  1. American Transmission Company Comments- 216h Interim Final Rules

    Office of Energy Efficiency and Renewable Energy (EERE)

    American Transmission Company LLC, by its corporate manager, ATC Management Inc. (collectively “ATCLLC”) is pleased to have the opportunity to provide the following comments on the additional...

  2. Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Public Utilities Commission of Ohio

    Broader source: Energy.gov [DOE]

    Comments of the PUCO on the application from Internation Transmission Company to construct, operate, and maintain electric transmision facilities at the U.S-Canada border.

  3. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses

    SciTech Connect (OSTI)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments.

  4. QER- Comment of Southern Company

    Broader source: Energy.gov [DOE]

    Southern Company Services, Inc., as agent for Alabama Power Company, Georgia Power Company, Gulf Power Company, and Mississippi Power Company, (collectively, “Southern Companies”), are pleased to hereby provide their comments to the Department of Energy as it prepares the Quadrennial Energy Review. If there is anything else that we can do in this regard, please feel free to contact us.

  5. Goodman Manufacturing Company Comment

    Office of Energy Efficiency and Renewable Energy (EERE)

    These comments are submitted by Goodman Global, Inc. (“Goodman”) in response to the U.S. Department of Energy’s (DOE) request for information (RFI) appearing in the Federal Register on July 3, 2014.

  6. PP-230 International Transmission Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    International Transmission Company PP-230 International Transmission Company Presidential permit authorizing International Transmission Company to construct, operate, and maintain ...

  7. Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities

    Broader source: Energy.gov [DOE]

    Motion to intervene out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation...

  8. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comment from Mr. Garrett Plains and Eastern Clean Line Transmission Line: Comment from Ms. Rutherford Plains and Eastern Clean Line Transmission Line: Comment from Ms. Campbell

  9. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comment from Downwind, LLC Plains and Eastern Clean Line Transmission Line: Comment from Sheila Beck Plains and Eastern Clean Line Transmission Line: Comment from Crystal Yarbrough

  10. PP-230-2 International Transmission Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 International Transmission Company PP-230-2 International Transmission Company Presidential permit authorizing International Transmission Company to construct, operate, and ...

  11. PP-230-4 International Transmission Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 International Transmission Company PP-230-4 International Transmission Company Presidential Permit authorizing International Transmission Company to construct, operate and ...

  12. Motion to Intervene Out of Time and Comments of FirstEnergy Service Company

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PP-230-3 | Department of Energy and Comments of FirstEnergy Service Company PP-230-3 Motion to Intervene Out of Time and Comments of FirstEnergy Service Company PP-230-3 Motion to Intervene Out of Time and Comments of FirstEnergy Service Company Motion to Intervene Out of Time and Comments of FirstEnergy Service Company PP-230-3 (1.89 MB) More Documents & Publications PP-230-3 International Transmission Company Application for presidential permit OE Docket No. PP-230-4 International

  13. Comments of Baltimore Gas & Electric Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Baltimore Gas & Electric Company Comments of Baltimore Gas & Electric Company BGE comments to DOE addressing policy and logistical challenges Comments of Baltimore Gas & Electric Company (396.35 KB) More Documents & Publications NBP RFI: Data Access, Third Party Use and Privacy- Comments of Baltimore Gas & Electric Company NBP RFI: Communications Requirements- Comments of Baltimore Gas & Electric Company The Need for Essential Consumer Protections: Smart Metering

  14. PP-230-1 International Transmission Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 International Transmission Company PP-230-1 International Transmission Company Presidential permit authorizing British Columbia Electric Company, Limited to construct, operate, ...

  15. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from Dr. Contreras Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras Comment submitted on updated Part 2 application. PDF icon Comment from Dr. Contreras ...

  16. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ms. Callahan Plains and Eastern Clean Line Transmission Line: Comment from Ms. Callahan Comment submitted on updated Part 2 application. PDF icon Comment from Ms. Callahan ...

  17. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plains and Eastern Clean Line Transmission Line: Comment from Mr. Dyer Plains and Eastern Clean Line Transmission Line: Comment from Sheila Beck Plains and Eastern Clean Line ...

  18. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plains and Eastern Clean Line Transmission Line: Comment from Change.org Plains and Eastern Clean Line Transmission Line: Comment from Mr. Leftwich Plains and Eastern Clean Line ...

  19. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plains and Eastern Clean Line Transmission Line: Comment from Fallon Sanford Plains and Eastern Clean Line Transmission Line: Comment from Mr. Leftwich Plains and Eastern Clean ...

  20. Comments of Oncor Electric Delivery Company LLC | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oncor Electric Delivery Company LLC Comments of Oncor Electric Delivery Company LLC Comments of Oncor Electric Delivery Company LLC on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Comments of Oncor Electric Delivery Company LLC (52.37 KB) More Documents & Publications Current Communications Needs Future Communications Needs NBP RFI: Data Access, Third Party Use, and Privacy- Comments of Oncor

  1. American Transmission Company LLC | Open Energy Information

    Open Energy Info (EERE)

    LLC Jump to: navigation, search Name: American Transmission Company LLC Place: Waukesha, WI References: SGIC1 This article is a stub. You can help OpenEI by expanding it....

  2. Plains and Eastern Clean Line Transmission Line: Comment from Marshall

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hughes | Department of Energy from Marshall Hughes Plains and Eastern Clean Line Transmission Line: Comment from Marshall Hughes Comment submitted on updated Part 2 application. Comment from Marshall Hughes 07-10-15.pdf (14.91 KB) More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from Mr. Dyer Plains and Eastern Clean Line Transmission Line: Comment from Sheila Beck Plains and Eastern Clean Line Transmission Line: Comment from Patti McCutchen

  3. Comments of New England Electric Transmission Corporation on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission ...

  4. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Clean Line: Arkansas and Oklahoma Plains and Eastern Clean Line Transmission Line: Comment from Block Plains and Eastern Clean Line: Arkansas and Oklahoma Comment submitted on ...

  5. PP-76 The Vermont Electric Transmission Company | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Vermont Electric Transmission Company to construct, operate, and maintain transmission facilities at the U.S. - Canada Border. PDF icon PP-76 The Vermont Electric Transmission ...

  6. PP-230-3 International Transmission Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 International Transmission Company PP-230-3 International Transmission Company Presidential permit authorizing International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border. PP-230-3 (1.07 MB) More Documents & Publications Application for Presidential Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission Application for presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC Holdings

  7. American Transmission Company LLC II Smart Grid Project | Open...

    Open Energy Info (EERE)

    your syntax: * Display map References ARRA Smart Grid Investment Grants1 American Transmission Smart Grid2 American Transmission Company, LLC has been selected by the U.S....

  8. National Electric Transmission Congestion Study - Draft for Public Comment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2014 | Department of Energy - Draft for Public Comment August 2014 National Electric Transmission Congestion Study - Draft for Public Comment August 2014 On August 19, 2014, the Department issued a Federal Register Notice announcing the availability of a draft of its National Electric Transmission Congestion Study for public comment. The draft study is available below for review and downloading. The public comment period closed on October 20, 2014. Comments have been posted online.

  9. Reply Comments of Southern Company Services, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Southern Company Services, Inc. Reply Comments of Southern Company Services, Inc. Southern Company Services, Inc. ("Southern"), on behalf of itself and its operating affiliates, hereby submits its reply comments in response to the Department of Energy's ("DOE's") Request for Information ("RFI"), released May 5, 2010, about current and projected communications requirements of electric utilities.1 Southern appreciates the opportunity to provide DOE with additional

  10. Joint comments of consumers energy company and the detriot edison company

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on notice of proposed amendment. FE Docket No. 99-1 | Department of Energy comments of consumers energy company and the detriot edison company on notice of proposed amendment. FE Docket No. 99-1 Joint comments of consumers energy company and the detriot edison company on notice of proposed amendment. FE Docket No. 99-1 Pursuant to the department of energy's notice of proposed amendment to presidential permits and export authorizations and delegation and assignment to the federal energy

  11. 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments

    Broader source: Energy.gov [DOE]

    The Federal Register Notice of Inquiry requesting comments and providing notice of a technical conference for the 2006 National Electric Transmission Congestion Study was issued February 2, 2006.

  12. Goodman Manufacturing Company Comment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    These comments are submitted by Goodman Global, Inc. ("Goodman") in response to the U.S. Department of Energy's (DOE) request for information (RFI) appearing in the Federal...

  13. Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company

    Office of Energy Efficiency and Renewable Energy (EERE)

    Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company on the application from International Transmission Company to construct, operate, and maintain electric...

  14. Comments of Southern Company Services, Inc. on DOE Request for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information-Implementing the National Broadband Plan by Empowering Customers and the Smart Grid: Data Access, Third Party Use, and Privacy | Department of Energy Southern Company Services, Inc. on DOE Request for Information-Implementing the National Broadband Plan by Empowering Customers and the Smart Grid: Data Access, Third Party Use, and Privacy Comments of Southern Company Services, Inc. on DOE Request for Information-Implementing the National Broadband Plan by Empowering Customers and

  15. Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Dr. Contreras Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras Comment submitted on updated Part 2 application. Comment from Dr. Contreras 6-10-15.pdf (608.36 KB) More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras

  16. PP-76-1 The Vermont Electric Transmission Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    76-1 The Vermont Electric Transmission Company PP-76-1 The Vermont Electric Transmission Company Presidential Permit authorizing The Vermont Electric Transmission Company to construct, operate, and maintain transmission facilities at the U.S. - Canada Border PP-76-1 The Vermont Electric Transmission Company (1.18 MB) More Documents & Publications PP-76 The Vermont Electric Transmission Company PP-69 Vermont Electric Cooperative, Inc. PP-66-1 Vermont Electric Power Company, Inc.

  17. Comments on RFI on Permitting of Transmission Lines Available

    Broader source: Energy.gov [DOE]

    The Department of Energy’s Office of Electricity Delivery and Energy Reliability released a Federal Register Notice seeking information on questions related to permitting of transmission lines. The Request for Information focused on making the development times for generation and transmission more commensurate with one another. Public comments received are now available for review and downloading.

  18. The case for reasonable incentives to promote independent transmission companies

    SciTech Connect (OSTI)

    Angle, S.; Carpentier, D.A.; Farinella, M.

    1999-09-01

    As part of its restructuring efforts in the electric utility industry, the Federal Energy Regulatory Commission (FERC) has encouraged voluntary corporate unbundling in an effort to promote a competitive electric market, recently proposing to define the minimal and desired characteristics of a regional transmission organization (RTO). The promotion of competition requires certain features in a transmission system, which include inter alia, (1) independent operation; (2) efficient pricing of congestion; (3) congestion management; (4) provision of ancillary services; (5) elimination of pancaked transmission rates; (6) appropriate transmission pricing; and (7) price transparency. A promising type of corporate unbundling that can provide these features is an independent transmission company (ITC).

  19. PP-420 Nogales Transmission, L.L.C.: Comment from Jean Public | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy : Comment from Jean Public PP-420 Nogales Transmission, L.L.C.: Comment from Jean Public Public comment on the Federal Register from Jean Public denying the transmission line of Nogales Interconnection Project to construct, operate and maintain electric transmission facilities at the U.S. - Mexico border. PP-420 Nogales Interconnection Project - Comment from Jean Public 05-23-16.pdf (128.05 KB) More Documents & Publications PP-420 Nogales Transmission L.L.C. - Comment from

  20. PP-420 Nogales Transmission, L.L.C. - Comment from Fresh Produce

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Association of the Americas | Department of Energy - Comment from Fresh Produce Association of the Americas PP-420 Nogales Transmission, L.L.C. - Comment from Fresh Produce Association of the Americas Public comment from Fresh Produce Association of the Americas on the Nogales Interconnection Project to construct, operate and maintain electric transmission facilities at the U.S. - Mexico Border. Nogales Interconnection Project Comments-FPAA 6-20-16.pdf (175.62 KB) More Documents &

  1. Plains and Eastern Clean Line Transmission Line: Comment from Block Plains

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Eastern Clean Line: Arkansas and Oklahoma | Department of Energy Block Plains and Eastern Clean Line: Arkansas and Oklahoma Plains and Eastern Clean Line Transmission Line: Comment from Block Plains and Eastern Clean Line: Arkansas and Oklahoma Comment submitted on updated Part 2 application. Comment from Block Plains & Eastern Clean Line Arkansas and Oklahoma 06-08-15.pdf (1.21 MB) More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from Block

  2. Plains and Eastern Clean Line Transmission Line: Comment from Save The

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ozarks | Department of Energy from Save The Ozarks Plains and Eastern Clean Line Transmission Line: Comment from Save The Ozarks Comment submitted on updated Part 2 application. Comment by Save the Ozarks 07-13-15.pdf (112.79 KB) More Documents & Publications Plains & Eastern Clean Line Transmission Line - Part 2 Application Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains and

  3. Comments of Southern Company Services, Inc. on DOE Request for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Customers and the Smart Grid: Data Access, Third Party Use, and Privacy Southern Company Services, Inc., for itself and on behalf of Alabama Power Company, Georgia Power ...

  4. From: Austin Bird To: Congestion Study Comments Subject: Citizen Comment: National Interest Energy Transmission Corridors (NIETC"s)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Austin Bird To: Congestion Study Comments Subject: Citizen Comment: National Interest Energy Transmission Corridors (NIETC"s) Date: Monday, October 06, 2014 10:00:01 AM To Whomever It May Concern; I am writing in support of the establishment of National Interest Energy Transmission Corridors (NIETCs). The establishment of these corridors would further the progress of the budding alternative energy sector in the Midwest, particularly in my state, Iowa. I am a resident of Davenport, Iowa, and

  5. Draft National Electric Transmission Congestion Study Now Available for Public Comment

    Broader source: Energy.gov [DOE]

    The Department of Energy has issued a Notice of Public Comment in the Federal Register, inviting the public to comment on the draft National Electric Transmission Congestion Study. The draft study is now available for review and downloading at http://www.energy.gov/node/942311. The public comment period will close on October 20, 2014. After reviewing and considering comments on the draft study, the Department will prepare and release a final version of the study.

  6. From: Scott Thorsen To: Congestion Study Comments Subject: Transmission Congestion Study Comments

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Congestion Study Comments Date: Sunday, October 19, 2014 9:06:10 PM I find the Department of Energy's Congestion Report is be most disturbing. While the author explains the definitions used for "congestion" and "constraint" to be narrowly defined, I find these terms to be broad and ambiguous. Right now America has an abundance of wind energy in the Midwest. Decisions to build these wind warms were not made based on market conditions, like basic supply and demand.

  7. QER- Comment of Pacific Gas and Electric Company

    Broader source: Energy.gov [DOE]

    PG&E is committed to protecting our customers' privacy. To learn more, please visit http://www.pge.com/about/company/privacy/customer/

  8. Sierra Pacific Power Company Alturas Transmission Line Project. Final environmental impact report/environmental impact statement, Volume I

    SciTech Connect (OSTI)

    1995-11-01

    This Environmental Impact Report/Environmental Impact Statement (EIR/S) describes the environmental setting and consequences of the construction and operation of the proposed Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCo) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power. This document was prepared by the California Public Utilities Commission (CPUC) and the U.S. Department of the Interior, Bureau of Land Management (BLM), pursuant to the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA), respectively. The purpose of this joint EIR/S is to report the results of the CPUC`s and BLM`s independent assessment of the potential environmental impacts that would result from the construction, operation, and maintenance of the proposed Alturas Transmission Line Project. The impact analysis is accompanied by the identification of feasible mitigation measures which, if incorporated into the project, would avoid or minimize impacts. This EIR/S also assesses alternatives to the Proposed Project and identifies those with the potential to eliminate or minimize impacts. This document considers comments made by agencies and the general public during the public scoping and Draft EIR/S comment periods.

  9. EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

  10. Joint comments of consumers energy company and the detriot edison...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Northeast Power Coordinating Council FE Docket No. 99-1 Joint Motion to Intervene of Northern States Power Company (Minnesota) et al. on the Proposed Open Access Requirements

  11. Potomac Electric Power Company's Motion to Intervene and Comment in Support

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Emergency Petition and Complaint | Department of Energy to Intervene and Comment in Support of Emergency Petition and Complaint Potomac Electric Power Company's Motion to Intervene and Comment in Support of Emergency Petition and Complaint Docket No. EO-05-01. Docket No. EL05-145-000: Pursuant to Rules 211 and 214 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or the "Commission"), 18 C.F.R. §§ 385.211 and 385.214 (2004),

  12. From: Carl Daffron To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Carl Daffron To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors Date: Monday, September 22, 2014 12:47:15 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undue burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. Second, I believe that

  13. From: Carol Johnson To: Congestion Study Comments Subject: Re: National Interest Energy Transmission Corridors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Johnson To: Congestion Study Comments Subject: Re: National Interest Energy Transmission Corridors Date: Sunday, October 19, 2014 8:20:41 AM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undo burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. I am a landowner in the path

  14. From: Noralie Crow To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors (NIETC)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Noralie Crow To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors (NIETC) Date: Monday, September 22, 2014 6:50:56 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undo burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. Second, I believe

  15. From: Tunnell, Andrew To: Congestion Study Comments Subject:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Southern Companies" Comments to Draft National Electric Transmission Congestion Study Date: Monday, October 20, 2014 3:17:22 PM Attachments: balch_logof0638c DOE Congestion Comments.pdf In accordance with the Department of Energy's instructions provided at: http://www.energy.gov/oe/downloads/national-congestion-study-notice-public-comment-federal- register-notice-volume-79-no, find attached Southern Companies' comments regarding the draft Transmission National Electric Congestion Study that

  16. Comments on RFI on Permitting of Transmission Lines Available...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    On October 5, 2011, the White House announced the creation of a Rapid Response Team for Transmission (RRTT). In support of the RRTT the Department of Energy's Office of...

  17. Department of Energy Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors

    Broader source: Energy.gov [DOE]

    The Department has decided that, prior to issuing a report that designates any national interest electric transmission corridor, the Department will first issue any designation that it is considering in draft form, so as to allow additional opportunities for review and comment by affected States, regional entities, and the general public.

  18. Comments of San Diego Gas & Electric Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    submits these comments in response to the above-enumerated Request for Information noticed by the Department on May 11, 2010. SDG&E is a regulated electric and gas utility operating pursuant to authorities granted to it by the Federal Energy Regulatory Commission and the State of California. SDG&E serves 3.4 million consumers in the San Diego and southern Orange County areas of California via 1.4 million electric meters and 830,000 gas meters. SDG&E's sister company, the Southern

  19. Comments of San Diego Gas & Electric Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    files these comments in response to the above-enumerated Request for Information noticed by the Department on May 11, 2010. SDG&E is a regulated public electric and gas utility operating pursuant to authorities granted to it by the Federal Energy Regulatory Commission and the State of California. SDG&E serves 3.4 million consumers in the San Diego and southern Orange County areas of California via 1.4 million electric meters and 830,000 gas meters. SDG&E's sister company, the

  20. Microsoft Word - Transmission - DOE lead agency NOPR - Final EEI comments 2-24-12

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February 24, 2012 Mr. Brian Mills Office of Electricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Submitted via email to: Brian.Mills@hq.doe.gov Re: Coordination of Federal Authorizations for Electric Transmission Facilities, Notice of Proposed Rulemaking, RIN 1901-AB18, 76 Fed. Reg. 77432 (Dec. 13, 2011) Dear Mr. Mills: I. INTRODUCTION The Edison Electric Institute (EEI) is pleased to provide these comments to the

  1. NBP RFI: Data Access, Third Party Use, and Privacy- Comments of Oncor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electric Deliverty Company LLC | Department of Energy Use, and Privacy- Comments of Oncor Electric Deliverty Company LLC NBP RFI: Data Access, Third Party Use, and Privacy- Comments of Oncor Electric Deliverty Company LLC Oncor Electric Delivery Company LLC (Oncor) is a regulated electric transmission and distribution utility that serves the north-central, eastern and western parts of Texas, including the cities of Dallas and Fort Worth. Oncor operates the largest electric transmission and

  2. To: U.S. Department of Energy From: San Diego Gas & Electric Company

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Via email To: U.S. Department of Energy From: San Diego Gas & Electric Company Date: October 17, 2014 Comments of San Diego Gas & Electric Company on the Department of Energy's National Electric Transmission Congestion Study - Draft for Public Comment I. Introduction On August 19, 2014, the Department of Energy ("Department") issued a Notice 1 inviting public comment on the draft National Electric Transmission Congestion Study. 2 The Draft Study is the third congestion study

  3. Comments by the American Electric Power System on Proposed Coordination of Federal Authorizations for Electric Transmission Facilities

    Broader source: Energy.gov [DOE]

     Proposed Coordination of Federal Authorizations for Electric Transmission Facilities – Interim Final Rule and Proposed Rule (DOE, 10 CR Part 900): The utility operating companies of the American...

  4. Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-08-27

    Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or

  5. Comments on Notice of Proposed Rulemaking for Coordination of Federal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Authorizations for Electric Transmission Facilities | Department of Energy on Notice of Proposed Rulemaking for Coordination of Federal Authorizations for Electric Transmission Facilities Comments on Notice of Proposed Rulemaking for Coordination of Federal Authorizations for Electric Transmission Facilities On behalf of Allegheny Energy, Inc. and its subsidiaries, Monongahela Power Company, The Potomac Edison Company and West Penn Power Company, all doing business as Allegheny Power;

  6. From: Martin Meyer To: Congestion Study Comments Subject: National Interest Electric Transmission Corridors (NIETC"s)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Martin Meyer To: Congestion Study Comments Subject: National Interest Electric Transmission Corridors (NIETC"s) Date: Friday, September 19, 2014 2:10:18 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. Current public easements already exist. ROW for transportation and easements for other publically regulated utilities could be made to cooperate on placement of their infrastructure within these existing routes before

  7. QER- Comment of Sempra Energy 2

    Broader source: Energy.gov [DOE]

    Sempra Energy, on behalf of its subsidiaries, San Diego Gas and Electric Company (SDG&E), Southern California Gas Company, (SoCalGas) and Sempra U.S. Gas & Power1, respectfully submit the attached comments to the Department of Energy. The attached document provides Sempra Energy’s comments regarding the U.S. Department of Energy’s Quadrennial Energy review meeting on natural gas transmission, storage and distribution.

  8. Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Karen Skurka

    Broader source: Energy.gov [DOE]

    Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

  9. Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Fran Buteau

    Broader source: Energy.gov [DOE]

    Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

  10. Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Larry Rappaport

    Broader source: Energy.gov [DOE]

    Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

  11. PP-420 Nogales Transmission L.L.C.- Comment from Nogales-Santa Cruz County Chamber of Commerce Visitor & Tourism Center

    Broader source: Energy.gov [DOE]

    Public comment from the Nogales-Santa Cruz County Chamber of Commerce on the Nogales Interconnection Project to construct, operate and maintain electric transmission facilities at the U.S. - Mexico...

  12. Plains & Eastern Clean Line Transmission Line- Part 2 Application: Comments Received on the Updated Application

    Broader source: Energy.gov [DOE]

    In December 2014, DOE requested additional information from Clean Line Energy Partners, LLC to supplement and update its original Plains and Eastern Clean Line application. The updated Part 2 application and other documentation were available for a public comment period that closed on July 13, 2015. Comments were posted as they were received.

  13. From: Tunnell, Andrew To: Congestion Study Comments Subject:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RE: Southern Companies" Comments to Draft National Electric Transmission Congestion Study Date: Monday, October 20, 2014 3:28:05 PM Attachments: DOE Congestion Comments.pdf I'm resending the comments described below as I did not receive any confirmation email. Please contact me at the number provided below if there is anything else that needs to be done in this regard. Thanks Andrew Tunnell From: Tunnell, Andrew Sent: Monday, October 20, 2014 2:17 PM To:

  14. Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Roy Stever

    Broader source: Energy.gov [DOE]

    Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada  Border.

  15. EIS-0032: 500 kV International Transmission Line NSP-TR-1, Forbes, Minnesota to Manitoba, Canada, Northern States Power Company

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration developed this EIS to evaluate the environmental impacts of a 500-kilovolt transmission line proposed by the Northern States Power Company to provide a transmission facility for the exchange of electrical energy between Canada and the United States.

  16. Comments

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comments by the Energy Storage Association to the Department of Energy Electricity Advisory Council March 13, 2014 Good afternoon. My name is Katherine Hamilton and I serve as Policy Director for the Energy Storage Association, an international trade association that was established over 20 years ago to foster the development of energy storage technologies. Since then our mission has been the promotion, development and commercialization of competitive and reliable energy storage delivery systems

  17. From: Alex Free To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    05:34 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undo burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. Second, I believe that condemning private property for transmission lines in one state to transport electricity to another is a violation of property rights

  18. From: Alex Free To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10:45 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undo burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. Second, I believe that condemning private property for transmission lines in one state to transport electricity to another is a violation of property rights

  19. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  20. 2006 National Electric Transmission Congestion Study Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

  1. From: Mary Mauch To: Congestion Study Comments Subject:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mary Mauch To: Congestion Study Comments Subject: Comments on NEITC and Congestion Study Date: Friday, October 03, 2014 5:07:39 PM I am vehemently opposed to NEITCs- under any guise. Until we have exhausted all alternatives, such as local distributed generation, it is ludicrous and wrong to take private, productive, non-renewable land for unnecessary transmission corridors- probably being lobbied for by private companies for private gain. "Clean" Line Energy Partners and their 14 LLC's

  2. Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from National Park Service- Wendy Jannsen

    Broader source: Energy.gov [DOE]

    Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

  3. Rheem Comments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rheem Comments Rheem Comments These comments are submitted by Rheem Manufacturing Company in response to the U.S. Department of Energy's (DOE) notice appearing in the December 5, 2011 Federal Register requesting information on existing regulations that should be modified, streamlined, expanded, or repealed. DOE Comments - Regulatory Burden RFI (377.96 KB) More Documents & Publications DOE Comments Regulatory Burden RFI Fourth RFI Comment on Regulatory Review Reducing Regulatory Burden EO

  4. Regulatory Burden RFI from Bodine Electric Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bodine Electric Company Regulatory Burden RFI from Bodine Electric Company The following is a response from Bodine Electric Company on unnecessarily burdensome regulations involving Energy Conservation Standards for Small Electric Vehicles. Bodine Electric Company Comment.PDF (33.6 KB) More Documents & Publications Consumer Electronics Association Comments Consumer Electronics Association Comment Regulatory Burden RFI from AHRI

  5. Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick

    SciTech Connect (OSTI)

    1993-10-01

    This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

  6. From: Mills, Pamela To: Congestion Study Comments Cc: Strack, Jan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mills, Pamela To: Congestion Study Comments Cc: Strack, Jan Subject: National Electric Transmission Congestion Study - Draft for Public Comment Date: Friday, October 17, 2014 6:18:37 PM Attachments: SDGE Comments on the National Electric Transmission Congestion Study - Draft for Public Comment.docx Please find attached SDG&E's comments on the National Electric Transmission Congestion Study - Draft for Public Comment. Any questions or comments regarding the attached document should be

  7. NBP RFI: Data Access, Third Party Use, and Privacy- Comments...

    Office of Environmental Management (EM)

    Use, and Privacy- Comments of Oncor Electric Deliverty Company LLC NBP RFI: Data Access, ... NBP RFI: Data Access, Third Party Use, and Privacy- Comments of Oncor Electric Deliverty ...

  8. Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations

    Broader source: Energy.gov [DOE]

    An announcement extending the public comment period for submitting comments regarding the IIP Process was published in the Federal Register on September 25, 2013. Comments must be received on or before October 31, 2013.

  9. NBP RFI: Communications Requirements- Comments of Baltimore Gas & Electric

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Company | Department of Energy Baltimore Gas & Electric Company NBP RFI: Communications Requirements- Comments of Baltimore Gas & Electric Company Comments of Baltimore Gas & Electric Company on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy NBP RFI: Communications Requirements- Comments of Baltimore Gas & Electric Company (105.16 KB) More Documents & Publications Comments of

  10. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  11. QER- Comment of National Resource Defense Council

    Office of Energy Efficiency and Renewable Energy (EERE)

    Please accept this paper as a comment into the QER record on siting energy and transmission resources.

  12. Comments from the City of Alexandria in Support of the Comments...

    Broader source: Energy.gov (indexed) [DOE]

    transmission outages of the 230kV transmission lines that serve the Potomac River Substation on January 9, 2006. Comments from the City of Alexandria in Support of the Comments ...

  13. From: Carol Munson Ross To: Congestion Study Comments Subject...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Munson Ross To: Congestion Study Comments Subject: comment Date: Monday, October 06, 2014 ... Transmission Corridors. Thank you, Carol Munson Ross 22696 Osage Brunswick, MO 65236

  14. Extension of Comment Period on the Draft Integrated, Interagency...

    Energy Savers [EERE]

    of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations Extension of Comment...

  15. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild...

    Energy Savers [EERE]

    Colorado. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project Public Comment Opportunities No public comment opportunities available at this time....

  16. Updating the Electric Grid: An Introduction to Non-Transmission...

    Energy Savers [EERE]

    Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating ... October 17, 2012 QER - Comment of Energy Innovation 1 QER - Comment of ...

  17. National Electric Transmission Congestion Study - Draft for Public...

    Office of Environmental Management (EM)

    - Draft for Public Comment August 2014 National Electric Transmission Congestion Study - Draft for Public Comment August 2014 On August 19, 2014, the Department issued a Federal...

  18. Transmission SEAB Presentation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation (584.95 KB) More Documents & Publications Before House Natural Resources Committee QER - Comment of American Public Power Association 5 Before the House Committee on Natural Resources

  19. Comments from the Virginia Department of Environmental Quality...

    Energy Savers [EERE]

    transmission outages of the 230kV transmission lines that serve the Potomac River Substation on January 9, 2006. Comments from the Virginia Department of Environmental Quality ...

  20. From: Deb Long To: Congestion Study Comments Subject:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Deb Long To: Congestion Study Comments Subject: Transmission lines Date: Friday, September ... Transmission Corridors. Thank you, Deborah Long 25271 Hwy 11 Brunswick, Missouri 65236 ...

  1. Motion to Intervene Out of Time and Comments of FirstEnergy Service...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Motion to Intervene Out of Time and Comments of FirstEnergy Service Company PP-230-3 Motion to Intervene Out of Time and Comments of FirstEnergy Service Company PDF icon Motion to ...

  2. Public Comment Opportunities | Department of Energy

    Energy Savers [EERE]

    and Saguaro, Arizona substations. EIS-0463: Northern Pass Transmission Line Project, New Hampshire Draft EIS and Supplement to the Draft EIS: Public Comment Periods End 1416...

  3. Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500-kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada, Northern States Power Company. Addendum to the final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

  4. PP-89 Bangor-Electric Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PP-82 Vermont Electric Power Company, Inc. (VELCO) Application for Presidental Permit OE Docket No. PP-230-4 International Transmission Company: Settlement Agreement PP-92 El Paso ...

  5. PP-66 Citizens Utilities Company | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Citizens Utilities Company to construct, operate, and maintain transmission facilities at the U.S. - Canada Border. PDF icon PP-66 Citizens Utilities Company More Documents & ...

  6. PP-80 Citizens Utility Company | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Citizens Utility Company to construct, opertate, and maintain transmission facilities at the U.S. - Canada Border. PDF icon PP-80 Citizens Utility Company More Documents & ...

  7. PP-231 Northern States Power Company | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Northern States Power Company to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border. PDF icon PP-231 Northern States Power Company More ...

  8. PP-43 Maine Electric Power Company, Inc. | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Maine Electric Power Company, Inc. to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PDF icon PP-43 Maine Electric Power Company, ...

  9. PP-78 Minnesota Power & Light Company | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Minnesota Power & Light Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PDF icon PP-78 Minnesota Power & Light Company ...

  10. National Electric Transmission Congestion Study 2012 Eastern Workshops

    Office of Environmental Management (EM)

    August 2014 | Department of Energy - Draft for Public Comment August 2014 National Electric Transmission Congestion Study - Draft for Public Comment August 2014 On August 19, 2014, the Department issued a Federal Register Notice announcing the availability of a draft of its National Electric Transmission Congestion Study for public comment. The draft study is available below for review and downloading. The public comment period closed on October 20, 2014. Comments have been posted online.

  11. Comments from the City of Alexandria in Support of the Comments from the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages | Department of Energy from the City of Alexandria in Support of the Comments from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages Comments from the City of Alexandria in Support of the Comments from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages Docket No.

  12. EIS-0067: 230-kV International Transmission Line San Diego County, California to Tijuana, Mexico, San Diego Gas and Electric Company

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration and the California Public Utilities Commission jointly prepared this EIS to evaluate the environmental impacts of the construction, maintenance and operation of a 10-mile, 230-kilovolt transmission line across the U.S./Mexico border for the purpose of economic exchange of power and increased reliability.

  13. NBP RFI: Communications Requirements- Comments of Baltimore Gas...

    Energy Savers [EERE]

    Electric Utilities to Inform Federal Smart Grid Policy PDF icon NBP RFI: Communications Requirements- Comments of Baltimore Gas & Electric Company More Documents & Publications ...

  14. NAESCO Comments on Reducing Regulatory Burden RFI Final

    Office of Energy Efficiency and Renewable Energy (EERE)

    The National Association of Energy Service Companies (NAESCO) appreciates the opportunity to submit these comments in response to the Request for Information (RFI) entitled, “Reducing Regulatory...

  15. DOE Comments Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comments Regulatory Burden RFI DOE Comments Regulatory Burden RFI These comments are submitted by Rheem Manufacturing Company in response to the U.S. Department of Energy's (DOE) notice appearing in the December 5, 2011 Federal Register requesting information on existing regulations that should be modified, streamlined, expanded, or repealed. Reg_Review_DOE_comts_RFI.pdf (55.91 KB) More Documents & Publications Rheem Comments Fourth RFI Comment on Regulatory Review Reducing Regulatory Burden

  16. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Energy Savers [EERE]

    Reply Comments Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Reply Comments Reply Comments of International Transmission Company in ...

  17. PP-40 Citizens Utilities Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon PP-40 Citizens Utilities Company More Documents & Publications PP-66 Citizens Utilities Company PP-48-3 El Paso Eelctric Company PP-76 The Vermont Electric Transmission

  18. NBP RFI: Data Access, Third Party Use and Privacy- Comments of Baltimore

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gas & Electric Company | Department of Energy Use and Privacy- Comments of Baltimore Gas & Electric Company NBP RFI: Data Access, Third Party Use and Privacy- Comments of Baltimore Gas & Electric Company Comments from Baltimore Gas & Electric on DOE Request for Information-Implementing the National Broadband Plan by Empowering Customers and the Smart Grid: Data Access, Third Party Use, and Privacy NBP RFI: Data Access, Third Party Use and Privacy- Comments of Baltimore Gas

  19. PP-62 Central Maine Power Company

    Broader source: Energy.gov [DOE]

    Presidential Permit authorizing Central Maine Power Company to construct, operate, and maintain transmission facilities at the U.S. -Ca nada Border.

  20. PP-12 Maine Public Service Company

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing Maine Public Service Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border.

  1. PP-22 British Columbia Electric Company, Limited

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing British Columbia Electric Company, Limited to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border.

  2. PP-99 St. Clair Tunnel Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 St. Clair Tunnel Company PP-99 St. Clair Tunnel Company Presidential Permit authorizong St. Clair Tunnel Company to construct, operate,a nd maintain eelctric transmission facilities at the U.S. - Canada Border PP-99 St. Clair Tunnel Company (1.08 MB) More Documents & Publications PP-48-3 El Paso Eelctric Company PP-90-1 Imperial Irrigation District PP-76 The Vermont Electric Transmission Company

  3. CA IOUs Comment Letter

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    June 19, 2012 Mr. Daniel Cohen U.S. Department of Energy Office of the General Council 1000 Independence Avenue, SW., Room 6A245 Washington, DC 20585-0121 Dear Mr. Cohen: This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. The signatories of this

  4. Comments from the Virginia Department of Environmental Quality on PEPCO's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intention to Commence Planned Transmission Outages | Department of Energy from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages Comments from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages Docket No. EO-05-01. Comments from the Virginia Department of Environmental Quality on PEPCO's intention to commence planned transmission outages of the 230kV transmission lines

  5. Company Questionnaire

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Technical Assistance » Superior Energy Performance » Companies with SEP-Certified Facilities Win Energy Management Awards Companies with SEP-Certified Facilities Win Energy Management Awards June 3, 2016 - 4:10pm Addthis Companies with SEP-Certified Facilities Win Energy Management Awards Cummins, Inc. is one of only three companies worldwide to win the 2016 Award of Excellence in Energy Management from the Clean Energy Ministerial (CEM), an active forum of energy

  6. QER- Comment of Sempra Energy 1

    Office of Energy Efficiency and Renewable Energy (EERE)

    Sempra Energy, on behalf of its subsidiaries, San Diego Gas and Electric Company (SDG&E), Southern California Gas Company, (SoCalGas) and Sempra U.S. Gas & Power, respectfully submit the attached comments to the Department of Energy. The attached document provides Sempra Energy’s comments regarding the U.S. Department of Energy’s Quadrennial Energy review meeting on electricity transportation, distribution and storage in the west.

  7. QER- Comment of Sempra Energy 3

    Broader source: Energy.gov [DOE]

    Sempra Energy, on behalf of its subsidiaries, San Diego Gas and Electric Company (SDG&E), Southern California Gas Company, (SoCalGas) and Sempra U.S. Gas & Power1, respectfully submit the attached comments to the Department of Energy. The attached document provides Sempra Energy’s comments regarding the U.S. Department of Energy’s Quadrennial Energy review meeting on natural gas and electricity interdependence.

  8. Proposed amendment for Presidential Permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada Northern States Power Company. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Northern States Power Company, (NSP), a Minnesota investor owned utility has applied to the Office of Fossil Energy, United States Department of Energy, to amend Presidential Permit PP-63 to allow for alterations to the 500 kV transmission line and as sedated facilities currently regulated by this permit. The alterations proposed for the 500 kV line owned by NSP are part of a long term effort sponsored by NSP to upgrade the existing NSP transmission system to allow for increased exchange of electricity with the Manitoba Hydro-Electric Board. Presidential Permit PP-63 authorized NSP to construct, connect, operate and maintain a 500 kV line at the United States/Canadian border approximately seven-and-a-half miles west of Warroad in Roseau County, Minnesota. This line connects with a 500 kV line owned and operated by the Manitoba Hydro-Electric Board (MHEB), which extends from Dorsey, Manitoba, Canada to the United States/Canadian border. NSP proposes to increase the electricity transfer capability of this transmission facility by constructing a new 80-acre substation on the existing 500 kV line in Roseau County, Minnesota, and upgrading the existing substation at Forbes, Minnesota. The proposed Roseau substation would contain two 41.5 ohm series capacitor banks. In addition, static VAR compensators are to be installed at the existing Forbes Substation. Approximately 5 acres would be added to the 30-acre Forbes site to house the additional equipment. No new lines would enter or exit the facility. NSP proposes to place the new Roseau Substation in service in May 1993 and to complete the upgrading of the Forbes Substation in March 1994. The primary, initial purpose of these modifications is to enable NSP to import 400 megawatts of electric power from MHEB during the summer months to meet peak electrical demand in the Minneapolis-St. Paul area. It is expected that this power transfer would begin in 1993.

  9. QER - Comment of Energy Innovation 1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 QER - Comment of Energy Innovation 1 From: Hallie Kennan [hallie@energyinnovation.org] Sent: Friday, July 18, 2014 4:19 PM To: QERcomments CC: Sonia Aggarwal Subject: Comment on the QER Public Meeting: Electricity Transmission, Storage and Distribution Attachment: APP-DER-PAPER.pdf; APP-DG-PAPER.pdf; APP-TRANSMISSION-PAPER.pdf Hello, Please accept these papers as comments into the QER record for the July 11th public meeting on electricity transmission, storage, and distribution. Thank you,

  10. QER- Comment of John Woolsey 2

    Broader source: Energy.gov [DOE]

    Hello Ms. Wayland--- I have three comments regarding the development of energy infrastructure in the United States: 1) NATIVE, NON-RENEWABLE ENERGY RESOURCES SHOULD NOT BE MADE AVAILABLE FOR EXPORT IN LARGE QUANTITIES. Small or limited amounts could be permissible, but not in large, ongoing quantities since we will obviously need it for our own use. We have been given a reprieve in that we have discovered new ways to make the most of what we have; let us not squander it through exports. If other countries wish to sell energy to us, that is their call. 2) NEITHER PUBLIC FUNDS NOR PUBLIC EMINENT DOMAIN POWERS SHOULD BE USED TO CONSTRUCT TRANSMISSION FACILITIES ON BEHALF OF PRIVATE ENERGY COMPANIES WISHING TO EXPORT NON-RENEWABLE ENERGY RESOURCES. 3) NEW ENERGY TRANSMISSION FACILITIES SHOULD BE ROUTED ALONG EXISTING RIGHTS-OF-WAY OR ALONG EXISTING PUBLIC USE CORRIDORS AND NOT THROUGH LESS DEVELOPED, RURAL OR WILDERNESS AREAS. Small and rural communities should not be taken advantage of merely because the real estate is less expensive. Just as the public would not tolerate a transmission corridor through a national park, neither is it beneficial to disfigure small towns and rural landscapes with utility rights-of-way. State parks and large, undivided tracts of conservation land also serve the public interest, and will continue to do so long after the transmitted energy has run out. Sincerely, John M Woolsey

  11. Notice of Extension of Public Comment Period for Application...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension of Public Comment Period for Application for Proposed Project for Clean Line Plains & Eastern Transmission Line: Federal Register Notice, Volume 80, No. 116 - Jun. 17, ...

  12. From: Joyce Crommett To: Congestion Study Comments Subject:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Crommett To: Congestion Study Comments Subject: Private property rights Date: Friday, ... Second, I believe that condemning private property for transmission lines in one state to ...

  13. Comments Received on Proposed Rulemaking for regulation implementing...

    Office of Environmental Management (EM)

    for regulation implementing section 216(h): Coordination of Federal Transmission Permitting on Federal Lands Comments Received on Proposed Rulemaking for regulation ...

  14. Comments on Notice of Proposed Rulemaking for Coordination of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Notice of Proposed Rulemaking for Coordination of Federal Authorizations for Electric Transmission Facilities Comments on Notice of Proposed Rulemaking for Coordination of...

  15. From: Cameron Foreman To: Congestion Study Comments Subject:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cameron Foreman To: Congestion Study Comments Subject: Nietc Date: Tuesday, September 23, ... Interest Energy Transmission Corridors. Cameron Foreman 643 church street Rush Hill, mo ...

  16. PUBLIC COMMENT ON FEDERAL REGISTER - DOE IS BUSH CHENEY SCUM...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SCUM COUNTRY THESE DAYS - WE NEED A CHANGE OF PERSONNELFW: more expoxsure to the ... Renewable Energy. Plains and Eastern Clean Line Transmission Line: Comment from Marshall ...

  17. From: Angie Smith To: Congestion Study Comments Subject: Please...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Angie Smith To: Congestion Study Comments Subject: Please Read Date: Sunday, September 21, ... Transmission Corridors. Thank you, Angie Smith 2800 Palmyra Rd 555 Hannibal, MO 63401

  18. 2006 National Electric Transmission Congestion Study and Related...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Congestion Study and Related Materials 2006 National Electric Transmission ... Comments and form letters were submitted by the public in response to this study. National ...

  19. Comments from Congressman James P. Moran, 8th District of Virginia

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supporting the Comments from the City of Alexandria on PEPCO's Intention to Commence Planned Transmission Outages | Department of Energy from Congressman James P. Moran, 8th District of Virginia Supporting the Comments from the City of Alexandria on PEPCO's Intention to Commence Planned Transmission Outages Comments from Congressman James P. Moran, 8th District of Virginia Supporting the Comments from the City of Alexandria on PEPCO's Intention to Commence Planned Transmission Outages Docket

  20. UNITED STATES OF AMERICA DEPARTMENT OF ENERGY National Electric Transmission Congestion Study )

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DEPARTMENT OF ENERGY National Electric Transmission Congestion Study ) COMMENTS OF THE NEW YORK INDEPENDENT SYSTEM OPERATOR I. Introduction and Overarching Comments The New York Independent System Operator ("NYISO") 1 respectfully submits these comments in response to the Department of Energy's ("DOE," "Department") Public Comment Draft of the National Electric Transmission Congestion Study (the "Study"). 2 In these comments, the NYISO makes

  1. QER- Comment of Cynthia Henshaw

    Broader source: Energy.gov [DOE]

    Hello, I have several comments regarding the hearing and document put together regarding infrastructure constraints in New England. 1. Why did the document not discuss the waste and losses of natural gas through existing pipeline leaks? The most cost-effective carbon savings within New England is to repair existing natural gas leaks. If we invested our dollars to upgrade existing transmission, storage and distribution capacity in New England we would not need additional gas pipelines and we'd help protect out health and the environment. These infrastructure improvements should be completed before creating more environmental damage and disruption to additional communities. 2. The best way to encourage investment in infrastructure that will address vulnerabilities is to encourage local energy production - continue to expand local solar panel use (on houses, store roofs and larger systems) and encourage continued development of alternative wind turbines that do not have the environmental and community impacts as the large turbines so that they can be cited near the electric demand. We need to take responsibility for the energy that we use. That means understanding how to generate our own electricity, and promoting conservation and energy efficiency throughout New England. 3. Tennessee Gas is proposing a new gas pipeline across the northern tier of Massachusetts. Why are they not expanding their existing infrastructure that already runs across the southern tier of the state? They already have the rights-of-way and infrastructure in place. The company has not been forthcoming with answers, which sows seeds of distrust. If the company, and federal and state regulators want to increase pipeline capacity then answers to reasonable questions need to be given. AND the public needs to have more than ONE WEEK to provide questions. 4. The Tennessee Gas Pipeline proposed for the northern tier of Massachusetts targets existing conservation infrastructure that was protected for a

  2. QER- Comment of PSEG Services Corporation

    Broader source: Energy.gov [DOE]

    Attached please find the comments and responses of the PSEG Companies (Public Service Electric and Gas Company, PSEG Power LLC and PSEG Long Island LLC) to the questions raised by the U.S. Department of Energy. Should you have any questions or problems regarding the attached document, please do not hesitate to contact me.

  3. QER- Comment of Marcellus Shale Coalition

    Broader source: Energy.gov [DOE]

    Attached please find the Marcellus Shale Coalition’s comments with regard to the U.S. Department of Energy’s Quadrennial Energy Review Task Force Hearing - Natural Gas Transmission, Storage and Distribution. Thank you

  4. QER- Comment of Meyil Engineering Company

    Office of Energy Efficiency and Renewable Energy (EERE)

    Dear Sirs, We, as a Meyil Engineering Co. Ltd., with its headquarters and factory located in Ostim industrial zone in Ankara, manufacture concrete batching plants. Brief information about our Concrete Batching Plants is enclosed to this email. Meyil's products group includes stationary and mobile plants, wet and dry mix plants, compact and complicated plants with planetary, singleshaft and twinshaft mixer choices.

  5. QER- Comment of Hyundai Motor Company

    Broader source: Energy.gov [DOE]

    Karen Thank you for getting back to us – please don’t hesitate to contact us if you have any questions or need any additional input

  6. Bodine Electric Company Comment.PDF

    Office of Environmental Management (EM)

    Annual Update BioenergizeME Infographic Challenge Annual Update Annual Update for the BioenergizeME Infographic Challenge. 2016_annual_update.pdf (512.49 KB) More Documents & Publications Webinar: BioenergizeME Office Hours Webinar: Guide to the 2016 BioenergizeME Infographic Challenge BioenergizeME Infographic Challenge Flyer BioenergizeME Infographic Challenge Toolkit

    Flyer BioenergizeME Infographic Challenge Flyer Flyers for the BioenergizeME Infographic Challenge can be downloaded in

  7. Customer Comments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2009) Customer Comments on 2009 PTSA Avista Utilities BPA Power Services Grant County PUD Horizon Wind Energy Iberdrola Renewables Northwest Requirements Utilities Powerex...

  8. Customer Comments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Service Customer Comments Customer Response to July 24August 8 Forums N.Wasco County PUD (08262013) Portland General Electric (08262013) Renewable Northwest Project (0826...

  9. Customer Comments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Customer Comments BPA Power (452012) Clark PUD (452012) Cowlitz PUD (452012) Emerald PUD (452012) Franklin PUD (452012) Grant PUD (452012) Iberdrola (452012)...

  10. NBP RFI: Data Access, Third Party Use and Privacy- Comments of...

    Office of Environmental Management (EM)

    Use and Privacy- Comments of Baltimore Gas & Electric Company NBP RFI: Data Access, Third ... Empowering Customers and the Smart Grid: Data Access, Third Party Use, and Privacy NBP ...

  11. Michigan Electric Transmission Company | Open Energy Information

    Open Energy Info (EERE)

    Michigan Office: (269) 792-7223 -- Northern Michigan Office: (989) 671-0616 Website: www.itc-holdings.comitc-michi Twitter: @ITCGrid Facebook: https:www.facebook.com...

  12. PP-317 AEP Texas Central Company | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AEP Texas Central Company to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border. PDF icon PP-317 AEP Texas Central Company More Documents & ...

  13. QER- Comment of Mitsubishi Electric

    Broader source: Energy.gov [DOE]

    Dear Karen: On behalf of Brian Heery, president and CEO of Mitsubishi Electric Power Products, attached are comments regarding the Quadrennial Energy Review. As a US-based manufacturer of large transformers and other energy infrastructure technologies, we welcome the opportunity to meet with you on issues affecting the Nations transmission grid.

  14. Microsoft Word - 201-007658 - CS Public Comment draft 12Aug2014 incl OMB CI chgs lbnl khl.docx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft for Public Comment National Electric Transmission Congestion Study August 2014 United States Department of Energy Washington, DC 20585 Department of Energy | August 2014 National Electric Transmission Congestion Study | Page ii How to File Comments on This Draft Study This draft study has been released for public comment for a period of 60 days. The comment period will close at 5 p.m. Eastern Daylight Time, October 20, 2014. After the close of the public comment period, the Department of

  15. From: Stolar, Olena To: Congestion Study Comments Subject: NextEra...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stolar, Olena To: Congestion Study Comments Subject: NextEra Energy Inc."s Comments on the DOE Draft National Electric Transmission Congestion Study submitted on behalf of Joseph...

  16. DOE/EIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOEEIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension DOEEIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension Northern Pass Transmission...

  17. DOE Grid Tech Team Issues Request for Public Comments on Workshop Summaries

    Broader source: Energy.gov [DOE]

    DOE's Grid Tech Team issued a notice of availability and request for comments on the Electrical Grid Integration Technical Workshop summaries. Public comments on summaries from the distribution system and transmission system workshops will be accepted until March 25, 2013.

  18. PP-48-3 El Paso Eelctric Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8-3 El Paso Eelctric Company PP-48-3 El Paso Eelctric Company Presidential Permit authorizing El Paso Eelctric Company to construct, operate, and maintain electric transmission ...

  19. PP-22 British Columbia Electric Company, Limited, Amendment 1957

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing British Columbia Electric Company, Limited to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border.

  20. PP-45-2 Northern States Power Company

    Broader source: Energy.gov [DOE]

    Presidential Permit authorizing Northern States Power Company to construct, operate, and maintain elextric transmission facilities at the U.S. - Canada Border.

  1. PP-106 Arizona Public Service Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presidential permit authorizing Arizona Public Service Company to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border. PDF icon PP-106 ...

  2. PP-107 Arizona Public Service Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presidential permit authorizing Arizona Public Service Company to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border. PDF icon PP-107 ...

  3. PP-45-1 Northern States Power Company

    Broader source: Energy.gov [DOE]

    Presidential Permit authorizing Northern States Power Company to construct, operate, and maintain elextric transmission facilities at the U.S. - Canada Border.

  4. Southern Company Services, Inc. Smart Grid Project | Open Energy...

    Open Energy Info (EERE)

    Company) Smart Grid project involves integrated upgrades of the distribution, transmission, and grid management systems throughout their large service territory. Major...

  5. Shanghai Municipal Electric Power Company SMEPC | Open Energy...

    Open Energy Info (EERE)

    Shanghai Municipal Electric Power Company is a large enterprise engaging in Shanghai electric power transmission, distribution and sales. Coordinates: 31.247709,...

  6. PP-221 Detroit Edison Company | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Permit authorizing Detroit Edison Company to construct, operate and maintain electric transmission facilities at the U.S. - Canada border. PDF icon PP-221 Detroit.pdf More ...

  7. PP-228 Edison Sault Electric Company | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Permit authorizing Edison Sault Electric Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PDF icon PP-228 Edison Sault ...

  8. PP-29-1 Maine Public Service Company

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing Maine Public Service Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border.

  9. PP-82 Vermont Electric Power Company, Inc. (VELCO)

    Broader source: Energy.gov [DOE]

    Presidental Permit authorizing Vermont Electric Power Company, Inc. (VELCO) to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border.

  10. PP-22-1 British Columbia Electric Company, Limited

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing British Columbia Electric Company, Limited to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border.

  11. EIS-0486: DOE Notice of Public Comment Period Extension | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Public Comment Period Extension EIS-0486: DOE Notice of Public Comment Period Extension Plains & Eastern Clean Line Transmission Project DOE is extending the public comment period for the Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project (DOE/EIS-0486) to April 20, 2015. Comments submitted to DOE concerning the Plains & Eastern EIS prior to this announcement do not need to be resubmitted as a result of this extension of the

  12. EIS-0486: EPA Notice of Public Comment Period Extension | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Public Comment Period Extension EIS-0486: EPA Notice of Public Comment Period Extension Plains & Eastern Clean Line Transmission Project EPA announces that the DOE is extending the public comment period for the Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project (DOE/EIS-0486) to April 20, 2015. Comments submitted to DOE concerning the Plains & Eastern EIS prior to this announcement do not need to be resubmitted as a result of this

  13. From: Susan Sack To: Congestion Study Comments Subject:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Susan Sack To: Congestion Study Comments Subject: comment regarding transmission corridors Date: Saturday, September 20, 2014 3:48:24 PM I oppose energy corridors for several reasons. Technology is progressing quickly and overhead transmission lines create hazards for citizens and take valuable irreplaceable farmable land out production. The cost to land owners through devaluation of property is huge and impedes on land owner rights. Long haul transmission is a knee jerk speculative reaction not

  14. Page comments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    with-serial-codes-on-login-nodesPageComment101 http:www.nersc.govuserssoftwarecompilersintel-fortran-c-and-cintel-bug-reportsintel-uses-very-old-version-of-libstdc-by-de...

  15. COMMENTS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COMMENTS� COMMENTS� COMMENTS� (52.93 KB) More Documents & Publications COMMENTS� Microsoft Word - Appendix A_2006_Jun CHAPTER 7 FINANCIAL MANAGEMENT

  16. National transmission grid study

    SciTech Connect (OSTI)

    Abraham, Spencer

    2003-05-31

    The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE’s Policy Office Electricity Modeling System (POEMS). DOE’s analysis, presented in Section 2, confirms the central role of the nation’s transmission system in lowering costs to consumers through increased trade. More importantly, DOE’s analysis also confirms the results of previous studies, which show that transmission bottlenecks and related transmission system market practices are adding hundreds of millions of dollars to consumers’ electricity bills each year. A more detailed technical overview of the use of POEMS is provided in Appendix A. DOE led an extensive, open, public input process and heard a wide range of comments and recommendations that have all been considered.1 More than 150 participants registered for three public workshops held in Detroit, MI (September 24, 2001); Atlanta, GA (September 26, 2001); and Phoenix, AZ (September 28, 2001).

  17. Smart Grid RFI: Addressing Policy and Logistical Challenges, Comments from

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Edison Electric Institute | Department of Energy Challenges, Comments from the Edison Electric Institute Smart Grid RFI: Addressing Policy and Logistical Challenges, Comments from the Edison Electric Institute The Edison Electric Institute ("EEI"), on behalf of its member companies, hereby submits the following comments in response to the request by the Department of Energy ("DOE" or "Department") for information on a wide range of issues dealing with Smart

  18. SunZia Southwest Transmission Project Comments

    Broader source: Energy.gov (indexed) [DOE]

    able to gain access to electricity markets and customers in ... terminus will provide power transfer paths to markets ... LLC; Shell WindEnergy, LLC; Salt River Agricultural ...

  19. FINAL CA IOU Comment Letter RFI Regulatory Burden | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FINAL CA IOU Comment Letter RFI Regulatory Burden FINAL CA IOU Comment Letter RFI Regulatory Burden This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. FINAL_CA_IOU_comment_letter.pdf (464.44 KB) More Documents & Publications Comments on Docket

  20. Customer Comments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

  1. Ontario Power Generation Motion to Intervene & Comments in FE Docket No. 99-1

    Broader source: Energy.gov [DOE]

    Ontario Power Generation hereby moves to intervene in, and comments on, the DOE's proposed open access requirements for International Electric Transmission Facilities.

  2. Comments from the Virginia Department of Environmental Quality...

    Broader source: Energy.gov (indexed) [DOE]

    Quality (DEQ) strongly opposes the Potomac Electric Power Company's (PEPCO) intention to commence planned maintenance outages of the 230kV transmission lines that serve the ...

  3. 2009 National Electric Transmission Congestion Study Workshops | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Transmission Planning » Congestion Studies » 2009 Congestion Study » 2009 National Electric Transmission Congestion Study Workshops 2009 National Electric Transmission Congestion Study Workshops DOE hosted six regional pre-study workshops in mid-2008 to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study, including comments on practical metrics for gauging levels and significance of transmission congestion. Each workshop featured a

  4. National Congestion Study Notice of Public Comment: Federal Register

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice, Volume 79, No. 160, August 19, 2014 | Department of Energy Congestion Study Notice of Public Comment: Federal Register Notice, Volume 79, No. 160, August 19, 2014 National Congestion Study Notice of Public Comment: Federal Register Notice, Volume 79, No. 160, August 19, 2014 On August 19, 2014, the Department issued a Federal Register Notice announcing the availability of a draft of its current National Electric Transmission Congestion Study for public comment. The Notice is

  5. QER - Comment of Energy Innovation 8 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 QER - Comment of Energy Innovation 8 From: Hallie Kennan [hallie@energyinnovation.org] Sent: Friday, July 18, 2014 4:42 PM To: QERcomments CC: Sonia Aggarwal Subject: Comment on the QER Public Meeting in Iowa: Rural Electrification, Biomass Processing and Transportation Attachment: APP-DER-PAPER.pdf; APP-DG-PAPER.pdf; APP-TRANSMISSION-PAPER.pdf Hello, Please accept these papers as comments into the QER record for the public meeting on rural electrification, biomass processing and

  6. Customer Comments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Utilities PNGC Power Public Power Council Renewable Northwest Project Snohomish PUD Wheatridge Wind EnergySwaggart Energy Transmission Western Montana Electric Generating...

  7. QER- Comment of PA Chamber of Business and Industry

    Broader source: Energy.gov [DOE]

    On behalf of Gene Barr, President & CEO of the Pennsylvania Chamber of Business and Industry, please find attached our comments regarding Natural Gas Transmission, Storage & Distribution, Pittsburgh, Pennsylvania July 21, 2014. Thanks in advance for the attention to our comments and for holding a hearing today in our state. All the best, Kevin

  8. From: MCKEOWN D To: Congestion Study Comments Date:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MCKEOWN D To: Congestion Study Comments Date: Friday, September 19, 2014 2:18:11 AM I am ... Energy Transmission Corridors. Thank you, Mary McKeown 3502 Highway M Moberly, MO 65270

  9. Mr. Rod Beever, Retrospective Review Comment.pdf

    Office of Environmental Management (EM)

    0, 2014 Mr. David Meyer Office of Electricity Delivery and Energy Reliability (OE), U.S. Department of Energy 1000 Independence Avenue SW Washington, DC 20585 Re: Comments on draft National Electric Transmission Congestion Study Dear Mr. Meyer: Clean Line Energy Partners LLC ("Clean Line") appreciates the opportunity to provide comments on the draft National Electric Transmission Congestion Study ("Draft Study"), published by the U.S. Department of Energy ("DOE") in

  10. From: CELIA DANIELS To: Congestion Study Comments Subject:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CELIA DANIELS To: Congestion Study Comments Subject: NIETC comment Date: Friday, September 19, 2014 2:25:17 PM Greetings: I would like to express my opposition to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First and foremost, the same landowners should not have to endure the problems and hazards of the construction of transmission lines on their land again and again. We have suffered through the building of three pipelines on our

  11. Infrastructure Needs: Natural Gas/Electricity Transmission,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Through our six operating companies, Eversource operates over 4,300 miles of transmission lines, 72,000 miles of distribution lines, and 6,500 miles of natural gas pipelines. ...

  12. COMMENTS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COMMENTS� COMMENTS� COMMENTS� (64.91 KB) More Documents & Publications CHAPTER 7 FINANCIAL MANAGEMENT Microsoft Word - CHAP02ESH _REVISED1_3.doc CHAPTER 3

  13. PP-219 Central Power and Light Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    19 Central Power and Light Company PP-219 Central Power and Light Company Presidential permit authorizing Central Power and Light Company to construct, operate, and maintain electric transmission facilities at the U.S-Mexican border. PP-219 Central Power and Light Company (946.17 KB) More Documents & Publications PP-234-1 Baja California Power Inc PP-234 Baja California Power Inc PP-16 Alendatory Permit

  14. BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-08-01

    Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

  15. National Electric Transmission Congestion Studies

    Office of Energy Efficiency and Renewable Energy (EERE)

    Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to include in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmission capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor).

  16. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Energy Savers [EERE]

    Transmission Company: Reply Comments Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of New York Transmission Owners to ITC

  17. Public Comments in Response to the November 10, 2011 Federal Register Notice

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department issued a Federal Register Notice initiating preparations for development of the current National Electric Transmission Congestion Study. DOE requested comments on what publicly-available data and information should be considered, and what types of analysis should be performed to identify and understand the significance and character of transmission congestion. The following public comments were received as of March 30, 2012.

  18. Transmission Workshop

    Broader source: Energy.gov [DOE]

    On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC.

  19. Transmission Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Grid Tech Team U.S. Department of Energy DOE Grid Tech Team (GTT) The Grid Tech Team ... regional diversity, AC-DC transmission and distribution solutions, ...

  20. Application for presidential permit OE Docket No. PP-230-4 International

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Company: Comments of the Midwest Independent Transmission System Operator | Department of Energy Midwest Independent Transmission System Operator Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Midwest Independent Transmission System Operator Comments of the Midwest Independent Transmission System Operaton on the application from International Transmission Company to construct, operate, and maintain electric

  1. PP-6 Puget Sound Power & Light Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Puget Sound Power & Light Company PP-6 Puget Sound Power & Light Company Presidential permit authorizing Puget Sound Power & Light Company to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. - Signed 4/28/1981 PP-6 Puget Sound Power & Light Company (1.07 MB) More Documents & Publications PP-29-1 Maine Public Service Company PP-12 Maine Public Service Company PP-10 Bonneville Power Administrator

  2. From: Turner, Carmelita To: Congestion Study Comments Subject:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Turner, Carmelita To: Congestion Study Comments Subject: Comments on draft National Electric Transmission Congestion Study Date: Monday, October 20, 2014 1:37:19 PM Attachments: WIRES-NEMA Comment on DOE 2014 Congestion Study 10-20.docx Attached please find the components of WIRES NEMA Comment on Department of Energy. Please direct any questions to Jim Hoecker, below. James J. Hoecker Attorney HUSCH BLACKWELL LLP 750 17th St., NW, Suite 900 Washington, D.C. 20006-4656 Direct: 202.378.2316 Fax:

  3. Transmission decisions

    SciTech Connect (OSTI)

    Ellison, C.T. )

    1993-03-01

    As the US FERC moves forward to implement the transmission access provisions of the National Energy Policy Act of 1992, the debate over Regional Transmission Groups continues. Independent energy producers have much at stake in this debate and their reaction to the general RTG concept and to specific RTG proposals will weigh heavily in determining the fate of these proposals.

  4. Open Access Transmission and Renewable Energy Technologies

    SciTech Connect (OSTI)

    Porter, K.

    1996-09-01

    In April 1996, the Federal Regulatory Commission (PERC) approved Orders 888 and 889 and released a draft rule for public comment on capacity reservation tariffs (CRTs). Order No. 888 requires electric utilities to file transmission tariffs that would allow transmission access to third parties who want to conduct wholesale transactions, and Order No. 889 requires transmission-owning utilities to set up open access, same-time information systems (OASIS), using commercial software and Internet protocols. This paper discusses these Orders in detail, as well as some of the issues before FERC with implications for renewables, which include: transmission pricing; transmission terms and conditions; reassignment of transmission capacity; defining state and FERC jurisdiction over transmission and distribution; the pricing of ancillary services; and the adoption and implementation of independent system operators.

  5. Coordination of Federal Authorizations for Electric Transmission Facilities: Federal Register Notice Volume 73, No. 183- Sep. 19, 2008

    Broader source: Energy.gov [DOE]

    Federal Register Notice of proposed rulemaking and opportunity for comment on the coordination of federal authorizations for electric transmission facilities, September 19, 2008

  6. 150122 Traxys DOE RFI Comments

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TRAXYS RESPONSES to DOE'S RFI ON EXCESS URANIUM MANAGEMENT Summary Statements based on Traxys' contracts and EIA Form 858 Filings: 1. Traxys is a primary, direct participant in the sale and introduction to market of the majority of DOE's excess uranium sales via a contractual relationship with Fluor B&W Portsmouth (FBP) to purchase and monetize all the UF6 it receives from DOE for services. Based on this unique position, Traxys is the only company that can factually comment and have actual

  7. Regional Transmission Projects: Finding Solutions

    SciTech Connect (OSTI)

    The Keystone Center

    2005-06-15

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association

  8. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Energy Savers [EERE]

    Comments from NYISO Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Comments from NYISO Comments of the New York Independent System ...

  9. QER- Comment of American Public Power Association 6

    Broader source: Energy.gov [DOE]

    To whom it may concern: Please find attached comments jointly filed by the American Public Power Association, Large Public Power Council, and Transmission Access Policy Study Group, in relation to the issues discussed at the October 6, 2014, QER Public Stakeholder Meeting on Finance (Transmission, Storage and Distribution).

  10. Application for presidential permit OE Docket No. PP-230-4 International

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator | Department of Energy Supplemental Comments of the Midwest Independent Transmission System Operator Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator Supplemental comments of the Midwest Independent Transmission System Operaton on the application from International

  11. Response from PEPCO to the Comments from the Virginia Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages | Department of Energy PEPCO to the Comments from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages Response from PEPCO to the Comments from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages Docket No. EO-05-01. Order No. 202-05-03: This letter responds to the allegations of the letter

  12. Notice of Extension of Public Comment Period for Application for Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project for Clean Line Plains & Eastern Transmission Line: Federal Register Notice, Volume 80, No. 116 - Jun. 17, 2015 | Department of Energy Extension of Public Comment Period for Application for Proposed Project for Clean Line Plains & Eastern Transmission Line: Federal Register Notice, Volume 80, No. 116 - Jun. 17, 2015 Notice of Extension of Public Comment Period for Application for Proposed Project for Clean Line Plains & Eastern Transmission Line: Federal Register Notice,

  13. Application for Presidential Permit OE Docket No. PP-059 Central Power and Light Company (CPL)

    Broader source: Energy.gov [DOE]

    Application from Central Power and Light Company (CPL) to construct, operate and maintain electric transmission facilities at the U.S. - Mexico Border

  14. PP-107-1 Arizona Public Service Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presidential permit authorizing Arizona Public Service Company to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border. PDF icon PP-107-1 ...

  15. PP-63-1 Northern States Power Company (NSP) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    authorizing Northern States Power Company (NSP) to construct, operate, and maintain transmission facilities at the U.S. - Canada Border PDF icon PP-63-1

  16. PP-63-2 Northern States Power Company (NSP) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Authorizing Northern States Power Company (NSP) to construct, operate, and maintain transmission facilities at the U.S. - Canada Border. PDF icon PP-63-2

  17. PP-81 The Maine Pubplic Service Company (MPS) | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    The Maine Pubplic Service Company (MPS) to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PDF icon PP-81 The Maine Pubplic Service ...

  18. Application for presidential permit OE Docket No. PP-230-4 International

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Company: Reply Comments | Department of Energy Reply Comments Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Reply Comments Reply Comments of International Transmission Company in reference to application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border. PP-230-4 International Transmission Company (140.4 KB) More Documents & Publications

  19. Potomac Electric Power Company's Motion for Leave to Answer and Answer to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comments and Protests | Department of Energy for Leave to Answer and Answer to Comments and Protests Potomac Electric Power Company's Motion for Leave to Answer and Answer to Comments and Protests Docket No. EO-05-01: Pursuant to Rules 212 and 213 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or the "Commission"), 18 C.F.R. §§ 385.212 and 385.213 (2005), Potomac Electric Power Company ("Pepco") hereby (i) moves for

  20. DOE/EIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy DOE/EIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension DOE/EIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension Northern Pass Transmission Line Project, New Hampshire EPA announces that DOE has extended the public comment period for the Draft Environmental Impact Statement for the Northern Pass Transmission Line Project (DOE/EIS-0463) to April 4, 2016. Comments submitted to DOE concerning the Northern Pass Draft EIS prior to this

  1. From: Eric Lovelace To: Congestion Study Comments Subject:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Eric Lovelace To: Congestion Study Comments Subject: Opposition to the establishment of National Interest Energy Transmission Corridors (NIETC"s) Date: Wednesday, October 08, 2014 6:25:37 PM Dear Sir or Madam: I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undo burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible

  2. Comments Received on the Coordination of Federal Authorizations for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electric Transmission Facilities Notice of Proposed Rulemaking (NOPR) for the Integrated Interagency Pre-Application (IIP) Process | Department of Energy Received on the Coordination of Federal Authorizations for Electric Transmission Facilities Notice of Proposed Rulemaking (NOPR) for the Integrated Interagency Pre-Application (IIP) Process Comments Received on the Coordination of Federal Authorizations for Electric Transmission Facilities Notice of Proposed Rulemaking (NOPR) for the

  3. Comments Received on Proposed Rulemaking for regulation implementing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    section 216(h): Coordination of Federal Transmission Permitting on Federal Lands | Department of Energy Received on Proposed Rulemaking for regulation implementing section 216(h): Coordination of Federal Transmission Permitting on Federal Lands Comments Received on Proposed Rulemaking for regulation implementing section 216(h): Coordination of Federal Transmission Permitting on Federal Lands Section 1221(a) of EPAct 2005, which added section 216(h) to the Federal Power Act, stated that the

  4. Comment Period Closed Explained

    Broader source: Energy.gov [DOE]

    The public comment period on the Draft Environmental Impact Statement (EIS) has ended, and DOE is preparing a Final EIS. The Final EIS will consider and respond to all timely public comments on the...

  5. Transmission Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Services BPA Clarifications on the DSO216 1 Document updated on 2242015 at 3:29:25 PM B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Clarifications on...

  6. Transmission Planning

    Broader source: Energy.gov [DOE]

    The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security.

  7. QER- Comment of WIRES

    Office of Energy Efficiency and Renewable Energy (EERE)

    Attached please find the components of WIRES Comment to the QER. Please direct any questions to Jim Hoecker, below.

  8. Submitting Comments via Email

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Submitting Comments via Email Any contact information provided in your e-mail submission will not be publicly viewable except for your first and last names, organization name (if any), and submitter representative name (if any). Your contact information will be publicly viewable if you include it in the comment itself or in any documents attached to your comment. Any information that you do not want to be publicly viewable should not be included in your comment, nor in any document attached to

  9. Public Comments on the Request for Information on Rapid Response Teams for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission (April 2012) | Department of Energy on the Request for Information on Rapid Response Teams for Transmission (April 2012) Public Comments on the Request for Information on Rapid Response Teams for Transmission (April 2012) On February 27, 2012, the Department issued a Federal Register Notice seeking information on questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve

  10. Company Level Imports Archives

    U.S. Energy Information Administration (EIA) Indexed Site

    Company Level Imports Company Level Imports Archives 2015 Imports by Month January XLS February XLS March XLS April XLS May XLS June XLS July XLS August XLS September XLS October...

  11. Capital Reporting Company Quadrennial ...

    Broader source: Energy.gov (indexed) [DOE]

    Capital Reporting Company Quadrennial Energy Review Meeting No. 4 06-19-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ...

  12. Federal Register Notice: Plan for Conduct of 2012 Electric Transmission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Congestion Study | Department of Energy Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study November 10, 2011 - 1:42pm Addthis The Department has issued a Federal Register Notice initiating preparations for development of the 2012 National Electric Transmission Congestion Study. The Department is seeking comments on what publicly-available data and information should

  13. 2006 National Electric Transmission Congestion Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate

  14. 2009 National Electric Transmission Congestion Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate

  15. Dairyland Power Cooperative Comments on Smart Grid RFI: Addressing Policy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Logistical Challenges | Department of Energy Comments on Smart Grid RFI: Addressing Policy and Logistical Challenges Dairyland Power Cooperative Comments on Smart Grid RFI: Addressing Policy and Logistical Challenges Dairyland Power Cooperative is a generation and transmission cooperative (G&T) that provides the wholesale electrical requirements and other services for 25 electric distribution cooperatives and 16 municipal utilities in the Upper Midwest. Smart Grid RFI: Addressing

  16. QER- Comment of Tate Sullivan

    Broader source: Energy.gov [DOE]

    Thank you. From: QERcomments [mailto:QERcomments@Hq.Doe.Gov] Sent: Thursday, May 29, 2014 4:14 PM To: Tate Sullivan, CLSA Subject: RE: QER Public Meeting: Petroleum Product Transmission & Distribution Tate, You can find the panelists' statements and other information, including a link to a video of meetings when available, at www.energy.gov/qer. We will post transcripts for all meetings, which will include the facilitated discussion and any public comments given during the open mic, on the same website in the weeks following each meeting. All comments we receive through this email will eventually become public, but not until later this fall. Regards, Karen Karen G. Wayland, Ph.D. Deputy Director for State, Local and Tribal Cooperation Energy Policy and Systems Analysis U.S. Department of Energy 1000 Independence Ave. SW Washington, DC 20585 From: Tate Sullivan, CLSA Sent: Wednesday, May 28, 2014 10:47 AM To: QERcomments Subject: QER Public Meeting: Petroleum Product Transmission & Distribution Are any of the presentations or comments during this public meeting going to be released in electronic form? Have they been released? Is there a replay available of the event? Thank you. Tate Sullivan, CFA CLSA Americas, LLC Vice President CLSA is committed to reducing consumption for a better environment and is ISO14001 certified. The content of this communication is subject to CLSA Legal and Regulatory Notices These can be viewed at https://www.clsa.com/disclaimer.html or sent to you upon request. CLSA is committed to reducing consumption for a better environment and is ISO14001 certified. The content of this communication is subject to CLSA Legal and Regulatory Notices These can be viewed at https://www.clsa.com/disclaimer.html or sent to you upon request.

  17. Application for presidential permit OE Docket No. PP-230-4 International

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Company: Comments of The Detriot Edison Company | Department of Energy presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of The Detriot Edison Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of The Detriot Edison Company The Detriot Edison Company hereby submits these comments and a motion in the alternative for leave to intervene out of time in response to the January 5, 2009

  18. EA-1880: Notice of Public Comment Period Extension | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Notice of Public Comment Period Extension EA-1880: Notice of Public Comment Period Extension Big Bend to Witten Transmission Line, South Dakota The USDA Rural Utilities Service extended the public comment period for the draft EA it issued on January 28, 2015 to March 30, 2015. For more information on this project, including actions that DOE's Western Area Power Administration proposes as part of this proposed Project, see the project webpage:

  19. From: Dave Ulery To: Congestion Study Comments Subject: 2014 Congestion Study Comment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dave Ulery To: Congestion Study Comments Subject: 2014 Congestion Study Comment... Date: Sunday, October 19, 2014 8:15:09 PM First, I feel like I should point out an obvious error in your study report. Unless the plan has changed without anyone knowing about it, the Plains and Eastern Clean Line would be 3,500mW, not 7,000mW as was referenced in the report: "The Plains & Eastern Line is a 7,000 MW capacity, 800-mile line planned by transmission merchant Clean Line Energy that would

  20. Application for Presidential permit OE Docket No. PP-230-4 International

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Company: Comments and Supplemental Documents | Department of Energy permit OE Docket No. PP-230-4 International Transmission Company: Comments and Supplemental Documents Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments and Supplemental Documents PP-230-4 ITC (FR Notice) Applied 01/05/2009 ITC (Application) ITC (comments of Midwest ISO) ITC (Supplemental Comments of Midwest ISO) ITC (comments of NYISO) ITC (comments of IESO)

  1. DOE/EIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period...

    Office of Environmental Management (EM)

    DOEEIS-0463 and EIS-0463-S1: EPA Notice of Public Comment Period Extension Northern Pass Transmission Line Project, New Hampshire EPA announces that DOE has extended the public ...

  2. From: Maryellen H. McVicker To: Congestion Study Comments Subject...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maryellen H. McVicker To: Congestion Study Comments Subject: National Interest Electric Transmission Corridors Date: Monday, September 22, 2014 5:41:37 PM I oppose the transfer of ...

  3. Notice of extension of public comment period for reply comments...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of extension of public comment period for reply comments. On July 27, 2010, the ... incidents.The NOI provided a September 27, 2010, deadline for comments, which was ...

  4. Transmission | Department of Energy

    Energy Savers [EERE]

    resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on...

  5. Transmission Business Line

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Business Line Non-Federal Financing of Transmission Projects - March 2004 Critical paths on the Northwest transmission grid are congested and the system is near or at...

  6. Green Power Transmission Line Given New Life | Department of...

    Office of Environmental Management (EM)

    The transmission line should generate about 150 construction jobs and 50 to 75 green jobs directly related to the wind energy companies, which have secured space for their wind ...

  7. Storage & Transmission Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & ...

  8. Energy Service Companies

    Broader source: Energy.gov [DOE]

    Energy service companies (ESCOs) develop, design, build, and fund projects that save energy, reduce energy costs, decrease operations and maintenance costs at their customers' facilities.

  9. Potomac Electric Power Company's Motion to Intervene and Comment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Docket No. EO-05-01. Docket No. EL05-145-000: Pursuant to Rules 211 and 214 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or the ...

  10. CRA Comments & Responses

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CRA Comments & Responses Home CRA - 2004 Final Recertification Decision CRA Comments & Responses CCA - 1996 CRA CARDs & TSDs CCA CARDs & TSDs Regulatory Tools Completeness Determination-Related Correspondence All EPA & DOE correspondence related to the determination of completeness and the CRA are provided below. Letter Transmitting EPA's CRA Completeness Determination (9/29/05) Notification of Completeness Determination EPA Letter # Subject 1 CRA Comments (5/20/04)