Sample records for transmission corridor designations

  1. DOE Affirms National Interest Electric Transmission Corridor Designations |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations March 6, 2008 - 11:54am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today denied requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as areas of significant electricity congestion and constraint.

  2. DOE Issues Two Draft National Interest Electric Transmission Corridor Designations

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the issuance of two draft National Interest Electric Transmission Corridor (National Corridor) designations. The Energy Policy Act of 2005 authorizes the Secretary, based on the findings of DOE's National Electric Transmission Congestion Study (Congestion Study), to designate National Corridors.

  3. DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability Kevin M. Kolevar today announced the Department's designation of two National Interest Electric Transmission Corridors (National Corridors) -- the Mid-Atlantic Area National Interest Electric Transmission Corridor, and the Southwest Area National Interest Electric Transmission Corridor. These corridors include areas in two of the Nation's most populous regions with growing electricity congestion problems. The Department based its designations on data and analysis showing that persistent transmission congestion exists in these two areas.

  4. DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability Kevin M. Kolevar today announced the Department's designation of two National...

  5. Southwest Area Corridor Map | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interest Electric Transmission Corridors October 2, 2007 FACT SHEET: Designation of National Interest Electric Transmission Corridors,As Authorized by the Energy Policy Act of 2005

  6. Department of Energy Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors

    Broader source: Energy.gov [DOE]

    The Department has decided that, prior to issuing a report that designates any national interest electric transmission corridor, the Department will first issue any designation that it is considering in draft form, so as to allow additional opportunities for review and comment by affected States, regional entities, and the general public.

  7. DOE Affirms National Interest Electric Transmission Corridor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    data analysis conducted in its 2006 National Interest Electric Transmission study, ... DOE also highlighted that its approach to defining the geographic boundaries of the ...

  8. EIS-0406: Designation of Energy Corridors on Federal Land in 39 States

    Broader source: Energy.gov [DOE]

    DOE has canceled this EIS, which was to evaluate the environmental impacts of the designation, under Section 368(b) of the Energy Policy Act of 2005, of energy corridors on federal lands in 39 nonwestern states. The corridors, which were to be jointly identified by the Secretaries of Agriculture, Commerce, Defense, Energy, and the Interior, might have been used for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities.

  9. From: Carl Daffron To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Carl Daffron To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors Date: Monday, September 22, 2014 12:47:15 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undue burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. Second, I believe that

  10. From: Carol Johnson To: Congestion Study Comments Subject: Re: National Interest Energy Transmission Corridors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Johnson To: Congestion Study Comments Subject: Re: National Interest Energy Transmission Corridors Date: Sunday, October 19, 2014 8:20:41 AM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undo burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. I am a landowner in the path

  11. From: Noralie Crow To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors (NIETC)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Noralie Crow To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors (NIETC) Date: Monday, September 22, 2014 6:50:56 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undo burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. Second, I believe

  12. MidAtlantic_Corridor_Map091707.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MidAtlantic_Corridor_Map091707.pdf MidAtlantic_Corridor_Map091707.pdf (1.64 MB) More Documents & Publications DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors October 2, 2007 FACT SHEET: Designation of National Interest Electric Transmission Corridors,As Authorized by the Energy Policy Act of 2005

  13. Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in the West to help address growing energy demand while protecting the environment.

  14. EIS-0386: Designation of Energy Corridors on Federal Land in Western States

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EIS analyzes DOE's decision to designatate corridors on Federal land in the eleven Western States for oil, gas and hydrogen pipelines and electricity transmission and distribution facilities.

  15. From: Austin Bird To: Congestion Study Comments Subject: Citizen Comment: National Interest Energy Transmission Corridors (NIETC"s)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Austin Bird To: Congestion Study Comments Subject: Citizen Comment: National Interest Energy Transmission Corridors (NIETC"s) Date: Monday, October 06, 2014 10:00:01 AM To Whomever It May Concern; I am writing in support of the establishment of National Interest Energy Transmission Corridors (NIETCs). The establishment of these corridors would further the progress of the budding alternative energy sector in the Midwest, particularly in my state, Iowa. I am a resident of Davenport, Iowa, and

  16. From: Alex Free To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    05:34 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undo burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. Second, I believe that condemning private property for transmission lines in one state to transport electricity to another is a violation of property rights

  17. From: Alex Free To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10:45 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undo burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. Second, I believe that condemning private property for transmission lines in one state to transport electricity to another is a violation of property rights

  18. DOE Announces Additional Public Comment Meetings for Draft National Corridor Designations

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) today announced that it will hold four additional public meetings for the two draft National Interest Electric Transmission Corridors (National Corridors) during the 60-day public comment period, which will close on July 6, 2007.

  19. From: Martin Meyer To: Congestion Study Comments Subject: National Interest Electric Transmission Corridors (NIETC"s)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Martin Meyer To: Congestion Study Comments Subject: National Interest Electric Transmission Corridors (NIETC"s) Date: Friday, September 19, 2014 2:10:18 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. Current public easements already exist. ROW for transportation and easements for other publically regulated utilities could be made to cooperate on placement of their infrastructure within these existing routes before

  20. Proposed Energy Transport Corridors: West-wide energy corridor programmatic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS, Draft Corridors - September 2007. | Department of Energy Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Map of the area covered by a programmatic environmental impact statement (PEIS), "Designation of Energy Corridors on Federal Land in the 11 Western States" (DOE/EIS-0386) to address the

  1. Department of Energy Seeks Public Comment on Designation of Energy Corridors in the West

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announced that it and several other federal agencies will host eleven public meetings to discuss the designation of multi-purpose energy corridors on federal lands in the western United States.

  2. Microsoft Word - Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FOR IMMEDIATE RELEASE: Jill Moran, BLM (202) 452-5068 Wednesday, November 26, 2008 Bethany Shively, DOE (202) 586-4940 Joe Walsh, USFS (202) 205-1134 Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The Department of

  3. Integrated survey and design for transmission lines

    SciTech Connect (OSTI)

    Miller, M.A.; Simpson, K.D.

    1994-12-31

    Gathering and compiling information on the features and uses of the land within a proposed corridor provides the basis for selecting a route, obtaining easements, and designing and constructing a transmission line. Traditionally, gathering this information involved searches of existing maps and records to obtain the available information, which would then be supplemented with aerial photography to record current conditions. Ground surveys were performed to collect topographic data for design purposes. This information was manually transferred to drawings and other documents to show the terrain, environmentally sensitive areas, property ownership, and existing facilities. These drawing served as the base to which the transmission line right-of-way, structures, and other design information were added. As the design was completed, these drawings became the source of information for constructing the line and ultimately, the record of the facility. New technologies and the every growing need for instantly accessible information have resulted in changes in almost every step of gathering, storing and using information. Electronic data collection, global positioning systems (GPS), digitized terrain models, computerized design techniques, development of drawings using CAD, and graphical information systems (GIS) have individually resulted in significant advancements in this process. Combining these components into an integrated system, however, is truly revolutionizing transmission line engineering. This paper gives an overview of the survey and mapping information that is required for transmission line projects, review the traditional techniques that have been employed to obtain and utilize this information, and discuss the recent advances in the technology. Additionally, a system is presented that integrates the components in this process to achieve efficiency, minimize chances of errors, and provide improved access to project information.

  4. A survey of endangered waterbirds on Maui and Oahu and assessment of potential impacts to waterbirds from the proposed Hawaii Geothermal Project transmission corridor. Final report

    SciTech Connect (OSTI)

    Evans, K.; Woodside, D.; Bruegmann, M.

    1994-08-01

    A survey of endangered waterbirds on Maui and Oahu was conducted during August and September 1993 to identify potential waterbird habitats within the general area of the proposed Hawaii Geothermal Project transmission corridor and to assess the potential impacts to endangered waterbird of installing and operating a high voltage transmission line from the Island of Hawaii to the islands of Oahu and Maui. Annual waterbird survey information and other literature containing information on specific wetland sites were summarized. Literature describing impacts of overhead transmission lines on birds was used to evaluate potential impacts of the proposed project on endangered waterbirds, resident wading birds, and migratory shorebirds and waterfowl. On Oahu, five wetland habitats supporting endangered Hawaiian waterbirds were identified within 2.5 miles of the proposed transmission line corridor. On Maui, three wetland habitats supporting endangered Hawaiian waterbirds were identified within the general area of the proposed transmission line corridor. Several of the wetlands identified on Oahu and Maui also supported resident wading birds and migratory shorebirds and waterfowl. Endangered waterbirds, resident wading birds, and migratory birds may collide with the proposed transmission lines wires. The frequency and numbers of bird collisions is expected to be greater on Oahu than on Maui because more wetland habitat exists and greater numbers of birds occur in the project area on Oahu. In addition, the endangered Hawaiian goose and the endangered Hawaiian petrel may be impacted by the proposed segment of the Hawaii Geothermal Project transmission line on Maui.

  5. Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council

    SciTech Connect (OSTI)

    Kuiper, James A.; Cantwell, Brian J.; Hlava, Kevin J.; Moore, H Robert; Orr, Andrew B.; Zvolanek, Emily A.

    2014-02-24

    analyze the proposed energy corridors in the WECC report in five topic areas: Federal land jurisdiction, Existing Section 368 corridors, Existing transmission lines, Previously studied corridor locations, and Protected areas. Analysis methods are explained and tables and maps are provided to describe the results of the analyses in all five topic areas. WECC used a rational approach to connecting the hubs it identified, although there may be opportunities for adapting some of the proposed WECC routes to previously designated Section 368 corridors, for example: The WECC proposed energy corridors are in fact centerlines of proposed routes connecting hubs of various descriptions related to electric energy transmission. Although the centerlines were sited to avoid sensitive areas, infrastructure proposed within actual pathways or corridors defined by the centerlines would sometimes affect lands where such development would not normally be allowed, such as National Parks and Monuments, National Wildlife Refuges, and Wilderness Areas. Many WECC proposed energy corridors are sited along centerlines of existing roads, including Interstate Highways, where in some cases additional width to accommodate energy transmission infrastructure may not be available. Examples include the WECC Proposed Corridor along Interstate 70 through Glenwood Canyon in Colorado, and along U.S. Highway 89 across Glen Canyon Dam in Arizona. Several WECC proposed energy corridors are parallel to designated Section 368 corridors that have already cleared the preliminary steps to right-of-way approval. In many of these cases, the WECC hub connection objectives can be met more efficiently by routing on the designated Section 368 corridors.

  6. Energy Corridors on Federal Lands

    Office of Energy Efficiency and Renewable Energy (EERE)

    To improve energy delivery and enhance the electric transmission grid for the future, several government agencies currently are working together to establish a coordinated network of Federal energy corridors on Federal lands throughout the United States.

  7. Proposed Energy Transport Corridors: West-wide energy corridor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Proposed Energy Transport Corridors: West-wide energy corridor ...

  8. Hawaii Geothermal Project annotated bibliography: Biological resources of the geothermal subzones, the transmission corridors and the Puna District, Island of Hawaii

    SciTech Connect (OSTI)

    Miller, S.E.; Burgett, J.M.

    1993-10-01

    Task 1 of the Hawaii Geothermal Project Interagency Agreement between the Fish and Wildlife Service and the Department of Energy-Oak Ridge National Laboratory (DOE) includes an annotated bibliography of published and unpublished documents that cover biological issues related to the lowland rain forest in Puna, adjacent areas, transmission corridors, and in the proposed Hawaii Geothermal Project (HGP). The 51 documents reviewed in this report cover the main body of biological information for these projects. The full table of contents and bibliography for each document is included along with two copies (as requested in the Interagency Agreement) of the biological sections of each document. The documents are reviewed in five main categories: (1) geothermal subzones (29 documents); (2) transmission cable routes (8 documents); (3) commercial satellite launching facility (Spaceport; 1 document); (4) manganese nodule processing facility (2 documents); (5) water resource development (1 document); and (6) ecosystem stability and introduced species (11 documents).

  9. River Corridor - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    River Corridor Richland Operations Office Richland Operations Office River Corridor B Reactor 300 Area 324 Building 618-10 and 618-11 Burial Grounds C Reactor D and DR Reactors F ...

  10. River Corridor Achievements

    Broader source: Energy.gov [DOE]

    Washington Closure Hanford and previous contractors have completed much of the cleanup work in the River Corridor, shown here.

  11. The design, construction, and operation of long-distance high-voltage electricity transmission technologies.

    SciTech Connect (OSTI)

    Molburg, J. C.; Kavicky, J. A.; Picel, K. C.

    2008-03-03

    This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these

  12. Agencies Publish Final Environmental Impact Statement on Energy Corridor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Designation in the West | Department of Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 2:07pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The

  13. Agencies Publish Final Environmental Impact Statement on Energy Corridor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Designation in the West | Department of Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 4:58pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The

  14. PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES

    Broader source: Energy.gov [DOE]

    Designed to promote energy efficiency in buildings in Phoenix, Arizona’s 10-mile-long Light Rail Corridor, Energize Phoenix focused on performing energy upgrades and reducing energy use in...

  15. RAPID/BulkTransmission/About | Open Energy Information

    Open Energy Info (EERE)

    Current Topics in Bulk Transmission West-Wide Energy Corridor Programmatic Environmental Impact Statement The West-Wide Energy Corridor Programmatic Environmental Impact Statement...

  16. I-5 Corridor Reinforcement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Damper Replacement Program Wind Projects I-5 Corridor Reinforcement Current project schedule and activities BPA now expects to release our final EIS early in 2016, followed...

  17. 2009 Electric Transmission Congestion Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in

  18. Idaho - IC 61-516 - Priority Designation for Electric Transmission...

    Open Energy Info (EERE)

    Idaho - IC 61-516 - Priority Designation for Electric Transmission Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation:...

  19. National Electric Transmission Congestion Studies

    Office of Energy Efficiency and Renewable Energy (EERE)

    Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to include in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmission capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor).

  20. HVDC power transmission electrode siting and design

    SciTech Connect (OSTI)

    Holt, R.J.; Dabkowski, J.; Hauth, R.L.

    1997-04-01

    This research strives to shed light on the feasibility and practicality of using deep earth electrodes to permit their use for extended periods without adverse consequences. This report begins with a review of the fundamentals associated with current conduction in earth, including the various techniques available for measuring the earth`s electrical properties. The sources of existing data are discussed and some specific data for selected regions of the U.S. and Canada are reviewed as examples. Electrode technology and design issues are reviewed and recent experience gained by New England Power and Hydro-Quebec is discussed. The issues associated with direct current flowing in underground pipelines (and other facilities) are described and the present-day mitigation measures are evaluated. Suggestions are made for further R&D in the coordination of cathodic protection systems, an area that has evolved as an empirical, trial- and-error art more than a science.

  1. Conductor design for the VLHC transmission line magnet

    SciTech Connect (OSTI)

    Foster, G.W.; Kashikhin, V.; McAshan, M.; Mazur, P.O.; Piekarz, H.; Volk, J.T.; Walker, R.

    1999-03-01

    The transmission line magnet [1] is under development for the Very Large Hadron Collider (VLHC) at Fermilab with the expectation that it’s cost will be several times less (per Tesla-meter) than conventional superconducting magnets. It is a dual-aperture warm-iron superferric magnet built around an 80kA superconducting transmission line. The superconductor consists of 8 Rutherford (SSC Outer) cables in an Invar pipe jacket. The conductor design requirements and development program is described. A 100kA conductor test facility based on inductive coupling is described.

  2. Energy transport corridors: the potential role of Federal lands in states identified by the Energy Policy Act of 2005, section 368(b).

    SciTech Connect (OSTI)

    Krummel, J.; Hlohowskyj, I.; Kuiper, J.; Kolpa, R.; Moore, R.; May, J.; VanKuiken, J.C.; Kavicky, J.A.; McLamore, M.R.; Shamsuddin, S.

    2011-09-01

    On August 8, 2005, the President signed the Energy Policy Act of 2005 (EPAct) into law. In Subtitle F of EPAct, Congress set forth various provisions that would change the way certain federal agencies (Agencies) coordinate to authorize the use of land for a variety of energy-related purposes. As part of Subtitle F of EPAct, Section 368 addresses the issue of energy transportation corridors on federal land for oil, gas, and hydrogen pipelines, as well as electricity transmission and distribution facilities. Because of the critical importance of improving the nation's electrical transmission grid, Congress recognized that electricity transmission issues should receive added attention when the Agencies address corridor location and analysis issues. In Section 368, Congress specifically directed the Agencies to consider the need for upgraded and new facilities to deliver electricity: In carrying out [Section 368], the Secretaries shall take into account the need for upgraded and new electricity transmission and distribution facilities to (1) improve reliability; (2) relieve congestion; and (3) enhance capability of the national grid to deliver electricity. Section 368 does not require the Agencies to consider or approve specific projects, applications for rights-of-way (ROWs), or other permits within designated energy corridors. Importantly, Section 368 does not direct, license, or otherwise permit any on-the-ground activity of any sort. If an applicant is interested in obtaining an authorization to develop a project within any corridor designated under Section 368, the applicant would have to apply for a ROW authorization and applicable permits. The Agencies would consider each application by applying appropriate project-specific reviews under requirements of laws and related regulations, including, but not limited to, the National Environmental Policy Act (NEPA), the Clean Water Act, the Clean Air Act, Section 7 of the Endangered Species Act (ESA), and Section 106 of

  3. West Vero Corridor, Florida: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. West Vero Corridor is a census-designated place in Indian River County, Florida.1...

  4. Long Island Smart Energy Corridor

    SciTech Connect (OSTI)

    Mui, Ming

    2015-02-04

    The Long Island Power Authority (LIPA) has teamed with Stony Brook University (Stony Brook or SBU) and Farmingdale State College (Farmingdale or FSC), two branches of the State University of New York (SUNY), to create a “Smart Energy Corridor.” The project, located along the Route 110 business corridor on Long Island, New York, demonstrated the integration of a suite of Smart Grid technologies from substations to end-use loads. The Smart Energy Corridor Project included the following key features: -TECHNOLOGY: Demonstrated a full range of smart energy technologies, including substations and distribution feeder automation, fiber and radio communications backbone, advanced metering infrastructure (AM”), meter data management (MDM) system (which LIPA implemented outside of this project), field tools automation, customer-level energy management including automated energy management systems, and integration with distributed generation and plug-in hybrid electric vehicles. -MARKETING: A rigorous market test that identified customer response to an alternative time-of-use pricing plan and varying levels of information and analytical support. -CYBER SECURITY: Tested cyber security vulnerabilities in Smart Grid hardware, network, and application layers. Developed recommendations for policies, procedures, and technical controls to prevent or foil cyber-attacks and to harden the Smart Grid infrastructure. -RELIABILITY: Leveraged new Smart Grid-enabled data to increase system efficiency and reliability. Developed enhanced load forecasting, phase balancing, and voltage control techniques designed to work hand-in-hand with the Smart Grid technologies. -OUTREACH: Implemented public outreach and educational initiatives that were linked directly to the demonstration of Smart Grid technologies, tools, techniques, and system configurations. This included creation of full-scale operating models demonstrating application of Smart Grid technologies in business and residential

  5. Energy Transport Corridor Draft Environmental Impact Statement Available

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Review | Department of Energy Transport Corridor Draft Environmental Impact Statement Available for Review Energy Transport Corridor Draft Environmental Impact Statement Available for Review August 1, 2008 - 3:08pm Addthis The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense are anticipating a summer release of a Final Programmatic Environmental Impact Statement (PEIS) proposing designation of energy

  6. Concurrent Wind Cooling in Power Transmission Lines

    SciTech Connect (OSTI)

    Jake P Gentle

    2012-08-01

    Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

  7. Congestion Study Designations 2006: FAQ | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Congestion Study Designations 2006: FAQ Congestion Study Designations 2006: FAQ U.S. Department of Energy: National Electric Transmission Congestion Study and Designation of National Corridors Frequently Asked Questions, August 8, 2006 Congestion Study Designations FAQ (43.47 KB) More Documents & Publications Proceedings of the March 29, 2006 Conference for the 2006 National Electric Transmission Congestion Study - Session 1 Proceedings of the March 29, 2006 Conference for the 2006 National

  8. Western Energy Corridor -- Energy Resource Report

    SciTech Connect (OSTI)

    Leslie Roberts; Michael Hagood

    2011-06-01

    The world is facing significant growth in energy demand over the next several decades. Strategic in meeting this demand are the world-class energy resources concentrated along the Rocky Mountains and northern plains in Canada and the U.S., informally referred to as the Western Energy Corridor (WEC). The fossil energy resources in this region are rivaled only in a very few places in the world, and the proven uranium reserves are among the world's largest. Also concentrated in this region are renewable resources contributing to wind power, hydro power, bioenergy, geothermal energy, and solar energy. Substantial existing and planned energy infrastructure, including refineries, pipelines, electrical transmission lines, and rail lines provide access to these resources.

  9. HANFORD SITE RIVER CORRIDOR CLEANUP

    SciTech Connect (OSTI)

    BAZZELL, K.D.

    2006-02-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

  10. Transmission Considerations for Market Operation: U.S. Design (Presentation)

    SciTech Connect (OSTI)

    Ela, E.

    2011-06-01

    Presented at the Utility Wind Integration Group (UWIG) Workshop on Market Design and Operation With Variable Renewables, 22 June 2011, Fredericia, Denmark. This presentation provides an overview of the present U.S. electricity market, how it operates, and some solutions for improving its operation, cost accounting, and integration of renewable power resources.

  11. Alternative Fuels Data Center: West Virginia CNG Corridor Now Open

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    West Virginia CNG Corridor Now Open to someone by E-mail Share Alternative Fuels Data Center: West Virginia CNG Corridor Now Open on Facebook Tweet about Alternative Fuels Data Center: West Virginia CNG Corridor Now Open on Twitter Bookmark Alternative Fuels Data Center: West Virginia CNG Corridor Now Open on Google Bookmark Alternative Fuels Data Center: West Virginia CNG Corridor Now Open on Delicious Rank Alternative Fuels Data Center: West Virginia CNG Corridor Now Open on Digg Find More

  12. Transmission Line Security Monitor: Final Report

    SciTech Connect (OSTI)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  13. Design of Flexure-based Precision Transmission Mechanisms using Screw Theory

    SciTech Connect (OSTI)

    Hopkins, J B; Panas, R M

    2011-02-07

    This paper enables the synthesis of flexure-based transmission mechanisms that possess multiple decoupled inputs and outputs of any type (e.g. rotations, translations, and/or screw motions), which are linked by designer-specified transmission ratios. A comprehensive library of geometric shapes is utilized from which every feasible concept that possesses the desired transmission characteristics may be rapidly conceptualized and compared before an optimal concept is selected. These geometric shapes represent the rigorous mathematics of screw theory and uniquely link a body's desired motions to the flexible constraints that enable those motions. This paper's impact is most significant to the design of nano-positioners, microscopy stages, optical mounts, and sensors. A flexure-based microscopy stage was designed, fabricated, and tested to demonstrate the utility of the theory.

  14. Department of Energy Awards Hanford River Corridor Contract To...

    Energy Savers [EERE]

    Hanford River Corridor Contract To Washington Closure, LLC Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis ...

  15. Milford Wind Corridor Phase I (GE Energy) | Open Energy Information

    Open Energy Info (EERE)

    I (GE Energy) Jump to: navigation, search Name Milford Wind Corridor Phase I (GE Energy) Facility Milford Wind Corridor Phase I (GE Energy) Sector Wind energy Facility Type...

  16. Milford Wind Corridor Phase II | Open Energy Information

    Open Energy Info (EERE)

    II Jump to: navigation, search Name Milford Wind Corridor Phase II Facility Milford Wind Corridor Phase II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  17. Milford Wind Corridor Phase I (Clipper) Wind Farm | Open Energy...

    Open Energy Info (EERE)

    Clipper) Wind Farm Jump to: navigation, search Name Milford Wind Corridor Phase I (Clipper) Wind Farm Facility Milford Wind Corridor Phase I (Clipper) Sector Wind energy Facility...

  18. Design Considerations of Fast-cycling Synchrotrons Based on Superconducting Transmission Line Magnets

    SciTech Connect (OSTI)

    Piekarz, H.; Hays, S.; Huang, Y.; Shiltsev, V.; /Fermilab

    2008-06-01

    Fast-cycling synchrotrons are key instruments for accelerator based nuclear and high-energy physics programs. We explore a possibility to construct fast-cycling synchrotrons by using super-ferric, {approx}2 Tesla B-field dipole magnets powered with a superconducting transmission line. We outline both the low temperature (LTS) and the high temperature (HTS) superconductor design options and consider dynamic power losses for an accelerator with operation cycle of 0.5 Hz. We also briefly outline possible power supply system for such accelerator, and discuss the quench protection system for the magnet string powered by a transmission line conductor.

  19. Magnet Lattice Design for the Transmission of Power Using Particle Beams

    SciTech Connect (OSTI)

    Marley, Daniel; /North Carolina State U. /SLAC

    2012-08-24

    As the amount of electricity generated by renewable energy sources continues to increase, the current method of power transmission will not serve as an adequate method for transmitting power over very long distances. A new method for transmitting power is proposed using particle beams in a storage ring. Particle beams offer an incredibly energy efficient alternative to transmission lines in transmitting power over very long distances. A thorough investigation of the magnet lattice design for this storage ring is presented. The design demonstrates the ability to design a ring with stable orbits over a 381.733 km circumference. Double bend achromats and FODO cells are implemented to achieve appropriate {beta} functions and dispersion functions for 9-11 GeV electron beams.

  20. Washington Closure Hanford: Ten Years of River Corridor Cleanup |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Washington Closure Hanford: Ten Years of River Corridor Cleanup Washington Closure Hanford: Ten Years of River Corridor Cleanup December 17, 2015 - 12:30pm Addthis Contract-Timeline-E1511010_4-B_756px.jpg This timeline shows contractor Washington Closure Hanford's accomplishments over the past 10 years through its River Corridor Closure Contract. Addthis Related Articles EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site River Corridor Achievements

  1. An Inside Look at River Corridor

    Broader source: Energy.gov [DOE]

    In the seventh chapter of The Handford Story, the Energy Department takes a look at the River Corridor -- a 50-mile stretch of the Columbia River that flows through the Hanford site in southeast...

  2. Investigation of conductor swinging by wind and its application for design of compact transmission line

    SciTech Connect (OSTI)

    Tsujimoto, K.; Fujii, K.; Kubokawa, H.; Okomura, T.; Simojima, K.; Yoshioka, V.

    1982-11-01

    In Japan it has recently become necessary to shorten the interphase spacing in overhead transmission lines because of land limitations and economical considerations. In this connection, the authors have attempted to analyze, in-depth, the possibilities of shortened interphase spacing via conductor swinging caused by wind effects: one of the important factors in the design of more compact overhead lines. This paper describes not only the investigative results of conductor swinging that were obtained both through computer simulation and in 3 years of full scale field line testing, but also design methodology for compact overhead lines based on these results.

  3. Trends In U.S. Electric Power Transmission

    SciTech Connect (OSTI)

    NONE

    2007-11-15

    The report provides an overview of the changes that are occurring in the industry to implement the goals of improved reliability and reduced congestion costs. As the electric industry works to become a more efficient market, transmission stands as a key link between the competitive generation and the regulated distribution sectors. In this role as a key link, transmission is a major focus of government efforts to improve reliability and reduce congestion costs. The scope of the report is to analyze the dominant reliability, investment, siting, and competition/open access trends that are occurring in the domestic electric transmission industry. Topics covered include: the impact of the 2003 Northeast blackout on reliability rules; the move from voluntary to mandatory reliability standards; the advent of real-time transmission system monitoring; ISO/RTO efforts to improve system reliability; the drivers of government intervention in transmission investment; the move towards incentive-based rates for transmission investment; legislative and regulatory efforts to spur transmission investment to support renewable energy resources; the emergence of merchant transmission; the need for federal backstop authority on regional transmission projects; the designation of national interest electric transmission corridors; FERC Orders on siting transmission; the need for changes in open access and competition regulations; FERC efforts to increase open access and competition; legislative efforts to increase competition; and, current competitive issues in the industry.

  4. Interstate Clean Transportation Corridor Project Under Way

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    rucks that travel in the western United States will soon be able to operate clean-burning alternative fuel vehicles (AFVs) along the Interstate Clean Transpor- tation Corridor (ICTC). The ICTC project is the first effort to develop clean transportation corridors to connect Los Angeles, San Bernar- dino, the San Joaquin Valley, Sacra- mento/San Francisco, Salt Lake City, Reno, and Las Vegas along routes 1-15, 1-80, and 1-5/CA-99. The ICTC team, headed by California- based Gladstein and

  5. Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Surpasses 1 Million Gallons Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons to someone by E-mail Share Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Facebook Tweet about Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Twitter Bookmark Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Google Bookmark Alternative

  6. EIA - Natural Gas Pipeline Network - Natural Gas Transportation Corridors

    U.S. Energy Information Administration (EIA) Indexed Site

    Map Corridors > Major U.S. Natural Gas Transportation Corridors Map About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Major U.S. Natural Gas Transportation Corridors, 2008

  7. An Optimal Deployment of Wireless Charging Lane for Electric Vehicles on Highway Corridors

    SciTech Connect (OSTI)

    Huang, Yongxi

    2016-01-01

    We propose an integrated modeling framework to optimally locate wireless charging facilities along a highway corridor to provide sufficient in-motion charging. The integrated model consists of a master, Infrastructure Planning Model that determines best locations with integrated two sub-models that explicitly capture energy consumption and charging and the interactions between electric vehicle and wireless charging technologies, geometrics of highway corridors, speed, and auxiliary system. The model is implemented in an illustrative case study of a highway corridor of Interstate 5 in Oregon. We found that the cost of establishing the charging lane is sensitive and increases with the speed to achieve. Through sensitivity analyses, we gain better understanding on the extent of impacts of geometric characteristics of highways and battery capacity on the charging lane design.

  8. Site mitigation issues along the Alameda Corridor

    SciTech Connect (OSTI)

    Ripaldi, C.P.

    1996-12-31

    The Alameda Corridor is a consolidated railroad link between the Ports of Los Angeles and Long Beach and the regional and national rail systems linking the nation. A joint Environmental Impacts Report/Environmental Impact Statement (EIR/EIS) was prepared for the project. The Final EIS was issued in February 1996, and a record of decision was issued in May, 1996. Various Phase 1 and Phase 2 Environmental Site Assessments have provided extensive historical documentation of environmental contamination in the vicinity of the Alameda Corridor Transportation Project. A Site Mitigation Master Plan provides guidance and direction for the clean-up activities. Samples will be analyzed for metals, PCB`s TRPH, BTEX, and VOCs.

  9. Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor Presentation from the 2015 DOE National Cleanup Workshop by Scott Sax, President, Washington Closure Hanford. Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor (10.41 MB) More Documents & Publications 2014 Congressional Nuclear Cleanup Caucus Briefings 2013 Congressional Nuclear Cleanup

  10. Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    $300 Million | Department of Energy Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million December 17, 2015 - 12:35pm Addthis A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. RICHLAND, Wash. - The River Corridor Closure

  11. Department of Energy Awards Hanford River Corridor Contract To...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inc., Bechtel National Inc., CH2M Hill Inc., Eberline Services Inc., and Integrated Logistics Services Inc. The Columbia River Corridor is composed of roughly 210 square miles...

  12. Vermont Flood Hazard Area and River Corridor General Permit Applicatio...

    Open Energy Info (EERE)

    the developer should provide a map generated from the ANR Natural Resources Atlas showing the river corridor and flood hazard area; A written description of the...

  13. PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES | Department...

    Energy Savers [EERE]

    in Phoenix, Arizona's 10-mile-long Light Rail Corridor, Energize Phoenix focused on performing energy upgrades and reducing energy use in commercial and residential spaces. ...

  14. River Corridor Baseline Risk Assessment (RCBRA) Human Health...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12, 2011 River Corridor Baseline Risk Assessment (RCBRA) Human Health Risk Assessment (Volume 2) * RCBRA Human Health Risk Assessment is final - Response provided to HAB ...

  15. Design and performance of the Z magnetically-insulated transmission lines

    SciTech Connect (OSTI)

    Stygar, W.A.; Spielman, R.B.; Allshouse, G.O.

    1997-08-01

    The 36-module Z accelerator was designed to drive z-pinch loads for weapon-physics and inertial-confinement-fusion experiments, and to serve as a testing facility for pulsed-power research required to develop higher-current drivers. The authors have designed and tested a 10-nH 1.5-m-radius vacuum section for the Z accelerator. The vacuum section consists of four vacuum flares, four conical 1.3-m-radius magnetically-insulated transmission lines, a 7.6-cm-radius 12-post double-post-hole convolute which connects the four outer MITLs in parallel, and a 5-cm-long inner MITL which connects the output of the convolute to a z-pinch load. IVORY and ELECTRO calculations were performed to minimize the inductance of the vacuum flares with the constraint that there be no significant electron emission from the insulator-stack grading rings. Iterative TLCODE calculations were performed to minimize the inductance of the outer MITLs with the constraint that the MITL electron-flow-current fraction be {le} 7% at peak current. The TLCODE simulations assume a 2.5 cm/{micro}s MITL-cathode-plasma expansion velocity. The design limits the electron dose to the outer-MITL anodes to 50 J/g to prevent the formation of an anode plasma. The TLCODE results were confirmed by SCREAMER, TRIFL, TWOQUICK, IVORY, and LASNEX simulations. For the TLCODE, SCREAMER, and TRIFL calculations, the authors assume that after magnetic insulation is established, the electron-flow current launched in the outer MITLs is lost at the convolute. This assumption has been validated by 3-D QUICKSILVER simulations for load impedances {le} 0.36 ohms. LASNEX calculations suggest that ohmic resistance of the pinch and conduction-current-induced energy loss to the MITL electrodes can be neglected in Z power-flow modeling that is accurate to first order. To date, the Z vacuum section has been tested on 100 shots. They have demonstrated they can deliver a 100-ns rise-time 20-MA current pulse to the baseline z-pinch load.

  16. Transmission | Open Energy Information

    Open Energy Info (EERE)

    Energy Corridor Programmatic EIS The West-wide Energy Corridor Programmatic Environmental Impact Statement (PEIS) evaluates potential impacts associated with the proposed action to...

  17. Requirements Definition for ORNL Trusted Corridors Project

    SciTech Connect (OSTI)

    Walker, Randy M; Hill, David E; Smith, Cyrus M; DeNap, Frank A; White, James D; Gross, Ian G; Gorman, Bryan L; Hively, Lee M; Abercrombie, Robert K

    2008-02-01

    The ORNL Trusted Corridors Project has several other names: SensorNet Transportation Pilot; Identification and Monitoring of Radiation (in commerce) Shipments (IMR(ic)S); and Southeastern Transportation Corridor Pilot (SETCP). The project involves acquisition and analysis of transportation data at two mobile and three fixed inspection stations in five states (Kentucky, Mississippi, South Carolina, Tennessee, and Washington DC). Collaborators include the State Police organizations that are responsible for highway safety, law enforcement, and incident response. The three states with fixed weigh-station deployments (KY, SC, TN) are interested in coordination of this effort for highway safety, law enforcement, and sorting/targeting/interdiction of potentially non-compliant vehicles/persons/cargo. The Domestic Nuclear Detection Office (DNDO) in the U.S. Department of Homeland Security (DHS) is interested in these deployments, as a Pilot test (SETCP) to identify Improvised Nuclear Devices (INDs) in highway transport. However, the level of DNDO integration among these state deployments is presently uncertain. Moreover, DHS issues are considered secondary by the states, which perceive this work as an opportunity to leverage these (new) dual-use technologies for state needs. In addition, present experience shows that radiation detectors alone cannot detect DHS-identified IND threats. Continued SETCP success depends on the level of integration of current state/local police operations with the new DHS task of detecting IND threats, in addition to emergency preparedness and homeland security. This document describes the enabling components for continued SETCP development and success, including: sensors and their use at existing deployments (Section 1); personnel training (Section 2); concept of operations (Section 3); knowledge discovery from the copious data (Section 4); smart data collection, integration and database development, advanced algorithms for multiple sensors, and

  18. ARM - Field Campaign - 1999 Northeast Corridor Ozone & Particulate Study

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Northeast Corridor Ozone & Particulate Study ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : 1999 Northeast Corridor Ozone & Particulate Study 1999.07.23 - 1999.08.11 Lead Scientist : Larry Kleinman For data sets, see below. Abstract As part of the 1999 NARSTO Northeast Corridor Oxidant and Particulate Study (NEC-OPS) field campaign, the DOE G-1 aircraft sampled trace gases and aerosols in and

  19. H.R.S. 277 - Energy Corridors | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: H.R.S. 277 - Energy CorridorsLegal Abstract This statute outlines the law pertaining to...

  20. I-65 Clean Corridor: Fall Drive Overview and Media Summary

    Broader source: Energy.gov [DOE]

    At the May 1, 2008 joint quarterly Web conference of DOE's Biomass and Clean Cities programs, Julie Howe (Indiana Office of Energy & Defense Development) described the I-65 Corridor Project.

  1. Voluntary Protection Program Onsite Review, River Corridor Closure...

    Broader source: Energy.gov (indexed) [DOE]

    Evaluation to determine whether River Corridor Closure Project is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during June 11...

  2. Proceedings of the March 29, 2006 Conference for the 2006 National Electric Transmission Congestion Study- Session 2

    Broader source: Energy.gov [DOE]

    A public technical conference on the 2006 congestion study and criteria for designating National Interest Electric Tranmission Corridors was held on March 29, 2006.

  3. Proceedings of the March 29, 2006 Conference for the 2006 National Electric Transmission Congestion Study- Session 1

    Broader source: Energy.gov [DOE]

    A public technical conference on the 2006 congestion study and criteria for designating National Interest Electric Tranmission Corridors was held on March 29, 2006. 

  4. Proceedings of the March 29, 2006 Conference for the 2006 National Electric Transmission Congestion Study- Session 3

    Broader source: Energy.gov [DOE]

    A public technical conference on the 2006 congestion study and criteria for designating National Interest Electric Tranmission Corridors was held on March 29, 2006.

  5. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  6. RIVER CORRIDOR BUILDINGS 324 & 327 CLEANUP

    SciTech Connect (OSTI)

    BAZZELL, K.D.; SMITH, B.A.

    2006-02-09

    A major challenge in the recently awarded River Corridor Closure (RCC) Contract at the U.S. Department of Energy's (DOE) Hanford Site is decontaminating and demolishing (D&D) facilities in the 300 Area. Located along the banks of the Columbia River about one mile north of Richland, Washington, the 2.5 km{sup 2} (1 mi{sup 2})300 Area comprises only a small part of the 1517 km{sup 2} (586 mi{sup 2}) Hanford Site. However, with more than 300 facilities ranging from clean to highly contaminated, D&D of those facilities represents a major challenge for Washington Closure Hanford (WCH), which manages the new RCC Project for DOE's Richland Operations Office (RL). A complicating factor for this work is the continued use of nearly a dozen facilities by the DOE's Pacific Northwest National Laboratory (PNNL). Most of the buildings will not be released to WCH until at least 2009--four years into the seven-year, $1.9 billion RCC Contract. The challenge will be to deactivate, decommission, decontaminate and demolish (D4) highly contaminated buildings, such as 324 and 327, without interrupting PNNL's operations in adjacent facilities. This paper focuses on the challenges associated with the D4 of the 324 Building and the 327 Building.

  7. PSERC Webinar Series: Issues in Designing the Future Grid- Transmission Design at the National Level- January 24, 2012

    Broader source: Energy.gov [DOE]

    PSERC is offering a free, public webinar series from January to May 2012 entitled “Issues in Designing the Future Grid,” focusing on the information hierarchy for the future grid and grid enablers...

  8. Assessment of Critical Events Corridors through Multivariate Cascading Outages Analysis

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Samaan, Nader A.; Diao, Ruisheng; Kumbale, Murali; Chen, Yousu; Singh, Ruchi; Green, Irina; Morgan, Mark P.

    2011-10-17

    Massive blackouts of electrical power systems in North America over the past decade has focused increasing attention upon ways to identify and simulate network events that may potentially lead to widespread network collapse. This paper summarizes a method to simulate power-system vulnerability to cascading failures to a supplied set of initiating events synonymously termed as Extreme Events. The implemented simulation method is currently confined to simulating steady state power-system response to a set of extreme events. The outlined method of simulation is meant to augment and provide a new insight into bulk power transmission network planning that at present remains mainly confined to maintaining power system security for single and double component outages under a number of projected future network operating conditions. Although one of the aims of this paper is to demonstrate the feasibility of simulating network vulnerability to cascading outages, a more important goal has been to determine vulnerable parts of the network that may potentially be strengthened in practice so as to mitigate system susceptibility to cascading failures. This paper proposes to demonstrate a systematic approach to analyze extreme events and identify vulnerable system elements that may be contributing to cascading outages. The hypothesis of critical events corridors is proposed to represent repeating sequential outages that can occur in the system for multiple initiating events. The new concept helps to identify system reinforcements that planners could engineer in order to 'break' the critical events sequences and therefore lessen the likelihood of cascading outages. This hypothesis has been successfully validated with a California power system model.

  9. Research and Design of a Sample Heater for Beam Line 6-2c Transmission X-ray Microscope

    SciTech Connect (OSTI)

    Policht, Veronica; /Loyola U., Chicago /SLAC

    2012-08-27

    There exists a need for environmental control of samples to be imaged by the Transmission X-Ray Microscope (TXM) at the SSRLs Beam Line 6-2c. In order to observe heat-driven chemical or morphological changes that normally occur in situ, microscopes require an additional component that effectively heats a given sample without heating any of the microscope elements. The confinement of the heat and other concerns about the heaters integrity limit which type of heater is appropriate for the TXM. The bulk of this research project entails researching different heating methods used previously in microscopes, but also in other industrial applications, with the goal of determining the best-fitting method, and finally in designing a preliminary sample heater.

  10. File:03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf | Open...

    Open Energy Info (EERE)

    HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Jump to: navigation, search File File history File usage Metadata File:03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Size of...

  11. EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – In this issue of the EM Update newsletter, EM marks the many accomplishments the Richland Operations Office and its contractors have achieved in cleanup along the Columbia River corridor at the Hanford Site. This year marked the 10th anniversary of the River Corridor Closure Contract, the nation’s largest environmental cleanup closure project, managed by Washington Closure Hanford. The work has involved projects to clean up existing contamination and waste sites near the river, preventing contamination from reaching it, and cocooning or demolishing hundreds of structures no longer in use, including former reactors along the river that helped create materials for the U.S. nuclear weapons program.

  12. Workers Demolish Reactor Support Facility as Part of River Corridor

    Office of Environmental Management (EM)

    Contract | Department of Energy Demolish Reactor Support Facility as Part of River Corridor Contract Workers Demolish Reactor Support Facility as Part of River Corridor Contract July 3, 2014 - 12:00pm Addthis The site of the former 183-B Clearwell, an old water treatment facility for the historic B Reactor. The site of the former 183-B Clearwell, an old water treatment facility for the historic B Reactor. An aerial view of the site of the former 183-B Clearwell. An aerial view of the site of

  13. Contractors Cleaned Up Most of Hanford Site's River Corridor, But Work Remains

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – Washington Closure Hanford and previous contractors have completed much of the cleanup work in the River Corridor.

  14. Cleaning Up the Hanford River Corridor and Improving Site Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jon Peschong, Deputy Assistant Manager for the River and Plateau, Department of Energy Richland Operations Office September 2014 2 Richland Cleanup Priorities * Maintain safe, secure and compliant activities, facilities and operations * Continue River Corridor cleanup, including remediation of 618-10 Burial Ground * Continue Plutonium Finishing Plant deactivation, decommissioning and demolition * Continue groundwater pump and treat operations, and implement additional groundwater remedies 3

  15. Cleaning Up the Hanford River Corridor and Improving Site Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stacy Charboneau, Assistant Manager for Safety and Environment, Department of Energy Richland Operations Office June 2014 2 Richland Cleanup Priorities * Maintain safe, secure and compliant activities, facilities and operations * Continue River Corridor cleanup, including remediation of 618-10 Burial Ground * Continue Plutonium Finishing Plant deactivation, decommissioning and demolition * Continue groundwater pump and treat operations, and implement additional groundwater remedies 3 Richland

  16. Low-altitude remote sensing dataset of DEM and RGB mosaic for AB corridor on July 13 2013 and L2 corridor on July 21 2013

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Baptiste Dafflon

    2015-04-07

    Low-altitude remote sensing dataset including DEM and RGB mosaic for AB (July 13 2013) and L2 corridor (July 21 2013)

  17. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  18. RCC Contract DE-AC06-05RL14655 Attachment J-1: River Corridor Closure Contract Work Scope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract DE-AC06-05RL14655 Attachment J-1: River Corridor Closure Contract Work Scope Section J 593 TABLE B2 LINE ITEM a HANFORD AREA DESIGNATION b OPERABLE UNIT DESIGNATION c WCH WBS LEVEL 6 DESCRIPTION d WCH WBS LEVEL 6 IDENTIFICATION NUMBER e ACTIVITY DESIGNATION f ACTIVITY DESCRIPTION g ASSUMED ACTIVITY STATUS h ACTIVITIES WITH DELAYED RELEASE i SPIF SCOPE j EXPLANATION OF SPIF EXCEPTIONS k ATTACHMENT J-1 LEGEND Column Heading Descriptions: e - WCH WBS NUMBER - Unique number that identifies

  19. 2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    SciTech Connect (OSTI)

    West, W. J.; Lucas, J. G.; Gano, K. A.

    2011-11-14

    This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractors revegetation and mitigation areas on the Hanford Site.

  20. 2010 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    SciTech Connect (OSTI)

    C. T. Lindsey, A. L. Johnson

    2010-09-30

    This report documents eh status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with CERLA cleanup of National Priorities List waste sites at Hanford. This report contains vegetation monitoring data that were collected in the spring and summer of 2010 from the River Corridor Closure Contract’s revegetation and mitigation areas on the Hanford Site.

  1. Early environmental planning: A process for power line corridor selection

    SciTech Connect (OSTI)

    Haagenstad, T.; Bare, C.M.

    1998-12-01

    Los Alamos National Laboratory (LANL) conducted an environmental planning study in the fall of 1997 to help determine the best alternative for upgrading the Laboratory`s electrical power system. Alternatives considered included an on-site power generation facility and two corridors for a 10-mile-long 115-kV power line. This planning process was conducted prior to the formal National Environmental Policy Act (NEPA) review. The goals were to help select the best proposed action, to recommend modifications and mitigation measures for each alternative for a more environmentally sound project, and to avoid potential delays once the formal Department of Energy review process began. Significant constraints existed from a planning perspective, including operational issues such as existing outdoor high explosives testing areas, as well as environmental issues including threatened and endangered species habitats, multiple archeological sites, contaminated areas, and aesthetics. The study had to be completed within 45 days to meet project schedule needs. The process resulted in a number of important recommendations. While the construction and operation of the on-site power generation facility could have minimal environmental impacts, the need for a new air quality permit would create severe cost and schedule constraints for the project. From an environmental perspective, construction and operation of a power line within either corridor was concluded to be a viable alternative. However, impacts with either corridor would have to be reduced through specific recommended alignment modifications and mitigation measures.

  2. Landscape corridors can increase invasion by an exotic species and reduce diversity of native species.

    SciTech Connect (OSTI)

    Resasco, Julian; et al,

    2014-04-01

    Abstract. Landscape corridors are commonly used to mitigate negative effects of habitat fragmentation, but concerns persist that they may facilitate the spread of invasive species. In a replicated landscape experiment of open habitat, we measured effects of corridors on the invasive fire ant, Solenopsis invicta, and native ants. Fire ants have two social forms: polygyne, which tend to disperse poorly but establish at high densities, and monogyne, which disperse widely but establish at lower densities. In landscapes dominated by polygyne fire ants, fire ant abundance was higher and native ant diversity was lower in habitat patches connected by corridors than in unconnected patches. Conversely, in landscapes dominated by monogyne fire ants, connectivity had no influence on fire ant abundance and native ant diversity. Polygyne fire ants dominated recently created landscapes, suggesting that these corridor effects may be transient. Our results suggest that corridors can facilitate invasion and they highlight the importance of considering species traits when assessing corridor utility.

  3. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: DWP Summary, Volume 1

    SciTech Connect (OSTI)

    Project Integration

    2005-09-26

    This detailed work plan provides the scope, cost, and schedule for the Fiscal Year 2006 activities required to support River Corridor cleanup objectives within the directed guidance.

  4. Voluntary Protection Program Onsite Review, River Corridor Closure Project- June 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    Evaluation to determine whether River Corridor Closure Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  5. Privatization contractor transfer/feed line corridor obstructions

    SciTech Connect (OSTI)

    Parazin, R.J.

    1998-05-20

    One of the issues that came out of the Tank Waste Remediation System (TWRS) Privatization Interface Control Document (ICD) effort was the need to identify below grade obstructions that exist where the TWRS Privatization Phase 1 transfer/feed corridors pass through the former Grout complex (ICD Issue 9C). Due to the numerous phases of construction at the complex, and the lack of consolidated facility configuration drawings, as-built (or as-recorded) information on the area is difficult to find, let alone decipher. To resolve the issue, this study was commissioned to identify and consolidate the as-recorded information available (drawings and Engineering Change Notices, ECNS).

  6. Series Transmission Line Transformer

    DOE Patents [OSTI]

    Buckles, Robert A.; Booth, Rex; Yen, Boris T.

    2004-06-29

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  7. Low-altitude remote sensing dataset of DEM and RGB mosaic for AB corridor on July 13 2013 and L2 corridor on July 21 2013

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Baptiste Dafflon

    2015-04-07

    Low-altitude remote sensing dataset including DEM and RGB mosaic for AB (July 13 2013) and L2 corridor (July 21 2013).Processing flowchart for each corridor:Ground control points (GCP, 20.3 cm square white targets, every 20 m) surveyed with RTK GPS. Acquisition of RGB pictures using a Kite-based platform. Structure from Motion based reconstruction using hundreds of pictures and GCP coordinates. Export of DEM and RGB mosaic in geotiff format (NAD 83, 2012 geoid, UTM zone 4 north) with pixel resolution of about 2 cm, and x,y,z accuracy in centimeter range (less than 10 cm). High-accuracy and high-resolution inside GCPs zone for L2 corridor (500x20m), AB corridor (500x40) DEM will be updated once all GCPs will be measured. Only zones between GCPs are accurate although all the mosaic is provided.

  8. Design of polarizers for a mega-watt long-pulse millimeter-wave transmission line on the large helical device

    SciTech Connect (OSTI)

    Ii, T. Kubo, S.; Shimozuma, T.; Kobayashi, S.; Okada, K.; Yoshimura, Y.; Igami, H.; Takahashi, H.; Ito, S.; Mizuno, Y.; Okada, K.; Mutoh, T.; Makino, R.; Kobayashi, K.; Goto, Y.

    2015-02-15

    The polarizer is one of the critical components in a high-power millimeter-wave transmission line. It requires full and highly efficient coverage of any polarization states, high-power tolerance, and low-loss feature. Polarizers with rounded shape at the edge of the periodic groove surface are designed and fabricated by the machining process for a mega-watt long-pulse millimeter-wave transmission line of the electron cyclotron resonance heating system in the large helical device. The groove shape of λ/8- and λ/4-type polarizers for an 82.7 GHz transmission line is optimally designed in an integral method developed in the vector theories of diffraction gratings so that the efficiency to realize any polarization state can be maximized. The dependence of the polarization states on the combination of the two polarizer rotation angles (Φ{sub λ/8}, Φ{sub λ/4}) is examined experimentally in a low-power test with the newly developed polarization monitor. The results show that the measured polarization characteristics are in good agreement with the calculated ones.

  9. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

    1991-08-27

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

  10. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; DeGrassie, John S.

    1991-01-01

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

  11. Electric Transmission System Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System ... Can we agree on several key design attributes for the future grid? Taking Action in the ...

  12. Transmission SEAB Presentation

    Broader source: Energy.gov (indexed) [DOE]

    "05 * Nine Agency MOU - Oct. 2009 * Transmission Cabinet * Designated 7 Pilot Projects DOD CEQ FERC USDA DOE ACHP EPA DOI DOC RRTT Pilot Projects RRTT Rapid Response Team for ...

  13. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    SciTech Connect (OSTI)

    Walker, Randy M; Gross, Ian G; Smith, Cyrus M; Hill, David E

    2011-11-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor

  14. Strategy for the Identification of an INL Comprehensive Utility Corridor

    SciTech Connect (OSTI)

    John Reisenauer

    2011-05-01

    This report documents the strategy developed to identify a comprehensive utility corridor (CUC) on the Idaho National Laboratory (INL) Site. The strategy established the process for which the Campus Development Office will evaluate land management issues. It is a process that uses geographical information system geospatial technology to layer critical INL mission information in a way that thorough evaluations can be conducted and strategies developed. The objective of the CUC Project was to develop a process that could be implemented to identify potential utility corridor options for consideration. The process had to take into account all the missions occurring on the INL and other land-related issues. The process for developing a CUC strategy consists of the following four basic elements using geographical information system capabilities: 1. Development of an INL base layer map; this base layer map geospatially references all stationary geographical features on INL and sitewide information. 2. Development of current and future mission land-use need maps; this involved working with each directorate to identify current mission land use needs and future land use needs that project 30 years into the future. 3. Development of restricted and potential constraint maps; this included geospatially mapping areas such as wells, contaminated areas, firing ranges, cultural areas, ecological areas, hunting areas, easement, and grazing areas. 4. Development of state highway and power line rights of way map; this included geospatially mapping rights-of-way along existing state highways and power lines running through the INL that support INL operations. It was determined after completing and evaluating the geospatial information that the area with the least impact to INL missions was around the perimeter of the INL Site. Option 1, in this document, identifies this perimeter; however, it does not mean the entire perimeter is viable. Many places along the perimeter corridor cannot

  15. Optimal experimental design for the detection of light atoms from high-resolution scanning transmission electron microscopy images

    SciTech Connect (OSTI)

    Gonnissen, J.; De Backer, A.; Martinez, G. T.; Van Aert, S.; Dekker, A. J. den; Rosenauer, A.; Sijbers, J.

    2014-08-11

    We report an innovative method to explore the optimal experimental settings to detect light atoms from scanning transmission electron microscopy (STEM) images. Since light elements play a key role in many technologically important materials, such as lithium-battery devices or hydrogen storage applications, much effort has been made to optimize the STEM technique in order to detect light elements. Therefore, classical performance criteria, such as contrast or signal-to-noise ratio, are often discussed hereby aiming at improvements of the direct visual interpretability. However, when images are interpreted quantitatively, one needs an alternative criterion, which we derive based on statistical detection theory. Using realistic simulations of technologically important materials, we demonstrate the benefits of the proposed method and compare the results with existing approaches.

  16. Transmission Reliability | Department of Energy

    Office of Environmental Management (EM)

    ... Research focuses on five key areas: market design, long-term supply and transmission investment, renewable integration, demand response, and environmental impacts. Researchers use ...

  17. Transmission Workshop

    Broader source: Energy.gov [DOE]

    On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC.

  18. Transmission Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Grid Tech Team U.S. Department of Energy DOE Grid Tech Team (GTT) The Grid Tech Team ... regional diversity, AC-DC transmission and distribution solutions, ...

  19. Energy Corridors on Federal Lands | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    To improve energy delivery and enhance the electric transmission grid for the future, ... infrastructure and to take actions to improve reliability, relieve congestion, and ...

  20. I-65, America's First BioFuels Corridor: Timeline and Map

    Office of Energy Efficiency and Renewable Energy (EERE)

    At the May 1, 2008 joint quarterly Web conference of DOE's Biomass and Clean Cities programs, Julie Howe (Indiana Office of Energy & Defense Development) described the I-65 Corridor Project.

  1. Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC U.S. Energy Secretary Samuel Bodman today announced that Washington Closure, LLC has been awarded the contract to manage the clean up and remediation of the Columbia River Corridor...

  2. Transmission decisions

    SciTech Connect (OSTI)

    Ellison, C.T. )

    1993-03-01

    As the US FERC moves forward to implement the transmission access provisions of the National Energy Policy Act of 1992, the debate over Regional Transmission Groups continues. Independent energy producers have much at stake in this debate and their reaction to the general RTG concept and to specific RTG proposals will weigh heavily in determining the fate of these proposals.

  3. Microsoft PowerPoint - Columbia_River_Corridor_Rev_2_v2.ppt [Compatibility Mode]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Columbia River Corridor The Columbia River Corridor projects selected for Recovery A t f di i l d d li hi f iliti di ti Act funding include demolishing facilities, remediating waste sites, and containing and treating contamination in groundwater. The projects support completing cleanup along the Columbia River and shrinking the active area of cleanup to the center of the Hanford Site (the Central Plateau) by 2015 1 of the Hanford Site (the Central Plateau) by 2015. May 2009 Shrinking the

  4. FY-09 Summary Report to the Office of Petroleum Reserves on the Western Energy Corridor Initiative Activities and Accomplishments

    SciTech Connect (OSTI)

    Thomas R. Wood

    2010-01-01

    To meet its programmatic obligations under the Energy Policy Act of 2005, the Office of Naval Petroleum and Shale Oil Reserves (NPSOR) has initiated the Western Energy Corridor Initiative (WECI). The WECI will implement the Unconventional Strategic Fuels Task Force recommendations for accelerating and promoting the development of domestic unconventional fuels to help meet the nations’ energy needs. The mission of the WECI is to bolster America’s future fuel security by facilitating socially and environmentally responsible development of unconventional fuels resources in the Western Energy Corridor, using sound engineering principles and science-based methods to define and assess benefits, impacts, uncertainties, and mitigation options and to resolve impediments. The Task Force proposed a three-year program in its commercialization plan. The work described herein represents work performed by Idaho National Laboratory (INL) in support of the DOE’s WECI. This effort represents an interim phase of work, designed to initiate only select portions of the initiative, limited by available funding resources within NPOSR. Specifically, the work presented here addresses what was accomplished in FY-09 with the remaining carryover (~$420K) from NPOSR FY-08 funds. It was the intent of the NPOSR program to seek additional funding for full implementation of the full scope of work; however, the original tasks were reduced in scope, terminated, or eliminated (as noted below). An effort is ongoing to obtain funding to continue the tasks initiated under this project. This study will focus on the integrated development of multiple energy resources in a carbon-neutral and environmentally acceptable manner. Emphasis will be placed on analyses of the interrelationships of various energy-resource development plans and the infrastructure, employment, training, fiscal, and economic demands placed on the region as a result of various development scenarios. The interactions at build

  5. Analyzing the Deployment of Large Amounts of Offshore Wind to Design an Offshore Transmission Grid in the United States: Preprint

    SciTech Connect (OSTI)

    Ibanez, E.; Mai, T.; Coles, L.

    2012-09-01

    This paper revisits the results from the U.S. Department of Energy's '20% Wind Energy By 2030' study, which envisioned that 54 GW of offshore wind would be installed by said year. The analysis is conducted using the Regional Energy Deployment System (ReEDS), a capacity expansion model developed by the National Renewable Energy Laboratory. The model is used to optimize the deployment of the 54 GW of wind capacity along the coasts and lakes of the United States. The graphical representation of the results through maps will be used to provide a qualitative description for planning and designing an offshore grid. ReEDS takes into account many factors in the process of siting offshore wind capacity, such as the quality of the resource, capital and O&M costs, interconnection costs, or variability metrics (wind capacity value, forecast error, expected curtailment). The effect of these metrics in the deployment of offshore wind will be analyzed through examples in the results.

  6. EIS-0436: I-5 Corridor Reinforcement Project; Multnomah County...

    Office of Environmental Management (EM)

    proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation...

  7. EIS-0436: I-5 Corridor Reinforcement Project; Multnomah County...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon. ...

  8. Placing power linres : GIS helps site energy corridors.

    SciTech Connect (OSTI)

    Kuiper, J. A.; Cantwell, B.; Hlohowskyj, I.; Moore, H. R.

    2011-08-01

    Turn the lights on when you enter a room, then turn the lights off when you leave. Most of us repeat this sequence many times each day, and never give it another thought. But that seemingly simple light switch on the wall connects us to one of the most complex systems in the world: the electrical grid. Most of the United States is served by a highly reliable and adequate supply of electrical power, which is distributed through a grid of thousands of miles of electricity-transmission lines. However, as the electricity-supply infrastructure ages and consumer demand for electricity grows, the capacity to deliver electrical power hasn't kept pace with demand, and upgrading the electrical-transmission grid has become a more pressing need. From 1988-1998, demand for transmission grew by 30 percent while transmission grew by only 15 percent. From 1999-2009, demand grew by 20 percent and transmission by only 3 percent Despite a short-term decline related to the economic downturn and improved efficiency, U.S. energy consumption is expected to increase by 14 percent between 2008 and 2035. This growth will drive the need to develop viable routes for new transmission lines. Because transmission lines extend over large distances, they typically cross many federal, tribal, state, local and private land jurisdictions, each with a complex and varying set of siting issues and land-management practices. And as the existing grid needs improvement to meet growing demand, the U.S. is rapidly developing renewable energy sources, particularly solar and wind energy, often in areas far removed from existing electricity-transmission infrastructure and energy-consumption areas.

  9. Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01

    Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

  10. Transmission Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Services BPA Clarifications on the DSO216 1 Document updated on 2242015 at 3:29:25 PM B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Clarifications on...

  11. Transmission Planning

    Broader source: Energy.gov [DOE]

    The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security.

  12. Digging Begins at Hazardous Hanford Burial Ground- River Corridor Contractor Spent Two Years Preparing to Remediate 618-10

    Office of Energy Efficiency and Renewable Energy (EERE)

    RICHLAND, WASH. — After careful preparation and characterization, the Department of Energy’s (DOE) River Corridor contractor, Washington Closure Hanford, has begun remediation of one of the most hazardous burial grounds tackled to date on the Hanford Site’s River Corridor.

  13. Transmission line capital costs

    SciTech Connect (OSTI)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  14. McNary-John Day Transmission Line Project Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-03-08

    Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

  15. Lessons Learned during Creation of the I-65 Biofuels Corridor (White Paper)

    SciTech Connect (OSTI)

    Not Available

    2009-06-01

    A team of Clean Cities coalitions and state agencies worked together to create a biofuels corridor along I-65 between Indiana and Alabama. The team built relationships with stakeholders and learned the value of strong partnerships, good communication, marketing, and preparation.

  16. Small passenger car transmission test: Chevrolet Luv transmission

    SciTech Connect (OSTI)

    Bujold, M.P.

    1980-06-01

    The small passenger car transmission test was initiated to supply electric vehicle manufacturers with technical information regarding the performance of commercially available transmissions. This information would enable EV manufacturers to design a more energy efficient vehicle. With this information the manufacturers would be able to estimate vehicle driving range as well as speed and torque requirements for specific roadload performance characteristics. This report covers the 1978 Chevrolet Luv Truck manual transmission. This transmission was tested per a passenger car automatic transmission test code (SAE J65lb) which required drive performance, coast performance, and no load test conditions. The portion of the test code which involved the throttle valve modulation and line pressure were deleted since they did not apply to the manual transmission. Under these test conditions the transmission attained maximum efficiencies in the upper 90% range at rated load for both drive performance tests and coast performance tests. The major results of this test are the torque speed and efficiency curves which are located in the data section of this report. These graphs map the complete performance characteristics for the Chevrolet Luv Truck Manual transmission. This information will facilitate the vehicle manufacturer in the design of a more energy efficient vehicle.

  17. Transmission | Department of Energy

    Energy Savers [EERE]

    resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on...

  18. Transmission Business Line

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Business Line Non-Federal Financing of Transmission Projects - March 2004 Critical paths on the Northwest transmission grid are congested and the system is near or at...

  19. An Annotated Bibliography of High-Voltage Direct-Current Transmission and Flexible AC Transmission (FACTS) Devices, 1991-1993.

    SciTech Connect (OSTI)

    Litzenberger, Wayne; Lava, Val

    1994-08-01

    References are contained for HVDC systems, converter stations and components, overhead transmission lines, cable transmission, system design and operations, simulation of high voltage direct current systems, high-voltage direct current installations, and flexible AC transmission system (FACTS).

  20. Storage & Transmission Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & ...

  1. Transmission/Resource Library | Open Energy Information

    Open Energy Info (EERE)

    electric transmission systems, including in-depth discussion direct current, below-ground, and high-temperature superconductor lines. Includes sections on design features as...

  2. Especial Gear Transmissions EGT | Open Energy Information

    Open Energy Info (EERE)

    EGT Jump to: navigation, search Name: Especial Gear Transmissions (EGT) Place: Spain Sector: Wind energy Product: Designs, manufactures and repairs industrial wind gear reducers...

  3. DOE Transmission Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Order No. 1000 Transmission Ratemaking Enabling New Resources - Demand Response - Variable Generation - Storage 2 Stages of Transmission Planning - Local, ...

  4. Hydromechanical transmission

    DOE Patents [OSTI]

    Orshansky, Jr. deceased, Elias; Weseloh, William E.

    1978-01-01

    A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

  5. Road-corridor planning in the EIA procedure in Spain. A review of case studies

    SciTech Connect (OSTI)

    Loro, Manuel [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Politcnica de Madrid, Prof. Aranguren s Transport Research Centre Universidad Politcnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s Centro de investigacin del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politcnica de Madrid, Prof. Aranguren s Arce, Rosa M. [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Politcnica de Madrid, Prof. Aranguren s Transport Research Centre Universidad Politcnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s Centro de investigacin del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politcnica de Madrid, Prof. Aranguren s Ortega, Emilio [Transport Research Centre Universidad Politcnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s Centro de investigacin del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politcnica de Madrid, Prof. Aranguren s Department of Construction and Rural Roads, Forestry Engineering School, Universidad Politcnica de Madrid, Ciudad Universitaria s and others

    2014-01-15

    The assessment of different alternatives in road-corridor planning must be based on a number of well-defined territorial variables that serve as decision making criteria, and this requires a high-quality preliminary environmental assessment study. In Spain the formal specifications for the technical requirements stipulate the constraints that must be considered in the early stages of defining road corridors, but not how they should be analyzed and ranked. As part of the feasibility study of a new road definition, the most common methodology is to establish different levels of Territorial Carrying Capacity (TCC) in the study area in order to summarize the territorial variables on thematic maps and to ease the tracing process of road-corridor layout alternatives. This paper explores the variables used in 22 road-construction projects conducted by the Ministry of Public Works that were subject to the Spanish EIA regulation and published between 2006 and 2008. The aim was to evaluate the quality of the methods applied and the homogeneity and suitability of the variables used for defining the TCC. The variables were clustered into physical, environmental, land-use and cultural constraints for the purpose of comparing the TCC values assigned in the studies reviewed. We found the average quality of the studies to be generally acceptable in terms of the justification of the methodology, the weighting and classification of the variables, and the creation of a synthesis map. Nevertheless, the methods for assessing the TCC are not sufficiently standardized; there is a lack of uniformity in the cartographic information sources and methodologies for the TCC valuation. -- Highlights: We explore 22 road-corridor planning studies subjected to the Spanish EIA regulation. We analyze the variables selected for defining territorial carrying capacity. The quality of the studies is acceptable (methodology, variable weighting, mapping). There is heterogeneity in the methods for

  6. Usage of Electric Vehicle Supply Equipment Along the Corridors between the EV Project Major Cities

    SciTech Connect (OSTI)

    Mindy Kirkpatrick

    2012-05-01

    The report explains how the EVSE are being used along the corridors between the EV Project cities. The EV Project consists of a nationwide collaboration between Idaho National Laboratory (INL), ECOtality North America, Nissan, General Motors, and more than 40 other city, regional and state governments, and electric utilities. The purpose of the EV Project is to demonstrate the deployment and use of approximately 14,000 Level II (208-240V) electric vehicle supply equipment (EVSE) and 300 fast chargers in 16 major cities. This research investigates the usage of all currently installed EV Project commercial EVSE along major interstate corridors. ESRI ArcMap software products are utilized to create geographic EVSE data layers for analysis and visualization of commercial EVSE usage. This research locates the crucial interstate corridors lacking sufficient commercial EVSE and targets locations for future commercial EVSE placement. The results and methods introduced in this research will be used by INL for the duration of the EV Project.

  7. Cleaning Up the Hanford River Corridor and Improving Site Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 8, 2016 2 3 Continue Cleanup of the Central Plateau * Plutonium Finishing Plant (PFP) - Removing pre-demolition glove boxes - Completed work in main building that requires specially designed protective suits, called "Level B" suits; using the suits to ready 10 chemical tanks in Americium Recovery Facility (242-Z) for removal during demolition - Decontaminating Plutonium Reclamation Facility (236-Z) canyon - Readiness review for start of demolition scheduled for July Loading glove

  8. Cleaning Up the Hanford River Corridor and Improving Site Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plutonium Finishing Plant (PFP) Closure Update River & Plateau Committee Hanford Advisory Board Bryan Foley, Acting Federal Project Director PFP Closure Project June 10, 2014 2014 The Future 2 Plutonium Finishing Plant * Mission: Safely and compliantly demolish PFP to slab-on-grade by 2016 PFP: plutonium processing facility decades past its design life 3 PFP Recent Accomplishments * Continued Glovebox/Hood deactivation activities: * Removed HC-17 (HC-17P, HC-17DC, HC-17SBB) in March *

  9. RAPID/BulkTransmission/Transmission Siting & Interconnection...

    Open Energy Info (EERE)

    federal review). Bulk Transmission Transmission Siting & Interconnection in New Mexico New Mexico Statutes (N.M.S.) 62-9-1, 62-9-3(B), and 62-9-3.2 No Location Permit may be...

  10. NREL: Transmission Grid Integration - Transmission Planning and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Printable Version Transmission Grid Integration Home Issues Projects Western Wind & Solar ... Electricity Market Operations Energy Imbalance Markets FESTIV Model Active ...

  11. Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, DC - The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment...

  12. Transmission Capacity Forum

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Email Address: Name: Organization Entity Type: Select the best fit for your role... Energy Trader Transmission Provider Employee Transmission Purchaser Energy Scheduler...

  13. Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    SciTech Connect (OSTI)

    Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

    2011-02-01

    The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

  14. Sandia Energy - Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Grid Integration Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Grid Integration Transmission Grid Integration Transmission Grid...

  15. PSERC Webinar Series: Issues in Designing the Future Grid - Transmissi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Design at the National Level - January 24, 2012 PSERC Webinar Series: Issues in Designing the Future Grid - Transmission Design at the National Level - January 24, ...

  16. EIS-0386: EPA Notice of Availability of the Programmatic Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Designation of Energy Corridors in 11 Western States, Preferred Location of Future Oil, Gas, and Hydrogen Pipelines and Electricity Transmission and Distribution Facilities on Federal Land

  17. McNary-John Day Transmission Line Project, Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-30

    Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS

  18. Automated manual transmission controller

    DOE Patents [OSTI]

    Lawrie, Robert E.; Reed, Jr., Richard G.; Bernier, David R.

    1999-12-28

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  19. Transmission Planning Analysis Tool

    SciTech Connect (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identify weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.

  20. Transmission Planning Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identifymore » weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.« less

  1. The electric delivery system-a complex network of transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Researchers are concerned principally with five key ar- eas including market design, long-term supply and transmission investment, re- newable integration, demand response, and ...

  2. Hydrogen Delivery Technologies and Systems- Pipeline Transmission of Hydrogen

    Broader source: Energy.gov [DOE]

    Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen. Design and operations standards and materials for hydrogen and natural gas pipelines.

  3. NREL: Transmission Grid Integration - Publications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Publications Want updates about future transmission grid integration webinars and ... and Transmission Study Flexible Energy Scheduling Tool for Integration of ...

  4. Electrical Engineer- Transmission Lines

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration, Upper Great Plains Region, Maintenance, North Dakota Maintenance, Transmission...

  5. Current Transmission Rates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases Rate Information Current Power Rates Current Transmission Rates...

  6. Previous Transmission Rates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases Rate Information Current Power Rates Current Transmission Rates...

  7. 2012 Transmission Rate Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Transmission, Ancillary, and Control Area Service Rate Schedules and General Rate Schedule Provisions (FY 2014-2015) October 2013 United States Department of Energy...

  8. Collaborative Transmission Technology Roadmap

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Addendum to the Collaborative Transmission Technology Roadmap March 2014 Bonneville Power Administration Enhanced PDF Functionality Functionality of the PDF version of this...

  9. Transmission and Storage Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014 ...

  10. Transmission - Contact Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact-Information-Transmission Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  11. Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Energy, SMART Grid, Systems Analysis, Transmission Grid Integration, Wind Energy Sandia Contributes to International Electrotechnical Commission IEC 61400-26 Availability ...

  12. The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

    SciTech Connect (OSTI)

    Feist, E.T.

    2012-07-01

    Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the

  13. EC Transmission Line Materials

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-05-01

    The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

  14. Career Map: Power Systems/Transmission Engineer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems/Transmission Engineer Career Map: Power Systems/Transmission Engineer A stretch of wind turbines and power lines at dusk. Power Systems/Transmission Engineer Position Title Power Systems/Transmission Engineer Alternate Title(s) Electric Power Engineer, Electrical Interconnection Engineer, Electrical Design Engineer Education & Training Level Advanced, Bachelors required, prefer graduate degree Education & Training Level Description Power Systems Engineers typically have a

  15. Transmission Line Security Monitor

    SciTech Connect (OSTI)

    2011-01-01

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  16. Transmission Line Security Monitor

    ScienceCinema (OSTI)

    None

    2013-05-28

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  17. ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED WITHDRAWAL OF PUBLIC LANDS WITHIN AND SURROUNDING THE CALIENTE RAIL CORRIDOR, NEVADA

    SciTech Connect (OSTI)

    DOE

    2005-12-01

    The purpose for agency action is to preclude surface entry and the location of new mining claims, subject to valid existing rights, within and surrounding the Caliente rail corridor as described in the Yucca Mountain FEIS (DOE 2002). This protective measure is needed to enhance the safe, efficient, and uninterrupted evaluation of land areas for potential rail alignments within the Caliente rail corridor. The evaluation will assist the DOE in determining, through the Rail Alignment environmental impact statement (EIS) process, whether to construct a branch rail line, and to provide support to the BLM in deciding whether or not to reserve a ROW for the rail line under the Federal Land Policy and Management Act (FLPMA). The BLM participated as a cooperating agency in preparing this EA because it is the responsible land manager and BLM staff could contribute resource specific expertise.

  18. Defect tolerant transmission lithography mask

    DOE Patents [OSTI]

    Vernon, Stephen P.

    2000-01-01

    A transmission lithography mask that utilizes a transparent substrate or a partially transparent membrane as the active region of the mask. A reflective single layer or multilayer coating is deposited on the membrane surface facing the illumination system. The coating is selectively patterned (removed) to form transmissive (bright) regions. Structural imperfections and defects in the coating have negligible effect on the aerial image of the mask master pattern since the coating is used to reflect radiation out of the entrance pupil of the imaging system. Similarly, structural imperfections in the clear regions of the membrane have little influence on the amplitude or phase of the transmitted electromagnetic fields. Since the mask "discards," rather than absorbs, unwanted radiation, it has reduced optical absorption and reduced thermal loading as compared to conventional designs. For EUV applications, the mask circumvents the phase defect problem, and is independent of the thermal load during exposure.

  19. International 345 kV transmission line to Highgate, Vermont: environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1985-02-01

    The action under consideration is the issuance of a Presidential permit to the Vermont Electric Power Company, Inc. (VELCO) for the construction, operation, maintenance and connection of a facility that will cross the United States-Canada border for international transmission of electric energy. The proposed transmission facilities will consist of a 7.5 mile, alternating current (ac) transmission line and a 200 MW back-to-back direct current (dc) converter terminal station. None of the facilities will involve any polluting emissions. The construction and maintenance of the proposed converter terminal station and transmission facilities will have little or no impact on the geologic features of the region. The transmission line will have little or no effect on agricultural land. Impacts on commercial forestry in the area will be minimal. The proposed route will require clearing about 36 acres of forest. The proposed transmission line and converter terminal site will have no effect on recreational activities, mining activites, residential, commercial, or industrial land use. The proposed corridor will have a minimal impact on area terrestrial wildlife and plant communities. The proposed project will have little or no impact on future population distribution, the operation of local services, employment and economic benefit, or housing in either Franklin or Highgate. 16 references, 3 figures. (ACR)

  20. Downhole transmission system

    DOE Patents [OSTI]

    Hall, David R.; Fox, Joe

    2008-01-15

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

  1. Electricity Transmission, A Primer

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... the power from low-cost, mine- mouth coal power plants and wind generators in Wyoming. ... As a result, the transmission system helps to insulate electricity consumers from the ...

  2. Transmission Grid Integration

    Office of Energy Efficiency and Renewable Energy (EERE)

    The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

  3. Down hole transmission system

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

    2007-07-24

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

  4. A Geophysical Characterization & Monitoring Strategy for Determining Hydrologic Processes in the Hyporheic Corridor at the Hanford 300-Area

    SciTech Connect (OSTI)

    Slater, Lee; Day-Lewis, Frederick; Lane, John; Versteeg, Roelof; Ward, Anderson; Binley, Andrew; Johnson, Timothy; Ntarlagiannis, Dimitrios

    2011-08-31

    The primary objective of this research was to advance the prediction of solute transport between the Uranium contaminated Hanford aquifer and the Columbia River at the Hanford 300 Area by improving understanding of how fluctuations in river stage, combined with subsurface heterogeneity, impart spatiotemporal complexity to solute exchange along the Columbia River corridor. Our work explored the use of continuous waterborne electrical imaging (CWEI), in conjunction with fiber-optic distributed temperature sensor (FO-DTS) and time-lapse resistivity monitoring, to improve the conceptual model for how groundwater/surface water exchange regulates uranium transport. We also investigated how resistivity and induced polarization can be used to generate spatially rich estimates of the variation in depth to the Hanford-Ringold (H-R) contact between the river and the 300 Area Integrated Field Research Challenge (IFRC) site. Inversion of the CWEI datasets (a data rich survey containing {approx}60,000 measurements) provided predictions of the distributions of electrical resistivity and polarizability, from which the spatial complexity of the primary hydrogeologic units along the river corridor was reconstructed. Variation in the depth to the interface between the overlying coarse-grained, high permeability Hanford Formation and the underlying finer-grained, less permeable Ringold Formation, an important contact that limits vertical migration of contaminants, has been resolved along {approx}3 km of the river corridor centered on the IFRC site in the Hanford 300 Area. Spatial variability in the thickness of the Hanford Formation captured in the CWEI datasets indicates that previous studies based on borehole projections and drive-point and multi-level sampling likely overestimate the contributing area for uranium exchange within the Columbia River at the Hanford 300 Area. Resistivity and induced polarization imaging between the river and the 300 Area IFRC further imaged spatial

  5. Transmission Developers Inc.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ' % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of

  6. Transmission Infrastructure Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TRANSMISSION INFRASTRUCTURE PROGRAM DOE Tribal Energy Summit 2015 SECRETARYOF ENERGY'S FINANCING ROUNDTABLE Tracey A. LeBeau Senior Vice President & Transmission Infrastructure Program Manager 1 Program Description Western's Loan Authority * $3.25 billion permanent authority (revolving) * Goal: Attract investment in infrastructure & address market needs * Commercial underwriting standards TIP Portfolio Management Fundamentals * Reflective of Market Need(s) * Ensure Funds Revolve 2 Recent

  7. EIS-0411: Transmission Agency of Northern California Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

  8. Pipeline corridors through wetlands -- Impacts on plant communities: Little Timber Creek Crossing, Gloucester County, New Jersey. Topical report, August 1991--January 1993

    SciTech Connect (OSTI)

    Shem, L.M.; Zimmerman, R.E.; Alsum, S.K.; Van Dyke, G.D. |

    1994-12-01

    The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents results of a survey conducted over the period of August 5--7, 1991, at the Little Timber Creek crossing in Gloucester County, New Jersey, where three pipelines, constructed in 1950, 1960, and 1990, cross the creek and associated wetlands. The old side of the ROW, created by the installation of the 1960 pipeline, was designed to contain a raised peat bed over the 1950 pipeline and an open-water ditch over the 1960 pipeline. The new portion of the ROW, created by installation of the 1990 pipeline, has an open-water ditch over the pipeline (resulting from settling of the backfill) and a raised peat bed (resulting from rebound of compacted peat). Both the old and new ROWs contain dense stands of herbs; the vegetation on the old ROW was more similar to that in the adjacent natural area than was vegetation in the new ROW. The ROW increased species and habitat diversity in the wetlands. It may contribute to the spread of purple loosestrife and affect species sensitive to habitat fragmentation.

  9. National transmission grid study

    SciTech Connect (OSTI)

    Abraham, Spencer

    2003-05-31

    The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE’s Policy Office Electricity Modeling System (POEMS). DOE’s analysis, presented in Section 2, confirms the central role of the nation’s transmission system in lowering costs to consumers through increased trade. More importantly, DOE’s analysis also confirms the results of previous studies, which show that transmission bottlenecks and related transmission system market practices are adding hundreds of millions of dollars to consumers’ electricity bills each year. A more detailed technical overview of the use of POEMS is provided in Appendix A. DOE led an extensive, open, public input process and heard a wide range of comments and recommendations that have all been considered.1 More than 150 participants registered for three public workshops held in Detroit, MI (September 24, 2001); Atlanta, GA (September 26, 2001); and Phoenix, AZ (September 28, 2001).

  10. Integrated Transmission and Distribution Control

    SciTech Connect (OSTI)

    Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

    2013-01-16

    Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment

  11. Transmission Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented

  12. Strategy for the Integration of Hydrogen as a Vehicle Fuel into the Existing Natural Gas Vehicle Fueling Infrastructure of the Interstate Clean Transportation Corridor Project: 22 April 2004--31 August 2005

    SciTech Connect (OSTI)

    Gladstein, Neandross and Associates

    2005-09-01

    Evaluates opportunities to integrate hydrogen into the fueling stations of the Interstate Clean Transportation Corridor--an existing network of LNG fueling stations in California and Nevada.

  13. ITC Transmission | Open Energy Information

    Open Energy Info (EERE)

    ITC Transmission Jump to: navigation, search Name: ITC Transmission Place: Michigan Phone Number: Western Michigan Office: (269) 792-7223 -- Northern Michigan Office: (989)...

  14. Isotopic evidence of source variations in commingled magma systems: Colorado River extensional corridor, Arizona and Nevada

    SciTech Connect (OSTI)

    Metcalf, R.V.; Smith, E.I.; Martin, M.W. . Dept. of Geoscience); Gonzales, D.A.; Walker, J.D. . Isotope Geochronology Lab.)

    1993-04-01

    Mixing of mantle derived mafic and crustal derived felsic magmas is a major Province-wide process forming Tertiary intermediate magmas within the Basin and Range. Major variations in magma sources, however, may exist in temporally and spatially related systems. Such variations are exemplified by two closely spaced plutons within the northern Colorado River extensional corridor. The 15.96 Ma Mt. Perkins pluton (MPP) was emplaced in three major phases: phase 1 (oldest) gabbro; phase 2 quartz diorite to hornblende granodiorite; and phase 3 biotite granodiorite ([+-]hbld). Phases 2 and 3 contain mafic microgranitoid enclaves (MME) that exhibit evidence of magma mingling. Combined data from phase 2 and 3 rocks, including MMW, shows positive [sup 87]Sr/[sup 86]Sr and negative [var epsilon]Nd correlations vs. SiO[sub 2] (50--72 wt %). Phase 2 rocks, which plot between phase 2 MME and MME-free phase 3 granodiorite, represent hybrid magmas formed by mixing of mantle and crustal derived magmas. Phase 1 gabbro falls off isotope-SiO[sub 2] trends and represents a separate mantle derived magma. The 13.2 Ma Wilson Ridge pluton (WRP), <20 km north of MPP, is cogenetic with the river Mountains volcano (RMV). In WRP an early diorite was intruded by a suite of monzodiorite to quartz monzonite. The monzodiorite portion contains MME and mafic schlieren representing mingled and mixed mafic magmas. The WRP and MPP represent two closely spaced isotopically distinct and separate magma systems. There are five magma sources. The two felsic mixing end members represent two different crustal magma sources. Two mantle sources are presented by MPP phase 1 gabbro and phase 2 MME, reflecting lithospheric and asthenospheric components, respectively. The latter represents the oldest reported Tertiary asthenospheric component within the region. A single lithospheric mantle source, different from the MPP gabbro, is indicated for the mafic mixing end member in the WRP-RMV suite.

  15. A First Preliminary Look: Are Corridor Charging Stations Used to Extend the Range of Electric Vehicles in The EV Project?

    SciTech Connect (OSTI)

    John Smart

    2013-01-01

    A preliminary analysis of data from The EV Project was performed to begin answering the question: are corridor charging stations used to extend the range of electric vehicles? Data analyzed were collected from Blink brand electric vehicle supply equipment (EVSE) units based in California, Washington, and Oregon. Analysis was performed on data logged between October 1, 2012 and January 1, 2013. It should be noted that as additional AC Level 2 EVSE and DC fast chargers are deployed, and as drivers become more familiar with the use of public charging infrastructure, future analysis may have dissimilar conclusions.

  16. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

    1997-01-01

    A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

  17. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1997-03-25

    A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

  18. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M.

    1993-01-01

    A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  19. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1993-03-23

    A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  20. 2006 National Electric Transmission Congestion Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate

  1. 2009 National Electric Transmission Congestion Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate

  2. EIS-0436: I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a BPA proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon.

  3. EC Transmission Line Risk Identification and Analysis

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-04-01

    The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

  4. Drill string transmission line

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David S.; Bradford, Kline; Fox, Joe

    2006-03-28

    A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

  5. Shock transmissibility of threaded joints

    SciTech Connect (OSTI)

    Hansen, N.R.; Bateman, V.I.; Brown, F.A.

    1996-12-31

    Sandia National Laboratories (SNL) designs mechanical systems with threaded joints that must survive high shock environments. These mechanical systems include penetrators that must survive soil and rock penetration; drilling pipe strings that must survive rock-cutting, shock environments; and laydown weapons that must survive delivery impact shock. This paper summarizes an analytical study and an experimental evaluation of compressive, one-dimensional, shock transmission through a threaded joint in a split Hopkinson bar configuration. Thread geometries were scaled to simulate large diameter threaded joints with loadings parallel to the axis of the threads. Both strain and acceleration were evaluated with experimental measurements and analysis. Analytical results confirm the experimental conclusions that in this split Hopkinson bar configuration, the change in the one-dimensional shock wave by the threaded joint is localized to a length equal to a few diameters` length beyond the threaded joint.

  6. Transmission and Storage Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014 Agenda * DTE Gas Snapshot * NOx & CO - Combustion stability * Methane - Packing - Blowdowns * Capture vs Flare 2 SNAPSHOT * DTE Gas - 41 Units * Age Range: 8-59yrs (Average 45yrs) - 118,200HP * 1,000-15,000HP - 7 different manufacturers * Cooper-Bessemer, Solar, Waukesha, DeLaval, IR, CAT, Ariel - Complete Mixture *

  7. Appendix TFIELD: Transmissivity Fields

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Appendix TFIELD-2014 Transmissivity Fields United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Appendix TFIELD-2014 Table of Contents TFIELD-1.0 Overview of the T-field Development, Calibration, and Mining Modification Process TFIELD-2.0 Geologic Data TFIELD-2.1 Culebra Hydrogeologic Setting TFIELD-2.2 Refinement of Geologic Boundaries TFIELD-2.2.1 Rustler Halite Margins TFIELD-2.2.2 Salado

  8. Geothermal Resources and Transmission Planning

    Broader source: Energy.gov [DOE]

    This project addresses transmission-related barriers to utility-scale deployment of geothermal electric generation technologies.

  9. GTT 2012 Transmission Workshop- Documents

    Broader source: Energy.gov [DOE]

    Use the links below to download documents from the GTT's Transmission Workshop, held November 1-2, 2012

  10. Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Peterson, M.J.

    2005-12-20

    This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description of the affected

  11. Electricity Transmission, A Primer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system, the economics, and the policies. Electricity Transmission, A Primer (1.95 MB) More Documents & Publications Draft Chapter 4: Transmission Adequacy Electricity Grid Basics Webinar Presentation Slides and Text Version Chapter 4 Transmission Adequacy

  12. Colorado Electrical Transmission Grid

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2012-02-01

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Xcel Energy Publication Date: 2012 Title: Colorado XcelEnergy NonXcel Transmission Network Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains transmission network of Colorado Spatial Domain: Extent: Top: 4540689.017558 m Left: 160606.141934 m Right: 758715.946645 m Bottom: 4098910.893397m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shapefile

  13. Automated manual transmission clutch controller

    DOE Patents [OSTI]

    Lawrie, Robert E.; Reed, Jr., Richard G.; Rausen, David J.

    1999-11-30

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  14. RAPID/Bulk Transmission | Open Energy Information

    Open Energy Info (EERE)

    Page Edit History RAPIDBulk Transmission < RAPID(Redirected from RAPIDOverviewBulkTransmission) Redirect page Jump to: navigation, search REDIRECT RAPIDBulkTransmission...

  15. Electricity Transmission, A Primer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the...

  16. 2015 National Electric Transmission Congestion Study | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 National Electric Transmission Congestion Study 2015 National Electric Transmission Congestion Study 2015 National Electric Transmission Congestion Study Section 1221(a) of ...

  17. Bordertown to California Transmission | Open Energy Information

    Open Energy Info (EERE)

    Transmission EIS Bordertown to California 120kV Transmission Line Project Environmental Impact Statement General NEPA Document Info Energy Sector Transmission Environmental...

  18. Dynamic Transmission Electron Microscopy

    SciTech Connect (OSTI)

    Evans, James E.; Jungjohann, K. L.; Browning, Nigel D.

    2012-10-12

    Dynamic transmission electron microscopy (DTEM) combines the benefits of high spatial resolution electron microscopy with the high temporal resolution of ultrafast lasers. The incorporation of these two components into a single instrument provides a perfect platform for in situ observations of material processes. However, previous DTEM applications have focused on observing structural changes occurring in samples exposed to high vacuum. Therefore, in order to expand the pump-probe experimental regime to more natural environmental conditions, in situ gas and liquid chambers must be coupled with Dynamic TEM. This chapter describes the current and future applications of in situ liquid DTEM to permit time-resolved atomic scale observations in an aqueous environment, Although this chapter focuses mostly on in situ liquid imaging, the same research potential exists for in situ gas experiments and the successful integration of these techniques promises new insights for understanding nanoparticle, catalyst and biological protein dynamics with unprecedented spatiotemporal resolution.

  19. Gas cell for in situ soft X-ray transmission-absorption spectroscopy...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    cell for in situ soft X-ray transmission-absorption spectroscopy of materials Previous ... Abstract: A simple gas cell design, constructed primarily from commercially available ...

  20. 2012 National Electric Transmission Congestion Study: Presentation...

    Energy Savers [EERE]

    2012 National Electric Transmission Congestion Study: Presentation from Congestion Study Webinar Series 2012 National Electric Transmission Congestion Study: Presentation from...

  1. Transmission line environmental assessment guidance document

    SciTech Connect (OSTI)

    Jackson, J.; Pentecost, E.; Muzzarelli, J.

    1994-01-01

    Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

  2. NREL: Transmission Grid Integration - News

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The National Renewable Energy Laboratory (NREL) will be strongly supporting this ... Archives 2015 | 2014 Printable Version Transmission Grid Integration Home Issues Projects ...

  3. NREL: Transmission Grid Integration - Webmaster

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Your message: Send Message Printable Version Transmission Grid Integration Home Issues ... NREL is a national laboratory of the U.S. Department of Energy, Office of Energy ...

  4. DOE Electricity Transmission System Workshop

    Broader source: Energy.gov (indexed) [DOE]

    ... Activities can span from basic R&D through demonstration projects. Parallel Breakout Sessions (see white paper: "DOE Action Plan Addressing the Electricity Transmission System") ...

  5. Vice President, Transmission System Operations

    Broader source: Energy.gov [DOE]

    The VP for Transmission System Operations provides strategic leadership, direction, and oversight of the people, business processes, and systems that are responsible for the safe, reliable, and...

  6. AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION

    Broader source: Energy.gov [DOE]

    The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

  7. Electric Transmission Line Siting Compact

    Office of Environmental Management (EM)

    ... creates a method for states to site multi-state electric transmission lines. Three 4 levels of organization are provided: 5 A state project review panel within each ...

  8. Transmission Expansion in the Midwest

    Broader source: Energy.gov [DOE]

    At this unique forum, participants will hear top executives from the area's RTOs, utilities, transmission developers, and state regulatory agencies discuss and debate the most critical issues...

  9. HVDC power transmission technology assessment

    SciTech Connect (OSTI)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D.; Johnson, B.K.; Stewart, J.R.; Fink, J.L.

    1997-04-01

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  10. EIS-0250-S2: Supplemental EIS for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada- Nevada Rail Transportation Corridor

    Broader source: Energy.gov [DOE]

    This SEIS is to evaluate the potential environmental impacts of constructing and operating a railroad for shipments of spent nuclear fuel and high-level radioactive waste from an existing rail line in Nevada to a geologic repository at Yucca Mountain. The purpose of the evaluation is to assist the Department in deciding whether to construct and operate a railroad in Nevada, and if so, in which corridor and along which specific alignment within the selected corridor.

  11. Energy Transmission and Infrastructure

    SciTech Connect (OSTI)

    Mathison, Jane

    2012-12-31

    The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers

  12. The Wheeling and Transmission Manual, Second Edition

    SciTech Connect (OSTI)

    Weiss, L.; Spiewak, S.

    1991-01-01

    The Wheeling and Transmission Manual addresses the key issues involved in the debate: the need for coordination, the extent to which access should be permitted, various pricing methodologies which might be employed, obstacles to the addition of new transmission capacity, and contractual matters which should be considered in negotiations between the parties. As one shall see, these matters are all interrelated and the resolution of any of them may affect the outcome of the others. The Manual is designed to give an overview of the issues involved. It is not intended exclusively for the expert engineer or attorney, although both might benefit from it. Rather, the Manual was written with the objective of providing decisionmakers and policymakers with detailed, timely and understandable materials to evaluate the specific circumstances affecting their companies. Each chapter of the book is indexed separately.

  13. Regional Transmission Projects: Finding Solutions

    SciTech Connect (OSTI)

    The Keystone Center

    2005-06-15

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association

  14. Effects of high-voltage transmission lines on honeybees

    SciTech Connect (OSTI)

    Greenberg, B.; Bindokas, V.P.; Gauger, J.R.

    1985-05-01

    When shielded and exposed colonies were placed at incremental distances at a right angle from a 760-kV transmission line different thresholds for biologic effects were obtained. Hive exposures were controlled (E-field: 7, 5.5, 4.1, 1.8, and 0.65 to 0.85 kV/m) by variable height current collectors; shielded hives under the line behave normally. Exposure to 7 kV/m can produce the following sequence of events: (1) increased motor activity and transient hive temperature increase; (2) abnormal propolization; (3) retarded hive weight gain; (4) excess queen cell production with queen loss; (5) reduction of sealed brood area; and (6) poor winter survival. No biological effects were detected below 4.1 kV/m, thus the ''biological effects corridor'' is limited to approximately 23 m beyond a ground projection of each outer phase wire. Hive architecture enhances E-fields and creates shock hazards for bees. Intra-hive E-fields (15 to 100+ kV/m) were measured with a displacement current sensor and fiber optic telemetry link. Step-potential-induced currents up to 0.5 uA were measured with a bee model in hives at 7 kV/m. To investigate further the role of shock versus electric field exposure the study was continued to develop hive entrance extensions (porches), which produce controlled bee exposure to E-field or shock, and to test the feasibility of using these porches in such a study. Biological effects (e.g., abnormal propolization, retarded hive weight, queen loss) found in colonies with total-hive exposure were produced by entrance-only exposure of adult bees. We now have an exposure system in which E-field and shock can be separately controlled to reproduce the biological effects. 10 refs.

  15. Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions

    Broader source: Energy.gov [DOE]

    Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed that gap in recent...

  16. Electrical transmission line diametrical retainer

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David; Dahlgren, Scott; Sneddon, Cameron; Briscoe, Michael; Fox, Joe

    2004-12-14

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

  17. High-Power Microwave Transmission and Mode Conversion Program

    SciTech Connect (OSTI)

    Vernon, Ronald J.

    2015-08-14

    This is a final technical report for a long term project to develop improved designs and design tools for the microwave hardware and components associated with the DOE Plasma Fusion Program. We have developed basic theory, software, fabrication techniques, and low-power measurement techniques for the design of microwave hardware associated gyrotrons, microwave mode converters and high-power microwave transmission lines. Specifically, in this report we discuss our work on designing quasi-optical mode converters for single and multiple frequencies, a new method for the analysis of perturbed-wall waveguide mode converters, perturbed-wall launcher design for TE0n mode gyrotrons, quasi-optical traveling-wave resonator design for high-power testing of microwave components, and possible improvements to the HSX microwave transmission line.

  18. ANUEADflM-31 Electric Power High-Voltage Transmission Lines:

    Office of Scientific and Technical Information (OSTI)

    ... design options to reduce human exposure to EMFs from high-voltage transmission lines. ... assumed for the 345-kV designs: 150-R rights-of-way for overhead lines, 50-ft ...

  19. Transmission Services Product Pricing Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and 09:00 PPT on the above effective date. On October 15, 2013, at 08:00 (PPT), Transmission Services will be updating the OASIS default product prices to reflect the 2014...

  20. Transmission Services Product Pricing Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and 12:00 PPT on the above effective date. On October 1, 2015, at 11:00 (PPT), Transmission Services will be updating the OASIS default product prices to reflect the 2016...

  1. Bulk Power Generation and Transmission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovative Opportunities Blue lines: Transmission Grid Red lines: Lines that are congested or at outages - in RealTime Yellow and Red iconsdots: Power plant RealTime production ...

  2. National Transmission Grid Study: 2002

    Broader source: Energy.gov [DOE]

    National Transmission Grid Study: The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity...

  3. EIS-0231: Navajo Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned...

  4. Transmission Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action ...

  5. FINAL PROJECT REPORT: A Geophysical Characterization & Monitoring Strategy for Determining Hydrologic Processes in the Hyporheic Corridor at the Hanford 300-Area

    SciTech Connect (OSTI)

    Lee Slater

    2011-08-15

    The primary objective of this research was to advance the prediction of solute transport between the Uranium contaminated Hanford aquifer and the Columbia River at the Hanford 300 Area by improving understanding of how fluctuations in river stage, combined with subsurface heterogeneity, impart spatiotemporal complexity to solute exchange along the Columbia River corridor. Our work explored the use of continuous waterborne electrical imaging (CWEI), in conjunction with fiber-optic distributed temperature sensor (FO-DTS) and time-lapse resistivity monitoring, to improve the conceptual model for how groundwater/surface water exchange regulates uranium transport. We also investigated how resistivity and induced polarization can be used to generate spatially rich estimates of the variation in depth to the Hanford-Ringold (H-R) contact between the river and the 300 Area Integrated Field Research Challenge (IFRC) site. Inversion of the CWEI datasets (a data rich survey containing ~60,000 measurements) provided predictions of the distributions of electrical resistivity and polarizability, from which the spatial complexity of the primary hydrogeologic units along the river corridor was reconstructed. Variation in the depth to the interface between the overlying coarse-grained, high permeability Hanford Formation and the underlying finer-grained, less permeable Ringold Formation, an important contact that limits vertical migration of contaminants, has been resolved along ~3 km of the river corridor centered on the IFRC site in the Hanford 300 Area. Spatial variability in the thickness of the Hanford Formation captured in the CWEI datasets indicates that previous studies based on borehole projections and drive-point and multi-level sampling likely overestimate the contributing area for uranium exchange within the Columbia River at the Hanford 300 Area. Resistivity and induced polarization imaging between the river and the 300 Area IFRC further imaged spatial variability in

  6. Electricity Generation, Transmission and Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generation, Transmission and Energy Storage Systems Utilities and other electricity and transmission providers and regulators often require that equipment be proven safe and reliable before it is permitted on the grid. However, energy storage manufacturers and integrators are often unable to afford or provide the logistics necessary for this long-term testing and monitoring. The Energy Storage Test Pad (ESTP) in conjunction with the Energy Storage Analysis Laboratory (ESAL) provides trusted,

  7. Transmission SEAB Presentation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation (584.95 KB) More Documents & Publications Before House Natural Resources Committee QER - Comment of American Public Power Association 5 Before the House Committee on Natural Resources

  8. Chapter 4 Transmission Adequacy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development

  9. Electric Transmission Siting | Open Energy Information

    Open Energy Info (EERE)

    OtherOther: Electric Transmission SitingLegal Abstract Brief overview of the California Public Utilities Commission's process for siting of electric transmission lines. Published...

  10. Interconnection-Wide Transmission Planning Initiative - Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to ...