Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

2

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

3

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

4

Estimating the Actual Cost of Transmission System Congestion  

E-Print Network [OSTI]

of the utility's generation, load and tie-line flows over the study time period. Due to the common lack by most be used by a utility to estimate the actual cost of congestion on its transmission system using limited interconnected grid (i.e., the Eastern Interconnect), costs for the utility's generators, and then hourly values

5

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

SciTech Connect (OSTI)

The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS and WinDS). The authors and general location of the 40 detailed transmission studies included in our review are illustrated in Figure ES-1. As discussed in the body of the report, these studies vary considerably in scope, authorship, objectives, methodology, and tools. Though we recognize this diversity and are cognizant that comparisons among these studies are therefore somewhat inappropriate, we nonetheless emphasize such simple comparisons in this report. We do so in order to improve our understanding of the range of transmission costs needed to access greater quantities of wind, and to highlight some of the drivers of those costs. In so doing, we gloss over many important details and differences among the studies in our sample. In emphasizing simple comparisons, our analysis focuses primarily on the unit cost of transmission implied by each of the studies. The unit cost of transmission for wind in $/kW terms on a capacity-weighted basis is estimated by simply dividing the total transmission cost in a study by the total amount of incremental generation capacity (wind and non-wind) modeled in that study. In so doing, this metric assumes that within any individual study all incremental generation capacity imposes transmission costs in proportion to its nameplate capacity rating. The limitations to this approach are described in some detail in the body of the report.

Mills, Andrew D.; Wiser, Ryan; Porter, Kevin

2009-02-02T23:59:59.000Z

6

Report on Transmission Cost Allocation for RTOs and Others (Presentation)  

SciTech Connect (OSTI)

This presentation describes in summary fashion some present transmission cost allocation methods, especially as this relates to the development of utility-scale renewable power sources.

Coles, L.; Porter, K.

2011-05-01T23:59:59.000Z

7

Electricity transmission congestion costs: A review of recent reports  

SciTech Connect (OSTI)

Recently, independent system operators (ISOs) and others have published reports on the costs of transmission congestion. The magnitude of congestion costs cited in these reports has contributed to the national discussion on the current state of U.S. electricity transmission system and whether it provides an adequate platform for competition in wholesale electricity markets. This report reviews reports of congestion costs and begins to assess their implications for the current national discussion on the importance of the U.S. electricity transmission system for enabling competitive wholesale electricity markets. As a guiding principle, we posit that a more robust electricity system could reduce congestion costs; and thereby, (1) facilitate more vibrant and fair competition in wholesale electricity markets, and (2) enable consumers to seek out the lowest prices for electricity. Yet, examining the details suggests that, sometimes, there will be trade-offs between these goals. Therefore, it is essential to understand who pays, how much, and how do they benefit in evaluating options (both transmission and non-transmission alternatives) to address transmission congestion. To describe the differences among published estimates of congestion costs, we develop and motivate three ways by which transmission congestion costs are calculated in restructured markets. The assessment demonstrates that published transmission congestion costs are not directly comparable because they have been developed to serve different purposes. More importantly, critical information needed to make them more comparable, for example in order to evaluate the impacts of options to relieve congestion, is sometimes not available.

Lesieutre, Bernard C.; Eto, Joseph H.

2003-10-01T23:59:59.000Z

8

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

of incremental wind development. At the extreme, still otherextreme assumption, the implied unit cost of transmission for windon wind power in their analysis. On one extreme, a number of

Mills, Andrew D.

2009-01-01T23:59:59.000Z

9

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

500 and 230 kV 765 kV and 800 kV HVDC 500 and 230 kV 500 kVmi) 138 and 345 kV 345 kV 345 kV 345 kV and HVDC 345kV and HVDC 345 kV 345 kV Note: Total transmission cost is

Mills, Andrew D.

2009-01-01T23:59:59.000Z

10

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

2007. “Inclusion of Wind in the MISO Transmission Expansionhttp://www.jcspstudy.org/ Midwest ISO (MISO). 2007. Midwest+Planning Midwest ISO (MISO). 2003. Midwest Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

11

A reliability cost-benefit analysis for HVDC transmission expansion planning  

SciTech Connect (OSTI)

A major portion of Manitoba Hydro's generation is located in the North on the Nelson River. The lower Nelson River generation is brought into the load centre in Southern Manitoba through an HVDC transmission system consisting of two bipoles, the first rated at 1680 MW at the rectifier and the second at 2000 MW. This paper presents the methodology used in arriving at the optimum Bipole 3 size using a reliability cost-benefit analysis. The analysis considers the forced outages of the generation and transmission systems using system outage statistics. The generator and valve group maintenance and the reduction in capability of thyristor valve groups during the summer season were also incorporated in the analysis. The load model used in the study was based on system data for the period 1980-1984. The criterion used in choosing the Bipole 3 size is to optimize the present worth value of the annual energy curtailment due to the HVDC system forced outages and the incremental installation cost of the transmission as the capacity of Bipole 3 is increased. The optimum Bipole 3 size based on the study is 2200 MW. This value is significantly lower than that based on a pole spare criterion used in the earlier development of the HVDC system. Finally, the need for validation of the outage data in evaluating future HVDC projects and the need for data collection and classification is indicated.

Kuruganty, P.R.S. (Manitoba Hydro, Winnipeg, Manitoba (CA)); Woodford, D.A. (Manitoba HVDC Research Centre, Winnipeg, Manitoba (CA))

1988-07-01T23:59:59.000Z

12

Electricity Transmission Pricing: How much does it cost to get it wrong?  

E-Print Network [OSTI]

PWP-058 Electricity Transmission Pricing: How much does it cost to get it wrong? Richard Green Channing Way Berkeley, California 94720-5180 www.ucei.berkeley.edu/ucei #12;Electricity Transmission optimal prices for electricity transmission. These are rarely applied in practice. This paper develops

California at Berkeley. University of

13

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network [OSTI]

Report.pdf Midwest ISO (MISO). 2003. Midwest TransmissionConference September 2007 MISO. 2007. Midwest Transmission2006 SDG&E Midwest ISO (MISO) ISO/RTO February 2007 MISO '06

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

14

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

2006. Transmission and Wind Energy: Capturing the Prevailingand Renewable Energy (Wind & Hydropower Technologiesand Renewable Energy Wind & Hydropower Technologies Program

Mills, Andrew D.

2009-01-01T23:59:59.000Z

15

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Interconnectivity.degree of network interconnectivity; and the level of studyof Transmission Network Interconnectivity A number of the

Mills, Andrew D.

2009-01-01T23:59:59.000Z

16

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

NREL/CP-500-35969. Global WindPower Conference. Chicago,Transmission Projects. ” Windpower 2007 Conference. Los

Mills, Andrew D.

2009-01-01T23:59:59.000Z

17

An empirical study of the economies of scale in AC transmission line construction costs  

E-Print Network [OSTI]

of the logarithm of the cost per unit capacity per unit length against various explanatory parameters: · the year is to empirically evaluate the cost of transmission projects built in the United States in the last decade using capacity of the line. That is, the cost per unit nominal capacity per unit length is roughly constant over

Baldick, Ross

18

Electricity Transmission Congestion Costs: A Review of Recent Reports  

E-Print Network [OSTI]

operator ISO-NE Independent System Operator - New England LMP Locational marginal price MW Megawatt MWh price FERC Federal Energy Regulatory Commission FTR Fixed transmission right ISO Independent system

19

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

2006. Transmission and Wind Energy: Capturing the Prevailing40 6.2 20% Wind Energy: Wind Deployment System (and Renewable Energy (Wind & Hydropower Technologies

Mills, Andrew D.

2009-01-01T23:59:59.000Z

20

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Planning (Xcel). 2006. Wind Integration Study Report OfTransmission Vision for Wind Integration. White Paper.Charles Smith (Utility Wind Integration Group), Lynn Coles (

Mills, Andrew D.

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Report on Transmission Cost Allocation for RTOs and Others (Presentation)  

SciTech Connect (OSTI)

Presented at the MARC 2011 Annual Conference, 6 June 2011, Rapid City, South Dakota. This presentation provides an overview of the latest research findings and policy developments pertaining to cost allocation and new variable generation resources on the power grid.

Coles, L.

2011-06-01T23:59:59.000Z

22

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

cost levelized using 15% per year levelizing factor (3) Energycost levelized using 15% per year levelizing factor (3) Energy

Mills, Andrew D.

2009-01-01T23:59:59.000Z

23

Costs of Land Subsidence Due to Groundwater Withdrawal  

E-Print Network [OSTI]

total. Of the $109.6 million, $53.2 million were incurred in 1973, principally due to a six foot tide. Probability of the occurrence of a six foot tide in any one year is 20 percent. Given five additional feet of subsidence in the study area...

Warren, J. P.; Jones, L. L.; Griffin, W. L.; Lacewell, R. D.

24

Using Natural Gas Transmission Pipeline Costs to Estimate Hydrogen Pipeline Costs  

E-Print Network [OSTI]

future estimates of hydrogen pipelines. Construction Cost (does this mean for hydrogen pipelines? The objective of thisinto the cost of hydrogen pipelines. To this end I will

Parker, Nathan

2004-01-01T23:59:59.000Z

25

To send or not to send: Reducing the cost of data transmission  

E-Print Network [OSTI]

such as energy, where companies are billed by the total volume of utility consumed. For network bandwidth the 95th percentile) cost model. In other words, the time slots with the top 5 percent (in the case of 95To send or not to send: Reducing the cost of data transmission Leana Golubchik, Samir Khuller

Khuller, Samir

26

COSTS OF WATER TREATMENT DUE TO DIMINISHED WATER QUALITY: A CASE STUDY IN TEXAS  

E-Print Network [OSTI]

COSTS OF WATER TREATMENT DUE TO DIMINISHED WATER QUALITY: A CASE STUDY IN TEXAS David Dearmont and Resources Portland State University P O Box 751 Portland OR 97207-0751 October, 1997 Draft of paper in Water Resources Research, 34(4), 849-854, 1998. #12;2 CHEMICAL COSTS OF WATER TREATMENT DUE TO DIMINISHED WATER

McCarl, Bruce A.

27

Cost estimation of HVDC transmission system of Bangka’s NPP candidates  

SciTech Connect (OSTI)

Regarding nuclear power plant development in Bangka Island, it can be estimated that produced power will be oversupply for the Bangka Island and needs to transmit to Sumatra or Java Island. The distance between the regions or islands causing considerable loss of power in transmission by alternating current, and a wide range of technical and economical issues. The objective of this paper addresses to economics analysis of direct current transmission system to overcome those technical problem. Direct current transmission has a stable characteristic, so that the power delivery from Bangka to Sumatra or Java in a large scale efficiently and reliably can be done. HVDC system costs depend on the power capacity applied to the system and length of the transmission line in addition to other variables that may be different.

Liun, Edwaren, E-mail: edwaren@batan.go.id; Suparman, E-mail: edwaren@batan.go.id [Centre for Nuclear Energy Development, National Nuclear Energy Agency of Indonesia (Indonesia)

2014-09-30T23:59:59.000Z

28

Cost-Effectivenessof PhotovoltaicGenerationIn A Transmission-Constrained Load Area of An InterconnectedSystem  

E-Print Network [OSTI]

Cost-Effectivenessof PhotovoltaicGenerationIn A Transmission-Constrained Load Area examines and evaluates the applicability and cost-effectiveness of Photovoltaic(PV) generation the construction of many large power stations with high efficiency, which were located far fi-om customer sites

Gross, George

29

Use of element model to evaluate transmissibility reduction due to barriers  

SciTech Connect (OSTI)

Water breakthrough has been observed a year earlier than expected in the productive Oseberg Formation in the Veslefrikk Field. Production data revealed extensive water override, whereas the opposite situation was expected based on a homogeneous and coarse flow simulation model. A new model was developed to include geological heterogeneities using a simple upscaling method. The Oseberg Fm. consists of an upper homogeneous unit (zone 2) and a lower unit containing thin barriers of shale and calcite cemented sandstone (zone 1). The barrier content varies laterally. When barriers are distributed in a complex 3D pattern, they reduce the upscaled horizontal transmissibility more than what is obtained by multiplying the sand permeability by the net-to-gross ratio (N/G). However, the transmissibility reduction strongly depends on the spatial distribution of barriers and their geometry. Therefore, a fine scale element model was used to derive the average transmissibility reduction as a function of N/G for alternative geological descriptions of the barriers. A geo-statistical method called General Marked Point Process was used to generate the fine scale descriptions. This work has resulted in a simple upscaling routine for horizontal transmissibility, which represents an effective bridge between geological evaluation of uncertainties and fluid flow simulation. The method combines geo-statistical and deterministic modelling in an elegant manner, recognising that most often these methods complement one another.

Svanes, T.; South, D.; Dronen, O.M. [Statoil, Bergen (Norway)

1997-08-01T23:59:59.000Z

30

Transmission Matters Now: How Will Power Market Regulations Impact the Industrial's Power Supply Costs and Reliability?  

E-Print Network [OSTI]

The standardization of the power market structure and transmission access rules will result in new rules for dealing with the transmission systems. Furthermore, transmission system limitations and market inadequacies will have a significant impact...

James, F.; Beidas, H.; Fox, R.

31

Electricity transmission pricing : how much does it cost to get it wrong?  

E-Print Network [OSTI]

Economists know how to calculate optimal prices for electricity transmission. These are rarely applied in practice. This paper develops a thirteen node model of the transmission system in England and Wales, incorporating ...

Green, Richard

2004-01-01T23:59:59.000Z

32

Transmission  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for Transmission ,...

33

Low-Cost Mitigation of Privacy Loss due to Radiometric Identification  

E-Print Network [OSTI]

.g., license plates) to obtain personal information is possible, such means require line-of-sight, whereas to lists, requires prior specific permission and/or a fee. VANET'11, September 23, 2011, Las Vegas, Nevada just VANETs. Because wireless transmissions hav

Hu, Yih-Chun

34

Current conflicts in U.S. Electric transmission planning, cost allocation and renewable energy policies: More heat than light?  

SciTech Connect (OSTI)

To surmount obstacles to expanding and upgrading the nation's transmission system that are impeding development of the renewables sector, it is critical that these issues be resolved quickly and on a consistent rather than ad hoc basis. (author)

Bloom, David; Forrester, J. Paul; Klugman, Nadav

2010-12-15T23:59:59.000Z

35

Planning electricity transmission to accommodate renewables: Using two-stage programming to evaluate flexibility and the cost of disregarding uncertainty  

E-Print Network [OSTI]

We develop a stochastic two-stage optimisation model that captures the multistage nature of electricity transmission planning under uncertainty and apply it to a stylised representation of the Great Britain (GB) network. In our model, a proactive...

van der Weijde, Adriaan Hendrik; Hobbs, Benjamin F.

2011-01-31T23:59:59.000Z

36

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect (OSTI)

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

37

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 16, NO. 4, NOVEMBER 2001 933 Discussion on "Review of Usage-Based Transmission Cost  

E-Print Network [OSTI]

analyzed different transmission pricing method- ologies which could be applied within a given system for transmission pricing of cross-border trades. This problem is very topical in the context of the North American or European interconnected networks. Because of the lack of consensus on the transmission pricing,

Catholic University of Chile (Universidad Católica de Chile)

38

SOLAR HEATING OF TANK BOTTOMS Application of Solar Heating to Asphaltic and Parrafinic Oils Reducing Fuel Costs and Greenhouse Gases Due to Use of Natural Gas and Propane  

SciTech Connect (OSTI)

The sale of crude oil requires that the crude meet product specifications for BS&W, temperature, pour point and API gravity. The physical characteristics of the crude such as pour point and viscosity effect the efficient loading, transport, and unloading of the crude oil. In many cases, the crude oil has either a very high paraffin content or asphalt content which will require either hot oiling or the addition of diluents to the crude oil to reduce the viscosity and the pour point of the oil allowing the crude oil to be readily loaded on to the transport. Marginal wells are significantly impacted by the cost of preheating the oil to an appropriate temperature to allow for ease of transport. Highly paraffinic and asphaltic oils exist throughout the D-J basin and generally require pretreatment during cold months prior to sales. The current study addresses the use of solar energy to heat tank bottoms and improves the overall efficiency and operational reliability of stripper wells.

Eugene A. Fritzler

2005-09-01T23:59:59.000Z

39

Transmission Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Return to Daylight Saving Time Posted: 2232015 Effective Date: 382015 This document provides the procedure for reserving and scheduling transmission that spans the time change...

40

HVDC power transmission technology assessment  

SciTech Connect (OSTI)

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

A Review of Recent RTO Benefit-Cost Studies: Toward More Comprehensive Assessments of FERC Electricity Restructuring Policies  

E-Print Network [OSTI]

3. Regional transmission pricing. 4. Retail access. 5.cost. Regional transmission pricing is designed to make each

Eto, Joseph H.; Lesieutre, Bernard C.

2005-01-01T23:59:59.000Z

42

Please cite this article in press as: E.J. Vergara, et al., EnergyBox: Disclosing the wireless transmission energy cost for mobile devices, Sustain. Comput.: Inform. Syst. (2014), http://dx.doi.org/10.1016/j.suscom.2014.03.008  

E-Print Network [OSTI]

transmission energy cost for mobile devices, Sustain. Comput.: Inform. Syst. (2014), http://dx.doi.org/10 environment of a major mobile operator in Sweden. A comparison with real power traces indicates that EnergyPlease cite this article in press as: E.J. Vergara, et al., EnergyBox: Disclosing the wireless

2014-01-01T23:59:59.000Z

43

Transmission Services J7000  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Business Unit - J7300 CRSP - DSW - RMR Open Access Transmission Tariff Management Transmission Service Requests Interconnection Requests OASIS...

44

Determining the lowest-cost hydrogen delivery mode  

E-Print Network [OSTI]

costs to estimate hydrogen pipeline costs. Davis, CA: ITS-hydrogen trucks, and hydrogen pipelines, were devel- opedFor large amounts of hydrogen, pipeline transmission is pre-

Yang, Christopher; Ogden, Joan M

2007-01-01T23:59:59.000Z

45

Regional Transmission Projects: Finding Solutions  

SciTech Connect (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

46

Transmission INTRODUCTION  

E-Print Network [OSTI]

, to a significant degree, on a well-functioning wholesale power market. The transmission system is integral the consequences of a poorly designed wholesale power market, and the Council does not want to see those Regulatory Commission began taking actions to further facilitate competition in wholesale power supply. Today

47

Startup Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

1997-03-28T23:59:59.000Z

48

Transmission Workshop  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof theRestorationAdvisoryManagement andTopKnow? |Transmission

49

E-Print Network 3.0 - alternating current transmission Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collection: Power Transmission, Distribution and Plants 4 The Cost of Transmission for Wind Energy: A Review of Summary: W, or roughly 25% of the current 2,000kW cost of...

50

COMM-OPINION-ORDER, 75 FERC 61,208, Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and  

E-Print Network [OSTI]

COMM-OPINION-ORDER, 75 FERC ¶61,208, Promoting Wholesale Competition Through Open Access Non Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities-7-001 [61,687] [¶61,208] Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission

Laughlin, Robert B.

51

NWCC Transmission Case Study III  

SciTech Connect (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

52

Phase 2 Report: Oahu Wind Integration and Transmission Study...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of...

53

Bibliography on transmission access issues  

SciTech Connect (OSTI)

This paper presents a bibliography on issues related to transmission access in electric power systems. There are 233 citations referenced in this bibliography. This bibliography presents a collection of selected literature on issues related to transmission access. It does not contain all of the material available on this subject or the categories contained herein. Some readers may feel that citations within this bibliography should be strictly limited to transmission system issues and not include energy pricing or reliability issues. However, it was the decision of the Subcommittee of the IEEE Task Force on Transmission Access and Nonutility Generation that selected entries relating to reliability and energy pricing, most relevant to transmission access, should be included. This decision was made because certain issues relating to reliability, transmission and energy pricing are perceived by the industry to be critical in the discussion of transmission access. The bibliography has been divided into the following sections or sub-sections: 2.0 Operational (Engineering) Issues, 3.0 Planning, 4.0 Reliability, 5.1 Economics: Costing, 5.2(a) Economics: Location-Differentiated Pricing, 5.2(b) Economics: Time-Differentiated Pricing, 5.3 Economics: Brokering, Bidding, and Auctioning, 6.0 Regulatory, and 7.0 General. Although the content of many publications spanned two or more of these sections, the desire to limit document length required that all publications be placed in the single most appropriate section. Publications are sorted according to author or publication resource.

Lankford, C.B. [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States)] [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States); McCalley, J.D. [Iowa State Univ., Ames, IA (United States)] [Iowa State Univ., Ames, IA (United States); Saini, N.K. [Entergy Services Corp., Metairie, LA (United States)] [Entergy Services Corp., Metairie, LA (United States)

1996-02-01T23:59:59.000Z

54

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network [OSTI]

penetration (Giebel 2005). Wind integration costs represent2005. Large Scale Integration of Wind Energy in the Europeanincreases in wind costs; Transmission and integration costs

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

55

Optoelectronics 514 Transmission Hologram Transmission Hologram  

E-Print Network [OSTI]

Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

Collins, Gary S.

56

Operating Costs Estimates Cost Indices  

E-Print Network [OSTI]

to update costs of specific equipment, raw material or labor or CAPEX and OPEX of entire plants Cost Indices

Boisvert, Jeff

57

Weighing the Costs and Benefits of State Renewables Portfolio Standards in the United States: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network [OSTI]

2005. Large Scale Integration of Wind Energy in the Europeanincreases in wind costs; Transmission and integration costs

Chen, Cliff

2009-01-01T23:59:59.000Z

58

IEEE TRANSACTIONS ON ENERGY CONVERSION, VOL. 19, NO. 1, MARCH 2004 151 Production Cost Analysis of Dispersed Generation  

E-Print Network [OSTI]

IEEE TRANSACTIONS ON ENERGY CONVERSION, VOL. 19, NO. 1, MARCH 2004 151 Production Cost Analysis the appli- cability and production cost analysis of dispersed generation (DG) resources in a transmission economics, production costing, transmission-constrained interconnected system. I. INTRODUCTION

Gross, George

59

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project  

SciTech Connect (OSTI)

This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands.

Woodford, D.

2011-02-01T23:59:59.000Z

60

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

SciTech Connect (OSTI)

This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

Woodford, D.

2011-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Evaluation of Production Cost Savings from Consolidation of Balancing Authorities in the US Western Interconnection under High Wind and Solar Penetration  

SciTech Connect (OSTI)

This paper introduces a comprehensive analysis to quantify the potential savings in production cost due to consolidation of 32 US western interconnection Balancing Authorities (BAs). Three simulation scenarios are developed: current Western Electricity Coordinating Council (WECC) BAs structure, full copper-sheet consolidation, and full consolidation with transmission congestion considered. The study uses WECC Transmission Expansion Planning Policy Committee (TEPPC) model that was developed for the year 2020. The model assumes 8% wind and 3% solar energy penetration as percentage of total WECC demand in 2020. Sensitivity analyses are carried out to assess the impact of transmission hurdle rates between WECC BAs on potential benefits. The study shows savings that ranges from $400 Million (2.4% of total one year production cost) to $600 Million (3.2%) per year in thermal units production cost due to consolidation can be achieved. The copper sheet consolidation scenario shows an extra savings of $240 Million (1.4%) per year.

Nguyen, Tony B.; Samaan, Nader A.; Jin, Chunlian

2014-12-24T23:59:59.000Z

62

Power Plant Cycling Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(say, a trip) and such factors are not fully captured in this dataset. 9. Older combined cycle units were a step change in lower operating costs due to cycling...

63

COMM-OPINION-ORDER, 76 FERC 61,347, Promoting Wholesale Competition Through Open-Access Non-discriminatory Transmission Services by Public Utilities, Docket No. RM95-8-000, Recovery of Stranded Costs by  

E-Print Network [OSTI]

COMM-OPINION-ORDER, 76 FERC ¶61,347, Promoting Wholesale Competition Through Open-Access Non Incorporated Promoting Wholesale Competition Through Open-Access Non-discriminatory Transmission Services Utilities, Docket No. RM94-7-001 [62,646] [¶61,347] Promoting Wholesale Competition Through Open-Access Non

Laughlin, Robert B.

64

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

SciTech Connect (OSTI)

Building transmission to reach renewable energy (RE) goals requires coordination among renewable developers, utilities and transmission owners, resource and transmission planners, state and federal regulators, and environmental organizations. The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this report we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33% of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Of the renewable resources in WREZ resource hubs, and under the assumptions described in this report, our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33% RE target across nearly all scenarios analyzed (38-65%). Solar energy is almost always the second largest source (14-41%). Solar exceeds wind by a small margin only when solar thermal energy is assumed to experience cost reductions relative to all other technologies. Biomass, geothermal, and hydropower are found to represent a smaller portion of the selected resources, largely due to the limited resource quantity of these resources identified within the WREZ-identified hubs (16-23% combined). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Uncertainties and policies that impact bus-bar costs are the most important to evaluate carefully, but factors that impact transmission costs and the relative market value of each renewable option can also be important. Under scenarios in which each load zone must meet 33% of its load with delivered renewable energy from the WREZ-identified resource hubs, the total transmission investment required to meet the 33% west-wide RE target is estimated at between $22 billion and $34 billion. Although a few of the new transmission lines are very long - over 800 miles - most are relatively short, with average transmission distances ranging from 230-315 miles, depending on the scenario. Needed transmission expenditure are found to decline to $17 billion if wide use of renewable energy credits is allowed; consideration of renewable resources outside of WREZ-identified hubs would further reduce this transmission cost estimate. Even with total transmission expenditures of $17-34 billion, however, these costs still represent just 10-19% of the total delivered cost of renewable energy.

Mills, Andrew; Phadke, Amol; Wiser, Ryan

2010-02-16T23:59:59.000Z

65

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

66

Merchant transmission investment  

E-Print Network [OSTI]

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

67

Cost Estimator  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a senior cost and schedule estimator who is responsible for preparing life-cycle cost and schedule estimates and analyses associated with the...

68

Operating Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

1997-03-28T23:59:59.000Z

69

Classification of the Visual Landscape for Transmission Planning1  

E-Print Network [OSTI]

. The third concept is that the specific design of transmission towers can result in a negative re- sponseClassification of the Visual Landscape for Transmission Planning1 Curtis Miller2/ , Nargis Jetha3 can be made of the visual change to the landscape due to the introduction of transmission facilities

Standiford, Richard B.

70

Nonlinear Free Vibrations of Coupled Spans of Overhead Transmission Lines  

E-Print Network [OSTI]

Nonlinear Free Vibrations of Coupled Spans of Overhead Transmission Lines Sjoerd W. Rienstra transmission lines is studied. It is shown that the natural vibration is the gravity mode, of which of the phenomenon of galloping, which is a high amplitude periodic oscillation of overhead transmission lines due

Rienstra, Sjoerd W.

71

Transmission Commercial Project Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

72

Cost Constrained Spectrum Sensing in Cognitive Radio Networks  

E-Print Network [OSTI]

networks considering its system level cost that accounts for the local processing cost of sensing (sample collection and energy calculation at each secondary user) as well as the transmission cost (forwarding energy for various factors that contribute to the cost incurred by spectrum sensing. In this paper, we study energy

Yener, Aylin

73

Policy Issues for Retail Beamed Power Transmission  

E-Print Network [OSTI]

solar electric power using retail delivery of beamed power. Recent advances in power beaming have made to enable widespread adoption of this clean and sustainable contribution to meeting energy needs. It is seen to micro-renewable energy resource exploitation since wired power transmission is only cost effective over

74

Loss-Resilient Proactive Data Transmission in Wireless Sensor Networks  

E-Print Network [OSTI]

environments. Moreover, sensor nodes are con- strained by energy, computation power and storage. Existing to the destination without loss. However, existing reliable transmission techniques either are too costly forecast, structural condition assessment) require reliable data communications, such that a target

Xu, Jianliang

75

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

from existing state renewable energy policy requirements,for renewable energy to different assumptions and policiesrenewable energy procurement, technology cost, transmission, and policy

Mills, Andrew D

2011-01-01T23:59:59.000Z

76

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network [OSTI]

from existing state renewable energy policy requirements,renewable energy procurement, technology cost, transmission, and policypolicies (including renewable development and energy

Mills, Andrew

2010-01-01T23:59:59.000Z

77

Automated manual transmission controller  

DOE Patents [OSTI]

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

78

Transmission Investment Timing and Sizing under Uncertainty Afzal Siddiqui  

E-Print Network [OSTI]

of a private investor holding a perpetual option to construct a transmission line. Using the real options-reverting process 1 Introduction Given the dependence of modern society on electricity, increased reliability than cost reduction. In deregulated electricity industries with functioning markets, transmission

Guillas, Serge

79

Market Concepts, Competing Technologies and Cost Challenges for Automotive and Stationary Applications  

E-Print Network [OSTI]

term) due to high fuel cell stack costs, but it would alsoto refuel; cost reductions in fuel cell stacks, auxiliaries,

Lipman, Todd; Sperling, Daniel

2003-01-01T23:59:59.000Z

80

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Electric Transmission Lines (Nebraska)  

Broader source: Energy.gov [DOE]

The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway crossings. This section contains general regulations...

82

Patterns of transmission investment  

E-Print Network [OSTI]

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

83

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

Authors James Bartridge Judy Grau Mark Hesters Don Kondoleon Chuck Najarian Contributing Authors Grace: Bartridge, James, Judy Grau, Mark Hesters, Don Kondoleon, Chuck Najarian. 2007 Strategic Transmission

84

Collaborative Transmission Technology Roadmap  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

techniques, and tools to analyze data from power quality recorders Size-up demand response opportunities Transmission level monitoring with PMUs is not sufficient and needs to...

85

EC Transmission Line Risk Identification and Analysis  

SciTech Connect (OSTI)

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

86

Contingent Transmission Rights in the Standard Market Design  

E-Print Network [OSTI]

(SMD), a market design in which congestion management is based on locational marginal pricing (LMP conditions such as availability and cost of energy at particular locations. In the transition to a single, transmission rights that provide an equivalent hedge against future locational congestion costs.1 The purpose

Baldick, Ross

87

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

· Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining% accuracy. ­ 2-5% of pre-production capital Types of Cost Estimates #12;3. Definitive ­ Based on definitive-even $ Production Level Fixed Cost Break-even $ Production Level Cost-Revenue Relationships · Capital Costs (or

Boisvert, Jeff

88

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

89

Transmission Enhancement Technology Report  

E-Print Network [OSTI]

of Existing Transmission 6 5. Potential New Equipment to Improve Transmission Capability 9 6. Potential New parties for the sites that should be studied as potential locations for new generation and to consult lignite and wind energy. " As per the requirements of the above-referenced Congressional direction

90

aplastic crisis due: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

a crisis due to doubling of fertilizer, grain, and fuel costs. New and better forage management practices 4 Aloimmunity against HLA class I antigens in patients with...

91

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

92

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408-Revenue Relationships · Capital Costs (or first cost or capital investment): ­ Expenditures made to acquire or develop capital assets ­ Three main classes of capital costs: 1. Depreciable Investment: · Investment allocated

Boisvert, Jeff

93

Comparison of reliability performance of group connected and conventional HVDC transmission systems  

SciTech Connect (OSTI)

A group connected HVDC transmission scheme is a variant of the unit connection where instead of a single generator, a group of generators are directly connected to the converter. Studies conducted in the past indicated that significant cost reduction can be achieved using this scheme. This is mainly due to the elimination of many components which results in considerable capital and operating cost savings to the utility. Concerns regarding the reliability performance of unit connected schemes were raised, however, there has not been a detailed reliability study conducted. This paper addresses the reliability evaluation aspect of a group connected scheme and compares the reliability performance of the group connected scheme with that of the conventional common collector system. Reliability models for both schemes were developed using a hypothetical system model based on the Nelson River system. Practical system component outage data was used to examine the reliability performance of both schemes.

Kuruganty, S. [Univ. of North Dakota, Grand Forks, ND (United States). Dept. of Electrical Engineering] [Univ. of North Dakota, Grand Forks, ND (United States). Dept. of Electrical Engineering

1995-10-01T23:59:59.000Z

94

Complex Dynamics of Blackouts in Power Transmission Systems B. A. Carreras and V. E. Lynch  

E-Print Network [OSTI]

the loss of load due to transmission lines reaching their load limits but no line outages. The second type to a dynamic equilibrium. Blackouts are modeled by overloads and outages of transmission lines determined

95

History of wireless power transmission  

SciTech Connect (OSTI)

The history of wireless power transmission at microwave frequencies is reviewed with emphasis upon the time period starting with the post World War II efforts to use the new microwave technology developed during the war. A nationally televised demonstration of a microwave powered helicopter at the Spencer Laboratory of the Raytheon Co., in 1964 was the result of these early efforts and broadly introduced the concept of wireless power transmission to scientific and engineering communities and to the public. Subsequent development efforts centered on improving the efficiency of the interconversion of d.c. and microwave power at the ends of the system to reach a demonstrated overall d.c. to d.c. system efficiency of 54% in 1974. The response to the requirements of applications such as the Solar Power Satellite and high altitude microwave powered aircraft have changed the direction of technology development and greatly expanded the technology base. Recent and current efforts are centered on examining the use of higher frequencies than the baseline 2.45 GHz, and in reducing the system costs at 2.45 GHz. 26 refs., 14 figs.

Brown, W.C. [Microwave Power Transmission Systems, Weston, MA (United States)] [Microwave Power Transmission Systems, Weston, MA (United States)

1996-12-31T23:59:59.000Z

96

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

97

Down hole transmission system  

DOE Patents [OSTI]

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

98

Transmission Services Bulletin  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Standard Time On the first Sunday in November Transmission Services sets clocks from Daylight Savings Time (PD) back to Standard Time (PS). At 02:00 the time becomes 01:00. In...

99

Transmission Grid Integration  

Broader source: Energy.gov [DOE]

The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

100

Designing electricity transmission auctions  

E-Print Network [OSTI]

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

National Electric Transmission Congestion Study Webinars | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

102

Flexible Transmission in the Smart Grid  

E-Print Network [OSTI]

Planning . 102 vi Transmission Line Maintenance Scheduling 103 Just-in-time Transmission 103 Flexible Transmission in the Smart Grid

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

103

Honda Transmission Technical Center  

High Performance Buildings Database

Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

104

Bulk Power Transmission Study  

E-Print Network [OSTI]

BULK POWER TRANSMISSION STUDY TOMMY JOH~ P. E. Manager of Resource Recovery Waste Management of North America, Inc. Houston, Texas Texans now have a choice. We can become more efficient and maintain our standard of living, or we can... continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled...

John, T.

105

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

106

E-Print Network 3.0 - average system cost Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Berkeley National Laboratory, High Redshift Supernova Search Collection: Physics ; Power Transmission, Distribution and Plants 3 Project Cost Management King Fahd University...

107

Estimating Specialty Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

1997-03-28T23:59:59.000Z

108

Final Project Due: May 18, 2010  

E-Print Network [OSTI]

1 Geos 206 Final Project Due: May 18, 2010 Save the trees, and the music stands: An Energy: Monthly totals Total Electricity in kWh Average kWh per day Cost $.11/kWh Emissions .41 kg/kWh (unit in kg electricity bill, cost and emissions of the Bernhard/Chapin complex. 4 Figure 3: This graph provides a monthly

Aalberts, Daniel P.

109

2014 ALCC Proposals Due  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ALCC Proposals Due February 3, 2014 2014 DOE ALCC Proposals Due February 3 December 23, 2013 by Francesca Verdier (0 Comments) DOE's 2014 call for its ASCR Leadership Computing...

110

Hybrid Transmission Corridor study  

SciTech Connect (OSTI)

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

111

Electricity transmission: an overview of the current debate  

E-Print Network [OSTI]

is called on to perform an increasing role in supporting an effectively competitive power market. Both cross-border and internal transmission management demands raise a whole set of highly complex issues of both academic interest and policy relevance... transmission are very high, and the costs of somewhat over-building the network are rather modest, those charged with ensuring reliable supplies are likely to err on the side of too much rather than too little spare capacity. This further depresses...

Brunekreeft, Gert; Neuhoff, Karsten; Newbery, David

2006-03-14T23:59:59.000Z

112

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

113

Low Frequency Transmission Final Project Report  

E-Print Network [OSTI]

to HVDC transmission and conventional AC transmission in different configurations. The issue is quite

114

Employee Replacement Costs  

E-Print Network [OSTI]

Employee Replacement Costs Arindrajit Dube, Eric Freeman andproperties of employee replacement costs, using a panel2008. We establish that replacement costs are sub- stantial

Dube, Arindrajit; Freeman, Eric; Reich, Michael

2010-01-01T23:59:59.000Z

115

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

publications.html PG&E. 2007a. WECC Regional PlanningCalifornia Electric: WECC Regional Planning Project,Presentation January 23,2008 WECC Regional Planning Review

Mills, Andrew D.

2009-01-01T23:59:59.000Z

116

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network [OSTI]

the full capacity of the wind power plant at all times. Theto wind projects than to conventional power plants. Thecoal plants) can be leveraged to efficiently move wind power

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

117

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

focused approach, a new wind generator located near theallow the output of the wind generator to displace the power

Mills, Andrew D.

2009-01-01T23:59:59.000Z

118

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

turbines and compressed air energy storage for supplementalresources and compressed air energy storage (CAES). Energy

Mills, Andrew D.

2009-01-01T23:59:59.000Z

119

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

pdf/0554(2008).pdf European Wind Energy Association (EWEA).Large Scale Integration of Wind Energy in the European PowerPrepared by the European Wind Energy Association. http://

Mills, Andrew D.

2009-01-01T23:59:59.000Z

120

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Assumptions to the Annual Energy Outlook 2008. Washington,by the EIA in its Annual Energy Outlook (AEO), as well as tocost, which in the Annual Energy Outlook 2008 was assumed to

Mills, Andrew D.

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

and areas of high wind potential, using (wherever possible)Wind by 2030 Calss 4-7 Wind Potential (GW) Region 1 Region 2with large amounts of potential wind energy development, but

Mills, Andrew D.

2009-01-01T23:59:59.000Z

122

Borehole data transmission apparatus  

DOE Patents [OSTI]

A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

1993-01-01T23:59:59.000Z

123

Autonomous data transmission apparatus  

DOE Patents [OSTI]

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

124

Autonomous data transmission apparatus  

DOE Patents [OSTI]

A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

Kotlyar, O.M.

1997-03-25T23:59:59.000Z

125

Omega Transmission Lines  

E-Print Network [OSTI]

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

126

Borehole data transmission apparatus  

DOE Patents [OSTI]

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

127

WREF 2012: THE PAST AND FUTURE COST OF WIND ENERGY  

SciTech Connect (OSTI)

The future of wind power will depend on the ability of the industry to continue to achieve cost reductions. To better understand the potential for cost reductions, this report provides a review of historical costs, evaluates near-term market trends, and summarizes the range of projected costs. It also notes potential sources of future cost reductions. Our findings indicate that steady cost reductions were interrupted between 2004 and 2010, but falling turbine prices and improved turbine performance are expected to drive a historically low LCOE for current installations. In addition, the majority of studies indicate continued cost reductions on the order of 20%-30% through 2030. Moreover, useful cost projections are likely to benefit from stronger consideration of the interactions between capital cost and performance as well as trends in the quality of the wind resource where projects are located, transmission, grid integration, and other cost variables.

NREL,; Wiser, Ryan; Lantz, Eric; Hand, Maureen

2012-03-26T23:59:59.000Z

128

Keeping the Lights on While Cutting Costs.  

SciTech Connect (OSTI)

In 1992, the Bonneville Power Administration spent $361 million in capital on a system to transmit electricity. By 1998, it was spending about one-third that amount: $123 million. In 1992, BPA`s expenses for managing, operating and maintaining the transmission system ran $160 million. By 1998, BPA had cut expenses to $128 million. Maintenance costs alone were cut 28%. In 1992, management of the grid was split into six organizations. Today, there is one. About 2,900 people worked for transmission in October 1992. By February 1998, the Transmission Business Line (TBL) employed 1,855. Transmission in 1992 for the most part meant new towers, lines and substations. Today it means computers, digital communications and electronic controls.

United States. Bonneville Power Administration.

1998-08-01T23:59:59.000Z

129

Abstract--The increase in use of power electronics in transmission and distribution applications is the driving  

E-Print Network [OSTI]

is the driving force for development of high power devices. Utility applications like FACTS and HVDC require cost and compared for SiC and Si devices. These loss models are integrated with an HVDC transmission system to study of the systems. High Voltage DC (HVDC) transmission and Flexible AC Transmission Systems (FACTS) are the widely

Tolbert, Leon M.

130

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

131

Patterns of Transmission Investment  

E-Print Network [OSTI]

long term performance contracts with a developer of an HVDC transmission link to expand “interconnection” capacity between TSOs with no or limited interconnections and with large sustained differences in prices. Merchant investments supported... truly separate AC networks. For example, by building HVDC inter-connectors between two separate networks, opportunities to increase trades of power from high price to low priced areas can be exploited. The HVDC link between the England and France...

Joskow, Paul

2006-03-14T23:59:59.000Z

132

DOE Transmission Workshop  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Deliciouscritical_materials_workshop_presentations.pdf MoreProgramofContract at itsSelections for ReducingTransmission

133

Geothermal Resources and Transmission Planning  

Broader source: Energy.gov [DOE]

This project addresses transmission-related barriers to utility-scale deployment of geothermal electric generation technologies.

134

Boardman to Hemingway Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

135

Transmission Issues Policy Steering Committee  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business Practices CommitteesTeams Joint Operating Committee Transmission Issues Policy Steering Committee Customer Training Interconnection Notices Rates Standards of...

136

A Comprehensive Approach for Computation and Implementation of Efficient Electricity Transmission Network Charges  

E-Print Network [OSTI]

This paper presents a comprehensive design of electricity transmission charges that are meant to recover regulated network costs. In addition, these charges must be able to meet a set of inter-related objectives. Most ...

Pérez-Arriaga, Ignacio J.

137

Analysis of A Loss-Resilient Proactive Data Transmission Protocol in Wireless Sensor Networks  

E-Print Network [OSTI]

nodes are constrained by energy, computation power and storage. Existing reliable transmission, limited energy, and constrained computation and storage capacity. To optimize the performance without loss. However, existing reliable trans- mission techniques either are too costly for resource

Lee, Dongwon

138

Managing County Employee Health Care Costs The Problem  

E-Print Network [OSTI]

Managing County Employee Health Care Costs The Problem If food costs increased at same rate as health care, one dozen eggs would cost $80.20! 87.5% of health-care claims are due to employees cholesterol, and inactivity. Costs include unnecessary use of health-care services: 25% of doctor visits

139

The unit cost factors and calculation methods for decommissioning - Cost estimation of nuclear research facilities  

SciTech Connect (OSTI)

Available in abstract form only. Full text of publication follows: The uncertainties of decommissioning costs increase high due to several conditions. Decommissioning cost estimation depends on the complexity of nuclear installations, its site-specific physical and radiological inventories. Therefore, the decommissioning costs of nuclear research facilities must be estimated in accordance with the detailed sub-tasks and resources by the tasks of decommissioning activities. By selecting the classified activities and resources, costs are calculated by the items and then the total costs of all decommissioning activities are reshuffled to match with its usage and objectives. And the decommissioning cost of nuclear research facilities is calculated by applying a unit cost factor method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning costs of nuclear research facilities are composed of labor cost, equipment and materials cost. Of these three categorical costs, the calculation of labor costs are very important because decommissioning activities mainly depend on labor force. Labor costs in decommissioning activities are calculated on the basis of working time consumed in decommissioning objects and works. The working times are figured out of unit cost factors and work difficulty factors. Finally, labor costs are figured out by using these factors as parameters of calculation. The accuracy of decommissioning cost estimation results is much higher compared to the real decommissioning works. (authors)

Kwan-Seong Jeong; Dong-Gyu Lee; Chong-Hun Jung; Kune-Woo Lee [Korea Atomic Energy Research Institute, Deokjin-dong 150, Yuseong-gu, Daejeon 305-353 (Korea, Republic of)

2007-07-01T23:59:59.000Z

140

Automated manual transmission clutch controller  

DOE Patents [OSTI]

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

1999-11-30T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Cost Model and Cost Estimating Software  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

1997-03-28T23:59:59.000Z

142

Combining LT codes and XOR network coding for reliable and energy efficient transmissions in  

E-Print Network [OSTI]

Combining LT codes and XOR network coding for reliable and energy efficient transmissions projects. Recent technologies offer low-cost and low-power chips that can be deployed for monitoring reliability at the price of an increase in energy expenditure for redundant transmissions. Thus

Jaffrès-Runser, Katia

143

Transmission - Contact Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler TinaContact-Information-Transmission Sign In About |

144

Transmission Capacity Forum  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler TinaContact-Information-Transmission Sign In About

145

Transmission Contact Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler TinaContact-Information-Transmission Sign In

146

Transmission Developers Inc.  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for' % ~ Transmission

147

Transmission and Storage Operations  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for' %Transmission and

148

Electricity Transmission, A Primer  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatementNOTElectricity Transmission System

149

Transmission Right Of Way  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layered NbS2Topo II: AnTraining andfordefault SignTransmissionAbout

150

Transmission SEAB Presentation  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of EnergyProgram2-26 Date: March 2, 2012Department ofTransmissionOvercoming

151

Costing of Joining Methods -Arc Welding Costs  

E-Print Network [OSTI]

Costing of Joining Methods - Arc Welding Costs ver. 1 ME 6222: Manufacturing Processes and Systems.S. Colton © GIT 2009 5 #12;LaborLabor Di t ti f ldi· Direct time of welding ­ time to produce a length of weld ­ labor rate ­ multiplication gives labor cost per length · Set-up time, etc. · Personal time

Colton, Jonathan S.

152

Cost-Effective Cable Insulation: Nanoclay Reinforced Ethylene-Propylene-Rubber for Low-Cost HVDC Cabling  

SciTech Connect (OSTI)

GENI Project: GE is developing new, low-cost insulation for high-voltage direct current (HVDC) electricity transmission cables. The current material used to insulate HVDC transmission cables is very expensive and can account for as much as 1/3 of the total cost of a high-voltage transmission system. GE is embedding nanomaterials into specialty rubber to create its insulation. Not only are these materials less expensive than those used in conventional HVDC insulation, but also they will help suppress excess charge accumulation. The excess charge left behind on a cable poses a major challenge for high-voltage insulation—if it’s not kept to a low level, it could ultimately lead the insulation to fail. GE’s low-cost insulation is compatible with existing U.S. cable manufacturing processes, further enhancing its cost effectiveness.

None

2012-02-24T23:59:59.000Z

153

Abstract --Under a context of transmission open access, a methodology to define a common transmission trunk system  

E-Print Network [OSTI]

Terms--Transmission systems, Transmission pricing, Cooperative games, Shapley value, Transmission open

Catholic University of Chile (Universidad Católica de Chile)

154

Colorado Electrical Transmission Grid  

SciTech Connect (OSTI)

Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Xcel Energy Publication Date: 2012 Title: Colorado XcelEnergy NonXcel Transmission Network Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains transmission network of Colorado Spatial Domain: Extent: Top: 4540689.017558 m Left: 160606.141934 m Right: 758715.946645 m Bottom: 4098910.893397m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shapefile

Zehner, Richard E.

2012-02-01T23:59:59.000Z

155

2009 Cost Estimates of Establishing and  

E-Print Network [OSTI]

2009 Cost Estimates of Establishing and Producing Gala Apples in Washington WASHINGTON STATE include estimating 1) the costs of the equipment, materials, supplies, and labor required to establish for any particular orchard operation due to case-specific: · Capital, labor, and natural resources · Crop

Collins, Gary S.

156

Activity Based Costing  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

1997-03-28T23:59:59.000Z

157

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION  

Broader source: Energy.gov [DOE]

The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

158

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating...

159

Can Solar PV Rebates Be Funded with Utility Cost Savings?  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Costs 10 Years into Future is Hard Determining Actual Demand Reduction due to Solar at MonthlyAnnual Peaks Requires Long Term Data Collection Wholesale Net...

160

Contracting with reading costs and renegotiation costs  

E-Print Network [OSTI]

OF CALIFORNIA, SAN DIEGO Contracting with Reading Costs andrents, and the competitive contracting process. Journal ofReiche. Foundation of incomplete contracting in a model of

Brennan, James R.

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Systems Engineering Cost Estimation  

E-Print Network [OSTI]

on project, human capital impact. 7 How to estimate Cost? Difficult to know what we are building early on1 Systems Engineering Lecture 3 Cost Estimation Dr. Joanna Bryson Dr. Leon Watts University of Bath: Contrast approaches for estimating software project cost, and identify the main sources of cost

Bryson, Joanna J.

162

Life Cycle Cost Estimate  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

1997-03-28T23:59:59.000Z

163

Cost Estimation Package  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

1997-03-28T23:59:59.000Z

164

Aerogel commercialization: Technology, markets and costs  

SciTech Connect (OSTI)

Commercialization of aerogels has been slow due to several factors including cost and manufacturability issues. The technology itself is well enough developed as a result of work over the past decade by an international-community of researchers. Several extensive substantial markets appear to exist for aerogels as thermal and sound insulators, if production costs can keep prices in line with competing established materials. The authors discuss here the elements which they have identified as key cost drivers, and they give a prognosis for the evolution of the technology leading to reduced cost aerogel production.

Carlson, G.; Lewis, D.; McKinley, K.; Richardson, J.; Tillotson, T.

1994-10-07T23:59:59.000Z

165

Method and apparatus for executing a shift in a hybrid transmission  

SciTech Connect (OSTI)

A method for executing a transmission shift in a hybrid transmission including first and second electric machines includes executing a shift-through-neutral sequence from an initial transmission state to a target transmission state including executing an intermediate shift to neutral. Upon detecting a change in an output torque request while executing the shift-through-neutral sequence, possible recovery shift paths are identified. Available ones of the possible recovery shift paths are identified and a shift cost for each said available recovery shift path is evaluated. The available recovery shift path having a minimum shift cost is selected as a preferred recovery shift path and is executed to achieve a non-neutral transmission state.

Gupta, Pinaki; Kaminsky, Lawrence A; Demirovic, Besim

2013-09-03T23:59:59.000Z

166

OOTW COST TOOLS  

SciTech Connect (OSTI)

This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

HARTLEY, D.S.III; PACKARD, S.L.

1998-09-01T23:59:59.000Z

167

IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 24, NO. 2, APRIL 2009 961 Estimates of Comparative Costs for  

E-Print Network [OSTI]

assets. I. INTRODUCTION I NCREASING real-estate costs and continued opposition to new transmission lines. MODEL OF AC TRANSMISSION LINES A. Parameters Specifying Electrical Model and Characteristics In this section, we review the electrical model and charac- teristics of AC transmission lines, focusing

Baldick, Ross

168

Direct current power transmission systems  

SciTech Connect (OSTI)

This book represents text on HVDC transmission available. It deals with the various aspects of the state of the art in HVDC transmission technology. This book presents many aspects of interactions of AC/DC systems. Modeling and analysis of DC systems are also discussed in detail.

Padiyar, K.R.

1991-01-01T23:59:59.000Z

169

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

Elec Del Cali: Del Investment Cost Delivery Cost OperatingCost Feedstock Cost Investment Cost Delivery Cost Operatingcosts Annualized investment cost, 1000$/yr Total annualized

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

170

Key-shift transmission  

SciTech Connect (OSTI)

A key-shift transmission is described, characterized by the speed-change shaft being divided into a pair of trough-shaped shaft halves each having an arched inner surface which defines a part of a cylindrical bore extending axially through the speed-change shaft thereby the shaft being formed into a hollow shaft, and by each of the shaft halves including a pair of flattened end surfaces which extend axially of each shaft half at both sides of the inner surface, one of the end surfaces having thereon an axially elongated projection and the other of the end surfaces having herein an axially elongated recess of a depth smaller than the height of the projection. The pair of shaft halves are engaged to each other co-rotatably by fitting the projections of the respective shaft halves into the recesses of the respective shaft halves so as to form in an outer surface of the speed-change shaft a pair of elongated axial grooves which are located radially outwardly of the elongated projections of the respective shaft halves and between the flattened end surfaces of the respective shaft halves. A pair of the shift keys are disposed within the pair of elongated axial grooves.

Nemoto, S.

1989-03-07T23:59:59.000Z

171

The advantage of multiple cultural parents in the cultural transmission of stories Kimmo Eriksson1,2  

E-Print Network [OSTI]

The advantage of multiple cultural parents in the cultural transmission of stories Kimmo Eriksson1, Sweden (e-mail: kimmo.eriksson@mdh.se). *Title Page #12;The advantage of multiple cultural parents transmission has shown that the rate at5 which culture is lost (due to imperfect transmission) will crucially

172

Abstract--This paper addresses the problem of interaction between short run and long run locational signals and the coordination between generation investments and lumpy transmission  

E-Print Network [OSTI]

. The short run locational signals we evaluate are sent by nodal pricing and the long run ones are sent-known marginal pricing to expand both generation and transmission capacity (Crew et al., 1995; Stoft, 2006). One the marginal transmission capacity cost with marginal congestion cost. Nodal pricing as market-based pricing

Paris-Sud XI, Université de

173

Productivity and Efficiency of US Gas Transmission Companies: A European Regulatory Perspective  

E-Print Network [OSTI]

the long- standing regime of cost-plus regulation was complemented by increasing pipe- to-pipe competition, most European countries moved towards incentive regulation complemented by market integration. We study the impact of US regulatory reform using a... by complementing cost- of-service regulation with institutions fostering competition and market integration (O'Neill, 2005), European regulators treat gas transmission as incentive-regulated franchise monopolies (Makholm, 2007). Both, traditional US cost...

Jamasb, Tooraj; Pollitt, Michael G.; Triebs, T

174

Conductive Channel for Energy Transmission  

SciTech Connect (OSTI)

For many years the attempts to create conductive channels of big length were taken in order to study the upper atmosphere and to settle special tasks, related to energy transmission. There upon the program of creation of 'Impulsar' represents a great interest, as this program in a combination with high-voltage high repetition rate electrical source can be useful to solve the above mentioned problems (N. Tesla ideas for the days of high power lasers). The principle of conductive channel production can be shortly described as follows. The 'Impulsar' - laser jet engine vehicle - propulsion take place under the influence of powerful high repetition rate pulse-periodic laser radiation. In the experiments the CO{sub 2}-laser and solid state Nd:YAG laser systems had been used. Active impulse appears thanks to air breakdown (<30 km) or to the breakdown of ablated material on the board (>30 km), placed in the vicinity of the focusing mirror-acceptor of the breakdown waves. With each pulse of powerful laser the device rises up, leaving a bright and dense trace of products with high degree of ionization and metallization by conductive nano-particles due to ablation. Conductive dust plasma properties investigation in our experiments was produced by two very effective approaches: high power laser controlled ablation and by explosion of wire. Experimental and theoretical results of conductive canal modeling will be presented. The estimations show that with already experimentally demonstrated figures of specific thrust impulse the lower layers of the Ionosphere can be reached in several ten seconds that is enough to keep the high level of channel conductivity and stability with the help of high repetition rate high voltage generator. Some possible applications for new technology are highlighted.

Apollonov, Victor V. [A.M. Prokhorov General Physics Institute, Vavilov Str. 38, Moscow, 119991 (Russian Federation)

2011-11-10T23:59:59.000Z

175

Energy Transmission and Infrastructure  

SciTech Connect (OSTI)

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

176

AC and DC power transmission  

SciTech Connect (OSTI)

The technical and economic assessment of AC and DC transmission systems; long distance transmission, cable transmission, system inter-connection, voltage support, reactive compensation, stabilisation of systems; parallel operation of DC links with AC systems; comparison between alternatives for particular schemes. Design and application equipment: design, testing and application of equipment for HVDC, series and shunt static compensated AC schemes, including associated controls. Installations: overall design of stations and conductor arrangements for HVDC, series and shunt static AC schemes including insulation co-ordination. System analysis and modelling.

Not Available

1985-01-01T23:59:59.000Z

177

Electrical transmission line diametrical retainer  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

178

Midwest Transmission Workshop I Summary  

SciTech Connect (OSTI)

OAK-B135 The meeting was opened with a review of the purposes of the workshop: (1) Present and discuss key studies and assessments of transmission upgrades, additions and related issues for the upper Midwest, including work that addresses the full range of views on these topics; (2) Understand the various transmission issues in the upper Midwest and discuss options for addressing the issues; and (3) Identify the decision makers and entities that need to play an active role if transmission issues are to be resolved, and agree on next steps for engaging these individuals and organizations through education, outreach, and information dissemination.

Kevin Bryan

2001-05-01T23:59:59.000Z

179

GTO thyristor applications for HVDC transmission systems  

SciTech Connect (OSTI)

The development of a large capacity gate turn off thyristor (GTO) has made it possible to manufacture self-commutated convertors employing GTO for power applications. In this paper, conceptual designs for convertor station equipment for a HVDC transmission system employing current as well as voltage source type GTO convertors (simply referred to as VSTGC and CSTGC) are presented. The study result indicates that the VSTGC is preferable over the CSTGC. Also presented in this paper is a preliminary economic comparison between two HVDC system alternatives for applying power to a weak ac system, one employing a self-commutated GTO convertor and the other employing a combination of line-commutated convertor and a synchronous condenser. The result indicates that the two HVDC convertor station alternatives cost about the same.

Yamada, H.; Sampei, M. (Electric Power Development Co. Ltd., Tokyo (Japan)); Kashiwazaki, H.; Tanaka, C. (Hitachi Ltd., Tokyo (Japan)); Takahashi, T.; Horivchi, T. (Toshiba Corp., Tokyo (JP))

1990-07-01T23:59:59.000Z

180

Direct/Indirect Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

1997-03-28T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Environmental Cost Analysis  

E-Print Network [OSTI]

Environmental Cost Analysis David Edge Texas Natural Resource Conservation Commission 131 ESL-IE-00-04-21 Proceedings from the Twenty-second National Industrial Energy Technology Conference, Houston, TX, April 5-6, 2000 Tuas Natural... Resource Conservation CorDDliuion Environmental Cost Analysis Presented By David Edge Determine the Costs c> Input co Output c> Hidden c> Capital (non recurring) Envirormenlal Cost Analy.;is "There has to be a measurable result...

Edge, D.

182

Shaft generator transmissions  

SciTech Connect (OSTI)

Economical on-board power can be generated from two-stroke, low-speed engines by installing a multistage hollow-shaft gearbox on the propeller intermediate shaft to drive the generator. Gearbox manufacturer Asug, based in Dessau, Germany, has designed units specifically for this purpose. The Asug shaft generator drive concept for generator drives at the front end of the engine is designed to reduce installation costs and uses an integrated engine-gearbox foundation. The complete propulsion system, consisting of the diesel engine, gear with coupling and generator, can be completely or partially preassembled outside the ship`s engine room to reduce onboard assembly time. A separate foundation for this arrangement is not necessary. The company offers a full range of gearboxes to generate power from 500 kW up to 5000 kW. Gearboxes driven from the forward engine end often incorporate an additional gear stage to gain energy from an exhaust turbine. This arrangement feeds part of the exhaust energy back into the system to increase efficiency. Latest installations of Asug shaft generator gears are in container ships and cargo/container ships built in Turkey and China.

NONE

1995-11-01T23:59:59.000Z

183

Power Plant Cycling Costs  

SciTech Connect (OSTI)

This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

2012-07-01T23:59:59.000Z

184

The transmission system as main actor in electricity market development in Romania  

SciTech Connect (OSTI)

At the beginning of 1998, Romanian Electricity Authority (RENEL) was a fully integrated generation, transmission and distribution company, which managed all aspects of planning, design, and operation of Romania' s electricity sector. This form of vertically integrated organization has enabled to develop the high voltage transmission system in order to transfer electricity from the large power plants on indigenous coal (lignite) to the deficit electricity areas. An analysis based on specific characteristics of Romanian Transmission System allows the identification of a suitable model cost for transmission services evaluation. The transmission electricity tariff as a market tool has become a necessity for the heterogeneous Romanian power systems from the repartition of the generation against the demand location point of view. The experience of the power system development planner shows that the most suitable model for the transmission electricity system cost assessment is the rated zones in order to reflect the geographical imbalance of generation and demand and the ability of the transmission system to accommodate this imbalance. Setting principles for the cost evaluation has to be sustained by the service evaluation on the grid nodes at the interface between transmission system and distribution system. This cost evaluation under the form of incentives for new producers has to be reconsidered year by year taking into account the evolution in time both production side and demand side. The incentives have to be addressed directly to the producers and must be strong enough to provide an efficient reliable operation of the whole power system. Transmission planners have to develop new approaches to deal with the uncertainties of the market; a combination of market forces and regulation seems to ensure the best way for the quality and security of the power system beside of the efficiency of all actors from the electricity market.

Petrescu, A.M.; Mihailescu, F.

1998-07-01T23:59:59.000Z

185

Abstract--Under the need for anticipatory efficient investment in transmission, several problems arise at the regulation and  

E-Print Network [OSTI]

an efficient (least-cost) interconnected system. According to marginal theory, if Locational Marginal Prices (LMPs) work, then transmission investment is ensured by a company that: (i) takes the price

Catholic University of Chile (Universidad Católica de Chile)

186

Video transmission over wireless networks  

E-Print Network [OSTI]

Compressed video bitstream transmissions over wireless networks are addressed in this work. We first consider error control and power allocation for transmitting wireless video over CDMA networks in conjunction with multiuser detection. We map a...

Zhao, Shengjie

2005-08-29T23:59:59.000Z

187

EIS-0231: Navajo Transmission Project  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned...

188

Cost Estimating Handbook for Environmental Restoration  

SciTech Connect (OSTI)

Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

NONE

1990-09-01T23:59:59.000Z

189

WINDExchange Offshore Wind Webinar: Transmission Planning and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind WINDExchange Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind...

190

2006 National Electric Transmission Congestion Study Federal...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

191

National Electric Transmission Congestion Study | Department...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Study National Electric Transmission Congestion Study National Electric Transmission Congestion Study Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C....

192

2009 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

193

2006 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

194

National Electric Transmission Congestion Study Workshops | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study Workshops National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops to receive input...

195

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

196

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2013 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

197

Natural Gas Transmission and Distribution Module This  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2012 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

198

DEPARTMENT OF ENERGY National Electric Transmission Congestion...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Report Docket No. 2007-OE-01, Mid-Atlantic Area National Interest Electric Transmission Corridor; Docket No. 2007-0E-02, Southwest Area...

199

Directly correlated transmission electron microscopy and atom...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directly correlated transmission electron microscopy and atom probe tomography of grain boundary oxidation in a Ni-Al binary Directly correlated transmission electron microscopy...

200

Market Equilibrium with Transaction Costs  

E-Print Network [OSTI]

Identical products being sold at different prices in different locations is a common phenomenon. Price differences might occur due to various reasons such as shipping costs, trade restrictions and price discrimination. We give a way to model such scenarios by supplementing the classical Fisher model of a market by introducing {\\em transaction costs}. For every buyer $i$ and every good $j$, there is a transaction cost of $\\cij$; if the price of good $j$ is $p_j$, then the cost to the buyer $i$ {\\em per unit} of $j$ is $p_j + \\cij$. This allows the same good to be sold at different (effective) prices to different buyers. We study questions regarding existence, uniqueness and computability of equilibrium in such a model. Our results can be summarized as such: The convex program of \\cite{Dev09} can be generalized to prove existence and uniqueness of equilibrium. We also provide a combinatorial algorithm that computes $\\epsilon$-approximate equilibrium prices and allocations in $O(\\frac{1}{\\epsilon}(n+\\log{m})mn\\l...

Chakraborty, Sourav; Karande, Chinmay

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Cost effective lighting  

SciTech Connect (OSTI)

Long-life replacement lamps for the incandescent lamp have been evaluated with regard to their cost effectiveness. The replacements include the use of energy buttons that extend lamp life as well as an adaptive fluorescent circline lamp that will fit into existing incandescent lamp sockets. The initial, operating, and replacement costs for one million lumen-hours are determined for each lamp system. We find the most important lighting cost component is the operating cost. Using lamps that are less efficient or devices that cause lamps to operate less efficiently are not cost-effective. The adaptive fluorescent circline lamp, even at an initial cost of $15.00, is the most cost effective source of illumination compared to the incandescent lamp and lamp systems examined. 3 refs., 6 tabs.

Morse, O.; Verderber, R.

1987-07-01T23:59:59.000Z

202

Abstract-Electricity transmission planning does not have a common solution worldwide, with most countries trusting on  

E-Print Network [OSTI]

Abstract- Electricity transmission planning does not have a common solution worldwide, with most-growing conditions of the Chilean energy market, driven by private agents, meant the need to introduce changes issue in the restructuring of the electricity market all over the world. Transmission systems costs

Catholic University of Chile (Universidad Católica de Chile)

203

Bayesian Image Reconstruction for Transmission Tomography Using Mixture Model Priors and Deterministic Annealing  

E-Print Network [OSTI]

degradations in emission computed tomography (ECT) for both PET and SPECT. To improve quantitative accuracy transmission projection data. However, the transmission projection data is itself usually very noisy due to the necessities of a short-time acquisition and limited count rate . The low-count data makes the reconstruction

204

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network [OSTI]

Costs Annualized Investment Cost, 1000$/yr Total AnnualizedH2 Fueling Stations Investment Cost Cost ($/yr) OperatingH2 Fueling Stations Investment Cost Cost ($/kg) Operating

Weinert, Jonathan X.; Shaojun, Liu; Ogden, J; Jianxin, Ma

2006-01-01T23:59:59.000Z

205

Renewable portfolio standards, Greenhouse gas reduction, and Long-Line transmission investments in the WECC  

SciTech Connect (OSTI)

New, long-distance transmission lines to remote areas with concentrations of high-quality renewable resources can help western states meet the challenges of increasing renewable energy procurement and reducing greenhouse gas emissions more cost-effectively than reliance on local resources alone. The approach applied here to the Western Electricity Coordinating Council is useful for an initial determination of the net benefits of long-line transmission between regions with heterogeneous resource quality. (author)

Olson, Arne; Orans, Ren; Allen, Doug; Moore, Jack; Woo, C.K.

2009-11-15T23:59:59.000Z

206

July 2, 2007 1 Optimal Transmission Switching  

E-Print Network [OSTI]

d to node n. zk: binary variable indicating whether transmission line k is removed from the system limit on number of open transmission lines Manuscript received July 2, 2007. This work was supported-mail: ferris@cs.wisc.edu). Sets : Set of all transmission lines L: Set of open transmission lines in solution

Mangasarian, Olvi L.

207

Cost analysis guidelines  

SciTech Connect (OSTI)

The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

Strait, R.S.

1996-01-10T23:59:59.000Z

208

Pension costs and liabilities  

E-Print Network [OSTI]

be to charge the cost over the current and subsequent years on the assumption that the cost, even though measured by past services, is incurred in contemplation of present and future 1 services. 1'he development of accounting thought concerning retire...? present liabilities are under- stated and owner's equity is overstated by a corresponding amount. It seems, however, that charging retained earnings with the past service cost does not, represent the true picture. Pension payments based solely on past...

Courtney, Harley Macon

1961-01-01T23:59:59.000Z

209

LMFBR fuel component costs  

SciTech Connect (OSTI)

A significant portion of the cost of fabricating LMFBR fuels is in the non-fuel components such as fuel pin cladding, fuel assembly ducts and end fittings. The contribution of these to fuel fabrication costs, based on FFTF experience and extrapolated to large LMFBR fuel loadings, is discussed. The extrapolation considers the expected effects of LMFBR development programs in progress on non-fuel component costs.

Epperson, E.M.; Borisch, R.R.; Rice, L.H.

1981-10-29T23:59:59.000Z

210

Hydrogen and Infrastructure Costs  

Broader source: Energy.gov (indexed) [DOE]

FUEL CELL TECHNOLOGIES PROGRAM Hydrogen and Infrastructure Costs Hydrogen Infrastructure Market Readiness Workshop Washington D.C. February 17, 2011 Fred Joseck U.S. Department of...

211

Target Cost Management Strategy  

E-Print Network [OSTI]

Target cost management (TCM) is an innovation of Japanese management accounting system and by common sense has been considered with great interest by practitioners. Nowadays, TCM related

Okano, Hiroshi

1996-01-01T23:59:59.000Z

212

''When Cost Measures Contradict''  

SciTech Connect (OSTI)

When regulators put forward new economic or regulatory policies, there is a need to compare the costs and benefits of these new policies to existing policies and other alternatives to determine which policy is most cost-effective. For command and control policies, it is quite difficult to compute costs, but for more market-based policies, economists have had a great deal of success employing general equilibrium models to assess a policy's costs. Not all cost measures, however, arrive at the same ranking. Furthermore, cost measures can produce contradictory results for a specific policy. These problems make it difficult for a policy-maker to determine the best policy. For a cost measures to be of value, one would like to be confident of two things. First one wants to be sure whether the policy is a winner or loser. Second, one wants to be confident that a measure produces the correct policy ranking. That is, one wants to have confidence in a policy measure's ability to correctly rank policies from most beneficial to most harmful. This paper analyzes empirically these two properties of different costs measures as they pertain to assessing the costs of the carbon abatement policies, especially the Kyoto Protocol, under alternative assumptions about implementation.

Montgomery, W. D.; Smith, A. E.; Biggar, S. L.; Bernstein, P. M.

2003-05-09T23:59:59.000Z

213

Avoidable waste management costs  

SciTech Connect (OSTI)

This report describes the activity based costing method used to acquire variable (volume dependent or avoidable) waste management cost data for routine operations at Department of Energy (DOE) facilities. Waste volumes from environmental restoration, facility stabilization activities, and legacy waste were specifically excluded from this effort. A core team consisting of Idaho National Engineering Laboratory, Los Alamos National Laboratory, Rocky Flats Environmental Technology Site, and Oak Ridge Reservation developed and piloted the methodology, which can be used to determine avoidable waste management costs. The method developed to gather information was based on activity based costing, which is a common industrial engineering technique. Sites submitted separate flow diagrams that showed the progression of work from activity to activity for each waste type or treatability group. Each activity on a flow diagram was described in a narrative, which detailed the scope of the activity. Labor and material costs based on a unit quantity of waste being processed were then summed to generate a total cost for that flow diagram. Cross-complex values were calculated by determining a weighted average for each waste type or treatability group based on the volume generated. This study will provide DOE and contractors with a better understanding of waste management processes and their associated costs. Other potential benefits include providing cost data for sites to perform consistent cost/benefit analysis of waste minimization and pollution prevention (WMIN/PP) options identified during pollution prevention opportunity assessments and providing a means for prioritizing and allocating limited resources for WMIN/PP.

Hsu, K.; Burns, M.; Priebe, S.; Robinson, P.

1995-01-01T23:59:59.000Z

214

Apportioning Climate Change Costs  

E-Print Network [OSTI]

Apportioning Climate Change Costs Daniel A. Farber* I. II.ON CLIMATE CHANGE FOUR QUESTIONS ABOUTof how to respond to climate change. Most public attention

Farber, Daniel A.

2008-01-01T23:59:59.000Z

215

Transmission Lines Emulating Moving Media  

E-Print Network [OSTI]

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

216

Midwest Transmission Workshop III Summary  

SciTech Connect (OSTI)

OAK-B135 On March 12-13, 2002, the National Wind Coordinating Committee (NWCC), in cooperation with regional stakeholders, held a two-day workshop: Planning for Electrical Transmission Needs in the Upper Midwest. The workshop was the outgrowth of an effort to develop a forum and process for consideration of transmission options that strives for equitable allocation of benefits and impacts among all affected parties. The goal of this workshop was to provide a catalyst for an enhanced, inclusive process for transmission planning with participation of and acceptance by all affected stakeholders. Participants in the meeting included representatives of state and regional regulatory agencies, utilities and power generators, the wind industry, environmental and landowner interests, and other interested parties (see Attachment A for a list of meeting participants).

Kevin Bryan

2003-03-12T23:59:59.000Z

217

The US market for high-temperature superconducting wire in transmission cable applications  

SciTech Connect (OSTI)

Telephone interviews were conducted with 23 utility engineers concerning the future prospects for high-temperature superconducting (HTS) transmission cables. All have direct responsibility for transmission in their utility, most of them in a management capacity. The engineers represented their utilities as members of the Electric Power Research Institute`s Underground Transmission Task Force (which has since been disbanded). In that capacity, they followed the superconducting transmission cable program and are aware of the cryogenic implications. Nineteen of the 23 engineers stated the market for underground transmission would grow during the next decade. Twelve of those specified an annual growth rate; the average of these responses was 5.6%. Adjusting that figure downward to incorporate the remaining responses, this study assumes an average growth rate of 3.4%. Factors driving the growth rate include the difficulty in securing rights-of-way for overhead lines, new construction techniques that reduce the costs of underground transmission, deregulation, and the possibility that public utility commissions will allow utilities to include overhead costs in their rate base. Utilities have few plans to replace existing cable as preventive maintenance, even though much of the existing cable has exceeded its 40-year lifetime. Ten of the respondents said the availability of a superconducting cable with the same life-cycle costs as a conventional cable and twice the ampacity would induce them to consider retrofits. The respondents said a cable with those characteristics would capture 73% of their cable retrofits.

Forbes, D.

1996-04-01T23:59:59.000Z

218

Cost effectiveness of recycling: A systems model  

SciTech Connect (OSTI)

Highlights: • Curbside collection of recyclables reduces overall system costs over a range of conditions. • When avoided costs for recyclables are large, even high collection costs are supported. • When avoided costs for recyclables are not great, there are reduced opportunities for savings. • For common waste compositions, maximizing curbside recyclables collection always saves money. - Abstract: Financial analytical models of waste management systems have often found that recycling costs exceed direct benefits, and in order to economically justify recycling activities, externalities such as household expenses or environmental impacts must be invoked. Certain more empirically based studies have also found that recycling is more expensive than disposal. Other work, both through models and surveys, have found differently. Here we present an empirical systems model, largely drawn from a suburban Long Island municipality. The model accounts for changes in distribution of effort as recycling tonnages displace disposal tonnages, and the seven different cases examined all show that curbside collection programs that manage up to between 31% and 37% of the waste stream should result in overall system savings. These savings accrue partially because of assumed cost differences in tip fees for recyclables and disposed wastes, and also because recycling can result in a more efficient, cost-effective collection program. These results imply that increases in recycling are justifiable due to cost-savings alone, not on more difficult to measure factors that may not impact program budgets.

Tonjes, David J., E-mail: david.tonjes@stonybrook.edu [Department of Technology and Society, College of Engineering and Applied Sciences, Stony Brook University, Stony Brook, NY 11794-3560 (United States); Waste Reduction and Management Institute, School of Marine and Atmospheric Sciences, Stony Brook University, Stony Brook, NY 11794-5000 (United States); Center for Bioenergy Research and Development, Advanced Energy Research and Technology Center, Stony Brook University, 1000 Innovation Rd., Stony Brook, NY 11794-6044 (United States); Mallikarjun, Sreekanth, E-mail: sreekanth.mallikarjun@stonybrook.edu [Department of Technology and Society, College of Engineering and Applied Sciences, Stony Brook University, Stony Brook, NY 11794-3560 (United States)

2013-11-15T23:59:59.000Z

219

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

transmission right, electricity auction, simultaneous feasibility, transmission pricing. I. INTRODUCTION POINT

220

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

, transmission pricing. I. INTRODUCTION POINT-TO-POINT financial transmission rights (FTRs) (see [2] and [7

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Reliable, Lightweight Transmissions For Off-Shore, Utility Scale Wind Turbines  

SciTech Connect (OSTI)

The objective of this project was to reduce the technical risk for a hydrostatic transmission based drivetrain for high-power utility-size wind turbines. A theoretical study has been performed to validate the reduction of cost of energy (CoE) for the wind turbine, identify risk mitigation strategies for the drive system and critical components, namely the pump, shaft connection and hydrostatic transmission (HST) controls and address additional benefits such as reduced deployment costs, improved torque density and improved mean time between repairs (MTBR).

Jean-Claude Ossyra

2012-10-25T23:59:59.000Z

223

Abstract--In an open access power market, power tracing is a very important issue as it can help allocate the total cost of  

E-Print Network [OSTI]

it a desired method for transmission pricing. This work has been supported by the National Science increasing complexity and the associated computations costs. Index Terms--Electricity market, transmission pricing, Short Run Marginal Cost (SRMC). I. INTRODUCTION LECTRICITY MARKET design and operation have

Cañizares, Claudio A.

224

Average System Cost Methodology : Administrator's Record of Decision.  

SciTech Connect (OSTI)

Significant features of average system cost (ASC) methodology adopted are: retention of the jurisdictional approach where retail rate orders of regulartory agencies provide primary data for computing the ASC for utilities participating in the residential exchange; inclusion of transmission costs; exclusion of construction work in progress; use of a utility's weighted cost of debt securities; exclusion of income taxes; simplification of separation procedures for subsidized generation and transmission accounts from other accounts; clarification of ASC methodology rules; more generous review timetable for individual filings; phase-in of reformed methodology; and each exchanging utility must file under the new methodology within 20 days of implementation by the Federal Energy Regulatory Commission of the ten major participating utilities, the revised ASC will substantially only affect three. (PSB)

United States. Bonneville Power Administration.

1984-06-01T23:59:59.000Z

225

An Examination of Avoided Costs in Utah  

E-Print Network [OSTI]

existing avoided cost methodology and established thefor certain avoided cost methodologies or avoided cost inpu

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

226

Decommissioning Unit Cost Data  

SciTech Connect (OSTI)

The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

Sanford, P. C.; Stevens, J. L.; Brandt, R.

2002-02-26T23:59:59.000Z

227

Power superconducting power transmission cable  

DOE Patents [OSTI]

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

228

Power Transmission, Distribution and Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Transmission, Distribution and Plants A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Abdel-Aal, Radwan E. - Computer Engineering Department, King Fahd University of...

229

COST 526 Project CH4 Final Report  

E-Print Network [OSTI]

1 COST 526 ­ Project CH4 Final Report Modelling, Simulating and Analysing EQ-Casting and Quenching. Remark: Due to the delay of the funding of the proposed investment casting project we change the focus of the project. The development of an Open Source optimization tool (see collaboration) was a relevant

230

Life Cycle Cost Housing Need and Sustainability  

E-Print Network [OSTI]

Life Cycle Cost Housing Need and Sustainability Abstract: Jordan is actually facing a rapid urban became difficult to sustain especially concerning the slum areas and the environmental pollution due which could contribute to increase the productivity and sustainability taking into consideration

231

Identification and definition of unbundled electric generation and transmission services  

SciTech Connect (OSTI)

State and federal regulators, private and public utilities, large and small customers, power brokers and marketers, and others are engaged in major debates about the future structure of the electric industry. Although the outcomes are far from certain, it seems clear that customers will have much greater choices about the electric services they purchase and from whom they buy these services. This report examines the ``ancillary`` services that are today buried within the typical vertically integrated utility. These ancillary services support and make possible the provision of the basic services of generating capacity, energy supply, and power delivery. These ancillary services include: Management of generating units; reserve generating capacity to follow variations in customer loads, to provide capacity and energy when generating units or transmission lines suddenly fall, to maintain electric-system stability, and to provide local-area security; transmission-system monitoring and control; replacement of real power and energy losses; reactive-power management and voltage regulation; transmission reserves; repair and maintenance of the transmission network; metering, billing, and communications; and assurance of appropriate levels of power quality. Our focus in this report, the first output from a larger Oak Ridge National Laboratory project, is on identification and definition of these services. Later work in this project will examine more closely the costs and pricing options for each service.

Kirby, B.; Hirst, E.; Vancoevering, J.

1995-03-01T23:59:59.000Z

232

Wireless Sensor Network for Electric Transmission Line Monitoring  

SciTech Connect (OSTI)

Generally, federal agencies tasked to oversee power grid reliability are dependent on data from grid infrastructure owners and operators in order to obtain a basic level of situational awareness. Since there are many owners and operators involved in the day-to-day functioning of the power grid, the task of accessing, aggregating and analyzing grid information from these sources is not a trivial one. Seemingly basic tasks such as synchronizing data timestamps between many different data providers and sources can be difficult as evidenced during the post-event analysis of the August 2003 blackout. In this project we investigate the efficacy and cost effectiveness of deploying a network of wireless power line monitoring devices as a method of independently monitoring key parts of the power grid as a complement to the data which is currently available to federal agencies from grid system operators. Such a network is modeled on proprietary power line monitoring technologies and networks invented, developed and deployed by Genscape, a Louisville, Kentucky based real-time energy information provider. Genscape measures transmission line power flow using measurements of electromagnetic fields under overhead high voltage transmission power lines in the United States and Europe. Opportunities for optimization of the commercial power line monitoring technology were investigated in this project to enable lower power consumption, lower cost and improvements to measurement methodologies. These optimizations were performed in order to better enable the use of wireless transmission line monitors in large network deployments (perhaps covering several thousand power lines) for federal situational awareness needs. Power consumption and cost reduction were addressed by developing a power line monitor using a low power, low cost wireless telemetry platform known as the ''Mote''. Motes were first developed as smart sensor nodes in wireless mesh networking applications. On such a platform, it has been demonstrated in this project that wireless monitoring units can effectively deliver real-time transmission line power flow information for less than $500 per monitor. The data delivered by such a monitor has during the course of the project been integrated with a national grid situational awareness visualization platform developed by Oak Ridge National Laboratory. Novel vibration energy scavenging methods based on piezoelectric cantilevers were also developed as a proposed method to power such monitors, with a goal of further cost reduction and large-scale deployment. Scavenging methods developed during the project resulted in 50% greater power output than conventional cantilever-based vibrational energy scavenging devices typically used to power smart sensor nodes. Lastly, enhanced and new methods for electromagnetic field sensing using multi-axis magnetometers and infrared reflectometry were investigated for potential monitoring applications in situations with a high density of power lines or high levels of background 60 Hz noise in order to isolate power lines of interest from other power lines in close proximity. The goal of this project was to investigate and demonstrate the feasibility of using small form factor, highly optimized, low cost, low power, non-contact, wireless electric transmission line monitors for delivery of real-time, independent power line monitoring for the US power grid. The project was divided into three main types of activity as follows; (1) Research into expanding the range of applications for non-contact power line monitoring to enable large scale low cost sensor network deployments (Tasks 1, 2); (2) Optimization of individual sensor hardware components to reduce size, cost and power consumption and testing in a pilot field study (Tasks 3,5); and (3) Demonstration of the feasibility of using the data from the network of power line monitors via a range of custom developed alerting and data visualization applications to deliver real-time information to federal agencies and others tasked with grid reliability (Tasks 6,8)

Alphenaar, Bruce

2009-06-30T23:59:59.000Z

233

RAPID/BulkTransmission/Transmission Siting & Interconnection | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: EnergyPotentialUrbanUtilityScalePVCapacityPulaskiRAPID/BulkTransmission/Texas < RAPID‎ |

234

Estimating Renewable Energy Costs  

Broader source: Energy.gov [DOE]

Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically...

235

Cost Estimating Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

2011-05-09T23:59:59.000Z

236

Investments of uncertain cost  

E-Print Network [OSTI]

I study irreversible investment decisions when projects take time to complete, and are subject to two types of uncertainty over the cost of completion. The first is technical uncertainty, i.e., uncertainty over the amount ...

Pindyck, Robert S.

1992-01-01T23:59:59.000Z

237

The integration of renewable energy sources into electric power transmission systems  

SciTech Connect (OSTI)

Renewable energy technologies such as photovoltaics, solar thermal power plants, and wind turbines are nonconventional, environmentally attractive sources of energy that can be considered for electric power generation. Many of the areas with abundant renewable energy resources (very sunny or windy areas) are far removed from major load centers. Although electrical power can be transmitted over long distances of many hundreds of miles through high-voltage transmission lines, power transmission systems often operate near their limits with little excess capacity for new generation sources. This study assesses the available capacity of transmission systems in designated abundant renewable energy resource regions and identifies the requirements for high-capacity plant integration in selected cases. In general, about 50 MW of power from renewable sources can be integrated into existing transmission systems to supply local loads without transmission upgrades beyond the construction of a substation to connect to the grid. Except in the Southwest, significant investment to strengthen transmission systems will be required to support the development of high-capacity renewable sources of 1000 MW or greater in areas remote from major load centers. Cost estimates for new transmission facilities to integrate and dispatch some of these high-capacity renewable sources ranged from several million dollars to approximately one billion dollars, with the latter figure an increase in total investment of 35%, assuming that the renewable source is the only user of the transmission facility.

Barnes, P.R.; Dykas, W.P.; Kirby, B.J.; Purucker, S.L. [Oak Ridge National Lab., TN (United States); Lawler, J.S. [Univ. of Tennessee, Knoxville, TN (United States)

1995-07-01T23:59:59.000Z

238

Transmission  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatusButler Tina ButlerTodayTransForumEnergyTransit

239

Standard costs for labor  

E-Print Network [OSTI]

STANDARD COSTS FOR LABOR A Thesis By MD. NURUL ABSAR KHAN Submitted to the Graduate School of the Agricultural and Mechanical College of Texms in partial fulfillment of the requirements for the degree of MASTER OF BUSINESS ADMINISTRATION... January 1960 Ma/or Sub)acts Accounting STANOAHD COSTS FOR LABOR ND, NURUL ABSAR KHAN Approved as t style and content bys Chairman of Committee Head of Hepartment January 1960 The author acknowledges his indebtedness to Mr. T. M. Leland, Mr. T. D...

Khan, Mohammed Nurul Absar

1960-01-01T23:59:59.000Z

240

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

ZLWK:LQG3RZHU´&RQIHUHQFHRQ Wind Power for the 21 st Century,Large-scale baseload wind power in China. Natural Resourceseconomics of large-scale wind power in a carbon constrained

Wiser, Ryan

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

focused approach, a new wind generator located near theallow the output of the wind generator to displace the power

Wiser, Ryan

2014-01-01T23:59:59.000Z

242

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

Grid. 2006. Trans mission and Wind Energy: Capturing theour sample. 20% Wind Energy: Wind Deployment System (WinDS)and Renewable Energy (Wind & Hydropower Technologies

Wiser, Ryan

2014-01-01T23:59:59.000Z

243

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

Examples in Europe. Renewable Energy 33, no. 8 (August):mission Expansion and Renewable Energy Policies . DiscussionS tory So F ar . National Renewable Energy Laboratory. NREL/

Wiser, Ryan

2014-01-01T23:59:59.000Z

244

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

turbines and compressed air energy storage for supplementalThe value of compressed air energy storage with wind inresources and compressed air energy storage (CAES). Energy

Wiser, Ryan

2014-01-01T23:59:59.000Z

245

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

3] U.S. Department of Energy (DOE). 2008. 20% Wind Energy by2030: Increasing Wind Energy ' s Contribution to U. S .Trans mission and Wind Energy: Capturing the Prevailing

Wiser, Ryan

2014-01-01T23:59:59.000Z

246

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

kV JCSP 765 kV and 800 kV HVDC Southern California Edison (2 345 kV ERCOT - TOS - 3 345 kV and HVDC ERCOT - TOS - 4345 kV and HVDC Southwest Power Pool (SPP) SPP - 2 345 kV

Wiser, Ryan

2014-01-01T23:59:59.000Z

247

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

M. , 2009. 2008 Wind Technologies Market Report . DOE/GO-Reports.htm Quanta Technology, LLC. 2008. F inal Report onpublications/Quanta_Technology_March_2_2008_Update_to_the_

Wiser, Ryan

2014-01-01T23:59:59.000Z

248

Midwest Transmission Workshop II Summary  

SciTech Connect (OSTI)

OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

Kevin Bryan

2002-12-05T23:59:59.000Z

249

Florida Electric Transmission Line Siting Act (Florida)  

Broader source: Energy.gov [DOE]

The Transmission Line Siting Act (TLSA) is the state’s centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15...

250

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

251

Coiled transmission line pulse generators  

DOE Patents [OSTI]

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

252

Articles about Grid Integration and Transmission  

Broader source: Energy.gov [DOE]

Stories about grid integration and transmission featured by the U.S. Department of Energy (DOE) Wind Program.

253

Transmission Dr. Sandra Cruz-Pol  

E-Print Network [OSTI]

Transmission Lines Dr. Sandra Cruz-Pol ECE Dept. UPRM Exercise 11.3 n A 40-m long TL has Vg=15 Vrms to electric circuits! cmc kmc GHz Hz 15000,000,2000/ 000,560/ 2 60 == == Transmission Lines I. TL parameters-wave transformer ¨ Slotted line ¨ Single stub VI. Microstrips Transmission Lines (TL) n TL have two conductors

Cruz-Pol, Sandra L.

254

A simplified and scalable should-cost tool in the oilfield services industry  

E-Print Network [OSTI]

Third party spend accounts for a significant amount of a business' costs. When procuring unique, highly-engineered components, this cost is often negotiated with suppliers during the procurement process. Due to the limited ...

Mealer, Clayton M

2013-01-01T23:59:59.000Z

255

Integrated Transmission and Distribution Control  

SciTech Connect (OSTI)

Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

2013-01-16T23:59:59.000Z

256

Transmission dynamics and economics of rabies control in dogs and humans in an African city  

E-Print Network [OSTI]

reported in N Dja- me´na, the capital of Chad. The estimated transmission rates be- tween dogs ( d) were 0-effectiveness is estimated at US $46 per disability adjusted life-years averted. Cost-effectiveness for PEP, together in tropical resource- limited countries (1). In Africa and Asia, an estimated 24,000 to 70,000 people die

Richner, Heinz

257

Transmission Design at the National Level: Benefits, Risks and Possible Paths Forward  

E-Print Network [OSTI]

James Bushnell University of California, Davis PSERC Publication 12-01 May 2012 #12;Information about to move electric energy interregionally is limited to the capacity of the existing transmission system, the levelized cost of energy production for renewables (e.g., wind, solar, and deep geoth

258

The Market Value and Cost of Solar Photovoltaic Electricity Production  

E-Print Network [OSTI]

have a much higher cost per kWh produced than baseload coal,life to 30 years on the cost per kWh is fairly small due tocosts through non-energy payments, which are incorporated as a constant per-kWh

Borenstein, Severin

2008-01-01T23:59:59.000Z

259

Roadway Improvement Project Cost Allocation  

E-Print Network [OSTI]

Roadway Improvement Project Cost Allocation CTS 21st Annual Transportation Research Conference costs #12;Potential Applications · Roadway Project Feasibility Studies ­ Identified potential roadway infrastructure improvement ­ Documentation of estimated project costs ­ Determine property assessments

Minnesota, University of

260

Sunk Costs and Competitive Bidding  

E-Print Network [OSTI]

SUNK COSTS AND COMPETITIVE BIDDING Kenneth R. FrenchRevised: November 1982 SUNK COSTS AND COMPETITIVE BIDDINGl the winning bid be? I f sunk costs do not matter, I f the

French, Kenneth R.; McCormick, Robert E.

1982-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Mandatory Photovoltaic System Cost Analysis  

Broader source: Energy.gov [DOE]

The Arizona Corporation Commission requires electric utilities to conduct a cost/benefit analysis to compare the cost of line extension with the cost of installing a stand-alone photovoltaic (PV)...

262

Factors Impacting Decommissioning Costs - 13576  

SciTech Connect (OSTI)

The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

Kim, Karen; McGrath, Richard [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)] [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)

2013-07-01T23:59:59.000Z

263

Comments of New England Electric Transmission Corporation on...  

Broader source: Energy.gov (indexed) [DOE]

out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and...

264

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian...  

Energy Savers [EERE]

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands...

265

Fact #850: December 8, 2014 Automatic Transmissions have closed...  

Broader source: Energy.gov (indexed) [DOE]

Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed...

266

QGESS: Capital Cost Scaling Methodology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(costs and values of inputs, outputs, and processes, including capital and operating costs) and performance (mass conversion, energy efficiency, and, generally speaking,...

267

Cost Methodology for Biomass Feedstocks: Herbaceous Crops and Agricultural Residues  

SciTech Connect (OSTI)

This report describes a set of procedures and assumptions used to estimate production and logistics costs of bioenergy feedstocks from herbaceous crops and agricultural residues. The engineering-economic analysis discussed here is based on methodologies developed by the American Society of Agricultural and Biological Engineers (ASABE) and the American Agricultural Economics Association (AAEA). An engineering-economic analysis approach was chosen due to lack of historical cost data for bioenergy feedstocks. Instead, costs are calculated using assumptions for equipment performance, input prices, and yield data derived from equipment manufacturers, research literature, and/or standards. Cost estimates account for fixed and variable costs. Several examples of this costing methodology used to estimate feedstock logistics costs are included at the end of this report.

Turhollow Jr, Anthony F [ORNL; Webb, Erin [ORNL; Sokhansanj, Shahabaddine [ORNL

2009-12-01T23:59:59.000Z

268

Reformulated gasoline: Costs and refinery impacts  

SciTech Connect (OSTI)

Studies of reformulated gasoline (RFG) costs and refinery impacts have been performed with the Oak Ridge National Laboratory Refinery Yield Model (ORNL-RYM), a linear program which has been updated to blend gasolines to satisfy emissions constraints defined by preliminary complex emissions models. Policy makers may use the reformulation cost knee (the point at which costs start to rise sharply for incremental emissions control) to set emissions reduction targets, giving due consideration to the differences between model representations and actual refining operations. ORNL-RYM estimates that the reformulation cost knee for the US East Coast (PADD I) is about 15.2 cents per gallon with a 30 percent reduction of volatile organic compounds (VOCs). The estimated cost knee for the US Gulf Coast (PADD III) is about 5.5 cents per gallon with a VOC reduction of 35 percent. Reid vapor pressure (RVP) reduction is the dominant VOC reduction mechanism. Even with anti-dumping constraints, conventional gasoline appears to be an important sink which permits RFG to be blended with lower aromatics and sulfur contents in PADD III. In addition to the potentially large sensitivity of RFG production to different emissions models, RFG production is sensitive to the non-exhaust VOC share assumption for a particular VOC model. ORNL-RYM has also been used to estimate the sensitivity of RFG production to the cost of capital; to the RVP requirements for conventional gasoline; and to the percentage of RFG produced in a refining region.

Hadder, G.R.

1994-02-01T23:59:59.000Z

269

Modification of light transmission channels by inhomogeneous absorption in random media  

E-Print Network [OSTI]

Optical absorption is omnipresent and very often distributed non-uniformly in space. We present a numerical study on the effects of inhomogeneous absorption on transmission eigenchannels of light in highly scattering media. In the weak absorption regime, the spatial profile of a transmission channel remains very similar to that without absorption, and the effect of inhomogeneous absorption can be stronger or weaker than homogeneous absorption depending on the spatial overlap of the localized absorbing region with the field intensity maximum of the channel. In the strong absorption regime, the high transmission channels redirect the energy flows to circumvent the absorbing regions to minimize loss. The attenuation of high transmission channels by inhomogeneous absorption is lower than that by homogeneous absorption, regardless of the location of the absorbing region. The statistical distribution of transmission eigenvalues in the former becomes broader than that in the latter, due to a longer tail at high tran...

Liew, Seng Fatt

2015-01-01T23:59:59.000Z

270

Automated manual transmission shift sequence controller  

DOE Patents [OSTI]

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Richard G. (Royal Oak, MI); Rausen, David J. (Denver, CO)

2000-02-01T23:59:59.000Z

271

Automated manual transmission mode selection controller  

DOE Patents [OSTI]

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI)

1999-11-09T23:59:59.000Z

272

Time Domain Partitioning of Electricity Production Cost Simulations  

SciTech Connect (OSTI)

Production cost models are often used for planning by simulating power system operations over long time horizons. The simulation of a day-ahead energy market can take several weeks to compute. Tractability improvements are often made through model simplifications, such as: reductions in transmission modeling detail, relaxation of commitment variable integrality, reductions in cost modeling detail, etc. One common simplification is to partition the simulation horizon so that weekly or monthly horizons can be simulated in parallel. However, horizon partitions are often executed with overlap periods of arbitrary and sometimes zero length. We calculate the time domain persistence of historical unit commitment decisions to inform time domain partitioning of production cost models. The results are implemented using PLEXOS production cost modeling software in an HPC environment to improve the computation time of simulations while maintaining solution integrity.

Barrows, C.; Hummon, M.; Jones, W.; Hale, E.

2014-01-01T23:59:59.000Z

273

Low Cost, Durable Seal  

SciTech Connect (OSTI)

Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

Roberts, George; Parsons, Jason; Friedman, Jake

2010-12-17T23:59:59.000Z

274

Transmission Benefits of Co-Locating Concentrating Solar Power and Wind  

SciTech Connect (OSTI)

In some areas of the U.S. transmission constraints are a limiting factor in deploying new wind and concentrating solar power (CSP) plants. Texas is an example of one such location, where the best wind and solar resources are in the western part of the state, while major demand centers are in the east. The low capacity factor of wind is a compounding factor, increasing the relative cost of new transmission per unit of energy actually delivered. A possible method of increasing the utilization of new transmission is to co-locate both wind and concentrating solar power with thermal energy storage. In this work we examine the benefits and limits of using the dispatachability of thermal storage to increase the capacity factor of new transmission developed to access high quality solar and wind resources in remote locations.

Sioshansi, R.; Denholm, P.

2012-03-01T23:59:59.000Z

275

Dynamic Power Flow Controller: Compact Dynamic Phase Angle Regulators for Transmission Power Routing  

SciTech Connect (OSTI)

GENI Project: Varentec is developing compact, low-cost transmission power controllers with fractional power rating for controlling power flow on transmission networks. The technology will enhance grid operations through improved use of current assets and by dramatically reducing the number of transmission lines that have to be built to meet increasing contributions of renewable energy sources like wind and solar. The proposed transmission controllers would allow for the dynamic control of voltage and power flow, improving the grid’s ability to dispatch power in real time to the places where it is most needed. The controllers would work as fail-safe devices whereby the grid would be restored to its present operating state in the event of a controller malfunction instead of failing outright. The ability to affordably and dynamically control power flow with adequate fail-safe switchgear could open up new competitive energy markets which are not possible under the current regulatory structure and technology base.

None

2012-01-03T23:59:59.000Z

276

Evaluation of Global Onshore Wind Energy Potential and Generation Costs  

SciTech Connect (OSTI)

In this study, we develop an updated global estimate of onshore wind energy potential using reanalysis wind speed data, along with updated wind turbine technology performance and cost assumptions as well as explicit consideration of transmission distance in the calculation of transmission costs. We find that wind has the potential to supply a significant portion of world energy needs, although this potential varies substantially by region as well as with assumptions such as on what types of land can be used to site wind farms. Total global wind potential under central assumptions is estimated to be approximately 89 petawatt hours per year at less than 9 cents/kWh with substantial regional variations. One limitation of global wind analyses is that the resolution of current global wind speed reanalysis data can result in an underestimate of high wind areas. A sensitivity analysis of eight key parameters is presented. Wind potential is sensitive to a number of input parameters, particularly those related to land suitability and turbine density as well as cost and financing assumptions which have important policy implications. Transmission cost has a relatively small impact on total wind costs, changing the potential at a given cost by 20-30%. As a result of sensitivities studied here we suggest that further research intended to inform wind supply curve development focus not purely on physical science, such as better resolved wind maps, but also on these less well-defined factors, such as land-suitability, that will also have an impact on the long-term role of wind power.

Zhou, Yuyu; Luckow, Patrick; Smith, Steven J.; Clarke, Leon E.

2012-06-20T23:59:59.000Z

277

Announcement due to MSVE Department  

E-Print Network [OSTI]

Announcement due to MSVE Department 2 weeks prior to defense Student revises Thesis GPD revises Thesis and returns to student Student revises Thesis Professional editor reviews Thesis original signatures on five copies Student revises Thesis Student takes final five copies to Registrar

278

Made in China, Mined in Australia: Interdependency and Business-Cycle Transmission between Chinese and Australian Industries  

E-Print Network [OSTI]

1 Made in China, Mined in Australia: Interdependency and Business- Cycle Transmission between of interdependence between Australia and China due to the transmission of economic shocks between production in the two countries. I analyse two models to ascertain the impact of Chinese development on Australia

279

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

280

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, R.B.

1985-08-15T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Relativistic tunneling and accelerated transmission  

E-Print Network [OSTI]

We obtain the solutions for the tunneling zone of a one-dimensional electrostatic potential in the relativistic (Dirac to Klein-Gordon) wave equation regime when the incoming wave packet exhibits the possibility of being almost totally transmitted through the potential barrier. The conditions for the occurrence of accelerated and, eventually, superluminal tunneling transmission probabilities are all quantified and the problematic superluminal interpretation originated from the study based on non-relativistic dynamics of tunneling is overcome. The treatment of the problem suggests revealing insights into condensed-matter experiments using electrostatic barriers in single- and bi-layer graphene, for which the accelerated tunneling effect deserves a more careful investigation.

Alex E. Bernardini

2007-06-26T23:59:59.000Z

282

Electric Transmission Line Siting Compact  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement Tuesday,DepartmentTheandElectric Transmission

283

Cost Type Examples Salary costs for staff working  

E-Print Network [OSTI]

. Equipment access charges Service contracts, running costs, materials and consumables and staff time

Rambaut, Andrew

284

Heliostat cost reduction study.  

SciTech Connect (OSTI)

Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David (Advanced Thermal Systems, Larkspur, CO); Kolb, Gregory J.; Donnelly, Matthew W.

2007-06-01T23:59:59.000Z

285

Cost-Optimized Attic Insulation Solution for Factory-Built Homes...  

Broader source: Energy.gov (indexed) [DOE]

attic insulation in manufactured housing has been a significant challenge due to cost, production, and transportation constraints. This 2014 Top Innovation highlights...

286

Hay Harvesting Costs $$$$$ in Texas.  

E-Print Network [OSTI]

Hay is an important crop in Ta 1 Harvesting costs constitute the major5 pense of hay production in many M Mg and Wayne D . Taylor INTRODUCTION .................................................... 2 Fixed Costs or Ownership Costs... ............................................. 10 Totarl Cost .............................................................. 10 HAY HARVESTING ALTERNATIVES COMPARED ...................... 11 HOW TO MAKE WISE DECISIONS CONCERNING INVESTMENTS IN MACHINERY...

Long, James T.; Taylor, Wayne D.

1972-01-01T23:59:59.000Z

287

COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY GENERATION .............................................................................13 Definition of Levelized Cost ........................................................................................................13 Levelized Cost Components

288

COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY GENERATION............................................................ 3 Definition of Levelized Cost.................................................................................... 3 Levelized Cost Categories

Laughlin, Robert B.

289

Wind Integration, Transmission, and Resource Assessment andCharacteri...  

Broader source: Energy.gov (indexed) [DOE]

Integration, Transmission, and Resource Assessment and Characterization Projects Wind Integration, Transmission, and Resource Assessment and Characterization Projects From 2006 to...

290

Cost Estimating, Analysis, and Standardization  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

1984-11-02T23:59:59.000Z

291

Estimation of economic impact of freight distribution due to highway closure  

E-Print Network [OSTI]

The main aim of this study is to provide a theoretical framework and methodology to estimate and analyze the economic impact of freight disruption due to highway closure. The costs in this study will be classified into ...

Hu, Shiyin

2008-01-01T23:59:59.000Z

292

Low-Cost Fiber Optic Pressure Sensor  

DOE Patents [OSTI]

The size and cost of fabricating fiber optic pressure sensors is reduced by fabricating the membrane of the sensor in a non-planar shape. The design of the sensors may be made in such a way that the non-planar membrane becomes a part of an air-tight cavity, so as to make the membrane resilient due to the air-cushion effect of the air-tight cavity. Such non-planar membranes are easier to make and attach.

Sheem, Sang K. (Pleasanton, CA)

2003-07-22T23:59:59.000Z

293

Low-Cost Fiber Optic Pressure Sensor  

DOE Patents [OSTI]

The size and cost of fabricating fiber optic pressure sensors is reduced by fabricating the membrane of the sensor in a non-planar shape. The design of the sensors may be made in such a way that the non-planar membrane becomes a part of an air-tight cavity, so as to make the membrane resilient due to the air-cushion effect of the air-tight cavity. Such non-planar membranes are easier to make and attach.

Sheem, Sang K. (Pleasanton, CA)

2004-05-18T23:59:59.000Z

294

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

295

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

296

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

SciTech Connect (OSTI)

The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this paper we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33percent of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33percent RE target across nearly all scenarios analyzed (38-65percent). Solar energy is almost always the second largest source (14-41percent). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Further, we find that even with total transmission expenditures of $17-34 billion these costs still represent just 10-19percent of the total delivered cost of renewable energy.

Mills, Andrew D.; Phadke, Amol A.; Wiser, Ryan H.

2010-06-10T23:59:59.000Z

297

Geothermal probabilistic cost study  

SciTech Connect (OSTI)

A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model is used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents are analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance are examined. (MHR)

Orren, L.H.; Ziman, G.M.; Jones, S.C.; Lee, T.K.; Noll, R.; Wilde, L.; Sadanand, V.

1981-08-01T23:59:59.000Z

298

Low-Cost Spectral Sensor Development Description.  

SciTech Connect (OSTI)

Solar spectral data for all parts of the US is limited due in part to the high cost of commercial spectrometers. Solar spectral information is necessary for accurate photovoltaic (PV) performance forecasting, especially for large utility-scale PV installations. A low-cost solar spectral sensor would address the obstacles and needs. In this report, a novel low-cost, discrete- band sensor device, comprised of five narrow-band sensors, is described. The hardware is comprised of commercial-off-the-shelf components to keep the cost low. Data processing algorithms were developed and are being refined for robustness. PV module short-circuit current ( I sc ) prediction methods were developed based on interaction-terms regression methodology and spectrum reconstruction methodology for computing I sc . The results suggest the computed spectrum using the reconstruction method agreed well with the measured spectrum from the wide-band spectrometer (RMS error of 38.2 W/m 2 -nm). Further analysis of computed I sc found a close correspondence of 0.05 A RMS error. The goal is for ubiquitous adoption of the low-cost spectral sensor in solar PV and other applications such as weather forecasting.

Armijo, Kenneth Miguel; Yellowhair, Julius

2014-11-01T23:59:59.000Z

299

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

commercial building energy use and cost analysis. With input of building layout, construction types, space usage,

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

300

Transmission Reassignment Reporting Requirement - April 2, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Transmission Reassignment Reporting Requirement This notice...

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Transmission and Generation Investment in Electricity Markets  

E-Print Network [OSTI]

Mar 4, 2015 ... The model incorporates investment decisions of the transmission operator and private firms in expectation of an energy-only market and ...

Grimm Veronika

2015-03-04T23:59:59.000Z

302

2009 National Electric Transmission Congestion Study - Oklahoma...  

Broader source: Energy.gov (indexed) [DOE]

- Oklahoma City Workshop 2009 National Electric Transmission Congestion Study - Oklahoma City Workshop On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City,...

303

Natural Gas Transmission Pipeline Siting Act (Florida)  

Broader source: Energy.gov [DOE]

This Act establishes a centralized and coordinated permitting process for the location of natural gas transmission pipeline corridors and the construction and maintenance of natural gas...

304

Final Report Navajo Transmission Project (NTP)  

SciTech Connect (OSTI)

The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

Bennie Hoisington; Steven Begay

2006-09-14T23:59:59.000Z

305

Transmission Expansion Planning Using an AC Model ...  

E-Print Network [OSTI]

Western Interconnection” under contract DOE-FOA0000068. ... problem to determine locations for placing new transmission ... KNITRO and BONMIN are de

Periodicals

2013-01-02T23:59:59.000Z

306

SunZia Southwest Transmission Project Comments  

Energy Savers [EERE]

Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

307

2012 National Electric Transmission Congestion Study: Preliminary...  

Broader source: Energy.gov (indexed) [DOE]

Meyer Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 2012 National Electric Transmission Congestion Study Preliminary Findings Stakeholder...

308

Energy Department, Arizona Utilities Announce Transmission Infrastruct...  

Office of Environmental Management (EM)

project that will serve the state's growing electrical energy needs, attract renewable energy development to the area, and strengthen the transmission system in the Southwestern...

309

Exploring the Business Link Opportunity: Transmission & Clean...  

Energy Savers [EERE]

Jennifer Weddle, Greenberg Traurig LLP Rapid Response Team for Transmission: Laura Smith Morton, DOE Energy Storage: Michael Stosser, Day Pitney LLP Centennial West Clean...

310

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

311

Flexible Transmission in the Smart Grid  

E-Print Network [OSTI]

New England Outlook: Smart Grid is About Consumers,” Apr. [Transmission in the Smart Grid By Kory Walter Hedman ATransmission in the Smart Grid by Kory Walter Hedman Doctor

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

312

Detonator comprising a nonlinear transmission line  

DOE Patents [OSTI]

Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

Elizondo-Decanini, Juan M

2014-12-30T23:59:59.000Z

313

TransWest Express Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of the Anschutz Corporation. The Project consists of an overhead transmission line extending approximately 725 miles from south-central Wyoming crossing Colorado and...

314

After Cajun, what next for stranded costs?  

SciTech Connect (OSTI)

Members of FERC have said that the Cajun decision does not pose a serious problem to its proposed rulemaking on stranded costs. But the D.C. Circuit`s Cajun decision, criticizing the concept of recovery for stranded investment in broad terms, promises to make that task difficult, if not impossible. The United States Court of Appeals for the District of Columbia Circuit, in its July 12, 1994 opinion in Cajun Electric Power Cooperative, Inc. v. Federal Energy Regulatory Commission, subjected the Entergy Corporations`s transmission tariff`s stranded investment provision to broad and, perhaps, fatal criticism. The Cajun opinion, premised on basic concepts of antitrust law, was issued at a time of substantial industry discussion on the concept of stranded investment and should greatly impact the decisions of both federal and state regulators on stranded investment.

Pembroke, J.D.

1994-10-01T23:59:59.000Z

315

LIFE Cost of Electricity, Capital and Operating Costs  

SciTech Connect (OSTI)

Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

Anklam, T

2011-04-14T23:59:59.000Z

316

Abstract--Electric energy transmission is essential for the operation of competitive energy markets. Transmission  

E-Print Network [OSTI]

1 Abstract-- Electric energy transmission is essential for the operation of competitive energy markets. Transmission expansion planning has been defined as a complex combinatorial optimization problem. The model proposed generates expansion plans under the Pareto optimality approach. It shows acceptable

Catholic University of Chile (Universidad Católica de Chile)

317

CHANGES OF SYSTEM OPERATION COSTS DUE TO LARGE-SCALE WIND INTEGRATION  

E-Print Network [OSTI]

energy markets large amounts of fluctuating renewable energy sources for electricity production (RES and the electricity market. In order to cope with the fluctuations in the wind power production, other units in electricity markets Summary (max. 100 words) Within the European Union large amounts of intermittent wind

318

Cost uncertainty for different levels of technology maturity  

SciTech Connect (OSTI)

It is difficult at best to apply a single methodology for estimating cost uncertainties related to technologies of differing maturity. While highly mature technologies may have significant performance and manufacturing cost data available, less well developed technologies may be defined in only conceptual terms. Regardless of the degree of technical maturity, often a cost estimate relating to application of the technology may be required to justify continued funding for development. Yet, a cost estimate without its associated uncertainty lacks the information required to assess the economic risk. For this reason, it is important for the developer to provide some type of uncertainty along with a cost estimate. This study demonstrates how different methodologies for estimating uncertainties can be applied to cost estimates for technologies of different maturities. For a less well developed technology an uncertainty analysis of the cost estimate can be based on a sensitivity analysis; whereas, an uncertainty analysis of the cost estimate for a well developed technology can be based on an error propagation technique from classical statistics. It was decided to demonstrate these uncertainty estimation techniques with (1) an investigation of the additional cost of remediation due to beyond baseline, nearly complete, waste heel retrieval from underground storage tanks (USTs) at Hanford; and (2) the cost related to the use of crystalline silico-titanate (CST) rather than the baseline CS100 ion exchange resin for cesium separation from UST waste at Hanford.

DeMuth, S.F. [Los Alamos National Lab., NM (United States); Franklin, A.L. [Pacific Northwest National Lab., Richland, WA (United States)

1996-08-07T23:59:59.000Z

319

INDEPENDENT COST REVIEW (ICR)  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG | Department ofHTS Cable ProjectsHistoryia/802871 IA Blog|INDEPENDENT COST

320

Renewable Energy Transmission Initiative Phase 1A  

E-Print Network [OSTI]

Renewable Energy Transmission Initiative Phase 1A DRAFT REPORT MARCH 2008 RETI-1000-2008-001-D #12;RETI Stakeholder Steering Committee Renewable Energy Transmission Initiative Phase 1A DRAFT REPORT B are registered trademarks of Black & Veatch Holding Company #12;RETI Stakeholder Steering Committee Renewable

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM  

E-Print Network [OSTI]

RFC: 793 TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM PROTOCOL SPECIFICATION September 1981 Admiralty Way Marina del Rey, California 90291 #12;#12;September 1981 Transmission Control Protocol TABLE ........................................... 12 2.9 Precedence and Security ...................................... 13 2.10 Robustness Principle

McBrien, Peter

322

Executive Forum on Solutions to Transmission Investment  

E-Print Network [OSTI]

. California ISO CenterPoint Energy Duke Energy Entergy EPRI Exelon FirstEnergy GE Energy Institut de recherche Transmission Co. MidAmerican Energy Midwest Independent Transmission System Operator (MISO) National Grid USA National Rural Electric Coop. Assn. New York ISO New York Power Authority Pacific Gas and Electric PJM

323

Electric Transmission Line Flashover Prediction System  

E-Print Network [OSTI]

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

324

User cost in oil production  

E-Print Network [OSTI]

The assumption of an initial fixed mineral stock is superfluous and wrong. User cost (resource rent) in mineral production is the present value of expected increases in development cost. It can be measured as the difference ...

Adelman, Morris Albert

1990-01-01T23:59:59.000Z

325

Wind Integration Cost and Cost-Causation: Preprint  

SciTech Connect (OSTI)

The question of wind integration cost has received much attention in the past several years. The methodological challenges to calculating integration costs are discussed in this paper. There are other sources of integration cost unrelated to wind energy. A performance-based approach would be technology neutral, and would provide price signals for all technology types. However, it is difficult to correctly formulate such an approach. Determining what is and is not an integration cost is challenging. Another problem is the allocation of system costs to one source. Because of significant nonlinearities, this can prove to be impossible to determine in an accurate and objective way.

Milligan, M.; Kirby, B.; Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Martin-Martinez, S.; Gomez-Lazaro, E.; Peneda, I.; Smith, C.

2013-10-01T23:59:59.000Z

326

Check Estimates and Independent Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

1997-03-28T23:59:59.000Z

327

Cost Effectiveness NW Energy Coalition  

E-Print Network [OSTI]

1 Action 8 Cost Effectiveness Manual Kim Drury NW Energy Coalition Context · Inconsistent understanding of cost effectiveness contributed to under performing conservation E.g: individual measures vs Action Plan for Energy Efficiency published a comprehensive guide on cost effectiveness: best practices

328

Comparing rig power transmission systems  

SciTech Connect (OSTI)

Installed power on drilling rigs has increased steadily since the inception of rotary drilling technology as a result of technical advances and the need to penetrate deeper horizons. Higher power levels for the pumps, rotary table and drawworks are also required for drilling deep wells within an economically reasonable period. Power initially available on a rig had been about 35 kW on average, whereas power values on modern rigs drilling ultra-deep wells are on the order of several thousand kW. The installed power values on modern drilling rigs, subdivided with respect to depth range, are shown. After safety, economic factors are of paramount importance to rig operators. Among these, which include low acquisition cost, long service life and ease of maintenance, a particularly decisive factor is high efficiency.

Gutsche, W.; Noevig, T.

1989-04-01T23:59:59.000Z

329

Ownership Unbuilding in Electricity Markets - A Social Cost Benefit Analysis of the German TSO'S  

E-Print Network [OSTI]

OWNERSHIP UNBUNDLING IN ELECTRICITY MARKETS - A SOCIAL COST BENEFIT ANALYSIS OF THE GERMAN TSO’S Gert Brunekreeft1 Jacobs University Bremen Campus Ring 1 D-28759 Bremen Germany Email: g.brunekreeft@jacobs-university.de Version 2, August 11... , 2008 Abstract: This paper presents a social cost benefit analysis of ownership unbundling (as compared to legal und functional unbundling) of the electricity transmission system operators in Germany. The study relies on the Residual Supply Index...

Brunekreeft, Gert

330

COST SHARING Cost sharing is the portion of total project costs of a sponsored agreement that is not bourn by  

E-Print Network [OSTI]

1 COST SHARING Cost sharing is the portion of total project costs of a sponsored agreement. There are primarily three types of cost sharing that may occur on sponsored projects: Mandatory cost sharing. For example, the National Science Foundation requires mandatory cost sharing for some of its projects. COST

Cui, Yan

331

Realistic costs of carbon capture  

SciTech Connect (OSTI)

There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

Al Juaied, Mohammed (Harvard Univ., Cambridge, MA (US). Belfer Center for Science and International Affiaris); Whitmore, Adam (Hydrogen Energy International Ltd., Weybridge (GB))

2009-07-01T23:59:59.000Z

332

Cost Allocations of Transmission Network by Cooperative Game Theory; Nucleolus method1  

E-Print Network [OSTI]

Introduction In the last years the reforms as changes in the electric business it has increased rapidly

Catholic University of Chile (Universidad Católica de Chile)

333

A SCHEME FOR INCENTIVIZING INVESTMENTS AND COST SHARING IN TRANSMISSION ENHANCEMENTS  

E-Print Network [OSTI]

Contreras George Gross Isabel Ruiz­Gómez, José M. Arroyo Univ. of Castilla­La Mancha Univ. of Illinois Real, Spain Javier.Contreras@uclm.es gross@uiuc.edu isamaxys@hotmail.com, Jose

Gross, George

334

Transmission Line Jobs and Economic Development Impact (JEDI) Model User Reference Guide  

SciTech Connect (OSTI)

The Jobs and Economic Development Impact (JEDI) models, developed through the National Renewable Energy Laboratory (NREL), are freely available, user-friendly tools that estimate the potential economic impacts of constructing and operating power generation projects for a range of conventional and renewable energy technologies. The Transmission Line JEDI model can be used to field questions about the economic impacts of transmission lines in a given state, region, or local community. This Transmission Line JEDI User Reference Guide was developed to provide basic instruction on operating the model and understanding the results. This guide also provides information on the model's underlying methodology, as well as the parameters and references used to develop the cost data contained in the model.

Goldberg, M.; Keyser, D.

2013-10-01T23:59:59.000Z

335

2014 NERSC allocation requests due September 22  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NERSC allocation requests due September 22 2014 NERSC allocation requests due September 22 August 13, 2013 by Francesca Verdier (0 Comments) NERSC's allocation submission system is...

336

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect (OSTI)

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

337

Low Cost Heliostat Development Phase II Final Report  

SciTech Connect (OSTI)

The heliostat field in a central receiver plant makes up roughly one half of the total plant cost. As such, cost reductions for the installed heliostat price greatly impact the overall plant cost and hence the plant’s Levelized Cost of Energy. The general trend in heliostat size over the past decades has been to make them larger. One part of our thesis has been that larger and larger heliostats may drive the LCOE up instead of down due to the very nature of the precise aiming and wind-load requirements for typical heliostats. In other words, it requires more and more structure to precisely aim the sunlight at the receiver as one increases heliostat mirror area and that it becomes counter-productive, cost-wise, at some point.

Kusek, Stephen M.

2014-04-21T23:59:59.000Z

338

Hydrogen Delivery Technologies and Pipeline Transmission of Hydrogen  

E-Print Network [OSTI]

Hydrogen Delivery Technologies and Systems Pipeline Transmission of Hydrogen Strategic Initiatives, and Infrastructure Technologies Program #12;Pipeline Transmission of Hydrogen --- 2 Copyright: Design & Operation development) #12;Pipeline Transmission of Hydrogen --- 3 Copyright: Future H2 Infrastructure Wind Powered

339

Spatially and polarization resolved plasmon mediated transmission through continuous metal  

E-Print Network [OSTI]

Spatially and polarization resolved plasmon mediated transmission through continuous metal films Y transmission through an embedded undulated continuous thin metal film under normal incidence. 1D undulations resolved, polarization independent transmission. Whereas the needed submicron microstructure lends itself

Boyer, Edmond

340

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES  

E-Print Network [OSTI]

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES ANNE-SOPHIE BONNET propagation in the microstrip transmission lines used in microelectronics. In the first part, the case of the perfectly conducting strip. Key words. superconducting transmission lines, waveguides, spectral analysis

Ramdani, Karim - Institut de Mathématiques �lie Cartan, Université Henri Poincaré

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines  

E-Print Network [OSTI]

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines Martin Gander problem for multiple coupled transmission lines by a so-called transverse partitioning technique. The WR mode transmission line problems. Previous longitudinal partitioning work using the classical WR

Gander, Martin J.

342

CHARACTERIZING LOSSES IN MICROSTRIP TRANSMISSION LINES Rashmi Pathak  

E-Print Network [OSTI]

CHARACTERIZING LOSSES IN MICROSTRIP TRANSMISSION LINES by Rashmi Pathak A dissertation submitted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1 Transmission Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2 Engineering) at the UNIVERSITY OF WISCONSIN­MADISON Summer 2005 #12;i Characterizing Losses in Transmission

Timbie, Peter

343

Investigation of Multi-Frequency Power Transmission and System  

E-Print Network [OSTI]

BACKGROUND .................................................................................. 6 A. High Voltage Direct Current Transmission (HVDC) ................ 6 B. Flexible AC Transmission System (FACTS) ............................ 12... ......................................................................................................................... 80 viii LIST OF FIGURES FIGURE Page 1 Schematic of a HVDC Transmission Line...

Barazarte Conte, Ronald

2012-10-19T23:59:59.000Z

344

Advanced Fuel Cycle Cost Basis  

SciTech Connect (OSTI)

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

2008-03-01T23:59:59.000Z

345

Advanced Fuel Cycle Cost Basis  

SciTech Connect (OSTI)

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 26 cost modules—24 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert

2007-04-01T23:59:59.000Z

346

Waves Transmission and Generation in Turbine Stages in a Combustion-Noise Framework  

E-Print Network [OSTI]

, the acoustic behavior of the turbine blade rows must be known to evaluate the noise due to combustionWaves Transmission and Generation in Turbine Stages in a Combustion-Noise Framework M. Leyko SNECMA-engines could have two different origins: (a) the well-known direct combustion noise,2 which is directly

Nicoud, Franck

347

Cost Model and Cost Estimating Software - DOE Directives, Delegations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is basically a cost model, which forms the basis for estimating software. g4301-1chp22.pdf -- PDF Document, 190 KB Writer: John Makepeace Subjects: Administration...

348

An Examination of Avoided Costs in Utah  

E-Print Network [OSTI]

Subject An Examination of Avoided Costs in Utah Date Januarystate by seeking changes to the avoided cost tariff paid tomethod of calculating avoided costs that has been officially

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

349

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

Fueling stations; Cost; Shanghai; Fuel cell vehicles 1.and the delivery cost for fuel cell vehicles, however, itthus hydrogen cost therefore depend on the ?eet of fuel cell

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

350

Transmission Policy in the United States  

E-Print Network [OSTI]

Market Design (SMD) proposal. PJM’s market rules and transmission pricing, planning and investment policies are reviewed as an articulation of FERC’s RTO and SMD visions....

Joskow, Paul

2006-03-14T23:59:59.000Z

351

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

352

Load-resistant coaxial transmission line  

DOE Patents [OSTI]

A transmission line for downhole tools that make up all or part of a tool string for drilling and production of oil, gas, and geothermal wells that can withstand the dynamic gravitational forces and other accelerations associated with downhole excavations. The transmission line has a metal tube, or outer conductor, that houses a coaxial wire inner conductor. A non-metallic dielectric material is interposed between the inner and outer conductors. The outer and inner conductors and the dielectric are sufficiently compressed together so that independent motion between them is abated. Compression of the components of the transmission line may be achieved by drawing the transmission through one or more dies in order to draw down the outer conductor onto the dielectric, or by expanding the inner conductor against the dielectric using a mandrel or hydraulic pressure. Non-metallic bead segments may be used in aid of the compression necessary to resist the dynamic forces and accelerations of drilling.

Hall, David R.; Fox, Joe

2006-01-03T23:59:59.000Z

353

Transmission policy in the United States  

E-Print Network [OSTI]

This paper provides an overview of the development of electric power transmission access, pricing and investment policies in the U.S. over the last 15 years and evaluates the current state of those policies. Pre-liberalization ...

Joskow, Paul L.

2004-01-01T23:59:59.000Z

354

Data transmission element for downhole drilling components  

DOE Patents [OSTI]

A robust data transmission element for transmitting information between downhole components, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The data transmission element components include a generally U-shaped annular housing, a generally U-shaped magnetically conductive, electrically insulating element such as ferrite, and an insulated conductor. Features on the magnetically conducting, electrically insulating element and the annular housing create a pocket when assembled. The data transmission element is filled with a polymer to retain the components within the annular housing by filling the pocket with the polymer. The polymer can bond with the annular housing and the insulated conductor but preferably not the magnetically conductive, electrically insulating element. A data transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT)

2006-01-31T23:59:59.000Z

355

Transmission Issues and Power Exchanges in Texas  

E-Print Network [OSTI]

to build. This paper presents a historical background on the development of the transmission system and describes the problems of assessing the impact and properly pricing certain bulk power transactions. In addition, it briefly describes the Electro...

Hughes, H. L.

356

Electric Power Generation and Transmission (Iowa)  

Broader source: Energy.gov [DOE]

Electric power generating facilities with a combined capacity greater than 25 MW, as well as associated transmission lines, may not be constructed or begin operation prior to the issuance of a...

357

IEEE TRANSACTIONS ON POWER SYSTEMS 1 Web-based Security Cost Analysis in Electricity  

E-Print Network [OSTI]

IEEE TRANSACTIONS ON POWER SYSTEMS 1 Web-based Security Cost Analysis in Electricity Markets Hong of transmission security constraints, transactions de- termined by market forces are feasible only when they are within the system's security limits. Thus, transactions in electricity markets need to be evaluated

Cañizares, Claudio A.

358

EIS-0447: Champlain Hudson Power Express Transmission Line Project...  

Broader source: Energy.gov (indexed) [DOE]

7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the...

359

Transmission Reliability "Load as a Resource" Peer Review Materials...  

Broader source: Energy.gov (indexed) [DOE]

Transmission Reliability "Load as a Resource" Peer Review Materials Now Available Transmission Reliability "Load as a Resource" Peer Review Materials Now Available September 25,...

360

EA-1880: Big Bend to Witten Transmission Line Project, South...  

Office of Environmental Management (EM)

880: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with...

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

OAHU Wind Integration And Transmission Study: Summary Report...  

Office of Environmental Management (EM)

OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory) OAHU Wind Integration And Transmission Study: Summary Report, NREL...

362

Eastern Wind Integration and Transmission Study: Executive Summary...  

Office of Environmental Management (EM)

Eastern Wind Integration and Transmission Study: Executive Summary and Project Overview Eastern Wind Integration and Transmission Study: Executive Summary and Project Overview This...

363

Phase 2 Report: Oahu Wind Integration and Transmission Study...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba...

364

2006 National Electric Transmission Congestion Study and Related...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion...

365

Draft National Electric Transmission Congestion Study Now Available...  

Broader source: Energy.gov (indexed) [DOE]

Draft National Electric Transmission Congestion Study Now Available for Public Comment Draft National Electric Transmission Congestion Study Now Available for Public Comment August...

366

Plan to Conduct Electric Transmission Congestion Study: Federal...  

Broader source: Energy.gov (indexed) [DOE]

Plan to Conduct Electric Transmission Congestion Study: Federal Register Volume 76, No. 218 - Nov. 10, 2011 Plan to Conduct Electric Transmission Congestion Study: Federal Register...

367

In-situ Transmission Electron Microscopy and Spectroscopy Studies...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Electron Microscopy and Spectroscopy Studies of Interfaces in Li-ion Batteries: Challenges and In-situ Transmission Electron Microscopy and Spectroscopy Studies of...

368

Factsheet: An Initiative to Help Modernize Natural Gas Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Factsheet: An Initiative to Help Modernize Natural Gas Transmission and Distribution Infrastructure Factsheet: An Initiative to Help Modernize Natural Gas Transmission and...

369

QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution Meeting Date and...

370

QER Public Meeting in Portland, OR: Electricity Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Portland, OR: Electricity Transmission, Storage and Distribution - West QER Public Meeting in Portland, OR: Electricity Transmission, Storage and Distribution - West Meeting Date...

371

QER Public Meeting in Newark, NJ: Electricity Transmission and...  

Energy Savers [EERE]

Newark, NJ: Electricity Transmission and Distribution - East QER Public Meeting in Newark, NJ: Electricity Transmission and Distribution - East New Jersey Institute of Technology...

372

2012 Transmission and Energy Storage Peer Review Presentations...  

Broader source: Energy.gov (indexed) [DOE]

Transmission and Energy Storage Peer Review Presentations Available 2012 Transmission and Energy Storage Peer Review Presentations Available December 3, 2012 - 1:26pm Addthis...

373

Request for Information on Permitting of Transmission Lines:...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

374

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

375

Eastern Wind Integration and Transmission Study -- Preliminary Findings: Preprint  

SciTech Connect (OSTI)

This paper reviews the Eastern Wind Integration and Transmission Study, the development of wind datasets, the transmission analysis, and the results of wind integration analysis for four scenarios.

Corbus, D.; Milligan, M.; Ela, E.; Schuerger, M.; Zavadil, B.

2009-09-01T23:59:59.000Z

376

QER Public Meeting in New Orleans, LA: Petroleum Product Transmission...  

Energy Savers [EERE]

Orleans, LA: Petroleum Product Transmission & Distribution QER Public Meeting in New Orleans, LA: Petroleum Product Transmission & Distribution Meeting Date and Location: May 27,...

377

Dynamics of soft Nanomaterials captured by transmission electron...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Dynamics of soft Nanomaterials captured by transmission electron microscopy in liquid water. Dynamics of soft Nanomaterials captured by transmission electron microscopy in liquid...

378

DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 The purpose of...

379

An Annotated Bibliography of High-Voltage Direct-Current Transmission and Flexible AC Transmission (FACTS) Devices, 1991-1993.  

SciTech Connect (OSTI)

References are contained for HVDC systems, converter stations and components, overhead transmission lines, cable transmission, system design and operations, simulation of high voltage direct current systems, high-voltage direct current installations, and flexible AC transmission system (FACTS).

Litzenberger, Wayne; Lava, Val

1994-08-01T23:59:59.000Z

380

A Review of Recent RTO Benefit-Cost Studies: Toward MoreComprehensive Assessments of FERC Electricity RestructuringPolicies  

SciTech Connect (OSTI)

During the past three years, government and private organizations have issued more than a dozen studies of the benefits and costs of Regional Transmission Organizations (RTOs). Most of these studies have focused on benefits that can be readily estimated using traditional production-cost simulation techniques, which compare the cost of centralized dispatch under an RTO to dispatch in the absence of an RTO, and on costs associated with RTO start-up and operation. Taken as a whole, it is difficult to draw definitive conclusions from these studies because they have not examined potentially much larger benefits (and costs) resulting from the impacts of RTOs on reliability management, generation and transmission investment and operation, and wholesale electricity market operation. This report: (1) Describes the history of benefit-cost analysis of FERC electricity restructuring policies; (2)Reviews current practice by analyzing 11 RTO benefit-cost studies that were published between 2002 and 2004 and makes recommendations to improve the documentation of data and methods and the presentation of findings in future studies that focus primarily on estimating short-run economic impacts; and (3) Reviews important impacts of FERC policies that have been overlooked or incompletely treated by recent RTO benefit-cost studies and the challenges to crafting more comprehensive assessments of these impacts based on actual performance, including impacts on reliability management, generation and transmission investment and operation, and wholesale electricity market operation.

Eto, Joseph H.; Lesieutre, Bernard C.

2005-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Abstract --The need to determine adequate regulations in the transmission activity in deregulated environments does not  

E-Print Network [OSTI]

be followed. Index Terms--Transmission expansion, Transmission planning, Transmission systems, Transmission pricing, Open access. I INTRODUCTION he presence of economies of scale and the specificity

Dixon, Juan

382

Lower Cost Carbon Fiber Precursors  

Broader source: Energy.gov (indexed) [DOE]

production and conversion parameters must be optimized. Lower cost fiber enable CF composite applications. Approach: 1. Complete previous effort by scaling to the CF production...

383

Lower Cost Carbon Fiber Precursors  

Broader source: Energy.gov (indexed) [DOE]

performing fiber. (600-750 KSI) Barriers: Addresses the need for higher performance low cost fiber for hydrogen storage tanks and energy management structures of automobiles....

384

HTGR Cost Model Users' Manual  

SciTech Connect (OSTI)

The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

A.M. Gandrik

2012-01-01T23:59:59.000Z

385

Audit Costs for the 1986 Texas Energy Cost Containment Program  

E-Print Network [OSTI]

Direct program costs for detailed audits of 13.5 million square feet of institutional building space in the 1986 Texas Energy Cost Containment Program were $0.047/SF. The building area was 63 percent simple (offices, schools, and universities...

Heffington, W. M.; Lum, S. K.; Bauer, V. A.; Turner, W. D.

1987-01-01T23:59:59.000Z

386

Hydrogen Compression, Storage, and Dispensing Cost Reduction...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Compression, Storage, and Dispensing Cost Reduction Workshop Addendum Hydrogen Compression, Storage, and Dispensing Cost Reduction Workshop Addendum Document states additional...

387

5, 14791509, 2008 Staged cost  

E-Print Network [OSTI]

HESSD 5, 1479­1509, 2008 Staged cost optimization of urban storm drainage systems M. Maharjan et al Staged cost optimization of urban storm drainage systems based on hydraulic performance in a changing optimization of urban storm drainage systems M. Maharjan et al. Title Page Abstract Introduction Conclusions

Boyer, Edmond

388

Reactor Cost Analysis Brian James  

E-Print Network [OSTI]

Reactor Cost Analysis Brian James Directed Technologies, Inc. 6-7 November 2007 This presentation specification & optimization · Capital cost estimation · Projected hydrogen $/kg #12;Directed Technologies, Inc/WGS Membrane Reactor OTM/ Water-Splitting ANL With WGS #12;Directed Technologies, Inc. 6-7 November 2007 BILIWG

389

Use of Cost Estimating Relationships  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Cost Estimating Relationships (CERs) are an important tool in an estimator's kit, and in many cases, they are the only tool. Thus, it is important to understand their limitations and characteristics. This chapter discusses considerations of which the estimator must be aware so the Cost Estimating Relationships can be properly used.

1997-03-28T23:59:59.000Z

390

Sandia National Laboratories: Transmission Grid Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Generator Modeling Radar Friendly Blades Special Programs Techno-Economic Modeling, Analysis, and Support Analysis, Modeling, Cost of Energy, and Policy Impact: Wind Vision 2014...

391

Radiative Thermal Noise for Transmissive Optics in Gravitational-Wave Detectors  

E-Print Network [OSTI]

Radiative losses have traditionally been neglected in the calculation of thermal noise of transmissive optical elements because for the most commonly used geometries they are small compared to losses due to thermal conduction. We explore the use of such transmissive optical elements in extremely noise-sensitive environments such as the arm cavities of future gravitational-wave interferometers. This drives us to a geometry regime where radiative losses are no longer negligible. In this paper we derive the thermo-refractive noise associated with such radiative losses and compare it to other known sources of thermal noise.

Sheila Dwyer; Stefan W. Ballmer

2014-08-07T23:59:59.000Z

392

Hydraulic system for a ratio change transmission  

DOE Patents [OSTI]

Disclosed is a drive assembly (10) for an electrically powered vehicle (12). The assembly includes a transaxle (16) having a two-speed transmission (40) and a drive axle differential (46) disposed in a unitary housing assembly (38), an oil-cooled prime mover or electric motor (14) for driving the transmission input shaft (42), an adapter assembly (24) for supporting the prime mover on the transaxle housing assembly, and a hydraulic system (172) providing pressurized oil flow for cooling and lubricating the electric motor and transaxle and for operating a clutch (84) and a brake (86) in the transmission to shift between the two-speed ratios of the transmission. The adapter assembly allows the prime mover to be supported in several positions on the transaxle housing. The brake is spring-applied and locks the transmission in its low-speed ratio should the hydraulic system fail. The hydraulic system pump is driven by an electric motor (212) independent of the prime mover and transaxle.

Kalns, Ilmars (Northville, MI)

1981-01-01T23:59:59.000Z

393

The inherent inefficiency of simultaneously feasible financial transmission rights auctions  

E-Print Network [OSTI]

Electricity auction Simultaneous feasibility Transmission pricing Empirical evidence from the New York ISO

Oren, Shmuel S.

394

Questions and Issues on Hydrogen Pipeline Transmission of Hydrogen  

E-Print Network [OSTI]

Questions and Issues on Hydrogen Pipelines Pipeline Transmission of Hydrogen Doe Hydrogen Pipeline Working Group Meeting August 31, 2005 #12;Pipeline Transmission of Hydrogen --- 2 Copyright: Air Liquide Transmission of Hydrogen --- 3 Copyright: #12;Pipeline Transmission of Hydrogen --- 4 Copyright: 3. Special

395

Downhole transmission system comprising a coaxial capacitor  

DOE Patents [OSTI]

A transmission system in a downhole component comprises a plurality of data transmission elements. A coaxial cable having an inner conductor and an outer conductor is disposed within a passage in the downhole component such that at least one capacitor is disposed in the passage and having a first terminal coupled to the inner conductor and a second terminal coupled to the outer conductor. Preferably the transmission element comprises an electrically conducting coil. Preferably, within the passage a connector is adapted to electrically connect the inner conductor of the coaxial cable and the lead wire. The coaxial capacitor may be disposed between and in electrically communication with the connector and the passage. In another embodiment a connector is adapted to electrical connect a first and a second portion of the inner conductor of the coaxial cable and a coaxial capacitor is in electrical communication with the connector and the passage.

Hall, David R. (Provo, UT); Pixton, David S. (Lehi, UT); Johnson, Monte L. (Orem, UT); Bartholomew, David B. (Springville, UT); Hall, Jr., H. Tracy (Provo, UT); Rawle, Michael (Springville, UT)

2011-05-24T23:59:59.000Z

396

Reducing biosolids disposal costs using land application in forested areas  

SciTech Connect (OSTI)

Switching biosolids land application from a reclamation site to a forested site significantly reduced the cost of biosolids disposal at the Savannah River Site. Previous beneficial reuse programs focused on reclamation of existing borrow pits. While extremely beneficial, this program became very costly due to the regulatory requirements for groundwater monitoring, soil monitoring and frequent biosolids analyses. A new program was developed to reuse biosolids in forested areas where the biosolids could be used as a soil conditioner and fertilizer to enhance timber yield. The forested land application site was designed so that groundwater monitoring and soil monitoring could be eliminated while biosolids monitoring and site maintenance were minimized. Monitoring costs alone were reduced by 80%. Capital costs for site preparation were also significantly reduced since there was no longer a need for expensive groundwater monitoring wells.

Huffines, R.L.

1995-11-01T23:59:59.000Z

397

Emissions Scenarios, Costs, and Implementation Considerations of REDD Programs  

SciTech Connect (OSTI)

Greenhouse gas emissions from the forestry sector are estimated to be 8.4 GtCO2-eq./year or about 17percent of the global emissions. We estimate that the cost forreducing deforestation is low in Africa and several times higher in Latin America and Southeast Asia. These cost estimates are sensitive to the uncertainties of how muchunsustainable high-revenue logging occurs, little understood transaction and program implementation costs, and barriers to implementation including governance issues. Due to lack of capacity in the affected countries, achieving reduction or avoidance of carbon emissions will require extensive REDD-plus programs. Preliminary REDD-plus Readiness cost estimates and program descriptions for Indonesia, Democratic Republic of the Congo, Ghana, Guyana and Mexico show that roughly one-third of potential REDD-plus mitigation benefits might come from avoided deforestation and the rest from avoided forest degradation and other REDD-plus activities.

Sathaye, Jayant; Andrasko, Ken; Chan, Peter

2011-04-11T23:59:59.000Z

398

Performance and economic comparison between point-to-point HVDC transmission and hybrid back-to-back HVDC/AC transmissions  

SciTech Connect (OSTI)

Two alternative schemes to interconnect asynchronous or independent ac systems by a limited capacity link are presented. The first alternative is a conventional point-to-point HVDC transmission system; the second alternative comprises an ac line terminated by an HVDC back- to-back link. Technical and operational properties of both schemes are illustrated with emphasis on var regulation capability and control flexibility to improve the overall performance of the interconnected ac systems. Cost comparisons for the principal components of the two alternatives are made. A brief description of two existing HVDC installations is given to demonstrate the practical implementation of the considered schemes.

Hammad, A.E. (ABB, Asea Brown Boveri Ltd., Baden (CH)); Long, W.F. (Wisconsin Univ., Madison, WI (USA))

1990-04-01T23:59:59.000Z

399

Incentive Rates- At What Cost?  

E-Print Network [OSTI]

with interruptible services. Instead, I filed "ISB" which was priced slightly above the marginal fuel cost on a time of use basis. Many of the periods of the year the first year that I proposed that rate, the cost of interruptible would have been higher than... forms centers on four issues; cost scope of the topic, so let me describe what I feel based pricing, discrimination, competition between is an incentive rate. My view is likely to strike utilities, and effectiveness. You've already some of you...

Schaeffer, S. C.

400

Sandia National Laboratories: Water Availability, Cost, and Use  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

InterconnectsWater Availability, Cost, and Use Water Availability, Cost, and Use Water Availability, Cost, and Use Water Availability, Cost, and Use Availability, cost, and...

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Advanced Computational Methods for Security Constrained Financial Transmission Rights  

SciTech Connect (OSTI)

Financial Transmission Rights (FTRs) are financial insurance tools to help power market participants reduce price risks associated with transmission congestion. FTRs are issued based on a process of solving a constrained optimization problem with the objective to maximize the FTR social welfare under power flow security constraints. Security constraints for different FTR categories (monthly, seasonal or annual) are usually coupled and the number of constraints increases exponentially with the number of categories. Commercial software for FTR calculation can only provide limited categories of FTRs due to the inherent computational challenges mentioned above. In this paper, first an innovative mathematical reformulation of the FTR problem is presented which dramatically improves the computational efficiency of optimization problem. After having re-formulated the problem, a novel non-linear dynamic system (NDS) approach is proposed to solve the optimization problem. The new formulation and performance of the NDS solver is benchmarked against widely used linear programming (LP) solvers like CPLEX™ and tested on both standard IEEE test systems and large-scale systems using data from the Western Electricity Coordinating Council (WECC). The performance of the NDS is demonstrated to be comparable and in some cases is shown to outperform the widely used CPLEX algorithms. The proposed formulation and NDS based solver is also easily parallelizable enabling further computational improvement.

Kalsi, Karanjit; Elbert, Stephen T.; Vlachopoulou, Maria; Zhou, Ning; Huang, Zhenyu

2012-07-26T23:59:59.000Z

402

Postmortem Cost and Schedule Analysis - Lessons Learned On NCSX  

SciTech Connect (OSTI)

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative fusion energy confinement device developed by the Princeton Plasma Physics Laboratory (PPPL) and Oak Ridge National Laboratory (ORNL) under contract from the US Department of Energy. The project was technically very challenging, primarily due to the complex component geometries and tight tolerances that were required. As the project matured these challenges manifested themselves in significant cost overruns through all phases of the project (i.e. design, R&D, fabrication and assembly). The project was subsequently cancelled by the DOE in 2008. Although the project was not completed, several major work packages, comprising about 65% of the total estimated cost (excluding management and contingency), were completed, providing a data base of actual costs that can be analyzed to understand cost drivers. Technical factors that drove costs included the complex geometry, tight tolerances, material requirements, and performance requirements. Management factors included imposed annual funding constraints that throttled project cash flow, staff availability, and inadequate R&D. Understanding how requirements and design decisions drove cost through this top-down forensic cost analysis could provide valuable insight into the configuration and design of future state-of-the art machines and other devices.

R. Strykowsky, T. Brown, J. Chrzanowski, M. Cole, P. Heitzenroeder, G.H. Neilson, Donald Rej, and M. Viola

2012-03-08T23:59:59.000Z

403

A study of design oriented cost estimation  

E-Print Network [OSTI]

except for the cost of material, and does not distinguish direct and indirect costs involved in the production. Vernon (1968) describes costs as standard or actual. Standard cost is a predicted cost reflecting what a part or product should cost, while... parts only. Some researchers have used the component cost in making decisions regarding the manufacturing process. Egbelu and others (Egbelu et al. , 1982) describe a model for making decisions about cast parts. They define a relationship associating...

Raman, Ramchand P.

1992-01-01T23:59:59.000Z

404

Transmission grid access and pricing in Norway, Spain, and California: A comparative study  

E-Print Network [OSTI]

incentives given by transmission pricing form the foundationhas focussed on transmission pricing, monopoly regulation,

Gronli, Helle; Gomez San Ramon, Tomas; Marnay, Chris

1999-01-01T23:59:59.000Z

405

Radio-Frequency Interference (RFI) From Extra-High-Voltage (EHV) Transmission Lines  

E-Print Network [OSTI]

-current (HVAC) transmission lines; high-voltage direct-current (HVDC) transmission lines will be addressed

Ellingson, Steven W.

406

Broadband asymmetric acoustic transmission by a plate with quasi-periodic surface ridges  

SciTech Connect (OSTI)

In this paper, an acoustic system with broadband asymmetric transmission is designed and fabricated, which consists of a water-immersed aluminum plate engraved with quasi-periodically-patterned ridges on single surface. It demonstrates that when the acoustic waves are launched into the system from the structured side, they can couple into the Lamb modes in the plate efficiently and attain a high transmission; on the contrary, when the waves are incident from the opposite flat side, the coupling is weak, and the transmission is low. Superior to systems with periodic patterning, this quasi-periodically-patterned system has a broad working frequency range due to the collective contributions from the multiple diffractions specific to the structure.

Li, Chunhui; Ke, Manzhu, E-mail: mzke@whu.edu.cn; Ye, Yangtao; Xu, Shengjun; Qiu, Chunyin; Liu, Zhengyou [Key Laboratory of Artificial Micro- and Nano-structures of Ministry of Education and School of Physics and Technology, Wuhan University, Wuhan 430072 (China)

2014-07-14T23:59:59.000Z

407

Mandatory Photovoltaic System Cost Estimate  

Broader source: Energy.gov [DOE]

At the request of a customer or a potential customer, Colorado electric utilities are required to conduct a cost comparison of a photovoltaic (PV) system to any proposed distribution line extension...

408

Lower Cost Carbon Fiber Precursors  

Broader source: Energy.gov (indexed) [DOE]

1 Lower Cost Carbon Fiber Precursors P.I. Name: Dave Warren Presenter: Dr. Amit K. Naskar Oak Ridge National Laboratory 05162012 Project ID LM004 This presentation does not...

409

Decision-Support Software for Grid Operators: Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation  

SciTech Connect (OSTI)

GENI Project: The CRA team is developing control technology to help grid operators more actively manage power flows and integrate renewables by optimally turning on and off entire power lines in coordination with traditional control of generation and load resources. The control technology being developed would provide grid operators with tools to help manage transmission congestion by identifying the facilities whose on/off status must change to lower generation costs, increase utilization of renewable resources and improve system reliability. The technology is based on fast optimization algorithms for the near to real-time change in the on/off status of transmission facilities and their software implementation.

None

2012-03-16T23:59:59.000Z

410

Assessment of costs and benefits of flexible and alternative fuel use in the US transportation sector  

SciTech Connect (OSTI)

The primary objective of this report is to provide estimates of volumes and development costs of known nonassociated gas reserves in selected, potentially important supplier nations, using a standard set of costing algorithms and conventions. Estimates of undeveloped nonassociated gas reserves and the cost of drilling development wells, production equipment, gas processing facilities, and pipeline construction are made at the individual field level. A discounted cash-flow model of production, investment, and expenses is used to estimate the present value cost of developing each field on a per-thousand-cubic-foot (Mcf) basis. These gas resource cost estimates for individual accumulations (that is, fields or groups of fields) then were aggregated into country-specific price-quantity curves. These curves represent the cost of developing and transporting natural gas to an export point suitable for tanker shipments or to a junction with a transmission line. The additional costs of LNG or methanol conversion are not included. A brief summary of the cost of conversion to methanol and transportation to the United States is contained in Appendix D: Implications of Gas Development Costs for Methanol Conversion.

none,

1993-01-01T23:59:59.000Z

411

Marketing Plan for Transmission Planning Services  

E-Print Network [OSTI]

well because of its people, business market and industry; it is always a good idea to be on the lookout for new markets and clients in other industries and markets. Transmission planning has always been a steady market for the electrical industry...

Tu, Linh

2006-12-15T23:59:59.000Z

412

A neutron transmission study of environmental Gd  

E-Print Network [OSTI]

A new method for the determination of environmental Gd by neutron transmission (NT) experiments is proposed. The NT method is based on the measurements of neutron spectra passing through a target. From the attenuation neutron spectra new data as concentration, width, resonance energies and cross section have been obtained.

Cristiana Oprea; Ioan Alexandru Oprea; Alexandru Mihul

2014-06-02T23:59:59.000Z

413

Transmission line environmental assessment guidance document  

SciTech Connect (OSTI)

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

414

Extraordinary acoustic transmission mediated by Helmholtz resonators  

SciTech Connect (OSTI)

We demonstrate perfect transmission of sound through a rigid barrier embedded with Helmholtz resonators. The resonators are confined within a waveguide and they are oriented such that one neck protrudes onto each side of the barrier. Perfect sound transmission occurs even though the open area of the necks is less than 3% of the barrier area. Maximum transmission occurs at the resonant frequency of the Helmholtz resonator. Because the dimensions of the Helmholtz resonators are much smaller than the resonant wavelength, the transmission is independent of the direction of sound on the barrier and of the relative placement of the necks. Further, we show that the transmitted sound experiences a continuous phase transition of ? radians as a function of frequency through resonance. In simulations of adjacent resonators with slightly offset resonance frequencies, the phase difference leads to destructive interference. By expanding the simulation to a linear array of tuned Helmholtz resonators we show that it is possible to create an acoustic lens. The ability of Helmholtz resonator arrays to manipulate the phase of a plane acoustic wave enables a new class of sonic beam-forming devices analogous to diffractive optics.

Koju, Vijay [Computation Science Program, Middle Tennessee State University, Murfreesboro, Tennessee 37132 (United States); Rowe, Ebony [Department of Physics and Astronomy, Middle Tennessee State University, Murfreesboro, Tennessee 37132 (United States); Robertson, William M., E-mail: William.Robertson@mtsu.edu [Computation Science Program, Middle Tennessee State University, Murfreesboro, Tennessee 37132 (United States); Department of Physics and Astronomy, Middle Tennessee State University, Murfreesboro, Tennessee 37132 (United States)

2014-07-15T23:59:59.000Z

415

HVDC transmission: a path to the future?  

SciTech Connect (OSTI)

Direct current transmission has been the poor stepchild of the U.S. electric industry. Although early-generation plants were based on DC technology, it was soon deemed uneconomical to transmit electricity over long distances, but it now appears poised for a change. Both the increasing technical potential and changing economics of HVDC lines promise a growing role in the future. (author)

Teichler, Stephen L.; Levitine, Ilia

2010-05-15T23:59:59.000Z

416

Transmission Rights and Market Power James Bushnell  

E-Print Network [OSTI]

wholesale electricity markets, and their associated Independent System Operators (ISOs), now formingPWP-062 Transmission Rights and Market Power James Bushnell April, 1999 This paper is part of the working papers series of the Program on Workable Energy Regulation (POWER). POWER is a program

California at Berkeley. University of

417

TRANSMISSION OPEN ACCESS IN CHILE Hugh Rudnick  

E-Print Network [OSTI]

increasing attention by power utilities and regulatory state bodies worldwide [1]. Many countries have Policy Group, John F. Kennedy School of Government, Cambridge, Massachusetts, October 27-28th, 1994 and consumers. The system is to be paid by all users (included the user actually owning the transmission network

Catholic University of Chile (Universidad Católica de Chile)

418

Methods and systems for micro transmissions  

DOE Patents [OSTI]

Methods and systems for micro transmissions for a micro machine may comprise an input shaft assembly coupled to a micro actuator, an output shaft assembly coupled to a micro shaft, and one or more power conversion elements operable to convert a first type of movement from the micro actuator into a second, disparate type of movement for the micro shaft.

Stalford, Harold L

2014-12-23T23:59:59.000Z

419

Bordereau de transmission accident du travail  

E-Print Network [OSTI]

Bordereau de transmission accident du travail Service des pensions et accidents du travail accidents du travail du CNRS Accompagné des pièces requises Nom .................................................... Prénom ........................ Matricule ...... Composition du dossier Observations Déclaration d'accident

Pouyanne, Nicolas

420

Efficient Spectral Methods for Transmission Eigenvalues and ...  

E-Print Network [OSTI]

Mar 20, 2014 ... Recently a new method using transmission eigen- values to estimate the index of ..... eigenvalue µ(D) coincides with the value k1(D,n) obtained from the far field data: AlgorithmN n0 ..... H1 semi-norm by u 2 ? =? 1. ?1 u2 ?dt ...

2014-03-24T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Letting The Sun Shine On Solar Costs: An Empirical Investigation Of Photovoltaic Cost Trends In California  

E-Print Network [OSTI]

INVESTIGATION OF PHOTOVOLTAIC COST TRENDS IN CALIFORNIA RyanInvestigation of Photovoltaic Cost Trends in California”,cost of customer-sited, grid-connected solar photovoltaic (

Wiser, Ryan; Bolinger, Mark; Cappers, Peter; Margolis, Robert

2006-01-01T23:59:59.000Z

422

COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY  

E-Print Network [OSTI]

and simple cycle costs are the result of a comprehensive survey of actual costs from the power plant developers in California who built power plants between 2001 and 2006. The other costs are based on actual in conjunction with the variable cost information of a production cost market simulation model to produce

423

Sponsored Project Account Cost Transfer Explanation  

E-Print Network [OSTI]

Sponsored Project Account Cost Transfer Explanation Check-Off List December 2011 The explanations checked below best describe the reasons for why the cost transfers are being made. Costs as to how to allocate the cost, temporarily assigned the cost to an existing account that acted

He, Chuan

424

Conservation Cost-Effectiveness Determination Methodology  

E-Print Network [OSTI]

the levelized cost of the aggregate supply curves, the portfolio model does not evaluate each measure's specific of programming constraints, the levelized costs of conservation used in the portfolio model are not adjusted of its costs. May 2005 E-1 #12;include energy and capacity cost savings, local distribution cost savings

425

Study of transmission line attenuation in broad band millimeter wave frequency range  

SciTech Connect (OSTI)

Broad band millimeter wave transmission lines are used in fusion plasma diagnostics such as electron cyclotron emission (ECE), electron cyclotron absorption, reflectometry and interferometry systems. In particular, the ECE diagnostic for ITER will require efficient transmission over an ultra wide band, 100 to 1000 GHz. A circular corrugated waveguide transmission line is a prospective candidate to transmit such wide band with low attenuation. To evaluate this system, experiments of transmission line attenuation were performed and compared with theoretical loss calculations. A millimeter wave Michelson interferometer and a liquid nitrogen black body source are used to perform all the experiments. Atmospheric water vapor lines and continuum absorption within this band are reported. Ohmic attenuation in corrugated waveguide is very low; however, there is Bragg scattering and higher order mode conversion that can cause significant attenuation in this transmission line. The attenuation due to miter bends, gaps, joints, and curvature are estimated. The measured attenuation of 15 m length with seven miter bends and eighteen joints is 1 dB at low frequency (300 GHz) and 10 dB at high frequency (900 GHz), respectively.

Pandya, Hitesh Kumar B. [ITER-India, IPR, Gandhinagar, Gujarat (India)] [ITER-India, IPR, Gandhinagar, Gujarat (India); Austin, M. E. [Institute for Fusion Studies, the University of Texas at Austin, Austin, Texas (United States)] [Institute for Fusion Studies, the University of Texas at Austin, Austin, Texas (United States); Ellis, R. F. [Laboratory for Plasma and Fusion Energy Studies, University of Maryland, College Park, Maryland 20742 (United States)] [Laboratory for Plasma and Fusion Energy Studies, University of Maryland, College Park, Maryland 20742 (United States)

2013-10-15T23:59:59.000Z

426

NUCLEAR ENERGY SYSTEM COST MODELING  

SciTech Connect (OSTI)

The U.S. Department of Energy’s Fuel Cycle Technologies (FCT) Program is preparing to perform an evaluation of the full range of possible Nuclear Energy Systems (NES) in 2013. These include all practical combinations of fuels and transmuters (reactors and sub-critical systems) in single and multi-tier combinations of burners and breeders with no, partial, and full recycle. As part of this evaluation, Levelized Cost of Electricity at Equilibrium (LCAE) ranges for each representative system will be calculated. To facilitate the cost analyses, the 2009 Advanced Fuel Cycle Cost Basis Report is being amended to provide up-to-date cost data for each step in the fuel cycle, and a new analysis tool, NE-COST, has been developed. This paper explains the innovative “Island” approach used by NE-COST to streamline and simplify the economic analysis effort and provides examples of LCAE costs generated. The Island approach treats each transmuter (or target burner) and the associated fuel cycle facilities as a separate analysis module, allowing reuse of modules that appear frequently in the NES options list. For example, a number of options to be screened will include a once-through uranium oxide (UOX) fueled light water reactor (LWR). The UOX LWR may be standalone, or may be the first stage in a multi-stage system. Using the Island approach, the UOX LWR only needs to be modeled once and the module can then be reused on subsequent fuel cycles. NE-COST models the unit operations and life cycle costs associated with each step of the fuel cycle on each island. This includes three front-end options for supplying feedstock to fuel fabrication (mining/enrichment, reprocessing of used fuel from another island, and/or reprocessing of this island’s used fuel), along with the transmuter and back-end storage/disposal. Results of each island are combined based on the fractional energy generated by each islands in an equilibrium system. The cost analyses use the probability distributions of key parameters and employs Monte Carlo sampling to arrive at an island’s cost probability density function (PDF). When comparing two NES to determine delta cost, strongly correlated parameters can be cancelled out so that only the differences in the systems contribute to the relative cost PDFs. For example, one comparative analysis presented in the paper is a single stage LWR-UOX system versus a two-stage LWR-UOX to LWR-MOX system. In this case, the first stage of both systems is the same (but with different fractional energy generation), while the second stage of the UOX to MOX system uses the same type transmuter but the fuel type and feedstock sources are different. In this case, the cost difference between systems is driven by only the fuel cycle differences of the MOX stage.

Francesco Ganda; Brent Dixon

2012-09-01T23:59:59.000Z

427

The cost of noise reduction for departure and arrival operations of commercial tilt rotor aircraft  

E-Print Network [OSTI]

The relationship between direct operating cost (DOC) and noise annoyance due to a departure and an arrival operation was developed for commercial tilt rotor aircraft. This was accomplished by generating a series of tilt ...

Faulkner, Henry B.

1976-01-01T23:59:59.000Z

428

Cost-benefit analysis of aircraft design for environment using a fleet perspective and real options  

E-Print Network [OSTI]

Traditional multidisciplinary design optimization (MDO) approaches do not examine the costs associated with damage due to environmental factors and are usually implemented to examine one aircraft. The Environmental Design ...

Hynes, Christopher Dennis

2005-01-01T23:59:59.000Z

429

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York)  

Broader source: Energy.gov [DOE]

Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and...

430

RaisingRivals'FixedCosts Matthew Olczak  

E-Print Network [OSTI]

. In addition much of the recent Industrial Organisation literature has focused on the importance of sunk costs, whereas this paper considers fixed costs that do not have to be sunk costs. A set of guidelines produced

Feigon, Brooke

431

USA oilgas production cost : recent changes  

E-Print Network [OSTI]

During 1984-1989, oil development investment cost in the USA fell, but only because of lower activity. The whole cost curve shifted unfavorably (leftward). In contrast, natural gas cost substantially decreased, the curve ...

Adelman, Morris Albert

1991-01-01T23:59:59.000Z

432

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network [OSTI]

and the delivery cost for fuel cell vehicles, however, itfueling stations, cost, Shanghai, fuel cell vehicles 1.0hydrogen cost therefore depend on the fleet of fuel cell

Weinert, Jonathan X.; Shaojun, Liu; Ogden, J; Jianxin, Ma

2006-01-01T23:59:59.000Z

433

Designing for cost In an aerospace company  

E-Print Network [OSTI]

Companies take different approaches, and achieve different degrees of implementation, in designing products for cost. This thesis discusses Target Costing and its application at The Boeing Company. Target Costing is a ...

Hammar, Elizabeth (Elizabeth Deming)

2014-01-01T23:59:59.000Z

434

Plant Energy Cost Optimization Program (PECOP)  

E-Print Network [OSTI]

The Plant Energy Cost Optimization Program (PECOP) is a Management System designed to reduce operating cost in a continuous operating multi product plant by reviewing all cost factors and selecting plant wide production schedules which are most...

Robinson, A. M.

1980-01-01T23:59:59.000Z

435

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network [OSTI]

to hydrogen storage vessels and compressors. Feedstock CostHydrogen Production Equipment Purifier Storage System Compressor Dispenser Additional Equipment Installation Costshydrogen equipment costs. Meyers [2] provides an in depth analyses of reformer, compressor, and storage equipment costs.

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2006-01-01T23:59:59.000Z

436

Great Plains Wind Energy Transmission Development Project  

SciTech Connect (OSTI)

In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

2012-06-09T23:59:59.000Z

437

 Underfloor air distribution (UFAD) cost study: analysis of first cost tradeoffs in UFAD systems  

E-Print Network [OSTI]

Thermal Quality: Total HVAC Cost Trend Table 5. Wall Thermal20. Climate: Total HVAC Cost Trend HVAC Category Cost ($/the total perimeter HVAC cost trend for increased density of

Webster, Tom; Benedek, Corinne; Bauman, Fred

2006-01-01T23:59:59.000Z

438

Task force reduces stuck-pipe costs  

SciTech Connect (OSTI)

A task-force approach to stuck pipe has produced more than a 70% reduction in BP Exploration Operating Co.'s worldwide stuck-pipe costs during 1989 and 1990. We believe that these results have been primarily due to focusing our attention on improving personnel performance rather than to the introduction of new technology. Key elements in this paper of the efforts involved: Recognizing the importance of the drilling contractor and the service company staff's role in helping control stuck pipe; Promoting a rig-team approach to tackling the problem; Providing training on rig-team, stuck-pipe problem solving; and raising awareness of stuck pipe through a coordinated worldwide communications program among BP, contractors, and service companies.

Bradley, W.B. (BP Research, Houston, TX (US)); Jarman, D. (BP Exploration Operation Co., Aberdeen (GB)); Auflick, R.A.; Plott, R.S. (BP Exploration Operating Co., Houston, TX (US)); Wood, R.D. (BP Exploration Operating Co., London (GB)); Schofield, T.R. (BP Exploration Operating Co., Beijing (CN)); Cocking, D. (BP Exploration Operating Co., Ho Chi Minh City (CN))

1991-05-27T23:59:59.000Z

439

Cost Analysis of Hydrogen Storage Systems  

Broader source: Energy.gov (indexed) [DOE]

Results - Do Not Cite Hydrogen Storage Sodium Alanate Bottom-up BOP Cost DFMA software is used to estimate balance of plant (BOP) component costs based on material,...

440

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

pieces of hardware: 1. Hydrogen production equipment (e.g.when evaluating hydrogen production costs. Many analyses inrespect to size and hydrogen production method. These costs

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Driltac (Drilling Time and Cost Evaluation)  

SciTech Connect (OSTI)

The users manual for the drill tech model for estimating the costs of geothermal wells. The report indicates lots of technical and cost detail. [DJE-2005

None

1986-08-01T23:59:59.000Z

442

Estimating Specialty Costs - DOE Directives, Delegations, and...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

project specialty costs and methods of estimating costs for specialty projects. g4301-1chp20.pdf -- PDF Document, 56 KB Writer: John Makepeace Subjects: Administration Management...

443

Example Cost Codes for Construction Projects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides an example outline of cost items and their corresponding cost codes that may be used for construction projects.

1997-03-28T23:59:59.000Z

444

Hydrogen Production Cost Estimate Using Biomass Gasification...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Production Cost Estimate Using Biomass Gasification: Independent Review Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review This independent review is...

445

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling  

E-Print Network [OSTI]

to bond with composite matrix material. It is important that a carbon fiber manufacturing cost model manufactured with carbon fiber as opposed to traditional materials such as steel, automotive parts are able associated with both the manufacture of carbon fibers themselves as well as their composites. Traditional

446

Cost-Causation and Integration Cost Analysis for Variable Generation  

SciTech Connect (OSTI)

This report examines how wind and solar integration studies have evolved, what analysis techniques work, what common mistakes are still made, what improvements are likely to be made in the near future, and why calculating integration costs is such a difficult problem and should be undertaken carefully, if at all.

Milligan, M.; Ela, E.; Hodge, B. M.; Kirby, B.; Lew, D.; Clark, C.; DeCesaro, J.; Lynn, K.

2011-06-01T23:59:59.000Z

447

Dispersion-free radial transmission lines  

DOE Patents [OSTI]

A dispersion-free radial transmission line ("DFRTL") preferably for linear accelerators, having two plane conductors each with a central hole, and an electromagnetically permeable material ("EPM") between the two conductors and surrounding a channel connecting the two holes. At least one of the material parameters of relative magnetic permeability, relative dielectric permittivity, and axial width of the EPM is varied as a function of radius, so that the characteristic impedance of the DFRTL is held substantially constant, and pulse transmission therethrough is substantially dispersion-free. Preferably, the EPM is divided into concentric radial sections, with the varied material parameters held constant in each respective section but stepwise varied between sections as a step function of the radius. The radial widths of the concentric sections are selected so that pulse traversal time across each section is the same, and the varied material parameters of the concentric sections are selected to minimize traversal error.

Caporaso, George J. (Livermore, CA); Nelson, Scott D. (Patterson, CA)

2011-04-12T23:59:59.000Z

448

127 Natural Gas Transmission and Distribution Module  

E-Print Network [OSTI]

and border prices, end-use prices, and flows of natural gas through a regional interstate representative pipeline network, for both a peak (December through March) and off-peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of the supply options available to bring gas to market centers within each of the NGTDM regions (Figure 9). The major assumptions used within the NGTDM are grouped into four general categories. They relate to (1) structural components of the model, (2) capacity expansion and pricing of transmission and distribution services, (3) Arctic pipelines, and (4) imports and exports. A complete listing of NGTDM assumptions and in-depth

Key Assumptions

449

Acoustic data transmission through a drillstring  

DOE Patents [OSTI]

A method and apparatus for acoustically transmitting data along a drillstring is presented. In accordance with one embodiment of the present invention, acoustic data signals are conditioned to counteract distortions caused by the drillstring. Preferably, this conditioning step comprises multiplying each frequency component of the data signal by exp (-ikL) where L is the transmission length of the drillstring, k is the wave number in the drillstring at the frequency of each component and i is (-1).sup.1/2. In another embodiment of this invention, data signals having a frequency content in at least one passband of the drillstring are generated preferably traveling in only one direction (e.g., up the drillstring) while echoes in the drillstring resulting from the data transmission are suppressed.

Drumheller, Douglas S. (Cedar Crest, NM)

1992-01-01T23:59:59.000Z

450

Acoustic data transmission through a drillstring  

DOE Patents [OSTI]

A method and apparatus for acoustically transmitting data along a drillstring are presented. In accordance with one embodiment of the present invention, acoustic data signals are conditioned to counteract distortions caused by the drillstring. Preferably, this conditioning step comprises multiplying each frequency component of the data signal by exp ([minus]ikL) where L is the transmission length of the drillstring, k is the wave number in the drillstring at the frequency of each component and i is ([minus]1)[sup 1/2]. In another embodiment of this invention, data signals having a frequency content in at least one passband of the drillstring are generated preferably traveling in only one direction (e.g., up the drillstring) while echoes in the drillstring resulting from the data transmission are suppressed. 20 figs.

Drumheller, D.S.

1992-07-07T23:59:59.000Z

451

Retail Infrastructure Costs Comparison for Hydrogen and Electricity for Light-Duty Vehicles: Preprint  

SciTech Connect (OSTI)

Both hydrogen and plug-in electric vehicles offer significant social benefits to enhance energy security and reduce criteria and greenhouse gas emissions from the transportation sector. However, the rollout of electric vehicle supply equipment (EVSE) and hydrogen retail stations (HRS) requires substantial investments with high risks due to many uncertainties. We compare retail infrastructure costs on a common basis - cost per mile, assuming fueling service to 10% of all light-duty vehicles in a typical 1.5 million person city in 2025. Our analysis considers three HRS sizes, four distinct types of EVSE and two distinct EVSE scenarios. EVSE station costs, including equipment and installation, are assumed to be 15% less than today's costs. We find that levelized retail capital costs per mile are essentially indistinguishable given the uncertainty and variability around input assumptions. Total fuel costs per mile for battery electric vehicle (BEV) and plug-in hybrid vehicle (PHEV) are, respectively, 21% lower and 13% lower than that for hydrogen fuel cell electric vehicle (FCEV) under the home-dominant scenario. Including fuel economies and vehicle costs makes FCEVs and BEVs comparable in terms of costs per mile, and PHEVs are about 10% less than FCEVs and BEVs. To account for geographic variability in energy prices and hydrogen delivery costs, we use the Scenario Evaluation, Regionalization and Analysis (SERA) model and confirm the aforementioned estimate of cost per mile, nationally averaged, but see a 15% variability in regional costs of FCEVs and a 5% variability in regional costs for BEVs.

Melaina, M.; Sun, Y.; Bush, B.

2014-08-01T23:59:59.000Z

452

Oregon/Transmission | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(UtilityCounty, Michigan:OregonTransmissionHeader.png Roadmap Agency Links Local

453

Idaho/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:GreerHiCalifornia:ISI Solar JumpObtainTransmission/Agency

454

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:GreerHiCalifornia:ISI Solar JumpObtainTransmission/AgencyState'sIdaho,

455

Forced cooling of underground electric power transmission lines : design manual  

E-Print Network [OSTI]

The methodology utilized for the design of a forced-cooled pipe-type underground transmission system is presented. The material is divided into three major parts: (1) The Forced-cooled Pipe-Type Underground Transmission ...

Brown, Jay A.

1978-01-01T23:59:59.000Z

456

Transmission System Performance Analysis for High-Penetration Photovoltaics  

SciTech Connect (OSTI)

This study is an assessment of the potential impact of high levels of penetration of photovoltaic (PV) generation on transmission systems. The effort used stability simulations of a transmission system with different levels of PV generation and load.

Achilles, S.; Schramm, S.; Bebic, J.

2008-02-01T23:59:59.000Z

457

An improved speech transmission index for intelligibility prediction Belinda Schwerin  

E-Print Network [OSTI]

transmission index; Modulation transfer function; Speech enhancement; Objective evaluation; Speech intelligibility; Short-time modulation spectrum 1. Introduction The enhancement of speech corrupted by noise hasAn improved speech transmission index for intelligibility prediction Belinda Schwerin , Kuldip

458

20% Wind Energy by 2030 - Chapter 4: Transmission and Integration...  

Broader source: Energy.gov (indexed) [DOE]

4: Transmission and Integration into the U.S. Electric System Summary Slides 20% Wind Energy by 2030 - Chapter 4: Transmission and Integration into the U.S. Electric System Summary...

459

Mode conversation losses in overmolded millimeter wave transmission lines  

E-Print Network [OSTI]

Millimeter wave transmission lines are integral components for many important applications like nuclear fusion and NMR spectroscopy. In low loss corrugated transmission lines propagating the HE,1 mode with a high waveguide ...

Tax, David S. (David Samuel)

2008-01-01T23:59:59.000Z

460

EIS-0421: Big Eddy-Knight Transmission Line  

Broader source: Energy.gov [DOE]

BPA is proposing to build a new 500 kilovolt (kV) transmission line in Wasco County, Oregon and Klickitat County, Washington and a new substation in Klickitat County. The new BPA transmission line...

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Biennial Assessment of the Fifth Power Plan Transmission Issues  

E-Print Network [OSTI]

unscheduled electricity flows over transmission lines leading to increased risks to electric system by the partners in the Colstrip 500 kV transmission lines (Northwestern Energy, Puget Sound Energy, Portland

462

Statistical Image Reconstruction Algorithms Using Paraboloidal Surrogates for PET Transmission  

E-Print Network [OSTI]

Statistical Image Reconstruction Algorithms Using Paraboloidal Surrogates for PET Transmission Reconstruction Algorithms Using Paraboloidal Surrogates for PET Transmission Scans by Hakan Erdogan Chair: Jeffrey A. Fessler Positron Emission Tomography (PET) is a diagnostic imaging tool that provides images

Fessler, Jeffrey A.

463

Cost analysis of NOx control alternatives for stationary gas turbines  

SciTech Connect (OSTI)

The use of stationary gas turbines for power generation has been growing rapidly with continuing trends predicted well into the future. Factors that are contributing to this growth include advances in turbine technology, operating and siting flexibility and low capital cost. Restructuring of the electric utility industry will provide new opportunities for on-site generation. In a competitive market, it maybe more cost effective to install small distributed generation units (like gas turbines) within the grid rather than constructing large power plants in remote locations with extensive transmission and distribution systems. For the customer, on-site generation will provide added reliability and leverage over the cost of purchased power One of the key issues that is addressed in virtually every gas turbine application is emissions, particularly NO{sub x} emissions. Decades of research and development have significantly reduced the NO{sub x} levels emitted from gas turbines from uncontrolled levels. Emission control technologies are continuing to evolve with older technologies being gradually phased-out while new technologies are being developed and commercialized. The objective of this study is to determine and compare the cost of NO{sub x} control technologies for three size ranges of stationary gas turbines: 5 MW, 25 MW and 150 MW. The purpose of the comparison is to evaluate the cost effectiveness and impact of each control technology as a function of turbine size. The NO{sub x} control technologies evaluated in this study include: Lean premix combustion, also known as dry low NO{sub x} (DLN) combustion; Catalytic combustion; Water/steam injection; Selective catalytic reduction (SCR)--low temperature, conventional, high temperature; and SCONO{sub x}{trademark}.

Bill Major

1999-11-05T23:59:59.000Z

464

Wind Integration, Transmission, and Resource Assessment andCharacteri...  

Energy Savers [EERE]

& Publications Wind Integration, Transmission, and Resource Assessment and Characterization Projects Offshore Wind Projects Testing, Manufacturing, and Component Development...

465

Transmission Project Reporting FPA 216h | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Disturbance Events Incident Reporting Emergency Situation Reports Energy Assurance Daily Transmission Project Reporting Library New Reports & Other Materials Meetings & Events...

466

EMTP modeling of CIGRE benchmark based HVDC transmission system operating with weak AC systems  

SciTech Connect (OSTI)

An EMTP based study of a CIGRE benchmark based HVDC system operating with weak ac systems is carried out. The modeled system provides a starting point for (a) educators teaching HVDC transmission courses and (b) for utility planners to develop their own low-cost dedicated digital simulators for training purposes. In this paper, modeling details of the ac-dc system, dc converters and control are presented. To validate the control schemes presented, the HVDC system is tested under ac-dc fault conditions. Results obtained from an EMTP-based study under these fault conditions are also presented in this paper.

Sood, V.K. [Hydro-Quebec, Varennes, Quebec (Canada); Khatri, V.; Jin, H. [Concordia Univ., Montreal, Quebec (Canada). Dept. of Electrical and Computer Engineering

1995-12-31T23:59:59.000Z

467

Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska  

SciTech Connect (OSTI)

This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

Not Available

1991-06-01T23:59:59.000Z

468

Structural Optimization of High Voltage Transmission Line Towers considering  

E-Print Network [OSTI]

Structural Optimization of High Voltage Transmission Line Towers considering Continuum and Discrete/or to common designs largely repeated (e.g. automotive compo- nents), and high voltage transmission towers can than conventional designs of high voltage transmission line towers. The optimization model proposed

Colominas, Ignasi

469

Free Vibrations of Coupled Spans of Overhead Transmission Lines  

E-Print Network [OSTI]

damage to the cables. Figure 1: Overhead transmission lines. Spans are suspended between towers fromFree Vibrations of Coupled Spans of Overhead Transmission Lines Sjoerd W. Rienstra Department transmission lines is studied. It is shown that the natural vibration is the gravity mode, which is free from

Eindhoven, Technische Universiteit

470

Transmission Pricing and Congestion Management: Efficiency, Simplicity and Open Access  

E-Print Network [OSTI]

Transmission Pricing and Congestion Management: Efficiency, Simplicity and Open Access Shmuel S-1403 Email OREN@IEOR.Berkeley.edu Abstract Transmission pricing and congestion management are the key the objectives of a transmission pricing and congestion management scheme. I contrast two extreme approaches

Oren, Shmuel S.

471

Application of High-Angle Annular Dark Field Scanning Transmission  

E-Print Network [OSTI]

Transmission Electron Microscopy-Energy Dispersive X-ray Spectrometry, and Energy-Filtered Transmission field scanning transmission electron microscopy (HAADF-STEM), STEM-energy-dispersive X-ray spectrometry). Techniquesthatareusefulinanalyzingultrafineatmospheric particles, such as STEM, EELS (electron energy loss spec- trometry), AFM, and mass spectrometry

Utsunomiya, Satoshi

472

Electricity generation with looped transmission networks: Bidding to an ISO  

E-Print Network [OSTI]

on a transmission network from net generation nodes to net consumption nodes is governed by the Kirchoff Laws [45Electricity generation with looped transmission networks: Bidding to an ISO Xinmin Hu Daniel Ralph to model markets for delivery of electrical power on looped transmission networks. It analyzes

Ferris, Michael C.

473

EIS-0390: Eastern Plains Transmission Project, Colorado and Kansas.  

Broader source: Energy.gov [DOE]

This EIS is for Western Area Power Administration's proposal to participate with Tri-State Generation and Transmission Association, Inc. (Tri-State), to construct the proposed Eastern Plains Transmission Project (Project). Western’s participation with Tri-State would be in exchange for capacity rights on the transmission lines.

474

TRANSMISSION ELECTRON MICROSCOPY OF WEAKLY DEFORMED ALKALI HALIDE CRYSTALS  

E-Print Network [OSTI]

377 TRANSMISSION ELECTRON MICROSCOPY OF WEAKLY DEFORMED ALKALI HALIDE CRYSTALS H. STRUNK Max'importance croissante du durcissement de la solution solide. Abstract. 2014 Transmission electron microscopy (TEM Abstracts 7j66 - 7 I' 1. Introduction. - It is only some years ago that transmission electron microscopy

Boyer, Edmond

475

Queue Prediction: an efficient scheduler for fast ATM cell transmission  

E-Print Network [OSTI]

Queue Prediction: an efficient scheduler for fast ATM cell transmission Peter Fenwick Department, if not impossible within the time constraints of fast ATM transmission (622 Mbps or higher). This paper presents a solution to this problem. By scheduling in advance the transmissions from queues it allows all output

Fenwick, Peter

476

Reference: RGL 83-09 Subject: POWER TRANSMISSION LINES  

E-Print Network [OSTI]

Reference: RGL 83-09 Subject: POWER TRANSMISSION LINES Title: MARKING OF AERIAL POWER TRANSMISSION. 1. The marking of aerial power transmission lines, cables, and structures over the navigable waters LINES, CABLES, & STRUCTURES Issued: 07/13/83 Expires: 12/31/85 Originator: DAEN-CWO-N Description: ARMY

US Army Corps of Engineers

477

Using Transmission Lines for Global On-Chip Communication  

E-Print Network [OSTI]

1 Using Transmission Lines for Global On-Chip Communication Aaron Carpenter, Jianyun Hu, Jie Xu-switched network-on-chip a less attractive option. An alternative solution uses well-engineered transmission lines as communication links. These transmission lines, along with simple, practical circuits using modern CMOS technol

Huang, Michael C.

478

Asymmetric parametric amplification in nonlinear left-handed transmission lines  

E-Print Network [OSTI]

Asymmetric parametric amplification in nonlinear left-handed transmission lines David A. Powell amplification in nonlinear left-handed transmission lines, which serve as model systems for nonlinear negative-handed regime. © 2009 American Institute of Physics. DOI: 10.1063/1.3089842 Left-handed transmission lines

479

Multifrequency Wilkinson Power Divider Using Microstrip Nonuniform Transmission Lines  

E-Print Network [OSTI]

Multifrequency Wilkinson Power Divider Using Microstrip Nonuniform Transmission Lines Mohammad desired frequencies. The proposed structure contains two Microstrip Nonuniform Transmission Lines (MNTLs­6] and using composite right/left-handed transmission line (CRLH) [7]. The main disadvantage of multistage

Paris-Sud XI, Université de

480

New approach for modelling distributed MEMS transmission lines  

E-Print Network [OSTI]

New approach for modelling distributed MEMS transmission lines K. Topalli, M. Unlu, S. Demir, O for the distributed MEMS transmission line (DMTL) structures. In this new model, the MEMS bridges that are used as the loading elements of the DMTL structures are represented as low-impedance transmission lines, rather than

Akin, Tayfun

Note: This page contains sample records for the topic "transmission costs due" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Wind Electrolysis: Hydrogen Cost Optimization  

SciTech Connect (OSTI)

This report describes a hydrogen production cost analysis of a collection of optimized central wind based water electrolysis production facilities. The basic modeled wind electrolysis facility includes a number of low temperature electrolyzers and a co-located wind farm encompassing a number of 3MW wind turbines that provide electricity for the electrolyzer units.

Saur, G.; Ramsden, T.

2011-05-01T23:59:59.000Z

482

Examples of Cost Estimation Packages  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Estimates can be performed in a variety of ways. Some of these are for projects for an undefined scope, a conventional construction project, or where there is a level of effort required to complete the work. Examples of cost estimation packages for these types of projects are described in this appendix.

1997-03-28T23:59:59.000Z

483

Pollution prevention cost savings potential  

SciTech Connect (OSTI)

The waste generated by DOE facilities is a serious problem that significantly impacts current operations, increases future waste management costs, and creates future environmental liabilities. Pollution Prevention (P2) emphasizes source reduction through improved manufacturing and process control technologies. This concept must be incorporated into DOE`s overall operating philosophy and should be an integral part of Total Quality Management (TQM) program. P2 reduces the amount of waste generated, the cost of environmental compliance and future liabilities, waste treatment, and transportation and disposal costs. To be effective, P2 must contribute to the bottom fine in reducing the cost of work performed. P2 activities at LLNL include: researching and developing innovative manufacturing; evaluating new technologies, products, and chemistries; using alternative cleaning and sensor technologies; performing Pollution Prevention Opportunity Assessments (PPOAs); and developing outreach programs with small business. Examples of industrial outreach are: innovative electroplating operations, printed circuit board manufacturing, and painting operations. LLNL can provide the infrastructure and technical expertise to address a wide variety of industrial concerns.

Celeste, J.

1994-12-01T23:59:59.000Z

484

Development and Manufacture of Cost Effective Composite Drill Pipe  

SciTech Connect (OSTI)

This technical report presents the engineering research, process development and data accomplishments that have transpired to date in support of the development of Cost Effective Composite Drill Pipe (CDP). The report presents progress made from October 1, 2004 through September 30, 2005 and contains the following discussions: (1) Qualification Testing; (2) Prototype Development and Testing of ''Smart Design'' Configuration; (3) Field Test Demonstration; and (4) Commercial order for SR-CDP from Torch International. The objective of this contract is to develop and demonstrate ''cost effective'' Composite Drill Pipe. It is projected that this drill pipe will weigh less than half of its steel counter part. The resultant weight reduction will provide enabling technology that will increase the lateral distance that can be reached from an offshore drilling platform and the depth of water in which drilling and production operations can be carried out. Further, composite drill pipe has the capability to carry real time signal and power transmission within the pipe walls. CDP can also accommodate much shorter drilling radius than is possible with metal drill pipe. As secondary benefits, the lighter weight drill pipe can increase the storage capability of floating off shore drilling platforms and provide substantial operational cost savings.

James C. Leslie; James C. Leslie II; Lee Truong; James T. Heard; Steve Loya

2006-02-20T23:59:59.000Z

485

1. Birru, D., C.-T. Chou, and A. Seyedi, "Coordination in Wireless Networks Having Devices with Different Physical Layer Transmission Schemes," US Patent 8233505, Jul. 31, 2012.  

E-Print Network [OSTI]

Patents 1. Birru, D., C.-T. Chou, and A. Seyedi, "Coordination in Wireless Networks Having Devices with Different Physical Layer Transmission Schemes," US Patent 8233505, Jul. 31, 2012. 2. Birru, D. and A. Seyedi, "Cost-Effective Preamble Structure for High-Speed Communication of Packetized System," US Patent 8

Pattanaik, Sumanta N.

486

Ionization and transmission efficiency in an electrospray ionization-mass spectrometry interface  

SciTech Connect (OSTI)

The efficiency of sample ionization by electrospray ionization (ESI) and the transmission of the charged droplets and gas-phase ions through an ESI interface were investigated in order to advance the understanding of how these factors affect mass spectrometry (MS) sensitivity. In addition, the effects of the ES emitter distance to the inlet, solution flow rate, and inlet temperature to the ionization and transmission efficiency were characterized. Quantitative measurements of ES current loss throughout the ESI interface were accomplished by electrically isolating the front surface of the interface from the inner wall of the heated inlet capillary, enabling losses on the two surfaces to be distinguished. The ES current lost to the front surface of the ESI interface was also spatially profiled with a linear array of 340-µm-dia. electrodes placed adjacent to the inlet capillary entrance. Current transmitted as gas-phase ions was differentiated from charged droplets and solvent clusters by directly measuring sensitivity with a single quadrupole mass spectrometer. The study has revealed a large sampling efficiency into the inlet capillary (>90% at an emitter distance of 1 mm), a global rather than a local gas dynamic effect on the shape of the ES plume due to the gas flow conductance limit of the inlet capillary, a large (>80%) loss of analyte after transmission through the inlet due to incomplete desolvation at a solution flow rate of 1.0 µL/min, and a decrease in analyte peak intensity at lower temperatures, despite a large increase in ES current transmission efficiency. These studies provide a clearer understanding of the parameters affecting ion transmission into the mass spectrometer, and will serve to guide the design of more efficient instrument interfaces.

Page, Jason S.; Kelly, Ryan T.; Tang, Keqi; Smith, Richard D.

2007-09-01T23:59:59.000Z

487

23: Poultry Judging registration due to state office 29: Doughnut Sale Forms due for Council Fundraiser  

E-Print Network [OSTI]

May 23: Poultry Judging registration due to state office 29: Doughnut Sale Forms due for Council 3: Just Kiddin' 4-H Club annual banquet 6: State Poultry Judging Contest, Registration at 9:15am

Jawitz, James W.

488

Capturing the cloud of MRSA diversity after transmission and during infection 2 reveals complex and heterogenous carriage and transmission  

E-Print Network [OSTI]

1 Capturing the cloud of MRSA diversity after transmission and during infection 1 reveals complex and heterogenous carriage and transmission 2 3 Running title: MRSA tracking and the cloud of diversity 4 5 Gavin K. Paterson 1#¶, Ewan M... transmission event. To 55 further understand the cloud of diversity that exists within colonized individuals and 56 5 during transmission, we undertook deep sequencing of a methicillin-resistant S. aureus 57 (MRSA) ‘outbreak’ at a veterinary hospital...

Paterson, Gavin K.; Harrison, Ewan M.; Murray, Gemma G.R.; Welch, John J.; Warland, James H.; Holden, Matthew T.G.; Morgan, Fiona J.E.; Ba, Xiaoliang; Koop, Gerrit; Harris, Simon R.; Maskell, Duncan J.; Peacock, Sharon J.; Herrtage, Michael E.; Parkhill, Julian; Holmes, Mark A.

2015-01-01T23:59:59.000Z

489

Hafnium Resonance Parameter Analysis Using Neutron Capture and Transmission Experiments  

SciTech Connect (OSTI)

The focus of this work is to determine the resonance parameters for stable hafnium isotopes in the 0.005 - 200 eV region, with special emphasis on the overlapping {sup 176}Hf and {sup 178}Hf resonances near 8 eV. Accurate hafnium cross sections and resonance parameters are needed in order to quantify the effects of hafnium found in zirconium, a metal commonly used in reactors. The accuracy of the cross sections and the corresponding resonance parameters used in current nuclear analysis tools are rapidly becoming the limiting factor in reducing the overall uncertainty on reactor physics calculations. Experiments measuring neutron capture and transmission are routinely performed at the Rensselaer Polytechnic Institute (RPI) LINAC using the time-of flight technique. {sup 6}Li glass scintillation detectors were used for transmission experiments at flight path lengths of 15 and 25 m, respectively. Capture experiments were performed using a sixteen section NaI multiplicity detector at a flight path length of 25 m. These experiments utilized several thicknesses of metallic and isotope-enriched liquid Hf samples. The liquid Hf samples were designed to provide information on the {sup 176}Hf and {sup 178}Hf contributions to the 8 eV doublet without saturation. Data analyses were performed using the R-matrix Bayesian code SAMMY. A combined capture and transmission data analysis yielded resonance parameters for all hafnium isotopes from 0.005 - 200 eV. Additionally, resonance integrals were calculated, along with errors for each hafnium isotope, using the NJOY and INTER codes. The isotopic resonance integrals calculated were significantly different than previous values. The {sup 176}Hf resonance integral, based on this work, is approximately 73% higher than the ENDF/B-VI value. This is due primarily to the changes to resonance parameters in the 8 eV resonance, the neutron width presented in this work is more than twice that of the previous value. The calculated elemental hafnium resonance integral however, changed very little.

Trbovich, M J; Barry, D P; Slovacek, R E; Danon, Y; Block, R C; Francis, N C; Lubert, M; Burke, J A; Drindak, N J; Lienweber, G; Ballad, R

2007-02-06T23:59:59.000Z

490

A Second Opinion is Worth the Cost - 12479  

SciTech Connect (OSTI)

This paper, 'A Second Opinion is Worth the Cost', shows how a second opinion for a Department of Energy (DOE) Project helped prepare and pass a DOE Order 413.3A 'Program and Project Management for the acquisition of Capital Assets' Office of Engineering and Construction Management (OECM) required External Independent Review (EIR) in support of the approved baseline for Critical Decision (CD) 2. The DOE project personnel were informed that the project's Total Project Cost (TPC) was going to increase from $815 million to $1.1 billion due to unforeseen problems and unexplained reasons. The DOE Project Team determined that a second opinion was needed to review and validate the TPC. Project Time and Cost, Inc. (PT and C) was requested to evaluate the cost estimate, schedule, basis of estimate (BOE), and risk management plan of the Project and to give an independent assessment of the TPC that was presented to DOE. This paper will demonstrate how breaking down a project to the work breakdown structure (WBS) level allows a project to be analyzed for potential cost increases and/or decreases, thus providing a more accurate TPC. The review Team's cost analyses of Projects identified eight primary drivers resulting in cost increases. They included: - Overstatement of the effort required to develop drawings and specifications. - Cost allocation to 'Miscellaneous' without sufficient detail or documentation. - Cost for duplicated efforts. - Vendor estimates or quotations without sufficient detail. - The practice of using the highest price quoted then adding an additional 10% mark-up. - Application of Nuclear Quality Assurance (NQA) highest level quality requirements when not required. - Allocation of operational costs to the Project Costs instead of to the Operating Expenses (OPEX). OPEX costs come from a different funding source. - DOE had not approved the activities. By using a Team approach with professionals from cost, civil, mechanical, electrical, structural and nuclear disciplines and by performing a Line by Line, WBS element by WBS element review of the Projects' CD-2 baseline package helped the DOE Project Team experience success. The second opinion that PT and C provide by conducting a Pre-EIR review of the Project baseline package and the cost review of the TPC helped the DOE Team pass the CD-2 EIR and reduced the TPC. The Line-by-Line review of the DOE Project identified opportunities to reduce the TPC from $1.1 billion to $740.8 million, thus realizing a saving of approximately $359.2 million, or roughly 32% of the original TPC. This significant cost savings underscores the cost in obtaining the second opinion. This same Line by Line review can be applied to any DOE project in the Energy Management or Weapons complex. In the case of this DOE Project a second opinion was worth the cost. (authors)

Madsen, Drew [Project Time and Cost Inc. (United States)

2012-07-01T23:59:59.000Z

491

Violent Wave Motion due to Impact Violent Wave Motion due to Impact  

E-Print Network [OSTI]

Violent Wave Motion due to Impact Violent Wave Motion due to Impact Mark J. Cooker School of Mathematics, University of East Anglia, Norwich, England. m.cooker@uea.ac.uk Theory of Water Waves, Cambridge Motion due to Impact 2. Pressure-Impulse Theory 214 M.J. COOKER AND D.H. PEREGRINE Y; O: .-- I mpact zone

492

Economic analysis of the N-1 reliable unit commitment and transmission switching problem using duality concepts  

E-Print Network [OSTI]

is a result due to using linear generator costs. Figure 4linear scarcity rent over the time horizon for generator g.linear program and ? gt can be interpreted as the marginal value of an increase in capacity and is called the generator

O’Neill, Richard P.; Hedman, Kory W.; Krall, Eric A.; Papavasiliou, Anthony; Oren, Shmuel S.

2010-01-01T23:59:59.000Z

493

Scheduling Trains and Containers with Due Dates and Dynamic Arrivals  

E-Print Network [OSTI]

. There is a fixed-charge transportation cost for each vehicle, and each vehicle has the same capacity. The cost to the destination which includes the cost of labor for the movement of the vehicle and any other costs. Newman Department of Industrial Engineering and Operations Research, University of California, Berkeley

494

Ponderomotive phase plate for transmission electron microscopes  

DOE Patents [OSTI]

A ponderomotive phase plate system and method for controllably producing highly tunable phase contrast transfer functions in a transmission electron microscope (TEM) for high resolution and biological phase contrast imaging. The system and method includes a laser source and a beam transport system to produce a focused laser crossover as a phase plate, so that a ponderomotive potential of the focused laser crossover produces a scattering-angle-dependent phase shift in the electrons of the post-sample electron beam corresponding to a desired phase contrast transfer function.

Reed, Bryan W. (Livermore, CA)

2012-07-10T23:59:59.000Z

495

Utah/Transmission | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov PtyInformation UC 19-6-401UpsonUtah State HistoricInformationTransmission

496

Transmission Access Resources | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for Transmission

497

Electricity Transmission, A Primer | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQ Contract ESPCElectrical Safety2011:2011:EnergyofTransmission,

498

Sandia National Laboratories: transmission grid integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1developmentturbineredox-activeNational SolartSSLPV materialsmethodstransmission

499

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd JumpGTZHolland, Illinois:5717551°Farms Ltd Jump to:Southline Transmission

500

Transmission/Resource Library | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,LtdInformation Dixie ValleyLibrary < Transmission Jump to: