1

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest...

2

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations March 6, 2008 - 11:54am Addthis...

3

DOE National Interest Electric Transmission Corridors Conference  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Interest Electric Transmission Corridors Conference March 29, 2006 Hilton Garden Hotel Chicago, IL William H. Whitehead General Manager, Transmission Strategy PJM...

4

Multiple Use of Existing Transmission Corridors  

Science Conference Proceedings (OSTI)

Multiple use utility corridors can provide significant benefits for the utilities and the public. However, increasing the power flow in the power system can raise compatibility issues with other utilities or systems that share the corridor. This report provides case studies of three common corridors for which compatibility issues were raised as a result of planned increases in power transmission capacity. The case studies review the criteria used to evaluate compatibility and the need for mitigation meas...

2007-12-18T23:59:59.000Z

5

DOE Affirms National Interest Electric Transmission Corridor Designations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations. The U.S. Department of Energy (DOE) today denied requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as areas of significant electricity congestion and constraint. The designation of national corridors was made in accordance with the Energy Policy Act of 2005 (EPAct). DOE Affirms National Interest Electric Transmission Corridor Designations More Documents & Publications DOE Designates Southwest Area and Mid-Atlantic Area National Interest

6

Landscape Fragmentation and Electric Transmission Corridor Siting and Management  

Science Conference Proceedings (OSTI)

This report discusses landscape fragmentation and electric transmission corridor siting and management.

2003-12-04T23:59:59.000Z

7

DOE Issues Two Draft National Interest Electric Transmission Corridor Designations  

Energy.gov (U.S. Department of Energy (DOE))

WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the issuance of two draft National Interest Electric Transmission Corridor (National Corridor)...

8

Order Denying Rehearing: Docket No. 2007-OE-01, Mid-Atlantic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rehearing: Docket No. 2007-OE-01, Mid-Atlantic Area National Interest Electric Transmission Corridor; Docket No. 2007-0E-02, Southwest Area National Interest Electric...

9

DOE Affirms National Interest Electric Transmission Corridor Designations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations March 6, 2008 - 11:54am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today denied requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as areas of significant electricity congestion and constraint. The designation of national corridors was made in accordance with the Energy Policy Act of 2005 (EPAct). In affirming the National Corridor designations today, DOE dismissed as being without merit challenges raised by the applicants for rehearing, citing extensive data analysis conducted in its 2006 National Interest Electric Transmission

10

DOE Issues Two Draft National Interest Electric Transmission Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issues Two Draft National Interest Electric Transmission Issues Two Draft National Interest Electric Transmission Corridor Designations DOE Issues Two Draft National Interest Electric Transmission Corridor Designations April 26, 2007 - 10:58am Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the issuance of two draft National Interest Electric Transmission Corridor (National Corridor) designations. The Energy Policy Act of 2005 authorizes the Secretary, based on the findings of DOE's National Electric Transmission Congestion Study (Congestion Study), to designate National Corridors. "These draft designations set us on the path to modernize our constrained and congested electric power infrastructure. They are a crucial step toward realizing President Bush's goal of a modern, more efficient electric

11

Order Denying Rehearing: Docket No. 2007-OE-01, Mid-Atlantic Area National  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Order Denying Rehearing: Docket No. 2007-OE-01, Mid-Atlantic Area Order Denying Rehearing: Docket No. 2007-OE-01, Mid-Atlantic Area National Interest Electric Transmission Corridor; Docket No. 2007-0E-02, Southwest Area National Interest Electric Transmission Corridor Order Denying Rehearing: Docket No. 2007-OE-01, Mid-Atlantic Area National Interest Electric Transmission Corridor; Docket No. 2007-0E-02, Southwest Area National Interest Electric Transmission Corridor For the reasons set forth herein, it is hereby ordered that: A. In Docket No. 2007-OE-01, the applications for rehearing and stay are denied. Any party to thisproceeding that submitted a timely application for rehearing and is aggrieved by the Report and Order and this Order may seek judicial review in a United States Circuit Court of Appeals pursuant to

12

Hybrid Transmission Corridor Study: Volume 1: Phase 1--Scale Model Development  

Science Conference Proceedings (OSTI)

Installation of HVDC transmission lines on existing rights- of-way with HVAC lines can increase power transfer for a given right-of-way width. This phase of the hybrid transmission corridor study developed a model for predicting the electrical effects between HVAC and HVDC lines in a hybrid corridor. The work underscores the importance of maintaining a critical separation between the two lines.

1992-07-14T23:59:59.000Z

13

Wetland and Conservation Banking in Transmission Corridor Rights-of-Way: Feasibility Assessment  

Science Conference Proceedings (OSTI)

Electric power transmission corridor rights-of-way (ROWs) offer potential locations for wetland mitigation banks and conservation banks. Barriers to use of these ROWs for banking include whether the ROW operator has legal rights of access to lands for these uses and for long term management for conservation; the need to assure successful and reliable operation and maintenance of the ROW transmission facilities; the costs of establishing, permitting and managing wetland and conservation banks; and ecologi...

2008-12-10T23:59:59.000Z

14

Transmission Siting Integrating National Corridor and North American Electric Reliability Corporation (NERC) Compliance Requirements  

Science Conference Proceedings (OSTI)

In national interest electric transmission corridors, the siting process for transmission and distribution rights-of-way follows Federal Energy Regulatory Commission (FERC) guidelines. As described in the FERC Permit Process, eminent domain proceedings are not the preferred method of obtaining rights-of-way. The permitting process is rather one of engaging the public through meetings and education to develop siting consensus. This approach requires an in-depth understanding of the primary technical issue...

2010-12-22T23:59:59.000Z

15

DEPARTMENT OF ENERGY National Electric Transmission Congestion Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Report National Electric Transmission Congestion Report [Docket No. 2007-OE-01, Mid-Atlantic Area National Interest Electric Transmission Corridor; Docket No. 2007-0E-02, Southwest Area National Interest Electric Transmission Corridor] AGENCY: Department of Energy. ACTION: Order Denying Rehearing. SUMMARY: On October 5,2007, the Department of Energy (Department or DOE) published in the Federal Register a National Electric Transmission Congestion Report and Order (Report and Order) in the above dockets in which it designated the Mid- Atlantic Area and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) (72 FR 56992). Numerous parties in each of the above named dockets filed timely applications for rehearing of DOE's Report and Order. Some parties

16

Public Technical Conference on DOE Congestion Study and Criteria for Designation of National Interest Electric Transmission Corridors  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Conference Technical Conference DOE Congestion Study and Criteria Designation of National Interest Electric Transmission Corridors March 29, 2006 Comments of Edward D. Tatum, Jr. Old Dominion Electric Cooperative Constraint Area and Corridor Designation * Corridors need to be "just right" * Too broad a designation could frustrate Congress' intent to facilitate licensing * Identify specific facilities rather than a family of alternatives - Too many; too long - Recognize impact on existing facilities Constraint Area and Corridor Designation * Existing infrastructure points with generalized paths between * Need "off ramps" * Opportunity to upgrade existing facilities or utilize existing ROW * Need to deliver into congested area * Provide States necessary opportunity for final

17

Nest predation, predator abundance, and avian diversity in transmission line corridors and adjacent habitats in east central Texas.  

E-Print Network (OSTI)

??Transmission line corridors and other types of rights-of-way (ROW) are narrower and more continuous than other types of disturbances and, therefore, result in a proportionately… (more)

Hubbard, Tani Ann

2012-01-01T23:59:59.000Z

18

Southwest Area Corridor Map | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Map DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors October 2, 2007 Proposed Energy Transport Corridors: West-wide energy...

19

DOE/EIS-0285-SA-139: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Little Goose-Lower Granite Corridor Maintenance (4/3/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9-Little Goose-Lower Granite Corridor Maintenance 9-Little Goose-Lower Granite Corridor Maintenance William Erickson Natural Resource Specialist - TFP/Walla Walla Proposed Action: Vegetation Management for the Little Goose-Lower Granite #1 and #2 Transmission Line Corridor from Towers 4/3 to 8/1. The right-of-way has an easement width of 258 feet and contains two 500kV Single Circuit Transmission Lines. The proposed work will be accomplished in the indicated sections of the transmission line corridor as referenced in the attached checklist. Location: The subject right-of-way is located in Columbia County, WA., being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: The work will be accomplished by an Integrated Vegetation Management approach using a combination of manual, mechanical, herbicides and biological

20

Fiber Optic Cables in Overhead Transmission Corridors: A State-of-the-Art Review  

Science Conference Proceedings (OSTI)

Many electric utilities are installing high capacity fiber optic cables and wires on their high voltage lines to satisfy their own internal communication needs and to gain additional revenues by leasing excess capacity to telecommunication network providers. This report presents a review and evaluation of the state-of-the-art in using fiber optic technology in high voltage corridors.

1997-11-26T23:59:59.000Z

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

22

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Elisha Gray  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

23

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Robert Martin  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

24

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Michael Marino  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

25

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Larry Rappaport  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

26

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Linda Upham  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

27

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners  

Energy.gov (U.S. Department of Energy (DOE))

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada border.

28

Proposed Energy Transport Corridors: West-wide energy corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Programmatic Environmental Impact Statement FACT SHEET: Designation of National Interest Electric Transmission Corridors,As Authorized by the Energy Policy Act of 2005...

29

A survey of endangered waterbirds on Maui and Oahu and assessment of potential impacts to waterbirds from the proposed Hawaii Geothermal Project transmission corridor. Final report  

DOE Green Energy (OSTI)

A survey of endangered waterbirds on Maui and Oahu was conducted during August and September 1993 to identify potential waterbird habitats within the general area of the proposed Hawaii Geothermal Project transmission corridor and to assess the potential impacts to endangered waterbird of installing and operating a high voltage transmission line from the Island of Hawaii to the islands of Oahu and Maui. Annual waterbird survey information and other literature containing information on specific wetland sites were summarized. Literature describing impacts of overhead transmission lines on birds was used to evaluate potential impacts of the proposed project on endangered waterbirds, resident wading birds, and migratory shorebirds and waterfowl. On Oahu, five wetland habitats supporting endangered Hawaiian waterbirds were identified within 2.5 miles of the proposed transmission line corridor. On Maui, three wetland habitats supporting endangered Hawaiian waterbirds were identified within the general area of the proposed transmission line corridor. Several of the wetlands identified on Oahu and Maui also supported resident wading birds and migratory shorebirds and waterfowl. Endangered waterbirds, resident wading birds, and migratory birds may collide with the proposed transmission lines wires. The frequency and numbers of bird collisions is expected to be greater on Oahu than on Maui because more wetland habitat exists and greater numbers of birds occur in the project area on Oahu. In addition, the endangered Hawaiian goose and the endangered Hawaiian petrel may be impacted by the proposed segment of the Hawaii Geothermal Project transmission line on Maui.

Evans, K.; Woodside, D.; Bruegmann, M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

1994-08-01T23:59:59.000Z

30

Hybrid Transmission Corridor Study: Volume 2: Phase 2--Full-Scale Tests  

Science Conference Proceedings (OSTI)

Adding an HVDC transmission line to an existing right-of-way with an HVAC line can increase power transfer for a given right-of-way width. However, interaction between the two line types can change some electrical effects unless a critical distance is exceeded.

1992-07-14T23:59:59.000Z

31

Southwest Area Corridor Map | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Map DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors October 2, 2007 FACT SHEET: Designation of National Interest Electric...

32

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Lee Ann Moulder  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

33

Application for Presidential permit OE Docket No. PP-230-4 Internation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Independent Electricity System Operator Application for Presidential permit OE Docket...

34

Application for Presidential Permit OE Docket No. PP-022-4 British...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application to Amend Presidential Permit OE Docket No. PP-022-4...

35

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OE Docket No. PP-230-4 International Transmission Company: Comments of The Detriot Edison Company Application for presidential permit OE Docket No. PP-230-4 International...

36

Hawaii Geothermal Project annotated bibliography: Biological resources of the geothermal subzones, the transmission corridors and the Puna District, Island of Hawaii  

DOE Green Energy (OSTI)

Task 1 of the Hawaii Geothermal Project Interagency Agreement between the Fish and Wildlife Service and the Department of Energy-Oak Ridge National Laboratory (DOE) includes an annotated bibliography of published and unpublished documents that cover biological issues related to the lowland rain forest in Puna, adjacent areas, transmission corridors, and in the proposed Hawaii Geothermal Project (HGP). The 51 documents reviewed in this report cover the main body of biological information for these projects. The full table of contents and bibliography for each document is included along with two copies (as requested in the Interagency Agreement) of the biological sections of each document. The documents are reviewed in five main categories: (1) geothermal subzones (29 documents); (2) transmission cable routes (8 documents); (3) commercial satellite launching facility (Spaceport; 1 document); (4) manganese nodule processing facility (2 documents); (5) water resource development (1 document); and (6) ecosystem stability and introduced species (11 documents).

Miller, S.E.; Burgett, J.M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

1993-10-01T23:59:59.000Z

37

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pamela Martin Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin Application from Northern Pass Transmission to...

38

Application for Presidential Permit OE Docket No. PP-371 Northern...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Robert Martin Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Robert Martin Application from Northern Pass Transmission to...

39

Application for Presidential Permit OE Docket No. PP-369 British...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

69 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission...

40

Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator  

Energy.gov (U.S. Department of Energy (DOE))

Supplemental comments of the Midwest Independent Transmission System Operaton on the application from International Transmission Company to construct, operate, and maintain electric transmission...

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Application for presidential permit OE Docket No. PP-334 Baja...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC: Federal Register Notice Volume 73, No. 36 - Feb. 22, 2008 Application for presidential permit OE Docket No....

42

Application for Presidential Permit OE Docket No. PP-334 Energia Juarez U.S. Transmission, LLC,: Record of Decision  

Energy.gov (U.S. Department of Energy (DOE))

DOE announces its decision to issue a Presidential Permit to Energia Sierra Juarez U.S, Transmission, LLC (ESJ) to construct, operate and maintain electric transmission facilities at the U.S. -...

43

Application to Amend Presidential Permit OE Docket No. PP-022...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& Publications PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-022-4...

44

Application for presidential permit OE Docket No. PP-299 Sea...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System Inc More Documents & Publications SEA-04: DOE Notice of Availability...

45

Amended Application for Presidential Permit OE Docket No: PP...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LLC: Federal Register Notice, Volume 78, No. 160 - August 19, 2013 Amended Application for Presidential Permit OE Docket No: PP-371 Northern Pass Transmission LLC: Federal Register...

46

Application for presidential permit OE Docket No. PP-334 Energia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application for presidential permit OE Docket No. PP-334 Energia Sierra Juarex U.S Transmission LLC: Notice of Intent To Prepare an Environmental Impact Statement....

47

Application for presidential permit OE Docket No. PP-334 Energia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2009 Application for presidential permit OE Docket No. PP-334 Energia Sierra Juarex U.S Transmission LLC - Notice of Intent To Prepare an Environmental Impact Statement:...

48

Application for presidential permit OE Docket No. PP-371 Northern...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LLC: Federal Register Notice Volume 75, No. 220 - Nov. 16, 2010 Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Federal Register Notice...

49

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydro, LLC Application for Presidential Permit OE Docket No. PP-387 Soule Hydro, LLC Application from Soule Hydro to construct, operate and maintain electric transmission...

50

MidAtlantic_Corridor_Map091707.pdf | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors October 2, 2007 FACT SHEET: Designation of National Interest Electric...

51

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Midwest Independent Midwest Independent Transmission System Operator Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Midwest Independent Transmission System Operator Comments of the Midwest Independent Transmission System Operaton on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for presidential permit OE Docket No. 230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator Application for presidential permit OE Docket No. PP-230-4 International

52

DOE Issues Two Draft National Interest Electric Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Two Draft National Interest Electric Transmission Corridor Designations DOE Issues Two Draft National Interest Electric Transmission Corridor Designations U.S....

53

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reply Comments Reply Comments Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Reply Comments Reply Comments of International Transmission Company in reference to application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Independent Electricity System Operator Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners Application for Presidential Permit OE Docket No. PP-230-4 International

54

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company Application for presidential permit OE Docket No. PP-230-4 International Transmission...

55

Application for presidential permit OE Docket No. PP-334 Baja...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

34 Baja Wind U.S Transmission LLC: Update Application for presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC: Update Application from Baja Wind U.S...

56

Application for Presidential permit OE Docket No. PP-230-4 Internation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Independent Electricity System Operator Application for Presidential permit OE Docket No. PP-230-4...

57

Application for Presidential Permit OE Docket No: PP-371 Northern Pass  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No: PP-371 Northern No: PP-371 Northern Pass Transmission: Comments from William and Michelle Shoemaker Application for Presidential Permit OE Docket No: PP-371 Northern Pass Transmission: Comments from William and Michelle Shoemaker Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. Shoemaker_Comments.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Linda Upham Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Fred Brownson

58

Proposed Energy Transport Corridors: West-wide energy corridor programmatic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Transport Corridors: West-wide energy corridor Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Map of the area covered by a programmatic environmental impact statement (PEIS), "Designation of Energy Corridors on Federal Land in the 11 Western States" (DOE/EIS-0386) to address the environmental impacts from the proposed action and the range of reasonable alternatives. The proposed action calls for designating more than 6,000 miles of energy transport corridors across the West. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. More Documents & Publications

59

Energy Corridors on Federal Lands | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Corridors on Federal Lands Energy Corridors on Federal Lands Energy Corridors on Federal Lands In many areas of the United States, the infrastructure required to deliver energy has not always kept pace with growth in demand. To improve energy delivery and enhance the electric transmission grid for the future, several government agencies currently are working together to establish a coordinated network of Federal energy corridors on Federal lands throughout the United States. Energy corridors would help address growing energy demand by facilitating future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities, while also protecting the environment. As the agency-preferred siting locations, the energy transport corridors will provide industry and the public with

60

Application for presidential permit OE Docket No. PP-371 Northern Pass  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Addendum to Application Addendum to Application Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Addendum to Application On October 14, 2010, Northern Pass Transmission, LLC submitted an application for a Presidential Permit to construct a 1,200 MW high voltage direct current ("HVDC") transmission line (the "Application") from the Des Cantons substation in Quebec, to Franklin, New Hampshire (the "Project"). Northern Pass Transmission, LLC Docket No. PP-371 Addendum to Application More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Lee Ann Moulder Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Linda Upham

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: PJM Letter filed Dec 8, 2011 in support of Settlement Agreement  

Energy.gov (U.S. Department of Energy (DOE))

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S - Canada border.

62

Application for presidential permit OE Docket No. PP-334 Baja Wind U.S  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

presidential permit OE Docket No. PP-334 Baja Wind presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC: Federal Register Notice Volume 73, No. 36 - Feb. 22, 2008 Application for presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC: Federal Register Notice Volume 73, No. 36 - Feb. 22, 2008 Federal Register Notice in Vol 73 No 36 of Application from Baja Wind U.S Transmission LLC to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border. Application for presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC More Documents & Publications Application for Presidential Permit OE Docket No. PP-334 Baja Wind Transmission, LLC Application for presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC: Update

63

Application for Presidential Permit OE Docket No. PP-022-4 British Columbia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Presidential Permit OE Docket No. PP-022-4 British for Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation Application for Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation Application from British Columbia Transmission Corporation to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation More Documents & Publications Application to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78 - Apr. 24, 2007 Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority

64

Application for Presidential Permit OE Docket No. PP-230-3 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presidential Permit OE Docket No. PP-230-3 Presidential Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission Application for Presidential Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission Application from International Transmission Company d/b/a ITCTransmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission More Documents & Publications Application for Presidential Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission Application for presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC Holdings Corporation Limited Partnership, International Transmission

65

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Comments of the Independent Electricity System Operator Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental...

66

Application for presidential permit OE Docket No. PP-230-4 Internation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from PJM Interconnection LLC Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from PJM...

67

Application for Presidential Permit OE Docket No. PP-230-4 Internation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: PJM Letter filed Dec 8, 2011 in support of Settlement Agreement Application for...

68

Application for Presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

permit OE Docket No. PP-230-4 permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Independent Electricity System Operator Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Independent Electricity System Operator Comments of the Independent Electricity System Operator on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for persidential permit OE Docket No. PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-362 Champlain Hudson Power Express Inc Application for presidential permit OE Docket No. PP-230-4 International

69

Application for Presidential Permit OE Docket No. PP-230-3 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Permit OE Docket No. PP-230-3 Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission Application for Presidential Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission Application for Presidential Permit authorizing International Transmission Company to construct, operate, and maintain electric transmission facilities at teh U.S. - Canada Border. PP-230-3 International Transmission Company More Documents & Publications Application for Presidential Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission Application for presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC Holdings Corporation Limited Partnership, International Transmission Company, and DTE Energy Company PP-230-3 International Transmission Company

70

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

presidential permit OE Docket No. PP-230-4 presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of The Detriot Edison Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of The Detriot Edison Company The Detriot Edison Company hereby submits these comments and a motion in the alternative for leave to intervene out of time in response to the January 5, 2009 filing by international transmission company. Docket No. PP-230-04 Comments and Motion in the Alternative for Leave to Intervene Out of Time of The Detriot Edison Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene and Comments Application for presidential permit OE Docket No. PP-230-4 International

71

Application for Presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presidential permit OE Docket No. PP-230-4 Presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of New York Transmission Owners to ITC Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of New York Transmission Owners to ITC Response of New York Transmission Owners to answer of ITC in regard to the application for a Presidential Peermit authorizing International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene of New York Transmission Owners

72

Application for Presidential Permit OE Docket No. PP-369 British Columbia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

69 British 69 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application from British Columbia Transmission Corporation and British Columbia Hydro and Power Authority to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority More Documents & Publications PP-369 British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation

73

Application to Amend Presidential Permit OE Docket No. PP-022-4 British  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Amend Presidential Permit OE Docket No. PP-022-4 to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78 - Apr. 24, 2007 Application to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78 - Apr. 24, 2007 Application from British Columbia Transmission Corporation to amend Presidential Permit to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border: Federal Register Notice Application to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice, Volume 72, No. 78 More Documents & Publications Application for Presidential Permit OE Docket No. PP-022-4 British Columbia

74

Application for presidential permit OE Docket No. PP-371 Northern Pass  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LLC: Federal Register Notice Volume 75, No. 220 - Nov. LLC: Federal Register Notice Volume 75, No. 220 - Nov. 16, 2010 Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Federal Register Notice Volume 75, No. 220 - Nov. 16, 2010 Application from Northern Pass Transmission LLC to construct, operate, and maintain electric transmission facilities at the U.S-Canada border.. Federal Register Notice Vol 75 No 220. Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC More Documents & Publications Application for presidential permit OE Docket No. PP-362 Champlain Hudson: Federal Register Notice Volume 75, No. 43 - Mar. 5, 2010 Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Addendum to Application Application for Presidential Permit OE Docket No. PP-371 Northern Pass

75

FE-Docket No. 99-1: Petition to intervene of Calpine Power Services Company  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FE-Docket No. 99-1: Petition to intervene of Calpine Power Services FE-Docket No. 99-1: Petition to intervene of Calpine Power Services Company FE-Docket No. 99-1: Petition to intervene of Calpine Power Services Company Proposed open access requirement for international electric transmission facilities and delegation to the federal energy regulatory commission. Enclosed for filing are an original and fifteen copies of the petition to intervene of power service company in the above-captioned proceeding. FE-Docket No. 99-1: Petition to intervene of Calpine Power Services Company More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Campton Conservation Commission Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Petition to Intervene Out of Time and Comments of

76

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Out of Time Petition to Intervene and Out of Time Petition to Intervene and Comments of Baltimore Gas and Electric Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Out of Time Petition to Intervene and Comments of Baltimore Gas and Electric Company International Transmission Company, Docket No. PP-230-4 Out of Time Petition to Intervene and Comments of Baltimore Gas and Electric Company International Transmission Company, Docket No. PP-230-4 Out of Time Petition to Intervene and Comments of Baltimore Gas and Electric Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene and Comments Application for presidential permit OE Docket No. PP-230-4 International

77

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

American Municipal Power, American Municipal Power, Inc. and Old Dominion Electric Cooperative Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to American Municipal Power, Inc. and Old Dominion Electric Cooperative Answer of International Transmission Company to Late Petition to Intervene and for Additional Relief of American Municipal Power, Inc. and Old Dominion Electric Cooperative. on application for Presidential Permit OE Docket No. 230-4. PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Petition to Intervene and Request for Opportunity to Comment, American Municipal Power and Old Dominion Electric

78

Application to Amend Presidential Permit OE Docket No. PP-022-4 British  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amend Presidential Permit OE Docket No. PP-022-4 Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78 - Apr. 24, 2007 Application to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78 - Apr. 24, 2007 Application from British Columbia Transmission Corporation to amend Presidential Permit to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border: Federal Register Notice Application to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice, Volume 72, No. 78 More Documents & Publications EXC-13-0004 - In the Matter of Liebherr Canada Ltd. PP-369 British Columbia Transmission Corporation and British Columbia Hydro

79

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Comments of the Supplemental Comments of the Independent Electricity System Operator Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Independent Electricity System Operator Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PP-230-4 Independent Electricity System Operator More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Reply Comments Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator Application for Presidential Permit OE Docket No. PP-230-4 International

80

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Late Motion to Intervene of Late Motion to Intervene of New York Transmission Owners Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene of New York Transmission Owners Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. Response to Late Motion to Intervene of New York Transmission Owners PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from FirstEnergy Service Corporation Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from PJM

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Comments and Comments Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene and Comments Answer of International Transmission Company to late motions to intervene and comments of Baltimore Gas and Electric Company, American Electric Power, and Pepco Holdings, Inc. PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Out of Time Petition to Intervene and Comments of Baltimore Gas and Electric Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from FirstEnergy Service Corporation Application for presidential permit OE Docket No. PP-230-4 International

82

Application for Presidential Permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presidential Permit OE Docket No. PP-230-4 Presidential Permit OE Docket No. PP-230-4 International Transmission Co: Answer to NYISO from MISO and IESO Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Co: Answer to NYISO from MISO and IESO The Midwest Independent Transmission System Operator (MISO) and the Independent Electricity System Operator (IESO) submit joint comments in response to the intervene and request for comment by New York Independent System Operator (NYISO) regarding application from ITC to construct, operate and maintain electric transmission facilities at the U.S - Canada Border. Answer to NISO from MISO and IESO 10-13-11.pdf More Documents & Publications Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments and Supplemental Documents

83

Application for Presidential Permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application for Presidential Permit OE Docket No. PP-230-4 Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Motion to Intervene and Comment on behalf of The Public Utilities Commission of Ohio Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Motion to Intervene and Comment on behalf of The Public Utilities Commission of Ohio Application from International Transmission Company to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. Motion to Intervene and Comments of The Public Utilities Comm. of Ohio.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Public Utilities Commission of Ohio

84

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New York Independent New York Independent System Operator Inc Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the New York Independent System Operator Inc Comments of the New York Independent System Operator on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for presidential permit OE Docket No. PP-230-4 New York Independent System Operator Inc More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator Application for Presidential permit OE Docket No. PP-230-4 International

85

Application for Presidential Permit OE Docket No. PP-230-4 Internation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PJM Letter filed Dec 8, 2011 in support of Settlement Agreement Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: PJM Letter filed Dec...

86

Report to Congress: Corridors and Rights-of-Way on Federal Lands...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corridors and Rights-of-Way on Federal Lands Authority to grant, issue, or renew electric transmission ROWs on Federal land is held by the Forest Service (FS) of the U.S....

87

National Interest Electric Transmission Corridors | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Section 1222 of the Energy Policy Act 2005 International Electricity Regulation Presidential Permits Export Authorizations Pending Applications NEPA Other Regulatory...

88

Steady state modelling and analysis of flexible AC transmission systems.  

E-Print Network (OSTI)

??As electric utilities move into more competitive generation supply regimes, with limited scope to expand transmission facilities, the optimisation of existing transmission corridors for power… (more)

Fuerte Esquivel, Claudio Rubén

1997-01-01T23:59:59.000Z

89

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Petition to Intervene and Request for Petition to Intervene and Request for Opportunity to Comment, American Municipal Power and Old Dominion Electric Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Petition to Intervene and Request for Opportunity to Comment, American Municipal Power and Old Dominion Electric Petition to Intervene and Request for Opportunity to Comment on the application for presidential permit OE Docket No. PP-230-4 International Transmission Company made by American Municipal Power and Old Dominion Electric Petition to Intervene and Request for Opportunity to Commnet OE Docket No. PP-230-4 More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to American Municipal Power, Inc. and Old

90

Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

299 Sea Breeze 299 Sea Breeze Pacific Regional Transmission System Inc.: Federal Register Notice Volume 70, No. 33 - Feb. 18, 2005 Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System Inc.: Federal Register Notice Volume 70, No. 33 - Feb. 18, 2005 Application from Sea Breeze Pacific Regional Transmission System Inc to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. - Federal Register Notice Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System Inc More Documents & Publications Application for Presidential Permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System, INC EIS-0183: DOE Notice of Availability of the Record of Decision

91

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from PJM Interconnection LLC from PJM Interconnection LLC Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from PJM Interconnection LLC Response from International Transmission Company to late motion to intervene from PJM Interconnection in the matter of the application for a presidential permit authorizing International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PP 230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from FirstEnergy Service Corporation Application for presidential permit OE Docket No. PP-230-4 International

92

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-4 0-4 International Transmission Company: Response to Late Motion to Intervene and Comments Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene and Comments Answer of International Transmission Company to late motions to intervene and comments of Baltimore Gas and Electric Company, American Electric Power, and Pepco Holdings, Inc. PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Out of Time Petition to Intervene and Comments of Baltimore Gas and Electric Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to American Municipal Power, Inc. and Old

93

Application for presidential permit OE Docket No. PP-305 Montana Alberta  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Register Notice Volume 70, No. 210 - Nov. 1, 2005 Federal Register Notice Volume 70, No. 210 - Nov. 1, 2005 Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Federal Register Notice Volume 70, No. 210 - Nov. 1, 2005 Application from Montana Alberta Tie Ltd to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Federal Register Notice Vol 70 No 210. Application for presidential permit OE Docket No. 305 Montana Alberta Tie Ltd More Documents & Publications Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Update Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Scope Change #1 Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Notice to Intent to Prepare an Environmental Impact Statement and

94

Application for presidential permit OE Docket No. PP-362 Champlain Hudson:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application for presidential permit OE Docket No. PP-362 Champlain Application for presidential permit OE Docket No. PP-362 Champlain Hudson: Federal Register Notice Volume 75, No. 43 - Mar. 5, 2010 Application for presidential permit OE Docket No. PP-362 Champlain Hudson: Federal Register Notice Volume 75, No. 43 - Mar. 5, 2010 Application from Champlain Hudson to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Federal Register Notice Volume 75, No. 43 PP-362 Champlain Hudson Power Express Inc, Federal Register Notice Volume 75, No. 43 More Documents & Publications Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc. Application for presidential permit OE Docket No. PP-362 Champlain Hudson Power Express Inc 2012 Annual Planning Summary for Electricity Delivery and Energy

95

Application for Presidential Permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Motion to Intervene and Comment on Motion to Intervene and Comment on behalf of The Public Utilities Commission of Ohio Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Motion to Intervene and Comment on behalf of The Public Utilities Commission of Ohio Application from International Transmission Company to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. Motion to Intervene and Comments of The Public Utilities Comm. of Ohio.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Public Utilities Commission of Ohio Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene and Comments

96

Application for presidential permit OE Docket No. PP-334 Energia Sierra  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

presidential permit OE Docket No. PP-334 Energia presidential permit OE Docket No. PP-334 Energia Sierra Juarex U.S Transmission LLC - Notice of Intent To Prepare an Environmental Impact Statement: Federal Register Volume 74, No. 36 - Feb. 25, 2009 Application for presidential permit OE Docket No. PP-334 Energia Sierra Juarex U.S Transmission LLC - Notice of Intent To Prepare an Environmental Impact Statement: Federal Register Volume 74, No. 36 - Feb. 25, 2009 Application from Energia Sierra Juarex U.S Transmission LLC to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border. Federal Register Notice of intent to prepare an environmental impact statement on the application. Federal Register Vol 74 No 36 PP-334 Energia Sierra Juarex U.S Transmission LLC More Documents & Publications

97

River Corridor Closure Project Partnering Performance Agreement  

Energy.gov (U.S. Department of Energy (DOE))

WCH and DOE have a mission to complete the clsoure of the Hanford River Corridor by 2015.  Early and efficient completion of this work scope law the River Corridor Closure Contract (DE-AC06...

98

Application for presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

presidential permit OE Docket No. PP-230-2 and presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC Holdings Corporation Limited Partnership, International Transmission Company, and DTE Energy Company Application for presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC Holdings Corporation Limited Partnership, International Transmission Company, and DTE Energy Company Applicatio from ITC Holdings Corporation Limited Partnership, International Transmission Company, and DTE Energy Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC Holdings Corporation Limited Partnership, International Transmission Company, and DTE Energy Company More Documents & Publications

99

Western Energy Corridor -- Energy Resource Report  

Science Conference Proceedings (OSTI)

The world is facing significant growth in energy demand over the next several decades. Strategic in meeting this demand are the world-class energy resources concentrated along the Rocky Mountains and northern plains in Canada and the U.S., informally referred to as the Western Energy Corridor (WEC). The fossil energy resources in this region are rivaled only in a very few places in the world, and the proven uranium reserves are among the world's largest. Also concentrated in this region are renewable resources contributing to wind power, hydro power, bioenergy, geothermal energy, and solar energy. Substantial existing and planned energy infrastructure, including refineries, pipelines, electrical transmission lines, and rail lines provide access to these resources.

Leslie Roberts; Michael Hagood

2011-06-01T23:59:59.000Z

100

Application for Presidential Permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Company - Notice of Supplemental Filing: Federal Company - Notice of Supplemental Filing: Federal Register Notice Volume 76, No. 164 - Aug. 24, 2011 Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company - Notice of Supplemental Filing: Federal Register Notice Volume 76, No. 164 - Aug. 24, 2011 Notice of Supplemental filing on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. PP-230-4_SupplementalFiling.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Filing - Extension of Comments: Federal Register Notice Volume 76, No. 204 - Oct. 21, 2011 Application for Presidental Permit OE Docket No. PP-230-4 International

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Application for Presidential Permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments of the Public Utilities Comments of the Public Utilities Commission of Ohio Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Public Utilities Commission of Ohio Comments of the PUCO on the application from Internation Transmission Company to construct, operate, and maintain electric transmision facilities at the U.S-Canada border. Motion to Intervene and Comments of Public Utilities Comm. of Ohio 5-27-11.pdf More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the New York Independent System Operator Inc Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Independent Electricity System

102

Application for Presidential Permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Filing - Extension of Supplemental Filing - Extension of Comments: Federal Register Notice Volume 76, No. 204 - Oct. 21, 2011 Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Filing - Extension of Comments: Federal Register Notice Volume 76, No. 204 - Oct. 21, 2011 Request to extend the comment period on its supplemental filing on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S.-Canada border. PP-230-4_SupplementalFiling_ExtensionofCommentPeriod10-21.pdf More Documents & Publications Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments and Supplemental Documents Application for Presidental Permit OE Docket No. PP-230-4 International

103

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response of PJM Interconnection, L.L.C. Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company PP-230-4 Response of PJM Interconnection, L.L.C. to Answer of International

104

HANFORD SITE RIVER CORRIDOR CLEANUP  

SciTech Connect

In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

BAZZELL, K.D.

2006-02-01T23:59:59.000Z

105

Application for presidential permit OE Docket No. PP-371 Northern Pass  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application for presidential permit OE Docket No. PP-371 Northern Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Public Scoping Period Reopened: Federal Register Volume 73, No. 183 - Jun. 15, 2011 Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Public Scoping Period Reopened: Federal Register Volume 73, No. 183 - Jun. 15, 2011 The U.S. Department of Energy reopened the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS). NP_ScopingExtension_061511.pdf More Documents & Publications EIS-0463: Extension of Scoping Period Federal Register Notice: National Nuclear Security Administration Site-Wide Environmental Impact Statement for Sandia National Laboratories, New Mexico (SNL/NM) EIS-0426: Notice of Extension of Comment Period

106

Application for presidential permit OE Docket No. PP-371 Northern Pass  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application for presidential permit OE Docket No. PP-371 Northern Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Public Scoping Period Reopened: Federal Register Volume 73, No. 183 - Jun. 15, 2011 Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Public Scoping Period Reopened: Federal Register Volume 73, No. 183 - Jun. 15, 2011 The U.S. Department of Energy reopened the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS). NP_ScopingExtension_061511.pdf More Documents & Publications EIS-0463: Extension of Scoping Period Federal Register Notice: National Nuclear Security Administration Site-Wide Environmental Impact Statement for Sandia National Laboratories, New Mexico (SNL/NM) EIS-0466: Re-opening of Public Scoping Period and Announcement of

107

FACT SHEET: Designation of National Interest Electric Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FACT SHEET: Designation of National Interest Electric Transmission Corridors,As Authorized by the Energy Policy Act of 2005 FACT SHEET: Designation of National Interest Electric...

108

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TEP Sahuarita-Nogales Transmission Line Final EIS TEP Sahuarita-Nogales Transmission Line Final EIS 2-4 Figure 2.1-1. Close-up of Alternative Study Corridors Near Sahuarita and Green Valley. Chapter 2- Proposed Action and Alternatives 2-5 Figure 2.1-2. Close-up of Alternative Study Corridors Near Amado. TEP Sahuarita-Nogales Transmission Line Final EIS 2-6 Figure 2.1-3. Close-up of Alternative Study Corridors Near Nogales. TEP Sahuarita-Nogales Transmission Line Final EIS 2-8 Figure 2.1-4. Western Corridor on the Coronado National Forest. Chapter 2-Proposed Action and Alternatives 2-13 Figure 2.1-5. Central Corridor on the Coronado National Forest. Chapter 2-Proposed Action and Alternatives 2-15 Figure 2.1-6. Crossover Corridor on the Coronado National Forest. TEP Sahuarita-Nogales Transmission Line Final EIS

109

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response to Late Motion to Intervene Response to Late Motion to Intervene from FirstEnergy Service Corporation Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from FirstEnergy Service Corporation Response from International Transmission Company to late motion to intervene from FirstEnergy Service Corporation in the matter of the application for a presidential permit authorizing International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PP-230-4 International Transmission Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene of New York

110

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska Application for Presidential Permit OE Docket No. PP-387 Soule Hydro:...

111

Application for presidential permit OE Docket No. PP-362 Champlain...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home Application for presidential permit OE Docket No. PP-362 Champlain Hudson Power Express Inc Application for presidential permit OE Docket No. PP-362...

112

Application for Presidential Permit OE Docket No. PP-229 Tucson...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company...

113

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Saxman, Alaska Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application for Presidential Permit OE Docket...

114

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from...

115

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application for Presidential Permit OE Docket...

116

Agencies Publish Final Environmental Impact Statement On Energy Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement On Energy Final Environmental Impact Statement On Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement On Energy Corridor Designation in the West Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. Agencies Publish Final Environmental Impact Statement On Energy Corridor Designation in the West More Documents & Publications Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States, November 8, 2007 Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007.

117

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

118

Application for Presidential permit OE Docket No. PP-371 Northern Pass  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presidential permit OE Docket No. PP-371 Northern Presidential permit OE Docket No. PP-371 Northern Pass Transmission: Comments and Requests for Intervention Received on the Amended Application Application for Presidential permit OE Docket No. PP-371 Northern Pass Transmission: Comments and Requests for Intervention Received on the Amended Application PP-371 Comments from Lee Ann Moulder 08/25/13 Comments from Pamela Martin 08/25/13 Comments from Elisha Gray 08/26/13 Comments from Larry Rappaport 08/26/13 Comments from Michael Marino 08/26/13 Comments from Robert Martin 08/26/13 Comments from Linda Upham 09/02/13 Comments from City of Concord 09/20/13 Comments from The Weeks Lancaster Trust 09/12/13 Comments from Campton Conservation Commission 09/13/13 Comments from Bruce Adami 09/16/13 Comments from Anne Moschella 09/16/13

119

Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Pennsylvania's Ethanol Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons to someone by E-mail Share Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Facebook Tweet about Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Twitter Bookmark Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Google Bookmark Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Delicious Rank Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Digg Find More places to share Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on

120

Alternative Fuels Data Center: Provision for Alternative Fuels Corridor  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Provision for Provision for Alternative Fuels Corridor Pilot Projects to someone by E-mail Share Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Facebook Tweet about Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Twitter Bookmark Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Google Bookmark Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Delicious Rank Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Digg Find More places to share Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on AddThis.com... More in this section... Federal

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Commercial Motor Vehicle Roadside Technology Corridor (CMVRTC)  

E-Print Network (OSTI)

Commercial Motor Vehicle Roadside Technology Corridor (CMVRTC) Oak Ridge National Laboratory Safety Security Vehicle Technologies Research Brief T he Commercial Motor Vehicle Roadside Technology in Tennessee to demonstrate, test, evaluation, and showcase innovative commercial motor vehicle (CMV) safety

122

Comments of New England Electric Transmission Corporation on Proposed Open  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New England Electric Transmission Corporation on New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Motion to intervene out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and New England Power Company. Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities FE Docket No 99-1 (PP-76/EA-76) More Documents & Publications Ontario Power Generation Motion to Intervene & Comments in FE Docket No.

123

Application for presidential permit OE Docket No. PP-362 Champlain Hudson:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

362 Champlain 362 Champlain Hudson: Federal Register Notice Volume 75, No. 43 - Mar. 5, 2010 Application for presidential permit OE Docket No. PP-362 Champlain Hudson: Federal Register Notice Volume 75, No. 43 - Mar. 5, 2010 Application from Champlain Hudson to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Federal Register Notice Volume 75, No. 43 PP-362 Champlain Hudson Power Express Inc, Federal Register Notice Volume 75, No. 43 More Documents & Publications Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc. EIS-0447: Amended Notice of Intent to Prepare an Environmental Impact Statement Application for presidential permit OE Docket No. PP-362 Champlain Hudson Power Express Inc

124

Application for presidential permit OE Docket No. PP-305 Montana Alberta  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice to Intent to Prepare an Environmental Impact Notice to Intent to Prepare an Environmental Impact Statement and Conduct Scoping Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Notice to Intent to Prepare an Environmental Impact Statement and Conduct Scoping The Department of Energy (DOE) announces its intention to prepare an EIS and to conduct scoping on the proposed Federal action of granting a Presidential Permit to construct a new electric transmission line across the U.S.-Canada border in northwestern Montana. OE Docket No. PP-305 Notice to Intent to Prepare an Environment Impact Statement and Conduct Scoping: Montana Alberta Tie, Ltd. More Documents & Publications Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Scope Change #1

125

Application for presidential permit OE Docket No. PP-362 Champlain Hudson -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

presidential permit OE Docket No. PP-362 Champlain presidential permit OE Docket No. PP-362 Champlain Hudson - Notice of Intent To Prepare an Environmental Impact Statement: Federal Register Notice Volume 75, No. 117 - Jun. 18, 2010 Application for presidential permit OE Docket No. PP-362 Champlain Hudson - Notice of Intent To Prepare an Environmental Impact Statement: Federal Register Notice Volume 75, No. 117 - Jun. 18, 2010 Application from Champlain Hudson to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Federal Register Notice of intent to prepare an environmental impact statement on the application. Federal Register Vol 75 No 117 PP-362 Champlain Hudson Power Express Inc More Documents & Publications EIS-0447: Notice of Intent to Prepare an Environmental Impact Statement and

126

Application to Export Electric Energy OE Docket No. EA-354 Endure Energy,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Endure 4 Endure Energy, L.L.C.: Federal Register Notice Volume 74, No. 105 - Jun. 3, 2009 Application to Export Electric Energy OE Docket No. EA-354 Endure Energy, L.L.C.: Federal Register Notice Volume 74, No. 105 - Jun. 3, 2009 Application from Endure Energy, L.L.C. to export electric energy to Canada. Federal Register Notice Vol 74 No 105 EA-354 Endure Energy, L.L.C. More Documents & Publications EIS-0399: Notice of Intent to Prepare an Environmental Impact Statement Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System Inc.: Federal Register Notice Volume 70, No. 33 - Feb. 18, 2005 Application to Export Electric Energy OE Docket No. EA-298 ISO New England Inc.: Federal Register Notice Volume 69, No. 218 - Nov. 12, 2004

127

Ontario Power Generation Motion to Intervene & Comments in FE Docket No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ontario Power Generation Motion to Intervene & Comments in FE Ontario Power Generation Motion to Intervene & Comments in FE Docket No. 99-1 Ontario Power Generation Motion to Intervene & Comments in FE Docket No. 99-1 Ontario Power Generation hereby moves to intervene in, and comments on, the DOE's proposed open access requirements for International Electric Transmission Facilities. Ontario Power Company Motion to Intervene & Comments in FE Docket No. 99-1 More Documents & Publications Motion to Intervene and Comments of Public Utility District No. 1 (Pend Oreille County, Washington) on PP 99-1 Notice of Intent to Amend Presidential Permit Motion to intervene and comments of the energy services group of Hydro-Quebec and H.Q. Energy Services (U.S.) Inc, on FE 99-1 Joint Motion to Intervene of Northern States Power Company (Minnesota) et

128

EIS-0490: Boulder City/U.S. 93 Corridor Transportation Improvements,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

490: Boulder City/U.S. 93 Corridor Transportation 490: Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder County, Nevada EIS-0490: Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder County, Nevada SUMMARY The Federal Highway Administration and the Nevada Department of Transportation prepared an EIS to evaluate the potential environmental impacts of the proposed Boulder City/U.S. 93 Bypass Project in Boulder County, Nevada. DOE's Western Area Power Administration, a cooperating agency, adopted the Final EIS and issued a Record of Decision to modify Western's transmission system and facilities to accommodate the construction of the project. The project website is http://www.nevadadot.com/Micro-Sites/BoulderCityBypass/The_Boulder_City_Bypass.aspx. PUBLIC COMMENT OPPORTUNITIES

129

EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36: I-5 Corridor Reinforcement Project, Multnomah County, 36: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington SUMMARY This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Wash., to a new 500-kV substation near Troutdale, Ore. After initially identifying a large number of route segments, BPA combined those segments into four action alternatives (each with options): West, Central, East, and Crossover. The action alternatives and the No Action Alternative are analyzed in the draft EIS. The alternatives vary in length and include both existing and new

130

CERTIFICATION DOCKET WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT  

Office of Legacy Management (LM)

WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects ..-.. --__- _".-.-l--_--l -_._ _- --- ~~~. . ..~ CONTENTS Page - - I NTRODUCTI ON 1 Purpose 1 Docket Contents 1 Exhibit I: Summary of Activities at Westinghouse Atomic Power Development Plant, East Pittsburgh Plant, Forest Hills, Pittsburgh, Pennsylvania I-l Exhibit II: Documents Supporting the Certification of Westinghouse Atomic Power Development Plant, East Pittsburgh Plant, Forest Hills, Pittsburgh, Pennsylvania iii II-1 . . .- .__.^ I ^_... _.-__^-____-. - CERTIFICATION DOCKET WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT

131

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand...

132

Ex parte communication of the California Energy Commission- Docket...  

NLE Websites -- All DOE Office Websites (Extended Search)

communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 Ex parte communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 On...

133

Application for Presidential Permit OE Docket No. PP-235 Sempra...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sempra Energy Resources Application for presidential permit OE Docket No. PP-235-1 Sempra Energy Resources and Termoelectrica U.S LLC Application for Presidential Permit OE Docket...

134

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority...

135

Technology Corridor News - Issue #3, June 2009  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Corridor News C O M M E R C I A L M O T O R V E H I C L E R O A D S I D E T E C H N O L O G Y C O R R I D O R June 2009 Issue 3 Federal Motor Carrier Safety...

136

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 14960 of 15,698 results. Download Order Denying Rehearing: Docket No. 2007-OE-01, Mid-Atlantic Area National Interest Electric Transmission Corridor; Docket No. 2007-0E-02,...

137

Docket Nos. ER02-240-004  

E-Print Network (OSTI)

Duke Energy South Bay, LLC (DESB), a compliance refund report pursuant to a Commission order approving an Offer of Settlement (Settlement) filed in Docket No. ER02-10-000, et al. 1 The Settlement resolved all issues relating to DEO's and DESB's Year 2002 updates to their Reliability Must Run Agreements with the California Independent Operator Corporation. The Settlement also resolved one of the reserved issues left open by a previous settlement in California Independent System Operator

Duke Energy; South Bay; Duke Energy; South Bay; Mark L. Perlis; John T. Carlson

2003-01-01T23:59:59.000Z

138

Energy transport corridors: the potential role of Federal lands in states identified by the Energy Policy Act of 2005, section 368(b).  

DOE Green Energy (OSTI)

On August 8, 2005, the President signed the Energy Policy Act of 2005 (EPAct) into law. In Subtitle F of EPAct, Congress set forth various provisions that would change the way certain federal agencies (Agencies) coordinate to authorize the use of land for a variety of energy-related purposes. As part of Subtitle F of EPAct, Section 368 addresses the issue of energy transportation corridors on federal land for oil, gas, and hydrogen pipelines, as well as electricity transmission and distribution facilities. Because of the critical importance of improving the nation's electrical transmission grid, Congress recognized that electricity transmission issues should receive added attention when the Agencies address corridor location and analysis issues. In Section 368, Congress specifically directed the Agencies to consider the need for upgraded and new facilities to deliver electricity: In carrying out [Section 368], the Secretaries shall take into account the need for upgraded and new electricity transmission and distribution facilities to (1) improve reliability; (2) relieve congestion; and (3) enhance capability of the national grid to deliver electricity. Section 368 does not require the Agencies to consider or approve specific projects, applications for rights-of-way (ROWs), or other permits within designated energy corridors. Importantly, Section 368 does not direct, license, or otherwise permit any on-the-ground activity of any sort. If an applicant is interested in obtaining an authorization to develop a project within any corridor designated under Section 368, the applicant would have to apply for a ROW authorization and applicable permits. The Agencies would consider each application by applying appropriate project-specific reviews under requirements of laws and related regulations, including, but not limited to, the National Environmental Policy Act (NEPA), the Clean Water Act, the Clean Air Act, Section 7 of the Endangered Species Act (ESA), and Section 106 of the National Historic Preservation Act (NHPA). Under Section 368, Congress divided the United States into two groups of states: the 11 contiguous western states and the remaining states. Direction for energy transportation corridor analysis and selection in the 11 western states was addressed in Section 368(a) of EPAct, while direction for energy transportation corridor analysis and selection in all other states was addressed under Section 368(b) of EPAct. It was clearly the priority of Congress to conduct corridor location studies and designation first on federal lands in the western states. Under Section 368(a), the Agencies produced a programmatic environmental impact statement (EIS), Designation of Energy Corridors on Federal Land in the 11 Western States (DOE and DOI 2008), that was used in part as the basis for designating more than 6,000 mi (9,656 km) of energy transportation corridors on federal land in 11 western states. Under Section 368(a) of EPAct, Congress clearly stated the Agencies needed to (1) designate energy transportation corridors on federal land, (2) conduct the necessary environmental review of the designated corridors, and (3) incorporate the designated corridors into the appropriate land use plans. Congressional direction under Section 368(b) of EPAct differs from that provided under Section 368(a). Specifically, Section 368(b) requires the secretaries of the Agencies, in consultation with the Federal Energy Regulatory Commission (FERC), affected utility industries, and other interested persons, to jointly: (1) Identify corridors for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities on federal land in states other than the 11 western states identified under Section 368(a) of EPAct, and (2) Schedule prompt action to identify, designate, and incorporate the corridors into the applicable land use plans. While Section 368(a) clearly directs designation as a necessary first step for energy transportation corridors in the 11 western states, Section 368(b) directs the Agencies to first identify corridor

Krummel, J.; Hlohowskyj, I.; Kuiper, J.; Kolpa, R.; Moore, R.; May, J.; VanKuiken, J.C.; Kavicky, J.A.; McLamore, M.R.; Shamsuddin, S. (Decision and Information Sciences); ( EVS)

2011-09-01T23:59:59.000Z

139

Interstate Clean Transportation Corridor Project Under Way  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

rucks that travel in the western rucks that travel in the western United States will soon be able to operate clean-burning alternative fuel vehicles (AFVs) along the Interstate Clean Transpor- tation Corridor (ICTC). The ICTC project is the first effort to develop clean transportation corridors to connect Los Angeles, San Bernar- dino, the San Joaquin Valley, Sacra- mento/San Francisco, Salt Lake City, Reno, and Las Vegas along routes 1-15, 1-80, and 1-5/CA-99. The ICTC team, headed by California- based Gladstein and Associates, plans to have commitments by early 1997 for 10 to 15 fueling sites located approximately 180 miles apart. These sites will serve 250 new heavy-duty AFVs and 500 local delivery vehicles. Their fuels will displace 4.7 million gallons of petroleum and mitigate more than

140

Application for Presidential Permit OE Docket No. PP-229 Tucson...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Company Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company Application from Tucson Electric Power Company to construct, operate and maintain...

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Application for Presidential Permit OE Docket No. PP-229 Tucson...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No. 183 - Sep. 20, 2000 Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company: Federal Register Notice Volume 65, No. 183 - Sep. 20, 2000...

142

Application for Presidential Permit OE Docket No. PP-257 Emera...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Paper Company, Inc. Application for presidential permit OE Docket No. PP-362 Champlain Hudson Power Express Inc Energy.gov Careers & Internships Funding Opportunities...

143

Application for presidential permit OE Docket No. PP-305 Montana...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement and Conduct Scoping Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Notice to Intent to Prepare an Environmental Impact Statement and...

144

Application for presidential permit OE Docket No. PP-305 Montana...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Scope Change 1 Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Scope Change 1 Application from Montana Alberta Tie Ltd to construct, operate,...

145

Application for presidential permit OE Docket No. PP-305 Montana...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Update Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Update Application from Montana Alberta Tie Ltd to construct, operate, and maintain...

146

Application for presidential permit OE Docket No. PP-305 Montana...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ltd Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd Application from Montana Alberta Tie Ltd to construct, operate, and maintain electric...

147

Application for Presidential Permit OE Docket No. PP-059 Central...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

059 Central Power and Light Company (CPL) Application for Presidential Permit OE Docket No. PP-059 Central Power and Light Company (CPL) Application from Central Power and Light...

148

Application for presidential permit OE Docket No. PP-362 Champlain...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hudson: Federal Register Notice Volume 75, No. 43 - Mar. 5, 2010 Application for presidential permit OE Docket No. PP-362 Champlain Hudson: Federal Register Notice Volume 75, No....

149

Application for presidential permit OE Docket No. PP-362 Champlain...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Intent To Prepare an Environmental Impact Statement: Federal Register Notice Volume 75, No. 117 - Jun. 18, 2010 Application for presidential permit OE Docket No. PP-362...

150

Application for Presidential Permit OE Docket No. PP-044 Northern...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

44 Northern Electric Cooperative Association Application for Presidential Permit OE Docket No. PP-044 Northern Electric Cooperative Association Application from Northern Electric...

151

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Saxman, Alaska Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska Application from Soule Hydro to construct, operate...

152

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Peggy Wilson Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska State Legislature, Peggy Wilson Application from Soule Hydro to...

153

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture Application from Soule Hydro to...

154

Application for Presidential Permit OE Docket No. PP-387 Soule...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from Karen Brand Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand Application from Soule Hydro to construct, operate and...

155

MEMORANDUM RE: Ex Parte Communications in Connection with Docket...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Motor Coalition Petition for Direct Final Rule and the related Rulemaking for Electric Motor performance standards, which is the subject of the above docket number. Attendees of...

156

Conservation corridors affect the fixation of novel alleles  

E-Print Network (OSTI)

populations are a popular conservation strategy (Rosenbergpotential impacts of using conservation corridors to connectNew York. Frankham R (1995) Conservation genetics. Ann. Rev.

Orrock, J L

2005-01-01T23:59:59.000Z

157

Department of Energy Awards Hanford River Corridor Contract To...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis WASHINGTON, DC - U.S. Energy Secretary Samuel Bodman today announced that Washington...

158

2006 National Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study 6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor). Based on the 2006 study, two National Interest Electric Transmission Corridors were designated in 2007. These were invalidated by a federal appeals court in

159

Application for presidential permit OE Docket No. PP-371 Northern Pass  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LLC LLC Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC Pursuant to Executive Order (EO) No. 10485, as amended by EO 12038, and 10 C.F.R. § 205.320 et seq., Northern Pass Transmission LLC (Northern Pass or the Applicant) hereby applies to the United States Department of Energy (DOE) for a Presidential Permit authorizing the construction, connection, operation, and maintenance of facilities for the transmission of electric energy at the international border between the United States and Canada. This application does not seek authority for any export of power from the United States. The information that follows is submitted in support of the Application. APPLICATION OF NORTHERN PASS TRANSMISSION LLC FOR PRESIDENTIAL PERMIT

160

Amended Application for Presidential Permit OE Docket No: PP-371 Northern  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LLC LLC Amended Application for Presidential Permit OE Docket No: PP-371 Northern Pass Transmission LLC Northern Pass Transmission LLC (Northern Pass) has submitted an amended application for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the United States border with Canada. Amended Application of Northern Pass Transmission LLC for Presidential Permit Exhibit 1 - Opinion of Counsel Exhibit 2 - General Area Map of Proposed Route Exhibit 3 - Diagrams of Cross-Section of Underground Cables Exhibit 4 - Drawings of Typical Structure Configurations Exhibit 5 - Chart of Proposed Structure Heights Exhibit 6 - Drawing of Typical Converter Terminal Exhibit 7 - General Area Map of North Section Exhibit 8 - General Area Map of Central Section

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Amended Application for Presidential Permit OE Docket No: PP-371 Northern  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LLC: Federal Register Notice, Volume 78, No. 160 LLC: Federal Register Notice, Volume 78, No. 160 - August 19, 2013 Amended Application for Presidential Permit OE Docket No: PP-371 Northern Pass Transmission LLC: Federal Register Notice, Volume 78, No. 160 - August 19, 2013 Northern Pass Transmission LLC (Northern Pass) has submitted an amended application for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the United States border with Canada. PP-371 Amended Northern Pass Transmission FRN More Documents & Publications EIS-0431: Extension of Public Comment Period Amended Notice of Intent To Modify the Scope of the EIS and Conduct Additional Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement for the Northern Pass Project: Federal Register Notice VOlume

162

Using regulations.gov to find dockets and documents  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

regulations.gov to find dockets and documents regulations.gov to find dockets and documents Regulations.gov is a web-based repository of Federal regulatory documents. Publicly accessible documents associated with DOE Appliance and Equipment Standards rulemakings and related Federal Register notices are now accessible on regulations.gov On regulations.gov, you can: View Proposed and Final Rules and other regulatory documents or notices Read public comments, as well as public meeting presentations and transcripts These documents are part of a docket folder, which contains all documents associated with a particular rulemaking or notice. All current (and most historical) Appliance and Equipment Standards rulemakings have dockets in regulations.gov. You can access a docket via the rulemaking page on the Appliance and Equipment

163

Mixing Fast Trains on Freight Rail Corridors presented by  

E-Print Network (OSTI)

Mixing Fast Trains on Freight Rail Corridors presented by: Minnesota Department of Transportation principles · Why existing freight rail corridors · Challenges · Opportunities · Wrap-up #12;Phase I Projects (2010-2030) Phase II Projects (Future Expansion) Other Freight Lines 2009 Rail Plan (speeds up to 110

Minnesota, University of

164

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Idaho, the state's siting authority is limited to siting approvals on state property, and high voltage transmission lines (115kV or greater) within a National Interstate Electric Transmission Corridor (NIETC). Under these circumstances a Route Permit would be required by the Idaho Public Utilities Commission (IPUC); however, no such corridors have been designated and therefore the process has not been tested. Local governments

165

Department of Energy Awards Hanford River Corridor Contract To Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Awards Hanford River Corridor Contract To Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis WASHINGTON, DC - U.S. Energy Secretary Samuel Bodman today announced that Washington Closure, LLC has been awarded the contract to manage the clean up and remediation of the Columbia River Corridor at the Department of Energy's Hanford Reservation in the state of Washington. The five-member team includes the Washington Group International Inc., Bechtel National Inc., CH2M Hill Inc., Eberline Services Inc., and Integrated Logistics Services Inc. The Columbia River Corridor is composed of roughly 210 square miles along the outer edge of the Hanford Site. The contract calls for cleaning up and

166

Digging Begins at Hazardous Hanford Burial Ground - River Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Digging Begins at Hazardous Hanford Burial Ground - River Corridor Digging Begins at Hazardous Hanford Burial Ground - River Corridor Contractor Spent Two Years Preparing to Remediate 618-10 Digging Begins at Hazardous Hanford Burial Ground - River Corridor Contractor Spent Two Years Preparing to Remediate 618-10 August 3, 2011 - 12:00pm Addthis Media Contacts Cameron Hardy, DOE Cameron.Hardy@rl.doe.gov 509-376-5365 Todd Nelson, Washington Closure media@wch-rcc.com 509-372-9097 RICHLAND, WASH. - After careful preparation and characterization, the Department of Energy's (DOE) River Corridor contractor, Washington Closure Hanford, has begun remediation of one of the most hazardous burial grounds tackled to date on the Hanford Site's River Corridor. The $57 million American Recovery and Reinvestment Act project began with nearly two years of preparation and characterization before reaching their

167

Department of Energy Awards Hanford River Corridor Contract To Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford River Corridor Contract To Hanford River Corridor Contract To Washington Closure, LLC Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis WASHINGTON, DC - U.S. Energy Secretary Samuel Bodman today announced that Washington Closure, LLC has been awarded the contract to manage the clean up and remediation of the Columbia River Corridor at the Department of Energy's Hanford Reservation in the state of Washington. The five-member team includes the Washington Group International Inc., Bechtel National Inc., CH2M Hill Inc., Eberline Services Inc., and Integrated Logistics Services Inc. The Columbia River Corridor is composed of roughly 210 square miles along the outer edge of the Hanford Site. The contract calls for cleaning up and

168

An Inside Look at River Corridor | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

An Inside Look at River Corridor An Inside Look at River Corridor An Inside Look at River Corridor July 16, 2012 - 1:04pm Addthis "River Corridor" provides viewers with a look at the cleanup of hundreds of contaminated buildings and more than one thousand areas where soil was contaminated along the 50-mile stretch of the Columbia River that flows through the Hanford Site in southeast Washington State. Amanda Scott Amanda Scott Former Managing Editor, Energy.gov In the seventh chapter of The Handford Story, the Energy Department takes a look at the River Corridor -- a 50-mile stretch of the Columbia River that flows through the Hanford site in southeast Washington State. This video provides you with an insiders look at the cleanup of contaminated buildings and soil. Watch the video above to get a look inside the Energy

169

Wabash River Heritage Corridor (Indiana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wabash River Heritage Corridor (Indiana) Wabash River Heritage Corridor (Indiana) Wabash River Heritage Corridor (Indiana) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor Industrial Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 1991 State Indiana Program Type Siting and Permitting Provider Wabash River Heritage Corridor Commission The Wabash River Heritage Corridor, consisting of the Wabash River, the Little River, and the portage between the Little River and the Maumee

170

Application for Presidental Permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Filing - Extension of Supplemental Filing - Extension of Comments: Federal Register Notice Volume 76, No. 187 - Sep. 27, 2011 Application for Presidental Permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Filing - Extension of Comments: Federal Register Notice Volume 76, No. 187 - Sep. 27, 2011 Request to extend the comment period on its supplemental filing on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S.-Canada border. PP-230-4_SupplementalFiling_ExtensionofCommentPeriod_9-27.pdf More Documents & Publications Electricity Advisory Committee Notice of Open Meeting October 2 and 3, 2013: Federal Register Notice Volume 78, No. 176 - September 11, 2013 Electricity Advisory Committee Notice of Open Meeting October 19 and 20,

171

CERTIFICATION DOCKET ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLVANIA  

Office of Legacy Management (LM)

$f $f 2 .A , :j. 1' q CERTIFICATION DOCKET ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLVANIA - Department of Energy Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects x- ,m._- ~-____- -.. - CONTENTS - INTRODUCTION Purpose Docket Contents Exhibit I: Summary'of Activities at Rohm & Haas Company, Philadelphia, Pennsylvania Exhibit II: Documents Supporting the Certification of the Rohm & Haas Company, Philadelphia, Pennsylvania iii Page 1 1 1 I-l II-1 .--1----- .",. -._ _ . . - INTRODUCTION TO CERTIFICATION DOCKET ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLVANIA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Terminal Waste Disposal and Remedial Action Projects has reviewed

172

CERTIFICATION DOCKET FOR BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK  

Office of Legacy Management (LM)

BETHLEHEM STEEL CORPORATION BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK Department of Energy Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects CONTENTS Introduction to the Certification Docket for Bethlehem Steel Corporation, Lackawanna, New York Purpose Docket Contents Exhibit I: Summary of Activities at the Bethlehem Steel Corporation, Lackawanna, New York Exhibit II: Documents Supporting the Certification of the Bethlehem Steel Corporation, Lackawanna, New York Page 1 1 2 I-l II- 1 _- . . . 111 Certification Docket Bethlehem Steel Corporation Lackawanna, New York Introduction The Department of Energy (DOE), Office of Nuclear Energy, Office of Terminal Waste Disposal and Remedial Action, Division of Remedial Action

173

Requirements Definition for ORNL Trusted Corridors Project  

SciTech Connect

The ORNL Trusted Corridors Project has several other names: SensorNet Transportation Pilot; Identification and Monitoring of Radiation (in commerce) Shipments (IMR(ic)S); and Southeastern Transportation Corridor Pilot (SETCP). The project involves acquisition and analysis of transportation data at two mobile and three fixed inspection stations in five states (Kentucky, Mississippi, South Carolina, Tennessee, and Washington DC). Collaborators include the State Police organizations that are responsible for highway safety, law enforcement, and incident response. The three states with fixed weigh-station deployments (KY, SC, TN) are interested in coordination of this effort for highway safety, law enforcement, and sorting/targeting/interdiction of potentially non-compliant vehicles/persons/cargo. The Domestic Nuclear Detection Office (DNDO) in the U.S. Department of Homeland Security (DHS) is interested in these deployments, as a Pilot test (SETCP) to identify Improvised Nuclear Devices (INDs) in highway transport. However, the level of DNDO integration among these state deployments is presently uncertain. Moreover, DHS issues are considered secondary by the states, which perceive this work as an opportunity to leverage these (new) dual-use technologies for state needs. In addition, present experience shows that radiation detectors alone cannot detect DHS-identified IND threats. Continued SETCP success depends on the level of integration of current state/local police operations with the new DHS task of detecting IND threats, in addition to emergency preparedness and homeland security. This document describes the enabling components for continued SETCP development and success, including: sensors and their use at existing deployments (Section 1); personnel training (Section 2); concept of operations (Section 3); knowledge discovery from the copious data (Section 4); smart data collection, integration and database development, advanced algorithms for multiple sensors, and network communications (Section 5); and harmonization of local, state, and Federal procedures and protocols (Section 6).

Walker, Randy M [ORNL; Hill, David E [ORNL; Smith, Cyrus M [ORNL; DeNap, Frank A [ORNL; White, James D [ORNL; Gross, Ian G [ORNL; Gorman, Bryan L [ORNL; Hively, Lee M [ORNL; Abercrombie, Robert K [ORNL

2008-02-01T23:59:59.000Z

174

Ex Parte Communication, Docket EERE-BT-DET-0033 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Communication, Docket EERE-BT-DET-0033 On January 22, 2013, representatives from the Edison Electric Institute (EEI) held a conference call with representatives from the U.S....

175

CERTIFICATION DOCKET FOR COLUMBIA UNIVERSITY NEW YORK, NEW YORK  

Office of Legacy Management (LM)

IMP) Sites, March 21 f 1984. Docket Con tents A brief summary of the site description, history and activities of the MED and AEC are discussed in Exhibit I of the certification...

176

Application for presidential permit OE Docket No. PP-305 Montana...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

70, No. 210 - Nov. 1, 2005 Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Federal Register Notice Volume 70, No. 210 - Nov. 1, 2005...

177

Ex Parte Communication, Docket EERE-BT-DET-0033 | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

BT-DET-0033 Ex Parte Communication, Docket EERE-BT-DET-0033 On January 22, 2013, representatives from the Edison Electric Institute (EEI) held a conference call with...

178

Application to Export Electric Energy OE Docket No. 382 Glacial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

82 Glacial Energy of Texas: Federal Register Notice Volume 76, No. 157 - Aug. 15, 2011 Application to Export Electric Energy OE Docket No. 382 Glacial Energy of Texas: Federal...

179

Agencies Publish Final Environmental Impact Statement on Energy Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement on Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 2:07pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The Department of the Interior's Bureau of Land Management and the U.S. Departments of Energy, Agriculture, and Defense (the Agencies) prepared the Final PEIS as part of their work to implement Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines, as well as electricity

180

Agencies Publish Final Environmental Impact Statement on Energy Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement on Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 4:58pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The Department of the Interior's Bureau of Land Management and the U.S. Departments of Energy, Agriculture, and Defense (the Agencies) prepared the Final PEIS as part of their work to implement Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines, as well as electricity

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Ocelot management and conservation along transportation corridors in Southern Texas  

E-Print Network (OSTI)

ocelot and/jaguarundi in Texas. Pages 147-158 in S.D. MillerCORRIDORS IN SOUTHERN TEXAS Michael E. Tewes (361-593-3922,Research Institute, Texas A&M University-Kingsville, MSC

Tewes, Michael E.; Hughes, Robert W.

2001-01-01T23:59:59.000Z

182

Modeling The Santa Monica Freeway Corridor: A Feasibility Study  

E-Print Network (OSTI)

Light Rail Transit," Transportation Research Record. 1494,Rail Transit: Methods of Analysis for DART'SNorth Central Corridor," Transportation ResearchRail Signal Control Strategies by Combining Transit and Traffic Simulation Models," Transportation Research

Skabardonis, Alexander; Dahlgren, Joy; May, Adolf D.

1998-01-01T23:59:59.000Z

183

Application for presidential permit OE Docket No. PP-371 Northern Pass  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Letter of MOU Cancellation Letter of MOU Cancellation Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Letter of MOU Cancellation March 7, 2011 Northern Pass Transmission LLC appreciates the cooperation of the Department of Energy ("DOE") in negotiating the Memorandum of Understanding ("MOU") among DOE, Northern Pass and Normandeau Associates Inc. We nevertheless have concluded that it is desirable to terminate the MOU and the role of Normandeau Associates in the environmental impact statement ("EIS") process so that the EIS can be prepared free of the public concerns that have been voiced. We therefore request DOE's agreement to terminate the MOU and the role of Normandeau Associates as DOE's EIS contractor at this early stage of the process so that the EIS

184

Docket-EO-05-01: Documents Concerning the 2005-2007 Emergency Reliability  

NLE Websites -- All DOE Office Websites (Extended Search)

Docket-EO-05-01: Documents Concerning the Docket-EO-05-01: Documents Concerning the 2005-2007 Emergency Reliability Orders Concerning the Potomac River Generating Station under Section 202(c) of the Federal Power Act Docket-EO-05-01: Documents Concerning the 2005-2007 Emergency Reliability Orders Concerning the Potomac River Generating Station under Section 202(c) of the Federal Power Act The Department of Energy hereby makes the following documents in DOE docket number EO-05-01 available to the public. This proceeding is separate from a proceeding before the Federal Energy Regulatory Commission (FERC) at FERC docket number EL05-145-000. Submissions to DOE's docket are not considered to be filed in the FERC docket, and actions taken in the docket before DOE have no bearing on actions taken by FERC in the docket before it. However,

185

2009 Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Electric Transmission Congestion Study 9 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

186

2009 Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

187

Idaho/Transmission/State Regulations | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State Siting Process The State's direct authority to site high-voltage transmission lines is limited to transmission lines located within National Interstate Electric Transmission Corridors (NIETC); however, no NIETCs currently exist within Idaho so the authority has not been put into practice. Siting authority belongs to local governments or federal agencies that manage the land where the proposed transmission line would be located. Public utilities that

188

Letter Response from the Plumbing Manufacturers Institute (PMI), Docket No.  

NLE Websites -- All DOE Office Websites (Extended Search)

Response from the Plumbing Manufacturers Institute (PMI), Response from the Plumbing Manufacturers Institute (PMI), Docket No. EERE-2010-BT-NOA-0016 - Notice of Availability of Interpretive Rule on the Applicability of Current Water Conservation Standards for Showerheads Letter Response from the Plumbing Manufacturers Institute (PMI), Docket No. EERE-2010-BT-NOA-0016 - Notice of Availability of Interpretive Rule on the Applicability of Current Water Conservation Standards for Showerheads Letter Response from the Plumbing Manufacturers Institute (PMI), Docket No. EERE-2010-BT-NOA-0016 - Notice of Availability of Interpretive Rule on the Applicability of Current Water Conservation Standards for Showerheads. This is the cover letter to additional comments submitted by PMI after alerting the DOE to its belief that the Interpretive Rule should be subject

189

FE DOCKET NO. 10-161-LNG | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FE DOCKET NO. 10-161-LNG FE DOCKET NO. 10-161-LNG FE DOCKET NO. 10-161-LNG ORDER CONDITIONALLY GRANTING LONG-TERM MULTI-CONTRACT AUTHORIZATION TO EXPORT LIQUEFIED NATURAL GAS BY VESSEL FROM THE FREEPORT LNG TERMINAL ON QUINTANA ISLAND, TEXAS TO NON-FREE TRADE AGREEMENT NATIONS Based on a review of the complete record and for the reasons set forth below, DOE/FE has concluded that the opponents of the FLEX Application have not demonstrated that the requested authorization would be inconsistent with the public interest. As further described below, we find that the exports proposed in this Application are likely to yield net economic benefits to the United States. We further find that granting the requested authorization is unlikely to affect adversely the availability of natural gas supplies to domestic consumers or result in natural gas price increases

190

Property:FERC License Docket Number | Open Energy Information  

Open Energy Info (EERE)

License Docket Number License Docket Number Jump to: navigation, search This is a property of type string. Pages using the property "FERC License Docket Number" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/Admirality Inlet Tidal Energy Project + P-12690 + MHK Projects/Algiers Light Project + P-12848 + MHK Projects/Anconia Point Project + P-12928 + MHK Projects/Astoria Tidal Energy + P-12665 + MHK Projects/Avalon Tidal + P-14228 + MHK Projects/Avondale Bend Project + P-12866 + MHK Projects/BW2 Tidal + P-14222 + MHK Projects/Bar Field Bend + P-12942 + MHK Projects/Barfield Point + P-13489 + MHK Projects/Bayou Latenache + P-13542 + MHK Projects/Belair Project + P-13125 + MHK Projects/Bondurant Chute + P-13477 + MHK Projects/Breeze Point + P-13480 +

191

FE DOCKET NO. 11-59-LNG | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FE DOCKET NO. 11-59-LNG FE DOCKET NO. 11-59-LNG FE DOCKET NO. 11-59-LNG ORDER NO. 3324 CONDITIONALLY GRANTING LONG-TERM MULTI-CONTRACT AUTHORIZATION TO EXPORT LIQUEFIED NATURAL GAS BY VESSEL FROM THE LAKE CHARLES TERMINAL TO NON-FREE TRADE AGREEMENT NATIONS Based on a review of the complete record and for the reasons set forth below, DOE/FE has concluded that the opponents of the Lake Charles Exports, LLC (LCE) Application have not demonstrated that the requested authorization will be inconsistent with the public interest. As described below, we find that the exports proposed in this Application are likely to yield net economic benefits to the United States. Accordingly, for this and other reasons set forth below, we are conditionally granting the LCE Application, subject to satisfactory completion of environmental review and

192

CERTIFICATION DOCKET FOR AL-TECH SPECIALTY STEEL CORPORATION  

Office of Legacy Management (LM)

NY. NY. 0 -02-3 CERTIFICATION DOCKET FOR AL-TECH SPECIALTY STEEL CORPORATION (THE F01umz ALLEGHENY-LUDLUM STEEL CORPORATION) WATERVLIET, NEW YORK, AND OFFSITE PROPERTY IN DUNKIRK, NEW YORK Department of Energy Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects CONTENTS Introduction to the Certification Docket for the Al-Tech Specialty Steel Corporation, (the Former Allegheny-Ludlum Steel Corporation) Watervliet, New York, and Offsite Property in Dunkirk, New York Exhibit I: Exhibit II: Purpose Docket Contents Summary of Activities at the Al-Tech Specialty Steel Corporation, (the Former Allegheny-Ludlum Steel Corporation) Watervliet, New York, and Offsite Property in Dunkirk, New York

193

Milford Wind Corridor Phase II | Open Energy Information  

Open Energy Info (EERE)

Milford Wind Corridor Phase II Milford Wind Corridor Phase II Facility Milford Wind Corridor Phase II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner First Wind Developer First Wind Energy Purchaser Southern California Public Power Authority Location Millard and Beaver County UT Coordinates 38.645608°, -112.878027° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.645608,"lon":-112.878027,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

194

Application to Export Electric Energy OE Docket No. EA-290-B...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home Application to Export Electric Energy OE Docket No. EA-290-B Ontario Power Generation, Inc. Application to Export Electric Energy OE Docket No. EA-290-B...

195

Application to Export Electric Energy OE Docket No. EA-387 Energia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Docket No. EA-387 Energia Renovable S.C., LLC: Federal Register Notice, Volume 77, No. 241 - Dec. 14, 2012 Application to Export Electric Energy OE Docket No. EA-336-A...

196

Application for a Presidential Permit OE Docket No. PP-362 Champlain...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home Application for a Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc. Application for a Presidential Permit OE Docket No. PP-362...

197

Ex Parte Communications, Docket Number EERE-2008-BT-STD-0005...  

NLE Websites -- All DOE Office Websites (Extended Search)

Communications, Docket Number EERE-2008-BT-STD-0005, RIN 1904-AB57 Ex Parte Communications, Docket Number EERE-2008-BT-STD-0005, RIN 1904-AB57 On Monday, June 11, 2012,...

198

Ex Parte Communication Docket Number EERE-2008-BT-STD-005 | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Communication Docket Number EERE-2008-BT-STD-005 Ex Parte Communication Docket Number EERE-2008-BT-STD-005 Discussion: Philips staff asked a series of questions regarding the...

199

Application to Export Electric Energy OE Docket No. EA-216-C...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Export Electric Energy OE Docket No. EA-216-C TransAlta Energy Marketing (U.S) Inc . Canadian Electrical Association Comments Application to Export Electric Energy OE Docket No....

200

Application for presidential permit OE Docket No. PP-235-1 Sempra...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

presidential permit OE Docket No. PP-235-1 Sempra Energy Resources and Termoelectrica U.S LLC Application for presidential permit OE Docket No. PP-235-1 Sempra Energy Resources and...

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Application to export electric energy OE Docket No. EA-260-C...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application to export electric energy OE Docket No. EA-260-C EPCOR Energy Marketing (U.S) Inc Application to export electric energy OE Docket No. EA-260-C EPCOR Energy Marketing...

202

Application to export electric energy OE Docket No. EA-382 Glacial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

export electric energy OE Docket No. EA-382 Glacial Energy of Texas Application to export electric energy OE Docket No. EA-382 Glacial Energy of Texas Application from Glacial...

203

Application to Export Electric Energy OE Docket No. 326-A Citigroup...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Docket No. 326-A Citigroup Energy Canada ULC: Federal Register Notice, Volume 77, No. 75 - April 18, 2012 Application to Export Electric Energy OE Docket No. 326-A Citigroup Energy...

204

Application to export electric energy OE Docket No. EA-381 E...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Docket No. EA-381 E-T Global Energy Application from E-T Global Energy to export electric energy to Mexico. Application to export electric energy OD Docket No. EA-381 E-T Global...

205

PP-369 British Columbia Transmission Corporation and British Columbia Hydro  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PP-369 British Columbia Transmission Corporation and British PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Presidential Permit authorizing British Columbia Transmission Corporation and British Columbia Hydro and Power Authority to construct, operate,a dn maintain electric transmission facilities at the U.S. - Canada Border. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority More Documents & Publications PP-369 British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application to Amend Presidential Permit OE Docket No. PP-022-4 British

206

Docket_N._EO-05-01signedby_Secretary_Bodman-_dated_92806.PDF...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DocketN.EO-05-01signedbySecretaryBodman-dated92806.PDF DocketN.EO-05-01signedbySecretaryBodman-dated92806.PDF DocketN.EO-05-01signedbySecretaryBodman-dated92806.P...

207

DOCKET NO. PA02-2-000 STAFF REPORT  

E-Print Network (OSTI)

knowledge of market conditions unavailable to its competitors. This informational trading advantage from EOL for allegations that Williams Energy Marketing & Trading Co. cornered the market for natural gas in California3-26-03 DOCKET NO. PA02-2-000 STAFF REPORT PRICE MANIPULATION IN WESTERN MARKETS FINDINGS

Laughlin, Robert B.

208

Application to Export Electric Energy OE Docket No. EA-357 Hunt Electric  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Hunt 7 Hunt Electric Power Marketing, L.L.C.: Federal Register Notice Volume 74, No. 117 - Jun. 19, 2009 Application to Export Electric Energy OE Docket No. EA-357 Hunt Electric Power Marketing, L.L.C.: Federal Register Notice Volume 74, No. 117 - Jun. 19, 2009 Application from Hunt Electric Power Marketing, L.L.C. to export electric energy to Mexico. Federal Register Notice Vol 74 No 117 EA-357 Hunt Electric Power Marketing, L.L.C. More Documents & Publications EIS-0391: DOE Notice of Availability of a Final Environmental Impact Statement PP-89-1 Bangor Hydro-Electric Company Proposed Open Access Requirement for International Electric Transmission Facilities and Delegation to the Federal Energy Regulatory Commission: Federal Register Notice Volume 64, No. 143 - Jul. 27, 1999

209

Application for presidential permit OE Docket No. PP-230-4 International  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Out of Time and Out of Time and Comments of PEPCO Holdings, INC. Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Petition to Intervene Out of Time and Comments of PEPCO Holdings, INC. Pepco Holdings, Inc. ("PHI"), on its own behalf and on behalf of its affiliates Potomac Electric Power Company ("Pepco"), Atlantic City Electric Company ("Atlantic City"), and Delmarva Power & Light Company ("Delmarva") (collectively, the "PHI Companies"), respectfully submits this petition to intervene out of time and comments in support of the March 25, 2011 filing by PJM Interconnection, L.L.C. ("PJM") in the above-captioned proceeding. PETITION TO INTERVENE OUT OF TIME AND COMMENTS OF PEPCO HOLDINGS, INC.

210

A flying robotic system for power line corridor inspection  

Science Conference Proceedings (OSTI)

So far, the inspection of power line corridors is mainly carried out by manual or helicopters. However, manual inspection is very labour-intensive and inefficient. On the other hand, the cost of the inspection using helicopters is very high. Also the ...

Binhai Wang; Lei Han; Hailong Zhang; Qian Wang; Bingqiang Li

2009-12-01T23:59:59.000Z

211

2009 National Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 National Electric Transmission Congestion Study 9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor). The 2009 study is the second Congestion Study that the Department conducted. The first Congestion Study was conducted in 2006. Preparations

212

Application of Storage Technology for Transmission System Support: Interim Report  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) research in 2011 explored the potential use of battery storage to increase transmission capability in thermal limited transmission paths, an application of energy storage technology that has not been investigated in detail in prior research (see EPRI report 1024586). Researchers performed a conceptual analysis of how batteries connected at either the sending or the receiving end of a congested corridor can be used to increase the transmission capability ...

2012-12-31T23:59:59.000Z

213

Docket No's EERE-2010-BT-TP-0044 and  

NLE Websites -- All DOE Office Websites (Extended Search)

No's EERE-2010-BT-TP-0044 and No's EERE-2010-BT-TP-0044 and EERE-2010-BT-STD-0043 Energy Conservation Program: Energy Conservation Standards and Test Procedures for HID Lamps Docket No's EERE-2010-BT-TP-0044 and EERE-2010-BT-STD-0043 Energy Conservation Program: Energy Conservation Standards and Test Procedures for HID Lamps This memorandum memorializes a communication involving NEMA Lamp Section members and DOE staff in connection with this proceeding. Ex Parte Letter NEMA re DOE HID Lamps Rules.pdf More Documents & Publications EERE-2010-BT-STD-0027 Ex Parte Letter NEMA Motor Training re DOE Motors Rule 15 July 2013. Docket No. EERE-2010-BT-STD-0027 Energy Conservation Standards for Commercial and Industrial Electric Motors: Public Meeting and Availability of the Preliminary Technical Support Document 77 Fed. Reg. 43015 (July 23,

214

CERTIFICATION DOCKET FOR AL-TECHSPECIALTY STEEL CORPORATION  

Office of Legacy Management (LM)

AL-TECHSPECIALTY STEEL CORPORATION AL-TECHSPECIALTY STEEL CORPORATION (THEFoRMERALLEGHENY-LUDLUMSTEELCORPORATION) WATERVLIET,NEWYORK,ANDOFFSITEPROPER?YIN DUNKIRK,NEWYORK Department of Energy Office of Nuciear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects CONTENTS Page Introduction to the Certification Docket for the Al-Tech Specialty Steel Corporation, (the Former Allegheny-Ludlum Steel Corporation) Watervliet, New York, and Offsite Property in Dunkirk, New York Purpose Docket Contents Exhibit I: Summary of Activities at the Al-Teen Specialty Steel Corporation, (the Former Allegheny-Ludlum Steel Corporation) Watervliet, New York, and Offsite Property in Dunkirk, New York Exhibit II: Documents Supporting the Certification of the Al-Tech Specialty Steel Corporation,

215

Transmission Access Charge Informational Filing  

E-Print Network (OSTI)

of any new Participating Transmission Owner (“Participating TO”) during the proceeding six months or (2) changes to Transmission Revenue Requirements of any of the Participating TOs. 1 Because the Access Charges are determined through a formula rate mechanism, these semi-annual adjustments take place automatically. In the enclosed informational filing, the ISO is providing notice regarding the updated Access Charges that reflect the charges that will be in effect beginning January 1, 2002 in accordance with the formula rate. The adjusted charges are based on the modified Transmission Revenue Requirements, both High Voltage and Low Voltage as a result of: (1) the Offer of Settlement accepted by the Commission in Pacific Gas & Electric Company’s (“PG&E”) Docket No. ER01-66-000, (2) San Diego Gas and Electric Company’s supplemental surcharge accepted, subject to refund, in Docket No. ER01-3074-000, and (3) the annual adjustment to the Transmission Revenue Balancing Account (“TRBA”) of the Participating TOs. 1 Capitalized terms not otherwise defined herein are defined in the Master Definitions

unknown authors

2001-01-01T23:59:59.000Z

216

West Vero Corridor, Florida: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Corridor, Florida: Energy Resources Corridor, Florida: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 27.6394769°, -80.4817201° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":27.6394769,"lon":-80.4817201,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

217

Lake Worth Corridor, Florida: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Worth Corridor, Florida: Energy Resources Worth Corridor, Florida: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 26.6184015°, -80.1011539° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.6184015,"lon":-80.1011539,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

218

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

219

2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report  

SciTech Connect

This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractor’s revegetation and mitigation areas on the Hanford Site.

West, W. J.; Lucas, J. G.; Gano, K. A.

2011-11-14T23:59:59.000Z

220

2010 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report  

Science Conference Proceedings (OSTI)

This report documents eh status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with CERLA cleanup of National Priorities List waste sites at Hanford. This report contains vegetation monitoring data that were collected in the spring and summer of 2010 from the River Corridor Closure Contract’s revegetation and mitigation areas on the Hanford Site.

C. T. Lindsey, A. L. Johnson

2010-09-30T23:59:59.000Z

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Milford Wind Corridor Phase I (GE Energy) | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Milford Wind Corridor Phase I (GE Energy) Jump to: navigation, search Name Milford Wind Corridor Phase I (GE Energy) Facility Milford Wind Corridor Phase I (GE Energy) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner First Wind Developer First Wind Energy Purchaser Southern California Public Power Authority Location Milford UT Coordinates 38.52227°, -112.935262° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.52227,"lon":-112.935262,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

222

Application to Export Electric Energy OE Docket No. EA-388 TEC Energy Inc.:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application to Export Electric Energy OE Docket No. EA-388 TEC Application to Export Electric Energy OE Docket No. EA-388 TEC Energy Inc.: Federal Register Notice, Volume 78, No. 208 - Oct. 18, 2013 Application to Export Electric Energy OE Docket No. EA-388 TEC Energy Inc.: Federal Register Notice, Volume 78, No. 208 - Oct. 18, 2013 Application from TEC Energy to export electric energy to Canada. Federal Register Notice. EA-388 TEC CN.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-388 TEC Energy Inc. Application to Export Electric Energy OE Docket No. EA-345-A New Brunswick Energy Marketing Corp: Federal Register Notice, Volume 78, No. 208 - Oct. 28, 2013 Application to Export Electric Energy OE Docket No. EA-258-D Brookfield Energy Marketing Inc.: Federal Register Notice, Volume 78. No. 213 - Nov.

223

Application to export electric energy OE Docket No. EA-348 FPL Energy Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

export electric energy OE Docket No. EA-348 FPL export electric energy OE Docket No. EA-348 FPL Energy Power Marketing Inc: Federal Register Notice Volume 74, No. 15 - Jan. 26, 2009 Application to export electric energy OE Docket No. EA-348 FPL Energy Power Marketing Inc: Federal Register Notice Volume 74, No. 15 - Jan. 26, 2009 Application from FPL Energy Power Marketing Inc to export electric energy to Canada. Federal Register Notice Vol 74 No 15 Application to export electric energy OE Docket No. EA-348 FPL Energy Power Marketing Inc More Documents & Publications Application to Export Electric Energy OE Docket No. EA-348 FPL Energy Power Marketing, Inc. EA-348 FPL Energy Power Marketing, Inc. Application to export electric energy OE Docket No. EA-216-C TransAlta Energy Marketing (U.S) Inc: Federal Register Notice Volume 76, No. 14 -

224

Application to export electric energy OE Docket No. EA-315-A BP Energy:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

export electric energy OE Docket No. EA-315-A BP export electric energy OE Docket No. EA-315-A BP Energy: Federal Register Notice Volume 76, No. 217 - Nov. 9, 2011 Application to export electric energy OE Docket No. EA-315-A BP Energy: Federal Register Notice Volume 76, No. 217 - Nov. 9, 2011 Application from BP Energy to export electric energy to Canada. Federal Register Notice. EA-315-A BP Energy_CN.pdf More Documents & Publications Application to export electric energy OE Docket No. EA-314-A BP Energy: Federal Register Notice Volume 76, No. 217 - Nov. 9, 2011 Application to Export Electric Energy OE Docket No. EA-385 Dynasty Power, Inc: Federal Register Notice, Volume 77, No. 129 - July 5, 2012 Application to Export Electric Energy OE Docket No. EA-211-C DTE Energy Trading Inc: Federal Register Notice, Volume 77, No. 50 -March 14, 2012

225

Application to Export Electric Energy OE Docket No. EA-258-D Brookfield  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Export Electric Energy OE Docket No. EA-258-D Export Electric Energy OE Docket No. EA-258-D Brookfield Energy Marketing Inc.: Federal Register Notice, Volume 78. No. 213 - Nov. 4, 2013 Application to Export Electric Energy OE Docket No. EA-258-D Brookfield Energy Marketing Inc.: Federal Register Notice, Volume 78. No. 213 - Nov. 4, 2013 Application from Brookfield Energy to export electric energy to Canada. Federal Register Notice. EA-258-D Brookfield Energy (CN).pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-145-E Powerex Corporation: Federal Register Notice, Volume 78, No. 213 - Nov. 4, 2013 Application to Export Electric Energy OE Docket No. EA-258-D Brookefield Energy Marketing Inc. Application to Export Electric Energy OE Docket No. EA-338-A Shell Energy

226

El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment  

SciTech Connect

This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

Not Available

1992-04-01T23:59:59.000Z

227

Natural Gas Transmission Pipeline Siting Act (Florida) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Transmission Pipeline Siting Act (Florida) Natural Gas Transmission Pipeline Siting Act (Florida) Natural Gas Transmission Pipeline Siting Act (Florida) < Back Eligibility Commercial Construction Developer Fed. Government Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection This Act establishes a centralized and coordinated permitting process for the location of natural gas transmission pipeline corridors and the construction and maintenance of natural gas transmission pipelines. The Act intends to achieve a reasonable balance between the need for the natural

228

Ex Parte Communication In Connection with DocketNo.EERE-2010...  

NLE Websites -- All DOE Office Websites (Extended Search)

Commercial and Industrial Equipment Ex Parte Communication In Connection with DocketNo.EERE-2010-BT-STD-Q027 Energy Efficiency Program for Certain Commercial and Industrial...

229

Docket No. EERE-2010-BT-STD-0027 Energy Conservation Standards...  

NLE Websites -- All DOE Office Websites (Extended Search)

Preliminary Technical Support Document 77 Fed. Reg. 43015 (July 23, 2012) Docket No. EERE-2010-BT-STD-0027 Energy Conservation Standards for Commercial and Industrial Electric...

230

Application to Export Electric Energy OE Docket No. EA-318-B...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AEP Response to Sierra's Club Response for Temporary Emergency Authorization Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: AEP Response to...

231

Application to Export Electric Energy OE Docket No. EA-306-A...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solutions: Federal Register Notice Volume 75, No. 237 - Dec. 10, 2010 Application to Export Electric Energy OE Docket No. EA-306-A MAG Energy Solutions: Federal Register Notice...

232

Application to Export Electric Energy OE Docket No. EA-297-B...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Enterprises, Canada Ltd: Federal Register Notice Volume 76, No. 41 - Mar. 2, 2011 Application to Export Electric Energy OE Docket No. EA-297-B SESCO Enterprises, Canada Ltd:...

233

Application to Export Electric Energy OE Docket No. EA-297-B...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Enterprises Canada Application to Export Electric Energy OE Docket No. EA-297-B SESCO Enterprises Canada Application of SESCO Enterprises Canada to export electric energy to...

234

Validating alternative methods of modeling wildlife corridors using relocation data from migrating elk and dispersing wolverines.  

E-Print Network (OSTI)

?? Habitat loss and fragmentation increasingly impede wildlife movements that are essential for the long-term persistence of populations. Wildlife corridors facilitating movement have become a… (more)

Rainey, Meredith McClure

2013-01-01T23:59:59.000Z

235

Validating alternative methods of modeling wildlife corridors using relocation data from migrating elk and dispersing wolverines.  

E-Print Network (OSTI)

??Habitat loss and fragmentation increasingly impede wildlife movements that are essential for the long-term persistence of populations. Wildlife corridors facilitating movement have become a key… (more)

Rainey, Meredith McClure.

2012-01-01T23:59:59.000Z

236

Habitat connectivity study of the I-25 and US 85 corridors, Colorado  

E-Print Network (OSTI)

I-25 AND US 85 CORRIDORS, COLORADO Robert J. Henke, Scienceand an influx of people to Colorado have fueled rapid growthand development along the Colorado Front Range, particularly

Henke, Robert J.; Cawood-Hellmund, Paul; Sprunk, Toby

2001-01-01T23:59:59.000Z

237

Docket No. RR09-3-000 – Petition of the North American Electric  

E-Print Network (OSTI)

(NERC) submitted a filing that proposed modifications to the Bylaws of ReliabilityFirst Corporation (ReliabilityFirst). 2. NERC states that the Bylaws ’ amendments consist of two substantive amendments and a number of typographical or clerical corrections and revisions. The two substantive amendments are: (1) changes relating to independent directors in §§7.4(a),7.4(d), 7.4(g), 7.5, 7.7(b), 7.9 and 7.13; and (2) changes relating to electronic transmission in §§5.8, 6.8, 6.9, 6.10.2, 6.10.4, 7.7(a) and 7.11. NERC explains that changes relating to independent directors are intended to allow flexibility so that ReliabilityFirst may appoint an independent director to handle the increasing workload related to hearings, thus increasing the size of the ReliabilityFirst Board of Directors to fifteen members. NERC states that ReliabilityFirst’s proposed changes regarding electronic transmission will clarify that the use of electronic transmission, e.g. facsimile and email, is a valid method providing for actions via written correspondence. In addition, NERC proposes the removal of language concerning financial obligations upon withdrawal of Membership, as those obligations are no longer associated with Membership. 20090522-3038 FERC PDF (Unofficial) 05/22/2009 Docket No. RR09-3-000 2 3. Notice of this filing was issued on March 24, 2009, with comments, protests or motions to intervene due on or before April 14, 2009. 4. Notices of intervention and unopposed timely filed motions to intervene are granted pursuant to the operation of Rule 214 of the Commission’s Rules of Practice and Procedure (18 C.F.R. § 385.214). No protests or adverse comments were filed. 5. NERC’s uncontested filing is approved pursuant to the relevant authority delegated to the Director, Office of Electric Reliability, under 18 C.F.R. §

Rebecca J. Michael

2009-01-01T23:59:59.000Z

238

2006 National Electric Transmission Congestion Study and Related Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study and Related 6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints and identifies areas that are transmission-constrained. This is the first Congestion Study the Department conducted. Based on this study, two National Interest Electric Transmission Corridors were designated in 2007. They were invalidated by a federal appeals court in 2011. Comments and form letters were submitted by the public in response to this study. National Electric Transmission Congestion Study 2006 Executive Summary Full Text of the National Electric Transmission Congestion Study 2006

239

Application to export electric energy OE Docket No. EA-164-C Constellation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

export electric energy OE Docket No. EA-164-C export electric energy OE Docket No. EA-164-C Constellation Energy Commodities Group, Inc: Federal Register Notice Volume 74, No. 151 - Aug. 7, 2009 Application to export electric energy OE Docket No. EA-164-C Constellation Energy Commodities Group, Inc: Federal Register Notice Volume 74, No. 151 - Aug. 7, 2009 Application from Constellation Energy Commodities Group, Inc to export electric energy to Canada. Federal Register Notice Vol 74 No 151 EA-164-C Constellation Energy Commodities Group, Inc More Documents & Publications EA-164-C Constellation Energy Commodities Group, Inc Application to Export Electric Energy OE Docket No. EA-164-C Constellation Energy Commodities Group, Inc Application to Export Electric Energy OE Docket No. EA-353 Boralex Fort

240

Ex Parte Communication - Docket EERE-2012-BT-STD-0022 | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

- Docket EERE-2012-BT-STD-0022 - Docket EERE-2012-BT-STD-0022 Ex Parte Communication - Docket EERE-2012-BT-STD-0022 On September 5, 2012, representatives from PJM Interconnection LLC, National Rural Electric Cooperatives Association, Edison Electric Institute, American Public Power Association, and the Steffes Corporation (together, "Joint Commenters") met with members of the Department of Energy ("Department") to discuss the request for information "[...] Energy Conservation Standards for Residential Water Heaters" and the comments filed therein. DOE_EnergyEfficiencyStandardsForLargeVolumeWaterHeaters.pdf More Documents & Publications Ex Parte Communication, Docket EERE-2012-BT-STD-0022 Ex Parte Communication, Docket EERE-2012-BT-STD-0022 PJM Presentation - The Silver Bullet: Storage! (July 12, 2011)

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Comments of the Northeast Power Coordinating Council FE Docket No. 99-1 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Northeast Power Coordinating Council FE Docket No. the Northeast Power Coordinating Council FE Docket No. 99-1 Comments of the Northeast Power Coordinating Council FE Docket No. 99-1 On July 21, 1999 the Department of Energy, hereinafter "DOE" or the "Department" issued its Notice of Proposed Amendment to the Predidential Permits and Export Authorizations and Delegation and Assignment to the Federal Energy Regulatory Commission. Comments of the Northeast Power Coordinating Council FE Docket No. 99-1 More Documents & Publications Joint comments of consumers energy company and the detriot edison company on notice of proposed amendment. FE Docket No. 99-1 Motion to Intervene and Comments of Public Utility District No. 1 (Pend Oreille County, Washington) on PP 99-1 Notice of Intent to Amend

242

Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application to Export Electric Energy OE Docket No. EA-318-B AEP Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners, Inc: Emergency Filing from AEP Requesting Temporary Export Authorization Extension Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners, Inc: Emergency Filing from AEP Requesting Temporary Export Authorization Extension Application from AEP Energy requesting temporary export authorization extension to export electric energy to Mexico. Emergency Filing from AEP requesting temp ext.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: AEP Response to Sierra's Club Response for Temporary Emergency Authorization Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy

243

Barchan dune corridors: field characterization and investigation of control parameters  

E-Print Network (OSTI)

The structure of the barchan field located between Tarfaya and Laayoune (Atlantic Sahara, Morocco) is quantitatively investigated and compared to that in La Pampa de la Joya (Arequipa, Peru). On the basis of field measurements, we show how the volume, the velocity and the output sand flux of a dune can be computed from the value of its body and horn widths. The dune size distribution is obtained from the analysis of aerial photographs. It shows that these fields are in a statistically homogeneous state along the wind direction and present a `corridor' structure in the transverse direction, in which the dunes have a rather well selected size. Investigating the possible external parameters controlling these corridors, we demonstrate that none among topography, granulometry, wind and sand flux is relevant. We finally discuss the dynamical processes at work in these fields (collisions and wind fluctuations), and investigate the way they could regulate the size of the dunes. Furthermore we show that the overall sand flux transported by a dune field is smaller than the maximum transport that could be reached in the absence of dunes, i.e. in saltation over the solid ground.

Hicham Elbelrhiti; Bruno Andreotti; Philippe Claudin

2006-09-06T23:59:59.000Z

244

GRR/Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor |  

Open Energy Info (EERE)

GRR/Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor GRR/Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor 03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Transportation Harbors Divsion Regulations & Policies Hawaii Revised Statutes Chapter 277 Triggers None specified Click "Edit With Form" above to add content 03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

245

(DOE/EIS-0285/SA-120): Supplement Analysis for the Transmission System Vegetation Management Program FEISq 2/10/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2003 0, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-120 Hanford-Ostrander Corridor Maintenance William Erickson TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management for the Hanford-Ostrander Transmission Line Corridor from Tower 10/4 to Tower 17/2 + 770. The line is a 500kV Single Circuit Transmission Line having an easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as referenced on the attached checklist. Location: The subject right-of-way is located in Benton County, WA. In the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

246

Cultural-resource survey report: Hoover Dam Powerplant Modification Project II. Associated transmission-line facility  

Science Conference Proceedings (OSTI)

The Bureau of Reclamation (Reclamation) is proposing to modify or install additional transmission facilities between the Hoover Dam hydroelectric plant and the Western Area Power Authority substation near Boulder City, Nevada. Reclamation has completed cultural resource investigations to identify historic or prehistoric resources in the project area that might be affected during construction of the transmission line. Four possible transmission corridors approximately 50 feet wide and between 9.5 and 11.5 miles long were investigated. The proposed transmission lines either parallel or replace existing transmission lines. The corridors generally have undergone significant disturbance from past transmission line construction. A Class II sampling survey covering approximately 242 acres was conducted. Access or construction roads have not been identified and surveys of these areas will have to be completed in the future. No historic or prehistoric archeological sites were encountered within the four corridor right-of-ways. It is believed that the probability for prehistoric sites is very low. Four historic period sites were recorded that are outside, but near, the proposed corridor. These sites are not individually eligible for the National Register of Historic Places, but may be associated with the construction of Hoover Dam and contribute to a historic district or multiple property resource area focusing on the dam and its construction.

Queen, R.L.

1991-06-01T23:59:59.000Z

247

National Electric Transmission Congestion Study 2009 Executive Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Executive Summary In the Energy Policy Act of 2005 (EPAct), Con- gress directed the U.S. Department of Energy (DOE) to conduct a study every three years on elec- tric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to in- clude in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmis- sion capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest elec- tric transmission corridor (National Corridor). In August 2006, the Department published its first National Electric

248

Transmission INTRODUCTION  

E-Print Network (OSTI)

Transmission INTRODUCTION An electrical power system requires constant, second by second, balancing to maintain control over the transmission system can result in failure of the entire electrical system of supply, demand, and transmission capability. Transmission system operators are primarily responsible

249

Docket EE-RM/STD-02-112  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Conservation Standards for New Federal Commercial and Multi-Family High-Rise Residential Energy Conservation Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings and New Federal Low-Rise Residential Buildings DOCKET NUMBER: EE-RM/STD-02-112 CLOSING DATE: 02/02/2007 COMMENT NUMBER DATE RECEIVED /DATE OF LETTER NAME & TITLE OF COMMENTATOR AFFILIATION & ADDRESS OF COMMENTATOR 1 01/31/07 01/31/07 Thomas D. Culp, Ph.D Consultant Birch Point Consulting LLC W6025 Rim of the City Road La Cross, WI 54601 2 02/01/07 02/01/07 Renee LaMura Director of Member Services Polyisocyanurate Insulation Manufacturers Association (PIMA) 7315 Wisconsin Ave., Suite 400E Bethesda, MD, 20814 3 02/01/07 02/01/07 Rick L. Landers Business Manager Office of the Chief Engineer Capital Improvements Business Links Naval Facilities Engineering Command

250

Remedial Action Certification Docket - Sodium Reactor Experiment (SRE)  

Office of Legacy Management (LM)

c~-?i-- c~-?i-- I ,3-l Remedial Action Certification Docket - Sodium Reactor Experiment (SRE) .Complex and the Hot Cave Facility (Bldg. 003), Santa Susana ,Fie!d Laboratory, Chatsworth, California ..:'..~::Yerlette Gatl in, MA-232 I am attaching for entry into the Public Document Room, one copy of the N -23 subject documentat ion. These documents are the backup data for the certification that the facilfties are radiologically acceptable for b- unrestricted use as noted in the certification statement published in the &aney Federal Register. Inasmuch as the certification for unrestricted use is 9/2(/85 being published in the Federal Register, it is prudent that the attached documentation also be available to the public. These documents should be retained In accordance with DOE Order 1324.2--disposal schedule 25.

251

ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project  

Science Conference Proceedings (OSTI)

Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor to continue with the project, the Watts Bar Dam Project was canceled and the Exploranium radiation monitors were removed from the doors of Watts Bar Dam in early 2006. The DHS Domestic Nuclear Detection Office decided to proceed with a Pilot building on the ORNL work performed at the TN and SC weigh stations in the highway sector of the Trusted Corridors project and eventually expanded it to other southern states under the name of Southeastern Corridor Pilot Project (SETCP). Many of the Phase I goals were achieved however real-world test data of private watercraft and barges was never obtained.

Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

2011-11-01T23:59:59.000Z

252

Strategy for the Identification of an INL Comprehensive Utility Corridor  

Science Conference Proceedings (OSTI)

This report documents the strategy developed to identify a comprehensive utility corridor (CUC) on the Idaho National Laboratory (INL) Site. The strategy established the process for which the Campus Development Office will evaluate land management issues. It is a process that uses geographical information system geospatial technology to layer critical INL mission information in a way that thorough evaluations can be conducted and strategies developed. The objective of the CUC Project was to develop a process that could be implemented to identify potential utility corridor options for consideration. The process had to take into account all the missions occurring on the INL and other land-related issues. The process for developing a CUC strategy consists of the following four basic elements using geographical information system capabilities: 1. Development of an INL base layer map; this base layer map geospatially references all stationary geographical features on INL and sitewide information. 2. Development of current and future mission land-use need maps; this involved working with each directorate to identify current mission land use needs and future land use needs that project 30 years into the future. 3. Development of restricted and potential constraint maps; this included geospatially mapping areas such as wells, contaminated areas, firing ranges, cultural areas, ecological areas, hunting areas, easement, and grazing areas. 4. Development of state highway and power line rights of way map; this included geospatially mapping rights-of-way along existing state highways and power lines running through the INL that support INL operations. It was determined after completing and evaluating the geospatial information that the area with the least impact to INL missions was around the perimeter of the INL Site. Option 1, in this document, identifies this perimeter; however, it does not mean the entire perimeter is viable. Many places along the perimeter corridor cannot be used or are not economically viable. Specific detailed studies will need to be conducted on a case-by-case basis to clearly identify which sections along the perimeter can and cannot be used. Option 2, in this document, identifies areas along existing highways that could be a viable option. However, discussions would have to take place with the State of Idaho to use their easement as part of the corridor and mission impact would need to be evaluated if a specific request was made to the Department of Energy, Idaho Operations Office. Option 3, in this document, is a combination of Options 1 and 2. This option provides the most flexibility to minimize impacts to INL missions. As with the other two options, discussions and agreements with the State of Idaho would be needed and any specific route would need to be thoroughly evaluated for impact, implementation, and operability beyond just a strategy.

John Reisenauer

2011-05-01T23:59:59.000Z

253

DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors  

Energy.gov (U.S. Department of Energy (DOE))

WASHINGTON, DC - U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability Kevin M. Kolevar today announced the Department's designation of two National...

254

(DOE/EIS-0285/SA-59): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/19/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 19, 2002 April 19, 2002 REPLY TO ATTN OF: KEP SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-59) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis Covington/ Raver Paul / Paul Alston 230 and 500 kV Transmission line Corridor ROW 48/2 to 70/6 and 1/1 to 13/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with a corridor width of 250 to 442 feet. Location: The ROW is located in Thurston County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

255

Application for presidential permit OE Docket No. PP-371 Northern...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LLC submitted an application for a Presidential Permit to construct a 1,200 MW high voltage direct current ("HVDC") transmission line (the "Application") from the Des...

256

Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AEP Response to Sierra's Club Response for Temporary AEP Response to Sierra's Club Response for Temporary Emergency Authorization Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: AEP Response to Sierra's Club Response for Temporary Emergency Authorization Application from AEP Energy Partners to export electric energy to Mexico. AEP Response to Sierra Club response for Temp Emergency Authorization.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: Sierra's Club Opposition to AEP Temporary Emergency Authorization Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: Comments of Sierra Club Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners, Inc: Emergency Filing from AEP Requesting Temporary Export

257

Application to Export Electric Energy OE Docket No. EA-290-B Ontario Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation: Federal Register Notice Volume 76, No. 41 - Mar. Generation: Federal Register Notice Volume 76, No. 41 - Mar. 2, 2011 Application to Export Electric Energy OE Docket No. EA-290-B Ontario Power Generation: Federal Register Notice Volume 76, No. 41 - Mar. 2, 2011 Application from Ontario Power Generation to export electric energy to Canada. Federal Register Notice Vol 76 No 41 EA-290-B Ontario Power Generation More Documents & Publications Application to Export Electric Energy OE Docket No. EA-297-B SESCO Enterprises, Canada Ltd: Federal Register Notice Volume 76, No. 41 - Mar. 2, 2011 Application to Export Electric Energy OE Docket No. EA-209-C Cargill Power Markets: Federal Register Notice Volume 76, No. 66 - Apr. 6, 2011 Application to export electric energy OE Docket No. EA-220-C NRG Power Marketing LLC: Federal Register Notice Volume 75, No. 234 - Dec. 7, 2010

258

Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inc.:Answer of AEP Energy to Sierra Club's Motion to Inc.:Answer of AEP Energy to Sierra Club's Motion to Intervene and Protest Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc.:Answer of AEP Energy to Sierra Club's Motion to Intervene and Protest Application from AEP Energy Partner's Inc to export electric energy to Mexico. Answer of AEP to Sierra Club's Motion to Intervene 2-24-12.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: Comments of Sierra Club Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: AEP Response to Sierra's Club Response for Temporary Emergency Authorization Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: Sierra's Club Opposition to AEP Temporary Emergency

259

Application to Export Electric Energy OE Docket No. EA-345-A New Brunswick  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Register Notice, Volume 78, No. Federal Register Notice, Volume 78, No. 208 - Oct. 28, 2013 Application to Export Electric Energy OE Docket No. EA-345-A New Brunswick Energy Marketing Corp: Federal Register Notice, Volume 78, No. 208 - Oct. 28, 2013 Application from New Brunswick Energy Marketing Corp to export electric energy to Canada. Federal Register Notice. EA-345-A NBEMC CN.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-388 TEC Energy Inc.: Federal Register Notice, Volume 78, No. 208 - Oct. 18, 2013 Application to Export Electric Energy OE Docket No. EA-258-D Brookfield Energy Marketing Inc.: Federal Register Notice, Volume 78. No. 213 - Nov. 4, 2013 Application to Export Electric Energy OE Docket No. EA-338-A Shell Energy North America (US), L.P.: Federal Register Notice, Volume 78, No. 45 -

260

Application to Export Electric Energy OE Docket No. EA-145-D Powerex  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D D Powerex Corporation: Federal Register Notice Volume 73, No. 227 - Nov. 28, 2008 Application to Export Electric Energy OE Docket No. EA-145-D Powerex Corporation: Federal Register Notice Volume 73, No. 227 - Nov. 28, 2008 Application from Powerex Corporation to export electric energy to Mexico. Federal Register Notice Vol 73 No 227 EA-145-D Powerex Corporation More Documents & Publications Application to export electric energy OE Docket No. EA-164-C Constellation Energy Commodities Group, Inc: Federal Register Notice Volume 74, No. 151 - Aug. 7, 2009 Application to export electric energy OE Docket No. EA-220-C NRG Power Marketing LLC: Federal Register Notice Volume 75, No. 234 - Dec. 7, 2010 Application to Export Electric Energy OE Docket No. EA-297-B SESCO

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Application to Export Electric Energy OE Docket No. EA-98-M WSPP Inc:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inc: Federal Register Notice, Volume 77, No. 65 - April 4, 2012 Inc: Federal Register Notice, Volume 77, No. 65 - April 4, 2012 Application to Export Electric Energy OE Docket No. EA-98-M WSPP Inc: Federal Register Notice, Volume 77, No. 65 - April 4, 2012 Application from WSPP Inc. to export electric energy to Canada. Federal Register Notice. EA-98-M WSPP CN.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-296-B Rainbow Energy Marketing Corp: Federal Register Notice, Volume 77, No. 66 - April 4, 2012 Application to Export Electric Energy OE Docket No. EA-321-A to EA-325-A Emera Energy Svcs. Subsidiaries: Federal Register Notice, Volume 77, No. 102 - May 25, 2012 Application to Export Electric Energy OE Docket No. EA-327-A DC Energy LLC: Federal Register Notice, Volume 77, No. 102 - May 25, 2012

262

Application to Export Electric Energy OE Docket No. EA-328-A...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Publications EA-328-A RBC Energy Services LP Application to Export Electric Energy OE Docket No. EA-321-A to Ea-325-A Emera Energy Svcs. Subsidiaries EA-342-A Royal Bank of Canada...

263

Capacity and Energy Payments to Small Power Producers & Cogenerators Under PURPA Docket (Georgia)  

Energy.gov (U.S. Department of Energy (DOE))

Docket No. 4822 was enacted by the Georgia Public Service Commission in accordance with The Public Utility Regulatory Policies Act of 1978 (PURPA) that was enacted to promote conservation and to...

264

DOCKET: A-98-49 Item: II-B1-24  

E-Print Network (OSTI)

DOCKET: A-98-49 Item: II-B1-24 EDOCKET NO: EPA-HQ-OAR-2009-0330 TECHNICAL SUPPORT DOCUMENT ........................................................................15 3.3.3 Organic Ligands

265

DOCKET: A-98-49 Item: II-B2-23  

E-Print Network (OSTI)

DOCKET: A-98-49 Item: II-B2-23 EDOCKET NO: EPA-HQ-OAR-2009-0330 TECHNICAL SUPPORT DOCUMENT ......................................................................... 7-2 7.1.2 Organic Ligands

266

Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sierra's Club Opposition to AEP Temporary Emergency Sierra's Club Opposition to AEP Temporary Emergency Authorization Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: Sierra's Club Opposition to AEP Temporary Emergency Authorization Application from AEP Energy Partners Inc. to export electric energy to Mexico. Sierra's Club Opposition to AEP Request for Temporary Emergency Authorization 2-17-12.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: AEP Response to Sierra's Club Response for Temporary Emergency Authorization Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: Comments of Sierra Club Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners, Inc: Emergency Filing from AEP Requesting Temporary Export

267

Application to Export Electric Energy OE Docket No. EA-145-E Powerex  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corporation: Federal Register Notice, Volume 78, No. 213 - Nov. 4, Corporation: Federal Register Notice, Volume 78, No. 213 - Nov. 4, 2013 Application to Export Electric Energy OE Docket No. EA-145-E Powerex Corporation: Federal Register Notice, Volume 78, No. 213 - Nov. 4, 2013 Application from Powerex Corp to transmit electric energy to Mexico. Federal Register Notice. EA-145-E Powerex Corp (MX).pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-258-D Brookfield Energy Marketing Inc.: Federal Register Notice, Volume 78. No. 213 - Nov. 4, 2013 Application to Export Electric Energy OE Docket No. EA-338-A Shell Energy North America (US), L.P.: Federal Register Notice, Volume 78, No. 45 - March 7, 2013 Application to Export Electric Energy OE Docket No. EA-336-A ConocoPhillips Company: Federal Register Notice, Volume 78, No. 33 - Feb. 19, 2013

268

Application to Export Electric Energy OE Docket No. EA-296-A Rainbow Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corporation: Federal Register Notice Volume 72, Corporation: Federal Register Notice Volume 72, No. 158 - Aug. 16, 2007 Application to Export Electric Energy OE Docket No. EA-296-A Rainbow Energy Marketing Corporation: Federal Register Notice Volume 72, No. 158 - Aug. 16, 2007 Application from Rainbow Energy Marketing Corporation to export energy to Canada. Federal Register Notice Vol 72 No 158 EA-296-A Rainbow Energy Marketing Corporation More Documents & Publications Application to Export Electric Energy OE Docket No. EA-328 RBC Energy Services L.P.: Federal Register Notice Volume 72, No. 158 - Aug. 16, 2007 Application to Export Electric Energy OE Docket No. EA-296-B Rainbow Energy Marketing Corp: Federal Register Notice, Volume 77, No. 66 - April 4, 2012 Application to Export Electric Energy OE Docket No. EA-98-M WSPP Inc:

269

Application for Presidential Permit OE Docket No. PP-387 Soule River  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project; Federal Register Notice, Volume 78, No. 154 - Project; Federal Register Notice, Volume 78, No. 154 - Aug. 9, 2013: Correction Application for Presidential Permit OE Docket No. PP-387 Soule River Hydroelectric Project; Federal Register Notice, Volume 78, No. 154 - Aug. 9, 2013: Correction The Department of Energy corrects a Notice of Application published in the Federal Register (76 FR 50726) on July 30, 2013, to revise the DOE point of contact and program Web site. Federal Register Notice. PP-387 Soule Hydro FRN Correction.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application for Presidential Permit OE Docket No. PP-387 Soule Hydro:

270

Comments on Docket ID: DOE-HQ-2011-0014 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

on Docket ID: DOE-HQ-2011-0014 on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. The signatories of this letter, collectively referred to herein as the California Investor Owned Utilities (CA IOUs) represent some of the largest utility companies in the Western United States, serving over 35 million customers. Comments on Docket ID: DOE-HQ-2011-0014 More Documents & Publications FINAL CA IOU Comment Letter RFI Regulatory Burden O:\IM-20\E-Government Program Office\FDMS\FDMS

271

District of Columbia Public Service Commission. Docket No. EO-05-01 Pepco  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

District of Columbia Public Service Commission. Docket No. EO-05-01 District of Columbia Public Service Commission. Docket No. EO-05-01 Pepco Response to the City of Alexandria's Supplemental Comments District of Columbia Public Service Commission. Docket No. EO-05-01 Pepco Response to the City of Alexandria's Supplemental Comments Docket No. EO-05-01: In accordance with Order No. 202-06-01, issued by the Department of Energy ("DOE") on February 17, 2006, Potomac Electric Power Company ("Pepoo") hereby submits this Response to City of Alexandria Supplemental Comments filed March 23. On or about March 23, 2006, several parties, including the City of Alexandria, filed comments in response to Order No. 202-06-1. The City of Alexandria's Supplemental Comments offer several purported alternatives to maintain

272

Application to Export Electric Energy OE Docket No. EA-327-A DC Energy LLC:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy LLC: Federal Register Notice, Volume 77, No. 102 - May 25, 2012 Energy LLC: Federal Register Notice, Volume 77, No. 102 - May 25, 2012 Application to Export Electric Energy OE Docket No. EA-327-A DC Energy LLC: Federal Register Notice, Volume 77, No. 102 - May 25, 2012 Application from DC Energy to export electric energy to Canada. Federal Register Notice. EA-327_A DC Energy CN.pdf More Documents & Publications Application to Export Electric Energy OE Docket No. EA-321-A to EA-325-A Emera Energy Svcs. Subsidiaries: Federal Register Notice, Volume 77, No. 102 - May 25, 2012 Application to Export Electric Energy OE Docket No. EA-386 IPR-GDF SUEZ Energy Marketing (GSEMNA): Federal Register Notice, Volume 77, No. 129 - July 5, 2012 Application to export electric energy OE Docket No. EA-315-A BP Energy: Federal Register Notice Volume 76, No. 217 - Nov. 9, 2011

273

DOE 10 CFR Part 429, Docket Number: EERE-2010-BT-CE-0014, RIN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE 10 CFR Part 429, Docket Number: EERE-2010-BT-CE-0014, DOE 10 CFR Part 429, Docket Number: EERE-2010-BT-CE-0014, RIN 1904-AC23, Federal Register Vol. 76, No. 75, 21813-15 (Tuesday, April 19, 2011), Notice of Proposed Rule for Energy Conservation Program: Certification, Compliance, and Enforcement fo DOE 10 CFR Part 429, Docket Number: EERE-2010-BT-CE-0014, RIN 1904-AC23, Federal Register Vol. 76, No. 75, 21813-15 (Tuesday, April 19, 2011), Notice of Proposed Rule for Energy Conservation Program: Certification, Compliance, and Enforcement fo DOE 10 CFR Part 429, Docket Number: EERE-2010-BT-CE-0014, RIN 1904-AC23, Federal Register Vol. 76, No. 75, 21813-15 (Tuesday, April 19, 2011), Notice of Proposed Rule for Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment.

274

Comments on Docket ID: DOE-HQ-2011-0014 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. The signatories of this letter, collectively referred to herein as the California Investor Owned Utilities (CA IOUs) represent some of the largest utility companies in the Western United States, serving over 35 million customers. Comments on Docket ID: DOE-HQ-2011-0014 More Documents & Publications FINAL CA IOU Comment Letter RFI Regulatory Burden O:\IM-20\E-Government Program Office\FDMS\FDMS

275

Application to Export Electric Energy OE Docket No. EA-290-B...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home Application to Export Electric Energy OE Docket No. EA-290-B Ontario Power Generation: Federal Register Notice Volume 76, No. 41 - Mar. 2, 2011 Application to...

276

Application to Export Electric Energy OE Docket No. EA-351 DC...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 DC Energy Dakota, LLC Application to Export Electric Energy OE Docket No. EA-351 DC Energy Dakota, LLC Application from DC Energy Dakota, LLC to export electric energy to Canada...

277

Application to Export Electric Energy OE Docket No. EA-327-A...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7-A DC Energy, LLC Application to Export Electric Energy OE Docket No. EA-327-A DC Energy, LLC Application from DC Energy, LLC to export electric energy to Canada. EA-327-A DC...

278

Application to Export Electric Energy OE Docket No. EA-327-A...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7-A DC Energy LLC: Federal Register Notice, Volume 77, No. 102 - May 25, 2012 Application to Export Electric Energy OE Docket No. EA-327-A DC Energy LLC: Federal Register Notice,...

279

Application to Export Electric Energy OE Docket No. EA-387 Energia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Energia Renovable S.C., LLC: Federal Register Notice, Volume 77, No. 241 - Dec. 14, 2012 Application to Export Electric Energy OE Docket No. EA-387 Energia Renovable S.C., LLC:...

280

Application to Export Electric Energy OE Docket No. EA-357 Hunt...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application to Export Electric Energy OE Docket No. EA-357 Hunt Electric Power Marketing, L.L.C.: Federal Register Notice Volume 74, No. 117 - Jun. 19, 2009 Application to Export...

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Application to Export Electric Energy OE Docket No. EA-357 Hunt...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Hunt Electric Power Marketing, L.L.C.: Federal Register Notice Volume 74, No. 117 - Jun. 19, 2009 Application to Export Electric Energy OE Docket No. EA-357 Hunt Electric Power...

282

Docket No. EERE-2012-BT-TP-0046 Ex Parte Communication | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

2-BT-TP-0046 Ex Parte Communication Docket No. EERE-2012-BT-TP-0046 Ex Parte Communication This Memorandum for the Record provides a summary of an October 1, 2013, meeting with DOE...

283

Ex Parte Communication In Connection with DocketNo.EERE-201D...  

NLE Websites -- All DOE Office Websites (Extended Search)

D-BT-STD-Q027 Ex Parte Communication In Connection with DocketNo.EERE-201D-BT-STD-Q027 This memorandum memorializes another communication involving a follow-up to our previous...

284

Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 This memorandum for the record provides a summary of a visit by Mr. Roland Risser, Program Manager, Building Technologies Program,...

285

Docket No. EERE- 2008-BT-STD-0005, RIN 1904-AB57 Ex partecommunicatio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RIN 1904-AB57 Ex parte communication DOE Meeting of June 13, 2012 Docket No. EERE- 2008-BT-STD-0005, RIN 1904-AB57 Ex parte communication DOE Meeting of June 13, 2012...

286

Docket No. EERE-2011-BT-NOA-0067 and RIN Number 1904-AC52 Ex...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-BT-NOA-0067 and RIN Number 1904-AC52 Ex parte Communication Docket No. EERE-2011-BT-NOA-0067 and RIN Number 1904-AC52 Ex parte Communication This memorandum for the record...

287

Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 Ex partecommunication...  

NLE Websites -- All DOE Office Websites (Extended Search)

Ex parte communication Meeting of May 16, 2013 Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 Ex parte communication Meeting of May 16, 2013 This memorandum for the record...

288

Application to Export Electric Energy OE Docket No. EA-358 Twin...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Twin Cities Energy, LLC Application to Export Electric Energy OE Docket No. EA-358 Twin Cities Energy, LLC Application from Twin Cities Energy, LLC to export electric energy to...

289

Application to export electric energy OE Docket No. EA-348 FPL...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marketing, Inc. Application to export electric energy OE Docket No. EA-216-C TransAlta Energy Marketing (U.S) Inc: Federal Register Notice Volume 76, No. 14 - Jan. 21, 2011...

290

Application to Export Electric Energy OE Docket No. EA-289 Intercom...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

& Publications Application to export electric energy OE Docket No. EA-216-C TransAlta Energy Marketing (U.S) Inc: Federal Register Notice Volume 76, No. 14 - Jan. 21, 2011...

291

Application to export electric energy OE Docket No. EA-216-C...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inc Application to export electric energy OE Docket No. EA-216-C TransAlta Energy Marketing (U.S) Inc Application from TransAlta Energy Marketing (U.S) Inc to export electric...

292

Application to Export Electric Energy OE Docket No. EA-216-C...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-C TransAlta Energy Marketing (U.S) Inc Sierra Club Withdrawal Motion Application to Export Electric Energy OE Docket No. EA-216-C TransAlta Energy Marketing (U.S) Inc Sierra Club...

293

Application to export electric energy OE Docket No. EA-216-C...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14 - Jan. 21, 2011 Application to export electric energy OE Docket No. EA-216-C TransAlta Energy Marketing (U.S) Inc: Federal Register Notice Volume 76, No. 14 - Jan. 21, 2011...

294

Application to export electric energy OE Docket No. EA-287-A...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

87-A Emera Energy U.S Subsidiary No. 1 Inc Application to export electric energy OE Docket No. EA-287-A Emera Energy U.S Subsidiary No. 1 Inc Application from Emera Energy U.S...

295

Application to Export Electric Energy OE Docket No. EA-338-A...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy OE Docket No. EA-338-A Shell Energy North America (US), L.P. Application from Shell Energy to export electric energy to Mexico. EA-338-A Shell Energy (MX).pdf More...

296

Application to Export Electric Energy OE Docket No. EA-318-B...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AEP's Response to Emergency Order from DOE Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners Inc: AEP's Response to Emergency Order from DOE...

297

DOE 10 CFR Parts 430 and 431, Docket No. EERE-2010-BT-CE-0014...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Parts 430 and 431, Docket No. EERE-2010-BT-CE-0014 RIN 1904-AC23, Federal Register Vol. 75, No. 88, 25121-24 (Friday, May 7, 2010), Revisions to Energy Efficiency Enforcement...

298

Application to export electric energy OE Docket No. EA-220-C...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-C NRG Power Marketing LLC: Federal Register Notice Volume 75, No. 234 - Dec. 7, 2010 Application to export electric energy OE Docket No. EA-220-C NRG Power Marketing LLC: Federal...

299

Application to Export Electric Energy OE Docket No. EA-326-A...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-A Citigroup Energy Canada ULC Application to Export Electric Energy OE Docket No. EA-326-A Citigroup Energy Canada ULC Application from Citigroup Energy Canada ULC to export...

300

Application to Export Electric Energy OE Docket No. EA-336-A...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6-A ConocoPhillips Company: Federal Register Notice, Volume 78, No. 33 - Feb. 19, 2013 Application to Export Electric Energy OE Docket No. EA-336-A ConocoPhillips Company: Federal...

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Application to Export Electric Energy OE Docket No. EA-356 J...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 J.P. Morgan Commodities Canada Corporation Application to Export Electric Energy OE Docket No. EA-356 J.P. Morgan Commodities Canada Corporation Application from J.P. Morgan...

302

Application to export electric energy OE Docket No. 314-A BP...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

energy OE Docket No. 314-A BP Energy Application from BP Energy to export electric energy to Mexico. EA-314A BP EnergyMX.pdf More Documents & Publications Application to...

303

Application to Export Electric Energy OE Docket No. EA-294-B...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Docket No. EA-294-B TexMex Energy LLC Application from TexMex Energy to export electric energy to Mexico. EA-294-B TexMex Energy (MX).pdf More Documents & Publications EA-294-B...

304

Application to Export Electric Energy OE Docket No. EA-289-B...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-289-B Intercom Energy, Inc Application from Intercom Energy, Inc to export electric energy to Mexico Application to Export Electric Energy OE Docket No. EA-289-B Intercom...

305

Docket-EO-05-01: Documents Concerning the 2005-2007 Emergency...  

NLE Websites -- All DOE Office Websites (Extended Search)

Docket-EO-05-01: Documents Concerning the 2005-2007 Emergency Reliability Orders Concerning the Potomac River Generating Station under Section 202(c) of the Federal Power Act...

306

Idaho/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Local Regulations Idaho/Transmission/Local Regulations < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Local Siting Process The typical siting process for a transmission line in Idaho will fall to the local units of government in the form of local siting permits, because NIETCs are lacking within Idaho. Chapter 65, Title 67 of Idaho Code extends authority to the counties to include transmission corridors in their comprehensive plans and provides ordinance authority and processes for granting such permits. When the siting process falls to the county level,

307

The choice of V/STOL transportation for the Northeast Corridor  

E-Print Network (OSTI)

Aircraft type, aircraft size, number of terminals, and degree of nonstop routing for a V/STOL transportation system in the Northeast Corridor are chosen by exploring a wide range of combinations. Helicopter and STOL aircraft ...

Swan, William M.

1972-01-01T23:59:59.000Z

308

EIS-0406: Designation of Energy Corridors on Federal Land in...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, and the Interior, might have been used for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities. Public Comment Opportunities None...

309

Transmission Line Security Monitor: Final Report  

SciTech Connect

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

310

1996 Wholesale Power and Transmission Rate Schedules.  

Science Conference Proceedings (OSTI)

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

311

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2001 14, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line ROW and the Mossy Rock-Chehalis Transmission Line ROW, between 7/1 to 27/10. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 162 feet. Location: The ROW is located in Lewis County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

312

EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Wash.,...

313

Placing power linres : GIS helps site energy corridors.  

Science Conference Proceedings (OSTI)

Turn the lights on when you enter a room, then turn the lights off when you leave. Most of us repeat this sequence many times each day, and never give it another thought. But that seemingly simple light switch on the wall connects us to one of the most complex systems in the world: the electrical grid. Most of the United States is served by a highly reliable and adequate supply of electrical power, which is distributed through a grid of thousands of miles of electricity-transmission lines. However, as the electricity-supply infrastructure ages and consumer demand for electricity grows, the capacity to deliver electrical power hasn't kept pace with demand, and upgrading the electrical-transmission grid has become a more pressing need. From 1988-1998, demand for transmission grew by 30 percent while transmission grew by only 15 percent. From 1999-2009, demand grew by 20 percent and transmission by only 3 percent Despite a short-term decline related to the economic downturn and improved efficiency, U.S. energy consumption is expected to increase by 14 percent between 2008 and 2035. This growth will drive the need to develop viable routes for new transmission lines. Because transmission lines extend over large distances, they typically cross many federal, tribal, state, local and private land jurisdictions, each with a complex and varying set of siting issues and land-management practices. And as the existing grid needs improvement to meet growing demand, the U.S. is rapidly developing renewable energy sources, particularly solar and wind energy, often in areas far removed from existing electricity-transmission infrastructure and energy-consumption areas.

Kuiper, J. A.; Cantwell, B.; Hlohowskyj, I.; Moore, H. R. (Environmental Science Division)

2011-08-01T23:59:59.000Z

314

To: Mansueti, Lawrence Subject: DCPSC Complaint DOE Docket #EO-05-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sent: Tuesday, November 15, 2005 6:18 PM To: Mansueti, Lawrence Subject: DCPSC Complaint DOE Docket #EO-05-01 Attached please find our letter regarding the DCPSC complaint that we ask you to please file for consideration in DOE's Docket #EO-05-01. Thank you. Elizabeth Chimento and Poul Hertel 1200 North Pitt Street Alexandria, Virginia November 14, 2005 Joseph T. Kelliher, Chairman Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: District of Columbia Public Service Commission Emergency Petition and Complaint Docket No. EL05-145-000 Dear Chairman Kelliher: In the continuing dialogue regarding the Potomac River Generating Station, it is

315

Docket No. EO-05-01: Letter Documenting Department of Energy Receipt of the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Documenting Department of Energy Documenting Department of Energy Receipt of the Mirant Potomac River Compliance Plan Docket No. EO-05-01: Letter Documenting Department of Energy Receipt of the Mirant Potomac River Compliance Plan Docket No. EO-05-01: Letter documenting Department of Energy receipt of the Mirant Potomac River compliance plan, and informing Mirant that additional comments on the plan would be forthcoming. Docket No. EO-05-01: Letter Documenting Department of Energy Receipt of the Mirant Potomac River Compliance Plan More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Motion for Leave to Answer and Answer of Potomac Electric Power Company

316

Ex Parte Communication In Connection with DocketNo.EERE-2010-BT-STD-Q027  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-BT-STD-Q027 Energy Efficiency Program for Certain 0-BT-STD-Q027 Energy Efficiency Program for Certain Commercial and Industrial Equipment Ex Parte Communication In Connection with DocketNo.EERE-2010-BT-STD-Q027 Energy Efficiency Program for Certain Commercial and Industrial Equipment This memorandum memorializes another communication involving a follow-up to the Motor Coalition's previous communications in connection with this proceeding and documented in a memorandum dated April18, 2012. ExParteMemo.pdf More Documents & Publications Ex Parte Communication In Connection with DocketNo.EERE-201D-BT-STD-Q027 Docket No. EERE-2010-BT-STD-0027 Energy Conservation Standards for Commercial and Industrial Electric Motors: Public Meeting and Availability of the Preliminary Technical Support Document 77 Fed. Reg. 43015 (July 23,

317

Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Pursuant to the United States Department of Energy Order No. 202-05-03, issued December 20, 2005 directing Mirant Potomac River to generate electricity at Potomac River Generating Station, PEPCO hereby files this Further Notice of 230kV Circuit Planned Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages More Documents & Publications Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Re: Potomac River Generating Station Department of Energy Case No.

318

Application to Export Electric Energy OE Docket No. EA-338-A Shell Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8-A Shell 8-A Shell Energy North America (US), L.P.: Federal Register Notice, Volume 78, No. 45 - March 7, 2013 Application to Export Electric Energy OE Docket No. EA-338-A Shell Energy North America (US), L.P.: Federal Register Notice, Volume 78, No. 45 - March 7, 2013 Application from Shell Energy to export electric energy to Mexico. Federal Register Notice. EA-338-A Shell Energy-MX.pdf More Documents & Publications Application to Export Electric Energy OE Doc No. EA-339-A Shell Energy North America (US), L.P.: Federal Register Notice, Volume 78, No. 45 - March 7, 2013 Application to Export Electric Energy OE Docket No. EA-258-D Brookfield Energy Marketing Inc.: Federal Register Notice, Volume 78. No. 213 - Nov. 4, 2013 Application to Export Electric Energy OE Docket No. EA-336-A ConocoPhillips

319

Draft Programmatic Environmental Impact Statement fo the Designation of Energy Corridors in the 11 Western States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft WWEC PEIS September 2007 Draft WWEC PEIS September 2007 i DOCUMENT CONTENTS VOLUME I Executive Summary Chapter 1: Why Are Federal Agencies Proposing to Designate Energy Corridors in the West? Chapter 2: What Are the Alternatives Evaluated in This PEIS? Chapter 3: What Are the Potential Environmental Consequences of Corridor Designation and Land Use Plan Amendment? Chapter 4: How Are Cumulative Impacts Evaluated? Chapter 5: What Unavoidable Adverse Impacts Might Be Caused by Corridor Designation and Land Use Plan Amendment? Chapter 6: The Relationship between Local Short-Term Uses of the Environment and Long-Term Productivity Chapter 7: What Irreversible and Irretrievable Commitment of Resources Would Be Involved with Implementation of the Alternatives? Chapter 8: List of Preparers

320

2012 SG Peer Review - Recovery Act: LIPA Smart Energy Corridor Project - Ming Mui, LIPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Program Peer Review Meeting DE-OE0000220 LIPA Long Island Smart Energy Corridor Ming Mui and Sunil Katwala June 8, 2012 December 2008 LIPA Long Island Smart Energy Corridor Objective Life-cycle Funding ($K) Fiscal Years 2010 to 2015 DOE Funding $ 12,496K Total Project Cost $ 25,293K* Technical Scope (Insert graphic here) * Additional funding from LIPA and SUNY Research Foundation Smart Energy Corridor will: (1) Validate Smart Grid technologies; (2) Quantify Smart Grid costs and benefits; (3) Validate Smart Grid applications at a scale that can be readily adapted and replicated in individual homes and businesses. * Demonstrate Technolgy (DA, Sub Auto, AMI, DLC) * Marketing (TOU Rates, Webtools, Visualization) * Cyber Security (Vulneribility Testing & Hardening)

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Herbicide Use Safety for Vegetation Management on Powerline Corridors  

Science Conference Proceedings (OSTI)

This report presents original research on herbicide use safety in association with vegetation management on electric transmission line rights of way.BackgroundThe Electric Power Research Institute (EPRI) conducted integrated vegetation management assessments for five electric utilities between 2006 and 2009, using EPRI-developed procedures and standards of integrated vegetation management performance. Observations during the assessments indicated that utility ...

2012-11-28T23:59:59.000Z

322

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2002 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Allston-Keeler 500 kV Transmission Line ROW exclusive to BLM lands between 8/4 through 27/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 150 feet. Location: The ROW is located in Washington and Columbia County, in the State of Oregon, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

323

*Revisions to POS List, i.e. updates, additions and/or deletions NILAND GAS TURBINE PLANT, DOCKET NO.O6-SPPE-1  

E-Print Network (OSTI)

*Revisions to POS List, i.e. updates, additions and/or deletions NILAND GAS TURBINE PLANT, DOCKET OF CALIFORNIA SMALL POWER PLANT EXEMPTION FOR THE NILAND GAS TURBINE PLANT DOCKET NO. 06-SPPE-1 (Imperial_hahn@urscorp.com #12;*Revisions to POS List, i.e. updates, additions and/or deletions NILAND GAS TURBINE PLANT, DOCKET

324

Trends In U.S. Electric Power Transmission  

SciTech Connect

The report provides an overview of the changes that are occurring in the industry to implement the goals of improved reliability and reduced congestion costs. As the electric industry works to become a more efficient market, transmission stands as a key link between the competitive generation and the regulated distribution sectors. In this role as a key link, transmission is a major focus of government efforts to improve reliability and reduce congestion costs. The scope of the report is to analyze the dominant reliability, investment, siting, and competition/open access trends that are occurring in the domestic electric transmission industry. Topics covered include: the impact of the 2003 Northeast blackout on reliability rules; the move from voluntary to mandatory reliability standards; the advent of real-time transmission system monitoring; ISO/RTO efforts to improve system reliability; the drivers of government intervention in transmission investment; the move towards incentive-based rates for transmission investment; legislative and regulatory efforts to spur transmission investment to support renewable energy resources; the emergence of merchant transmission; the need for federal backstop authority on regional transmission projects; the designation of national interest electric transmission corridors; FERC Orders on siting transmission; the need for changes in open access and competition regulations; FERC efforts to increase open access and competition; legislative efforts to increase competition; and, current competitive issues in the industry.

NONE

2007-11-15T23:59:59.000Z

325

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

326

Central Corridor Light Rail Transit Update Presentation to the University of Minnesota Board of Regents  

E-Print Network (OSTI)

Mall and Knoll · Internal Campus street connections · New traffic lights/reprogramming of existing1 Central Corridor Light Rail Transit Update Presentation to the University of Minnesota Board northerly Light Rail Transit alignment over the existing # 9 railroad bridge that provides for excellent

Amin, S. Massoud

327

Lessons Learned during Creation of the I-65 Biofuels Corridor (White Paper)  

DOE Green Energy (OSTI)

A team of Clean Cities coalitions and state agencies worked together to create a biofuels corridor along I-65 between Indiana and Alabama. The team built relationships with stakeholders and learned the value of strong partnerships, good communication, marketing, and preparation.

Not Available

2009-06-01T23:59:59.000Z

328

(DOE/EIS-0285/SA-105): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (08/22/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 105 Elbe Tap to Alder-LaGrande No. 1 James Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elbe Tap to Alder-LaGrande No.1 and 115kV transmission line from structure 1/1 through structure 7/17. Corridor width varies. The project area is located within Whatcom County, Washington. Location: Transmission line is located at and west of Elbe, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing

329

Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.  

Science Conference Proceedings (OSTI)

Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

330

National Electric Transmission Congestion Study 2006 Executive Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EXECUTIVE EXECUTIVE SUMMARY AUGUST 2006 U.S. Department of Energy NATIONAL ELECTRIC TRANSMISSION CONGESTION STUDY EXECUTIVE SUMMARY AUGUST 2006 U.S. Department of Energy Executive Summary Section 1221(a) of the Energy Policy Act of 2005 amended the Federal Power Act (FPA) by adding a new section 216 to that Act. FPA section 216(a) di- rected the Secretary of Energy to conduct a nation- wide study of electric transmission congestion 1 by August 8, 2006. Based upon the congestion study, comments thereon, and considerations that include economics, reliability, fuel diversity, national en- ergy policy, and national security, the Secretary may designate "any geographic area experiencing electric energy transmission capacity constraints or congestion that adversely affects customers as a na- tional interest electric transmission corridor." The national congestion study

331

(DOE/EIS-0285/SA 108): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Satsop-Aberdeen #2 9/5/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 8, Satsop-Aberdeen #2. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Satsop-Aberdeen #2 230kV transmission line corridor from structure 1/1 through structure 11/5 (reference line). Other lines which are present in the proposed corridor are the Satsop-Aberdeen #3 230 kV, South Elma-Cosmopolis 115kV, and Aberdeen tap to South Elma-Cosmospolis 115kV. Right of way width averages 238 feet. Location: The project area is located in Grays Harbor County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 11 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide

332

DOE/EIS-0285/SA-134: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (Bandon-Rogue-GoldBeach)(3/24/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2003 4, 2003 REPLY TO ATTN OF: KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-134-Bandon-Rogue-GoldBeach) Ben Tilley Natural Resource Specialist - TFE/Alvey Proposed Action: Vegetation Management for the Bandon-Rogue-Gold Beach transmission line corridor. This corridor includes the Bandon-Rogue #1 115 kV transmission line from Bandon Substation to Rogue Substation and the Rogue-Gold Beach #1 and #2 115kV transmission lines, starting at Rogue Substation and ending at Gold Beach Substation. In addition the project includes adjacent portions of the Fairview-Rogue #1 230 kV Transmission Line. Location: The project is located in the BPA Eugene Region, Coos and Curry Counties, Oregon.

333

6450-01-P, DOE 10 CFR Parts 430 and 431, Docket No. EERE-2010-BT-CE-0014  

NLE Websites -- All DOE Office Websites (Extended Search)

6450-01-P, DOE 10 CFR Parts 430 and 431, Docket No. 6450-01-P, DOE 10 CFR Parts 430 and 431, Docket No. EERE-2010-BT-CE-0014 RIN 1904-AC23, Draft Submission to Federal Register, Notice of Revisions to Energy Efficiency Enforcement Regulations, Request for Information/comment. 6450-01-P, DOE 10 CFR Parts 430 and 431, Docket No. EERE-2010-BT-CE-0014 RIN 1904-AC23, Draft Submission to Federal Register, Notice of Revisions to Energy Efficiency Enforcement Regulations, Request for Information/comment. 6450-01-P, DOE 10 CFR Parts 430 and 431, Docket No. EERE-2010-BT-CE-0014 RIN 1904-AC23, Draft Submission to Federal Register, Notice of Revisions to Energy Efficiency Enforcement Regulations, Request for Information/comment. Request for Information (RFI); request for comment regarding DOE's plan to expand and revise its existing energy efficiency enforcement regulations

334

CERTIFICATION DOCKET FOR THE F0RhqE.R SITE OF THE RADIOACTIVE LIQUID WASTE TREATMENT PLANT (TA-45)  

Office of Legacy Management (LM)

CERTIFICATION DOCKET CERTIFICATION DOCKET FOR THE F0RhqE.R SITE OF THE RADIOACTIVE LIQUID WASTE TREATMENT PLANT (TA-45) AND THE EFFLUENT RECEIVING AREAS OF ACID, PUEBLO, AND LOS ALAMOS CANYOM, LOS ALAMOS, NEW MEXICO DEPARTMENT OF ENERGY Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects -. CONTENTS A Page - Introduction to the Certification Docket for the Former Site of the Radioactive Liquid Waste Treatment Plant (TA-45) and the Effluent Receiving Areas of Acid, Pueblo, and Los Alamos Canyons, Los Alamos, New Mexico Description of the Formeriy Utilized Sites Program at the Former Site of the T.4-45 Treatment Plant and Acid, Pueblo, and Los Alamos Canyons Purpose Property Identification Docket Contents

335

Docket No's EERE-2010-BT-TP-0044 andEERE-2010-BT-STD-0043 Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

No's EERE-2010-BT-TP-0044 and EERE-2010-BT-STD-0043 Energy Conservation Program: Energy Conservation Standards and Test Procedures for HID Lamps Docket No's EERE-2010-BT-TP-0044...

336

Notices Docket Numbers: ER11-3935-000. Applicants: CL Power Sales Eight,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Federal Register 2 Federal Register / Vol. 76, No. 131 / Friday, July 8, 2011 / Notices Docket Numbers: ER11-3935-000. Applicants: CL Power Sales Eight, LLC. Description: CL Power Sales Eight, LLC submits tariff filing per 35.37: CL Power Sales Eight, LLC Triennial MBR Update for the NE Region to be effective 6/30/2011. Filed Date: 06/29/2011. Accession Number: 20110629-5160. Comment Date: 5 p.m. Eastern Time on Monday, August 29, 2011. Docket Numbers: ER11-3936-000. Applicants: CP Power Sales Twenty, LLC. Description: CP Power Sales Twenty, LLC submits tariff filing per 35.37: CP Power Sales Twenty, LLC Triennial MBR Update for the NE Region to be effective 6/30/2011. Filed Date: 06/29/2011. Accession Number: 20110629-5161. Comment Date: 5 p.m. Eastern Time on Monday, August 29, 2011.

337

Docket No. EERE-2010-BT-STD-0027 Energy Conservation Standards for  

NLE Websites -- All DOE Office Websites (Extended Search)

0-BT-STD-0027 Energy Conservation 0-BT-STD-0027 Energy Conservation Standards for Commercial and Industrial Electric Motors: Public Meeting and Availability of the Preliminary Technical Support Document 77 Fed. Reg. 43015 (July 23, 2012) Docket No. EERE-2010-BT-STD-0027 Energy Conservation Standards for Commercial and Industrial Electric Motors: Public Meeting and Availability of the Preliminary Technical Support Document 77 Fed. Reg. 43015 (July 23, 2012) This memorandum memorializes a communication involving members of the Motor Coalition (industry and energy advocates) in connection with this proceeding. Letter Motor Coalition re DOE Motors Rule 13May2013.pdf More Documents & Publications EERE-2010-BT-STD-0027 Ex Parte Letter NEMA Motor Training re DOE Motors Rule 15 July 2013. Docket No's EERE-2010-BT-TP-0044 and

338

Docket No. EO-05-01: Letter from Kevin Kolevar, Director Office of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from Kevin Kolevar, Director Office of from Kevin Kolevar, Director Office of Electricity Delivery and Energy Reliability, to Mr. Robert Driscoll, CEO Mirant Mid-Atlantic, LLC Docket No. EO-05-01: Letter from Kevin Kolevar, Director Office of Electricity Delivery and Energy Reliability, to Mr. Robert Driscoll, CEO Mirant Mid-Atlantic, LLC Docket No. EO-05-01: On December 20, 2005, the Secretary of Energy issued DOE Order No. 202-05-3, pursuant to section 202(c) of the Federal Power Act, 16 U.S.c. § 824a(c), ordering the operation of the Potomac River Generating Station (the Plant) owned by Mirant Potomac River, LLC (Mirant). DOE has determined that the operation of the Plant under Option A pursuant to DOE's January 4, 2006 instructions does not provide an adequate level of electric reliability to the Central D.C. area under current circumstances. Operation

339

Intercity passenger rail productivity in the Northeast Corridor : implications for the future of high-speed Rail  

E-Print Network (OSTI)

The ongoing discussion about the future implementation of high-speed rail (HSR) in the Northeast Corridor (NEC) is full of questions on the feasibility of HSR and the ability of Amtrak to implement it. Indeed, the introduction ...

Archila Téllez, Andrés Felipe

2013-01-01T23:59:59.000Z

340

Assessment of the potential diversion of air passengers to high-speed rail in the northeast corridor  

E-Print Network (OSTI)

The high level of intercity passenger travel in the Northeast Corridor is supported by densely populated metropolitan city-centers, the suitable distance between the urban areas, and the extent to which economic and social ...

Clarke, Michael D. D.

1994-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Draft Programmatic Environmental Impact Statement fo the Designation of Energy Corridors in the 11 Western States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WWEC PEIS ES-1 October 2007 WWEC PEIS ES-1 October 2007 EXECUTIVE SUMMARY ES.1 WHY ARE FEDERAL AGENCIES PROPOSING TO DESIGNATE ENERGYCORRIDORS IN THE WEST? On August 8, 2005, the President signed into law the Energy Policy Act of 2005 (EPAct). In Subtitle F of EPAct, Congress set forth various provisions that would change the way certain federal agencies 1 (Agencies) coordinated to authorize the use of land for a variety of energy- related purposes. Section 368 of EPAct requires, among other things, the designation of energy corridors on federal lands in 11 western states 2 and the establishment of procedures to ensure that additional corridors are identified and designated as necessary and to expedite applications to construct or modify oil, gas, and

342

(DOE/EIS-0285/SA-36): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (01/22/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

24, 2002 24, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-38) Benjamin J. Tilley - TFE/Alvey Proposed Action: Vegetation Management along the Wendson-Tahkenith #1 & #2 1/1-20/4, Tahkenitch-Gardiner #1/1-2/3 and Tahkenitch-Reedsport #1/1-4/2 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 100 feet. Location: The ROW is located in Douglas and Lane County, OR, being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

343

(DOE/EIS-0285/SA-43): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 27, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Lower Monumental - McNary 57/2 to 63/5, and Radar Tap 0/4 to 0/10 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 165 and 80 feet respectively. Location: The ROW is located in Umatilla and Franklin County, OR, being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

344

Conservation and Wetland Banking Opportunities Within Transmission Rights-of-Way.  

Science Conference Proceedings (OSTI)

Electric transmission line rights-of-way (ROWs) encompass millions of acres. Some of these lands include aquatic resources and land suitable for threatened or endangered species habitat. Wetland mitigation banking and habitat conservation banking provide legally recognized ways to offset permitted impacts to aquatic resources and wildlife by providing compensatory mitigation "credits" generated by conservation activities. Because ROW corridor lands traverse a variety of aquatic resources and habitats, an...

2008-12-18T23:59:59.000Z

345

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

346

File:03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf | Open Energy  

Open Energy Info (EERE)

HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Jump to: navigation, search File File history File usage Metadata File:03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 31 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 14:14, 29 March 2013 Thumbnail for version as of 14:14, 29 March 2013 1,275 × 1,650 (31 KB) Alevine (Talk | contribs) 12:47, 23 October 2012 Thumbnail for version as of 12:47, 23 October 2012 1,275 × 1,650 (44 KB) Dklein2012 (Talk | contribs) 12:40, 23 October 2012 Thumbnail for version as of 12:40, 23 October 2012 1,275 × 1,650 (44 KB) Dklein2012 (Talk | contribs)

347

Usage of Electric Vehicle Supply Equipment Along the Corridors between the EV Project Major Cities  

DOE Green Energy (OSTI)

The report explains how the EVSE are being used along the corridors between the EV Project cities. The EV Project consists of a nationwide collaboration between Idaho National Laboratory (INL), ECOtality North America, Nissan, General Motors, and more than 40 other city, regional and state governments, and electric utilities. The purpose of the EV Project is to demonstrate the deployment and use of approximately 14,000 Level II (208-240V) electric vehicle supply equipment (EVSE) and 300 fast chargers in 16 major cities. This research investigates the usage of all currently installed EV Project commercial EVSE along major interstate corridors. ESRI ArcMap software products are utilized to create geographic EVSE data layers for analysis and visualization of commercial EVSE usage. This research locates the crucial interstate corridors lacking sufficient commercial EVSE and targets locations for future commercial EVSE placement. The results and methods introduced in this research will be used by INL for the duration of the EV Project.

Mindy Kirkpatrick

2012-05-01T23:59:59.000Z

348

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-151-Big Eddy-Ostrander 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2003 8, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-151-Big Eddy-Ostrander 1 Ed Tompkins Natural Resource Specialist-TFO/LMT Proposed Action: Removal of danger trees along the Big Eddy-Ostrander-1 transmission line corridor. This corridor also includes segments of the Big Eddy-Troutdale, Ostrander-Troutdale, Big Eddy-McLoughlin and Bid Eddy-Chemawa transmission lines. Referencing the Big-Eddy- Ostrander-1 transmission line, the project extends from tower 39/3 to 72/2. The portion of the ROW extending from 39/3 west to 44/5+313 falls within the Zigzag Ranger District of the Mt. Hood National Forest, Clackamas County, Oregon. All work conducted

349

(DOE/EIS-0285/SA 84): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Monroe-Custer No.1 7/1/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July July 1, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 84 Monroe-Custer No.l Don Atkinson -- - TFN/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No. 1500kV transmission line from structure 61/1 through structure 88/4. This project includes contemporaneous vegetation management along the Monroe-Custer No. 2 500kV and the Arlington-Bellingham 230kV transmission line corridors which run parallel to the subject transmission line. Corridor width varies from 140 to 825 feet. (All structure locations referenced in this SA refer to the Monroe-Custer No. 1.) The project area is located within Whatcom County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the

350

Cooperation (Transmission  

E-Print Network (OSTI)

Pricing in Wireless Networks Peter Marbach Department of Computer Science University of Toronto #12; Model/Terminology A B #15; Routes are Fixed #15; C r : Capacity of Node r #15; U r (x r ): Utility Function of Node r 6 #12; Model/Terminology #15; x r : Transmission Rate of Node r #15; y r

Marbach, Peter

351

The Effects of Transportation Corridors' Roadside Design Features on User Behavior and Safety, and Their Contributions to Health, Environmental Quality, and Community Economic Vitality: a Literature Review  

E-Print Network (OSTI)

examined for future transportation corridor design. It isin order to guide future transportation design. Severalin order to guide future transportation design. Several

Macdonald, Elizabeth; Sanders, Rebecca; Supawanich, Paul

2008-01-01T23:59:59.000Z

352

Application for presidential permit OE Docket No. PP-230-2 and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ITC Holdings Corporation Limited Partnership, International Transmission Company, and DTE Energy Company to construct, operate, and maintain electric transmission facilities at the...

353

(DOE/EIS-0285/SA-41): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 27, 2002 February 27, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-41) William Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management around wood poles in Transmission Line ROW's in the Walla Walla Region (see attached checklist for identification). The proposed work will be accomplished in the indicated sections of the transmission line corridors with the easement width ranging from 0 to 200 feet. Location: The ROWs are located in Walla Walla Region (see checklist). Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation around

354

Airspace: Antarctic Sound Transmission  

E-Print Network (OSTI)

Antarctic Sound Transmission Andrea Polli Director,investigates how sound transmission can contribute to thePoles. How have such transmission-based projects developed

Polli, Andrea

2009-01-01T23:59:59.000Z

355

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

356

Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006  

E-Print Network (OSTI)

Interest Electric Transmission Corridors, and the FederalInterest Electric Transmission Corridor designations for theInterest Electric Transmission Corridors, one in the Mid-

2008-01-01T23:59:59.000Z

357

(DOE/EIS-0285/SA 118): Supplement Analysis for the Transmission System Vegetation Management Program EIS, Holcomb-Naselle 115kV)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-SA 118, Holcomb - Naselle 115 kV. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. Right of way width averages 100 feet. Location: The project area is located in Pacific County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective

358

(DOE/EIS-0285-SA-115): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Shelton-Fairmount # 1-4 12/20/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 0, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 115, Shelton- Fairmount # 1-4. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Shelton Fairmount # 1-4 230kV & 115kV transmission lines corridor from structure 34/3 through structure 60/2 (reference line ADNO 8354). Right of way width averages 258 feet. Location: The project area is located in Jefferson County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 26 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and

359

(DOE/EIS-0285/SA-121): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-121): 2/12/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2003 2, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-121 Murry-Custer No. 1 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Murry-Custer No.1 transmission line from structure 1/1 through structure 6/2. Corridor width is 125 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 77.5 acres of right-of-way, 6 miles of access road, and 48 structure sites will be

360

Supplement Analysis for the Transmission System Vegetation Management Program FEIT (DOE/EIS-0285/SA-95) Chehalis-Olympia No. 1 and Chehalis-Centralia No. 2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5) 5) Chehalis-Olympia No.l and Chehalis-Centralia No. 2 James A. Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation management along the Chehalis-Olympia No. 1 and Chehalis-Centralia No. 2, 230kV transmission line. The project area is located within Lewis and Thurston Counties, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 29 miles of access roads and corridor will be treated. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line. See

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

(DOE/EIS-0285/SA-110): Supplement Analysis for the Transmission System Vegetation Management Program FEIS-Covington-Columbia No. 3) 10/2/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-110-Covington-Columbia No. 3 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Covington-Columbia No. 3, 230kV transmission lines from structure 1/1 through structure 12/1. Corridor width varies from 150 feet to 537.5 feet. The project area is located within King County, Washington. Location: The project area is located within King County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Approximately 568.4 acres of the right-of-way will be treated using selective and non-selective methods that include

362

(DOE/EIS-0285/SA-99): Supplement Analysis for the Transmission System Vegetation Management Program FEIS -Olympia-Grand Coulee No.1 8/29/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-99-Olympia-Grand Coulee No. 1 Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Olympia-Grand Coulee No. 1, 287 kV transmission line from structure 53/4 through structure 64/1. Corridor width is 125 feet. Location: The project area is located within King County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. Approximately 163 acres will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded

363

File:WSR process-flowchart-outside-corridor.pdf | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search File Edit History Facebook icon Twitter icon » File:WSR process-flowchart-outside-corridor.pdf Jump to: navigation, search File File history File usage File:WSR process-flowchart-outside-corridor.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 25 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 08:35, 22 October 2012 Thumbnail for version as of 08:35, 22 October 2012 1,275 × 1,650, 2 pages (25 KB) Dklein2012 (Talk | contribs)

364

Milford Wind Corridor Phase I (Clipper) Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Clipper) Wind Farm Clipper) Wind Farm Jump to: navigation, search Name Milford Wind Corridor Phase I (Clipper) Wind Farm Facility Milford Wind Corridor Phase I (Clipper) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner First Wind Developer First Wind Energy Purchaser Southern California Public Power Authority Location Milford UT Coordinates 38.52227°, -112.935262° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.52227,"lon":-112.935262,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

365

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

366

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

367

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

368

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from John Doane Sr.  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

369

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand  

Energy.gov (U.S. Department of Energy (DOE))

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada border.

370

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Jim Cannon  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

371

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Bruce Adami  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

372

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Steve Nogueira  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

373

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Pamela Hanglin  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

374

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Lindsey Coombs  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

375

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Campton Conservation Commission  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S, - Canada Border.

376

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Maureen Quinn  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

377

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Gina Neily  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

378

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Anne Moschella  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

379

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Pamela Hayes  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

380

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Ann Vennerbeck  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Serita Frey  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

382

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Robert Cote  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

383

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Erick Berglund, Jr.  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

384

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Roy Kjendal  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

385

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Susan Seitz  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

386

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Rana Klug  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

387

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Vickie Bedard  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

388

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Nicholas Karakoudas  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

389

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Lorna Rose  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

390

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Michelle Kleindienst  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

391

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Courtney Kearley  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

392

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Taras Kucman  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

393

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority  

Energy.gov (U.S. Department of Energy (DOE))

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

394

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Dept. of Agriculture  

Energy.gov (U.S. Department of Energy (DOE))

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada border.

395

Docket No. EERE-2008-BT-STD-0005. RIN 1904-AB57 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

2008-BT-STD-0005. RIN 1904-AB57 2008-BT-STD-0005. RIN 1904-AB57 Docket No. EERE-2008-BT-STD-0005. RIN 1904-AB57 This memorandum for the record provides a summary of a February 13, 2013 meeting with U.S. Department of Energy staff concerning DOE's proposed rulemaking regarding amended energy conservation standards for Class A external power supplies (EPSs) and new energy conservation standards for non-Class A EPSs and battery chargers. CEA Ex Parte Discussion_02212013.pdf More Documents & Publications Request for Information on Evaluating New Products for the Battery Chargers and External Power Supply Rulemaking - Ex Parte Communication HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers and External Power Supplies HP Ex Parte Memo on Proposed Rulemaking for Battery Chargers and External

396

Microsoft Word - PSEG Companies Comments in OE Docket No RRTT-IR-001.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

K. Richter K. Richter Assistant General Regulatory Counsel Regulatory Department 80 Park Plaza, T5C, Newark, NJ 07102-4194 tel: 973.430.6451 fax: 973.802.1267 email: david.richter@pseg.com March 28, 2012 VIA ELECTRONIC FILING Lamont Jackson Office of Electricity Delivery and Energy Reliability Mail Code OE-20 U.S. Department of Energy, 1000 Independence Avenue, SW. Washington, DC 20585 RE: DOE's Request for Information OE Docket No. RRTT-IR-001 Dear Mr. Jackson, Public Service Electric and Gas Company ("PSE&G") 1 , PSEG Power LLC ("PSEG Power") and PSEG Energy Resources & Trade LLC ("PSEG ER&T") (collectively referred to herein as the "PSEG Companies") respectfully submit the following comments in response to the Department of Energy's ("DOE") Request for

397

Notices DEPARTMENT OF ENERGY [OE Docket No. EA-318-B] Application To Export Electric Energy;  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Federal Register 4 Federal Register / Vol. 77, No. 6 / Tuesday, January 10, 2012 / Notices DEPARTMENT OF ENERGY [OE Docket No. EA-318-B] Application To Export Electric Energy; AEP Energy Partners, Inc. AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: AEP Energy Partners, Inc. (AEPEP) has applied to renew its authority to transmit electric energy from the United States to Mexico pursuant to section 202(e) of the Federal Power Act (FPA). DATES: Comments, protests, or motions to intervene must be submitted on or before February 9, 2012. ADDRESSES: Comments, protests, or motions to intervene should be addressed to: Christopher Lawrence, Office of Electricity Delivery and Energy Reliability, Mail Code: OE-20, U.S.

398

MEMORANDUM RE: Ex Parte Communications in Connection with Docket No. EERE-2010-BT-STD-0027  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 21, 2013 May 21, 2013 Encl: Motor Coalition Presentation This memorandum memorializes a communication involving members of the Motor Coalition (industry and energy advocates) in connection with this proceeding. The Motor Coalition thanks the DOE for permitting us to meet with you on May 13 th , 2013 to discuss the Motor Coalition Petition for Direct Final Rule and the related Rulemaking for Electric Motor performance standards, which is the subject of the above docket number. Attendees of the May 13 th meeting were as follows: John Cymbalsky (DOE), Ashley Armstrong (DOE), Matthew Nardotti (Navigant), John Malinowski (Baldor), Emmanuel Agammloh (Advanced Energy), Kit Butler(Advanced Energy), Michael Kido (DOE), Jim Raba (DOE), Roger Daugherty (Baldor), Neal Elliott (ACEEE), Rob Boteler (Nidec), Michael Rivest (Navigant), Ami

399

Hydromechanical transmission  

DOE Patents (OSTI)

A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

Orshansky, Jr. deceased, Elias (LATE OF San Francisco, CA); Weseloh, William E. (San Diego, CA)

1978-01-01T23:59:59.000Z

400

(DOE/EIS-0285-SA-100): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 8/15/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-100) Joe Johnson Natural Resource Specialist TFS/Kalispell Proposed Action: Vegetation Management along the Libby-Conkelly, 1/2 to 26/4 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 125 feet to 250 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Lincoln and Flathead County, MT, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-34) (12/3/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2001 3, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-34) Bill Erickson - TFP/Walla Walla Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the McNary-Ross Transmission Line ROW between 152/3+2120 to 153/4. The line is 345 kV Single Circuit Transmission Line (project includes adjacent N. Bonneville-Ross 230 kV Single Circuit Transmission Line) having a combined easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Skamania County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA).

402

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2003 5, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap Tom Murphy Natural Resource Specialist - TFS/Bell-1 Proposed Action: Vegetation Management for the East Ellensburg Tap, 1/6 to 3/19 Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line with no easement width. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Kittatas County, WA being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear unwanted vegetation in the rights-of-ways and around transmission line structures that may impede the operation and maintenance of the

403

(DOE/EIS-0285/SA-127): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP/4 KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-127- Eugene-Alvey#2 Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Eugene-Alvey 115 kV transmission line from structure 7/1 through structure 12/2m, and along portions of the following adjacent transmission lines: Hawkins-Alvey 115KV and Alvey-Lane 115KV. Location: The project is located in the BPA Eugene Region in Lane County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to

404

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

405

Regulations for Electric Transmission and Fuel Gas Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long...

406

(DOE/EIS-0285/SA 107): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Elma-Cosmopolis #1 9/5/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 7, Elma-Cosmopolis #1. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elma-Cosmopolis #1 115kV transmission line corridor from structure 11/7 through structure 20/3. Right of way width averages 100 feet. Location: The project area is located in Grays Harbor County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridors. Approximately 8 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 2.8 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites

407

DOE Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop November 1, 2012 Federal Energy Regulatory Commission Commissioner Cheryl LaFleur 1 FERC's Transmission Efforts Reliability and Grid Security Planning...

408

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Usage Transmission Transmission Once electricity is generated -- whether by burning fossil fuels; through nuclear fission; or by harnessing wind, solar, geothermal, or hydro...

409

Merchant transmission investment  

E-Print Network (OSTI)

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

410

Application for presidential permit OE Docket No. PP-362 Champlain Hudson Power Express Inc  

Energy.gov (U.S. Department of Energy (DOE))

Application from Champlain Hudson Power Express Inc to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border.

411

Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Scope Change #1  

Energy.gov (U.S. Department of Energy (DOE))

Application from Montana Alberta Tie Ltd to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. Scope Change #1

412

Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Update  

Energy.gov (U.S. Department of Energy (DOE))

Application from Montana Alberta Tie Ltd to construct, operate, and maintain electric transmission facilities at the U.S-Canada border.

413

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

414

ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED WITHDRAWAL OF PUBLIC LANDS WITHIN AND SURROUNDING THE CALIENTE RAIL CORRIDOR, NEVADA  

SciTech Connect

The purpose for agency action is to preclude surface entry and the location of new mining claims, subject to valid existing rights, within and surrounding the Caliente rail corridor as described in the Yucca Mountain FEIS (DOE 2002). This protective measure is needed to enhance the safe, efficient, and uninterrupted evaluation of land areas for potential rail alignments within the Caliente rail corridor. The evaluation will assist the DOE in determining, through the Rail Alignment environmental impact statement (EIS) process, whether to construct a branch rail line, and to provide support to the BLM in deciding whether or not to reserve a ROW for the rail line under the Federal Land Policy and Management Act (FLPMA). The BLM participated as a cooperating agency in preparing this EA because it is the responsible land manager and BLM staff could contribute resource specific expertise.

DOE

2005-12-01T23:59:59.000Z

415

DOCKET NO. E-999/CI-01-1023 ORDER ESTABLISHING STANDARDS PROCEDURAL HISTORY  

E-Print Network (OSTI)

statute directs the Commission to initiate a proceeding to establish standards for the terms under which an electric utility would permit a plant with the capacity to generate up to ten megawatts (MW) of power to interconnect with the electric grid. On August 20, 2001, the Commission issued its ORDER INITIATING DOCKET, inviting people to propose standards, and inviting people to comment on the proposed standards. On June 19, 2002, the Commission issued its ORDER ORGANIZING WORK GROUPS AND SETTING PROCEDURAL SCHEDULE. That Order directed industry work groups, under the leadership of the Minnesota Department of Commerce (the Department), to develop guidelines for tariffs designed to help a generator interconnect with an electric utility’s system, to make periodic reports on their progress, and to make a final report by February, 2003. On February 3, 2003, the Department filed a report, and supplemented it on February 14. The report identified topics on which the participants had reached consensus and topics on which disagreements remained, and noted that participants continued to work on developing technical standards. At the Department’s recommendation, the Commission solicited comments on the

Marshall Johnson; Ken Nickolai; Thomas Pugh; Phyllis A. Reha; For Utility Tariffs For Interconnection

2001-01-01T23:59:59.000Z

416

Microsoft Word - DOE RFI on Transmission Planning - PGE Comments.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments of Pacific Gas & Electric Company Comments of Pacific Gas & Electric Company Department of Energy Request for Information on Transmission Permitting [OE Docket No. RRTT-IR-001] Pacific Gas & Electric Company (PG&E) appreciates the opportunity to respond to the questions from the Department of Energy (DOE) in its Request for Information (RFI) related to the permitting of transmission lines. The RFI lists six (6) questions, several of them with subparts. PG&E responds to the questions sequentially as they are listed in the RFI. As discussed in more detail below, increased alignment across the federal, state and local agencies for permitting and improved planning coordination would improve the development time for transmission and generation. Improved focus on planning would result in a more

417

Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.  

SciTech Connect

The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

418

Independent transmission company (ITC) and markets for transmission  

E-Print Network (OSTI)

Independent Abstract-- transmission company (ITC) and markets for transmission Yong T. Yoon Marija a fundamental structure for the transmission provider (TP) composed of the independent transmission company (ITC out the associated functions including managing transmission congestion. At the minimum

Ilic, Marija D.

419

Request for Comments Regarding Rates, Accounting and Financial Reporting for New Electric Storage Technologies Docket No. AD10-13-000  

E-Print Network (OSTI)

Innovation, under 18 C.F.R. § 375.315, comments are requested in the above-referenced docket regarding rates, accounting and financial reporting associated with services provided by electric storage technologies. 1 Commission staff has been considering the growing interest in the use of nontraditional technologies to help meet the Nation’s electricity needs. In particular, newer storage technologies like flywheels and chemical batteries have recently achieved technological maturity and are well into successful pilot stages and, in some cases, commercial operation. The roles of traditional generation, transmission, and distribution assets within the electric system are well understood and each has set method(s) of rate recovery, accounting and financial reporting. However, the same is not necessarily true of electric storage. Under appropriate circumstances, storage can act like any of the traditional asset categories, and also like load. The only electricity storage technology that has been widely adopted to date, pumped storage hydropower, was generally built at a time when the majority of utility assets were constructed by vertically integrated load-serving utilities at retail ratepayer expense. In many parts of the country today, entities other than vertically integrated load-serving utilities have expressed interest in building and owning electric storage assets of varying sizes. Suggested business models range from traditional cost-of-service rates to competing in wholesale commodity trading; some are considering the possibility of multiple revenue streams which may blend both cost-of-service recovery for some costs with other costs being at risk in competitive wholesale market Commission. 1 The statements herein do not necessarily reflect the views of the20100611-3032 FERC PDF (Unofficial) 06/11/2010

Washington D. C

2010-01-01T23:59:59.000Z

420

Protect Anadromous Salmonids in the Mainstem Corridor, Monitoring and Evaluation, Annual Report 200-2001.  

DOE Green Energy (OSTI)

In this annual Monitoring & Evaluation (M&E) report to the Bonneville Power Administration (BPA), we summarize significant activities and performance measures resultant from enhanced protection by Columbia River Inter-Tribal Fisheries Enforcement (CRITFE) in the mainstem corridor (BPA Project 2000-056). This report covers the Fiscal Year (FY) 2000 performance period -- May 15, 2000 to May 14, 2001. Quarterly progress reports have previously been submitted to BPA and are posted on the M&E Web site (www.Eco-Law.net) -- for the time period April-December 2000 (Vigg 2000b,c,d) and for the period January-June 2001 (Vigg 2001a,b). We also present comprehensive data representing the first quarter of year 2000 in this report for a pre-project comparison. In addition, we have analyzed specific annual enforcement statistics to evaluate trends during the baseline period 1996-2000. Additional statistics and more years of comprehensive baseline data are now being summarized, and will be presented in future M&E annual reports--to provide a longer time series for evaluation of trends in input, output and outcome performance standards.

Vigg, Steven; Johnson, John

2002-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Three essays concerning information transmission  

E-Print Network (OSTI)

Transmissionas an Information-Transmission Mechanism,” American EconomicConcerning Information Transmission A dissertation submitted

Boone, Johnathan

2010-01-01T23:59:59.000Z

422

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

423

(DOE/EIS-0285/SA-11): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1) 1) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Covington-Maple Valley No. 2 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 150 feet. The proposed work will be accomplished in selected sections along the entire transmission line corridor. Location: The ROW is located in King County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with

424

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-141- SalemAlbany #2)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1- SalemAlbany #2) 1- SalemAlbany #2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Salem Albany #2 115 kV transmission line from Salem Substation to Albany Substation. Location: The project is located in the BPA Eugene Region, within Marion, Polk, and Benton Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission

425

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-140- SalemAlbany1)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0- SalemAlbany1) 0- SalemAlbany1) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Salem Albany #1 115 kV transmission line from Salem Substation to Albany Substation. Location: The project is located in the BPA Eugene Region, Marion, Linn, and Benton County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission

426

(DOE/EIS-0285/SA-119): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/29/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2003 9, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Snohomish-Murray No. 1 Transmission Line from structure 2/6 through structure 18/6. Right of way width is 95 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will

427

(DOE/EIS-0285/SA-122): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CSB-2 CSB-2 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-122- Bonneville-Alcoa Ed Tompkins, TFO/LMT Proposed Action: Vegetation Management for the Bonneville-Alcoa 115kV transmission line Location: The project is located in the BPA Olympia Region in Skamania and Clark Counties, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans

428

(DOE/EIS-0285/SA=32): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (11/15/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 15, 2001 November 15, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-32) Bill Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Re-vegetation Plot Study along the Lower Monumental-McNary Transmission Line ROW. The study area sections are located near structures 38/4 and 39/3. The line is a 500kV Single Circuit Transmission Line having an easement width of 165 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as indicated on the attached checklist. Location: The ROW is located in Walla Walla County, WA being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

429

(DOE/EIS-0285/SA-57): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/10/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2002 0, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57) Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Trojan-Allston Transmission Lines 1 & 2 ROW between 1/1 and 9/1. The lines are 230 kV Single Circuit Transmission Lines having an easement width of 125 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

430

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20)(8/2/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2001 2, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20) Bill Erickson - TFP/Walla Walla - Natural Resource Specialist Jim Jellison - TFO/Olympia - Natural Resource Specialist Proposed Action: Vegetation Management along the McNary-Ross 161/1 to 166/5+346 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 175 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Clark County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

431

(DOE/EIS-0285-126): Supplement Analysis for the Transmission System Vegetation Management Program 2/19/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-4 KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-126- Alvey Fairview Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Alvey Fairview 230kV transmission line from structure 1/1 through structure 64/7. Location: The project is located in the BPA Eugene Region in Coos, Douglas, and Lane Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

432

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

433

A Geophysical Characterization & Monitoring Strategy for Determining Hydrologic Processes in the Hyporheic Corridor at the Hanford 300-Area  

SciTech Connect

The primary objective of this research was to advance the prediction of solute transport between the Uranium contaminated Hanford aquifer and the Columbia River at the Hanford 300 Area by improving understanding of how fluctuations in river stage, combined with subsurface heterogeneity, impart spatiotemporal complexity to solute exchange along the Columbia River corridor. Our work explored the use of continuous waterborne electrical imaging (CWEI), in conjunction with fiber-optic distributed temperature sensor (FO-DTS) and time-lapse resistivity monitoring, to improve the conceptual model for how groundwater/surface water exchange regulates uranium transport. We also investigated how resistivity and induced polarization can be used to generate spatially rich estimates of the variation in depth to the Hanford-Ringold (H-R) contact between the river and the 300 Area Integrated Field Research Challenge (IFRC) site. Inversion of the CWEI datasets (a data rich survey containing {approx}60,000 measurements) provided predictions of the distributions of electrical resistivity and polarizability, from which the spatial complexity of the primary hydrogeologic units along the river corridor was reconstructed. Variation in the depth to the interface between the overlying coarse-grained, high permeability Hanford Formation and the underlying finer-grained, less permeable Ringold Formation, an important contact that limits vertical migration of contaminants, has been resolved along {approx}3 km of the river corridor centered on the IFRC site in the Hanford 300 Area. Spatial variability in the thickness of the Hanford Formation captured in the CWEI datasets indicates that previous studies based on borehole projections and drive-point and multi-level sampling likely overestimate the contributing area for uranium exchange within the Columbia River at the Hanford 300 Area. Resistivity and induced polarization imaging between the river and the 300 Area IFRC further imaged spatial variability in the depth to the Hanford-Ringold inland over a critical region where borehole information is absent, identifying evidence for a continuous depression in the H-R contact between the IFRC and the river corridor. Strong natural contrasts in temperature and specific conductance of river water compared to groundwater at this site, along with periodic river stage fluctuations driven by dam operations, were exploited to yield new insights into the dynamics of groundwater-surface water interaction. Whereas FO-DTS datasets have provided meter-scale measurements of focused groundwater discharge at the riverbed along the corridor, continuous resistivity monitoring has non-invasively imaged spatiotemporal variation in the resistivity inland driven by river stage fluctuations. Time series and time-frequency analysis of FO-DTS and 3D resistivity datasets has provided insights into the role of forcing variables, primarily daily dam operations, in regulating the occurrence of focused exchange at the riverbed and its extension inland. High amplitudes in the DTS and 3D resistivity signals for long periods that dominate the stage time series identify regions along the corridor where stage-driven exchange is preferentially focused. Our work has demonstrated how time-series analysis of both time-lapse resistivity and DTS datasets, in conjunction with resistivity/IP imaging of lithology, can improve understanding of groundwater-surface water exchange along river corridors, offering unique opportunities to connect stage-driven groundwater discharge observed with DTS on the riverbed to stage-driven groundwater and solute fluctuations captured with resistivity inland.

Slater, Lee; Day-Lewis, Frederick; Lane, John; Versteeg, Roelof; Ward, Anderson; Binley, Andrew; Johnson, Timothy; Ntarlagiannis, Dimitrios

2011-08-31T23:59:59.000Z

434

Strategy for the Integration of Hydrogen as a Vehicle Fuel into the Existing Natural Gas Vehicle Fueling Infrastructure of the Interstate Clean Transportation Corridor Project: 22 April 2004--31 August 2005  

DOE Green Energy (OSTI)

Evaluates opportunities to integrate hydrogen into the fueling stations of the Interstate Clean Transportation Corridor--an existing network of LNG fueling stations in California and Nevada.

Gladstein, Neandross and Associates

2005-09-01T23:59:59.000Z

435

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

436

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

437

Arnold Schwarzenegger TRANSMISSION BENEFIT  

E-Print Network (OSTI)

California Edison's (SCE) initial Tehachapi transmission trunk-line proposal for integration of wind. The Tehachapi Transmission Project to integrate 4,500 MW of renewable wind energy has since been approved after

438

Transmission Investment Incentives  

Science Conference Proceedings (OSTI)

This report documents the use of agent-based simulation as a tool for studying transmission investment incentives, and it is meant to illuminate what accounts for the difficulties in aligning incentives for enhancing the transmission system. The report suggests that a new method of calculation for bid optimization be applied to the economic analysis of long-term incentives for transmission investment. This technology can be broadly applied to help negotiators in transmission planning quantify their count...

2006-12-21T23:59:59.000Z

439

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

cable transmission systems:5 two 500 kV circuits, a high-voltage direct current (HVDC) system and two to serve VI and the HVDC link is expected to be completely retired in 2007. This erosion in transmission / replacement of the HVDC cables (at a cost of $230 million), as well as transmission upgrades on the mainland

440

(DOE/EIS-0285-SA-104): Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Lynch Creek Tap to LaGrande-Cowlitz No.1 8/21/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 1, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-104-Lynch Creek Tap to LaGrande-Cowlitz No. 1 James A. Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management for the Lynch Creek to LaGrande-Cowlitz No. 1 Location: Near the town of Eatonville, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 29 miles of access roads and corridor will be treated. Vegetation management is required

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Definition: Transmission Service Provider | Open Energy Information  

Open Energy Info (EERE)

Transmission Service Provider The entity that administers the transmission tariff and provides Transmission Service to Transmission Customers under applicable...

442

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications 2013 Transmission Reliability Program Peer Review - Day 1...

443

Automated manual transmission controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

444

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

445

Final environment impact report supplement: Northeast corridor improvement project electrification: New Haven, CT to Boston, MA. Final report  

SciTech Connect

This document is a supplement to the final environmental impact report (FEIR) published in October 1994 on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electrification from New Haven, CT, to Boston, MA. The purpose of this supplement is to provide additional information relative to: the Roxbury Substation Alternative Analysis; an expanded discussion on mitigation of potential adverse impacts; draft Section 61 findings; the Memorandum of Understanding between Amtrak and the Massachusetts Bay Transportation Authority (MBTA) for Route 128 Station; Amtrak`s draft outreach program; and to address other Massachusetts Environmental Policy Act concerns.

NONE

1995-02-01T23:59:59.000Z

446

A First Preliminary Look: Are Corridor Charging Stations Used to Extend the Range of Electric Vehicles in The EV Project?  

Science Conference Proceedings (OSTI)

A preliminary analysis of data from The EV Project was performed to begin answering the question: are corridor charging stations used to extend the range of electric vehicles? Data analyzed were collected from Blink brand electric vehicle supply equipment (EVSE) units based in California, Washington, and Oregon. Analysis was performed on data logged between October 1, 2012 and January 1, 2013. It should be noted that as additional AC Level 2 EVSE and DC fast chargers are deployed, and as drivers become more familiar with the use of public charging infrastructure, future analysis may have dissimilar conclusions.

John Smart

2013-01-01T23:59:59.000Z

447

Notice of Intent for the Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota (5/27/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 16 Federal Register / Vol. 70, No. 102 / Friday, May 27, 2005 / Notices Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Note that also there is an ''eSubscription'' link on the web site that enables subscribers to receive e- mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659. Comment Date: June 9, 2005. Magalie R. Salas, Secretary. [FR Doc. E5-2702 Filed 5-26-05; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Western Area Power Administration Construction and Operation of the Proposed Big Stone II Power Plant and Transmission Project, South Dakota and Minnesota

448

REQUEST BY ALLISON TRANSMISSION FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN RIGHTS IN SUBJECT INVENTIONS MADE IN THE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ALLISON TRANSMISSION FOR AN ADVANCE WAIVER OF ALLISON TRANSMISSION FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN RIGHTS IN SUBJECT INVENTIONS MADE IN THE COURSE OF OR UNDER DEPARTMENT OF ENERGY COOPERATIVE AGREEMENT NO. DE-FC05-00OR22807; DOE WAIVER DOCKET W(A)-00-032 [ORO-758] Petitioner, Allison Transmission, has made a timely request for an advance waiver to worldwide rights in Subject Inventions made in the course of or under Department of Energy (DOE) Cooperative Agreement No. DE-FC05-00OR22807. Petitioner is a subcontractor to Electricore, the awardee of the above Cooperative Agreement. The scope of this work is to continue development of the E P System T M , alpha configuration in an articulated bus. This work is sponsored by the Office of Transportation Technologies, Office of Heavy Vehicle Technologies.

449

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

450

FY-09 Summary Report to the Office of Petroleum Reserves on the Western Energy Corridor Initiative Activities and Accomplishments  

Science Conference Proceedings (OSTI)

To meet its programmatic obligations under the Energy Policy Act of 2005, the Office of Naval Petroleum and Shale Oil Reserves (NPSOR) has initiated the Western Energy Corridor Initiative (WECI). The WECI will implement the Unconventional Strategic Fuels Task Force recommendations for accelerating and promoting the development of domestic unconventional fuels to help meet the nations’ energy needs. The mission of the WECI is to bolster America’s future fuel security by facilitating socially and environmentally responsible development of unconventional fuels resources in the Western Energy Corridor, using sound engineering principles and science-based methods to define and assess benefits, impacts, uncertainties, and mitigation options and to resolve impediments. The Task Force proposed a three-year program in its commercialization plan. The work described herein represents work performed by Idaho National Laboratory (INL) in support of the DOE’s WECI. This effort represents an interim phase of work, designed to initiate only select portions of the initiative, limited by available funding resources within NPOSR. Specifically, the work presented here addresses what was accomplished in FY-09 with the remaining carryover (~$420K) from NPOSR FY-08 funds. It was the intent of the NPOSR program to seek additional funding for full implementation of the full scope of work; however, the original tasks were reduced in scope, terminated, or eliminated (as noted below). An effort is ongoing to obtain funding to continue the tasks initiated under this project. This study will focus on the integrated development of multiple energy resources in a carbon-neutral and environmentally acceptable manner. Emphasis will be placed on analyses of the interrelationships of various energy-resource development plans and the infrastructure, employment, training, fiscal, and economic demands placed on the region as a result of various development scenarios. The interactions at build-out during the design, permitting, and construction of individual and multiple energy developments are not fully considered at the local, state, regional, or national levels. The net impacts to the Western Energy Corridor cannot be understood and the design optimized under the current approach. A regional development plan is needed to model cumulative impacts, determine the carrying capacity of the basin, and provide valuable technically based information to both skeptics and advocates. The INL scope of work for FY-09 involved six tasks: 1. Evaluation of the ASPEN Code as a dynamic systems model for application and use under the WECI and communications with Alberta Oil Sands Research Institutions as an “analog” resource development in the Western Energy Corridor 2. Application of the Aspen Plus computer model to several oil shale processes to consider energy balances and inputs and outputs (e.g. water consumption, CO2 production, etc.) 3. Development of a regulatory roadmap for oil shale developments 4. Defining of the physiographic extent of the natural resource reserves that comprise the Western Energy Corridor 5. A review of the Unconventional Fuels Task Force Report to Congress for ideas, concepts and recommendations that crosscutting plans 6. Program development with stakeholders, including industry, academics, state and federal agencies, and non government organizations. This task also includes project management, strategic development and reporting.

Thomas R. Wood

2010-01-01T23:59:59.000Z

451

Video Transmission Jerkiness Measure.  

E-Print Network (OSTI)

??Digital video transmission is widely used nowadays in multimedia. Frame dropping, freeze and reduced number of frames in the transmitted video are common symptoms of… (more)

Abdelsamad, Deena

2013-01-01T23:59:59.000Z

452

NIST Transmission SEM  

Science Conference Proceedings (OSTI)

... As a result, more electrons will scatter, to provide the ... RR Keller, "Transmission EBSD in the Scanning Electron Microscope," Microscopy Today vol. ...

2013-07-29T23:59:59.000Z

453

Patterns of transmission investment  

E-Print Network (OSTI)

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

454

2009 National Electric Transmission Congestion Study Notice of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No. 183 - Sep. 19, 2008 Application for presidential permit OE Docket No. PP-362 Champlain Hudson - Notice of Intent To Prepare an Environmental Impact Statement: Federal Register...

455

DOE/EIS-0285-SA-137: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Chemawa-Salem 1&2 (4/1/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7- Chemawa-Salem1&2) 7- Chemawa-Salem1&2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Chemawa-Salem #1 115 kV and #2 230 kV transmission lines from Chemawa Substation to Salem Substation. Location: The project is located in the BPA Eugene Region, Marion County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-

456

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2- KeelerOregon City #2) 2- KeelerOregon City #2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Keeler-Oregon City #2 115 kV transmission line from Keeler Substation to Oregon City Substation. Includes 5 miles of the St. Johns- Oregon City #2 69 kV transmission line. Location: The project is located in the BPA Eugene Region, Washington County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation via hand cutting along the right-of-way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with

457

EIS(DOE/EIS-0285/SA-61) Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/15/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 15, 2002 April 15, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-61 Tom Murphy - TFS/Bell-1 - Natural Resource Specialist Proposed Action: Vegetation Management along the Bell-Boundary No.3, 84/4 to 96/1 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 100 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Stevens and Pend Oreille County, WA, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-

458

The progressive transmission disadvantage  

Science Conference Proceedings (OSTI)

The disadvantage of progressive transmission, compared to transmission in a single step, is analyzed for the high-rate case using a polytope that is self-similar under binary subdivision. This disadvantage is calculated to be 0.3424 dB or 0.057 bit compared ...

M. J. Durst

1997-01-01T23:59:59.000Z

459

*Revisions to POS List, i.e. updates, additions and/or deletions EL SEGUNDO POWER PLANT REDEVELOPMENT PROJECT Docket No. 00-AFC-14  

E-Print Network (OSTI)

REDEVELOPMENT PROJECT Docket No. 00-AFC-14 1 STATE OF CALIFORNIA Energy Resources Conservation and Development Power Plant ) PROOF OF SERVICE LIST Redevelopment Project ) [*Revised 1 Segundo, CA 90245 Mhensley@bwslaw.com Michelle A. Murphy Robert E. Perkins 4420 The Strand Manhattan Beach

460

FOR ELECTRIC POWER TRANSMISSION  

E-Print Network (OSTI)

A contract network extends the concept of a contract path to address the problem of loop flow and congestion in electric power transmission systems. A contract network option provides a well defined, internally consistent framework for assigning long-term capacity rights to a complicated electric transmission network. The contract network respects the special conditions induced by Kirchoff's Laws; accommodates thermal, voltage and contingency constraints on transmission capacity; and can be adopted without disturbing existing methods for achieving an economic power dispatch subject to these constraints. By design, a contract network would maintain short-run efficiency through optimal spot price determination of transmission prices. Through payment of congestion rentals, the contract network makes a long-term capacityright holder indifferent between delivery of the power or receipt of payments in a settlement system. And the contract network framework can support allocation of transmission capacity rights through a competitive bidding process. CONTRACT NETWORKS

William W. Hogan; William W. Hogan

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Nonlinear magnetoinductive transmission lines  

E-Print Network (OSTI)

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent cap...

Lazarides, Nikos; Tsironis, G P

2011-01-01T23:59:59.000Z

462

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-07)  

Science Conference Proceedings (OSTI)

Vegetation Management on section of three ROWs. The ROWs include selected sections of the McNary Powerhouse, the present and proposed new sections of the McNary-Roundup and the McNary Switchyard South Transmission lines. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines. All work will be in accordance with the National Electrical Safety Code and BPA standards. See Section 1.1 of the attached checklist for pertinent information on each section of referenced transmission line. BPA would conduct the vegetation control with the goal of removing tall-growing vegetation that is currently or will soon be a hazard to the transmission lines and to promote low-growing plant communities in the right-of-way and to clear vegetation from new rights-of-way corridors. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

N /A

2001-04-18T23:59:59.000Z

463

Northeast Corridor improvement project draft environmental impact statement/report for electrification of Northwest Corridor, New Haven, CT. to Boston, MA. Volume 3. Technical appendices. Final report, September 1992-September 1993  

SciTech Connect

The impacts of extending electrification on the National Railroad Passenger Corporation's (Amtrak) Northeast Corridor (NEC) from New Haven, Connecticut to Boston, Massachusetts are of direct concern to the Federal Railroad Administration (FRA). To improve rail service and increase ridership between New York and Boston, Amtrak proposes the electrification of the NEC main line between New Haven, CT and Boston, MA using an overhead 2 x 25,000 volt - 60 hertz power system. The volume Number III contains the detailed technical studies that were performed in order to identify and evaluate the environmental impacts of the proposed project. Some of these studies have been included entirely in the Draft Environmental Impact Statements-draft (DEIS/R) (Volume 1). The technical evaluations performed were based upon regulatory requirements as well as substantive issues raised by individuals and public agencies as part of the public participation program.

Not Available

1993-09-01T23:59:59.000Z

464

Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee  

SciTech Connect

This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description of the affected environment; (2) Rare plants and vegetation assemblages; (3) Rare wildlife and their habitat; (4) Rare aquatic species; and (5) Wetlands/Floodplains. A summary of project actions taken or planned in order to avoid, minimize, or mitigate the environmental impacts associated with this project are summarized in the conclusion section of this report.

Peterson, M.J.

2005-12-20T23:59:59.000Z

465

Impact of Spatial Filtering on the Least Cost Path Method: Selecting a High-Speed Rail Route for Ohio's 3-C Corridor  

Science Conference Proceedings (OSTI)

In the face of renewed interest in High-Speed Rail (HSR) projects, Ohio is one of several states seeking federal funding to relieve pressure on aging, overburdened highway infrastructure by constructing passenger rail routes between major cities. This ... Keywords: 3-C Corridor, High-Speed Rail, Least Cost Path, Ohio Hub Project, Rail Routing

Amy E. Rock; Amanda Mullett; Saad Algharib; Jared Schaffer; Jay Lee

2010-10-01T23:59:59.000Z

466

Final environmental impact statement/report. Volume 4. Comment letters and public hearing transcripts. Northeast corridor improvement project electrication: New Haven, CT to Boston, MA  

Science Conference Proceedings (OSTI)

This document is the final environmental impact statement and final environmental impact report (FEIS/R) on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electric traction from New Haven, CT, to Boston, MA. This document (Volume IV) reprints the comments received on the DEIS/R.

NONE

1994-10-01T23:59:59.000Z

467

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Stephen Buzzell and Lelah Sullivan  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

468

Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from The Weeks Lancaster Trust  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S, - Canada Border.

469

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska  

Energy.gov (U.S. Department of Energy (DOE))

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S.- Canada Border.

470

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture  

Energy.gov (U.S. Department of Energy (DOE))

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada border.

471

Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska State Legislature, Peggy Wilson  

Energy.gov (U.S. Department of Energy (DOE))

Application from Soule Hydro to construct, operate and maintain electric transmission facilities at the U.S. - Canada border.

472

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

473

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

474

Down hole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

475

Designing electricity transmission auctions  

E-Print Network (OSTI)

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

476

Downhole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2008-01-15T23:59:59.000Z

477

Transmission Electron Microscopy (TEM)  

Science Conference Proceedings (OSTI)

...Transmission electron microcopy (TEM) has been used since the 1950s to obtain very high resolution images of microstructures. As TEMs were enhanced to include features such as digitally scanned point beams and energy dispersive x-ray detectors

478

Cloud Transmissivities for Canada  

Science Conference Proceedings (OSTI)

Transmissivities are determined for different cloud types using nine years of hourly irradiance measurements under overcast skies at six Canadian stations. Values for individual stations and for pooled data using irradiances uncorrected for ...

J. A. Davies; M. Abdel-Wahab; J. E. Howard

1985-03-01T23:59:59.000Z

479

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

480

Docket No. ER12--000, Request to Recover Prudently-Incurred Costs Associated with  

E-Print Network (OSTI)

Dear Secretary Bose: Pursuant to Section 205 of the Federal Power Act (FPA) 1 and Part 35 of the regulations of the Federal Energy Regulatory Commission (Commission), 2 Public Service Electric and Gas Company (PSE&G) hereby submits for filing revised tariff sheets to the Open Access Transmission Tariff (OATT) administered by PJM Interconnection, L.L.C. (PJM) modifying PSE&G’s existing cost-of-service formula rate (Formula Rate) to permit the recovery of prudently incurred costs associated with the abandonment of the Branchburg-Roseland-Hudson 500 kilovolt (kV) project (BRH Project or the Project). PSE&G respectfully requests that the Commission permit the revised tariff sheets to become effective in sixty (60) days (i.e., September 17, 2012) with no suspension period or hearing. 1

Law Department; Honorable Kimberly; D. Bose

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission corridor docket" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

482

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

483

Definition: Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Jump to: navigation, search Dictionary.png Transmission An interconnected group of lines and associated equipment for the movement or transfer of electric energy...

484

Interconnection Transmission Planning: Awards | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and...

485

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

ColoradoTransmissionAgencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary...

486

Electricity Transmission, A Primer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

487

DOE/EIS-0285-SA-50: Supplement Analysis for the Transmission Vegetation Management Program FEIS (3/15/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2/27/01 1 2/27/01 1 United States Government Department of Energy Bonneville Power Administration DATE: March 15, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-50) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Grizzly-Summerlake (Structures 102/1-104/2) and Grizzly-Captain Jack (Structures 103/1-140/4) Transmission Line Corridors. Location: The project area lies east and northeast Klamath Falls, OR, and is located in Lake and Klamath Counties, Redmond Region. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the rights of

488

(DOE/EIS-0285/SA-52): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (03/22/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2002 22, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-52) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on the Ashe-Marion #2 (138/1-150/2), Buckley- Marion (12/1-24/2), McNary-Santiam (109/1-119/3), and John Day-Marion (49/4-50/5) Transmission Line Corridors. Location: The project area lies between Maupin and Pine Grove Oregon, and is in the Redmond Region. The project area begins at on the Ashe-Marion at structure 138/1 and terminates at Wapinitia Road, Pine Grove. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the

489

DOE/EIS-0285-SA-136: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Oregon City-Chemawal 1&2 (4/1/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6- Oregon City-Chemawa1&2) 6- Oregon City-Chemawa1&2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Oregon City-Chemawa #1 and #2 115 kV transmission lines from Oregon City Substation to Chemawa Substation. Location: The project is located in the BPA Eugene Region, Washington and Marion Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that

490

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 129) Ashe-Marion #2 [Mile 150-157]  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 129 Ashe-Marion #2 [Mile 150-157] Elizabeth Johnson Natural Resource Specialist- TFR/The Dalles Proposed Action: Vegetation Management for the Ashe-Marion #2 500 kV transmission line from structure 150/2 through structure 157/7 (reference line). The Buckley-Marion #1 transmission line is also present within the proposed corridor. Right of way width averages 135 feet. Location: The project location is within Wasco County, Oregon near the city of Pine Grove, and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

491

(DOE/EIS-0285/SA-113-1): Supplement Analysis for the Transmission System Vegetation Management Program Updates 9/27/02 SA-113 12/2/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12/02/02 12/02/02 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program (DOE/EIS-0285/SA-113-1) Updates 9/27/02 SA-113 Bill Erickson, TFP/Walla Walla Natural Resource Specialist Proposed Action: To perform remedial vegetation management for keeping vegetation a safe distance away from electric power facilities and controlling noxious weeds within a section of BPA's Big Eddy-Ostrander Transmission Corridor. During a site review conducted in late fall of 2001, the inspector observed various species of hardwood trees resprouted from stumps. The new vegetative growth encroached on the required "Minimum Safe Distance" between the top of vegetation and the conductor cables. The management action is necessary to reduce the current and potential future hazards that tall- growing vegetation poses to transmission

492

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-149-Captain Jack-Malin #1)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2003 8, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-149-Captain Jack-Malin #1) Elizabeth Johnson Natural Resource Specialist - TFR/The Dalles Proposed Action: Vegetation Management for the Captain Jack-Malin #1 500 kV transmission line from structure 2/4 to Malin Substation (reference line). Right of way width averages 150 feet. Location: The project location is within Klamath County, Oregon near the city of Malin, and is within the Redmond Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors.

493

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

494

Sent: Thu Aug 12 21:00:36 2010 Subject: RIN: 1904-AC13 Docket: EE-RM/STD-02-112  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sent: Thu Aug 12 21:00:36 2010 Sent: Thu Aug 12 21:00:36 2010 Subject: RIN: 1904-AC13 Docket: EE-RM/STD-02-112 Mr. Nasseri, Please find the comments of the Natural Resources Defense Council on Energy Efficiency and Sustainable Design Standards for New Federal Buildings attached for the docket. We are also resubmitting the comments we wrote for the Interim Final Rule on the Energy Efficiency Standard for Federal Buildings, which were submitted on January 30, 2007, as Annex A to our new comments. Thank you for the opportunity to comment, Christine Chang Christine Chang | Legal Fellow | Natural Resources Defense Council Phone: 212.727.4431 Fax: 212.727.1773 | 40 West 20th Street, New York, NY 10011

495

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

496

NREL: Energy Analysis: Transmission Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

497

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

498

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

499

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission lines between two adjacent periodic intersections to be longer than the other. 5 figs.

Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; deGrassie, J.S.

1990-03-02T23:59:59.000Z

500

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices