Transmission outage data collection for multiple related outage events  

SciTech Connect

This paper focuses on the information required to provide a basis for the analysis of forced multiple outage events. It recaps research as well as the bulk transmission outage collection up-rate that was performed. This paper identifies trends and addresses their impact on bulk transmission outage data collection.

Lauby, M.G. (Electric Power Research Inst., Palo Alto, CA (USA)); Maillant, G.R. (Electricite de France (EDF)

1989-01-01T23:59:59.000Z

2

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

3

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

4

Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Pursuant to the United States Department of Energy Order No. 202-05-03, issued December 20, 2005 directing Mirant Potomac River to generate electricity at Potomac River Generating Station, PEPCO hereby files this Further Notice of 230kV Circuit Planned Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages More Documents & Publications Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Re: Potomac River Generating Station Department of Energy Case No.

5

Outage-Efficient Downlink Transmission Without Transmit Channel State Information  

E-Print Network (OSTI)

This paper investigates downlink transmission over a quasi-static fading Gaussian broadcast channel (BC), to model delay-sensitive applications over slowly time-varying fading channels. System perfor-mance is characterized by outage achievable rate regions. In contrast to most previous work, here the problem is studied under the key assumption that the transmitter only knows the probability distributions of the fading coefficients, but not their realizations. For scalar-input channels, two coding schemes are proposed. The first scheme is called blind dirty paper coding (B-DPC), which utilizes a robustness property of dirty paper coding to perform precoding at the transmitter. The second scheme is called statistical superposition coding (S-SC), in which each receiver adaptively performs successive decoding with the process statistically governed by the realized fading. Both B-DPC and S-SC schemes lead to the same outage achievable rate region, which always dominates that of time-sharing, irrespective of the particular fading distributions. The S-SC scheme can be extended to BCs with multiple transmit antennas. Index Terms Broadcast channel, (blind) dirty paper coding, downlink, non-ergodic fading, outage achievable rate region, quasi-static fading, (statistical) superposition coding

Wenyi Zhang; Shivaprasad Kotagiri; Student Member; J. Nicholas Laneman; Senior Member

2007-01-01T23:59:59.000Z

6

Current industry practices in bulk transmission outage data collection and analysis  

SciTech Connect

This paper focuses on the state-of-the-art bulk transmission outage data collection and analysis. Included in this discussion is the motivation for interest, single/multiple outage event analysis, and identification of where to obtain data on weather conditions which impact the performance of bulk transmission.

Not Available

1992-02-01T23:59:59.000Z

7

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

8

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

9

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission lines between two adjacent periodic intersections to be longer than the other. 5 figs.

Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; deGrassie, J.S.

1990-03-02T23:59:59.000Z

10

Potomac River Project Outage Schedule Clarification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Notification of Planned 230kV Outage at Potomac River Generating Station PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the

11

1 On Downlink Transmission Without Transmit Channel State Information and With Outage Constraints  

E-Print Network (OSTI)

This paper investigates downlink transmission over a quasi-static fading Gaussian broadcast channel (BC), to model delay-sensitive applications over slowly time-varying fading channels. System performance is characterized by the outage capacity region. In contrast to most previous work, here the problem is studied under the key assumption that the transmitter knows only the probability distributions of the fading coefficients, not their realizations. For scalar-input channels, two coding schemes are studied. The first scheme is called blind dirty paper coding (B-DPC), which utilizes a robustness property of dirty paper coding to perform precoding at the transmitter. The second scheme is called statistical superposition coding (S-SC), in which each receiver adaptively performs successive decoding with the process statistically governed by the realized fading. Both B-DPC and S-SC schemes achieve the outage capacity region, which dominates the outage rate region of time-sharing, irrespective of the particular

Wenyi Zhang; Shiva Prasad Kotagiri; J. Nicholas Laneman; Senior Member

2009-01-01T23:59:59.000Z

12

Potomac River Project Outage Schedule Clarification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River Project Outage Schedule Clarification River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

13

1 Outage-Efficient Downlink Transmission Without Transmit Channel State Information  

E-Print Network (OSTI)

This paper investigates downlink transmission over a quasi-static fading Gaussian broadcast channel (BC), to model delay-sensitive applications over slowly time-varying fading channels. System performance is characterized by outage achievable rate regions. In contrast to most previous work, here the problem is studied under the key assumption that the transmitter only knows the probability distributions of the fading coefficients, but not their realizations. For scalar-input channels, two coding schemes are proposed. The first scheme is called blind dirty paper coding (B-DPC), which utilizes a robustness property of dirty paper coding to perform precoding at the transmitter. The second scheme is called statistical superposition coding (S-SC), in which each receiver adaptively performs successive decoding with the process statistically governed by the realized fading. Both B-DPC and S-SC schemes lead to the same outage achievable rate region, which always dominates that of time-sharing, irrespective of the particular fading distributions. The S-SC scheme can be extended to BCs with multiple transmit antennas. Index Terms Broadcast channel, (blind) dirty paper coding, downlink, non-ergodic fading, outage achievable rate region, quasi-static fading, (statistical) superposition coding

Wenyi Zhang; Shivaprasad Kotagiri; Student Member; J. Nicholas Laneman; Senior Member

2008-01-01T23:59:59.000Z

14

Definition: Sustained Outage | Open Energy Information  

Open Energy Info (EERE)

Sustained Outage Sustained Outage Jump to: navigation, search Dictionary.png Sustained Outage The deenergized condition of a transmission line resulting from a fault or disturbance following an unsuccessful automatic reclosing sequence and/or unsuccessful manual reclosing procedure.[1] View on Wikipedia Wikipedia Definition A power outage (also power cut, blackout, or power failure) is a short- or long-term loss of the electric power to an area. There are many causes of power failures in an electricity network. Examples of these causes include faults at power stations, damage to electric transmission lines, substations or other parts of the distribution system, a short circuit, or the overloading of electricity mains. Power failures are particularly critical at sites where the environment and public safety are

15

Outage Log  

NLE Websites -- All DOE Office Websites (Extended Search)

For Users Live Status Global Queue Look Scheduled Outages Outage Log Edison Login Node Status Hopper Login Node Status Hopper User Environment Monitoring Carver Login Node Status...

16

High speed, long distance, data transmission multiplexing circuit  

DOE Patents (OSTI)

A high speed serial data transmission multiplexing circuit, which is operable to accurately transmit data over long distances (up to 3 Km), and to multiplex, select and continuously display real time analog signals in a bandwidth from DC to 100 Khz. The circuit is made fault tolerant by use of a programmable flywheel algorithm, which enables the circuit to tolerate one transmission error before losing synchronization of the transmitted frames of data. A method of encoding and framing captured and transmitted data is used which has a low overhead and prevents some particular transmitted data patterns from locking an included detector/decoder circuit.

Mariotti, Razvan (Boulder, CO)

1991-01-01T23:59:59.000Z

17

A high speed, long distance, data transmission multiplexing circuit  

DOE Patents (OSTI)

A high speed serial data transmission multiplexing circuit, which is operable to accurately transmit data over long distances (up to 3 Km), and to multiplex, select and continuously display real time analog signals in a bandwidth from DC to 100Khz. The circuit is made fault tolerant by use of a programmable flywheel algorithm, which enables the circuit to tolerate one transmission error before losing synchronization of the transmitted frames of data. A method of encoding and framing captured and transmitted data is used which has a low overhead and prevents some particular transmitted data patterns from locking an included detector/decoder circuit. 9 figs.

Mariotti, R.

1990-01-30T23:59:59.000Z

18

Comments from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMONWEALTH of VIRGINIA COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY Street address: 629 East Main Street, Richmond, Virginia 23219 Mailing address: P.O. Box 10009, Richmond, Virginia 23240 Fax (804) 698-4500 TDD (804) 698-4021 www.deq.virginia.gov W. Tayloe Murphy, Jr. Secretary of Natural Resources Robert G. Burnley Director (804) 698-4000 1-800-592-5482 January 5, 2006 The Honorable Samuel W. Bodman Secretary of Energy United States Department of Energy 1000 Independence Avenue, S.W. Washington, D.C. 20585 Re: District of Columbia Public Service Commission Docket No. EO-05-01 Dear Secretary Bodman: The Virginia Department of Environmental Quality (DEQ) strongly opposes the Potomac Electric Power Company's (PEPCO) intention to commence planned maintenance outages of the

19

Multimode circuit QED with hybrid metamaterial transmission lines  

E-Print Network (OSTI)

Quantum transmission lines are a central to superconducting and hybrid quantum computing. Parallel to these developments are those of left-handed meta-materials. They have a wide variety of applications in photonics from the microwave to the visible range such as invisibility cloaks and perfect flat lenses. For classical guided microwaves, left-handed transmission lines have been proposed and studied on the macroscopic scale. We combine these ideas in presenting a left-handed/right-handed hybrid transmission line for applications in quantum optics on a chip. The resulting system allows circuit QED to reach a new regime: multi-mode ultra-strong coupling. Out of the many potential applications of this novel device, we discuss two; the preparation of multipartite entangled states and its use as a quantum simulator for the spin-boson model where a quantum phase transition is reached up to finite size-effects.

Daniel J. Egger; Frank K. Wilhelm

2013-02-22T23:59:59.000Z

20

AN INFINITE DIMENSIONAL DESCRIPTOR SYSTEM MODEL FOR ELECTRICAL CIRCUITS WITH TRANSMISSION LINES  

E-Print Network (OSTI)

AN INFINITE DIMENSIONAL DESCRIPTOR SYSTEM MODEL FOR ELECTRICAL CIRCUITS WITH TRANSMISSION LINES TIMO REIS Abstract. In this paper a model of linear electrical circuits with transmission lines is de-coupled with the telegraph equations who describe the behavior of the transmission lines. The resulting system of equations

Reis, Timo

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Power outages often spur questions around burying power lines ...  

U.S. Energy Information Administration (EIA)

Smart grid technology, which would allow a utility to pinpoint problems, divert power through other circuits to minimize outages, and optimize crew deployments is ...

22

Improving Outage Performance: Outage Optimization Process  

SciTech Connect

Planned outage performance is a key measure of how well an Nuclear Power Plant (NPP) is operated. Performance during planned outages strongly affects virtually all of a plant's performance metrics. In recognition of this fact, NPP operators worldwide have and continue to focus on improving their outage performance. The process of improving outage performance is commonly referred to as 'Outage Optimization' in the industry. This paper starts with a summary of the principles of Outage Optimization. It then provides an overview of a process in common use in the USA and elsewhere to manage the improvement of planned outages. The program described is comprehensive in that it involves managing improvement in both the Preparation and Execution phases of outage management. (author)

LaPlatney, Jere J. [AREVA NP (United States)

2006-07-01T23:59:59.000Z

23

Transmission Line Inspires A New Distributed Algorithm to Solve the Nonlinear Dynamical System of Physical Circuit  

E-Print Network (OSTI)

As known, physical circuits, e.g. integrated circuits or power system, work in a distributed manner, but these circuits could not be easily simulated in a distributed way. This is mainly because that the dynamical system of physical circuits is nonlinear and the linearized system of physical circuits is non-symmetrical. This paper proposes a simple and natural strategy to simulate the physical circuit in parallel, by mimicking the internal wires or interconnects inside the circuits by distributed numerical algorithm. Mimic Transmission Method (MTM) is a new distributed numerical algorithm to solve the nonlinear ordinary differential equations extracted from physical circuits. It maps the transmission delay of interconnects between subcircuits to the communication delay of digital data link between processors. MTM is not a global iterative algorithm, and it does only one distributed computation at each time window to obtain accurate result, so unconvergence issues do not need to be worried about.

Wei, Fei

2010-01-01T23:59:59.000Z

24

Outage Management Benchmarking Guideline  

Science Conference Proceedings (OSTI)

Benchmarking of power plant outages will help plants target performance improvements to specific elements of a plant outage program in order to improve overall availability, reliability, and safety while decreasing generation costs. EPRI's "Outage Management Benchmarking Guideline" builds on the Institute's fossil and nuclear plant experience with routine maintenance and extends that to outage maintenance processes. The guideline describes the initial steps in an outage benchmarking effort and 13 key ele...

2003-03-26T23:59:59.000Z

25

Outage Effectiveness Measurement Methodology  

Science Conference Proceedings (OSTI)

The efficiency of an outage program and the correctness of the outage process are important to the continuous improvement and long-term success of the plant. This report, based on a collective of industry experience, EPRI publications, and power conference data, is an aid to utility and plant management and staff to understanding the outage effectiveness methods and metrics relative to outage planning, execution, and post-outage operations.

2004-12-15T23:59:59.000Z

26

Field Guide: High-Voltage Circuit Breaker Compressors – 2013 Update  

Science Conference Proceedings (OSTI)

High-voltage circuit breakers (HVCBs) perform essential protection and control functions on power transmission networks. Circuit breaker mechanisms have multiple components that must operate in concert in order for the breaker to perform properly. If one component, such as the air or hydraulic system, does not operate correctly, the circuit breaker may mis-operate or fail. A circuit breaker mis-operation may cause equipment damage and outages—both ...

2013-12-19T23:59:59.000Z

27

Definition: Forced Outage | Open Energy Information  

Open Energy Info (EERE)

Forced Outage Forced Outage Jump to: navigation, search Dictionary.png Forced Outage The removal from service availability of a generating unit, transmission line, or other facility for emergency reasons., The condition in which the equipment is unavailable due to unanticipated failure.[1] Related Terms transmission lines, transmission line References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Forced_Outage&oldid=480310" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties About us Disclaimers Energy blogs Linked Data

28

MIMO ARQ with Multi-bit Feedback: Outage Analysis  

E-Print Network (OSTI)

We study the asymptotic outage performance of incremental redundancy automatic repeat request (INR-ARQ) transmission over the multiple-input multiple-output (MIMO) block-fading channels with discrete input constellations. We first show that transmission with random codes using a discrete signal constellation across all transmit antennas achieves the optimal outage diversity given by the Singleton bound. We then analyze the optimal SNR-exponent and outage diversity of INR-ARQ transmission over the MIMO block-fading channel. We show that a significant gain in outage diversity is obtained by providing more than one bit feedback at each ARQ round. Thus, the outage performance of INR-ARQ transmission can be remarkably improved with minimal additional overhead. A suboptimal feedback and power adaptation rule, which achieves the optimal outage diversity, is proposed for MIMO INR-ARQ, demonstrating the benefits provided by multi-bit feedback.

Nguyen, Khoa D; Fabregas, Albert Guillen i; Letzepis, Nick

2010-01-01T23:59:59.000Z

29

Field Guide: Compressors for High-Voltage Circuit Breakers  

Science Conference Proceedings (OSTI)

High-voltage circuit breakers (HVCBs) perform essential protection and control functions on power transmission networks. Circuit breakers have multiple components that must operate in concert in order for the breaker to perform properly. If one component, such as the air or hydraulic system, does not operate correctly, the circuit breaker may misoperate or fail, possibly resulting in equipment damage or an outage—both expensive consequences. To help ...

2012-12-14T23:59:59.000Z

30

Dynamic and short-circuit power of CMOS gates driving lossless transmission lines  

E-Print Network (OSTI)

Abstract—The dynamic and short-circuit power consumption of a complementary metal–oxide–semidconductor (CMOS) gate driving an inductance–capacitance (LC) transmission line as a limiting case of an RLC transmission line is investigated in this paper. Closed-form solutions for the output voltage and shortcircuit power of a CMOS gate driving an LC transmission line are presented. A closed form solution for the short-circuit power is also presented. These solutions agree with circuit simulations within 11 % error for a wide range of transistor widths and line impedances for a 0.25-"m CMOS technology. The ratio of the short circuit to dynamic power is shown to be less than 7 % for CMOS gates driving LC transmission lines where the line is matched or underdriven. The total power consumption is expected to decrease as inductance effects becomes more significant as compared to a resistance–capacitance (RC)-dominated interconnect line. Index Terms—CMOS, dynamic, interconnect, LC, power dissipation, RC, RLC, short-circuit, transmission lines.

Yehea I. Ismail; Eby G. Friedman; Senior Member; Jose Luis Neves

1999-01-01T23:59:59.000Z

31

Field Guide: Lubrication of High-Voltage Circuit Breakers - 2013 Update  

Science Conference Proceedings (OSTI)

High-voltage circuit breakers (HVCBs) perform essential protection and control functions on power transmission networks. Circuit breaker mechanisms have multiple components that must operate in concert in order for the breaker to perform properly. If one component does not operate correctly, the circuit breaker may mis-operate or fail. A circuit breaker mis-operation may cause equipment damage and outages—both expensive consequences. Proper lubrication ...

2013-12-19T23:59:59.000Z

32

North American Electric Reliability Council Power Outage Update |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Outage Update Power Outage Update North American Electric Reliability Council Power Outage Update The bulk electric transmission system in the United States and Canada has been restored and is operating reliably. Many of the generating units that tripped off line during the outage have returned to service and additional generating units are expected to return to service over the weekend. Virtually all customers have been returned to electric service, although some customers will continue to experience rotating outages due to generating capacity availability. North American Electric Reliability Council Power Outage Update More Documents & Publications Electric System Update: Sunday August 17, 2003 North American Electric Reliability Council Outage Announcement NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report

33

August 14, 2003 Power Outages Â… Announcement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ellen P. Vancko Ellen P. Vancko evancko@nerc.com Power Outage Update ⎯ 8/16/2003 11 a.m. EDT The bulk electric transmission system in the United States and Canada has been restored and is operating reliably. Many of the generating units that tripped off line during the outage have returned to service and additional generating units are expected to return to service over the weekend. Virtually all customers have been returned to electric service, although some customers will continue to experience rotating outages due to generating capacity availability. Some rotating outages may also be necessary on Monday depending on the status of the generating units returning to service and the electrical demand. "NERC is conducting a thorough investigation into this event in conjunction with the regional

34

Notification of Planned 230kV Outage at Potomac River Generating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The next planned outage on xxxxx high voltage circuit between Palmers Corner Substation and the Potomac River Generating Station is scheduled for Sunday, June 3, 2007 and will...

35

Notice of Unplanned Outage at the Mirant Potomac River Plant | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unplanned Outage at the Mirant Potomac River Plant Unplanned Outage at the Mirant Potomac River Plant Notice of Unplanned Outage at the Mirant Potomac River Plant Docket No. EO-05-01. Order No. 202-05-03: Pursuant to the United States Department of Energy ("DOE") Order No_ 202-05-3, issued December 20, 2005 ("DOE Potomac River Order"), Pepco hereby files this notice of an unplanned outage of one of the 230kV circuits serving the Potomac River Substation, and through that station, the District of Columbia. Notice of Unplanned Outage at the Mirant Potomac River Plant More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Further Notice of 230kV Circuit Planned Outages

36

Minimum-outage broadcast in wireless networks with fading channels  

Science Conference Proceedings (OSTI)

We consider the problem of cooperative broadcasting for minimum outage in wireless networks. We consider wireless multihop broadcast as a set of transmitters that transmit in a certain order. The receiving nodes are able to combine all the previous transmissions ... Keywords: broadcast, multicast, outage, wireless networks

Tolga Girici; Gulizar Duygu Kurt

2010-07-01T23:59:59.000Z

37

Transmission of information and synchronization in a pair of coupled chaotic circuits: an experimental overview  

E-Print Network (OSTI)

We propose a rationale for experimentally studying the intricate relationship between the rate of information transmission and synchronization level in active networks, applying theoretical results recently proposed. We consider two non-identical coupled Chua's circuit with non-identical coupling strengths in order to illustrate the proceeding for experimental scenarios of very few data points coming from highly non-coherent coupled systems, such that phase synchronization can only be detected by methods that do not rely explicitely on the calculation of the phase. A relevant finding is to show that for the coupled Chua's circuit, the larger the level of synchronization the larger the rate of information exchanged between both circuits. We further validate our findings with data from numerical simulations, and discuss an extension to arbitrarily large active networks.

M. S. Baptista; S. P. Garcia; S. K. Dana; J. Kurths

2008-02-21T23:59:59.000Z

38

Definition: Cascading Outage | Open Energy Information  

Open Energy Info (EERE)

Cascading Outage Cascading Outage Jump to: navigation, search Dictionary.png Cascading Outage The uncontrolled successive loss of system elements triggered by an incident at any location. Cascading results in widespread electric service interruption that cannot be restrained from sequentially spreading beyond an area predetermined by studies.[1] View on Wikipedia Wikipedia Definition A cascading failure is a failure in a system of interconnected parts in which the failure of a part can trigger the failure of successive parts. Such a failure may happen in many types of systems, including power transmission, computer networking, finance and bridges. Cascading failures usually begin when one part of the system fails. When this happens, nearby nodes must then take up the slack for the failed component. This overloads

39

Contingency Analysis of Cascading Line Outage Events  

SciTech Connect

As the US power systems continue to increase in size and complexity, including the growth of smart grids, larger blackouts due to cascading outages become more likely. Grid congestion is often associated with a cascading collapse leading to a major blackout. Such a collapse is characterized by a self-sustaining sequence of line outages followed by a topology breakup of the network. This paper addresses the implementation and testing of a process for N-k contingency analysis and sequential cascading outage simulation in order to identify potential cascading modes. A modeling approach described in this paper offers a unique capability to identify initiating events that may lead to cascading outages. It predicts the development of cascading events by identifying and visualizing potential cascading tiers. The proposed approach was implemented using a 328-bus simplified SERC power system network. The results of the study indicate that initiating events and possible cascading chains may be identified, ranked and visualized. This approach may be used to improve the reliability of a transmission grid and reduce its vulnerability to cascading outages.

Thomas L Baldwin; Magdy S Tawfik; Miles McQueen

2011-03-01T23:59:59.000Z

40

Extended outages at several nuclear plants led to high outage ...  

U.S. Energy Information Administration (EIA)

Outages at U.S. nuclear power plants so far in 2012 are generally higher than in recent years because of extended forced outages at four nuclear power plants.

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Homeowners: Respond to Power Outages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Outages Power Outages Homeowners: Respond to Power Outages Homeowners: Respond to Power Outages After a disaster, electric utilities and government officials will first work to restore power to critical infrastructure like power plants and transmission lines, water treatment facilities, and telecommunications networks, and also to hospitals, critical care facilities, and emergency response agencies. It may take several days or even weeks to restore power to individual homeowners, but here's what you can do to help prepare and recover power more quickly: Charge mobile devices-If you have power, charge your cell phones, laptops, and other mobile devices so they'll have the maximum amount of battery power stored in the event of a power outage. These devices will help you communicate with your power company, and they'll help you stay

42

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notification of Planned 230kV Outage at Potomac River Generating Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned 230kV Outage at Potomac River Generating Station Docket No. EO-05-01. In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of

43

Outage management and health physics issue, 2009  

SciTech Connect

The focus of the May-June issue is on outage management and health physics. Major articles include the following: Planning and scheduling to minimize refueling outage, by Pat McKenna, AmerenUE; Prioritizing safety, quality and schedule, by Tom Sharkey, Dominion; Benchmarking to high standards, by Margie Jepson, Energy Nuclear; Benchmarking against U.S. standards, by Magnox North, United Kingdom; Enabling suppliers for new build activity, by Marcus Harrington, GE Hitachi Nuclear Energy; Identifying, cultivating and qualifying suppliers, by Thomas E. Silva, AREVA NP; Creating new U.S. jobs, by Francois Martineau, Areva NP. Industry innovation articles include: MSL Acoustic source load reduction, by Amir Shahkarami, Exelon Nuclear; Dual Methodology NDE of CRDM nozzles, by Michael Stark, Dominion Nuclear; and Electronic circuit board testing, by James Amundsen, FirstEnergy Nuclear Operating Company. The plant profile article is titled The future is now, by Julia Milstead, Progress Energy Service Company, LLC.

Agnihotri, Newal (ed.)

2009-05-15T23:59:59.000Z

44

Field Guide: Compressors for High-Voltage Circuit Breakers, Optimized for Electronic Viewing  

Science Conference Proceedings (OSTI)

High-voltage circuit breakers perform essential protection and control functions on power transmission networks. A circuit breaker that fails to operate within its design time period may cause serious damage and extended outages. Proper maintenance of compressors can help to ensure that breakers operate reliably and can prevent premature failures. This field guide, which has been optimized for use on electronic devices such as smart phones and tablets, is intended to help utility field personnel properly...

2011-11-09T23:59:59.000Z

45

Outage dose reduction achievements during shorter refueling outages  

SciTech Connect

Achievement of dose reduction goals has been demonstrated at the Limerick Generating Station during the past three refueling outages in 1995-96. Shorter refueling outages were accomplished by carefully selecting outage work and thoroughly planning the work. Limerick Unit 1 completed its outage in 35 d; Unit 2 in 23 d in 1995; Unit 1 completed its outage in 24 d in 1996. The four previous outages at Unit I had taken from 100 to 127 days. European plants were visited by plant supervisors to develop improved management approaches to optimizing outage performance from work planning to work implement. Cofrentes in Spain and KKL Leibstadt in Switzerland were visited in 1994 because of their similar design and outage durations consistently below 35 d. This paper describes the radiation protection practices observed at European plants and implemented at Limerick to achieve efficiency of work practices and adequacy of radiological controls. Specific radiation protection initiatives discussed include electronic dosimetry system, break areas, wash sinks, scrub suits, zone mapping and self-monitoring. Outage achievements in 1995 and 1996 has assured Limerick continued BWR industry leadership as the lowest annual person-rem BWRs in the U.S..

Harris, W.O.; Taylor, S. [Limerick Generating Station, Sanatoga, PA (United States)

1996-06-01T23:59:59.000Z

46

Pinpointing the cause of an outage for something as complex and interconnected as the high voltage transmission system is a ve  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ellen P. Vancko Ellen P. Vancko evancko@nerc.com Electric System Update: Sunday August 17, 2003, 5:00 p.m. The electric transmission system is now operating reliably. All electric power transmission lines that were removed from service during the blackout on August 14, 2003, have been returned to service with one exception. The lines between Michigan and Ontario remain out of service due to operational security reasons; however, they are expected to be returned to service later this evening. Most of the electric generating units that were removed from service during the blackout have now been returned to service (the exact number of units that went out of service is not yet known). Twenty-one of these remain out of service. A number of these generating units are expected to return to service either

47

Notification of Planned 230kV Outage at Potomac River Generating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The next planned outage on xxxxx high voltage circuit between xxxxx and xxxxx is tentatively scheduled for Saturday May 19, 2007 and will begin at 4:00 AM with a scheduled return...

48

Cell outage management in LTE networks  

Science Conference Proceedings (OSTI)

Cell outage management is a functionality aiming to automatically detect and mitigate outages that occur in radio networks due to unexpected failures. We envisage that future radio networks autonomously detect an outage based on measurements, from e.g., ...

M. Amirijoo; L. Jorguseski; T. Kürner; R. Litjens; M. Neuland; L. C. Schmelz; U. Türke

2009-09-01T23:59:59.000Z

49

Experimental evidence for vibrational resonance and enhanced signal transmission in Chua's circuit  

E-Print Network (OSTI)

We consider a single Chua's circuit and a system of a unidirectionally coupled n-Chua's circuits driven by a biharmonic signal with two widely different frequencies \\omega and \\Omega, where \\Omega >> \\omega. We show experimental evidence for vibrational resonance in the single Chua's circuit and undamped signal propagation of a low-frequency signal in the system of n-coupled Chua's circuits where only the first circuit is driven by the biharmonic signal. In the single circuit, we illustrate the mechanism of vibrational resonance and the influence of the biharmonic signal parameters on the resonance. In the n(= 75)-coupled Chua's circuits enhanced propagation of low-frequency signal is found to occur for a wide range of values of the amplitude of the high-frequency input signal and coupling parameter. The response amplitude of the ith circuit increases with i and attains a saturation. Moreover, the unidirectional coupling is found to act as a low-pass filter.

R. Jothimurugan; K. Thamilmaran; S. Rajasekar; M. A. F. Sanjuan

2013-08-12T23:59:59.000Z

50

OpenEI Community - outages  

Open Energy Info (EERE)

have been preparing for an imminent threat that could lead to a substantial and prolonged power outage for utility customers not only on the East Coast, but also as far west as...

51

Microwave and millimeter-wave rectifying circuit arrays and ultra-wideband antennas for wireless power transmission and communications  

E-Print Network (OSTI)

In the future, space solar power transmission and wireless power transmission will play an important role in gathering clean and infinite energy from space. The rectenna, i.e., a rectifying circuit combined with an antenna, is one of the most important components in the wireless power transmission system. To obtain high power and high output voltage, the use of a large rectenna array is necessary. Many novel rectennas and rectenna arrays for microwave and millimeter-wave wireless power transmission have been developed. Unlike the traditional rectifying circuit using a single diode, dual diodes are used to double the DC output voltage with the same circuit layout dimensions. The rectenna components are then combined to form rectenna arrays using different interconnections. The rectennas and the arrays are analyzed by using a linear circuit model. Furthermore, to precisely align the mainbeams of the transmitter and the receiver, a retrodirective array is developed to maintain high efficiency. The retrodirective array is able to track the incident wave and resend the signal to where it came from without any prior known information of the source location. The ultra-wideband radio has become one of the most important communication systems because of demand for high data-rate transmission. Hence, ultra-wideband antennas have received much attention in mobile wireless communications. Planar monopole ultra-wideband antennas for UHF, microwave, and millimeter-wave bands are developed, with many advantages such as simple structure, low cost, light weight, and ease of fabrication. Due to the planar structures, the ultra-wideband antennas can be easily integrated with other circuits. On the other hand, with an ultra-wide bandwidth, source power can be transmitted at different frequencies dependent on power availability. Furthermore, the ultra-wideband antenna can potentially handle wireless power transmission and data communications simultaneously. The technologies developed can also be applied to dual-frequency or the multi-frequency antennas. In this dissertation, many new rectenna arrays, retrodirective rectenna arrays, and ultra-wideband antennas are presented for microwave and millimeter-wave applications. The technologies are not only very useful for wireless power transmission and communication systems, but also they could have many applications in future radar, surveillance, and remote sensing systems.

Ren, Yu-Jiun

2007-05-01T23:59:59.000Z

52

Definition: Reduced Sustained Outages | Open Energy Information  

Open Energy Info (EERE)

Outages Outages Jump to: navigation, search Dictionary.png Reduced Sustained Outages A sustained outage is one lasting >5 minutes, excluding major outages and wide-scale outages. The monetary benefit of reducing sustained outages is based on the value of service (VOS) of each customer class. The VOS parameter represents the total cost of a power outage per MWh. This cost includes the value of unserved energy, lost productivity, collateral damage, administrative costs, the value of penalties and performance-based rates. Functions that lead to this benefit can reduce the likelihood that there will be an outage, allow the system to be reconfigured on the fly to help restore service to as many customers as possible, enable a quicker response in the restoration effort, or mitigate the impact of an outage

53

Notification of Planned 230kV Outage at Potomac River Generating Station  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sent: Wednesday, May 16, 2007 4:49 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: This morning Pepco and PJM observed that the generation at the Potomac River Generating Station was having difficulty matching the station generation requirement to the Potomac River area load. Mirant has also informed Pepco and PJM that several generating units were experiencing equipment problems which required them to reduce unit and total plant output. Based on these observations and information received from Mirant, Pepco has elected to cease the current work activities underway on xxxxx high voltage circuit and we will be placing this transmission line back in service this afternoon.

54

outages | OpenEI Community  

Open Energy Info (EERE)

66 66 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142234866 Varnish cache server outages Home Graham7781's picture Submitted by Graham7781(2002) Super contributor 29 October, 2012 - 14:46 East Coast Utilities prepare for Hurricane Sandy East Coast Hurricane Sandy OpenEI outages storm United States Utility Companies As Hurricane Sandy continues to track towards the coast of the Eastern United States, utility companies have been preparing for an imminent threat that could lead to a substantial and prolonged power outage for utility

55

Examination of the Exacter Outage-Avoidance System  

Science Conference Proceedings (OSTI)

A routine inspection program is one tool that utilities can use to reduce failures on their circuits and minimize customer outages. By identifying problems for repair before they develop into failures, an inspection program can be a cost-effective method for enhancing the quality and reliability of electric service. The present methods used to detect and locate underperforming power system hardware can be time consuming and can involve physical complexities and require line crews with bucket trucks to tr...

2009-11-30T23:59:59.000Z

56

A Survey of National Transmission Grid Modeling Capabilities at DOE  

E-Print Network (OSTI)

. Outages can be predicted, but only in steady state. They expect to have dynamic capabilities in about.g., generator outages, transmission outages, unexpected load variations). The simulation continues when;ramp up/down rates;startup time;shutdown time; minimum down time;forced outage rate; maintenance

Howle, Victoria E.

57

Definition: Reduced Major Outages | Open Energy Information  

Open Energy Info (EERE)

Outages Outages Jump to: navigation, search Dictionary.png Reduced Major Outages A major outage is defined using the beta method, per IEEE Std 1366-2003 (IEEE Power Engineering Society 2004). The monetary benefit of reducing major outages is based on the VOS of each customer class. The VOS parameter represents the total cost of a power outage per MWh. This cost includes the value of unserved energy, lost productivity, collateral damage, the value of penalties and performance-based rates. Functions that lead to this benefit can mitigate major outages by allowing the system to be reconfigured on the fly to help restore service to as many customers as possible, enable a quicker response in the restoration effort, or mitigate the impact of an outage through islanding or alternative power supply.[1]

58

Definition: Outage Management System | Open Energy Information  

Open Energy Info (EERE)

Outage Management System Outage Management System A software application that can process outage reports from a variety of utility operational systems including SCADA, AMI, and customer phone calls, and display outage information to utility operators. The OMS can help a utility interpret outage information and determine where the likely cause of an outage may be. It can also help the utility optimize its service restoration resources.[1] Related Terms advanced metering infrastructure References ↑ https://www.smartgrid.gov/category/technology/outage_management_system [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Outage_Management_System&oldid=502507

59

Broadcast Outages for NIST Radio Station WWVB  

Science Conference Proceedings (OSTI)

... Numerous short outages while station was undergoing maintenance and testing during daylight hours. WWVB operated at reduced power during ...

60

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

In accordance with DOE Order No. 202-05-03 Pepco is In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Definition: Reduced Momentary Outages | Open Energy Information  

Open Energy Info (EERE)

Momentary Outages Momentary Outages Jump to: navigation, search Dictionary.png Reduced Momentary Outages By locating faults more accurately or adding electricity storage, momentary outages could be reduced or eliminated. Moreover, fewer customers on the same or adjacent distribution feeders would experience the momentary interruptions associated with reclosing. Momentary outages last <5 min in duration. The benefit to consumers is based on the value of service.[1] Related Terms electricity storage technologies, electricity generation, smart grid References ↑ SmartGrid.gov 'Description of Benefits' An in LikeLike UnlikeLike You like this.Sign Up to see what your friends like. line Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Reduced_Momentary_Outages&oldid=493094

62

Broadcast Outages for NIST Radio Station WWVB  

Science Conference Proceedings (OSTI)

... Broadcast Outages for WWVB. ... WWVB will be operating at 1/2 power (35 kW) during the daylight hours on weekdays from September 14, 2009 until ...

63

Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 25, 2007 May 25, 2007 Kevin Kolevar Director of the Office of Electricity Deliverability and Energy Reliability Department of Energy 1000 Independence Ave., SW Washington, DC 20585 Dear Mr. Kolevar, DOE has requested that Pepco provide an update on the current work to install two new 230 kilovolt circuits into Potomac River substation and to evaluate the need for generation from the Potomac River plant to support the anticipated line outage during June, 2007. An outage on one of the 230 kV circuits is currently underway and is currently scheduled to be completed by June 2, 2007. Mirant has supported this outage with generation required to match the Potomac River area load from the substation. This has required the operation of all 5 generating units located at

64

A framework and review of customer outage costs: Integration and analysis of electric utility outage cost surveys  

Science Conference Proceedings (OSTI)

A clear understanding of the monetary value that customers place on reliability and the factors that give rise to higher and lower values is an essential tool in determining investment in the grid. The recent National Transmission Grid Study recognizes the need for this information as one of growing importance for both public and private decision makers. In response, the U.S. Department of Energy has undertaken this study, as a first step toward addressing the current absence of consistent data needed to support better estimates of the economic value of electricity reliability. Twenty-four studies, conducted by eight electric utilities between 1989 and 2002 representing residential and commercial/industrial (small, medium and large) customer groups, were chosen for analysis. The studies cover virtually all of the Southeast, most of the western United States, including California, rural Washington and Oregon, and the Midwest south and east of Chicago. All variables were standardized to a consistent metric and dollar amounts were adjusted to the 2002 CPI. The data were then incorporated into a meta-database in which each outage scenario (e.g., the lost of electric service for one hour on a weekday summer afternoon) is treated as an independent case or record both to permit comparisons between outage characteristics and to increase the statistical power of analysis results. Unadjusted average outage costs and Tobit models that estimate customer damage functions are presented. The customer damage functions express customer outage costs for a given outage scenario and customer class as a function of location, time of day, consumption, and business type. One can use the damage functions to calculate outage costs for specific customer types. For example, using the customer damage functions, the cost experienced by an ''average'' customer resulting from a 1 hour summer afternoon outage is estimated to be approximately $3 for a residential customer, $1,200 for small-medium commercial and industrial customer, and $82,000 for large commercial and industrial customer. Future work to improve the quality and coverage of information on the value of electricity reliability to customers is described.

Lawton, Leora; Sullivan, Michael; Van Liere, Kent; Katz, Aaron; Eto, Joseph

2003-11-01T23:59:59.000Z

65

Track NERSC Scheduled and Unscheduled Outages in Google Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

Track NERSC Outages in Google Calendar Track NERSC Outages in Google Calendar March 22, 2013 by Jack Deslippe (0 Comments) Outages are now available in Google calendar form. You...

66

North American Electric Reliability Council Outage Announcement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Council Outage Announcement Council Outage Announcement North American Electric Reliability Council Outage Announcement Starting at about 4:11 p.m. EDT, major losses of electric load occurred in the northeastern United States and Canada in the Eastern Interconnection. Although the exact cause is not known at present, the outages are not the result of a terrorist attack. The areas most affected center around the Great Lakes: Michigan, Ohio, New York City, Ontario, Quebec, northern New Jersey, Massachusetts, and Connecticut. North American Electric Reliability Council Outage Announcement More Documents & Publications Blackout 2003: Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations Blackout 2003: Blackout Final Implementation Report

67

Managing turbine-generator outages by computer  

SciTech Connect

This article describes software being developed to address the need for computerized planning and documentation programs that can help manage outages. Downsized power-utility companies and the growing demand for independent, competitive engineering and maintenance services have created a need for a computer-assisted planning and technical-direction program for turbine-generator outages. To meet this need, a software tool is now under development that can run on a desktop or laptop personal computer to assist utility personnel and technical directors in outage planning. Total Outage Planning Software (TOPS), which runs on Windows, takes advantage of the mass data storage available with compact-disc technology by archiving the complete outage documentation on CD. Previous outage records can then be indexed, searched, and viewed on a computer with the click of a mouse. Critical-path schedules, parts lists, parts order tracking, work instructions and procedures, custom data sheets, and progress reports can be generated by computer on-site during an outage.

Reinhart, E.R. [Reinhart and Associates, Inc., Austin, TX (United States)

1997-09-01T23:59:59.000Z

68

Systems and Services Outage Notification Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

Job Logs & Analytics Job Logs & Analytics Training & Tutorials Software Accounts & Allocations Policies Acknowledge NERSC Allocation Eligibility Allocation Management Computer Security Computer Use Data Management Passwords Queue Scheduling Usage Charges System Outages Data Analytics & Visualization Data Management Policies Science Gateways User Surveys NERSC Users Group User Announcements Help Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov consult@nersc.gov 1-800-66-NERSC, option 3 or 510-486-8611 Home » For Users » Policies » System Outages Systems Outage Notification Policy To be considered a scheduled outage, the user community must be notified of

69

Evaluation of Suspected Steady-State Magnetic Induction by a 345-kV Double-Circuit Transmission Line onto Railroad Track  

Science Conference Proceedings (OSTI)

CenterPoint Energy operates a double circuit 345-kV transmission line north of Houston that parallels the Burlington Northern Santa Fe Railroad (BNSF) for approximately 15 miles. The railroad is experiencing elevated steady-state 60-Hz voltage in the parallel exposure. AC voltages and currents in railroad track can come from many sources. And, railroad systems can withstand reasonable amounts of this electromagnetic interference (EMI) without problems. When problems with EMI on a railroad do appear, it i...

2008-11-12T23:59:59.000Z

70

Outage Milestone Manual for Fossil-Fueled Power Plants  

Science Conference Proceedings (OSTI)

The efficiency of an outage program and the correctness of the outage process are important to the continuous improvement and long-term success of a utility and plant. This report--based on collective industry experience; Electric Power Research Institute (EPRI) publications; and outage conference, meeting, and workshop data--provides guidance for utility and plant management and staff involved in outage planning, execution, and post-outage operations and in restarting the planning cycle in preparation f...

2010-10-19T23:59:59.000Z

71

Outage Management Guidelines for Fossil- Fueled Power Plants  

Science Conference Proceedings (OSTI)

The efficiency of an outage program and the correctness of the outage process are important to the continuous improvement and the long-term success of a utility and plant. This report, based on collective industry experience, Electric Power Research Institute (EPRI) publications, and outage conference, meeting, and workshop data, provides guidance for utility/plant management and staff involved in outage planning, execution, and post-outage operations and in restarting the planning cycle in preparation f...

2006-12-22T23:59:59.000Z

72

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

73

Outage management and health physics issue, 2007  

SciTech Connect

The focus of the May-June issue is on outage management and health physics. Major articles/reports in this issue include: India: a potential commercial opportunity, a U.S. Department of Commerce Report, by Joe Neuhoff and Justin Rathke; The changing climate for nuclear energy, by Skip Bowman, Nuclear Energy Insitute; Selecting protective clothing, by J. Mark Price, Southern California Edison; and Succssful refurbishment outage, by Sudesh K. Gambhir, Omaha Public Power District. Industry innovation articles in this issue are: Containment radiation monitoring spiking, by Michael W. Lantz and Robert Routolo, Arizona Public Service Company; Improved outage performance, by Michael Powell and Troy Wilfong, Arizona Public Service Company, Palo Verde Nuclear Generating Station; Stop repacking valves and achieve leak-free performance, by Kenneth Hart, PPL Susquehanna LLC; and Head assembly upgrade package, by Timothy Petit, Dominion Nuclear.

Agnihotri, Newal (ed.)

2007-05-15T23:59:59.000Z

74

Outage managment and health physics issue, 2008  

SciTech Connect

The focus of the May-June issue is on outage management and health physics. Major articles include: Outage optimization initiatives, by George B. Beam, AREVA NP, Inc.; New plant based on excellent track records, by Jim Scarola, Progress Energy; Meeting customer needs and providing environmental benefits, by Peter S. Hastings, Duke Energy; Plants with 3-D design, by Jack A. Bailey, Tennessee Valley Authority; and Highest quality with exceptional planning, by Jason A. Walls, Duke Energy. Industry innovation articles include: Integrated exposure reduction plan, by Ed Wolfe, Exelon; Performance-based radiation worker training, by Joe Giuffre and Timothy Vriezerma, American Electric Power.

Agnihotri, Newal (ed.)

2008-05-15T23:59:59.000Z

75

Tracking Laser Coordinate Measurement System Application for Turbine Outage Activities  

Science Conference Proceedings (OSTI)

Tracking Laser Coordinate Measurement System Application for Turbine Outage Activities provides nuclear and fossil personnel with a faster and more accurate method for performing turbine measurement activities during an outage.

2007-12-21T23:59:59.000Z

76

Market Assessment of Refinery Outages Planned for October 2009 ...  

U.S. Energy Information Administration (EIA)

January fuel demand with availability of the refinery process units for distillate and gasoline production net of outages.

77

Fossil Power Plant Outage Scoping and Scope Control  

Science Conference Proceedings (OSTI)

This document provides detailed guidance for outage scope planning and control. It covers such topics as long-range business asset management tracking and inclusion into outage scope and contingency planning. It provides guidance on developing the outage plan, including typical criteria for the baseline budget, developing and using a monitoring plan and metrics, and developing an assessment plan for outage scope development and execution. The scope identification and approval processes are discussed as w...

2007-12-19T23:59:59.000Z

78

Indication of Potential Cascading Outages Using Measurement Data  

Science Conference Proceedings (OSTI)

Many efforts have been made to avoid blackouts in North America since 1965. However, cascading outages leading to catastrophic blackouts continued to happen. This project focused on investigating a comprehensive monitoring and control framework for prediction, analysis, and mitigation of cascading outages and conducting research on the early indication of potential cascading outages using real-time measurement data.

2010-12-21T23:59:59.000Z

79

A Preliminary Analysis of Network Outages During Hurricane Sandy  

E-Print Network (OSTI)

.2.3.*). To evaluate outages, we require that, historically, at least 10% of the addresses in the block reply to pingsA Preliminary Analysis of Network Outages During Hurricane Sandy USC/ISI Technical Report ISI, linquan, yuri}@isi.edu ABSTRACT This document describes our analysis of Internet outages during

Heidemann, John

80

The detection, prevention and mitigation of cascading outages in the power system  

E-Print Network (OSTI)

This dissertation studies the causes and mechanism of power system cascading outages and develops new methods and new tools to help detect, prevent and mitigate the outages. Three effective solutions: a steady state control scheme, a transient stability control scheme, and an interactive system-wide and local scheme have been proposed using those new methods and tools. A steady state control scheme can help detect and prevent the possible cascading outage at its initial slow steady state progress stage. It uses new methods and new tools to solve the line overload, congestion or bus high/low voltage problems. New methods, such as vulnerability index (VI), margin index (MI), network contribution factor (NCF), topology processing and selected minimum load shedding (SMLS), and new tools, such as transmission network control based on a network contribution factor (NCF) method, generator control based on a generator distribution factor (GDF) method, and load control based on a load distribution factor (LDF) method have been proposed and developed. A transient stability control scheme can help prevent and mitigate the possible cascading outage at its transient progress stage if there is enough time to take action. It uses one Lyapunov direct method, potential energy boundary surface (PEBS) method, and sensitivity analysis of transient energy margin for fast stabilizing control. The results are verified by the accurate time-domain transient stability analysis method. The interactive scheme takes advantage of accurate system-wide and local information and analysis results, uses some techniques from both steady state control and transient stability control, works at both the system-wide level and local substation level, monitors the system all the time, and takes actions when needed to help detect, prevent and mitigate the possible cascading outage. Comprehensive simulation studies have been implemented using the IEEE 14- bus, 24-bus, 39-bus and 118-bus systems and promising results show the ability of the proposed solutions to help detect, prevent and mitigate cascading outages.

Song, Hongbiao

2006-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Reliability and Cost-Benefit-Based Standards for Transmission Network Operation and Design  

E-Print Network (OSTI)

...................................................................................................................... 143 Table C.3: Breakdown of transmission costs during t3 when considering all outages to single outages N-2 Deterministic security policy that refers to double outages O Operational cost #12. Probabilistic cost-benefit framework considered to replace historical deterministic N-k criteria. No changes

Catholic University of Chile (Universidad Católica de Chile)

82

Microsoft Word - 112706 Final Outage Letter PUBLIC.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CRITICAL ENERGY INFRASTRUCTURE INFORMATION CRITICAL ENERGY INFRASTRUCTURE INFORMATION REMOVED FOR PRIVILEGED TREATMENT November 27, 2006 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Generating Station Department of Energy Case No. EO-05-01 Dear Mr. Mansueti: Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission outages that are scheduled for the upcoming months. In accordance with its internal procedures developed pursuant to the December 20, 2005 order in the captioned proceeding, Order No. 202-05-03 ("December 20 Order"), Pepco will provide

83

Maintain HCUs on-line, shorten refueling outages  

SciTech Connect

This article examines how removing maintenance of hydraulic control units from the outage scope lets the outage focus available resources on critical-path items, saving significant time and money and enhancing capacity factors. Because of their cost impact, refueling outages are a prime focus of efforts to improve the competitive operation of nuclear powerplants. An approach drawing wide interest is reducing the outage work scope by performing on-line key tasks normally consigned to refueling outages. applying this approach to maintenance of hydraulic control units (HCUs) on boiling-water reactors (BWRs) can be extremely fruitful.

Bell, T.

1996-09-01T23:59:59.000Z

84

Outage management and health physics issue, 2006  

SciTech Connect

The focus of the May-June issue is on outage management and health physics. Major articles/reports in this issue include: A design with experience for the U.S., by Michael J. Wallace, Constellation Generation Group; Hope to be among the first, by Randy Hutchinson, Entergy Nuclear; Plans to file COLs in 2008, by Garry Miller, Progress Energy; Evolution of ICRP's recommendations, by Lars-Erik Holm, ICRP; European network on education and training in radiological protection, by Michele Coeck, SCK-CEN, Belgium; Outage managment: an important tool for improving nuclear power plant performance, by Thomas Mazour and Jiri Mandula, IAEA, Austria; and Plant profile: Exploring new paths to excellence, by Anne Thomas, Exelon Nuclear.

Agnihotri, Newal (ed.)

2006-05-15T23:59:59.000Z

85

RESOLVED: Projectb filesystem outage July 9, 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

RESOLVED: Projectb filesystem outage July 9, 2012 RESOLVED: Projectb filesystem outage July 9, 2012 RESOLVED: Projectb filesystem outage July 9, 2012 July 9, 2012 (0 Comments) The projectb filesystem had a hardware failure that potentially generated I/O errors. The filesystem logs indicate that the earliest abnormal event on the filesystem occurred at 9:19AM and the filesystem was taken down for maintenance at 10:42AM. The filesystem returned to service at 11:20AM. Jobs running on the cluster would not have been able to read from or write to the projectb filesystem between 10:42AM and 11:20AM. Between 9:19AM and 10:42AM one out of the 20 GPFS controllers on projectb was down, and didn't failover (as it should have). This means: 1/20 file I/O operations could have failed between 9:19AM and 10:42AM If your job was performing a large number of short reads and writes, then

86

Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities  

Science Conference Proceedings (OSTI)

The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.

Gregory Weatherby

2012-05-01T23:59:59.000Z

87

744 IEEE JOURNAL OF SOLID-STATE CIRCUITS, VOL. 40, NO. 3, MARCH 2005 Nonlinear Transmission Lines  

E-Print Network (OSTI)

of the electric field transmission characteristic corresponding to the single-row waveguiding defect is linear-calculated and measured results for the insertion loss of the 10-cm-long FR4 double-row defect shown in Fig. 3. A standard) computational studies scaled to a 10 GHz center frequency of single-row and double-row waveguiding defects

Hajimiri, Ali

88

Summary of Market Assessment of Upcoming Planned Refinery Outages  

Gasoline and Diesel Fuel Update (EIA)

Summary of Market Assessment of Upcoming Planned Refinery Outages Summary of Market Assessment of Upcoming Planned Refinery Outages Summary of Market Assessment of Upcoming Planned Refinery Outages Market Assessment of Upcoming Planned Refinery Outages, December 2008 - March 2009 reviews planned U.S. refinery outages from December 2008 though March 2009 in order to identify any regions where outages might create enough supply pressure to impact prices significantly. As required under Section 804 of the Energy Independence and Security Act of 2007 (Pub. L. 110-140), this report reviews the supply implications of planned refinery outages for December 2008 through March 2009, which covers the winter period when demand for distillate fuels (diesel and heating oil) is high. As a result, emphasis in this report is on distillate rather than gasoline. Refinery outages are the result of planned maintenance and unplanned outages. Maintenance is usually scheduled during the times when demand is lowest - in the first quarter and again in the fall. Unplanned outages, which occur for many reasons including mechanical failures, fires, and flooding, can occur at any time.

89

Application of Standard Maintenance Windows in PHWR Outage  

SciTech Connect

The concept of Standard Maintenance Windows has been widely used in the planned outage of light water reactor in the world. However, due to the specific feature of Pressurized Heavy Water Reactor (PHWR), it has not come to a consensus for the PHWR owners to adopt Standard Maintenance Windows for planned outage aiming at the optimization of outage duration. Third Qinshan Nuclear Power Company (TQNPC), with their experience gained in the previous outages and with reference to other PHWR power plants, has identified a set of Standard Maintenance Windows for planned outage. It can be applied to similar PHWR plants and with a few windows that are specific to Qinshan Phase III NPP. The use of these Standard Maintenance Windows in planned outage has been proved to be effective in control shutdown nuclear safety, minimize the unavailability of safety system, improve the efficient utilization of outage duration, and improved the flexibility of outage schedule in the case of emergency issue, which forced the revision of outage schedule. It has also formed a solid foundation for benchmarking. The identification of Standard Maintenance Windows and its application will be discussed with relevant cases for the common improvement of outage duration. (author)

Fuming Jiang [Third Qinshan Nuclear Power Company, Ltd. (China)

2006-07-01T23:59:59.000Z

90

Definition: Outage Detection/Reporting | Open Energy Information  

Open Energy Info (EERE)

Outage Detection/Reporting Outage Detection/Reporting Jump to: navigation, search Dictionary.png Outage Detection/Reporting A system utilizing smart meters and AMI that can notify a utility of customer power outages when the power to meters is interrupted. Generally speaking, this can be done by utilizing meters that can send a "last gasp" signal to the head-end system upon losing power, or by periodically polling meters to check status.[1] Related Terms power, advanced metering infrastructure, system References ↑ https://www.smartgrid.gov/category/technology/outage_detectionreporting [[Cat Like Like You like this.Sign Up to see what your friends like. egory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Outage_Detection/Reporting&oldid=502576

91

Transmission Line Surge Arrester - White Paper  

Science Conference Proceedings (OSTI)

Electricity customers are continually demanding improved transmission system reliability and performance. In order to improve reliability, utilities must focus on mitigating the effects of lightning, which is often the most frequent cause of transmission outages and service interruptions. The widespread use of electronic equipment at home and at work makes the challenge of providing reliable electrical service greater today than ever before. Customers can be adversely affected by even momentary outages o...

2005-07-27T23:59:59.000Z

92

Plant maintenance and outage management issue, 2005  

SciTech Connect

The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

Agnihotri, Newal (ed.)

2005-01-15T23:59:59.000Z

93

Nuclear outages back within typical range since July following ...  

U.S. Energy Information Administration (EIA)

U.S. nuclear generator outages were above the levels of the previous four years in the second quarter of 2011 but have returned to more typical ...

94

Nuclear outages begin to increase with the start of the ...  

U.S. Energy Information Administration (EIA)

Short-Term Energy Outlook ... Search EIA.gov. A-Z Index; ... several units began to reduce their output to enter into refueling outages, ...

95

Market Assessment of Refinery Outages Planned for October 2010 ...  

U.S. Energy Information Administration (EIA)

distillation and FCC unit outages are projected to be at typical to above typical levels in the second half of 2010, with some months significantly above average in ...

96

Market Assessment of Refinery Outages Planned for March 2010 ...  

U.S. Energy Information Administration (EIA)

DOE/EIA-0641(2010)/1 Market Assessment of Refinery Outages Planned for March 2010 through June 2010 March 2010 Energy Information Administration

97

New tensioning equipment saves critical path time in nuclear outage  

SciTech Connect

This article examines the selection and application of new tensioning equipment for TVA`s Browns Ferry Nuclear Plant. The new device would reduce refueling outage time and radiation exposure, and require fewer personnel to operate. Results of the equipment performance during the refueling outage and problems encountered and resolved are described.

NONE

1995-10-01T23:59:59.000Z

98

Remote reset circuit  

SciTech Connect

A remote reset circuit acts as a stand-alone monitor and controller by clocking in each character sent by a terminal to a computer and comparing it to a given reference character. When a match occurs, the remote reset circuit activates the system's hardware reset line. The remote reset circuit is hardware based centered around monostable multivibrators and is unaffected by system crashes, partial serial transmissions, or power supply transients.

Gritzo, Russell E. (West Melbourne, FL)

1987-01-01T23:59:59.000Z

99

Remote reset circuit  

DOE Patents (OSTI)

A remote reset circuit acts as a stand-along monitor and controller by clocking in each character sent by a terminal to a computer and comparing it to a given reference character. When a match occurs, the remote reset circuit activates the system's hardware reset line. The remote reset circuit is hardware based centered around monostable multivibrators and is unaffected by system crashes, partial serial transmissions, or power supply transients. 4 figs.

Gritzo, R.E.

1985-09-12T23:59:59.000Z

100

A stochastic model for the measurement of electricity outage costs  

SciTech Connect

The measurement of customer outage costs has recently become an important subject of research for electric utilities. This paper uses a stochastic dynamic model as the starting point in developing a market-based method for the evaluation of outage costs. Specifically, the model postulates that once an electricity outage occurs, all production activity stops. Full production is resumed once the electricity outage is over. This process repeats itself indefinitely. The business customer maximizes his expected discounted profits (the expected value of the firm), taking into account his limited ability to respond to repeated random electricity outages. The model is applied to 11 industrial branches in Israel. The estimates exhibit a large variation across branches. 34 refs., 3 tabs.

Grosfeld-Nir, A.; Tishler, A. (Tel Aviv Univ. (Israel))

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

U.S. - Canada Power System Outage Task Force: Final Report on...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations U.S. - Canada Power System Outage Task Force: Final Report on the...

102

Technology Integration Initiative In Support of Outage Management  

SciTech Connect

Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Often, command and control during outages is maintained in the outage control center where many of the underlying technologies supporting outage control are the same as those used in the 1980’s. This research reports on the use of advanced integrating software technologies and hand held mobile devices as a means by which to reduce cycle time, improve accuracy, and enhance transparency among outage team members. This paper reports on the first phase of research supported by the DOE Light Water Reactor Sustainability (LWRS) Program that is performed in close collaboration with industry to examine the introduction of newly available technology allowing for safe and efficient outage performance. It is thought that this research will result in: improved resource management among various plant stakeholder groups, reduced paper work, and enhanced overall situation awareness for the outage control center management team. A description of field data collection methods, including personnel interview data, success factors, end-user evaluation and integration of hand held devices in achieving an integrated design are also evaluated. Finally, the necessity of obtaining operations cooperation support in field studies and technology evaluation is acknowledged.

Gregory Weatherby; David Gertman

2012-07-01T23:59:59.000Z

103

Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line, June 15, 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 Federal Register / Vol. 64, No. 114 / Tuesday, June 15, 1999 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/ Olinda-Elverta 230-Kilovolt Double- Circuit Transmission Line AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. In response to this request, Western completed an Interconnection Feasibility Study that determined that

104

Economic Benefits of Increasing Electric Grid Resilience to Weather Outages  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Economic Benefits of Increasing Electric Grid Resilience to Weather Economic Benefits of Increasing Electric Grid Resilience to Weather Outages Economic Benefits of Increasing Electric Grid Resilience to Weather Outages In June 2011, President Obama released A Policy Framework for the 21st Century Grid which set out a four-pillared strategy for modernizing the electric grid. The initiative directed billions of dollars toward investments in 21st century smart grid technologies focused at increasing the grid's efficiency, reliability, and resilience, and making it less vulnerable to weather-related outages and reducing the time it takes to restore power after an outage occurs. Grid resilience is increasingly important as climate change increases the frequency and intensity of severe weather. Greenhouse gas emissions are elevating air and water temperatures around the world. Scientific research

105

A statistical model for risk management of electric outage forecasts  

Science Conference Proceedings (OSTI)

Risk management of power outages caused by severe weather events, such as hurricanes, tornadoes, and thunderstorms, plays an important role in electric utility distribution operations. Damage prediction based on weather forecasts on an appropriate spatial ...

H. Li; L. A. Treinish; J. R. M. Hosking

2010-05-01T23:59:59.000Z

106

Abstract--Integration of asset management and outage management tasks for distribution system is proposed and  

E-Print Network (OSTI)

and evaluation of the influence of optimization on the cost of system outage is elaborated. Potential benefit as the maximum tolerable value. #12;7 V. OPTIMIZED OUTAGE COST THROUGH RISK-BASED ASSESSMENT 1. Optimized outage cost through risk-based assessment Risk-based analysis is used to estimate outage cost in this paper

Kezunovic, Mladen

107

Development of Methodologies for Technology Deployment for Advanced Outage Control Centers that Improve Outage Coordination, Problem Resolution and Outage Risk Management  

SciTech Connect

This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The long term viability of existing nuclear power plants in the U.S. will depend upon maintaining high capacity factors, avoiding nuclear safety issues and reducing operating costs. The slow progress in the construction on new nuclear power plants has placed in increased importance on maintaining the output of the current fleet of nuclear power plants. Recently expanded natural gas production has placed increased economic pressure on nuclear power plants due to lower cost competition. Until recently, power uprate projects had steadily increased the total output of the U.S. nuclear fleet. Errors made during power plant upgrade projects have now removed three nuclear power plants from the U.S. fleet and economic considerations have caused the permanent shutdown of a fourth plant. Additionally, several utilities have cancelled power uprate projects citing economic concerns. For the past several years net electrical generation from U.S. nuclear power plants has been declining. One of few remaining areas where significant improvements in plant capacity factors can be made is in minimizing the duration of refueling outages. Managing nuclear power plant outages is a complex and difficult task. Due to the large number of complex tasks and the uncertainty that accompanies them, outage durations routinely exceed the planned duration. The ability to complete an outage on or near schedule depends upon the performance of the outage management organization. During an outage, the outage control center (OCC) is the temporary command center for outage managers and provides several critical functions for the successful execution of the outage schedule. Essentially, the OCC functions to facilitate information inflow, assist outage management in processing information and to facilitate the dissemination of information to stakeholders. Currently, outage management activities primarily rely on telephone communication, face to face reports of status and periodic briefings in the OCC. Much of the information displayed in OCCs is static and out of date requiring an evaluation to determine if it is still valid. Several advanced communication and collaboration technologies have shown promise for facilitating the information flow into, across and out of the OCC. Additionally, advances in the areas of mobile worker technologies, computer based procedures and electronic work packages can be leveraged to improve the availability of real time status to outage managers.

Shawn St. Germain; Ronald Farris; Heather Medeman

2013-09-01T23:59:59.000Z

108

Guide for the Application of Transmission Line Surge Arrestors  

Science Conference Proceedings (OSTI)

Lightning flashovers are the most frequent cause of transmission line outages, resulting in a direct cost to utilities of more than $1 billion per year in damaged or destroyed equipment. There are also substantial indirect costs involved due to the reduction in power quality caused by frequent lightning outages. The lightning performance of transmission lines is usually improved by installing overhead ground or shield wires or by increasing the tower footing resistance; however, in some cases, these meas...

2009-12-21T23:59:59.000Z

109

Measuring circuit  

DOE Patents (OSTI)

An automatic gain control circuit functions to adjust the magnitude of an input signal supplied to a measuring circuit to a level within the dynamic range of the measuring circuit while a log-ratio circuit adjusts the magnitude of the output signal from the measuring circuit to the level of the input signal and optimizes the signal-to-noise ratio performance of the measuring circuit.

Sun, Shan C. (Pittsburgh, PA); Chaprnka, Anthony G. (Cockeysville, MD)

1977-01-11T23:59:59.000Z

110

Fast Detection and Mitigation of Cascading Outages in the Power System  

E-Print Network (OSTI)

This dissertation studies the causes and mechanism of power system cascading outages and proposes the improved interactive scheme between system-wide and local levels of monitoring and control to quickly detect, classify and mitigate the cascading outages in power system. A novel method for evaluating the vulnerability of individual components as well as the whole power system, which is named as weighted vulnerability analysis, is developed. Betweenness centrality is used to measure the importance of each bus and transmission line in the modeled power system network, which is in turn used to determine the weights for the weighted vulnerability index. It features fast reaction time and achieves higher accuracy when dealing with the cascading outage detection, classification and mitigation over the traditional methods. The overload problem due to power flow redistribution after one line tripped is a critical factor contributing to the cascading outages. A parallel corridor searching method is proposed to quickly identify the most vulnerable components after tripping a transmission line. The power system topology model can be simplified into state graph after searching the domains for each generator, the commons for each bus, and links between the commons. The parallel corridor will be determined by searching the links and commons in system topology graph for the given state of power system operation. During stressed operating state, either stable or unstable power swing may have impacts on distance relay judgment and lead to relay misoperation, which will result in the power system lines being tripped and as a consequence power system operating state becoming even more stressful. At the local level, an enhanced fault detection tool during power system swing is developed to reduce the chance of relay misoperation. Comprehensive simulation studies have been implemented by using the IEEE 39-bus and 118-bus test systems. The results are promising because: The results from weighted vulnerability analysis could provide better system situational awareness and accurate information about the disturbance; The results form parallel corridor search method could identify the most vulnerable lines after power re-distribution, which will give operator time to take remedial actions; The results from new travelling wave and wavelet transform based fault detection could reduce the impact of relay misoperation.

Pang, Chengzong

2011-12-01T23:59:59.000Z

111

Overview of Common Mode Outages in Power Systems  

SciTech Connect

This paper is a result of ongoing activity carried out by Probability Applications for Common Mode Events (PACME) Task Force under the Reliability Risk and Probability Applications (RRPA) Subcommittee. The paper is intended to constitute a valid source of information and references about dealing with common-mode outages in power systems reliability analysis. This effort involves reviewing published literature and presenting state-of-the-art research and practical applications in the area of common-mode outages. Evaluation of available outage statistics show that there is a definite need for collective effort from academia and industry to not only recommended procedures for data collection and monitoring but also to provide appropriate mathematical models to assess such events.

Papic, Milorad; Awodele , Kehinde; Billinton, Roy; Dent, Chris; Eager, Dan; Hamoud, Gomaa; Jirutitijaroen, Panida; Kumbale, Murali; Mitra, Joydeep; Samaan, Nader A.; Schneider, Alex; Singh, Chanan

2012-11-10T23:59:59.000Z

112

Lassoing Line Outages in the Smart Power Grid  

E-Print Network (OSTI)

Fast and accurate unveiling of power line outages is of paramount importance not only for preventing faults that may lead to blackouts, but also for routine monitoring and control tasks of the smart grid, including state estimation and optimal power flow. Existing approaches are either challenged by the \\emph{combinatorial complexity} issues involved, and are thus limited to identifying single- and double-line outages; or, they invoke less pragmatic assumptions such as \\emph{conditionally independent} phasor angle measurements available across the grid. Using only a subset of voltage phasor angle data, the present paper develops a near real-time algorithm for identifying multiple line outages at the affordable complexity of solving a quadratic program via block coordinate descent iterations. The novel approach relies on reformulating the DC linear power flow model as a \\emph{sparse} overcomplete expansion, and leveraging contemporary advances in compressive sampling and variable selection using the least-abso...

Zhu, Hao

2011-01-01T23:59:59.000Z

113

Importance, Identification, and Assessment of Danger and Hazard Trees Located Outside Electric Transmission Line Rights-of-Way  

Science Conference Proceedings (OSTI)

Electric transmission line rights-of-way (ROWs) commonly pass through forested areas across North America. Trees from these forests could fall from outside the ROW into a transmission line and its security zone, potentially causing an outage. Most of the bulk transmission outages across the United States over the past decade have been caused by off-ROW trees. The North American Electric Reliability Corporation (NERC) developed standards for transmission vegetation management programs that strictly regul...

2010-11-22T23:59:59.000Z

114

A Review of Power Outages and Restoration Following the June 2012 Derecho  

Energy.gov (U.S. Department of Energy (DOE))

This report reviews power outages and restoration efforts following the June 29, 2012 Derecho and compares them to outages and restoration efforts following other spring and summer storms in the...

115

Notification of Planned 230kV Outage at Potomac River Generating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to provide notification of any and all 230kV planned and unplanned outages at Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating...

116

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

cable transmission systems:5 two 500 kV circuits, a high-voltage direct current (HVDC) system and two to serve VI and the HVDC link is expected to be completely retired in 2007. This erosion in transmission / replacement of the HVDC cables (at a cost of $230 million), as well as transmission upgrades on the mainland

117

Mitigation of Animal-Caused Outages For Distribution Lines and Substations  

Science Conference Proceedings (OSTI)

A significant number of electric outages throughout North America are caused by animals -- mammals, birds, snakes, etc. These animal-caused outages are increasingly common in both urban and residential areas. By taking a pro-active approach to mitigating outages, utilities will spare the lives of wildlife and address the increasing pressures from environmental groups and concerned utility customers. This document describes a study designed to mitigate animal-caused outages for distribution lines and subs...

1999-12-20T23:59:59.000Z

118

96 IEEE power & energy magazine march/april 2005 THE MASSIVE POWER OUTAGE OF  

E-Print Network (OSTI)

of power outages. These devices, which came into play during last year's blackout, typically perform for more outages and the increased cost of out- ages at the consumer level. We can-- and must96 IEEE power & energy magazine march/april 2005 T THE MASSIVE POWER OUTAGE OF August 2003

Amin, S. Massoud

119

A Framework and Review of Customer Outage Costs: Integration and Analysis of  

E-Print Network (OSTI)

by Region, Season, Day of Week, and Year 36 Table 5-2. Average Outage Costs by Duration 36 Table 5, if a calculation of the average outage cost for a given year is calculated it would be heavily influenced and Day of Week and Year of Study This problem surfaces for many of the calculations of outage costs

120

Environmental determinants of unscheduled residential outages in the electrical power distribution of Phoenix, Arizona  

E-Print Network (OSTI)

problem. We model electric interruptions using outage data between the years of 2002 and 2005 across, and interactions between the two. We model electric interruptions using outage data for the years 2002;22:117­21. [14] Fritts TH. Economic costs of electrical system instability and power outages caused by snakes

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Nuclear Maintenance Applications Center: Effective Refueling Outage Preparation and Execution Guidance--Revision to 1014480  

Science Conference Proceedings (OSTI)

This report provides updated, current guidance to assist outage managers and teams during preparation and execution phases of a nuclear refueling outage. Included is guidance on how the outage activities support long-range and strategic plans developed by the site or fleet of units.

2011-12-13T23:59:59.000Z

122

A framework and review of customer outage costs: Integration and analysis of electric utility outage cost surveys  

E-Print Network (OSTI)

Std Dev Cost Per Annual Cost Per kWh Usage Peak kW AverageStd Dev Cost Per Annual Cost Per kWh Usage Peak kW Average3-2. Logged Outage Cost per Annual kWh Figure 3-3. Logged

Lawton, Leora; Sullivan, Michael; Van Liere, Kent; Katz, Aaron; Eto, Joseph

2003-01-01T23:59:59.000Z

123

Power System Transmission Protection: Proposed R&D Projects  

Science Conference Proceedings (OSTI)

The U.S.-Canada task force on the August 14, 2003 power system outage that affected 50 million people concluded that inappropriate and uncoordinated relay protection settings were one of the three principal reasons that the cascade outage spread beyond Ohio and caused the widespread blackout. Based on input from utilities and other stakeholders at a recent protection workshop, this report proposes four R&D project to help meet needs in the transmission protection area.

2005-09-14T23:59:59.000Z

124

ADDER CIRCUIT  

DOE Patents (OSTI)

An improved parallel addition unit is described which is especially adapted for use in electronic digital computers and characterized by propagation of the carry signal through each of a plurality of denominationally ordered stages within a minimum time interval. In its broadest aspects, the invention incorporates a fast multistage parallel digital adder including a plurality of adder circuits, carry-propagation circuit means in all but the most significant digit stage, means for conditioning each carry-propagation circuit during the time period in which information is placed into the adder circuits, and means coupling carry-generation portions of thc adder circuit to the carry propagating means.

Jacobsohn, D.H.; Merrill, L.C.

1959-01-20T23:59:59.000Z

125

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

126

www.eia.gov  

U.S. Energy Information Administration (EIA)

Existing Transmission Capacity by High-Voltage Size ... Transmission Availability 4.7.A. U.S. Transmission Circuit Automatic Outage Counts by Cause Code and by NERC ...

127

Concrete Foundations in Substations and Transmission Lines  

Science Conference Proceedings (OSTI)

This report presents the results of surveys conducted to obtain information on the degradation of concrete foundations that support transmission towers and high-voltage substation equipment. Although concrete foundations are simple and inexpensive, their degradation or failure may have costly consequences, including potential equipment damage and the need for outages to allow movement of critical equipment so the ...

2012-12-14T23:59:59.000Z

128

HPSS Outage Tue Mar 19 - Fri Mar 22  

NLE Websites -- All DOE Office Websites (Extended Search)

HPSS HPSS Outage Tue Mar 19 - Fri Mar 22 HPSS Outage Tue Mar 19 - Fri Mar 22 March 12, 2013 by Francesca Verdier (0 Comments) The NERSC HPSS "User" system (archive.nersc.gov) will be down for four days from Tue Mar 19 07:00 to Fri Mar 22 17:00). The system will be upgraded from HPSS version 6.2 to version 7.3. This new version of the HPSS server software is not compatible with current GridFTP servers. This means the NERSC HPSS systems will not support any grid-based transfer methods (including GlobusOnline) following the upgrade. We expect to install a fix for this problem during a scheduled downtime by the end of April. This is a major upgrade that will require users of the HPSS User system to switch to new versions of the HPSS client software tools hsi and htar.

129

Model validation for the August 10, 1996 WSCC system outage  

SciTech Connect

A major power outage occurred in western North America on August 10, 1996. In this paper the authors describe simulation of the disturbance using a transient stability program. Initially, the sequence of events was simulated using the standard WSCC dynamic data base, and the simulations did not agree with the disturbance recordings. Several model additions and data modifications were made before the simulations approximated the disturbance recordings. These model changes are discussed in the paper.

Kosterev, D.N.; Taylor, C.W.; Mittelstadt, W.A. [Bonneville Power Administration, Portland, OR (United States). Transmission Operations and Planning

1999-08-01T23:59:59.000Z

130

Common Information Model Meter Outage Nominal Interoperability Test Procedure  

Science Conference Proceedings (OSTI)

The CIM Meter Outage Nominal Interoperability Test Procedure is one in a series of EPRI CIM Interoperability Test Procedures (ETIPs) created by EPRI whose purpose is to thoroughly document the actors, interfaces, and test steps for the interoperability testing of specific parts of the International Electrotechnical Commission (IEC) Common Information Model (CIM) standard. The Test Procedures are initially being used for EPRI demonstration tests and are intended, over time, to form the basis of a set of C...

2011-12-16T23:59:59.000Z

131

Outline of Guide for Application of Transmission Line Surge Arresters 42 to 765 kV  

Science Conference Proceedings (OSTI)

Lightning flashovers are the most frequent cause of transmission line outages. Transmission line surge arresters (TLSA) limit lightning overvoltages between phase conductors and towers, and thus eliminate most outages on protected structures. This guide provides a tutorial on the relevant lightning phenomena, with an in-depth look at the operation, application, and placement of TLSA to maximize flashover protection and minimize capital investment. The guide also describes ways to improve tower grounding ...

2006-10-29T23:59:59.000Z

132

Monitoring transients in low inductance circuits  

DOE Patents (OSTI)

The instant invention relates to methods of and apparatus for monitoring transients in low inductance circuits and to a probe utilized to practice said method and apparatus. More particularly, the instant invention relates to methods of and apparatus for monitoring low inductance circuits, wherein the low inductance circuits include a pair of flat cable transmission lines. The instant invention is further directed to a probe for use in monitoring pairs of flat cable transmission lines.

Guilford, R.P.; Rosborough, J.R.

1985-10-21T23:59:59.000Z

133

Multipurpose Outage at a Midsize, Resource-Limited Nonpower Reactor  

SciTech Connect

The University of Florida Training Reactor (UFTR) is a light water-cooled, graphite and light water-moderated, modified Argonaut-type reactor licensed to operate at steady-state power levels up to 100 kW. The UFTR was subject to a unique and lengthy voluntary outage beginning in May 1998 following several months of gradual increases in the normal critical position totaling {approx}0.002 {Delta}k/k. The Nuclear Regulatory Commission (NRC) was updated periodically on the facility status and visited the facility twice during the outage and once since restart to normal operations on August 17, 1999. Various potential causes of this reactivity anomaly were identified. After investigation, each of these causes was eliminated with no specific cause ever identified. Despite all the inherent limitations and especially because of the difficulty of core access, this entire outage was conducted with the perspective of relicensing in 2002. Areas specifically addressed included compensating efforts to preclude loss of user clientele, acquisition of data for facilitating the upcoming conversion from high-enriched uranium (HEU) to low-enriched uranium (LEU), and development of a surveillance plan relicensing database to support the planned license renewal. In summary, this nonpower reactor facility with limited staff has been successful in all three areas.

William G. Vernetson

2000-06-04T23:59:59.000Z

134

Risk Assessment of Cascading Outages: Methodologies and Challenges  

Science Conference Proceedings (OSTI)

Abstract- This paper is a result of ongoing activity carried out by Understanding, Prediction, Mitigation and Restoration of Cascading Failures Task Force under IEEE Computer Analytical Methods Subcommittee (CAMS). The task force's previous papers are focused on general aspects of cascading outages such as understanding, prediction, prevention and restoration from cascading failures. This is the first of two new papers, which extend this previous work to summarize the state of the art in cascading failure risk analysis methodologies and modeling tools. This paper is intended to be a reference document to summarize the state of the art in the methodologies for performing risk assessment of cascading outages caused by some initiating event(s). A risk assessment should cover the entire potential chain of cascades starting with the initiating event(s) and ending with some final condition(s). However, this is a difficult task and heuristic approaches and approximations have been suggested. This paper discusses different approaches to this and suggests directions for future development of methodologies. The second paper summarizes the state of the art in modeling tools for risk assessment of cascading outages.

Vaiman, Marianna; Bell, Keith; Chen, Yousu; Chowdhury, Badrul; Dobson, Ian; Hines, Paul; Papic, Milorad; Miller, Stephen; Zhang, Pei

2012-05-31T23:59:59.000Z

135

Abstract--Cascading outages can cause large blackouts, and a variety of methods are emerging to study this challenging topic.  

E-Print Network (OSTI)

1 Abstract-- Cascading outages can cause large blackouts, and a variety of methods are emerging Analysis, Risk Analysis, Preventing Cascades. I. INTRODUCTION A cascading outage is a sequence of events component outages (based on [1] and [2]). In some cases cascading outages halt before the sequence results

Hines, Paul

136

Overhead Transmission Line Lightning and Grounding Reference Book 2012  

Science Conference Proceedings (OSTI)

In North America and many other parts of the world, lightning remains the primary cause of transmission line outages, momentary interruptions, and reliability and maintenance problems. The lightning performance of transmission lines may be improved by applying overhead ground wires, providing a low impedance connection to ground, and selecting appropriate insulation levels for the phase conductors. The success of these measures is not always ...

2012-12-12T23:59:59.000Z

137

Photoconductive circuit element reflectometer  

DOE Patents (OSTI)

A photoconductive reflectometer for characterizing semiconductor devices at millimeter wavelength frequencies where a first photoconductive circuit element (PCE) is biased by a direct current voltage source and produces short electrical pulses when excited into conductance by short first laser light pulses. The electrical pulses are electronically conditioned to improve the frequency related amplitude characteristics of the pulses which thereafter propagate along a transmission line to a device under test. Second PCEs are connected along the transmission line to sample the signals on the transmission line when excited into conductance by short second laser light pulses, spaced apart in time a variable period from the first laser light pulses. Electronic filters connected to each of the second PCEs act as low-pass filters and remove parasitic interference from the sampled signals and output the sampled signals in the form of slowed-motion images of the signals on the transmission line.

Rauscher, Christen (Alexandria, VA)

1990-01-01T23:59:59.000Z

138

Study, outlines why outages go long, short, or on-time  

SciTech Connect

A recent report by a nuclear industry professional, based on a survey of outage managers at US nuclear power plants, declares that [open quotes]preplanned outage schedules appear to be grossly inaccurate, and the outage management planners and schedulers do not have a grasp of the requirements and/or the resources needed to complete the actual activities on schedule.[close quotes] It declares that [open quotes]the scheduled duration of a planned outage must be realistic.[close quotes] The study identifies personnel, planning and scheduling, and equipment/hardware as [open quotes]the primary reasons why refueling outages and outage activities finished ahead of, right on, or behind schedule.[close quotes

Not Available

1993-09-01T23:59:59.000Z

139

Outage Closeout and Unit Restart Guidelines for Fossil-Fueled Power Plants  

Science Conference Proceedings (OSTI)

Outage closeout planning and execution and successful restart are as important as the efforts going into an outage. Detailed planning and execution are required to ensure that schedules are met, tests are completed in a timely fashion, training is completed, and that lessons learned are captured for use in future outages, both planned and forced. Effective closure and restart activities result in a smoother return to service and more reliable operation. This project is based upon collective industry expe...

2008-12-22T23:59:59.000Z

140

MULTIPLIER CIRCUIT  

DOE Patents (OSTI)

An electronic circuit is presented for automatically computing the product of two selected variables by multiplying the voltage pulses proportional to the variables. The multiplier circuit has a plurality of parallel resistors of predetermined values connected through separate gate circults between a first input and the output terminal. One voltage pulse is applied to thc flrst input while the second voltage pulse is applied to control circuitry for the respective gate circuits. Thc magnitude of the second voltage pulse selects the resistors upon which the first voltage pulse is imprcssed, whereby the resultant output voltage is proportional to the product of the input voltage pulses

Thomas, R.E.

1959-01-20T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

GATING CIRCUITS  

DOE Patents (OSTI)

Control circuits for vacuum tubes are described, and a binary counter having an improved trigger circuit is reported. The salient feature of the binary counter is the application of the input signal to the cathode of each of two vacuum tubes through separate capacitors and the connection of each cathode to ground through separate diodes. The control of the binary counter is achieved in this manner without special pulse shaping of the input signal. A further advantage of the circuit is the simplicity and minimum nuruber of components required, making its use particularly desirable in computer machines.

Merrill, L.C.

1958-10-14T23:59:59.000Z

142

A Study of Outage Management Practices at Selected U.S. Nuclear Plants  

SciTech Connect

This paper presents insights gained from a study of the outage management practices at a number of U.S. nuclear plants. The objective of the study was to conduct an in-depth review of the current practices of outage management at these selected plants and identify important factors that have contributed to the recent success of their outage performance. Two BWR-4, three BWR-6, and two 3-loop Westinghouse PWR plants were selected for this survey. The results of this study can be used to formulate outage improvement efforts for nuclear plants in other countries. (author)

Lin, James C. [ABSG Consulting Inc., Irvine, CA (United States)

2002-07-01T23:59:59.000Z

143

Synthesis of power plant outage schedules. Final technical report, April 1995-January 1996  

SciTech Connect

This document provides a report on the creation of domain theories in the power plant outage domain. These were developed in conjunction with the creation of a demonstration system of advanced scheduling technology for the outage problem. In 1994 personnel from Rome Laboratory (RL), Kaman Science (KS), Kestrel Institute, and the Electric Power Research Institute (EPRI) began a joint project to develop scheduling tools for power plant outage activities. This report describes our support for this joint effort. The project uses KIDS (Kestrel Interactive Development System) to generate schedulers from formal specifications of the power plant domain outage activities.

Smith, D.R.

1997-07-01T23:59:59.000Z

144

Department of Energy Order No. 202-05-03 Notice of Planned Outages...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Outages, in Sequence During January 2006 More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power...

145

Draft!07"18"2011! 1 Turning the Tide on Outages1  

E-Print Network (OSTI)

mitigate outages during the harshest weather, terrorist attacks, or natural disasters. This system into IIT Main Campus's current infrastructure. The initiative's approach is to implement local microgrids

Amin, S. Massoud

146

Transmission Rights-of-Way Vegetation Management Plan Framework  

Science Conference Proceedings (OSTI)

The North American Electric Reliability Corporation (NERC) FAC-003-1 standards for vegetation management on electric transmission line rights-of-way (ROWs) have been in place since April 2006. These mandatory standards regulate electric transmission line vegetation management across the United States, and are narrowly focused on minimizing vegetation caused outages in electricity transmission. The NERC FAC-003-1 standards are potentially broadened by the voluntary American National Standards Institute (A...

2008-08-05T23:59:59.000Z

147

Field Guide: Transmission Line Aerial Marking and Lighting  

Science Conference Proceedings (OSTI)

Electric transmission lines and wild birds must co-exist. Power lines traverse birds' flight routes, birds commonly roost on lines and poles, and birds make their nests—the largest of which weigh thousands of pounds—on transmission structures. Some avian activities can have deleterious effects on outdoor structures and transmission—for example, nests have been known to collapse and span critical clearances during storms, resulting in outages. Accordingly, it is important for ...

2013-11-22T23:59:59.000Z

148

Nonlinear magnetoinductive transmission lines  

E-Print Network (OSTI)

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent cap...

Lazarides, Nikos; Tsironis, G P

2011-01-01T23:59:59.000Z

149

Characteristics and trends in a National Study of Consumer Outage Costs  

E-Print Network (OSTI)

cost per event Outage cost per kWh Peak kW demand Annualcost per event Outage cost per kWh Peak kW demand Annualfrom $3,124 to $1,369. The cost per kWh and cost per peak kW

Lawton, Leora; Eto, Joseph H.; Katz, Aaron; Sullivan, Michael

2003-01-01T23:59:59.000Z

150

A Tight Lower Bound to the Outage Probability of Discrete-Input Block-Fading Channels  

Science Conference Proceedings (OSTI)

In this correspondence, a tight lower bound to the outage probability of discrete-input Nakagami-m block-fading channels is proposed. The approach permits an efficient method for numerical evaluation of the bound, providing an additional tool for system ... Keywords: Block-fading channel, diversity, error probability, outage probability, rate-diversity tradeoff, signal-to-noise ratio (SNR)-exponent

K. D. Nguyen; A. Guillen i Fabregas; L. K. Rasmussen

2007-11-01T23:59:59.000Z

151

MULTIPLIER CIRCUIT  

DOE Patents (OSTI)

An electronic fast multiplier circuit utilizing a transistor controlled voltage divider network is presented. The multiplier includes a stepped potentiometer in which solid state or transistor switches are substituted for mechanical wipers in order to obtain electronic switching that is extremely fast as compared to the usual servo-driven mechanical wipers. While this multiplier circuit operates as an approximation and in steps to obtain a voltage that is the product of two input voltages, any desired degree of accuracy can be obtained with the proper number of increments and adjustment of parameters. (AEC)

Chase, R.L.

1963-05-01T23:59:59.000Z

152

Market Assessment of Planned Refinery Outages March Â… June 2009  

Gasoline and Diesel Fuel Update (EIA)

09)/1 09)/1 Market Assessment of Planned Refinery Outages March - June 2009 March 2009 Energy Information Administration Office of Oil and Gas U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be attributed to the Energy Information Administration and should not be construed as advocating or reflecting any policy position of the U.S. Department of Energy or any other organization. Service Reports are prepared by the Energy Information Administration upon special request and are based on assumptions specified by the requestor.

153

Minimize substation outage time by maximizing in-service testing  

Science Conference Proceedings (OSTI)

Most substation maintenance work is based on fixed schedules rather than on known need. Scheduled maintenance is essential and cannot be eliminated entirely, but priority should be given to equipment known to be deteriorated or defective. It makes no sense to perform costly, scheduled outage maintenance work when other equipment is failing because of undetected defects. The following should be included as major elements in an energized testing program: visual inspections; infrared inspection; corona inspection; percent oxygen in gas samples drawn from nitrogen-blanketed transformers; percent total combustible gas in gas samples drawn from nitrogen-blanketed transformers; dissolved gas analysis; oil quality tests; free water in the sample; dissolved water in oil; dissolved metals-in-oil analysis; furfural concentration analysis; SF[sub 6] analysis; battery testing; the substation grounding grid; and protective relays. 4 figs.

Lautenschlager, M. (High Voltage Maintenance Corp., Indianapolis, IN (United States))

1994-05-01T23:59:59.000Z

154

TIMING CIRCUIT  

DOE Patents (OSTI)

An electronic circuit is described for precisely controlling the power delivered to a load from an a-c source, and is particularly useful as a welder timer. The power is delivered in uniform pulses, produced by a thyratron, the number of pulses being controlled by a one-shot multivibrator. The starting pulse is synchronized with the a-c line frequency so that each multivlbrator cycle begins at about the same point in the a-c cycle.

Heyd, J.W.

1959-07-14T23:59:59.000Z

155

Analysis of Country-wide Internet Outages Caused by Censorship  

E-Print Network (OSTI)

In the first months of 2011, Internet communications were disrupted in several North African countries in response to civilian protests and threats of civil war. In this paper we analyze episodes of these disruptions in two countries: Egypt and Libya. Our analysis relies on multiple sources of large-scale data already available to academic researchers: BGP interdomain routing control plane data; unsolicited data plane traffic to unassigned address space; active macroscopic traceroute measurements; RIR delegation files; and MaxMind’s geolocation database. We used the latter two data sets to determine which IP address ranges were allocated to entities within each country, and then mapped these IP addresses of interest to BGP-announced address ranges (prefixes) and origin ASes using publicly available BGP data repositories in the U.S. and Europe. We then analyzed observable activity related to these sets of prefixes and ASes throughout the censorship episodes. Using both control plane and data plane data sets in combination allowed us to narrow down which forms of Internet access disruption were implemented in a given region over time. Among other insights, we detected what we believe were Libya’s attempts to test firewallbased blocking before they executed more aggressive BGP-based disconnection. Our methodology could be used, and automated, to detect outages or similar macroscopically disruptive events in other geographic or topological regions.

Alberto Dainotti; Kimberly C. Claffy; Michele Russo; Claudio Squarcella; Marco Chiesa; Antonio Pescapé; Emile Aben

2011-01-01T23:59:59.000Z

156

No (Brain)power Outage at a Competition Like No Other  

Office of Science (SC) Website

No (Brain)power Outage at a Competition Like No Other News In the News In Focus 2013 2012 2011 2010 2009 2008 2007 2006 2005 Presentations & Testimony Recovery Act Contact...

157

U.S. - Canada Power System Outage Task Force: Final Report on the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Canada Power System Outage Task Force: Final Report on the - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations On August 14, 2003, the largest power blackout in North American history affected an area with an estimated 50 million people and 61,800 megawatts (MW) of electric load in the states of Ohio, Michigan, Pennsylvania, New York, Vermont, Massachusetts, Connecticut and New Jersey, and the Canadian province of Ontario. U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations More Documents & Publications Blackout 2003: Blackout Final Implementation Report Blackout 2003: The August 14, 2003 Blackout One Year Later: Actions Taken

158

Efficient algorithms for outage minimization in parallel fading channels with limited feedback  

Science Conference Proceedings (OSTI)

In this paper, we address the optimal power allocation problem for minimizing the notion of information theoretic outage for an M parallel block-Rayleigh-fading channels using a finite rate power codebook (limited feedback). In contrast to the ...

YuanYuan He; Subhrakanti Dey

2009-09-01T23:59:59.000Z

159

A Novel Dynamic Voltage Restorer with Outage Handling Capability Using Fuzzy Logic Controler  

Science Conference Proceedings (OSTI)

This paper presents a novel dynamic voltage restorer (DVR) capable of handling deep sags including outage on a low voltage distribution system. The DVR recovers sags up to 10% of nominal voltage; otherwise, it will operate as an uninterruptible power ...

M. Ashari; T. Hiyama; M. Pujiantara; H. Suryoatmojo; M. Hery Purnomo

2007-09-01T23:59:59.000Z

160

ORNL Network Outage, Saturday, June 12, 6:00-8:00 a.m.  

NLE Websites -- All DOE Office Websites (Extended Search)

June 12, 2010, 6:00 a.m. to 8:00 a.m. EDT All externally accessible ORNL servers, including the ORNL DAAC Web Site, http:daac.ornl.gov will experience brief network outages...

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Omega Transmission Lines  

E-Print Network (OSTI)

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

162

LOGIC CIRCUIT  

DOE Patents (OSTI)

A device for safety rod counting in a nuclear reactor is described. A Wheatstone bridge circuit is adapted to prevent de-energizing the hopper coils of a ball backup system if safety rods, sufficient in total control effect, properly enter the reactor core to effect shut down. A plurality of resistances form one arm of the bridge, each resistance being associated with a particular safety rod and weighted in value according to the control effect of the particular safety rod. Switching means are used to switch each of the resistances in and out of the bridge circuit responsive to the presence of a particular safety rod in its effective position in the reactor core and responsive to the attainment of a predetermined velocity by a particular safety rod enroute to its effective position. The bridge is unbalanced in one direction during normal reactor operation prior to the generation of a scram signal and the switching means and resistances are adapted to unbalance the bridge in the opposite direction if the safety rods produce a predetermined amount of control effect in response to the scram signal. The bridge unbalance reversal is then utilized to prevent the actuation of the ball backup system, or, conversely, a failure of the safety rods to produce the predetermined effect produces no unbalance reversal and the ball backup system is actuated. (AEC)

Strong, G.H.; Faught, M.L.

1963-12-24T23:59:59.000Z

163

A Review of Power Outages and Restoration Following the June 2012 Derecho |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Review of Power Outages and Restoration Following the June 2012 A Review of Power Outages and Restoration Following the June 2012 Derecho A Review of Power Outages and Restoration Following the June 2012 Derecho August 7, 2012 - 11:16am Addthis The Office of Electricity Delivery and Energy Reliability has released a report that reviews power outages and restoration efforts following the June 29, 2012 Derecho and compares them to outages and restoration efforts following other spring and summer storms in the Ohio Valley and Mid-Atlantic regions. View the Report. Addthis Related Articles Salazar, Chu Announce Major Offshore Wind Initiatives A Review of Power Outages and Restoration Following the June 2012 Derecho Response to Hurricane Irene - Restoring Power on the East Coast President Barack Obama listens to Acting Energy Secretary Daniel B. Poneman during a meeting with electric utility CEOs and trade association representatives at the Department of Energy in Washington, D.C., May 8, 2013. | Official White House Photo by Pete Souza.

164

Commutation circuit for an HVDC circuit breaker  

DOE Patents (OSTI)

A commutation circuit for a high voltage DC circuit breaker incorporates a resistor capacitor combination and a charging circuit connected to the main breaker, such that a commutating capacitor is discharged in opposition to the load current to force the current in an arc after breaker opening to zero to facilitate arc interruption. In a particular embodiment, a normally open commutating circuit is connected across the contacts of a main DC circuit breaker to absorb the inductive system energy trapped by breaker opening and to limit recovery voltages to a level tolerable by the commutating circuit components. 13 figs.

Premerlani, W.J.

1981-11-10T23:59:59.000Z

165

Commutation circuit for an HVDC circuit breaker  

DOE Patents (OSTI)

A commutation circuit for a high voltage DC circuit breaker incorporates a resistor capacitor combination and a charging circuit connected to the main breaker, such that a commutating capacitor is discharged in opposition to the load current to force the current in an arc after breaker opening to zero to facilitate arc interruption. In a particular embodiment, a normally open commutating circuit is connected across the contacts of a main DC circuit breaker to absorb the inductive system energy trapped by breaker opening and to limit recovery voltages to a level tolerable by the commutating circuit components.

Premerlani, William J. (Scotia, NY)

1981-01-01T23:59:59.000Z

166

DOE Transmission Capacity Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

167

Transmission INTRODUCTION  

E-Print Network (OSTI)

Transmission INTRODUCTION An electrical power system requires constant, second by second, balancing to maintain control over the transmission system can result in failure of the entire electrical system of supply, demand, and transmission capability. Transmission system operators are primarily responsible

168

Condition Assessment Techniques for Laminar Dielectric Transmission Cable Systems  

Science Conference Proceedings (OSTI)

As aging and higher circuit loadings lead to increased failures of pipe-type cable systems, utilities need effective techniques for assessing the key components of these systems. Many off-line and on-line diagnostic and assessment techniques are in use to inspect the condition of laminar dielectric cable systems. However, because of the high labor costs and required circuit outage of off-line testing, much of the current research and development focuses on methods of on-line monitoring. A number of mecha...

2010-12-23T23:59:59.000Z

169

Transmission Line Availability Data Guidelines and Definitions  

E-Print Network (OSTI)

to permit the evaluation of historical performance based on availability or outages. Despite this evolving..................................................................................................... 16 4.2.1. Non-Outage States .................................................................................................. 17 4.2.2. Outage States

McCalley, James D.

170

Field Guide: Visual Inspection of Avian Issues on Transmission and Distribution Structures  

Science Conference Proceedings (OSTI)

Electric transmission lines and wild birds must co-exist. Power lines traverse birds' flight routes, birds commonly roost on lines and poles, and birds make their nests—the largest of which weigh thousands of pounds—on transmission structures. Some avian activities can have deleterious effects on outdoor structures and transmission—for example, nests have been known to collapse and span critical clearances during storms, resulting in outages. Accordingly, it is important for ...

2013-11-25T23:59:59.000Z

171

ORNL Network Outage, Friday, April 15, 9:30 p.m. to Date  

NLE Websites -- All DOE Office Websites (Extended Search)

Outage Outage All externally accessible ORNL servers, including the ORNL DAAC Web Site, http://daac.ornl.gov are experiencing network outages or slow connectivity at this time. The ORNL Information Technology's Cyber Security Program is working hard to restore full external functionality. We apologize for this inconvenience and appreciate your patience during our down time. At this time you can explore our Web site and access data products including MODIS Land Products Subsets, albeit slowly. The following tools: Mercury (Simple Search and Advanced Product Search) WebGIS Spatial Data Access Tool (SDAT) Thematic Real-time Environmental Distributed Data Services (THREDDS) Data Server (TDS) as well as the following Web Sites: Mast-DC FLUXNET are not available. You may experience problems signing-in or

172

Power Outages Update: Post-Tropical Cyclone Sandy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Outages Update: Post-Tropical Cyclone Sandy Outages Update: Post-Tropical Cyclone Sandy Power Outages Update: Post-Tropical Cyclone Sandy October 29, 2012 - 9:37pm Addthis Sandy made landfall as a post-tropical cyclone on the southern coast of New Jersey near Atlantic City at 8 p.m. with top sustained winds of 80 mph. | Photo courtesy of NOAA Sandy made landfall as a post-tropical cyclone on the southern coast of New Jersey near Atlantic City at 8 p.m. with top sustained winds of 80 mph. | Photo courtesy of NOAA Dan Leistikow Dan Leistikow Former Director, Office of Public Affairs As of 8:00 pm EDT on October 29, there were more than 3.6 million customers without power in the affected states. The Energy Department is continuing to monitor the progress of the storm throughout the night and will publish

173

Market Assessment of Refinery Outages Planned for March 2011 through June 2011  

Gasoline and Diesel Fuel Update (EIA)

Assessment of Refinery Assessment of Refinery Outages Planned for March 2011 through June 2011 APRIL 2011 www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration / Market Assessment of Planned Refinery Outages / March 2011 - June 2011 ii This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies. U.S. Energy Information Administration / Market Assessment of Planned Refinery Outages /

174

Automatic Scheduling of Outages of Nuclear Power Plants with Time Windows  

E-Print Network (OSTI)

We report on a successful project for transference of advanced AI technology into the domain of planning of outages of nuclear power plants as part of DOD's dual-use program. ROMAN (Rome Lab Outage Manager) is the prototype system that was developed as a result of this project. ROMAN's main innovation compared to the current state of the art of outage management tools is its capability to automatically enforce safety constraints during the planning and scheduling phase. Another innovative aspect of ROMAN is the generation of more robust schedules that are feasible over time windows. In other words, ROMAN generates a family of schedules by assigning time intervals as start times to activities rather than single point start times, without afecting the overall duration of the project. ROMAN uses a constraint satisfaction paradigm combining a global search tactic with constraint propagation. The derivation of very specialized representations for the constraints to perform efficient propaga...

Carla P. Gomes

1996-01-01T23:59:59.000Z

175

Nuclear Safety Risk Management in Refueling Outage of Qinshan Nuclear Power Plant  

SciTech Connect

The NPP is used to planning maintenance, in-service inspection, surveillance test, fuel handling and design modification in the refueling outage; the operator response capability will be reduced plus some of the plant systems out of service or loss of power at this time. Based on 8 times refueling outage experiences of the Qinshan NPP, this article provide some good practice and lesson learned for the nuclear safety risk management focus at four safety function areas of Residual Heat Removal Capability, Inventory Control, Power availability and Reactivity control. (authors)

Meijing Wu; Guozhang Shen [Qinshan Nuclear power company (China)

2006-07-01T23:59:59.000Z

176

Outage Performance of OFDM-Based Selective Decode-and-Forward Cooperative Networks Over Nakagami-m Fading Channels  

Science Conference Proceedings (OSTI)

In this paper, we investigate the outage performance of OFDM-based selective decode-and-forward cooperative networks over independent but not necessarily identically distributed (i.n.i.d.) Nakagami-m fading channels, with integer values of parameter ... Keywords: Cooperative communication, Nakagami-m fading, OFDM, Outage probability

Wendong Yang; Weiwei Yang; Yueming Cai

2011-02-01T23:59:59.000Z

177

Outage Performance of Dual-Hop AF Relay Channels with Co-Channel Interferences over Rayleigh Fading  

Science Conference Proceedings (OSTI)

This paper studies the outage performance of a dual-hop amplify-and-forward (AF) relay fading channel in an interference-limited environment. The relay and destination nodes are corrupted by multiple co-channel Rayleigh interferences. New exact closed-form ... Keywords: Amplify and-forward relay, Co-channel interference, Nonregenerative relay, Outage probability, Rayleigh fading

Aleksandra M. Cvetkovi?; Dejan N. Mili?; Aleksandar S. Cvetkovi?; Mihajlo Stefanovi?

2013-06-01T23:59:59.000Z

178

Cross-layer interaction between spatial and multi-user diversity in selective feedback systems: outage capacity analysis  

Science Conference Proceedings (OSTI)

In this paper, we explore spatial vs. multi-user diversity tradeoffs in terms of outage capacity for a non-homogeneous cellular system with selective feedback. More precisely, we analytically derive an upper bound of the outage capacity of both a SISO ... Keywords: cross-layer designs, multi-antenna schemes, multi-user diversity, selective scheduling, spatial diversity, wireless systems

José López Vicario; Carles Antón-Haro

2006-07-01T23:59:59.000Z

179

Transmission Capacity of Wireless Ad Hoc Networks with Energy Harvesting Nodes  

E-Print Network (OSTI)

Transmission capacity of an ad hoc wireless network is analyzed when each node of the network harvests energy from nature, e.g. solar, wind, vibration etc. Transmission capacity is the maximum allowable density of nodes, satisfying a per transmitter-receiver rate, and an outage probability constraint. Energy arrivals at each node are assumed to follow a Bernoulli distribution, and each node stores energy using an energy buffer/battery. For ALOHA medium access protocol (MAP), optimal transmission probability that maximizes the transmission capacity is derived as a function of the energy arrival distribution. Game theoretic analysis is also presented for ALOHA MAP, where each transmitter tries to maximize its own throughput, and symmetric Nash equilibrium is derived. For CSMA MAP, back-off probability and outage probability are derived in terms of input energy distribution, thereby characterizing the transmission capacity.

Vaze, Rahul

2012-01-01T23:59:59.000Z

180

96 IEEE power & energy magazine march/april 2005 THE MASSIVE POWER OUTAGE OF  

E-Print Network (OSTI)

collaboration among economists, scientists, and engineers to slowly but surely transform the power grid96 IEEE power & energy magazine march/april 2005 T THE MASSIVE POWER OUTAGE OF August 2003 underscored the vulnerabil- ity of our nation's power grid and the fact that this vital yet complex infrastruc

Amin, S. Massoud

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Using Remaining Battery lifetime information and Relaying to decrease Outage Probability of a Mobile  

E-Print Network (OSTI)

Using Remaining Battery lifetime information and Relaying to decrease Outage Probability is to demonstrate that by employing relaying and using the remaining battery lifetime information of Mobile is determined based on the remaining battery lifetime of the MT. We assume a linear relationship between

Singh, Suresh

182

ORNL NASA DAAC Web Site Outage, Saturday May 15 from 3:00 a.m...  

NLE Websites -- All DOE Office Websites (Extended Search)

Outage, Saturday, May 15, 2010 3:00 a.m.-5:00 p.m. EDT The ORNL DAAC Web site will be unavailable between 3:00 a.m. and 5:00 p.m., Eastern Daylight Time (EDT), on Saturday, May 15,...

183

Mitigating Cascading Outages on Power Systems: Recent Research Approaches and Emerging Methods  

Science Conference Proceedings (OSTI)

The August 14, 2003 and August 10, 1996 wide area outages are two examples of the cascading failure of a large portion of the North American power grid. Methods of better understanding, predicting, and preventing cascading failures, as well as restoring the power system after such failure, were the topics of a recent NSF/EPRI workshop.

2005-12-19T23:59:59.000Z

184

Unit-Contingent Power Purchase Agreement and Asymmetric Information About Plant Outage  

Science Conference Proceedings (OSTI)

This paper analyzes a unit-contingent power purchase agreement between an electricity distributor and a power plant. Under such a contract the distributor pays the plant a fixed price if the plant is operational and nothing if plant outage occurs. Pricing ... Keywords: electricity industry, risk allocation, spot market, unit-contingent contract

Owen Q. Wu; Volodymyr Babich

2012-04-01T23:59:59.000Z

185

An Efficient Energy Curtailment Scheme For Outage Management in Smart Grid  

E-Print Network (OSTI)

An Efficient Energy Curtailment Scheme For Outage Management in Smart Grid Wayes Tushar§, Jian--In this paper an efficient energy curtailment scheme is studied, which enables the power users of a smart grid. Considering the advantages of a two-way communications infrastructure for any future smart grid, a non

Durrani, Salman

186

Field Guide: Compressors for High-Voltage Circuit Breakers  

Science Conference Proceedings (OSTI)

High-voltage circuit breakers (HVCBs) perform essential protection and control functions on power transmission networks. Circuit breakers have multiple components that must operate in concert in order for the breaker to perform properly. If one component, such as the air or hydraulic system, does not operate correctly, the circuit breaker may misoperate or fail, possibly resulting in equipment damage or an outageboth expensive consequences. To help utilities prevent such undesirable events, this field gu...

2010-12-22T23:59:59.000Z

187

Power Circuit Breaker Component and Sub-System Degradation Modes  

Science Conference Proceedings (OSTI)

The work described in this technical update is part of an ongoing EPRI effort to improve high voltage circuit breaker (HVCB) life management. It presents initial results of investigations of issues concerning transmission-class circuit breaker pump and compressor maintenance, and possible improvements in materials and practices that could improve maintenance effectiveness.

2010-12-23T23:59:59.000Z

188

Determination of equivalent circuit for PVDF shock-pressure gauges  

SciTech Connect

Broadband impedance measurements of a PVDF shock-pressure gauge are used to build an equivalent circuit for the gauge. The essential components are a gauge capacitance and a low-loss transmission line. Component features are consistent with the physical characteristics. With knowledge of this circuit, troublesome oscillations can be anticipated and prevented.

Kotulski, J.D.; Anderson, M.U.; Brock, B.C.; Gomez, J.; Graham, R.A.; Vittitoe, C.N.

1993-07-01T23:59:59.000Z

189

Determination of equivalent circuit for PVDF shock-pressure gauges  

SciTech Connect

Broadband impedance measurements of a PVDF shock-pressure gauge are used to build an equivalent circuit for the gauge. The essential components are a gauge capacitance and a low-loss transmission line. Component features are consistent with the physical characteristics. With knowledge of this circuit, troublesome oscillations can be anticipated and prevented. [copyright]American Institute of Physics

Kotulski, J.D.; Anderson, M.U.; Brock, B.C.; Gomez, J.; Graham, R.A.; Vittitoe, C.N. (Sandia National Laboratories, Albuquerque, New Mexico 87185-5800 (United States))

1994-07-10T23:59:59.000Z

190

Field Guide: Visual Inspection of Avian Issues on Transmission and Distribution Structures (Hard Copy and Standard PDF)  

Science Conference Proceedings (OSTI)

Electric transmission lines and wild birds must co-exist. Power lines traverse birds' flight routes, birds commonly roost on lines and poles, and birds make their nests—the largest of which weigh thousands of pounds—on transmission structures. Some avian activities can have deleterious effects on outdoor structures and transmission—for example, nests have been known to collapse and span critical clearances during storms, resulting in outages. Accordingly, it is important for ...

2012-11-14T23:59:59.000Z

191

LABORATORY V ELECTRIC CIRCUITS  

E-Print Network (OSTI)

are inside materials such as wires or light bulbs. Even though the interactions of electrons inside materials your track lighting uses. So, you decide to build a model of circuits using two bulbs and compare bulbs are as bright as your reference circuit is equivalent to the circuit that your track lighting uses

Minnesota, University of

192

Piezoelectric drive circuit  

DOE Patents (OSTI)

A piezoelectric motor drive circuit is provided which utilizes the piezoelectric elements as oscillators and a Meacham half-bridge approach to develop feedback from the motor ground circuit to produce a signal to drive amplifiers to power the motor. The circuit automatically compensates for shifts in harmonic frequency of the piezoelectric elements due to pressure and temperature changes.

Treu, Jr., Charles A. (Raymore, MO)

1999-08-31T23:59:59.000Z

193

Piezoelectric drive circuit  

DOE Patents (OSTI)

A piezoelectric motor drive circuit is provided which utilizes the piezoelectric elements as oscillators and a Meacham half-bridge approach to develop feedback from the motor ground circuit to produce a signal to drive amplifiers to power the motor. The circuit automatically compensates for shifts in harmonic frequency of the piezoelectric elements due to pressure and temperature changes. 7 figs.

Treu, C.A. Jr.

1999-08-31T23:59:59.000Z

194

CIRCUITS FOR CURRENT MEASUREMENTS  

DOE Patents (OSTI)

Circuits are presented for measurement of a logarithmic scale of current flowing in a high impedance. In one form of the invention the disclosed circuit is in combination with an ionization chamber to measure lonization current. The particular circuit arrangement lncludes a vacuum tube having at least one grid, an ionization chamber connected in series with a high voltage source and the grid of the vacuum tube, and a d-c amplifier feedback circuit. As the ionization chamber current passes between the grid and cathode of the tube, the feedback circuit acts to stabilize the anode current, and the feedback voltage is a measure of the logaritbm of the ionization current.

Cox, R.J.

1958-11-01T23:59:59.000Z

195

Cognitive Multiple Access Network with Outage Margin in the Primary System  

E-Print Network (OSTI)

This paper investigates the problem of spectrally efficient operation of a multiuser uplink cognitive radio system in the presence of a single primary link. The secondary system applies opportunistic interference cancelation (OIC) and decode the primary signal when such an opportunity is created. We derive the achievable rate in the secondary system when OIC is used. This scheme has a practical significance, since it enables rate adaptation without requiring any action from the primary system. The \\emph{exact} expressions for outage probability of the primary user are derived, when the primary system is exposed to interference from secondary users. Moreover, approximated formulas and tight lower and upper bounds for the ergodic sum-rate capacity of the secondary network are found. Next, the power allocation is investigated in the secondary system for maximizing the sum-rate under an outage constraint at the primary system. We formulate the power optimization problem in various scenarios depending on the avail...

Maham, Behrouz; Zhou, Xiangyun; Hjørungnes, Are

2011-01-01T23:59:59.000Z

196

2010 Transmission Reliability Program Peer Review | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Reliability Program Peer Review Transmission Reliability Program Peer Review 2010 Transmission Reliability Program Peer Review The Transmission Reliability research area focuses on two key areas: 1) Real-Time Grid Reliability Management and 2) Reliability and Markets. The first area develops monitoring and analysis tools that process synchrophasor data to enable real-time assessment of grid status and stability margins, with the goal of improving power system reliability and visibility through wide-area measurement and control. It is developing advanced technologies and tools to help create a resilient electric transmission system that can better detect disturbances, accommodate a variety of generation sources, and automatically reconfigure the grid to prevent widespread outages and/or rebalance the system. The second area

197

Virtual Circuits (OSCARS)  

NLE Websites -- All DOE Office Websites (Extended Search)

Virtual Circuits (OSCARS) Virtual Circuits (OSCARS) Services Overview ECS Audio/Video Conferencing Fasterdata IPv6 Network Network Performance Tools (perfSONAR) ESnet OID Registry PGP Key Service Virtual Circuits (OSCARS) OSCARS Case Study Documentation Links Hardware Requirements DOE Grids Service Transition Contact Us Technical Assistance: 1 800-33-ESnet (Inside the US) 1 800-333-7638 (Inside the US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Virtual Circuits (OSCARS) ESnet's On-Demand Secure Circuits and Advance Reservation System (OSCARS) provides multi-domain, high-bandwidth virtual circuits that guarantee end-to-end network data transfer performance. Originally a research concept, OSCARS has grown into a robust production service. Currently

198

STEPS TO ESTABLISH A REAL-TIME TRANSMISSION MONITORING SYSTEM FOR TRANSMISSION OWNERS AND OPERATORS WITHIN THE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STEPS TO ESTABLISH A REAL-TIME TRANSMISSION MONITORING STEPS TO ESTABLISH A REAL-TIME TRANSMISSION MONITORING SYSTEM FOR TRANSMISSION OWNERS AND OPERATORS WITHIN THE EASTERN AND WESTERN INTERCONNECTIONS A REPORT TO CONGRESS PURSUANT TO SECTION 1839 OF THE ENERGY POLICY ACT OF 2005 Prepared by United States Department of Energy & Federal Energy Regulatory Commission February 3, 2006 Report to Congress Joint Report by the Department of Energy and Federal Energy Regulatory Commission on Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western Interconnections February 2006 Executive Summary In August 2003, an electrical outage in one state precipitated a cascading blackout across seven other states and as far north as a province in Canada, leaving more than 50 million

199

Flow-optimized Cooperative Transmission for the Relay Channel  

E-Print Network (OSTI)

This paper describes an approach for half-duplex cooperative transmission to achieve cooperative diversity in a classical three-node relay channel. Assuming availability of channel state information at the source and relay, the approach makes use of this information to optimize distinct flows through the direct link from the source to the destination and the path via the relay, respectively. It is shown that such a design can effectively obtain diversity advantage of the relay channel in both high-rate and low-rate scenarios. When the rate requirement is low, the proposed design gives a second-order outage diversity performance approaching that of full-duplex relaying. When the rate requirement becomes asymptotically large, the design still gives a close-to-second-order outage diversity performance. The design also achieves the best diversity-multiplexing tradeoff possible for the relay channel.

Wong, Tan F; Shea, John M

2007-01-01T23:59:59.000Z

200

Gas pressure reduction circuits  

Science Conference Proceedings (OSTI)

This note describes passive pressure reduction devices for use with sensitive instruments. Two gas circuits are developed which not only provide a pressure reduction under flow demand

D. W. Guillaume; D. DeVries

1989-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Radiation-hardened transistor and integrated circuit  

DOE Patents (OSTI)

A composite transistor is disclosed for use in radiation hardening a CMOS IC formed on an SOI or bulk semiconductor substrate. The composite transistor has a circuit transistor and a blocking transistor connected in series with a common gate connection. A body terminal of the blocking transistor is connected only to a source terminal thereof, and to no other connection point. The blocking transistor acts to prevent a single-event transient (SET) occurring in the circuit transistor from being coupled outside the composite transistor. Similarly, when a SET occurs in the blocking transistor, the circuit transistor prevents the SET from being coupled outside the composite transistor. N-type and P-type composite transistors can be used for each and every transistor in the CMOS IC to radiation harden the IC, and can be used to form inverters and transmission gates which are the building blocks of CMOS ICs.

Ma, Kwok K. (Albuquerque, NM)

2007-11-20T23:59:59.000Z

202

Condition Assessment Techniques for Laminar Dielectric Transmission Cable Systems--2012 Update  

Science Conference Proceedings (OSTI)

As aging and higher circuit loadings lead to increased failures of pipe-type cable systems, utilities need effective techniques for assessing the key components of these systems. Many off-line and on-line diagnostic and assessment techniques are in use to inspect the condition of laminar dielectric cable systems. Because of the high labor costs and required circuit outage of off-line testing, current research and development also focuses on methods of on-line monitoring.A number of ...

2012-11-06T23:59:59.000Z

203

Theory of degenerate three-wave mixing using circuit QED in solid-state circuits  

Science Conference Proceedings (OSTI)

We study the theory of degenerate three-wave mixing and the generation of squeezed microwaves using circuit quantum electrodynamics in solid state circuits. The Hamiltonian for degenerate three-wave mixing, which seemed to be given phenomenologically in quantum optics, is derived by quantum mechanical calculations. The nonlinear medium needed in three-wave mixing is composed of a series of superconducting charge qubits which are located inside two superconducting transmission-line resonators. Here, the multiqubit ensemble is present to enhance the effective coupling constant between the two modes in the transmission-line resonators. In the squeezing process, the qubits are kept in their ground states so that their decoherence does not corrupt the squeezing. The main obstacle preventing a large squeezing efficiency is the decay rate of the transmission-line resonator.

Cao, Ye [Key Laboratory of Atomic and Molecular Nanosciences and Department of Physics, Tsinghua University, Beijing 100084 (China); Huo, Wen Yi [Institute of Applied Physics and Computational Mathematics, Beijing 100088 (China); Ai, Qing [Institute of Theoretical Physics, Chinese Academy of Sciences, Beijing 100190 (China); Long, Gui Lu [Key Laboratory of Atomic and Molecular Nanosciences and Department of Physics, Tsinghua University, Beijing 100084 (China); Tsinghua National Laboratory For Information Science and Technology, Beijing 100084 (China)

2011-11-15T23:59:59.000Z

204

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

205

LABORATORY IV ELECTRIC CIRCUITS  

E-Print Network (OSTI)

familiar electric curren ts are inside materials such as wires or light bulbs. Even though the interactions your track lighting uses. You decide to build models of circuits with two bulbs connected across, bulbs, and batteries. Use the accompanying legend to build the circuits. Legend: light bulb ba

Minnesota, University of

206

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

207

Using Relays for Circuit Breaker Diagnostics  

Science Conference Proceedings (OSTI)

This report updates the ongoing investigation by the Electric Power Research Institute (EPRI) of how microprocessor based protective relays programmed with logic and measurements can monitor trip time performance of power circuit breakers and alarm for malfunctions or wear problems. The report describes the programming developed by the EPRI and American Transmission Company (ATC) project team to use existing relays to time first trips of selected breakers. ATC carried out laboratory ...

2012-12-13T23:59:59.000Z

208

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

209

Compensated gain control circuit for buck regulator command charge circuit  

DOE Patents (OSTI)

A buck regulator command charge circuit includes a compensated-gain control signal for compensating for changes in the component values in order to achieve optimal voltage regulation. The compensated-gain control circuit includes an automatic-gain control circuit for generating a variable-gain control signal. The automatic-gain control circuit is formed of a precision rectifier circuit, a filter network, an error amplifier, and an integrator circuit.

Barrett, David M. (Albuquerque, NM)

1996-01-01T23:59:59.000Z

210

Quantum Interference in Plasmonic Circuits  

E-Print Network (OSTI)

Surface plasmon polaritons (plasmons) are a combination of light and a collective oscillation of the free electron plasma at metal-dielectric interfaces. This interaction allows sub-wavelength confinement of light, beyond the diffraction limit inherent to dielectric structures. The resulting electromagnetic fields are more intense and the strength of optical interactions between metallic structures and light-sources or detectors can be increased. Plasmons maintain non-classical photon statistics and preserve entanglement on plasmon-assisted transmission through thin, patterned metallic films or weakly confining waveguides. For quantum applications it is essential that plasmons behave as indistinguishable quantum particles. Here we report on a quantum interference experiment in a nanoscale plasmonic circuit consisting of an on-chip plasmon beam splitter with integrated superconducting single-photon detectors to allow efficient single plasmon detection. We demonstrate quantum mechanical interaction between pair...

Heeres, Reinier W; Zwiller, Valery

2013-01-01T23:59:59.000Z

211

Cooperative Transmission Using Quasi-Orthogonal Space-Time Block Codes with Adaptive Decode-and-Forward Relaying Protocol  

Science Conference Proceedings (OSTI)

In this paper, we propose a cooperative transmission scheme using quasi-orthogonal space-time block codes (QOSTBCs) for multiple-input multiple-output (MIMO) relay networks. Comparing with the conventional cooperative transmission scheme using orthogonal ... Keywords: Channel state information (CSI) feedback, Decode-and-forward (DF), Multiple-input multiple-output (MIMO) relay, Outage probability, Space-time block codes (STBCs)

Yang Gao; Jianhua Ge; Yancheng Ji

2012-04-01T23:59:59.000Z

212

Guidelines for the Interpretation of Dissolved Gas Analysis (DGA) for Paper-Insulated Underground Transmission Cable Systems  

Science Conference Proceedings (OSTI)

Laminar dielectric underground transmission cables represent a utility investment of approximately $20 billion. Protection of this investment depends on proper condition monitoring to avoid unscheduled outages, which can amount to hundreds of thousands of dollars per incident. The dissolved gas analysis (DGA) technique -- which has been successfully applied to transformers -- has now proven itself a cost-effective alternative for condition assessment of these paper-insulated underground transmission cabl...

2000-09-13T23:59:59.000Z

213

Sensor readout detector circuit  

DOE Patents (OSTI)

A sensor readout detector circuit is disclosed that is capable of detecting sensor signals down to a few nanoamperes or less in a high (microampere) background noise level. The circuit operates at a very low standby power level and is triggerable by a sensor event signal that is above a predetermined threshold level. A plurality of sensor readout detector circuits can be formed on a substrate as an integrated circuit (IC). These circuits can operate to process data from an array of sensors in parallel, with only data from active sensors being processed for digitization and analysis. This allows the IC to operate at a low power level with a high data throughput for the active sensors. The circuit may be used with many different types of sensors, including photodetectors, capacitance sensors, chemically-sensitive sensors or combinations thereof to provide a capability for recording transient events or for recording data for a predetermined period of time following an event trigger. The sensor readout detector circuit has applications for portable or satellite-based sensor systems. 6 figs.

Chu, D.D.; Thelen, D.C. Jr.

1998-08-11T23:59:59.000Z

214

Sensor readout detector circuit  

DOE Patents (OSTI)

A sensor readout detector circuit is disclosed that is capable of detecting sensor signals down to a few nanoamperes or less in a high (microampere) background noise level. The circuit operates at a very low standby power level and is triggerable by a sensor event signal that is above a predetermined threshold level. A plurality of sensor readout detector circuits can be formed on a substrate as an integrated circuit (IC). These circuits can operate to process data from an array of sensors in parallel, with only data from active sensors being processed for digitization and analysis. This allows the IC to operate at a low power level with a high data throughput for the active sensors. The circuit may be used with many different types of sensors, including photodetectors, capacitance sensors, chemically-sensitive sensors or combinations thereof to provide a capability for recording transient events or for recording data for a predetermined period of time following an event trigger. The sensor readout detector circuit has applications for portable or satellite-based sensor systems.

Chu, Dahlon D. (Albuquerque, NM); Thelen, Jr., Donald C. (Bozeman, MT)

1998-01-01T23:59:59.000Z

215

DIFFERENTIAL FAULT SENSING CIRCUIT  

DOE Patents (OSTI)

A differential fault sensing circuit is designed for detecting arcing in high-voltage vacuum tubes arranged in parallel. A circuit is provided which senses differences in voltages appearing between corresponding elements likely to fault. Sensitivity of the circuit is adjusted to some level above which arcing will cause detectable differences in voltage. For particular corresponding elements, a group of pulse transformers are connected in parallel with diodes connected across the secondaries thereof so that only voltage excursions are transmitted to a thyratron which is biased to the sensitivity level mentioned.

Roberts, J.H.

1961-09-01T23:59:59.000Z

216

Key Issues for the control of refueling outage duration and costs in PWR Nuclear Power Plants  

SciTech Connect

For several years, EDF, within the framework of the CIDEM1 project and in collaboration with some German Utilities, has undertaken a detailed review of the operating experience both of its own NPP and of foreign units, in order to improve the performances of future units under design, particularly the French-German European Pressurized Reactor (EPR) project. This review made it possible to identify the key issues allowing to decrease the duration of refueling and maintenance outages. These key issues can be classified in 3 categories Design, Maintenance and Logistic Support, Outage Management. Most of the key issues in the design field and some in the logistic support field have been studied and could be integrated into the design of any future PWR unit, as for the EPR project. Some of them could also be adapted to current plants, provided they are feasible and profitable. The organization must be tailored to each country, utility or period: it widely depends on the power production environment, particularly in a deregulation context. (author)

Degrave, Claude [Electricite de France, EDF-SEPTEN, 12-14 avenue Dutrievoz 69628 Villeurbanne Cedex (France)

2002-07-01T23:59:59.000Z

217

Analytical Tools to Predict Distribution Outage Restoration Load. Final Project Report.  

Science Conference Proceedings (OSTI)

The main activity of this project has been twofold: (1) development of a computer model to predict CLPU(Cold Load Pickup) and (2) development of a field measurement and analysis method to obtain the input parameters of the CLPU model. The field measurement and analysis method is called the Step-Voltage-Test (STEPV). The Kootenai Electric Cooperative Appleway 51 feeder in Coeur d`Alene was selected for analysis in this project and STEPV tests were performed in winters of 92 and 93. The STEPV data was analyzed (method and results presented within this report) to obtain the Appleway 51 feeder parameters for prediction by the CLPU model. One only CLPU record was obtained in winter 1994. Unfortunately, the actual CLPU was not dramatic (short outage and moderate temperature) and did not display cyclic restoration current. A predicted Appleway 51 feeder CLPU was generated using the parameters obtained via the STEPV measurement/analysis/algorithm method at the same ambient temperature and outage duration as the measured actual CLPU. The predicted CLPU corresponds reasonably well with the single actual CLPU data obtained in winter 1994 on the Appleway 51 feeder.

Law, John

1994-11-14T23:59:59.000Z

218

Development and interrupting tests on 250KV 8KA HVDC circuit breaker  

SciTech Connect

This paper describes the circuit and component selections, development and equivalent circuit test results on an HVDC circuit breaker for an HVDC transmission line. A puffer type SF/sub 6/ gas interrupter for AC circuit breakers is utilized for interrupting DC current with injection of high-frequency inverse current from a commutating capacitor precharged to HVDC line voltage. Also, the effectiveness of application of the HVDC breaker to an HVDC system with two parallel transmission lines is demonstrated through the EMTP simulation.

Tokuyama, S.; Arimatsu, K.; Hirata, K.; Kato, Y.; Yoshioka, Y.

1985-09-01T23:59:59.000Z

219

Bioluminescent Bioreporter Integrated Circuits  

To address the need for fieldable real-time biological recognition systems, ORNL researchers developed a "laboratory on a chip" using genetically engineered whole cell biosensors attached to integrated circuits (ICs). These bioluminescent ...

220

Optical dynamic circuit services  

Science Conference Proceedings (OSTI)

IP service, leased-line service and POTS service have been the three long-standing communication service offerings of providers. Recently, both commercial and research-andeducation network providers have started offering optical dynamic circuit services. ...

Malathi Veeraraghavan; Mark Karol; George Clapp

2010-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Circuit simulation: some humbling thoughts  

Science Conference Proceedings (OSTI)

A short, very personal note on circuit simulation is presented. It does neither include theoretical background on circuit simulation, nor offers an overview of available software, but just gives some general remarks for a discussion on circuit simulator needs in context to the design and development of accelerator beam instrumentation circuits and systems.

Wendt, Manfred; /Fermilab

2006-01-01T23:59:59.000Z

222

Quantum Circuit Model Topological Model  

E-Print Network (OSTI)

Quantum Circuit Model Topological Model Comparison of Models Topological Quantum Computation Eric Rowell Texas A&M University October 2010 Eric Rowell Topological Quantum Computation #12;Quantum Circuit Model Topological Model Comparison of Models Outline 1 Quantum Circuit Model Gates, Circuits

Rowell, Eric C.

223

Superconducting flux flow digital circuits  

DOE Patents (OSTI)

A NOR/inverter logic gate circuit and a flip flop circuit implemented with superconducting flux flow transistors (SFFTs) are disclosed. Both circuits comprise two SFFTs with feedback lines. They have extremely low power dissipation, very high switching speeds, and the ability to interface between Josephson junction superconductor circuits and conventional microelectronics. 8 figs.

Hietala, V.M.; Martens, J.S.; Zipperian, T.E.

1995-02-14T23:59:59.000Z

224

Superconducting flux flow digital circuits  

DOE Patents (OSTI)

A NOR/inverter logic gate circuit and a flip flop circuit implemented with superconducting flux flow transistors (SFFTs). Both circuits comprise two SFFTs with feedback lines. They have extremely low power dissipation, very high switching speeds, and the ability to interface between Josephson junction superconductor circuits and conventional microelectronics.

Hietala, Vincent M. (Placitas, NM); Martens, Jon S. (Sunnyvale, CA); Zipperian, Thomas E. (Albuquerque, NM)

1995-01-01T23:59:59.000Z

225

Summary of the 2013 EPRI/NATF Industry Summit on Physical Security of Transmission Assets  

Science Conference Proceedings (OSTI)

Compromises to power system physical security can cause long-term outages, which can adversely impact the economy, the environment, public safety, and national security. Such compromises could cost utilities, and ultimately society, billions of dollars. Recent physical security incidents have heightened awareness of the need for greater emphasis on the physical security of substations and transmission facilities. To begin a collaborative process of addressing physical security threats, EPRI and the ...

2013-11-26T23:59:59.000Z

226

Market Assessment of Refinery Outages Planned for October 2009 through January 2010  

Gasoline and Diesel Fuel Update (EIA)

09)/2 09)/2 Market Assessment of Refinery Outages Planned for October 2009 through January 2010 November 2009 Energy Information Administration Office of Oil and Gas U.S. Department of Energy Washington, DC 20585 This report was prepared by the U.S. Energy Information Administration (EIA), the independent statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views herein should not be construed as representing those of the Department or the Administration. Preface and Contacts The Energy Information Administration (EIA) is the independent statistical and analytical

227

ORNL Network Outage, Friday, April 15, 9:30 p.m. to Date  

NLE Websites -- All DOE Office Websites (Extended Search)

Updated 4/25/2011 Updated 4/25/2011 All externally accessible ORNL servers, including the ORNL DAAC Web Site, http://daac.ornl.gov are experiencing network outages or slow connectivity at this time. We apologize for this inconvenience and appreciate your patience during our down time. At this time you can explore our Web site and access data products including MODIS Land Products Subsets, albeit slowly. However, the following Web sites and tools have been taken off the Internet and are not available: Mercury (DAAC Simple Search and Advanced Product Search) WebGIS Spatial Data Access Tool (SDAT) Thematic Real-time Environmental Distributed Data Services (THREDDS) Data Server (TDS) MAST-DC FLUXNET Beija-flor (at ORNL) You may experience problems signing-in or registering with our Web site.

228

Market Assessment of Refinery Outages Planned for October 2010 through January 2011  

Gasoline and Diesel Fuel Update (EIA)

10)/2 10)/2 Market Assessment of Refinery Outages Planned for October 2010 through January 2011 November 2010 Energy Information Administration Office of Petroleum, Gas, and Biofuels Analysis U.S. Department of Energy Washington, DC 20585 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies. E nergy Information Adminis tration Market As s es s ment of P lanned R

229

A Review of Power Outages and Restoration Following the June 2012 Derecho  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 2012 August 2012 A Review of Power Outages and Restoration Following the June 2012 Derecho Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy Reliability U.S. Department of Energy For Further Information This report was prepared by the Office of Electricity Delivery and Energy Reliability under the direction of Patricia Hoffman, Assistant Secretary, and William Bryan, Deputy Assistant Secretary. Specific questions about this report may be directed to Alice Lippert, Senior Technical Advisor (alice.lippert@hq.doe.gov). (Cover image from the National Weather Service) OE/ISER 8/6/2012 1 Background On June 29, 2012, a major storm system known as a derecho ("deh-REY-cho") formed and

230

Reducing Duration of Refueling Outage by Optimizing Core Design and Shuffling Sequence  

SciTech Connect

Reducing the duration of refueling outage is possible by optimizing the core design and the shuffling sequence. For both options software tools have been developed that have been applied to the three most recent cycles of the Borssele plant in the Netherlands. Applicability of the shuffling sequence optimization to boiling water reactors has been demonstrated by a comparison to a recent shuffle plan used in the Hatch plant located in the United States. Their uses have shown that both core design and shuffling sequence optimization can be exploited to reduce the time needed for reloading a core with an in-core shuffling scheme. Ex-core shuffling schemes for pressurized water reactors can still have substantial benefit from a core design using a minimized number of insert shuffles.

Wakker, P.H.; Verhagen, F.C.M.; Bloois, J.T. van; Sutton, W.R. III

2005-07-15T23:59:59.000Z

231

Kangley - Echo Lake Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATEMENT STATEMENT Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Kangley-Echo Lake Transmission Line Project State Involved: Washington Abstract: BPA is proposing to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmis- sion line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as

232

Outage probability and channel capacity for the Nth best relay selection AF relaying over INID Rayleigh fading channels  

Science Conference Proceedings (OSTI)

Cooperative diversity systems have recently been proposed as a way to form virtual antenna schemes without utilizing collocated multiple antennas. In this paper, we consider the Nth best opportunistic amplify-and-forward (AF) cooperative diversity ... Keywords: Nth best OAF, INID Rayleigh fading channels, channel capacity, cooperative diversity, outage probability

K. Ko; C. Woo

2012-11-01T23:59:59.000Z

233

Understanding the Benefits of Dispersed Grid-Connected Photovoltaics: From Avoiding the Next Major Outage to Taming Wholesale Power Markets  

SciTech Connect

Thanks to new solar resource assessment techniques using cloud cover data available from geostationary satellites, it is apparent that grid-connected PV installations can serve to enhance electric grid reliability, preventing or hastening recovery from major power outages and serving to mitigate extreme price spikes in wholesale energy markets. (author)

Letendre, Steven E.; Perez, Richard

2006-07-15T23:59:59.000Z

234

ELECTRONIC TRIGGER CIRCUIT  

DOE Patents (OSTI)

An electronic trigger circuit is described of the type where an output pulse is obtained only after an input voltage has cqualed or exceeded a selected reference voltage. In general, the invention comprises a source of direct current reference voltage in series with an impedance and a diode rectifying element. An input pulse of preselected amplitude causes the diode to conduct and develop a signal across the impedance. The signal is delivered to an amplifier where an output pulse is produced and part of the output is fed back in a positive manner to the diode so that the amplifier produces a steep wave front trigger pulsc at the output. The trigger point of the described circuit is not subject to variation due to the aging, etc., of multi-electrode tabes, since the diode circuit essentially determines the trigger point.

Russell, J.A.G.

1958-01-01T23:59:59.000Z

235

ELECTRONIC MULTIPLIER CIRCUIT  

DOE Patents (OSTI)

An electronic multiplier circuit is described in which an output voltage having an amplitude proportional to the product or quotient of the input signals is accomplished in a novel manner which facilitates simplicity of circuit construction and a high degree of accuracy in accomplishing the multiplying and dividing function. The circuit broadly comprises a multiplier tube in which the plate current is proportional to the voltage applied to a first control grid multiplied by the difference between voltage applied to a second control grid and the voltage applied to the first control grid. Means are provided to apply a first signal to be multiplied to the first control grid together with means for applying the sum of the first signal to be multiplied and a second signal to be multiplied to the second control grid whereby the plate current of the multiplier tube is proportional to the product of the first and second signals to be multiplied.

Thomas, R.E.

1959-08-25T23:59:59.000Z

236

Electrical Circuit Tester  

DOE Patents (OSTI)

An electrical circuit testing device is provided, comprising a case, a digital voltage level testing circuit with a display means, a switch to initiate measurement using the device, a non-shorting switching means for selecting pre-determined electrical wiring configurations to be tested in an outlet, a terminal block, a five-pole electrical plug mounted on the case surface and a set of adapters that can be used for various multiple-pronged electrical outlet configurations for voltages from 100 600 VAC from 50 100 Hz.

Love, Frank (Amarillo, TX)

2006-04-18T23:59:59.000Z

237

Small circuits for cryptography.  

SciTech Connect

This report examines a number of hardware circuit design issues associated with implementing certain functions in FPGA and ASIC technologies. Here we show circuit designs for AES and SHA-1 that have an extremely small hardware footprint, yet show reasonably good performance characteristics as compared to the state of the art designs found in the literature. Our AES performance numbers are fueled by an optimized composite field S-box design for the Stratix chipset. Our SHA-1 designs use register packing and feedback functionalities of the Stratix LE, which reduce the logic element usage by as much as 72% as compared to other SHA-1 designs.

Torgerson, Mark Dolan; Draelos, Timothy John; Schroeppel, Richard Crabtree; Miller, Russell D.; Anderson, William Erik

2005-10-01T23:59:59.000Z

238

The simulation of circuit breaker switching using a composite Cassie-modified Mayr model  

Science Conference Proceedings (OSTI)

In substation electromagnetic compatibility studies or insulation coordination studies it is desirable to get as accurate a representation as possible of the transients generated by faults and switching events. A method of simulating the voltage and current transients generated by a gas blast circuit breaker operation using a composite Cassie-modified Mayr model of the circuit breaker arc is described. It is demonstrated that this gives good agreement with published laboratory measurements of the circuit breaker voltage and current. The transmission line modeling method is used int the construction of the simulation algorithm of the circuit breaker circuit. A method, based on describing the circuit breaker by a transmission-line model (TLM), is used to decouple the non-linear characteristics from the rest of the network.

Thomas, D.W.P.; Pereira, E.T.; Christopoulos, C.; Howe, A.F. [Univ. of Nottingham (United Kingdom). Dept. of Electrical and Electronic Engineering

1995-10-01T23:59:59.000Z

239

Cooperation (Transmission  

E-Print Network (OSTI)

Pricing in Wireless Networks Peter Marbach Department of Computer Science University of Toronto #12; Model/Terminology A B #15; Routes are Fixed #15; C r : Capacity of Node r #15; U r (x r ): Utility Function of Node r 6 #12; Model/Terminology #15; x r : Transmission Rate of Node r #15; y r

Marbach, Peter

240

The Design of a RapidDischarge Varistor System for the MICE Magnet Circuits  

SciTech Connect

The need for a magnet circuit discharge system, in order to protect the magnet HTS leads during a power failure, has been discussed in recent MICE reports [1], [2]. In order to rapidly discharge a magnet, one has to put enough resistance across the lead. The resistance in this case is varistor that is put across the magnet in the event of a power outage. The resistance consists of several diodes, which act as constant voltage resistors and the resistance of the cables connecting the magnets in the circuit to each other and to the power supply. In order for the rapid discharge system to work without quenching the magnets, the voltage across the magnets must be low enough so that the diodes in the quench protection circuit don't fire and cause the magnet current to bypass the superconducting coils. It is proposed that six rapid discharge varistors be installed across the three magnet circuits the power the tracker solenoids, which are connected in series. The focusing magnets, which are also connected in series would have three varistors (one for each magnet). The coupling magnets would have a varistor for each magnet. The peak voltage that is allowed per varistor depends on the number of quench protection diodes that make up the quench protection circuit for each magnet coil circuit. It is proposed that the varistors be water cooled as the magnet circuits are being discharged through them. The water cooling circuit can be supplied with tap water. The tap water flows only when the varistor temperature reaches a temperature of 45 C.

Green, Michael A.

2008-07-23T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Bioluminescent bioreporter integrated circuit  

DOE Patents (OSTI)

Disclosed are monolithic bioelectronic devices comprising a bioreporter and an OASIC. These bioluminescent bioreporter integrated circuit are useful in detecting substances such as pollutants, explosives, and heavy-metals residing in inhospitable areas such as groundwater, industrial process vessels, and battlefields. Also disclosed are methods and apparatus for environmental pollutant detection, oil exploration, drug discovery, industrial process control, and hazardous chemical monitoring.

Simpson, Michael L. (Knoxville, TN); Sayler, Gary S. (Blaine, TN); Paulus, Michael J. (Knoxville, TN)

2000-01-01T23:59:59.000Z

242

Circuit breaker lockout device  

DOE Patents (OSTI)

An improved lockout assembly for locking a circuit breaker in a selected off or on position is provided. The lockout assembly includes a lock block and a lock pin. The lock block has a hollow interior which fits over the free end of a switch handle of the circuit breaker. The lock block includes at least one hole that is placed in registration with a hole in the free end of the switch handle. A lock tab on the lock block serves to align and register the respective holes on the lock block and switch handle. A lock pin is inserted through the registered holes and serves to connect the lock block to the switch handle. Once the lock block and the switch handle are connected, the position of the switch handle is prevented from being changed by the lock tab bumping up against a stationary housing portion of the circuit breaker. When the lock pin installed, an apertured-end portion of the lock pin is in registration with another hole on the lock block. Then a special scissors conforming to O.S.H.A. regulations can be installed, with one or more padlocks, on the lockout assembly to prevent removal of the lock pin from the lockout assembly, thereby preventing removal of the lockout assembly from the circuit breaker. 2 figs.

Kozlowski, L.J.; Shirey, L.A.

1992-11-24T23:59:59.000Z

243

Circuit breaker lockout device  

DOE Patents (OSTI)

An improved lockout assembly for locking a circuit breaker in a selected off or on position is provided. The lockout assembly includes a lock block and a lock pin. The lock block has a hollow interior which fits over the free end of a switch handle of the circuit breaker. The lock block includes at least one hole that is placed in registration with a hole in the free end of the switch handle. A lock tab on the lock block serves to align and register the respective holes on the lock block and switch handle. A lock pin is inserted through the registered holes and serves to connect the lock block to the switch handle. Once the lock block and the switch handle are connected, the position of the switch handle is prevented from being changed by the lock tab bumping up against a stationary housing portion of the circuit breaker. When the lock pin is installed, an apertured-end portion of the lock pin is in registration with another hole on the lock block. Then a special scissors conforming to O.S.H.A. regulations can be installed, with one or more padlocks, on the lockout assembly to prevent removal of the lock pin from the lockout assembly, thereby preventing removal of the lockout assembly from the circuit breaker.

Kozlowski, L.J.; Shirey, L.A.

1991-12-31T23:59:59.000Z

244

Circuit breaker lockout device  

DOE Patents (OSTI)

An improved lockout assembly for locking a circuit breaker in a selected off or on position is provided. The lockout assembly includes a lock block and a lock pin. The lock block has a hollow interior which fits over the free end of a switch handle of the circuit breaker. The lock block includes at least one hole that is placed in registration with a hole in the free end of the switch handle. A lock tab on the lock block serves to align and register the respective holes on the lock block and switch handle. A lock pin is inserted through the registered holes and serves to connect the lock block to the switch handle. Once the lock block and the switch handle are connected, the position of the switch handle is prevented from being changed by the lock tab bumping up against a stationary housing portion of the circuit breaker. When the lock pin installed, an apertured-end portion of the lock pin is in registration with another hole on the lock block. Then a special scissors conforming to O.S.H.A. regulations can be installed, with one or more padlocks, on the lockout assembly to prevent removal of the lock pin from the lockout assembly, thereby preventing removal of the lockout assembly from the circuit breaker.

Kozlowski, Lawrence J. (New Kensington, PA); Shirey, Lawrence A. (North Huntingdon, PA)

1992-01-01T23:59:59.000Z

245

Experiment 2 Meter Circuits  

E-Print Network (OSTI)

1 Experiment 2 Meter Circuits Even in these days of digital circuitry, the d'Arsonval meter to stress a spring. The strain of the spring is read as a deflection of a scale. Most d'Arsonval meter the meter. In this experiment, the basic d'Arsonval meter movement and simple passive circuitry will be used

King, Roger

246

Automatic sweep circuit  

DOE Patents (OSTI)

An automatically sweeping circuit for searching for an evoked response in an output signal in time with respect to a trigger input. Digital counters are used to activate a detector at precise intervals, and monitoring is repeated for statistical accuracy. If the response is not found then a different time window is examined until the signal is found.

Keefe, Donald J. (Lemont, IL)

1980-01-01T23:59:59.000Z

247

Transmission lines on integrated circuits for high speed communication.  

E-Print Network (OSTI)

??As microelectronics continue to scale, the transistor delay decreases while the wire delay remains relatively constant or even increases. The wire or interconnect delay is… (more)

Lee, William Scott

2008-01-01T23:59:59.000Z

248

Short circuit power estimation of static CMOS circuits  

Science Conference Proceedings (OSTI)

This paper presents a simple method to estimate short-circuit power dissipation for static CMOS logic circuits. Short-circuit current expression is derived by accurately interpolating peak points of actual current curves which is influenced by the gate-to-drain ...

Seung-Ho Jung; Jong-Humn Baek; Seok-Yoon Kim

2001-01-01T23:59:59.000Z

249

A transmission line fault locator based on Elman recurrent networks  

Science Conference Proceedings (OSTI)

In this paper, a transmission line fault location model which is based on an Elman recurrent network (ERN) has been presented for balanced and unbalanced short circuit faults. All fault situations with different inception times are implemented on a 380-kV ... Keywords: Elman networks, Fault location, Transmission lines, Wavelet transform

Sami Ekici; Selcuk Yildirim; Mustafa Poyraz

2009-01-01T23:59:59.000Z

250

Methods of fabricating applique circuits  

DOE Patents (OSTI)

Applique circuits suitable for advanced packaging applications are introduced. These structures are particularly suited for the simple integration of large amounts (many nanoFarads) of capacitance into conventional integrated circuit and multichip packaging technology. In operation, applique circuits are bonded to the integrated circuit or other appropriate structure at the point where the capacitance is required, thereby minimizing the effects of parasitic coupling. An immediate application is to problems of noise reduction and control in modern high-frequency circuitry.

Dimos, Duane B. (Albuquerque, NM); Garino, Terry J. (Albuquerque, NM)

1999-09-14T23:59:59.000Z

251

SAS Output  

U.S. Energy Information Administration (EIA) Indexed Site

A. U.S. Transmission Circuit Outages by Type and NERC region, 2012 A. U.S. Transmission Circuit Outages by Type and NERC region, 2012 Outage Type FRCC MRO NPCC RFC SERC SPP TRE WECC Contiguous U.S. Circuit Outage Counts Automatic Outages (Sustained) 151.00 163.00 127.00 272.00 374.00 105.00 80.00 796.00 2,068.00 Non-Automatic Outages (Operational) 77.00 44.00 97.00 230.00 192.00 27.00 45.00 337.00 1,049.00 Non-Automatic Outages (Planned) 2,650.00 453.00 512.00 2,050.00 2,450.00 369.00 472.00 2,744.00 11,700.00 Circuit Outage Hours Automatic Outages (Sustained) 2,852.28 1,312.97 14,244.87 19,857.23 7,123.70 1,509.51 682.60 24,238.64 71,821.80 Non-Automatic Outages (Operational) 186.87 27.08 67.68 186.08 426.59 3.32 13.96 67.59 979.17 Non-Automatic Outages (Planned) 872.65 710.33 1,222.36 1,095.46 503.01 357.44 105.06 1,105.43 5,971.74

252

Data transmission system with distributed microprocessors  

DOE Patents (OSTI)

A data transmission system having a common request line and a special request line in addition to a transmission line. The special request line has priority over the common request line. A plurality of node stations are multi-drop connected to the transmission line. Among the node stations, a supervising station is connected to the special request line and takes precedence over other slave stations to become a master station. The master station collects data from the slave stations. The station connected to the common request line can assign a master control function to any station requesting to be assigned the master control function within a short period of time. Each station has an auto response control circuit. The master station automatically collects data by the auto response controlling circuit independently of the microprocessors of the slave stations.

Nambu, Shigeo (Fuchu, JP)

1985-01-01T23:59:59.000Z

253

GAS PHOTOTUBE CIRCUIT  

DOE Patents (OSTI)

This patent pertains to electronic circuits for measuring the intensity of light and is especially concerned with measurement between preset light thresholds. Such a circuit has application in connection with devices for reading-out information stored on punch cards or tapes where the cards and tapes are translucent. By the novel arrangement of this invention thc sensitivity of a gas phototube is maintained at a low value when the light intensity is below a first threshold level. If the light level rises above the first threshold level, the tube is rendered highly sensitive and an output signal will vary in proportion to the light intensity change. When the light level decreases below a second threshold level, the gas phototube is automatically rendered highly insensitive. Each of these threshold points is adjustable.

Richardson, J.H.

1958-03-01T23:59:59.000Z

254

Airspace: Antarctic Sound Transmission  

E-Print Network (OSTI)

Antarctic Sound Transmission Andrea Polli Director,investigates how sound transmission can contribute to thePoles. How have such transmission-based projects developed

Polli, Andrea

2009-01-01T23:59:59.000Z

255

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

256

Plant Outage Time Savings Provided by Subcritical Physics Testing at Vogtle Unit 2  

SciTech Connect

The most recent core reload design verification physics testing done at Southern Nuclear Company's (SNC) Vogtle Unit 2, performed prior to initial power operations in operating cycle 12, was successfully completed while the reactor was at least 1% {delta}K/K subcritical. The testing program used was the first application of the Subcritical Physics Testing (SPT) program developed by the Westinghouse Electric Company LLC. The SPT program centers on the application of the Westinghouse Subcritical Rod Worth Measurement (SRWM) methodology that was developed in cooperation with the Vogtle Reactor Engineering staff. The SRWM methodology received U. S. Nuclear Regulatory Commission (NRC) approval in August of 2005. The first application of the SPT program occurred at Vogtle Unit 2 in October of 2005. The results of the core design verification measurements obtained during the SPT program demonstrated excellent agreement with prediction, demonstrating that the predicted core characteristics were in excellent agreement with the actual operating characteristics of the core. This paper presents an overview of the SPT Program used at Vogtle Unit 2 during operating cycle 12, and a discussion of the critical path outage time savings the SPT program is capable of providing. (authors)

Cupp, Philip [Southern Nuclear Company (United States); Heibel, M.D. [Westinghouse Electric Company, LLC (United States)

2006-07-01T23:59:59.000Z

257

Power Contracts - Sierra Nevada Region (SNR) - Western Area Power...  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Operations Outage Coordination Standards of Conduct Transmission Planning You are here: SN Home page > Power Operations > Outage Coordination Outage Coordination Outage...

258

Effective Personnel Exposure Control in Shortened Refueling Outages: Final Report: Review of Remote Monitoring Systems in Radiation Protection Applications  

Science Conference Proceedings (OSTI)

Remote monitoring technology (RMT) significantly enhances worker protection and reduces worker radiation exposure, particularly during shortened refueling outages. This report provides a brief description of the hardware and features of remote monitoring systems, then focuses on nuclear plant experiences in applying such systems for enhanced radiation protection. It also discusses EPRI's RMT research program and formation of the RMT Working Group to support research in this area. Such information will gr...

2003-12-02T23:59:59.000Z

259

Experience Based Interview Process for Power Plant Management: With a Pilot Application to Aging of Outage Support Equipment  

Science Conference Proceedings (OSTI)

Plant managers are responsible for ensuring that their facilities meet strategic asset management goals in an increasingly competitive power generation marketplace. This report describes an experience based interview (EBI) method for capturing the knowledge of plant staff to more efficiently identify technical or operational issues and make management decisions that protect assets. Included is a demonstration of the method in a pilot application to aging of support equipment that could impact outages in ...

1999-04-05T23:59:59.000Z

260

Soliton quenching NLTL impulse circuit with a pulse forming network at the output  

DOE Patents (OSTI)

An impulse forming circuit is disclosed which produces a clean impulse from a nonlinear transmission line compressed step function without customary soliton ringing by means of a localized pulse shaping and differentiating network which shunts the nonlinear transmission line output to ground.

McEwan, Thomas E. (Livermore, CA); Dallum, Gregory E. (Livermore, CA)

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Detecting non-Abelian geometric phase in circuit QED  

E-Print Network (OSTI)

We propose a scheme for detecting noncommutative feature of the non-Abelian geometric phase in circuit QED, which involves three transmon qubits capacitively coupled to an one-dimensional transmission line resonator. By controlling the external magnetic flux of the transmon qubits, we can obtain an effective tripod interaction of our circuit QED setup. The noncommutative feature of the non-Abelian geometric phase is manifested that for an initial state undergo two specific loops in different order will result in different final states. Our numerical calculations show that this difference can be unambiguously detected in the proposed system.

Man-Lv Peng; Jian Zhou; Zheng-Yuan Xue

2013-03-03T23:59:59.000Z

262

Sequential circuit design for radiation hardened multiple voltage integrated circuits  

DOE Patents (OSTI)

The present invention includes a radiation hardened sequential circuit, such as a bistable circuit, flip-flop or other suitable design that presents substantial immunity to ionizing radiation while simultaneously maintaining a low operating voltage. In one embodiment, the circuit includes a plurality of logic elements that operate on relatively low voltage, and a master and slave latches each having storage elements that operate on a relatively high voltage.

Clark, Lawrence T. (Phoenix, AZ); McIver, III, John K. (Albuquerque, NM)

2009-11-24T23:59:59.000Z

263

EPRI HVDC Reference Book: Chapter 13 - DC Transmission with Voltage Sourced Converters  

Science Conference Proceedings (OSTI)

DC Transmission with voltage sourced converters (VSC) is a relatively new development in DC transmission. This report covers circuits, theory and capabilities of this new development in HVDC transmission. The report will be a Chapter in the comprehensive HVDC reference guide that EPRI is preparing.

2009-12-21T23:59:59.000Z

264

Integrated Decision Algorithms for Auto-steered Electric Transmission System Asset Management  

Science Conference Proceedings (OSTI)

Electric power transmission systems are comprised of a large number of physical assets, including transmission lines, power transformers, and circuit breakers, that are capital-intensive, highly distributed, and may fail. Managing these assets under ... Keywords: Benders decomposition, asset management, condition monitoring, decision algorithms, electric transmission, optimization, service-oriented architecture, software-hardware

James Mccalley; Vasant Honavar; Sarah Ryan; William Meeker; Daji Qiao; Ron Roberts; Yuan Li; Jyotishman Pathak; Mujing Ye; Yili Hong

2007-05-01T23:59:59.000Z

265

Jitter compensation circuit  

DOE Patents (OSTI)

The instantaneous V.sub.co signal on a charging capacitor is sampled and the charge voltage on capacitor C.sub.o is captured just prior to its discharge into the first stage of magnetic modulator. The captured signal is applied to an averaging circuit with a long time constant and to the positive input terminal of a differential amplifier. The averaged V.sub. co signal is split between a gain stage (G=0.975) and a feedback stage that determines the slope of the voltage ramp applied to the high speed comparator. The 97.5% portion of the averaged V.sub.co signal is applied to the negative input of a differential amplifier gain stage (G=10). The differential amplifier produces an error signal by subtracting 97.5% of the averaged V.sub.co signal from the instantaneous value of sampled V.sub.co signal and multiplying the difference by ten. The resulting error signal is applied to the positive input of a high speed comparator. The error signal is then compared to a voltage ramp that is proportional to the averaged V.sub.co values squared divided by the total volt-second product of the magnetic compression circuit.

Sullivan, James S. (Livermore, CA); Ball, Don G. (Livermore, CA)

1997-01-01T23:59:59.000Z

266

Jitter compensation circuit  

DOE Patents (OSTI)

The instantaneous V{sub co} signal on a charging capacitor is sampled and the charge voltage on capacitor C{sub o} is captured just prior to its discharge into the first stage of magnetic modulator. The captured signal is applied to an averaging circuit with a long time constant and to the positive input terminal of a differential amplifier. The averaged V{sub co} signal is split between a gain stage (G = 0.975) and a feedback stage that determines the slope of the voltage ramp applied to the high speed comparator. The 97.5% portion of the averaged V{sub co} signal is applied to the negative input of a differential amplifier gain stage (G = 10). The differential amplifier produces an error signal by subtracting 97.5% of the averaged V{sub co} signal from the instantaneous value of sampled V{sub co} signal and multiplying the difference by ten. The resulting error signal is applied to the positive input of a high speed comparator. The error signal is then compared to a voltage ramp that is proportional to the averaged V{sub co} values squared divided by the total volt-second product of the magnetic compression circuit. 11 figs.

Sullivan, J.S.; Ball, D.G.

1997-09-09T23:59:59.000Z

267

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

268

Hydromechanical transmission  

DOE Patents (OSTI)

A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

Orshansky, Jr. deceased, Elias (LATE OF San Francisco, CA); Weseloh, William E. (San Diego, CA)

1978-01-01T23:59:59.000Z

269

PRECISION TIME-DELAY CIRCUIT  

DOE Patents (OSTI)

A tine-delay circuit which produces a delay time in d. The circuit a capacitor, an te back resistance, connected serially with the anode of the diode going to ground. At the start of the time delay a negative stepfunction is applied to the series circuit and initiates a half-cycle transient oscillatory voltage terminated by a transient oscillatory voltage of substantially higher frequency. The output of the delay circuit is taken at the junction of the inductor and diode where a sudden voltage rise appears after the initiation of the higher frequency transient oscillations.

Creveling, R.

1959-03-17T23:59:59.000Z

270

Spike Neuromorphic Carbon Nanotube Circuits  

E-Print Network (OSTI)

plasticity Power consumption per device/circuit Scalabiiltydevice with low power consumption (nW/device), 2) to build athe learning. Fourth, power consumption per device should be

Kim, Kyunghyun

2013-01-01T23:59:59.000Z

271

PULSED INDICATOR CIRCUIT  

DOE Patents (OSTI)

A system is given for detecting incremental changes in a transducer impedance terminating a transmission line. Principal novelty resides in the transducer impedance terminating the line in a mismatch and a pulse generator being provided to apply discrete pulses to the input end of the line. The amplitudes of the pulses reflected to the input end of the line from the mismatched transducer impedance are then observed as a very accurate measure of the instantaneous value of the latter.

Linlor, W.I.; Kerns, Q.A.

1960-11-15T23:59:59.000Z

272

Efficient circuit partitioning to extend cycle simulation beyond synchronous circuits  

Science Conference Proceedings (OSTI)

Cycle simulation techniques, such as levelized compiled code, can ordinarily be applied only to synchronous designs. They usually cannot be applied to designs containing circuit features like combinational paths, multiple clock domains, generated clocks, ... Keywords: logic simulation, cycle simulation, circuit partitioning, levelized compiled code

Charles J. DeVane

1997-11-01T23:59:59.000Z

273

ELECTRONIC INTEGRATING CIRCUIT  

DOE Patents (OSTI)

An electronic integrating circuit using a transistor with a capacitor connected between the emitter and collector through which the capacitor discharges at a rate proportional to the input current at the base is described. Means are provided for biasing the base with an operating bias and for applying a voltage pulse to the capacitor for charging to an initial voltage. A current dividing diode is connected between the base and emitter of the transistor, and signal input terminal means are coupled to the juncture of the capacitor and emitter and to the base of the transistor. At the end of the integration period, the residual voltage on said capacitor is less by an amount proportional to the integral of the input signal. Either continuous or intermittent periods of integration are provided. (AEC)

Englemann, R.H.

1963-08-20T23:59:59.000Z

274

Development of Path 15 Software: Managing Power Transfer Constraints on a Major Transmission Interface: Path 15 of the California Transmission System with EPRI's DTCR Technology  

Science Conference Proceedings (OSTI)

In a previous research project, a dynamic thermal software model was developed and tested for the California Path 15 power transmission interface. A summary of that work is included in this report. The dynamic thermal model used real-time data from tension monitors on the critical Gates Panoche 230-kV lines. It also used continual updates of an automatic load and generation reduction scheme to calculate the post-contingency Path 15 power flow resulting from the loss of two 500-kV lines (double line outag...

2003-12-08T23:59:59.000Z

275

A "Single-Photon" Transistor in Circuit Quantum Electrodynamics  

E-Print Network (OSTI)

We introduce a circuit quantum electrodynamical setup for a "single-photon" transistor. In our approach photons propagate in two open transmission lines that are coupled via two interacting transmon qubits. The interaction is such that no photons are exchanged between the two transmission lines but a single photon in one line can completely block respectively enable the propagation of photons in the other line. High on-off ratios can be achieved for feasible experimental parameters. Our approach is inherently scalable as all photon pulses can have the same pulse shape and carrier frequency such that output signals of one transistor can be input signals for a consecutive transistor.

Lukas Neumeier; Martin Leib; Michael J. Hartmann

2012-11-30T23:59:59.000Z

276

Linear Circuits Designation: Required course  

E-Print Network (OSTI)

circuits. Node and mesh analysis. Operational amplifiers. Signal acquisition and conditioning. Electric, 11k). Objective 4: To acquaint students with the rudiments of electrical-to-mechanical energy) Steady-state and dynamic behavior of linear, lumped-parameter electrical circuits. Kirchoff's laws. RLC

Krstic, Miroslav

277

Online circuit breaker monitoring system  

E-Print Network (OSTI)

Circuit breakers are used in a power system to break or make current flow through power system apparatus. Reliable operation of circuit breakers is very important to the well-being of the power system. Historically this is achieved by regular inspection and maintenance of the circuit breakers. An automated online circuit breaker monitoring system is proposed to monitor condition, operation and status of high and medium voltage circuit breakers. By tracking equipment condition, this system could be used to perform maintenance only when it is needed. This could decrease overall maintenance cost and increase equipment reliability. Using high accurate time synchronization, this system should enable development of system-wide applications that utilize the data recorded by the system. This makes possible tracking sequence of events and making conclusions about their effect on-line. This solution also enables reliable topology analysis, which can be used to improve power flow analysis, state estimation and alarm processing.

Djekic, Zarko

2007-12-01T23:59:59.000Z

278

Resonant Tunneling Device Logic Circuits  

E-Print Network (OSTI)

This report is a summary of the activities in the field of resonant tunneling device circuit design. The presented work has been performed by the Department of Microelectronics of the University of Dortmund (UNIDO) and the Solid-State Electronics Department of the Gerhard-Mercator University of Duisburg (GMUD) during the first year of the Microelectronics Advanced Research Initiative projects ANSWERS (Autonomous Nanoelectronic Systems with Extended Replication and Signalling) and LOCOM (Logic Circuits with Reduced Complexity based on Devices with Higher Functionality). As part of the ANSWERS work-package the principal task of UNIDO is to investigate novel logic circuit architectures for resonant tunneling devices, to perform circuit simulations, and to specify the electrical device parameters. The basic device configuration is a monolithically integrated resonant tunneling diode heterostructure field-effect transistor (RTD-HFET). This device and the demonstrator circuits are fabricated by the LOCOM partner GMUD.

Christian Pacha; Peter Glösekötter; Karl Goser; Werner Prost; Uwe Auer; Franz-J. Tegude

1999-01-01T23:59:59.000Z

279

Distribution Green Circuits Collaboration  

Science Conference Proceedings (OSTI)

Electric power transmission and distribution (T&D) systems typically have aggregate annual energy losses of 710%. The percentage losses across all U.S. T&D equate to approximately 300 million MWh based on a U.S. annual generation total of 4,157 million MWh according to the Energy Information Administration. Because these losses are inherent in the process, they cannot be reduced to zero but might be reduced significantly with present technology. Approximately two-thirds of these losses are incurred at th...

2010-03-31T23:59:59.000Z

280

Interruptible Physical Transmission Contracts for Congestion Management  

E-Print Network (OSTI)

risk neutral with respect to any unexpected equipment outages, This risk is automatically born high [8]. Second, the transaction and information cost to traders may be very high [5]. Third, markets and equipment outage uncertainty. One of the ways to circumvent these uncertainties and project the price

Ilic, Marija D.

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Interconnect Coupling Noise in CMOS VLSI Circuits  

E-Print Network (OSTI)

Interconnect between a CMOS driver and re- ceiver can be modeled as a 1ossy transmission line in high speed CMOS VLSI circuits as transition times become comparable to or less than the time of flight delay of the signal through the low resistivity interconnect. In this paper, closed form expressions for the coupling noise between adjacent interconnect are presented to estimate the coupling noise voltage on a quiet line. These expressions are based on an assumption that the interconnections are loosely coupled, where the effect of the coupling noise on the waveform of the active line is small and can be ne- glected. It is demonstrated that the output impedance of the CMOS driver should preferably be comparable to the interconnect impedance in order to reduce the propagation delay of the CMOS driver stage.

Kevin T. Tang; Eby G. Friedman

1999-01-01T23:59:59.000Z

282

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

283

Regulations for Electric Transmission and Fuel Gas Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long...

284

Generating Single Microwave Photons in a Circuit  

E-Print Network (OSTI)

Electromagnetic signals in circuits consist of discrete photons, though conventional voltage sources can only generate classical fields with a coherent superposition of many different photon numbers. While these classical signals can control and measure bits in a quantum computer (qubits), single photons can carry quantum information, enabling non-local quantum interactions, an important resource for scalable quantum computing. Here, we demonstrate an on-chip single photon source in a circuit quantum electrodynamics (QED) architecture, with a microwave transmission line cavity that collects the spontaneous emission of a single superconducting qubit with high efficiency. The photon source is triggered by a qubit rotation, as a photon is generated only when the qubit is excited. Tomography of both qubit and fluorescence photon shows that arbitrary qubit states can be mapped onto the photon state, demonstrating an ability to convert a stationary qubit into a flying qubit. Both the average power and voltage of the photon source are characterized to verify performance of the system. This single photon source is an important addition to a rapidly growing toolbox for quantum optics on a chip.

A. A. Houck; D. I. Schuster; J. M. Gambetta; J. A. Schreier; B. R. Johnson; J. M. Chow; J. Majer; L. Frunzio; M. H. Devoret; S. M. Girvin; R. J. Schoelkopf

2007-02-27T23:59:59.000Z

285

EA-1899: Rerouting and Renovating of Estes-Flatiron Three Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Rerouting and Renovating of Estes-Flatiron Three Transmission Lines to Double Circuit 115-kV, Larimer County, Colorado EA-1899: Rerouting and Renovating of Estes-Flatiron Three...

286

DOE Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop November 1, 2012 Federal Energy Regulatory Commission Commissioner Cheryl LaFleur 1 FERC's Transmission Efforts Reliability and Grid Security Planning...

287

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Usage Transmission Transmission Once electricity is generated -- whether by burning fossil fuels; through nuclear fission; or by harnessing wind, solar, geothermal, or hydro...

288

Merchant transmission investment  

E-Print Network (OSTI)

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

289

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

290

Overpulse railgun energy recovery circuit  

DOE Patents (OSTI)

The invention presented relates to a high-power pulsing circuit and more particularly to a repetitive pulse inductive energy storage and transfer circuit for an electromagnetic launcher. In an electromagnetic launcher such as a railgun for propelling a projectile at high velocity, an overpulse energy recovery circuit is employed to transfer stored inductive energy from a source inductor to the railgun inductance to propel the projectile down the railgun. Switching circuitry and an energy transfer capacitor are used to switch the energy back to the source inductor in readiness for a repetitive projectile propelling cycle.

Honig, E.M.

1984-09-28T23:59:59.000Z

291

Counterpulse railgun energy recovery circuit  

DOE Patents (OSTI)

The invention presented relates to a high-power pulsing circuit and more particularly to a repetitive pulse inductive energy storage and transfer circuit for an electromagnetic launcher. In an electromagnetic launcher such as a railgun for propelling a projectile at high velocity, a counterpulse energy recovery circuit is employed to transfer stored inductive energy from a source inductor to the railgun inductance to propel the projectile down the railgun. Switching circuitry and an energy transfer capacitor are used to switch the energy back to the source inductor in readiness for a repetitive projectile propelling cycle.

Honig, E.M.

1984-09-28T23:59:59.000Z

292

Electronic circuit for measuring series connected ...  

An electronic circuit for measuring voltage signals in an energy storage device is disclosed. The electronic circuit includes a plurality of energy storage cells ...

293

Circuit Breaker Component and Subsystem Performance Maintenance Insights for Pumps and Compressors  

Science Conference Proceedings (OSTI)

This technical update presents initial results of investigations of issues concerning transmission-class circuit breaker pump and compressor maintenance and possible improvements in materials and practices that could improve maintenance effectiveness.The life-cycle performance of a high-voltage circuit breaker is, to a large degree, determined by the performance of the materials and components that make up the complete breaker. The rates of deterioration of components such as compressors ...

2012-12-13T23:59:59.000Z

294

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota  

Energy.gov (U.S. Department of Energy (DOE))

The USDA Rural Utilities Service, with DOE’s Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota.

295

Global Circuit Model with Clouds  

Science Conference Proceedings (OSTI)

Cloud data from the International Satellite Cloud Climatology Project (ISCCP) database have been introduced into the global circuit model developed by Tinsley and Zhou. Using the cloud-top pressure data and cloud type information, the authors ...

Limin Zhou; Brian A. Tinsley

2010-04-01T23:59:59.000Z

296

Battery charging and testing circuit  

SciTech Connect

A constant current battery charging circuit is provided by which the battery receives a full charge until the battery voltage reaches a threshold. When the battery voltage is above the threshold, the battery receives a trickle charge. The actual battery voltage is compared with a reference voltage to determine whether the full charge circuit should be in operation. Hysteresis is provided for preventing a rapid on/off operation around the threshold. The reference voltage is compensated for temperature variations. The hysteresis system and temperature compensation system are independent of each other. A separate test circuit is provided for testing the battery voltage. During testing of the battery, the full charge circuit is inoperative.

Wicnienski, M. F.; Charles, D. E.

1984-01-17T23:59:59.000Z

297

Cooperative Transmission in a Wireless Cluster based on Flow Management  

E-Print Network (OSTI)

In this paper, a cooperative transmission design for a general multi-node half-duplex wireless cluster network is presented. It is assumed that the nodes operate in half-duplex mode and that channel information is available at the nodes. The proposed design involves solving a convex flow optimization problem on a graph that models the cluster network. A much simpler generalized-link selection protocol based on the above design is also presented. Both the proposed flow-optimized protocol and the generalized-link selection protocol are shown to achieve the optimal diversity-multiplexing tradeoff (DMT) for the cluster network. Moreover, simulation results are presented to quantify the gap between the performances of the proposed protocols and that of a max-flow-min-cut type bound, in terms of outage probability.

Chatterjee, Debdeep; Lok, Tat M

2009-01-01T23:59:59.000Z

298

Reverse engineering of integrated circuits  

DOE Patents (OSTI)

Software and a method therein to analyze circuits. The software comprises several tools, each of which perform particular functions in the Reverse Engineering process. The analyst, through a standard interface, directs each tool to the portion of the task to which it is most well suited, rendering previously intractable problems solvable. The tools are generally used iteratively to produce a successively more abstract picture of a circuit, about which incomplete a priori knowledge exists.

Chisholm, Gregory H. (Shorewood, IL); Eckmann, Steven T. (Colorado Springs, CO); Lain, Christopher M. (Pittsburgh, PA); Veroff, Robert L. (Albuquerque, NM)

2003-01-01T23:59:59.000Z

299

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

300

Independent transmission company (ITC) and markets for transmission  

E-Print Network (OSTI)

Independent Abstract-- transmission company (ITC) and markets for transmission Yong T. Yoon Marija a fundamental structure for the transmission provider (TP) composed of the independent transmission company (ITC out the associated functions including managing transmission congestion. At the minimum

Ilic, Marija D.

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Three essays concerning information transmission  

E-Print Network (OSTI)

Transmissionas an Information-Transmission Mechanism,” American EconomicConcerning Information Transmission A dissertation submitted

Boone, Johnathan

2010-01-01T23:59:59.000Z

302

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

303

Interactive Transmission Line Computer Program for Undergraduate Teaching  

E-Print Network (OSTI)

Distributed-circuit analysis using transmission lines is a standard topic in undergraduate education in electrical engineering and computer engineering. This paper presents a simple menu-driven program that students can use to explore the behavior of transmission line circuits, and as a computational laboratory for verifying their solutions to homework problems. At the introductory level the program demonstrates traveling waves and standing waves. Smith-chart calculations of impedance and reflection coefficient can be associated with the standing-wave pattern on the transmission line. A branching circuit can be solved, including impedance matching with a quarter-wave transformer. At the intermediate level, students can use the program to test their designs for two- and three-step Chebyshev transformers, and for impedance matching using single, double and triple-stub circuits. The program makes easy the calculation of the bandwidth of a design by displaying the return loss or transmission loss as a function of frequency. Low-pass and bandstop filters can be solved. The program encourages students to explore the behavior of the voltages and currents on the lines as the frequency is changed to gain insight into the operation of transformers, matching schemes and filters.

Christopher W. Trueman

2000-01-01T23:59:59.000Z

304

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

305

Faster Quantum Number Factoring via Circuit Synthesis  

E-Print Network (OSTI)

A major obstacle to implementing Shor's quantum number-factoring algorithm is the large size of modular-exponentiation circuits. We reduce this bottleneck by customizing reversible circuits for modular multiplication to individual runs of Shor's algorithm. Our circuit-synthesis procedure exploits spectral properties of multiplication operators and constructs optimized circuits from the traces of the execution of an appropriate GCD algorithm. Empirically, gate counts are reduced by 4-5 times, and circuit latency is reduced by larger factors.

Igor L. Markov; Mehdi Saeedi

2013-01-15T23:59:59.000Z

306

Short-Term Energy Outlook Supplement: 2013 Outlook for Gulf of Mexico Hurricane-Related Production Outages  

U.S. Energy Information Administration (EIA) Indexed Site

2013 Outlook for Gulf of Mexico 2013 Outlook for Gulf of Mexico Hurricane-Related Production Outages June 2013 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | STEO Supplement: 2013 Hurricane Outlook i This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other federal agencies. June 2013 U.S. Energy Information Administration | STEO Supplement: 2013 Hurricane Outlook 1

307

2304 IEEE TRANSACTIONS ON INFORMATION THEORY, VOL. 55, NO. 5, MAY 2009 Service-Outage-Based Power and Rate Control for  

E-Print Network (OSTI)

and the receiver and use the channel state information (CSI) to dynamically adapt transmit power and rate according function. The service-outage-based power and rate allocation problem is stated below. In the following, we.g., wireless RF communication, dynamic allocation of resources, e.g., transmit power and in- formation rate

Franceschetti, Massimo

308

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

309

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

310

Arnold Schwarzenegger TRANSMISSION BENEFIT  

E-Print Network (OSTI)

California Edison's (SCE) initial Tehachapi transmission trunk-line proposal for integration of wind. The Tehachapi Transmission Project to integrate 4,500 MW of renewable wind energy has since been approved after

311

Circuit breaker lock out assembly  

DOE Patents (OSTI)

A lock out assembly for a circuit breaker which consists of a generally step-shaped unitary base with an aperture in the small portion of the step-shaped base and a roughly S shaped retaining pin which loops through the large portion of the step-shaped base. The lock out assembly is adapted to fit over a circuit breaker with the handle switch projecting through the aperture, and the retaining pin projecting into an opening of the handle switch, preventing removal.

Gordy, W.T.

1983-05-18T23:59:59.000Z

312

Circuit breaker lock out assembly  

Science Conference Proceedings (OSTI)

A lock out assembly for a circuit breaker which consists of a generally step-shaped unitary base with an aperture in the small portion of the step-shaped base and a roughly "S" shaped retaining pin which loops through the large portion of the step-shaped base. The lock out assembly is adapted to fit over a circuit breaker with the handle switch projecting through the aperture, and the retaining pin projecting into an opening of the handle switch, preventing removal.

Gordy, Wade T. (Jackson, SC)

1984-01-01T23:59:59.000Z

313

Sensor/source electrometer circuit  

DOE Patents (OSTI)

A multiple decade electrometer circuit is claimed which can measure low input currents or act as a current source and is comprised of a microprocessor controlled digital to analog converters to derive individual decades. A plurality of decades are created by multiple D-A voltage sources which generate electrometer currents through scaled resistors. After a first series of decades of current are successively produced, the converters are 10 cycled to generate current through new resistors scaled to produce another series decades of current. In this manner, the electrometer circuit generates or senses a plurality of decades of current without significant scale change.

Hughes, W.J.

1991-12-31T23:59:59.000Z

314

Transmission Investment Incentives  

Science Conference Proceedings (OSTI)

This report documents the use of agent-based simulation as a tool for studying transmission investment incentives, and it is meant to illuminate what accounts for the difficulties in aligning incentives for enhancing the transmission system. The report suggests that a new method of calculation for bid optimization be applied to the economic analysis of long-term incentives for transmission investment. This technology can be broadly applied to help negotiators in transmission planning quantify their count...

2006-12-21T23:59:59.000Z

315

Prospects for Strong Cavity Quantum Electrodynamics with Superconducting Circuits  

E-Print Network (OSTI)

We propose a realizable architecture using one-dimensional transmission line resonators to reach the strong coupling limit of cavity quantum electrodynamics in superconducting electrical circuits. The vacuum Rabi frequency for the coupling of cavity photons to quantized excitations of an adjacent electrical circuit (qubit) can easily exceed the damping rates of both the cavity and the qubit. This architecture is attractive for quantum computing and control, since it provides strong inhibition of spontaneous emission, potentially leading to greatly enhanced qubit lifetimes, allows high-fidelity quantum non-demolition measurements of the state of multiple qubits, and has a natural mechanism for entanglement of qubits separated by centimeter distances. In addition it would allow production of microwave photon states of fundamental importance for quantum communication.

S. M. Girvin; Ren-Shou Huang; Alexandre Blais; Andreas Wallraff; R. J. Schoelkopf

2003-10-28T23:59:59.000Z

316

Field Guide Updates for 2011: Volume 1 - Compressors for High-Voltage Circuit Breakers, Volume 2 - Lubrication of High-Voltage Circu it Breakers  

Science Conference Proceedings (OSTI)

High-voltage circuit breakers (HVCBs) perform essential protection and control functions on power transmission networks. Circuit breakers have multiple components that must operate in concert in order for the breaker to perform properly. If one component, such as the air or hydraulic system, does not operate correctly, the circuit breaker may misoperate or fail, possibly resulting in equipment damage or an outageboth expensive consequences. To help utilities prevent such undesirable events, this field gu...

2011-12-12T23:59:59.000Z

317

Wavelet based analysis of circuit breaker operation  

E-Print Network (OSTI)

Circuit breaker is an important interrupting device in power system network. It usually has a lifetime about 20 to 40 years. During breaker's service time, maintenance and inspection are imperative duties to achieve its reliable operation. To automate the diagnostic practice for circuit breaker operation and reduce the utility company's workload, Wavelet based analysis software of circuit breaker operation is developed here. Combined with circuit breaker monitoring system, the analysis software processes the original circuit breaker information, speeds up the analysis time and provides stable and consistent evaluation for the circuit breaker operation.

Ren, Zhifang Jennifer

2006-05-01T23:59:59.000Z

318

Battery charger polarity circuit control  

SciTech Connect

A normally open polarity sensing circuit is interposed between the charging current output of a battery charger and battery terminal clamps connected with a rechargeable storage battery. Normally open reed switches, closed by battery positive terminal potential, gates silicon controlled recitifiers for battery charging current flow according to the polarity of the battery.

Santilli, R.R.

1982-11-30T23:59:59.000Z

319

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

320

Re: Potomac River Generating Station Department of Energy, Case No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

evised plan for evised plan for transmission outages for the 230 kV circuits Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Docket No. EO-05-01. Order No. 202-07-02: Potomac Electric Power Company ("Pepco") is providing you with the following information regarding the revised plan for transmission outages for the 230 kV circuits that are scheduled during the upcoming months. In accordance with its internal procedures developed pursuant to the December 20, 2005 order in the above-captioned proceeding, Order No. 202-05-03, and pursuant to the expanded notice required in Order No. 202-07-02, issued on January 31 Order, Pepco will provide advance notification of the outages to Mirant,

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Automated manual transmission controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

322

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

323

From devil to angel, transmission lines boost parallel computing of linear resistor networks  

E-Print Network (OSTI)

Transmission line is always big trouble for integrated circuits designers; however, it could be of great help to the parallel computing of extremely large linear resistor networks. In this paper, we introduce the virtual transmission method (VTM), which brings virtual transmission lines into linear resistor networks to achieve distributed and asynchronous parallel computing in the virtual time domain. Numerical experiments show that VTM could be efficiently running on the 2D or 3D microprocessor with arbitrary number of cores.

Wei, Fei

2009-01-01T23:59:59.000Z

324

Definition: Transmission Service Provider | Open Energy Information  

Open Energy Info (EERE)

Transmission Service Provider The entity that administers the transmission tariff and provides Transmission Service to Transmission Customers under applicable...

325

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications 2013 Transmission Reliability Program Peer Review - Day 1...

326

Vertical Circuits Inc | Open Energy Information  

Open Energy Info (EERE)

Circuits Inc Circuits Inc Jump to: navigation, search Name Vertical Circuits, Inc. Place Scotts Valley, California Zip 95066 Sector Services Product Vertical Circuits Inc. is a global supplier of advanced die level vertical interconnect packaging technology, products, services and intellectual property for the manufacture of low cost ultra high-speed/high-density semiconductor components. References Vertical Circuits, Inc.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Vertical Circuits, Inc. is a company located in Scotts Valley, California . References ↑ "Vertical Circuits, Inc." Retrieved from "http://en.openei.org/w/index.php?title=Vertical_Circuits_Inc&oldid=352802"

327

Post regulation circuit with energy storage  

DOE Patents (OSTI)

A charge regulation circuit provides regulation of an unregulated voltage supply and provides energy storage. The charge regulation circuit according to the present invention provides energy storage without unnecessary dissipation of energy through a resistor as in prior art approaches.

Ball, Don G. (Livermore, CA); Birx, Daniel L. (Oakley, CA); Cook, Edward G. (Livermore, CA)

1992-01-01T23:59:59.000Z

328

Quantum Circuit Simulation, 1st edition  

Science Conference Proceedings (OSTI)

Quantum Circuit Simulation covers the fundamentals of linear algebra and introduces basic concepts of quantum physics needed to understand quantum circuits and algorithms. It requires only basic familiarity with algebra, graph algorithms and computer ...

George F. Viamontes; Igor L. Markov; John P. Hayes

2009-12-01T23:59:59.000Z

329

Dual-circuit segmented rail phased induction motor - Energy ...  

An improved linear motor utilizes two circuits, rather that one circuit and an opposed plate, to gain efficiency. The powered circuit is a flat conductive coil. The ...

330

ENHANCEMENT OF ORGANIC PHOTOVOLTAIC CELL OPEN CIRCUIT ...  

enhancement of organic photovoltaic cell open circuit voltage using electron/hole blocking exciton blocking layers united states patent application

331

Hayden-Blue River 345-kV transmission line project, Colorado  

SciTech Connect

Tri-State Generation and Transmission Association, Inc., Colorado-Ute Electric Association, Inc., Platte River Power Authority, and Western Area Power Administration propose to construct and operate approximately 90 miles of 345-kilovolt (kV) transmission line between Hayden and the Blue River Valley in Colorado. The project would involve expansion of existing substation facilities at Hayden and construction of two new substations. The line would be operated at 230 kV initially. Estimated cost of the project is $37.8 million. The new line and substation facilities would provide a backup transmission path, satisfy the long-term needs in meeting the energy requirements, improve system reliability, improve system stability for the Craig and Hayden generating stations, and leave the existing 115-kV and 138-kV lines in operation to provide additional transmission capacity that would function as backup transmission during an outage on another line. Minute amounts of lands would be displaced. Construction activities would disturb critical ranges for elk and mule deer, elk calving areas, and the mating and nesting areas of greater sandhill cranes, great blue herons, sage grouse, golden eagles, and prairie falcons. Management of timberland would damage natural vegetation. The line would traverse 3.1 miles of flood-prone area, and as many as three transmission towers would lie within the floodplain of the Colorado River. The visual quality of land crossed by the line would be degraded somewhat.

Not Available

1982-09-01T23:59:59.000Z

332

NPTEL Syllabus Basic Electrical Circuits -Video course  

E-Print Network (OSTI)

with an introduction to basic linear elements used in electrical circuits. Mesh and node analysis for systematic and energy in circuits will be discussed. Rudiments of three-phase circuits and their analysis; Energy in a mutual inductor and constraint on mutual inductance 5 Nodal analysis of a network

Krishnapura, Nagendra

333

Ionization tube simmer current circuit  

DOE Patents (OSTI)

A highly efficient flash lamp simmer current circuit utilizes a fifty percent duty cycle square wave pulse generator to pass a current over a current limiting inductor to a full wave rectifier. The DC output of the rectifier is then passed over a voltage smoothing capacitor through a reverse current blocking diode to a flash lamp tube to sustain ionization in the tube between discharges via a small simmer current. An alternate embodiment of the circuit combines the pulse generator and inductor in the form of an FET off line square wave generator with an impedance limited step up output transformer which is then applied to the full wave rectifier as before to yield a similar simmer current.

Steinkraus, Jr., Robert F. (Livermore, CA)

1994-01-01T23:59:59.000Z

334

Ionization tube simmer current circuit  

DOE Patents (OSTI)

A highly efficient flash lamp simmer current circuit utilizes a fifty percent duty cycle square wave pulse generator to pass a current over a current limiting inductor to a full wave rectifier. The DC output of the rectifier is then passed over a voltage smoothing capacitor through a reverse current blocking diode to a flash lamp tube to sustain ionization in the tube between discharges via a small simmer current. An alternate embodiment of the circuit combines the pulse generator and inductor in the form of an FET off line square wave generator with an impedance limited step up output transformer which is then applied to the full wave rectifier as before to yield a similar simmer current. 6 figures.

Steinkraus, R.F. Jr.

1994-12-13T23:59:59.000Z

335

Condition responsive battery charging circuit  

SciTech Connect

A battery charging circuit includes a ferroresonant transformer having a rectified output for providing a constant output voltage to be supplied to a battery to be charged. Battery temperature is sensed providing an input to a control circuit which operates a shunt regulator associated with the ferroresonant transformer to provide battery charge voltage as a function of battery temperature. In response to a high battery temperature the controller functions to lower the output voltage to the battery, and in response to a low battery temperature, operates to provide a higher output voltage, with suitable control for any battery temperature between minus 10* and plus 150* fahrenheit. As the battery approaches full charge and battery acceptance current falls below a predetermined level, a charge cycle termination control allows charging to continue for a period preset by the operator, at the end of which period, line voltage is removed from the charger thereby terminating the charge cycle.

Reidenbach, S.G.

1980-06-24T23:59:59.000Z

336

Delta connected resonant snubber circuit  

SciTech Connect

A delta connected, resonant snubber-based, soft switching, inverter circuit achieves lossless switching during dc-to-ac power conversion and power conditioning with minimum component count and size. Current is supplied to the resonant snubber branches solely by the dc supply voltage through the main inverter switches and the auxiliary switches. Component count and size are reduced by use of a single semiconductor switch in the resonant snubber branches. Component count is also reduced by maximizing the use of stray capacitances of the main switches as parallel resonant capacitors. Resonance charging and discharging of the parallel capacitances allows lossless, zero voltage switching. In one embodiment, circuit component size and count are minimized while achieving lossless, zero voltage switching within a three-phase inverter.

Lai, Jih-Sheng (Knoxville, TN); Peng, Fang Zheng (Oak Ridge, TN); Young, Sr., Robert W. (Oak Ridge, TN); Ott, Jr., George W. (Knoxville, TN)

1998-01-01T23:59:59.000Z

337

Delta connected resonant snubber circuit  

DOE Patents (OSTI)

A delta connected, resonant snubber-based, soft switching, inverter circuit achieves lossless switching during dc-to-ac power conversion and power conditioning with minimum component count and size. Current is supplied to the resonant snubber branches solely by the dc supply voltage through the main inverter switches and the auxiliary switches. Component count and size are reduced by use of a single semiconductor switch in the resonant snubber branches. Component count is also reduced by maximizing the use of stray capacitances of the main switches as parallel resonant capacitors. Resonance charging and discharging of the parallel capacitances allows lossless, zero voltage switching. In one embodiment, circuit component size and count are minimized while achieving lossless, zero voltage switching within a three-phase inverter. 36 figs.

Lai, J.S.; Peng, F.Z.; Young, R.W. Sr.; Ott, G.W. Jr.

1998-01-20T23:59:59.000Z

338

Control circuit for combustion systems  

SciTech Connect

A control circuit is described for gas fired burners and the like such as are employed in commercial laundry fabric ironers requiring the energization of a blower motor and the resulting opening of a gas valve and ignition of a gas burner only after an air pressure sensitive switch is actuated through the operation of the blower motor for purging the system of combustible gases.

Kamberg, E.

1981-11-10T23:59:59.000Z

339

Counterpulse railgun energy recovery circuit  

SciTech Connect

In an electromagnetic launcher such as a railgun for propelling a projectile at high velocity, a counterpulse energy recovery circuit is employed to transfer stored inductive energy from a source inductor to the railgun inductance to propel the projectile down the railgun. Switching circuitry and an energy transfer capacitor are used to switch the energy back to the source inductor in readiness for a repetitive projectile propelling cycle.

Honig, Emanuel M. (Los Alamos, NM)

1986-01-01T23:59:59.000Z

340

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

CONTROL AND FAULT DETECTOR CIRCUIT  

DOE Patents (OSTI)

A power control and fault detectcr circuit for a radiofrequency system is described. The operation of the circuit controls the power output of a radio- frequency power supply to automatically start the flow of energizing power to the radio-frequency power supply and to gradually increase the power to a predetermined level which is below the point where destruction occurs upon the happening of a fault. If the radio-frequency power supply output fails to increase during such period, the control does not further increase the power. On the other hand, if the output of the radio-frequency power supply properly increases, then the control continues to increase the power to a maximum value. After the maximumn value of radio-frequency output has been achieved. the control is responsive to a ''fault,'' such as a short circuit in the radio-frequency system being driven, so that the flow of power is interrupted for an interval before the cycle is repeated.

Winningstad, C.N.

1958-04-01T23:59:59.000Z

342

Electrical circuit for data reduction  

DOE Patents (OSTI)

This invention is comprised of an electrical circuit for determining characteristic voltages, such as maximum, minimum, average and root mean squared voltages, of a time-varying electrical signal. The circuit comprises a positive and a negative peak detector that feed the positive and negative voltage peaks detected in each of a series of time intervals into a solid-state multiplexer controlled by a process controller. The time intervals are generated by the process controller in combination with a clocking, circuit. The multiplexer applies the positive and negative peak voltages to a set of four capacitors, apply the positive peak to one capacitor during one interval and then the negative peak to that capacitor in a subsequent interval so that each capacitor is alternatingly accumulating a positive peak then a negative peak to obviate the need for resetting each capacitor. After the positive peak voltage is applied to one capacitor, the connection is switched during the next interval for reading the negative peak voltage, then switched again for applying, a negative peak voltage, then switched once more for reading the negative peak voltage, the multiplexer serving, as a solid state commutator for switching the electrical connection. Alternatively, peak maximum and minimum voltage detectors may be replaced with circuitry designed to obtain the additional characteristic voltages desired in each interval.

Kronberg, J.W.

1991-12-31T23:59:59.000Z

343

Video Transmission Jerkiness Measure.  

E-Print Network (OSTI)

??Digital video transmission is widely used nowadays in multimedia. Frame dropping, freeze and reduced number of frames in the transmitted video are common symptoms of… (more)

Abdelsamad, Deena

2013-01-01T23:59:59.000Z

344

NIST Transmission SEM  

Science Conference Proceedings (OSTI)

... As a result, more electrons will scatter, to provide the ... RR Keller, "Transmission EBSD in the Scanning Electron Microscope," Microscopy Today vol. ...

2013-07-29T23:59:59.000Z

345

Patterns of transmission investment  

E-Print Network (OSTI)

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

346

An Analysis of loss of Decay Heat Removal Trends and Initialing Event Frequencies (1989-1988): Outage Risk Assessment and Management (ORAM) Technology  

Science Conference Proceedings (OSTI)

Operating experience shows that U.S. nuclear industry initiatives have been effective at reducing the frequency and severity of reactor coolant system loss of inventory and decay heat removal incidents during shutdown. This report -- part of EPRI's Outage Risk Assessment and Management (ORAM) technology transfer efforts -- documents operating experience from 1989-1998 and compiles initiating event frequency and recovery probabilities for use in support of probabilistic shutdown safety studies.

1999-10-20T23:59:59.000Z

347

An Analysis of Loss of Decay Heat Removal Trends and Initiating Event Frequencies (1989 - 2000): Outage Risk Assessment and Manageme nt (ORAM) Technology  

Science Conference Proceedings (OSTI)

Operating experience shows that U.S. nuclear industry initiatives have been effective at reducing the long-term frequency and severity of reactor coolant system loss of inventory and decay heat removal incidents during shutdown. This report -- part of EPRI's Outage Risk Assessment and Management (ORAM (TM)) technology transfer efforts -- documents operating experience from 1989-2000 and compiles initiating event frequency and recovery probabilities for use in support of probabilistic shutdown safety stud...

2001-11-30T23:59:59.000Z

348

Method of determining the open circuit voltage of a battery in a closed circuit  

SciTech Connect

The open circuit voltage of a battery which is connected in a closed circuit is determined without breaking the circuit or causing voltage upsets therein. The closed circuit voltage across the battery and the current flowing through it are determined under normal load and then a fractional change is made in the load and the new current and voltage values determined. The open circuit voltage is then calculated, according to known principles, from the two sets of values.

Brown, William E. (Walnut Creek, CA)

1980-01-01T23:59:59.000Z

349

Definition: Automated Distribution Circuit Switches | Open Energy  

Open Energy Info (EERE)

Circuit Switches Circuit Switches Jump to: navigation, search Dictionary.png Automated Distribution Circuit Switches Distribution circuit switches that can be operated automatically in response to control signals from local sensors, distribution automation systems, or grid control systems. Such switches can be installed as automated devices or existing equipment can be retrofitted with controls and communications. The degree of automation depends on the controls and communications system implemented. These switches can be opened or closed to isolate portions of a distribution circuit that has experienced a short circuit (fault), or must be taken out of service for maintenance or other operations. When used in combination, these switches can reroute power from other substations or nearby distribution circuits.[1]

350

Short Circuit Current Contribution for Different Wind Turbine Generator Types  

DOE Green Energy (OSTI)

An important aspect of wind power plant (WPP) impact studies is to evaluate the short circuit (SC) current contribution of the plant into the transmission network under different fault conditions. This task can be challenging to protection engineers due to the topology differences between different types of wind turbine generators (WTGs) and the conventional generating units. This paper represents simulation results for short circuit current contribution for different types of WTGs obtained through transient analysis using generic WTG models. The obtained waveforms are analyzed to explain the behavior, such as peak values and rate of decay, of the WTG. The effect of fault types and location, and the effect of the control algorithms of power converters on SC current contribution are investigated. It is shown that the response of the WPP to faults will vary based on the type of the installed WTGs. While in Type 1 and Type 2 WTGs, short circuit current will be determined by the physical characteristics of the induction generator, the contribu-tion of Type 3 and Type 4 WTG will be mostly characterized by the power converters control algorithms which are usually considered proprietary information by the wind turbine manufacturers.

Muljadi, E.; Samaan, Nader A.; Gevorgian, Vahan; Li, Jun; Pasupulati, Subbaiah

2010-09-28T23:59:59.000Z

351

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

80: Big Bend to Witten Transmission Line Project, South Dakota 80: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with DOE's Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download April 12, 2011

352

The progressive transmission disadvantage  

Science Conference Proceedings (OSTI)

The disadvantage of progressive transmission, compared to transmission in a single step, is analyzed for the high-rate case using a polytope that is self-similar under binary subdivision. This disadvantage is calculated to be 0.3424 dB or 0.057 bit compared ...

M. J. Durst

1997-01-01T23:59:59.000Z

353

FOR ELECTRIC POWER TRANSMISSION  

E-Print Network (OSTI)

A contract network extends the concept of a contract path to address the problem of loop flow and congestion in electric power transmission systems. A contract network option provides a well defined, internally consistent framework for assigning long-term capacity rights to a complicated electric transmission network. The contract network respects the special conditions induced by Kirchoff's Laws; accommodates thermal, voltage and contingency constraints on transmission capacity; and can be adopted without disturbing existing methods for achieving an economic power dispatch subject to these constraints. By design, a contract network would maintain short-run efficiency through optimal spot price determination of transmission prices. Through payment of congestion rentals, the contract network makes a long-term capacityright holder indifferent between delivery of the power or receipt of payments in a settlement system. And the contract network framework can support allocation of transmission capacity rights through a competitive bidding process. CONTRACT NETWORKS

William W. Hogan; William W. Hogan

1990-01-01T23:59:59.000Z

354

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

Science Conference Proceedings (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

355

Single transmission line interrogated multiple channel data acquisition system  

DOE Patents (OSTI)

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensor circuits each monitors a specific process variable and each transmits measurement values over a single transmission line to a master interrogating station when addressed by said master interrogating station. Typically, as many as 330 remote stations may be parallel connected to the transmission line which may exceed 7,000 feet. The interrogation rate is typically 330 stations/second. The master interrogating station samples each station according to a shared, charging transmit-receive cycle. All remote station address signals, all data signals from the remote stations/sensors and all power for all of the remote station/sensors are transmitted via a single continuous terminated coaxial cable. A means is provided for periodically and remotely calibrating all remote sensors for zero and span. A provision is available to remotely disconnect any selected sensor station from the main transmission line.

Fasching, George E. (Morgantown, WV); Keech, Jr., Thomas W. (Morgantown, WV)

1980-01-01T23:59:59.000Z

356

765kV Transmission line Voltage gradient  

E-Print Network (OSTI)

Corona ring Transmission lines Nowadays, due to the ever increasing energy consumption and power supply optimization, it is required to construct new power plants, substations and transmission lines. In Iran, also, because of increasing demand for electrical energy, for a significant power loss reduction in power transmission over long distances, and to construct high transmission lines that lead to reduction in the economic costs of transmission lines, the transmission lines must be considered at extra high voltage (EHV) levels. These EHV levels should be compared with the low voltage levels in order to extract the benefits. Therefore, in this paper, a review has been conducted on the types of 765 kV transmission lines used in different countries and a comparison between them and the low voltage levels have been performed. Accordingly, the advantages of EHV transmission lines are summarized. Finally, designing a line of 765 kV single-circuit with 6 conductors per bundle based on existing standards is presented.

unknown authors

2012-01-01T23:59:59.000Z

357

SAS Output  

Gasoline and Diesel Fuel Update (EIA)

B. U.S. Transformer Outages by Type and NERC region, 2012 Outage Type Eastern Interconnection TRE WECC Contiguous U.S. Circuit Outage Counts Automatic Outages (Sustained) 16.00 --...

358

Microsoft Word - PoRiver Project Schedule - Letter to DOE_042807.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2007 30, 2007 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Project Outage Schedule Clarification Dear Mr. Mansueti: I am writing to clarify the upcoming outage schedule for the Potomac River project and to explain certain discrepancies that are present in Pepco's most recent communications. 1 The monthly status report submitted to the Federal Energy Regulatory Commission ("FERC") on April 16, 2007 shows the upcoming outages for the two additional transmission circuits as May 1, 2007 through May 21, 2007 (Circuit 1) and as May 24, 2007 through June 21, 2007 (Circuit 2). In an e-mail sent by Steve Alexander on April 27, 2007, Pepco reflected the current outage schedule for Circuit 1.

359

Spectroscopy of a Qubit Array via a Single Transmission Line  

E-Print Network (OSTI)

Frequency-selective readout for superconducting qubits opens the way towards scaling qubit circuits up without increasing the number of measurement lines. Here we demonstrate the readout of an array of 7 flux qubits located on the same chip. Each qubit is placed near an individual lambda/4 resonator which, in turn, is coupled to a common microwave transmission line. We performed spectroscopy of all qubits and determined their parameters in a single measurement run.

Jerger, M; Macha, P; Huebner, U; Lukashenko, A; Il'ichev, E; Ustinov, A V

2011-01-01T23:59:59.000Z

360

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

The commercial development of water repellent coatings for high voltage transmission lines  

SciTech Connect

The purpose of the Cooperative Research and Development Agreement (CRADA) between UT-Battelle, LLC and Southwire Company was to jointly develop a low cost, commercially viable, water-repellant anti-icing coating system for high voltage transmission lines. Icing of power lines and other structures caused by freezing rain events occurs annually in the United States, and leads to severe and prolonged power outages. These outages cause untold economic and personal distress for many American families and businesses. Researchers at the Department of Energy?s Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee have previously developed a set of superhydrophobic coatings with remarkable anti-icing properties that could potentially be sprayed or painted onto high-tension power lines and pylons. These coatings drastically reduce ice accumulation on these structures during freezing rain events. The project involved obtaining technical input, supplies and test high voltage cables from Southwire, along with the joint development of anti-icing coating techniques, which would result in a commercial license agreement between Southwire and ORNL, and potentially other companies requiring water repellent anti-icing coatings.

Hunter, S. R. [ORNL] [ORNL; Daniel, A. [Southwire Company] [Southwire Company

2013-10-31T23:59:59.000Z

362

The commercial development of water repellent coatings for high voltage transmission lines  

SciTech Connect

The purpose of the Cooperative Research and Development Agreement (CRADA) between UT-Battelle, LLC and Southwire Company was to jointly develop a low cost, commercially viable, water-repellant anti-icing coating system for high voltage transmission lines. Icing of power lines and other structures caused by freezing rain events occurs annually in the United States, and leads to severe and prolonged power outages. These outages cause untold economic and personal distress for many American families and businesses. Researchers at the Department of Energy s Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee have previously developed a set of superhydrophobic coatings with remarkable anti-icing properties that could potentially be sprayed or painted onto high-tension power lines and pylons. These coatings drastically reduce ice accumulation on these structures during freezing rain events. The project involved obtaining technical input, supplies and test high voltage cables from Southwire, along with the joint development of anti-icing coating techniques, which would result in a commercial license agreement between Southwire and ORNL, and potentially other companies requiring water repellent anti-icing coatings.

Hunter, Scott Robert [ORNL] [ORNL

2013-10-01T23:59:59.000Z

363

Multiplexer and time duration measuring circuit  

DOE Patents (OSTI)

A multiplexer device is provided for multiplexing data in the form of randomly developed, variable width pulses from a plurality of pulse sources to a master storage. The device includes a first multiplexer unit which includes a plurality of input circuits each coupled to one of the pulse sources, with all input circuits being disabled when one input circuit receives an input pulse so that only one input pulse is multiplexed by the multiplexer unit at any one time.

Gray, Jr., James (Downers Grove, IL)

1980-01-01T23:59:59.000Z

364

Green Circuits: Distribution Efficiency Case Studies  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Green Circuits project was a collaborative effort of 22 utilities. The main goal of the project was to evaluate ways to improve distribution efficiency. Modeling, economic evaluations, and field trials formed the core of the research effort. To evaluate efficiency improvements, 66 circuit case studies were modeled and fine-tuned, based on field data. Field trials of voltage optimization were implemented on nine circuits. Detailed advanced metering infrastructu...

2011-10-14T23:59:59.000Z

365

Asynchronous logic circuits and sheaf obstructions  

E-Print Network (OSTI)

This article exhibits a particular encoding of logic circuits into a sheaf formalism. The central result of this article is that there exists strictly more information available to a circuit designer in this setting than exists in static truth tables, but less than exists in event-level simulation. This information is related to the timing behavior of the logic circuits, and thereby provides a ``bridge'' between static logic analysis and detailed simulation.

Robinson, Michael

2010-01-01T23:59:59.000Z

366

Sequential Circuit Testing: From DFT to SFT  

Science Conference Proceedings (OSTI)

Sequential circuit testing is an active research area due to its applicability, its practicality, and its complexity. This paper gives an overview of the sequential automatic test pattern generation approaches and the classical and more recent design-for-testability ... Keywords: logic testing, sequential circuit testing, DFT techniques, automatic test pattern generation, design-for-testability methods, synthesis-for-testability, SFT techniques, large sequential circuits, ATPG

R. M. Chou; K. K. Saluja

1997-01-01T23:59:59.000Z

367

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

368

Down hole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

369

Designing electricity transmission auctions  

E-Print Network (OSTI)

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

370

Downhole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2008-01-15T23:59:59.000Z

371

Transmission Electron Microscopy (TEM)  

Science Conference Proceedings (OSTI)

...Transmission electron microcopy (TEM) has been used since the 1950s to obtain very high resolution images of microstructures. As TEMs were enhanced to include features such as digitally scanned point beams and energy dispersive x-ray detectors

372

Cloud Transmissivities for Canada  

Science Conference Proceedings (OSTI)

Transmissivities are determined for different cloud types using nine years of hourly irradiance measurements under overcast skies at six Canadian stations. Values for individual stations and for pooled data using irradiances uncorrected for ...

J. A. Davies; M. Abdel-Wahab; J. E. Howard

1985-03-01T23:59:59.000Z

373

NIST Electromechanical Circuit Sets Record Beating ...  

Science Conference Proceedings (OSTI)

... NIST scientists plan to combine the new circuit ... its "ground state," or lowest-energy state ... could be manipulated for the applications mentioned above. ...

2011-10-14T23:59:59.000Z

374

Enhancing Open Circuit Voltage by Combining Thermoelectric ...  

Science Conference Proceedings (OSTI)

Enhancing Open Circuit Voltage by Combining Thermoelectric Materials and Dye -Sensitized Solar Cell in Series · Estimation of Compressive Strength of High ...

375

Optimising Circuit Design for Gravity Gold Recovery  

Science Conference Proceedings (OSTI)

Abstract Scope, To determine the optimal circuit configuration for gravity gold recovery ... Energy Management Planning, Following the ISO 50001 Draft Standard.

376

Circuit breaker monitoring application using wireless communication  

E-Print Network (OSTI)

Circuit breakers are used in the power system to break or make current flow through power apparatus. Reliable operation of circuit breakers is critical to the well- being of the power system and can be achieved by regular inspection and maintenance. A low-cost automated circuit breaker monitoring system is developed to monitor circuit breaker control signals. An interface is designed on top of which different local and system-wide applications can be developed which utilize the data recorded by the system. Some of the possible applications are proposed. Lab and field evaluation of the designed system is performed and results are presented.

Ved, Nitin

2005-12-01T23:59:59.000Z

377

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

378

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

379

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

380

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

382

Definition: Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Jump to: navigation, search Dictionary.png Transmission An interconnected group of lines and associated equipment for the movement or transfer of electric energy...

383

Sequential power-up circuit  

DOE Patents (OSTI)

A sequential power-up circuit for starting several electrical load elements in series to avoid excessive current surge, comprising a voltage ramp generator and a set of voltage comparators, each comparator having a different reference voltage and interfacing with a switch that is capable of turning on one of the load elements. As the voltage rises, it passes the reference voltages one at a time and causes the switch corresponding to that voltage to turn on its load element. The ramp is turned on and off by a single switch or by a logic-level electrical signal. The ramp rate for turning on the load element is relatively slow and the rate for turning the elements off is relatively fast. Optionally, the duration of each interval of time between the turning on of the load elements is programmable. 2 figs.

Kronberg, J.W.

1992-06-02T23:59:59.000Z

384

Sequential power-up circuit  

DOE Patents (OSTI)

A sequential power-up circuit for starting several electrical load elements in series to avoid excessive current surge, comprising a voltage ramp generator and a set of voltage comparators, each comparator having a different reference voltage and interfacing with a switch that is capable of turning on one of the load elements. As the voltage rises, it passes the reference voltages one at a time and causes the switch corresponding to that voltage to turn on its load element. The ramp is turned on and off by a single switch or by a logic-level electrical signal. The ramp rate for turning on the load element is relatively slow and the rate for turning the elements off is relatively fast. Optionally, the duration of each interval of time between the turning on of the load elements is programmable.

Kronberg, James W. (108 Independent Blvd., Aiken, SC 29801)

1992-01-01T23:59:59.000Z

385

Quantum transducer in circuit optomechanics  

E-Print Network (OSTI)

Mechanical resonators are macroscopic quantum objects with great potential. They couple to many different quantum systems such as spins, optical photons, cold atoms, and Bose Einstein condensates. It is however difficult to measure and manipulate the phonon state due to the tiny motion in the quantum regime. On the other hand, microwave resonators are powerful quantum devices since arbitrary photon state can be synthesized and measured with a quantum tomography. We show that a linear coupling, strong and controlled with a gate voltage, between the mechanical and the microwave resonators enables to create quantum phonon states, manipulate hybrid entanglement between phonons and photons and generate entanglement between two mechanical oscillators. In circuit quantum optomechanics, the mechanical resonator acts as a quantum transducer between an auxiliary quantum system and the microwave resonator, which is used as a quantum bus.

Didier, Nicolas; Blanter, Yaroslav M; Fazio, Rosario

2012-01-01T23:59:59.000Z

386

Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.  

Science Conference Proceedings (OSTI)

Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

387

Interconnection Transmission Planning: Awards | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and...

388

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

ColoradoTransmissionAgencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary...

389

Reduce power outages  

SciTech Connect

A case history shows the cost-effectiveness of doing a reliability study on a new, grassroots refinery constructed in Venezuela. Constructing grassroots refineries in developing countries pose many challenges, especially when considering electrical power and steam supplies. Without dependable electrical and steam sources, the refinery will not operate according to design expectations. Consequently, utility systems are critical and expensive challenges that must be considered early in design. Because of tighter operating budgets, refiners are equally interested in cutting out system overdesign. Redundant backup systems are damaging in capital and operating expenditures. Using reliability analysis techniques, designers can evaluate the reliability, availability and maintainability of operating systems. In the following example, a Venezuelan operating company used a reliability analysis to: assess onstream factors for the refinery`s power plant; identify critical equipment that have the greatest impact on available electrical and steam sources; and achieve a cost-effective equipment configuration that eliminates redundant backup systems. Results from the study allowed decision-makers to initiate objective plans and created an equipment-failure database that will service the refinery for its useful life.

Goyal, R. [BAPCO, Awali (Bahrain); Ramirez, R. [Corpoven S.A., Caracas (Venezuela)

1995-06-01T23:59:59.000Z

390

EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Summary Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69-kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing

391

EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

00: Granby Pumping Plant Switchyard-Windy Gap Substation 00: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Summary Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69-kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing

392

Millimeter-Wave Circuits for 60GHz and Beyond  

E-Print Network (OSTI)

simulated, and modeled transmission line propagation lossof unit length transmission line. . . . . . . . . . . .of a coplanar waveguide transmission line (CPW). . . . . .

Afshar, Bagher

2010-01-01T23:59:59.000Z

393

Electricity Transmission, A Primer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

394

Quantifying Dynamic Stability of Genetic Memory Circuits  

Science Conference Proceedings (OSTI)

Bistability/Multistability has been found in many biological systems including genetic memory circuits. Proper characterization of system stability helps to understand biological functions and has potential applications in fields such as synthetic biology. ... Keywords: Dynamic stability, genetic memory, gene circuit, dynamic noise margin.

Yong Zhang; Peng Li; Garng Huang

2012-05-01T23:59:59.000Z

395

A Mixed Heuristic for Circuit Partitioning  

Science Conference Proceedings (OSTI)

As general-purpose parallel computers are increasingly being used to speed up different VLSI applications, the development of parallel algorithms for circuit testing, logic minimization and simulation, HDL-based synthesis, etc. is currently a field of ... Keywords: Tabu Search, circuit partitioning, optimisation, parallel test pattern generation, simulated annealing

C. Gil; J. Ortega; M. G. Montoya; R. Baños

2002-12-01T23:59:59.000Z

396

Multistable Circuits for Analog Memories Implementation  

Science Conference Proceedings (OSTI)

In this work two multistable circuits suitable for analog memories implementation will be presented. These circuits have been used to implement completely asynchronous analog memories, one type based on a flash converter and thus having a linear complexity ... Keywords: analog memories, asynchronous converters, successive approximations

Giorgio Biagetti; Massimo Conti; Simone Orcioni

2004-04-01T23:59:59.000Z

397

Experimentally driven verification of synthetic biological circuits  

Science Conference Proceedings (OSTI)

We present a framework that allows us to construct and formally analyze the behavior of synthetic gene circuits from specifications in a high level language used in describing electronic circuits. Our back-end synthesis tool automatically generates genetic-regulatory ...

Boyan Yordanov; Evan Appleton; Rishi Ganguly; Ebru Aydin Gol; Swati Banerjee Carr; Swapnil Bhatia; Traci Haddock; Calin Belta; Douglas Densmore

2012-03-01T23:59:59.000Z

398

High performance low power CMOS dynamic logic for arithmetic circuits  

Science Conference Proceedings (OSTI)

This paper presents the design of high performance and low power arithmetic circuits using a new CMOS dynamic logic family, and analyzes its sensitivity against technology parameters for practical applications. The proposed dynamic logic family allows ... Keywords: CMOS digital integrated circuits, CMOS logic circuits, Dynamic logic, High speed arithmetic circuits, Low power arithmetic circuits

Victor Navarro-Botello; Juan A. Montiel-Nelson; Saeid Nooshabadi

2007-04-01T23:59:59.000Z

399

Reusable vibration resistant integrated circuit mounting socket  

DOE Patents (OSTI)

This invention discloses a novel form of socket for integrated circuits to be mounted on printed circuit boards. The socket uses a novel contact which is fabricated out of a bimetallic strip with a shape which makes the end of the strip move laterally as temperature changes. The end of the strip forms a barb which digs into an integrated circuit lead at normal temperatures and holds it firmly in the contact, preventing loosening and open circuits from vibration. By cooling the contact containing the bimetallic strip the barb end can be made to release so that the integrated circuit lead can be removed from the socket without damage either to the lead or to the socket components.

Evans, Craig N. (Irwin, PA)

1995-01-01T23:59:59.000Z

400

Live Working Considerations in Design and Construction of Overhead Transmission Lines  

Science Conference Proceedings (OSTI)

Live working (LW) on overhead transmission lines is the performance of maintenance, construction, and inspection of equipment and circuits that are energized or that may become energized. This report discusses aspects of design and construction of overhead transmission lines that are important to (LW) and examines design modifications that can significantly impact the safe, efficient, and cost-effective performance of LW. This guidance should help line designers identify ways to incorporate the ...

2013-12-02T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

402

Electric Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

403

Merchant Transmission Investment  

E-Print Network (OSTI)

merchant transmission model of the type described above, though Australia has adopted a mixed merchant and regu- 6 lated transmission model.3 However, recent academic proposals,4 as well as FERC’s July 2002 Standard Market Design (SMD) proposals, call... that a nodal or locational marginal pricing (LMP) system is in place with attributes similar to those being proposed by the U.S. Federal Energy Regulatory Commission (FERC) in its SMD proposals and to what is in operation in New 3Two merchant lines...

Joskow, Paul; Tirole, Jean

2004-06-16T23:59:59.000Z

404

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

405

NREL: Energy Analysis: Transmission Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

406

Simulating Zeno physics by quantum quench with superconducting circuits  

E-Print Network (OSTI)

Studying out-of-equilibrium physics in quantum systems under quantum quench is of vast experimental and theoretical interests. Using periodic quantum quenches, we present an experimentally accessible scheme to simulate the quantum Zeno and anti-Zeno effects in an open quantum system of a single superconducting qubit interacting with an array of transmission line resonators. The scheme is based on the following two observations: Firstly, compared with conventional systems, the short-time non-exponential decay in our superconducting circuit system is readily observed; and secondly, a quench-off process mimics an ideal projective measurement when its time duration is sufficiently long. Our results show that quantum quenches can serve as a promising decoherence control strategy.

Qing-Jun Tong; Jun-Hong An; L. C. Kwek; Hong-Gang Luo; C. H. Oh

2013-10-24T23:59:59.000Z

407

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

1993-01-01T23:59:59.000Z

408

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

409

Transmission SEAB Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

410

Transmission planning in China  

Science Conference Proceedings (OSTI)

Though China is well along in restructuring its power markets, it still has some way to travel before economic considerations receive adequate weight in transmission planning decisions. Adoption of more sophisticated tools such as multi-agent modeling will help China continue in its progress in achieving this. (author)

Dong, Jun; Zhang, Jing

2009-07-15T23:59:59.000Z

411

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

412

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

involves the construction of an approximate 1000 mile HVAC and HVDC transmission project from British ACSR. (Northern Segment) b) A 3000 MVA, 500 kV HVAC to +/-500 kV HVDC Converter at the NEO Station. c) A +/-500 kV HVDC line from the NEO Station to the proposed Collinsville Substation in the San Francisco Bay

413

LAP Transmission Rate  

NLE Websites -- All DOE Office Websites (Extended Search)

LAP Transmission Rate 4.50 4.00 3.82 3.50 3.00 of 2.50 c 0 2.I2 2.68 I 3: 2.00 1.50 1.00 0.50 0.00 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012...

414

Transmission Services J7000  

NLE Websites -- All DOE Office Websites (Extended Search)

C T D E S E R T S O U T H W E S T R E G I O N R O C K Y M O U N T A I N R E G I O N Transmission Services J7000 Ensuring the Reliability of the Bulk Electric System Western's...

415

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

Kotlyar, O.M.

1997-03-25T23:59:59.000Z

416

Transmission Enhancement Technology Report  

E-Print Network (OSTI)

to increase transmission capability. Section 3 documents existing technologies used in the industry today the traditional types of design alternatives used by Western and the electric industry. The primary system operate at three times the ampacity of Aluminum Conductor Steel Reinforced (ACSR) conductor and has a much

417

Overload protection circuit for output driver  

DOE Patents (OSTI)

A protection circuit for preventing excessive power dissipation in an output transistor whose conduction path is connected between a power terminal and an output terminal. The protection circuit includes means for sensing the application of a turn on signal to the output transistor and the voltage at the output terminal. When the turn on signal is maintained for a period of time greater than a given period without the voltage at the output terminal reaching a predetermined value, the protection circuit decreases the turn on signal to, and the current conduction through, the output transistor.

Stewart, Roger G. (Neshanic Station, NJ)

1982-05-11T23:59:59.000Z

418

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-34) (12/3/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2001 3, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-34) Bill Erickson - TFP/Walla Walla Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the McNary-Ross Transmission Line ROW between 152/3+2120 to 153/4. The line is 345 kV Single Circuit Transmission Line (project includes adjacent N. Bonneville-Ross 230 kV Single Circuit Transmission Line) having a combined easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Skamania County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA).

419

Definition: Circuit Peak Load Management | Open Energy Information  

Open Energy Info (EERE)

Circuit Peak Load Management Jump to: navigation, search Dictionary.png Circuit Peak Load Management An application utilizing sensors, information processors, communications, and...

420

Neural-network-based fault location estimator for transmission line protection  

Science Conference Proceedings (OSTI)

A classical task in the protection of transmission lines against short circuits is the estimation of the electrical distance to the fault and its comparison against a given threshold to determine whether the line is faulted or not. This paper presents ...

Héctor J. Altuve; Oscar L. Chacón; Ernesto Vázquez; Daniel Posadas; Edgar N. Sánchez

1999-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Generating Circuit Tests by Exploiting Designed Behavior  

E-Print Network (OSTI)

This thesis describes two programs for generating tests for digital circuits that exploit several kinds of expert knowledge not used by previous approaches. First, many test generation problems can be solved efficiently ...

Shirley, Mark Harper

1988-12-01T23:59:59.000Z

422

Low Power Oriented CMOS Circuit Optimization Protocol  

Science Conference Proceedings (OSTI)

Low power oriented circuit optimization consists in selecting the best alternative between gate sizing, buffer insertion and logic structure transformation, for satisfying a delay constraint at minimum area cost. In this paper we used a closed form model ...

A. Verle; X. Michel; N. Azemard; P. Maurine; D. Auvergne

2005-03-01T23:59:59.000Z

423

Energy Extraction for the LHC Superconducting Circuits  

E-Print Network (OSTI)

The superconducting magnets of the LHC will be powered in about 1700 electrical circuits. The energy stored in circuits, up to 1.3 GJ, can potentially cause severe damage of magnets, bus bars and current leads. In order to protect the superconducting elements after a resistive transition, the energy is dissipated into a dump resistor installed in series with the magnet chain that is switched into the circuit by opening current breakers. Experiments and simulation studies have been performed to identify the LHC circuits that need energy extraction. The required values of the extraction resistors have been computed. The outcome of the experimental results and the simulation studies are presented and the design of the different energy extraction systems that operate at 600 A and at 13 kA is described.

Dahlerup-Petersen, K; Schmidt, R; Sonnemann, F

2001-01-01T23:59:59.000Z

424

Carbon nanotube synthesis for integrated circuit interconnects  

E-Print Network (OSTI)

Based on their properties, carbon nanotubes (CNTs) have been identified as ideal replacements for copper interconnects in integrated circuits given their higher current density, inertness, and higher resistance to ...

Nessim, Gilbert Daniel

2009-01-01T23:59:59.000Z

425

The Challenge of Testing RFID Integrated Circuits  

Science Conference Proceedings (OSTI)

RFID integrated circuits often involve many of themost leading edge production technologies availabletoday. The complexities involved with integrating thesecomplexities into the backend and test environment areexceptionally challenging. To date, this ...

David Murfett

2004-01-01T23:59:59.000Z

426

Conformance and mirroring for timed asychronous circuits  

Science Conference Proceedings (OSTI)

Conformance has been used as a correctness criterion for asynchronous circuits. In the case of untimed systems, conformance of an implementation to a specification is equivalent to the failure-freeness between the implementation and the mirror of the ...

Bin Zhou; Tomohiro Yoneda; Bernd-Holger Schlingloff

2001-01-01T23:59:59.000Z

427

Quantum computation beyond the circuit model  

E-Print Network (OSTI)

The quantum circuit model is the most widely used model of quantum computation. It provides both a framework for formulating quantum algorithms and an architecture for the physical construction of quantum computers. However, ...

Jordan, Stephen Paul

2008-01-01T23:59:59.000Z

428

Symbolic Analysis of Nonlinear Analog Circuits  

Science Conference Proceedings (OSTI)

A new method is presented to model symbolically strongly nonlinear circuits, characterized by Piece-Wise Linear (PWL) functions. The method follows the idea of Bokhoven and Leenaerts, and formulates the problem as a linear complementarity problem (LCP). ...

Alicia Manthe; Zhao Li; C.-J. Richard Shi; Kartikeya Mayaram

2003-03-01T23:59:59.000Z

429

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

430

Dynamical Systems in Circuit Designer's Eyes  

SciTech Connect

Examples of nonlinear circuit design are given. Focus of the design process is on theory and engineering methods (as opposed to numerical analysis). Modeling is related to measurements It is seen that the phase plane is still very useful with proper models Harmonic balance/describing function offers powerful insight (via the combination of simulation with circuit and ODE theory). Measurement and simulation capabilities increased, especially harmonics measurements (since sinusoids are easy to generate)

Odyniec, M.

2011-05-09T23:59:59.000Z

431

Electrochemically controlled charging circuit for storage batteries  

DOE Patents (OSTI)

An electrochemically controlled charging circuit for charging storage batteries is disclosed. The embodiments disclosed utilize dc amplification of battery control current to minimize total energy expended for charging storage batteries to a preset voltage level. The circuits allow for selection of Zener diodes having a wide range of reference voltage levels. Also, the preset voltage level to which the storage batteries are charged can be varied over a wide range.

Onstott, E.I.

1980-06-24T23:59:59.000Z

432

Industry-Wide Database: Circuit Breakers  

Science Conference Proceedings (OSTI)

Best practice maintenance and asset management decisions are based on risks associated with actual equipment condition and performance. However, little effort has been made to systematically collect and analyze such industry information for high-voltage circuit breakers. This document presents the results of the initial effort of the Electric Power Research Institute (EPRI) to explore the development of an industry-wide database (IDB) for high-voltage circuit breakers (HVCBs). The project identified ...

2012-12-12T23:59:59.000Z

433

Transmission Developers Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

434

Transmission Siting_071508.indd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

435

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

436

A Smarter Transmission Grid  

Science Conference Proceedings (OSTI)

Our modern transmission grid transports bulk power over long distances and across many provincial boundaries, but ever-increasing energy demands are significantly transforming it. Worldwide, many catalysts are driving this transformation, including emerging supply- and demand-side technologies, cyber security concerns, and aging infrastructures, to name just a few. As the grid transforms and more grid-connected renewable resources complicate reliability, it will be increasingly difficult to meet its futu...

2010-12-31T23:59:59.000Z

437

Transmission Price Risk Management  

Science Conference Proceedings (OSTI)

This report is concerned with the financial risks that arise from the uncertain price of transmission service in restructured or competitive electricity markets. These risks are most severe in markets with locational pricing (LMP), but they also exist in more traditionally organized electricity markets. This report has two main purposes. The first is to review the existing mathematical models of electricity price formation in spot and forward markets that may be helpful as the foundations for developing ...

2006-12-04T23:59:59.000Z

438

Green Transmission Efficiency Initiative  

Science Conference Proceedings (OSTI)

As a consequence of escalating interest in the environment and climate changea national focus on energy efficiency, and growing electricity demandthe time is right to assess energy efficiency from both an end-use perspective as well as across the utility value chain, from generation, to transmission, to distribution. The reduction of our carbon footprint and increasing the role of renewable energy are an important part of the strategy for the greening for electric energy supply. As a result, efficient po...

2009-07-31T23:59:59.000Z

439

Electricity Transmission and Distribution Technologies ...  

Electricity Transmission and Distribution Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research ...

440

WestConnect Transmission Product  

NLE Websites -- All DOE Office Websites (Extended Search)

WestConnect Transmission Product Federal Register Notices Customer Notifications Customer Comments Approved Rate Order FERC Confirmation...

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Transmission eigenvalues for elliptic operators  

E-Print Network (OSTI)

A reduction of the transmission eigenvalue problem for multiplicative sign-definite perturbations of elliptic operators with constant coefficients to an eigenvalue problem for a non-selfadjoint compact operator is given. Sufficient conditions for the existence of transmission eigenvalues and completeness of generalized eigenstates for the transmission eigenvalue problem are derived. In the trace class case, the generic existence of transmission eigenvalues is established.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

2010-07-03T23:59:59.000Z

442

Transmission Planning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to...

443

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theMontana-Alberta Tie 230 kV Transmission Line: TransmissionNorthern California Transmission Line Project, Technical

Mills, Andrew D.

2009-01-01T23:59:59.000Z

444

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

B. Kirby. 2001. Transmission Planning for a Restructuringindustry_issues/energy_infrastructure/transmission/transmission_hirst.pdf Joskow, P.L. 2005a. “Transmission

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

445

EA-1899: Rerouting and Renovating of Estes-Flatiron Three Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

99: Rerouting and Renovating of Estes-Flatiron Three 99: Rerouting and Renovating of Estes-Flatiron Three Transmission Lines to Double Circuit 115-kV, Larimer County, Colorado EA-1899: Rerouting and Renovating of Estes-Flatiron Three Transmission Lines to Double Circuit 115-kV, Larimer County, Colorado Summary DOE's Western Area Power Administration started to prepare an EA to evaluate the environmental impacts of a proposal to reroute and renovate the Estes-Flatiron Three Transmission Lines in Larimer County, Colorado. Based on comments received during the scoping period, Western ended preparation of DOE/EA-1899 and announced its intent to prepare an environmental impact statement, DOE/EIS-0483. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

446

Triple effect absorption chiller utilizing two refrigeration circuits  

DOE Patents (OSTI)

A triple effect absorption method and apparatus having a high coefficient of performance. Two single effect absorption circuits are combined with heat exchange occurring between a condenser and absorber of a high temperature circuit, and a generator of a low temperature circuit. The evaporators of both the high and low temperature circuits provide cooling to an external heat load.

DeVault, Robert C. (Knoxville, TN)

1988-01-01T23:59:59.000Z

447

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

448

Control circuit for automatic battery chargers  

SciTech Connect

An improved battery charger apparatus having a control circuit providing different charging periods which are automatically correlated with the type of battery connected to the charge for charging the connected battery to a preselected full charge state. The apparatus has a charging circuit for charging the battery, a sensing circuit for sensing the state of the battery during charging thereof by the charging circuit and a circuit for determining first and second predetermined reference voltage/current states. The apparatus causes the charging of the battery at a preselected initial charging level for an initial time period and establishes a first finish time period. The apparatus further determines a first time at which the state of the battery reaches the first predetermined referenced voltage/current state during the initial time period, and causes the charging circuit to continue to charge the battery at a preselected first charging level after the determination of the first time for a first finish time period. The apparatus further establishes a second finish time period and determines a second time at which the state of the battery reaches the second predetermined referenced voltage/current state during the first finish time period. The apparatus terminates charging of the battery if the state of the battery does not reach the second predetermined referenced voltage/current state during the first finish time period, and causes the charging circuit to continue to charge the battery at a preselected second charging level after the determination of the second time for a second finish time period.

Lambert, F.J.; Bosack, D.J.; Johansen, D.K.

1984-05-22T23:59:59.000Z

449

Timing modeling and optimization under the transmission line model  

E-Print Network (OSTI)

Abstract—As the operating frequency increases to gigahertz and the rise time of a signal is less than or comparable to the time-of-flight delay of a wire, it is necessary to consider the transmission line behavior for delay computation. We present in this paper, an analytical formula for the delay computation under the transmission line model. Extensive simulations with SPICE show the high fidelity of the formula. Compared with previous works, our model leads to smaller average errors in delay estimation. Based on this formula, we show the property that the minimum delay for a transmission line with reflection occurs when the number of round trips is minimized (i.e., equals one). Besides, we show that the delay of a circuit path is a posynomial function in wire and buffer sizes, implying that a local optimum is equal to the global optimum. Thus, we can apply any efficient search algorithm such as the well-known gradient search procedure to compute the globally optimal solution. Experimental results show that simultaneous wire and buffer sizing is very effective for performance optimization under the transmission line model. Index Terms—Buffer sizing, delay model, inductance, interconnect, performance optimization, transmission line, wire sizing.

Tai-chen Chen; Song-ra Pan; Yao-wen Chang

2004-01-01T23:59:59.000Z

450

Bulk Power Transmission Study  

E-Print Network (OSTI)

"Texans now have a choice. We can become more efficient and maintain our standard of living, or we can continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled, the extensive natural gas pipeline network moved energy easily within the state. In recent years two things have changed: 1. Electric utilities have made extensive investment in lignite, coal, and nuclear plants and, 2. Improvements in gas turbine technology and the removal of institutional barriers has encouraged cogeneration at many of our energy intensive process industries. This energy diversity means that there are now significant differences in energy costs between units. The variable costs of generation of power can vary between units by a ratio of 2 or 3 to 1 and this difference will be accentuated when energy costs rise (and they will; it’s a question of when, not if). The potential for costs savings by optional dispatching of the entire interconnected system are greater than ever before as demonstrated by the PUC's Bulk Power Transmission Study. And the potential can be enhanced with added transmission system investment. Cogeneration and small power production has proven to be the most cost effective way for Texas to add additional generating capacity needed to supply an economy that is starting to rebound and to replace old, obsolete power plants. The freedom to locate these facilities at the fuel source or at the site of large thermal demand makes real economic and environmental sense. The use of renewable or waste fuels allows something that would otherwise be wasted to contribute to our economy. Fossil fuels that are displaced can be redirected to another use or consumed for future benefit. By integrating a gas turbine generator with a. process plant, the natural gas required for producing electricity can be reduced by 40% below that required for a combined cycle. The heat rejected from a gas turbine, combined cycle, or steam plant can be redirected to a process use that contributes to our economy by producing something of value to world markets. By contrast a conventional power plant is paid for by the rate payers and consumes Texas natural resources and therefore is a burden rather than an enhancement to our economy. The optimal location of facilities are possible only if there is an adequate transmission system. Utility, consumer and industry must cooperate to improve our transmission system for the benefit of all Texas. The Texas Public Utilities Commission has taken the lead in promoting efficiency by requiring transmission wheeling between qualifying facilities and electric utilities. Several cogeneration facilities have been constructed as a result. In order to encourage small power production, the rule needs to be expanded to include projects interconnected with distribution systems. Most renewable resource projects are relatively small and cannot afford the cost of a high voltage interconnect, and yet their characteristics match a baseload need. The ability to wheel power to a utility that needs base load power from a distribution level interconnection is essential to development of these smaller projects."

John, T.

1988-09-01T23:59:59.000Z

451

NREL: Transmission Grid Integration - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

452

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

453

Transmission Power Quality Benchmarking Method  

Science Conference Proceedings (OSTI)

In 1990, EPRI initiated a power quality monitoring project at the distribution level known as the EPRI DPQ Project. During this project, twenty-four utilities monitored power quality levels on their distribution circuits. Nearly 300 sites were monitored for a period of approximately two years. The data gathered were characterized and analyzed to form a baseline of power quality on U.S. distribution circuits.

2000-12-05T23:59:59.000Z

454

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications Proceedings of the March 25-26, 2009 Conference for the...

455

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

stability  analysis of transmission and distribution Voltage Recovery, NERC Transmission Issues  Subcommitte Air Conditioner Response to Transmission Faults. ” ,” IEEE 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

456

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

differences: models for transmission property rights,” IEEEto solve power transmission network design problems,” IEEES. A. "Network topologies and transmission investment under

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

457

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

Georgia Transmission Corp Place Georgia Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission Yes...

458

Definition: Transmission Customer | Open Energy Information  

Open Energy Info (EERE)

Load-Serving Entity, or Purchasing-Selling Entity.1 Related Terms transmission service, transmission lines, transmission line References Glossary of Terms Used in Reliability...

459

Definition: Transmission Owner | Open Energy Information  

Open Energy Info (EERE)

facilities.1 Related Terms Transmission Operatortransmission lines, transmission line, transmission lines References Glossary of Terms Used in Reliability Standards An in...

460

A PRECISION ANALOG FIBER OPTIC TRANSMISSION SYSTEM  

E-Print Network (OSTI)

Optical Fibers for Transmission, John Wiley and Sons, 9.Laboratories, Transmission Systems for Communications, BellANALOG FIBER OPTIC TRANSMISSION SYSTEM G. Stover M.S. Thesis

Stover, G.

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Noise-Limited Frequency Signal Transmission in Gene Circuits Cheemeng Tan,* Faisal Reza,*y  

E-Print Network (OSTI)

clocks (2), Ca21 signaling pathways (3,4), p53 DNA repair pathways (5), NF-kB pathways (6), and cell of ;0.008/s significantly increased the activity of Ras proteins (22). Similarly, the frequency of NF-kB

You, Lingchong

462

Lookout device for high voltage circuit breaker  

DOE Patents (OSTI)

An improved lockout assembly is provided for a circuit breaker to lock the switch handle into a selected switch position. The lockout assembly includes two main elements, each having a respective foot for engaging a portion of the upper housing wall of the circuit breaker. The first foot is inserted into a groove in the upper housing wall, and the second foot is inserted into an adjacent aperture (e.g., a slot) in the upper housing wall. The first foot is slid under and into engagement with a first portion, and the second foot is slid under and into engagement with a second portion of the upper housing wall. At the same time the respective two feet are placed in engagement with the respective portions of the upper housing wall, two holes, one on each of the respective two main elements of the assembly, are placed in registration; and a locking device, such as a special scissors equipped with a padlock, is installed through the registered holes to secure the lockout assembly on the circuit breaker. When the lockout assembly of the invention is secured on the circuit breaker, the switch handle of the circuit breaker is locked into the selected switch position and prevented from being switched to another switch position.

Kozlowski, L.J.; Shirey, L.A.

1991-12-31T23:59:59.000Z

463

Lockout device for high voltage circuit breaker  

DOE Patents (OSTI)

An improved lockout assembly is provided for a circuit breaker to lock the switch handle into a selected switch position. The lockout assembly includes two main elements, each having a respective foot for engaging a portion of the upper housing wall of the circuit breaker. The first foot is inserted into a groove in the upper housing wall, and the second foot is inserted into an adjacent aperture (e.g., a slot) in the upper housing wall. The first foot is slid under and into engagement with a first portion, and the second foot is slid under and into engagement with a second portion of the upper housing wall. At the same time the respective two feet are placed in engagement with the respective portions of the upper housing wall, two holes, one on each of the respective two main elements of the assembly, are placed in registration; and a locking device, such as a special scissors equipped with a padlock, is installed through the registered holes to secure the lockout assembly on the circuit breaker. When the lockout assembly of the invention is secured on the circuit breaker, the switch handle of the circuit breaker is locked into the selected switch position and prevented from being switched to another switch position.

Kozlowski, L.J.; Shirey, L.A.

1993-01-26T23:59:59.000Z

464

Lockout device for high voltage circuit breaker  

Science Conference Proceedings (OSTI)

An improved lockout assembly is provided for a circuit breaker to lock the switch handle into a selected switch position. The lockout assembly includes two main elements, each having a respective foot for engaging a portion of the upper housing wall of the circuit breaker. The first foot is inserted into a groove in the upper housing wall, and the second foot is inserted into an adjacent aperture (e.g., a slot) in the upper housing wall. The first foot is slid under and into engagement with a first portion, and the second foot is slid under and into engagement with a second portion of the upper housing wall. At the same time the repsective two feet are placed in engagement with the respective portions of the upper housing wall, two holes, one on each of the respective two main elements of the assembly, are placed in registration; and a locking device, such as a special scissors equipped with a padlock, is installed through the registered holes to secure the lockout assembly on the circuit breaker. When the lockout assembly of the invention is secured on the circuit breaker, the switch handle of the circuit breaker is locked into the selected switch position and prevented from being switched to another switch position.

Kozlowski, Lawrence J. (New Kensington, PA); Shirey, Lawrence A. (North Huntingdon, PA)

1993-01-01T23:59:59.000Z

465

Dual circuit embossed sheet heat transfer panel  

DOE Patents (OSTI)

A heat transfer panel provides redundant cooling for fusion reactors or the like environment requiring low-mass construction. Redundant cooling is provided by two independent cooling circuits, each circuit consisting of a series of channels joined to inlet and outlet headers. The panel comprises a welded joinder of two full-size and two much smaller partial-size sheets. The first full-size sheet is embossed to form first portions of channels for the first and second circuits, as well as a header for the first circuit. The second full-sized sheet is then laid over and welded to the first full-size sheet. The first and second partial-size sheets are then overlaid on separate portions of the second full-sized sheet, and are welded thereto. The first and second partial-sized sheets are embossed to form inlet and outlet headers, which communicate with channels of the second circuit through apertures formed in the second full-sized sheet. 6 figs.

Morgan, G.D.

1984-02-21T23:59:59.000Z

466

Dual circuit embossed sheet heat transfer panel  

DOE Patents (OSTI)

A heat transfer panel provides redundant cooling for fusion reactors or the like environment requiring low-mass construction. Redundant cooling is provided by two independent cooling circuits, each circuit consisting of a series of channels joined to inlet and outlet headers. The panel comprises a welded joinder of two full-size and two much smaller partial-size sheets. The first full-size sheet is embossed to form first portions of channels for the first and second circuits, as well as a header for the first circuit. The second full-sized sheet is then laid over and welded to the first full-size sheet. The first and second partial-size sheets are then overlaid on separate portions of the second full-sized sheet, and are welded thereto. The first and second partial-sized sheets are embossed to form inlet and outlet headers, which communicate with channels of the second circuit through apertures formed in the second full-sized sheet.

Morgan, Grover D. (St. Louis County, MO)

1984-01-01T23:59:59.000Z

467

Automated manual transmission clutch controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

1999-11-30T23:59:59.000Z

468

Transmission Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

469

Optimizing the Transmission Line Design for Effective Live Working  

Science Conference Proceedings (OSTI)

This report is intended to help designers of transmission lines to factor in the techniques and tools for live working when designing a new line. This draft progress report is being provided to members of EPRI's base-funded Live Working Research project for review and comment. A final version of the report will be included as part of a chapter in the revised Red Book, which is being rewritten in 2003 and 2004. Live work is the performance of maintenance, construction, or testing on equipment and circuits...

2003-08-28T23:59:59.000Z

470

Circuit Analysis in Metal-Optics, Theory and Applications  

E-Print Network (OSTI)

inductance, a plasmonic transmission line can support very16 3.1 - Diverging Transmission Lineinductance, a plasmonic transmission line can have impedance

Staffaroni, Matteo

2011-01-01T23:59:59.000Z

471

Advanced CMOS circuits for microwave and millimeter-wave communications  

E-Print Network (OSTI)

Transmission line and lumped element based (a) 90 ? coupler,a) CPW transmission line with ground plane meshing. (b)coplanar waveguide (CPW) transmission line is designed using

Cetinoneri, Berke

2011-01-01T23:59:59.000Z

472

Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits  

Energy.gov (U.S. Department of Energy (DOE))

Docket EO-05-01: Pursuant to the United States Department of Energy ("DOE") Order No. 202-05-3, issued December 20, 2005 ("DOE Potomac River Order") Pepco hereby files this revised notice of the...

473

Application of Extruded Dielectric Cable Model in the Dynamic Thermal Circuit Rating (DTCR) System for San Diego Gas & Electric's Ot ay Mesa Power Loop Project  

Science Conference Proceedings (OSTI)

Due to limited incentives for new construction, utilities around the world are undergoing a major transformation that is redefining the use of existing power equipment in the electric transmission network. Under these circumstances, utilities are forced to find new ways to increase power flow through the existing transmission corridors with minimal investments. This report addresses the application of the Electric Power Research Institute's (EPRI's) Dynamic Thermal Circuit Rating (DTCR) program to San Di...

2010-02-02T23:59:59.000Z

474

Pepco Update on Current Construction Work and Mirant Generation Needs for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Update on Current Construction Work and Mirant Generation Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage Docket No. EO-05-01. Pepco needs the following to occur to provide necessary reliability to the central D.C. area during this scheduled June outage in order to complete installation of new transmission circuits to serve the central D.C. area. The situations that we would expect generation support for this outage are as follows: Two 230 KV lines in service: 264 MW generation to protect against the loss of one 230KV line. One 230KV line in service (i.e., one of the two lines has experienced an outage): 264 MW generation is required, with an additional

475

Package for integrated optic circuit and method  

DOE Patents (OSTI)

A structure and method for packaging an integrated optic circuit. The package comprises a first wall having a plurality of microlenses formed therein to establish channels of optical communication with an integrated optic circuit within the package. A first registration pattern is provided on an inside surface of one of the walls of the package for alignment and attachment of the integrated optic circuit. The package in one embodiment may further comprise a fiber holder for aligning and attaching a plurality of optical fibers to the package and extending the channels of optical communication to the fibers outside the package. In another embodiment, a fiber holder may be used to hold the fibers and align the fibers to the package. The fiber holder may be detachably connected to the package.

Kravitz, Stanley H. (26 Aspen Rd., Placitas, NM 87043); Hadley, G. Ronald (6012 Annapolis NE., Albuquerque, NM 87111); Warren, Mial E. (3825 Mary Ellen NE., Albuquerque, NM 87111); Carson, Richard F. (1036 Jewel Pl. NE., Albuquerque, NM 87123); Armendariz, Marcelino G. (1023 Oro Real NE., Albuquerque, NM 87123)

1998-01-01T23:59:59.000Z

476

Package for integrated optic circuit and method  

DOE Patents (OSTI)

A structure and method are disclosed for packaging an integrated optic circuit. The package comprises a first wall having a plurality of microlenses formed therein to establish channels of optical communication with an integrated optic circuit within the package. A first registration pattern is provided on an inside surface of one of the walls of the package for alignment and attachment of the integrated optic circuit. The package in one embodiment may further comprise a fiber holder for aligning and attaching a plurality of optical fibers to the package and extending the channels of optical communication to the fibers outside the package. In another embodiment, a fiber holder may be used to hold the fibers and align the fibers to the package. The fiber holder may be detachably connected to the package. 6 figs.

Kravitz, S.H.; Hadley, G.R.; Warren, M.E.; Carson, R.F.; Armendariz, M.G.

1998-08-04T23:59:59.000Z

477

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network (OSTI)

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

478

Quantum Electric Circuits Analogous to Ballistic Conductors  

E-Print Network (OSTI)

The conductance steps in a constricted two-dimensional electron gas and the minimum conductivity in graphene are related to a new uncertainty relation between electric charge and conductance in a quantized electric circuit that mimics the electric transport in mesoscopic systems. This uncertainty relation makes specific use of the discreteness of electric charge. Quantum electric circuits analogous to both constricted two-dimensional electron gas and graphene are introduced. In the latter case a new insight into the origin of minimum conductivity is obtained.

Daniela Dragoman

2007-08-09T23:59:59.000Z

479

Hybrid high direct current circuit interrupter  

DOE Patents (OSTI)

A device and a method are disclosed for interrupting very high direct currents (greater than 100,000 amperes) and simultaneously blocking high voltages (greater than 600 volts). The device utilizes a mechanical switch to carry very high currents continuously with low loss and a silicon controlled rectifier (SCR) to bypass the current around the mechanical switch while its contacts are separating. A commutation circuit, connected in parallel with the SCR, turns off the SCR by utilizing a resonant circuit to divert the SCR current after the switch opens. 7 figs.

Rockot, J.H.; Mikesell, H.E.; Jha, K.N.

1998-08-11T23:59:59.000Z

480

Hybrid high direct current circuit interrupter  

DOE Patents (OSTI)

A device and a method for interrupting very high direct currents (greater than 100,000 amperes) and simultaneously blocking high voltages (greater than 600 volts). The device utilizes a mechanical switch to carry very high currents continuously with low loss and a silicon controlled rectifier (SCR) to bypass the current around the mechanical switch while its contacts are separating. A commutation circuit, connected in parallel with the SCR, turns off the SCR by utilizing a resonant circuit to divert the SCR current after the switch opens.

Rockot, J.H.; Mikesell, H.E.; Jha, K.N.

1996-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "transmission circuit outages" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

A GaAs transceiver chip for optical data transmission  

SciTech Connect

The present article describes a transceiver VLSI chip for optical data transmission, at 1 Gbit/s (1.4 Gbit/s in selected production), made in GaAs technology. The transceiver makes the parallel-to-serial and serial-to-parallel conversion as well as the encoding and decoding of 32 bit data words. The circuit operates in a completely asynchronous mode, allowing the possibility of switching on-off the transmission in few nsec and of using the transceiver not only in point-to-point topologies, but also in flooding topologies (i.e. star connections). The radiation hardness and the relatively low power consumption, respect to TTL, of the GaAs, extend the use of the chip to a large number of applications in present and future high energy physics experimental apparatus.

Mirabelli, G.; Petrolo, E.; Valente, E. (Ist. Nazionale di Fisica Nucleare, Roma (Italy)); Cardarelli, R.; Santonico, R. (Sezione di Roma 2 and Univ. di Roma (Italy). Ist. Nazionale di Fisica Nucleare); Ferrer, M.L. (Lab. Nazionali di Frascati (Italy). Ist. Nazionale di Fisica Nucleare)

1993-08-01T23:59:59.000Z

482

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

1994-02-01T23:59:59.000Z

483

Triple effect absorption chiller utilizing two refrigeration circuits  

Science Conference Proceedings (OSTI)

This patent describes a heat absorption method for an absorption chiller. It comprises: providing a firs absorption system circuit for operation within a first temperature range, providing a second absorption system circuit for operation within a second temperature range; heat exchanging refrigerant and absorber solution; thermal communication with an external heat load. This patent describes a heat absorption apparatus for use as an absorption chiller. It includes: a first absorption system circuit for operation within a first temperature range; a second absorption system circuit for operation within a second temperature range which has a lower maximum temperature relative to the first temperature range; the first circuit having generator means, condenser means, evaporator means, and absorber means operatively connected together; the second circuit having generator means condenser means, evaporator means, and absorber means operative connected together; and the first circuit condenser means and the first circuit absorber means being in heat exchange communication with the second circuit generator means.

DeVault, R.C.

1988-03-22T23:59:59.000Z

484

Transmission Line Protection Support Tools: Fault Location Algorithms and the Potential of Using Intelligent Electronic Device Data for Protection Applications  

Science Conference Proceedings (OSTI)

Overhead transmission lines experience short-circuit faults due to lightning, stormy weather conditions, animal or tree contact, and insulation failure in power system equipment. To ensure continuity of electric service, utilities try to quickly determine the location of the fault, perform maintenance or repair, and return the line to service. Due to advances in modern technology, locating faults in a networked transmission system is now possible with substantial accuracy. Voltage and current ...

2013-12-23T23:59:59.000Z

485

Cavity quantum electrodynamics for superconducting electrical circuits: an architecture for quantum computation  

E-Print Network (OSTI)

We propose a realizable architecture using one-dimensional transmission line resonators to reach the strong coupling limit of cavity quantum electrodynamics in superconducting electrical circuits. The vacuum Rabi frequency for the coupling of cavity photons to quantized excitations of an adjacent electrical circuit (qubit) can easily exceed the damping rates of both the cavity and the qubit. This architecture is attractive both as a macroscopic analog of atomic physics experiments and for quantum computing and control, since it provides strong inhibition of spontaneous emission, potentially leading to greatly enhanced qubit lifetimes, allows high-fidelity quantum non-demolition measurements of the state of multiple qubits, and has a natural mechanism for entanglement of qubits separated by centimeter distances. In addition it would allow production of microwave photon states of fundamental importance for quantum communication.

Alexandre Blais; Ren-Shou Huang; Andreas Wallraff; S. M. Girvin; R. J. Schoelkopf

2004-02-07T23:59:59.000Z

486

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest...

487

Kentucky Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

EPRI, in conjunction with Georgia Transmission Corporation (GTC) and Photo Science, Inc. (PSI), developed a standardized methodology for siting overhead electric transmission lines. EPRI report 1013080, EPRI-GTC Overhead Electric Transmission Line Siting Methodology, published February 2006, provides additional information. This methodology has been applied in Georgia and currently is being applied to projects in Kentucky by East Kentucky Power Cooperative and E.ON U.S. on behalf of Louisville Gas and El...

2007-12-18T23:59:59.000Z

488

On adaptive transmission, signal detection and channel estimation for multiple antenna systems  

E-Print Network (OSTI)

This research concerns analysis of system capacity, development of adaptive transmission schemes with known channel state information at the transmitter (CSIT) and design of new signal detection and channel estimation schemes with low complexity in some multiple antenna systems. We first analyze the sum-rate capacity of the downlink of a cellular system with multiple transmit antennas and multiple receive antennas assuming perfect CSIT. We evaluate the ergodic sum-rate capacity and show how the sum-rate capacity increases as the number of users and the number of receive antennas increases. We develop upper and lower bounds on the sum-rate capacity and study various adaptive MIMO schemes to achieve, or approach, the sum-rate capacity. Next, we study the minimum outage probability transmission schemes in a multiple-input-single-output (MISO) flat fading channel assuming partial CSIT. Considering two special cases: the mean feedback and the covariance feedback, we derive the optimum spatial transmission directions and show that the associated optimum power allocation scheme, which minimizes the outage probability, is closely related to the target rate and the accuracy of the CSIT. Since CSIT is obtained at the cost of feedback bandwidth, we also consider optimal allocation of bandwidth between the data channel and the feedback channel in order to maximize the average throughput of the data channel in MISO, flat fading, frequency division duplex (FDD) systems. We show that beamforming based on feedback CSI can achieve an average rate larger than the capacity without CSIT under a wide range of mobility conditions. We next study a SAGE-aided List-BLAST detection scheme for MIMO systems which can achieve performance close to that of the maximum-likelihood detector with low complexity. Finally, we apply the EM and SAGE algorithms in channel estimation for OFDM systems with multiple transmit antennas and compare them with a recently proposed least-squares based estimation algorithm. The EM and SAGE algorithms partition the problem of estimating a multi-input channel into independent channel estimation for each transmit-receive antenna pair, therefore avoiding the matrix inversion encountered in the joint least-squares estimation.

Xie, Yongzhe

2004-08-01T23:59:59.000Z

489

Electronic circuit for measuring series connected electrochemical cell voltages  

DOE Patents (OSTI)

An electronic circuit for measuring voltage signals in an energy storage device is disclosed. The electronic circuit includes a plurality of energy storage cells forming the energy storage device. A voltage divider circuit is connected to at least one of the energy storage cells. A current regulating circuit is provided for regulating the current through the voltage divider circuit. A voltage measurement node is associated with the voltage divider circuit for producing a voltage signal which is proportional to the voltage across the energy storage cell.

Ashtiani, Cyrus N. (West Bloomfield, MI); Stuart, Thomas A. (Toledo, OH)

2000-01-01T23:59:59.000Z

490

Grinding circuit control using programmable logic controllers  

Science Conference Proceedings (OSTI)

This paper presents an application for cement milling system. In this application the process is controlled by software running on Programmable Logic Controllers. The appliance used to observe industrial process show the following mill parameters: feed ... Keywords: PLC programming, ball mill, clinker grinding, grinding circuit, programmable logic controllers

Costea R. Claudiu; Silaghi Helga Maria; Rohde L. Ulrich; Silaghi A. Marius

2011-08-01T23:59:59.000Z

491

Three-dimensional Integrated Circuit Design  

Science Conference Proceedings (OSTI)

With vastly increased complexity and functionality in the "nanometer era" (i.e. hundreds of millions of transistors on one chip), increasing the performance of integrated circuits has become a challenging task. This is due primarily to the inevitable ... Keywords: Computer Architecture, Computer Engineering, Computer Science

Vasilis F. Pavlidis; Eby G. Friedman

2008-09-01T23:59:59.000Z

492

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(including regional diversity, AC-DC transmission and distribution solutions, microgrids, energy storage, and centralized-decentralized control) * Accommodates two-way flows...

493

NREL: Transmission Grid Integration - Webmaster  

NLE Websites -- All DOE Office Websites (Extended Search)

reply. Your name: Your email address: Your message: Send Message Printable Version Transmission Grid Integration Home Issues Projects Research Staff Working with Us Publications...

494

NREL: Transmission Grid Integration - Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Generation Integration Study Oahu Wind Integration and Transmission SIND Toolkit Electricity Market Design Energy Imbalance Markets Flexible Energy Scheduling Tool for...

495

The interior transmission problem and bounds on transmission eigenvalues  

E-Print Network (OSTI)

We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

2010-09-28T23:59:59.000Z

496

The interior transmission problem and bounds on transmission eigenvalues  

E-Print Network (OSTI)

We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

Hitrik, Michael; Ola, Petri; Päivärinta, Lassi

2010-01-01T23:59:59.000Z

497

Probabilistic Approach to Quantifying the Contribution of Variable Generation and Transmission to System Reliability: Preprint  

SciTech Connect

The increasing electrical load served by variable generation (VG), such as wind and solar energy, in the United States and many other countries has stimulated an interesting line of research to better quantify the capacity value of these resources. Methods applied traditionally to thermal units based on their average outage rates do not apply to VG because of their uncertain and non-dispatchable nature. The North American Electric Reliability Corporation's Integration of Variable Generation Task Force recently released a report that highlighted the need to develop and benchmark underlying loss-of-load expectation and related metrics that reasonably and fairly calculate the contribution to planning reserves, or capacity value, of solar and wind power. As the fraction of generation coming from VG becomes more significant, their estimated capacity value will have a larger impact on system planning. In this paper, we provide a method to include VG in traditional probabilistic-based adequacy methods. This method has been implemented in the Renewable Energy Probabilistic Resource Assessment tool developed at the National Renewable Energy Laboratory. Through an example based on the U.S. Western Interconnection, this method is applied to assess the effect that transmission can have on resource adequacy. We also analyze the interactions between available transmission and capacity value for VG.

Ibanez, E.; Milligan, M.

2012-09-01T23:59:59.000Z

498

Probabilistic Approach to Quantifying the Contribution of Variable Generation and Transmission to System Reliability: Preprint  

DOE Green Energy (OSTI)

The increasing electrical load served by variable generation (VG), such as wind and solar energy, in the United States and many other countries has stimulated an interesting line of research to better quantify the capacity value of these resources. Methods applied traditionally to thermal units based on their average outage rates do not apply to VG because of their uncertain and non-dispatchable nature. The North American Electric Reliability Corporation's Integration of Variable Generation Task Force recently released a report that highlighted the need to develop and benchmark underlying loss-of-load expectation and related metrics that reasonably and fairly calculate the contribution to planning reserves, or capacity value, of solar and wind power. As the fraction of generation coming from VG becomes more significant, their estimated capacity value will have a larger impact on system planning. In this paper, we provide a method to include VG in traditional probabilistic-based adequacy methods. This method has been implemented in the Renewable Energy Probabilistic Resource Assessment tool developed at the National Renewable Energy Laboratory. Through an example based on the U.S. Western Interconnection, this method is applied to assess the effect that transmission can have on resource adequacy. We also analyze the interactions between available transmission and capacity value for VG.

Ibanez, E.; Milligan, M.

2012-09-01T23:59:59.000Z

499

Circuit design for embedded memory in low-power integrated circuits  

E-Print Network (OSTI)

This thesis explores the challenges for integrating embedded static random access memory (SRAM) and non-volatile memory-based on ferroelectric capacitor technology-into lowpower integrated