Powered by Deep Web Technologies
Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Hybrid Transmission Corridor study  

SciTech Connect (OSTI)

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

2

DOE Affirms National Interest Electric Transmission Corridor Designations |  

Broader source: Energy.gov (indexed) [DOE]

Affirms National Interest Electric Transmission Corridor Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations. The U.S. Department of Energy (DOE) today denied requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as areas of significant electricity congestion and constraint. The designation of national corridors was made in accordance with the Energy Policy Act of 2005 (EPAct). DOE Affirms National Interest Electric Transmission Corridor Designations More Documents & Publications DOE Designates Southwest Area and Mid-Atlantic Area National Interest

3

BPA, Transmission, I-5 Corridor Project, data by segments and...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

alternatives for new transmission system facilities, including the new transmission line and substations proposed for the I-5 Corridor Reinforcement Project. Foremost is...

4

DOE Affirms National Interest Electric Transmission Corridor Designations |  

Broader source: Energy.gov (indexed) [DOE]

Affirms National Interest Electric Transmission Corridor Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations March 6, 2008 - 11:54am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today denied requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as areas of significant electricity congestion and constraint. The designation of national corridors was made in accordance with the Energy Policy Act of 2005 (EPAct). In affirming the National Corridor designations today, DOE dismissed as being without merit challenges raised by the applicants for rehearing, citing extensive data analysis conducted in its 2006 National Interest Electric Transmission

5

BPA, Transmission, I-5 Corridor Reinforcement Project, August...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Administration has refined the potential transmission line route segments and substation sites for the proposed I-5 Corridor Reinforcement Project. The refinements are...

6

BPA, Transmission, I-5 Corridor Reinforcement Project Update...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

environmental impact statement (EIS) for our proposed I-5 Corridor Reinforcement Project. BPA is proposing to build a 500-kilovolt transmission line to reinforce the high-voltage...

7

DOE Issues Two Draft National Interest Electric Transmission Corridor  

Broader source: Energy.gov (indexed) [DOE]

Issues Two Draft National Interest Electric Transmission Issues Two Draft National Interest Electric Transmission Corridor Designations DOE Issues Two Draft National Interest Electric Transmission Corridor Designations April 26, 2007 - 10:58am Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the issuance of two draft National Interest Electric Transmission Corridor (National Corridor) designations. The Energy Policy Act of 2005 authorizes the Secretary, based on the findings of DOE's National Electric Transmission Congestion Study (Congestion Study), to designate National Corridors. "These draft designations set us on the path to modernize our constrained and congested electric power infrastructure. They are a crucial step toward realizing President Bush's goal of a modern, more efficient electric

8

Order Denying Rehearing: Docket No. 2007-OE-01, Mid-Atlantic Area National  

Broader source: Energy.gov (indexed) [DOE]

Order Denying Rehearing: Docket No. 2007-OE-01, Mid-Atlantic Area Order Denying Rehearing: Docket No. 2007-OE-01, Mid-Atlantic Area National Interest Electric Transmission Corridor; Docket No. 2007-0E-02, Southwest Area National Interest Electric Transmission Corridor Order Denying Rehearing: Docket No. 2007-OE-01, Mid-Atlantic Area National Interest Electric Transmission Corridor; Docket No. 2007-0E-02, Southwest Area National Interest Electric Transmission Corridor For the reasons set forth herein, it is hereby ordered that: A. In Docket No. 2007-OE-01, the applications for rehearing and stay are denied. Any party to thisproceeding that submitted a timely application for rehearing and is aggrieved by the Report and Order and this Order may seek judicial review in a United States Circuit Court of Appeals pursuant to

9

BPA, Transmission, I-5 Corridor Reinforcement Project, meeting...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPA I-5 Corridor Reinforcement Project - AugustSeptember 2010 Open Houses Page 1 of 4 Meeting Summary and Survey Results BPA I-5 Corridor Reinforcement Project - AugustSeptember...

10

BPA Transmission, I-5 Corridor Reinforcement Project, letter...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

near Castle Rock, Washington in Cowlitz County, to a new substation near BPA's Troutdale Substation, Troutdale, Oregon in Multnomah County. BPA is proposing the I-5 Corridor...

11

The effect of transmission-line corridor edge and successional stage on the animal community. Final report  

SciTech Connect (OSTI)

Using breeding success as a criterion of habitat quality, this report evaluates the suitability of 2 transmission-line corridor habitat types, grassland and shrubland, for open-nesting passerines in western Maryland. The main objectives were to investigate the patterns of fledging success and spatial distribution of nests in each habitat type in relation to the corridor, corridor-forest edge, and the adjacent forest, and to quantify important features of the microhabitat of corridor and forest nests that may influence nest success. The second part of this report examines the effect of a transmission-line corridor on forest animal communities by monitoring their activity patterns in the corridor. Animal activity patterns are compared between a transmission-line corridor that was maintained in shrubby vegetation by selective spraying of herbicides and one that was managed for herbaceous vegetation by mowing with rotary mowers.

Gates, D.J.E.

1982-01-01T23:59:59.000Z

12

DEPARTMENT OF ENERGY National Electric Transmission Congestion Report  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Report National Electric Transmission Congestion Report [Docket No. 2007-OE-01, Mid-Atlantic Area National Interest Electric Transmission Corridor; Docket No. 2007-0E-02, Southwest Area National Interest Electric Transmission Corridor] AGENCY: Department of Energy. ACTION: Order Denying Rehearing. SUMMARY: On October 5,2007, the Department of Energy (Department or DOE) published in the Federal Register a National Electric Transmission Congestion Report and Order (Report and Order) in the above dockets in which it designated the Mid- Atlantic Area and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) (72 FR 56992). Numerous parties in each of the above named dockets filed timely applications for rehearing of DOE's Report and Order. Some parties

13

BPA, transmission, I-5 Corridor Reinforcement Project, new Permission...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

also identify protective measures that BPA would take during the construction process if BPA decides to build a transmission line or substation. An archeologist or historian may...

14

BPA transmission, I-5 corridor reinforcement project, updated...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities Proposed New Substation sde.SDE.BPAPlannedTlines sde.SDE.BPAPlannedTlines BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

15

BPA Transmission, I-5 Corridor Reinforcement Project, Scoping...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the transmission lines and consider energy efficiency strategies. Commenters also asked BPA to consider whether a new substation will be needed half-way between Troutdale and...

16

BPA, Transmission, I-5 Corridor Reinforcement Project Map, August...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

lettered route segments added for consideration Segments no longer being considered 5 K BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

17

BPA, proposed I-5 Corridor Reinforcement transmission project...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Regional GIS Database, 2009. Facilities Proposed New Substation Proposed Route Segments BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

18

BPA, Transmission, I-5 Corridor Reinforcement Project, presentation...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Project 500-kilovolt transmission New substations at - Castle Rock, Wash. - Troutdale, Ore. 70 miles apart Many route segments 17 Factors we consider Electrical needs for...

19

BPA, Transmission, presentation on I-5 Corridor Reinforcement...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

high-voltage line between two proposed substations in Castle Rock, Washington and Troutdale, Oregon. Would relieve a major transmission bottleneck in the Northwest. BPA has not...

20

Public Technical Conference on DOE Congestion Study and Criteria for Designation of National Interest Electric Transmission Corridors  

Broader source: Energy.gov (indexed) [DOE]

Technical Conference Technical Conference DOE Congestion Study and Criteria Designation of National Interest Electric Transmission Corridors March 29, 2006 Comments of Edward D. Tatum, Jr. Old Dominion Electric Cooperative Constraint Area and Corridor Designation * Corridors need to be "just right" * Too broad a designation could frustrate Congress' intent to facilitate licensing * Identify specific facilities rather than a family of alternatives - Too many; too long - Recognize impact on existing facilities Constraint Area and Corridor Designation * Existing infrastructure points with generalized paths between * Need "off ramps" * Opportunity to upgrade existing facilities or utilize existing ROW * Need to deliver into congested area * Provide States necessary opportunity for final

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

BPA, transmission, I-5 Corridor Reinforcement Project, letter...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

made to the PEP form and how they affect any rights you may or have granted. Background - BPA is proposing to build a 500-kilovolt transmission line and associated substations. The...

22

BPA, Transmission, I-5 Corridor Reinforcement Project, abbreviated...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Project 500-kilovolt transmission New substations at - Castle Rock, Wash. - Troutdale, Ore. 70 miles apart Many route segments 9 Benefits of a new line Keeps the lights...

23

Monitoring voltage collapse margin with synchrophasors across transmission corridors with multiple lines and multiple contingencies  

E-Print Network [OSTI]

We use synchrophasor measurements of the complex voltage and current at both ends of multiple transmission lines that connect areas of a power system to monitor the online voltage collapse margin. A new reduction is used to reduce the multiple transmission lines to a single line equivalent and determine how to combine the synchrophasor measurements. Generator reactive power limits can be accommodated. The results show that this methodology can capture the effect of multiple contingencies inside the transmission corridors, giving awareness to the operators about the severity of contingencies with respect to voltage stability.

Ramirez, Lina

2014-01-01T23:59:59.000Z

24

DOE/EIS-0285-SA-139: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Little Goose-Lower Granite Corridor Maintenance (4/3/03)  

Broader source: Energy.gov (indexed) [DOE]

9-Little Goose-Lower Granite Corridor Maintenance 9-Little Goose-Lower Granite Corridor Maintenance William Erickson Natural Resource Specialist - TFP/Walla Walla Proposed Action: Vegetation Management for the Little Goose-Lower Granite #1 and #2 Transmission Line Corridor from Towers 4/3 to 8/1. The right-of-way has an easement width of 258 feet and contains two 500kV Single Circuit Transmission Lines. The proposed work will be accomplished in the indicated sections of the transmission line corridor as referenced in the attached checklist. Location: The subject right-of-way is located in Columbia County, WA., being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: The work will be accomplished by an Integrated Vegetation Management approach using a combination of manual, mechanical, herbicides and biological

25

COMM-OPINION-ORDER, 76 FERC 61,347, Promoting Wholesale Competition Through Open-Access Non-discriminatory Transmission Services by Public Utilities, Docket No. RM95-8-000, Recovery of Stranded Costs by  

E-Print Network [OSTI]

-discriminatory Transmission Services by Public Utilities, Docket No. RM95-8-000, Recovery of Stranded Costs by Public Utilities and Transmitting Utilities, Docket No. RM94-7-001, (Sep. 27, 1996) COPYRIGHT 1999, CCH by Public Utilities, Docket No. RM95-8-000, Recovery of Stranded Costs by Public Utilities and Transmitting

Laughlin, Robert B.

27

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Larry Rappaport  

Broader source: Energy.gov [DOE]

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

28

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from John Brodeer  

Broader source: Energy.gov [DOE]

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

29

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Robert Martin  

Broader source: Energy.gov [DOE]

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

30

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Michael Marino  

Broader source: Energy.gov [DOE]

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

31

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners  

Broader source: Energy.gov [DOE]

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada border.

32

Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line  

Broader source: Energy.gov [DOE]

Application from Great Northern  (GNTL) to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

33

Nest predation, predator abundance, and avian diversity in transmission line corridors and adjacent habitats in east central Texas  

E-Print Network [OSTI]

corridors may have differential effects on wildlife communities in adjacent vegetation types in a heterogeneous landscape. I evaluated the effects of ROW corridors on avian and nest predator communities in forests and pastures in east central Texas in 1998...

Hubbard, Tani Ann

2000-01-01T23:59:59.000Z

34

Application for Presidential permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

permit OE Docket No. PP-230-4 International Transmission Company: Response of New York Transmission Owners to ITC Application for Presidential permit OE Docket No....

35

Energy Corridors on Federal Lands  

Broader source: Energy.gov [DOE]

To improve energy delivery and enhance the electric transmission grid for the future, several government agencies currently are working together to establish a coordinated network of Federal energy corridors on Federal lands throughout the United States.

36

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from State Senator Jeanie Forrester  

Broader source: Energy.gov [DOE]

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

37

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from National Park Service- Wendy Jannsen  

Broader source: Energy.gov [DOE]

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

38

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Lee Ann Moulder  

Broader source: Energy.gov [DOE]

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

39

Hawaii Geothermal Project annotated bibliography: Biological resources of the geothermal subzones, the transmission corridors and the Puna District, Island of Hawaii  

SciTech Connect (OSTI)

Task 1 of the Hawaii Geothermal Project Interagency Agreement between the Fish and Wildlife Service and the Department of Energy-Oak Ridge National Laboratory (DOE) includes an annotated bibliography of published and unpublished documents that cover biological issues related to the lowland rain forest in Puna, adjacent areas, transmission corridors, and in the proposed Hawaii Geothermal Project (HGP). The 51 documents reviewed in this report cover the main body of biological information for these projects. The full table of contents and bibliography for each document is included along with two copies (as requested in the Interagency Agreement) of the biological sections of each document. The documents are reviewed in five main categories: (1) geothermal subzones (29 documents); (2) transmission cable routes (8 documents); (3) commercial satellite launching facility (Spaceport; 1 document); (4) manganese nodule processing facility (2 documents); (5) water resource development (1 document); and (6) ecosystem stability and introduced species (11 documents).

Miller, S.E.; Burgett, J.M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

1993-10-01T23:59:59.000Z

40

Application for Presidential Permit OE Docket No. PP-299 Sea...  

Broader source: Energy.gov (indexed) [DOE]

99 Sea Breeze Pacific Regional Transmission System, INC Application for Presidential Permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System, INC TBDApplication...

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator  

Broader source: Energy.gov [DOE]

Supplemental comments of the Midwest Independent Transmission System Operaton on the application from International Transmission Company to construct, operate, and maintain electric transmission...

42

Application for Presidential Permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

Letter from New York Transmission Owners Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners...

43

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Broader source: Energy.gov (indexed) [DOE]

Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Notice of Intent to Prepare an Environmental Impact Statement: Federal...

44

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Broader source: Energy.gov (indexed) [DOE]

Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Federal Register Notice, Vol. 79, No. 93 - May 14, 2014 Application...

45

Application for Presidential Permit OE Docket No. PP-398 Minnesota...  

Broader source: Energy.gov (indexed) [DOE]

Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line Application from Great Northern (GNTL) to construct, operate and...

46

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Midwest Independent Midwest Independent Transmission System Operator Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Midwest Independent Transmission System Operator Comments of the Midwest Independent Transmission System Operaton on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for presidential permit OE Docket No. 230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator Application for presidential permit OE Docket No. PP-230-4 International

47

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Reply Comments Reply Comments Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Reply Comments Reply Comments of International Transmission Company in reference to application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Independent Electricity System Operator Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners Application for Presidential Permit OE Docket No. PP-230-4 International

48

Application for Presidential Permit OE Docket No: PP-371 Northern Pass  

Broader source: Energy.gov (indexed) [DOE]

No: PP-371 Northern No: PP-371 Northern Pass Transmission: Comments from William and Michelle Shoemaker Application for Presidential Permit OE Docket No: PP-371 Northern Pass Transmission: Comments from William and Michelle Shoemaker Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. Shoemaker_Comments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Linda Upham Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Fred Brownson

49

Watering the Sun Corridor  

E-Print Network [OSTI]

Watering the Sun Corridor Managing Choices in Arizona's Megapolitan Area #12;#12;Managing ChoicesSored by Printing generously provided by SRP. Watering the Sun Corridor Tom Buschatzke, City of Phoenix Peter Culp i C y | 5 Introduction............................................7 I. The Sun Corridor

Hall, Sharon J.

50

Energy Corridors on Federal Lands | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Corridors on Federal Lands Energy Corridors on Federal Lands Energy Corridors on Federal Lands In many areas of the United States, the infrastructure required to deliver energy has not always kept pace with growth in demand. To improve energy delivery and enhance the electric transmission grid for the future, several government agencies currently are working together to establish a coordinated network of Federal energy corridors on Federal lands throughout the United States. Energy corridors would help address growing energy demand by facilitating future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities, while also protecting the environment. As the agency-preferred siting locations, the energy transport corridors will provide industry and the public with

51

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: PJM Letter filed Dec 8, 2011 in support of Settlement Agreement  

Broader source: Energy.gov [DOE]

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S - Canada border.

52

Application for presidential permit OE Docket No. PP-371 Northern Pass  

Broader source: Energy.gov (indexed) [DOE]

Addendum to Application Addendum to Application Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Addendum to Application On October 14, 2010, Northern Pass Transmission, LLC submitted an application for a Presidential Permit to construct a 1,200 MW high voltage direct current ("HVDC") transmission line (the "Application") from the Des Cantons substation in Quebec, to Franklin, New Hampshire (the "Project"). Northern Pass Transmission, LLC Docket No. PP-371 Addendum to Application More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Lee Ann Moulder Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Linda Upham

53

Proposed Energy Transport Corridors: West-wide energy corridor programmatic  

Broader source: Energy.gov (indexed) [DOE]

Energy Transport Corridors: West-wide energy corridor Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Map of the area covered by a programmatic environmental impact statement (PEIS), "Designation of Energy Corridors on Federal Land in the 11 Western States" (DOE/EIS-0386) to address the environmental impacts from the proposed action and the range of reasonable alternatives. The proposed action calls for designating more than 6,000 miles of energy transport corridors across the West. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. More Documents & Publications

54

Application for Presidential Permit OE Docket No. PP-022-4 British Columbia  

Broader source: Energy.gov (indexed) [DOE]

for Presidential Permit OE Docket No. PP-022-4 British for Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation Application for Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation Application from British Columbia Transmission Corporation to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation More Documents & Publications Application to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78 - Apr. 24, 2007 Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority

55

Application for Presidential Permit OE Docket No. PP-230-3 International  

Broader source: Energy.gov (indexed) [DOE]

Presidential Permit OE Docket No. PP-230-3 Presidential Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission Application for Presidential Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission Application from International Transmission Company d/b/a ITCTransmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission More Documents & Publications Application for Presidential Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission Application for presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC Holdings Corporation Limited Partnership, International Transmission

56

Application for presidential permit OE Docket No. PP-334 Baja Wind U.S  

Broader source: Energy.gov (indexed) [DOE]

presidential permit OE Docket No. PP-334 Baja Wind presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC: Federal Register Notice Volume 73, No. 36 - Feb. 22, 2008 Application for presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC: Federal Register Notice Volume 73, No. 36 - Feb. 22, 2008 Federal Register Notice in Vol 73 No 36 of Application from Baja Wind U.S Transmission LLC to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border. Application for presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC More Documents & Publications Application for Presidential Permit OE Docket No. PP-334 Baja Wind Transmission, LLC Application for presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC: Update

57

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

from PJM Interconnection LLC Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from PJM...

58

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

PP-230-4 International Transmission Company: Response to Late Motion to Intervene from PJM Interconnection LLC Application for presidential permit OE Docket No. PP-230-4...

59

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

New York Independent System Operator Inc Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the New York Independent System...

60

Application for Presidential Permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

Comments of the Public Utilities Commission of Ohio Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Public Utilities...

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Application for Presidential Permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

Motion to Intervene and Comment on behalf of The Public Utilities Commission of Ohio Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company:...

62

Application for Presidential Permit OE Docket No. PP-230-3 International  

Broader source: Energy.gov (indexed) [DOE]

Permit OE Docket No. PP-230-3 Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission Application for Presidential Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission Application for Presidential Permit authorizing International Transmission Company to construct, operate, and maintain electric transmission facilities at teh U.S. - Canada Border. PP-230-3 International Transmission Company More Documents & Publications Application for Presidential Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission Application for presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC Holdings Corporation Limited Partnership, International Transmission Company, and DTE Energy Company PP-230-3 International Transmission Company

63

Application for presidential permit OE Docket No. PP-334 Energia Sierra Juarex U.S Transmission LLC: Notice of Intent To Prepare an Environmental Impact Statement.  

Broader source: Energy.gov [DOE]

Application from Energia Sierra Juarex U.S Transmission LLC to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border. Notice of intent to prepare an...

64

Amended Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line: Federal Register Notice, Volume 79, No. 222- Nov. 18, 2014  

Broader source: Energy.gov [DOE]

Minnesota Power, Great Northern Transmission Line has submitted an amended application for a Presidential Permit to construct, operate, maintain and connect an electric transmission line across the United States border with Canada.

65

Application for Presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

permit OE Docket No. PP-230-4 permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Independent Electricity System Operator Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Independent Electricity System Operator Comments of the Independent Electricity System Operator on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for persidential permit OE Docket No. PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-362 Champlain Hudson Power Express Inc Application for presidential permit OE Docket No. PP-230-4 International

66

Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line: Federal Register Notice, Vol. 79, No. 93- May 14, 2014  

Broader source: Energy.gov [DOE]

Application from Great Northern  (GNTL) to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. Federal Register Notice.

67

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

presidential permit OE Docket No. PP-230-4 presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of The Detriot Edison Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of The Detriot Edison Company The Detriot Edison Company hereby submits these comments and a motion in the alternative for leave to intervene out of time in response to the January 5, 2009 filing by international transmission company. Docket No. PP-230-04 Comments and Motion in the Alternative for Leave to Intervene Out of Time of The Detriot Edison Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene and Comments Application for presidential permit OE Docket No. PP-230-4 International

68

Application for Presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Presidential permit OE Docket No. PP-230-4 Presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of New York Transmission Owners to ITC Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of New York Transmission Owners to ITC Response of New York Transmission Owners to answer of ITC in regard to the application for a Presidential Peermit authorizing International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene of New York Transmission Owners

69

Application for Presidential Permit OE Docket No. PP-369 British Columbia  

Broader source: Energy.gov (indexed) [DOE]

69 British 69 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application from British Columbia Transmission Corporation and British Columbia Hydro and Power Authority to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority More Documents & Publications PP-369 British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation

70

Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line: Amended Letter to New Border Crossing  

Broader source: Energy.gov [DOE]

Minnesota Power, an operating division of ALLETE, Inc., has submitted an amended application for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the United States border with Canada.

71

Application for presidential permit OE Docket No. PP-371 Northern Pass  

Broader source: Energy.gov (indexed) [DOE]

LLC: Federal Register Notice Volume 75, No. 220 - Nov. LLC: Federal Register Notice Volume 75, No. 220 - Nov. 16, 2010 Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Federal Register Notice Volume 75, No. 220 - Nov. 16, 2010 Application from Northern Pass Transmission LLC to construct, operate, and maintain electric transmission facilities at the U.S-Canada border.. Federal Register Notice Vol 75 No 220. Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC More Documents & Publications Application for presidential permit OE Docket No. PP-362 Champlain Hudson: Federal Register Notice Volume 75, No. 43 - Mar. 5, 2010 Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Addendum to Application Application for Presidential Permit OE Docket No. PP-371 Northern Pass

72

Application to Amend Presidential Permit OE Docket No. PP-022-4 British  

Broader source: Energy.gov (indexed) [DOE]

to Amend Presidential Permit OE Docket No. PP-022-4 to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78 - Apr. 24, 2007 Application to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78 - Apr. 24, 2007 Application from British Columbia Transmission Corporation to amend Presidential Permit to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border: Federal Register Notice Application to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice, Volume 72, No. 78 More Documents & Publications Application for Presidential Permit OE Docket No. PP-022-4 British Columbia

73

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Out of Time Petition to Intervene and Out of Time Petition to Intervene and Comments of Baltimore Gas and Electric Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Out of Time Petition to Intervene and Comments of Baltimore Gas and Electric Company International Transmission Company, Docket No. PP-230-4 Out of Time Petition to Intervene and Comments of Baltimore Gas and Electric Company International Transmission Company, Docket No. PP-230-4 Out of Time Petition to Intervene and Comments of Baltimore Gas and Electric Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene and Comments Application for presidential permit OE Docket No. PP-230-4 International

74

FE-Docket No. 99-1: Petition to intervene of Calpine Power Services Company  

Broader source: Energy.gov (indexed) [DOE]

FE-Docket No. 99-1: Petition to intervene of Calpine Power Services FE-Docket No. 99-1: Petition to intervene of Calpine Power Services Company FE-Docket No. 99-1: Petition to intervene of Calpine Power Services Company Proposed open access requirement for international electric transmission facilities and delegation to the federal energy regulatory commission. Enclosed for filing are an original and fifteen copies of the petition to intervene of power service company in the above-captioned proceeding. FE-Docket No. 99-1: Petition to intervene of Calpine Power Services Company More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Campton Conservation Commission Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Petition to Intervene Out of Time and Comments of

75

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

American Municipal Power, American Municipal Power, Inc. and Old Dominion Electric Cooperative Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to American Municipal Power, Inc. and Old Dominion Electric Cooperative Answer of International Transmission Company to Late Petition to Intervene and for Additional Relief of American Municipal Power, Inc. and Old Dominion Electric Cooperative. on application for Presidential Permit OE Docket No. 230-4. PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Petition to Intervene and Request for Opportunity to Comment, American Municipal Power and Old Dominion Electric

76

Application to Amend Presidential Permit OE Docket No. PP-022-4 British  

Broader source: Energy.gov (indexed) [DOE]

Amend Presidential Permit OE Docket No. PP-022-4 Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78 - Apr. 24, 2007 Application to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78 - Apr. 24, 2007 Application from British Columbia Transmission Corporation to amend Presidential Permit to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border: Federal Register Notice Application to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice, Volume 72, No. 78 More Documents & Publications EXC-13-0004 - In the Matter of Liebherr Canada Ltd. PP-369 British Columbia Transmission Corporation and British Columbia Hydro

77

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Comments of the Supplemental Comments of the Independent Electricity System Operator Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Independent Electricity System Operator Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PP-230-4 Independent Electricity System Operator More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Reply Comments Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator Application for Presidential Permit OE Docket No. PP-230-4 International

78

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Late Motion to Intervene of Late Motion to Intervene of New York Transmission Owners Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene of New York Transmission Owners Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. Response to Late Motion to Intervene of New York Transmission Owners PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from FirstEnergy Service Corporation Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from PJM

79

Application for Presidential Permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Presidential Permit OE Docket No. PP-230-4 Presidential Permit OE Docket No. PP-230-4 International Transmission Co: Answer to NYISO from MISO and IESO Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Co: Answer to NYISO from MISO and IESO The Midwest Independent Transmission System Operator (MISO) and the Independent Electricity System Operator (IESO) submit joint comments in response to the intervene and request for comment by New York Independent System Operator (NYISO) regarding application from ITC to construct, operate and maintain electric transmission facilities at the U.S - Canada Border. Answer to NISO from MISO and IESO 10-13-11.pdf More Documents & Publications Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments and Supplemental Documents

80

Application for Presidential Permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Application for Presidential Permit OE Docket No. PP-230-4 Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Motion to Intervene and Comment on behalf of The Public Utilities Commission of Ohio Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Motion to Intervene and Comment on behalf of The Public Utilities Commission of Ohio Application from International Transmission Company to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. Motion to Intervene and Comments of The Public Utilities Comm. of Ohio.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Public Utilities Commission of Ohio

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

New York Independent New York Independent System Operator Inc Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the New York Independent System Operator Inc Comments of the New York Independent System Operator on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for presidential permit OE Docket No. PP-230-4 New York Independent System Operator Inc More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator Application for Presidential permit OE Docket No. PP-230-4 International

82

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

and Comments and Comments Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene and Comments Answer of International Transmission Company to late motions to intervene and comments of Baltimore Gas and Electric Company, American Electric Power, and Pepco Holdings, Inc. PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Out of Time Petition to Intervene and Comments of Baltimore Gas and Electric Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from FirstEnergy Service Corporation Application for presidential permit OE Docket No. PP-230-4 International

83

Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council  

SciTech Connect (OSTI)

This report, Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council (WECC), was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). The intent of WECC’s work was to identify planning-level energy corridors that the Department of Energy (DOE) and its affiliates could study in greater detail. Argonne was tasked by DOE to analyze the WECC Proposed Energy Corridors in five topic areas for use in reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. In compliance with Section 368 of the Energy Policy Act of 2005 (EPAct), the Secretaries of Energy, Agriculture, and the Interior (Secretaries) published a Programmatic Environmental Impact Statement in 2008 to address the proposed designation of energy transport corridors on federal lands in the 11 western states. Subsequently, Records of Decision designating the corridors were issued in 2009 by the Bureau of Land Management (BLM) and the U.S. Forest Service (USFS). The 2012 settlement of a lawsuit, brought by The Wilderness Society and others against the United States, which identified environmental concerns for many of the corridors requires, among other things, periodic reviews of the corridors to assess the need for revisions, deletions, or additions. A 2013 Presidential Memorandum requires the Secretaries to undertake a continuing effort to identify and designate energy corridors. The WECC Proposed Energy Corridors and their analyses in this report provide key information for reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. Load centers and generation hubs identified in the WECC analysis, particularly as they reflect renewable energy development, would be useful in reviewing and potentially updating the designated Section 368 corridor network. Argonne used Geographic Information System (GIS) technology to analyze the proposed energy corridors in the WECC report in five topic areas: ? Federal land jurisdiction, ? Existing Section 368 corridors, ? Existing transmission lines, ? Previously studied corridor locations, and ? Protected areas. Analysis methods are explained and tables and maps are provided to describe the results of the analyses in all five topic areas. WECC used a rational approach to connecting the hubs it identified, although there may be opportunities for adapting some of the proposed WECC routes to previously designated Section 368 corridors, for example: ? The WECC proposed energy corridors are in fact centerlines of proposed routes connecting hubs of various descriptions related to electric energy transmission. Although the centerlines were sited to avoid sensitive areas, infrastructure proposed within actual pathways or corridors defined by the centerlines would sometimes affect lands where such development would not normally be allowed, such as National Parks and Monuments, National Wildlife Refuges, and Wilderness Areas. ? Many WECC proposed energy corridors are sited along centerlines of existing roads, including Interstate Highways, where in some cases additional width to accommodate energy transmission infrastructure may not be available. Examples include the WECC Proposed Corridor along Interstate 70 through Glenwood Canyon in Colorado, and along U.S. Highway 89 across Glen Canyon Dam in Arizona. ? Several WECC proposed energy corridors are parallel to designated Section 368 corridors that have already cleared the preliminary steps to right-of-way approval. In many of these cases, the WECC hub connection objectives can be met more efficiently by routing on the designated Section 368 corridors.

Kuiper, James A.; Cantwell, Brian J.; Hlava, Kevin J.; Moore, H Robert; Orr, Andrew B.; Zvolanek, Emily A.

2014-02-24T23:59:59.000Z

84

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

from PJM Interconnection LLC from PJM Interconnection LLC Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from PJM Interconnection LLC Response from International Transmission Company to late motion to intervene from PJM Interconnection in the matter of the application for a presidential permit authorizing International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PP 230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from FirstEnergy Service Corporation Application for presidential permit OE Docket No. PP-230-4 International

85

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

0-4 0-4 International Transmission Company: Response to Late Motion to Intervene and Comments Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene and Comments Answer of International Transmission Company to late motions to intervene and comments of Baltimore Gas and Electric Company, American Electric Power, and Pepco Holdings, Inc. PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Out of Time Petition to Intervene and Comments of Baltimore Gas and Electric Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to American Municipal Power, Inc. and Old

86

Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific  

Broader source: Energy.gov (indexed) [DOE]

299 Sea Breeze 299 Sea Breeze Pacific Regional Transmission System Inc.: Federal Register Notice Volume 70, No. 33 - Feb. 18, 2005 Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System Inc.: Federal Register Notice Volume 70, No. 33 - Feb. 18, 2005 Application from Sea Breeze Pacific Regional Transmission System Inc to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. - Federal Register Notice Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System Inc More Documents & Publications Application for Presidential Permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System, INC EIS-0183: DOE Notice of Availability of the Record of Decision

87

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Petition to Intervene and Request for Petition to Intervene and Request for Opportunity to Comment, American Municipal Power and Old Dominion Electric Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Petition to Intervene and Request for Opportunity to Comment, American Municipal Power and Old Dominion Electric Petition to Intervene and Request for Opportunity to Comment on the application for presidential permit OE Docket No. PP-230-4 International Transmission Company made by American Municipal Power and Old Dominion Electric Petition to Intervene and Request for Opportunity to Commnet OE Docket No. PP-230-4 More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to American Municipal Power, Inc. and Old

88

Application for presidential permit OE Docket No. PP-305 Montana Alberta  

Broader source: Energy.gov (indexed) [DOE]

Federal Register Notice Volume 70, No. 210 - Nov. 1, 2005 Federal Register Notice Volume 70, No. 210 - Nov. 1, 2005 Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Federal Register Notice Volume 70, No. 210 - Nov. 1, 2005 Application from Montana Alberta Tie Ltd to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Federal Register Notice Vol 70 No 210. Application for presidential permit OE Docket No. 305 Montana Alberta Tie Ltd More Documents & Publications Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Update Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Scope Change #1 Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Notice to Intent to Prepare an Environmental Impact Statement and

89

Application for presidential permit OE Docket No. PP-362 Champlain Hudson:  

Broader source: Energy.gov (indexed) [DOE]

Application for presidential permit OE Docket No. PP-362 Champlain Application for presidential permit OE Docket No. PP-362 Champlain Hudson: Federal Register Notice Volume 75, No. 43 - Mar. 5, 2010 Application for presidential permit OE Docket No. PP-362 Champlain Hudson: Federal Register Notice Volume 75, No. 43 - Mar. 5, 2010 Application from Champlain Hudson to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Federal Register Notice Volume 75, No. 43 PP-362 Champlain Hudson Power Express Inc, Federal Register Notice Volume 75, No. 43 More Documents & Publications Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc. Application for presidential permit OE Docket No. PP-362 Champlain Hudson Power Express Inc 2012 Annual Planning Summary for Electricity Delivery and Energy

90

Application for Presidential Permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Motion to Intervene and Comment on Motion to Intervene and Comment on behalf of The Public Utilities Commission of Ohio Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Motion to Intervene and Comment on behalf of The Public Utilities Commission of Ohio Application from International Transmission Company to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. Motion to Intervene and Comments of The Public Utilities Comm. of Ohio.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Public Utilities Commission of Ohio Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene and Comments

91

Application for presidential permit OE Docket No. PP-334 Energia Sierra  

Broader source: Energy.gov (indexed) [DOE]

presidential permit OE Docket No. PP-334 Energia presidential permit OE Docket No. PP-334 Energia Sierra Juarex U.S Transmission LLC - Notice of Intent To Prepare an Environmental Impact Statement: Federal Register Volume 74, No. 36 - Feb. 25, 2009 Application for presidential permit OE Docket No. PP-334 Energia Sierra Juarex U.S Transmission LLC - Notice of Intent To Prepare an Environmental Impact Statement: Federal Register Volume 74, No. 36 - Feb. 25, 2009 Application from Energia Sierra Juarex U.S Transmission LLC to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border. Federal Register Notice of intent to prepare an environmental impact statement on the application. Federal Register Vol 74 No 36 PP-334 Energia Sierra Juarex U.S Transmission LLC More Documents & Publications

92

Application for presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC  

Broader source: Energy.gov (indexed) [DOE]

presidential permit OE Docket No. PP-230-2 and presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC Holdings Corporation Limited Partnership, International Transmission Company, and DTE Energy Company Application for presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC Holdings Corporation Limited Partnership, International Transmission Company, and DTE Energy Company Applicatio from ITC Holdings Corporation Limited Partnership, International Transmission Company, and DTE Energy Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC Holdings Corporation Limited Partnership, International Transmission Company, and DTE Energy Company More Documents & Publications

93

Application for Presidential Permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Filing - Extension of Supplemental Filing - Extension of Comments: Federal Register Notice Volume 76, No. 204 - Oct. 21, 2011 Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Filing - Extension of Comments: Federal Register Notice Volume 76, No. 204 - Oct. 21, 2011 Request to extend the comment period on its supplemental filing on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S.-Canada border. PP-230-4_SupplementalFiling_ExtensionofCommentPeriod10-21.pdf More Documents & Publications Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments and Supplemental Documents Application for Presidental Permit OE Docket No. PP-230-4 International

94

Application for Presidential Permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Company - Notice of Supplemental Filing: Federal Company - Notice of Supplemental Filing: Federal Register Notice Volume 76, No. 164 - Aug. 24, 2011 Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company - Notice of Supplemental Filing: Federal Register Notice Volume 76, No. 164 - Aug. 24, 2011 Notice of Supplemental filing on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. PP-230-4_SupplementalFiling.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Filing - Extension of Comments: Federal Register Notice Volume 76, No. 204 - Oct. 21, 2011 Application for Presidental Permit OE Docket No. PP-230-4 International

95

Application for Presidential Permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Comments of the Public Utilities Comments of the Public Utilities Commission of Ohio Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Public Utilities Commission of Ohio Comments of the PUCO on the application from Internation Transmission Company to construct, operate, and maintain electric transmision facilities at the U.S-Canada border. Motion to Intervene and Comments of Public Utilities Comm. of Ohio 5-27-11.pdf More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the New York Independent System Operator Inc Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Independent Electricity System

96

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Response of PJM Interconnection, L.L.C. Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company PP-230-4 Response of PJM Interconnection, L.L.C. to Answer of International

97

Transmission  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

98

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

TEP Sahuarita-Nogales Transmission Line Final EIS TEP Sahuarita-Nogales Transmission Line Final EIS 2-4 Figure 2.1-1. Close-up of Alternative Study Corridors Near Sahuarita and Green Valley. Chapter 2- Proposed Action and Alternatives 2-5 Figure 2.1-2. Close-up of Alternative Study Corridors Near Amado. TEP Sahuarita-Nogales Transmission Line Final EIS 2-6 Figure 2.1-3. Close-up of Alternative Study Corridors Near Nogales. TEP Sahuarita-Nogales Transmission Line Final EIS 2-8 Figure 2.1-4. Western Corridor on the Coronado National Forest. Chapter 2-Proposed Action and Alternatives 2-13 Figure 2.1-5. Central Corridor on the Coronado National Forest. Chapter 2-Proposed Action and Alternatives 2-15 Figure 2.1-6. Crossover Corridor on the Coronado National Forest. TEP Sahuarita-Nogales Transmission Line Final EIS

99

Application for presidential permit OE Docket No. PP-371 Northern Pass  

Broader source: Energy.gov (indexed) [DOE]

Application for presidential permit OE Docket No. PP-371 Northern Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Public Scoping Period Reopened: Federal Register Volume 73, No. 183 - Jun. 15, 2011 Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Public Scoping Period Reopened: Federal Register Volume 73, No. 183 - Jun. 15, 2011 The U.S. Department of Energy reopened the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS). NP_ScopingExtension_061511.pdf More Documents & Publications EIS-0463: Extension of Scoping Period Federal Register Notice: National Nuclear Security Administration Site-Wide Environmental Impact Statement for Sandia National Laboratories, New Mexico (SNL/NM) EIS-0426: Notice of Extension of Comment Period

100

Application for presidential permit OE Docket No. PP-371 Northern Pass  

Broader source: Energy.gov (indexed) [DOE]

Application for presidential permit OE Docket No. PP-371 Northern Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Public Scoping Period Reopened: Federal Register Volume 73, No. 183 - Jun. 15, 2011 Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Public Scoping Period Reopened: Federal Register Volume 73, No. 183 - Jun. 15, 2011 The U.S. Department of Energy reopened the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS). NP_ScopingExtension_061511.pdf More Documents & Publications EIS-0463: Extension of Scoping Period Federal Register Notice: National Nuclear Security Administration Site-Wide Environmental Impact Statement for Sandia National Laboratories, New Mexico (SNL/NM) EIS-0466: Re-opening of Public Scoping Period and Announcement of

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Response to Late Motion to Intervene Response to Late Motion to Intervene from FirstEnergy Service Corporation Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from FirstEnergy Service Corporation Response from International Transmission Company to late motion to intervene from FirstEnergy Service Corporation in the matter of the application for a presidential permit authorizing International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene of New York

102

Geologic selection methodology for transportation corridor routing  

E-Print Network [OSTI]

Corridor Evaluation Area. 3 Location of Counties Studied in Corridor Project 4 Climatic Zones of Texas . 5 State of Texas Average Annual Precipitation Values, in Inches, . . . 6 State of Texas Average Annual Runoff Values, in Inches... Borehole 6: Waco City. . 36 Borehole 7: Bexar County . 37 Borehole 8: Bexar County 38 Route Alternatives in Corridor Area. 39 Cost Matrix for Project Area . . 40 Risk Matrix for Project Area . . 41 Geo-Economic Construction Costs. . . 85 . . 88 100...

Shultz, Karin Wilson

2012-06-07T23:59:59.000Z

103

River Corridor Closure Project Partnering Performance Agreement...  

Office of Environmental Management (EM)

- March 2009 Voluntary Protection Program Onsite Review, River Corridor Closure Project - June 2012 Indoctrinating Subcontractors into the DOE Safety Culture and Expectations...

104

Application for Presidential permit OE Docket No. PP-371 Northern Pass  

Broader source: Energy.gov (indexed) [DOE]

Presidential permit OE Docket No. PP-371 Northern Presidential permit OE Docket No. PP-371 Northern Pass Transmission: Comments and Requests for Intervention Received on the Amended Application Application for Presidential permit OE Docket No. PP-371 Northern Pass Transmission: Comments and Requests for Intervention Received on the Amended Application PP-371 Comments from Lee Ann Moulder 08/25/13 Comments from Pamela Martin 08/25/13 Comments from Elisha Gray 08/26/13 Comments from Larry Rappaport 08/26/13 Comments from Michael Marino 08/26/13 Comments from Robert Martin 08/26/13 Comments from Linda Upham 09/02/13 Comments from City of Concord 09/20/13 Comments from The Weeks Lancaster Trust 09/12/13 Comments from Campton Conservation Commission 09/13/13 Comments from Bruce Adami 09/16/13 Comments from Anne Moschella 09/16/13

105

Application for presidential permit OE Docket No. PP-234 Baja...  

Broader source: Energy.gov (indexed) [DOE]

presidential permit OE Docket No. PP-234 Baja California Power, Inc Application for presidential permit OE Docket No. PP-234 Baja California Power, Inc Application from Baja...

106

Ex parte communication of the California Energy Commission- Docket...  

Energy Savers [EERE]

parte communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 Ex parte communication of the California Energy Commission- Docket No....

107

Agencies Publish Final Environmental Impact Statement On Energy Corridor  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement On Energy Final Environmental Impact Statement On Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement On Energy Corridor Designation in the West Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. Agencies Publish Final Environmental Impact Statement On Energy Corridor Designation in the West More Documents & Publications Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States, November 8, 2007 Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007.

108

Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc.: Record of Decision for Issuing a Presidential Permit for the CHPE Transmission Line Project: Federal Register Notice, Volume 79, No. 190- Oct. 1, 2014  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) announces its decision to issue a Presidential permit to Champlain Hudson Power Express, Inc. (CHPEI), to construct, operate, maintain, and connect an electric transmission line across the U.S./Canada border in the northeastern New York State.

109

Comments of New England Electric Transmission Corporation on Proposed Open  

Broader source: Energy.gov (indexed) [DOE]

New England Electric Transmission Corporation on New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Motion to intervene out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and New England Power Company. Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities FE Docket No 99-1 (PP-76/EA-76) More Documents & Publications Ontario Power Generation Motion to Intervene & Comments in FE Docket No.

110

Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Pennsylvania's Ethanol Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons to someone by E-mail Share Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Facebook Tweet about Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Twitter Bookmark Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Google Bookmark Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Delicious Rank Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Digg Find More places to share Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on

111

Alternative Fuels Data Center: Provision for Alternative Fuels Corridor  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Provision for Provision for Alternative Fuels Corridor Pilot Projects to someone by E-mail Share Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Facebook Tweet about Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Twitter Bookmark Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Google Bookmark Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Delicious Rank Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Digg Find More places to share Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on AddThis.com... More in this section... Federal

112

Application for presidential permit OE Docket No. PP-305 Montana Alberta  

Broader source: Energy.gov (indexed) [DOE]

Notice to Intent to Prepare an Environmental Impact Notice to Intent to Prepare an Environmental Impact Statement and Conduct Scoping Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Notice to Intent to Prepare an Environmental Impact Statement and Conduct Scoping The Department of Energy (DOE) announces its intention to prepare an EIS and to conduct scoping on the proposed Federal action of granting a Presidential Permit to construct a new electric transmission line across the U.S.-Canada border in northwestern Montana. OE Docket No. PP-305 Notice to Intent to Prepare an Environment Impact Statement and Conduct Scoping: Montana Alberta Tie, Ltd. More Documents & Publications Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Scope Change #1

113

Application for presidential permit OE Docket No. PP-362 Champlain Hudson -  

Broader source: Energy.gov (indexed) [DOE]

presidential permit OE Docket No. PP-362 Champlain presidential permit OE Docket No. PP-362 Champlain Hudson - Notice of Intent To Prepare an Environmental Impact Statement: Federal Register Notice Volume 75, No. 117 - Jun. 18, 2010 Application for presidential permit OE Docket No. PP-362 Champlain Hudson - Notice of Intent To Prepare an Environmental Impact Statement: Federal Register Notice Volume 75, No. 117 - Jun. 18, 2010 Application from Champlain Hudson to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Federal Register Notice of intent to prepare an environmental impact statement on the application. Federal Register Vol 75 No 117 PP-362 Champlain Hudson Power Express Inc More Documents & Publications EIS-0447: Notice of Intent to Prepare an Environmental Impact Statement and

114

Application to Export Electric Energy OE Docket No. EA-354 Endure Energy,  

Broader source: Energy.gov (indexed) [DOE]

4 Endure 4 Endure Energy, L.L.C.: Federal Register Notice Volume 74, No. 105 - Jun. 3, 2009 Application to Export Electric Energy OE Docket No. EA-354 Endure Energy, L.L.C.: Federal Register Notice Volume 74, No. 105 - Jun. 3, 2009 Application from Endure Energy, L.L.C. to export electric energy to Canada. Federal Register Notice Vol 74 No 105 EA-354 Endure Energy, L.L.C. More Documents & Publications EIS-0399: Notice of Intent to Prepare an Environmental Impact Statement Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System Inc.: Federal Register Notice Volume 70, No. 33 - Feb. 18, 2005 Application to Export Electric Energy OE Docket No. EA-298 ISO New England Inc.: Federal Register Notice Volume 69, No. 218 - Nov. 12, 2004

115

Ontario Power Generation Motion to Intervene & Comments in FE Docket No.  

Broader source: Energy.gov (indexed) [DOE]

Ontario Power Generation Motion to Intervene & Comments in FE Ontario Power Generation Motion to Intervene & Comments in FE Docket No. 99-1 Ontario Power Generation Motion to Intervene & Comments in FE Docket No. 99-1 Ontario Power Generation hereby moves to intervene in, and comments on, the DOE's proposed open access requirements for International Electric Transmission Facilities. Ontario Power Company Motion to Intervene & Comments in FE Docket No. 99-1 More Documents & Publications Motion to Intervene and Comments of Public Utility District No. 1 (Pend Oreille County, Washington) on PP 99-1 Notice of Intent to Amend Presidential Permit Motion to intervene and comments of the energy services group of Hydro-Quebec and H.Q. Energy Services (U.S.) Inc, on FE 99-1 Joint Motion to Intervene of Northern States Power Company (Minnesota) et

116

Application for presidential permit OE Docket No. PP-362 Champlain Hudson:  

Broader source: Energy.gov (indexed) [DOE]

362 Champlain 362 Champlain Hudson: Federal Register Notice Volume 75, No. 43 - Mar. 5, 2010 Application for presidential permit OE Docket No. PP-362 Champlain Hudson: Federal Register Notice Volume 75, No. 43 - Mar. 5, 2010 Application from Champlain Hudson to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Federal Register Notice Volume 75, No. 43 PP-362 Champlain Hudson Power Express Inc, Federal Register Notice Volume 75, No. 43 More Documents & Publications Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc. EIS-0447: Amended Notice of Intent to Prepare an Environmental Impact Statement Application for presidential permit OE Docket No. PP-362 Champlain Hudson Power Express Inc

117

Corridor Length and Patch Colonization by a Butterfly, Junonia coenia  

SciTech Connect (OSTI)

Study hypothesized that corridors increase patch colonization by Junonia coenia regardless of insects initial distance from patch, as the butterfly is known to move between patches preferentially through corridors. Neither corridor nor distance had significant effect on patch colonization, but significant interaction between presence or absence of corridors and distance. One critical factor is interpatch distance which may determine the relative effectiveness of corridors and other landscape configurations.

Haddad, N.

1999-01-22T23:59:59.000Z

118

EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and  

Broader source: Energy.gov (indexed) [DOE]

36: I-5 Corridor Reinforcement Project, Multnomah County, 36: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington SUMMARY This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Wash., to a new 500-kV substation near Troutdale, Ore. After initially identifying a large number of route segments, BPA combined those segments into four action alternatives (each with options): West, Central, East, and Crossover. The action alternatives and the No Action Alternative are analyzed in the draft EIS. The alternatives vary in length and include both existing and new

119

EIS-0490: Boulder City/U.S. 93 Corridor Transportation Improvements,  

Broader source: Energy.gov (indexed) [DOE]

490: Boulder City/U.S. 93 Corridor Transportation 490: Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder County, Nevada EIS-0490: Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder County, Nevada SUMMARY The Federal Highway Administration and the Nevada Department of Transportation prepared an EIS to evaluate the potential environmental impacts of the proposed Boulder City/U.S. 93 Bypass Project in Boulder County, Nevada. DOE's Western Area Power Administration, a cooperating agency, adopted the Final EIS and issued a Record of Decision to modify Western's transmission system and facilities to accommodate the construction of the project. The project website is http://www.nevadadot.com/Micro-Sites/BoulderCityBypass/The_Boulder_City_Bypass.aspx. PUBLIC COMMENT OPPORTUNITIES

120

PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES  

Broader source: Energy.gov [DOE]

Designed to promote energy efficiency in buildings in Phoenix, Arizona’s 10-mile-long Light Rail Corridor, Energize Phoenix focused on performing energy upgrades and reducing energy use in...

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

BPA releases I-5 Corridor Reinforcement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RELEASE Tuesday, Nov. 13, 2012 CONTACT: Doug Johnson, 503-230-5840 or 503-230-5131 BPA releases I-5 Corridor Reinforcement Project Draft EIS and preferred alternative...

122

CERTIFICATION DOCKET WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT  

Office of Legacy Management (LM)

WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects ..-.. --__- _".-.-l--_--l -_._ _- --- ~~~. . ..~ CONTENTS Page - - I NTRODUCTI ON 1 Purpose 1 Docket Contents 1 Exhibit I: Summary of Activities at Westinghouse Atomic Power Development Plant, East Pittsburgh Plant, Forest Hills, Pittsburgh, Pennsylvania I-l Exhibit II: Documents Supporting the Certification of Westinghouse Atomic Power Development Plant, East Pittsburgh Plant, Forest Hills, Pittsburgh, Pennsylvania iii II-1 . . .- .__.^ I ^_... _.-__^-____-. - CERTIFICATION DOCKET WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT

123

BPA, Transmission, proposed I-5 Corridor Reinforcement Project...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

dropped from consideration no longer appear on the map (segments 27, 31, 42 and 44). Substation sites BPA is now considering three sites for a new substation near Castle Rock,...

124

BPA, Transmission, I-5 Corridor Reinforcement, scoping meeting...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

line from a new substation near Castle Rock WA to a near Castle Rock, WA to a new substation near Troutdale, OR. BPA is proposing route segments that will be refined into...

125

BPA, Transmission, I-5 Corridor Reinforcement Project, August...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

near Castle Rock, Cowlitz County, Washington, to a new substation near BPA's Troutdale Substation, Troutdale, Multnomah County, Oregon (see enclosed map). Background BPA is a...

126

BPA, Transmission, I-5 Corridor Reinforcement Project factsheet...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

near Castle Rock, Wash., and Troutdale, Ore. The new line would be about 70 miles long. BPA has identified four route alternatives. Each includes a new substation near Castle...

127

BPA, Transmission, I-5 Corridor Reinforcement Project, February...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

could help relieve congestion in the Longview area, eliminate the need for a new substation at Castle Rock, and allow BPA to move the northern terminus of the line to the...

128

BPA, Transmission, I-5 Corridor Reinforcement Project, Project...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for this project, we have defined four route alternatives by combining route segments and substation sites. We are sharing this information with you now, because we expect to refer...

129

BPA, Transmission, I-5 Corridor Reinforcement Project, November...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft tower, line locations available BPA has released its preliminary designs showing tower and right-of-way locations. Information is now available online, allowing landowners to...

130

BPA, Transmission, I-5 Corridor Reinforcement Project, January...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

soon as possible. The decision document is available on the I-5 Project website at www.bpa.govgoi5. Non-wire measures won't delay route analysis As plans take shape to address...

131

BPA, Transmission, I-5 Corridor Reinforcement Project, list of...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

* Lewis and Clark College, Paul L. Boley Law Library * Portland State University, Branford P. Millar Library * Multnomah County Library (central) Troutdale - Troutdale Library...

132

BPA, Transmission, I-5 Corridor Reinforcement Project, Alternatives...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

s Vancouver Longview Portland Castle Rock Ostrander Minnehaha Salmon Creek Camas Troutdale Battle Ground Ridgefield Woodland Saint Helens 36 T S 46 38 45 37 47 4 B 36A 41 23 W...

133

BPA Transmission, I-5 Corridor Reinforcement Project Scoping...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

like segment 31 have existing easements and well maintained streets for access and repair. 3. You could modify segment 30 so that it is pushed Eastward by 1 mile. You would...

134

2006 National Electric Transmission Congestion Study | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study 6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor). Based on the 2006 study, two National Interest Electric Transmission Corridors were designated in 2007. These were invalidated by a federal appeals court in

135

National Electric Transmission Congestion Studies  

Broader source: Energy.gov [DOE]

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to include in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmission capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor).

136

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Idaho, the state's siting authority is limited to siting approvals on state property, and high voltage transmission lines (115kV or greater) within a National Interstate Electric Transmission Corridor (NIETC). Under these circumstances a Route Permit would be required by the Idaho Public Utilities Commission (IPUC); however, no such corridors have been designated and therefore the process has not been tested. Local governments

137

Interstate Clean Transportation Corridor Project Under Way  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

rucks that travel in the western rucks that travel in the western United States will soon be able to operate clean-burning alternative fuel vehicles (AFVs) along the Interstate Clean Transpor- tation Corridor (ICTC). The ICTC project is the first effort to develop clean transportation corridors to connect Los Angeles, San Bernar- dino, the San Joaquin Valley, Sacra- mento/San Francisco, Salt Lake City, Reno, and Las Vegas along routes 1-15, 1-80, and 1-5/CA-99. The ICTC team, headed by California- based Gladstein and Associates, plans to have commitments by early 1997 for 10 to 15 fueling sites located approximately 180 miles apart. These sites will serve 250 new heavy-duty AFVs and 500 local delivery vehicles. Their fuels will displace 4.7 million gallons of petroleum and mitigate more than

138

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

Conservation Law Foundation, Appalachian Mountain Club, and Society for the Protection of New Hampshire Forests Application for Presidential Permit OE Docket No. PP-371 Northern...

139

Application for Presidential Permit OE Docket No. PP-400 TDI...  

Broader source: Energy.gov (indexed) [DOE]

Project - Comments and Motion to Intervene of Conservation Law Foundation Application for Presidential Permit OE Docket No. PP-400 TDI-NE - New England Clean Power Link Project -...

140

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

Correction Application for Presidential Permit OE Docket No. PP-387 Soule River Hydroelectric Project; Federal Register Notice, Volume 78, No. 154 - Aug. 9, 2013: Correction...

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

July 30, 2013 Application for Presidential Permit OE Docket No. PP-387 Soule River Hydroelectric Project: Federal Register Notice, Volume 78, No. 146 - July 30, 2013 Application...

142

CERTIFICATION DOCKET FOR THE FORMER KELLEX CORPORATION JERSEY...  

Office of Legacy Management (LM)

DOCKET FOR THE FORMER KELLEX CORPORATION JERSEY CITY, NEW JERSEY DEPARTMENT OF ENERGY OFFICE OF NUCLEAR ENERGY OFFICE OF TERMINAL WASTE DISPOSAL AND REMEDIAL ACTION...

143

Application for presidential permit OE Docket No. PP-371 Northern Pass  

Broader source: Energy.gov (indexed) [DOE]

LLC LLC Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC Pursuant to Executive Order (EO) No. 10485, as amended by EO 12038, and 10 C.F.R. § 205.320 et seq., Northern Pass Transmission LLC (Northern Pass or the Applicant) hereby applies to the United States Department of Energy (DOE) for a Presidential Permit authorizing the construction, connection, operation, and maintenance of facilities for the transmission of electric energy at the international border between the United States and Canada. This application does not seek authority for any export of power from the United States. The information that follows is submitted in support of the Application. APPLICATION OF NORTHERN PASS TRANSMISSION LLC FOR PRESIDENTIAL PERMIT

144

Amended Application for Presidential Permit OE Docket No: PP-371 Northern  

Broader source: Energy.gov (indexed) [DOE]

LLC LLC Amended Application for Presidential Permit OE Docket No: PP-371 Northern Pass Transmission LLC Northern Pass Transmission LLC (Northern Pass) has submitted an amended application for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the United States border with Canada. Amended Application of Northern Pass Transmission LLC for Presidential Permit Exhibit 1 - Opinion of Counsel Exhibit 2 - General Area Map of Proposed Route Exhibit 3 - Diagrams of Cross-Section of Underground Cables Exhibit 4 - Drawings of Typical Structure Configurations Exhibit 5 - Chart of Proposed Structure Heights Exhibit 6 - Drawing of Typical Converter Terminal Exhibit 7 - General Area Map of North Section Exhibit 8 - General Area Map of Central Section

145

Amended Application for Presidential Permit OE Docket No: PP-371 Northern  

Broader source: Energy.gov (indexed) [DOE]

LLC: Federal Register Notice, Volume 78, No. 160 LLC: Federal Register Notice, Volume 78, No. 160 - August 19, 2013 Amended Application for Presidential Permit OE Docket No: PP-371 Northern Pass Transmission LLC: Federal Register Notice, Volume 78, No. 160 - August 19, 2013 Northern Pass Transmission LLC (Northern Pass) has submitted an amended application for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the United States border with Canada. PP-371 Amended Northern Pass Transmission FRN More Documents & Publications EIS-0431: Extension of Public Comment Period Amended Notice of Intent To Modify the Scope of the EIS and Conduct Additional Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement for the Northern Pass Project: Federal Register Notice VOlume

146

Cleaning Up the Hanford River Corridor and Improving Site Operations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

operations * Continue River Corridor cleanup, including remediation of 618-10 Burial Ground * Continue Plutonium Finishing Plant deactivation, decommissioning and demolition *...

147

Department of Energy Awards Hanford River Corridor Contract To...  

Energy Savers [EERE]

Corridor." Media contact: Mike Waldron, 202586-4940 Addthis Related Articles Hanford Landfill Reaches 15 Million Tons Disposed - Waste Disposal Mark Shows Success Cleaning Up...

148

.,~ .\\DOCKET . 1'-frA-e1Z--L  

E-Print Network [OSTI]

include an additional requirement of a minimum standard for power factor. The proposed efficiency.,~ .\\DOCKET . 1'-frA-e1Z--L DATE ,STATE OF CALIFORNIA REeD.JAN 1'l l012 ENERGY RESOURCES CONSERVATION AND DEVELOPMENT COMMISSION Appliance Efficiency Regulations ) ) ) Docket No. ll-AAER-2 Order

149

Using regulations.gov to find dockets and documents  

Broader source: Energy.gov (indexed) [DOE]

regulations.gov to find dockets and documents regulations.gov to find dockets and documents Regulations.gov is a web-based repository of Federal regulatory documents. Publicly accessible documents associated with DOE Appliance and Equipment Standards rulemakings and related Federal Register notices are now accessible on regulations.gov On regulations.gov, you can: View Proposed and Final Rules and other regulatory documents or notices Read public comments, as well as public meeting presentations and transcripts These documents are part of a docket folder, which contains all documents associated with a particular rulemaking or notice. All current (and most historical) Appliance and Equipment Standards rulemakings have dockets in regulations.gov. You can access a docket via the rulemaking page on the Appliance and Equipment

150

Application for Presidental Permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Filing - Extension of Supplemental Filing - Extension of Comments: Federal Register Notice Volume 76, No. 187 - Sep. 27, 2011 Application for Presidental Permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Filing - Extension of Comments: Federal Register Notice Volume 76, No. 187 - Sep. 27, 2011 Request to extend the comment period on its supplemental filing on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S.-Canada border. PP-230-4_SupplementalFiling_ExtensionofCommentPeriod_9-27.pdf More Documents & Publications Electricity Advisory Committee Notice of Open Meeting October 2 and 3, 2013: Federal Register Notice Volume 78, No. 176 - September 11, 2013 Electricity Advisory Committee Notice of Open Meeting October 19 and 20,

151

Department of Energy Awards Hanford River Corridor Contract To Washington  

Broader source: Energy.gov (indexed) [DOE]

Hanford River Corridor Contract To Hanford River Corridor Contract To Washington Closure, LLC Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis WASHINGTON, DC - U.S. Energy Secretary Samuel Bodman today announced that Washington Closure, LLC has been awarded the contract to manage the clean up and remediation of the Columbia River Corridor at the Department of Energy's Hanford Reservation in the state of Washington. The five-member team includes the Washington Group International Inc., Bechtel National Inc., CH2M Hill Inc., Eberline Services Inc., and Integrated Logistics Services Inc. The Columbia River Corridor is composed of roughly 210 square miles along the outer edge of the Hanford Site. The contract calls for cleaning up and

152

An Inside Look at River Corridor | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

An Inside Look at River Corridor An Inside Look at River Corridor An Inside Look at River Corridor July 16, 2012 - 1:04pm Addthis "River Corridor" provides viewers with a look at the cleanup of hundreds of contaminated buildings and more than one thousand areas where soil was contaminated along the 50-mile stretch of the Columbia River that flows through the Hanford Site in southeast Washington State. Amanda Scott Amanda Scott Former Managing Editor, Energy.gov In the seventh chapter of The Handford Story, the Energy Department takes a look at the River Corridor -- a 50-mile stretch of the Columbia River that flows through the Hanford site in southeast Washington State. This video provides you with an insiders look at the cleanup of contaminated buildings and soil. Watch the video above to get a look inside the Energy

153

Wabash River Heritage Corridor (Indiana) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Wabash River Heritage Corridor (Indiana) Wabash River Heritage Corridor (Indiana) Wabash River Heritage Corridor (Indiana) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor Industrial Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 1991 State Indiana Program Type Siting and Permitting Provider Wabash River Heritage Corridor Commission The Wabash River Heritage Corridor, consisting of the Wabash River, the Little River, and the portage between the Little River and the Maumee

154

Department of Energy Awards Hanford River Corridor Contract To Washington  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Awards Hanford River Corridor Contract To Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis WASHINGTON, DC - U.S. Energy Secretary Samuel Bodman today announced that Washington Closure, LLC has been awarded the contract to manage the clean up and remediation of the Columbia River Corridor at the Department of Energy's Hanford Reservation in the state of Washington. The five-member team includes the Washington Group International Inc., Bechtel National Inc., CH2M Hill Inc., Eberline Services Inc., and Integrated Logistics Services Inc. The Columbia River Corridor is composed of roughly 210 square miles along the outer edge of the Hanford Site. The contract calls for cleaning up and

155

Digging Begins at Hazardous Hanford Burial Ground - River Corridor  

Broader source: Energy.gov (indexed) [DOE]

Digging Begins at Hazardous Hanford Burial Ground - River Corridor Digging Begins at Hazardous Hanford Burial Ground - River Corridor Contractor Spent Two Years Preparing to Remediate 618-10 Digging Begins at Hazardous Hanford Burial Ground - River Corridor Contractor Spent Two Years Preparing to Remediate 618-10 August 3, 2011 - 12:00pm Addthis Media Contacts Cameron Hardy, DOE Cameron.Hardy@rl.doe.gov 509-376-5365 Todd Nelson, Washington Closure media@wch-rcc.com 509-372-9097 RICHLAND, WASH. - After careful preparation and characterization, the Department of Energy's (DOE) River Corridor contractor, Washington Closure Hanford, has begun remediation of one of the most hazardous burial grounds tackled to date on the Hanford Site's River Corridor. The $57 million American Recovery and Reinvestment Act project began with nearly two years of preparation and characterization before reaching their

156

CERTIFICATION DOCKET FOR BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK  

Office of Legacy Management (LM)

BETHLEHEM STEEL CORPORATION BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK Department of Energy Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects CONTENTS Introduction to the Certification Docket for Bethlehem Steel Corporation, Lackawanna, New York Purpose Docket Contents Exhibit I: Summary of Activities at the Bethlehem Steel Corporation, Lackawanna, New York Exhibit II: Documents Supporting the Certification of the Bethlehem Steel Corporation, Lackawanna, New York Page 1 1 2 I-l II- 1 _- . . . 111 Certification Docket Bethlehem Steel Corporation Lackawanna, New York Introduction The Department of Energy (DOE), Office of Nuclear Energy, Office of Terminal Waste Disposal and Remedial Action, Division of Remedial Action

157

CERTIFICATION DOCKET ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLVANIA  

Office of Legacy Management (LM)

$f $f 2 .A , :j. 1' q CERTIFICATION DOCKET ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLVANIA - Department of Energy Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects x- ,m._- ~-____- -.. - CONTENTS - INTRODUCTION Purpose Docket Contents Exhibit I: Summary'of Activities at Rohm & Haas Company, Philadelphia, Pennsylvania Exhibit II: Documents Supporting the Certification of the Rohm & Haas Company, Philadelphia, Pennsylvania iii Page 1 1 1 I-l II-1 .--1----- .",. -._ _ . . - INTRODUCTION TO CERTIFICATION DOCKET ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLVANIA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Terminal Waste Disposal and Remedial Action Projects has reviewed

158

Idaho/Transmission/State Regulations | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State Siting Process The State's direct authority to site high-voltage transmission lines is limited to transmission lines located within National Interstate Electric Transmission Corridors (NIETC); however, no NIETCs currently exist within Idaho so the authority has not been put into practice. Siting authority belongs to local governments or federal agencies that manage the land where the proposed transmission line would be located. Public utilities that

159

2009 Electric Transmission Congestion Study | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9 Electric Transmission Congestion Study 9 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

160

2009 Electric Transmission Congestion Study | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Corridors and some ecological and evolutionary consequences of connectivity.  

SciTech Connect (OSTI)

Abstract - By connecting disjunct patches, corridors may offset the effects of fragmentation by promoting gene flow and population persistence. However, the ultimate effect of corridors on a focal species may hinge upon two considerations: how corridors may affect ecological interactions that impinge upon that species, and how corridors might affect the fixation of novel alleles that ultimately determine fitness and persistence. Using an experimental landscape, I show that corridor-mediated changes in patch shape change seed predation in connected and unconnected patches, and shift the behavior, abundance, and distribution of seed predators. Rodent seed predators removed more seeds in connected patches, arthropod seed predators removed more seeds in rectangular patches, and avian seed predation did not differ due to patch type. Rodent foraging was greater in the interior of connected patches because changes in patch shape influenced risk perceived by rodents while foraging. Ant communities were also affected by changes in patch shape caused by corridors, rather than corridor effects per se. The distribution and abundance of ants differed among edge-rich areas (corridors and wings), edges, and the patch interior. In rectangular patches, fire ants (Solenopsis spp.) had negative impacts on other ant species. By changing the activity of rodents, and the composition of ant communities, corridors may have important impacts on seeds. Bird-dispersed seeds may benefit from increased dispersal among connected patches, but connected patches also have greater predation risk. Using a simulation model, I demonstrate that gene flow between a stable population and a population that experiences local extinction or a reduction in size (e.g. due to natural or anthropogenic disturbance) can dramatically affect fixation of alleles in the stable population. Alone or in concert, frequent disturbance, high rates of movement, and low habitat quality make it more likely that connectivity-mediated fixation will promote fixation of harmful alleles and reduce fixation of beneficial alleles.

Orrock, John L

2004-07-01T23:59:59.000Z

162

Dockets Open for Public Comment | Department of Energy  

Energy Savers [EERE]

on how to submit your comments. Gasfin Development USA, LLC - FE Docket No. 13-161-LNG Application for Long-Term Authorization To Export Liquefied Natural Gas Produced From...

163

Application for presidential permit OE Docket No. PP-371 Northern Pass  

Broader source: Energy.gov (indexed) [DOE]

Letter of MOU Cancellation Letter of MOU Cancellation Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Letter of MOU Cancellation March 7, 2011 Northern Pass Transmission LLC appreciates the cooperation of the Department of Energy ("DOE") in negotiating the Memorandum of Understanding ("MOU") among DOE, Northern Pass and Normandeau Associates Inc. We nevertheless have concluded that it is desirable to terminate the MOU and the role of Normandeau Associates in the environmental impact statement ("EIS") process so that the EIS can be prepared free of the public concerns that have been voiced. We therefore request DOE's agreement to terminate the MOU and the role of Normandeau Associates as DOE's EIS contractor at this early stage of the process so that the EIS

164

Agencies Publish Final Environmental Impact Statement on Energy Corridor  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement on Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 4:58pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The Department of the Interior's Bureau of Land Management and the U.S. Departments of Energy, Agriculture, and Defense (the Agencies) prepared the Final PEIS as part of their work to implement Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines, as well as electricity

165

Agencies Publish Final Environmental Impact Statement on Energy Corridor  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement on Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 2:07pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The Department of the Interior's Bureau of Land Management and the U.S. Departments of Energy, Agriculture, and Defense (the Agencies) prepared the Final PEIS as part of their work to implement Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines, as well as electricity

166

The opportunistic green : building on Toronto's utility corridor  

E-Print Network [OSTI]

The Green Line or hydro corridors of Toronto are sprawling lengths of continuous, mostly vacant land used for the primary purpose of transmitting electricity. They are unusual terrain, physically sparse but culturally ...

Rahimi, Kamyar

2014-01-01T23:59:59.000Z

167

River Corridor Baseline Risk Assessment (RCBRA) Human Health...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by end of year Status of River Corridor Risk Assessments 2 RCBRA will be used in CERCLA Remedial InvestigationFeasibility Study (RIFS) * RCBRA provides "basis for action" to...

168

DEVELOPING CORRIDOR-LEVEL TRUCK TRAVEL TIME ESTIMATES AND OTHER  

E-Print Network [OSTI]

by comparing estimated travel times during a winter weather-induced delay. The analysis showed that corridor given on increased sensor spacing and filter improvement. Finally, potential performance metrics

Bertini, Robert L.

169

I-65 Clean Corridor: Fall Drive Overview and Media Summary  

Broader source: Energy.gov [DOE]

At the May 1, 2008 joint quarterly Web conference of DOE's Biomass and Clean Cities programs, Julie Howe (Indiana Office of Energy & Defense Development) described the I-65 Corridor Project.

170

PP-369 British Columbia Transmission Corporation and British Columbia Hydro  

Broader source: Energy.gov (indexed) [DOE]

PP-369 British Columbia Transmission Corporation and British PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Presidential Permit authorizing British Columbia Transmission Corporation and British Columbia Hydro and Power Authority to construct, operate,a dn maintain electric transmission facilities at the U.S. - Canada Border. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority More Documents & Publications PP-369 British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application to Amend Presidential Permit OE Docket No. PP-022-4 British

171

Docket-EO-05-01: Documents Concerning the 2005-2007 Emergency Reliability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Docket-EO-05-01: Documents Concerning the Docket-EO-05-01: Documents Concerning the 2005-2007 Emergency Reliability Orders Concerning the Potomac River Generating Station under Section 202(c) of the Federal Power Act Docket-EO-05-01: Documents Concerning the 2005-2007 Emergency Reliability Orders Concerning the Potomac River Generating Station under Section 202(c) of the Federal Power Act The Department of Energy hereby makes the following documents in DOE docket number EO-05-01 available to the public. This proceeding is separate from a proceeding before the Federal Energy Regulatory Commission (FERC) at FERC docket number EL05-145-000. Submissions to DOE's docket are not considered to be filed in the FERC docket, and actions taken in the docket before DOE have no bearing on actions taken by FERC in the docket before it. However,

172

The Canary Eddy Corridor: A major pathway for long-lived eddies in the subtropical North Atlantic  

E-Print Network [OSTI]

corridor, whose source is the flow perturbation of the Canary Current and the Trade Winds at the Canary westward- propagating eddy corridors were also detected: two small corridors north and south of the Azores Front; a small zonal corridor located near 31 % oN, south of the island of Madeira; and a small corridor

Dong, Changming "Charles"

173

2009 National Electric Transmission Congestion Study | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9 National Electric Transmission Congestion Study 9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor). The 2009 study is the second Congestion Study that the Department conducted. The first Congestion Study was conducted in 2006. Preparations

174

FE DOCKET NO. 11-59-LNG | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

FE DOCKET NO. 11-59-LNG FE DOCKET NO. 11-59-LNG FE DOCKET NO. 11-59-LNG ORDER NO. 3324 CONDITIONALLY GRANTING LONG-TERM MULTI-CONTRACT AUTHORIZATION TO EXPORT LIQUEFIED NATURAL GAS BY VESSEL FROM THE LAKE CHARLES TERMINAL TO NON-FREE TRADE AGREEMENT NATIONS Based on a review of the complete record and for the reasons set forth below, DOE/FE has concluded that the opponents of the Lake Charles Exports, LLC (LCE) Application have not demonstrated that the requested authorization will be inconsistent with the public interest. As described below, we find that the exports proposed in this Application are likely to yield net economic benefits to the United States. Accordingly, for this and other reasons set forth below, we are conditionally granting the LCE Application, subject to satisfactory completion of environmental review and

175

CERTIFICATION DOCKET FOR AL-TECH SPECIALTY STEEL CORPORATION  

Office of Legacy Management (LM)

NY. NY. 0 -02-3 CERTIFICATION DOCKET FOR AL-TECH SPECIALTY STEEL CORPORATION (THE F01umz ALLEGHENY-LUDLUM STEEL CORPORATION) WATERVLIET, NEW YORK, AND OFFSITE PROPERTY IN DUNKIRK, NEW YORK Department of Energy Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects CONTENTS Introduction to the Certification Docket for the Al-Tech Specialty Steel Corporation, (the Former Allegheny-Ludlum Steel Corporation) Watervliet, New York, and Offsite Property in Dunkirk, New York Exhibit I: Exhibit II: Purpose Docket Contents Summary of Activities at the Al-Tech Specialty Steel Corporation, (the Former Allegheny-Ludlum Steel Corporation) Watervliet, New York, and Offsite Property in Dunkirk, New York

176

Letter Response from the Plumbing Manufacturers Institute (PMI), Docket No.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Response from the Plumbing Manufacturers Institute (PMI), Response from the Plumbing Manufacturers Institute (PMI), Docket No. EERE-2010-BT-NOA-0016 - Notice of Availability of Interpretive Rule on the Applicability of Current Water Conservation Standards for Showerheads Letter Response from the Plumbing Manufacturers Institute (PMI), Docket No. EERE-2010-BT-NOA-0016 - Notice of Availability of Interpretive Rule on the Applicability of Current Water Conservation Standards for Showerheads Letter Response from the Plumbing Manufacturers Institute (PMI), Docket No. EERE-2010-BT-NOA-0016 - Notice of Availability of Interpretive Rule on the Applicability of Current Water Conservation Standards for Showerheads. This is the cover letter to additional comments submitted by PMI after alerting the DOE to its belief that the Interpretive Rule should be subject

177

FE DOCKET NO. 10-161-LNG | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

FE DOCKET NO. 10-161-LNG FE DOCKET NO. 10-161-LNG FE DOCKET NO. 10-161-LNG ORDER CONDITIONALLY GRANTING LONG-TERM MULTI-CONTRACT AUTHORIZATION TO EXPORT LIQUEFIED NATURAL GAS BY VESSEL FROM THE FREEPORT LNG TERMINAL ON QUINTANA ISLAND, TEXAS TO NON-FREE TRADE AGREEMENT NATIONS Based on a review of the complete record and for the reasons set forth below, DOE/FE has concluded that the opponents of the FLEX Application have not demonstrated that the requested authorization would be inconsistent with the public interest. As further described below, we find that the exports proposed in this Application are likely to yield net economic benefits to the United States. We further find that granting the requested authorization is unlikely to affect adversely the availability of natural gas supplies to domestic consumers or result in natural gas price increases

178

Property:FERC License Docket Number | Open Energy Information  

Open Energy Info (EERE)

License Docket Number License Docket Number Jump to: navigation, search This is a property of type string. Pages using the property "FERC License Docket Number" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/Admirality Inlet Tidal Energy Project + P-12690 + MHK Projects/Algiers Light Project + P-12848 + MHK Projects/Anconia Point Project + P-12928 + MHK Projects/Astoria Tidal Energy + P-12665 + MHK Projects/Avalon Tidal + P-14228 + MHK Projects/Avondale Bend Project + P-12866 + MHK Projects/BW2 Tidal + P-14222 + MHK Projects/Bar Field Bend + P-12942 + MHK Projects/Barfield Point + P-13489 + MHK Projects/Bayou Latenache + P-13542 + MHK Projects/Belair Project + P-13125 + MHK Projects/Bondurant Chute + P-13477 + MHK Projects/Breeze Point + P-13480 +

179

Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project -Compliance  

E-Print Network [OSTI]

DOCKETED Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project - Compliance TN schedule and procedures necessary to conclude the amendment review process. At the Prehearing Conference

180

Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project -Compliance  

E-Print Network [OSTI]

DOCKETED Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project - Compliance TN-700-2009-004.PDF #12;2 Notice of Committee's Intention to Use Informal Hearing Procedures Pursuant

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Application to Export Electric Energy OE Docket No. EA-145-D...  

Broader source: Energy.gov (indexed) [DOE]

Export Electric Energy OE Docket No. EA-145-D Powerex Corporation: Federal Register Notice Volume 73, No. 227 - Nov. 28, 2008 Application to Export Electric Energy OE Docket No....

182

Application to export electric energy OE docket No. EA-262-C...  

Broader source: Energy.gov (indexed) [DOE]

docket No. EA-262-C TransCanada Power Marketing Ltd Application to export electric energy OE docket No. EA-262-C TransCanada Power Marketing Ltd Application from TransCanada Power...

183

Application to Export Electric Energy OE Docket No. EA-348 FPL...  

Broader source: Energy.gov (indexed) [DOE]

Export Electric Energy OE Docket No. EA-348 FPL Energy Power Marketing, Inc. Application to Export Electric Energy OE Docket No. EA-348 FPL Energy Power Marketing, Inc. Application...

184

Application to export electric energy OE Docket No. EA-264-B...  

Broader source: Energy.gov (indexed) [DOE]

Docket No. EA-264-B ENMAX Energy Marketing Inc Application to export electric energy OE Docket No. EA-264-B ENMAX Energy Marketing Inc Application from ENMAX Energy Marketing Inc...

185

Application to Export Electric Energy OE Docket No. EA-216-C...  

Broader source: Energy.gov (indexed) [DOE]

Export Electric Energy OE Docket No. EA-216-C TransAlta Energy Marketing (U.S) Inc Sierra Club Withdrawal Motion Application to Export Electric Energy OE Docket No. EA-216-C...

186

Mechanisms Governing the Persistence and Diurnal Cycle of a Heavy Rainfall Corridor  

Science Journals Connector (OSTI)

Observations and convection-permitting simulations are used to study a 12-day warm-season heavy precipitation corridor over the central U.S. plains and Mississippi River valley regions. Such precipitation corridors, defined by narrow latitudinal ...

Stanley B. Trier; Christopher A. Davis; Richard E. Carbone

2014-11-01T23:59:59.000Z

187

Milford Wind Corridor Phase II | Open Energy Information  

Open Energy Info (EERE)

Milford Wind Corridor Phase II Milford Wind Corridor Phase II Facility Milford Wind Corridor Phase II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner First Wind Developer First Wind Energy Purchaser Southern California Public Power Authority Location Millard and Beaver County UT Coordinates 38.645608°, -112.878027° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.645608,"lon":-112.878027,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

188

Application to Export Electric Energy OE Docket No. EA-357 Hunt Electric  

Broader source: Energy.gov (indexed) [DOE]

7 Hunt 7 Hunt Electric Power Marketing, L.L.C.: Federal Register Notice Volume 74, No. 117 - Jun. 19, 2009 Application to Export Electric Energy OE Docket No. EA-357 Hunt Electric Power Marketing, L.L.C.: Federal Register Notice Volume 74, No. 117 - Jun. 19, 2009 Application from Hunt Electric Power Marketing, L.L.C. to export electric energy to Mexico. Federal Register Notice Vol 74 No 117 EA-357 Hunt Electric Power Marketing, L.L.C. More Documents & Publications EIS-0391: DOE Notice of Availability of a Final Environmental Impact Statement PP-89-1 Bangor Hydro-Electric Company Proposed Open Access Requirement for International Electric Transmission Facilities and Delegation to the Federal Energy Regulatory Commission: Federal Register Notice Volume 64, No. 143 - Jul. 27, 1999

189

Application for presidential permit OE Docket No. PP-230-4 International  

Broader source: Energy.gov (indexed) [DOE]

Out of Time and Out of Time and Comments of PEPCO Holdings, INC. Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Petition to Intervene Out of Time and Comments of PEPCO Holdings, INC. Pepco Holdings, Inc. ("PHI"), on its own behalf and on behalf of its affiliates Potomac Electric Power Company ("Pepco"), Atlantic City Electric Company ("Atlantic City"), and Delmarva Power & Light Company ("Delmarva") (collectively, the "PHI Companies"), respectfully submits this petition to intervene out of time and comments in support of the March 25, 2011 filing by PJM Interconnection, L.L.C. ("PJM") in the above-captioned proceeding. PETITION TO INTERVENE OUT OF TIME AND COMMENTS OF PEPCO HOLDINGS, INC.

190

Autonomous Corridor Flight of a UAV Using an RGB-D Camera  

E-Print Network [OSTI]

Autonomous Corridor Flight of a UAV Using an RGB-D Camera System Overview We describe the first application of the novel Kinect RGB-D sensor on a fully autonomous quadrotor UAV. We apply the UAV in an indoor corridor scenario. The position and orientation of the UAV inside the corridor is extracted from

Cremers, Daniel

191

Natural Gas Transmission Pipeline Siting Act (Florida) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Natural Gas Transmission Pipeline Siting Act (Florida) Natural Gas Transmission Pipeline Siting Act (Florida) Natural Gas Transmission Pipeline Siting Act (Florida) < Back Eligibility Commercial Construction Developer Fed. Government Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection This Act establishes a centralized and coordinated permitting process for the location of natural gas transmission pipeline corridors and the construction and maintenance of natural gas transmission pipelines. The Act intends to achieve a reasonable balance between the need for the natural

192

Mixing Fast Trains on Freight Rail Corridors presented by  

E-Print Network [OSTI]

Mixing Fast Trains on Freight Rail Corridors presented by: Minnesota Department of Transportation May 23, 2012 #12;Presentation Outline · State Plans for Fast (Passenger) Trains · Overarching) Suggest picture of CP grain train be inserted here #12;Passenger Rail Development Overarching Principles

Minnesota, University of

193

Central Corridor Light Rail Transit Briefing for Campus Connections  

E-Print Network [OSTI]

impacts in comments to Draft Environmental Impact Statement · Fall/Winter 2007-2008: Met Council enters Impact (EMI) Goals · Preserve the existing environmental quality of the labs ­ DO NO HARM · Const Corridor should realize development opportunities while reducing impact to the urban environment

Thomas, David D.

194

Docket No's EERE-2010-BT-TP-0044 and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

No's EERE-2010-BT-TP-0044 and No's EERE-2010-BT-TP-0044 and EERE-2010-BT-STD-0043 Energy Conservation Program: Energy Conservation Standards and Test Procedures for HID Lamps Docket No's EERE-2010-BT-TP-0044 and EERE-2010-BT-STD-0043 Energy Conservation Program: Energy Conservation Standards and Test Procedures for HID Lamps This memorandum memorializes a communication involving NEMA Lamp Section members and DOE staff in connection with this proceeding. Ex Parte Letter NEMA re DOE HID Lamps Rules.pdf More Documents & Publications EERE-2010-BT-STD-0027 Ex Parte Letter NEMA Motor Training re DOE Motors Rule 15 July 2013. Docket No. EERE-2010-BT-STD-0027 Energy Conservation Standards for Commercial and Industrial Electric Motors: Public Meeting and Availability of the Preliminary Technical Support Document 77 Fed. Reg. 43015 (July 23,

195

CERTIFICATION DOCKET FOR AL-TECHSPECIALTY STEEL CORPORATION  

Office of Legacy Management (LM)

AL-TECHSPECIALTY STEEL CORPORATION AL-TECHSPECIALTY STEEL CORPORATION (THEFoRMERALLEGHENY-LUDLUMSTEELCORPORATION) WATERVLIET,NEWYORK,ANDOFFSITEPROPER?YIN DUNKIRK,NEWYORK Department of Energy Office of Nuciear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects CONTENTS Page Introduction to the Certification Docket for the Al-Tech Specialty Steel Corporation, (the Former Allegheny-Ludlum Steel Corporation) Watervliet, New York, and Offsite Property in Dunkirk, New York Purpose Docket Contents Exhibit I: Summary of Activities at the Al-Teen Specialty Steel Corporation, (the Former Allegheny-Ludlum Steel Corporation) Watervliet, New York, and Offsite Property in Dunkirk, New York Exhibit II: Documents Supporting the Certification of the Al-Tech Specialty Steel Corporation,

196

2006 National Electric Transmission Congestion Study and Related Materials  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study and Related 6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints and identifies areas that are transmission-constrained. This is the first Congestion Study the Department conducted. Based on this study, two National Interest Electric Transmission Corridors were designated in 2007. They were invalidated by a federal appeals court in 2011. Comments and form letters were submitted by the public in response to this study. National Electric Transmission Congestion Study 2006 Executive Summary Full Text of the National Electric Transmission Congestion Study 2006

197

Lake Worth Corridor, Florida: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Worth Corridor, Florida: Energy Resources Worth Corridor, Florida: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 26.6184015°, -80.1011539° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.6184015,"lon":-80.1011539,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

198

West Vero Corridor, Florida: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Corridor, Florida: Energy Resources Corridor, Florida: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 27.6394769°, -80.4817201° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":27.6394769,"lon":-80.4817201,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

199

Application to export electric energy OE Docket No. EA-348 FPL Energy Power  

Broader source: Energy.gov (indexed) [DOE]

export electric energy OE Docket No. EA-348 FPL export electric energy OE Docket No. EA-348 FPL Energy Power Marketing Inc: Federal Register Notice Volume 74, No. 15 - Jan. 26, 2009 Application to export electric energy OE Docket No. EA-348 FPL Energy Power Marketing Inc: Federal Register Notice Volume 74, No. 15 - Jan. 26, 2009 Application from FPL Energy Power Marketing Inc to export electric energy to Canada. Federal Register Notice Vol 74 No 15 Application to export electric energy OE Docket No. EA-348 FPL Energy Power Marketing Inc More Documents & Publications Application to Export Electric Energy OE Docket No. EA-348 FPL Energy Power Marketing, Inc. EA-348 FPL Energy Power Marketing, Inc. Application to export electric energy OE Docket No. EA-216-C TransAlta Energy Marketing (U.S) Inc: Federal Register Notice Volume 76, No. 14 -

200

Application to export electric energy OE Docket No. EA-315-A BP Energy:  

Broader source: Energy.gov (indexed) [DOE]

export electric energy OE Docket No. EA-315-A BP export electric energy OE Docket No. EA-315-A BP Energy: Federal Register Notice Volume 76, No. 217 - Nov. 9, 2011 Application to export electric energy OE Docket No. EA-315-A BP Energy: Federal Register Notice Volume 76, No. 217 - Nov. 9, 2011 Application from BP Energy to export electric energy to Canada. Federal Register Notice. EA-315-A BP Energy_CN.pdf More Documents & Publications Application to export electric energy OE Docket No. EA-314-A BP Energy: Federal Register Notice Volume 76, No. 217 - Nov. 9, 2011 Application to Export Electric Energy OE Docket No. EA-385 Dynasty Power, Inc: Federal Register Notice, Volume 77, No. 129 - July 5, 2012 Application to Export Electric Energy OE Docket No. EA-211-C DTE Energy Trading Inc: Federal Register Notice, Volume 77, No. 50 -March 14, 2012

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Application to Export Electric Energy OE Docket No. EA-258-D Brookfield  

Broader source: Energy.gov (indexed) [DOE]

Export Electric Energy OE Docket No. EA-258-D Export Electric Energy OE Docket No. EA-258-D Brookfield Energy Marketing Inc.: Federal Register Notice, Volume 78. No. 213 - Nov. 4, 2013 Application to Export Electric Energy OE Docket No. EA-258-D Brookfield Energy Marketing Inc.: Federal Register Notice, Volume 78. No. 213 - Nov. 4, 2013 Application from Brookfield Energy to export electric energy to Canada. Federal Register Notice. EA-258-D Brookfield Energy (CN).pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-145-E Powerex Corporation: Federal Register Notice, Volume 78, No. 213 - Nov. 4, 2013 Application to Export Electric Energy OE Docket No. EA-258-D Brookefield Energy Marketing Inc. Application to Export Electric Energy OE Docket No. EA-338-A Shell Energy

202

Application to Export Electric Energy OE Docket No. EA-388 TEC Energy Inc.:  

Broader source: Energy.gov (indexed) [DOE]

Application to Export Electric Energy OE Docket No. EA-388 TEC Application to Export Electric Energy OE Docket No. EA-388 TEC Energy Inc.: Federal Register Notice, Volume 78, No. 208 - Oct. 18, 2013 Application to Export Electric Energy OE Docket No. EA-388 TEC Energy Inc.: Federal Register Notice, Volume 78, No. 208 - Oct. 18, 2013 Application from TEC Energy to export electric energy to Canada. Federal Register Notice. EA-388 TEC CN.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-388 TEC Energy Inc. Application to Export Electric Energy OE Docket No. EA-345-A New Brunswick Energy Marketing Corp: Federal Register Notice, Volume 78, No. 208 - Oct. 28, 2013 Application to Export Electric Energy OE Docket No. EA-258-D Brookfield Energy Marketing Inc.: Federal Register Notice, Volume 78. No. 213 - Nov.

203

2010 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report  

SciTech Connect (OSTI)

This report documents eh status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with CERLA cleanup of National Priorities List waste sites at Hanford. This report contains vegetation monitoring data that were collected in the spring and summer of 2010 from the River Corridor Closure Contract’s revegetation and mitigation areas on the Hanford Site.

C. T. Lindsey, A. L. Johnson

2010-09-30T23:59:59.000Z

204

2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report  

SciTech Connect (OSTI)

This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractor’s revegetation and mitigation areas on the Hanford Site.

West, W. J.; Lucas, J. G.; Gano, K. A.

2011-11-14T23:59:59.000Z

205

Milford Wind Corridor Phase I (GE Energy) | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Milford Wind Corridor Phase I (GE Energy) Jump to: navigation, search Name Milford Wind Corridor Phase I (GE Energy) Facility Milford Wind Corridor Phase I (GE Energy) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner First Wind Developer First Wind Energy Purchaser Southern California Public Power Authority Location Milford UT Coordinates 38.52227°, -112.935262° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.52227,"lon":-112.935262,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

206

Dulles Corridor Metrorail Project Extension to Wiehle Avenue  

E-Print Network [OSTI]

Airports Authority (MWAA) on February 4, 2010 to conduct a monthly progress meeting for work performed in January 2010 and attended various project meetings on the afternoon of February 4, 2010. As of February 15, Hill is providing a full-time, on-site PMOC presence at the Dulles Corridor project office. The anticipated schedule of PMOC monthly progress meetings is that they will occur during the last week of each month. 1. Project Description MWAA, in cooperation with the Washington Metropolitan Area Transit Authority (WMATA), proposes to implement a 23.1-mile rapid transit system in the Dulles Corridor of Northern Virginia. The proposed corridor follows the alignment of the Dulles International Airport Access Highway (DIAAH) and the Dulles Toll Road within Fairfax County, and the Dulles Greenway, a private toll road in Loudoun County. The Project (Initial Operating Segment) undertakes the construction of the initial 11.7-miles of the rail project from the existing Metrorail Orange Line just east of the West Falls Church (WFC) Station to a station to be constructed at Wiehle Avenue with a total project cost of $3.142 billion. Included in the Project are five new stations (Tysons East, Tysons Central 123, Tysons Central 7, Tysons West and Wiehle Avenue),

unknown authors

2010-01-01T23:59:59.000Z

207

(DOE/EIS-0285/SA-120): Supplement Analysis for the Transmission System Vegetation Management Program FEISq 2/10/03  

Broader source: Energy.gov (indexed) [DOE]

0, 2003 0, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-120 Hanford-Ostrander Corridor Maintenance William Erickson TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management for the Hanford-Ostrander Transmission Line Corridor from Tower 10/4 to Tower 17/2 + 770. The line is a 500kV Single Circuit Transmission Line having an easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as referenced on the attached checklist. Location: The subject right-of-way is located in Benton County, WA. In the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

208

Application to Export Electric Energy OE Docket No. EA-353 Boralex...  

Broader source: Energy.gov (indexed) [DOE]

Documents & Publications Application to export electric energy OE Docket No. EA-164-C Constellation Energy Commodities Group, Inc: Federal Register Notice Volume 74, No. 151 -...

209

Application to Export Electric Energy OE Docket No. EA-360 Iberdrola...  

Broader source: Energy.gov (indexed) [DOE]

Iberdrola Rnewables, Inc Application to export electric energy OE Docket No. EA-164-C Constellation Energy Commodities Group, Inc: Federal Register Notice Volume 74, No. 151 -...

210

Application to export electric energy OE Docket No. EA-164-C...  

Broader source: Energy.gov (indexed) [DOE]

164-C Constellation Energy Commodities Group, Inc: Federal Register Notice Volume 74, No. 151 - Aug. 7, 2009 Application to export electric energy OE Docket No. EA-164-C...

211

Application to Export Electric Energy OE Docket No. EA-209-B...  

Broader source: Energy.gov (indexed) [DOE]

B Cargill Power Markets Application to Export Electric Energy OE Docket No. EA-209-B Cargill Power Markets Application from Cargill Power Markets to export electric energy to...

212

Application to Export Electric Energy OE Docket No. EA-385 Dynasty...  

Broader source: Energy.gov (indexed) [DOE]

More Documents & Publications Application to Export Electric Energy OE Docket No. EA-386 IPR-GDF SUEZ Energy Marketing (GSEMNA): Federal Register Notice, Volume 77, No. 129 - July...

213

Application to Export Electric Energy OE Docket No. EA-296-B...  

Office of Environmental Management (EM)

Application to Export Electric Energy OE Docket No. EA-296-B Rainbow Energy Marketing Corp: Federal Register Notice, Volume 77, No. 66 - April 4, 2012 Application to Export...

214

Application to Export Electric Energy OE Docket No. EA-97-D Portland...  

Broader source: Energy.gov (indexed) [DOE]

97-D Portland General Electric Company Application to Export Electric Energy OE Docket No. EA-97-D Portland General Electric Company Application from PGE to export electric energy...

215

Application to Export Electric Energy OE Docket No. EA-345-A...  

Broader source: Energy.gov (indexed) [DOE]

Application to Export Electric Energy OE Docket No. EA-345-A New Brunswick Energy Marketing Corp: Comment from Jean Public Application from New Brunswick Energy Marketing Corp...

216

Application to Export Electric Energy OE Docket No. EA-345-A...  

Broader source: Energy.gov (indexed) [DOE]

Application to Export Electric Energy OE Docket No. EA-345-A New Brunswick Energy Marketing Corp: Federal Register Notice, Volume 78, No. 208 - Oct. 28, 2013 Application from...

217

Application to Export Electric Energy OE Docket No. EA-401 Lonestar...  

Broader source: Energy.gov (indexed) [DOE]

Application Application to Export Electric Energy OE Docket No. EA-401 Lonestar Power Marketing LLC: Request to Suspend Consideration of Application Application from Lonestar to...

218

Application to Export Electric Energy OE Docket No. EA-264-C...  

Broader source: Energy.gov (indexed) [DOE]

Enmax Energy Marketing, Inc. Application to Export Electric Energy OE Docket No. EA-264-C Enmax Energy Marketing, Inc. Application from ENMAX to export electric energy to Canada....

219

Application to Export Electric Energy OE Docket No. EA-296-B...  

Broader source: Energy.gov (indexed) [DOE]

B Rainbow Energy Marketing Corp Application to Export Electric Energy OE Docket No. EA-296-B Rainbow Energy Marketing Corp Application from Rainbow Energy Marketing Corp to export...

220

Application to Export Electric Energy OE Docket No. EA-296-A...  

Broader source: Energy.gov (indexed) [DOE]

Application to Export Electric Energy OE Docket No. EA-296-A Rainbow Energy Marketing Corporation Application from Rainbow Energy Marketing Corporation to export electric...

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Application to Export Electric Energy OE Docket No. EA-401 Lonestar...  

Broader source: Energy.gov (indexed) [DOE]

17, 2014 Application to Export Electric Energy OE Docket No. EA-401 Lonestar Power Marketing LLC: Federal Register Notice, Volume 79, No. 116 - June 17, 2014 Application from...

222

Application to Export Electric Energy OE Docket No. EA-296-A...  

Broader source: Energy.gov (indexed) [DOE]

16, 2007 Application to Export Electric Energy OE Docket No. EA-296-A Rainbow Energy Marketing Corporation: Federal Register Notice Volume 72, No. 158 - Aug. 16, 2007 Application...

223

Application to Export Electric Energy OE Docket No. EA-258-C...  

Broader source: Energy.gov (indexed) [DOE]

C Brookfield Energy Marketing INC. Application to Export Electric Energy OE Docket No. EA-258-C Brookfield Energy Marketing INC. Application from Brookfield Energy Marketing INC....

224

Application to Export Electric Energy OE Docket No. EA-258-D...  

Broader source: Energy.gov (indexed) [DOE]

Brookefield Energy Marketing Inc. Application to Export Electric Energy OE Docket No. EA-258-D Brookefield Energy Marketing Inc. Application from Brookefield Energy to export...

225

Application to Export Electric Energy OE Docket No. EA-345-A...  

Broader source: Energy.gov (indexed) [DOE]

Application to Export Electric Energy OE Docket No. EA-345-A New Brunswick Energy Marketing Corp. Application from New Brunswick Energy Marketing Corp. to export electric...

226

Application to Export Electric Energy OE Docket No. EA-329 Sierra...  

Broader source: Energy.gov (indexed) [DOE]

9 Sierra Power Asset Marketing, LLC Application to Export Electric Energy OE Docket No. EA-329 Sierra Power Asset Marketing, LLC Application from Sierra Power Asset Marketing, LLC...

227

Application to Export Electric Energy OE Docket No. EA-145-E...  

Broader source: Energy.gov (indexed) [DOE]

Corporation: Federal Register Notice, Volume 78, No. 213 - Nov. 4, 2013 Application to Export Electric Energy OE Docket No. EA-145-E Powerex Corporation: Federal Register Notice,...

228

National Electric Transmission Congestion Study 2009 Executive Summary  

Broader source: Energy.gov (indexed) [DOE]

Executive Executive Summary In the Energy Policy Act of 2005 (EPAct), Con- gress directed the U.S. Department of Energy (DOE) to conduct a study every three years on elec- tric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to in- clude in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmis- sion capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest elec- tric transmission corridor (National Corridor). In August 2006, the Department published its first National Electric

229

Voluntary Protection Program Onsite Review, River Corridor Closure Project- June 2012  

Broader source: Energy.gov [DOE]

Evaluation to determine whether River Corridor Closure Project is continuing to perform at a level deserving DOE-VPP Star recognition.

230
231

Comments of the Northeast Power Coordinating Council FE Docket No. 99-1 |  

Broader source: Energy.gov (indexed) [DOE]

the Northeast Power Coordinating Council FE Docket No. the Northeast Power Coordinating Council FE Docket No. 99-1 Comments of the Northeast Power Coordinating Council FE Docket No. 99-1 On July 21, 1999 the Department of Energy, hereinafter "DOE" or the "Department" issued its Notice of Proposed Amendment to the Predidential Permits and Export Authorizations and Delegation and Assignment to the Federal Energy Regulatory Commission. Comments of the Northeast Power Coordinating Council FE Docket No. 99-1 More Documents & Publications Joint comments of consumers energy company and the detriot edison company on notice of proposed amendment. FE Docket No. 99-1 Motion to Intervene and Comments of Public Utility District No. 1 (Pend Oreille County, Washington) on PP 99-1 Notice of Intent to Amend

232

Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy  

Broader source: Energy.gov (indexed) [DOE]

Application to Export Electric Energy OE Docket No. EA-318-B AEP Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners, Inc: Emergency Filing from AEP Requesting Temporary Export Authorization Extension Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners, Inc: Emergency Filing from AEP Requesting Temporary Export Authorization Extension Application from AEP Energy requesting temporary export authorization extension to export electric energy to Mexico. Emergency Filing from AEP requesting temp ext.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: AEP Response to Sierra's Club Response for Temporary Emergency Authorization Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy

233

Application to export electric energy OE Docket No. EA-164-C Constellation  

Broader source: Energy.gov (indexed) [DOE]

export electric energy OE Docket No. EA-164-C export electric energy OE Docket No. EA-164-C Constellation Energy Commodities Group, Inc: Federal Register Notice Volume 74, No. 151 - Aug. 7, 2009 Application to export electric energy OE Docket No. EA-164-C Constellation Energy Commodities Group, Inc: Federal Register Notice Volume 74, No. 151 - Aug. 7, 2009 Application from Constellation Energy Commodities Group, Inc to export electric energy to Canada. Federal Register Notice Vol 74 No 151 EA-164-C Constellation Energy Commodities Group, Inc More Documents & Publications EA-164-C Constellation Energy Commodities Group, Inc Application to Export Electric Energy OE Docket No. EA-164-C Constellation Energy Commodities Group, Inc Application to Export Electric Energy OE Docket No. EA-353 Boralex Fort

234

Ex Parte Communication - Docket EERE-2012-BT-STD-0022 | Department of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

- Docket EERE-2012-BT-STD-0022 - Docket EERE-2012-BT-STD-0022 Ex Parte Communication - Docket EERE-2012-BT-STD-0022 On September 5, 2012, representatives from PJM Interconnection LLC, National Rural Electric Cooperatives Association, Edison Electric Institute, American Public Power Association, and the Steffes Corporation (together, "Joint Commenters") met with members of the Department of Energy ("Department") to discuss the request for information "[...] Energy Conservation Standards for Residential Water Heaters" and the comments filed therein. DOE_EnergyEfficiencyStandardsForLargeVolumeWaterHeaters.pdf More Documents & Publications Ex Parte Communication, Docket EERE-2012-BT-STD-0022 Ex Parte Communication, Docket EERE-2012-BT-STD-0022 PJM Presentation - The Silver Bullet: Storage! (July 12, 2011)

235

Idaho/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Local Regulations Idaho/Transmission/Local Regulations < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Local Siting Process The typical siting process for a transmission line in Idaho will fall to the local units of government in the form of local siting permits, because NIETCs are lacking within Idaho. Chapter 65, Title 67 of Idaho Code extends authority to the counties to include transmission corridors in their comprehensive plans and provides ordinance authority and processes for granting such permits. When the siting process falls to the county level,

236

Planning Near-Optimal Corridors Amidst , Jur van den Berg2  

E-Print Network [OSTI]

Planning Near-Optimal Corridors Amidst Obstacles Ron Wein1 , Jur van den Berg2 , and Dan Halperin1 and Computing Sciences, Utrecht University berg@cs.uu.nl Abstract. Planning corridors among obstacles has arisen. Wein, J. van den Berg, and D. Halperin We would therefore like to indicate the global direction

van den Berg, Jur

237

(DOE/EIS-0285/SA-59): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/19/02  

Broader source: Energy.gov (indexed) [DOE]

April 19, 2002 April 19, 2002 REPLY TO ATTN OF: KEP SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-59) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis Covington/ Raver Paul / Paul Alston 230 and 500 kV Transmission line Corridor ROW 48/2 to 70/6 and 1/1 to 13/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with a corridor width of 250 to 442 feet. Location: The ROW is located in Thurston County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

238

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

239

GRR/Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor |  

Open Energy Info (EERE)

GRR/Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor GRR/Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor 03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Transportation Harbors Divsion Regulations & Policies Hawaii Revised Statutes Chapter 277 Triggers None specified Click "Edit With Form" above to add content 03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

240

Docket EE-RM/STD-02-112  

Broader source: Energy.gov (indexed) [DOE]

Energy Conservation Standards for New Federal Commercial and Multi-Family High-Rise Residential Energy Conservation Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings and New Federal Low-Rise Residential Buildings DOCKET NUMBER: EE-RM/STD-02-112 CLOSING DATE: 02/02/2007 COMMENT NUMBER DATE RECEIVED /DATE OF LETTER NAME & TITLE OF COMMENTATOR AFFILIATION & ADDRESS OF COMMENTATOR 1 01/31/07 01/31/07 Thomas D. Culp, Ph.D Consultant Birch Point Consulting LLC W6025 Rim of the City Road La Cross, WI 54601 2 02/01/07 02/01/07 Renee LaMura Director of Member Services Polyisocyanurate Insulation Manufacturers Association (PIMA) 7315 Wisconsin Ave., Suite 400E Bethesda, MD, 20814 3 02/01/07 02/01/07 Rick L. Landers Business Manager Office of the Chief Engineer Capital Improvements Business Links Naval Facilities Engineering Command

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Remedial Action Certification Docket - Sodium Reactor Experiment (SRE)  

Office of Legacy Management (LM)

c~-?i-- c~-?i-- I ,3-l Remedial Action Certification Docket - Sodium Reactor Experiment (SRE) .Complex and the Hot Cave Facility (Bldg. 003), Santa Susana ,Fie!d Laboratory, Chatsworth, California ..:'..~::Yerlette Gatl in, MA-232 I am attaching for entry into the Public Document Room, one copy of the N -23 subject documentat ion. These documents are the backup data for the certification that the facilfties are radiologically acceptable for b- unrestricted use as noted in the certification statement published in the &aney Federal Register. Inasmuch as the certification for unrestricted use is 9/2(/85 being published in the Federal Register, it is prudent that the attached documentation also be available to the public. These documents should be retained In accordance with DOE Order 1324.2--disposal schedule 25.

242

BPA, Transmission, non-wires measures for the I-5 Corridor Reinforceme...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

measures using insulation and more efficient appliances and cooling systems Demand response at the local level, such as thermostat controls, to better regulate energy use...

243

ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project  

SciTech Connect (OSTI)

Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor to continue with the project, the Watts Bar Dam Project was canceled and the Exploranium radiation monitors were removed from the doors of Watts Bar Dam in early 2006. The DHS Domestic Nuclear Detection Office decided to proceed with a Pilot building on the ORNL work performed at the TN and SC weigh stations in the highway sector of the Trusted Corridors project and eventually expanded it to other southern states under the name of Southeastern Corridor Pilot Project (SETCP). Many of the Phase I goals were achieved however real-world test data of private watercraft and barges was never obtained.

Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

2011-11-01T23:59:59.000Z

244

(8/10/2011) Docket Optical System -Fwd: DyoCore Response to Complaint of Energy Commission -Incomplete Page 1 From: Jennifer Martin-Gallardo  

E-Print Network [OSTI]

(8/10/2011) Docket Optical System - Fwd: DyoCore Response to Complaint of Energy Commission - Incomplete Page 1 From: Jennifer Martin-Gallardo To: Docket Optical System Date: 8/9/2011 4:25 PM Subject: Fwd: DyoCore Response to Complaint of Energy Commission - Incomplete Dockets, Please docket

245

1996 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect (OSTI)

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

246

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35)  

Broader source: Energy.gov (indexed) [DOE]

14, 2001 14, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line ROW and the Mossy Rock-Chehalis Transmission Line ROW, between 7/1 to 27/10. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 162 feet. Location: The ROW is located in Lewis County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

247

Strategy for the Identification of an INL Comprehensive Utility Corridor  

SciTech Connect (OSTI)

This report documents the strategy developed to identify a comprehensive utility corridor (CUC) on the Idaho National Laboratory (INL) Site. The strategy established the process for which the Campus Development Office will evaluate land management issues. It is a process that uses geographical information system geospatial technology to layer critical INL mission information in a way that thorough evaluations can be conducted and strategies developed. The objective of the CUC Project was to develop a process that could be implemented to identify potential utility corridor options for consideration. The process had to take into account all the missions occurring on the INL and other land-related issues. The process for developing a CUC strategy consists of the following four basic elements using geographical information system capabilities: 1. Development of an INL base layer map; this base layer map geospatially references all stationary geographical features on INL and sitewide information. 2. Development of current and future mission land-use need maps; this involved working with each directorate to identify current mission land use needs and future land use needs that project 30 years into the future. 3. Development of restricted and potential constraint maps; this included geospatially mapping areas such as wells, contaminated areas, firing ranges, cultural areas, ecological areas, hunting areas, easement, and grazing areas. 4. Development of state highway and power line rights of way map; this included geospatially mapping rights-of-way along existing state highways and power lines running through the INL that support INL operations. It was determined after completing and evaluating the geospatial information that the area with the least impact to INL missions was around the perimeter of the INL Site. Option 1, in this document, identifies this perimeter; however, it does not mean the entire perimeter is viable. Many places along the perimeter corridor cannot be used or are not economically viable. Specific detailed studies will need to be conducted on a case-by-case basis to clearly identify which sections along the perimeter can and cannot be used. Option 2, in this document, identifies areas along existing highways that could be a viable option. However, discussions would have to take place with the State of Idaho to use their easement as part of the corridor and mission impact would need to be evaluated if a specific request was made to the Department of Energy, Idaho Operations Office. Option 3, in this document, is a combination of Options 1 and 2. This option provides the most flexibility to minimize impacts to INL missions. As with the other two options, discussions and agreements with the State of Idaho would be needed and any specific route would need to be thoroughly evaluated for impact, implementation, and operability beyond just a strategy.

John Reisenauer

2011-05-01T23:59:59.000Z

248

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Broader source: Energy.gov (indexed) [DOE]

maintain electric transmission facilities at the U.S. - Canada Border. SOULE RIVER HYDROELECTRIC PROJECT More Documents & Publications Application for Presidential Permit OE...

249

Application for Presidential Permit OE Docket No. PP-362 Champlain...  

Broader source: Energy.gov (indexed) [DOE]

: Record of Decision for Issuing a Presidential Permit for the CHPE Transmission Line Project: Federal Register Notice, Volume 79, No. 190 - Oct. 1, 2014 Application for...

250

Application for presidential permit OE Docket No. PP-371 Northern...  

Broader source: Energy.gov (indexed) [DOE]

for a Presidential Permit to construct a 1,200 MW high voltage direct current ("HVDC") transmission line (the "Application") from the Des Cantons substation in Quebec, to...

251

Application for Presidential Permit OE Docket No. PP-387 Soule River  

Broader source: Energy.gov (indexed) [DOE]

Project; Federal Register Notice, Volume 78, No. 154 - Project; Federal Register Notice, Volume 78, No. 154 - Aug. 9, 2013: Correction Application for Presidential Permit OE Docket No. PP-387 Soule River Hydroelectric Project; Federal Register Notice, Volume 78, No. 154 - Aug. 9, 2013: Correction The Department of Energy corrects a Notice of Application published in the Federal Register (76 FR 50726) on July 30, 2013, to revise the DOE point of contact and program Web site. Federal Register Notice. PP-387 Soule Hydro FRN Correction.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application for Presidential Permit OE Docket No. PP-387 Soule Hydro:

252

Comments on Docket ID: DOE-HQ-2011-0014 | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

on Docket ID: DOE-HQ-2011-0014 on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. The signatories of this letter, collectively referred to herein as the California Investor Owned Utilities (CA IOUs) represent some of the largest utility companies in the Western United States, serving over 35 million customers. Comments on Docket ID: DOE-HQ-2011-0014 More Documents & Publications FINAL CA IOU Comment Letter RFI Regulatory Burden O:\IM-20\E-Government Program Office\FDMS\FDMS

253

District of Columbia Public Service Commission. Docket No. EO-05-01 Pepco  

Broader source: Energy.gov (indexed) [DOE]

District of Columbia Public Service Commission. Docket No. EO-05-01 District of Columbia Public Service Commission. Docket No. EO-05-01 Pepco Response to the City of Alexandria's Supplemental Comments District of Columbia Public Service Commission. Docket No. EO-05-01 Pepco Response to the City of Alexandria's Supplemental Comments Docket No. EO-05-01: In accordance with Order No. 202-06-01, issued by the Department of Energy ("DOE") on February 17, 2006, Potomac Electric Power Company ("Pepoo") hereby submits this Response to City of Alexandria Supplemental Comments filed March 23. On or about March 23, 2006, several parties, including the City of Alexandria, filed comments in response to Order No. 202-06-1. The City of Alexandria's Supplemental Comments offer several purported alternatives to maintain

254

Application to Export Electric Energy OE Docket No. EA-327-A DC Energy LLC:  

Broader source: Energy.gov (indexed) [DOE]

Energy LLC: Federal Register Notice, Volume 77, No. 102 - May 25, 2012 Energy LLC: Federal Register Notice, Volume 77, No. 102 - May 25, 2012 Application to Export Electric Energy OE Docket No. EA-327-A DC Energy LLC: Federal Register Notice, Volume 77, No. 102 - May 25, 2012 Application from DC Energy to export electric energy to Canada. Federal Register Notice. EA-327_A DC Energy CN.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-321-A to EA-325-A Emera Energy Svcs. Subsidiaries: Federal Register Notice, Volume 77, No. 102 - May 25, 2012 Application to Export Electric Energy OE Docket No. EA-386 IPR-GDF SUEZ Energy Marketing (GSEMNA): Federal Register Notice, Volume 77, No. 129 - July 5, 2012 Application to export electric energy OE Docket No. EA-315-A BP Energy: Federal Register Notice Volume 76, No. 217 - Nov. 9, 2011

255

DOE 10 CFR Part 429, Docket Number: EERE-2010-BT-CE-0014, RIN  

Broader source: Energy.gov (indexed) [DOE]

DOE 10 CFR Part 429, Docket Number: EERE-2010-BT-CE-0014, DOE 10 CFR Part 429, Docket Number: EERE-2010-BT-CE-0014, RIN 1904-AC23, Federal Register Vol. 76, No. 75, 21813-15 (Tuesday, April 19, 2011), Notice of Proposed Rule for Energy Conservation Program: Certification, Compliance, and Enforcement fo DOE 10 CFR Part 429, Docket Number: EERE-2010-BT-CE-0014, RIN 1904-AC23, Federal Register Vol. 76, No. 75, 21813-15 (Tuesday, April 19, 2011), Notice of Proposed Rule for Energy Conservation Program: Certification, Compliance, and Enforcement fo DOE 10 CFR Part 429, Docket Number: EERE-2010-BT-CE-0014, RIN 1904-AC23, Federal Register Vol. 76, No. 75, 21813-15 (Tuesday, April 19, 2011), Notice of Proposed Rule for Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment.

256

Comments on Docket ID: DOE-HQ-2011-0014 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Comments on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. The signatories of this letter, collectively referred to herein as the California Investor Owned Utilities (CA IOUs) represent some of the largest utility companies in the Western United States, serving over 35 million customers. Comments on Docket ID: DOE-HQ-2011-0014 More Documents & Publications FINAL CA IOU Comment Letter RFI Regulatory Burden O:\IM-20\E-Government Program Office\FDMS\FDMS

257

Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy  

Broader source: Energy.gov (indexed) [DOE]

AEP Response to Sierra's Club Response for Temporary AEP Response to Sierra's Club Response for Temporary Emergency Authorization Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: AEP Response to Sierra's Club Response for Temporary Emergency Authorization Application from AEP Energy Partners to export electric energy to Mexico. AEP Response to Sierra Club response for Temp Emergency Authorization.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: Sierra's Club Opposition to AEP Temporary Emergency Authorization Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: Comments of Sierra Club Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners, Inc: Emergency Filing from AEP Requesting Temporary Export

258

Application to Export Electric Energy OE Docket No. EA-290-B Ontario Power  

Broader source: Energy.gov (indexed) [DOE]

Generation: Federal Register Notice Volume 76, No. 41 - Mar. Generation: Federal Register Notice Volume 76, No. 41 - Mar. 2, 2011 Application to Export Electric Energy OE Docket No. EA-290-B Ontario Power Generation: Federal Register Notice Volume 76, No. 41 - Mar. 2, 2011 Application from Ontario Power Generation to export electric energy to Canada. Federal Register Notice Vol 76 No 41 EA-290-B Ontario Power Generation More Documents & Publications Application to Export Electric Energy OE Docket No. EA-297-B SESCO Enterprises, Canada Ltd: Federal Register Notice Volume 76, No. 41 - Mar. 2, 2011 Application to Export Electric Energy OE Docket No. EA-209-C Cargill Power Markets: Federal Register Notice Volume 76, No. 66 - Apr. 6, 2011 Application to export electric energy OE Docket No. EA-220-C NRG Power Marketing LLC: Federal Register Notice Volume 75, No. 234 - Dec. 7, 2010

259

Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy  

Broader source: Energy.gov (indexed) [DOE]

Inc.:Answer of AEP Energy to Sierra Club's Motion to Inc.:Answer of AEP Energy to Sierra Club's Motion to Intervene and Protest Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc.:Answer of AEP Energy to Sierra Club's Motion to Intervene and Protest Application from AEP Energy Partner's Inc to export electric energy to Mexico. Answer of AEP to Sierra Club's Motion to Intervene 2-24-12.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: Comments of Sierra Club Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: AEP Response to Sierra's Club Response for Temporary Emergency Authorization Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: Sierra's Club Opposition to AEP Temporary Emergency

260

Application to Export Electric Energy OE Docket No. EA-345-A New Brunswick  

Broader source: Energy.gov (indexed) [DOE]

Federal Register Notice, Volume 78, No. Federal Register Notice, Volume 78, No. 208 - Oct. 28, 2013 Application to Export Electric Energy OE Docket No. EA-345-A New Brunswick Energy Marketing Corp: Federal Register Notice, Volume 78, No. 208 - Oct. 28, 2013 Application from New Brunswick Energy Marketing Corp to export electric energy to Canada. Federal Register Notice. EA-345-A NBEMC CN.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-388 TEC Energy Inc.: Federal Register Notice, Volume 78, No. 208 - Oct. 18, 2013 Application to Export Electric Energy OE Docket No. EA-258-D Brookfield Energy Marketing Inc.: Federal Register Notice, Volume 78. No. 213 - Nov. 4, 2013 Application to Export Electric Energy OE Docket No. EA-338-A Shell Energy North America (US), L.P.: Federal Register Notice, Volume 78, No. 45 -

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Application to Export Electric Energy OE Docket No. EA-145-D Powerex  

Broader source: Energy.gov (indexed) [DOE]

D D Powerex Corporation: Federal Register Notice Volume 73, No. 227 - Nov. 28, 2008 Application to Export Electric Energy OE Docket No. EA-145-D Powerex Corporation: Federal Register Notice Volume 73, No. 227 - Nov. 28, 2008 Application from Powerex Corporation to export electric energy to Mexico. Federal Register Notice Vol 73 No 227 EA-145-D Powerex Corporation More Documents & Publications Application to export electric energy OE Docket No. EA-164-C Constellation Energy Commodities Group, Inc: Federal Register Notice Volume 74, No. 151 - Aug. 7, 2009 Application to export electric energy OE Docket No. EA-220-C NRG Power Marketing LLC: Federal Register Notice Volume 75, No. 234 - Dec. 7, 2010 Application to Export Electric Energy OE Docket No. EA-297-B SESCO

262

Application to Export Electric Energy OE Docket No. EA-98-M WSPP Inc:  

Broader source: Energy.gov (indexed) [DOE]

Inc: Federal Register Notice, Volume 77, No. 65 - April 4, 2012 Inc: Federal Register Notice, Volume 77, No. 65 - April 4, 2012 Application to Export Electric Energy OE Docket No. EA-98-M WSPP Inc: Federal Register Notice, Volume 77, No. 65 - April 4, 2012 Application from WSPP Inc. to export electric energy to Canada. Federal Register Notice. EA-98-M WSPP CN.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-296-B Rainbow Energy Marketing Corp: Federal Register Notice, Volume 77, No. 66 - April 4, 2012 Application to Export Electric Energy OE Docket No. EA-321-A to EA-325-A Emera Energy Svcs. Subsidiaries: Federal Register Notice, Volume 77, No. 102 - May 25, 2012 Application to Export Electric Energy OE Docket No. EA-327-A DC Energy LLC: Federal Register Notice, Volume 77, No. 102 - May 25, 2012

263

Application to Export Electric Energy OE Docket No. EA-209-C...  

Broader source: Energy.gov (indexed) [DOE]

C Cargill Power Markets: Federal Register Notice Volume 76, No. 66 - Apr. 6, 2011 Application to Export Electric Energy OE Docket No. EA-209-C Cargill Power Markets: Federal...

264

Application to Export Electric Energy OE Docket No. EA-327-A...  

Broader source: Energy.gov (indexed) [DOE]

77, No. 102 - May 25, 2012 Application to Export Electric Energy OE Docket No. EA-386 IPR-GDF SUEZ Energy Marketing (GSEMNA): Federal Register Notice, Volume 77, No. 129 - July...

265

Application to Export Electric Energy OE Docket No. EA-98-M WSPP...  

Broader source: Energy.gov (indexed) [DOE]

Western Systems Power Pool Application to Export Electric Energy OE Docket No. EA-386 IPR-GDF SUEZ Energy Marketing (GSEMNA): Federal Register Notice, Volume 77, No. 129 - July...

266

Application to Export Electric Energy OE Docket No. EA-249-C...  

Broader source: Energy.gov (indexed) [DOE]

Export Electric Energy OE Docket No. EA-249-C Exelon Generation Company, LLC: Federal Register Notice, Volume 79, No. 125 - June 30, 2014 Application to Export Electric Energy OE...

267

Application to Export Electric Energy OE Docket No. EA-97-D Portland...  

Broader source: Energy.gov (indexed) [DOE]

97-D Portland General Electric Company: Federal Register Notice, Volume 79, No. 103 - May 29, 2014 Application to Export Electric Energy OE Docket No. EA-97-D Portland General...

268

Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 Ex partecommunication...  

Broader source: Energy.gov (indexed) [DOE]

Ex parte communication Meeting of May 16, 2013 Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 Ex parte communication Meeting of May 16, 2013 This memorandum for the record...

269

Docket No. EERE-2011-BT-NOA-0067 and RIN Number 1904-AC52 Ex...  

Broader source: Energy.gov (indexed) [DOE]

1-BT-NOA-0067 and RIN Number 1904-AC52 Ex parte Communication Docket No. EERE-2011-BT-NOA-0067 and RIN Number 1904-AC52 Ex parte Communication This memorandum for the record...

270

Docket No. EERE- 2008-BT-STD-0005, RIN 1904-AB57 Ex partecommunicatio...  

Broader source: Energy.gov (indexed) [DOE]

RIN 1904-AB57 Ex parte communication DOE Meeting of June 13, 2012 Docket No. EERE- 2008-BT-STD-0005, RIN 1904-AB57 Ex parte communication DOE Meeting of June 13, 2012...

271

Application to export electric energy OE Docket No. EA-227-A...  

Broader source: Energy.gov (indexed) [DOE]

7-A New York Independent System Operator, Inc: Federal Register Notice Volume 66, No. 231 - Nov. 30, 2001 Application to export electric energy OE Docket No. EA-227-A New York...

272

Application to Export Electric Energy OE Docket No. EA-216-C...  

Broader source: Energy.gov (indexed) [DOE]

6-C TransAlta Energy Marketing (U.S) Inc . Canadian Electrical Association Comments Application to Export Electric Energy OE Docket No. EA-216-C TransAlta Energy Marketing (U.S)...

273

Application to Export Electric Energy OE Docket No. EA-357 Hunt...  

Broader source: Energy.gov (indexed) [DOE]

7 Hunt Electric Power Marketing, L.L.C.: Federal Register Notice Volume 74, No. 117 - Jun. 19, 2009 Application to Export Electric Energy OE Docket No. EA-357 Hunt Electric Power...

274

Application to Export Electric Energy OE Docket No. EA-386 IPR...  

Broader source: Energy.gov (indexed) [DOE]

Suez Energy Marketing (Gsemna) Application to Export Electric Energy OE Docket No. EA-386 IPR-GDF Suez Energy Marketing (Gsemna) Application from IPR-GDF SUEZ (GSEMNA) to export...

275

Application to export electric energy OE Docket No. EA-216-C...  

Broader source: Energy.gov (indexed) [DOE]

6-C TransAlta Energy Marketing (U.S) Inc: Federal Register Notice Volume 76, No. 14 - Jan. 21, 2011 Application to export electric energy OE Docket No. EA-216-C TransAlta Energy...

276

Application to export electric energy OE Docket No. EA-220-C...  

Broader source: Energy.gov (indexed) [DOE]

20-C NRG Power Marketing LLC Application to export electric energy OE Docket No. EA-220-C NRG Power Marketing LLC Application from NRG Power Marketing LLC to export electric energy...

277

Application to Export Electric Energy OE Docket No. EA-260-E...  

Broader source: Energy.gov (indexed) [DOE]

60-E CP Energy Marketing (US) Inc. Application to Export Electric Energy OE Docket No. EA-260-E CP Energy Marketing (US) Inc. Application from CP Energy Marketing to export...

278

Application to Export Electric Energy OE Docket No. EA-258-D...  

Broader source: Energy.gov (indexed) [DOE]

58-D Brookfield Energy Marketing Inc.: Federal Register Notice, Volume 78. No. 213 - Nov. 4, 2013 Application to Export Electric Energy OE Docket No. EA-258-D Brookfield Energy...

279

Application to Export Electric Energy OE Docket No. EA-357-A...  

Broader source: Energy.gov (indexed) [DOE]

2014 Application to Export Electric Energy OE Docket No. EA-357-A Hunt Electric Power Marketing, L.L.C: Federal Register Notice, Volume 79, No. 87 - May 6, 2014 Application from...

280

Application to export electric energy OE Docket No. EA-216-C...  

Broader source: Energy.gov (indexed) [DOE]

16-C TransAlta Energy Marketing (U.S) Inc Application to export electric energy OE Docket No. EA-216-C TransAlta Energy Marketing (U.S) Inc Application from TransAlta Energy...

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Application to Export Electric Energy OE Docket No. EA-401 Lonestar...  

Broader source: Energy.gov (indexed) [DOE]

LLC Application to Export Electric Energy OE Docket No. EA-401 Lonestar Power Marketing LLC Application from Lonestar to export electric energy to Mexico. EA-401 Lonestar (MX).pdf...

282

Application to Export Electric Energy OE Docket No. EA-264-C...  

Broader source: Energy.gov (indexed) [DOE]

ENMAX Energy Marketing Inc.: Federal Register Notice, Volume 79, No. 116 - June 17, 2014 Application to Export Electric Energy OE Docket No. EA-264-C ENMAX Energy Marketing Inc.:...

283

Application to Export Electric Energy OE Docket No. EA-348-B...  

Broader source: Energy.gov (indexed) [DOE]

Application to Export Electric Energy OE Docket No. EA-348-B NextEra Energy Power Marketing, LLC.: Federal Register Notice, Volume 79, No. 7 - Jan. 10, 2014 Application from...

284

Application to Export Electric Energy OE Docket No. EA-357-A...  

Broader source: Energy.gov (indexed) [DOE]

C. Application to Export Electric Energy OE Docket No. EA-357-A Hunt Electric Power Marketing, L.L.C. Application from Hunt Electric to export electric energy to Mexico. EA-357-A...

285

Application to export electric energy OE Docket No. EA-348 FPL...  

Broader source: Energy.gov (indexed) [DOE]

export electric energy OE Docket No. EA-348 FPL Energy Power Marketing Inc: Federal Register Notice Volume 74, No. 15 - Jan. 26, 2009 Application to export electric energy OE...

286

Application to Export Electric Energy OE Docket No. EA-348-B...  

Broader source: Energy.gov (indexed) [DOE]

LLC Application to Export Electric Energy OE Docket No. EA-348-B NextEra Energy Power Marketing, LLC Application from NextEra Energy to export electric energy to Canada. EA-348-B...

287

Application to Export Electric Energy OE Docket No. EA-384 NRG...  

Broader source: Energy.gov (indexed) [DOE]

LLC Application to Export Electric Energy OE Docket No. EA-384 NRG Power Marketing LLC Application from NRG Power Mktg to export electric energy to Mexico. EA-384 NRG Power Mktg...

288

Application to Export Electric Energy OE Docket No. EA-384 NRG...  

Broader source: Energy.gov (indexed) [DOE]

- Feb. 27, 2012 Application to Export Electric Energy OE Docket No. EA-384 NRG Power Marketing LLC: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Application from NRG...

289

Application to Export Electric Energy OE Docket No. EA-386 IPR...  

Broader source: Energy.gov (indexed) [DOE]

SUEZ Energy Marketing (GSEMNA): Federal Register Notice, Volume 77, No. 129 - July 5, 2012 Application to Export Electric Energy OE Docket No. EA-386 IPR-GDF SUEZ Energy Marketing...

290

Application to export electric energy OE Docket No. EA-220-C...  

Broader source: Energy.gov (indexed) [DOE]

20-C NRG Power Marketing LLC: Federal Register Notice Volume 75, No. 234 - Dec. 7, 2010 Application to export electric energy OE Docket No. EA-220-C NRG Power Marketing LLC:...

291

Application to Export Electric Energy OE Docket No. EA-338-A...  

Broader source: Energy.gov (indexed) [DOE]

: Federal Register Notice, Volume 78, No. 45 - March 7, 2013 Application to Export Electric Energy OE Docket No. EA-338-A Shell Energy North America (US), L.P.: Federal Register...

292

Application to Export Electric Energy OE Docket No. EA-196-D...  

Broader source: Energy.gov (indexed) [DOE]

Power: Federal Register Notice, Volume 78, No. 89 - May 8, 2013 Application to Export Electric Energy OE Docket No. EA-196-D Minnesota Power: Federal Register Notice, Volume 78,...

293

Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy  

Broader source: Energy.gov (indexed) [DOE]

Sierra's Club Opposition to AEP Temporary Emergency Sierra's Club Opposition to AEP Temporary Emergency Authorization Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: Sierra's Club Opposition to AEP Temporary Emergency Authorization Application from AEP Energy Partners Inc. to export electric energy to Mexico. Sierra's Club Opposition to AEP Request for Temporary Emergency Authorization 2-17-12.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: AEP Response to Sierra's Club Response for Temporary Emergency Authorization Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: Comments of Sierra Club Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners, Inc: Emergency Filing from AEP Requesting Temporary Export

294

Application to Export Electric Energy OE Docket No. EA-145-E Powerex  

Broader source: Energy.gov (indexed) [DOE]

Corporation: Federal Register Notice, Volume 78, No. 213 - Nov. 4, Corporation: Federal Register Notice, Volume 78, No. 213 - Nov. 4, 2013 Application to Export Electric Energy OE Docket No. EA-145-E Powerex Corporation: Federal Register Notice, Volume 78, No. 213 - Nov. 4, 2013 Application from Powerex Corp to transmit electric energy to Mexico. Federal Register Notice. EA-145-E Powerex Corp (MX).pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-258-D Brookfield Energy Marketing Inc.: Federal Register Notice, Volume 78. No. 213 - Nov. 4, 2013 Application to Export Electric Energy OE Docket No. EA-338-A Shell Energy North America (US), L.P.: Federal Register Notice, Volume 78, No. 45 - March 7, 2013 Application to Export Electric Energy OE Docket No. EA-336-A ConocoPhillips Company: Federal Register Notice, Volume 78, No. 33 - Feb. 19, 2013

295

Application to Export Electric Energy OE Docket No. EA-296-A Rainbow Energy  

Broader source: Energy.gov (indexed) [DOE]

Corporation: Federal Register Notice Volume 72, Corporation: Federal Register Notice Volume 72, No. 158 - Aug. 16, 2007 Application to Export Electric Energy OE Docket No. EA-296-A Rainbow Energy Marketing Corporation: Federal Register Notice Volume 72, No. 158 - Aug. 16, 2007 Application from Rainbow Energy Marketing Corporation to export energy to Canada. Federal Register Notice Vol 72 No 158 EA-296-A Rainbow Energy Marketing Corporation More Documents & Publications Application to Export Electric Energy OE Docket No. EA-328 RBC Energy Services L.P.: Federal Register Notice Volume 72, No. 158 - Aug. 16, 2007 Application to Export Electric Energy OE Docket No. EA-296-B Rainbow Energy Marketing Corp: Federal Register Notice, Volume 77, No. 66 - April 4, 2012 Application to Export Electric Energy OE Docket No. EA-98-M WSPP Inc:

296

An Analysis of PM and NOx Train Emissions in the Alameda Corridor, CA  

E-Print Network [OSTI]

5. Ballester, F. Air Pollution and Health: An Overview WithAir Pollution and Mortality, Special Report, Health Effectshealth impacts of freight operations in the corridor could be quite extensive. Estimates of air pollution

Sangkapichai, Mana; Saphores, Jean-Daniel M; Ritchie, Stephen G.; You, Soyoung Iris; Lee, Gunwoo

2008-01-01T23:59:59.000Z

297

An Analysis of PM and NOx Train Emissions in the Alameda Corridor, CA  

E-Print Network [OSTI]

Authority. Number of Trains Running on the Alameda Corridor.An Analysis of PM and NO x Train Emissions in the Alamedaefficient than trucks, trains contribute heavily to regional

Sangkapichai, Mana; Saphores, Jean-Daniel M; Ritchie, Stephen G.; You, Soyoung Iris; Lee, Gunwoo

2008-01-01T23:59:59.000Z

298

I-65, America's First BioFuels Corridor: Timeline and Map  

Broader source: Energy.gov [DOE]

At the May 1, 2008 joint quarterly Web conference of DOE's Biomass and Clean Cities programs, Julie Howe (Indiana Office of Energy & Defense Development) described the I-65 Corridor Project.

299

Feasibility of an Aeronautical Mobile Ad Hoc Network Over the North Atlantic Corridor  

E-Print Network [OSTI]

Aerospace Center (DLR), Munich, Germany Email: {Daniel attractive scenario, the North Atlantic Corridor, and use realistic flight data to extract statistics about. INTRODUCTION Today's civil aviation airliners are typically equipped with a set of data communications

Schindelhauer, Christian

300

Workers Demolish Reactor Support Facility as Part of River Corridor Contract  

Broader source: Energy.gov [DOE]

RICHLAND, Wash. – EM’s Richland Operations Office and cleanup contractor Washington Closure Hanford recently completed the cleanout and demolition of the last reactor support facility as part of the River Corridor Closure Contract.

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Creating sustainable air rights development over highway corridors : lessons from the Massachusetts Turnpike in Boston  

E-Print Network [OSTI]

Research and practice have shown that air rights development over highway corridors in America's cities is not only feasible, but desirable. As planners, policy makers and consumers attempt to curb the sprawling development ...

Campbell, Bonnie E., 1977-

2004-01-01T23:59:59.000Z

302

Energy Corridors on Federal Lands | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

transmission and distribution facilities on Federal lands in the 11 contiguous Western States (Arizona, California, Colorado, Idaho, Montana, Nevada, New Mexico, Oregon,...

303

I-5 Corridor Reinforcement Project Fact Sheet -- Keeping the...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposed New Substation Proposed Route Segments Segments no longer being considered BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

304

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40)  

Broader source: Energy.gov (indexed) [DOE]

9, 2002 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Allston-Keeler 500 kV Transmission Line ROW exclusive to BLM lands between 8/4 through 27/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 150 feet. Location: The ROW is located in Washington and Columbia County, in the State of Oregon, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

305

River Corridor Project Workplace Air Monitoring Technical Basis  

SciTech Connect (OSTI)

This document provides the technical basis by which the workplace air monitoring and sampling program is operated in the River Corridor Project (RCP). Revision 2 addresses and incorporates changes in the air monitoring program drivers and implementing documents which occurred after the previous revision was issued. This revision also includes an additional RCP project to make Revision 2 applicable to the entire RCP. These changes occurred in the following areas: (1) Changes resulting from the conversion of the Hanford Site Radiological Control Manual (HSRCM-1) into the Project Hanford Radiological Control Manual (F-5173). HNF-5173 is now the implementing document for 10CFR835. (2) Changes resulting from the issue of new and revised Hanford Site implementing procedures. (3) Changes resulting from the issue of new and revised, as well as the cancellation of RCP implementing procedures. (4) Addition of the 200 Area Accelerated Deactivation Project (ADP). (5) Modification of some air sampling/monitoring locations to better meet the needs of facility operations. (6) Changes resulting from the RCP reorganization.

MANTOOTH, D.S.

2001-01-17T23:59:59.000Z

306

EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County...  

Broader source: Energy.gov (indexed) [DOE]

and Cowlitz and Clark Counties, Washington SUMMARY This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from...

307

Placing power linres : GIS helps site energy corridors.  

SciTech Connect (OSTI)

Turn the lights on when you enter a room, then turn the lights off when you leave. Most of us repeat this sequence many times each day, and never give it another thought. But that seemingly simple light switch on the wall connects us to one of the most complex systems in the world: the electrical grid. Most of the United States is served by a highly reliable and adequate supply of electrical power, which is distributed through a grid of thousands of miles of electricity-transmission lines. However, as the electricity-supply infrastructure ages and consumer demand for electricity grows, the capacity to deliver electrical power hasn't kept pace with demand, and upgrading the electrical-transmission grid has become a more pressing need. From 1988-1998, demand for transmission grew by 30 percent while transmission grew by only 15 percent. From 1999-2009, demand grew by 20 percent and transmission by only 3 percent Despite a short-term decline related to the economic downturn and improved efficiency, U.S. energy consumption is expected to increase by 14 percent between 2008 and 2035. This growth will drive the need to develop viable routes for new transmission lines. Because transmission lines extend over large distances, they typically cross many federal, tribal, state, local and private land jurisdictions, each with a complex and varying set of siting issues and land-management practices. And as the existing grid needs improvement to meet growing demand, the U.S. is rapidly developing renewable energy sources, particularly solar and wind energy, often in areas far removed from existing electricity-transmission infrastructure and energy-consumption areas.

Kuiper, J. A.; Cantwell, B.; Hlohowskyj, I.; Moore, H. R. (Environmental Science Division)

2011-08-01T23:59:59.000Z

308

Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.  

SciTech Connect (OSTI)

Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

309

(DOE/EIS-0285/SA-105): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (08/22/02)  

Broader source: Energy.gov (indexed) [DOE]

2, 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 105 Elbe Tap to Alder-LaGrande No. 1 James Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elbe Tap to Alder-LaGrande No.1 and 115kV transmission line from structure 1/1 through structure 7/17. Corridor width varies. The project area is located within Whatcom County, Washington. Location: Transmission line is located at and west of Elbe, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing

310

COMM-OPINION-ORDER, 75 FERC 61,208, Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and  

E-Print Network [OSTI]

-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities, Docket Nos. RM95-8-000 and RM94-7-001, (May 29, 1996) COPYRIGHT 1999, CCH Incorporated Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities

Laughlin, Robert B.

311

National Electric Transmission Congestion Study 2006 Executive Summary  

Broader source: Energy.gov (indexed) [DOE]

EXECUTIVE EXECUTIVE SUMMARY AUGUST 2006 U.S. Department of Energy NATIONAL ELECTRIC TRANSMISSION CONGESTION STUDY EXECUTIVE SUMMARY AUGUST 2006 U.S. Department of Energy Executive Summary Section 1221(a) of the Energy Policy Act of 2005 amended the Federal Power Act (FPA) by adding a new section 216 to that Act. FPA section 216(a) di- rected the Secretary of Energy to conduct a nation- wide study of electric transmission congestion 1 by August 8, 2006. Based upon the congestion study, comments thereon, and considerations that include economics, reliability, fuel diversity, national en- ergy policy, and national security, the Secretary may designate "any geographic area experiencing electric energy transmission capacity constraints or congestion that adversely affects customers as a na- tional interest electric transmission corridor." The national congestion study

312

Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages |  

Broader source: Energy.gov (indexed) [DOE]

Further Notice of 230kV Circuit Planned Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Pursuant to the United States Department of Energy Order No. 202-05-03, issued December 20, 2005 directing Mirant Potomac River to generate electricity at Potomac River Generating Station, PEPCO hereby files this Further Notice of 230kV Circuit Planned Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages More Documents & Publications Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Re: Potomac River Generating Station Department of Energy Case No.

313

Application to Export Electric Energy OE Docket No. EA-338-A Shell Energy  

Broader source: Energy.gov (indexed) [DOE]

8-A Shell 8-A Shell Energy North America (US), L.P.: Federal Register Notice, Volume 78, No. 45 - March 7, 2013 Application to Export Electric Energy OE Docket No. EA-338-A Shell Energy North America (US), L.P.: Federal Register Notice, Volume 78, No. 45 - March 7, 2013 Application from Shell Energy to export electric energy to Mexico. Federal Register Notice. EA-338-A Shell Energy-MX.pdf More Documents & Publications Application to Export Electric Energy OE Doc No. EA-339-A Shell Energy North America (US), L.P.: Federal Register Notice, Volume 78, No. 45 - March 7, 2013 Application to Export Electric Energy OE Docket No. EA-258-D Brookfield Energy Marketing Inc.: Federal Register Notice, Volume 78. No. 213 - Nov. 4, 2013 Application to Export Electric Energy OE Docket No. EA-336-A ConocoPhillips

314

To: Mansueti, Lawrence Subject: DCPSC Complaint DOE Docket #EO-05-01  

Broader source: Energy.gov (indexed) [DOE]

Sent: Tuesday, November 15, 2005 6:18 PM To: Mansueti, Lawrence Subject: DCPSC Complaint DOE Docket #EO-05-01 Attached please find our letter regarding the DCPSC complaint that we ask you to please file for consideration in DOE's Docket #EO-05-01. Thank you. Elizabeth Chimento and Poul Hertel 1200 North Pitt Street Alexandria, Virginia November 14, 2005 Joseph T. Kelliher, Chairman Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: District of Columbia Public Service Commission Emergency Petition and Complaint Docket No. EL05-145-000 Dear Chairman Kelliher: In the continuing dialogue regarding the Potomac River Generating Station, it is

315

Docket No. EO-05-01: Letter Documenting Department of Energy Receipt of the  

Broader source: Energy.gov (indexed) [DOE]

Documenting Department of Energy Documenting Department of Energy Receipt of the Mirant Potomac River Compliance Plan Docket No. EO-05-01: Letter Documenting Department of Energy Receipt of the Mirant Potomac River Compliance Plan Docket No. EO-05-01: Letter documenting Department of Energy receipt of the Mirant Potomac River compliance plan, and informing Mirant that additional comments on the plan would be forthcoming. Docket No. EO-05-01: Letter Documenting Department of Energy Receipt of the Mirant Potomac River Compliance Plan More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Motion for Leave to Answer and Answer of Potomac Electric Power Company

316

Ex Parte Communication In Connection with DocketNo.EERE-2010-BT-STD-Q027  

Broader source: Energy.gov (indexed) [DOE]

0-BT-STD-Q027 Energy Efficiency Program for Certain 0-BT-STD-Q027 Energy Efficiency Program for Certain Commercial and Industrial Equipment Ex Parte Communication In Connection with DocketNo.EERE-2010-BT-STD-Q027 Energy Efficiency Program for Certain Commercial and Industrial Equipment This memorandum memorializes another communication involving a follow-up to the Motor Coalition's previous communications in connection with this proceeding and documented in a memorandum dated April18, 2012. ExParteMemo.pdf More Documents & Publications Ex Parte Communication In Connection with DocketNo.EERE-201D-BT-STD-Q027 Docket No. EERE-2010-BT-STD-0027 Energy Conservation Standards for Commercial and Industrial Electric Motors: Public Meeting and Availability of the Preliminary Technical Support Document 77 Fed. Reg. 43015 (July 23,

317

A B C D E F G H I J K RETI PHASE 2A TRANSMISSION LINE SEGMENT ANALYSIS  

E-Print Network [OSTI]

37 38 39 A B C D E F G H I J K RETI PHASE 2A TRANSMISSION LINE SEGMENT ANALYSIS MDPT_DESC_1 DESC D E F G H I J K RETI PHASE 2A TRANSMISSION LINE SEGMENT ANALYSIS IRMT_SCEJ_2 SCEJ_CAMI_1 SCEJ_PISG_1 Monument X Other Relevant Information (e.g., line size) ROW/Corridor Information 1 ROW no change X X X X 2

318

(DOE/EIS-0285/SA 108): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Satsop-Aberdeen #2 9/5/02  

Broader source: Energy.gov (indexed) [DOE]

8, 8, Satsop-Aberdeen #2. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Satsop-Aberdeen #2 230kV transmission line corridor from structure 1/1 through structure 11/5 (reference line). Other lines which are present in the proposed corridor are the Satsop-Aberdeen #3 230 kV, South Elma-Cosmopolis 115kV, and Aberdeen tap to South Elma-Cosmospolis 115kV. Right of way width averages 238 feet. Location: The project area is located in Grays Harbor County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 11 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide

319

2012 SG Peer Review - Recovery Act: LIPA Smart Energy Corridor Project - Ming Mui, LIPA  

Broader source: Energy.gov (indexed) [DOE]

Program Program Peer Review Meeting DE-OE0000220 LIPA Long Island Smart Energy Corridor Ming Mui and Sunil Katwala June 8, 2012 December 2008 LIPA Long Island Smart Energy Corridor Objective Life-cycle Funding ($K) Fiscal Years 2010 to 2015 DOE Funding $ 12,496K Total Project Cost $ 25,293K* Technical Scope (Insert graphic here) * Additional funding from LIPA and SUNY Research Foundation Smart Energy Corridor will: (1) Validate Smart Grid technologies; (2) Quantify Smart Grid costs and benefits; (3) Validate Smart Grid applications at a scale that can be readily adapted and replicated in individual homes and businesses. * Demonstrate Technolgy (DA, Sub Auto, AMI, DLC) * Marketing (TOU Rates, Webtools, Visualization) * Cyber Security (Vulneribility Testing & Hardening)

320

Draft Programmatic Environmental Impact Statement fo the Designation of Energy Corridors in the 11 Western States  

Broader source: Energy.gov (indexed) [DOE]

Draft WWEC PEIS September 2007 Draft WWEC PEIS September 2007 i DOCUMENT CONTENTS VOLUME I Executive Summary Chapter 1: Why Are Federal Agencies Proposing to Designate Energy Corridors in the West? Chapter 2: What Are the Alternatives Evaluated in This PEIS? Chapter 3: What Are the Potential Environmental Consequences of Corridor Designation and Land Use Plan Amendment? Chapter 4: How Are Cumulative Impacts Evaluated? Chapter 5: What Unavoidable Adverse Impacts Might Be Caused by Corridor Designation and Land Use Plan Amendment? Chapter 6: The Relationship between Local Short-Term Uses of the Environment and Long-Term Productivity Chapter 7: What Irreversible and Irretrievable Commitment of Resources Would Be Involved with Implementation of the Alternatives? Chapter 8: List of Preparers

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

DOE/EIS-0285/SA-134: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (Bandon-Rogue-GoldBeach)(3/24/03)  

Broader source: Energy.gov (indexed) [DOE]

4, 2003 4, 2003 REPLY TO ATTN OF: KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-134-Bandon-Rogue-GoldBeach) Ben Tilley Natural Resource Specialist - TFE/Alvey Proposed Action: Vegetation Management for the Bandon-Rogue-Gold Beach transmission line corridor. This corridor includes the Bandon-Rogue #1 115 kV transmission line from Bandon Substation to Rogue Substation and the Rogue-Gold Beach #1 and #2 115kV transmission lines, starting at Rogue Substation and ending at Gold Beach Substation. In addition the project includes adjacent portions of the Fairview-Rogue #1 230 kV Transmission Line. Location: The project is located in the BPA Eugene Region, Coos and Curry Counties, Oregon.

322

(DOE/EIS-0285/SA-36): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (01/22/02)  

Broader source: Energy.gov (indexed) [DOE]

24, 2002 24, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-38) Benjamin J. Tilley - TFE/Alvey Proposed Action: Vegetation Management along the Wendson-Tahkenith #1 & #2 1/1-20/4, Tahkenitch-Gardiner #1/1-2/3 and Tahkenitch-Reedsport #1/1-4/2 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 100 feet. Location: The ROW is located in Douglas and Lane County, OR, being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

323

(DOE/EIS-0285/SA-43): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Broader source: Energy.gov (indexed) [DOE]

February 27, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Lower Monumental - McNary 57/2 to 63/5, and Radar Tap 0/4 to 0/10 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 165 and 80 feet respectively. Location: The ROW is located in Umatilla and Franklin County, OR, being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

324

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

325

Buffalo Flat Service 115-KV Transmission Project : Environmental Assessment.  

SciTech Connect (OSTI)

BPA, in conjunction with Midstate Electric Cooperative (Midstate), proposed to construct two sections of a new 115-kV transmission line in central Oregon: one section from BPA's LaPine Substation to Midstate's Fort Rock Substation (BPA), and the other from Fort Rock Substation to the proposed US Air Force radar transmitter site at Buffalo Flat (Midstate). The proposed line would be a total of about 74 miles long, and of either wood or steel single-pole construction; it would parallel existing corridors and/or roads for much of the distance. 23 refs., 6 figs., 5 tabs.

United States. Bonneville Power Administration.

1987-07-01T23:59:59.000Z

326

Port competition and network polarization at the East Asian maritime corridor  

E-Print Network [OSTI]

1 Port competition and network polarization at the East Asian maritime corridor This paper Korea Maritime Institute (KMI) Logistics and Port Research Department Sangam-dong, Mapo-gu Seoul, Korea author halshs-00558856,version1-24Jan2011 #12;2 Port competition and network polarization at the East

Boyer, Edmond

327

Service Oriented Architecture for Monitoring Cargo in Motion Along Trusted Corridors  

E-Print Network [OSTI]

Service Oriented Architecture for Monitoring Cargo in Motion Along Trusted Corridors M. Kuehnhausen. It is built as a Service Oriented Architecture (SOA) using open web service specifications and Open Geospatial and the fundamental ideas behind a Service Oriented Architecture are explained in detail. The system was evaluated

Kansas, University of

328

Patch Isolation, Corridor Effects, and Colonization by a Resident Sparrow in a Managed Pine Woodland  

E-Print Network [OSTI]

Patch Isolation, Corridor Effects, and Colonization by a Resident Sparrow in a Managed Pine: The isolation of habitat patches is often cited as having a major impact on the dynamics of small populations occupying patches in a complex iandscape Few studie~ howet~, have provided field data demonstrating

329

Urban/industrial pollution for the New York CityWashington, D. C., corridor, 19961998  

E-Print Network [OSTI]

and Structure: Pollution--urban and regional (0305); 0365 Atmospheric Composition and Structure: TroposphereUrban/industrial pollution for the New York City­Washington, D. C., corridor, 1996­1998: 2. A study and Diagnostics Laboratory, National Oceanic and Atmospheric Administration, Boulder, Colorado, USA Received 11

330

Urban/industrial pollution for the New York CityWashington, D. C., corridor, 19961998  

E-Print Network [OSTI]

Atmospheric Composition and Structure: Pollution--urban and regional (0305); 0365 Atmospheric CompositionUrban/industrial pollution for the New York City­Washington, D. C., corridor, 1996­1998: 1 and Diagnostics Laboratory, National Oceanic and Atmospheric Administration, Boulder, Colorado, USA Received 11

331

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-151-Big Eddy-Ostrander 1  

Broader source: Energy.gov (indexed) [DOE]

8, 2003 8, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-151-Big Eddy-Ostrander 1 Ed Tompkins Natural Resource Specialist-TFO/LMT Proposed Action: Removal of danger trees along the Big Eddy-Ostrander-1 transmission line corridor. This corridor also includes segments of the Big Eddy-Troutdale, Ostrander-Troutdale, Big Eddy-McLoughlin and Bid Eddy-Chemawa transmission lines. Referencing the Big-Eddy- Ostrander-1 transmission line, the project extends from tower 39/3 to 72/2. The portion of the ROW extending from 39/3 west to 44/5+313 falls within the Zigzag Ranger District of the Mt. Hood National Forest, Clackamas County, Oregon. All work conducted

332

(DOE/EIS-0285/SA 84): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Monroe-Custer No.1 7/1/02  

Broader source: Energy.gov (indexed) [DOE]

July July 1, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 84 Monroe-Custer No.l Don Atkinson -- - TFN/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No. 1500kV transmission line from structure 61/1 through structure 88/4. This project includes contemporaneous vegetation management along the Monroe-Custer No. 2 500kV and the Arlington-Bellingham 230kV transmission line corridors which run parallel to the subject transmission line. Corridor width varies from 140 to 825 feet. (All structure locations referenced in this SA refer to the Monroe-Custer No. 1.) The project area is located within Whatcom County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the

333

6450-01-P, DOE 10 CFR Parts 430 and 431, Docket No. EERE-2010-BT-CE-0014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6450-01-P, DOE 10 CFR Parts 430 and 431, Docket No. 6450-01-P, DOE 10 CFR Parts 430 and 431, Docket No. EERE-2010-BT-CE-0014 RIN 1904-AC23, Draft Submission to Federal Register, Notice of Revisions to Energy Efficiency Enforcement Regulations, Request for Information/comment. 6450-01-P, DOE 10 CFR Parts 430 and 431, Docket No. EERE-2010-BT-CE-0014 RIN 1904-AC23, Draft Submission to Federal Register, Notice of Revisions to Energy Efficiency Enforcement Regulations, Request for Information/comment. 6450-01-P, DOE 10 CFR Parts 430 and 431, Docket No. EERE-2010-BT-CE-0014 RIN 1904-AC23, Draft Submission to Federal Register, Notice of Revisions to Energy Efficiency Enforcement Regulations, Request for Information/comment. Request for Information (RFI); request for comment regarding DOE's plan to expand and revise its existing energy efficiency enforcement regulations

334

CERTIFICATION DOCKET FOR THE F0RhqE.R SITE OF THE RADIOACTIVE LIQUID WASTE TREATMENT PLANT (TA-45)  

Office of Legacy Management (LM)

CERTIFICATION DOCKET CERTIFICATION DOCKET FOR THE F0RhqE.R SITE OF THE RADIOACTIVE LIQUID WASTE TREATMENT PLANT (TA-45) AND THE EFFLUENT RECEIVING AREAS OF ACID, PUEBLO, AND LOS ALAMOS CANYOM, LOS ALAMOS, NEW MEXICO DEPARTMENT OF ENERGY Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects -. CONTENTS A Page - Introduction to the Certification Docket for the Former Site of the Radioactive Liquid Waste Treatment Plant (TA-45) and the Effluent Receiving Areas of Acid, Pueblo, and Los Alamos Canyons, Los Alamos, New Mexico Description of the Formeriy Utilized Sites Program at the Former Site of the T.4-45 Treatment Plant and Acid, Pueblo, and Los Alamos Canyons Purpose Property Identification Docket Contents

335

Docket No's EERE-2010-BT-TP-0044 andEERE-2010-BT-STD-0043 Energy...  

Energy Savers [EERE]

EERE-2010-BT-STD-0043 Energy Conservation Program: Energy Conservation Standards and Test Procedures for HID Lamps Docket No's EERE-2010-BT-TP-0044 and EERE-2010-BT-STD-0043...

336

Docket No. EERE-2010-BT-STD-0027 Energy Conservation Standards for  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-BT-STD-0027 Energy Conservation 0-BT-STD-0027 Energy Conservation Standards for Commercial and Industrial Electric Motors: Public Meeting and Availability of the Preliminary Technical Support Document 77 Fed. Reg. 43015 (July 23, 2012) Docket No. EERE-2010-BT-STD-0027 Energy Conservation Standards for Commercial and Industrial Electric Motors: Public Meeting and Availability of the Preliminary Technical Support Document 77 Fed. Reg. 43015 (July 23, 2012) This memorandum memorializes a communication involving members of the Motor Coalition (industry and energy advocates) in connection with this proceeding. Letter Motor Coalition re DOE Motors Rule 13May2013.pdf More Documents & Publications EERE-2010-BT-STD-0027 Ex Parte Letter NEMA Motor Training re DOE Motors Rule 15 July 2013. Docket No's EERE-2010-BT-TP-0044 and

337

Docket No. EO-05-01: Letter from Kevin Kolevar, Director Office of  

Broader source: Energy.gov (indexed) [DOE]

from Kevin Kolevar, Director Office of from Kevin Kolevar, Director Office of Electricity Delivery and Energy Reliability, to Mr. Robert Driscoll, CEO Mirant Mid-Atlantic, LLC Docket No. EO-05-01: Letter from Kevin Kolevar, Director Office of Electricity Delivery and Energy Reliability, to Mr. Robert Driscoll, CEO Mirant Mid-Atlantic, LLC Docket No. EO-05-01: On December 20, 2005, the Secretary of Energy issued DOE Order No. 202-05-3, pursuant to section 202(c) of the Federal Power Act, 16 U.S.c. § 824a(c), ordering the operation of the Potomac River Generating Station (the Plant) owned by Mirant Potomac River, LLC (Mirant). DOE has determined that the operation of the Plant under Option A pursuant to DOE's January 4, 2006 instructions does not provide an adequate level of electric reliability to the Central D.C. area under current circumstances. Operation

338

Notices Docket Numbers: ER11-3935-000. Applicants: CL Power Sales Eight,  

Broader source: Energy.gov (indexed) [DOE]

2 Federal Register 2 Federal Register / Vol. 76, No. 131 / Friday, July 8, 2011 / Notices Docket Numbers: ER11-3935-000. Applicants: CL Power Sales Eight, LLC. Description: CL Power Sales Eight, LLC submits tariff filing per 35.37: CL Power Sales Eight, LLC Triennial MBR Update for the NE Region to be effective 6/30/2011. Filed Date: 06/29/2011. Accession Number: 20110629-5160. Comment Date: 5 p.m. Eastern Time on Monday, August 29, 2011. Docket Numbers: ER11-3936-000. Applicants: CP Power Sales Twenty, LLC. Description: CP Power Sales Twenty, LLC submits tariff filing per 35.37: CP Power Sales Twenty, LLC Triennial MBR Update for the NE Region to be effective 6/30/2011. Filed Date: 06/29/2011. Accession Number: 20110629-5161. Comment Date: 5 p.m. Eastern Time on Monday, August 29, 2011.

339

Transmission Investment: A Primer  

SciTech Connect (OSTI)

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

340

Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at...

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

(DOE/EIS-0285/SA-41): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Broader source: Energy.gov (indexed) [DOE]

February 27, 2002 February 27, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-41) William Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management around wood poles in Transmission Line ROW's in the Walla Walla Region (see attached checklist for identification). The proposed work will be accomplished in the indicated sections of the transmission line corridors with the easement width ranging from 0 to 200 feet. Location: The ROWs are located in Walla Walla Region (see checklist). Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation around

342

An Analysis of the health impacts from PM and NOx emissions resulting from train operations in the Alameda Corridor, CA  

E-Print Network [OSTI]

2009). Estimating PM and NOx Train Emissions in the AlamedaAuthority. Number of Trains Running on the Alameda Corridor.x emissions resulting from train operations in the Alameda

Sangkapichai, Mana; Saphores, Jean-Daniel M; Ogunseitan, Oladele; Ritchie, Stephen G.; You, Soyoung Iris; Lee, Gunwoo

2010-01-01T23:59:59.000Z

343

Draft Programmatic Environmental Impact Statement fo the Designation of Energy Corridors in the 11 Western States  

Broader source: Energy.gov (indexed) [DOE]

WWEC PEIS ES-1 October 2007 WWEC PEIS ES-1 October 2007 EXECUTIVE SUMMARY ES.1 WHY ARE FEDERAL AGENCIES PROPOSING TO DESIGNATE ENERGYCORRIDORS IN THE WEST? On August 8, 2005, the President signed into law the Energy Policy Act of 2005 (EPAct). In Subtitle F of EPAct, Congress set forth various provisions that would change the way certain federal agencies 1 (Agencies) coordinated to authorize the use of land for a variety of energy- related purposes. Section 368 of EPAct requires, among other things, the designation of energy corridors on federal lands in 11 western states 2 and the establishment of procedures to ensure that additional corridors are identified and designated as necessary and to expedite applications to construct or modify oil, gas, and

344

File:03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf | Open Energy  

Open Energy Info (EERE)

HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Jump to: navigation, search File File history File usage Metadata File:03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 31 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 14:14, 29 March 2013 Thumbnail for version as of 14:14, 29 March 2013 1,275 × 1,650 (31 KB) Alevine (Talk | contribs) 12:47, 23 October 2012 Thumbnail for version as of 12:47, 23 October 2012 1,275 × 1,650 (44 KB) Dklein2012 (Talk | contribs) 12:40, 23 October 2012 Thumbnail for version as of 12:40, 23 October 2012 1,275 × 1,650 (44 KB) Dklein2012 (Talk | contribs)

345

Usage of Electric Vehicle Supply Equipment Along the Corridors between the EV Project Major Cities  

SciTech Connect (OSTI)

The report explains how the EVSE are being used along the corridors between the EV Project cities. The EV Project consists of a nationwide collaboration between Idaho National Laboratory (INL), ECOtality North America, Nissan, General Motors, and more than 40 other city, regional and state governments, and electric utilities. The purpose of the EV Project is to demonstrate the deployment and use of approximately 14,000 Level II (208-240V) electric vehicle supply equipment (EVSE) and 300 fast chargers in 16 major cities. This research investigates the usage of all currently installed EV Project commercial EVSE along major interstate corridors. ESRI ArcMap software products are utilized to create geographic EVSE data layers for analysis and visualization of commercial EVSE usage. This research locates the crucial interstate corridors lacking sufficient commercial EVSE and targets locations for future commercial EVSE placement. The results and methods introduced in this research will be used by INL for the duration of the EV Project.

Mindy Kirkpatrick

2012-05-01T23:59:59.000Z

346

Optoelectronics 514 Transmission Hologram Transmission Hologram  

E-Print Network [OSTI]

Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

Collins, Gary S.

347

(DOE/EIS-0285-SA-115): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Shelton-Fairmount # 1-4 12/20/02  

Broader source: Energy.gov (indexed) [DOE]

0, 0, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 115, Shelton- Fairmount # 1-4. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Shelton Fairmount # 1-4 230kV & 115kV transmission lines corridor from structure 34/3 through structure 60/2 (reference line ADNO 8354). Right of way width averages 258 feet. Location: The project area is located in Jefferson County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 26 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and

348

(DOE/EIS-0285/SA-121): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-121): 2/12/03  

Broader source: Energy.gov (indexed) [DOE]

2, 2003 2, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-121 Murry-Custer No. 1 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Murry-Custer No.1 transmission line from structure 1/1 through structure 6/2. Corridor width is 125 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 77.5 acres of right-of-way, 6 miles of access road, and 48 structure sites will be

349

Supplement Analysis for the Transmission System Vegetation Management Program FEIT (DOE/EIS-0285/SA-95) Chehalis-Olympia No. 1 and Chehalis-Centralia No. 2  

Broader source: Energy.gov (indexed) [DOE]

5) 5) Chehalis-Olympia No.l and Chehalis-Centralia No. 2 James A. Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation management along the Chehalis-Olympia No. 1 and Chehalis-Centralia No. 2, 230kV transmission line. The project area is located within Lewis and Thurston Counties, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 29 miles of access roads and corridor will be treated. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line. See

350

(DOE/EIS-0285/SA-110): Supplement Analysis for the Transmission System Vegetation Management Program FEIS-Covington-Columbia No. 3) 10/2/02  

Broader source: Energy.gov (indexed) [DOE]

2, 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-110-Covington-Columbia No. 3 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Covington-Columbia No. 3, 230kV transmission lines from structure 1/1 through structure 12/1. Corridor width varies from 150 feet to 537.5 feet. The project area is located within King County, Washington. Location: The project area is located within King County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Approximately 568.4 acres of the right-of-way will be treated using selective and non-selective methods that include

351

(DOE/EIS-0285/SA-99): Supplement Analysis for the Transmission System Vegetation Management Program FEIS -Olympia-Grand Coulee No.1 8/29/02  

Broader source: Energy.gov (indexed) [DOE]

9, 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-99-Olympia-Grand Coulee No. 1 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Olympia-Grand Coulee No. 1, 287 kV transmission line from structure 53/4 through structure 64/1. Corridor width is 125 feet. Location: The project area is located within King County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Approximately 163 acres will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded

352

(DOE/EIS-0285/SA 118): Supplement Analysis for the Transmission System Vegetation Management Program EIS, Holcomb-Naselle 115kV)  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-SA 118, Holcomb - Naselle 115 kV. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. Right of way width averages 100 feet. Location: The project area is located in Pacific County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective

353

Transmission | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

354

Empirical Analysis of the Variability of Wind Generation in India: Implications for Grid Integration  

E-Print Network [OSTI]

2012. “Report on Green Energy Corridors: Transmission Plansystem. The Report on Green Energy Corridors documents the

Phadke, Amol

2014-01-01T23:59:59.000Z

355

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Broader source: Energy.gov (indexed) [DOE]

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

356

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Broader source: Energy.gov (indexed) [DOE]

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

357

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

358

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

359

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap  

Broader source: Energy.gov (indexed) [DOE]

5, 2003 5, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap Tom Murphy Natural Resource Specialist - TFS/Bell-1 Proposed Action: Vegetation Management for the East Ellensburg Tap, 1/6 to 3/19 Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line with no easement width. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Kittatas County, WA being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear unwanted vegetation in the rights-of-ways and around transmission line structures that may impede the operation and maintenance of the

360

(DOE/EIS-0285/SA-127): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Broader source: Energy.gov (indexed) [DOE]

KEP/4 KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-127- Eugene-Alvey#2 Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Eugene-Alvey 115 kV transmission line from structure 7/1 through structure 12/2m, and along portions of the following adjacent transmission lines: Hawkins-Alvey 115KV and Alvey-Lane 115KV. Location: The project is located in the BPA Eugene Region in Lane County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

(DOE/EIS-0285-SA-100): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 8/15/02  

Broader source: Energy.gov (indexed) [DOE]

5, 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-100) Joe Johnson Natural Resource Specialist TFS/Kalispell Proposed Action: Vegetation Management along the Libby-Conkelly, 1/2 to 26/4 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 125 feet to 250 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Lincoln and Flathead County, MT, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in

362

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-34) (12/3/01)  

Broader source: Energy.gov (indexed) [DOE]

3, 2001 3, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-34) Bill Erickson - TFP/Walla Walla Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the McNary-Ross Transmission Line ROW between 152/3+2120 to 153/4. The line is 345 kV Single Circuit Transmission Line (project includes adjacent N. Bonneville-Ross 230 kV Single Circuit Transmission Line) having a combined easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Skamania County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA).

363

Milford Wind Corridor Phase I (Clipper) Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Clipper) Wind Farm Clipper) Wind Farm Jump to: navigation, search Name Milford Wind Corridor Phase I (Clipper) Wind Farm Facility Milford Wind Corridor Phase I (Clipper) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner First Wind Developer First Wind Energy Purchaser Southern California Public Power Authority Location Milford UT Coordinates 38.52227°, -112.935262° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.52227,"lon":-112.935262,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

364

File:WSR process-flowchart-outside-corridor.pdf | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search File Edit History Facebook icon Twitter icon » File:WSR process-flowchart-outside-corridor.pdf Jump to: navigation, search File File history File usage File:WSR process-flowchart-outside-corridor.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 25 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 08:35, 22 October 2012 Thumbnail for version as of 08:35, 22 October 2012 1,275 × 1,650, 2 pages (25 KB) Dklein2012 (Talk | contribs)

365

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Ann Vennerbeck  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

366

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Anne Moschella  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

367

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Lorna Rose  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

368

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Lindsey Coombs  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

369

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Pamela Hanglin  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

370

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Maureen Quinn  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

371

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Roy Kjendal  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

372

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Pamela Hayes  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

373

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Erick Berglund, Jr.  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

374

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Susan Seitz  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

375

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Gina Neily  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

376

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Vickie Bedard  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

377

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Rana Klug  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

378

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Bruce Adami  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

379

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Jim Cannon  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

380

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from John Doane Sr.  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Serita Frey  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

382

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Robert Cote  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

383

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand  

Broader source: Energy.gov [DOE]

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada border.

384

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Dept. of Agriculture  

Broader source: Energy.gov [DOE]

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada border.

385

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority  

Broader source: Energy.gov [DOE]

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

386

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Nicholas Karakoudas  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

387

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Senator Lisa Murkowski  

Broader source: Energy.gov [DOE]

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada border.

388

(DOE/EIS-0285/SA 107): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Elma-Cosmopolis #1 9/5/02  

Broader source: Energy.gov (indexed) [DOE]

7, 7, Elma-Cosmopolis #1. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elma-Cosmopolis #1 115kV transmission line corridor from structure 11/7 through structure 20/3. Right of way width averages 100 feet. Location: The project area is located in Grays Harbor County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridors. Approximately 8 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 2.8 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites

389

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

390

Microsoft Word - PSEG Companies Comments in OE Docket No RRTT-IR-001.doc  

Broader source: Energy.gov (indexed) [DOE]

K. Richter K. Richter Assistant General Regulatory Counsel Regulatory Department 80 Park Plaza, T5C, Newark, NJ 07102-4194 tel: 973.430.6451 fax: 973.802.1267 email: david.richter@pseg.com March 28, 2012 VIA ELECTRONIC FILING Lamont Jackson Office of Electricity Delivery and Energy Reliability Mail Code OE-20 U.S. Department of Energy, 1000 Independence Avenue, SW. Washington, DC 20585 RE: DOE's Request for Information OE Docket No. RRTT-IR-001 Dear Mr. Jackson, Public Service Electric and Gas Company ("PSE&G") 1 , PSEG Power LLC ("PSEG Power") and PSEG Energy Resources & Trade LLC ("PSEG ER&T") (collectively referred to herein as the "PSEG Companies") respectfully submit the following comments in response to the Department of Energy's ("DOE") Request for

391

Notices DEPARTMENT OF ENERGY [OE Docket No. EA-318-B] Application To Export Electric Energy;  

Broader source: Energy.gov (indexed) [DOE]

4 Federal Register 4 Federal Register / Vol. 77, No. 6 / Tuesday, January 10, 2012 / Notices DEPARTMENT OF ENERGY [OE Docket No. EA-318-B] Application To Export Electric Energy; AEP Energy Partners, Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: AEP Energy Partners, Inc. (AEPEP) has applied to renew its authority to transmit electric energy from the United States to Mexico pursuant to section 202(e) of the Federal Power Act (FPA). DATES: Comments, protests, or motions to intervene must be submitted on or before February 9, 2012. ADDRESSES: Comments, protests, or motions to intervene should be addressed to: Christopher Lawrence, Office of Electricity Delivery and Energy Reliability, Mail Code: OE-20, U.S.

392

MEMORANDUM RE: Ex Parte Communications in Connection with Docket No. EERE-2010-BT-STD-0027  

Broader source: Energy.gov (indexed) [DOE]

May 21, 2013 May 21, 2013 Encl: Motor Coalition Presentation This memorandum memorializes a communication involving members of the Motor Coalition (industry and energy advocates) in connection with this proceeding. The Motor Coalition thanks the DOE for permitting us to meet with you on May 13 th , 2013 to discuss the Motor Coalition Petition for Direct Final Rule and the related Rulemaking for Electric Motor performance standards, which is the subject of the above docket number. Attendees of the May 13 th meeting were as follows: John Cymbalsky (DOE), Ashley Armstrong (DOE), Matthew Nardotti (Navigant), John Malinowski (Baldor), Emmanuel Agammloh (Advanced Energy), Kit Butler(Advanced Energy), Michael Kido (DOE), Jim Raba (DOE), Roger Daugherty (Baldor), Neal Elliott (ACEEE), Rob Boteler (Nidec), Michael Rivest (Navigant), Ami

393

Docket No. EERE-2008-BT-STD-0005. RIN 1904-AB57 | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2008-BT-STD-0005. RIN 1904-AB57 2008-BT-STD-0005. RIN 1904-AB57 Docket No. EERE-2008-BT-STD-0005. RIN 1904-AB57 This memorandum for the record provides a summary of a February 13, 2013 meeting with U.S. Department of Energy staff concerning DOE's proposed rulemaking regarding amended energy conservation standards for Class A external power supplies (EPSs) and new energy conservation standards for non-Class A EPSs and battery chargers. CEA Ex Parte Discussion_02212013.pdf More Documents & Publications Request for Information on Evaluating New Products for the Battery Chargers and External Power Supply Rulemaking - Ex Parte Communication HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers and External Power Supplies HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers and External

394

Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.  

SciTech Connect (OSTI)

The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

395

The Valley Fever Corridor Project The goals are twofold--to teach health care professionals in south-central  

E-Print Network [OSTI]

- long disability requiring extensive medical treatment. Valley Fever cost Arizona $86 million in 2007The Valley Fever Corridor Project The goals are twofold--to teach health care professionals in south-central Arizona, especially in Maricopa County, essential information about Valley Fever

Arizona, University of

396

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

397

Microsoft Word - DOE RFI on Transmission Planning - PGE Comments.DOC  

Broader source: Energy.gov (indexed) [DOE]

Comments of Pacific Gas & Electric Company Comments of Pacific Gas & Electric Company Department of Energy Request for Information on Transmission Permitting [OE Docket No. RRTT-IR-001] Pacific Gas & Electric Company (PG&E) appreciates the opportunity to respond to the questions from the Department of Energy (DOE) in its Request for Information (RFI) related to the permitting of transmission lines. The RFI lists six (6) questions, several of them with subparts. PG&E responds to the questions sequentially as they are listed in the RFI. As discussed in more detail below, increased alignment across the federal, state and local agencies for permitting and improved planning coordination would improve the development time for transmission and generation. Improved focus on planning would result in a more

398

(DOE/EIS-0285/SA-119): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/29/03  

Broader source: Energy.gov (indexed) [DOE]

9, 2003 9, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Snohomish-Murray No. 1 Transmission Line from structure 2/6 through structure 18/6. Right of way width is 95 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will

399

(DOE/EIS-0285/SA-122): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Broader source: Energy.gov (indexed) [DOE]

CSB-2 CSB-2 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-122- Bonneville-Alcoa Ed Tompkins, TFO/LMT Proposed Action: Vegetation Management for the Bonneville-Alcoa 115kV transmission line Location: The project is located in the BPA Olympia Region in Skamania and Clark Counties, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans

400

(DOE/EIS-0285/SA=32): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (11/15/01)  

Broader source: Energy.gov (indexed) [DOE]

November 15, 2001 November 15, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-32) Bill Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Re-vegetation Plot Study along the Lower Monumental-McNary Transmission Line ROW. The study area sections are located near structures 38/4 and 39/3. The line is a 500kV Single Circuit Transmission Line having an easement width of 165 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as indicated on the attached checklist. Location: The ROW is located in Walla Walla County, WA being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

(DOE/EIS-0285/SA-57): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/10/02  

Broader source: Energy.gov (indexed) [DOE]

0, 2002 0, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57) Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Trojan-Allston Transmission Lines 1 & 2 ROW between 1/1 and 9/1. The lines are 230 kV Single Circuit Transmission Lines having an easement width of 125 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

402

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20)(8/2/01)  

Broader source: Energy.gov (indexed) [DOE]

2, 2001 2, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20) Bill Erickson - TFP/Walla Walla - Natural Resource Specialist Jim Jellison - TFO/Olympia - Natural Resource Specialist Proposed Action: Vegetation Management along the McNary-Ross 161/1 to 166/5+346 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 175 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Clark County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

403

(DOE/EIS-0285-126): Supplement Analysis for the Transmission System Vegetation Management Program 2/19/03  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-126- Alvey Fairview Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Alvey Fairview 230kV transmission line from structure 1/1 through structure 64/7. Location: The project is located in the BPA Eugene Region in Coos, Douglas, and Lane Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

404

(DOE/EIS-0285/SA-11): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Broader source: Energy.gov (indexed) [DOE]

1) 1) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Covington-Maple Valley No. 2 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 150 feet. The proposed work will be accomplished in selected sections along the entire transmission line corridor. Location: The ROW is located in King County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with

405

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-141- SalemAlbany #2)  

Broader source: Energy.gov (indexed) [DOE]

1- SalemAlbany #2) 1- SalemAlbany #2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Salem Albany #2 115 kV transmission line from Salem Substation to Albany Substation. Location: The project is located in the BPA Eugene Region, within Marion, Polk, and Benton Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission

406

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-140- SalemAlbany1)  

Broader source: Energy.gov (indexed) [DOE]

0- SalemAlbany1) 0- SalemAlbany1) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Salem Albany #1 115 kV transmission line from Salem Substation to Albany Substation. Location: The project is located in the BPA Eugene Region, Marion, Linn, and Benton County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission

407

National Transmission Grid Study  

Broader source: Energy.gov (indexed) [DOE]

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

408

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

409

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan was prepared Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CTF. #12; ii #12; iii

410

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007 Investment Plan was prepared with contribution from the following Energy Commission staff and consultants Kondoleon, Chuck Najarian. 2007 Strategic Transmission Investment Plan. California Energy Commission

411

Application for a Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc.  

Broader source: Energy.gov [DOE]

Application from Champlain Hudson to construct, operate and maintain electric transmission facilities at the U.S. - canada Border.  Amendment to Presidential Permit Application Letter.

412

Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc.  

Broader source: Energy.gov [DOE]

Application from Champlain Hudson to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.  Identification of Preferred Alternative for Permit Amendment.

413

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Broader source: Energy.gov (indexed) [DOE]

International Transmission Company to late motions to intervene and comments of Baltimore Gas and Electric Company, American Electric Power, and Pepco Holdings, Inc. PP-230-4...

414

Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc.  

Broader source: Energy.gov [DOE]

Application from Champlain Hudson to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.  Addendum to Presidential Permit Letter.

415

Transmission Utilization Group (TUG)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Intertie Initiatives Intertie Open Season Transmission Utilization...

416

Transmission Commercial Project Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

417

Underground Power Transmission  

Science Journals Connector (OSTI)

...The type of transmission line for a particular...will force rt transmission lines to be ground near...history of power transmission shows that d-c...characteristics of a d-c line, it is easy to...Best data fit III II I...

P. H. Rose

1970-10-16T23:59:59.000Z

418

Vice President, Transmission Marketing & Sales  

Broader source: Energy.gov [DOE]

Within Transmission Services at Bonneville Power Administration (BPA), Transmission Marketing and Sales (TS) provides open access to the Federal Transmission System (FTS) consistent with...

419

The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425  

SciTech Connect (OSTI)

Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)

Feist, E.T. [Washington Closure Hanford, 2620 Fermi Avenue, Richland, WA 99354 (United States)

2012-07-01T23:59:59.000Z

420

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Did "Pookie" get a green-collar job? : a critical case study on the East Bay Green Corridor's employment goals, activities, and impacts  

E-Print Network [OSTI]

This thesis describes the formation of the East Bay Green Corridor (EBGC), a multi-city partnership for green investment in California, and how it failed to create stable, living wage economic opportunities for those with ...

Miller, Matthew J. (Matthew Jordan)

2014-01-01T23:59:59.000Z

422

ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED WITHDRAWAL OF PUBLIC LANDS WITHIN AND SURROUNDING THE CALIENTE RAIL CORRIDOR, NEVADA  

SciTech Connect (OSTI)

The purpose for agency action is to preclude surface entry and the location of new mining claims, subject to valid existing rights, within and surrounding the Caliente rail corridor as described in the Yucca Mountain FEIS (DOE 2002). This protective measure is needed to enhance the safe, efficient, and uninterrupted evaluation of land areas for potential rail alignments within the Caliente rail corridor. The evaluation will assist the DOE in determining, through the Rail Alignment environmental impact statement (EIS) process, whether to construct a branch rail line, and to provide support to the BLM in deciding whether or not to reserve a ROW for the rail line under the Federal Land Policy and Management Act (FLPMA). The BLM participated as a cooperating agency in preparing this EA because it is the responsible land manager and BLM staff could contribute resource specific expertise.

DOE

2005-12-01T23:59:59.000Z

423

(DOE/EIS-0285-SA-104): Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Lynch Creek Tap to LaGrande-Cowlitz No.1 8/21/02  

Broader source: Energy.gov (indexed) [DOE]

1, 1, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-104-Lynch Creek Tap to LaGrande-Cowlitz No. 1 James A. Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management for the Lynch Creek to LaGrande-Cowlitz No. 1 Location: Near the town of Eatonville, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 29 miles of access roads and corridor will be treated. Vegetation management is required

424

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

425

Planning and processing of new or upgraded electric transmission systems in New Mexico  

SciTech Connect (OSTI)

RETA has been requested to identify and prioritize renewable energy resource zones in New Mexico that have a potential to support industry development among renewable energy developers for renewable resource generation projects. Moreover, Senate Memorial 44 requests that RETA identify and prioritize the best viable options for potential transmission corridors to accommodate renewable energy export from New Mexico in accordance with a defined time-line and to convene a working group to submit recommendations to the legislature for establishing a process to streamline procedures for establishing renewable energy transmission projects in New Mexico. RETA's July 9, 2009 request for comments outlined seven topical areas of specific value to Senate Memorial 44. This document addresses Topics 1, 3 and 4.

Toole, Gasper Loren [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

426

Stream Control Transmission Protocol  

Science Journals Connector (OSTI)

This document describes the Stream Control Transmission Protocol (SCTP). SCTP is designed to transport PSTN signaling messages over IP networks, but is capable of broader applications.

R. Stewart; Q. Xie; K. Morneault; C. Sharp; H. Schwarzbauer; T. Taylor; I. Rytina; M. Kalla; L. Zhang; V. Paxson

2000-10-01T23:59:59.000Z

427

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

428

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

429

Multi-decadal degradation and persistence of permafrost in the Alaska Highway corridor, northwest Canada  

Science Journals Connector (OSTI)

Changes in permafrost distribution in the southern discontinuous zone were evaluated by repeating a 1964 survey through part of the Alaska Highway corridor (56° N–61° N) in northwest Canada. A total of 55 sites from the original survey in northern British Columbia and southern Yukon were located using archival maps and photographs. Probing for frozen ground, manual excavations, air and ground temperature monitoring, borehole drilling and geophysical techniques were used to gather information on present-day permafrost and climatic conditions. Mean annual air temperatures have increased by 1.5–2.0?° C since the mid-1970s and significant degradation of permafrost has occurred. Almost half of the permafrost sites along the entire transect which exhibited permafrost in 1964 do so no longer. This change is especially evident in the south where two-thirds of the formerly permafrost sites have thawed and the limit of permafrost appears to have shifted northward. The permafrost that persists is patchy, generally less than 15 m thick, has mean annual surface temperatures >0?° C, mean ground temperatures between ?0.5 and 0?° C, is in peat or beneath a thick organic mat, and appears to have a thicker active layer than in 1964. Its persistence may relate to the latent heat requirements of thawing permafrost or to the large thermal offset of organic soils. The study demonstrates that degradation of permafrost has occurred in the margins of its distribution in the last few decades, a trend that is expected to continue as the climate warms.

Megan James; Antoni G Lewkowicz; Sharon L Smith; Christina M Miceli

2013-01-01T23:59:59.000Z

430

Notice of Intent for the Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota (5/27/05)  

Broader source: Energy.gov (indexed) [DOE]

16 16 Federal Register / Vol. 70, No. 102 / Friday, May 27, 2005 / Notices Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Note that also there is an ''eSubscription'' link on the web site that enables subscribers to receive e- mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659. Comment Date: June 9, 2005. Magalie R. Salas, Secretary. [FR Doc. E5-2702 Filed 5-26-05; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Western Area Power Administration Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota

431

Transmission Line Security Monitor  

SciTech Connect (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

432

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

433

REQUEST BY ALLISON TRANSMISSION FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN RIGHTS IN SUBJECT INVENTIONS MADE IN THE  

Broader source: Energy.gov (indexed) [DOE]

ALLISON TRANSMISSION FOR AN ADVANCE WAIVER OF ALLISON TRANSMISSION FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN RIGHTS IN SUBJECT INVENTIONS MADE IN THE COURSE OF OR UNDER DEPARTMENT OF ENERGY COOPERATIVE AGREEMENT NO. DE-FC05-00OR22807; DOE WAIVER DOCKET W(A)-00-032 [ORO-758] Petitioner, Allison Transmission, has made a timely request for an advance waiver to worldwide rights in Subject Inventions made in the course of or under Department of Energy (DOE) Cooperative Agreement No. DE-FC05-00OR22807. Petitioner is a subcontractor to Electricore, the awardee of the above Cooperative Agreement. The scope of this work is to continue development of the E P System T M , alpha configuration in an articulated bus. This work is sponsored by the Office of Transportation Technologies, Office of Heavy Vehicle Technologies.

434

Strategy for the Integration of Hydrogen as a Vehicle Fuel into the Existing Natural Gas Vehicle Fueling Infrastructure of the Interstate Clean Transportation Corridor Project: 22 April 2004--31 August 2005  

SciTech Connect (OSTI)

Evaluates opportunities to integrate hydrogen into the fueling stations of the Interstate Clean Transportation Corridor--an existing network of LNG fueling stations in California and Nevada.

Gladstein, Neandross and Associates

2005-09-01T23:59:59.000Z

435

EIS(DOE/EIS-0285/SA-61) Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/15/02  

Broader source: Energy.gov (indexed) [DOE]

April 15, 2002 April 15, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-61 Tom Murphy - TFS/Bell-1 - Natural Resource Specialist Proposed Action: Vegetation Management along the Bell-Boundary No.3, 84/4 to 96/1 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 100 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Stevens and Pend Oreille County, WA, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-

436

DOE/EIS-0285-SA-137: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Chemawa-Salem 1&2 (4/1/03)  

Broader source: Energy.gov (indexed) [DOE]

7- Chemawa-Salem1&2) 7- Chemawa-Salem1&2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Chemawa-Salem #1 115 kV and #2 230 kV transmission lines from Chemawa Substation to Salem Substation. Location: The project is located in the BPA Eugene Region, Marion County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-

437

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2  

Broader source: Energy.gov (indexed) [DOE]

2- KeelerOregon City #2) 2- KeelerOregon City #2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Keeler-Oregon City #2 115 kV transmission line from Keeler Substation to Oregon City Substation. Includes 5 miles of the St. Johns- Oregon City #2 69 kV transmission line. Location: The project is located in the BPA Eugene Region, Washington County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation via hand cutting along the right-of-way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with

438

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

439

Transmission Access Resources  

Broader source: Energy.gov [DOE]

Historically, the addition of new electric generation facilities has been accompanied by new transmission systems. For example, large nuclear and coal plants built in the 1960s and 1970s required...

440

Performance Incentives for Transmission  

E-Print Network [OSTI]

The Federal Energy Regulatory Commission's Standard Market Design Notice of Public Rule- making (SMD NOPRPerformance Incentives for Transmission FERC's Standard Market Design should accommodate of California at Berkeley. The research described in this article was supported by National Grid, USA

Oren, Shmuel S.

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Designing electricity transmission auctions  

E-Print Network [OSTI]

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

442

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

443

Audio Transmission Systems  

Science Journals Connector (OSTI)

Audio transmission systems are the means by which audio signals are routed, processed, and assigned to the desired monitor and recording output channels. In the early days of electrical recording, rarely more ...

John Eargle

1986-01-01T23:59:59.000Z

444

Transmission Grid Integration  

Broader source: Energy.gov [DOE]

The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

445

Honda Transmission Technical Center  

High Performance Buildings Database

Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

446

Transmission Right Of Way  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

447

Open Access Transmission Tariff  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

448

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

Agencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary General Transmission...

449

National Electric Transmission Congestion Study Webinars | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

450

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

451

Electricity Transmission, A Primer | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

452

The Vapor Plume at Material Disposal Are C in Relation to Pajarito Corridor Facilities  

SciTech Connect (OSTI)

A vapor plume made up of volatile organic compounds is present beneath Material Disposal Area C (MDA C) at Los Alamos National Laboratory (LANL). The location and concentrations within the vapor plume are discussed in relation to existing and planned facilities and construction activities along Pajarito Road (the 'Pajarito Corridor') and in terms of worker health and safety. This document provides information that indicates that the vapor plume does not pose a threat to the health of LANL workers nor will it pose a threat to workers during construction of proposed facilities along Pajarito Road. The Los Alamos National Laboratory (LANL or the Laboratory) monitors emissions, effluents, and environmental media to meet environmental compliance requirements, determine actions to protect the environment, and monitor the long-term health of the local environment. LANL also studies and characterizes 'legacy' waste from past Laboratory operations to make informed decisions regarding eventual corrective actions and the disposition of that waste. Starting in 1969, these activities have been annually reported in the LANL Environmental Report (formerly Environmental Surveillance Report), and are detailed in publicly accessible technical reports meeting environmental compliance requirements. Included among the legacy sites being investigated are several formerly used material disposal areas (MDAs) set aside by the Laboratory for the general on-site disposal of waste from mission-related activities. One such area is MDA C located in Technical Area 50 (TA-50), which was used for waste disposal between 1948 and 1974. The location of TA-50 is depicted in Figure 1. The present paper uses a series of maps and cross sections to address the public concerns raised about the vapor plume at MDA C. As illustrated here, extensive sampling and data interpretation indicate that the vapor plume at MDA C does not pose a threat to the health of LANL workers nor will it pose a threat to workers during construction of the proposed facilities and utility trenches. The public cannot be directly exposed to the vapor plume beneath MDA C because Pajarito Road is closed to the public.

Masse, William B. [Los Alamos National Laboratory

2012-04-02T23:59:59.000Z

453

New Egypt with a New Hybrid Skin “A New Hybrid Architecture Vision for the Egyptians‘Development Corridor  

Science Journals Connector (OSTI)

After the 25th of January revolution, Egypt was looking for a national project combines the energies of its young generations and draws a new image for Egypt. The development corridor for Farouk el Baz which aims to provide numerous opportunities for the development of new communities, agriculture, industry, trade and tourism around a 2,000 km strip of the Western Desert, Became one of the current national projects. This development corridor includes the establishment of a superhighway to be built using the highest international standards, 1,200 km in length, from west of Alexandria to the southern border of Egypt, Twelve east-west branches, with the total length of approximately 800 km, to connect the highway to high-density population centers along the way, A railroad for fast transport parallel to the superhighway, A water pipeline from the Toshka Canal to supply freshwater, and An electricity line to supply energy during the early phases of development. So, what would be the architecture of the new Egypt? How to avoid the current mistakes and problems in the existing urban environment? The new hybrid architectural skin is one of the suggested proposals for the new Egypt, and it means designing an eco-friendly, energy efficient Buildings qualified for \\{LEEDs\\} and Energy Star ratings. It also means, using technology and natural materials to create a healthy living urban environment. The research will come out with different scenarios for the new Egypt hybrid architecture and its guidelines.

Samar M. Sheweka

2012-01-01T23:59:59.000Z

454

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

455

NREL: Energy Analysis: Transmission Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

456

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

457

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

458

FY-09 Summary Report to the Office of Petroleum Reserves on the Western Energy Corridor Initiative Activities and Accomplishments  

SciTech Connect (OSTI)

To meet its programmatic obligations under the Energy Policy Act of 2005, the Office of Naval Petroleum and Shale Oil Reserves (NPSOR) has initiated the Western Energy Corridor Initiative (WECI). The WECI will implement the Unconventional Strategic Fuels Task Force recommendations for accelerating and promoting the development of domestic unconventional fuels to help meet the nations’ energy needs. The mission of the WECI is to bolster America’s future fuel security by facilitating socially and environmentally responsible development of unconventional fuels resources in the Western Energy Corridor, using sound engineering principles and science-based methods to define and assess benefits, impacts, uncertainties, and mitigation options and to resolve impediments. The Task Force proposed a three-year program in its commercialization plan. The work described herein represents work performed by Idaho National Laboratory (INL) in support of the DOE’s WECI. This effort represents an interim phase of work, designed to initiate only select portions of the initiative, limited by available funding resources within NPOSR. Specifically, the work presented here addresses what was accomplished in FY-09 with the remaining carryover (~$420K) from NPOSR FY-08 funds. It was the intent of the NPOSR program to seek additional funding for full implementation of the full scope of work; however, the original tasks were reduced in scope, terminated, or eliminated (as noted below). An effort is ongoing to obtain funding to continue the tasks initiated under this project. This study will focus on the integrated development of multiple energy resources in a carbon-neutral and environmentally acceptable manner. Emphasis will be placed on analyses of the interrelationships of various energy-resource development plans and the infrastructure, employment, training, fiscal, and economic demands placed on the region as a result of various development scenarios. The interactions at build-out during the design, permitting, and construction of individual and multiple energy developments are not fully considered at the local, state, regional, or national levels. The net impacts to the Western Energy Corridor cannot be understood and the design optimized under the current approach. A regional development plan is needed to model cumulative impacts, determine the carrying capacity of the basin, and provide valuable technically based information to both skeptics and advocates. The INL scope of work for FY-09 involved six tasks: 1. Evaluation of the ASPEN Code as a dynamic systems model for application and use under the WECI and communications with Alberta Oil Sands Research Institutions as an “analog” resource development in the Western Energy Corridor 2. Application of the Aspen Plus computer model to several oil shale processes to consider energy balances and inputs and outputs (e.g. water consumption, CO2 production, etc.) 3. Development of a regulatory roadmap for oil shale developments 4. Defining of the physiographic extent of the natural resource reserves that comprise the Western Energy Corridor 5. A review of the Unconventional Fuels Task Force Report to Congress for ideas, concepts and recommendations that crosscutting plans 6. Program development with stakeholders, including industry, academics, state and federal agencies, and non government organizations. This task also includes project management, strategic development and reporting.

Thomas R. Wood

2010-01-01T23:59:59.000Z

459

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

460

Application for Presidential Permit OE Docket No. PP-400 TDI-New England- New England Clean Power Link Project  

Broader source: Energy.gov [DOE]

Application from TDI-NE to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from The Weeks Lancaster Trust  

Broader source: Energy.gov [DOE]

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S, - Canada Border.

462

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska State Legislature, Peggy Wilson  

Broader source: Energy.gov [DOE]

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada border.

463

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture  

Broader source: Energy.gov [DOE]

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada border.

464

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska  

Broader source: Energy.gov [DOE]

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S.- Canada Border.

465

Electric Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

466

10-Yr. Transmission Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

467

STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY EDMUND G. BROWN...  

Broader source: Energy.gov (indexed) [DOE]

process by designating transmission corridor zones (transmission corridors) on state and private lands available for future high-voltage electricity transmission Lamont Jackson...

468

DOE/EIS-0285-SA-50: Supplement Analysis for the Transmission Vegetation Management Program FEIS (3/15/02)  

Broader source: Energy.gov (indexed) [DOE]

2/27/01 1 2/27/01 1 United States Government Department of Energy Bonneville Power Administration DATE: March 15, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-50) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Grizzly-Summerlake (Structures 102/1-104/2) and Grizzly-Captain Jack (Structures 103/1-140/4) Transmission Line Corridors. Location: The project area lies east and northeast Klamath Falls, OR, and is located in Lake and Klamath Counties, Redmond Region. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the rights of

469

(DOE/EIS-0285/SA-52): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (03/22/02)  

Broader source: Energy.gov (indexed) [DOE]

22, 2002 22, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-52) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on the Ashe-Marion #2 (138/1-150/2), Buckley- Marion (12/1-24/2), McNary-Santiam (109/1-119/3), and John Day-Marion (49/4-50/5) Transmission Line Corridors. Location: The project area lies between Maupin and Pine Grove Oregon, and is in the Redmond Region. The project area begins at on the Ashe-Marion at structure 138/1 and terminates at Wapinitia Road, Pine Grove. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the

470

EPA Air Docket A-98-49, Item II-B1-31; July 2014 Verification and Validation of WIPP Data Packages  

E-Print Network [OSTI]

. A completed verification checklist for each SDG and a table (spreadsheet) of all the measurement resultsEPA Air Docket A-98-49, Item II-B1-31; July 2014 1 Verification and Validation of WIPP Data...................................................................... 2 2.0 Verification Summary....................................................... 2 3.0 Validation

471

Transmission SEAB Presentation  

Broader source: Energy.gov (indexed) [DOE]

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

472

Continuously variable transmission  

SciTech Connect (OSTI)

This patent describes a power transmission apparatus. It comprises: a body, a pinion gear, a cam means, first and second gear rack pairs, preventing means;l first and second rack support means, a rotor mounted for rotation about a rotor axis, the rotor having rotor engaging means for engaging the rack support means so as to transmit power therebetween.

Irvin, P.J.E.

1992-07-14T23:59:59.000Z

473

Autonomous data transmission apparatus  

DOE Patents [OSTI]

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

474

Borehole data transmission apparatus  

DOE Patents [OSTI]

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

475

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 129) Ashe-Marion #2 [Mile 150-157]  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 129 Ashe-Marion #2 [Mile 150-157] Elizabeth Johnson Natural Resource Specialist- TFR/The Dalles Proposed Action: Vegetation Management for the Ashe-Marion #2 500 kV transmission line from structure 150/2 through structure 157/7 (reference line). The Buckley-Marion #1 transmission line is also present within the proposed corridor. Right of way width averages 135 feet. Location: The project location is within Wasco County, Oregon near the city of Pine Grove, and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

476

(DOE/EIS-0285/SA-113-1): Supplement Analysis for the Transmission System Vegetation Management Program Updates 9/27/02 SA-113 12/2/02  

Broader source: Energy.gov (indexed) [DOE]

12/02/02 12/02/02 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program (DOE/EIS-0285/SA-113-1) Updates 9/27/02 SA-113 Bill Erickson, TFP/Walla Walla Natural Resource Specialist Proposed Action: To perform remedial vegetation management for keeping vegetation a safe distance away from electric power facilities and controlling noxious weeds within a section of BPA's Big Eddy-Ostrander Transmission Corridor. During a site review conducted in late fall of 2001, the inspector observed various species of hardwood trees resprouted from stumps. The new vegetative growth encroached on the required "Minimum Safe Distance" between the top of vegetation and the conductor cables. The management action is necessary to reduce the current and potential future hazards that tall- growing vegetation poses to transmission

477

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-149-Captain Jack-Malin #1)  

Broader source: Energy.gov (indexed) [DOE]

8, 2003 8, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-149-Captain Jack-Malin #1) Elizabeth Johnson Natural Resource Specialist - TFR/The Dalles Proposed Action: Vegetation Management for the Captain Jack-Malin #1 500 kV transmission line from structure 2/4 to Malin Substation (reference line). Right of way width averages 150 feet. Location: The project location is within Klamath County, Oregon near the city of Malin, and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors.

478

DOE/EIS-0285-SA-136: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Oregon City-Chemawal 1&2 (4/1/03)  

Broader source: Energy.gov (indexed) [DOE]

6- Oregon City-Chemawa1&2) 6- Oregon City-Chemawa1&2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Oregon City-Chemawa #1 and #2 115 kV transmission lines from Oregon City Substation to Chemawa Substation. Location: The project is located in the BPA Eugene Region, Washington and Marion Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that

479

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

480

The design, construction, and operation of long-distance high-voltage electricity transmission technologies.  

SciTech Connect (OSTI)

This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these conductors at a safe distance from each other and from the ground and the natural and built environment. Common elements that are generally less visible (or at least more easily overlooked) include the maintained ROW along the path of the towers, access roads needed for maintenance, and staging areas used for initial construction that may be restored after construction is complete. Also visible but less common elements along the corridor may include switching stations or substations, where lines of similar or different voltages meet to transfer power.

Molburg, J. C.; Kavicky, J. A.; Picel, K. C.

2008-03-03T23:59:59.000Z

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Transmission Developers Inc.  

Broader source: Energy.gov (indexed) [DOE]

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

482

Transmission Siting_071508.indd  

Broader source: Energy.gov (indexed) [DOE]

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

483

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

484

Patterns of Transmission Investment  

E-Print Network [OSTI]

long term performance contracts with a developer of an HVDC transmission link to expand “interconnection” capacity between TSOs with no or limited interconnections and with large sustained differences in prices. Merchant investments supported... truly separate AC networks. For example, by building HVDC inter-connectors between two separate networks, opportunities to increase trades of power from high price to low priced areas can be exploited. The HVDC link between the England and France...

Joskow, Paul

2006-03-14T23:59:59.000Z

485

Boardman to Hemingway Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

486

Transmission Line Circuit Alexander Glasser  

E-Print Network [OSTI]

Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

Anlage, Steven

487

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

488

Transmission/Photo Gallery | Open Energy Information  

Open Energy Info (EERE)

Colorado transmission 2.jpg Bird diverters.jpg Transmission insulators.jpg Retrieved from "http:en.openei.orgwindex.php?titleTransmissionPhotoGallery&oldid687595...

489

NREL: Transmission Grid Integration - Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

490

Electric Transmission Line Siting Compact  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

491

Transmission Workshop | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

492

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network [OSTI]

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

493

Sent: Thu Aug 12 21:00:36 2010 Subject: RIN: 1904-AC13 Docket: EE-RM/STD-02-112  

Broader source: Energy.gov (indexed) [DOE]

Sent: Thu Aug 12 21:00:36 2010 Sent: Thu Aug 12 21:00:36 2010 Subject: RIN: 1904-AC13 Docket: EE-RM/STD-02-112 Mr. Nasseri, Please find the comments of the Natural Resources Defense Council on Energy Efficiency and Sustainable Design Standards for New Federal Buildings attached for the docket. We are also resubmitting the comments we wrote for the Interim Final Rule on the Energy Efficiency Standard for Federal Buildings, which were submitted on January 30, 2007, as Annex A to our new comments. Thank you for the opportunity to comment, Christine Chang Christine Chang | Legal Fellow | Natural Resources Defense Council Phone: 212.727.4431 Fax: 212.727.1773 | 40 West 20th Street, New York, NY 10011

494

Abstract --Under a context of transmission open access, a methodology to define a common transmission trunk system  

E-Print Network [OSTI]

Terms--Transmission systems, Transmission pricing, Cooperative games, Shapley value, Transmission open

Catholic University of Chile (Universidad Católica de Chile)

495

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA - 128 - Olympia-Satsop #3 [Mile1-6]  

Broader source: Energy.gov (indexed) [DOE]

6, 2003 6, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 128 - Olympia-Satsop #3 [Mile 1-6] James Jellison Natural Resource Specialist - TFO/Olympia Proposed Action: Vegetation Management for the Olympia-Satsop #3 230 kV transmission line corridor (reference line) from structure 1/1 through structure 6/1 and between structures 8/3 and 8/4. Other lines which are present in the proposed corridor are the Paul-Satsop #1 500 kV, Olympia-Satsop #2 500 kV, Olympia-South Elma #1 115 kV, Olympia-Kitsap #3 230 kV, Olympia-Shelton #3 230 kV, Olympia-Shelton #4 230 kV, and Olympia-Shelton #1 115 kV. Right of way width averages 615 feet. Location: The project location is within Thurston County, Washington and is within the

496

EIS-0250-S2: Supplemental EIS for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada- Nevada Rail Transportation Corridor  

Broader source: Energy.gov [DOE]

This SEIS is to evaluate the potential environmental impacts of constructing and operating a railroad for shipments of spent nuclear fuel and high-level radioactive waste from an existing rail line in Nevada to a geologic repository at Yucca Mountain. The purpose of the evaluation is to assist the Department in deciding whether to construct and operate a railroad in Nevada, and if so, in which corridor and along which specific alignment within the selected corridor.

497

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Equipment Transmission Lines 765 kV (no description) 500Montana-Alberta Tie 230 kV Transmission Line: TransmissionMontana-Alberta Tie 230 kV Transmission Line: Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

498

National Electric Transmission Congestion Study: Preliminary...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study: Preliminary Findings National Electric Transmission Congestion Study: Preliminary Findings The Department hosted three webinars in...

499

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery...

500

Environmental Impact Statements; Notice of Availability; FutureGen Final EIS; Draft PEIS for Designation of Energy Corridors in Eleven Western States (11/16/07)  

Broader source: Energy.gov (indexed) [DOE]

618 Federal Register 618 Federal Register / Vol. 72, No. 221 / Friday, November 16, 2007 / Notices Corridor Improvement Project, Proposed Roadway Improvements on Route 101 between the Eureka Slough Bridge and 11th St. Overcrossing in Arcata, Humbolt County, CA. Summary: EPA expressed environmental concerns about impacts to air quality and noise. EPA encourages continued interagency coordination to mitigate impacts to wetlands and cumulative impacts. Rating EC2. EIS No. 20070323, ERP No. D-FHW- J40177-CO, US-36 Corridor, Multi- Modal Transportation Improvements between I-25 in Adams County and Foothills Parkway/Table Mesa Drive in Boulder, Adams, Denver, Broomfield, Boulder and Jefferson Counties, CO. Summary: EPA expressed environmental concerns about the wetlands impacts and impacts to the