of the study. The updated presentation used in the webinars is now available. Addthis Related Articles 2012 Congestion Study Webinars to Present Preliminary Findings and Receive Input from Stakeholders 2012 Congestion Study Workshops to be Held in December; Agendas Now Available Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Task Plans  

Broader source: Energy.gov (indexed) [DOE]

Task Plans Task Plans This page contains links to a tentative listing of active and closed TEC Task Plans. Final status of these task plans will be determined after the July 2000 TEC meeting. Task Plan Number/Title DOE Lead Staff Last Update Comment Status/ New No. After 7/27/00 GP-1, Section 180(c) Coordination (begun 1/96) C. Macaluso 7/98 DOE published a Revised Proposed Policy and Procedures in April 1998; no final policy will be issued until a definitive date for NWPA shipments is determined, based on site suitability or other legislative direction. To the extent that any issues related to Section 180(c) arise in TEC meetings, they are being discussed in the context of the consolidated grant topic group which is covered by another task plan. Closed

282

Transmission/Photo Gallery | Open Energy Information  

Open Energy Info (EERE)

Colorado transmission 2.jpg Bird diverters.jpg Transmission insulators.jpg Retrieved from "http:en.openei.orgwindex.php?titleTransmissionPhotoGallery&oldid687595...

283

Efficiency enhancements for evolutionary capacity planning in distribution grids  

Science Journals Connector (OSTI)

In this paper, we tackle the distribution network expansion planning (DNEP) problem by employing two evolutionary algorithms (EAs): the classical Genetic Algorithm (GA) and a linkage-learning EA, specifically a Gene-pool Optimal Mixing Evolutionary Algorithm ... Keywords: capacity planning, distribution networks, electricity, linkage learning, optimal mixing

Ngoc Hoang Luong; Marinus O.W. Grond; Han La Poutr; Peter A.N. Bosman

2014-07-01T23:59:59.000Z

284

Microsoft Word - Document Numbering Plan.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

document Number Plan 11/3/2005 document Number Plan 11/3/2005 All documents numbers start with a 9 9 _ _ ___ | | | | | Document per chart | Generation (i.e. PSS has 1,2&3, FEEPS has 1&2) Use 0 when the document doesn't apply to any of these System 0- Non system Specific (group wide) 1- PSS 2- Reserved for PSS expansion 3- FEEPS 4- Reserved for FEEPS expansion 5- BLEPS 6- Reserved for BLEPS expansion 7- DIW 8- Reserved for future use 9- Reserved for future use 000-099 Requirements 000 - Statement of work For x.1.4.1.4 - Design Statement of Work For Beamlines - Installation Statement of Work 001-009 Reserved for Statement of Works for upgrade, revisions, add-ons, etc. 010 - Cost Estimate 011-019 Additional Cost Estimates

285

Energy systems planning and GHG-emission control under uncertainty in the province of Liaoning, China A dynamic inexact energy systems optimization model  

Science Journals Connector (OSTI)

Abstract In this study, a dynamic interval-parameter optimization model (DIP-REM) has been developed for supporting long-term energy systems planning in association with GHG mitigation in the region of Liaoning province. The model can describe Liaoning province energy planning systems as networks of a series of energy flows, transferring extracted/imported energy resources to end users through a variety of conversion and transmission technologies over a number of periods and address the problem of GHG-emission reduction within a general energy planning systems framework under uncertainty. Two scenarios (including a reference case) are considered corresponding to different GHG-emission mitigation levels for in-depth analysis of interactions existing among energy, socio-economy and environment in the Liaoning province. Useful solutions for Liaoning province energy planning systems have been generated, reflecting trade-offs among energy-related, environmental and economic considerations. The results can not only provide optimal energy resource/service allocation and capacity-expansion plans, but also help decision-makers identify desired policies for GHG mitigation with a cost-effective manner in the region of Liaoning province. Thus, it can be used by decision makers as an effective technique in examining and visualizing impacts of energy and environmental policies, regional development strategies and emission reduction measures within an integrated and dynamic framework.

J. Liu; Q.G. Lin; G.H. Huang; Q. Wu; H.P. Li

2013-01-01T23:59:59.000Z

286

NREL: Transmission Grid Integration - Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

287

Electric Transmission Line Siting Compact  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

288

Abstract --The growth of non-conventional renewable energies involves a new challenge for optimal network expansion. A better  

E-Print Network [OSTI]

1 Abstract -- The growth of non-conventional renewable energies involves a new challenge for optimal network expansion. A better integration of renewables will be allowed by determining transmission assets necessary for a reliable, affordable and sustainable operation, and even more important

Catholic University of Chile (Universidad Católica de Chile)

289

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network [OSTI]

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

290

Delayed Linear Expansion of Two Ultra-low Expansion Dental Stones  

E-Print Network [OSTI]

The purpose of this study was to measure the linear setting expansion of two ultra-low expansion dental stones used in definitive cast/ prosthesis fabrication which claim to have very low to no setting expansion. Five specimens of each material...

Oppedisano, Michael

2013-12-20T23:59:59.000Z

291

Microsoft Word - Forest Grove Expansion I CX.doc  

Broader source: Energy.gov (indexed) [DOE]

, 2011 , 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Amit Sinha - TEP-CSB-2 Proposed Action: Forest Grove Substation Expansion Budget Information: Work Order # 255319 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B4.6 "Additions or modifications to electric power transmission facilities..." Location: Washington County, OR - Section 32, Township 1 North, Range 3 West of the Forest Grove Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to expand Forest Grove Substation located in Washington County, OR. The purpose of this project is to improve load service and reliability within the Portland vicinity as per the NERC reliability standards. Within the existing Forest Grove Substation, the

292

Multipole Expansion Model in Gravitational Lensing  

E-Print Network [OSTI]

Non-transparent models of multipole expansion model and two point-mass model are analyzed from the catastrophe theory. Singularity behaviours of $2^n$-pole moments are discussed. We apply these models to triple quasar PG1115+080 and compare with the typical transparent model, softened power law spheroids. Multipole expansion model gives the best fit among them.

T. Fukuyama; Y. Kakigi; T. Okamura

1997-01-31T23:59:59.000Z

293

Open Access Transmission Tariff: Effective December 18, 1998 (Revised June 16, 1999).  

SciTech Connect (OSTI)

Bonneville will provide Network Integration Transmission Service pursuant to the terms and conditions contained in this Tariff and Service Agreement. The service that Bonneville will provide under this Tariff allows a Transmission Customer to integrate, economically dispatch and regulate its current and planned Network Resources to serve its Network Load. Network Integration Transmission Service also may be used by the Transmission Customer to deliver nonfirm energy purchases to its Network Load without additional charge. To the extent that the transmission path for moving power from a Network Resource to a Network Load includes the Eastern and Southern Interties, the terms and conditions for service over such intertie facilities are provided under Part 2 of this Tariff. Also, transmission service for third-party sales which are not designated as Network Load will be provided under Bonneville's Point-to-Point Transmission Service (Part 2 of this Tariff).

United States. Bonneville Power Administration.

1999-06-16T23:59:59.000Z

294

Abstract --Under a context of transmission open access, a methodology to define a common transmission trunk system  

E-Print Network [OSTI]

Terms--Transmission systems, Transmission pricing, Cooperative games, Shapley value, Transmission open

Catholic University of Chile (Universidad Católica de Chile)

295

EA-1731: Mitigation Acton Plan | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1: Mitigation Acton Plan 1: Mitigation Acton Plan EA-1731: Mitigation Acton Plan Walla Walla-Tucannon River Transmission Line Rebuild Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Walla Walla-Tucannon River Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves rebuilding the 47-mile-long 115-kilovolt (kV) transmission line from the existing Walla Walla Substation, located in the city of Walla Walla, Washington, to the existing Tucannon River Substation, located near the town of Dayton, Washington. Walla Walla-Tucannon River Transmission Line Rebuild Project, DOE/EA-1731, (May 2011) More Documents & Publications EA-1731: Finding of No Significant Impact EA-1731: Final Environmental Assessment

296

Incorporating Demand Response into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Environmental Energy Technologies Division July 2013 Theprograms types: pricing with enabling technology, pricingwithout enabling technology, direct load control,

Satchwell, Andrew

2014-01-01T23:59:59.000Z

297

Incorporating Demand Response into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Aggregator Programs. Demand Response Measurement andIncorporating Demand Response into Western Interconnection13 Demand Response Dispatch

Satchwell, Andrew

2014-01-01T23:59:59.000Z

298

Transmission Planning Process and Opportunities for Utility-Scale...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the institutional waters of the relevant agencies and boards. This report is a primer for solar developers who wish to engage directly in expediting the regulatory process...

299

Incorporating Energy Efficiency into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Final Report. Prepared for Xcel Energy. Nexant. 2010. Systemin Section 2.2. PSCO Customer-Funded EE Programs (Xcel):Xcel staff indicated that the load forecast provided to WECC

Barbose, Galen

2014-01-01T23:59:59.000Z

300

Incorporating Energy Efficiency into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

WALC WAUW WECC Total SPSC High DSM Case Non- Coincident PeakCAGRs (2010-2032) WECC Reference Case SPSC High DSM CaseQuan, 2010, Incorporating DSM into the Load Forecast.

Barbose, Galen

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Incorporating Demand Response into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

response DSM Demand Side Management EE energy efficiencywith the development of demand-side management (DSM)-related

Satchwell, Andrew

2014-01-01T23:59:59.000Z

302

Incorporating Demand Response into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Interruptible Program BPA Bonneville Power AdministrationIID LADWP SMUD TID AESO BCTC AVA BPA CHPD DOPD GCPD IPC NWMTIID LADWP SMUD TID AESO BCTC AVA BPA CHPD DOPD GCPD IPC NWMT

Satchwell, Andrew

2014-01-01T23:59:59.000Z

303

Incorporating Energy Efficiency into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

Power Administration CFE Comision Federal de Electricidadnon-U.S. BAs (AESO, BCTC, and CFE), no adjustment was madeNo adjustment AESO, BCTC, CFE: U.S. federal standards not

Barbose, Galen

2014-01-01T23:59:59.000Z

304

Incorporating Demand Response into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

CBP Capacity Bidding Program CFE Comision Federal dePGN PSE SCL TPWR WAUW APS CFE EPE NEVP PACE PNM PSCO SPP SRPPGN PSE SCL TPWR WAUW APS CFE EPE NEVP PACE PNM PSCO SPP SRP

Satchwell, Andrew

2014-01-01T23:59:59.000Z

305

Incorporating Energy Efficiency into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

2010. Improving Energy Efficiency for Albertas IndustrialEnergy Assessment of Energy Efficiency Potentials (2010-2010. Improving Energy Efficiency for Albertas Industrial

Barbose, Galen

2014-01-01T23:59:59.000Z

306

Incorporating Energy Efficiency into Western Interconnection Transmission Planning  

E-Print Network [OSTI]

s December 2009, California Energy Demand 2010-2020 Adoptedsavings from both energy efficiency and demand response. Weto the annual energy and peak demand in 2021. See Appendix A

Barbose, Galen

2014-01-01T23:59:59.000Z

307

National Electric Transmission Congestion Study: Preliminary...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study: Preliminary Findings National Electric Transmission Congestion Study: Preliminary Findings The Department hosted three webinars in...

308

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery...

309

Definition: Blackstart Capability Plan | Open Energy Information  

Open Energy Info (EERE)

Blackstart Capability Plan Blackstart Capability Plan Jump to: navigation, search Dictionary.png Blackstart Capability Plan A documented procedure for a generating unit or station to go from a shutdown condition to an operating condition delivering electric power without assistance from the electric system. This procedure is only a portion of an overall system restoration plan.[1] View on Wikipedia Wikipedia Definition A black start is the process of restoring a power station to operation without relying on the external electric power transmission network. Normally, the electric power used within the plant is provided from the station's own generators. If all of the plant's main generators are shut down, station service power is provided by drawing power from the grid through the plant's transmission line. However, during a wide-area

310

Dynamic Transmission Electron Microscopy  

SciTech Connect (OSTI)

Dynamic transmission electron microscopy (DTEM) combines the benefits of high spatial resolution electron microscopy with the high temporal resolution of ultrafast lasers. The incorporation of these two components into a single instrument provides a perfect platform for in situ observations of material processes. However, previous DTEM applications have focused on observing structural changes occurring in samples exposed to high vacuum. Therefore, in order to expand the pump-probe experimental regime to more natural environmental conditions, in situ gas and liquid chambers must be coupled with Dynamic TEM. This chapter describes the current and future applications of in situ liquid DTEM to permit time-resolved atomic scale observations in an aqueous environment, Although this chapter focuses mostly on in situ liquid imaging, the same research potential exists for in situ gas experiments and the successful integration of these techniques promises new insights for understanding nanoparticle, catalyst and biological protein dynamics with unprecedented spatiotemporal resolution.

Evans, James E.; Jungjohann, K. L.; Browning, Nigel D.

2012-10-12T23:59:59.000Z

311

Electricity Advisory Committee Meeting Presentations October 2011 -  

Broader source: Energy.gov (indexed) [DOE]

Interconnection-Wide Transmission Planning Processes Interconnection-Wide Transmission Planning Processes Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes Panel Discussion on Interconnection-Wide Transmission Planning Processes Interconnection-Wide Planning in the Eastern Interconnection - David Whiteley, Eastern Interconnection Planning Collaborative WECC Regional Transmission Expansion Planning (RTEP)10 year plan - Brad Nickell, Western Electricity Coordinating Council Transmission Planning in the ERCOT Interconnection 2011 - Warren Lasher, Electric Reliability Council of Texas EAC Presentation - Interconnection-Wide Planning in the Eastern Interconnection 2011 - Whiteley.pdf EAC Presentation - WECC Regional Transmission Expansion Planning (RTEP)10

312

EIS-0128: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

128: Mitigation Action Plan 128: Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos-Gates (Path 15) Transmission Project This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Elect, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE/EIS-0128, Western Area Power Administration, Mitigation Action Plan for the Los Banos-Gates (Path 15) Transmission Project (January 2003) More Documents & Publications EIS-0128: Mitigation Action Plan FAQS Gap Analysis Qualification Card - Mechanical Systems

313

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

Compatibility of Wind and Solar Technology with Conventionalabout the choice of solar technology and solar financing areterm assumed for solar technologies than for other renewable

Mills, Andrew

2010-01-01T23:59:59.000Z

314

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

renewable resources as the avoided cost of the alternativethe renewable resource. The avoided cost of the alternativelocation, the avoided energy cost must be considered based

Mills, Andrew

2010-01-01T23:59:59.000Z

315

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

renewable resources as the avoided cost of the alternativethe renewable resource. The avoided cost of the alternativelocation, the avoided energy cost must be considered based

Mills, Andrew D

2011-01-01T23:59:59.000Z

316

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

Corp. , 2010. Eastern Wind Integration and Transmissionexpansion is limited, wind integration costs are assumed toof wind (BPA, 2009). Wind integration costs in the U.S. are

Mills, Andrew

2010-01-01T23:59:59.000Z

317

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

Corp. , 2010. Eastern Wind Integration and Transmissionof wind (BPA, 2009). Wind integration costs in the U.S. are2009). A recent wind integration study that evaluated up to

Mills, Andrew D

2011-01-01T23:59:59.000Z

318

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

more valuable than solar without storage. not appear topenetration of solar without storage cannot be as readilypenetration of solar without storage, the marginal capacity

Mills, Andrew

2010-01-01T23:59:59.000Z

319

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

Thermal, Dry Cooling with Storage Solar Thermal, Wet Coolingas wind and solar without thermal storageare added to theWind Wet Cooled Solar Thermal with Storage Wet Cooled Solar

Mills, Andrew D

2011-01-01T23:59:59.000Z

320

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

reliance on solar energy without thermal storage than iswind energy and solar technologies without thermal storageenergy and solar technologies that lack thermal storage. A

Mills, Andrew

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

series for both the renewable resource and the load producedvalue of different renewable resources, and to rank thosefactor of the renewable resource, and financing parameters

Mills, Andrew D

2011-01-01T23:59:59.000Z

322

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

augmented with a capacity market payment that is separate92/kW-yr. Recent forward capacity market auctions in ISO-Newzone within PJM. Forward capacity markets, however, are only

Mills, Andrew

2010-01-01T23:59:59.000Z

323

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

Modeling utility-scale wind power plants. Part 2: CapacityIf the same wind plant were to deliver its power to a load

Mills, Andrew D

2011-01-01T23:59:59.000Z

324

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

Modeling utility-scale wind power plants. Part 2: CapacityIf the same wind plant were to deliver its power to a load

Mills, Andrew

2010-01-01T23:59:59.000Z

325

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

of nearby solar, geothermal, and wind energy resources toenergy demand. Solar energy is the second largest resource,

Mills, Andrew D

2011-01-01T23:59:59.000Z

326

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

their renewable resources from solar energy; wind makes upenergy demand. Solar energy is the second largest resource,in this paper. Solar energy is the second largest resource,

Mills, Andrew

2010-01-01T23:59:59.000Z

327

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

pdf. Bonneville Power Administration (BPA). 2009.2010 BPA Rate Case Wholesale Power Rate Initial Proposal:corporate/ratecase/2008/2010_BPA_Rate_Case/docs/WP-10-E-

Mills, Andrew D

2011-01-01T23:59:59.000Z

328

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

lbnl-1642e.pdf Bonneville Power Administration (BPA). 2009.2010 BPA Rate Case Wholesale Power Rate Initial Proposal:corporate/ratecase/2008/2010_BPA_Rate_Case/docs/WP-10-E-BPA-

Mills, Andrew

2010-01-01T23:59:59.000Z

329

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

a small margin only when solar thermal energy is assumed todelivered cost of solar thermal energy. Wind energy, on thecreate a simple energy-balance type solar thermal dispatch

Mills, Andrew

2010-01-01T23:59:59.000Z

330

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

Arizona, Nevada, and California rely on solar energy to meetVariability of Solar Power. Berkeley, California: LawrenceSolar Photovoltaic Electricity Production. Berkeley, California:

Mills, Andrew D

2011-01-01T23:59:59.000Z

331

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

from southern California solar and geothermal resources andwind and solar from southern California. The technology thatVariability of Solar Power. Berkeley, California: Lawrence

Mills, Andrew

2010-01-01T23:59:59.000Z

332

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

geothermal, biomass, and hydropower). Finally, Olson etthe contributions of hydropower, biomass, and geothermal dothe contribution of hydropower, biomass, and geothermal

Mills, Andrew D

2011-01-01T23:59:59.000Z

333

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

consists of biomass and hydropower resources. The technologyBiomass, geothermal, and hydropower are found to represent acost of Washington (WA) hydropower under the competitive

Mills, Andrew

2010-01-01T23:59:59.000Z

334

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

reduction in average renewable energy costs WECC-wide byscenarios on renewable energy supply costs and transmissiondifferent renewable energy procurement, technology cost,

Mills, Andrew D

2011-01-01T23:59:59.000Z

335

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

The value of compressed air energy storage with wind inBlack & Veatch Compressed air energy storage Combined-cycleplant and adding compressed air energy storage (CAES) with a

Mills, Andrew

2010-01-01T23:59:59.000Z

336

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

geothermal and biomass, have TOD energy values that are equal or nearly equal to average marginal production costs.Cost with Starting Point Assumptions ($/MWh) Energy- Weighted Median (10th; 90th Percentile) Hydro Biomass GeothermalEnergy Price Integration Costs High Cost Case Low Cost Case (Low || Base || High) Geothermal (

Mills, Andrew

2010-01-01T23:59:59.000Z

337

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

Case Category: Case Name: HVDC Long Lines High Utilizationa What if lower unit cost HVDC lines were used for longof renewable technologies? a HVDC lines were assumed to have

Mills, Andrew D

2011-01-01T23:59:59.000Z

338

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

zone in the Base case, the HVDC Long Lines case, and the RECselection to meet 33% RE WECC-wide in the HVDC Long LinesREC Base Case Short Line HVDC Long Lines Equal Solar Finance

Mills, Andrew

2010-01-01T23:59:59.000Z

339

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Description New 500 kV substation into Southwest PowerlinkLine Expand Midpoint Substation and construct thirdto Kramer Jct. and Lugo Substation 2010 20% RPS target with

Mills, Andrew D.

2009-01-01T23:59:59.000Z

340

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network [OSTI]

the full capacity of the wind power plant at all times. Theto wind projects than to conventional power plants. Thecoal plants) can be leveraged to efficiently move wind power

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

turbines and compressed air energy storage for supplementalresources and compressed air energy storage (CAES). Energy

Mills, Andrew D.

2009-01-01T23:59:59.000Z

342

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

society bear to deliver wind power to load centers? Withoutstrategy by allowing wind power to be dispatched down orwind generation in Wyoming, for instance, will initially provide power to

Mills, Andrew D.

2009-01-01T23:59:59.000Z

343

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION  

Broader source: Energy.gov [DOE]

The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

344

Transmission Reliability | Department of Energy  

Energy Savers [EERE]

design, long-term supply and transmission investment, renewable integration, demand response, and environmental impacts. Researchers use models and simulations to assess how...

345

NREL: Transmission Grid Integration - Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects NREL's transmission integration projects provide data and models that help utilities and policymakers make informed decisions about the integration of variable generation,...

346

CORPORATE AND STRATEGIC PLANNING Faculty planning workbook  

E-Print Network [OSTI]

.............................................................................33 Staffing & workforce planningCORPORATE AND STRATEGIC PLANNING Faculty planning workbook Humanities, Law & Social Studies Outcomes from 2008/09 Confirmation of progress during 2009/10 Faculty planning for 2010/11 ­ 2012/13 #12

347

Proactive Planning  

E-Print Network [OSTI]

, rainwater harvesting, stream bank stabilization, and educational programs to prevent urban and agricultural nonpoint source pollution. Project leaders plan to have the Cedar Creek Watershed Protection Plan finalized by the summer of 2008. ?We... on watershed management, stream restoration practices, agricultural best man- agement practices, rainwater harvesting, non- point source pollution control, on-site septic system maintenance, and other water quality issues facing urban and rural...

Wythe, Kathy

2008-01-01T23:59:59.000Z

348

Ocotillo Wind I Expansion | Open Energy Information  

Open Energy Info (EERE)

I Expansion I Expansion Jump to: navigation, search Name Ocotillo Wind I Expansion Facility Ocotillo Wind I Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status Under Construction Owner Pattern Energy Developer Pattern Energy Energy Purchaser San Diego Gas & Electric Location Ocotillo CA Coordinates 32.76302656°, -116.0466957° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.76302656,"lon":-116.0466957,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

349

Century Wind Project Expansion | Open Energy Information  

Open Energy Info (EERE)

Project Expansion Project Expansion Jump to: navigation, search Name Century Wind Project Expansion Facility Century Wind Project Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner MidAmerican Energy Developer EnXco Energy Purchaser MidAmerican Energy Location Wright and Hamilton Counties IA Coordinates 42.509141°, -93.682151° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.509141,"lon":-93.682151,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

350

Design Under Uncertainty Employing Stochastic Expansion Methods  

E-Print Network [OSTI]

Non-intrusive polynomial chaos expansion (PCE) and stochastic collocation (SC) meth- ods and ability to produce functional representations of stochastic variability. PCE estimates coefficients with both techniques for general probabilistic analysis problems. Once PCE or SC representations have been

351

Low expansion superalloy with improved toughness  

DOE Patents [OSTI]

A high strength, low coefficient of thermal expansion superalloy exhibiting improved toughness over a broad temperature range down to about 4 K is disclosed. The composition is adapted for use with wrought superconducting sheathing.

Smith, D.F.; Stein, L.I.; Hwang, I.S.

1995-06-20T23:59:59.000Z

352

Meteorological Network Expansion Using Information Decay Concept  

Science Journals Connector (OSTI)

A generalized network design methodology was developed by using the basic entropy concept introduced by Shannon in communication engineering. In order to select potential sites for meteorological network expansion purposes, the meteorological ...

Tahir Husain; Mustafa A. Ukayli; Hasin U. Khan

1986-03-01T23:59:59.000Z

353

Flat Ridge 2 Expansion | Open Energy Information  

Open Energy Info (EERE)

Flat Ridge 2 Expansion Flat Ridge 2 Expansion Jump to: navigation, search Name Flat Ridge 2 Expansion Facility Flat Ridge 2 Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner BP Wind Energy Developer BP Wind Energy Energy Purchaser Arkansas Electric Cooperative Corp Location Sharon KS Coordinates 37.383239°, -98.334088° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.383239,"lon":-98.334088,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

354

Ultracold Plasma Expansion in a Magnetic Field  

Science Journals Connector (OSTI)

We measure the expansion of an ultracold plasma across the field lines of a uniform magnetic field. We image the ion distribution by extracting the ions with a high-voltage pulse onto a position-sensitive detector. Early in the lifetime of the plasma (magnetic field (up to 70G). We observe that the expansion velocity scales as B-1/2, explained by a nonlinear ambipolar diffusion model with anisotropic diffusion in two different directions.

X. L. Zhang; R. S. Fletcher; S. L. Rolston; P. N. Guzdar; M. Swisdak

2008-06-13T23:59:59.000Z

355

HVDC power transmission technology assessment  

SciTech Connect (OSTI)

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

356

Hydrogen Transmission and Distribution Workshop  

Broader source: Energy.gov [DOE]

Proceedings from the Hydrogen Transmission and Distribution Workshop held February 25-26, 2014, in Golden, Colorado. The objective was to discuss and share information on the research, development, and demonstration needs and challenges for low-cost, effective hydrogen transmission and distribution from centralized production facilities to the point of use.

357

Direct current power transmission systems  

SciTech Connect (OSTI)

This book represents text on HVDC transmission available. It deals with the various aspects of the state of the art in HVDC transmission technology. This book presents many aspects of interactions of AC/DC systems. Modeling and analysis of DC systems are also discussed in detail.

Padiyar, K.R.

1991-01-01T23:59:59.000Z

358

The struggle for safe nuclear expansion in China  

Science Journals Connector (OSTI)

Abstract After a temporary halt following the Fukushima nuclear disaster in March 2011, China resumed its fast, yet cautious, expansion of nuclear energy programme. Nuclear energy is considered as part of the general strategy to deal with the challenges of energy security and climate change and to advance with state of the art technology in its development. This article briefly discusses recent development in and driving forces behind nuclear industry in China, and several challenges it has been facing: how to adopt, adapt, standardise and indigenise whose technologies, and how to address the shortage of qualified nuclear engineers, scientists, skilled labour force and qualified regulators. More importantly, it argues that safe and secure nuclear development requires consistent policies and effective regulations. Therefore, it is crucial to build policy and regulatory capacities based on coordination, planning and management of government agencies and the industry.

Y.C. Xu

2014-01-01T23:59:59.000Z

359

Statement from Energy Secretary Samuel W. Bodman on the Expansion of the  

Broader source: Energy.gov (indexed) [DOE]

Statement from Energy Secretary Samuel W. Bodman on the Expansion Statement from Energy Secretary Samuel W. Bodman on the Expansion of the Strategic Petroleum Reserve to 1.5 Billion Statement from Energy Secretary Samuel W. Bodman on the Expansion of the Strategic Petroleum Reserve to 1.5 Billion January 23, 2007 - 10:15am Addthis "Later today President Bush will announce his plan to double our nation's Strategic Petroleum Reserve to 1.5 billion barrels. I believe that expanding the Strategic Petroleum Reserve is a wise and prudent policy decision that will provide an additional layer of protection for our nation's energy security. "Originally established in 1975 in the aftermath of the Arab oil embargo, the Strategic Petroleum Reserve is a national asset that can be used in the case of severe supply disruption. During my tenure alone, we've used it a

360

Statement from Energy Secretary Samuel W. Bodman on the Expansion of the  

Broader source: Energy.gov (indexed) [DOE]

the Expansion the Expansion of the Strategic Petroleum Reserve to 1.5 Billion Statement from Energy Secretary Samuel W. Bodman on the Expansion of the Strategic Petroleum Reserve to 1.5 Billion January 23, 2007 - 10:15am Addthis "Later today President Bush will announce his plan to double our nation's Strategic Petroleum Reserve to 1.5 billion barrels. I believe that expanding the Strategic Petroleum Reserve is a wise and prudent policy decision that will provide an additional layer of protection for our nation's energy security. "Originally established in 1975 in the aftermath of the Arab oil embargo, the Strategic Petroleum Reserve is a national asset that can be used in the case of severe supply disruption. During my tenure alone, we've used it a number of times, most notably in the aftermath of Hurricanes Katrina and

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Expansion of Facilities on the North Slope of Alaska in Time for the  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Expansion of Facilities on the North Slope of Alaska in Time for the Expansion of Facilities on the North Slope of Alaska in Time for the International Polar Year Zak, Bernard Sandia National Laboratories Ivey, Mark Sandia National Laboratories Zirzow, Jeffrey Sandia National Laboratories Brower, Walter UIC Science Division ARM/NSA Ivanoff, James NSA Whiteman, Doug NSA/AAO Sassen, Kenneth University of Alaska Fairbanks Truffer-Moudra, Dana University of Alaska Fairbanks Category: Infrastructure & Outreach The International Polar Year (IPY; 2007-2008) will stimulate research in both polar regions, primarily focusing on the rapid climate-related changes occurring at high latitudes. In part in preparation for the IPY, facilities at the NSA ACRF are undergoing expansion. In addition, with funding through NOAA, Phase 1 of the planned $60M Barrow Global Climate Change Research

362

Navajo Transmission Project Draft Environmental Impact Statement (DEIS)  

Broader source: Energy.gov (indexed) [DOE]

. . SUMRY INTRODUCTION Din6 Power Authority @PA), a Navajo Nation enterprise, proposes to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project ~), is currentiy planned to be in service in the year 2001 and operate for about 50 years. The preparation of an environment impact statement @IS) is required because of Federal government involvement, which includes (1) granting rights-of-way across Federrd and tribal lands and (2) certain participation by Western Area Power Administration ~estem), and agency of the U.S. Department of Energy (DOE). In accordance the National Environmental Policy Act of 1969 ~PA), Council on Environmental Quality (CEQ) regulations

363

CFN Ops Plan | Work Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations Plan Operations Plan Work Planning & Control for Experiments and Operations All experimental work will be conducted in accordance with Work Planning and Control for Experiments and Operations, which ensures proper design and operation of all experiments prior to their commencement. CFN will use the SBMS provided standard form for the formal documentation. The Lead Experimenter/Responsible person will notify the Experimental Safety Review Committee of any new experiments or modifications to existing experiments. CFN will appoint an Experimental Safety Review Committee. This committee will consist of the Experiment Review Coordinator, CFN personnel, Facility Support Representative (FSR), Environmental Compliance Representative (ECR). Additional subject matter experts may be appointed on an ad-hoc

364

ITC Transmission | Open Energy Information  

Open Energy Info (EERE)

ITC Transmission ITC Transmission Jump to: navigation, search Name ITC Transmission Place Michigan Utility Id 56068 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=ITC_Transmission&oldid=410858" Categories: EIA Utility Companies and Aliases Utility

365

Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

15eswise2012p.pdf More Documents & Publications Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production Expansion of Novolyte Capacity for Lithium Ion Electrolyte...

366

Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

15eswise2011p.pdf More Documents & Publications Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production Expansion of Novolyte Capacity for Lithium Ion Electrolyte...

367

Expansion and Improvement of Solar Water Heating Technology in...  

Open Energy Info (EERE)

Expansion and Improvement of Solar Water Heating Technology in China Project Management Office Jump to: navigation, search Name: Expansion and Improvement of Solar Water Heating...

368

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric  

Broader source: Energy.gov (indexed) [DOE]

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development activities for the electric transmission and distribution system. OE has prepared this program plan pursuant to the requirements of Section 925 of the Energy Policy Act of 2005 (EPACT), as outlined below. This plan delineates research directions and priorities. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs.

369

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric  

Broader source: Energy.gov (indexed) [DOE]

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development activities for the electric transmission and distribution system. OE has prepared this program plan pursuant to the requirements of Section 925 of the Energy Policy Act of 2005 (EPACT), as outlined below. This plan delineates research directions and priorities. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs.

370

Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions  

Broader source: Energy.gov [DOE]

Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed that gap in recent...

371

Remarks for DOE Workshop Regarding Transmission Congestion Study  

Broader source: Energy.gov (indexed) [DOE]

6, 2011 6, 2011 Remarks for DOE Workshop Regarding Transmission Congestion Study Thank you for the opportunity to speak today. I am Ed Finley and I chair the North Carolina Utilities Commission. By way of background, with the exception of a very small portion of the State - the northeast - North Carolina does not participate in a regional transmission organization, or RTO, and our electric utilities remain vertically integrated. North Carolina's electric utilities are required to plan their systems on a least-cost, integrated basis, considering generation and transmission costs, as well as energy efficiency and demand-side management. There is no retail competition in North Carolina. Regulation in North Carolina follows the "command and control" model. The NC Commission must

372

GRR/Section 8-ID-a - State Transmission | Open Energy Information  

Open Energy Info (EERE)

8-ID-a - State Transmission 8-ID-a - State Transmission < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-ID-a - State Transmission 08IDAStateTransmission.pdf Click to View Fullscreen Contact Agencies Idaho Public Utilities Commission Regulations & Policies IC §67-6508: Local Land Use Planning Duties IC §61-526: Certificate of Public Convenience and Necessity Triggers None specified Click "Edit With Form" above to add content 08IDAStateTransmission.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 8-ID-a.1 - Will the Transmission Project Be Undertaken by a Public Utility?

373

Energy Transmission and Infrastructure  

SciTech Connect (OSTI)

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); analyze the potential within the district to utilize farm wastes to produce biofuels; enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; identify the policy, regulatory, and financial barriers impeding development of a new energy system; and improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the Colleges yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

374

SunShot Initiative: Transmission Grid Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Grid Integration to Transmission Grid Integration to someone by E-mail Share SunShot Initiative: Transmission Grid Integration on Facebook Tweet about SunShot Initiative: Transmission Grid Integration on Twitter Bookmark SunShot Initiative: Transmission Grid Integration on Google Bookmark SunShot Initiative: Transmission Grid Integration on Delicious Rank SunShot Initiative: Transmission Grid Integration on Digg Find More places to share SunShot Initiative: Transmission Grid Integration on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards

375

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

Chapter 7.1 (May 2012 second revision) Chapter 7.1 (May 2012 second revision) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

376

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

-Chapter 7.1 (May 2012) -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

377

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

January 2011) January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

378

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

OCTOBER 2010) OCTOBER 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

379

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

PLANNING PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 6 Competition Requirements 4. FAR Part 7 Acquisition Planning 5. FAR Part 8 Required Sources of Supply 6. FAR Part 9 Contractor Qualifications 7. FAR Part 10 Market Research 8. FAR Part 11 Describing Agency Needs 9. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 10. FAR Subpart 16.1 Selecting Contract Types 11. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 12. FAR 17 Special Contracting Methods 13. FAR Part 19 Small Business Programs 14. FAR 25.802(a)(2) Other International Agreements and Coordination 15. FAR 34.004 Acquisition Strategy

380

Effects of restraint on expansion due to delayed ettringite formation  

Science Journals Connector (OSTI)

Delayed ettringite formation (DEF) is a chemical reaction that causes expansion in civil engineering structures. The safety level of such damaged structures has to be reassessed. To do this, the mechanical conditions acting on DEF expansions have to be analysed and, in particular, the variation of strength with expansion and the effect of restraint on the DEF expansion. This paper highlights several points: DEF expansion is isotropic in stress-free conditions, compressive stresses decrease DEF expansion in the direction subjected to restraint and lead to cracks parallel to the restraint, and expansion measured in the stress-free direction of restrained specimens is not modified. Thus restraint causes a decrease of the volumetric expansion and DEF expansion under restraint is anisotropic. Moreover, the paper examines the correlation between DEF expansion and concrete damage, providing data that can be used for the quantification of the effect of stresses on DEF induced expansion.

Hassina Bouzabata; Stphane Multon; Alain Sellier; Hacne Houari

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Department of Energy Announces Plans for Additional Comment Period on  

Broader source: Energy.gov (indexed) [DOE]

Announces Plans for Additional Comment Period Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors Department of Energy Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors November 9, 2006 - 9:38am Addthis Under Section 1221(a) of the Energy Policy Act of 2005, the Department of Energy must issue a report based on the Department's August 8 Congestion Study. In that report, the Secretary may designate as a "national interest electric transmission corridor" (National Corridor) any geographic area experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers. After issuing the August 8 Congestion Study, the Department invited public comment and received comments on the study from a variety of entities

382

A Traffic Density Analysis of Proposed Ferry Service Expansion in San Francisco Bay Using a Maritime Simulation Model  

E-Print Network [OSTI]

a Maritime Simulation Model Jason R. W. Merrick* Department of Statistical Sciences and Operations Research and their increases caused by three alternative expansion plans. The output of the simulation model is a geographic of congestion on the waterway and the effect this will have on the safety of vessels in the area. A simulation

van Dorp, Johan René

383

Building Technologies Program Planning Summary  

Broader source: Energy.gov (indexed) [DOE]

Building Technologies Program Planning Summary Building Technologies Program Planning Summary Introduction The U.S. Department of Energy's (DOE) Building Technologies Program (BTP) works in partnership with industry, state, municipal, and other federal organizations to achieve the goals of marketable net-zero energy buildings. Such buildings are extremely energy efficient, ideally producing as much energy as they use over the course of a year. BTP also works with stakeholders and federal partners to meet any remaining energy needs for their buildings through on-site renewable energy systems. Drivers Population growth and economic expansion, along with an accompanying increase in energy demand, are expected to drive energy consumption in buildings to more than 50 quadrillion Btu (quads)

384

Electrical transmission line diametrical retainer  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

385

Cost-Effectivenessof PhotovoltaicGenerationIn A Transmission-Constrained Load Area of An InterconnectedSystem  

E-Print Network [OSTI]

stations and then deliver that energy through the interconnected transmission and distribution systems are important factors for electricity enterprises to consider in their planning activities. One new important Abstract: Electric power systems of today are experiencing a difficulty of constrained transmission lines

Gross, George

386

EA-1456: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Mitigation Action Plan 6: Mitigation Action Plan EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado Western proposes to upgrade the existing 146 miles of CH-MM 115kB transmission line which crosses Carbon, Albany and Larmie Counties in Wyoming and 35 miles of the AU-CH transmission line which corsses portions of Laramie Counties, Wyoming and Weld County, Colorado. The upgrade would remove the existing 115-kV H-frame structures and replace them with new 230-Kv H-frame structures and single pole steel structures. Western also proposes to widen the existing right-of-way (ROW), where necessary to allow adequate electrical clearances. Mitigation Action Plan to Implement Mitigation Requirements for

387

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

SciTech Connect (OSTI)

California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

2008-07-01T23:59:59.000Z

388

Coordination of Transmission Line Transfer Capabilities  

E-Print Network [OSTI]

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

389

Video transmission over wireless networks  

E-Print Network [OSTI]

Compressed video bitstream transmissions over wireless networks are addressed in this work. We first consider error control and power allocation for transmitting wireless video over CDMA networks in conjunction with multiuser detection. We map a...

Zhao, Shengjie

2005-08-29T23:59:59.000Z

390

National Electric Transmission Congestion Studies  

Broader source: Energy.gov [DOE]

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to include in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmission capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor).

391

OpenEI Community - transmission  

Open Energy Info (EERE)

black out brown out bulk power system electricity grid future grid grid history security Smart Grid transmission Smart Grid Fri, 31 Oct 2014 17:58:14 +0000 Dc 955 at...

392

METRIC PROPERTIES AND EXCEPTIONAL SETS OF THE OPPENHEIM EXPANSIONS  

E-Print Network [OSTI]

METRIC PROPERTIES AND EXCEPTIONAL SETS OF THE OPPENHEIM EXPANSIONS OVER THE FIELD OF LAURENT SERIES in a large class of Oppenheim expansions of Laurent series, including Luroth, Engel, Sylvester expansions properties fail to hold. Key Words and Phrases Oppenheim expansions, Laurent series, #12;nite #12;eld

Fan, Ai-Hua

393

Forward Expansion Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Forward Expansion Wind Farm Forward Expansion Wind Farm Facility Forward Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Energy Purchaser Alliant- Wisconsin Public Service-Madison Gas & Electric- Wisconsin Public Power Location Dodge and Fond du Lac Counties WI Coordinates 43.631519°, -88.556421° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.631519,"lon":-88.556421,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

394

DOE/EA-0845 Environmental Assessment Expansion  

Broader source: Energy.gov (indexed) [DOE]

45 45 Environmental Assessment Expansion of the Idaho National Engineering Laboratory Research Center March 1994 U.S. Department of Energy MASTER DOE Idaho Operations Office Idaho Falls, Idaho _.OJ Oi_lll_lHl:lUTION OF TFII$O_r, UM_._T _ U_LJ_!_3'_ [6450-01] U.S. DEPARTMENT OF ENERGY FINDINGOF NO SIGNIFICANT IMPACT . FOR EXPANSION OF THE IDAHONATIONALENGINEERING LABORATORY RESEARCH CENTER AGENCY: Department of Energy ACTION: Findingof No Significant Impact(FONSI) SUMMARY: The Department of Energy(DOE)has prepared an environmental assessment (EA),DOE/EA-0845, for expansion and upgrade of facilities at the IdahoNationalEngineering Laboratory (INEL)Research Center(IRC)in Idaho Falls,Idaho. Construction and operation of proposed facilities wouldnot causesignificant environmental impacts. Basedon the analysesin the EA, DOE has determined that the proposedactionis

395

Secretary Chu Announces Efforts to Strengthen U.S. Electric Transmission  

Broader source: Energy.gov (indexed) [DOE]

Chu Announces Efforts to Strengthen U.S. Electric Chu Announces Efforts to Strengthen U.S. Electric Transmission Networks Secretary Chu Announces Efforts to Strengthen U.S. Electric Transmission Networks December 18, 2009 - 12:00am Addthis Washington, DC-Energy Secretary Steven Chu announced today award selections for $60 million in funding from the American Recovery and Reinvestment Act to support transmission planning for the country's three interconnection transmission networks. The 6 awards will promote collaborative long-term analysis and planning for the Eastern, Western and Texas electricity interconnections, which will help states, utilities, grid operators, and others prepare for future growth in energy demand, renewable energy sources, and Smart Grid technologies. This represents the first-ever effort

396

PRE-STUDY COMMENTS OF IOWA UTILITIES BOARD ON DOE 2012 ELECTRIC TRANSMISSION CONGESTION STUDY  

Broader source: Energy.gov (indexed) [DOE]

PRE-STUDY COMMENTS OF IOWA UTILITIES BOARD ON PRE-STUDY COMMENTS OF IOWA UTILITIES BOARD ON DOE 2012 ELECTRIC TRANSMISSION CONGESTION STUDY JANUARY 2012 The Iowa Utilities Board (Board) is pleased to provide these comments as the Department of Energy (DOE) commences its next transmission congestion study (2012). These comments are organized to give DOE a perspective on electric transmission issues in Iowa - transmission planning, congestion, and siting. Iowa has been a leader in wind generation installation as well as manufacturing of wind turbines. Iowa has the second most installed wind capacity of any state. Since the DOE 2009 congestion study, Iowa added 884 MW of wind generation in 2009 -2010. MidAmerican Energy Company (MidAmerican), an Iowa investor owned utility added 593.5 MW in 2011 and plans to

397

Negative differential transmission in graphene  

Science Journals Connector (OSTI)

By using the Kubo linear response theory with the Keldysh Green function approach, we investigate the mechanism leading to the negative differential transmission in a system with the equilibrium electron density much smaller than the photon-excited one. It is shown that the negative differential transmission can appear at low probe-photon energy (in the order of the scattering rate) or at high energy (much larger than the scattering rate). For the low probe-photon energy case, the negative differential transmission is found to come from the increase of the intraband conductivity due to the large variation of electron distribution after the pumping. As for the high probe-photon energy case, the negative differential transmission is shown to tend to appear with the hot-electron temperature being closer to the equilibrium one and the chemical potential higher than the equilibrium one but considerably smaller than half of the probe-photon energy. We also show that this negative differential transmission can come from both the inter- and the intraband components of the conductivity. Especially, for the interband component, its contribution to the negative differential transmission is shown to come from both the Hartree-Fock self-energy and the scattering. Furthermore, the influence of the Coulomb-hole self-energy is also addressed.

B. Y. Sun and M. W. Wu

2013-12-17T23:59:59.000Z

398

Tax-Advantaged Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plans Tax-Advantaged Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact...

399

Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West  

Broader source: Energy.gov (indexed) [DOE]

AGENDA TUESDAY, FEBRUARY 7 MEETING ROOM-WINDOWS ROOM 8:30am - 8:50am WELCOME, INTRODUCTIONS AND OPENING REMARKS CONTINENTAL BREAKFAST WILL BE SERVED Tracey A. LeBeau, Director, DOE Office of Indian Energy Lamont Jackson, Representative, DOE Office of Electricity Delivery and Energy Reliability Introductions 8:50am - 9:10am FEDERAL TRANSMISSION DISCUSSION: TRANSMISSION EXPANSION IN THE WEST Timothy Meeks, Administrator, Western Area Power Administration 9:10am - 9:30am TRANSMISSION DEVELOPMENT IN THE PACIFIC: PERSPECTIVES FROM BONNEVILLE POWER ADMINISTRATION Bill Drummond, Deputy Administrator, Bonneville Power Administration 9:30am - 10:45am TRANSMISSION POLICY AND REGULATION PRIMER: OVERVIEW OF JURISDICTIONAL AUTHORITIES & CURRENT POLICY TRENDS

400

DOE Transmission Capacity Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION | Department...  

Broader source: Energy.gov (indexed) [DOE]

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION A Public Meeting on the Quadrennial Energy Review, Hosted by the United...

402

Briefing Memo: Petroleum Product Transmission & Distribution...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Briefing Memo: Petroleum Product Transmission & Distribution Briefing Memo: Petroleum Product Transmission & Distribution Click below to download a PDF of the briefing memo....

403

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2013 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

404

Agenda: Natural Gas: Transmission, Storage and Distribution ...  

Broader source: Energy.gov (indexed) [DOE]

Natural Gas: Transmission, Storage and Distribution Agenda: Natural Gas: Transmission, Storage and Distribution A Public Meeting on the Quadrennial Energy Review, Hosted by the...

405

2006 National Electric Transmission Congestion Study Federal...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

406

National Electric Transmission Congestion Study | Department...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Study National Electric Transmission Congestion Study National Electric Transmission Congestion Study Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C....

407

2009 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

408

Electric Transmission Siting | Open Energy Information  

Open Energy Info (EERE)

navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Electric Transmission SitingLegal Abstract Electric Transmission Siting at the California...

409

2006 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

410

National Electric Transmission Congestion Study Workshops | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study Workshops National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops to receive input...

411

Agenda: Electricity Transmission and Distribution - East | Department...  

Broader source: Energy.gov (indexed) [DOE]

Electricity Transmission and Distribution - East Agenda: Electricity Transmission and Distribution - East A Public Meeting on the Quadrennial Energy Review, Hosted by the United...

412

Agenda: Electricity Transmission, Storage and Distribution -...  

Broader source: Energy.gov (indexed) [DOE]

Electricity Transmission, Storage and Distribution - West Agenda: Electricity Transmission, Storage and Distribution - West A Public Meeting on the Quadrennial Energy Review,...

413

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Impact Statement for the Southline Transmission Line Project General NEPA Document Info Energy Sector Transmission Environmental Analysis Type EIS Applicant Southline...

414

Directly correlated transmission electron microscopy and atom...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directly correlated transmission electron microscopy and atom probe tomography of grain boundary oxidation in a Ni-Al binary Directly correlated transmission electron microscopy...

415

Interior Offers First Right-of-Way for Renewable Energy Transmission in Federal Waters  

Broader source: Energy.gov [DOE]

As part of President Obamas Climate Action Plan to create American jobs, develop clean energy sources and cut carbon pollution, Secretary of the Interior Sally Jewell and Bureau of Ocean Energy Management (BOEM) Acting Director Walter Cruickshank today announced that BOEM has offered a right-of-way (ROW) grant to Deepwater Wind Block Island Transmission System, LLC (Deepwater Wind) for the Block Island Transmission System (BITS).

416

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

7.1 (May 2010) 7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination 13. FAR 34.004 Acquisition Strategy Guiding Principles

417

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

--Chapter 7.1 (JUNE 2010) --Chapter 7.1 (JUNE 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles

418

Expansion Capital Partners LLC | Open Energy Information  

Open Energy Info (EERE)

Expansion Capital Partners LLC Expansion Capital Partners LLC Jump to: navigation, search Name Expansion Capital Partners LLC Address One Embarcadero Center, Suite 4100 Place San Francisco, California Zip 94111 Region Bay Area Product Venture capital firm that invests in expansion-stage, clean technology enterprises Year founded 2001 Phone number (415) 788-8802 Website http://www.expansioncapital.co Coordinates 37.794497°, -122.39962° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.794497,"lon":-122.39962,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

419

Stateline Expansion Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Stateline Expansion Wind Farm Stateline Expansion Wind Farm Jump to: navigation, search Name Stateline Expansion Wind Farm Facility Stateline Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser PPM Energy Inc Location Walla Walla County OR Coordinates 46.012769°, -118.751528° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.012769,"lon":-118.751528,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

420

24 February 1999 Determining Age, Expansion and  

E-Print Network [OSTI]

To Be Younger Than Its Oldest Stars (See Fact #3). 2.) A Universe That Enlarges with Accelerating Expansion (See that of "pure" vacuum space, and the measured capacitance will increase as more and more particles are placed, vapors, nuclear particles, (quarks, wimps, and neutrinos, if they existed separately) or any

Tesfatsion, Leigh

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Intrepid Expansion Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Intrepid Expansion Wind Farm Intrepid Expansion Wind Farm Jump to: navigation, search Name Intrepid Expansion Wind Farm Facility Intrepid Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner MidAmerican Energy Developer MidAmerican Energy Energy Purchaser MidAmerican Energy Location Buena Vista & Sac Counties IA Coordinates 42.483311°, -95.308807° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.483311,"lon":-95.308807,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

422

Exploiting External Collections for Query Expansion  

Science Journals Connector (OSTI)

A persisting challenge in the field of information retrieval is the vocabulary mismatch between a users information need and the relevant documents. One way of addressing this issue is to apply query modeling: to add terms to the original query ... Keywords: Query modeling, blog post retrieval, external expansion

Wouter Weerkamp; Krisztian Balog; Maarten de Rijke

2012-11-01T23:59:59.000Z

423

EA-1736: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan EA-1736: Mitigation Action Plan Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, Los Alamos, New Mexico Based on the analysis of potential environmental impacts presented in the environmental assessment, neither the construction or operation of the expanded Sanitary Effluent Reclamation Facility considered in the two action alternatives for that facility, nor the environmental restoration action measures considered in the two action alternatives for reach S-2 of Sandia Canyon would have significant environmental impacts. Mitigation Action Plan for the Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia

424

Maps and Plans  

E-Print Network [OSTI]

shrouded door to box seats. Rose / Maps and Plans Re-Placing Places 20.1 Rose / Maps and Plans Re-Placing PlacesMaps and Plans Thomas Rose Architectural plans create the

Rose, Thomas

2008-01-01T23:59:59.000Z

425

Environmental Assessment for the USK Loop Line 230 kV Transmission Project.  

SciTech Connect (OSTI)

This Environmental Assessment (EA) covers the transmission/substation facilities that would be constructed or modified. It has been prepared by an interdisciplinary team, as well as through consultation on the Federal, state and local levels. It is subject to a 60-day review by the general public and other agencies and will generally coincide with the release of the final state EIS. This EA presents an expansion of those transmission-related discussions in the state EIS where BPA could undertake their construction or modifiction.

United States. Bonneville Power Administration.

1985-09-01T23:59:59.000Z

426

Low-energy asymptotic expansion of the Green function for one-dimensional Fokker-Planck and Schrdinger equations  

E-Print Network [OSTI]

We consider Schr\\"odinger equations and Fokker-Planck equations in one dimension, and study the low-energy asymptotic behavior of the Green function using a new method. In this method, the coefficient of the expansion in powers of the wave number can be systematically calculated to arbitrary order, and the behavior of the remainder term can be analyzed on the basis of an expression in terms of transmission and reflection coefficients.

Toru Miyazawa

2011-12-26T23:59:59.000Z

427

Annual Training Plan Template  

Broader source: Energy.gov [DOE]

The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

428

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in  

Broader source: Energy.gov (indexed) [DOE]

0: TransWest Express 600 kV Direct Current Transmission 0: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada Summary This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. Public Comment Opportunities

429

DOE/EA-1485: Environmental Assessment for the Nisqually Transmission Line Relocation Project (January 2005)  

Broader source: Energy.gov (indexed) [DOE]

Nisqually Transmission Line Relocation Project Nisqually Transmission Line Relocation Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1485 Bonneville Power Administration January 2005 Nisqually Transmission Line Relocation Project Revision Sheet for Final Environmental Assessment 1 Revision Sheet for the Nisqually Transmission Line Relocation Project Final Environmental Assessment DOE/EA -1485 Summary This revision sheet documents the changes to be incorporated into the Nisqually Transmission Line Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On October 18, 2004, the Preliminary EA was sent to agencies and interested parties. Notification

430

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

431

GRR/Section 8-CA-a - State Transmission | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 8-CA-a - State Transmission GRR/Section 8-CA-a - State Transmission < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8-CA-a - State Transmission 08CAACaliforniaTransmission.pdf Click to View Fullscreen Contact Agencies California Energy Commission Regulations & Policies CPUC General Order (G.O) 131-D Triggers None specified Click "Edit With Form" above to add content 08CAACaliforniaTransmission.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative 8-CA-a.1 to 8-CA-a.2 - Is the Planned Geothermal Plant Capacity Greater than 50 MW The California Energy Commission (CEC) has the statutory responsibility for

432

Career Map: Power Systems/Transmission Engineer  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Power Systems and Transmission Engineer positions.

433

DOE Transmission System Integration Workshop  

Broader source: Energy.gov (indexed) [DOE]

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

434

Transmission Lines Emulating Moving Media  

E-Print Network [OSTI]

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

435

Expansion and Collapse in the Cosmic Web  

Science Journals Connector (OSTI)

We study the kinematics of the gaseous cosmic web at high redshift using Ly? forest absorption in multiple QSO sight lines. Observations of the projected velocity shifts between Ly? absorbers common to the lines of sight to a gravitationally lensed QSO and three more widely separated QSO pairs are used to directly measure the expansion of the cosmic web in units of the Hubble velocity, as a function of redshift and spatial scale. The lines of sight used span a redshift range from about 2 to 4.5 and represent transverse scales from the subkiloparsec range to about 300 h physical kpc. Using a simple analytic model and a cosmological hydrodynamic simulation, we constrain the underlying three-dimensional distribution of expansion velocities from the observed line-of-sight distribution of velocity shear across the plane of the sky. The shape of the shear distribution and its width (14.9 km s-1 rms for a physical transverse separation of 61 h kpc at z = 2, 30.0 km s-1 for 261 h kpc at z = 3.6) are found to be in good agreement with the IGM undergoing large-scale motions dominated by the Hubble flow, making this one of the most direct observations possible of the expansion of the universe. However, modeling the Ly? clouds with a simple "expanding pancake" model, the average expansion velocity of the gaseous structures causing the Ly? forest in the lower redshift (z ~ 2) smaller separation (61 kpc) sample appears about 20% lower than the local Hubble expansion velocity. In order to understand the observed velocity distribution further we investigated the statistical distribution of expansion velocities in cosmological Ly? forest simulations. The mean expansion velocity in the (z ~ 2, separation ~ 60 kpc) simulation is indeed somewhat smaller than the Hubble velocity, as found in the real data. We interpret this finding as tentative evidence for some Ly? forest clouds breaking away from the Hubble flow and undergoing the early stages of gravitational collapse. However, the distribution of velocities is highly skewed, and the majority of Ly? forest clouds at all redshifts from 2 to 3.8 expand with super-Hubble velocities, typically about 5%-20% faster than the Hubble flow. This behavior is explained if most Ly? forest clouds in the column density range typically detectable are expanding filaments that stretch and drain into more massive nodes. The significant difference seen in the velocity distributions between the high- and low-redshift samples may conceivably reflect actual peculiar deceleration, the differences in spatial scale, or our selecting higher densities at lower redshift for a given detection threshold for Ly? forest lines. We also investigate the alternative possibility that the velocity structure of the general Ly? forest could have an entirely different, local origin, as expected if the Ly? forest were produced or at least significantly modified by galactic feedback, e.g., winds from star-forming galaxies at high redshift. However, we find no evidence that the observed distribution of velocity shear is significantly influenced by processes other than Hubble expansion and gravitational instability. To avoid overly disturbing the IGM, galactic winds may be old and/or limp by the time we observe them in the Ly? forest, or they may occupy only an insignificant volume fraction of the IGM. We briefly discuss the observational evidence usually presented in favor of an IGM afflicted by high-redshift extragalactic superwinds and find much of it ambiguous. During the hierarchical buildup of structure, galaxies are expected to spill parts of their interstellar medium and to heat and stir the IGM in ways that make it hard to disentangle this gravitational process from the effects of winds.

Michael Rauch; George D. Becker; Matteo Viel; Wallace L. W. Sargent; Alain Smette; Robert A. Simcoe; Thomas A. Barlow; Martin G. Haehnelt

2005-01-01T23:59:59.000Z

436

Low thermal expansion seal ring support  

DOE Patents [OSTI]

Today, the trend is to increase the temperature of operation of gas turbine engines. To cool the components with compressor discharge air, robs air which could otherwise be used for combustion and creates a less efficient gas turbine engine. The present low thermal expansion sealing ring support system reduces the quantity of cooling air required while maintaining life and longevity of the components. Additionally, the low thermal expansion sealing ring reduces the clearance "C","C'" demanded between the interface between the sealing surface and the tip of the plurality of turbine blades. The sealing ring is supported by a plurality of support members in a manner in which the sealing ring and the plurality of support members independently expand and contract relative to each other and to other gas turbine engine components.

Dewis, David W. (San Diego, CA); Glezer, Boris (Del Mar, CA)

2000-01-01T23:59:59.000Z

437

Tests for the Expansion of the Universe  

E-Print Network [OSTI]

Almost all cosmologists accept nowadays that the redshift of the galaxies is due to the expansion of the Universe (cosmological redshift), plus some Doppler effect of peculiar motions, but can we be sure of this fact by means of some other independent cosmological test? Here I will review some recent tests: CMBR temperature versus redshift, time dilation, the Hubble diagram, the Tolman or surface brightness test, the angular size test, the UV surface brightness limit and the Alcock--Paczy\\'nski test. Some tests favour expansion and others favour a static Universe. Almost all the cosmological tests are susceptible to the evolution of galaxies and/or other effects. Tolman or angular size tests need to assume very strong evolution of galaxy sizes to fit the data with the standard cosmology, whereas the Alcock--Paczynski test, an evaluation of the ratio of observed angular size to radial/redshift size, is independent of it.

Lopez-Corredoira, Martin

2015-01-01T23:59:59.000Z

438

Energy Efficiency in Western Utility Resource Plans Implications for  

Broader source: Energy.gov (indexed) [DOE]

in Western Utility Resource Plans Implications in Western Utility Resource Plans Implications for Regional Assessments and Initiatives Energy Efficiency in Western Utility Resource Plans Implications for Regional Assessments and Initiatives Project scope: Comparative analysis of recent resource plans filed by 14 utilities in the Western U.S. and Canada. Analyze treatment of conventional & emerging resource options-including energy efficiency (EE)-Assess risk analysis & portfolio management -Develop more standardized methods and conventions for resource assessment-Summarize how issues are handled in resource plans; identify "best practices" and offer recommendations-Create information tools for CREPC that facilitate work on related projects (e.g. regional transmission planning) Energy Efficiency in Western Utility Resource Plans Implications for

439

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

transmission right, electricity auction, simultaneous feasibility, transmission pricing. I. INTRODUCTION POINT

440

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

, transmission pricing. I. INTRODUCTION POINT-TO-POINT financial transmission rights (FTRs) (see [2] and [7

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Treatment of Solar Generation in Electric Utility Resource Planning (Presentation)  

SciTech Connect (OSTI)

Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. Through interviews and a questionnaire, the authors gathered information on utility supply planning and how solar is represented. Utilities were asked to provide their resource planning process details, key assumptions (e.g. whether DG is represented as supply or negative load), modeling methodology (e.g. type of risk analytics and candidate portfolio development), capacity expansion and production simulation model software, and solar project representation (project size, capacity value and integration cost adder). This presentation aims to begin the exchange of information between utilities, regulators and other stakeholders by capturing utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

Cory, K.; Sterling, J.; Taylor, M.; McLaren, J.

2014-01-01T23:59:59.000Z

442

Low temperature expansion for the Ising model  

Science Journals Connector (OSTI)

On simple cubic lattices, we compute the low-temperature expansion for the energy of the Ising model through 50 excited bonds in three dimensions and 44 excited bonds in four dimensions. We also give the magnetization through 42 excited bonds. Our method is a recursive enumeration of states with given energies on a set of finite lattices with generalized helical boundary conditions. A linear combination of such lattices cancels finite volume effects.

Gyan Bhanot; Michael Creutz; Jan Lacki

1992-09-28T23:59:59.000Z

443

Accelerating cosmological expansion from shear viscosity  

E-Print Network [OSTI]

The dissipation of energy from local velocity perturbations in the cosmological fluid affects the time evolution of spatially averaged fluid dynamic fields and the cosmological solution of Einstein's field equations. We show how this backreaction effect depends on shear viscosity and other material properties of the dark sector, as well as the spectrum of perturbations. If sufficiently large, this effect could account for the acceleration of the cosmological expansion.

Floerchinger, Stefan; Wiedemann, Urs Achim

2014-01-01T23:59:59.000Z

444

Shock compression and expansion in central collisions  

SciTech Connect (OSTI)

Physics of central symmetric reactions of heavy nuclei, in the beam energy range from few tens of MeV to a couple of GeV per nucleon, is discussed. Within transport simulations, it is shown that shock fronts perpendicular to the beam axis form in the head-on reactions. The fronts propagate into projectile and target and they separate hot compressed matter from normal matter. With an increase of the impact parameter, the angle of inclination of fronts relative to the beam axis decreases, and in-between the fronts a weak tangential discontinuity develops. Hot matter exposed to the vacuum in directions perpendicular to the shock motion (and parallel to fronts), starts to expand sideways, early within reactions. Expansion in the direction of shock motion follows, after the shocks traverse nuclei, but due to the delay does not acquire same strength. Expansion affects angular distributions and mean-energy components, and further shapes of spectra and mean energies of different particles emitted into any one direction, and also particle yields. Both the anisotropy in the expansion and a collective motion associated with the weak discontinuity, affect the magnitude of sideward flow within reaction plane. Differences in mean particle energy components in and out of the reaction plane in semicentral collisions, depend sensitively on the relative magnitude of shock speed in normal matter and speed of sound in hot matter. The missing energy, considered in the past in association with low measured pion-multiplicity in central reactions, may be identified with the energy of collective expansion.

Danielewicz, P. [Univ. of Washington, Seattle, WA (United States). Institute for Nuclear Theory]|[Michigan State Univ., East Lansing, MI (United States)

1995-01-01T23:59:59.000Z

445

Real-Options-Based Planning Strategies under Uncertainty Anshuman Gupta and Costas D. Maranas*  

E-Print Network [OSTI]

opportunities to guide internal planning decisions of a company. This is achieved by applying key financial-range, capacity expansion planning;1,6-8 multi-echelon supply-chain design;9 batch plant design and operation;7, integration of a shaper attitude toward risk, as captured by the us

Maranas, Costas

446

Long-term tool elimination planning for a wafer fab  

Science Journals Connector (OSTI)

Wafer manufacturers must make decisions regarding tool elimination due to changes caused by demand, product mixes, and overseas fab capacity expansion. Such a problem is raised by leading semiconductor manufacturers in Taiwan. This paper is aimed at ... Keywords: Capacity planning, Semiconductor, Tool portfolio

Shu-Hsing Chung; Ming-Hsiu Hsieh

2008-04-01T23:59:59.000Z

447

Power superconducting power transmission cable  

DOE Patents [OSTI]

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

448

Power Transmission, Distribution and Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Transmission, Distribution and Plants A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Abdel-Aal, Radwan E. - Computer Engineering Department, King Fahd University of...

449

McMinnville Area Support Transmission Project : Environmental Assessment.  

SciTech Connect (OSTI)

This document discusses a project to provide continuing reliable electrical service to the McMinnville, Oregon, area. BPA proposes to participate with the City of McMinnville Water and Light Department in constructing a new 230-kilovolt transmission line and substation. BPA has prepared an environmental assessment evaluating the proposed project. Reasons that constructing the line and substation would not cause significant environmental impact include: consistency with local land use plans, consistency of appearance with existing transmission and manufacturing facilities in the area, only slight effect on farmland, and avoidance of wetlands and other environmentally sensitive areas. A finding is included that there is no practicable alternative to locating the project within a 100-year floodplain. 1 fig.

United States. Bonneville Power Administration.

1990-01-01T23:59:59.000Z

450

Statement from Energy Secretary Samuel W. Bodman on the Expansion...  

Broader source: Energy.gov (indexed) [DOE]

the Expansion of the Strategic Petroleum Reserve to 1.5 Billion Statement from Energy Secretary Samuel W. Bodman on the Expansion of the Strategic Petroleum Reserve to 1.5 Billion...

451

Clean Technology for Diesel Expansion | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Technology for Diesel Expansion Clean Technology for Diesel Expansion Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the U.S. DOE's EERE...

452

ORIGINAL PAPER Crystal chemistry, thermal expansion, and Raman spectra  

E-Print Network [OSTI]

along the brucite­forsterite join, linear regression gives a systematic linear decrease in expansivity expansion Á Iron effect Introduction The dense hydrous magnesium silicate (DHMS) minerals along the brucite

Jacobsen, Steven D.

453

Earth pressures and deformations in civil infrastructure in expansive soils  

E-Print Network [OSTI]

This dissertation includes the three major parts of the study: volume change, and lateral earth pressure due to suction change in expansive clay soils, and design of civil infrastructure drilled pier, retaining wall and pavement in expansive soils...

Hong, Gyeong Taek

2008-10-10T23:59:59.000Z

454

Texas State Energy Plan Governor's Competitiveness Council  

Broader source: Energy.gov (indexed) [DOE]

8 8 Texas State Energy Plan Governor's Competitiveness Council July 2008 Table of Contents List of Figures 2 Glossary 3 Executive Summary 5 1. Introduction: Texas' Energy Landscape and Challenges 11 1.1 Structure of the Texas Electricity Markets 13 1.2 Wholesale Electricity Markets in ERCOT 15 1.3 Role of ERCOT and Transmission Planning in Market Facilitation 19 1.4 Retail Electricity Markets in ERCOT 20 1.5 Texas' Future Energy Needs 24 1.6 Summary 25 2. Generation Policy 26 2.1 Overview of Investment Trends

455

Thermal and electrostrictive expansion characteristics of MLC (Multilayer Ceramic) capacitors  

SciTech Connect (OSTI)

We have measured by strain gauge technique, in-plane thermal expansivity (coefficient of thermal expansion) as a function of temperature and electrostrictive expansion as a function of applied DC voltage for ceramic capacitors with X7R, NPO and N1500 dielectrics. Multilayer Ceramic (MLC) capacitor materials from two commercial suppliers were evaluated. Thermal expansivities of these materials were compared to polyimide-quartz boards and alumina ceramic substrates. 4 refs., 9 figs., 1 tab.

Chanchani, R.; Hall, C.A.

1991-01-01T23:59:59.000Z

456

PROJECT MANAGEMENT PLANS Project Management Plans  

Broader source: Energy.gov (indexed) [DOE]

MANAGEMENT PLANS MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Section 4.2 of DOE Guide 430.1-3, DEACTIVATION IMPLEMENTATION GUIDE discusses the content and purpose of deactivation project management plans. It is presented as a suggested outline followed by other potential subjects. For the convenience of readers, that information is repeated below.

457

Representation of the Solar Capacity Value in the ReEDS Capacity Expansion Model: Preprint  

SciTech Connect (OSTI)

An important emerging issue is the estimation of renewables' contributions to reliably meeting system demand, or their capacity value. While the capacity value of thermal generation can be estimated easily, assessment of wind and solar requires a more nuanced approach due to resource variability. Reliability-based methods, particularly, effective load-carrying capacity (ELCC), are considered to be the most robust techniques for addressing this resource variability. The Regional Energy Deployment System (ReEDS) capacity expansion model and other long-term electricity capacity planning models require an approach to estimating CV for generalized PV and system configurations with low computational and data requirements. In this paper we validate treatment of solar photovoltaic (PV) capacity value by ReEDS capacity expansion model by comparing model results to literature for a range of energy penetration levels. Results from the ReEDS model are found to compare well with both comparisons--despite not being resolved at an hourly scale.

Sigrin, B.; Sullivan, P.; Ibanez, E.; Margolis, R.

2014-08-01T23:59:59.000Z

458

Major PM expansion at Universal-Cyclops features new consolidation process  

SciTech Connect (OSTI)

A major expansion of powder-metallurgy facilities at Bridgeville, PA., has been recently announced by Universal-Cyclops Speciality Steel Div., Cyclops Corp. Production capacity for high-temperature alloys initially will be increased to two million pounds. Included in the planned project will be expansion of vacuum-induction melting (VIM), gas atomization, screening, blending, degassing, and handling capabilities. Air-atmosphere sintering furnaces will be installed to consolidate powder preforms by Universal-Cyclops' patented CAP (Consolidation by Atmospheric Pressure) process. Production from the new facility will serve the aircraft gas-turbine market. After chemical activation, the powder is placed in glass molds which are then evacuated and sealed. The filled molds are placed in a refractory container, surrounded by sand, and the entire assembly is heated in conventional air atmosphere electric or gas-fired furnace to temperatures over 2000/degree/F.

Not Available

1981-12-01T23:59:59.000Z

459

Exploring Small-Scale Meat Processing Expansions in Iowa  

E-Print Network [OSTI]

Exploring Small-Scale Meat Processing Expansions in Iowa A Technical Report Submitted@iastate.edu #12;2Exploring Small-Scale Meat Processing Expansions in Iowa April 2011 Overview of Findings Iowa;3Exploring Small-Scale Meat Processing Expansions in Iowa April 2011 Introduction Iowa is a national leader

Debinski, Diane M.

460

NREL: Transmission Grid Integration - Webinars  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

DOE Electricity Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

462

transmission | OpenEI Community  

Open Energy Info (EERE)

21 21 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235321 Varnish cache server transmission Home Kyoung's picture Submitted by Kyoung(155) Contributor 12 November, 2012 - 09:17 Legal Reviews are Underway BHFS Legal review permitting power plant roadmap transmission The legal review of the Regulatory Roadmap flowcharts and supporting content is well underway and will continue for the next several months with our legal team at [www.bhfs.com Brownstein Hyatt Farber and Schreck]. The

463

Lattice-structures and constructs with designed thermal expansion coefficients  

SciTech Connect (OSTI)

A thermal expansion-managed lattice structure having a plurality of unit cells each having flexure bearing-mounted tabs supported on a base and actuated by thermal expansion of an actuator having a thermal expansion coefficient greater than the base and arranged so that the tab is inwardly displaced into a base cavity. The flexure bearing-mounted tabs are connected to other flexure-bearing-mounted tabs of adjacent unit cells so that the adjacent unit cells are spaced from each other to accommodate thermal expansion of individual unit cells while maintaining a desired bulk thermal expansion coefficient of the lattice structure as a whole.

Spadaccini, Christopher; Hopkins, Jonathan

2014-10-28T23:59:59.000Z

464

LANS DB PENSION PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

December 2010 December 2010 u:\my documents\pension plan\revised tcp1 db plan spd dec 2010.doc LANS Defined Benefit Pension Plan Summary Plan Description This Summary Plan Description (SPD) is intended to provide a summary of the principal features of the LANS Defined Benefit Pension Plan ("Plan") and is not meant to interpret, extend or change the Plan in any way. This SPD will continue to be updated. Please check back on a regular basis for the most recent version. Nothing in the Plan and/or this SPD shall be construed as giving any member the right to be retained in service with LANS or any affiliated company, or as a guarantee of any rights or benefits under the Plan. LANS, in its sole discretion, reserves the right to amend the SPD or Plan, or to terminate the Plan, at any time.

465

Knowledge Preconditions for Plans  

Science Journals Connector (OSTI)

......research-article Original Articles Knowledge Preconditions for Plans ERNEST DAVIS...of time and a possible worlds model of knowledge. The definitions strictly subsume previous...semantics of plans|formal theory of knowledge.| Knowledge Preconditions for Plans......

ERNEST DAVIS

1994-10-01T23:59:59.000Z

466

Coiled transmission line pulse generators  

DOE Patents [OSTI]

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

467

Ising expansion for the Hubbard model  

Science Journals Connector (OSTI)

We develop series expansions for the ground state properties of the Hubbard model by introducing an Ising anisotropy into the Hamiltonian. For the two-dimensional square lattice half-filled Hubbard model, the ground state energy, local moment, sublattice magnetization, uniform magnetic susceptibility, and spin stiffness are calculated as a function of U/t, where U is the Coulomb constant and t is the hopping parameter. Magnetic susceptibility data indicate a crossover around U?4 between spin density wave antiferromagnetism and Heisenberg antiferromagnetism. Comparisons with Monte Carlo simulations, random phase approximation result, and mean-field solutions are also made.

Zhu-Pei Shi and Rajiv R. P. Singh

1995-10-01T23:59:59.000Z

468

Accelerating cycle expansions by dynamical conjugacy  

E-Print Network [OSTI]

Periodic orbit theory provides two important functions---the dynamical zeta function and the spectral determinant for the calculation of dynamical averages in a nonlinear system. Their cycle expansions converge rapidly when the system is uniformly hyperbolic but greatly slowed down in the presence of non-hyperbolicity. We find that the slow convergence can be associated with singularities in the natural measure. A properly designed coordinate transformation may remove these singularities and results in a dynamically conjugate system where fast convergence is restored. The technique is successfully demonstrated on several examples of one-dimensional maps and some remaining challenges are discussed.

Ang Gao; Jianbo Xie; Yueheng Lan

2011-06-06T23:59:59.000Z

469

Calculations of Surface Thermal-Expansion  

E-Print Network [OSTI]

, the quasiharmon- ic approximation (plus the Lennard-Jones potential) predicts values of e???which are too large. " The monic approximation (plus the Lennard- Jones poten- 0 20 40 TEMPERATURE T 60 FIG. 9. Surface thermal expansion for Xe. tial) thus tend... to cancel, so that our results are more accurate than those obtained in more rigorous calcu- lations based on the quasihar monic approximation. The bulk results shown in Figs. 1-6 were ob- tained for a slab having a (111)surface orientation...

KENNER, VE; Allen, Roland E.

1973-01-01T23:59:59.000Z

470

Definition: Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Service Service Jump to: navigation, search Dictionary.png Transmission Service Services provided to the Transmission Customer by the Transmission Service Provider to move energy from a Point of Receipt to a Point of Delivery.[1] Related Terms transmission lines, Transmission Customer, Transmission Service Provider, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Service&oldid=480302" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

471

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission...

472

Ebola virus transmission in guinea pigs  

Science Journals Connector (OSTI)

...Rights Reserved. 2014 research-article Ebola virus transmission in guinea pigs Gary...School of Medicine, Philadelphia, PA, USA Ebola virus (EBOV) transmission is currently...movement over short distances. Importance Ebola is generally thought to be spread between...

Gary Wong; Xiangguo Qiu; Jason S. Richardson; Todd Cutts; Brad Collignon; Jason Gren; Jenna Aviles; Carissa Embury-Hyatt; Gary P. Kobinger

2014-11-12T23:59:59.000Z

473

MagLab - Transmission Lines Tutorial  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tweet Education Home > MagLab U > Interactive Tutorials Arrow Transmission Lines More than half a million miles of high-voltage transmission lines criss-cross the United States. If...

474

Transmission Issues and Power Exchanges in Texas  

E-Print Network [OSTI]

on the transmission owning utilities by several parties, primary distribution cooperatives, cogenerators, and large industrial customers, to grant wider access to the system. This pressure is coming at a time when transmission lines are becoming increasingly difficult...

Hughes, H. L.

475

Vibration Transmission through Symmetric Resonant Couplings  

Science Journals Connector (OSTI)

15 March 1994 research-article Vibration Transmission through Symmetric Resonant Couplings D. J. Allwright...Blakemore P. R. Brazier-Smith J. Woodhouse The transmission of vibration through a symmetric junction is considered. The problem is...

1994-01-01T23:59:59.000Z

476

Estes-Flatiron Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

477

EEI/DOE Transmission Capacity Report  

Broader source: Energy.gov (indexed) [DOE]

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

478

Mountain States Transmission Intertie (MSTI) Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

479

Sandia National Laboratories: Transmission Grid Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure Security, Modeling, Modeling & Analysis, News, News & Events, Renewable Energy, SMART Grid, Systems Analysis, Transmission Grid Integration, Wind Energy Sandia...

480

Venus Technology Plan Venus Technology Plan  

E-Print Network [OSTI]

Venus Technology Plan May 2014 #12; ii Venus Technology Plan At the Venus Exploration a Roadmap for Venus Exploration (RVE) that is consistent with VEXAG priorities as well as Planetary Decadal Survey priorities, and (3) develop a Technology Plan for future Venus missions (after a Technology

Rathbun, Julie A.

Note: This page contains sample records for the topic "transmission expansion planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

2013 Planning Cycle  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

482

2014 Planning Cycle  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

483

4865 recreation planning [n  

Science Journals Connector (OSTI)

landsc. plan. pol. recr....(Development of policies, strategies and measures for the provision of recreation areas and facilities; ? urban area recreation planning ...

2010-01-01T23:59:59.000Z

484

Marketing Planning: Feeniks Koulu.  

E-Print Network [OSTI]

??Degree Thesis Marketing Planning: Feeniks Koulu demonstrates structured marketing planning process with the help of case company Feeniks Koulu. The central idea of Thesis is (more)

Raut, Biranjan

2013-01-01T23:59:59.000Z

485

BPA, Electric Transmission Overview, October 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Electric Transmission Overview Electric transmission Electric transmission is the process by which large amounts of...

486

The real problem with Merchant transmission  

SciTech Connect (OSTI)

Current regulatory policy distinguishes transmission investments that have primarily economic benefits from those that primarily enhance reliability. But no such dichotomy exists; congestion and reliability are inter-related in complex ways. Thus, solving the transmission investment problem is more complex than ''fixing'' merchant transmission; investment in the grid must be treated as a systems problem. (author)

Blumsack, Seth; Lave, Lester B.; Ilic, Marija

2008-03-15T23:59:59.000Z

487

Spectral Theory for Nonconservative Transmission Line Networks  

E-Print Network [OSTI]

Spectral Theory for Nonconservative Transmission Line Networks Robert Carlson Department The global theory of transmission line networks with nonconserva- tive junction conditions is developed from is determined. Specialized results are developed for rational graphs. 1 #12;1 Introduction The transmission line

Carlson, Bob

488

Is Hubble's Expansion due to Dark Energy  

E-Print Network [OSTI]

{\\it The universe is expanding} is known (through Galaxy observations) since 1929 through Hubble's discovery ($V = H D$). Recently in 1999, it is found (through Supernovae observations) that the universe is not simply expanding but is accelerating too. We, however, hardly know only $4\\%$ of the universe. The Wilkinson Microwave Anisotropy Probe (WMAP) satellite observational data suggest $73\\%$ content of the universe in the form of dark-energy, $23\\%$ in the form of non-baryonic dark-matter and the rest $4\\%$ in the form of the usual baryonic matter. The acceleration of the universe is ascribed to this dark-energy with bizarre properties (repulsive-gravity). The question is that whether Hubble's expansion is just due to the shock of big-bang & inflation or it is due to the repulsive-gravity of dark-energy? Now, it is believed to be due to dark-energy, say, by re-introducing the once-discarded cosmological-constant $\\Lambda$. In the present paper, it is shown that `the formula for acceleration due to dark-energy' is (almost) exactly of same-form as `the acceleration formula from the Hubble's law'. Hence, it is concluded that: yes, `indeed it is the dark-energy responsible for the Hubble's expansion too, in-addition to the current on-going acceleration of the universe'.

R. C. Gupta; Anirudh Pradhan

2010-10-19T23:59:59.000Z

489

Wien Automatic System Planning (WASP) Package | Open Energy Information  

Open Energy Info (EERE)

Wien Automatic System Planning (WASP) Package Wien Automatic System Planning (WASP) Package Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Wien Automatic System Planning (WASP) Package Agency/Company /Organization: International Atomic Energy Agency Sector: Energy Focus Area: Renewable Energy, Energy Efficiency Topics: Pathways analysis Resource Type: Software/modeling tools Website: www-pub.iaea.org/MTCD/publications/PDF/CMS-16.pdf Cost: Free References: WASP[1] "The WASP-IV code permits finding the optimal expansion plan for a power generating system over a period of up to thirty years, within constraints given by the planner." References ↑ "WASP" Retrieved from "http://en.openei.org/w/index.php?title=Wien_Automatic_System_Planning_(WASP)_Package&oldid=403685

490

Mitigation Action Plans (MAP) and Related Documents | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

December 1, 2010 December 1, 2010 EA-1782: Mitigation Action Plan University of Delaware Lewes Campus Onsite Wind Energy Project September 1, 2010 EIS-0409: Mitigation Action Plan Kemper County Integrated Gasification Combined Cycle Project, Kemper County, Mississippi August 24, 2010 EA-1736: Mitigation Action Plan Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, Los Alamos, New Mexico July 10, 2010 EIS-0026: 2010 Annual Mitigation Report Waste Isolation Pilot Plant June 4, 2010 EA-1704: Mitigation Action Plan Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi January 1, 2010 EA-1755: Mitigation Action Plan

491

DOE Plans Supplemental Environmental Impact Statement for New Petroleum  

Broader source: Energy.gov (indexed) [DOE]

Plans Supplemental Environmental Impact Statement for New Plans Supplemental Environmental Impact Statement for New Petroleum Reserve Site in Mississippi DOE Plans Supplemental Environmental Impact Statement for New Petroleum Reserve Site in Mississippi March 5, 2008 - 10:52am Addthis Three Public Meetings Planned Next Month; Supplemental Study to Include Floodplain and Wetlands Assessments WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced plans to prepare a Supplemental Environmental Impact Statement (SEIS) for the nation's Strategic Petroleum Reserve (SPR) expansion site in Richton, MS. This supplemental study will consider whether to select a new location for new petroleum reserve's raw water intake structure from the Leaf River to an alternate location with greater water availability. The SEIS will also

492

Perturbation Expa]nsion in Dynamical Nuclear Field Theory and Its Relation with Boson Expansion Theory  

Science Journals Connector (OSTI)

......Perturbation Expa]nsion in Dynamical Nuclear Field Theory and Its Relation...April 1990. With the Dynamical Nuclear Field Theory (DNFT) in the...vibrational mode of a spherical nuclear system. Due to the effects...coupling strength and boson energy fails at full self-consistency......

Teruo Kishimoto; Tetsuo Kammuri

1990-09-01T23:59:59.000Z

493

Fact #802: November 4, 2013 Market Share by Transmission Type...  

Energy Savers [EERE]

2: November 4, 2013 Market Share by Transmission Type Fact 802: November 4, 2013 Market Share by Transmission Type The variety of transmission technologies has increased as...

494

Western-UGP Transmission and Ancillary Services Rates Customer...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

80 Percentage of transmission plant included in UMZ Rates (line 79 line 76) TP 1.00000 TRANSMISSION EXPENSES 81 Total transmission expenses (sum lines 41 to 43,...

495

RAPID/BulkTransmission/About | Open Energy Information  

Open Energy Info (EERE)

Contribute Contact Us About Bulk Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry...

496

RAPID/Geothermal/Transmission Siting & Interconnection/Nevada...  

Open Energy Info (EERE)

Siting Agency: Public Utilities Commission of Nevada Transmission Siting Transmission lines over 200 kV are handled by the state's CPCN process. Siting of transmission lines with...

497

Colorado/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Roadmap < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

498

SunZia Southwest Transmission Project Comments  

Broader source: Energy.gov (indexed) [DOE]

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

499

California/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Roadmap < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

500

Arizona/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the