1

Microsoft Word - Final_NineCanyon_CommunicationTowerInstall_CX  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2013 1, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Kelly Gardner, PMP Project Manager, TEP-TPP-1 Proposed Action: Nine Canyon Substation Communication Tower Addition: 331800 McNary Sub Bus Tie Relay Replacements and 310427 McNary-Badger Canyon Transfer Trip Install Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 - Additions and modifications to transmission facilities Location: Kennewick, Benton County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install a 60-foot communications tower and associated communication equipment at the Benton County Public Utility District's Nine Canyon Substation in Benton County, Washington. The upgrade would involve replacing the

2

Cooling tower waste reduction  

SciTech Connect

At Lawrence Livermore National Laboratory (LLNL), the two main cooling tower systems (central and northwest) were upgraded during the summer of 1997 to reduce the generation of hazardous waste. In 1996, these two tower systems generated approximately 135,400 lbs (61,400 kg) of hazardous sludge, which is more than 90 percent of the hazardous waste for the site annually. At both, wet decks (cascade reservoirs) were covered to block sunlight. Covering the cascade reservoirs reduced the amount of chemical conditioners (e.g. algaecide and biocide), required and in turn the amount of waste generated was reduced. Additionally, at the northwest cooling tower system, a sand filtration system was installed to allow cyclical filtering and backflushing, and new pumps, piping, and spray nozzles were installed to increase agitation. the appurtenance upgrade increased the efficiency of the cooling towers. The sand filtration system at the northwest cooling tower system enables operators to continuously maintain the cooling tower water quality without taking the towers out of service. Operational costs (including waste handling and disposal) and maintenance activities are compared for the cooling towers before and after upgrades. Additionally, the effectiveness of the sand filter system in conjunction with the wet deck covers (northwest cooling tower system), versus the cascade reservoir covers alone (south cooling tower south) is discussed. the overall expected return on investment is calculated to be in excess of 250 percent. this upgrade has been incorporated into the 1998 DOE complex-wide water conservation project being led by Sandia National Laboratory/Albuquerque.

Coleman, S.J.; Celeste, J.; Chine, R.; Scott, C.

1998-05-01T23:59:59.000Z

3

Tower Temperature and Humidity Sensors (TWR) Handbook  

Science Conference Proceedings (OSTI)

Three tall towers are installed at the Atmospheric Radiation Measurement (ARM) Climate Research Facility: a 60-meter triangular tower at the Southern Great Plains (SGP) Central Facility (CF), a 21-meter walkup scaffolding tower at the SGP Okmulgee forest site (E21), and a 40-meter triangular tower at the North Slope of Alaska (NSA) Barrow site. The towers are used for meteorological, radiological, and other measurements.

Cook, DR

2010-02-01T23:59:59.000Z

4

Convection towers  

DOE Patents (OSTI)

Convection towers which are capable of cleaning the pollution from large quantities of air, of generating electricity, and of producing fresh water utilize the evaporation of water sprayed into the towers to create strong airflows and to remove pollution from the air. Turbines in tunnels at the skirt section of the towers generate electricity, and condensers produce fresh water. 6 figs.

Prueitt, M.L.

1996-01-16T23:59:59.000Z

5

Convection towers  

DOE Patents (OSTI)

Convection towers which are capable of cleaning the pollution from large quantities of air, of generating electricity, and of producing fresh water utilize the evaporation of water sprayed into the towers to create strong airflows and to remove pollution from the air. Turbines in tunnels at the skirt section of the towers generate electricity, and condensers produce fresh water.

Prueitt, Melvin L. (Los Alamos, NM)

1996-01-01T23:59:59.000Z

6

Convection towers  

DOE Patents (OSTI)

Convection towers which are capable of cleaning the pollution from large quantities of air, of generating electricity, and of producing fresh water utilize the evaporation of water sprayed into the towers to create strong airflows and to remove pollution from the air. Turbines in tunnels at the skirt section of the towers generate electricity, and condensers produce fresh water.

Prueitt, Melvin L. (Los Alamos, NM)

1995-01-01T23:59:59.000Z

7

Convection towers  

DOE Patents (OSTI)

Convection towers which are capable of cleaning the pollution from large quantities of air and of generating electricity utilize the evaporation of water sprayed into the towers to create strong airflows and to remove pollution from the air. Turbines in tunnels at the skirt section of the towers generate electricity. Other embodiments may also provide fresh water, and operate in an updraft mode.

Prueitt, Melvin L. (Los Alamos, NM)

1994-01-01T23:59:59.000Z

8

Convection towers  

DOE Patents (OSTI)

Convection towers which are capable of cleaning the pollution from large quantities of air and of generating electricity utilize the evaporation of water sprayed into the towers to create strong airflows and to remove pollution from the air. Turbines in tunnels at the skirt section of the towers generate electricity. Other embodiments may also provide fresh water, and operate in an updraft mode. 5 figures.

Prueitt, M.L.

1994-02-08T23:59:59.000Z

9

Cooling Towers, Energy Conservation Strategies  

E-Print Network (OSTI)

Cooling towers, because of their seeming simplicity, are usually orphans of the facilities operation. We are all aware that cooling towers are the step-children of the chemical process plant, electric power generating station, and refrigeration system. While our engineers are pretty well convinced of the importance of their sophisticated equipment, and rightly so, they take the cooling towers and the cold water returning from them for granted. Design Conditions are specified for the particular requirements before a cooling tower is purchased. After it is put on the line and the cold water temperature or volume becomes inadequate, they look to solutions other than the obvious. While all cooling towers are purchased to function at 100% of capability in accordance with the required Design Conditions, in actual on stream employment, the level of operation many times is lower, downwards to as much as 50% due to a variety of reasons: (1) The present service needed is now greater than the original requirements which the tower was purchased for; (2) 'Slippage' due to usage and perhaps deficient maintenance has reduced the performance of the tower over years of operation; (3) The installation could have been originally undersized due to the low bidder syndrome; and (4) New plant expansion needs colder temperatures off the tower.

Burger, R.

1983-01-01T23:59:59.000Z

10

towers of Hanoi  

Science Conference Proceedings (OSTI)

NIST. towers of Hanoi. (classic problem). Definition: Given three posts (towers) and n disks of decreasing sizes, move the ...

2013-08-23T23:59:59.000Z

11

Evaluation and performance enhancement of cooling tower spray zones.  

E-Print Network (OSTI)

??ENGLISH ABSTRACT: The performance of wet cooling towers can be improved by installing spray nozzles that distribute the cooling water uniformly onto the fill whilst… (more)

Roux, Daniel

2012-01-01T23:59:59.000Z

12

OCCUPATIONAL COOLING TOWERS  

E-Print Network (OSTI)

HEALTH SCIENCES LIBRARY COOLING TOWERS EMPLOYEE HEALTH B C D F E CHILDREN'S ELEVATORS MEDICAL SCHOOL

Crews, Stephen

13

Wind Resource Assessment Report: Mille Lacs Indian Reservation, Minnesota  

DOE Green Energy (OSTI)

The U.S. Environmental Protection Agency (EPA) launched the RE-Powering America's Land initiative to encourage development of renewable energy on potentially contaminated land and mine sites. EPA collaborated with the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) and the Mille Lacs Band of Chippewa Indians to evaluate the wind resource and examine the feasibility of a wind project at a contaminated site located on the Mille Lacs Indian Reservation in Minnesota. The wind monitoring effort involved the installation of a 60-m met tower and the collection of 18 months of wind data at multiple heights above the ground. This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and an assessment of the economic feasibility of a potential wind project sited this site.

Jimenez, A. C.

2013-12-01T23:59:59.000Z

14

Cooling Tower Inspection with Scuba  

E-Print Network (OSTI)

A serious problem of scale and other solid material settling in heat transfer equipment was threatening to shut down our ethylene plant. All evidence pointed to the cooling tower as the source of the contamination. Visual inspection of the cooling tower pump suction basin was accomplished by diving into the basin using SCUBA gear. It was possible to see a build-up of debris on the pump suction basket strainers and on the floor of the sumps. Also, it was discovered that one of the four baskets had been installed incorrectly. Photographs of the basket strainers were taken to aid in describing their exact condition. With the aid of SCUBA it was possible to sufficiently clean the pump sumps so that costly downtime was avoided. Likewise, using this technique, steps were taken to greatly reduce the chance for further contamination of the circulating cooling water system.

Brenner, W.

1982-01-01T23:59:59.000Z

15

Cooling Tower Considerations for Energy Optimizations  

E-Print Network (OSTI)

Energy conservation strategies and production economies involve more than examining the cooling tower fan consumption of horse power. Colder water provides vast potentials for savings. Ask yourself, "What is the dollar and energy utilization value if I can obtain 1°F colder water off my cooling tower than I am now getting?" Therefore, let us first examine the elements of the cooling tower to determine the areas of greatest potential improvement to generate that colder water. The air flow generated by the fan should first be looked at In both counterflow or crossflow towers to determine that maximum flow is available through pitching fans up to within the motor plate amperage limitations and fan stall point calculations. If applicable, new fiberglass state of the art fans can be installed and additional motor horse power added. However, the most dramatic improvement that can be obtained in producing colder water is to retrofit modern film fill to replace the old fashioned wood splash bar slats.

Burger, R.

1986-01-01T23:59:59.000Z

16

Energy and protein production from pulp mill wastes. Progress report, June 15, 1976--September 15, 1976. [Staff recruitment and equipment installation  

DOE Green Energy (OSTI)

The first three months of this project were devoted to obtaining the required staff and equipment to execute the program plan. All major pieces of equipment were ordered, have been received and installed. Shake down experiments indicate that the equipment is operable.

Jurgensen, M.F.; Patton, J.T.

1976-09-01T23:59:59.000Z

17

Cooling Tower Technology Conference  

Science Conference Proceedings (OSTI)

Cooling towers and associated systems cause significant loss of availability and heat rate degradation in both nuclear and fossil-fired power plants. Twenty-one papers presented at a 2003 conference in Charleston, South Carolina discussed industrial experience and provided case histories of cooling tower problems and solutions.

2003-08-12T23:59:59.000Z

18

Cooling Towers, The Debottleneckers  

E-Print Network (OSTI)

Power generating plants and petro-chemical works are always expanding. An on-going problem is to identify and de-bottle neck restricting conditions of growth. The cooling tower is a highly visible piece of equipment. Most industrial crossflow units are large structures, Illustration 1. Big budget money and engineering time goes into gleaming stainless steel equipment and exotic process apparatus, the poor cooling tower is the ignored orphan of the system. Knowledgeable Engineers, however, are now looking into the function of the cooling tower, which is to produce colder water- and question the quality of water discharged from that simple appearing box. These cross-flow structures are quite large, ranging up to 60 feet tall with as many as 6 or more cells in a row. With cells up to 42 feet long so immense in aspect, with fans rotating, operators assume, just by appearances, that all is well, and usually pay no attention to the quality of cold water returning from the cooling tower. The boxes look sturdy, but the function of the cooling tower is repeated ignored production of water as cold as possible.

Burger, R.

1998-04-01T23:59:59.000Z

19

China Solar Tower Development | Open Energy Information  

Open Energy Info (EERE)

Tower Development Jump to: navigation, search Name China Solar Tower Development Place China Sector Solar Product Joint venture for development of solar towers in China, announced...

20

Solar power towers  

DOE Green Energy (OSTI)

The high desert near Barstow, California, has witnessed the development of this country`s first two solar power towers. Solar One operated successfully from 1982 to 1988 and proved that power towers work efficiently to produce utility-scale power from sunlight. Solar Two was connected to the utility grid in 1996 and is operating today. Like its predecessor, Solar Two is rated at 10 megawatts. An upgrade of the Solar One plant, Solar Two demonstrates how solar energy can be stored in the form of heat in molten salt for power generation on demand. The experience gained with these two pilot power towers has established a foundation on which industry can develop its first commercial plants. These systems produce electricity on a large scale. They are unique among solar technologies because they can store energy efficiently and cost effectively. They can operate whenever the customer needs power, even after dark or during cloudy weather.

Not Available

1998-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Solar power towers  

DOE Green Energy (OSTI)

The high desert near Barstow, California, has witnessed the development of this country's first two solar power towers. Solar One operated successfully from 1982 to 1988 and proved that power towers work efficiently to produce utility-scale power from sunlight. Solar Two was connected to the utility grid in 1996 and is operating today. Like its predecessor, Solar Two is rated at 10 megawatts. An upgrade of the Solar One plant, Solar Two demonstrates how solar energy can be stored in the form of heat in molten salt for power generation on demand. The experience gained with these two pilot power towers has established a foundation on which industry can develop its first commercial plants. These systems produce electricity on a large scale. They are unique among solar technologies because they can store energy efficiently and cost effectively. They can operate whenever the customer needs power, even after dark or during cloudy weather.

NONE

1998-04-01T23:59:59.000Z

22

Cooling Towers- Energy Conservation Strategies Understanding Cooling Towers  

E-Print Network (OSTI)

Cooling towers are energy conservation devices that Management, more often than not, historically overlooks in the survey of strategies for plant operating efficiencies. The utilization of the colder water off the cooling tower is the money maker!

Smith, M.

1991-06-01T23:59:59.000Z

23

Evan Mills  

NLE Websites -- All DOE Office Websites (Extended Search)

Evan Mills Evan Mills Residential Building Systems Group Lawrence Berkeley National Laboratory 1 Cyclotron Road MS 90R2000 Berkeley CA 94720 Office Location: 90-2058 (510) 486-6784...

24

Corn Milling  

Science Conference Proceedings (OSTI)

... facilities include processing and storage tanks, screening and sizing equipment, grind mills, high pressure steam boilers, centrifuges, rotary ...

25

Proceedings: Cooling Tower Technology Conference  

Science Conference Proceedings (OSTI)

Cooling towers and associated systems performance strongly affect availability and heat rate in fossil and nuclear power plants. Twenty-two papers presented at the 1997 Cooling Tower Technology Conference discuss research results, industry experience, and case histories of cooling tower problems and solutions.

1997-08-13T23:59:59.000Z

26

Pueblo Towers | Open Energy Information  

Open Energy Info (EERE)

Towers Towers Jump to: navigation, search Name Pueblo Towers Facility Pueblo Towers Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Vestas Towers Developer Vestas Towers Energy Purchaser Vestas Towers Location CO Coordinates 38.205834°, -104.588141° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.205834,"lon":-104.588141,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

27

Cooling Towers - Energy Conservation and Money Making Mechanisms  

E-Print Network (OSTI)

The utilization of colder water conserves energy, creates profits, increases product output. In an effort to obtain greater efficiencies and conserve both energy and dollars, all too many engineers neglect the potential of the cooling tower. Many cooling towers in operation are performing at levels as low as 50% of capability. This is energy wasteful and financially foolish. There are many reasons for this deficiency, among them the present service is greater than the original requirements, slippage due to age and deterioration, or the installation could have been originally installed undersized. This paper will investigate the various elements, their functions and methods of upgrading their performance by retrofit with the use of modern technology. Case histories will be examined in three major industries, chemicals, refrigeration and petrochemical illustrating how intelligent rebuilding can produce profits and conserve energy. Actual statistics will be cited showing that the return of investment (ROI) can be quite rapid by optimizing the performance of the cooling tower.

Burger, R.

1981-01-01T23:59:59.000Z

28

Cassie Mills  

Energy.gov (U.S. Department of Energy (DOE))

Cassie Mills is a communications associate in the Advanced Manufacturing Office in the Office of Energy Efficiency and Renewable Energy.

29

Abstract On the Automorphism Tower  

E-Print Network (OSTI)

In this thesis I study the automorphism tower of free nilpotent groups. Our main tool in studying the automorphism tower is to embed every group as a lattice in some Lie group. Using known rigidity results the automorphism group of the discrete group can be embedded into the automorphism group of the Lie group. This allows me to lift the description of the derivation tower of the free nilpotent Lie algebra to obtain information about the automorphism tower of the free nilpotent group. The main result in this thesis states that the automorphism tower of the free nilpotent group ?(n, d) on n generators and nilpotency class d, stabilizes after finitely many steps. If the nilpotency class is small compared to the number of generators we have that the height of the automorphism tower is at most

Of Free Nilpotent Groups; Martin Dimitrov Kassabov

2003-01-01T23:59:59.000Z

30

Seismic analysis of lattice towers.  

E-Print Network (OSTI)

??In the absence of specific guidelines for the seismic analysis of self-supporting telecommunication towers, designers may be tempted to apply simplified building code approaches to… (more)

Khedr, Mohamed Abdel Halim.

1998-01-01T23:59:59.000Z

31

Cooling-tower rebuild, treatment overhaul halt fouling  

SciTech Connect

Partial fixes over a period of time were insufficient to meet cooling requirements at this four-tower powerplant. The eventual remedy involved complete fill replacement and chemistry-program revision. Cooling-tower performance hinges on many factors. Assuming the proper water and air distribution and unhindered operation of spray nozzles, pumps, valves, etc, fill design is the key element. However, a decade of experience at Keystone station (operated by Pennsylvania Electric Co for a consortium of East Coast utilities) showed that more than just changing to a fouling-resistant fill was required to provide and maintain design performance. As described in this article, careful analysis, revision, and continuous monitoring of the chemical water-treatment program were needed as well. At each of Keystone's two units, two natural-draft, hyperbolic towers provide cooling for main-condenser circulating water and service water. The 325-ft-tall towers are counter-current flow, and measure 247 ft across the basin. Film-type fill originally installed in the towers consisted of assemblies of fiber-cement board, 9 ft deep in the center and 7 ft in the peripheral regions. Fiber-cement was also the construction material used in the drift eliminators, and in the piping connected to concrete distribution flumes within the towers.

Gall, G.P.

1993-02-01T23:59:59.000Z

32

FLORIDA TOWER FOOTPRINT EXPERIMENTS  

SciTech Connect

The Florida Footprint experiments were a series of field programs in which perfluorocarbon tracers were released in different configurations centered on a flux tower to generate a data set that can be used to test transport and dispersion models. These models are used to determine the sources of the CO{sub 2} that cause the fluxes measured at eddy covariance towers. Experiments were conducted in a managed slash pine forest, 10 km northeast of Gainesville, Florida, in 2002, 2004, and 2006 and in atmospheric conditions that ranged from well mixed, to very stable, including the transition period between convective conditions at midday to stable conditions after sun set. There were a total of 15 experiments. The characteristics of the PFTs, details of sampling and analysis methods, quality control measures, and analytical statistics including confidence limits are presented. Details of the field programs including tracer release rates, tracer source configurations, and configuration of the samplers are discussed. The result of this experiment is a high quality, well documented tracer and meteorological data set that can be used to improve and validate canopy dispersion models.

WATSON,T.B.; DIETZ, R.N.; WILKE, R.; HENDREY, G.; LEWIN, K.; NAGY, J.; LECLERC, M.

2007-01-01T23:59:59.000Z

33

Hydraulic Cooling Tower Driver- The Innovation  

E-Print Network (OSTI)

One of the weaknesses of present day cooling tower drives are fan wrecks caused by shaft couplings breaking, gear box malfunctions due to inadequate lubrication, gear tooth wear, and inaccessibility for inspection and routine maintenance. The hydro-drive eliminates these items from the drive train and puts the same electric motor HP at ground level close coupled to a hydraulic pump, filters, and oil reservoir. Hydraulic lines bring oil pressure to the hydraulic motor, which is more than 75% less weight than comparable gear boxes and presents a smooth practically trouble free performance. In this three cell installation, the original 75 horsepower motors and 18’ diameter fans were cooling a total of 14,000 GPM which were CTI tested and 74.7% of capability. The upgrading and retrofit consisted of installing at ground level 100 horse power motors, 22’ diameter fans, 14’ high velocity recovery fan cylinders, “V” PVC splash bars, and high efficiency cellular drift eliminators. Testing after completion indicated a 92% tower now circulating 21,000 GPM instead of the original 14,000.

Dickerson, J. A.

1987-09-01T23:59:59.000Z

34

Flux Sampling Errors for Aircraft and Towers  

Science Conference Proceedings (OSTI)

Various errors and influences leading to differences between tower- and aircraft-measured fluxes are surveyed. This survey is motivated by reports in the literature that aircraft fluxes are sometimes smaller than tower-measured fluxes. Both tower ...

L. Mahrt

1998-04-01T23:59:59.000Z

35

Thermal performance of cooling towers  

SciTech Connect

Wet cooling towers are often used in HVAC applications to reject heat to the atmosphere. Heat rejection is accomplished within the tower by heat and mass transfer between hot water droplets and ambient air. These heat and mass transfer processes and the resulting coefficient of performance are often misunderstood and misinterpreted. To demystify these concepts, the heat and mass transfer exchange at the water droplet level are reviewed. This is followed by an analysis of an idealized spray-type tower to show how cooling tower performance is affected by fill height, water retention time, and air and water mass flow rates. Finally, the so-called coefficient of performance of cooling towers is examined.

Bernier, M.A. [Ecole Polytechnique de Montreal, Quebec (Canada)

1995-04-01T23:59:59.000Z

36

Evan Mills  

NLE Websites -- All DOE Office Websites (Extended Search)

Evan Mills Evan Mills Evan Mills Residential Building Systems Group Lawrence Berkeley National Laboratory 1 Cyclotron Road MS 90R2000 Berkeley CA 94720 Office Location: 90-2058 (510) 486-6784 EMills@lbl.gov Evan Mills is a Staff Scientist in the Building Technology and Urban Systems Department, and has worked in the energy efficiency field since 1982. His core commercial-buildings expertise is in energy benchmarking, commissioning, high-tech buildings, risk management, and the efficiency business case. He is a frequent speaker to academic and industry audiences on buildings energy efficiency, author of over 200 publications, and member of the Intergovernmental Panel on Climate Change, which shared the 2007 Nobel Peace Prize. He is recipient of an R&D 100 award for commercializing

37

Andrew Mills  

NLE Websites -- All DOE Office Websites (Extended Search)

Andrew D. Mills Andrew D. Mills Andrew Mills Electricity Markets and Policy Group Lawrence Berkeley National Laboratory 1 Cyclotron Road MS 90R4000 Berkeley CA 94720 Office Location: 90-4126J (510) 486-4059 ADMills@lbl.gov Andrew D. Mills is a Principal Research Associate in the Electricity Markets and Policy Group at Lawrence Berkeley National Laboratory. Andrew conducts research and provides policy analysis on renewables and transmission, including power system operations and valuation of wind and solar. Andrew's has published his research in Energy Policy and was a contributing author to the IPCC Special Report on Renewable Energy. Previously, Andrew worked with All Cell Technologies, a battery technologystart-up company. Andrew has an M.S. in Energy and Resources from UC Berkeley and a B.S. in

38

OUT Success Stories: Power Towers  

DOE Green Energy (OSTI)

Power towers convert the thermal energy of the sun to electricity. They are large-scale power plants producing clean energy and suited for operation in sunny, semi-arid regions of the world.

Jones, J.

2000-08-31T23:59:59.000Z

39

Cooling Towers, Energy Conservation Machines  

E-Print Network (OSTI)

Cooling towers, in all too many industrial plants, are often the neglected units of the process chain which are hidden bonanzas for energy conservation and dollar savings. By lowering the entire systems temperature by the use of colder water returning from the cooling tower, greater chemical product volume can be condensed and less energy is required to run compressors. This paper will discuss two case histories and the rapid cost-effective savings thereby accruing through retrofit.

Burger, R.

1980-01-01T23:59:59.000Z

40

SMUD Kokhala Power Tower Study  

DOE Green Energy (OSTI)

Kokhala is the name of a new hybridized power tower design which integrates a nitrate-salt solar power tower with a gas turbine combined-cycle power plant. This integration achieves high value energy, low costs, and lower investor risk than a conventional solar only power tower plant. One of the primary advantages of this system is that it makes small power tower plants much more economically competitive with conventional power generation technologies. This paper is an overview of a study that performed a conceptual evaluation of a small (30 MWe) commercial plant suitable for the Sacramento Municipal Utility District`s (SMUD) Rancho Seco power plant site near Sacramento, California. This paper discusses the motivation for using a small hybrid solar plant and provides an overview of the analysis methodology used in the study. The results indicate that a power tower integrated with an advanced gas turbine, combined with Sacramento`s summer solar resource, could produce a low- risk, economically viable power generation project in the near future.

Price, Henry W. [National Renewable Energy Laboratory, Golden, CO (United States); Whitney, Daniel D.; Beebe, H.I. [Sacramento Municipal Utility District, CA (United States)

1997-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Oriented spray-assisted cooling tower  

Science Conference Proceedings (OSTI)

Apparatus useful for heat exchange by evaporative cooling when employed in conjunction with a conventional cooling tower. The arrangement includes a header pipe which is used to divert a portion of the water in the cooling tower supply conduit up stream of the cooling tower to a multiplicity of vertical pipes and spray nozzles which are evenly spaced external to the cooling tower so as to produce a uniform spray pattern oriented toward the central axis of the cooling tower and thereby induce an air flow into the cooling tower which is greater than otherwise achieved. By spraying the water to be cooled towards the cooling tower in a region external to the cooling tower in a manner such that the spray falls just short of the cooling tower basin, the spray does not interfere with the operation of the cooling tower, proper, and the-maximum increase in air velocity is achieved just above the cooling tower basin where it is most effective. The sprayed water lands on a concrete or asphalt apron which extends from the header pipe to the cooling tower basin and is gently sloped towards the cooling tower basin such that the sprayed water drains into the basin. By diverting a portion of the water to be cooled to a multiplicity of sprays external to the cooling tower, thermal performance is improved. 4 figs.

Bowman, C.F.

1995-04-18T23:59:59.000Z

42

Military installations  

Science Conference Proceedings (OSTI)

This report has reviewed the use of U.S. coal at DOD installations in West Germany. DOD reported that between April 1, 1988, and December 31, 1988, it had between 306,000 and 419,000 tons of U.S. coal stored in Germany. About two-thirds of that was anthracite coal. GAO visited six coal-handling locations that accounted for 72 to 79 percent of the total U.S. coal between April and December 1988. This report could not verify the official inventory records at five locations - two Air Force and three Army - for several reasons, including a lack of required physical inventories of coal for recent years. DOD's coal consumption data for fiscal year 1988 appeared to be accurate since it matched the data reported on source documents maintained at the installations and their commands. According to reported DOD coal inventory and consumption data, as of September 30, 1988, DOD had enough anthracite coal on hand to satisfy projected demands through at least fiscal year 1993, given that no additional heating plant conversions other than those already approved occur and no additional shipments of coal occur. DOD said that as of September 30, 1988, it facilities in Germany had enough anthracite coal on hand to last a minimum of five years.

Not Available

1990-03-01T23:59:59.000Z

43

Power Tower Systems for Concentrating Solar Power  

Energy.gov (U.S. Department of Energy (DOE))

In power tower concentrating solar power systems, numerous large, flat, sun-tracking mirrors, known as heliostats, focus sunlight onto a receiver at the top of a tall tower. A heat-transfer fluid...

44

ARM - Campaign Instrument - aerosol-tower-eml  

NLE Websites -- All DOE Office Websites (Extended Search)

govInstrumentsaerosol-tower-eml Comments? We would love to hear from you Send us a note below or call us at 1-888-ARM-DATA. Send Campaign Instrument : EML Tower based Aerosol...

45

Sorting in Patrick Geddes' Outlook Tower  

E-Print Network (OSTI)

i n g in P a t r i c k Outlook Tower Geddes' JČ Joyce Barleythree months at the Outlook 'lower in Edinburgh, sorting theand services. • The Outlook Tower was a disused observatory

Earley, Joyce

1991-01-01T23:59:59.000Z

46

GreenTower | Open Energy Information  

Open Energy Info (EERE)

GreenTower Jump to: navigation, search Name GreenTower Place Haiger 6, Germany Zip 35708 Sector Solar Product Developer of a solar chimney technology, with greenhouses for food...

47

Proceedings of the Cooling Tower Technology Conference  

Science Conference Proceedings (OSTI)

The performance of cooling towers and associated systems strongly affects availability and heat rate in fossil and nuclear power plants. Twenty-four papers presented at the 2012 Cooling Tower Technology Conference, held August 8–9, 2012, in Pensacola, Florida, discuss research results, industry experience, and case histories of cooling tower problems and solutions. ...

2012-09-13T23:59:59.000Z

48

Proceedings: Cooling Tower and Advanced Cooling Systems Conference  

Science Conference Proceedings (OSTI)

Cooling towers and associated systems performance strongly affects availability and heat rate in fossil and nuclear power plants. Papers presented at EPRI's 1994 Cooling Tower and Advanced Cooling Systems Conference discuss research results, industry experience, and case histories of cooling tower problems and solutions. Specific topics include cooling tower upgrades and retrofits, cooling tower performance, cooling tower fouling, and dry and hybrid cooling systems.

1995-03-09T23:59:59.000Z

49

Cooling Tower Fan Motor Power Optimization Study  

Science Conference Proceedings (OSTI)

Cooling towers are in use at more than 200 major electric generating plants in the United States, representing approximately 800 units and a total of more than 210,000 MW. The auxiliary power consumed by cooling tower fan motors can significantly reduce the net power output of steam-cycle power plants. Cooling tower specifications are established by the economic and operational requirements of maximum unit load and the most demanding environmental conditions expected in the tower’s locale. Since power pl...

2011-11-16T23:59:59.000Z

50

Hydrogen Storage in Wind Turbine Towers  

DOE Green Energy (OSTI)

Low-cost hydrogen storage is recognized as a cornerstone of a renewables-hydrogen economy. Modern utility-scale wind turbine towers are typically conical steel structures that, in addition to supporting the rotor, could be used to store hydrogen. This study has three objectives: (1) Identify the paramount considerations associated with using a wind turbine tower for hydrogen storage; (2)Propose and analyze a cost-effective design for a hydrogen-storing tower; and (3) Compare the cost of storage in hydrogen towers to the cost of storage in conventional pressure vessels. The paramount considerations associated with a hydrogen tower are corrosion (in the form of hydrogen embrittlement) and structural failure (through bursting or fatigue life degradation). Although hydrogen embrittlement (HE) requires more research, it does not appear to prohibit the use of turbine towers for hydrogen storage. Furthermore, the structural modifications required to store hydrogen in a tower are not cost prohibitive.

Kottenstette, R.; Cotrell, J.

2003-09-01T23:59:59.000Z

51

Cargill Corn Milling North America  

Science Conference Proceedings (OSTI)

... Manufacturing. Cargill Corn Milling North America. Cargill employees (Photo courtesy of Cargill Corn Milling North America). ...

2010-11-23T23:59:59.000Z

52

Table 11.6 Installed Nameplate Capacity of Fossil-Fuel Steam-Electric Generators With Environmental Equipment, 1985-2010 (Megawatts)  

U.S. Energy Information Administration (EIA) Indexed Site

Installed Nameplate Capacity of Fossil-Fuel Steam-Electric Generators With Environmental Equipment," Installed Nameplate Capacity of Fossil-Fuel Steam-Electric Generators With Environmental Equipment," " 1985-2010 (Megawatts)" "Year","Coal",,,,"Petroleum and Natural Gas",,,,"Total 1" ,,,"Flue Gas","Total 2",,,"Flue Gas","Total 2",,,"Flue Gas","Total 2" ,"Particulate","Cooling","Desulfurization",,"Particulate","Cooling","Desulfurization",,"Particulate","Cooling","Desulfurization" ,"Collectors","Towers","(Scrubbers)",,"Collectors","Towers","(Scrubbers)",,"Collectors","Towers","(Scrubbers)"

53

Vortex-augmented cooling tower - windmill combination  

DOE Patents (OSTI)

A cooling tower for cooling large quantities of effluent water from a production facility by utilizing natural wind forces includes the use of a series of helically directed air inlet passages extending outwardly from the base of the tower to introduce air from any direction in a swirling vortical pattern while the force of the draft created in the tower makes it possible to place conventional power generating windmills in the air passage to provide power as a by-product.

McAllister, J.E. Jr.

1982-09-02T23:59:59.000Z

54

Studies on Mathematical Models for Characterizing Plume and Drift Behavior from Cooling Towers, Volume 2: Mathematical Model for Sin gle Source (Single Tower) Cooling Tower Plume Dispersion  

Science Conference Proceedings (OSTI)

Presents an improved model for plumes from single natural-draft cooling towers. This model is expanded to treat multiple tower plumes in Volume 4.

1981-01-01T23:59:59.000Z

55

Upcoming Funding Opportunity for Tower Manufacturing and ...  

... and Lower Cost of Energy" intends to support partnerships leading to innovative designs and processes for wind turbine tower manufacturing and ...

56

Failure of Cooling Tower West Virginia 1978  

Science Conference Proceedings (OSTI)

... The Willow Island disaster was the collapse of a cooling tower under ... In response to this request, NBS carried out field, laboratory and analytical ...

2011-08-12T23:59:59.000Z

57

Combined-cycle power tower  

DOE Green Energy (OSTI)

This paper evaluates a new power tower concept that offers significant benefits for commercialization of power tower technology. The concept uses a molten nitrate salt centralreceiver plant to supply heat, in the form of combustion air preheat, to a conventional combined-cycle power plant. The evaluation focused on first commercial plants, examined three plant capacities (31, 100, and 300 MWe), and compared these plants with a solar-only 100-MWe plant and with gas-only combined-cycle plants in the same three capacities. Results of the analysis point to several benefits relative to the solar-only plant including low energy cost for first plants, low capital cost for first plants, reduced risk with respect to business uncertainties, and the potential for new markets. In addition, the concept appears to have minimal technology development requirements. Significantly, the results show that it is possible to build a first plant with this concept that can compete with existing gas-only combined-cycle plants.

Bohn, M.S.; Williams, T.A.; Price, H.W.

1994-10-01T23:59:59.000Z

58

Optimizing Cooling Tower Performance Refrigeration Systems, Chemical Plants, and Power Plants All Have A Resource Quietly Awaiting Exploitation-Cold Water!!  

E-Print Network (OSTI)

Cooling towers, because of their seeming simplicity, are usually orphans of the facilities operation. We are all aware that cooling towers are the step-children of the chemical process plant, electric power generating station, and refrigeration system. While engineers are pretty well convinced of the importance of their sophisticated equipment, and rightly so, they take the cooling towers and the cold water returning from them for granted. Design Conditions are specified for the particular requirements before a cooling tower is purchased. This relates to the volume of circulating water, hot water temperature on the tower, cold water discharge, and wet bulb temperature (consisting of ambient temperature and relative humidity). After the tower is put on the line and the cold water temperature or volume becomes inadequate, engineers look to solutions other than the obvious. While all cooling towers are purchased to function at 100% of capability in accordance with the required Design Conditions, in actual on-stream employment, the level of operation many times is lower, downwards to as much as 50% due to a variety of reasons: 1. The present service needed is now greater than the original requirements which the tower was purchased for. 2. “Slippage” due to usage and perhaps deficient maintenance has reduced the performance of the tower over years of operation. 3. The installation could have been originally undersized due to the low bidder syndrome. 4. New plant expansion needs additional water volume and possibly colder temperatures off the tower.

Burger, R.

1991-06-01T23:59:59.000Z

59

Optimizing Cooling Tower Performance- Refrigeration Systems, Chemical Plants, and Power Plants all Have A Resource Quietly Awaiting Exploitation-Cold Water!!  

E-Print Network (OSTI)

Cooling towers, because of their seeming simplicity, are usually orphans of the facilities operation. We are all aware that cooling towers are the step-children of the chemical process plant, electric power generating station, and refrigeration system. While engineers are pretty well convinced of the importance of their sophisticated equipment, and rightly so, they take the cooling towers and the cold water returning from them for granted. Design Conditions are specified for the particular requirements before a cooling tower is purchased. This relates to the volume of circulatlng water, hot water temperature on the tower, cold water temperature discharge, and wet bulb temperature (consisting of ambient temperature and relative humidity). After the tower is put on the line and the cold water temperature or volume becomes inadequate, engineers look to solutions other than the obvious. While all cooling towers are purchased to function at 100% of capability in accordance with the required Design Conditions, in actual on-stream employment, the level of operation many times is lower, downwards to as much as 50% due to a variety of reasons: 1. The present service needed is now greater than the original requirements which the tower was purchased for. 2. "Slippage" due to usage and perhaps deficient maintenance has reduced the performance of the tower over years of operation. 3. The installation could have been originally undersized due to the low bidder syndrome (1). 4. New plant expansion needs additional water volume and possibly colder temperatures off the tower.

Burger, R.

1990-06-01T23:59:59.000Z

60

WIND DATA REPORT WBZ Tower, Hull, MA  

E-Print Network (OSTI)

WIND DATA REPORT WBZ Tower, Hull, MA 9/1/06-11/30/06 Prepared for Department of Energy (DOE) Golden the closest tower leg The data from the SecondWind Nomad2 logger is emailed to the Renewable Energy Research Energy Research Laboratory Page 10 University of Massachusetts, Amherst Amherst, MA 01003 #12;Wind Speed

Massachusetts at Amherst, University of

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Radar Measurement of Cooling Tower Drift  

Science Conference Proceedings (OSTI)

A method of radar measurement of drift, generated by the wet cooling towers of power plants, is proposed. The water given off by the evaporative towers consists of two kinds of droplets: the recondensation droplets—generally less than 20 ?m in ...

Henri Sauvageot

1989-09-01T23:59:59.000Z

62

2006 EPRI Cooling Tower Technology Conference Proceedings  

Science Conference Proceedings (OSTI)

Cooling towers and associated systems cause significant loss of availability and heat rate degradation in both nuclear and fossil-fired power plants. Fifteen papers presented at a 2006 Conference in Des Moines, Iowa discussed industrial experience and provided case histories of cooling tower problems and solutions.

2006-08-01T23:59:59.000Z

63

SunShot Initiative: CSP Tower Air Brayton Combustor  

NLE Websites -- All DOE Office Websites (Extended Search)

CSP Tower Air Brayton Combustor to someone by E-mail Share SunShot Initiative: CSP Tower Air Brayton Combustor on Facebook Tweet about SunShot Initiative: CSP Tower Air Brayton...

64

Wind turbine tower for storing hydrogen and energy  

DOE Patents (OSTI)

A wind turbine tower assembly for storing compressed gas such as hydrogen. The tower assembly includes a wind turbine having a rotor, a generator driven by the rotor, and a nacelle housing the generator. The tower assembly includes a foundation and a tubular tower with one end mounted to the foundation and another end attached to the nacelle. The tower includes an in-tower storage configured for storing a pressurized gas and defined at least in part by inner surfaces of the tower wall. In one embodiment, the tower wall is steel and has a circular cross section. The in-tower storage may be defined by first and second end caps welded to the inner surface of the tower wall or by an end cap near the top of the tower and by a sealing element attached to the tower wall adjacent the foundation, with the sealing element abutting the foundation.

Fingersh, Lee Jay (Westminster, CO)

2008-12-30T23:59:59.000Z

65

NIST Net installation instructions  

Science Conference Proceedings (OSTI)

... Xaw3d, and neXtaw; Build and install the nistnet module, API library, and user interface make make install; Try things out ...

2013-09-12T23:59:59.000Z

66

PETSc: Documentation: Installation  

NLE Websites -- All DOE Office Websites (Extended Search)

Installation Home Download Features Documentation Manual pages and Users Manual Citing PETSc Tutorials Installation AMS Changes Bug Reporting Code Management FAQ License Linear...

67

Composite Tower Solutions | Open Energy Information  

Open Energy Info (EERE)

Solutions Solutions Jump to: navigation, search Name Composite Tower Solutions Place Provo, Utah Zip 84604 Sector Wind energy Product Composite Tower Solutions manufactures equipment for wind resource assessment needs, including meteorological towers, weather towers, and data collection and instrumentation towers. Coordinates 40.233765°, -111.668509° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.233765,"lon":-111.668509,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

68

Installing and Maintaining a Small Wind Electric System | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System Installing and Maintaining a Small Wind Electric System July 2, 2012 - 8:22pm Addthis Installing and Maintaining a Small Wind Electric System What does this mean for me? When installing a wind system, the location of the system, the energy budget for the site, the size of the system, and the height of the tower are important elements to consider. Deciding whether to connect the system to the electric grid or not is also an important decision. If you went through the planning steps to evaluate whether a small wind electric system will work at your location, you will already have a general idea about: The amount of wind at your site The zoning requirements and covenants in your area The economics, payback, and incentives of installing a wind system

69

Federal Energy Management Program: Best Management Practice: Cooling Tower  

NLE Websites -- All DOE Office Websites (Extended Search)

Cooling Tower Management to someone by E-mail Cooling Tower Management to someone by E-mail Share Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Facebook Tweet about Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Twitter Bookmark Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Google Bookmark Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Delicious Rank Federal Energy Management Program: Best Management Practice: Cooling Tower Management on Digg Find More places to share Federal Energy Management Program: Best Management Practice: Cooling Tower Management on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

70

Cooling Tower Report, October 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2008 Electricity Reliability Impacts of a Mandatory Cooling Tower Rule for Existing Steam Generation Units Cooling Tower Report, October 2008 More Documents & Publications...

71

Capacity Assessment of a Transmission Tower under Wind Loading.  

E-Print Network (OSTI)

??Transmission towers play a vital role in power distribution networks and are often subject to strong wind loads. Lattice tower design is often based on… (more)

Mara, Thomas G

2013-01-01T23:59:59.000Z

72

Building a Better Transmission Tower | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

software that helped them build cheaper but sturdier towers for new high-voltage transmission lines. Their new towers are stronger but use less steel. They better...

73

Milling Techniques - TMS  

Science Conference Proceedings (OSTI)

February 4-8 · 1996 TMS ANNUAL MEETING · Anaheim, California. SYNTHESIS AND PROCESSING OF NANOCRYSTALLINE POWDER III: Milling Techniques ...

74

Microsoft Word - CX-Marion and Sand Springs Substation Towers Revised.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEC-4 KEC-4 SUBJECT: Environmental Clearance Memorandum Dave Tripp Project Manager - TEP-CSB-1 Proposed Action: Marion and Sand Springs Substations Radio Tower Projects Budget Information: Work Orders 00243411 and 00243190; Task 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Siting, construction, and operation of microwave and radio communication towers and associated facilities... Location: Marion and Deschutes counties, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to install new radio towers at the Marion Substation and Sand Springs Substation communication sites in Oregon. BPA must vacate radio frequencies in the 1710-1755MHz band to comply with a Federal law mandating reallocation of

75

Best Management Practice: Cooling Tower Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Best Management Practice: Cooling Tower Management Best Management Practice: Cooling Tower Management Best Management Practice: Cooling Tower Management October 8, 2013 - 9:39am Addthis Cooling towers regulate temperature by dissipating heat from recirculating water used to cool chillers, air-conditioning equipment, or other process equipment. Heat is rejected from the tower primarily through evaporation. Therefore, by design, cooling towers consume significant amounts of water. Overview The thermal efficiency and longevity of the cooling tower and equipment used to cool depend on the proper management of water recirculated through the tower. Water leaves a cooling tower system in any one of four ways: Evaporation: This is the primary function of the tower and is the method that transfers heat from the cooling tower system to the

76

Noise from cooling towers of power parks  

SciTech Connect

A study is presented of the noise pollution problem for large power parks proposed for the future. Such parks might have an area of about 75 sq. miles, and a generating capacity up to 48000 MW. A comparative analysis has been done for natural and mechanical-draft wet towers as the major sources of acoustic power. Noise radiation from single isolated towers as well as from a dispersed array of towers has been considered for both types of cooling systems. Major noise attenuation effects considered are due to the atmospheric absorption and A- weighting. Conditions of 60F and 70 percent relative humidity in a still atmosphere have been assumed. (auth)

Zakaria, J.; Moore, F.K.

1975-10-14T23:59:59.000Z

77

Projective preservation : reframing Rudolph's Tower for Boston  

E-Print Network (OSTI)

By 2012, the fate of Paul Rudolph's tower in downtown Boston has been in question for years while a vision of a denser city calls for its demolition. Projected development on the site currently argues that to move forward, ...

Turner, Jessica K

2012-01-01T23:59:59.000Z

78

Cooling Towers--Energy Conservation Strategies  

E-Print Network (OSTI)

A cooling water system can be optimized by operating the cooling tower at the highest possible cycles of concentration without risking sealing and fouling of heat exchanger surfaces, tube bundles, refrigeration equipment, overhead condensers, and other associates heat rejection equipment.

Matson, J.

1991-06-01T23:59:59.000Z

79

On thermal performance of seawater cooling towers  

E-Print Network (OSTI)

Seawater cooling towers have been used since the 1970s in power generation and other industries, so as to reduce the consumption of freshwater. The salts in seawater are known to create a number of operational problems, ...

Sharqawy, Mostafa H.

80

Advanced wet-dry cooling tower concept  

E-Print Network (OSTI)

The purpose of this years' work has been to test and analyze the new dry cooling tower surface previously developed. The model heat transfer test apparatus built last year has been instrumented for temperature, humidity ...

Snyder, Troxell Kimmel

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Assessment of Tall Wind Tower Technology  

Science Conference Proceedings (OSTI)

Technologies that enable wind turbines to capture more energy at a given site have the potential to reduce the overall cost of energy, thereby making wind power more competitive against conventional power generation. Because wind speed generally increases with height above ground, one way to increase energy capture is to elevate the rotor by means of a taller tower. To exploit this potential, a number of tall tower models are under development or have recently been introduced to the wind energy market. I...

2011-11-08T23:59:59.000Z

82

FILES- COOLING TOWER PLUME MODELING  

E-Print Network (OSTI)

Ladies and Gentlemen:? In the referenced letter, Progress Energy Carolinas, Inc. (PEC) noted that the input and output' files for the modeling analysis for cooling tower plumes would be provided under a separate cover. due to the requirements for native file submittal (see NRC RAI # 5.3.3.1-1 and PGN RAI # H-295). The purpose of this letter is to submit these calculation native files. The supplemental information contained in the files on the attached CD is provided to support the NRC's review of the Shearon Harris Nuclear Power Plant Units 2 and 3 (HAR) Environmental Report (ER), but does not comply with the requirements for electronic submission in the NRC Guidance Document. The NRC staff requested the files be submitted in their native formats, required for utilization in the software employed to support the ER development. As discussed with the NRC's environmental project manager responsible for review of the HAR ER, the data provided on the attached CD are of a nature that is not easily convertible to PDF output files. Furthermore, PEC understands that converting the information to PDF output files; would not serve the underlying purpose of the submittal; i.e., to provide the raw, unprocessed data to enable reviewers to evaluate software used in the HAR application. Enclosure 1 provides a list of folders with the requested data files that are included on the attached CD (Attachment 5.3.3.1-1 SACTI Native Files). If you have any further questions, or need additional information, please contact Bob Kitchen at

Garry D. Mi Er

2009-01-01T23:59:59.000Z

83

Geothermal Mill Redevelopment Project in Massachusetts  

DOE Green Energy (OSTI)

Anwelt Heritage Apartments, LLC redeveloped a 120-year old mill complex into a mixed-use development in a lower-income neighborhood in Fitchburg, Massachusetts. Construction included 84 residential apartments rented as affordable housing to persons aged 62 and older. The Department of Energy (“DOE”) award was used as an essential component of financing the project to include the design and installation of a 200 ton geothermal system for space heating and cooling.

Vale, A.Q.

2009-03-17T23:59:59.000Z

84

Solar two: A molten salt power tower demonstration  

Science Conference Proceedings (OSTI)

A consortium of United States utility concerns led by the Southern California Edison Company (SCE) is conducting a cooperative project with the US Department of Energy (DOE), Sandia National Laboratories, and industry to convert the 10-MW Solar One Power Tower Pilot Plant to molten nitrate salt technology. The conversion involves installation of a new receiver, a new thermal storage system, and a new steam generator; it utilizes Solar One`s heliostat field and turbine generator. Successful operation of the converted plant, called Solar Two, will reduce economic risks in building initial commercial power tow projects and accelerate the commercial acceptance of this promising renewable energy technology. The estimated cost of Solar Two, including its three-year test period, is $48.5 million. The plant will begin operation in early 1996.

Tyner, C.E. [Sandia National Labs., Albuquerque, NM (United States); Sutherland, J.P. [Southern California Edison, Rosemead, CA (United States); Gould, W.R. Jr. [Bechtel Corp., San Francisco, CA (United States)

1995-08-01T23:59:59.000Z

85

Wet cooling towers: rule-of-thumb design and simulation  

DOE Green Energy (OSTI)

A survey of wet cooling tower literature was performed to develop a simplified method of cooling tower design and simulation for use in power plant cycle optimization. The theory of heat exchange in wet cooling towers is briefly summarized. The Merkel equation (the fundamental equation of heat transfer in wet cooling towers) is presented and discussed. The cooling tower fill constant (Ka) is defined and values derived. A rule-of-thumb method for the optimized design of cooling towers is presented. The rule-of-thumb design method provides information useful in power plant cycle optimization, including tower dimensions, water consumption rate, exit air temperature, power requirements and construction cost. In addition, a method for simulation of cooling tower performance at various operating conditions is presented. This information is also useful in power plant cycle evaluation. Using the information presented, it will be possible to incorporate wet cooling tower design and simulation into a procedure to evaluate and optimize power plant cycles.

Leeper, S.A.

1981-07-01T23:59:59.000Z

86

WindPACT Rotor Design Study: Hybrid Tower Design; Period of Performance: 29 June 2000 -- 28 February 2004  

DOE Green Energy (OSTI)

The cost of a wind turbine tower can represent as much as 20% of the cost of an entire megawatt-scale horizontal axis wind turbine (HAWT) and as much as 10% of the total cost of energy. The tower is a major cost component, and its design is important: Its structural properties are key to the response of the rotor; its height determines the wind regime that the rotor experiences; it allows access to the turbine nacelle and rotor; and it houses components of the electrical connection and the control and protection systems. Most large wind turbines installed in the United States use self-supporting steel tubular towers. The diameter of these tubes is limited by the size that can be transported by road (approximately 4.3 m). The base dimensions of a truss tower are not restrained by this limit, but trusses may require more maintenance. Guyed tube towers have been used, but they represent additional foundation costs and inconvenience. Addressing these limitations may lead to an alternative that avoids the problems. For this reason, the WindPACT Rotor Design Study was modified to include a study of a hybrid tower to determine the technical and economic feasibility of such a design.

Malcolm, D. J.

2004-04-01T23:59:59.000Z

87

Wind Turbine Towers Establish New Height Standards and Reduce Cost of Wind Energy  

Energy.gov (U.S. Department of Energy (DOE))

Case study that summarizes the Wind Tower Systems and its Space Frame tower. Describes their new wind tower design and explains how DOE funding made this possible.

88

Best Practice for Energy Efficient Cleanrooms: Cooling tower and condenser water optimization  

E-Print Network (OSTI)

Efficient Cleanrooms: Cooling Tower and Condenser WaterEfficient Cleanrooms: Cooling tower and condenser water2 Cooling tower and condenser water

Xu, Tengfang

2005-01-01T23:59:59.000Z

89

Best Practice for Energy Efficient Cleanrooms: Cooling tower and condenser water optimization  

E-Print Network (OSTI)

Cleanrooms: Cooling Tower and Condenser Water OptimizationCleanrooms: Cooling tower and condenser water optimization2 Cooling tower and condenser water

Xu, Tengfang

2005-01-01T23:59:59.000Z

90

Radio Towers Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Radio Towers Geothermal Area Radio Towers Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Radio Towers Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.03666667,"lon":-115.4566667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

91

Reflectivity software installation  

Science Conference Proceedings (OSTI)

... First download and unpack the reflectometry source tree. You may need to build and install Tcl/Tk, BLT, TkTable, BWidget and TkCon. ...

92

Broadwind Energy Formerly Tower Tech Holdings | Open Energy Information  

Open Energy Info (EERE)

Broadwind Energy Formerly Tower Tech Holdings Broadwind Energy Formerly Tower Tech Holdings Jump to: navigation, search Name Broadwind Energy (Formerly Tower Tech Holdings) Place Manitowoc, Wisconsin Zip 54221-1957 Sector Wind energy Product US-based manufacturer of wind turbine towers, turbine assemblies such as nacelles, and monopiles. References Broadwind Energy (Formerly Tower Tech Holdings)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Broadwind Energy (Formerly Tower Tech Holdings) is a company located in Manitowoc, Wisconsin . References ↑ "Broadwind Energy (Formerly Tower Tech Holdings)" Retrieved from "http://en.openei.org/w/index.php?title=Broadwind_Energy_Formerly_Tower_Tech_Holdings&oldid=343059"

93

Wind Turbine Towers Establish New Height Standards and Reduce...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind Turbine Towers Establish New Height Standards and Reduce Cost of Wind Energy Wind Turbine Towers Establish New Height Standards and Reduce Cost of Wind Energy Case study that...

94

BOREAS SSA-YJP Tower Flux Data Revised  

NLE Websites -- All DOE Office Websites (Extended Search)

Tower Flux Data Revised A revised version of the BOREAS TF04 tower flux data is now available from the ORNL DAAC. Data providers have revised the data set entitled "BOREAS TF-04...

95

Optimal sequencing of a cooling tower with multiple cells  

E-Print Network (OSTI)

This paper evaluates the energy savings potential of multi-cell cooling tower optimal sequencing control methods. Annual tower fan energy usage is calculated for a counter-flow tower with multiple variable-speed fans. Effectiveness-NTU tower model is employed to predict the cooling tower performance at various conditions. Natural convection when the fan is off is accounted by using an assumed airflow rate. The energy savings at five cities representing different typical climates are studied using typical meteorological year data. The results show that, if the tower capacity can be increased by 50% and 100% by running extra tower cells, the annual total fan power usage can be reduced by 44% and 61%, respectively. A cumulative saving percent curve is generated to help estimate the annual total savings percent when extra cooling tower capacity is available during only part of a year.

Zhang, Z.; Liu, J.

2012-01-01T23:59:59.000Z

96

Great Plaines installs directionally drilled crossings in Texas  

SciTech Connect

This paper reports on installing a five- line wide, one-line long products system for ARCO Pipe Line Co. (APLC) in a crowded utility right of way required Great Plains Pipeline Construction Co. to complete three directionally drilled crossings and over 50 conventional bored crossings in the Channelview, Texas area. The pipe line route closely parallels a 4-mi ROW section of Houston Power and Light Co. (HP and L) and about 4 mi of Union Pacific Railroad tracks. Due to overhead towers carrying high-voltage electric transmission lines, Great Plains bored under the existing towers in HP and L's easement to preserve the right of way for future tower expansion. Laney, Inc., subcontracted the conventional bores underneath towers and minor roads. Laney Directional Drilling Co. was the prime contractor for two horizontal directionally drilled crossings of the Houston Ship Channel and Carpenter's Bayou. Great Plains, with its own crew, completed three roadway crossings in high-traffic areas. Engineering and material procurement was handled by APLC.

Thiede, K.L.

1991-09-01T23:59:59.000Z

97

Cooling Towers, The Neglected Energy Resource  

E-Print Network (OSTI)

Loving care is paid to the compressors, condensers, and computer programs of refrigeration systems. When problems arise, operator: run around in circles with expensive "fixes", but historically ignore the poor orphan, the cooling tower perched on the roof or located somewhere in the backyard. When the cooling water is too hot, high temperature cut-outs occur and more energy must be provided to the motors to maintain the refrigeration cycle. Cooling Towers: 1) . . . are just as important a link in the chain as the other equipment, 2) ... are an important source of energy conservation, 3) ... can be big money makers, and 4 ) .. . operators should be aware of the potential of maximizing cold water. Most towers designed over 20 years ago were inefficiently engineered due to cheap power and the "low bidder" syndrome. Operating energy costs were ignored and purchasing criteria was to award the contract to the lowest bidder. This paper investigates internal elements of typical towers, delineates their functions and shows how to upgrade them in the real world for energy savings and profitability of operation.

Burger, R.

1985-01-01T23:59:59.000Z

98

Cooling Towers, The Neglected Energy Resource  

E-Print Network (OSTI)

Loving care is paid to the compressors, condensers, and computer programs of refrigeration and air conditioning systems. When problems arise, operators and engineers run around in circles with expensive "fixes" , but historically ignore the poor orphan of the system, the cooling tower perched on the roof or located somewhere in the backyard. When cooling water is too hot, high temperature cut-outs occur and more energy must be provided to the motors to maintain the refrigeration cycle. Cooling towers: 1) are just as important a link in the chain as the other equipment; 2) are an important source of energy conservation; 3) can be big money makers; 4) operators should be aware of the potential of maximising cold water. Most towers were designed over 20 years ago and were inefficiently engineered due to cheap power and the "low bidder gets the sale" syndrome. Operating energy costs were ignored and purchasing criteria was to award the contract to the lowest bidder. All too often the low bidder - even though some of the most respected firms were involved - cut thermal corners for the sale. This paper investigates the internal elements of the typical types of cooling towers currently used, delineates their functions and shows how to upgrade them in the real world for energy savings and profitability of operation. Hard before and after statistics of costs and profits obtained through optimization of colder water by engineered thermal upgrading will be discussed. Salient points will be reenforced with on-the-job, hands-on, slides and illustrations.

Burger, R.

1987-09-01T23:59:59.000Z

99

Untapped Energy Savings from Cooling Towers  

E-Print Network (OSTI)

A cooling tower is often an overlooked source of easy energy savings. As long as it's running not much thought is usually given to it, but when numbers are applied to how much a degree of colder water is worth it can become a valuable and ready source of energy and monetary savings. Many of these savings can come from simple maintenance or by changing the way the tower is operated. The more dramatic savings can come from changing to advanced fill concepts. Over our 40 years of working in the cooling tower industry we have measured the effects of doing simple maintenance, the effects of blocking air flow with seemingly good ideas like maintenance walkways, the effects of nearby heat sources, and what fill changes are likely to get. We have put numbers to what a degree is worth to a large petrochemical company so you can get an idea of the magnitude of what these sometimes simple changes are actually worth. Also, we've included a way to monitor your tower for changes in performance.

Phelps Jr., P.

2011-01-01T23:59:59.000Z

100

Wastewater Reuse as Cooling-Tower Makeup  

Science Conference Proceedings (OSTI)

As many parts of the United States begin to face shortages, utilities will look for reliable new water sources. Focusing on the use of wastewater as makeup to cooling towers, this report describes commercially available wastewater treatments for power plant applications and highlights the need for research to control biologic slime and phosphate scale formation.

1987-09-02T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

PERFORMANCE ANALYSIS OF MECHANICAL DRAFT COOLING TOWER  

SciTech Connect

Industrial processes use mechanical draft cooling towers (MDCT's) to dissipate waste heat by transferring heat from water to air via evaporative cooling, which causes air humidification. The Savannah River Site (SRS) has cross-flow and counter-current MDCT's consisting of four independent compartments called cells. Each cell has its own fan to help maximize heat transfer between ambient air and circulated water. The primary objective of the work is to simulate the cooling tower performance for the counter-current cooling tower and to conduct a parametric study under different fan speeds and ambient air conditions. The Savannah River National Laboratory (SRNL) developed a computational fluid dynamics (CFD) model and performed the benchmarking analysis against the integral measurement results to accomplish the objective. The model uses three-dimensional steady-state momentum, continuity equations, air-vapor species balance equation, and two-equation turbulence as the basic governing equations. It was assumed that vapor phase is always transported by the continuous air phase with no slip velocity. In this case, water droplet component was considered as discrete phase for the interfacial heat and mass transfer via Lagrangian approach. Thus, the air-vapor mixture model with discrete water droplet phase is used for the analysis. A series of parametric calculations was performed to investigate the impact of wind speeds and ambient conditions on the thermal performance of the cooling tower when fans were operating and when they were turned off. The model was also benchmarked against the literature data and the SRS integral test results for key parameters such as air temperature and humidity at the tower exit and water temperature for given ambient conditions. Detailed results will be published here.

Lee, S; Alfred Garrett, A; James02 Bollinger, J; Larry Koffman, L

2009-02-10T23:59:59.000Z

102

Wind Turbine Towers Establish New Height Standards and Reduce Cost of Wind Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind Tower Systems to develop the Wind Tower Systems to develop the Space Frame tower, a new concept for wind turbine towers. Instead of a solid steel tube, the Space Frame tower consists of a highly optimized design of five custom-shaped legs and interlaced steel struts. With this design, Space Frame towers can support turbines at greater heights, yet weigh and cost less than traditional steel tube towers. Wind Tower Systems LLC (now

103

Milling Machine Replacement Project (4587), 5/11/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Milling Machine Replacement Projects (4587) Milling Machine Replacement Projects (4587) Program or Field Office: Y-12 Site Office Location(s) (City/County/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: Submit by E-mail The proposed action is to replace two large milling machines with two new medium sized CNC milling machines. The new machines will be connected to the digital network communication (DNC) system. Categorical Exclusion(s) Applied: 81.31 -Installation or relocation of machinery and equipment For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation)

104

HVAC Installed Performance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC Installed Performance HVAC Installed Performance ESI, Tim Hanes Context * The building envelope has historically been the focus in residential homes. * The largest consumer of energy in residential homes is typically the HVAC system. * Testing the performance of the HVAC system has not been pursued to its full potential. Technical Approach * Currently very little performance testing is being done to the HVAC system. * The only way to know if a HVAC system is operating correctly is to measure the Btu/h. * This should be done at the equipment and at the the system. Recommended Guidance * Training of HVAC technicians, installers, and salespeople is a must. * If only the technician is trained than implementing the change will not happen. * Public awareness of proper installation and its

105

HVAC Installed Performance  

Energy.gov (U.S. Department of Energy (DOE))

This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question ŤHVAC proper installation energy savings: over-promising or under-delivering?"

106

Surface and Tower Meteorological Instrumentation at NSA Handbook - January 2006  

SciTech Connect

The Surface and Tower Meteorological Instrumentation at Atqasuk (METTWR2H) uses mainly conventional in situ sensors to measure wind speed, wind direction, air temperature, dew point and humidity mounted on a 10-m tower. It also obtains barometric pressure, visibility, and precipitation data from sensors at or near the base of the tower. In addition, a Chilled Mirror Hygrometer is located at 1 m for comparison purposes. Temperature and relative humidity probes are mounted at 2 m and 5 m on the tower. For more information, see the Surface and Tower Meteorological Instrumentation at Atqasuk Handbook.

MT Ritsche

2006-01-30T23:59:59.000Z

107

Concentrating Solar Power Tower System Basics | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Concentrating Solar Power Tower System Basics Concentrating Solar Power Tower System Basics Concentrating Solar Power Tower System Basics August 20, 2013 - 5:06pm Addthis In power tower concentrating solar power systems, numerous large, flat, sun-tracking mirrors, known as heliostats, focus sunlight onto a receiver at the top of a tall tower. A heat-transfer fluid heated in the receiver is used to generate steam, which, in turn, is used in a conventional turbine generator to produce electricity. Some power towers use water/steam as the heat-transfer fluid. Other advanced designs are experimenting with molten nitrate salt because of its superior heat-transfer and energy-storage capabilities. Individual commercial plants can be sized to produce up to 200 megawatts of electricity. Illustration of a power tower power plant. Sunlight is shown reflecting off a series of heliostats surrounding the tower and onto the receiver at the top of the tower. The hot heat-transfer fluid exiting from the receiver flows down the tower, into a feedwater reheater, and then into a turbine, which generates electricity that is fed into the power grid. The cool heat-transfer fluid exiting the turbine flows into a steam condenser to be cooled and sent back up the tower to the receiver.

108

"Invisible" Archaeological Deposits at Small Milling Sites  

E-Print Network (OSTI)

Deposits at Small Milling Sites ROBERT E. PARR and MARK Q.architechire, bedrock milling features, soil colorlithic scatters or bedrock milling stations), it appears

Parr, Robert E.; Sutton, Mark Q.

1991-01-01T23:59:59.000Z

109

SunShot Initiative: Brayton Cycle Baseload Power Tower  

NLE Websites -- All DOE Office Websites (Extended Search)

Brayton Cycle Baseload Power Brayton Cycle Baseload Power Tower to someone by E-mail Share SunShot Initiative: Brayton Cycle Baseload Power Tower on Facebook Tweet about SunShot Initiative: Brayton Cycle Baseload Power Tower on Twitter Bookmark SunShot Initiative: Brayton Cycle Baseload Power Tower on Google Bookmark SunShot Initiative: Brayton Cycle Baseload Power Tower on Delicious Rank SunShot Initiative: Brayton Cycle Baseload Power Tower on Digg Find More places to share SunShot Initiative: Brayton Cycle Baseload Power Tower on AddThis.com... Concentrating Solar Power Systems Components Competitive Awards CSP Research & Development Thermal Storage CSP Recovery Act Baseload CSP SunShot Multidisciplinary University Research Initiative CSP Heat Integration for Baseload Renewable Energy Deployment

110

Side Stream Filtration for Cooling Towers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Side Stream Filtration Side Stream Filtration for Cooling Towers Prepared for the U.S. Department of Energy Federal Energy Management Program By Pacific Northwest National Laboratory X. Duan, J.L. Williamson, K.L McMordie Stoughton and B.K. Boyd October 2012 FEDERAL ENERGY MANAGEMENT PROGRAM i Contact Will Lintner, PE Federal Energy Management Program U.S. Department of Energy 1000 Independence Ave. SW Washington, DC 20585-0121 Phone: (202) 586-3120 E-mail: william.lintner@ee.doe.gov Cover photo: Cooling Towers. Photo from Pacific Northwest National Laboratory ii Acknowledgements The authors of the report would like to thank the following individuals that provided support to

111

Wet/dry cooling tower and method  

DOE Patents (OSTI)

A wet/dry cooling tower wherein a liquid to-be-cooled is flowed along channels of a corrugated open surface or the like, which surface is swept by cooling air. The amount of the surface covered by the liquid is kept small compared to the dry part thereof so that said dry part acts as a fin for the wet part for heat dissipation.

Glicksman, Leon R. (Lynnfield, MA); Rohsenow, Warren R. (Waban, MA)

1981-01-01T23:59:59.000Z

112

Update: Cooling tower and spray pond technology  

SciTech Connect

The 9th Cooling Tower and Spray Pond Symposium, under the auspices of the International Association for Hydraulic Research, took place at the von Karman Institute for Fluid Dynamics, Belgium, in September 1994. Technical topics discussed included cooling system design, performance, operation, environmental effects, modeling and components. Symposium proceedings will not be published. However, information of primary interest to staffs of power plants in the United States is summarized in this article.

Bartz, J.A.

1995-05-01T23:59:59.000Z

113

Predict particle collection in spray towers  

SciTech Connect

Spray tower wet scrubbers are used for control of particulates (as well as gaseous pollutants). The author has found that in cocurrent spray scrubbers, the most important parameter in determining particle collection efficiency is inlet dust particle size, followed by (in decreasing order of importance) gas velocity, collector droplet size, liquid-to-gas ratio, and length of scrubber. In countercurrent scrubbers, the most important parameters are collector droplet size, liquid-to-gas ratio, length of scrubber, and gas velocity. Note that some of these factors are directly related to collection, and some are related indirectly. This article provides equations, based on theoretical considerations and empirical data, for predicting particle collection efficiencies. The parameter ranges covered are typical of those encountered in the practical operation of conventional spray towers that use a ``cool`` (or cooled) inlet gas stream, so the equations are applicable to many industrial spray tower systems. The results are limited based on the ranges of the parameters evaluated, and while it may be possible to extrapolate beyond that, this has not been verified. (The initial model was for a flue-gas desulfurization system at a large power station that requires both particulate removal and SO{sub 2} absorption.)

Hesketh, H.E. [Southern Illinois Univ., Carbondale, IL (United States)

1995-10-01T23:59:59.000Z

114

Yang-Mills redux  

E-Print Network (OSTI)

It is noted that a given pairing of the phase factor and gauge transformation to retain gauge symmetry is not unique. In their seminal paper, when Yang and Mills (YM) discuss the phase factor- gauge transformation relationship, they cite Pauli’s review paper. It is interesting that although Pauli in that paper presents the electromagnetic field strength in terms of a commutator, for whatever reason YM did not extrapolate the commutator’s use to obtain the Yang-Mills field strength – they obtained it by trial and error. Presented is a derivation of this field strength using the commutator approach detailing how certain terms cancel each other. Finally, the Yang-Mills field transformation is derived in a slightly different way than is traditionally done. 1

Samuel L. Marateck

2006-01-01T23:59:59.000Z

115

RAFFINATE CHARACTERIZATION PION RIDGE MILL  

E-Print Network (OSTI)

were: I. The Uranium Fuel Cycle Facilities 2. Underground Uranium Mines 3. Inactive Uranium Mill Tailings 4. Licensed Uranium Mill Tailings 5. High-Level Waste Disposal Facilities 6. Department of Energy-2 ...........................................1.2.2 Uranium Mills 1-2 ...............................1.2.3 Uranium Conversion Facilities 1

116

Mills, Dams, and Reservoirs (Massachusetts) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Mills, Dams, and Reservoirs (Massachusetts) Mills, Dams, and Reservoirs (Massachusetts) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State Massachusetts Program Type Siting and Permitting Provider Department of Conservation and Recreation This chapter of the Massachusetts General Laws outlines procedures to

117

Oak Ridge's EM Program Demolishes North America's Tallest Water Tower |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Demolishes North America's Tallest Water Demolishes North America's Tallest Water Tower Oak Ridge's EM Program Demolishes North America's Tallest Water Tower August 27, 2013 - 12:00pm Addthis Oak Ridge’s K-1206 F Fire Water Tower falls into an empty field during a recent demolition project. Oak Ridge's K-1206 F Fire Water Tower falls into an empty field during a recent demolition project. OAK RIDGE, Tenn. - Oak Ridge's EM program recently demolished one of the most iconic structures at the East Tennessee Technology Park (ETTP). The 382-foot checkerboard water tower - the tallest in North America - dominated the site's skyline since its construction in 1958. The K-1206 F Fire Water Tower operated as part of the site's fire protection system, but it was drained, disconnected and permanently taken

118

A Microcomputer Model of Crossflow Cooling Tower Performance  

E-Print Network (OSTI)

The energy use characteristics of evaporative cooling towers are of interest because, although such towers are widely used in industry, they do require a substantial amount of energy. Evaporative cooling towers are basically large heat exchangers that use both sensible heat transfer and mass transfer to cool. The heat and mass transfer process for a crossflow cooling tower has been modeled on an Apple II microcomputer. Various heat loads or weather conditions can be imposed on a given tower to evaluate its response; moreover, a subprogram can evaluate pressure drop and motor/fan characteristics. Determination of the energy required to operate the tower enables its performance to be compared against energy-saving operations such as variable speed drive or changes in fill height or type.

Reichelt, G. E; Jones, J. W.

1984-01-01T23:59:59.000Z

119

A virtual tall tower network for understanding continental sources and sinks of CO2  

SciTech Connect

Our understanding of the North American terrestrial carbon cycle is limited by both a lack of continental atmospheric CO2 data, and by a need for methods to interpret these and other continental data with confidence. In response to this challenge a rapid expansion of the N. American carbon cycle observational network is underway. This expansion includes a network of continuous, continental CO2 mixing ratio observations being collected at a subset of AmeriFlux towers. Progress in developing this resource includes instrument development, site installation, calibration and intercalibration efforts, and initiation of a uniform data product. Progess in applying these data include proposed methods for interpreting surface layer measurements in atmospheric inversions (the virtual tall towers approach), examination of coherence patterns in continental mixing ratios in response to weather and climate, and application of these mixing ratio measurements in formal atmospheric inversions. Future work will merge these methods with interpretation of flux towers observations of terrestrial carbon fluxes in an effort to create a single coherent diagnosis of North American terrestrial carbon fluxes over a multi-year period.

Davis, K.J.; Richardson, S.J.; Miles, N.L.

2007-03-09T23:59:59.000Z

120

Stability and Turbulence in the Atmospheric Boundary Layer: A Comparison of Remote Sensing and Tower Observations  

Science Conference Proceedings (OSTI)

When monitoring winds and atmospheric stability for wind energy applications, remote sensing instruments present some advantages to in-situ instrumentation such as larger vertical extent, in some cases easy installation and maintenance, measurements of vertical humidity profiles throughout the boundary layer, and no restrictions on prevailing wind directions. In this study, we compare remote sensing devices, Windcube lidar and microwave radiometer, to meteorological in-situ tower measurements to demonstrate the accuracy of these measurements and to assess the utility of the remote sensing instruments in overcoming tower limitations. We compare temperature and wind observations, as well as calculations of Brunt-Vaisala frequency and Richardson numbers for the instrument deployment period in May-June 2011 at the U.S. Department of Energy National Renewable Energy Laboratory's National Wind Technology Center near Boulder, Colorado. The study reveals that a lidar and radiometer measure wind and temperature with the same accuracy as tower instruments, while also providing advantages for monitoring stability and turbulence. We demonstrate that the atmospheric stability is determined more accurately when the liquid-water mixing ratio derived from the vertical humidity profile is considered under moist-adiabatic conditions.

Friedrich, K.; Lundquist, J. K.; Aitken, M.; Kalina, E. A.; Marshall, R. F.

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Electricity generation potential of Thai sugar mills  

SciTech Connect

At present, the total installed electricity generating capacity of Thailand is 7500 MW. Because this level of investment will take an unacceptable large part of total foreign borrowing, the government plans to encourage participation of the private sector in electricity generation. Among the various technology options for power production, cogeneration appears to be the most promising technology due to its very high effectiveness of fuel utilization. Therefore, in the first phase of private power generation, the Thai government is encouraging cogeneration systems. This paper discusses sugar mills, where expertise and equipment for electricity generation already exist, appear to be in a particularly advantageous position to participate in the private power generation program. At present, there are 46 sugar mills in Thailand with a total capacity of 338,000 tons of cane per day. The fiber part delivered from the milling of sugarcane, bagasse, is normally used to produce steam for the process heat and electricity generation. The investment and operating costs for each of these alternatives have been evaluated. The internal rate of return is used to indicate the benefit of each alternative.

Therdyothin, A.; Bhattacharaya, S.C.; Chirarattananon, S. (Asian Inst. of Tech., Bangkok (Thailand))

1992-10-01T23:59:59.000Z

122

Vortex-augmented cooling tower-windmill combination  

DOE Patents (OSTI)

A cooling tower for cooling large quantities of effluent water from a production facility by utilizing natural wind forces includes the use of a series of helically directed air inlet passages extending outwardly from the base of the tower to introduce air from any direction in a swirling vortical pattern while the force of the draft created in the tower makes it possible to place conventional power generating windmills in the air passages to provide power as a by-product.

McAllister, Jr., John E. (Aiken, SC)

1985-01-01T23:59:59.000Z

123

Competitive Landscape of Mobile Telecommunications Tower Companies in India  

Science Conference Proceedings (OSTI)

With the entry of 3G and WiMAX players, the Indian mobile subscriber base is expected to reach 1110 million by the end of 2015. To meet mobile infrastructure demand, India will require approximately 350,000 to 400,000 mobile telecommunications towers ... Keywords: Business Models, Infrastructure Sharing, Joint Venture Companies, Mobile Network Operators MNO, Mobile Telecommunication Tower Valuation, Mobile Telecommunications Towers, Telecommunication Circles

N.P. Singh

2010-01-01T23:59:59.000Z

124

Solar power tower development: Recent experiences  

DOE Green Energy (OSTI)

Recent experiences with the 10 MW{sub e} Solar Two and the 2.5 MW{sub t} TSA (Technology Program Solar Air Receiver) demonstration plants are reported. The heat transfer fluids used in these solar power towers are molten-nitrate salt and atmospheric air, respectively. Lessons learned and suggested technology improvements for next-generation plants are categorized according to subsystem. The next steps to be taken in the commercialization process for each these new power plant technologies is also presented.

Tyner, C.; Kolb, G.; Prairie, M. [and others

1996-12-01T23:59:59.000Z

125

H-FACET: Alignment Tool for Power Tower Heliostats  

H-FACET: Alignment Tool for Power Tower Heliostats ... for the U.S. Department of Energy’s National Nuclear Security Administration. SAND # 2011-4640P

126

California Code of Regulations, Title 8, Section 1646. Tower...  

NLE Websites -- All DOE Office Websites (Extended Search)

Subchapter 4. Construction Safety Orders Article 22. Scaffolds--Various Types New query 1646. Tower Scaffolds and Rolling Scaffolds, Wood or Metal. (a) The minimum...

127

Comparative evaluation of cooling tower drift eliminator performance  

E-Print Network (OSTI)

The performance of standard industrial evaporative cooling tower drift eliminators is analyzed using experiments and numerical simulations. The experiments measure the

Chan, Joseph Kwok-Kwong

128

The Damaging Effects of Earthquake Excitation on Concrete Cooling Towers  

SciTech Connect

Reinforced concrete cooling towers of hyperbolic shell configuration find widespread application in utilities engaged in the production of electric power. In design of critical civil infrastructure of this type, it is imperative to consider all the possible loading conditions that the cooling tower may experience, an important loading condition in many countries is that of the earthquake excitation, whose influence on the integrity and stability of cooling towers is profound. Previous researches have shown that the columns supporting a cooling tower are sensitive to earthquake forces, as they are heavily loaded elements that do not possess high ductility, and understanding the behavior of columns under earthquake excitation is vital in structural design because they provide the load path for the self weight of the tower shell. This paper presents the results of a finite element investigation of a representative 'dry' cooling tower, using realistic horizontal and vertical acceleration data obtained from the recent and widely-reported Tabas, Naghan and Bam earthquakes in Iran. The results of both linear and nonlinear analyses are reported in the paper, the locations of plastic hinges within the supporting columns are identified and the ramifications of the plastic hinges on the stability of the cooling tower are assessed. It is concluded that for the (typical) cooling tower configuration analyzed, the columns that are instrumental in providing a load path are influenced greatly by earthquake loading, and for the earthquake data used in this study the representative cooling tower would be rendered unstable and would collapse under the earthquake forces considered.

Abedi-Nik, Farhad [SADRA Institute of Higher Education, Tehran (Iran, Islamic Republic of); Sabouri-Ghomi, Saeid [K.N.T University of Technology, Tehran (Iran, Islamic Republic of)

2008-07-08T23:59:59.000Z

129

Application of upspray type water distribution systems in cooling towers  

SciTech Connect

The efficient and uniform distribution of the warm circulating water on to the filling of cooling towers has been the continuing goal of the tower designer. The final element in the water distribution system, the sprayer, plays an important role in achieving this objective. This paper discusses the performance and operational characteristics of a sprayer utilized in counterflow towers that directs the water leaving the sprayer nozzle in an upward direction and briefly compares its performance with that of downward sprayers. The discussion also covers relative tower economics and application data of the sprayer.

Fay, H.P.; Hesse, G.

1985-01-01T23:59:59.000Z

130

Spray tower: the workhorse of flue-gas desulfurization  

Science Conference Proceedings (OSTI)

A recently developed spray tower system for use in a utility flue gas desulfurization system is simple, durable, and capable of achieving very high sulfur dioxide removal efficiencies, possibly approaching 100%. The principles behind the design and operation of the spray tower are discussed. The quality of water used for washing, tower size limitations, construction materials liquid distribution, gas-inlet design, gas distribution, mass transfer, and operating characteristics are examined. Procedures to maintain the reliability and high performance of the spray tower are described. (5 diagrams, 5 photos, 12 references, 1 table)

Saleem, A.

1980-10-01T23:59:59.000Z

131

Lattice Tower Design of Offshore Wind Turbine Support Structures.  

E-Print Network (OSTI)

??Optimal design of support structure including foundation and turbine tower is among the most critical challenges for offshore wind turbine. With development of offshore wind… (more)

Gong, W.

2011-01-01T23:59:59.000Z

132

THE STEEL TOWER: A 21st CENTURY TALL BUILDING.  

E-Print Network (OSTI)

?? This paper outlines the need for a new mixed use high-rise project for the commercial business district of Pittsburgh, Pennsylvania. The proposed tower combines… (more)

Duke, Peter Guldenshuh

2013-01-01T23:59:59.000Z

133

Out of Ashes and Rubble: The Pirelli Tower  

E-Print Network (OSTI)

tower was novel, experimental architecture because it was the first skyscraper to be built in Italy; it was an extremely tall

Ziegler, Claudia J.

2009-01-01T23:59:59.000Z

134

Performance evaluation of natural draught cooling towers with anisotropic fills.  

E-Print Network (OSTI)

??ENGLISH ABSTRACT: In the design of a modern natural draught wet-cooling tower (NDWCT), structural and performance characteristics must be considered. Air flow distortions and resistances… (more)

Reuter, Hanno Carl Rudolf

2010-01-01T23:59:59.000Z

135

Evaluation and performance prediction of cooling tower spray zones.  

E-Print Network (OSTI)

??Cooling tower spray nozzle performance characteristics such as the water distribution onto the fill material, air side pressure drop, pump head, drop size distribution and… (more)

Viljoen, D. J.

2006-01-01T23:59:59.000Z

136

Evaluation and performance prediction of cooling tower rain zones.  

E-Print Network (OSTI)

??Cooling tower rain zone performance characteristics such as the loss coefficient and the Merkel number are evaluated and simulated. To this end the influence of… (more)

Pierce, Darren John

2007-01-01T23:59:59.000Z

137

Evaluation of End Mill Coatings  

SciTech Connect

Milling tests were run on families of High Speed Steel (HSS) end mills to determine their lives while machining 304 Stainless Steel. The end mills tested were made from M7, M42 and T15-CPM High Speed Steels. The end mills were also evaluated with no coatings as well as with Titanium Nitride (TiN) and Titanium Carbo-Nitride (TiCN) coatings to determine which combination of HSS and coating provided the highest increase in end mill life while increasing the cost of the tool the least. We found end mill made from M42 gave us the largest increase in tool life with the least increase in cost. The results of this study will be used by Cutting Tool Engineering in determining which end mill descriptions will be dropped from our tool catalog.

L. J. Lazarus; R. L. Hester,

2005-08-01T23:59:59.000Z

138

Curating performance installations  

Science Conference Proceedings (OSTI)

In this paper we will examine the use of the digital screen display as a primary form of accessing information within the museum context. We will argue that this mode of dissemination, achieved primarily through a Graphic User Interface (GUI) though ... Keywords: GUI, becoming, being, content, dissemination, exhibition, experience, form, information, installation, interactivity, interpretation, materiality, museum, nothing, objecthood, performance, performative, re-enactment, screen, technology, trajectory

Daniel Felstead; Kate Bailey

2011-07-01T23:59:59.000Z

139

The cyclic multi-peg Tower of Hanoi  

Science Conference Proceedings (OSTI)

Variants of the classical Tower of Hanoi problem evolved in various directions. Allowing more than 3 pegs, and imposing limitations on the possible moves among the pegs, are two of these. Here, we deal with the case of h?3 pegs arranged on ... Keywords: Multi-peg tower of Hanoi

Daniel Berend; Amir Sapir

2006-07-01T23:59:59.000Z

140

2009 EPRI Cooling Tower Technology Seminar and Symposium  

Science Conference Proceedings (OSTI)

Cooling towers and associated systems cause significant loss of availability and heat rate degradation in both nuclear and fossil-fired power plants. Twenty-five papers presented at a 2009 conference in Cincinnati, Ohio discussed industrial experience and provided case histories of cooling tower problems and solutions.

2009-10-05T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Modification of the Colony Tower for the RIO BLANCO detonation  

SciTech Connect

The tower is a 180-ft tall steel-frame experimental oil shale processing retort structure with heavy process equipment on various levels. The structural response of the tower to the ground motion from Project Rio Blanco is analyzed and the necessary structural modifications described. (TFD)

Blume, J.A.; Lee, L.A.; Freeman, S.A.; Honda, K.K.

1974-04-30T23:59:59.000Z

142

Refrigerant Phase-Change Stirling-Cycle Solar Power Towers  

Science Conference Proceedings (OSTI)

This paper firstly introduces the principles of Refrigerant Phase-Change Stirling-Cycle solar power towers This heat engines use solar reservoire. When the refrigerant in an engine cylinder absorbs heat from high-temperature heat sources, refrigerant ... Keywords: refrigerant phase-change cycle, heat engines, solar power tower, finite-time thermodynamics

Dezhong Huang

2011-01-01T23:59:59.000Z

143

Experiment Study on Tower Cooling Energy-Saving Technology  

Science Conference Proceedings (OSTI)

During the transition season periods the technology of tower cooling is used to cool the internal heat source region in the buildings, which is energy saving and environment friendly technology. To aim at climatic conditions of the transition season ... Keywords: towers cooling, experiments, fluence factors, energy saving

Ji Amin; He Li; Yue Zhiqiang; Jie Li; Gang Yin; Zhang Qinggang

2011-02-01T23:59:59.000Z

144

Best Practices for Energy Efficient Cleanrooms: Cooling Tower and Condenser Water Optimization  

E-Print Network (OSTI)

LBNL-58634 Best Practices for Energy Efficient Cleanrooms: Cooling Tower and Condenser Water Efficient Cleanrooms: Cooling tower and condenser water optimization Tengfang Xu Contents HVAC WATER SYSTEMS.............................................................................................. 2 Cooling tower and condenser water optimization

145

Low pressure turbine installation  

SciTech Connect

Low-pressure turbine installation is described comprising a casing, at least two groups of turbine stages mounted in said casing, each turbine stage having blades so arranged that a flow of steam passes through the respective turbine stages in contraflow manner, partition means in said casing for separating the opposed final stages of said turbine stages from each other, and steam exhausting means opened in the side walls of said casing in a direction substantially perpendicular to the axis of said turbine, said steam exhausting means being connected to condensers.

Iizuka, N.; Hisano, K.; Ninomiya, S.; Otawara, Y.

1976-08-10T23:59:59.000Z

146

Hydrogen Storage in Wind Turbine Towers: Design Considerations; Preprint  

DOE Green Energy (OSTI)

The paramount considerations associated with a hydrogen tower are corrosion (in the form of hydrogen embrittlement) and structural failure (through bursting or fatigue life degradation). Although hydrogen embrittlement (HE) requires more research and experimentation, it does not appear to prohibit the use of turbine towers for hydrogen storage. Furthermore, the structural modifications required to store hydrogen in a tower are technically feasible. We discovered that hydrogen towers have a''crossover pressure'' at which their critical mode of failure crosses over from fatigue to bursting. The crossover pressure for many turbine towers is between 10 and 15 atm. The cost of hydrogen storage per unit of storage capacity is lowest near the crossover pressure. Above the crossover pressure, however, storage costs rise quickly.

Kottenstette, R.; Cotrell, J.

2003-09-01T23:59:59.000Z

147

Conversion Tower for Dispatchable Solar Power: High-Efficiency Solar-Electric Conversion Power Tower  

Science Conference Proceedings (OSTI)

HEATS Project: Abengoa Solar is developing a high-efficiency solar-electric conversion tower to enable low-cost, fully dispatchable solar energy generation. Abengoa’s conversion tower utilizes new system architecture and a two-phase thermal energy storage media with an efficient supercritical carbon dioxide (CO2) power cycle. The company is using a high-temperature heat-transfer fluid with a phase change in between its hot and cold operating temperature. The fluid serves as a heat storage material and is cheaper and more efficient than conventional heat-storage materials, like molten salt. It also allows the use of a high heat flux solar receiver, advanced high thermal energy density storage, and more efficient power cycles.

None

2012-01-11T23:59:59.000Z

148

Tower reactors for bioconversion of lignocellulosic material  

DOE Patents (OSTI)

An apparatus for enzymatic hydrolysis and fermentation of pretreated lignocellulosic material, in the form of a tower bioreactor, having mixers to achieve intermittent mixing of the material. Precise mixing of the material is important for effective heat and mass transfer requirements without damaging or denaturing the enzymes or fermenting microorganisms. The pretreated material, generally in the form of a slurry, is pumped through the bioreactor, either upwards of downwards, and is mixed periodically as it passes through the mixing zones where the mixers are located. For a thin slurry, alternate mixing can be achieved by a pumping loop which also serves as a heat transfer device. Additional heat transfer takes place through the reactor heat transfer jackets.

Nguyen, Quang A. (16458 W. 1st Ave., Golden, CO 80401)

1998-01-01T23:59:59.000Z

149

Tower reactors for bioconversion of lignocellulosic material  

DOE Patents (OSTI)

An apparatus for enzymatic hydrolysis and fermentation of pretreated lignocellulosic material, in the form of a tower bioreactor, having mixers to achieve intermittent mixing of the material. Precise mixing of the material is important for effective heat and mass transfer requirements without damaging or denaturing the enzymes or fermenting microorganisms. The pretreated material, generally in the form of a slurry, is pumped through the bioreactor, either upwards or downwards, and is mixed periodically as it passes through the mixing zones where the mixers are located. For a thin slurry, alternate mixing can be achieved by a pumping loop which also serves as a heat transfer device. Additional heat transfer takes place through the reactor heat transfer jackets.

Nguyen, Quang A. (16458 W. 1st Ave., Golden, CO 80401)

1999-01-01T23:59:59.000Z

150

Tower reactors for bioconversion of lignocellulosic material  

DOE Patents (OSTI)

An apparatus is described for enzymatic hydrolysis and fermentation of pretreated lignocellulosic material, in the form of a tower bioreactor, having mixers to achieve intermittent mixing of the material. Precise mixing of the material is important for effective heat and mass transfer requirements without damaging or denaturing the enzymes or fermenting microorganisms. The pretreated material, generally in the form of a slurry, is pumped through the bioreactor, either upwards or downwards, and is mixed periodically as it passes through the mixing zones where the mixers are located. For a thin slurry, alternate mixing can be achieved by a pumping loop which also serves as a heat transfer device. Additional heat transfer takes place through the reactor heat transfer jackets. 5 figs.

Nguyen, Q.A.

1999-03-30T23:59:59.000Z

151

Tower reactors for bioconversion of lignocellulosic material  

DOE Patents (OSTI)

An apparatus is disclosed for enzymatic hydrolysis and fermentation of pretreated lignocellulosic material. The apparatus consists of a tower bioreactor which has mixers to achieve intermittent mixing of the material. Precise mixing of the material is important for effective heat and mass transfer requirements without damaging or denaturing the enzymes or fermenting microorganisms. The pretreated material, generally in the form of a slurry, is pumped through the bioreactor, either upwards or downwards, and is mixed periodically as it passes through the mixing zones where the mixers are located. For a thin slurry, alternate mixing can be achieved by a pumping loop which also serves as a heat transfer device. Additional heat transfer takes place through the reactor heat transfer jackets. 5 figs.

Nguyen, Q.A.

1998-03-31T23:59:59.000Z

152

Cooling Towers: Understanding Key Components of Cooling Towers and How to Improve Water Efficiency  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Paul Johnston-Knight Introduction Federal laws and regulations require Federal agencies to reduce water use and improve water efficiency. Namely, Executive Order 13514 Federal Leadership in Environmental, Energy, and Economic Performance, requires an annual two percent reduction of water use intensity (water use per square foot of building space) for agency potable water consumption as well as a two percent reduction of water use for industrial, landscaping, and agricultural applica- tions. Cooling towers can be a significant

153

Cooling Towers--Energy Conservation Strategies Preservative Spray Treatment Maintains Cooling Tower  

E-Print Network (OSTI)

Several problems common to most industrial wood framed cooling towers can be easily controlled with annual preservative spray treatment applications to the plenum area framework and drift eliminators. It eliminates the expensive periodic repairs due to wood decay which sooner or later will occur without preservative protection. Preventing or minimizing the destructive effect of internal wood decay of the framework also avoids unexpected down time due to emergency maintenance or unexpected collapse of the main supporting framework.

Reidenback, R.

1991-06-01T23:59:59.000Z

154

Property:CoolingTowerWaterUseWinterConsumed | Open Energy Information  

Open Energy Info (EERE)

search Property Name CoolingTowerWaterUseWinterConsumed Property Type Number Description Cooling Tower Water use (winter average) (afday) Consumed. Retrieved from "http:...

155

Property:CoolingTowerWaterUseSummerConsumed | Open Energy Information  

Open Energy Info (EERE)

Name CoolingTowerWaterUseSummerConsumed Property Type Number Description Cooling Tower Water use (summer average) (afday) Consumed. Retrieved from "http:en.openei.orgw...

156

Property:CoolingTowerWaterUseAnnlAvgConsumed | Open Energy Information  

Open Energy Info (EERE)

Name CoolingTowerWaterUseAnnlAvgConsumed Property Type Number Description Cooling Tower Water use (annual average) (afday) Consumed. Retrieved from "http:en.openei.orgw...

157

Property:CoolingTowerWaterUseSummerGross | Open Energy Information  

Open Energy Info (EERE)

Property Name CoolingTowerWaterUseSummerGross Property Type Number Description Cooling Tower Water use (summer average) (afday) Gross. Retrieved from "http:en.openei.orgw...

158

Purification of water from cooling towers and other heat exchange systems  

SciTech Connect

The amount of silica in cooling tower water is reduced by passing cooling tower water through a column of silica gel.

Sullivan; Enid J. (Los Alamos, NM), Carlson; Bryan J. (Ojo Caliente, NM), Wingo; Robert M. (Los Alamos, NM), Robison; Thomas W. (Stilwell, KS)

2012-08-07T23:59:59.000Z

159

Dynamic analysis of guyed towers subjected to wind loads incorporating nonlinearity of the guys.  

E-Print Network (OSTI)

??Guyed masts are unique civil engineering structures, structurally efficient, selfsupporting lattice towers. High structural efficiency of guyed towers is achieved by the use of pre-tensioned… (more)

Kaul, Rohit

1999-01-01T23:59:59.000Z

160

Performance evaluation of wet-cooling tower fills with computational fluid dynamics.  

E-Print Network (OSTI)

??ENGLISH ABSTRACT: A wet-cooling tower fill performance evaluation model developed by Reuter is derived in Cartesian coordinates for a rectangular cooling tower and compared to… (more)

Gudmundsson, Yngvi

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Windows Installation Notes for EXPGUI  

Science Conference Proceedings (OSTI)

... These notes describe how GSAS & EXPGUI are installed using separate distribution files for GSAS, EXPGUI and Tcl/Tk. ...

162

Power Tower Technology Roadmap and cost reduction plan.  

DOE Green Energy (OSTI)

Concentrating solar power (CSP) technologies continue to mature and are being deployed worldwide. Power towers will likely play an essential role in the future development of CSP due to their potential to provide dispatchable solar electricity at a low cost. This Power Tower Technology Roadmap has been developed by the U.S. Department of Energy (DOE) to describe the current technology, the improvement opportunities that exist for the technology, and the specific activities needed to reach the DOE programmatic target of providing competitively-priced electricity in the intermediate and baseload power markets by 2020. As a first step in developing this roadmap, a Power Tower Roadmap Workshop that included the tower industry, national laboratories, and DOE was held in March 2010. A number of technology improvement opportunities (TIOs) were identified at this workshop and separated into four categories associated with power tower subsystems: solar collector field, solar receiver, thermal energy storage, and power block/balance of plant. In this roadmap, the TIOs associated with power tower technologies are identified along with their respective impacts on the cost of delivered electricity. In addition, development timelines and estimated budgets to achieve cost reduction goals are presented. The roadmap does not present a single path for achieving these goals, but rather provides a process for evaluating a set of options from which DOE and industry can select to accelerate power tower R&D, cost reductions, and commercial deployment.

Mancini, Thomas R.; Gary, Jesse A. (U.S. Department of Energy); Kolb, Gregory J.; Ho, Clifford Kuofei

2011-04-01T23:59:59.000Z

163

Experimental Investigation of the Padding Tower for Air Dehumidifier  

E-Print Network (OSTI)

Air conditioning with all fresh air is founded on the principle of dehumidifying by liquid desiccant. It has the characteristics of being clean, power-saving, easy to operate, and requiring low-grade heat. It is suitable for applying waste heat, and solar power as the heat source for regeneration. Hence, this system has a great latent potential for energy savings and environmental protection. The system chooses the padding tower as a dehumidifier and regenerator, which are often used in petrochemical industry. The system chooses a padding tower as a dehumidifier, and LiCl-Water as a liquid desiccant. The vapor in the air is absorbed by the spray of the LiCl solution, and then the absorbed vapor will be released by heating the absorbent. These processes form the circle of absorptive refrigeration operating in atmospheric pressure. This paper describes studies on the theory and experiment of the padding tower of the dehumidifying air conditioning, including selecting different padding and measuring the speed of the air flow and the solution flow and the pressure drop between the layers of the padding. The experimental and computational results indicate that the design parameters of the padding tower significantly influence the characteristics of the liquid desiccant air conditioning. Of these design parameters, the framework of the padding tower, ratio of the air and the concentration of the inlet solution is largest through the tower, the temperature and effects of the dehumidifying capability of the tower.

Wang, J.; Liu, J.; Li, C.; Zhang, G.; An, S.

2006-01-01T23:59:59.000Z

164

Approximation Algorithm for Multiple-Tool Milling  

E-Print Network (OSTI)

Milling is the mechanical process of removing material from a piece of stock through the use of a rapidly spinning circular milling tool in order to form some desired geometric shape. An important problem in computer-aided design and manufacturing is the automated generation of efficient milling plans for computerized numerically controlled (CNC) milling machines. Among the most common milling problems is simple 2-dimensional pocket milling: cut a given 2-dimensional region down to some constant depth using a given set of milling tools. Most of the research in this area has focused on generating such milling plans assuming that the machine has a tool of a single size. Since modern CNC milling machines typically have access to a number of milling tools of various sizes and the ability to change tools automatically, this raises the important optimization problem of generating efficient milling plans that take advantage of this capability to reduce the total milling time. We consider the ...

Sunil Arya; Siu-Wing Cheng; David M. Mount

1999-01-01T23:59:59.000Z

165

Use of nanofiltration to reduce cooling tower water consumption.  

Science Conference Proceedings (OSTI)

Nanofiltration (NF) can effectively treat cooling-tower water to reduce water consumption and maximize water usage efficiency of thermoelectric power plants. A pilot is being run to verify theoretical calculations. A side stream of water from a 900 gpm cooling tower is being treated by NF with the permeate returning to the cooling tower and the concentrate being discharged. The membrane efficiency is as high as over 50%. Salt rejection ranges from 77-97% with higher rejection for divalent ions. The pilot has demonstrated a reduction of makeup water of almost 20% and a reduction of discharge of over 50%.

Altman, Susan Jeanne; Ciferno, Jared

2010-10-01T23:59:59.000Z

166

Use of nanofiltration to reduce cooling tower water usage.  

SciTech Connect

Nanofiltration (NF) can effectively treat cooling-tower water to reduce water consumption and maximize water usage efficiency of thermoelectric power plants. A pilot is being run to verify theoretical calculations. A side stream of water from a 900 gpm cooling tower is being treated by NF with the permeate returning to the cooling tower and the concentrate being discharged. The membrane efficiency is as high as over 50%. Salt rejection ranges from 77-97% with higher rejection for divalent ions. The pilot has demonstrated a reduction of makeup water of almost 20% and a reduction of discharge of over 50%.

Sanchez, Andres L.; Everett, Randy L.; Jensen, Richard Pearson; Cappelle, Malynda A.; Altman, Susan Jeanne

2010-09-01T23:59:59.000Z

167

Colony Mills Limited | Open Energy Information  

Open Energy Info (EERE)

Mills Limited Jump to: navigation, search Name Colony Mills Limited Place Lahore, Pakistan Sector Solar Product Yarn manufacturer, plans to set up solar thermal plant....

168

American Tower Company | Open Energy Information  

Open Energy Info (EERE)

Company Company Jump to: navigation, search Name American Tower Company Address P.O. Box 29 Place Shelby, Ohio Zip 44875 Sector Wind energy Product Agriculture;Business and legal services; Energy audits/weatherization; Engineering/architectural/design; Manufacturing; Retail product sales and distribution Phone number 419-347-1185 Website http://www.amertower.com Coordinates 40.8814452°, -82.6618424° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.8814452,"lon":-82.6618424,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

169

The Tower Shielding Facility: Its glorious past  

Science Conference Proceedings (OSTI)

The Tower Shielding Facility (TSF) is the only reactor facility in the US that was designed and built for radiation-shielding studies in which both the reactor source and shield samples could be raised into the air to allow measurements to be made without interference from ground scattering or other spurious effects. The TSF proved its usefulness as many different programs were successfully completed. It became active in work for the Defense Atomic Support Agency (DASA) Space Nuclear Auxiliary Power, Defense Nuclear Agency, Liquid Metal Fast Breeder Reactor Program, the Gas-Cooled and High-Temperature Gas-Cooled Reactor programs, and the Japanese-American Shielding Program of Experimental Research, just to mention a few of the more extensive ones. The history of the TSF as presented in this report describes the various experiments that were performed using the different reactors. The experiments are categorized as to the programs which they supported and placed in corresponding chapters. The experiments are described in modest detail, along with their purpose when appropriate. Discussion of the results is minimal, but references are given to more extensive topical reports.

Muckenthaler, F.J.

1997-05-07T23:59:59.000Z

170

Don Ana Sun Tower Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Don Ana Sun Tower Solar Power Plant Don Ana Sun Tower Solar Power Plant Jump to: navigation, search Name Don Ana Sun Tower Solar Power Plant Facility Don Ana Sun Tower Sector Solar Facility Type Concentrating Solar Power Developer NRG Energy/eSolar Location Dona Ana County, New Mexico Coordinates 32.485767°, -106.7234639° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.485767,"lon":-106.7234639,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

171

Alpine SunTower Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

SunTower Solar Power Plant SunTower Solar Power Plant Jump to: navigation, search Name Alpine SunTower Solar Power Plant Facility Alpine SunTower Sector Solar Facility Type Concentrating Solar Power Developer NRG Energy/eSolar Location Lancaster, California Coordinates 34.6867846°, -118.1541632° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.6867846,"lon":-118.1541632,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

172

Meteorological Tower Measurements of a Surface Cold Front  

Science Conference Proceedings (OSTI)

measurements from the Boulder Atmospheric Observatory meteorological research tower are used to describe the structure and physical processes of a strong surface cold front. Analysis reveals that the horizontal gradients in temperature and wind ...

M. A. Shapiro

1984-08-01T23:59:59.000Z

173

Advanced Lighting Controls - My Venture from the Ivory Tower  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Lighting Controls - My Venture from the Ivory Tower Speaker(s): Charlie Huizenga Date: June 15, 2012 - 12:00pm Location: 90-3122 Seminar HostPoint of Contact: Dragan...

174

Offshore Tower Shading Effects on In-Water Optical Measurements  

Science Conference Proceedings (OSTI)

A field campaign was performed to estimate the shading effect induced on in-water irradiance and radiance measurements taken in the immediate vicinity of the Acqua Alta Oceanographic Tower (AAOT), located in the northern Adriatic Sea, which is ...

Giuseppe Zibordi; John Piero Doyle; Stanford B. Hooker

1999-11-01T23:59:59.000Z

175

Power Tower Systems for Concentrating Solar Power | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

known as heliostats, focus sunlight onto a receiver at the top of a tall tower. A heat-transfer fluid heated in the receiver is used to generate steam, which, in turn, is...

176

Introducing an Online Cooling Tower Performance Analysis Tool  

E-Print Network (OSTI)

Cooling towers are used extensively for numerous industrial, residential, and commercial applications. Yet despite how common their uses, operators often do not know how to properly evaluate and optimize their performance. This is due to the complex and variable nature of all of the factors that can influence performance; fan speed, wind speed, sump temperature, heat load, ambient temperature, relative humidity, etc. This can be overwhelming for a regular operator resulting in many cooling towers being set to a default operating condition and forgotten. This paper will introduce a web-based cooling tower analysis tool being developed to help users understand and optimize operational efficiency. The calculations, evaluations, and models will be discussed in detail to highlight important design considerations and issues. This will include how the Merkel Theory, psychometric properties, tower types, and historical weather data are incorporated into the analysis.

Muller, M.R.; Muller, M.B.; Rao, P.

2012-01-01T23:59:59.000Z

177

User's Manual: Cooling-Tower-Plume Prediction Code  

Science Conference Proceedings (OSTI)

Utilities planning to build generating plants that use evaporative cooling are required to estimate potential seasonal and annual environmental effects of cooling-tower plumes. An easy-to-use computerized method is now available for making such estimates.

1984-04-01T23:59:59.000Z

178

Wind Shear Characteristics at Central Plains Tall Towers: Preprint  

SciTech Connect

Conference paper for WindPower 2006 held June 4-7, 2006, in Pittsburgh, PA, describing the wind shear characteristics at tall tower sites in the Central Plains of the United States.

Schwartz, M.; Elliott, D.

2006-06-01T23:59:59.000Z

179

DRIFT : a numerical simulation solution for cooling tower drift eliminator performance  

E-Print Network (OSTI)

A method for the analysis of the performance of standard industrial evaporative cooling tower drift

Chan, Joseph Kwok-Kwong

180

Best Practice for Energy Efficient Cleanrooms: Cooling tower and condenser water optimization  

E-Print Network (OSTI)

condenser water optimization Tengfang Xu Contents HVAC WATERHVAC Water Systems Cooling tower and condenser water optimization

Xu, Tengfang

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

HTAR Client Configuration and Installation  

NLE Websites -- All DOE Office Websites (Extended Search)

Configuration and Installation Configuration and Installation HTAR Configuration and Installation HTAR is an archival utility similar to gnu-tar that allows for the archiving and extraction of local files into and out of HPSS. Configuration Instructions This distribution has default configuration settings which will work for most environments. If you want to use the default values (recommended) you can skip to the section labeled INSTALLATION INSTRUCTIONS. In certain environments, for example if your installation is on a machine which has more than one network interface, you may want to change some of these default settings. To help with this, an interactive Configure script is provided. To use it do $ ./Configure prior to installing. Configure will provide a description of the options

182

Cooling Tower Optimization Study Technical Update for 2012  

Science Conference Proceedings (OSTI)

This report is a technical update on the progress of testing three different configurations of cooling tower fan drives. The particular focus is upon the gear box where most disabling failures are occurring. It will describe the configurations and instrumentation used to track the ongoing operational conditions being monitored.The standard mode of operation for a cooling tower fan motor is either on or off, as it may be cost-effective to take some cells out of service under certain ...

2012-12-20T23:59:59.000Z

183

International cooling-tower and spray pond symposium  

Science Conference Proceedings (OSTI)

This document contains the manuscripts of sixty-one papers that were presented at the 7th Cooling Tower and Spray Pond Symposium of the International Association for Hydraulic Research, organized by the B.E. Vedeneev Institute (VNIIG) and held in Leningrad, USSR, in June 1990. This report represents a worldwide state-of-the-art survey of recent work on cooling towers and spray ponds. Individual papers are indexed separately on the energy database.

Not Available

1990-09-01T23:59:59.000Z

184

Environmental Impacts from the Operation of Cooling Towers at SRP  

SciTech Connect

An assessment has been made of the environmental effects that would occur from the operation of cooling towers at the SRP reactors. A more realistic numerical model of the cooling tower plume has been used to reassess the environmental impacts. The following effects were considered: (1) the occurrence of fog and ice and their impact on nearby structures, (2) drift and salt deposition from the plume, (3) the length and height of the visible plume, and (4) the possible dose from tritium.

Smith, F.G. III

2001-06-26T23:59:59.000Z

185

2010sr27[cooling_tower_complete].doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Friday, September 17, 2010 Friday, September 17, 2010 james-r.giusti@srs.gov Paivi Nettamo, SRNS, (803) 952-6938 paivi.nettamo@srs.gov K Cooling Tower Project Reaches Completion Aiken, S.C. - One of the most visual milestones of cleanup projects underway within the Department of Energy's Office of Environmental Management was the demolition of the K-Reactor Cooling Tower at the Savannah River Site (SRS). Now, this American Recovery and Reinvestment Act project has been

186

Guidelines for solar energy installations  

SciTech Connect

Guidelines for solar energy installations are presented. The guideline is published in code form so that it can be used directly as the text of an ordinance to regulate the installation of solar systems. An index contains cross references to sections of existing model codes that are applicable to solar installations. Wind energy systems, passive solar space conditioning systems, photovoltaic systems, and systems involving mechanical compression of refrigerants are not included.

1984-01-01T23:59:59.000Z

187

NREL: Technology Deployment - NREL Helps U.S. Virgin Islands Install Wind  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL Helps U.S. Virgin Islands Install Wind Testing Equipment NREL Helps U.S. Virgin Islands Install Wind Testing Equipment Photo of wind turbines being erected. NREL's analysis and technical expertise is helping the U.S. Virgin Islands find ways to reduce fossil fuel use by 60% through the development of utility-scale wind opportunities. January 10, 2013 With the help of NREL, the U.S. Virgin Islands (USVI) recently marked a major milestone on the way toward its goal of a 60% reduction in fossil fuel use by 2025. In December, NREL experts assisted with the installation of wind anemometer towers and sonic detection and ranging (SODAR) equipment on the islands of St. Thomas and St. Croix to collect data that will be used for the development of a utility-scale wind project in the territory. The installation represents how the USVI is moving forward with NREL's

188

ASHRAE Installs New Officers, Directors DENVER ASHRAE has installed  

E-Print Network (OSTI)

ASHRAE Installs New Officers, Directors DENVER ­ ASHRAE has installed new officers and directors for 2013-14 at its Annual Meeting held here June 22-26. The ASHRAE Presidential Address is viewable on You is William P. "Bill" Bahnfleth, Ph.D., P.E., Fellow ASHRAE, ASME Fellow, a professor of Architectural

Maroncelli, Mark

189

Wind Shear Characteristics at Central Plains Tall Towers  

Science Conference Proceedings (OSTI)

The object of this study is to analyze wind shear characteristics at tall tower sites in the Central Plains of the United States. The hub heights of modern turbines used for wind farm projects are now 70 meters (m) to 100 m above ground and some advanced turbines under development for deployment during the second half of this decade are rated at 2-5 megawatts of energy generation with rotor diameters near 100 m and hub heights of 100-120 m. These advanced turbines will take advantage of the higher wind speeds aloft to generate more wind energy. Specific knowledge of important wind shear characteristics near and at turbine hub height is needed to optimize turbine design and wind farm layout. Unfortunately, wind speed shear measurements at heights of 80-120 m were virtually nonexistent a few years ago and are still quite uncommon today. The Central Plains is a prime wind energy development region and knowledge about the wind shear characteristics will reduce uncertainty about the resource and enhance wind farm design. Previous analyses of tall tower data (Schwartz and Elliott, 2005) concentrated on data from specific states. The wind energy community has recognized the need to fill the gap of direct wind speed measurements at levels 70 m and higher above the ground. Programs instituted during the last 5 years at the state level and supported by the U.S. Department of Energy's (DOE) State Energy Program initiative have placed anemometers and vanes at several levels on existing tall (70 m+) communication towers. The Central Plains has a fairly high concentration of tall tower sites. The distribution of tall tower sites varies among the states in the Central Plains, because the tall tower program is new and the available state and federal funding to establish tall towers is variable. Our wind resource assessment group at DOE's National Renewable Energy Laboratory (NREL) has obtained much of these necessary measurement data from both individual state sources and regional organizations. Most of the data are available to the public, though data from one tower in Colorado are proprietary. We have begun to analyze important wind climate parameters, including wind shear from the tall towers. A total of 13 tall towers were used for this study. Eleven of the towers had the highest anemometer level between 100 m and 113 m. Two towers had the highest measurement level between 70 m and 85 m above ground. The distribution of the towers among the states is: two sites in Texas and Oklahoma; six sites in Kansas; and one site each in Colorado, South Dakota, and North Dakota. Figure 1 shows the locations and names of the thirteen towers. The wind resource at these sites can be classified as ranging from good-to-excellent. Eight tall tower sites have Class 3 resource, four sites have Class 4 resource, and one has Class 5 resource at 50 m.

Schwartz, M.; Elliott, D.

2006-01-01T23:59:59.000Z

190

Impact evaluation of energy conservation measures installed at a new industrial facility  

SciTech Connect

This paper presents the pros and cons of several energy, savings estimating methods considered as part of a recent impact evaluation of energy conservation measures installed at a lumber mill in the Pacific Northwest. The energy conservation measures (adjustable speed drives, programmable logic controllers, and high efficiency motors) were installed when the mill was initially constructed rather than being installed as a retrofit. Therefore, direct measurement of baseline energy consumption was impossible. As described in this paper, several reasonable methods can be formulated for estimating the energy savings when a physical baseline does not exist. The alternative methods will often result in radically different energy savings estimates, which may translate into significantly different conclusions regarding the efficacy of the energy conservation measures and/or the energy conservation program being evaluated. Therefore, it is critical to understand and carefully consider the options for estimating energy savings when a physical baseline does not exist.

Brown, D.R.; Spanner, G.E. [Pacific Northwest Lab., Richland, WA (United States); Riewer, S. [USDOE Bonneville Power Administration, Portland, OR (United States)

1995-08-01T23:59:59.000Z

191

Task analysis for solar installers  

SciTech Connect

The process focused on the sequential identification and field validation of the tasks actually performed. This method provides an accurate picture of what happens on the roof. Forty-six solar firms were identified as the population; 29 (63%) participated in the validation project. We identified 8 duty areas and 46 tasks. The overall response rate for the occupational task list is 100% except for tasks under the duty of constructing solar collectors. Only eight of the twenty-nine respondents (28%) indicated that solar installers fabricate collectors. This shows that solar installers do not manufacture collectors and only perform tasks directly related to installation. Additional findings from our study indicate that instructional materials designed for solar installers need to be standardized and made task-specific. The tasks identified in this research should form the foundation for a competency-based curriculum for solar water heater installers.

Harrison, J.; LaHart, D.

1982-01-01T23:59:59.000Z

192

Alloy by Double Mechanical Milling  

Science Conference Proceedings (OSTI)

The results show that the morphology of double mechanical milling powder is regular and the TiAl phase and Ti3Al phase were observed in the powders.

193

WebCAT: Installation Instructions for Windows  

Science Conference Proceedings (OSTI)

... WebCAT. Note: Windows ME does not ship with a webserver; Apache can be installed. Download and Install, Download ...

194

VOC Control in Kraft Mills  

Science Conference Proceedings (OSTI)

The formation of volatile organic compounds (VOCs), such as methanol, in kraft mills has been an environmental concern. Methanol is soluble in water and can increase the biochemical oxygen demand. Furthermore, it can also be released into atmosphere at the process temperatures of kraft mill-streams. The Cluster Rule of the EPA now requires the control of the release of methanol in pulp and paper mills. This research program was conducted to develop a computer simulation tool for mills to predict VOC air emissions. To achieve the objective of the research program, much effort was made in the development of analytical techniques for the analysis of VOC and determination of vapor liquid partitioning coefficient of VOCs in kraft mill-streams using headspace gas chromatography. With the developed analytical tool, methanol formation in alkaline pulping was studied in laboratory to provide benchmark data of the amount of methanol formation in pulping in kraft mills and for the validation of VOC formation and vapor-liquid equilibrium submodels. Several millwide air and liquid samplings were conducted using the analytical tools developed to validate the simulation tool. The VOC predictive simulation model was developed based on the basic chemical engineering concepts, i.e., reaction kinetics, vapor liquid equilibrium, combined with computerized mass and energy balances. Four kraft mill case studies (a continuous digester, two brownstock washing lines, and a pre-evaporator system) are presented and compared with mill measurements. These case studies provide valuable, technical information for issues related to MACT I and MACT II compliance, such as condensate collection and Clean-Condensate-Alternatives (CCA).

Zhu, J.Y.; Chai, X.-S.; Edwards, L.L.; Gu, Y.; Teja, A.S.; Kirkman, A.G.; Pfromm, P.H.; Rezac, M.E.

2001-09-26T23:59:59.000Z

195

Yang-Mills algebra.  

E-Print Network (OSTI)

Some unexpected properties of the cubic algebra generated by the covariant derivatives of a generic Yang-Mills connection over the (s+1)-dimensional pseudo Euclidean space are pointed out. This algebra is Gorenstein and Koszul of global dimension 3 but except for s=1 (i.e. in the 2-dimensional case) where it is the universal enveloping algebra of the Heisenberg Lie algebra and is a cubic Artin-Schelter regular algebra, it fails to be regular in that it has exponential growth. We give an explicit formula for the Poincare series of this algebra A and for the dimension in degree n of the graded Lie algebra of which A is the universal enveloping algebra. In the 4-dimensional (i.e. s=3) Euclidean case, a quotient of this algebra is the quadratic algebra generated by the covariant derivatives of a generic (anti) self-dual connection. This latter algebra is Koszul of global dimension 2 but is not Gorenstein and has exponential growth. It is the universal enveloping algebra of the graded Lie-algebra which is the semi-direct product of the free Lie algebra with three generators of degree one by a derivation of degree one.

Alain Connes; Michel Dubois-Violette.

196

Analysis of mass transfer performance in an air stripping tower  

Science Conference Proceedings (OSTI)

The carryover of working solution in a traditional stripping tower is of serious concern in real applications. A U-shaped spray tower to prevent carryover has been designed to study the stripping of water vapor from aqueous desiccant solutions of 91.8 to 95.8 wt% triethylene glycol. In this study, water vapor was removed from the diluted desiccant solution by heating the solution and stripping it with the ambient air. Therefore, the solution was concentrated to a desired concentration. This spray tower was capable of handling air flow rates from 3.2 to 5.13 kg/min and liquid flow rates from 1.6 to 2.76 kg/min. Since the literature data on air stripping towers are limited, studies on the mass transfer coefficient and other mass transfer parameters were carried out in this study. Under the operating conditions, the overall mass transfer coefficient calculated from the experimental data varied from 0.053 to 0.169 mol/m{sup 3}{center{underscore}dot}s. These corresponded to heights of a transfer unit of 2.3 to 0.71 m, respectively. The rates of stripping in this spray tower were typically varied from 2.28 to 12.15 kg H{sub 2}O/h. A correlation of the mass transfer coefficient for the air stripping process was also developed in this study.

Chung, T.W.; Lai, C.H.; Wu, H.

1999-10-01T23:59:59.000Z

197

Integrated reactor-containment hyperbolic-cooling-tower system  

Science Conference Proceedings (OSTI)

A preliminary feasibility analysis has been conducted to evaluate placing a nuclear reactor containment building inside a large hyperbolic cooling tower, a concept previously suggested for fossil-fired units but for reasons other than those that motivate this evaluation. The geometry of the design, the amount of water available, and the shielding provided by the cooling tower are beneficial to the safety characteristics of the containment under accident conditions. Three means of decay heat management are employed: an initial water spray on the containment exterior, long-term air convection on side of the containment, and creation of a water pool inside the containment. A continuously spraying water tank on top of the containment allows for a completely passive decay heat removal system. An annular air chimney around the containment is effective in long-term removal of {approximately} 1O MW (thermal) through air convection. Five percent of the water inventory in the cooling-tower pond surrounding the containment is sufficient to flood the containment interior to a depth of 14.6 ft, thereby providing an internal containment heat sink. The packing and the height of the tower provide major scrubbing and dispersing sources for any uncontrolled radioactive leak. The cooling tower veil also protects the containment from external events such as lane crashes.

Patel, A.R.; Todreas, N.E.; Driscoll, M.J. [Massachusetts Institute of Technology, Cambridge, MA (United States)

1994-12-31T23:59:59.000Z

198

Efficient Tool Paths and Part Orientation for Face Milling  

E-Print Network (OSTI)

Avoiding Tool Exit in Planar Milling by Adjusting Width oftime. The most common face milling tool paths employed areand Part Orientation for Face Milling A. Rangarajan 1 , D.

Rangarajan, Arvind; Dornfeld, David

2004-01-01T23:59:59.000Z

199

Milling Stone Cultures in Northern California: Berryessa I  

E-Print Network (OSTI)

Weight 313 g. Edge angle MILLING STONE CULTURES IN NORTHERNSite and the Early Milling Stone Cultures of SouthernMilling Stone Cultures in Northern California: Berryessa I

True, D. L; Baumhoff, M. A; Hellen, J. E

1979-01-01T23:59:59.000Z

200

Feasible Offset Region Based Tool Path Planning for Face Milling  

E-Print Network (OSTI)

Path Planning for Face Milling, Masters Report, UniversityPath Planning for Face Milling Prabhu Ramachandran Sponsoredburr formation while face milling powertrain components in

Ramachandran, Prabhu; Dornfeld, David A

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Review of Geometric Solutions for Milling Burr Prediction and Minimization  

E-Print Network (OSTI)

height and thickness in face milling operation. Trans. ASME,Burr prediction system for face milling operation. Mastersminimi- zation in face milling: a geometric approach. Trans,

Tripathi, Shantanu; Dornfeld, David

2006-01-01T23:59:59.000Z

202

Comments of Mille Lacs Energy Cooperative | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mille Lacs Energy Cooperative Comments of Mille Lacs Energy Cooperative Comments of Mille Lacs Energy Cooperative on Implementing the National Broadband Plan by Studying the...

203

In-Process Separation of Mill Scale From Oil at Steel Hot Rolling Mills  

Science Conference Proceedings (OSTI)

It is of vital importance to find cost-effective technologies of reducing oil concentration in mill scale in order to recycle the mill scale without causing detrimental ...

204

Solar Installation Labor Market Analysis  

DOE Green Energy (OSTI)

The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

Friedman, B.; Jordan, P.; Carrese, J.

2011-12-01T23:59:59.000Z

205

Net Zero Energy Installations (Presentation)  

SciTech Connect

A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.

Booth, S.

2012-05-01T23:59:59.000Z

206

Energy Efficiency Evaluation of Guangzhou West Tower Façade System  

E-Print Network (OSTI)

Guangzhou West Tower is an extremely tall public building. The energy efficiency evaluation of its façade should be different than that of ordinary public buildings. Based on the national code GB50189-2005, “Design Standard for Energy efficiency of Public Buildings”, typical meteorological yearly data for Guangzhou were used and revised according to architectural character of Guangzhou West Tower. The energy efficiency design of a single skin façade and active airflow curtain wall was analyzed by a dynamic energy simulation tool and modified weather data. The payback period of initial investment in the façade system was evaluated based on simulation results. In addition, the results confirm the façade system scheme of Guangzhou West Tower.

Meng, Q.; Zhang, L.

2006-01-01T23:59:59.000Z

207

Conversion of Solar Two to a Kokhala hybrid power tower  

DOE Green Energy (OSTI)

The continued drop in energy prices and restructuring of the utility industry have reduced the likelihood that a follow-on commercial 100-MW, power tower project will be built immediately following the Solar Two demonstration project. Given this, it would be desirable to find a way to extend the life of the Solar Two project to allow the plant to operate as a showcase for future power tower projects. This paper looks at the possibility of converting Solar Two into a commercial Kokhala hybrid power tower plant at the end of its demonstration period in 1998. The study identifies two gas turbines that could be integrated into a Kokhala cycle at Solar Two and evaluates the design, expected performance, and economics of each of the systems. The study shows that a commercial Kokhala project at Solar Two could produce power at a cost of less than 7 e/kWhr.

Price, H.W.

1997-06-01T23:59:59.000Z

208

Technical Evaluation of Side Stream Filtration for Cooling Towers  

NLE Websites -- All DOE Office Websites (Extended Search)

Cooling Towers (photo from Pacific Cooling Towers (photo from Pacific Northwest National Laboratory) * Scaling: Scaling is the precipitation of dissolved mineral components that have become saturated in solution, which can lower efficiency of the system. * Fouling: Fouling occurs when suspended particles or biologic growth forms an insulating film on heat transfer surfaces. Common foulants include organic matter, process oils, and silt, which can also lower system performance. * Microbiological Activity: Microbiological activity refers to microorganisms that live and grow in the cooling system that can contribute

209

Technical Evaluation of Side Stream Filtration for Cooling Towers  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cooling Towers (photo from Pacific Cooling Towers (photo from Pacific Northwest National Laboratory) * Scaling: Scaling is the precipitation of dissolved mineral components that have become saturated in solution, which can lower efficiency of the system. * Fouling: Fouling occurs when suspended particles or biologic growth forms an insulating film on heat transfer surfaces. Common foulants include organic matter, process oils, and silt, which can also lower system performance. * Microbiological Activity: Microbiological activity refers to microorganisms that live and grow in the cooling system that can contribute

210

Solar Two: A successful power tower demonstration project  

DOE Green Energy (OSTI)

Solar Two, a 10MWe power tower plant in Barstow, California, successfully demonstrated the production of grid electricity at utility-scale with a molten-salt solar power tower. This paper provides an overview of the project, from inception in 1993 to closure in the spring of 1999. Included are discussions of the goals of the Solar Two consortium, the planned-vs.-actual timeline, plant performance, problems encountered, and highlights and successes of the project. The paper concludes with a number of key results of the Solar Two test and evaluation program.

REILLY,HUGH E.; PACHECO,JAMES E.

2000-03-02T23:59:59.000Z

211

Comparison of Second Wind Triton Data with Meteorological Tower Measurements  

DOE Green Energy (OSTI)

With the increased interest in remote sensing of wind information in recent years, it is important to determine the reliability and accuracy of new wind measurement technologies if they are to replace or supplement conventional tower-based measurements. In this study, we present the results of an analysis characterizing the measurement performance of a state-of-the-art SOund Detection And Ranging (sodar) device when compared to a high-quality tower measurement program. Second Wind Inc. (Somerville, MA, USA) provided NREL with more than six months of data from a measurement program conducted near an operating wind farm in western Texas.

Scott, G.; Elliott, D.; Schwartz, M.

2010-02-01T23:59:59.000Z

212

Dry cooling tower operating experience in the LOFT reactor  

SciTech Connect

A dry cooling tower has been uniquely utilized to dissipate heat generated in a small experimental pressurized water nuclear reactor. Operational experience revealed that dry cooling towers can be intermittently operated with minimal wind susceptibility and water hammer occurrences by cooling potential steam sources after a reactor scram, by isolating idle tubes from the external atmosphere, and by operating at relatively high pressures. Operating experience has also revealed that tube freezing can be minimized by incorporating the proper heating and heat loss prevention features.

Hunter, J.A.

1980-01-01T23:59:59.000Z

213

Modeling, loading, and preliminary design considerations for tall guyed towers  

Science Conference Proceedings (OSTI)

In this paper, the authors first summarize the results of an investigation they carried out on the collapse of a 1900 ft tall guyed tower under ice and wind loads. Based on this investigation, they then proceed to present some structural analysis recommendations relating to loading and modeling concerns. Special emphasis is placed on the importance of ice loading, and on the level of accuracy required in modeling the nonlinear response behavior. Finally, the conclusions drawn from this study are used to formulate preliminary design guidelines. This facilitates a systematic approach for the design of tall guyed towers. 23 refs.

Gantes, C.; Khoury, R.; Connors, J.J.; Pouangare, C. [Engg Information Technology, Cambridge, MA (United States)

1993-12-01T23:59:59.000Z

214

On Why Disks Generate Magnetic Towers and Collimate Jets  

E-Print Network (OSTI)

We show that accretion disks with magnetic fields in them ought to make jets provided that their electrical conductivity prevents slippage and there is an ambient pressure in their surroundings. We study equilibria of highly wound magnetic structures. General Energy theorems demonstrate that they form tall magnetic towers whose height grows with every turn at a velocity related to the circular velocity in the accretion disk. The pinch effect amplifies the magnetic pressures toward the axis of the towers whose stability is briefly considered.

D Lynden-Bell

2002-08-21T23:59:59.000Z

215

On Why Disks Generate Magnetic Towers and Collimate Jets  

E-Print Network (OSTI)

We show that accretion disks with magnetic fields in them ought to make jets provided that their electrical conductivity prevents slippage and there is an ambient pressure in their surroundings. We study equilibria of highly wound magnetic structures. General Energy theorems demonstrate that they form tall magnetic towers whose height grows with every turn at a velocity related to the circular velocity in the accretion disk. The pinch effect amplifies the magnetic pressures toward the axis of the towers whose stability is briefly considered.

Lynden-Bell, Donald

2002-01-01T23:59:59.000Z

216

Gas fluidized-bed stirred media mill  

DOE Patents (OSTI)

A gas fluidized-bed stirred media mill is provided for comminuting solid ticles. The mill includes a housing enclosing a porous fluidizing gas diffuser plate, a baffled rotor and stator, a hollow drive shaft with lateral vents, and baffled gas exhaust exit ports. In operation, fluidizing gas is forced through the mill, fluidizing the raw material and milling media. The rotating rotor, stator and milling media comminute the raw material to be ground. Small entrained particles may be carried from the mill by the gas through the exit ports when the particles reach a very fine size.

Sadler, III, Leon Y. (Tuscaloosa, AL)

1997-01-01T23:59:59.000Z

217

MILLING OPERATIONS Milling is the process of machining flat, curved, or Milling machines are basically classified as vertical or  

E-Print Network (OSTI)

-speed steel, stellite, and cemented carbide cutters reamer shank. In this case, one or two side milling have

Gellman, Andrew J.

218

SunShot Initiative: Solar Power Tower Improvements with the Potential to  

NLE Websites -- All DOE Office Websites (Extended Search)

Solar Power Tower Improvements Solar Power Tower Improvements with the Potential to Reduce Costs to someone by E-mail Share SunShot Initiative: Solar Power Tower Improvements with the Potential to Reduce Costs on Facebook Tweet about SunShot Initiative: Solar Power Tower Improvements with the Potential to Reduce Costs on Twitter Bookmark SunShot Initiative: Solar Power Tower Improvements with the Potential to Reduce Costs on Google Bookmark SunShot Initiative: Solar Power Tower Improvements with the Potential to Reduce Costs on Delicious Rank SunShot Initiative: Solar Power Tower Improvements with the Potential to Reduce Costs on Digg Find More places to share SunShot Initiative: Solar Power Tower Improvements with the Potential to Reduce Costs on AddThis.com... Concentrating Solar Power

219

Property:CoolingTowerWaterUseAnnlAvgGross | Open Energy Information  

Open Energy Info (EERE)

Property Name CoolingTowerWaterUseAnnlAvgGross Property Type Number Description Cooling Tower Water use (annual average) (afday) Gross. Retrieved from "http:en.openei.orgw...

220

Microphysical Measurements from an Aircraft Ascending with a Growing Isolated Maritime Cumulus Tower  

Science Conference Proceedings (OSTI)

The development of precipitation in the top of an isolated maritime cumulus tower is traced by four rapid penetrations with an instrumented aircraft between 400 and 1000 m below the visible top of the growing tower. The hydrometeor distribution ...

Paul T. Willis; John Hallett

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

A New Tall-Tower Meteorological Monitoring System  

SciTech Connect

The Atmospheric Technologies Group of the Savannah River Technology Center operates an extensive meteorological monitoring network of 13 tower in and near the Savannah River Site near Aiken, South Carolina. The data from this system are available in ''real-time'' for emergency response atmospheric release modeling and operational weather forecasting.

Parker, M.J.

2003-01-14T23:59:59.000Z

222

Solar Power Tower Design Basis Document, Revision 0  

DOE Green Energy (OSTI)

This report contains the design basis for a generic molten-salt solar power tower. A solar power tower uses a field of tracking mirrors (heliostats) that redirect sunlight on to a centrally located receiver mounted on top a tower, which absorbs the concentrated sunlight. Molten nitrate salt, pumped from a tank at ground level, absorbs the sunlight, heating it up to 565 C. The heated salt flows back to ground level into another tank where it is stored, then pumped through a steam generator to produce steam and make electricity. This report establishes a set of criteria upon which the next generation of solar power towers will be designed. The report contains detailed criteria for each of the major systems: Collector System, Receiver System, Thermal Storage System, Steam Generator System, Master Control System, and Electric Heat Tracing System. The Electric Power Generation System and Balance of Plant discussions are limited to interface requirements. This design basis builds on the extensive experience gained from the Solar Two project and includes potential design innovations that will improve reliability and lower technical risk. This design basis document is a living document and contains several areas that require trade-studies and design analysis to fully complete the design basis. Project- and site-specific conditions and requirements will also resolve open To Be Determined issues.

ZAVOICO,ALEXIS B.

2001-07-01T23:59:59.000Z

223

800mm luxury : pencil tower phenomenon in Hong Kong, China  

E-Print Network (OSTI)

150m2 - 40m2 - 60m3. Pencil Towers are slender pencil-like apartment buildings. They are commonly found in high-dense Asian cities such as Hong Kong, Tokyo and Singapore. Focusing on Hong Kong as the context of research, ...

Yam, Hiu Lan

2012-01-01T23:59:59.000Z

224

Wind Shear Characteristics at Central Plains Tall Towers (presentation)  

SciTech Connect

The objectives of this report are: (1) Analyze wind shear characteristics at tall tower sites for diverse areas in the central plains (Texas to North Dakota)--Turbines hub heights are now 70-100 m above ground and Wind measurements at 70-100+ m have been rare. (2) Present conclusions about wind shear characteristics for prime wind energy development regions.

Schwartz, M.; Elliott, D.

2006-06-05T23:59:59.000Z

225

Executive Summary: Assessment of Parabolic Trough and Power Tower Solar Technology Cost and Performance Forecasts  

DOE Green Energy (OSTI)

Sargent& Lundy LLC conducted an independent analysis of parabolic trough and power tower solar technology cost and performance.

Not Available

2003-10-01T23:59:59.000Z

226

Assessment of Parabolic Trough and Power Tower Solar Technology Cost and Performance Forecasts  

DOE Green Energy (OSTI)

Sargent and Lundy LLC conducted an independent analysis of parabolic trough and power tower solar technology cost and performance.

Not Available

2003-10-01T23:59:59.000Z

227

NREL: MIDC/National Wind Technology Center M2 Tower (39.91 N...  

NLE Websites -- All DOE Office Websites (Extended Search)

The Measurement and Instrumentation Data Center collects Irradiance and Meterological data from the National Wind Technology Center M2 Tower....

228

installed capacity | OpenEI  

Open Energy Info (EERE)

installed capacity installed capacity Dataset Summary Description Estimates for each of the 50 states and the entire United States show Source Wind Powering America Date Released February 04th, 2010 (4 years ago) Date Updated April 13th, 2011 (3 years ago) Keywords annual generation installed capacity usa wind Data application/vnd.ms-excel icon Wind potential data (xls, 102.4 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period License License Other or unspecified, see optional comment below Comment Work of the U.S. Federal Government. Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset Average vote Your vote Ease of access Average vote Your vote Overall rating Average vote Your vote Comments

229

Solar Installation Labor Market Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Installation Labor Installation Labor Market Analysis Barry Friedman National Renewable Energy Laboratory Philip Jordan Green LMI Consulting John Carrese San Francisco Bay Area Center of Excellence Technical Report NREL/TP-6A20-49339 December 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Solar Installation Labor Market Analysis Barry Friedman National Renewable Energy Laboratory Philip Jordan Green LMI Consulting John Carrese San Francisco Bay Area Center of Excellence

230

Ivaco Rolling Mills LP, Chemistry Laboratory  

Science Conference Proceedings (OSTI)

Ivaco Rolling Mills LP, Chemistry Laboratory. NVLAP Lab Code: 200143-0. Address and Contact Information: Highway 17 ...

2013-09-06T23:59:59.000Z

231

Cray to Install Cascade System at NERSC  

NLE Websites -- All DOE Office Websites (Extended Search)

Cray to Install Cascade System at NERSC Cray to Install Cascade System at NERSC June 27, 2012 by Richard Gerber (0 Comments) Cray will install a next-generation supercomputer...

232

Model and Seismic Analysis of Large-scale Wind Turbine Tower Structure  

Science Conference Proceedings (OSTI)

The working condition of wind turbine tower structure with a massive engine room and revolving wind wheels is very complex. The paper simplify the wind turbine tower model with finite element analysis software --ANSYS, completed modal analysis firstly, ... Keywords: wind turbine tower, model analysis, resonance, time-history analysis, dynamic

Xiang Liu; Jiangtao Kong

2012-05-01T23:59:59.000Z

233

Radiometric Modeling of Mechanical Draft Cooling Towers to Assist in the Extraction of their Absolute Temperature  

E-Print Network (OSTI)

Radiometric Modeling of Mechanical Draft Cooling Towers to Assist in the Extraction CENTER FOR IMAGING SCIENCE Title of Dissertation: Radiometric Modeling of Mechanical Draft Cooling Towers of Mechanical Draft Cooling Towers to Assist in the Extraction of their Absolute Temperature from Remote Thermal

Salvaggio, Carl

234

Ilchmann, Achim; Pahl, M. : Adaptive Multivariable pH Regulation of a Biogas Tower Reactor  

E-Print Network (OSTI)

Ilchmann, Achim; Pahl, M. : Adaptive Multivariable pH Regulation of a Biogas Tower Reactor Zuerst. The adaptive controller was successlullytesteclover il pcriod of tu'o nonths at a biogas tower reuetoriu pilot are not applicable to the biogas tower reĂĽctor.since a dontinatingf-eatureof the new reactol' prir-rciplc-is its

Knobloch,JĂĽrgen

235

URANIUM MILL TAILINGS RADON FLUX CALCULATIONS  

E-Print Network (OSTI)

URANIUM MILL TAILINGS RADON FLUX CALCULATIONS PIĂ?ON RIDGE PROJECT MONTROSE COUNTY, COLORADO (EFRC) proposes to license, construct, and operate a conventional acid leach uranium and vanadium mill storage pad, and access roads. The mill is designed to process ore containing uranium and vanadium

236

Installation and Commissioning Automated Demand Response Systems  

E-Print Network (OSTI)

al: Installation and Commissioning Automated Demand ResponseConference on Building Commissioning: April 22 – 24, 2008al: Installation and Commissioning Automated Demand Response

Kiliccote, Sila; Global Energy Partners; Pacific Gas and Electric Company

2008-01-01T23:59:59.000Z

237

Brand Font Installation Guide Windows XP  

E-Print Network (OSTI)

Brand Font Installation Guide Windows XP Before starting ­ make sure to the specific font folder ­ when Windows detects installable font files, they will show

Stuart, Steven J.

238

Numerical investigation of the grinding process in a Beater Wheel mill with classifier  

SciTech Connect

A numerical investigation is presented for a two-dimensional simulation of the gas flow field and of the dynamic behavior of lignite particles inside Beater Wheel mills with classifier, installed in large coal-fired plants. A large number of representative particles are tracked using Lagrangian equations of motion, in combination with a stochastic model for particle turbulent dispersion. All the important mechanisms associated with the particle motion through the mill (particle-surface collisions and rebounding phenomena, fuel moisture evaporation and erosion wear of internal surfaces) are modeled. A special model is constructed to simulate the fragmentation of impacting particles and to calculate the size distribution of the final mill product. The models are regulated on the basis of available data from grinding mills of the Greek lignite power stations. The numerical code is capable of predicting the locations of significant erosion and to estimate the amount of particle mass that circulates through the mill via the classifying chamber. Mean impact velocity and impingement angle distributions along all the internal surfaces are also provided. The results indicate remarkable differences in the extent of the erosion caused at different locations of the mill. Also, the significant role of the leading blades arrangement inside the classifier on its classification performance and efficiency is elucidated.

Anagnostopoulos, J.; Bergeles, G. [National Technical Univ. of Athens (Greece)

1997-07-01T23:59:59.000Z

239

Theoretical analysis of natural-convection towers for solar-energy conversion  

DOE Green Energy (OSTI)

A theoretical study of solar-powered natural convection tower (chimney) performance is presented. Both heated and cooled towers are analyzed, the latter using evaporating water as the cooling mechanism. The results, which are applicable to any open-cycle configuration, show that the ideal conversion efficiencies of both heated and cooled natural convection towers are linear functions of height. The performance of a heated tower in an adiabatic atmospheric ideally approaches the Carnot efficiency limit of approx. 3.4%/km(1.0%/1000 ft). Including water pumping requirements, the ideal limit to cooled tower performance is approx. 2.75%/km(0.85%/1000 ft). Ambient atmospheric conditions such as vertical temperature gradient (lapse rate) and relative humidity can have significantly adverse effects on natural convection tower performance. The combined effects of lapse rate and ambient relative humidity are especially important for cooled natural convection towers.

Lasier, D.D.; Jacobs, E.W.

1983-05-01T23:59:59.000Z

240

Computer Simulation of Cooling Effect of Wind Tower on Passively Ventilated Building  

E-Print Network (OSTI)

Traditional buildings are cooled and ventilated by mechanically induced drafts. Natural ventilation aspires to cool and ventilate a building by natural means, such as cross ventilation or wind towers, without mechanical equipment. A simple computer program was developed to simulate airflow through a wind tower based on tower dimensions and air temperature. The program was compared to experimental results with reasonable agreement. Parametric analysis indicates that interior air temperature approaches outdoor air temperature asymptotically as tower height and cross-sectional area are increased, and that it may be more cost effective to increase the tower?s height than its cross sectional area. The program was then used to simulate hour-by-hour indoor air temperatures of an occupied auditorium in Dayton, OH. The results indicate that a large wind tower was able to keep the temperature of an occupied auditorium at a comfortable level year round.

Seryak, J.; Kissock, J. K.

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Generator Bushing Installation and Maintenance Guide  

Science Conference Proceedings (OSTI)

This report is a comprehensive guide to generator high-voltage bushing (HVB) installation and maintenance.

2008-12-04T23:59:59.000Z

242

Process Improvement at Army Installations  

E-Print Network (OSTI)

Compliance with environmental law is becoming significantly expensive. In the past for convenience of management, compliance and pollution prevention were considered independently from production. Environmental law was introduced to optimize production methods to reduce pollution. Energy conservation opportunities (ECOs) that enhance pollution prevention have been compiled through research at many installations, including United States Army Construction Engineering Research Laboratories (USACERL). Executive Orders require the Army to reduce the use of energy and related environmental impacts by promoting renewable energy technologies. These new energy and environmental directives usually exceed the performance capabilities of DODs currently installed industrial technologies. The majority of DOD industrial activities utilize 40 year-old technologies and facilities. The objective of this project was to conduct a Level II process optimization audit on a munitions manufacturing operation at an Army base to optimize capacity, and energy and environmental performance. This paper reports the outcome and offers insights into process optimization.

Northrup, J.; Smith, E. D.; Lin, M.; Baird, J.

1997-04-01T23:59:59.000Z

243

Tower City, North Dakota: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Tower City, North Dakota: Energy Resources Tower City, North Dakota: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 46.9227548°, -97.6739889° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.9227548,"lon":-97.6739889,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

244

No Chemical, Zero Bleed Cooling Tower Water Treatment Process  

E-Print Network (OSTI)

This paper describes a process to treat cooling tower water by means of a fully automated and chemical free mechanical water treatment process. This is an alternative to conventional chemical treatment. Beginning with a suction pump to draw water out of the tower sump, water goes through a permanent magnetic descaler to increase the water solubility and begin the scale inhibition process. This also descales existing scale build-up in the system. Ozone is manufactured from ambient air and injected into the bypass system through a venturi type injector. This kills algae, slime and bacteria and enhances the magnetic descaling process. The final stage filter separates solids from the water to prevent corrosion from impingement. These solids are automatically purged to the sanitary drain. Clarified water is returned to the sump where the process repeats on a 10%-20% by volume side stream basis.

Coke, A. L.

1992-04-01T23:59:59.000Z

245

Advanced Lighting Controls - My Venture from the Ivory Tower  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Lighting Controls - My Venture from the Ivory Tower Advanced Lighting Controls - My Venture from the Ivory Tower Speaker(s): Charlie Huizenga Date: June 15, 2012 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Dragan Charlie Curcija Lighting energy represents 30-40% of commercial building electricity consumption, yet very few buildings have advanced lighting controls. The potential energy savings are tremendous as is the opportunity to reduce demand on the grid during critical peak use periods. Charlie will describe how low-cost wireless radio technology developed at UC Berkeley and commercialized by Adura Technologies is creating a paradigm shift in the way we think about controlling lighting. Beyond deep energy savings and demand response, the technology offers personal control for occupants and

246

CFD MODELING ANALYSIS OF MECHANICAL DRAFT COOLING TOWER  

Science Conference Proceedings (OSTI)

Industrial processes use mechanical draft cooling towers (MDCT's) to dissipate waste heat by transferring heat from water to air via evaporative cooling, which causes air humidification. The Savannah River Site (SRS) has a MDCT consisting of four independent compartments called cells. Each cell has its own fan to help maximize heat transfer between ambient air and circulated water. The primary objective of the work is to conduct a parametric study for cooling tower performance under different fan speeds and ambient air conditions. The Savannah River National Laboratory (SRNL) developed a computational fluid dynamics (CFD) model to achieve the objective. The model uses three-dimensional steady-state momentum, continuity equations, air-vapor species balance equation, and two-equation turbulence as the basic governing equations. It was assumed that vapor phase is always transported by the continuous air phase with no slip velocity. In this case, water droplet component was considered as discrete phase for the interfacial heat and mass transfer via Lagrangian approach. Thus, the air-vapor mixture model with discrete water droplet phase is used for the analysis. A series of the modeling calculations was performed to investigate the impact of ambient and operating conditions on the thermal performance of the cooling tower when fans were operating and when they were turned off. The model was benchmarked against the literature data and the SRS test results for key parameters such as air temperature and humidity at the tower exit and water temperature for given ambient conditions. Detailed results will be presented here.

Lee, S; Alfred Garrett, A; James02 Bollinger, J; Larry Koffman, L

2008-03-03T23:59:59.000Z

247

2011 CERN Waste Heat EN-CV February 28th 2011 Power Dissipated by the Cooling Towers  

E-Print Network (OSTI)

2011 CERN Waste Heat EN-CV February 28th 2012 1 2011 Power Dissipated by the Cooling Towers The cooling circuits at CERN use evaporative open cooling towers to discharge into the atmosphere the heat towers per complex depend on the amount of cooling power required. LHC one cooling tower per even LHC

Wu, Sau Lan

248

Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project  

SciTech Connect

This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.

Bachrach, A.; Hoopes, J.; Morycz, D. (Jacobs Engineering Group, Inc., Pasadena, CA (USA)); Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P. (Weston (Roy F.), Inc., Washington, DC (USA)); Rice, G. (Sergent, Hauskins and Beckwith (USA))

1984-12-01T23:59:59.000Z

249

Effect of cyclone assisted milling on legume flour characteristics and functionality in selected food products.  

E-Print Network (OSTI)

??Legumes (cowpea and soybean) were milled using a cyclone-assisted attrition mill to produce fine legume flour. Milling variations consisted of alterations in mill design and… (more)

Jarrard, Mark, Jr.

2006-01-01T23:59:59.000Z

250

Online SAG Mill Pluse Measurement and Optimization  

SciTech Connect

The grinding efficiency of semi autogenous milling or ball milling depends on the tumbling motion of the total charge within the mill. Utilization of this tumbling motion for efficient breakage of particles depends on the conditions inside the mill. However, any kind of monitoring device to measure the conditions inside the mill shell during operation is virtually impossible due to the severe environment presented by the tumbling charge. An instrumented grinding ball, which is capable of surviving a few hours and transmitting the impacts it experiences, is proposed here. The spectrum of impacts collected over 100 revolutions of the mills presents the signature of the grinding environment inside mill. This signature could be effectively used to optimize the milling performance by investigating this signature's relation to mill product size, mill throughput, make-up ball size, mill speed, liner profile and ball addition rates. At the same time, it can also be used to design balls and liner systems that can survive longer in the mill. The technological advances made in electronics and communication makes this leap in instrumentation certainly viable. Hence, the instrumented grinding ball offers the ability to qualitatively observe and optimize the milling environment. An instrumented load cell package that can measure the force of impacts inside the grinding chamber of a mill is developed here. The signal from the instrumented load cell package is interpreted in terms of a histogram termed as an impact spectrum which is a plot of the number of impacts at a specific energy level against the energy. It reflects on the average force regime of the mill. The instrumented load cell package was calibrated against the ultra fast load cell which has been unanimously accepted as a standard to measure single breakage events. The load cell package was successfully used to produce impact spectra in an 8.5 inch lab scale mill. The mill speed and the ball size were varied to study their effect on the impact spectra. A good correlation was found between the process variables and the impact spectra. The load cell package was then used in a 16 inch pilot scale mill. The mill speed, ball size, and mill filling were varied here and a consistent trend between these variables and impact spectra was observed. With a better understanding developed from the initial tests, the design of the load cell package was significantly changed to eliminate noise. With the new design, the impact spectra were re-determined in the 16 inch pilot mill varying the process variables - ball size, mill speed, and mill filling. Finally, it is successfully shown that a change in the operating variables of a mill can be seen in the impact spectra and that this concept can be successfully developed to monitor the grinding operation of industrial mills. To adapt it to industrial level it is mandatory to make the load cell package wireless. A design of a wireless circuit that is capable of transferring data at the required speed of 1000 kbps was also developed and tested at Cortez Gold Mines (CGM), Nevada.

Raj Rajamani; Jose Delgadillo; Vishal Duriseti

2007-06-30T23:59:59.000Z

251

High Flux Isotopes Reactor (HFIR) Cooling Towers Demolition Waste Management  

SciTech Connect

This paper describes the results of a joint initiative between Oak Ridge National Laboratory, operated by UT-Battelle, and Bechtel Jacobs Company, LLC (BJC) to characterize, package, transport, treat, and dispose of demolition waste from the High Flux Isotope Reactor (HFIR), Cooling Tower. The demolition and removal of waste from the site was the first critical step in the planned HFIR beryllium reflector replacement outage scheduled. The outage was scheduled to last a maximum of six months. Demolition and removal of the waste was critical because a new tower was to be constructed over the old concrete water basin. A detailed sampling and analysis plan was developed to characterize the hazardous and radiological constituents of the components of the Cooling Tower. Analyses were performed for Resource Conservation and Recovery Act (RCRA) heavy metals and semi-volatile constituents as defined by 40 CFR 261 and radiological parameters including gross alpha, gross beta, gross gamma, alpha-emitting isotopes and beta-emitting isotopes. Analysis of metals and semi-volatile constituents indicated no exceedances of regulatory limits. Analysis of radionuclides identified uranium and thorium and associated daughters. In addition 60Co, 99Tc, 226Rm, and 228Rm were identified. Most of the tower materials were determined to be low level radioactive waste. A small quantity was determined not to be radioactive, or could be decontaminated. The tower was dismantled October 2000 to January 2001 using a detailed step-by-step process to aid waste segregation and container loading. The volume of waste as packaged for treatment was approximately 1982 cubic meters (70,000 cubic feet). This volume was comprised of plastic ({approx}47%), wood ({approx}38%) and asbestos transite ({approx}14%). The remaining {approx}1% consisted of the fire protection piping (contaminated with lead-based paint) and incidental metal from conduit, nails and braces/supports, and sludge from the basin. The waste, except for the asbestos, was volume reduced via a private contract mechanism established by BJC. After volume reduction, the waste was packaged for rail shipment. This large waste management project successfully met cost and schedule goals.

Pudelek, R. E.; Gilbert, W. C.

2002-02-26T23:59:59.000Z

252

SunShot Initiative: Installation and Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Installation and Performance to Installation and Performance to someone by E-mail Share SunShot Initiative: Installation and Performance on Facebook Tweet about SunShot Initiative: Installation and Performance on Twitter Bookmark SunShot Initiative: Installation and Performance on Google Bookmark SunShot Initiative: Installation and Performance on Delicious Rank SunShot Initiative: Installation and Performance on Digg Find More places to share SunShot Initiative: Installation and Performance on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Balance of Systems Reducing Non-Hardware Costs Lowering Barriers Fostering Growth Installation and Performance Photo of a group of men moving a rectangular solar panel. Energy Secretary Steven Chu watches members of the Solar Instructor

253

Uranium mill monitoring for natural fission reactors  

SciTech Connect

Isotopic monitoring of the product stream from operating uranium mills is proposed for discovering other possible natural fission reactors; aspects of their occurrence and discovery are considered. Uranium mill operating characteristics are formulated in terms of the total uranium capacity, the uranium throughput, and the dilution half-time of the mill. The requirements for detection of milled reactor-zone uranium are expressed in terms of the dilution half-time and the sampling frequency. Detection of different amounts of reactor ore with varying degrees of /sup 235/U depletion is considered.

Apt, K.E.

1977-12-01T23:59:59.000Z

254

Wet Corn Milling Plant EPI | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Wet Corn Milling Plant EPI Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction...

255

The Bowersock Mills and Power Company 1874  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydroelectric Energy The Bowersock Mills and Power Co., Lawrence, KS Hydroelectric Energy Potential for U.S. BMPC Plant At Forefront of Development Curve "In our estimates...

256

Report on Preliminary Engineering Study for Installation of an Air Cooled Steam Condenser at Brawley Geothermal Plant, Unit No. 1  

SciTech Connect

The Brawley Geothermal Project comprises a single 10 MW nominal geothermal steam turbine-generator unit which has been constructed and operated by the Southern California Edison Company (SCE). Geothermal steam for the unit is supplied through contract by Union Oil Company which requires the return of all condensate. Irrigation District (IID) purchases the electric power generated and provides irrigation water for cooling tower make-up to the plant for the first-five years of operation, commencing mid-1980. Because of the unavailability of irrigation water from IID in the future, SCE is investigating the application and installation of air cooled heat exchangers in conjunction with the existing wet (evaporative) cooling tower with make-up based on use of 180 gpm (nominal) of the geothermal condensate which may be made available by the steam supplier.

1982-03-01T23:59:59.000Z

257

AIR LEAKAGE OF NEWLY INSTALLED RESIDENTIAL WINDOWS  

E-Print Network (OSTI)

Through Sash/Frame Cracks . Window Operation Types . . . . .Window Operation Types . . . . .Air Leakage of Installed Windows Scattergram of Field

Weidt, John

2013-01-01T23:59:59.000Z

258

Hybrid Tower Study: Volume 3: Phase 3 -- Scale Model Development and Full-Scale Tests  

Science Conference Proceedings (OSTI)

Hybrid towers maximize the power transmission efficiency of the available space whenever there is the need to have both ac and dc lines in the same corridor. This study developed calculation techniques and design rules for the placement of conductors energized with HVAC and HVDC circuits on the same towers. Significantly, the study did not identify any hybrid interactions that would prevent the successful operation of a hybrid corridor or hybrid tower transmission line.

1994-06-29T23:59:59.000Z

259

Surface and Tower Meteorological Instrumentation at Atqasuk (METTWR2H) Handbook  

SciTech Connect

The Atqasuk meteorology station (AMET) uses mainly conventional in situ sensors to measure wind speed, wind direction, air temperature, dew point, and humidity mounted on a 10-m tower. It also obtains barometric pressure, visibility and precipitation data from sensors at or near the base of the tower. In addition, a chilled mirror hygrometer (CMH) is located at 1 m for comparison purposes. Temperature and relative humidity (RH) probes are mounted at 2 m and 5 m on the tower.

Ritsche, MT

2006-01-01T23:59:59.000Z

260

A Milling-Implement Quarry at Elephant Mountain, California  

E-Print Network (OSTI)

pp. 191-221 (1995). A Milling-Implement Quarry at Elephantwere shaped into aboriginal milling stones and pestles andin the Mojave River region. The milling-implement quarry at

Schneider, Joan S; Lerch, Michael K; Smith, Gerald A

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Two Milling Stone Inventories from Northern San Diego County, California  

E-Print Network (OSTI)

2, pp. 233-261 (1982). Two Milling Stone Inventories from5. Manos from Rincon 301. MILLING STONE INVENTORIES FROM SANd-e) from Rincon 301. MILLING STONE INVENTORIES FROM SAN

True, D. L; Beemer, Eleanor

1982-01-01T23:59:59.000Z

262

Virtual cutter path display for dental milling machine  

E-Print Network (OSTI)

This paper presents the prototype of a mixed reality system using the computer controlled dental milling machine, which is called MRD Mill. First, overview of the core dental milling machine developed in this study is ...

Ito, Teruaki

263

Design of Light Weight Structure for Wind Turbine Tower by Using ...  

Science Conference Proceedings (OSTI)

This paper reports a new design scheme of light weight structure for wind turbine tower. This design scheme is based on the integration of the nano-structured ...

264

An investigation of design alternatives for 328-ft (100-m) tall wind turbine towers.  

E-Print Network (OSTI)

??As wind turbines are continued to be placed at higher elevations, the need for taller wind turbine towers becomes necessary. However, there are multiple challenges… (more)

Lewin, Thomas James

2010-01-01T23:59:59.000Z

265

RECIPIENT:Desert Research Institute STATE:NV PROJECT Tall Tower...  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Institute STATE:NV PROJECT Tall Tower Wind Energy Monitoring and Numerical Model Validation in Southern Nevada; NREl Tracking TITLE: No. 11-012 Funding Opportunity...

266

Enhancement of CN Tower lightning current derivative signals using a modified power spectral subtraction method.  

E-Print Network (OSTI)

??Lightning current measurements are possible using instrumental tall structures or rocket-triggered lightning. The CN Tower has been a source of lightning current data for the… (more)

Mehmud, Huma

2006-01-01T23:59:59.000Z

267

Flux Measurements of Volatile Organic Compounds from an Urban Tower Platform.  

E-Print Network (OSTI)

??A tall tower flux measurement setup was established in metropolitan Houston, Texas, to measure trace gas fluxes from both anthropogenic and biogenic emission sources in… (more)

Park, Chang Hyoun

2011-01-01T23:59:59.000Z

268

Performance analysis of heat transfer processes from wet and dry surfaces : cooling towers and heat exchangers.  

E-Print Network (OSTI)

??The objective of this work is to study the thermal and hydraulic performance of evaporatively cooled heat exchangers, including closed wet cooling towers, and dry… (more)

Hasan, Ala Ali

2005-01-01T23:59:59.000Z

269

Numerical modelling of heat and mass transfer and optimisation of a natural draft wet cooling tower.  

E-Print Network (OSTI)

??The main contribution of this work is to answer several important questions relating to natural draft wet cooling tower (NDWCT) modelling, design and optimisation. Specifically,… (more)

Williamson, Nicholas J

2007-01-01T23:59:59.000Z

270

Performance Analysis of Heat Transfer Processes from Wet and Dry Surfaces: Cooling Towers and Heat Exchangers.  

E-Print Network (OSTI)

??The objective of this work is to study the thermal and hydraulic performance of evaporatively cooled heat exchangers, including closed wet cooling towers, and dry… (more)

Hasan, Ala Ali

2005-01-01T23:59:59.000Z

271

Clean Air Act Requirements: Uranium Mill Tailings  

E-Print Network (OSTI)

EPA'S Clean Air Act Requirements: Uranium Mill Tailings Radon Emissions Rulemaking Reid J. Rosnick Presentation to Environmental Protection Agency Uranium Contamination Radiation Protection Division (6608J requirements for operating uranium mill tailings (Subpart W) Status update on Subpart W activities Outreach

272

Environmental Assessment Kotzebue Wind Installation Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment \ Kotzebue Wind Installation Project Kotzebue, Alaska U. S. Department of Energy Golden Field Office 16 17 Cole Boulevard Golden, Colorado May 1998 Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska U. S . Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado May 1998 Finding of No Significant Impact Environmental Assessment Kotzebue Wind Installation Project Kotzebue, Alaska F'INDING OF NO SIGNIFICANT IMPACT for KOTZEBUE WIND INSTALLATION PROJECT KOTZEBUE, ALASKA AGENCY: Department of Energy, Golden Field Office ACTION: Finding of No Significant Impact SUMMARY: The DOE is proposing to provide financial .assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska.

273

NanoFab Tool: 4Wave Ion Milling System  

Science Conference Proceedings (OSTI)

... 4Wave Ion Milling System. CORAL Name: Ion Mill. Location: Building 215 (NanoFab Clean Room Bay A106). Description: ...

2010-10-13T23:59:59.000Z

274

Tamil Nadu Spinning Mills Association TASMA | Open Energy Information  

Open Energy Info (EERE)

search Name Tamil Nadu Spinning Mills Association (TASMA) Place Dindigul, Tamil Nadu, India Zip 624003 Sector Wind energy Product Association of spinning mill owners; promoting...

275

Mill Seat Landfill Bioreactor Renewable Green Power (NY)  

Science Conference Proceedings (OSTI)

The project was implemented at the Mill Seat landfill located in the Town of Bergen, Monroe County, New York. The landfill was previously equipped with a landfill gas collection system to collect methane gas produced by the bioreactor landfill and transport it to a central location for end use. A landfill gas to energy facility was also previously constructed at the site, which utilized generator engines, designed to be powered with landfill methane gas, to produce electricity, to be utilized on site and to be sold to the utility grid. The landfill gas generation rate at the site had exceeded the capacity of the existing generators, and the excess landfill gas was therefore being burned at a candlestick flare for destruction. The funded project consisted of the procurement and installation of two (2) additional 800 KW Caterpillar 3516 generator engines, generator sets, switchgear and ancillary equipment.

Barton & Loguidice, P.C.

2010-01-07T23:59:59.000Z

276

1980 Active-Solar Installations Survey  

SciTech Connect

The survey covers active solar installations made during and prior to calendar year 1980. As the first survey of active solar installations in the United States, the objective was to establish a national baseline information system that could provide current data on residential and commercial active solar installations as well as a listing of firms involved in the active solar industry, including installers. Potential respondents were identified from regional lists of solar equipment dealers and installers compiled by each Regional Solar Energy Center (RSEC). The RSEC lists were computerized and combined into a mailing list of 5466 company names and addresses. An additional 1619 referrals, were provided by survey respondents from the RSEC list. However, because of resource constraints, 981 of these referrals were not included in the survey. To substantiate that the results of this survey represent accurate statistics on the number of active solar installations in the United States, a comparison was made to the Solar Collector Manufacturing Survey installations. (PSB)

1982-10-01T23:59:59.000Z

277

A Regenerative High-Rise Tower in Shreveport, Louisiana  

E-Print Network (OSTI)

Zero Net Energy Buildings are increasingly being designed and constructed in response to the demand for sustainable buildings. But, we must now go beyond merely sustaining our environment for future generations we must provide regenerative designs that restore our natural environment. This paper will document the design of a regenerative high-rise tower in Shreveport, Louisiana, which will serve as a facility to train individuals in a non-profit organization’s renewal strategies and demonstrate by example the pedagogy of regenerative design. The 16-story structure — built in the 1950s and named the Petroleum Tower, reflecting the commodity that then ruled the local economy — was vacant and asbestos-laden when given to the non-profit Community Renewal International (CRI) in 2001. In 2006, funded by a grant from the U.S. Environmental Protection Agency, workers removed the asbestos. Through a follow up grant from the U.S. Department of Energy to support the design process of a new CRI headquarters building, the University of Texas at Austin School of Architecture completed architectural design studies for the building renewal. The principles of this new design include: day lighting, envelope configuration, building integrated photovoltaic systems, green surfaces, ventilation strategies, advanced mechanical cooling systems, regenerative elevator systems, energy management systems, water harvesting, grey water systems, trigeneration systems and a combined heating, hot water and power biodiesel plant.

Garrison, M.

2010-08-01T23:59:59.000Z

278

ON THE STRUCTURE AND STABILITY OF MAGNETIC TOWER JETS  

SciTech Connect

Modern theoretical models of astrophysical jets combine accretion, rotation, and magnetic fields to launch and collimate supersonic flows from a central source. Near the source, magnetic field strengths must be large enough to collimate the jet requiring that the Poynting flux exceeds the kinetic energy flux. The extent to which the Poynting flux dominates kinetic energy flux at large distances from the engine distinguishes two classes of models. In magneto-centrifugal launch models, magnetic fields dominate only at scales {approx}< 100 engine radii, after which the jets become hydrodynamically dominated (HD). By contrast, in Poynting flux dominated (PFD) magnetic tower models, the field dominates even out to much larger scales. To compare the large distance propagation differences of these two paradigms, we perform three-dimensional ideal magnetohydrodynamic adaptive mesh refinement simulations of both HD and PFD stellar jets formed via the same energy flux. We also compare how thermal energy losses and rotation of the jet base affects the stability in these jets. For the conditions described, we show that PFD and HD exhibit observationally distinguishable features: PFD jets are lighter, slower, and less stable than HD jets. Unlike HD jets, PFD jets develop current-driven instabilities that are exacerbated as cooling and rotation increase, resulting in jets that are clumpier than those in the HD limit. Our PFD jet simulations also resemble the magnetic towers that have been recently created in laboratory astrophysical jet experiments.

Huarte-Espinosa, M.; Frank, A.; Blackman, E. G. [Department of Physics and Astronomy, University of Rochester, 600 Wilson Boulevard, Rochester, NY 14627-0171 (United States); Ciardi, A. [LERMA, Universite Pierre et Marie Curie, Observatoire de Paris, F-92195 Meudon (France); Hartigan, P. [Department of Physics and Astronomy, Rice University, 6100 S. Main, Houston, TX 77521-1892 (United States); Lebedev, S. V.; Chittenden, J. P. [Blackett Laboratory, Imperial College London, SW7 2BW London (United Kingdom)

2012-09-20T23:59:59.000Z

279

Coagulation chemistries for silica removal from cooling tower water.  

SciTech Connect

The formation of silica scale is a problem for thermoelectric power generating facilities, and this study investigated the potential for removal of silica by means of chemical coagulation from source water before it is subjected to mineral concentration in cooling towers. In Phase I, a screening of many typical as well as novel coagulants was carried out using concentrated cooling tower water, with and without flocculation aids, at concentrations typical for water purification with limited results. In Phase II, it was decided that treatment of source or make up water was more appropriate, and that higher dosing with coagulants delivered promising results. In fact, the less exotic coagulants proved to be more efficacious for reasons not yet fully determined. Some analysis was made of the molecular nature of the precipitated floc, which may aid in process improvements. In Phase III, more detailed study of process conditions for aluminum chloride coagulation was undertaken. Lime-soda water softening and the precipitation of magnesium hydroxide were shown to be too limited in terms of effectiveness, speed, and energy consumption to be considered further for the present application. In Phase IV, sodium aluminate emerged as an effective coagulant for silica, and the most attractive of those tested to date because of its availability, ease of use, and low requirement for additional chemicals. Some process optimization was performed for coagulant concentration and operational pH. It is concluded that silica coagulation with simple aluminum-based agents is effective, simple, and compatible with other industrial processes.

Nyman, May Devan; Altman, Susan Jeanne; Stewart, Tom

2010-02-01T23:59:59.000Z

280

FLUX MEASUREMENTS FROM A TALL TOWER IN A COMPLEX LANDSCAPE  

Science Conference Proceedings (OSTI)

The accuracy and representativeness of flux measurements from a tall tower in a complex landscape was assessed by examining the vertical and sector variability of the ratio of wind speed to momentum flux and the ratio of vertical advective to eddy flux of heat. The 30-60 m ratios were consistent with theoretical predictions which indicate well mixed flux footprints. Some variation with sector was observed that were consistent with upstream roughness. Vertical advection was negligible compared with vertical flux except for a few sectors at night. This implies minor influence from internal boundary layers. Flux accuracy is a function of sector and stability but 30-60 m fluxes were found to be generally representative of the surrounding landscape. This paper will study flux data from a 300 m tower, with 4 levels of instruments, in a complex landscape. The surrounding landscape will be characterized in terms of the variation in the ratio of mean wind speed to momentum flux as a function of height and wind direction. The importance of local advection will be assessed by comparing vertical advection with eddy fluxes for momentum and heat.

Kurzeja, R.; Weber, A.; Chiswell, S.; Parker, M.

2010-07-22T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Wet Corn Milling Energy Guide  

NLE Websites -- All DOE Office Websites (Extended Search)

307 307 ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY Energy Efficiency Improvement and Cost Saving Opportunities for the Corn Wet Milling Industry An ENERGY STAR Guide for Energy and Plant Managers Christina Galitsky, Ernst Worrell and Michael Ruth Environmental Energy Technologies Division Sponsored by the U.S. Environmental Protection Agency July 2003 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product,

282

Research for the Crane Boom Length Coefficient Considering the Tower Head Flexibility in Rotary Plane  

Science Conference Proceedings (OSTI)

When the crane boom length in rotary plane is determined, the traditional methods only consider support condition, non-uniform, boom end lateral displacement constraint effect of amplitude dragline and hoist rope tensile forces. Ignoring tower head elastic ... Keywords: Equivalent elastic support method, Rotary plane, Tower head flexibility, Non-conservative loading, Length coefficient

Zhang Guangyun; Lan Peng; Lu Nianli

2011-01-01T23:59:59.000Z

283

Nuclear Maintenance Applications Center: Guideline for Cooling Tower Inspection and Maintenance  

Science Conference Proceedings (OSTI)

Cooling tower structural failures have recently become a focus area for the nuclear industry based on events that have resulted in lost generation as well as high repair costs. Environmental concerns regarding thermal pollution and water usage have also recently increased the need for guidance for cooling tower inspection and maintenance.

2011-06-06T23:59:59.000Z

284

Solar Two: A Molten Salt Power Tower Demonstration* Craig E.Tyner  

E-Print Network (OSTI)

Solar Two: A Molten Salt Power Tower Demonstration* Craig E.Tyner Sandia National Laboratories.S. Department of Energy (DOE),Sandia National Laboratories, and industry to convert the 10-MwSolar One Power, is $48.5 million. The plant will begin operation in early 1996. Introduction A solar power tower plant

Laughlin, Robert B.

285

Method and system for simulating heat and mass transfer in cooling towers  

DOE Patents (OSTI)

The present invention is a system and method for simulating the performance of a cooling tower. More precisely, the simulator of the present invention predicts values related to the heat and mass transfer from a liquid (e.g., water) to a gas (e.g., air) when provided with input data related to a cooling tower design. In particular, the simulator accepts input data regarding: (a) cooling tower site environmental characteristics; (b) cooling tower operational characteristics; and (c) geometric characteristics of the packing used to increase the surface area within the cooling tower upon which the heat and mass transfer interactions occur. In providing such performance predictions, the simulator performs computations related to the physics of heat and mass transfer within the packing. Thus, instead of relying solely on trial and error wherein various packing geometries are tested during construction of the cooling tower, the packing geometries for a proposed cooling tower can be simulated for use in selecting a desired packing geometry for the cooling tower.

Bharathan, Desikan (Lakewood, CO); Hassani, A. Vahab (Golden, CO)

1997-01-01T23:59:59.000Z

286

Cooling-Tower Performance Prediction and Improvement: Volumes 1 and 2  

Science Conference Proceedings (OSTI)

New data and methods enable engineers to predict and improve the thermal performance of evaporative cooling towers. Current EPRI research focuses on analytic tools that will help utilities avoid costly operating penalties associated with cooling towers that do not meet thermal performance specifications.

1989-12-01T23:59:59.000Z

287

UT tower goes dark to conserve energy by KVUE.com  

E-Print Network (OSTI)

UT tower goes dark to conserve energy by KVUE.com Posted on November 22, 2013 at 5:12 PM Updated, but the first time the tower turned off its lights for the initiative. In previous initiatives, the UT Energy) assisted with turning off lights and electronics across campus to conserve energy. While the clock faces

288

Acoustic Imaging Evaluation of Juvenile Salmonid Behavior in the Immediate Forebay of the Water Temperature Control Tower at Cougar Dam, 2010  

Science Conference Proceedings (OSTI)

This report presents the results of an evaluation of juvenile Chinook salmon (Oncorhynchus tshawytscha) behavior at Cougar Dam on the south fork of the McKenzie River in Oregon in 2010. The study was conducted by the Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers (USACE). The overall goal of the study was to characterize juvenile salmonid behavior and movement patterns in the immediate forebay of the Water Temperature Control (WTC) tower of the dam for USACE and fisheries resource managers use in making decisions about bioengineering designs for long-term structures and/or operations to facilitate safe downstream passage for juvenile salmonids. We collected acoustic imaging (Dual-Frequency Identification Sonar; DIDSON) data from March 1, 2010, through January 31, 2011. Juvenile salmonids (hereafter, called 'fish') were present in the immediate forebay of the WTC tower throughout the study. Fish abundance index was low in early spring (fish per sample-day), increased in late April, and peaked on May 19 (6,039 fish). A second peak was observed on June 6 (2904 fish). Fish abundance index decreased in early June and remained low in the summer months (fish per sample-day). During the fall and winter, fish numbers varied with a peak on November 10 (1881 fish) and a minimum on December 7 (12 fish). A second, smaller, peak occurred on December 22 (607 fish). A univariate statistical analysis indicated fish abundance index (log10-transformed) was significantly (Pfish abundance (log-transformed index values) using two independent variables of mean forebay elevation and the log10 of the forebay elevation range. From the approximate fish length measurements made using the DIDSON imaging software, the average fish length during early spring 2010 was 214 {+-} 86 mm (standard deviation). From May through early November, the average fish length remained relatively consistent (132 {+-} 54 mm), after which average lengths increased to 295 {+-} 148 mm for mid-November though early December. From mid-December through January the average fish length decreased to 151 {+-} 76 mm. Milling in front of the WTC tower was the most common fish behavior observed throughout the study period. Traversing along the front of the tower, east-to-west and west-to-east, was the next common behavior. The percentage of fish events showing movement from the forebay to the tower or from the tower to the forebay was generally low throughout the spring, summer, and early fall (0 to 30% for both directions combined, March through early November). From mid-November 2010 through the end of the study (January 31, 2011), the combined percentages of fish moving into and out of the tower were higher (25 to 70%) than during previous months of the study. Schooling behavior was most distinct in the spring. Schooling events were present in 30 to 96% of the fish events during that period, with a peak on May 19. Schooling events were also present in the summer, but at lower numbers. With the exception of some schooling in mid-December, few to no schooling events were observed in the fall and winter months. Diel distributions for schooling fish during spring and fall months indicate schooling was concentrated during daylight hours and no schooling was observed at night. However, in December, schooling occurred at night, after midnight, and during daylight hours. Predator activity, most likely bull trout or rainbow trout according to a USACE biologist, was observed during late spring, when fish abundance index and schooling were highest for the year, and again in the fall months when fish events increased from a summer low. No predator activity was observed in the summer, and little activity occurred during the winter months.

Khan, Fenton; Johnson, Gary E.; Royer, Ida M.; Phillips, Nathan RJ; Hughes, James S.; Fischer, Eric S.; Ham, Kenneth D.; Ploskey, Gene R.

2012-04-01T23:59:59.000Z

289

Verification of BModes: Rotary Beam and Tower Modal Analysis Code; Preprint  

DOE Green Energy (OSTI)

This paper describes verification of BModes, a finite-element code developed to provide coupled modes for the blades and tower of a wind turbine. The blades, which may be rotating or non-rotating, and the towers, whether onshore or offshore, are modeled using specialized 15-dof beam finite elements. Both blade and tower models allow a tip attachment, which is assumed to be rigid body with six moments of inertia, and a mass centroid that may be offset from the blade or tower axis. Examples of tip attachments are aerodynamic brakes for blades and nacelle-rotor subassembly for towers. BModes modeling allows for tower supports including tension wires, floating platforms, and monopiles on elastic foundations. Coupled modes (implying coupling of flap, lag, axial, and torsional motions) are required for modeling major flexible components in a modal-based, aeroelastic code such as FAST1. These are also required for validation of turbine models using experimental data, modal-based fatigue analysis, controls design, and understanding aeroelastic-stability behavior of turbines. Verification studies began with uniform tower models, with and without tip inertia, and progressed to realistic towers. For the floating turbine, we accounted for the effects of hydrodynamic inertia, hydrostatic restoring, and mooring lines stiffness. For the monopole-supported tower, we accounted for distributed hydrodynamic mass on the submerged part of the tower and for distributed foundation stiffness. Finally, we verified a model of a blade carrying tip mass and rotating at different speeds (verifications of other blade models, rotating or non-rotating, have been reported in another paper.) Verifications were performed by comparing BModes-generated modes with analytical results, if available, or with MSC.ADAMS results. All results in general show excellent agreement.

Bir, G.

2010-04-01T23:59:59.000Z

290

Departments of Energy, Defense Partner to Install Fuel Cell Backup...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Defense Partner to Install Fuel Cell Backup Power Units at Eight Military Installations Departments of Energy, Defense Partner to Install Fuel Cell Backup Power Units at...

291

Lightning and Surge Protection of Photovoltaic Installations  

Science Conference Proceedings (OSTI)

... installed at the site, for safety, surge protection ... the cells were described as "melted near the metallic ... horizontal distance from the nearest air terminal ...

2013-05-17T23:59:59.000Z

292

FLUDViz: Installation Instructions for UNIX Source  

Science Conference Proceedings (OSTI)

... details. launches a Tcl/Tk process for the control menu. Thus you need a Tcl/Tk implementation installed on your system. ...

293

WebCAT: Installation Instructions for Windows  

Science Conference Proceedings (OSTI)

... Requirements, WebCAT can be installed on Windows systems running IIS, PWS, or Apache web servers and on Unix systems running Apache. ...

294

NREL: Technology Transfer - Wind Technology Center Installing ...  

Wind Technology Center Installing a Dynamic Duo August 25, 2009. Generating 20 percent of the nation's electricity from clean wind resources will ...

295

Zoning for Small Wind: The Importance of Tower Height  

Wind Powering America (EERE)

1 1 Zoning for Small Wind: The Importance of Tower Height An ASES Small Wind Webinar Mick Sagrillo-Wisconsin's Focus on Energy © 2008 by Mick Sagrillo 2 Definitions: rotor L&S Tech. Assoc., Inc. Rotor = "collector" for a wind system 3 Definitions: wind * Wind = the 'fuel' * Wind has two 'components' - Quantity = wind speed (velocity or V) - Quality = 'clean' flowing wind 4 Quantity * = average annual wind speed * Climate, not weather * Akin to annual average sun hours for PV or head and flow for hydro * Wind speed increases with height above ground... * ...Due to diminished ground drag (friction) 5 Power in the wind V³ * Wind speed = V * Power available is proportional to wind speed x wind speed x wind speed - or P ~ V x V x V - or P ~ V ³ * Therefore, 10% V = 33% P * Lesson !

296

Energy (Cost) Savings by Zero Discharge in Cooling Towers  

E-Print Network (OSTI)

Maximum reuse of cooling tower blowdown by the incorporation of a sidestream softening system to recycle water can allow for significant savings in energy costs for industry. The system design parameters described in this paper are based upon calcium sulfate, calcium carbonate, and silica solubility equations for the resultant high ionic strength of a zero blowdown system. Operational aspects are highlighted in terms of deposition, corrosion, and biofouling potentials as well as currently-practiced, successful treatment procedures. The effects and history of corrosion and scale inhibitors, as well as other treatment chemicals, have been evaluated for numerous plants utilizing zero blowdown, and a summation of this knowledge is presented here. The cost analysis of conventional systems versus recycle systems is based upon a computer model's predictions for makeup waters of various qualities and costs.

Matson, J. V.; Gardiner, W. M.; Harris, T. G.; Puckorius, P. R.

1982-01-01T23:59:59.000Z

297

The evolution of magnetic tower jets in the laboratory  

E-Print Network (OSTI)

The evolution of laboratory produced magnetic jets is followed numerically through three-dimensional, non-ideal magnetohydrodynamic simulations. The experiments are designed to study the interaction of a purely toroidal field with an extended plasma background medium. The system is observed to evolve into a structure consisting of an approximately cylindrical magnetic cavity with an embedded magnetically confined jet on its axis. The supersonic expansion produces a shell of swept-up shocked plasma which surrounds and partially confines the magnetic tower. Currents initially flow along the walls of the cavity and in the jet but the development of current-driven instabilities leads to the disruption of the jet and a re-arrangement of the field and currents. The top of the cavity breaks-up and a well collimated, radiatively cooled, 'clumpy' jet emerges from the system.

A. Ciardi; S. V. Lebedev; A. Frank; E. G. Blackman; J. P. Chittenden; C. J. Jennings; D. J. Ampleford; S. N. Bland; S. C. Bott; J. Rapley; G. N. Hall; F. A. Suzuki-Vidal; A. Marocchino; T. Lery; C. Stehle

2006-11-14T23:59:59.000Z

298

Cooling Tower Energy Conservation Through Hydraulic Fan Drives  

E-Print Network (OSTI)

Many companies offer gearboxes, shafts, and couplings for cooling tower fan drives, with little or no innovation. These companies have traditionally been purchased with an emphasis on cost and not "Return on Investment!" In the past, when energy conservation or "Return on Investment" was emphasized, the only alternative was to add an expensive frequency inverter for variable speed control. This meant expensive rewiring, placing additional controls in an already crowded control room, or constructing a special building for them. However, with H.E.M.'s patented Hydraulic Fan Drive, one receives variable speed control and more efficiency for approximately the price of a mechanical drive. The new, more efficient Hydraulic Drive allows for a variable speed control and the ability to sense water temperature to control fan speed.

Dickerson, J.

1991-06-01T23:59:59.000Z

299

Flue gas injection control of silica in cooling towers.  

Science Conference Proceedings (OSTI)

Injection of CO{sub 2}-laden flue gas can decrease the potential for silica and calcite scale formation in cooling tower blowdown by lowering solution pH to decrease equilibrium calcite solubility and kinetic rates of silica polymerization. Flue gas injection might best inhibit scale formation in power plant cooling towers that use impaired makeup waters - for example, groundwaters that contain relatively high levels of calcium, alkalinity, and silica. Groundwaters brought to the surface for cooling will degas CO{sub 2} and increase their pH by 1-2 units, possibly precipitating calcite in the process. Recarbonation with flue gas can lower the pHs of these fluids back to roughly their initial pH. Flue gas carbonation probably cannot lower pHs to much below pH 6 because the pHs of impaired waters, once outgassed at the surface, are likely to be relatively alkaline. Silica polymerization to form scale occurs most rapidly at pH {approx} 8.3 at 25 C; polymerization is slower at higher and lower pH. pH 7 fluids containing {approx}220 ppm SiO{sub 2} require > 180 hours equilibration to begin forming scale whereas at pH 8.3 scale formation is complete within 36 hours. Flue gas injection that lowers pHs to {approx} 7 should allow substantially higher concentration factors. Periodic cycling to lower recoveries - hence lower silica concentrations - might be required though. Higher concentration factors enabled by flue gas injection should decrease concentrate volumes and disposal costs by roughly half.

Brady, Patrick Vane; Anderson, Howard L., Jr.; Altman, Susan Jeanne

2011-06-01T23:59:59.000Z

300

Adjudication of a Contract for the Construction of the Cooling Tower Complex for the North Experimental Area  

E-Print Network (OSTI)

Adjudication of a Contract for the Construction of the Cooling Tower Complex for the North Experimental Area

1976-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

A case history of a coal gasification wastewater cooling tower at the Great Plains coal gasification project  

SciTech Connect

This paper describes the conceptual process design of the Great Plains cooling water system, the fouling history of the cooling tower, and the results of the design modifications. In addition, general design guidelines for future wastewater reuse cooling towers are recommended. By following these guidelines, design engineers can minimize the risk of fouling that could impair a wastewater cooling tower's thermal performance.

Crocker, B.R.; Bromel, M.C.; Pontbriand, M.W.

1987-01-01T23:59:59.000Z

302

Radiometric Modeling of Mechanical Draft Cooling Towers to Assist in the Extraction of their Absolute Temperature from  

E-Print Network (OSTI)

Radiometric Modeling of Mechanical Draft Cooling Towers to Assist in the Extraction108, Aiken, SC, USA ABSTRACT Determining the internal temperature of a mechanical draft cooling tower is to estimate the temperature of the air exiting a mechanical draft cooling tower (MDCT) through the use

Salvaggio, Carl

303

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11,722 results. Download CX-001634: Categorical Exclusion Determination Meteorological Tower Installation Mille Lacs Band of Ojibwa Indian Reservation CX(s) Applied: B3.1, A9...

304

Categorical Exclusion Determinations: Native American and Alaskan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 8, 2010 CX-001634: Categorical Exclusion Determination Meteorological Tower Installation Mille Lacs Band of Ojibwa Indian Reservation CX(s) Applied: B3.1, A9 Date: 04082010...

305

Mille Lacs Energy Cooperative | Open Energy Information  

Open Energy Info (EERE)

Mille Lacs Energy Cooperative Mille Lacs Energy Cooperative (Redirected from Mille Lacs Electric Coop) Jump to: navigation, search Name Mille Lacs Energy Cooperative Place Minnesota Utility Id 12546 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes ISO MISO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Dual Fuel Space Heating Rate Electric Combination Heating Rate Freedom Heating Rate Residential General Service Residential Green Power Energy Large Power Commercial Large Power - Industrial Industrial Light - 100 watt HPS Lighting Light - 150 watt HPS Lighting

306

Yang-Mills Gravity in Biconformal Space  

E-Print Network (OSTI)

We propose a new conformal supergravity model with direct relevance to string/gauge theory dualities. This biconformal supergravity theory is formulated with a Yang-Mills type action. The resulting 8-dim symplectic geometries describe 4-dim scale-invariant general relativity. We then show an extension of N = 4 SUSY Yang-Mills to a curved biconformal geometry such that the extended form of the Yang-Mills fields provides the curvatures for the biconformal space. These curvatures solve the biconformal field equations whenever the original 4-dim fields satisfy the 4-dim YM theory. This gives a 1-1 mapping between the gravity and gauge theories. We also display systematic extension of any spacetime co-tangent bundle to a biconformal space, and extension of any 4-dim Yang-Mills theory to an equivalent theory on that space. 1

Lara B. Anderson; James T. Wheeler

2008-01-01T23:59:59.000Z

307

Yang- Mills on Quantum Heisenberg Manifolds  

E-Print Network (OSTI)

In the noncommutative geometry program of Connes there are two variations of the concept of Yang-Mills action functional. We show that for the quantum Heisenberg manifolds they agree.

Partha Sarathi Chakraborty; Satyajit Guin

2013-04-29T23:59:59.000Z

308

DCnet Research Network David L. Mills  

E-Print Network (OSTI)

Washington, DC Evans-gw and mudge-gw are dual-redundant EECIS department routers for 10/100-Mb campus printer server 128.4.2.21 wiley Pentium II 450MHz Windows XP Beverly Mills #12;2-Aug-04 10 DC MITBBN BELL2-Aug-04 1 DC MITBBN BELL DARPA UDEL DCnet Research Network David L. Mills University of Delaware

Mills, David L.

309

Low-Cost Installation of Concentrating Photovoltaic  

E-Print Network (OSTI)

Low-Cost Installation of Concentrating Photovoltaic Renewable Energy Research Renewable Energy Research http://www.energy.ca.gov/research/renewabl e/index.html August 2011 The Issue Several factors inhibit the potential growth of the California photovoltaic market: high installation costs, expenses

310

Photovoltaic Installations at Williams College Ruth Aronoff  

E-Print Network (OSTI)

of thumb that 10 Watts of power fit into every square foot of roof space (or 0.1 square meters). This means of the total array, panels cost between $7.50 and $10 per Watt of power installed; smaller systems cost slightly more to install per Watt, while larger systems cost less since they are bought in bulk

Aalberts, Daniel P.

311

Installation package for the solaron solar subsystems  

DOE Green Energy (OSTI)

This package contains information that is intended to be a guide for installation, operation, and maintenance of the various Solaron Solar Subsystems. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and off-peak storage. Two prototype residential systems have been installed at Akron, Ohio, and Duffield, Virginia.

Not Available

1979-04-01T23:59:59.000Z

312

Installation package for a solar heating system  

DOE Green Energy (OSTI)

Installation information is presented for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings. The Solar Engineering and Equipment Company (SEECO) developed this prototype solar heating system consisting of the following subsystems: solar collectors, control and storage.

Not Available

1978-12-01T23:59:59.000Z

313

Expanding Malware Defense by Securing Software Installations  

E-Print Network (OSTI)

installations. Our technique can support a diversity of package managers and software installers. It is based of the files used by benign software packages, thus blocking the most common mechanism used by malware future runs of an untrusted package will take place within an administrator-specified sandbox. Our

Sekar, R.

314

Improvement of risk estimate on wind turbine tower buckled by hurricane  

E-Print Network (OSTI)

Wind is one of the important reasonable resources. However, wind turbine towers are sure to be threatened by hurricanes. In this paper, method to estimate the number of wind turbine towers that would be buckled by hurricanes is discussed. Monte Carlo simulations show that our method is much better than the previous one. Since in our method, the probability density function of the buckling probability of a single turbine tower in a single hurricane is obtained accurately but not from one approximated expression. The result in this paper may be useful to the design and maintenance of wind farms.

Li, Jingwei

2013-01-01T23:59:59.000Z

315

A FEED SCREW POWDER SEAL FOR THE REACTOR TOWER  

SciTech Connect

The two-way sealing of a feed screw for a fine powder corveyer is accomplished with a split gland. One end is externally threaded to receive the gland nut and the other end is flanged for bolting to a feed-screw housing. The correct installation of the gland is discussed. (C.J.G.)

Collier, M.

1959-11-26T23:59:59.000Z

316

Alstom 3-MW Wind Turbine Installed at NWTC (Fact Sheet)  

DOE Green Energy (OSTI)

The 3-MW Alstom wind turbine was installed at NREL's NWTC in October 2010. Test data will be used to validate advanced turbine design and analysis tools. NREL signed a Cooperative Research and Development Agreement with Alstom in 2010 to conduct certification testing on the company's 3-MW ECO 100 wind turbine and to validate models of Alstom's unique drivetrain concept. The turbine was installed at NREL's National Wind Technology Center (NWTC) in October 2010 and engineers began certification testing in 2011. Tests to be conducted by NREL include a power quality test to finalize the International Electrotechnical Commission (IEC) requirements for type certification of the 60-Hz unit. The successful outcome of this test will enable Alstom to begin commercial production of ECO 100 in the United States. NREL also will obtain additional measurements of power performance, acoustic noise, and system frequency to complement the 50 Hz results previously completed in Europe. After NREL completes the certification testing on the ECO 100, it will conduct long-term testing to validate gearbox performance to gain a better understanding of the machine's unique ALSTOM PURE TORQUE{trademark} drivetrain concept. In conventional wind turbines, the rotor is supported by the shaft-bearing gearbox assembly. Rotor loads are partially transmitted to the gearbox and may reduce gearbox reliability. In the ALSTOM PURE TORQUE concept, the rotor is supported by a cast frame running through the hub, which transfers bending loads directly to the tower. Torque is transmitted to the shaft through an elastic coupling at the front of the hub. According to Alstom, this system will increase wind turbine reliability and reduce operation and maintenance costs by isolating the gearbox from rotor loads. Gearbox reliability has challenged the wind energy industry for more than two decades. Gearbox failures require expensive and time-consuming replacement, significantly increasing the cost of wind plant operation while reducing the plant's power output and revenue. To solve gearbox reliability issues, NREL launched a Gearbox Reliability Collaborative (GRC) in 2006 and brought together the world's leading turbine manufacturers, consultants, and experts from more than 30 companies and organizations. GRC's goal was to validate the typical design process-from wind turbine system loads to bearing ratings-through a comprehensive dynamometer and field-test program. Design analyses will form a basis for improving reliability of future designs and retrofit packages. Through its study of Alstom's Eco 100 gearbox, NREL can compare its GRC model gearbox with Alstom's and add the results to the GRC database, which is helping to advance more reliable wind turbine technology.

Not Available

2011-09-01T23:59:59.000Z

317

Influences on Burr Size During Face-Milling of Aluminum Alloys and Cast Iron  

E-Print Network (OSTI)

ON BURR SIZE DURING FACE-MILLING OF ALUMINUM-SILICON ALLOYSburrs formed during face milling. Other influences are tooliron. INTRODUCTION Face milling is a common procedure during

Shefelbine, Wendy; Dornfeld, David

2004-01-01T23:59:59.000Z

318

Energy Consumption Characterization and Reduction Strategies for Milling Machine Tool Use  

E-Print Network (OSTI)

Part Orientation for Face Milling, in: Annals of the CIRP,2010): Environmental Analysis of Milling Machine Tool Use inand Reduction Strategies for Milling Machine Tool Use Nancy

Diaz, Nancy; E. Redelsheimer; Dornfeld, David

2011-01-01T23:59:59.000Z

319

Environmental Analysis of Milling Machine Tool Use in Various Manufacturing Environments  

E-Print Network (OSTI)

Environmental Analysis of Milling Machine Tool Use inHorvath, David Dornfeld Milling is a type of cutting processof a standard vertical milling machine tool. In this

Diaz, Nancy; Helu, Moneer; Jayanathan, Stephen; Chen, Yifen; Horvath, Arpad; Dornfeld, David

2010-01-01T23:59:59.000Z

320

Jet milling from a particle perspective : predicting particle fracture based on mechanical material properties.  

E-Print Network (OSTI)

??Milling is a very old discipline originated in milling agricultural products to flour. Despite the enormous literature on size reduction, milling is a unit operation… (more)

Vegt, Onno Martinus

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

1981 Active-Solar-Installations Survey  

SciTech Connect

The survey gathered data on active residential and commercial solar systems installed during calendar year 1981 and a listing of firms involved in various aspects of the industry. The mail and telephone followup survey results are presented in 21 tables for combined national and state data. The total number of installations reported nationwide during 1981 was 122,907. Almost 95% of all reported installations were made in the single-family residential sector. The fewest quantity of installations (1.2%) was reported in the commercial sector. The remaining 4% was reported in the multifamily residential sector. Water heaters represented the largest number of systems installed in single-family, multifamily, and commercial buildings. The average size of water-heating systems in single-family homes was 61 square feet with an average cost of $3,235. Pool heaters represented the second largest number of systems installed in single-family and multifamily homes and represented 16.4% of the total installations. The average size of pool heaters in single-family homes was 376 square feet with an average cost of $3,455.

1982-12-01T23:59:59.000Z

322

Energy Conservation Installation Credit | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Conservation Installation Credit Energy Conservation Installation Credit Energy Conservation Installation Credit < Back Eligibility Multi-Family Residential Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Home Weatherization Commercial Weatherization Sealing Your Home Cooling Design & Remodeling Windows, Doors, & Skylights Ventilation Heat Pumps Appliances & Electronics Commercial Lighting Lighting Water Heating Maximum Rebate 500 per individual; up to 1,000 for a married couple filing jointly Program Info State Montana Program Type Personal Tax Credit Rebate Amount 25% of cost of capital investment Provider Montana Department of Revenue Individual taxpayers may claim a credit against their tax liability for up to 25% of the costs of investment for energy conservation purposes in a

323

Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.  

SciTech Connect

Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

2011-12-01T23:59:59.000Z

324

BREN Tower comes tumbling down as world record is set | National Nuclear  

National Nuclear Security Administration (NNSA)

BREN Tower comes tumbling down as world record is set | National Nuclear BREN Tower comes tumbling down as world record is set | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > BREN Tower comes tumbling down as world ... BREN Tower comes tumbling down as world record is set Posted By Office of Public Affairs NNSA Blog Some 345 tons of steel came tumbling down yesterday as a world

325

Lab Helps FAA Build Energy-Efficient Control Towers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lab Helps FAA Build Energy-Efficient Control Towers Lab Helps FAA Build Energy-Efficient Control Towers Lab Helps FAA Build Energy-Efficient Control Towers April 23, 2010 - 10:57am Addthis With help from the Pacific Northwest National Laboratory and its subcontractor, Redhorse Corporation, the agency that keeps our country's airports running is bolstering its energy efficiency. The Federal Aviation Administration is developing building plans that save energy - and money - at five airports in the western U.S. Government agencies are required by law to audit their buildings, so the FAA saw some Recovery Act funding as an opportunity to help fund its energy audits. Air traffic control towers are a vital service for travelers, keeping air traffic free of accidents. Their accompanying base buildings house administrative offices and support systems.

326

BREN Tower comes tumbling down as world record is set | National Nuclear  

NLE Websites -- All DOE Office Websites (Extended Search)

BREN Tower comes tumbling down as world record is set | National Nuclear BREN Tower comes tumbling down as world record is set | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > BREN Tower comes tumbling down as world ... BREN Tower comes tumbling down as world record is set Posted By Office of Public Affairs NNSA Blog Some 345 tons of steel came tumbling down yesterday as a world

327

Raw Data from National Wind Technology Center M2 Tower (2001...  

Open Energy Info (EERE)

2001 - 2011) This raw data reflects readings from instruments mounted on or near a 82 meter meteorological tower located at the

328

Raw Data from National Wind Technology Center M2 Tower (1996...  

Open Energy Info (EERE)

1996 - 2001) This raw data reflects readings from instruments mounted on or near a 82 meter meteorological tower located at the 

329

BREN Tower: A Monument to the Material Culture of Radiation Dosimetry Research  

Science Conference Proceedings (OSTI)

With a height of more than 1,500 feet, the BREN (Bare Reactor Experiment, Nevada) Tower dominates the surrounding desert landscape of the Nevada Test Site. Associated with the nuclear research and atmospheric testing programs carried out during the 1950s and 1960s, the tower was a vital component in a series of experiments aimed at characterizing radiation fields from nuclear detonations. Research programs conducted at the tower provided the data for the baseline dosimetry studies crucial to determining the radiation dose rates received by the atomic bomb survivors of Hiroshima and Nagasaki, Japan. Today, BREN Tower stands as a monument to early dosimetry research and one of the legacies of the Cold War.

Susan Edwards

2008-05-30T23:59:59.000Z

330

Some Turbulence and Diffusion Parameter Estimates within Cooling Tower Plumes Derived from Sodar Data  

Science Conference Proceedings (OSTI)

Temperature and velocity fluctuations within a cooling tower plume in stable conditions at the Keystone power plant in Pennsylvania have been measured by use of a calibrated sodar. Monostatic and bistatic systems probed the plume at several ...

R. L. Coulter; K. H. Underwood

1980-12-01T23:59:59.000Z

331

From Hot Towers to TRMM: Joanne Simpson and Advances in Tropical Convection Research  

Science Conference Proceedings (OSTI)

Joanne Simpson began contributing to advances in tropical convection about half a century ago. The hot tower hypothesis jointly put forth by Joanne Simpson and Herbert Riehl postulated that deep convective clouds populating the “equatorial trough ...

Robert A. Houze Jr.

2003-01-01T23:59:59.000Z

332

Electrically Active Hot Towers in African Easterly Waves prior to Tropical Cyclogenesis  

Science Conference Proceedings (OSTI)

It has been hypothesized that intense convective-scale “hot” towers play a role in tropical cyclogenesis via dynamic and thermodynamic feedbacks on the larger-scale circulation. In this study the authors investigate the role that widespread and/...

Kenneth D. Leppert II; Walter A. Petersen

2010-03-01T23:59:59.000Z

333

Evaluation of the Reanalysis Products from GSFC, NCEP, and ECMWF Using Flux Tower Observations  

Science Conference Proceedings (OSTI)

Reanalysis products produced at the various centers around the globe are utilized for many different scientific endeavors, including forcing land surface models and creating surface flux estimates. Here, flux tower observations of temperature, ...

Mark Decker; Michael A. Brunke; Zhuo Wang; Koichi Sakaguchi; Xubin Zeng; Michael G. Bosilovich

2012-03-01T23:59:59.000Z

334

Quality Control and Flux Sampling Problems for Tower and Aircraft Data  

Science Conference Proceedings (OSTI)

A series of automated tests is developed for tower and aircraft time series to identify instrumentation problems, flux sampling problems, and physically plausible but unusual situations. The automated procedures serve as a safety net for quality ...

Dean Vickers; L. Mahrt

1997-06-01T23:59:59.000Z

335

Finestructure of Elevated Stable Layers Observed by Sounder and In Situ Tower Sensors  

Science Conference Proceedings (OSTI)

A study of the finestructure within elevated stable atmospheric layers is described. The observational program consisted of measurements made with fast-response turbulence sensors on a carriage traversing a 300 m tower and comparison of the ...

E. E. Gossard; J. E. Gaynor; R. J. Zamora; W. D. Neff

1985-10-01T23:59:59.000Z

336

Estimation of Blade and Tower Properties for the Gearbox Research Collaborative Wind Turbine  

SciTech Connect

This report documents the structural and modal properties of the blade and tower of a 3-bladed 750-kW upwind turbine to develop an aeroelastic model of the wind turbine.

Bir, G.S.; Oyague, F.

2007-11-01T23:59:59.000Z

337

Economic and design analysis of daylighting a commercial tower in a hot and humid climate  

E-Print Network (OSTI)

A forty story commercial office tower in Tampa, Florida was redesigned for daylighting. The methods are outlined and results illustrated, A cooling load comparison is done to determine the economic feasibility of such a ...

Roscow, Robert F

1981-01-01T23:59:59.000Z

338

Test of a Phased Array Sodar by Intercomparison with Tower Data  

Science Conference Proceedings (OSTI)

The phased array sodar PA2 recently manufactured by the French REMTECH enterprise was tested using tower data for comparison. Wind speed, wind direction, and the standard deviation of the horizontal wind direction (??) were measured continuously ...

S. Vogt; P. Thomas

1994-02-01T23:59:59.000Z

339

Studies on Mathematical Models for Characterizing Plume and Drift Behavior From Cooling Towers, Executive Report  

Science Conference Proceedings (OSTI)

This report summarizes the contents of a five-volume work on new models for predicting plume rise and drift deposition from single and multiple natural-draft and mechanical-draft cooling towers.

1981-04-01T23:59:59.000Z

340

A Study of Wind Stress Determination Methods from a Ship and an Offshore Tower  

Science Conference Proceedings (OSTI)

Comparisons are made between surface wind stress measurements obtained by the inertial-dissipation and direct covariance methods on a stable offshore tower and by the inertial-dissipation and bulk methods on a ship. The shipboard inertial-...

Paul A. Frederickson; Kenneth L. Davidson; James B. Edson

1997-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Hydrogen Storage in Wind Turbine Towers: Cost Analysis and Conceptual Design; Preprint  

Science Conference Proceedings (OSTI)

Low-cost hydrogen storage is recognized as a cornerstone of a renewables-hydrogen economy. Modern utility-scale wind turbine towers are typically conical steel structures that, in addition to supporting the rotor, could be used to store hydrogen. The most cost-effective hydrogen tower design would use substantially all of its volume for hydrogen storage and be designed at its crossover pressure. An 84-m tall hydrogen tower for a 1.5-MW turbine would cost an additional $84,000 (beyond the cost of the conventional tower) and would store 950 kg of hydrogen. The resulting incremental storage cost of $88/kg is approximately 30% of that for conventional pressure vessels.

Kottenstette, R.; Cotrell, J.

2003-09-01T23:59:59.000Z

342

An Atmospheric Solitary Gust Observed with a Doppler Radar, a Tall Tower and a Surface Network  

Science Conference Proceedings (OSTI)

Doppler radar and a 444 m tall instrumented tower provide a detailed view of the kinematic and thermodynamic structure of a solitary gust. A study of the data fields, and comparison with theoretical and laboratory work leads to the conclusion ...

Richard J. Doviak; Runsheng Ge

1984-09-01T23:59:59.000Z

343

Beyond the ivory tower : in search of a new form for campus-community relationships  

E-Print Network (OSTI)

The terms "ivory tower" and "town-gown" have long been used to characterize the relationship between institutions of higher education and the communities in which they reside. While these adversarial phrases reflect the ...

Bowman, Anne (Anne Renee)

2011-01-01T23:59:59.000Z

344

Global Distribution of Hot Towers in Tropical Cyclones Based on 11-Yr TRMM Data  

Science Conference Proceedings (OSTI)

Global distribution of hot towers in tropical cyclones (TCs) is statistically quantified using an 11-yr Tropical Rainfall Measuring Mission (TRMM) Tropical Cyclone Precipitation Feature (TCPF) database. From 6003 individual TRMM overpasses of 869 ...

Cheng Tao; Haiyan Jiang

2013-02-01T23:59:59.000Z

345

DOE - Office of Legacy Management -- Monticello Mill Site - UT 03  

NLE Websites -- All DOE Office Websites (Extended Search)

Mill Site - UT 03 Mill Site - UT 03 FUSRAP Considered Sites Site: Monticello Mill Site (UT.03) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Monticello, Utah, Disposal and Processing Sites Documents Related to Monticello Mill Site Monticello Mill Tailings Site Operable Unit III Interim Remedial Action Progress Report July 1999-July 2000. GJO-2000-163-TAR. September 2000 U.S. Department of Energy at Grand Junction 2003 Annual Inspection Monticello, Utah November 2003 2005 Annual Inspection of the Monticello Mill Tailings (USDOE) and Monticello Radioactively Contaminated Properties Sites December 2005 Office

346

Installed Geothermal Capacity | Open Energy Information  

Open Energy Info (EERE)

Geothermal Capacity Geothermal Capacity Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF Installed Geothermal Capacity International Market Map of U.S. Geothermal Power Plants List of U.S. Geothermal Power Plants Throughout the world geothermal energy is looked at as a potential source of renewable base-load power. As of 2005 there was 8,933 MW of installed power capacity within 24 countries. The International Geothermal Association (IGA) reported 55,709 GWh per year of geothermal electricity. The generation from 2005 to 2010 increased to 67,246 GWh, representing a 20% increase in the 5 year period. The IGA has projected that by 2015 the new installed capacity will reach 18,500 MW, nearly 10,000 MW greater than 2005. [1] Countries with the greatest increase in installed capacity (MW) between

347

File:Install.pdf | Open Energy Information  

Open Energy Info (EERE)

Install.pdf Install.pdf Jump to: navigation, search File File history File usage File:Install.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 86 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 13:48, 1 November 2012 Thumbnail for version as of 13:48, 1 November 2012 1,275 × 1,650 (86 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from "http://en.openei.org/w/index.php?title=File:Install.pdf&oldid=53281

348

Property:InstalledCapacity | Open Energy Information  

Open Energy Info (EERE)

InstalledCapacity InstalledCapacity Jump to: navigation, search Property Name InstalledCapacity Property Type Quantity Description Installed Capacity (MW) or also known as Total Generator Nameplate Capacity (Rated Power) Use this property to express potential electric energy generation, such as Nameplate Capacity. The default unit is megawatts (MW). For spatial capacity, use property Volume. Acceptable units (and their conversions) are: 1 MW,MWe,megawatt,Megawatt,MegaWatt,MEGAWATT,megawatts,Megawatt,MegaWatts,MEGAWATT,MEGAWATTS 1000 kW,kWe,KW,kilowatt,KiloWatt,KILOWATT,kilowatts,KiloWatts,KILOWATT,KILOWATTS 1000000 W,We,watt,watts,Watt,Watts,WATT,WATTS 1000000000 mW,milliwatt,milliwatts,MILLIWATT,MILLIWATTS 0.001 GW,gigawatt,gigawatts,Gigawatt,Gigawatts,GigaWatt,GigaWatts,GIGAWATT,GIGAWATTS

349

Performance of Installed Cooking Exhaust Devices  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance of Installed Cooking Exhaust Devices Performance of Installed Cooking Exhaust Devices Brett C. Singer, William W. Delp, Michael G. Apte, Philip N. Price Environmental Energy Technologies Division Lawrence Berkeley National Laboratory Berkeley, California, 94720 November 2011 Direct funding for this research was provided by the California Energy Commission through Contracts 500-05-026 and 500-08-061. Institutional support is provided to LBNL by the U.S. Department of Energy, Office of Science under Contract DE-AC02-05CH11231. LBNL-5265E-r1(3) Singer et al., Performance of Installed Cooking Exhaust Devices LBNL-5265E-r1(3) Performance of Installed Cooking Exhaust Devices Brett C. Singer 1

350

Peoples Gas – Single Family Direct Install (Illinois)  

Energy.gov (U.S. Department of Energy (DOE))

Owners of single-family homes, condos, townhomes and two-flats may be eligible for a free installation of new programmable thermostats, pipe insulation, showerheads, and faucet aerators through...

351

Install an Automatic Blowdown Control System  

SciTech Connect

This revised ITP steam tip sheet on installing automatic blowdown controls provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

352

Install Removable Insulation on Valves and Fittings  

Science Conference Proceedings (OSTI)

This revised ITP tip sheet on installing removable insulation on valves and fittings provides how-to advice for improving the system using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

353

Explosive Demolition of a Fire-Water Tower At East Tennessee Technology Park, Oak Ridge TN  

SciTech Connect

On June 17, 2006, the Department of Energy (DOE) successfully demolished a {approx}60 year old fire-water tower (K-1206-E), located at the East Tennessee Technology Park (ETTP) in Oak Ridge, TN, using strategically placed explosive charges. The subject demolition project was executed by MCM Management Corporation and Demolition Dynamics under the management of DoE's prime contractor Bechtel Jacobs Company LLC (BJC). The K-1206-E Fire Water Tower (Tower) supported the ETTP fire water protection system from the mid- 1950's until 1991. The 378,500-L (100,000-gallon) Tower, elevated 53-m (175-feet) above grade, was located in a grassy area within 152-m (500-feet) of several other occupied facilities. Electrical, control circuits and supply water servicing the Tower were deactivated in 2003. Free liquids and sludge were removed from the tank prior to demolition. Demolition of a facility employing explosive demolition at a federal site in the 'post-9/11 era' was a substantial challenge. The subject paper discusses: - the planning and coordination steps that were taken to successfully overcome the challenges prior to the demolition of the empty, deactivated Tower; - the method used for the engineered demolition of the Tower; and - the factors responsible for the successful execution of this demolition project. At least two previous attempts were made to demolish the Tower. In the first attempt, the execution of the project was deferred by the re-allocation of funds. In the subsequent attempt in 2004, the execution of this project was postponed due to concerns that an adjacent facility would have to shut down operations during the duration of mobilization and execution of the project and thereby incur potential financial losses. A total of 51 cubic meters (1,800 cubic feet) of demolition debris was generated, which was compliantly disposed of at a local landfill followed by site restoration.

Brooksbank, R.D.; Rood, M.S.; Amrit, S.K.; Harper, M.S.; Dypolt, D.J.; Brehse, Mike [Bechtel Jacobs Company LLC, P.O. Box 4699 Oak Ridge, TN 37931 (United States)

2008-01-15T23:59:59.000Z

354

Surface and Tower Meteorological Instrumentation at Barrow (METTWR4H) Handbook  

Science Conference Proceedings (OSTI)

The Barrow meteorology station (BMET) uses mainly conventional in situ sensors mounted at four different heights (2m, 10m, 20m and 40m) on a 40 m tower to obtain profiles of wind speed, wind direction, air temperature, dew point and humidity. It also obtains barometric pressure, visibility and precipitation data from sensors at the base of the tower. Additionally, a Chilled Mirror Hygrometer and an Ultrasonic wind speed sensor are located near the 2m level for comparison purposes.

Ritsche, MT

2008-04-01T23:59:59.000Z

355

Vertical sampling flights in support of the 1981 ASCOT cooling tower experiments: field effort and data  

DOE Green Energy (OSTI)

During the month of August 1981, three nights of experimental sampling of tracers released into the cooling tower plume of a geothermal power plant were conducted. In these experiments a tethered balloon was used to lift a payload so as to obtain vertical profiles of the cooling tower plume and the entrained tracers. A description of the equipment used, the field effort and the data acquired are presented here.

Gay, G.T.

1982-03-01T23:59:59.000Z

356

Demolition of Cooling Towers from the World's First Commercial Reactors - the Nuclear Factor  

Science Conference Proceedings (OSTI)

The demolition of hyperbolic cooling towers would be a relatively routine demolition project because the method of demolition has been proven straightforward and repeatable with the successful demolition of over 200 similar structures in the last 30 years. This paper will detail the unique aspects of the planning and execution of the cooling tower demolition project due to its location on a nuclear site and proximity to active nuclear operations. (authors)

Foss, D.L. [British Nuclear Group Sellafield Ltd, Sellafield, Seascale, Cumbria, CA20 1PG (United Kingdom)

2006-07-01T23:59:59.000Z

357

CATEGORICAL EXCLUSION FOR INSTALLING A PHOTOVOLTAIC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-PNSO-0657 -PNSO-0657 CATEGORICAL EXCLUSION FOR INSTALLING A PHOTOVOLTAIC POWER GENERATION ARRAY AND ELECTRIC CAR CHARGING STATIONS, ENVIRONMENTAL MOLECULAR SCIENCES LABORATORY, PACIFIC NORTHWEST SITE OFFICE, RICHLAND, WASHINGTON Proposed Action The U.S. Department of Energy (DOE), Pacific Northwest Site Office (PNSO) proposes to install a photovoltaic power generation array and electric car charging stations. Location of Action The proposed action would occur in a landscaped infiltration swale located immediately

358

Riser, pipelines installed in Griffin field  

Science Conference Proceedings (OSTI)

A mooring riser and flow lines along with a 67-km, 8-in., gas-export pipelines have been installed offshore Australia for BHP Petroleum's Griffin field development. The 66-km gas line will carry Griffin field gas to an onshore gas-processing plant. Completing the projects ahead of schedule was Clough Stena Joint Venture (Asia), Perth. BHP awarded the contracts in early 1993; the project was completed in January this year. The paper describes the contractor, pipeline installation, and handling equipment.

Not Available

1994-05-23T23:59:59.000Z

359

An Evaluation of Molten-Salt Power Towers Including Results of the Solar Two Project  

DOE Green Energy (OSTI)

This report utilizes the results of the Solar Two project, as well as continuing technology development, to update the technical and economic status of molten-salt power towers. The report starts with an overview of power tower technology, including the progression from Solar One to the Solar Two project. This discussion is followed by a review of the Solar Two project--what was planned, what actually occurred, what was learned, and what was accomplished. The third section presents preliminary information regarding the likely configuration of the next molten-salt power tower plant. This section draws on Solar Two experience as well as results of continuing power tower development efforts conducted jointly by industry and Sandia National Laboratories. The fourth section details the expected performance and cost goals for the first commercial molten-salt power tower plant and includes a comparison of the commercial performance goals to the actual performance at Solar One and Solar Two. The final section summarizes the successes of Solar Two and the current technology development activities. The data collected from the Solar Two project suggest that the electricity cost goals established for power towers are reasonable and can be achieved with some simple design improvements.

REILLY, HUGH E.; KOLB, GREGORY J.

2001-11-01T23:59:59.000Z

360

Acoustic Imaging Evaluation of Juvenile Salmonid Behavior in the Immediate Forebay of the Water Temperature Control Tower at Cougar Dam, 2010  

SciTech Connect

This report presents the results of an evaluation of juvenile Chinook salmonid (Oncorhynchus tshawytscha) behavior in the immediate forebay of the Water Temperature Control (WTC) tower at Cougar Dam in 2010. The study was conducted by the Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers. The overall goal of the study was to characterize juvenile salmonid behavior and movement patterns in the immediate forebay of the WTC tower for fisheries resource managers to use to make decisions on bioengineering designs for long-term structures and/or operations to facilitate safe downstream passage for juvenile salmonids. We collected acoustic imaging (Dual-Frequency Identification Sonar; DIDSON) data from February 1, 2010 through January 31, 2011 to evaluate juvenile salmonid behavior year-round in the immediate forebay surface layer of the WTC tower (within 20 m, depth 0-5 m). From October 28, 2010 through January 31, 2011 a BlueView acoustic camera was also deployed in an attempt to determine its usefulness for future studies as well as augment the DIDSON data. For the DIDSON data, we processed a total of 35 separate 24-h periods systematically covering every other week in the 12-month study. Two different 24-hour periods were processed for the BlueView data for the feasibility study. Juvenile salmonids were present in the immediate forebay of the WTC tower throughout 2010. The juvenile salmonid abundance index was low in the spring (<200 fish per sample-day), began increasing in late April and peaked in mid-May. Fish abundance index began decreasing in early June and remained low in the summer months. Fish abundance increased again in the fall, starting in October, and peaked on November 8-9. A second peak occurred on December 22. Afterwards, abundance was low for the rest of the study (through January 2011). Average fish length for juvenile salmonids during early spring 2010 was 214 {+-} 86 mm (standard deviation). From May through early November, average fish length remained relatively consistent (132 {+-} 39 mm), after which average lengths increased to 294 {+-} 145 mm for mid-November though early December. Fish behavior analysis indicates milling in front of the intake tower was the most common behavior observed throughout the study period (>50% of total fish events). The next most common movement patterns were fish traversing along the front of the tower, east-to-west and west-to-east. The proportion of fish events seen moving into (forebay to tower) or out of (tower to forebay) the tower was generally low throughout the spring, summer, and early fall for both directions combined. From mid-December 2010 through the end of the study, the combined proportions of fish moving into and out of the tower were higher than previous months of this study. Schooling behavior was most distinct in the spring from late April through mid-June. Schooling events were present in 30 - 96% of the fish events during that period, with a peak in mid-May. Schooling events were also present in the summer, but at lower numbers. Diel distributions for schooling fish during spring, fall, and winter months indicate schooling was concentrated during daylight hours. No schooling was observed at night. Predator activity was observed during late spring, when fish abundance and schooling were highest for the year, and again in the fall months when fish events increased from a summer low. No predator activity was observed in the summer, and little activity occurred during the winter months. For the two days of BlueView data analyzed for vertical distribution in the forebay, a majority of fish (>50%) were present in the middle of the water column (10 - 20 m deep). Between 20 and 41 % of total fish abundance were found in the bottom of the water column (20 - 30 m deep). Few fish were observed in the top 10 m of the water column.

Khan, Fenton; Johnson, Gary E.; Royer, Ida M.; Phillips, Nathan RJ; Hughes, James S.; Fischer, Eric S.; Ploskey, Gene R.

2011-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Acoustic Imaging Evaluation of Juvenile Salmonid Behavior in the Immediate Forebay of the Water Temperature Control Tower at Cougar Dam, 2010  

Science Conference Proceedings (OSTI)

This report presents the results of an evaluation of juvenile Chinook salmonid (Oncorhynchus tshawytscha) behavior in the immediate forebay of the Water Temperature Control (WTC) tower at Cougar Dam in 2010. The study was conducted by the Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers. The overall goal of the study was to characterize juvenile salmonid behavior and movement patterns in the immediate forebay of the WTC tower for fisheries resource managers to use to make decisions on bioengineering designs for long-term structures and/or operations to facilitate safe downstream passage for juvenile salmonids. We collected acoustic imaging (Dual-Frequency Identification Sonar; DIDSON) data from February 1, 2010 through January 31, 2011 to evaluate juvenile salmonid behavior year-round in the immediate forebay surface layer of the WTC tower (within 20 m, depth 0-5 m). From October 28, 2010 through January 31, 2011 a BlueView acoustic camera was also deployed in an attempt to determine its usefulness for future studies as well as augment the DIDSON data. For the DIDSON data, we processed a total of 35 separate 24-h periods systematically covering every other week in the 12-month study. Two different 24-hour periods were processed for the BlueView data for the feasibility study. Juvenile salmonids were present in the immediate forebay of the WTC tower throughout 2010. The juvenile salmonid abundance index was low in the spring (fish per sample-day), began increasing in late April and peaked in mid-May. Fish abundance index began decreasing in early June and remained low in the summer months. Fish abundance increased again in the fall, starting in October, and peaked on November 8-9. A second peak occurred on December 22. Afterwards, abundance was low for the rest of the study (through January 2011). Average fish length for juvenile salmonids during early spring 2010 was 214 {+-} 86 mm (standard deviation). From May through early November, average fish length remained relatively consistent (132 {+-} 39 mm), after which average lengths increased to 294 {+-} 145 mm for mid-November though early December. Fish behavior analysis indicates milling in front of the intake tower was the most common behavior observed throughout the study period (>50% of total fish events). The next most common movement patterns were fish traversing along the front of the tower, east-to-west and west-to-east. The proportion of fish events seen moving into (forebay to tower) or out of (tower to forebay) the tower was generally low throughout the spring, summer, and early fall for both directions combined. From mid-December 2010 through the end of the study, the combined proportions of fish moving into and out of the tower were higher than previous months of this study. Schooling behavior was most distinct in the spring from late April through mid-June. Schooling events were present in 30 - 96% of the fish events during that period, with a peak in mid-May. Schooling events were also present in the summer, but at lower numbers. Diel distributions for schooling fish during spring, fall, and winter months indicate schooling was concentrated during daylight hours. No schooling was observed at night. Predator activity was observed during late spring, when fish abundance and schooling were highest for the year, and again in the fall months when fish events increased from a summer low. No predator activity was observed in the summer, and little activity occurred during the winter months. For the two days of BlueView data analyzed for vertical distribution in the forebay, a majority of fish (>50%) were present in the middle of the water column (10 - 20 m deep). Between 20 and 41 % of total fish abundance were found in the bottom of the water column (20 - 30 m deep). Few fish were observed in the top 10 m of the water column.

Khan, Fenton; Johnson, Gary E.; Royer, Ida M.; Phillips, Nathan RJ; Hughes, James S.; Fischer, Eric S.; Ploskey, Gene R.

2011-10-01T23:59:59.000Z

362

Transportation of the MOAB Uranium Mill Tailings to White Mesa Mill by Slurry Pipeline  

SciTech Connect

The Moab uranium mill tailings pile, located at the former Atlas Minerals Corporation site approximately three miles north of Moab, Utah, is now under the control of the US Department of Energy (''DOE''). The location of the tailings pile adjacent to the Colorado River, and the ongoing contamination of groundwater and seepage of pollutants into the river, have lead to the investigation, as part of the final site remediation program, of alternatives to relocate the tailings to a qualified permanent disposal site. This paper will describe the approach being taken by the team formed between International Uranium (USA) Corporation (''IUC'') and Washington Group International (''WGINT'') to develop an innovative technical proposal to relocate the Moab tailings to IUC's White Mesa Mill south of Blanding, Utah. The proposed approach for relocating the tailings involves using a slurry pipeline to transport the tailings to the White Mesa Mill. The White Mesa Mill is a fully licensed, active uranium mill site that is uniquely suited for permanent disposal of the Moab tailings. The tailings slurry would be dewatered at the White Mesa Mill, the slurry water would be recycled to the Moab site for reuse in slurry makeup, and the ''dry'' tailings would be permanently disposed of in an approved below grade cell at the mill site.

Hochstein, R. F.; Warner, R.; Wetz, T. V.

2003-02-26T23:59:59.000Z

363

Rotating Einstein-Yang-Mills Black Holes  

E-Print Network (OSTI)

We construct rotating hairy black holes in SU(2) Einstein-Yang-Mills theory. These stationary axially symmetric black holes are asymptotically flat. They possess non-trivial non-Abelian gauge fields outside their regular event horizon, and they carry non-Abelian electric charge. In the limit of vanishing angular momentum, they emerge from the neutral static spherically symmetric Einstein-Yang-Mills black holes, labelled by the node number of the gauge field function. With increasing angular momentum and mass, the non-Abelian electric charge of the solutions increases, but remains finite. The asymptotic expansion for these black hole solutions includes non-integer powers of the radial variable.

B. Kleihaus; J. Kunz; F. Navarro-Lerida

2002-07-10T23:59:59.000Z

364

EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah...

365

Pulp and Paper Mills: Profiting for Efficient Motor System Use...  

NLE Websites -- All DOE Office Websites (Extended Search)

Motor System Use This profile discusses how energy efficienct motor systems can help pulp and paper mills save money. Pulp and Paper Mills: Profiting for Efficient Motor System Use...

366

Pulverizer Maintenance Guide, Volume 1: Raymond Bowl Mills  

Science Conference Proceedings (OSTI)

This guide provides fossil plant personnel with current maintenance information on the Alstom Raymond Bowl mills and will assist a plant in improving the maintenance of the pulverizer mills.

2004-08-27T23:59:59.000Z

367

Biomass Burner Cogenerates Jobs and Electricity from Lumber Mill...  

NLE Websites -- All DOE Office Websites (Extended Search)

Burner Cogenerates Jobs and Electricity from Lumber Mill Waste Biomass Burner Cogenerates Jobs and Electricity from Lumber Mill Waste December 6, 2011 - 3:57pm Addthis Dale and...

368

Effect of Ball Milling Temperature on the Ultra Fine Grained ...  

Science Conference Proceedings (OSTI)

The mixtures of Fe-14Cr-3W-0.4Ti powder and Y2O3 were ball milled for 40 ... The size of nanoclusters seems to be dependent on milling temperature too.

369

Gravity and Yang?Mills Fields: Geometrical Approaches  

Science Conference Proceedings (OSTI)

A new geometrical framework for a tetrad?affine formulation of gravity coupled with Yang?Mills fields is proposed.

Roberto Cianci; Stefano Vignolo

2005-01-01T23:59:59.000Z

370

Focused Ion Beam Milling (FIB) Information at NIST  

Science Conference Proceedings (OSTI)

Focused Ion Beam Milling (FIB) Information at NIST. Analysis of 3D Elemental Mapping Artifacts in Biological Specimens ...

2010-10-05T23:59:59.000Z

371

Nonperturbative and analytical approach to Yang-Mills thermodynamics  

E-Print Network (OSTI)

An analytical, macroscopic approach to SU(N) Yang-Mills thermodynamics is developed, tested,and applied.

Ralf Hofmann

2004-04-29T23:59:59.000Z

372

Mill Designed Bio bleaching Technologies  

DOE Green Energy (OSTI)

A key finding of this research program was that Laccase Mediator Systems (LMS) treatments on high-kappa kraft could be successfully accomplished providing substantial delignification (i.e., > 50%) without detrimental impact on viscosity and significantly improved yield properties. The efficiency of the LMS was evident since most of the lignin from the pulp was removed in less than one hour at 45 degrees C. Of the mediators investigated, violuric acid was the most effective vis-a-vis delignification. A comparative study between oxygen delignification and violuric acid revealed that under relatively mild conditions, a single or a double LMS{sub VA} treatment is comparable to a single or a double O stage. Of great notability was the retention of end viscosity of LMS{sub VA} treated pulps with respect to the end viscosity of oxygen treated pulps. These pulps could then be bleached to full brightness values employing conventional ECF bleaching technologies and the final pulp physical properties were equal and/or better than those bleached in a conventional ECF manner employing an aggressively O or OO stage initially. Spectral analyses of residual lignins isolated after LMS treated high-kappa kraft pulps revealed that similar to HBT, VA and NHA preferentially attack phenolic lignin moieties. In addition, a substantial decrease in aliphatic hydroxyl groups was also noted, suggesting side chain oxidation. In all cases, an increase in carboxylic acid was observed. Of notable importance was the different selectivity of NHA, VA and HBT towards lignin functional groups, despite the common N-OH moiety. C-5 condensed phenolic lignin groups were overall resistant to an LMS{sub NHA, HBT} treatments but to a lesser extent to an LMS{sub VA}. The inactiveness of these condensed lignin moieties was not observed when low-kappa kraft pulps were biobleached, suggesting that the LMS chemistry is influenced by the extent of delignification. We have also demonstrated that the current generation of laccase has a broad spectrum of operating parameters. Nonetheless, the development of future genetically engineered laccases with enhanced temperature, pH and redox potentials will dramatically improve the overall process. A second challenge for LMS bleaching technologies is the need to develop effective, catalytic mediators. From the literature we already know this is feasible since ABTS and some inorganic mediators are catalytic. Unfortunately, the mediators that exhibit catalytic properties do not exhibit significant delignification properties and this is a challenge for future research studies. Potential short-term mill application of laccase has been recently reported by Felby132 and Chandra133 as they have demonstrated that the physical properties of linerboard can be improved when exposed to laccase without a chemical mediator. In addition, xxx has shown that the addition of laccase to the whitewater of the paper machine has several benefits for the removal of colloidal materials. Finally, this research program has presented important features on the delignification chemistry of LMS{sub NHA} and LMS{sub VA} that, in the opinion of the author, are momentous contributions to the overall LMS chemistry/biochemistry knowledge base which will continue to have future benefits.

Institute of Paper Science Technology

2004-01-30T23:59:59.000Z

373

Environmental safety evaluations for nuclear installations  

SciTech Connect

Environmental safety has been an important consideration in the siting, design, and operation of nuclear installations. As a result there have been very few cases in which the releases of radioactive materials from these installations have posed a dosimetrically significant environmental risk, and almost all of these have been connected with accidents or other unintentional situations. In no situation do the intentional releases from nuclear installations appear to have posed significant environmental risks, and with adequate planning and design a high degree of environmental safety may be assured. Many disciplines are involved in the evaluation of safety for nuclear installations. These include such fundamental ones as physics, chemistry, and biology, and more specialized ones such as meteorology, engineering, ecology, medicine, and electronics. A comprehensive review of environmental surveillance data and estimates of dose commitments from nuclear installations suggests that compared to the doses from background and from fallout, those attributable to the effluents from nuclear facilities have been small and for the most part quite local. it is concluded that, the upper limit of the risk associated with exposure of up to a few millirems per year is indeed small compared to many other commonly accepted risks of living in present day society. (72 refurences) (CH)

Hull, A.P.

1973-01-01T23:59:59.000Z

374

Impact evaluation of a refrigeration control system installed at Columbia Colstor  

SciTech Connect

This impact evaluation of a computer-based refrigeration control system (RCS) installed at Columbia Colstor in 1990 was conducted for the Bonneville Power Administration (Bonneville) by Pacific Northwest Laboratory (PNL). Concurrent with installing the RCS, the plant was expanded by adding 13,900 m{sup 2} (150,000 ft{sup 2} of storage space and five freeze tunnels. Because this project involved a significant plant expansion, it was ineligible for participation in Bonneville`s Energy $avings Plan Program (E$P). Therefore, a special contract was negotiated. This contract followed, to the extent possible, the E$P principles, adminstrative procedures, and acquisition payment. The primary objectives of this impact evaluation were to assess how much electrical energy is being saved at Columbia Colstor as a result of the Bonneville`s acquisition payment and to determine how much the savings cost Bonneville and the region. The impact of the project was evaluated with a combination of engineering analysis, billing analysis, financial analysis, interviews, and submittal reviews. Based on this impact evaluation, energy savings from this project are expected to be at least 4,130,700 kilowatt-hours/year (kWh/yr), or 0.47 average megawatts (aMW). Because the refrigeration system at Columbia Colstor provides cooling to both the storage rooms and the freeze tunnels, it i not possible to state savings on a per-ton basis. The project cost $287,528 to install, and Columbia Colstor received payment of $180,375 (1991 dollars) from Bonneville for the acquisition of energy savings. The real levelized cost of these energy savings to Bonneville is 4.5 mills/kWh (in 1993 dollars) over the project`s assumed 15-year life, and the real levelized cost to the region is 7.6 mills/kWh in 1993 dollars, not including transmission and distribution effects.

Wrench, L.E.; Spanner, G.E.; Klevgard, L.A.; Sullivan, G.P.

1996-01-01T23:59:59.000Z

375

Tons of Heavy Metals in Mill Creek Sediments Heather Freeman  

E-Print Network (OSTI)

with industries. Paper, woolen, flour, and cotton mills, starch factories, slaughterhouses, distilleriesTons of Heavy Metals in Mill Creek Sediments Heather Freeman 8/30/99 Geology Department Advisors: Dr. Kees DeJong Dr. Barry Manyard Dr. David Nash #12;Tons of heavy metals in Mill Creek sediments

Maynard, J. Barry

376

Loop expansion in Yang-Mills thermodynamics  

E-Print Network (OSTI)

We argue that a selfconsistent spatial coarse-graining, which involves interacting (anti)calorons of unit topological charge modulus, implies that real-time loop expansions of thermodynamical quantities in the deconfining phase of SU(2) and SU(3) Yang-Mills thermodynamics are, modulo 1PI resummations, determined by a finite number of connected bubble diagrams.

Ralf Hofmann

2006-09-05T23:59:59.000Z

377

Focused helium ion beam milling and deposition  

Science Conference Proceedings (OSTI)

The use of a helium ion microscope with an integrated gas injection system for nanofabrication is explored by demonstrating the milling of fine features into single layered graphene and the controlled deposition of tungsten and platinum wires from gaseous ... Keywords: Beam-induced deposition, Focused ion beam, Gas injection system, Graphene, Helium ion microscope

S. A. Boden; Z. Moktadir; D. M. Bagnall; H. Mizuta; H. N. Rutt

2011-08-01T23:59:59.000Z

378

Electric Vehicle Supply Equipment Installed Cost Analysis  

Science Conference Proceedings (OSTI)

More than 140,000 plug-in electric vehicles (PEVs) have been sold since December 2010. Critical to maintaining this upward trend is achievement of a diverse and available charging infrastructure. The purpose of this study is to analyze one key element of the charging infrastructure—the cost of installation. While the fuel cost of electricity to charge a PEV is significantly lower than the cost of gasoline, the cost to hire an electrician to install electric vehicle supply equipment (EVSE) for ...

2013-12-06T23:59:59.000Z

379

Studies on Mathematical Models for Characterizing Plume and Drift Behavior From Cooling Towers, Volume 1: Review of European Researc h  

Science Conference Proceedings (OSTI)

This report presents the results to date of an effort to develop, improve, and validate mathematical models of plume dispersion from individual and clustered mechanical- and natural-draft cooling towers. This effort is focusing on prediction of visible plume trajectory and deposition of saline droplet drift. The goal is to provide useful tools for assessing the environmental impact of cooling tower plumes. Volume 1 summarizes European research on cooling-tower-plume dispersion.

1981-01-01T23:59:59.000Z

380

Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC  

DOE Green Energy (OSTI)

Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

Not Available

1980-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Approximating the Seismic Amplification Effects Experienced by Solar Towers Mounted on the Rooftops of Low-Rise Industrial Buildings.  

E-Print Network (OSTI)

?? This thesis investigates the acceleration amplification experienced by solar towers mounted on the rooftops of low-rise industrial buildings during a seismic event. Specifically, this… (more)

Balla, Peter Luiz

2013-01-01T23:59:59.000Z

382

Radiometric modeling of mechanical draft cooling towers to assist in the extraction of their absolute temperature from remote thermal imagery.  

E-Print Network (OSTI)

??Determination of the internal temperature of a mechanical draft cooling tower (MDCT) from remotely-sensed thermal imagery is important for many applications that provide input to… (more)

Montanaro, Matthew

2009-01-01T23:59:59.000Z

383

Alternative Fuels Data Center: Installation of Alternative Fuel Components  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Installation of Installation of Alternative Fuel Components in Vehicles to someone by E-mail Share Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Facebook Tweet about Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Twitter Bookmark Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Google Bookmark Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Delicious Rank Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on Digg Find More places to share Alternative Fuels Data Center: Installation of Alternative Fuel Components in Vehicles on AddThis.com... More in this section... Federal

384

Changes related to "New England Breeze Solar and Wind Installers...  

Open Energy Info (EERE)

this page on Facebook icon Twitter icon Changes related to "New England Breeze Solar and Wind Installers" New England Breeze Solar and Wind Installers Jump to:...

385

Safety Advisory 2007-03: OSHA Revises its Electrical Installation...  

NLE Websites -- All DOE Office Websites (Extended Search)

851. SUMMARY Changes to OSHA's general industry electrical installation standard focus on safety in the design and installation of electric equipment in the workplace. Some of the...

386

Five Million Smart Meters Installed Nationwide is Just the Beginning...  

NLE Websites -- All DOE Office Websites (Extended Search)

Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid Progress Five Million Smart Meters Installed Nationwide is Just the Beginning of Smart Grid...

387

Property:Installed Capacity (MW) | Open Energy Information  

Open Energy Info (EERE)

Capacity (MW) Jump to: navigation, search Property Name Installed Capacity (MW) Property Type Number Retrieved from "http:en.openei.orgwindex.php?titleProperty:InstalledCapac...

388

Installation Performance Report on Pneumatic Conveying Consolidation.  

Science Conference Proceedings (OSTI)

The management at Lane Plywood saw an opportunity to reduce energy consumption at the mill by combining two pneumatic conveying systems into a single system. The combined connected load on the original two systems was 175 HP. The connected load on the remaining system is a single 75 HP drive. After calculating the demand on the former system and projecting the demand on the present system, a savings of 198,549 kWh/year was projected. Lane Plywood pays on average of $O.01347/kWh for electrical energy. The value of the annual savings was $2,674. The cost estimate for the project was $22,100. On a simple payback basis the project was not attractive enough when compared to other capital opportunities. However, with the incentives offered by the Bonneville Power Administration, Sponsor Design Program, the project became attractive and was accomplished. From data collected in an extensive metering effort, energy savings are amounting to 254,274 kWh/year. This is over 56,000 kWh/year more than was projected. The reason for the favorable variance is a result of the method used by pneumatic conveying suppliers in forecasting drive blower drive loads. The mill management regards the project as having accomplished its objective and considers it a success.

Lane Plywood Corp.

1987-09-01T23:59:59.000Z

389

Installation-Restoration Program Records search for Des Moines Air National Guard Installation, Iowa  

SciTech Connect

Conclusions are: 1) Information obtained through interviews with 17 past and present installation personnel, installation records, shop folders, and field observations indicate that the Des Monies ANG Installation property has been used for disposal of small quantities of hazardous material in the past. 2) No evidence of environmental stress resulting from past disposal practices was observed at the Des Moines ANG installation. 3) In the priority listing of the three rated sites and their overall scores, the Facility 105 Vehicle Maintenance Fuel Tank, and the existing fire department training area, exhibit the most-significant potential (relative to the other Des Moines ANG Installation sites) for environmental concerns. 4) The old fire department training area located at Facility No. 228, is not considered to present significant concern for adverse effects on health or the environment.

1983-09-01T23:59:59.000Z

390

Offshore Wind Turbines and Their Installation  

Science Conference Proceedings (OSTI)

Offshore winds tend to be higher, more constant and not disturbed by rough terrain, so there is a large potential for utilizing wind energy near to the sea. Compared with the wind energy converters onland, wind turbine components offshore will subject ... Keywords: renewable energy, wind power generation, offshore wind turbines, offshore installation

Liwei Li; Jianxing Ren

2010-01-01T23:59:59.000Z

391

On software component co-installability  

Science Conference Proceedings (OSTI)

Modern software systems are built by composing components drawn from large repositories, whose size and complexity is increasing at a very fast pace. A fundamental challenge for the maintainability and the scalability of such software systems is the ... Keywords: co-installability, component, conflicts, dependencies, open source, package management

Roberto Di Cosmo; Jérôme Vouillon

2011-09-01T23:59:59.000Z

392

Performance of Installed Cooking Exhaust Devices  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance of Installed Cooking Exhaust Devices Performance of Installed Cooking Exhaust Devices Title Performance of Installed Cooking Exhaust Devices Publication Type Journal Article Refereed Designation Refereed LBNL Report Number LBNL-5265E Year of Publication 2012 Authors Singer, Brett C., William W. Delp, Michael G. Apte, and Phillip N. Price Journal Indoor Air Volume 22 Issue 3 Pagination 224-234 Date Published 06/2012 Keywords carbon monoxide, natural gas burners, nitrogen dioxide, range hood, task ventilation, unvented combustion, indoor environment group, Range Hood Test Facility Abstract The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) - including exhaust fan/microwave combination appliances - were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

393

Microsoft Word - CX-SpringCreek-WineCountry-TowerRelocationFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 29, 2012 November 29, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Justin Estes Project Manager - TELM-TPP-3 Proposed Action: Spring Creek - Wine County No. 1 Transmission Tower Relocation Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Multnomah County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to relocate one transmission tower, located on private agricultural land, which has been damaged by farm equipment. Currently, tower 29/3 on BPA's Spring Creek - Wine Country No. 1 transmission line, resides on an agricultural access road that is bordered on both sides by active agricultural fields. This

394

Wind energy conversion. Volume IX. Aerodynamics of wind turbine with tower disturbances  

DOE Green Energy (OSTI)

Lifting line theory which is the counterpart of Prandtl's lifting line theory for rotating wing is employed for the overall performance analysis of a horizontal axis wind turbine rotor operating in a uniform flow. The wake system is modeled by non-rigid wake which includes the radial expansion and the axial retardation of trailing vortices. For the non-uniform flow which are caused by the ground, the tower reflection, or the tower shadow, the unsteady airloads acting on the turbine blade are computed, using lifting line theory and a non-rigid wake model. An equation which gives the wind profile in the tower shadow region is developed. Also, the equations to determine pitch angle control are derived to minimize the flapping moment variations or the thrust variations due to the non-uniform flow over a rotation.

Chung, S.Y.

1978-09-01T23:59:59.000Z

395

Tower Design Load Verification on a 1-kW Wind Turbine: Preprint  

DOE Green Energy (OSTI)

Wind turbine testing at the National Wind Technology Center (NWTC) has been done to characterize both tower top loads and thrust loads for small wind turbines, which is part of an ongoing effort to model and predict small wind turbine behavior and the resulting stresses imposed on the supporting tower. To these ends, a 1-kW furling wind turbine mounted on a 10-meter tower was instrumented and monitored via a data acquisition system for nearly a year. This test was conducted to verify the design loads as predicted by the simple design equations provided in the draft revision of the International Electrotechnical Commission (IEC) Small Wind Turbine Safety Standard 61400-02 CDV (hereafter called ''the draft Standard''). Data were captured for several operating conditions covered by the draft Standard. This paper addresses the collected data and what conclusions can be made from it.

Prascher, D.; Huskey, A.

2004-11-01T23:59:59.000Z

396

Thermodynamic modeling and optimization of a screw compressor chiller and cooling tower system  

E-Print Network (OSTI)

This thesis presents a thermodynamic model for a screw chiller and cooling tower system for the purpose of developing an optimized control algorithm for the chiller plant. The thermodynamic chiller model is drawn from the thermodynamic models developed by Gordon and Ng (1996). However, the entropy production in the compressor is empirically related to the pressure difference measured across the compressor. The thermodynamic cooling tower model is the Baker & Shryock cooling tower model that is presented in ASHRAE Handbook - HVAC Systems and Equipment (1992). The models are coupled to form a chiller plant model which can be used to determine the optimal performance. Two correlations are then required to optimize the system: a wet-bulb/setpoint correlation and a fan speed/pump speed correlation. Using these correlations, a "quasi-optimal" operation can be achieved which will save 17% of the energy consumed by the chiller plant.

Graves, Rhett David

2003-12-01T23:59:59.000Z

397

Cooling Water Systems - Energy Savings/Lower Costs By Reusing Cooling Tower Blowdown  

E-Print Network (OSTI)

Reuse of cooling tower blow down cannot only provide energy conservation, but can provide water conservation and chemical conservation. To be effective, it is critical that the water treatment program be coordinated with the treatment of the blow down for reuse into the cooling tower system. Several plants have been built and operated with considerable difficulty regarding effective operation of the softener due to improper chemical selection. However, other plants have utilized the proper chemicals which not only improve the softener's performance and operation, but also effectively reduces the size of the softener. Thus, initial capital and operating savings are obtained. Detailed information is provided on guidelines and case histories of operating units.

Puckorius, P. R.

1981-01-01T23:59:59.000Z

398

Calder Hall Cooling Tower Demolition: Landmark Milestone for Decommissioning at Sellafield  

Science Conference Proceedings (OSTI)

September 2007 saw a very visible change to the Sellafield site following the culmination of a major decommissioning project; the demolition of the four Calder Hall cooling towers. A key part of the UK's nuclear industrial heritage, Calder Hall, the world's first commercial nuclear power station, was opened by Her Majesty Queen Elizabeth II in October 1953 and continued to generate electricity until its closure in 2003. Following the decision to decommission the Calder Hall site, explosive demolition was identified as the safest and most cost effective route for the removal of the towers. The technique, involving the placement of explosive in 60% of the circumference of both shell and legs, is a tried and tested method which had already been used successfully in more than 200 cooling towers in the UK in the last 30 years. The location and composition of the four 88 metre high towers also created additional challenges. Situated only 40 metres away from the UK's only nuclear Fuel Handling Plant, as well as other sensitive structures on the Sellafield site, the project had to address the impact of a number of key areas, including dust, ground vibration and air over pressure, to ensure that the demolition could be carried out safely and without significant impact on other operational areas on the site. At the same time, the towers had to be prepared for demolition in a way that minimised the amounts of radioactive or hazardous waste materials arising. This paper follows the four year journey from the initial decision to demolish the towers right through to the demolition itself as well as the clean up of the site post demolition. It will also consider the massive programme of work necessary not only to carry out the physical work safely but also to gain regulatory confidence and stakeholder support to carry out the project successfully. In summary: The demolition of the four Calder Hall cooling towers was a highly visible symbol of the changes that are occurring on the Sellafield site as it moves forward towards a decommissioning future. Although in itself the demolition was both straightforward and standard, the various complexities posed by the towers situation at Sellafield introduced an entirely new element to the project, with a number of complex challenges which had to be overcome or resolved before the demolition could take place. It is a testament to the skill and dedication of the project team and its associated contractors that the project was delivered safely and successfully without a single accident, injury or event throughout the entire four years, and with minimal impact on both site operations and the local community. (authors)

Williamson, E.J. [Nuclear Decommissioning and Major Projects Group, Sellafield Ltd, Seascale, Cumbria (United Kingdom)

2008-07-01T23:59:59.000Z

399

Elementary-Particle Propagation via 3-Scale ``Towers of Quartet Rings'' Within a Dyonic History Lattice  

E-Print Network (OSTI)

Massless elementary-particle propagation is represented historically (cosmologically) through 3-scale ``towers of quartet rings'' within a lattice of magneto-electrodynamically communicating ``pre-events''. The lightlike intervals within a ring of 4 pre-events (discrete ``closed string'') display transverse GUT-scale and longitudinal ``particle scale''. The lightlike (longitudinal) spacing between successive rings of a tower is at Planck scale. Ratio between GUT scale and Planck scale relates quantum-dynamically to elementary magnetic charge. Permutations of a ring quartet, in conjunction with Lorentz-group representations, control elementary-particle quantum numbers.

G. F. Chew

1999-01-28T23:59:59.000Z

400

Defective insulators in live working on a 550kV compact steel lattice tower  

Science Conference Proceedings (OSTI)

Research was conducted to determine the minimum number of healthy insulator units needed to ensure worker safety in live working on a compact 550 kV steel lattice tower. A large variety of worksite conditions was investigated. Test results confirm the conservative nature of the CIGRE formula for defective insulator units, and modifications to the formula are suggested. The recommended number of healthy units is 12 in a string of 24 units for the case of live work on the compact 550 kV tower, when the Portable Protective Gap (PPG) is used. Adjustment for altitude should be made above 900 m (3,000 ft).

Gela, G. [EPRI Power Delivery Center, Lenox, MA (United States); Kientz, H. [Western Area Power Administration, Golden, CO (United States); Fox, H.J. Jr. [Public Service Electric and Gas, Bridgewater, NJ (United States); Mitchell, J.D. [Alabama Power Co., Birmingham, AL (United States); Lyons, P.F. [EPRI, Haslet, TX (United States)

1997-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Strategy for the Operation of Cooling Towers with variable Speed Fans  

E-Print Network (OSTI)

Within the SPS Cooling Water Project at CERN aimed at the reduction of water consumption, this primary open cooling loop will be closed and all the primary cooling circuit components will be upgraded to the new required duty and brought to the necessary safety and operability standards. In particular the tower fans will be fitted with variable frequency drives to replace the existing two speed motors. This paper presents a study to optimize the operation of SPS cooling towers taking into account outdoor conditions (wet and dry bulb temperatures) and the entirety of the primary circuit in which they will operate.

Ińigo-Golfín, J

2001-01-01T23:59:59.000Z

402

Engineering Study for a Full Scale Demonstration of Steam Reforming Black Liquor Gasification at Georgia-Pacific's Mill in Big Island, Virginia  

SciTech Connect

Georgia-Pacific Corporation performed an engineering study to determine the feasibility of installing a full-scale demonstration project of steam reforming black liquor chemical recovery at Georgia-Pacific's mill in Big Island, Virginia. The technology considered was the Pulse Enhanced Steam Reforming technology that was developed and patented by Manufacturing and Technology Conversion, International (MTCI) and is currently licensed to StoneChem, Inc., for use in North America. Pilot studies of steam reforming have been carried out on a 25-ton per day reformer at Inland Container's Ontario, California mill and on a 50-ton per day unit at Weyerhaeuser's New Bern, North Carolina mill.

Robert De Carrera; Mike Ohl

2002-03-19T23:59:59.000Z

403

Ozone and UV for Grain Milling Systems  

Science Conference Proceedings (OSTI)

Recognizing the current concerns with food safety, First Energy Services and EPRI collaborated in a project to investigate the feasibility of using ozone as a substitute for chlorinated water to control bacteria and mold at the Harvest States Amber Milling facility in Huron, Ohio. Traditionally, chlorinated water is used to control bacteria and mold in grain processing. Since chlorine usage can be costly and because chlorine presents problems in storage and safe handling of chlorine gas, the project part...

2000-12-13T23:59:59.000Z

404

YANG-MILLS THEORY FOR BUNDLE GERBES  

E-Print Network (OSTI)

Abstract. Given a bundle gerbe with connection on an oriented Riemannian manifold of dimension at least equal to 3, we formulate and study the associated Yang-Mills equations. When the Riemannian manifold is compact and oriented, we prove the existence of instanton solutions to the equations and also determine the moduli space of instantons, thus giving a complete analysis in this case. We also study duality in this context.

Varghese Mathai; David Roberts

2005-01-01T23:59:59.000Z

405

in Topological Yang-Mills Theory  

E-Print Network (OSTI)

We introduce the covariant forms for the non-Abelian anomaly counterparts in topological Yang-Mills theory, which satisfies the topological descent equation modulo terms that vanish at the space of BRST fixed points. We use the covariant anomalies as a new set of observables, which can absorb both ? W and ? BRS ghost number violations of zeromodes. Then, we study some problems due to the zero-modes originated from the reducible connections.

unknown authors

1992-01-01T23:59:59.000Z

406

Milwaukee Installer Reflects on His Career In Solar  

Energy.gov (U.S. Department of Energy (DOE))

Interested in joining America's solar workforce? One Milwaukee solar installer shares his career reflections and advice.

407

Acoustic Imaging Evaluation of Juvenile Salmonid Behavior in the Immediate Forebay of the Water Temperature Control Tower at Cougar Dam, 2010  

SciTech Connect

This report presents the results of an evaluation of juvenile Chinook salmon (Oncorhynchus tshawytscha) behavior at Cougar Dam on the south fork of the McKenzie River in Oregon in 2010. The study was conducted by the Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers (USACE). The overall goal of the study was to characterize juvenile salmonid behavior and movement patterns in the immediate forebay of the Water Temperature Control (WTC) tower of the dam for USACE and fisheries resource managers use in making decisions about bioengineering designs for long-term structures and/or operations to facilitate safe downstream passage for juvenile salmonids. We collected acoustic imaging (Dual-Frequency Identification Sonar; DIDSON) data from March 1, 2010, through January 31, 2011. Juvenile salmonids (hereafter, called 'fish') were present in the immediate forebay of the WTC tower throughout the study. Fish abundance index was low in early spring (<200 fish per sample-day), increased in late April, and peaked on May 19 (6,039 fish). A second peak was observed on June 6 (2904 fish). Fish abundance index decreased in early June and remained low in the summer months (<100 fish per sample-day). During the fall and winter, fish numbers varied with a peak on November 10 (1881 fish) and a minimum on December 7 (12 fish). A second, smaller, peak occurred on December 22 (607 fish). A univariate statistical analysis indicated fish abundance index (log10-transformed) was significantly (P<0.05) positively correlated with forebay elevation, velocity over the WTC tower intake gate weirs, and river flows into the reservoir. A subsequent multiple regression analysis resulted in a model (R2=0.70) predicting fish abundance (log-transformed index values) using two independent variables of mean forebay elevation and the log10 of the forebay elevation range. From the approximate fish length measurements made using the DIDSON imaging software, the average fish length during early spring 2010 was 214 {+-} 86 mm (standard deviation). From May through early November, the average fish length remained relatively consistent (132 {+-} 54 mm), after which average lengths increased to 295 {+-} 148 mm for mid-November though early December. From mid-December through January the average fish length decreased to 151 {+-} 76 mm. Milling in front of the WTC tower was the most common fish behavior observed throughout the study period. Traversing along the front of the tower, east-to-west and west-to-east, was the next common behavior. The percentage of fish events showing movement from the forebay to the tower or from the tower to the forebay was generally low throughout the spring, summer, and early fall (0 to 30% for both directions combined, March through early November). From mid-November 2010 through the end of the study (January 31, 2011), the combined percentages of fish moving into and out of the tower were higher (25 to 70%) than during previous months of the study. Schooling behavior was most distinct in the spring. Schooling events were present in 30 to 96% of the fish events during that period, with a peak on May 19. Schooling events were also present in the summer, but at lower numbers. With the exception of some schooling in mid-December, few to no schooling events were observed in the fall and winter months. Diel distributions for schooling fish during spring and fall months indicate schooling was concentrated during daylight hours and no schooling was observed at night. However, in December, schooling occurred at night, after midnight, and during daylight hours. Predator activity, most likely bull trout or rainbow trout according to a USACE biologist, was observed during late spring, when fish abundance index and schooling were highest for the year, and again in the fall months when fish events increased from a summer low. No predator activity was observed in the summer, and little activity occurred during the winter months.

Khan, Fenton; Johnson, Gary E.; Royer, Ida M.; Phillips, Nathan RJ; Hughes, James S.; Fischer, Eric S.; Ham, Kenneth D.; Ploskey, Gene R.

2012-04-01T23:59:59.000Z

408

Accessibility in 5-Axis Milling Environment  

E-Print Network (OSTI)

Using algorithms from computer graphics, namely hidden line and surface removal, techniques have been constructed to derive the 3-axis visible or millable set of a computer model from a given orientation or simulate and verify machining toolpaths. In this paper, an approach that reduces the accessibility problem of 5-axis milling using a flat end tool into a 3-axis accessibility problem is discussed. Using this approach, global detection of possible gouging into other parts, while a 5-axis flat end mill is in use, is made feasible and collisions can be avoided. Key Words: NURBs, accessibility, 5-axis machining. 1 Introduction Several methods are in use, when freeform computer models are realized using milling machines. Possibly the most common approach utilizes a ball end tool with three degrees of freedom, namely translation in x, y, and z [1, 2, 4, 5, 6, 7]. The ball end center of the tool follows an offset [8] to the model by the tool radius while the ball end surface is tangent to...

Gershon Elber

1997-01-01T23:59:59.000Z

409

Installation package for Sunpak solar collectors  

DOE Green Energy (OSTI)

Owens-Illinois, Inc., has developed a subsystem (air/liquid vacuum collector) for use with solar combined heating and cooling subsystems. The Model SEC-601 collector is modular in design, is approximately twelve-feet-three-inches wide and is eight-feet-seven-inches high. The module contains 72 collector tube elements and weighs approximately 300 pounds. The Installation, Operating, and Maintenance Instructions, List of Materials and the Assembly Drawing are presented.

Not Available

1978-09-01T23:59:59.000Z

410

Power reduction control for inductive lighting installation  

SciTech Connect

A control system for continuously, selectively reducing power consumption in an inductive lighting installation energized from an A.C. power source, the installation including at least one gas discharge lamp such as a fluorescent lamp energized through any of a plurality of different types of electromagnetic ballast having different harmonic distortion characteristics, the control system is described comprising: load energizing circuit means, including a signal-actuated normally-closed primary switch, for connecting an A.C. power source to the lighting installation; a signal-actuated, normally-open secondary switch connected in parallel with the lighting installation; actuation means for generating actuation signals and applying such actuation signals to the primary and secondary switches to actuate the primary switch open and to actuate the secondary switch closed in approximate time coincidence in each half-cycle of the A.C. power; zero-crossing detector means for generating zero-crossing signals at times TX indicative of zero-voltage transitions in the A.C. power; and program means, connected to the zero-crossing detector means and to the actuation means, programming the actuation means to generate (a) power reduction actuation signals at times T1 and T2 in each half-cycle of the A.C. power, (b) a first filter actuation signal at a time T3 prior to each zero-crossing time TX, and (c) a second filter actuation signal at a time T4 following each zero-crossing time TX; the program means including a plurality of programs each establishing a set of times T1, T2, T3 and T4 for several different power reduction levels for a particular type of ballast; and selection means for selecting a program to match the ballast type of the load.

Falk, K.R.

1993-06-22T23:59:59.000Z

411

Near-Neutral Surface Layer Turbulence at the Boulder Atmospheric Observatory Tower: Evidence of Increasing Vertical Turbulence with Height  

Science Conference Proceedings (OSTI)

Wind and turbulence profiles were analyzed during breezy, near-neutral conditions at the Boulder Atmospheric Observatory tower to quantify the effects of an abrupt 20- to 30-m increase in terrain located 3–5 km west of the tower. Results indicate ...

Brent M. Bowen

2000-05-01T23:59:59.000Z

412

Extra-Territorial Siting of Nuclear Installations  

Science Conference Proceedings (OSTI)

Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means to introduce nuclear activities into areas where political, financial or technical capabilities might otherwise make such activities unsound, or as a means to enable global solutions to be instituted for major nuclear concerns (e.g., spent fuel management). The paper examines practical matters associated with the legal and programmatic aspects of siting nuclear installations, including diplomatic/political frameworks, engaging competent industrial bodies, protection against seizure, regulation to ensure safety and security, waste management, and conditions related to the dissolution of the extra-territorial provisions as may be agreed as the host State(s) achieve the capabilities to own and operate the installations. The paper considers the potential for using such a mechanism across the spectrum of nuclear power activities, from mining to geological repositories for nuclear waste. The paper considers the non-proliferation dimensions associated with such arrangements, and the pros and cons affecting potential host States, technology vendor States, regional neighbors and the international community. It considers in brief potential applications in several locations today.

Shea, Thomas E.; Morris, Frederic A.

2009-10-07T23:59:59.000Z

413

Photovoltaic Installation on a Commercial Building (Bishop Museum) -- Design and Installation  

Science Conference Proceedings (OSTI)

This report, the first of two deliverable reports provided to the Electric Power Research Institute (EPRI) under Research and Development (R&D) Agreement No. EP-P7353/C3739 (Building Integrated Photovoltaic Commercial Building Project), provides information on the design and installation of a photovoltaic (PV) system installed at the State Museum of Natural and Cultural History (Bishop Museum) located in Honolulu, Hawaii. Details on structural specifications, PV system design and specifications, and less...

2004-02-13T23:59:59.000Z

414

DOE - Office of Legacy Management -- Edgemont Mill Site - SD 01  

Office of Legacy Management (LM)

Edgemont Mill Site - SD 01 Edgemont Mill Site - SD 01 FUSRAP Considered Sites Site: Edgemont Mill Site (SD.01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Edgemont, South Dakota, Disposal Site Documents Related to Edgemont Mill Site 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites-Edgemont, South Dakota, Disposal Site. LMS/S09415. November 2012 U.S. Department of Energy 2008 UMTRCA Title II Sites Annual Report November 2008 Edgemont, South Dakota FACT SHEET Office of Legacy Management Edgemont, South Dakota, Disposal Site This fact sheet provides information about the Uranium Mill

415

Gaskell Sun Tower and 2 others Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Gaskell Sun Tower and 2 others Solar Power Plant Gaskell Sun Tower and 2 others Solar Power Plant Jump to: navigation, search Name Gaskell Sun Tower and 2 others Solar Power Plant Facility Gaskell Sun Tower and 2 others Sector Solar Facility Type Concentrating Solar Power Facility Status Proposed Developer NRG Energy/eSolar Location Kern County, California Coordinates 35.4937274°, -118.8596804° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.4937274,"lon":-118.8596804,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

416

Experimental Study on Energy Efficiency of Heat-source Tower Heat Pump Units in Winter Condition  

Science Conference Proceedings (OSTI)

Building energy consumption in China has been increasing rapidly. And a small increase in the operation efficiency of the air-conditioning system can substantially decrease it. In this paper a new type heat pump is developed to improve the performance ... Keywords: Heat-source tower, Heat pump, Seasonal energy efficiency ratio(SEER), Hermal properties

Li Nianping; Zhang Wenjie; Wang Lijie; Liu Qiuke; Hu Jinhua

2011-01-01T23:59:59.000Z

417

The Passage of a Weak Thunderstorn Downburst over an Instrumented Tower  

Science Conference Proceedings (OSTI)

On 5 November 1977 a weak downburst associated with a multicell storm passed over an instrumented tower at Bald Hills, a suburb of Brisbane, Australia. Associated with the thunderstorm was a dome of cold air estimated to be 1200 to 1800 m deep. ...

Douglas J. Sherman

1987-06-01T23:59:59.000Z

418

Sea-Tower Measurements of Wind-Wave Spectra in the Caspian Sea  

Science Conference Proceedings (OSTI)

High frequency spectra of wind generated waves corresponding to mean wind speeds from 3.5 to 13.5 m s?1 were measured at the research tower in the Caspian Sea. The techniques used made it possible to evaluate spectra S(?) in the frequency range ...

I. A. Leykin; A. D. Rozenberg

1984-01-01T23:59:59.000Z

419

An iterative solution to the four-peg Tower of Hanoi problem  

Science Conference Proceedings (OSTI)

One of the variations of the Towers of Hanoi puzzle allows for p pegs, and for four pegs the solution to this variation is shown to have a simple structure which can be used to derive an iterative solution to the problem.

Appie van de Liefvoort

1990-01-01T23:59:59.000Z

420

The Vibration Frequencies of Wind Turbine Steel Tower by Transfer Matrix Method  

Science Conference Proceedings (OSTI)

Large-scale wind turbine structure is simplified as a slender cantilever beam with variable sections subject to complex loads configuration. An analytical procedure to estimate not only natural frequencies but also vibration mode shapes of thin-walled ... Keywords: horizontal axis wind turbine tower, natural frequency, transfer matrix method, free vibration

Wang Meng; Wang Zhangqi

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Wind Profiler and RASS Measurements Compared with Measurements from a 450-m-Tall Tower  

Science Conference Proceedings (OSTI)

A 915-MHz boundary layer wind profiler with radio acoustic sounding system (RASS) was sited 8 km from a very tall (450 m) television transmitting tower in north-central Wisconsin during the spring, summer, and autumn of 1995. The profiler ...

Wayne M. Angevine; Peter S. Bakwin; Kenneth J. Davis

1998-06-01T23:59:59.000Z

422

Study of Operating Control Strategies for Hybrid Ground Source Heat Pump System with Supplemental Cooling Tower  

Science Conference Proceedings (OSTI)

Ground source heat pump for cooling-dominated commercial buildings may utilize supplemental cooling towers to reduce system first cost and to improve system performance. The use of hybrid ground source heat pump (HGSP) can reduce the size of the ground-loop ... Keywords: hybrid ground source heat pump, supplement heat rejection, control strategies, operating performance

Wang Jinggang; Gao Xiaoxia; Yin Zhenjiang; Li Fang

2009-07-01T23:59:59.000Z

423

The Binary Cooling Tower Process: An Energy Conserving Water Reuse Technology  

E-Print Network (OSTI)

The Binary Cooling Tower (BCT) harnesses cooling system waste heat to accomplish concentration of waste and process streams. The BCT can also be integrated to isolate and improve the efficiency of critical cooling loops. This paper describes the BCT, its integration into a cooling system, and some energy saving applications

Lancaster, R. L.; Sanderson, W. G.; Cooke, R. L., Jr.

1981-01-01T23:59:59.000Z

424

Marginal Hilbert Spectrum Based on EMD Reconstruction and its Application in Fault Diagnosis of Cooling Tower  

Science Conference Proceedings (OSTI)

HHT (Hilbert-Huang Transform) is one kind of adaptive signal processing method and it is suitable for processing nonlinear and non-stationary signal. Amplitude-frequency characteristics of signal are accurately demonstrated through marginal Hilbert spectrum ... Keywords: Vibration signal, marginal Hilbert spectrum, Reconstruction filter, Fault diagnosis, Cooling tower

He Dhengyun, Yi Ding

2013-01-01T23:59:59.000Z

425

Wind Tunnel Experiment for Predicting a Visible Plume Region from a Nuclear Power Plant Cooling Tower  

Science Conference Proceedings (OSTI)

The current paper introduces a wind tunnel experiment to study the effect of the cooling tower of a Nuclear Power Plant (NPP) on the flow and the characteristics of visible plume regions. The relevant characteristics of the flow field near the ...

Guo Dong-peng; Yao Ren-tai; Fan Dan

426

Eastgate seen from the south-east, in front of Harare's glass and concrete towers  

E-Print Network (OSTI)

Eastgate seen from the south-east, in front of Harare's glass and concrete towers #12;Eastgate officesEastgate offices Level two #12;Sections showing the passive cooling system #12;Cooling the office the degree of internal cooling achieved during April 1998 #12;· The termitary model · The termitary is an i f

Behmer, Spencer T.

427

A Design for Unattended Monitoring of Carbon Dioxide on a Very Tall Tower  

Science Conference Proceedings (OSTI)

Unattended measurements of carbon dioxide (CO2) mixing ratio at three altitudes up to 496 m above the surface on a television transmitter tower in the southeastern United States have been made for a period of 4 yr. This report describes the ...

Cong Long Zhao; Peter S. Bakwin; Pieter P. Tans

1997-10-01T23:59:59.000Z

428

New Ozone Measurement Systems for Autonomous Operation on Ocean Buoys and Towers  

Science Conference Proceedings (OSTI)

Two autonomous ozone measurement systems for use on ocean buoys and towers have been built and are discussed herein. They are based on low-power atmospheric ozone sensors from Physical Sciences Inc. (PSI) and 2B Technologies. The PSI sensor ...

E. J. Hintsa; G. P. Allsup; C. F. Eck; D. S. Hosom; M. J. Purcell; A. A. Roberts; D. R. Scott; E. R. Sholkovitz; W. T. Rawlins; P. A. Mulhall; K. Lightner; W. W. McMillan; J. Song; M. J. Newchurch

2004-07-01T23:59:59.000Z

429

Conceptual Design of a 100 MWe Modular Molten Salt Power Tower Plant  

DOE Green Energy (OSTI)

A conceptual design of a 100 MWe modular molten salt solar power tower plant has been developed which can provide capacity factors in the range of 35 to 75%. Compared to single tower plants, the modular design provides a higher degree of flexibility in achieving the desired customer's capacity factor and is obtained simply by adjusting the number of standard modules. Each module consists of a standard size heliostat field and receiver system, hence reengineering and associated unacceptable performance uncertainties due to scaling are eliminated. The modular approach with multiple towers also improves plant availability. Heliostat field components, receivers and towers are shop assembled allowing for high quality and minimal field assembly. A centralized thermal-storage system stores hot salt from the receivers, allowing nearly continuous power production, independent of solar energy collection, and improved parity with the grid. A molten salt steam generator converts the stored thermal energy into steam, which powers a steam turbine generator to produce electricity. This paper describes the conceptual design of the plant, the advantages of modularity, expected performance, pathways to cost reductions, and environmental impact.

James E. Pacheco; Carter Moursund, Dale Rogers, David Wasyluk

2011-09-20T23:59:59.000Z

430

Application of a Cloud Model to Cooling Tower Plumes and Clouds  

Science Conference Proceedings (OSTI)

A steady-state, one-dimensional cloud model has been modified to simulate the growth of plumes (both wet and dry) and clouds from natural and forced draft cooling towers. The modifications to the cloud model are discussed and comparisons are made ...

Harold D. Orville; John H. Hirsch; Laurence E. May

1980-11-01T23:59:59.000Z

431

CFD MODELING AND ANALYSIS FOR A-AREA AND H-AREA COOLING TOWERS  

Science Conference Proceedings (OSTI)

Mechanical draft cooling towers are designed to cool process water via sensible and latent heat transfer to air. Heat and mass transfer take place simultaneously. Heat is transferred as sensible heat due to the temperature difference between liquid and gas phases, and as the latent heat of the water as it evaporates. Mass of water vapor is transferred due to the difference between the vapor pressure at the air-liquid interface and the partial pressure of water vapor in the bulk of the air. Equations to govern these phenomena are discussed here. The governing equations are solved by taking a computational fluid dynamics (CFD) approach. The purpose of the work is to develop a three-dimensional CFD model to evaluate the flow patterns inside the cooling tower cell driven by cooling fan and wind, considering the cooling fans to be on or off. Two types of the cooling towers are considered here. One is cross-flow type cooling tower located in A-Area, and the other is counterflow type cooling tower located in H-Area. The cooling tower located in A-Area is mechanical draft cooling tower (MDCT) consisting of four compartment cells as shown in Fig. 1. It is 13.7m wide, 36.8m long, and 9.4m high. Each cell has its own cooling fan and shroud without any flow communications between two adjacent cells. There are water distribution decks on both sides of the fan shroud. The deck floor has an array of about 25mm size holes through which water droplet falls into the cell region cooled by the ambient air driven by fan and wind, and it is eventually collected in basin area. As shown in Fig. 1, about 0.15-m thick drift eliminator allows ambient air to be humidified through the evaporative cooling process without entrainment of water droplets into the shroud exit. The H-Area cooling tower is about 7.3 m wide, 29.3 m long, and 9.0 m high. Each cell has its own cooling fan and shroud, but each of two corner cells has two panels to shield wind at the bottom of the cells. There is some degree of flow communications between adjacent cells through the 9-in gap at the bottom of the tower cells as shown in Fig. 2. Detailed geometrical dimensions for the H-Area tower configurations are presented in the figure. The model was benchmarked and verified against off-site and on-site test results. The verified model was applied to the investigation of cooling fan and wind effects on water cooling in cells when fans are off and on. This report will discuss the modeling and test results.

Lee, S.; Garrett, A.; Bollinger, J.

2009-09-02T23:59:59.000Z

432

Alternative Fuels Data Center: Installing New E85 Equipment  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Installing New E85 Installing New E85 Equipment to someone by E-mail Share Alternative Fuels Data Center: Installing New E85 Equipment on Facebook Tweet about Alternative Fuels Data Center: Installing New E85 Equipment on Twitter Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Google Bookmark Alternative Fuels Data Center: Installing New E85 Equipment on Delicious Rank Alternative Fuels Data Center: Installing New E85 Equipment on Digg Find More places to share Alternative Fuels Data Center: Installing New E85 Equipment on AddThis.com... More in this section... Ethanol Basics Benefits & Considerations Stations Locations Infrastructure Development Business Case Equipment Options Equipment Installation Codes, Standards, & Safety Vehicles Laws & Incentives

433

Injection Molding of Tungsten Powder Treated by Jet Mill  

Science Conference Proceedings (OSTI)

Tungsten powder was firstly treated by jet mill, resulting in the improvement of ... and Welding Conditions of Monopile and Transition for Offshore Wind Plant.

434

Nanoestructured Altisin Coatings For Ball Helical Milling Application ...  

Science Conference Proceedings (OSTI)

Abstract Scope, The current power wind generation industry uses for its power ... In this work the behavior and improvement of tool life for ball end mills with ...

435

Monticello Mill Tailings, Operable Unit III Surface and Ground...  

Office of Legacy Management (LM)

Action activities included millsite dewatering and treatment, initiation of a ground water management policy to prevent use Monticello Mill Tailings Site, Operable Unit III...

436

Development and Characterization of Milled Silver Powder Addition ...  

Science Conference Proceedings (OSTI)

In order to add the milled Ag powders to granular PP feedstock two different .... Membranes Obtained from PA6/HDPE Blends Via Precipitation by Immersion.

437

Influence of Milling Time on Microstructure and Thermoelectric ...  

Science Conference Proceedings (OSTI)

Presentation Title, Influence of Milling Time on Microstructure and Thermoelectric Properties of p-Type Bi2Te3 Alloys. Author(s), Madavali Babu, Hyo Seob Kim, ...

438

(ns) Al-2024 Alloy Obtained via Cryogenic Milling  

Science Conference Proceedings (OSTI)

Milling Al-2024 powder of big particle size (>100 microns) in cryogenic regime resulted in nanostructured powder of 46 nm grain size after 18h. Furthermore ...

439

A Computer Simulation of an Agitation Mill Abrasion Process for ...  

Science Conference Proceedings (OSTI)

We already confirmed that a special and selective grinding such as parts abrasion from the board using agitation mill was effective for the recycling of a part of ...

440

Potential for reducing paper mill energy use and carbon dioxide...  

NLE Websites -- All DOE Office Websites (Extended Search)

Li Journal Applied Energy Volume 102 Date Published 022013 Keywords co2 emissions, energy audit, paper mill Abstract The pulp and paper industry is one of the most...

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Effect of enzyme application in temper water on wheat milling.  

E-Print Network (OSTI)

??The effect of enzyme in temper water on wheat milling performance and flour quality was studied. Five independent variables, enzyme concentration, incubation time, incubation temperature,… (more)

Yoo, Juhyun

2007-01-01T23:59:59.000Z

442

DOE - Office of Legacy Management -- Falls City Mill Site - TX...  

NLE Websites -- All DOE Office Websites (Extended Search)

Materials Handled: Radiological Survey(s): Site Status: Also see Falls City, Texas, Disposal Site Documents Related to Falls City Mill Site Data Validation Package for...

443

DOE - Office of Legacy Management -- Lowman Mill Site - ID 01  

Office of Legacy Management (LM)

Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Lowman, Idaho, Disposal Site Documents Related to Lowman Mill Site Historical documents may contain...

444

A STUDY ON LEGIONELLA PNEUMOPHILA, WATER CHEMISTRY, AND ATMOSPHERIC CONDITIONS IN COOLING TOWERS AT THE SAVANNAH RIVER SITE  

SciTech Connect

Legionnaires disease is a pneumonia caused by the inhalation of the bacterium Legionella pneumophila. The majority of illnesses have been associated with cooling towers since these devices can harbor and disseminate the bacterium in the aerosolized mist generated by these systems. Historically, Savannah River Site (SRS) cooling towers have had occurrences of elevated levels of Legionella in all seasons of the year and in patterns that are difficult to predict. Since elevated Legionella in cooling tower water are a potential health concern a question has been raised as to the best control methodology. In this work we analyze available chemical, biological, and atmospheric data to determine the best method or key parameter for control. The SRS 4Q Industrial Hygiene Manual, 4Q-1203, 1 - G Cooling Tower Operation and the SRNL Legionella Sampling Program, states that 'Participation in the SRNL Legionella Sampling Program is MANDATORY for all operating cooling towers'. The resulting reports include L. pneumophila concentration information in cells/L. L. pneumophila concentrations >10{sup 7} cells/L are considered elevated and unsafe so action must be taken to reduce these densities. These remedial actions typically include increase biocide addition or 'shocking'. Sometimes additional actions are required if the problem persists including increase tower maintenance (e.g. cleaning). Evaluation of 14 SRS cooling towers, seven water quality parameters, and five Legionella serogroups over a three-plus year time frame demonstrated that cooling tower water Legionella densities varied widely though out this time period. In fact there was no one common consistent significant variable across all towers. The significant factors that did show up most frequently were related to suspended particulates, conductivity, pH, and dissolved oxygen, not chlorine or bromine as might be expected. Analyses of atmospheric data showed that there were more frequent significant elevated Legionella concentrations when the dew point temperature was high--a summertime occurrence. However, analysis of the three years of Legionella monitoring data of the 14 different SRS Cooling Towers demonstrated that elevated concentrations are observed at all temperatures and seasons. The objective of this study is to evaluate the ecology of L. pneumophila including serogroups and population densities, chemical, and atmospheric data, on cooling towers at SRS to determine whether relationships exist among water chemistry, and atmospheric conditions. The goal is to more fully understand the conditions which inhibit or encourage L. pneumophila growth and supply this data and associated recommendations to SRS Cooling Tower personnel for improved management of operation. Hopefully this information could then be used to help control L. pneumophila growth more effectively in SRS cooling tower water.

Smith, C.; Brigmon, R.

2009-10-20T23:59:59.000Z

445

Jim Walter Resources installs new overland conveyor  

Science Conference Proceedings (OSTI)

Embarking on a major expansion plan, the company is constructing a new additional overland conveyor coal to a recently refurbished prep plant. Jim Walter Resources recently invested $20 million in a new 5-mile overland conveyor system to haul coal from the No.7 deep coal mine in Alabama to the No.5 coal preparation plant. The size of the No.7 mine was effectively doubled. The article describes how this expansion move was decided upon and describes the design and installation of the new conveyor which spans approximately 5 miles. 4 photos.

Fiscor, S.

2008-12-15T23:59:59.000Z

446

Installation package for concentrating solar collector panels  

DOE Green Energy (OSTI)

Northrup, Inc., has developed and delivered 300 square feet of Concentrating Solar Collector (ML Series) and Attitude Control System, under the direction of the National Aeronautics and Space Administration. The ''ML Series'' Solar Collector Panels comprise a complete package array consisting of collector panels using modified Fresnel Prismatic Lenses for a 10 to 1 concentrating ration, supporting framework, fluid manifolding and tracking drive system, in unassembled components for field erection. The Installation, Operation and Maintenance Manual, Warranty, List of Materials, Sub-Assembly drawings and Final Field Assembly Drawings are included in the package.

Not Available

1978-08-01T23:59:59.000Z

447

Engineering assessment of inactive uranium mill tailings  

SciTech Connect

The Grand Junction site has been reevaluated in order to revise the October 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Grand Junction, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.9 million tons of tailings at the Grand Junction site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The eight alternative actions presented herein range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through VIII). Cost estimates for the eight options range from about $10,200,000 for stabilization in-place to about $39,500,000 for disposal in the DeBeque area, at a distance of about 35 mi, using transportation by rail. If transportation to DeBeque were by truck, the cost estimated to be about $41,900,000. Three principal alternatives for the reprocessing of the Grand Junction tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $200/lb by heap leach and $150/lb by conventional plant processes. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery appears not to be economically attractive.

Not Available

1981-07-01T23:59:59.000Z

448

Applications of Yang-Mills thermodynamics  

Science Conference Proceedings (OSTI)

We discuss the postulate that the U(1) gauge group describing photon propagation results from a dynamically broken SU(2) gauge theory. In the context of Yang-Mills thermodynamics such a symmetry breaking occurs via the non-trivial ground state. As a result of the interaction with the quasi particles of the theory the photon acquires an effective, temperature and momentum dependent, mass. We explain how this leads to modified black body spectra at temperatures of about 5 K. Furthermore, we discuss the properties and effects of an emergent longitudinal polarization.

Schwarz, Markus [Salierstr. 10.,76137 Karlsruhe (Germany)

2012-09-26T23:59:59.000Z

449

Fundamental and effective Yang-Mills vertices  

SciTech Connect

Calorons and plane waves within and in between them collectively give rise to a thermal ground state. The latter provides a homgeneous energy density and a negative pressure, and it induces quasiparticle masses to part of the propagating spectrum of deconfining SU(2) Yang-Mills thermodynamics (dynamical gauge-symmetry breaking). In the present talk we discuss the role of a single caloron in inducing effective local vertices, characterized by powers of h, mediating the interaction of plane waves which propagate over large distances. The constraints on momentum transfers through effective 4-vertices are revisited.

Hofmann, Ralf [ITP, Universitaet Heidelberg, Philosophenweg 16, 69120 Heidelberg (Germany)

2012-09-26T23:59:59.000Z

450

Chapter 2: uranium mines and mills  

SciTech Connect

This chapter will be included in a larger ASCE Committee Report. Uranium mining production is split between underground and open pit mines. Mills are sized to produce yellowcake concentrate from hundreds to thousands of tons of ore per day. Miner's health and safety, and environmental protection are key concerns in design. Standards are set by the US Mine Safety and Health Administration, the EPA, NRC, DOT, the states, and national standards organizations. International guidance and standards are extensive and based on mining experience in many nations.

O'Connell, W.J.

1983-03-01T23:59:59.000Z

451

Pocket Milling with Tool Engagement Detection  

E-Print Network (OSTI)

This paper presents an algorithm for generating a tool path for cutting a pocket with islands, which includes detecting when the tool is certain to be making a minimal engagement cut. Minimal engagement is defined as the amount of engagement present in peripheral milling of a flat side face of a workpiece in a straight line with constant stepover. Feed rates and spindle speeds are reset by the algorithm when machining conditions change from a minimal engagement cut to any other type of cut or vice versa.

Thomas Kramer April; Thomas R. Kramer

1992-01-01T23:59:59.000Z

452

Assembling and Installing LRUs for NIF  

SciTech Connect

Within the 192 National Ignition Facility (NIF) beamlines, there are over 7000 large (40 x 40 cm) optical components, including laser glass, mirrors, lenses, and polarizers. These optics are held in large opto-mechanical assemblies called line-replaceable units (LRUs). Each LRU has strict specifications with respect to cleanliness, alignment, and wavefront so that once activated, each NIF beamline will meet its performance requirements. NIF LRUs are assembled, tested, and refurbished in on-site cleanroom facilities. The assembled LRUs weigh up to 1800 kilograms, and are about the size of a phone booth. They are transported in portable clean canisters and inserted into the NIF beampath using robotic transporters. This plug and play design allows LRUs to be easily removed from the beampath for maintenance or upgrades. Commissioning of the first NIF quad, an activity known as NIF Early Light (NEL), has validated LRU designs and architecture, as well as demonstrated that LRUs can be assembled and installed as designed. Furthermore, it has served to develop key processes and tools forming the foundation for NIF s long-term LRU production and maintenance strategy. As we look forward to building out the rest of NIF, the challenge lies in scaling up the production rate while maintaining quality, implementing process improvements, and fully leveraging the learning and experience gained from NEL. This paper provides an overview of the facilities, equipment and processes used to assemble and install LRUs in NIF.

Bonanno, R E

2003-12-31T23:59:59.000Z

453

Performance of Installed Cooking Exhaust Devices  

Science Conference Proceedings (OSTI)

The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) – including exhaust fan/microwave combination appliances – were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

2011-11-01T23:59:59.000Z

454

Collimateur integration and installation Example of one object to be installed in the LHC  

E-Print Network (OSTI)

The collimation system is a vital part of the LHC project, protecting the accelerator against unavoidable regular and irregular beam loss. About 80 collimators will be installed in the machine before the first run. Two insertion regions are dedicated to collimation and these regions will be among the most radioactive in the LHC. The space available in the collimation regions is very restricted, it was therefore important to ensure that the 3-D integration of these areas of the LHC tunnel would allow straightforward installation of collimators and also exchange of collimators under the remote handling constraints imposed by high radiation levels. The paper describes the 3-D integration studies and verifications of the collimation regions combining the restricted space available, the dimensions of the different types of collimators and the space needed for transport and handling. The paper explains how installation has been planned and carried out taking into account the handling.

Aberle, O; Chamizo, R; Weiler, T; Chemli, S; Corso, J P; Coupard, J; Delsaux, F; Foraz, K; Jiménez, J M; Kadi, Y; Kershaw, K; Lazzaroni, M; Perret, R; Bertone, C; Grenard, J L

2008-01-01T23:59:59.000Z

455

Geometric Approaches for Reducing Burr Formation in Planar Milling by Avoiding Tool Exits  

E-Print Network (OSTI)

1999). “A summary of micro-milling studies. ” 1st Int’lT.R. (1992). “Pocket milling with tool engagement detec-Burr minimization in face milling: a geometric approach. ”

Chu, Chih-Hsing; Dornfeld, David

2008-01-01T23:59:59.000Z

456

The Milling Stone Horizon Revisited: New Perspectives from Northern and Central California  

E-Print Network (OSTI)

Berryessa II. Journal THE MILLING STONE HORIZON REVISITEDI, pp. 67-93 (1999). The Milling Stone Horizon Revisited:nearly half a century, the Milling Stone Horizon has been

Fitzgerald, Richard T.; Jones, Terry L.

1999-01-01T23:59:59.000Z

457

Back Cutting and Tool Wear Influence on Burrs in Face Milling - Analysis and Solutions  

E-Print Network (OSTI)

of uncoated and coated milling inserts”, Wear, 225/229, ppBurr Minimization in Face Milling: A Geometric Approach,System for Burr i n Face Milling”, Journal of Manufacturing

Rangarajan, Arvind; Dornfeld, David A

2004-01-01T23:59:59.000Z

458

A Study of Surface Roughness in the Micro-End-Milling Process  

E-Print Network (OSTI)

adaptive control of end milling operations,” Proc. NAMRC-iv,generation in dynamic milling,” ASME J. Eng. Ind. , 113,produced with the micro- end-milling process. Alauddin, M. ,

Lee, Kiha; Dornfeld, David A

2004-01-01T23:59:59.000Z

459

On The Face Milling Burr Formation Mechanisms and Minimization Strategies at High Tool Engagement  

E-Print Network (OSTI)

on Burr Formation in Face Milling with an Extreme PositiveBurr Formation in Face Milling”, Bulletin Japan Society ofRoughness in High Speed Face Milling”, 2001-2002 LMA Annual

Avila, Miguel C; Dornfeld, David A

2004-01-01T23:59:59.000Z

460

The Possibilities of Women and Men: Gender and the California Milling Stone Horizon  

E-Print Network (OSTI)

Richard 1991 Archaic Milling Cultures of the Southern SanGender and the California Milling Stone Horizon KELLY R.those subsumed under the Milling Stone Horizon, that are not

McGuire, Kelly R; Hildebrandt, William R

1994-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Impact evaluation of energy conservation measures installed at Mayr Brothers Logging Company under the Energy Savings Plan  

SciTech Connect

This impact evaluation of adjustable speed drives (ASDs), programmble logic controllers (PLCs), and high efficiency motors (HEMs) that were recently installed at Mayr Brothers Logging Co., Inc. (Mayr Bros.) was conducted for the Bonneville Power Administration (Bonneville) as part of an evaluation of its Energy $avings Plan (E$P) Program. The project consists of ASDs, PLCs, and HEMs that were installed at the Mayr Bros. new small log nill at their facility in Hoquiam, Washington. Energy savings directly accrue through improved motor efficiency and indirectly accrue via an increase in production rate. This latter effect reduces energy consumption per unit of production by spreading fixed energy requirements over a greater number of units. The objective of this impact evaluation was to assess how much electricity is being saved at Mayr Bros. as a result of the E$P and to determine how much the savings cost Bonneville and the region. The impact of the project was evaluated with a combination of engineering analysis, financial analysis, interviews, and submittal reviews (Mayr Bros. proposal and completion report). The energy conservation measures were incorporated into the small log mill while the mill was constructed in 1992 and 1993. Financing the new mill had stretched Mayr Bros. cash and credit resources to the limit. Without the acquisition payment, Mayr Bros. would not have been able to afford the additional investment in the energy conservation measures. Therefore, all of the project`s impact can be attributed to the E$P. The key recommendation resulting from this impact evaluation is to avoid the direct comparison of energy consumption estimates derived via engineering calculations and metering. If ``before and after`` metering is not possible, engineering calculations should be calibrated against metered data to enhance comparability.

Brown, D.R.; Spanner, G.E.

1995-05-01T23:59:59.000Z

462

Choosing and Installing Geothermal Heat Pumps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps June 24, 2012 - 3:55pm Addthis These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos What does this mean for me? Installing a geothermal heat pump is not a do-it-yourself job. When you hire a contractor to install your geothermal heat pump, ask for and check references of installations that are several years old.

463

Design and installation package for a solar powered pump  

DOE Green Energy (OSTI)

Information is presented to evaluate the design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company. Included is information about subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings.

Not Available

1978-07-01T23:59:59.000Z

464

Tracking the Sun III The Installed Cost of Photovoltaics  

E-Print Network (OSTI)

Contents The Installed Cost of Photovoltaics in the U.S. from 1998-2009 Environmental Energy Technologies .................................................................... 10 4. PV Incentive and Net Installed Cost Trends ....................................... 27 5 Appendix A: Data Cleaning, Coding, and Standardization ....................... 36 Appendix B: Detailed

465

Issue #3: HVAC Proper Installation Energy Savings: Over-Promising...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering? Issue 3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering? What energy...

466

Energy Saving 'Cool Roofs' Installed at Y-12 | National Nuclear...  

National Nuclear Security Administration (NNSA)

Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Energy Saving 'Cool Roofs' Installed at Y-12 Energy Saving 'Cool Roofs' Installed at Y-12...

467

Energy Department Launches SunShot Prize Competition to Install...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunShot Prize Competition to Install Solar Energy Systems at a Fraction of Today's Price Energy Department Launches SunShot Prize Competition to Install Solar Energy Systems at a...

468

Choosing and Installing Geothermal Heat Pumps | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps Choosing and Installing Geothermal Heat Pumps June 24, 2012 - 3:55pm Addthis These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos These geothermal heating and cooling units installed in the basement of a new home are tied to a complex array of underground coils to keep indoor temperatures comfortable. | Photo courtesy of ©iStockphoto/BanksPhotos What does this mean for me? Installing a geothermal heat pump is not a do-it-yourself job. When you hire a contractor to install your geothermal heat pump, ask for and check references of installations that are several years old.

469

Observations from the field: Solar domestic hot water installation recommendations  

SciTech Connect

The Florida Solar Energy Center (FSEC) was ten years old in 1984. Constant contact has been maintained between the Center and solar businesses selling and installing domestic hot water systems in Florida and throughout the Southern states of the Caribbean. FSEC has thus had the opportunity to visit or discuss thousands of DHW system installations with homeowners and installers. This paper provides an overview of lessons learned and some of the resulting installation recommendations for direct, open-loop domestic hot water systems.

Cromer, C.J.

1985-01-01T23:59:59.000Z

470

NREL Job Task Analysis: Retrofit Installer Technician (Revised)  

SciTech Connect

A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence.

Kurnik, C.; Woodley, C.

2012-04-01T23:59:59.000Z

471

Uranium Mill Tailings Remedial Action Project surface project management plan  

SciTech Connect

This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

Not Available

1994-09-01T23:59:59.000Z

472

Energy Conservation in the Food Industry : Terminal Flour Mill.  

SciTech Connect

This report presents the results of an energy study that was conducted at Terminal Flour Mill in Portland, Oregon. Terminal Flour Mill is one of five food industry (SIC 20) plants that are being studied. Energy conservation measures (ECM's) are divided into two groups; operation and maintenance (O and M) measures, and equipment modification measures.

United Industries Corporation.

1985-03-01T23:59:59.000Z

473

UDS Recovery Equipment Installation (AFCI CETE Milestone Report)  

SciTech Connect

This letter documents the successful installation of the un-dissolved solids (UDS) recovery equipment into the hot-cell in building 7920 at ORNL. This installation (see Figure 1) satisfies the AFCI Level 4 milestone in the CETE Investments and Hot Cell Upgrades work package (OR0915020323) to 'Complete UDS recovery equipment installation' (M4502032306), due 30 June 09.

Jubin, Robert Thomas [ORNL

2009-06-01T23:59:59.000Z

474

EA-1155: Ground-water Compliance Activities at the Uranium Mill...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Ground-water Compliance Activities at the Uranium Mill Tailings Site, Spook, Wyoming EA-1155: Ground-water Compliance Activities at the Uranium Mill Tailings Site, Spook,...

475

The Vertical Ball Mill for the Grinding of Calcined Petroleum Coke to ...  

Science Conference Proceedings (OSTI)

A new vertical ball ring mill concept has been developed based on the results of research on the grinding of calcined petroleum coke. Industrial vertical mills are ...

476

Removal of Thiosalts using Biomass Ash from Pulp and Paper Mill ...  

Science Conference Proceedings (OSTI)

Biomass ash used in this study is collected from Corner Brook Pulp and Paper Mill, NL and Zellstoff Celgar Mill, BC and is characterized to understand the ...

477

Synthesis of Sm-Fe-N Hard Magnets by Reactive Mechanical Milling  

Science Conference Proceedings (OSTI)

In this study, we have performed reactive mechanical milling on Sm2Fe17 alloy under hydrogen atmosphere. After reactive mechanical milling, the Sm2Fe17 ...

478

Microsoft Word - CX-PortTownsendPaperCompany-MillSubControlHouse_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2010 8, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Chad N. Caldwell Electrical Engineer - TPC-OLYMPIA Proposed Action: Install new relays in Port Townsend Paper Company's new Mill Substation control house and remove relays from Port Townsend Paper Company's turbine room. PP&A Project No: 1759 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose... replace outmoded components. Location: Port Townsend, Washington

479

CNTA_Well_Installation_Report.book  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Security Administration Nuclear Security Administration Nevada Site Office Environmental Restoration Division Nevada Environmental Restoration Project Well Installation Report for Corrective Action Unit 443, Central Nevada Test Area Nye County, Nevada Revision No.: 0 January 2006 Approved for public release; further dissemination unlimited. DOE/NV--1102 Uncontrolled When Printed Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm Available electronically at http://www.osti.gov/bridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from:

480

Nuclear Plant Analyzer: Installation manual. Volume 1  

SciTech Connect

This report contains the installation instructions for the Nuclear Plant Analyzer (NPA) System. The NPA System consists of the Computer Visual System (CVS) program, the NPA libraries, the associated utility programs. The NPA was developed at the Idaho National Engineering Laboratory under the sponsorship of the US Nuclear Regulatory Commission to provide a highly flexible graphical user interface for displaying the results of these analysis codes. The NPA also provides the user with a convenient means of interactively controlling the host program through user-defined pop-up menus. The NPA was designed to serve primarily as an analysis tool. After a brief introduction to the Computer Visual System and the NPA, an analyst can quickly create a simple picture or set of pictures to aide in the study of a particular phenomenon. These pictures can range from simple collections of square boxes and straight lines to complex representations of emergency response information displays.

Snider, D.M.; Wagner, K.L.; Grush, W.H.; Jones, K.R. [Idaho National Engineering Lab., Idaho Falls, ID (United States)]|[Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "tower installation mille" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

EIS-0198: Uranium Mill Tailings Remedial Action Groundwater Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

198: Uranium Mill Tailings Remedial Action Groundwater Project 198: Uranium Mill Tailings Remedial Action Groundwater Project EIS-0198: Uranium Mill Tailings Remedial Action Groundwater Project SUMMARY This EIS assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 28, 1997 EIS-0198: Record of Decision Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project (April 1997) December 1, 1996 EIS-0198: Programmatic Environmental Impact Statement Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project

482

Moab Mill Tailings Removal Project Celebrates 5 Years of Success |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mill Tailings Removal Project Celebrates 5 Years of Success Mill Tailings Removal Project Celebrates 5 Years of Success Moab Mill Tailings Removal Project Celebrates 5 Years of Success October 3, 2012 - 12:00pm Addthis Pictured here is the Moab uranium mill tailings pile. Tailings excavation and conditioning activities are seen in the foreground. The water spray is used to eliminate extracted contaminated groundwater. Pictured here is the Moab uranium mill tailings pile. Tailings excavation and conditioning activities are seen in the foreground. The water spray is used to eliminate extracted contaminated groundwater. Moab Federal Project Director Donald Metzler stands on a final cover layer of the disposal cell. Several other layers are visible behind him. Moab Federal Project Director Donald Metzler stands on a final cover layer

483

Moab Mill Tailings Removal Project Celebrates 5 Years of Success |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moab Mill Tailings Removal Project Celebrates 5 Years of Success Moab Mill Tailings Removal Project Celebrates 5 Years of Success Moab Mill Tailings Removal Project Celebrates 5 Years of Success October 3, 2012 - 12:00pm Addthis Pictured here is the Moab uranium mill tailings pile. Tailings excavation and conditioning activities are seen in the foreground. The water spray is used to eliminate extracted contaminated groundwater. Pictured here is the Moab uranium mill tailings pile. Tailings excavation and conditioning activities are seen in the foreground. The water spray is used to eliminate extracted contaminated groundwater. Moab Federal Project Director Donald Metzler stands on a final cover layer of the disposal cell. Several other layers are visible behind him. Moab Federal Project Director Donald Metzler stands on a final cover layer

484

DOE - Office of Legacy Management -- Uravan Mill Site - CO 02  

Office of Legacy Management (LM)

Uravan Mill Site - CO 02 Uravan Mill Site - CO 02 FUSRAP Considered Sites Site: Uravan Mill Site (CO.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Naturita, Colorado, Processing Site Documents Related to Uravan Mill Site Data Validation Package for the July and October 2008 Water Sampling at the Naturita Processing and Disposal Sites Data Validation Report for the July 2009 Groundwater and Surface Water Sampling at the Naturita, Colorado, Processing Site; LMS/NAP/S00709; October 2009 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Naturita, Colorado,

485

Using remote installation services for windows to streamline installations in the UTPB computer science research lab  

Science Conference Proceedings (OSTI)

The Computer Science Research Lab at The University of Texas of the Permian Basin (UTPB) is operated by three part-time student assistants with minimal faculty supervision. This lab supports seven Windows and Sun Solaris servers and approximately thirty ... Keywords: RIS, remote installation, windows

Cherry Owen; Dustin Piper

2006-11-01T23:59:59.000Z

486

Feasibility study for low-head hydropower on the Mill River, Northampton, Massachusetts  

DOE Green Energy (OSTI)

Five existing dams along a 6.5-mile reach of the Mill River in the City of Northampton, Massachusetts were studied to assess the feasibility of developing the sites for low-head hydroelectric power generation. Each of the dams was inspected to evaluate existing conditions and necessary work required to rehabilitate the structures. Analyses of hydrology and power potential were carried out and a packaged tube turbine-generator unit was found to be suitable for installation at all sites. Project layouts were developed making maximum use of existing structures and natural and man-made features. Capital and operation and maintenance costs were estimated based on the project layouts and the selected turbine-generator units. Financial analyses were performed using a set of baseline assumptions. Sensitivity tests of alternative assumptions were also prepared, along with analyses of assistance program alternatives. Finally, the legal, environmental, and socio-institutional considerations affecting development of the hydro projects were identified and reviewed. Hydro developments on the Mill River were found to be technically feasible, presenting no extraordinary engineering, environmental, or legal problems. However, none of these projects, either individually or jointly, would be financially feasible without substantial assistance in the form of capital grants.

None

1979-01-01T23:59:59.000Z

487

Installing R and R-Commander This appendix gives detailed instructions for installing R and R-Commander.  

E-Print Network (OSTI)

"Subdirectories", and install "tcltk.dmg" (universal build of Tcl/Tk for X11). This file includes additional tools

Utts, Jessica

488

Design considerations for concentrating solar power tower systems employing molten salt.  

DOE Green Energy (OSTI)

The Solar Two Project was a United States Department of Energy sponsored project operated from 1996 to 1999 to demonstrate the coupling of a solar power tower with a molten nitrate salt as a heat transfer media and for thermal storage. Over all, the Solar Two Project was very successful; however many operational challenges were encountered. In this work, the major problems encountered in operation of the Solar Two facility were evaluated and alternative technologies identified for use in a future solar power tower operating with a steam Rankine power cycle. Many of the major problems encountered can be addressed with new technologies that were not available a decade ago. These new technologies include better thermal insulation, analytical equipment, pumps and values specifically designed for molten nitrate salts, and gaskets resistant to thermal cycling and advanced equipment designs.

Moore, Robert Charles; Siegel, Nathan Phillip; Kolb, Gregory J.; Vernon, Milton E.; Ho, Clifford Kuofei

2010-09-01T23:59:59.000Z

489

Current and Future Costs for Parabolic Trough and Power Tower Systems in the US Market: Preprint  

DOE Green Energy (OSTI)

NREL's Solar Advisor Model (SAM) is employed to estimate the current and future costs for parabolic trough and molten salt power towers in the US market. Future troughs are assumed to achieve higher field temperatures via the successful deployment of low melting-point, molten-salt heat transfer fluids by 2015-2020. Similarly, it is assumed that molten salt power towers are successfully deployed at 100MW scale over the same time period, increasing to 200MW by 2025. The levelized cost of electricity for both technologies is predicted to drop below 11 cents/kWh (assuming a 10% investment tax credit and other financial inputs outlined in the paper), making the technologies competitive in the marketplace as benchmarked by the California MPR. Both technologies can be deployed with large amounts of thermal energy storage, yielding capacity factors as high as 65% while maintaining an optimum LCOE.

Turchi, C.; Mehos, M.; Ho, C. K.; Kolb, G. J.

2010-10-01T23:59:59.000Z

490

Current and future costs for parabolic trough and power tower systems in the US market.  

SciTech Connect

NREL's Solar Advisor Model (SAM) is employed to estimate the current and future costs for parabolic trough and molten salt power towers in the US market. Future troughs are assumed to achieve higher field temperatures via the successful deployment of low melting-point, molten-salt heat transfer fluids by 2015-2020. Similarly, it is assumed that molten salt power towers are successfully deployed at 100MW scale over the same time period, increasing to 200MW by 2025. The levelized cost of electricity for both technologies is predicted to drop below 11 cents/kWh (assuming a 10% investment tax credit and other financial inputs outlined in the paper), making the technologies competitive in the marketplace as benchmarked by the California MPR. Both technologies can be deployed with large amounts of thermal energy storage, yielding capacity factors as high as 65% while maintaining an optimum LCOE.

Turchi, Craig (National Renewable Energy Laboratory, Golden, CO); Kolb, Gregory J.; Mehos, Mark Steven (National Renewable Energy Laboratory, Golden, CO); Ho, Clifford Kuofei

2010-08-01T23:59:59.000Z

491

Proposal for the award of a contract for the upgrade of the SPS cooling towers  

E-Print Network (OSTI)

This document concerns the award of a contract for the upgrade of the SPS cooling towers. Following a market survey carried out among 56 firms in sixteen Member States, a call for tenders (IT-2740/ST/SPS) was sent on 14 February 2000 to 10 firms in six Member States. By the closing date, CERN had received seven tenders from seven firms. The Finance Committee is invited to agree to the negotiation of a contract with SPIG (IT), the lowest bidder, for the upgrade of the SPS cooling towers, for an amount of 1 073 757 Swiss francs, not subject to revision. SPIG has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT-73%; FI-24%; DE-3%.

2000-01-01T23:59:59.000Z

492

Proposal for the award of a contract for the construction of cooling-tower structures  

E-Print Network (OSTI)

This document concerns the award of a contract for the construction of reinforced-concrete cooling-tower structures at LHC Point 1. Following a market survey carried out among 79 firms in 17 Member States, a call for tenders (IT-2710/ST/LHC) was sent on 13 August 1999 to eight firms and two consortia, both consisting of three firms, in eight Member States. By the closing date, CERN had received four tenders. The Finance Committee is invited to agree to the negotiation of a contract for the construction of reinforced-concrete cooling towers at LHC Point 1 with the consortium PAT (AT), BARESEL (DE) and ZSCHOKKE LOCHER (CH), the lowest bidder complying with the specification, for an amount of 3 393 493 Swiss francs, not subject to revision. The consortium has indicated the following distribution by country of the supply covered by this adjudication proposal: BE-60%, AT-18%, CH-11% and DE-11%.

1999-01-01T23:59:59.000Z

493

LOOP CALCULUS AND BELIEF PROPAGATION FOR Q-ARY ALPHABET: LOOP TOWER  

Science Conference Proceedings (OSTI)

Loop calculus introduced in [1], [2] constitutes a new theoretical tool that explicitly expresses symbol Maximum-A-Posteriori (MAP) solution of a general statistical inference problem via a solution of the Belief Propagation (BP) equations. This finding brought a new significance to the BP concept, which in the past was thought of as just a loop-free approximation. In this paper they continue a discussion of the Loop Calculus, partitioning the results into three Sections. In Section 1 they introduce a new formulation of the Loop Calculus in terms of a set of transformations (gauges) that keeping the partition function of the problem invariant. The full expression contains two terms referred to as the 'ground state' and 'excited states' contributions. The BP equations are interpreted as a special (BP) gauge fixing condition that emerges as a special orthogonality constraint between the ground state and excited states, which also selects loop contributions as the only surviving ones among the excited states. In Section 2 they demonstrate how the invariant interpretation of the Loop Calculus, introduced in Section 1, allows a natural extension to the case of a general q-ary alphabet, this is achieved via a loop tower sequential construction. The ground level in the tower is exactly equivalent to assigning one color (out of q available) to the 'ground state' and considering all 'excited' states colored in the remaining (q-1) colors, according to the loop calculus rule. Sequentially, the second level in the tower corresponds to selecting a loop from the previous step, colored in (q-1) colors, and repeating the same ground vs excited states splitting procedure into one and (q-2) colors respectively. The construction proceeds till the full (q-1)-levels deep loop tower (and the corresponding contributions to the partition function) are established. In Section 3 they discuss an ultimate relation between the loop calculus and the Bethe-Free energy variational approach of [3].

CHERTKOV, MICHAEL [Los Alamos National Laboratory; CHERNYAK, VLADIMIR [Los Alamos National Laboratory

2007-01-10T23:59:59.000Z

494

Establishing Tower-Top Equipotential Zones--Case-Study of Incidents  

Science Conference Proceedings (OSTI)

The Occupational Safety and Health Administration (OSHA) requires employers to provide protection and training for workers who perform work on de-energized and energized lines. This Technical Update report contains the draft script of a new training video on DVD under development on establishing tower-top equipotential zones. The script contains case studies and analysis of specific selected incidents that have occurred in the field. It also includes recommendations for minimizing risks and avoiding elec...

2008-11-30T23:59:59.000Z

495

Evaluation of cooling tower and wastewater treatment operations at the Great Plains Coal Gasification Plant  

Science Conference Proceedings (OSTI)

The objective of this study was to provide a technical assessment of the Great Plains Coal Gasification Plant Wastewater Treatment System. This Scope of Work consisted of five primary tasks described as follows: Task 1 - Determine the quantity of hydantoins in the stripped gas liquor (SGL), their precursors, and the kinetics of their formation in condensed liquor for the Great Plains Gasification Associates (GPGA) gasification facility. The University of North Dakota Energy Research Center (UNDERC) has measured a high concentration of hydantoins in the gas liquor from their slagging gasifier. UNDERC has tested the use of SGL in a pilot cooling tower and they witnessed some adverse effects in the cooling tower and heat exchanger systems. Task 2 - Investigate the adverse Department of Energy (DOE) findings at UNDERC with regard to corrosion, foaming, biological and organic fouling, chemical attack on concrete and organic emissions resulting from the use of SGL in a pilot plant cooling tower. Task 3 - Validate the heat load on the cooling tower for both summer and winter operation and determine the adequacy of the surge pond to store the maximum predicted amount of excess water accumulated during winter operation. Task 4 - Assess potential fouling, foaming and organic carry-over problems associated with operability of the multiple-effect evaporator and develop recommendations on possible alternate use of evaporator condensate to alleviate possible problems in disposing of excess wastewater. Task 5 - Provide DOE with recommendations on the wastewater treatment backup design and test program already committed to by GPGA. This paper presents Fluor's findings regarding the five primary tasks. 12 refs., 4 figs., 15 tabs.

Lang, R.A.

1984-12-01T23:59:59.000Z

496

Some Views On “Hot Towers” after 50 Years of Tropical Field Programs and Two Years of TRMM Data  

Science Conference Proceedings (OSTI)

The “hot tower” hypothesis requires the existence of deep cumulonimbus clouds in the deep Tropics as essential agents, which accomplish the mass and energy transport essential for the maintenance of the general circulation. As the role of the ...

Edward J. Zipser

2003-01-01T23:59:59.000Z

497

Annual Forcing of the Surface Radiation Balance Diurnal Cycle Measured from a High Tower near Boulder, Colorado  

Science Conference Proceedings (OSTI)

The radiation balance consisting of upward and downward components of solar and thermal infrared broadband irradiances is continuously measured from the top of a 300-m tower situated on the Colorado high plains. The data are representative of a ...

Ellsworth G. Dutton

1990-12-01T23:59:59.000Z

498

Effects of adding wash tower effluent to Ano Liossia landfill to enhance bioreaction c by Olympia Galenianou.  

E-Print Network (OSTI)

A theoretical study was performed on the effects of adding sulfate-rich wash tower effluent from the Athens hospital waste incinerator to the Ano Liossia landfill of Athens. The method of mass balance was used to examine ...

Galenianou, Olympia

2006-01-01T23:59:59.000Z

499

Hybrid power towers: A solar boost for natural gas in the Southwest  

SciTech Connect

A new concept to combine central receiver technology with highly efficient natural gas turbines has sparked interest among key utilities in the southwestern United States. The result is a fully dispatchable hybrid power tower that`s expected to use 30% less natural gas than its conventional counterpart. Developed by researcher at the US DOE`s National Renewable Energy Laboratory (NREL), the hybrid power tower is the focus of a developing partnership with the Sacramento Municipal Utility District (SMUD) in California. Although some solar advocates criticize the use of nonrenewable natural gas, the hybrid concept mitigates many of the current barriers to commercializing solar thermal technology. NREL`s innovative concept uses a small central receiver plant to preheat combustion air for natural gas turbines. Solar thermal energy displaces the use of nonrenewable fossil fuel throughout much of the day. When solar heat is no longer available, the natural gas turbines ensure continuous operation to meet a utility`s need for baseload, intermediate, or peaking power, as desired. The combined-cycle power tower has many attractive features, but the bottom line is it can be commercialized in today`s utility market.

Brown, L.R. [National Renewable Energy Lab., Golden, CO (United States)

1995-08-01T23:59:59.000Z

500

The Worlds First Ever Cooling Tower Acceptance Test Using Process Data Reconciliation  

Science Conference Proceedings (OSTI)

The cooling capacity of cooling towers is influenced by multiple constructive and atmospheric parameters in a very complex way. This leads to strong variations of the measured cold-water temperature and causes unacceptable unreliability of conventional acceptance tests, which are based on single point measurements. In order to overcome this lack of accuracy a new approach to acceptance test based on process data reconciliation has been developed by BTB Jansky and applied at a nuclear power plant. This approach uses process data reconciliation according to VDI 2048 to evaluate datasets over a long period covering different operating conditions of the cooling tower. Data reconciliation is a statistical method to determine the true process parameters with a statistical probability of 95% by considering closed material-, mass-and energy balances. Datasets which are not suitable for the evaluation due to strong transient gradients are excluded beforehand, according to well-defined criteria. The reconciled cold-water temperature is then compared, within a wet bulb temperature range of 5 deg. C to 20 deg. C to the manufacturer's guaranteed temperature. Finally, if the average deviation between reconciled and guaranteed value over the evaluated period is below zero, the cooling tower guarantee is fulfilled. (authors)

Magnus Langenstein; Jan Hansen-Schmidt [BTB-Jansky GmbH, Gerlingerstrasse 151, D-71229 Leonberg (Germany)

2006-07-01T23:59:59.000Z