Sample records for transmission expansion planning

  1. Transmission Expansion Planning Using an AC Model ...

    E-Print Network [OSTI]

    Periodicals

    2013-01-02T23:59:59.000Z

    Western Interconnection” under contract DOE-FOA0000068. ... problem to determine locations for placing new transmission ... KNITRO and BONMIN are de

  2. Capricious Cables: Understanding the Key Concepts in Transmission Expansion Planning and Its Models

    SciTech Connect (OSTI)

    Donohoo, P.; Milligan, M.

    2014-06-01T23:59:59.000Z

    The extra-high-voltage transmission network is the bulk transport network of the electric power system. To understand how the future power system may react to planning decisions today, wide-area transmission models are increasingly used to aid decision makers and stakeholders. The goal of this work is to illuminate these models for a broader audience that may include policy makers or relative newcomers to the field of transmission planning. This paper explains the basic transmission expansion planning model formulation. It highlights six of the major simplifications made in transmission expansion planning models and the resulting need to contextualize model results using knowledge from other models and knowledge not captured in the modeling process.

  3. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    SciTech Connect (OSTI)

    Kirby, Brendan J [ORNL

    2006-07-01T23:59:59.000Z

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

  4. Transmission System Expansion Plans in View Point of Deterministic, Probabilistic and Security Reliability Criteria

    E-Print Network [OSTI]

    Transmission System Expansion Plans in View Point of Deterministic, Probabilistic and Security control system as well as reasonable strength of grid originally. Because investment for power system the stability, and dynamic characteristics of the new system. A main reason of the separated work process

  5. A reliability cost-benefit analysis for HVDC transmission expansion planning

    SciTech Connect (OSTI)

    Kuruganty, P.R.S. (Manitoba Hydro, Winnipeg, Manitoba (CA)); Woodford, D.A. (Manitoba HVDC Research Centre, Winnipeg, Manitoba (CA))

    1988-07-01T23:59:59.000Z

    A major portion of Manitoba Hydro's generation is located in the North on the Nelson River. The lower Nelson River generation is brought into the load centre in Southern Manitoba through an HVDC transmission system consisting of two bipoles, the first rated at 1680 MW at the rectifier and the second at 2000 MW. This paper presents the methodology used in arriving at the optimum Bipole 3 size using a reliability cost-benefit analysis. The analysis considers the forced outages of the generation and transmission systems using system outage statistics. The generator and valve group maintenance and the reduction in capability of thyristor valve groups during the summer season were also incorporated in the analysis. The load model used in the study was based on system data for the period 1980-1984. The criterion used in choosing the Bipole 3 size is to optimize the present worth value of the annual energy curtailment due to the HVDC system forced outages and the incremental installation cost of the transmission as the capacity of Bipole 3 is increased. The optimum Bipole 3 size based on the study is 2200 MW. This value is significantly lower than that based on a pole spare criterion used in the earlier development of the HVDC system. Finally, the need for validation of the outage data in evaluating future HVDC projects and the need for data collection and classification is indicated.

  6. Transmission Planning | Department of Energy

    Office of Environmental Management (EM)

    Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

  7. STRATEGIC TRANSMISSION INVESTMENT PLAN

    E-Print Network [OSTI]

    Authors James Bartridge Judy Grau Mark Hesters Don Kondoleon Chuck Najarian Contributing Authors Grace: Bartridge, James, Judy Grau, Mark Hesters, Don Kondoleon, Chuck Najarian. 2007 Strategic Transmission

  8. WINDExchange Offshore Wind Webinar: Transmission Planning and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind WINDExchange Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind...

  9. Marketing Plan for Transmission Planning Services

    E-Print Network [OSTI]

    Tu, Linh

    2006-12-15T23:59:59.000Z

    well because of its people, business market and industry; it is always a good idea to be on the lookout for new markets and clients in other industries and markets. Transmission planning has always been a steady market for the electrical industry...

  10. Geothermal Resources and Transmission Planning

    Broader source: Energy.gov [DOE]

    This project addresses transmission-related barriers to utility-scale deployment of geothermal electric generation technologies.

  11. Transmission Expansion in Argentina 5: The Regional Electricity Forum of Buenos Aires Province

    E-Print Network [OSTI]

    Littlechild, Stephen C; Ponzano, Eduardo A

    ’. In Argentina (and most of Latin America and Spain), this generally includes making rules for a given sector within the framework set by a law and the related decrees issued by the head of the executive branch (the president at federal level, the governors... of renewable energy, 2) acting as the public sector counterpart of private organisations such as FREBA, in this case approving the transmission expansion plan, 3) compiling statistics, 4) issuing technical authorisations to build new facilities within...

  12. Plan to Conduct Electric Transmission Congestion Study: Federal...

    Broader source: Energy.gov (indexed) [DOE]

    Plan to Conduct Electric Transmission Congestion Study: Federal Register Volume 76, No. 218 - Nov. 10, 2011 Plan to Conduct Electric Transmission Congestion Study: Federal Register...

  13. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    2007. “Inclusion of Wind in the MISO Transmission Expansionhttp://www.jcspstudy.org/ Midwest ISO (MISO). 2007. Midwest+Planning Midwest ISO (MISO). 2003. Midwest Transmission

  14. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    SciTech Connect (OSTI)

    Mills, Andrew D.; Wiser, Ryan; Porter, Kevin

    2009-02-02T23:59:59.000Z

    The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS and WinDS). The authors and general location of the 40 detailed transmission studies included in our review are illustrated in Figure ES-1. As discussed in the body of the report, these studies vary considerably in scope, authorship, objectives, methodology, and tools. Though we recognize this diversity and are cognizant that comparisons among these studies are therefore somewhat inappropriate, we nonetheless emphasize such simple comparisons in this report. We do so in order to improve our understanding of the range of transmission costs needed to access greater quantities of wind, and to highlight some of the drivers of those costs. In so doing, we gloss over many important details and differences among the studies in our sample. In emphasizing simple comparisons, our analysis focuses primarily on the unit cost of transmission implied by each of the studies. The unit cost of transmission for wind in $/kW terms on a capacity-weighted basis is estimated by simply dividing the total transmission cost in a study by the total amount of incremental generation capacity (wind and non-wind) modeled in that study. In so doing, this metric assumes that within any individual study all incremental generation capacity imposes transmission costs in proportion to its nameplate capacity rating. The limitations to this approach are described in some detail in the body of the report.

  15. 216-B-3 expansion ponds closure plan

    SciTech Connect (OSTI)

    Not Available

    1994-10-01T23:59:59.000Z

    This document describes the activities for clean closure under the Resource Conservation and Recovery Act of 1976 (RCRA) of the 216-B-3 Expansion Ponds. The 216-B-3 Expansion Ponds are operated by the US Department of Energy, Richland Operations Office (DOE-RL) and co-operated by Westinghouse Hanford Company (Westinghouse Hanford). The 216-B-3 Expansion Ponds consists of a series of three earthen, unlined, interconnected ponds that receive waste water from various 200 East Area operating facilities. The 3A, 3B, and 3C ponds are referred to as Expansion Ponds because they expanded the capability of the B Pond System. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the Bypass pipe (Project X-009). Water discharged to the Bypass pipe flows directly into the 216-B-3C Pond. The ponds were operated in a cascade mode, where the Main Pond overflowed into the 3A Pond and the 3A Pond overflowed into the 3C Pond. The 3B Pond has not received waste water since May 1985; however, when in operation, the 3B Pond received overflow from the 3A Pond. In the past, waste water discharges to the Expansion Ponds had the potential to have contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the dangerous waste portion of mixed waste is regulated under RCRA.

  16. Abstract --The need to determine adequate regulations in the transmission activity in deregulated environments does not

    E-Print Network [OSTI]

    Dixon, Juan

    be followed. Index Terms--Transmission expansion, Transmission planning, Transmission systems, Transmission pricing, Open access. I INTRODUCTION he presence of economies of scale and the specificity

  17. Powering the people: India's capacity expansion plans

    SciTech Connect (OSTI)

    Patel, S.

    2009-05-15T23:59:59.000Z

    India has become a global business power even though hundreds of millions of its citizens still live in poverty. To sustain economic growth and lift its people out of poverty, India needs more and more reliable power. Details of government plans for achieving those goals demonstrate that pragmatism may be in shorter supply than ambition and political will. 1 ref., 12 figs., 1 tab.

  18. Microsoft Word - DOE RFI on Transmission Planning - PGE Comments...

    Energy Savers [EERE]

    approach to guiding development toward appropriate locations within the southern California deserts, while also providing a road map for transmission planning in these regions....

  19. Technology Transfer Expansion Planned UTCA is conducting a major project

    E-Print Network [OSTI]

    Carver, Jeffrey C.

    Technology Transfer Expansion Planned UTCA is conducting a major project to evaluate and extend its technology transfer activities (UTCA project 03217). Steven Jones and David Eckhoff of UAB are working to expand the current technology transfer program to showcase the successes of the UTCA projects. Samples

  20. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    Planning (Xcel). 2006. Wind Integration Study Report OfTransmission Vision for Wind Integration. White Paper.Charles Smith (Utility Wind Integration Group), Lynn Coles (

  1. Classification of the Visual Landscape for Transmission Planning1

    E-Print Network [OSTI]

    Standiford, Richard B.

    . The third concept is that the specific design of transmission towers can result in a negative re- sponseClassification of the Visual Landscape for Transmission Planning1 Curtis Miller2/ , Nargis Jetha3 can be made of the visual change to the landscape due to the introduction of transmission facilities

  2. Abstract--Electric energy transmission is essential for the operation of competitive energy markets. Transmission

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    1 Abstract-- Electric energy transmission is essential for the operation of competitive energy markets. Transmission expansion planning has been defined as a complex combinatorial optimization problem. The model proposed generates expansion plans under the Pareto optimality approach. It shows acceptable

  3. Meter Expansion Plan Existing Multi-Space Meter

    E-Print Network [OSTI]

    Duchowski, Andrew T.

    Meter Expansion Plan 11 35 9 7 10 20 12 11 12 46 23 15 15 60 23 Existing Multi-Space Meter Split Regulations 136 New Multi-Space Meter Visitor Only New Multi-Space Meter Split Regulations KEY 97 Updated 7/8/13 11 5 #12;HAVE.HAVE. UNION DR. 1 2 3 4 5 New Multi-space Meter After: 5 Meter Spaces Regulations

  4. West Elk Mine expansion and degasification plans approved

    SciTech Connect (OSTI)

    NONE

    2008-04-01T23:59:59.000Z

    West Elk Mine recently applied for and received approval for an expansion of its mining and methane drainage operation sin Gunnison County, Colorado. The deliberation over this planned expansion among several federal agencies and other groups received considerable local press coverage. One of the key issues focused on the fate of the additional; methane that would be emitted from the mine's degasification system. This article summarizes this process, which highlights the numerous barriers that still affect many coal mine methane (CMM) project opportunities is the United states. As the debate over climate change legislation moves forward in the US Congress and awareness of greenhouse gas emissions increases around the country, lawmakers, regulators, and non-governmental organizations will continue to focus more attention on CMM reduction opportunities,.

  5. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    SciTech Connect (OSTI)

    Mills, Andrew D.; Phadke, Amol A.; Wiser, Ryan H.

    2010-06-10T23:59:59.000Z

    The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this paper we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33percent of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33percent RE target across nearly all scenarios analyzed (38-65percent). Solar energy is almost always the second largest source (14-41percent). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Further, we find that even with total transmission expenditures of $17-34 billion these costs still represent just 10-19percent of the total delivered cost of renewable energy.

  6. Transmission Expansion Planning with Re-design - Optimization ...

    E-Print Network [OSTI]

    2010-05-17T23:59:59.000Z

    Proof. We show how to write a Steiner-tree graph problem in the form (TEP), by suitably choosing ...... In the objective function above, each penalty factor ph.

  7. Transmission investment and expansion planning in a restructured electricity market

    E-Print Network [OSTI]

    Leung, Ka-Cheong

    such as phase shifting transformers (PST), high-voltage direct-current (HVDC) lines, and other power

  8. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    SciTech Connect (OSTI)

    Mills, Andrew; Phadke, Amol; Wiser, Ryan

    2010-02-16T23:59:59.000Z

    Building transmission to reach renewable energy (RE) goals requires coordination among renewable developers, utilities and transmission owners, resource and transmission planners, state and federal regulators, and environmental organizations. The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this report we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33% of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Of the renewable resources in WREZ resource hubs, and under the assumptions described in this report, our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33% RE target across nearly all scenarios analyzed (38-65%). Solar energy is almost always the second largest source (14-41%). Solar exceeds wind by a small margin only when solar thermal energy is assumed to experience cost reductions relative to all other technologies. Biomass, geothermal, and hydropower are found to represent a smaller portion of the selected resources, largely due to the limited resource quantity of these resources identified within the WREZ-identified hubs (16-23% combined). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Uncertainties and policies that impact bus-bar costs are the most important to evaluate carefully, but factors that impact transmission costs and the relative market value of each renewable option can also be important. Under scenarios in which each load zone must meet 33% of its load with delivered renewable energy from the WREZ-identified resource hubs, the total transmission investment required to meet the 33% west-wide RE target is estimated at between $22 billion and $34 billion. Although a few of the new transmission lines are very long - over 800 miles - most are relatively short, with average transmission distances ranging from 230-315 miles, depending on the scenario. Needed transmission expenditure are found to decline to $17 billion if wide use of renewable energy credits is allowed; consideration of renewable resources outside of WREZ-identified hubs would further reduce this transmission cost estimate. Even with total transmission expenditures of $17-34 billion, however, these costs still represent just 10-19% of the total delivered cost of renewable energy.

  9. SOLVING GENERATION EXPANSION PLANNING PROBLEMS WITH ENVIRONMENTAL CONSTRAINTS BY A BUNDLE METHOD

    E-Print Network [OSTI]

    Solodov, Mikhail V.

    for the construction of new power plants, while ensuring economic and reliable supply to the future electricity demandSOLVING GENERATION EXPANSION PLANNING PROBLEMS WITH ENVIRONMENTAL CONSTRAINTS BY A BUNDLE METHOD discuss the energy generation expansion planning with environmental constraints, formulated as a nonsmooth

  10. WECC releases its first-ever transmission plan for the Western Interconnection

    Broader source: Energy.gov [DOE]

    The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection.

  11. Planning considerations for the intermountain HVDC transmission system

    SciTech Connect (OSTI)

    Lee, R.L.; Beshir, M.J.; Gee, J.H.

    1986-01-01T23:59:59.000Z

    Planning of an HVDC transmission system embedded into an existing ac network may require unique control and converter equipment capability in order to satisfy stability requirements of the network. The planning and design of the Intermountain Power Project HVDC transmission system are based on unique control performance features for power transfers during terminal ac faults, rapid power recovery following fault clearing and utilization of exceptionally high transient overload capability of 2 per unit during the post-fault period to maintain system stability. The Department, in its efforts to meet the Western Systems Coordinating Council's (WSCC) reliability criteria, developed and incorporated into its HVDC specifications very rigorous reliability and availability requirements. One objective of this project was to attain the unusually low bipolar converter system outage frequency goal of one outage in five years to achieve a bipole performance rating equivalent to two ac circuits of similar capability. The reliability goals of this project have provided one of the impetus for revisions to the WSCC Reliability Criteria for System Design. The reliability goals and other features adopted for the Intermountain HVDC transmission system are discussed in this paper and study results are included to demonstrate the effectiveness of various controls implemented as stability enhancement techniques.

  12. Impact of unit commitment constraints on generation expansion planning with renewables

    E-Print Network [OSTI]

    Palmintier, Bryan Stephen

    Growing use of renewables pushes thermal generators against operating constraints - e.g. ramping, minimum output, and operating reserves - that are traditionally ignored in expansion planning models. We show how including ...

  13. ARM - Lesson Plans: Expansion of Population and Environment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc Documentation RUC : XDCResearch Related InformationAcid Rain Outreach HomeExpansion of

  14. OPEC production: Capital limitations, environmental movements may interfere with expansion plans

    SciTech Connect (OSTI)

    Ismail, I.A.H. (Organization of the Petroleum Exporting Countries, Vienna (Austria))

    1994-05-09T23:59:59.000Z

    Obtaining capital is a critical element in the production expansion plans of OPEC member countries. Another issue that may impact the plans is the environmental taxes that may reduce the call on OPEC oil by 5 million b/d in 2000 and about 16 million b/d in the year 2010. This concluding part of a two-part series discusses the expansion possibilities of non-Middle East OPEC members, OPEC's capital requirements, and environmental concerns. Non-Middle East OPEC includes Algeria, Gabon, Indonesia, Libya, Nigeria, and Venezuela.

  15. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    publications.html PG&E. 2007a. WECC Regional PlanningCalifornia Electric: WECC Regional Planning Project,Presentation January 23,2008 WECC Regional Planning Review

  16. Biennial Assessment of the Fifth Power Plan Transmission Issues

    E-Print Network [OSTI]

    unscheduled electricity flows over transmission lines leading to increased risks to electric system by the partners in the Colstrip 500 kV transmission lines (Northwestern Energy, Puget Sound Energy, Portland

  17. Tracking Progress Last updated 06/18/2014 Transmission Expansion 1

    E-Print Network [OSTI]

    issues certificates of public convenience and necessity (CPCNs) for transmission lines at 200 kilovolts of existing transmission lines are issued a notice of exempt construction (NOC) and are exempt from CPUC CEQA

  18. Introduction Framework Multiscale Expansion Axisymmetric Problems FEM Simulations Postprocessing A Transmission Problem in Electromagnetism with a

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    A Transmission Problem in Electromagnetism with a Singular Interface GABRIEL CALOZ 2 MONIQUE DAUGE 2 ERWAN FAOU 2´eron A Transmission Problem in Electromagnetism with a Singular Interface 1 / 33 inria-00528523,version1-22Oct2010 of electromagnetic fields with depth inside the conductor. The Skin Depth : () = 2/µ0 V. P´eron A Transmission

  19. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01T23:59:59.000Z

    Report.pdf Midwest ISO (MISO). 2003. Midwest TransmissionConference September 2007 MISO. 2007. Midwest Transmission2006 SDG&E Midwest ISO (MISO) ISO/RTO February 2007 MISO '06

  20. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    2006. Transmission and Wind Energy: Capturing the Prevailingand Renewable Energy (Wind & Hydropower Technologiesand Renewable Energy Wind & Hydropower Technologies Program

  1. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    Interconnectivity.degree of network interconnectivity; and the level of studyof Transmission Network Interconnectivity A number of the

  2. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    NREL/CP-500-35969. Global WindPower Conference. Chicago,Transmission Projects. ” Windpower 2007 Conference. Los

  3. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    value for all renewable resource and load zone combinationsvalue for all renewable resource and load zone combinationsidentify attractive renewable resources and the transmission

  4. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    from existing state renewable energy policy requirements,for renewable energy to different assumptions and policiesrenewable energy procurement, technology cost, transmission, and policy

  5. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    from existing state renewable energy policy requirements,renewable energy procurement, technology cost, transmission, and policypolicies (including renewable development and energy

  6. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    2006. Transmission and Wind Energy: Capturing the Prevailing40 6.2 20% Wind Energy: Wind Deployment System (and Renewable Energy (Wind & Hydropower Technologies

  7. Department of Industrial Engineering Fall 2011 Transmission Component Reverse Engineering and Process Planning

    E-Print Network [OSTI]

    Demirel, Melik C.

    PENNSTATE Department of Industrial Engineering Fall 2011 Transmission Component Reverse Engineering to fabricate the parts in the Industrial Engineering Department Factory for Advanced Manufacturing Education of the transmission to reverse engineer and develop process plans for efficient fabrication in a low volume setting

  8. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    of incremental wind development. At the extreme, still otherextreme assumption, the implied unit cost of transmission for windon wind power in their analysis. On one extreme, a number of

  9. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  10. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-04-01T23:59:59.000Z

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  11. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    500 and 230 kV 765 kV and 800 kV HVDC 500 and 230 kV 500 kVmi) 138 and 345 kV 345 kV 345 kV 345 kV and HVDC 345kV and HVDC 345 kV 345 kV Note: Total transmission cost is

  12. Transmission Planning Process and Opportunities for Utility-Scale Solar Engagement within the Western Electricity Coordinating Council (WECC)

    SciTech Connect (OSTI)

    Hein, J.; Hurlbut, D.; Milligan, M.; Coles, L.; Green, B.

    2011-11-01T23:59:59.000Z

    This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. Market barriers unrelated to technology often limit the expansion of utility-scale solar power, even in areas with exceptional resource potential. Many of these non-technical barriers have to do with policy, regulation, and planning, and hardly ever do they resolve themselves in a timely fashion. In most cases, pre-emptive intervention by interested stakeholders is the easiest way to remove/address such barriers, but it requires knowing how to navigate the institutional waters of the relevant agencies and boards. This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. It focuses on the Western Interconnection (WI), primarily because the quality of solar resources in the Southwest makes utility-scale concentrating solar power (CSP) and photovoltaics (PV) economically feasible, and because the relevant institutions have evolved in a way that has opened up opportunities for removing non-technical market barriers. Developers will find in this report a high-level field manual to identify the venues for mitigating and possibly eliminating systemic market obstacles and ensuring that the economic playing field is reasonably level. Project-specific issues such as siting for transmission and generation resources are beyond the scope of this report. Instead, the aim is to examine issues that pervasively affect all utility-scale PV and CSP in the region regardless of where the project may be. While the focus is on the WI, many of the institutions described here also have their counterparts in the Eastern and the Texas interconnections. Specifically, this report suggests a number of critical engagement points relating to generation and transmission planning.

  13. Alternative Economic Criteria and Proactive Planning for Transmission Investment in Deregulated Power Systems

    E-Print Network [OSTI]

    Oren, Shmuel S.

    Alternative Economic Criteria and Proactive Planning for Transmission Investment in Deregulated as the economic objective of connecting load areas to remote cheap generation resources. This was done within for pricing and return on investments have increased the burden of economic justification for investment

  14. Review of Jamaica Public Service Company, Ltd. least-cost expansion plan.

    SciTech Connect (OSTI)

    Koritarov, V.; Buehring, W.; Cirillo, R.; Decision and Information Sciences

    2008-02-28T23:59:59.000Z

    Argonne National Laboratory has been asked to review the least-cost expansion plan (LCEP) of the Jamaica Public Service Company, Ltd. (JPSCo). The material that has been initially provided to Argonne included: (1) An electronic copy of the data and results from JPSCo's running the WASP electric system expansion planning model, (2) Approximately 20 pages of a document 'JPSCo Generation Expansion Plan', marked 'DRAFT 002', date unknown, and (3) The report 'JPSCo Least Cost Generation Expansion Plans, (1999-2009)', January 1999. It was noticed that the 20 pages from the 'DRAFT 002' document were different from the January 1999 report. An explanation was provided to Argonne that the excerpt was from an earlier draft and that the review should focus on the January 1999 report. Further, the electronic copy of the WASP case did not correspond to either the January 1999 report or to the 20-page excerpt. Again, the reason for these discrepancies was that the WASP case provided to Argonne was an earlier case and not the final one that was presented in the report. Based on the review of the available material, Argonne experts have prepared and submitted to the National Investment Bank of Jamaica (NIBJ) a preliminary draft report containing the initial findings, comments, questions and observations. As many of the comments and questions raised in the preliminary review needed to be discussed with the appropriate staff of JPSCo and other Jamaican experts, a 3-day mission to Jamaica was carried out by one Argonne expert (V. Koritarov) in the period July 20-23, 1999. Besides JPSCo experts, the discussions and the review of the LCEP during the mission included several experts from NIBJ, Ministry of Energy, and the Petroleum Corporation of Jamaica. Mr. Koritarov also worked with the JPSCo technical staff to reconstruct the WASP base case that was used as a basis for the January 1999 report. The first step was to verify that the results obtained after the resimulation of this case were identical to those presented in the January 1999 report. Then, in the next step, the Argonne expert and JPSCo team reviewed this case in detail and performed certain modifications and improvements of data where necessary. These modifications and data adjustments resulted in a new base case that served as a basis for further review and for the sensitivity analyses. Several sensitivity analyses were performed together with JPSCo experts and the results were discussed with the JPSCo management and other Jamaican experts at the end of the mission. Additional sensitivity analyses, as well as the cases for high and low load forecasts, were conducted by Mr. Koritarov after returning from Jamaica. The main findings of the review and issues that have been discussed with the Jamaican team can be summarized.

  15. Energy-water analysis of the 10-year WECC transmission planning study cases.

    SciTech Connect (OSTI)

    Tidwell, Vincent Carroll; Passell, Howard David; Castillo, Cesar; Moreland, Barbara

    2011-11-01T23:59:59.000Z

    In 2011 the Department of Energy's Office of Electricity embarked on a comprehensive program to assist our Nation's three primary electric interconnections with long term transmission planning. Given the growing concern over water resources in the western U.S. the Western Electricity Coordinating Council (WECC) requested assistance with integrating water resource considerations into their broader electric transmission planning. The result is a project with three overarching objectives: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western Interconnection to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Western States Water Council (WSWC) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and WSWC. The foundation for the Energy-Water DSS is Sandia National Laboratories Energy-Power-Water Simulation (EPWSim) model (Tidwell et al. 2009). The modeling framework targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. This framework provides an interactive environment to explore trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., state, county, watershed, interconnection). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. The framework currently supports modules for calculating water withdrawal and consumption for current and planned electric power generation; projected water demand from competing use sectors; and, surface and groundwater availability. WECC's long range planning is organized according to two target planning horizons, a 10-year and a 20-year. This study supports WECC in the 10-year planning endeavor. In this case the water implications associated with four of WECC's alternative future study cases (described below) are calculated and reported. In future phases of planning we will work with WECC to craft study cases that aim to reduce the thermoelectric footprint of the interconnection and/or limit production in the most water stressed regions of the West.

  16. DRAFT WORKING PAPER JULY 2006 DO NOT QUOTE OR CITE Topological Elements of Transmission Pricing and Planning

    E-Print Network [OSTI]

    Blumsack, Seth

    DRAFT WORKING PAPER ­ JULY 2006 ­ DO NOT QUOTE OR CITE 1 Topological Elements of Transmission Pricing and Planning Seth Blumsack, Lester B. Lave, and Marija Ili Carnegie Mellon University, Pittsburgh

  17. Planning electricity transmission to accommodate renewables: Using two-stage programming to evaluate flexibility and the cost of disregarding uncertainty

    E-Print Network [OSTI]

    van der Weijde, Adriaan Hendrik; Hobbs, Benjamin F.

    2011-01-31T23:59:59.000Z

    We develop a stochastic two-stage optimisation model that captures the multistage nature of electricity transmission planning under uncertainty and apply it to a stylised representation of the Great Britain (GB) network. In our model, a proactive...

  18. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    SciTech Connect (OSTI)

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01T23:59:59.000Z

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  19. Abstract-Electricity transmission planning does not have a common solution worldwide, with most countries trusting on

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    Abstract- Electricity transmission planning does not have a common solution worldwide, with most-growing conditions of the Chilean energy market, driven by private agents, meant the need to introduce changes issue in the restructuring of the electricity market all over the world. Transmission systems costs

  20. The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.

    E-Print Network [OSTI]

    Wiser, Ryan

    2014-01-01T23:59:59.000Z

    Examples in Europe. Renewable Energy 33, no. 8 (August):mission Expansion and Renewable Energy Policies . DiscussionS tory So F ar . National Renewable Energy Laboratory. NREL/

  1. Transmission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for Transmission ,...

  2. Abstract--This paper proposes an optimization based method of planning reactive power control for electric transmission

    E-Print Network [OSTI]

    Kumar, Ratnesh

    1 Abstract--This paper proposes an optimization based method of planning reactive power control for electric transmission systems to endow them with the capability of being reconfigured to a secure planning, reactive power control, reconfiguration, voltage stability. I. INTRODUCTION PPROPRIATE long

  3. State Environmental Policy Act (SEPA) Environmental Checklist Form 216-B-3 Expansion Ponds Closure Plan. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-12-01T23:59:59.000Z

    The 216-B-3 Expansion Ponds Closure Plan (Revision 1) consists of a Part A Dangerous Waste Permit Application and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. The 216-B-3 Pond System consists of a series of four earthen, unlined, interconnected ponds and the 216-B-3-3 Ditch that receive waste water from various 200 East Area operating facilities. These four ponds, collectively. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the 216-B-3-3 Ditch. Water discharged to the 216-8-3-3 Ditch flows directly into the 216-B-3 Pond. In the past, waste water discharges to B Pond and the 216-B-3-3 Ditch contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the nonradioactive dangerous portion of mixed waste is regulated under RCRA. Mixed waste also may be considered a hazardous substance under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) when considering remediation of waste sites.

  4. Abstract--Transmission expansion in fast growing economies imposes severe challenges to electricity markets, given the need

    E-Print Network [OSTI]

    Dixon, Juan

    to electricity markets, given the need for planning and executing major midterm investments in an environment, renewable energy, renewable integration, electricity regulation I. INTRODUCTION EALING with uncertainty has and provision of voltage/reactive power support resources in order to tackle the short and medium term

  5. A Game-Theoretic Model for Generation Expansion Planning: Problem Formulation and Numerical Comparisons

    E-Print Network [OSTI]

    Varaiya, Pravin

    power industry in the United States is being restructured with the passage of recent regulation by the Federal Energy Regulatory Commission (FERC). Sev- eral states have proposed plans to restructure considerations such as plant capacity limitations and energy balance constraints. Similarly to [9], Cournot style

  6. Flexible Transmission in the Smart Grid

    E-Print Network [OSTI]

    Hedman, Kory Walter

    2010-01-01T23:59:59.000Z

    Planning . 102 vi Transmission Line Maintenance Scheduling 103 Just-in-time Transmission 103 Flexible Transmission in the Smart Grid

  7. The DOE Office of Environmental Management International Cooperative Program: Current Status and Plans for Expansion

    SciTech Connect (OSTI)

    Gerdes, Kurt D.; Han, Ana M.; Marra, James C.; Fox, Kevin M.; Peeler, David K.; Smith, Michael E.; Jannik, Gerald T.; Farfan, Eduardo B.; Kim, Dong-Sang; Vienna, John D.; Roach, Jay; Aloy, A. S.; Stefanovsky, S. V.; Bondarkov, M. D.; Lopukh, D. P.; Kim, Chenwoo

    2009-01-15T23:59:59.000Z

    The DOE-EM Office of Engineering and Technology is responsible for implementing EM’s international cooperative program. The Office of Engineering and Technology’s international efforts are aimed at supporting EM’s mission of risk reduction and accelerated cleanup of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To do this, EM pursues collaborations with government organizations, educational institutions, and private industry to identify and develop technologies that can address the site cleanup needs of DOE. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute (KRI) and the SIA Radon Institute in Russia and the Ukraine’s International Radioecology Laboratory (IRL). Additionally, a task was recently completed with the Nuclear Engineering Technology Institute (NETEC) in South Korea. The objectives of these collaborations were to explore issues relating to high-level waste and to investigate technologies that could be leveraged to support EM site cleanup needs. In FY09, continued collaboration with the current partners is planned. Additionally, new research projects are being planned to expand the International Program. A collaborative project with Russian Electrotechnical University is underway to evaluate CCIM control and monitoring technologies. A Statement of Intent was recently signed between DOE-EM and the U.K. Nuclear Decommissioning Authority (NDA) to work cooperatively on areas of mutual interest. Under this umbrella, discussions were held with NDA representatives to identify potential areas for collaboration. Information and technical exchanges were identified as near-term actions to help meet the objectives of the Statement of Intent. Technical exchanges in identified areas are being pursued in FY09

  8. Progress Report on Power Division Work Plan

    E-Print Network [OSTI]

    technologies · Data development for the WECC/TEPPC 2020 transmission assessment 7 #12;Bonneville · Resource of adequacy methodology · Work with WECC and NERC on assessments 9 #12;Demand Response & Smart Grid · Review · Participation in WECC Transmission Expansion Planning Policy Committee (TEPPC) ­ Provided PNW load forecast

  9. Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01T23:59:59.000Z

    Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

  10. California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning

    SciTech Connect (OSTI)

    Eto, Joseph; Stovall, John P.

    2003-04-01T23:59:59.000Z

    The California Energy Commission directed the Consortium for Electric Reliability Technology Solutions to analyze possible future scenarios for the California electricity system and assess transmission research and development (R&D) needs, with special emphasis on prioritizing public-interest R&D needs, using criteria developed by the Energy Commission. The scenarios analyzed in this report are not predictions, nor do they express policy preferences of the project participants or the Energy Commission. The public-interest R&D needs that are identified as a result of the analysis are one input that will be considered by the Energy Commission's Public Interest Energy Research staff in preparing a transmission R&D plan.

  11. > PAPER FOR THE SPECIAL SECTION ON TRANSMISSION INVESTMENT, PRICING AND CONSTRUCTION economic perspective, the appropriate

    E-Print Network [OSTI]

    --From an economic perspective, the appropriate criterion for assessing the merits of a transmission investment, it must be capable of evaluating the economic impacts on the various effected stakeholders and account. Index Terms--Market power, network expansion planning, power system economics, power transmission

  12. Department of Energy Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors

    Broader source: Energy.gov [DOE]

    The Department has decided that, prior to issuing a report that designates any national interest electric transmission corridor, the Department will first issue any designation that it is considering in draft form, so as to allow additional opportunities for review and comment by affected States, regional entities, and the general public.

  13. Introduction Uniform Estimates for Transmission Problems 3D Multiscaled Asymptotic Expansion Numerical Simulations Skin-Effect Description in Electromagnetism with a

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Numerical Simulations Skin-Effect Description in Electromagnetism with a Scaled Asymptotic Expansion Gabriel.08.2009 V. P´eron Skin-Effect Description in Electromagnetism with a Scaled Asymptotic Expansion 1 / 32 and Electromagnetism MONIQUE DAUGE, ERWAN FAOU, VICTOR P ´ERON (2009) Asymptotic Behavior at High Conductivity of Skin

  14. 1406 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 4, NOVEMBER 2007 Market-Based Coordination of Transmission

    E-Print Network [OSTI]

    Fu, Yong

    with competitive generation capacity planning in electricity markets. The purpose of the model is a holistic simulation of generation and transmission capacity expansion in the market environment. The solution a joint energy and transmission auction market and a capacity mechanism. The joint auction market enables

  15. Regional Transmission Projects: Finding Solutions

    SciTech Connect (OSTI)

    The Keystone Center

    2005-06-15T23:59:59.000Z

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

  16. VI Symposium of Specialists in Electric Operational and Expansion Planning -VI SEPOPE, May 24-29,1998, Bahia, Brazil POWER SYSTEM PLANNING IN THE SOUTH AMERICA

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    the execution of a few macro projects, capital intensive, with high impact on the economic development of each country, and where their revenues depend on the local conditions and the development of future projects in infrastructure development and the required regulations in the energy field. It describes how the planning

  17. STRATEGIC TRANSMISSION INVESTMENT PLAN

    E-Print Network [OSTI]

    Bartridge Judy Grau Mark Hesters Don Kondoleon Chuck Najarian Principal Authors Grace Anderson Clare Please use the following citation for this report: Bartridge, James, Judy Grau, Mark Hesters, Don

  18. STRATEGIC TRANSMISSION INVESTMENT PLAN

    E-Print Network [OSTI]

    Smith, Advisor James Bartridge Judy Grau Mark Hesters Don Kondoleon Clare Laufenberg Gallardo James Mc

  19. 10-Yr. Transmission Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNGExperience hands-on halloweenReliable solar:2 OF

  20. EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Plan

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

  1. Current conflicts in U.S. Electric transmission planning, cost allocation and renewable energy policies: More heat than light?

    SciTech Connect (OSTI)

    Bloom, David; Forrester, J. Paul; Klugman, Nadav

    2010-12-15T23:59:59.000Z

    To surmount obstacles to expanding and upgrading the nation's transmission system that are impeding development of the renewables sector, it is critical that these issues be resolved quickly and on a consistent rather than ad hoc basis. (author)

  2. Abstract--The transmission system plays an essential role in the new deregulated scenario. Aspects such as planning are

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    countries in Latin America such as Argentina, Peru, Bolivia and Colombia followed these changes [1. · Energy prices determined by the congestion of the transmission system's lines are impacted. II

  3. China petrochemical expansion progressing

    SciTech Connect (OSTI)

    Not Available

    1991-08-05T23:59:59.000Z

    This paper reports on China's petrochemical expansion surge which is picking up speed. A worldscale petrochemical complex is emerging at Shanghai with an eye to expanding China's petrochemical exports, possibly through joint ventures with foreign companies, China Features reported. In other action, Beijing and Henan province have approved plans for a $1.2 billion chemical fibers complex at the proposed Luoyang refinery, China Daily reported.

  4. Designing electricity transmission auctions

    E-Print Network [OSTI]

    Greve, Thomas; Pollitt, Michael G.

    2012-10-26T23:59:59.000Z

    The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

  5. On Integrating Theories of International Economics in the Strategic Planning of Global Supply Chains and Dynamic Supply Chain Reconfiguration with Capacity Expansion and Contraction

    E-Print Network [OSTI]

    Lee, Chaehwa

    2012-02-14T23:59:59.000Z

    that incorporating them in the form of readily available individual competitiveness indicators in OR/MS models offers promise to enhance decision-support for the strategic planning of global supply chains in general, and for locating facilities in particular...

  6. Transmission Planning | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomenthe House Committee on EnergyEnergyThe sun risesThe U.S.Modernizing America's

  7. Federal Register Notice: Plan for Conduct of 2012 Electric Transmissio...

    Energy Savers [EERE]

    Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study...

  8. EIS-0231: Navajo Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned...

  9. Transmission Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Return to Daylight Saving Time Posted: 2232015 Effective Date: 382015 This document provides the procedure for reserving and scheduling transmission that spans the time change...

  10. Great Plains Wind Energy Transmission Development Project

    SciTech Connect (OSTI)

    Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

    2012-06-09T23:59:59.000Z

    In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

  11. Transmission Services J7000

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Business Unit - J7300 CRSP - DSW - RMR Open Access Transmission Tariff Management Transmission Service Requests Interconnection Requests OASIS...

  12. ARM - Lesson Plans: Thermal Expansion of Water

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc Documentation RUC : XDCResearch Related InformationAcid RainThe Pacific and El Niño

  13. Integrated Energy-Water Planning in the Western and Texas Interconnections

    SciTech Connect (OSTI)

    Vincent Tidwell; John Gasper; Robert Goldstein; Jordan Macknick; Gerald Sehlke; Michael Webber; Mark Wigmosta

    2013-07-01T23:59:59.000Z

    While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliability Council of Texas) with western water planners (Western Governors’ Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.

  14. Transmission INTRODUCTION

    E-Print Network [OSTI]

    , to a significant degree, on a well-functioning wholesale power market. The transmission system is integral the consequences of a poorly designed wholesale power market, and the Council does not want to see those Regulatory Commission began taking actions to further facilitate competition in wholesale power supply. Today

  15. Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1990-09-01T23:59:59.000Z

    For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

  16. Transmission Workshop

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof theRestorationAdvisoryManagement andTopKnow? |Transmission

  17. Transmission Policy in the United States

    E-Print Network [OSTI]

    Joskow, Paul

    2006-03-14T23:59:59.000Z

    Market Design (SMD) proposal. PJM’s market rules and transmission pricing, planning and investment policies are reviewed as an articulation of FERC’s RTO and SMD visions....

  18. Midwest Transmission Workshop III Summary

    SciTech Connect (OSTI)

    Kevin Bryan

    2003-03-12T23:59:59.000Z

    OAK-B135 On March 12-13, 2002, the National Wind Coordinating Committee (NWCC), in cooperation with regional stakeholders, held a two-day workshop: Planning for Electrical Transmission Needs in the Upper Midwest. The workshop was the outgrowth of an effort to develop a forum and process for consideration of transmission options that strives for equitable allocation of benefits and impacts among all affected parties. The goal of this workshop was to provide a catalyst for an enhanced, inclusive process for transmission planning with participation of and acceptance by all affected stakeholders. Participants in the meeting included representatives of state and regional regulatory agencies, utilities and power generators, the wind industry, environmental and landowner interests, and other interested parties (see Attachment A for a list of meeting participants).

  19. Bibliography on transmission access issues

    SciTech Connect (OSTI)

    Lankford, C.B. [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States)] [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States); McCalley, J.D. [Iowa State Univ., Ames, IA (United States)] [Iowa State Univ., Ames, IA (United States); Saini, N.K. [Entergy Services Corp., Metairie, LA (United States)] [Entergy Services Corp., Metairie, LA (United States)

    1996-02-01T23:59:59.000Z

    This paper presents a bibliography on issues related to transmission access in electric power systems. There are 233 citations referenced in this bibliography. This bibliography presents a collection of selected literature on issues related to transmission access. It does not contain all of the material available on this subject or the categories contained herein. Some readers may feel that citations within this bibliography should be strictly limited to transmission system issues and not include energy pricing or reliability issues. However, it was the decision of the Subcommittee of the IEEE Task Force on Transmission Access and Nonutility Generation that selected entries relating to reliability and energy pricing, most relevant to transmission access, should be included. This decision was made because certain issues relating to reliability, transmission and energy pricing are perceived by the industry to be critical in the discussion of transmission access. The bibliography has been divided into the following sections or sub-sections: 2.0 Operational (Engineering) Issues, 3.0 Planning, 4.0 Reliability, 5.1 Economics: Costing, 5.2(a) Economics: Location-Differentiated Pricing, 5.2(b) Economics: Time-Differentiated Pricing, 5.3 Economics: Brokering, Bidding, and Auctioning, 6.0 Regulatory, and 7.0 General. Although the content of many publications spanned two or more of these sections, the desire to limit document length required that all publications be placed in the single most appropriate section. Publications are sorted according to author or publication resource.

  20. Optoelectronics 514 Transmission Hologram Transmission Hologram

    E-Print Network [OSTI]

    Collins, Gary S.

    Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

  1. NREL: Transmission Grid Integration - Transmission Planning and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions andData and ResourcesOtherForecasting NRELResearch

  2. Energy Planning for Progressive Estimation in Multihop Sensor Networks

    E-Print Network [OSTI]

    Huang, Yi; Hua, Yingbo

    2009-01-01T23:59:59.000Z

    routing tree establishment, transmission energy plan- ninglarge gap of energy between the single-hop tree and therouting tree finding and the transmis- sion energy planning

  3. Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York)

    Broader source: Energy.gov [DOE]

    Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and...

  4. Static gas expansion cooler

    DOE Patents [OSTI]

    Guzek, J.C.; Lujan, R.A.

    1984-01-01T23:59:59.000Z

    Disclosed is a cooler for television cameras and other temperature sensitive equipment. The cooler uses compressed gas ehich is accelerated to a high velocity by passing it through flow passageways having nozzle portions which expand the gas. This acceleration and expansion causes the gas to undergo a decrease in temperature thereby cooling the cooler body and adjacent temperature sensitive equipment.

  5. Penn State Engineering Search for 6 Faculty Positions Dean's Frontier Faculty As part of a plan for substantial expansion of the faculty in both core and emerging fields, the Penn

    E-Print Network [OSTI]

    Maranas, Costas

    and imaging; nanomanufacturing; additive manufacturing; new materials for sustainability and enhanced Advanced Manufacturing for Medical and Mechanical Sciences: bioprinting; biomedical sensing, devices will be determined during the hiring process. Additional information about these positions and the College's plan

  6. Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    SciTech Connect (OSTI)

    Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

    2011-02-01T23:59:59.000Z

    The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

  7. Management Plan Management Plan

    E-Print Network [OSTI]

    ; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

  8. Incorporating HVDC power transmission into system planning

    SciTech Connect (OSTI)

    Not Available

    1980-01-01T23:59:59.000Z

    Thirty papers were presented at the meeting. A separate abstract was prepared for each paper for Energy Research Abstracts (ERA); 5 abstracts are included in Energy Abstracts for Policy Analysis (EAPA). (LCL)

  9. Transportation Center Seminar........ "Proactive Transmission Planning in

    E-Print Network [OSTI]

    Bustamante, Fabián E.

    as exogenous and locational marginal prices are obtained as endogenous variables of the model. The model solves Location: Transportation Center, Chambers Hall Lower Level, 600 Foster St., Evanston Abstract: One

  10. Recovery Act Interconnection Transmission Planning | Department...

    Office of Environmental Management (EM)

    integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the...

  11. Interconnection Transmission Planning: Awards | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA,Fermi NationalBusinessDepartment of EnergyDr. Holdren, WhiteOnList

  12. Transmission Business Unit Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

  13. Merchant transmission investment

    E-Print Network [OSTI]

    Joskow, Paul L.

    2003-01-01T23:59:59.000Z

    We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

  14. AIAA 20030185 Aerodynamically Controlled Expansion

    E-Print Network [OSTI]

    Texas at Arlington, University of

    undesirable over-expansion in generalized supersonic nozzle flows. Nomenclature A cross-sectional area fgAIAA 2003­0185 Aerodynamically Controlled Expansion Nozzle for STOVL Aircraft D.A. Terrier Lockheed Controlled Expansion Nozzle for STOVL Aircraft Douglas A. Terrier* Lockheed Martin Aeronautics Company, Fort

  15. Load regulating expansion fixture

    DOE Patents [OSTI]

    Wagner, L.M.; Strum, M.J.

    1998-12-15T23:59:59.000Z

    A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils is disclosed. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components. 1 fig.

  16. Load regulating expansion fixture

    DOE Patents [OSTI]

    Wagner, Lawrence M. (San Jose, CA); Strum, Michael J. (San Jose, CA)

    1998-01-01T23:59:59.000Z

    A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components.

  17. Concurrent Wind Cooling in Power Transmission Lines

    SciTech Connect (OSTI)

    Jake P Gentle

    2012-08-01T23:59:59.000Z

    Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

  18. Incorporating endogenous demand dynamics into long-term capacity expansion power system models for Developing countries

    E-Print Network [OSTI]

    Jordan, Rhonda LeNai

    2013-01-01T23:59:59.000Z

    This research develops a novel approach to long-term power system capacity expansion planning for developing countries by incorporating endogenous demand dynamics resulting from social processes of technology adoption. ...

  19. Power transmission investment analysis: a new financial Evaluation framework for South Africa

    SciTech Connect (OSTI)

    Maboke, Silky Ntombifuthi; Kachienga, Michael Ogembo

    2008-05-15T23:59:59.000Z

    A proposed framework for power transmission expansion projects in South Africa incorporates the modeling of project options and uncertainties, Monte Carlo simulations, real option analysis, and decision analysis, based on a foundation of strategic analysis. (author)

  20. Transmission Commercial Project Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

  1. Electric utility system master plan

    SciTech Connect (OSTI)

    Erickson, O.M.

    1992-10-01T23:59:59.000Z

    This publication contains the electric utility system plan and guidelines for providing adequate electric power to the various facilities of Lawrence Livermore National Laboratory in support of the mission of the Laboratory. The topics of the publication include general information on the current systems and their operation, a planning analysis for current and future growth in energy demand, proposed improvements and expansions required to meet long range site development and the site`s five-year plan.

  2. Warp Drive With Zero Expansion

    E-Print Network [OSTI]

    Jose Natario

    2002-03-13T23:59:59.000Z

    It is commonly believed that Alcubierre's warp drive works by contracting space in front of the warp bubble and expanding space behind it. We show that this expansion/contraction is but a marginal consequence of the choice made by Alcubierre, and explicitly construct a similar spacetime where no contraction/expansion occurs. Global and optical properties of warp drive spacetimes are also discussed.

  3. The early planning and development of Oklahoma City

    E-Print Network [OSTI]

    Humphreys, Blair D. (Blair David)

    2009-01-01T23:59:59.000Z

    An analysis of the planning, development, and implementation of Oklahoma City's Grand Boulevard. In the early days of 1909, a plan emerged to build an expansive parks and boulevard system to encircle Oklahoma City. Such ...

  4. Automated manual transmission controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

    1999-12-28T23:59:59.000Z

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  5. Final Report on Transmission Pricing in the Western Interconnection

    SciTech Connect (OSTI)

    Douglas C. Larson; Lawrence Nordell

    2003-06-25T23:59:59.000Z

    Under this project, the Committee on Regional Electric Power Cooperation (CREPC) of the Western Interstate Energy Board developed a ''western pricing and congestion management proposal'' in order to foster efficient wholesale power markets and efficient use and expansion of the transmission grid. Drafts of this paper provided useful information to states/provinces in the Western Interconnection as Western Regional Transmission Organization (RTO) transmission pricing proposals have continued to evolve. Throughout the project there has been a gradual, but incomplete agreement on pricing systems to be used by RTOs in the West.

  6. CAMPUS MASTER PLAN CLEMSON UNIVERSITY 2002

    E-Print Network [OSTI]

    Duchowski, Andrew T.

    plant does not utilize the most current technologies and & DAVIS * SEAMON, WHITESIDE & ASSOCIATES, INC. * MCCRACKEN & LOPEZ, P.A.74 Water EXISTING WATER significant funding and should be added to the existing expansion plans. Specific areas are highlighted below

  7. SAGEWASP. Optimal Electric Utility Expansion

    SciTech Connect (OSTI)

    Clark, P.D.II; Ullrich, C.J. [Lakeland Electric and Water, FL (United States)

    1989-10-10T23:59:59.000Z

    SAGE-WASP is designed to find the optimal generation expansion policy for an electrical utility system. New units can be automatically selected from a user-supplied list of expansion candidates which can include hydroelectric and pumped storage projects. The existing system is modeled. The calculational procedure takes into account user restrictions to limit generation configurations to an area of economic interest. The optimization program reports whether the restrictions acted as a constraint on the solution. All expansion configurations considered are required to pass a user supplied reliability criterion. The discount rate and escalation rate are treated separately for each expansion candidate and for each fuel type. All expenditures are separated into local and foreign accounts, and a weighting factor can be applied to foreign expenditures.

  8. Residential construction on expansive soils

    E-Print Network [OSTI]

    Phipps, James Frederick

    1993-01-01T23:59:59.000Z

    Residences founded on expansive soils experience billions of dollars each year in damage caused by the heaving and shrinking of the foundation soils. It is thought that stiffening the foundation, while increasing the cost of the home, will save...

  9. Series Transmission Line Transformer

    DOE Patents [OSTI]

    Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

    2004-06-29T23:59:59.000Z

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  10. Electric Transmission Lines (Nebraska)

    Broader source: Energy.gov [DOE]

    The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway crossings. This section contains general regulations...

  11. Patterns of transmission investment

    E-Print Network [OSTI]

    Joskow, Paul L.

    2005-01-01T23:59:59.000Z

    This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

  12. Collaborative Transmission Technology Roadmap

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    techniques, and tools to analyze data from power quality recorders Size-up demand response opportunities Transmission level monitoring with PMUs is not sufficient and needs to...

  13. EC Transmission Line Risk Identification and Analysis

    SciTech Connect (OSTI)

    Bigelow, Tim S [ORNL

    2012-04-01T23:59:59.000Z

    The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

  14. OMV studies ethylene expansion in Germany

    SciTech Connect (OSTI)

    NONE

    1996-10-23T23:59:59.000Z

    OMV(Vienna) is evaluating plans to debottleneck its ethylene plant at Burghausen from 310,000 m.t./year to at least 400,000 m.t./year. Senior v.p. Jochen Berger says OMV is studying the limits to which the cracker can be expanded. {open_quotes}We`re pretty sure we can go to 400,000 m.t./year, but in two months we`ll have a better idea,{close_quotes} says Berger. The expansion will also depend on the future requirements of downstream operations at the Burghausen site, which include OMV plastics subsidiary PCD`s high-density polyethylene and polypropylene units and the vinyl chloride monomer and polyvinyl chloride units operated by Hoechst-Wacker joint venture Vinnolit.

  15. Transmission Line Security Monitor

    ScienceCinema (OSTI)

    None

    2013-05-28T23:59:59.000Z

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  16. Transmission Enhancement Technology Report

    E-Print Network [OSTI]

    of Existing Transmission 6 5. Potential New Equipment to Improve Transmission Capability 9 6. Potential New parties for the sites that should be studied as potential locations for new generation and to consult lignite and wind energy. " As per the requirements of the above-referenced Congressional direction

  17. Business plan proposal

    E-Print Network [OSTI]

    Kucera, Carolyn

    1991-01-01T23:59:59.000Z

    about you and your business. The following guideline has been provided to ensure that important points are included in the executive summary. Your business may believe that other information may be pertinent to the completion of the agribusiness plan..., partnership, corporation), if it is a merchandising, processing, or service related business. Is it a new business? an expansion? or a relocation? If it is a relocation, where are you currently located? Trace the history of your business: when was it formed...

  18. 127 Natural Gas Transmission and Distribution Module

    E-Print Network [OSTI]

    Key Assumptions

    and border prices, end-use prices, and flows of natural gas through a regional interstate representative pipeline network, for both a peak (December through March) and off-peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of the supply options available to bring gas to market centers within each of the NGTDM regions (Figure 9). The major assumptions used within the NGTDM are grouped into four general categories. They relate to (1) structural components of the model, (2) capacity expansion and pricing of transmission and distribution services, (3) Arctic pipelines, and (4) imports and exports. A complete listing of NGTDM assumptions and in-depth

  19. Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    SciTech Connect (OSTI)

    Fink, S.; Rogers, J.; Porter, K.

    2010-07-01T23:59:59.000Z

    This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

  20. Mirror Film Company Has 'Concentrated' Plans for Expansion |...

    Broader source: Energy.gov (indexed) [DOE]

    10, 2010 - 1:19pm Addthis Lorelei Laird Writer, Energy Empowers In concentrating solar power, glass is king-but it's fighting to hold on to its crown. The reflectivity of...

  1. Alliance moves forward with expansion plans in Kentucky

    SciTech Connect (OSTI)

    Buchsbaum, L.

    2008-09-15T23:59:59.000Z

    General Mine Contracting's work for Alliance's Elk Creek and Warrior preparation plants, and the River View mine is described. 4 photos.

  2. Financial Analysis of Electric Sector Expansion Plans (FINPLAN) | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power Basics (TheEtelligence (Smart GridHomeFederatedCity Corporation

  3. EIS-0411: Transmission Agency of Northern California Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

  4. Electric Transmission Lines (Iowa)

    Broader source: Energy.gov [DOE]

    Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

  5. Down hole transmission system

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

    2007-07-24T23:59:59.000Z

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

  6. Transmission Services Bulletin

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Standard Time On the first Sunday in November Transmission Services sets clocks from Daylight Savings Time (PD) back to Standard Time (PS). At 02:00 the time becomes 01:00. In...

  7. Transmission Grid Integration

    Broader source: Energy.gov [DOE]

    The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

  8. Integrated Transmission and Distribution Control

    SciTech Connect (OSTI)

    Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

    2013-01-16T23:59:59.000Z

    Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

  9. National Electric Transmission Congestion Study Webinars | Department...

    Broader source: Energy.gov (indexed) [DOE]

    National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

  10. Honda Transmission Technical Center

    High Performance Buildings Database

    Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

  11. Bulk Power Transmission Study

    E-Print Network [OSTI]

    John, T.

    BULK POWER TRANSMISSION STUDY TOMMY JOH~ P. E. Manager of Resource Recovery Waste Management of North America, Inc. Houston, Texas Texans now have a choice. We can become more efficient and maintain our standard of living, or we can... continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled...

  12. Abstract --The growth of non-conventional renewable energies involves a new challenge for optimal network expansion. A better

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    and implementation of policies to develop Non-Conventional Renewable Energies (NCRE), they can be seen as a mechanism for the harmonious development of the expansion network. From the economic viewpoint, NCREs usually are considered development or equipment repowering within a coordinated network expansion investment plan, both in AC

  13. Collaborative Transmission Technology Roadmap

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and bring together organizations with broadly-shared goals but potentially very different corporate cultures, strategic plans, and legal mandates, neither document Back to Table of...

  14. Hybrid Transmission Corridor study

    SciTech Connect (OSTI)

    Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

    1992-06-01T23:59:59.000Z

    Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

  15. Calculate thermal-expansion coefficients

    SciTech Connect (OSTI)

    Yaws, C.L. [Lamar Univ., Beaumont, TX (United States)

    1995-08-01T23:59:59.000Z

    To properly design and use process equipment, an engineer needs a sound knowledge of physical and thermodynamic property data. A lack of such knowledge can lead to design or operating mistakes that can be dangerous, costly or even fatal. One useful type of property data is the thermal-expansion coefficient. This article presents equations and tables to find the thermal-expansion coefficients of many liquids that contain carbon. These data are useful in process-engineering applications, including the design of relief systems which are crucial to safeguarding process equipment. Data are provided for approximately 350 compounds. A computer software program, which contains the thermophysical property data for all of the compounds discussed in this article, is available for $43 prepaid from the author (Carl L. Yaws, Box 10053, Lamar University, beaumont, TX 77710; Tel. 409-880-8787; fax 409-880-8404). The program is in ASCII format, which can be accessed by most other types of computer software.

  16. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

    1991-08-27T23:59:59.000Z

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

  17. Abriendo Puertas Expansion Management Model

    E-Print Network [OSTI]

    Beifuss, Patricia; Blum, Megean; Broussard, Sarah; Gregory, Heather; Hooper, Erin; Kravitz, Kelly; Mitchell, William; Swanson, Effie; Tolman, Lauren; Valdez, Maritza

    2011-01-01T23:59:59.000Z

    and Weaknesses Objectives and Goals 36 SITUATION ANALYSIS The foundation of a successful marketing plan is the situation analysis. A situation analysis allows Abriendo Puertas to evaluate the nonprofit?s internal and external environments through a SWOT...

  18. Transmission line capital costs

    SciTech Connect (OSTI)

    Hughes, K.R.; Brown, D.R.

    1995-05-01T23:59:59.000Z

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  19. Low Frequency Transmission Final Project Report

    E-Print Network [OSTI]

    to HVDC transmission and conventional AC transmission in different configurations. The issue is quite

  20. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    PLANNING Guiding Principles Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory,...

  1. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

    1993-01-01T23:59:59.000Z

    A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  2. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

    1997-01-01T23:59:59.000Z

    A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

  3. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1997-03-25T23:59:59.000Z

    A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

  4. Omega Transmission Lines

    E-Print Network [OSTI]

    Vehmas, Joni

    2013-01-01T23:59:59.000Z

    In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

  5. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1993-03-23T23:59:59.000Z

    A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  6. PYRAMID LAKE RENEWEABLE ENERGY PLAN

    SciTech Connect (OSTI)

    HIGH DESERT GEOCULTURE, LLC

    2009-06-06T23:59:59.000Z

    The Pyramid Lake Renewable Energy Plan covers these areas: energy potential (primarily focusing on geothermal resource potential, but also more generally addressing wind energy potential); renewable energy market potential; transmission system development; geothermal direct use potential; and business structures to accomplish the development objectives of the Pyramid Lake Paiute Tribe.

  7. Indian Policy and Westward Expansion

    E-Print Network [OSTI]

    Malin, James Claude

    1921-11-01T23:59:59.000Z

    and the in vestigation of his activity on that committee led to a study of Indian policy in the Trans-Mississippi Valley and its relation to the westward movement. This latter problem, begun as a phase of Atchison's career in the Senate, de veloped into one... policy and its relation to westward expansion now furnish a frame-work upon which the history of the Trans-Mississippi Valley before the Civil War may be written. The period is given a unity otherwise impossible and a foundation is laid upon which...

  8. Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Office of Engineering.

    1992-05-01T23:59:59.000Z

    For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA's Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

  9. Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Office of Engineering.

    1992-05-01T23:59:59.000Z

    For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA`s Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

  10. Gyrification from constrained cortical expansion

    E-Print Network [OSTI]

    Tuomas Tallinen; Jun Young Chung; John S. Biggins; L. Mahadevan

    2015-03-12T23:59:59.000Z

    The exterior of the mammalian brain - the cerebral cortex - has a conserved layered structure whose thickness varies little across species. However, selection pressures over evolutionary time scales have led to cortices that have a large surface area to volume ratio in some organisms, with the result that the brain is strongly convoluted into sulci and gyri. Here we show that the gyrification can arise as a nonlinear consequence of a simple mechanical instability driven by tangential expansion of the gray matter constrained by the white matter. A physical mimic of the process using a layered swelling gel captures the essence of the mechanism, and numerical simulations of the brain treated as a soft solid lead to the formation of cusped sulci and smooth gyri similar to those in the brain. The resulting gyrification patterns are a function of relative cortical expansion and relative thickness (compared with brain size), and are consistent with observations of a wide range of brains, ranging from smooth to highly convoluted. Furthermore, this dependence on two simple geometric parameters that characterize the brain also allows us to qualitatively explain how variations in these parameters lead to anatomical anomalies in such situations as polymicrogyria, pachygyria, and lissencephalia.

  11. Drill string transmission line

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

    2006-03-28T23:59:59.000Z

    A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

  12. The Implications of CEQA: You Better Plan For It

    E-Print Network [OSTI]

    Handy, Susan L.

    Solar- Merced County Specific Plan- Fremont Prison Expansion- San Diego Hollywood Central Park Process Required for EIR's not for IS/MND's Required when: 1) Roadway project 2) Statewide, regional

  13. Patterns of Transmission Investment

    E-Print Network [OSTI]

    Joskow, Paul

    2006-03-14T23:59:59.000Z

    long term performance contracts with a developer of an HVDC transmission link to expand “interconnection” capacity between TSOs with no or limited interconnections and with large sustained differences in prices. Merchant investments supported... truly separate AC networks. For example, by building HVDC inter-connectors between two separate networks, opportunities to increase trades of power from high price to low priced areas can be exploited. The HVDC link between the England and France...

  14. DOE Transmission Workshop

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Deliciouscritical_materials_workshop_presentations.pdf MoreProgramofContract at itsSelections for ReducingTransmission

  15. Regulations for Gas Transmission Lines Less than Ten Miles Long (New York)

    Broader source: Energy.gov [DOE]

    Any person who wishes to construct a gas transmission line that is less than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of...

  16. Abductive Reasoning, Belief Expansion and Nonmonotonic Consequence \\Lambda

    E-Print Network [OSTI]

    Pagnucco, Maurice

    Abductive Reasoning, Belief Expansion and Nonmonotonic Consequence \\Lambda Maurice Pagnucco Abhaya operator known as abductive expansion which adds abductive inference to the belief expansion process. They develop rationality postulates for abductive belief expansion and provide a construction in terms

  17. Boardman to Hemingway Transmission Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

  18. Transmission Issues Policy Steering Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Business Practices CommitteesTeams Joint Operating Committee Transmission Issues Policy Steering Committee Customer Training Interconnection Notices Rates Standards of...

  19. Central Wind Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities: Revised Edition

    SciTech Connect (OSTI)

    Rogers, J.; Porter, K.

    2011-03-01T23:59:59.000Z

    The report and accompanying table addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America. The first part of the table focuses on electric utilities and regional transmission organizations that have central wind power forecasting in place; the second part focuses on electric utilities and regional transmission organizations that plan to adopt central wind power forecasting in 2010. This is an update of the December 2009 report, NREL/SR-550-46763.

  20. Accelerated expansion from cosmological holography

    E-Print Network [OSTI]

    van Putten, Maurice H P M

    2015-01-01T23:59:59.000Z

    It is shown that holographic cosmology implies an evolving Hubble radius $c^{-1}\\dot{R}_H = -1 + 3\\Omega_m$ in the presence of a dimensionless matter density $\\Omega_m$ scaled to the closure density $3H^2/8\\pi G$, where $c$ denotes the velocity of light and $H$ and $G$ denote the Hubble parameter and Newton's constant. It reveals a dynamical dark energy and a sixfold increase in gravitational attraction to matter on the scale of the Hubble acceleration. It reproduces the transition redshift $z_t\\simeq 0.4$ to the present epoch of accelerated expansion and is consistent with $(q_0,(dq/dz)_0)$ of the deceleration parameter $q(z)=q_0+(dq/dz)_0z$ observed in Type Ia supernovae.

  1. EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona

    Broader source: Energy.gov [DOE]

    Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

  2. Automated manual transmission clutch controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

    1999-11-30T23:59:59.000Z

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  3. Cosmic Growth History and Expansion History

    E-Print Network [OSTI]

    Linder, Eric V.

    2009-01-01T23:59:59.000Z

    of the expansion history dark energy equation of state,and growth history constraints on the dark energy equationand growth history constraints on the dark energy equation

  4. Generation capacity expansion in restructured energy markets.

    E-Print Network [OSTI]

    Nanduri, Vishnuteja

    2009-01-01T23:59:59.000Z

    ??With a significant number of states in the U.S. and countries around the world trading electricity in restructured markets, a sizeable proportion of capacity expansion… (more)

  5. Energy Infrastructure Events and Expansions Infrastructure Security...

    Broader source: Energy.gov (indexed) [DOE]

    Year-in-Review: 2010 Energy Infrastructure Events and Expansions Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy Reliability U.S....

  6. Expansion analyses of strategic petroleum reserve in Bayou Choctaw : revised locations.

    SciTech Connect (OSTI)

    Ehgartner, Brian L.; Park, Byoung Yoon

    2010-11-01T23:59:59.000Z

    This report summarizes a series of three-dimensional simulations for the Bayou Choctaw Strategic Petroleum Reserve. The U.S. Department of Energy plans to leach two new caverns and convert one of the existing caverns within the Bayou Choctaw salt dome to expand its petroleum reserve storage capacity. An existing finite element mesh from previous analyses is modified by changing the locations of two caverns. The structural integrity of the three expansion caverns and the interaction between all the caverns in the dome are investigated. The impacts of the expansion on underground creep closure, surface subsidence, infrastructure, and well integrity are quantified. Two scenarios were used for the duration and timing of workover conditions where wellhead pressures are temporarily reduced to atmospheric pressure. The three expansion caverns are predicted to be structurally stable against tensile failure for both scenarios. Dilatant failure is not expected within the vicinity of the expansion caverns. Damage to surface structures is not predicted and there is not a marked increase in surface strains due to the presence of the three expansion caverns. The wells into the caverns should not undergo yield. The results show that from a structural viewpoint, the locations of the two newly proposed expansion caverns are acceptable, and all three expansion caverns can be safely constructed and operated.

  7. Transmission - Contact Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler TinaContact-Information-Transmission Sign In About |

  8. Transmission Capacity Forum

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler TinaContact-Information-Transmission Sign In About

  9. Transmission Contact Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler TinaContact-Information-Transmission Sign In

  10. Transmission Developers Inc.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for' % ~ Transmission

  11. Transmission and Storage Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for' %Transmission and

  12. Electricity Transmission, A Primer

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatementNOTElectricity Transmission System

  13. Transmission Right Of Way

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layered NbS2Topo II: AnTraining andfordefault SignTransmissionAbout

  14. Transmission SEAB Presentation

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of EnergyProgram2-26 Date: March 2, 2012Department ofTransmissionOvercoming

  15. Abstract --Under a context of transmission open access, a methodology to define a common transmission trunk system

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    Terms--Transmission systems, Transmission pricing, Cooperative games, Shapley value, Transmission open

  16. Colorado Electrical Transmission Grid

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2012-02-01T23:59:59.000Z

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Xcel Energy Publication Date: 2012 Title: Colorado XcelEnergy NonXcel Transmission Network Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains transmission network of Colorado Spatial Domain: Extent: Top: 4540689.017558 m Left: 160606.141934 m Right: 758715.946645 m Bottom: 4098910.893397m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shapefile

  17. Delayed Linear Expansion of Two Ultra-low Expansion Dental Stones

    E-Print Network [OSTI]

    Oppedisano, Michael

    2013-12-20T23:59:59.000Z

    The purpose of this study was to measure the linear setting expansion of two ultra-low expansion dental stones used in definitive cast/ prosthesis fabrication which claim to have very low to no setting expansion. Five specimens of each material...

  18. Matched asymptotic expansions in financial engineering

    E-Print Network [OSTI]

    Howison, Sam

    Matched asymptotic expansions in financial engineering Sam Howison OCIAM and Nomura Centre of the approach in `plain vanilla' option valuation, in valuation using a fast mean-reverting-stochastic expansions applied directly to stochastic processes of diffusion type is also proposed. Keywords: option

  19. Multipole Expansion Model in Gravitational Lensing

    E-Print Network [OSTI]

    T. Fukuyama; Y. Kakigi; T. Okamura

    1997-01-31T23:59:59.000Z

    Non-transparent models of multipole expansion model and two point-mass model are analyzed from the catastrophe theory. Singularity behaviours of $2^n$-pole moments are discussed. We apply these models to triple quasar PG1115+080 and compare with the typical transparent model, softened power law spheroids. Multipole expansion model gives the best fit among them.

  20. AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION

    Broader source: Energy.gov [DOE]

    The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

  1. Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission

    E-Print Network [OSTI]

    , there has been significant progress in both areas. The Western Electricity Coordinating Council (WECC) has and significant progress in the last five years. Both regional and WECC-wide organizations have been created

  2. Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA,Fermi NationalBusinessDepartment of EnergyDr. Holdren,

  3. Plan to Conduct Electric Transmission Congestion Study: Federal Register

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15, 2010Energy6 Frontera STAT.PaulThe

  4. Transmission Planning: Institutional Issues in the West | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for' % ~

  5. DOE Action Plan Addressing the Electricity Transmission System

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTS AVAILABLEReport 2009SiteMajor Maintenance atT A * S H I E L

  6. Incorporating Demand Response into Western Interconnection Transmission Planning

    E-Print Network [OSTI]

    Satchwell, Andrew

    2014-01-01T23:59:59.000Z

    Environmental Energy Technologies Division July 2013 Theprograms types: pricing with enabling technology, pricingwithout enabling technology, direct load control,

  7. 10 Year Transmission Plan for the Western Electricity Interconnection

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment( Sample of Shipment Notice)1021 --MaterialsReleased | Department of

  8. Interconnection-Wide Transmission Planning Initiative: Topic A,

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 U.S. Department ofAbout FEMP

  9. Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 U.S. Department ofAbout FEMPAmong States in

  10. Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 U.S. Department ofAbout FEMPAmong States

  11. Interconnection-Wide Transmission Planning Initiative: Topic B, State

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 U.S. Department ofAbout FEMPAmong StatesAgency

  12. Federal Register Notice: Plan for Conduct of 2012 Electric Transmission

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA, GA5 &ofDepartment of EnergyEnergy(from left toCongestion Study

  13. Microsoft Word - Impact_DSR_on_Transmission_Planning_Final.docx

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't32 Master EMAZINFOEnvironmental Assessment forI I D D

  14. Recovery Act Interconnection Transmission Planning | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen OwnedofDepartmentEnergyFrequency | Department ofMay 14, 2014 The sunATheView

  15. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    Investments in the WECC. ” The Electricity Journal 22(9):Coordinating Council (WECC). In Section 3 we examine theannual energy demand in the WECC with new RE for a target

  16. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    Investments in the WECC. ” The Electricity Journal 22(9):when unbundled RECs are allowed on a WECC-wide basis.renewable energy costs WECC-wide by using RECs is found to

  17. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    series for both the renewable resource and the load producedvalue of different renewable resources, and to rank thosefactor of the renewable resource, and financing parameters—

  18. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    augmented with a capacity market payment that is separate92/kW-yr. Recent forward capacity market auctions in ISO-Newzone within PJM. Forward capacity markets, however, are only

  19. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    Modeling utility-scale wind power plants. Part 2: CapacityIf the same wind plant were to deliver its power to a load

  20. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    Modeling utility-scale wind power plants. Part 2: CapacityIf the same wind plant were to deliver its power to a load

  1. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    we focus only on WREZ renewable resources). The remainder ofvalue of different renewable resources, and to rank thoseof any of the renewable resources in fifty-five WREZ hubs to

  2. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    23 GW of non-WREZ renewable resource potential consists of5.1 Non-WREZ Renewable Resources (GW) State or Province ABattractiveness of renewable resources to load zones in the

  3. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    renewable energy developers, utility planners, environmental organizations, and several federal agencies.

  4. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    for deployment of solar thermal in the southwest UnitedGeothermal Wind Wet Cooled Solar Thermal with StorageWet Cooled Solar Thermal without Storage Dry Cooled Solar

  5. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    a small margin only when solar thermal energy is assumed tofor WY wind and AZ solar thermal with storage for thecost for geothermal, wind, and solar thermal with storage

  6. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    renewable resources as the avoided cost of the alternativethe renewable resource. The avoided cost of the alternativelocation, the avoided energy cost must be considered based

  7. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    renewable resources as the avoided cost of the alternativethe renewable resource. The avoided cost of the alternativelocation, the avoided energy cost must be considered based

  8. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    Corp. , 2010. Eastern Wind Integration and Transmissionexpansion is limited, wind integration costs are assumed toof wind (BPA, 2009). Wind integration costs in the U.S. are

  9. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    Corp. , 2010. Eastern Wind Integration and Transmissionof wind (BPA, 2009). Wind integration costs in the U.S. are2009). A recent wind integration study that evaluated up to

  10. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    Arizona, Nevada, and California rely on solar energy to meetVariability of Solar Power. Berkeley, California: LawrenceSolar Photovoltaic Electricity Production. Berkeley, California:

  11. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    from southern California solar and geothermal resources andwind and solar from southern California. The technology thatVariability of Solar Power. Berkeley, California: Lawrence

  12. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    geothermal, biomass, and hydropower). Finally, Olson etthe contributions of hydropower, biomass, and geothermal dothe contribution of hydropower, biomass, and geothermal

  13. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    consists of biomass and hydropower resources. The technologyBiomass, geothermal, and hydropower are found to represent acost of Washington (WA) hydropower under the competitive

  14. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    Colorado: National Renewable Energy Laboratory. http://Colorado: National Renewable Energy Laboratory. NREL/SR-550-Finn, J. 2009. Western Renewable Energy Zones, Phase 1: QRA

  15. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    Colorado: National Renewable Energy Laboratory. NREL/SR-Decisions in the Western Renewable Energy Zone Initiative.Finn, J. 2009. Western Renewable Energy Zones, Phase 1: QRA

  16. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    The value of compressed air energy storage with wind inBlack & Veatch Compressed air energy storage Combined-cycleplant and adding compressed air energy storage (CAES) with a

  17. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    Hild. 2004. “The Value of Wind Energy as a Function of Wind2: Capacity credit. ” Wind Energy 3(4): 167–206. Milligan,Energy (DOE). 2008. 20% Wind Energy by 2030: Increasing Wind

  18. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    Energy (TWh/yr) Salt Lake City San Diego San Francisco/Bay AreaEnergy From Each Resource (TWh/yr) El Paso Salt Lake City Sacramento Reno Portland San Diego San Francisco/Bay Area

  19. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    or federal tax incentives for renewable energy are allowedtax incentives, and acceptance of renewable energy credits (

  20. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    or federal tax incentives for renewable energy are allowedor federal tax incentives for renewable energy are allowedtax incentives, and acceptance of renewable energy credits (

  1. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew D

    2011-01-01T23:59:59.000Z

    Case Category: Case Name: HVDC Long Lines High Utilizationa What if lower unit cost HVDC lines were used for longof renewable technologies? a HVDC lines were assumed to have

  2. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    zone in the Base case, the HVDC Long Lines case, and the RECselection to meet 33% RE WECC-wide in the HVDC Long LinesREC Base Case Short Line HVDC Long Lines Equal Solar Finance

  3. Strategic Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a single BPA data repository * Data quality improvements * Improve model alignment with WECC planning data * Improve WECC base case coordination * Align the BPA data model with...

  4. Direct current power transmission systems

    SciTech Connect (OSTI)

    Padiyar, K.R.

    1991-01-01T23:59:59.000Z

    This book represents text on HVDC transmission available. It deals with the various aspects of the state of the art in HVDC transmission technology. This book presents many aspects of interactions of AC/DC systems. Modeling and analysis of DC systems are also discussed in detail.

  5. HVDC power transmission technology assessment

    SciTech Connect (OSTI)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

    1997-04-01T23:59:59.000Z

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  6. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    cost levelized using 15% per year levelizing factor (3) Energycost levelized using 15% per year levelizing factor (3) Energy

  7. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01T23:59:59.000Z

    the full capacity of the wind power plant at all times. Theto wind projects than to conventional power plants. Thecoal plants) can be leveraged to efficiently move wind power

  8. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    focused approach, a new wind generator located near theallow the output of the wind generator to displace the power

  9. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    turbines and compressed air energy storage for supplementalresources and compressed air energy storage (CAES). Energy

  10. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    pdf/0554(2008).pdf European Wind Energy Association (EWEA).Large Scale Integration of Wind Energy in the European PowerPrepared by the European Wind Energy Association. http://

  11. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    Assumptions to the Annual Energy Outlook 2008. Washington,by the EIA in its Annual Energy Outlook (AEO), as well as tocost, which in the Annual Energy Outlook 2008 was assumed to

  12. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    and areas of high wind potential, using (wherever possible)Wind by 2030 Calss 4-7 Wind Potential (GW) Region 1 Region 2with large amounts of potential wind energy development, but

  13. Project Fever - Fostering Electric Vehicle Expansion in the Rockies

    SciTech Connect (OSTI)

    Swalnick, Natalia

    2013-06-30T23:59:59.000Z

    Project FEVER (Fostering Electric Vehicle Expansion in the Rockies) is a part of the Clean Cities Community Readiness and Planning for Plug-in Electric Vehicles and Charging Infrastructure Funding Opportunity funded by the U.S. Department of Energy (DOE) for the state of Colorado. Tasks undertaken in this project include: Electric Vehicle Grid Impact Assessment; Assessment of Electrical Permitting and Inspection for EV/EVSE (electric vehicle/electric vehicle supply equipment); Assessment of Local Ordinances Pertaining to Installation of Publicly Available EVSE;Assessment of Building Codes for EVSE; EV Demand and Energy/Air Quality Impacts Assessment; State and Local Policy Assessment; EV Grid Impact Minimization Efforts; Unification and Streamlining of Electrical Permitting and Inspection for EV/EVSE; Development of BMP for Local EVSE Ordinances; Development of BMP for Building Codes Pertaining to EVSE; Development of Colorado-Specific Assessment for EV/EVSE Energy/Air Quality Impacts; Development of State and Local Policy Best Practices; Create Final EV/EVSE Readiness Plan; Develop Project Marketing and Communications Elements; Plan and Schedule In-person Education and Outreach Opportunities.

  14. Key-shift transmission

    SciTech Connect (OSTI)

    Nemoto, S.

    1989-03-07T23:59:59.000Z

    A key-shift transmission is described, characterized by the speed-change shaft being divided into a pair of trough-shaped shaft halves each having an arched inner surface which defines a part of a cylindrical bore extending axially through the speed-change shaft thereby the shaft being formed into a hollow shaft, and by each of the shaft halves including a pair of flattened end surfaces which extend axially of each shaft half at both sides of the inner surface, one of the end surfaces having thereon an axially elongated projection and the other of the end surfaces having herein an axially elongated recess of a depth smaller than the height of the projection. The pair of shaft halves are engaged to each other co-rotatably by fitting the projections of the respective shaft halves into the recesses of the respective shaft halves so as to form in an outer surface of the speed-change shaft a pair of elongated axial grooves which are located radially outwardly of the elongated projections of the respective shaft halves and between the flattened end surfaces of the respective shaft halves. A pair of the shift keys are disposed within the pair of elongated axial grooves.

  15. Design Under Uncertainty Employing Stochastic Expansion Methods

    E-Print Network [OSTI]

    Non-intrusive polynomial chaos expansion (PCE) and stochastic collocation (SC) meth- ods and ability to produce functional representations of stochastic variability. PCE estimates coefficients with both techniques for general probabilistic analysis problems. Once PCE or SC representations have been

  16. Low expansion superalloy with improved toughness

    DOE Patents [OSTI]

    Smith, D.F.; Stein, L.I.; Hwang, I.S.

    1995-06-20T23:59:59.000Z

    A high strength, low coefficient of thermal expansion superalloy exhibiting improved toughness over a broad temperature range down to about 4 K is disclosed. The composition is adapted for use with wrought superconducting sheathing.

  17. Major Business Expansion Bond Program (Maine)

    Broader source: Energy.gov [DOE]

    The Major Business Expansion Bond Program provides long-term, credit-enhanced financing up to $25,000,000 at taxable bond rates for businesses creating or retaining at least 50 jobs; up to $10,000...

  18. NWCC Transmission Case Study III

    SciTech Connect (OSTI)

    Terry Allison, Steve Wiese

    2000-03-01T23:59:59.000Z

    OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

  19. Brain choline concentration: early quantitative marker of ischemia and infarct expansion

    E-Print Network [OSTI]

    Karaszewski, B.; Thomas, R.G.R.; Chappell, F.M.; Armitage, P.A.; Carpenter, T.K.; Lymer, G.K.S.; Dennis, M.S.; Marshall, I.; Wardlaw, J.M.

    –28) there were 108 infarct "non-expansion” voxels and 113 infarct "expansion” voxels (of which 80 were “complete expansion” and 33 “partial expansion” voxels). Brain choline concentration increased for each change in expansion category from "non-expansion", via...

  20. Energy Transmission and Infrastructure

    SciTech Connect (OSTI)

    Mathison, Jane

    2012-12-31T23:59:59.000Z

    The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

  1. Secretary Chu Celebrates Expansion of Lithium-Ion Battery Production...

    Office of Environmental Management (EM)

    Celebrates Expansion of Lithium-Ion Battery Production in North Carolina Secretary Chu Celebrates Expansion of Lithium-Ion Battery Production in North Carolina July 26, 2011 -...

  2. Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    15eswise2012p.pdf More Documents & Publications Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production Expansion of Novolyte Capacity for Lithium Ion Electrolyte...

  3. Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    15eswise2011p.pdf More Documents & Publications Expansion of Novolyte Capacity for Lithium Ion Electrolyte Production Expansion of Novolyte Capacity for Lithium Ion Electrolyte...

  4. Heat Flow Database Expansion for NGDS Data Development, Collection...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Heat Flow Database Expansion for NGDS Data Development, Collection and Maintenance (SMU) Heat Flow Database Expansion for NGDS Data Development, Collection and Maintenance (SMU)...

  5. AC and DC power transmission

    SciTech Connect (OSTI)

    Not Available

    1985-01-01T23:59:59.000Z

    The technical and economic assessment of AC and DC transmission systems; long distance transmission, cable transmission, system inter-connection, voltage support, reactive compensation, stabilisation of systems; parallel operation of DC links with AC systems; comparison between alternatives for particular schemes. Design and application equipment: design, testing and application of equipment for HVDC, series and shunt static compensated AC schemes, including associated controls. Installations: overall design of stations and conductor arrangements for HVDC, series and shunt static AC schemes including insulation co-ordination. System analysis and modelling.

  6. Electrical transmission line diametrical retainer

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

    2004-12-14T23:59:59.000Z

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

  7. Midwest Transmission Workshop I Summary

    SciTech Connect (OSTI)

    Kevin Bryan

    2001-05-01T23:59:59.000Z

    OAK-B135 The meeting was opened with a review of the purposes of the workshop: (1) Present and discuss key studies and assessments of transmission upgrades, additions and related issues for the upper Midwest, including work that addresses the full range of views on these topics; (2) Understand the various transmission issues in the upper Midwest and discuss options for addressing the issues; and (3) Identify the decision makers and entities that need to play an active role if transmission issues are to be resolved, and agree on next steps for engaging these individuals and organizations through education, outreach, and information dissemination.

  8. Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues

    SciTech Connect (OSTI)

    Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

    2008-07-01T23:59:59.000Z

    California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

  9. Effects of restraint on expansion due to delayed ettringite formation

    SciTech Connect (OSTI)

    Bouzabata, Hassina [Universite de Toulouse, UPS, INSA, LMDC (Laboratoire Materiaux et Durabilite des Constructions), 135, avenue de Rangueil, F-31 077 Toulouse Cedex 04 (France); Laboratoire Materiaux et Durabilite des Constructions, Department of Civil Engineering, University of Constantine (Algeria); Multon, Stephane, E-mail: multon@insa-toulouse.fr [Universite de Toulouse, UPS, INSA, LMDC (Laboratoire Materiaux et Durabilite des Constructions), 135, avenue de Rangueil, F-31 077 Toulouse Cedex 04 (France); Sellier, Alain [Universite de Toulouse, UPS, INSA, LMDC (Laboratoire Materiaux et Durabilite des Constructions), 135, avenue de Rangueil, F-31 077 Toulouse Cedex 04 (France); Houari, Hacene [Laboratoire Materiaux et Durabilite des Constructions, Department of Civil Engineering, University of Constantine (Algeria)

    2012-07-15T23:59:59.000Z

    Delayed ettringite formation (DEF) is a chemical reaction that causes expansion in civil engineering structures. The safety level of such damaged structures has to be reassessed. To do this, the mechanical conditions acting on DEF expansions have to be analysed and, in particular, the variation of strength with expansion and the effect of restraint on the DEF expansion. This paper highlights several points: DEF expansion is isotropic in stress-free conditions, compressive stresses decrease DEF expansion in the direction subjected to restraint and lead to cracks parallel to the restraint, and expansion measured in the stress-free direction of restrained specimens is not modified. Thus restraint causes a decrease of the volumetric expansion and DEF expansion under restraint is anisotropic. Moreover, the paper examines the correlation between DEF expansion and concrete damage, providing data that can be used for the quantification of the effect of stresses on DEF induced expansion.

  10. Video transmission over wireless networks

    E-Print Network [OSTI]

    Zhao, Shengjie

    2005-08-29T23:59:59.000Z

    Compressed video bitstream transmissions over wireless networks are addressed in this work. We first consider error control and power allocation for transmitting wireless video over CDMA networks in conjunction with multiuser detection. We map a...

  11. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition...

  12. Proactive Planning

    E-Print Network [OSTI]

    Wythe, Kathy

    2008-01-01T23:59:59.000Z

    , rainwater harvesting, stream bank stabilization, and educational programs to prevent urban and agricultural nonpoint source pollution. Project leaders plan to have the Cedar Creek Watershed Protection Plan finalized by the summer of 2008. ?We... on watershed management, stream restoration practices, agricultural best man- agement practices, rainwater harvesting, non- point source pollution control, on-site septic system maintenance, and other water quality issues facing urban and rural...

  13. 2006 National Electric Transmission Congestion Study Federal...

    Broader source: Energy.gov (indexed) [DOE]

    6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

  14. National Electric Transmission Congestion Study | Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Study National Electric Transmission Congestion Study National Electric Transmission Congestion Study Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C....

  15. 2009 National Electric Transmission Congestion Study | Department...

    Broader source: Energy.gov (indexed) [DOE]

    9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

  16. 2006 National Electric Transmission Congestion Study | Department...

    Broader source: Energy.gov (indexed) [DOE]

    6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

  17. National Electric Transmission Congestion Study Workshops | Department...

    Broader source: Energy.gov (indexed) [DOE]

    National Electric Transmission Congestion Study Workshops National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops to receive input...

  18. Natural Gas Transmission and Distribution Module

    Gasoline and Diesel Fuel Update (EIA)

    U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

  19. Natural Gas Transmission and Distribution Module

    Gasoline and Diesel Fuel Update (EIA)

    U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2013 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

  20. Natural Gas Transmission and Distribution Module This

    Gasoline and Diesel Fuel Update (EIA)

    U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2012 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

  1. DEPARTMENT OF ENERGY National Electric Transmission Congestion...

    Broader source: Energy.gov (indexed) [DOE]

    National Electric Transmission Congestion Report Docket No. 2007-OE-01, Mid-Atlantic Area National Interest Electric Transmission Corridor; Docket No. 2007-0E-02, Southwest Area...

  2. Directly correlated transmission electron microscopy and atom...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Directly correlated transmission electron microscopy and atom probe tomography of grain boundary oxidation in a Ni-Al binary Directly correlated transmission electron microscopy...

  3. CORPORATE AND STRATEGIC PLANNING Faculty planning workbook

    E-Print Network [OSTI]

    .............................................................................33 Staffing & workforce planningCORPORATE AND STRATEGIC PLANNING Faculty planning workbook Humanities, Law & Social Studies Outcomes from 2008/09 Confirmation of progress during 2009/10 Faculty planning for 2010/11 ­ 2012/13 #12

  4. B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Journal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    go to www.transmission.bpa.govPlanProj TransmissionProjects. Leaning Juniper II-Jones Canyon Substation Expansion Wind Interconnection Project Gilliam County, Ore. For...

  5. WECC Variable Generation Planning Reference Book: Appendices

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Du, Pengwei; Etingov, Pavel V.; Ma, Jian; Vyakaranam, Bharat

    2013-05-13T23:59:59.000Z

    The document titled “WECC Variable Generation Planning Reference Book”. This book is divided into two volumes; one is the main document (volume 1)and the other is appendices (volume 2). The main document is a collection of the best practices and the information regarding the application and impact of variables generation on power system planning. This volume (appendices) has additional information on the following topics: Probabilistic load flow problems. 2. Additional useful indices. 3. high-impact low-frequency (HILF) events. 4. Examples of wide-area nomograms. 5. Transmission line ratings, types of dynamic rating methods. 6. Relative costs per MW-km of different electric power transmission technologies. 7. Ultra-high voltage (UHV) transmission. 8.High voltage direct current (VSC-HVDC). 9. HVDC. 10. Rewiring of existing transmission lines. 11. High-temperature low sag (HTLS) conductors. 12. The direct method and energy functions for transient stability analysis in power systems. 13.Blackouts caused by voltage instability. 14. Algorithm for parameter continuation predictor-corrector methods. 15. Approximation techniques available for security regions. 16. Impacts of wind power on power system small signals stability. 17. FIDVR. 18. FACTS. 19. European planning standard and practices. 20. International experience in wind and solar energy sources. 21. Western Renewable Energy Zones (WREZ). 22. various energy storage technologies. 23. demand response. 24. BA consolidation and cooperation options. 25. generator power management requirements and 26. European planning guidelines.

  6. METRIC PROPERTIES AND EXCEPTIONAL SETS OF THE OPPENHEIM EXPANSIONS

    E-Print Network [OSTI]

    Fan, Ai-Hua

    METRIC PROPERTIES AND EXCEPTIONAL SETS OF THE OPPENHEIM EXPANSIONS OVER THE FIELD OF LAURENT SERIES in a large class of Oppenheim expansions of Laurent series, including Luroth, Engel, Sylvester expansions properties fail to hold. Key Words and Phrases Oppenheim expansions, Laurent series, #12;nite #12;eld

  7. A Traffic Density Analysis of Proposed Ferry Service Expansion in San Francisco Bay Using a Maritime Simulation Model

    E-Print Network [OSTI]

    van Dorp, Johan René

    a Maritime Simulation Model Jason R. W. Merrick* Department of Statistical Sciences and Operations Research and their increases caused by three alternative expansion plans. The output of the simulation model is a geographic of congestion on the waterway and the effect this will have on the safety of vessels in the area. A simulation

  8. NOVEMBER 2007 CEC-700-2007-018-CMF

    E-Print Network [OSTI]

    Executive Director B. B. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan Transmission Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CMF. #12; ii Addressing Public Opposition as a Barrier to Transmission Expansion...................... 8 Resolving Cost

  9. July 2, 2007 1 Optimal Transmission Switching

    E-Print Network [OSTI]

    Mangasarian, Olvi L.

    d to node n. zk: binary variable indicating whether transmission line k is removed from the system limit on number of open transmission lines Manuscript received July 2, 2007. This work was supported-mail: ferris@cs.wisc.edu). Sets : Set of all transmission lines L: Set of open transmission lines in solution

  10. Low-energy asymptotic expansion of the Green function for one-dimensional Fokker-Planck and Schrödinger equations

    E-Print Network [OSTI]

    Toru Miyazawa

    2011-12-26T23:59:59.000Z

    We consider Schr\\"odinger equations and Fokker-Planck equations in one dimension, and study the low-energy asymptotic behavior of the Green function using a new method. In this method, the coefficient of the expansion in powers of the wave number can be systematically calculated to arbitrary order, and the behavior of the remainder term can be analyzed on the basis of an expression in terms of transmission and reflection coefficients.

  11. Loop expansion in Yang-Mills thermodynamics

    E-Print Network [OSTI]

    Ralf Hofmann

    2009-11-05T23:59:59.000Z

    We argue that a selfconsistent spatial coarse-graining, which involves interacting (anti)calorons of unit topological charge modulus, implies that real-time loop expansions of thermodynamical quantities in the deconfining phase of SU(2) and SU(3) Yang-Mills thermodynamics are, modulo 1PI resummations, determined by a finite number of connected bubble diagrams.

  12. Climate Science: Tropical Expansion by Ocean Swing

    SciTech Connect (OSTI)

    Lu, Jian

    2014-04-01T23:59:59.000Z

    The tropical belt has become wider over the past decades, but climate models fall short of capturing the full rate of the expansion. The latest analysis of the climate simulations suggests that a long-term swing of the Pacific Decadal Oscillation is the main missing cause.

  13. Polymer Expansions for Cycle LDPC Codes

    E-Print Network [OSTI]

    Nicolas Macris; Marc Vuffray

    2012-02-13T23:59:59.000Z

    We prove that the Bethe expression for the conditional input-output entropy of cycle LDPC codes on binary symmetric channels above the MAP threshold is exact in the large block length limit. The analysis relies on methods from statistical physics. The finite size corrections to the Bethe expression are expressed through a polymer expansion which is controlled thanks to expander and counting arguments.

  14. Medical Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fund LasDubey MathematicaMeasuringMedical Plans Medical Plans

  15. Strategic Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBiSiteNeutronStrategic Plan The strategic planning process1/7/2010

  16. Transmission Lines Emulating Moving Media

    E-Print Network [OSTI]

    Vehmas, Joni; Tretyakov, Sergei

    2014-01-01T23:59:59.000Z

    In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

  17. PHYSICAL SCIENCES EXPANSION SERVICE UNIT PARK

    E-Print Network [OSTI]

    California at Davis, University of

    OF RESOURCE MANAGEMENT AND PLANNING University of California One Shields Avenue 376 Mrak Hall Davis, California 95616 February 2005 Contact: A. Sidney England, Director of Environmental Planning 530 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED 39 6 DETERMINATION 40 7 EVALUATION OF ENVIRONMENTAL IMPACTS 41 7

  18. The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions

    E-Print Network [OSTI]

    transmission right, electricity auction, simultaneous feasibility, transmission pricing. I. INTRODUCTION POINT

  19. The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions

    E-Print Network [OSTI]

    , transmission pricing. I. INTRODUCTION POINT-TO-POINT financial transmission rights (FTRs) (see [2] and [7

  20. Power superconducting power transmission cable

    DOE Patents [OSTI]

    Ashworth, Stephen P. (Cambridge, GB)

    2003-01-01T23:59:59.000Z

    The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

  1. Power Transmission, Distribution and Plants

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power Transmission, Distribution and Plants A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Abdel-Aal, Radwan E. - Computer Engineering Department, King Fahd University of...

  2. Plan Your School Visit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Your School Visit For Teachers Teachers Visit the Museum We Visit You Teacher Resources Home Schoolers Plan Your School Visit invisible utility element Plan Your School Visit...

  3. Milestone Plan Process Improvement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Milestone Plan Process Improvement Milestone Plan Process Improvement Background In response to our community's concern over the milestone plan (MP) process within the system, the...

  4. Energy planning and management plan

    SciTech Connect (OSTI)

    NONE

    1996-01-01T23:59:59.000Z

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

  5. Frostless heat pump having thermal expansion valves

    DOE Patents [OSTI]

    Chen, Fang C. (Knoxville, TN); Mei, Viung C. (Oak Ridge, TN)

    2002-10-22T23:59:59.000Z

    A heat pump system having an operable relationship for transferring heat between an exterior atmosphere and an interior atmosphere via a fluid refrigerant and further having a compressor, an interior heat exchanger, an exterior heat exchanger, a heat pump reversing valve, an accumulator, a thermal expansion valve having a remote sensing bulb disposed in heat transferable contact with the refrigerant piping section between said accumulator and said reversing valve, an outdoor temperature sensor, and a first means for heating said remote sensing bulb in response to said outdoor temperature sensor thereby opening said thermal expansion valve to raise suction pressure in order to mitigate defrosting of said exterior heat exchanger wherein said heat pump continues to operate in a heating mode.

  6. Locally-smeared operator product expansions

    SciTech Connect (OSTI)

    Monahan, Christopher; Orginos, Kostantinos

    2014-12-01T23:59:59.000Z

    We propose a "locally-smeared Operator Product Expansion" (sOPE) to decompose non-local operators in terms of a basis of locally-smeared operators. The sOPE formally connects nonperturbative matrix elements of smeared degrees of freedom, determined numerically using the gradient flow, to non-local operators in the continuum. The nonperturbative matrix elements do not suffer from power-divergent mixing on the lattice, provided the smearing scale is kept fixed in the continuum limit. The presence of this smearing scale prevents a simple connection to the standard operator product expansion and therefore requires the construction of a two-scale formalism. We demonstrate the feasibility of our approach using the example of real scalar field theory.

  7. Tests for the Expansion of the Universe

    E-Print Network [OSTI]

    Lopez-Corredoira, Martin

    2015-01-01T23:59:59.000Z

    Almost all cosmologists accept nowadays that the redshift of the galaxies is due to the expansion of the Universe (cosmological redshift), plus some Doppler effect of peculiar motions, but can we be sure of this fact by means of some other independent cosmological test? Here I will review some recent tests: CMBR temperature versus redshift, time dilation, the Hubble diagram, the Tolman or surface brightness test, the angular size test, the UV surface brightness limit and the Alcock--Paczy\\'nski test. Some tests favour expansion and others favour a static Universe. Almost all the cosmological tests are susceptible to the evolution of galaxies and/or other effects. Tolman or angular size tests need to assume very strong evolution of galaxy sizes to fit the data with the standard cosmology, whereas the Alcock--Paczynski test, an evaluation of the ratio of observed angular size to radial/redshift size, is independent of it.

  8. Low thermal expansion seal ring support

    DOE Patents [OSTI]

    Dewis, David W. (San Diego, CA); Glezer, Boris (Del Mar, CA)

    2000-01-01T23:59:59.000Z

    Today, the trend is to increase the temperature of operation of gas turbine engines. To cool the components with compressor discharge air, robs air which could otherwise be used for combustion and creates a less efficient gas turbine engine. The present low thermal expansion sealing ring support system reduces the quantity of cooling air required while maintaining life and longevity of the components. Additionally, the low thermal expansion sealing ring reduces the clearance "C","C'" demanded between the interface between the sealing surface and the tip of the plurality of turbine blades. The sealing ring is supported by a plurality of support members in a manner in which the sealing ring and the plurality of support members independently expand and contract relative to each other and to other gas turbine engine components.

  9. Shock compression and expansion in central collisions

    SciTech Connect (OSTI)

    Danielewicz, P. [Univ. of Washington, Seattle, WA (United States). Institute for Nuclear Theory]|[Michigan State Univ., East Lansing, MI (United States)

    1995-01-01T23:59:59.000Z

    Physics of central symmetric reactions of heavy nuclei, in the beam energy range from few tens of MeV to a couple of GeV per nucleon, is discussed. Within transport simulations, it is shown that shock fronts perpendicular to the beam axis form in the head-on reactions. The fronts propagate into projectile and target and they separate hot compressed matter from normal matter. With an increase of the impact parameter, the angle of inclination of fronts relative to the beam axis decreases, and in-between the fronts a weak tangential discontinuity develops. Hot matter exposed to the vacuum in directions perpendicular to the shock motion (and parallel to fronts), starts to expand sideways, early within reactions. Expansion in the direction of shock motion follows, after the shocks traverse nuclei, but due to the delay does not acquire same strength. Expansion affects angular distributions and mean-energy components, and further shapes of spectra and mean energies of different particles emitted into any one direction, and also particle yields. Both the anisotropy in the expansion and a collective motion associated with the weak discontinuity, affect the magnitude of sideward flow within reaction plane. Differences in mean particle energy components in and out of the reaction plane in semicentral collisions, depend sensitively on the relative magnitude of shock speed in normal matter and speed of sound in hot matter. The missing energy, considered in the past in association with low measured pion-multiplicity in central reactions, may be identified with the energy of collective expansion.

  10. Expansion and Collapse in the Cosmic Web

    E-Print Network [OSTI]

    Michael Rauch; George D. Becker; Matteo Viel; Wallace L. W. Sargent; Alain Smette; Robert A. Simcoe; Thomas A. Barlow; Martin G. Haehnelt

    2005-09-09T23:59:59.000Z

    We study the kinematics of the gaseous cosmic web at high redshift with Lyman alpha forest absorption in multiple QSO sightlines. Using a simple analytic model and a cosmological hydrodynamic simulation we constrain the underlying three-dimensional distribution of velocities from the observed line-of-sight distribution of velocity shear across the plane of the sky. The distribution is found to be in good agreement with the intergalactic medium (IGM) undergoing large scale motions dominated by the Hubble flow. Modeling the Lyman alpha clouds analytically and with a hydrodynamics simulation, the average expansion velocity of the gaseous structures causing the Lyman alpha forest in the lower redshift (z = 2) sample appears about 20 percent lower than the local Hubble expansion velocity. We interpret this as tentative evidence for some clouds undergoing gravitational collapse. However, the distribution of velocities is highly skewed, and the majority of clouds at redshifts from 2 to 3.8 expand typically about 5 - 20 percent faster than the Hubble flow. This behavior is explained if most absorbers in the column density range typically detectable are expanding filaments that stretch and drain into more massive nodes. We find no evidence for the observed distribution of velocity shear being significantly influenced by processes other than Hubble expansion and gravitational instability, like galactic winds. To avoid overly disturbing the IGM, winds may be old and/or limp by the time we observe them in the Lyman alpha forest, or they may occupy only an insignificant volume fraction of the IGM. (abridged)

  11. RAPID/BulkTransmission/Transmission Siting & Interconnection | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: EnergyPotentialUrbanUtilityScalePVCapacityPulaskiRAPID/BulkTransmission/Texas < RAPID‎ |

  12. Lafayette Metropolitan Planning Organization 2030 Transportation Plan

    E-Print Network [OSTI]

    Lafayette Metropolitan Planning Organization

    2010-10-31T23:59:59.000Z

    And Development Lafayette Metropolitan Planning Organization 2030 Transportation Plan DRAFT FINAL REPORT Prepared by Neel-Schaffer, Inc... ? 2020 DEFICIENCIES ........................................................................................... 51 FIGURE 11 ? 2030 DEFICIENCIES ........................................................................................... 52 FIGURE 12...

  13. Earth pressures and deformations in civil infrastructure in expansive soils

    E-Print Network [OSTI]

    Hong, Gyeong Taek

    2008-10-10T23:59:59.000Z

    This dissertation includes the three major parts of the study: volume change, and lateral earth pressure due to suction change in expansive clay soils, and design of civil infrastructure drilled pier, retaining wall and pavement in expansive soils...

  14. Statement from Energy Secretary Samuel W. Bodman on the Expansion...

    Broader source: Energy.gov (indexed) [DOE]

    the Expansion of the Strategic Petroleum Reserve to 1.5 Billion Statement from Energy Secretary Samuel W. Bodman on the Expansion of the Strategic Petroleum Reserve to 1.5 Billion...

  15. An Expansion in the Exponent for Compound Binomial Approximations

    E-Print Network [OSTI]

    Roos, Bero

    distributions. One paper in this direction was published by Bikelis [5], who proposed an expansion, which identic

  16. Maps and Plans

    E-Print Network [OSTI]

    Rose, Thomas

    2008-01-01T23:59:59.000Z

    shrouded door to box seats. Rose / Maps and Plans Re-Placing Places 20.1 Rose / Maps and Plans Re-Placing PlacesMaps and Plans Thomas Rose Architectural plans create the

  17. Transmission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler Tina ButlerTodayTransForumEnergyTransit

  18. Dynamical effects in the Coulomb expansion following nuclear fragmentation

    SciTech Connect (OSTI)

    Chung, K.C.; Donangelo, R.; Schechter, H.

    1987-09-01T23:59:59.000Z

    The effects of the Coulomb expansion on the fragment kinetic energy spectrum for a fragmentating hot nuclear system is investigated. In particular, /sup 12/C-fragment spectra are calculated and compared with those predicted by the uniform expansion approximation. The results indicate that the energy spectra of fragments are quite sensitive to the details of the Coulomb expansion treatment.

  19. A test of Taylor- and modified Taylor-expansion

    E-Print Network [OSTI]

    Max Wilfling; Christof Gattringer

    2014-04-08T23:59:59.000Z

    We compare Taylor expansion and a modified variant of Taylor expansion, which incorporates features of the fugacity series, for expansions in the chemical potential around a zero-density lattice field theory. As a first test we apply both series to the cases of free fermions and free bosons. Convergence and other properties are analyzed.

  20. Grid cell firing patterns signal environmental novelty by expansion

    E-Print Network [OSTI]

    Burgess, Neil

    Grid cell firing patterns signal environmental novelty by expansion Caswell Barrya,b,c,1 , Lin Lin novelty causes the spatial firing patterns of grid cells to expand in scale and reduce in regularity firing fields remapped and showed a smaller, temporary expansion. Grid expansion provides a potential

  1. Exploring Small-Scale Meat Processing Expansions in Iowa

    E-Print Network [OSTI]

    Debinski, Diane M.

    Exploring Small-Scale Meat Processing Expansions in Iowa A Technical Report Submitted@iastate.edu #12;2Exploring Small-Scale Meat Processing Expansions in Iowa April 2011 Overview of Findings Iowa;3Exploring Small-Scale Meat Processing Expansions in Iowa April 2011 Introduction Iowa is a national leader

  2. Matching of asymptotic expansions for the wave propagation in media

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Matching of asymptotic expansions for the wave propagation in media with thin slot S-SAM Matching of asymptotic expansions for the wave propagation in media with thin slot ­ p.1/38 inria-00528070 of asymptotic expansions for the wave propagation in media with thin slot ­ p.2/38 inria-00528070,version1-21Oct

  3. Matching of asymptotic expansions for the wave propagation in media

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Matching of asymptotic expansions for the wave propagation in media with thin slot S-SAM Matching of asymptotic expansions for the wave propagation in media with thin slot ­ p.1/29 inria-00528072 The wavelength The width of the slot ¡ Matching of asymptotic expansions for the wave propagation in media

  4. Annual Training Plan Template

    Broader source: Energy.gov [DOE]

    The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

  5. Midwest Transmission Workshop II Summary

    SciTech Connect (OSTI)

    Kevin Bryan

    2002-12-05T23:59:59.000Z

    OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

  6. Florida Electric Transmission Line Siting Act (Florida)

    Broader source: Energy.gov [DOE]

    The Transmission Line Siting Act (TLSA) is the state’s centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15...

  7. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

  8. Coiled transmission line pulse generators

    DOE Patents [OSTI]

    McDonald, Kenneth Fox (Columbia, MO)

    2010-11-09T23:59:59.000Z

    Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

  9. Representation of the Solar Capacity Value in the ReEDS Capacity Expansion Model: Preprint

    SciTech Connect (OSTI)

    Sigrin, B.; Sullivan, P.; Ibanez, E.; Margolis, R.

    2014-08-01T23:59:59.000Z

    An important emerging issue is the estimation of renewables' contributions to reliably meeting system demand, or their capacity value. While the capacity value of thermal generation can be estimated easily, assessment of wind and solar requires a more nuanced approach due to resource variability. Reliability-based methods, particularly, effective load-carrying capacity (ELCC), are considered to be the most robust techniques for addressing this resource variability. The Regional Energy Deployment System (ReEDS) capacity expansion model and other long-term electricity capacity planning models require an approach to estimating CV for generalized PV and system configurations with low computational and data requirements. In this paper we validate treatment of solar photovoltaic (PV) capacity value by ReEDS capacity expansion model by comparing model results to literature for a range of energy penetration levels. Results from the ReEDS model are found to compare well with both comparisons--despite not being resolved at an hourly scale.

  10. Major PM expansion at Universal-Cyclops features new consolidation process

    SciTech Connect (OSTI)

    Not Available

    1981-12-01T23:59:59.000Z

    A major expansion of powder-metallurgy facilities at Bridgeville, PA., has been recently announced by Universal-Cyclops Speciality Steel Div., Cyclops Corp. Production capacity for high-temperature alloys initially will be increased to two million pounds. Included in the planned project will be expansion of vacuum-induction melting (VIM), gas atomization, screening, blending, degassing, and handling capabilities. Air-atmosphere sintering furnaces will be installed to consolidate powder preforms by Universal-Cyclops' patented CAP (Consolidation by Atmospheric Pressure) process. Production from the new facility will serve the aircraft gas-turbine market. After chemical activation, the powder is placed in glass molds which are then evacuated and sealed. The filled molds are placed in a refractory container, surrounded by sand, and the entire assembly is heated in conventional air atmosphere electric or gas-fired furnace to temperatures over 2000/degree/F.

  11. Articles about Grid Integration and Transmission

    Broader source: Energy.gov [DOE]

    Stories about grid integration and transmission featured by the U.S. Department of Energy (DOE) Wind Program.

  12. Plans, Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar Home Design Passive SolarCenterYou are here: SN Home page|Plans,

  13. Program Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada wins GeraldDuncan McBranchProgram Planning at

  14. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAbout » Staff125,849| OSTI, US Dept ofStrategic Plan Print

  15. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAbout » Staff125,849| OSTI, US Dept ofStrategic Plan

  16. Transmission Dr. Sandra Cruz-Pol

    E-Print Network [OSTI]

    Cruz-Pol, Sandra L.

    Transmission Lines Dr. Sandra Cruz-Pol ECE Dept. UPRM Exercise 11.3 n A 40-m long TL has Vg=15 Vrms to electric circuits! cmc kmc GHz Hz 15000,000,2000/ 000,560/ 2 60 == == Transmission Lines I. TL parameters-wave transformer ¨ Slotted line ¨ Single stub VI. Microstrips Transmission Lines (TL) n TL have two conductors

  17. Venus Technology Plan Venus Technology Plan

    E-Print Network [OSTI]

    Rathbun, Julie A.

    Venus Technology Plan May 2014 #12; ii Venus Technology Plan At the Venus Exploration Survey priorities, and (3) develop a Technology Plan for future Venus missions (after a Technology Forum at VEXAG Meeting 11 in November 2013). Here, we present the 2014 Venus Technology Plan

  18. Lattice-structures and constructs with designed thermal expansion coefficients

    SciTech Connect (OSTI)

    Spadaccini, Christopher; Hopkins, Jonathan

    2014-10-28T23:59:59.000Z

    A thermal expansion-managed lattice structure having a plurality of unit cells each having flexure bearing-mounted tabs supported on a base and actuated by thermal expansion of an actuator having a thermal expansion coefficient greater than the base and arranged so that the tab is inwardly displaced into a base cavity. The flexure bearing-mounted tabs are connected to other flexure-bearing-mounted tabs of adjacent unit cells so that the adjacent unit cells are spaced from each other to accommodate thermal expansion of individual unit cells while maintaining a desired bulk thermal expansion coefficient of the lattice structure as a whole.

  19. Real-Options-Based Planning Strategies under Uncertainty Anshuman Gupta and Costas D. Maranas*

    E-Print Network [OSTI]

    Maranas, Costas

    opportunities to guide internal planning decisions of a company. This is achieved by applying key financial-range, capacity expansion planning;1,6-8 multi-echelon supply-chain design;9 batch plant design and operation;7, integration of a shaper attitude toward risk, as captured by the us

  20. Accelerating cycle expansions by dynamical conjugacy

    E-Print Network [OSTI]

    Ang Gao; Jianbo Xie; Yueheng Lan

    2011-06-06T23:59:59.000Z

    Periodic orbit theory provides two important functions---the dynamical zeta function and the spectral determinant for the calculation of dynamical averages in a nonlinear system. Their cycle expansions converge rapidly when the system is uniformly hyperbolic but greatly slowed down in the presence of non-hyperbolicity. We find that the slow convergence can be associated with singularities in the natural measure. A properly designed coordinate transformation may remove these singularities and results in a dynamically conjugate system where fast convergence is restored. The technique is successfully demonstrated on several examples of one-dimensional maps and some remaining challenges are discussed.

  1. Stability of Anisotropic Cylinder with Zero Expansion

    E-Print Network [OSTI]

    M. Sharif; M. Azam

    2013-05-24T23:59:59.000Z

    We study the dynamical instability of anisotropic collapsing cylinder with the expansion-free condition, which generates vacuum cavity within fluid distribution. The perturbation scheme is applied to distinguish Newtonian, post-Newtonian and post-post Newtonian terms, which are used for constructing dynamical equation at Newtonian and post-Newtonian regimes. We analyze the role of pressure anisotropy and energy density inhomogeneity on the stability of collapsing cylinder. It turns out that stability of the cylinder depends upon these physical properties of the fluid, not on the stiffness of the fluid.

  2. Calculations of Surface Thermal-Expansion

    E-Print Network [OSTI]

    KENNER, VE; Allen, Roland E.

    1973-01-01T23:59:59.000Z

    , the quasiharmon- ic approximation (plus the Lennard-Jones potential) predicts values of e???which are too large. " The monic approximation (plus the Lennard- Jones poten- 0 20 40 TEMPERATURE T 60 FIG. 9. Surface thermal expansion for Xe. tial) thus tend... to cancel, so that our results are more accurate than those obtained in more rigorous calcu- lations based on the quasihar monic approximation. The bulk results shown in Figs. 1-6 were ob- tained for a slab having a (111)surface orientation...

  3. Comments of New England Electric Transmission Corporation on...

    Broader source: Energy.gov (indexed) [DOE]

    out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and...

  4. Oahu Wind Integration and Transmission Study (OWITS): Hawaiian...

    Energy Savers [EERE]

    Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands...

  5. Fact #850: December 8, 2014 Automatic Transmissions have closed...

    Broader source: Energy.gov (indexed) [DOE]

    Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed...

  6. Treatment of Solar Generation in Electric Utility Resource Planning (Presentation)

    SciTech Connect (OSTI)

    Cory, K.; Sterling, J.; Taylor, M.; McLaren, J.

    2014-01-01T23:59:59.000Z

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. Through interviews and a questionnaire, the authors gathered information on utility supply planning and how solar is represented. Utilities were asked to provide their resource planning process details, key assumptions (e.g. whether DG is represented as supply or negative load), modeling methodology (e.g. type of risk analytics and candidate portfolio development), capacity expansion and production simulation model software, and solar project representation (project size, capacity value and integration cost adder). This presentation aims to begin the exchange of information between utilities, regulators and other stakeholders by capturing utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  7. Lift-and-Project Relaxations of AC Microgrid Distribution System Planning

    E-Print Network [OSTI]

    Taylor, Joshua A.

    2011-01-01T23:59:59.000Z

    We apply relaxation procedures to polynomial optimization problems that originate in transmission system planning, and obtain new convex formulations for the AC case. The approach is novel because the optimization is ...

  8. Recent Developments in the Regulation of Electric Utility Resource Planning in Texas

    E-Print Network [OSTI]

    Totten, J.; Adib, P.; Matlock, R.; Treadway, N.

    The Texas Legislature has charged the Public Utility Commission of Texas with the responsibility to license utility power plants and transmission lines, and develop a statewide electrical energy plan. Related duties include the encouragement...

  9. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    SciTech Connect (OSTI)

    Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

    2013-01-01T23:59:59.000Z

    This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

  10. Automated manual transmission shift sequence controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (Whitmore Lake, MI); Reed, Richard G. (Royal Oak, MI); Rausen, David J. (Denver, CO)

    2000-02-01T23:59:59.000Z

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  11. Automated manual transmission mode selection controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (Whitmore Lake, MI)

    1999-11-09T23:59:59.000Z

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  12. Is Hubble's Expansion due to Dark Energy

    E-Print Network [OSTI]

    R. C. Gupta; Anirudh Pradhan

    2010-10-19T23:59:59.000Z

    {\\it The universe is expanding} is known (through Galaxy observations) since 1929 through Hubble's discovery ($V = H D$). Recently in 1999, it is found (through Supernovae observations) that the universe is not simply expanding but is accelerating too. We, however, hardly know only $4\\%$ of the universe. The Wilkinson Microwave Anisotropy Probe (WMAP) satellite observational data suggest $73\\%$ content of the universe in the form of dark-energy, $23\\%$ in the form of non-baryonic dark-matter and the rest $4\\%$ in the form of the usual baryonic matter. The acceleration of the universe is ascribed to this dark-energy with bizarre properties (repulsive-gravity). The question is that whether Hubble's expansion is just due to the shock of big-bang & inflation or it is due to the repulsive-gravity of dark-energy? Now, it is believed to be due to dark-energy, say, by re-introducing the once-discarded cosmological-constant $\\Lambda$. In the present paper, it is shown that `the formula for acceleration due to dark-energy' is (almost) exactly of same-form as `the acceleration formula from the Hubble's law'. Hence, it is concluded that: yes, `indeed it is the dark-energy responsible for the Hubble's expansion too, in-addition to the current on-going acceleration of the universe'.

  13. 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161

    E-Print Network [OSTI]

    ­ Western Interconnection (WECC) 5 WECC 10 and 20 Year Plans § In 2007, WECC's Transmission Expansion, WECC expanded this effort under the Regional Transmission Expansion Project (RTEP) project and agreed to develop "Transmission Plans" in 2011 and 2013 #12;7/26/2012 4 WECC 10 and 20 Year Plans The first 10 year

  14. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, Russell B. (Oakland, CA)

    1987-01-01T23:59:59.000Z

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  15. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, R.B.

    1985-08-15T23:59:59.000Z

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  16. Relativistic tunneling and accelerated transmission

    E-Print Network [OSTI]

    Alex E. Bernardini

    2007-06-26T23:59:59.000Z

    We obtain the solutions for the tunneling zone of a one-dimensional electrostatic potential in the relativistic (Dirac to Klein-Gordon) wave equation regime when the incoming wave packet exhibits the possibility of being almost totally transmitted through the potential barrier. The conditions for the occurrence of accelerated and, eventually, superluminal tunneling transmission probabilities are all quantified and the problematic superluminal interpretation originated from the study based on non-relativistic dynamics of tunneling is overcome. The treatment of the problem suggests revealing insights into condensed-matter experiments using electrostatic barriers in single- and bi-layer graphene, for which the accelerated tunneling effect deserves a more careful investigation.

  17. Electric Transmission Line Siting Compact

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement Tuesday,DepartmentTheandElectric Transmission

  18. Hanford Site Development Plan

    SciTech Connect (OSTI)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01T23:59:59.000Z

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  19. History of wireless power transmission

    SciTech Connect (OSTI)

    Brown, W.C. [Microwave Power Transmission Systems, Weston, MA (United States)] [Microwave Power Transmission Systems, Weston, MA (United States)

    1996-12-31T23:59:59.000Z

    The history of wireless power transmission at microwave frequencies is reviewed with emphasis upon the time period starting with the post World War II efforts to use the new microwave technology developed during the war. A nationally televised demonstration of a microwave powered helicopter at the Spencer Laboratory of the Raytheon Co., in 1964 was the result of these early efforts and broadly introduced the concept of wireless power transmission to scientific and engineering communities and to the public. Subsequent development efforts centered on improving the efficiency of the interconversion of d.c. and microwave power at the ends of the system to reach a demonstrated overall d.c. to d.c. system efficiency of 54% in 1974. The response to the requirements of applications such as the Solar Power Satellite and high altitude microwave powered aircraft have changed the direction of technology development and greatly expanded the technology base. Recent and current efforts are centered on examining the use of higher frequencies than the baseline 2.45 GHz, and in reducing the system costs at 2.45 GHz. 26 refs., 14 figs.

  20. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 60- to 67-mile long 230-kV transmission line. BPA’s proposed action is to interconnect the transmission line to an existing BPA substation. Additional information is available at http://www.blm.gov/or/districts/spokane/plans/vph230/.

  1. 2030 OCARTS Plan Report

    E-Print Network [OSTI]

    Association of Central Oklahoma Governments

    ......................................Director of Planning & Program Development Pearlie Tiggs................................................................... Community Planner 2030 OCARTS Plan Report Table of Contents PART 1 INTRODUCTION........................................................................ 1 Federal Legislation.......................................................................... 1 Purpose of the Plan Report and Relationship to other Plan Documents............. 3 Organization of the Transportation Planning Process...

  2. Wind Integration, Transmission, and Resource Assessment andCharacteri...

    Broader source: Energy.gov (indexed) [DOE]

    Integration, Transmission, and Resource Assessment and Characterization Projects Wind Integration, Transmission, and Resource Assessment and Characterization Projects From 2006 to...

  3. Thermal expansion recovery microscopy: Practical design considerations

    SciTech Connect (OSTI)

    Mingolo, N., E-mail: nmingol@fi.uba.ar; Martínez, O. E. [Facultad de Ingeniería, Universidad de Buenos Aires, Paseo Colon 850, 1063 Buenos Aires (Argentina)] [Facultad de Ingeniería, Universidad de Buenos Aires, Paseo Colon 850, 1063 Buenos Aires (Argentina)

    2014-01-15T23:59:59.000Z

    A detailed study of relevant parameters for the design and operation of a photothermal microscope technique recently introduced is presented. The technique, named thermal expansion recovery microscopy (ThERM) relies in the measurement of the defocusing introduced by a surface that expands and recovers upon the heating from a modulated source. A new two lens design is presented that can be easily adapted to commercial infinite conjugate microscopes and the sensitivity to misalignment is analyzed. The way to determine the beam size by means of a focus scan and the use of that same scan to verify if a thermoreflectance signal is overlapping with the desired ThERM mechanism are discussed. Finally, a method to cancel the thermoreflectance signal by an adequate choice of a nanometric coating is presented.

  4. Critical point anomalies include expansion shock waves

    SciTech Connect (OSTI)

    Nannan, N. R., E-mail: ryan.nannan@uvs.edu [Mechanical Engineering Discipline, Anton de Kom University of Suriname, Leysweg 86, PO Box 9212, Paramaribo, Suriname and Process and Energy Department, Delft University of Technology, Leeghwaterstraat 44, 2628 CA Delft (Netherlands); Guardone, A., E-mail: alberto.guardone@polimi.it [Department of Aerospace Science and Technology, Politecnico di Milano, Via La Masa 34, 20156 Milano (Italy); Colonna, P., E-mail: p.colonna@tudelft.nl [Propulsion and Power, Delft University of Technology, Kluyverweg 1, 2629 HS Delft (Netherlands)

    2014-02-15T23:59:59.000Z

    From first-principle fluid dynamics, complemented by a rigorous state equation accounting for critical anomalies, we discovered that expansion shock waves may occur in the vicinity of the liquid-vapor critical point in the two-phase region. Due to universality of near-critical thermodynamics, the result is valid for any common pure fluid in which molecular interactions are only short-range, namely, for so-called 3-dimensional Ising-like systems, and under the assumption of thermodynamic equilibrium. In addition to rarefaction shock waves, diverse non-classical effects are admissible, including composite compressive shock-fan-shock waves, due to the change of sign of the fundamental derivative of gasdynamics.

  5. EMPIRE ULTIMATE EXPANSION: RESONANCES AND COVARIANCES.

    SciTech Connect (OSTI)

    HERMAN,M.; MUGHABGHAB, S.F.; OBLOZINSKY, P.; ROCHMAN, D.; PIGNI, M.T.; KAWANO, T.; CAPOTE, R.; ZERKIN, V.; TRKOV, A.; SIN, M.; CARSON, B.V.; WIENKE, H. CHO, Y.-S.

    2007-04-22T23:59:59.000Z

    The EMPIRE code system is being extended to cover the resolved and unresolved resonance region employing proven methodology used for the production of new evaluations in the recent Atlas of Neutron Resonances. Another directions of Empire expansion are uncertainties and correlations among them. These include covariances for cross sections as well as for model parameters. In this presentation we concentrate on the KALMAN method that has been applied in EMPIRE to the fast neutron range as well as to the resonance region. We also summarize role of the EMPIRE code in the ENDF/B-VII.0 development. Finally, large scale calculations and their impact on nuclear model parameters are discussed along with the exciting perspectives offered by the parallel supercomputing.

  6. Systematic expansion for infrared oscillator basis extrapolations

    E-Print Network [OSTI]

    R. J. Furnstahl; S. N. More; T. Papenbrock

    2014-03-20T23:59:59.000Z

    Recent work has demonstrated that the infrared effects of harmonic oscillator basis truncations are well approximated by imposing a partial-wave Dirichlet boundary condition at a properly identified radius L. This led to formulas for extrapolating the corresponding energy E_L and other observables to infinite L and thus infinite basis size. Here we reconsider the energy for a two-body system with a Dirichlet boundary condition at L to identify and test a consistent and systematic expansion for E_L that depends only on observables. We also generalize the energy extrapolation formula to nonzero angular momentum, and apply it to the deuteron. Formulas given previously for extrapolating the radius are derived in detail.

  7. Superconducting transmission line particle detector

    DOE Patents [OSTI]

    Gray, K.E.

    1988-07-28T23:59:59.000Z

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

  8. Superconducting transmission line particle detector

    DOE Patents [OSTI]

    Gray, Kenneth E. (Naperville, IL)

    1989-01-01T23:59:59.000Z

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

  9. Management Plan Supplement Yakima Subbasin Plan

    E-Print Network [OSTI]

    #12;Management Plan Supplement Yakima Subbasin Plan November 26, 2004 Prepared for the Presented's subbasin planning process is iterative and designed within an adaptive management framework. Management is comprised of elected officials from local governments throughout the subbasin, and meets regularly to work

  10. Load Expansion of Stoichiometric HCCI Using Spark Assist and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Stoichiometric HCCI Using Spark Assist and Hydraulic Valve Actuation Load Expansion of Stoichiometric HCCI Using Spark Assist and Hydraulic Valve Actuation Presentation given at...

  11. FOA aimed at growing expansive database of Renewable Energy and...

    Open Energy Info (EERE)

    FOA aimed at growing expansive database of Renewable Energy and Energy Efficiency Incentives and Policies Home > Groups > Utility Rate Graham7781's picture Submitted by...

  12. accelerated cosmic expansion: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    an accelerated expansion (cosmological constant, quintessence) introduce a component of dark energy besides standard'' cold dark matter (CDM) we resort to a phenomenological...

  13. Load Expansion with Diesel/Gasoline RCCI for Improved Engine...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    with DieselGasoline RCCI for Improved Engine Efficiency and Emissions Load Expansion with DieselGasoline RCCI for Improved Engine Efficiency and Emissions This poster will...

  14. The transmission system as main actor in electricity market development in Romania

    SciTech Connect (OSTI)

    Petrescu, A.M.; Mihailescu, F.

    1998-07-01T23:59:59.000Z

    At the beginning of 1998, Romanian Electricity Authority (RENEL) was a fully integrated generation, transmission and distribution company, which managed all aspects of planning, design, and operation of Romania' s electricity sector. This form of vertically integrated organization has enabled to develop the high voltage transmission system in order to transfer electricity from the large power plants on indigenous coal (lignite) to the deficit electricity areas. An analysis based on specific characteristics of Romanian Transmission System allows the identification of a suitable model cost for transmission services evaluation. The transmission electricity tariff as a market tool has become a necessity for the heterogeneous Romanian power systems from the repartition of the generation against the demand location point of view. The experience of the power system development planner shows that the most suitable model for the transmission electricity system cost assessment is the rated zones in order to reflect the geographical imbalance of generation and demand and the ability of the transmission system to accommodate this imbalance. Setting principles for the cost evaluation has to be sustained by the service evaluation on the grid nodes at the interface between transmission system and distribution system. This cost evaluation under the form of incentives for new producers has to be reconsidered year by year taking into account the evolution in time both production side and demand side. The incentives have to be addressed directly to the producers and must be strong enough to provide an efficient reliable operation of the whole power system. Transmission planners have to develop new approaches to deal with the uncertainties of the market; a combination of market forces and regulation seems to ensure the best way for the quality and security of the power system beside of the efficiency of all actors from the electricity market.

  15. Strategic Energy Planning Webinar

    Broader source: Energy.gov [DOE]

    Attendees will learn about developing a strategic energy plan, identifying key aspects of successful energy planning, and using available information and resources, including archived webinars in...

  16. Accidental Death & Dismemberment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Death & Dismemberment Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact...

  17. Strategic Health Workforce Planning

    E-Print Network [OSTI]

    2013-05-11T23:59:59.000Z

    May 11, 2013 ... Health workforce planning plays a key role in the United States and ... workforce plans should account for lags implied by training new ...

  18. Transmission Reassignment Reporting Requirement - April 2, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Transmission Reassignment Reporting Requirement This notice...

  19. Transmission and Generation Investment in Electricity Markets

    E-Print Network [OSTI]

    Grimm Veronika

    2015-03-04T23:59:59.000Z

    Mar 4, 2015 ... The model incorporates investment decisions of the transmission operator and private firms in expectation of an energy-only market and ...

  20. 2009 National Electric Transmission Congestion Study - Oklahoma...

    Broader source: Energy.gov (indexed) [DOE]

    - Oklahoma City Workshop 2009 National Electric Transmission Congestion Study - Oklahoma City Workshop On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City,...

  1. Natural Gas Transmission Pipeline Siting Act (Florida)

    Broader source: Energy.gov [DOE]

    This Act establishes a centralized and coordinated permitting process for the location of natural gas transmission pipeline corridors and the construction and maintenance of natural gas...

  2. Final Report Navajo Transmission Project (NTP)

    SciTech Connect (OSTI)

    Bennie Hoisington; Steven Begay

    2006-09-14T23:59:59.000Z

    The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

  3. SunZia Southwest Transmission Project Comments

    Energy Savers [EERE]

    Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

  4. 2012 National Electric Transmission Congestion Study: Preliminary...

    Broader source: Energy.gov (indexed) [DOE]

    Meyer Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 2012 National Electric Transmission Congestion Study Preliminary Findings Stakeholder...

  5. Energy Department, Arizona Utilities Announce Transmission Infrastruct...

    Office of Environmental Management (EM)

    project that will serve the state's growing electrical energy needs, attract renewable energy development to the area, and strengthen the transmission system in the Southwestern...

  6. Exploring the Business Link Opportunity: Transmission & Clean...

    Energy Savers [EERE]

    Jennifer Weddle, Greenberg Traurig LLP Rapid Response Team for Transmission: Laura Smith Morton, DOE Energy Storage: Michael Stosser, Day Pitney LLP Centennial West Clean...

  7. Transmission Line Security Monitor: Final Report

    SciTech Connect (OSTI)

    John Svoboda

    2011-04-01T23:59:59.000Z

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  8. Flexible Transmission in the Smart Grid

    E-Print Network [OSTI]

    Hedman, Kory Walter

    2010-01-01T23:59:59.000Z

    New England Outlook: Smart Grid is About Consumers,” Apr. [Transmission in the Smart Grid By Kory Walter Hedman ATransmission in the Smart Grid by Kory Walter Hedman Doctor

  9. Detonator comprising a nonlinear transmission line

    DOE Patents [OSTI]

    Elizondo-Decanini, Juan M

    2014-12-30T23:59:59.000Z

    Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

  10. TransWest Express Transmission Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the Anschutz Corporation. The Project consists of an overhead transmission line extending approximately 725 miles from south-central Wyoming crossing Colorado and...

  11. FY 2013 Major Capital Outlay Project Request and Five-Year Comprehensive Master Plan

    E-Print Network [OSTI]

    in the following specific areas: Transmission & Distribution (smart grids technology, cyber-security) GenerationFY 2013 Major Capital Outlay Project Request and Five-Year Comprehensive Master Plan September 2011 ____ No _X__ Is There a Five-Year Capital Outlay Plan Available? Yes _X__ No ____ Are Professionally

  12. The US market for high-temperature superconducting wire in transmission cable applications

    SciTech Connect (OSTI)

    Forbes, D.

    1996-04-01T23:59:59.000Z

    Telephone interviews were conducted with 23 utility engineers concerning the future prospects for high-temperature superconducting (HTS) transmission cables. All have direct responsibility for transmission in their utility, most of them in a management capacity. The engineers represented their utilities as members of the Electric Power Research Institute`s Underground Transmission Task Force (which has since been disbanded). In that capacity, they followed the superconducting transmission cable program and are aware of the cryogenic implications. Nineteen of the 23 engineers stated the market for underground transmission would grow during the next decade. Twelve of those specified an annual growth rate; the average of these responses was 5.6%. Adjusting that figure downward to incorporate the remaining responses, this study assumes an average growth rate of 3.4%. Factors driving the growth rate include the difficulty in securing rights-of-way for overhead lines, new construction techniques that reduce the costs of underground transmission, deregulation, and the possibility that public utility commissions will allow utilities to include overhead costs in their rate base. Utilities have few plans to replace existing cable as preventive maintenance, even though much of the existing cable has exceeded its 40-year lifetime. Ten of the respondents said the availability of a superconducting cable with the same life-cycle costs as a conventional cable and twice the ampacity would induce them to consider retrofits. The respondents said a cable with those characteristics would capture 73% of their cable retrofits.

  13. Horizon surface gravity as 2d geodesic expansion

    E-Print Network [OSTI]

    Ted Jacobson; Renaud Parentani

    2008-08-13T23:59:59.000Z

    The surface gravity of any Killing horizon, in any spacetime dimension, can be interpreted as a local, two-dimensional expansion rate seen by freely falling observers when they cross the horizon. Any two-dimensional congruence of geodesics invariant under the Killing flow can be used to define this expansion, provided that the observers have unit Killing energy.

  14. POSITIVITY CASES, ESTIMATES AND ASYMPTOTIC EXPANSIONS FOR CONDENSER CAPACITIES.

    E-Print Network [OSTI]

    Boyer, Edmond

    POSITIVITY CASES, ESTIMATES AND ASYMPTOTIC EXPANSIONS FOR CONDENSER CAPACITIES. ALAIN BONNAF´E Abstract. We study positivity cases, estimates and asymptotic expansions of condenser p the internal part of the condenser has a non-empty interior. The study of the point and its approximation

  15. The effective pyroelectric and thermal expansion coefficients of ferroelectric ceramics

    E-Print Network [OSTI]

    Li, Jiangyu

    The effective pyroelectric and thermal expansion coefficients of ferroelectric ceramics JiangYu Li an estimate on the effective pyroelectric and thermal expansion coefficients of fer- roelectric ceramics, and thermal-medical diagnostics (Cross, 1993). A ceramic made of pyroelectric grains does not necessarily

  16. ON PROVING FUTURE STABILITY OF COSMOLOGICAL SOLUTIONS WITH ACCELERATED EXPANSION

    E-Print Network [OSTI]

    Ringström, Hans

    ON PROVING FUTURE STABILITY OF COSMOLOGICAL SOLUTIONS WITH ACCELERATED EXPANSION HANS RINGSTR at an accelerated rate. As a consequence, it is of interest to prove that cosmological solutions to Ein- stein's equations with accelerated expansion are future stable. That is the topic of the present contribution

  17. Renewable Energy Transmission Initiative Phase 1A

    E-Print Network [OSTI]

    Renewable Energy Transmission Initiative Phase 1A DRAFT REPORT MARCH 2008 RETI-1000-2008-001-D #12;RETI Stakeholder Steering Committee Renewable Energy Transmission Initiative Phase 1A DRAFT REPORT B are registered trademarks of Black & Veatch Holding Company #12;RETI Stakeholder Steering Committee Renewable

  18. TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM

    E-Print Network [OSTI]

    McBrien, Peter

    RFC: 793 TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM PROTOCOL SPECIFICATION September 1981 Admiralty Way Marina del Rey, California 90291 #12;#12;September 1981 Transmission Control Protocol TABLE ........................................... 12 2.9 Precedence and Security ...................................... 13 2.10 Robustness Principle

  19. Executive Forum on Solutions to Transmission Investment

    E-Print Network [OSTI]

    . California ISO CenterPoint Energy Duke Energy Entergy EPRI Exelon FirstEnergy GE Energy Institut de recherche Transmission Co. MidAmerican Energy Midwest Independent Transmission System Operator (MISO) National Grid USA National Rural Electric Coop. Assn. New York ISO New York Power Authority Pacific Gas and Electric PJM

  20. Electric Transmission Line Flashover Prediction System

    E-Print Network [OSTI]

    Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

  1. Hopi Sustainable Energy Plan

    SciTech Connect (OSTI)

    Norman Honie, Jr.; Margie Schaff; Mark Hannifan

    2004-08-01T23:59:59.000Z

    The Hopi Tribal Government as part of an initiative to ?Regulate the delivery of energy and energy services to the Hopi Reservation and to create a strategic business plan for tribal provision of appropriate utility, both in a manner that improves the reliability and cost efficiency of such services,? established the Hopi Clean Air Partnership Project (HCAPP) to support the Tribe?s economic development goals, which is sensitive to the needs and ways of the Hopi people. The Department of Energy (DOE) funded, Formation of Hopi Sustainable Energy Program results are included in the Clean Air Partnership Report. One of the Hopi Tribe?s primary strategies to improving the reliability and cost efficiency of energy services on the Reservation and to creating alternative (to coal) economic development opportunities is to form and begin implementation of the Hopi Sustainable Energy Program. The Hopi Tribe through the implementation of this grant identified various economic opportunities available from renewable energy resources. However, in order to take advantage of those opportunities, capacity building of tribal staff is essential in order for the Tribe to develop and manage its renewable energy resources. As Arizona public utilities such as APS?s renewable energy portfolio increases the demand for renewable power will increase. The Hopi Tribe would be in a good position to provide a percentage of the power through wind energy. It is equally important that the Hopi Tribe begin a dialogue with APS and NTUA to purchase the 69Kv transmission on Hopi and begin looking into financing options to purchase the line.

  2. Motion Planning ! Jana Kosecka!

    E-Print Network [OSTI]

    Kosecka, Jana

    1! Motion Planning ! Jana Kosecka! Department of Computer Science! ·Discrete planning, graph search://cs.cmu.edu/~motionplanning, Jyh-Ming Lien! Discrete Planning! · Review of some discrete planning methods! · Given state space is discrete) ! · Use well developed search and graph traversal algorithms to find the path! · Path: set

  3. Climate change action plan

    E-Print Network [OSTI]

    Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

  4. Intermountain Province Subbasin Plan

    E-Print Network [OSTI]

    , and stakeholders. The IMP subbasin plan includes: · an assessment providing the technical foundation for the plan Power and Conservation Council Portland, Oregon O N B E H A L F O F : Intermountain Province Oversight Planning in the Intermountain Province The Northwest Power Planning Council1 's (Council) 2000 Fish

  5. Economic and technical impacts of wind variability and intermittency on long-term generation expansion planning

    E-Print Network [OSTI]

    Paristech 2009 Submitted to the Engineering Systems Division in partial fulfillment of the requirements to the Engineering Systems Division on May 6, 2011 in partial fulfillment of the requirements for the Degree of the U.S. I aggregate an hourly dataset of load and wind resource in eleven regions in order to capture

  6. VLA EXPANSION PROJECT MANAGEMENT PLAN Version 1.0 September 2001

    E-Print Network [OSTI]

    Groppi, Christopher

    of the key observational capabilities of the Very Large Array (VLA) by at least an order of magnitude....................................................... 4 Figure 1. NRAO Organization Chart

  7. Hybrid Generation Systems Planning Expansion Forecast: A Critical State of the Art Review

    E-Print Network [OSTI]

    Brest, Université de

    resources. In order to power system enhance reliability, efficiency and safety, renewable and nonrenewable, hydropower, geothermal, and biomass constitute a type of distributed electricity resources and have recently, these generation unit should be working together in two or more sources in the so-called hybrid system concept

  8. Stochastic Methods for Planning and Operating Power Systems with Large Amounts of Wind and Solar Power: Preprint

    SciTech Connect (OSTI)

    Milligan, M.; Donohoo, P.; O'Malley, M.

    2012-09-01T23:59:59.000Z

    Wind and solar generators differ in their generation characteristics than conventional generators. The variable output and imperfect predictability of these generators face a stochastic approach to plan and operate the power system without fundamentally changing the operation and planning problems. This paper overviews stochastic modeling challenges in operations, generation planning, and transmission planning, with references to current industry and academic work. Different stochastic problem formulations, including approximations, are also discussed.

  9. Toward a more deliberative port planning : the "vision and daring" of environmental NGOs in negotiations on the Second Maasvlakte, Port of Rotterdam, the Netherlands

    E-Print Network [OSTI]

    Kelly, Sarah D. (Sarah Driscoll)

    2005-01-01T23:59:59.000Z

    This thesis examines the planning process for a major expansion project in the Port of Rotterdam, the Netherlands (Maasvlakte 2), as a case study of mutual gains-oriented consensus building and interactive problem solving. ...

  10. Local gravitational physics of the Hubble expansion

    E-Print Network [OSTI]

    Sergei Kopeikin

    2015-01-21T23:59:59.000Z

    We study physical consequences of the Hubble expansion of FLRW manifold on measurement of space, time and light propagation in the local inertial frame. We analyse the solar system radar ranging and Doppler tracking experiments, and time synchronization. FLRW manifold is covered by global coordinates (t,y^i), where t is the cosmic time coinciding with the proper time of the Hubble observers. We introduce local inertial coordinates x^a=(x^0,x^i) in the vicinity of a world line of a Hubble observer with the help of a special conformal transformation. The local inertial metric is Minkowski flat and is materialized by the congruence of time-like geodesics of static observers being at rest with respect to the local spatial coordinates x^i. We consider geodesic motion of test particles and notice that the local coordinate time x^0=x^0(t) taken as a parameter along the world line of particle, is a function of the Hubble's observer time t. This function changes smoothly from x^0=t for a particle at rest (observer's clock), to x^0=t+1/2 Ht^2 for photons, where H is the Hubble constant. Thus, motion of a test particle is non-uniform when its world line is parametrized by time t. NASA JPL Orbit Determination Program presumes that motion of light (after the Shapiro delay is excluded) is uniform with respect to the time t but it does not comply with the non-uniform motion of light on cosmological manifold. For this reason, the motion of light in the solar system analysed with the Orbit Determination Program appears as having a systematic blue shift of frequency, of radio waves circulating in the Earth-spacecraft radio link. The magnitude of the anomalous blue shift of frequency is proportional to the Hubble constant H that may open an access to the measurement of this fundamental cosmological parameter in the solar system radiowave experiments.

  11. The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.

    E-Print Network [OSTI]

    Wiser, Ryan

    2014-01-01T23:59:59.000Z

    ZLWK:LQG3RZHU´&RQIHUHQFHRQ Wind Power for the 21 st Century,Large-scale baseload wind power in China. Natural Resourceseconomics of large-scale wind power in a carbon constrained

  12. The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.

    E-Print Network [OSTI]

    Wiser, Ryan

    2014-01-01T23:59:59.000Z

    focused approach, a new wind generator located near theallow the output of the wind generator to displace the power

  13. The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.

    E-Print Network [OSTI]

    Wiser, Ryan

    2014-01-01T23:59:59.000Z

    Grid. 2006. Trans mission and Wind Energy: Capturing theour sample. 20% Wind Energy: Wind Deployment System (WinDS)and Renewable Energy (Wind & Hydropower Technologies

  14. The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.

    E-Print Network [OSTI]

    Wiser, Ryan

    2014-01-01T23:59:59.000Z

    turbines and compressed air energy storage for supplementalThe value of compressed air energy storage with wind inresources and compressed air energy storage (CAES). Energy

  15. The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.

    E-Print Network [OSTI]

    Wiser, Ryan

    2014-01-01T23:59:59.000Z

    3] U.S. Department of Energy (DOE). 2008. 20% Wind Energy by2030: Increasing Wind Energy ' s Contribution to U. S .Trans mission and Wind Energy: Capturing the Prevailing

  16. The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.

    E-Print Network [OSTI]

    Wiser, Ryan

    2014-01-01T23:59:59.000Z

    kV JCSP 765 kV and 800 kV HVDC Southern California Edison (2 345 kV ERCOT - TOS - 3 345 kV and HVDC ERCOT - TOS - 4345 kV and HVDC Southwest Power Pool (SPP) SPP - 2 345 kV

  17. The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.

    E-Print Network [OSTI]

    Wiser, Ryan

    2014-01-01T23:59:59.000Z

    M. , 2009. 2008 Wind Technologies Market Report . DOE/GO-Reports.htm Quanta Technology, LLC. 2008. F inal Report onpublications/Quanta_Technology_March_2_2008_Update_to_the_

  18. Korean oxygenates rule sparks MTBE capacity plans

    SciTech Connect (OSTI)

    Kim, Hyung-Jin

    1994-06-15T23:59:59.000Z

    The Korean government`s strict standard for gasoline sold domestically is expected to have a significant impact on the methyl tert-butyl ether (MTBE) market. The mandate-requiring gasoline oxygen content of 0.5% this year, 0.75% by 1996, and 1.0% by 1998-has sparked a rush by Korean refineries to build new MTBE plants. If expansion plans are carried out, Korea`s MTBE capacity will increase from 280,000 m.t./year to 650,000 m.t./year by 1996, far surpassing predicted demand. Honam Oil, part of the Lucky Group, plans startup of a 100,000-m.t./year unit at Yeochon by early 1996. In addition, by the end of 1996 Ssangyong Oil will bring a 100,000-m.t./year unit onstream.

  19. Conductive Channel for Energy Transmission

    SciTech Connect (OSTI)

    Apollonov, Victor V. [A.M. Prokhorov General Physics Institute, Vavilov Str. 38, Moscow, 119991 (Russian Federation)

    2011-11-10T23:59:59.000Z

    For many years the attempts to create conductive channels of big length were taken in order to study the upper atmosphere and to settle special tasks, related to energy transmission. There upon the program of creation of 'Impulsar' represents a great interest, as this program in a combination with high-voltage high repetition rate electrical source can be useful to solve the above mentioned problems (N. Tesla ideas for the days of high power lasers). The principle of conductive channel production can be shortly described as follows. The 'Impulsar' - laser jet engine vehicle - propulsion take place under the influence of powerful high repetition rate pulse-periodic laser radiation. In the experiments the CO{sub 2}-laser and solid state Nd:YAG laser systems had been used. Active impulse appears thanks to air breakdown (<30 km) or to the breakdown of ablated material on the board (>30 km), placed in the vicinity of the focusing mirror-acceptor of the breakdown waves. With each pulse of powerful laser the device rises up, leaving a bright and dense trace of products with high degree of ionization and metallization by conductive nano-particles due to ablation. Conductive dust plasma properties investigation in our experiments was produced by two very effective approaches: high power laser controlled ablation and by explosion of wire. Experimental and theoretical results of conductive canal modeling will be presented. The estimations show that with already experimentally demonstrated figures of specific thrust impulse the lower layers of the Ionosphere can be reached in several ten seconds that is enough to keep the high level of channel conductivity and stability with the help of high repetition rate high voltage generator. Some possible applications for new technology are highlighted.

  20. 65 Contingency Planning Issues CONTINGENCY PLANNING ISSUES

    E-Print Network [OSTI]

    . The plan relies on a mixed strategy response to an energy shortage. The plan uses a free market approach to local jurisdic- tions, economic considerations, revisions to the California Energy Shortage Contingency multiple jurisdictions or agencies. LOCAL GOVERNMENT ASSISTANCE PROGRAM The purpose of the Energy

  1. Hydrogen Delivery Technologies and Pipeline Transmission of Hydrogen

    E-Print Network [OSTI]

    Hydrogen Delivery Technologies and Systems Pipeline Transmission of Hydrogen Strategic Initiatives, and Infrastructure Technologies Program #12;Pipeline Transmission of Hydrogen --- 2 Copyright: Design & Operation development) #12;Pipeline Transmission of Hydrogen --- 3 Copyright: Future H2 Infrastructure Wind Powered

  2. Spatially and polarization resolved plasmon mediated transmission through continuous metal

    E-Print Network [OSTI]

    Boyer, Edmond

    Spatially and polarization resolved plasmon mediated transmission through continuous metal films Y transmission through an embedded undulated continuous thin metal film under normal incidence. 1D undulations resolved, polarization independent transmission. Whereas the needed submicron microstructure lends itself

  3. MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES

    E-Print Network [OSTI]

    Ramdani, Karim - Institut de Mathématiques �lie Cartan, Université Henri Poincaré

    MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES ANNE-SOPHIE BONNET propagation in the microstrip transmission lines used in microelectronics. In the first part, the case of the perfectly conducting strip. Key words. superconducting transmission lines, waveguides, spectral analysis

  4. Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines

    E-Print Network [OSTI]

    Gander, Martin J.

    Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines Martin Gander problem for multiple coupled transmission lines by a so-called transverse partitioning technique. The WR mode transmission line problems. Previous longitudinal partitioning work using the classical WR

  5. CHARACTERIZING LOSSES IN MICROSTRIP TRANSMISSION LINES Rashmi Pathak

    E-Print Network [OSTI]

    Timbie, Peter

    CHARACTERIZING LOSSES IN MICROSTRIP TRANSMISSION LINES by Rashmi Pathak A dissertation submitted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1 Transmission Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2 Engineering) at the UNIVERSITY OF WISCONSIN­MADISON Summer 2005 #12;i Characterizing Losses in Transmission

  6. Investigation of Multi-Frequency Power Transmission and System

    E-Print Network [OSTI]

    Barazarte Conte, Ronald

    2012-10-19T23:59:59.000Z

    BACKGROUND .................................................................................. 6 A. High Voltage Direct Current Transmission (HVDC) ................ 6 B. Flexible AC Transmission System (FACTS) ............................ 12... ......................................................................................................................... 80 viii LIST OF FIGURES FIGURE Page 1 Schematic of a HVDC Transmission Line...

  7. Electrical Transmission Line Diametrical Retention Mechanism

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

    2006-01-03T23:59:59.000Z

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

  8. Load-resistant coaxial transmission line

    DOE Patents [OSTI]

    Hall, David R.; Fox, Joe

    2006-01-03T23:59:59.000Z

    A transmission line for downhole tools that make up all or part of a tool string for drilling and production of oil, gas, and geothermal wells that can withstand the dynamic gravitational forces and other accelerations associated with downhole excavations. The transmission line has a metal tube, or outer conductor, that houses a coaxial wire inner conductor. A non-metallic dielectric material is interposed between the inner and outer conductors. The outer and inner conductors and the dielectric are sufficiently compressed together so that independent motion between them is abated. Compression of the components of the transmission line may be achieved by drawing the transmission through one or more dies in order to draw down the outer conductor onto the dielectric, or by expanding the inner conductor against the dielectric using a mandrel or hydraulic pressure. Non-metallic bead segments may be used in aid of the compression necessary to resist the dynamic forces and accelerations of drilling.

  9. Transmission policy in the United States

    E-Print Network [OSTI]

    Joskow, Paul L.

    2004-01-01T23:59:59.000Z

    This paper provides an overview of the development of electric power transmission access, pricing and investment policies in the U.S. over the last 15 years and evaluates the current state of those policies. Pre-liberalization ...

  10. Data transmission element for downhole drilling components

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT)

    2006-01-31T23:59:59.000Z

    A robust data transmission element for transmitting information between downhole components, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The data transmission element components include a generally U-shaped annular housing, a generally U-shaped magnetically conductive, electrically insulating element such as ferrite, and an insulated conductor. Features on the magnetically conducting, electrically insulating element and the annular housing create a pocket when assembled. The data transmission element is filled with a polymer to retain the components within the annular housing by filling the pocket with the polymer. The polymer can bond with the annular housing and the insulated conductor but preferably not the magnetically conductive, electrically insulating element. A data transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe.

  11. Transmission Issues and Power Exchanges in Texas

    E-Print Network [OSTI]

    Hughes, H. L.

    to build. This paper presents a historical background on the development of the transmission system and describes the problems of assessing the impact and properly pricing certain bulk power transactions. In addition, it briefly describes the Electro...

  12. Electric Power Generation and Transmission (Iowa)

    Broader source: Energy.gov [DOE]

    Electric power generating facilities with a combined capacity greater than 25 MW, as well as associated transmission lines, may not be constructed or begin operation prior to the issuance of a...

  13. On equivalence of high temperature series expansion and coupling parameter series expansion in thermodynamic perturbation theory of fluids

    SciTech Connect (OSTI)

    Sai Venkata Ramana, A., E-mail: asaivenk@barc.gov.in [Theoretical Physics Division, Bhabha Atomic Research Centre, Mumbai 400 085 (India)

    2014-04-21T23:59:59.000Z

    The coupling parameter series expansion and the high temperature series expansion in the thermodynamic perturbation theory of fluids are shown to be equivalent if the interaction potential is pairwise additive. As a consequence, for the class of fluids with the potential having a hardcore repulsion, if the hard-sphere fluid is chosen as reference system, the terms of coupling parameter series expansion for radial distribution function, direct correlation function, and Helmholtz free energy follow a scaling law with temperature. The scaling law is confirmed by application to square-well fluids.

  14. Value of Options in Airport Expansion - Example of AICM

    E-Print Network [OSTI]

    Morgado, Frederico

    Investments decisions for airport capacity expansion are usually taken, either when demand exceeds the current capacity and the airport is working under congestion, or when current demand is expected to overcome current ...

  15. Expansion Joint Concepts for High Temperature Insulation Systems

    E-Print Network [OSTI]

    Harrison, M. R.

    1980-01-01T23:59:59.000Z

    EXPANSION JOINT CONCEPTS FOR HIGH TEMPERATURE INSULATION SYSTEMS Michael R. Harrison Johns-Manville Sales Corporation ";.,' Denver, Colorado ABSTRACT As high temperature steam and process piping expands with heat, joints beg in to open...

  16. Ion emission and expansion in laser-produced tin plasma

    E-Print Network [OSTI]

    Burdt, Russell Allen

    2011-01-01T23:59:59.000Z

    scale length laser-produced tin plasmas, PhD dissertation,and Expansion in Laser-Produced Tin Plasma A dissertationof a CO 2 laser pulse with tin-based plasma for an extreme

  17. Expansion of the Volpentest Hazardous Materials Management and...

    Broader source: Energy.gov (indexed) [DOE]

    federal, state, and private lands. A total of 60,254 acres (24,384 hectares) within the Hanford Site burned, including areas in and around the HAMMER expansion. Fire suppression...

  18. Cropland expansion changes deforestation dynamics in the southern Brazilian Amazon

    E-Print Network [OSTI]

    Camara, Gilberto

    Cropland expansion changes deforestation dynamics in the southern Brazilian Amazon Douglas C ranching or new deforestation has not been quantified and has major implications for future deforestation dynamics, carbon fluxes, forest fragmentation, and other ecosystem services. We combine deforestation maps

  19. Pressure recovery in a radiused sudden expansion Barton L. Smith

    E-Print Network [OSTI]

    Smith, Barton L.

    Pressure recovery in a radiused sudden expansion Barton L. Smith Abstract Experiments on a steady were motivated by a similar study for oscillatory flow in the same geometry. Smith and Swift (2003

  20. How are Feynman graphs resumed by the Loop Vertex Expansion?

    E-Print Network [OSTI]

    Vincent Rivasseau; Zhituo Wang

    2010-06-23T23:59:59.000Z

    The purpose of this short letter is to clarify which set of pieces of Feynman graphs are resummed in a Loop Vertex Expansion, and to formulate a conjecture on the $\\phi^4$ theory in non-integer dimension.

  1. Train track expansions of measured foliations February 16, 2003

    E-Print Network [OSTI]

    Mosher, Lee

    Train track expansions of measured foliations Lee Mosher February 16, 2003 Contents 1 Introduction foliations . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 1.5 Train tracks and train track's classification of mapping classes . . . . . . . . . . . . . . 47 3 Train tracks 49 3.1 Pretracks

  2. Train track expansions of measured foliations December 28, 2003

    E-Print Network [OSTI]

    Mosher, Lee

    Train track expansions of measured foliations Lee Mosher December 28, 2003 Contents 1 Introduction foliations . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 1.5 Train tracks and train track's classification of mapping classes . . . . . . . . . . . . . . 53 3 Train tracks 55 3.1 Pretracks

  3. Motion Planning Jana Kosecka

    E-Print Network [OSTI]

    Kosecka, Jana

    Slides thanks to http://cs.cmu.edu/~motionplanning, Jyh-Ming Lien Hard Motion Planning · Configuration Geometric Models S Sampling Based Motion Planner Discrete Search C-space planning Idea : Generate random

  4. Virginia Energy Plan (Virginia)

    Broader source: Energy.gov [DOE]

    The 2010 Virginia Energy Plan affirms the state's support for the development of renewable energy. The Plan assesses the state’s energy picture through an examination of the state’s primary energy...

  5. Planning the Project Meeting

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10T23:59:59.000Z

    Project group meetings must be planned well in advance. Members should be involved in completing some type of work before the next meeting. This helps the leader plan the next project meeting and makes efficient use of time....

  6. Sustainabiliity Sustainability Plan

    E-Print Network [OSTI]

    Heller, Barbara

    Sustainabiliity IIT Campus Sustainability Plan 2010­2020 Published Fall Semester 2010 www.iit.edu/campus_sustainability #12;IIT Campus Sustainability Plan 2010-2020 Fall Semester 2010 1 Section I: Background Sustainability ...................................................................................................................................................................8 IIT Academic Entities on Sustainability

  7. Hoisting & Rigging Lift Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Stanford Synchrotron Radiation Laboratory May 16, 2005 SSRL-HRLP-000-R0 Page 3 of 3 Guidelines for Generating a Rigging Sketch The lift plan required a rigging sketch or...

  8. EIS-0447: Champlain Hudson Power Express Transmission Line Project...

    Broader source: Energy.gov (indexed) [DOE]

    7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the...

  9. Transmission Reliability "Load as a Resource" Peer Review Materials...

    Broader source: Energy.gov (indexed) [DOE]

    Transmission Reliability "Load as a Resource" Peer Review Materials Now Available Transmission Reliability "Load as a Resource" Peer Review Materials Now Available September 25,...

  10. EA-1880: Big Bend to Witten Transmission Line Project, South...

    Office of Environmental Management (EM)

    880: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with...

  11. OAHU Wind Integration And Transmission Study: Summary Report...

    Office of Environmental Management (EM)

    OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory) OAHU Wind Integration And Transmission Study: Summary Report, NREL...

  12. Eastern Wind Integration and Transmission Study: Executive Summary...

    Office of Environmental Management (EM)

    Eastern Wind Integration and Transmission Study: Executive Summary and Project Overview Eastern Wind Integration and Transmission Study: Executive Summary and Project Overview This...

  13. Phase 2 Report: Oahu Wind Integration and Transmission Study...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba...

  14. 2006 National Electric Transmission Congestion Study and Related...

    Broader source: Energy.gov (indexed) [DOE]

    6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion...

  15. Draft National Electric Transmission Congestion Study Now Available...

    Broader source: Energy.gov (indexed) [DOE]

    Draft National Electric Transmission Congestion Study Now Available for Public Comment Draft National Electric Transmission Congestion Study Now Available for Public Comment August...

  16. In-situ Transmission Electron Microscopy and Spectroscopy Studies...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Electron Microscopy and Spectroscopy Studies of Interfaces in Li-ion Batteries: Challenges and In-situ Transmission Electron Microscopy and Spectroscopy Studies of...

  17. Factsheet: An Initiative to Help Modernize Natural Gas Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Factsheet: An Initiative to Help Modernize Natural Gas Transmission and Distribution Infrastructure Factsheet: An Initiative to Help Modernize Natural Gas Transmission and...

  18. QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution Meeting Date and...

  19. QER Public Meeting in Portland, OR: Electricity Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Portland, OR: Electricity Transmission, Storage and Distribution - West QER Public Meeting in Portland, OR: Electricity Transmission, Storage and Distribution - West Meeting Date...

  20. QER Public Meeting in Newark, NJ: Electricity Transmission and...

    Energy Savers [EERE]

    Newark, NJ: Electricity Transmission and Distribution - East QER Public Meeting in Newark, NJ: Electricity Transmission and Distribution - East New Jersey Institute of Technology...

  1. 2012 Transmission and Energy Storage Peer Review Presentations...

    Broader source: Energy.gov (indexed) [DOE]

    Transmission and Energy Storage Peer Review Presentations Available 2012 Transmission and Energy Storage Peer Review Presentations Available December 3, 2012 - 1:26pm Addthis...

  2. Request for Information on Permitting of Transmission Lines:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

  3. EIS-0325: Schultz-Hanford Area Transmission Line Project, WA

    Broader source: Energy.gov [DOE]

    BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

  4. Eastern Wind Integration and Transmission Study -- Preliminary Findings: Preprint

    SciTech Connect (OSTI)

    Corbus, D.; Milligan, M.; Ela, E.; Schuerger, M.; Zavadil, B.

    2009-09-01T23:59:59.000Z

    This paper reviews the Eastern Wind Integration and Transmission Study, the development of wind datasets, the transmission analysis, and the results of wind integration analysis for four scenarios.

  5. QER Public Meeting in New Orleans, LA: Petroleum Product Transmission...

    Energy Savers [EERE]

    Orleans, LA: Petroleum Product Transmission & Distribution QER Public Meeting in New Orleans, LA: Petroleum Product Transmission & Distribution Meeting Date and Location: May 27,...

  6. Dynamics of soft Nanomaterials captured by transmission electron...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dynamics of soft Nanomaterials captured by transmission electron microscopy in liquid water. Dynamics of soft Nanomaterials captured by transmission electron microscopy in liquid...

  7. DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 The purpose of...

  8. An Annotated Bibliography of High-Voltage Direct-Current Transmission and Flexible AC Transmission (FACTS) Devices, 1991-1993.

    SciTech Connect (OSTI)

    Litzenberger, Wayne; Lava, Val

    1994-08-01T23:59:59.000Z

    References are contained for HVDC systems, converter stations and components, overhead transmission lines, cable transmission, system design and operations, simulation of high voltage direct current systems, high-voltage direct current installations, and flexible AC transmission system (FACTS).

  9. Training Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for systemsoftware development and...

  10. Waste Management Quality Assurance Plan

    E-Print Network [OSTI]

    Waste Management Group

    2006-01-01T23:59:59.000Z

    Revision 6 Waste Management Quality Assurance Plan Waste6 WM QA Plan Waste Management Quality Assurance Plan LBNL/4 Management Quality Assurance

  11. Cryogenic Thermal Expansion of Y-12 Graphite Fuel Elements

    SciTech Connect (OSTI)

    Eash, D. T.

    2013-07-08T23:59:59.000Z

    Thermal expansion measurements betwccn 20°K and 300°K were made on segments of three uranium-loaded Y-12 uncoated graphite fuel elements. The thermal expansion of these fuel elements over this temperature range is represented by the equation: {Delta}L/L = -39.42 x 10{sup -5} + 1.10 x 10{sup -7} T + 6.47 x 10{sup -9} T{sup 2} - 8.30 x 10{sup -12} T{sup 3}.

  12. Business Planning Resources

    Broader source: Energy.gov [DOE]

    Business Planning Resources, a presentation of the U.S. Department of Energy's Better Buildings Neighborhood Program.

  13. Greensburg Sustainable Comprehensive Plan

    High Performance Buildings Database

    Greensburg, KS In October 2007, the architectural and planning firm, BNIM, was selected formally by the City of Greensburg, with support from the USDA, to prepare the first phase of a comprehensive master plan to rebuild the city, which provides a framework for the rebuilding of Greensburg based around the principles of economic, social and environmental sustainability. The BNIM Planning team presented the final draft of Greensburg's Comprehensive Plan to the City Council and to a public hearing on January 16, 2008.

  14. WECC 10-Year Plan general presentation

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf The 2012NuclearBradley Nickell Director of Transmission Planning -

  15. Multiperiod Refinery Planning Optimization

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    Multiperiod Refinery Planning Optimization with Nonlinear CDU Models Abdulrahman Alattas, Advisor #12;Refinery Planning Model Development 2 Extension to Multiperiod Planning #12;3 Multiperiod Refinery: refinery configuration Determine · What crude oil to process and in which time period? · The quantities

  16. University Libraries Technology Plan

    E-Print Network [OSTI]

    Moore, Paul A.

    Libraries Bowling Green State University #12;Table of Contents Introduction ..................................................................19 Page 2 of 19 Technology Plan, 2003-2005 University Libraries Bowling Green State University #12University Libraries Technology Plan 2003-2005 Page 1 of 19 Technology Plan, 2003-2005 University

  17. University of Operations Plan

    E-Print Network [OSTI]

    Firestone, Jeremy

    Management Plan Office of Campus and Public Safety University of Delaware Critical Incident Management Plan Management Plan Office of Campus and Public Safety - 4 - University of Delaware Critical Incident Management and Public Safety - 5 - County of New Castle CD-30 911 Center/Communications CD-31 Department of Police CD-32

  18. Motion Planning Jana Kosecka

    E-Print Network [OSTI]

    Kosecka, Jana

    1 Motion Planning Jana Kosecka Department of Computer Science · Discrete planning, graph search://cs.cmu.edu/~motionplanning, Jyh-Ming Lien State space · Set of all possible states is represented as graph · Nodes states, links planning ­ generate a set of actions, if the solution exists it must be found in the finite time · Search

  19. Corporate and Business Plan

    E-Print Network [OSTI]

    Corporate and Business Plan 2010-2011 #12;Main addresses Forest Research Alice Holt Lodge Farnham Research's Business Plan 2010-2011 ..........................12 Table Contents Table 1 - Income This Corporate and Business Plan sets out FR's aims and strategic objectives. It describes the Key Performance

  20. The Political History of Hydraulic Fracturing’s Expansion Across the West

    E-Print Network [OSTI]

    Forbis, Robert E.

    2014-01-01T23:59:59.000Z

    Political History of Hydraulic Fracturing’s Expansion AcrossPolitical History of Hydraulic Fracturing’s Expansion Acrosss use of the hydraulic fracturing development process.

  1. Convex Quadratic Relaxations for Mixed-Integer Nonlinear ...

    E-Print Network [OSTI]

    H. Hijazi, C. Coffrin and P. Van Hentenryck

    2014-06-03T23:59:59.000Z

    35], energy market calculations [39,37], transmission switching [16,18], dis- tribution network configuration [1], capacitor placement [3,14,22], expansion planning ...

  2. Coordination of Retail Demand Response with Midwest ISO Markets

    E-Print Network [OSTI]

    Bharvirkar, Ranjit

    2008-01-01T23:59:59.000Z

    M T E P 06 - The Midwest ISO Transmission Expansion Plan,Demand Response in Midwest ISO Market," Presentation at MISODemand Response with Midwest ISO Wholesale Markets Ranjit

  3. Flexible Transmission in the Smart Grid

    E-Print Network [OSTI]

    Hedman, Kory Walter

    2010-01-01T23:59:59.000Z

    2004) Entrepreneur, “PJM scheduling software saves customersHerling, S. R. , VP-Planning, PJM, Norristown, PA, privateimplementations in the PJM markets,” HEPG Forty-Ninth

  4. Business Plans for Agricultural Producers

    E-Print Network [OSTI]

    McCorkle, Dean; Bevers, Stan

    2008-10-17T23:59:59.000Z

    Natural resources Z Strengths, weaknesses, opportunities ? and threats (SWOT) Mission statement ? Objectives and goals ? Production plan ? Financial plan ? Market plan ? Legal and liability issues ? Insurance ? Succession and estate planning...

  5. CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN

    E-Print Network [OSTI]

    Oliver, Douglas L.

    Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 Human Resources #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

  6. CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN

    E-Print Network [OSTI]

    Kim, Duck O.

    Department 2588 Hospital Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

  7. Operating plan FY 1998

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  8. Hypersonic expansion of the Fokker--Planck equation

    SciTech Connect (OSTI)

    Fernandez-Feria, R.

    1989-02-01T23:59:59.000Z

    A systematic study of the hypersonic limit of a heavy species diluted in a much lighter gas is made via the Fokker--Planck equation governing its velocity distribution function. In particular, two different hypersonic expansions of the Fokker--Planck equation are considered, differing from each other in the momentum equation of the heavy gas used as the basis of the expansion: in the first of them, the pressure tensor is neglected in that equation while, in the second expansion, the pressure tensor term is retained. The expansions are valid when the light gas Mach number is O(1) or larger and the difference between the mean velocities of light and heavy components is small compared to the light gas thermal speed. They can be applied away from regions where the spatial gradient of the distribution function is very large, but it is not restricted with respect to the temporal derivative of the distribution function. The hydrodynamic equations corresponding to the lowest order of both expansions constitute two different hypersonic closures of the moment equations. For the subsequent orders in the expansions, closed sets of moment equations (hydrodynamic equations) are given. Special emphasis is made on the order of magnitude of the errors of the lowest-order hydrodynamic quantities. It is shown that if the heat flux vanishes initially, these errors are smaller than one might have expected from the ordinary scaling of the hypersonic closure. Also it is found that the normal solution of both expansions is a Gaussian distribution at the lowest order.

  9. Puget Sound area electric reliability plan. Draft environmental impact statement

    SciTech Connect (OSTI)

    Not Available

    1991-09-01T23:59:59.000Z

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  10. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01T23:59:59.000Z

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  11. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    management systems need clarification - Consolidated planning annual timetable needed for efficiency * Organizational rolesresponsibilities need alignment to defined planning...

  12. Hydraulic system for a ratio change transmission

    DOE Patents [OSTI]

    Kalns, Ilmars (Northville, MI)

    1981-01-01T23:59:59.000Z

    Disclosed is a drive assembly (10) for an electrically powered vehicle (12). The assembly includes a transaxle (16) having a two-speed transmission (40) and a drive axle differential (46) disposed in a unitary housing assembly (38), an oil-cooled prime mover or electric motor (14) for driving the transmission input shaft (42), an adapter assembly (24) for supporting the prime mover on the transaxle housing assembly, and a hydraulic system (172) providing pressurized oil flow for cooling and lubricating the electric motor and transaxle and for operating a clutch (84) and a brake (86) in the transmission to shift between the two-speed ratios of the transmission. The adapter assembly allows the prime mover to be supported in several positions on the transaxle housing. The brake is spring-applied and locks the transmission in its low-speed ratio should the hydraulic system fail. The hydraulic system pump is driven by an electric motor (212) independent of the prime mover and transaxle.

  13. The inherent inefficiency of simultaneously feasible financial transmission rights auctions

    E-Print Network [OSTI]

    Oren, Shmuel S.

    Electricity auction Simultaneous feasibility Transmission pricing Empirical evidence from the New York ISO

  14. Questions and Issues on Hydrogen Pipeline Transmission of Hydrogen

    E-Print Network [OSTI]

    Questions and Issues on Hydrogen Pipelines Pipeline Transmission of Hydrogen Doe Hydrogen Pipeline Working Group Meeting August 31, 2005 #12;Pipeline Transmission of Hydrogen --- 2 Copyright: Air Liquide Transmission of Hydrogen --- 3 Copyright: #12;Pipeline Transmission of Hydrogen --- 4 Copyright: 3. Special

  15. Downhole transmission system comprising a coaxial capacitor

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Pixton, David S. (Lehi, UT); Johnson, Monte L. (Orem, UT); Bartholomew, David B. (Springville, UT); Hall, Jr., H. Tracy (Provo, UT); Rawle, Michael (Springville, UT)

    2011-05-24T23:59:59.000Z

    A transmission system in a downhole component comprises a plurality of data transmission elements. A coaxial cable having an inner conductor and an outer conductor is disposed within a passage in the downhole component such that at least one capacitor is disposed in the passage and having a first terminal coupled to the inner conductor and a second terminal coupled to the outer conductor. Preferably the transmission element comprises an electrically conducting coil. Preferably, within the passage a connector is adapted to electrically connect the inner conductor of the coaxial cable and the lead wire. The coaxial capacitor may be disposed between and in electrically communication with the connector and the passage. In another embodiment a connector is adapted to electrical connect a first and a second portion of the inner conductor of the coaxial cable and a coaxial capacitor is in electrical communication with the connector and the passage.

  16. Natural Gas Transmission and Distribution Model of the National Energy Modeling System. Volume 1

    SciTech Connect (OSTI)

    NONE

    1998-01-01T23:59:59.000Z

    The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. The NGTDM is the model within the NEMS that represents the transmission, distribution, and pricing of natural gas. The model also includes representations of the end-use demand for natural gas, the production of domestic natural gas, and the availability of natural gas traded on the international market based on information received from other NEMS models. The NGTDM determines the flow of natural gas in an aggregate, domestic pipeline network, connecting domestic and foreign supply regions with 12 demand regions. The purpose of this report is to provide a reference document for model analysts, users, and the public that defines the objectives of the model, describes its basic design, provides detail on the methodology employed, and describes the model inputs, outputs, and key assumptions. Subsequent chapters of this report provide: an overview of NGTDM; a description of the interface between the NEMS and NGTDM; an overview of the solution methodology of the NGTDM; the solution methodology for the Annual Flow Module; the solution methodology for the Distributor Tariff Module; the solution methodology for the Capacity Expansion Module; the solution methodology for the Pipeline Tariff Module; and a description of model assumptions, inputs, and outputs.

  17. A Model and Approach for Optimal Power Systems Planning and Investment

    E-Print Network [OSTI]

    Oren, Shmuel S.

    amounts of energy from wind and solar generators, batteries, and demand- side market participants. Some incorporates the detailed gener- ator, topology and operational aspects found in production cost planning expected benefits, while also representing generic generation expansions under the same objective

  18. Bi-level Optimization for Capacity Planning in Industrial Gas Markets

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    Bi-level Optimization for Capacity Planning in Industrial Gas Markets P. Garcia-Herreros, E. Arslan are dynamic: · Suppliers must anticipate demand growth · Most markets are served locally Capacity expansion supplier · Set of plants from independent suppliers with limited capacity · Rational markets that select

  19. EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada

    Broader source: Energy.gov [DOE]

    This EIS, being prepared jointly by DOE’s Western Area Power Administration and the Department of the Interior’s Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project.

  20. TEMPERATURE DEPENDENT CREEP EXPANSION OF Ti-6Al-4V LOW DENSITY CORE SANDWICH STRUCTURES

    E-Print Network [OSTI]

    Wadley, Haydn

    by their high manufacturing costs. Interest has therefore developed in an entrapped gas expansion process entrapped gas expansion processing the driving force governing the re-expansion step is the internal pore of the expansion itself (an increase in void volume lowers the gas pressure) or because of gas lost through