1

FPL's Christmas 1991 transmission outages  

SciTech Connect (OSTI)

A record number of contamination related outages occurred on FPL transmission lines during Christmas of 1991 and resulted in an investigation of inservice insulator performance. The field investigation process used was enhanced by recent improvements in outage data recording. Also used in the analysis were weather information, the results of recently completed accelerated aging tests of polymers, and specially conducted tests on the effects of weathering steel stain on porcelain insulators. Specific insulator problems were identified and actions taken to reduce the possibility of recurrence.

Burnham, J.T.; Busch, D.W.; Renowden, J.D. (Florida Power Light Co., Juno Beach, FL (United States). Transmission Line Dept.)

1993-10-01T23:59:59.000Z

2

IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS--II: EXPRESS BRIEFS, VOL. 55, NO. 9, SEPTEMBER 2008 927 Using Transmission Line Outage Data to  

E-Print Network [OSTI]

Using Transmission Line Outage Data to Estimate Cascading Failure Propagation in an Electric Power transmission line outages recorded over nine years in an electric power system with approx- imately 200 lines. The average amount of propagation of the line outages is estimated from the data. The distribution

Dobson, Ian

3

Copyright 2008 IEEE. Reprinted from Hui Ren, Student Member, IEEE and Ian Dobson, Fellow, IEEE; Using Transmission Line Outage Data to Estimate Cascading Failure Propagation in an  

E-Print Network [OSTI]

; Using Transmission Line Outage Data to Estimate Cascading Failure Propagation in an Electric Power ON CIRCUITS AND SYSTEMS--II: EXPRESS BRIEFS, VOL. 55, NO. 9, SEPTEMBER 2008 927 Using Transmission Line Outage, IEEE, and Ian Dobson, Fellow, IEEE Abstract--We study cascading transmission line outages recorded over

4

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

5

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

6

Number and propagation of line outages in cascading events in electric power transmission systems  

E-Print Network [OSTI]

Number and propagation of line outages in cascading events in electric power transmission systems of transmission lines. We estimate from observed utility data how transmission line outages propagate, and obtain of transmission lines. The multiple mechanisms involved these cascading outages are many and varied, and the power

Dobson, Ian

7

Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages |  

Broader source: Energy.gov (indexed) [DOE]

Further Notice of 230kV Circuit Planned Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Pursuant to the United States Department of Energy Order No. 202-05-03, issued December 20, 2005 directing Mirant Potomac River to generate electricity at Potomac River Generating Station, PEPCO hereby files this Further Notice of 230kV Circuit Planned Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages More Documents & Publications Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Re: Potomac River Generating Station Department of Energy Case No.

8

On PMU Location Selection for Line Outage Detection in Wide-area Transmission Networks  

E-Print Network [OSTI]

1 On PMU Location Selection for Line Outage Detection in Wide-area Transmission Networks Yue Zhao locations to collect voltage phase angle measurements for detecting line outages in wide-area transmission measurements. Index Terms--Phasor measurement unit, location selection, outage detection, transmission networks

Zhao, Yue

9

Transmission Line Circuit Alexander Glasser  

E-Print Network [OSTI]

Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

Anlage, Steven

10

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

11

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

12

Potomac River Project Outage Schedule Clarification | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Notification of Planned 230kV Outage at Potomac River Generating Station PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the

13

Potomac River Project Outage Schedule Clarification | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

River Project Outage Schedule Clarification River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

14

Definition: Sustained Outage | Open Energy Information  

Open Energy Info (EERE)

Sustained Outage Sustained Outage Jump to: navigation, search Dictionary.png Sustained Outage The deenergized condition of a transmission line resulting from a fault or disturbance following an unsuccessful automatic reclosing sequence and/or unsuccessful manual reclosing procedure.[1] View on Wikipedia Wikipedia Definition A power outage (also power cut, blackout, or power failure) is a short- or long-term loss of the electric power to an area. There are many causes of power failures in an electricity network. Examples of these causes include faults at power stations, damage to electric transmission lines, substations or other parts of the distribution system, a short circuit, or the overloading of electricity mains. Power failures are particularly critical at sites where the environment and public safety are

15

Optimized Waveform Relaxation Solution of RLCG Transmission Line Type Circuits  

E-Print Network [OSTI]

Optimized Waveform Relaxation Solution of RLCG Transmission Line Type Circuits Mohammad D. Al to transmission line circuit problems based on the longitudinal partitioning into segments. This greatly improves the convergence for strongly coupled RLCG transmission line (TL) type circuits. The method can be applied to other

Gander, Martin J.

16

Comments from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages  

Broader source: Energy.gov (indexed) [DOE]

COMMONWEALTH of VIRGINIA COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY Street address: 629 East Main Street, Richmond, Virginia 23219 Mailing address: P.O. Box 10009, Richmond, Virginia 23240 Fax (804) 698-4500 TDD (804) 698-4021 www.deq.virginia.gov W. Tayloe Murphy, Jr. Secretary of Natural Resources Robert G. Burnley Director (804) 698-4000 1-800-592-5482 January 5, 2006 The Honorable Samuel W. Bodman Secretary of Energy United States Department of Energy 1000 Independence Avenue, S.W. Washington, D.C. 20585 Re: District of Columbia Public Service Commission Docket No. EO-05-01 Dear Secretary Bodman: The Virginia Department of Environmental Quality (DEQ) strongly opposes the Potomac Electric Power Company's (PEPCO) intention to commence planned maintenance outages of the

17

Solution of Large Transmission Line Type Circuits Using a New Optimized Waveform Relaxation Partitioning  

E-Print Network [OSTI]

Solution of Large Transmission Line Type Circuits Using a New Optimized Waveform Relaxation. However, so far the partitioning of strongly coupled circuits like transmission lines has been di#cult. We. We analyze convergence for the case of a transmission line type circuit and illustrate the method

Gander, Martin J.

18

Multimode circuit QED with hybrid metamaterial transmission lines  

E-Print Network [OSTI]

Quantum transmission lines are a central to superconducting and hybrid quantum computing. Parallel to these developments are those of left-handed meta-materials. They have a wide variety of applications in photonics from the microwave to the visible range such as invisibility cloaks and perfect flat lenses. For classical guided microwaves, left-handed transmission lines have been proposed and studied on the macroscopic scale. We combine these ideas in presenting a left-handed/right-handed hybrid transmission line for applications in quantum optics on a chip. The resulting system allows circuit QED to reach a new regime: multi-mode ultra-strong coupling. Out of the many potential applications of this novel device, we discuss two; the preparation of multipartite entangled states and its use as a quantum simulator for the spin-boson model where a quantum phase transition is reached up to finite size-effects.

Daniel J. Egger; Frank K. Wilhelm

2013-02-22T23:59:59.000Z

19

AN INFINITE DIMENSIONAL DESCRIPTOR SYSTEM MODEL FOR ELECTRICAL CIRCUITS WITH TRANSMISSION LINES  

E-Print Network [OSTI]

AN INFINITE DIMENSIONAL DESCRIPTOR SYSTEM MODEL FOR ELECTRICAL CIRCUITS WITH TRANSMISSION LINES TIMO REIS Abstract. In this paper a model of linear electrical circuits with transmission lines is de-coupled with the telegraph equations who describe the behavior of the transmission lines. The resulting system of equations

Reis, Timo

20

ECEN 720 High-Speed Links Circuits and Systems Lab1 -Transmission Lines  

E-Print Network [OSTI]

1 ECEN 720 High-Speed Links Circuits and Systems Lab1 - Transmission Lines Objective To learn transmission lines and time-domain refectometer (TDR). Introduction Wires are used to transmit clocks and data data communication chip design, the wires are often treated as transmission lines. Proper transmission

Palermo, Sam

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Definition: Forced Outage | Open Energy Information  

Open Energy Info (EERE)

Forced Outage Forced Outage Jump to: navigation, search Dictionary.png Forced Outage The removal from service availability of a generating unit, transmission line, or other facility for emergency reasons., The condition in which the equipment is unavailable due to unanticipated failure.[1] Related Terms transmission lines, transmission line References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Forced_Outage&oldid=480310" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties About us Disclaimers Energy blogs Linked Data

22

ECEN 720 High-Speed Links: Circuits and Systems Lab1 -Transmission Lines  

E-Print Network [OSTI]

1 ECEN 720 High-Speed Links: Circuits and Systems Lab1 - Transmission Lines Objective To learn about transmission lines and time-domain reflectometer (TDR). Introduction Wires are used to transmit. In high speed data communication chip design, the wires are often treated as transmission lines. Proper

Palermo, Sam

23

North American Electric Reliability Council Power Outage Update |  

Broader source: Energy.gov (indexed) [DOE]

Power Outage Update Power Outage Update North American Electric Reliability Council Power Outage Update The bulk electric transmission system in the United States and Canada has been restored and is operating reliably. Many of the generating units that tripped off line during the outage have returned to service and additional generating units are expected to return to service over the weekend. Virtually all customers have been returned to electric service, although some customers will continue to experience rotating outages due to generating capacity availability. North American Electric Reliability Council Power Outage Update More Documents & Publications Electric System Update: Sunday August 17, 2003 North American Electric Reliability Council Outage Announcement NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report

24

August 14, 2003 Power Outages … Announcement  

Broader source: Energy.gov (indexed) [DOE]

Ellen P. Vancko Ellen P. Vancko evancko@nerc.com Power Outage Update ⎯ 8/16/2003 11 a.m. EDT The bulk electric transmission system in the United States and Canada has been restored and is operating reliably. Many of the generating units that tripped off line during the outage have returned to service and additional generating units are expected to return to service over the weekend. Virtually all customers have been returned to electric service, although some customers will continue to experience rotating outages due to generating capacity availability. Some rotating outages may also be necessary on Monday depending on the status of the generating units returning to service and the electrical demand. "NERC is conducting a thorough investigation into this event in conjunction with the regional

25

Notice of Unplanned Outage at the Mirant Potomac River Plant | Department  

Broader source: Energy.gov (indexed) [DOE]

Unplanned Outage at the Mirant Potomac River Plant Unplanned Outage at the Mirant Potomac River Plant Notice of Unplanned Outage at the Mirant Potomac River Plant Docket No. EO-05-01. Order No. 202-05-03: Pursuant to the United States Department of Energy ("DOE") Order No_ 202-05-3, issued December 20, 2005 ("DOE Potomac River Order"), Pepco hereby files this notice of an unplanned outage of one of the 230kV circuits serving the Potomac River Substation, and through that station, the District of Columbia. Notice of Unplanned Outage at the Mirant Potomac River Plant More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Further Notice of 230kV Circuit Planned Outages

26

Outage Probability Analysis for Asynchronous Cognitive Radio Networks  

E-Print Network [OSTI]

and the secondary network co-exist. Solid lines and dashed lines represent the data transmissionOutage Probability Analysis for Asynchronous Cognitive Radio Networks Chulhee Jang and Jae Hong Lee network in a spectrum sharing asynchronous cognitive radio (CR) network. We analyze the outage probability

Lee, Jae Hong

27

Definition: Cascading Outage | Open Energy Information  

Open Energy Info (EERE)

Cascading Outage Cascading Outage Jump to: navigation, search Dictionary.png Cascading Outage The uncontrolled successive loss of system elements triggered by an incident at any location. Cascading results in widespread electric service interruption that cannot be restrained from sequentially spreading beyond an area predetermined by studies.[1] View on Wikipedia Wikipedia Definition A cascading failure is a failure in a system of interconnected parts in which the failure of a part can trigger the failure of successive parts. Such a failure may happen in many types of systems, including power transmission, computer networking, finance and bridges. Cascading failures usually begin when one part of the system fails. When this happens, nearby nodes must then take up the slack for the failed component. This overloads

28

Repair duration effects on distribution system reliability indices and customer outage costs.  

E-Print Network [OSTI]

??The distribution system is part of the electric power system that links the bulk transmission system and the individual customers. Approximately 80 percent of outages (more)

Shakya, Binendra

2013-01-01T23:59:59.000Z

29

Contingency Analysis of Cascading Line Outage Events  

SciTech Connect (OSTI)

As the US power systems continue to increase in size and complexity, including the growth of smart grids, larger blackouts due to cascading outages become more likely. Grid congestion is often associated with a cascading collapse leading to a major blackout. Such a collapse is characterized by a self-sustaining sequence of line outages followed by a topology breakup of the network. This paper addresses the implementation and testing of a process for N-k contingency analysis and sequential cascading outage simulation in order to identify potential cascading modes. A modeling approach described in this paper offers a unique capability to identify initiating events that may lead to cascading outages. It predicts the development of cascading events by identifying and visualizing potential cascading tiers. The proposed approach was implemented using a 328-bus simplified SERC power system network. The results of the study indicate that initiating events and possible cascading chains may be identified, ranked and visualized. This approach may be used to improve the reliability of a transmission grid and reduce its vulnerability to cascading outages.

Thomas L Baldwin; Magdy S Tawfik; Miles McQueen

2011-03-01T23:59:59.000Z

30

Homeowners: Respond to Power Outages | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Power Outages Power Outages Homeowners: Respond to Power Outages Homeowners: Respond to Power Outages After a disaster, electric utilities and government officials will first work to restore power to critical infrastructure like power plants and transmission lines, water treatment facilities, and telecommunications networks, and also to hospitals, critical care facilities, and emergency response agencies. It may take several days or even weeks to restore power to individual homeowners, but here's what you can do to help prepare and recover power more quickly: Charge mobile devices-If you have power, charge your cell phones, laptops, and other mobile devices so they'll have the maximum amount of battery power stored in the event of a power outage. These devices will help you communicate with your power company, and they'll help you stay

31

Refinery Outages: Fall 2014  

Reports and Publications (EIA)

This report examines refinery outages planned for Fall 2014 and the potential implications for available refinery capacity, petroleum product markets and supply of gasoline and middle distillate fuel oil (diesel, jet fuel, and heating oil). EIA believes that dissemination of such analyses can be beneficial to market participants who may otherwise be unable to access such information.

2014-01-01T23:59:59.000Z

32

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Broader source: Energy.gov (indexed) [DOE]

Notification of Planned 230kV Outage at Potomac River Generating Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned 230kV Outage at Potomac River Generating Station Docket No. EO-05-01. In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of

33

Pinpointing the cause of an outage for something as complex and interconnected as the high voltage transmission system is a ve  

Broader source: Energy.gov (indexed) [DOE]

Ellen P. Vancko Ellen P. Vancko evancko@nerc.com Electric System Update: Sunday August 17, 2003, 5:00 p.m. The electric transmission system is now operating reliably. All electric power transmission lines that were removed from service during the blackout on August 14, 2003, have been returned to service with one exception. The lines between Michigan and Ontario remain out of service due to operational security reasons; however, they are expected to be returned to service later this evening. Most of the electric generating units that were removed from service during the blackout have now been returned to service (the exact number of units that went out of service is not yet known). Twenty-one of these remain out of service. A number of these generating units are expected to return to service either

34

Modelling locational price spreads in competitive electricity markets; applications for transmission rights valuation and replication  

Science Journals Connector (OSTI)

......historical data to calibrate...training data can make...capacity of the transmission line, in megawatts...transmission outages or expansion...training data can make...capacity of the transmission line, in megawatts...transmission outages or expansion......

Petter Skantze; Marija Ilic; Andrej Gubina

2004-10-01T23:59:59.000Z

35

Definition: Reduced Sustained Outages | Open Energy Information  

Open Energy Info (EERE)

Outages Outages Jump to: navigation, search Dictionary.png Reduced Sustained Outages A sustained outage is one lasting >5 minutes, excluding major outages and wide-scale outages. The monetary benefit of reducing sustained outages is based on the value of service (VOS) of each customer class. The VOS parameter represents the total cost of a power outage per MWh. This cost includes the value of unserved energy, lost productivity, collateral damage, administrative costs, the value of penalties and performance-based rates. Functions that lead to this benefit can reduce the likelihood that there will be an outage, allow the system to be reconfigured on the fly to help restore service to as many customers as possible, enable a quicker response in the restoration effort, or mitigate the impact of an outage

36

Preventing power outages Power system contingency analysis on the GPU  

E-Print Network [OSTI]

problem. Moreover, the power system has to keep functioning properly even when a transmission line failsPreventing power outages Power system contingency analysis on the GPU To provide electricity generators, nuclear power plants, wind turbines, etc.) and a network of lines and cables to transmit

Vuik, Kees

37

Notification of Planned 230kV Outage at Potomac River Generating Station  

Broader source: Energy.gov (indexed) [DOE]

Sent: Wednesday, May 16, 2007 4:49 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: This morning Pepco and PJM observed that the generation at the Potomac River Generating Station was having difficulty matching the station generation requirement to the Potomac River area load. Mirant has also informed Pepco and PJM that several generating units were experiencing equipment problems which required them to reduce unit and total plant output. Based on these observations and information received from Mirant, Pepco has elected to cease the current work activities underway on xxxxx high voltage circuit and we will be placing this transmission line back in service this afternoon.

38

The detection, prevention and mitigation of cascading outages in the power system  

E-Print Network [OSTI]

and their neighboring lines . . . . . . . . . . . . . . 96 IX Transmission lines and their thermal limits (in MVA value) . . . . . 104 X Top 6 line outages ranked by vulnerability index and margin index . 105 XI Top 6 line outages ranked by vulnerability index based...116 120 1 CHAPTER I INTRODUCTION A. Problem Statement Electric power system is one of the biggest and most complex man-made sys- tems. It is composed of thousands of generators, transformers, transmission lines, substations, loads and extensive...

Song, Hongbiao

2009-05-15T23:59:59.000Z

39

outages | OpenEI Community  

Open Energy Info (EERE)

66 66 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142234866 Varnish cache server outages Home Graham7781's picture Submitted by Graham7781(2002) Super contributor 29 October, 2012 - 14:46 East Coast Utilities prepare for Hurricane Sandy East Coast Hurricane Sandy OpenEI outages storm United States Utility Companies As Hurricane Sandy continues to track towards the coast of the Eastern United States, utility companies have been preparing for an imminent threat that could lead to a substantial and prolonged power outage for utility

40

Definition: Reduced Major Outages | Open Energy Information  

Open Energy Info (EERE)

Outages Outages Jump to: navigation, search Dictionary.png Reduced Major Outages A major outage is defined using the beta method, per IEEE Std 1366-2003 (IEEE Power Engineering Society 2004). The monetary benefit of reducing major outages is based on the VOS of each customer class. The VOS parameter represents the total cost of a power outage per MWh. This cost includes the value of unserved energy, lost productivity, collateral damage, the value of penalties and performance-based rates. Functions that lead to this benefit can mitigate major outages by allowing the system to be reconfigured on the fly to help restore service to as many customers as possible, enable a quicker response in the restoration effort, or mitigate the impact of an outage through islanding or alternative power supply.[1]

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Definition: Outage Management System | Open Energy Information  

Open Energy Info (EERE)

Outage Management System Outage Management System A software application that can process outage reports from a variety of utility operational systems including SCADA, AMI, and customer phone calls, and display outage information to utility operators. The OMS can help a utility interpret outage information and determine where the likely cause of an outage may be. It can also help the utility optimize its service restoration resources.[1] Related Terms advanced metering infrastructure References ↑ https://www.smartgrid.gov/category/technology/outage_management_system [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Outage_Management_System&oldid=502507

42

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Broader source: Energy.gov (indexed) [DOE]

In accordance with DOE Order No. 202-05-03 Pepco is In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

43

Definition: Reduced Momentary Outages | Open Energy Information  

Open Energy Info (EERE)

Momentary Outages Momentary Outages Jump to: navigation, search Dictionary.png Reduced Momentary Outages By locating faults more accurately or adding electricity storage, momentary outages could be reduced or eliminated. Moreover, fewer customers on the same or adjacent distribution feeders would experience the momentary interruptions associated with reclosing. Momentary outages last <5 min in duration. The benefit to consumers is based on the value of service.[1] Related Terms electricity storage technologies, electricity generation, smart grid References ↑ SmartGrid.gov 'Description of Benefits' An in LikeLike UnlikeLike You like this.Sign Up to see what your friends like. line Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Reduced_Momentary_Outages&oldid=493094

44

Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage  

Broader source: Energy.gov (indexed) [DOE]

May 25, 2007 May 25, 2007 Kevin Kolevar Director of the Office of Electricity Deliverability and Energy Reliability Department of Energy 1000 Independence Ave., SW Washington, DC 20585 Dear Mr. Kolevar, DOE has requested that Pepco provide an update on the current work to install two new 230 kilovolt circuits into Potomac River substation and to evaluate the need for generation from the Potomac River plant to support the anticipated line outage during June, 2007. An outage on one of the 230 kV circuits is currently underway and is currently scheduled to be completed by June 2, 2007. Mirant has supported this outage with generation required to match the Potomac River area load from the substation. This has required the operation of all 5 generating units located at

45

A framework and review of customer outage costs: Integration and analysis of electric utility outage cost surveys  

SciTech Connect (OSTI)

A clear understanding of the monetary value that customers place on reliability and the factors that give rise to higher and lower values is an essential tool in determining investment in the grid. The recent National Transmission Grid Study recognizes the need for this information as one of growing importance for both public and private decision makers. In response, the U.S. Department of Energy has undertaken this study, as a first step toward addressing the current absence of consistent data needed to support better estimates of the economic value of electricity reliability. Twenty-four studies, conducted by eight electric utilities between 1989 and 2002 representing residential and commercial/industrial (small, medium and large) customer groups, were chosen for analysis. The studies cover virtually all of the Southeast, most of the western United States, including California, rural Washington and Oregon, and the Midwest south and east of Chicago. All variables were standardized to a consistent metric and dollar amounts were adjusted to the 2002 CPI. The data were then incorporated into a meta-database in which each outage scenario (e.g., the lost of electric service for one hour on a weekday summer afternoon) is treated as an independent case or record both to permit comparisons between outage characteristics and to increase the statistical power of analysis results. Unadjusted average outage costs and Tobit models that estimate customer damage functions are presented. The customer damage functions express customer outage costs for a given outage scenario and customer class as a function of location, time of day, consumption, and business type. One can use the damage functions to calculate outage costs for specific customer types. For example, using the customer damage functions, the cost experienced by an ''average'' customer resulting from a 1 hour summer afternoon outage is estimated to be approximately $3 for a residential customer, $1,200 for small-medium commercial and industrial customer, and $82,000 for large commercial and industrial customer. Future work to improve the quality and coverage of information on the value of electricity reliability to customers is described.

Lawton, Leora; Sullivan, Michael; Van Liere, Kent; Katz, Aaron; Eto, Joseph

2003-11-01T23:59:59.000Z

46

North American Electric Reliability Council Outage Announcement |  

Broader source: Energy.gov (indexed) [DOE]

Council Outage Announcement Council Outage Announcement North American Electric Reliability Council Outage Announcement Starting at about 4:11 p.m. EDT, major losses of electric load occurred in the northeastern United States and Canada in the Eastern Interconnection. Although the exact cause is not known at present, the outages are not the result of a terrorist attack. The areas most affected center around the Great Lakes: Michigan, Ohio, New York City, Ontario, Quebec, northern New Jersey, Massachusetts, and Connecticut. North American Electric Reliability Council Outage Announcement More Documents & Publications Blackout 2003: Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations Blackout 2003: Blackout Final Implementation Report

47

GUIDELINES FOR IMPLEMENTATION OF AN ADVANCED OUTAGE CONTROL CENTER TO IMPROVE OUTAGE COORDINATION, PROBLEM RESOLUTION, AND OUTAGE RISK MANAGEMENT  

SciTech Connect (OSTI)

This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. Managing NPP outages is a complex and difficult task due to the large number of maintenance and repair activities that are accomplished in a short period of time. During an outage, the outage control center (OCC) is the temporary command center for outage managers and provides several critical functions for the successful execution of the outage schedule. Essentially, the OCC functions to facilitate information inflow, assist outage management in processing information, and to facilitate the dissemination of information to stakeholders. Currently, outage management activities primarily rely on telephone communication, face to face reports of status, and periodic briefings in the OCC. It is a difficult task to maintain current the information related to outage progress and discovered conditions. Several advanced communication and collaboration technologies have shown promise for facilitating the information flow into, across, and out of the OCC. The use of these technologies will allow information to be shared electronically, providing greater amounts of real-time information to the decision makers and allowing OCC coordinators to meet with supporting staff remotely. Passively monitoring status electronically through advances in the areas of mobile worker technologies, computer-based procedures, and automated work packages will reduce the current reliance on manually reporting progress. The use of these technologies will also improve the knowledge capture and management capabilities of the organization. The purpose of this research is to improve management of NPP outages through the development of an advanced outage control center (AOCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This technical report for industry implementation outlines methods and considerations for the establishment of an AOCC. This report provides a process for implementation of a change management plan, evaluation of current outage processes, the selection of technology, and guidance for the implementation of the selected technology. Methods are presented for both adoption of technologies within an existing OCC and for a complete OCC replacement, including human factors considerations for OCC design and setup.

Shawn St. Germain; Ronald Farris; April M. Whaley; Heather Medema; David Gertman

2014-09-01T23:59:59.000Z

48

Systems and Services Outage Notification Policy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Job Logs & Analytics Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Acknowledge NERSC Allocation Eligibility Allocation Management Computer Security Computer Use Data Management Passwords Queue Scheduling Usage Charges System Outages Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov consult@nersc.gov 1-800-66-NERSC, option 3 or 510-486-8611 Home » For Users » Policies » System Outages Systems Outage Notification Policy To be considered a scheduled outage, the user community must be notified of

49

Transmission  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

50

Microsoft Word - 112706 Final Outage Letter PUBLIC.doc  

Broader source: Energy.gov (indexed) [DOE]

CRITICAL ENERGY INFRASTRUCTURE INFORMATION CRITICAL ENERGY INFRASTRUCTURE INFORMATION REMOVED FOR PRIVILEGED TREATMENT November 27, 2006 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Generating Station Department of Energy Case No. EO-05-01 Dear Mr. Mansueti: Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission outages that are scheduled for the upcoming months. In accordance with its internal procedures developed pursuant to the December 20, 2005 order in the captioned proceeding, Order No. 202-05-03 ("December 20 Order"), Pepco will provide

51

Planning considerations for the intermountain HVDC transmission system  

SciTech Connect (OSTI)

Planning of an HVDC transmission system embedded into an existing ac network may require unique control and converter equipment capability in order to satisfy stability requirements of the network. The planning and design of the Intermountain Power Project HVDC transmission system are based on unique control performance features for power transfers during terminal ac faults, rapid power recovery following fault clearing and utilization of exceptionally high transient overload capability of 2 per unit during the post-fault period to maintain system stability. The Department, in its efforts to meet the Western Systems Coordinating Council's (WSCC) reliability criteria, developed and incorporated into its HVDC specifications very rigorous reliability and availability requirements. One objective of this project was to attain the unusually low bipolar converter system outage frequency goal of one outage in five years to achieve a bipole performance rating equivalent to two ac circuits of similar capability. The reliability goals of this project have provided one of the impetus for revisions to the WSCC Reliability Criteria for System Design. The reliability goals and other features adopted for the Intermountain HVDC transmission system are discussed in this paper and study results are included to demonstrate the effectiveness of various controls implemented as stability enhancement techniques.

Lee, R.L.; Beshir, M.J.; Gee, J.H.

1986-01-01T23:59:59.000Z

52

Outage management and health physics issue, 2006  

SciTech Connect (OSTI)

The focus of the May-June issue is on outage management and health physics. Major articles/reports in this issue include: A design with experience for the U.S., by Michael J. Wallace, Constellation Generation Group; Hope to be among the first, by Randy Hutchinson, Entergy Nuclear; Plans to file COLs in 2008, by Garry Miller, Progress Energy; Evolution of ICRP's recommendations, by Lars-Erik Holm, ICRP; European network on education and training in radiological protection, by Michele Coeck, SCK-CEN, Belgium; Outage managment: an important tool for improving nuclear power plant performance, by Thomas Mazour and Jiri Mandula, IAEA, Austria; and Plant profile: Exploring new paths to excellence, by Anne Thomas, Exelon Nuclear.

Agnihotri, Newal (ed.)

2006-05-15T23:59:59.000Z

53

Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities  

SciTech Connect (OSTI)

The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.

Gregory Weatherby

2012-05-01T23:59:59.000Z

54

RESOLVED: Projectb filesystem outage July 9, 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RESOLVED: Projectb filesystem outage July 9, 2012 RESOLVED: Projectb filesystem outage July 9, 2012 RESOLVED: Projectb filesystem outage July 9, 2012 July 9, 2012 (0 Comments) The projectb filesystem had a hardware failure that potentially generated I/O errors. The filesystem logs indicate that the earliest abnormal event on the filesystem occurred at 9:19AM and the filesystem was taken down for maintenance at 10:42AM. The filesystem returned to service at 11:20AM. Jobs running on the cluster would not have been able to read from or write to the projectb filesystem between 10:42AM and 11:20AM. Between 9:19AM and 10:42AM one out of the 20 GPFS controllers on projectb was down, and didn't failover (as it should have). This means: 1/20 file I/O operations could have failed between 9:19AM and 10:42AM If your job was performing a large number of short reads and writes, then

55

Summary of Market Assessment of Upcoming Planned Refinery Outages  

Gasoline and Diesel Fuel Update (EIA)

Summary of Market Assessment of Upcoming Planned Refinery Outages Summary of Market Assessment of Upcoming Planned Refinery Outages Summary of Market Assessment of Upcoming Planned Refinery Outages Market Assessment of Upcoming Planned Refinery Outages, December 2008 - March 2009 reviews planned U.S. refinery outages from December 2008 though March 2009 in order to identify any regions where outages might create enough supply pressure to impact prices significantly. As required under Section 804 of the Energy Independence and Security Act of 2007 (Pub. L. 110-140), this report reviews the supply implications of planned refinery outages for December 2008 through March 2009, which covers the winter period when demand for distillate fuels (diesel and heating oil) is high. As a result, emphasis in this report is on distillate rather than gasoline. Refinery outages are the result of planned maintenance and unplanned outages. Maintenance is usually scheduled during the times when demand is lowest - in the first quarter and again in the fall. Unplanned outages, which occur for many reasons including mechanical failures, fires, and flooding, can occur at any time.

56

Definition: Outage Detection/Reporting | Open Energy Information  

Open Energy Info (EERE)

Outage Detection/Reporting Outage Detection/Reporting Jump to: navigation, search Dictionary.png Outage Detection/Reporting A system utilizing smart meters and AMI that can notify a utility of customer power outages when the power to meters is interrupted. Generally speaking, this can be done by utilizing meters that can send a "last gasp" signal to the head-end system upon losing power, or by periodically polling meters to check status.[1] Related Terms power, advanced metering infrastructure, system References ↑ https://www.smartgrid.gov/category/technology/outage_detectionreporting [[Cat Like Like You like this.Sign Up to see what your friends like. egory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Outage_Detection/Reporting&oldid=502576

57

Microwave and millimeter-wave rectifying circuit arrays and ultra-wideband antennas for wireless power transmission and communications  

E-Print Network [OSTI]

......................................... 78 39. Geometry of the rectenna element, where the gray-lines are the transmission line networks: d = 4.18 mm, l 1 = 1.46 mm, l 2 = 0.9 mm, l 3 = 10 mm, l 4 = 4.83 mm, l 5 = 4.18 mm, and l 6 = 15.01 mm.................................................................... 79 40. Transmission line networks of the rectenna arrays: (a) 1x2 array and (b) 2x2 array, with l 7 = 8.54 mm, and l 8 = 23.55 mm....................................................... 80 41. 35 GHz rectenna measurement setup diagram...

Ren, Yu-Jiun

2009-05-15T23:59:59.000Z

58

Outage Capacity and Code Design for Dying Channels  

E-Print Network [OSTI]

. The outage exponents are also studied to reveal how fast the outage probability improves over the number of sub-channels. Besides the information-theoretical results, we also study a practical coding scheme for the dying binary erasure channel (DBEC), which...

Zeng, Meng

2012-10-19T23:59:59.000Z

59

Technology Integration Initiative In Support of Outage Management  

SciTech Connect (OSTI)

Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Often, command and control during outages is maintained in the outage control center where many of the underlying technologies supporting outage control are the same as those used in the 1980s. This research reports on the use of advanced integrating software technologies and hand held mobile devices as a means by which to reduce cycle time, improve accuracy, and enhance transparency among outage team members. This paper reports on the first phase of research supported by the DOE Light Water Reactor Sustainability (LWRS) Program that is performed in close collaboration with industry to examine the introduction of newly available technology allowing for safe and efficient outage performance. It is thought that this research will result in: improved resource management among various plant stakeholder groups, reduced paper work, and enhanced overall situation awareness for the outage control center management team. A description of field data collection methods, including personnel interview data, success factors, end-user evaluation and integration of hand held devices in achieving an integrated design are also evaluated. Finally, the necessity of obtaining operations cooperation support in field studies and technology evaluation is acknowledged.

Gregory Weatherby; David Gertman

2012-07-01T23:59:59.000Z

60

Economic Benefits of Increasing Electric Grid Resilience to Weather Outages  

Broader source: Energy.gov (indexed) [DOE]

Economic Benefits of Increasing Electric Grid Resilience to Weather Economic Benefits of Increasing Electric Grid Resilience to Weather Outages Economic Benefits of Increasing Electric Grid Resilience to Weather Outages In June 2011, President Obama released A Policy Framework for the 21st Century Grid which set out a four-pillared strategy for modernizing the electric grid. The initiative directed billions of dollars toward investments in 21st century smart grid technologies focused at increasing the grid's efficiency, reliability, and resilience, and making it less vulnerable to weather-related outages and reducing the time it takes to restore power after an outage occurs. Grid resilience is increasingly important as climate change increases the frequency and intensity of severe weather. Greenhouse gas emissions are elevating air and water temperatures around the world. Scientific research

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Development of Methodologies for Technology Deployment for Advanced Outage Control Centers that Improve Outage Coordination, Problem Resolution and Outage Risk Management  

SciTech Connect (OSTI)

This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The long term viability of existing nuclear power plants in the U.S. will depend upon maintaining high capacity factors, avoiding nuclear safety issues and reducing operating costs. The slow progress in the construction on new nuclear power plants has placed in increased importance on maintaining the output of the current fleet of nuclear power plants. Recently expanded natural gas production has placed increased economic pressure on nuclear power plants due to lower cost competition. Until recently, power uprate projects had steadily increased the total output of the U.S. nuclear fleet. Errors made during power plant upgrade projects have now removed three nuclear power plants from the U.S. fleet and economic considerations have caused the permanent shutdown of a fourth plant. Additionally, several utilities have cancelled power uprate projects citing economic concerns. For the past several years net electrical generation from U.S. nuclear power plants has been declining. One of few remaining areas where significant improvements in plant capacity factors can be made is in minimizing the duration of refueling outages. Managing nuclear power plant outages is a complex and difficult task. Due to the large number of complex tasks and the uncertainty that accompanies them, outage durations routinely exceed the planned duration. The ability to complete an outage on or near schedule depends upon the performance of the outage management organization. During an outage, the outage control center (OCC) is the temporary command center for outage managers and provides several critical functions for the successful execution of the outage schedule. Essentially, the OCC functions to facilitate information inflow, assist outage management in processing information and to facilitate the dissemination of information to stakeholders. Currently, outage management activities primarily rely on telephone communication, face to face reports of status and periodic briefings in the OCC. Much of the information displayed in OCCs is static and out of date requiring an evaluation to determine if it is still valid. Several advanced communication and collaboration technologies have shown promise for facilitating the information flow into, across and out of the OCC. Additionally, advances in the areas of mobile worker technologies, computer based procedures and electronic work packages can be leveraged to improve the availability of real time status to outage managers.

Shawn St. Germain; Ronald Farris; Heather Medeman

2013-09-01T23:59:59.000Z

62

SAMPLE RESULTS FROM MCU SOLIDS OUTAGE  

SciTech Connect (OSTI)

Savannah River National Laboratory (SRNL) has received several solid and liquid samples from MCU in an effort to understand and recover from the system outage starting on April 6, 2014. SRNL concludes that the presence of solids in the Salt Solution Feed Tank (SSFT) is the likely root cause for the outage, based upon the following discoveries ? A solids sample from the extraction contactor #1 proved to be mostly sodium oxalate ? A solids sample from the scrub contactor#1 proved to be mostly sodium oxalate ? A solids sample from the Salt Solution Feed Tank (SSFT) proved to be mostly sodium oxalate ? An archived sample from Tank 49H taken last year was shown to contain a fine precipitate of sodium oxalate ? A solids sample from the extraction contactor #1 drain pipe from extraction contactor#1 proved to be mostly sodium aluminosilicate ? A liquid sample from the SSFT was shown to have elevated levels of oxalate anion compared to the expected concentration in the feed Visual inspection of the SSFT indicated the presence of precipitated or transferred solids, which were likely also in the Salt Solution Receipt Tank (SSRT). The presence of the solids coupled with agitation performed to maintain feed temperature resulted in oxalate solids migration through the MCU system and caused hydraulic issues that resulted in unplanned phase carryover from the extraction into the scrub, and ultimately the strip contactors. Not only did this carryover result in the Strip Effluent (SE) being pushed out of waste acceptance specification, but it resulted in the deposition of solids into several of the contactors. At the same time, extensive deposits of aluminosilicates were found in the drain tube in the extraction contactor #1. However it is not known at this time how the aluminosilicate solids are related to the oxalate solids. The solids were successfully cleaned out of the MCU system. However, future consideration must be given to the exclusion of oxalate solids into the MCU system. There were 53 recommendations for improving operations recently identified. Some additional considerations or additional details are provided below as recommendations. ? From this point on, IC-Anions analyses of the DSSHT should be part of the monthly routine analysis in order to spot negative trends in the oxalate leaving the MCU system. Care must be taken to monitor the oxalate content to watch for sudden precipitation of oxalate salts in the system. ? Conduct a study to optimize the cleaning strategy at ARP-MCU through decreasing the concentration or entirely eliminating the oxalic acid. ? The contents of the SSFT should remain unagitated. Routine visual observation should be maintained to ensure there is not a large buildup of solids. As water with agitation provided sufficient removal of the solids in the feed tank, it should be considered as a good means for dissolving oxalate solids if they are found in the future. ? Conduct a study to improve prediction of oxalate solubility in salt batch feed materials. As titanium and mercury have been found in various solids in this report, evaluate if either element plays a role in oxalate solubility during processing. ? Salt batch characterization focuses primarily on characterization and testing of unaltered Tank 21H material; however, non-typical feeds are developed through cleaning, washing, and/or sump transfers. As these solutions are processed through MCU, they may precipitate solids or reduce performance. Salt batch characterization and testing should be expanded to encompass a broader range of feeds that may be processed through ARPMCU.

Peters, T.; Washington, A.; Oji, L.; Coleman, C.; Poirier, M.

2014-09-22T23:59:59.000Z

63

Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line, June 15, 1999  

Broader source: Energy.gov (indexed) [DOE]

41 41 Federal Register / Vol. 64, No. 114 / Tuesday, June 15, 1999 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/ Olinda-Elverta 230-Kilovolt Double- Circuit Transmission Line AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. In response to this request, Western completed an Interconnection Feasibility Study that determined that

64

A Review of Power Outages and Restoration Following the June 2012 Derecho  

Broader source: Energy.gov [DOE]

This report reviews power outages and restoration efforts following the June 29, 2012 Derecho and compares them to outages and restoration efforts following other spring and summer storms in the...

65

The Approximation of Outage Probability and the Trade-off between Capacity and Diversity for the  

E-Print Network [OSTI]

line channel model in [5]) at high SNR, and give approximations of the outage probability at lowThe Approximation of Outage Probability and the Trade-off between Capacity and Diversity of the equivalent FIR channel filter. The error probability is bounded by the outage probability and the error

Scharf, Louis

66

Operating a Major Electric Utility Today  

Science Journals Connector (OSTI)

...times of major load outages, and pro-vide support in times of transmission outages. In economic terms...ex-tra-high-voltage transmission (Fig. 3), was...of vital utility data both within and...transmission lines, circuit interrupters...

Theodore J. Nagel

1978-09-15T23:59:59.000Z

67

Onsite Wastewater Treatment Systems: Responding to Power Outages and Floods  

E-Print Network [OSTI]

People and the environment can be harmed if a home's onsite wastewater treatment system does not work properly after a flood or power outage. This publication explains the steps to take after such an event to get the system back into service. 4 pp...

Lesikar, Bruce J.; Mechell, Justin; Alexander, Rachel

2008-10-23T23:59:59.000Z

68

HPSS Outage Tue Mar 19 - Fri Mar 22  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HPSS HPSS Outage Tue Mar 19 - Fri Mar 22 HPSS Outage Tue Mar 19 - Fri Mar 22 March 12, 2013 by Francesca Verdier (0 Comments) The NERSC HPSS "User" system (archive.nersc.gov) will be down for four days from Tue Mar 19 07:00 to Fri Mar 22 17:00). The system will be upgraded from HPSS version 6.2 to version 7.3. This new version of the HPSS server software is not compatible with current GridFTP servers. This means the NERSC HPSS systems will not support any grid-based transfer methods (including GlobusOnline) following the upgrade. We expect to install a fix for this problem during a scheduled downtime by the end of April. This is a major upgrade that will require users of the HPSS User system to switch to new versions of the HPSS client software tools hsi and htar.

69

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect (OSTI)

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

70

Annual Steam System Maintenance Outage (2014) Beginning on Sunday, June 8th  

E-Print Network [OSTI]

Annual Steam System Maintenance Outage (2014) Beginning on Sunday, June 8th at 12:00pm (Noon), the Central Utility Plant (CUP), which supplies steam service to over 100 buildings on the Newark campus, will be shut down for the annual Steam System Maintenance Outage. This effort is necessary each year to ensure

Firestone, Jeremy

71

Outage Detection in Power Distribution Networks with Optimally-Deployed Power Flow Sensors  

E-Print Network [OSTI]

Outage Detection in Power Distribution Networks with Optimally-Deployed Power Flow Sensors Yue Zhao deployed real-time power flow sensors and that of load estimates via Advanced Metering Infrastructure (AMI within each subtree only the sensors at its root and on its boundary are used. Outage detection

Zhao, Yue

72

Outage Detection via Real-time Social Stream Analysis: Leveraging the Power of Online Complaints  

E-Print Network [OSTI]

disruptions. Each is described below with their ac- companying defects. Internal monitoring systems. NetflixOutage Detection via Real-time Social Stream Analysis: Leveraging the Power of Online Complaints documents the design and development of an outage detection system for the online services provided

Dekhtyar, Alexander

73

Photoconductive circuit element reflectometer  

DOE Patents [OSTI]

A photoconductive reflectometer for characterizing semiconductor devices at millimeter wavelength frequencies where a first photoconductive circuit element (PCE) is biased by a direct current voltage source and produces short electrical pulses when excited into conductance by short first laser light pulses. The electrical pulses are electronically conditioned to improve the frequency related amplitude characteristics of the pulses which thereafter propagate along a transmission line to a device under test. Second PCEs are connected along the transmission line to sample the signals on the transmission line when excited into conductance by short second laser light pulses, spaced apart in time a determinable period from the first laser light pulses. Electronic filters connected to each of the second PCEs act as low-pass filters and remove parasitic interference from the sampled signals and output the sampled signals in the form of slowed-motion images of the signals on the transmission line. 4 figs.

Rauscher, C.

1987-12-07T23:59:59.000Z

74

Photoconductive circuit element reflectometer  

DOE Patents [OSTI]

A photoconductive reflectometer for characterizing semiconductor devices at millimeter wavelength frequencies where a first photoconductive circuit element (PCE) is biased by a direct current voltage source and produces short electrical pulses when excited into conductance by short first laser light pulses. The electrical pulses are electronically conditioned to improve the frequency related amplitude characteristics of the pulses which thereafter propagate along a transmission line to a device under test. Second PCEs are connected along the transmission line to sample the signals on the transmission line when excited into conductance by short second laser light pulses, spaced apart in time a variable period from the first laser light pulses. Electronic filters connected to each of the second PCEs act as low-pass filters and remove parasitic interference from the sampled signals and output the sampled signals in the form of slowed-motion images of the signals on the transmission line.

Rauscher, Christen (Alexandria, VA)

1990-01-01T23:59:59.000Z

75

Market Assessment of Planned Refinery Outages March … June 2009  

Gasoline and Diesel Fuel Update (EIA)

09)/1 09)/1 Market Assessment of Planned Refinery Outages March - June 2009 March 2009 Energy Information Administration Office of Oil and Gas U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be attributed to the Energy Information Administration and should not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization. Service Reports are prepared by the Energy Information Administration upon special request and are based on assumptions specified by the requestor.

76

Printed Circuits  

Science Journals Connector (OSTI)

... a leading contributor to the technology of printed circuits, and the inventor of the printed foil technique now in general use.

J. C. CLULEY

1959-05-30T23:59:59.000Z

77

Homeowners: Respond to Power Outages | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

work to restore power to critical infrastructure like power plants and transmission lines, water treatment facilities, and telecommunications networks, and also to hospitals,...

78

U.S. - Canada Power System Outage Task Force: Final Report on the  

Broader source: Energy.gov (indexed) [DOE]

- Canada Power System Outage Task Force: Final Report on the - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations On August 14, 2003, the largest power blackout in North American history affected an area with an estimated 50 million people and 61,800 megawatts (MW) of electric load in the states of Ohio, Michigan, Pennsylvania, New York, Vermont, Massachusetts, Connecticut and New Jersey, and the Canadian province of Ontario. U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations More Documents & Publications Blackout 2003: Blackout Final Implementation Report Blackout 2003: The August 14, 2003 Blackout One Year Later: Actions Taken

79

A mathematical analysis of optimized waveform relaxation for a small RC circuit  

Science Journals Connector (OSTI)

Waveform relaxation techniques are an important tool for the simulation of very large scale circuits. They are based on a partition of the circuit into sub-circuits, and then use an iteration between sub-circuits to converge to the solution of the entire ... Keywords: Circuit simulation, Optimized transmission conditions, Waveform relaxation

Mohammad Al-Khaleel; Martin J. Gander; Albert E. Ruehli

2014-01-01T23:59:59.000Z

80

A Review of Power Outages and Restoration Following the June 2012 Derecho |  

Broader source: Energy.gov (indexed) [DOE]

A Review of Power Outages and Restoration Following the June 2012 A Review of Power Outages and Restoration Following the June 2012 Derecho A Review of Power Outages and Restoration Following the June 2012 Derecho August 7, 2012 - 11:16am Addthis The Office of Electricity Delivery and Energy Reliability has released a report that reviews power outages and restoration efforts following the June 29, 2012 Derecho and compares them to outages and restoration efforts following other spring and summer storms in the Ohio Valley and Mid-Atlantic regions. View the Report. Addthis Related Articles Salazar, Chu Announce Major Offshore Wind Initiatives A Review of Power Outages and Restoration Following the June 2012 Derecho Response to Hurricane Irene - Restoring Power on the East Coast President Barack Obama listens to Acting Energy Secretary Daniel B. Poneman during a meeting with electric utility CEOs and trade association representatives at the Department of Energy in Washington, D.C., May 8, 2013. | Official White House Photo by Pete Souza.

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Reliability models of wind farms considering wind speed correlation and WTG outage  

Science Journals Connector (OSTI)

Abstract Wind speed correlation and wind turbine generator (WTG) outage are two factors affecting the reliability model of wind farms, but they are not addressed simultaneously in the existing literature. Meanwhile, WTG outage is reported to be dependent with wind speed to some extent. Therefore, the extended reliability models of wind farms incorporating both of these two factors and the dependency between WTG outage and wind speed are proposed in this paper. To consider the uncertainties and dependencies of wind speed and WTG failure, Copula method is applied to simulate correlated random variables representing for wind speed and the number of failed WTG units. Moreover, the linear apportioning technique is used to create multistate reliability models of wind farms from hourly wind power models. A number of sensitivity analyses on the modified IEEE RTS with wind power are conducted to validate the proposed reliability models for generation adequacy assessment. Case studies show that the generation adequacy indices increase with the correlation of wind speed and WTG forced outage rate (FOR). It is meaningful to point out that the effect of dependency between wind speed and WTG FOR on generation adequacy is minimal when WTG outages are independent, but it will be substantially larger when WTG outages are highly dependent. The proposed multistate reliability models of wind farms provide foundation for the reliability assessment of power systems with wind power integrated.

Fan Chen; Fangxing Li; Zhinong Wei; Guoqiang Sun; Jun Li

2015-01-01T23:59:59.000Z

82

DOE Transmission Capacity Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

83

Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project  

SciTech Connect (OSTI)

The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are optimally deployed with the least amount of delay and unproductive use of resources. The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how a Micro-Scheduling capability helps address those challenges, and provides a status update on work accomplished to date and the path forward.

Shawn St. Germain; Kenneth Thomas; Ronald Farris; Jeffrey Joe

2014-09-01T23:59:59.000Z

84

Polarization independent microphotonic circuits  

E-Print Network [OSTI]

Microphotonic circuits have been proposed for applications ranging from optical switching and routing to optical logic circuits. However many applications require microphotonic circuits to be polarization independent, a ...

Watts, Michael Robert, 1974-

2005-01-01T23:59:59.000Z

85

ORNL Network Outage, Friday, April 15, 9:30 p.m. to Date  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Outage Outage All externally accessible ORNL servers, including the ORNL DAAC Web Site, http://daac.ornl.gov are experiencing network outages or slow connectivity at this time. The ORNL Information Technology's Cyber Security Program is working hard to restore full external functionality. We apologize for this inconvenience and appreciate your patience during our down time. At this time you can explore our Web site and access data products including MODIS Land Products Subsets, albeit slowly. The following tools: Mercury (Simple Search and Advanced Product Search) WebGIS Spatial Data Access Tool (SDAT) Thematic Real-time Environmental Distributed Data Services (THREDDS) Data Server (TDS) as well as the following Web Sites: Mast-DC FLUXNET are not available. You may experience problems signing-in or

86

Power Outages Update: Post-Tropical Cyclone Sandy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Outages Update: Post-Tropical Cyclone Sandy Outages Update: Post-Tropical Cyclone Sandy Power Outages Update: Post-Tropical Cyclone Sandy October 29, 2012 - 9:37pm Addthis Sandy made landfall as a post-tropical cyclone on the southern coast of New Jersey near Atlantic City at 8 p.m. with top sustained winds of 80 mph. | Photo courtesy of NOAA Sandy made landfall as a post-tropical cyclone on the southern coast of New Jersey near Atlantic City at 8 p.m. with top sustained winds of 80 mph. | Photo courtesy of NOAA Dan Leistikow Dan Leistikow Former Director, Office of Public Affairs As of 8:00 pm EDT on October 29, there were more than 3.6 million customers without power in the affected states. The Energy Department is continuing to monitor the progress of the storm throughout the night and will publish

87

Market Assessment of Refinery Outages Planned for March 2011 through June 2011  

Gasoline and Diesel Fuel Update (EIA)

Assessment of Refinery Assessment of Refinery Outages Planned for March 2011 through June 2011 APRIL 2011 www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration / Market Assessment of Planned Refinery Outages / March 2011 - June 2011 ii This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies. U.S. Energy Information Administration / Market Assessment of Planned Refinery Outages /

88

Complex dynamics of blackouts in power transmission systems  

Science Journals Connector (OSTI)

In order to study the complex global dynamics of a series of blackouts in power transmission systems a dynamical model of such a system has been developed. This model includes a simple representation of the dynamical evolution by incorporating the growth of power demand the engineering response to system failures and the upgrade of generator capacity. Two types of blackouts have been identified each having different dynamical properties. One type of blackout involves the loss of load due to transmission lines reaching their load limits but no line outages. The second type of blackout is associated with multiple line outages. The dominance of one type of blackout over the other depends on operational conditions and the proximity of the system to one of its two critical points. The model displays characteristics such as a probability distribution of blackout sizes with power tails similar to that observed in real blackout data from North America.

B. A. Carreras; V. E. Lynch; I. Dobson; D. E. Newman

2004-01-01T23:59:59.000Z

89

Synthesis of Lumped Transmission-Line Analogs  

E-Print Network [OSTI]

Transmission lines and their lumped approximating networks have long been incorporated into radio-frequency power amplifiers to improve efficiency and shape circuit waveforms and are beginning to perform a similar roles ...

Phinney, Joshua W.

90

Draft!07"18"2011! 1 Turning the Tide on Outages1  

E-Print Network [OSTI]

! Draft!07"18"2011! 1 Turning the Tide on Outages1 What are the true costs of implementing!data!for!the!U.S.,!which!are!generally!available!from! several!sources,!including!from!the!U.S.!DOE's!Energy!University!of!Minnesota,!he!directed!all!Infrastructure!Security,!Grid! Operations/Planning,!and!Energy!Ma

Amin, S. Massoud

91

Steam turbine maintenance and repair technology: Reducing planned-outage costs  

SciTech Connect (OSTI)

The North American Electric Reliability Council (NAERC) reported that the average loss of equivalent availability per outage for a major fossil turbine overhaul is 323,000 MW-HR. The Electric Power Research Institute (EPRI) Generation and Storage Division, is in the first phase of a major research project to reduce the duration and/or frequency of steam turbine maintenance outages. This project consists of an assessment of the current state-of-the-art turbine maintenance and repair techniques and technologies. It is based on a review of current turbine maintenance practices of the US, European, Japanese, and Australian utility industries. Emphasized are maintenance and repair activities that have the most significant impact on outage duration or frequency. Twenty-six key turbine maintenance activities and the current best techniques were identified for use by utility maintenance personnel. Overall outage durations could be reduced if the duration of these activities were shortened or if they were performed more effectively. Recommended projects for development of advanced steam turbine maintenance technology were identified. 29 refs., 46 figs., 9 tabs.

Grace, H.P.; McClintock, M. (General Physics Corp., Columbia, MD (USA)); Lamping, G. (Southwest Research Inst., San Antonio, TX (USA))

1990-04-01T23:59:59.000Z

92

Photoconductive circuit element pulse generator  

DOE Patents [OSTI]

A pulse generator for characterizing semiconductor devices at millimeter wavelength frequencies where a photoconductive circuit element (PCE) is biased by a direct current voltage source and produces short electrical pulses when excited into conductance by short laser light pulses. The electrical pulses are electronically conditioned to improve the frequency related amplitude characteristics of the pulses which thereafter propagate along a transmission line to a device under test.

Rauscher, Christen (Alexandria, VA)

1989-01-01T23:59:59.000Z

93

A reliability cost-benefit analysis for HVDC transmission expansion planning  

SciTech Connect (OSTI)

A major portion of Manitoba Hydro's generation is located in the North on the Nelson River. The lower Nelson River generation is brought into the load centre in Southern Manitoba through an HVDC transmission system consisting of two bipoles, the first rated at 1680 MW at the rectifier and the second at 2000 MW. This paper presents the methodology used in arriving at the optimum Bipole 3 size using a reliability cost-benefit analysis. The analysis considers the forced outages of the generation and transmission systems using system outage statistics. The generator and valve group maintenance and the reduction in capability of thyristor valve groups during the summer season were also incorporated in the analysis. The load model used in the study was based on system data for the period 1980-1984. The criterion used in choosing the Bipole 3 size is to optimize the present worth value of the annual energy curtailment due to the HVDC system forced outages and the incremental installation cost of the transmission as the capacity of Bipole 3 is increased. The optimum Bipole 3 size based on the study is 2200 MW. This value is significantly lower than that based on a pole spare criterion used in the earlier development of the HVDC system. Finally, the need for validation of the outage data in evaluating future HVDC projects and the need for data collection and classification is indicated.

Kuruganty, P.R.S. (Manitoba Hydro, Winnipeg, Manitoba (CA)); Woodford, D.A. (Manitoba HVDC Research Centre, Winnipeg, Manitoba (CA))

1988-07-01T23:59:59.000Z

94

Commutation circuit for an HVDC circuit breaker  

DOE Patents [OSTI]

A commutation circuit for a high voltage DC circuit breaker incorporates a resistor capacitor combination and a charging circuit connected to the main breaker, such that a commutating capacitor is discharged in opposition to the load current to force the current in an arc after breaker opening to zero to facilitate arc interruption. In a particular embodiment, a normally open commutating circuit is connected across the contacts of a main DC circuit breaker to absorb the inductive system energy trapped by breaker opening and to limit recovery voltages to a level tolerable by the commutating circuit components. 13 figs.

Premerlani, W.J.

1981-11-10T23:59:59.000Z

95

Commutation circuit for an HVDC circuit breaker  

DOE Patents [OSTI]

A commutation circuit for a high voltage DC circuit breaker incorporates a resistor capacitor combination and a charging circuit connected to the main breaker, such that a commutating capacitor is discharged in opposition to the load current to force the current in an arc after breaker opening to zero to facilitate arc interruption. In a particular embodiment, a normally open commutating circuit is connected across the contacts of a main DC circuit breaker to absorb the inductive system energy trapped by breaker opening and to limit recovery voltages to a level tolerable by the commutating circuit components.

Premerlani, William J. (Scotia, NY)

1981-01-01T23:59:59.000Z

96

2010 Transmission Reliability Program Peer Review | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Reliability Program Peer Review Transmission Reliability Program Peer Review 2010 Transmission Reliability Program Peer Review The Transmission Reliability research area focuses on two key areas: 1) Real-Time Grid Reliability Management and 2) Reliability and Markets. The first area develops monitoring and analysis tools that process synchrophasor data to enable real-time assessment of grid status and stability margins, with the goal of improving power system reliability and visibility through wide-area measurement and control. It is developing advanced technologies and tools to help create a resilient electric transmission system that can better detect disturbances, accommodate a variety of generation sources, and automatically reconfigure the grid to prevent widespread outages and/or rebalance the system. The second area

97

digital circuit patch bay  

Science Journals Connector (OSTI)

A patch bay in which low-level digital data circuits may be patched, monitored, and tested. Note: The digital circuit patch bay may be either (a) a...See also circuit ...

2001-01-01T23:59:59.000Z

98

STEPS TO ESTABLISH A REAL-TIME TRANSMISSION MONITORING SYSTEM FOR TRANSMISSION OWNERS AND OPERATORS WITHIN THE  

Broader source: Energy.gov (indexed) [DOE]

STEPS TO ESTABLISH A REAL-TIME TRANSMISSION MONITORING STEPS TO ESTABLISH A REAL-TIME TRANSMISSION MONITORING SYSTEM FOR TRANSMISSION OWNERS AND OPERATORS WITHIN THE EASTERN AND WESTERN INTERCONNECTIONS A REPORT TO CONGRESS PURSUANT TO SECTION 1839 OF THE ENERGY POLICY ACT OF 2005 Prepared by United States Department of Energy & Federal Energy Regulatory Commission February 3, 2006 Report to Congress Joint Report by the Department of Energy and Federal Energy Regulatory Commission on Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western Interconnections February 2006 Executive Summary In August 2003, an electrical outage in one state precipitated a cascading blackout across seven other states and as far north as a province in Canada, leaving more than 50 million

99

Confidence intervals for state probabilities of system capacity outages and for LOLP  

E-Print Network [OSTI]

CONFID"NC. , INTERVALS FO- S'TATE PROBABILITIES OF SYSTEM CAPACITY OUTAGES AND FOR LOLP A Thcsi. , bv ATHANASIOS STASINOS Submi. tted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree... of MASTER OF SCIENCE December 1974 Major Subject: Electrical Engineering CONFIDENCE INTERVALS FOR STA1'E PROBABILITIES OF STSTEM CAPACITY OVTAGES AND FOR LOLP A Thesis by ATHANASIOS STASINOS Approved as to style and content by: (Chairman...

Stasinos, Athanasios

1974-01-01T23:59:59.000Z

100

Optimized Waveform Relaxation Methods for the Longitudinal Partitioning of Transmission Lines  

E-Print Network [OSTI]

1 Optimized Waveform Relaxation Methods for the Longitudinal Partitioning of Transmission Lines convergence. Here we consider transmission line circuits since they represent an important part of a Spice type circuit solver. For transmission lines, the coupling between different lines is relatively weak

Gander, Martin J.

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Universal Quantum Circuits  

E-Print Network [OSTI]

We define and construct efficient depth-universal and almost-size-universal quantum circuits. Such circuits can be viewed as general-purpose simulators for central classes of quantum circuits and can be used to capture the computational power of the circuit class being simulated. For depth we construct universal circuits whose depth is the same order as the circuits being simulated. For size, there is a log factor blow-up in the universal circuits constructed here. We prove that this construction is nearly optimal.

Debajyoti Bera; Stephen Fenner; Frederic Green; Steve Homer

2008-04-15T23:59:59.000Z

102

Estes-Flatiron Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

103

Using Transmission Lines for Global On-Chip Communication  

E-Print Network [OSTI]

1 Using Transmission Lines for Global On-Chip Communication Aaron Carpenter, Jianyun Hu, Jie Xu-switched network-on-chip a less attractive option. An alternative solution uses well-engineered transmission lines as communication links. These transmission lines, along with simple, practical circuits using modern CMOS technol

Huang, Michael C.

104

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

105

MATCASC: A tool to analyse cascading line outages in power grids  

E-Print Network [OSTI]

Blackouts in power grids typically result from cascading failures. The key importance of the electric power grid to society encourages further research into sustaining power system reliability and developing new methods to manage the risks of cascading blackouts. Adequate software tools are required to better analyze, understand, and assess the consequences of the cascading failures. This paper presents MATCASC, an open source MATLAB based tool to analyse cascading failures in power grids. Cascading effects due to line overload outages are considered. The applicability of the MATCASC tool is demonstrated by assessing the robustness of IEEE test systems and real-world power grids with respect to cascading failures.

Ko, Yakup; Araujo, Nuno A M; Warnier, Martijn

2013-01-01T23:59:59.000Z

106

Outage Log  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1814 4:45 PST 111814 10:18 PST Project Unavailable. 111214 0:22 PST - Hopper IDLMATLABMathematica unavailable on Hopper. 111214 0:22 PST - Edison IDLMATLABMathematica...

107

Piezoelectric drive circuit  

DOE Patents [OSTI]

A piezoelectric motor drive circuit is provided which utilizes the piezoelectric elements as oscillators and a Meacham half-bridge approach to develop feedback from the motor ground circuit to produce a signal to drive amplifiers to power the motor. The circuit automatically compensates for shifts in harmonic frequency of the piezoelectric elements due to pressure and temperature changes. 7 figs.

Treu, C.A. Jr.

1999-08-31T23:59:59.000Z

108

Piezoelectric drive circuit  

DOE Patents [OSTI]

A piezoelectric motor drive circuit is provided which utilizes the piezoelectric elements as oscillators and a Meacham half-bridge approach to develop feedback from the motor ground circuit to produce a signal to drive amplifiers to power the motor. The circuit automatically compensates for shifts in harmonic frequency of the piezoelectric elements due to pressure and temperature changes.

Treu, Jr., Charles A. (Raymore, MO)

1999-08-31T23:59:59.000Z

109

Kangley - Echo Lake Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

STATEMENT STATEMENT Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Kangley-Echo Lake Transmission Line Project State Involved: Washington Abstract: BPA is proposing to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmis- sion line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as

110

Transmission Lines Emulating Moving Media  

E-Print Network [OSTI]

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

111

Theory of degenerate three-wave mixing using circuit QED in solid-state circuits  

SciTech Connect (OSTI)

We study the theory of degenerate three-wave mixing and the generation of squeezed microwaves using circuit quantum electrodynamics in solid state circuits. The Hamiltonian for degenerate three-wave mixing, which seemed to be given phenomenologically in quantum optics, is derived by quantum mechanical calculations. The nonlinear medium needed in three-wave mixing is composed of a series of superconducting charge qubits which are located inside two superconducting transmission-line resonators. Here, the multiqubit ensemble is present to enhance the effective coupling constant between the two modes in the transmission-line resonators. In the squeezing process, the qubits are kept in their ground states so that their decoherence does not corrupt the squeezing. The main obstacle preventing a large squeezing efficiency is the decay rate of the transmission-line resonator.

Cao, Ye [Key Laboratory of Atomic and Molecular Nanosciences and Department of Physics, Tsinghua University, Beijing 100084 (China); Huo, Wen Yi [Institute of Applied Physics and Computational Mathematics, Beijing 100088 (China); Ai, Qing [Institute of Theoretical Physics, Chinese Academy of Sciences, Beijing 100190 (China); Long, Gui Lu [Key Laboratory of Atomic and Molecular Nanosciences and Department of Physics, Tsinghua University, Beijing 100084 (China); Tsinghua National Laboratory For Information Science and Technology, Beijing 100084 (China)

2011-11-15T23:59:59.000Z

112

Resolving piping analysis issues to minimize impact on installation activities during refueling outage at nuclear power plants  

SciTech Connect (OSTI)

While it is required to maintain piping code compliance for all phases of installation activities during outages at a nuclear plant, it is equally essential to reduce challenges to the installation personnel on how plant modification work should be performed. Plant betterment activities that incorporate proposed design changes are continually implemented during the outages. Supporting analysis are performed to back these activities for operable systems. The goal is to reduce engineering and craft man-hours and minimize outage time. This paper outlines how plant modification process can be streamlined to facilitate construction teams to do their tasks that involve safety related piping. In this manner, installation can proceed by minimizing on the spot analytical effort and reduce downtime to support the proposed modifications. Examples are provided that permit performance of installation work in any sequence. Piping and hangers including the branch lines are prequalified and determined operable. The system is up front analyzed for all possible scenarios. The modification instructions in the work packages is flexible enough to permit any possible installation sequence. The benefit to this approach is large enough in the sense that valuable outage time is not extended and on site analytical work is not required.

Bhavnani, D. [Public Service Electric and Gas Co., Hancocks Bridge, NJ (United States)

1996-12-01T23:59:59.000Z

113

Radiation-hardened transistor and integrated circuit  

DOE Patents [OSTI]

A composite transistor is disclosed for use in radiation hardening a CMOS IC formed on an SOI or bulk semiconductor substrate. The composite transistor has a circuit transistor and a blocking transistor connected in series with a common gate connection. A body terminal of the blocking transistor is connected only to a source terminal thereof, and to no other connection point. The blocking transistor acts to prevent a single-event transient (SET) occurring in the circuit transistor from being coupled outside the composite transistor. Similarly, when a SET occurs in the blocking transistor, the circuit transistor prevents the SET from being coupled outside the composite transistor. N-type and P-type composite transistors can be used for each and every transistor in the CMOS IC to radiation harden the IC, and can be used to form inverters and transmission gates which are the building blocks of CMOS ICs.

Ma, Kwok K. (Albuquerque, NM)

2007-11-20T23:59:59.000Z

114

ORNL Network Outage, Friday, April 15, 9:30 p.m. to Date  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Updated 4/25/2011 Updated 4/25/2011 All externally accessible ORNL servers, including the ORNL DAAC Web Site, http://daac.ornl.gov are experiencing network outages or slow connectivity at this time. We apologize for this inconvenience and appreciate your patience during our down time. At this time you can explore our Web site and access data products including MODIS Land Products Subsets, albeit slowly. However, the following Web sites and tools have been taken off the Internet and are not available: Mercury (DAAC Simple Search and Advanced Product Search) WebGIS Spatial Data Access Tool (SDAT) Thematic Real-time Environmental Distributed Data Services (THREDDS) Data Server (TDS) MAST-DC FLUXNET Beija-flor (at ORNL) You may experience problems signing-in or registering with our Web site.

115

Market Assessment of Refinery Outages Planned for October 2010 through January 2011  

Gasoline and Diesel Fuel Update (EIA)

10)/2 10)/2 Market Assessment of Refinery Outages Planned for October 2010 through January 2011 November 2010 Energy Information Administration Office of Petroleum, Gas, and Biofuels Analysis U.S. Department of Energy Washington, DC 20585 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies. E nergy Information Adminis tration Market As s es s ment of P lanned R

116

A Review of Power Outages and Restoration Following the June 2012 Derecho  

Broader source: Energy.gov (indexed) [DOE]

August 2012 August 2012 A Review of Power Outages and Restoration Following the June 2012 Derecho Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy Reliability U.S. Department of Energy For Further Information This report was prepared by the Office of Electricity Delivery and Energy Reliability under the direction of Patricia Hoffman, Assistant Secretary, and William Bryan, Deputy Assistant Secretary. Specific questions about this report may be directed to Alice Lippert, Senior Technical Advisor (alice.lippert@hq.doe.gov). (Cover image from the National Weather Service) OE/ISER 8/6/2012 1 Background On June 29, 2012, a major storm system known as a derecho ("deh-REY-cho") formed and

117

Market Assessment of Refinery Outages Planned for October 2009 through January 2010  

Gasoline and Diesel Fuel Update (EIA)

09)/2 09)/2 Market Assessment of Refinery Outages Planned for October 2009 through January 2010 November 2009 Energy Information Administration Office of Oil and Gas U.S. Department of Energy Washington, DC 20585 This report was prepared by the U.S. Energy Information Administration (EIA), the independent statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views herein should not be construed as representing those of the Department or the Administration. Preface and Contacts The Energy Information Administration (EIA) is the independent statistical and analytical

118

SAS Output  

U.S. Energy Information Administration (EIA) Indexed Site

A. U.S. Transmission Circuit Outages by Type and NERC region, 2012 A. U.S. Transmission Circuit Outages by Type and NERC region, 2012 Outage Type FRCC MRO NPCC RFC SERC SPP TRE WECC Contiguous U.S. Circuit Outage Counts Automatic Outages (Sustained) 151.00 163.00 127.00 272.00 374.00 105.00 80.00 796.00 2,068.00 Non-Automatic Outages (Operational) 77.00 44.00 97.00 230.00 192.00 27.00 45.00 337.00 1,049.00 Non-Automatic Outages (Planned) 2,650.00 453.00 512.00 2,050.00 2,450.00 369.00 472.00 2,744.00 11,700.00 Circuit Outage Hours Automatic Outages (Sustained) 2,852.28 1,312.97 14,244.87 19,857.23 7,123.70 1,509.51 682.60 24,238.64 71,821.80 Non-Automatic Outages (Operational) 186.87 27.08 67.68 186.08 426.59 3.32 13.96 67.59 979.17 Non-Automatic Outages (Planned) 872.65 710.33 1,222.36 1,095.46 503.01 357.44 105.06 1,105.43 5,971.74

119

Development and interrupting tests on 250KV 8KA HVDC circuit breaker  

SciTech Connect (OSTI)

This paper describes the circuit and component selections, development and equivalent circuit test results on an HVDC circuit breaker for an HVDC transmission line. A puffer type SF/sub 6/ gas interrupter for AC circuit breakers is utilized for interrupting DC current with injection of high-frequency inverse current from a commutating capacitor precharged to HVDC line voltage. Also, the effectiveness of application of the HVDC breaker to an HVDC system with two parallel transmission lines is demonstrated through the EMTP simulation.

Tokuyama, S.; Arimatsu, K.; Hirata, K.; Kato, Y.; Yoshioka, Y.

1985-09-01T23:59:59.000Z

120

Virtual Circuits (OSCARS)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Virtual Circuits (OSCARS) Virtual Circuits (OSCARS) Services Overview ECS Audio/Video Conferencing Fasterdata IPv6 Network Network Performance Tools (perfSONAR) ESnet OID Registry PGP Key Service Virtual Circuits (OSCARS) OSCARS Case Study Documentation Links Hardware Requirements DOE Grids Service Transition Contact Us Technical Assistance: 1 800-33-ESnet (Inside the US) 1 800-333-7638 (Inside the US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Virtual Circuits (OSCARS) ESnet's On-Demand Secure Circuits and Advance Reservation System (OSCARS) provides multi-domain, high-bandwidth virtual circuits that guarantee end-to-end network data transfer performance. Originally a research concept, OSCARS has grown into a robust production service. Currently

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Regenerative feedback resonant circuit  

DOE Patents [OSTI]

A regenerative feedback resonant circuit for measuring a transient response in a loop is disclosed. The circuit includes an amplifier for generating a signal in the loop. The circuit further includes a resonator having a resonant cavity and a material located within the cavity. The signal sent into the resonator produces a resonant frequency. A variation of the resonant frequency due to perturbations in electromagnetic properties of the material is measured.

Jones, A. Mark; Kelly, James F.; McCloy, John S.; McMakin, Douglas L.

2014-09-02T23:59:59.000Z

122

Data transmission system with distributed microprocessors  

DOE Patents [OSTI]

A data transmission system having a common request line and a special request line in addition to a transmission line. The special request line has priority over the common request line. A plurality of node stations are multi-drop connected to the transmission line. Among the node stations, a supervising station is connected to the special request line and takes precedence over other slave stations to become a master station. The master station collects data from the slave stations. The station connected to the common request line can assign a master control function to any station requesting to be assigned the master control function within a short period of time. Each station has an auto response control circuit. The master station automatically collects data by the auto response controlling circuit independently of the microprocessors of the slave stations.

Nambu, Shigeo (Fuchu, JP)

1985-01-01T23:59:59.000Z

123

A transmission calibration method for superconducting resonators  

E-Print Network [OSTI]

A method is proposed and experimentally explored for \\textit{in-situ} calibration of complex transmission data for superconducting microwave resonators. This cryogenic calibration method accounts for the instrumental transmission response between the vector network analyzer reference plane and the device calibration plane. Once calibrated, the observed resonator response was modeled in detail by two approaches. The first, a phenomenological model based on physically realizable rational functions, enables the extraction of multiple resonance frequencies and widths for coupled resonators without explicit specification of the circuit network. In the second, an ABCD-matrix representation for the distributed transmission line circuit is used to model the observed response from the characteristic impedance and propagation constant. When used in conjunction with electromagnetic simulations, the kinetic inductance fraction can be determined with this method with an accuracy of 2%. Datasets for superconducting microst...

Cataldo, Giuseppe; Barrentine, Emily M; Brown, Ari D; Moseley, Samuel H; U-Yen, Kongpop

2014-01-01T23:59:59.000Z

124

Compensated gain control circuit for buck regulator command charge circuit  

DOE Patents [OSTI]

A buck regulator command charge circuit includes a compensated-gain control signal for compensating for changes in the component values in order to achieve optimal voltage regulation. The compensated-gain control circuit includes an automatic-gain control circuit for generating a variable-gain control signal. The automatic-gain control circuit is formed of a precision rectifier circuit, a filter network, an error amplifier, and an integrator circuit.

Barrett, David M. (Albuquerque, NM)

1996-01-01T23:59:59.000Z

125

Compensated gain control circuit for buck regulator command charge circuit  

DOE Patents [OSTI]

A buck regulator command charge circuit includes a compensated-gain control signal for compensating for changes in the component values in order to achieve optimal voltage regulation. The compensated-gain control circuit includes an automatic-gain control circuit for generating a variable-gain control signal. The automatic-gain control circuit is formed of a precision rectifier circuit, a filter network, an error amplifier, and an integrator circuit. 5 figs.

Barrett, D.M.

1996-11-05T23:59:59.000Z

126

Quantum Circuits Architecture  

E-Print Network [OSTI]

We present a method for optimizing quantum circuits architecture. The method is based on the notion of "quantum comb", which describes a circuit board in which one can insert variable subcircuits. The method allows one to efficiently address novel kinds of quantum information processing tasks, such as storing-retrieving, and cloning of channels.

Giulio Chiribella; Giacomo Mauro D'Ariano; Paolo Perinotti

2007-12-09T23:59:59.000Z

127

Transmission Investment: A Primer  

SciTech Connect (OSTI)

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

128

Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at...

129

Online circuit breaker monitoring system  

E-Print Network [OSTI]

inspection and maintenance of the circuit breakers. An automated online circuit breaker monitoring system is proposed to monitor condition, operation and status of high and medium voltage circuit breakers. By tracking equipment condition, this system could...

Djekic, Zarko

2008-10-10T23:59:59.000Z

130

Online circuit breaker monitoring system  

E-Print Network [OSTI]

inspection and maintenance of the circuit breakers. An automated online circuit breaker monitoring system is proposed to monitor condition, operation and status of high and medium voltage circuit breakers. By tracking equipment condition, this system could...

Djekic, Zarko

2009-05-15T23:59:59.000Z

131

Sensor readout detector circuit  

DOE Patents [OSTI]

A sensor readout detector circuit is disclosed that is capable of detecting sensor signals down to a few nanoamperes or less in a high (microampere) background noise level. The circuit operates at a very low standby power level and is triggerable by a sensor event signal that is above a predetermined threshold level. A plurality of sensor readout detector circuits can be formed on a substrate as an integrated circuit (IC). These circuits can operate to process data from an array of sensors in parallel, with only data from active sensors being processed for digitization and analysis. This allows the IC to operate at a low power level with a high data throughput for the active sensors. The circuit may be used with many different types of sensors, including photodetectors, capacitance sensors, chemically-sensitive sensors or combinations thereof to provide a capability for recording transient events or for recording data for a predetermined period of time following an event trigger. The sensor readout detector circuit has applications for portable or satellite-based sensor systems. 6 figs.

Chu, D.D.; Thelen, D.C. Jr.

1998-08-11T23:59:59.000Z

132

Sensor readout detector circuit  

DOE Patents [OSTI]

A sensor readout detector circuit is disclosed that is capable of detecting sensor signals down to a few nanoamperes or less in a high (microampere) background noise level. The circuit operates at a very low standby power level and is triggerable by a sensor event signal that is above a predetermined threshold level. A plurality of sensor readout detector circuits can be formed on a substrate as an integrated circuit (IC). These circuits can operate to process data from an array of sensors in parallel, with only data from active sensors being processed for digitization and analysis. This allows the IC to operate at a low power level with a high data throughput for the active sensors. The circuit may be used with many different types of sensors, including photodetectors, capacitance sensors, chemically-sensitive sensors or combinations thereof to provide a capability for recording transient events or for recording data for a predetermined period of time following an event trigger. The sensor readout detector circuit has applications for portable or satellite-based sensor systems.

Chu, Dahlon D. (Albuquerque, NM); Thelen, Jr., Donald C. (Bozeman, MT)

1998-01-01T23:59:59.000Z

133

Plant Outage Time Savings Provided by Subcritical Physics Testing at Vogtle Unit 2  

SciTech Connect (OSTI)

The most recent core reload design verification physics testing done at Southern Nuclear Company's (SNC) Vogtle Unit 2, performed prior to initial power operations in operating cycle 12, was successfully completed while the reactor was at least 1% {delta}K/K subcritical. The testing program used was the first application of the Subcritical Physics Testing (SPT) program developed by the Westinghouse Electric Company LLC. The SPT program centers on the application of the Westinghouse Subcritical Rod Worth Measurement (SRWM) methodology that was developed in cooperation with the Vogtle Reactor Engineering staff. The SRWM methodology received U. S. Nuclear Regulatory Commission (NRC) approval in August of 2005. The first application of the SPT program occurred at Vogtle Unit 2 in October of 2005. The results of the core design verification measurements obtained during the SPT program demonstrated excellent agreement with prediction, demonstrating that the predicted core characteristics were in excellent agreement with the actual operating characteristics of the core. This paper presents an overview of the SPT Program used at Vogtle Unit 2 during operating cycle 12, and a discussion of the critical path outage time savings the SPT program is capable of providing. (authors)

Cupp, Philip [Southern Nuclear Company (United States); Heibel, M.D. [Westinghouse Electric Company, LLC (United States)

2006-07-01T23:59:59.000Z

134

The Design of a RapidDischarge Varistor System for the MICE Magnet Circuits  

SciTech Connect (OSTI)

The need for a magnet circuit discharge system, in order to protect the magnet HTS leads during a power failure, has been discussed in recent MICE reports [1], [2]. In order to rapidly discharge a magnet, one has to put enough resistance across the lead. The resistance in this case is varistor that is put across the magnet in the event of a power outage. The resistance consists of several diodes, which act as constant voltage resistors and the resistance of the cables connecting the magnets in the circuit to each other and to the power supply. In order for the rapid discharge system to work without quenching the magnets, the voltage across the magnets must be low enough so that the diodes in the quench protection circuit don't fire and cause the magnet current to bypass the superconducting coils. It is proposed that six rapid discharge varistors be installed across the three magnet circuits the power the tracker solenoids, which are connected in series. The focusing magnets, which are also connected in series would have three varistors (one for each magnet). The coupling magnets would have a varistor for each magnet. The peak voltage that is allowed per varistor depends on the number of quench protection diodes that make up the quench protection circuit for each magnet coil circuit. It is proposed that the varistors be water cooled as the magnet circuits are being discharged through them. The water cooling circuit can be supplied with tap water. The tap water flows only when the varistor temperature reaches a temperature of 45 C.

Green, Michael A.

2008-07-23T23:59:59.000Z

135

Optoelectronics 514 Transmission Hologram Transmission Hologram  

E-Print Network [OSTI]

Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

Collins, Gary S.

136

Longitudinal Partitioning Based Waveform Relaxation Algorithm for Transient Analysis of Long Delay Transmission Lines  

E-Print Network [OSTI]

Transmission Lines Sourajeet Roy and Anestis Dounavis Department of Electrical and Computer Engineering networks. The proposed methodology represents lossy transmission lines as a cascade of lumped circuit of characteristics. This allows the transmission line to be naturally partitioned into smaller, weakly coupled

Roy, Sourajeet

137

Transmission | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

138

Superconducting flux flow digital circuits  

DOE Patents [OSTI]

A NOR/inverter logic gate circuit and a flip flop circuit implemented with superconducting flux flow transistors (SFFTs) are disclosed. Both circuits comprise two SFFTs with feedback lines. They have extremely low power dissipation, very high switching speeds, and the ability to interface between Josephson junction superconductor circuits and conventional microelectronics. 8 figs.

Hietala, V.M.; Martens, J.S.; Zipperian, T.E.

1995-02-14T23:59:59.000Z

139

Superconducting flux flow digital circuits  

DOE Patents [OSTI]

A NOR/inverter logic gate circuit and a flip flop circuit implemented with superconducting flux flow transistors (SFFTs). Both circuits comprise two SFFTs with feedback lines. They have extremely low power dissipation, very high switching speeds, and the ability to interface between Josephson junction superconductor circuits and conventional microelectronics.

Hietala, Vincent M. (Placitas, NM); Martens, Jon S. (Sunnyvale, CA); Zipperian, Thomas E. (Albuquerque, NM)

1995-01-01T23:59:59.000Z

140

Transmission lines on integrated circuits for high speed communication.  

E-Print Network [OSTI]

??As microelectronics continue to scale, the transistor delay decreases while the wire delay remains relatively constant or even increases. The wire or interconnect delay is (more)

Lee, William Scott

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Extragalactic circuits, transmission lines, and CR particle acceleration  

E-Print Network [OSTI]

A non-negligible fraction of a Supermassive Black Hole's (SMBH) rest mass energy gets transported into extragalactic space by a remarkable process in jets which are incompletely understood. What are the physical processes which transport this energy? It is likely that the energy flows electromagnetically, rather than via a particle beam flux. The deduced electromagnetic fields may produce particles of energy as high as $\\sim 10^{20}$ eV. The energetics of SMBH accretion disk models and the electromagnetic energy transfer imply that a SMBH should generate a $10^{18} - 10^{19}$ Amp\\`eres current close to the black hole and its accretion disk. We describe the so far best observation-based estimate of the magnitude of the current flow along the axis of the jet extending from the nucleus of the active galaxy in 3C303. The current is measured to be $I \\sim 10^{18}$ Amp\\`eres at $\\sim 40$ kpc away from the AGN. This indicates that organized current flow remains intact over multi-kpc distances. The electric current $...

Kronberg, Philipp P

2014-01-01T23:59:59.000Z

142

Soliton quenching NLTL impulse circuit with a pulse forming network at the output  

DOE Patents [OSTI]

An impulse forming circuit is disclosed which produces a clean impulse from a nonlinear transmission line compressed step function without customary soliton ringing by means of a localized pulse shaping and differentiating network which shunts the nonlinear transmission line output to ground.

McEwan, Thomas E. (Livermore, CA); Dallum, Gregory E. (Livermore, CA)

1998-01-01T23:59:59.000Z

143

Soliton quenching NLTL impulse circuit with a pulse forming network at the output  

DOE Patents [OSTI]

An impulse forming circuit is disclosed which produces a clean impulse from a nonlinear transmission line compressed step function without customary soliton ringing by means of a localized pulse shaping and differentiating network which shunts the nonlinear transmission line output to ground. 5 figs.

McEwan, T.E.; Dallum, G.E.

1998-09-08T23:59:59.000Z

144

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

145

Electrical Circuit Tester  

DOE Patents [OSTI]

An electrical circuit testing device is provided, comprising a case, a digital voltage level testing circuit with a display means, a switch to initiate measurement using the device, a non-shorting switching means for selecting pre-determined electrical wiring configurations to be tested in an outlet, a terminal block, a five-pole electrical plug mounted on the case surface and a set of adapters that can be used for various multiple-pronged electrical outlet configurations for voltages from 100 600 VAC from 50 100 Hz.

Love, Frank (Amarillo, TX)

2006-04-18T23:59:59.000Z

146

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Broader source: Energy.gov (indexed) [DOE]

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

147

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

148

Bioluminescent bioreporter integrated circuit  

DOE Patents [OSTI]

Disclosed are monolithic bioelectronic devices comprising a bioreporter and an OASIC. These bioluminescent bioreporter integrated circuit are useful in detecting substances such as pollutants, explosives, and heavy-metals residing in inhospitable areas such as groundwater, industrial process vessels, and battlefields. Also disclosed are methods and apparatus for environmental pollutant detection, oil exploration, drug discovery, industrial process control, and hazardous chemical monitoring.

Simpson, Michael L. (Knoxville, TN); Sayler, Gary S. (Blaine, TN); Paulus, Michael J. (Knoxville, TN)

2000-01-01T23:59:59.000Z

149

LABORATORY V ELECTRIC CIRCUITS  

E-Print Network [OSTI]

Lab V -1 LABORATORY V ELECTRIC CIRCUITS Electrical devices are the cornerstones of our modern world understanding of them. In the previous laboratory, you studied the behavior of electric fields and their effect on the motion of electrons using a cathode ray tube (CRT). This beam of electrons is one example of an electric

Minnesota, University of

150

Circuit breaker lockout device  

SciTech Connect (OSTI)

An improved lockout assembly for locking a circuit breaker in a selected off or on position is provided. The lockout assembly includes a lock block and a lock pin. The lock block has a hollow interior which fits over the free end of a switch handle of the circuit breaker. The lock block includes at least one hole that is placed in registration with a hole in the free end of the switch handle. A lock tab on the lock block serves to align and register the respective holes on the lock block and switch handle. A lock pin is inserted through the registered holes and serves to connect the lock block to the switch handle. Once the lock block and the switch handle are connected, the position of the switch handle is prevented from being changed by the lock tab bumping up against a stationary housing portion of the circuit breaker. When the lock pin installed, an apertured-end portion of the lock pin is in registration with another hole on the lock block. Then a special scissors conforming to O.S.H.A. regulations can be installed, with one or more padlocks, on the lockout assembly to prevent removal of the lock pin from the lockout assembly, thereby preventing removal of the lockout assembly from the circuit breaker.

Kozlowski, Lawrence J. (New Kensington, PA); Shirey, Lawrence A. (North Huntingdon, PA)

1992-01-01T23:59:59.000Z

151

Circuit breaker lockout device  

DOE Patents [OSTI]

An improved lockout assembly for locking a circuit breaker in a selected off or on position is provided. The lockout assembly includes a lock block and a lock pin. The lock block has a hollow interior which fits over the free end of a switch handle of the circuit breaker. The lock block includes at least one hole that is placed in registration with a hole in the free end of the switch handle. A lock tab on the lock block serves to align and register the respective holes on the lock block and switch handle. A lock pin is inserted through the registered holes and serves to connect the lock block to the switch handle. Once the lock block and the switch handle are connected, the position of the switch handle is prevented from being changed by the lock tab bumping up against a stationary housing portion of the circuit breaker. When the lock pin installed, an apertured-end portion of the lock pin is in registration with another hole on the lock block. Then a special scissors conforming to O.S.H.A. regulations can be installed, with one or more padlocks, on the lockout assembly to prevent removal of the lock pin from the lockout assembly, thereby preventing removal of the lockout assembly from the circuit breaker. 2 figs.

Kozlowski, L.J.; Shirey, L.A.

1992-11-24T23:59:59.000Z

152

Circuit breaker lockout device  

SciTech Connect (OSTI)

An improved lockout assembly for locking a circuit breaker in a selected off or on position is provided. The lockout assembly includes a lock block and a lock pin. The lock block has a hollow interior which fits over the free end of a switch handle of the circuit breaker. The lock block includes at least one hole that is placed in registration with a hole in the free end of the switch handle. A lock tab on the lock block serves to align and register the respective holes on the lock block and switch handle. A lock pin is inserted through the registered holes and serves to connect the lock block to the switch handle. Once the lock block and the switch handle are connected, the position of the switch handle is prevented from being changed by the lock tab bumping up against a stationary housing portion of the circuit breaker. When the lock pin is installed, an apertured-end portion of the lock pin is in registration with another hole on the lock block. Then a special scissors conforming to O.S.H.A. regulations can be installed, with one or more padlocks, on the lockout assembly to prevent removal of the lock pin from the lockout assembly, thereby preventing removal of the lockout assembly from the circuit breaker.

Kozlowski, L.J.; Shirey, L.A.

1991-12-31T23:59:59.000Z

153

Power system with an integrated lubrication circuit  

DOE Patents [OSTI]

A power system includes an engine having a first lubrication circuit and at least one auxiliary power unit having a second lubrication circuit. The first lubrication circuit is in fluid communication with the second lubrication circuit.

Hoff, Brian D. (East Peoria, IL); Akasam, Sivaprasad (Peoria, IL); Algrain, Marcelo C. (Peoria, IL); Johnson, Kris W. (Washington, IL); Lane, William H. (Chillicothe, IL)

2009-11-10T23:59:59.000Z

154

IEEE TRANSACTIONS ON ELECTRON DEVICES, VOL. 53, NO. 2, FEBRUARY 2006 235 De-Embedding Transmission Line Measurements for  

E-Print Network [OSTI]

of parasitic structures from transmission line measurements is presented and applied to microstrip lines technologies, integrated circuits, interconnect, losses, microstrip lines, slotted ground planes, transmission comparable to on-chip component dimensions. Hence, transmission lines play an in- creasingly vital role

Voinigescu, Sorin Petre

155

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

156

LC-circuit calorimetry  

SciTech Connect (OSTI)

We present a new type of calorimeter in which we couple an unknown heat capacity with the aid of Peltier elements to an electrical circuit. The use of an electrical inductance and an amplifier in the circuit allows us to achieve autonomous oscillations, and the measurement of the corresponding resonance frequency makes it possible to accurately measure the heat capacity with an intrinsic statistical uncertainty that decreases as {approx}t{sub m}{sup -3/2} with measuring time t{sub m}, as opposed to a corresponding uncertainty {approx}t{sub m}{sup -1/2} in the conventional alternating current method to measure heat capacities. We have built a demonstration experiment to show the feasibility of the new technique, and we have tested it on a gadolinium sample at its transition to the ferromagnetic state.

Bossen, O.; Schilling, A. [Physik-Institut der Universitaet Zuerich, Winterthurerstrasse 190, 8057 Zuerich (Switzerland)

2011-09-15T23:59:59.000Z

157

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

158

High Voltage DC Transmission 2 1.0 Introduction  

E-Print Network [OSTI]

1 High Voltage DC Transmission 2 1.0 Introduction Interconnecting HVDC within an AC system requires on use of switching devices collectively referred to in the HVDC community as valves. Valves may be non. Fig. 1 There have been three types of devices for implementing HVDC converter circuits: mercury

McCalley, James D.

159

1068 IEEE TRANSACTIONS ON VERY LARGE SCALE INTEGRATION (VLSI) SYSTEMS, VOL. 11, NO. 6, DECEMBER 2003 Equivalent-Circuit Interconnect Modeling Based on  

E-Print Network [OSTI]

-chip long interconnects that are represented as distributed RLC transmission lines. The proposed delay model transmission line model, equivalent circuit, interconnect modeling, passivity, transient simulation. I as distributed RLC transmission lines. Manuscript received December 3, 2002. This work was supported in part

Mazumder, Pinaki

160

Re: Potomac River Generating Station Department of Energy, Case No.  

Broader source: Energy.gov (indexed) [DOE]

evised plan for evised plan for transmission outages for the 230 kV circuits Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Docket No. EO-05-01. Order No. 202-07-02: Potomac Electric Power Company ("Pepco") is providing you with the following information regarding the revised plan for transmission outages for the 230 kV circuits that are scheduled during the upcoming months. In accordance with its internal procedures developed pursuant to the December 20, 2005 order in the above-captioned proceeding, Order No. 202-05-03, and pursuant to the expanded notice required in Order No. 202-07-02, issued on January 31 Order, Pepco will provide advance notification of the outages to Mirant,

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Short-Term Energy Outlook Supplement: 2013 Outlook for Gulf of Mexico Hurricane-Related Production Outages  

U.S. Energy Information Administration (EIA) Indexed Site

2013 Outlook for Gulf of Mexico 2013 Outlook for Gulf of Mexico Hurricane-Related Production Outages June 2013 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | STEO Supplement: 2013 Hurricane Outlook i This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other federal agencies. June 2013 U.S. Energy Information Administration | STEO Supplement: 2013 Hurricane Outlook 1

162

National Transmission Grid Study  

Broader source: Energy.gov (indexed) [DOE]

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

163

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

164

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan was prepared Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CTF. #12; ii #12; iii

165

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007 Investment Plan was prepared with contribution from the following Energy Commission staff and consultants Kondoleon, Chuck Najarian. 2007 Strategic Transmission Investment Plan. California Energy Commission

166

Transmission Utilization Group (TUG)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Intertie Initiatives Intertie Open Season Transmission Utilization...

167

Transmission Commercial Project Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

168

The Violin as a Circuit  

Science Journals Connector (OSTI)

The paper applies elementary circuit ideas to bowed?string instruments and their component parts. Parameters are defined and calculations based on simple circuit diagrams for the main resonance and the air resonance; curves describe their combined performance. The relative importance of circuit resistanceswood loss radiation and wall?surface lossis discussed. Wall?surface loss is an important component of air decrement. No material improvement is to be expected from change in decrement or enclosure volume.

John C. Schelleng

1963-01-01T23:59:59.000Z

169

Underground Power Transmission  

Science Journals Connector (OSTI)

...The type of transmission line for a particular...will force rt transmission lines to be ground near...history of power transmission shows that d-c...characteristics of a d-c line, it is easy to...Best data fit III II I...

P. H. Rose

1970-10-16T23:59:59.000Z

170

Omega transmission lines with applications to effective medium models of metamaterials  

Science Journals Connector (OSTI)

In this paper we introduce the concept of transmission lines with inherent bi-anisotropy and establish an analogy between these lines and volumetric bi-anisotropic materials. In particular we find under what conditions a periodically loaded transmission line can be treated as an effective omega medium. Two example circuits are introduced and analyzed. The results have two-fold implications: opening a route to emulate electromagnetic properties of bi-anisotropic omega media using transmission-line meshes and understanding and improving effective medium models of composite materials with the use of effective circuit models of unit cells.

2014-01-01T23:59:59.000Z

171

Omega Transmission Lines with Applications to Effective Medium Models of Metamaterials  

E-Print Network [OSTI]

In this paper we introduce the concept of transmission lines with inherent bi-anisotropy and establish an analogy between these lines and volumetric bi-anisotropic materials. In particular, we find under what conditions a periodically loaded transmission line can be treated as an effective omega medium. Two example circuits are introduced and analyzed. The results have two-fold implications: opening a route to emulate electromagnetic properties of bi-anisotropic omega media using transmission-line meshes and understanding and improving effective medium models of composite materials with the use of effective circuit models of unit cells.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

172

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Broader source: Energy.gov (indexed) [DOE]

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

173

Visualizations for Power System Contingency Analysis Data  

E-Print Network [OSTI]

arrangement. A typical CA models single element outage (one-transmission line or one-generator outage), multiple-element outage (two-transmission line outage, one transmission line and one generator outage, etc element outage contingency. Similar results for transmission element flow values were presented in [3

174

Vice President, Transmission Marketing & Sales  

Broader source: Energy.gov [DOE]

Within Transmission Services at Bonneville Power Administration (BPA), Transmission Marketing and Sales (TS) provides open access to the Federal Transmission System (FTS) consistent with...

175

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

176

Fiber optic sensors for monitoring sodium circuits and power grid cables  

SciTech Connect (OSTI)

At Kalpakkam, India, a programme on development of Raman Distributed Temperature sensor (RDTS) for Fast Breeder Reactors (FBR) application is undertaken. Leak detection in sodium circuits of FBR is critical for the safety and performance of the reactors. It is demonstrated that RDTS can be usefully employed in monitoring sodium circuits and in tracking the percolating sodium in case of any leak. Aluminum Conductor Steel Reinforced (ACSR) cable is commonly used as overhead power transmission cable in power grid. A second application demonstrates the suitability of using RDTS to monitor this transmission cable for any defect. (authors)

Kasinathan, M.; Sosamma, S.; Pandian, C.; Vijayakumar, V.; Chandramouli, S.; Nashine, B. K.; Rao, C. B.; Murali, N.; Rajan, K. K.; Jayakumar, T. [IGCAR, Kalpakkam (India)

2011-07-01T23:59:59.000Z

177

Analog Circuit Design Spring 2008  

E-Print Network [OSTI]

Circuits, 3rd ed., McGraw Hill, 2002. Topics: 1. Op amp fundamentals (1 class period) 2. Op amp circuits honesty policy is fully described in the student handbook, and students are fully expected to adhere to it to an F for the course grade, and will be administered according to the student handbook. Class notes

Joiner, Laurie L.

178

NEURAL CIRCUITS ORIGINAL RESEARCH ARTICLE  

E-Print Network [OSTI]

NEURAL CIRCUITS ORIGINAL RESEARCH ARTICLE published: 14 May 2010 doi: 10.3389/fncir.2010.00013 Frontiers in Neural Circuits www.frontiersin.org May 2010 | Volume 4 | Article 13 | 1 Signal processing a more holistic standpoint (Roberts, 1979; Bialek et al., 1991). For a continuously firing cell

Trauner, Dirk

179

Modeling cortical circuits.  

SciTech Connect (OSTI)

The neocortex is perhaps the highest region of the human brain, where audio and visual perception takes place along with many important cognitive functions. An important research goal is to describe the mechanisms implemented by the neocortex. There is an apparent regularity in the structure of the neocortex [Brodmann 1909, Mountcastle 1957] which may help simplify this task. The work reported here addresses the problem of how to describe the putative repeated units ('cortical circuits') in a manner that is easily understood and manipulated, with the long-term goal of developing a mathematical and algorithmic description of their function. The approach is to reduce each algorithm to an enhanced perceptron-like structure and describe its computation using difference equations. We organize this algorithmic processing into larger structures based on physiological observations, and implement key modeling concepts in software which runs on parallel computing hardware.

Rohrer, Brandon Robinson; Rothganger, Fredrick H.; Verzi, Stephen J.; Xavier, Patrick Gordon

2010-09-01T23:59:59.000Z

180

Demultiplexer circuit for neural stimulation  

DOE Patents [OSTI]

A demultiplexer circuit is disclosed which can be used with a conventional neural stimulator to extend the number of electrodes which can be activated. The demultiplexer circuit, which is formed on a semiconductor substrate containing a power supply that provides all the dc electrical power for operation of the circuit, includes digital latches that receive and store addressing information from the neural stimulator one bit at a time. This addressing information is used to program one or more 1:2.sup.N demultiplexers in the demultiplexer circuit which then route neural stimulation signals from the neural stimulator to an electrode array which is connected to the outputs of the 1:2.sup.N demultiplexer. The demultiplexer circuit allows the number of individual electrodes in the electrode array to be increased by a factor of 2.sup.N with N generally being in a range of 2-4.

Wessendorf, Kurt O; Okandan, Murat; Pearson, Sean

2012-10-09T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Parallel VLSI Circuit Analysis and Optimization  

E-Print Network [OSTI]

CAD application addressed in this dissertation is the Simulation Program with Integrated Circuit Emphasis (SPICE) like circuit simulation. SPICE simulation is often regarded as the bottleneck of the design flow. Recently, parallel circuit simulation...

Ye, Xiaoji

2012-02-14T23:59:59.000Z

182

A Novel Design of Balun using Left-Handed Transmission Line *Seungjun Lee, **Jong-Sik Lim, *Hoe-sung Yang, and *Sangwook Nam  

E-Print Network [OSTI]

A Novel Design of Balun using Left-Handed Transmission Line *Seungjun Lee, **Jong-Sik Lim, *Hoe circuits. More recently, a theory and implementation of a compact and practical LH-transmission line was developed by Caloz et al [5]. The LH-transmission line is the electrically dual of the conventional

Nam, Sangwook

183

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

184

Stream Control Transmission Protocol  

Science Journals Connector (OSTI)

This document describes the Stream Control Transmission Protocol (SCTP). SCTP is designed to transport PSTN signaling messages over IP networks, but is capable of broader applications.

R. Stewart; Q. Xie; K. Morneault; C. Sharp; H. Schwarzbauer; T. Taylor; I. Rytina; M. Kalla; L. Zhang; V. Paxson

2000-10-01T23:59:59.000Z

185

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

186

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

187

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |  

Broader source: Energy.gov (indexed) [DOE]

80: Big Bend to Witten Transmission Line Project, South Dakota 80: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with DOE's Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download April 12, 2011

188

SAS Output  

Gasoline and Diesel Fuel Update (EIA)

B. U.S. Transformer Outages by Type and NERC region, 2012 Outage Type Eastern Interconnection TRE WECC Contiguous U.S. Circuit Outage Counts Automatic Outages (Sustained) 16.00 --...

189

Superconductive tunnel junction integrated circuit  

SciTech Connect (OSTI)

Josephson Junction integrated circuits of the current injection type and magnetically controlled type utilize a superconductive layer that forms both Josephson Junction electrode for the Josephson Junction devices on the integrated circuit as well as a ground plane for the integrated circuit. Large area Josephson Junctions are utilized for effecting contact to lower superconductive layers and islands are formed in superconductive layers to provide isolation between the groundplane function and the Josephson Junction electrode function as well as to effect crossovers. A superconductor-barrier-superconductor trilayer patterned by local anodization is also utilized with additional layers formed thereover. Methods of manufacturing the embodiments of the invention are disclosed.

Jillie, D.W. Jr.; Smith, L.N.

1984-02-07T23:59:59.000Z

190

Microsoft Word - PoRiver Project Schedule - Letter to DOE_042807.doc  

Broader source: Energy.gov (indexed) [DOE]

30, 2007 30, 2007 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Project Outage Schedule Clarification Dear Mr. Mansueti: I am writing to clarify the upcoming outage schedule for the Potomac River project and to explain certain discrepancies that are present in Pepco's most recent communications. 1 The monthly status report submitted to the Federal Energy Regulatory Commission ("FERC") on April 16, 2007 shows the upcoming outages for the two additional transmission circuits as May 1, 2007 through May 21, 2007 (Circuit 1) and as May 24, 2007 through June 21, 2007 (Circuit 2). In an e-mail sent by Steve Alexander on April 27, 2007, Pepco reflected the current outage schedule for Circuit 1.

191

THREE DIMENSIONAL VISUALIZATIONS FOR POWER SYSTEM CONTINGENCY ANALYSIS VOLTAGE DATA  

E-Print Network [OSTI]

arrangement. A typical CA models single element outage (one-transmission line or one-generator outage), multiple-element outage (two-transmission line outage, one transmission line and one generator outage, etc data. We visualize vulnerability levels of buses and severity information of outages separately

192

Emerging WiFi Direct technique in home area networks for Smart Grid: Power consumption and outage performance  

Science Journals Connector (OSTI)

Abstract Considering the power saving potential of the emerging WiFi Direct technique, we evaluate the performance of WiFi Direct technique in Home Area Networks (HANs) for Smart Grid communication from two aspects: power consumption and downlink outage performance. By modeling the traffic intensity and the number of working devices in a dynamic HAN as a Markov chain, the power consumption of the dynamic HAN with Power Saving Mechanism (PSM) and the conventional static HAN with Continuous Active Mode (CAM) are evaluated and compared. On the other hand, the probability density function (PDF) of the signal to interference and noise ratio (SINR) for the active user connected in the HAN is derived from the amplitude distribution property of the classical indoor SalehValenzuela (SV) channel. The numerical results show that WiFi Direct technique not only improves the power saving in the HAN for Smart Grid, but also enhances the reliability of HAN communications for Smart Grid.

Zhuo Li; Qilian Liang; Xiuzhen Cheng

2014-01-01T23:59:59.000Z

193

Transmission Line Security Monitor  

SciTech Connect (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

194

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

195

Single transmission line interrogated multiple channel data acquisition system  

DOE Patents [OSTI]

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensor circuits each monitors a specific process variable and each transmits measurement values over a single transmission line to a master interrogating station when addressed by said master interrogating station. Typically, as many as 330 remote stations may be parallel connected to the transmission line which may exceed 7,000 feet. The interrogation rate is typically 330 stations/second. The master interrogating station samples each station according to a shared, charging transmit-receive cycle. All remote station address signals, all data signals from the remote stations/sensors and all power for all of the remote station/sensors are transmitted via a single continuous terminated coaxial cable. A means is provided for periodically and remotely calibrating all remote sensors for zero and span. A provision is available to remotely disconnect any selected sensor station from the main transmission line.

Fasching, George E. (Morgantown, WV); Keech, Jr., Thomas W. (Morgantown, WV)

1980-01-01T23:59:59.000Z

196

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

SciTech Connect (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

197

Reverse engineering of integrated circuits  

DOE Patents [OSTI]

Software and a method therein to analyze circuits. The software comprises several tools, each of which perform particular functions in the Reverse Engineering process. The analyst, through a standard interface, directs each tool to the portion of the task to which it is most well suited, rendering previously intractable problems solvable. The tools are generally used iteratively to produce a successively more abstract picture of a circuit, about which incomplete a priori knowledge exists.

Chisholm, Gregory H. (Shorewood, IL); Eckmann, Steven T. (Colorado Springs, CO); Lain, Christopher M. (Pittsburgh, PA); Veroff, Robert L. (Albuquerque, NM)

2003-01-01T23:59:59.000Z

198

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

199

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Broader source: Energy.gov (indexed) [DOE]

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

200

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Broader source: Energy.gov (indexed) [DOE]

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Transmission Access Resources  

Broader source: Energy.gov [DOE]

Historically, the addition of new electric generation facilities has been accompanied by new transmission systems. For example, large nuclear and coal plants built in the 1960s and 1970s required...

202

Performance Incentives for Transmission  

E-Print Network [OSTI]

The Federal Energy Regulatory Commission's Standard Market Design Notice of Public Rule- making (SMD NOPRPerformance Incentives for Transmission FERC's Standard Market Design should accommodate of California at Berkeley. The research described in this article was supported by National Grid, USA

Oren, Shmuel S.

203

Designing electricity transmission auctions  

E-Print Network [OSTI]

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

204

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

205

Audio Transmission Systems  

Science Journals Connector (OSTI)

Audio transmission systems are the means by which audio signals are routed, processed, and assigned to the desired monitor and recording output channels. In the early days of electrical recording, rarely more ...

John Eargle

1986-01-01T23:59:59.000Z

206

Transmission Grid Integration  

Broader source: Energy.gov [DOE]

The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

207

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota  

Broader source: Energy.gov [DOE]

The USDA Rural Utilities Service, with DOEs Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1).)

208

Honda Transmission Technical Center  

High Performance Buildings Database

Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

209

Transmission Right Of Way  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

210

Open Access Transmission Tariff  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

211

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

Agencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary General Transmission...

212

National Electric Transmission Congestion Study Webinars | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

213

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

214

Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.  

SciTech Connect (OSTI)

Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

215

Electricity Transmission, A Primer | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

216

Vertically Integrated Circuits at Fermilab  

SciTech Connect (OSTI)

The exploration of the vertically integrated circuits, also commonly known as 3D-IC technology, for applications in radiation detection started at Fermilab in 2006. This paper examines the opportunities that vertical integration offers by looking at various 3D designs that have been completed by Fermilab. The emphasis is on opportunities that are presented by through silicon vias (TSV), wafer and circuit thinning and finally fusion bonding techniques to replace conventional bump bonding. Early work by Fermilab has led to an international consortium for the development of 3D-IC circuits for High Energy Physics. The consortium has submitted over 25 different designs for the Fermilab organized MPW run organized for the first time.

Deptuch, Grzegorz; Demarteau, Marcel; Hoff, James; Lipton, Ronald; Shenai, Alpana; Trimpl, Marcel; Yarema, Raymond; Zimmerman, Tom; /Fermilab

2009-01-01T23:59:59.000Z

217

Nuclear sensor signal processing circuit  

DOE Patents [OSTI]

An apparatus and method are disclosed for a compact and temperature-insensitive nuclear sensor that can be calibrated with a non-hazardous radioactive sample. The nuclear sensor includes a gamma ray sensor that generates tail pulses from radioactive samples. An analog conditioning circuit conditions the tail-pulse signals from the gamma ray sensor, and a tail-pulse simulator circuit generates a plurality of simulated tail-pulse signals. A computer system processes the tail pulses from the gamma ray sensor and the simulated tail pulses from the tail-pulse simulator circuit. The nuclear sensor is calibrated under the control of the computer. The offset is adjusted using the simulated tail pulses. Since the offset is set to zero or near zero, the sensor gain can be adjusted with a non-hazardous radioactive source such as, for example, naturally occurring radiation and potassium chloride.

Kallenbach, Gene A. (Bosque Farms, NM); Noda, Frank T. (Albuquerque, NM); Mitchell, Dean J. (Tijeras, NM); Etzkin, Joshua L. (Albuquerque, NM)

2007-02-20T23:59:59.000Z

218

Comparison of reliability performance of group connected and conventional HVDC transmission systems  

SciTech Connect (OSTI)

A group connected HVDC transmission scheme is a variant of the unit connection where instead of a single generator, a group of generators are directly connected to the converter. Studies conducted in the past indicated that significant cost reduction can be achieved using this scheme. This is mainly due to the elimination of many components which results in considerable capital and operating cost savings to the utility. Concerns regarding the reliability performance of unit connected schemes were raised, however, there has not been a detailed reliability study conducted. This paper addresses the reliability evaluation aspect of a group connected scheme and compares the reliability performance of the group connected scheme with that of the conventional common collector system. Reliability models for both schemes were developed using a hypothetical system model based on the Nelson River system. Practical system component outage data was used to examine the reliability performance of both schemes.

Kuruganty, S. [Univ. of North Dakota, Grand Forks, ND (United States). Dept. of Electrical Engineering] [Univ. of North Dakota, Grand Forks, ND (United States). Dept. of Electrical Engineering

1995-10-01T23:59:59.000Z

219

EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission  

Broader source: Energy.gov (indexed) [DOE]

EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Summary Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69-kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing

220

EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission  

Broader source: Energy.gov (indexed) [DOE]

00: Granby Pumping Plant Switchyard-Windy Gap Substation 00: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Summary Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69-kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Hybrid Transmission Corridor study  

SciTech Connect (OSTI)

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

222

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

223

NREL: Energy Analysis: Transmission Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

224

Abstract -In this paper, new formulations for the energy dissipation of lossy transmission lines driven by CMOS inverters are provided, and a new performance metric for the energy optimization under the delay  

E-Print Network [OSTI]

Abstract - In this paper, new formulations for the energy dissipation of lossy transmission lines for the driving-point impedance of lossy coupled transmission lines which itself is derived by solving Telegra stable circuits that are capable of modeling the transmission line for a broad range of frequencies

Pedram, Massoud

225

Electric Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

226

10-Yr. Transmission Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

227

Vertical Circuits Inc | Open Energy Information  

Open Energy Info (EERE)

Circuits Inc Circuits Inc Jump to: navigation, search Name Vertical Circuits, Inc. Place Scotts Valley, California Zip 95066 Sector Services Product Vertical Circuits Inc. is a global supplier of advanced die level vertical interconnect packaging technology, products, services and intellectual property for the manufacture of low cost ultra high-speed/high-density semiconductor components. References Vertical Circuits, Inc.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Vertical Circuits, Inc. is a company located in Scotts Valley, California . References ↑ "Vertical Circuits, Inc." Retrieved from "http://en.openei.org/w/index.php?title=Vertical_Circuits_Inc&oldid=352802"

228

Circuit Optimization Using Efficient Parallel Pattern Search  

E-Print Network [OSTI]

Circuit optimization is extremely important in order to design today's high performance integrated circuits. As systems become more and more complex, traditional optimization techniques are no longer viable due to the complex and simulation...

Narasimhan, Srinath S.

2011-08-08T23:59:59.000Z

229

Refinery Outages: Fall 2014  

U.S. Energy Information Administration (EIA) Indexed Site

well- supplied with middle distillate fuel oil, not only from Europe but also from Russia, India and the Middle East. As a result, planned maintenance this fall at Eastern...

230

DNA Hybridization Catalysts and Catalyst Circuits  

E-Print Network [OSTI]

blocks for a synthetic DNA-based circuit. While ri- bozymes are the best known example of nucleic acids

Winfree, Erik

231

SYSTEMATIC SYNTHESIS METHOD FOR ANALOGUE CIRCUITS PART III ALL-TRANSISTOR CIRCUIT SYNTHESIS  

E-Print Network [OSTI]

SYSTEMATIC SYNTHESIS METHOD FOR ANALOGUE CIRCUITS ­ PART III ALL-TRANSISTOR CIRCUIT SYNTHESIS David papers (subtitled Parts I and II) together present a systematic synthesis method for analogue circuits. This paper illustrates the synthesis method by deriving and analysing some known all- transistor circuits

Papavassiliou, Christos

232

Improved Simulation of Stabilizer Circuits Scott Aaronson #  

E-Print Network [OSTI]

Improved Simulation of Stabilizer Circuits Scott Aaronson # University of California, Berkeley---that is, a quantum circuit con­ sisting solely of CNOT, Hadamard, and phase gates---can be simulated e that stabilizer circuits are probably not even universal for classical computation. Third, we give e

Aaronson, Scott

233

Integrated Circuit / Microfluidic Chips for Dielectric Manipulation  

E-Print Network [OSTI]

Integrated Circuit / Microfluidic Chips for Dielectric Manipulation A THESIS PRESENTED BY THOMAS by Thomas Hunt All rights reserved. #12;iii Abstract Integrated Circuit / Microfluidic Chips for Dielectric of integrated circuit / microfluidic chips to move individual living cells and chemical droplets along

Heller, Eric

234

Voltage, energy and power in electric circuits  

E-Print Network [OSTI]

Voltage, energy and power in electric circuits Science teaching unit #12;Disclaimer The Department-2008DVD-EN Voltage, energy and power in electric circuits #12;#12;© Crown copyright 2008 1The National Strategies | Secondary Voltage, energy and power in electric circuits 00094-2008DVD-EN Contents Voltage

Berzins, M.

235

The Ideal Transformer Description and Circuit Symbol  

E-Print Network [OSTI]

The Ideal Transformer Description and Circuit Symbol As with all the other circuit elements, there is a physical transformer commonly used in circuits whose behavior can be discussed in great detail. However, in many cases the practical transformer can be adequately approximated by the "ideal transformer," which

King, Roger

236

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-34) (12/3/01)  

Broader source: Energy.gov (indexed) [DOE]

3, 2001 3, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-34) Bill Erickson - TFP/Walla Walla Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the McNary-Ross Transmission Line ROW between 152/3+2120 to 153/4. The line is 345 kV Single Circuit Transmission Line (project includes adjacent N. Bonneville-Ross 230 kV Single Circuit Transmission Line) having a combined easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Skamania County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA).

237

Transmission SEAB Presentation  

Broader source: Energy.gov (indexed) [DOE]

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

238

Continuously variable transmission  

SciTech Connect (OSTI)

This patent describes a power transmission apparatus. It comprises: a body, a pinion gear, a cam means, first and second gear rack pairs, preventing means;l first and second rack support means, a rotor mounted for rotation about a rotor axis, the rotor having rotor engaging means for engaging the rack support means so as to transmit power therebetween.

Irvin, P.J.E.

1992-07-14T23:59:59.000Z

239

Autonomous data transmission apparatus  

DOE Patents [OSTI]

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

240

Borehole data transmission apparatus  

DOE Patents [OSTI]

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Design of bulk thermoelectric modules for integrated circuit thermal management  

E-Print Network [OSTI]

Index TermsContact resistance, equivalent circuit models,1-D equivalent circuit model. When the thermal resistance

Fukutani, K; Shakouri, A

2006-01-01T23:59:59.000Z

242

EIS-0141: Washington Water Power/B.C. Hydro Transmission Interconnection Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy developed this statement to evaluate the environmental impacts of constructing and operating a double-circuit 230-kilovolt electrical transmission line that would link the electrical systems of the Washington Water Power Company and the British Columbia Hydro and Power Authority.

243

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

244

Ionization tube simmer current circuit  

DOE Patents [OSTI]

A highly efficient flash lamp simmer current circuit utilizes a fifty percent duty cycle square wave pulse generator to pass a current over a current limiting inductor to a full wave rectifier. The DC output of the rectifier is then passed over a voltage smoothing capacitor through a reverse current blocking diode to a flash lamp tube to sustain ionization in the tube between discharges via a small simmer current. An alternate embodiment of the circuit combines the pulse generator and inductor in the form of an FET off line square wave generator with an impedance limited step up output transformer which is then applied to the full wave rectifier as before to yield a similar simmer current.

Steinkraus, Jr., Robert F. (Livermore, CA)

1994-01-01T23:59:59.000Z

245

Ionization tube simmer current circuit  

DOE Patents [OSTI]

A highly efficient flash lamp simmer current circuit utilizes a fifty percent duty cycle square wave pulse generator to pass a current over a current limiting inductor to a full wave rectifier. The DC output of the rectifier is then passed over a voltage smoothing capacitor through a reverse current blocking diode to a flash lamp tube to sustain ionization in the tube between discharges via a small simmer current. An alternate embodiment of the circuit combines the pulse generator and inductor in the form of an FET off line square wave generator with an impedance limited step up output transformer which is then applied to the full wave rectifier as before to yield a similar simmer current. 6 figures.

Steinkraus, R.F. Jr.

1994-12-13T23:59:59.000Z

246

Definition: Automated Distribution Circuit Switches | Open Energy  

Open Energy Info (EERE)

Circuit Switches Circuit Switches Jump to: navigation, search Dictionary.png Automated Distribution Circuit Switches Distribution circuit switches that can be operated automatically in response to control signals from local sensors, distribution automation systems, or grid control systems. Such switches can be installed as automated devices or existing equipment can be retrofitted with controls and communications. The degree of automation depends on the controls and communications system implemented. These switches can be opened or closed to isolate portions of a distribution circuit that has experienced a short circuit (fault), or must be taken out of service for maintenance or other operations. When used in combination, these switches can reroute power from other substations or nearby distribution circuits.[1]

247

Abstract -In this paper, new formulations for the energy dissipation of lossy transmission lines driven by CMOS inverters are provided. These  

E-Print Network [OSTI]

inverter inputs. To accomplish this task, a new stable circuit that is capable of modeling the transmission enabling a host of new and powerful applications. Recent studies on the effects caused by the nanometerAbstract - In this paper, new formulations for the energy dissipation of lossy transmission lines

Heydari, Payam

248

Transmission Developers Inc.  

Broader source: Energy.gov (indexed) [DOE]

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

249

Transmission Siting_071508.indd  

Broader source: Energy.gov (indexed) [DOE]

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

250

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

251

Patterns of Transmission Investment  

E-Print Network [OSTI]

long term performance contracts with a developer of an HVDC transmission link to expand interconnection capacity between TSOs with no or limited interconnections and with large sustained differences in prices. Merchant investments supported... truly separate AC networks. For example, by building HVDC inter-connectors between two separate networks, opportunities to increase trades of power from high price to low priced areas can be exploited. The HVDC link between the England and France...

Joskow, Paul

2006-03-14T23:59:59.000Z

252

Pepco Update on Current Construction Work and Mirant Generation Needs for  

Broader source: Energy.gov (indexed) [DOE]

Update on Current Construction Work and Mirant Generation Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage Docket No. EO-05-01. Pepco needs the following to occur to provide necessary reliability to the central D.C. area during this scheduled June outage in order to complete installation of new transmission circuits to serve the central D.C. area. The situations that we would expect generation support for this outage are as follows: Two 230 KV lines in service: 264 MW generation to protect against the loss of one 230KV line. One 230KV line in service (i.e., one of the two lines has experienced an outage): 264 MW generation is required, with an additional

253

Boardman to Hemingway Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

254

EA-1899: Rerouting and Renovating of Estes-Flatiron Three Transmission  

Broader source: Energy.gov (indexed) [DOE]

99: Rerouting and Renovating of Estes-Flatiron Three 99: Rerouting and Renovating of Estes-Flatiron Three Transmission Lines to Double Circuit 115-kV, Larimer County, Colorado EA-1899: Rerouting and Renovating of Estes-Flatiron Three Transmission Lines to Double Circuit 115-kV, Larimer County, Colorado Summary DOE's Western Area Power Administration started to prepare an EA to evaluate the environmental impacts of a proposal to reroute and renovate the Estes-Flatiron Three Transmission Lines in Larimer County, Colorado. Based on comments received during the scoping period, Western ended preparation of DOE/EA-1899 and announced its intent to prepare an environmental impact statement, DOE/EIS-0483. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

255

Effect of resonance in external radio-frequency circuit on very high frequency plasma discharge  

SciTech Connect (OSTI)

A fully electromagnetic plasma model for an asymmetric capacitively coupled plasma discharge is used to understand the interaction between the external radio-frequency (rf) distributed circuit and the plasma. The plasma is excited using a 150 MHz rf source connected to the top electrode, the bottom electrode is connected to a shorted transmission line, and the electrodes are separated from the chamber walls through dielectric rings. Under typical conditions, the electron density peaks in the center of the plasma chamber due to the standing electromagnetic wave and the rf current from the top electrode primarily returns through the bottom electrode. When the electrical length of the bottom transmission line is adjusted such that it presents a large (open-circuit) impedance at the plasma chamber interface, the rf return current shifts from the bottom electrode to the chamber wall. As a consequence, the peak in electron density also moves from the center of the chamber toward its outer periphery.

Rauf, Shahid; Chen Zhigang; Collins, Ken [Applied Materials, Inc., 974 E. Arques Avenue, M/S 81517 Sunnyvale, California 94085 (United States)

2010-05-15T23:59:59.000Z

256

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

257

Transmission/Photo Gallery | Open Energy Information  

Open Energy Info (EERE)

Colorado transmission 2.jpg Bird diverters.jpg Transmission insulators.jpg Retrieved from "http:en.openei.orgwindex.php?titleTransmissionPhotoGallery&oldid687595...

258

A circuit model of the temporal pattern generator of Caenorhabditis egg-laying behavior  

E-Print Network [OSTI]

establish a negative feedback loop, where depolarization of VC causes egg-laying, which in turn causes termination of the calcium transient and repolarization of the VC neu- ron. VC inhibits HSN in the short term Previous work indicated that the VC... calcium-sensitive fluorescent dyes, giving us an opportunity to directly monitor the transmission and integration of signals in the circuit. Furthermore, mutants with defects in individual cells make it possible to dis- criminate correlated excitation from...

Zhang, Mi; Schafer, William R; Breitling, Rainer

2010-06-07T23:59:59.000Z

259

NREL: Transmission Grid Integration - Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

260

Electric Transmission Line Siting Compact  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Transmission Workshop | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

262

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network [OSTI]

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

263

Circuit considerations for repetitive railguns  

SciTech Connect (OSTI)

Railgun electromagnetic launchers have significant military and scientific potential. They provide direct conversion of electrical energy to projectile kinetic energy, and they offer the hope of achieving projectile velocities greatly exceeding the limits of conventional guns. With over 10 km/sec already demonstrated, railguns are attracting attention for tactical and strategic weapons systems and for scientific equation-of-state research. The full utilization of railguns will require significant improvements in every aspect of system design - projectile, barrel, and power source - to achieve operation on a large scale. This paper will review fundamental aspects of railguns, with emphasis on circuit considerations and repetitive operation.

Honih, E.M.

1986-01-01T23:59:59.000Z

264

Polysilicon photoconductor for integrated circuits  

DOE Patents [OSTI]

A photoconductive element of polycrystalline silicon is provided with intrinsic response time which does not limit overall circuit response. An undoped polycrystalline silicon layer is deposited by LPCVD to a selected thickness on silicon dioxide. The deposited polycrystalline silicon is then annealed at a selected temperature and for a time effective to obtain crystal sizes effective to produce an enhanced current output. The annealed polycrystalline layer is subsequently exposed and damaged by ion implantation to a damage factor effective to obtain a fast photoconductive response. 6 figs.

Hammond, R.B.; Bowman, D.R.

1989-04-11T23:59:59.000Z

265

The Centre for Power Transmission  

E-Print Network [OSTI]

circuit in which linear actuators act as pump, and a hydraulic motor drives an electric generator buoy and waves, and load characteristics of generators connected to an electrical grid must

Burton, Geoffrey R.

266

Circuit reconstruction tools today Stephen J Smith  

E-Print Network [OSTI]

Circuit reconstruction tools today Stephen J Smith To understand how a brain processes information, Stanford University School of Medicine, Stanford, CA 94305, United States Corresponding author: Smith

Born, Richard

267

Abstract --Under a context of transmission open access, a methodology to define a common transmission trunk system  

E-Print Network [OSTI]

Terms--Transmission systems, Transmission pricing, Cooperative games, Shapley value, Transmission open

Catholic University of Chile (Universidad Católica de Chile)

268

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Equipment Transmission Lines 765 kV (no description) 500Montana-Alberta Tie 230 kV Transmission Line: TransmissionMontana-Alberta Tie 230 kV Transmission Line: Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

269

National Electric Transmission Congestion Study: Preliminary...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study: Preliminary Findings National Electric Transmission Congestion Study: Preliminary Findings The Department hosted three webinars in...

270

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery...

271

Dynamic Transmission Electron Microscopy  

SciTech Connect (OSTI)

Dynamic transmission electron microscopy (DTEM) combines the benefits of high spatial resolution electron microscopy with the high temporal resolution of ultrafast lasers. The incorporation of these two components into a single instrument provides a perfect platform for in situ observations of material processes. However, previous DTEM applications have focused on observing structural changes occurring in samples exposed to high vacuum. Therefore, in order to expand the pump-probe experimental regime to more natural environmental conditions, in situ gas and liquid chambers must be coupled with Dynamic TEM. This chapter describes the current and future applications of in situ liquid DTEM to permit time-resolved atomic scale observations in an aqueous environment, Although this chapter focuses mostly on in situ liquid imaging, the same research potential exists for in situ gas experiments and the successful integration of these techniques promises new insights for understanding nanoparticle, catalyst and biological protein dynamics with unprecedented spatiotemporal resolution.

Evans, James E.; Jungjohann, K. L.; Browning, Nigel D.

2012-10-12T23:59:59.000Z

272

Probabilistic Approach to Quantifying the Contribution of Variable Generation and Transmission to System Reliability: Preprint  

SciTech Connect (OSTI)

The increasing electrical load served by variable generation (VG), such as wind and solar energy, in the United States and many other countries has stimulated an interesting line of research to better quantify the capacity value of these resources. Methods applied traditionally to thermal units based on their average outage rates do not apply to VG because of their uncertain and non-dispatchable nature. The North American Electric Reliability Corporation's Integration of Variable Generation Task Force recently released a report that highlighted the need to develop and benchmark underlying loss-of-load expectation and related metrics that reasonably and fairly calculate the contribution to planning reserves, or capacity value, of solar and wind power. As the fraction of generation coming from VG becomes more significant, their estimated capacity value will have a larger impact on system planning. In this paper, we provide a method to include VG in traditional probabilistic-based adequacy methods. This method has been implemented in the Renewable Energy Probabilistic Resource Assessment tool developed at the National Renewable Energy Laboratory. Through an example based on the U.S. Western Interconnection, this method is applied to assess the effect that transmission can have on resource adequacy. We also analyze the interactions between available transmission and capacity value for VG.

Ibanez, E.; Milligan, M.

2012-09-01T23:59:59.000Z

273

Enhancement of Time-Reversal Subwavelength Wireless Transmission Using Pulse Shaping  

E-Print Network [OSTI]

A novel time-reversal subwavelength transmission technique, based on pulse shaping circuits (PSCs), is proposed. Compared to previously reported approaches, this technique removes the need for complex or electrically large electromagnetic structures by generating channel diversity via pulse shaping instead of angular spectrum transformation. Moreover, the pulse shaping circuits (PSCs) are based on Radio Analog Signal Processing (R-ASP), and therefore do not suffer from the well-known issues of digital signal processing in ultrafast regimes. The proposed PSC time-reversal systems is mathematically shown to offer high channel discrimination under appropriate PSC design conditions, and is experimentally demonstrated for the case of two receivers.

Ding, Shuai; Zou, Lianfeng; Wang, Bingzhong; Caloz, Christophe

2014-01-01T23:59:59.000Z

274

Circuit breaker monitoring application using wireless communication  

E-Print Network [OSTI]

Circuit breakers are used in the power system to break or make current flow through power apparatus. Reliable operation of circuit breakers is critical to the well- being of the power system and can be achieved by regular inspection and maintenance...

Ved, Nitin

2007-04-25T23:59:59.000Z

275

A Spatial Computing Architecture Implementing Computation Circuits  

E-Print Network [OSTI]

A Spatial Computing Architecture for Implementing Computation Circuits David Grant Supervisor: Dr Architecture Tools Preliminary Results Conclusions #12;3 Introduction Computational Circuits Software MB of memory ­ Add a few million gates ??? #12;5 Architecture and Tools to implement computational

Lemieux, Guy

276

www.plusplasticelectronics.com THE CIRCUIT  

E-Print Network [OSTI]

www.plusplasticelectronics.com THE CIRCUIT + SMART FABRICS 2011 + SMART TEXTILES SALON watch NANOMATERIALS IN PRINTED ELECTRONICS The circuit SMART FABRICS 2011 SMART TEXTILES SALON in Physics in 2010 for their discovery of graphene, an ultra-thin carbon material with extraordinary

Aksay, Ilhan A.

277

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION  

Broader source: Energy.gov [DOE]

The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

278

Transmission Reliability | Department of Energy  

Energy Savers [EERE]

design, long-term supply and transmission investment, renewable integration, demand response, and environmental impacts. Researchers use models and simulations to assess how...

279

NREL: Transmission Grid Integration - Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects NREL's transmission integration projects provide data and models that help utilities and policymakers make informed decisions about the integration of variable generation,...

280

Deutsch Algorithm on Classical Circuits  

E-Print Network [OSTI]

The well-known Deutsch Algorithm (DA) and Deutsch-Jozsha Algorithm (DJA) both are used as an evidence to the power of quantum computers over classical computation mediums. In these theoretical experiments, it has been shown that a quantum computer can find the answer with certainty within a few steps although classical electronic systems must evaluate more iterations than quantum computer. In this paper, it is shown that a classical computation system formed by using ordinary electronic parts may perform the same task with equal performance than quantum computers. DA and DJA quantum circuits act like an analog computer, so it is unfair to compare the bit of classical digital computers with the qubit of quantum computers. An analog signal carrying wire will of course carry more information that a bit carrying wire without serial communication protocols.

Osman Kaan Erol

2008-03-21T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Sequential power-up circuit  

DOE Patents [OSTI]

A sequential power-up circuit for starting several electrical load elements in series to avoid excessive current surge, comprising a voltage ramp generator and a set of voltage comparators, each comparator having a different reference voltage and interfacing with a switch that is capable of turning on one of the load elements. As the voltage rises, it passes the reference voltages one at a time and causes the switch corresponding to that voltage to turn on its load element. The ramp is turned on and off by a single switch or by a logic-level electrical signal. The ramp rate for turning on the load element is relatively slow and the rate for turning the elements off is relatively fast. Optionally, the duration of each interval of time between the turning on of the load elements is programmable. 2 figs.

Kronberg, J.W.

1992-06-02T23:59:59.000Z

282

Reusable vibration resistant integrated circuit mounting socket  

DOE Patents [OSTI]

This invention discloses a novel form of socket for integrated circuits to be mounted on printed circuit boards. The socket uses a novel contact which is fabricated out of a bimetallic strip with a shape which makes the end of the strip move laterally as temperature changes. The end of the strip forms a barb which digs into an integrated circuit lead at normal temperatures and holds it firmly in the contact, preventing loosening and open circuits from vibration. By cooling the contact containing the bimetallic strip the barb end can be made to release so that the integrated circuit lead can be removed from the socket without damage either to the lead or to the socket components.

Evans, Craig N. (Irwin, PA)

1995-01-01T23:59:59.000Z

283

Low voltage amplifier architecture for high speed switched capacitor circuits  

E-Print Network [OSTI]

This work concentrates on circuit realization of high speed and low voltage switched capacitor circuits, with emphasis on the operational transconductance amplifier (OTA). An overview of switched capacitor circuits is given. Speed and voltage...

Shankar, Asit

2012-06-07T23:59:59.000Z

284

Chapter 4 Transmission Adequacy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

285

Anatomy and physiology of neurons supporting the cerebellar circuit  

E-Print Network [OSTI]

firing patterns lead to some interesting questions about the circuitand circuit connections. Do membrane and firing propertiesfiring rate. Another important area of cerebellum circuit

Champion, Kristine Elizabeth

2011-01-01T23:59:59.000Z

286

High Temperature, High Voltage Fully Integrated Gate Driver Circuit  

Broader source: Energy.gov (indexed) [DOE]

driver circuit, 5-V on- chip voltage regulator, short-circuit protection, undervoltage lockout, bootstrap capacitor, dead time controller and temperature sensor * 0.8-micron,...

287

Digital Circuits Spring 2008--Course 0156-244-001  

E-Print Network [OSTI]

: · Introduction to Logic and Binary Systems Number systems, corresponding math, & codes (BCD, grey codes, etc programmable architectures VHDL (code for converting circuit design into working programmable circuit

Bentley, Sean

288

HVDC power transmission technology assessment  

SciTech Connect (OSTI)

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

289

Hydrogen Transmission and Distribution Workshop  

Broader source: Energy.gov [DOE]

Proceedings from the Hydrogen Transmission and Distribution Workshop held February 25-26, 2014, in Golden, Colorado. The objective was to discuss and share information on the research, development, and demonstration needs and challenges for low-cost, effective hydrogen transmission and distribution from centralized production facilities to the point of use.

290

Direct current power transmission systems  

SciTech Connect (OSTI)

This book represents text on HVDC transmission available. It deals with the various aspects of the state of the art in HVDC transmission technology. This book presents many aspects of interactions of AC/DC systems. Modeling and analysis of DC systems are also discussed in detail.

Padiyar, K.R.

1991-01-01T23:59:59.000Z

291

Transmission Reliability | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

292

ITC Transmission | Open Energy Information  

Open Energy Info (EERE)

ITC Transmission ITC Transmission Jump to: navigation, search Name ITC Transmission Place Michigan Utility Id 56068 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=ITC_Transmission&oldid=410858" Categories: EIA Utility Companies and Aliases Utility

293

Kangley - Echo Lake Transmission Line Project Supplemental Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) is proposing to build a new transmission line to accommodate increasing demand for electricity and address reliability concerns in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmission line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as during a winter cold snap, could cause voltage instability and a loss of power in the King County area. System planners have projected total system load using normal growth in demand and determined that system instability could develop as early as the winter of 2002-03. Besides meeting this need for system reliability, this project would enhance the United States' delivery of power to Canada as required under the Columbia River Treaty of 1961. BPA described and analyzed transmission route alternatives in a draft environmental impact statement (DEIS) released in June 2001. The DEIS identified a preferred alternative that would parallel an existing BPA transmission line through the Cedar River Municipal Watershed. BPA received over 700 comments from landowners, agencies, tribes and special interest groups on the DEIS. Many of the comments suggested BPA re-evaluate the range of alternatives considered and prepare a supplemental draft environmental impact statement (SDEIS). After reviewing the comments and refining the cost estimates associated with BPA's preferred alternative, BPA decided to prepare this SDEIS to re-evaluate alternatives not analyzed in detail in the DEIS. The added transmission alternatives, all located outside of the Cedar River Watershed, were initially considered but dropped from detailed analysis. They are identified as Alternatives A, B, C, and D. Alternatives A and C are located to the west of the Cedar River Watershed boundary. Alternatives B and D cross the Mt. Baker-Snoqualmie and Okanogan-Wenatchee National Forests. Under all transmission alternatives, Echo Lake Substation would be expanded about three acres to the east and new equipment to accommodate the new line would be installed. BPA is also considering a Non-Transmission Alternative and the No Action Alternative.

N /A

2003-01-10T23:59:59.000Z

294

Equivalent circuits and efficiencies of fuel cells  

Science Journals Connector (OSTI)

By introducing an equivalent thermal potential fixed in terms of the heat of reaction, a thermodynamic equivalent circuit is determined for a fuel cell which yields the correct current-potential curve of the cell for low current by formal application of Ohm's law. The thermodynamic power balance and the thermodynamic efficiency also are given correctly. A linear electrical equivalent circuit is constructed which represents closely the electrical performance of the cell over a wide range of current (not approaching zero). The effect of polarization processes on the electrical power and efficiency is taken into account through a single constant parameter. Introduction of the equivalent thermal potential into the circuit yields a thermodynamic equivalent circuit whose output computed by formal use of Ohm's law coincides exactly with that given by the electrical equivalent circuit. The correct electrical properties, thermodynamic power balance, and thermodynamic efficiency follow directly from the circuit. A general theorem is formulated, independently of the validity of an equivalent circuit, connecting the thermodynamic and electrical efficiencies of a fuel cell. Confirmatory experimental results based on hydrogenoxygen cells are presented, which underline the large reduction in available power brought about by polarization processes and entropy changes in a fuel cell.

J.J. Gilvarry; J.I. Slaughtert

1963-01-01T23:59:59.000Z

295

Regional Transmission Projects: Finding Solutions  

SciTech Connect (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

296

Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions  

Broader source: Energy.gov [DOE]

Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed that gap in recent...

297

Method of manufacturing Josephson junction integrated circuits  

SciTech Connect (OSTI)

Josephson junction integrated circuits of the current injection type and magnetically controlled type utilize a superconductive layer that forms both Josephson junction electrode for the Josephson junction devices on the integrated circuit as well as a ground plane for the integrated circuit. Large area Josephson junctions are utilized for effecting contact to lower superconductive layers and islands are formed in superconductive layers to provide isolation between the groudplane function and the Josephson junction electrode function as well as to effect crossovers. A superconductor-barrier-superconductor trilayer patterned by local anodization is also utilized with additional layers formed thereover. Methods of manufacturing the embodiments of the invention are disclosed.

Jillie Jr., D. W.; Smith, L. N.

1985-02-12T23:59:59.000Z

298

Energy Transmission and Infrastructure  

SciTech Connect (OSTI)

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); analyze the potential within the district to utilize farm wastes to produce biofuels; enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; identify the policy, regulatory, and financial barriers impeding development of a new energy system; and improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the Colleges yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

299

SunShot Initiative: Transmission Grid Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Grid Integration to Transmission Grid Integration to someone by E-mail Share SunShot Initiative: Transmission Grid Integration on Facebook Tweet about SunShot Initiative: Transmission Grid Integration on Twitter Bookmark SunShot Initiative: Transmission Grid Integration on Google Bookmark SunShot Initiative: Transmission Grid Integration on Delicious Rank SunShot Initiative: Transmission Grid Integration on Digg Find More places to share SunShot Initiative: Transmission Grid Integration on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards

300

Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits  

Broader source: Energy.gov [DOE]

Docket EO-05-01: Pursuant to the United States Department of Energy ("DOE") Order No. 202-05-3, issued December 20, 2005 ("DOE Potomac River Order") Pepco hereby files this revised notice of the...

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Bibliography on transmission access issues  

SciTech Connect (OSTI)

This paper presents a bibliography on issues related to transmission access in electric power systems. There are 233 citations referenced in this bibliography. This bibliography presents a collection of selected literature on issues related to transmission access. It does not contain all of the material available on this subject or the categories contained herein. Some readers may feel that citations within this bibliography should be strictly limited to transmission system issues and not include energy pricing or reliability issues. However, it was the decision of the Subcommittee of the IEEE Task Force on Transmission Access and Nonutility Generation that selected entries relating to reliability and energy pricing, most relevant to transmission access, should be included. This decision was made because certain issues relating to reliability, transmission and energy pricing are perceived by the industry to be critical in the discussion of transmission access. The bibliography has been divided into the following sections or sub-sections: 2.0 Operational (Engineering) Issues, 3.0 Planning, 4.0 Reliability, 5.1 Economics: Costing, 5.2(a) Economics: Location-Differentiated Pricing, 5.2(b) Economics: Time-Differentiated Pricing, 5.3 Economics: Brokering, Bidding, and Auctioning, 6.0 Regulatory, and 7.0 General. Although the content of many publications spanned two or more of these sections, the desire to limit document length required that all publications be placed in the single most appropriate section. Publications are sorted according to author or publication resource.

Lankford, C.B. [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States)] [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States); McCalley, J.D. [Iowa State Univ., Ames, IA (United States)] [Iowa State Univ., Ames, IA (United States); Saini, N.K. [Entergy Services Corp., Metairie, LA (United States)] [Entergy Services Corp., Metairie, LA (United States)

1996-02-01T23:59:59.000Z

302

SAS Output  

U.S. Energy Information Administration (EIA) Indexed Site

A. U.S. Transmission Circuit Sustained Automatic Outage Counts and Hours A. U.S. Transmission Circuit Sustained Automatic Outage Counts and Hours by High-Voltage Size and NERC Region, 2012 Sustained Automatic Outage Counts Voltage Region Type Operating (kV) FRCC MRO NPCC RFC SERC SPP TRE WECC Contiguous U.S. AC 200-299 142 49 14 141 242 49 -- 484 1,121 AC 300-399 -- 88 107 95 46 56 80 165 637 AC 400-599 9 3 -- 22 86 -- -- 125 245 AC 600+ -- -- 6 9 -- -- -- -- 15 AC Total 151 140 127 267 374 105 80 774 2,018 DC 100-199 -- -- -- -- -- -- -- -- -- DC 200-299 -- 18 -- -- -- -- -- 5 23 DC 300-399 -- -- -- -- -- -- -- -- -- DC 400-499 -- 5 -- -- -- -- -- -- 5 DC 500-599 -- -- -- 5 -- -- -- 17 22 DC 600+ -- -- -- -- -- -- -- -- --

303

Electrical transmission line diametrical retainer  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

304

EIS-0365: Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov [DOE]

On February 27, 2001, Baja California Power, Inc. (hereafter referred to as Intergen), InterGen Aztec Energy, V.B.V., filed an application with DOE, Office of Fossil Energy, for a Presidential permit that would allow construction and connection of a double-circuit, 230-kV transmission line extending from the Imperial Valley Substation in California for a distance of about 6 mi (10 km) to a point west of Calexico at the U.S.-Mexico border.

305

Probing semiconductor quantum dot state and manipulation with superconducting transmission line resonator  

E-Print Network [OSTI]

A coupled system of a superconducting transmission line resonator with a semiconductor double quantum dot is analyzed. We simulate the phase shift of the microwave signal in the resonator, which is sensitive to the quantum dot qubit state and manipulation. The measurement quality is sufficiently high and the results demonstrate a solid-state quantum processor based on this type of circuit can be envisioned.

Zhe Guan

2013-12-08T23:59:59.000Z

306

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado. Additional information is available on Westerns project website.

307

Quantum computation beyond the circuit model  

E-Print Network [OSTI]

The quantum circuit model is the most widely used model of quantum computation. It provides both a framework for formulating quantum algorithms and an architecture for the physical construction of quantum computers. However, ...

Jordan, Stephen Paul

2008-01-01T23:59:59.000Z

308

B : Bayesian Circuit Analysis by Michel Wilson  

E-Print Network [OSTI]

://ftp.arl.army.mil/~mike/comphist. #12;B : Bayesian Circuit Analysis by Topology Author: Michel Wilson Student id: Email: michel obtained. esis Committee: Chair: Prof. Dr. Ir. A.J.C. van Gemund, Faculty EEMCS, TU Del University

Kuzmanov, Georgi

309

Yield learning model for integrated circuit package  

E-Print Network [OSTI]

, and has a major influence on product perfo rmance and reliability. Increasing the yield in package assembly influence on product perfo will reduce the effective manufacturing cost during assembly. Hence integrated circuit manufacturers try to improve...

Balasubramaniam, Gaurishankar

2012-06-07T23:59:59.000Z

310

Microelectronic Devices and Circuits - 2006 Electronic Edition  

E-Print Network [OSTI]

Combining semiconductor device physics and modeling with electronic circuit analysis and practice in a single sophomore/junior level microelectronics course, this textbook offers an integrated approach so students can truly ...

Fonstad, Clifton

2006-10-01T23:59:59.000Z

311

Parameterized modeling of multiport passive circuit blocks  

E-Print Network [OSTI]

System level design optimization has recently started drawing the attention of circuit designers. A system level optimizer would search over the entire design space, adjusting the parameters of interest, for optimal ...

Mahmood, Zohaib

2010-01-01T23:59:59.000Z

312

Carbon nanotube synthesis for integrated circuit interconnects  

E-Print Network [OSTI]

Based on their properties, carbon nanotubes (CNTs) have been identified as ideal replacements for copper interconnects in integrated circuits given their higher current density, inertness, and higher resistance to ...

Nessim, Gilbert Daniel

2009-01-01T23:59:59.000Z

313

Analysis of S-Circuit Uncertainty  

E-Print Network [OSTI]

The theory of sensori-computational circuits provides a capable framework for the description and optimization of robotic systems, including on-line optimizations. This theory, however, is inadequate in that it does not account for uncertainty in a...

Ahmed, Taahir

2011-08-08T23:59:59.000Z

314

Analysis and Design of Resilient VLSI Circuits  

E-Print Network [OSTI]

and design techniques with the goal of realizing VLSI circuits which are tolerant to radiation particle strikes and process variations. This dissertation consists of two parts. The first part proposes four analysis and two design approaches to address...

Garg, Rajesh

2010-07-14T23:59:59.000Z

315

Analog circuit for controlling acoustic transducer arrays  

DOE Patents [OSTI]

A simplified ananlog circuit is presented for controlling electromechanical transducer pairs in an acoustic telemetry system. The analog circuit of this invention comprises a single electrical resistor which replaces all of the digital components in a known digital circuit. In accordance with this invention, a first transducer in a transducer pair of array is driven in series with the resistor. The voltage drop across this resistor is then amplified and used to drive the second transducer. The voltage drop across the resistor is proportional and in phase with the current to the transducer. This current is approximately 90 degrees out of phase with the driving voltage to the transducer. This phase shift replaces the digital delay required by the digital control circuit of the prior art.

Drumheller, Douglas S. (Cedar Crest, NM)

1991-01-01T23:59:59.000Z

316

Equivalent Circuit Modeling of Hysteresis Motors  

SciTech Connect (OSTI)

We performed a literature review and found that many equivalent circuit models of hysteresis motors in use today are incorrect. The model by Miyairi and Kataoka (1965) is the correct one. We extended the model by transforming it to quadrature coordinates, amenable to circuit or digital simulation. 'Hunting' is an oscillatory phenomenon often observed in hysteresis motors. While several works have attempted to model the phenomenon with some partial success, we present a new complete model that predicts hunting from first principles.

Nitao, J J; Scharlemann, E T; Kirkendall, B A

2009-08-31T23:59:59.000Z

317

Investigation of dielectric overlay microstrip circuits  

E-Print Network [OSTI]

INVESTIGATION OF DIELECTRIC OVERLAY MICROSTRIP CIRCUITS A Thesis by JAMES LOUIS KLEIN Submitted to the Graduate College of Texas ARM University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE August 1988 Major... Subject: Electrical Engineering INVESTIGATION OF DIELECTRIC OVERLAY MICRO STRIP CIRCUITS A Thesis by JAMES LOUIS KLEIN Approved as to style and content by: Kai Chang Robert D. Nevels (Member) Krzysztof A. Michalski (Member) Mark H. Weichold...

Klein, James Louis

1988-01-01T23:59:59.000Z

318

IEEE Communications Magazine February 20022 Distributed Integrated Circuits  

E-Print Network [OSTI]

Approach to High-Frequency Design 0163-6804/02/$17.00 © 2002 IEEE ABSTRACT Distributed integrated circuits are presented as a methodology to design high-frequency commu- nication building blocks. Distributed circuits be implemented as integrated circuits. The integrated circuit design process is then divided further by defining

Hajimiri, Ali

319

Differential transimpedance amplifier circuit for correlated differential amplification  

DOE Patents [OSTI]

A differential transimpedance amplifier circuit for correlated differential amplification. The amplifier circuit increase electronic signal-to-noise ratios in charge detection circuits designed for the detection of very small quantities of electrical charge and/or very weak electromagnetic waves. A differential, integrating capacitive transimpedance amplifier integrated circuit comprising capacitor feedback loops performs time-correlated subtraction of noise.

Gresham, Christopher A. (Albuquerque, NM); Denton, M. Bonner (Tucson, AZ); Sperline, Roger P. (Tucson, AZ)

2008-07-22T23:59:59.000Z

320

Parallel algorithm strategies for circuit simulation.  

SciTech Connect (OSTI)

Circuit simulation tools (e.g., SPICE) have become invaluable in the development and design of electronic circuits. However, they have been pushed to their performance limits in addressing circuit design challenges that come from the technology drivers of smaller feature scales and higher integration. Improving the performance of circuit simulation tools through exploiting new opportunities in widely-available multi-processor architectures is a logical next step. Unfortunately, not all traditional simulation applications are inherently parallel, and quickly adapting mature application codes (even codes designed to parallel applications) to new parallel paradigms can be prohibitively difficult. In general, performance is influenced by many choices: hardware platform, runtime environment, languages and compilers used, algorithm choice and implementation, and more. In this complicated environment, the use of mini-applications small self-contained proxies for real applications is an excellent approach for rapidly exploring the parameter space of all these choices. In this report we present a multi-core performance study of Xyce, a transistor-level circuit simulation tool, and describe the future development of a mini-application for circuit simulation.

Thornquist, Heidi K.; Schiek, Richard Louis; Keiter, Eric Richard

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Coordination of Transmission Line Transfer Capabilities  

E-Print Network [OSTI]

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

322

Delayed Feedback and Chaos on the Driven Diode-Terminated Transmission Line  

E-Print Network [OSTI]

A simple model of a distributed, non-linear circuit that produces chaos at GHz frequencies is introduced and tested experimentally. The model circuit is a driven diode-terminated transmission line with the transmission line impedance mismatched to that of the source. Experiments were performed with sinusoidal driving frequencies of 10 MHz to 1.2 GHz, driving powers of -30 to +50 dBm and transmission line delay times from 3 to 20 ns. Diode reverse recovery times ranged from 4 to 100 ns. As a result of many experiments, it was found that chaotic behavior was strongly dependent on the unbiased, small-signal reactance of the system as seen by the driving source, and influenced by an applied DC voltage-bias across the diode. In the experiments that showed period-doubling and / or chaos, the reverse recovery times of the diodes were on the order of both the driving period and the delay time of the circuits. Comparisons between theory and experiment are in general agreement. Chaos produced with a driving frequency of 1.105 GHz has been observed experimentally.

Vassili Demergis; Alexander Glasser; Marshal Miller; Thomas M. Antonsen Jr.; Edward Ott; Steven M. Anlage

2006-05-18T23:59:59.000Z

323

PUBLISHED ONLINE: 18 SEPTEMBER 2011 | DOI: 10.1038/NPHYS2092 Strong back-action of a linear circuit on a single  

E-Print Network [OSTI]

transmission in an adjustable on-chip circuit of impedance comparable to the resistance quantum RK = h/e2 Paris Cité), Laboratoire de Photonique et de Nanostructures (LPN), route de Nozay, 91460 Marcoussis (yellow) is used to tune the studied QPC. The outer-edge channel, shown as a red line, is partially

Loss, Daniel

324

Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

325

Video transmission over wireless networks  

E-Print Network [OSTI]

Compressed video bitstream transmissions over wireless networks are addressed in this work. We first consider error control and power allocation for transmitting wireless video over CDMA networks in conjunction with multiuser detection. We map a...

Zhao, Shengjie

2005-08-29T23:59:59.000Z

326

National Electric Transmission Congestion Studies  

Broader source: Energy.gov [DOE]

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to include in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmission capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor).

327

National Transmission Grid Study: 2002  

Broader source: Energy.gov [DOE]

National Transmission Grid Study: The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity...

328

OpenEI Community - transmission  

Open Energy Info (EERE)

black out brown out bulk power system electricity grid future grid grid history security Smart Grid transmission Smart Grid Fri, 31 Oct 2014 17:58:14 +0000 Dc 955 at...

329

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap  

Broader source: Energy.gov (indexed) [DOE]

5, 2003 5, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap Tom Murphy Natural Resource Specialist - TFS/Bell-1 Proposed Action: Vegetation Management for the East Ellensburg Tap, 1/6 to 3/19 Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line with no easement width. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Kittatas County, WA being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear unwanted vegetation in the rights-of-ways and around transmission line structures that may impede the operation and maintenance of the

330

(DOE/EIS-0285-SA-100): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 8/15/02  

Broader source: Energy.gov (indexed) [DOE]

5, 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-100) Joe Johnson Natural Resource Specialist TFS/Kalispell Proposed Action: Vegetation Management along the Libby-Conkelly, 1/2 to 26/4 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 125 feet to 250 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Lincoln and Flathead County, MT, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in

331

Negative differential transmission in graphene  

Science Journals Connector (OSTI)

By using the Kubo linear response theory with the Keldysh Green function approach, we investigate the mechanism leading to the negative differential transmission in a system with the equilibrium electron density much smaller than the photon-excited one. It is shown that the negative differential transmission can appear at low probe-photon energy (in the order of the scattering rate) or at high energy (much larger than the scattering rate). For the low probe-photon energy case, the negative differential transmission is found to come from the increase of the intraband conductivity due to the large variation of electron distribution after the pumping. As for the high probe-photon energy case, the negative differential transmission is shown to tend to appear with the hot-electron temperature being closer to the equilibrium one and the chemical potential higher than the equilibrium one but considerably smaller than half of the probe-photon energy. We also show that this negative differential transmission can come from both the inter- and the intraband components of the conductivity. Especially, for the interband component, its contribution to the negative differential transmission is shown to come from both the Hartree-Fock self-energy and the scattering. Furthermore, the influence of the Coulomb-hole self-energy is also addressed.

B. Y. Sun and M. W. Wu

2013-12-17T23:59:59.000Z

332

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION | Department...  

Broader source: Energy.gov (indexed) [DOE]

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION A Public Meeting on the Quadrennial Energy Review, Hosted by the United...

333

Briefing Memo: Petroleum Product Transmission & Distribution...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Briefing Memo: Petroleum Product Transmission & Distribution Briefing Memo: Petroleum Product Transmission & Distribution Click below to download a PDF of the briefing memo....

334

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2013 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

335

Agenda: Natural Gas: Transmission, Storage and Distribution ...  

Broader source: Energy.gov (indexed) [DOE]

Natural Gas: Transmission, Storage and Distribution Agenda: Natural Gas: Transmission, Storage and Distribution A Public Meeting on the Quadrennial Energy Review, Hosted by the...

336

2006 National Electric Transmission Congestion Study Federal...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

337

National Electric Transmission Congestion Study | Department...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Study National Electric Transmission Congestion Study National Electric Transmission Congestion Study Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C....

338

2009 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

339

Electric Transmission Siting | Open Energy Information  

Open Energy Info (EERE)

navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Electric Transmission SitingLegal Abstract Electric Transmission Siting at the California...

340

2006 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

National Electric Transmission Congestion Study Workshops | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study Workshops National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops to receive input...

342

WINDExchange Offshore Wind Webinar: Transmission Planning and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind WINDExchange Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind...

343

Agenda: Electricity Transmission and Distribution - East | Department...  

Broader source: Energy.gov (indexed) [DOE]

Electricity Transmission and Distribution - East Agenda: Electricity Transmission and Distribution - East A Public Meeting on the Quadrennial Energy Review, Hosted by the United...

344

Agenda: Electricity Transmission, Storage and Distribution -...  

Broader source: Energy.gov (indexed) [DOE]

Electricity Transmission, Storage and Distribution - West Agenda: Electricity Transmission, Storage and Distribution - West A Public Meeting on the Quadrennial Energy Review,...

345

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Impact Statement for the Southline Transmission Line Project General NEPA Document Info Energy Sector Transmission Environmental Analysis Type EIS Applicant Southline...

346

Directly correlated transmission electron microscopy and atom...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directly correlated transmission electron microscopy and atom probe tomography of grain boundary oxidation in a Ni-Al binary Directly correlated transmission electron microscopy...

347

Coupled spin-boson systems and non-Markovianity in circuit-QED  

E-Print Network [OSTI]

We consider a circuit-QED setup that allows for controllable couplings between bosonic modes that locally interact with noisy qubits. In this setup, two initially independent superconducting circuits, each formed by one charge qubit and one transmission-line resonator, are put in interaction by coupling the latter to a current-biased Josephson junction, working as a coupler. We solve this problem exactly and we proceed with a thorough investigation of the emergent non-Markovianity in the dynamics of the qubits, which are also subjected to Markovian dephasing. We show that this analysis might serve the context for a first experimental assessment of non-Markovianity in a multi-element solid-state device.

P. C. Crdenas; M. Paternostro; F. L. Semio

2014-06-18T23:59:59.000Z

348

Design of Optical Interconnect Transceiver Circuits and Network-on-chip Architectures for Inter- and Intra-chip Communication  

E-Print Network [OSTI]

to compensate the optical signal loss in the transmission. At receiver side, a photodiode first converts the optical signal to electrical current. Then an optical receiver front-end circuits, transimpedance amplifier (TIA), converts and amplifiers the current... provides passive negative-feedback gain that enhances the effective transconductance of the TIAs input common-base transistor; reducing the input resistance and isolating the parasitic photodiode capacitance. This al- lows for considerable bandwidth...

Li, Cheng

2013-12-04T23:59:59.000Z

349

Lazzaro and Mead --Circuit Models of Sensory Transduction in the Cochlea CIRCUIT MODELS OF SENSORY TRANSDUCTION  

E-Print Network [OSTI]

Lazzaro and Mead -- Circuit Models of Sensory Transduction in the Cochlea CIRCUIT MODELS OF SENSORY nerve. Humans can process sound input over a 120-dB dynamic range, yet the firing rate of an auditory of the order of ten microseconds, yet an auditory-nerve fiber can fire at most once per mil- lisecond. Using

Lazzaro, John

350

Lockout device for high voltage circuit breaker  

SciTech Connect (OSTI)

An improved lockout assembly is provided for a circuit breaker to lock the switch handle into a selected switch position. The lockout assembly includes two main elements, each having a respective foot for engaging a portion of the upper housing wall of the circuit breaker. The first foot is inserted into a groove in the upper housing wall, and the second foot is inserted into an adjacent aperture (e.g., a slot) in the upper housing wall. The first foot is slid under and into engagement with a first portion, and the second foot is slid under and into engagement with a second portion of the upper housing wall. At the same time the respective two feet are placed in engagement with the respective portions of the upper housing wall, two holes, one on each of the respective two main elements of the assembly, are placed in registration; and a locking device, such as a special scissors equipped with a padlock, is installed through the registered holes to secure the lockout assembly on the circuit breaker. When the lockout assembly of the invention is secured on the circuit breaker, the switch handle of the circuit breaker is locked into the selected switch position and prevented from being switched to another switch position.

Kozlowski, L.J.; Shirey, L.A.

1993-01-26T23:59:59.000Z

351

Lockout device for high voltage circuit breaker  

DOE Patents [OSTI]

An improved lockout assembly is provided for a circuit breaker to lock the switch handle into a selected switch position. The lockout assembly includes two main elements, each having a respective foot for engaging a portion of the upper housing wall of the circuit breaker. The first foot is inserted into a groove in the upper housing wall, and the second foot is inserted into an adjacent aperture (e.g., a slot) in the upper housing wall. The first foot is slid under and into engagement with a first portion, and the second foot is slid under and into engagement with a second portion of the upper housing wall. At the same time the repsective two feet are placed in engagement with the respective portions of the upper housing wall, two holes, one on each of the respective two main elements of the assembly, are placed in registration; and a locking device, such as a special scissors equipped with a padlock, is installed through the registered holes to secure the lockout assembly on the circuit breaker. When the lockout assembly of the invention is secured on the circuit breaker, the switch handle of the circuit breaker is locked into the selected switch position and prevented from being switched to another switch position.

Kozlowski, Lawrence J. (New Kensington, PA); Shirey, Lawrence A. (North Huntingdon, PA)

1993-01-01T23:59:59.000Z

352

Lookout device for high voltage circuit breaker  

SciTech Connect (OSTI)

An improved lockout assembly is provided for a circuit breaker to lock the switch handle into a selected switch position. The lockout assembly includes two main elements, each having a respective foot for engaging a portion of the upper housing wall of the circuit breaker. The first foot is inserted into a groove in the upper housing wall, and the second foot is inserted into an adjacent aperture (e.g., a slot) in the upper housing wall. The first foot is slid under and into engagement with a first portion, and the second foot is slid under and into engagement with a second portion of the upper housing wall. At the same time the respective two feet are placed in engagement with the respective portions of the upper housing wall, two holes, one on each of the respective two main elements of the assembly, are placed in registration; and a locking device, such as a special scissors equipped with a padlock, is installed through the registered holes to secure the lockout assembly on the circuit breaker. When the lockout assembly of the invention is secured on the circuit breaker, the switch handle of the circuit breaker is locked into the selected switch position and prevented from being switched to another switch position.

Kozlowski, L.J.; Shirey, L.A.

1991-12-31T23:59:59.000Z

353

Dual circuit embossed sheet heat transfer panel  

DOE Patents [OSTI]

A heat transfer panel provides redundant cooling for fusion reactors or the like environment requiring low-mass construction. Redundant cooling is provided by two independent cooling circuits, each circuit consisting of a series of channels joined to inlet and outlet headers. The panel comprises a welded joinder of two full-size and two much smaller partial-size sheets. The first full-size sheet is embossed to form first portions of channels for the first and second circuits, as well as a header for the first circuit. The second full-sized sheet is then laid over and welded to the first full-size sheet. The first and second partial-size sheets are then overlaid on separate portions of the second full-sized sheet, and are welded thereto. The first and second partial-sized sheets are embossed to form inlet and outlet headers, which communicate with channels of the second circuit through apertures formed in the second full-sized sheet. 6 figs.

Morgan, G.D.

1984-02-21T23:59:59.000Z

354

Microsoft Word - CX-CircuitBreakerReplacementsMultipleSubstationsFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

12, 2012 12, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Michael Gilchrist Project Manager - TEP-TPP-1 Proposed Action: Power Circuit Breaker Replacement Project Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.6, Additions and modifications to transmission facilities. Location: Tumwater, Thurston County, WA; Ravensdale, King County, WA; Silver Creek, Lewis County, WA; Shelton, Mason County, WA; Bremerton, Kitsap County, WA; Bandon, Coos County, OR; Toledo, Lincoln County, OR; Wilsonville, Washington County, OR; Gold Beach, Curry County, OR; Stayton, Marion County, OR; Swan Valley, Bonneville County, ID; Moose, Teton County, WY (ID); Gold Creek, Powell County, MT.

355

Triple effect absorption chiller utilizing two refrigeration circuits  

SciTech Connect (OSTI)

This patent describes a heat absorption method for an absorption chiller. It comprises: providing a firs absorption system circuit for operation within a first temperature range, providing a second absorption system circuit for operation within a second temperature range; heat exchanging refrigerant and absorber solution; thermal communication with an external heat load. This patent describes a heat absorption apparatus for use as an absorption chiller. It includes: a first absorption system circuit for operation within a first temperature range; a second absorption system circuit for operation within a second temperature range which has a lower maximum temperature relative to the first temperature range; the first circuit having generator means, condenser means, evaporator means, and absorber means operatively connected together; the second circuit having generator means condenser means, evaporator means, and absorber means operative connected together; and the first circuit condenser means and the first circuit absorber means being in heat exchange communication with the second circuit generator means.

DeVault, R.C.

1988-03-22T23:59:59.000Z

356

Career Map: Power Systems/Transmission Engineer  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Power Systems and Transmission Engineer positions.

357

DOE Transmission System Integration Workshop  

Broader source: Energy.gov (indexed) [DOE]

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

358

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

359

Package for integrated optic circuit and method  

DOE Patents [OSTI]

A structure and method for packaging an integrated optic circuit. The package comprises a first wall having a plurality of microlenses formed therein to establish channels of optical communication with an integrated optic circuit within the package. A first registration pattern is provided on an inside surface of one of the walls of the package for alignment and attachment of the integrated optic circuit. The package in one embodiment may further comprise a fiber holder for aligning and attaching a plurality of optical fibers to the package and extending the channels of optical communication to the fibers outside the package. In another embodiment, a fiber holder may be used to hold the fibers and align the fibers to the package. The fiber holder may be detachably connected to the package.

Kravitz, Stanley H. (26 Aspen Rd., Placitas, NM 87043); Hadley, G. Ronald (6012 Annapolis NE., Albuquerque, NM 87111); Warren, Mial E. (3825 Mary Ellen NE., Albuquerque, NM 87111); Carson, Richard F. (1036 Jewel Pl. NE., Albuquerque, NM 87123); Armendariz, Marcelino G. (1023 Oro Real NE., Albuquerque, NM 87123)

1998-01-01T23:59:59.000Z

360

Circuits in the Sun: Solar Panel Physics  

Science Journals Connector (OSTI)

Typical commercial solar panels consist of approximately 60 individual photovoltaic cells connected in series. Since the usual Kirchhoff rules apply the current is uniform throughout the circuit while the electric potential of the individual devices is cumulative. Hence a solar panel is a good analog of a simple resistive series circuit except that the devices generate (rather than burn!) electrical power. For example in order to sustain the current flow each device must generate the requisite current. As a result the least efficient device limits the current throughout. Photovoltaic cells also have a more complicated current-voltage (IV) characteristic which determines the optimal load for power extraction. These considerations among others make the solar panel an excellent platform for exploring the physics of electric circuits.

Tim Gfroerer

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Package for integrated optic circuit and method  

DOE Patents [OSTI]

A structure and method are disclosed for packaging an integrated optic circuit. The package comprises a first wall having a plurality of microlenses formed therein to establish channels of optical communication with an integrated optic circuit within the package. A first registration pattern is provided on an inside surface of one of the walls of the package for alignment and attachment of the integrated optic circuit. The package in one embodiment may further comprise a fiber holder for aligning and attaching a plurality of optical fibers to the package and extending the channels of optical communication to the fibers outside the package. In another embodiment, a fiber holder may be used to hold the fibers and align the fibers to the package. The fiber holder may be detachably connected to the package. 6 figs.

Kravitz, S.H.; Hadley, G.R.; Warren, M.E.; Carson, R.F.; Armendariz, M.G.

1998-08-04T23:59:59.000Z

362

Stand-off transmission lines and method for making same  

DOE Patents [OSTI]

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress. 16 figures.

Tuckerman, D.B.

1991-05-21T23:59:59.000Z

363

Stand-off transmission lines and method for making same  

DOE Patents [OSTI]

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress.

Tuckerman, David B. (Livermore, CA)

1991-01-01T23:59:59.000Z

364

Summary of multiterminal high-voltage direct current transmission technology  

SciTech Connect (OSTI)

This report summarizes the present state of multiterminal (MT) high-voltage direct current (HVDC) power transmission. The purpose is to reassess the need for HVDC circuit breakers and to identify needed research for MT HVDC. The fundamentals of this technology are presented, and previous research and development is reviewed. Although no MT HVDC systems have yet been built, many concepts have been proposed. Some require a dc breaker, and others do not. Both options have advantages and disadvantages for various applications, so the selection will depend on the proposed application. Research is needed to define operating characteristics of various MT HVDC systems. In some applications, dc breakers will be useful, so research into HVDC interruption should continue. Also, dc fault detection and control algorithms for MT systems should be studied.

Biggs, R.B.; Jewell, W.T.

1984-05-01T23:59:59.000Z

365

Triple effect absorption chiller utilizing two refrigeration circuits  

SciTech Connect (OSTI)

A heat absorption method for an absorption chiller is described comprising: (a) providing a first absorption system circuit for operation within a first temperature range; (b) providing a second absorption system circuit for operation within a second temperature range which has a lower maximum temperature than the first temperature range; (c) heat exchanging refrigerant and absorber solution from the first circuit condenser and absorber with absorption solution from the generator of the second circuit; and (d) the evaporator of the first circuit and the evaporator of the second circuit both being disposed in thermal communication with an external heat load to withdraw heat from the heat load.

De Vault, R.C.

1988-03-22T23:59:59.000Z

366

Hybrid high direct current circuit interrupter  

DOE Patents [OSTI]

A device and a method are disclosed for interrupting very high direct currents (greater than 100,000 amperes) and simultaneously blocking high voltages (greater than 600 volts). The device utilizes a mechanical switch to carry very high currents continuously with low loss and a silicon controlled rectifier (SCR) to bypass the current around the mechanical switch while its contacts are separating. A commutation circuit, connected in parallel with the SCR, turns off the SCR by utilizing a resonant circuit to divert the SCR current after the switch opens. 7 figs.

Rockot, J.H.; Mikesell, H.E.; Jha, K.N.

1998-08-11T23:59:59.000Z

367

Hybrid high direct current circuit interrupter  

DOE Patents [OSTI]

A device and a method for interrupting very high direct currents (greater than 100,000 amperes) and simultaneously blocking high voltages (greater than 600 volts). The device utilizes a mechanical switch to carry very high currents continuously with low loss and a silicon controlled rectifier (SCR) to bypass the current around the mechanical switch while its contacts are separating. A commutation circuit, connected in parallel with the SCR, turns off the SCR by utilizing a resonant circuit to divert the SCR current after the switch opens.

Rockot, Joseph H. (N. Huntingdon, PA); Mikesell, Harvey E. (McMurray, PA); Jha, Kamal N. (Bethel Park, PA)

1998-01-01T23:59:59.000Z

368

Quantum Electric Circuits Analogous to Ballistic Conductors  

E-Print Network [OSTI]

The conductance steps in a constricted two-dimensional electron gas and the minimum conductivity in graphene are related to a new uncertainty relation between electric charge and conductance in a quantized electric circuit that mimics the electric transport in mesoscopic systems. This uncertainty relation makes specific use of the discreteness of electric charge. Quantum electric circuits analogous to both constricted two-dimensional electron gas and graphene are introduced. In the latter case a new insight into the origin of minimum conductivity is obtained.

Daniela Dragoman

2007-11-28T23:59:59.000Z

369

Kirchhoff voltage law corrected for radiating circuits  

E-Print Network [OSTI]

When a circular loop composed by a RLC is put to oscillate, the oscillation will eventually vanish in an exponentially decaying current, even considering superconducting wires, due to the emission of electric and magnetic dipole radiation. In this work we propose a modification on the Kirchhoff voltage law by adding the radiative contributions to the energy loss as an effective resistance, whose value is relatively small when compared to typical resistance value, but fundamental to describe correctly real circuits. We have also analysed the change in the pattern of the radiation spectra emitted by the circuit as we vary both the effective and electrical resistance.

Lara, Vitor

2014-01-01T23:59:59.000Z

370

Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

N /A

2003-06-20T23:59:59.000Z

371

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

transmission right, electricity auction, simultaneous feasibility, transmission pricing. I. INTRODUCTION POINT

372

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

, transmission pricing. I. INTRODUCTION POINT-TO-POINT financial transmission rights (FTRs) (see [2] and [7

373

Power superconducting power transmission cable  

DOE Patents [OSTI]

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

374

Power Transmission, Distribution and Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Transmission, Distribution and Plants A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Abdel-Aal, Radwan E. - Computer Engineering Department, King Fahd University of...

375

Quantum effects in nanoscale Josephson junction circuits  

E-Print Network [OSTI]

Quantum effects in nanoscale Josephson junction circuits SILVIA CORLEVI Doctoral Thesis Stockholm Josephson junction arrays with SQUID geometry. TRITA FYS 2006:31 ISSN 0280-316X ISRN KTH/FYS/­06:31­SE ISBN study on single-charge effects in nanoscale Josephson junctions and Cooper pair transistors (CPTs

Haviland, David

376

Simulating weak localization using superconducting quantum circuits  

E-Print Network [OSTI]

Understanding complex quantum matter presents a central challenge in condensed matter physics. The difficulty lies in the exponential scaling of the Hilbert space with the system size, making solutions intractable for both analytical and conventional numerical methods. As originally envisioned by Richard Feynman, this class of problems can be tackled using controllable quantum simulators. Despite many efforts, building an quantum emulator capable of solving generic quantum problems remains an outstanding challenge, as this involves controlling a large number of quantum elements. Here, employing a multi-element superconducting quantum circuit and manipulating a single microwave photon, we demonstrate that we can simulate the weak localization phenomenon observed in mesoscopic systems. By engineering the control sequence in our emulator circuit, we are also able to reproduce the well-known temperature dependence of weak localization. Furthermore, we can use our circuit to continuously tune the level of disorder, a parameter that is not readily accessible in mesoscopic systems. By demonstrating a high level of control and complexity, our experiment shows the potential for superconducting quantum circuits to realize scalable quantum simulators.

Yu Chen; P. Roushan; D. Sank; C. Neill; Erik Lucero; Matteo Mariantoni; R. Barends; B. Chiaro; J. Kelly; A. Megrant; J. Y. Mutus; P. J. J. O'Malley; A. Vainsencher; J. Wenner; T. C. White; Yi Yin; A. N. Cleland; John M. Martinis

2014-03-26T23:59:59.000Z

377

Automatic Stability Checking for Large Analog Circuits  

E-Print Network [OSTI]

breakpoints. However, this method suffers from extremely high time and memory complexity and thus cannot be scaled to very large analog circuits. In this research work, we first take an in-depth look at the loop finder algorithm so as to identify certain key...

Mukherjee, Parijat 1985-

2010-12-06T23:59:59.000Z

378

Computing with neural circuits: a model  

Science Journals Connector (OSTI)

...decision networks that used a system offeed-forward synap-tic connectivity and a simple...perceptron-like networks, which emphasized feed-forward connectivity. Graded-response neurons...A-B converter and TSP circuit, were-"forward-engineered." Given the optimization...

JJ Hopfield; DW Tank

1986-08-08T23:59:59.000Z

379

MODELING AND VISUALIZATION OF SYNTHETIC GENETIC CIRCUITS  

E-Print Network [OSTI]

. INTRODUCTION In 1977 a group of researchers managed to modify the DNA of the E. coli bacteria and were able to make it to produce the human hormone somatostatin [1]. Since that time genetic engineers have leveraged on Visualization of Genetic Circuits will give an overview on the use and effectiveness of the new visualization

Myers, Chris J.

380

Disentangling Mental Disorders : from Genes to Circuits  

E-Print Network [OSTI]

Summer Program 2014 Disentangling Mental Disorders : from Genes to Circuits RIKEN Brain Science Application : http://www.brain.riken.jp/en/summer/ Inquiries : info.summer@brain.riken.jp RIKEN Brain Science July 15-July 22, 2014 Summer Program 2014 Summer Program 2014 RIKEN Brain Science InstituteRIKEN Brain

Kazama, Hokto

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

CONCEPTS FOR TEACHING OPTOELECTRONIC CIRCUITS AND SYSTEMS  

E-Print Network [OSTI]

CONCEPTS FOR TEACHING OPTOELECTRONIC CIRCUITS AND SYSTEMS Smail TEDJINI, Benoit PANNETIER, Laurent.Lastname@esisar.inpg.fr Keywords : Optoelectronic devices, optical signals, communication systems, modeling, simulation, CAD and design of optical communication and optoelectronic systems is now necessary for the engineers

Boyer, Edmond

382

Three-dimensional Integrated Circuit Design  

Science Journals Connector (OSTI)

With vastly increased complexity and functionality in the "nanometer era" (i.e. hundreds of millions of transistors on one chip), increasing the performance of integrated circuits has become a challenging task. This is due primarily to the inevitable ... Keywords: Computer Architecture, Computer Engineering, Computer Science

Vasilis F. Pavlidis; Eby G. Friedman

2008-09-01T23:59:59.000Z

383

Quantum computer of wire circuit architecture  

E-Print Network [OSTI]

First solid state quantum computer was built using transmons (cooper pair boxes). The operation of the computer is limited because of using a number of the rigit cooper boxes working with fixed frequency at temperatures of superconducting material. Here, we propose a novel architecture of quantum computer based on a flexible wire circuit of many coupled quantum nodes containing controlled atomic (molecular) ensembles. We demonstrate wide opportunities of the proposed computer. Firstly, we reveal a perfect storage of external photon qubits to multi-mode quantum memory node and demonstrate a reversible exchange of the qubits between any arbitrary nodes. We found optimal parameters of atoms in the circuit and self quantum modes for quantum processing. The predicted perfect storage has been observed experimentally for microwave radiation on the lithium phthalocyaninate molecule ensemble. Then also, for the first time we show a realization of the efficient basic two-qubit gate with direct coupling of two arbitrary nodes by using appropriate atomic frequency shifts in the circuit nodes. Proposed two-qubit gate runs with a speed drastically accelerated proportionally to the number of atoms in the node. The direct coupling and accelerated two-qubit gate can be realized for large number of the circuit nodes. Finally, we describe two and three-dimensional scalable architectures that pave the road to construction of universal multi-qubit quantum computer operating at room temperatures.

S. A. Moiseev; F. F. Gubaidullin; S. N. Andrianov

2010-01-07T23:59:59.000Z

384

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

385

Parallel and Distributed Multi-Algorithm Circuit Simulation  

E-Print Network [OSTI]

With the proliferation of parallel computing, parallel computer-aided design (CAD) has received significant research interests. Transient transistor-level circuit simulation plays an important role in digital/analog circuit design and verification...

Dai, Ruicheng

2012-10-19T23:59:59.000Z

386

Parallel Algorithms for Time and Frequency Domain Circuit Simulation  

E-Print Network [OSTI]

solution to circuit simulation besides the known application of distributed-memory clustered computing platforms, which provides abundant hardware computing resources. This research addresses the limitations of traditional serial circuit simulations...

Dong, Wei

2010-10-12T23:59:59.000Z

387

General equivalent circuit of batteries and fuel cells  

Science Journals Connector (OSTI)

A general electrical circuit is described whose properties are analogous to those of fuel cells and batteries. It is shown how this equivalent circuit ... in the electrolyte on the output voltage of fuel cells an...

R. A. Huggins

1999-01-01T23:59:59.000Z

388

Constraint satisfaction modules : a methodology for analog circuit design  

E-Print Network [OSTI]

This dissertation describes a methodology for solving convex constraint problems using analog circuits. It demonstrates how this methodology can be used to design circuits that solve function-fitting problems through ...

Mitros, Piotr, 1979-

2007-01-01T23:59:59.000Z

389

Micro Electret Energy Harvesting Device with Analogue Impedance Conversion Circuit  

E-Print Network [OSTI]

Micro Electret Energy Harvesting Device with Analogue Impedance Conversion Circuit Yuji Suzuki1 using a low-power-consumption impedance conversion circuit. Key words: Energy harvesting, Electret, CYTOP, Parylene spring, Impedance conversion 1. INTRODUCTION Energy harvesting from environmental

Kasagi, Nobuhide

390

Circuit and bond polytopes on series-parallel graphs$  

E-Print Network [OSTI]

Jul 10, 2014 ... In the literature, a circuit is sometimes called simple cycle. ... of the circuits of series-parallel graphs, combined with a theorem of Balas [2, 3].

2014-07-10T23:59:59.000Z

391

Trust in analog : analog circuit techniques for reducing the risk of malicious circuits and software  

E-Print Network [OSTI]

Malicious circuits and software present a significant security risk, especially in control applications. This work is concerned with increasing the trustworthiness of control circuitry by reducing its complexity. The ...

Kuznetsov, Eugene

2011-01-01T23:59:59.000Z

392

Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or conductors, and two neutral ground wires that would provide both lightning protection and fiber optic communications, on a single set of support structures. The transmission line would originate at TEP's existing South Substation (which TEP would expand), in the vicinity of Sahuarita, Arizona, and interconnect with the Citizens Communications (Citizens) system at a Gateway Substation that TEP would construct west of Nogales, Arizona. The double-circuit transmission line would continue from the Gateway Substation south to cross the U.S.-Mexico border and extend approximately 60 miles (mi) (98 kilometers [km]) into the Sonoran region of Mexico, connecting with the Comision Federal de Electricidad (CFE, the national electric utility of Mexico) at CFE's Santa Ana Substation.

N /A

2003-08-27T23:59:59.000Z

393

(DOE/EIS-0285/SA-120): Supplement Analysis for the Transmission System Vegetation Management Program FEISq 2/10/03  

Broader source: Energy.gov (indexed) [DOE]

0, 2003 0, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-120 Hanford-Ostrander Corridor Maintenance William Erickson TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management for the Hanford-Ostrander Transmission Line Corridor from Tower 10/4 to Tower 17/2 + 770. The line is a 500kV Single Circuit Transmission Line having an easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as referenced on the attached checklist. Location: The subject right-of-way is located in Benton County, WA. In the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

394

(DOE/EIS-0285/SA=32): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (11/15/01)  

Broader source: Energy.gov (indexed) [DOE]

November 15, 2001 November 15, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-32) Bill Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Re-vegetation Plot Study along the Lower Monumental-McNary Transmission Line ROW. The study area sections are located near structures 38/4 and 39/3. The line is a 500kV Single Circuit Transmission Line having an easement width of 165 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as indicated on the attached checklist. Location: The ROW is located in Walla Walla County, WA being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

395

(DOE/EIS-0285/SA-57): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/10/02  

Broader source: Energy.gov (indexed) [DOE]

0, 2002 0, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57) Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Trojan-Allston Transmission Lines 1 & 2 ROW between 1/1 and 9/1. The lines are 230 kV Single Circuit Transmission Lines having an easement width of 125 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

396

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20)(8/2/01)  

Broader source: Energy.gov (indexed) [DOE]

2, 2001 2, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20) Bill Erickson - TFP/Walla Walla - Natural Resource Specialist Jim Jellison - TFO/Olympia - Natural Resource Specialist Proposed Action: Vegetation Management along the McNary-Ross 161/1 to 166/5+346 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 175 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Clark County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

397

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-33)(11/27/01)  

Broader source: Energy.gov (indexed) [DOE]

November 27, 2001 November 27, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS- 0285/SA-33) Bill Erickson - TFP/Walla Walla Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the St Helens-Allston Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line having an easement width of 100 feet. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear danger trees from varying widths of the indicated transmission line right-of-way that are approaching electrical clearance zones in accordance

398

(DOE/EIS-0285/SA-11): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Broader source: Energy.gov (indexed) [DOE]

1) 1) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Covington-Maple Valley No. 2 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 150 feet. The proposed work will be accomplished in selected sections along the entire transmission line corridor. Location: The ROW is located in King County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with

399

The Wave Band' Theory of Wireless Transmission  

Science Journals Connector (OSTI)

... the tuned circuit, namely, that the really selective circuit does cut off the higher audio frequencies, generally explained by the cutting of the side bands What is actually ... its excitation has ceased. If it is excited by a carrier modulated by a high audio frequency, the persistence of its vibrations will not allow the amplitude of these to ...

A. A. NEWBOLD

1930-03-01T23:59:59.000Z

400

A Spatial Computing Architecture for Implementing Computational Circuits  

E-Print Network [OSTI]

A Spatial Computing Architecture for Implementing Computational Circuits David Grant and Guy G. F an architecture and tool flow for rapidly compiling and simulating/executing computational circuits. We use tool could quickly map a computational circuit onto the architecture. Field Programmable Gate Arrays

Lemieux, Guy

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Logic Synthesis with High Speed CMOS Circuit Techniques  

Science Journals Connector (OSTI)

Systems for automated logic synthesis with the True Single Phase Clocking circuit technique (TSPC) and a modified form of the Clock and Data Precharged Dynamic (CDPD) circuit technique, are presented. The CDPD system synthesizes high speed one clock ... Keywords: CMOS integrated circuits, logic synthesis

Johnny Pihl; Einar J. Aas

1997-01-01T23:59:59.000Z

402

Different Factors Affecting Short Circuit Behavior of a Wind Power Plant  

SciTech Connect (OSTI)

A wind power plant consists of a large number of turbines interconnected by underground cable. A pad-mount transformer at each turbine steps up the voltage from generating voltage (690 V) to a medium voltage (34.5 kV). All turbines in the plant are connected to the substation transformer where the voltage is stepped up to the transmission level. An important aspect of wind power plant (WPP) impact studies is to evaluate the short-circuit (SC) current contribution of the plant into the transmission network under different fault conditions. This task can be challenging to protection engineers due to the topology differences between different types of wind turbine generators (WTGs) and the conventional generating units. This paper investigates the short circuit behavior of a wind power plant for different types of faults. The impact of wind turbine types, the transformer configuration, and the reactive compensation capacitor will be investigated. The voltage response at different buses will be observed. Finally, the SC line currents will be presented along with its symmetrical components.

Muljadi, E.; Samaan, Nader A.; Gevorgian, Vahan; Li, Jun; Pasupulati, Subbaiah

2010-12-21T23:59:59.000Z

403

Different Factors Affecting Short Circuit Behavior of a Wind Power Plant  

SciTech Connect (OSTI)

A wind power plant consists of a large number of turbines interconnected by underground cable. A pad-mount transformer at each turbine steps up the voltage from generating voltage (690 V) to a medium voltage (34.5 kV). All turbines in the plant are connected to the substation transformer where the voltage is stepped up to the transmission level. An important aspect of wind power plant (WPP) impact studies is to evaluate the short-circuit (SC) current contribution of the plant into the transmission network under different fault conditions. This task can be challenging to protection engineers due to the topology differences between different types of wind turbine generators (WTGs) and the conventional generating units. This paper investigates the short circuit behavior of a wind power plant for different types of faults. The impact of wind turbine types, the transformer configuration, and the reactive compensation capacitor will be investigated. The voltage response at different buses will be observed. Finally, the SC line currents will be presented along with its symmetrical components.

Muljadi, E.; Samaan, Nader A.; Gevorgian, Vahan; Li, Jun; Pasupulati, Subbaiah

2013-01-31T23:59:59.000Z

404

NREL: Transmission Grid Integration - Webinars  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

405

DOE Electricity Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

406

transmission | OpenEI Community  

Open Energy Info (EERE)

21 21 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235321 Varnish cache server transmission Home Kyoung's picture Submitted by Kyoung(155) Contributor 12 November, 2012 - 09:17 Legal Reviews are Underway BHFS Legal review permitting power plant roadmap transmission The legal review of the Regulatory Roadmap flowcharts and supporting content is well underway and will continue for the next several months with our legal team at [www.bhfs.com Brownstein Hyatt Farber and Schreck]. The

407

Recovery Act Interconnection Transmission Planning  

Broader source: Energy.gov [DOE]

Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

408

Coiled transmission line pulse generators  

DOE Patents [OSTI]

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

409

IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS, VOL. CAS-32,NO. 7, JULY 1985 Circuits, k-Ports, Hidden Modes, and  

E-Print Network [OSTI]

IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS, VOL. CAS-32,NO. 7, JULY 1985 Circuits, k-Ports, Hidden Modes, and Stability of Interconnected k-Ports 635 CHARLES A. DESOER, FELLOW, IEEE, AND A. NAZLI GijNDES Alisrrocr -This paper exclusively considers lumped k-ports and circuits which contain linear time

Gundes, A. N.

410

Definition: Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Service Service Jump to: navigation, search Dictionary.png Transmission Service Services provided to the Transmission Customer by the Transmission Service Provider to move energy from a Point of Receipt to a Point of Delivery.[1] Related Terms transmission lines, Transmission Customer, Transmission Service Provider, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Service&oldid=480302" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

411

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

412

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission...

413

Ebola virus transmission in guinea pigs  

Science Journals Connector (OSTI)

...Rights Reserved. 2014 research-article Ebola virus transmission in guinea pigs Gary...School of Medicine, Philadelphia, PA, USA Ebola virus (EBOV) transmission is currently...movement over short distances. Importance Ebola is generally thought to be spread between...

Gary Wong; Xiangguo Qiu; Jason S. Richardson; Todd Cutts; Brad Collignon; Jason Gren; Jenna Aviles; Carissa Embury-Hyatt; Gary P. Kobinger

2014-11-12T23:59:59.000Z

414

MagLab - Transmission Lines Tutorial  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tweet Education Home > MagLab U > Interactive Tutorials Arrow Transmission Lines More than half a million miles of high-voltage transmission lines criss-cross the United States. If...

415

Transmission Issues and Power Exchanges in Texas  

E-Print Network [OSTI]

on the transmission owning utilities by several parties, primary distribution cooperatives, cogenerators, and large industrial customers, to grant wider access to the system. This pressure is coming at a time when transmission lines are becoming increasingly difficult...

Hughes, H. L.

416

Vibration Transmission through Symmetric Resonant Couplings  

Science Journals Connector (OSTI)

15 March 1994 research-article Vibration Transmission through Symmetric Resonant Couplings D. J. Allwright...Blakemore P. R. Brazier-Smith J. Woodhouse The transmission of vibration through a symmetric junction is considered. The problem is...

1994-01-01T23:59:59.000Z

417

EEI/DOE Transmission Capacity Report  

Broader source: Energy.gov (indexed) [DOE]

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

418

Mountain States Transmission Intertie (MSTI) Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

419

Sandia National Laboratories: Transmission Grid Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure Security, Modeling, Modeling & Analysis, News, News & Events, Renewable Energy, SMART Grid, Systems Analysis, Transmission Grid Integration, Wind Energy Sandia...

420

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Integrated Transmission and Distribution Control  

SciTech Connect (OSTI)

Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: Develop a simulation environment for integrating transmission and distribution control, Construct reduced-order controllable models for smart grid assets at the distribution level, Design and validate closed-loop control strategies for distributed smart grid assets, and Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

2013-01-16T23:59:59.000Z

422

BPA, Electric Transmission Overview, October 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Electric Transmission Overview Electric transmission Electric transmission is the process by which large amounts of...

423

The real problem with Merchant transmission  

SciTech Connect (OSTI)

Current regulatory policy distinguishes transmission investments that have primarily economic benefits from those that primarily enhance reliability. But no such dichotomy exists; congestion and reliability are inter-related in complex ways. Thus, solving the transmission investment problem is more complex than ''fixing'' merchant transmission; investment in the grid must be treated as a systems problem. (author)

Blumsack, Seth; Lave, Lester B.; Ilic, Marija

2008-03-15T23:59:59.000Z

424

Spectral Theory for Nonconservative Transmission Line Networks  

E-Print Network [OSTI]

Spectral Theory for Nonconservative Transmission Line Networks Robert Carlson Department The global theory of transmission line networks with nonconserva- tive junction conditions is developed from is determined. Specialized results are developed for rational graphs. 1 #12;1 Introduction The transmission line

Carlson, Bob

425

TRIAC/SCR proportional control circuit  

DOE Patents [OSTI]

A power controller device is disclosed which uses a voltage-to-frequency converter in conjunction with a zero crossing detector to linearly and proportionally control AC power being supplied to a load. The output of the voltage-to frequency converter controls the ``reset`` input of a R-S flip flop, while an ``0`` crossing detector controls the ``set`` input. The output of the flip flop triggers a monostable multivibrator controlling the SCR or TRIAC firing circuit connected to the load. Logic gates prevent the direct triggering of the multivibrator in the rare instance where the ``reset`` and ``set`` inputs of the flip flop are in coincidence. The control circuit can be supplemented with a control loop, providing compensation for line voltage variations. 9 figs.

Hughes, W.J.

1999-04-06T23:59:59.000Z

426

TRIAC/SCR proportional control circuit  

DOE Patents [OSTI]

A power controller device which uses a voltage-to-frequency converter in conjunction with a zero crossing detector to linearly and proportionally control AC power being supplied to a load. The output of the voltage-to frequency converter controls the "reset" input of a R-S flip flop, while an "0" crossing detector controls the "set" input. The output of the flip flop triggers a monostable multivibrator controlling the SCR or TRIAC firing circuit connected to the load. Logic gates prevent the direct triggering of the multivibrator in the rare instance where the "reset" and "set" inputs of the flip flop are in coincidence. The control circuit can be supplemented with a control loop, providing compensation for line voltage variations.

Hughes, Wallace J. (Boston Lake, NY)

1999-01-01T23:59:59.000Z

427

Vacuum die attach for integrated circuits  

DOE Patents [OSTI]

A thin film eutectic bond for attaching an integrated circuit die to a circuit substrate is formed by coating at least one bonding surface on the die and substrate with an alloying metal, assembling the die and substrate under compression loading, and heating the assembly to an alloying temperature in a vacuum. A very thin bond, 10 microns or less, which is substantially void free, is produced. These bonds have high reliability, good heat and electrical conduction, and high temperature tolerance. The bonds are formed in a vacuum chamber, using a positioning and loading fixture to compression load the die, and an IR lamp or other heat source. For bonding a silicon die to a silicon substrate, a gold silicon alloy bond is used. Multiple dies can be bonded simultaneously. No scrubbing is required. 1 figure.

Schmitt, E.H.; Tuckerman, D.B.

1991-09-10T23:59:59.000Z

428

Custom VLSI circuits for high energy physics  

SciTech Connect (OSTI)

This article provides a brief guide to integrated circuits, including their design, fabrication, testing, radiation hardness, and packaging. It was requested by the Panel on Instrumentation, Innovation, and Development of the International Committee for Future Accelerators, as one of a series of articles on instrumentation for future experiments. Their original request emphasized a description of available custom circuits and a set of recommendations for future developments. That has been done, but while traps that stop charge in solid-state devices are well known, those that stop physicists trying to develop the devices are not. Several years spent dodging the former and developing the latter made clear the need for a beginner`s guide through the maze, and that is the main purpose of this text.

Parker, S. [Univ. of Hawaii, Honolulu, HI (United States)

1998-06-01T23:59:59.000Z

429

Base drive and overlap protection circuit  

DOE Patents [OSTI]

An inverter (34) which provides power to an A. C. machine (28) is controlled by a circuit (36) employing PWM control strategy whereby A. C. power is supplied to the machine at a preselectable frequency and preselectable voltage. This is accomplished by the technique of waveform notching in which the shapes of the notches are varied to determine the average energy content of the overall waveform. Through this arrangement, the operational efficiency of the A. C. machine is optimized. The control circuit includes a microcomputer and memory element which receive various parametric inputs and calculate optimized machine control data signals therefrom. The control data is asynchronously loaded into the inverter through an intermediate buffer (38). A base drive and overlap protection circuit is included to insure that both transistors of a complimentary pair are not conducting at the same time. In its preferred embodiment, the present invention is incorporated within an electric vehicle (10) employing a 144 VDC battery pack (32) and a three-phase induction motor (18).

Gritter, David J. (Southfield, MI)

1983-01-01T23:59:59.000Z

430

Fact #802: November 4, 2013 Market Share by Transmission Type...  

Energy Savers [EERE]

2: November 4, 2013 Market Share by Transmission Type Fact 802: November 4, 2013 Market Share by Transmission Type The variety of transmission technologies has increased as...

431

Western-UGP Transmission and Ancillary Services Rates Customer...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

80 Percentage of transmission plant included in UMZ Rates (line 79 line 76) TP 1.00000 TRANSMISSION EXPENSES 81 Total transmission expenses (sum lines 41 to 43,...

432

RAPID/BulkTransmission/About | Open Energy Information  

Open Energy Info (EERE)

Contribute Contact Us About Bulk Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry...

433

RAPID/Geothermal/Transmission Siting & Interconnection/Nevada...  

Open Energy Info (EERE)

Siting Agency: Public Utilities Commission of Nevada Transmission Siting Transmission lines over 200 kV are handled by the state's CPCN process. Siting of transmission lines with...

434

Colorado/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Roadmap < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

435

SunZia Southwest Transmission Project Comments  

Broader source: Energy.gov (indexed) [DOE]

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

436

California/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Roadmap < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

437

Arizona/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

438

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

439

Relativistic tunneling and accelerated transmission  

E-Print Network [OSTI]

We obtain the solutions for the tunneling zone of a one-dimensional electrostatic potential in the relativistic (Dirac to Klein-Gordon) wave equation regime when the incoming wave packet exhibits the possibility of being almost totally transmitted through the potential barrier. The conditions for the occurrence of accelerated and, eventually, superluminal tunneling transmission probabilities are all quantified and the problematic superluminal interpretation originated from the study based on non-relativistic dynamics of tunneling is overcome. The treatment of the problem suggests revealing insights into condensed-matter experiments using electrostatic barriers in single- and bi-layer graphene, for which the accelerated tunneling effect deserves a more careful investigation.

Alex E. Bernardini

2007-06-26T23:59:59.000Z

440

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Idaho/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Roadmap Idaho/Transmission/Roadmap < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

442

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Idaho, the state's siting authority is limited to siting approvals on state property, and high voltage transmission lines (115kV or greater) within a National Interstate Electric Transmission Corridor (NIETC). Under these circumstances a Route Permit would be required by the Idaho Public Utilities Commission (IPUC); however, no such corridors have been designated and therefore the process has not been tested. Local governments

443

Colorado/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Colorado/Transmission/Summary Colorado/Transmission/Summary < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution. State Siting Act None State Preemptive Authority The CPUC has backstop authority only. If a permit is denied by the local government, the applicant may appeal to the CPUC if certain conditions are met (CRS 29-20-108).

444

Open Access Transmission and Renewable Energy Technologies  

SciTech Connect (OSTI)

In April 1996, the Federal Regulatory Commission (PERC) approved Orders 888 and 889 and released a draft rule for public comment on capacity reservation tariffs (CRTs). Order No. 888 requires electric utilities to file transmission tariffs that would allow transmission access to third parties who want to conduct wholesale transactions, and Order No. 889 requires transmission-owning utilities to set up open access, same-time information systems (OASIS), using commercial software and Internet protocols. This paper discusses these Orders in detail, as well as some of the issues before FERC with implications for renewables, which include: transmission pricing; transmission terms and conditions; reassignment of transmission capacity; defining state and FERC jurisdiction over transmission and distribution; the pricing of ancillary services; and the adoption and implementation of independent system operators.

Porter, K.

1996-09-01T23:59:59.000Z

445

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

large, but conceptual, transmission lines such as the C/PNW-very conceptual transmission lines that resemble radialand voltage of transmission lines added in the study, as

Wiser, Ryan

2014-01-01T23:59:59.000Z

446

A MIXED INTEGER DISJUNCTIVE MODEL FOR TRANSMISSION ...  

E-Print Network [OSTI]

voltage meshed networks, providing good approximations for the circuit flows, and avoids ..... function is used to bias the selection of the RCL candidate variables .... 1977 he was a project manager and researcher at the telephone utility of Rio.

Laura

2001-10-26T23:59:59.000Z

447

Microwave degenerate parametric down-conversion with a single cyclic three-level system in circuit QED  

E-Print Network [OSTI]

With the assistance of a single cyclic three-level system, which can be realized by a superconducting flux qubit, we study theoretically the degenerate microwave parametric down-conversion (PDC) in a superconducting transmission line resonator with the fundamental and second harmonic modes involved. By adiabatically eliminating the excited states of the three-level system, we obtain an effective microwave PDC Hamiltonian for the two resonator modes in such a circuit QED system. The corresponding PDC efficiency in our model can be much larger than that in the similar circuit QED system based on a single two-level superconducting qubit [K. Moon and S. M. Girvin, Phys. Rev. Lett. {\\bf 95}, 140504 (2005)]. Furthermore, we consider the squeezing and bunching behavior of the fundamental mode resulting from the coherent drive to the second harmonic one.

Z. H. Wang; C. P. Sun; Yong Li

2014-08-28T23:59:59.000Z

448

Synthesis of the Optimal 4-bit Reversible Circuits  

E-Print Network [OSTI]

Optimal synthesis of reversible functions is a non-trivial problem. One of the major limiting factors in computing such circuits is the sheer number of reversible functions. Even restricting synthesis to 4-bit reversible functions results in a huge search space (16!~2^44 functions). The output of such a search alone, counting only the space required to list Toffoli gates for every function, would require over 100 terabytes of storage. In this paper, we present an algorithm that synthesizes an optimal circuit for any 4-bit reversible specification. We employ several techniques to make the problem tractable. We report results from several experiments, including synthesis of random 4-bit permutations, optimal synthesis of all 4-bit linear reversible circuits, synthesis of existing benchmark functions, and distribution of optimal circuits. Our results have important implications for the design and optimization of quantum circuits, testing circuit synthesis heuristics, and performing experiments in the area of quantum information processing.

Oleg Golubitsky; Sean M. Falconer; Dmitri Maslov

2010-03-09T23:59:59.000Z

449

SAS Output  

U.S. Energy Information Administration (EIA) Indexed Site

A. U.S. Transmission Circuit Sustained Automatic Outage Counts and Hours by Cause Code and by NERC Region, 2012 A. U.S. Transmission Circuit Sustained Automatic Outage Counts and Hours by Cause Code and by NERC Region, 2012 AC & DC Circuit Outage Counts Sustained Outage Causes FRCC MRO NPCC RFC SERC SPP TRE WECC Contiguous U.S. Weather, excluding lightning 6.00 27.00 3.00 30.00 63.00 12.00 -- 69.00 210.00 Lightning 5.00 10.00 8.00 5.00 31.00 16.00 13.00 57.00 145.00 Environmental -- 1.00 1.00 5.00 -- 1.00 -- -- 8.00 Contamination 14.00 -- -- -- 22.00 3.00 6.00 7.00 52.00 Foreign Interference 34.00 3.00 -- 4.00 13.00 1.00 2.00 14.00 71.00 Fire -- 2.00 -- 1.00 6.00 3.00 1.00 85.00 98.00 Vandalism, Terrorism, or Malicious Acts -- -- -- -- 2.00 -- -- 1.00 3.00 Failed AC Substation Equipment 18.00 16.00 35.00 63.00 57.00 16.00 15.00 65.00 285.00

450

3D packaging for integrated circuit systems  

SciTech Connect (OSTI)

A goal was set for high density, high performance microelectronics pursued through a dense 3D packing of integrated circuits. A {open_quotes}tool set{close_quotes} of assembly processes have been developed that enable 3D system designs: 3D thermal analysis, silicon electrical through vias, IC thinning, mounting wells in silicon, adhesives for silicon stacking, pretesting of IC chips before commitment to stacks, and bond pad bumping. Validation of these process developments occurred through both Sandia prototypes and subsequent commercial examples.

Chu, D.; Palmer, D.W. [eds.

1996-11-01T23:59:59.000Z

451

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

wind with transmission alternative 7b (500 kV AC line fromkV line CAISO - A4 Central California Clean Energy TransmissionTransmission Line: Transmission Development Facilities Application Volume One MATL New 230 kV

Wiser, Ryan

2014-01-01T23:59:59.000Z

452

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Analysis of core damage frequency from internal events for Plant Operational State 5 during a refueling outage. Volume 2, Part 3: Internal Events Appendices I and J  

SciTech Connect (OSTI)

This report provides supporting documentation for various tasks associated with the performance of the probablistic risk assessment for Plant Operational State 5 during a refueling outage at Grand Gulf, Unit 1 as documented in Volume 2, Part 1 of NUREG/CR-6143.

Yakle, J. [Science Applications International Corp., Albuquerque, NM (United States); Darby, J. [Science and Engineering Associates, Inc., Albuquerque, NM (United States); Whitehead, D.; Staple, B. [Sandia National Labs., Albuquerque, NM (United States)

1994-06-01T23:59:59.000Z

453

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

454

Magnetically insulated transmission line oscillator  

DOE Patents [OSTI]

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

455

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

456

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

457

Transmission/Resource Library | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transmission/Resource Library < Transmission Jump to: navigation, search ResourceLibraryHeader.png Public Involvement Resources GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database About Transmission Electricity Transmission: A Primer Overview of the grid system and the role of states in overseeing this system. The Design, Construction, and Operation of Long-Distance High-Voltage

458

Regional Transmission Planning Webinar | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

459

California/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Summary < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In California, the California Public Utilities Commission (CPUC) has authority to site transmission lines of 200kV or higher. The CPUC is authorized to approve or deny the applicant's request for the Certificate

460

Transmission Electron Microscope and Scanning Electron Microscopes -  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities > Transmission Electron Facilities > Transmission Electron Microscope and Scanning Electron Microscopes FACILITIES Transmission Electron Microscope and Scanning Electron Microscopes Overview Other Facilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Transmission Electron Microscope and Scanning Electron Microscopes The research activities of the Corrosion and Mechanics of Materials Section are supported by complete metallography/sample preparation rooms equipped with several optical and electron microscopes: a Transmission Electron Microscope and two Scanning Electron Microscopes. Bookmark and Share Transmission electron microscope (TEM) Detail of JEOL 100CXII TEM Figure 1: Detail of JEOL 100CXII TEM. Click on image to view larger image.

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners  

Broader source: Energy.gov [DOE]

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada border.

462

Laser Micromachining of Active and Passive Photonic Integrated Circuits  

E-Print Network [OSTI]

This thesis describes the development of advanced laser resonators and applications of laserinduced micromachining for photonic circuit fabrication. Two major advantages of laserinduced micromachining are direct patterning ...

Cho, Seong-Ho

2006-06-28T23:59:59.000Z

463

Circuit Topology Study of Grid-Connected Photovoltaic System.  

E-Print Network [OSTI]

??Many different circuit topologies have been suggested for large scale photovoltaic systems. The cost and the efficiency are still the major issues of large scale (more)

Mansouri, Seyed Akbar

2011-01-01T23:59:59.000Z

464

6.012 Microelectronic Devices and Circuits, Fall 2003  

E-Print Network [OSTI]

Modeling of microelectronic devices, and basic microelectronic circuit analysis and design. Physical electronics of semiconductor junction and MOS devices. Relation of electrical behavior to internal physical processes; ...

Fonstad, Clifton G.

465

Graphene-based plasmonic waveguides for photonic integrated circuits  

Science Journals Connector (OSTI)

We perform experimental investigations on the characteristics of graphene-based plasmonic waveguides for development of photonic integrated circuits. By embedding chemical vapor...

Kim, Jin Tae; Choi, Sung-Yool

2011-01-01T23:59:59.000Z

466

Derivative-free Robust Optimization for Circuit Design  

E-Print Network [OSTI]

Keywords Robust Optimization Derivative-free Methods Circuit Design ... uncertainty in real-world applications. ... no first order information is available (

2013-09-27T23:59:59.000Z

467

Reliable and economical circuit I V characterization solar cells  

Science Journals Connector (OSTI)

A transistorized circuit for solar cells which is easy to assemble and use for undergraduate teaching laboratories is described.(AIP)

Y. H. Muoy; J. P. Charles; M. Adbelkrim

1981-01-01T23:59:59.000Z

468

Development of nickel silicide for integrated circuit technology.  

E-Print Network [OSTI]

?? Continuous advancements in devices, materials and processes have resulted in integrated circuits with smaller device dimensions, higher functionality and higher speed. The complementary metal (more)

Do, Phu H.

2006-01-01T23:59:59.000Z

469

Design for manufacturability with regular fabrics in digital integrated circuits  

E-Print Network [OSTI]

Integrated circuit design is limited by manufacturability. As devices scale down, sensitivity to process variation increases dramatically, making design for manufacturability a critical concern. Designers must identify the ...

Gazor, Mehdi (Seyed Mehdi)

2005-01-01T23:59:59.000Z

470

Junction Temperature Measurement of IGBTs Using Short Circuit Current  

SciTech Connect (OSTI)

In this paper, a method is proposed to measure the junction temperatures of IGBT discrete devices and modules using short circuit current. Experimental results show that the short circuit current has good sensitivity, linearity and selectivity, which is suitable to be used as temperature sensitive electrical parameters (TSEP). Test circuit and hardware design are proposed for junction temperature measurement in single phase and three phase convertes. By connecting a temperature measurement unit to the converter and giving a short circuit pulse, the IGBT junction temperature can be measured.

Wang, Fei [ORNL; Xu, Zhuxian [ORNL; Ning, Puqi [ORNL

2012-01-01T23:59:59.000Z

471

Uncertainty Quantification for Nano-Scale Integrated Circuits...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Uncertainty Quantification for Nano-Scale Integrated Circuits and MEMS Design Event Sponsor: Mathematics and Computing Science Seminar Start Date: Jan 20 2015 - 10:30am Building...

472

NREL: Transmission Grid Integration - Research Staff  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Staff Research Staff NREL's transmission grid integration research staff work to incorporate renewable energy into the transmission system primarily through NREL's Power Systems Engineering Center. Photo of Barbara O'Neill Barbara O'Neill, Transmission and Grid Integration Group Manager M.S., Energy Management and Policy, University of Pennsylvania Engineering Diploma, Petroleum Economics and Management, French Institute of Petroleum B.S., Electrical Engineering, Pratt Institute Barbara has a diverse background with expertise in such fields as wind and solar project development, energy forecasting, renewable energy power purchase agreements, interconnection issues, market structures, and stakeholder engagement. Barbara currently manages the Transmission and Grid

473

RRTT - Rapid Response Team for Transmission  

Broader source: Energy.gov (indexed) [DOE]

Rapid Response Team- Rapid Response Team- Transmission Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West TRIBAL LEADER FORUM SERIES February 7, 2012 Laura Smith Morton Department of Energy Laura.morton@hq.doe.gov Nine Agency MOU * Improves uniformity, consistency, and transparency - Establishes the roles and responsibilities of the nine signatory agencies regarding electric transmission infrastructure project applicants * Provides single point of contact for coordinating all federal authorizations required to locate electric transmission facilities on federal land * Establishes DOE (under authority pursuant to section 216(h) of the FPA) as lead agency for coordinating all federal authorizations and related environmental

474

Richard Shaheen named Senior VP of Transmission  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and operational accomplishments that will serve BPA well as we continue to strengthen our safety culture, sustain our core transmission assets and modernize our electric grid."...

475

Category:NEPA Transmission | Open Energy Information  

Open Energy Info (EERE)

Pages in category "NEPA Transmission" This category contains only the following page. T TransWest Retrieved from "http:en.openei.orgwindex.php?titleCategory:NEPATransmiss...

476

Intelligent fault diagnosis of power transmission line; -.  

E-Print Network [OSTI]

??This dissertation presents the application of recent intelligent newlinetechniques for fault diagnosis in electrical power transmission line Fault newlinesection identification classification and location are the (more)

Malathi, V

2014-01-01T23:59:59.000Z

477

Big Bend-Witten Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Bend-Witten Transmission Line Project The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared a draft environmental...

478

Natural Gas Transmission and Distribution Module  

U.S. Energy Information Administration (EIA) Indexed Site

31, 2012, Washington, DC Major assumption changes for AEO2013 Oil and Gas Working Group Natural Gas Transmission and Distribution Module DRAFT WORKING GROUP PRESENTATION DO NOT...

479

Detonator comprising a nonlinear transmission line  

DOE Patents [OSTI]

Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

Elizondo-Decanini, Juan M

2014-12-30T23:59:59.000Z

480

1993 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect (OSTI)

Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

US Bonneville Power Administration

1993-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Technologies and Systems Pipeline Transmission of Hydrogen Strategic Initiatives for Hydrogen Delivery Workshop May 7- 8, 2003 U.S. Department of Energy Hydrogen, Fuel Cells,...

482

Nevada Transmission Siting Information | Open Energy Information  

Open Energy Info (EERE)

Siting Information Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Nevada Transmission Siting...

483

Transmission/Permitting Atlas | Open Energy Information  

Open Energy Info (EERE)

mittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah...

484

Webinar: Understanding the Interconnection and Transmission Service...  

Broader source: Energy.gov (indexed) [DOE]

Tribal Energy Sufficiency and Economic Development U.S. Department of Energy Schedules Regional Workshops to Provide Expert Input on 2009 Transmission Congestion Study U.S....

485

Iran Thomas Auditorium, 8600 Environmental Transmission Electron...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 26, 2012 11:00 am Iran Thomas Auditorium, 8600 Environmental Transmission Electron Microscopy for Catalysis Research: The Example of Carbon Nanotubes Eric A. Stach Center for...

486

Electricity Transmission, A Primer | Open Energy Information  

Open Energy Info (EERE)

A Primer Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Electricity Transmission, A Primer Authors Matthew H. Brown, National Conference of State...

487

SunZia Southwest Transmission Project Comments  

Energy Savers [EERE]

Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

488

Williston to Stateline Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Williston to Stateline Transmission Line Project, ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental...

489

Exploring the Business Link Opportunity: Transmission & Clean...  

Energy Savers [EERE]

Jennifer Weddle, Greenberg Traurig LLP Rapid Response Team for Transmission: Laura Smith Morton, DOE Energy Storage: Michael Stosser, Day Pitney LLP Centennial West Clean...

490

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

491

Crews repair transmission lines after Washington wildfire  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Privacy Publications Tribal Affairs Newsroom Search News Articles... Search Crews repair transmission lines after Washington wildfire 662014 12:00 AM Tweet Page Content BPA...

492

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

493

Final Report Navajo Transmission Project (NTP)  

SciTech Connect (OSTI)

The Din Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

Bennie Hoisington; Steven Begay

2006-09-14T23:59:59.000Z

494

Interrogator system for identifying electrical circuits  

DOE Patents [OSTI]

A system for interrogating electrical leads to correctly ascertain the identity of equipment attached to remote ends of the leads is disclosed. The system includes a source of a carrier signal generated in a controller/receiver to be sent over the leads and an identifier unit at the equipment. The identifier is activated by command of the carrier and uses a portion of the carrier to produce a supply voltage. Each identifier is uniquely programmed for a specific piece of equipment, and causes the impedance of the circuit to be modified whereby the carrier signal is modulated according to that program. The modulation can be amplitude, frequency or phase modulation. A demodulator in the controller/receiver analyzes the modulated carrier signal, and if a verified signal is recognized displays and/or records the information. This information can be utilized in a computer system to prepare a wiring diagram of the electrical equipment attached to specific leads. Specific circuit values are given for amplitude modulation, and the system is particularly described for use with thermocouples. 6 figs.

Jatko, W.B.; McNeilly, D.R.

1988-04-12T23:59:59.000Z

495

Hydraulic actuator for an electric circuit breaker  

DOE Patents [OSTI]

This actuator comprises a fluid motor having a piston, a breaker-opening space at one side of the piston, and a breaker-closing space at its opposite side. An accumulator freely communicates with the breaker-opening space for supplying pressurized fluid thereto during a circuit breaker opening operation. The breaker-opening space and the breaker-closing space are connected by an impeded flow passage. A pilot valve opens to allow the pressurized liquid in the breaker-closing space to flow to a back chamber of a normally closed main valve to cause the main valve to be opened during a circuit breaker opening operation to release the pressurized liquid from the breaker-closing space. An impeded passage affords communication between the back chamber and a sump located on the opposite side of the main valve from the back chamber. The pilot valve and impeded passage allow rapid opening of the main valve with pressurized liquid from the breaker closing side of the piston. 3 figs.

Imam, I.

1983-05-17T23:59:59.000Z

496

134 IEEE TRANSACTIONS ON RELIABILITY, VOL. 60, NO. 1, MARCH 2011 Exploring Complex Systems Aspects of  

E-Print Network [OSTI]

loading OPA Simulation of evolving network with cascading transmission line outages; Initial letters outage due to external physical cause Probability for an overloaded transmission line to outage Average transmission line joining node to node Maximum power flow through transmission line joining node to node

Dobson, Ian

497

Comments of New England Electric Transmission Corporation on Proposed Open  

Broader source: Energy.gov (indexed) [DOE]

New England Electric Transmission Corporation on New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Motion to intervene out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and New England Power Company. Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities FE Docket No 99-1 (PP-76/EA-76) More Documents & Publications Ontario Power Generation Motion to Intervene & Comments in FE Docket No.

498

Monitoring transients in low inductance circuits  

DOE Patents [OSTI]

A pair of flat cable transmission lines are monitored for transient current spikes by using a probe connected to a current transformer by a pickup loop and monitoring the output of the current transformer. The approach utilizes a U-shaped pickup probe wherein the pair of flat cable transmission lines are received between the legs of the U-shaped probe. The U-shaped probe is preferably formed of a flat coil conductor adhered to one side of a flexible substrate. On the other side of the flexible substrate there is a copper foil shield. The copper foil shield is connected to one end of the flat conductor coil and connected to one leg of the pickup loop which passes through the current transformer. The other end of the flat conductor coil is connected to the other leg of the pickup loop.

Guilford, Richard P. (Albuquerque, NM); Rosborough, John R. (Albuquerque, NM)

1987-01-01T23:59:59.000Z

499

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

SEC). 2008. Form 10-K: Xcel Energy Inc. http://www.sec.gov/cost of transmission proposed in Xcel Energy 2001). SouthernApril. http://www.ftloutreach.com Xcel Energy Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

500

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network [OSTI]

at: http://www.ftloutreach.com Xcel Energy, TransmissionCBED CapX Utilities Midwest Xcel Energy Voluntary UtilityElectric Transmission Study Xcel-31A Southwest Power Pool (

Mills, Andrew; Wiser, Ryan; Porter, Kevin